GENERAL NOTES
1. ALL CONTRACTORS MUST MAKE AN ON SITE INSPECTION WITH SHERIDAN COLLEGE'S PROJECT COORDINATOR PRIOR TO SUBMITTING ANY TENDERS. NO
EXTRAS WILL BE ALLOWED AFTER THE LETTING OF THE CONTRACT FOR ANY EVENTUALITIES WHICH MAY HAVE BEEN FORESEEN BY SUCH PRIOR
INSPECTION.
2. THE WORK SITE IS LOCATED AT THE TRAFALGAR CAMPUS IN OAKVILLE.
3. THE CONTRACTOR IS TO VERIFY ALL DIMENSIONS ON SITE AND REPORT ANY DISCREPANCIES TO SHERIDAN P.C. PRIOR TO TENDER CLOSING. WRITTEN
DIMENSIONS ARE TO TAKE PRECEDENCE OVER SCALED DIMENSIONS.
4. ALL CONTRACTORS AND SUBCONTRACTORS SHALL ADHERE TO LATEST EDITION OF THE PLUMBING CODE, ONTARIO ELECTRICAL SAFETY CODE, ONTARIO
BUILDING CODE AND MUNICIPAL REGULATIONS.
5. PERSONAL PROTECTIVE EQUIPMENT MUST BE WORN BY WORKERS AT ALL TIMES (IE. SAFETY FOOTWEAR, HATS, GLASSES, ETC.) WHERE APPLICABLE.
FAILURE TO DO SO MAY RESULT IN SUSPENSION OR CONTRACT TERMINATION.
6. SHERIDAN COLLEGE BUILDING AND PROPERTIES CONTAIN HAZARDOUS ELECTRICAL LINES & EQUIPMENT. SHERIDAN COLLEGE MUST BE INFORMED
AHEAD OF TIME OF ANY SITE VISITS, INSPECTIONS OR WORK BY CONTRACTORS AT ALL TIMES IN OR AROUND COLLEGE. PRIOR TO CONSTRUCTION, UNDER
NO CIRCUMSTANCES SHALL A CONTRACTOR, THEIR REPRESENTATIVES OR WORKERS ENTER COLLEGE PROPERTY WITHOUT SIGNING IN WITH SECURITY.
THESE RESTRICTIONS APPLY TO ALL SUBCONTRACTORS EMPLOYED BY THE GENERAL CONTRACTOR. PLEASE CONTACT SHERIDAN COLLEGE'S PROJECT
COORDINATOR TO MAKE ARRANGEMENTS.
7. UPON AWARD OF CONTRACT, CONTRACTOR TO PROVIDE DETAILED CONSTRUCTION SCHEDULE.
8. SUBMIT ALL SHOP DWGS + SPECIFICATIONS TO SHERIDAN P.C. FOR REVIEW AND APPROVAL
9. SHERIDAN TO BE NOTIFIED OF ALL NOISY ACTIVITIES WHICH MAY DISTURB SURROUNDING; STUDENTS, FACULTY + STAFF. COORDINATE W/ SHERIDAN.
10. WORK SHALL BE EXECUTED BY EXPERIENCED WORKERS WITH RESPECT TO THE DUTIES FOR WHICH THEY ARE EMPLOYED.
11. KEEP PREMISES FREE FROM ACCUMULATION OF WASTE MATERIALS & RUBBISH. UPON COMPLETION OF WORK, CLEAN AND REMOVE FROM WORK SITE
ALL DEBRIS, SURPLUS MATERIAL, TOOLS & EQUIPMENT OF THE TRADES. LEAVE THE BUILDING AND THE SITE IN A NEAT AND TIDY CONDITION TO THE
SATISFACTION OF THE PROJECT COORDINATOR.
12. ANY FINISHES THAT MAY BE DAMAGED DURING THE COURSE OF THIS WORK TO BE MADE GOOD AS PER EXISTING AND THE SATISFACTION OF SHERIDAN
COLLEGE'S PROJECT COORDINATOR.
13. REFER TO THE TECHNICAL REQUIREMENTS ON DRAWINGS.
14. CONTRACTOR(S) ARE RESPONSIBLE TO PAY FOR ON-SITE DAILY PARKING PERMIT(PAY-BY-PLATE) AND TO PARK IN THE CONTRACTOR DESIGNATED
PARKING SPACES ONLY, UNLESS OTHERWISE NOTED. FAILURE TO OBTAIN PARKING PERMIT MAY RESULT IN FINES TO THE CONTRACTOR(S) NOT AT THE
EXPENSE OF SHERIDAN COLLEGE.
15. CONTRACTOR(S) ARE RESPONSIBLE TO SIGN IN AND SIGN OUT AT THE SECURITY DESK ON A DAILY BASIS.
16. UPON PROJECT COMPLETION, GENERAL CONTRACTOR SHALL PROVIDE SHERIDAN WITH CLOSE-OUT DOCUMENTATION (2 HARD COPIES AND 1 ELECTRONIC
COPY SUBMISSION OF DRAWINGS, LETTER(S) OF WARRANTY, SUB-TRADE CONTRACT INFORMATION, AS-BUILT(S), TEST REPORTS, INSPECTIONS, PERMITS,
SHOP DRAWINGS, MAINTENANCE AND OPERATION MANUALS, PRODUCT DATA SHEETS, SCHEDULES, ETC.)
SHERIDAN COLLEGE PROJECT MANAGER
NATHAN CASE, FACILITIES PROJECTS
(905) 845-9430 x2433
SHERIDAN COLLEGE PROJECT MANAGER
SHAMSA KASSIM, FACILITIES PROJECTS
(905) 845-9430 x8082 M:416 886 2449
Davis Campus
7899 McLaughlin Road
Brampton, ON
L6Y 5G5
J106
CHILD & YOUTH CARE LAB
CONTACT INFORMATION
DRAWING INDEX
ARCHITECTURAL:
DWG No. DWG TITLE
A1 SITE & KEY PLAN
A2 ARCHITECTURAL NOTES & ABBREVIATION
A3 DEMOLITION FLOOR PLAN
A4 DEMOLITION CEILING PLAN
A5 PROPOSED FLOOR PLAN
A6 PROPOSED CEILING PLAN
A7 PROPOSED FURNITURE PLAN
A8 ELEVATIONS & DETAILS
A9 ELEVATIONS
A10 ELEVATIONS
MECHANICAL:
DWG No: DWG TITLE
M-0 TITLE SHEET
M-1.1 GENERAL MECHANICAL SPECIFICATIONS
M-1.2 HVAC SPECIFICATIONS
M-1.3 HYDRONIC SYSTEMS SPECIFICATIONS
M-1.4 PLUMBING SPECIFICATIONS
M-1.5 FIRE PROTECTION SPECIFICATIONS AND LEGEND I
M-1.6 MECHANICAL LEGEND II
M-1.7 MECHANICAL SCHEDULES AND DETAILS
M-2.1 LAB DEMOLITION FLOOR PLAN - HVAC
M-2.2 NEW LAB FLOOR PLAN - HVAC
M-2.3 NEW LAB FLOOR PLAN - HVAC PIPING
M-3.1 NEW LAB FLOOR PLAN - PLUMBING AND DRAINAGE
M-4.1 NEW LAB FLOOR PLAN - FIRE PROTECTION
ELECTRICAL:
DWG No. DWG TITLE
E1 ELECTRICAL NOTES & SPECIFICATIONS
E2 POWER & SYSTEMS DEMOLITION PLAN
E3 LIGHTING DEMOLITION PLAN
E4 POWER & SYSTEMS PROPOSED PLAN
E5 LIGHTING PROPOSED PLAN
E6 ELECTRICAL - DALI DETAILS
UP
UP
UP
J1
24
a
J1
24
b
J1
24
cJ1
24
d
J1
09
J1
09
a
J1
09
b
J1
07
J1
05
J1
03
J1
01
J1
00
a
J1
00
J1
02
J1
04
J1
06
J1
06
a
J1
08
a
J1
08
b
J1
20
J1
12
J1
10
J1
16
J1
16
a
J1
25
J1
22
J1
22
a
JS
10
1
JS
10
2
JS
10
3
JS
10
4
I.T
.
EL
EV
AT
OR
MA
CH
IN
E R
M
SP
RIN
KLE
R
RM
TIM
H
OR
TO
NS
B.F
. W
/R
M
EL
EC
TR
IC
AL
RM
20
4 F
t.²
201
F
t.²
33
1 F
t.²
72
5 F
t.²
22
2 F
t.²
34
9 F
t.²
45
9 F
t.²
12
37
F
t.²
32
7 F
t.²
12
54
F
t.²
961
F
t.²
36
4 F
t.²
33
6 F
t.²
733
8 F
t.²
10
8 F
t.²
85
F
t.²
44
F
t.²
71 F
t.²
EL
EV
.
NO
.2
EL
EV
.
NO
.1
20
89
F
t.²
90
0 F
t.²
227
Ft.²
57
8 F
t.²
10
3 F
t.²
18
0 F
t.²
25
7 F
t.²
263
F
t.²
23
4 F
t.²
J124e
OF
FIC
E
320 S
Q.F
T
J124d
OF
FIC
E
204 S
Q.F
T
J124c
OF
FIC
E
201 S
Q.F
T
J124b
OF
FIC
E
331 S
Q.F
T
J109
WO
RK
RO
OM
725 S
Q.F
T
J109a
CH
EC
K O
UT
222 S
Q.F
T
J109b
BO
OK
D
RO
P
J107
I.T
.
349 S
Q.F
T.
J120
ELE
V.M
AC
H. R
OO
M
108 S
Q.F
T
J112
B.F
. W
AS
HR
OO
M
85 S
Q.F
T
J108b
ME
NS
282 S
Q.F
T
J110
ELE
CT
RIC
AL R
OO
M
336 S
Q.F
T
J108a
WO
ME
NS
282 S
Q.F
T
J116
ST
OR
AG
E
459 S
Q.F
T
J122
CO
RR
ID
OR
578 S
Q.F
T
ELE
V. 1
ELE
V.2
J124a
LE
AR
NIN
G C
OM
MO
NS
7338 S
Q.F
T
J122a
VE
ST
IB
ULE
103 S
Q.F
T
J116a
SP
RIN
KLE
R R
OO
M
44 S
Q.F
T
J125
CO
RR
ID
OR
180 S
Q.F
T
J106a
OB
SE
RV
AT
IO
N
327 S
Q.F
T
J106
CO
NS
ULT
AT
IO
N LA
B
1237 S
Q.F
T
J104
CLA
SS
RO
OM
1254 S
Q.F
T.
J100a
ST
UD
Y A
RE
A
227 S
Q.F
T
J102
JA
N.
71 S
Q.F
T
J101
CLA
SS
R
OO
M
961 S
Q.F
T.S
Q.F
T
J103
TIM
H
OR
TO
NS
364 S
Q.F
T.
J105
LO
UN
GE
900 S
Q.F
T.
J100
CO
RR
ID
OR
-0"
-0"
-0"
J5
J4
J3
J2
J1
J6
J7
A C
R
A C
R
A C
R
A C
R
2
S1
J-WING - FIRST FLOOR
NTS
Davis Campus
7899 McLauglin Road
Brampton, ON
(905) 459-7533
SITE & KEY PLAN
AS NOTED
A1
-
· Dispose of all material and debris within scope of
work offsite
· Make good of all areas affected by work to Sheridan
Standards.
· Coordinate all required testing and inspections
· Protect furniture, equipment and items to remain (ie.
flooring) during construction.
· Electrical Contractor shall verify capacity and location
of electrical panel required to complete scope of
work.
· Data Contractor shall verify capacity and location of
wiring closet required to complete scope of work.
· Refer to tender, specifications, instructions and all
other documents related to scope of work to complete
project.
