item c division of highways raleigh n.c ......2003/09/16  · north carolina department of...

24
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS RALEIGH N.C. SEPTEMBER 16, 2003 ITEM C HIGHWAY LETTING PAGE : 1 of 24 DIVISION 00001 34563.3.3 NHS-17(28) PASQUOTANK R-3850 PROPOSAL LENGTH 1.036 KILOMETERS TYPE OF WORK INTERCHANGE CONST, GRADING, DRAINAGE, PAVING & STR. LOCATION US-17 & SR-1140 (OKISKO RD). EST CONST PROGRESS.... FY-2004..49% OF BID FY-2005..47% OF BID FY-2006..04% OF BID RPN 002 C200723 3 BIDDER(S) DBE GOAL 10.00 % ESTIMATE 7,544,162.60 DATE AVAILABLE NOV 03 2003 INTER COMPLETION SEP 01 2005 COMPLETE ALL WORK EXCEPT PLANTING/REFORESTATION FINAL COMPLETION DEC 31 2005 $ TOTALS % DIFF 7,669,459.48 +1.7 BARNHILL CONTRACTING CO. TARBORO, NC 8,204,563.15 +8.8 * W. C. ENGLISH, INC. LYNCHBURG, VA * CHANGE IMPROPERLY MADE * USED CORRECTION FLUID 9,952,783.66 +31.9 R. P. C. CONTRACTING, INC. KITTY HAWK, NC * DENOTES IRREGULAR BID

Upload: others

Post on 24-Jan-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ITEM C DIVISION OF HIGHWAYS RALEIGH N.C ......2003/09/16  · NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS RALEIGH N.C. SEPTEMBER 16, 2003 ITEM C HIGHWAY LETTING

NORTH CAROLINA DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS

RALEIGH N.C.SEPTEMBER 16, 2003

ITEM CHIGHWAY LETTING PAGE : 1 of 24

DIVISION 00001

34563.3.3NHS-17(28)PASQUOTANKR-3850

PROPOSAL LENGTH 1.036 KILOMETERS

TYPE OF WORK INTERCHANGE CONST, GRADING, DRAINAGE, PAVING & STR.

LOCATION US-17 & SR-1140 (OKISKO RD).

EST CONST PROGRESS.... FY-2004..49% OF BIDFY-2005..47% OF BIDFY-2006..04% OF BID

RPN 002 C200723 3 BIDDER(S) DBE GOAL 10.00 %ESTIMATE 7,544,162.60

DATE AVAILABLE NOV 03 2003INTER COMPLETION SEP 01 2005 COMPLETE ALL WORK EXCEPT PLANTING/REFORESTATIONFINAL COMPLETION DEC 31 2005

$ TOTALS % DIFF7,669,459.48 +1.7BARNHILL CONTRACTING CO. TARBORO, NC8,204,563.15 +8.8* W. C. ENGLISH, INC. LYNCHBURG, VA

* CHANGE IMPROPERLY MADE* USED CORRECTION FLUID

9,952,783.66 +31.9R. P. C. CONTRACTING, INC. KITTY HAWK, NC

* DENOTES IRREGULAR BID

Page 2: ITEM C DIVISION OF HIGHWAYS RALEIGH N.C ......2003/09/16  · NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS RALEIGH N.C. SEPTEMBER 16, 2003 ITEM C HIGHWAY LETTING

NORTH CAROLINA DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS

RALEIGH N.C.SEPTEMBER 16, 2003

ITEM CHIGHWAY LETTING PAGE : 2 of 24

DIVISION 00003

34592.3.1STP-421(27)SAMPSONR-4031

PROPOSAL LENGTH 6.800 MILES

TYPE OF WORK MEDIAN GUARDRAIL, GUIDERAIL & SIGNING.

LOCATION US-421 & US-701 FROM US-701 BUSINESS TO SR-1934.

EST CONST PROGRESS.... FY-2004..80% OF BIDFY-2005..20% OF BID

RPN 003 C200902 1 BIDDER(S) DBE GOAL 3.00 %ESTIMATE 614,043.87

DATE AVAILABLE NOV 03 2003INTER COMPLETION COMPLETE ALL GUIDERAIL & GUARDRAIL WORK 120 DAYS AFTER STARTFINAL COMPLETION NOV 01 2004

$ TOTALS % DIFF681,613.15 +11.0ELDERLEE, INC. OAKS CORNERS, NY

Page 3: ITEM C DIVISION OF HIGHWAYS RALEIGH N.C ......2003/09/16  · NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS RALEIGH N.C. SEPTEMBER 16, 2003 ITEM C HIGHWAY LETTING

PAGE: 3 OF 24 ITEM C

JULY 15 2003 LETTING

34592.3.1STP-421(27)SAMPSONR-4031RPN 004

MEDIAN GUARDRAIL, GUIDERAIL & SIGNING.

