jicable11, 19 - 23 june 2011 - versailles - france modern methods of installation and diagnostic...
TRANSCRIPT
Jicable’11, 19 - 23 June 2011 - Versailles - France
MODERN METHODS OF INSTALLATION AND DIAGNOSTIC TESTING
OF DISTRIBUTION POWER CABLES
Edward GULSKI, onsite.hv.solutions, Switzerland Frank DE VRIES, Alliander, The Netherlands
Piotr CICHECKI,, onsite.hv.solutions Benelux, The Netherlands Johan J. SMIT, TU Delft, The Netherlands
Jicable’11, 19 - 23 June 2011 - Versailles - France
CONTENT
• Introduction• Testing with DAC (OWTS)• Standards and knowledge rules for after installation tests• Standards and knowledge rules for diagnostic tests• Practical example• Conclusions• Future steps
Jicable’11, 19 - 23 June 2011 - Versailles - France
INTRODUCTION
• Biggest DSO in the Netherlands• Over 35000km MV cable circuits• MV levels: 6, 10, 20 and 50kV• 15 years experience in PD
measurements on MV cables• 3 teams specialists• Over the last 10 years more than
3500 cables have been diagnosed with DAC
Jicable’11, 19 - 23 June 2011 - Versailles - France
TEST PRINCIPLE OF DAC (OWTS)
L C cable
wifi
Computer
U & PD
Solid state switch
HV
Sou
rce
Jicable’11, 19 - 23 June 2011 - Versailles - France
PD MEASUREMENT WITH DAC (OWTS)
Testvoltage
PD activity
Jicable’11, 19 - 23 June 2011 - Versailles - France
IMPORTANT PARAMETERS• PD inception voltage (PDiV)• PD extinction voltage (PDeV)• PD level @ Uo• PD level vs Testvoltage• Phase resolve pattern• PD location
Jicable’11, 19 - 23 June 2011 - Versailles - France
Jicable’11, 19 - 23 June 2011 - Versailles - France
STANDARDS FOR AFTER INSTALLATION TESTSON NEW CABLES
• Based on NEN3620
– Voltage Withstand Test cablesheath
• 5kVDC-5 min
– Voltage Withstand Test main insulation
• 3xUo, 0,1Hz-15min or• 50 cycles 3xUo DAC
– PD measurements• 0,25-0,5-0,75.....2xUo
• Voltage withstand tests– Simple rule accepted / rejected– Destructive method– Not monitored
• PD measurements– Monitored test method– Gives information about abnormalities– Interpretation of results is complex
Alliander:All new cablecircuits are tested according NEN3620 also PD measurement are performed on new cable circuits that include joints
Jicable’11, 19 - 23 June 2011 - Versailles - France
PDiV < 1,7xUo
Rejected Accepted
PDiV > 1,7xUo
Decision process for PD testing with DACAfter laying testing of new Cable circuits: XLPE insulation
Jicable’11, 19 - 23 June 2011 - Versailles - France
PDiV < 1,2xUo
Rejected Accepted
1,2xUo < PDiV < 1,7xUo PDiV > 1,7xUo
PD intensity> 3 per cycle ?
no
yes
Decision process for PD testing with DACAfter laying testing of new Cable circuits: Cable joints
PD magnitude> 100pC ?
no
yesno
Repetition of test possible?
yes
Test repetition
Jicable’11, 19 - 23 June 2011 - Versailles - France
COMPANY STANDARDS FOR DIAGNOSTIC TESTSON AGED CABLES
• For XLPE cable circuits– Voltage Withstand Test on
cable sheath • 5kVDC-5 min
– PD measurements • up to 2xUo*
• For PILC circuits– PD measurements
• up to 2xUo*
– TanD measurements • up to 2xUo*
– Voltage withstand test• with DC 2xUo√2* 5
minutes, • VLF 2xUo* 5 minutes or• DAC 2xUo* 50 cycles
* Or lower testvoltage in case of safety aspects
Alliander:Only suspicious cablecircuits are diagnosed.
* Or lower testvoltage in case of safety aspects
Jicable’11, 19 - 23 June 2011 - Versailles - France
DEVELOPMENT OF KNOWLEDGE RULES FOR DIAGNOSTIC TESTS
Knowledge rules
-Statistics-Component investigations
-Determination-Statistic boundaries
-Physics of PD processes -Component properties (design and materials)-Operation parameters
-Escalation (destructive tests)-Fundamental tests-Behaviour of different PD types
Predict
Theoreticalinformation
Test
Laboratory tests
Evidence
Failure information
Detect
Measurementdata
Jicable’11, 19 - 23 June 2011 - Versailles - France
PRACTICAL EXAMPLE PD activity in a joint
Cable circuit in Alkmaar area: - 10kV PILC 3x95Cu and 3x150AL- 4 joints (different types of oil joints)
Interruption caused by external damage.After repairing the failure the cable sometimes broke down at 1,5Uo during the DC voltage test. Localisation of breakdown was difficult.
We applied PD measurement on the cable to detect the problem.
Joint 1: 260m
Joint 2: 310m
Joint 3: 650m
Joint 4: 700m
1100m
Jicable’11, 19 - 23 June 2011 - Versailles - France
PRACTICAL EXAMPLE Advise and taken action
Failure information
Measurementdata
Based on experiences joint 2 was replaced.However joint 1 had much higher max PD magnitude than joint 2 !!!
After replacing joint 2 no problems occurred in the circuit.
Joint 1 type A: 24000pC
Joint 2 type B: 6000pC
Jicable’11, 19 - 23 June 2011 - Versailles - France
CONCLUSIONS
• Combining PD measurements with withstand tests give much more information about the quality of the components
• After installation testing and diagnoses of new and old MV cable circuits by means of DAC gives reliable results
• Knowledge rules are developed for the determination of the condition of new and old cables and accessories
Jicable’11, 19 - 23 June 2011 - Versailles - France
FURTHER STEPS
• Pilot project in 2011: implementation of DAC diagnoses on old 50kV XLPE cable circuits– 25 measurements– Development of knowledge rules– Condition evaluation and proposal for the future
• Consider to implement DAC technology for after installation test procedure on 50kV cable circuits
Jicable’11, 19 - 23 June 2011 - Versailles - France
THANK YOU FOR YOUR ATTENTION
For more information: