ITS for BRT Systems: How Does Boston’s Silver Line Compare With Other BRT Systems? Carol Schweiger, Assistant Vice President ITS Georgia Annual Meeting August 29, 2005

Upload: aminia

Post on 19-Jan-2016

26 views

Category:

Documents


0 download

DESCRIPTION

ITS for BRT Systems: How Does Boston’s Silver Line Compare With Other BRT Systems?. Carol Schweiger, Assistant Vice President ITS Georgia Annual Meeting August 29, 2005. Presentation Outline. ITS Technologies for BRT: Operational improvements Customer service improvements - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: ITS for BRT Systems: How Does Boston’s Silver Line Compare With Other BRT Systems?

ITS for BRT Systems: How Does Boston’s Silver Line Compare

With Other BRT Systems? Carol Schweiger, Assistant Vice President

ITS Georgia Annual MeetingAugust 29, 2005

Page 2: ITS for BRT Systems: How Does Boston’s Silver Line Compare With Other BRT Systems?

Presentation Outline

• ITS Technologies for BRT:Operational improvementsCustomer service improvements

• Comparison of Silver Line with Other Existing Systems

• Comparison with Planned BRT systems

• Summary

Page 3: ITS for BRT Systems: How Does Boston’s Silver Line Compare With Other BRT Systems?

Categories of ITS for BRT

• Operational Improvements:Vehicle Priority and Access Control Intelligent Vehicle Initiative (IVI) TechnologiesAutomated/Electronic Fare CollectionOperations ManagementSecurity Technologies

• Customer Service Improvements:Passenger InformationPassenger ConveniencePassenger Safety and Security Technologies

Page 4: ITS for BRT Systems: How Does Boston’s Silver Line Compare With Other BRT Systems?

ITS Effects on BRT System Performance

Travel Time

SavingsReliability

Identity and Image

Safety and Security

Capacity

Vehicle PrioritizationDriver Assist and Automation TechnologyOperations ManagementPassenger InformationSafety and Security TechnologySupport Technologies

System Performance

Page 5: ITS for BRT Systems: How Does Boston’s Silver Line Compare With Other BRT Systems?

MBTA Silver Line

Page 6: ITS for BRT Systems: How Does Boston’s Silver Line Compare With Other BRT Systems?

MBTA Silver Line Phases 1 and 2

Page 7: ITS for BRT Systems: How Does Boston’s Silver Line Compare With Other BRT Systems?

MBTA Silver Line ITS (Phase 1)

•GPS-based AVL/CAD System•Automated annunciation•Real-time information on DMS at selected stops (not fully operational yet)•Security system in tunnel portion of system•Some technology is deployed in the rest of the MBTA bus operation

Page 8: ITS for BRT Systems: How Does Boston’s Silver Line Compare With Other BRT Systems?

ITS in BRT Systems

Silv

er L

ine

Chi

cago

Nei

ghbo

rhoo

d E

xpre

ss

Hon

olul

u C

ity E

xpre

ss

Las

Veg

as M

AX

Los

Ang

eles

Met

ro R

apid

Mia

mi S

outh

Dad

e B

usw

ay

Orla

ndo

Lym

mo

Pitt

sbur

gh

Pho

enix

Rap

id

Transit Signal PriorityCollision WarningAutomated Scheduling and DispatchAVLTraveler Information at Station/StopTraveler Information on VehicleTrip Itinerary PlanningSilent AlarmVoice/Video MonitoringAdvanced Communications SystemAutomatic Passenger Counting

Page 9: ITS for BRT Systems: How Does Boston’s Silver Line Compare With Other BRT Systems?

Comparison with Other BRT Systems

Silv

er L

ine

Chi

cago

Nei

ghbo

rhoo

d E

xpre

ss

Hon

olul

u C

ity E

xpre

ss

Las

Veg

as M

AX

Los

Ang

eles

Met

ro R

apid

Mia

mi S

outh

Dad

e B

usw

ay

Orla

ndo

Lym

mo

Pitt

sbur

gh

Travel Time Reduction 26% 15-25% 7-20% 35% 17-29%

Customer Perception of Travel Time73.2% pax rate above avg or excellent

3.82/5 vs. 3.42/5

59% pax rate good or very good

85% pax rpt shorter travel times - avg reduction of 14 minutes

Customer Perception of Wait Time and Transfer Time

60.2% pax rate above avg or excellent

3.76/5 vs. 3.15/5

44% pax good or very good

78% pax perceive reduced wait time. 52% reported easier transferring

Customer Perception of Travel Time Reliability

65% pax rate above avg or excellent

92% pax rate excellent or good

68% perceive improved schedule adherence

Customer Perception of Security55.6% pax rate above avg or excellent

3.88/5 vs. 3.40/5

67.5% rate safety good or very good.

Change in Ridership in Corridor 85% 9-14% 2-47% 186% 135%

Page 10: ITS for BRT Systems: How Does Boston’s Silver Line Compare With Other BRT Systems?

LA Metro Rapid Bus Arrival Information System• LADOT developed Bus Arrival Information System,

not LACMTA (which operates Metro Rapid)

• Based on city’s computerized Automatic Traffic Surveillance and Control System (ATSCS)

• Low cost system - utilizes loop-transponder technology

• One-line LED DMSs in specially-designed bus shelters

Page 11: ITS for BRT Systems: How Does Boston’s Silver Line Compare With Other BRT Systems?

LA Metro Rapid Signal Priority• LACMTA provides LADOT with schedule for

each Metro Rapid bus each day• Throughout the day, ATSCS computer performs

schedule adherence• If bus behind schedule, computer can extend the

green at the traffic signal in its immediate path• Computer knows location and speed of bus, and

the fact that lights in its path will remain green, so it can accurately calculate time for bus to reach its next stop

Page 12: ITS for BRT Systems: How Does Boston’s Silver Line Compare With Other BRT Systems?

Lynx FlexBus Concept

• Dynamically routed and dispatched point-to-point operation

• Responds to user request, real-time and pre-booked (12-minute maximum wait time)

• Fare payment prior to boarding• Stations at activity centers • Transit ITS support• Station access only• No fixed schedules • No fixed routes

Page 13: ITS for BRT Systems: How Does Boston’s Silver Line Compare With Other BRT Systems?

FlexBus ITS Technologies

• On-vehicle systems, including mobile data terminal

• Automated reservations, scheduling, and vehicle assignment system

• CAD/AVL• Electronic fare payment system and boarding

pass• High capacity, high speed, reliable wireless

communications

Page 14: ITS for BRT Systems: How Does Boston’s Silver Line Compare With Other BRT Systems?

FlexBus: How It Works

• User requests ride and selects destination station using either phone (IVR), Internet, station kiosk or remote kiosk

• System Selects “best fit” vehicle

• Prompts user to confirm trip

• User boards vehicle and swipes Boarding Pass

• Trip confirmed

Page 15: ITS for BRT Systems: How Does Boston’s Silver Line Compare With Other BRT Systems?

FlexBus ITS:Enabling the Concept

• ITS enables the flexibility (operations improvement):Reservation processWait timeFare payment/boarding pass

• ITS provides marketing opportunities (customer information improvement):High-quality transit serviceAppeals to “choice” riders Improves perception of transit

Page 16: ITS for BRT Systems: How Does Boston’s Silver Line Compare With Other BRT Systems?

Summary: Evidence that ITS Affects Key Silver Line BRT Service Factors

• Operations:Running time and running time reliabilityDwell time and dwell time reliabilityWait time and transfer timeService reliabilitySafety and securityCapacity