JANUARY TO JUNE 2020
SFO3 Jaymar D Domingo, BFPOfficer-In-Charge
-
TABLE OF CONTENTS
I. GENERAL OVERVIEWA. Regional ProfileB. Jurisdictional Map
II. ADMINSTRATIVE UPDATESA. Personnel Administration
Personnel Strength / Rank ProfilePersonnel Training Profile
B. Promotion and RecruitmentC. Updates in the Implementation of the Philippine Anti-Drug Strategy
(PADS)III. LOGISTICAL UPDATES
A. Status of Fire Stations / SubstationsStatus of Construction of Fire Stations and BuildingsStatus of Repair of Fire Stations and Buildings
-
B. Status of Fire Apparatus, Ambulances, and Service VehicleStatus of Repair of Fire ApparatusStatus of Repair of Ambulances Status of Repair of Service Vehicle
IV. OPERATIONAL UPDATESA. Fire PreventionB. Fire SuppressionC. Fire InvestigationD. Emergency Medical/Dental and Rescue ServicesE. Updates on Non-Fire and Related Responses (BFP Responses during
Typhoons, Earthquakes, Natural and Man-Made Disasters / Calamities, Pandemics, Terrorists Attacks and Similar Events)V. BUDGETARY UPDATES
A. Status of Utilization of Funds VI. PLANS AND PROGRAMS
A. Physical Report of Operations B. Action Plan
-
I. GENERAL OVERVIEW
A. REGIONAL PROFILE
- San Mariano has a total land area of 146,950 hectares. It constitutes 13.78 percent of the total land area of the Province and is considered as the largest town in the country.
- The municipality lies in the eastern part of the Province of Isabela. It is bounded on the North by the Municipality of Ilagan, on the East by the Municipality of Palanan, on the South by the Municipality of San Guillermo and on the West by the Municipality of Benito Soliven. It is approximately 404 kilometers from Metro Manila and 46 kilometers from Ilagan, the provincial capital.
- San Mariano is located approximately on the grid coordinates of 160 57’41” to 170 00’08” north latitude and 1210 58’39” to 1220 01’20” east longitude.
-
B. JURISDICTIONAL MAP
-
AREA PROFILE
CITY/
MUNICIPALITY
NO. OF
BARANGAYS
LAND
AREA POPULATIONNO. OF
HOUSEHOLDS
NO. OF
ESTABLISHMENTS
SAN MARIANO 36
146,950
hectares
(363,100
acres)
55,370 (as
of 2015) 11,849
582 Business
Establishments
(as of 2019)
TOTAL 36 146,950 55,370 11,849 582
-
CITY/MU
NICIPALI
TY
OFFICER NON OFFICER
NUP TOTAL
SSUPT SUPT CINSP SINSP INSP SFO4 SFO3 SFO2 SFO1 FO3 FO2 FO1
SAN
MARIAN
O 1 2 10 13
TOTAL 1 2 10 13
II. ADMINISTRATIVE UPDATES
A. PERSONNEL ADMINISTRATION
Table IIA-1 PERSONNEL STRENGTH / RANK PROFILE
-
Table IIA-2 TRAINING PROFILE
CITY/MU
NICIPALIT
Y
OSEC PSOAC PSOBC FSOBCFPS
CFAIIC PSBRC FSBC
OTHER
S
NONE
/witho
ut
FBRC
TOTAL
SAN
MARIANO1 2 7 3
13
TOTAL1 2 7 3
13
B. PROMOTION AND RECRUITMENT
C. UPDATES IN THE IMPLEMENTATION OF THE PHILIPPINE ANTI-DRUG STRATEGY
(PADS)
-
IV. OPERATIONAL UPDATES
A. FIRE PREVENTION
STRUCTURAL
SAN
MA
RIA
NO
assem
bly
ed
uca
tio
na
l
Da
y c
are
He
alt
hc
are
Re
sid
en
tia
l b
oa
rd a
nd
care
De
ten
tio
n a
nd
co
rre
cti
on
al
ho
tel
do
rmit
ori
es
Ap
art
men
tb
uild
ing
Lo
dg
ing
an
d r
oo
min
g
ho
use
Sin
gle
an
d t
wo
fam
ily
dw
ell
ing
un
its
me
rca
nti
le
bu
sin
es
s
Ind
ustr
ial
sto
rag
e
Sp
ec
ial s
tru
ctu
re
No
ns
tru
ctu
ral (
ex v
eh
icle
use
d a
s r
oll
ing
sto
re &
etc
.)
