ivatf/2 montreal, 11 th – 15 th july 2011 follow up to volcex 11/01 and grimsv Ö tn
DESCRIPTION
IVATF/2 Montreal, 11 th – 15 th July 2011 FOLLOW UP TO VOLCEX 11/01 AND GRIMSV Ö TN. Žarko SIVČEV EUROCONTROL Directorate Network Management. European Organisation for the Safety of Air Navigation. VOLCEX 11/01 Grimsv ö tn EVITA European Aviation Crisis Coordination Cell (EACCC). - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: IVATF/2 Montreal, 11 th – 15 th July 2011 FOLLOW UP TO VOLCEX 11/01 AND GRIMSV Ö TN](https://reader033.vdocuments.net/reader033/viewer/2022051623/56815928550346895dc650f5/html5/thumbnails/1.jpg)
IVATF/2Montreal, 11th – 15th July 2011
FOLLOW UP TO VOLCEX 11/01 AND
GRIMSVÖTN
European Organisation for the Safety of Air Navigation
Žarko SIVČEVEUROCONTROL
Directorate Network Management
![Page 2: IVATF/2 Montreal, 11 th – 15 th July 2011 FOLLOW UP TO VOLCEX 11/01 AND GRIMSV Ö TN](https://reader033.vdocuments.net/reader033/viewer/2022051623/56815928550346895dc650f5/html5/thumbnails/2.jpg)
1. VOLCEX 11/012. Grimsvötn3. EVITA 4. European Aviation
Crisis Coordination Cell (EACCC)
CONTENT
![Page 3: IVATF/2 Montreal, 11 th – 15 th July 2011 FOLLOW UP TO VOLCEX 11/01 AND GRIMSV Ö TN](https://reader033.vdocuments.net/reader033/viewer/2022051623/56815928550346895dc650f5/html5/thumbnails/3.jpg)
Scenario: eruption of Grimsvötn
Aim: test effectiveness
of the amended
contingency plan
Newcomers:EACCC and Regulators
Participants:
EUR/NAT VOLCEX 11/01
http://www.paris.icao.int/Met/Volc_Ash/index.htm
V. ash exerciseVOLCEX 11/01 13/14 Apr 11
77 AOs, 14 ANSPs, 10 CAAs, 3 VAACs,
EUROCONTROL, EC & EASA
![Page 4: IVATF/2 Montreal, 11 th – 15 th July 2011 FOLLOW UP TO VOLCEX 11/01 AND GRIMSV Ö TN](https://reader033.vdocuments.net/reader033/viewer/2022051623/56815928550346895dc650f5/html5/thumbnails/4.jpg)
• Alert: Icelandic MWO VAAC CFMU Crisis Cell
SIGMET NOTA
M
VA AdvisoryAsh
concentration
• Information exchange: CDM teleconferences
• Information: VAAC
• Measures: ANSPs CFMU
• 13th – 14th April, 05.30 – 15.30 UTC
EVITA prototype
14th April: decisions to perform flights made by airlines based on
safety risk assessment• 13th April: States act in accordance with the
approach currently in force in each State
• 14th April: States act in accordance with the safety risk assessment approach
VOLCEX 11/01
![Page 5: IVATF/2 Montreal, 11 th – 15 th July 2011 FOLLOW UP TO VOLCEX 11/01 AND GRIMSV Ö TN](https://reader033.vdocuments.net/reader033/viewer/2022051623/56815928550346895dc650f5/html5/thumbnails/5.jpg)
GRIMSVÖTN – May 21st – 29th
• 21st May – ash plume up to 20km• Eurocontrol volcanic ash procedure
activated - NOP Portal, teleconferences• 22nd May - EACCC activated• 25th May – EVITA operational• Impact: Iceland, Scandinavia, UK,
Germany• ~900 flights cancelled• 29th May – end
![Page 6: IVATF/2 Montreal, 11 th – 15 th July 2011 FOLLOW UP TO VOLCEX 11/01 AND GRIMSV Ö TN](https://reader033.vdocuments.net/reader033/viewer/2022051623/56815928550346895dc650f5/html5/thumbnails/6.jpg)
VOLCEX 11/01 Debrief - Conclusions
• Future VOLCEX - focus, AO crisis cell, volcanologist
• EACCC - harmonising European response, communications/media
Reduce information overload !!!
Including Grimsvötn
EASA role
• Data/Information Flow - VAAC, MET, AIS, teleconferences, NOP Portal
• NOP Portal – “one stop shop”, EVITA
Observations, PIREPs
![Page 7: IVATF/2 Montreal, 11 th – 15 th July 2011 FOLLOW UP TO VOLCEX 11/01 AND GRIMSV Ö TN](https://reader033.vdocuments.net/reader033/viewer/2022051623/56815928550346895dc650f5/html5/thumbnails/7.jpg)
EVITA
7
EVITA- Input: ash concentration data, NOTAM, user defined areas- Output: charts, impacted flights, aerodromes, sectors
Since 1st July 2011 – local
training
http://www.cfmu.eurocontrol.int/j_nip/cfmu/public/standard_page/network_operations_evita.html
![Page 8: IVATF/2 Montreal, 11 th – 15 th July 2011 FOLLOW UP TO VOLCEX 11/01 AND GRIMSV Ö TN](https://reader033.vdocuments.net/reader033/viewer/2022051623/56815928550346895dc650f5/html5/thumbnails/8.jpg)
May 2010: European Aviation Crisis Coordination Cell
Lessons learnt from 2010 ash crisis
Network management
expertise
Political leadership
EASA
![Page 9: IVATF/2 Montreal, 11 th – 15 th July 2011 FOLLOW UP TO VOLCEX 11/01 AND GRIMSV Ö TN](https://reader033.vdocuments.net/reader033/viewer/2022051623/56815928550346895dc650f5/html5/thumbnails/9.jpg)
European Aviation Crisis Coordination Cell
(EACCC)
Coordinate management of response to thenetwork crisis affecting aviation in Europe
Activated when circumstances beyond normal environment of ops are evident
Members
EACCC
…
Airlines
ANSPMilitary
Airports
![Page 10: IVATF/2 Montreal, 11 th – 15 th July 2011 FOLLOW UP TO VOLCEX 11/01 AND GRIMSV Ö TN](https://reader033.vdocuments.net/reader033/viewer/2022051623/56815928550346895dc650f5/html5/thumbnails/10.jpg)
• 4 teleconferences held• More states have adopted SRA• EACCC recommends mutual recognition of SRA by NSAs • EASA established central repository with accepted AO SRAs
EACCC during Grimsvötn eruption
Actions:• EASA
– Use ICAO IVATF draft guidance material to develop a reference material in Europe
– Organise a workshop for NSAs
• AOs – submit SRAs to NSAs• UK and Irish CAA - work with VAAC London and other
EUR MET providers on improving ash concentration charts
• EACCC - report to Ministers: still different approaches
![Page 11: IVATF/2 Montreal, 11 th – 15 th July 2011 FOLLOW UP TO VOLCEX 11/01 AND GRIMSV Ö TN](https://reader033.vdocuments.net/reader033/viewer/2022051623/56815928550346895dc650f5/html5/thumbnails/11.jpg)
Crisis management
Safety RiskAssessment
approachEVITA
Ash concentrationcharts/data
IN
SUMMARY
Changes in
Europe
EACCC
Still a lot of work ahead …