DATE AVAILABLE SEP 02 2003INTER COMPLETION COMPLETE ALL GUIDERAIL & GUARDRAIL WORK 120 DAYS AFTER STARTFINAL COMPLETION SEP 01 2004

ENGINEER’S ESTIMATE$614,043.87

$ TOTALS % DIFFELDERLEE, INC. OAKS CORNERS, NY 676,266.10 +10.1

SEPTEMBER 16 2003 LETTING

34592.3.1STP-421(27)SAMPSONR-4031RPN 003

MEDIAN GUARDRAIL, GUIDERAIL & SIGNING.

DATE AVAILABLE NOV 03 2003INTER COMPLETION COMPLETE ALL GUIDERAIL & GUARDRAIL WORK 120 DAYS AFTER STARTFINAL COMPLETION NOV 01 2004

ENGINEER’S ESTIMATE$614,043.87

$ TOTALS % DIFFELDERLEE, INC. OAKS CORNERS, NY 681,613.15 +11.0

Page 4: ITEM C DIVISION OF HIGHWAYS RALEIGH N.C ......2003/09/16  · NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS RALEIGH N.C. SEPTEMBER 16, 2003 ITEM C HIGHWAY LETTING

NORTH CAROLINA DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS

RALEIGH N.C.SEPTEMBER 16, 2003

ITEM CHIGHWAY LETTING PAGE : 4 of 24

DIVISION 00004

33087.3.2BRSTP-1426(3)HALIFAXB-3468

PROPOSAL LENGTH 0.154 MILES

TYPE OF WORK GRADING, DRAINAGE, PAVING & STRUCTURE.

LOCATION BRIDGE OVER CHOCKOYOTTE CREEK & APPROACHES SR-1426.

EST CONST PROGRESS.... FY-2004..100% OF BID

RPN 004 C200688 3 BIDDER(S) DBE GOAL 10.00 %ESTIMATE 590,717.73

DATE AVAILABLE NOV 03 2003 THRU MAR 15 2004FINAL COMPLETION 190 DAY(S) AFTER START DATE

$ TOTALS % DIFF630,432.46 +6.7ATWELL CONSTRUCTION CO., INC. GREENVILLE, NC676,817.84 +14.6S. T. WOOTEN CORPORATION WILSON, NC717,523.66 +21.5D. W. LYLE CORPORATION MCKENNEY, VA

Page 5: ITEM C DIVISION OF HIGHWAYS RALEIGH N.C ......2003/09/16  · NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS RALEIGH N.C. SEPTEMBER 16, 2003 ITEM C HIGHWAY LETTING

NORTH CAROLINA DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS

RALEIGH N.C.SEPTEMBER 16, 2003

ITEM CHIGHWAY LETTING PAGE : 5 of 24

DIVISION 00005

32964.3.2BRZ-1649(1)WAKEB-3259

PROPOSAL LENGTH 0.958 KILOMETERS

TYPE OF WORK GRADING, DRAINAGE, PAVING & STRUCTURES.

LOCATION BRIDGE OVER TURKEY CREEK & BRIDGE OVER CRABTREE CREEK ANDAPPROACHES ON SR-1649.

EST CONST PROGRESS.... FY-2004..77% OF BIDFY-2005..23% OF BID

RPN 005 C200751 3 BIDDER(S) DBE GOAL 10.00 %ESTIMATE 1,792,596.82

DATE AVAILABLE NOV 03 2003INTER COMPLETION NOV 15 2004 COMPLETE ALL WORK EXCEPT PLANTING/REFORESTATIONFINAL COMPLETION DEC 31 2004

$ TOTALS % DIFF1,945,002.95 +8.5S. T. WOOTEN CORPORATION WILSON, NC1,993,446.11 +11.2BLYTHE CONSTRUCTION, INC. CHARLOTTE, NC2,004,009.63 +11.8C. C. MANGUM CONTRACTORS, LLC RALEIGH, NC

Page 6: ITEM C DIVISION OF HIGHWAYS RALEIGH N.C ......2003/09/16  · NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS RALEIGH N.C. SEPTEMBER 16, 2003 ITEM C HIGHWAY LETTING

NORTH CAROLINA DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS

RALEIGH N.C.SEPTEMBER 16, 2003

ITEM CHIGHWAY LETTING PAGE : 6 of 24

DIVISION 00005

33137.3.2BRZ-2006(2)WAKEB-3529

PROPOSAL LENGTH 0.354 MILES

TYPE OF WORK GRADING, DRAINAGE, PAVING & STRUCTURE.

LOCATION BRIDGE OVER PERRY CREEK AND APPROACHES ON SR-2006.

