JIGAWA STATE GOVERNMENT DUE PROCESS AND PROJECT MONITORING BUREAU OFFICE OF THE EXECUTIVE GOVERNOR END OF YEAR PROJECTS REPORT JANUARY TO DECEMBER, 2017 WEB: WWW.JIGAWADUEPROCESS.COM EMAIL: [email protected]

Upload: others

Post on 07-Feb-2020

12 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

JIGAWA STATE GOVERNMENT

DUE PROCESS AND PROJECT MONITORING BUREAU

OFFICE OF THE EXECUTIVE GOVERNOR

END OF YEAR PROJECTS REPORT

JANUARY TO DECEMBER, 2017

WEB: WWW.JIGAWADUEPROCESS.COM

EMAIL: [email protected]

Page 2: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

CONTENTS SECTION (A) - EXECUTIVE SUMMARY

SECTION (B) - CHARTS

SECTION (C) - PRE-CONTRACTS EVALUATIONS JANUARY TO DECEMBER, 2017

SECTION (D) - CONTRACTS AWARDED JANUARY TO DECEMBER, 2017

SECTION (E) - COMPLETED PROJECTS

SECTION (F) - ON-GOING PROJECTS

- MINISTRY OF HEALTH - MINISTRY OF WATER RESOURCES - MINISTRY OF WORKS AND TRANSPORT - MINISTRY OF EDUCATION, SCIENCE & TECHNOLOGY - GOVERNMENT HOUSE - MINISTRY OF LAND AND HOUSING - MINISTRY OF COMMERCE - DIRECTORATE OF EONOMIC EMPOWEERMENT - DUTSE CAPITAL DEVELOPMENT AUTHORITY - CABINET OFFICE - MINISTRY OF INFORMATION - MINISTRY OF AGRICULTURE - MINISTRY OF WOMEN AFFAIRS - OFFICE OF THE HEAD OF SERVICE - SUBEB - MINISTRY OF JUSTICE - MINISTRY OF FINANCE AND ECONOMIC PLANNING - JIGAWA STATE COLLEGE OF ISLAMIC & LEGAL STUDIES, RINGIM - BINYAMINU USMAN POLYTECHNIC, HADEJIA - MINISTRY OF ENVIRONMENT - JIGAWA STATE COLLEGE OF EDUCATIO, GUMEL - JIGAWA STATE INFORMATICS INSTITUTE, KAZAURE

Page 3: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

JIGAWA STATE GOVERNMENT

DUE PROCESS & PROJECTS MONITORING BUREAU END OF YEAR REPORT JANUARY-DECEMBER, 2017

1.00 EXECUTIVE SUMMARY. In a presentation made by His Excellency, Muhammad Badaru Abubakar, MON, mni, the Executive Governor of Jigawa State, during the Year 2018 Appropriation Bill submission to the Jigawa State House of Assembly, dated 28th November,2017, He described the budget performance of 80% as satisfactory by any standard especially when compared against overall expenditure performance of 61% during the same period last year. He further explained ‘The sum of N129.87 billion was originally appropriated for 2017 Fiscal Year which was followed-up with Supplementary Appropriation of N12.1 billion. The latter was in respect of receipt of N7.1 billion from the Paris Club Refunds and the drawdown of N5.0 billion Commercial Agriculture Credit Facility approved by the House. While performance varied amongst the various revenue components, taking into account actual revenue receipt at the end of November, it was projected that the total revenue during the entire year would be almost N113.8 billion which is about 88% of the total income under the 2017 Appropriation. Even though this is slightly below the approved estimate, considering the prevailing circumstances, this is not bad a performance at all’. The Due Process and Projects Monitoring Bureau as the organ responsible for monitoring the implementation of capital projects and publication the details of major contracts, hereby present the end of year 2017 report. The report consists of four sections, which include Pre-contract Evaluations, Contracts Awarded, Completed and On-going Projects within the period under review.

Page 4: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

2.00 PRE-CONTRACT EVALUATIONS During the period under review projects worth N23,706,083,831.07 only were submitted for vetting out of which the Bureau recommended N22,765,022,041.84 only for execution, thereby saving N941,061,789.22 only (0.039%) in favor of the government which is slightly lower than the previous year. 3.00 CONTRACTS AWARDED The sum of N67.48 billion was budgeted for capital expenditure, for both on-going projects and new ones, representing 51.96% of the total budget this year. Projects worth N11,346,722,830.30 representing 16.81% of total capital budget provision were awarded in the year 2017 which is less than the previous year 2016 by about N15.00 billion. This is due to the economic realities prevailing during the year and efforts being made to reduce the quantum of outstanding liabilities inherited. In line with best practice, at least 80% of the total contracts awarded should be by Open Competitive Process; however only 272No contracts worth N7,639,293,815.64 only, representing 67.33% of the total, were awarded by this process. While those awarded by Selective and Nominative tender process record 0.83% and 31.84% respectively. This performance is comparable with that obtained in the previous year and need to be enhanced in the successive years ahead. Furthermore, the percentage of the indigenous contractors that secure contracts in the state exceed 50%, which translate in not less than 50% of the total value of contracts awarded within this reporting period, thereby enhancing socio economic activities in the state. This was due to the fact that not much mega projects were awarded to allow for those on-going to be completed and paid for accordingly. 4.00 POST CONTRACT EVALUATION Projects with contract value of N115.014 billion have been reported under this section. Most of the projects, at various stages of completion, were carried forward from the previous years as ongoing and yet to be completed due to funding problems. Currently some of the projects, being reported upon (29.7%) have reached completion stage, others ongoing (69.3%) and the balance (1.0%), stagnant.

Page 5: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

5.00 COMPLETED PROJECTS This section contains details of completed projects worth N34,193,891,012.40 only (29.7%) out of the N115.014 billion contracts been reported .It is on record that the country has experienced recession at a particular period within the year, as such funding was a problem to allow for completion of major capital projects nationwide. However, with the exit from the recession period it is hoped that there will be a lot of improvement on performance in the successive years to come. 6.00 ON-GOING PROJECTS The value of on-going projects, including stalled, being reported under this section, amounts to N80,820,679,677.34 only (70.3%) of the total contracts under consideration. The present administration is trying its very best to effect payment on all contracts awarded from 2016 to date and claims from contractors were paid within thirty working days of presentation at the finance Ministry. However, as the state exit from recession, the performance on the on-going projects will improve and better result will be recorded. 7.00 OBSERVATIONS Despite the fact that the country is now out of recession and there is some enhancement from the federation in terms of bail-out, the implementation of new capital projects has slightly drop due to payment of inherited liabilities and capital commitment from the previous administration. Total value of contracts awarded in 2016 was N26.65 billion which represent 37.37% of approved capital budget, while in 2017 it stands at N11.34 billion which represent 16.81% of 2017 approved capital budget respectively. In spite of the level of transparency in the award of contracts which stand at 67.30%, by open competitive process, compared with other methods approved by law, i.e. selective (0.86%) and nominative (31.84%) respectively, it is still below the best practice threshold of 80%. The present administration is always prompt in payments of contracts currently awarded, thereby attracting more patronage from investors/ registered companies into the state. The law provision, which requires that all contracts, the value of which is above N100.00 million, a performance bank guarantee must be presented, is yet to take effect despite several reminders forwarded by the Bureau to government.

Page 6: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

The use of Standard Bidding Document (SBD) by agencies during tender process is also yet to be complied with in full, despite extensive training and revision of the existing document conducted by Partnership to Engage, Reform and Learn (PERL)-Accountable, Responsive and Capable Government (ARC), and emphasis made by the Bureau to achieve compliance with best practices as provided by law. 8.00 CONCLUSION/ RECOMMENDATION In conclusion, we congratulate the current administration in the way it is managing the meager resources of the state and spreading developmental projects across all constituencies in the state and making frantic effort to complete all on-going projects and settle outstanding liabilities inherited, as promised. Finally, the following recommendations were proffered to improve performance and decision making; • Government is advised to make its debt profile public, as per provisions of Fiscal Responsibility Law, so that efforts being made to off-set it could be appreciated by all, despite economic realities. • All efforts should be made to ensure that projects whose value exceed N100 million were awarded by Open Competitive process unless where necessary to observe otherwise, to improve the level of open competitive tendering process above 80% as per best practice. • Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less than 10% the valued of contract awarded , in excess of N100 million, as per provision made in the State Procurement Guidelines. This will enhance performance of on-going projects and ensure that they are completed within the stipulated time agreed.

Page 7: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

• Government need to approve the submitted Standard Bidding Documents (SBD), presented by the Bureau, to ensure full compliance by all MDAs, as per best practice. • Government should direct all MDAs to proffer more ways to improve the state revenue base with a view to, at least, upset the recurrent expenditure requirement, accordingly. • Details of payments and releases on capital projects to MDAs and contractors need to be copied to the Bureau to improve its information base by the treasury department. The ministry of finance is called upon to ensure the completion and implementation of capital projects data base initiated by SPARC. ………………………………….. ……………………..... ALH. IBRAHIM BABA CHAICHAI ADO HUSSAINI MON SPECIAL ADVISER DIRECTOR GENERAL.

Page 8: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

SECTION ( B )

CHARTS

JANUARY TO DECEMBER, 2017

Page 9: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

PROJECTS BEING EXECUTED BY MINISTRIES/AGENCIESJANUARY-DECEMBER, 2017

ENVIRONMENT LAND & HOUSING Min. of Justic

GOVT. HOUSE FINANCE HEAD OF SERVICE

WOMEN AFFAIRS CABINET OFFICE COMMERCE

ECONOMIC EMPOWERMENT

Page 10: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

66,252,432,482.20

2,909,305,115.67

25,205,628,414.45

9,539,815,204.72

5,013,314,824.22

744,887,264.60 1,209,381,562.23

WORKS &TRANSPORT

WATERRESOURCES

DCDA EDUCATION HEALTH AGRICULTURE INFORMATION

PROJECTS BEING EXECUTED BY MINISTRIES/AGENCIESJANUARY-DECEMBER, 2017

WORKS & TRANSPORT WATER RESOURCES DCDA

EDUCATION HEALTH AGRICULTURE

INFORMATION

Page 11: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

108,822,854.32

14,754,828.72

229,843,611.50

20,467,308.07

49,793,055.32

PROJECTS BEING EXECUTED BY MINISTRIES/AGENCIESJANUARY-DECEMBER, 2017

JSCI &LS Ringim SUBEB BU Poly Hadejia JSCOE Gumel INFORMATIC Kazaure

Page 12: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

34,193,891,012.40 , 30%

80,820,679,677.34 , 70%

ANALYSIS OF PROJECTS PERFORMANCE JANUARY-DECEMBER, 2017

Completed On-going

Page 13: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

SECTION ( C )

PRE-CONTRACT EVALUATION

JANUARY TO DECEMBER, 2017

Page 14: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

Pre-contract Evaluation

S/N PROJECT IN PROCESS QUOTED SUM DPPM RECOMMENDED SAVING/ REMARKS

(N) COST (N) INCREASE

MINISTRY OF HEALTH

1 Proposed construction of (30NO.) Proto ty pe basic health Clinic (BHC) across the state 1,005,380,280.30 957,087,195.30 48,293,085.00 Min of Health

2

Renew al of Contract on Cleaning serv ices at Rasheed Shekoni Special ist Hospital Dutse by MESSRS: Al-

hussad Tow n cean. 14,758,250.00 14,758,250.00 - Min of Health

3 Proposed supply of funiture to school of nursing Hadejia. 51,581,193.00 47,076,618.00 4,504,575.00 Min of Health

4

Renew al of contract on landscaping and garden maintenance at college of nursing and midw ifery Birnin kudu by

MESSRS: Dan Asabe Muhammad General v entures 7,308,000.00 7,308,000.00 - Min of Health

5

Proposed Supply of Office Equipment, Furnitures, Electronics, Accessories and consumables for sav e one Million

liv es. 10,434,037.50 8,608,110.00 1,825,927.50 Min of Health

6 General Renov ation /Improv ement and Water scheme at K/Hausa General Hospital (Variation /Fluctuation) 35,745,150.74 15,230,189.96 20,514,960.78 Min of Health

7 General Renov ation /Improv ement and Water scheme at Jahun General Hospital (Variation /Fluctuation) 15,130,922.71 13,278,686.28 1,852,236.43 Min of Health

8

Proposed 200 Metres Ex tension of cov ered Walkw ay to Link the new ly Constructed Structure at K/Hausa

General Hospital. 12,039,149.85 11,843,451.34 195,698.51 Min of Health

9

Proposed Supply of (3NO.) Vehicle,(100,000 Piecies) oflong lasting insectcide nets and (104,200) units of HIV test

kits. 102,390,000.00 99,335,250.00 3,054,750.00 Min of Health

10 General Renov ation /Improv ement of Fagam P.H.C. (Variation /Fluctuation) 6,918,733.71 6,548,882.59 369,851.12 Min of Health

11 General Renov ation /Improv ement of Taura P.H.C. (Variation /Fluctuation) 9,512,717.24 8,470,328.99 1,042,388.25 Min of Health

12 Renew al of Insurance cov er in respect of Jigaw a Medicare supply company (JIMSO) 926,317.12 926,317.12 - Min of Health

13 Proposed Dev elopment of Specialist Hospital at Hadejia 1,655,396,503.11 1,634,964,995.94 20,431,507.17 Min of Health

14 Renew al of contractfor Fire and Motor Vehicle Insurance cov er at Rasheed Shekoni Specialist Hospital Dutse 4,992,806.64 4,992,806.64 - Min of Health

15 Proposed general renov ation and maintenance w ork at College of Nursing and Midw ifery Birnin kudu 18,505,231.21 13,893,815.76 4,611,415.45 Min of Health

16 Proposed general renov ation at Primary Health Clinic Malam madori 52,515,467.88 48,915,797.04 3,599,670.84 Min of Health

17 Proposed general renov ation (Phase II) at Babura General Hospital. 53,397,544.22 46,967,714.72 6,429,829.50 Min of Health

18 Proposed construction of School of Midw ifery Babura 703,072,290.00 637,381,861.30 65,690,428.70 Min of Health

19 Proposed supply and installation of Solar pow ered lighting sy stem at Babura General Hospital. 24,524,784.38 20,984,971.88 3,539,812.50 Min of Health

20 Proposed supply and installation of Solar pow ered lighting sy stem at Gumel General Hospital. 35,067,178.12 30,263,168.13 4,804,009.99 Min of Health

21 Proposed construction of 30NO. Hand Pumps at 30NO. Basic Health Clinics in the State.(each) 881,995.86 800,887.50 81,108.36 Min of Health

22 Proposed renov ation/improv ement of Jigaw ar Dan Ali PHC Babura Local Gov t area. 4,570,981.99 4,563,864.59 7,117.40 Min of Health

23 Proposed renov ation/improv ement of Hadejia General Hospital. 106,068,079.17 101,725,900.85 4,342,178.32 Min of Health

24 Proposed upgrading of Gw aram Cottage to full pledged General Hospital. 99,258,576.78 100,842,569.19 (1,583,992.41) Min of Health

25

Supply and installation of 20KVA and 15KVA perking sound proof Generator (UK assembled) at Babura general

Hospital, Taura and Fagam PHCs. 9,397,500.00 8,947,500.00 450,000.00 Min of Health

26 Proposed supply of (1NO.) v ehicle 16,625,000.00 16,562,500.00 62,500.00 Min of Health

27 Proposed renov ation/improv ement of Fagam basic Health Clinic (additional w orks) 3,086,721.00 2,102,757.00 983,964.00 Min of Health

BAL. C/F 4,059,485,412.53 3,864,382,390.12 195,103,022.41

Page 15: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N PROJECT IN PROCESS QUOTED SUM DPPM RECOMMENDED SAVING/ REMARKS

(N) COST (N) INCREASE

BAL. B/F 4,059,485,412.53 3,864,382,390.12 195,103,022.41

28

Proposed procurement of airseparation (Ox y gen) Plant and Endoscopy Machine at Rasheed shekoni specialist

Hospital Dutse. 102,472,900.00 102,472,900.00 - Min of Health

29 Proposed supply and installation of Solar Pow ered Lighting sy stems in Dutse General Hospital. 32,435,221.87 27,835,303.13 4,599,918.74 Min of Health

30 Proposed supply and installation of Equipments to the new ly constructed 30NO. Basic Health Clinic across the State 109,776,420.00 109,776,420.00 - Min of Health

31 Proposed Renov ./Improv ement of Old ICT and Block ( D & E) male hostel at College of Health tech. Jahun 36,920,942.97 30,531,938.16 6,389,004.81 Min of Health

32 Proposed completion of new school of Nursing Hadejia 57,895,998.54 58,681,266.23 (785,267.69) Min of Health

33 Proposed ex tension of ex isting Wall fence height at Ringim General Hospital 7,844,520.38 7,599,406.45 245,113.93 Min of Health

34 Procurement of dialog ev o dialy sis Machine to Rasheed shekoni specialist hospital, Dutse 8,350,000.00 8,350,000.00 - Min of Health

35 Proposed renov ation of Gw iw a Primary Health Care (PHC) 10,819,583.50 9,878,404.40 941,179.10 Min of Health

36

Proposed procurement of 1NO.Hy undai creta ev alution Jeep (2016 model) to Rasheed shekoni specialist Hospital

Dutse 16,975,500.00 13,118,437.50 3,857,062.50 Min of Health

37 Proposed installation of (24NO.)new climeceiling fans in 40 bed w ard at Ringim General Hospital 745,700.00 687,400.00 58,300.00 Min of Health

38 Proposed renov ation/Improv ement of Dutse General Hospital 65,144,641.88 65,775,118.09 (630,476.21) Min of Health

39 Proposed Renov ation of Gujungu Primary Health Care 34,201,481.24 35,518,580.71 (1,317,099.47) Min of Health

40 Proposed Renov ationof Basirka Primary Health Care 17,132,437.01 14,766,348.45 2,366,088.56 Min of Health

41 Proposed Renov ation of Kany a Babba Primary Health Care 30,056,408.67 27,609,456.17 2,446,952.50 Min of Health

42 Proposed Renov ation of Roni Primary Health Care 26,282,890.99 26,766,366.64 (483,475.65) Min of Health

43 Proposed Renov ation of Kaugama Primary Health Care 30,636,788.92 35,574,703.10 (4,937,914.18) Min of Health

44 Proposed upgrading of Bulangu cottage to General Hospital 73,211,326.12 81,978,904.89 (8,767,578.77) Min of Health

45 Proposed upgrading of Kazaure Psy chiatric Hospital 48,603,680.99 48,714,143.91 (110,462.92) Min of Health

46

Contract for the Prov ision of cleaning serv ices at new ly constructed blocks (A&E, GOPD, male and female

amenity w ards) at Rasheed shekoni specialist hospital, Dutse. 5,760,000.00 4,800,000.00 960,000.00 Min of Health

47 Proposed construction of new General hospitals (3No.) at Buji, Garki and Guri Local Gov t head quarters (each) 461,330,785.51 469,714,568.51 (8,383,783.00) Min of Health

48 Proposed Supply of (36,571NO) long lasting insecticide treated nets for sav ing one million liv es project 31,999,625.00 31,999,625.00 - Min of Health

49 Proposed constr of w all fence at Kazaure Specialist Hospital 82,779,004.67 57,329,839.45 25,449,165.22 Min of Health

50 Supply of Equipment to Babura General Hospital 96,611,034.00 99,533,555.00 (2,922,521.00) Min of Health

MINISTRY OF WATER RESOURCES -

51

Proposed purchaseand installation of 11KW (15HP) v ertical booster at Takur site, Model Dan masara and Burtilan

w ater supply schemes Dutse 9,504,000.00 7,120,000.00 2,384,000.00 Min of Water

BAL. C/F 5,456,976,304.79 5,240,515,075.91 216,461,228.88

Page 16: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N PROJECT IN PROCESS QUOTED SUM DPPM RECOMMENDED SAVING/ REMARKS

(N) COST (N) INCREASE

BAL. B/F 5,456,976,304.79 5,240,515,075.91 216,461,228.88

52 Proposed rehabilitation of Takatsaba, Sabon gari "Ya "y a, Dogon marke, Tagw ay en fage w ater supply scemes 2,351,213.00 2,001,037.00 350,176.00 Stow a

53 Improv ement of Ringim w ater supply scemes (Additional w ork) 2,495,000.00 2,635,000.00 (140,000.00) Water Board

54 Proposed fencing of conv erted w ater supply sceme to solar at Ringim zone 1,411,852.00 1,279,625.00 132,227.00 Water Board

55 Proposed rehabilitation of 4NO. Water supply scemes (Kudai, Andaza, Makaddari and Abay a)

1,224,040.63 998,050.00

225,990.63 Stow a

56 Additional Work Improv ement of Ringim Water Supply Schemes 3,189,375.00 3,189,375.00 - Min of Water

57

Proposed conv ersasion of Motorised w ater pumps Stations (15NO.) to Solar Pow ered Sy stem w ith Hy brid

Inv erter Across the State

79,276,640.63 79,883,015.63

(606,375.00) Min of Water

58 Rehabilitation of Danladin Gumel, 'Yar gaba and Gamay in Water supply Schemes 3,198,300.00 2,850,750.00 347,550.00 Stow a

59 Improv ement of Babura Water Supply Schemes (Additional w ork) 56,186,968.79 56,563,431.19 (376,462.40) Min of Water

60 Request for Change of Contractor for the Construction of 7NO. Hand Pumps in Maigatari (Constituency Project) - Ruw asa

61 Improv ement of Gumel Tow n Water Supply Schemes (Variation /Fluctuation) 34,546,175.00 33,651,870.00 894,305.00 Min of Water

62 ProposedConstruction of Water Collection Point 1,346,817.00 1,312,811.54 34,005.46 Ruw asa

63 Improv ement of Ringim Water Supply Schemes (Phase II additional w ork) 37,278,239.91 52,090,958.59 (14,812,718.68) Min of Water

64

Request for the Conv ersion of Motorised Pumps Stations to Solar Pow ered Sy stem w ith Hy brid Inv erter Across

the State 76,305,954.75 65,622,247.03 10,683,707.72 Min of Water

65

Repairs of 650KVA Perkins Generator at Jekarde Water Works, Kazaure Zone, Improv ement of Kazaure Tow n

Water Supply 1,464,257.81 1,845,998.44 (381,740.63) Min of Water

66 Proposed Construction of w ater Pipeline from Cottage Hospital to Gw aram Sabuw a Tow n B/kudu Zone 41,596,222.50 37,456,335.00 4,139,887.50 Min of Water

67 Proposed Improv ement Works at Taura w ater Pump Stations 4,257,855.00 4,131,067.50 126,787.50 Min of Water

68 Request for the Change of Groundfos Submersible Pump to CRI Pump at Gumel Water Improv ement Project - Min of Water

69

Proposed Replacement of Submersible Pumps and Upgrading of Water schemes to Solar at Gagaraw a Tow n,

Gumel Zone 6,638,520.00 8,713,057.50 (2,074,537.50) Min of Water

70 Rehabilitation of Kany a Babba Water Supply Schemes, Babura zone 13,093,364.00 11,221,603.14 1,871,760.86 Stow a

71 Rehabilitation of Kudai and Albasu Water Supply Schemes, Dutse zone 2,138,587.50 1,933,837.00 204,750.50 Stow a

72 Conv ersion of Motorised to Solar Pow ered Water supply Scheme at Garki main Pump station 34,770,645.00 34,070,557.50 700,087.50 Water Board

73 Upgrading of small Tow n Water supply Scheme at Birnin kudu, Dutse, Ringimand Gumel zones. 96,305,581.10 89,434,800.00 6,870,781.10 Stow a

74 Proposed repair of 3NO. Vehicles 2,640,000.00 2,640,000.00 - Min of Water

75 Procurement of M & E equipment for bore holes sample analy sis 2,550,000.00 2,550,000.00 - Min of Water

BAL. C/F 5,961,241,914.41 5,736,590,502.97 224,651,411.44

Page 17: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N PROJECT IN PROCESS QUOTED SUM DPPM RECOMMENDED SAVING/ REMARKS

(N) COST (N) INCREASE

BAL. B/F 5,961,241,914.41 5,736,590,502.97 224,651,411.44

76

Proposed community mobilization, sensitization and establishment of Water consumers(WCA'S) in 132NO.

Communities across the State 6,034,000.00 4,970,000.00 1,064,000.00 Stow a

77 Proposed procurement of I.T. Office equipment 1,699,500.00 1,429,500.00 270,000.00 Min of Water

78

Proposed construction of completes Solar pow ered Watersupply scheme at 'Yan maulu Tow n in Babura Local

Gov t and conv ersion of Daba Tow n Watersupply Scheme in Kazaure Local Gov t. 14,149,931.25 14,255,587.50 (105,656.25) Stow a

79 Proposed procurement and replacement of Pumps at Malam madori Tow n Pump station 2,431,800.00 2,431,800.00 - Water Board

80 Improv ement of Hadejia Tow m Water supply Scheme 218,627,832.62 210,741,680.44 7,886,152.18 Water Board

81 Proposed conv ersion of Solar Water supply scheme in Sara Tow n Gw aram Local Gov t. 21,183,750.00 18,506,250.00 2,677,500.00 Stow a

82 Improv ement of Kiy aw a Tow n Water supply Scheme 37,608,346.59 38,571,055.11 (962,708.52) Water Board

83 Supply of Pumps and gen set at Roni Tow n Water supply scheme 7,537,687.50 7,378,750.00 158,937.50 Water Board

84 Improv ement of Taura Tow n Water supply Scheme 53,713,227.80 51,176,269.46 2,536,958.34 Water Board

85 Proposed rehabilitation of 11NO. Small Tow n Water supply across the State. 8,601,218.16 7,822,607.70 778,610.46 Stow a

86 Improv ement of Jahun Tow n Water supply Scheme 20,510,634.38 19,822,950.00 687,684.38 Water Board

87 Proposed rehabilitation of some ex isting Water supply scheme across the State. 12,797,268.75 13,626,955.13 (829,686.38) Stow a

88 Proposed Constr. of Hand pump Borehole and VIP Latrine 2,394,940.18 2,618,611.84 (223,671.66) RUWASA

89

Proposed Rehab of 17no. Hand pumps and Conv ersion of 2no. Open w ells to Handpumps at Jigaw a w ard,

Babura LGA.

1,320,410.00 1,121,851.50

198,558.50 RUWASA

90 Improv ement of Babura w ater Supply schemes (Rev ised Additional Work PHASEII) 83,058,120.81 78,358,920.45 4,699,200.36 Water Board

91 Proposed additional w ork for the improv ement of Gumel tow n w ater supply project (rev ised phaseII) 62,939,996.83 62,284,251.88 655,744.95 Water Board

92 Procurement of w ater pumps, starters at Dutse, Hadejia andKazaure zone 6,494,250.00 5,607,000.00 887,250.00 Water Board

93 Improv ement of Ringim w ater Supply schemes (PHASEII) 77,971,175.06 75,569,748.42 2,401,426.64 Min of Water

94

Prov ision of Solar Water supply scheme at proposed multi-purpose plastic w aste recy cling machine site

Danmasara, Dutse 8,810,711.44 8,078,141.53 732,569.91 Water Board

95

Proposed estimate for community mobilization, sensitization and establishment of Water consumers in 55NO.

Communities across the State 2,406,750.00 2,252,250.00 154,500.00 Stow a

96 Proposed procurement of (2NO.) 60KVA perkins Generators set 7,500,000.00 9,712,500.00 (2,212,500.00) Water Board

97 Proposed conv ersion of Zobiy a motorised Watersupply scheme to solar in Dutse local Gov t Area. 6,021,751.00 6,021,751.00 - Stow a

98 Rehabilitation of Garado and nine others Water supply scheme 6,752,600.00 5,540,850.00 1,211,750.00 Stow a

99 Proposed procurement and installation of 500KVA Transformer at Jekarade Water w orks Kazaure 5,705,000.00 5,391,400.00 313,600.00 Water Board

100 Proposed upgrading and conv ersion of Solar pow ered w ater supply schemes across the state (rev ised scope) 93,848,844.52 90,265,107.03 3,583,737.49 Stow a

BAL. C/F 6,731,361,661.30 6,480,146,291.96 251,215,369.34

Page 18: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N PROJECT IN PROCESS QUOTED SUM DPPM RECOMMENDED SAVING/ REMARKS

(N) COST (N) INCREASE

BAL. B/F 6,731,361,661.30 6,480,146,291.96 251,215,369.34

100 Proposed procurement of Ago diesel, chemicals and serv icing materials 919,349,730.88 938,767,914.00 (19,418,183.12) Min of Water

101 Rehabilitation of Jarkasa Water supply scheme of Gw aram LGA. 1,085,438.00 1,085,438.00 - Stow a

102 Proposed ov erhauling of (2NO) 20KVA Generating sets at Sule tankarkar pump station in Gumel zone

1,068,750.00 888,850.00

179,900.00 Water Board

103 Proposed replacement of submersible pumps, motors and repairs of Generating sets across the State

19,789,230.00 19,566,230.00

223,000.00 Water Board

104 Proposed 2017 General rehabilitation of Water supply schemes across the state 19,110,357.00 18,694,557.00 415,800.00 Stow a

105 Rehabilitation of Limaw a & Zobiy a Water supply scheme 1,160,250.00 1,027,000.00 133,250.00 Stow a

106 Rehabilitation of Kargon Garki, Gidan maza Water supply schemes. 2,191,625.00 1,991,600.00 200,025.00 Stow a

107 Rehabilitation of Solar Water supply schemes across the state 218,875,412.50 200,133,056.15 18,742,356.35 Stow a

108 Rehabilitation of Albasu, Bango, Ajura and Zazika Water supply 3,000,000.00 1,396,500.00 1,603,500.00 Stow a

109 Rehabilitation of Water supply scheme at Jigaw a small tow n in Babura LGA 29,558,485.00 27,530,537.49 2,027,947.51 Stow a

110Supply and installation of 2NO. 650KVA basic perkins (UK assembled) at Jekarade w ater w orks, Kazaure 50,700,000.00 66,228,750.00

(15,528,750.00) Water Board

111 Upgrading small tow n w ater supply scheme at B/kudu, Dutse, Ringim and Gumel zone 96,305,581.10 89,434,800.00 6,870,781.10 Stow a

112 Proposed upgrading and Rehab of Sara w ater supply scheme in Gw aram LGA 10,360,877.92 8,613,121.67 1,747,756.25 Stow a

MINISTRY OF EDUCATION -

113 Proposed renov ation of Modibaw a and Ladduga nomadic primary schools 10,986,423.76 6,836,373.28 4,150,050.48 Nomadic edu

114 Proposed construction of Library Phase II, renov ation of auditorium and furnishing auditorium. 161,437,831.70 154,639,143.16 6,798,688.54 B U Poly Hdj

115 Proposed procurement of ICT Materials. 2,727,767.00 2,866,500.00 (138,733.00) Library Board

116 Proposed procurement and apply of Termites and Bats control chemicals for 87No: Schools in the State 12,760,000.00 12,789,000.00 (29,000.00) Min of Education

117 Proposed procurement of (560NO.) 3-seater desksw ith back rest to v arious science schools. 9,640,000.00 8,469,440.00 1,170,560.00 Min of Education

118 Proposed procurement of (180NO) Double decker beds 5,571,000.00 5,175,000.00 396,000.00 Min of Education

119

Proposed installation of 40KVAGenerator set and connection of TDN lines at technical college Ringim and Kany a

babba science School. 9,582,123.15 731,400.95 8,850,722.20 Min of Education

120 proposed purchase of ICT materials to gov ernment science technical college Ringim. 53,813,000.00 67,896,780.00 (14,083,780.00) Min of Education

121 Price of Laptop Lenov o BSO-10 Computer 275,000.00 330,000.00 (55,000.00) Scholarship Board

122 Proposed establishment of fifty four (54) remedial and eighteen (18) continiung education centres across the State 32,400,000.00 32,400,000.00 - Mass Education

123

Proposed procurement of school uniforms,3-seaterdesk and double douckerbeds to v arious senior secondry

school across the stare 28,500.00 316,595,400.00 (316,566,900.00) Min of Education

124 Jigaw a State Univ ersity K/Hausa (Variation of Works on Lot II & III). 249,269,647.78 238,484,947.28 10,784,700.50 Min of Education

125 Proposed Procurement of Library Books 15,963,200.00 15,107,100.00 856,100.00 Biny aminu Usman Poly

126 Proposed Ex ternal Works for Female Hostel (Jigaw a State Univ ersity K/Hausa) (LotIII) 68,161,368.56 68,012,138.48 149,230.08 Min of Education

127 Rehabilitation of Proposed Business Admin Block at Hadejia Biny aminu Usman Poly technic 24,726,360.18 21,953,275.50 2,773,084.68 Biny aminu Usman Poly

BAL. C/F 8,761,259,620.83 8,807,791,144.92 (46,531,524.09)

Page 19: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N PROJECT IN PROCESS QUOTED SUM DPPM RECOMMENDED SAVING/ REMARKS

(N) COST (N) INCREASE

BAL. B/F 8,761,259,620.83 8,807,791,144.92 (46,531,524.09)

128 Proposed Procurement of Students Uniform and Protectiv e Clothing for Bamaina Acadamy 3,396,000.00 2,998,540.00 397,460.00 Bamaina Acadamy

129 Proposed Procurement of ICT Equipment for Information Institute Kazaure 1,053,000.00 895,000.00 158,000.00 Reseach Institute Kazaure

130 Proposed 2017 Capital project for Islamic college Ringim. 128,362,756.33 121,603,084.18 6,759,672.15 C O I A LS Ringim

131 ProposedProcurement of Toy ota Camry (2015 Model) 15,125,000.00 13,750,000.00 1,375,000.00 J S Poly

132 Proposed Prov ision of Wi-Fi and V-Sat Internet Serv ice at B U P Hadejia (Old and New Site) 4,870,556.26 4,723,154.50 147,401.76 Biny aminu Usman Poly

133 Proposed Manufacturing and Installation of Laboratory Furniture and Fittings Against NBTE Resource Inspection 21,721,875.00 13,768,125.00 7,953,750.00 Biny aminu Usman Poly

134

Construction of 1NO.Students Hostel at GUSS M/Madori Forw arding of Request for Variation/Fluctuation of

Contract 2,189,567.11 2,189,567.11 - Mass Education

135 Proposed 2017 Capital Project for Jigaw a State Poly technic, Dutse 56,488,293.84 55,537,526.20 950,767.64 Jigaw a State Poly

136

Variation/fluctuation for the Constr. Of Block of 3-Classes Block of Ten Rooms Students Hostel, Block of

Workshop and Block of Tw in Labouratories at GSTC Ringim 34,484,588.32 3,497,009.81 30,987,578.51 Science & Tech.

137 Proposed 2016 Capital Projects for JSCOE Gumel 41,157,224.63 42,513,249.63 (1,356,025.00) J S C O E Gumel

138 Proposed Purchase of ICT Materials to Gov t Sci Tech Coll Ringim 53,811,000.00 53,053,455.00 757,545.00 Sci & Tech Sch B

139 Basic and Post Literacy Program (Allow ance/Logistics) 19,440,000.00 19,440,000.00 - Mass Education

140 Proposed Procurement of Instructional Materials 10,514,938.00 9,757,049.40 757,888.60 Mass Education

141 Proposed Ronov ation of Laboratories and ICT centre at Some Schools in the state 35,890,074.87 41,627,160.11 (5,737,085.24) Min of Education

142 Proposed Renov ation Works at GUSS Kazaure (Change of Scope) 27,302,940.04 27,277,158.53 25,781.51 Min of Education

143 Proposed Conduct of New ly Introduced Musabaqar Ilimi 2017 10,338,000.00 10,472,900.00 (134,900.00) Isl Edu Bureau

144 Proposed Construction of 6-Seater Toilet and Procurement of Books 4,499,924.00 4,864,415.19 (364,491.19) Library Board

145 Proposed General Renov ation of Gov t Unity Commercial Sec Sch Takur Dutse 105,823,610.01 112,020,852.16 (6,197,242.15) Min of Education

146 Proposed and Distribution of Items for Nomadic Primary School 25,950,000.00 29,045,625.00 (3,095,625.00) Nomadic Education

147 Proposed Supply of Tools, Equipment, Machine and Practical Materials GSTC Hadejia and GSS Ringim 19,078,500.00 15,397,252.50 3,681,247.50 Science & Tech.

148 Proposed Procurement of Sci Laboratory Equipments to GSTC Hadejia, GSS Ringim and SSS Lautai 38,678,408.00 42,813,628.83 (4,135,220.83) Science & Tech.

149 Proposed 2017 Capital Projects for informatics Institute Kazaure 111,313,763.00 95,681,157.49 15,632,605.51 Informatic Kazaure

150 Proposed Procurement of 3-Seater Desks for senior Sec Sch in the State (each) 18,250.00 21,032.81 (2,782.81)

BAL. C/F 9,532,767,890.24 9,530,738,088.37 2,029,801.87

Page 20: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N PROJECT IN PROCESS QUOTED SUM DPPM RECOMMENDED SAVING/ REMARKS

(N) COST (N) INCREASE

BAL. B/F 10,131,042,383.25 10,114,459,504.42 16,582,878.83

174 Proposed procurement of Mini printing Machine. 12,000,000.00 12,000,000.00 - Sule Lamido Univ ersity

175

Proposed prov ision of 1200MBPS internet serv ice and installation for the e-Resource centre at the Univ ersity

permanent Site. 26,995,500.00 24,601,500.00 2,394,000.00 Sule Lamido Univ ersity

176 Proposed procurement of 36 No. motorcy cles for monitoring 6,900,000.00 6,548,000.00 352,000.00 Nomadic Education

177

ProposedFood order for feeding of (500NO.) Student and pupil in Boarding Primary and Secondry Schools per

w eek. 442,280.00 454,460.00 (12,180.00) Min of Education

178

Proposed construction of centre for education Technology complex at College of Islamic and Legal Studies

Ringim (additional w ork) 6,692,100.00 6,577,636.00 114,464.00 Legal Ringim

179 Proposed 2017 Capital Projects. 10,845,000.00 14,609,150.00 (3,764,150.00) Legal Ringim

180 Proposed construction of Wall fence and general renov ation of Offices 24,401,949.16 27,364,843.73 (2,962,894.57) Scholarship Boad

181

Proposed procurement and installation of Solar pow er sy stem capable of Generating 1.5KVA for 6Hours/day (1

set) at some selected Senior Secondry Schools across the State (8no.)

8,499,750.00 6,125,490.00

2,374,260.00 Min of Education

182

Proposed procurement of kitchen utensils for distribution to v ariuos Senior Secondry Schools across the State

(8no. Location)

9,546,000.00 8,340,000.00

1,206,000.00 Min of Education

183

Contract v ariation due to fluctuation of material cost for the General renov ation of 6NO Junior staff quarters at G. G.

A. S. S. Danzomo by MESSRS: Mojaz constraction Ltd (LOT 21)

11,631,254.88 2,324,232.90

9,307,021.98 IEB

184

Contract v ariation due to fluctuation of material cost for the General renov ation of 6NO Junior staff quarters at G. G.

A. S. S. Danzomo by MESSRS: Mojaz constraction Ltd (LOT 22)

11,631,254.88 2,324,232.90

9,307,021.98 IEB

185

Proposed procurement of customized instructional, entrepreneurship/trade materials, and facilitators allow ances for

the implementation of female Teacher dev elopment scheme 4,498,875.00 4,326,400.00 172,475.00 Min of Education

186 Proposed procurement of instruction materials 4,906,912.50 4,906,912.50 - Agency for Mass Educ.

187 Actionplan for w omen functional v ocational education facilitators monthly allow nces (9 months) 4,860,000.00 4,860,000.00 - Agency for Mass Educ.

188 Proposed procurement of instructional materials (rev ised scope) 10,200,000.00 13,387,500.00 (3,187,500.00) Nomadic Education

189 Proposed improv ementof the school of preliminary studies (Phase II) (construction of w all fence) 338length 11,209,612.06 10,987,398.99 222,213.07 Sule Lamido Univ ersity

190 Propose purchase of Library Books and accreditation ex ercise 7,131,500.00 6,695,500.00 436,000.00 Informatic Inst. Kazaure

191 Proposed procurement of Laboratory equipment, Office v ehicle and Renov ation w orks 50,425,623.78 49,096,147.42 1,329,476.36 Informatic Inst. Kazaure

192 Propose purchase of (5NO.) utility v ehicles 41,067,124.89 41,067,124.89 - Sule Lamido Univ ersity

193

Proposed renov ation of classrooms at sais Hadejia and Students Hostel at Biny aminu Usman Poly technic old

campus, Hadejia 63,856,780.95 47,685,752.59 16,171,028.36 Biny aminu Usman Poly

194 Proposed conduct of 2017 QUR'ANIC recitation competition 20,147,500.00 18,968,300.00 1,179,200.00 IEB

195 Proposed construction w orks 37,359,590.72 41,340,785.75 (3,981,195.03) IEB

196 Proposed renov ation of Gov ernment Girls unity secondry school Kazaure 51,745,166.29 49,732,107.72 2,013,058.57 Min of Education

197 Proposed construction of 5NO. Hand Pumps 2,975,000.00 2,975,000.00 - Gifted Sch. Bamaina

198 Proposed procurement of sporting equipment, kitchen utensils and others. 1,976,250.00 1,938,750.00 37,500.00 Gifted Sch. Bamaina

BAL. C/F 10,572,987,408.36 10,523,696,729.81 49,290,678.55

Page 21: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N PROJECT IN PROCESS QUOTED SUM DPPM RECOMMENDED SAVING/ REMARKS

(N) COST (N) INCREASE

BAL. B/F 10,572,987,408.36 10,523,696,729.81 49,290,678.55

MINISTRY OF WORKS -

199 Proposed procurement of instructional materials 1,969,727.00 1,911,727.00 58,000.00 Gifted Sch. Bamaina

200 Proposed construction of 4NO. Classrooms block up stair, line drainage, fence and gate at Dutse capital school 32,170,996.00 29,121,858.04 3,049,137.96 Dut Model Int School

201 Proposed rehabilition and connecting of the ex isting street and scurity lights at federal Secretariat Dutse 7,630,710.15 7,630,710.15 - Min of Works

202 Rilocation of electrical instalations affected by the project (construction of Roni tow nship) 2,495,010.00 2,265,375.00 229,635.00 Min of Works

203 proposed design and construct 2 span conv entional bridge(30M long ) on Gw aram-Basirka Road 321,177,249.75 292,696,945.76 28,480,303.99 Min of Works

204 Relocation of electrical instalations affected by the project (construction of Guri tow nship Roads) 3,724,647.50 3,648,885.00 75,762.50 Min of Works

205 Relocation of electrical instalations affected by the project (construction of Kazaure tow nship Roads) 5,495,007.50 5,376,320.25 118,687.25 Min of Works

206 Relocation of electrical instalations affected by the project (construction of Mai Gatari tow nship Roads) 4,541,968.15 3,723,500.00 818,468.15 Min of Works

207 Relocation of electrical instalations affected by the project (construction of Hadejia tow nship Roads)

13,050,678.13 13,264,954.13

(214,276.00) Min of Works

208 Proposed erosion control at Koray al and Koramar Rorau Bridge. 2,173,667.00 2,173,667.00 - State Road Main Ag

209

Proposed desilting of Drainages and culv erts at Diutse, Birniw a, Jahun and Babura Local Gov ernment Head

Quarters

17,343,902.40 16,896,752.20

447,150.20 Jisepa

210 Proposed ex tension low tension (L.T) line from Police Barrack to Magistrate court in Babura 1,711,580.00 1,548,260.00 163,320.00 Electricity Board

211 Stand Alone SolarStreet LightingProject old Police Headquarter Garu Dutse (32no. Additional units) 20,912,237.64 19,196,100.00 1,716,137.64 Min of Works

212 Recolection of Water Pipelines Affected by the Project Construction of Kazaure Tow nship Road 24,540,790.00 24,302,390.00 238,400.00 Min of Works

213 Proposed Construction of Additional (4NO.) Culv erts at Taura Tow nship Road 2,912,742.00 3,566,115.00 (653,373.00) JIRMA

214 Proposed Ex tension of Electricity at Bello Bay i, Agumau and Maman w ale Ex tension Hadejia 48,619,269.93 50,746,396.06 (2,127,126.13) REB

215 Proposed Purchase of (35NO.) Gasline Generator for Distribution to Mosques in Hadejia Constituency 3,491,250.00 3,491,250.00 - REB

216

Proposed Deploy ment of (6NOS) 30KVA, Repairs of 500KVAand Purchase & Installation of 150KVA Sound Proof

Generators to gov ernment buildings.

