Rammallah Documentary Center -BOQ- Item Description Unit Qty. Unit Rate Total 1 Preparation Works. 1.1 Preparing of the exiting roof. The unit rate shall include costs of demolishing parts of the existing parapets and around columns steel reinforcement starters, and all the necessary preparatory works for proper connections of the new and old structures,all in accordance with the Engineer instructions. The unit rate shall also include cost of removing the existing services and utilities and making temporary connections for all dismantled electrical and mechanical services to ensure continuous functioning of the exiting building at the lower floors. The price includes removing debris away from the site. JOB 1.0 1.2 Dismantle and remove the existing waterproofing and sloping screed on the existing roof( where needed and as directed by the Engineer) to allow for the new tiling works. M2 50.0 TOTAL CARRIED TO SUMMARY. 1/22

Upload: vohanh

Post on 04-Jun-2018

238 views

Category:

Documents


0 download

TRANSCRIPT

Rammallah Documentary Center

-BOQ-

Item Description Unit Qty. Unit Rate Total

1 Preparation Works.

1.1 Preparing of the exiting roof. The unit rate shall include

costs of demolishing parts of the existing parapets and

around columns steel reinforcement starters, and all the

necessary preparatory works for proper connections of the

new and old structures,all in accordance with the Engineer

instructions. The unit rate shall also include cost of

removing the existing services and utilities and making

temporary connections for all dismantled electrical and

mechanical services to ensure continuous functioning of

the exiting building at the lower floors. The price includes

removing debris away from the site.

JOB 1.0

1.2 Dismantle and remove the existing waterproofing and

sloping screed on the existing roof( where needed and as

directed by the Engineer) to allow for the new tiling

works.

M2 50.0

TOTAL CARRIED TO SUMMARY.

1/22

Rammallah Documentary Center

-BOQ-

Item Description Unit Qty. Unit Rate Total

2 CONCRETE WORKS.

Preamble.

Rates of Concrete Works shall include:-

1 All form works and shuttering in any form, shape and

size. Making chamfered and curved edges, allowing for

and making grooves and sleeves and the like; removal of

forms and cleaning of all exposed tie wires and rods;

making good the harmed surfaces and edges and all

surface finishing.

2. Supplying, Casting, vibrating and curing as per

specifications.

3.Approved additives and admixtures.

4. Incurred costs on Concrete Mix Designs, Sample taking,

testing and providing test results certificates, storing and

saving of samples, and preparation of bar bending

schedules and workshops.

5. Supplying of steel reinforcement of any grade, size and

length as detailed in the drawings, storing on site including

cutting, bending and fixing in position and providing all

tying wires, spacers, shop drawings, testing and bar

bending schedules

Measurement shall be only for the seen surfaces of

elements, overlapping and measuring items twice under

separate headings shall not be allowed.

Slabs are measured in meter square from Center line of

external masonry walls.

2.1 Supply and Cast Reinforced Concrete Grade 'B 250' with a

minimum cement content of 300 Kg. per cubic meter for:

a) Reinforced Walls. M3 6.0

2.2 Ditto but B 300 with a minimum cement content of 350

Kg. per cubic meter for Columns, where required.

M3 11.0

2.3 Supply and Cast Reinforced Concrete Grade 'B 250' with a

minimum cement content of 300 Kg. per cubic meter for

suspended slabs. Price to include for projected beams,

other beams projections, and drop beam, canopies supply,

lay and arrange hollow concrete blocks 'Grade 35' for

ribbed slabs, using closed end blocks as required by the

engineer at all ends, edges, openings, services location etc.

The unit rate shall include cost of making the necessary

conections with the slab of the existing stair case for

proper and sound support of the new roof slab; all in

accordance with the engineer's instructions.

a). 31 cm. thick ribbed slabs. M2 145.0

TOTAL CARRIED TO SUMMARY

2/22

Rammallah Documentary Center

-BOQ-

Item Description Unit Qty. Unit Rate Total

3 STONE WORKS.

PREAMBLE.

All Stone works shall be of local white stone of First Choice.

Stone material, size, and texturing shall be in accordance

with detailed drawings and Engineer’s instructions and

approval.

Stones shall be of not less than (5 cm. thick, 25 cm. high

and of length ranging from 1.5 to 3 times the height.)

Stones shall be homogeneous in color and texturing and

free of any defects.

Cutting, shaping and building of stone shall be in straight

angles, no twisting, distortion or uneven sizes shall be

allowed.

All cuttings shall be made using Manual.

Measurement of all types shall be in Meter Square, for the

net dimensions of the vertical plan of the elevations

excluding openings of any area.

No measurement will be made for any recesses,

projections or sides of stone pieces.