EST CONST PROGRESS.... FY-2004..53% OF BIDFY-2005..46% OF BIDFY-2006..01% OF BID

RPN 006 C200700 1 BIDDER(S) DBE GOAL 10.00 %ESTIMATE 1,941,001.43

DATE AVAILABLE NOV 03 2003FINAL COMPLETION JUL 15 2005

$ TOTALS % DIFF2,251,260.41 +16.0S. T. WOOTEN CORPORATION WILSON, NC

Page 7: ITEM C DIVISION OF HIGHWAYS RALEIGH N.C ......2003/09/16  · NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS RALEIGH N.C. SEPTEMBER 16, 2003 ITEM C HIGHWAY LETTING

NORTH CAROLINA DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS

RALEIGH N.C.SEPTEMBER 16, 2003

ITEM CHIGHWAY LETTING PAGE : 7 of 24

DIVISION 00005

33954.2.2STP-0520(16)WAKEE-3806AA

PROPOSAL LENGTH 2.278 MILES

TYPE OF WORK PEDESTRIAN BRIDGE.

LOCATION REEDY CREEK GREENWAY FROM NC ART MUSEUM TO MEREDITH COLLEGE INRALEIGH.

EST CONST PROGRESS.... FY-2004..77% OF BIDFY-2005..23% OF BID

RPN 007 C200769 6 BIDDER(S) DBE GOAL 3.00 %ESTIMATE 3,693,272.77

DATE AVAILABLE NOV 03 2003FINAL COMPLETION NOV 15 2004

$ TOTALS % DIFF3,811,264.00 +3.2C. C. MANGUM CONTRACTORS, LLC RALEIGH, NC4,328,502.63 +17.2S. T. WOOTEN CORPORATION WILSON, NC4,372,408.55 +18.4BLYTHE CONSTRUCTION, INC. CHARLOTTE, NC4,462,237.50 +20.8DANE CONSTRUCTION, INC. MOORESVILLE, NC4,977,224.25 +34.8* W. C. ENGLISH, INC. LYNCHBURG, VA

* CHANGE IMPROPERLY MADE* USED CORRECTION FLUID

5,757,536.85 +55.9CROWDER CONSTRUCTION COMPANY CHARLOTTE, NC

* DENOTES IRREGULAR BID

Page 8: ITEM C DIVISION OF HIGHWAYS RALEIGH N.C ......2003/09/16  · NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS RALEIGH N.C. SEPTEMBER 16, 2003 ITEM C HIGHWAY LETTING

NORTH CAROLINA DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS

RALEIGH N.C.SEPTEMBER 16, 2003

ITEM CHIGHWAY LETTING PAGE : 8 of 24

DIVISION 00006

33121.3.1BRZ-1303(4)ROBESONB-3507

PROPOSAL LENGTH 0.227 MILES

TYPE OF WORK GRADING, DRAINAGE, PAVING & STRUCTURES.

LOCATION BRIDGES OVER LUMBER RIVER & OVERFLOW & APPROACHES ON SR-1303.

EST CONST PROGRESS.... FY-2004..40% OF BIDFY-2005..60% OF BID

RPN 008 C200706 4 BIDDER(S) DBE GOAL 9.00 %ESTIMATE 1,043,236.26

DATE AVAILABLE MAY 01 2004FINAL COMPLETION NOV 30 2004

$ TOTALS % DIFF1,057,994.60 +1.4S. T. WOOTEN CORPORATION WILSON, NC1,074,585.35 +3.0DANE CONSTRUCTION, INC. MOORESVILLE, NC1,178,405.82 +13.0CAROLINA BRIDGE COMPANY, INC. ORANGEBURG, SC1,183,838.23 +13.5DELLINGER, INC. MONROE, NC

Page 9: ITEM C DIVISION OF HIGHWAYS RALEIGH N.C ......2003/09/16  · NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS RALEIGH N.C. SEPTEMBER 16, 2003 ITEM C HIGHWAY LETTING

NORTH CAROLINA DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS

RALEIGH N.C.SEPTEMBER 16, 2003

ITEM CHIGHWAY LETTING PAGE : 9 of 24

DIVISION 00006

6R.2078STATE FUNDEDROBESON

PROPOSAL LENGTH 18.420 MILES

TYPE OF WORK MILLING, RESURFACING, SHOULDER RECONST & PVMT MARKINGS.

LOCATION 10 SECTIONS OF SECONDARY ROADS.

EST CONST PROGRESS.... FY-2004..100% OF BID

RPN 009 C200884 2 BIDDER(S) MBE GOAL 8.00 % WBE GOAL 4.00%ESTIMATE 901,726.75

DATE AVAILABLE NOV 03 2003FINAL COMPLETION JUN 01 2004

$ TOTALS % DIFF978,576.80 +8.5COASTAL CAROLINA DIVISION OF APAC-ATLANTIC, INC. KINSTON, NC984,988.10 +9.2BARNES PAVING CO., INC. LUMBERTON, NC

Page 10: ITEM C DIVISION OF HIGHWAYS RALEIGH N.C ......2003/09/16  · NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS RALEIGH N.C. SEPTEMBER 16, 2003 ITEM C HIGHWAY LETTING

NORTH CAROLINA DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS

RALEIGH N.C.SEPTEMBER 16, 2003

ITEM CHIGHWAY LETTING PAGE : 10 of 24

DIVISION 00007

33033.3.2BRZ-1921(4)ALAMANCEB-3401

PROPOSAL LENGTH 0.340 MILES

TYPE OF WORK GRADING, DRAINAGE, PAVING & STRUCTURE.