19,688,302.50 19,113,298.50

575,004.00 REB

217 Proposed Maintenanceof Basirka Bridge on Basirka Darazo Road 2,376,585.75 2,226,829.50 149,756.25 JIRMA

218 Proposed Reclamation of Eroded Area and Construction of Drainage at Gujaba Village, Chaichai Ringim Road 5,252,499.00 4,621,155.00 631,344.00 JIRMA

219

Proposed Reclamation of Eroded Portion and Construction of Line Drain at Majia tow n, Gujungu to Ringim Road

1,514,712.00 1,746,068.61 (231,356.61) JIRMA

220

Proposed Additional Drainages Works (Drains Off Shoots to Pits Roads 3,4,5 & 6 Construction of Hadejia

Tow nship 199,191,029.00 177,848,368.32 21,342,660.68 Min of Works

221

Proposed Maintenance of Road Shoulder at Kw arin Makera along Kachi-FanisauRoad in Dutse Local Gov t. Area

(JIRMA) 2,774,077.43 2,627,072.70 147,004.73 Min of Works

222 Proposed Rehabilitation of Makaddari to Shay y a ITC Lines in M/Madori L.G.A. 8,291,563.10 8,232,658.10 58,905.00 REB

223

Proposed Construction of Reinforced Concrete Line Drainages and Culv ert (620m)at Dantanoma (Lay in

Transformer)in Gumel Tow n 14,658,653.68 20,891,855.91 (6,233,202.23) Min of Works

BAL. C/F 11,340,696,263.97 11,242,565,242.04 98,131,021.93

Page 22: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N PROJECT IN PROCESS QUOTED SUM DPPM RECOMMENDED SAVING/ REMARKS

(N) COST (N) INCREASE

BAL. B/F 11,340,696,263.97 11,242,565,242.04 98,131,021.93

224

Relocation of Solar Pow ered Pumps w ater facility Affected By the Project Construction of Kazaure Tow nship

Roads 1,536,285.82 1,229,932.19 306,353.63 Min of Works

225

Construction of Kw anar Dundu-Bulangu Road (Upgrading From 2nd Coat Surface Dress Road toAsphaltic Concret

Ov erlay ) (additional w ork) 992,067,536.25 1,135,326,386.25 (143,258,850.00) Min of Works

226 Proposed Construction Kaugama-Turmi Gujungu feeder Road (21KM) 434,434,444.92 389,684,446.20 44,749,998.72 Min of Works

227 Proposed Maintenance of Hy draulic Structures of Hantsu-Miga-Dangy atin Road (JIRMA) 9,393,210.75 10,285,380.00 (892,169.25) Min of Works

228

Proposed Maintenance and Construction of Drainage Along B/kudu-Jiboga Road and Zarainaw a Quarters in

B/kudu Local Gov t Area 216,203,557.50 197,831,938.50 18,371,619.00 Min of Works

229 Relocation of Electrical Installations Affected by the Project (Construction of M/Madori Tow nship Roads 5,597,822.50 4,803,670.70 794,151.80 Min of Works

230 Relocation of Pipe Reticulation /Borehole Affected by the Road Project at Kore Tow n 3,626,262.00 3,742,172.00 (115,910.00) Min of Works

231 Relocation of Water Pipelines Affected by the Project (Construction of M/madori Tow nship Roads) 11,220,313.17 8,696,597.32 2,523,715.85 Min of Works

232 Relocation of Water Pipelines Affected by the Project (Construction of Guri Tow nship Roads) 16,278,258.05 13,606,376.95 2,671,881.10 Min of Works

233 Relocation of Electrical Installations Affected by the Project (Construction of K/Hausa Tow nship Roads) 3,071,929.33 2,721,929.33 350,000.00 Min of Works

234

Change of Scope (Supply and Installation of (100 Unit) Stand Alone Solar Street Lighting at Kany a Babba and old

Police Headquater-Garu Dutse 63,283,500.00 63,283,500.00 - Min of Works

235 Proposed procurement of 1NO. 75KVA Generator for Gov ernors Officials lodgeat Ikeja G.R.A. Lagos 3,900,000.00 3,700,000.00 200,000.00 Min of Works

236 Proposed construction of Harbo Road (1.52KM) 220,689,099.49 166,462,827.79 54,226,271.70 Min of Works

237 Construction of Malam madori Tow nship Road (additional w orks) 386,561,885.85 374,134,938.89 12,426,946.96 Min of Works

238 Proposedex tension of Electricity at Andaza Tow n, Kiy aw a Local Gov ernment area 31,721,329.31 31,721,329.31 - REB

239 Proposed rehabilitation and upgrading of Aujara access Road (1.65KM) 96,265,876.22 96,860,399.34 (594,523.12) Min of Works

240

Proposed construction of reinforced concrate Block line Drainage and Culv ert at Aujara Bakin kasuw a and Tsigi

(1650M) 63,742,171.31 63,238,372.91 503,798.40 Min of Works

241 Proposed electrification Project at Katurje in Kafin hausa Local Gov ernment Area 11,020,422.65 10,916,014.48 104,408.17 REB

242 Proposed integrated stand-alone Solar street Lighting (130No) project at Jigaw a Dan ali, Babura L.G.A. 84,691,365.41 82,515,030.41 2,176,335.00 Min of Works

243 Proposed integrated stand-alone Solar street Lighting (150No) project at Jahun L.G.A. 97,695,363.94 95,192,688.94 2,502,675.00 Min of Works

244 Proposed integrated stand-alone Solar street Lighting (150No) project at Danzomo, Sule Tankarkar L.G.A. 84,691,365.41 82,515,030.41 2,176,335.00 Min of Works

245 Proposed Potholes patching along Sara-Gantsa-Girinbo Road, Buji Local Gov t Area 22,287,616.30 21,061,451.25 1,226,165.05 JIRMA

246 Relocation of Electrical installations affected by the construction of Roni Tow nship Roads 827,775.00 649,425.00 178,350.00 Min of Works

247

Proposed ex cav ation and concrate filling of ongoing Water reticulation in Gumel, Banura and Ringim

carriagew ay s 1,254,823.16 1,254,823.16 - JIRMA

248 Relocation of Water Pipelines affected by the construction of Maigatari Tow nship Roads 9,623,488.35 9,177,535.50 445,952.85 Min of Works

249 Relocation of Water Pipelines affected by the construction of Jahun Tow nship Roads 8,882,910.00 8,028,307.50 854,602.50 Min of Works

BAL. C/F 14,221,264,876.66 14,121,205,746.37 100,059,130.29

Page 23: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N PROJECT IN PROCESS QUOTED SUM DPPM RECOMMENDED SAVING/ REMARKS

(N) COST (N) INCREASE

BAL. B/F 14,221,264,876.66 14,121,205,746.37 100,059,130.29

250 Relocation of Water Pipelines affected by the project (construction of RoniTow nship Roads Phase II) 2,025,700.00 1,756,702.00 268,998.00 Min of Works

251

Proposed electrification Project to Gurunga/Maja tow n in 29 Constituency across the State (Additional No.30)

(Dutse) 36,909,496.48 36,920,790.22 (11,293.74) REB

252 Maintenance of failed spots on Malam madori-Dolenkw ana-Birniw a and Dolenkw ana-G/Gabas-Hadejia Roads 2,272,725.00 2,013,375.00 259,350.00 JIRMA

253 Maintenance of failed spots on Kw anar-Roni-Roni-Takw ardaw a Road 1,428,196.00 1,282,160.25 146,035.75 JIRMA

254 Proposed electrification Project at Gw iw a and Kafin hausa Local Gov ernment Area 52,045,049.59 50,745,578.65 1,299,470.94 JIRMA

255 Proposed rehabilitation of Karnay a-Dundubus ITC line Dutse Local Gov ernment Area 5,357,383.00 5,114,056.50 243,326.50 REB

256 Proposed electrification Projects to (No.29) Tow n in 29 Constituency across the State 1,219,203,181.43 1,214,311,482.00 4,891,699.43 REB

257 proposed procurement of Uniform materials, protectiv e Clothes and accessories. 3,840,000.00 3,840,000.00 - Fire Serv ice

258 Proposed construction of Limaw a-Galamaw a Feeder Road (2.2KM) (Dutse L.G.A.) (upgrading) 89,212,318.25 87,185,923.24 2,026,395.01 Min of Works

259 Proposed construction of Takur-Jaudi Feeder Road (4.5KM) (Dutse L.G.A.) (new ) 101,585,893.50 78,896,311.20 22,689,582.30 Min of Works

260 Proposed supply and installation of stand-alone Solar street Lighting at state Secretariate, Dutse. 33,361,650.00 33,361,650.00 - Min of Works

261 Proposed supply and installation of stand-alone Solar street Lighting at Commisioner's Quarters. 33,361,650.00 31,773,000.00 1,588,650.00 Min of Works

262 Proposed Reconstruction and ov erlay of Gadadin Junction-Kachi Road (0.25KM), Dutse 36,359,415.86 26,733,168.63 9,626,247.23 Min of Works

263 Re-construction and ov erlay of Unity pentagon round about-Dasina Junction Road (0.5KM). 71,493,548.49 70,942,298.85 551,249.64 Min of Works

264 Construction of perimeter Road, runw ay ex it and access Road to apron, Dutse Air port. 998,537,518.00 698,813,272.86 299,724,245.14 Min of Works

265 Proposed replacement of 1NO. Transformer at Kafin Fulani in Gw aram Local Gov t Area 5,727,121.29 4,515,627.86 1,211,493.43 REB

266 Erosion control at Koray al and Koramar Rorau Unguw ar Mani - Koray al Road 12,164,294.63 12,164,294.63 - JIRMA

267 Proposed repair of Toy ota Hilux (JG10-G01) 522,500.00 450,000.00 72,500.00 JIRMA

268 Proposed repair of (6NO.) fire fighting Vehicles and Ambulance 4,126,100.00 4,126,100.00 - Director Fire Serv ice

269 Proposed relocation of Electrical installations affected by the M/madori tow nship road project. 9,009,200.00 7,365,900.00 1,643,300.00 Min of Works

270 Proposed construction of Failed section along Jahun Gujungu Road. 195,476,043.13 175,792,455.30 19,683,587.83 JIRMA

271

Proposed construction of reinforce concrete line Drainages and Culv ert (600m) at Dantanoma (Lay in transformer)

in Gumel tow n (PHASE II) 24,290,347.76 24,290,347.76 - Min of Works

272

Proposed construction of line Drain (2.56KM), ring Culv ertand access slabs at Gida dubu Yadin Dutse in Dutse

Local Gov t Area 96,606,796.61 96,606,796.61 - JIRMA

273

Proposed construction of reinforce concrete line Drainages and Culv ert (620m) at Dantanoma (Lay in transformer)

in Gumel tow n. (phase 1) 18,993,645.65 18,993,645.65 - Min of Works

274 Proposed maintenance of Kaugama Fly ov er 7,755,562.50 7,687,302.00 68,260.50 JIRMA

275 Desilting of lineDrain at Danzomo, Kanar Med u- Danzomo Road. 1,178,541.00 1,091,748.52 86,792.48 JIRMA

276

Proposed Tow nship Electrification distribution netw ork and inter Tow n connections at Nasaraw a, Karkasara

Quarters and Mai dubara to G/Malam inGumel L.G.A. 104,307,151.22 84,651,885.99 19,655,265.23 REB

277 Relocation of Water Pipelines affected by the project. (construction of Roni tow nship Roads) 1,788,357.50 1,879,455.38 (91,097.88) Min of Works

BAL. C/F 17,390,204,263.55 16,904,511,075.47 485,693,188.08

Page 24: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N PROJECT IN PROCESS QUOTED SUM DPPM RECOMMENDED SAVING/ REMARKS

(N) COST (N) INCREASE

BAL. B/F 17,390,204,263.55 16,904,511,075.47 485,693,188.08

278 Proposed Urban Tow ns Streetlight installations monthly maintenance supplies. 88,823,200.00 88,171,250.00 651,950.00 Min of Works

279 Relocation of Water Pipelines affected by the project. (construction of Hadejia tow nship Roads) 18,632,806.75 18,149,884.21 482,922.54 Min of Works

280 Proposed Electrification Rehabilitation of ITClines across the 12 Villages in Kafin Hausa L.G.A. 8,162,148.85 10,773,425.00 (2,611,276.15) REB

281 Rehab of Gumel - Gujungu road 16,545,060.00 17,137,260.00 (592,200.00) JIRMA

MINISTRY OF ENVIRONMENT -

282 Proposed seedling production activ ities. 11,129,000.00 11,084,250.00 44,750.00 Min of Env ironment

283 Proposed clearanceof thy pha grass along riv er Hadejia 11,291,500.00 11,291,500.00 - Min of Env ironment

284 Proposed seedling production activ ities. 8,821,800.00 8,933,198.00 (111,398.00) Min of Env ironment

285 Proposed construction of w all fance at Hadejia Nursery . 8,927,237.34 8,839,037.45 88,199.89 Min of Env ironment

286 Proposed Construction of 3NO. Drainages in the State 46,729,691.63 69,126,837.85 (22,397,146.22) Min of Env

287 Proposed Workshop on Conv ersion of Municipal and Agricultural Waste to Health 1,390,000.00 1,286,000.00 104,000.00 Min of Env

288 Proposed Malaria v ector control at G/dugus and Wangara Wards in Dutse Local Gov t Area 809,400.00 778,200.00 31,200.00 Min of Env ironment

289 Proposed construction of Drainage at Sabon gari Quarters in Birnin kudu Local Gov t Area 34,367,855.92 32,461,026.92 1,906,829.00 Min of Env ironment

290

Proposed construction of Drainage at Dumadumin toka, Kafin hausa Local Gov t Area. (Constituency project 2017). 26,012,710.64 25,333,736.01

678,974.63 Min of Env ironment

291 Proposed procurement of 1NO. Utility Vehicle. 10,000,000.00 18,500,000.00 (8,500,000.00) Min of Env ironment

292

Proposed procurement of Malaria/Vector control accessories for use at 14NO. L.G.A. across the State 4,995,400.00 4,855,400.00

140,000.00 JISEPA

293 Proposed flood and erosion control at Ashuran Chiroma Tow n, Kafin hausa Local Gov t Area. 28,744,809.02 21,101,815.80 7,642,993.22 Min of Env ironment

294 Proposed construction of Drainage at Achauy a Tow n in Sule tankarkar Local Gov t Area. 12,017,528.27 12,017,528.27 - Min of Env ironment

295 Proposed Moringa Oliefera Seedling (NO. 500,000) 10,278,100.00 8,402,600.00 1,875,500.00 Min of Env ironment

296 Proposed flood and erosion control at Chamo, Galamaw a and Garu in Dutse Local Gov t Area. 179,962,777.00 179,962,777.00 - Min of Env ironment

297 Proposed construction of Drainage at Babaldu and Zango Kw arin aw aja in Birnin kudu Local gov ernment 42,716,398.15 56,839,408.01 (14,123,009.86) Min of Env ironment

298

Proposed construction of Drainage (1.53KM both sides at Yalleman Tow n in Kaugama L.G.A. (constituency

project).

56,839,408.01 56,839,408.01

- Min of Env ironment

299

Proposed construction of Drainage (Phase II) at Basirka Tow n, Fagam constituency ) Gw aram Local Gov ernment 8,754,328.48 8,236,787.42

517,541.06 Min of Env ironment

300

Proposed establishement of 10KM Shelterbelt at Babura, Maigatari, Kaugama and Birniw a Local Gov ernment

areas

10,422,000.00 9,436,500.00

985,500.00 Min of Env ironment

301

Proposed construction of Drainage (670M) at Makara dudu in Hadejia Local Gov ernment (2017 Constituency

project).

16,046,121.26 17,083,086.46

(1,036,965.20) Min of Env ironment

302 Proposed reclamation w ork at Iggi Tow n,Birnin Kudu Local Gov ernment Area 7,308,000.00 5,052,600.00 2,255,400.00 Min of Env ironment

303 Proposed construction of Drainage at Dandidi and Medi tow n in Gagaraw a Local Gov ernmet 74,466,201.00 65,658,630.09 8,807,570.91 Min of Env ironment

304 Proposed constr of 2n. Drainages at B/kudu 142,489,983.31 130,779,385.50 11,710,597.81 Min of Env ironment

BAL. C/F 18,134,397,745.87 17,671,863,221.97 462,534,523.90

Page 25: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N PROJECT IN PROCESS QUOTED SUM DPPM RECOMMENDED SAVING/ REMARKS

(N) COST (N) INCREASE

BAL. B/F 18,134,397,745.87 17,671,863,221.97 462,534,523.90

MINISTRY OF LAND -

305 Proposed Renov ation of Hon. Commissioners Official Recsidences (4NO.) at Commissioners Quarters, Dutse 15,582,854.78 14,862,773.30 720,081.48 Min of Land

306

Proposedconstruction of Boy s Quarters, w all fence Culv erts and Drainages at SSG and Head of Serv ice's Official

residences

42,997,026.48 44,429,367.30

(1,432,340.82) Urban Dev Board

307 Proposed Dev elopment contol activ ities (B) 65,240,000.00 55,740,000.00 9,500,000.00 Urban Dev Board

308 Proposed refurbushing of Plants and v ehicles (11no.) 8,996,505.00 8,961,017.05 35,487.95 Urban Dev Board

309 Proposed Dev elopment contol activ ities (A) 3,760,000.00 3,585,000.00 175,000.00 Urban Dev Board

CABINET OFFICE -

310 Proposed Construction of Juma'at mosques constituency projects across the state. 76,804,407.90 74,850,971.95 1,953,435.95 Cabinet Office

311 Proposed Furnishing and Equipping of Duputy Gov ernors Lodge Abuja 38,785,950.00 31,042,200.00 7,743,750.00 Cabinet Office

312 Completion of Friday Mosque Constituency projects across the state 39,806,237.15 43,087,517.98 (3,281,280.83) Cabinet Office

313 Proposed Construction of Grav e y ard and Juma'at mosque across the state 66,958,742.13 63,075,182.24 3,883,559.89 Cabinet Office

314 Proposed Repairs of (13NO) Prisons Operational Vehicles 7,847,000.00 8,004,000.00 (157,000.00) Cabinet Office

315 Proposed Maintenance/Upgrading 27NO. Local Gov tCouncils Radio Stations (Wireless/Ov er) 6,465,000.00 6,314,000.00 151,000.00 Cabinet Office

316

Proposed Furnishing, Wall Fence and Landscaping of Deputy Gov ernors Guest House at Kasarau Quarters,

Dutse 19,967,452.00 17,434,619.63 2,532,832.37 Cabinet Office

317 Proposed Recreational Park Dutse 66,946,320.00 66,058,583.78 887,736.22 Cabinet Office

318 Proposed completion of Daily and Juma'at Mosques Constituency Projects across the state. 80,707,271.20 74,590,266.43 6,117,004.77 Cabinet Office

319 Proposed construction of Mosquees (Second and Third Quarter 2017 constituency project) Gw iw a + taura 25,627,358.82 23,498,764.61 2,128,594.21 Cabinet office

320

Construction of3No. Juma'at Mosques at Stabare, Dandi and Tofa Gidan Sani in Ringim constituency by Messrs:

Engineering & multy Serv ices Limited (Additional w ork)

1,089,126.00 1,086,246.00

2,880.00 Cabinet office

321 Constr/completion of Juma'at mosque (4no.) at Birniw a, Buji, Yankw ashi and Kany a 67,316,462.37 65,208,796.32 2,107,666.05 Cabinet office

322 Construction of (24no) mosque Second and Third Quarter 2017 constituency project) 322,242,457.09 319,574,391.91 2,668,065.18 Cabinet office

323 Proposed construction of Gov ernor's Lodge Kaduna 173,166,103.54 149,329,225.82 23,836,877.72 Cabinet office

324 Rehabilitation of Islamiy y a School at Nassaraw a, Birnin kudu Local Gov ernment Area. 947,100.00 1,087,975.00 (140,875.00) Cabinet office

325 Completion of 3NO Mosque in the State (Takur Dutse, Kakudi in S/tankarkar & Kw atalo in K/Hausa) 26,803,046.80 26,803,722.80 (676.00) Cabinet office

326 Proposed supply of Furniture for the new ly acquired apartment in Asokoro 1,387,000.00 1,380,528.00 6,472.00 SSG Office

327 Proposed bituminous felt roofing and other renov ations at Dutse central Mosque 11,954,414.33 21,347,021.47 (9,392,607.14) SSG Office

328 Renov /Completion of Jumaat mosque at Danzaina in Taura LG. 8,152,066.99 8,152,066.99 - Cabinet office

329 Renov /Completion of (4no.) Jumaat mosques at K/kasamma tow n, Sunkuy e, Suga and GalambiCentral Mosque 37,478,314.79 38,076,833.88 (598,519.09) Cabinet office

330 Renov /completion of mosque at Maigatari, Ringim, Yankw ashi and Kaugama Constituencies 39,693,307.83 38,409,071.54 1,284,236.29 Cabinet office

MINISTRY OF AGRICULTURE -

331 Proposed Procurement of Veterinary Drugs for the Control of Disease in Goat 2,250,000.00 2,150,000.00 100,000.00 Min of Agriculture

332 Proposed Areal Spray for the Quelea Birds 6,300,000.00 6,300,000.00 - Min of Agriculture

333 Proposed Procurement of Field, Laboratories and Library Equipments 2,180,000.00 2,125,000.00 55,000.00 Mineral Resources

334 Proposed procurement of Animal v accines, v accination inputs and accessories. 7,609,500.00 6,234,500.00 1,375,000.00 Min of Agriculture

BAL. C/F 19,409,458,771.07 18,894,662,865.97 514,795,905.10

Page 26: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N PROJECT IN PROCESS QUOTED SUM DPPM RECOMMENDED SAVING/ REMARKS

(N) COST (N) INCREASE

BAL. B/F 19,409,458,771.07 18,894,662,865.97 514,795,905.10

335 Proposed construction of Solar porw ered borehole base (semiconduit) Irrigation sy stem for 25 HA module 52,884,295.54 50,621,838.75 2,262,456.79 Min of Agriculture

336 Proposed procurement of IT/surv ey equipments 1,840,000.00 1,446,000.00 394,000.00 Min of Agriculture

337 Stoking of Water bodies (Reserv oirs/Dams) across the State w ith Fish fingerlings 9,030,000.00 9,030,000.00 - Min of Agriculture

338 Proposed procurement of IT/surv eillance equipment and registration of poultry Farms 1,876,500.00 1,414,500.00 462,000.00 Min of Agriculture

339 Proposed Constr of Solar Pow ered Borehole base Irrigation scheme (DRIP) Irrigation sy stem for 25 HA Module 94,465,550.00 84,739,803.75 9,725,746.25 Min of Agriculture

340

Proposed constr of Solar Pow ered Borehole base (semi conduit) Irrigation scheme (DRIP) Irrigation sy stem for 25

HA Module

52,884,295.54 50,621,838.75

2,262,456.79 Min of Agriculture

DIRECTORATE OF ECONOMIC EMPOWERMENT -

341

Procurement of thirty (30) v ehicles to be distributed on loneto national union of road transport w orkers (NURTW)

Jigaw a State chapter (riv ised cost)

82,500,000.00 82,500,000.00

- Dir of Economic Emp.

342 Proposed purchased of (3NO) HP Computers (Laptop) 487,000.00 487,000.00 - Dir of Economic Emp.

343

Proposed procurement of 27NO. Qlink Motorcy cles to be distributed on loan to Local Gov ernment y outh

empoerment co-odinator

7,212,500.00 7,120,000.00

92,500.00 Dir of Economic Emp.

344 Proposed Procurement of Machines & Farm Implements for Distribution to Farmers on Loan 95,610,200.00 94,610,200.00 1,000,000.00 Dir of Economic Emp.

345

Proposed Procurement of Six ty (60NO) Motorcy cles and Drugs to be Distributed on Loan for Mobile Veterinary

Serv ice

17,223,700.00 15,125,700.00

2,098,000.00 Dir of Economic Emp.

346

Proposed Procurement of Thirty (30NO) Vehicles to be Distributed on Loan to Nigerian Association of Road

Transport Ow ners (NARTO) Jigaw a State Branch (Tukumbo Buses)

94,050,000.00 94,050,000.00

- Dir of Economic Emp.

347 Proposed Fabrication of (50 Units) Rice Threshers by local mechanics 8,141,000.00 7,901,000.00 240,000.00 Dir of Economic Emp.

348

Proposed procurement of Paddy threshers and Rice milling Machine to be giv en on loan to Youth 28,430,000.00 28,430,000.00

- Dir of Economic Emp.

349

Proposed procurement of multi-function Rice milling Machine to be distributed on loan to Farmers 8,000,000.00 8,000,000.00

- Dir of Economic Emp.

350

Proposed procurement of Six ty (60NO.) Motorcy cles and drugs to be distributed on loan to Mobile v eterinary

serv ice

24,522,000.00 22,422,000.00

2,100,000.00 Dir of Economic Emp.

351 Proposed construction of cottage Rice processing Mill in (6NO.) locations across the State (each) 14,364,783.15 14,103,352.11 261,431.04 Dir of Economic Emp.

MINISTRY OF JUSTICE -

352 Proposed installation of CCTV at Courtof Justice and hon chief judges residence Dutse 9,946,882.00 8,473,500.00 1,473,382.00 High Court of Justice

353 Proposed fueling and maintenance of high court Generator set (650KVA). 22,928,325.00 20,877,675.00 2,050,650.00 High Court of Justice

354 Proposed of 1NO. Toy ota Prado Jeep (2016 model) and 4NO. Toy ota camry (2015 model) 94,906,064.50 94,906,064.50 - High Court of Justice

355 Proposed Establishment of E-Library , Procurement of Law Reports Tools and Applications 9,975,000.00 9,730,000.00 245,000.00 Min of Justice

356 Purchase of Office Furniture and Equipments 3,984,200.00 3,999,200.00 (15,000.00) Judicial Serv ices

357 Purchase Pool Utility Vehicle (KIA Optima 2.0L EX) (1no) 12,000,000.00 12,000,000.00 - Judicial Serv ices

358 Purchase of Office Furniture and Equipments 4,134,200.00 4,017,200.00 117,000.00 Judicial Serv ices

359 Procurement and Installation of 100KVA Generator at the Chief Judge Residence, Dutse (1no.) 7,000,000.00 7,000,000.00 - Higher Court

BAL. C/F 20,167,855,266.80 19,628,289,738.83 539,565,527.97

Page 27: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N PROJECT IN PROCESS QUOTED SUM DPPM RECOMMENDED SAVING/ REMARKS

(N) COST (N) INCREASE

BAL. B/F 20,167,855,266.80 19,628,289,738.83 539,565,527.97

360

Proposed construction of Boy s Quarters, w all fence, gate House, borehole, procurement of Furnitures and

renov ation of the proposed Guest House for the High court 25,932,052.61 25,759,827.35 172,225.26 High Court of Justice

361 Proposed purchase of 1No. House at Fatara Housing Estate 15,918,585.20 15,918,585.20 - High Court of Justice

362

Procurement and installation of (1No.) 50KVA Perkin's Sound proof Generator (UK assembled) at the Official

residence of Hon. Grand Kadi 5,300,000.00 5,300,000.00 - Sharia Court of Appeal

363 Completion of Juv enile prison, Gate lodge, Mosque, Class room and perimeter w all at Babura (rev ised scope) 63,557,957.76 58,485,504.30 5,072,453.46 Min of Justics

364 Proposed construction of chamo and y alo shariah courts 43,195,185.37 42,561,989.42 633,195.95 Sharia Court

365 Proposed Repair of (3N0) Utility v ehicles. 493,000.00 493,000.00 - Min of Justice

366 Proposed renov ation of Gw aram, Malam madori upper shari'ah court and madana shari'ah court. 14,002,627.31 13,016,228.30 986,399.01 Sharia Court

MINISTRY OF COMMERCE -

367 Proposed Purchase of Tourism Promotional Equipment and Printing of Tourist Guide Handbook 1,790,000.00 1,790,000.00 - Min of Commerce

368 Proposed Renov ation/Rehabilitation of 3-Star Hotel, Dutse 528,553,245.49 431,823,431.40 96,729,814.09 Min of Commerce

369 Proposed Supply of Hotel Furniture and Electronis at 3-Star Hotel, Dutse 178,855,665.00 152,326,700.00 26,528,965.00 Min of Commerce

370 Proposed renov ation of Maigatari ex port processing Zone (EPZ) (Rev ised cost) 151,764,940.69 166,924,996.90 (15,160,056.21) Min of Commerce

371

Proposed procurement of Office Furniture at House near Gov ernment House for Local Technical unit of Zinder-

Daura-Jigaw a-Kano trade corridor 2,960,500.00 3,554,000.00 (593,500.00) Min of Commerce

372 Proposed conduct of Baseline surv ey of artisanal miners/activ ities in 14LGA's in the State 2,874,600.00 1,664,300.00 1,210,300.00 Mineral Resources

MANPOWER DEVELOPMENT INSTITUTE (MDI) -

373

Proposed Supply of Furniture and Electronics to New ly Built Guest Facilities (Chalets and Main Bulding) at

Manpow er Dev elopment Institute Dutse 199,027,500.00 244,300,140.00 (45,272,640.00) MDI

374 Proposed construction of Laundry , store and ex ternal w ork for Electrical pow er supply 104,828,412.94 100,570,724.52 4,257,688.42 MDI

375

Supply and installation of funiture and Electronics for the new Guest's facilities at Manpow er dev elopment Institute

(additional w ork) 3,000,000.00 3,000,000.00 - MDI

376

Supply and installation of funiture and Electronics for the new Guest's facilities at Manpoer dev elopment Institute

(change of scope) 7,800,000.00 7,700,000.00 100,000.00 MDI

JIGAWA STATE HOUSE OF ASSEMBLY -

377 Request for benchmark price 206,453,099.00 206,453,099.00 - House of Assembly

378 Proposed Prov ision of Street Light at the Legislativ e Quarters Dutse 4,620,347.08 3,855,333.35 765,013.73 House of Assembly

379 Proposed procurement of 1NO. Ford ex plorer XTL leather. 33,993,750.00 33,993,750.00 - House of Assembly

380 Proposed Constr, Renov ation & Supplies at Legislativ e offices and Residence, Dutse. 70,308,670.02 68,438,821.79 1,869,848.23 House of Assembly

381 Proposed procurement of v ehicle, laptop, printer.and scanner. 28,228,691.40 28,228,691.40 - House of Assembly

382 Procurement of v ehicles. 8,844,150.00 8,844,150.00 - House of Assembly

BAL. C/F 21,870,158,246.67 21,253,293,011.76 616,865,234.91

Page 28: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N PROJECT IN PROCESS QUOTED SUM DPPM RECOMMENDED SAVING/ REMARKS

(N) COST (N) INCREASE

BAL. B/F 21,870,158,246.67 21,253,293,011.76 616,865,234.91

MINISTRY OF FINANCE AND ECONOMIC PLANNING -

383 Propsoed supply of office furniture and equipment. 8,339,750.00 10,238,812.00 (1,899,062.00) Min of finance

384 Proposed procurement of someOffice equipments 4,765,278.00 4,186,960.00 578,318.00 Min of finance

MINISTRY OF JUSTICE -

385 Proposed installation of CCTV at Courtof Justice and hon chief judges residence Dutse 9,946,882.00 8,473,500.00 1,473,382.00 High Court of Justice

386 Proposed fueling and maintenance of high court Generator set (650KVA). 22,928,325.00 20,877,675.00 2,050,650.00 High Court of Justice

387 Proposed of 1NO. Toy ota Prado Jeep (2016 model) and 4NO. Toy ota camry (2015 model) 94,906,064.50 94,906,064.50 - High Court of Justice

388 Proposed Establishment of E-Library , Procurement of Law Reports Tools and Applications 9,975,000.00 9,730,000.00 245,000.00 Min of Justice

389 Purchase of Office Furniture and Equipments 3,984,200.00 3,999,200.00 (15,000.00) Judicial Serv ices

390 Purchase Pool Utility Vehicle (KIA Optima 2.0L EX) (1no) 12,000,000.00 12,000,000.00 - Judicial Serv ices

391 Purchase of Office Furniture and Equipments 4,134,200.00 4,017,200.00 117,000.00 Judicial Serv ices

392 Procurement and Installation of 100KVA Generator at the Chief Judge Residence, Dutse (1no.) 7,000,000.00 7,000,000.00 - JS Higher Court

393 Proposed construction of chamo and y alo shariah courts 43,195,185.37 42,561,989.42 633,195.95 Sharia Court

394 Proposed Repair of (3N0) Utility v ehicles. 493,000.00 493,000.00 - Min of Justice

395 Proposed renov ation of Gw aram, Malam madori upper shari'ah court and madana shari'ah court. 14,002,627.31 13,016,228.30 986,399.01 Sharia Court

MINISTRY OF INFORMATION -

396 Proposed supply and installation of diesel Generating set (150KVA sound proof 7,500,000.00 7,500,000.00 - Min of information

397 Upgrading of Dutse Stadium (Changeof Scope) 524,794,441.42 524,794,441.42 - Min of Information

398

Proposed Construction of Production Hall, Renov ation of Ex isting Structure and Supply of Printing Equipment at

Jigaw a State Printing Press 353,257,958.50 342,380,253.30 10,877,705.20 Min of Information

399 Proposed Purchase of Motorcy cles (Box er/Bajaj) (6no.) 1,680,000.00 1,470,000.00 210,000.00 Min of Information

400 Proposed procurement of 1NO. Toy ota Hilux engine and 6NO. Motorcy le. 3,445,000.00 3,165,000.00 280,000.00 Min of information

401 Proposed procurement of AM &FM Radio station spare parts. 22,246,961.82 20,380,500.00 1,866,461.82 Min of information

402 Proposed constr of corpers lodge 6no. Bungalow of 3-bedroom each 10,590,042.00 12,949,288.01 (2,359,246.01) Min of information

MINISTRY OF WOMEN AFFAIRS -

403 Proposed procurement of Equipment 1,865,000.00 2,741,000.00 (876,000.00) Min of Woman Aff

404 Proposed Renov ation Worksat Women Dev elopment CentreDutse 9,367,862.72 11,428,016.84 (2,060,154.12) Min of Women Affairs

405 Proposed Fabrication of (7500 Units) Improv ed Wood Economy Stov es 10,185,000.00 10,185,000.00 - Alternativ e Energy

406 Proposed Purchase of Solar Spare Parts for the Maintenance of the Ex iisting Solar Villages Across the State 9,815,000.00 9,165,000.00 650,000.00 Alternativ e Energy

407 Proposed Supply of 1000 Metric Tons of Maize to Jigaw a State 196,875,000.00 196,875,000.00 - Rehabilitation Board

BAL. C/F 23,257,451,025.31 22,627,827,140.55 629,623,884.76

Page 29: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N PROJECT IN PROCESS QUOTED SUM DPPM RECOMMENDED SAVING/ REMARKS

(N) COST (N) INCREASE

BAL. B/F 23,257,451,025.31 22,627,827,140.55 629,623,884.76

GOVERNMENT HOUSE -

408 Proposed price of v ehicles 15,300,000.00 19,753,125.00 (4,453,125.00) Gov t House

409 Procurment of (1no.) Toy ota Prado (2015 model) 24,912,990.00 24,912,990.00 - Gov t House

410 Procurement of (1NO) Toy ota Lex us jeep (2010 Model) (Armoured) 35,000,000.00 35,000,000.00 - Gov t House

OFFICE OF THE AUDITOR GENERAL -

411

Proposed Renov ation of AuditArea Offices, Refurbishing of Official Vehicles Procurement of Motor Cy cles 25,046,301.40 23,063,306.05

1,982,995.35 Auditor General

-

MINISTRY FOR LOCAL GOVT -

412 Proposed construction of Office at Birnin kudu and Ringim Local Gov t Area (2018) 31,806,614.36 34,465,480.24 (2,658,865.88) Local Gov t Audit

TOTAL 23,389,516,931.07 22,765,022,041.84 624,494,889.23

Page 30: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

SECTION ( D )

CONTRACTS AWARDED

JANUARY TO DECEMBER, 2017

Page 31: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD

(N)

WORKS1 24/01/2017 Constr. of Juma'at Prayer Mosque at Galambi, fagam Constituency in Gwaram LGA. FGPC/1/2017/VOL.1/5 Ramadan Constr. Nig. Ltd. 26,396,975.14 Cabinet Office 16 weeks

2 24/01/2017 Constr. of Juma'at Prayer Mosque at Tauran Gabas and Yalwa in Kaugama Constituency. FGPC/2/2017/VOL.1/5 Lungun Fulani Nigeria Ltd. 4,461,077.19 Cabinet Office 8 weeks

3 24/01/2017 Constr. of Juma'at Prayer Mosque at Amanga in Sule-Tankarkar Constituency. FGPC/10/2017/VOL.1/5 Umar Co. Roofing Products 9,164,435.46 Cabinet Office 8 weeks

4 24/01/2017 Constr. of Juma'at Prayer Mosque at Umadu in Miga Constituency. FGPC/4/2017/VOL.1/5 AMIA Integrated Services Ltd. 5,073,163.14 Cabinet Office 6 weeks

5 24/01/2017 Constr. of Juma'at Prayer Mosque at Medu in Gagarawa Constituency. FGPC/8/2017/VOL.1/5 Umar Co. Roofing Products 25,853,039.07 Cabinet Office 16 weeks

6 24/01/2017 Constr. of Juma'at Prayer Mosque at Kukuma yamma and Gubabiya in Buji Constituency. FGPC/7/2017/VOL.1/5 Loyalty Properties Nig. Ldt. 5,613,871.72 Cabinet Office 6 weeks

7 24/01/2017 Constr. of Juma'at Prayer Mosque at Fagwalayi in Jahun Constituency. FGPC/6/2017/VOL.1/5 Na-bakwai Gen. Enterprises 5,534,474.56 Cabinet Office 6 weeks

8 24/01/2017 Constr. of Juma'at Prayer Mosque at Gorumo and Jibanin in Kiyawa Constituency. FGPC/9/2017/VOL.1/5 Damastbo Ventures Ltd. 10,146,326.28 Cabinet Office 6 weeks

9 24/01/2017 Constr. of Juma'at Prayer Mosque at Kwajali in Taura Constituency. FGPC/3/2017/VOL.1/5 Nushe Business Resources 7,059,894.75 Cabinet Office 6 weeks

10 1/2/2017

Constr. of Hand pumps Water Supply Schemes as Constitutuency Projects at Sabuwar unguwa,

Kurket G/Dabo, Roran Fulani, Daba Yamma and Kawti in Gwiwa Constitutuency FGPC/13/2017/VOL.1/6 Isah Halilu Nig. Ltd. 2,762,025.00 Min. of Water Resources 8 weeks

11 1/2/2017 Constr. of Solar Powered water supply scheme at Santar Hayo in Gwiwa Constituency. FGPC/12/2017/VOL.1/6 Isah Halilu Nig. Ltd. 6,176,625.00 Min. of Water Resources 8 weeks

12 14/2/2017 Improvement of Kazaure Town Water Supply (Additional works) FGPC/25/2016/VOL.1/21 Marb Eng. & Multy Serv. 32,731,295.63 Min. of Water Resources 8 weeks

13 14/3/2017

Constr. of Hand Pumps Water Supply Schemes as Constituency Projects at Sabon Garin Yaya

yamma, Fitatin (Kwalau ward), Gidan Nagi, Gama Kauye and Chukwaikwaiwa in Taura

Constituency. FGPC/92/2016/VOL.1/10 Nushe Business Resources 2,780,800.00 Min. of Water Resources 8 weeks

14 9/3/2017

Constr. of Hand Pumps Water Supply Schemes as Constituency Projects at Turinjiran yamma,

Fadawa Karama, Malumawar Kiri, Shagen Gabas and Majiya in Bulangu Constituency. FGPC/94/2016/VOL.1/10 Bulangu Drill ing Srvices 2,759,500.00 Min. of Water Resources 8 weeks

15 6/3/2017

Constr. of Hand Pumps Water Supply Schemes as Constituency Projects at Dan Gwabro, Gwabso,

Walawa, Malam Lawan Mai Nono and Lallashi Village in Maigatari Constituency. FGPC/14/2017/VOL.1/10 Nadada Ventures Nig. Ltd. 2,755,800.00 Min. of Water Resources 8 weeks

16 6/3/2017

Constr. of Hand Pumps Water Supply Schemes as Constituency Projects at Arewawa, Jaruwa,

Tunfusa Arewa, Riga and GDSS Jahun in Jahun Constituency. FGPC/82/2016/VOL.1/20 Muhal Global Concept 2,748,375.00 Min. of Water Resources 8 weeks

17 7/3/2017

Constr. of Hand Pumps Water Supply Schemes as Constituency Projects at Banbare Gidan Sallau,

Ka'el vil lage, Gumumuwa, Gizo Babba and Kabobi vil lage in Kazaure Constituency. FGPC/73/2016/VOL.1/11 Marb Eng. & Multy Serv. 2,769,900.00 Min. of Water Resources 8 weeks

18 7/3/2017

Constr. of Hand Pumps Water Supply Schemes as Constituency Projects at Digawar Hausawa

Fulani, U/Dawa, Kaka'aiki Zara, Zangon Sallau Gabas and Majiyawar Kanawa in Ringim

Constituency. FGPC/75/2016/VOL.1/20 Marb Eng. & Multy Serv. 2,769,285.00 Min. of Water Resources 8 weeks

19 20/3/2017

Constr. of Second phase Islamiyya Classroom blocks at Fanisau (Karnaya ward) and Gofai

(Limawa ward) in Dutse Constituency FGPC/21/2017/VOL.1/8 Al-kasam Jannah 5,551,958.00 SUBEB 6 weeks

BALANCE C/D 163,108,820.94

Page 32: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD

(N)

BALANCE B/F 163,108,820.94

20 20/3/2017

Constr. of Second phase Islamiyya Classroom blocks at Kukuma Kofar Yamma and Gubabbiya

(Madabe ward) in Buji Constituency FGPC/25/2017/VOL.1/8 Loyalty Properties Ltd. 5,449,021.80 SUBEB 6 weeks

21 20/3/2017

Constr. of Second phase Islamiyya Classroom blocks at Gidan Kanawa (Kanya ward) in Kanya

Babba Constituency in Babura LGA. FGPC/26/2017/VOL.1/8 Detech Nigeria Ltd. 2,649,826.41 SUBEB 6 weeks

22 20/3/2017

Constr. of Second phase Islamiyya Classroom blocks at Agamo (Gamawa Juwai ward) in Auyo

Constituency FGPC/28/2017/VOL.1/8 A.A. Al-jazeera Agro 2,898,894.24 SUBEB 6 weeks

23 20/3/2017

Constr. of Second phase Islamiyya Classroom blocks at Janbulo (Arewa ward) in Kazaure

Constituency FGPC/20/2017/VOL.1/8 Dutse Taura Constr. Co. 2,708,227.41 SUBEB 6 weeks

24 1/3/2017

Constr. Of 2-SPAN Bridge as Change of Scope from 2No. 3-Cells box culverts on Gwaram-Basirka

road. FGPC/17/2017/VOL.1/8 Alren Constr. Co. Ltd. 292,696,945.76 Min. of Works

25 20/3/2017

Constr. of Second phase Islamiyya Classroom block at Madaci town in Kirikasamma

Constituency. FGPC/23/2017/VOL.1/8 Alh. Umar Baban Doki Ltd. 2,801,000.00 SUBEB 6 weeks

26 29/3/2017

Constr. of Hand Pumps Water Supply Schemes (phase II) as Constituency projects at Baushina,

Danya, Garin Daudu and Unguwar Wala Shede in Kafin Hausa Constituency. FGPC/40/2017/VOL.1/16 A &T Global Resources 2,209,620.00 Min. of Water Resources 8 weeks

27 29/3/2017

Constr. of Solar Water Supply Schemes (phase II) as Constituency projects at Ruba (kafin Hausa

ward) in Kafin Hausa Constituency. FGPC/25/2017/VOL.1/16 A &T Global Resources 6,250,650.00 Min. of Water Resources 8 weeks

28 29/3/2017

Constr. of Hand Pumps Water Supply Schemes (phase II) as Constituency projects at Majiyawa

Kunama, Layoyal, Margawa, Barebari, Jankawa, Farau and Daguzau in Ringim Constituency. FGPC/20/2017/VOL.1/16 Marb Eng. & Multi Serv. 3,866,835.00 Min. of Water Resources 8 weeks

29 29/3/2017

Constr. of Hand Pumps Water Supply Schemes (phase II) as Constituency projects at Katoge, Kofar

Alh. Zabgi, Tsamiyar Ilu and Fed. Govt. Girls College (FGC) Kazaure in Kazaure Constituency. FGPC/18/2017/VOL.1/16 Marb Eng. & Multi Serv. 2,209,620.00 Min. of Water Resources 8 weeks

30 29/3/2017

Constr. of Hand Pumps Water Supply Schemes (phase II) as Constituency projects at Bosuwa

Tsangaya, Lallashi Makera, Hardo Jauro, Rugar Musa Ja'o, Fulanin Kankare, Hardo Gambo and

Kaya Jamu in Maigatari Constituency. FGPC/24/2017/VOL.1/16 Muhal Global Concept 3,866,835.00 Min. of Water Resources 8 weeks

31 29/3/2017

Constr. of Solar Powered Water Supply Scheme (phase II) as Constituency projects at Kafi (Kanya

ward) kanya Constituency in Babura LGA. FGPC/28/2017/VOL.1/16 Deetech Nig. Ltd. 6,075,825.00 Min. of Water Resources 8 weeks

32 29/3/2017

Constr. of Solar Powered Water Supply Scheme (phase II) as Constituency projects at Malam

Madori (M/Madori ward) in Malam Madori Constituency. FGPC/21/2017/VOL.1/16 Ramadan Constr. Ltd. 6,250,650.00 Min. of Water Resources 8 weeks

33 29/3/2017

Constr. of Solar Powered Water Supply Scheme (phase II) as Constituency projects at Madachi

(Kiri kasamma ward) in Kirikasamma Constituency. FGPC/26/2017/VOL.1/16 Alh. Umar Baban Doki Ltd. 6,270,000.00 Min. of Water Resources 8 weeks

34 29/3/2017

Constr. of Solar Powered Water Supply Scheme (phase II) as Constituency projects at Sabuwar

Daba (Margadu ward) in Guri Constituency. FGPC/23/2017/VOL.1/16 A.Y.H. Invest. Co. Ltd. 6,144,600.00 Min. of Water Resources 8 weeks

35 29/3/2017

Constr. of Solar Powered Water Supply Scheme (phase II) as Constituency projects at Kore

Sabuwa (Garin Chiroma ward) in Gagarawa Constituency. FGPC/19/2017/VOL.1/16 Loyalty PropertiesLtd. 6,268,290.00 Min. of Water Resources 8 weeks

BALANCE C/D 521,725,661.56

Page 33: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD(N)

BALANCE B/F 521,725,661.56

36 29/3/2017

Constr. of Solar Powered Water Supply Scheme (phase II) as Constituency projects at Wurmawa

(Jahun ward) in Jahun Constituency. FGPC/22/2017/VOL.1/16 Loyalty PropertiesLtd. 6,268,290.00 Min. of Water Resources 8 weeks

37 29/3/2017

Constr. Of Water Collection Points (phase II) as Constituency projects at Gawuna, Makara Huta,

Fantai, Bayan Vocational, Bayan Bitenary, Gagulmari, Kasuwar Kudu, Bakin Kasuwa, Dubantu and

Yankoli in Hadejia Constituency. FGPC/45/2017/VOL.1/16 Zurfat Investment Ltd. 9,874,848.00 Min. of Water Resources 8 weeks

38 29/3/2017

Constr. of Hand Pumps Water Supply Schemes (phase II) as Constituency projects at Fulanin Kafa

Ruwa, Male Fulani, Unguwar Shura, Baggade, Kankare, S/Unguwar Hanyar Gumel, Gangara

Bugaje, Unguwar Tsamiya, Madalla, Takwasa, Jabirawa Fulani, Yantuba and Gangara in Babura

Constituency. FGPC/29/2017/VOL.1/16 Mufabamex Concept Ltd. 7,181,265.00 Min. of Water Resources 8 weeks

39 29/3/2017

Constr. of Hand Pumps Water Supply Schemes (phase II) as Constituency projects at Yosaro,

Dilima/Zaramba and Mungulo in B/Kudu Constituency. FGPC/31/2017/VOL.1/16 A.A. Aljazeera Agro Properties 1,657,215.00 Min. of Water Resources 8 weeks

40 29/3/2017

Constr. of Hand Pumps Water Supply Schemes (phase II) as Constituency projects at Gwaram,

Jikas and Dazara in Gwaram Constituency. FGPC/35/2017/VOL.1/16 A.A. Aljazeera Agro Properties 1,657,215.00 Min. of Water Resources 8 weeks

41 29/3/2017

Constr. of Hand Pumps Water Supply Schemes (phase II) as Constituency projects at Mazawa

Kwanar Karo in Miga Constituency. FGPC/37/2017/VOL.1/16 Loyalty Properties Ltd. 552,405.00 Min. of Water Resources 8 weeks

42 29/3/2017

Constr. of Hand Pumps Water Supply Schemes (phase II) as Constituency projects at Gidan Riga,

Dangolin Kurori, Malamawa Narba, Kofar Malam Fulani and Batsayi in Jahun Constituency. FGPC/34/2017/VOL.1/16 Loyalty Properties Ltd. 2,762,025.00 Min. of Water Resources 8 weeks

43 29/3/2017

Constr. of Hand Pumps Water Supply Schemes (phase II) as Constituency projects at Garin Dutse

in Gagarawa Constituency. FGPC/32/2017/VOL.1/16 Loyalty Properties Ltd. 552,405.00 Min. of Water Resources 8 weeks

44 29/3/2017

Constr. of Hand Pumps Water Supply Schemes (phase II) as Constituency projects at Rigar Hardo

Shuaibu, Rugar Yola, Rugar Gambo Baki, Nasarawa Qtrs. Rugar Gaiye Kujuru, Majanguwa and

Zoriyo in Guri Constituency. FGPC/33/2017/VOL.1/16 A.Y.H. Investment Co. 3,866,835.00 Min. of Water Resources 8 weeks

45 29/3/2017

Constr. of Hand pumps Water Supply Schemes (phase II) as Constituency projects at Takaji, Yayari

Yamma, Tubali and Gorawa in Bulangu Constituency, K/Hausa LGA. FGPC/38/2017/VOL.1/17 Bulangu Drill ing Serv. 2,209,620.00 Min. of Water Resources 8 weeks

46 20/3/2017

Constr. of Second phase Islamiyya Classroom block at Jahun town behind police stationin Jahun

Constituency. FGPC/46/2017/VOL.1/8 Loyalty Properties Ltd. 2,800,000.00 SUBEB 6 weeks

47 29/3/2017

Constr. of Hand pumps Water Supply Schemes (phase II) as Constituency projects at Ung. Gabas,

Rugar Maina Duka, Rugar Adamu Chilaro, Rugar Lamido Gardi and Rugar Hardo Ghamma in

Birniwa Constituency. FGPC/30/2017/VOL.1/16 Hambiscon Nig. Ltd. 2,762,025.00 Min. of Water Resources 8 weeks

48 29/03/2017

Constsruction of Hand pumps Water supply schemes (phase II) as constituency project

at Yola, Masanawa, Larabar Gulai, Katanga Kudu, Dan koli and Dubal in Kiyawa

Constituency. FGPC/39/2017/VOL.I/16 DE-MASTBO 3,331,430.00 Min of Water Resources 8 weeks

