japanese activities concerning maidanak
DESCRIPTION
Japanese activities concerning Maidanak. Fumi Yoshida, Takashi Ito, Shigeru Takahashi, Kiichi Okita, Hiroshi Karoji, Shinobu Ozaki, (NAOJ), Toshifumi Yanagisawa, Hirohisa Kurosaki, Makoto Yoshikawa, Tomohiro Yamaguchi (JAXA), Noritsugu Takahashi, Seitaro Urakawa (JSGC), - PowerPoint PPT PresentationTRANSCRIPT
Fumi Yoshida, Takashi Ito, Shigeru Takahashi, Kiichi
Okita, Hiroshi Karoji, Shinobu Ozaki, (NAOJ), Toshifumi Yanagisawa, Hirohisa Kurosaki,
Makoto Yoshikawa, Tomohiro Yamaguchi (JAXA),
Noritsugu Takahashi, Seitaro Urakawa (JSGC), Hiroshi Ohtani (Kyoto Univ),
Yui Nozawa (JWU)
What we did in 20091. Cleaning of the mirror of 60cm telescope at
Maidanak observatory2009 August
2. Re-aluminizing the Maidanak mirrors at Okayama observatory
2009 October to 2010 May
3. Measuring the Seeing size of Maidanak sky2009 November
4. Holding seminars for asteroid’s observation and data reduction
2010 February
5. Planning on new instruments
6. Carrying out photometric observation of young family asteroids
What we did in 2009
Cleaning of the 60cm mirror at MaidanakMeasured reflectance of
the mirror by Scatterometer in 2009 August.
Before cleaning After cleaning
67.7% 81.1%
Relative Referectance of all mirrors at Maidanak
We measured reflectance of all existing mirrors at Maidanak observatory by Scatterometer in 2009 August.
mirror Before cleanin
g
After cleanin
g
note
60cm (sliding
roof)
67.7% 81.1% cleaned by K. Okita on 2009 Aug 29.
60cm (dome)
77.8% cleaned by Russia in 2009 July
1.5 m 85.9% cleaned by Russia in 2008 autumn
1.0 m 44.7% aluminized in Uzbek 7 years ago
60cm (spare)
44.8% (dirty part)
65.2% (clean part)
aluminized in Uzbek 7 years ago
dirty part 44.8%
clean part 65.2%
There is a spare mirror of the 60 cm telescope. It was aluminized in Uzbek 7 years ago. We decided to sent it to Japan and re-aluminized at Okayama Astrophysical observatory of NAOJ.
Export and import of the mirrors for re-aluminization
Tokyo2009.9.19
Wooden box for 60 cm
mirrorFumigated at Yokohama
UBAI2009.9.21
~ $ 1300
Increased
60cm
50cm
20cm 15cm
Packing
2009.10.23
2009.11.3
~ $ 3200
Okayama2010.1.25
Re-aluminizing2010.4.12-13
60cm
50cm
20cm 15cm
~ $ 2900
2010.5.6
UBAI2010.5.28
60cmMaidanak2010.6.?
About 8 months
Total cost ~$7400 $ 0
Date : 2010. 4. 12, 13
Done by : K.Okita, K.Yanagisawa, D.Kuroda, H.Koyano, E.Kanbe (Okayama) T. Ito, F. Yoshida, S. Urakawa (Asteroid group)
Procedure :
Re-aluminizing of 60cm mirror of Maidanak
Observatory
1. Wash it by water2. Remove old aluminum coating by
NaOH solution3. Polish the surface by 2NaHCO3 4. Wipe it by cotton cloth with alcohol 5. Install the mirrors in the Vacuum
chamber6. Pumping vacuum camber into 5X10-6
torr. (Use the cryio-pump & the Meissner-coil pump)
7. Ion-bombardment (3X10-2 torr 20min.) 8. One more Pumping vacuum camber into
5X10-6 torr. (Use the cryio-pump & the Meissner-coil pump)
9. Spatter aluminum (6 times X 6 filaments about 30min.)
10. Take out mirrors from the vacuum chamber
11. Packing mirrors to transportation boxs.
Okita-san will show you how we did the re-aluminiization with a lot of photos.
Measuring the Seeing size of Maidanak skyDate : 2009. 11. 17
Done by : T. Yanagisawa, H. Kurosaki
Unexpected result
Celestron C8
Vixen GPD
N.I.L. 1K1K
Celestron C8
N.I.L. 1K1K
N.I.L. 4K2.7K
Takahashi BRC250
Showa 25ELMaidanak Nyukasa
Date Seeing size
Nov. 16
2.03”
Nov.17 2.75”
Nov.18 2.64”
Nov.19 2.79”
Dr. Ito will present their results.
Seeing size measured by 60 cm telescope at Maidanak with R-band at airmass of 1.3.(By F.Y.)
The seeing size of Nov.17’s night is near average (?).
Tutorial of asteroid’s observation and data
reduction
Nyugasa-yama Optical Observatory 35 cm telescopeFebruary 13-16
Date : February 12 - 26, 2010Participants : Rivkat Karimov (UBAI), Chih-Yang Tai (NCU)
Okayama Astrophysics Observatory
1.88 m telescopeFebruary 18
Bisei Spaceguard Center 1 m telescope
February 18-20
Found 3 new asteroids
IRAF tutorial for data analysiscl scripting, python scriptingFebruary 23,24
http://www-irc.mtk.nao.ac.jp/~webadm/AA-AsianNet/index.php?J-plan2009#h25cda14
Planning on new instruments
1. Focal reducer of 60cm telescope for wide field debris surveyH. Ohtani will present
We investigated the structure of 60cm telescope in 2009 August.We discussed where encoders should be put around RA and DEC axes.The cost of the improvements was estimated 30 million yen.Now it’s pending.
2. Making 60 cm telescope automated
By K.O
The image of 107P/(4015) Wilson-Harrington, which is one of NEOs by 60 cm tel. at Maidanak.
Related to Dr. Urakawa’s talk
Photometric observation of young family
asteroids2005 Jun – How many asteroids did we observe so far? With which filter?
Asteroid name
Obs. period B V R I Total frames
1990rd1 2005 Jun02-Jun06 64 23 87
1990vz5 2005 Jun02-Jun06 2 4 48 1 55
… … … … … … …
Dr. Takahashi will show you the summary of data for young family asteroids.
Scientific purpose Estimating a time scale of Space weathering on asteroid’s surface.
Ms. Nozawa will show you some results tomorrow.
What we will do in 2010 and 2011
1. Asteroid observations (young family asteroids, some Near Earth Asteroids moving slowly)
2. Tutorial of asteroid observation and data analysis
3. Maidanak Users meeting
4. Our budget is not enough for new instrumentation.
5. We keep trying to apply funds.
1st Maidank Users meeting at SNU, Seoul, on June 30, 2009.
Thank you very much for your attention