Measurement of door and window jambs and reveals,

corner pieces, and the like is not applicable.

No allowances shall be made for stone pieces in any

shape( except for the stone coping)

No allowances or extra rates shall be considered for stone

courses in lintels, overhanging slabs and roof slab courses.

The unit rate shall also include cost of stone pointing.

Taking all the above mentioned into account,

measurement for stone cladding works will follow the

shape of the laded element.

3.1 Supply and build stone walls of 30 cm. thick , to the full

length and height shown in the drawings. Similar to the

existing, the unit rate shall include the following costs:

a) Stone walls with plain concrete cement block backing.

Concrete backing of plain concrete grade B-200 and

cement block Grade 35 (10*20*40 cm) with 2 cm

polystyrene.

M2 85.0

b) Stone walls with plain concrete backing B-200 (30 cm

thick) for the parapet.

M2 25.0

3.2 Ditto but Stone cladding over reinforced concrete

elements. Price to include Concrete filling of plain

concrete Grade B-200, steel mesh and all ancillaries..

M2 20.0

3/22

Rammallah Documentary Center

-BOQ-

Item Description Unit Qty. Unit Rate Total

3.3 Re-Install the dismantled stone coping, from the existing

roof parapet, on the new roof parapet; all as directed by

the engineer.

MR 17.0

3.4 Ditto, but supply and install stone coping similar to the

existing coping).

MR 15.0

TOTAL CARRIED TO SUMMARY

4/22

Rammallah Documentary Center

-BOQ-

Item Description Unit Qty. Unit Rate Total

4 Block Works

The contractor shall, when pricing the rates of this bill,

take into consideration including and allow for the costs or

expenses of all requirements stipulated in the preambles,

drawings and technical specification of the contract.

Pre cast Concrete hollow bearing blocks built in cement

sand mortar (1:3) mix as specified.

Supply and install hollow concrete blocks built with

cement sand mortar (1:3) mix as specified. The unit price

shall include cost of 20cm minimum high concrete lintel

beams (ring beam) above concrete block walls, at

doors/windows level, and at all block walls parameter.

Unit rate shall include cost of steel reinforcement of

4Ф12mm steel bars with Ф 6mm stirrups@20cm c/c.

The price includes painting the first coarse of the block up

to the tile level with Latix Bituminous Emulsion Material

from an approved company.

4.1 7 cm thick for the internal partitions. M2 100.0

4.2 Ditto, but 15 cm thick( where needed as directed by the

engineer)

M2 20.0

Total Carried to main Summary

5/22

Rammallah Documentary Center

-BOQ-

Item Description Unit Qty. Unit Rate Total

5 PLASTERING.

PREAMBLE.

PLASTERING to all areas shall be measured net, including

openings which are less than 0.25 Meter Sq.

The price shall include for running rules , all narrow

widths, for taking out joints on block walls or backing

concrete face for key, for making good to frames around

pipes and other fittings , plastering to jambs and reveals

of openings, side of columns, window sills; all of which

shall be measured as plastering .

Price shall also include Expanded metal lath, angle beads

at all corners and plaster stops at opening edges,

expansion joints, sills, labor, curing, erecting and

dismantling of scaffoldings, additives, pigments and all

incidentals required as specified and / or detailed on the

Drawings .

Two coats of cement and sand plaster over one slurry

coat to walls and ceilings and where required including

metal Lath ,angle beads , plaster stops and all required as

per Specs and drawings .

a. Three coats internal plaster. M2 500.0

b. External plaster for parapet. M2 25.0

TOTAL CARRIED TO SUMMARY

c. Ditto but with four coats and the fourth coat

"shabriss" for external walls , material to include quartz ..

and pigments of approved color and water proofing

additive (sika or equivalent)

M2 30.0

5.1

6/22

Rammallah Documentary Center

-BOQ-

Item Description Unit Qty. Unit Rate Total

6 TILING, FLOORING AND MARBLE WORKS

PREAMBLE.

1.All tilling works ( terrazzo, ceramics and marble ) shall be

measured net in square meters. deducting all opening and

voids more than 0.25 m.s.

2.Skirting shall be measured in leaner meter.

3. Marble works for steps and treads of stairs shall be

measured in linear meter. The tread and the riser shall be

measured as a single unit.

4.Marble works for window sills and other openings shall

be measured in squared meter .

5. Marble works for urinals shall be measured in number.

6. Marble works for stair flight’s skirting shall be measured

in linear meter.

7. Rate shall include preparation of surfaces under tiles,

Finnish to falls and cross falls, special tile peace’s for edges

and the like, tile surface finishing, Plastic spacers. Pointing

and cleaning and all incidental as per specifications.