49 13/04/2017

Constsruction of Hand pumps Water supply schemes (phase II) as constituency project

at Baushe, Katanga, Tambai and Kadirawan G. Sarki in Kafin Hausa constituency FGPC/40/2017/VOL.I/19 A &T GOLOBAL 2,209,620.00 Min of Water Resources 8 weeks

50 5/4/2017

Constsruction of Hand pumps Water supply schemes (phase II) as constituency project

at Kwandiga, Garin Kanya, Kanya, Maina Binda, Arbu Kofar Liman, Yalleman Hausawa,

Bultuwa and Kuka Kwance in Kaugama constituency FGPC/41/2017/VOL.I/18 A &T GOLOBAL 4,419,240.00 Min of Water Resources 8 weeks

51 29/03/2017

Construction of Solar Powered Water supply schemes (Phase II) as constituency

Projects at Sabuwar Rafa (Andaza ward ) in Dutse constituency FGPC/27/2017/VOL.I/16 DE-MASTBO 6,270,000.00 Min of Water Resources 8 weeks

BALANCE C/D 580,100,099.56

Page 34: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIESCOMP. PERIOD

(N)

BALANCE B/F 580,100,099.56

52 29/03/2017

Construction of Solar Powered Water supply schemes (Phase II) as constituency

Projects at Kantudu (Zango Ward ) in Gumel constituency FGPC/42/2017/VOL.I/16 JAG&H INT SVC 6,250,650.00 Min of Water Resources 8 weeks

53 4/5/2017

Construction of Water collection point Huta, Fantai Bayan Bitenary, Yan koli, IlLALLA,

Chadi, Garko baya GSS Wunti, Bello Bayi and Bayan GSS Aminu Yusuf (Sabuwar Unguwa)

in Hadejia constituency FGPC/45/2017/VOL.I/19 ZURFAT INVT NIG LTD 9,874,848.00 Min of Water Resources 8 weeks

54 16/5/2017 Provision of additional water scheme at Mapower development Institute, Dutse FGPC/63/2017/VOL.I/5 BABAN DOKI GEN ENT 29,244,451.95 Min of Water Resources 12 weeks

55 6/6/2017 Cost Variation/Fluctuation on the improvement of Gumel Town Water supply FGPC/160/2016/VOL.I/9 MARB ENGR SVC LTD 33,651,870.00 Min of Water Resources

56 6/6/2-017 Cost Variation/Fluctuation on the improvement of BaburaTown Water supply FGPC/16/2016/VOL.I/9 PRESTIGE INT. SERVICES 23,180,335.00 Min of Water Resources

57 21/6/2017

Constr. Of 4no. Hand pumps Water supply schemes (phase II) as Constituency projects

at Kofar Gidan Liman, Bayan Gidan Sarkin Bai, Zankuwa fulani and Sabuwar SSS in Garki

Constituency. FGPC/99/2017/VOL.1/5 Taqib Ventures Nig. Ltd. 2,340,000.00 Min of Water Resources 8 weeks

58 21/6/2017

Constr. Of 4no. Hand pumps Water supply schemes (phase II) as Constituency projects

at Kofar Gidan Liman, Bayan Gidan Sarkin Bai, Zankuwa fulani and Sabuwar SSS in Garki

Constituency. FGPC/99/2017/VOL.1/5 Taqib Ventures Nig. Ltd. 2,340,000.00 Min of Water Resources 8 weeks

59 21/6/2017

Constr. Of Solar powered water supply scheme (phase II) as constituency projects at

Karkarna in Yankwashi Constituency. FGPC/97/2017/VOL.1/5 GRANATOIDS ENG SERV. 6,214,000.00 Min of Water Resources 8 weeks

60 21/6/2017

Constr. Of Solar powered water supply scheme (phase II) as constituency projects at

Tattari in Maigatari Constituency. FGPC/98/2017/VOL.1/5 Muhal Global Concept 6,074,000.00 Min of Water Resources 8 weeks

61 4/4/2017

Construction of second Phase Islamiyya Classroom block at Jabo Town in Balangu

constituency Kafin Hausa Local Government Area FGPC/51/2017/VOL.I/10 KAWU NIG LTD 2,805,718.53 SUBEB 6 weeks

62 4/4/2017

Construction of second Phase Islamiyya Classroom block at Dan Gyatin in Miga

constituency FGPC/57/2017/VOL.I/9 AMIA INT NIG LTD 2,746,789.80 SUBEB 6 weeks

63 4/4/2017

Construction of second Phase Islamiyya Classroom block at Madaci Town in

Kirikasamma constituency FGPC/52/2017/VOL.I/10 ALH UMARU BABAN DOKI 2,801,000.00 SUBEB 6 weeks

64 4/4/2017

Construction of second Phase Islamiyya Classroom block at Janbulo (Arewa ward) in

Kazaure constituency FGPC/49/2017/VOL.I/10 DUTSEN TAURA 2,708,227.41 SUBEB 6 weeks

65 20/3/2017

Construction of second Phase Islamiyya Classroom block at Addani (Gurjiya Ward) in

Yankwashi constituency FGPC/47/2017/VOL.I/8 GRANATOIDS ENGR 2,694,252.27 SUBEB 6 weeks

66 4/4/2017

Construction of second Phase Islamiyya Classroom block at Kadeta (medu) ward) in

Gagarawa constituency FGPC/56/2017/VOL.I/10 ESMAIL VEN LTD 2,728,050.34 SUBEB 6 weeks

67 22/05/2017

Construction of Kaugama-Turmi-Baban Tata-Dan zabiya-Gangara-Kuka kwance-Gujungu

Feeder Road (21KM) FGPC/64/2017/VOL.I/8 IGEE ENGR LTD 389,273,999.56 Min of Works 6 Month

BALANCE C/F 1,105,028,292.42

Page 35: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIESCOMP. PERIOD

(N)

BALANCE B/F 1,105,028,292.42

68 30/5/2017

Construction of prototype basic health clinic (BHC) across the state as constituency

project at Garin Chiroma in Gagarawa consitituency. FGPC/92/2017/VOL.1/10 HARUNA LADAN INVEST. 19,285,412.31 Min of Health 16 weeks

69 30/5/2017

Construction of prototype basic health clinic (BHC) across the state as constituency

project at Auyakayi in Auyo consitituency. FGPC/65/2017/VOL.1/10 BABAN DOKI GEN. ENTP. 19,576,947.50 Min of Health 16 weeks

70 30/5/2017

Construction of prototype basic health clinic (BHC) across the state as constituency

project at Gangara in Gumel consitituency. FGPC/71/2017/VOL.1/10 POLYSPEC NIG. LTD. 19,100,000.00 Min of Health 16 weeks

71 30/5/2017

Construction of prototype basic health clinic (BHC) across the state as constituency

project at Maraganta in Gwiwa consitituency. FGPC/72/2017/VOL.1/10 NGALOMA CONSTR. CO. 19,253,751.00 Min of Health 16 weeks

72 30/5/2017

Construction of prototype basic health clinic (BHC) across the state as constituency

project at Gurarraji in Garki consitituency. FGPC/91/2017/VOL.1/10 A.H.I.K. ENTP. LTD. 19,304,132.10 Min of Health 16 weeks

73 30/5/2017

Construction of prototype basic health clinic (BHC) across the state as constituency

project at Ba'auzini in Kazaure consitituency. FGPC/76/2017/VOL.1/10 BABAN DOKI GEN. ENTP. 19,276,132.05 Min of Health 16 weeks

74 30/5/2017

Construction of prototype basic health clinic (BHC) across the state as constituency

project at Fake in Kiyawa consitituency. FGPC/77/2017/VOL.1/10 BABAN DOKI GEN. ENTP. 19,576,947.50 Min of Health 16 weeks

75 30/5/2017

Construction of prototype basic health clinic (BHC) across the state as constituency

project at Dansure in Roni consitituency. FGPC/82/2017/VOL.1/10 DANGATA MEMORIAL 19,335,533.23 Min of Health 16 weeks

76 30/5/2017

Construction of prototype basic health clinic (BHC) across the state as constituency

project at Taka tsaba in Suletankarkar consitituency. FGPC/83/2017/VOL.1/10 POLYSPEC NIG. LTD. 19,675,403.00 Min of Health 16 weeks

77 30/5/2017

Construction of prototype basic health clinic (BHC) across the state as constituency

project at Dankari in Yankwashe consitituency. FGPC/87/2017/VOL.1/10 BABAN DOKI GEN. ENTP. 19,490,741.50 Min of Health 16 weeks

78 30/5/2017

Construction of prototype basic health clinic (BHC) across the state as constituency

project at Baderin gabas in Hadejia consitituency. FGPC/88/2017/VOL.1/10 NGALOMA CONSTR. CO. 19,035,479.45 Min of Health 16 weeks

79 30/5/2017

Construction of prototype basic health clinic (BHC) across the state as constituency

project at Giginya in Babura consitituency. FGPC/89/2017/VOL.1/10 POLYSPEC NIG. LTD. 19,312,904.52 Min of Health 16 weeks

80 30/5/2017

Construction of prototype basic health clinic (BHC) across the state as constituency

project at Sarkin baka in Kanya babba consitituency. FGPC/90/2017/VOL.1/10 BABAN DOKI GEN. ENTP. 19,225,138.00 Min of Health 16 weeks

81 30/5/2017

Construction of prototype basic health clinic (BHC) across the state as constituency

project at Sabon garin yaya in Taura consitituency. FGPC/85/2017/VOL.1/10 A.H.I.K. ENTP. LTD. 19,394,831.50 Min of Health 16 weeks

BALANCE C/F 1,375,871,646.08

Page 36: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIESCOMP. PERIOD

(N)

BALANCE B/F 1,375,871,646.08

82 30/5/2017

Construction of prototype basic health clinic (BHC) across the state as constituency

project at Surko in Birnin kudu consitituency. FGPC/66/2017/VOL.1/10 A.H.I.K. ENTP. LTD. 19,575,646.20 Min of Health 16 weeks

83 30/5/2017

Construction of prototype basic health clinic (BHC) across the state as constituency

project at Ruba in Kafin hausa consitituency. FGPC/79/2017/VOL.1/10 S.U.B. GEN VENTURES 19,523,847.00 Min of Health 16 weeks

84 30/5/2017

Construction of prototype basic health clinic (BHC) across the state as constituency

project at Jarmari in Kirikasamma consitituency. FGPC/78/2017/VOL.1/10 A.A MAIKATAKO 19,723,317.08 Min of Health 16 weeks

85 30/5/2017

Construction of prototype basic health clinic (BHC) across the state as constituency

project at Kantami in Kaugama consitituency. FGPC/75/2017/VOL.1/10 S.U.B. GEN VENTURES 19,523,847.08 Min of Health 16 weeks

86 30/5/2017

Construction of prototype basic health clinic (BHC) across the state as constituency

project at Dawa in Guri consitituency. FGPC/73/2017/VOL.1/10 S.U.B. GEN VENTURES 19,253,751.00 Min of Health 16 weeks

87 30/5/2017

Construction of prototype basic health clinic (BHC) across the state as constituency

project at Zandam ta Gabas in Gwaram consitituency. FGPC/70/2017/VOL.1/10 S.U.B. GEN VENTURES 19,522,270.50 Min of Health 16 weeks

88 30/5/2017

Construction of prototype basic health clinic (BHC) across the state as constituency

project at Dingiya in Fagam consitituency Gwaram Local Government Area FGPC/69/2017/VOL.1/10 A.A. MAIKATAKO GEN ENT 19,723,317.80 Min of Health 16 weeks

89 30/5/2017

Construction of prototype basic health clinic (BHC) across the state as constituency

project at Falgeri in Buji consitituency. FGPC/68/2017/VOL.1/10 S.U.B. GEN VENTURES 19,435,197.06 Min of Health 16 weeks

90 30/5/2017

Construction of prototype basic health clinic (BHC) across the state as constituency

project at Tuminjira in Balangu constituency, Kafin Hausa Local Government Area FGPC/80/2017/VOL.1/10 A.A. MAIKATAKO GEN ENT 19,723,317.80 Min of Health 16 weeks

91 30/5/2017

Construction of prototype basic health clinic (BHC) across the state as constituency

project at Fagi in Birniwa consitituency. FGPC/94/2017/VOL.1/10 S.U.B. GEN VENTURES 19,791,955.70 Min of Health 16 weeks

92 30/5/2017

Construction of prototype basic health clinic (BHC) across the state as constituency

project at Karwai in Ringim consitituency. FGPC/84/2017/VOL.1/10 IMAM AHMAD NIG 19,666,797.24 Min of Health 16 weeks

93 30/5/2017

Construction of prototype basic health clinic (BHC) across the state as constituency

project at Mudiga in Miga consitituency. FGPC/81/2017/VOL.1/10 A.H.I.K. ENTP. LTD. 19,329,482.25 Min of Health 16 weeks

94 30/5/2017

Construction of prototype basic health clinic (BHC) across the state as constituency

project at Dinfiduwa in Malam Madori consitituency. FGPC/86/2017/VOL.1/10 A.G.GLOBAL GOLD 19,693,479.20 Min of Health 16 weeks

95 30/5/2017

Construction of prototype basic health clinic (BHC) across the state as constituency

project at Dan kumbo in Maigatari consitituency. FGPC/93/2017/VOL.1/10 IMAM AHMAD NIG 19,723,317.08 Min of Health 16 weeks

96 30/5/2017

Construction of prototype basic health clinic (BHC) across the state as constituency

project at Hamma yayi in Dutse consitituency. FGPC/67/2017/VOL.1/10 IMAM AHMAD NIG 19,595,410.37 Min of Health 16 weeks

BALANCE C/F 1,669,676,599.44

Page 37: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD

(N)

BALANCE B/F 1,669,676,599.44

97 30/5/2017

Construction of prototype basic health clinic (BHC) across the state as constituency

project at Idanduna in Jahun consitituency. FGPC/74/2017/VOL.1/10 IMAM AHMAD NIG 19,532,487.00 Min of Health 16 weeks

98 20/04/2017

Construction of Juvenile prison, Gate Lodg, Mosque, Classroom and perimeter wall at

Babura (Additional works) FGPC/132/2016/VOL.1/15 NAILA MULTI SERV 3,769,674.07 Min of Justice

99 31/5/2017 Construction of Juma'at Prayer Mosque at Takwardawa in Roni constituency FGPC/5/2017/VOL.1/5 NA'AYI RESOURCES 8,330,898.21 Cabinet Office 12 weeks

100 31/5/2017

Construction of the daily prayer Mosque at Adanbas,kwarin dogaji and wadugur in

Ringim Constituency FGPC/129/2016/VOL.1/6 MARB ENGR & MULT 4,749,281.16 Cabinet Office 8 weeks

101 3/7/2017

Constr. of Line Drain and Culvert (620M) at Dantanoma (Layin Transformer in Gumel

Town. FGPC/100/2017/VOL.I/7 PULLAD GLOBAL LTD 20,891,855.91 Miin of Works 12 weeks

102 5/7/2017 Rehabilitation of Kwanar Dundu-Ausaya-Majawa Bulangu Road (Additional Works) FGPC/136/2016/VOL.I/35 ALREN CONST LTD 1,135,326,386.25 Miin of Works

103 5/7/2017 Constructuction of Hadejia Township roads (Additional works). FGPC/71/2013/VOL.1/35 PAACHE CONSTR. LTD. 177,848,368.32 Miin of Works

104 19/07/2017

General Renovation /Improvement Works at Taura Primary Health Care (cost

fluctuation). FGPC/15/2017/VOL.I/16 BABANDOKI GEN ENT 8,470,328.99 Mn of Health

105 19/07/2017

General Renovation /Improvement Works at Fagam Primary Health Care Gwaram (cost

fluctuation). FGPC/11/2017/VOL.I/17 NGALOMA CONS LTD 6,548,882.59 Min of Health

106 19/07/2017 General Renovation/Improvement Works at Jahun General Hospital (cost fluctuation). FGPC/229/2016/VOL.I/22 YANDUNA VENT LTD 13,278,686.28 Min of Health

107 22/08/2017 General Renovation of Government unity Commercial School Dutse FGPC/176/2017/VOL.I/20 AL-HAMSAD INVST LTD 87,655,390.48 Min of Education 20 weeks

108 28/08/2017

Constr. Of handpumps water supply scheme( Phase I-2017) as Constituency projects at

Danmarke, Bayan Gidan Lauya Jahun, Kabala masallacin Idi Jahun, Gidan Jeji, Dingari

Gidan Makada, Gidan Dango Kofar Yamma and Daradara in Jahun Constituency. FGPC/183/2017/VOL.I/17 LOYALTY PROPERTIES 5,593,350.00 Min of Water Resource 8 weeks

109 28/08/2017

Constr. Of handpumps water supply scheme( Phase I-2017) as Constituency projects at

Karkarna Sabuwa, Yankwashi Fulani, Gurjiya Gari, Wusandu and Zango in

YankwashiConstituency. FGPC/191/2017/VOL.I/17 GRANATOIDS ENG 4,007,325.00 Min of Water Resource 8 weeks

110 23/08/2017

Constr. Of Islamiyya Classroom Blocks as Constituency Project at Aci Lafia and Kudu in

Yankwashi Constituency FGPC/198/2017/VOL.I/17 GRANATOIDS ENG 6,555,993.40 Min of Education 8 weeks

111 23/08/2017

Constr. Of Islamiyya Classroom Blocks as Constituency Project at Kan Tudu Madaka and

Amaryawa in Roni Constituency FGPC/151/2017/VOL.I/10 NA'AYI RESOURCE 9,818,688.60 Min of Education 8 weeks

112 23/08/2017

Constr. Of Islamiyya Classroom Block as Constituency Project at Danya and Doko in

garki Constituency FGPC/146/2017/VOL.I/2017 MMZ GARKI CONST 6,531,598.05 Min of Education 8 weeks

113 22/08/2017

Constr. Of 3No.Classrooms Blocks, Administration Block, 2no 6-Seater VIP Toilet and

Provision of 1No. Hand Pump at Government Day Secondary School Danmasara, Dutse. FGPC/175/2017/VOL.I/20 MUTUAL INFRASTRU 28,008,767.60 Min of Education 8 weeks

BALANCE C/F 3,216,594,561.35

Page 38: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD

(N)

BALANCE B/F 3,216,594,561.35

114 13/09/2017

Extention of Electricity at Bello Bayi, Agumau and Maman Wale Quarters in Hadejia and

Purchase of Thirty Five (35) Number 2.5KVA Gasoline Generators for Distrubution to

Mosques in Hadejia Constituency FGPC/201/2017/VOL.I/17 XTRAXX 99 INTGRATED 54,237,645.52 Min of Works 16 weeeks

115 20/9/2017 Extention of Perimeter wall fencing at (MDI), Dutse (variation works) FGPC/38/2014/VOL.I/30 BABANDOKI GEN ENT 9,553,510.00 Head of Service

116 16/8/2017 Bituminous felt roofing and some renovations of Dutse Central mosque JG/CRS/RA/ADM/12/III Equishare Nig. Ltd. 12,552,135.05 SSG office 6 weeks

117 17/08/2017

Constr. Of Prototype basic Health Clinic (BHC) Across the State as Constituency Project

at Gasakoli in Babura Local Government Area. (change of site) FGPC/90/2017/VOL.I/14 BABANDOKI GEN ENT 19,225,138.00 Min of Health 16 Weeks

118 21/08/2017

Constr. Of Prototype basic Health Clinic (BHC) Across the State as Constituency Project

at Buduru in Garki Local Government Area. (change of site) FGPC/91/2017/VOL.I/14 A.H.I.K ENT LTD 19,304,132.10 Min of Health 16 Weeks

119 18/08/2018

Constr. Of Prototype basic Health Clinic (BHC) Across the State as Constituency Project

at Madobi in Dutse Local Government Area. (change of site) FGPC/67/2017/VOL.I/14 IMAM AHMAD NIG LTD 19,595,410.37 Min of Health 16 Weeks

120 21/08/2018

Constr. Of Prototype basic Health Clinic (BHC) Across the State as Constituency Project

at Arbus in Kaugama Local Government Area. (change of site) FGPC/75/2017/VOL.I/14 S.U.B GEN VENTURE 19,523,847.08 Min of Health 16 Weeks

121 21/08/2018

Constr. Of Prototype basic Health Clinic (BHC) Across the State as Constituency Project

at Rabadi in Fagam, Gwaram Local Government Area. (change of site) FGPC/69/2017/VOL.I/14 A.A MAIKATAKO GEN ENT 19,723,317.80 Min of Health 16 Weeks

122 11/8/2017 Constr. Of New 250 Bed Specialist Hospital in Hadejia FGPC/131/2017/VOL.I/8 PHILKO LIMITED 1,593,314,294.25 Min of Health 16 months

123 6/9/2017 Renovation Works at New School of Nursing Hadejia FGPC/199/2017/VOL.I/6 XTRAX 99 INT SERV LTD 58,681,266.23 Min of Health 12 weeks

124 21/8//2017

Renovation / Improvement works and Water Scheme at Kafin Hausa General Hospital

(Additional Work/Variation) FGPC/99/2016/VOL.I/25 MOJAZ CONST NIG LTD 19,458,546.32 Min of Health

125 7/8/2017

Constr. Of Solar Powered Water Supply Schemes (Phase I) as Constituency Project at

Lafiya and Adiyani in Guri Constituency FGPC/119/2017/VOL.I/12 AYH INVEST COMP LTD 13,843,200.00 Min of Water Resources 8 Weeks

126 7/8/2017

Constr. Of Solar Powered Water Supply Schemes (Phase I) as Constituency Project at

Farure in Gwiwa Constituency FGPC/114/2017/VOL.I/12 THAQIB VENTURE LTD 6,967,800.00 Min of Water Resources 8 Weeks

127 7/8/2017

Constr. Of Solar Powered Water Supply Schemes (Phase I) as Constituency Project at

Kadira in Guri Constituency FGPC/112/2017/VOL.I/12 AYH INVEST COMP LTD 6,921,600.00 Min of Water Resources 8 Weeks

128 7/8/2017

Constr. Of Solar Powered Water Supply Schemes (Phase I) as Constituency Project at

Dunari, Shayya and Majeri in Malam, Madori Constituency FGPC/123/2017/VOL.I/12 LIMIS BROTHERS & CO 20,882,610.00 Min of Water Resources 8 Weeks

BALANCE C/F 5,110,379,014.07

Page 39: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD

(N)

BALANCE B/F 5,110,379,014.07

129 7/8/2017

Constr. Of Solar Powered Water Supply Schemes (Phase I) as Constituency Project at

Dabawa and Damfa in Babura Constituency FGPC/118/2017/VOL.I/12 MUFABAMEX CON LTD 13,921,740.00 Min of Water Resources 8 Weeks

130 7/8/2017

Constr. Of Solar Powered Water Supply Schemes (Phase I) as Constituency Project at

Kurjeni, Kuduje and Rurau in Gwiwa Constituency FGPC/130/2017/VOL.I/12 MANHAF CONS NIG LTD 20,903,400.00 Min of Water Resources 8 Weeks

131 7/8/2017

Constr. Of Solar Powered Water Supply Schemes (Phase I) as Constituency Project at

Unguwar Bako and Gayawa in Garki Constituency FGPC/111/2017/VOL.I/12 ADZ GLOBAL SERV LTD 13,666,020.00 Min of Water Resources 8 Weeks

132 7/8/2017

Constr. Of Solar Powered Water Supply Schemes (Phase I) as Constituency Project at

Marye in Birniwa Constituency FGPC/110/2017/VOL.I/12 ADZ GLOBAL SERV LTD 6,968,010.00 Min of Water Resources 8 Weeks

133 7/8/2017

Constr. Of Solar Powered Water Supply Schemes (Phase I) as Constituency Project at

Afarmo and Tigima in Auyo Constituency FGPC/107/2017/VOL.I/12 ADZ GLOBAL SERV LTD 13,936,020.00 Min of Water Resources 8 Weeks

134 7/8/2017

Constr. Of Solar Powered Water Supply Schemes (Phase I) as Constituency Project at

Baturiya and Tarabu in Kirikasamma Constituency FGPC/108/2017/VOL.I/12 ADZ GLOBAL SERV LTD 13,936,020.00 Min of Water Resources 8 Weeks

135 7/8/2017

Constr. Of Solar Powered Water Supply Schemes (Phase I) as Constituency Project at

Kiyawa Town in kiyawa Constituency FGPC/109/2017/VOL.I/12 ADZ GLOBAL SERV LTD 6,968,010.00 Min of Water Resources 8 Weeks

136 7/8/2017

Constr. Of Solar Powered Water Supply Schemes (Phase I) as Constituency Project at

Kundu in Taura Constituency FGPC/115/2017/VOL.I/12 NUSHE BUSINESS RESOR 6,960,000.00 Min of Water Resources 8 Weeks

137 7/8/2017

Constr. Of Solar Powered Water Supply Schemes (Phase I) as Constituency Project at

Bekarya and Gusau in Gumel Constituency FGPC/113/2017/VOL.I/12 JAG & H INT SERVICES 13,921,740.00 Min of Water Resources 8 Weeks

138 7/8/2017

Constr. Of Solar Powered Water Supply Schemes (Phase I) as Constituency Project at

Kawari in Gwaram Constituency FGPC/122/2017/VOL.I/12 AZZIDS NIG LTD 6,982,500.00 Min of Water Resources 8 Weeks

139 7/8/2017

Constr. Of Solar Powered Water Supply Schemes (Phase I) as Constituency Project at

Nassarawa in Gwaram Constituency FGPC/116/2017/VOL.I/12 AZZIDS NIG LTD 6,982,500.00 Min of Water Resources 8 Weeks

140 7/8/2017

Constr. Of Solar Powered Water Supply Schemes (Phase I) as Constituency Project at

Kigin in Auyo Constituency FGPC/127/2017/VOL.I/12 K MANU GEN CONST 6,968,010.00 Min of Water Resources 8 Weeks

BALANCE C/F 5,242,492,984.07

Page 40: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD

(N)

BALANCE B/F 5,242,492,984.07

141 7/8/2017

Constr. Of Solar Powered Water Supply Schemes (Phase I) as Constituency Project at

Bareye and Jijjigawa in Gagarawa Constituency FGPC/117/2017/VOL.I/12 A.A ALJAZEERA 13,941,260.00 Min of Water Resources 8 Weeks

142 7/8/2017

Constr. Of Solar Powered Water Supply Schemes (Phase I) as Constituency Project at

Kabara, Bagaware and Kandawa Bura in Maigatari Constituency FGPC/125/2017/VOL.I/12 A.U SARO GLOBAL RES 20,882,610.00 Min of Water Resources 8 Weeks

143 7/8/2017

Constr. Of Solar Powered Water Supply Schemes (Phase I) as Constituency Project at

Murdan Kasa, Karkarna Arewa and Sabowa in Yankwashi Constituency FGPC/120/2017/VOL.I/12 GRANTOIDS ENG SERV 20,834,100.00 Min of Water Resources 8 Weeks

144 7/8/2017

Constr. Of Solar Powered Water Supply Schemes (Phase I) as Constituency Project at

Narba in Jahun Constituency FGPC/106/2017/VOL.I/12 LOYALTY PROPERTIES LTD 6,786,150.00 Min of Water Resources 8 Weeks

145 7/8/2017

Constr. Of Solar Powered Water Supply Schemes (Phase I) as Constituency Project at

Nafadawa in Miga Constituency FGPC/105/2017/VOL.I/12 LOYALTY PROPERTIES LTD 6,943,378.50 Min of Water Resources 8 Weeks

146 7/8/2017

Constr. Of Solar Powered Water Supply Schemes (Phase I) as Constituency Project at

Gatare in Birniwa Constituency FGPC/104/2017/VOL.I/12 LOYALTY PROPERTIES LTD 6,889.050.00 Min of Water Resources 8 Weeks

147 7/8/2017

Constr. Of Solar Powered Water Supply Schemes (Phase I) as Constituency Project at

Marma in Kirikasamma Constituency FGPC/103/2017/VOL.I/12 LOYALTY PROPERTIES LTD 6,943,387.00 Min of Water Resources 8 Weeks

148 7/8/2017

Supply of Solar Powered Water Supply pumps (Phase I) as Constituency Project at Jana,

Amaguwa, Gidan Lage, Sankara and Kwandari in Ringim Constituency FGPC/102/2017/VOL.I/12 MARB ENG & MULTI SERV 5,000,047.00 Min of Water Resources 8 Weeks

149 11/8/2017

Constr. Of Solar Powered Water Supply Schemes (Phase I) as Constituency Project at

Kanya Babba, Bata and Fadi at Kanya Babba Constituency in Babura Constituency FGPC/121/2017/VOL.I/13 DEETECH NIG LTD 21,424,662.00 Min of Water Resources 8 Weeks

150 28/8/2017

Constr. Of HandPump Water Supply Scheme (Phase I-2017) as Constituency Project at

Kwarare kauye ( Yola Ward) and Rorau Fulani ( Rorau Ward) in Gwiwa Constituency FGPC/180/2017/VOL.I/17 THAQIB VENT NIG LTD 1,600,200.00 Min of Water Resources 8 Weeks

151 28/8/2017

Constr. Of Hand Pumps Supply Schemes (Phase I-2017) as Constituency Project at Kofar

Gabas Gwaram, Barebari Makabarta Sabuwa, Auyakawa Gidan Dutse Gwaram, Tambo

Gwaram and Sumangara in Gwaram Constituency FGPC/185/2017/VOL.I/17 AZZIDS NIG LTD 7,076,160.00 Min of Water Resources 8 Weeks

BALANCE C/F 5,353,924,938.57

Page 41: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD

(N)

BALANCE B/F 5,353,924,938.57

152 28/8/2017

Constr. Of Hand Pumps Water Supply Schemes (Phase I-2017) as Constituency Project

at Matsaro, Sabon Garu, Dubantu, Gabari, Layin Alh Makeri Sabon Garu, Kantin Waje

Bayan Vocational, Yayari, Atafi, Chadi Anguwar Madaki, Dallah, Bayan NTA, Bello Bayi,

Makara Hutar Duhu, Matsaro Layin Danbaba, Rumfa, Hudu and Charbin Barau in Hadejia

Constituency FGPC/184/2017/VOL.I/17 A. BARDE GLOBAL CON 24,928,000.00 Min of Water Resources 8 Weeks

153 28/8/2017

Constr. Of Handpumps Water Supply Schemes (Phase I-2017) as Constituency Project at

Tsaba, Dabi, Badage Gabas, Tagwani, Jana, Danlare, Alhaji Kayi and Sabuwar Amaguwa

in Ringim Constituency FGPC/181/2017/VOL.I/17 MARB ENG & MULTI SERV 8,001,000.00 Min of Water Resources 8 Weeks

154 28/8/2017

Constr. Of Hand Pumps Water Supply Scheme (Phase I-2017) as Constituency Project at

Gidan Ja'o Hardo Kwalle, Matsatsagi, Baushe Sango, Inwala, Tsinke, Musa Sayya, Hardo

Sani, Dausama, Tarana Sulani and Kiriha in Maigatari Constituency FGPC/182/2017/VOL.I/17 NADADA VENTURES NIG 8,809,762.50 Min of Water Resources 8 Weeks

155 28/8/2017

Constr. Of Hand Pumps Water Supply Scheme (Phase I-2017) as Constituency Project at

Unguwar Aliko (Jigawa Ward) Grave Yard Bayan Asibiti Babura, Unguwar Makeri

Insharuwa and dan Amale Fulani in Babura Constituency FGPC/192/2017/VOL.I/17 MUFABAMEX CONCEPT 3,202,000.00 Min of Water Resources 8 Weeks

156 28/8/2017

Constr. Of Water Collection Points (Phase I-2017) as Constituency Project at Kuloniya,

Yan Kwana-Kwana Mele, Maidabara and Karkasara in Gumel Constituency FGPC/197/2017/VOL.I/17 JAG & H INT SERVICES 6,560,835.00 Min of Water Resources 8 Weeks

157 28/8/2017

Constr. Of Water Collection Points (Phase I-2017) as Constituency Project at Garoro,

Batali and Majiya Bakin Hanya in Taura Constituency FGPC/190/2017/VOL.I/17 NUSHE BUSINESS RES 2,401,717.50 Min of Water Resources 8 Weeks

158 28/8/2017

Constr. Of HandPumps Water Supply Schemes (Phase I-2017) as Constituency Project at

Fulanin Garin Barka Arewa , Fulanin Dan Ama Arewa, Danfarantama, Fulanin Barikin

Faka and Bekarya in Gumel Constituency FGPC/195/2017/VOL.I/17 JAG & H INT SERVICES 4,003,125.00 Min of Water Resources 8 Weeks

159 28/8/2017

Constr. Of HandPumps Water Supply Schemes (Phase I-2017) as Constituency Project at

Kundashe (Muku Ward) Jaya (Garki Ward) and Government girls Secondary School Garki

in Garki Constituency FGPC/194/2017/VOL.I/17 ADZ GLOBAL SERVICES 2,400,300.00 Min of Water Resources 8 Weeks

160 28/8/2017

Constr. Of HandPumps Water Supply Schemes (Phase I-2017) as Constituency Project at

Barka (Andaza Ward), Rigar Amina Ward. Dadin Duniya Andaza , Firera (Andaza Ward),

Yar Auta (Garko Ward), Gidan Rabo ( Fake Ward) Jigawar Kaba (Katanga Ward) Masaya

(Fake Ward) Adakawa ( Andaza Ward) Kanlaha Guduba ( Katuka Ward) Unguwar Madaki

( Katuka Ward) gabashi ( Andaza Ward) Bushe (Andaza Ward) and Gidan Malu in Kiyawa

Constituency FGPC/196/2017/VOL.I/17 ADZ GLOBAL SERVICES 11,201,400.00 Min of Water Resources 8 Weeks

161 31/8/2017

Constr. Of HandPumps Water Supply Schemes (Phase I-2017) as Constituency Project at

Fagoji, Gundun Mazare, Bambam, Gida Dubu, Katujen Gaba and gidan Gamai in Dutse

Constituency FGPC/193/2017/VOL.I/17 TALAKU INT SERV LTD 4,794,300.00 Min of Water Resources 8 Weeks

162 7/9/2017

Constr. Of HandPumps Water Supply Schemes (Phase I-2017) as Constituency Project at

Chiroma, Kupsa Sabuwa Ujiwa, Rigar Mungurum, Tudu Birniwa and Dambin Diginsa in

Birniwa Constituency FGPC/136/2017/VOL.I/15 MUSFAT GEN ENV 4,607,190.00 Min of Water Resources 8 Weeks

BALANCE C/F 5,434,834,568.57

Page 42: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD

(N)

BALANCE B/F 5,434,834,568.57

163 24/08/2017

Constr. Of 17NO. HandPumps Water Supply Schemes (Phase III-2016) as Constituency Project at

Tsakatai Fulani( Budur Ward) Dakace(Doko Ward) Koguran Sabuwa ( Doko Ward), Kofar Gidan

Liman ( Garki Ward) Bayan Gdian Sarkin Bai (Garki Ward), Zankuwa Fulani ( Garki Ward),

Sabuwar Senior Secondary School ( Garki Ward), Zaidawa (Gwarzo Ward), Kurgunguma ( Gwarzo

Ward), Gidan Gone (Siyori Ward) Wailari( Jirima Ward) Ufala Fulani (Rafin Marke Ward) Hardon

Nagona Faggen Gawo( Kore Ward) Gidan Boza (kore Ward) Abudawa (Muku Ward), Unguwar

Shage ( Kanya Ward) and Wailari (Jirima Ward) in Garki Constituency FGPC/178/2017/VOL.I/7 THAQIB VENT NIG LTD 9,945,000.00 Min of Water Resources 8 Weeks

164 28/08/2017

Constr. Of HandPumps Water Supply Schemes (Phase I-2017) as Constituency Proeject at G/

Mutari Ali Hardo Amad Macce, Amanga Gari, Gidan Kwajale, Hardo Chiroma, G/Jafan Sa'idu

Hardo, Yantuba, Unguwar Babangida D/Danra, G/Musa Shanu Hardo, Gidan Wakili Isah Hardo

Matto, Dankwabro Near Madoji, Hardo Dambo Fulanin Babamato, Gidan Hardo Isa Kyarra Gari in

Sule-Tankarkar Constituency FGPC/189/2017/VOL.I/17 MANHAF CONS NIG LTD 9,435,816.00 Min of Water Resources 8 Weeks

165 12/9/2017

Constr. Of HandPumps Water Supply Schemes (Phase I-2017) as Constituency Proeject at Rigar

Buba Madugu, Safaman Ganji, Jangwan Babale, Rigar Mallam Yaya Zugobiya, Rigar Mallam Buba,

Rigar hardo Auduru, Zugobiya, Bodala, Rigar lamido Manu, Rigar lamido Ruwa, Dagana and

Margadu Sabon Fegi in Guri Constituency FGPC/188/2017/VOL.I/19 A.Y.H INVST COMP LTD 9,597,420.00 Min of Water Resources 8 Weeks

166 25/08/2017

Upgarding and Conversion of 7No Motorized Water Supply Schemes to Solar Powered Water

Supply Schemes at Dundubus, Kafin Gana, Danmakama, Marma, Bulangu, Dansure and Jigawa

Town. FGPC/179/2017/VOL.I/6 SIMS GLOBAL RESOURCE 90,265,107.03 Min of Water Resources 16 weeks

167 29/08/20017

Constr. Of HandPumps Water Supply Schemes as Constituency Project at Falkin Jalo Nasarawa,

Fulanin Kuka uku, Fulanin Liman Mado, Fulanin Gangara and Fulanin Dan'ama Gabas in Gumel

Constituency FGPC/80/2016/VOL.I/10 JAG & H INT SERVICES 2,742,600.00 Min of Water Resources 8 Weeks

168 14/9/2017

Constr. Of 2no. Bore-hole and Pipeline route of Water Supply from Matanfada pump station to

(GSS) Roni in Roni. FGPC/124/2017/VOL.I/12 NE Global Eng. 12,400,890.80 Min of Water Resources 8 Weeks

169 7/8/2017

Constr. Of Solar Powered Water Supply Scheme (Phase I) as Constituency Project at Digawa

(Danzomo ward) in Sule T/karkar Constituency. FGPC/202/2017/VOL.I/12 Bulangu Dril l ing Services 6,967,800.00 Min of Water Resources 8 Weeks

170 23/08/2017

Constr. Of Islamiyya Classroom Blocks as Contituency Project at Mariri, Kangire and Nafara in

Birnin Kudu Constituency FGPC/148/2017/VOL.I/10 NUSHE BUSINESS RES 9,819,816.00 SUBEB 6 Weeks

171 7/9/2017

Constr. Of Islamiyya Classroom Blocks 2017 Constituency Project Phase I at Meso and Diginsa in

Birniwa Local Government Area. FGPC/153/2017/VOL.I/10 MUSFAT GEN ENTER 6,536,639.40 SUBEB 5 Weeks

172 23/08/2017

Constr. Of Islamiyya Classroom Blocks as Contituency Project at Malam Bako Gari and Togai in

Sule Tankarkar Constituency FGPC/145/2017/VOL.I/10 MANHAF GLOBAL CONS 6,538,905.86 SUBEB 5 Weeks

173 23/08/2017 Constr. Of Islamiyya Classroom Blocks as Contituency Project at Yamidi in Auyo Constituency FGPC/150/2017/VOL.I/10 A.U.A & SONS NIG LTD 3,280,666.90 SUBEB 4 Weeks

174 23/08/2017

Constr. Of Islamiyya Classroom Blocks as Contituency Project at Gurfai and Babura Tsallake in

Babura Constituency FGPC/147/2017/VOL.I/10 MUFABAMEX CONCEPT LTD 6,490,859.80 SUBEB 5 Weeks

175 23/08/2017

Constr. Of Islamiyya Classroom Blocks 2017 Constituency Project Phase I at Garin Gambo and

Karkasara in Gumel Local Government Area. FGPC/144/2017/VOL.I/10 JAG & H INT SERVICES 6,492,754.80 SUBEB 5 Weeks

BALANCE C/F 5,615,348,845.16

Page 43: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD

(N)

BALANCE B/F 5,615,348,845.16

176 23/08/2017

Constr. Of Islamiyya Classroom Blocks as Contituency Project at Kantudu, Bandutse,

Kabori Gabas, Sha'iskawa and Fatare in Kazaure Constituency FGPC/152/2017/VOL.I/10 DUTSEN TAURA CONST 19,650,342.00 SUBEB 10 Weeks

177 23/08/2017

Constr. Of Islamiyya Classroom Blocks as Contituency Project at Inguwar Tama in Gwiwa

Constituency FGPC/149/2017/VOL.I/10 MANHAF GLOBAL CONS 3,268,467.76 SUBEB 5 Weeks

178 16/08/2017

Constr. Of Islamiyya Classroom Blocks 2017 Constituency Project Phase I at Matarar

Galadima, Gamji and Madugunari in Kiri-Kasamma Local Government Area. FGPC/137/2017/VOL.I/9 ALH. UMAR BABANDOKI 9,774,818.04 SUBEB 7 Weeks

179 16/08/2017

Constr. Of Islamiyya Classroom Blocks 2017 Constituency Project Phase I at Abujan

Amare, Bello Bayi Islamiyya, Garko and Malam Abare Islamiyya in Hadejia Local

Government Area. FGPC/140/2017/VOL.I/9 NA-BAKWAI GEN ENT LTD 13,118,021.60 SUBEB 7 Weeks

180 16/08/2017

Constr. Of Islamiyya Classroom Blocks 2017 Constituency Project Phase I at Sabuwar

Daula, Zango and Alfa in Miga Local Government Area. FGPC/138/2017/VOL.I/9 A.BARDE GLOBAL CON 9,833,550.03 SUBEB 6 Weeks

181 16/08/2017

Constr. Of Islamiyya Classroom Blocks 2017 Constituency Project Phase I at Malarin

Gama and Matsa in Malam Madori Local Government Area. FGPC/142/2017/VOL.I/9 AZZIDS NIG ENT LTD 6,519,858.46 SUBEB 5 Weeks

182 16/08/2017

Constr. Of Islamiyya Classroom Blocks 2017 Constituency Project Phase I at Babebara,

Kazaurawa, Wurya, wurya and Zangon Nagogo in Gwaran Local Government Area. FGPC/143/2017/VOL.I/9 AZZIDS NIG ENT LTD 16,321,387.00 SUBEB 7 weeks

183 17/08/2017

Constr. Of Islamiyya Classroom Blocks 2017 Constituency Project Phase I at kadoma ,

Kularan and Gidan Gamji in Jahun Local Government Area. FGPC/141/2017/VOL.I/9 LOYALTY PROPERTIE LTD 9,797,397.75 SUBEB 6 Weeks

184 16/08/2017

Constr. Of Islamiyya Classroom Blocks 2017 Constituency Project Phase I at Bakin

Jeji,Jutai, Ijje and G/sarkin Aska in Dutse Local Government Area. FGPC/139/2017/VOL.I/9 ALKASAM JANNAH NIG LTD 13,117,868.10 SUBEB 6 Weeks

185 24/08/2017

Constr. of a block 3 classrooms, an Admin Block, Constr. Of 2No. 6-Seater VIP Toilets,

Provision of 1No. Hand Pump and constr. Of a Block of Laboratory at GGDSS Gumel FGPC/163/2017/VOL.I/20 DANGATA MEMORIAL 38,086,803.23 Min of Education 12 Weeks

186 24/08/2017

Constr. of a block 3 classrooms, an Admin Block, Constr. Of 2No. 6-Seater VIP Toilets,

Provision of 1No. Hand Pump and constr. Of a Block of Laboratory at GGDSS Dutse FGPC/162/2017/VOL.I/20 BABANDOKI GEN ENT LTD 37,962,436.27 Min of Education 12 Weeks

BALANCE C/F 5,792,799,795.40

Page 44: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD

(N)

BALANCE B/F 5,792,799,795.40

187 24/08/2017

Constr. of a block 3 classrooms, an Admin Block, Constr. Of 2No. 6-Seater VIP Toilets,

Provision of 1No. Hand Pump. FGPC/159/2017/VOL.I/20 BABANDOKI GEN ENT LTD 29,031,555.81 Min of Education 12 Weeks

188 24/08/2017

Constr. Of a block of 3-Class Rooms, Constr.. Of an Admin, Block, Constr. Of 2No. 6

Seater VIP Toilets and Provision of 1No. Hand Pump at GDSS Shagari Quarters, Hadejia FGPC/156/2017/VOL.I/22 DANGATA MEMORIAL 29,008,767.70 Min of Education 12 Weeks

189 24/08/2017

Constr. Of a block of 3-Class Rooms, Constr.. Of an Admin, Block, Constr. Of 2No. 6

Seater VIP Toilets and Provision of 1No. Hand Pump at GGDSS Babura FGPC/157/2017/VOL.I/12 DANGATA MEMORIAL 31,487,476.82 Min of Education 12 Weeks

190 24/08/2017

Constr. Of a block of 3-Class Rooms, Constr.. Of an Admin, Block, Constr. Of 2No. 6

Seater VIP Toilets and Provision of 1No. Hand Pump at GGDSS Kiyawa FGPC/155/2017/VOL.I/20 NGALOMA CONST LTD 28,851,997.41 Min of Education 2 Weeks

191 24/08/2017

Constr. Of a block of 3-Class Rooms, Constr.. Of an Admin, Block, Constr. Of 2No. 6

Seater VIP Toilets and Provision of 1No. Hand Pump at GGDSS Roni FGPC/158/2017/VOL.I/20 SABON GARIN YAYA 29,141,489.44 Min of Education 12 Weeks

192 24/08/2017

Constr. Of a block of 3-Class Rooms, Constr.. Of an Admin, Block, Constr. Of 2No. 6

Seater VIP Toilets and Provision of 1No. Hand Pump at GGDSS K/Hausa FGPC/160/2017/VOL.I/19 IMAM AHMAD NIG LTD 29,141,489.44 Min of Education 12 Weeks

193 24/08/2017

Constr. Of a block of 3-Class Rooms, Constr.. Of an Admin, Block, Constr. Of 2No. 6

Seater VIP Toilets and Provision of 1No. Hand Pump and Constr. Of a Block of

Laboratory at GGDSS Kazaure FGPC/161/2017/VOL.I/19 IMAM AHMAD NIG LTD 38,086,803.23 Min of Education 12 Weeks

194 24/08/2017

Constr. Of a block of 3-Class Rooms, Constr.. Of an Admin, Block, Constr. Of 2No. 6

Seater VIP Toilets and Provision of 1No. Hand Pump and Constr. Of a Block of

Laboratory at GGDSS Birnin Kudu FGPC/164/2017/VOL.I/8 SABON GARIN YAYA 38,086,803.23 Min of Education 12 Weeks

195 24/08/2017 Constr. Of Ten (10No) Blocks 6-Seater VIP Latrines at G.U.S.C Dutse FGPC/168/2017/VOL.I/16 NGALOMA CONST LTD 23,584,995.60 Min of Education 12 Weeks

196 24/08/2017 Constr. Of Twelve (12No) Hand Pumps to Schools at Various Locations FGPC/154/2017/VOL.I/19 BABANDOKI GEN ENT 9,344,745.00 Min of Education 12 Weeks

197 21/08/2017

Renovation of Science /ICT Laboraties at 8No. Centre of Excellence in the state (GGUSS

Kazaure, GUSS Maigatari, GDSS Babura, GGUSS M/Madori, GDSS Garun Gabas, GDSS

Bulangu, GUSS Basirka and GGUSS Gwaram). FGPC/172/2017/VOL.I/20 MUGIN INVT LTD 41,352,400.79 Min of Education 12 Weeks

198 14/08/2017

Variation for Variation / Additional Workls in Respect of Lott II&III at Sule Lamido

University, Kafin Hausa. FGPC/65/2013/VOL.I/ 27 DATUM CONST NIG LTD 238,484,947.28 Min of Education

199 31/08/2017

Constr. Of Line Drain and Culvert (620M) at Dantanoma (Layin Transformer) in Gumel

Town ( Additional Works). FGPC/100/2017/VOL.I/25 PULLAD CONSULTANT LTD 18,993,645.63 Min of Works 6 weeks