Project Specific:
Drawn By:
Drawing No.:
Checked By:
· Drawings are meant to be read, and not scaled
· Dimensions to be verified on site
· Contractors must check and verify all dimensions and
report discrepancies to the Project Coordinator before
commencing with work
· All drawings remain the property of Sheridan College
and shall not be reproduced or reused without written
consent.
Construction North True North
General Notes:
Issues/RevisionsNo.
Project Name:
Seal:
Sheet Name:
Consultant(s):
Date
Issued Date:
Revision: Scale:
J106
CHILD & YOUTH CARE LAB
1
ISSUED FOR TENDER 05/19
S.K. N.C.
04-2019
N
N
PROJECT LOCATION
PARKING
X
1
S1
DAVIS CAMPUS SITE PLAN
NTS
J-WING
CENTRE
STUDENT
RESIDENCE
ANNEX
BUILDING
H-WING
BUILDING
STUDENT
CENTRE
McLAUGHLIN
BUILDING
GRAVEL ROAD
OVERFLOW
PARKING
M
cLA
U
G
H
LIN
R
O
A
D
COMMERCIAL
RETAIL
CENTRE
BRAMPTON SPORTS
CENTRE
COLLEGE
GATEWAY
LONG TERM
CARE CENTRE
(BY OTHERS)
SHERIDAN COLLEGE DR.
FACILITIES PARKING
LOT
MA
IN
TE
NA
NC
E
YA
RD
POND
WOODED
AREA
WOODED
AREA
STEELS AVENUE
WOODED
AREA
SPORTS
FIELD
B-WING
BUILDING
C-WING
SCOPE OF WORK
J106
ENTRANCE
DENOTES EXISTING TO BE
REMOVED
D
DENOTES EXISTING TO REMAINE
DENOTES EXISTING TO BE
RELOCATED
R
DENOTES EXISTING IN RELOCATED
POSITION
RP
DENOTES WEATHERPROOFWP
GROUND FAULT INTERRUPTERGFI
DENOTES DEVICE TO BE MOUNTED
COUNTER HEIGHT
CH
DENOTES DEVICE TO BE FLUSH
MOUNTED IN MILLWORK
MW
DENOTES WIRE GUARDWG
DENOTES KEY OPERATEDK
DENOTES TWIST LOCKTL
WITHW/
COMPLETE WITHC/W
GYPSUM WALLBOARDGWB
GEORGIAN WIRED GLASSGWG
ON CENTRE (s)O/C
TYPICALTYP
REVERSE OSMOSISRO
COLD WATERCW
HOT WATERHW
ABBREVIATIONS:
ACOUSTICAL TILE/PANELACT
BOTH SIDESB/S
ABOVE FINISHED FLOORAFF
CENTRE ON CENTREC/C
DIAMETERDIA
DRAWINGDWG
EQUALEQ
HOLLOW METALHM
HEATING/ VENTILATION/ AIR
CONDITIONING
HVAC
NOT TO SCALENTS
OPEN WEB STEEL JOISTOWSJ
UNDERSIDEU/S
RUBBER BASERB
STAINLESS STEELSS
TELEPHONETEL
TELEVISIONTV
VACUUMV
GASG
COMPRESSED AIRCA
FLOOR DRAINFD
SYMBOL DEFINITION
CIRCUITCCT
QUANTITYQTY
DENOTES SHERIDAN NETWORK
(RELATES TO DATA DROP
REQUIREMENTS)
S
DENOTES LOCAL NETWORK
(RELATES TO DATA DROP
REQUIREMENTS)
L
LEGENDS:
1
AX
1
AX
1
AX
1
AX
1
ARCHITECTURAL:
####
SPECIFICATION / MATERIAL TAG
SYMBOL DEFINITION
PARTITION / WALL TAG
EXTERIOR ELEVATION MARKER
INTERIOR ELEVATION MARKER
SECTION MARKER
DETAIL CALL OUT
PAINT COLOR TAG
P1
FLOOR TYPE TAG
F#
WINDOW TAG
DOOR TAG
W#
D#
EXISTING ELEVATION
NEW ELEVATION
0
0
0
.
0
0
0
000.000
BB11
FM Office
- sq ft.
ROOM TAG
EXISTING WALL ASSEMBLY TO
REMAIN
NEW WALL ASSEMBLY
EXISTING WALL ASSEMBLY TO BE
DEMOLISHED
LINE TYPE DENOTES EXISTING
OBJECT TO REMAIN
LINE TYPE DENOTES EXISTING
OBJECT TO BE DISPOSED OFFSITE
OR DISASSEMBLED AND
RELOCATED - REFER TO NOTES FOR
FURTHER INSTRUCTION
MISCELLANEOUS:
DENOTES REFER TO NOTE (s)
SYMBOL DEFINITION
DENOTES GENERAL TASK (s) FOR
SCOPE OF WORK AREA
1
1
GENERAL CONSTRUCTION NOTES
1. MATERIALS, CONSTRUCTION & INSTALLATION METHODS SHALL COMPLY WITH
THE LATEST EDITION OF THE ONTARIO BUILDING CODE CONTAINING O. REG.
350/06, REGIONAL MUNICIPALITY PUBLIC WORKS DEPARTMENT AND THE
LOCAL BUILDING DEPARTMENT AND FIRE DEPARTMENT BY-LAWS DESIGN
CRITERIA, CONSTRUCTION STANDARDS AND SPECIFICATIONS. ALL WORK
SHALL ALSO COMPLY WITH OTHER CODES, STANDARDS AND REGULATIONS
REFERRED TO IN THE ABOVE DOCUMENTS AND ADOPTED BY THE AUTHORITIES
HAVING JURISDICTION.
2. IF DRAWINGS & SPECIFICATIONS CONFLICT WITH REGULATIONS & BY-LAWS,
CONTRACTOR(S) SHALL NOTIFY CONSULTANT IN WRITING FOR CLARIFICATION.
IN NO INSTANCE REDUCE STANDARDS OF DRAWINGS BY APPLYING ANY
CODES OR STANDARDS. ALL MATERIALS AND METHODS MUST AT LEAST
MATCH EXISTING BASE BUILDING STANDARDS - BUILDING OWNER /
OPERATOR TENANT MECHANICAL REQUIREMENTS FORM AN INTEGRAL PART OF
THESE SPECIFICATIONS.
3. DRAWINGS ONLY SHOW GENERAL INTENT AND SCOPE OF WORK AND NOT
EXACT DETAILS OF INSTALLATION. CONTRACTOR SHALL PROVIDE ALL
MATERIALS & ACCESSORIES NECESSARY FOR COMPLETE AND FULLY
OPERATIONAL MECHANICAL SYSTEMS SHOWN. BEFORE SUBMITTING PRICES,
CONTRACTORS SHALL REVIEW ALL PERTINENT DRAWINGS & ANY RELEVANT
ON-SITE CONDITIONS TO VERIFY THAT WORK CAN BE CARRIED OUT AS
SHOWN ON DRAWINGS. NO CLAIMS FOR EXTRA PAYMENTS WILL BE
CONSIDERED FOR FAILURE TO DO SO. CONTRACTOR(S) WILL ALSO MAKE
ALLOWANCES IN TENDERING FOR SPACE LIMITATIONS & THE SIMULTANEOUS
WORKING OF DIFFERENT TRADES. ANY DRAWING OF FLOOR SLABS MUST BE
CARRIED OUT AS PER BUILDING MANAGER'S STANDARDS, WITH X-RAY IF
REQUIRED.
4. THE CONSULTANT RESERVES THE RIGHT TO MAKE REASONABLE CHANGES
REQUIRED TO ACCOMMODATE CONDITIONS ARISING DURING THE PROGRESS OF
THE WORK, AT NO EXTRA COST TO THE OWNER.
5. CONTRACTORS SHALL MAINTAIN MARKED-UP PRINTS OF "AS-BUILT"
CONDITIONS AS THE JOB PROGRESSES AND, AT THE END OF CONSTRUCTION,
CONTRACTOR SHALL OBTAIN & PAY FOR ONE SET OF REPRODUCIBLE
DRAWINGS AND TRANSFER ALL "AS-BUILT" CONDITIONS TO THESE DRAWINGS.
THESE DOCUMENTS, SHOWING APPROXIMATE FINAL LOCATIONS & ELEVATIONS
OF ALL MECHANICAL SYSTEMS, ESPECIALLY ANY BURIED & CONCEALED
WORKS, SHALL BE PROVIDED TO THE CONSULTANT FOR REVIEW & RECORD.
6. CONTRACTORS SHALL PROVIDE SIX COPIES OF CLEARLY IDENTIFIED, PROJECT
SPECIFIC, SHOP DRAWINGS FOR ALL FIXTURES AND EQUIPMENT FOR
APPROVAL BEFORE ORDERING. EQUIPMENT, DEVICES & FIXTURES SHALL BE
SUPPLIED WITH ALL ACCESSORIES REQUIRED FOR A COMPLETE INSTALLATION.
CONTRACTOR WILL REVIEW SHOP DRAWINGS PRIOR TO SUBMISSION, THUS
INDICATING THAT HE HAS DETERMINED & VERIFIED THAT ALL MATERIALS,
CATALOG NUMBERS ETC., PERFORMANCES, SIZES AND AVAILABLE SPACE AND
FIELD CONDITIONS MEET THE REQUIREMENTS OF THE CONTRACT DOCUMENTS.
ALL MATERIALS USED MUST BE NEW, CLEAN AND FREE OF DEFECTS.
7. AT THE END OF THE PROJECT, CONTRACTORS SHALL PROVIDE 4 OPERATING
AND MAINTENANCE INSTRUCTION MANUALS WITH WARRANTIES, CERTIFICATIONS,
REPORTS, OPERATING INSTRUCTIONS AND A COPY OF CONSULTANT REVIEWED
SHOP DRAWINGS.
8. CONTRACTORS SHALL ONLY MAINTAIN QUALIFIED PERSONNEL & SUPPORTING
STAFF, AT THE SITE, WHO ARE EXPERIENCED IN COMPARABLE PROJECTS. IF
THE BUILDING MANAGER REQUIRES WORK TO BE DONE AFTER HOURS, THIS
MUST BE ALLOWED FOR AND ARRANGEMENTS MADE BY THE CONTRACTOR
FOR ACCESS. CONTRACTORS SHALL BE RESPONSIBLE FOR MAINTAINING
GOOD ORDER AND DISCIPLINE AMONG THEIR EMPLOYEES, AND FOR REMOVING
DEBRIS AND MAINTAINING A CLEAN WORK AREA, DURING, AND UPON
COMPLETION OF THE PROJECT.
9. CONTRACTORS SHALL WARRANTY HIS WORK, PARTS AND LABOR, FOR A
PERIOD OF 1 YEAR FROM THE DATE OF ACCEPTANCE BY THE OWNER.
Davis Campus
7899 McLauglin Road
Brampton, ON
(905) 459-7533
AS NOTED
A2
-
· Dispose of all material and debris within scope of
work offsite
· Make good of all areas affected by work to Sheridan
Standards.
· Coordinate all required testing and inspections
· Protect furniture, equipment and items to remain (ie.
flooring) during construction.
· Electrical Contractor shall verify capacity and location
of electrical panel required to complete scope of
work.
· Data Contractor shall verify capacity and location of
wiring closet required to complete scope of work.
· Refer to tender, specifications, instructions and all
other documents related to scope of work to complete
project.
Project Specific:
Drawn By:
Drawing No.:
Checked By:
· Drawings are meant to be read, and not scaled
· Dimensions to be verified on site
· Contractors must check and verify all dimensions and
report discrepancies to the Project Coordinator before
commencing with work
· All drawings remain the property of Sheridan College
and shall not be reproduced or reused without written
consent.
Construction North True North
General Notes:
Issues/RevisionsNo.