8. Rates shall include also providing and mounting in place

“School Title Marble Plate” of white clear local marble

policed, finished and engraved.

6.1 Supply, Install and finish Pre-cast Terrazzo Tiles, with

Italian marble chipping # 6.

Price to include, bedding and jointing in cement and sand

mortar, pointing with white cement, required sand fill, and

on site grinding, polishing and cleaning.

a. Size ( 30 x 30 x 2.7 ) cm. M2 125.0

6.2 Ditto but for Terrazzo skirting.

a. Size ( 30 x 7.5 x 1.5 ) cm. MR 125.0

6.3 Supply and Install Porcelain Glazed Wall Tiles, as per

UNDEFA, ROCA make-Spain or equal approved.

Price to include round edges tiles perimeters , cutting ,

patching around the services bedding in cement mortar,

grouting, pointing with white cement and two coats of

plaster . All works shall be in accordance with drawings

and specifications.

Engineer shall approve size and color of tiles which should

be not less than 20 * 20 * 0.4cm

M2 20.0

6.4 Supply and Install Non-Slip Ceramic Floor Tiles.

as per UNDEFA, ROCA make-Spain or equal approved.

Price to include concrete bedding, sand with cement filing

( Grade B-100), pointing with white cement and cleaning

on site .

Size and color shall be approved by Engineer which should

be not less than 20 *20 *0.6 cm .

M2 20.0

7/22

Rammallah Documentary Center

-BOQ-

Item Description Unit Qty. Unit Rate Total

6.5 Supply and Install Local Marble Sills, Thresholds and

Parapet Copping ( 3 cm. thick ).

Set in cement mortar bedding price to include grouting,

polishing of face and seen edges .

a. Window sills Size( 15 - 37.5 x 3 ) cm. to S. Opening. M2 6.0

TOTAL CARRIED TO SUMMARY

8/22

Rammallah Documentary Center

-BOQ-

Item Description Unit Qty. Unit Rate Total

7 CARPENTRY AND JOINERY WORKS

PREAMBLE.

Sizes of carpentry works given in the Bills of Quantities are

finished sizes and shall be as per Drawings.

Sizes of doors and other items mentioned in the Bills of

Quantities shall allow for tolerance to suit the structural

openings shown in the Drawings.

· Wooden doors and pair of doors shall be measured in

number for each structural opening, unless stated

otherwise in the Bills of Quantities.

· Wall protection wooden rubbing rails shall be measured

in linear meter.

Rates for carpentry and joinery work shall include :

a) Shop and coordinated drawings.

b) Frames, architrave, chalk holders and other holders and

20 cm. high “U” shape kick plates.

c) Allowance for plastering and tiling and the like.

d) Cutting and fitting around obstructions, Bedding and

painting.

e) Grounds, blocking and backings.

f) Plugging concrete, block work, and stone work , and

making good.

g) Ironmongery including cylindrical locks, handles,

stoppers, screws, temporary fixing, re-fixing, oiling and

adjusting.

h)The unit rate shall include cost of painting with oil paint,

and all the necessary preparatory works including priming,

putty, for the door panels and frames.

7.1 Supply and Fix Flush Panel Solid Core Doors 4.5 cm Thick

single or double sashes . with ( Frame ). (4.5*10) cm. Edge

strip banding of Hardwood ( Swedish ) , with 5 mm. thick

plywood veneer on both sides, door paneling to be of soft

wood 3.5*3.5 cm. each 2.5 cm. , frames of hardwood (

Swedish) width according to the wall thickness’ and

Allowance of 4 - 6 cm. thickness for plastering and tiling

purposes, emerged in wood preservative before erection

then embedded completely in sand - cement mortar and

completely anchored as per specification .

Architrave of Hardwood ( Swedish ) ( 7*2 )cm price to

include ironmongery, kick plates of stainless steel 20 cm

height U shape both sides, and at the bottom door

stoppers, glass 4 mm thick for vision panel, gaskets

cylindrical Lock (Wally or equal) and painting in three

coats of oil paint in addition to primer coat.

All as per Detailed Drawings.

a. Structural opening size( 100 * 210 ) cm. Type D2. NO 3.0

b. Structural opening size ( 80 * 210 ) cm. Type D 6. NO 3.0

9/22

Rammallah Documentary Center

-BOQ-

Item Description Unit Qty. Unit Rate Total

7.2 Supply & Install Bottom Wooden Kitchen Cabinet.

Cabinet's Top shall be of Local Marble, 30 mm. thick with

polished surface and seen edges. Cabinet Sides,

Elevations, Partitions, Shelves and Drawers front-side shall

be of 18 mm. thick Blockwood (latte), covered with 0.9

mm. Thick Laminated Plastic Veneer on both faces.