200 8/8/2017 Rehabilitation and Reconnection of Taura-Gujungu-Ajaura and Chuwasu- Chakwakwaiwa ITC LinesFGPC/128/2017/VOL.I/17 AL-MAJEED CONSTR 29,567,211.07 Min of Works 12 Weeks

201 11/9/2017 Electrification of Kwadiya town in Dutse LGA. FGPC/200/2017/VOL.I/6 Al-sabur Global Links 21,304,075.72 Min of Works 6 weeks

BALANCE C/F 6,428,268,199.57

Page 45: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD

(N)

BALANCE B/F 6,428,268,199.57

202 19/10/2017 Constr. of Takur -Jaudi feeder road (4.5km) FGPC/242/2017/VOL.I/8 A.Y.A. Logistics & Constr. Ltd. 78,896,311.20 Min. of Works 12 weeks

203 19/10/2017 Constr. of Limawa-Galamawa second coat surface dressed road (2.2km) FGPC/243/2017/VOL.I/8 A.Y.A. Logistics & Constr. Ltd. 87,185,923.24 Min. of Works 16 weeks

204 24/10/2017 Constr. of Storm Water Drainages at Chamo town in Dutse LGA (3000M) FGPC/246/2017/VOL.I/8 Loyalty Properties Ltd. 91,450,000.00 Min. of Environment 12 weeks

205 24/10/2017 Constr. of Storm Water Drainages at Galamawa town in Dutse LGA (1,600M) FGPC/247/2017/VOL.I/8 Loyalty Properties Ltd. 48,622,000.00 Min. of Environment 12 weeks

206 24/10/2017 Constr. of Storm Water Drainages at Garu town in Dutse LGA FGPC/248/2017/VOL.I/8 A. Amadu Maikatako 26,132,000.00 Min. of Environment 12 weeks

207 24/10/2017 Constr. of Storm Water Drainages at Yalleman town in Kaugama LGA FGPC/249/2017/VOL.I/8 A. Amadu Maikatako 56,839,408.01 Min. of Environment 16 weeks

208 16/10/2017

Constr. of five (5) Daily prayer Mosques at Makangawa, Tafarnuwa, Sugungun and

Unguwar Duhuwa in Garki Constituency. FGPC/226/2017/VOL.I/6 MMZ Garki Gen. Entp. 8,243,957.40 Cabinet office 12 weeks

209 16/10/2017

Constr. of five (5) Daily prayer Mosques at Kasarwa and Jangiwa in Birniwa

Constituency. FGPC/233/2017/VOL.I/6 Musfat Gen. Investment 4,116,102.90 Cabinet office 6 weeks

210 16/10/2017

Constr. of five (5) Daily prayer Mosques at Gidan Mutari, Fulanin Harbo, Danmodi Gari

and Hammado in Sule Tankarkar Constituency. FGPC/237/2017/VOL.I/6 Munhab Global Ventures 6,543,114.75 Cabinet office 6 weeks

211 16/10/2017

Constr. of five (5) Daily prayer Mosques at Gawon Dogari, Garko Chediya and Makarar

Duhu in Hadejia Constituency. FGPC/232/2017/VOL.I/6 Alh. Umaru Babandoki 6,180,378.75 Cabinet office 8 Weeks

212 25/10/2017

Constr. of five (5) Daily prayer Mosques at Gada Rumawa, Sabaru Fanda and Gada Gabas

in Kazaure Constituency. (A) FGPC/207/2017/VOL.I/6 Yanduna Ventures 6,178,879.36 Cabinet office 8 Weeks

213 25/10/2017 Constr. of Friday prayer mosque at Gada yamma in Kazaure Constituency. (B) FGPC/207/2017/VOL.I/6 Yanduna Ventures 46,882,392.01 Cabinet office 12 Weeks

214 2/11/2017 General Renov./Improvement works at Roni Primary Health Centre (PHC) FGPC/253/2017/VOL.I/7 Yusmatech Invest. Nig. Ltd. 26,766,366.36 Min. of Health 12 Weeks

215 2/11/2017 General Renov./Improvement works at Kanya Babba Primary Health Centre (PHC) FGPC/252/2017/VOL.I/8 Math Global Invest. Ltd. 27,609,456.17 Min. of Health 12 Weeks

216 2/11/2017 General Renov./Improvement works at Kaugama Primary Health Centre (PHC) FGPC/251/2017/VOL.I/7 S/garin Yaya Nig. Ltd. 35,574,703.10 Min. of Health 12 Weeks

217 2/11/2017 General Renov./Improvement works at Kazaure Primary Health Centre (PHC) FGPC/250/2017/VOL.I/8 Babandoki Gen. Entp. 48,714,143.31 Min. of Health 16 weeks

218 2/11/2017 Supply and Installation of Solar Powered Lightening System at Dutse Gen. Hospital FGPC/254/2017/VOL.I/7 SIMS Global Resources 27,835,303.13 Min. of Health 8 Weeks

219 22/11/2017 Rehab. Of Karnaya to Dundubus ITC Line in Dutse LGA. FGPC/257/2017/VOL.I/7 Yalwa Oil and Gas Ltd. 5,114,056.50 Min. of Works 8 Weeks

220 22/11/2017

Township Distrubution Network and Inter town Connections at Nasarawa and

Extension from Maidubara to Garin Malam in Gumel LGA.(ITC & TDN Electrification) FGPC/259/2017/VOL.I/8 JAG & H Integrated Serv. Ltd. 43,268,605.12 Min. of Works 12 Weeks

221 22/11/2017 Electrification projects at Daraji (1) and Daraji (II) in Gwiwa LGA. FGPC/258/2017/VOL.I/7 Jignaj Global Constr. Ltd. 21,183,723.27 Min. of Works 8 Weeks

222 20/11/2017 Re-constr. of Unity Pentagon Roundabout-Disina Junction road FGPC/256/2017/VOL.I/12 Retercha Co. Ltd. 70,942,298.85 Min. of Works 8 Weeks

223 16/10/2017

Constr. of Five (5) Daily Prayer Mosques at Dawan gawo and Karkarna in Yankwashi

Constituency. FGPC/238/2017/VOL.I/6 Granitoids Eng. Services 6,148,095.00 Cabinet office 6 weeks

224 16/10/2017

Constr. of Five (5) Daily Prayer Mosques at Dawan gawo and Karkarna in Gumel

Constituency. FGPC/225/2017/VOL.I/6 JAG & H Integrated Serv. Ltd. 4,120,393.20 Cabinet office 6 weeks

BALANCE C/F 7,212,815,811.20

Page 46: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD

(N)

BALANCE B/F 7,212,815,811.20

225 9/11/2017

Constr. of Five (5) Daily Prayer Mosques at Dausayi, Sabon Garin Dandi and Suntilmawa

in Kazaure Constituency. (A) FGPC/206/2017/VOL.I/9 MARB Eng. & Multy Serv. 6,192,036.90 Cabinet office 6 weeks

226 9/11/2017

Constr. of FridayPrayer Mosques at Tsabare, Dandi, Tofa and Gidan Sarki (Friday

Mosque) in Kazaure Constituency. (B) FGPC/206/2017/VOL.I/9 MARB Eng. & Multy Serv. 24,779,470.59 Cabinet office 12 weeks

227 16/10/2017 Constr. of Friday Prayer Mosques at Nasarawa in Gumel Constituency. FGPC/220/2017/VOL.I/6 JAG & H Integrated Serv. Ltd. 15,046,340.35 Cabinet office 12 weeks

228 30/11/2017 Constr. Of Official Residence of the Head of Civil Service (HOS) (Additional works) FGPC/40/2016/VOL.I/13 Design Three-Sixty Ltd. 18,705,258.38 Min. of Land

229 30/11/2017

Constr. Of Official Residence of the Secretary to the State Government (SSG)

(Additional works) FGPC/39/2016/VOL.I/13 Sahal-Bin Nig. Ltd. 25,724,108.93 Min. of Land

230 30/11/2017 Constr. Of 6no. Junior Staff Qtrs. At GGASS Danzomo (Variation/Fluctuation) FGPC/194/2016/VOL.I/12 Mojaz Constr. Ltd. 2,324,232.90 Min. of Land

231 30/11/2017 Constr. Of 6no. Junior Staff Qtrs. At GGASS Danzomo (Variation/Fluctuation) FGPC/195/2016/VOL.I/12 Mojaz Constr. Ltd. 2,324,232.90 Min. of Land

232 5/12/2017 Electrification project at Rimi and Makera in Bulangu Constituency of Kafin Hausa LGA FGPC/260/2017/VOL.I/7 Kawu Nig. Ltd. 29,561,795.38 Min. of Works

233 3/12/2017 Constr. Of 1no. Student hostel at GUSS M/madori (variation/fluctuation) FGPC/262/2016/VOL.I/12 Haruna Ladan Invest. 2,189,567.11 Min of Education

234 3/12/2017 Constr. Of 1no. Student hostel at GUSS M/madori (variation/fluctuation) FGPC/158/2016/VOL.I/12 Haruna Ladan Invest. 2,189,567.11 Min of Education

235 3/12/2017 Constr. Of 1no. Student hostel at GUSS M/madori (variation/fluctuation) FGPC/156/2016/VOL.I/12 Haruna Ladan Invest. 2,189,567.11 Min of Education

236 3/12/2017 Constr. Of 1no. Student hostel at GUSS M/madori (variation/fluctuation) FGPC/159/2016/VOL.I/12 Haruna Ladan Invest. 2,189,567.11 Min of Education

237 5/12/2017

Constr. Of Islamiyya classroom blocks as Constituency project at U/marayu, Fulanin

Kangire and Wurno in Birnin Kudu constituency. FGPC/148/2017/VOL.I/15 Nushe Resources 9,819,816.00 Min of Education 8 weeks

238 24/11/2017 Renov/rehab of Maigatari Export Processing Zone (EPZ) MOC/S/ADM/42/VOL.1/XXX Alpha Zeta Tech. Services 21,482,985.00 Min of Commerce 3 weeks

239 6/12/2017

Drilling and Installation of Water Borehole at Emir of Ringim's Official Residence in

Dutse JG/CRS/RA/ADM/13/III Sir Walter Drilling 850,000.00 Cabinet office 2 weeks

240 27/12/2017

Construction of Block of 3-Classrooms, Adminisrative Block, 2No. Of 6-seater pit

latrines and 1No. Hand Pump at Government Day Secondry School Jahun (lot-8) for

2017 1St and 2nd Quarter Capital projects (Phase II) across the State. FGPC/309/2017/VOL.I/8 Modang Invest Ltd 29,102,893.90 Min of Education 12 weeks

241 27/12/2017

Construction of Block of 3-Classrooms, Adminisrative Block, Laboratoty Block, 2No. Of 6-

seater pit latrines and 1No. Hand Pump at Government Day Secondry School Kanti

Kazaure (lot-12) for 2017 1St and 2nd Quarter Capital projects (Phase II) across the FGPC/311/2017/VOL.I/8 A A Maikatako Gen. 29,158,821.20 Min of Education 12 weeks

BALANCE C/F 7,436,646,072.07

Page 47: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD

(N)

BALANCE B/F 7,436,646,072.07

242 27/12/2017

Construction of Block of 3-Classrooms, Adminisrative Block, Laboratoty Block, 2No. Of 6-

seater pit latrines and 1No. Hand Pump at Government Day Secondry School Galamawa

(lot-11) for 2017 1St and 2nd Quarter Capital projects (Phase II) across the State. FGPC/313/2017/VOL.I/18 A A Maikatako Gen. 29,158,821.11 Min of Education 12 weeks

243 27/12/2017

Construction of Block of 3-Classrooms, Adminisrative Block, Laboratoty Block, 2No. Of 6-

seater pit latrines and 1No. Hand Pump at Government Day Secondry School Dutse (lot-

14) for 2017 1St and 2nd Quarter Capital projects (Phase II) across the State. FGPC/324/2017/VOL.I/8 Sassauci Multi Trade 29,137,148.24 Min of Education 12 weeks

244 27/12/2017

Construction of Block of 3-Classrooms, Adminisrative Block, Laboratoty Block, 2No. Of 6-

seater pit latrines and 1No. Hand Pump at Government Day Secondry School Kadira (lot-

15) for 2017 1St and 2nd Quarter Capital projects (Phase II) across the State. FGPC/325/2017/VOL.I/8 Sassauci Multi Trade 29,137,148.24 Min of Education 12 weeks

245 27/12/2017

Construction of Block of 3-Classrooms, Adminisrative Block, Laboratoty Block, 2No. Of 6-

seater pit latrines and 1No. Hand Pump at Government Day Secondry School Dakido

(lot-16) for 2017 1St and 2nd Quarter Capital projects (Phase II) across the State. FGPC/323/2017/VOL.I/8 Masaka Glo. Con. Ltd 29,140,358.61 Min of Education 12 weeks

246 27/12/2017

Construction of Block of 3-Classrooms, Adminisrative Block, Laboratoty Block, 2No. Of 6-

seater pit latrines and 1No. Hand Pump at Government Day Secondry School Dansure

(lot-13) for 2017 1St and 2nd Quarter Capital projects (Phase II) across the State. FGPC/326/2017/VOL.I/8 Sassauci Multi Trade 29,137,148.24 Min of Education 12 weeks

247 27/12/2017

Construction of Block of 3-Classrooms, Adminisrative Block, Laboratoty Block, 2No. Of 6-

seater pit latrines and 1No. Hand Pump at Government Day Secondry School Gada (lot-

19) for 2017 1St and 2nd Quarter Capital projects (Phase II) across the State. FGPC/305/2017/VOL.I/8 Sabon Gari 'Ya'ya Nig 37,964,046.26 Min of Education 12 weeks

248 27/12/2017

Construction of Block of 3-Classrooms, Adminisrative Block, Laboratoty Block, 2No. Of 6-

seater pit latrines and 1No. Hand Pump at Government Day Secondry School Ringim

(lot-21) for 2017 1St and 2nd Quarter Capital projects (Phase II) across the State. FGPC/307/2017/VOL.I/8 Sabon Gari 'Ya'ya Nig 37,964,046.26 Min of Education 12 weeks

249 27/12/2017

Construction of Block of 3-Classrooms, Adminisrative Block, Laboratoty Block,2No. Of 6-

seater pit latrines and 1No. Hand Pump at Government Day Secondry School Dundubus

(lot-18) for 2017 1St and 2nd Quarter Capital projects (Phase II) across the State. FGPC/306/2017/VOL.1/8 Imam Ahmad Nig. Ltd. 37,923,773.12 Min of Education 12 weeks

250 27/12/2017

Construction of Block of 3-Classrooms, Adminisrative Block, Laboratoty Block, 2No. Of 6-

seater pit latrines and 1No. Hand Pump at Government Day Secondry School Hadejia

(lot-20) for 2017 1St and 2nd Quarter Capital projects (Phase II) across the State. FGPC/308/2017/VOL.1/8 Imam Ahmad Nig. Ltd. 37,923,773.12 Min of Education 12 weeks

BALANCE C/F 7,734,132,335.27

Page 48: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD

(N)

BALANCE B/F 7,734,132,335.27

251 27/12/2017

Construction of Block of 3-Classrooms, Adminisrative Block, Laboratoty Block, 2No. Of 6-

seater pit latrines and 1No. Hand Pump at Government Day Secondry School Sabuwar

Gwaram (lot-10) for 2017 1St and 2nd Quarter Capital projects (Phase II) across the

State. FGPC/312/2017/VOL.1/8 A A Maikatako Gen. 29,158,821.11 Min of Education 12 weeks

252 21/12/2017 Construction of Wall Fence, Gate and House at Specialist Hospital Kazaure FGPC/298/2017/VOL.1/6 Ngaloma Constr Com 57,329,839.50 Min of Health 8 Weeks

253 18/12/2017

Rehabilitation of Solar Powered Water supply schemes across the State at Birnin kudu,

Dutse, Hadejia,Ringim, Gumel, Jahun and Kazaure zone (Stowa) FGPC/263/2017/VOL.1/7 Sims Global Resources 166,689,700.28 Min of Water 12 weeks

254 28/12/2017

Construction of complete Solar Powered Water supply scheme in Yan Maulu Town in

Babura Local Govt Area and conversion of Daba Town Water supply scheme in Kazaure

Local Govt Area. FGPC/332/2017/VOL.1/6 Umar Aliyu & Sons Ltd. 14,255,587.50 Min of Water Resources 8 Weeks

255 28/12/2017 Improvement of Taura Water supply scheme in Taura local Govt Area FGPC/333/2017/VOL.1/6 Ngaloma Constr Com 51,176,269.46 Min of Water Resources 12 weeks

256 18/12/2017

Construction of One (1No.) Students Hostel on Existing foundation at the Institute of

Information Technology, Kazaure. FGPC/264/2017/VOL.1/8 Nushe Biz. Resources 49,831,834.74 Min of Education 12 weeks

257 22/12/2017

Construction of Reinforced Concrete Block line Drains and Culvert at Aujara Bakin

Kasuwa and Tsigi (1650m). FGPC/302/2017/VOL.1/8 Alren Constr. Co. Ltd. 63,238,372.91 Min of Works 4 Weeks

258 22/12/2017 Rehabilitation and upgrading of Aujara access road (1.65KM). FGPC/301/2017/VOL.1/8 Retercha Co. Ltd. 96,860,399.34 Min of Works 6 weeks

259 6/12/2017 Drilling and installation of Water Borehole at Emir of Ringim Official residence in Dutse JG/CRS/RA/ADM/13/III Sir Walter Drilling & Gen 850,000.00 Cabinet Office 2 weeks

260 14/08/2017

Construction of Solar Powered Water Supply Schemes (PhaseI) as Constituency project

at Gargadin Giwa and Rumbiya in Burnin kudu Constituency. FGPC/126/2017/VOL.1/15 Y-Tech Invst. & Agro Nig Ltd 13,921,740.00 Min of Water 8 Weeks

261 18/12/2017

Construction of Five (5) daily Prayer Mosques at Wutsadaand Kankare Fulani in Gwaram

Constituency. FGPC/330/2017/VOL.1/7 Al-Nasibi Gen. Intp. 4,129,061.98 Cabinet Office 4 Weeks

262 18/12/2017

Construction of Five (5) daily Prayer Mosques at Namako (Sabon Gari Ward) inMiga

Constituency. FGPC/334/2017/VOL.1/7 Khairussabah Nig. Ltd 2,064,530.99 Cabinet Office 4 Weeks

263 18/12/2017

Construction of Five (5) daily Prayer Mosques at Garin Baki, Dan Farantama, Zuge and

Tudun D/Bulim in Gumel Constituency. FGPC/321/2017/VOL.1/7 Jag & H Intgrt. Serv. Ltd. 8,258,123.96 Cabinet Office 8 Weeks

BALANCE C/F 8,291,896,617.04

Page 49: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD

(N)

BALANCE B/F 8,291,896,617.04

264 18/12/2017

Construction of Five (5) daily Prayer Mosques at Dingari Walgare and Batukokori (Batu

Ward) in Birniwa Constituency. FGPC/285/2017/VOL.1/7 Amm Manzo Nig. Ltd. 4,129,061.98 Cabinet Office 6 Weeks

265 18/12/2017

Construction of Five (5) daily Prayer Mosques at Karshi and Aimas Kuka in Auyo

Constituency. FGPC/286/2017/VOL.1/7 Amm Manzo Nig. Ltd. 4,129,061.98 Cabinet Office 6 Weeks

266 18/12/2017

Construction of Five (5) daily Prayer Mosques at Kukuma Kudu (Kumuma Ward), Dakori

(Gantsa Ward) and Falgeri Arewa (Falgeri Ward) in Buji Constituency. FGPC/277/2017/VOL.1/7 K-Manu Gen. Cnstrc. & Engr 6,193,592.97 Cabinet Office 8 Weeks

267 18/12/2017

Construction of Five (5) daily Prayer Mosques at S/G Shinakani, Galadimawa and

Bulangori in Buji Constituency. FGPC/279/2017/VOL.1/7 A+Tech Intgrt. Service 6,193,592.97 Cabinet Office 6 Weeks

268 18/12/2017

Construction of Five (5) daily Prayer Mosques at Kiramisau, Tage (Fandu Ward) and

Maikintari (Kirikasamma Ward) in Kirikasamma Constituency. FGPC/282/2017/VOL.1/7 Alh Umar Baban Doki Nig Ltd 6,193,592.97 Cabinet Office 6 Weeks

269 18/12/2017

Construction of Five (5) daily Prayer Mosques at Garbagar Gari (Garbagai Ward), Wareri

(Guri Ward), Zoriyo (Adiyani Ward), Jauron Kadira (Kadira Ward) and Dolewa (Kadira

Ward) in Guri Constituency. FGPC/281/2017/VOL.1/7 Alh Umar Baban Doki Nig Ltd 10,322,654.95 Cabinet Office 8 Weeks

270 18/12/2017

Construction of Five (5) daily Prayer Mosques at Asayaya Gari (Sule Ward), Garin Tamba

(Taka Tsaba Ward) Muku Gari and renovation of 1No. Mosque at Sule Kudu Primary

School (Sule Ward) in Sule Tankarkar Constituency. FGPC/280/2017/VOL.1/7 Khairubaba Nig. Ltd. 8,258,123.96 Cabinet Office 8 Weeks

271 18/12/2017

Construction of Five (5) daily Prayer Mosques at Gidan Nagari, Damaganawa Yamma,

Kadirawa Aduchawa, Zage dantse, Kaka lafiya, Zareku, Koya, Burji Abuja, Gwari and

Zugawa in Miga Constituency. FGPC/271/2017/VOL.1/7 Amia Intgr Serv. Nig. Ltd. 20,645,309.99 Cabinet Office 12 Weeks

272 18/12/2017

Construction of Five (5) daily Prayer Mosques at Makwarawa(Tofa Ward) and Dabi (Dabi

ward) in Ringim Constituency. FGPC/265/2017/VOL.1/7 Prestige Intgrt. Serv. 4,129,061.98 Cabinet Office 6 Weeks

273 18/12/2017

Construction of Five (5) daily Prayer Mosques at mazazzaga (Garko Ward) and Balago

Town Balago Ward) in Kiyawa Constituency. FGPC/284/2017/VOL.1/7 Demastbo Ventures Ltd. 4,129,061.98 Cabinet Office 6 Weeks

274 18/12/2017

Construction of Five (5) daily Prayer Mosques at Kandila Wuriya (Machinamari Ward),

Balamalum (Machinamari Ward) and matamu (Matamu Ward) in Birniwa Constituency. FGPC/328/2017/VOL.1/7 Masaka Global Concept Ltd 6,193,592.97 Cabinet Office 6 Weeks

275 18/12/2017

Construction of Five (5) daily Prayer Mosques at Jemawa, Sansami, Muna fadi and

Construction of Juma'at Prayer Mosque at Kanya Town in Kanya Babba Constituency of

Babura Local Govt Area. FGPC/304/2017/VOL.1/7 Deetech Nig. Ltd. 16,304,386.14 Cabinet Office 12 Weeks

BALANCE C/F 8,388,717,711.88

Page 50: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD

(N)

BALANCE B/F 8,388,717,711.88

276 18/12/2017

Construction of Five (5) daily Prayer Mosques at Mirgina, Danbuwayi, Zuge,

UnguwarKiwo, Dan Goriba and Construction of Juma'at Prayer Mosque at Danbanki in

Sule Tankarkar Constituency. FGPC/300/2017/VOL.1/7 Bulangu Drilling Services 22,536,624.84 Cabinet Office 12 Weeks

277 18/12/2017

Construction of Five (5) daily Prayer Mosques at Kajimaran (Dawa Ward), Garin Malam

(Abunabo Ward), Zango Tsangaya (Matara Babba Ward), Guri Nayinawa (Guri Ward) and

Guri Town Yallari (Guri Ward) in Guri Constituency. FGPC/299/2017/VOL.1/7 Jiffa Enterprises 10,322,654.95 Cabinet Office 8 Weeks

278 18/12/2017

Construction of Five (5) daily Prayer Mosques at J/Habuja, Gorum Wangara, Barde rabe

(Madobi Ward), Maya-maya (Kudai Ward), Katangar Lafiya (Madobi Ward) and Sharifai

(Madobi Ward) in Dutse Constituency. FGPC/275/2017/VOL.1/7 Al-Kasam Jannah Nig. Ltd. 14,451,716.93 Cabinet Office 8 Weeks

279 18/12/2017

Construction of Five (5) daily Prayer Mosques at Kabala, Sabuawr Gada, Gabori and

Majira in jahun Constituency. FGPC/269/2017/VOL.1/7 Yanduna Ventures Ltd. 8,258,123.96 Cabinet Office 8 Weeks

280 18/12/2017

Construction of Five (5) daily Prayer Mosques at Shaiskawa, Gabas, Badado, Mai tsani,

Gezoji, Durgutawa, Dunguliya and Gurunfa in Kazure Constituency. FGPC/268/2017/VOL.1/7 Yanduna Ventures Ltd. 14,451,716.93 Cabinet Office 12 Weeks

281 18/12/2017

Construction of Five (5) daily Prayer Mosques at Kandi (Bata Ward), Unguwar Magaji

(BataWard) and completion/renovation of Juma'at Prayer Mosques at Babura Central

Mosque, Jigawar Dan Ali central and Babura Jibwis in Babura Constituency. FGPC/288/2017/VOL.1/7 Mufabamex Concept Ltd. 21,631,959.79 Cabinet Office 12 Weeks

282 18/12/2017

Construction of Five (5) daily Prayer Mosques at Dazara Waje, Lewa, Sara kudu,

Unguwar Gwanji, Gwanjira and Yadda in Gwaram Constituency. FGPC/273/2017/VOL.1/7 Nushe Business Resources 12,387,185.94 Cabinet Office 8 Weeks

283 18/12/2017

Construction of Five (5) daily Prayer Mosques at Sabuawar Kaura, Kiyako, Birnin kudu,

Samamiya and Bigidan in Birnin Kudu Constituency. FGPC/272/2017/VOL.1/7 Nushe Business Resources 10,322,654.95 Cabinet Office 8 Weeks

284 18/12/2017

Construction of Three (3) daily Prayer Mosques at Yakasai, Unik Babba and Kalgwai in

auyo Constituency. FGPC/274/2017/VOL.1/7 Xtra 99 Intgrt Services Ltd. 6,193,592.97 Cabinet Office 6 weeks

285 18/12/2017 Construction of Juma'at Prayer Mosques at Garin Mado in Gagarawa Constituency. FGPC/297/2017/VOL.1/7 Modang Investment Ltd. 9,527,340.25 Cabinet Office 12 Weeks

286 18/12/2017 Construction of Juma'at Prayer Mosques at Gidan Dallaand Kaban in Auyo Constituency. FGPC/319/2017/VOL.1/7 A.A Aljazeera Agro Processing 19,880,299.20 Cabinet Office 12 Weeks

287 18/12/2017 Construction of Juma'at Prayer Mosques at Tattari in Maigatari Constituency. FGPC/267/2017/VOL.1/7 Marb Engr. & Multi Services 8,152,066.79 Cabinet Office 12 Weeks

288 18/12/2017 Construction of Juma'at Prayer Mosques at Turbus in Maigatari Constituency. FGPC/278/2017/VOL.1/7 Alkawakeb Global Concept 13,748,890.28 Cabinet Office 12 Weeks

289 18/12/2017

Construction of Juma'at Prayer Mosques at Tsadawa, Abakura and Tsinaho in Taura

Constituency. FGPC/276/2017/VOL.1/7 Dan Kwara Maijimina NigLtd 10,258,059.52 Cabinet Office 12 Weeks

BALANCE C/F 8,570,840,599.18

Page 51: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD

(N)

BALANCE B/F 8,570,840,599.18

290 18/12/2017

Construction of Juma'at Prayer Mosques at Dagaceri (Batu Ward) in Birniwa

Constituency. FGPC/290/2017/VOL.1/7 Amm Manzo Nig. Ltd. 14,403,675.29 Cabinet Office 12 Weeks

291 18/12/2017 Construction of Juma'at Prayer Mosques at Tattari Maigatari Constituency. FGPC/320/2017/VOL.1/7 A.A. Maikatako Gen. Entp 8,152,066.79 Cabinet Office 12 Weeks

292 18/12/2017

Construction of Juma'at Prayer Mosques at Karkarna and completion/renovation of

Juma'at prayer Mosque at Yankwashi Central Mosque in Yankwashi Constituency. FGPC/294/2017/VOL.1/7 Granatoids Engr. Services 29,994,641.37 Cabinet Office 12 Weeks

293 18/12/2017

Completion/renovation of Juma'at Prayer Mosques at Jibwis Garki in Garki

Constituency. FGPC/322/2017/VOL.1/7 Jag & H Intgrt Services Ltd 23,736,083.26 Cabinet Office 12 Weeks

294 18/12/2017

Completion/renovation of Juma'at Prayer Mosques at Shabaru in Suletankarkar

Constituency. FGPC/327/2017/VOL.1/7 A.A. Maikatako Gen. Entp 3,091,180.72 Cabinet Office 12 Weeks

295 18/12/2017

Completion/renovation of Juma'at Prayer Mosques at Gabarin, Tsungur, Shafar

Daurawa, Sankara, Karshi and K/Babushe in Ringim Constituency. FGPC/266/2017/VOL.1/7 Marb Engr. & Multi Services 25,604,269.74 Cabinet Office 12 Weeks

296 18/12/2017

Completion/renovation of Juma'at Prayer Mosques at Yarkurshe, Dan Barge, Ganga,

Kwanar Garki, GGSS Garki, Kaya, Kargo, Kafadodo and Batakashi in Garki Constituency. FGPC/291/2017/VOL.1/7 MMZ Garki Consrt Ltd 18,344,212.97 Cabinet Office 12 Weeks

297 18/12/2017

Completion/renovation of Juma'at Prayer Mosques at Izala Basirka, Kawari, Matsango

and Construction of Juma'at Prayer Mosques at Basirka Central and Wall Fencing at

Digijin Juma'at Mosque in Fagam Constituency in Gwaram L. G. A. FGPC/289/2017/VOL.1/7 G. M. Sara & Sons Ltd 44,858,345.27 Cabinet Office 14 Weeks

298 18/12/2017

Completion/renovation of Juma'at Prayer Mosques at Dansure and Roni kudu and

Construction of Juma'at Prayer Mosques at Kaya and Wall Fencing at Takwardawa in

Roni Constituency. FGPC/270/2017/VOL.1/7 Na'ayi Recources Ltd. 33,832,397.35 Cabinet Office 12 Weeks

299 18/12/2017

Construcction of Wall fencing of Juma'at Prayer Mosque at Gidar Sarki in Kafin Hausa

Constituency. FGPC/287/2017/VOL.1/7 AMM Manzo Nig. Ltd. 2,048,758.99 Cabinet Office 6 Weeks

300 18/12/2017

Renov of five (5) Daily prayer mosque at Arki town (Arki ward) in M/madori

Constituency FGPC/335/2017/VOL.1/7 Ramadan Constr Co. 2,064,530.99 Cabinet Office 6 Weeks

301 28/12/2017 Improvement of Jahun town water supply scheme in Jahun LGA FGPC/338/2017/VOL.1/6 Babandoki Gen Entp. 19,822,950.00 Min of Water Resources 12 Weeks

302 28/12/2017 Improvement of Kiyawa town water supply scheme in Kiyawa LGA FGPC/337/2017/VOL.1/6 Babandoki Gen Entp. 38,571,055.11 Min of Water Resources 12 Weeks

303 18/12/2017

Completion/renovation of Juma'at Prayer Mosques at Sarawa, Fadawa and Adin in

Kafin Hausa Constituency in Gwaram L. G. A. FGPC/283/2017/VOL.1/7 Demastbo Ventures Ltd. 9,338,782.31 Cabinet Office 12 Weeks

304 27/12/2017

Construction of Block of 3-Classrooms, Adminisrative Block, Laboratoty Block, 2No. Of 6-

seater pit latrines and 1No. Hand Pump at Government Day Secondry School Ringim

(lot-9) for 2017 1St and 2nd Quarter Capital projects (Phase II) across the State. FGPC/317/2017/VOL.1/8 Alhansad Invest. Ltd. 29,086,685.06 Min of Education 12 weeks

BALANCE C/F 8,873,790,234.40

Page 52: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD

(N)

BALANCE B/F 8,873,790,234.40

305 27/12/2017

Construction of Block of 3-Classrooms, Adminisrative Block, Laboratoty Block, 2No. Of 6-

seater pit latrines and 1No. Hand Pump at Government Day Secondry School Gada (lot- FGPC/318/2017/VOL.1/8 Alhansad Invest. Ltd. 38,092,674.78 Min of Education 12 weeks

306 20/11/2017 Constr of Drainages at Achauya village, S/Tankarkar Constituency. ME/ADM/S/115/1/8 Sukudai Constr. Nig. Ltd. 12,017,528.27 Min of Environment 12 weeks

307 18/12/2017

Construction of Five (5) Daily Prayer Mosques at Gilima, Gidan Naruwa, Kundu-Gidan

Liman, Kukuy (Chukuto ward), Zangon Maje, Kaya-Gazara (Chukuto ward) and Dogon

Marke (Kwalam ward) in Taura Constituency. FGPC/336/2017/VOL.1/8 A.Y. Dan baba Nig. Ltd. 14,451,716.93 Cabinet Office 8 Weeks

308 18/12/2017

Construction of Five (5) Daily Prayer Mosques at Kofar Fada Mafudi in fagam

Constituency. FGPC/339/2017/VOL.1/7 G.M. Sara & Sons Ltd. 2,064,530.99 Cabinet Office 4 Weeks

309 16/10/2017

Construction of Five (5) Daily Prayer Mosques at Tsigi, Yar Kasuwa and Gidan Ganji in

Jahun Constituency. FGPC/227/2017/VOL.1/6 A.A. Aljazeera Agro 6,686,394.75 Cabinet Office 12 Weeks

310 18/12/2017

Construction of Five (5) Daily Prayer Mosques at Garbagal Gari (Garbagal ward), Wareri

(Guri Ward), Zoriyo (Adiyani ward), Jauron Kadira (Kadira ward) and Dolewa (Kadira

ward) in Guri Constituency. FGPC/281/2017/VOL.1/7 Alh. Umaru Baban Doki 10,322,654.95 Cabinet Office 8 Weeks

311 18/12/2017 Construction of Five (5) Daily Prayer Mosques atGuntai Gari in Gwiwa Constituency. FGPC/340/2017/VOL.1/7 Daragi and Sons 2,064,530.99 Cabinet Office 4 Weeks

GOODS

312 3/3/2017 Purchase of Grains (Maize) (1000 mts) CONC/4/2017 Juraj Gen. Entp. 145,480,000.00 Min. of Women Affairs 4 weeks

313 6/3/2017

Supply and Installation of Stand-Alone Solar Streetlight Poles with Accessories (100 units) at

Kanya Babba in Babura LGA. (change of scope) FGPC/146/2016/VOL.1/9 SIMS Global Resoures 63,283,500.00 Min. of Works 12 weeks

314 6/3/2017

Supply and Installation of Stand-Alone Solar Streetlight Poles with Accessories (100 units) along

Old Police H/qtrs. To Garu road at Dutse LGA. (change of scope) FGPC/145/2016/VOL.1/9 SIMS Global Resoures 63,283,500.00 Min. of Works 12 weeks

315 4/1/2017 Procurement and Fixing of Furniture to Deputy Governor's Residential complex, Dutse FGPC/202/2016/VOL.1/6 Connaught Internation Serv. 74,442,690.00 DCDA 4 weeks

316 7/2/2017 Supply of Furniture to New School of Nursing, Hadejia FGPC/16/2016/VOL.1/12 Wajabs Building & Constr. 47,076,618.00 Min. of Health 12 weeks

317 19/4/2017

Procurement and Apply of Termites and Bats Control Chemicals for 87no. Schools

across the State FGPC/60/2017/VOL.1/8 Ngloma Constr. Co. 12,789,000.00 Min. of Education 8 weeks

BALANCE C/F 9,365,845,574.06

Page 53: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD

(N)

BALANCE B/F 9,365,845,574.06

318 31/5/2017 Approval for the purchase of Grains (Maize) (650 MTS) CONC/14/2017 Juraj Gen. Entp. 99,162,000.00 Min. of Women Affairs 4 weeks

319 21/6/2017

Supply and Installation of Furniture and Electronics for the New Guest's Facilities at

MDI Dutse FGPC/95/2017/VOL.1/5 BABAN DOKI GEN. ENTP. 246,220,380.00 HOS Office 12 weeks

320 20/04/2017 Purchase of 2,000 Sets of Classroom Furniture FGPC/61/2017/VOL.I/7 FURNI-ELECT GLOBAL 30,000,000.00 Min of Education 12 weeks

321 20/04/2017 Purchase of 4,000 Sets of Classroom Furniture FGPC/62/2017/VOL.I/7 ABDUL-COM PROJECT 60,000,000.00 Min of Education 12 weeks

322 18/08/2017

Supply of 660 Set of 3Seater Class Room Furniture at GDSS Roni, Supply of 110 3Seater Class

Rooms Furniture at GDSS Gada, Supply of 385 Sets of 3 Seater ClassRooms Furniture at GGDSS

Kazaure and Supply of 330 Sets of 3Seater ClassRoom Furinture at GDSS Kazaure. FGPC/169/2017/VOL.I/16 NAKOWA GEN ENT 29,894,720.05 Min of Education 8 Weeks

323 11/7/2017 Furnishing and Equipping of his Excellency, the Deputy Governor's Lodge, Abuja. FGPC/101/2017/VOL.I/5 CONNAUGHT INT LTD 31,042,200.00 SSG Office 12 weeks

324 19/07/2017

Supply and Installation of Stand Alone Solar Streetlight Poles with Accessories ( 100 Units) Along

Old Police Headquarters Garu Road at Dutse( Additional Works (32 Units). FGPC/145/2016/VOL.I/28 SIMS GLOBAL RESO 19,196,100.00 Miin of Works

325 22/08/2017

Purchase of Classroom Furniture (GGUSS Kazaure, GUSS Maigatari, GDSS Babura, GGUSS M/Madori, GDSS

Garun Gabas, GDSS Bulangu, GUSS Basirka and GGUSS Gwaram). FGPC/174/2017/VOL.I/20 MUTUAL INFRASTRU 64,471,284.66 Min of Education 12 weeks

326 24/08/2017

Supply of 958 Sets of 3 Seater ClassRooms Furniture and Supply of 1056 3 Seaters Class Rooms Furniture at

GSS Fantai and Gss Famfo Goma, Hadejia. FGPC/165/2017/VOL.I/20 FURNI ELECT GLOBAL VEN 39,977,900.00 Min of Education 8 weeks

327 17/08/2017

Procurement and Installation of Ict Equipment at 8No. Centre of excellence (GGUSS Kazaure, GUSS Maigatari,

GDSS Babura, GGUSS M/Madori, GDSS Garun Gabas, GDSS Bulangu, GUSS Basirka and GGUSS Gwaram). FGPC/167/2017/VOL.I/15 NGALOMA CONST LTD 148,885,944.48 Min of Education 8 weeks

328 22/08/2017 Supply of 30,000 Sets of Schools Uniforms to all SS-1 Girls of Senior Secondary Schools Across the State FGPC/177/2017/VOL.I/20 313 TEXTILE NIG LTD 74,655,000.00 Min of Education 8 weeks

329 18/08/2017

Procurement of Assorted Biology Laboratory Equipment at 8No. Centre of Execellence(GGUSS Kazaure, GUSS

Maigatari, GDSS Babura, GGUSS M/Madori, GDSS Garun Gabas, GDSS Bulangu, GUSS Basirka and GGUSS

Gwaram) FGPC/170/2017/VOL.I/15 A.A MAIKATAKO GEN ENT 34,903,627.50 Min of Education 16 weeks

330 18/08/2017

Procurement of Assorted Chemistry Laboratory Equipment at 8No. Centres of Execellence (GGUSS Kazaure,

GUSS Maigatari, GDSS Babura, GGUSS M/Madori, GDSS Garun Gabas, GDSS Bulangu, GUSS Basirka and

GGUSS Gwaram) FGPC/171/2017/VOL.I/17 A.A MAIKATAKO GEN ENT 34,197,019.50 Min of Education 8 Weeks

331 21/08/2017

Procurement of Assoorted Physics Laboratory Equipments at 8No. Centres of Excellence (GGUSS Kazaure,

GUSS Maigatari, GDSS Babura, GGUSS M/Madori, GDSS Garun Gabas, GDSS Bulangu, GUSS Basirka and

GGUSS Gwaram) FGPC/173/2017/VOL.I/20 MUGIN INVT LTD 37,043,435.93 Min of Education 8 Weeks

332 24/08/2017

Supply of 539 Sets of 3-seater classroooms furniture at GDSS Gumel, Supply of 724 3-Seater Classrooms

Furniture at GSS Maigatari, Supply of 539 Sets of 3-seater Classrooms furniture at GGDSS Gumel and Supply of

261 Sets of 3-Seater Classroom Furniture at GDSS Maigatari FGPC/166/2017/VOL.I/8 ABDULCOM PROJECT 40,950,550.00 Min of Education 8 Weeks

333 9/8/2017 Purchase of Fairly Used Armoured Lexus Jeep LX570 2013 Model. FGPC/129/2017/VOL.I/6 ZAAN MULTI TRADE 38,500,000.00 Govt. House 2 weeks

334 19/10/2017

Supply and Installation of 40 unit of 90 watts and 50 unit of 36 watts stand alone solar

powered streetlights in the premises of commissioner's qtrs., Dutse FGPC/244/2017/VOL.I/8 SIMS Global Resources 31,773,000.00 Min. of Works 4 weeks

335 19/10/2017

Supply and Installation of 40 unit of 90 watts and 50 unit of 36 watts stand alone solar

powered streetlights in and around five Building blocks at State Secretariat, Dutse FGPC/245/2017/VOL.I/8 SIMS Global Resources 33,361,650.00 Min. of Works 4 weeks

BALANCE C/F 10,460,080,386.18

Page 54: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD

(N)

BALANCE B/F 10,460,080,386.18

336 27/12/2017

Supply and disribution of 3-Seater Desks (Lot-1) at Senior Secondry Schools for 2017 1St

and 2nd Quarter Capital projects (Phase II) across the State. FGPC/310/2017/VOL.I/8 Modang Invest Ltd 13,919,062.50 Min of Education 6 weeks

337 27/12/2017

Supply and disribution of 3-Seater Desks (Lot-2) at Senior Secondry Schools for 2017 1St

and 2nd Quarter Capital projects (Phase II) across the State. FGPC/316/2017/VOL.I/8 Babandoki Gen. Ent. Ltd. 10,745,876.25 Min of Education 6 weeks

338 27/12/2017

Supply and disribution of 3-Seater Desks (Lot-4) at Senior Secondry Schools for 2017 1St

and 2nd Quarter Capital projects (Phase II) across the State. FGPC/329/2017/VOL.I/8 Wajab Building 11,244,675.96 Min of Education 6 weeks

339 27/12/2017

Supply and disribution of 3-Seater Desks (Lot-6 & 3) at Senior Secondry Schools for 2017

1St and 2nd Quarter Capital projects (Phase II) across the State. FGPC/315/2017/VOL.I/8 Abdulcom Proj. & Service 60,124,242.25 Min of Education 12 weeks

340 27/12/2017

Supply and disribution of 3-Seater Desks (Lot-7 & 5) at Senior Secondry Schools for 2017

1St and 2nd Quarter Capital projects (Phase II) across the State. FGPC/314/2017/VOL.I/8 Furni Elect Global 12,661,754.35 Min of Education 12 weeks

341 20/12/2017

Supply of 1.750No. 3-Seater Students Desks and benches to selected Arabic Senior

Secondry Schools FGPC/296/2017/VOL.I/7 Abdulcom Proj. & Service 34,912,500.00 Min of Education 12 weeks

342 20/12/2017

Supply of 1.242Nos. 3-Seater Students Desks and benches to some newly established

Senior Secondry Schools FGPC/295/2017/VOL.I/7 Furni-Elect Global 24,777,900.00 Min of Education 12 weeks

343 20/12/2017 Supply and installation of Solar Powered lightening System in Babura General Hospital. FGPC/292/2017/VOL.I/6 Sims Global Resources 20,984,971.88 Min of Health 8 Weeks

344 20/12/2017 Supply and installation of Solar Powered lightening System in GumelGeneral Hospital. FGPC/293/2017/VOL.I/6 Sims Global Resources 30,263,168.13 Min of Health 8 weeks

345 22/12/2017 procurement of E-Books Software for Senior Secondry Schools across the State FGPC/303/2017/VOL.1/6 Learn Africa Nig. Ltd 10,000,000.00 Min of Education 8 weeks

346 14/12/2017

Supply and installation s of 150 Units Integrated stadalone Solar Powered Streetght at

Aujara in Jahun Local Govt Area FGPC/262/2017/VOL.1/8 Sims Nig. Ltd. 95,192,680.94 Min of Works 12 weeks

SERVICES

347 11/4/2017

Supervision of the construction of Asphalt concrete Overlay of Tasheguwa-Guri Road

(42.14KM) FGPC/31/2013/VOL.I/38 EMACS ENG. CONSULTANT 41,228,554.70 Min of Works 12 months

348 18/05/2017

Supervision of the construction of Maigatari-Galadi-Girbobo-Diginsa-Birniwa Road

(Phase II) (37.1KM) FGPC/136/2012/VOL.I/171 HIMMA TECH SERV. 74,761,966.60 Min of Works 13 months

349 18/05/2017

Supervision of the construction of of Maigatari-Galadi-Girbobo-Diginsa-Birniwa Road

(Phase III) (44.7KM) FGPC/136/2012/VOL.I/173 HIMMA TECH SERV. 101,449,900.04 Min of Works 13 months

350 18/05/2017

Supervision of the construction of Arawa-Baturiya-Abunabo-Kadira-Guri Road (Phase

III) (33.7KM) FGPC/6/2012/VOL.I/95 LANDBASE ENG. SERV. 55,628,562.11 Min of Works 12 months

351 18/05/2017

Supervision of the construction of Andaza-Tsirma-Damutawa-Gadewa-Ajaura Road

(Phase II) (14.230KM) FGPC/51/2013/VOL.I/43 HARAD NIG LTD 29,194,382.97 Min of Works 12 months

BALANCE C/F 11,087,170,584.86

Page 55: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD

(N)

BALANCE B/F 11,087,170,584.86

352 11/4/2017 Supervision of the Rehabilitation of Kwanar Dundu-Bulangu Road (44KM) FGPC/59/2017/VOL.I/14 CURVES AND STR 58,048,209.43 Min of Works 14 months

353 11/4/2017

Supervision of the construction of JigawarDan-ali-Maitsamiya-Suletankarkar-

Dangwanki-Dankumbo to Matsatsagi (45KM) and construction of Kudai-Ruru-

Dantawuya-Sakwaya Feeder Road (15KM) FGPC/138/2012/VOL.I/199 UKM Civil Eng. 14,172,571.35 Min of Works 12 months

354 11/4/2017

Supervision of the construction of Gagarawa-Maisheda-Damaski Maikirabo-Madaka-

Mallam baki-Kangarwa-Bosuwa Road (SPUR from Madaka to Maikilili) (29.01KM) FGPC/139/2012/VOL.I/78 WURO ASSC ENGR & PRJ 59,790,551.40 Min of Works 14 months

355 11/4/2017

Supervision of the construction of Kila-Budinga-Rambazau-Tsangarwa-Nahuce-Isawa-

Jikas-Zandam Nagogo Road (48KM) FGPC/79/2013/VOL.I/44WOODHILL ENGR CONSULTANTS 82,710,290.75 Min of Works 14 months

356 11/4/2017

Supervision of the construction of Shuwarin-Wurma-Abaya-Chamo-Isari Feeder Road

(28.9KM) Garki-Fagen gawo-Kore Feeder Road (30.8KM) and construction of Manga-

Takwasa road (4.5KM) FGPC/22/2011/VOL.I/89 HAG ENG. CONSULTANTS 14,939,342.59 Min of Works 12 months

357 19/06/2017

Commissioning as Consultant on the Supervision of the Construction of Jahun

Township Roads (Phase II). FGPC/136/2012/VOL.I/191 HIMMA TECH LTD 16,450,774.46 Min of Works 8 months

358 19/07/2017

Commissioning as consultanat for the supervision of the Constr of Dolen Kwana-Batu-

Kuka Inkiwa- Kupsa Feeder Road (32.6Km) and Construction of Majingini- Maimazari-

dantuwo- Hannun Giwa- DanKumbo Feeder Road (11.5Km). FGPC/31/2013/VOL.I/56 EMACS ENG CONSULT 13,440,505.46 Min of Works 8 months

359 19/10/2017

Engagment as Consultant for the supervision of the Constr. Of New Specialist Hospital,

Hadejia FGPC/22/2011/VOL.I/104 HAG Eng. Nig. Ltd. Min of Health 16 months

TOTAL 11,346,722,830.30

Page 56: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

SECTION ( E )

COMPLETED PROJECTS

JANUARY TO DECEMBER, 2017

Page 57: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

Min of Heath

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

1

Constr. of Wall Fencing, Gate and House at the

Proposed Specialist Hospital, Hadejia Al-Bait Associates Hadejia 47,861,278.25 47,861,278.25 47,788,204.01 3/22/2016 4 months 100 Completed

2

Renovation/Improvement works at Ringim General

Hospital Mashasha Invest. Ltd. Ringim 87,762,051.25 87,762,051.25 84,511,017.81 9/9/2016 20 weeks 100 Completed

3

Completion of 2no. Lassa wards at Ebola centre,

Dutse Rasheed Shekoni Specialist Hospital SUB General Ventures Dutse 8,415,746.33 8,415,746.33 8,313,598.29 8/10/2016 8 weeks 100 Completed

4

Renov ation/Improv ement and Water Scheme at Kafin

Hausa General Hospital. MOJAZ CONSTR. LTD K/Hausa 88,167,500.26 107,626,046.60 101,989,132.40 12/5/2016 16 w eeks 100 Completed

5

Construction of Gate And Gate House, Wall Fencing of

Student's Hostel And Landscaping At New School of NGALOMA CONSTR. LTD Hadejia 51,906,083.98 51,906,083.98 51,799,733.24 12/5/2016 16 w eeks 100 Completed

6

General Renov ation /Improv ement of Maigatari Primary

Health Care (PHC). S.U.B. GENERAL VENT. LTD Maigatari 49,170,156.46 49,170,156.46 46,590,625.25 12/5/2016 16 w eeks 100 Completed

7

Constr. Of Prototype basic Health Clinic (BHC)

Across the State as Constituency Project at Arbus

in Kaugama Local Government Area. (change of

site) S.U.B GEN VENTURE Kaugama 19,523,847.08 19,523,847.08 17,699,981.00 21/08/2018 16 Weeks 100 Completed

8

Construction of prototype basic health clinic (BHC)

across the state as constituency project at

Zandam ta Gabas in Gwaram consitituency. S.U.B. GEN VENTURES Gwaram 19,522,270.50 19,522,270.50 18,463,437.21 30/5/2017 16 weeks 100 Completed

9

Constr. Of Prototype basic Health Clinic (BHC)

Across the State as Constituency Project at Rabadi

in Fagam, Gwaram Local Government Area.

