jig jv managers workshop - jigonline.com · jig jv managers workshop teddington ... •c50...
TRANSCRIPT
JIG JV Managers Workshop
Teddington
September 26-27
2012
Joint Inspection Group Limited JIG JV Managers Workshop – Teddington 2012
Joint Inspection Group Limited JIG JV Managers Workshop – Teddington 2012
2
Energy Institute & JIG Projects
Martin Hunnybun
Technical Team Manager – Fuels & Fuel Handling
Energy Institute
Joint Inspection Group Limited JIG JV Managers Workshop – Teddington 2012
3
Energy Institute & JIG Projects
• Topics to review
Recap of the EI
Who is currently involved
Overview of publication inputs
Publications since 2010 (1542, 1582, 1570, 1598)
Current topics/issues
Summary
Joint Inspection Group Limited JIG JV Managers Workshop – Teddington 2012
4
Energy Institute & JIG Projects • ‘Learned society’ promoting sound
science since 1913
• Registered charity in the UK
• Not-for-profit organisation
• A series of technical committees
which generate cost-effective
technical knowledge
• A ‘consensus’ standards/good
practice developing organisation
• BSI Secretariat for test methods
• A technical research funding body
• A meeting place for technical
discussion between regulators
and operators - ‘honest broker’
• A professional membership
organisation – accredited in the
UK to award Chartered status
• A networking forum for branch
members (UK, Netherlands,
Houston, Hong Kong, Malaysia,
Nigeria)
• A home for c14,000 energy
professionals worldwide
• c50 employees focussed on
supporting the energy industry
Joint Inspection Group Limited JIG JV Managers Workshop – Teddington 2012
5
Energy Institute & JIG Projects
Aviation Committee - Rob Midgley (Shell Aviation)
Operations
John Rhode
(BP)
Sensors
M Campos
(TOTAL)
Hydrants
John Buxton
(Kuwait)
Equipment
Nic Mason
(Kuwait)
Filtration
Phil Rugen
(Shell)
• AirBP
• Air TOTAL
• Airlines 4 America
• Aviation Fuel Services GmbH
• Chevron
• ExxonMobil Aviation
• Int. Air Transport Association
• Joint Inspection Group
• Kuwait Aviation
• Phillips66
• Shell Aviation
• World Fuel Services
Joint Inspection Group Limited JIG JV Managers Workshop – Teddington 2012
6
Energy Institute & JIG Projects
• Formalising relationships –
EI Technical Liaison Partners
JIG, IATA, A4A
Joint Inspection Group Limited JIG JV Managers Workshop – Teddington 2012
7
Energy Institute & JIG Projects
• Overview of publication development inputs
EI 15xx New
Equipment
Standard or
Guidance 1st edition, 2012
Technical expertise of
specialists on EI Aviation
Committee (users,
operational & technical)
Technical expertise of
specialist drafting contractor
Technical expertise of
manufacturing specialists
Results from research
studies, possibly following
an incident/ new concepts
(may be funded by EI)
Industry stakeholder input
(operators, airlines,
suppliers, test houses,
regulators, airframe/engine
OEMs, consultants)
Industry association/
organisation input (JIG,
IATA, A4A, CRC, SAE,
ASTM etc)
International Consensus
Energy Institute Credibility
and Reputation
Joint Inspection Group Limited JIG JV Managers Workshop – Teddington 2012
8
Energy Institute & JIG Projects
• Greater international visibility
References in ICAO Manual
– 13 existing EI publications
– 2 in preparation
Renewed focus on maintenance of publications
Timely delivery of new titles – EI/JIG 1530 upstream
fuel quality, EI 1560 hydrant operation
Joint Inspection Group Limited JIG JV Managers Workshop – Teddington 2012
9
Energy Institute & JIG Projects
• Key publications since 2010
EI 1582 – standardization of similarity sheets for FWS
EI 1542 – colour-coding equipment
EI 1570
EI 1598
2 research reports
into-plane electronic
sensors for dirt/water
detection
Joint Inspection Group Limited JIG JV Managers Workshop – Teddington 2012
10
Energy Institute & JIG Projects
• EI 1542 – standard for
