8.1.1 SOUTH EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 (Figures in thousand of Rupees) Item No. RE 2014-15 1 Howrah-Amta, Bargachia-Champadanga-Tarakeshwar, Amta-Bagnan & new material modification for Janghipara-Furfura Sharif (12.3 km) Cap. 1,51,00 2 Bowaichandi-Arambagh (31 km) Cap. 1,90,00 3 Digha-Jaleswar (41 km) with new material modification for Digha-Egra (31 km) Cap. 28,00 4 Tamluk-Digha, Deshpran-Nandigram with material modification for Kanthi-Egra (26.2 km), Nandakumar-Bolaipanda (27 km) - new line & Nandigram - Kandiamari (Nayachar) (7 km) - new line Cap. 12,10,00 5# Badutola-Jhargram via Lalgarh (54 km) Cap. 2,00 TOTAL-WORKS IN PROGRESS Cap. 15,81,00 6 Works costing below Rs.2.5 crore each Cap. .. TOTAL-NEW WORKS Cap. .. TOTAL-New Lines (Construction) Cap. 15,81,00 7 Ranchi-Lohardaga with extension to Tori (113 km) Cap. 60,00,00 C.Fund .. EBR 25,00,00 8 Rupsa-Bangriposi (90 km) Cap. 6,95,00 Dep(RVN) .. EBR .. 9 Bankura - Damodar Vally (96 Km) GC with Bowai Chandi - Khana (22 km) NL, Rainagar-Masagram (20.9 km) NL, Bankura - Mukut Monipur (57 km) NL & Mukut Monipur-Uparsol (26.7 km) NL , Bankura (Kalabati)-Purulia via Hura - (65 km) NL & Mukut Monipur-Jhilim Cap. 10,00,00 C.Fund .. DRF .. TOTAL-WORKS IN PROGRESS Cap. 76,95,00 EBR 25,00,00 TOTAL-Gauge Conversion Cap. 76,95,00 EBR 25,00,00 10 Padapahar-Banspani Cap. 4,00,00 C.Fund .. 11 Rajkharswan-Chakradharpur - 3rd line (20 km) Cap. 2,11,00 12 Banspani-Jaruli (9 km) Cap. 4,55,00 C.Fund .. 13 Barbil-Barajamda (10 km) Cap. 1,85,00 C.Fund .. 14 Bimlagarh-Dumetra Cap. 3,10,00 C.Fund .. Allocation Particulars NEW LINES (CONSTRUCTION) A - Works in Progress B - New Works GAUGE CONVERSION A - Works in Progress DOUBLING A - Works in Progress

Upload: dominh

Post on 28-Aug-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

8.1.1

SOUTH EASTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE

2014-15

1 Howrah-Amta, Bargachia-Champadanga-Tarakeshwar, Amta-Bagnan & new material

modification for Janghipara-Furfura Sharif (12.3 km)

Cap. 1,51,00

2 Bowaichandi-Arambagh (31 km) Cap. 1,90,00

3 Digha-Jaleswar (41 km) with new material modification for Digha-Egra (31 km) Cap. 28,00

4 Tamluk-Digha, Deshpran-Nandigram with material modification for Kanthi-Egra (26.2

km), Nandakumar-Bolaipanda (27 km) - new line & Nandigram - Kandiamari

(Nayachar) (7 km) - new line

Cap. 12,10,00

5# Badutola-Jhargram via Lalgarh (54 km) Cap. 2,00

TOTAL-WORKS IN PROGRESS Cap. 15,81,00

6 Works costing below Rs.2.5 crore each Cap. ..

TOTAL-NEW WORKS Cap. ..

TOTAL-New Lines (Construction) Cap. 15,81,00

7 Ranchi-Lohardaga with extension to Tori (113 km) Cap. 60,00,00

C.Fund ..

EBR 25,00,00

8 Rupsa-Bangriposi (90 km) Cap. 6,95,00

Dep(RVN) ..

EBR ..

9 Bankura - Damodar Vally (96 Km) GC with Bowai Chandi - Khana (22 km) NL,

Rainagar-Masagram (20.9 km) NL, Bankura - Mukut Monipur (57 km) NL & Mukut

Monipur-Uparsol (26.7 km) NL , Bankura (Kalabati)-Purulia via Hura - (65 km) NL &

Mukut Monipur-Jhilim

Cap. 10,00,00

C.Fund ..

DRF ..

TOTAL-WORKS IN PROGRESS Cap. 76,95,00

EBR 25,00,00

TOTAL-Gauge Conversion Cap. 76,95,00

EBR 25,00,00

10 Padapahar-Banspani Cap. 4,00,00

C.Fund ..

11 Rajkharswan-Chakradharpur - 3rd line (20 km) Cap. 2,11,00

12 Banspani-Jaruli (9 km) Cap. 4,55,00

C.Fund ..

13 Barbil-Barajamda (10 km) Cap. 1,85,00

C.Fund ..

14 Bimlagarh-Dumetra Cap. 3,10,00

C.Fund ..

AllocationParticulars

NEW LINES (CONSTRUCTION)

A - Works in Progress

B - New Works

GAUGE CONVERSION

A - Works in Progress

DOUBLING

A - Works in Progress

8.1.2

SOUTH EASTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE

2014-15

AllocationParticulars

15 Rajkharsawan-Sini - 3rd line Cap. 19,34,00

C.Fund ..

16 Panskura-Kharagpur - 3rd line (44.7 km) with new material modification for Panskura-

Ghatal (32.8 km) - new line

Dep(RVN) ..

17 Rajgoda-Tamluk (13.5 km) - Phase-II of Panskura-Haldia doubling Cap. 68,00

EBR ..

18 Champajharan-Bimlagarh (21 km) Cap. 17,30,00

19 Tamluk Jn. Cabin-Basulya Sutahata (24.4 km) Cap. 15,00,00

EBR ..

20 Goelkera-Monoharpur - 3rd line (40 km) C.Fund ..

Dep(RVN) ..

EBR ..

21 Muri-North Outer Cabin/Muri - Doubling of section with provision of 2nd bridge over

Subarnarekha

Cap. 1,69,00

C.Fund ..

22 Dongaposi-Rajkharsawan - 3rd line Cap. 86,36,00

23 Tikiapara-Santragachi - 4th line (5.6 km) Dep(RVN) ..

24 Sini-Adityapur (22.5 km) - 3rd line Cap. 57,92,00

25 Kharagpur-Gokulpur via Girimaidan (6 km) Cap. 3,11,00

26 Kharagpur-Narayangarh - 3rd line (20 km) Cap. 1,01,00

27 Manoharpur-Bondamunda - 3rd line (30 km) Cap. 1,23,00

28 Andul-Baltikuri (7.25 km) Cap. 85,00

TOTAL-WORKS IN PROGRESS Cap. 220,10,00

Dep(RVN) ..

TOTAL-Doubling Cap. 220,10,00

Dep(RVN) ..

29 Santragachi - Island platform between 1st loop & R3 by dismantling R1 & R2 with

common loop signalling facility

DF(3) 1,00

30 Tatanagar & Adityapur - Yard remodelling DF(3) 1,00,00

31 Barajamda - Modification of station yard DF(3) 40,00

32 Barbil - Connecting line Nos 5 & 6 and one addl. loading line No 7 on Barajamda end

with main line

Cap. 1,06,00

33 Nimpura - Signalling facility for despatching up trains between line No.5, 6, 7, 12, 14,

15, 16, 17 & 18 of reception yard west cabin towards Adra & Tata ends

Cap. 1,35,00

EBR ..

34 Ranchi - Construction of platform No 4 & 5 DF(3) 1,71,00

35 Barbil - Development of goods shed as freight terminal DF(3) 65,00

36 Chakradharpur Division - Simultaneous reception & despatch facilities (8 stations) DF(3) 46,25

DOUBLING

TRAFFIC FACILITIES-YARD REMODELLING & OTHERS

A - Works in Progress

8.1.3

SOUTH EASTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE

2014-15

AllocationParticulars

37 Ramgarh Town - Yard remodelling, Mael - 2nd loop, Barkipona - Addl.loop &

Harubera - 2nd loop

DF(3) 3,25,00

38 Gamharia - Extension of all lines with construction of road under bridge DF(3) 94,00

39 Dongaposi - Bypass line for connection with Kharagpur-Nagpur trunk route avoiding

Rajkharswan

Cap. 25,00

C.Fund ..

