BOND ISSUE NOVEMBER 8, 2016 -- LIST OF PROJECTSITEM BUILDING AND SITE INFRASTRUCTURE ESTIMATED COST
1 Roof and EFIS replacement at OBMS, BHS, South, and North. 2,455,164
1a - OBMS: Replace entire roof and replacement or repair of identified sections of EFIS. 1,367,280
1b - BHS: Replace remaining ballasted EPDM roof sections. 819,720
1c - North: Replace remaining ballasted EPDM roof sections. 146,124
1d - South: Replace remaining ballasted EPDM roof sections. 122,040
2 Exterior doors and window panel replacement at North, South, and OBMS. 391,230
2a - North: Replace west wing window panel sections. 54,000
2b - South: Replace window panel sections on west, south, and east sides of building. 100,710
2c - OBMS: Replace all exterior windows and doors. 236,520
3 BHS science classroom renovation and casework replacement to BHS family and consumer science classrooms and vocal music classroom. 784,728
3a - Renovation of science classrooms (5), flex lab (1) to include new plumbing (supply and drain), gas lines, student workstations, teacher workstations, safety apparatus (chemical shower, emergency supply shut-off, direct vent hoods), gas and plumbing fixtures, and room finishes.
449,280
3b - Replacement of science classroom casework including equipment storage, chemical storage, teacher office area storage, and flex lab storage. Also includes replacement of casework and storage in FCS classrooms (2) and Vocal classroom (1).
335,448
TOTAL BUILDING AND SITE INFRASTRUCTURE 3,631,122
ITEM SAFETY AND SECURITY ESTIMATED COST
4 Attendance center security systems and safety updates. 216,000
4a - Arbor Park: Install surveillance cameras and controllers, building-wide mass notification/activation systems, secure door control systems, and fire/security panel updates. 43,200
4b - BHS: Update surveillance cameras and controllers, building-wide mass notification/activation systems, secure door control systems, and fire/security panel updates. 90,720
4c - North: Install surveillance cameras and controllers, building-wide mass notification/activation systems, secure door control systems, and fire/security panel updates. 35,640
4d - OBMS: Install surveillance cameras and controllers, building-wide mass notification/activation systems, secure door control systems, and fire/security panel updates. 34,560
4e - South: Install surveillance cameras and controllers, building-wide mass notification/activation systems, secure door control systems, and fire/security panel updates. 11,880
5 Classroom door locks, doors, frames, and hardware upgrades. 140,184
5a - Arbor Park: Install door frames, doors, door locks, hardware; upgrade door locks and hardware. 50,760
5b - BHS: Upgrade door locks and hardware. 38,880
5c - North: Upgrade door locks and hardware. 12,960
5d - OBMS: Upgrade door locks and hardware. 25,920
5e - South: Upgrade door locks and hardware. 11,664
6 Bleacher replacement in main gym at Blair High School. 259,2006a - Replacement of all lower and upper bleachers to include structure, seating, bracing, motors and controllers, with ADA access, seating, and railing, and demolition/removal. 259,200
TOTAL SAFETY AND SECURITY 615,384
ITEM BUILDING SYSTEMS ESTIMATED COST
7 HVAC replacement at BHS, OBMS, AP, North, and South. 5,217,264
7a - Arbor Park: Replacement of water-cooled chiller to include water piping, pumps, valves, electrical, controls, and demolition/removal; installation of mini-split heat pumps (office zone only); replacement of heat control valves for all building zones.
390,960
7b - BHS: Replacement of thirteen (13) multi-zoned roof-top HVAC penthouses (54 individual units) to include gas piping, refrigerant piping, ductwork, electrical, controls, and demolition/removal. 3,758,724
7c - North: Replacement of four (4) classroom unit ventilators/condensers with roof-top HVAC units to electrical, gas piping, ductwork, controls, fin-tube control valves, and demolition/removal. 151,200
7d - OBMS: Replacement of fluid cooler to include intake and exhaust dampers, piping, valves, electrical, controls, and demolition/removal; replacement of seven (7) ceiling-mounted heat pumps to include piping, ductwork, electrical, controls, and demolition/removal; installation of roof-top gym HVAC unit to include refrigerant piping, ductwork, condenser, electrical, and controls.
341,628
7e - South: Replacement of ten (10) classroom unit ventilators/condensers with roof-top HVAC units to include electrical, gas piping, ductwork, controls, fin-tube control valves, and demolition/removal; replacement of one (1) multi-zone HVAC unit to include gas piping, refrigerant piping, ductwork, electrical, controls, and demolition/removal.
574,752
8 Electrical panel and switchgear replacement at Blair High School 637,200
8a - Replacement of electrical panels and circuit breakers in the main electrical service area; replacement of selected branch circuit electrical panels in other identified areas (food service, auditorium, academic wings).
637,200
9 Restroom fixture and plumbing replacement at Arbor Park, Bus Barn, BHS, North, and South. 268,056
9a - Arbor Park: Replace portions, fixtures, finishes, and above grade supply/waste lines as needed. 69,984
9b - Bus Barn: Remove existing staff restrooms and install new. 69,120
9c - BHS: Replace portions, fixtures, finishes, and above grade supply/waste lines as needed. 97,200
9d - North: Replace portions, fixtures, finishes, and above grade supply/waste lines as needed. 16,200
9e - South: Replace portions, fixtures, finishes, and above grade supply/waste lines as needed. 15,552
10 Data and networking updates upgrades. 92,880
10a - Arbor Park: Upgrade of wireless access points, controllers, and network switchgear. 21,600
10b - BHS: Upgrade of wireless access points, controllers, and network switchgear. 37,800
10c - Krantz Field: Upgrade of network connectivity, wireless access points, controllers, and network switchgear. 14,040
10d - North: Upgrade of wireless access points, controllers, and network switchgear. 4,320
10e - OBMS: Upgrade of wireless access points, controllers, and network switchgear. 10,800
10f - South: Upgrade of wireless access points, controllers, and network switchgear. 4,320
TOTAL BUILDING SYSTEMS 6,215,400
TOTAL COST BY FOCUS AREA ESTIMATED COSTBUILDING AND SITE INFRASTRUCTURE 3,631,122
SAFETY AND SECURITY 615,384
BUILDING SYSTEMS 6,215,400
TOTAL 10,461,906