33
S.No. Project Auction Date Bidder Name Destination/ Address Allotment Date Loading Date Status of Loading of Rakes 1 Jhingurda 27.02.13 K R PULP & PAPERS LTD. Roza 02.04.13 08.04.13 loaded 2 Jhingurda 27.02.13 hindalco industries limited Renukoot, UP 03.04.13 09.04.13 loaded 3 Jhingurda 27.02.13 NTPC LTD SIPAT Gatora Railway Station, Near Rewa, MP 04.04.13 11.04.13 loaded 4 Jhingurda 27.02.13 NTPC LTD SIPAT Gatora Railway Station, Near Rewa, MP 05.04.13 13.04.13 loaded 5 Jhingurda 27.02.13 NTPC LTD SIPAT Gatora Railway Station, Near Rewa, MP 06.04.13 14.04.13 loaded 6 Jhingurda 22.03.13 Shri Vandana Trading Corporation Jukehi, MP 01.05.13 15.05.13 loaded 7 Jhingurda 22.03.13 HINDALCO INDUSTRIES LIMITED MAHAN ALUMINIUM PROJECT Hindalco Mahan Plant (SGRL Sdg) 02.05.13 17.05.13 loaded 8 Jhingurda 22.03.13 NTPC LTD DADRI NTPC Dadari, Sdg 03.05.13 19.05.13 loaded 9 Jhingurda 22.03.13 NTPC LTD DADRI NTPC Dadari, Sdg 04.05.13 21.05.13 loaded 10 Jhingurda 22.03.13 NTPC LTD DADRI NTPC Dadari, Sdg 05.05.13 23.05.13 loaded 11 Jhingurda 25.04.13 Sachin And Brothers Gwalior 07.06.13 09.06.13 loaded 12 Jhingurda 25.04.13 K R PULP & PAPERS LTD. Roza 12.06.13 16.06.13 loaded 13 Jhingurda 25.04.13 Poddar Minerals Jukehi, MP 13.06.13 14.06.13 loaded 14 Jhingurda 25.04.13 HINDALCO INDUSTRIES LIMITED MAHAN ALUMINIUM PROJECT Hindalco Mahan Plant (SGRL Sdg) 14.06.13 15.06.13 loaded 15 Jhingurda 25.04.13 HINDALCO INDUSTRIES LIMITED MAHAN ALUMINIUM PROJECT Hindalco Mahan Plant (SGRL Sdg) 15.06.13 17.06.13 loaded 16 Jhingurda 25.04.13 HINDALCO INDUSTRIES LIMITED MAHAN ALUMINIUM PROJECT Hindalco Mahan Plant (SGRL Sdg) 16.06.13 18.06.13 loaded 17 Jhingurda 25.04.13 Jubilant Life Sciences Jubilant Org. Ltd, Pvt Sdg, served By Gajrola Stn, UP 17.06.13 20.06.13 loaded 18 Jhingurda 22.05.13 GODAVARI COMMODITIES LIMITED katra 28.06.13 04.07.13 Loaded 19 Jhingurda 22.05.13 VARDHMAN FABRICS (POWER DIVN.) Vardhman Fabrics Pvt sdg, seved by Budhi Stn., MP 29.06.13 05.07.13 Loaded 20 Jhingurda 22.05.13 shri vandana trading corporation Jukehi, MP 30.06.13 07.07.13 Loaded 21 Jhingurda 22.05.13 NTPC LTD DADRI NTPC Dadari, Sdg 01.07.13 10.07.13 Loaded 22 Jhingurda 22.05.13 NTPC LTD DADRI NTPC Dadari, Sdg 02.07.13 13.07.13 Loaded 23 Jhingurda 26.06.13 Aditya Birla Chemicals (India) Ltd. Renukoot, UP 25.07.13 26.07.13 Loaded 24 Jhingurda 26.06.13 Chandra Prabhu International Ltd Ayodhya 28.07.13 30.07.13 Loaded 25 Jhingurda 26.06.13 Birla Corporation Ltd BCSW siding, satna 29.07.13 01.08.13 Loaded 26 Jhingurda 26.06.13 NTPC Ltd Dadri NTPC Dadari, Sdg 06.08.13 07.08.13 Loaded 27 Jhingurda 26.06.13 NTPC Ltd Dadri NTPC Dadari, Sdg 07.08.13 09.08.13 Loaded 28 Jhingurda 24.07.13 Jaiprakash Associates Ltd.(Unit:Jaypee Sidhi Cement Plant) Beohari 23.08.13 28.08.13 Loaded 29 Jhingurda 24.07.13 BIRLA CORPORATION LTD UNIT.BIRLA CEMENT WORKS Chanderiya 24.08.13 29.08.13 Loaded 30 Jhingurda 24.07.13 REAL CONERGY INDIA PRIVATE LIMITED Jhingurda- Status of loading of rakes a/c e-Auction (Auction-wise Seniority) as on 17.10.2017 (till midnight) Jhingurda Project Cancelled

Upload: vuongdung

Post on 26-Mar-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Jhingurda- Status of loading of rakes a/c e-Auction ... · PDF file3 Jhingurda 27.02.13 NTPC LTD SIPAT Gatora Railway Station, Near Rewa, MP 04.04.13 11.04.13 loaded 4 Jhingurda 27.02.13

S.No. ProjectAuction

DateBidder Name

Destination/

Address

Allotment

Date

Loading

Date

Status of

Loading of

Rakes

1 Jhingurda 27.02.13 K R PULP & PAPERS LTD. Roza 02.04.13 08.04.13 loaded

2 Jhingurda 27.02.13 hindalco industries limited Renukoot, UP 03.04.13 09.04.13 loaded

3 Jhingurda 27.02.13 NTPC LTD SIPAT

Gatora Railway

Station, Near Rewa,

MP

04.04.13 11.04.13 loaded

4 Jhingurda 27.02.13 NTPC LTD SIPAT

Gatora Railway

Station, Near Rewa,

MP

05.04.13 13.04.13 loaded

5 Jhingurda 27.02.13 NTPC LTD SIPAT

Gatora Railway

Station, Near Rewa,

MP

06.04.13 14.04.13 loaded

6 Jhingurda 22.03.13 Shri Vandana Trading Corporation Jukehi, MP 01.05.13 15.05.13 loaded

7 Jhingurda 22.03.13HINDALCO INDUSTRIES LIMITED

MAHAN ALUMINIUM PROJECT

Hindalco Mahan

Plant (SGRL Sdg)02.05.13 17.05.13 loaded

8 Jhingurda 22.03.13 NTPC LTD DADRI NTPC Dadari, Sdg 03.05.13 19.05.13 loaded9 Jhingurda 22.03.13 NTPC LTD DADRI NTPC Dadari, Sdg 04.05.13 21.05.13 loaded

10 Jhingurda 22.03.13 NTPC LTD DADRI NTPC Dadari, Sdg 05.05.13 23.05.13 loaded

11 Jhingurda 25.04.13 Sachin And Brothers Gwalior 07.06.13 09.06.13 loaded12 Jhingurda 25.04.13 K R PULP & PAPERS LTD. Roza 12.06.13 16.06.13 loaded13 Jhingurda 25.04.13 Poddar Minerals Jukehi, MP 13.06.13 14.06.13 loaded

14 Jhingurda 25.04.13HINDALCO INDUSTRIES LIMITED

MAHAN ALUMINIUM PROJECT

Hindalco Mahan

Plant (SGRL Sdg)14.06.13 15.06.13 loaded

15 Jhingurda 25.04.13HINDALCO INDUSTRIES LIMITED

MAHAN ALUMINIUM PROJECT

Hindalco Mahan

Plant (SGRL Sdg)15.06.13 17.06.13 loaded

16 Jhingurda 25.04.13HINDALCO INDUSTRIES LIMITED

MAHAN ALUMINIUM PROJECT

Hindalco Mahan

Plant (SGRL Sdg)16.06.13 18.06.13 loaded

17 Jhingurda 25.04.13 Jubilant Life Sciences

Jubilant Org. Ltd, Pvt

Sdg, served By

Gajrola Stn, UP

17.06.13 20.06.13 loaded

18 Jhingurda 22.05.13GODAVARI COMMODITIES

LIMITEDkatra 28.06.13 04.07.13 Loaded

19 Jhingurda 22.05.13VARDHMAN FABRICS (POWER

DIVN.)

Vardhman Fabrics

Pvt sdg, seved by

Budhi Stn., MP

29.06.13 05.07.13 Loaded

20 Jhingurda 22.05.13 shri vandana trading corporation Jukehi, MP 30.06.13 07.07.13 Loaded

21 Jhingurda 22.05.13 NTPC LTD DADRI NTPC Dadari, Sdg 01.07.13 10.07.13 Loaded

22 Jhingurda 22.05.13 NTPC LTD DADRI NTPC Dadari, Sdg 02.07.13 13.07.13 Loaded

23 Jhingurda 26.06.13 Aditya Birla Chemicals (India) Ltd. Renukoot, UP 25.07.13 26.07.13 Loaded

24 Jhingurda 26.06.13 Chandra Prabhu International Ltd Ayodhya 28.07.13 30.07.13 Loaded

25 Jhingurda 26.06.13 Birla Corporation Ltd BCSW siding, satna 29.07.13 01.08.13 Loaded

26 Jhingurda 26.06.13 NTPC Ltd Dadri NTPC Dadari, Sdg 06.08.13 07.08.13 Loaded

27 Jhingurda 26.06.13 NTPC Ltd Dadri NTPC Dadari, Sdg 07.08.13 09.08.13 Loaded

28 Jhingurda 24.07.13

Jaiprakash Associates

Ltd.(Unit:Jaypee Sidhi Cement

Plant)

Beohari 23.08.13 28.08.13 Loaded

29 Jhingurda 24.07.13BIRLA CORPORATION LTD

UNIT.BIRLA CEMENT WORKSChanderiya 24.08.13 29.08.13 Loaded

30 Jhingurda 24.07.13REAL CONERGY INDIA PRIVATE

LIMITED

Jhingurda- Status of loading of rakes a/c e-Auction (Auction-wise Seniority) as on 17.10.2017 (till midnight)

Jhingurda Project

Cancelled

Page 2: Jhingurda- Status of loading of rakes a/c e-Auction ... · PDF file3 Jhingurda 27.02.13 NTPC LTD SIPAT Gatora Railway Station, Near Rewa, MP 04.04.13 11.04.13 loaded 4 Jhingurda 27.02.13

S.No. ProjectAuction

DateBidder Name

Destination/

Address

Allotment

Date

Loading

Date

Status of

Loading of

Rakes

Jhingurda- Status of loading of rakes a/c e-Auction (Auction-wise Seniority) as on 17.10.2017 (till midnight)

Jhingurda Project

31 Jhingurda 24.07.13Jaiprakash Associates

Ltd.(Unit:Chunar Cement Factory)

Jaiprakash Ass. Ltd.

Cement Sdg, Chunar 26.08.13 30.08.13 Loaded

32 Jhingurda 24.07.13Jaiprakash Associates

Ltd.(Unit:Chunar Cement Factory)

Jaiprakash Ass. Ltd.

Cement Sdg, Chunar28.08.13 31.08.13 Loaded

33 Jhingurda 23.08.13AGARWALCOALCORPORATIONPV

TLTDGarhmuktesar 17.09.13 21.09.13 Loaded

34 Jhingurda 23.08.13 NTPC LTD DADRI NTPC Dadari, Sdg 21.09.13 23.09.13 Loaded35 Jhingurda 23.08.13 NTPC LTD DADRI NTPC Dadari, Sdg 24.09.13 25.09.13 Loaded36 Jhingurda 23.08.13 NTPC LTD DADRI NTPC Dadari, Sdg 26.09.13 27.09.13 Loaded37 Jhingurda 23.08.13 NTPC LTD DADRI NTPC Dadari, Sdg 27.09.13 29.09.13 Loaded38 Jhingurda 23.08.13 NTPC LTD DADRI NTPC Dadari, Sdg 28.09.13 30.09.13 Loaded

39 Jhingurda 23.08.13 NTPC LTD DADRI NTPC Dadari, Sdg 30.09.13 01.10.13 Loaded

40 Jhingurda 23.09.13 NTPC LTD DADRI NTPC Dadari, Sdg 24.10.13 25.10.13 Loaded41 Jhingurda 23.09.13 NTPC LTD DADRI NTPC Dadari, Sdg 25.10.13 26.10.13 Loaded42 Jhingurda 23.09.13 NTPC LTD DADRI NTPC Dadari, Sdg 27.10.13 28.10.13 Loaded43 Jhingurda 23.09.13 NTPC LTD DADRI NTPC Dadari, Sdg 28.10.13 30.10.13 Loaded44 Jhingurda 23.09.13 NTPC LTD DADRI NTPC Dadari, Sdg 29.10.13 31.10.13 Loaded45 Jhingurda 23.09.13 NTPC LTD DADRI NTPC Dadari, Sdg 30.10.13 01.11.13 Loaded46 Jhingurda 23.09.13 NTPC LTD DADRI NTPC Dadari, Sdg 31.10.13 02.11.13 Loaded47 Jhingurda 23.09.13 NTPC LTD DADRI NTPC Dadari, Sdg 01.11.13 03.11.13 Loaded48 Jhingurda 23.09.13 NTPC LTD DADRI NTPC Dadari, Sdg 02.11.13 04.11.13 Loaded

49 Jhingurda 23.09.13 NTPC LTD DADRI NTPC Dadari, Sdg 03.11.13 06.11.13 Loaded

50 Jhingurda 23.10.13GODAVARI COMMODITIES

LIMITEDSalaibanwa 15.11.13 19.11.13 Loaded

51 Jhingurda 23.10.13GODAVARI COMMODITIES

LIMITEDSalaibanwa 16.11.13 20.11.13 Loaded

52 Jhingurda 23.10.13 NTPC LTD DADRI NTPC Dadari, Sdg 19.11.13 23.11.13 Loaded53 Jhingurda 23.10.13 NTPC LTD DADRI NTPC Dadari, Sdg 20.11.13 24.11.13 Loaded54 Jhingurda 23.10.13 NTPC LTD DADRI NTPC Dadari, Sdg 21.11.13 26.11.13 Loaded55 Jhingurda 23.10.13 NTPC LTD DADRI NTPC Dadari, Sdg 22.11.13 27.11.13 Loaded56 Jhingurda 23.10.13 NTPC LTD DADRI NTPC Dadari, Sdg 23.11.13 28.11.13 Loaded57 Jhingurda 23.10.13 NTPC LTD DADRI NTPC Dadari, Sdg 24.11.13 29.11.13 Loaded58 Jhingurda 23.10.13 NTPC LTD DADRI NTPC Dadari, Sdg 25.11.13 30.11.13 Loaded

59 Jhingurda 23.10.13 NTPC LTD DADRI NTPC Dadari, Sdg 26.11.13 03.12.13 Loaded

60 Jhingurda 26.11.13SHREE ENTERPRISES COAL SALES

PVT LTDAyodhya 17.12.13 18.12.13 Loaded

61 Jhingurda 26.11.13HINDALCO INDUSTRIES LIMITED

MAHAN ALUMINIUM PROJECTSingrauli 18.12.13 21.12.13 Loaded

62 Jhingurda 26.11.13 GODAVARI COMMODITIES LTD. Ayodhya 19.12.13 25.12.13 Loaded63 Jhingurda 26.11.13 SBC MINERALS (P) LTD ROZA 20.12.13 26.12.13 Loaded64 Jhingurda 26.11.13 NTPC LTD DADRI NTPC Dadari, Sdg 21.12.13 24.12.13 Loaded65 Jhingurda 26.11.13 NTPC LTD DADRI NTPC Dadari, Sdg 22.12.13 27.12.13 Loaded66 Jhingurda 26.11.13 NTPC LTD DADRI NTPC Dadari, Sdg 23.12.13 28.12.13 Loaded67 Jhingurda 26.11.13 NTPC LTD DADRI NTPC Dadari, Sdg 24.12.13 29.12.13 Loaded68 Jhingurda 26.11.13 NTPC LTD DADRI NTPC Dadari, Sdg 25.12.13 31.12.13 Loaded

