JIGAWA STATE GOVERNMENT
DUE PROCESS AND PROJECT MONITORING BUREAU
OFFICE OF THE EXECUTIVE GOVERNOR
END OF YEAR PROJECTS REPORT
JANUARY TO DECEMBER, 2017
WEB: WWW.JIGAWADUEPROCESS.COM
EMAIL: [email protected]
CONTENTS SECTION (A) - EXECUTIVE SUMMARY
SECTION (B) - CHARTS
SECTION (C) - PRE-CONTRACTS EVALUATIONS JANUARY TO DECEMBER, 2017
SECTION (D) - CONTRACTS AWARDED JANUARY TO DECEMBER, 2017
SECTION (E) - COMPLETED PROJECTS
SECTION (F) - ON-GOING PROJECTS
- MINISTRY OF HEALTH - MINISTRY OF WATER RESOURCES - MINISTRY OF WORKS AND TRANSPORT - MINISTRY OF EDUCATION, SCIENCE & TECHNOLOGY - GOVERNMENT HOUSE - MINISTRY OF LAND AND HOUSING - MINISTRY OF COMMERCE - DIRECTORATE OF EONOMIC EMPOWEERMENT - DUTSE CAPITAL DEVELOPMENT AUTHORITY - CABINET OFFICE - MINISTRY OF INFORMATION - MINISTRY OF AGRICULTURE - MINISTRY OF WOMEN AFFAIRS - OFFICE OF THE HEAD OF SERVICE - SUBEB - MINISTRY OF JUSTICE - MINISTRY OF FINANCE AND ECONOMIC PLANNING - JIGAWA STATE COLLEGE OF ISLAMIC & LEGAL STUDIES, RINGIM - BINYAMINU USMAN POLYTECHNIC, HADEJIA - MINISTRY OF ENVIRONMENT - JIGAWA STATE COLLEGE OF EDUCATIO, GUMEL - JIGAWA STATE INFORMATICS INSTITUTE, KAZAURE
JIGAWA STATE GOVERNMENT
DUE PROCESS & PROJECTS MONITORING BUREAU END OF YEAR REPORT JANUARY-DECEMBER, 2017
1.00 EXECUTIVE SUMMARY. In a presentation made by His Excellency, Muhammad Badaru Abubakar, MON, mni, the Executive Governor of Jigawa State, during the Year 2018 Appropriation Bill submission to the Jigawa State House of Assembly, dated 28th November,2017, He described the budget performance of 80% as satisfactory by any standard especially when compared against overall expenditure performance of 61% during the same period last year. He further explained ‘The sum of N129.87 billion was originally appropriated for 2017 Fiscal Year which was followed-up with Supplementary Appropriation of N12.1 billion. The latter was in respect of receipt of N7.1 billion from the Paris Club Refunds and the drawdown of N5.0 billion Commercial Agriculture Credit Facility approved by the House. While performance varied amongst the various revenue components, taking into account actual revenue receipt at the end of November, it was projected that the total revenue during the entire year would be almost N113.8 billion which is about 88% of the total income under the 2017 Appropriation. Even though this is slightly below the approved estimate, considering the prevailing circumstances, this is not bad a performance at all’. The Due Process and Projects Monitoring Bureau as the organ responsible for monitoring the implementation of capital projects and publication the details of major contracts, hereby present the end of year 2017 report. The report consists of four sections, which include Pre-contract Evaluations, Contracts Awarded, Completed and On-going Projects within the period under review.
2.00 PRE-CONTRACT EVALUATIONS During the period under review projects worth N23,706,083,831.07 only were submitted for vetting out of which the Bureau recommended N22,765,022,041.84 only for execution, thereby saving N941,061,789.22 only (0.039%) in favor of the government which is slightly lower than the previous year. 3.00 CONTRACTS AWARDED The sum of N67.48 billion was budgeted for capital expenditure, for both on-going projects and new ones, representing 51.96% of the total budget this year. Projects worth N11,346,722,830.30 representing 16.81% of total capital budget provision were awarded in the year 2017 which is less than the previous year 2016 by about N15.00 billion. This is due to the economic realities prevailing during the year and efforts being made to reduce the quantum of outstanding liabilities inherited. In line with best practice, at least 80% of the total contracts awarded should be by Open Competitive Process; however only 272No contracts worth N7,639,293,815.64 only, representing 67.33% of the total, were awarded by this process. While those awarded by Selective and Nominative tender process record 0.83% and 31.84% respectively. This performance is comparable with that obtained in the previous year and need to be enhanced in the successive years ahead. Furthermore, the percentage of the indigenous contractors that secure contracts in the state exceed 50%, which translate in not less than 50% of the total value of contracts awarded within this reporting period, thereby enhancing socio economic activities in the state. This was due to the fact that not much mega projects were awarded to allow for those on-going to be completed and paid for accordingly. 4.00 POST CONTRACT EVALUATION Projects with contract value of N115.014 billion have been reported under this section. Most of the projects, at various stages of completion, were carried forward from the previous years as ongoing and yet to be completed due to funding problems. Currently some of the projects, being reported upon (29.7%) have reached completion stage, others ongoing (69.3%) and the balance (1.0%), stagnant.
