IT Website Project IT Website Project for BWX Technologies for BWX Technologies Contact: Contact: John Knowles, IT Manager John Knowles, IT Manager Date: Date: May 8, 2003 May 8, 2003 Consulting Firm: Consulting Firm: IT Design Services IT Design Services Consultant: Consultant: Adrian Lanning Adrian Lanning

Upload: nedaa

Post on 23-Jan-2016

27 views

Category:

Documents


0 download

DESCRIPTION

IT Website Project for BWX Technologies. Contact: John Knowles, IT Manager Date: May 8, 2003 Consulting Firm: IT Design Services Consultant: Adrian Lanning. Table of Contents. BWXT Overview The Problem The Solution How We Do IT Design Development Deployment Conclusions. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: IT Website Project  for BWX Technologies

IT Website Project IT Website Project for BWX Technologies for BWX Technologies

• Contact:Contact: John Knowles, IT ManagerJohn Knowles, IT Manager• Date:Date: May 8, 2003May 8, 2003• Consulting Firm:Consulting Firm: IT Design ServicesIT Design Services• Consultant:Consultant: Adrian LanningAdrian Lanning

Page 2: IT Website Project  for BWX Technologies

Table of ContentsTable of Contents

• BWXT OverviewBWXT Overview• The ProblemThe Problem• The SolutionThe Solution• How We Do ITHow We Do IT

– DesignDesign– DevelopmentDevelopment– DeploymentDeployment

• ConclusionsConclusions

Page 3: IT Website Project  for BWX Technologies

BWXT Company HistoryBWXT Company History

• BWXT Technologies, Inc., (BWXT) of Lynchburg, VA, is a BWXT Technologies, Inc., (BWXT) of Lynchburg, VA, is a diversified manufacturer of nuclear components and diversified manufacturer of nuclear components and advanced energy products with operations in ten states.advanced energy products with operations in ten states.

• BWXT has managed the site for the U.S. Department of BWXT has managed the site for the U.S. Department of Energy since 1997Energy since 1997

• BWXT IT Department provides 26 services to BWXT BWXT IT Department provides 26 services to BWXT

divisions and employees all over the US.divisions and employees all over the US.

Page 4: IT Website Project  for BWX Technologies

The ProblemThe Problem

• IT Staff being over-loaded by large call IT Staff being over-loaded by large call volume.volume.

• IT Staff forced to do data entry when keeping IT Staff forced to do data entry when keeping records.records.

• All record-keeping done in an off-line All record-keeping done in an off-line database, if at all.database, if at all.

Page 5: IT Website Project  for BWX Technologies

Our SolutionOur Solution

Page 6: IT Website Project  for BWX Technologies

End-Users Make RequestsEnd-Users Make Requests

Page 7: IT Website Project  for BWX Technologies

Staff-Users Manage Staff-Users Manage RequestsRequests

Page 8: IT Website Project  for BWX Technologies

Admin-Users Manage UsersAdmin-Users Manage Users

Page 9: IT Website Project  for BWX Technologies

How We Do ITHow We Do IT

• Project AcceptanceProject Acceptance

• Preliminary Investigation Preliminary Investigation ReportReport

• ScheduleSchedule

• Requirements ChecklistRequirements Checklist

• DevelopmentDevelopment

• DeploymentDeployment

Page 10: IT Website Project  for BWX Technologies

Preliminary Investigation Preliminary Investigation ReportReport

• Define project scope. Define project scope.

• Define benefits of project.Define benefits of project.

• Identify key information needs.Identify key information needs.

• Identify system constraintsIdentify system constraints

Page 11: IT Website Project  for BWX Technologies

ScheduleSchedule

• The timeline serves The timeline serves as our guide and as our guide and helps client helps client understand processunderstand process

• Developed early-on Developed early-on and and checked/updated checked/updated frequentlyfrequently

Page 12: IT Website Project  for BWX Technologies

Requirements ChecklistRequirements Checklist

• What is the purpose of the requirements What is the purpose of the requirements checklist?checklist?

• The requirements checklist serves as our The requirements checklist serves as our contract of what will be developed.contract of what will be developed.

• Most importantly, it defines all Outputs Most importantly, it defines all Outputs and Inputs of the final system.and Inputs of the final system.

Page 13: IT Website Project  for BWX Technologies

DevelopmentDevelopment

• Iterative ProcessIterative Process– Create Prototype for 1 pageCreate Prototype for 1 page– Obtain approval of prototypeObtain approval of prototype– Develop full version of pageDevelop full version of page– Obtain approval of full versionObtain approval of full version– RepeatRepeat

• Database evolves as neededDatabase evolves as needed

Page 14: IT Website Project  for BWX Technologies

Database StructureDatabase Structure

Page 15: IT Website Project  for BWX Technologies

DeploymentDeployment

• System developed such that System developed such that deployment on target system took deployment on target system took less than 5 minutesless than 5 minutes..

• Deployment ProcessDeployment Process– Files transferredFiles transferred– Base path updatedBase path updated

Page 16: IT Website Project  for BWX Technologies

ConclusionConclusion

• Success: Success: – Client involved throughout.Client involved throughout.– Delivered on-time and on-budget.Delivered on-time and on-budget.– Client happy with solution to his problem.Client happy with solution to his problem.

• Another useful program successfully Another useful program successfully developed by IT Design Services.developed by IT Design Services.

• Interested in having your problems solved?Interested in having your problems solved? Contact: Contact: Adrian Lanning Adrian Lanning

[email protected]@yahoo.com