40 Kharagpur-Bhadrak - Addl loops in down direction (3 stations) & up direction (2

stations)

DF(3) 4,80,00

41 Jharsuguda - Development of goods shed as freight terminal DF(3) 1,11,00

42 Adra Division - Tokenless block working (10 block sections) DF(3) 25,00

43 Illoo - Addl loop line DF(1) 50,00

44 Barbenda (Block Cabin) - Upgradation of interlocking from standard-I to III with

central panel

DF(3) 21,00

45 Rangra - Development of hot axle siding into full length loading line DF(3) 24,00

46 Kastur - Addl loop facility with central panel DF(3) 73,85

47 Urma - Addl loop facility with central panel DF(3) 1,75,00

48 Sonamukhi & Bhowaichandi - Crossing station with 2 loops each DF(3) 2,50,00

49 Karampada Yard - Extension of CSL at all lines (1 to 6) & shifting of level crossing DF(3) 10,00

50 Balasore - Development & upgradation as freight terminal DF(3) 12,50

51 Namkum - Goods terminal facility for handling full block rakes in one spur with direct

reception & despatch facilities

DF(3) 40,00

52 Santragachi - Development of circulating area, essential passenger amenities & road

connectivity with Kona expressway

DF(3) 1,00

53 Shalimar - Development of coaching terminal by provision of essential passenger

amenities

DF(3) 1,00

54 Hijli - Addl dock platform for electrical multiple units & related activities DF(3) 41,00

55 Sankrail - Freight terminal Cap. 15,00

56 Sankrail-Santragachi - Link line (14.5 km) via flyover from down side to up side DF(3) 1,00

57 Works costing below Rs.2.5 crore each Cap. 48,00

DRF 23,00

DF(1) 49,00

DF(2) 1,00

DF(3) 7,80,00

DF(4) 20,00

TOTAL-WORKS IN PROGRESS Cap. 3,29,00

DRF 23,00

DF(1) 99,00

DF(2) 1,00

DF(3) 28,88,60

DF(4) 20,00

58 Works costing below Rs.2.5 crore each Cap. 1,00

DRF 1,00

DF(1) 1,00

DF(2) 1,00

DF(3) 3,00

TRAFFIC FACILITIES-YARD REMODELLING & OTHERS

B - New Works

8.1.4

SOUTH EASTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE

2014-15

AllocationParticulars

TOTAL-NEW WORKS Cap. 1,00

DRF 1,00

DF(1) 1,00

DF(2) 1,00

DF(3) 3,00

TOTAL-Traffic Facilities-Yard Remodelling & Others Cap. 3,30,00

DRF 24,00

DF(1) 1,00,00

DF(2) 2,00

DF(3) 28,91,60

DF(4) 20,00

59 South Eastern Railway - Extension of unreserved ticketing system to balance A, B, C

& D category stations

DF(1) 20,00

60 South Eastern Railway - Extension of unreserved ticketing system at E-category

stations

DF(1) 80,00

61 South Eastern Railway - Extension of automatic ticket vending machines Cap. 60,00

62 Works costing below Rs.2.5 crore each DRF 3,68,00

DF(1) ..

DF(3) ..

TOTAL-WORKS IN PROGRESS Cap. 60,00

DRF 3,68,00

DF(1) 1,00,00

DF(3) ..

63 South Eastern Railway - Repl of system peripherals of unreserved ticketing system

(Phase-IV)

DRF 1,00

64 South Eastern Railway - Repl of datacom equipment for unreserved ticketing system

(Phase-IV)

DRF 1,00

65 Works costing below Rs.2.5 crore each DRF 30,00

DF(1) ..

DF(3) ..

TOTAL-NEW WORKS DRF 32,00

DF(1) ..

DF(3) ..

TOTAL-Computerisation Cap. 60,00

DRF 4,00,00

DF(1) 1,00,00

DF(3) ..

66 Leased Assets - Payment of Capital component of lease charges to Indian Railway

Finance Corporation

C.Fund 454,76,00

TOTAL-WORKS IN PROGRESS C.Fund 454,76,00

TOTAL-Leased Assets - Payment of Capital Component C.Fund 454,76,00

67 Adra, Chakradharpur & Kharagpur Divisions - Manning of unmanned level crossings

(4, 5 & 7 Nos respectively)

Cap. ..

S.Fund 1

COMPUTERISATION

A - Works in Progress

B - New Works

LEASED ASSETS - PAYMENT OF CAPITAL COMPONENT

A - Works in Progress

ROAD SAFETY WORKS-LEVEL CROSSINGS.

A - Works in Progress

8.1.5

SOUTH EASTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE

2014-15

AllocationParticulars

68 South Eastern Railway - Interlocking of B-class level crossing gates (18 Nos) S.Fund 20,00

69 South Eastern Railway - Manning of unmanned level crossings (170 Nos) S.Fund 2,00,00

70 Kharagpur & Chakradharpur Divisions - Interlocking of level crossing gates (12 Nos) S.Fund 90,00

71 Manning of level crossings on Southern,South Central,South Eastern,Western,

Central,South East Central,South Western & West Central Railways (340 Nos)

S.Fund 75,00

72 Chakradharpur Division - Interlocking of level crossing gates in automatic block

section (16 Nos)

S.Fund 1,70,00

73 South Eastern Railway - Interlocking of level crossing gates outside station limits (18

Nos)

S.Fund 2,50,00

74 Adra, Chakradharpur, Kharagpur & Ranchi Divisions - Pre-cast fibre RCC block at

level crossings (320 Nos)

S.Fund 1,90,23

75 Works costing below Rs.2.5 crore each S.Fund 8,35,76

TOTAL-WORKS IN PROGRESS S.Fund 18,31,00

75a South Eastern Railway - Interlocking of level crossing gates (7 Nos) S.Fund ..

76 Works costing below Rs.2.5 crore each S.Fund 29,00

TOTAL-NEW WORKS S.Fund 29,00

TOTAL-Road Safety Works-Level Crossings. S.Fund 18,60,00

77 Andul-Sankrail - Road over bridge in lieu of level crossing No.13 S.Fund 1

EBR ..

78 Soro - Road over bridge in lieu of level crossing No.105 S.Fund 2,50,00

EBR ..

79 Bankura-Chhatna - Road over bridge in lieu of level crossing No.KA-94 S.Fund 1

EBR ..

80 Urma-Barabhum - Road over bridge in lieu of level crossing No.JC-40 S.Fund 1

EBR ..

81 Kolaghat-Bagnan - Road over bridge in lieu of level crossing No.35 S.Fund 1

EBR ..

82 Kharagpur-Gokulpur - Road over bridge in lieu of level crossing No.KA-1 & KA-2 S.Fund 1

EBR ..

83 Nalpur-Bauria - Road over bridge in lieu of level crossing No.18 S.Fund 1

EBR ..

84 Jhalda-Kotsila - Road over bridge in lieu of level crossing No.MK-16 S.Fund 1

EBR ..

85 Jhalda-Kotsila - Road over bridge in lieu of level crossing No.MK-18 S.Fund 1

EBR ..

86 Purulia-Gourinathdham - Road over bridge in lieu of level crossing No.PK-3 S.Fund 1

EBR ..

ROAD SAFETY WORKS-LEVEL CROSSINGS.

B - New Works

ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.

A - Works in Progress

8.1.6

SOUTH EASTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE

2014-15

AllocationParticulars

87 Adra Yard - Road over bridge at km 283/32-34 in west end for connecting North &

South settlement

S.Fund 1

EBR ..

88 Chakradharpur - Road over bridge in lieu of A-class level crossing No.171 S.Fund 1

EBR ..

89 Bagnan - Road over bridge in lieu of B-class level crossing No.39 S.Fund 2,05,00

EBR 3,30,00

90 Balichak - Road over bridge in lieu of level crossing No.52 S.Fund 1

EBR ..

91 Jhargram - Road over bridge in lieu of level crossing No.82 S.Fund 1,33,00

EBR ..

92 Kharagpur - Road over bridge in lieu of level crossing (Puri Gate) at Indian Institute of

Technology

S.Fund 1

EBR ..

93 Rourkela - Road over bridge in lieu of level crossing at km 415/ 11-13 near Basanti

colony

S.Fund 1,16,70

EBR ..

94 Bhadul-More - New road over bridge at km 230/7-8 & 229/5-7 between Bankura-

Vishnupur

S.Fund 2,00,00

EBR 3,30,00

95 Uluberia-Birshibpur - Road over bridge in lieu of level crossing No 28 S.Fund 1

EBR ..

96 Jamshedpur - Widening of subway at km 250/14 S.Fund 75,00

EBR ..

97 Jhinkpani-Singpokharia - Road over bridge in lieu of level crossing No.RBK-21 S.Fund 1

EBR ..

98 Tamulia - Road over bridge in lieu of level crossing No.81 near Balasore S.Fund 3,00,00

99 Gokulpur Yard - Road under bridge in lieu of level crossing Nos.KY-15, KA-4 & KA-5 S.Fund 1

100 Talaburi-Jhinkpani - Road over bridge in lieu of level crossing No.RBK-26 S.Fund 1

EBR ..