LOCATION BRIDGE OVER QUAKER CREEK AND APPROACHES ON SR-1921.

EST CONST PROGRESS.... FY-2004..80% OF BIDFY-2005..20% OF BID

RPN 010 C200733 5 BIDDER(S) DBE GOAL 10.00 %ESTIMATE 1,085,607.87

DATE AVAILABLE NOV 03 2003FINAL COMPLETION NOV 15 2004

$ TOTALS % DIFF1,115,691.20 +2.8DELLINGER, INC. MONROE, NC1,186,741.86 +9.3DANE CONSTRUCTION, INC. MOORESVILLE, NC1,188,441.51 +9.5R. E. BURNS & SONS CO., INC. STATESVILLE, NC1,238,856.53 +14.1HAYMES BROTHERS, INC. CHATHAM, VA1,271,730.84 +17.1CAROLINA BRIDGE COMPANY, INC. ORANGEBURG, SC

Page 11: ITEM C DIVISION OF HIGHWAYS RALEIGH N.C ......2003/09/16  · NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS RALEIGH N.C. SEPTEMBER 16, 2003 ITEM C HIGHWAY LETTING

NORTH CAROLINA DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS

RALEIGH N.C.SEPTEMBER 16, 2003

ITEM CHIGHWAY LETTING PAGE : 11 of 24

DIVISION 00007

33155.3.1BRSTP-2158(2)ALAMANCEB-3601

PROPOSAL LENGTH 0.445 MILES

TYPE OF WORK GRADING, DRAINAGE, PAVING & STRUCTURE.

LOCATION BRIDGE OVER HAW RIVER AND APPROACHES ON SR-2158.

EST CONST PROGRESS.... FY-2004..49% OF BIDFY-2005..47% OF BIDFY-2006..04% OF BID

RPN 011 C200765 8 BIDDER(S) DBE GOAL 10.00 %ESTIMATE 3,107,479.10

DATE AVAILABLE NOV 03 2003INTER COMPLETION SEP 01 2005 COMPLETE ALL WORK EXCEPT PLANTING/REFORESTATIONFINAL COMPLETION DEC 31 2005

$ TOTALS % DIFF3,038,945.12 -2.2DANE CONSTRUCTION, INC. MOORESVILLE, NC3,065,834.00 -1.3* W. C. ENGLISH, INC. LYNCHBURG, VA

* CHANGE IMPROPERLY MADE* USED CORRECTION FLUID

3,209,138.94 +3.3BLYTHE CONSTRUCTION, INC. CHARLOTTE, NC3,272,091.90 +5.3DELLINGER, INC. MONROE, NC3,291,716.61 +5.9D. W. LYLE CORPORATION MCKENNEY, VA3,312,311.97 +6.6SLOAN CONSTRUCTION CO., INC. GREENVILLE, SC3,493,203.89 +12.4TRIANGLE GRADING & PAVING, INC. BURLINGTON, NC3,668,985.32 +18.1HAYMES BROTHERS, INC. CHATHAM, VA

* DENOTES IRREGULAR BID

Page 12: ITEM C DIVISION OF HIGHWAYS RALEIGH N.C ......2003/09/16  · NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS RALEIGH N.C. SEPTEMBER 16, 2003 ITEM C HIGHWAY LETTING

HIGHWAY LETTING PAGE: 12 OF 24 NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ITEM C

DIVISION OF HIGHWAYSRALEIGH NCSEP 16 2003

DIVISION 00007

33088.0.1, 33083.3.1

BRZ-2819(2)GUILFORDB-3463, B-3647, B-3648

PROPOSAL LENGTH 0.642 MILES

TYPE OF WORK DESIGN BUILD / GRADING, DRAINAGE, PAVING & STRUCTURE.

LOCATION BRIDGES OVER SOUTH & NORTH BUFFALO CREEK & APPROACHES ON SR-2819, SR-2770 & SR-2784.

