Service Management System CHAPTER 1 Project Charter 1.0 Project Background Property Management System (PMS) manages all the properties or equipments that the company owns. Detailed information of properties including the status of equipment if it is in good condition or needed to repair and generate reports of lost item. 1.1 Problem Opportunity Description It is difficult for the personnel to track down the properties on whom /where it place or used. The property status whether the item is under maintenance, lost or in good condition cannot be monitored easily. There is no notification for rent status, renewal of license and insurance of property. 1.2 Benefits Computerized process lessens the work of the company resulting to more comprehensive and reliable information. Also, it will help to minimize the costs and expenses of consumable materials by the use of integration of the subsystems. The property management system will keep the company’s confidential records into the database. The data will be secured for Property Management System 1

Upload: phungnga

Post on 04-Jun-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

CHAPTER 1

Project Charter

1.0 Project Background

Property Management System (PMS) manages all the properties or

equipments that the company owns. Detailed information of properties

including the status of equipment if it is in good condition or needed to repair

and generate reports of lost item.

1.1 Problem Opportunity Description

It is difficult for the personnel to track down the properties on

whom /where it place or used.

The property status whether the item is under maintenance, lost or

in good condition cannot be monitored easily.

There is no notification for rent status, renewal of license and

insurance of property.

1.2 Benefits

Computerized process lessens the work of the company resulting

to more comprehensive and reliable information. Also, it will help to

minimize the costs and expenses of consumable materials by the use of

integration of the subsystems. The property management system will keep

the company’s confidential records into the database. The data will be

secured for unauthorized person to view. When it comes to performing

tasks, it will increase efficiency and rapidity of personnel’s performance.

1.3 Goals

Property Management System 1

Page 2: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Using the system and the database, the files are more secure

from unauthorized person. The needed information of property

is easy to locate or find by the personnel.

Property Management System is a monitoring system. It will show

all the needed information and categorize the information

depending on the user’s needs.

The proposed system automatically notifies the system user for

reminders like renewal of license and insurance to lessen the

delay of payments on the company.

1.4 Stakeholders and Clients

This section identifies the involvement of stakeholders and clients

to the project.

The Proponents- the developer of the project. It involves the

project team that will be developing the system.

Marban Agency – organization that allow will allow the

proponents to know the process or the information of service

management. The company who will be benefited after

implementation.

Mr. Dennis U. Gonzales (Project adviser) – the person who will

guide the proponents to achieve their goal and objectives. He

will supervise the team and advise the right things to do with the

system.

All stakeholders are not equal, every stakeholder has his own

expectations, and requirements, and he should be handled the way

he expects. Knowing them, their needs, expectations, and

Property Management System 2

Page 3: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

requirements increase the chance of a project’s success. If any

important stakeholder is missed then in later stages the project

manager may face many difficulties  e.g. causing a delay in project,

cost overrun, and in the most severe case – the project may be

terminated.

2. Project Scope

2.1 Objectives

WBS (WORK BREAKDOWN STRUCTURE)

PLANNING

Group Planning

Group meeting about the project

Ask for the suggestion in respective adviser.

Discuss about the project plans

Give a task to each member

Group plan initiation

Gather information about the project

Prepare questions about the project

Find organization or group which is involved in the project

Prepare a letter for the interview

Group plan execution

Interview.

Collect all the information from the interview.

Discuss all the collected information to the project adviser.

Ask for adviser’s comments/ suggestions.

Documentation

Property Management System 3

Page 4: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Document Preparation

Prepare all the gathered information from interview and

adviser’s comment/suggestions.

Study about the creation of documentation

Set plans for documentation.

Assigning of task depending on the member’s duty

Document analysis

Analyze all the information gathered.

Finalize the scope with other subsystems.

Document Creation

Start of documentation

Creating Diagram

Document finalization

Group analysis.

Checking of adviser.

Final revision of document

System Development

System Development Planning

Prepare the documents.

Analyze the cost and time in developing the system

Create plan about the development

Prepare all the resources needed(hardware and software)

System Development and Designing

Database design based on the documentation

Coding of project system based on the documentation

Property Management System 4

Page 5: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Transition and designing of system based on the

documentation.

Debugging

Refining of process.

System Integration Testing

Database test connection.

Check for bugs

Debugging of systems

Finalize integration

System finalization and Implementation

Finalize the project system.

Prepare the executable or installer of system and database.

Maintenance

Check for the feedback from the system user.

2.2 Deliverables

Work Break-Down Structure (WBS)

PLANNING

Group Planning

Project Deliverable Work Products/DescriptionGroup meeting about the project

Discuss about the assign sub-system in their group

Ask for the suggestion in respective adviser

Know the comment of your project adviser. Ask the suggestion about the subsystem and ways on how to gather information

Discuss about the project plans

Group discussion about the plan on how to take the first step of gathering the information

  Give a task to each member Assigning of member's duty categorized by their skills and knowledge

Property Management System 5

Page 6: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Group plan initiation

Project Deliverable Work Products/DescriptionGather information about the project

Research in the books or internet related about the subsystem

Prepare questions about the project

Analyze the gathered information and make a question about the subsystem

Find organization or group which is involved the project

Locate organization or group which is connected or have the same process like your subsystem

Prepare a letter for the interview

Prepare letter for interview and ask for authorization to interview

Group plan execution

Project Deliverable Work Products/DescriptionInterview Conduct an interview to the organization

to ask about all the needed information about the project system

Collect all the information from the interview.

Collect all forms and letters that gives information about the system

Discuss all the collected information to the adviser

Show all the collected information from interview including forms, letter and answers to the questions made by the proponents to the project adviser

Ask for adviser’s comments/ suggestions.

Ask for comments or suggestions on how to create the documentation based on the information that has gathered.

Property Management System 6

Page 7: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Documentation

Document Preparation

Project Deliverable Work Products/DescriptionPrepare all the gathered information from the interview and adviser's comments/suggestions.

Gathered all the needed information and classify their importance to the documentation.

Study about the creation of Documentation

Learn how to create the detailed documentation research and view sample from the books

Set plans for documentation Proponents plans or procedures to create the documentation

Assigning of task depending on the member’s duty

Assigning of task for each member based on their role in creating documentation.

Document analysis

Project Deliverable Work Products/DescriptionAnalyze all the information gathered.

Analyze all the gathered information needed in documentation. Categorize each based on their information.

Finalize the scope with the other subsystems.

Process or the scope must be finalized before creating the documentation. Conduct group meeting with other subsystems to understand and discuss the scoping

Document Creation

Project Deliverable Work Products/DescriptionStart of documentation Documentation about the opportunity,

benefits, goals and etc. documentation about the system Importance

Creating Diagram Diagram shows the process and the logical

structure of the propose system also part of

documentation

Property Management System 7

Page 8: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Document finalization

Project Deliverable Work Products/DescriptionGroup analysis Analyze or review of the proponents about the

finish documentation

Checking of adviser Checking of project adviser is important to

know how to refine the documentation. Ask

for feedback.

Final revision of document Change all the wrong and not needed information and also add the needed information base on the adviser suggestion

System Development

System Development Planning

Project Deliverable Work Products/DescriptionPrepare the documents Prepare the documents to serve as a basis for

the developmentAnalyze the cost and time in

developing the system

Group discussion on how to develop the

propose system. Analyze the cost and time

management of the proponents.

Create plan about the

development

Plans about the developing stage. The steps

needed to obey by the proponent to meet the

exact time or deadline off propose system

Prepare all the resources

needed (hardware and software)

Resources must be prepared. All needed

material computer and the place. Also the

software needed by the system developer

also must be prepare before proceeding to

the next step of system developing

System Development and Designing

Property Management System 8

Page 9: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Project Deliverable Work Products/DescriptionDatabase design base on the

documentation

Designing of database according to the documents

Coding of project system base

on documentation

The process and needed transaction base on

the document was in coded to make propose

system

Transition and designing of

system based on the

documentation

Outlook design of project and transition base

on the documentation.

Debugging Debugging or primary testing of system

without the integration

Refining of Process Refining the process of the system

System Integration Testing

Project Deliverable Work Products/DescriptionDatabase test connection Testing of database connection in other sub

systemCheck for bugs Errors and bugs testing in integration

Debugging of systems Correcting the errors and bugs in the system

Finalize integration Finalize the integration of the system

System finalization and Implementation

Project Deliverable Work Products/DescriptionFinalize the project system Finalize the system

Prepare the executable or Convert the propose system to executable

Property Management System 9

Page 10: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

installer of system and database system

Maintenance Check for maintenance of the propose system

Feedback of the system user Receive feedback from the client or system

user about the propose system for innovation

2.3 Out of scope

Out of scope also known as the limitation of project. Shows the

other process which not in the propose system. This process in the

other sub system

Assigning of property to the HR

Approval for buying new item.

Cannot generate purchase order request

The property management is not responsible in filing cases

regarding about the damage or lost of properties.

3. Project plan

3.1 Approach and methodology

Gathering and analyzing – gathering all the information in different ways

is the method of the proponents. Collecting small and large details/ data

will help to develop the system reliably correct. The gathered information

should deeply analyze by the proponents to classify the needed

information only and use them in the developing of project.

Property Management System 10

Page 11: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Good management – good management is a strategy or method on how

to manage a team. Good management depends on the Project manager.

Even the members are required to have the skills and knowledge if the

leader can’t handle the group correctly.

3.2 Project Timeline

ID Task Name Start Finish Duration

1 Planning July August 1 month

2 Documentation August October 3 months

3 System Development 2nd semester 2nd semester -

4 System finalization and

Implementation

2nd semester 2nd semester -

3.3 Success Criteria

In this part of documentation, the proponents discussed the success

criteria that servers as a basis/ guide for the system to meet its goal and

objectives. It can be used to determine the success of the system and its

functionalities. Success criteria is the basis of good system it show the

characteristics of good system.

3.3.1 Accessibility- the system must be accessible for the authorize

personnel of the company such us admin and in charge Employee can do

when using it. It must be understandable or easy to manage by the user.

3.3.2 Accurate- Handles transaction correctly without discrepancies in any

form must be accurate.

Property Management System 11

Page 12: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

3.3.3 Useful and timely information- the information must be up to date

whether daily weekly and monthly or even annually it can produce reliable

report for meeting or any case situation needs.

3.3.4 Efficient- the system must be fast and quality -assured. It should be

strong during employees’ peak hours to avoid disruption of work and

inconvenience to the customer.

3.3.5 User friendly- it means that the system must be easy to understand

and use whether the user is well knowledgeable

3.3.6 Reliable- the information shown in the system must be correct.

There’s a big problem if the information want to see by the user is different

from there what expected.

3.4 Issues and Policy Implementation

In developing an integrated system, there are issues that surely happened

before or during the finalization of the transaction between the other

subsystems.

3.4.1 Misinterpretation of system process- Probably the most common

issue that usually occurred. This is cause of unfamiliarity with the system

title itself that’s why research is needed to be done to clarify what the

system for.

3.4.2 Distribution of transactions- In distribution of transaction to one

system to another it had been made a conflict situation on how will one or

two transactions affect the whole process of the system. It was decided

that every transaction that will be having the same role, connection or

function with other subsystem must undergo consultations and double-

checking.