colour-coding of equipment
New grades - Aviation gasoline
UL 87 - Yellow
UL 91 - Orange
100VLL - Blue
Joint Inspection Group Limited JIG JV Managers Workshop – Teddington 2012
11
Energy Institute & JIG Projects
• EI work on electronic sensors – for cleanliness
monitoring during aircraft fuelling
The issue? - Filter monitors not fail-safe, advances in
technology, benefits of additional safeguard,
continuous monitoring
• EI initiatives:
EI 1598 Considerations for sensors 1st ed, 2007
EI 1598 2nd ed, 2012 – with laboratory testing protocols
EI 1570 Handbook to sensors, August 2012
Joint Inspection Group Limited JIG JV Managers Workshop – Teddington 2012
12
Energy Institute & JIG Projects
• EI work on electronic sensors – EI 1598 System Test
- Self-checking
- Fault diagnosis
Electrical Installation
- Area classification
- Power supply
- Consumption
Mechanical Installation
- For sampling
- Spacing
- Easy maintenance
- Fuel contact
Design Requirements
(every sensor)
- Materials of construction
- Operating temp. range
- Flow rate (up to 4500 lpm) & impact of
reverse flow
- Pressure
- Lubrication, integrity, vibration, self-
cleaning, sampling
Minimum Performance
Requirements
(every sensor)
- Evidence of detection capability
- Detection cross-over between dirt
and water
- Influence of flow rate
- Ability to detect ≥ 15 ppmv free
water
- Ability to detect ≥ 0,15 mg/l dirt
- Response time to output signal
- Recovery time
Standardised Laboratory Testing
Protocols
(First Article Testing)
- Annex A: Performance verification
using test dust and free water
- Annex B: Pressure testing
- Annex C: Material compatibility
testing
Standard Reporting
- Standard Report for performance
verification results
- Recommendations for ‘continuous’
data charts
Calibration
- Procedures
- Frequency
Drawings, Certificates, Operating Manual
- General drawing, parts list
- Installation/commissioning procedures
- Maintenance procedures
- Certifications
- Operating manual
EI 1598
2nd edition
Joint Inspection Group Limited JIG JV Managers Workshop – Teddington 2012
13
Energy Institute & JIG Projects
Joint Inspection Group Limited JIG JV Managers Workshop – Teddington 2012
14
Energy Institute & JIG Projects
• 1570 Handbook on sensors
Introduction of technologies
Explaining how 1598 should
be used by those considering
sensor implementation
Clarity of terminology
Managing expectations of
industry
Joint Inspection Group Limited JIG JV Managers Workshop – Teddington 2012
15
Energy Institute & JIG Projects
• 1570 Handbook on sensors
“All of the technologies considered
are able to show a response/change
to the contamination levels included
in Annex A of EI 1598 2nd edition.
However, relating such
responses/changes to absolute
values for the contaminants,
robustly/reliably over time for every
application, is virtually impossible”
Joint Inspection Group Limited JIG JV Managers Workshop – Teddington 2012
16
Energy Institute & JIG Projects
• Current projects/topics - sensors
A process is now in place for companies
wishing to evaluate sensors (EI 1598)
A4A/EI/IATA/JIG workshop with airlines, 17 May,
endorsed alternative approach - use of a simple
‘water probe’ in vehicle pipework (upstream
of filter) to detect bulk water contamination
EI funding testing of a selection of probes to
establish whether they are robust, suitable for
turbulent systems and do not give false alarms
Joint Inspection Group Limited JIG JV Managers Workshop – Teddington 2012
17
Energy Institute & JIG Projects
• Current projects - Meter proving
HM20 Proving of aviation fuelling positive
displacement meters, 2nd edition. Due 4Q 2012.
- New section on electronic meter heads which
includes a process for auto-calibrate functionality
- Introduces a simplified low flow overwing meter
process/methodology for meter calibration.