(change of site) A.A MAIKATAKO GEN ENT Gwaram 19,723,317.80 19,723,317.80 18,547,651.50 21/08/2018 16 Weeks 100 Completed

10

Construction of prototype basic health clinic (BHC)

across the state as constituency project at Falgeri

in Buji consitituency. S.U.B. GEN VENTURES Buji 19,435,197.06 19,435,197.06 18,463,437.21 30/5/2017 16 weeks 100 Completed

11

Construction of prototype basic health clinic (BHC)

across the state as constituency project at

Tuminjira in Balangu constituency, Kafin Hausa

Local Government Area A.A. MAIKATAKO GEN ENT K/Hausa 19,723,317.80 19,723,317.80 18,782,851.50 30/5/2017 16 weeks 100 Completed

12

Construction of prototype basic health clinic (BHC)

across the state as constituency project at Fagi in

Birniwa consitituency. S.U.B. GEN VENTURES Birniwa 19,791,955.70 19,791,955.70 18,800,049.45 30/5/2017 16 weeks 100 Completed

13

Constr. Of Prototype basic Health Clinic (BHC)

Across the State as Constituency Project at

Madobi in Dutse Local Government Area. (change

of site) IMAM AHMAD NIG Dutse 19,595,410.37 19,595,410.37 18,527,705.00 18/08/2018 16 weeks 100 Completed

14

Constr. Of Prototype basic Health Clinic (BHC)

Across the State as Constituency Project at Rabadi

in Fagam, Gwaram Local Government Area. A.A MAIKATAKO GEN ENT Gwaram 19,723,317.80 19,723,317.80 18,547,651.50 21/08/2018 16 Weeks 100 Completed

15

General Renov./Improvement works at Kazaure

Primary Health Centre (PHC) Babandoki Gen. Entp. Kazaure 48,714,143.31 48,714,143.31 46,390,288.92 2/11/2017 16 weeks 100 Completed

16 Renov works at PHC Basirka in Gwaram Muhal Global Concept Gwaram 14,766,348.45 14,766,348.45 14,632,797.02 30/10/2017 8 Weeks 100 Completed

Total 539,035,593.95 573,260,488.74 Completed

Page 58: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

Min. of Water Resources

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

1

Conversion of Motorised Diesel powered water

schemes to Solar energy powered schemes

across the state at Sankara, Jigawa, Duzau and

Kiri Stations in Ringim zone (STOWA) MARB Eng. & Multy Serv . Ringim 22,958,250.00 22,958,250.00 22,900,854.38 4/29/2016 12 w eeks 100 Completed

2

Conversion of Motorised Diesel powered water

schemes to Solar energy powered schemes

across the state at Balago station in Dutse zone

(STOWA) Essence Worldw ide Serv . Dutse 5,739,562.50 5,739,562.50 5,725,213.60 4/29/2016 12 w eeks 100 Completed

3

Constr. o f Solar Powered Water Supply Schemes as

Constituency Pro ject at Doko in Garki Constituency Barwa Eng. Co. Ltd. Garki 6,155,625.00 6,155,625.00 6,140,241.19 7/2/2017 8 weeks 100 Completed

4

Constr. o f Hand pumps Water Supply Schemes (phase

II) as Constituency pro jects at Ung. Gabas, Rugar M aina

Duka, Rugar Adamu Chilaro, Rugar Lamido Gardi and

Rugar Hardo Ghamma in Birniwa Constituency. Hambiscon Nig. Ltd. Birniwa 2,762,025.00 2,762,025.00 2,755,119.94 29/3/2017 8 weeks 100 Completed

5

Conv.of Motorised Diesel powered water schemes

to Solar powered schemes across the state at

Ringim, Babura and Taura Stations in Ringim zone

(Water Board) Mutual Infrastructure Ringim 17,912,868.76 17,912,868.76 17,059,875.00 5/18/2016 12 w eeks 100 Completed

6

Conv.of Motorised Diesel powered water schemes

to Solar powered schemes across the state at

Dutse market and Mechanic village pump stations

in Dutse zone (Water Board) EAUXWELL Nig. Ltd. Dutse 7,871,850.00 7,871,850.00 7,497,000.00 5/18/2016 12 w eeks 100 Completed

7

Conv.of Motorised Diesel powered water schemes

to Solar powered schemes across the state at

Hadejia, Kiri kasamma and Guri stations in Hadejia

zone (Water Board) EAUXWELL Nig. Ltd. Hadejia 17,912,868.76 17,912,868.76 17,059,875.00 5/18/2016 12 w eeks 100 Completed

8

Rehab. of 4no. Water scheme at Basirka, Medu,

Hannun Giwa and Kore towns (STOWA) Laurat Global Ventures State 12,466,577.82 12,466,577.82 12,466,577.81 3/27/2016 8 weeks 100 Completed

9

Constr. of Solar Powered Water Supply Schemes as

Constituency Project at Zagau in Miga Constituency LOYALTY PROPERTIES LTD Miga 6,100,700.00 6,100,700.00 6,085,448.25 11/28/2016 8 weeks 100 Completed

10

Constr. of Solar Powered Water Supply Schemes as

Constituency Project at G/rafa in Buji Constituency LOYALTY PROPERTIES LTD Buji 6,104,700.00 6,104,700.00 6,089,438.25 11/28/2016 8 weeks 100 Completed

11 Improvement of Garki Town water supply Prestige Intergrated Serv . Garki 40,581,317.57 40,581,317.57 38,648,873.55 30/12/2016 100 Completed

BAL. C/F 146,566,345.41 146,566,345.41

Page 59: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 146,566,345.41 146,566,345.41

12

Constr. of Solar Powered Water Supply Schemes as

Constituency Project at Sabaru in Kazaure

Constituency MARB ENG. & MULTY LTD Kazaure 6,171,900.00 6,171,900.00 6,156,470.28 11/28/2016 8 weeks 100 Completed

13

Constr. of Solar Powered Water Supply Schemes as

Constituency Project at Gwangi in Ringim

Constituency MARB ENG. & MULTY LTD Ringim 6,169,800.00 6,169,800.00 6,154,375.50 11/28/2016 8 weeks 100 Completed

14

Constr. of Solar Powered Water Supply Schemes as

Constituency Project at Diddigau in Roni Constituency MARB ENG. & MULTY LTD Roni 6,175,050.00 6,175,050.00 6,159,612.38 11/28/2016 8 weeks 100 Completed

15

Constr. of Solar Powered Water Supply Schemes as

Constituency Project at Masallachin Izala in Mallam

Madori Constituency LIMIS BRO & CO. LTD M/Madori 6,200,250.00 6,200,250.00 6,184,749.38 11/29/2016 8 weeks 100 Completed

16

Constr. of Solar Powered Water Supply Schemes as

Constituency Project at Zangon Buji in Dutse

Constituency MISTAB ENERGY INVT.LTD Dutse 6,094,200.00 6,094,200.00 6,078,964.50 11/29/2016 8 weeks 100 Completed

17

Constr. of Solar Pow ered Water Supply Schemes as

Constituency Project at Kadane in Birnin Kudu

Constituency A.A. ALJAZEERA AGRO LTD B/Kudu 6,169,800.00 6,169,800.00 6,154,375.50 30/12/2016 8 w eeks 100 Completed

18

Constr. of Solar Pow ered Water Supply Schemes as

Constituency Project at Aduw are in Babura

Constituency M UFABAM EX CONCEPT LTD Babura 6,900,000.00 6,900,000.00 6,074,775.00 11/29/2016 8 w eeks 100 Completed

19

Constr. of Solar Pow ered Water Supply Schemes as

Constituency Project at Ramfa in Kafin Hausa

Constituency ADZ GLOBAL LTD K/Hausa 6,140,400.00 6,140,400.00 6,125,049.25 11/29/2016 8 w eeks 100 Completed

20

Constr. of Solar Pow ered Water Supply Schemes as

Constituency Project at Albashi in Kaugama

Constituency SALNAWU GLOBAL LTD Kaugama 6,129,900.00 6,129,900.00 6,114,575.25 11/29/2016 8 w eeks 100 Completed

21

Constr. of Solar Pow ered Water Supply Schemes as

Constituency Project at Garw a in Gw aram

Constituency A.A. ALJAZEERA AGRO LTD Gw aram 6,296,850.00 6,296,850.00 6,281,107.88 11/29/2016 8 w eeks 100 Completed

22

Constr. of Solar Pow ered Water Supply Schemes as

Constituency Project at Kangal in Taura Constituency NUSHE BUSINESS REC. LTD Taura 6,083,699.00 6,083,699.00 6,068,490.66 11/29/2016 8 w eeks 100 Completed

BAL. C/F 215,098,194.41 215,098,194.41

Page 60: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 215,098,194.41 215,098,194.41

23

Constr. of Solar Pow ered Water Supply Schemes as

Constituency Project at Akw ai ALLAH in Gagaraw a

Constituency DANM AWANKI NIG. LTD Gagaraw a 6,270,000.00 6,270,000.00 6,254,325.00 11/29/2016 8 w eeks 100 Completed

24

Constr. of Solar Pow ered Water Supply Schemes as

Constituency Project at Kokinami in Gumel

Constituency JAG & H INTERGRATED Gumel 6,094,200.00 6,094,200.00 6,078,964.50 11/29/2016 8 w eeks 100 Completed

25

Constr. of Solar Pow ered Water Supply Schemes as

Constituency Project at Andaza in Kiy aw a

Constituency DEM ASTBO VENTURES LTD Kiy aw a 6,162,922.50 6,162,922.50 6,147,515.19 11/29/2016 8 w eeks 100 Completed

26

Constr. of Hand pumps Water Supply Schemes as

Constituency Projects at Adugul, Kumo Rogo,

Dabazar Sambo, Fulanin Kankare and Daw an Dole in

Kany a Constituency Deetech NIG. LTD Babura 6,098,190.00 6,098,190.00 6,082,944.53 6/2/2017 8 w eeks 100 Completed

27

Constr. of Hand pumps Water Supply Schemes as

Constituency Projects at Balew a, Kazan Kukoki,

B/Gagare, Sharbi Kununu And Agur Mezan in Kafin

Hausa Constituency ADZ GLOBAL LTD K/Hausa 2,754,150.00 2,754,150.00 2,747,264.63 11/29/2016 8 w eeks 100 Completed

28

Constr. of Hand pumps Water Supply Schemes as

Constituency Projects at Maficin Sarki in Hadejia

Constituency BRIGHT STONE NIG LTD Hadejia 6,094,273.00 6,094,273.00 5,554,037.32 11/29/2016 8 w eeks 100 Completed

29

Constr. of Solar Pow ered Water Supply Schemes as

Constituency Project at Gunka Jahun Constituency BRIGHT STONE NIG LTD Jahun 6,094,373.00 6,094,373.00 5,554,137.06 11/29/2016 8 w eeks 100 Completed

30

Constr. of Solar Pow ered Water Supply Schemes as

Constituency Project at Mai-Hassan in Maigatari

Constituency BRIGHT STONE NIG LTD Maigatari 6,094,273.50 6,094,273.50 6,079,037.82 11/29/2016 8 w eeks 100 Completed

31

Constr. of Hand pumps Water Supply Schemes as

Constituency Projects at Bulakuru, Hausaw a,

Danw ay re, Botai and Baradu in Dutse Constituency M ISTAB ENERGY INVT.LTD Dutse 2,731,911.00 2,731,911.00 2,725,081.22 11/29/2016 8 w eeks 100 Completed

32

Constr. of Hand pumps Water Supply Schemes as

Constituency Projects at Makadi, Kay arda, Waje,

Fulanin Jarkasa And Tudun Yala Fulani in Babura

Constituency M UFABAM EX CONCEPT LTD Babura 2,562,000.00 2,562,000.00 2,293,751.25 11/29/2016 8 w eeks 100 Completed

BAL. C/F 266,054,487.41 266,054,487.41

Page 61: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 266,054,487.41 266,054,487.41

33

Constr. of Hand pumps Water Supply Schemes as

Constituency Projects at Gw aram Senior Arabic

Secondry School, Salmande, Daliy a, Rambazau And

Isaw a in Gw aram Constituency A.A. ALJAZEERA AGRO LTD Gw aram 2,773,500.00 2,773,500.00 2,766,566.25 11/29/2016 8 w eeks 100 Completed

34

Constr. of Hand pumps Water Supply Schemes as

Constituency Projects at Gidan Inusa M/Ruw a,Giginy a

Bakw ai, Mamuna, U/Yakubu And Kafin Alhaji in Buji

Constituency LOYALTY PROPERTIES LTD Buji 2,725,850.00 2,725,850.00 2,719,035.38 11/29/2016 8 w eeks 100 Completed

35

Constr. of Hand pumps Water Supply Schemes as

Constituency Projects at Tsakuw aw a, Agufa

K/Yamma, Gidan Garke Jagalari, Maduga Sabuw a and

Gidan Garba in Miga Constituency LOYALTY PROPERTIES LTD Miga 2,717,000.00 2,717,000.00 2,528,662.50 17/02/2017 8 w eeks 100 Completed

36

Constr. of Hand pumps Water Supply Schemes as

Constituency Projects at Kauy en Boka, Yalaw a, Marke

U/Ganji, B/Kudu Tsohon Gari And Unity School in

Birnin Kudu Constituency BULANGU DRILLING SERVICES. B/Kudu 2,562,000.00 2,562,000.00 2,152,080.00 11/29/2016 8 w eeks 100 Completed

37

Constr. of Hand pumps Water Supply Schemes as

Constituency Projects at Tsima Junctiona, Tashako,

Raba, Tsima Waje And Rigar Mana'e in Kiy aw a

Constituency DEM ASTBO VENTURES LTD Kiy aw a 2,747,850.00 2,747,850.00 2,664,172.88 11/29/2016 8 w eeks 100 Completed

38

Constr. of Hand pumps Water Supply Schemes as

Constituency Projects at Tukuikui, Rigar Zigobiy a

(Maraba), Lafiy a Rigar Lamido Kaw u, Kury a And Garin

Kaba in Guri Constituency A.Y.H. INVT LTD Guri 2,748,375.00 2,748,375.00 2,741,504.06 11/29/2016 8 w eeks 100 Completed

39

Constr. of Hand pumps Water Supply Schemes as

Constituency Projects at Jama'ar Fulani, Bundu, Goran

Fulani, Tsaunin Gora And Tsakanin Roni Constituency M ARB ENG. & M ULTY LTD Roni 2,775,150.00 2,775,150.00 2,649,051.01 11/29/2016 8 w eeks 100 Completed

40

Constr. of Hand pumps Water Supply Schemes as

Constituency Projects at Banbare Gidan Sallau, Ka'el

Village, Gizo Babba And Kabobi Village in Kazaure

Constituency M ARB ENG. & M ULTY LTD Kazaure 2,769,900.00 2,769,900.00 2,468,463.37 11/29/2016 8 w eeks 100 Completed

BAL. C/F 287,874,112.41 287,874,112.41

Page 62: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 287,874,112.41 287,874,112.41

41

Constr. of Hand pumps Water Supply Schemes as

Constituency Projects at Gaday aw a Fulanin Gabas

(Dagari), Nahuw a Fulani,Rubunji And Dan Gaw o in

Garki Constituency BARWA ENG COM P LTD Garki 2,728,425.00 2,728,425.00 2,114,440.65 11/29/2016 8 w eeks 100 Completed

42

Constr. of Hand pumps Water Supply Schemes as

Constituency Projects at Diliy ari, Madaci, Jiy an, Garin

Ando in Kiri-Kasamma Constituency ALH UM ARU BABANDOKI LTD K/Kasamma 2,764,125.00 2,764,125.00 2,757,214.69 11/29/2016 8 w eeks 100 Completed

43

Constr. of Hand pumps Water Supply Schemes as

Constituency Projects at Gabari, Garko, Sabuw ar

unguw a, Chadi And Yay ari in Hadejia Constituency M UHAL GLOBAL CONCEPT Hadejia 2,748,375.00 2,748,375.00 2,741,504.06 11/29/2016 8 w eeks 100 Completed

44

Constr. of Hand pumps Water Supply Schemes as

Constituency Projects at Boka Inusa Fulanin Magau,

Amanga v illage, Kabiw a v illage, Hardo Jauro Fulanin

D/Gumel and Fulanin Rambada in S/Tankarkar

Constituency UM ARCO ROOFING PROD. S/Tankarkar 2,748,375.00 2,748,375.00 2,661,618.75 11/29/2016 8 w eeks 100 Completed

45

Constr. of Hand pumps Water Supply Schemes as

Constituency Projects at U/kudu w aje Basirka,

Dikkw ana, U/Mal. Yusuf, Ganji and Gw adiko Asibiti in

Fagam Constituency RAM ADAN CONSTR. LTD Gw aram 2,773,312.50 2,773,312.50 2,766,379.22 11/29/2016 8 w eeks 100 Completed

46

Constr. of Solar Pow ered Water Supply Schemes as

Constituency Project at Rungo v illage in Fagam

Constituency RAM ADAN CONSTR. LTD Gw aram 6,223,350.00 6,223,350.00 6,207,791.63 20/02/2017 8 w eeks 100 Completed

47

Constr. of Solar Pow ered Water Supply Schemes as

Constituency Project at Garin Kosau in s/Tankarkar

Constituency UM ARCO ROOFING PROD. S/Tankarkar 6,083,699.90 6,083,699.90 6,068,490.66 11/29/2016 8 w eeks 100 Completed

48

Constr. of Solar Pow ered Water Supply Schemes as

Constituency Project at Ung. Malam in Yankw ashi

Constituency GRANITOID ENG. LTD. Yankw ashi 6,212,535.00 6,212,535.00 6,197,003.16 11/29/2016 8 w eeks 100 Completed

49

Constr. o f Hand pumps Water Supply Schemes as

Constituency Pro jects at Ganuwar Kuka, Kudigin,

Tsardawa, Tudun Gabi and Doguwar Tsamiya in Auyo

Constituency A.A. ALJAZEERA AGRO LTD Auyo 2,731,911.00 2,731,911.00 2,445,781.22 11/29/2016 8 weeks 100 Completed

50

Constr. o f Hand pumps Water Supply Schemes as

Constituency Pro jects at Luguwal, Kumo Rogo,

Dabazar Sambo, Fulanin Kankare and Dawan Dole in

Kanya Constituency Deetech NIG. LTD Babura 2,772,000.00 2,772,000.00 2,492,752.50 11/29/2016 8 weeks 100 Completed

51

Constr. o f Hand pumps Water Supply Schemes as

Constituency Pro jects at Karkarna town, Sabuwa

Fulani Gujiyar fulani, Kuda fulani and Rauda Fulani in

Yankwashi Constituency GRANITOID ENG. LTD. Yankwashi 2,748,375.00 2,748,375.00 2,741,504.06 11/29/2016 8 weeks 100 Completed

BAL. C/F 328,408,595.81 328,408,595.81

Page 63: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 328,408,595.81 328,408,595.81

52

Constr. o f Hand pumps Water Supply Schemes as

Constituency Pro jects at Gari Uku Fulani, Fulanin Bara

M usa, Leventis, Girdo and Garin Gabas in M alam-

M adori Constituency LIM IS BROTHERS & CO. M /madori 2,816,625.00 2,816,625.00 2,809,583.44 11/29/2016 8 weeks 100 Completed

53

Constr. o f Hand pumps Water Supply Schemes as

Constituency Pro jects at Fulanin Karanka, Fulanin

Diginsa (Rigar A lh. Isah), Fulanin Batu (Batu Yamma),

Fulanin Garagura and Fulanin Kubsa in Birniwa

Constituency Hambiscon Nig. Ltd. Birniwa 2,735,360.00 2,735,360.00 2,728,521.60 11/29/2016 8 weeks 100 Completed

54

Constr. o f Hand pumps Water Supply Schemes as

Constitutuency Pro jects at Sabuwar unguwa, Kurket

G/Dabo, Roran Fulani, Daba Yamma and Kawti in Gwiwa

Constitutuency Isah Halilu Nig. Ltd. Gwiwa 2,762,025.00 2,762,025.00 2,755,119.94 1/2/2017 8 weeks 100 Completed

55

Constr. o f Hand pumps Water Supply Schemes as

Constitutuency Pro jects at Dangwabro, Gwabso,

Walawa, M alam Lawan mai Nono and Rigar Baushi in

M aigatari Constitutuency Nadada Ventures Nig. Ltd. M aigatari 2,755,800.00 2,755,800.00 2,748,910.50 1/2/2017 8 weeks 100 Completed

56

Constr. o f Solar Powered water supply scheme at

Santar Hayo in Gwiwa Constituency. Isah Halilu Nig. Ltd. Gwiwa 6,176,625.00 6,176,625.00 6,161,183.44 1/2/2017 8 weeks 100 Completed

57

Constr. o f Hand Pumps Water Supply Schemes as

Constituency Pro jects at Sabon Garin Yaya yamma,

Fitatin (Kwalau ward), Gidan Nagi, Gama Kauye and

Chukwaikwaiwa in Taura Constituency. Nushe Business Resources Taura 2,780,800.00 2,780,800.00 2,773,848.00 14/3/2017 8 weeks 100 Completed

58

Constr. o f Hand Pumps Water Supply Schemes as

Constituency Pro jects at Turinjiran yamma, Fadawa

Karama, M alumawar Kiri, Shagen Gabas and M ajiya in

Bulangu Constituency. Bulangu Drilling Srvices K/hausa 2,759,500.00 2,759,500.00 2,752,601.25 9/3/2017 8 weeks 100 Completed

59

Constr. o f Hand Pumps Water Supply Schemes as

Constituency Pro jects at Arewawa, Jaruwa, Tunfusa

Arewa, Riga and GDSS Jahun in Jahun Constituency. M uhal Global Concept Jahun 2,748,375.00 2,748,375.00 2,638,371.29 6/3/2017 8 weeks 100 Completed

60

Constr. o f Hand Pumps Water Supply Schemes as

Constituency Pro jects at Digawar Hausawa Fulani,

U/Dawa, Kaka'aiki Zara, Zangon Sallau Gabas and

M ajiyawar Kanawa in Ringim Constituency. M arb Eng. & M ulty Serv. Ringim 2,769,285.00 2,769,285.00 2,598,273.04 7/3/2017 8 weeks 100 Completed

61

Constr. o f Hand Pumps Water Supply Schemes (phase

II) as Constituency pro jects at Baushina, Danya, Garin

Daudu and Unguwar Wala Shede in Kafin Hausa

Constituency. A &T Global Resources K/Hausa 2,209,620.00 2,209,620.00 2,204,095.95 29/3/2017 8 weeks 100 Completed

62

Constr. o f Hand Pumps Water Supply Schemes (phase

II) as Constituency pro jects at Kwandiga, Garin Kanya,

Kanya, M aina Binda, Arbu Kofar Liman, Yalleman

Hausawa, Bultuwa and Kuka Kwance in Kaugama

Constituency. A &T Global Resources Kaugama 4,419,240.00 4,419,240.00 4,408,191.90 5/4/2017 8 weeks 100 Completed

63

Constr. o f Solar Water Supply Schemes (phase II) as

Constituency pro jects at Ruba (kafin Hausa ward) in

Kafin Hausa Constituency. A &T Global Resources K/Hausa 6,250,650.00 6,250,650.00 6,235,023.37 29/3/2017 8 weeks 100 Completed

BAL. C/F 369,592,500.81 369,592,500.81

Page 64: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 369,592,500.81 369,592,500.81

64

Constr. o f Hand Pumps Water Supply Schemes (phase

II) as Constituency pro jects at M ajiyawa Kunama,

Layoyal, M argawa, Barebari, Jankawa, Farau and

Daguzau in Ringim Constituency. M arb Eng. & M ulti Serv. Ringim 3,866,835.00 3,866,835.00 3,857,167.91 29/3/2017 8 weeks 100 Completed

65

Constr. o f Hand Pumps Water Supply Schemes (phase

II) as Constituency pro jects at Katoge, Kofar A lh. Zabgi,

Tsamiyar Ilu and Fed. Govt. Girls College (FGC)

Kazaure in Kazaure Constituency. M arb Eng. & M ulti Serv. Kazaure 2,209,620.00 2,209,620.00 2,209,620.00 29/3/2017 8 weeks 100 Completed

66

Constr. o f Hand Pumps Water Supply Schemes (phase

II) as Constituency pro jects at Bosuwa Tsangaya,

Lallashi M akera, Hardo Jauro, Rugar M usa Ja'o ,

Fulanin Kankare, Hardo Gambo and Kaya Jamu in

M aigatari Constituency. M uhal Global Concept M aigatari 3,866,835.00 3,866,835.00 3,857,167.92 29/3/2017 8 weeks 100 Completed

67

Constr. o f Solar Powered Water Supply Scheme (phase

II) as Constituency pro jects at Kafi (Kanya ward) kanya

Constituency in Babura LGA. Deetech Nig. Ltd. Babura 6,075,825.00 6,075,825.00 6,060,635.43 29/3/2017 8 weeks 100 Completed

68

Constr. o f Solar Powered Water Supply Scheme (phase

II) as Constituency pro jects at M alam M adori

(M /M adori ward) in M alam M adori Constituency. Ramadan Constr. Ltd. M /M adori 6,250,650.00 6,250,650.00 6,235,023.37 29/3/2017 8 weeks 100 Completed

69

Constr. o f Solar Powered Water Supply Scheme (phase

II) as Constituency pro jects at M adachi (Kiri kasamma

ward) in Kirikasamma Constituency. Alh. Umar Baban Doki Ltd. Kirikasamma 6,270,000.00 6,270,000.00 6,254,325.00 29/3/2017 8 weeks 100 Completed

70

Constr. o f Solar Powered Water Supply Scheme (phase

II) as Constituency pro jects at Sabuwar Daba (M argadu

ward) in Guri Constituency. A.Y.H. Invest. Co. Ltd. Guri 6,144,600.00 6,144,600.00 6,129,238.50 29/3/2017 8 weeks 100 Completed

71

Constr. o f Solar Powered Water Supply Scheme (phase

II) as Constituency pro jects at Kore Sabuwa (Garin

Chiroma ward) in Gagarawa Constituency. Loyalty PropertiesLtd. Gagarawa 6,268,290.00 6,268,290.00 6,252,619.28 29/3/2017 8 weeks 100 Completed

72

Constr. o f Hand Pumps Water Supply Schemes (phase

II) as Constituency pro jects at Fulanin Kafa Ruwa, M ale

Fulani, Unguwar Shura, Baggade, Kankare, S/Unguwar

Hanyar Gumel, Gangara Bugaje, Unguwar Tsamiya,

M adalla, Takwasa, Jabirawa Fulani, Yantuba and

Gangara in Babura Constituency. M ufabamex Concept Ltd. Babura 7,181,265.00 7,181,265.00 7,163,311.83 29/3/2017 8 weeks 100 Completed

73

Constr. o f Hand Pumps Water Supply Schemes (phase

II) as Constituency pro jects at Gwaram, Jikas and

Dazara in Gwaram Constituency. A.A. A ljazeera Agro Properties Gwaram 1,657,215.00 1,657,215.00 1,653,071.96 29/3/2017 8 weeks 100 Completed

74

Constr. o f Hand Pumps Water Supply Schemes (phase

II) as Constituency pro jects at M azawa Kwanar Karo in

M iga Constituency. Loyalty Properties Ltd. M iga 552,405.00 552,405.00 552,405.00 29/3/2017 8 weeks 100 Completed

75

Constr. o f Hand Pumps Water Supply Schemes (phase

II) as Constituency pro jects at Gidan Riga, Dangolin

Kurori, M alamawa Narba, Kofar M alam Fulani and

Batsayi in Jahun Constituency. Loyalty Properties Ltd. Jahun 2,762,025.00 2,762,025.00 2,755,119.93 29/3/2017 8 weeks 100 Completed

76

Constr. o f Hand Pumps Water Supply Schemes (phase

II) as Constituency pro jects at Garin Dutse in Gagarawa

Constituency. Loyalty Properties Ltd. Gagarawa 552,405.00 552,405.00 552,405.00 29/3/2017 8 weeks 100 Completed

BAL. C/F 423,250,470.81 423,250,470.81

Page 65: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 423,250,470.81 423,250,470.81

77

Constr. o f Hand pumps Water Supply Schemes (phase

II) as Constituency pro jects at Takaji, Yayari Yamma,

Tubali and Gorawa in Bulangu Constituency, K/Hausa

LGA. Bulangu Drilling Serv. K/Hausa 2,209,620.00 2,209,620.00 2,121,179.96 29/3/2017 8 weeks 100 Completed

78

Constsruction of Hand pumps Water supply

schemes (phase II) as constituency project at

Baushe, Katanga, Tambai and Kadirawan G.

Sarki in Kafin Hausa constituency A &T GOLOBAL K/Hausa 2,209,620.00 2,209,620.00 2,093,891.15 13/04/2017 8 weeks 100 Completed

79

Constsruction of Hand pumps Water supply

schemes (phase II) as constituency project at

Kwandiga, Garin Kanya, Kanya, Maina Binda,

Arbu Kofar Liman, Yalleman Hausawa, Bultuwa

and Kuka Kwance in Kaugama constituency A &T GOLOBAL Kaugama 4,419,240.00 4,419,240.00 4,187,782.31 5/4/2017 8 weeks 100 Completed

80

Construction of Solar Powered Water supply

schemes (Phase II) as constituency Projects at

Kantudu (Zango Ward ) in Gumel constituency JAG&H INT SVC Gumel 6,250,650.00 6,250,650.00 6,235,023.38 29/03/2017 8 weeks 100 Completed

81

Construction of Water collection point Makara

Huta, Fantai Bayan Bitenary, Yan koli, IlLALLA,

Chadi, Garko baya GSS Wunti, Bello Bayi and

Bayan GSS Aminu Yusuf (Sabuwar Unguwa),

Gawuna in Hadejia constituency ZURFAT INVT NIG LTD Hadejia 9,874,848.00 9,874,848.00 9,381,105.46 4/5/2017 8 weeks 100 Completed

82

Provision of additional water scheme at

Mapower devlopment Institute, Dutse BABAN DOKI GEN ENT Dutse 29, 244, 451.95 29, 244, 451.95 29,084,624.63 16/5/2017 12 weeks 100 Completed

83

Constr. Of Solar powered water supply scheme

(phase II) as constituency projects at Karkarna in

Yankwashi Constituency. GRANATOIDS ENG SERV. Yankwashi 6,214,000.00 6,214,000.00 6,198,465.00 21/6/2017 8 weeks 100 Completed

84

Constr. Of Solar powered water supply scheme

(phase II) as constituency projects at Tattari in

Maigatari Constituency. Muhal Global Concept Maigatari 6,074,000.00 6,074,000.00 6,058,815.00 21/6/2017 8 weeks 100 Completed

85

Constr. Of 2no. Hand pumps Water Supply

Schemes (2016) constituency project) phase II at

Feluwai and Daragi in Gwiwa Constituency . Isah Halilu Nig. Ltd. Gwiwa 1,104,810.00 1,104,810.00 1,104,810.00 25/3/2017 8 weeks 100 Completed

86

Constr. Of Complete Solar Powered Water

Supply Scheme (2016 Constituency project

phase I) at Adaha in Auyo Constituency. A.A. Aljazeera Nig. Ltd. Auyo 6,298,950.00 6,298,950.00 5,856,322.50 29/11/2016 8 weeks 100 Completed

87

Constr. Of Complete Solar Powered Water

Supply Scheme (2016 Constituency project

phase I) at Wurmawa in Jahun Constituency. Loyalty Properties Jahun 6,268,290.00 6,268,290.00 6,268,290.00 29/03/2017 8 weeks 100 Completed

BAL. C/F 474,174,498.81 474,174,498.81

Page 66: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 474,174,498.81 474,174,498.81

88

Constr. Of handpumps water supply scheme(

Phase I-2017) as Constituency projects at

Danmarke, Bayan Gidan Lauya Jahun, Kabala

masallacin Idi Jahun, Gidan Jeji, Dingari Gidan

Makada, Gidan Dango Kofar Yamma and

Daradara in Jahun Constituency. LOYALTY PROPERTIES Jahun 5,593,350.00 5,593,350.00 5,579,366.63 28/08/2017 8 weeks 100 Completed

89

Constr. Of handpumps water supply scheme

(Phase I-2017) as Constituency projects at

Karkarna Sabuwa, Yankwashi Fulani, Gurjiya

Gari, Wusandu and Zango in

YankwashiConstituency. GRANATOIDS ENG Yankwashi 4,007,325.00 4,007,325.00 3,997,306.68 28/08/2017 8 weeks 100 Completed

90

Constr. Of Solar Powered Water Supply Schemes

(Phase I) as Constituency Project at Lafiya and

Adiyani in Guri Constituency AYH INVEST COMP LTD Guri 13,843,200.00 13,843,200.00 13,808,592.00 7/8/2017 8 Weeks 100 Completed

91

Constr. Of Solar Powered Water Supply Schemes

(Phase I) as Constituency Project at Farure in

Gwiwa Constituency THAQIB VENTURE LTD Gwiwa 6,967,800.00 6,967,800.00 6,950,380.50 7/8/2017 8 Weeks 100 Completed

92

Constr. Of Solar Powered Water Supply Schemes

(Phase I) as Constituency Project at Kadira in

Guri Constituency AYH INVEST COMP LTD Guri 6,921,600.00 6,921,600.00 6,904,296.00 7/8/2017 8 Weeks 100 Completed

93

Constr. Of Solar Powered Water Supply Schemes

(Phase I) as Constituency Project at Dunari,

Shayya and Majeri in Malam, Madori

Constituency LIMIS BROTHERS & CO M/madori 20,882,610.00 20,882,610.00 20,876,741.02 7/8/2017 8 Weeks 100 Completed

94

Constr. Of Solar Powered Water Supply Schemes

(Phase I) as Constituency Project at Dabawa and

Damfa in Babura Constituency MUFABAMEX CON LTD Babura 13,921,740.00 13,921,740.00 13,886,935.65 7/8/2017 8 Weeks 100 Completed

95

Constr. Of Solar Powered Water Supply Schemes

(Phase I) as Constituency Project at Kurjeni,

Kuduje and Rurau in Gwiwa Constituency MANHAF CONS NIG LTD Gwiwa 20,903,400.00 20,903,400.00 20,851,141.50 7/8/2017 8 Weeks 100 Completed

96

Constr. Of Solar Powered Water Supply Schemes

(Phase I) as Constituency Project at Unguwar

Bako and Gayawa in Garki Constituency ADZ GLOBAL SERV LTD Garki 13,666,020.00 13,666,020.00 13,631,854.95 7/8/2017 8 Weeks 100 Completed

97

Constr. Of Solar Powered Water Supply Schemes

(Phase I) as Constituency Project at Afarmo and

Tigima in Auyo Constituency ADZ GLOBAL SERV LTD Auyo 13,936,020.00 13,936,020.00 13,901,179.95 7/8/2017 8 Weeks 100 Completed

98

Constr. Of Solar Powered Water Supply Schemes

(Phase I) as Constituency Project at Kiyawa Town

in kiyawa Constituency ADZ GLOBAL SERV LTD Kiyawa 6,968,010.00 6,968,010.00 6,950,589.97 7/8/2017 8 Weeks 100 Completed

99

Constr. Of Solar Powered Water Supply Schemes

(Phase I) as Constituency Project at Kundu in

Taura Constituency NUSHE BUSINESS RESOR Taura 6,960,000.00 6,960,000.00 6,942,600.00 7/8/2017 8 Weeks 100 Completed

BAL. C/F 608,745,573.81 608,745,573.81

Page 67: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 608,745,573.81 608,745,573.81

100

Constr. Of Solar Powered Water Supply Schemes

(Phase I) as Constituency Project at Kawari in

Gwaram Constituency AZZIDS NIG LTD Gwaram 6,982,500.00 6,982,500.00 6,965,043.75 7/8/2017 8 Weeks 100 Completed

101

Constr. Of Solar Powered Water Supply Schemes

(Phase I) as Constituency Project at Nassarawa

in Gwaram Constituency AZZIDS NIG LTD Gwaram 6,982,500.00 6,982,500.00 6,965,043.75 7/8/2017 8 Weeks 100 Completed

102

Constr. Of Solar Powered Water Supply Schemes

(Phase I) as Constituency Project at Kigin in Auyo

Constituency K MANU GEN CONST Auyo 6,968,010.00 6,968,010.00 6,950,589.98 7/8/2017 8 Weeks 100 Completed

103

Constr. Of Solar Powered Water Supply Schemes

(Phase I) as Constituency Project at Bareye and

Jijjigawa in Gagarawa Constituency A.A ALJAZEERA Gagarawa 13,941,260.00 13,941,260.00 13,906,406.85 7/8/2017 8 Weeks 100 Completed

104

Constr. Of Solar Powered Water Supply Schemes

(Phase I) as Constituency Project at Murdan

Kasa, Karkarna Arewa and Sabowa in Yankwashi

Constituency GRANTOIDS ENG SERV Yankwashi 20,834,100.00 20,834,100.00 20,782,014.75 7/8/2017 8 Weeks 100 Completed

105

Constr. Of Solar Powered Water Supply Schemes

(Phase I) as Constituency Project at Narba in

Jahun Constituency LOYALTY PROPERTIES LTD Jahun 6,786,150.00 6,786,150.00 6,769,184.62 7/8/2017 8 Weeks 100 Completed

106

Constr. Of Solar Powered Water Supply Schemes

(Phase I) as Constituency Project at Nafadawa in

Miga Constituency LOYALTY PROPERTIES LTD Miga 6,943,378.50 6,943,378.50 6,926,020.05 7/8/2017 8 Weeks 100 Completed

107

Constr. Of Solar Powered Water Supply Schemes

(Phase I) as Constituency Project at Gatare in

Birniwa Constituency LOYALTY PROPERTIES LTD Birniwa 6,889.050.00 6,889.050.01 6,871,827.37 7/8/2017 8 Weeks 100 Completed

108

Supply of Solar Powered Water Supply pumps

(Phase I) as Constituency Project at Jana,

Amaguwa, Gidan Lage, Sankara and Kwandari in

Ringim Constituency MARB ENG & MULTI SERV Ringim 5,000,047.00 5,000,047.00 3,990,037.54 7/8/2017 8 Weeks 100 Completed

109

Constr. Of Solar Powered Water Supply Schemes

(Phase I) as Constituency Project at Kanya

Babba, Bata and Fadi at Kanya Babba

Constituency in Babura Constituency DEETECH NIG LTD Babura 21,424,662.00 21,424,662.00 21,371,100.35 11/8/2017 8 Weeks 100 Completed

BAL. C/F 704,608,181.31 704,608,181.31

Page 68: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 704,608,181.31 704,608,181.31

110

Constr. Of Hand Pumps Water Supply Schemes

(Phase I-2017) as Constituency Project at

Matsaro, Sabon Garu, Dubantu, Gabari, Layin

Alh Makeri Sabon Garu, Kantin Waje Bayan

Vocational, Yayari, Atafi, Chadi Anguwar Madaki,

Dallah, Bayan NTA, Bello Bayi, Makara Hutar

Duhu, Matsaro Layin Danbaba, Rumfa, Hudu and

Charbin Barau in Hadejia Constituency A. BARDE GLOBAL CON Hadejia 24,928,000.00 24,928,000.00 24,865,680.00 28/8/2017 8 Weeks 100 Completed

111

Constr. Of Hand Pumps Water Supply Scheme

(Phase I-2017) as Constituency Project at Gidan

Ja'o Hardo Kwalle, Matsatsagi, Baushe Sango,

Inwala, Tsinke, Musa Sayya, Hardo Sani,

Dausama, Tarana Sulani and Kiriha in Maigatari

Constituency NADADA VENTURES NIG Maigatari 8,809,762.50 8,809,762.50 8,787,738.09 28/8/2017 8 Weeks 100 Completed

112

Constr. Of Hand Pumps Water Supply Scheme

(Phase I-2017) as Constituency Project at

Unguwar Aliko (Jigawa Ward) Grave Yard Bayan

Asibiti Babura, Unguwar Makeri Insharuwa and

dan Amale Fulani in Babura Constituency MUFABAMEX CONCEPT Babura 3,202,000.00 3,202,000.00 3,193,995.00 28/8/2017 8 Weeks 100 Completed

113

Constr. Of Water Collection Points (Phase I-

2017) as Constituency Project at Kuloniya, Yan

Kwana-Kwana Mele, Maidabara and Karkasara

in Gumel Constituency JAG & H INT SERVICES Gumel 6,560,835.00 6,560,835.00 6,544,432.91 28/8/2017 8 Weeks 100 Completed

114

Constr. Of HandPumps Water Supply Schemes

(Phase I-2017) as Constituency Project at

Fulanin Garin Barka Arewa , Fulanin Dan Ama

Arewa, Danfarantama, Fulanin Barikin Faka and

Bekarya in Gumel Constituency JAG & H INT SERVICES Gumel 4,003,125.00 4,003,125.00 3,993,117.19 28/8/2017 8 Weeks 100 Completed

115

Constr. Of HandPumps Water Supply Schemes

(Phase I-2017) as Constituency Project at

Kundashe (Muku Ward) Jaya (Garki Ward) and

Government girls Secondary School Garki in

Garki Constituency ADZ GLOBAL SERVICES Garki 2,400,300.00 2,400,300.00 2,394,299.25 28/8/2017 8 Weeks 100 Completed

BAL. C/F 754,512,203.81 754,512,203.81

Page 69: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 754,512,203.81 754,512,203.81

116

Constr. Of HandPumps Water Supply Schemes

(Phase I-2017) as Constituency Project at Barka

(Andaza Ward), Rigar Amina Ward. Dadin Duniya

Andaza , Firera (Andaza Ward), Yar Auta (Garko

Ward), Gidan Rabo ( Fake Ward) Jigawar Kaba

(Katanga Ward) Masaya (Fake Ward) Adakawa (

Andaza Ward) Kanlaha Guduba ( Katuka Ward)

Unguwar Madaki ( Katuka Ward) gabashi (

Andaza Ward) Bushe (Andaza Ward) and Gidan

Malu in Kiyawa Constituency ADZ GLOBAL SERVICES Kiyawa 11,201,400.00 11,201,400.00 11,173,396.50 28/8/2017 8 Weeks 100 Completed

117

Constr. Of HandPumps Water Supply Schemes

(Phase I-2017) as Constituency Project at Fagoji,

Gundun Mazare, Bambam, Gida Dubu, Katujen

Gaba and gidan Gamai in Dutse Constituency TALAKU INT SERV LTD Dutse 4,794,300.00 4,794,300.00 4,782,314.25 31/8/2017 8 Weeks 100 Completed

118

Constr. Of HandPumps Water Supply Schemes (Phase

I-2017) as Constituency Proeject at Rigar Buba

M adugu, Safaman Ganji, Jangwan Babale, Rigar M allam

Yaya Zugobiya, Rigar M allam Buba, Rigar hardo

Auduru, Zugobiya, Bodala, Rigar lamido M anu, Rigar

lamido Ruwa, Dagana and M argadu Sabon Fegi in Guri

Constituency A.Y.H INVST COM P LTD Guri 9,597,420.00 9,597,420.00 9,573,426.45 12/9/2017 8 Weeks 100 Completed

119

Constr. Of HandPumps Water Supply Schemes as

Constituency Pro ject at Falkin Jalo Nasarawa, Fulanin

Kuka uku, Fulanin Liman M ado, Fulanin Gangara and

Fulanin Dan'ama Gabas in Gumel Constituency JAG & H INT SERVICES Gumel 2,742,600.00 2,742,600.00 2,735,743.50 29/08/2017 8 Weeks 100 Completed

120 Rehab and Upgrading of Sara Water Schemes Sims Global Resources Gw aram 18,506,250.00 18,506,250.00 18,459,984.38 20/12/2017 2 w eeks 100 Completed

121

Constr of Solar powered water shemes at

Jamaar suga town in K/kasamma. A.G. Global Golden Serv. K/kasamma 6,968,010.00 6,968,010.00 6,950,589.98 13/11/2017 8 Weeks 100 Completed

122

Constr. Of solar powered water schemes at

Tarabu in K/kasamma Loyalty Properties Ltd. K/kasamma 6,943,387.00 6,943,387.00 6,926,028.53 13/11/2017 8 Weeks 100 Completed

123 Constr o f 1no. Hand pump at M akwarari Fulani A. A. Aljazeera Agro Gagarawa 800,100.00 800,100.00 800,100.00 28/08/2017 2 weeks 100 Completed

124

Constr. o f Hand Pumps Water Supply Schemes (phase

II) as Constituency pro jects at Rigar Hardo Shuaibu,

Rugar Yola, Rugar Gambo Baki, Nasarawa Qtrs. Rugar

Gaiye Kujuru, M ajanguwa and Zoriyo in Guri

Constituency. A.Y.H. Investment Co. Guri 3,866,835.00 3,866,835.00 3,857,167.91 29/3/2017 8 weeks 100 Completed

T OT A L 819,932,505.81 819,932,505.81

Page 70: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

Min. of Works

P OST C ON T R A C T P R OJEC T EVA LUA T ION

S/ N . P R OJEC T EXEC UT OR LOC A T ION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS

AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %

1

Installation of solar=pow ered to electric-pow ered street light at Ringim tow n

(Additional & rev ised scope) Saby Int. Nig Ltd Ringim 27,542,025.00 65,127,841.10 46,298,150.15 18/9/09 20 w eeks 72 Completed

2 Consultancy Superv ision for the Constr. of Sukullufi-Aujara roads Himma Tech. Serv ices Jahun 73,320,508.60 73,320,508.60 73,319,457.65 31/12/2012 18 months 100 Completed

3 Urban Tow ns Streetlighting Project at M/madori Tow n Dutsen Taura Nig. LTD M/madori 280,310,404.50 280,310,404.50 280,202,842.50 11/11/2013 9 Months 100 Completed

4 Construction of Bamaina-zazika-Nasaru Road CGC Nig LTD B/kudu 1,095,894,699.37 1,587,926,018.26 1,587,926,018.26 2/13/2014 8 Months 100 Completed

5 Consultancy Serv ices for eastern by e pass (phase II) Landbase Eng. K/Kassamma 71,638,976.48 71,638,976.48 65,153,250.54 29/8/13 12 w eeks 100 Completed

6

Commissioning as Consultant on the superv ision of the Constr. of Maigatari-

Galadi-Karmashe-Karanka-Diginsa-Bursali-Kubsa-Birniw a road (114.6km)

(phase I) Himma Tech. Serv ices Maigatari 61,679,332.66 61,679,332.66 61,125,520.26 11/22/2013 16 months 100 Completed

7

Commissioning as Consultant on the Superv ision of the Constr. of Bamaina-

Zazika road Medal Civ il Eng. Consultants B/kudu 40,843,641.73 40,843,641.73 40,189,448.81 2/13/2014 10 months 100 Completed

8

Commissioning as Consultant on the Superv ision of the Urban Tow n

Streetlight Project at Auy o, M/Madori, K/Kasamma and 9No. General

Hospitals BOK Eng. Ltd. K/Kassamma 39,390,940.95 39,390,940.95 36,275,436.18 23/04/2014 100 Completed

9

Commissioning as Consultant on the superv ision of the Constr. of Andaza-

Tsirma-Gadiw a road spur from Fed. Road -Magama (phase 1) 45.73km Harad Nig. Ltd. Kiy aw a 55,376,646.51 55,376,646.51 53,868,283.74 5/22/2015 16 months 100 Completed

10

Constr. of Ky arama-Gasakole-Dadin Kow a-Danmakeri-Kasuw ar Dadi-

Sankara-Amaguw a-Tofa-Kagadama road (Spur from Ky arama to Shengel)

(29.95km) Geraw a Global Ringim 3,807,576,470.00 4,354,463,034.37 4,291,665,717.15 12/16/2014 18 months 100 Completed

11

Constr. of Andaza-Tsirma-Ataw ame-Damutaw a-Gadew a road & Spur from

Fed. Road-Damutaw a-Magama (45.73km) (phase I) Alren Constr. Co. Kiy aw a 3,861,309,347.91 3,861,309,347.91 3,855,875,910.04 1/19/2015 14 months 100 Completed

12

Letter of Commissioning/Engagement as Consultant for the Superv ision of

the Constr. of Ky arama-Kagadama road (spur from Ky arama-Shengel)

(29.95km) Himma Technical Serv ices Ringim 67,480,973.28 67,480,973.28 65,747,897.30 1/23/2015 18 months 100 Completed

13

Letter of Commisioning as Consultant on the Superv ision of the Constr. of

Roni-Mahuta-Bushe-Kay a-Tsakani-Gangare-Amary aw a-Mamudaw a-

Jigaw a-Gora-Gada road (49.19km) (phase II) UKM Civ il Eng. Roni 42,996,221.19 42,996,221.19 40,788,772.50 11/22/2015 18 months 100 Completed

14 Urban Tow ns Streetlighting Project at Garki Tow n Saby Int. Project LTD Garki 205,950,996.00 205,950,996.00 169,980,153.52 13/11/2013 8 Months 100 Completed

15 Constr. of Feeder road at Shafar-G/Sani-Daguzau in Ringim L.G.A. Yanduna v entures Ringim 326,872,816.20 326,872,816.20 315,510,451.20 17/02/2014 8 months 100 Completed

16 Commissioning as Consultant for the Constr. of K/Hausa Tow nship roads KAP Civ il Eng. K/Hausa 63,152,695.50 63,152,695.50 61,494,937.32 1/16/2012 12 months 100 Completed

17 Re-Constr. of Kafin Hausa Tow nship road (6.30km) Afdin Constr. Co. Ltd. K/Hausa 1,093,411,074.76 874,515,259.90 874,515,250.00 4/4/2016 8 months 100 Completed

18 Constr. of Roni-Amary aw a-Gada (phase II) Alren Constr. Co. Ltd. Kazaure 2,396,820,976.20 2,396,820,976.20 2,395,491,359.90 11/22/2013 24 months 100 Completed

19

Constr. of Gagaraw a-Maisheda-Damaski Maikirabo-Madaka-Mallam Baki-

Kangarw a-Bosuw a road (Spur from Madaka to Maikilili) (29.01km) Gerawa Global Eng. Ltd. Gagaraw a 3,416,602,936.95 3,416,602,936.95 3,409,546,179.90 28/12/2016 14 months 100 Completed

20 Constr. of Asphalt concrete ov erlay of Tasheguw a-Guri road (42.14km) CGC Nigeria Ltd. Guri 2,355,917,411.62 2,355,917,411.62 2,355,603,804.48 30/12/2016 15 months 100 Completed

Balance C/F 19,384,089,095.41 20,241,696,979.91

Page 71: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

P OST C ON T R A C T P R OJEC T EVA LUA T ION

S/ N . P R OJEC T EXEC UT OR LOC A T ION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS

AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %

Balance B/F 19,384,089,095.41 20,241,696,979.91

21 Construction of Manga-Takw asa road (4.5km) Feeder road Yanduna Ventures Nig. Ltd. Babura 64,396,253.25 64,396,253.25 64,086,015.00 28/12/2016 5 months 100 Completed

22

Constr. of Estern by e-pass road, Araw a-Kubay au-Masama-Gafta-Baturiy a-

Una(Spur to Yalw a-Musari)-Chacharan-Abunabo-Chapchapno-Lafiy a-Kadira-

Arinjasko-Matara-Abir-Guri road (phase II) (36km) CGC Nigeria Ltd. Kiri kasamma 3,918,044,342.91 3,918,044,342.91 3,888,415,559.18 5/4/2013 14 months 100 Completed

23

Constr. Of 2-SPAN Bridge as Change of Scope from 2No. 3-Cells box

culverts on Gwaram-Basirka road. Alren Constr. Co. Ltd. Gwaram 292,696,945.76 292,696,945.76 292,621,229.25 1/3/2017 6 months 100 Completed

24

Supply and Installation of Stand-Alone Solar Streetlight Poles with

Accessories (100 units) at Kanya Babba in Babura LGA. (change of

scope) SIMS Global Resoures Babura 63,283,500.00 63,283,500.00 63,283,500.00 6/3/2017 12 weeks 100 Completed

25

Supply and Installation of Stand-Alone Solar Streetlight Poles with

Accessories (100 units) along Old Police H/qtrs. To Garu road at

Dutse LGA. (change of scope) SIMS Global Resoures Dutse 63,283,500.00 82,479,600.00 82,479,600.00 6/3/2017 12 weeks 100 Completed

26

Supervision of the construction of of Maigatari-Galadi-Girbobo-

Diginsa-Birniwa Road (Phase III) (44.7KM) HIMMA TECH SERV. Maigatari 101,449,900.04 101,449,900.04 18/05/2017 13 months Completed

27

Supervision of the construction of Andaza-Tsirma-Damutawa-

Gadewa-Ajaura Road (Phase II) (14.230KM) HARAD NIG LTD Jahun 29,194,382.97 29,194,382.97 26,413,965.55 18/05/2017 12 months 100 Completed

28

Supervision of the construction of Gagarawa-Maisheda-Damaski

Maikirabo-Madaka-Mallam baki-Kangarwa-Bosuwa Road (SPUR

from Madaka to Maikilili) (29.01KM) WURO ASSC ENGR & PRJ Gagarawa 59,790,551.40 59,790,551.40 54,861,496.26 11/4/2017 14 months 100 Completed

29

Rehab. and Reconnection of Taura-Gujungu-Ajaura and Chuwasu-

Chakwaikwaiwa ITC Lines Al-majeed Constr. Co. Taura 29,567,211.07 29,567,211.07 29,370,109.59 3/3/2017 3 months 100 Completed

30

Consultancy services for the Constr. Of babaldu-Wurno-Jangargari-

Buji-Falgeri-Sagu road Wuro Associates Buji 55,961,055.70 55,961,055.70 55,959,750.00 2/12/2012 24 months 100 Completed

31 Consultancy services for the Constr. of Gwaram township road Himma Tech. Services Gwaram 57,075,600.00 57,075,600.00 57,033,860.84 17/12/2012 12 months 100 Completed

32

Constr. of Line Drain and Culvert (620M) at Dantanoma (Layin

Transformer in Gumel Town. PULLAD GLOBAL LTD Gumel 20,891,855.91 39,885,501.54 39,884,124.10 3/7/2017 12 weeks 100 Completed

33

Extention of Electricity at Bello Bayi, Agumau and Maman Wale

Quarters in Hadejia and Purchase of Thirty Five (35) Number

2.5KVA Gasoline Generators for Distrubution to Mosques in

Hadejia Constituency XTRAXX 99 INTGRATED Hadejia 54,237,645.52 54,237,645.52 54,224,458.51 13/09/2017 16 weeeks 100 Completed

34 Electrification of Kwadiya town in Dutse LGA. Al-sabur Global Links Dutse 21,304,075.72 21,304,075.72 21,301,811.56 11/9/2017 6 weeks 100 Completed

35 Re-constr. of Unity Pentagon Roundabout-Disina Junction road Retercha Co. Ltd. Dutse 70,942,298.85 70,942,298.85 70,942,284.79 20/11/2017 4 Weeks 100 Completed

36 Rehab. Of Karnaya to Dundubus ITC Line in Dutse LGA. Yalwa Oil & Gas Ltd. Dutse 5,114,056.50 5,114,056.50 5,114,056.50 22/11/2017 8 weeks 100 Completed

37 Constr. Of Andaza-Tsirma-Ataw ame-Damutaw a-Gadew a road (phase II) Alren Construction Co. Ltd. Jahun 1,858,611,617.41 1,858,611,617.41 1,858,611,617.41 19/10/2016 14 months 100 Completed

TOTAL 26,149,933,888.42 27,045,731,518.55

Page 72: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

Min. of Education

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT COMPL. STATUS REMARKS

AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K DATE PERIOD IN %

1 Furnishing of Academic and Admin. Block at Jigawa State University , K/Hausa Interior Wood Works K/Hausa 105,927,097.50 105,927,097.50 105,927,097.50 17/10/2014 4months 100 Completed

2

Constr. of Islamiyya classroom Blocks at Garki Cikin Gari and Kangari (Kargo

ward) in Garki Constituency MMZ Garki Constr. Ltd. Garki 5,606,595.50 5,606,595.50 5,606,595.50 29/12/2016 6 weeks 100 Completed

3

Constr. of Islamiyya classroom Blocks at Hammado Between G/Kailu and Garin-

Baki in Gumel Constituency JAG & H INT Gumel 5,575,714.53 5,575,714.53 5,575,714.53 29/12/2016 6 weeks 100 Completed

4

Constr. of Islamiyya classroom Blocks at Kagadama (Tofa ward) and J/Kadaje

(Ringim Ward) in Ringim Constituency MARB ENG.& MULT LTD. Ringim 5,385,740.22 5,385,740.22 5385740.22 29/12/2016 6 weeks 100 Completed

5

Constr. of Islamiy y a classrooms Blocks at Tigima and Safa-Karama in Auy o

Constituency A.A. ALJAZEERA AGRO Auy o 5,797,788.48 5,797,788.48 5,797,788.48 29/12/2016 6 w eeks 100 Completed

6

Constr. of Islamiy y a classrooms Blocks atYakana (Kanba Ward) and Z/Mundi

(Gasakoli Ward) in Kany a Babba Constituency Babubra Local Gov t Area DEETECH NIG LTD Babura 5,299,652.82 5,299,652.82 5,299,652.82 29/12/2016 6 w eeks 100 Completed

7

Constr. of Islamiy y a classrooms Blocks at Kw agga and Dandi in Kazaure

Constituency DEETECH NIG LTD Kazaure 5,416,454.82 5,416,454.82 5,416,454.40 29/12/2016 6 w eeks 100 Completed

8

Constr. of Islamiy y a classrooms Blocks at Medu and Kany u in Gagaraw a

Constituency M ODANG INVT LTD Gagaraw a 5,456,100.68 5,456,100.68 5,456,100.68 29/12/2016 6 w eeks 100 Completed

9

Constr. of Islamiy y a classrooms Blocks at Daragi/D. Sarki and Marganta in Gw iw a

Constituency ISA HALILUNIG LTD Gw iw a 5,590,792.62 5,590,792.62 5,590,792.62 29/12/2016 6 w eeks 100 Completed

10

Constr. of Islamiy y a classrooms Blocks at Hadejia Cikin Gari in Hadejia

Constituency UBJ NIG LTD Hadejia 5,579,391.68 5,579,391.68 5,579,391.67 29/12/2016 6 w eeks 100 Completed

11

Constr. of Islamiy y a classroom Blocks at Kaigamari and Malamaw ar Tudu in

Bulungu Constituency Kafin Hausa Local Gov t Area KAWU NIG LTD K/Hausa 5,613,437.06 5,613,437.06 5,613,437.06 29/12/2016 6 w eeks 100 Completed

12

Constr. of Islamiy y a classroom Blocks at Mairakumi Kashindula and Gandun Sarki

in Malam Madori Constituency AZZIDS NIG ENT LTD M/Madori 5,570,739.68 5,570,739.68 5,570,739.68 29/12/2016 6 w eeks 100 Completed

13

Contract. of Islamiy y a classroom Blocks at Ban'iy aka and Mamudaw a in Roni

Constituency UM AR ALIYU & SONGS LTD Roni 5,291,539.60 5,291,539.60 5,291,539.60 29/12/2016 6 w eeks 100 Completed

14

Constr. of 2NO. Block of Six Seater Pit Latrine and Renov ation of Students Hostel at

GGSS Sule Tankarkar. STEP BY STEP INT LTD S/tankarkar 17,374,267.13 17,374,267.13 17,370,747.64 30/12/2016 8 w eeks 100 Completed

15 Renov ation of classroom Block at GGASS Danzomo (9no.) YAYARIN TUKUR NIG LTD S/tankarkar 16,329,231.83 16,329,231.83 16,206,031.41 30/12/2016 8 w eeks 100 Completed

16 Renov ation of classroom Blocks at GGASS Babura. WAJAB BUILDING & CONSTR. Babura 14,637,375.54 14,637,375.54 14,585,218.68 30/12/2016 8 w eeks 100 Completed

17 Renov ation of 13NO. Students Hostel at GGASS Babura BABANDOKI GEN ENT LTD Babura 32,055,802.60 32,055,802.60 30,524,201.65 30/12/2016 7 w eeks 100 Completed

18 Renov ation of 5NO. Staff Quarters at GGASS Babura BABANDOKI GEN ENT LTD Babura 37,105,584.99 37,105,584.99 36,534,123.05 30/12/2016 7 w eeks 100 Completed

BAL. C/F 289,613,307.28 289,613,307.28

Page 73: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT COMPL. STATUS REMARKS

AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K DATE PERIOD IN %

Bal. B/F 289,613,307.28 289,613,307.28

19 Renov ation of 6NO. Junior Staff Quarters at GGASS Danzomo (A) M OJAZ CONSTR LTD S/tankarkar 20,644,859.82 22,969,092.72 22,949,098.58 30/12/2016 7 w eeks 100 Completed

20 Renov ation of 6NO. Junior Staff Quarters at GGASS Danzomo (B) M OJAZ CONSTR LTD S/tankarkar 20,644,859.82 22,969,092.72 22,949,098.58 30/12/2016 8 w eeks 100 Completed

21 Construction of 2NO. Block of Six Seater Pit Latrineat GUSS Malam Madori. HARUNA LADAN INVT M/madori 3,721,904.40 3,721,904.40 3,552,740.48 30/12/2016 12 w eeks 100 Completed

22 Construction of 1NO.Students Hostel at GUSS Aujara M ODANG INVT LTD Jahun 25,625,472.89 25,625,472.89 25,602,883.22 30/12/2016 8 w eeks 100 Completed

23 Contract For the Construction of 2NO. Block of 3-Classroom at GGUSS Kazaure NABCOM TECH NIG LTD Kazaure 15,483,179.18 15,483,179.18 15,476,538.46 30/12/2016 8 w eeks 100 Completed

24 Constr. Of Line Drainage at GUSS Malam Madori HARUNA LADAN INVT M/madori 13,249,740.69 13,249,740.69 12,681,057.13 30/12/2016 8 w eeks 100 Completed

25 Renov ation of Senior Staff Quarters at Gov t Girls Arabic Secondary School Babura. A.H.F. GLOBAL NIG LTD Babura. 36,842,654.55 36,842,654.55 36,704,498.23 30/12/2016 8 w eeks 100 Completed

26 Constr. Of 1NO. Students Hostel at GUSS Malam Madori (A) HARUNA LADAN INVT M/madori 25,625,472.89 27,815,040.00 27,808,474.38 30/12/2016 12 w eeks 100 Completed

27 Constr. of 1NO. Students Hostel at GUSS Malam Madori (B) HARUNA LADAN INVT M/madori 25,625,472.89 27,815,040.00 27,808,474.38 30/12/2016 12 w eeks 100 Completed

28 Constr. Of 1NO. Students Hostel at GUSS Malam Madori (C ) HARUNA LADAN INVT M/madori 25,625,472.89 27,815,040.00 27,808,474.38 30/12/2016 12 w eeks 100 Completed

29

Contract For the Renov ation of Admin Block, ICT, Biology Lab and Toilets at GSS

Aujara M ODANG INVT LTD Jahun 7,538,982.10 7,538,982.10 7,031,853.41 30/12/2016 8 w eeks 100 Completed

30 Constr. Of Students Hostel at GUSS Malam Madori (D) HARUNA LADAN INVT M/madori 25,625,472.89 27,815,040.00 27,808,474.38 30/12/2016 8 w eeks 100 Completed

31

Contract For the Renov ation of Students Hostel at Gov t Girls Unity Secondry School

Kazaure AL-HAM SAD INVT LTD Kazaure 11,391,437.71 11,391,437.71 11,390,392.10 30/12/2016 7 w eeks 100 Completed

32

Constr. Of 2-Block of Six Saeter Pit Latrine and Renov ation of Dutse House at Gov t

Girls Unity Secondry School Kazaure. M UTAL INFRASTRUCTURE LTD Kazaure 9,039,611.35 9,039,611.35 8,773,990.17 30/12/2016 8 w eeks 100 Completed

33 Constr. of 1no. Students Hostel at Gov t Girls Unity Secondry School Kazaure AL-HAM SAD INVT LTD Kazaure 25,625,472.75 25,625,472.75 25,616,340.76 30/12/2016 8 w eeks 100 Completed

34 Renov ation of Students Hostel at Gov t Girls U nity Secondry School Kazaure M UTAL INFRASTRUCTURE LTD Kazaure 14,804,448.60 14,804,448.60 14,698,590.09 30/12/2016 7 w eeks 100 Completed

35 Constr. Of 5NO. Block of Six Seater pit Latrine at GUSS Malam Madori M .I. JAHUN COM M & GEN ENT M/madori 9,304,761.00 9,304,761.00 9,113,376.20 30/12/2016 12 w eeks 100 Completed

36 General Renov ation of 3NO. Classroom Blocks at GGASS Danzomo ALLAH ABIN DOGARA ENT Gagaraw a 11,940,648.89 11,940,648.89 11,906,824.19 30/12/2016 8 w eeks 100 Completed

37 Renov ation of Senior StaffQUARTERS at GGASS Danzomo UM AR ALIYU & SONGS LTD Gagaraw a 8,986,440.89 8,986,440.89 8,595,000.62 30/12/2016 7 w eeks 100 Completed

38 Renov ation of 6no. Students Hostels at GGASS Danzomo AL-SAHIH GEN ENT LTD Gagaraw a 14,586,233.24 14,586,233.24 14,548,234.14 30/12/2016 8 w eeks 100 Completed

39

Constr. of Islamiy y a classroom Blocks at J/w aw u and S/gari malanta in

Kirikasamma Constituency Alh. Umaru Babandoki K/kassamma 5,811,197.99 5,811,197.99 5,811,197.99 29/12/2016 6 w eeks 100 Completed

40

Constr. of Islamiy y a classroom Blocks at Gany aw a (Majiy aw a w ard) and Kauy an

Mata (Kw alam w ard) in Taura Constituency Abugani Gen. Invest. Taura 4,994,767.54 4,994,767.54 4,994,767.15 29/12/2016 6 w eeks 100 Completed

41

Constr. of Islamiy y a classroom Blocks at Zandam ta Gabas and Gw aram k/Gabas

in Gw aram Constituency Nushe Business Res. Gw aram 5,011,526.08 5,011,526.08 5,011,526.08 29/12/2016 6 w eeks 100 Completed

42

Constr. of Islamiy y a classroom Blocks at Sule-tankarkar cikin gari and Takatsaba in

S/tankarkar Constituency Nushe Business Res. S/tankarkar 5,592,369.88 5,592,369.88 5,592,369.69 29/12/2016 6 w eeks 100 Completed

43

Constr. of Islamiy y a classroom Blocks at B/k gari and Kantoga in B/kudu

Constituency Nushe Business Res. B/kudu 5,592,369.68 5,592,369.68 5,592,369.69 29/12/2016 6 w eeks 100 Completed

44

Supply of 1020NO. 3-Seater Desks and Benches to Some Boarding Senior

Secondary Schools Across the State. NADAK IND LTD Across the state 15,311,704.50 15,311,704.50 15,311,704.50 30/12/2016 3 w eeks 100 Completed

BAL. C/F 683,859,842.39 697,266,576.63

Page 74: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT COMPL. STATUS REMARKS

AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K DATE PERIOD IN %

Bal. B/F 683,859,842.39 697,266,576.63

45

Supply of 760NO. Double bunk Bed to Some Boarding Senior Secondary Schools

Across the State. AL-HAM SAD INVT LTD Across the state 21,683,457.78 21,683,457.78 21,683,457.78 30/12/2016 3 w eeks 100 Completed

46

Constr. of Islamiy y a classroom Blocks at Karkarna and Yankw ashi Cikin Gari in

Yankw ashi Constituency . Granitoids Eng. Serv ices Ltd. Yankw ashi 5,811,197.99 5,811,197.99 5388504.57 29/12/2016 6 w eeks 100 Completed

47

Constr. of Islamiy y a classroom Blocks at Basirka fada and Basirka Wudilaw a in

Fagam Constituency , Gw aram LGA Ramadan Constr. Limited Gw aram 5,540,390.40 5,540,390.40 5,540,390.40 29/12/2016 6 w eeks 100 Completed

48

Constr. of Islamiy y a classroom Blocks atAndaza gabas and Markiba in Kiy aw a

Constituency . Damastbo Ventures Ltd. Kiy aw a 5,597,930.52 5,597,930.52 5,597,930.52 29/12/2016 6 w eeks 100 Completed

49

Constr. of Islamiy y a classroom Blocks at Majjanna/Diginsa w ard and Kakori/Birniw a

w ard in Birniw a Constituency . Gidan Adede Gen. Entp. Ltd. Birniw a 5,449,021.81 5,449,021.81 5,449,021.80 15/02/2017 6 w eeks 100 Completed

50

Constr. of Islamiy y a classroom Blocks at Tsakuw aw a and Gululu in Miga

Constituency . Loy alty Properties Ltd. Miga 5,493,579.61 5,493,579.61 5,493,579.60 29/12/2016 6 w eeks 100 Completed

51

Constr. of Islamiy y a classroom Blocks at Achau B/titi and Farfada Village in Jahun

Constituency . Loy alty Properties Ltd. Jahun 5,604,756.94 5,604,756.94 5,604,756.94 29/12/2016 6 w eeks 100 Completed

52

Constr. of Islamiy y a classroom Blocks at Dutse Dubeni (Madobi w ard) and Sabuw ar

Takur in Dutse Constituency . Al-kasam Jannah Nig. Ltd. Dutse 5,551,958.00 5,551,958.00 5,551,958.00 29/12/2016 6 w eeks 100 Completed

53

Constr. of Islamiyya Classroom Blocks at Shabarawa (Fulata ward) and

Tsirya (Madana ward) in Maigatari Constituency Muhabib Nig. Ltd. Maigatari 5,592,369.68 5,592,369.68 5,592,396.68 29/12/2016 6 weeks 100 Completed

54

Constr. of Second phase Islamiyya Classroom block at Dangyatin in Miga

Constituency AMIA Integrated Serv. Miga 2,746,789.80 2,746,789.80 2,746,789.80 20/3/2017 6 weeks 100 Completed

55

Constr. of Second phase Islamiyya Classroom blocks at Gidan Kanawa

(Kanya ward) in Kanya Babba Constituency in Babura LGA. Detech Nigeria Ltd. Babura 2,649,826.41 2,649,826.41 2,649,826.41 20/3/2017 6 weeks 100 Completed

56

Constr. of Second phase Islamiyya Classroom blocks at Jabo town in

Bulangu in Constituency in K/Hausa LGA. Kawu Nigeria Ltd. K/Hausa 2,805,718.53 2,805,718.53 2,805,718.53 4/4/2017 6 weeks 100 Completed

57

Constr. of Second phase Islamiyya Classroom blocks at Janbulo (Arewa

ward) in Kazaure Constituency Dutse Taura Constr. Co. Kazaure 2,708,227.41 2,708,227.41 2,708,227.41 20/3/2017 6 weeks 100 Completed

58

Constr. of Second phase Islamiyya Classroom blocks at Guntai ward in

Gwiwa Constituency. Isah Halilu Nig. Ltd. Gwiwa 2,795,396.31 2,795,396.31 2,795,369.31 4/4/2017 6 weeks 100 Completed

59

Constr. of Second phase Islamiyya Classroom block at Madaci town in

Kirikasamma Constituency. Alh. Umar Baban Doki Ltd. Kirikasamma 2,801,000.00 2,801,000.00 2,801,000.00 20/3/2017 6 weeks 100 Completed

60

Constr. of Second phase Islamiyya Classroom blocks at Agamo (Gamawa

Juwai ward) in Auyo Constituency. A.A. Aljazeera Agro Properties Auyo 2,898,894.24 2,898,894.24 2,898,872.19 4/4/2017 6 weeks 100 Completed

61

Constr. of Second phase Islamiyya Classroom block at Jahun town behind

police stationin Jahun Constituency. Loyalty Properties Ltd. Jahun 2,800,000.00 2,800,000.00 2,800,000.00 20/3/2017 6 weeks 100 Completed

62

Construction of second Phase Islamiyya Classroom block at Addani

(Gurjiya Ward) in Yankwashi constituency GRANATOIDS ENGR Yankwashi 2,694,252.27 2,694,252.27 2,694,252.27 20/3/2017 6 weeks 100 Completed

63

Procurement and Apply of Termites and Bats Control Chemicals for 87no.

Schools across the State Ngloma Constr. Co. Across the state 12,789,000.00 12,789,000.00 12,180,000.00 19/4/2017 8 weeks 100 Completed

64 Purchase of 2,000 Sets of Classroom Furniture FURNI-ELECT GLOBAL Across the state 30,000,000.00 30,000,000.00 30,000,000.00 20/04/2017 12 weeks 100 Completed

BAL. C/F 817,873,610.09 831,280,344.33

Page 75: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 817,873,610.09 831,280,344.33

65 Purchase of 4,000 Sets of Classroom Furniture ABDUL-COM PROJECT Across the state 60,000,000.00 60,000,000.00 60,000,000.00 20/04/2017 12 weeks 100 Completed

66

Constr of Islamiyya Classroom at Andaza and Markiba in Kiyawa

Constituency Damastbo Ventures Ltd. Kiyawa 5,597,930.52 5,597,930.52 5,597,930.52 29/12/2016 6 months 100 Completed

67

Constr of second phase Islamiyya classroom block at Janbulo (Arewa

ward) in kazaure constituency. Dutsen Taura Nig. Ltd. Kazaure 2,708,227.41 2,708,227.41 2,708,227.41 22/03/2017 6 months 100 Completed

68

Constr of Islamiyya classroom blocks at Gudduba (Kukuma ward) and Tijiyo

(Tijiyo ward) in Buji constituency Loyalty Properties Buji 5,449,021.80 5,449,021.80 5,449,021.80 29/12/2016 6 weeks 100 Completed

69

Constr of Islamiyya classroom blocks at Kadira cikin gari and Adiyani in

Guri constituency Limis Brothers & Co. Guri 5,871,760.20 5,871,760.20 5,871,760.20 12/1/2017 8 weeks 100 Completed

70

Constr of Islamiyya classroom blocks at Karkarna and Yankwashi cikin gari

in Yankwashi Constituency Grantoids Yankwashi 5,388,504.54 5,388,504.54 5,388,504.54 12/1/2017 8 weeks 100 Completed

71

Constr. Of Islamiyya Classroom Blocks as Constituency Project at Aci Lafia

and Kudu in Yankwashi Constituency GRANATOIDS ENG Yankwashi 6,555,993.40 6,555,993.40 23/08/2017 8 weeks 100 Completed

72

Constr. Of Islamiyya Classroom Blocks as Constituency Project at Kan Tudu

Madaka and Amaryawa in Roni Constituency NA'AYI RESOURCE Roni 9,818,688.60 9,818,688.60 9,346,188.60 23/08/2017 8 weeks 100 Completed

73

Constr. Of Islamiyya Classroom Block as Constituency Project at Danya and

Doko in Garki Constituency MMZ GARKI CONST Garki 6,531,598.05 6,531,598.05 6,216,598.50 23/08/2017 8 weeks 100 Completed

74

Constr. Of Islamiyya Classroom Blocks as Contituency Project at Kantudu,

Bandutse, Kabori Gabas, Sha'iskawa and Fatare in Kazaure Constituency DUTSEN TAURA CONST Kazaure 19,650,342.00 19,650,342.00 17,045,458.50 23/08/2017 10 Weeks 100 Completed

75

Constr. Of Islamiyya Classroom Blocks 2017 Constituency Project Phase I

at Matarar Galadima, Gamji and Madugunari in Kiri-Kasamma Local

Government Area. ALH. UMAR BABANDOKI K/Kasamma 9,774,818.04 9,774,818.04 9,546,831.00 16/08/2017 7 Weeks 100 Completed

76

Constr. Of Islamiyya Classroom Blocks 2017 Constituency Project Phase I

at Abujan Amare, Bello Bayi Islamiyya, Garko and Malam Abare Islamiyya

in Hadejia Local Government Area. NA-BAKWAI GEN ENT LTD Hadejia 13,118,021.60 13,118,021.60 12,537,513.03 16/08/2017 7 Weeks 100 Completed

77

Constr. Of Islamiyya Classroom Blocks 2017 Constituency Project Phase I

at Sabuwar Daula, Zango and Alfa in Miga Local Government Area. A.BARDE GLOBAL CON Miga 9,833,550.03 9,833,550.03 9,360,184.05 16/08/2017 6 Weeks 100 Completed

78

Constr. Of a block of 3-Class Rooms, Constr.. Of an Admin, Block, Constr. Of

2No. 6 Seater VIP Toilets and Provision of 1No. Hand Pump at GGDSS

K/Hausa IMAM AHMAD NIG LTD K/Hausa 29,141,489.44 29,141,489.44 28,996,659.13 24/08/2017 12 Weeks 100 Completed

79

Constr. Of a block of 3-Class Rooms, Constr.. Of an Admin, Block, Constr. Of

2No. 6 Seater VIP Toilets and Provision of 1No. Hand Pump and Constr. Of a

Block of Laboratory at GGDSS Birnin Kudu SABON GARIN YAYA B/Kudu 38,086,803.23 38,086,803.23 37,874,903.28 24/08/2017 12 Weeks 100 Completed

BAL. C/F 1,045,400,358.95 1,058,807,093.19

Page 76: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 1,045,400,358.95 1,058,807,093.19

80 Constr. Of Ten (10No) Blocks 6-Seater VIP Latrines at G.U.S.C Dutse NGALOMA CONST LTD Dutse 23,584,995.60 23,584,995.60 22,268,182.33 24/08/2017 12 Weeks 100 Completed

81

Supply of 660 Set of 3Seater Class Room Furniture at GDSS Roni, Supply of

110 3Seater Class Rooms Furniture at GDSS Gada, Supply of 385 Sets of 3

Seater ClassRooms Furniture at GGDSS Kazaure and Supply of 330 Sets of NAKOWA GEN ENT Various 29,894,720.05 29,894,720.05 29,894,720.05 18/08/2017 8 Weeks 100 Completed

82

Purchase of Classroom Furniture (GGUSS Kazaure, GUSS Maigatari, GDSS

Babura, GGUSS M/Madori, GDSS Garun Gabas, GDSS Bulangu, GUSS Basirka

and GGUSS Gw aram). MUTUAL INFRASTRU Various 64,471,284.66 64,471,284.66 64,471,284.66 22/08/2017 12 w eeks 100 Completed

83

Supply of 958 Sets of 3 Seater ClassRooms Furniture and Supply of 1056 3 Seaters

Class Rooms Furniture at GSS Fantai and Gss Famfo Goma, Hadejia. FURNI ELECT GLOBAL VEN Hadejia 39,977,900.00 39,977,900.00 39,977,900.00 24/08/2017 8 w eeks 100 Completed

84

Procurement of Assorted Biology Laboratory Equipment at 8No. Centre of

Ex ecellence(GGUSS Kazaure, GUSS Maigatari, GDSS Babura, GGUSS M/Madori,

GDSS Garun Gabas, GDSS Bulangu, GUSS Basirka and GGUSS Gw aram) A.A MAIKATAKO GEN ENT Various 34,903,627.50 34,903,627.50 34,903,627.50 18/08/2017 16 w eeks 100 Completed

85

Procurement of Assorted Chemistry Laboratory Equipment at 8No. Centres of

Ex ecellence (GGUSS Kazaure, GUSS Maigatari, GDSS Babura, GGUSS M/Madori,

GDSS Garun Gabas, GDSS Bulangu, GUSS Basirka and GGUSS Gw aram) A.A MAIKATAKO GEN ENT Various 34,197,019.50 34,197,019.50 34,197,019.50 18/08/2017 8 Weeks 100 Completed

86

Procurement of Assoorted Phy sics Laboratory Equipments at 8No. Centres of

Ex cellence (GGUSS Kazaure, GUSS Maigatari, GDSS Babura, GGUSS M/Madori,

GDSS Garun Gabas, GDSS Bulangu, GUSS Basirka and GGUSS Gw aram) MUGIN INVT LTD Various 37,043,435.93 37,043,435.93 37,043,435.92 21/08/2017 8 Weeks 100 Completed

87

Supply of 539 Sets of 3-seater classroooms furniture at GDSS Gumel, Supply of 724

3-Seater Classrooms Furniture at GSS Maigatari, Supply of 539 Sets of 3-seater

Classrooms furniture at GGDSS Gumel and Supply of 261 Sets of 3-Seater

Classroom Furniture at GDSS Maigatari ABDULCOM PROJECT Various 40,950,550.00 40,950,550.00 40,950,550.00 24/08/2017 8 Weeks 100 Completed

88

Constr. Of Islamiyya classroom blocks as Constituency project at

U/marayu, Fulanin Kangire and Wurno in Birnin Kudu constituency. Nushe Resources B/Kudu 9,819,816.00 9,819,816.00 9,504,815.98 5/12/2017 8 weeks 100 Completed

89

Supply of 1.750No. 3-Seater Students Desks and benches to selected

Arabic Senior Secondry Schools Abdulcom Proj. & Service Across the state 34,912,500.00 34,912,500.00 34,912,500.00 20/12/2017 12 weeks 100 Completed

90

Supply of 1.242Nos. 3-Seater Students Desks and benches to some newly

established Senior Secondry Schools Furni-Elect Global Across the state 24,777,900.00 24,777,900.00 24,777,900.00 20/12/2017 12 weeks 100 Completed

91

Constr of islamiyya classroom block as constituency project at Unguwar

Tama in Gwiwa Constituency Manhaf Global Nig. Ltd. Gwiwa 3,268,467.76 3,268,467.76 3,110,967.30 23/08/2017 8 weeks 100 Completed

92

Constr of islamiyya classroom block as constituency project at Cikin Gari

Arewa and Garu Cikin gari in Babura Constituency Mufabamex Concept Babura 5,551,958.00 5,551,958.00 5,551,958.00 29/12/2016 8 weeks 100 Completed

93

Constr. Of Islamiyya Classroom Blocks as Contituency Project at Yamidi in

Auyo Constituency A.U.A & SONS NIG LTD Auyo 3,280,666.90 3,280,666.90 3,134,726.70 23/08/2017 4 Weeks 100 Completed

94

Constr. Of Islamiyya Classroom Blocks as Contituency Project at Gurfai and

Babura Tsallake in Babura Constituency MUFABAMEX CONCEPT LTD Babura 6,490,859.80 6,490,859.80 6,198,859.80 23/08/2017 5 Weeks 100 Completed

Total 1,438,526,060.65 1,451,932,794.89

Page 77: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

Government House

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT AMOUNT REVISED VA LUE OF C OM M EN C EM EN TC OM P L. STATUS REMARKS

(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

1

Purchase of 2no. 2015 Toyota Camry, 1no. 2013 Toyota

Prado and 1no. 2015 Toyota Landcruiser Al -hamsad Investment Dutse 85,847,520.00 85,847,520.00 85,847,520.00 13/04/2017 3 weeks 100 Completed

2 Purchase of 7no. Brandnew Toyota Camry (2015 model) Al -hamsad Investment Dutse 92,400,000.00 92,400,000.00 92,400,000.00 2/2/2017 3 weeks 100 Completed

3 Purchase of Fairly Used Armoured Lexus Jeep LX570 2013 Model. ZAAN MULTI TRADE Dutse 38,500,000.00 38,500,000.00 38,500,000.00 9/8/2017 2 weeks 100 Completed

4 Supply of 1no. Toyota Parado Al -hamsad Investment Dutse 31,900,000.00 31,900,000.00 31,900,000.00 10/10/2017 1 weeks 100 Completed

Total 248,647,520.00 248,647,520.00

Page 78: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

Min. of Land & Housing

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT (N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

TOTAL - -

Page 79: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

Min. of Commerce

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT AMOUNT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

1

Consultancy services for the Cons. Of Culvert

and Drainages at Hadejia, Kumsa and Furji

Market Yaqin Associate Ltd state 20,893,292.67 20,893,292.67 20,893,111.02 26/6/2014 6month 100 Completed

2

Renov/rehab of Maigatari Export Process ing

Zone (EPZ) Alpha Zeta Tech. Services Maigatari 21,482,985.00 21,482,985.00 21,482,557.61 24/11/2017 3 weeks 100 Completed

Total 42,376,277.67 42,376,277.67

Page 80: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

Dir. Of Econ. Emp.

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

1

Renovation work at National Youth Development Centre

Gwaram LGA FAR Tech Fabrication Gwaram 8,566,587.15 8,566,587.15 8,473,518.67 27/01/2017 8 weeks 100 Completed

Total 8,566,587.15 8,566,587.15

Page 81: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

Dutse Capital Development Agency

P OST C ON T R A C T P R OJEC T EVA LUA T ION

S/ N P R OJEC T EXEC UT OR LOC A T ION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS

AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %

1

Consultant on the superv ision for the Constr. of New Airport (project

Dutse (phase 1B) El-Mansur Atelier Co. Dutse 457,296,050.38 457,296,050.38 457,274,905.85 17/6/2013 12 months 100 Completed

2 Renov ation of His Ex cellency , the Deputy Gov ernor's Official Residence Edil Belmote Eng. Dutse 58,955,481.16 71,431,449.86 71,032,258.80 12/31/2015 12 w eeks 100 Completed

3 Constr. of 20no. Ultra Modern Market Stalls w ithin Dutse Metropolitain Sahal-Bin Nig. Ltd. Dutse 16,515,760.00 16,515,760.00 9,991,548.00 4/27/2016 12 w eeks 100 Completed

4

Procurement and Fixing of Furniture to Deputy Governor's

Residential complex, Dutse Connaught Internation Serv. Dutse 74,442,690.00 74,442,690.00 74,442,690.00 4/1/2017 4 weeks 100 Completed

TOTAL 607,209,981.54 619,685,950.24

Page 82: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

Cabinet Office

POST CONTRACT PROJECT EVALUATION

S/ N P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T R EVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS

A M OUN T (N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %

1 Consultancy for the Upgrading of Gov ernor's Lodge Abuja Design+ Consultant LTD Abuja 4,182,711.59 4,182,711.59 3,395,808.47 22/10/12 4 w eeks 100 Completed

2

Constr. of Daily pray er mosque at Kaigari, Safa Babba and Jamaru

Kuka in Auy o Constituency A.A. ALJAZEERA AGRO LTD Auy o 4,648,363.00 4,648,363.00 4,512,974.60 12/15/2016 6 w eeks 100 Completed

3

Constr. of Daily pray er mosque at Fulanin G/Ganta, Kaga Fulani and

Hammadi in Babura Constituency M UFABAM EX CONCEPT LTD Babura 4,767,336.90 4,767,336.90 4,628,482.43 12/15/2016 6 w eeks 100 Completed

4

Constr. of Daily pray er mosque at Aja (Doraw a w ard), Adugul and

Kany a (Kany a w ard) in Kany a Constituency Babura Local Gov t.

Area Deetech NIG. LTD Babura 4,762,601.55 4,762,601.55 4,623,885.00 12/15/2016 6 w eeks 100 Completed

5

Constr. of Daily pray er mosque at Gallu, Tsamiy ar Ilu, and Walaw al

in Kazaure Constituency Deetech NIG. LTD Kazaure 4,762,601.55 4,762,601.55 4,623,885.00 12/15/2016 6 w eeks 100 Completed

6

Constr. of Daily pray er mosque at Birnin Kudu Gari, Gangare and

Ukadale in Birnin Kudu Constituency NUSHE BUSINESS REC. LTD B/Kudu 4,515,216.00 4,515,216.00 4,405,334.85 12/15/2016 6 w eeks 100 Completed

7

Constr. of Daily pray er mosque at B/Gida Nahuce, Sara and Budinga

in Gw aram Constituency NUSHE BUSINESS REC. LTD Gw aram 4,707,981.00 4,707,981.00 4,593,406.39 12/15/2016 6 w eeks 100 Completed

8

Constr. of Daily pray er mosque at Kumdum, Rabadi and Galambi in

Fagam Constituency Gw aram LGA RAM ADAN CONSTR. LTD Gw aram 4,682,437.00 4,682,437.00 3,030,704.14 12/15/2016 6 w eeks 100 Completed

9

Constr. of Daily pray er mosque at Z/Kay a, Tsubut and Guntai in

Gw iw a Constituency ISA HALILU NIG. LTD. Gw iw a 4,749,281.07 4,749,281.07 4,611,265.97 12/15/2016 6 w eeks 100 Completed

10

Constr. of Daily pray er mosque at Garin Urema and Hadejia Cikin

Gari in Hadejia Constituency A.A. M AIKATAKO GEN. ENTP. Hadejia 4,335,919.41 4,335,919.41 4,209,630.48 12/15/2016 6 w eeks 100 Completed

11

Constr. of Daily pray er mosque at Kiri-Kasamma Gari, Tasheguw a

and Matafari in Kiri-Kasamma Constituency ALH. UM ARU BABANDOKI K/Kasamma 4,749,185.55 4,749,185.55 4,749,185.56 12/15/2016 6 w eeks 100 Completed

12

Constr. of Daily pray er mosque at Auroi, Kocoro and Dadada in

Bulangu Constituency K/Hausa LGA KAWU NIG. LTD. K/Hausa 4,722,180.75 4,722,180.75 4,584,641.50 12/15/2016 6 w eeks 100 Completed

13

Constr. of Daily pray er mosque at Kachakama, Maw adaci and Bura

Musa in Malam Madori Constituency AZZIDS NIG. ENTP. Malam Madori 4,937,867.34 4,937,867.34 4,794,045.95 12/15/2016 6 w eeks 100 Completed

14

Constr. of Daily pray er mosque at Katirje (L/kudu), K/Ug. Labiru

(Buji) and Azanaba in Buji Constituency LOYALTY PROPERTIES Buji 4,728,500.19 4,728,500.19 4,590,776.92 15/12/2016 6 w eeks 100 Completed

15

Constr. of Daily pray er mosque at g/Duka, Jarkuka and M/kara

Gadaw a in Jahun Constituency LOYALTY PROPERTIES Jahun 4,728,500.25 4,728,500.25 4,590,776.92 15/12/2016 6 w eeks 100 Completed

BAL. C/F 69,980,683.15 69,980,683.15

Page 83: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

Min. of Information

P OST C ON T R A C T P R OJEC T EVA LUA T ION

S/ N P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T A M OUN T R EVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS

(N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %

1 Upgrade of Dutse Stadium Lodgiani Nigeria Ltd. Dutse 351,853,465.25 524,794,441.42 524,815,740.24 25/06/2012 6 months 100 Completed

2 Consultancy Serv ices for TV station project (equipment) Royal Telecom Ltd. Dutse 92,313,015.08 92,313,015.08 92,313,015.00 12/12/2012 7 months 100 Completed

3 Upgrading of kazaure Stadium H & M Nig. Ltd. Kazaure 391,139,151.00 519,645,968.67 507,101,206.66 6/21/2012 6 months 100 Completed

Total 835,305,631.33 1,136,753,425.17

Page 84: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

Min. of Agriculture

P OST C ON T R A C T P R OJEC T EVA LUA T ION

S/ N P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T A M OUN T REVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS

(N ) CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %

1 Consultancy on 50No. Windmills Abasam Nig. Ltd. in the state 15,000,000.00 15,000,000.00 15,000,000.00 Nov . 2012 7 months 100 Completed

2

Prov ision of additional 30no. Wind pow ered Liv estock Watering

facilities at 30no. Grazing Reserv es

Ex cel Standards Nig.

Ltd. State 350,487,264.60 350,487,264.60 350,421,666.48 19/5/2014 6 months 100 Completed

TOTAL 365,487,264.60 365,487,264.60

Page 85: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

Min. of Women Affairs

POST CONTRACT PROJECT EVALUATION

S/ N P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T R EVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS

A M OUN T (N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %

1 Purchase of Grains (Maize) (1000 mts) Juraj Gen. Entp. State 145,480,000.00 145,480,000.00 3/3/2017 4 weeks 100 Completed

2 Purchase of Grains (Maize) (650 MTS) Juraj Gen. Entp. State 99,162,000.00 99,162,000.00 31/5/2017 4 weeks 100 Completed

3 Renov. of Dutse Women Multi-purpose centre Umar Aliyu & Sons Ltd. Dutse 11,428,016.84 11,428,016.84 11,326,476.18 19/10/2017 8 weeks 100 Completed

Total 256,070,016.84 256,070,016.84

Page 86: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

Head of Service

S/ N . P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T R EVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS

A M OUN T C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %

1

Constr. of Guest Facilities at Manpow er

Dev elopment Institute, Dutse Babandoki Gen. Entp. Dutse 650,250,473.88 659,803,983.88 659,115,599.88 12/10/2014 18 months 100 Completed

2

Commissioning/Engagement as Consultant for

the Superv ision of the Constr. of Guest

Facilities at Manpow er Dev elopment Institute,

Dutse Design Plus + Dutse 35,907,501.07 35,907,501.07 35,907,501.07 12/10/2014 18 months 100 Completed

3

Supply and Installation of Furniture and

Electronics for the New Guest's Facilities

at MDI Dutse Babandoki Gen. Entp. Dutse ############## 246,220,380.00 246,093,960.00 21/6/2017 12 weeks 100 Completed

,

TOTAL 932,378,354.95 941,931,864.95

Page 87: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

Science & Tech.