3.4.3 Connectivity of subsystem to another subsystem- It is said to be

the complicated part of integration. This may vary from two to three

Property Management System 12

Page 13: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

subsystems that are really connected by main of transaction testing the

highest possibility of errors during data and transaction sharing can trigger

the transaction process.

3.4.4 Data sharing- Subsystem shared one to two databases from one

server. This kind of integration was the challenging part for the proponents

of each group that must be critically plan before doing it on hand.

3.5 Risk management

Risk management is about the problem that may be encounter by the

proponents while developing or after the developing of propose system. So

it’s very important to identify those problems before it happens

Risk management plan

L – Low 0 - 30%

M – Moderate 31 – 70%

H – High 71- 100%

Risk Factor Probability

Impact Risk management action

Negligence of

members

M H Properly manage and monitor the

member by the project manager

Financial problem M H Contribution for the group activities

Wrong information

process

L H Analyze all gathered information

Miscommunication

between the group

M H Group meeting and discussion

about the project and their task

Property Management System 13

Page 14: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

members

Delaying of plan M H Soon as possible re scheduling

Adviser complains M M Aim for 100 percent correctness of

process to avoid the complains of

the adviser

Client complains L H Know all the process including small

and very important details to avoid

client complains

3.6 Service Transaction

This are the requirement in using the propose system in to the client

company

- Client should have computer(s) to operate the system.

- Client computer must have higher specification in hardware and software

to avoid the problem in implementation process

- Client must have knowledgeable user to run and manage the system

3.7 Option analysis

- Using this proposes system or not it’s still depending on the client.

- If this propose system did not pass to the client expectation, the client can

choose or find other developers

4 Technical Features

Property Management System 14

Page 15: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

The propose system (PROPERTY MANAGEMENT SYSTEM) in a

monitoring system that identifies the status of property. Viewing of all

information based on the in coded data on database and detailed shown

in the propose system. Secured, easy to operate by the user and reliable

information are in the propose system. Features of this are the

automatically notification of reminders and fast viewing of information in

categorize by user needs.

5.0 Project Organization and Staffing

ROLE NAME RESPONSIBILITIES

PROJECT MANAGER Ramos, Christian

Joseph De Ocampo

Manages the team

Planning Strategy

Project Initiation

Project Control

Risk Management

Resolving the issues

Budget the project

SYSTEM ANALYST Amacio, Chanie De

Guzman

Handling of business

rules

System Design

Technology Analysis

Business

Requirements

DOCUMENT

SPECIALYST

Visitacion, Clarisa L. Analyze the audience

Documenting the

process

Craft the right

message

Distil the message into

effective documents

Release the

Property Management System 15

Page 16: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

documentation

Evaluate the results

BUSINESS ANALYST Bacay, Kenneth Ramos Analyze business

process

Business plans

Monitoring

Translate Business

process

Requirement Analyst

Communicate w/ clients

LEAD PROGRAMER Arizapa, Michelle Quintela System Coding

Handling System

Software

Development/Train

subordinates in

programming

Develops programming

methods

Correct errors on the

system coding

6.0 Project Budget

Item Description Cost

CHAPTER 2

Related Studies and Systems

Property Management System 16

Page 17: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

2.0 Introduction

In this chapter, it will show the originality and relevance of the proposed system from the systems that had been researched. It is important for a project to have a review of related studies to highlight difference in opinions, contradictory findings or evidence, and the different explanations given for their conclusions and differences by different authors.

2.1 Foreign Studies

2.1.1 CAFM Explorer: Property Management Software

CAFM Explorer provides a solution that enables you to effectively

manage a wide range of services under your management thus providing

information to Facility Managers and Contractors to optimize their

operation. The Property app enables you to establish a comprehensive

database of property information for any location, at any level of the CAFM

Explorer hierarchy.

Key features include:

Ability to manage single or multiple companies within one database

Easy navigational tree ensure simple management and retrieval of

all facilities information

Lease renewal, break clause and rent renewal tracking

Management of Health & Safety equipment and service request

Dynamic Link to property related Planned Maintenance activities

Storage and maintenance of hazardous element data such as

asbestos which can be easily imported

Ability to track condition of building elements including structure,

fabric and mechanical

Monitoring of building lifecycle costs and energy efficiency

Property Management System 17

Page 18: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Storage of all property related documents such as contracts, lease

agreements and Health and Safety documents

Easy to navigate storage of all company and property contact

information, including Fire Officers, First Aiders and Facilities

Managers

Generation of property management reports

Author: cafmexplorer.com

Date Published: 2012

URL: http://www.cafmexplorer.com/solutions/products/property-management/

2.1.2 Facilities Management Software

Managing assets is a critical component to the operations of any

facility or property. eMaint building maintenance software provides the

ability to identify, track, locate and analyze all of your corporate assets.

The asset explorer provides a user-definable "tree" view of assets, making

it easy to locate by the location, type, system or any other hierarchical

setting you choose. Keeping track of assets and their changing locations

is a challenge. eMaint gives you the ability to track asset locations so you

know where it is, where it's going and where it's been.

eMaint's web-based facilities maintenance software and property

maintenance software systems provide point and click access to all labor

and material costs right at the asset level. Gathering of all these costs is

accomplished through our powerful work order system.

Work Order Management

The eMaint Work Order center allows you to provide technicians

with a planned job, the proper procedures and the necessary parts and

tools they need to work without delays or interruptions. Labor, parts and

Property Management System 18

Page 19: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

purchases are easily tracked on the work order, allowing you to quickly

analyze the costs associated with facility maintenance management.

With eMaint, you'll be able to calculate response time and

completion rates, track performance, and provide a feedback mechanism

to keep your internal customers aware of the status of their work requests.

Service Request and Maintenance Request Software

Work requests - whether from owners, tenants, staff, students,

teachers, customers -- are at the cornerstone of operations and facility

management. Let's face it: there shouldn't be a "one size fits all solution"

to managing work requests. For some organizations, simplicity is the key.

Our "You've got work" feature makes submitting work requests as easy as

sending an email. Other organizations require a more robust solution. The

"My Requests" feature not only provides a customizable form for detailed

entry of the request, it provides a requester control panel to view the

status of pending, open and past work.

Vendor Portal for Secure Access

The optional vendor portal feature makes it easy for vendors and

outside contractors to acknowledge receipt of work details assigned to

them, update labor, material and other costs upon completion of the work,

and attach documents and images to the work order.

Each vendor is assigned a unique login that grants them access

only to the information you choose to share with them in a fully

customizable view.

Key Performance Metrics

Property Management System 19

Page 20: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

The Maintenance Dashboards in X3 property and facilities

maintenance software provides up-to-the-minute information on the key

performance metrics critical to your building maintenance program:

New work orders in last 24 hours

Percentage of work completed last week

Year to date number of work orders open

YTD Number of work orders completed

YTD Labor hours

YTD Material costs

Percentage of work orders over estimate

Turnaround times on work

Facilities Maintenance

Features in X3 CMMS Software Benefits for Facility ManagersWork Request Management Improve workflow efficiency and customer

satisfaction by providing a fast and easy tool for submitting facility work requests. Maintain customer satisfaction with automated alerts when customer requests are approved, rejected and completed.

Email Request Module Enables unlimited number of customers to easily submit requests via email that are automatically captured in your eMaint Request Center

Asset Explorer User-definable "tree" view of assets, making it easy to locate by the location, type, system or any other hierarchical setting you choose.

Asset Work and Charges History Point and click access to all labor and material costs right at the asset level.

Multi-Form Capability Easily capture the right information about your assets, regardless of the various types of assets that you manage.

Facilities Preventive Maintenance Provide an environment of the highest level of

Property Management System 20

Page 21: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

(PM) Management with Auto-Generate Capability and scheduling based on any trigger - calendar, meter or condition-based monitoring.

customer satisfaction and asset availability. Facility preventive maintenance ensures equipment is maintained regularly, not just repaired when it breaks. Automatically produce and email preventive maintenance (PM) work orders to ensure compliance and maintain optimum equipment performance.

Planning and Scheduling Tools The "Planner" interface lets you see the work that needs to be performed and assign it to available personnel. The tool includes customizable filters to view work by building, department, problem type, trade, or any other criteria needed to suit your business process.

Inventory Control Tools Reduce inventory spend and ensure the right parts are available at the right time

Workflow Manager Powerful configuration tool that lets you "define rules" - from auto-assigning work requests, to routing work orders via email, to calculating response time and completion rates -- and customize the CMMS functionality to match your specific business processes.

Personalized Dashboards and Reports Facilities maintenance management gains instant access to the key performance metrics critical to your operations, including:

New work orders in last 24 hours Percentage of work completed last week Year to date number of work orders open YTD Number of work orders completed YTD Labor hours YTD Material costs Percentage of work orders over estimate Turnaround times on work

Cost Tracking and Repair Histories Easily capture labor, parts and materials costs and measure maintenance spend by building, department, customer, cost-center, line or any user-definable criteria.

Property Management System 21

Page 22: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Mobile solutions with bar coding technology

Perform inspection rounds, manage work orders, and control inventory using a handheld device in the field.

Vendor Portal with Secure Login The optional feature allows vendors and outside contractors to acknowledge receipt of work details assigned to them, update labor, material and other costs upon completion of the work, and attach documents and images to the work order via a secure login.

Private Label Option With this optional feature, we will rebrand our software to include your company logo and corporate branding.

Author: emaint.com

Date Published: 2014

URL: http://www.emaint.com/facilities-maintenance-features/

2.1.3 OpenMaint

Open source solution for the Property & Facility Management; an

application for the management of buildings, installations, movable assets

and related maintaining activities

openMAINT helps the managing authority to know, organize and

update those data related to the asset inventory, in order to support their

decision and operative procedures.

A complete ready-to-use solution, i.e. it is configured with all

necessary base files, processes, reports and dashboards.

Property Management System 22

Page 23: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

 Has been customized in order to shape over the environment

where it operates, usually made up of procedures, documents, roles and

responsibilities, technical restrictions, textual data and georeferences,

external systems to interact, etc.

Complying with the rule, it can also be gradually activated with

successive extensions.

openMAINT is available with the functionalities needed to solve the

common management needs of the Property & Facility Management

Modules

openMAINT is made of the following modules:

Space & Asset Inventory

Facility Maintenance

Logistic Management

Economic Management

Energy & Environment

GIS & BIM support

openMAINT provides the following base features, which are common to

the various modules:

Web based user interface

Text and graphic browsing through the objects

Complete history of the changes on any data card (versioning)

Rapid and analytical searching functions for every card attribute

Definition of filters and views for an customized access to data

classifications and lookups which can be autonomously customized

document file used to match every kind of file with every kind of card

workflow engine integrated with a visual editor for the graphic design of

processes

report engine integrated with the visual editor for the report design

Property Management System 23

Page 24: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

possibility to define customized dashboards

complete outline of users, groups and permissions

interoperability with other applications through web service

CSV data import / export functionalities

possibility to configure and manage (task manager) automatic operations

possibility to configure connectors through external systems

possibility to autonomously model the data scheme:

creation of new typologies of objects (classes)

creation of new attributes on pre-existing objects (attributes)

creation of new typologies of relations among objects (domains)

 openMAINT is based on CMDBuild software

It was developed by applying the most advanced planning

guidelines and the best technologies:

Service Oriented Architecture, organized in components and

services that cooperate also with external applications through web

service

Ajax user interface (Ext JS libraries) which grant intuitiveness in the

use of the application, interaction with ergonomics, fast slew rate and

minimal latency

Server components realized with Java, which does not depend on

the platform, is solid, scalable and largely used by big organizations that

want to develop web enterprise applications also thanks to the validity of

the J2EE specifications and to the libraries and products of third parties

which realize its services

PostgreSQL, the most advanced and secure open source database

the workflow engine Enhydra Shark

the report engine JasperReports

the document file Alfresco

Property Management System 24

Page 25: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

the intranet portal Liferay

PostGIS, GeoServer e OpenLayers for the support of GIS

functionalities

BIMServer and BIMsurfer for the support of BIM functionalities

Author: openmaint.org

Date Published: 2014

URL: http://www.openmaint.org/en/project/features

2.1.5 Property and Asset Management

If your organization needs to hold and maintain an accurate record

of information on any aspect of its property portfolio, Manhattan offers a

world-class property management software solution.

