jeremy winn application engineer new river kinematics philip wilson application engineer new river...
TRANSCRIPT
![Page 1: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/1.jpg)
GD&T Inspection in SpatialAnalyzer
Jeremy WinnApplication Engineer
New River Kinematics
Philip WilsonApplication Engineer
New River Kinematics
![Page 2: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/2.jpg)
GD&T Inspection
Incorporating
Standardized Inspection within SpatialAnalyzer
![Page 3: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/3.jpg)
GD&T Inspection
GD&T “Regular Inspection” Alignments Datum Structure Current Position
Check Specific
Computation Bounding Tol. Zone RMS (root mean square)
Outlier Pts = Part Error User controls rejection rules
Goals: Pass/Fail at Tolerance Is the part good and if not..,
how do I fix it?
![Page 4: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/4.jpg)
GD&T Inspection
1. Defining the Checks
Building Annotations • Tolerance Structure• Nominal designation
GD&T Inspection can be Divided into 2 Distinct Steps
1. Measurement ProcessData Gathering & Association
• Inspection/ inspect scripting• Toolkit or direction Association • or Measurement Plan (MP)
![Page 5: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/5.jpg)
GD&T and CAD Import
![Page 6: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/6.jpg)
GD&T Annotations
![Page 7: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/7.jpg)
GD&T Annotations
• SA Objects/CAD Face
• Datum Assignment
• Tolerance Definition
![Page 8: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/8.jpg)
GD&T Annotations
Datum Annotations:
• SA Objects/CAD Face
![Page 9: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/9.jpg)
Building Annotations
![Page 10: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/10.jpg)
GD&T Annotations
• Annotation View Orientation:
• CAD Faces vs. SA Objects SA Objects (Fit to Points)
![Page 11: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/11.jpg)
GD&T Annotations
Datum and Datum Target Designations• (Hold down A-Z to pick a letter)• Click-point defines leader line anchor point
![Page 12: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/12.jpg)
GD&T Annotations
Feature Checks Designation:
![Page 13: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/13.jpg)
GD&T Annotations
– Form Checks• Datum Independent
– Orientation Checks• Depend on 1 Datum
– Location Checks• Can Include 1-3 Datums • Can Include 1-2 Tiers
Feature Checks Designation:
![Page 14: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/14.jpg)
GD&T Annotations
• Required for Material Modifiers– MMC, LMC
• Dimensional Tolerances– Datum Independent
![Page 15: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/15.jpg)
Building Annotations Demo
![Page 16: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/16.jpg)
GD&T Inspection
1. Defining the Checks
Building Annotations • Tolerance Structure• Nominal designation
GD&T Inspection can be Divided into 2 Distinct Steps
1. Measurement ProcessData Gathering & Association
• Inspection/ inspect scripting• Toolkit or direction Association • or Measurement Plan (MP)
![Page 17: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/17.jpg)
Building Feature Checks
• Tree Structure– Annotations
• Tolerance & check definition
– Datums & Feature Checks1. Link points to annotations
2. Point offset & evaluation control
3. Contain guided inspection controls
![Page 18: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/18.jpg)
Building Feature Checks
![Page 19: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/19.jpg)
GD&T Inspection
Direct Point Association
![Page 20: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/20.jpg)
GD&T Inspection
Guided Inspection• Design• Rehearse• Inspect
![Page 21: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/21.jpg)
Demo- Basic Fit & Link
![Page 22: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/22.jpg)
Check Details
Feature Checks come in 3 Categories:
– Orientation Checks
– Location Checks
– Form Checks
![Page 23: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/23.jpg)
Flatness
Flatness Evaluation Process within SA:1. Two parallel planes are built bounding the
extents of the data.2. These planes are allowed to freely rotate to
establish the minimum distance between them while still containing the data.
![Page 24: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/24.jpg)
Flatness
Standard Inspection (RMS):
![Page 25: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/25.jpg)
Flatness
Flatness Evaluation Process within SA:1. Two parallel planes are built bounding the
extents of the data.2. These planes are allowed to freely rotate to
establish the minimum distance between them while still containing the data.
![Page 26: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/26.jpg)
Cylindricty
Cylindricity Evaluation Process within SA:1. Two coaxial cylinders are built bounding the
extents of the data.2. The cylinders are allowed to freely rotate to
establish the minimum distance between them while still containing the data.
![Page 27: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/27.jpg)
Orientation Checks
Datum
Nominal Angle
Deviation = Distance btw Planes
![Page 28: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/28.jpg)
Surface Profile
Surface Profile Evaluation Process within SA:
1. An inner and outer tolerance boundary is established2. The profile is allowed to rotate based on the datum
constraints to minimize the deviations3. The extent of the max and min deviation is used to
establish the measured profile deviation
![Page 29: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/29.jpg)
GD&T Annotations
Feature Checks Categories:
Cross SectionChecks
![Page 30: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/30.jpg)
GD&T Annotations
Cross Section Checks:
RunoutCross Section
Check
Total RunoutSurface Check
![Page 31: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/31.jpg)
Concentricity
Cross Section Checks:
ConcentricityCross Section
Check
![Page 32: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/32.jpg)
GD&T Annotations
Cross SectionChecks
![Page 33: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/33.jpg)
Datum Alignment
Right- Click Datum Category• Select “Align”
![Page 34: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/34.jpg)
Building Feature Checks
• Cylinder Evaluation Method• Probe Compensation
![Page 35: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/35.jpg)
Datums and Degrees of Freedom• Geometry Type is the Key
Datum Alignment
![Page 36: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/36.jpg)
The number of datums specified and the feature type selected controls the degrees of freedom for the check:
Datum Alignment
• SA Objects/CAD Face• SA Offset object
![Page 37: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/37.jpg)
Demo- Basic Fit & Link
![Page 38: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/38.jpg)
Building Feature Checks
Inspection Controls
Evaluation Method
![Page 39: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/39.jpg)
Building Feature Checks
• Cylinder Evaluation Method
![Page 40: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/40.jpg)
Building Feature Checks
• Cylinder Evaluation Method
![Page 41: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/41.jpg)
Building Feature Checks
• Cylinder Evaluation Method
![Page 42: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/42.jpg)
Building Feature Checks
• Cylinder Evaluation Method
![Page 43: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/43.jpg)
Composite True Position
Composite Checks:
![Page 44: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/44.jpg)
Automatic Point Association
GD&T Inspection
• Proximity Filter
• Based on Initial Alignment
![Page 45: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/45.jpg)
Automatic Point Association
GD&T Inspection
![Page 46: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/46.jpg)
Automatic Point Association
GD&T Inspection
![Page 47: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/47.jpg)
Reporting
![Page 48: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/48.jpg)
Reporting
Summary Table• Fit Transform• Datum Statistics
Details Table• Point Deviations
![Page 49: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/49.jpg)
Reporting
Vectors for Visualization:• Specific Alignment• DoF Understanding
![Page 50: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/50.jpg)
Reporting
![Page 51: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/51.jpg)
Reporting
![Page 52: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/52.jpg)
Evaluations Tools
![Page 53: Jeremy Winn Application Engineer New River Kinematics Philip Wilson Application Engineer New River Kinematics](https://reader038.vdocuments.net/reader038/viewer/2022103005/56649d355503460f94a0d1ac/html5/thumbnails/53.jpg)
Thank You