Janet6 Update. Neil Shewry Project Manager. Agenda. Background Procurement What we’re building How we’re getting on Strategic Research Facilities Plans for the future. Background. SuperJanet5: 2006 to 2013. Janet6: Project to replace the UK wide Janet backbone, SuperJanet5. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Janet6 Update](https://reader036.vdocuments.net/reader036/viewer/2022062407/56812de5550346895d933e35/html5/thumbnails/1.jpg)
Neil ShewryProject Manager
Janet6 Update
![Page 2: Janet6 Update](https://reader036.vdocuments.net/reader036/viewer/2022062407/56812de5550346895d933e35/html5/thumbnails/2.jpg)
• Background• Procurement• What we’re building• How we’re getting on• Strategic Research Facilities• Plans for the future
Agenda
![Page 3: Janet6 Update](https://reader036.vdocuments.net/reader036/viewer/2022062407/56812de5550346895d933e35/html5/thumbnails/3.jpg)
Background
• Janet6: Project to replace the UK wide Janet backbone, SuperJanet5
Requirements gathering & analysis
2010 to 2011
Procurement• Fibre infrastructure• Optical transmission
equipment
Oct 2011 to Sept 2012
Rollout Sept 2012 to April 2013
Transition SJ5 to J6 May 2013 to July 2013
SJ5 ‘turned-off’ Oct 2013
SuperJanet5: 2006 to 2013
![Page 4: Janet6 Update](https://reader036.vdocuments.net/reader036/viewer/2022062407/56812de5550346895d933e35/html5/thumbnails/4.jpg)
• Fibre infrastructure contract signed: 31st July 2012
• Scottish & Southern Energy Telecoms (SSET)
• 4 year framework• 10 (+5) year contract• £30M
• Optical transmission contract signed: 6th September 2012
• Ciena Inc.• 7 year framework• Order for supply and 5 years support• £12.8M
Procurement
![Page 5: Janet6 Update](https://reader036.vdocuments.net/reader036/viewer/2022062407/56812de5550346895d933e35/html5/thumbnails/5.jpg)
What we’re building
5 delivery phases Core 4 Regional
RNs connect at multiples of 10G
Most are getting an upgrade
![Page 6: Janet6 Update](https://reader036.vdocuments.net/reader036/viewer/2022062407/56812de5550346895d933e35/html5/thumbnails/6.jpg)
What we’re building
I could go into more detail…
…but how good is your eyesight?
![Page 7: Janet6 Update](https://reader036.vdocuments.net/reader036/viewer/2022062407/56812de5550346895d933e35/html5/thumbnails/7.jpg)
What we’re building - Points of Presence• Vacating the Verizon Business PoPs
– Except for small presence in Glasgow and Reading• Existing Provider-Neutral PoPs
– Telehouse North, Telecity Harbour Exchange– Telecity Manchester, Scolocate
• New Provider-Neutral PoPs– Telecity Powergate, Telehouse West, Leeds (aql)
• SSET Core PoPs– Bradley Stoke, Erdington, Lowdham, Glasgow
• SSET Transmission PoPs– Multiplex circuits from regional fibres onto the backbone
• SSET In-Line Amplifier PoPs– Single rack, small amplifier shelf
• RNEPs
![Page 8: Janet6 Update](https://reader036.vdocuments.net/reader036/viewer/2022062407/56812de5550346895d933e35/html5/thumbnails/8.jpg)
What we’re building - Lightpath
• Increase bandwidth between backbone nodes to 100GE
• Topology reflects what is currently required
![Page 9: Janet6 Update](https://reader036.vdocuments.net/reader036/viewer/2022062407/56812de5550346895d933e35/html5/thumbnails/9.jpg)
• Acceptance of core infrastructure February 2013• Acceptance of regional infrastructure March 2013
How we’re getting on – fibre
![Page 10: Janet6 Update](https://reader036.vdocuments.net/reader036/viewer/2022062407/56812de5550346895d933e35/html5/thumbnails/10.jpg)
How we’re getting on – DWDM equipment• Ciena 6500 platform• All kit is in the country
40% on site 60% in staging
• Deployment began in January Staging Delivery Installation Commissioning
• Completion end April 2013
![Page 11: Janet6 Update](https://reader036.vdocuments.net/reader036/viewer/2022062407/56812de5550346895d933e35/html5/thumbnails/11.jpg)
• Upgrade: Juniper T1600 Juniper T4000
How we’re getting on – IP routing equipment
• Professional Services
![Page 12: Janet6 Update](https://reader036.vdocuments.net/reader036/viewer/2022062407/56812de5550346895d933e35/html5/thumbnails/12.jpg)
• Regional Network Readiness Space & power RNEP router capability
• Transition Planning• Operational Readiness
PoP Control Fault Management Network Management
• Service Management SSET Ciena
• Decommissioning
How we’re getting on – other stuff
![Page 13: Janet6 Update](https://reader036.vdocuments.net/reader036/viewer/2022062407/56812de5550346895d933e35/html5/thumbnails/13.jpg)
• Government e-Infrastructure initiative– £26m funding to Janet
• £10m for Janet6 backbone
• £12m for phase 1 (below)
• £4m for ‘industrial connectivity’
• Phase 1– Met Office, Exeter– Norwich Research Park– Hinxton Campus, Cambridge– (Francis Crick Institute, St Pancras)
Strategic Research Facilities
![Page 14: Janet6 Update](https://reader036.vdocuments.net/reader036/viewer/2022062407/56812de5550346895d933e35/html5/thumbnails/14.jpg)
• LOTS of bandwidth– 100Gbit/s x 88 channels = 8.8Tbit/s– 400Gbit/s?
• Strategic Research Facilities – possible phase 2• Thames Valley Network• South Region (formerly LeNSE)
• Other regional networks?• Individual customers?
Plans for the future
![Page 15: Janet6 Update](https://reader036.vdocuments.net/reader036/viewer/2022062407/56812de5550346895d933e35/html5/thumbnails/15.jpg)
Janet, Lumen HouseLibrary Avenue, Harwell OxfordDidcot, Oxfordshiret: +44 (0) 1235 822200f: +44 (0) 1235 822399e: [email protected]
Questions?