EST CONST PROGRESS…. FY-2004..47% OF BIDFY-2005..45% OF BIDFY-2006..08% OF BID

RPN 023 C200748 3 BIDDERS DBE GOAL 10.00%ESTIMATE 3,846,500.00

DATE AVAILABLE NOV 03 2003FINAL COMPLETION OCT 15 2005

$ TOTALS % DIFFSMITH-ROWE MOUNT AIRY, NC 4,037,624.61 +5.0S. T. WOOTEN WILSON, NC 4,648,000.00 +20.8CROWDER CONST CO CHARLOTTE, NC 4,900,000.00 +27.4

QUALITY ADJUSTED PRICE RANKING

PROPOSAL TECH QUALITY LINE ITEM QUALITY LINE ITEM ADJUSTED SCORE CREDIT % #2 AMT VALUE #1 AMT PRICE

(CONT AWD BASIS)

SMITH-ROWE 84 11.67 3,053,747.82 356,372.37 983,876.79 3,681,252.24S. T. WOOTEN 88 15.00 3,871,000.00 580,650.00 777,000.00 4,067,350.00CROWDER 89 15.83 4,300,000.00 680,690.00 600,000.00 4,219,310.00

PROPOSAL PROPOSED COMPLETION DATE

SMITH-ROWE JUN 15 2004S. T. WOOTEN APR 01 2005CROWDER CONST CO NOV 12 2004

Page 13: ITEM C DIVISION OF HIGHWAYS RALEIGH N.C ......2003/09/16  · NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS RALEIGH N.C. SEPTEMBER 16, 2003 ITEM C HIGHWAY LETTING

NORTH CAROLINA DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS

RALEIGH N.C.SEPTEMBER 16, 2003

ITEM CHIGHWAY LETTING PAGE : 13 of 24

DIVISION 00007

34293.3.1ITS-32NC(001)ALAMANCE, GUILFORDM-351

PROPOSAL LENGTH 10.750 MILES

TYPE OF WORK ITS.

LOCATION I-85 / I-40 CORRIDOR INTEGRATION OF TRIAD REGIONAL TMC & CITY OFBURLINGTON'S REGIONAL CAMERA SYSTEM.

EST CONST PROGRESS.... FY-2004..89% OF BIDFY-2005..11% OF BID

RPN 012 C200770 5 BIDDER(S) DBE GOAL 0.00 %ESTIMATE 980,370.00

DATE AVAILABLE NOV 03 2003FINAL COMPLETION SEP 01 2004

$ TOTALS % DIFF762,762.00 -22.2TRAFFIC CONTROL DEVICES, INC. ALTAMONTE SPRNGS, FL823,567.13 -16.0WORLD FIBER TECHNOLOGIES, INC. ALPHARETTA, GA854,792.59 -12.8* VIASYS SERVICES, INC. LAKELAND, FL

* BID EXECUTED IMPROPERLY* SEAL NOT LEGIBLE

891,968.00 -9.0TRANS TECH ELECTRIC, L. P. SOUTH BEND, IN996,996.96 +1.7MASTEC NORTH AMERICA, INC. WOODSTOCK, GA

* DENOTES IRREGULAR BID

Page 14: ITEM C DIVISION OF HIGHWAYS RALEIGH N.C ......2003/09/16  · NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS RALEIGH N.C. SEPTEMBER 16, 2003 ITEM C HIGHWAY LETTING

NORTH CAROLINA DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS

RALEIGH N.C.SEPTEMBER 16, 2003

ITEM CHIGHWAY LETTING PAGE : 14 of 24

DIVISION 00007

36483, 36484STATE FUNDEDALAMANCE, GUILFORD

PROPOSAL LENGTH 2.738 MILES

TYPE OF WORK GRADING, MILLING, RESURFACING & GUARDRAIL.

LOCATION US-70 FROM WEST OF WESTBROOK AVE TO NC-100 AND SR-2748 AT THEINTERSECTION WITH US-70.

EST CONST PROGRESS.... FY-2004..64% OF BIDFY-2005..36% OF BID

RPN 013 C200879 2 BIDDER(S) MBE GOAL 5.00 % WBE GOAL 3.00%ESTIMATE 777,683.80

DATE AVAILABLE APR 01 2004FINAL COMPLETION SEP 30 2004

$ TOTALS % DIFF849,688.71 +9.3LARCO CONSTRUCTION, A DIV. OF NELLO L. TEER CO. WINSTON-SALEM, N955,455.01 +22.9THOMPSON ARTHUR DIVISION OF APAC-ATLANTIC, INC. GREENSBORO, N

Page 15: ITEM C DIVISION OF HIGHWAYS RALEIGH N.C ......2003/09/16  · NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS RALEIGH N.C. SEPTEMBER 16, 2003 ITEM C HIGHWAY LETTING

NORTH CAROLINA DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS

RALEIGH N.C.SEPTEMBER 16, 2003

ITEM CHIGHWAY LETTING PAGE : 15 of 24

DIVISION 00008

33180.3.1BRZ-1009(12)CHATHAMB-3632

PROPOSAL LENGTH 0.179 MILES

TYPE OF WORK GRADING, DRAINAGE, PAVING & STRUCTURE.

LOCATION BRIDGE OVER BEAR CREEK AND APPROACHES ON SR-1009.