Project Name:
Seal:
Sheet Name:
Consultant(s):
Date
Issued Date:
Revision: Scale:
J106
CHILD & YOUTH CARE LAB
1
ISSUED FOR TENDER 05/19
S.K. N.C.
04-2019
N N
ARCHITECTURAL NOTES &
ABBREVIATIONS
J125
CORRIDOR
180 SQ.FT
J106a
OBSERVATION
327 SQ.FT
J106
CONSULTATION LAB
1237 SQ.FT
DEMOLITION FLOOR PLAN
1
A3
DEMOLITION FLOOR PLAN
3/16" = 1'-0"
NOTES:
Davis Campus
7899 McLauglin Road
Brampton, ON
(905) 459-7533
AS NOTED
A3
-
· Dispose of all material and debris within scope of
work offsite
· Make good of all areas affected by work to Sheridan
Standards.
· Coordinate all required testing and inspections
· Protect furniture, equipment and items to remain (ie.
flooring) during construction.
· Electrical Contractor shall verify capacity and location
of electrical panel required to complete scope of
work.
· Data Contractor shall verify capacity and location of
wiring closet required to complete scope of work.
· Refer to tender, specifications, instructions and all
other documents related to scope of work to complete
project.
Project Specific:
Drawn By:
Drawing No.:
Checked By:
· Drawings are meant to be read, and not scaled
· Dimensions to be verified on site
· Contractors must check and verify all dimensions and
report discrepancies to the Project Coordinator before
commencing with work
· All drawings remain the property of Sheridan College
and shall not be reproduced or reused without written
consent.
Construction North True North
General Notes:
Issues/RevisionsNo.
Project Name:
Seal:
Sheet Name:
Consultant(s):
Date
Issued Date:
Revision: Scale:
J106
CHILD & YOUTH CARE LAB
1
ISSUED FOR TENDER 05/19
S.K. N.C.
04-2019
NN
1
3
4
REMOVE AND DISPOSE OFFSITE EXISTING FLOORING AND
WALL BASE THROUGHOUT, UNLESS WHERE OTHERWISE
NOTED.
5
DISASSEMBLE AND DISPOSE OFF SITE ALL FURNITURE
UNLESS OTHERWISE NOTED.
COORDINATE SCOPE OF MECHANICAL, ELECTRICAL, AND
PLUMBING DEMOLITION DRAWINGS. SEE SPECIFICATIONS.
REMOVE AND PROTECT TACK BOARD AND WHITE BOARD TO BE
REUSED IN SAME SPACE. PLEASE REFER TO PROPOSED FLOOR
PLAN AND ELEVATIONS. COORDINATE WITH SHERIDAN P.M.
1
1
1
2 KEEP AND PROTECT EXISTING PROJECTOR WITH ITS CAGE.
2
1
1
1
J125
CORRIDOR
180 SQ.FT
J106a
OBSERVATION
327 SQ.FT
J106
CONSULTATION LAB
1237 SQ.FT
9
'
-
8
"
9
'
-
8
"
9
'
-
8
"
9
'
-
8
"
9
'
-
8
"
9
'
-
8
"
DEMOLITION CEILING PLAN
1
A4
DEMOLITION CEILING PLAN
3/16" = 1'-0"
NOTES:
Davis Campus
7899 McLauglin Road
Brampton, ON
(905) 459-7533
AS NOTED
A4
-
· Dispose of all material and debris within scope of
work offsite
· Make good of all areas affected by work to Sheridan
Standards.
· Coordinate all required testing and inspections
· Protect furniture, equipment and items to remain (ie.
flooring) during construction.
· Electrical Contractor shall verify capacity and location
of electrical panel required to complete scope of
work.
· Data Contractor shall verify capacity and location of
wiring closet required to complete scope of work.
· Refer to tender, specifications, instructions and all
other documents related to scope of work to complete
project.
Project Specific:
Drawn By:
Drawing No.:
Checked By:
· Drawings are meant to be read, and not scaled
· Dimensions to be verified on site
· Contractors must check and verify all dimensions and
report discrepancies to the Project Coordinator before
commencing with work
· All drawings remain the property of Sheridan College
and shall not be reproduced or reused without written
consent.
Construction North True North
General Notes:
Issues/RevisionsNo.
Project Name:
Seal:
Sheet Name:
Consultant(s):
Date
Issued Date:
Revision: Scale:
J106
CHILD & YOUTH CARE LAB
1
ISSUED FOR TENDER 05/19
S.K. N.C.
04-2019
N N
1
2
COORDINATE SCOPE OF MECHANICAL, ELECTRICAL, AND
PLUMBING DEMOLITION AND PROPOSED DRAWINGS.
DEMOLISH AND DISPOSE OFFSITE ALL EXISTING CEILING
TILES, ALL SUSPENDED CEILING HANGERS, AND T-BARS,
UNLESS OTHERWISE NOTED.
3 MODIFY ALL FIRE DEVICES AND SPEAKERS TO ACCOMMODATE
NEW CEILING FINISH.
41'-0"10'-10"
7'-10"
29
'-8
"
5'-3
3
4
"
1'-3"
3'-10
1
2
"4'-0
1
2
"
7'-10"1'-3"
5'-5
1
8
"3'-10
1
2
"5'-8
5
8
"
J125
CORRIDOR
180 SQ.FT
J106a
OBSERVATION
327 SQ.FT
J106
CONSULTATION LAB
1237 SQ.FT
29
'-8
"
16
'-4
"
19'-0"22'-0"
1'-3" 1'-5"
P1
P1
1
A9
1
A10
3
A9
3
A10
2
A10
4
A10
5
A10
P2P2P2P2 P2
P2
P2
P2P2P2
P2
P2
P2
F1
F1
2
A9
F2
F1 F2
P2
P4
P3
P3
P4
FLOORING SCHEDULE
SIZE: 9.85" X 39.4"
F1
CARPET FLOORING 1
MILLIKEN - FLOOR COVERING
COLOUR: DRY DOCK COL 126-5
SIZE: 9.85" X 39.4"
CARPET FLOORING 2
MILLIKEN - FLOOR COVERING
COLOUR: FELT GREY COL 5
SIZE: 9.85" X 39.4"
CARPET FLOORING 3
MILLIKEN - FLOOR COVERING
COLOUR: OCEAN MIST COL 126
WALL BASE: JOHNSONITE - TRADITION 20
CHARCOAL WG
PROFILE/ HEIGHT: HIGH COVE/ 4"
SIZE: 9.85" X 39.4"
F2
VINYL FLOORING 4
MILLIKEN - PIKE IN CLOUD
COLOUR: PIK144 VERTICAL ASHLAR
P1
P2
P3
PAINT SCHEDULE
ACCENT WALL
SW - 6790 ADRIATIC SEA, SATIN FINISH
WALLS
SW - 7646 FIRST STAR, SATIN FINISH
P4
DOORS
SW - 7646 FIRST STAR, SATIN FINISH
DOOR FRAMES
SW - 7645 THUNDER GRAY, SCUFF-X,
PEARL (BENJAMIN MOORE)
PROPOSED FLOOR PLAN
1
A5
PROPOSED FLOOR PLAN
3/16" = 1'-0"
NOTES:
Davis Campus
7899 McLauglin Road
Brampton, ON
(905) 459-7533
AS NOTED
A5
-
· Dispose of all material and debris within scope of
work offsite
· Make good of all areas affected by work to Sheridan
Standards.
· Coordinate all required testing and inspections
· Protect furniture, equipment and items to remain (ie.
flooring) during construction.
· Electrical Contractor shall verify capacity and location
of electrical panel required to complete scope of
work.
· Data Contractor shall verify capacity and location of
wiring closet required to complete scope of work.
· Refer to tender, specifications, instructions and all
other documents related to scope of work to complete
project.
Project Specific:
Drawn By:
Drawing No.:
Checked By:
· Drawings are meant to be read, and not scaled
· Dimensions to be verified on site
· Contractors must check and verify all dimensions and
report discrepancies to the Project Coordinator before
commencing with work
· All drawings remain the property of Sheridan College
and shall not be reproduced or reused without written
consent.
Construction North True North
General Notes:
Issues/RevisionsNo.
Project Name:
Seal:
Sheet Name:
Consultant(s):
Date
Issued Date:
Revision: Scale:
J106
CHILD & YOUTH CARE LAB
1
ISSUED FOR TENDER 05/19
S.K. N.C.
04-2019
NN
1 PROVIDE BACKING IN DRY WALL IN ALL AREAS WHERE THERE
WILL BE CABINETS, SINK, WHITE BOARD AND TACK BOARD.
REFER TO PROPOSED FURNITURE PLAN AND ELEVATIONS
FOR LOCATIONS. TO BE COORDINATED ON SITE TOO.
3
PATCH & PREP FLOOR TO ACCOMMODATE NEW FLOORING
2
PREP AND PATCH WALL FOR PAINTING, REFER TO PAINT
SCHEDULE FOR PROPOSED PAINT COLORS. UNLESS
OTHERWISE NOTED
4
SUPPLY AND INSTALL FLOORING, TRANSITION STRIP(S) AND
WALL BASE AS PER SPECIFICATIONS AND DRAWING.
5
6
TRENCH PATHWAYS TO ACCOMMODATE SERVICES AS PER
DRAWINGS. COORDINATE WITH MECHANICAL AND ELECTRICAL
FOR ADDITIONAL PATCH WORK/FLOORING. BACKFILL AND
POUR CONCRETE UPON SERVICE RUN COMPLETION.
RE-INSTALL TACK BOARDS AND WHITE BOARD ON NEW
LOCATIONS. REFER TO ELEVATIONS AND FURNITURE PLAN.
7
COORDINATE WASHROOM FLOORING INSTALL WITH SHERIDAN
COLLEGE. TO BE INSTALLED BY OTHERS.
DOOR TO BE PAINTED ONLY INSIDE OF THE ROOM.8
8
J125
CORRIDOR
180 SQ.FT
J106a
OBSERVATION
327 SQ.FT
J106
CONSULTATION LAB
1237 SQ.FT
9'-8"
9'-8"
9'-8"
9'-8"
9'-8"
S
S
S
S
S
S
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
EMG
PROPOSED CEILING PLAN
1
A6
PROPOSED CEILING PLAN
3/16" = 1'-0"
NOTES:
Davis Campus
7899 McLauglin Road
Brampton, ON
(905) 459-7533
AS NOTED
A6
-
· Dispose of all material and debris within scope of
work offsite
· Make good of all areas affected by work to Sheridan
Standards.
· Coordinate all required testing and inspections
· Protect furniture, equipment and items to remain (ie.
flooring) during construction.
· Electrical Contractor shall verify capacity and location
of electrical panel required to complete scope of
work.
· Data Contractor shall verify capacity and location of
wiring closet required to complete scope of work.
· Refer to tender, specifications, instructions and all
other documents related to scope of work to complete
project.
Project Specific:
Drawn By:
Drawing No.:
Checked By:
· Drawings are meant to be read, and not scaled
· Dimensions to be verified on site
· Contractors must check and verify all dimensions and
report discrepancies to the Project Coordinator before
commencing with work
· All drawings remain the property of Sheridan College
and shall not be reproduced or reused without written
consent.
Construction North True North
General Notes:
Issues/RevisionsNo.
Project Name:
Seal:
Sheet Name:
Consultant(s):
Date
Issued Date:
Revision: Scale:
J106
CHILD & YOUTH CARE LAB
1
ISSUED FOR TENDER 05/19
S.K. N.C.
04-2019
N N
1SUPPLY AND INSTALL 24" X 24" T.BAR AND TILES AS PER
SPECIFICATIONS. REFER TO DRAWING FOR FINISHED
HEIGHTS. ENSURE ALL FURNITURE, WALLS, FLOORING ARE
PROTECTED. COORDINATE FINAL HEIGHTS WITH P.M. PRIOR
TO INSTALL.