69 Jhingurda 26.11.13 NTPC LTD DADRI NTPC Dadari, Sdg 26.12.13 03.12.13 Loaded

70 Jhingurda 19.12.13 NTPC LTD SIPATGatora Railway

Station12.01.14 18.01.14 Loaded

71 Jhingurda 19.12.13 NTPC LTD SIPAT Gatora Railway Stn 13.01.14 20.01.14 Loaded

72 Jhingurda 19.12.13 NTPC LTD SIPAT Gatora Railway Stn 14.01.14 22.01.14 Loaded

73 Jhingurda 19.12.13 NTPC LTD SIPAT Gatora Railway Stn 15.01.14 24.01.14 Loaded

74 Jhingurda 19.12.13 NTPC LTD SIPAT Gatora Railway Stn 16.01.14 25.01.14 Loaded

Page 3: Jhingurda- Status of loading of rakes a/c e-Auction ... · PDF file3 Jhingurda 27.02.13 NTPC LTD SIPAT Gatora Railway Station, Near Rewa, MP 04.04.13 11.04.13 loaded 4 Jhingurda 27.02.13

S.No. ProjectAuction

DateBidder Name

Destination/

Address

Allotment

Date

Loading

Date

Status of

Loading of

Rakes

Jhingurda- Status of loading of rakes a/c e-Auction (Auction-wise Seniority) as on 17.10.2017 (till midnight)

Jhingurda Project

75 Jhingurda 19.12.13 NTPC LTD SIPAT Gatora Railway Stn 17.01.14 26.01.14 Loaded

76 Jhingurda 19.12.13 NTPC LTD SIPAT Gatora Railway Stn 19.01.14 27.01.14 Loaded

77 Jhingurda 19.12.13 NTPC LTD SIPAT Gatora Railway Stn 20.01.14 28.01.14 Loaded

78 Jhingurda 19.12.13 NTPC LTD SIPAT Gatora Railway Stn 21.01.14 29.01.14 Loaded

79 Jhingurda 19.12.13 NTPC LTD SIPAT Gatora Railway Stn 22.01.14 30.01.14 Loaded

80 Jhingurda 19.12.13 NTPC LTD SIPAT Gatora Railway Stn 23.01.14 31.01.14 Loaded

81 Jhingurda 19.12.13 NTPC LTD SIPAT Gatora Railway Stn 28.01.14 01.02.14 Loaded

82 Jhingurda 19.12.13 NTPC LTD SIPAT Gatora Railway Stn. 29.01.14 02.02.14 Loaded

83 Jhingurda 27.01.14 ESSAR POWER M.P. LIMITED Mahdeiya 13.02.14 13.02.14 Loaded84 Jhingurda 27.01.14 ESSAR POWER M.P. LIMITED Mahdeiya 13.02.14 14.02.14 Loaded85 Jhingurda 27.01.14 ESSAR POWER M.P. LIMITED Mahdeiya 14.02.14 15.02.14 Loaded

86 Jhingurda 27.01.14 Maihar CementMSSG Siding,

Maihar Cement15.02.14 16.02.14 Loaded

87 Jhingurda 27.01.14 Maihar CementMSSG Siding,

Maihar Cement16.02.14 17.02.14 Loaded

88 Jhingurda 27.01.14 Maihar CementMSSG Siding,

Maihar Cement17.02.14 19.02.14 Loaded

89 Jhingurda 27.01.14NTPC Ltd / BARH SUPER THERMAL

POWER PROJECTBarh Stn. 18.02.14 20.02.14 Loaded

90 Jhingurda 27.01.14NTPC Ltd / BARH SUPER THERMAL

POWER PROJECTBarh Stn. 19.02.14 01.03.14 Loaded

91 Jhingurda 27.01.14NTPC Ltd / BARH SUPER THERMAL

POWER PROJECTBarh Stn. 20.02.14 03.03.14 Loaded

92 Jhingurda 27.01.14NTPC Ltd / BARH SUPER THERMAL

POWER PROJECTBarh Stn. 21.02.14 03.03.14 Loaded

93 Jhingurda 27.01.14NTPC Ltd / BARH SUPER THERMAL

POWER PROJECTBarh Stn. 22.02.14 16.03.14 Loaded

94 Jhingurda 27.01.14NTPC Ltd / BARH SUPER THERMAL

POWER PROJECTBarh Stn. 26.02.14 18.03.14 Loaded

95 Jhingurda 27.01.14NTPC Ltd / BARH SUPER THERMAL

POWER PROJECTBarh Stn. 27.02.14 19.03.14 Loaded

96 Jhingurda 27.01.14NTPC Ltd / BARH SUPER THERMAL

POWER PROJECTBarh Stn. 04.03.14 20.03.14 Loaded

97 Jhingurda 27.01.14NTPC Ltd / BARH SUPER THERMAL

POWER PROJECTBarh Stn. 15.03.14 21.03.14 Loaded

98 Jhingurda 20.02.14ADANI POWER RAJASTHAN

LIMITED

Adani Power Raj. Ltd

sdg served by

Salpura Stn

21.03.14 27.03.14 Loaded

99 Jhingurda 20.02.14ADANI POWER RAJASTHAN

LIMITED

Adani Power Raj. Ltd

sdg served by

Salpura Stn

22.03.14 28.03.14 Loaded

100 Jhingurda 20.02.14ADANI POWER RAJASTHAN

LIMITED

Adani Power Raj. Ltd

sdg served by

Salpura Stn

26.03.14 29.03.14 Loaded

101 Jhingurda 20.02.14ADANI POWER RAJASTHAN

LIMITED

Adani Power Raj. Ltd

sdg served by

Salpura Stn

27.03.14 31.03.14 Loaded

102 Jhingurda 20.02.14ADANI POWER RAJASTHAN

LIMITED

Adani Power Raj. Ltd

sdg served by

Salpura Stn

28.03.14 01.04.14 Loaded

103 Jhingurda 20.02.14 NTPC LTD DADRI NTPC Dadari, Sdg 29.03.14 02.04.14 Loaded

Page 4: Jhingurda- Status of loading of rakes a/c e-Auction ... · PDF file3 Jhingurda 27.02.13 NTPC LTD SIPAT Gatora Railway Station, Near Rewa, MP 04.04.13 11.04.13 loaded 4 Jhingurda 27.02.13

S.No. ProjectAuction

DateBidder Name

Destination/

Address

Allotment

Date

Loading

Date

Status of

Loading of

Rakes

Jhingurda- Status of loading of rakes a/c e-Auction (Auction-wise Seniority) as on 17.10.2017 (till midnight)

Jhingurda Project

104 Jhingurda 20.02.14 NTPC LTD DADRI NTPC Dadari, Sdg 30.03.14 03.04.14 Loaded105 Jhingurda 20.02.14 NTPC LTD DADRI NTPC Dadari, Sdg 31.03.14 04.04.14 Loaded106 Jhingurda 20.02.14 NTPC LTD DADRI NTPC Dadari, Sdg 01.04.14 05.04.14 Loaded107 Jhingurda 20.02.14 NTPC LTD DADRI NTPC Dadari, Sdg 02.04.14 08.04.14 Loaded108 Jhingurda 20.02.14 NTPC LTD DADRI NTPC Dadari, Sdg 03.04.14 09.04.14 Loaded109 Jhingurda 20.02.14 NTPC LTD DADRI NTPC Dadari, Sdg 07.04.14 11.04.14 Loaded110 Jhingurda 20.02.14 NTPC LTD DADRI NTPC Dadari, Sdg 08.04.14 12.04.14 Loaded111 Jhingurda 20.02.14 NTPC LTD DADRI NTPC Dadari, Sdg 09.04.14 14.04.14 Loaded

112 Jhingurda 20.02.14 NTPC LTD DADRI NTPC Dadari, Sdg 10.04.14 15.04.14 Loaded

113 Jhingurda 21.03.14ADANI POWER RAJASTHAN

LIMITED

Adani Power Raj. Ltd

sdg served by

Salpura Stn

22.04.14 27.04.14 Loaded

114 Jhingurda 21.03.14ADANI POWER RAJASTHAN

LIMITED

Adani Power Raj. Ltd

sdg served by

Salpura Stn

23.04.14 29.04.14 Loaded

115 Jhingurda 21.03.14NTPC Ltd / BARH SUPER THERMAL

POWER PROJECTBarh Stn. 24.04.14 30.04.14 Loaded

116 Jhingurda 21.03.14NTPC Ltd / BARH SUPER THERMAL

POWER PROJECTBarh Stn. 25.04.14 01.05.14 Loaded

117 Jhingurda 21.03.14NTPC Ltd / BARH SUPER THERMAL

POWER PROJECTBarh Stn. 26.04.14 04.05.14 Loaded

118 Jhingurda 21.03.14NTPC Ltd / BARH SUPER THERMAL

POWER PROJECTBarh Stn. 27.04.14 06.05.14 Loaded

119 Jhingurda 21.03.14NTPC Ltd / BARH SUPER THERMAL

POWER PROJECTBarh Stn. 29.04.14 08.05.14 Loaded

120 Jhingurda 21.03.14NTPC Ltd / BARH SUPER THERMAL

POWER PROJECTBarh Stn. 02.05.14 15.06.14 Loaded

121 Jhingurda 21.03.14NTPC Ltd / BARH SUPER THERMAL

POWER PROJECTBarh Stn. 03.05.14 21.06.14 Loaded

122 Jhingurda 21.03.14NTPC Ltd / BARH SUPER THERMAL

POWER PROJECTBarh Stn. 06.05.14 25.06.14 Loaded

123 Jhingurda 21.03.14NTPC Ltd / BARH SUPER THERMAL

POWER PROJECTBarh Stn. 07.05.14 27.06.14 Loaded

124 Jhingurda 21.03.14NTPC Ltd / BARH SUPER THERMAL

POWER PROJECTBarh Stn. 09.05.14 01.07.14 Loaded

125 Jhingurda 21.03.14NTPC Ltd / BARH SUPER THERMAL

POWER PROJECTBarh Stn. 11.05.14 03.07.14 Loaded

126 Jhingurda 21.03.14NTPC Ltd / BARH SUPER THERMAL

POWER PROJECTBarh Stn. 29.05.14 05.07.14 Loaded

127 Jhingurda 21.03.14NTPC Ltd / BARH SUPER THERMAL

POWER PROJECTBarh Stn. 30.05.14 10.07.14 Loaded

128 Jhingurda 21.03.14NTPC Ltd / BARH SUPER THERMAL

POWER PROJECTBarh Stn. 30.05.14 13.07.14 Loaded

129 Jhingurda 21.03.14NTPC Ltd / BARH SUPER THERMAL

POWER PROJECTBarh Stn. 30.05.14 14.07.14 Loaded

130 Jhingurda 21.03.14NTPC Ltd / BARH SUPER THERMAL

POWER PROJECTBarh Stn. 30.05.14 17.07.14 Loaded

131 Jhingurda 15.04.14 SBC MINERALS (P) LTD Garhmuktesar 19.06.14 20.06.14 Loaded

132 Jhingurda 15.04.14ABHINAV STEELS & POWER

LIMITEDNaini 20.06.14 30.06.14 Loaded

133 Jhingurda 15.04.14 K R PULP & PAPERS LTD. ROZA 21.06.14 07.07.14 Loaded134 Jhingurda 15.04.14 NTPC Ltd Barh Stn. 05.07.14 24.07.14 Loaded135 Jhingurda 15.04.14 NTPC Ltd Barh Stn. 08.07.14 25.07.14 Loaded136 Jhingurda 15.04.14 NTPC Ltd Barh Stn. 16.07.14 28.07.14 Loaded137 Jhingurda 15.04.14 NTPC Ltd Barh Stn. 21.07.14 29.07.14 Loaded138 Jhingurda 15.04.14 NTPC Ltd Barh Stn. 25.07.14 07.08.14 Loaded139 Jhingurda 15.04.14 NTPC Ltd Barh Stn. 25.07.14 08.08.14 Loaded140 Jhingurda 15.04.14 NTPC Ltd Barh Stn. 25.07.14 09.08.14 Loaded141 Jhingurda 15.04.14 NTPC Ltd Barh Stn. 26.07.14 15.08.14 Loaded

Page 5: Jhingurda- Status of loading of rakes a/c e-Auction ... · PDF file3 Jhingurda 27.02.13 NTPC LTD SIPAT Gatora Railway Station, Near Rewa, MP 04.04.13 11.04.13 loaded 4 Jhingurda 27.02.13

S.No. ProjectAuction

DateBidder Name

Destination/

Address

Allotment

Date

Loading

Date

Status of

Loading of

Rakes

Jhingurda- Status of loading of rakes a/c e-Auction (Auction-wise Seniority) as on 17.10.2017 (till midnight)

Jhingurda Project

142 Jhingurda 15.04.14 NTPC Ltd Barh Stn. 26.07.14 17.08.14 Loaded143 Jhingurda 15.04.14 NTPC Ltd Barh Stn. 27.07.14 19.08.14 Loaded144 Jhingurda 15.04.14 ESSAR POWER M. P. LIMITED Mahdeiya 27.070.14 11.08.14 Loaded

145 Jhingurda 15.04.14 ESSAR POWER M. P. LIMITED Mahdeiya 27.07.14 13.08.14 Loaded

146 Jhingurda 12.08.14SHREE ENTERPRISES COAL SALES

PVT LTDChandigarh 09.09.14 10.09.14 Loaded

147 Jhingurda 12.08.14SHREE ENTERPRISES COAL SALES

PVT LTDAyodhya 10.09.14 11.09.14 Loaded

148 Jhingurda 12.08.14SHREE ENTERPRISES COAL SALES

PVT LTDRevised to Jagadhri 11.09.14 12.09.14 Loaded

149 Jhingurda 12.08.14 Godavari Commodities Ltd. Revised to Ayodhya 12.09.14 13.09.14 Loaded

150 Jhingurda 12.08.14 Godavari Commodities Ltd. Revised to Ayodhya 13.09.14 15.09.14 Loaded

151 Jhingurda 12.08.14 R. S. Fuel Pvt. Ltd. Mahdeiya 14.09.14 16.09.14 Loaded152 Jhingurda 12.08.14 R. S. Fuel Pvt. Ltd. Mahdeiya 15.09.14 22.09.14 Loaded153 Jhingurda 12.08.14 K R PULP & PAPERS LTD. ROZA 16.09.14 25.09.14 Loaded154 Jhingurda 12.08.14 Arihant Coal Corporation Gwalior 17.09.14 26.09.14 Loaded

155 Jhingurda 12.08.14 Mahendra Sponge And Power Ltd.

Revised to Raipur

handling &

infrastructure Pvt

Ltd

18.09.14 29.09.14 Loaded

156 Jhingurda 12.08.14 Maihar CementMSSG Siding,

Maihar Cement28.09.14 04.10.14 Loaded

157 Jhingurda 12.08.14 Ajay Trading Co. Revised To Jagadhri 28.09.14 05.10.14 Loaded

158 Jhingurda 12.08.14SHREE ENTERPRISES COAL SALES

PVT LTD

Revised to Roza

Goods Shed29.09.14 06.10.14 Loaded

159 Jhingurda 12.08.14Hindalco Indusrties Ltd., Mahan

Aluminimum ProjectSingrauli 29.09.14 07.10.14 Loaded

160 Jhingurda 12.08.14Hindalco Indusrties Ltd., Mahan

Aluminimum ProjectSingrauli 29.09.14 17.10.14 Loaded

161 Jhingurda 16.10.14 AJAY TRADING CO. katra 20.11.14 26.11.14 Loaded162 Jhingurda 16.10.14 AJAY TRADING CO. Roza 20.11.14 27.11.14 Loaded163 Jhingurda 16.10.14 AJAY TRADING CO. Chandigarh 20.11.14 30.11.14 Loaded

164 Jhingurda 16.10.14COALMAN LOGISTICS (INDIA)

PRIVATE LIMITEDTilda 21.11.14

165 Jhingurda 16.10.14SHREE ENTERPRISES C.S. PVT LTD

Chandigarh 24.11.14 01.12.14 Loaded

166 Jhingurda 16.10.14SHREE ENTERPRISES C.S. PVT LTD

Katra 25.11.14 03.12.14 Loaded

167 Jhingurda 16.10.14SHREE ENTERPRISES C.S. PVT LTD

Katra 26.11.14 05.12..14 Loaded

168 Jhingurda 16.10.14SHREE ENTERPRISES C.S. PVT LTD

Ayodhya 26.11.14 06.12.14 Loaded

169 Jhingurda 16.10.14 R.S.FUEL PVT LTD Katra 26.11.14 07.12.14 Loaded170 Jhingurda 16.10.14 R.S.FUEL PVT LTD Changed to Boehari 27.11.14 09.12.14 Loaded171 Jhingurda 16.10.14 R.S.FUEL PVT LTD Katra 2911.14172 Jhingurda 16.10.14 R.S.FUEL PVT LTD Katra 30.11.14173 Jhingurda 16.10.14 R.S.FUEL PVT LTD Katra 03.12.14174 Jhingurda 16.10.14 R.S.FUEL PVT LTD Katra 03.12.14

