it plants bottling works of mineral natural...

8
IT PLANTS BOTTLING WORKS OF MINERAL NATURAL WATER Location: District: Colonia Las Rosas, City: Tunuyán, Province: Mendoza, Country: Argentina. General description: Plant I Shape recently inaugurated. Industrial ship of 700 m2. Surface of area of 2 hectares. Technology of modern equipment of last and advanced generation. Ideal spaces of labor tasks, it possesses laboratory, room of entry of bottles, wash, filling, packing and offices of administration. Systematized of productive line in 4.800 bottles of 2 liters per hour (daily total 230.400 lts.) and 1.000 cans of 6 liters per hour (daily total 144.000 lts.) From the own spring wherefrom the water extracts the whole circuit to itself, as absolutely all the facilities they are in stainless steel. The whole line of division, put in march and subsistence was and it is carried out by engineers specialized in the industrial development of mineral water. At the recent act of opening of the plant governmental authorities were present for be considering to be the second industrial plant of major importance for the whole Uco's Valley. Mayor Martín Aveiro (Right)

Upload: others

Post on 20-Mar-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: IT PLANTS BOTTLING WORKS OF MINERAL NATURAL WATERdeals.chinagoabroad.com/Uploads/2016-02/56b169330df51.pdf · Model plants of By installments and Packaging of Mineral Water This plant

IT PLANTS BOTTLING WORKS OF MINERAL NATURAL WATER

Location: District: Colonia Las Rosas, City: Tunuyán, Province: Mendoza, Country: Argentina. General description:

Plant I Shape recently inaugurated. Industrial ship of 700 m2.

Surface of area of 2 hectares.

Technology of modern equipment of last and advanced generation.

Ideal spaces of labor tasks, it possesses laboratory, room of entry of bottles, wash, filling, packing and offices of administration.

Systematized of productive line in 4.800 bottles of 2 liters per hour (daily total 230.400 lts.) and 1.000 cans of 6 liters per hour (daily total 144.000 lts.)

From the own spring wherefrom the water extracts the whole circuit to itself, as absolutely all the facilities they are in stainless steel.

The whole line of division, put in march and subsistence was and it is carried out by engineers specialized in the industrial development of mineral water.

At the recent act of opening of the plant governmental authorities were present for be considering to be the second industrial plant of major importance for the whole Uco's Valley.

Mayor Martín Aveiro (Right)

Page 2: IT PLANTS BOTTLING WORKS OF MINERAL NATURAL WATERdeals.chinagoabroad.com/Uploads/2016-02/56b169330df51.pdf · Model plants of By installments and Packaging of Mineral Water This plant

The factory commercializes under four own brands the product in packings of half a liter, 1 liter, 1,5 liters and 6 liters. The water is characterized by his low level of sodium and his mineral composition of maximum purity.

Also the plant has a project of extension to take his current production to 8 to 10 times more.

Page 3: IT PLANTS BOTTLING WORKS OF MINERAL NATURAL WATERdeals.chinagoabroad.com/Uploads/2016-02/56b169330df51.pdf · Model plants of By installments and Packaging of Mineral Water This plant

Photographies of machinery and facilities

Page 4: IT PLANTS BOTTLING WORKS OF MINERAL NATURAL WATERdeals.chinagoabroad.com/Uploads/2016-02/56b169330df51.pdf · Model plants of By installments and Packaging of Mineral Water This plant
Page 5: IT PLANTS BOTTLING WORKS OF MINERAL NATURAL WATERdeals.chinagoabroad.com/Uploads/2016-02/56b169330df51.pdf · Model plants of By installments and Packaging of Mineral Water This plant
Page 6: IT PLANTS BOTTLING WORKS OF MINERAL NATURAL WATERdeals.chinagoabroad.com/Uploads/2016-02/56b169330df51.pdf · Model plants of By installments and Packaging of Mineral Water This plant
Page 7: IT PLANTS BOTTLING WORKS OF MINERAL NATURAL WATERdeals.chinagoabroad.com/Uploads/2016-02/56b169330df51.pdf · Model plants of By installments and Packaging of Mineral Water This plant

Model plants of By installments and Packaging of Mineral Water

This plant of the private capital is that of major production in the zone where he is. The same one was inaugurated in December of 2.012 and it possesses in the day

of today all the local, provincial and national qualifications for the commercialization of his product. The dump arises from where the mineral water is obtained is 100 % property of the same plant, of use and with great flow, assets and of discharge in

the day of today in the General Department of Irrigation of the Province of Mendoza.

Value of Sale u$s 2.800.000

Page 8: IT PLANTS BOTTLING WORKS OF MINERAL NATURAL WATERdeals.chinagoabroad.com/Uploads/2016-02/56b169330df51.pdf · Model plants of By installments and Packaging of Mineral Water This plant

AIR SIGHT

References:

Pozo: Water well

Servidumbre de Paso: Street with piping

Planta: Plant

Ingreso: Entry