MEETING PURPOSE
• Inform the Public• Public Input
– Are there any other locations or key issues that we should address?– Are there any other ideas for potential solutions?
Study Area
www.wd-ae.com
JANUARY 9, 2002
STUDY INITIATION
The Scajaquada Expressway:• Is not in harmony with adjacent land uses
including educational and cultural institutions
• Disturbs aesthetics of historic Olmsted designed Delaware Park
• Has periods of congestion• Has accident problems
JANUARY 9, 2002
STUDY ADVISORY GROUP
• City of Buffalo• NYSDOT• Erie County• GBNRTC• Federal, State, and City
Elected Officials• AAA• BECHS• Buffalo Olmsted Parks
Conservancy• Delaware Park Steering
Committee• Leadership Buffalo
• Medaille College • The New Millennium
Group • New York State Motor
Truck Association• The Olmsted Crescent• Parkside Community
Association• The Preservation Coalition• State University College @
Buffalo• Western New York
Trucking Association
JANUARY 9, 2002
STUDY OBJECTIVE
• Determine potential transportation improvements for all modes of travel
• Determine impacts of potential transportation improvements
• Create a unifying facility that enhances the ambience of the surrounding historic, cultural and educational environment
JANUARY 9, 2002
STUDY PURPOSE
• Identify Potential Projects
• Assist with Policy Decisions
JANUARY 9, 2002
STUDY PROCESS
October 18, 2001
November 28, 2001
January 31, 2002
June, 2002
October, 2002
January, 2003
March, 2003
January 9, 2002
April, 2002
January, 2003
Initial StakeholderMeeting
Study KickoffStakeholder Input for Key Issues
Tech Memo 1Existing Conditions,
Problem Id, Key Issues andOptions
PublicInformation
MeetingDraft Study
Final Study/EPPCompleted
Advisory Group MeetingStudy Overview
Advisory Group Input for Key Issues
Tech Memo 2Evaluation of Needs and
Assessments for Selected Alternatives
Tech Memo 3Conceptual Alternative Development
with Study Costs and Schedule
PublicInformation
Meeting
PublicInformation
Meeting
JANUARY 9, 2002
STUDY ASSUMPTIONS
• Significant modifications to the elevation or alignment will not be made
• Corridor will not be filled in or covered
• Alternatives will be progressed to re-engineer the corridor such that it will fit in better with the surrounding area
JANUARY 9, 2002
EXISTING CONDITIONS
• Traffic– Functionally classified as an urban principal arterial expressway– Average annual daily traffic is up to 55,000 vehicles per day– The Parkside intersection operates at a poor level of service– Pedestrian/bicyclist access to separate portions of the park is