175 Jhingurda 16.10.14 R.S.FUEL PVT LTD Katra 03.12.14

176 Jhingurda 17.11.14 Gallantt Ispat LimitedM/s gallantt ispat

ltd, siding,sahjanwa24.12.14 25.12.14 Loaded

177 Jhingurda 17.11.14 MITTAL TRADE LINK PVT.LTD Beohari 24.12.14 26.12.14 Loaded

Rake cancelled by

customer

Rake cancelled by

customer

Page 6: Jhingurda- Status of loading of rakes a/c e-Auction ... · PDF file3 Jhingurda 27.02.13 NTPC LTD SIPAT Gatora Railway Station, Near Rewa, MP 04.04.13 11.04.13 loaded 4 Jhingurda 27.02.13

S.No. ProjectAuction

DateBidder Name

Destination/

Address

Allotment

Date

Loading

Date

Status of

Loading of

Rakes

Jhingurda- Status of loading of rakes a/c e-Auction (Auction-wise Seniority) as on 17.10.2017 (till midnight)

Jhingurda Project

178 Jhingurda 17.11.14HINDALCO INDUSTRIES LIMITED

MAHAN ALUMINIUM PROJECTSingrauli 25.12.14 27.12.14 Loaded

179 Jhingurda 17.11.14HINDALCO INDUSTRIES LIMITED

MAHAN ALUMINIUM PROJECTSingrauli 25.12.14 29.12.14 Loaded

180 Jhingurda 17.11.14HINDALCO INDUSTRIES LIMITED

MAHAN ALUMINIUM PROJECTSingrauli 26.12.14 30.12.14 Loaded

181 Jhingurda 17.11.14 K R PULP & PAPERS LTD. Roza 26.12.14 03.01.15 Loaded182 Jhingurda 17.11.14 K R PULP & PAPERS LTD. Roza 28.12.14 04.01.15 Loaded

183 Jhingurda 17.11.14SHREE ENTERPRISES COAL SALES

PVT LTDAyodhya 29.12.14 05.01.15 Loaded

184 Jhingurda 17.11.14Paras Power and Coal

Benefication LtdMahdeiya 29.12.14 09.01.15 Loaded

185 Jhingurda 17.11.14 R.S.FUEL PVT LTD Katra 30.12.14. 08.01.15 Loaded186 Jhingurda 17.11.14 R.S.FUEL PVT LTD Katra 01.01.15 10.01.15 Loaded

187 Jhingurda 17.11.14 Aravali Power Company Pvt. Ltd

INDIRA GANDHI

SUPER THERMAL

POWER PROJECT

SERVED BY

SUDHARANA

01.01.15 11.01.15 Loaded

188 Jhingurda 17.11.14 Aravali Power Company Pvt. Ltd

INDIRA GANDHI

SUPER THERMAL

POWER PROJECT

SERVED BY

SUDHARANA

01.01.15 12.01.15 Loaded

189 Jhingurda 17.11.14 Aravali Power Company Pvt. Ltd

INDIRA GANDHI

SUPER THERMAL

POWER PROJECT

SERVED BY

SUDHARANA

01.01.15 17.01.15 Loaded

190 Jhingurda 17.11.14 Aravali Power Company Pvt. Ltd

INDIRA GANDHI

SUPER THERMAL

POWER PROJECT

SERVED BY

SUDHARANA

01.01.15 19.01.15 Loaded

191 Jhingurda 19.01.15 R.S.FUEL PVT LTD BEOHARI 07.02.15 11.02.15 Loaded192 Jhingurda 19.01.15 R.S.FUEL PVT LTD BOEHARI 07.02.15 12.02.15 Loaded193 Jhingurda 19.01.15 SBC MINERALS (P) LTD BOEHARI 08.02.15 15.02.15 Loaded194 Jhingurda 19.01.15 SBC MINERALS (P) LTD AYODHYA 08.02.15 16.02.15 Loaded195 Jhingurda 19.01.15 Ajay Trading Co. BEOHARI 12.02.15 21.02.15 Loaded

196 Jhingurda 19.01.15Mahakaleshwar Mines & Minerals

Private LimitedJukehi, MP 12.02.15 22.02.15 Loaded

197 Jhingurda 19.01.15Mahakaleshwar Mines & Minerals

Private LimitedJukehi, MP 13.02.15 25.02.15 Loaded

198 Jhingurda 19.01.15 K R PULP & PAPERS LTD. ROZA 13.02.15 24.02.15 Loaded199 Jhingurda 19.01.15 K R PULP & PAPERS LTD. ROZA 14.02.15 27.02.15 Loaded

200 Jhingurda 19.01.15SHREE ENTERPRISES C.S. PVT LTD

Revised to Jagadhri 14.02.15 28.02.15 Loaded

201 Jhingurda 19.01.15 Aravali Power Company Pvt. Ltd

INDIRA GANDHI

SUPER THERMAL

POWER PROJECT

SERVED BY

SUDHARANA

21.02.15 07.03.15 Loaded

Page 7: Jhingurda- Status of loading of rakes a/c e-Auction ... · PDF file3 Jhingurda 27.02.13 NTPC LTD SIPAT Gatora Railway Station, Near Rewa, MP 04.04.13 11.04.13 loaded 4 Jhingurda 27.02.13

S.No. ProjectAuction

DateBidder Name

Destination/

Address

Allotment

Date

Loading

Date

Status of

Loading of

Rakes

Jhingurda- Status of loading of rakes a/c e-Auction (Auction-wise Seniority) as on 17.10.2017 (till midnight)

Jhingurda Project

202 Jhingurda 19.01.15 Aravali Power Company Pvt. Ltd

INDIRA GANDHI

SUPER THERMAL

POWER PROJECT

SERVED BY

SUDHARANA

21.02.15 08.03.15 Loaded

203 Jhingurda 19.01.15 Aravali Power Company Pvt. Ltd

INDIRA GANDHI

SUPER THERMAL

POWER PROJECT

SERVED BY

SUDHARANA

21.02.15 09.03.15 Loaded

204 Jhingurda 19.01.15 Aravali Power Company Pvt. Ltd

INDIRA GANDHI

SUPER THERMAL

POWER PROJECT

SERVED BY

SUDHARANA

21.02.15 10.03.15 Loaded

205 Jhingurda 19.01.15 Aravali Power Company Pvt. Ltd

INDIRA GANDHI

SUPER THERMAL

POWER PROJECT

SERVED BY

SUDHARANA

21.02.15 11.03.15 Loaded

206 Jhingurda 16.02.15 SBC MINERALS PVT. LTD. Beohari 09.03.15 16.03.15 Loaded

207 Jhingurda 16.02.15 SBC MINERALS PVT. LTD. Revised to Kusmhi 11.03.15 25.03.15 Loaded

208 Jhingurda 16.02.15 SBC MINERALS PVT. LTD.Revised to

Vyasnagar11.03.15 27.03.15 Loaded

209 Jhingurda 16.02.15 SBC MINERALS PVT. LTD. Vyasnagar 11.03.15 02.04.15 Loaded

210 Jhingurda 16.02.15Mahakaleshwar Mines & Metals

Pvt Ltd Jukehi, MP 14.03.15 03.04.15 Loaded

211 Jhingurda 16.02.15Mahakaleshwar Mines & Metals

Pvt Ltd Jukehi, MP 14.03.15 05.04.15 Loaded

212 Jhingurda 16.02.15MAHAVIR COAL RESOURCES PVT.

LTD.Rupaund (RPD) 15.03.15 23.03.15 Loaded

213 Jhingurda 16.02.15MAHAVIR COAL RESOURCES PVT.

LTD.Rupaund (RPD) 15.03.15 06.04.15 Loaded

214 Jhingurda 16.02.15 MAIHAR CEMENTMSSG Siding,

Maihar Cement16.03.15 08.04.15 Loaded

215 Jhingurda 16.02.15SHREE ENTERPRISES COAL SALES

PVT LTDRevised To Jagadhri 16.03.15 11.06.15 Loaded

216 Jhingurda 16.02.15Mahakaleshwar Mines & Metals

Pvt Ltd Jukehi, MP 16.03.15 11.04.15 Loaded

217 Jhingurda 16.02.15MAHAVIR COAL RESOURCES PVT.

LTD.Rupaund (RPD) 16.03.15 07.04.15 Loaded

218 Jhingurda 16.02.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

Singrauli 17.03.15 22.03.15 Loaded

219 Jhingurda 16.02.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

Singrauli 17.03.15 28.03.15 Loaded

220 Jhingurda 16.02.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

Singrauli 17.03.15 30.03.15 Loaded

221 Jhingurda 17.03.15Gallantt Ispat Limited

M/s gallantt ispat

ltd, siding,sahjanwa11.04.15 14.04.15 Loaded

222 Jhingurda 17.03.15Gallantt Ispat Limited

M/s gallantt ispat

ltd, siding,sahjanwa12.04.15 15.04.15 Loaded

Page 8: Jhingurda- Status of loading of rakes a/c e-Auction ... · PDF file3 Jhingurda 27.02.13 NTPC LTD SIPAT Gatora Railway Station, Near Rewa, MP 04.04.13 11.04.13 loaded 4 Jhingurda 27.02.13

S.No. ProjectAuction

DateBidder Name

Destination/

Address

Allotment

Date

Loading

Date

Status of

Loading of

Rakes

Jhingurda- Status of loading of rakes a/c e-Auction (Auction-wise Seniority) as on 17.10.2017 (till midnight)

Jhingurda Project

223 Jhingurda 17.03.15 ACC Limited- Kymore Cement

WorksJQSG 13.04.15 16.04.15 Loaded

224 Jhingurda 17.03.15ACC Limited- Kymore Cement

WorksJQSG 15.04.15 18.04.15 Loaded

225 Jhingurda 17.03.15MAHAVIR COAL RESOURCES PVT.

LTD.RPD 15.04.15 19.04.15 Loaded

226 Jhingurda 17.03.15 K R PULP & PAPERS LTD. ROZA 17.04.15 24.04.15 Loaded

227 Jhingurda 17.03.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECTSingrauli 17.04.15 25.04.15 Loaded

228 Jhingurda 17.03.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECTSingrauli 17.04.15 26.04.15 Loaded

229 Jhingurda 17.03.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECTSingrauli 17.04.15 28.04.15 Loaded

230 Jhingurda 17.03.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECTSingrauli 17.04.15 29.04.15 Loaded

231 Jhingurda 24.04.15ACC Limited- Kymore Cement

WorksJQSG 16.05.15 17.05.15 Loaded

232 Jhingurda 24.04.15ACC Limited- Kymore Cement

WorksJQSG 16.05.15 18.05.15 Loaded

233 Jhingurda 24.04.15ACC Limited- Kymore Cement

WorksJQSG 17.05.15 19.05.15 Loaded

234 Jhingurda 24.04.15ACC Limited- Kymore Cement

WorksJQSG 17.05.15 20.05.15 Loaded

235 Jhingurda 24.04.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

Singrauli 18.05.15 21.05.15 Loaded

236 Jhingurda 24.04.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

Singrauli 18.05.15 22-05.15 Loaded

237 Jhingurda 24.04.15 K R PULP & PAPERS LTD. ROZA 20.05.15 23.04.15 Loaded238 Jhingurda 24.04.15 K R PULP & PAPERS LTD. ROZA 20.05.15 24.05.15 Loaded239 Jhingurda 24.04.15 Gallantt Ispat Limited MGIS 21.05.15 25.05.15 Loaded

240 Jhingurda 24.04.15MAHAVIR COAL RESOURCES PVT.

LTD.RPD 21.05.15 26.05.15 Loaded

241 Jhingurda 24.04.15Mahakaleshwar Mines & Metals

Pvt Ltd JKE 23.05.15 27.05.15 Loaded

242 Jhingurda 24.04.15Mahakaleshwar Mines & Metals

Pvt Ltd JKE 23.05.15 29.05.15 Loaded

243 Jhingurda 24.04.15 Birla Corporation Ltd CNAS 24.05.15 29.05.15 Loaded244 Jhingurda 24.04.15 Birla Corporation Ltd CNAS 24.05.15 30.05.15 Loaded

245 Jhingurda 24.04.15Birla Corporation Ltd., Unit Satna

Cement worksBCSW siding, satna 25.05.15 31.05.15 Loaded

246 Jhingurda 28.05.15 K R PULP & PAPERS LTD. Roza 13.06.15 17.06.15 Loaded247 Jhingurda 28.05.15 K R PULP & PAPERS LTD. Roza 13.06.15 18.06.15 Loaded248 Jhingurda 28.05.15 Gallantt Ispat Limited MGIS 14.06.15 19.06.15 Loaded

249 Jhingurda 28.05.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECTHIMB 15.06.15 21.06.15 Loaded

250 Jhingurda 28.05.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECTHIMB 17.06.15 22.06.15 Loaded

251 Jhingurda 28.05.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECTHIMB 17.06.15 24.06.15 Loaded

Page 9: Jhingurda- Status of loading of rakes a/c e-Auction ... · PDF file3 Jhingurda 27.02.13 NTPC LTD SIPAT Gatora Railway Station, Near Rewa, MP 04.04.13 11.04.13 loaded 4 Jhingurda 27.02.13

S.No. ProjectAuction

DateBidder Name

Destination/

Address

Allotment

Date

Loading

Date

Status of

Loading of

Rakes

Jhingurda- Status of loading of rakes a/c e-Auction (Auction-wise Seniority) as on 17.10.2017 (till midnight)

Jhingurda Project

252 Jhingurda 28.05.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECTHIMB 17.06.15 25.06.15 Loaded

253 Jhingurda 28.05.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECTHIMB 17.06.15 27.06.15 Loaded

254 Jhingurda 28.05.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECTHIMB 19.06.15 02.07.15 Loaded

255 Jhingurda 28.05.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECTHIMB 19.06.15 03.07.15 Loaded

256 Jhingurda 29.06.15 MAIHAR CEMENTMSSG Siding,

Maihar Cement16.07.15 17.07.15 Loaded

257 Jhingurda 29.06.15Mahakaleshwar Mines & Metals

Pvt LtdJKE 16.07.15 18.07.15 Loaded

258 Jhingurda 29.06.15Mahakaleshwar Mines & Metals

Pvt LtdJKE 17.07.15 21.07.15 Loaded

259 Jhingurda 29.06.15Mahakaleshwar Mines & Metals

Pvt LtdJKE 17.07.15 22.07.15 Loaded

260 Jhingurda 29.06.15 MAIHAR CEMENTMSSG Siding,

Maihar Cement18.07.15 24.07.15 Loaded

261 Jhingurda 29.06.15 MAIHAR CEMENTMSSG Siding,

Maihar Cement18.07.15 25.07.15 Loaded

262 Jhingurda 29.06.15Mahakaleshwar Mines & Metals

Pvt LtdJKE 19.07.15 26.07.15 Loaded

263 Jhingurda 29.06.15 shri vandana trading corporation NYN 19.07.15 27.07.15 Loaded

264 Jhingurda 29.06.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 20.07.15 28.07.15 Loaded

265 Jhingurda 29.06.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 20.07.15 29.07.15 Loaded

266 Jhingurda 29.06.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 21.07.15 30.07.15 Loaded

267 Jhingurda 29.06.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 21.07.15 30.07.15 Loaded

268 Jhingurda 29.06.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 22.07.15 01.08.15 Loaded

269 Jhingurda 29.06.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 22.07.15 03.08.15 Loaded

270 Jhingurda 29.06.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 23.07.15 05.08.15 Loaded

271 Jhingurda 29.06.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 23.07.15 06.08.15 Loaded

272 Jhingurda 29.06.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 24.07.15 07.08.15 Loaded

273 Jhingurda 29.06.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 24.07.15 08.08.15 Loaded

Page 10: Jhingurda- Status of loading of rakes a/c e-Auction ... · PDF file3 Jhingurda 27.02.13 NTPC LTD SIPAT Gatora Railway Station, Near Rewa, MP 04.04.13 11.04.13 loaded 4 Jhingurda 27.02.13

S.No. ProjectAuction

DateBidder Name

Destination/

Address

Allotment

Date

Loading

Date

Status of

Loading of

Rakes

Jhingurda- Status of loading of rakes a/c e-Auction (Auction-wise Seniority) as on 17.10.2017 (till midnight)