101 Namkom-Tatisilwai - Road over bridge in lieu of level crossing No.MH-21 S.Fund 1

EBR ..

102 Kharagpur - Tatanagar - Road over bridge in lieu of level crossing No.103 near

Chakulia

S.Fund 1

EBR ..

103 Hatia - Widening of road over bridge at km 423/30-32 near Birsa Chowk S.Fund 1

EBR ..

104 Kendposi-Talaburu - Road over bridge in lieu of level crossing No.RBK-30 S.Fund 1

EBR ..

105 Namkom-Tatisilvai - Road over bridge in lieu of level crossing No.MH-23 S.Fund 1

EBR ..

106 Chaibasa-Singpokharia - Road over bridge in lieu of level crossing No.RBK-14 S.Fund 1

EBR ..

ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.

8.1.7

SOUTH EASTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE

2014-15

AllocationParticulars

107 Talaburu-Jhinkpani - Road over bridge in lieu of level crossing No.RBK-24 S.Fund 1

EBR ..

108 Rourkela-Panposh - Road over bridge in lieu of level crossing No.212 S.Fund 1

EBR ..

109 Tatanagar - Road over bridge in lieu of level crossing No.141 S.Fund 1

EBR ..

110 Noamundi-Barajamda - Road over bridge in lieu of level crossing No.RBK-49 S.Fund 1

EBR ..

111 Rourkela-Panposh - 2-lane road over bridge in lieu of level crossing No.211 S.Fund 1

EBR ..

112 Silli-Muri - Road over bridge in lieu of level crossing No.MH-4 S.Fund 1

EBR ..

113 Works costing below Rs.2.5 crore each S.Fund 27,78,20

TOTAL-WORKS IN PROGRESS S.Fund 40,58,19

EBR 6,60,00

114 Ramgarh - Rebuilding of road over bridge at km 88 (Bijulia) (national highway No.33) S.Fund 1

EBR ..

115 Works costing below Rs.2.5 crore each S.Fund 50

TOTAL-NEW WORKS S.Fund 51

TOTAL-Road Safety Works-Road Over/Under Bridges. S.Fund 40,58,70

EBR 6,60,00

116 Rajkharswan-Chakradharpur - TRR(P) with TFR - 7.9 km DRF 8,52,86

117 Sonua-Chakradharpur - TRR(P) with TFR - 16.29 km DRF 1,42,14

118 Kharagpur - Bhadrak - TTR (22 sets) DRF 1,27,86

119 Kharagpur -Tatanagar - TTR (101 sets) DRF 75,21

R.

120 Muri - Barkakana & Muri - Hatia - CTR - 20 km (S) DRF 1,00

R.

121 Kharagpur-Bhadrak - CTR(P) - 6.84 km DRF 25,43

122 Howrah-Kharagpur - TRR(P) - 6.8 km DRF 99,15

123 Bondamunda-Barsuan - CTR(P) - 8.44 km DRF 2,42,19

124 Tatanagar-Rourkela - TRR(P) - 10.47 km DRF 3,42,20

125 Padapahar- Banspani - CTR(P) - 15.55 km (excl TBR) DRF 1,39,49

126 Howrah-Kharagpur - CTR(P) - 3.06 km DRF 50,90

127 Panskura-Haldia - TRR(P) - 18.4 km DRF 2,12,45

Complete Track Renewal

128 Rourkela-Birmitrapur - CTR(P) - 5.07 km & TRR(P) - 21.43 km DRF 1,42,14

R.

ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.

B - New Works

TRACK RENEWALS

A - Works in Progress

8.1.8

SOUTH EASTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE

2014-15

AllocationParticulars

129 Kharagpur - Bhadrak - CTR(P) - 29.75 km DRF 3,99,60

R.

130 Gokulpur - Cossye - Midnapur - CTR(P) - 0.6 km & TRR(P) - 4.2 km DRF 6,73

R.

131 Adra Division - CTR(S) - 11.41 km (various yards) DRF 14,20

R.

132 Sini, Rajkharswan & Adityapur (Yards) - CTR(S) - 5.12 km DRF 1,57,38

R.

133 Rourkela - Jharsuguda (Yard Lines) - CTR(S) - 4.853 km (4 stations) DRF 1,52,76

R.

134 Jaleswar-Basta - CTR(P) - 2 km DRF 3,11

R.

135 Kharagpur-Midnapur - CTR(P) - 1.75 km DRF 2,67

R.

136 Kharagpur-Benapur - CTR(P) - 3.7 km DRF 1,08,98

R.

137 Kharagpur Yard - CTR(S) - 5.77 km DRF 1,63,67

R.

138 Bondamunda-Lathikata - CTR(P) - 1.843 km DRF 35,49

R.

139 Kokpara-Dhalbhumgarh - CTR(P) - 2.773 km DRF 1,13,76

R.

140 Datan-Basta - CTR(P) - 11.37 km & TRR(P) - 10.33 km DRF 70,82

R.

141 Nakuseni-Lakhnnath Road - CTR(P) - 6 km DRF 3,63,31

R.

142 Kharagpur-Bhadrak- CTR(P) - 4.4 km DRF 1,45,31

R.

143 Kharagpur - Bhadrak - CTR(P) - 6 km DRF 1,45,31

R.

144 Bondamunda-Orga - CTR(P) - 3 km & TSR(P) - 18.5 km DRF 1,39,49

R.

145 Kharagpur - Bhadrak - CTR(P) - 3.728 km & TSR(P) - 4.6 km DRF 72,65

R.

146 Kharagpur - Bhadrak - CTR(P) - 3.9 km DRF 1,45,31

R.

147 Rajkharswan - Dongoaposi - CTR(S) - 3.30 km DRF 1,89,35

R.

148 Jharsuguda - Rourkela - TRR(S) - 7.555 tkm DRF 2,44,51

149 Gamharia -Chandil - TRR(S) - 6.9 km DRF 2,44,51

150 South Eastern Raiwlay - CTR - 6.05 km (S) (various assisted sidings) DRF 86,53

EBR ..

TRACK RENEWALS

8.1.9

SOUTH EASTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE

2014-15

AllocationParticulars

151 Pokla, Mahabung & Balsiring - CTR - 5.48 km (S) DRF 4,19

R.

152 Birmitrapur, Rourkela, Bondamunda & Jharsuguda - CTR - 14.686 km (S) (loop lines) DRF 2,27,22

R.

153 Noamundi, Barajamda, Barbil & Gua - CTR - 9.05 km (S) (loop lines) DRF 1

R.

154 Sini Workshop - CTR - 7 km (S) DRF 1,21

R.

155 Banspani - Deojhar - Dongaposi (Yard lines) - CTR - 4.6 km (S) DRF 4,73

R.

156 Bondamunda - Lathikata - CTR - 4.32 km & Bondamunda - Dumetra - TRR - 1.38 km

(P)

DRF 1,31,73

R.

157 Patasahi - Bimlagarh - Dumetra - Patasahi - CTR - 0.18 km & TRR - 9.87 km (P) DRF 57,74

R.

158 Adra Division - CTR - 11.154 km (S) (assisted siding) DRF 1,10,13

EBR ..

159 Adra Division - CTR - 9.7 km (S) (loops of 5 sations) DRF 1,09,60

R.

160 Bokaro Steel City (Yard Lines) - CTR - 19.11km (S) DRF 22,47

R.

161 Rajkharswan, Mahalimarup & Sini - CTR - 6 km (S) DRF 2,27,22

R.

162 Bokaro Steel City-Rajabera - CTR - 5 km (P) DRF 14,43

R.

163 Bokaro Steel City - Rajabera - CTR - 4.313 km & TRR - 0.287 km (P) DRF 91,09

R.

164 Mael - Ramgargh Town - CTR - 4.5 km (P) DRF 1,00

R.

165 Adra Division - CTR - 12.464 km (different yard lines) DRF 1,31,44

R.

166 Chakrkadharpur Division (Yard Lines) - CTR - 2.635 km (S) DRF 61,51

R.

167 Bahalda Road - Badampahar - CTR - 16.61 km (S) DRF 2,52,47

R.

168 Rupsa - Balasore - CTR - 19.66 km (P) DRF 1,81,64

R.

169 Lathikata - Bimlagarh - CTR - 3.112 km (P) DRF 41,85

R.

170 Bondamunda Yard - CTR - 9.4 km (P) DRF 2,51,09

R.

TRACK RENEWALS

8.1.10

SOUTH EASTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE

2014-15

AllocationParticulars

171 Hijli - Nimpura (South Avoiding Line) - CTR - 3.87 km (P) DRF 1,45,31

R.

172 Benapur - Rupsa Hijli Goods - CTR - 21.985 km (P) DRF 1,81,64

R.