- Include ideal meter calibration equipment layout
i.e. location and type of valves, temperature
probes and pressure gauges, etc
Joint Inspection Group Limited JIG JV Managers Workshop – Teddington 2012
18
Energy Institute & JIG Projects
• EI 1597 – Prevention of missfuelling
Second edition in prep to include new grades of
Avgas
Documentation for fuel + FSII – confirm with pilot
whether FSII is needed
Input from AirBP human factors study
Further input from JIG Operations Committee, 4Q
2012
Publication of EI 1597 2nd edition expected 1Q 2013
Joint Inspection Group Limited JIG JV Managers Workshop – Teddington 2012
19
Energy Institute & JIG Projects
• EI 1540 Design and construction of aviation
fuelling facilities
Fifth edition in preparation
Update based on evolving
industry experience
– contributions welcome
Publication delayed due to
preparation of other titles,
likely by mid-year 2013
Joint Inspection Group Limited JIG JV Managers Workshop – Teddington 2012
20
Energy Institute & JIG Projects
• EI/JIG 1530 1st ed (in preparation)
Quality assurance requirements for the manufacture,
storage and distribution of aviation fuel to airports
It incorporates JIG 3 Issue 11, so EI/JIG 1530 1st
edition will effectively be JIG 3 Issue 12 (TBC)
Emphasis is on issues upstream of airports that
could impact product quality (primarily jet fuel)
The publication includes mandatory language to
facilitate (self-)compliance assessment
Joint Inspection Group Limited JIG JV Managers Workshop – Teddington 2012
21
Energy Institute & JIG Projects
Refining Distribution Airport Supply
EI/JIG 1530 (due 1Q 2013)
JIG 2 JIG 1
EI 1540
A4A 103
Certification
API 1543 API 1595
Joint Inspection Group Limited JIG JV Managers Workshop – Teddington 2012
22
Energy Institute & JIG Projects
• EI/JIG 1530 content
Quality assurance and traceability
Management of Change
Sampling and product testing
Refining – feedstocks, monitoring processes, additives,
laboratories. Synthetic jet.
Receipt, batching, certification and release
Storage – at refineries, terminals, floating. Design requirements
and procedures
Transportation – Marine, inland waterways, pipelines, road, rail,
drums, IBCs, ISO tank containers
Joint Inspection Group Limited JIG JV Managers Workshop – Teddington 2012
23
Energy Institute & JIG Projects
• EI/JIG 1530
First full draft issued for EI/JIG review
Industry consultation draft to be issued mid-October,
for review until 3 Dec 2012. Publication 1Q 2013
Please provide technical feedback during 4Q 2012
Think about how requirements may impact the
supply chains into your location
Help raise awareness of requirements throughout
supply chains
JIG to decide future of JIG 3
Joint Inspection Group Limited JIG JV Managers Workshop – Teddington 2012
24
Energy Institute & JIG Projects
• Current EI research topics
Conductivity requirements for jet fuel – likely to be
issued 4Q 2012
Ageing infrastructure assessment
Joint Industry Project – Gaining OEM approvals for
100 mg/kg FAME in jet fuel. US military to the
rescue?
Joint Inspection Group Limited JIG JV Managers Workshop – Teddington 2012
25
Energy Institute & JIG Projects
• EI website
Joint Inspection Group Limited JIG JV Managers Workshop – Teddington 2012
26
Energy Institute & JIG Projects
Joint Inspection Group Limited JIG JV Managers Workshop – Teddington 2012
27
Energy Institute & JIG Projects
• Summary
New Technical Partners and Technical Liaison
Partners established – more welcome
First joint EI/JIG title being drafted for 1Q2013 issue
Much work completed on sensors – read the 1570
handbook – future with bulk water detection probes
EI AvCom currently working on 11 publications + 2
research reports
Draft versions of all publications available for review.
Your input is invaluable
Joint Inspection Group Limited JIG JV Managers Workshop – Teddington 2012
28
Energy Institute & JIG Projects
Any questions?