Jhingurda Project

274 Jhingurda 29.06.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 25.07.15 09.08.15 Loaded

275 Jhingurda 29.06.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 25.07.15 10.08.15 Loaded

276 Jhingurda 29.07.15 JAIPRAKASH ASSOCIATES LIMITED

(Unit: Jaypee REWA Plant)JPCC 18.08.15 20.08.15 Loaded

277 Jhingurda 29.07.15 JAIPRAKASH ASSOCIATES LIMITED

(Unit: Jaypee REWA Plant)JPCC 18.08.15 21.08.15 Loaded

278 Jhingurda 29.07.15 JAIPRAKASH ASSOCIATES LIMITED

(Unit: Jaypee REWA Plant)JPCC 19.08.15 22.08.15 Loaded

279 Jhingurda 29.07.15 JAIPRAKASH ASSOCIATES LIMITED

(Unit: Jaypee REWA Plant)JPCC 19.08.15 24.08.15 Loaded

280 Jhingurda 29.07.15 JAIPRAKASH ASSOCIATES LIMITED

(Unit: Jaypee REWA Plant)JPCC 20.08.15 25.08.15 Loaded

281 Jhingurda 29.07.15 K R PULP & PAPERS LTD. Roza 20.08.15 27.08.15 Loaded

282 Jhingurda 29.07.15Hira Coal Mines Private Limited

NYN 20.08.15 27.08.15 Loaded

283 Jhingurda 29.07.15Hira Coal Mines Private Limited

NYN 21.08.15 29.08.15 Loaded

284 Jhingurda 29.07.15Hira Coal Mines Private Limited

NYN 21.08.15 30.08.15 Loaded

285 Jhingurda 29.07.15shri vandana trading corporation

NYN 21.08.15 01.09.15 Loaded

286 Jhingurda 29.07.15 HINDALCO INDUSTRIES LIMITED

MAHAN ALUMINIUM PROJECTSGRL 22.08.15 31.08.15 Loaded

287 Jhingurda 29.07.15 HINDALCO INDUSTRIES LIMITED

MAHAN ALUMINIUM PROJECTSGRL 22.08.15 02.09.15 Loaded

288 Jhingurda 29.07.15 HINDALCO INDUSTRIES LIMITED

MAHAN ALUMINIUM PROJECTSGRL 22.08.15 03.09.15 Loaded

289 Jhingurda 29.07.15 HINDALCO INDUSTRIES LIMITED

MAHAN ALUMINIUM PROJECTSGRL 23.08.15 04.09.15 Loaded

290 Jhingurda 29.07.15 HINDALCO INDUSTRIES LIMITED

MAHAN ALUMINIUM PROJECTSGRL 23.08.15 06.09.15 Loaded

291 Jhingurda 29.07.15 HINDALCO INDUSTRIES LIMITED

MAHAN ALUMINIUM PROJECTSGRL 23.08.15 07.09.15 Loaded

292 Jhingurda 29.07.15 HINDALCO INDUSTRIES LIMITED

MAHAN ALUMINIUM PROJECTSGRL 24.08.15 09.09.15 Loaded

293 Jhingurda 29.07.15 HINDALCO INDUSTRIES LIMITED

MAHAN ALUMINIUM PROJECTSGRL 24.08.15 10.09.15 Loaded

294 Jhingurda 29.07.15 HINDALCO INDUSTRIES LIMITED

MAHAN ALUMINIUM PROJECTSGRL 24.08.15 11.09.15 Loaded

Page 11: Jhingurda- Status of loading of rakes a/c e-Auction ... · PDF file3 Jhingurda 27.02.13 NTPC LTD SIPAT Gatora Railway Station, Near Rewa, MP 04.04.13 11.04.13 loaded 4 Jhingurda 27.02.13

S.No. ProjectAuction

DateBidder Name

Destination/

Address

Allotment

Date

Loading

Date

Status of

Loading of

Rakes

Jhingurda- Status of loading of rakes a/c e-Auction (Auction-wise Seniority) as on 17.10.2017 (till midnight)

Jhingurda Project

295 Jhingurda 29.07.15 HINDALCO INDUSTRIES LIMITED

MAHAN ALUMINIUM PROJECTSGRL 25.08.15 14.09.15 Loaded

296 Jhingurda 29.07.15 HINDALCO INDUSTRIES LIMITED

MAHAN ALUMINIUM PROJECTSGRL 25.08.15 15.09.15 Loaded

297 Jhingurda 29.07.15 HINDALCO INDUSTRIES LIMITED

MAHAN ALUMINIUM PROJECTSGRL 25.08.15 17.09.15 Loaded

298 Jhingurda 29.07.15 HINDALCO INDUSTRIES LIMITED

MAHAN ALUMINIUM PROJECTSGRL 26.08.15 18.09.15 Loaded

299 Jhingurda 29.07.15 HINDALCO INDUSTRIES LIMITED

MAHAN ALUMINIUM PROJECTSGRL 26.08.15 19.09.15 Loaded

300 Jhingurda 29.07.15 HINDALCO INDUSTRIES LIMITED

MAHAN ALUMINIUM PROJECTSGRL 26.08.15 20.09.15 Loaded

301 Jhingurda 27.08.15 Hira coal Mines Private Limited NYN 16.09.15 26.09.15 Loaded

302 Jhingurda 27.08.15Mahakaleshwar Mines & Metals

Pvt LtdJKE 16.09.15 27.09.15 Loaded

303 Jhingurda 27.08.15Mahakaleshwar Mines & Metals

Pvt LtdJKE 17.09.15 28.09.15 Loaded

304 Jhingurda 27.08.15 SBC MINERALS PVT. LTD. Revsied to BEHR 17.09.15 29.09.15 Loaded

305 Jhingurda 27.08.15Jaiprakash Associates Ltd. (Unit:

Jaypee Churk Industrial Complex)JPCC 18.09.15 30.09.15 Loaded

306 Jhingurda 27.08.15JAIPRAKASH ASSOCIATES LIMITED

(UNIT : JAYPEE REWA PLANT)JRCS 20.09.15 01.10.15 Loaded

307 Jhingurda 27.08.15JAIPRAKASH ASSOCIATES LIMITED

(UNIT : JAYPEE REWA PLANT)JRCS 20.09.15 02.10.15 Loaded

308 Jhingurda 27.08.15Jaiprakash Associates

Ltd.(Unit:Chunar Cement Factory)MJAC 21.09.15 04.10.15 Loaded

309 Jhingurda 27.08.15Jaiprakash Associates

Ltd.(Unit:Chunar Cement Factory)MJAC 21.09.15 05.10.15 Loaded

310 Jhingurda 27.08.15 Hira coal Mines Private Limited NYN 22.09.15 06.10.15 Loaded

311 Jhingurda 27.08.15 Hira coal Mines Private Limited NYN 22.09.15 11.10.15 Loaded

312 Jhingurda 27.08.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 22.09.15 07.10.15 Loaded

313 Jhingurda 27.08.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 22.09.15 09.10.15 Loaded

314 Jhingurda 27.08.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 22.09.15 10.10.15 Loaded

315 Jhingurda 27.08.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 23.09.15 12.10.15 Loaded

316 Jhingurda 27.08.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 23.09.15 13.10.15 Loaded

Page 12: Jhingurda- Status of loading of rakes a/c e-Auction ... · PDF file3 Jhingurda 27.02.13 NTPC LTD SIPAT Gatora Railway Station, Near Rewa, MP 04.04.13 11.04.13 loaded 4 Jhingurda 27.02.13

S.No. ProjectAuction

DateBidder Name

Destination/

Address

Allotment

Date

Loading

Date

Status of

Loading of

Rakes

Jhingurda- Status of loading of rakes a/c e-Auction (Auction-wise Seniority) as on 17.10.2017 (till midnight)

Jhingurda Project

317 Jhingurda 27.08.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 24.09.15 14.10.15 Loaded

318 Jhingurda 27.08.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 24.09.15 15.10.15 Loaded

319 Jhingurda 27.08.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 25.09.15 16.10.15 Loaded

320 Jhingurda 27.08.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 25.09.15 17.10.15 Loaded

321 Jhingurda 22.09.15

Jaiprakash Associates Ltd.

(Unit:Jaypee Churk Industrial

Complex)

JPCC 19.10.15 21.10.15 Loaded

322 Jhingurda 22.09.15

Jaiprakash Associates Ltd.

(Unit:Jaypee Churk Industrial

Complex)

JPCC 19.10.15 22.10.15 Loaded

323 Jhingurda 22.09.15

Jaiprakash Associates Ltd.

(Unit:Jaypee Churk Industrial

Complex)JPCC 19.10.15 23.10.15 Loaded

324 Jhingurda 22.09.15 Hira Coal Mines Private Limited NYN 20.10.15 24.10.15 Loaded

325 Jhingurda 22.09.15 Hira Coal Mines Private Limited NYN 20.10.15 25.10.15 Loaded

326 Jhingurda 22.09.15 Hira Coal Mines Private Limited NYN 20.10.15 26.10.15 Loaded

327 Jhingurda 22.09.15Mahakaleshwar Mines & Metals

Private LimitedJKE 21.10.15 27.10.15 Loaded

328 Jhingurda 22.09.15Mahakaleshwar Mines & Metals

Private LimitedJKE 22.10.15 28.10.15 Loaded

329 Jhingurda 22.09.15HINDALCO INDUSTRIES LIMITED

MAHAN ALUMINIUM PROJECTHIMB 23.10.15 30.10.15 Loaded

330 Jhingurda 22.09.15HINDALCO INDUSTRIES LIMITED

MAHAN ALUMINIUM PROJECTHIMB 23.10.15 31.10.15 Loaded

331 Jhingurda 29.10.15Mahakaleshwar Mines & Metals

Pvt Ltd JKE 14.11.15 15.11.15 Loaded

332 Jhingurda 29.10.15Mahakaleshwar Mines & Metals

Pvt Ltd JKE 14.11.15 16.11.15 Loaded

333 Jhingurda 29.10.15 SBC MINERALS (P) LTD UDPR 15.11.15 17.11.15 Loaded334 Jhingurda 29.10.15 SBC MINERALS (P) LTD UDPR 15.11.15 18.11.15 Loaded335 Jhingurda 29.10.15 ROSA POWER SUPPLY CO. LTD. PMRP 16.11.15 19.11.15 Loaded336 Jhingurda 29.10.15 ROSA POWER SUPPLY CO. LTD. PMRP 16.11.15 20.11.15 Loaded337 Jhingurda 29.10.15 ROSA POWER SUPPLY CO. LTD. PMRP 17.11.15 21.11.15 Loaded338 Jhingurda 29.10.15 ROSA POWER SUPPLY CO. LTD. PMRP 17.11.15 22.11.15 Loaded339 Jhingurda 29.10.15 ROSA POWER SUPPLY CO. LTD. PMRP 18.11.15 23.11.15 Loaded340 Jhingurda 29.10.15 ROSA POWER SUPPLY CO. LTD. PMRP 18.11.15 25.11.15 Loaded341 Jhingurda 29.10.15 ROSA POWER SUPPLY CO. LTD. PMRP 19.11.15 26.11.15 Loaded342 Jhingurda 29.10.15 ROSA POWER SUPPLY CO. LTD. PMRP 19.11.15 27.11.15 Loaded343 Jhingurda 29.10.15 ROSA POWER SUPPLY CO. LTD. PMRP 20.11.15 28.11.15 Loaded344 Jhingurda 29.10.15 ROSA POWER SUPPLY CO. LTD. PMRP 20.11.15 29.11.15 Loaded

345 Jhingurda 29.10.15 ROSA POWER SUPPLY CO. LTD. PMRP 20.11.15 29.11.15 Loaded

346 Jhingurda 30.11.15 Gallantt Ispat Limited MGIS 16.12.15 18.12.15 Loaded

347 Jhingurda 30.11.15 MB Power (Madhya Pradesh) Ltd MBPJ 18.12.15 19.12.15 Loaded

348 Jhingurda 30.11.15 MB Power (Madhya Pradesh) Ltd MBPJ 18.12.15 20.12.15 Loaded

Page 13: Jhingurda- Status of loading of rakes a/c e-Auction ... · PDF file3 Jhingurda 27.02.13 NTPC LTD SIPAT Gatora Railway Station, Near Rewa, MP 04.04.13 11.04.13 loaded 4 Jhingurda 27.02.13

S.No. ProjectAuction

DateBidder Name

Destination/

Address

Allotment

Date

Loading

Date

Status of

Loading of

Rakes

Jhingurda- Status of loading of rakes a/c e-Auction (Auction-wise Seniority) as on 17.10.2017 (till midnight)

Jhingurda Project

349 Jhingurda 30.11.15 Scan Steels Limited JKE 18.12.15 22.12.15 Loaded350 Jhingurda 30.11.15 hindalco industries limited KRSL 18.12.15 22.12.15 Loaded351 Jhingurda 30.11.15 hindalco industries limited KRSL 19.12.15 23.12.15 Loaded352 Jhingurda 30.11.15 hindalco industries limited KRSL 19.12.15 24.12.15 Loaded353 Jhingurda 30.11.15 hindalco industries limited KRSL 20.12.15 25.12.15 Loaded354 Jhingurda 30.11.15 hindalco industries limited KRSL 20.12.15 26.12.15 Loaded355 Jhingurda 30.11.15 hindalco industries limited KRSL 21.12.15 27.12.15 Loaded356 Jhingurda 30.11.15 hindalco industries limited KRSL 21.12.15 28.12.15 Loaded357 Jhingurda 30.11.15 hindalco industries limited KRSL 24..12.15 29.12.15 Loaded358 Jhingurda 30.11.15 hindalco industries limited KRSL 24.12.15 30.12.15 Loaded359 Jhingurda 30.11.15 hindalco industries limited KRSL 25.12.15 31.12.15 Loaded360 Jhingurda 30.11.15 hindalco industries limited HACG 25.12.15 01.01.16 Loaded361 Jhingurda 30.11.15 hindalco industries limited HACG 26.12.15 02.01.16 Loaded362 Jhingurda 30.11.15 hindalco industries limited HACG 26.12.15 03.01.16 Loaded363 Jhingurda 30.11.15 hindalco industries limited HACG 27.12.15 04.01.16 Loaded364 Jhingurda 30.11.15 hindalco industries limited HACG 27.12.15 05.01.16 Loaded

365 Jhingurda 30.11.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 28.12.15 08.01.16 Loaded

366 Jhingurda 30.11.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 28.12.15 09.01.16 Loaded

367 Jhingurda 30.11.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 28.12.15 10.01.16 Loaded

368 Jhingurda 30.11.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 28.12.15 11.01.16 Loaded

369 Jhingurda 30.11.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 28.12.15 12.01.16 Loaded

370 Jhingurda 30.11.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 28.12.15 16.01.16 Loaded

371 Jhingurda 22.12.15 SBC MINERALS (P) LTD BEHR 13.01.16 14.01.16 Loaded

372 Jhingurda 22.12.15Mahakaleshwar Mines & Metals

Pvt Ltd JKE 13.01.16 17.01.16 Loaded

373 Jhingurda 22.12.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 15.01.16 19.01.16 Loaded

374 Jhingurda 22.12.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 15.01.16 21.01.16 Loaded

375 Jhingurda 22.12.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 16.01.16 22.01.16 Loaded

376 Jhingurda 22.12.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 16.01.16 23.01.16 Loaded

377 Jhingurda 22.12.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 18.01.16 25.01.16 Loaded

378 Jhingurda 22.12.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 18.01.16 28.01.16 Loaded

379 Jhingurda 22.12.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 18.01.16 29.01.16 Loaded

Page 14: Jhingurda- Status of loading of rakes a/c e-Auction ... · PDF file3 Jhingurda 27.02.13 NTPC LTD SIPAT Gatora Railway Station, Near Rewa, MP 04.04.13 11.04.13 loaded 4 Jhingurda 27.02.13

S.No. ProjectAuction

DateBidder Name

Destination/

Address

Allotment

Date

Loading

Date

Status of

Loading of

Rakes

Jhingurda- Status of loading of rakes a/c e-Auction (Auction-wise Seniority) as on 17.10.2017 (till midnight)