EST CONST PROGRESS.... FY-2004..80% OF BIDFY-2005..20% OF BID

RPN 014 C200766 5 BIDDER(S) DBE GOAL 10.00 %ESTIMATE 655,676.60

DATE AVAILABLE NOV 03 2003FINAL COMPLETION NOV 01 2004

$ TOTALS % DIFF681,656.26 +4.0DANE CONSTRUCTION, INC. MOORESVILLE, NC705,924.15 +7.7S. T. WOOTEN CORPORATION WILSON, NC713,421.62 +8.8R. E. BURNS & SONS CO., INC. STATESVILLE, NC733,049.46 +11.8CROWDER CONSTRUCTION COMPANY CHARLOTTE, NC821,993.50 +25.4DELLINGER, INC. MONROE, NC

Page 16: ITEM C DIVISION OF HIGHWAYS RALEIGH N.C ......2003/09/16  · NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS RALEIGH N.C. SEPTEMBER 16, 2003 ITEM C HIGHWAY LETTING

NORTH CAROLINA DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS

RALEIGH N.C.SEPTEMBER 16, 2003

ITEM CHIGHWAY LETTING PAGE : 16 of 24

DIVISION 00009

32951.3.2BRSTP-2200(2)ROWANB-3236

PROPOSAL LENGTH 0.161 MILES

TYPE OF WORK GRADING, DRAINAGE, PAVING & STRUCTURE.

LOCATION BRIDGE OVER NORFOLK SOUTHERN CORPORATION & APPROACHES ON SR-2200(EAST INNES ST).

EST CONST PROGRESS.... FY-2004..92% OF BIDFY-2005..08% OF BID

RPN 015 C200492 2 BIDDER(S) DBE GOAL 5.00 %ESTIMATE 1,950,410.66

DATE AVAILABLE NOV 03 2003 THRU FEB 15 2004FINAL COMPLETION 285 DAY(S) AFTER START DATE

$ TOTALS % DIFF2,156,192.35 +10.6* W. C. ENGLISH, INC. LYNCHBURG, VA

* CHANGE IMPROPERLY MADE* USED CORRECTION FLUID

2,523,842.33 +29.4DANE CONSTRUCTION, INC. MOORESVILLE, NC

* DENOTES IRREGULAR BID

Page 17: ITEM C DIVISION OF HIGHWAYS RALEIGH N.C ......2003/09/16  · NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS RALEIGH N.C. SEPTEMBER 16, 2003 ITEM C HIGHWAY LETTING

NORTH CAROLINA DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS

RALEIGH N.C.SEPTEMBER 16, 2003

ITEM CHIGHWAY LETTING PAGE : 17 of 24

DIVISION 00009

34931.3.2STATE FUNDEDDAVIDSONU-3336

PROPOSAL LENGTH 0.582 MILES

TYPE OF WORK GRADING, DRAINAGE, PAVING & SIGNALS.

LOCATION SR-2185 (JULIAN AVE) FROM EAST HOLLY HILL RD TO MULTI-LANE SECTION ATWARNER ST IN THOMASVILLE.

EST CONST PROGRESS.... FY-2004..77% OF BIDFY-2005..23% OF BID

RPN 016 C200771 5 BIDDER(S) MBE GOAL 5.00 % WBE GOAL 3.00%ESTIMATE 1,336,914.23

DATE AVAILABLE FEB 15 2004FINAL COMPLETION OCT 01 2004

$ TOTALS % DIFF1,411,078.47 +5.5LYNN THOMAS GRADING, INC. POLKTON, NC1,524,893.80 +14.1LARCO CONSTRUCTION, A DIV. OF NELLO L. TEER CO. WINSTON-SALEM, N1,550,317.58 +16.0THOMPSON ARTHUR DIVISION OF APAC-ATLANTIC, INC. GREENSBORO, N1,811,595.09 +35.5* YATES CONSTRUCTION CO., INC. STOKESDALE, NC

* BOND EXECUTED IMPROPERLY* COUNTY NAME INCORRECT

1,878,731.13 +40.5TRIANGLE GRADING & PAVING, INC. BURLINGTON, NC

* DENOTES IRREGULAR BID

Page 18: ITEM C DIVISION OF HIGHWAYS RALEIGH N.C ......2003/09/16  · NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS RALEIGH N.C. SEPTEMBER 16, 2003 ITEM C HIGHWAY LETTING

NORTH CAROLINA DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS

RALEIGH N.C.SEPTEMBER 16, 2003

ITEM CHIGHWAY LETTING PAGE : 18 of 24

DIVISION 00009

36364.2.1IMS-85-3(180)88RANDOLPH, DAVIDSONI-4740

PROPOSAL LENGTH 16.560 MILES

TYPE OF WORK MILLING, RESURFACING & SHOULDER DRAINAGE.

LOCATION I-85 FROM I-85 / I-85 BUS SPLIT TO NC-64 & FROM NC-109 IN DAVIDSON COUNTY TOUS-311 IN RANDOLPH COUNTY.