Blackboard seen edges shall be framed with Hardwood (

zan ) bands size (18*10) mm.

Edges of Drawer's sides shall be covered with

( 12*10 ) mm. Hardwood ( zan ) frame. Rear sides of

cabinets and drawer's bottom shall be of 5 mm, thick

Veneer covered with L.P.V. Price to include cabinet

Ceramic flooring ( 20 * 20 * 0.6) cm., and Ceramic skirting

( 20 * 10 * 0.6 ) cm., ironmongery, handles , two coats of

lacquer paint over one primer coat and all the accessories

as per drawings and Specifications.

a .Height (90) cm. Width ( 60 ) cm. MR 3.0

TOTAL CARRIED TO SUMMARY

10/22

Rammallah Documentary Center

-BOQ-

Item Description Unit Qty. Unit Rate Total

8 STEEL AND ALUMINUM WORKS

Preamble.

Rates for metalwork shall include for :

Preparing shop drawings,

Drilling, counter sinking, screwing, bolting and riveting.

Sub frames, including galvanized steel frames for

Aluminum windows and architrave.

Lugs, plugs, holdfasts and the like.

Gaskets, sashes, double weather strips and external and

internal silicon filling around frames.

Ironmonger including cylindrical locks (Union or equal) ,

stoppers, handles, temporarily fixing, refitting, oiling and

adjusting.

Providing two keys for each lock and padlock including

tagging.

Hardware including cramps, dowels and the like.

Glass and glazing including cutting to size, putty and

rubber.

Preparing surfaces for and painting one coat of primer

before fixing.

Sealing and Painting to any area or width in any location

including work in multicolor and cutting in edges.

All other accessories and incidentals required to execute

the work.

8.1 Supply, fix and operate sliding Aluminum Windows.

Similar to the existing in type and colour, two and half runs

for horizontal and vertical partitions, with protective

Electro statically applied polyester powder paint of 70-80

microns. In color approved by the Engineer. Price to

include 6 mm float clear glazing, fly screens, and all other

accessories and fittings to complete works as per drawing

and specifications. Price shall also include cost of

Aluminum roll shutter and the necessary aluminum boxes.

8.1.1 W1: 160x156 cm No 7.0

8.1.2 W2: 250x182 cm No 2.0

8.1.3 W3: 40x104 cm No 3.0

8.2 Supply and Install Window Protection Steel Grilles.

As existing including fixation, accessories, welding,

grinding & smoothening.

Price also to include Black oil painting three coats in

addition to two primer coats.

M2 32.0

8.3 Supply and install multi-lock steel door similar to "Raf

Bareih" for the entrance door.

No 1.0

8.4 Wooden and glass wall partition. The price shall include

6mm glass, the Ironmongery and carpentry works as per

the detailed drawings.

M2 8.0

TOTAL CARRIED TO SUMMARY

11/22

Rammallah Documentary Center

-BOQ-

Item Description Unit Qty. Unit Rate Total

9 PAINTING WORKS

Preamble.

Painting and decorating to walls, ceilings and the like shall

be measured net in meter square.

Painting to other works shall be included in the related

items.

Paints shall be supplied to site in sealed container, as

approved by the Engineer, and site mixing shall not be

permitted.

The Contractor rates shall include for supply of all

materials, workmanship, samples, primers , surface

preparation , protection of painted surfaces ,

application to all heights as required of works, repair of

all damaged surface at the contractor's expenses , and all

other requirements as stated in the Specifications . All

paints should be from DELUX or Equivalent.

9.1 Supply and paint Emulsion PVA-Based Paint, for interior

walls, of high quality, on one priming coat , two coats of

putty and two finishing coats , for application to walls.

M2 300.0

9.2 Supply and paint Policed paint for ceilings. M2 135.0

9.3 Supply and paint with oil based Paint, for interior walls, of

high quality, on one priming coat , two coats of putty and

two finishing coats , for application to walls.

M2 50.0

TOTAL CARRIED TO SUMMARY

12/22

Rammallah Documentary Center

-BOQ-

Item Description Unit Qty. Unit Rate Total

10 INSULATION , ROOFING

Preamble.

All finishes shall be measured superficially net unless other

wise stated clearly.

Triangular shaped fillets and cement and sand lining to

gutters shall be measured in linear meter , unless other

wise stated clearly.

Rates for cement and sand work shall include for :

Hacking concrete, applying cement slurry or raking out

joints of blockwork to form key. Application to any surface.

Finish to surface, to falls, cross falls and currents.

Forming bays including joints. Finish to edges and arises.