Manhattan Property and Asset Management is the core of the

Manhattan property investment management solution. It provides the

capability to handle either simple or complex property data structures;

incorporating owner, landlord, site, land, property, tenant, customer,

occupier, lease and agent relationships. Setup is extremely flexible, with

users having the ability to modify or edit fields and configure screens

around data types.

For transaction management, Manhattan property management

has comprehensive, project based acquisition and disposals functionality.

While an event-driven diary management system that helps manage

common critical dates such as rent review, allows user-defined warning

periods and is compatible with third party email applications.

Property Management Software Benefits

Maximize income and reduced expenditure

Never miss an important event, such as break

dates, lease renewals and rent review with

Property Management System 25

Page 26: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

comprehensive diary management

Streamline reporting and data presentation

Improve interaction and relations between

stakeholders with web portals

Easily monitor supplier Service Level Agreements

(SLAs) with automated alerts and processes

Automate key business processes within-built

workflows

Support cross-border portfolios with asset type

and country specific functionality

Functionality

Core property database

User-defined field sets

Lease and rental management

Acquisitions and disposals

Diary System

Web portals

On-screen reporting

Search facilities

Document management

GIS integration

Executive dashboards

Author: manhattansoftware.com

Date Published: 2014

URL: http://www.manhattansoftware.com/solutions-emea/property-investment-

management-software/property-and-asset-management-software.html

2.2 Local Studies2.2.1 Property Management System

For property traders, property maintenance and also management

ought to be of perfect significance if one desires to achieve optimum worth

Property Management System 26

Page 27: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

in the market for their particular property. Nevertheless, numerous

proprietors tend to ignore the importance of property management either

because of insufficient knowledge about the problem or even they are

unable to garner adequate time to consider numerous aspects related to

the property. Several traders even tend to refrain from managing their own

property as they discover the job troublesome and demanding. In these

types of conditions, registering for a great online property management

system can be a helpful alternate.

In the last handful of decades, technical advancements have

performed a significant part in enhancing general effectiveness,

reorganizing procedures and also assisting property traders and property

administration firms obtain ideal control over their property management

problems. A property administration program can be merely understood to

be a software program designed and designed with the objective of

assisting clients handle and obtain optimum manage over every aspect

associated with their property. At the moment, property management

systems are now being utilized broadly in a number of sectors such as

real estate, consumer banking, hospitality, logistics, hotel management, as

well as managing intellectual property problems. Additionally, there are

various kinds of property management techniques available for sale,

thereby complicated users about which to pick.

On this regard, here are referred to some essential factors that will

help in selecting a property management system.

Exactly why do you want a PMS? : It is important to address this

problem and so as to choose software program that's aptly ideal for one's

Property Management System 27

Page 28: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

requirements and needs. For instance, a PMS necessary for a hospitality

industry must have functions that can relieve out visitor reservation, help

fast check-in, improve efficiency and produce a much better visitor

encounter. Alternatively, a PMS ideal for a property proprietor should have

procedures where one can preserve tenant database and manage

problems related to property upkeep. An adequately chosen and set up

property administration program can easily simplify your business

procedures considerably, thereby making your lifetime simple and also

comfy. Additionally, it is possible to get rid of human mistakes and improve

effectiveness by replacing manual procedures with user-friendly

interfaces.

Realize your requirements: Anytime you are planning to implement

a PMS within your business, it is necessary that you simply understand

what you actually need. Because of this, it is important to connect to all

those individuals who will be while using system straight or not directly. In

this way, one can obtain insight into their requirements and needs that

they really feel can improve their effectiveness and also make their own

jobs easy but fascinating. Additionally, one must actually take into account

viewpoints of individuals not really thinking about applying the system and

include their issues whilst looking out for a PMS. Furthermore, make sure

to consist of your technical personnel in these types of discussions as they

are the individuals concerned with the setup, integration and execution of

the system.

Make a checklist and obtain estimates: Make a summary of

functions that have been suggested. Generally, these types of lists usually

consist of a few features which are absolutely necessary, while others

may be very easily overlooked. Thus, whilst planning a summary of

Property Management System 28

Page 29: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

requirements and needs, it is very important segregate features

depending on the needs. When the checklist is actually prepared, one can

right now proceed using the purchasing procedure. Because of this, one

has to consider choices which fulfill the needs you have and suits in your

budget.

Think about your budget: It is important to determine how a lot one

can manage on obtaining a property management system. Currently,

there are lots of property management techniques available in the market.

All these techniques vary from each other in terms of features provided.

Appropriately, the cost variety also differs. By identifying the budget,

choice becomes simpler as one can easily get rid of options which are

outside the range.

Jinisys Software offers 4 types of property management system

namely, condominium property management system, real estate

management system, cemetery or entombment management system and

parking management system.

Property Management System allows the company to keep track of

lots/units per property, their current value and their status. The system

provides a tool for the company to easily manage pricing, payments, and

sales of units/lots. Also, it keeps track of payables for broker’ commission

and receivables for monthly amortizations.

The property management system is divided into two parts: web

based and desktop application. The web based provides a real-time view

Property Management System 29

Page 30: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

for broker on lots/units' current status per property while the desktop

application provides all other functionalities. The system will also be

integrated with another accounting or ERP back-office system.

System Requirement

Server

Workstation

Author: jinisyssoftware.com

Date Published: May 2014

URL: http://jinisyssoftware.com/property-management-system/#.VAhtUONdXro

Property Management System 30

Page 31: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

2.2.2 OneSite Property Management SoftwareThe RealPage multifamily property management suite gives you an

integrated, end-to-end workflow to smartly manage all your property

operations – from prospects to residents to site and corporate operations

– for enhanced productivity, reduced costs, and maximized revenue.

RealPage’s OneSite Leasing & Rents is an end-to-end, web-based

property management software solution used by various types of

multifamily property management companies to manage the complete

renter lifecycle.

It features powerful back office financial accounting and automates

property leasing, management, compliance and accounting activities. It

expedites and simplifies processes for leasing staff, like maintenance

requests, and serves as a powerful CRM tool for guest card management

and building relationships with prospects and residents.

OneSite also provides greater visibility into rental property

operations and financial activities for owners and managers. With

integrated document management, facilities, purchasing and central

reporting, OneSite is an essential system providing multifamily portfolios

all the resources they need for operational success, optimum efficiency at

the property and increased NOI.

OneSite Leasing & Rents Commercial is a powerful on-demand

management tool that gives owners and managers the ability to monitor,

analyze and execute standard policies and procedures for their

commercial office, retail, industrial, and mixed-use assets. It simplifies and

automates property management and lease administration, and helps

owners increase revenue and recovery potential by enabling the creation

of standardized or custom expense recovery methods for tenants.

Author: realpage.com

Date Published: 2014

Property Management System 31

Page 32: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

URL: http://www.realpage.com/onesite/

2.2.3 Optima Property Management SystemOptima PMS is a world leading Windows based Property

Management System that incorporates the latest in advanced technology.

It is designed to provide all the features of a sophisticated Front Office

system linked with other computerized hotel applications on the same

relational SQL database.

EFFICIENT MANAGEMENT Optima Property Management System places all the vital

information needed for optimum operation at the manager's fingertips. All

information can be viewed on-line, printed in a large variety of reports or

shown on graphs. Advanced icons and color-coding give the managers an

excellent overview of all hotel operations and allow them to maintain

precise management controls. It is a profitable marketing tool, as it

captures a wide range of data needed to make the correct marketing

analysis. Information analysis is simple and precise, emphasizing

revenues, budgets and yearly comparisons in combination with data of

occupancy, segmentation and other guest information.

Optima PMS enhances reservations management, streamlines all

accounting and billing, upgrades guest services, boosts staff productivity

and improves marketing and sales performance for all types of hotels. It

provides the hotels with all the tools necessary to give better, more

personal and more efficient service to the guests, the result being an

increase in the average price and the occupancy of the hotel, in an

environment that is constantly more demanding and more competitive.

EASY, FRIENDLY OPERATION Optima Property Management System has a unique open

architecture as a result of using standard industry development tools such

Property Management System 32

Page 33: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

as Power Builder. The Windows Graphical User Interface helps simplify

data entry, management inquiries and financial reporting. The simple user

interfaces also makes learning and using the system easy and quick, no

matter how big your hotel.

Using any combination of keyboard, touch screen or mouse, the

user can easily enter any data into the system and retrieve all the

information easily, quickly and efficiently. Optima is designed for simple

operation and maximum flexibility in functionality and performance that

creates a profitable and smoother operation.

FLEXIBLE, CUSTOMIZED CONFIGURATION Optima PMS has a flexible, open architecture that makes it simple

to define according to each individual hotel requirements. The hotel may

define its rooms by their features, group them together into different

buildings, wings, room types and room categories. It may also define

unlimited number of user-defined packages and plans, connected to

different prices controlled by a sophisticated rate management. It handles

travel agents, tour operators, companies and other kinds of customers

each with its own contract and room allocation. Other services can be

easily defined in the system including fixed or flexible prices.

Accommodation rate tables are as flexible as they can be and can be

entered in different formats.

Optima Property Management System main advantage is that it is

designed to meet each hotel's needs and procedures and not vice versa.

UNIQUE ADVANTAGESOptima PMS includes some unique features such internal revenue

management tools, internal and central data warehouse, dynamic reports

and graphs, daily snapshot reports sent to selective managers and owners

by e-mail, advanced modules supporting high levels of guest service,

internal and external CRM modules and Guest Service Centre program.

Optima streamlines processes allowing staff to give more attention to the

guests on one hand and save labour costs on the other.

Property Management System 33

Page 34: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

OPTIMA PMS INCLUDES THE FOLLOWING MODULES: The reservation module

• Room availability with drill down to a single reservation.

• Direct reservation from price quotation.

• Flexible rating and automatic calculation of the value of a reservation.

• Sharing and group member invoicing.

• Group Master accounts.

• Easy blocking for guest’s special requests.

• Comprehensive special services set-up, easily customized for each

hotel.

• VIP types and levels.

• Partial or fully automatic allocations depending upon reservation.

• Special requests automatically incorporated into the reservation from the

guest, group, agent or company history.

• Automatic commissions’ management

The guest reception module

• Clear, concise and quick check-in and walk procedures.

• Comprehensive guest history including preferences and photo

identification.

• Full primary and secondary agent history.

• Agent and company contracts.

The accounting and billing module

• Handles all aspects of multi-currency transactions and all types of V.A.T.