TOTAL 7 0 0 0 0 0 0 0 0 6 0 335 70 30 26 15 0
-
SA
NM
AR
IAN
O
Bu
ild
ing
Pla
ns
Re
vie
we
d, P
roc
es
sed
, a
nd
Iss
ue
d F
SE
C
FS
IC O
cc
up
an
cy
FS
IC f
or
Bu
sin
es
s
FS
IC I
ss
ue
d f
rom
PE
ZA
FS
IC I
ss
ue
d f
or
Go
ve
rnm
en
t B
ldg
s
To
tal
FS
IC I
ss
ue
d (
Oc
cu
pa
nc
y, B
us
ine
ss
,
PE
ZA
, G
ovt
Bld
gs
)
No
tic
e t
o C
om
ply
Is
su
ed
No
tic
e t
o C
orr
ec
t V
iola
tio
ns
Is
su
ed
Ab
ate
me
nt
Ord
er
Iss
ue
d
RE
CO
MM
EN
DE
D F
OR
ST
OP
PA
GE
OF
OP
ER
AT
ION
S
AM
OU
NT
OF
FIR
E C
OD
E F
EE
S A
SS
ES
SE
D
TOTAL 4 1 489 0 0 489 0 0 0 0 416,470.00
-
NUMBER OF ESTABLISHMENTS INSPECTED PER CITY/MUNICIPALITY
CITY/MUNICIALI
TY
as of 2ND Quarter
(previous)
as of 2ND Quarter
(2020)Variance
SAN MARIANO 81 49 -65.306
-
NUMBER OF ESTABLISHMENTS INSPECTED PER CITY/ MUNICIPALITY
CITY/MUNICIALITYas of 1ST Semester
2019as of 1st Semester *2020 Variance
SAN MARIANO 389 489 20.45
-
NUMBER OF ESTABLISHMENTS INSPECTED PER CITY/MUNICIPALITY
CITY/MUNICIPALI
TYas of CY 2019 as of CY *2020 Variance
SAN MARIANO 582 489 6.339
-
CITY/MUNICIPALITY 2ND QUARTER (2019) 2ND QUARTER (2020) VARIANCE
SAN MARIANO 88,947.00 36,815.00 -141.605
FIRE CODE FEES COLLECTON PER PROVINCE AS OF 2ND QUARTER
-
CITY/MUNICIPALITY 1ST SEMESTER (Previous Year)
1ST SEMESTER (Current Year)
VARIANCE
SAN MARIANO 248,845.00 416,465.00 40.248
FIRE CODE FEES COLLECTON PER PROVINCE AS OF 1ST SEMESTER
-
CITY/MUNICIPALITY 2019 Previous Year) 2020 (Current Year) VARIANCE
SAN MARIANO 363,509.00 416,470.00 12.717
FIRE CODE FEES COLLECTON PER PROVINCE AS OF 2020 (YEAR)
-
B. FIRE SUPPRESSION
FIRE INCIDENT COMPARATIVE REPORT
KINDS OCCUPANCY
Covering
period
(previous)
Covering
period (Jan-
Jun 2020)
VARIANCE
ST
RU
CT
UR
AL F
IRE
Residential 2 0
Industrial/Factory 0 0
Commercial/Mercantile 0 0
Storage 1 0
Mixed 0 0
Business/Gov't Offices 0 1
Educational 0 0
Institutional 0 0
Place of Assembly 0 0
Miscellaneous 0 0
TOTAL
NO
N
ST
RU
CT
UR
AL
FIR
E
Grass, Rubbish and Forest Fire 1 0
Motor Vehicle 1 1
Ship/Water Vessel 0 0
Aircraft 0 0
Locomotive 0 0
TOTAL 5 2 -249
AMOUNT OF DAMAGE BASED ON SUBMITTED AFFIDAVIT OF
LOSS
-
CA
US
ES
OF
FIR
E
DESCRIPTION
Covering
period
(previous)
Covering
period (Jan –
Jun 2020)
VARIANCE
Electrical connection 5 2 -249
Electrical appliances
Electrical machinery
Spontaneous combustion
Unattended cooking/stove
Open flame due to
torch/gasera
LPG Explosion
Lighted cigarette butt
Chemicals
Pyrotechniques
Lighted match stick/lighter
Incendiary
devices/flammable liquid
Lightning
Bomb explosion
Undetermined
Others
TOTAL 5 2 -249
C. FIRE INVESTIGATION
FIRE INVESTIGATION COMPARATIVE REPORT
-
CLA
SS
IFIC
AT
ION
OF
FIR
E
Intentional
Accidental fire 5 2 -249
Undetermined
Fire cases under
investigation
TOTAL
CA
SU
ALT
IES
Fatalities in fire fighter
Fatalities in fire civilian
Injuries in fire fighter
Injuries in fire civilian
TOTAL 5 2 -249
CONTINUATION: FIRE INVESTIGATION COMPARATIVE REPORT
-
EMERGENCY RESPONSE
ACTIVITIES
Covering
period
(2019)
Covering
period (Jan-
Jun 2020)
VARIANCE