problematic
• Safety– A high volume of rear end accidents at Lincoln Park EB entrance
ramp, Nottingham ramp, Delaware Avenue EB entrance ramps, and Agassiz Circle
– Conflicts between pedestrian/bicyclists and motor vehicles at crossings
• Aesthetics
JANUARY 9, 2002
EXISTING TRAFFIC
JANUARY 9, 2002
EXISTING TRAFFIC
JANUARY 9, 2002
EXISTING SAFETY
JANUARY 9, 2002
EXISTING AESTHETICS
JANUARY 9, 2002
1 Address vehicle capacity issues/concerns
Agassiz Circle Key Issues
1
JANUARY 9, 2002
1 Address vehicle capacity issues/concerns
1 Address vehicle capacity issues/concerns
2 High visibility pedestrian signals, crosswalks, etc.
Agassiz Circle Key Issues
2
JANUARY 9, 2002
1 Address vehicle capacity issues/concerns
1 Address vehicle capacity issues/concerns
2 High visibility pedestrian signals, crosswalks, etc.
1 Address vehicle capacity issues/concerns
2 High visibility pedestrian signals, crosswalks, etc.
3 Historic park entrance issues
Agassiz Circle Key Issues
3
JANUARY 9, 2002
1 Address vehicle capacity issues/concerns
1 Address vehicle capacity issues/concerns
2 High visibility pedestrian signals, crosswalks, etc.
1 Address vehicle capacity issues/concerns
2 High visibility pedestrian signals, crosswalks, etc.
3 Historic park entrance issues
1 Address vehicle capacity issues/concerns
2 High visibility pedestrian signals, crosswalks, etc.
3 Historic park entrance issues
4 Roundabout
Agassiz Circle Key Issues
44
JANUARY 9, 2002
1 Address vehicle capacity issues/concerns
1 Address vehicle capacity issues/concerns
2 High visibility pedestrian signals, crosswalks, etc.
1 Address vehicle capacity issues/concerns
2 High visibility pedestrian signals, crosswalks, etc.
3 Historic park entrance issues
1 Address vehicle capacity issues/concerns
2 High visibility pedestrian signals, crosswalks, etc.
3 Historic park entrance issues
4 Roundabout
1 Address vehicle capacity issues/concerns
2 High visibility pedestrian signals, crosswalks, etc.
3 Historic park entrance issues
4 Roundabout5 Pedestrian bridge
Agassiz Circle Key Issues
5
JANUARY 9, 2002
1 Address vehicle capacity issues/concerns
1 Address vehicle capacity issues/concerns
2 High visibility pedestrian signals, crosswalks, etc.
1 Address vehicle capacity issues/concerns
2 High visibility pedestrian signals, crosswalks, etc.
3 Historic park entrance issues
1 Address vehicle capacity issues/concerns
2 High visibility pedestrian signals, crosswalks, etc.
3 Historic park entrance issues
4 Roundabout
1 Address vehicle capacity issues/concerns
2 High visibility pedestrian signals, crosswalks, etc.
3 Historic park entrance issues
4 Roundabout5 Pedestrian bridge
Agassiz Circle Key Issues
1 Address vehicle capacity issues/concerns
2 High visibility pedestrian signals, crosswalks, etc.
3 Historic park entrance issues
4 Roundabout5 Pedestrian bridge6 Add a driveway from
Park Maintenance Facility to Meadowview Drive
6
JANUARY 9, 2002
Parks Maintenance Center Key Issues
1 Relocate facility
JANUARY 9, 2002
Parks Maintenance Center Key Issues
1 Relocate facility1 Relocate facility
2 Add a signal at main driveway
2
JANUARY 9, 2002
Parks Maintenance Center Key Issues
1 Relocate facility1 Relocate facility
2 Add a signal at main driveway
1 Relocate facility
2 Add a signal at main driveway
3 Add an acceleration lane
3
JANUARY 9, 2002
Parks Maintenance Center Key Issues
1 Relocate facility1 Relocate facility
2 Add a signal at main driveway
1 Relocate facility
2 Add a signal at main driveway
3 Add an acceleration lane
1 Relocate facility
2 Add a signal at main driveway
3 Add an acceleration lane
4 Tunnel/bridge access directly to park
4
JANUARY 9, 2002
Parks Maintenance Center Key Issues
1 Relocate facility1 Relocate facility
2 Add a signal at main driveway
1 Relocate facility
2 Add a signal at main driveway
3 Add an acceleration lane
1 Relocate facility
2 Add a signal at main driveway
3 Add an acceleration lane
4 Tunnel/bridge access directly to park 5
1 Relocate facility
2 Add a signal at main driveway
3 Add an acceleration lane
4 Tunnel/bridge access directly to park
5 Extend deceleration lane
JANUARY 9, 2002
Parks Maintenance Center Key Issues
1 Relocate facility1 Relocate facility
2 Add a signal at main driveway
1 Relocate facility
2 Add a signal at main driveway
3 Add an acceleration lane
1 Relocate facility
2 Add a signal at main driveway
3 Add an acceleration lane
4 Tunnel/bridge access directly to park
1 Relocate facility
2 Add a signal at main driveway
3 Add an acceleration lane
4 Tunnel/bridge access directly to park
5 Extend deceleration lane
1 Relocate facility
2 Add a signal at main driveway
3 Add an acceleration lane
4 Tunnel/bridge access directly to park
5 Extend deceleration lane6 Add a driveway from
Park Maintenance Facility to Meadowview Drive
6
JANUARY 9, 2002
Radio Tower Key Issues
1 Eliminate access from Route 198
1
JANUARY 9, 2002
Radio Tower Key Issues
1 Eliminate access from Route 198
1 Eliminate access from Route 198
2 Eliminate entire facility2
RelocateTower
JANUARY 9, 2002
Delaware Interchange Key Issues
1 Replace Nottingham entrance/exit ramp 31
JANUARY 9, 2002
Delaware Interchange Key Issues
1 Replace Nottingham entrance/exit ramp
1 Replace Nottingham entrance/exit ramp