Making good around steel sections, pipes, tubes, bars,

brackets, outlets, and the like.

Measurement for water proofing shall be for sectional roof

area only.

Rates for waterproofing and roof sheeting shall include for

:

Preparation of surface,Cuting in edges. Overlaps, priming

and treatment at the corners and floor drains.Dressing

over parapets and stub columns including forming groove

to receive edge of elasticized bitumen membrane and

sealing with elastic sealer.

Side and end laps, Fittings including bolts, hook bolts,

screws and washers,Sheets of any width or length .

10.1 Plain Cast in Place light weight concrete ,cast to falls not

less than 40 mm. thickness in the lower point as shown on

detailed drawings with smooth surface finish,. All to

comply with specifications and Engineers directions. The

cost shall include cost of applying 2cm cement screed layer

on the top of the light weight concrete.

Hunching and lining to the edges of roof screed and

parapet, With slope 1: 1 to minimum height of 20 cm.

M2 130.0

10.2 Supply and apply waterproofing membrane of bitumen

rolls. (4 mm. thick. Density 180g per m.s. of reinforced

polyester sheets) covered with layer of crushed white

stone. with overlaps of not less than 10 cm. price to

include primer coat, and all sheets flashing. For roof of

main building and roofs of stair cases.

M2 145.0

10.3 Supply and apply two coats of waterproofing under

ceramic floor tiles of toilets.

M2 10.0

TOTAL CARRIED TO SUMMARY.

13/22

Rammallah Documentary Center

-BOQ-

Item Description Unit Qty. Unit Rate Total

11 Mechanical Works

11.1 SANITARY FIXTURES

11.1.1 WATER CLOSET.

Including connection to domestic cold water supply and

drainage network to rizre and all required fittings and

accessories needed to complete the work as shown on

drawings and as per specifications.

A Floor standing W.C. - Ideal standard ECCO Type or

equivalent including flushing tank and heavy duty cover.

NO. 2.0

B Toilet paper holder Stainless steel for one roll NO. 2.0

C Thumb flushing head complete with spray outlet, flexible

pipe 1.20 m long , chrome plated angle valve 3/8", hanger.

- Ideal standard N9266AA or equivalent.

NO. 2.0

11.1.3 WASH BASIN - WALL MOUNTED.

Including connection to domestic hot & cold water supply

and drainage network to the nearest drain and all required

fittings and accessories needed to complete the work as

shown on drawings and as per specifications.

A Wash Basin - Ideal standard ECCO or equivalent. NO. 2.0

B Chrome plated basin faucet mixer - Zeckote or equivalent. NO. 2.0

C Siphon - chrome plated NO. 2.0

D Concealed Chrome plated support NO. 2.0

11.1.4 SINK - BUILT IN COUNTER.

Including connection to domestic hot & cold water supply

and drainage network and all required fittings and

accessories needed to complete the work as shown on

drawings and as per specifications.

A Sink built in counter - Ideal standard R3862 or equivalent. NO. 1.0

B Chrome plated sink faucet mixer - Zeckoteor equivalent. NO. 1.0

C Siphon - chrome plated - Sanit or equivalent. NO. 1.0

11.2.1 UPVC PIPES & FITTINGS.

UPVC pipes for internal drainage network - UAP or

equivalent. Including all required fittings and accessories

needed to complete the work as shown on drawings and

as per specifications.

A UPVC 2" dia MR. 25.0

B UPVC 3" dia MR. 6.0

C UPVC 4" dia MR. 50.0

D UPVC Siphon 4" NO. 4.0

E UPVC Siphon 2" NO. 2.0

F Branch "Y" - 4" NO. 6.0

G Elbow 45 deg - 4" NO. 4.0

H Elbow 45 deg - 2" NO. 3.0

14/22

Rammallah Documentary Center

-BOQ-

Item Description Unit Qty. Unit Rate Total

I Elbow 90 deg - 2" NO. 6.0

J Ball Branch 4"/2" NO. 5.0

K Wall - WC Bend NO. 2.0

L Wall - WC Double Bend NO. 1.0

11.2.2 FLOOR DRAIN.

4" dia. UPVC heavy duty adjustable floor drain Type Artc

or equivalent . Including connection to pipe and all

required fittings and accessories needed to complete the

work as shown on drawings and as per specifications.

NO. 5.0

11.2.3 CLEANOUT.

4" dia UPVC cleanout. Including connection piece to

drainage pipe and all required fittings and accessories

needed to complete the work as shown on drawings and

as per specifications

NO. 4.0

11.3 STORM WATER SYSTEM

11.3.1 U.P.V.C PIPES (BS 4660).

UPVC (BS 4660) pipes for external storm network.