FIRE INCIDENTS 9 2 -350
RESCUE
OPERATIONAL/DESASTERS
VEHICULAR ACCIDENTS
MEDICAL CASES
TOTAL
NON EMERGENCY RESPONSE
FREE MEDICAL AND DENTAL
SERVICES
TT VACCINATION
BLOOD LETTING 2
CONSULATION
BP MONITORING
DRILL CONDUCTED 20 10 -100
OTHERS
TOTAL 22 10 -120
D. EMERGENCY MEDICAL SERVICES AND RESCUE SERVICES
EMS/RESCUE COMPARATIVE REPORT
-
CITY/MUNICIPALITY OFSAN MARIANO Total
Household
(BRGY)
Household
Affected
1. Households in disaster/calamity-affected barangays rendered with
assistance
2. Individuals rendered with technical rescue assistance/intervention
3. Non-emergency cases rendered with assistance by BFP
4. Local, National and International events deployed with BFP
contingents
5. LGU's extended with technical trainings by BFP
E. UPDATES ON NON-FIRE AND RELATED RESPONSES (BFP RESPONSES DURING TYPHOONS,
EARTHQUAKES, NATURAL AND MAN-MADE DISASTERS / CALAMITIES, PANDEMICS, TERRORISTS
ATTACKS AND SIMILAR EVENTS)
-
STATUS OF CONSTRUCTION OF FIRE STATION AND BUILDINGS AS OF 2020
III. LOGISTICS UPDATES
I.STATUS OF FIRE STATION/SUBSTATION
REGION 02
DATE
AWARDE
D
BUDGETAMOUNT OF
CONTRACT
PROGRESS OF
CONSTRUCTIO
N (% of
Accomplishme
nt)
DATE OF
COMPLETI
ON
REMARK
S
Province of Isabela
Municipal Fire
Station 1 NEGATIVE
Municipal Fire
Station 2
City Fire Station 1
City Fire Station 2
Province B
Municipal Fire
Station 1
Municipal Fire
Station 2
City Fire Station 1
City Fire Station 2
Prepared by: Certified Correct: Approved:
-
STATUS OF REPAIR OF FIRE STATION AND BUILDINGS
As of January to June 2020
REGION 02
DATE
AWARDE
D
BUDGETAMOUNT OF
CONTRACT
PROGRESS OF
CONSTRUCTIO
N (% of
Accomplishme
nt)
DATE OF
COMPLETI
ON
REMARK
S
Province of Isabela
Municipal Fire
Station 1 NEGATIVE
Municipal Fire
Station 2
City Fire Station 1
City Fire Station 2
Province B
Municipal Fire
Station 1
Municipal Fire
Station 2
City Fire Station 1
City Fire Station 2
Prepared by: Certified Correct: Approved:
-
STATUS OF REPAIR OF FIRETRUCK
As of January to June 2020
REGION 02
DATE
AWARDE
D
BUDGET
AMOUNT
OF
CONTRAC
T
PROGRESS OF
CONSTRUCTION
(% of
Accomplishment)
DATE OF
COMPLETIO
N
REMARK
S
Province of Isabela
Municipal Fire
Station 1
NEGATIVE
Municipal Fire
Station 2
City Fire Station 1
City Fire Station 2
Province B
Municipal Fire
Station 1
Municipal Fire
Station 2
City Fire Station 1
City Fire Station 2
Prepared by: Certified Correct: Noted and Approved
B. STATUS OF FIRE APPARATUS, AMBULANCES AND SERVICE VEHICLE
-
STATUS OF REPAIR OF AMBULANCE
As of January to June 2020
REGION 02
DATE
AWARDE
D
BUDGET
AMOUNT
OF
CONTRACT
PROGRESS OF
CONSTRUCTION
(% of
Accomplishment)
DATE OF
COMPLETI
ON
REMARK
S
Province of Isabela
Municipal Fire
Station 1NEGATIVE
Municipal Fire
Station 2
City Fire Station 1
City Fire Station 2
Province B
Municipal Fire
Station 1
Municipal Fire
Station 2
City Fire Station 1
City Fire Station 2
Prepared by: Certified Correct: Noted and Approved:
-
STATUS OF REPAIR OF SERVICE VEHICLE
As of January to June 2020
REGION 02
DATE
AWARDE
D
BUDGET
AMOUNT
OF
CONTRACT