Jhingurda Project

380 Jhingurda 22.12.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 20.01.16 01.02.16 Loaded

381 Jhingurda 22.12.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 20.01.16 02.02.16 Loaded

382 Jhingurda 22.12.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 20.01.16 03.02.16 Loaded

383 Jhingurda 22.12.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 21.01.16 04.02.16 Loaded

384 Jhingurda 22.12.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 21.01.16 05.02.16 Loaded

385 Jhingurda 22.12.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 21.01.16 08.02.16 Loaded

386 Jhingurda 22.12.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 22.01.16 09.02.16 Loaded

387 Jhingurda 22.12.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 22.01.16 10.02.16 Loaded

388 Jhingurda 22.12.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 22.01.16 11.02.16 Loaded

389 Jhingurda 22.12.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 23.01.16 12.02.16 Loaded

390 Jhingurda 22.12.15

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 23.01.16 13.02.16 Loaded

391 Jhingurda 22.12.15 hindalco industries limited HACG 23.01.16 14.02.16 Loaded392 Jhingurda 22.12.15 hindalco industries limited HACG 24.01.16 15.02.16 Loaded393 Jhingurda 22.12.15 hindalco industries limited HACG 24.01.16 16.02.16 Loaded394 Jhingurda 22.12.15 hindalco industries limited HACG 24.01.16 17.02.16 Loaded395 Jhingurda 22.12.15 hindalco industries limited HACG 25.01.16 18.02.16 Loaded396 Jhingurda 22.12.15 hindalco industries limited KRSL 25.01.16 19.02.16 Loaded397 Jhingurda 22.12.15 hindalco industries limited KRSL 25.01.16 20.02.16 Loaded398 Jhingurda 22.12.15 hindalco industries limited KRSL 26.01.16 21.02.16 Loaded399 Jhingurda 22.12.15 hindalco industries limited KRSL 26.01.16 22.02.16 Loaded400 Jhingurda 22.12.15 hindalco industries limited KRSL 27.01.16 23.02.16 Loaded401 Jhingurda 22.12.15 hindalco industries limited KRSL 27.01.16 24.02.16 Loaded402 Jhingurda 22.12.15 hindalco industries limited KRSL 28.01.16 25.02.16 Loaded403 Jhingurda 22.12.15 hindalco industries limited KRSL 28.01.16 26.02.16 Loaded404 Jhingurda 22.12.15 hindalco industries limited KRSL 29.01.16 29.02.16 Loaded

405 Jhingurda 22.12.15 hindalco industries limited KRSL 29.01.16 02.03.16 Loaded

406 Jhingurda 25.01.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 28.02.16 03.03.16 Loaded

407 Jhingurda 25.01.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 28.02.16 04.03.16 Loaded

408 Jhingurda 25.01.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 29.02.16 05.03.16 Loaded

Page 15: Jhingurda- Status of loading of rakes a/c e-Auction ... · PDF file3 Jhingurda 27.02.13 NTPC LTD SIPAT Gatora Railway Station, Near Rewa, MP 04.04.13 11.04.13 loaded 4 Jhingurda 27.02.13

S.No. ProjectAuction

DateBidder Name

Destination/

Address

Allotment

Date

Loading

Date

Status of

Loading of

Rakes

Jhingurda- Status of loading of rakes a/c e-Auction (Auction-wise Seniority) as on 17.10.2017 (till midnight)

Jhingurda Project

409 Jhingurda 25.01.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 29.02.16 06.03.16 Loaded

410 Jhingurda 25.01.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 01.03.16 07.03.16 Loaded

411 Jhingurda 25.01.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 01.03.16 08.03.16 Loaded

412 Jhingurda 25.01.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 03.03.16 09.03.16 Loaded

413 Jhingurda 25.01.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 03.03.16 10.03.16 Loaded

414 Jhingurda 25.01.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 04.03.16 11.03.16 Loaded

415 Jhingurda 25.01.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 04.03.16 12.03.16 Loaded

416 Jhingurda 25.01.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 05.03.16 13.03.16 Loaded

417 Jhingurda 25.01.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 05.03.16 1403.16 Loaded

418 Jhingurda 25.01.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 06.03.16 15.03.16 Loaded

419 Jhingurda 25.01.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 07.03.16 16.03.16 Loaded

420 Jhingurda 25.01.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 07.03.16 17.03.16 Loaded

421 Jhingurda 25.01.16Mahakaleshwar Mines & Metals

Pvt LtdJKE 08.03.16 19.03.16 Loaded

422 Jhingurda 25.01.16Mahakaleshwar Mines & Metals

Pvt LtdJKE 09.03.16 20.03.16 Loaded

423 Jhingurda 25.01.16 SBC MINERALS (P) LTD BEHR 10.03.16 22.03.16 Loaded

424 Jhingurda 25.01.16NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 10.03.16 21.03.16 Loaded

425 Jhingurda 25.01.16NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 11.03.16 23.03.16 Loaded

426 Jhingurda 25.01.16NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 11.03.16 23.03.16 Loaded

427 Jhingurda 25.01.16NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 12.03.16 24.03.16 Loaded

428 Jhingurda 25.01.16NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 12.03.16 25.03.16 Loaded

429 Jhingurda 25.01.16NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 13.03.16 26.03.16 Loaded

430 Jhingurda 25.01.16NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 13.03.16 27.03.16 Loaded

431 Jhingurda 25.01.16NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 14.03.16 28.03.16 Loaded

432 Jhingurda 25.01.16NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 14.03.16 29.03.16 Loaded

Page 16: Jhingurda- Status of loading of rakes a/c e-Auction ... · PDF file3 Jhingurda 27.02.13 NTPC LTD SIPAT Gatora Railway Station, Near Rewa, MP 04.04.13 11.04.13 loaded 4 Jhingurda 27.02.13

S.No. ProjectAuction

DateBidder Name

Destination/

Address

Allotment

Date

Loading

Date

Status of

Loading of

Rakes

Jhingurda- Status of loading of rakes a/c e-Auction (Auction-wise Seniority) as on 17.10.2017 (till midnight)

Jhingurda Project

433 Jhingurda 25.01.16NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 15.03.16 30.03.16 Loaded

434 Jhingurda 25.01.16NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 15.03.16 31.03.16 Loaded

435 Jhingurda 25.01.16NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 16.03.16 02.04.16 Loaded

436 Jhingurda 22.02.16 Scan Steels Limited JKE 01.04.16 03.04.16 Loaded

437 Jhingurda 22.02.16

Jaypee Nigrie Super Thermal

Power Project(A unit of

JaiprakashPowerVentures Ltd)

JPVN 02.04.16 04.04.16 Loaded

438 Jhingurda 22.02.16

Jaypee Nigrie Super Thermal

Power Project(A unit of

JaiprakashPowerVentures Ltd)

JPVN 03.04.16 05.04.16 Loaded

439 Jhingurda 22.02.16

Jaypee Nigrie Super Thermal

Power Project(A unit of

JaiprakashPowerVentures Ltd)

JPVN 03.04.16 06.04.16 Loaded

440 Jhingurda 22.02.16

Jaypee Nigrie Super Thermal

Power Project(A unit of

JaiprakashPowerVentures Ltd)

JPVN 04.04.16 07.04.16 Loaded

441 Jhingurda 22.02.16

Jaypee Nigrie Super Thermal

Power Project(A unit of

JaiprakashPowerVentures Ltd)

JPVN 05.04.16 08.04.16 Loaded

442 Jhingurda 22.02.16

Jaypee Nigrie Super Thermal

Power Project(A unit of

JaiprakashPowerVentures Ltd)

JPVN 05.04.16 09.04.16 Loaded

443 Jhingurda 22.02.16

Jaypee Nigrie Super Thermal

Power Project(A unit of

JaiprakashPowerVentures Ltd)

JPVN 06.04.16 10.04.16 Loaded

444 Jhingurda 22.02.16

Jaypee Nigrie Super Thermal

Power Project(A unit of

JaiprakashPowerVentures Ltd)

JPVN 06.04.16 11.04.16 Loaded

445 Jhingurda 22.02.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 06.04.16 12.04.16 Loaded

446 Jhingurda 22.02.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 07.04.16 13.04.16 Loaded

447 Jhingurda 22.02.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 07.04.16 14.04.16 Loaded

448 Jhingurda 22.02.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 07.04.16 15.04.16 Loaded

449 Jhingurda 22.02.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 08.04.16 16.04.16 Loaded

450 Jhingurda 22.02.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 08.04.16 17.04.16 Loaded

451 Jhingurda 22.02.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 08.04.16 18.04.16 Loaded

452 Jhingurda 22.02.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 09.04.16 19.04.16 Loaded

453 Jhingurda 22.02.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 09.04.16 20.04.16 Loaded

Page 17: Jhingurda- Status of loading of rakes a/c e-Auction ... · PDF file3 Jhingurda 27.02.13 NTPC LTD SIPAT Gatora Railway Station, Near Rewa, MP 04.04.13 11.04.13 loaded 4 Jhingurda 27.02.13

S.No. ProjectAuction

DateBidder Name

Destination/

Address

Allotment

Date

Loading

Date

Status of

Loading of

Rakes

Jhingurda- Status of loading of rakes a/c e-Auction (Auction-wise Seniority) as on 17.10.2017 (till midnight)

Jhingurda Project

454 Jhingurda 22.02.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 09.04.16 21.04.16 Loaded

455 Jhingurda 22.02.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 10.04.16 22.04.16 Loaded

456 Jhingurda 22.02.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 10.04.16 23.04.16 Loaded

457 Jhingurda 22.02.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 10.04.16 24.04.16 Loaded

458 Jhingurda 22.02.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 11.04.16 25.04.16 Loaded

459 Jhingurda 22.02.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 11.04.16 26.04.16 Loaded

460 Jhingurda 22.02.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 11.04.16 27.04.16 Loaded

461 Jhingurda 22.02.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 12.04.16 28.04.16 Loaded

462 Jhingurda 22.02.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 12.04.16 29.04.16 Loaded

463 Jhingurda 22.02.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 12.04.16 30.04.16 Loaded

464 Jhingurda 22.02.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 13.04.16 01.05.16 Loaded

465 Jhingurda 22.02.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 13.04.16 02.05.16 Loaded

466 Jhingurda 17.03.16 Scan Steels Limited JKE 02.05.16 03.05.16 Loaded467 Jhingurda 17.03.16 hindalco industries limited KRSL 03.05.16 04.05.16 Loaded468 Jhingurda 17.03.16 hindalco industries limited KRSL 03.05.16 05.05.16 Loaded469 Jhingurda 17.03.16 hindalco industries limited KRSL 03.05.16 06.05.16 Loaded470 Jhingurda 17.03.16 hindalco industries limited KRSL 05.05.16 07.05.16 Loaded471 Jhingurda 17.03.16 hindalco industries limited KRSL 05.05.16 09.05.16 Loaded472 Jhingurda 17.03.16 hindalco industries limited KRSL 08.05.16 10.05.16 Loaded473 Jhingurda 17.03.16 hindalco industries limited KRSL 08.05.16 11.05.16 Loaded474 Jhingurda 17.03.16 hindalco industries limited KRSL 08.05.16 12.05.16 Loaded475 Jhingurda 17.03.16 hindalco industries limited KRSL 08.05.16 13.05.16 Loaded476 Jhingurda 17.03.16 hindalco industries limited KRSL 09.05.16 14.05.16 Loaded477 Jhingurda 17.03.16 hindalco industries limited KRSL 09.05.16 15.05.16 Loaded478 Jhingurda 17.03.16 hindalco industries limited KRSL 09.05.16 16.05.16 Loaded479 Jhingurda 17.03.16 hindalco industries limited KRSL 09.05.16 17.05.16 Loaded480 Jhingurda 17.03.16 hindalco industries limited KRSL 12.05.16 18.05.16 Loaded481 Jhingurda 17.03.16 hindalco industries limited KRSL 12.05.16 19.05.16 Loaded482 Jhingurda 17.03.16 hindalco industries limited KRSL 13.05.16 20.05.16 Loaded483 Jhingurda 17.03.16 hindalco industries limited KRSL 13.05.16 21.05.16 Loaded484 Jhingurda 17.03.16 hindalco industries limited KRSL 13.05.16 22.05.16 Loaded485 Jhingurda 17.03.16 hindalco industries limited KRSL 14.05.16 23.05.16 Loaded486 Jhingurda 17.03.16 hindalco industries limited KRSL 14.05.16 24.05.16 Loaded487 Jhingurda 17.03.16 hindalco industries limited KRSL 15.05.16 25.05.16 Loaded488 Jhingurda 17.03.16 hindalco industries limited KRSL 15.05.16 26.05.16 Loaded

Page 18: Jhingurda- Status of loading of rakes a/c e-Auction ... · PDF file3 Jhingurda 27.02.13 NTPC LTD SIPAT Gatora Railway Station, Near Rewa, MP 04.04.13 11.04.13 loaded 4 Jhingurda 27.02.13

S.No. ProjectAuction

DateBidder Name

Destination/

Address

Allotment

Date

Loading

Date

Status of

Loading of

Rakes

Jhingurda- Status of loading of rakes a/c e-Auction (Auction-wise Seniority) as on 17.10.2017 (till midnight)

Jhingurda Project

489 Jhingurda 17.03.16 hindalco industries limited KRSL 16.05.16 27.05.16 Loaded490 Jhingurda 17.03.16 hindalco industries limited KRSL 16.05.16 28.05.16 Loaded491 Jhingurda 17.03.16 hindalco industries limited KRSL 17.05.16 29.05.16 Loaded492 Jhingurda 17.03.16 hindalco industries limited KRSL 17.05.16 30.05.16 Loaded493 Jhingurda 17.03.16 hindalco industries limited KRSL 18.05.16 31.05.16 Loaded494 Jhingurda 17.03.16 hindalco industries limited KRSL 18.05.16 01.06.16 Loaded495 Jhingurda 17.03.16 hindalco industries limited KRSL 19.05.16 05.06.16 Loaded496 Jhingurda 17.03.16 hindalco industries limited KRSL 19.05.16 06.06.16 Loaded

497 Jhingurda 17.03.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 19.05.16 07.06.16 Loaded

498 Jhingurda 17.03.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 19.05.16 08.06.16 Loaded

499 Jhingurda 17.03.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 19.05.16 09.06.16 Loaded

500 Jhingurda 17.03.16 SBC MINERALS (P) LTD BEHR 19.05.16 11.06.16 Loaded

501 Jhingurda 26.04.16 hindalco industries limited HACG 07.06.16 12.06.16 Loaded502 Jhingurda 26.04.16 hindalco industries limited HACG 08.06.16 13.06.16 Loaded503 Jhingurda 26.04.16 hindalco industries limited HACG 09.06.16 14.06.16 Loaded504 Jhingurda 26.04.16 hindalco industries limited HACG 09.06.16 15.06.16 Loaded505 Jhingurda 26.04.16 hindalco industries limited HACG 10.06.16 16.06.16 Loaded506 Jhingurda 26.04.16 hindalco industries limited HACG 10.06.16 17.06.16 Loaded507 Jhingurda 26.04.16 hindalco industries limited HACG 11.06.16 18.06.16 Loaded508 Jhingurda 26.04.16 hindalco industries limited HACG 11.06.16 20.06.16 Loaded509 Jhingurda 26.04.16 hindalco industries limited HACG 12.06.16 21.06.16 Loaded510 Jhingurda 26.04.16 hindalco industries limited HACG 12.06.16 22.06.16 Loaded

511 Jhingurda 26.04.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 13.06.16 23.06.16 Loaded

512 Jhingurda 26.04.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 13.06.16 25.06.16 Loaded

513 Jhingurda 26.04.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 14.06.16 26.06.16 Loaded

514 Jhingurda 26.04.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 14.06.16 27.06.16 Loaded

515 Jhingurda 26.04.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 15.06.16 28.06.16 Loaded

516 Jhingurda 26.04.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 15.06.16 29.06.16 Loaded

517 Jhingurda 26.04.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 16.06.16 30.06.16 Loaded

518 Jhingurda 26.04.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 16.06.16 02.07.16 Loaded

519 Jhingurda 26.04.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 17.06.16 03.07.16 Loaded

520 Jhingurda 26.04.16 Scan Steels Limited JKE 17.06.16 05.07.16 Loaded521 Jhingurda 26.04.16 Scan Steels Limited JKE 18.06.16 07.07.16 Loaded522 Jhingurda 26.04.16 Scan Steels Limited JKE 18.06.16 07.07.16 Loaded

Page 19: Jhingurda- Status of loading of rakes a/c e-Auction ... · PDF file3 Jhingurda 27.02.13 NTPC LTD SIPAT Gatora Railway Station, Near Rewa, MP 04.04.13 11.04.13 loaded 4 Jhingurda 27.02.13

S.No. ProjectAuction

DateBidder Name

Destination/

Address

Allotment

Date

Loading

Date

Status of

Loading of

Rakes

Jhingurda- Status of loading of rakes a/c e-Auction (Auction-wise Seniority) as on 17.10.2017 (till midnight)