P OST C ON T R A C T P R OJEC T EVA LUA T ION

S/ N . P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T R EVISED VA LUE OF C OM M EN C EM EN TC OM P L.ST A T US R EM A R KS

A M OUN T (N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %

Total - -

Page 88: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

State Universal Basic Education Board

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENTC OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

1

Constr of Dining Hall at bamaina

Academy BM Investment Ltd. B/kudu 14,754,828.72 14,754,828.72 13,655,465.79 15/4/2015 16 weeks 100 Completed

Total 14,754,828.72 14,754,828.72

Page 89: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

Jigawa State Independent Electoral Commission

POST CONTRACT PROJECT EVALUATION

S/ N P R OJEC T EXEC UT OR LOC A T IONC ON T R A C T A M OUN T R EVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS

(N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %

Total - -

Page 90: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

Min. of Justice

POST CONTRACT PROJECT EVALUATION

S/ N P R OJEC T EXEC UT OR LOC A T IONC ON T R A C T A M OUN T R EVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS

(N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %

Total - -

Page 91: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

GH

POST CONTRACT PROJECT EVALUATION

S/ N P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T R EVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS

A M OUN T (N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %

Total - -

Page 92: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

Agency for Nomadic Edu.

P OST C ON T R A C T P R OJEC T EVA LUA T ION

S/ N P R OJEC T EXEC UT OR LOC A T IONC ON T R A C T A M OUN T REVISED VA LUE OF C OM M EN C EM EN TC OM P L.ST A T US R EM A R KS

(N ) CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %

Total - -

Page 93: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

Jigawa College of Edu. & Legal Studies

P OST C ON T R A C T P R OJEC T EVA LUA T ION

S/ N . P R OJEC T EXEC UT OR LOC A T ION CONTRACT REVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS

AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %

Total - -

Page 94: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

Bilyaminu Usman Poly Hadejia

P OST C ON T R A C T P R OJEC T EVA LUA T ION

S/ N P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T A M OUN T REVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS

(N ) CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %

1

Procurement of Facilities, Equipment, Office Funiture

and Rehab. of Proposed Business Admin. Block for

NBTE Resources inspection at Biny aminu Usman

Poly technic, Hadejia. DAD A.E. Nig. Limited Hadejia 55,803,000.00 55,803,000.00 54,799,849.96 30/12/2016 24 w eeks 100 Completed

2

Procurement of 1no. 30kva sound proof

generator Al-kasam janna Nig. Ltd. Hadejia 5,250,000.00 5,250,000.00 5,250,000.00 15/5/2017 2 weeks 100 Completed

3Prov ision of Wi-fi & VSAT Galax y Information Ltd. Hadejia 1,723,885.00 1,723,885.00 1,723,885.00 25/8/17 4 w eeks 100 Completed

4

Renov of Hostel blocks J&H and 2no. Toilet blocks AMIM Constr. Ltd. Hadejia 7,758,515.72 7,758,515.72 7,389,032.95 18/12/2017 8 w eeks 100

Completed

5Procurement of Library blocks Muhal Global Concept Hadejia 15,107,100.00 15,107,100.00 15,107,100.00 25/8/2017 8 w eeks 100

Completed

6Supply and Installation of Laboratory furnitures Muhal Global Concept Hadejia 13,768,125.00 13,768,125.00 13,768,125.00 24/07/2017 8 w eeks 100

Completed

TOTAL 99,410,625.72 99,410,625.72

Page 95: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

Min. of Environment

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

1 Constr. of Drainage at Limaw a tow n, Dutse Deetech Nig. Ltd. Dutse 13,745,000.00 13,745,000.00 13,721,289.59 8/10/2017 10 w eeks 100 Completed

2 Constr. of Drainage at Makara Duhu in Hadejia Tasiu Model Inv est. Ltd. Hadejia 17,083,086.46 17,083,086.46 16,269,606.15 8/9/2017 12 w eeks

100

Completed

Total 30,828,086.46 30,828,086.46

Page 96: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

Jigawa State College of Edu. Hadejia

P OST C ON T R A C T P R OJEC T EVA LUA T ION

S/ N . P R OJEC T EXEC UT OR LOC A T ION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K (N ) D A T E P ER IOD IN %

1

Supply of (600 pieces) of Mattress Mabudi Constr. Co. Ltd. Gumel 8,505,000.00 8,505,000.00 8,505,000.00 21/12/2017 1 w eek 100 Completed

2

Constr of w all fence Mabudi Constr. Co. Ltd. Gumel 11,962,308.07 11,962,308.07 11,392,673.60 27/11/2017 4 w eeks 100 Completed

Total 20,467,308.07 20,467,308.07

Page 97: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

Jigawa State Institute of Info. Tech. Kazaure

P OST C ON T R A C T P R OJEC T EVA LUA T ION

S/ N . P R OJEC T EXEC UT OR LOC A T ION CONTRACT REVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS

AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %

TOTAL - -

Page 98: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

SECTION ( F )

ON-GOING PROJECTS

JANUARY TO DECEMBER, 2017

Page 99: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

Min of Health

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

1 Constr. of New Gen. Hospital at B/Kudu Datum Constr. Limited B/kudu 1,498,970,413.02 1,498,970,413.02 777,191,933.28 19/5/2014 8 months 52 On-going

2 Cleaning Serv ices at School of Nursing B/kudu Basic Four Ltd. B/kudu 16,140,000.00 16,140,000.00 12,105,000.00 1/1/2014 56 w eeks 75 On-going

3

Commissioning/engagement as consultants for the

superv ision of construction of new general hospital at

Birnin kudu Design Plus B/Kudu 74,010,950.99 74,010,950.99 56,302,674.54 27/5/2014 10 month 72 On-going

4 Constr. Of BHC of Dannani in Gagarawa Dangata Invest. Ltd. Gagarawa 19,500,000.00 19,500,000.00 18,584,611.50 5/6/2017 16 weeks 95 On-going

5 Prov ision of Security Serv ices at College of Nursing and Kings Guard Nig. Ltd Birnin Kudu 7,399,080.00 7,399,080.00 2/1/2017 12month On-going

6

Renov ation of X-Ray Block and Others at Hadejia

General Hospital

Spring Global Serv ice Hadejia 10,771,117.36 10,771,117.36 4,502,571.15 4/2/2014 2month 43 Terminated

7

Conversion of Catering Rest House to School of

Nursing, Hadejia Business Gold Ltd. Hadejia 67,757,628.62 67,757,628.62 38,524,250.94 3/22/2016 3 months 57 Rev oked

8

Renovation/Improvement works at Babura

General Hospital Babandoki Gen. Entp. Babura 86,705,087.43 86,705,087.43 71,349,004.60 9/9/2016 20 weeks 78 On-going

9

General Renov ation/Improv ement w orks at Dutse

General Hospital Ummu Khulsum Global Dutse 56,668,862.45 56,668,862.45 34,049,192.92 30/12/2016 16 w eeks 60 On-going

10

General Renov ation/Improv ement w orks at Jahun

General Hospital Yanduna Ventures Jahun 62,314,663.17 75,593,349.17

42,115,621.08

30/12/2016 16 w eeks

65

On-going

11

General Renov . /Improv ement w orks at Fagam Primary

Health Care Ngaloma Const. Co. Ltd. Gw aram 64,869,057.07 71,417,939.66 51,621,542.48 30/12/2016 12 w eeks 69 On-going

12

General Renov . /Improv ement w orks at Taura Primary

Health Care Babandoki Gen. Entp. Ltd. Taura 66,748,706.88 75,219,035.87 62,827,942.80 30/12/2016 12 w eeks 66 On-going

13

Supply of Furniture to New School of Nursing,

Hadejia Wajabs Building & Constr. Hadejia 47,076,618.00 47,076,618.00 40,848,696.00 7/2/2017 12 weeks 87 On-going

14

Construction of prototype basic health clinic (BHC)

across the state as constituency project at Garin

Chiroma in Gagarawa consitituency. HARUNA LADAN INVEST. Gagarawa 19,285,412.31 19,285,412.31 18,367,059.34 30/5/2017 16 weeks 95 On-going

15

Construction of prototype basic health clinic (BHC)

across the state as constituency project at

Auyakayi in Auyo consitituency. BABAN DOKI GEN. ENTP. Auyo 19,576,947.50 19,576,947.50 18,304,317.15 30/5/2017 16 weeks 95 On-going

16

Construction of prototype basic health clinic (BHC)

across the state as constituency project at

Gangara in Gumel consitituency. POLYSPEC NIG. LTD. Gumel 19,100,000.00 19,100,000.00 18,190,476.19 30/5/2017 16 weeks 95 On-going

Balance C/F 2,136,894,544.80 2,165,192,442.38

Page 100: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 2,136,894,544.80 2,165,192,442.38

17

Construction of prototype basic health clinic (BHC)

across the state as constituency project at

Maraganta in Gwiwa consitituency. NGALOMA CONSTR. CO. Gwiwa 19,253,751.00 19,253,751.00 18,378,580.50 30/5/2017 16 weeks 95 On-going

18

Constr. Of Prototype basic Health Clinic (BHC)

Across the State as Constituency Project at Buduru

in Garki Local Government Area. (change of site) A.H.I.K ENT LTD Garki 19,304,132.10 19,304,132.10 18,426,694.65 21/08/2017 16 Weeks 95 On-going

19

Construction of prototype basic health clinic (BHC)

across the state as constituency project at

Ba'auzini in Kazaure consitituency. BABAN DOKI GEN. ENTP. Kazaure 19,276,132.05 19,276,132.05 18,358,221.00 30/5/2017 16 weeks 95 On-going

20

Construction of prototype basic health clinic (BHC)

across the state as constituency project at Fake in

Kiyawa consitituency. BABAN DOKI GEN. ENTP. Kiyawa 19,576,947.50 19,576,947.50 18,687,086.25 30/5/2017 16 weeks 95 On-going

21

Construction of prototype basic health clinic (BHC)

across the state as constituency project at

Dansure in Roni consitituency. DANGATA MEMORIAL Roni 19,335,533.23 19,335,533.23 18,456,645.36 30/5/2017 16 weeks 95 On-going

22

Construction of prototype basic health clinic (BHC)

across the state as constituency project at Taka

tsaba in Suletankarkar consitituency. POLYSPEC NIG. LTD. S/Tankarkar 19,675,403.00 19,675,403.00 18,781,066.50 30/5/2017 16 weeks 95 On-going

23

Construction of prototype basic health clinic (BHC)

across the state as constituency project at

Dankari in Yankwashi consitituency. BABAN DOKI GEN. ENTP. Yankwashi 19,490,741.50 19,490,741.50 18,604,798.80 30/5/2017 16 weeks 95 On-going

24

Construction of prototype basic health clinic (BHC)

across the state as constituency project at

Baderin gabas in Hadejia consitituency. NGALOMA CONSTR. CO. Hadejia 19,035,479.45 19,035,479.45 18,129,028.05 30/5/2017 16 weeks 95 On-going

25

Construction of prototype basic health clinic (BHC)

across the state as constituency project at Giginya

in Babura consitituency. POLYSPEC NIG. LTD. Babura 19,312,904.52 19,312,904.52 18,349,359.00 30/5/2017 16 weeks 95 On-going

Balance C/F 2,311,155,569.15 2,339,453,466.73

1b

Page 101: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 2,311,155,569.15 2,339,453,466.73

26

Constr. Of Prototype basic Health Clinic (BHC)

Across the State as Constituency Project at

Gasakoli in Babura Local Government Area.

(change of site) BABANDOKI GEN ENT Babura 19,225,138.00 19,225,138.00 18,376,851.30 17/08/2017 16 Weeks 95 On-going

27

Construction of prototype basic health clinic (BHC)

across the state as constituency project at Sabon

garin yaya in Taura consitituency. A.H.I.K. ENTP. LTD. Taura 19,394,831.50 19,394,831.50 18,513,248.25 30/5/2017 16 weeks 95 On-going

28

Construction of prototype basic health clinic (BHC)

across the state as constituency project at Surko

in Birnin kudu consitituency. A.H.I.K. ENTP. LTD. B/Kudu 19,575,646.20 19,575,646.20 18,628,571.43 30/5/2017 16 weeks 95 On-going

29

Construction of prototype basic health clinic (BHC)

across the state as constituency project at Ruba in

Kafin hausa consitituency. S.U.B. GEN VENTURES K/Hausa 19,523,847.00 19,523,847.00 18,584,611.50 30/5/2017 16 weeks 95 On-going

30

Construction of prototype basic health clinic (BHC)

across the state as constituency project at Jarmari

in Kirikasamma consitituency. A.A MAIKATAKO K/Kassamma 19,723,317.08 19,723,317.08 18,782,851.50 30/5/2017 16 weeks 95 On-going

31

Construction of prototype basic health clinic (BHC)

across the state as constituency project at Dawa

in Guri consitituency. S.U.B. GEN VENTURES Guri 19,253,751.00 19,253,751.00 18,376,581.30 30/5/2017 16 weeks 95 On-going

32

Construction of prototype basic health clinic (BHC)

across the state as constituency project at Karwai

in Ringim consitituency. IMAM AHMAD NIG Ringim 19,666,797.24 19,666,797.24 18,595,170.85 30/5/2017 16 weeks 95 On-going

33

Construction of prototype basic health clinic (BHC)

across the state as constituency project at Mudiga

in Miga consitituency. A.H.I.K. ENTP. LTD. Miga 19,329,482.25 19,329,482.25 18,409,030.50 30/5/2017 16 weeks 95 On-going

Balance C/F 2,466,848,379.42 2,495,146,277.00

Page 102: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 2,466,848,379.42 2,495,146,277.00

34

Construction of prototype basic health clinic (BHC)

across the state as constituency project at

Dinfiduwa in Malam Madori consitituency. A.G.GLOBAL GOLD M/madori 19,693,479.20 19,693,479.20 18,798,320.10 30/5/2017 16 weeks 95 On-going

35

Construction of prototype basic health clinic (BHC)

across the state as constituency project at Dan

kumbo in Maigatari consitituency. IMAM AHMAD NIG Maigatari 19,723,317.08 19,723,317.08 16,739,928.78 30/5/2017 16 weeks 81 On-going

36

Construction of prototype basic health clinic (BHC)

across the state as constituency project at

Idanduna in Jahun consitituency. IMAM AHMAD NIG Jahun 19,532,487.00 19,532,487.00 18,458,200.21 30/5/2017 16 weeks 95 On-going

37

Constr. Of New 250 Bed Specialist Hospital in

Hadejia PHILKO LIMITED Hadejia 1,593,314,294.25 1,593,314,294.25 11/8/2017 16 months 5 On-going

38

Renovation Works at New School of Nursing

Hadejia XTRAX 99 INT SERV LTD Hadejia 58,681,266.23 58,681,266.23 21,552,121.18 6/9/2017 12 weeks 37 On-going

39

General Renov./Improvement works at Roni

Primary Health Centre (PHC) Yusmatech Invest. Nig. Ltd. Roni 26,766,366.36 26,766,366.36 13,858,953.13 2/11/2017 12 Weeks 52 On-going

40

General Renov./Improvement works at Kanya

Babba Primary Health Centre (PHC) Math Global Invest. Ltd. Babura 27,609,456.17 27,609,456.17 15,110,173.95 2/11/2017 12 Weeks 55 On-going

41

General Renov./Improvement works at Kaugama

Primary Health Centre (PHC) S/garin Yaya Nig. Ltd. Kaugama 35,574,703.10 35,574,703.10 15,919,674.25 2/11/2017 12 Weeks 45 On-going

42

Supply and Installation of Solar Powered

Lightening System at Dutse Gen. Hospital SIMS Global Resources Dutse 27,835,303.13 27,835,303.13 17,105,387.25 2/11/2017 8 Weeks 61 On-going

43

Construction of Wall Fence, Gate and House at

Specialist Hospital Kazaure Ngaloma Constr Com Kazaure 57,329,839.50 57,329,839.50 21/12/2017 8 Weeks 5 On-going

44

Supply and installation of Solar Powered lightening

System in Babura General Hospital. Sims Global Resources Babura 20,984,971.88 20,984,971.88 20/12/2017 8 Weeks Just mobilized

Balance C/F 4,373,893,863.32 4,402,191,760.90

Page 103: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Balance B/F 4,373,893,863.32 4,402,191,760.90

45

Supply and installation of Solar Powered lightening

System in GumelGeneral Hospital. Sims Global Resources Gumel 30,263,168.13 30,263,168.13 20/12/2017 8 weeks Just mobilized

46

Engagment as Consultant for the supervision of the

Constr. Of New Specialist Hospital, Hadejia HAG Eng. Nig. Ltd. Hadejia 19/10/2017 16 months 5 On-going

47 Completion of wall fencing of Ringim Gen. Hospital DasoMaryam Nig. Ltd. Ringim 7,599,406.45 7,599,406.45 4,862,347.95 16/12/17 8 Weeks 64 On-going

Total 4,411,756,437.90 4,440,054,335.48

Page 104: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

Min. of Water Resources

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

1

Rehab. of Water Supply Schemes across the state at

Hadejia Zone (Water Board) Seltrix Nig. Ltd. Hadejia 76,214,488.22 76,214,488.22 52,868,287.50 9/21/2015 12 w eeks 66 On-going

2

Rehab. of Water Supply Schemes across the state at

Gw aram Zone (Water Board) Interw orld I & E Gw aram 27,207,315.85 27,207,315.85 22,983,670.63 9/21/2015 12 w eeks 89 On-going

3 Constr. Of 40no. Hand pumps AGM & Sons Ltd. State 28,000,000.00 28,000,000.00 18,000,009.00 3/24/2014 6 months 65 On-going

4

Conversion of Motorised Diesel powered water

schemes to Solar energy powered schemes

across the state at Idanduna, Koya, Sabon gida

and Dakayyawa stations in Jahun zone (STOWA) IMAM Ahmed Nig. Ltd. Jahun 16,237,593.74 16,237,593.74 2,379,234.37 4/29/2016 12 w eeks 15 On-going

5

Conversion of Motorised Diesel powered water

schemes to Solar energy powered schemes

across the state at Kudigin, Nguwa, Likori, Musari

and Makaddari stations in Hadejia zone (STOWA) ABAT Global Inv est. Hadejia 12,877,265.61 12,877,265.61 10,498,031.25 4/29/2016 12 w eeks 82 On-going

6

Conv.of Motorised Diesel powered water schemes to

Solar powered schemes across the state at Gumel,

Maigatari and S/Tankarkar stations in Gumel zone

(Water Board) JURAJ Gen. Entp. Ltd. Gumel 16,707,009.38 16,707,009.38 11,821,687.50 5/18/2016 8 weeks 70 On-going

7 Improvement of Kazaure town Water Supply Marb Eng. & Multy Serv ices Kazaure 131,208,239.13 163,939,534.76 126,042,350.53 7/28/2016 7 weeks 73 On-going

8 Improvement of Ringim town water supply Marb Eng. & Multy Serv ices Ringim 137,576,766.21 213,146,514.63 210,012,062.11 11/23/2016 20 weeks 98 On-going

9

Constr. of Hand pumps Water Supply Schemes as

Constituency Projects at Gajigani, Gaw ajo, Kankare,

Fulanin G/Lamau And Gaban Giw a in Gagaraw a

Constituency DANM AWANKI NIG. LTD Gagaraw a 2,780,000.00 2,780,000.00 11/29/2016 8 w eeks - Just mobilized

10 Improvement of Babura town Water Supply Schemes Prestige Interg. Services Babura 119,811,906.43 221,351,161.88 218,640,250.74 29/12/2016 16 weeks 98 On-going

11 Improvement of Gumel town Water Supply Schemes M ARB Eng. & M ulty Gumel 179,054,167.87 274,990,289.75 255,796,087.26 29/12/2016 20 weeks 93 On-going

12

Constr. o f Hand Pumps Water Supply Schemes as

Constituency Pro jects at Banbare Gidan Sallau, Ka'el

village, Gumumuwa, Gizo Babba and Kabobi village in

Kazaure Constituency. M arb Eng. & M ulty Serv. Kazaure 2,769,900.00 2,769,900.00 7/3/2017 8 weeks Just mobilized

13

Constr. o f Hand Pumps Water Supply Schemes (phase

II) as Constituency pro jects at Yosaro, Dilima/Zaramba

and M ungulo in B/Kudu Constituency. A.A. A ljazeera Agro Properties B/Kudu 1,657,215.00 1,657,215.00 29/3/2017 8 weeks Just mobilized

BAL. C/F 752,101,867.44 1,057,878,288.82

Page 105: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 752,101,867.44 1,057,878,288.82

14

Constsruction of Hand pumps Water supply

schemes (phase II) as constituency project at

Yola, Masanawa, Larabar Gulai, Katanga Kudu,

Dan koli and Dubal in Kiyawa Constituency. DE-MASTBO Kiyawa 3,331,430.00 3,331,430.00 29/03/2017 8 weeks Just mobilized

15

Construction of Solar Powered Water supply

schemes (Phase II) as constituency Projects at

Sabuwar Rafa (Andaza ward ) in Dutse

constituency DE-MASTBO Dutse 6,270,000.00 6,270,000.00 29/03/2017 8 weeks Just mobilized

16

Cost Variation/Fluctuation on the improvement

of Gumel Town Water supply MARB ENGR SVC LTD Gumel 33,651,870.00 33,651,870.00 6/6/2017 On-going

17

Constr. Of 4no. Hand pumps Water supply

schemes (phase II) as Constituency projects at

Kofar Gidan Liman, Bayan Gidan Sarkin Bai,

Zankuwa fulani and Sabuwar SSS in Garki

Constituency. Taqib Ventures Nig. Ltd. Garki 2,340,000.00 2,340,000.00 21/6/2017 8 weeks Just mobilized

18

Constr. Of Hand Pumps Water Supply Schemes

as Constituency Projects at Falkin Jalo

Nasarawa, Fulanin Kuka Uku, Fulanin Liman

Mado, Fulanin Gangara and Fulanin Dan'ama

Gabas in Gumel Constituency. JAG & H Int. Services Gumel 2,742,600.00 2,742,600.00 1,641,446.10 29/8/2017 8 weeks 57 On-going

19

Constr. Of Solar Powered Water Supply Schemes

(Phase I) as Constituency Project at Marye in

Birniwa Constituency ADZ GLOBAL SERV LTD Birniwa 6,968,010.00 6,968,010.00 7/8/2017 8 Weeks just mobilized

20

Constr. Of Solar Powered Water Supply Schemes

(Phase I) as Constituency Project at Baturiya and

Tarabu in Kirikasamma Constituency ADZ GLOBAL SERV LTD K/Kasamma 13,936,020.00 13,936,020.00 7/8/2017 8 Weeks just mobilized

21

Constr. Of Solar Powered Water Supply Schemes

(Phase I) as Constituency Project at Bekarya and

Gusau in Gumel Constituency JAG & H INT SERVICES Gumel 13,921,740.00 13,921,740.00 7/8/2017 8 Weeks just mobilized

22

Constr. Of Solar Powered Water Supply Schemes

(Phase I) as Constituency Project at Kabara,

Bagaware and Kandawa Bura in Maigatari

Constituency A.U SARO GLOBAL RES Maigatari 20,882,610.00 20,882,610.00 7/8/2017 8 Weeks just mobilized

23

Constr. Of Solar Powered Water Supply Schemes

(Phase I) as Constituency Project at Marma in

Kirikasamma Constituency LOYALTY PROPERTIES LTD K/Kasamma 6,943,387.00 6,943,387.00 7/8/2017 8 Weeks just mobilized

24

Constr. Of HandPump Water Supply Scheme

(Phase I-2017) as Constituency Project at

Kwarare kauye ( Yola Ward) and Rorau Fulani (

Rorau Ward) in Gwiwa Constituency THAQIB VENT NIG LTD Gwiwa 1,600,200.00 1,600,200.00 28/8/2017 8 Weeks just mobilized

BAL. C/F 864,689,734.44 1,170,466,155.82

Page 106: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 864,689,734.44 1,170,466,155.82

25

Constr. Of Hand Pumps Supply Schemes (Phase I-

2017) as Constituency Project at Kofar Gabas

Gwaram, Barebari Makabarta Sabuwa,

Auyakawa Gidan Dutse Gwaram, Tambo

Gwaram and Sumangara in Gwaram

Constituency AZZIDS NIG LTD Gwaram 7,076,160.00 7,076,160.00 28/8/2017 8 Weeks just mobilized

26

Constr. Of Handpumps Water Supply Schemes

(Phase I-2017) as Constituency Project at Tsaba,

Dabi, Badage Gabas, Tagwani, Jana, Danlare,

Alhaji Kayi and Sabuwar Amaguwa in Ringim

Constituency MARB ENG & MULTI SERV Ringim 8,001,000.00 8,001,000.00 28/8/2017 8 Weeks just mobilized

27

Constr. Of Water Collection Points (Phase I-

2017) as Constituency Project at Garoro, Batali

and Majiya Bakin Hanya in Taura Constituency NUSHE BUSINESS RES Taura 2,401,717.50 2,401,717.50 28/8/2017 8 Weeks just mobilized

28

Constr. Of HandPumps Water Supply Schemes

(Phase I-2017) as Constituency Project at

Chiroma, Kupsa Sabuwa Ujiwa, Rigar Mungurum,

Tudu Birniwa and Dambin Diginsa in Birniwa

Constituency MUSFAT GEN ENV Birniwa 4,607,190.00 4,607,190.00 7/9/2017 8 Weeks just mobilized

29

Constr. Of 17NO. HandPumps Water Supply Schemes

(Phase III-2016) as Constituency Project at Tsakatai

Fulani( Budur Ward) Dakace(Doko Ward) Koguran

Sabuwa ( Doko Ward), Kofar Gidan Liman ( Garki Ward)

Bayan Gdian Sarkin Bai (Garki Ward), Zankuwa Fulani

(Garki Ward), Sabuwar Senior Secondary School (Garki

Ward), Zaidawa (Gwarzo Ward), Kurgunguma ( Gwarzo

Ward), Gidan Gone (Siyori Ward) Wailari( Jirima Ward)

Ufala Fulani (Rafin M arke Ward) Hardon Nagona

Faggen Gawo( Kore Ward) Gidan Boza (kore Ward)

Abudawa (M uku Ward), Unguwar Shage (Kanya Ward)

and Wailari (Jirima Ward) in Garki Constituency THAQIB VENT NIG LTD Garki 9,945,000.00 9,945,000.00 24/08/2017 8 Weeks just mobilized

BAL. C/F 896,720,801.94 1,202,497,223.32

Page 107: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 896,720,801.94 1,202,497,223.32

30

Constr. Of HandPumps Water Supply Schemes (Phase

I-2017) as Constituency Proeject at G/ M utari A li Hardo

Amad M acce, Amanga Gari, Gidan Kwajale, Hardo

Chiroma, G/Jafan Sa'idu Hardo, Yantuba, Unguwar

Babangida D/Danra, G/M usa Shanu Hardo, Gidan

Wakili Isah Hardo M atto, Dankwabro Near M adoji,

Hardo Dambo Fulanin Babamato, Gidan Hardo Isa

Kyarra Gari in Sule-Tankarkar Constituency M ANHAF CONS NIG LTD S/tankarkar 9,435,816.00 9,435,816.00 28/08/2017 8 Weeks just mobilized

31

Upgarding and Conversion of 7No M otorized Water

Supply Schemes to Solar Powered Water Supply

Schemes at Dundubus, Kafin Gana, Danmakama,

M arma, Bulangu, Dansure and Jigawa Town. SIM S GLOBAL RESOURCE State 90,265,107.03 90,265,107.03 49,052,723.10 25/08/2017 16 weeks 54 On-going

32

Constr. Of 2no. Bore-hole and Pipeline route of Water

Supply from M atanfada pump station to (GSS) Roni in

Roni. NE Global Eng. Roni 12,400,890.80 12,400,890.80 14/9/2017 8 Weeks just mobilized

33

Constr. Of Solar Powered Water Supply Scheme

(Phase I) as Constituency Pro ject at Digawa (Danzomo

ward) in Sule T/karkar Constituency. Bulangu Drilling Services S/tankarkar 6,967,800.00 6,967,800.00 7/8/2017 8 Weeks just mobilized

34

Rehabilitation of Solar Powered Water supply

schemes across the State at Birnin kudu, Dutse,

Hadejia,Ringim, Gumel, Jahun and Kazaure zone

(Stowa) Sims Global Resources Across the state 166,689,700.28 166,689,700.28 122,858,268.75 18/12/2017 12 weeks 74 On-going

35

Construction of complete Solar Powered Water

supply scheme in Yan Maulu Town in Babura

Local Govt Area and conversion of Daba Town

Water supply scheme in Kazaure Local Govt

Area. Umar Aliyu & Sons Ltd. Kazaure 14,255,587.50 14,255,587.50 28/12/2017 8 Weeks just mobilized

36

Improvement of Taura Water supply scheme in

Taura local Govt Area Ngaloma Constr Com Taura 51,176,269.46 51,176,269.46 28/12/2017 12 weeks just mobilized

37

Construction of Solar Powered Water Supply

Schemes (PhaseI) as Constituency project at

Gargadin Giwa and Rumbiya in Birnin kudu

Constituency. Y-Tech Invst. & Agro Ltd Birnin Kudu 13,921,740.00 13,921,740.00 14/08/2017 8 Weeks just mobilized

38

Improvement of Jahun town water supply

scheme in Jahun LGA Babandoki Gen Entp. Jahun 19,822,950.00 19,822,950.00 28/12/2017 12 Weeks just mobilized

39

Improvement of Kiyawa town water supply

scheme in Kiyawa LGA Babandoki Gen Entp. Kiyawa 38,571,055.11 38,571,055.11 28/12/2017 12 Weeks just mobilized

40

Constr of Solar powered water shemes at Desina

and Layout of water supply in Dutse China Zhangho Dutse 463,368,470.36 463,368,470.36 179,652,518.32 10/10/2017 2 weeks 39 On-going

T OT A L 1,783,596,188.48 2 ,089,372,609.86

Page 108: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

Min. of Works

P OST C ON T R A C T P R OJEC T EVA LUA T ION

S/ N . P R OJEC T EXEC UT OR LOC A T ION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS

AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %

1 Constr. of Internal Road Netw ork and Drainage at College of Agriculture YamidiAmirco Univ ersal Concept Hadejia 114,852,386.25 499,296,564.31 379,082,108.24 6/10/2011 20 w eeks 76 Stalled

2

Consultancy serv ices for the Constr. of Limaw a-Warw ade-Jidaw a-

Sakw ay a-Dutse road KAP Civ il Eng. Consultants Dutse 57,547,589.11 57,547,589.11 51,132,963.56 11/15/2012 16 months 94 On-going

3 Urban Tow ns Streetlight projects in B/kudu tow n (phase II) Stratrade Nig. Ltd. B/kudu 220,682,574.00 346,239,918.06 281,871,366.58 14/9/2012 7 months 81 On-going

4 Constr. of Limaw a-Warw ade-Jidaw a-Sakw ay a-Dutse road (33.40km) Boroni Prono & Co. Ltd. Dutse 2,968,551,896.02 2,968,551,896.02 2,611,339,802.95 2/11/2012 14 months 88 On-going

5 Reconstr. Of Asphaltic concrete ov erlay of Kijaw al-Dabi road (4.5km) Triacta Nig. Ltd. Taura 453,412,679.27 526,840,847.35 318,255,144.90 18/3/2013 3 months 70 Stalled

6 Urban Tow ns Streetlight Projects at Karkarna Tow n Stratrade Nig. LTD Yankw ashi 234,338,917.73 234,338,917.73 163,695,161.17 11/11/2013 6 Months 70 On-going

7

Commissioning as Consultant on the superv ision of the Urban Tow n

Streetlight Project at Garki, Karkarna, Bamaina and 3no. Gen. Hosp. MBS Eng. Nig. Ltd. Garki 29,431,500.00 29,431,500.00 27,371,295.00 23/4/2014 93 stalled

8

Commissioning as Consultant for the Superv ision of the Constr. of Gumel-

G/Gambo, feeder roads, M/madori-Dakido, Shafar-G/sani OPIQ Consultant LTD. Gumel 16,024,856.75 16,024,856.75 11,662,644.84 3/3/2014 6month 68 On-going

9 Constr. of feeder road at gumel-Garin Gambo in Gumel L.G.A. Omega Stars Nig. Ltd. Gumel 149,763,131.44 149,763,131.44 57,038,525.00 13/02/2014 6 months 38 On-going

10 Consulltancy serv ices for the Constr. Of Kiy ako-Zarenaw a feeder road UKM Civ il Eng. Consultant Babura 16,187,482.45 16,187,482.45 11,636,138.15 2/2/2014 8 months 65 On-going

11 Consultancy serv ices for the constr. Of T/kance-jamus feeder road UKM Civ il Eng. Consultant Babura 21,657,808.87 21,657,808.87 - 2/8/2014 8 Months 60 On-going

12

Commisioning as consultant on the superv ision of the construction of 6No.

New feeder road projects across the state OPIQ Consultant Ringim 22,400,354.68 22,600,354.68 21,242,736.09 28/5/2014 8 months 95 On-going

13 Consultancy Superv ision for the Constr. of Gw iw a tow nship roads (4.0km) Sadiq Eng. Serv ices Gw iw a 34,489,165.99 34,489,165.99 31,495,251.31 12/17/2012 6 months 95 Stalled

14

Commissioning as consultant for the superv ision of Kazaure urban centre

(15KM) Wuro Associate Kazaure 92,141,988.97 92,141,988.97 46,958,833.21 5/9/2013 8 months 50 On-going

15 Construction of Tow nship at kaugama Urban Centre (6.30KM) Rocad Contr. LTD Kaugama 940,127,208.47 940,127,208.47 263,578,988.93 13/12/2013 8 Months 28 Rev oked

16 Constr. of Tow nship Roads at Hadejia Urban Centre (12.80KM) Paache Const. Nig. LTD Hadejia 2,507,773,876.62 2,685,622,244.94 928,449,154.66 12/31/2013 12 months 35 On-going

17 Constr. of Tow nship Roads at Maigatari Urban Centre (6.95KM) H&M Nig. LTD Maigatari 1,037,700,121.50 1,037,700,121.50 660,531,165.00 17/12/2013 8 Months 63 On-going

18 Constr. of Tow nship Roads at Guri Urban Centre (6.15KM) SKY Tech.& Contr.LTD Guri 1,362,774,826.33 1,362,774,826.33 627,899,030.68 17/12/2013 8 Months 46 On-going

19

Commissioning as Consultant on the Superv ision of the Constr. of Maigatari

Tow nship Road (6.95KM) Sadiq Eng Ser. LTD Maigatari 64,472,315.43 64,472,315.43 57,300,722.05 19/12/2013 8 Months 89 On-going

20

Commissioning as Consultant on the Superv ision of the Constr. of M/Madori

tow nship Road (6.40KM) U.K.M Civ il Eng. LTD M/madori 59,544,758.06 59,544,758.06 31,791,306.24 12/31/2013 8 Months 52 On-going

21

Commissioning as Consultant on the Constr. Of Roni tow nship roads

(5.00KM) EMACS Eng. Consultants Roni 61,195,703.35 61,195,703.35 37,360,484.41 12/31/2013 8 Months 61 On-going

Balance C/F 10,465,071,141.29 11,226,549,199.81

Page 109: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

P OST C ON T R A C T P R OJEC T EVA LUA T ION

S/ N . P R OJEC T EXEC UT OR LOC A T ION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS

AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %

Balance B/F 10,465,071,141.29 11,226,549,199.81

22 Commissioning as Consultant for the Constr. of Hadejia Tow nship roads Global Ecological Hadejia 101,482,637.11 101,482,637.11 73,140,829.65 12/31/2013 16 months 72 On-going

23

Commissioning as Consultant for the Constr. of Sule Tankarkar Tow nship

roads Thamar Eng. Ltd. S/tankarkar 64,638,503.00 64,638,503.00 45,203,717.27 13/02/2014 12 months 69 On-going

24 Commissioning as Consultant for the Constr. of Kaugama Tow nship roads Interactiv e Consultants Kaugama 66,347,751.06 66,347,751.06 38,946,478.35 12/31/2013 12 months 58 Stalled

25 Commissioning as Consultant for the Constr. of Guri Tow nship roads Madapad Eng. Ltd. Guri 66,500,604.95 66,500,604.95 39,738,362.77 12/3/2013 12 months 32 On-going

26

Fabrication and Erection of roads directional signs (Gantry ) and street

naming w ithin DutseMunicipality Durability Eng. Serv ices Dutse 90,081,840.00 90,081,840.00 77,618,236.51 18/3/2014 12 w eeks 87 Stalled

27 Construction of Gw iw a tow nship roads (4.0km) H & M Nig. Ltd. Gw iw a 509,414,865.75 509,414,865.75 412,393,839.50 29/11/2012 6 months 88 Stalled

28 Re-Constr. of Sule Tankarkar Tow nship road (5.16km) Afdin Constr. Co. Ltd. S/tankarkar 727,649,360.56 727,649,360.56 551,343,659.37 4/4/2016 8 months 75 On-going

29 Re-Constr. of Roni Tow nship road (5.00km) Alren Constr. Co. Ltd. Roni 645,608,565.02 645,608,565.02 454,530,055.71 4/4/2016 8 months 70 On-going

30 Re-Constr. of Kazaure Tow nship road (14.643km) Soject Nig. Ltd. Kazaure 2,090,736,236.34 2,090,736,236.34 364,472,396.40 4/4/2016 8 months 17 On-going

31 Re-Constr. of M/madori Tow nship road (6.41km) Triacta Nig. Ltd. M/madori 854,197,382.18 854,197,382.18 4/4/2016 8 months 15 On-going

32

Supply and Installation of 150 units of Standalone Solar streetlight poles w ith

Accessories at Gujungu tow n Marb Eng. & Multy Serv ices Taura 68,307,366.49 68,307,366.49 58,905,653.63 7/29/2016 2 w eeks 86 On-going

33

Constr. of Kila-Budinga-Rambazau-Tsangarw a-Nahuci-Isaw a-Maruta-Jikas-

Zandam Nagogo road (48km) Gerawa Global Eng. Ltd. Gw aram 4,726,302,328.50 4,726,302,328.50 3,779,804,935.20 28/12/2016 19 months 80 On-going

34 Rehab. of Kw anar Dundu-Bulangu road (44km) Alren Constr. Co. Ltd. K/Hausa 3,317,040,538.87 4,452,366,925.12 2,591,928,504.48 28/12/2016 14 months 58 On-going

35 Constr. of Dolen Kw ana-Batu-Kuka Inkiw a-Kupsa feeder road (32.6km) SDY Constr. Co. Ltd. Birniw a 579,242,475.00 579,242,475.00 479,474,038.58 28/12/2016 18 months 83 On-going

36

Constr. of Jigaw ar Dan Ali-Maitsamiy a-S/tankarkar-Dangw anki-Dankumbo

Feeder road w ith Sur from Dankumbo to Matsatsagi (45km) H & M Nig. Ltd. S/tankarkar 639,156,955.50 639,156,955.50 309,172,106.25 28/12/2016 9 months 48 On-going

37

Constr. of Majingini-Maimazari-Dantuw o -Hannun Giw a-Dankumbo feeder

road (11.5km) H & M Nig. Ltd. S/tankarkar 188,786,408.33 188,786,408.33 119,391,221.25 28/12/2016 6 months 63 On-going

38 Constr. of Shuw arin-Wurma-Abay a-Chamo-Isari feeder road (28.9km) Ganan Constr. Co. Ltd. Dutse 379,249,085.25 379,249,085.25 321,198,286.00 28/12/2016 12 months 85 On-going

39 Constr. of Garki-Fagen Gaw o-Kore feeder road (30.8km) Ganan Constr. Co. Ltd. Garki 410,031,381.00 410,031,381.00 231,792,907.50 28/12/2016 14 months 56 On-going

40 Constr. of Kudai-Ruru-Dantaw uy a-Sakw ay a feeder road (15km) NHD Interbiz Pro jects Dutse 170,704,264.51 170,704,264.51 78,888,609.55 28/12/2016 9 months 45 On-going

Balance C/F 26,160,549,690.71 28,057,354,135.48

Page 110: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 36,536,645,095.39 38,433,449,540.16

56

Commissioning as Consultant on the Supervision of the

Construction of Jahun Township Roads (Phase II). HIMMA TECH LTD Jahun 16,450,774.46 16,450,774.46 7,731,864.00 19/06/2017 16 weeks 47 On-going

57

Commissioning as consultanat for the supervision of the Constr of

Dolen Kwana-Batu- Kuka Inkiwa- Kupsa Feeder Road (32.6Km) and

Construction of Majingini- Maimazari- dantuwo- Hannun Giwa-

DanKumbo Feeder Road (11.5Km). EMACS ENG CONSULT State 13,440,505.46 13,440,505.46 5,068,371.65 19/07/2017 12 months 38 On-going

58

Construction of Reinforced Concrete Block line Drains and Culvert

at Aujara Bakin Kasuwa and Tsigi (1650m). Alren Constr. Co. Ltd. Jahun 63,238,372.91 63,238,372.91 22/12/2017 4 Weeks Just mobilized

59 Rehabilitation and upgrading of Aujara access road (1.65KM). Retercha Co. Ltd. Jahun 96,860,399.34 96,860,399.34 22/12/2017 6 weeks Just mobilized

60

Supply and installation s of 150 Units Integrated stand alone Solar

Powered Streetlight at Aujara in Jahun Local Govt Area Sims Nig. Ltd. Jahun 95,192,680.94 95,192,680.94 14/12/2017 12 weeks Just mobilized

61 Constr. of Takur -Jaudi feeder road (4.5km) A. Y.A. Logistics Ltd Dutse 78,896,311.20 78,896,311.20 26,474,700.00 19/10/2017 12 weeks 33 On-going

62

Constr. of Limawa-Galamawa second coat surface dressed road

(2.2km) A. Y.A. Logistics Ltd Dutse 87,785,923.24 87,785,923.24 26,024,777.61 19/10/2017 16 weeks 30 On-going

63 Constr of Drainages and Culverts at Gida Dubu, Dutse Sabon Garin Yaya Ltd. Dutse 96,606,796.61 96,606,796.61 77,491,078.24 3/10/2017 6 months 80 On-going

64

Supply and Installation of 40 unit of 90 watts and 50 unit of 36

watts stand alone solar powered streetlights in the premises of

commissioner's qtrs., Dutse Sims Nig. Ltd. Dutse 31,773,000.00 31,773,000.00 21,535,500.00 19/10/2017 4 Weeks 68 On-going

65

Supply and Installation of 40 unit of 90 watts and 50 unit of 36

watts stand alone solar powered streetlights in and around five

Building blocks at State Secretariat, Dutse Sims Nig. Ltd. Dutse 33,361,650.00 33,361,650.00 27,259,909.05 19/10/2017 4 Weeks 82 On-going

66

TDN & ITC Electrification at Nasarawa and Extension from

Maidubana to Garin malam in Gumel LGA JAG & H Int. Serv. Ltd. Gumel 43,268,605.12 43,268,605.12 22/11/2017 12 weeks Just mobilized

67 Electrification project at Daraji (I) and Daraji (II) in Gwiwa LGA Jignaj Global Ltd Gwiwa 21,183,723.27 21,183,723.27 22/11/2017 8 weeks Just mobilized

68

Supply and Installation of 150 units of solar street light of Aujara in

Jahun LGA. Sims Nig. Ltd. Jahun 95,192,680.94 95,192,680.94 14/12/2017 12 weeks Just mobilized

TOTAL 37,309,896,518.88 39,206,700,963.65

Page 111: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

Min. of Education

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT COMPL. STATUS REMARKS

AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K DATE PERIOD IN %

1

Establishment of 81 Nomadic Adult Literacy Centres in Collaboration with the

Agency for Mass Education Agency for Mass Education Various Schools 10,878,300.00 10,878,300.00 10,878,300.00 27/10/2011 On-going

2

Procurement of 2-sets of Sporting facilities at Bamaina Talented & Gifted School,

B/kudu L.G.A. BM Inv est. Nig. Ltd. B/kudu 36,030,000.00 36,030,000.00 31,987,558.79 16/8/2012 12 weeks 85 On-going

3 Supply of Classrooms, Staff Houses & Office Equip. to JICORAS A. Barde Global Concept. K/hausa 33,143,878.07 33,143,878.07 24,952,793.85 13/12/2012 3 weeks 75 On-going

4 Supply of Library books to JICORAS Al-kassam Jannah K/Hausa 30,785,750.00 30,785,750.00 28,526,075.95 2/5/2013 8 weeks 92 On-going

5 Constr. works at JICORAS (phase II) Datum Constr. Co. K/Hausa 1,677,895,165.73 1,677,895,165.73 1,295,583,983.29 30/8/13 18 weeks 77 On-going

6

Constr. of 1No. Block of Sabbatical Lodge, 5No Principal Officers Quarters 3No

Blocks 240 Capacity Students Hostels and Construction of Road Network Culvert

and Drainages at Jigawa State University Kafin Hausa (Phase III) Datum Const. Nig. LTD K/Hausa 2,574,587,179.00 2,574,587,179.00 873,397,813.68 28/11/2013 6 Months 34 On-going

7 Construction of Senate Building at Jigawa State University , K/hausa A.G Ferrero K/Hausa 1,698,949,299.60 1,698,949,299.60 1,402,653,999.60 24/7/2014 10 months 83 On-going

8 Construction of Vice Chancellor's lodge at Jigawa State University , K/Hausa A.G Ferrero K/Hausa 128,891,563.50 128,891,563.50 118,069,738.50 1/8/2014 9 months 92 On-going

9

Supply and Installation of 5HP Pumps at BEC Camp For the use of State

University Modang Inv estment Nig. Ltd Auyo 2,436,750.00 2,436,750.00 623,000.00 23 On-going

10

Commissioning as Consultant for the Designing and Superv ision of (phase II) for the

constr.of Jigawa State University , K/Hausa Design Plus + K/Hausa 158,703,031.78 158,703,031.78 107,283,361.53 12/18/2014 18months 67 On-going

11

Procurement of 1000no. College Tablets, CAMP 1000 students for the period of (5)

weeks E-learning Programme Activ ities Echo Infotech Solutions H/qtrs. 34,311,150.00 34,311,150.00 28,508,507.50 12/3/2015 2 months 83 Stalled

12

Renov ation of 3NO.Junior Staff Quarters, Galadima 1 & 2 and Senior Staff Quarters

Block at at GGASS Danzomo KAFIYAM A GEN ENT LTD S/tankarkar 15,527,082.00 15,527,082.00 14,711,022.53 30/12/2016 8 w eeks 95 On-going

13 Constr. of 1no. Block of 10-rooms student's Hostel w ith 100 Beds at GSTC Ringim Marb Eng. & Multi-serv ices Ringim 29,145,079.84 29,145,079.84 11,251,599.16 30/12/2016 6 w eeks 38 On-going

14 Constr. of 1no. Block of 3-classrooms w ith 90no. 3-seater Desks. at GSTC Ringim Marb Eng. & Multi-serv ices Ringim 10,013,817.79 10,013,817.79 4,995,211.40 30/12/2016 6 w eeks 49 On-going

15 Constr. of 1no. Block of w orkshop w ith Standard w ork benchs at GSTC Ringim Marb Eng. & Multi-serv ices Ringim 18,564,893.17 18,564,893.17 13,651,194.30 30/12/2016 6 w eeks 73 On-going

16 Constr. of 1no. Block of tw o (2) Science Laboratories at GSTC Ringim Marb Eng. & Multi-serv ices Ringim 28,487,680.00 28,487,680.00 14,554,973.87 30/12/2016 6 w eeks 51 On-going

17

Constr. of Second phase Islamiyya Classroom blocks at Kadeta (Medu

ward) in Gagarawa Constituency. Esmail Ventures Ltd. Gagarawa 2,728,050.34 2,728,050.34 4/4/2017 6 weeks Just mobilized

18 General Renov ation of Gov ernment unity Commercial School Dutse AL-HAMSAD INVST LTD Dutse 87,655,390.48 87,655,391.48 42,353,731.16 22/08/2017 20 weeks 48 On-going

