jack last 2 pcl spanish banks

Download Jack last 2 pcl spanish banks

If you can't read please download the document

Upload: constitutiontunnel

Post on 16-Apr-2017

444 views

Category:

Technology


0 download

TRANSCRIPT

Hi! I'm Jack Last. I work for PCL Construction. We built quite a few projects for the BC Government.Hi! I'm Jack Last. I work for PCL Construction. We built quite a few projects for the BC Government.

It will take about 3 years to build to completion, a high speed rail train and highway tunnel under the Strait of Georgia from Rcihmond to Crofton! I'd like to know, How long will it take you to build a high speed train and highway tunnel across the Strait of Georgia?

Yes! About 3 years to completion with 4 conglomerates. Two at the Richmond side and two on the Crofton side. There will be 3 to 4 years preliminary work to complete then the constructors. 3 years?

Hi! I'm Jack Last. I work for PCL Construction. We built quite a few projects for the BC Government.

I was I was having my lunch at Spanish Banks in Vancouver when she came up to my truck. I'd heard she wanted to build a tunnel across the Strait of Georgia. Hi! I'm Jack Last. I work for PCL Construction. We built quite a few projects for the BC Government.

Yes! Three 3 years to completion. We need 4 conglomerates. Two for the Richmond side of the tunnel and two for the Crofton side of the tunnel. There will be 3 to 4 years of preliminary work to complete then 3 years of construction and post construction tests. Yes! Three 3 years to completion. We need 4 conglomerates. Two for the Richmond side of the tunnel and two for the Crofton side of the tunnel. There will be 3 to 4 years of preliminary work to complete then 3 years of construction and post construction tests.