PROGRESS OF
CONSTRUCTION
(% of
Accomplishment)
DATE OF
COMPLETI
ON
REMARK
S
Province of Isabela
Municipal Fire
Station 1NEGATIVE
Municipal Fire
Station 2
City Fire Station 1
City Fire Station 2
Province B
Municipal Fire
Station 1
Municipal Fire
Station 2
City Fire Station 1
City Fire Station 2
Prepared by: Certified Correct: Noted and Approved:
-
V. BUDGETARY UPDATES
A. Status of Utilization of Funds as of June 2020
TOTAL
OFFICE2nd QTR
(751) APRIL(755) MAY (755) JUNE(755)TOTAl (755) APRIL(761) MAY(761) JUNE(761)
TOTAL (761)
SAN MARIANO 5,000.00 3,333.00 3,333.00 3,334.0010,000.00 10,121.94 10,121.94 10,121.94 30,365.82 45,365.82
TOTAL
OFFICE1ST QTR
(751)JANUARY(
755)FEBRUARY
(755)MARCH
(755)TOTAl (755)
JANUARY(761)
FEBRUARY(761)
MARCH(761)
TOTAL (761)
SAN MARIANO 5,000.00 3,333.00 3,333.00 3,334.0010,000.00 11,050.56 11,050.56 11,050.56 33,151.68 48,151.68
-
VI. PLANS AND PROGRAMS A. Physical Report of Operation as of JANUARY TO JUNE 2020
FIRE PREVENTION MANAGEMENT PROGRAM MONTH REGISTER
ED BPLO CY 2020
DATA
NO. OF GOVERN
MENT OWNED
BUILDING
PRIVATELY OWNED BUILDING
/ STRUCTURE NOT REQUIRING FSIC
NON STRUCTU
RAL (Motor vehicle, Motor Banca,
Pedicaband the
likes)
TOTAL TARGETS
FOR CY2020
buildings and
establishments
inspected covered by Fire Code
FSIC rated
buildings and
structure that has not been the cause
of fire incident
(origin of fire)
total number of FSIC rated
buildings/
establishments
buildings and
establishments
inspected within
the prescribe
d time frame
FIRE PREVENTI
ON MANAGE
MENT PROGRA
M -INDICAT
OR 1
FIRE PREVENTI
ON MANAGE
MENT PROGRA
M -INDICAT
OR 2
FIRE PREVENTI
ON MANAGE
MENT PROGRA
M -INDICAT
OR 3
FIRE PREVENTI
ON MANAGE
MENT PROGRA
M -INDICAT
OR 4
January 412 412
329 329 329 329 79.85% 100.00% 100.00% 1
February 35 35
70 70 70 70 200.00% 100.00% 100.00% 2
March 45 45 41 41 41 41
91.11% 100.00% 100.00% 1
April 7 7 3 3 3 3
42.86% 100.00% 100.00%
May 20 20 17 17 17 17 85.00% 100.00% 100.00%
June 32 32 29 29 29 29 90.63% 100.00% 100.00%
SUB-TOTAL
TOTAL551 551 551 489 489 489 489 6 6 6 4
-
FIRE AND EMERGENCY MANAGEMENT PROGRAM - Fire Operations Activities1.Percentage (%) of fire, emergency and rescue calls responded nationwide (fire related) against total number of fire, EMS and rescue calls2. Percentage (%) of fire calls not exceeding 300,000 estimated property damage out of the total number of fire calls nationwide3. Percentage (%) of fire calls and related emergencies responded within seven (7) minutes (from receipt of call until arrival on the fire scene) against total fire and emergency calls
MONTH
CALLS RESPONDS
FIRE CALLS
NOT
EXCEEDING
300,000
WITHIN 7 MINUTES Fire Operations
Activities -
INDICATOR 1
Fire
Operations
Activities -
INDICATOR 2
Fire
Operations
Activities -
INDICATOR 3
FIRE CALLSEMS CALLS
(fire related)
RESCUE
CALLS (fire
related)
TOTAL
NUMBER OF
CALLS
FIRE CALLS
RESPONDED
EMS CALLS
RESPONDED
RESCUE
CALLS
RESPONDED
TOTAL
NUMBER OF
CALLS
RESPONDED
FIRE EMS
TOTAL
NUMBER OF
FIRE AND
EMS CALLS
RESPONDED
WITHIN 7
MIN.