EST CONST PROGRESS.... FY-2004..84% OF BIDFY-2005..16% OF BID

RPN 017 C200870 2 BIDDER(S) DBE GOAL 10.00 %ESTIMATE 7,581,802.19

DATE AVAILABLE NOV 03 2003FINAL COMPLETION SEP 30 2004

$ TOTALS % DIFF9,854,447.40 +30.0THOMPSON ARTHUR DIVISION OF APAC-ATLANTIC, INC. GREENSBORO, N

10,231,739.41 +35.0BLYTHE CONSTRUCTION, INC. CHARLOTTE, NC

Page 19: ITEM C DIVISION OF HIGHWAYS RALEIGH N.C ......2003/09/16  · NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS RALEIGH N.C. SEPTEMBER 16, 2003 ITEM C HIGHWAY LETTING

NORTH CAROLINA DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS

RALEIGH N.C.SEPTEMBER 16, 2003

ITEM CHIGHWAY LETTING PAGE : 19 of 24

DIVISION 00009

36365.2.1IMS-40-3(99)180DAVIE, FORSYTHI-4741

PROPOSAL LENGTH 2.590 MILES

TYPE OF WORK MILLING, RESURFACING & SLAB REPLACEMENT.

LOCATION I-40 FROM WEST OF NC-801 IN DAVIE COUNTY TO WEST OF SR-1101 (HARPER RD)IN FORSYTH COUNTY.

EST CONST PROGRESS.... FY-2004..68% OF BIDFY-2005..32% OF BID

RPN 018 C200871 2 BIDDER(S) DBE GOAL 10.00 %ESTIMATE 1,521,761.16

DATE AVAILABLE MAR 15 2004FINAL COMPLETION SEP 30 2004

$ TOTALS % DIFF1,546,201.17 +1.6THOMPSON ARTHUR DIVISION OF APAC-ATLANTIC, INC. GREENSBORO, N1,613,341.40 +6.0LARCO CONSTRUCTION, A DIV. OF NELLO L. TEER CO. WINSTON-SALEM, N

Page 20: ITEM C DIVISION OF HIGHWAYS RALEIGH N.C ......2003/09/16  · NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS RALEIGH N.C. SEPTEMBER 16, 2003 ITEM C HIGHWAY LETTING

NORTH CAROLINA DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS

RALEIGH N.C.SEPTEMBER 16, 2003

ITEM CHIGHWAY LETTING PAGE : 20 of 24

DIVISION 00011

36677STATE FUNDEDALLEGHANY

PROPOSAL LENGTH 7.000 MILES

TYPE OF WORK MILLING, RESURFACING, SHLD RECONST, GDRL & PVT MARKINGS.

LOCATION NC-18 FROM SR-1151 TO NC-88.

EST CONST PROGRESS.... FY-2004..86% OF BIDFY-2005..14% OF BID

RPN 019 C200898 1 BIDDER(S) MBE GOAL 5.00 % WBE GOAL 3.00%ESTIMATE 1,636,373.70

DATE AVAILABLE APR 05 2004FINAL COMPLETION AUG 01 2004

$ TOTALS % DIFF1,669,171.00 +2.0JAMES R. VANNOY & SONS CONST. JEFFERSON, NC

Page 21: ITEM C DIVISION OF HIGHWAYS RALEIGH N.C ......2003/09/16  · NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS RALEIGH N.C. SEPTEMBER 16, 2003 ITEM C HIGHWAY LETTING

NORTH CAROLINA DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS

RALEIGH N.C.SEPTEMBER 16, 2003

ITEM CHIGHWAY LETTING PAGE : 21 of 24

DIVISION 00011

32868.3.3BRSTP-16(26)ASHEB-3106

PROPOSAL LENGTH 0.516 MILES

TYPE OF WORK GRADING, DRAINAGE, PAVING & STRUCTURE.

LOCATION BRIDGE OVER SR-1539 & NORTH FORK NEW RIVER & APPROACHES ON NC-16.

EST CONST PROGRESS.... FY-2004..45% OF BIDFY-2005..46% OF BIDFY-2006..09% OF BID

RPN 020 C200762 6 BIDDER(S) DBE GOAL 7.00 %ESTIMATE 5,689,181.47

DATE AVAILABLE NOV 03 2003 THRU JUN 01 2004FINAL COMPLETION SEE BELOW

$ TOTALS % DIFF5,515,264.94 -3.1DLB, INC. D/B/A DLB, INC., (OF VA.) HILLSVILLE, VA5,892,192.20 +3.6CROWDER CONSTRUCTION COMPANY CHARLOTTE, NC6,098,614.47 +7.2MILLER STRUCTURES, INC. MARION, NC6,117,256.83 +7.5* W. C. ENGLISH, INC. LYNCHBURG, VA