• Invoicing for non-room folios.

• Automatic cash flow calculation and control for each front desk agent at

any time.

• Automatic night posting.

• Advanced, easy to use city ledger (accounts receivable) module.

• POS and telecommunication charges transferred instantaneously to the

guest’s account.

• Automatic commissions deductions and reporting

Property Management System 34

Page 35: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Housekeeping and maintenance module

• Housecleaning assignments are prepared quickly according to

predefined parameters of work.

• Job orders are automatically sent to the maintenance department .

General system module.

• Log book

• Concierge information listing.

• Guest message and guest locator modules.

Report module with an extensive report generator

• Versatile reports for all levels of management.

• Statistical reports

• Occupancy and work assignment forecasting reports.

Author: silverbyte.com

Date Published: 2010

URL: http://www.silverbyte.com/optimapms.html

2.2.4 Rent ManagerComprehensive, Adaptive, Transformative Software

Rent Manager® is a completely integrated property management,

accounting, contact manager, and facility maintenance software suite. You

get the sophistication your back office personnel require and the simplicity

your managers need to be more productive and efficient. Available as a

stand-alone or cloud-based product, Rent Manager is a proven solution for

companies that manage all types of multifamily, single-family, and

commercial properties.

Rent Manager provides a robust accounting system that includes

general ledger, accounts payable, accounts receivable, budgeting, and

drill-down financial reports that integrate seamlessly with a powerful

property management/CRM database. Exceptionally customizable and

Property Management System 35

Page 36: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

ideal for properties of every size, Rent Manager enables you to increase

your productivity by organizing rental and maintenance information,

reducing delinquent accounts, and automating all accounting and

reporting.

KEY FEATURES:

Double-entry accounting

Keep your accounting in balance at all times.

Prospect and lease management

Manage potential customers, marketing campaigns, and leasing

agent performance.

Built-in work order management

Track items and inventory, manage projects, and create and print

work orders.

Follow residents through the entire lease cycle

Track everything you want to know about your tenants, roommates,

businesses, etc.

Integrated ACH and credit card processing

Receive electronic payments from residents and pay owners and

vendors online, in real-time.

Built-in marketing features

Track marketing campaigns, prospects, and quickly post

advertisements to Craigslist®, Zillow®, and Trulia® with a few

clicks of the mouse.

Manage and reconcile CAM**

Charge and reconcile CAM expenses using a variety of distribution

methods.

Extensive permissions and security

Control what each user can see and do within the program.

Virtual Post Office (VPO)

Property Management System 36

Page 37: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

With one mouse click, Rent Manager handles the printing, stuffing,

and mailing of letters and statements for you.

Integrated VoIP with NDT***

Make, receive, and record phone calls directly through Rent

Manager using our advanced Voice over Internet Protocol system.

Comprehensive utility billing features**

Handle meter reading, billing, and collection without paying a third-

party vendor.

Bird's Eye View mapping**

Create aerial-view pictorial maps of your properties for visual

reporting.

Integrated report writer**

Design your own reports with the information and calculations that

you need.

Manage owner-financed loans**

Track everything from loan terms, rates, and conditions to payment

scheduling.

More than 250 built-in reports

Examine and assess every aspect of your business with our

expansive reporting suite.

Drill-down reports

Click on a value in a report to trace its source and see how it was

calculated.

Outlook® and Google Calendar™ integration

Sync your personal calendar with the calendar in Rent Manager

and never miss another appointment.

Customizable screens, toolbars, and fields

Change the look-and-feel of Rent Manager to meet the needs of

each employee.

Custom document templates

Property Management System 37

Page 38: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Type keywords and Rent Manager searches its entire database for

matches.

Available as a stand-alone or cloud-based product

Choose the version that best fits your business needs.

Author: rentmanager.com

Date Published: May 1, 2013

URL: http://www.rentmanager.com/PropertyManagementSoftware/ProductInformation.

aspx

2.2.5 OnSite Property ManagerAffordable, professional rental property management software that

increases income, improves efficiency, and fills vacancies faster.

Benefits

Affordable

Easy to Use

Increases Income

Office Mobility

Paperless Office

Saves Time

Safe And Secure

Multi-User Access

Features

Auto-Posting Charges

Document/Photo

Storage

Expense Tracking

Move-In/Move-Out

Owner Reporting

Paperless Work Orders

Preformatted Letters

Rent Roll Format

Role-Based

Permissions

Vacancy Advertising

Variable Rental Terms

Property Management System 38

Page 39: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Here are just some of the newest features we’ve added in response to our

member requests:

Operating Statement - rolling 12 month report showing income,

expenses, and account balance(s)

Batch Payments - for recording multiple checks or payments at one

time

Tenant Highlighting - 5 colors for you to choose from and use for

your own purposes

Postcard Printing - so you can save money if you mail tenant

invoices

Rent Roll Filtering - new unit status icons and over 20 ways to filter

your Rent Roll page

Color Preferences - set your own colors for debits, credits, and

balances on the transaction page

Property Management System 39

Page 40: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Report Preferences - choose dates/periods, sort columns, email or open in Excel with 1 click

Administrator Report - logs common tenant and financial actions performed by users

International Date Formats - 9 different date formats to suit countries around the globe

Author: onsitepropertymanager.com

Date Published: 2014

URL: http://www.onsitepropertymanager.com/features/

CHAPTER 3

EIS PROJECT MANAGEMENT AND DEVELOPMENT

3.1 Risk Mitigation, Monitoring and Management Plan

1.0 This section gives a general overview of the Risk Mitigation,

Monitoring and Management Plan for the subsystem Property

Management System (PMS)

1.1 Scope and Intent of RMMM activities

Risks on software development project must be

successful software system. Lack of defined approach to risk

management is one of the common causes for project

failure. To improve project chances for success, this work

Property Management System 40

Page 41: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

investigates possible risk impact areas to perceive a

foundation that can be used to define a common approach to

software risk management.

1.2 Risk Management Organizational Role

Stakeholders who are involved in the system

development also have corresponding responsibilities or role

in managing the risk. If only if everyone did their role before

or during the system development.

Software development can avoid risk by determining what

really is included in the subsystem, product size and

clarifying what can the subsystem do for the user.

The proponents can avoid risk by keeping themselves

informed and knowledgeable about the project they’re

working into.

The company that had been interviewed can help avoid the

risk by providing all necessary information about the

business process of the system.

The proponents can avoid the risk by estimating earlier on

how much will it takes in making the project to provide

sufficient resources for it.

2.0 Risk Description

This section describes the risks that are likely to be encountered in

this project.

2.1 Risk Table

Property Management System 41

Page 42: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

The following table describes the risks associated with the project.

The appropriate risk category, probability and impact are given.

2.1.1 Description of Risk m

Development Risk:This risk involves problems such as insufficient resources

and misused of strategies that may occur during the

development of the subsystem. If the proponents fail to

be trigger and caused failure, also the financial problem.

Customers Risk This risk involves misinterpretation about the system that

will be developing. If the company that has been

interviewed provide inaccurate information about the

business it will caused the proponents to be misled in the

size and scope of the subsystem

Process RiskThis risk is concern with the Advisers Complained where

the proponent has to change the done documentation

and software development in to a new process.

Business RiskThis risk involves the client complained where the

proponents must have to adjust in the client wants to

happen in the system or in the software development and

in the adviser advice.

Employee Risk:It involves Negligence of the members where the

proponents dint ‘do their jobs that Cause delay in terms

of the development of the system.

Employee Risk:This is the risk where concern is Miscommunication of

the group members especially when the proponents have

Property Management System 42

Page 43: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

difficulties in the other members of the groups that Cause

delay in the development of the system.

2.1.2 Probability and Impact for Risk m

The following is the sorted version of the above table

by probability and impact:

Category Risks Probability ImpactEmployee Negligence of members 2 3

Employee Miscommunication

between the member

2 2

Employee Delaying of plan 2 2

Development Financial problem 3 4

Customer Wrong information

process

2 3

Process Adviser complained 2 2

Business Client complained 2 3

Table- Risk Table (sorted)

Impact Values Description1 Catastrophic

2 Critical

Property Management System 43

Page 44: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

3 Marginal

4 Negligible

The table represents the risks that can be encountered in software

development. It is sorted by category and gives a brief description of risk

in Risk Column and also provides the probability of risk in Probability

Column and also the impact of the risk in the Impact column.

3.0 Risk Mitigation, Monitoring and Management

This section in detail describes Risk Mitigation, Monitoring

and Management for each of the possible risks. It will discuss the

ways on how to avoid, prevent, monitor and manage the risks.

3.1. Risk Mitigation for Risk m

In this section, six (6) possible software development

risks will be identified. To mitigate is to prevent from huge

losses. Plans are drawn to avoid or prevent the

consequences if only if the risks occurred.

3.1.1 Development Risk

To avoid the insufficiency of resources and

misuses of strategies, the proponents will make sure

that the plan they started have to meet its goals.

3.1.2 Customers Risk

In this risk the proponent’s going to analyze the

problems and identify the needed information before

gathered information about the client needs.

Property Management System 44

Page 45: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

3.1.3 Process Risk

In this risk the proponents must to have a

weekly consultation to their adviser to monitor their

doings in every week so that the proponent must be

minimize the miss understanding between the

adviser’s advice and proponents side, also the

redundancies in terms of the development of the

system.

3.1.4 Business Risk

In this risk the proponents must have to clarify

the client wants to happen in the development of the

system specially the process, the procedures and

then the features of the system.

3.1.5 Employee Risk

About the negligence of the members the

proponents must have to understand the side of the

others members of the group, also the Project

manager must have to remind the job of his

proponents about their contribution in the

development of the system.

3.1.6 Employee Risk

In this risk in miscommunication of the

members the proponents must have to understand

the side of the others members of the group, also the

proponents must have to unite and bund when the

development of the system is started.

3.2 Risk Monitoring for Risk m

Property Management System 45

Page 46: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

In this section, the proponents will discuss the risk on

how will it be monitor and determine ways to much likely to

reduce the existence of the risk.

3.2.1 Development Risk

For the monitoring of the risk, the proponents

will focus on the available resources and keep an eye

on new technology offered. The activities that have

been settled will be checked if the strategy that the

proponents used is effective or not. Keeping an eye to

the progress is applicable.

3.2.2 Customers Risk

In monitoring the risk, in case that the

information that we gather is not accurate in the

information that the proponent needed, the proponent

well be going to find alternative bases information that

we can include in to the development of the system

like comparing the process or procedure into the co

integrated system.

3.2.3 Process Risk

Inters in monitor the risk of the advisers

Complain proponents will be going to check the

documentation and the other procedures of the

development weekly about the advisers complained

to minimize the possible problems that the proponent

my encountered.

Property Management System 46

Page 47: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

3.2.4 Business Risk

In monitoring risk of the client need the

proponent have to monitor the client need in setting a

meeting to the client to identify what kind of process,

procedure and features the client what to happen in

the development of the system.

3.2.5 Employee Risk

In monitoring the Negligence of the members

the proponent must have to know there responsibility

in the development of the system, the project

manager must have to unite his proponent to make

sure that the relationship of his proponent is united as

one for the development of the system

3.2.6 Employee Risk

In terms in monitoring this risk

miscommunication of members the proponent

must have to know there responsibility in the

development of the system, the project

manager must have to unite his proponent to

make sure that the relationship of his

proponent is united as one for the development

of the system

3.3 Risk Management for Risk m

3.3.1 Development risk

In the management phase, if the resources and

strategies used did not work out well in the software

Property Management System 47

Page 48: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

development. The proponents will use another

approach or methods to finish the desired output of

the project.