173 Tati - Parvatania - CTR - 2.35 km (P) DRF 1,00

R.

174 Bondamunda, Adityapur, Yard Lines of Tata - CTR - 22.393 km (S) DRF 1,26,23

R.

175 Kharagpur Workshop - CTR -17.155 km (S) (different sidings) DRF 72,91

R.

176 Hatia Yard - CTR -11.862 km (S) (loop lines) DRF 1,00

R.

Through Rail Renewal

177 Mohuda - Gomoh - TRR(P) - 8.52 km DRF 1,85,61

178 Adra - Indrabil - TRR(P) - 2.872 km DRF 20,03

179 Sini - Rajkharswan - TRR(P) - 16.6 km DRF 2,84,29

180 Howrah - Balichak - TRR(P) - 17.27 km DRF 1,60,84

181 Panskura - Haldia - TRR(P) - 7.6 km DRF 1,27,47

182 Shyamchak-Madpur - TRR(P) - 3 km DRF 56,73

183 Haur-Balichak - TRR(P) - 3.5 km DRF 26,00

184 Bokaro Steel City Yard - TRR(S) - 6 km DRF 2,01,80

185 Khemasoli-Kharagpur - TRR(P) - 7.84 km DRF 70,82

186 Monoharpur, Goelkera, Posoita & Tunia - TRR(S) - 5.824 km (loop lines) DRF 2,44,51

187 Tata-Rajkharswan & Sini-Chandil - TRR(P) - 32.24 km DRF 1,42,14

188 Rakhamines-Galudih - TRR(P) - 4.01 km DRF 1,27,47

189 Haludpukur-Bahalda Road & Rajkharswan & Sini Yards - TRR(S) - 22.045 km DRF 1,22,26

190 Adra (Different Yard Lines) - TRR(S) - 15.175 km DRF 2,23,76

191 Kharagpur-Tatanagar - TRR(P) - 9.68 tkm DRF 70,82

192 Rourkela-Jharsuguda - TRR(P) with TFR - 19.11 km DRF 1,42,14

193 Rajkharswan-Barabamboo, Sini-Kandra & Adityapur Yard - TRR(P) - 7.9 km &

TRR(S) - 1.20 km

DRF 1,42,14

194 Anara - Chandil - TRR(P) - 10.96 km DRF 80,13

195 Kharagpur - Bhadrak - TRR(P) - 3.4 km DRF 1,41,64

196 Barlanga - Borkipana - TRR - 6 km (P) DRF 90

197 Muri - Kotshila - TRR - 22.5 km (P) DRF 1,86,10

198 Banspani & Padapahar Yard - TRR - 10.8 km (S) DRF 6,09

199 Nimpura Yard Complex - TRR - 5 km & TSR - 1.3 km (S) DRF 2,74

R.

200 Anara - Chandil - TRR - 12.5 km (P) DRF 20,40

TRACK RENEWALS

8.1.11

SOUTH EASTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE

2014-15

AllocationParticulars

201 Kendposi - Pendrasali - TRR - 21.21 km (P) DRF 10,82,91

202 Pendrasal i -Talaburu - TRR - 12.82 km (P) DRF 1,42,14

203 Radhagaon -Tupkadi - TRR - 5.815 km (P) DRF 1,08,17

204 Shewbabudih - Mohuda - TRR - 7.9 km (P) DRF 28,04

205 Adityapur - Gamaharia - TRR - 5.6 km (P) DRF 2,84,29

206 Kharagpur (Associated Cement Corporation Link) - TRR - 10 km (P) DRF 28,33

207 Talgoria - Mohuda - TRR - 5.4 km (P) DRF 1,36,85

208 Barabomboo - Posoita - TRR - 42.25 km (P) DRF 2,84,29

209 Uluberia - Kharagpur - TRR - 8 km (P) DRF 70,82

210 Tata - Haludpukur - TRR - 14 km (S) DRF 2,19

211 Barajamda, Gua & Bolanikhadan -TRR - 5.5 km (S) (yard lines) DRF 63

212 Kharagpur Yard - TRR - 6.884 km (S) DRF 4,23

Through Sleeper Renewal

213 Jhinkpani - Kendposi - TSR(P) -10 km & Rajkharswan - Nowamundi - TBR - 73.5 km DRF 1,30,21

R.

214 Tamna-Kantadih - TSR(P) - 4 km DRF 2,79

R.

215 Bhojudih-Mohuda - TSR(P) - 0.85 km & TRR(S) - 4.94 km (yard lines) DRF 41,63

R.

216 Bokaro Steel City - TSR(P) - 4.75 km & TRR(S) - 17 km (yard lines) DRF 83,25

R.

217 Sabira-Markona - TSR(P) - 4.78 km DRF 1,35,73

R.

218 Kharagpur - Bhadrak - TSR(P) - 5.1 km DRF 1,50,82

R.

219 Jhimiri - Tiruldih -TSR - 13 km (P) DRF 97,39

R.

220 Bondamunda - Jharsuguda - TSR (18578 Nos) DRF 1,80

221 Adra Division - TSR(P) - 1.469 km & TRR(S) - 7.749 km (different yard lines) DRF 20,81

R.

Ballast

222 Bankura - Adra - TBR - 86 km DRF 1,25,00

R.

223 Chakradharpur - Jharsuguda - TBR - 66.62 km DRF 7,67

R.

224 Kharagpur Division - TBR -154.3 km (different locations) DRF 1,00,00

R.

225 Kharagpur Division - TBR - 130.67 km (different sections) DRF 1,00,00

R.

TRACK RENEWALS

8.1.12

SOUTH EASTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE

2014-15

AllocationParticulars

226 Adra-Bankura - TBR - 27.6 km DRF 1,25,00

R.

227 Bhowrah-Mohuda - TBR - 15.15 km DRF 1,86,40

R.

228 Rourkela - Jharsuguda - TBR - 42 km DRF 1,00,00

R.

229 Bokaro Steel City - TBR - 18.7 km DRF 2,00,00

R.

230 Bimlagarh-Kiriburu - TBR - 20.784 km DRF 2,00,00

R.

231 Midnapore-Bankura - TBR - 20 km DRF 1,60,00

R.

232 Mohuda-Chandrapura - TBR - 28.65 km DRF 2,00,00

R.

233 Anara-Chandil - TBR - 54 km DRF 1,00,00

R.

Points & Crossings

234 Adra Division - TTR - 69 sets (6 stations) DRF 1,03,90

R.

235 Chakradharpur Division (Yard Lines) - TTR - 117 sets ( 5 stations) DRF 1,74,25

R.

236 Howrah - Kharagpur (Yard) -TTR - 118 sets (5 stations) DRF 7,52

R.

237 Hatia - Orga - TTR - 93 sets (5 stations) DRF 1,12,78

R.

238 Panskura-Haldia - TTR - 20 sets DRF 1,12,82

R.

239 Chakradharpur Division - TTR - 38 sets (8 stations) DRF 3,39,49

240 Adra Division - TTR - 119 sets & derailing switches - 14 sets (7 stations) DRF 2,33,10

R.

241 Chakradharpur & Lotapahar Yards - TTR - 23 sets DRF 3,93,81

R.

242 Chakradharpur Division - TTR - 97 sets (9 stations) DRF 10,86,38

243 Rourkela-Jharsuguda - TTR - 32 sets (5 stations) DRF 1,35,80

244 Kharagpur Yard - TTR - 19 sets DRF 95,22

R.

245 Tatanagar Yard - TTR - 42 set & derailing switches - 8 sets DRF 2,71,60

R.

246 Rajkharswan - Dangoaposi - TTR (21 sets) & TTR (6 sets) DRF 4,07,39

R.

247 Bondamunda, Bangurkela & Nuagaon Yard - TTR (113 sets) DRF 2,80,29

R.

TRACK RENEWALS

8.1.13

SOUTH EASTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE

2014-15

AllocationParticulars

248 Tatanagar Yard - TTR (50 sets) DRF 1,70,00

R.

249 Kharagpur - Bhadrak - TTR (23 sets) DRF 1,42,91

R.

250 Kharagpur - Bhadrak - TTR (30 sets) DRF 1,88,03

R.

251 Adra Division - TTR - 74 sets & derailing switches - 20 sets (11 stations) DRF 1,24,68

R.