Jhingurda Project

523 Jhingurda 26.04.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 19.06.16 08.07.16 Loaded

524 Jhingurda 26.04.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 19.06.16 09.07.16 Loaded

525 Jhingurda 26.04.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 20.06.16 10.07.16 Loaded

526 Jhingurda 26.04.16 Gallantt Ispat Limited MGIS 20.06.16 11.07.16 Loaded

527 Jhingurda 26.04.16 Sanjay Trading Company JKE 20.06.16 12.07.16 Loaded

528 Jhingurda 23.05.16Mahakaleshwar Mines & Metals

Pvt Ltd JKE 01.07.16 13.07.16 Loaded

529 Jhingurda 23.05.16Swastik Coal Corporation Private

LimitedKPV 01.07.16 14.07.16 Loaded

530 Jhingurda 23.05.16 IBC IMPEX PRIVATE LIMITED Revised to ROZA JN. 02.07.16 15.07.16 Loaded

531 Jhingurda 23.05.16 hindalco industries limited HACG 02.07.16 16.07.16 Loaded532 Jhingurda 23.05.16 hindalco industries limited HACG 03.07.16 18.07.16 Loaded533 Jhingurda 23.05.16 hindalco industries limited HACG 03.07.16 18.07.16 Loaded534 Jhingurda 23.05.16 hindalco industries limited HACG 04.07.16 19.07.16 Loaded535 Jhingurda 23.05.16 hindalco industries limited HACG 04.07.16 20.07.16 Loaded536 Jhingurda 23.05.16 hindalco industries limited HACG 05.07.16 22.07.16 Loaded

537 Jhingurda 23.05.16 hindalco industries limited HACG 05.07.16 23.07.16 Loaded

538 Jhingurda 20.06.16 AWADH ENTERPRISES BEHR 19.07.16 24.07.16 Loaded

539 Jhingurda 20.06.16MAHAVIR COAL RESOURCES PVT.

LTD.RPD 19.07.16 25.07.16 Loaded

540 Jhingurda 20.06.16MAHAVIR COAL RESOURCES PVT.

LTD.RPD 20.07.16 26.07.16 Loaded

541 Jhingurda 20.06.16 INDIA GLYCOLS LIMITED KPV 20.07.16 28.07.16 Loaded

542 Jhingurda 20.06.16 INDIA GLYCOLS LIMITED KPV 21.07.16 29.07.16 Loaded

543 Jhingurda 20.06.16 Gallantt Ispat Limited MGIS 26.07.16 31.07.16 Loaded

544 Jhingurda 20.06.16 Gallantt Ispat Limited MGIS 26.07.16 01.08.16 Loaded

545 Jhingurda 20.06.16 SBC MINERALS PVT. LTD. BEHR 27.07.16 03.08.16 Loaded

546 Jhingurda 20.06.16 SBC MINERALS PVT. LTD. BEHR 27.07.16 03.08.16 Loaded

547 Jhingurda 20.06.16Mahakaleshwar Mines & Metals

Pvt LtdJKE 28.07.16 04.08.16 Loaded

548 Jhingurda 20.06.16 PODDAR COAL SALES BEHR 28.07.16 05.08.16 Loaded

549 Jhingurda 20.06.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 29.07.16 06.08.16 Loaded

550 Jhingurda 20.06.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 29.07.16 07.08.16 Loaded

551 Jhingurda 20.06.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 30.07.16 08.08.16 Loaded

552 Jhingurda 20.06.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 30.07.16 09.08.16 Loaded

553 Jhingurda 20.06.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 31.07.16 10.08.16 Loaded

554 Jhingurda 20.06.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 31.07.16 11.08.16 Loaded

Page 20: Jhingurda- Status of loading of rakes a/c e-Auction ... · PDF file3 Jhingurda 27.02.13 NTPC LTD SIPAT Gatora Railway Station, Near Rewa, MP 04.04.13 11.04.13 loaded 4 Jhingurda 27.02.13

S.No. ProjectAuction

DateBidder Name

Destination/

Address

Allotment

Date

Loading

Date

Status of

Loading of

Rakes

Jhingurda- Status of loading of rakes a/c e-Auction (Auction-wise Seniority) as on 17.10.2017 (till midnight)

Jhingurda Project

555 Jhingurda 20.06.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 01.08.16 12.08.16 Loaded

556 Jhingurda 20.06.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 01.08.16 16.08.16 Loaded

557 Jhingurda 20.06.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 02.08.16 18.08.16 Loaded

558 Jhingurda 20.06.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 02.08.16 20.08.16 Loaded

559 Jhingurda 20.06.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 03.08.16 22.08.16 Loaded

560 Jhingurda 20.06.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 03.08.16 24.08.16 Loaded

561 Jhingurda 20.06.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 04.08.16 31.08.16 Loaded

562 Jhingurda 20.06.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 04.08.16 01.09.16 Loaded

563 Jhingurda 20.06.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 05.08.16 02.09.16 Loaded

564 Jhingurda 20.06.16 hindalco industries limited HACG 05.08.16 03.09.16 Loaded

565 Jhingurda 20.06.16 hindalco industries limited HACG 06.08.16 04.09.16 Loaded

566 Jhingurda 20.06.16 hindalco industries limited HACG 06.08.16 05.09.16 Loaded

567 Jhingurda 20.06.16 hindalco industries limited HACG 07.08.16 06.09.16 Loaded

568 Jhingurda 22.07.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 26.08.16 07.09.16 Loaded

569 Jhingurda 22.07.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 27.08.16 08.09.16 Loaded

570 Jhingurda 22.07.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 28.08.16 09.09.16 Loaded

571 Jhingurda 22.07.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 29.08.16 10.09.16 Loaded

572 Jhingurda 22.07.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 30.08.16 11.09.16 Loaded

573 Jhingurda 22.07.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 31.08.16 12.09.16 Loaded

574 Jhingurda 22.07.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 01.09.16 13.09.16 Loaded

575 Jhingurda 22.07.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 02.09.16 14.09.16 Loaded

576 Jhingurda 22.07.16 hindalco industries limited HACG 03.09.16 15.09.16 Loaded577 Jhingurda 22.07.16 hindalco industries limited HACG 04.09.16 16.09.16 Loaded578 Jhingurda 22.07.16 hindalco industries limited HACG 05.09.16 18.09.16 Loaded

Page 21: Jhingurda- Status of loading of rakes a/c e-Auction ... · PDF file3 Jhingurda 27.02.13 NTPC LTD SIPAT Gatora Railway Station, Near Rewa, MP 04.04.13 11.04.13 loaded 4 Jhingurda 27.02.13

S.No. ProjectAuction

DateBidder Name

Destination/

Address

Allotment

Date

Loading

Date

Status of

Loading of

Rakes

Jhingurda- Status of loading of rakes a/c e-Auction (Auction-wise Seniority) as on 17.10.2017 (till midnight)

Jhingurda Project

579 Jhingurda 22.07.16 hindalco industries limited HACG 06.09.16 20.09.16 Loaded580 Jhingurda 22.07.16 hindalco industries limited HACG 07.09.16 21.09.16 Loaded581 Jhingurda 22.07.16 IBC IMPEX PRIVATE LIMITED KPV 08.09.16 22.09.16 Loaded582 Jhingurda 22.07.16 IBC IMPEX PRIVATE LIMITED583 Jhingurda 22.07.16 IBC IMPEX PRIVATE LIMITED584 Jhingurda 22.07.16 IBC IMPEX PRIVATE LIMITED

585 Jhingurda 22.07.16 SANGITA SALES PRIVATE LIMITED BEHR 09.09.16 24.09.16 Loaded

586 Jhingurda 22.07.16 SBC MINERALS PVT. LTD. BEHR 10.09.16 25.09.16 Loaded

587 Jhingurda 22.07.16 AWADH ENTERPRISES BEHR 11.09.16 25.09.16 Loaded

588 Jhingurda 19.08.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 23.09.16 27.09.16 Loaded

589 Jhingurda 19.08.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 23.09.16 29.09.16 Loaded

590 Jhingurda 19.08.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 23.09.16 30.09.16 Loaded

591 Jhingurda 19.08.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 24.09.16 16.10.16 Loaded

592 Jhingurda 19.08.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 24.09.16 17.10.16 Loaded

593 Jhingurda 19.08.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 25.09.16 18.10.16 Loaded

594 Jhingurda 19.08.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 25.09.16 19.10.16 Loaded

595 Jhingurda 19.08.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 26.09.16 20.10.16 Loaded

596 Jhingurda 19.08.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 26.09.16 21.10.16 Loaded

597 Jhingurda 19.08.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 27.09.16 22.10.16 Loaded

598 Jhingurda 19.08.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 27.09.16 24.10.16 Loaded

599 Jhingurda 19.08.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 28.09.16 25.10.16 Loaded

600 Jhingurda 19.08.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 28.09.16 26.10.16 Loaded

601 Jhingurda 19.08.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 29.09.16 27.10.16 Loaded

602 Jhingurda 19.08.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 29.09.16 28.10.16 Loaded

603 Jhingurda 19.08.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 02.10.16 29.10.16 Loaded

Rakes cancelled due to non payment of coal value

Page 22: Jhingurda- Status of loading of rakes a/c e-Auction ... · PDF file3 Jhingurda 27.02.13 NTPC LTD SIPAT Gatora Railway Station, Near Rewa, MP 04.04.13 11.04.13 loaded 4 Jhingurda 27.02.13

S.No. ProjectAuction

DateBidder Name

Destination/

Address

Allotment

Date

Loading

Date

Status of

Loading of

Rakes

Jhingurda- Status of loading of rakes a/c e-Auction (Auction-wise Seniority) as on 17.10.2017 (till midnight)

Jhingurda Project

604 Jhingurda 19.08.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 03.10.16 30.10.16 Loaded

605 Jhingurda 19.08.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 18.10.16 31.10.16 Loaded

606 Jhingurda 19.08.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 18.10.16 04.11.16 Loaded

607 Jhingurda 19.08.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 19.10.16 05.11.16 Loaded

608 Jhingurda 19.08.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 19.10.16 06.11.16 Loaded

609 Jhingurda 19.08.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 20.10.16 07.11.16 Loaded

610 Jhingurda 19.08.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 20.10.16 08.11.16 Loaded

611 Jhingurda 19.08.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 21.10.16 09.11.16 Loaded

612 Jhingurda 19.08.16

HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 21.10.16 10.11.16 Loaded

613 Jhingurda 19.08.16 AWADH ENTERPRISES BEHR 22.10.16 02.11.16 Loaded614 Jhingurda 19.08.16 Gallantt Ispat Limited MGIS 22.10.16 03.11.16 Loaded

615 Jhingurda 19.08.16 AWADH ENTERPRISES BEHR 23.10.16 12.11.16 Loaded

616 Jhingurda 21.09.16GODAVARI COMMODITIES

LIMITEDSLBN 10.11.16 13.11.16

Loaded

617 Jhingurda 21.09.16GODAVARI COMMODITIES

LIMITED SLBN 10.11.16 14.11.16 Loaded

618 Jhingurda 21.09.16GODAVARI COMMODITIES

LIMITEDSLBN 11.11.16 15.11.16 Loaded

619 Jhingurda 21.09.16GODAVARI COMMODITIES

LIMITEDSLBN 11.11.16 16.11.16 Loaded

620 Jhingurda 21.09.16 GODAVARI COMMODITIES

LIMITEDSLBN 11.11.16 17.11.16 Loaded

621 Jhingurda 21.09.16 INDIA GLYCOLS LIMITED KPV 12.11.16 18.11.16 Loaded

622 Jhingurda 21.09.16 INDIA GLYCOLS LIMITED KPV 12.11.16 19.11.16 Loaded

623 Jhingurda 21.09.16 INDIA GLYCOLS LIMITED KPV 13.11.16 21.11.16 Loaded

624 Jhingurda 21.09.16 INDIA GLYCOLS LIMITED KPV 13.11.16 22.11.16 Loaded625 Jhingurda 21.09.16 INDIA GLYCOLS LIMITED KPV 14.11.16 23.11.16 Loaded626 Jhingurda 21.09.16 INDIA GLYCOLS LIMITED KPV 14.11.16 24.11.16 Loaded627 Jhingurda 21.09.16 AWADH ENTERPRISES BEHR 15.11.16 25.11.16 Loaded628 Jhingurda 21.09.16 AWADH ENTERPRISES BEHR 15.11.16 26.11.16 Loaded

629 Jhingurda 21.09.16M/S SANGITA SALES PRIVATE

LIMITEDBEHR 16.11.16 27.11.16 Loaded

630 Jhingurda 21.09.16M/S SANGITA SALES PRIVATE

LIMITEDBEHR 16.11.16 29.11.16 Loaded

631 Jhingurda 21.09.16HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 22.11.16 30.11.16 Loaded

632 Jhingurda 21.09.16HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 22.11.16 02.12.16 Loaded

Page 23: Jhingurda- Status of loading of rakes a/c e-Auction ... · PDF file3 Jhingurda 27.02.13 NTPC LTD SIPAT Gatora Railway Station, Near Rewa, MP 04.04.13 11.04.13 loaded 4 Jhingurda 27.02.13

S.No. ProjectAuction

DateBidder Name

Destination/

Address

Allotment

Date

Loading

Date

Status of

Loading of

Rakes

Jhingurda- Status of loading of rakes a/c e-Auction (Auction-wise Seniority) as on 17.10.2017 (till midnight)

Jhingurda Project

633 Jhingurda 21.09.16HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 23.11.16 03.12.16 Loaded

634 Jhingurda 21.09.16HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 23.11.16 04.12.16 Loaded

635 Jhingurda 21.09.16HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 23.11.16 06.12.16 Loaded

636 Jhingurda 26.10.16MAHAVIR COAL RESOURCES PVT.

LTD.RPD 27.11.16 07.12.16 Loaded

637 Jhingurda 26.10.16Jaiprakash Associates Ltd. (Unit:

Jaypee Churk Industrial Complex)JPCC 28.11.16 08.12.16 Loaded

638 Jhingurda 26.10.16Jaiprakash Associates Ltd. (Unit:

Jaypee Churk Industrial Complex)JPCC 29.11.16 09.12.16 Loaded

639 Jhingurda 26.10.16Jaiprakash Associates Ltd. (Unit:

Jaypee Churk Industrial Complex)JPCC 29.11.16 10.12.16 Loaded

640 Jhingurda 26.10.16Jaiprakash Associates Ltd. (Unit:

Jaypee Churk Industrial Complex)JPCC 30.11.16 11.12.16 Loaded

641 Jhingurda 26.10.16Jaiprakash Associates Ltd. (Unit:

Jaypee Churk Industrial Complex)JPCC 30.11.16 12.12.16 Loaded

642 Jhingurda 26.10.16Jaiprakash Associates Ltd. (Unit:

Jaypee Churk Industrial Complex)JPCC 01.12.16 14.12.16 Loaded

643 Jhingurda 26.10.16Jaiprakash Associates Ltd. (Unit:

Jaypee Churk Industrial Complex)JPCC 01.12.16 15.12.16 Loaded

644 Jhingurda 26.10.16Jaiprakash Associates Ltd. (Unit:

Jaypee Churk Industrial Complex)JPCC 02.12.16 16.12.16 Loaded

645 Jhingurda 26.10.16Jaiprakash Associates Ltd. (Unit:

Jaypee Churk Industrial Complex)JPCC 02.12.16 17.12.16 Loaded

646 Jhingurda 26.10.16Jaiprakash Associates Ltd. (Unit:

Jaypee Churk Industrial Complex)JPCC 03.12.16 18.12.16 Loaded

647 Jhingurda 26.10.16 INDIA GLYCOLS LIMITED KPV 03.12.16 19.12.16 Loaded648 Jhingurda 26.10.16 INDIA GLYCOLS LIMITED KPV 04.12.16 20.12.16 Loaded649 Jhingurda 26.10.16 INDIA GLYCOLS LIMITED KPV 04.12.16 21.12.16 Loaded650 Jhingurda 26.10.16 INDIA GLYCOLS LIMITED KPV 05.12.16 23.12.16 Loaded651 Jhingurda 26.10.16 INDIA GLYCOLS LIMITED KPV 05.12.16 24.12.16 Loaded652 Jhingurda 26.10.16 INDIA GLYCOLS LIMITED KPV 06.12.16 25.12.16 Loaded653 Jhingurda 26.10.16 INDIA GLYCOLS LIMITED KPV 06.12.16 26.12.16 Loaded654 Jhingurda 26.10.16 Gallantt Ispat Limited GLI 07.12.16 28.12.16 Loaded655 Jhingurda 26.10.16 Gallantt Ispat Limited GLI 07.12.16 29.12.16 Loaded656 Jhingurda 26.10.16 AWADH ENTERPRISES BEHR 08.12.16 30.12.16 Loaded657 Jhingurda 26.10.16 PODDAR COAL SALES BEHR 08.12.16 31.12.16 Loaded658 Jhingurda 26.10.16 Arihant Coal Corporation KPV 09.12.16 02.01.17 Loaded659 Jhingurda 26.10.16 MAIHAR CEMENT MSSG 09.12.16 03.01.17 Loaded