Including fittings and all accessories needed to complete

the work as shown on drawings and as per specifications.

A UPVC 4" MR. 27.0

B UPVC 3" MR. 10.0

11.3.2 ROOF DRAIN.

Supply and install 4" roof drain pipe with plastic mesh

including Y 4" elbow 45 deg and 90 deg elbow

NO. 3.0

Ditto but 3" NO. 1.0

11.4 DOMESTIC WATER SYSTEM

11.4.1 GALVANIZED PIPES & FITTINGS

AKO or equivalent seamless schedule 40 galvanized .

Including valves and all required fittings and accessories

needed to complete the work as shown on drawings and

as per specifications.

A Pipe - dia. 11/2" MR 4.0

B Pipe - dia. 11/4" MR 4.0

C Pipe - dia. 1" MR 25.0

D Pipe - dia. 3/4" MR 35.0

E Pipe - dia. 1/2" MR 10.0

11.4.2 PE-X PIPES

GIACOFLEX or equivalent. Incuding fittings and all

accessories needed to complete the work as shown on

drawings and as per specifications.

A Cold water PE-X Pipes 16mm with blue guid pipe.

(R993Y006).

MR 55.0

B Hot water PE-X Pipes 16 mm with red guide pipe

(R994Y006).

MR 55.0

C Sanitary system connection - (R573D) NO. 6.0

D Adjastable horizantal brackets- (R578C) NO. 6.0

15/22

Rammallah Documentary Center

-BOQ-

Item Description Unit Qty. Unit Rate Total

11.4.3 PROTECTION - EMBEDED DOMESTIC COLD WATER PIPES

Insulation for embeded domestic cold water pipes and

fittings either in walls or under ground. Including all

accessories needed to complete the work as shown on

drawings and as per specifications.

A Pipe 1" MR 25.0

B Pipe 3/4" MR 35.0

11.4.4 INSULATION - EMBEDDED & CONCEALED DOMESTIC HOT

WATER PIPES

Insulation for supply / return domestic hot water pipes and

fittings either concealed in shafts, false ceiling void or

embedded in walls - Vidoflex or equivalent. Including all

fittings and accessories needed to complete the work as

shown on drawings and as per specifications.

A 25mm wall thick insulation for 1" pipes. MR 10.0

B 25mm wall thick insulation for 3/4" pipes. MR 20.0

11.4.6 HOT / COLD WATER COLLECTOR

GIACOMINI or equivalent. Including connection to

domestic hot / cold water network, fittings and all

accessories needed to complete the work as shown on

drawings and as per specifications.

B Manifold 3/4" with assembled lockshield -3 eyes collector NO. 1.0

E Manifold 1" with assembled lockshield - 8 eyes collector NO. 2.0

G Manifold end piece 3/4" or 1" NO. 2.0

H Automatic air vent - R88 NO. 2.0

I Plug R592D 3/4" or 1" NO. 2.0

J Ball Valves 3/4" - R851 NO. 3.0

K Cabinet - R500A NO. 1.0

L Bracket R583 NO. 4.0

M Key R73K NO. 2.0

N Set of labels NO. 4.0

11.5 SOLAR HEATING WATER SYSTEM

11.5.1 BLACK STEEL SEAMLESS PIPES & FITTINGS

AKO or equivalent seamless schedule 40 black steel.

Including valves and all required fittings and accessories

needed to complete the work as shown on drawings and

as per specifications.

A Pipe - dia. 3/4" MR 40.0

11.5.2 INSULATION - CONCEALED PIPES

Insulation for supply & return heating water pipes

concealed in shafts and false ceiling void - Vidoflex or

equivalent. Including all accessories needed to complete

the work as shown on drawings and as per specifications.

A 32mm wall thick insulation for 3/4" pipes MR 40.0

16/22

Rammallah Documentary Center

-BOQ-

Item Description Unit Qty. Unit Rate Total

11.5.3 INSULATION - PIPES ON ROOF & IN BOILER ROOM

Insulation with galvanized sheet metal 0.7 mm clading for

supply & return heating water pipes either on roof or in

boiler room. Including all accessories needed to complete

the work as shown on drawings and as per specifications.

A Clading for 3/4" pipes MR 10.0

11.5.5 SOLAR COLLECTORS

AMCOR SOLARION with absorber area 2 squire meter or

equivalent. Including valves, automatic air vents, steel

stand, solar boiler with heat exchanger 1000 lt PVC tank

and all required fittings and accessories needed to

complete the work as shown on drawings and as per

specifications.