3.3.2 Customer Risk

In managing the Risk, wrong information

process, the proponent must to analyze the risk then

change a possible problems that the proponents my

encountered

3.3.3 Process Risk

In Managing the process risk about the

adviser’s compile the proponents must have to

change said changes base on the complained of the

adviser for the development of the system.

3.3.4 Business Risk

To manage this risk the client complained, the

proponent must also have to change the system

based on the said changes that the client want for the

development of the system.

3.3.5 Employee Risk

As managing the risk of negligence of the

members, each proponents of the team must have to

set a meeting to talk about the recently happen in to

your team, and to make sure that in the next phase of

the development the problems that you encountered

will never happened again. Or simply the proponent

can handle it much better

Property Management System 48

Page 49: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

3.3.6 Employee risk

In managing the miscommunication of the

members, the proponent must have discussion about

the process of the proposal system.

3.2 Software Configuration Management Plan

1.0 Introduction

1.1 Scopes and Intent of SCM Activities

1.2 SCM Organizational Role

2.0 SCM Task

2.1 Identification

2.1.1 Description

2.1.2 Work product and documentation

2.2 Configurationally control

2.2.1 Description

2.3 Version Control

2.3.1 Description

2.3.2 Increasing Version number

2.3.3 Work product and documentation

2.4 Configuration Status Accounting (CSA)

Property Management System 49

Page 50: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

2.4.1 Description

2.4.2 Work Product and documentation

1.0 Introduction

1.1 Scopes and Intent of SCM Activities

The purpose of SCM is to know the changes and upcoming

changes to the project. Determine the scope and out of scope of the

system. Guide us to lessen the mistakes. Any changes will result into a

big change to the output or small, it depends on the changes. Changes

into the project have a negative effect to the team. Example of this is

when you change your transition on system it cost time delay, budget

and added task to the member meaning to say SCM in a useful guide

for the developing team.

SCM activities are develop to

Identify change

Control chance

Make sure the change properly implement

Also have a way to document the change.

1.2SCM Organizational Role The person or organization involved in the changes, who lead to

the rightful process for developing the propose system.

Project Adviser: Sir Dennis Gonzales

School Professor: Sir Rico Bundoc

Property Management System 50

Page 51: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Agency or company: Malban and Matrix Security Agency

Team Member:

Ramos, Christian Joseph D.O - Project manager

Visitacion, Clarisa Llego - Document Specialist

Amacio, Chanie De Guzman -System analyst

Bacay, Kenneth Ramos -Business analyst

Arizapa, Michelle Quintela -Lead programmer

2.0SCM Task

In this section the team will try to detailed all important SCM task will

assign for each member. Doing their own task will lessen the changes in the

system.

Ramos, Christian Joseph D.o – Project planner, initiating the plan,

manage the group and leader of the team.

Visitacion, Clarisa Llego .- Document specialist grammar and

document expert

Amacio, Chanie De Guzman - System analyst, transition ,design

and process

Bacay, Kenneth Ramos - researcher, who gathered the

information

Arizapa, Michelle Q. - Lead programmer , the coder for the

system

2.1 Identification

In this section, the proponents discussed about the software

configuration and identify the SCM plans

Property Management System 51

Page 52: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

2.1.1 Description

Identify the changes- the proponents suggest changes in the

development of the system, gather information and more interviews

to identify what are the most important changes that we have to put

in the software development and to figure out if the changes are

necessary to do for the software development.

Approve changes – the proponents think of having a control when

it comes to changes in the software development. In that way,

organizing the group members and giving them a specific role in

the software development is important for us. In this case your job

title is your only job in this development you cannot allow to change

something in the development unless if it is needed and important.

But before doing some changes you have to talk to the rest of the

proponents.

Ensure the changes is being properly implemented – in this

case if there are changes in the software development the

proponents must have to spend time to check and make sure that

the changes is properly implemented to finalize the software

development.

Document changes – since the software have changes, the

proponents must also have to change the documentation

specifically the contents. Revision is also a consideration.

2.1.2 Work product and documentation

Identify the changes – Once the changes are identified, a change

request form will be produced and will be sent to all proponents

Property Management System 52

Page 53: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Approve changes – After evaluating the proponents, you have to

change the request form, change report from will be generated.

Ensure the changes are being properly implemented.

Document changes – Once the changes are provided, the

proponents will document the changes in the library. And they will

change the software version number if it is necessary.

2.2 Configurationally control

2.2.1 Description

Steps in controlling the changes

Analyze the changes in the system.

By using Diagram show the new process.

Implementation to the system.

2.3 Version Control

2.3.1 Description

In this section it describes about the system changes. As we, the

proponents, innovations of system in every change are in our plan.

Encountering those changes will make the project perfect in the

end.

2.3.2 Increasing Version number – Back up existing file or project.

Bug Fix – Minimal system component changes

Minor Updates – Design Changes

Major Updates – Process Change

Property Management System 53

Page 54: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

2.3.3 Work product and documentation

Documentation or reports of any changes for the project

study including the date and who’s involve in changes in the

project.

2.4 Configuration Status Accounting (CSA)

There are two ways to communicate the developer two know the

unexpected changes in the project.

2.4.1 Description

Verbal communication – Verbal communication between those

member or developer when reporting those changes

Mobile phone and social media network – this method of

communicating the developer is when they are not in the same

location.

2.4.2 Work Product and documentation

Report all the changes using verbal or mobile phone

Analyze by the developer the situation.

Feedback

Then documentation of changes.

3.3 Software Quality Assurance Plan

Table of contents

1.0 Introduction 1.1 Scope And Intent of SQA Activities1.2 SQA Organization Role

2.0 SQA Task

Property Management System 54

Page 55: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

2.1 Task Over view

2.2 Standard, Practices and conventions (SPC)

3.0 Review and Audit

3.1Generic Review Guidelines

3.1.1 Conducting a review

3.1.2 Roles and Responsibilities

3.1.3 Review work and product3.2 SQA AUDITS

4.0 Problem Reporting and Corrective Action/follow-up.

4.1 Reporting mechanism4.2 Responsibilities 4.3 Data Collection and Valuation.

1.0 Introduction In this section will discuss the Software Quality Assurance Plan

(SQA) for the Property Management System (PMS)

SQA is about the activities and issue to perform the development

process on time with the right process and more useful to the client.

The SQA Plan by the developing team will lead the group for better

and more comprehensive develop Software to achieve the goal

perfectly and impress the client.

Property Management System 55

Page 56: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

1.1 Scope and Intent of SQA activities.Objectives of SQA are:

Gather all information

Software documentation

Multi System testing.

Process refining.

1.2 SQA Organization Role

We are in the small group, only 5 members. So the group decided

to use Ego-less structure.

Project manager- Ramos, Christian Joseph De Ocampo Document Specialist – Visitacion, Clarisa Llego System Analyst – Amacio, Chanie De Guzman Business Analyst – Bacay, Kenneth Ramos Lead programmer- Arizapa, Michelle Quintela

Property Management System 56

Document Specialize – Document all the information

Business Analyst – Gather all the important information

Ego – Less Structure

Lead programmer- testing and debuging

System Analyst –analyze the process of system

Project manager- Monitor the group

Page 57: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Small group advantage and disadvantage:

Advantages Easy to communicate among the group member because of

minimal member

Project manager can monitor all the works of the member

Disadvantages

Too many task or role for each group member. For example

System analyst he/she also the designer and process analyst of the

system.

Lack of funds

This statement shows the cost of correcting an error.

Initialization and Design: In counter errors (high)

Coding and Development process: in counter errors (moderate)

System client Test and Field Operation: in counter errors (zero possibilities)

If SQA plan is executed perfectly it will lessen the group errors or

much better if the system had free for any errors. In the First step

the errors that the group in counter is high it is reasonable but it will

lessen during the second step of the process and the last step

definitely the system is free from error.

2.0 SQA TasksTask for the SQA

Interview to the possible client

Property Management System 57

Page 58: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Meetings and brainstorming of group ideas.

2.1 Task Over view The task for the SQA describe above is the objective of group

needed to perform in order to save time, cost and design,

minimizing the errors in the system.

2.2 Standard, Practices and conventions (SPC)

Interview to the possible client

Interview to the possible client meaning to say. Gather information

to the organization with the same process as your project to get

there process and featured.

In the interview will discuss the process ,problem and added

featured of their system

Organization Date Time Discussion/subject

Matrix Agency July 28 2014 8am to 12pm -Company Process

-Gather Project

information

Marban Agency July 28 2014 1pm to 5pm Company Process

-Gather Project

information

Meeting and combine group ideas.

Property Management System 58

Page 59: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Giving your own opinion or idea to the project help the project from

less in the upcoming errors. Identify or combine those ideas to

know the best for the project.

3.0 Review and Audit

Formal technical review (FTR) is software quality assurance activity. The object of FTR is the following.

Preventing errors of identify before its coming.

Verification of system that meets the requirement.

Making the propose system manageable

3.1 Generic Review Guidelines3.1.1 Conducting a review

Team review, refining the propose system

Reviews of advisors helps a lot the team developer to have a

better ideas and conclusion to the project system

Checking of Client or the system user

3.1.2 Roles and Responsibilities As I started in 1.2 SQA Organization Role.

Project manager- Monitor the group: Ramos, Christian Joseph De Ocampo

Document Specialize – Document all the information

Visitacion, Clarisa Llego System Analyst – analyze the process of system

Amacio, Chanie De Guzman Business Analyst – Gather all the important information

Bacay, Kenneth Ramos Lead programmer- testing and debugging Arizapa,

Michelle Quintela

Property Management System 59

Page 60: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

3.1.3 Review work and product Every meeting the project manager assign a task to each

member

Detailed report for each member.

Planning for the system development

3.2 SQA AUDITS Team member need to comply all the task that the Project

manager give to them

Members reports of weekly task must be know by the Project

manager.

Changes in the plan must be know by all the member of the

group

4.0 Problem Reporting and Corrective Action/follow-up. In this section will discuss how to fix up coming problem that the

team may in counter

4.1 Reporting mechanism Verbal reporting personally in the project manager or by the use

of online Social network and mobile phone then analyze and

process new ideas.

4.2 Responsibilities Team Members:

Project manager-Ramos, Christian Joseph De Ocampo

Property Management System 60

Page 61: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Document Specialist –Visitacion, Clarisa Llego System Analyst –Amacio, Chanie De Guzman Business Analyst – Bacay, Kenneth Ramos Lead programmer – Arizapa, Michelle Quintela

4.3 Data Collection and Valuation. Group meeting about how to gathered information.

Research in the internet

Conduct interview

Ask in the project adviser

1.0 Introduction

This section gives a general overview of the Property Management

System (PMS)

1.1 Goals and ObjectivesThe proponents will develop a Computerized Property

Management System which is easy to manage or access by the

system user. Buttons and combo box are in the propose system to

avoid the data redundancies in mistyping. Tables and list of

property shown in the propose system to find all the needed

information of the user. Using database makes the file more

secured, easy to retrieve all the information of property when user

needed. It also have a monitoring process to detailed all the

information of each property and also the propose system can also

generate reports and provide printed output of report.