660 Jhingurda 26.10.16 AWADH ENTERPRISES BEHR 10.12.16 04.01.17 Loaded

661 Jhingurda 24.11.16Jaiprakash Associates Ltd. (Unit:

Jaypee Churk Industrial Complex)JPCC 16.12.16 05.01.17 Loaded

Page 24: Jhingurda- Status of loading of rakes a/c e-Auction ... · PDF file3 Jhingurda 27.02.13 NTPC LTD SIPAT Gatora Railway Station, Near Rewa, MP 04.04.13 11.04.13 loaded 4 Jhingurda 27.02.13

S.No. ProjectAuction

DateBidder Name

Destination/

Address

Allotment

Date

Loading

Date

Status of

Loading of

Rakes

Jhingurda- Status of loading of rakes a/c e-Auction (Auction-wise Seniority) as on 17.10.2017 (till midnight)

Jhingurda Project

662 Jhingurda 24.11.16Jaiprakash Associates Ltd. (Unit:

Jaypee Churk Industrial Complex)JPCC 16.12.16 06.01.17 Loaded

663 Jhingurda 24.11.16Jaiprakash Associates Ltd. (Unit:

Jaypee Churk Industrial Complex)JPCC 17.12.16 07.01.17 Loaded

664 Jhingurda 24.11.16Jaiprakash Associates Ltd. (Unit:

Jaypee Churk Industrial Complex)JPCC 17.12.16 09.01.17 Loaded

665 Jhingurda 24.11.16Jaiprakash Associates Ltd. (Unit:

Jaypee Churk Industrial Complex)JPCC 18.12.16 10.01.17 Loaded

666 Jhingurda 24.11.16 INDIA GLYCOLS LIMITED KPV 18.12.16 11.01.17 Loaded667 Jhingurda 24.11.16 INDIA GLYCOLS LIMITED KPV 19.12.16 13.01.17 Loaded668 Jhingurda 24.11.16 INDIA GLYCOLS LIMITED KPV 19.12.16 14.01.17 Loaded669 Jhingurda 24.11.16 INDIA GLYCOLS LIMITED KPV 20.12.16 16.01.17 Loaded

670 Jhingurda 24.11.16 INDIA GLYCOLS LIMITED KPV 20.12.16 17.01.17 Loaded

671 Jhingurda 26.12.16NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 13.01.17 18.01.17 Loaded

672 Jhingurda 26.12.16NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 14.01.17 20.01.17 Loaded

673 Jhingurda 26.12.16NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 15.01.17 21.01.17 Loaded

674 Jhingurda 26.12.16NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 16.01.17 22.01.17 Loaded

675 Jhingurda 26.12.16NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 17.01.17 23.01.17 Loaded

676 Jhingurda 26.12.16NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 18.01.17 24.01.17 Loaded

677 Jhingurda 26.12.16NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 19.01.17 25.01.17 Loaded

678 Jhingurda 26.12.16 INDIA GLYCOLS LIMITED KPV 20.01.17 26.01.17 Loaded679 Jhingurda 26.12.16 INDIA GLYCOLS LIMITED KPV 21.01.17 27.01.17 Loaded680 Jhingurda 26.12.16 INDIA GLYCOLS LIMITED KPV 22.01.17 28.01.17 Loaded681 Jhingurda 26.12.16 INDIA GLYCOLS LIMITED KPV 23.01.17 29.01.17 Loaded682 Jhingurda 26.12.16 INDIA GLYCOLS LIMITED KPV 24.01.17 30.01.17 Loaded683 Jhingurda 26.12.16 INDIA GLYCOLS LIMITED KPV 25.01.17 31.01.17 Loaded684 Jhingurda 26.12.16 INDIA GLYCOLS LIMITED KPV 26.01.17 01.02.17 Loaded

685 Jhingurda 26.12.16NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 27.01.17 02.02.17 Loaded

686 Jhingurda 26.12.16NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 28.01.17 04.02.17 Loaded

687 Jhingurda 26.12.16NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 29.01.17 05.02.17 Loaded

688 Jhingurda 26.12.16NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 30.01.17 06.02.17 Loaded

689 Jhingurda 26.12.16NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 31.01.17 19.02.17 Loaded

690 Jhingurda 26.12.16NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 01.02.17 20.02.17 Loaded

691 Jhingurda 26.12.16NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 02.02.17 21.02.17 Loaded

692 Jhingurda 26.12.16NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 03.02.17 23.02.17 Loaded

693 Jhingurda 26.12.16NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 04.02.17 23.02.17 Loaded

694 Jhingurda 26.12.16NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 05.02.17 25.02.17 Loaded

Page 25: Jhingurda- Status of loading of rakes a/c e-Auction ... · PDF file3 Jhingurda 27.02.13 NTPC LTD SIPAT Gatora Railway Station, Near Rewa, MP 04.04.13 11.04.13 loaded 4 Jhingurda 27.02.13

S.No. ProjectAuction

DateBidder Name

Destination/

Address

Allotment

Date

Loading

Date

Status of

Loading of

Rakes

Jhingurda- Status of loading of rakes a/c e-Auction (Auction-wise Seniority) as on 17.10.2017 (till midnight)

Jhingurda Project

695 Jhingurda 26.12.16NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 06.02.17 28.02.17 Loaded

696 Jhingurda 26.12.16NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 07.02.17 02.03.17 Loaded

697 Jhingurda 26.12.16NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 07.02.17 03.03.17 Loaded

698 Jhingurda 26.12.16NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 07.02.17 04.03.17 Loaded

699 Jhingurda 26.12.16NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 07.02.17 05.03.17 Loaded

700 Jhingurda 26.12.16NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 08.02.17 11.03.17 Loaded

701 Jhingurda 26.12.16NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 08.02.17 12.03.17 Loaded

702 Jhingurda 26.12.16NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 09.02.17 13.03.17 Loaded

703 Jhingurda 26.12.16NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 09.02.17 17.03.17 Loaded

704 Jhingurda 26.12.16NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 10.02.17 18.03.17 Loaded

705 Jhingurda 26.12.16NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 10.02.17 19.03.17 Loaded

706 Jhingurda 20.01.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 01.03.17 24.03.17 Loaded

707 Jhingurda 20.01.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 01.03.17 25.03.17 Loaded

708 Jhingurda 20.01.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 02.03.14 26.03.17 Loaded

709 Jhingurda 20.01.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 02.03.17 27.03.17 Loaded

710 Jhingurda 20.01.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 03.03.17 31.03.17 Loaded

711 Jhingurda 20.01.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 03.03.17 16.04.17 Loaded

712 Jhingurda 20.01.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 04.03.17 18.04.17 Loaded

713 Jhingurda 20.01.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 04.03.17 22.04.17 Loaded

714 Jhingurda 20.01.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 05.03.17 26.04.17 Loaded

715 Jhingurda 20.01.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 05.03.17 27.04.17 Loaded

716 Jhingurda 20.01.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 06.03.17 28.04.17 Loaded

717 Jhingurda 20.01.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 06.03.17 29.04.17 Loaded

718 Jhingurda 20.01.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 07.03.17 30.04.17 Loaded

719 Jhingurda 20.01.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 07.03.17 05.05.17 Loaded

720 Jhingurda 20.01.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 08.03.17 06.05.17 Loaded

721 Jhingurda 20.01.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 08.03.17 08.05.17 Loaded

722 Jhingurda 20.01.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 09.03.17 09.05.17 Loaded

723 Jhingurda 20.01.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 09.03.17 11.05.17 Loaded

724 Jhingurda 20.01.17 INDIA GLYCOLS LIMITED KPV 10.03.17 14.03.17 Loaded

Page 26: Jhingurda- Status of loading of rakes a/c e-Auction ... · PDF file3 Jhingurda 27.02.13 NTPC LTD SIPAT Gatora Railway Station, Near Rewa, MP 04.04.13 11.04.13 loaded 4 Jhingurda 27.02.13

S.No. ProjectAuction

DateBidder Name

Destination/

Address

Allotment

Date

Loading

Date

Status of

Loading of

Rakes

Jhingurda- Status of loading of rakes a/c e-Auction (Auction-wise Seniority) as on 17.10.2017 (till midnight)

Jhingurda Project

725 Jhingurda 20.01.17 INDIA GLYCOLS LIMITED KPV 10.03.17 15.03.17 Loaded726 Jhingurda 20.01.17 INDIA GLYCOLS LIMITED KPV 11.03.17 16.03.17 Loaded727 Jhingurda 20.01.17 INDIA GLYCOLS LIMITED KPV 11.03.17 19.03.17 Loaded

728 Jhingurda 20.01.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 12.03.17 13.05.17 Loaded

729 Jhingurda 20.01.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 12.03.17 14.05.17 Loaded

730 Jhingurda 20.01.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 13.03.17 15.05.17 Loaded

731 Jhingurda 20.01.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 13.03.17 16.05.17 Loaded

732 Jhingurda 20.01.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 14.03.17 17.05.17 Loaded

733 Jhingurda 20.01.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 14.03.17 18.05.17 Loaded

734 Jhingurda 20.01.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 14.03.17 21.05.17 Loaded

735 Jhingurda 20.01.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 15.03.17 22.05.17 Loaded

736 Jhingurda 24.02.17 Jaiprakash Associates Ltd. (Unit:

Jaypee Churk Industrial Complex)

JPCC 18.04.17 19.04.17 Loaded

737 Jhingurda 24.02.17 Jaiprakash Associates Ltd. (Unit:

Jaypee Churk Industrial Complex)

JPCC 18.04.17 20.04.17 Loaded

738 Jhingurda 24.02.17 INDIA GLYCOLS LIMITED KPV 19.04.17 21.04.17 Loaded

739 Jhingurda 24.02.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 20.04.17 23.05.17 Loaded

740 Jhingurda 24.02.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 20.04.17 24.05.17 Loaded

741 Jhingurda 24.02.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 21.04.17 25.05.17 Loaded

742 Jhingurda 24.02.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 21.04.17 26.05.17 Loaded

743 Jhingurda 24.02.17 Gallantt Ispat Limited

744 Jhingurda 24.02.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 22.04.17 29.05.17 Loaded

745 Jhingurda 24.02.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 22.04.17 30.05.17 Loaded

746 Jhingurda 24.02.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 23.04.17 31.05.17 Loaded

747 Jhingurda 24.02.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 23.04.17 01.06.17 Loaded

748 Jhingurda 24.02.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 24.04.17 02.06.17 Loaded

749 Jhingurda 24.02.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 24.04.17 04.06.17 Loaded

750 Jhingurda 24.02.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 25.04.17 05.06.17 Loaded

751 Jhingurda 24.02.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 25.04.17 06.06.17 Loaded

752 Jhingurda 24.02.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 26.04.17 07.06.17 Loaded

753 Jhingurda 24.02.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 26.04.17 08.06.17 Loaded

754 Jhingurda 24.02.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 26.04.17 09.06.17 Loaded

755 Jhingurda 24.02.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 26.04.17 10.06.17 Loaded

Rake cancelled due to non payment of coal value

Page 27: Jhingurda- Status of loading of rakes a/c e-Auction ... · PDF file3 Jhingurda 27.02.13 NTPC LTD SIPAT Gatora Railway Station, Near Rewa, MP 04.04.13 11.04.13 loaded 4 Jhingurda 27.02.13

S.No. ProjectAuction

DateBidder Name

Destination/

Address

Allotment

Date

Loading

Date

Status of

Loading of

Rakes

Jhingurda- Status of loading of rakes a/c e-Auction (Auction-wise Seniority) as on 17.10.2017 (till midnight)

Jhingurda Project

756 Jhingurda 17.03.17 INDIA GLYCOLS LIMITED KPV 27.04.17 02.05.17 Loaded757 Jhingurda 17.03.17 INDIA GLYCOLS LIMITED KPV 27.04.17 07.05.17 Loaded758 Jhingurda 17.03.17 INDIA GLYCOLS LIMITED KPV 28.04.17 27.05.17 Loaded759 Jhingurda 17.03.17 INDIA GLYCOLS LIMITED KPV 28.04.17 28.05.17 Loaded760 Jhingurda 17.03.17 INDIA GLYCOLS LIMITED KPV 29.04.17 11.06.17 Loaded761 Jhingurda 17.03.17 Gallantt Ispat Limited MGIS 30.04.17 12.06.17 Loaded

762 Jhingurda 17.03.17 Jaiprakash Associates Ltd. (Unit:

Jaypee Churk Industrial Complex)

JPCC 30.04.17 13.06.17 Loaded

763 Jhingurda 17.03.17HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 03.05.17 14.06.17 Loaded

764 Jhingurda 17.03.17HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 03.05.17 15.06.17 Loaded

765 Jhingurda 17.03.17HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 04.05.17 16.06.17 Loaded

766 Jhingurda 17.03.17HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 04.05.17 17.06.17 Loaded

767 Jhingurda 17.03.17HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 05.05.17 18.06.17 Loaded

768 Jhingurda 17.03.17HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 05.05.17 19.06.17 Loaded

769 Jhingurda 17.03.17HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 06.05.17 20.06.17 Loaded

770 Jhingurda 17.03.17HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 06.05.17 21.06.17 Loaded

771 Jhingurda 17.03.17HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 07.05.17 22.06.17 Loaded

772 Jhingurda 17.03.17HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 07.05.17 23.06.17 Loaded

773 Jhingurda 17.03.17HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 08.05.17 24.06.17 Loaded

774 Jhingurda 17.03.17HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 08.05.17 25.06.17 Loaded

775 Jhingurda 17.03.17HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

HIMB 09.05.17 26.06.17 Loaded

776 Jhingurda 15.05.17 Maihar Cement MSSG 18.06.17 27.06.17 Loaded777 Jhingurda 15.05.17 Maihar Cement MSSG 19.06.17 28.06.17 Loaded778 Jhingurda 15.05.17 Maihar Cement MSSG 20.06.17 29.06.17 Loaded779 Jhingurda 15.05.17 Maihar Cement MSSG 21.06.17 30.06.17 Loaded780 Jhingurda 15.05.17 Maihar Cement MSSG 22.06.17 01.07.17 Loaded781 Jhingurda 15.05.17 INDIA GLYCOLS LIMITED KPV 23.06.17 02.07.17 Loaded782 Jhingurda 15.05.17 INDIA GLYCOLS LIMITED KPV 24.06.17 03.07.17 Loaded783 Jhingurda 15.05.17 Arihant Coal Corporation YJUD 25.06.17 04.07.17 Loaded784 Jhingurda 15.05.17 GANGOTRI TRADING CO. KPV 26.06.17 05.07.17 Loaded

Page 28: Jhingurda- Status of loading of rakes a/c e-Auction ... · PDF file3 Jhingurda 27.02.13 NTPC LTD SIPAT Gatora Railway Station, Near Rewa, MP 04.04.13 11.04.13 loaded 4 Jhingurda 27.02.13

S.No. ProjectAuction

DateBidder Name

Destination/

Address

Allotment

Date

Loading

Date

Status of

Loading of

Rakes

Jhingurda- Status of loading of rakes a/c e-Auction (Auction-wise Seniority) as on 17.10.2017 (till midnight)

Jhingurda Project

785 Jhingurda 15.05.17

Jaiprakash Associates Ltd.

(Unit:Jaypee Churk Industrial

Complex)JPCC 27.06.17 06.07.17 Loaded

786 Jhingurda 15.05.17

Jaiprakash Associates Ltd.

(Unit:Jaypee Churk Industrial

Complex)JPCC 28.06.17 07.07.17 Loaded

787 Jhingurda 15.05.17

Jaiprakash Associates Ltd.

(Unit:Jaypee Churk Industrial

Complex)JPCC 29.06.17 09.07.17 Loaded

788 Jhingurda 15.05.17 Hindalco Industries Limited KRSL 02.07.17 16.07.17 Loaded789 Jhingurda 15.05.17 Hindalco Industries Limited KRSL 03.07.17 17.07.17 Loaded790 Jhingurda 15.05.17 Hindalco Industries Limited KRSL 04.07.17 18.07.17 Loaded791 Jhingurda 15.05.17 Hindalco Industries Limited KRSL 05.07.17 19.07.17 Loaded792 Jhingurda 15.05.17 Hindalco Industries Limited KRSL 06.07.17 20.07.17 Loaded793 Jhingurda 15.05.17 Hindalco Industries Limited KRSL 07.07.17 21.07.17 Loaded794 Jhingurda 15.05.17 Hindalco Industries Limited KRSL 08.07.17 22.07.17 Loaded

795 Jhingurda 15.05.17 Hindalco Industries Limited KRSL 10.07.17 23.07.17 Loaded

796 Jhingurda 14.06.17

Jaiprakash Associates Ltd.