NOTE:
T.BAR LAYOUT TO MATCH DRAWING, COORDINATE WITH
LIGHTING LAYOUT. VERIFY WITH SHERIDAN COLLEGES P.M.
PRIOR TO INSTALL.
SPECIFICATION: ARMSTRONG - ULTIMA LAY-IN - 1910 FINE
TEXTURE 24"X24"x3/4", GRID FACE 15/16", SQUARE LAY-IN,
WHITE
2
3
REFER TO MECHANICAL DRAWINGS FOR PROPOSED H.V.A.C.
4
REFER TO ELECTRICAL DRAWINGS FOR PROPOSED LIGHTING.
RELOCATE ALL FIRE DEVICES TO ACCOMMODATE NEW
CEILING FINISH
J125
CORRIDOR
180 SQ.FT
J106a
OBSERVATION
327 SQ.FT
J106
CONSULTATION LAB
1237 SQ.FT
EXISTING
VERTICAL
TACK BOARD
EXISTING
VERTICAL
TACK BOARD
48 - STRIVE STACKING CHAIRS WITH CASTERS
24 - MOBILE FLIP TABLES WITH CASTERS
8 - STORAGE UNITS
2 - VERTICAL EXISTING TACK BOARDS
EXISTING
TACK BOARD
TABLE STORAGE AREA
CHAIR
STORAGE
AREA
MICROWAVE
CAPGCCAPDHCAPQTCAPMCCAPMGCAPPN
CHAIR
STORAGE
AREA
CAPGCCAPDHCAPQTCAPMCCAPMGCAPPN
PROPOSED FURNITURE
PLAN
1
A7
PROPOSED FURNITURE PLAN
3/16" = 1'-0"
NOTES:
Davis Campus
7899 McLauglin Road
Brampton, ON
(905) 459-7533
AS NOTED
A7
-
· Dispose of all material and debris within scope of
work offsite
· Make good of all areas affected by work to Sheridan
Standards.
· Coordinate all required testing and inspections
· Protect furniture, equipment and items to remain (ie.
flooring) during construction.
· Electrical Contractor shall verify capacity and location
of electrical panel required to complete scope of
work.
· Data Contractor shall verify capacity and location of
wiring closet required to complete scope of work.
· Refer to tender, specifications, instructions and all
other documents related to scope of work to complete
project.
Project Specific:
Drawn By:
Drawing No.:
Checked By:
· Drawings are meant to be read, and not scaled
· Dimensions to be verified on site
· Contractors must check and verify all dimensions and
report discrepancies to the Project Coordinator before
commencing with work
· All drawings remain the property of Sheridan College
and shall not be reproduced or reused without written
consent.
Construction North True North
General Notes:
Issues/RevisionsNo.
Project Name:
Seal:
Sheet Name:
Consultant(s):
Date
Issued Date:
Revision: Scale:
J106
CHILD & YOUTH CARE LAB
1
ISSUED FOR TENDER 05/19
S.K. N.C.
04-2019
N N
1 FURNITURE BY OTHERS
J125
CORRIDOR
180 SQ.FT
J106a
OBSERVATION
327 SQ.FT
J106
CONSULTATION LAB
1237 SQ.FT
A C R
HARD SURFACE -
VINYL FLOORING
SOFT SURFACE -
CARPET FLOORING
TR
AN
SIT
IO
N
ST
RIP
F1
F1
F2
F1 F2
TRANSITION
STRIP
SOFT SURFACE -
CARPET FLOORING
FLOORING SCHEDULE
SIZE: 9.85" X 39.4"
F1
CARPET FLOORING 1
MILLIKEN - FLOOR COVERING
COLOUR: DRY DOCK COL 126-5
SIZE: 9.85" X 39.4"
CARPET FLOORING 2
MILLIKEN - FLOOR COVERING
COLOUR: FELT GREY COL 5
SIZE: 9.85" X 39.4"
CARPET FLOORING 3
MILLIKEN - FLOOR COVERING
COLOUR: OCEAN MIST COL 126
WALL BASE: JOHNSONITE - TRADITION 20
CHARCOAL WG
PROFILE/ HEIGHT: HIGH COVE/ 4"
SIZE: 9.85" X 39.4"
F2
VINYL FLOORING 4
MILLIKEN - PIKE IN CLOUD
COLOUR: PIK144 VERTICAL ASHLAR
PROPOSED FLOOR PLAN
1
A8
PROPOSED FLOORS PLAN
3/16" = 1'-0"
NOTES:
Davis Campus
7899 McLauglin Road
Brampton, ON
(905) 459-7533
AS NOTED
A8
-
· Dispose of all material and debris within scope of
work offsite
· Make good of all areas affected by work to Sheridan
Standards.
· Coordinate all required testing and inspections
· Protect furniture, equipment and items to remain (ie.
flooring) during construction.
· Electrical Contractor shall verify capacity and location
of electrical panel required to complete scope of
work.
· Data Contractor shall verify capacity and location of
wiring closet required to complete scope of work.
· Refer to tender, specifications, instructions and all
other documents related to scope of work to complete
project.
Project Specific:
Drawn By:
Drawing No.:
Checked By:
· Drawings are meant to be read, and not scaled
· Dimensions to be verified on site
· Contractors must check and verify all dimensions and
report discrepancies to the Project Coordinator before
commencing with work
· All drawings remain the property of Sheridan College
and shall not be reproduced or reused without written
consent.
Construction North True North
General Notes:
Issues/RevisionsNo.
Project Name:
Seal:
Sheet Name:
Consultant(s):
Date
Issued Date:
Revision: Scale:
J106
CHILD & YOUTH CARE LAB
1
ISSUED FOR TENDER 05/19
S.K. N.C.
04-2019
N N
1
SUPPLY AND INSTALL FLOORING, TRANSITION STRIP(S) AND
WALL BASE AS PER SPECIFICATIONS AND DRAWING.
ELEVATIONS
1
A9
J106 NORTH ELEVATION
1/4" = 1'-0"
Davis Campus
7899 McLauglin Road
Brampton, ON
(905) 459-7533
AS NOTED
A9
-
· Dispose of all material and debris within scope of
work offsite
· Make good of all areas affected by work to Sheridan
Standards.
· Coordinate all required testing and inspections
· Protect furniture, equipment and items to remain (ie.
flooring) during construction.
· Electrical Contractor shall verify capacity and location
of electrical panel required to complete scope of
work.
· Data Contractor shall verify capacity and location of
wiring closet required to complete scope of work.
· Refer to tender, specifications, instructions and all
other documents related to scope of work to complete
project.
Project Specific:
Drawn By:
Drawing No.:
Checked By:
· Drawings are meant to be read, and not scaled
· Dimensions to be verified on site
· Contractors must check and verify all dimensions and
report discrepancies to the Project Coordinator before
commencing with work
· All drawings remain the property of Sheridan College
and shall not be reproduced or reused without written
consent.
Construction North True North
General Notes:
Issues/RevisionsNo.
Project Name:
Seal:
Sheet Name:
Consultant(s):
Date
Issued Date:
Revision: Scale:
J106
CHILD & YOUTH CARE LAB
1
ISSUED FOR TENDER 05/19
S.K. N.C.
04-2019
N N
2
A9
J106 EAST ELEVATION
1/4" = 1'-0"
3
A9
J106 SOUTH ELEVATION
1/4" = 1'-0"
ELEVATIONS
1
A10
J106A NORTH ELEVATION
1/4" = 1'-0"
Davis Campus
7899 McLauglin Road
Brampton, ON
(905) 459-7533
AS NOTED
A10
-
· Dispose of all material and debris within scope of
work offsite
· Make good of all areas affected by work to Sheridan
Standards.
· Coordinate all required testing and inspections
· Protect furniture, equipment and items to remain (ie.
flooring) during construction.
· Electrical Contractor shall verify capacity and location
of electrical panel required to complete scope of
work.
· Data Contractor shall verify capacity and location of
wiring closet required to complete scope of work.
· Refer to tender, specifications, instructions and all
other documents related to scope of work to complete
project.
Project Specific:
Drawn By:
Drawing No.:
Checked By:
· Drawings are meant to be read, and not scaled
· Dimensions to be verified on site
· Contractors must check and verify all dimensions and
report discrepancies to the Project Coordinator before
commencing with work
· All drawings remain the property of Sheridan College
and shall not be reproduced or reused without written
consent.
Construction North True North
General Notes:
Issues/RevisionsNo.
Project Name:
Seal:
Sheet Name:
Consultant(s):
Date
Issued Date:
Revision: Scale:
J106
CHILD & YOUTH CARE LAB
1
ISSUED FOR TENDER 05/19
S.K. N.C.
04-2019
N N
4
A10
J106 WEST ELEVATION
1/4" = 1'-0"
5
A10
J106 WEST ELEVATION
1/4" = 1'-0"
2
A10
J106A EAST ELEVATION
1/4" = 1'-0"
3
A10
J106A SOUTH ELEVATION
1/4" = 1'-0"
LEGENDS:
SYMBOL
ELECTRICAL:
CEILING SUSPENDED LUMINAIRE
TYPE 'L1' AS SPECIFIED
DEFINITION
SPECIAL LUMINAIRE TYPE, REFER
TO LUMINAIRE SCHEDULE FOR
MORE DETAIL
TRACK MOUNTED LUMINAIRE, TYPE
AS SPECIFIED
POLE MOUNTED LUMINAIRE, TYPE
'H1' AS SPECIFIED
H1
SPECIFIED LUMINAIRE CONNECTED
TO EMERGENCY POWER SUPPLY
AND/OR NIGHT LIGHT CIRCUIT
ONE, TWO & THREE GANG SINGLE
POLE LIGHT SWITCHES (3-DENOTES
THREE WAY, LV-DENOTES LOW
VOLTAGE, H-DENOTES 347V)
DIMMER SWITCH (LV - DENOTES
0-10V DIMMING)
DALI WALL STATION (SUPPLIED BY
SHERIDAN) IN SINGLE GANG BOX C/W 3/4"
C IN WALL SPACE UP TO CEILING SPACE.
'KP-2D', 'KP-4D' OR 'KP-6D' DENOTES TWO,
FOUR OR SIX BUTTON VERSION C/W
MASTER ON/OFF & RAISE/LOWER.
DALI OCCUPANCY SENSOR (SUPPLIED
BY SHERIDAN). SHORT RANGE.
COOPER #: FLT-MTS6-DALI.
15A-1P, 120V, 5-15R CONFIGURATION
SINGLE RECEPTACLE WALL
MOUNTED
20A-1P, 120V, 5-20R CONFIGURATION
SINGLE RECEPTACLE WALL
MOUNTED
15A-1P, 120V, 5-15R CONFIGURATION
DUPLEX RECEPTACLE WALL
MOUNTED
20A-1P, 120V, 5-20R CONFIGURATION
DUPLEX RECEPTACLE WALL
MOUNTED
15A-1P, 120V, 15-15R
CONFIGURATION QUAD
RECEPTACLE WALL MOUNTED
OC1
S S
LV
S
T
S
3
D
DALI OCCUPANCY SENSOR (SUPPLIED
BY SHERIDAN). LONG RANGE.
COOPER #: FLT-MTS12-DALI.
KP-4
KP-2
D
S
S
H
GREENGATE SHORT RANGE OCCUPANCY
SENSOR (SUPPLIED BY SHERIDAN). .
COOPER #: OAC-DT-1000-R
DPP
Dali Power Pack, FLT-SP-347-DC1
OC2
OC3
L1
F1
CEILING SUSPENDED LUMINAIRE
TYPE 'F1' AS SPECIFIED
GREENGATE LONG RANGE OCCUPANCY
SENSOR (SUPPLIED BY SHERIDAN). .