252 Rajkharswan & Sini Yards - TTR - 31 sets DRF 1,35,80

Others

253 Kharagpur - Bhadrak - TFR - 135.54 km DRF 55,19

254 Anara-Chandil - TWR - 53.7 km DRF 1,09,53

255 Muri-Hatia - TWR - 68 km DRF 1,71,40

256 Hatia-Orga - TWR - 57.45 km DRF 1,05,28

257 Hatia-Orga (SL) - TFR - 32.25 km. DRF 60,87

258 Rourkela-Jharsuguda - TWR - 42.13 km DRF 1,26,23

259 Kharagpur-Bhadrak - TFR - 80.22 km DRF 98,89

260 Adra-Midnapur - TWR - 99 km DRF 1,09,53

261 Kharagpur - Adra - TTR (14 sets) DRF 1,05,30

262 Bondamunda-Barsua, Bimlagarh-Kiriburu - TFR - 79.749 km DRF 1,40,82

263 South Eastern Railway - TTR (different yards) (82 sets) DRF 1,45,60

R.

264 South Eastern Railway - TTR (different yards) (87 sets) DRF 1,68,27

265 Adra Division -TTR (107 sets) DRF 94

R.

266 Panskura - Haldia - TTR (31 sets) DRF 4,51

R.

267 South Eastern Railway - TTR (25 sets) (6 stations) DRF 2,82

R.

268 Tangarmunda - Bagdehi - TFR - 86 km DRF 70,41

269 Muri - Hatia & Chandil - Muri - TTR (30 sets) DRF 1,00

R.

270 Hatia - Orga - TTR (30 sets) DRF 1,28,65

R.

271 Muri - Barkakhana, Muri - Kotshila & Muri - Hatia - TTR (30 sets) DRF 1,50

R.

272 Ranchi Division - TTR - 12 & derailing switches (31 sets) DRF 36

R.

273 Bondamunda - Barsuan - Kiriburu - TTR (44 sets) DRF 1,22,22

R.

274 Rourkela - Jharsuguda, Hatia - Bondamunda & Birmitrapur - TTR (60 sets) DRF 1,22,22

R.

TRACK RENEWALS

8.1.14

SOUTH EASTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE

2014-15

AllocationParticulars

275 Tata Yard - TTR - (30 sets) DRF 1,80,73

R.

276 Sini - Rajkharswan - TTR (16 sets) DRF 4

R.

277 Kharagpur - Tatanagar - TTR (30 sets) DRF 7,52

R.

278 Hatia - Orga - TTR (30 sets) DRF 1,00

R.

279 Chandil - Muri - Ranchi - TTR ( 20 sets) DRF 10,00

R.

280 Bondamunda - Barsuan - TBR - 35.5 km DRF 99

R.

281 Dongaposi - Padapahar - TBR - 52.72 km DRF 99

R.

282 Chandil - Sini Station - TBR - 27.89 km DRF 3,29

R.

283 Silli - Gangaghat - TBR - 20 km DRF 84,32

R.

284 Rourkela - Jharsugada - TWR - 34 km DRF 37,87

285 Sini - Barabamboo - TWR - 24 km & TFR - 41 km DRF 1,97,80

286 Sankrail - Radhamonapur - TFR - 59.3 km DRF 35,87

287 Noamundi, Barajamda, Barbil, Gua & Bolanikhadan - TTR (28 Sets) DRF 2,58,01

R.

288 Tatanagar Yard - TTR (50 Sets) DRF 81,48

R.

289 Chakradharpur Yard - TTR (20 sets) DRF 1,29,01

R.

290 Kharagpur Division - TTR (73 sets) (various stations yard) DRF 10,53

R.

291 Gamharia - Barabamboo & Sini - Kandra - TBR - 53.47 km DRF 1,20,44

R.

292 Tata - Gurumahisani - TBR - 54.68 km DRF 28,27

R.

293 Muri - Hatia & Muri - Chandil - TBR - 90 km DRF 2,29,30

R.

294 Chakradharpur & Kharagpur Divisions - Through switch & crossings renewal of

turnouts with thick web switches & weldable CMS crossings (734 sets)

DRF 1,29,32

295 Chakradharpur & Kharagpur Division - Through renewal of turnouts with thick web

switches & weldable CMS crossings (109 sets)

DRF 1,47,00

R.

296 Anara Yard - TTR (28 sets) DRF 1,04,43

R.

TRACK RENEWALS

8.1.15

SOUTH EASTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE

2014-15

AllocationParticulars

297 Bokaro Steel City Yard - TTR (70 sets) DRF 94,75

R.

298 Adra Division (Different Sections) - Through switches & crossings renewal (202 sets) DRF 1,31,00

R.

299 Ranchi Division (Different Sections) - Through switches & crossings renewal (200

sets)

DRF 1,77,54

R.

300 Kharagpur-Tata - TWR - 77.08 km DRF 5,73

301 Pendrasoli - Kendposi - TBR - 35.2 km DRF 28,87

R.

302 Ranchi Division (Different Sections) - TBR - 85 km DRF 23

R.

303 Adra Division - TTR (95 sets) (10 stations) DRF 14,55

R.

304 Chakradharpur Division - TTR (229 sets) (20 stations) DRF 1,35,80

R.

305 Mecheda, Tikiapara, Santragachi, Padmapukur & Shalimar - TTR (92 sets) DRF 73,21

R.

306 Kharagpur Workshop - TTR (30 sets) (S) DRF 37,61

R.

307 Adra-Rukni, Rukni - Bhojudih & Pundag-Bokaro Steel City - TBR - 70.2 km DRF 1,25,00

R.

308 Chakradharpur Division - TBR - 93.488 km (9 locations) DRF 90,00

R.

309 Adra Division - TFR - 362.55 km DRF 1,75,00

310 Kharagpur Division - TFR - 63.04 km DRF 1,54,20

311 Kharagpur Workshop - TFR - 19 km & TBR - 34.5 km DRF 72,31

R.

312 Adityapur - Gamharia & Rourkela -Jharsuguda - TWR/TFR - 38.15 km DRF 1,26,23

313 Works costing below Rs.2.5 crore each DRF 26,75,00

TOTAL-WORKS IN PROGRESS DRF 274,20,10

314 Haur -Panskura (down) - TRR(P) - 4.36 Tkm DRF 1,15,47

315 Rangra -Karampada(SL) - TRR(P) - 7.05 km DRF 1,86,70

316 Chakradharpur - Monoharpur (loops at 4 stations) - TSR(P) - 5.824 km DRF 1,32,17

R.

Through Rail Renewal

317 Rourkela -Jharsuguda - TRR(P) - 39.548 Tkm DRF 11,62,73

318 Balichak - Madpur (up) - TRR(P) - 6 tkm DRF 1,58,90

319 Rukni- Bhojudih - TRR(P) - 8.3 km DRF 1,36,71

TRACK RENEWALS

B - New Works

8.1.16

SOUTH EASTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE

2014-15

AllocationParticulars

320 Bondamunda - Orga (SL) - TRR(P) - 19.545 Tr km DRF 4,47,61

321 Guludi - Salgajhari - TRR(P) - 8.65 tkm DRF 2,29,02

322 Kita - Gangaghat (up) - TRR(P) - 7.035 Tkm DRF 1,86,31

323 Kita - Gautamdhara (up&down) - TRR(P) - 5.04 Tkm DRF 1,45,26

Through Sleeper Renewal

324 Bankura-Midownapur (down) - TSR (P) - 10.5 km DRF 1,83,29

R.

325 Works costing below Rs.2.5 crore each DRF 2,95,73

TOTAL-NEW WORKS DRF 33,79,90

TOTAL-Track Renewals DRF 308,00,00

326 Adra-Gomoh - Repl. of steel girders by IRS girders of bridge Nos.412-up, 432 & 409 DRF 1,00,00

SRSF ..

327 Kharagpur Division - Regirdering, recapping, jacketing incl. steel channel sleepers

(bridge Nos 215-up, 263-down & 84-down) (14 spans)

DRF 1,00,00

SRSF ..

328 Jharsuguda - Bondamunda - Tatanagar - Kharagpur - Panskura - Haldia - Inputs on

bridges for running 25 ton axle load trains

DRF 87,79

329 Rajkharswan-Dongaposi- Barajamda-Gua-Bolanokhadan- Banspani - Inputs on

bridges for running 25 ton axle load trains

DRF 30,00

330 Kharagpur-Rupsa-Bhadrak - Inputs on bridges for running 25 ton axle load trains DRF 70,00

331 Chakradharpur Division - Strengthening of bridges by reinforced concrete cement

boxes (16 bridges)

DRF 1,50,00

332 Chakradharpur Division - Strengthening by reinforced concrete cement pre-cast

boxes (24 bridges)

DRF 1,80,00

333 Pendrasali-Rajkharswan - Jacketing of abutment, piers & intrados of arch bridge

No.6-A

DRF 1,11,53

334 Howrah-Kharagpur - Metalising of triangulated spans (floor system) (bridge Nos.57-

up, down & mid)

DF(4) 1,67,73

335 Narayangarh-Bhakrabad - Rebuilding (bridge No.168 up) DRF 70,00

336 Works costing below Rs.2.5 crore each DRF 8,01,68

DF(1) 1,00

DF(3) 54,91

DF(4) 2,62,27

TOTAL-WORKS IN PROGRESS DRF 17,01,00

DF(1) 1,00

DF(3) 54,91

DF(4) 4,30,00

337 Works costing below Rs.2.5 crore each DRF ..

TOTAL-NEW WORKS DRF ..