(Unit:Jaypee Churk Industrial

Complex)JPCC 13.07.17 14.07.17 Loaded

797 Jhingurda 14.06.17

Jaiprakash Associates Ltd.

(Unit:Jaypee Churk Industrial

Complex)JPCC 13.07.17 15.07.17 Loaded

798 Jhingurda 14.06.17

Jaiprakash Associates Ltd.

(Unit:Jaypee Churk Industrial

Complex)JPCC 14.07.17 24.07.17 Loaded

799 Jhingurda 14.06.17

Jaiprakash Associates Ltd.

(Unit:Jaypee Churk Industrial

Complex)JPCC 15.07.17 25.07.17 Loaded

800 Jhingurda 14.06.17

Jaiprakash Associates Ltd.

(Unit:Jaypee Churk Industrial

Complex)JPCC 15.07.17 26.07.17 Loaded

801 Jhingurda 14.06.17

Jaiprakash Associates Ltd.

(Unit:Jaypee Churk Industrial

Complex)JPCC 15.07.17 27.07.17 Loaded

802 Jhingurda 14.06.17

Jaiprakash Associates Ltd.

(Unit:Jaypee Churk Industrial

Complex)JPCC 16.07.17 28.07.17 Loaded

803 Jhingurda 14.06.17

Jaiprakash Associates Ltd.

(Unit:Jaypee Churk Industrial

Complex)JPCC 16.07.17 29.07.17 Loaded

804 Jhingurda 14.06.17 INDIA GLYCOLS LIMITED KPV 17.07.17 30.07.17 Loaded805 Jhingurda 14.06.17 INDIA GLYCOLS LIMITED KPV 17.07.17 31.07.17 Loaded806 Jhingurda 14.06.17 INDIA GLYCOLS LIMITED KPV 18.07.17 01.08.17 Loaded807 Jhingurda 14.06.17 INDIA GLYCOLS LIMITED KPV 19.07.17 02.08.17 Loaded808 Jhingurda 14.06.17 INDIA GLYCOLS LIMITED KPV 20.07.17 03.08.17 Loaded809 Jhingurda 14.06.17 INDIA GLYCOLS LIMITED KPV 21.07.17 05.08.17 Loaded810 Jhingurda 14.06.17 INDIA GLYCOLS LIMITED KPV 22.07.17 07.08.17 Loaded811 Jhingurda 14.06.17 Maihar Cement MSSG 23.07.17 08.08.17 Loaded812 Jhingurda 14.06.17 Maihar Cement MSSG 24.07.17 09.08.17 Loaded813 Jhingurda 14.06.17 Maihar Cement MSSG 25.07.17 10.08.17 Loaded814 Jhingurda 14.06.17 Maihar Cement MSSG 26.07.17 11.08.17 Loaded815 Jhingurda 14.06.17 Maihar Cement MSSG 27.07.17 12.08.17 Loaded

816 Jhingurda 14.06.17

Jaiprakash Associates Ltd.

(Unit:Jaypee Churk Industrial

Complex)JPCC 28.07.17 13.08.17 Loaded

817 Jhingurda 14.06.17

Jaiprakash Associates Ltd.

(Unit:Jaypee Churk Industrial

Complex)JPCC 29.07.17 14.08.17 Loaded

Page 29: Jhingurda- Status of loading of rakes a/c e-Auction ... · PDF file3 Jhingurda 27.02.13 NTPC LTD SIPAT Gatora Railway Station, Near Rewa, MP 04.04.13 11.04.13 loaded 4 Jhingurda 27.02.13

S.No. ProjectAuction

DateBidder Name

Destination/

Address

Allotment

Date

Loading

Date

Status of

Loading of

Rakes

Jhingurda- Status of loading of rakes a/c e-Auction (Auction-wise Seniority) as on 17.10.2017 (till midnight)

Jhingurda Project

818 Jhingurda 14.06.17 Swastik Coal Suppliers AYODHYA 30.07.17 15.08.17 Loaded

819 Jhingurda 14.06.17HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

KRSL 31.07.17 16.08.17 Loaded

820 Jhingurda 14.06.17HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

KRSL 01.08.17 17.08.17 Loaded

821 Jhingurda 14.06.17HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

KRSL 02.08.17 18.08.17 Loaded

822 Jhingurda 14.06.17HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

KRSL 03.08.17 19.08.17 Loaded

823 Jhingurda 14.06.17HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

KRSL 04.08.17 20.08.17 Loaded

824 Jhingurda 14.06.17HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

KRSL 05.08.17 21.08.17 Loaded

825 Jhingurda 14.06.17HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

KRSL 06.08.17 22.08.17 Loaded

826 Jhingurda 14.06.17HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

KRSL 07.08.17 23.08.17 Loaded

827 Jhingurda 14.06.17HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

KRSL 08.08.17 24.08.17 Loaded

828 Jhingurda 14.06.17HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

KRSL 09.08.17 25.08.17 Loaded

829 Jhingurda 14.06.17HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

KRSL 10.08.17 27.08.17 Loaded

830 Jhingurda 14.06.17HINDALCO INDUSTRIES

LIMITED,MAHAN ALUMINIUM

PROJECT

KRSL 11.08.17 28.08.17 Loaded

831 Jhingurda 26.07.17 INDIA GLYCOLS LIMITED IGLK 24.08.17 29.08.17 Loaded832 Jhingurda 26.07.17 INDIA GLYCOLS LIMITED IGLK 25.08.17 30.08.17 Loaded833 Jhingurda 26.07.17 INDIA GLYCOLS LIMITED IGLK 26.08.17 01.09.17 Loaded834 Jhingurda 26.07.17 INDIA GLYCOLS LIMITED IGLK 27.08.17 02.09.17 Loaded835 Jhingurda 26.07.17 INDIA GLYCOLS LIMITED IGLK 28.08.17 03.09.17 Loaded

836 Jhingurda 26.07.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 29.08.17 04.09.17 Loaded

837 Jhingurda 26.07.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 30.08.17 05.09.17 Loaded

838 Jhingurda 26.07.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 31.08.17 06.09.17 Loaded

839 Jhingurda 26.07.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 01.09.17 07.09.17 Loaded

840 Jhingurda 26.07.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 02.09.17 10.09.17 Loaded

841 Jhingurda 26.07.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 03.09.17 11.09.17 Loaded

842 Jhingurda 26.07.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 04.09.17 12.09.17 Loaded

843 Jhingurda 26.07.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 05.09.17 13.09.17 Loaded

Page 30: Jhingurda- Status of loading of rakes a/c e-Auction ... · PDF file3 Jhingurda 27.02.13 NTPC LTD SIPAT Gatora Railway Station, Near Rewa, MP 04.04.13 11.04.13 loaded 4 Jhingurda 27.02.13

S.No. ProjectAuction

DateBidder Name

Destination/

Address

Allotment

Date

Loading

Date

Status of

Loading of

Rakes

Jhingurda- Status of loading of rakes a/c e-Auction (Auction-wise Seniority) as on 17.10.2017 (till midnight)

Jhingurda Project

844 Jhingurda 26.07.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 06.09.17 13.09.17 Loaded

845 Jhingurda 26.07.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 07.09.17 15.09.17 Loaded

846 Jhingurda 26.07.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 08.09.17 16.09.17 Loaded

847 Jhingurda 26.07.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 09.09.17 17.09.17 Loaded

848 Jhingurda 26.07.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 10.09.17 18.09.17 Loaded

849 Jhingurda 26.07.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 11.09.17 22.09.17 Loaded

850 Jhingurda 26.07.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 12.09.17 23.09.17 Loaded

851 Jhingurda 26.07.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 13.09.17 24.09.17 Loaded

852 Jhingurda 26.07.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 14.09.17 25.09.17 Loaded

853 Jhingurda 26.07.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 15.09.17 26.09.17 Loaded

854 Jhingurda 26.07.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 16.09.17 27.09.17 Loaded

855 Jhingurda 26.07.17 Sanjay Trading Company

856 Jhingurda 26.07.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 17.09.17 29.09.17 Loaded

857 Jhingurda 26.07.17Jaiprakash Associates Ltd. (Unit:

Jaypee Churk Industrial Complex)

858 Jhingurda 26.07.17Jaiprakash Associates Ltd. (Unit:

Jaypee Churk Industrial Complex)

859 Jhingurda 26.07.17Jaiprakash Associates Ltd. (Unit:

Jaypee Churk Industrial Complex)

860 Jhingurda 26.07.17Jaiprakash Associates Ltd. (Unit:

Jaypee Churk Industrial Complex)

861 Jhingurda 31.08.17 INDIA GLYCOLS LIMITED KPV 21.09.17 04.10.17 Loaded

862 Jhingurda 31.08.17

Jaiprakash Associates Ltd.

(Unit:Jaypee Churk Industrial

Complex)

JPCC 21.09.17 08.10.17 Loaded

863 Jhingurda 31.08.17

Jaiprakash Associates Ltd.

(Unit:Jaypee Churk Industrial

Complex)

JPCC 22.09.17 11.10.17 Loaded

864 Jhingurda 31.08.17

Jaiprakash Associates Ltd.

(Unit:Jaypee Churk Industrial

Complex)

JPCC 23.09.17 13.10.17 Loaded

865 Jhingurda 31.08.17

Jaiprakash Associates Ltd.

(Unit:Jaypee Churk Industrial

Complex)

JPCC 24.09.17

866 Jhingurda 31.08.17

Jaiprakash Associates Ltd.

(Unit:Jaypee Churk Industrial

Complex)

JPCC 25.09.17

867 Jhingurda 31.08.17

Jaiprakash Associates Ltd.

(Unit:Jaypee Churk Industrial

Complex)

JPCC 26.09.17

868 Jhingurda 31.08.17

Jaiprakash Associates Ltd.

(Unit:Jaypee Churk Industrial

Complex)

JPCC 27.09.17

Rakes cancelled by customer due to non payment of coal

value

Rake cancelled by the customer

Page 31: Jhingurda- Status of loading of rakes a/c e-Auction ... · PDF file3 Jhingurda 27.02.13 NTPC LTD SIPAT Gatora Railway Station, Near Rewa, MP 04.04.13 11.04.13 loaded 4 Jhingurda 27.02.13

S.No. ProjectAuction

DateBidder Name

Destination/

Address

Allotment

Date

Loading

Date

Status of

Loading of

Rakes

Jhingurda- Status of loading of rakes a/c e-Auction (Auction-wise Seniority) as on 17.10.2017 (till midnight)

Jhingurda Project

Jhingurda 31.08.17

Jaiprakash Associates Ltd.

(Unit:Jaypee Churk Industrial

Complex)

JPCC 28.09.17

870 Jhingurda 31.08.17

Jaiprakash Associates Ltd.

(Unit:Jaypee Churk Industrial

Complex)

JPCC 29.09.17

871 Jhingurda 31.08.17

Jaiprakash Associates Ltd.

(Unit:Jaypee Churk Industrial

Complex)

JPCC 30.09.17

872 Jhingurda 31.08.17 Gallantt Ispat Limited MGIS 02.10.17873 Jhingurda 31.08.17 Gallantt Ispat Limited MGIS 02.10.17874 Jhingurda 31.08.17 Gallantt Ispat Limited MGIS 03.10.17

875 Jhingurda 31.08.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 04.10.17

876 Jhingurda 31.08.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 05.10.17

877 Jhingurda 31.08.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 06.10.17

878 Jhingurda 31.08.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 07.10.17

879 Jhingurda 31.08.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 08.10.17

880 Jhingurda 31.08.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 09.10.17

881 Jhingurda 31.08.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 10.10.17

882 Jhingurda 31.08.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 11.10.17

883 Jhingurda 31.08.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 12.10.17

884 Jhingurda 31.08.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 13.10.17

885 Jhingurda 31.08.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 14.10.17

886 Jhingurda 31.08.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 15.10.17

887 Jhingurda 31.08.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 16.10.17

888 Jhingurda 31.08.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 17.10.17

889 Jhingurda 31.08.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 18.10.17

890 Jhingurda 31.08.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD 19.10.17

891 Jhingurda 31.08.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD

892 Jhingurda 31.08.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD

893 Jhingurda 31.08.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD

894 Jhingurda 31.08.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD

895 Jhingurda 31.08.17NATIONAL ALUMINIUM

COMPANY LIMITEDNLOD

896 Jhingurda 22.09.17 INDIA GLYCOLS LIMITED897 Jhingurda 22.09.17 INDIA GLYCOLS LIMITED898 Jhingurda 22.09.17 INDIA GLYCOLS LIMITED899 Jhingurda 22.09.17 INDIA GLYCOLS LIMITED900 Jhingurda 22.09.17 INDIA GLYCOLS LIMITED

Page 32: Jhingurda- Status of loading of rakes a/c e-Auction ... · PDF file3 Jhingurda 27.02.13 NTPC LTD SIPAT Gatora Railway Station, Near Rewa, MP 04.04.13 11.04.13 loaded 4 Jhingurda 27.02.13

S.No. ProjectAuction

DateBidder Name

Destination/

Address

Allotment

Date

Loading

Date

Status of

Loading of

Rakes

Jhingurda- Status of loading of rakes a/c e-Auction (Auction-wise Seniority) as on 17.10.2017 (till midnight)

Jhingurda Project

901 Jhingurda 22.09.17Jaiprakash Associates Ltd. (Unit:

Jaypee Churk Industrial Complex)

902 Jhingurda 22.09.17Jaiprakash Associates Ltd. (Unit:

Jaypee Churk Industrial Complex)

903 Jhingurda 22.09.17Jaiprakash Associates Ltd. (Unit:

Jaypee Churk Industrial Complex)

904 Jhingurda 22.09.17 MAIHAR CEMENT905 Jhingurda 22.09.17 MAIHAR CEMENT906 Jhingurda 22.09.17 MAIHAR CEMENT

907 Jhingurda 22.09.17Jaiprakash Associates Ltd. (Unit:

Jaypee Churk Industrial Complex)

908 Jhingurda 22.09.17Jaiprakash Associates Ltd. (Unit:

Jaypee Churk Industrial Complex)

909 Jhingurda 22.09.17Jaiprakash Associates Ltd. (Unit:

Jaypee Churk Industrial Complex)

910 Jhingurda 22.09.17Jaiprakash Associates Ltd. (Unit:

Jaypee Churk Industrial Complex)

911 Jhingurda 22.09.17Jaiprakash Associates Ltd. (Unit:

Jaypee Churk Industrial Complex)

912 Jhingurda 22.09.17Jaiprakash Associates Ltd. (Unit:

Jaypee Churk Industrial Complex)

913 Jhingurda 22.09.17Jaiprakash Associates Ltd. (Unit:

Jaypee Churk Industrial Complex)

914 Jhingurda 22.09.17NATIONAL ALUMINIUM

COMPANY LIMITED

915 Jhingurda 22.09.17NATIONAL ALUMINIUM

COMPANY LIMITED

916 Jhingurda 22.09.17NATIONAL ALUMINIUM

COMPANY LIMITED

917 Jhingurda 22.09.17NATIONAL ALUMINIUM

COMPANY LIMITED

918 Jhingurda 22.09.17NATIONAL ALUMINIUM

COMPANY LIMITED

919 Jhingurda 22.09.17NATIONAL ALUMINIUM

COMPANY LIMITED

920 Jhingurda 22.09.17NATIONAL ALUMINIUM

COMPANY LIMITED

921 Jhingurda 22.09.17NATIONAL ALUMINIUM

COMPANY LIMITED

922 Jhingurda 22.09.17NATIONAL ALUMINIUM

COMPANY LIMITED

923 Jhingurda 22.09.17NATIONAL ALUMINIUM

COMPANY LIMITED

924 Jhingurda 22.09.17NATIONAL ALUMINIUM

COMPANY LIMITED

925 Jhingurda 22.09.17NATIONAL ALUMINIUM

COMPANY LIMITED

926 Jhingurda 22.09.17NATIONAL ALUMINIUM

COMPANY LIMITED

Page 33: Jhingurda- Status of loading of rakes a/c e-Auction ... · PDF file3 Jhingurda 27.02.13 NTPC LTD SIPAT Gatora Railway Station, Near Rewa, MP 04.04.13 11.04.13 loaded 4 Jhingurda 27.02.13

S.No. ProjectAuction

DateBidder Name

Destination/

Address

Allotment

Date

Loading

Date

Status of

Loading of

Rakes

Jhingurda- Status of loading of rakes a/c e-Auction (Auction-wise Seniority) as on 17.10.2017 (till midnight)

Jhingurda Project

927 Jhingurda 22.09.17 Vedanta Limited928 Jhingurda 22.09.17 Vedanta Limited929 Jhingurda 22.09.17 Vedanta Limited

930 Jhingurda 22.09.17 Vedanta Limited