(13)=(8)/(4) (14)=(9)/(1) (15)=(12)/(1)+(2)
January0 0 0 0 0 0 0 0 0 0 0 0
#DIV/0! #DIV/0! #DIV/0!
February 0 0 0 0 0 0 0 0 0 0 0 0
#DIV/0! #DIV/0! #DIV/0!
March 1 0 0
1 1 0 0 1 0 1 0 1 100.00% 0 1
April 1 0 0
1 1 0 0 1 0 1 0 1 100.00% 0 1
May 0 0 0 0 0 0 0 0 0 0 0 0
#DIV/0! #DIV/0! #DIV/0!
June 0 0 0 0 0 0 0 0 0 0 0 0
#DIV/0! #DIV/0! #DIV/0!
SUB-TOTAL
2 0 0 2 2 0 0 2 0 2 0 2
TOTAL 2 0 0 2 2 0 0 2 0 2 0 2
-
FIRE AND EMERGENCY MANAGEMENT PROGRAM - Non-Fire Response Activities1. Percentage (%) of households in disaster/calamity-affected barangays rendered with assistance against total 2.Number of individuals rendered with technical rescue assistance/intervention3.Number of Non-emergency cases rendered with assistance by BFP4.Number of Local, National and International events deployed with BFP contingents 5. Number of LGUs extended with technical trainings by BFP
MONTH
TOTAL HOUSEHOLDS IN
DISASTER/ CALAMITY-
AFFECTED BARANGAYS HOUSEHOLDS AFFECTED
RENDERED WITH ASSISTANCE
Non-Fire Response
Activities - INDICATOR 1
Non-Fire Response
Activities - INDICATOR 2
Non-Fire Response
Activities - INDICATOR 3
Non-Fire Response
Activities - INDICATOR 4
Non-Fire Response
Activities - INDICATOR 5
January 0 0
#DIV/0!
0 0 0 0
February 0 0
#DIV/0!
0 0 0 0
March 0 0
#DIV/0!
0 0 1 0
April 0 0
#DIV/0!
0 0 1 0
May 0 0
#DIV/0!
0 0 3 0
June 0 0
#DIV/0!
0 0 2 0
SUB-TOTAL 0 0 0 0 0 7 0
TOTAL 0 0 0 0 0 7 0
-
FIRE AND EMERGENCY MANAGEMENT PROGRAM - Fire Investigation Activities1.Percentage (%) fire incidents investigated against total no. of fire incidents responded.2.Percentage (%) of arson fire cases filed in court against total no. of arson fires.3.Percentage (%) of fire incidents investigated with SPOT INVESTIGATION REPORT (SIR) submitted against total number of fire incident responded regionwide.
MONTHFIRE CALLS RESPONDED
FIRE INCIDENTS
INVESTIGATED
TOTAL NUMBER OF ARSON
FIRE
ARSON FIRE FILED IN
COURT
FIRE INCIDENTS
INVESTIGATED WITH SIR
Fire Investigation
Activities - INDICATOR 1
Fire Investigation
Activities - INDICATOR 2
Fire Investigation
Activities - INDICATOR 3
January 0 0 0 0 0
#DIV/0! #DIV/0! #DIV/0!
February 0 0 0 0 0
#DIV/0! #DIV/0! #DIV/0!
March 1 1 0 0 1
1 #DIV/0! 1
April 1 1 0 0 1
1 #DIV/0! 1
May 0 0 0 0 0
#DIV/0! #DIV/0! #DIV/0!
June 0
0 0 0 0 #DIV/0! #DIV/0! #DIV/0!
SUB-TOTAL
TOTAL 2 2 2 0 2 2 0 2
-
ISSUES AND
CONCERNS
ACTION TAKEN BY
REGIONAL OFFICE
ACTION TO BE
REQUESTED FROM NHQ
EXPECTED
OUTPUTTARGET DATE
1. Lack of
PPE’s (Fire
Coat and
Trousers)
2. Repair of
Fire Station
B. Action Plan as of __________________
ACTION PLAN
As of _______________