TRACK RENEWALS

BRIDGE WORKS

A - Works in Progress

B - New Works

8.1.17

SOUTH EASTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE

2014-15

AllocationParticulars

TOTAL-Bridge Works DRF 17,01,00

DF(1) 1,00

DF(3) 54,91

DF(4) 4,30,00

338 Chakradhapur Division - Repl of signalling gears with centralised operation of points

& signals (13 stations)

DRF 66,40

SRSF ..

339 Kharagpur, Chakradharpur & Adra Divisions - Block proving by axle counters at

central panel interlocked stations (33 block sections)

DF(4) 84,00

340 Kharagpur & Chakradharpur Divisions - Repl. of signalling gears by electrical

operation of points & signals (E-route) (13 stations)

DRF 5,85,00

341 Adra Division - Repl. of signalling gears by electrical operation of points & signals (E-

route) (10 stations)

DRF 2,55,00

342 South Eastern Railway - Track circuiting from fouling mark to block limit (turnout),

home to fouling mark (E-Spl route) (main line) (33 stations)

DF(4) 66,36

343 Howrah-Panskura - Repl. of automatic signalling for enhancing safety in train

operation

DRF 2,40,00

344 South Eastern Railway - Home to fouling mark track circuiting (turnout) (E-Spl route)

(28 stations)

DF(4) 40,00

345 South Eastern Railway - Fouling mark to block (straight) track circuiting (9 places) &

home to fouling mark (straight) (18 places) (E-Spl & E-routes)

DF(4) 20,00

346 South Eastern Railway - Track circuiting of loop lines (13 stations) (E & E-Spl routes) DF(4) ..

347 South Eastern Railway - Repl. of lever frames & ground gears by electrical operation

of points & signals (5 stations)

DRF 2,62,00

348 Santragachi - Repl. of route relay interlocking DRF 52,74

349 Chakradharpur & Kharagpur - Data logger at auto sections & 25 route relay / panel

interlocked stations

Cap. 92,00

EBR ..

350 Hatia - Repl. of lever frames & ground gears by route relay interlocking DRF 6,00,00

DF(4) ..

351 Kharagpur - Repl. of route relay interlocking DRF 4,40,00

352 Tikiapara - Repl. of route relay interlocking DRF 2,20,00

353 Ranchi Division - Complete track circuiting (loop lines) (30 stations) (E-Spl & E-route) DF(4) 85,00

354 Kolkata Area - Public address system in suburban trains (50 rakes) DF(1) ..

355 Nimpura & Kharagpur Departure Yard - Repl.of lever frames & ground gears by solid

state interlockings (A-route)

DRF 2,50,00

356 Shalimar - Repl of lever frames & ground gears by panel interlocking DRF 40,00

357 Kharagpur, Chakradharpur & Adra Divisions - Block proving by axle counters (6, 3 &

1 block sections respectively)

DF(4) 7,59

358 Adra & Kharagpur Division - Repl of signalling gears with centralised operation of

points & signals (7 stations) (D-Spl route)

DRF 1,21,00

359 Adra, Chakradharpur & Kharagpur Divisions - Block proving by axle counters (12, 1 &

13 block sections respectively)

DF(4) 2,56,00

360 Sardiha-Jhargram, Jhargram-Gidhni & Gidhni-Chakulia - Repl of intermediate block

signal

DRF 25,00

SIGNALLING AND TELECOMMUNICATION

A - Works in Progress

8.1.18

SOUTH EASTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE

2014-15

AllocationParticulars

361 Abada & Galudih - Repl. of signalling gears with centralised operation of points &

signals

DRF 1,20,00

362 Adra, Kharagpur & Ranchi Divisions - Addl backup power supply equipment (63

stations, 16 level crossing gates & 7 intermediate block huts)

DF(4) 66,37

363 Adra Division - Repl of signalling gears with centralised operation of points & signals

(7 stations) (D-route)

DRF 1,50,00

364 South Eastern Railway - Data loggers (40 stations) (D & D-spl routes) DF(4) 67,38

365 Adra & Kharagpur Divisions - Repl of signalling gears with centralised operation of

points & signals (5 & 2 stations respectively) (E-route)

DRF 1,70,00

366 Tatanagar-Rajkharswan - Repl. of automatic signalling (A-route) DRF 1,80,00

367 Howrah-Kharagpur-Tatanagar - Train protection system (250 rkm) DF(4) 1

368 Howrah-Kharagpur - Train management system (28 stations) DF(3) 1

369 Chakradharpur Division - Repl of integrated power supply (15 stations) DRF 6,78

370 Tatanagar - Chakradharpur - Train protection & warning system - 97 rkm DF(4) ..

371 South Eastern Railway - Anti-collision device on all broad gauge A-routes (excl

Howrah-Kharagpur), B, D & D-Spl routes (1336 rkm)

DF(4) ..

372 South Eastern Railway - Isolation & upgradation of signalling (2 stations) DF(4) 1,15,00

373 Works costing below Rs.2.5 crore each DRF 8,16,07

DF(3) 2,14,56

DF(4) 4,79,40

TOTAL-WORKS IN PROGRESS Cap. 92,00

DRF 45,99,99

DF(1) ..

DF(3) 2,14,57

DF(4) 12,87,11

373a Bankura-Vishnupur - Repl of signalling gears with electronic interlocking DRF 1

DF(4) ..

374 Works costing below Rs.2.5 crore each DRF ..

DF(4) ..

TOTAL-NEW WORKS DRF 1

DF(4) ..

TOTAL-Signalling and Telecommunication Cap. 92,00

DRF 46,00,00

DF(1) ..

DF(3) 2,14,57

DF(4) 12,87,11

375 Bondamunda - 2nd high tension 33 kv feeder from Rourkela grid sub-station &

Rourkela - 33/11 kv supply at railway colony

DF(3) 50,00

SIGNALLING AND TELECOMMUNICATION

B - New Works

OTHER ELECTRICAL WORKS EXCL TRD

A - Works in Progress

8.1.19

SOUTH EASTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE

2014-15

AllocationParticulars

376 Kharagpur & Santragachi - Repl of high tension panels DRF 90,35

377 Works costing below Rs.2.5 crore each DRF 2,11,14

DF(2) 60

DF(3) 42,79

TOTAL-WORKS IN PROGRESS DRF 3,01,49

DF(2) 60

DF(3) 92,79

378 Chakradharpur Division - Renovation of high tension power supply arrangement by

repl of circuit breakers at different stations

DRF 1

379 Works costing below Rs.2.5 crore each DRF 4,50

DF(2) 2,61

DF(3) 4,00

TOTAL-NEW WORKS DRF 4,51

DF(2) 2,61

DF(3) 4,00

TOTAL-Other Electrical Works excl TRD DRF 3,06,00

DF(2) 3,21

DF(3) 96,79

380 Kharagpur-Tatanagar - Renewal of overhead equipment for up & down lines incl yard

(Phase-II)

DRF 60,00

381 Chakradharpur Division - Repl. of contact wire with associated items DRF ..

382 Adra Division - Repl. of contact & catenary wires DRF 1

383 Chakradharpur Division - Repl. of equipment by mechanised stringing method (333

km)

DRF 29,90

384 Kharagpur Division - Repl. of 600 amp rocker type isolators by 1250 amp knife type

isolators

DRF 62,00

385 Howrah-Kharagpur-Tatanagar - Improvement of horizontal clearance (250 masts)

(Phase-III)

DRF 69,00

386 Chakradharpur Division - Improvement of horizontal clearance of traction masts

(Phase-VII)

DRF 2,96,00

387 Kharagpur-Tatanagar - Renewal of overhead equipment (Phase-III) DRF 1

388 Howrah-Kharagpur-Tatanagar - Improvement of horizontal clearance (690 masts) &

rectification of leaning masts (402 Nos)(Phase-IV)

DRF 2,70,00

389 Jharagram - New railway owned traction sub-station DF(3) 3,80,41

390 Kharagpur Division - Repl. of contact & catenary wires DRF 1,20,00

391 Chakradharpur Division - Repl of regulating equipment DRF 3,00,00

392 Chakradharpur Division - Repl of cantilever assembly DRF 4,90,00

393 Adra-Bhojudih - Conversion of un-regulated overhead equipment into regulated one DRF 2,00,00

394 Adra Division - Improvement of implantation of overhead equipment mast having

critical implantation (750 Nos)