NO. 1.0

11.6 CENTRAL HEATING SYSTEM

11.6.1 BLACK STEEL SEAMLESS PIPES & FITTINGS

AKO or equivalent seamless schedule 40 black steel.

Including valves and all required fittings and accessories

needed to complete the work as shown on drawings and

as per specifications.

A Pipe - dia. 11/2" MR. 10.0

B Pipe - dia. 11/4" MR. 40.0

C Pipe - dia. 1" MR. 12.0

11.6.2 PE-X PIPES

GIACOFLEX or equivalent. Including fittings and all

accessories needed to complete the work as shown on

drawings and as per specifications.

A Supply heating water PE-X Pipes 16mm with blue guide

pipe. (R993Y006).

MR. 160.0

B Return heating water PE-X Pipes 16 mm with red guide

pipe (R994Y006).

MR. 160.0

C Adaptor connection - (R573D) NO. 2.0

11.6.3 INSULATION - HEATING WATER PIPES ON ROOF & BOILER

ROOM

Fibrous glass insulation complete with galvanized sheet

metal 0.7 mm thick cladding for supply / return heating

water pipes located either on roof or in boiler room.

Including all accessories needed to complete the work as

shown on drawings and as per specifications.

C 50 mm wall thick insulation 11/2" pipes MR. 10.0

11.6.6 HEATING WATER COLLECTOR

GIACOMINI or equivalent. Including connection to central

heating network, all fittings and accessories needed to

complete the work as shown on drawings and as per

specifications.

A Pair of manifolds 1" with 9 eyes each NO. 2.0

E Self sealing end piece for manifold - 1" complete with

automatic air vent , manifold end piece and drain cock

NO. 2.0

17/22

Rammallah Documentary Center

-BOQ-

Item Description Unit Qty. Unit Rate Total

11.6.7. ALUMINUM HEATING RADIATORS

DECORAL or equivalent. Including all fittings and

accessories needed to complete the work as shown on

drawing and as per specifications.

A Decoral FR2 60 Sec. 105.0

B Automatic Air Vent GIACOMINI or equivalent chrome

plated R200

NO. 24.0

C Angle valve 3/4" ARKA or equivalent chrome NO. 24.0

11.7 Air Conditioning Units:

11.7.1 Supply and Install of forward curve decorative type split

unit heat pump made by York (USA), Daikin (Japan), Carrier

(France) or Equally approved of the size 1 Ton. The unit

shall be a single coil with all parts such as copper valves,

washable flat filter, multi speed electric motor and room

thermostat with three speed switch (wall mounted),

distance remote controll. The rate includes drilling and

diggings needed, concrete works, copper pipes of proper

diametres with 9 mm insulation and 10 cm width plastic

wrap strips, all the required fittings internally and

externally, flexible pipe for drain water to be connected to

the PVC A/C drain pipe in wall, electrical control cable. All

done as per specifications and the approval of the

Engineer.

NO. 2.0

Total Mechanical Works carried to main Summary

18/22

Rammallah Documentary Center

-BOQ-

Item Description Unit Qty. Unit Rate Total

12 Electrical Works

Important Notes:

All materials and accessories that will be used shall be

according to the Approved Manufacturer List attached to

the electrical specifications (see attachment # 1)

12.1 Electrical Switchboards

a. Supply, install and connect the electrical switchboards to

the site, including all associated materials and labor, as

described in the technical specifications.

b. Cabinets with no access from the rear, made up of

transparent polycarbonate cells, or sheet-metal cabinets

with a 25% surplus space.

c. The switchboards are to be placed on the floor, in a niche

against the wall.

d. Main supply lines enter from the switchboard bottom, top

or side, while outgoing lines exit the switchboard from

both its bottom and top sides.

e. Price to include all structural elements required in order to

install the switchboard, including bus-bars, terminals,

wiring, bolts, clamps, etc. and for the equipment listed

below.

f. Prices for supply, installation and connection of various

accessories including all associated labor and materials

such as bus-bars, terminals, wiring reinforcements,

mounts, engraved "sandwich" type identification plates,

etc. including connection to mains supply - complete ready

for use.

g. Shop drawings shall submitted for approval to the

supervisior engineer.

12.1.1 DB-T L.S. 1.0

12.2 Installation in the Building Points

Supply and installation all the following points, the work to

include all required material and accessories.

12.2.1 Wall or ceiling mounted lighting point or in acoustic ceiling

10A (Price includes 16mm diameter conduit, 3x1.5 sq.m

cross section leads or cable and any required switches.

Point 18.0

12.2.2 Emergency lighting and orientation signing point (Price

includes 16mm diameter conduit, 1.5 sq.m cross section

leads or cable and any required switches.