1.2 System Statement of Scope

Property Management System 61

Page 62: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

The general statement of the intent of the software (system)

should be provided here. What information is proposed, what major

functions are implemented, and what data are provided as input to

property management

1.2.1 General Requirements

The following statements will discuss the features and

requirements of the proposed system, Property Management

System (PMS).

The propose system should have database to save the

files

The propose system should monitor the status of

property

The propose system should record the user of property

The propose system should remind or notify if there’s a n

up coming due date or payments related in the property

management

The propose system should generate a purchase order

request

The propose system should categorize the report needed

base of the user need.

Interface Enhancements – The project team create a simple but

functional design to make the system is easy to handle or to use by

the user but still all the process needed are in the system.

1.3 System Context

Property Management System 62

Page 63: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

The proposed system of the proponents is still in developing stage to make sure

that the system is free from errors and that is capable to do all the process

require by the committee. Also, the proposed system is for academic purposes

only.

1.4 Major Constraints

Time The proponents only have 4 months to finish the project so the project

team will avoid un-necessaries use of time.

Funding

Having enough funds for the development of the proposed system

is clearly one of the major constraints. Insufficiency of funds could affect

the system and to the proponents’ to continue.

Man power

Each of the proponents has their own task throughout the

development of the system. Considering that there are only five members

in the team, completion of tasks may be not a hundred percent for some

reasons like tardiness, unwanted situations or sickness.

2.0 Functional Data Description

This section will discuss overall system function and the information

domain in which it operates.

2.1 System Architecture

2.1.1 Architecture Model

Property Management System 63

Page 64: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

2.1.2 Subsystem Overview

Consumables FormThis form shows the list of item in the warehouse

database. The transaction of this form is to take item and

print the verification letter.

Dispose Form

Dispose form shows the status of a property. Dispose

is divided into two categories one is Junk and another is

Property Management System 64

Page 65: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

selling the user update the property status and depend on

the user choice the action of system

Report

Report form shows the transaction of Property

Management System (PMS). Report categorize by the user

so it means the output of reports is base on the user choice.

2.2 Data Description

2.2.1 Major Data Objects

Item information

F-item code

F- Item name

F- Category

F- Description

F- Purpose

F- Quantity

F- Date

System User information

F-User id

F-User name

F- User position

Property Management System 65

Page 66: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Human Resources Information

F- HR id number

F- HR Name

F- HR Position

Purchase Order Request

F-item code

F- Item name

F- Category

F- Description

F- Purpose

F- Quantity

F- Date

F- Prepared by

F- Approve by

Consumables

F-item code

F- Item name

F- Category

F- Description

Property Management System 66

Page 67: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

F- Purpose

F- Quantity

F- Date

F- Prepared by

F- Approve by

F- Taken by

2.2.2 Relationship

2.3 Human Interface DescriptionLog in Screen - security access for the system. Admin and

user have different form

Property Management System 67

Page 68: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Personnel Home Screen – Personnel home screen show

the information of current personnel user. The function or the

process that can make this form is minimal.

Admin Home Screen- The administrator home screen show

the different function on the system. in linked to another

process and show all the information needed by the

administrator

Main process- Main process shows the different

functionality on project proposal. It linked to another

transaction or process

Property Maintenance - view all the property in categorizes

order. Also update the status or information of the property

Notification – notification show the due date of payment.

Reminder for needed to pay property. Transaction will send

to the Accounts payables for paying.

Add new property or rent adding data or information to the

database. The required property to add is the item without

purchase order this form also can add information about

rental property.

Dispose – changing the status to dispose. Dispose form

shows the status of a property. Dispose is divided into two

categories one is Junk and another is selling the user update

the property status and depend on the user choice the action

of system. The transaction was reported to General Ledger.

Consumables – form shows the list of item in the

warehouse database. The transaction of this form is to take

item and print the verification letter.

Property Management System 68

Page 69: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Request item – the information of needed item to buy.

Transaction of this form will send the information to the

procurement system. The transaction can be printed

Reports- Report form shows the transaction of Property

Management System (PMS). Report categorize by the user

so it means the output of reports is base on the user choice.

Property Management System 69

Page 70: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

3.0 Subsystem Description

3.1 Subsystem flow diagram

3.1.1 Consumables

Property Management System 70

Page 71: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

3.1.2 Disposal

3.1.3 Requested item

Property Management System 71

Page 72: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

4.0 Enhanced Interface prototyping

4.1 Prototyping

The following are the proposed interfaced for the Property

Management System:

Login form

Property Management System 72

Page 73: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Main Process

Add new property

Property Management System 73

Page 74: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Property Management System 74

Page 75: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Notification form

Request Item

Property Management System 75

Page 76: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Property maintenance

1.1 Goals and Objectives

The proponents will develop a Computerized Property

Management System which is easy to manage or access by

the system user. Buttons and combo box are in the propose

system to avoid the data redundancies in mistyping. Tables

and list of property shown in the propose system to find all

the needed information of the user. Using database makes

the file more secured, easy to retrieve all the information of

property when user needed. It also have a monitoring

process to detailed all the information of each property and

also the propose system can also generate reports and

provide printed output of report.

1.2 System Statement of Scope

Property Management System 76

Page 77: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

The general statement of the intent of the software (system)

should be provided here. What information is proposed, what major

functions are implemented, and what data are provided as input to

property management

1.2.1 General Requirements

The following statements will discuss the features and

requirements of the proposed system, Property Management

System (PMS).

The propose system should have database to save the

files

The propose system should monitor the status of

property

The propose system should record the user of property

The propose system should remind or notify if there’s a n

up coming due date or payments related in the property

management

The propose system should generate a purchase order

request

The propose system should categorize the report needed

base of the user need.

Interface Enhancements – The project team create a simple but

functional design to make the system is easy to handle or to use by

the user but still all the process needed are in the system.

1.1.3 Extended Enhancement

Online integration – the proponent tackled the issue of using online integration. The transaction in wireless connection is fast and reliable.

Property Management System 77

Page 78: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

1.3 System Context

The proposed system of the proponents is still in developing stage to make sure

that the system is free from errors and that is capable to do all the process

require by the committee. Also, the proposed system is for academic purposes

only.

1.4 Major Constraints

Time The proponents only have 4 months to finish the project so the project

team will avoid un-necessaries use of time.

Funding

Having enough funds for the development of the proposed system

is clearly one of the major constraints. Insufficiency of funds could affect

the system and to the proponents’ to continue.

Man power

Each of the proponents has their own task throughout the development of the

system. Considering that there are only five members in the team, completion of

tasks may be not a hundred percent for some reasons like tardiness, unwanted

situations or sickness.

2.0 Usage scenario

Property Management System 78

Page 79: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

2.1 User Profile

There will be two levels of users:

Full control (Administrator)

Read/write/modify all (personnel)

2.2 Use Cases

Read/Write/Modify All Users

This level of users can add, remove and update data from

the system

Full Control Users

The administrative level has the full access in the system

and its setting. This level of users controls any process of the

system and has a right to add or remove users.

3.0Data Description

3.1Data Description

3.1.1 Data Object and Dictionary

Item information

F-item code

F- Item name

Property Management System 79

Page 80: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

F- Category

F- Description

F- Purpose

F- Quantity

F- Date

System User information

F-User id

F-User name

F- User position

Human Resources Information

F- HR id number

F- HR Name

F- HR Position

Purchase Order Request

F-item code

F- Item name

F- Category

F- Description

Property Management System 80

Page 81: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

F- Purpose

F- Quantity

F- Date

F- Prepared by

F- Approve by

Consumables

F-item code

F- Item name

F- Category

F- Description

F- Purpose

F- Quantity

F- Date

F- Prepared by

F- Approve by

F- Taken by

3.1.2 Relationships

Property Management System 81

Page 82: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

4.0 Functional Model and Description

4.1 Subsystem Flow Diagrams

Property Management System 82

Page 83: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

4.1.1 Consumables

4.1.2 Disposal

Property Management System 83

Page 84: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

4.1.3 Requested item

Property Management System 84

Page 85: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

4.2 Human Interface Description

Property Management System 85

Page 86: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Log in Screen - security access for the system. Admin and

user have different form

Personnel Home Screen – Personnel home screen show

the information of current personnel user. The function or the

process that can make this form is minimal.

Admin Home Screen- The administrator home screen show

the different function on the system. in linked to another

process and show all the information needed by the

administrator

Main process- Main process shows the different

functionality on project proposal. It linked to another transaction or

process

Property Maintenance - view all the property in categorizes

order. Also update the status or information of the property

Notification – notification show the due date of payment.

Reminder for needed to pay property. Transaction will send to the

Accounts payables for paying.

Add new property or rent adding data or information to the

database. The required property to add is the item without

purchase order this form also can add information about rental

property.

Dispose – changing the status to dispose. Dispose form shows the

status of a property. Dispose is divided into two categories one is

Junk and another is selling the user update the property status and

depend on the user choice the action of system. the transaction wa

reported to General Ledger.

Property Management System 86

Page 87: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Consumables – form shows the list of item in the warehouse database.

The transaction of this form is to take item and print the verification letter.

Request item – the information of needed item to buy.

Transaction of this form will send the information to the

procurement system. The transaction can be printed

Reports- Report form shows the transaction of Property Management System

(PMS). Report categorize by the user so it means the output of reports is base on

the user choice.

5.0 Restrictions, Limitations and ConstraintsTime

The proponents only have 4 months to finish the project so the project

team will avoid un-necessaries use of time.

Funding

Having enough funds for the development of the proposed system

is clearly one of the major constraints. Insufficiency of funds could affect

the system and to the proponents’ to continue.

Man power

Each of the proponents has their own task throughout the

development of the system. Considering that there are only five members

in the team, completion of tasks may be not a hundred percent for some

reasons like tardiness, unwanted situations or sickness.

Property Management System 87

Page 88: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

6.0 Validation Criteria

The proponents validate information by testing the system and

database. Connection of database to system is the first checking. Access

of system to the database we use a pop up message that show the status

of connection of system to the database. The pop up message show

message depend if the connection successful or not. But if the connection

was field it show the errors and where the errors to configure it or debug

the codes and solve the problem.

The proponent validate also if the data from system is successfully

save to the database. Again the proponent use pop up message to locate

the error or show positive result. To clarify or make sure the data was

saved the proponent use table that show the whole information of

database for the user viewing

If there’s a saving process there also a update and modify process

to know the validation the proponent also use the technique in saving data

from database.

2.0Introduction

This section gives a general overview of the Property Management

System (PMS)

2.1 Goals and ObjectivesThe proponents will develop a Computerized Property

Management System which is easy to manage or access by the

system user. Buttons and combo box are in the propose system to

avoid the data redundancies in mistyping. Tables and list of

Property Management System 88

Page 89: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

property shown in the propose system to find all the needed

information of the user. Using database makes the file more

secured, easy to retrieve all the information of property when user

needed. It also have a monitoring process to detailed all the

information of each property and also the propose system can also

generate reports and provide printed output of report.

1.2 System Statement of Scope

The general statement of the intent of the software (system)

should be provided here. What information is proposed, what major

functions are implemented, and what data are provided as input to

property management

1.2.1 General Requirements

The following statements will discuss the features and

requirements of the proposed system, Property Management

System (PMS).