DRF 75,00

OTHER ELECTRICAL WORKS EXCL TRD

B - New Works

TRACTION DISTRIBUTION WORKS

A - Works in Progress

8.1.20

SOUTH EASTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE

2014-15

AllocationParticulars

395 Chakradharpur Division - 25 kv sub-sectioning posts (8 stations) DF(3) 40,00

396 Purulia - 132/25 kv railway owned traction sub-station in repl of feeding post DRF 1,43,00

397 Rajkharswan - Repl of sub-stations DF(3) 1,01,34

398 Kharagpur Division - Renewal of overhead equipment DRF 2,97,00

399 Salgajhari - Augmentation of power transformer with switchgear DRF 40,00

400 Bondamunda - 220/25 kv railway owned traction sub-station DF(3) 45,00

401 Adra Division- Improvement of implantation of overhead equipment masts DRF 1

402 Bankura - Second 132/25 kv traction power transformer DF(3) 10,00

403 Chakradharpur Division - Repl. of isolator assembly (Phase-I) DRF 2,74,98

404 Kharagpur Division - Repl. of power supply installation equipment DRF 1,00,00

405 Chakradharpur Division - Repl. of isolator assembly (Phase-II) DRF 1

406 Kharagpur-Bhadrak - Overhead equipment with aluminium feeder wire / auxilliary

catenary wire (high density route) (170 km)

DRF 1,00

407 Santragachi, Kolaghat, Hijli & Dalbhumgarh - Augmentation of traction sub-station by

3rd bay with 30/42 mva transformer

DRF 1,10

408 Asansol-Anara - Repl. of contact wire DRF 1

409 Chandil-Anara-Rukni & Bhojudih-Adra - Repl. of contact wire DRF 1

410 Works costing below Rs.2.5 crore each DRF 5,05,89

DF(3) 72,58

TOTAL-WORKS IN PROGRESS DRF 33,34,93

DF(3) 6,49,33

411 Howrah-Kharagpur-Tata - Mechanised stringing of overhead equipment (Phase-II)

(50 tkm)

DRF 1

412 Adra Division - Repl of contact & catenary wire (Phase-I) DRF 1

413 Works costing below Rs.2.5 crore each DRF 5

DF(3) 53,67

TOTAL-NEW WORKS DRF 7

DF(3) 53,67

TOTAL-Traction Distribution Works DRF 33,35,00

DF(3) 7,03,00

414 Haldia - Setting up of diesel multiple unit manufacturing factory Cap. 24,80,95

EBR ..

415 Shalimar - Two pit lines with catwalk & light emitting diode lighting arrangement DF(3) ..

416 Dangoaposi - Augmentation of sick line maintenance facilities DF(3) 1

417 Bondamunda - Second electric loco shed to home 200 electric locos Cap. 2,90,00

418 Tatanagar - Augmentation of electric loco shed for increasing holding from 120 to

150 locos

Cap. 51,00

TRACTION DISTRIBUTION WORKS

B - New Works

WORKSHOPS INCLUDING PRODUCTION UNITS

A - Works in Progress

8.1.21

SOUTH EASTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE

2014-15

AllocationParticulars

419 Padmapukur - Development of coaching maintenance facilities DF(3) 49,64

420 Santragachi - Reconstruction of catwalk & pit of NCG 1&2 with light emitting diode

lighting at coaching depot

DRF 1,55,00

421 Rourkela - Extension of washing pit line to cater 26-coach length trains DF(3) 1

422 Kharagpur Workshop - Modernisation Cap. 2,21,00

DRF 25,00

DF(3) 25,00

423 Bokaro - Setting up of electric loco shed to home 100 locos Cap. 2,30,00

C.Fund ..

424 Kharagpur Workshop - New ironite flooring DF(3) 1

425 Tatanagar - Augmentation of coaching maintenance facilities DF(3) 91,52

426 Hatia (Coaching Depot) - Integrated washing cum pit lines (26-coach length) (585 m)

(2 Nos)

DF(3) 3,50,00

427 Adityapur - New routine overhauling shed for air brake stock DF(3) 1,42,39

428 Bokaro Steel City - Extension of routine overhauling depot for maintenance of block

rake with covered shed

DF(3) 1,37,28

429 Santragachi - Extension of electric loco shed for homing 50 locomotives DF(3) 10,00

430 Bokaro Steel City - Upgradation of premium rake examination facilities at empty yard DF(3) 15,00

431 Bhojudih - Augmentation of sick line facilities at carriage & wagon examination point DF(3) 1,18,98

432 Bondamunda (Electric Loco Shed) - Extension at Chakradharpur end by 28.5 m to

increase loco holding to 175

Cap. 1,00,00

433 Tatanagar - Extension of wheel shop at centralised traction repair centre Cap. 1,02,83

434 Bokaro - Augumentation of old sick line with BOT crane facility DF(3) 1

435 Adityapur - Augmentation of sick line facilities for BOXN wagons & construction of

concrete pathway with welding & lighting arrangement

Cap. 23,00

436 Tatanagar (Electric Loco Shed) - Extension of heavy & light lifting bay and creation of

maintenance facilities for homing of WAG-9 locos

Cap. 1,60,00

437 Tikiapara - Extension of inspection/stabling pits, covered shed with lighting

arrangement and modification of car shed for maintenance of 12-car rakes

DF(3) 2,00,00

438 Kharagpur Workshop - Setting up of centre of excellence for wagon prototyping DF(3) ..

439 Anara (Adra) - Setting up of mid-life rehabilitiation workshop for coaches Cap. ..

440 Santragachi - Integrated sick line cum intermediate overhauling facilities Cap. 20,01

441 Padmapukur - Development of major coaching maintenence facilities DF(3) 5,06,00

442 Tata, Bokaro Steel City & Hatia - Development of satellite depots for maintenance of

track machines

DF(3) ..

443 Works costing below Rs.2.5 crore each DRF 99,99

DF(2) 6,00

DF(3) 3,84,25

TOTAL-WORKS IN PROGRESS Cap. 36,78,79

DRF 2,79,99

DF(2) 6,00

DF(3) 20,30,10

WORKSHOPS INCLUDING PRODUCTION UNITS

8.1.22

SOUTH EASTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE

2014-15

AllocationParticulars

444 Works costing below Rs.2.5 crore each Cap. 3,00

DRF 1

DF(3) 50

TOTAL-NEW WORKS Cap. 3,00

DRF 1

DF(3) 50

TOTAL-Workshops including Production Units Cap. 36,81,79

DRF 2,80,00

DF(2) 6,00

DF(3) 20,30,60

445 Manoharpur - Type-II - 11, Chakradharpur - type-III - 13 & type-II - 10, Dongaposi -

type-II - 5 & Rajgangpur - type-II - 9 & type-I - 18 units

Cap. 75,00

446 Dongaposi - Type-II - 63 & type-III - 12 units Cap. 44,94

447 Dongaposi - Type-II - 60 units Cap. 27,00

448 Adra - Repl. of quarters, type-II - 70 & type-III - 15 units DRF 2,26,12

449 Adra - Repl.of quarters, type-II - 93 units at North settlement DRF 1,80,00

450 Adra - Repl.of quarters, type-II - 93 units at East settlement DRF 1,80,00

451 Adra - Repl.of quarters, type-II - 93 units at South settlement DRF 1,70,00

452 Anara - Repl.of quarters, type-II - 69 & type-III - 15 units DRF 1,60,00

453 Adra - Repl.of quarters, type-II - 85 units at Seva Nagar colony DRF 1,60,00

454 Bokaro Steel City - Type-II - 50, type-III - 25, type-IV - 4 & type-V - 1 unit Cap. 3,20,61

455 Works costing below Rs.2.5 crore each Cap. 1,61,45

DRF 1,14,88

TOTAL-WORKS IN PROGRESS Cap. 6,29,00

DRF 11,91,00

456 Works costing below Rs.2.5 crore each Cap. ..

DRF ..

TOTAL-NEW WORKS Cap. ..

DRF ..