2 Diamond interchange 2
222
2
2
JANUARY 9, 2002
Delaware Interchange Key Issues
1 Replace Nottingham entrance/exit ramp
1 Replace Nottingham entrance/exit ramp
2 Diamond interchange
1 Replace Nottingham entrance/exit ramp
2 Diamond interchange3 Pedestrian tunnel/bridge
to connect meadow and lake
3
JANUARY 9, 2002
Delaware Interchange Key Issues
4 At grade intersection
14
14 14
JANUARY 9, 2002
Delaware Interchange Key Issues
4 At grade intersection
4
14 14
4 At grade intersection5 Offset at grade
intersection
55
15 15
5
RecreationPath
JANUARY 9, 2002
North Lincoln Interchange
1 Eliminate ramp
Lincoln Interchange Key Issues
1
JANUARY 9, 2002
North Lincoln Interchange
1 Eliminate ramp
North Lincoln Interchange
1 Eliminate ramp
2 Eliminate pedestrian bridge, signalize intersection
Lincoln Interchange Key Issues
22
JANUARY 9, 2002
North Lincoln Interchange
1 Eliminate ramp
North Lincoln Interchange
1 Eliminate ramp
2 Eliminate pedestrian bridge, signalize intersection
Lincoln Interchange Key Issues
3
North Lincoln Interchange
1 Eliminate ramp
2 Eliminate pedestrian bridge, signalize intersection
South Lincoln Interchange
3 Narrow travel lane, embellish parking/pedestrian space
JANUARY 9, 2002
North Lincoln Interchange
1 Eliminate ramp
North Lincoln Interchange
1 Eliminate ramp
2 Eliminate pedestrian bridge, signalize intersection
Lincoln Interchange Key Issues
4
North Lincoln Interchange
1 Eliminate ramp
2 Eliminate pedestrian bridge, signalize intersection
South Lincoln Interchange
3 Narrow travel lane, embellish parking/pedestrian space
North Lincoln Interchange
1 Eliminate ramp
2 Eliminate pedestrian bridge, signalize intersection
South Lincoln Interchange
3 Narrow travel lane, embellish parking/pedestrian space
4 Close Lincoln to motor vehicles
JANUARY 9, 2002
North Lincoln Interchange
1 Eliminate ramp
North Lincoln Interchange
1 Eliminate ramp
2 Eliminate pedestrian bridge, signalize intersection
Lincoln Interchange Key Issues
North Lincoln Interchange
1 Eliminate ramp
2 Eliminate pedestrian bridge, signalize intersection
South Lincoln Interchange
3 Narrow travel lane, embellish parking/pedestrian space
North Lincoln Interchange
1 Eliminate ramp
2 Eliminate pedestrian bridge, signalize intersection
South Lincoln Interchange
3 Narrow travel lane, embellish parking/pedestrian space
4 Close Lincoln to motor vehicles
5
North Lincoln Interchange
1 Eliminate ramp
2 Eliminate pedestrian bridge, signalize intersection
South Lincoln Interchange
3 Narrow travel lane, embellish parking/pedestrian space
4 Close Lincoln to motor vehicles
5 Signalize intersection
JANUARY 9, 2002
1 Partial at grade intersection
Elmwood Interchange Key Issues
1
22
2
22
1
1
1
2121
1
JANUARY 9, 2002
1 Partial at grade intersection
1 Partial at grade intersection
2 Single point interchange
Elmwood Interchange Key Issues
222
2
222
22
JANUARY 9, 2002
1 Partial at grade intersection
1 Partial at grade intersection
2 Single point interchange
Elmwood Interchange Key Issues
JANUARY 9, 2002
1 Partial at grade intersection
1 Partial at grade intersection
2 Single point interchange
Elmwood Interchange Key Issues
1 Partial at grade intersection
2 Single point interchange3 Eliminate westbound exit
ramp 43
JANUARY 9, 2002
Buffalo State Key Issues
1 Vegetative wall covering along perimeter road
1
JANUARY 9, 2002
Buffalo State Key Issues
1 Vegetative wall covering along perimeter road
1 Vegetative wall covering along perimeter road
2 Vegetative buffer at parking lot
2
JANUARY 9, 2002
Buffalo State Key Issues
1 Vegetative wall covering along perimeter road
1 Vegetative wall covering along perimeter road
2 Vegetative buffer at parking lot
1 Vegetative wall covering along perimeter road
2 Vegetative buffer at parking lot
3 Add pedestrian bridge
JANUARY 9, 2002
Buffalo State Key Issues
1 Vegetative wall covering along perimeter road
1 Vegetative wall covering along perimeter road
2 Vegetative buffer at parking lot
1 Vegetative wall covering along perimeter road
2 Vegetative buffer at parking lot
3 Add pedestrian bridge
1 Vegetative wall covering along perimeter road
2 Vegetative buffer at parking lot
3 Add pedestrian bridge4 Add EB exit to Buffalo
State
JANUARY 9, 2002
Grant Interchange Key Issues
1 Landscape improvements
111
JANUARY 9, 2002
Grant Interchange Key Issues
1 Landscape improvements1 Landscape improvements
2 Selective pruning along creek
2
JANUARY 9, 2002
Grant Interchange Key Issues
1 Landscape improvements1 Landscape improvements
2 Selective pruning along creek
1 Landscape improvements
2 Selective pruning along creek
3 NYSDOT proposed improvements to bridge
3
JANUARY 9, 2002
Median/Lighting Options Key Issues
Options
Existing
JANUARY 9, 2002
General Key Issues
• Speed change
• Name change
• Roadside aesthetics
• Gateway
• Emergency pull offs
JANUARY 9, 2002
NEXT STEPS
• Address comments received from the public
• Prepare Technical Memorandum #1 - Existing Conditions, Problem Identification, Key Issues and Options
• Next Public Information Meeting Scheduled for April, 2002
JANUARY 9, 2002
QUESTIONS & COMMENTS
• Are there any other locations or key issues that we should address?
• Are there any other ideas for potential solutions?