COOPER #: OAC-DT-2000-ROC4
Dali Digital to Analog Converter,
FLT-DAC-DALI-DC1
DAC
DR
Dali Relay, FLT-HPRS-DALI
KP-6D
DUAL TECH LV OCCUPANCY SENSOR -
WALL MOUNT (GREENGATE)
OC5
SYMBOL
ELECTRICAL:
DEFINITIONSYMBOL
ELECTRICAL:
DEFINITION
15A -1P, 120V, 15-15R
CONFIGURATION DUPLEX
RECEPTACLE FLOOR MOUNTED
15A -1P, 120V, 15-15R
CONFIGURATION DUPLEX
RECEPTACLE CEILING MOUNTED
15A-1P, 120V, 15-15R
CONFIGURATION DUPLEX SPLIT
RECEPTACLE WALL MOUNTED
120V ELECTRICAL CONNECTION TO
EQUIPMENT AS NOTED
FB-X
FLOOR BOX TYPE X
POWER CORD REEL WITH CEILING
MOUNTED T-SLOT 20A-1P DUPLEX
OUTLET.
PCR
208V, 1Ø ELECTRICAL CONNECTION
TO EQUIPMENT AS NOTED
208V, 3Ø ELECTRICAL CONNECTION
TO EQUIPMENT AS NOTED
GREENGATE SHORT RANGE OCCUPANCY
SENSOR (SUPPLIED BY SHERIDAN). .
COOPER #: OAC-DT-1000-R
Dali Power Pack, FLT-SP-347-DC1
GREENGATE LONG RANGE OCCUPANCY
SENSOR (SUPPLIED BY SHERIDAN). .
COOPER #: OAC-DT-2000-R
Dali Digital to Analog Converter,
FLT-DAC-DALI-DC1
DR
Dali Relay, FLT-HPRS-DALI
DUAL TECH LV OCCUPANCY SENSOR -
WALL MOUNT (GREENGATE)
CEILING OR WALL MOUNTED 'EXIT'
LIGHT (SHADED QUADRANTS DENOTE
FACE DIRECTIONS) AND DIRECTIONAL
ARROWS AS INDICATED
COMMUNICATIONS (IT & SECURITY):
PROJECTOR C/W MOUNTING
APPARATUS
SYMBOL DEFINITION
ULTRA SHORT THROW PROJECTOR
C/W MOUNTING APPARATUS
EMERGENCY PHONE
ACCESS CARD READER (K -
DENOTES C/W KEYPAD)
WIRELESS ACCESS POINT
IP CLOCK
TELEPHONE
DATA OUTLET
FIRE AND LIFE SAFETY:
EXISTING FIRE SEPARATION TO
REMAIN
SYMBOL DEFINITION
0 HOUR FIRE SEPARATION
30 MINUTE (1/2 HR) FIRE
SEPARATION
45 MINUTE (3/4 HR) FIRE
SEPARATION
1 HOUR FIRE SEPARATION
1.5 HOUR SEPARATION
2 HOUR FIRE SEPARATION
0 0
1/2
3/4
1
1.5
2
1/2
3/4
1
1.5
2
LOCATION OF FIRE EXTINGUISHER
LOCATION OF FIRE HOSE CABINET
FIRE SPEAKER
FIRE SPEAKER W/ STROBE LIGHT
PULL STATION LOCATION
SPRINKLER HEAD LOCATION
HEAT DETECTOR
SMOKE DETECTOR
ACR - KACR
IP
TEL
#
FE
FHC
HD
SD
FLOOR MOUNTED DATA OUTLET
#
CEILING MOUNTED DATA OUTLET
#
SECURITY CAMERA
A/V SPEAKER
S
ZONE 1
ZONE 2
ZONE 3
ZONE 4
PROPOSED MECHANICAL/
ELECTRICAL CONTROLS
INSTALL THERMOSTAT AND ELECTRICAL CONTROLS SIDE BY
SIDE AT SAME A.F.F. ELEVATION BY THE DOOR. EXACT
LOCATIONS TBD. TO BE COORDINATED WITH MECHANICAL
AND ELECTRICAL.
40.5"
ZONE 1
ZONE 2
ZONE 3
ZONE 4
40.5"
O/C A.F.F. +/-O/C A.F.F. +/-
2'X2' RECESSED LED TROFFER LIGHT FIXTURE, 41W, 3024LM, 4000K, 347V,
COOPER METALUX ENCOUNTER PART #:
TYPE DESCRIPTION
LAMP DATA
MANUFACTURER / SEE NOTEMOUNTING
VOLTAGE
LUMINAIRE SCHEDULE
TYPE WATTS
T-BAR
RECESSED
35
F2
2'X2' RECESSED LED TROFFER LIGHT FIXTURE, 41W, 3024LM, 4000K, 347V,
DIMMING (10%-100%), DALI DRIVER, AND WHITE FINISH.
(ALL DALI LOOPS TO BE PROVIDED BY ELECTRICAL CONTRACTOR.)
COOPER METALUX ENCOUNTER PART #:
22EN-LD1-34-347-L840-5LTD-1-U
(SUPPLIED BY SHERIDAN COLLEGE)
347
LED
4000K
3466LM
TYPE S IP CLOCK REQUIREMENTS
MIN. 1" (25 mm) CONDUIT
ANGLED TOWARD MAIN
RUN (BY DIVISION 16).
DECIRA STYLE ADAPTER
BLANK
CAT6 MODULAR OUTLET
BLANK
SINGLE GANG BOX
COVERPLATE (BY DIV. 16)
TYPE S
TYPE S - WALL MOUNT CLOCK LOCATION
ONE (1) CATEGORY 6 DATA DROP
(BY COMMS) MOUNTED AT 12"
ABOVE ENTRANCE DOOR FRAME
TYPE S
1'-0"
5
7
8
"3
7
8
"
RECESSED AREA
BEHIND CLOCK
DESIGNATED
FOR DATA
CENTERED OVER DOOR FRAME
DENOTES DEVICE TO BE MOUNTED
COUNTER HEIGHT
CH
DENOTES TWISTLOCKTL
ABBREVIATIONS:
EXISTING TO REMAINE
DENOTES EXISTING ITEM TO BE
RELOCATED
R
DENOTES EXISTING ITEM TO BE REMOVEDD
DENOTES WEATHERPROOFWP
DENOTES EXISTING ITEM IN RELOCATED
POSITION.
RP
DEFINITION
GROUND FAULT INTERRUPTERGFI
SYMBOL
DENOTED PROPOSED ITEM TO BE ADDED.P
C IN WALL SPACE UP TO CEILING SPACE.
'KP-2D', 'KP-4D' OR 'KP-6D' DENOTES TWO,
GREENGATE SHORT RANGE OCCUPANCY
GREENGATE LONG RANGE OCCUPANCY
WALL MOUNTED EMERGENCY
LIGHTING BATTERY UNIT BU-1, C/W
DUPLEX OUTLET
RECESSED CEILING MOUNTED
EMERGENCY LIGHTING REMOTE
HEAD
SINGLE OR DOUBLE SURFACE
MOUNTED EMERGENCY LIGHTING
REMOTE HEADS
347V OR 600V ELECTRICAL
CONNECTION TO EQUIPMENT AS
NOTED
ELECTRICAL PANEL
CONTACTOR
HAND DRYER
DISCONNECT SWITCH - UNFUSED
DISCONNECT SWITCH - FUSED
WALL MOUNTED JUNCTION BOX FOR
POWER CONNECTION TO MODULAR
FURNITURE (F-DENOTES FLOOR,
C-DENOTES CEILING)
WALL MOUNTED JUNCTION BOX FOR
COMMUNICATION CABLING FOR
MODULAR FURNITURE (F-DENOTES
FLOOR, C-DENOTES CEILING)
EXISTING HARDWIRED ANALOG
CLOCK
BU - 1
J
C
HD
P
C
PAC POLE (SINGLE CHANNEL)
PAC POLE (SPLIT MULTI-CHANNEL)
JUNCTION BOX
AUTOMATIC DOORAD
SYMBOL DEFINITION
GREENGATE SHORT RANGE OCCUPANCY
GREENGATE LONG RANGE OCCUPANCY
DENOTES ISOLATED GROUND RECEPTACLEIG
ELECTRICAL NOTES &
SPECIFICATIONS
Davis Campus
7899 McLauglin Road
Brampton, ON
(905) 459-7533
AS NOTED
E1
-
· Dispose of all material and debris within scope of
work offsite
· Make good of all areas affected by work to Sheridan
Standards.
· Coordinate all required testing and inspections
· Protect furniture, equipment and items to remain (ie.
flooring) during construction.
· Electrical Contractor shall verify capacity and location
of electrical panel required to complete scope of
work.
· Data Contractor shall verify capacity and location of
wiring closet required to complete scope of work.
· Refer to tender, specifications, instructions and all
other documents related to scope of work to complete
project.
Project Specific:
Drawn By:
Drawing No.:
Checked By:
· Drawings are meant to be read, and not scaled
· Dimensions to be verified on site
· Contractors must check and verify all dimensions and
report discrepancies to the Project Coordinator before
commencing with work
· All drawings remain the property of Sheridan College
and shall not be reproduced or reused without written
consent.
Construction North True North
General Notes:
Issues/RevisionsNo.
Project Name:
Seal:
Sheet Name:
Consultant(s):
Date
Issued Date:
Revision: Scale:
J106
CHILD & YOUTH CARE LAB
1
ISSUED FOR TENDER 05/19
S.K. N.C.
04-2019
N N
ELECTRICAL NOTES
INSTALLATION REQUIREMENTS
1. ALL EQUIPMENT MATERIAL, DEVICES AND WIRING SHALL CONFORM TO THE
CANADIAN ELECTRICAL CODE OR CODE HAVE JURISDICTION FOR THE
PURPOSE FOR WHICH THEY ARE TO BE USED AND SHALL BEAR THE
APPROVAL OF THE CSA AND/OR ULC OR HAVE SPECIAL APPROVAL OF THE
INSPECTION AUTHORITY.
2. ALL MATERIAL AND EQUIPMENT SHALL BE NEW. WHERE MANUFACTURER IS
NOT SPECIFIED, MATERIAL AND EQUIPMENT SHALL BE OF HIGH
COMMERCIAL QUALITY AND CONSISTENT WITH BASE BUILDING STANDARDS.
3. VERIFY ON SITE EXISTING CIRCUITS USED, SPARE BREAKERS AND SPACES
AVAILABLE IN EXISTING PANEL BOARDS.
4. ALL CONDUIT SHALL BE MINIMUM OF
3
4
" (21mm) UNLESS OTHERWISE NOTED.
NO SECTION OF CONDUIT SHALL BE LONGER THAN 30 METERS (100 FEET) OR
CONTAIN MORE THAN TWO 90-DEGREE BENDS BETWEEN PULL BOXES.
5. AC90 (BX) ARMORED CABLE CAN BE USED IN EXISTING WALL PARTITIONS.
CONDUIT SHALL BE USED AT ALL NEW WALL PARTITIONS AND EXPOSED
CEILING SPACE. DO NOT RUN ARMORED CABLE IN EXPOSED AREAS OR INTO
PANEL BOARDS.
6. ALL WIRING SHALL BE COPPER, TYPE RW-90 XLPE INSULATION. MINIMUM
WIRE SIZE FOR 120V BRANCH WIRING SHALL BE NO.12 AWG COPPER. IF
DISTANCE BETWEEN ELECTRICAL PANEL AND FIRST OUTLET EXCEEDS 80
FEET, A NO. 10 AWG COPPER SHALL BE USED (UP TO 120 FEET). VOLTAGE
DROP IN ANY CIRCUIT SHALL NOT EXCEED 3%.
7. PROVIDE A DEDICATED NEUTRAL AND GROUND WIRE OF THE SAME AWG AS
THE CIRCUIT CONDUCTOR FOR ALL CIRCUITS IDENTIFIED ON THE
DRAWINGS.