TOTAL-Staff Quarters Cap. 6,29,00

DRF 11,91,00

457 Garden Reach - Setting up of nursing college & hostel DF(2) ..

458 Chakradharpur - Improvement of water supply arrangement DF(2) 3,80

459 Kharagpur - Water treatment plant DF(2) 29,00

460 Santragachi, Kharagpur, Bondamunda, Dongaposi, Ranchi, Bhojudih & Anara -

Community halls

DF(2) 80,00

WORKSHOPS INCLUDING PRODUCTION UNITS

B - New Works

STAFF QUARTERS

A - Works in Progress

B - New Works

AMENITIES FOR STAFF

A - Works in Progress

8.1.23

SOUTH EASTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE

2014-15

AllocationParticulars

461 Ranchi - 50-bedded divisional hospital DF(2) 2,20,00

462 Ranchi - Laying of astro-turf with ancillary works at railway stadium DF(2) 1,24,37

463 Chakradharpur - Upgradation of divisional railway hospital DF(2) 1,80,00

464 Adra Division - Reinforced concrete cement overhead tanks for improved water

supply

DRF 40,00

465 Kharagpur - Upgradation of divisional hospital DF(2) 3,40,00

466 Kolkata - Upgradation incl haemodialysis centre at central hospital Garden Reach DF(2) 1,00,00

467 Ranchi-Hatia - Water supply arrangement with pipeline from Subarnarekha river to

Hatia incl intake well, pumphouse & comprehensive treatment plant

DF(1) 1,48,40

DF(2) 1,48,40

468 Works costing below Rs.2.5 crore each Cap. 5,00

DRF 7,31,00

DF(1) 2,78,89

DF(2) 6,71,05

DF(3) 1,00

TOTAL-WORKS IN PROGRESS Cap. 5,00

DRF 7,71,00

DF(1) 4,27,29

DF(2) 18,96,62

DF(3) 1,00

469 Works costing below Rs.2.5 crore each Cap. ..

DRF 1,00

DF(1) 1,00

TOTAL-NEW WORKS Cap. ..

DRF 1,00

DF(1) 1,00

TOTAL-Amenities for Staff Cap. 5,00

DRF 7,72,00

DF(1) 4,28,29

DF(2) 18,96,62

DF(3) 1,00

470 South Eastern Railway - Escalators at major stations (4 Nos) (2 station) DF(1) 64,00

471 Kharagpur - Shelters (platform Nos.1, 2, 3/4 & 5/6) DF(1) 69,00

472 Shalimar - Improvement of platform & shelter with passenger lines, extension of

platform, washable apron, extension of foot over bridge etc

DF(1) 24,00

473 Belda - Extension & raising of platform Nos.2, 3 & 4, raising of platform No.1 to high

level & covered shed and improvement to circulating area

DF(1) 7,14

474 Ranchi - Extension of shelter on balance portion of platform Nos.1, 2 & 3 and

renovation of surface of platform No.1

DF(1) 2,60,00

AMENITIES FOR STAFF

B - New Works

PASSENGER AMENITIES

A - Works in Progress

8.1.24

SOUTH EASTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE

2014-15

AllocationParticulars

475 Hatia - Extension of shelter on balance portion of platform Nos.1, 2 & 3 and

renovation of surface for 24-coach trains

DF(1) 90,00

476 Kharagpur Division - Full length platform shelter (12 C-class stations) DF(1) 5,50,00

477 Santragachi-Amta, Panskura-Haldia & Balichak-Midnapore - Upgradation of

suburban stations (16, 13 & 6 Nos respectively)

DF(1) 15,00

478 Hijli - Development of modern station building with passenger amenities, circulating

area etc.

DF(1) 3,50,00

479 Works costing below Rs.2.5 crore each DRF 3,47,99

DF(1) 38,47,10

DF(2) 9,85

DF(3) 1,00

TOTAL-WORKS IN PROGRESS DRF 3,47,99

DF(1) 52,76,24

DF(2) 9,85

DF(3) 1,00

480 Works costing below Rs.2.5 crore each DRF 1,00

DF(1) 1,00

TOTAL-NEW WORKS DRF 1,00

DF(1) 1,00

TOTAL-Passenger Amenities DRF 3,48,99

DF(1) 52,77,24

DF(2) 9,85

DF(3) 1,00

481 South Eastern Railway - Integrated security system (11 stations) Cap. 15,00,00

482 Banspani, Anara, Chakradharpur & Rourkela - Upgradation of running rooms Cap. 20,00

483 Sini (Zonal Railway Training Institute) - Repl. of barrack type accommodation by 280-

bedded hostel

DRF 2,82,00

484 Tatanagar (Electrical Loco Training Centre) - 200-bedded new hostel building (2nd

wing)

DF(3) 1,20,00

485 Kharagpur - Advanced railway loco pilot training centre DF(3) 50

486 Kharagpur - New 72-beded running room for drivers & guards DF(3) 50

487 Kharagpur - Upgradation/development of Railway Protection Force training centre DF(3) 20,00

488 South Eastern Railway - Boundary wall / fencing to prevent encroachment on railway

land (PB 821/2012-13/NR)

DF(3) 14,46

489 Works costing below Rs.2.5 crore each Cap. 2,19,00

DRF 23,00

DF(1) 1,31,57

DF(2) 1,56,04

DF(3) 7,04,22

DF(4) 91,70

PASSENGER AMENITIES

B - New Works

OTHER SPECIFIED WORKS

A - Works in Progress

8.1.25

SOUTH EASTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE

2014-15

AllocationParticulars

TOTAL-WORKS IN PROGRESS Cap. 17,39,00

DRF 3,05,00

DF(1) 1,31,57

DF(2) 1,56,04

DF(3) 8,59,68

DF(4) 91,70

490 Works costing below Rs.2.5 crore each Cap. 1,00

DRF 4,00

DF(3) 10,00

TOTAL-NEW WORKS Cap. 1,00

DRF 4,00

DF(3) 10,00

TOTAL-Other Specified Works Cap. 17,40,00

DRF 3,09,00

DF(1) 1,31,57

DF(2) 1,56,04

DF(3) 8,69,68

DF(4) 91,70

TOTAL-WORKS IN PROGRESS Cap. 378,18,79

C.Fund 454,76,00

DRF 406,43,49

DF(1) 60,35,10

DF(2) 20,70,11

DF(3) 67,91,98

DF(4) 18,28,81

S.Fund 58,89,19

Dep(RVN) ..

EBR 31,60,00

TOTAL - NEW WORKS Cap. 5,00

DRF 34,23,50

DF(1) 3,00

DF(2) 3,61

DF(3) 71,17

DF(4) ..

S.Fund 29,51

GRAND TOTAL Cap. 378,23,79

C.Fund 454,76,00

DRF 440,66,99

DF(1) 60,38,10

DF(2) 20,73,72

DF(3) 68,63,15

DF(4) 18,28,81

S.Fund 59,18,70

Dep(RVN) 0

EBR 31,60,00

B - New Works

8.2.1

SOUTH EASTERN RAILWAY

MACHINERY AND PLANT PROGRAM FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15

491 Khagarpur Workshop - Horizontal boring machine spindle (dia 130 mm) DRF 1

492 CNC surface wheel lathes DRF 1

493 Tata - Simulator in motion type for electric loco Cap. 1

494 Kharagpur - CNC surface wheel lathes DRF 3,69,66

495 Kharagpur - Simulators in motion type DRF 1

496 System of online monitoring of rolling stock (OMRS) (8 Nos) DF(3) ..

497 Tatanagar - CNC surface wheel lathe Cap. 3,69,66

498 Kharagpur Workshop - CNC verticle turret lathe DRF 1

499 Bokaro Steel City - CNC surface wheel lathe DRF 3,85,53

500 Tata - CNC underfloor wheel lathe (broad / metre gauge) DRF 1

501 Kharagpur Workshop - Wheel press (500 ton) (broad & metre gauge) (hydraulic type) DRF 1

502 Adityapur - CNC surface wheel lathe Cap. 1

503 Bondamunda - CNC surface wheel lathe Cap. 1

504 Santragachi Jn - Underfloor wheel lathe Cap. 1

505 Sini - Plate Straightening Machine, (capacity maximum thickness of plate 40 mm &

minimum thickness of plate 8mm, Width of plate 2550 mm.)

Cap. 1

506 Bandamunda - Wheel impact Load Detector DF(3) 1

507 Kharagpur - Wheel impact Load Detector DF(3) 1

508 Kharagpur - Wheel Lathe Under Floor DRF 4,71,16

509 Tikiapara - Wheel Lathe Under Floor Cap. 1

510 Works costing below Rs.2.5 crore each Cap. 84,12

DRF 4,18,64

DF(2) 1,62,85

DF(3) 65,24

TOTAL-PROGRAMMED DELIVERIES Cap. 4,53,84

DRF 16,45,05

DF(2) 1,62,85

DF(3) 65,26

511 Nimpura - CNC Surface Wheel Lathe DRF 1

512 Works costing below Rs.2.5 crore each Cap. 1

DRF 10

DF(2) 10

DF(3) 10

TOTAL-NEW ACQUISITION Cap. 1

DRF 11

DF(2) 10

DF(3) 10

TOTAL-Machinery & Plant Cap. 4,53,85

DRF 16,45,16

DF(2) 1,62,95

DF(3) 65,36

B - NEW ACQUISITION

AllocationParticulars

A - PROGRAMMED DELIVERIES