The propose system should have database to save the

files

The propose system should monitor the status of

property

The propose system should record the user of property

The propose system should remind or notify if there’s a n

up coming due date or payments related in the property

management

The propose system should generate a purchase order

request

The propose system should categorize the report needed

base of the user need.

Property Management System 89

Page 90: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Interface Enhancements – The project team create a simple but

functional design to make the system is easy to handle or to use by

the user but still all the process needed are in the system.

1.3 System Context

The proposed system of the proponents is still in developing stage to make sure

that the system is free from errors and that is capable to do all the process

require by the committee. Also, the proposed system is for academic purposes

only.

1.4 Major Constraints

Time The proponents only have 4 months to finish the project so the project

team will avoid un-necessaries use of time.

Funding

Having enough funds for the development of the proposed system

is clearly one of the major constraints. Insufficiency of funds could affect

the system and to the proponents’ to continue.

Man power

Each of the proponents has their own task throughout the

development of the system. Considering that there are only five members

in the team, completion of tasks may be not a hundred percent for some

reasons like tardiness, unwanted situations or sickness.

2.0 Data Design

2.1Database Description

Property Management System 90

Page 91: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

3.0 Architectural and Component- Level Design

3.1 Program Structure

3.1.1 Overall

Property Management System 91

Page 92: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Menu ItemsThe following shows the architecture of the main menu:

3.1.2 Add new

Property Management System 92

Page 93: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

3.1.3 Property maintenance

3.1.4 Notification

Property Management System 93

Page 94: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Description for Components

3.2.1 Log in

Major Form: Log in

Major Action: confirm,userlogin and user password

UserLogin

Object Name:TextfieldLog

UserPassword

Object Name:TextfieldLog

Property Management System 94

Page 95: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Confirm

Object name: btnConfirm

Verify information from login and pass fields

3.2.2 Main Process

Major Form: Main form

Major Action: linkbuttons

Add new

Object name: btnadd

The purpose of this button is to link the main home to another process

which is Add new form. Add new is form when you going to save new

data from system to database

Property maintenance

Object name: btnmain

The purpose of this button is to link the main home to another process

which is Property maintenance form. Property maintenance are one of

the major process of the system. Status of property from database

show on the system

Notification

Object name: btnNotif

The purpose of this button is to link the main home to another process

which is Notification form. In this form show all the information of due

date payables. This form also can send the information to the account

payables system

Consumables

Object name: btnCon

The purpose of this button is to link the main home to another process

which is Consumables form. Show the information in the database the

Property Management System 95

Page 96: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

property info and their quantity also it shown up the information oh HR

needed that item

Dispose

Object name: btnDis

The purpose of this button is to link the main home to another process

which is Dispose Form. In this form allow to manage the property if that

property for selling of junk the letter will send to the General ledger

system

3.2.3 Add new

Major Form: Add new form

Major Action: Save

Save

Object name:btnSave

The purpose of this button is to save all the information to the

database

3.2.4 Property maintenance

Major Form: Property form

Major Action: save,modify and send.

Save

Object name:btnSave

The purpose of this button is to save all the information to the

database

Modify

Object name:btnmod

Property Management System 96

Page 97: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

The purpose of this button is to update the information of

property

3.2.5 Notification

Major Form: NotificationMajor Action: table save and sent.

Save

Object name:btnSave

The purpose of this button is to save all the information to the

database

Send

Object name:btnSave

The purpose of this button is to send all the information

Table

Object name: TTable

The purpose of this button is to show all the information to the

database

3.2.6 ConsumablesMajor Form: Consumables

Major Action: find, show modify save and print

Save

Property Management System 97

Page 98: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Object name:btnSave

The purpose of this button is to save all the information to the

database

Modify

Object name:btnmod

The purpose of this button is to update the information of

property

3.2.7 DisposeMajor Form: DisposeMajor Action: show modify save sent

Save

Object name:btnSave

The purpose of this button is to save all the information to the

database

Modify

Object name:btnmod

The purpose of this button is to update the information of

property

Send

Object name:btnSave

The purpose of this button is to send all the information

Table

Object name: TTable

The purpose of this button is to show all the information to the

database

Property Management System 98

Page 99: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

4.0 User Interface DesignThe propose system compose of many transitions of form

connected depend on the usage of system. each of form analyze and design

perfectly by the proponent to make sure the system will be useful to the client

4.1 Description of the User Interface

Below are some of the forms in the program. After fire

up the program, the login screen will appear. If the users

enter the right username with the matching password, it will

immediately take them to the main interface.

4.1.2 Objects and Actions1. Login Form

Username

Username can be ranged from 6-20 letters or

numbers, as the industry standards. No special

characters and space.

Password

Password can be ranged from 6-20 letters and

numbers, as the industry standard. No special characters

and spaces.

Cancel Button

This button allows the user to exit into the system if

they wish to end transaction.

4.2 Interface Design Rules

Property Management System 99

Page 100: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Interface design focuses on three areas of concern:

1. The design of interfaces between software modules;

2. The design of interfaces between the software and other nonhuman

producers and consumers of information

3. The design of the interface a human and the computer

4. Easy to learn

5. Readability

6. Easy to navigate between interfaces

4.3 Components AvailableThe proponents are required to use the Java Programming

Language. For that matter, it is decided that the proponents will be using

Java Netbeans. So here is the following list of controls that the

proponents will be using for the PMS.

4.3.1Java Swing Controls

JTextField

JLabel

JButton

JPanel

JFrame

JPasswordField

Etc.

4.3.2 Java Swing Menus Menu Bar

Menu Item

Pop-up Menu

Etc.

4.3.3 Java Swing Container JPanel

Toolbar

Property Management System 100

Page 101: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

5.0 Restriction, Limitation and Constraints

Time

Time is so far the biggest restriction or constraints for the proponents

to developed the proposed system. The proponents only have an

approximately five months to finish the entire project. It is very important

for the proponents to watch the time to spend over the phase of the

software development project. The proponents could have included many

components to the project like online HRMS but time restricts the project

team from doing so.

Employee Skills

Skills in computer programming and design skills are also one of

the restrictions. It does not have as big of an impact on the project as time

but it sure does limit the proponents from doing more addition to the

project functions and components.

6.0 Testing IssueTo validate the system we need to test it with another process.

During the testing of connection, the project team concerned about the

data from another process must be correct. Getting wrong data from other

process make the project system did not work properly.

Property Management System 101

Page 102: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

6.1 Classes of test

System Interface

The proponents will create an interface easy to operate and

understand design must be compose of tables, buttons, text field

pictures and menus.

The proposed system is basically made up of major

components that the proponents are required to do so. It will use

Java Netbeans for front-end and MS SQL for back-end.

Login FormStart of the process, in this form categorized the user of the

system, Login name and password Field must have correct

information to proceed to the next process based on the level user

Admin formAdmin form shows the function that the admin of company

can do this Form link to many processes of system, main function

purchase order request, reports and management personnel.

Personnel FormThis form shows the information of the user, it also link to

another process, but the personnel has a limited action to the

project system.

Main FunctionMain Function is the main process of project, in this form

shows the request from another process, this form connected to

another transaction. Main function is home form of all transaction

Property Management System 102

Page 103: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

ConsumablesIn this form, it shows the request item of Human Resource. It

also shows the item in warehouse. This form is the main

transaction of project.

Notification

Notification form shows all the reminders for payment it can

be yearly, monthly or weekly notification about the thing needed to pay for

example of this is the renewal of license gun and vehicle. The proposal project

automatical show all the needed reminders about the property.

Purchase Order RequestThis form is also the main process. Purchase Order Request

form is a letter for needed item need to buy and send it to

procurement process this process only manage by the admin.

ReportsReport form is the list of transaction of property management

it can generate needed reports and can only manage by the admin

only.

Black Box Testing:

This is also known as Behavioral Testing, is software testing method in

which the internal structure/design/implementation of the item being tested is not

known to the tester. These tests can be functional or non-functional, though

usually functional.

This method of attempts to find errors in the following categories:

Incorrect or missing functions

Interface errors

Property Management System 103

Page 104: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Errors in data structures or external database access

Behavior or performance errors

Initialization and termination errors

6.2 Performance Bounds

The proponents have to setup a certain performance bounds or

criteria for the PMS so that by following those criteria, the proponents will

be able to maintain quality, user friendliness and usability of the software.

LoginThe user should be able to log on within 0.1 second

Save FunctionBest Case Scenario – Immediate

Worst Case Scenario – 3 seconds

Search FunctionBest Case Scenario – Immediate

Worst Case Scenario – 3 seconds

Print FunctionBest Case Scenario – Immediate

Worst Case Scenario – 2 seconds

Browse FunctionBest Case Scenario – Immediate

Worst Case Scenario – 2 seconds

Delete FunctionBest Case Scenario – Immediate

Property Management System 104

Page 105: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Worst Case Scenario – 3 seconds

Exit FunctionBest Case Scenario – Immediate

Worst Case Scenario – 3 seconds

Cancel FunctionBest Case Scenario – Immediate

Worst Case Scenario – 2 seconds

6.3 Identification of Critical Components

User Access

The proponents will make sure that the accessibility of the system

is limited if only if the person is an authorized user for the system.

Print Generator

Making sure that the reports that can be generated into print-outs is

correct. The reports should generate right amount of data and can be

accessed in different type of document formats.

1.0 IntroductionThis section gives a general overview of the test Specification for the

Property Management System (PMS).

1.1 Goals and Objectives

The objective of the PMS is to provide the user an easy and

convenient way to access their data and generate useful reports.

The goal of the proponents is to do the right thing, though

perfection is what everyone wants but to do the right thing for a

purpose is more powerful than anything.

Property Management System 105

Page 106: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Many constraints will be applied to the system. The testing

process for PMS has a number of goals and will be thoroughly

tested for logic errors and coding bugs. In addition to testing bugs,

PMS will also test the friendliness of the user interface to ensure

that it is of the utmost quality: efficient, powerful, and user-friendly.

1.2 Statement of Scope

An overall plan for integration of the software and a

description of specific tests are documented in this section. Below

are the different kinds of tests that the team will take to ensure the

quality of the software.

1. Unit Testing- MS SQL Database

- PC Application

- Java Net Beans

Unit test will be performed using black box testing methods.

2. Integration Testing- MS SQL Database

- PC Application

- Java Net Beans

3. Validation Testing- MS SQL Database

- PMS

- PC Application

4. High-order Testing

Property Management System 106

Page 107: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

- MS SQL Database

- PMS

- PC Application

1.3 Major Constraints

In this section the proponents discussed the related constraints that

can affect the testing.

1. The proponents has limited time to meet the clients for testing

purposes

2. The proponents may encounter insufficiencies of funds

3. The proponents only got five members in a group.

2.0 Testing PlanThe proponents want the HRMS to be bug five and lesser error on

the processes. The proponents also want to make sure that there are no

defects in the system. This is the reason why the proponents have to

spend large amount of the total software development time on the testing.

The following are the description of the testing procedure and strategy.

The proponents also be presenting the timing and scheduled of the tests

to be carried out.

2.1 Software (SCIs) to be tested

2.1.1 Interfaces

Login form

For login project team set a restriction for login. Developer use

button in checking of verification of user

Property Management System 107

Page 108: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Menus

Menu bar (all process)

Help – tips or information about the process using buttons to view

Sign out – function of this button log out the user and back to the

log in process

Request Item

Generate letter – by clicking this button it will show a table where

you can put your data on.