19

Constr. Of 3No.Classrooms Blocks, Administration Block, 2no 6-Seater VIP

Toilet and Provision of 1No. Hand Pump at Government Day Secondary

School Danmasara, Dutse. MUTUAL INFRASTRU Dutse 28,008,767.60 28,008,767.60 22/08/2017 8 weeks just mobilized

BAL. C/F 6,606,742,828.90 6,606,742,829.90

Page 112: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 6,606,742,828.90 6,606,742,829.90

20

Constr. Of Islamiyya Classroom Blocks as Contituency Project at Mariri,

Kangire and Nafara in Birnin Kudu Constituency NUSHE BUSINESS RES B/Kudu 9,819,816.00 9,819,816.00 23/08/2017 6 Weeks just mobilized

21

Constr. Of Islamiyya Classroom Blocks 2017 Constituency Project Phase I

at Meso and Diginsa in Birniwa Local Government Area. MUSFAT GEN ENTER Birniwa 6,536,639.40 6,536,639.40 7/9/2017 5 Weeks just mobilized

22

Constr. Of Islamiyya Classroom Blocks as Contituency Project at Malam

Bako Gari and Togai in Sule Tankarkar Constituency MANHAF GLOBAL CONS S/tankarkar 6,538,905.86 6,538,905.86 23/08/2017 5 Weeks just mobilized

23

Constr. Of Islamiyya Classroom Blocks 2017 Constituency Project Phase I

at Garin Gambo and Karkasara in Gumel Local Government Area. JAG & H INT SERVICES Gumel 6,492,754.80 6,492,754.80 23/08/2017 5 Weeks just mobilized

24

Constr. Of Islamiyya Classroom Blocks 2017 Constituency Project Phase I

at Malarin Gama and Matsa in Malam Madori Local Government Area. AZZIDS NIG ENT LTD M/Madori 6,519,858.46 6,519,858.46 16/08/2017 5 Weeks just mobilized

25

Constr. Of Islamiyya Classroom Blocks 2017 Constituency Project Phase I

at Babebara, Kazaurawa, Wurya, wurya and Zangon Nagogo in Gwaram

Local Government Area. AZZIDS NIG ENT LTD Gwaram 16,321,387.00 16,321,387.00 16/08/2017 7 weeks just mobilized

26

Constr. Of Islamiyya Classroom Blocks 2017 Constituency Project Phase I

at kadoma , Kularan and Gidan Gamji in Jahun Local Government Area. LOYALTY PROPERTIE LTD Jahun 9,797,397.75 9,797,397.75 6,216,598.50 17/08/2017 6 Weeks 63 On-going

27

Constr. Of Islamiyya Classroom Blocks 2017 Constituency Project Phase I

at Bakin Jeji,Jutai, Ijje and G/sarkin Aska in Dutse Local Government Area. ALKASAM JANNAH NIG LTD Dutse 13,117,868.10 13,117,868.10 16/08/2017 6 Weeks On-going

28

Constr. of a block 3 classrooms, an Admin Block, Constr. Of 2No. 6-Seater

VIP Toilets, Provision of 1No. Hand Pump and constr. Of a Block of

Laboratory at GGDSS Gumel DANGATA MEMORIAL Gumel 38,086,803.23 38,086,803.23 31,467,256.84 24/08/2017 12 Weeks 82 On-going

29

Constr. of a block 3 classrooms, an Admin Block, Constr. Of 2No. 6-Seater

VIP Toilets, Provision of 1No. Hand Pump and constr. Of a Block of

Laboratory at GGDSS Dutse BABANDOKI GEN ENT LTD Dutse 37,962,436.27 37,962,436.27 28,497,014.14 24/08/2017 12 Weeks 75 On-going

30

Constr. of a block 3 classrooms, an Admin Block, Constr. Of 2No. 6-Seater

VIP Toilets, Provision of 1No. Hand Pump at GGDSS M/madori BABANDOKI GEN ENT LTD M/Madori 29,031,555.81 29,031,555.81 20,879,779.24 24/08/2017 12 Weeks 72 On-going

31

Constr. Of a block of 3-Class Rooms, Constr.. Of an Admin, Block, Constr. Of

2No. 6 Seater VIP Toilets and Provision of 1No. Hand Pump at GDSS Shagari

Quarters, Hadejia DANGATA MEMORIAL Hadejia 29,008,767.70 29,008,767.70 20,879,779.24 24/08/2017 12 Weeks 72 On-going

32

Constr. Of a block of 3-Class Rooms, Constr.. Of an Admin, Block, Constr. Of

2No. 6 Seater VIP Toilets and Provision of 1No. Hand Pump at GGDSS

Babura DANGATA MEMORIAL Babura 31,487,476.82 31,487,476.82 20,157,721.14 24/08/2017 12 Weeks 64 On-going

BAL. C/F 6,847,464,496.10 6,847,464,497.10

Page 113: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 6,847,464,496.10 6,847,464,497.10

33

Constr. Of a block of 3-Class Rooms, Constr.. Of an Admin, Block, Constr. Of

2No. 6 Seater VIP Toilets and Provision of 1No. Hand Pump at GGDSS

Kiyawa NGALOMA CONST LTD Kiyawa 28,851,997.41 28,851,997.41 23,351,821.34 24/08/2017 2 Weeks 81 On-going

34

Constr. Of a block of 3-Class Rooms, Constr.. Of an Admin, Block, Constr. Of

2No. 6 Seater VIP Toilets and Provision of 1No. Hand Pump at GGDSS Roni SABON GARIN YAYA Roni 29,141,489.44 29,141,489.44 25,430,638.41 24/08/2017 12 Weeks 87 On-going

35

Constr. Of a block of 3-Class Rooms, Constr.. Of an Admin, Block, Constr. Of

2No. 6 Seater VIP Toilets and Provision of 1No. Hand Pump and Constr. Of a

Block of Laboratory at GGDSS Kazaure IMAM AHMAD NIG LTD Kazaure 38,086,803.23 38,086,803.23 23,266,638.25 24/08/2017 12 Weeks 61 On-going

36 Constr. Of Twelve (12No) Hand Pumps to Schools at Various Locations BABANDOKI GEN ENT Various 9,344,745.00 9,344,745.00 4,672,237.50 24/08/2017 12 Weeks 50 On-going

37

Renovation of Science /ICT Laboraties at 8No. Centre of Excellence in the

state (GGUSS Kazaure, GUSS Maigatari, GDSS Babura, GGUSS M/Madori,

GDSS Garun Gabas, GDSS Bulangu, GUSS Basirka and GGUSS Gwaram). MUGIN INVT LTD Various 41,352,400.79 41,352,400.79 22,548,446.79 21/08/2017 12 Weeks 54 On-going

38

Variation for Variation / Additional Workls in Respect of Lott II&III at Sule

Lamido University, Kafin Hausa. DATUM CONST NIG LTD K/Hausa 238,484,947.28 238,484,947.28 14/08/2017 On-going

39

Procurement and Installation of Ict Equipment at 8No. Centre of ex cellence (GGUSS

Kazaure, GUSS Maigatari, GDSS Babura, GGUSS M/Madori, GDSS Garun Gabas,

GDSS Bulangu, GUSS Basirka and GGUSS Gw aram). NGALOMA CONST LTD Various 148,885,944.48 148,885,944.48 100,488,202.92 17/08/2017 8 w eeks 67 On-going

40

Supply of 30,000 Sets of Schools Uniforms to all SS-1 Girls of Senior Secondary

Schools Across the State 313 TEXTILE NIG LTD State 74,655,000.00 74,655,000.00 52,258,500.00 22/08/2017 8 w eeks 70 On-going

41

Construction of Block of 3-Classrooms, Adminisrative Block, 2No. Of 6-

seater pit latrines and 1No. Hand Pump at Government Day Secondry

School Jahun (lot-8) for 2017 1St and 2nd Quarter Capital projects (Phase

II) across the State. Modang Invest Ltd Jahun 29,102,893.90 29,102,893.90 27/12/2017 12 weeks just mobilized

42

Construction of Block of 3-Classrooms, Adminisrative Block, Laboratoty

Block, 2No. Of 6-seater pit latrines and 1No. Hand Pump at Government

Day Secondry School Kanti Kazaure (lot-12) for 2017 1St and 2nd Quarter

Capital projects (Phase II) across the State. A A Maikatako Gen. Kazaure 29,158,821.20 29,158,821.20 27/12/2017 12 weeks just mobilized

43

Construction of Block of 3-Classrooms, Adminisrative Block, 2No. of 6-

seater pit latrines and 1No. Hand Pump at Government Day Secondry

School Galamawa (lot-11) for 2017 1St and 2nd Quarter Capital projects

(Phase II) across the State. A A Maikatako Gen. Dutse 29,158,821.11 29,158,821.11 27/12/2017 12 weeks Just mobilized

BAL. C/F 7,543,688,359.94 7,543,688,360.94

Page 114: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 7,543,688,359.94 7,543,688,360.94

44

Construction of Block of 3-Classrooms, Adminisrative Block, 2No. of 6-

seater pit latrines and 1No. Hand Pump at Government Day Secondry

School Dutse (lot-14) for 2017 1St and 2nd Quarter Capital projects (Phase

II) across the State. Sassauci Multi Trade Dutse 29,137,148.24 29,137,148.24 27/12/2017 12 weeks Just mobilized

45

Construction of Block of 3-Classrooms, Adminisrative Block, 2No. of 6-

seater pit latrines and 1No. Hand Pump at Government Day Secondry

School Kadira (lot-15) for 2017 1St and 2nd Quarter Capital projects (Phase

II) across the State. Sassauci Multi Trade K/kasamma 29,137,148.24 29,137,148.24 27/12/2017 12 weeks Just mobilized

46

Construction of Block of 3-Classrooms, Adminisrative Block, 2No. of 6-

seater pit latrines and 1No. Hand Pump at Government Day Secondry

School Dakido (lot-16) for 2017 1St and 2nd Quarter Capital projects

(Phase II) across the State. Masaka Glo. Con. Ltd M/madori 29,140,358.61 29,140,358.61 27/12/2017 12 weeks Just mobilized

47

Construction of Block of 3-Classrooms, Adminisrative Block, 2No. of 6-

seater pit latrines and 1No. Hand Pump at Government Day Secondry

School Dansure (lot-13) for 2017 1St and 2nd Quarter Capital projects

(Phase II) across the State. Sassauci Multi Trade Roni 29,137,148.24 29,137,148.24 27/12/2017 12 weeks Just mobilized

48

Construction of Block of 3-Classrooms, Adminisrative Block, Laboratoty

Block, 2No. Of 6-seater pit latrines and 1No. Hand Pump at Government

Day Secondry School Gada (lot-19) for 2017 1St and 2nd Quarter Capital

projects (Phase II) across the State. Sabon Gari 'Ya'ya Nig Kazaure 37,964,046.26 37,964,046.26 27/12/2017 12 weeks Just mobilized

49

Construction of Block of 3-Classrooms, Adminisrative Block, Laboratoty

Block, 2No. Of 6-seater pit latrines and 1No. Hand Pump at Government

Day Secondry School Ringim (lot-21) for 2017 1St and 2nd Quarter Capital

projects (Phase II) across the State. Sabon Gari 'Ya'ya Nig Ringim 37,964,046.26 37,964,046.26 27/12/2017 12 weeks Just mobilized

50

Construction of Block of 3-Classrooms, Adminisrative Block, Laboratoty

Block,2No. Of 6-seater pit latrines and 1No. Hand Pump at Government

Day Secondry School Dundubus (lot-18) for 2017 1St and 2nd Quarter

Capital projects (Phase II) across the State. Imam Ahmad Nig. Ltd. Dutse 37,923,773.12 37,923,773.12 27/12/2017 12 weeks Just mobilized

51

Construction of Block of 3-Classrooms, Adminisrative Block, Laboratoty

Block, 2No. Of 6-seater pit latrines and 1No. Hand Pump at Government

Day Secondry School Hadejia (lot-20) for 2017 1St and 2nd Quarter Capital

projects (Phase II) across the State. Imam Ahmad Nig. Ltd. Hadejia 37,923,773.12 37,923,773.12 27/12/2017 12 weeks Just mobilized

52

Construction of Block of 3-Classrooms, Adminisrative Block, Laboratoty

Block, 2No. Of 6-seater pit latrines and 1No. Hand Pump at Government

Day Secondry School Sabuwar Gwaram (lot-10) for 2017 1St and 2nd

Quarter Capital projects (Phase II) across the State. A A Maikatako Gen. Gwaram 29,158,821.11 29,158,821.11 27/12/2017 12 weeks Just mobilized

53

Construction of One (1No.) Students Hostel on Existing foundation at the

Institute of Information Technology, Kazaure. Nushe Biz. Resources Kazaure 49,831,834.74 49,831,834.74 18/12/2017 12 weeks Just mobilized

BAL. C/F 7,891,006,457.88 7,891,006,458.88

Page 115: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 7,891,006,457.88 7,891,006,458.88

54

Construction of Block of 3-Classrooms, Adminisrative Block, Laboratoty

Block, 2No. Of 6-seater pit latrines and 1No. Hand Pump at Government

Day Secondry School Ringim (lot-9) for 2017 1St and 2nd Quarter Capital

projects (Phase II) across the State. Alhansad Invest. Ltd. Ringim 29,086,685.06 29,086,685.06 27/12/2017 12 weeks Just mobilized

55

Construction of Block of 3-Classrooms, Adminisrative Block, Laboratoty

Block, 2No. Of 6-seater pit latrines and 1No. Hand Pump at Government

Day Secondry School Gada (lot-17) for 2017 1St and 2nd Quarter Capital

projects (Phase II) across the State. Alhansad Invest. Ltd. Kazaure 38,092,674.78 38,092,674.78 27/12/2017 12 weeks Just mobilized

56

Supply and disribution of 3-Seater Desks (Lot-1) at Senior Secondry Schools

for 2017 1St and 2nd Quarter Capital projects (Phase II) across the State. Modang Invest Ltd Across the state 13,919,062.50 13,919,062.50 27/12/2017 6 weeks Just mobilized

57

Supply and disribution of 3-Seater Desks (Lot-2) at Senior Secondry Schools

for 2017 1St and 2nd Quarter Capital projects (Phase II) across the State. Babandoki Gen. Ent. Ltd. Across the state 10,745,876.25 10,745,876.25 27/12/2017 6 weeks Just mobilized

58

Supply and disribution of 3-Seater Desks (Lot-4) at Senior Secondry Schools

for 2017 1St and 2nd Quarter Capital projects (Phase II) across the State. Wajab Building Across the state 11,244,675.96 11,244,675.96 27/12/2017 6 weeks Just mobilized

59

Supply and disribution of 3-Seater Desks (Lot-6 & 3) at Senior Secondry

Schools for 2017 1St and 2nd Quarter Capital projects (Phase II) across the

State. Abdulcom Proj. & Service Across the state 60,124,242.25 60,124,242.25 27/12/2017 12 weeks Just mobilized

60

Supply and disribution of 3-Seater Desks (Lot-7 & 5) at Senior Secondry

Schools for 2017 1St and 2nd Quarter Capital projects (Phase II) across the

State. Furni Elect Global Across the state 12,661,754.35 12,661,754.35 27/12/2017 12 weeks Just mobilized

63

procurement of E-Books Software for Senior Secondry Schools across the

State Learn Africa Nig. Ltd Across the state 10,000,000.00 10,000,000.00 22/12/2017 8 weeks Just mobilized

66

Constr. of Second phase Islamiyya Classroom blocks at Fanisau (Karnaya

ward) and Gofai (Limawa ward) in Dutse Constituency Al-kasam Jannah Dutse 5,551,958.00 5,551,958.00 20/3/2017 6 weeks Just mobilized

69

Constr. of Second phase Islamiyya Classroom blocks at Kukuma Kofar

Yamma and Gubabbiya (Madabe ward) in Buji Constituency Loyalty Properties Ltd. Buji 5,449,021.80 5,449,021.80 20/3/2017 6 weeks Just mobilized

Total 8,087,882,408.83 8,087,882,409.83

Page 116: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

Government House

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT AMOUNT REVISED VA LUE OF C OM M EN C EM EN TC OM P L. STATUS REMARKS

(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Total - -

Page 117: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

Min of Land & Housing

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT (N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

1

Constr. of Official Residence of the Secretary to the State Government

(SSG) at Dutse Sahal-Bin Nig. Ltd. Dutse 55,984,869.84 81,708,978.77 64,280,375.51 11/23/2016 16 weeks 79 On-going

2

Constr. of Official Residence of the Head of Civ il Serv ice (HOS) at

Dutse Design Three Sixty Ltd. Dutse 57,712,714.98 76,417,973.36 53,040,338.14 11/23/2016 16 weeks 69 On-going

TOTAL 113,697,584.82 158,126,952.13

Page 118: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT (N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BALANCE B/F 113,697,584.82 158,126,952.13

26

TOTAL 113,697,584.82 158,126,952.13

Page 119: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

Min. of Commerce

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT AMOUNT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

1 Constr. of (3.5km) Culverts & Drainage at Sara Market Beefar Constr. Nig. Ltd. Gwaram 76,329,801.45 76,329,801.45 59,864,067.40 22/11/2012 3 months 78 Stalled

2 Extension of road works at Maigatari Border Free Zone Beefar Constr. Nig. Ltd. Maigatari 37,677,600.00 37,677,600.00 11,259,724.00 11/12/2012 20 weeks 30 Stalled

3

Consultancy services for the Constr. of

Drainages at Sara, Maigatari + Gujungu

markets Stirling Dev. Ltd. State 19,140,670.57 19,140,670.57 16,621,973.19 14/10/12 6 months 90 Stalled

Total 133,148,072.02 133,148,072.02

Page 120: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

Directorate of Economic Empowerment

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

Total - -

Page 121: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

Dutse Capital Development Agency

P OST C ON T R A C T P R OJEC T EVA LUA T ION

S/ N P R OJEC T EXEC UT OR LOC A T ION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS

AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %

1 Constr. of New High Brow lay out in Dutse Dantata & Saw oe Dutse 3,822,690,275.89 5,073,417,718.02 4,577,814,987.09 14/10/2011 48 w eeks 83 Stalled

2 Constr. of Dutse tow nship road (15 & 20) Dantata & Saw oe Dutse 760,653,932.06 760,653,932.06 540,282,932.70 20/12/12 16 w eeks 73 Stalled

3

Prov ision & Installation of Streetlights at the 3 Arms zone, Ibrahim Aliy u

Eastern By e-pass and Old Police Hqrs. To Gadadin-Fanisau Link road,

Dutse. Dantata & Saw oe Dutse 1,064,545,077.91 1,267,613,083.02 1,058,862,394.59 8/11/2012 12 w eeks 95 Stalled

4 Rehab. Of Dutse Tow nship road phase II (10.110km) CGC Nig. Ltd. Dutse 2,129,872,584.00 3,173,304,408.80 2,688,981,022.36 8/11/2012 14 months 82 Stalled

5 Rehab. Of Dutse Tow nship road phase I (1.250km) CGC Nig. Ltd. Dutse 487,164,968.00 972,442,157.57 812,016,426.23 8/11/2012 14 months 83 Stalled

6 Re-dualisation of Old Police H/qtrs-Gadadin road (2.55km) Dantata & Saw oe Dutse 1,487,873,351.19 1,487,873,351.19 646,282,346.61 11/4/2013 6 months 41.37 Stalled

7 Dualisation of Ibrahim Aliy u road (Dutse Eastern By e-pass) (5.65km) Dantata & Saw oe Dutse 2,861,812,037.79 3,160,794,816.68 1,471,973,980.73 11/4/2013 9 months 46 On-going

8 Constr. of 30No. Houses for Lagislators Afdin Constr. Co. Ltd. Dutse 1,682,137,080.00 1,995,675,982.50 1,822,670,433.15 19/8/13 14 month 91 On-going

9

Consultant for the Constr. Of 30N0. Houses for Jigaw a State members of

the House of Assembly at Disina HAG Eng. Nig. Limited Dutse 131,922,214.60 147,301,384.74 140,671,347.56 11/7/2012 14 months 91 On-going

10

Constr. Of Streetlights on Dutse township roads (17.576KM) phase I

& II CGC Nig. Limited Dutse 666,041,660.55 666,041,660.55 543,723,853.77 9/9/2013 16 weeks 85 Stalled

11

Constr. Of Access road (1.92KM) at the New House of Assembly

Members Qtrs. Disina, Dutse CGC Nig. Limited Dutse 419,305,302.03 419,305,302.03 303,493,140.29 19/9/2013 5 months 73 Stalled

12 Constr. Of River Re- Alignment project at Dutse, phase 1 (2KM) Dantata & Sawoe Dutse 1,999,219,676.02 1,999,219,676.02 558,276,899.20 26/9/2013 6 months 24 Stalled

13

Landscaping and External works at new Jigawa State

Broadcasting Complex Dantata & Sawoe Dutse 657,635,647.36 657,635,647.36 457,989,460.07 31/3/2014 6 months 66 Stalled

14

Supply and Installation of Fire Tender Trucks, Scanning Machine,

Check- in counters and Baggage handling Systems and Airfield

Lighting at new Dutse Int. Airport Afdin Constr. Nig. Ltd. Dutse 2,680,358,940.00 2,680,358,940.00 2,619,594,717.36 4/6/1900 4weeks 98 Ongoing

15

Letter of Commissioning as Consultant for the superv ision of the Dutse

International Airport project Phase 1c (Additional w orks) El-Mansur Atelier Co. Dutse 124,304,403.67 124,304,403.67 123,180,403.67 2/3/2015 12 months 99 On-going

TOTAL 20,975,537,151.07 24,585,942,464.21

Page 122: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

Cabinet Office

POST CONTRACT PROJECT EVALUATION

S/ N P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T R EVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS

A M OUN T (N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %

1 Upgrading and Renov ation of Jigaw a State Gov ernor's Lodge Kano Anhas Nig. LTD Kano 123,614,216.81 123,614,216.81 71,987,817.49 5/11/2013 9 Months 58 On-going

2

Commissioning as Consultant on the Superv ision of the Upgrading

and Renov . of Gov ernor's Lodge Kano Design+ Consultant LTD Kano 10,097,505.90 10,097,505.90 6,555,808.21 19/11/2013 9 Months 75 On-going

3

Constr. of Daily pray er mosque at Madaw aki, Danzomo Gari and

D/tuw o gari in Sule Tankarkar Constituency NUSHE BUSINESS REC. LTD S/Tankarkar 4,712,464.77 4,712,464.77 1,525,069.35 12/15/2016 6 w eeks 36 On-going

4

Constr. of Juma'at Pray er Mosque at Medu in Gagaraw a

Constituency . Umar Roofing Products Gagaraw a 25,853,039.07 25,853,039.07 13571539.97 24/01/2017 16 w eeks 52 On-going

5

Constr. of Juma'at Prayer Mosque at Galambi, fagam

Constituency in Gwaram LGA. Ramadan Constr. Nig. Ltd. Gwaram 26,396,975.14 26,396,975.14 23,566,006.59 24/01/2017 16 weeks 89 On-going

6

Constr. of Juma'at Prayer Mosque at Kukuma yamma and

Gubabiya in Buji Constituency. Loyalty Properties Nig. Ldt. Buji 5,613,871.72 5,613,871.72 24/01/2017 6 weeks Just mobilized

7

Bituminous felt roofing and some renovations of Dutse

Central mosque Equishare Nig. Ltd. Dutse 12,552,135.05 12,552,135.05 9,828,937.91 16/8/2017 6 weeks 78 On-going

8

Constr. of five (5) Daily prayer Mosques at Kasarwa and

Jangiwa in Birniwa Constituency. Musfat Gen. Investment Birniwa 4,116,102.90 4,116,102.90 16/10/2017 6 weeks Just mobilized

9

Constr. of five (5) Daily prayer Mosques at Gidan Mutari,

Fulanin Harbo, Danmodi Gari and Hammado in Sule

Tankarkar Constituency. Munhab Global Ventures S/Tankarkar 6,543,114.75 6,543,114.75 16/10/2017 6 weeks Just mobilized

10

Constr. of Friday prayer mosque at Gada yamma in Kazaure

Constituency. (B) Yanduna Ventures Kazaure 46,882,392.01 46,882,392.01 25,133,493.06 25/10/2017 12 Weeks 53 On-going

11

Constr. of Five (5) Daily Prayer Mosques at Dawan gawo and

Karkarna in Yankwashi Constituency. Granitoids Eng. Services Yankwashi 6,148,095.00 6,148,095.00 16/10/2017 6 weeks Just mobilized

BAL. C/F 272,529,913.12 272,529,913.12

Page 123: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENTC OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 272,529,913.12 272,529,913.12

12

Constr. of Five (5) Daily Prayer Mosques at Dawan gawo and

Karkarna in Gumel Constituency. JAG & H Integrated Serv. Ltd. Gumel 4,120,393.20 4,120,393.20 16/10/2017 6 weeks Just mobilized

13

Constr. of Five (5) Daily Prayer Mosques at Dausayi, Sabon

Garin Dandi and Suntilmawa in Kazaure Constituency. (A) MARB Eng. & Multy Serv. Kazaure 6,192,036.90 6,192,036.90 9/11/2017 6 weeks Just mobilized

14

Constr. of Friday Prayer Mosques at Tsabare, Dandi, Tofa and

Gidan Sarki (Friday Mosque) in Kazaure Constituency. (B) MARB Eng. & Multy Serv. Kazaure 24,779,470.59 24,779,470.59 9/11/2017 12 weeks Just mobilized

15

Constr. of Friday Prayer Mosques at Nasarawa in Gumel

Constituency. JAG & H Integrated Serv. Ltd. Gumel 15,046,340.35 15,046,340.35 16/10/2017 12 weeks Just mobilized

16

Construction of Five (5) daily Prayer Mosques at Wutsadaand

Kankare Fulani in Gwaram Constituency. Al-Nasibi Gen. Intp. Gwaram 4,129,061.98 4,129,061.98 18/12/2017 4 Weeks Just mobilized

17

Construction of Five (5) daily Prayer Mosques at Namako

(Sabon Gari Ward) in Miga Constituency. Khairussabah Nig. Ltd Miga 2,064,530.99 2,064,530.99 18/12/2017 4 Weeks Just mobilized

18

Construction of Five (5) daily Prayer Mosques at Garin Baki,

Dan Farantama, Zuge and Tudun D/Bulim in Gumel

Constituency. Jag & H Intgrt. Serv. Ltd. Gumel 8,258,123.96 8,258,123.96 18/12/2017 8 Weeks Just mobilized

19

Construction of Five (5) daily Prayer Mosques at Karshi and

Aimas Kuka in Auyo Constituency. Amm Manzo Nig. Ltd. Auyo 4,129,061.98 4,129,061.98 18/12/2017 6 Weeks Just mobilized

20

Construction of Five (5) daily Prayer Mosques at Kukuma Kudu

(Kumuma Ward), Dakori (Gantsa Ward) and Falgeri Arewa

(Falgeri Ward) in Buji Constituency. K-Manu Gen. Constr. & Engr Buji 6,193,592.97 6,193,592.97 18/12/2017 8 Weeks Just mobilized

21

Construction of Five (5) daily Prayer Mosques at S/G

Shinakani, Galadimawa and Bulangori in Buji Constituency. A+Tech Intgrt. Service Buji 6,193,592.97 6,193,592.97 18/12/2017 6 Weeks Just mobilized

22

Construction of Five (5) daily Prayer Mosques at Kiramisau,

Tage (Fandu Ward) and Maikintari (Kirikasamma Ward) in

Kirikasamma Constituency. Alh Umar Baban Doki Nig Ltd K/kasamma 6,193,592.97 6,193,592.97 18/12/2017 6 Weeks Just mobilized

BAL. C/F 359,829,711.98 359,829,711.98

Page 124: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENTC OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 359,829,711.98 359,829,711.98

23

Construction of Five (5) daily Prayer Mosques at Kiramisau,

Tage (Fandu Ward) and Maikintari (Kirikasamma Ward) in

Kirikasamma Constituency. Alh Umar Baban Doki Nig Ltd K/kasamma 6,193,592.97 6,193,592.97 18/12/2017 6 Weeks Just mobilized

24

Construction of Five (5) daily Prayer Mosques at Garbagar

Gari (Garbagai Ward), Wareri (Guri Ward), Zoriyo (Adiyani

Ward), Jauron Kadira (Kadira Ward) and Dolewa (Kadira

Ward) in Guri Constituency. Alh Umar Baban Doki Nig Ltd Guri 10,322,654.95 10,322,654.95 18/12/2017 8 Weeks Just mobilized

25

Construction of Five (5) daily Prayer Mosques at Asayaya Gari

(Sule Ward), Garin Tamba (Taka Tsaba Ward), Muku Gari and

renovation of 1No. Mosque at Sule Kudu Primary School (Sule

Ward) in Sule Tankarkar Constituency. Khairubaba Nig. Ltd. S/tankarkar 8,258,123.96 8,258,123.96 18/12/2017 8 Weeks Just mobilized

26

Construction of Five (5) daily Prayer Mosques at Gidan Nagari,

Damaganawa Yamma, Kadirawa Aduchawa, Zage dantse,

Kaka lafiya, Zareku, Koya, Burji Abuja, Gwari and Zugawa in

Miga Constituency. Amia Intgr Serv. Nig. Ltd. Miga 20,645,309.99 20,645,309.99 18/12/2017 12 Weeks Just mobilized

27

Construction of Five (5) daily Prayer Mosques at

Makwarawa(Tofa Ward) and Dabi (Dabi ward) in Ringim

Constituency. Prestige Intgrt. Serv. Ringim 4,129,061.98 4,129,061.98 18/12/2017 6 Weeks Just mobilized

28

Construction of Five (5) daily Prayer Mosques at mazazzaga

(Garko Ward) and Balago Town Balago Ward) in Kiyawa

Constituency. Demastbo Ventures Ltd. Kiyawa 4,129,061.98 4,129,061.98 18/12/2017 6 Weeks Just mobilized

29

Construction of Five (5) daily Prayer Mosques at Kandila

Wuriya (Machinamari Ward), Balamalum (Machinamari

Ward) and matamu (Matamu Ward) in Birniwa Constituency. Masaka Global Concept Ltd Birniwa 6,193,592.97 6,193,592.97 18/12/2017 6 Weeks Just mobilized

30

Construction of Five (5) daily Prayer Mosques at Jemawa,

Sansami, Muna fadi and Construction of Juma'at Prayer

Mosque at Kanya Town in Kanya Babba Constituency of

Babura Local Govt Area. Deetech Nig. Ltd. Babura 16,304,386.14 16,304,386.14 18/12/2017 12 Weeks Just mobilized

31

Construction of Five (5) daily Prayer Mosques at Mirgina,

Danbuwayi, Zuge, UnguwarKiwo, Dan Goriba and

Construction of Juma'at Prayer Mosque at Danbanki in Sule

Tankarkar Constituency. Bulangu Drilling Services S/tankarkar 22,536,624.84 22,536,624.84 18/12/2017 12 Weeks Just mobilized

BAL. C/F 458,542,121.76 458,542,121.76

Page 125: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENTC OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 458,542,121.76 458,542,121.76

32

Construction of Five (5) daily Prayer Mosques at Kajimaran

(Dawa Ward), Garin Malam (Abunabo Ward), Zango Tsangaya

(Matara Babba Ward), Guri Nayinawa (Guri Ward) and Guri

Town Yallari (Guri Ward) in Guri Constituency. Jiffa Enterprises Guri 10,322,654.95 10,322,654.95 18/12/2017 8 Weeks Just mobilized

33

Construction of Five (5) daily Prayer Mosques at J/Habuja,

Gorum Wangara, Barde rabe (Madobi Ward), Maya-maya

(Kudai Ward), Katangar Lafiya (Madobi Ward) and Sharifai

(Madobi Ward) in Dutse Constituency. Al-Kasam Jannah Nig. Ltd. Dutse 14,451,716.93 14,451,716.93 18/12/2017 8 Weeks Just mobilized

34

Construction of Five (5) daily Prayer Mosques at Kabala,

Sabuawr Gada, Gabori and Majira in jahun Constituency. Yanduna Ventures Ltd. Jahun 8,258,123.96 8,258,123.96 18/12/2017 8 Weeks Just mobilized

35

Construction of Five (5) daily Prayer Mosques at Shaiskawa,

Gabas, Badado, Mai tsani, Gezoji, Durgutawa, Dunguliya and

Gurunfa in Kazure Constituency. Yanduna Ventures Ltd. Kazaure 14,451,716.93 14,451,716.93 18/12/2017 12 Weeks Just mobilized

36

Construction of Five (5) daily Prayer Mosques at Kandi (Bata

Ward), Unguwar Magaji (BataWard) and

completion/renovation of Juma'at Prayer Mosques at Babura

Central Mosque, Jigawar Dan Ali central and Babura Jibwis in

Babura Constituency. Mufabamex Concept Ltd. Babura 21,631,959.79 21,631,959.79 18/12/2017 12 Weeks Just mobilized

37

Construction of Five (5) daily Prayer Mosques at Dazara Waje,

Lewa, Sara kudu, Unguwar Gwanji, Gwanjira and Yadda in

Gwaram Constituency. Nushe Business Resources Gwaram 12,387,185.94 12,387,185.94 18/12/2017 8 Weeks Just mobilized

38

Construction of Five (5) daily Prayer Mosques at Sabuawar

Kaura, Kiyako, Birnin kudu, Samamiya and Bigidan in Birnin

Kudu Constituency. Nushe Business Resources B/kudu 10,322,654.95 10,322,654.95 18/12/2017 8 Weeks Just mobilized

39

Construction of Three (3) daily Prayer Mosques at Yakasai,

Unik Babba and Kalgwai in Auyo Constituency. Xtra 99 Intgrt Services Ltd. Auyo 6,193,592.97 6,193,592.97 18/12/2017 6 weeks Just mobilized

40

Construction of Juma'at Prayer Mosques at Garin Mado in

Gagarawa Constituency. Modang Investment Ltd. Gagarawa 9,527,340.25 9,527,340.25 18/12/2017 12 Weeks Just mobilized

BAL. C/F 566,089,068.43 566,089,068.43

Page 126: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENTC OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 566,089,068.43 566,089,068.43

41

Construction of Juma'at Prayer Mosques at Gidan Dallaand

Kaban in Auyo Constituency. A.A Aljazeera Agro Processing Auyo 19,880,299.20 19,880,299.20 18/12/2017 12 Weeks Just mobilized

42

Construction of Juma'at Prayer Mosques at Turbus in

Maigatari Constituency. Alkawakeb Global Concept Maigatari 13,748,890.28 13,748,890.28 18/12/2017 12 Weeks Just mobilized

43

Construction of Juma'at Prayer Mosques at Tsadawa,

Abakura and Tsinaho in Taura Constituency. Dan Kwara Maijimina NigLtd Taura 10,258,059.52 10,258,059.52 18/12/2017 12 Weeks Just mobilized

44

Construction of Juma'at Prayer Mosques at Dagaceri (Batu

Ward) in Birniwa Constituency. Amm Manzo Nig. Ltd. Birniwa 14,403,675.29 14,403,675.29 18/12/2017 12 Weeks Just mobilized

45

Construction of Juma'at Prayer Mosques at Tattari Maigatari

Constituency. A.A. Maikatako Gen. Entp Maigatari 8,152,066.79 8,152,066.79 18/12/2017 12 Weeks Just mobilized

46

Construction of Juma'at Prayer Mosques at Karkarna and

completion/renovation of Juma'at prayer Mosque at

Yankwashi Central Mosque in Yankwashi Constituency. Granatoids Engr. Services Yankwashi 29,994,641.37 29,994,641.37 18/12/2017 12 Weeks Just mobilized

47

Completion/renovation of Juma'at Prayer Mosques at Jibwis

Garki in Garki Constituency. Jag & H Intgrt Services Ltd Garki 23,736,083.26 23,736,083.26 18/12/2017 12 Weeks Just mobilized

48

Completion/renovation of Juma'at Prayer Mosques at

Shabaru in Suletankarkar Constituency. A.A. Maikatako Gen. Entp S/tankarkar 3,091,180.72 3,091,180.72 18/12/2017 12 Weeks Just mobilized

49

Completion/renovation of Juma'at Prayer Mosques at

Gabarin, Tsungur, Shafar Daurawa, Sankara, Karshi and

K/Babushe in Ringim Constituency. Marb Engr. & Multi Services Ringim 25,604,269.74 25,604,269.74 18/12/2017 12 Weeks Just mobilized

50

Completion/renovation of Juma'at Prayer Mosques at

Yarkurshe, Dan Barge, Ganga, Kwanar Garki, GGSS Garki,

Kaya, Kargo, Kafadodo and Batakashi in Garki Constituency. MMZ Garki Consrt Ltd Garki 18,344,212.97 18,344,212.97 18/12/2017 12 Weeks Just mobilized

51

Completion/renovation of Juma'at Prayer Mosques at Izala

Basirka, Kawari, Matsango and Construction of Juma'at

Prayer Mosques at Basirka Central and Wall Fencing at Digijin

Juma'at Mosque in Fagam Constituency in Gwaram L. G. A. G. M. Sara & Sons Ltd Gwaram 44,858,345.27 44,858,345.27 18/12/2017 14 Weeks Just mobilized

52

Completion/renovation of Juma'at Prayer Mosques at

Dansure and Roni kudu and Construction of Juma'at Prayer

Mosques at Kaya and Wall Fencing at Takwardawa in Roni

Constituency. Na'ayi Recources Ltd. Roni 33,832,397.35 33,832,397.35 18/12/2017 12 Weeks Just mobilized

BAL. C/F 811,993,190.19 811,993,190.19

Page 127: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENTC OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

BAL. B/F 811,993,190.19 811,993,190.19

53

Construcction of Wall fencing of Juma'at Prayer Mosque at

Gidar Sarki in Kafin Hausa Constituency. AMM Manzo Nig. Ltd. K/Hausa 2,048,758.99 2,048,758.99 18/12/2017 6 Weeks Just mobilized

54

Renov of five (5) Daily prayer mosque at Arki town (Arki ward)

in M/madori Constituency Ramadan Constr Co. M/madori 2,064,530.99 2,064,530.99 18/12/2017 6 Weeks Just mobilized

55

Completion/renovation of Juma'at Prayer Mosques at

Sarawa, Fadawa and Adin in Kafin Hausa Constituency in

Gwaram L. G. A. Demastbo Ventures Ltd. K/Hausa 9,338,782.31 9,338,782.31 18/12/2017 12 Weeks Just mobilized

56

Construction of Five (5) Daily Prayer Mosques at Gilima,

Gidan Naruwa, Kundu-Gidan Liman, Kukuy (Chukuto ward),

Zangon Maje, Kaya-Gazara (Chukuto ward) and Dogon Marke

(Kwalam ward) in Taura Constituency. A.Y. Dan baba Nig. Ltd. Taura 14,451,716.93 14,451,716.93 18/12/2017 8 Weeks Just mobilized

57

Construction of Five (5) Daily Prayer Mosques at Kofar Fada

Mafudi in fagam Constituency. G.M. Sara & Sons Ltd. Gwaram 2,064,530.99 2,064,530.99 18/12/2017 4 Weeks Just mobilized

58

Construction of Five (5) Daily Prayer Mosques at Tsigi, Yar

Kasuwa and Gidan Ganji in Jahun Constituency. A.A. Aljazeera Agro Jahun 6,686,394.75 6,686,394.75 2,117,358.34 16/10/2017 12 Weeks 32 On-going

59

Construction of Five (5) Daily Prayer Mosques at Garbagal

Gari (Garbagal ward), Wareri (Guri Ward), Zoriyo (Adiyani

ward), Jauron Kadira (Kadira ward) and Dolewa (Kadira ward)

in Guri Constituency. Alh. Umaru Baban Doki Guri 10,322,654.95 10,322,654.95 18/12/2017 8 Weeks Just mobilized

60

Construction of Five (5) Daily Prayer Mosques atGuntai Gari in

Gwiwa Constituency. Daragi and Sons Gwiwa 2,064,530.99 2,064,530.99 18/12/2017 4 Weeks Just mobilized

61 Constr o f Friday prayer mosque at Zingaren in Gagarawa Constituency M odeng Invest. Ltd. Gagarawa 16,202,181.67 16,202,181.67 12,561,077.74 13/10/17 12 weeks 77 On-going

62 Constr o f 6no. M osque Kawu Nig. Ltd. K/Hausa 34,411,150.73 34,411,150.73 24,572,622.53 16/10/17 12 weeks 71 On-going

63

Completion of 6no. Juma'at mosque at Basirka, Bagadaza, T/wada,

Kadale, Garko, Gyalman, Lata Dutse, Dalai and Bunbuliya in Fagam

Constituency of Gwaram L.G.A. Ramadan Gen. Ltd. Gwaram 23,935,403.75 23,935,403.75 16,046,195.22 16/10/17 8 weeks 67 On-going

64 Constr o f Friday mosque at Firjin yamma in Gwiwa constituency Jignag Global Constr Ltd. Gwiwa 25,063,610.67 25,063,610.67 10,883,363.67 16/10/2017 12 weeks 41 On-going

TOTAL 960,647,437.91 960,647,437.91

Page 128: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

Min. of Information

P OST C ON T R A C T P R OJEC T EVA LUA T ION

S/ N P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T A M OUN T R EVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS

(N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %

1

Consultancy Serv ices for the Constr. Of 5No. Mini

Stadiums in the state (stage 1, II & III) Design Plus Consultant Ltd. Dutse 72,628,137.06 72,628,137.06 68,045,437.48 10/2/2012 6 months 94 On-going

Total 72,628,137.06 72,628,137.06

Page 129: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

Min. of Agriculture

P OST C ON T R A C T P R OJEC T EVA LUA T ION

S/ N P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T A M OUN T REVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS

(N ) CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %

1

Procurement of 2000 Metric Tons of Urea (46:0:0) for 2016 Wet

season Atafi Agro Merchandise in the state 224,400,000.00 224,400,000.00 9/5/2016 4 w eeks Rev oked

2

Procurement of 1000 Metric Tons of NPK 20:10:10+1S+1Zn for

2016 Wet season Continental Fertilizer Ltd. in the state 105,000,000.00 105,000,000.00 9/5/2016 4 w eeks Rev oked

3

Procurement of 500 Metric Tons of SSP (0:54:0) for 2016 Wet

season MBS Merchants Ltd. in the state 50,000,000.00 50,000,000.00 9/5/2016 4 w eeks Rev oked

TOTAL 379,400,000.00 379,400,000.00

Page 130: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

Min. of Women Affairs

POST CONTRACT PROJECT EVALUATION

S/ N P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T R EVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS

A M OUN T (N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %

Total - -

Page 131: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

Head of Service

P OST C ON T R A C T P R OJEC T EVA LUA T ION

S/ N . P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T R EVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS

A M OUN T C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %

,

TOTAL - -

Page 132: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

Science & Tech.

P OST C ON T R A C T P R OJEC T EVA LUA T ION

S/ N . P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T R EVISED VA LUE OF C OM M EN C EM EN TC OM P L.ST A T US R EM A R KS

A M OUN T (N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %

Total - -

Page 133: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

State Universal Besic Edu. Board

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENTC OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

1

Total - -

Page 134: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

Jigawa State Independent Electoral Commission

POST CONTRACT PROJECT EVALUATION

S/ N P R OJEC T EXEC UT OR LOC A T IONC ON T R A C T A M OUN T R EVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS

(N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %

Total - -

Page 135: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

Min. of Justice

POST CONTRACT PROJECT EVALUATION

S/ N P R OJEC T EXEC UT OR LOC A T IONC ON T R A C T A M OUN T R EVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS

(N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %

1

Renovation of Juvenile

Prison/Constr. Of gate lodge,

Mosque, Classroom and

Perimeter wall fence at

Babura town. Naila Multi Services Babura 33,500,000.00 37,269,674.07 26,499,632.30 20/12/2016 12 weeks 70 On-going

Total 33,500,000.00 37,269,674.07

Page 136: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

GH

POST CONTRACT PROJECT EVALUATION

S/ N P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T R EVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS

A M OUN T (N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %

Total - -

Page 137: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

Agency for Nomadic Edu.

P OST C ON T R A C T P R OJEC T EVA LUA T ION

S/ N P R OJEC T EXEC UT OR LOC A T IONC ON T R A C T A M OUN T REVISED VA LUE OF C OM M EN C EM EN TC OM P L.ST A T US R EM A R KS

(N ) CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %

Total - -

Page 138: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

Jigawa College of Islamic & Legal

P OST C ON T R A C T P R OJEC T EVA LUA T ION

S/ N . P R OJEC T EXEC UT OR LOC A T ION CONTRACT REVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS

AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %

1 Constr. of Centre for Education Technology at Jigaw a State

College of Islamic & Legal Studies, Ringim DAD A.E. Nig. Ltd. Ringim 38,822,854.32 38,822,854.32 33,525,011.86 2/11/2016 12 w eeks 82 On-going

2 Constr. of Library Complex (phase 1) at College of Islamic and

Legal Studies, Ringim

R & Partners Talatan

Mafara

Ringim 70,000,000.00 70,000,000.00 44,908,143.89 2/2/2017 24 w eeks 64 On-going

Total 108,822,854.32 108,822,854.32

Page 139: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

Bilyaminu College of Edo. Hadejia

P OST C ON T R A C T P R OJEC T EVA LUA T ION

S/ N P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T A M OUN T REVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS

(N ) CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %

2

Constr. of Classrooms and Laboratories

complex at Binyaminu Usman Polytechnic,

Hadejia. DAD A.E. Nig. Ltd. Hadejia 82,582,274.72 82,582,274.72 43,106,485.97 5/1/2017 24 weeks 52 On-going

5

Renov ation + Furnishing of Auditorium at Biny aminu

Usman Poly technic Hadejia

Performance Eng. Ltd. Hadejia 47,850,711.06 47,850,711.06 29,799,765.07 29/07/17 8 w eeks 62 On-going

TOTAL 130,432,985.78 130,432,985.78

Page 140: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

Min. of Environment

POST CONTRACT PROJECT EVALUATION

S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %

1

Constr of Drainages at Achauya village,

S/Tankarkar Constituency. Sukudai Constr. Nig. Ltd. S/tankarkar 12,017,528.27 12,017,528.27 10,459,494.05 20/11/2017 12 weeks 87 On-going

2

Constr. of Storm Water Drainages at Chamo town

in Dutse LGA (3000M) Loyalty Properties Ltd. Dutse 91,450,000.00 91,450,000.00 24/10/2017 12 weeks On-going

3

Constr. of Storm Water Drainages at Galamawa

town in Dutse LGA (1,600M) Loyalty Properties Ltd. Dutse 48,622,000.00 48,622,000.00 38,570,280.00 24/10/2017 12 weeks 72 On-going

4

Constr. of Storm Water Drainages at Garu town in

Dutse LGA A. Amadu Maikatako Dutse 26,132,000.00 26,132,000.00 24/10/2017 12 weeks On-going

5

Constr. of Storm Water Drainages at Yalleman

town in Kaugama LGA A. Amadu Maikatako Kaugama 56,839,408.01 56,839,408.01 32,382,654.25 24/10/2017 16 weeks

57

On-going

6 Constr. of Drainage at K/fada basirka (phase II) Dazal Nig. Ltd. Gw aram 8,236,789.42 8,236,789.42 7,260,034.95 18/09/2017 8 w eeks

88

On-going

Total 243,297,725.70 243,297,725.70

Page 141: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

Jigawa State College of Edu. Gumel

P OST C ON T R A C T P R OJEC T EVA LUA T ION

S/ N . P R OJEC T EXEC UT OR LOC A T ION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS

AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K (N ) D A T E P ER IOD IN %

Total - -

Page 142: JIGAWA STATE GOVERNMENT...• Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less

Jigawa College of Info. Tech. Kazaure

P OST C ON T R A C T P R OJEC T EVA LUA T ION

S/ N . P R OJEC T EXEC UT OR LOC A T ION CONTRACT REVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS

AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %

1 Constr of 1no. Student Hostel on ex isting foundation at

Informatic Institute Kazaure

Nushe Business

Resources

Kazaure 49,793,055.32 49,793,055.32 41,658,532.65 24/10/2017 8 w eeks 80 On-going

TOTAL 49,793,055.32 49,793,055.32