8. IN SYSTEM FURNITURE CONNECTION, A MINIMUM OF #10 AWG MUST BE
USED FOR THE NEUTRAL FROM THE ELECTRICAL PANEL TO THE CLOSEST
JUNCTION BOX TO THE CIRCUIT TERMINATION.
9. GROUNDING OF CONDUIT SYSTEMS: ALL CONDUIT SYSTEMS ARE TO BE
INDEPENDENTLY GROUNDED WITH THE USE OF A DEDICATED GROUND
WIRE. CONDUIT IS NOT TO BE USED AS GROUNDING OR BONDING METHODS.
10. CONVENIENCE AND DEDICATED CIRCUIT DUPLEX RECEPTACLES SHALL BE
LEVITON, DECORA SERIES OR APPROVED EQUAL.
11. 347 V LIGHT SWITCHES SHALL BE LEVITON, DECORA SERIES OR APPROVED
EQUAL.
12. ALL LIGHTING FIXTURES SHALL BE AS SPECIFIED, COMPLETE WITH LAMPS
AND ACCESSORIES.
13. ALL EXISTING RELOCATED AND NEW FLUORESCENT LUMINAIRES SHALL BE
INDEPENDENTLY SUPPORTED FROM CEILING STRUCTURE.
14. ALL BASE BUILDING FIXTURES ON EMERGENCY POWER SHALL BE
HARDWIRED.
15. OUTLETS SHALL NOT BE INSTALLED BACK TO BACK IN PARTITIONS.
STAGGER TO PREVENT SOUND TRANSFER.
16. ALL SURFACE MOUNTED POWER & COMM RECEPTACLES TO BE PROVIDED
WITH CAST ALUMINIUM FS OR FD TYPE OUTLET BOXES. (HUBBELL KILLARK
FS/FD SERIES OR APPROVED EQUIVALENT).
GENERAL REQUIREMENTS
1. COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF ALL
APPLICABLE CODES, THE REQUIREMENTS OF FEDERAL, PROVINCIAL AND
MUNICIPAL CODES, LOCAL BY-LAWS, THE APPLICABLE STANDARDS OF THE
UNDERWRITERS' ASSOCIATION AND ALL AUTHORITIES HAVING
JURISDICTION. ALSO, COMPLY WITH THE STANDARDS FOR THE BUILDING(S)
IN WHICH THE WORK IS TO TAKE PLACE.
2. THE ARCHITECTURAL DRAWINGS AND SPECIFICATIONS SHALL BE READ IN
CONJUNCTION WITH THE ELECTRICAL DRAWINGS AND SPECIFICATIONS.
3. ARRANGE FOR INSPECTION OF ALL WORK BY THE AUTHORITIES HAVING
JURISDICTION OVER THE WORK. ON COMPLETION OF THE PROJECT,
PRESENT TO SHERIDAN THE FINAL UNCONDITIONAL CERTIFICATE OF
APPROVAL FROM THE INSPECTION AUTHORITIES.
4. DRAWINGS ARE DIAGRAMMATIC AND INTENDED TO SHOW THE SCOPE OF
THE WORK, GENERAL ARRANGEMENT AND LOCATION OF THE EQUIPMENT
AND OUTLETS. THEY ARE NOT INTENDED TO SHOW THE DETAILS OF THE
INSTALLATION. VERIFY EXACT LOCATION AND MOUNTING HEIGHT OF ALL
WIRING DEVICES.
5. ALL LUMINARIES, EQUIPMENT AND MATERIALS SHALL BE C.S.A. APPROVED.
6. PROVIDE FIREPROOF SEALS IN ACCORDANCE WITH THE LOCAL CODES AND
STANDARDS AND THE ONTARIO BUILDING CODE.
7. PROVIDE ALL ELECTRICAL WIRING TO FURNITURE SYSTEMS. CONNECTION
BY OTHERS.
8. SUPPLY AND INSTALL ALL CONDUIT FOR DATA. SUPPLY AND INSTALLATION
OF DATA CABLING BY OTHERS.
9. CONTRACTOR TO COMPLETE ALL LOAD CALCULATIONS & TO COMPLETE
WORK ACCORDING TO ESA STANDARDS AND APPLICABLE CODES
DEMOLITION AND WORK IN EXISTING BUILDING
1. DISCONNECT AND REMOVE ALL ELECTRICAL EQUIPMENT INCLUDING
LUMINARIES, RECEPTACLES AND WIRING FROM AREAS BEING ALTERED OR
DEMOLISHED. WIRING, CONDUIT AND EQUIPMENT REQUIRED TO MAINTAIN
SERVICES IN OTHER PARTS OF THE BUILDINGS SHALL BE TEMPORARILY
SUPPORTED, REROUTED, SERVICED OR RELOCATED AS REQUIRED.
OBSOLETE CONDUITS AND CABLES SHALL BE DISCONNECTED FROM THEIR
SOURCE OF SUPPLY AND REMOVED. ALL EXISTING WIRING NOT REMOVED
SHALL BE DISCONNECTED, MADE SAFE, IDENTIFIED AND BLANKED-OFF.
2. COORDINATE REQUIRED SHUTDOWNS OF EXISTING BASE BUILDING
SYSTEMS WITH SHERIDAN. EXISTING BUILDING MUST BE KEPT IN
OPERATION AT ALL TIMES. ASSUME FULL RESPONSIBILITY FOR DISRUPTION
TO EXISTING SERVICES.
3. NEW CONDUITS AND OTHER NEW SERVICES SHALL BE CAREFULLY ROUTED
SO THAT THEY DO NOT INTERFERE WITH ANY EXISTING INSTALLATIONS.
4. COORDINATE WITH SHERIDAN ALL CONDUITS RUNNING IN OTHER TENANT
AREAS.
J125
CORRIDOR
180 SQ.FT
A C R
J106a
OBSERVATION
327 SQ.FT
J106
CONSULTATION LAB
1237 SQ.FT
S
S
S S
S
S
S
Davis Campus
7899 McLauglin Road
Brampton, ON
(905) 459-7533
AS NOTED
E2
-
· Dispose of all material and debris within scope of
work offsite
· Make good of all areas affected by work to Sheridan
Standards.
· Coordinate all required testing and inspections
· Protect furniture, equipment and items to remain (ie.
flooring) during construction.
· Electrical Contractor shall verify capacity and location
of electrical panel required to complete scope of
work.
· Data Contractor shall verify capacity and location of
wiring closet required to complete scope of work.
· Refer to tender, specifications, instructions and all
other documents related to scope of work to complete
project.
Project Specific:
Drawn By:
Drawing No.:
Checked By:
· Drawings are meant to be read, and not scaled
· Dimensions to be verified on site
· Contractors must check and verify all dimensions and
report discrepancies to the Project Coordinator before
commencing with work
· All drawings remain the property of Sheridan College
and shall not be reproduced or reused without written
consent.
Construction North True North
General Notes:
Issues/RevisionsNo.
Project Name:
Seal:
Sheet Name:
Consultant(s):
Date
Issued Date:
Revision: Scale:
J106
CHILD & YOUTH CARE LAB
1
ISSUED FOR TENDER 05/19
S.K. N.C.
04-2019
N N
POWER & DATA -
DEMOLITION PLAN
1
E2
POWER & DATA - DEMOLITION PLAN
3/16" = 1'-0"
NOTES:
11
1
1 1
1
1
REMOVE AND PROTECT EXISTING SPEAKERS AND FIRE
SPEAKERS, RE-INSTALL ONCE THE NEW CEILING TILES ARE
INSTALLED. REFER TO PROPOSED CEILING PLAN.
2
2
2 REUSE EXISTING WIRELESS ACCESS POINTS.
1
1
J125
CORRIDOR
180 SQ.FT
J106a
OBSERVATION
327 SQ.FT
J106
CONSULTATION LAB
1237 SQ.FT
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
Davis Campus
7899 McLauglin Road
Brampton, ON
(905) 459-7533
AS NOTED
E3
-
· Dispose of all material and debris within scope of
work offsite
· Make good of all areas affected by work to Sheridan
Standards.
· Coordinate all required testing and inspections
· Protect furniture, equipment and items to remain (ie.
flooring) during construction.
· Electrical Contractor shall verify capacity and location
of electrical panel required to complete scope of
work.
· Data Contractor shall verify capacity and location of
wiring closet required to complete scope of work.
· Refer to tender, specifications, instructions and all
other documents related to scope of work to complete
project.
Project Specific:
Drawn By:
Drawing No.:
Checked By:
· Drawings are meant to be read, and not scaled
· Dimensions to be verified on site
· Contractors must check and verify all dimensions and
report discrepancies to the Project Coordinator before
commencing with work
· All drawings remain the property of Sheridan College
and shall not be reproduced or reused without written
consent.
Construction North True North
General Notes:
Issues/RevisionsNo.
Project Name:
Seal:
Sheet Name:
Consultant(s):
Date
Issued Date:
Revision: Scale:
J106
CHILD & YOUTH CARE LAB
1
ISSUED FOR TENDER 05/19
S.K. N.C.
04-2019
N N
LIGHTING -
DEMOLITION PLAN
1
E3
LIGHTING - DEMOLITION PLAN
3/16" = 1'-0"
NOTES:
1
2
DISCONNECT AND DISPOSE OFF SITE ALL EXISTING LIGHT
FIXTURES INCLUDING ALL ASSOCIATED CONDUIT, WIRING,
LIGHT SWITCHES AND ALL ASSOCIATED LIGHTING CONTROLS.
ALL MATERIALS TO BE DISPOSED OFF SITE ACCORDING TO
CURRENT ENVIRONMENTAL PRACTICES. PROVIDE DISPOSAL
CERTIFICATE FOR ALL REMOVED AMPS. ASSIST WITH
SHERIDAN SUSTAINABILITY REPRESENTATIVE AS REQUIRED
FOR COMPLETION OF OAKVILLE HYDRO INCENTIVE
APPLICATION.
J125
CORRIDOR
180 SQ.FT
J106a
OBSERVATION
327 SQ.FT
J106
CONSULTATION LAB
1237 SQ.FT
A C R
EXISTING
VERTICAL
TACK BOARD
EXISTING
VERTICAL
TACK BOARD
48 - STRIVE STACKING CHAIRS WITH CASTERS
24 - MOBILE FLIP TABLES WITH CASTERS
8 - STORAGE UNITS
2 - VERTICAL EXISTING TACK BOARDS
A C R
EXISTING
TACK BOARD
TABLE STORAGE AREA
CHAIR
STORAGE
AREA
MICROWAVE
CAPGCCAPDHCAPQTCAPMCCAPMGCAPPN
CHAIR
STORAGE
AREA
CAPGCCAPDHCAPQTCAPMCCAPMGCAPPN
AD AD
AD
AD
PP21 - CCT1
PP21 - CCT1
FOR MICROWAVE
PP21 - CCT2
Davis Campus
7899 McLauglin Road
Brampton, ON
(905) 459-7533
AS NOTED
E4
-
· Dispose of all material and debris within scope of
work offsite
· Make good of all areas affected by work to Sheridan
Standards.
· Coordinate all required testing and inspections
· Protect furniture, equipment and items to remain (ie.
flooring) during construction.
· Electrical Contractor shall verify capacity and location
of electrical panel required to complete scope of
work.
· Data Contractor shall verify capacity and location of
wiring closet required to complete scope of work.
· Refer to tender, specifications, instructions and all
other documents related to scope of work to complete
project.
Project Specific:
Drawn By:
Drawing No.:
Checked By:
· Drawings are meant to be read, and not scaled
· Dimensions to be verified on site
· Contractors must check and verify all dimensions and
report discrepancies to the Project Coordinator before
commencing with work
· All drawings remain the property of Sheridan College
and shall not be reproduced or reused without written
consent.
Construction North True North
General Notes:
Issues/RevisionsNo.