* CHANGE IMPROPERLY MADE* USED CORRECTION FLUID

6,220,980.93 +9.3DANE CONSTRUCTION, INC. MOORESVILLE, NC6,868,193.11 +20.7JAMES R. VANNOY & SONS CONST. JEFFERSON, NC

* DENOTES IRREGULAR BID

SUMMARY OF BIDS FOR CONTRACT C200762 WITH THE CONTRACT TIME BEING BID BY EACH BIDDER

DAILY COST = $1,500.00 / DAY

MAXIMUM NUMBER OF DAYS ALLOWED = 727CONTRACT TIME

(CALENDAR DAYS)CONTRACT

AWARD BASISACTUAL CONTRACT

AMOUNT

ESTIMATED 727 5,689,181.47 4,598,681.47DLB, INC. D/B/A DLB, INC., (OF VA.) 605 5,515,264.94 4,607,764.94CROWDER CONSTRUCTIONCOMPANY

440 5,892,192.20 5,232,192.20

MILLER STRUCTURES, INC. 600 6,098,614.47 5,198,614.47W. C. ENGLISH, INC. 677 6,117,256.83 5,101,756.83DANE CONSTRUCTION, INC. 700 6,220,980.93 5,170,980.93

Page 22: ITEM C DIVISION OF HIGHWAYS RALEIGH N.C ......2003/09/16  · NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS RALEIGH N.C. SEPTEMBER 16, 2003 ITEM C HIGHWAY LETTING

NORTH CAROLINA DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS

RALEIGH N.C.SEPTEMBER 16, 2003

ITEM CHIGHWAY LETTING PAGE : 22 of 24

SUMMARY OF BIDS FOR CONTRACT C200762 WITH THE CONTRACT TIME BEING BID BY EACH BIDDER

DAILY COST = $1,500.00 / DAY

MAXIMUM NUMBER OF DAYS ALLOWED = 727CONTRACT TIME

(CALENDAR DAYS)CONTRACT

AWARD BASISACTUAL CONTRACT

AMOUNT

ESTIMATED 727 5,689,181.47 4,598,681.47JAMES R. VANNOY & SONS CONST. 727 6,868,193.11 5,777,693.11*ACTUAL CONTRACT AMOUNT = CONTRACT AWARD BASIS - (CONTRACT TIME) (DAILY COSTS)

Page 23: ITEM C DIVISION OF HIGHWAYS RALEIGH N.C ......2003/09/16  · NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS RALEIGH N.C. SEPTEMBER 16, 2003 ITEM C HIGHWAY LETTING

NORTH CAROLINA DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS

RALEIGH N.C.SEPTEMBER 16, 2003

ITEM CHIGHWAY LETTING PAGE : 23 of 24

DIVISION 00013

35006.3.1NHS-19(15)BUNCOMBE, MADISONU-4005

PROPOSAL LENGTH 17.199 MILES

TYPE OF WORK MEDIAN GUARDRAIL & GUIDERAIL.

LOCATION US-19/23 FROM I-240 TO SR-1768 (EXIT 132).

EST CONST PROGRESS.... FY-2003..100% OF BID

RPN 021 C200772 2 BIDDER(S) DBE GOAL 5.00 %ESTIMATE 1,480,187.00

DATE AVAILABLE NOV 03 2003FINAL COMPLETION JUL 01 2004

$ TOTALS % DIFF1,270,263.50 -14.2* BAGWELL FENCE COMPANY, INC. SPARTANBURG, SC

* BID EXECUTED IMPROPERLY* COMPANY NAME OMITTED

1,354,402.50 -8.5ELDERLEE, INC. OAKS CORNERS, NY

* DENOTES IRREGULAR BID

Page 24: ITEM C DIVISION OF HIGHWAYS RALEIGH N.C ......2003/09/16  · NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS RALEIGH N.C. SEPTEMBER 16, 2003 ITEM C HIGHWAY LETTING

NORTH CAROLINA DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS

RALEIGH N.C.SEPTEMBER 16, 2003

ITEM CHIGHWAY LETTING PAGE : 24 of 24

DIVISION 00014

33001.3.2BRSTP-19(14)HAYWOODB-3340

PROPOSAL LENGTH 0.464 MILES

TYPE OF WORK GRADING, DRAINAGE, PAVING & STRUCTURE.

LOCATION BRIDGE OVER RICHLAND CREEK & APPROACHES ON US-19.

EST CONST PROGRESS.... FY-2004..19% OF BIDFY-2005..52% OF BIDFY-2006..29% OF BID

RPN 022 C200763 2 BIDDER(S) DBE GOAL 9.00 %ESTIMATE 2,955,982.67

DATE AVAILABLE MAR 15 2004FINAL COMPLETION JUN 30 2006

$ TOTALS % DIFF2,994,640.53 +1.3TAYLOR & MURPHY CONSTRUCTION CO., INC. ASHEVILLE, NC3,421,871.74 +15.8MILLER STRUCTURES, INC. MARION, NC

ESTIMATE TOTAL 52,726,688.68

LETTING TOTAL 55,929,231.11 +6.1