Save – the function of this button is to save the letter into the

database

Send – send the letter to the procurement to process.

Reports

Generate report – by click this button the user can choose the

report he/she wants to view and print it.

Add new

Add – using this button you can add the item from warehouse table

to request item table

Remove - using this button you can remove the item from request

item table to warehouse table

View – view the transaction and save it.

Consumables

Find – using this function to find the Hr information.

Add – this function is for adding the order uniform to the HR

database

Print verification – print the verification and sent data information to

the warehouse.

Property Management System 108

Page 109: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Property maintenance

Repair – this button change the status of property to repair.

Lost / un use – this button change the status of property to repair

Change – this button change the status of property to repair

2.2 Testing Strategy

In the following section, the proponents will describe the testing

strategy and will use four different methods to test the proposed system

2.2.1 Unit Testing

This type of testing is performed by the developers before

the setup is handed over to the testing team to formally execute the

test cases. Unit testing is performed by the respective developers

on the individual units of source code assigned areas. The

developers use test data that is separate from the test data of the

quality assurance team.

The goal of unit testing is to isolate each part of the program

and show that individual parts are correct in terms of requirements

and functionality.

2.2.2 Integration Testing

The testing of combined parts of an application to determine

if they function correctly together is Integration testing. There are

two methods of doing Integration Testing Bottom-up Integration

testing and Top down Integration testing.

Property Management System 109

Page 110: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

After all individual modules have been unit tested, and are properly

functioning, they will be put together to form a program. This

program will then be tested for general errors including compiler

and runtime errors, input errors, and efficiency. Any errors will be

corrected at this stage. If the program is inefficient in some

computation, the cause of the inefficiency will be isolated and fixed,

whether it be at the unit level or the integration level.

2.2.3 Validation Testing

As the program is starting to take shape, lead programmers

will make sure it adheres to customer guidelines. If any guideline

cannot be followed exactly, then the program will be modified to suit

the nearest reasonable alternative.

2.2.4 High-order Testing

PMS will be system tested to ensure that all programming

packages integrate with each other as intended, and that the final

software is integrated well into the native environment.

Alpha testing will follow, where the software interface will be

delivered to a few people to test. The alpha testers will use the

software as it was intended, to make sure no problems exist. Here

any issues with the interface, computation, or graphs will be fixed.

The software will then be tested for security and performance.

During security testing, we will attempt to run known exploits

against the interface and test security of the software. Security is

Property Management System 110

Page 111: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

vital to a user interface, so as to keep user data confidential, and so

any security issues will be given special attention. During

performance testing we will test the runtime performance of the

software and make sure that the interface performs well in a variety

of conditions.

2.3 Testing Resources and Staffing

The proponents will use several different resources to

carry out the test on the HRMS. Since the time is a part of project

constraint, the proponents will try to use help from everyone that is

essential to take the responsibility and evaluate the software during

the testing phase.

- The Company Staff

- The Proponents

- Laptop / Desktop

- Software Applications

2.4 Test Record Keeping

Test record keeping and test work products are described in

section 3.4 of the test specification document. For more information

regarding these topics, please refer to section 3.4 of the Test

specification Document.

2.5 Testing tools and Environment

Java Netbeans will be used as testing tools as well as the testing

environment. As stated above, a test date will be constructed for unit and

integration testing.

Property Management System 111

Page 112: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

2.6 Test Schedule

Following is the tentative schedule for the testing of the PMS.

Project Test Plan

- To be scheduled

System Testing

- To be scheduled

Generating the test reports

- To be scheduled

System Implementation

- To be scheduled

3.0 Test Procedure

In this section the proponents will describe the test procedures in detail.

3.1 Software (SCIs) to be tested

For detailed list of the software component items please refer to

section 2.1 from Test Specification document.

3.2 Testing Procedure

Property Management System 112

Page 113: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

In this section the proponents will try to describe overall software

specification and describe the methods for the different test to be

performed and will also declare the expected outputs.

Login form

For login project team set a restriction for login. Developer use button in

checking of verification of user

Menus

Menu bar (all process)

Help – tips or information about the process using buttons to view

Sign out – function of this button log out the user and back to the

log in process

Item request

Generate letter – by clicking this button it will show a table where

you can put your data on.

Save – the function of this button is to save the letter into the

database

Send – send the letter to the procurement to process.

Reports

Generate report – by click this button the user can choose the

report he/she wants to view and print it.

Add new

Add – using this button you can add the item from warehouse table

to request item table

Remove - using this button you can remove the item from request

item table to warehouse table

View – view the transaction and save it.

Property Management System 113

Page 114: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

3.2.1 Unit Testing

 3.2.1 Unit test cases

 3.2.1.1 Login

Test Case Input Expected ResultValid Login Valid Username &

Password

Logged in to user

interface

Invalid Login Invalid Username

& Password

Refresh login page

and prompt for

valid credentials

3.2.1.2 Logout

Test Case Input Expected Result

Logout User clicks logout Prompt “Are you

sure you want to

logout?”

3.2.1.3 Help

Test Case Input Expected Result

Select topic User selects a

topic

Display topic

contents

3.2.1.4 Report

Test Case Input Expected Result

Specify function Function, variables,

data

Function is

generated

according to inputs

Property Management System 114

Page 115: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Specify invalid

function

Invalid function,

and/or variables,

and/or data

Prompt ‘Function

could not be

generated due to

invalid inputs’

Graph Type of graph Graph is displayed

Invalid Graph Prompt ‘Graph

cannot be

displayed’

3.2.2 Integration Testing

Test Case Input Expected Result

Valid Login Valid Username &

Password

Logged in to user

interface; taken to

main page, cookie

enabled.

Invalid Login Invalid Username

& Password

Refresh login page

and prompt for

valid credentials

Select help topic Help topic Display topic

contents

Begin Report Click ‘New Report’ Function page is

displayed

Specify function Function,

variables, data

Function is

generated

according to inputs

Specify invalid

function

Invalid function,

and/or variables,

and/or data

Prompt ‘Function

could not be

generated due to

invalid inputs’

Graph Type of graph, Graph is displayed

Property Management System 115

Page 116: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

data generated

from function

Invalid Graph Prompt ‘Graph

cannot be

displayed’

Request Account Username which is

already taken

Prompt “Choose

another username”

Request Account Password shorter

than specified

length

Prompt “Password

too short”

Request Account Unique username,

and valid password

Account created

Logout User clicks logout Prompt “Are you

sure you want to

logout?”

Links Correct Click on each and

every link

Link goes to proper

location

3.2.3 Validation Testing

Functionality

Test Case

Input Expected Result

Login Valid

Login

Valid

Username

& Password

Logged in to

user interface;

taken to main

page, cookie

enabled.

Invalid

Login

Invalid

Username

& Password

Refresh login

page and

prompt for valid

credentials

Property Management System 116

Page 117: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Help Select

help

topic

Help topic Display topic

contents

Report Begin

Report

Click ‘New

Report’

Function page

is displayed

Specify

function

Function,

variables,

data

Function is

generated

according to

inputs

Specify

invalid

function

Invalid

function,

and/or

variables,

and/or data

Prompt

‘Function could

not be

generated due

to invalid

inputs’

Output Graph Type of

graph, data

generated

from

function

Graph is

displayed

Invalid

Graph

Prompt ‘Graph

cannot be

displayed’

Account

Request

Request

Account

Username

which is

already

taken

Prompt

“Choose

another

username”

Request

Account

Password

shorter than

specified

length

Prompt

“Password too

short”

Property Management System 117

Page 118: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Request

Account

Unique

username,

and valid

password

Account

created

Logout Logout User clicks

logout

Prompt “Are

you sure you

want to

logout?”

3.2.4 High Order Testing

The high-order testing procedure is specified. For each of the high

order tests specified below, the test procedure, test cases, purpose,

specialized requirements and pass/fail criteria are specified. It

should be noted that not all high-order test methods noted in

Sections 3.2.4.n will be conducted for every project.

 3.2.4.1 Recovery testing

No recovery testing will be required. Since all the data are

accessed using a web browser, in the event of a system crash,

the user can always reboot their computer and log in to the

website again and reload everything.

 3.2.4.2 Security testing

Security will be tested thoroughly. Only registered and

authorized users should be allowed access to use the analysis

functions provided by PMS

 3.2.4.3 Stress testing

Property Management System 118

Page 119: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Different sizes of data will be tested. Amount of user flow will

also be tested. The PMS should be able to allow a reasonable

amount of user to use the website at the same time without

causing any traffic and loading speed of the website.

 3.2.4.4 Performance testing

A timer will be set for each report generated. These times will be

recorded and studied to see if the software is sufficient enough

to handle all types of reports the users might request on

different size of data.

 3.2.4.5 Alpha/beta testing

Alpha testing will be based on the software developers.

Members of the team will each go through the website

thoroughly and use the analysis functions on a testing database

to ensure quality and correctness.

Beta testing will be public. Selected pre-registered users will be

given a username and password and their data will be loaded to

the database. They will each go through the website and submit

a report of any bugs, ease of use, and as well as their opinions

about the PMS.

 3.2.4.6 Pass/fail criterion for all validation tests

If there are many complaints and errors of the website, it will not pass

the test.

3.3 Testing Resources and Staffing

Property Management System 119

Page 120: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

The proponents have a limited manpower to be able to test the

HRMS properly. This is the reason why the proponents will use

help from several different people to be able to tests the

functionalities of the HRMS. The following are the people that

involves in this task.

1. Client Staff / EmployeesThe proponents ask for help to test the PMS with the

participation of the security agency personnel. The employees /

staff are allowed to use the full function of the PMS as part of its

validation testing. The employee tries to add the aspiring

applicant and then be able to save the info of the employee. The

employees are allowed to record any errors that they encounter

during the software testing on hand.

2. Handheld PC / Desktop / LaptopThe proponents will have to use the clients PC or laptops after

installing the HRMS. This will allow the user / employee to test

the HRMS with one or more tester at the same time. With this,

the data from one computer to the other are also identified

through the system integration functionalities of PMS.

3. Error ReportingThe proponents provide a reports manual on which the

employee and staff are required to list down the error and bugs

that they may encounter during the testing activity.

3.4 Test Record Keeping and Log

A test record keeping document will be used to evaluate immediate test

result for each of the testing. For example:

Property Management System 120

Page 121: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Test Record Form

Test Type :____________

Tester :____________

Date :____________

Test Case Test Report Enhancement

Report

Comments

Valid Login

Invalid Login

Select help

topic

Begin Report

Specify function

Specify invalid

function

Graph

Invalid Graph

Request

Account1

Request

Account2

Request

Account3

Logout

Links correct

A test log will be kept to monitor the tests that have been applied. An

error, or “bug” log is kept to monitor any problems that have arisen during

testing.

Property Management System 121

Page 122: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Test Log

Date Defect report Test Type Test Case Result Comments

Property Management System 122

Page 123: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Property Management System 123

Page 124: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Property Management System 124

Page 125: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Property Management System 125

Page 126: it4106servicemanagementsystem.weebly.comit4106servicemanagementsystem.weebly.com/uploads/…  · Web viewCHAPTER 1. Project Charter. 1.0. Project Background. Property Management

Service Management System

Property Management System 126