Project Name:
Seal:
Sheet Name:
Consultant(s):
Date
Issued Date:
Revision: Scale:
J106
CHILD & YOUTH CARE LAB
1
ISSUED FOR TENDER 05/19
S.K. N.C.
04-2019
N N
POWER & DATA -
PROPOSED PLAN
1
E4
POWER & DATA - PROPOSED PLAN
3/16" = 1'-0"
NOTES:
9
9
SUPPLY AND INSTALL A SHERIDAN APPROVED AUTOMATIC
DOOR OPENER, CONFIRM DOOR OPERATOR DETAILS WITH
PRE-QUALIFIED DOOR HARDWARE AND ACCESS CONTROL
VENDOR.
1 NOTE:
A. WIRING CLOSET TO BE USED: J109/107
B. LABELING CONVENTION USED: WIRING CLOSET # - LOCATION
ON THE PATCH PANEL (FOR EXAMPLE: C135-115-47)
C. PRIOR TO ANY I.T. RELATED WORK, GC AND/OR DATA
VENDOR SHALL CONTACT:
MARTIN NOWAKOWSKI 416-577-4969
DARKO RADMAN 647-234-4196
2 PROVIDE WARRANTY CERTIFICATE UPON PROJECT COMPLETION
TO SHERIDAN'S P.M.
3 PROVIDE ELECTRONIC COPY OF BOTH SUMMARY AND TEST
RESULTS (FOR ALL JOBS) TO SHERIDAN'S P.M.
4 PROVIDE ELECTRONIC COPY OF AS-BUILT O SHERIDAN'S P.M. IN
BOTH AUTOCAD AND PDF FORMAT.
5 FOR ADDITIONAL INFORMATION REFER TO THE "COMMUNICATIONS
INFRASTRUCTURE DESIGN GUIDE V.5 (SEPT. 2013)
6 SUPPLY AND INSTALL ALL DATA CABLING AS SPECIFIED. LABEL ALL
POWER AND DATA OUTLETS. FOR LOCATION AND LABELING
CONVENTION COORDINATE WITH SHERIDAN COLLEGE ELECTRICAL
ENGINEER AND IT GUIDELINES. DATA IS TO BE FED FROM WIRING
CLOSET ****. 1' PATCH CABLES AT CLOSET ONLY BLUE JACK
TERMINATION.
7 ELECTRICAL CONTRACTOR TO REVIEW ACTUAL SITE CONDITIONS
AND ADJUST CIRCUIT NUMBERS AS REQUIRED. ELECTRICAL
CONTRACTOR TO PROVIDE RED LINE MARK-UPS AND UPDATED
PANEL SCHEDULES AT THE END OF THE PROJECT.
8 COORDINATE ALL NEW POWER AND DATA LOCATIONS WITH
SHERIDAN PC PRIOR TO INSTALLATION.
10
RELOCATE ANY ELECTRICAL AS REQUIRED TO SUIT CEILING
REMOVAL AND INSTALLATION OF NEW CEILING. PROVIDE
TEMPORARY LIGHTING AS REQUIRED.
10
10
9
11
12
12
SUPPLY AND INSTALL NEW ACCESS CARD READER , SPEC
WILL BE PROVIDED BY PRE-QUALIFIED VENDOR.
EXTEND PROJECTOR CIRCUIT FOR NEW PROJECTOR OUTLET
IN CEILING SPACE.
11
J125
CORRIDOR
180 SQ.FT
J106a
OBSERVATION
327 SQ.FT
J106
CONSULTATION LAB
1237 SQ.FT
A C R
EXISTING
VERTICAL
TACK BOARD
EXISTING
VERTICAL
TACK BOARD
48 - STRIVE STACKING CHAIRS WITH CASTERS
24 - MOBILE FLIP TABLES WITH CASTERS
8 - STORAGE UNITS
2 - VERTICAL EXISTING TACK BOARDS
EXISTING
TACK BOARD
TABLE STORAGE AREA
CHAIR
STORAGE
AREA
9'-8"
9'-8"
9'-8"
9'-8"
9'-8"
S
S
S
S
S
S
MICROWAVE
CAPGCCAPDHCAPQTCAPMCCAPMGCAPPN
CHAIR
STORAGE
AREA
CAPGCCAPDHCAPQTCAPMCCAPMGCAPPN
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
F2
KP-4
KP
-4
J
KP-2
EMG
OC2
OC2
OC2
DPP
OC4
OC4
KP-2
Davis Campus
7899 McLauglin Road
Brampton, ON
(905) 459-7533
AS NOTED
E5
-
· Dispose of all material and debris within scope of
work offsite
· Make good of all areas affected by work to Sheridan
Standards.
· Coordinate all required testing and inspections
· Protect furniture, equipment and items to remain (ie.
flooring) during construction.
· Electrical Contractor shall verify capacity and location
of electrical panel required to complete scope of
work.
· Data Contractor shall verify capacity and location of
wiring closet required to complete scope of work.
· Refer to tender, specifications, instructions and all
other documents related to scope of work to complete
project.
Project Specific:
Drawn By:
Drawing No.:
Checked By:
· Drawings are meant to be read, and not scaled
· Dimensions to be verified on site
· Contractors must check and verify all dimensions and
report discrepancies to the Project Coordinator before
commencing with work
· All drawings remain the property of Sheridan College
and shall not be reproduced or reused without written
consent.
Construction North True North
General Notes:
Issues/RevisionsNo.
Project Name:
Seal:
Sheet Name:
Consultant(s):
Date
Issued Date:
Revision: Scale:
J106
CHILD & YOUTH CARE LAB
1
ISSUED FOR TENDER 05/19
S.K. N.C.
04-2019
N N
LIGHTING -
PROPOSED PLAN
1
E5
LIGHTING - PROPOSED PLAN
3/16" = 1'-0"
NOTES:
LIGHT FIXTURES, DALI OCCUPANCY SENSORS, DALI WALL SWITCHES TO BE SUPPLIED BY SHERIDAN
COLLEGE. CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL CONDUIT, WIRING AND MISC. MATERIAL
FOR A FULLY COMPLETE AND OPERATIONAL LIGHTING SYSTEM. ALL LIGHTING AND CONTROLS TO BE
INSTALLED TO SUIT MANUFACTURER'S RECOMMENDATIONS. REFER TO DALI LIGHTING CONTROL LAYOUT
DETAILS. FINAL DALI COMMISSIONING BY SHERIDAN COLLEGE/ COOPER LIGHTING. CONTRACTOR TO
COORDINATE AND ASSIST WITH COMMISSIONING OF DALI DEVICES AS REQUIRED.
PRIOR TO FINAL COMMISSIONING BY COOPER LIGHTING/ SHERIDAN COLLEGE, CONTRACTOR TO VERIFY
DALI WIRING BY FOLLOWING STEPS OUTLINED IN 'ELECTRICAL CONTRACTOR TESTING PROTOCOL
PRODUCTION CHECKLIST" DOCUMENT. CONTRACTOR MUST VERIFY VOLTAGE(S) OF DALI LOOP(S) TO
ENSURE IT IS LOW VOLTAGE (24V) PRIOR TO LANDING WIRES ON SHERIDAN LCP TERMINAL STRIPS.
NO MARRETS ALLOWED FOR ANY LIGHTING CONTROLS (DALI ON 0-10V) WIRING TERMINATIONS. USE
ONLY PUSH-IN WIRE CONNECTIONS (WAGO 221 SERIES) WITH CABLE RELEASE LEVERS AND RATED FOR
600V. ALL DALI WIRING TO BE PURPLE JACKETED AND ALL 0-10V WIRING TO BE GREY JACKETED
NEW LIGHT FIXTURE TO BE POWERED FROM EXISTING 347V NORMAL
POWERED LIGHTING CIRCUIT IN THE AREA. TYPICAL FOR AREA OR
FLOOR.
NEW LIGHT FIXTURE TO BE POWERED FROM EXISTING 347V
EMERGENCY LIGHTING CIRCUIT IN THE AREA. TYPICAL FOR AREA OR
FLOOR.
CEILING MOUNTED OCCUPANCY SENSOR. EXACT LOCATION OR
MOUNTING HEIGHT TO BE INSTALLED TO SUIT SITE CONDITIONS TO
ENSURE PROPER COVERAGE FOR ROOM AND TO SUIT
MANUFACTURER'S RECOMMENDATIONS. STEM MOUNT TO AVOID
CEILING INTERFERENCES AND COORDINATE LOCATIONS WITH
SHERIDAN PROJECT COORDINATOR. TYPICAL.
DALI LOOP WIRING (MIN2#16 AWG PURPLE WIRES C/W 600V INSULATION
RATING OR BELDEN 62004E.007.1000 PLENUM RATED CABLING C/W
VIOLET JACKET). REFER TO DALI LIGHTING CONTROL LAYOUT DETAILS
ON DRAWING E5. THE SHOWN DALI WIRING INTERCONNECTIONS ARE
ONLY DIAGRAMATIC. ORDER OF CONNECTIONS IN DRAWING IS
FLEXIBLE. HOME RUN DALI LOOP TO BE PROVIDED BACK TO LIGHTING
CONTROL PANEL (LCP) AS INDICATED. MECHANICALLY PROTECT DALI
WIRING IN CONDUIT (MINIMUM 3/4"C) WHEN ROUTED IN EXPOSED
CEILINGS OR NOT IN CABLE TRAY. ROUTING OF DALI PLENUM RATED
CABLES IN EXISTING CABLE TRAYS MUST BE REVIEWED/APPROVED
WITH SHERIDAN PROJECT COORDINATOR.
DALI WALL STATION IN RECESSED IN SINGLE GANG OUTLET BOX C/W
STAINLESS STEEL COVER PLATE. GANG MULTIPLE WALL STATIONS
WHERE MULTIPLE WALL STATIONS USED. TYPICAL.
EXTEND DALI LOOP WIRING (IN 3/4" CONDUIT) BACK TO EXISTING
SHERIDAN COLLEGE LIGHTING CONTROL PANEL BREAKOUT BOX
LOCATED IN IT CLOSET J107.
DALI POWER PACK. PROVIDE LOW VOLTAGE CONNECTION TO
GREENGATE SENSORS TO SUIT MANUFACTURER'S RECOMMENDATION.
PROVIDE #16/5 AWG LOW VOLTAGE WIRING BETWEEN DALI POWER
PACK AND SENSOR WIRED IN PARALLEL. [RED - RED (15VDC), BLUE -
BLUE (CONTROL), BLACK (COMMON), YELLOW - YELLOW (OCC), WHITE -
BROWN (COMMISSIONING).]
2
3
4
6
7
8
1
5
8
6
4
5
2
3
7
NOTES
1. FOR A TYPICAL LIGHTING CIRCUIT FEEDING A
COMBINATION OF DALI DIMMABLE BALLASTS, FIELD
RELAYS DACS AND DIMMING MODULES, MAKE SURE TO
SPLIT UP THE CIRCUIT INTO DIFFERENT BRANCHES FOR
EACH FIELD RELAY AND DAC MODULES.
2. EACH FIFTH LIGHT LIGHTING CONTROL PANEL (LCP )
REQUIRES A DEDICATED 120VAC, 20A POWER FEED FROM
THE NORMAL-POWER ELECTRICAL PANEL. LOCATION OF
EACH LCP MUST BE CONFIRMED AND VERIFIED ONSITE.
3. EACH CAT6 RUN MUST NOT EXCEED A DISTANCE OF 100
METERS.
4. FOR DALI BUS TERMINATION OF BALLASTS, LED
MODULES, DAC MODULES, FIELD RELAYS, DIMMING
MODULES AND SENSORS , REFER TO THE "LIGHTING
CONTROL PANEL SCHEDULES" PROVIDED BY FIFTH LIGHT.
