itw2008: p. campus, r. oldfield bermuda, 3-7 november 2008 the recently installed ims infrasound...

53
ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban Treaty Organization (CTBTO) IMS, Engineering and Development Section, Acoustic Monitoring Project e-mail: [email protected] Roger Oldfield, Eng. Telecom Consultant e-mail: [email protected] W2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

Upload: thomas-shields

Post on 13-Jan-2016

219 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

The recently installed IMS Infrasound Station IS51, Bermuda

Paola CampusComprehensive Nuclear-Test-Ban Treaty Organization (CTBTO) IMS, Engineering and Development Section, Acoustic Monitoring Projecte-mail: [email protected]

Roger Oldfield, Eng.Telecom Consultante-mail: [email protected]

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

Page 2: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

The installation of IS51 is the result of a very efficient teamwork

involving the Bermuda Government, Local and Overseas Companies and

Consultants, who provided the Provisional Technical Secretariat of CTBTO with a crucial contribution

to the realization of the project

Page 3: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

Cabinet Conclusion number 23(07)7 dated 19 June 2007 indicating the Cabinet’s approval

for the establishment of an Infrasound Monitoring Station IS51 at five sites in

Bermuda

Page 4: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

Installation: July 2008

Page 5: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

Location of IS51 in Bermuda

Page 6: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

Installation works, July 2008

Page 7: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

Installation works, July 2008

Page 8: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

Installation works, July 2008

Page 9: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

Installation works, July 2008

Page 10: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

Installation works, July 2008

Page 11: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

Examples of infrasound signals recorded at

IS51

Page 12: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

Natural events

Page 13: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

Storm

Page 14: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

IS51:

Page 15: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

IS51:

Page 16: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

IS51:

Page 17: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

Can IS51 help track hurricanes in the future?

Page 18: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

Man-made events

Page 19: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

Flight activity

Page 20: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

IS51: Flight activity

Page 21: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

IS51: Flight activity

Page 22: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

IS51: Flight activity

Page 23: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

IS51: Flight activity

Page 24: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

IS51: Flight activity

Page 25: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

IS51: Flight activity

Page 26: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

IS51: Flight activity

Page 27: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

Quarry blasting

Page 28: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

IS51: Wilkinson Quarry ~400m from H4

Page 29: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

IS51: Wilkinson Quarry ~400m from H4

Page 30: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

IS51: Wilkinson Quarry ~400m from H4

Page 31: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

IS51: Wilkinson Quarry ~400m from H4

Page 32: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

Old Club Med Implosion

Page 33: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

Club Med Demolition St. George, Bermuda

25th August, 2008

Page 34: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

Page 35: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

Interior Demolition

• All asbestos containing materials has been removed from the building

• The internal demolition included the following:

– Removal of all Non-Load Bearing Walls

– Removal of any remaining debris

– Removal of all material, leaving only the structural members

Page 36: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

Before

After

Page 37: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

The Implosion Process

The building will not be blown up.

Explosives will be used as a tool to displace selected load-bearing members in a controlled sequence to cause a progressive collapse of the structure within the building footprint.

Total weight of Explosives was 730 lbs 2,030 sticks of Dynamite or Explosive Charges

Page 38: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

Columns

Pre-determined columns will be drilled and prepared for the placement of explosives.

Explosives will displace the selected load bearing columns.

Typical Charge Placement with plug and detonator.

Page 39: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

•Over 1,700 horizontal bore holes will be drilled at column and wall positions.

• Holes will provide acceptance for predetermined quantities of high explosives.

•Holes will be drilled roughly 2/3’s the depth of the column. Explosives will be place in the holes and then plugged with a sealing material.

Page 40: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

Walls

Secondary masonry wall units on the lower two levels and selected upper floor level will be modified. Modification is to include making columns in shear walls, elevator shafts, and stairwells.

Selected sections of the end walls will be modified in order to create planes of failure for the east and west wings of the structure.

Page 41: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

Protection

• Covering Protection will be installed on/around the structure to create a blast curtain.

• Approximately 35,000 square feet of 11 ½ - gauge fencing and 80,000 square feet of geo-textile fabric will be used for protection.

Page 42: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

Vibrations

The performance phase of the explosive demolition work will create a 7-second duration per an “Impact Event.” During this relatively concise demolition period three physical force types will actively emerge and produce their respective levels of vibration and air over-pressure values. The following are the stated forces as they relate to blast data criteria:

1. Air Transmitted Over-Pressure (Concussion)

2. Vibration per Explosive Detonation

3. Dynamic Compaction per Structural Collapse

Page 43: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

Seismic Monitoring

A geological firm will be employed to perform pre-blast survey inspections on selected adjacent properties prior to the scheduled demolition date. The survey will address the stated area and document their findings per existing conditions.

The same firm will then conduct a post-blast survey to inspect the post-blast conditions of the selected areas around the site.

Seismographs will be placed in strategic locations, which will surround this structure and monitor the seismic impact of the event which will provide us with the magnitude of both vibrations and air over-pressure.

Seismic Locations and Readings: #1 was placed 381ft North West of Blast Site - 0.35in/s at 64 Hz, >148 dB#2 was placed 390 ft North of Blast Site - 0.17in/s at 64 Hz, >148 dB#3 was placed 690 ft South East of Blast Site - <0.10in/s at 64Hz, <125 dB#4 was placed 175 ft South West of Blast Site – 0.16in/s at 23 Hz, 141.8 dB

Page 44: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

Implosion video link:F:\ITW 2008\presentations\Session 3 - The International Monitoring System\3-05 Campus Oldfield\VIDEO_TS\VTS_01_0.IFO

Page 45: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

Results of analysis of data recording the Club Med Hotel implosion on the 25th August, 2008 using the

Progressive Multi-Channel Correlation technique

Data filtered between 0.4 and 8 Hz

Page 46: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

IS51: Old Club Med implosion 2008/08/25: location of Old Club Med and of IS51

Page 47: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

IS51: Old Club Med implosion 2008/08/25

Page 48: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

IS51: Old Club Med implosion 2008/08/25

Page 49: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

IS51: Old Club Med implosion 2008/08/25 Detail of waveforms

Page 50: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

IS51: Old Club Med implosion 2008/08/25

Page 51: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

Implosion video link:F:\ITW 2008\presentations\Session 3 - The International Monitoring System\3-05 Campus Oldfield\VIDEO_TS\VTS_01_0.IFO

Page 52: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

IS51: potential for detection of a large number of events

Page 53: ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008 The recently installed IMS Infrasound Station IS51, Bermuda Paola Campus Comprehensive Nuclear-Test-Ban

ITW2008: P. Campus, R. Oldfield Bermuda, 3-7 November 2008

Thank you