Point 3.0

12.2.3 Standard wall - mounted socket outlet point normal (Price

includes 16mm dia. Conduit, 3x2.5mm2 cross section leads

or cable with 16A socket.

Point 12.0

12.2.4 Ditto as 12.2.3 but Double. Point 9.0

12.2.5 Ditto as 12.2.3 but with Waterproof cover. Point 3.0

19/22

Rammallah Documentary Center

-BOQ-

Item Description Unit Qty. Unit Rate Total

12.2.6 UPS socket outlet point OBO Bettermann type (Price

includes 3x2.5mm2 cross section leads or cable with 16A

socket.

Point 8.0

12.2.7 Supply, install and connect socket outlet 1PH 16 A with

indication lamp for the split (Price includes 3x2.5mm2

cross section leads or cable, 16mm dia. Conduit).

Point 1.0

12.2.8 Telephone connection point (Price includes 23mm

diameter conduit with a 2 x 2 x 0.5 telephone cable,

telephone socket per PalTel standard and leading from

point to the telephone section in LV box).

Point 4.0

12.2.9 Fire Alarm connection point (Price includes 16 mm

diameter conduit with cable, leading from point to the LV

box or to the nearest point).

Point 16.0

12.2.10 TV/SAT connection point (Price includes 23 mm diameter

conduit with cable, leading from point to the LV box).

Point 1.0

12.2.11 Computer outlet connection point (Price includes 16 mm

diameter conduit, CAT 6 cable to the rack cabinet in the

server room.

Point 6.0

12.2.12 Supply install and connect main telephone cable from the

main low voltage boxe to the sub low voltage box in the

proposed floor and from the main low voltage box to the

telephone exchange. Rate to include 2 NO's. 10 pair

cables, conduits, terminal blocks and all accessories as

specified in the technical specification and drawings.

Job 1.0

12.3 Cables & Conductors Works

Supply and installation of the following cables and wire,

the work to include all required materials and accessories.

12.3.1 5x10 sq.mm cross section. M.L. 35.0

12.3.2 3x2.5 sq.mm cross section M.L. 40.0

12.4 Cable Conduit & Ducts

Supply and installation of the following conduits, the work

to include all required materials and accessories.

12.4.1 36mm diameter. M.L 35.0

12.4.3 29mm diameter. M.L 20.0

12.5 Lighting Fixtures and Accessories

Supply and installation of the following lighting fixtures,

including all necessary accessories, required in order to

light it complete.

12.5.1 30x120cm, 2x36w surface mounted fluorescent fixture

with opal diffuser.

Unit 18.0

12.5.2 Ditto but with emergency kit 3 Hours. Unit 3.0

12.5.3 2x18w compact fluorescent surface mounted Globe IP 44

with opal cover.

Unit 2.0

12.6 Low Voltage Boxes

12.6.1 LVT(700x400x400)mm L.S. 1.0

12.6.2 LV-Server Room(516x202x80)mm L.S. 1.0

20/22

Rammallah Documentary Center

-BOQ-

Item Description Unit Qty. Unit Rate Total

12.7 Fire Alarm System

12.7.1 Main addressable fire alarm control panel up to 100

address point including batteries and charger.

Unit 1.0

12.7.2 Intelligent photo electric smoke detector Unit 11.0

12.7.3 Intelligent heat detector Unit 1.0

12.7.4 Addressable break glass unit Unit 2.0

12.7.5 indoor alarm siren Unit 2.0

12.8 Network Installations

12.8.1 Supply, install, connect, test and commission Cat 6 Patch

Panel 24 ports 3M or equally approved.

No. 1.0

12.8.2 24 Ports 10/100/1000 Switch, Power over Ethernet, 3 com

or equally approved.

No. 1.0

12.8.3 6U-19" Rack cabinet No. 1.0

Total Electrical Works carried to main Summary

21/22

Rammallah Documentary Center

-BOQ-

Item Amount

Bill No. 1

Bill No. 2

Bill No. 3

Bill No. 4

Bill No. 5

Bill No. 6

Bill No. 7

Bill No. 8

Bill No. 9

Bill No. 10

Bill No. 11

Bill No. 12

Net Grand Totals in Wards……………………………………………………………………………………………………

Contractor name………………………………………………………….

Date……………………………………………………………………………….

Net Grand Total

Preparation Works

Grand Total

Percent : % Addition or Discount

Electrical Works.

Stone Works.

Concrete Block works.

Plastering.

Painting Works.

Steel and Aluminum Works.

Description

Summary

Insulation, Roofing and Expansion Joints.

Plumbing, Sanitary and Mechanical Works.

Tiling, Flooring and Marble works.

Carpentry and Joinery Works.

Concrete Works.

22/22