5. LINE VOLTAGE GROUND WIRE TO BE RUN
INDEPENDENTLY AS PER ELECTRICAL SPECIFICATIONS.
Power
Pack
FIFTH LIGHT DALI FIELD RELAY
FIELD
RELAY
LINE IN/BLACK
LINE OUT/BLACK
GROUND (EARTH GROUND)
LINE VOLTAGE
NEUTRAL
DALI BUS WIRE
DALI BUS WIRE
LIGHTING LOAD
LIGHTING LOAD
6
1. EACH DALI BUS REQUIRES TWO (2) #16 AWG WIRES MINIMUM. EACH PAIR OF DALI WIRES
CAN BE RUN IN FREE AIR OR IN THE SAME POWER CONDUIT AS THE LIGHTING BRANCH
CIRCUIT CONDUCTORS IF THE WIRES ARE INSULATED FOR AT LEAST THE SAME VOLTAGE
AS THAT OF THE CIRCUIT HAVING THE HIGHEST VOLTAGE. CONTRACTOR IS RESPONSIBLE
TO ENSURE INSTALLATION MEETS ALL LOCAL ELECTRICAL CODES.
2. EACH DALI BUS MUST NOT EXCEED A MAXIMUM DISTANCE OF 300 METERS BETWEEN THE
FURTHEST DALI DEVICE AND THE DESIGNATED LIGHTING CONTROL PANEL (LCP).
3. EACH DALI BUS CAN HAVE A MAXIMUM OF SIXTY FOUR (64) DALI DEVICES, WHICH CAN BE
CONNECTED IN PARALLEL BUS CONFIGURATION. CONTRACTOR TO FOLLOW DALI BUS
DESIGN PROVIDED ON THE LIGHTING PLAN(S).
4. CONTRACTOR TO TERMINATE ALL DALI BUS WIRES AT A DESIGNATED LCP ACCORDING TO
THE "LCP SCHEDULE(S)" PROVIDED .
5. FOR A LIGHTING CIRCUIT FEEDING A COMBINATION OF DALI BALLASTS, FIELD RELAYS,
DAC AND DIMMING MODULES, MAKE SURE TO SPLIT UP THE CIRCUIT INTO DIFFERENT
BRANCHES FOR EACH FIELD RELAY AS SPECIFIED ON THE LIGHTING PLAN(S).
6. NEUTRAL AND GROUND WIRES ARE NOT REQUIRED FOR EACH FIELD RELAY.
NOTES
TO OTHER
LIGHTING LOADS
FIFTH LIGHT DALI-ANALOG CONVERTER (DAC) MODULE
DAC
MODULE
LINE IN/BLACK
LINE OUT/BLACK
GROUND (EARTH GROUND)
LINE VOLTAGE
NEUTRAL
DALI BUS WIRE
DALI BUS WIRE
LIGHTING LOAD
LIGHTING LOAD
6
1. EACH DALI BUS REQUIRES TWO (2) #16 AWG WIRES MINIMUM. EACH PAIR OF DALI WIRES
CAN BE RUN IN FREE AIR OR IN THE SAME POWER CONDUIT AS THE LIGHTING BRANCH
CIRCUIT CONDUCTORS IF THE WIRES ARE INSULATED FOR AT LEAST THE SAME VOLTAGE
AS THAT OF THE CIRCUIT HAVING THE HIGHEST VOLTAGE. CONTRACTOR IS RESPONSIBLE
TO ENSURE INSTALLATION MEETS ALL LOCAL ELECTRICAL CODES.
2. EACH DALI BUS MUST NOT EXCEED A MAXIMUM DISTANCE OF 300 METERS BETWEEN THE
FURTHEST DALI DEVICE AND THE DESIGNATED LIGHTING CONTROL PANEL (LCP).
3. EACH DALI BUS CAN HAVE A MAXIMUM OF SIXTY FOUR (64) DALI DEVICES, WHICH CAN BE
CONNECTED IN PARALLEL BUS CONFIGURATION. CONTRACTOR TO FOLLOW DALI BUS
DESIGN PROVIDED ON THE LIGHTING PLAN(S).
4. CONTRACTOR TO TERMINATE ALL DALI BUS WIRES AT A DESIGNATED LCP ACCORDING TO
THE "LCP SCHEDULE(S)" PROVIDED .
5. FOR A LIGHTING CIRCUIT FEEDING A COMBINATION OF DALI BALLASTS, FIELD RELAYS,
DAC AND DIMMING MODULES, MAKE SURE TO SPLIT UP THE CIRCUIT INTO DIFFERENT
BRANCHES FOR EACH DALI-ANALOG CONVERTER (DAC) MODULE AS SPECIFIED ON THE
LIGHTING PLAN(S).
6. NEUTRAL AND GROUND WIRES ARE NOT REQUIRED FOR EACH DAC MODULE.
7. POLARITY FOR 0-10V WIRES MUST BE STRICTLY FOLLOWED FROM ONE FIXTURE TO THE
NEXT.
NOTES
+
-
+
-
TO OTHER
LIGHTING LOADS
TO OTHER
0-10V DIMMING FIXTURES
7
RED
N/WHITE
L/BLACK
DALI/PURPLE
DALI/PURPLE
RED
BLUE
BLUE
GND/GREEN
GROUND (EARTH GROUND)
NEUTRAL
LINE VOLTAGE
DALI LOOP TO OTHER BALLASTS (MAX. OF 63 PER LOOP)
DALI BALLAST
GENERIC DALI DIMMING BALLAST (1-LAMP FIXTURES)
FIXTURE CHASSIS
BALLAST DISCONNECT
TO LAMP HOLDERS
1. EACH DALI LOOP REQUIRES TWO (2) #16 AWG MINIMUM. PURPLE WIRES C/W
600V INSULATION RATING WHEN ROUTED WITH POWER WIRING IN CONDUIT
OR PLENUM-RATED CABLING C/W VIOLET JACKET (BELDEN 6200UE.0071000
C/W VIOLET JACKET).
2. EACH PAIR OF DALI WIRES CAN BE RUN IN FREE AIR OR IN THE SAME
POWER CONDUIT AS THE LIGHTING BRANCH CIRCUIT CONDUCTORS IF THE
WIRES ARE INSULATED FOR AT LEAST THE SAME VOLTAGE AS THAT OF THE
CIRCUIT HAVING THE HIGHEST VOLTAGE.
3. EACH DALI BUS LOOP MUST NOT EXCEED A MAXIMUM DISTANCE OF 300
METERS BETWEEN THE FURTHEST DALI DEVICE AND THE DESIGNATED
LIGHTING CONTROL PANEL (LCP).
4. EACH DALI BUS LOOP CAN HAVE A MAXIMUM OF SIXTY FOUR (64) DALI
BALLASTS, WHICH CAN BE CONNECTED IN PARALLEL BUS CONFIGURATION.
THE NEAREST DALI DEVICE CAN BE "HOME-RUN" BACK TO THE DESIGNATED
LCP.
5. ELECTRICAL CONTRACTOR TO TERMINATE ALL DALI LOOP WIRES AT THE
LCP ACCORDING TO THE "LCP SCHEDULES" PROVIDED.
NOTES
DALI BUS
DALI BUS
FIFTH LIGHT DALI MULTI-TECH SENSOR
"DALIx"
1. EACH DALI BUS REQUIRES TWO (2) #16 AWG WIRES MINIMUM. EACH PAIR OF DALI WIRES CAN BE RUN IN FREE AIR OR IN
THE SAME POWER CONDUIT AS THE LIGHTING BRANCH CIRCUIT CONDUCTORS IF THE WIRES ARE INSULATED FOR AT
LEAST THE SAME VOLTAGE AS THAT OF THE CIRCUIT HAVING THE HIGHEST VOLTAGE. CONTRACTOR IS RESPONSIBLE TO
ENSURE INSTALLATION MEETS ALL LOCAL ELECTRICAL CODES.
2. EACH DALI BUS MUST NOT EXCEED A MAXIMUM DISTANCE OF 300 METERS BETWEEN THE FURTHEST DALI DEVICE AND
THE DESIGNATED LIGHTING CONTROL PANEL (LCP).
3. EACH DALI BUS CAN HAVE A MAXIMUM OF SIXTY FOUR (64) DALI DEVICES, WHICH CAN BE CONNECTED IN PARALLEL BUS
CONFIGURATION. CONTRACTOR TO FOLLOW DALI BUS DESIGN PROVIDED ON THE LIGHTING PLAN(S).
4. CONTRACTOR TO TERMINATE ALL DALI BUS WIRES AT A DESIGNATED LCP ACCORDING TO THE "LCP SCHEDULE(S)"
PROVIDED .
NOTES
FIFTH LIGHT DALI 4 BUTTON KEYPAD w/ RAISE LOWER
DALI KEYPAD
DALI LOOP
DALI LOOP
1. EACH DALI BUS REQUIRES TWO (2) #16 AWG WIRES MINIMUM. EACH PAIR OF DALI WIRES CAN BE RUN IN FREE AIR OR IN
THE SAME POWER CONDUIT AS THE LIGHTING BRANCH CIRCUIT CONDUCTORS IF THE WIRES ARE INSULATED FOR AT
LEAST THE SAME VOLTAGE AS THAT OF THE CIRCUIT HAVING THE HIGHEST VOLTAGE. CONTRACTOR IS RESPONSIBLE TO
ENSURE INSTALLATION MEETS ALL LOCAL ELECTRICAL CODES.
2. EACH DALI BUS MUST NOT EXCEED A MAXIMUM DISTANCE OF 300 METERS BETWEEN THE FURTHEST DALI DEVICE AND
THE DESIGNATED LIGHTING CONTROL PANEL (LCP).
3. EACH DALI BUS CAN HAVE A MAXIMUM OF SIXTY FOUR (64) DALI DEVICES, WHICH CAN BE CONNECTED IN PARALLEL BUS
CONFIGURATION. CONTRACTOR TO FOLLOW DALI BUS DESIGN PROVIDED ON THE LIGHTING CONTROL LAYOUT(S).
4. CONTRACTOR TO TERMINATE ALL DALI BUS WIRES AT A DESIGNATED LCP ACCORDING TO THE "LCP SCHEDULE(S)"
PROVIDED .
5. EACH DALI KEYPAD IS IDENTIFIED BY "DLx" LABEL ON THE LIGHTING CONTROL LAYOUT(S), WHERE 'x" DENOTES DALI BUS
NUMBER.
NOTES
"DLx"
5
ZONE 1
ZONE 2
ZONE 3
ZONE 4
##########
AS NOTED
E6
-
Project Specific:
Drawn By:
Drawing No.:
Checked By:
· Drawings are meant to be read, and not scaled
· Dimensions to be verified on site
· Contractors must check and verify all dimensions and
report discrepancies to the Project Coordinator before
commencing with work
· All drawings remain the property of Sheridan College
and shall not be reproduced or reused without written
consent.
Construction North True North
General Notes:
Issues/RevisionsNo.
Project Name:
Seal:
Sheet Name:
Consultant(s):
Date
Issued Date:
Revision: Scale:
J106
CHILD & YOUTH CARE LAB
1
ISSUED FOR TENDER 05/19
S.K. N.C.
04-2019
N N
· Dispose of all material and debris within scope of
work offsite
· Make good of all areas affected by work to Sheridan
Standards.
· Coordinate all required testing and inspections
· Protect furniture, equipment and items to remain (ie.
flooring) during construction.
· Electrical Contractor shall verify capacity and location
of electrical panel required to complete scope of
work.
· Data Contractor shall verify capacity and location of
wiring closet required to complete scope of work.
· Refer to tender, specifications, instructions and all
other documents related to scope of work to complete
project.
Davis Campus
7899 McLauglin Road
Brampton, ON
(905) 459-7533
Trafalgar Campus
1430 Trafalgar Road
Oakville, ON
(905) 845 - 9430