5.00 COMPLETED PROJECTS This section contains details of completed projects worth N34,193,891,012.40 only (29.7%) out of the N115.014 billion contracts been reported .It is on record that the country has experienced recession at a particular period within the year, as such funding was a problem to allow for completion of major capital projects nationwide. However, with the exit from the recession period it is hoped that there will be a lot of improvement on performance in the successive years to come. 6.00 ON-GOING PROJECTS The value of on-going projects, including stalled, being reported under this section, amounts to N80,820,679,677.34 only (70.3%) of the total contracts under consideration. The present administration is trying its very best to effect payment on all contracts awarded from 2016 to date and claims from contractors were paid within thirty working days of presentation at the finance Ministry. However, as the state exit from recession, the performance on the on-going projects will improve and better result will be recorded. 7.00 OBSERVATIONS Despite the fact that the country is now out of recession and there is some enhancement from the federation in terms of bail-out, the implementation of new capital projects has slightly drop due to payment of inherited liabilities and capital commitment from the previous administration. Total value of contracts awarded in 2016 was N26.65 billion which represent 37.37% of approved capital budget, while in 2017 it stands at N11.34 billion which represent 16.81% of 2017 approved capital budget respectively. In spite of the level of transparency in the award of contracts which stand at 67.30%, by open competitive process, compared with other methods approved by law, i.e. selective (0.86%) and nominative (31.84%) respectively, it is still below the best practice threshold of 80%. The present administration is always prompt in payments of contracts currently awarded, thereby attracting more patronage from investors/ registered companies into the state. The law provision, which requires that all contracts, the value of which is above N100.00 million, a performance bank guarantee must be presented, is yet to take effect despite several reminders forwarded by the Bureau to government.
The use of Standard Bidding Document (SBD) by agencies during tender process is also yet to be complied with in full, despite extensive training and revision of the existing document conducted by Partnership to Engage, Reform and Learn (PERL)-Accountable, Responsive and Capable Government (ARC), and emphasis made by the Bureau to achieve compliance with best practices as provided by law. 8.00 CONCLUSION/ RECOMMENDATION In conclusion, we congratulate the current administration in the way it is managing the meager resources of the state and spreading developmental projects across all constituencies in the state and making frantic effort to complete all on-going projects and settle outstanding liabilities inherited, as promised. Finally, the following recommendations were proffered to improve performance and decision making; • Government is advised to make its debt profile public, as per provisions of Fiscal Responsibility Law, so that efforts being made to off-set it could be appreciated by all, despite economic realities. • All efforts should be made to ensure that projects whose value exceed N100 million were awarded by Open Competitive process unless where necessary to observe otherwise, to improve the level of open competitive tendering process above 80% as per best practice. • Government to ensure that a provision was inserted in the council award letters that confirm the necessity to present performance guarantee of not less than 10% the valued of contract awarded , in excess of N100 million, as per provision made in the State Procurement Guidelines. This will enhance performance of on-going projects and ensure that they are completed within the stipulated time agreed.
• Government need to approve the submitted Standard Bidding Documents (SBD), presented by the Bureau, to ensure full compliance by all MDAs, as per best practice. • Government should direct all MDAs to proffer more ways to improve the state revenue base with a view to, at least, upset the recurrent expenditure requirement, accordingly. • Details of payments and releases on capital projects to MDAs and contractors need to be copied to the Bureau to improve its information base by the treasury department. The ministry of finance is called upon to ensure the completion and implementation of capital projects data base initiated by SPARC. ………………………………….. ……………………..... ALH. IBRAHIM BABA CHAICHAI ADO HUSSAINI MON SPECIAL ADVISER DIRECTOR GENERAL.
SECTION ( B )
CHARTS
JANUARY TO DECEMBER, 2017
PROJECTS BEING EXECUTED BY MINISTRIES/AGENCIESJANUARY-DECEMBER, 2017
ENVIRONMENT LAND & HOUSING Min. of Justic
GOVT. HOUSE FINANCE HEAD OF SERVICE
WOMEN AFFAIRS CABINET OFFICE COMMERCE
ECONOMIC EMPOWERMENT
66,252,432,482.20
2,909,305,115.67
25,205,628,414.45
9,539,815,204.72
5,013,314,824.22
744,887,264.60 1,209,381,562.23
WORKS &TRANSPORT
WATERRESOURCES
DCDA EDUCATION HEALTH AGRICULTURE INFORMATION
PROJECTS BEING EXECUTED BY MINISTRIES/AGENCIESJANUARY-DECEMBER, 2017
WORKS & TRANSPORT WATER RESOURCES DCDA
EDUCATION HEALTH AGRICULTURE
INFORMATION
108,822,854.32
14,754,828.72
229,843,611.50
20,467,308.07
49,793,055.32
PROJECTS BEING EXECUTED BY MINISTRIES/AGENCIESJANUARY-DECEMBER, 2017
JSCI &LS Ringim SUBEB BU Poly Hadejia JSCOE Gumel INFORMATIC Kazaure
34,193,891,012.40 , 30%
80,820,679,677.34 , 70%
ANALYSIS OF PROJECTS PERFORMANCE JANUARY-DECEMBER, 2017
Completed On-going
SECTION ( C )
PRE-CONTRACT EVALUATION
JANUARY TO DECEMBER, 2017
Pre-contract Evaluation
S/N PROJECT IN PROCESS QUOTED SUM DPPM RECOMMENDED SAVING/ REMARKS
(N) COST (N) INCREASE
MINISTRY OF HEALTH
1 Proposed construction of (30NO.) Proto ty pe basic health Clinic (BHC) across the state 1,005,380,280.30 957,087,195.30 48,293,085.00 Min of Health
2
Renew al of Contract on Cleaning serv ices at Rasheed Shekoni Special ist Hospital Dutse by MESSRS: Al-
hussad Tow n cean. 14,758,250.00 14,758,250.00 - Min of Health
3 Proposed supply of funiture to school of nursing Hadejia. 51,581,193.00 47,076,618.00 4,504,575.00 Min of Health
4
Renew al of contract on landscaping and garden maintenance at college of nursing and midw ifery Birnin kudu by
MESSRS: Dan Asabe Muhammad General v entures 7,308,000.00 7,308,000.00 - Min of Health
5
Proposed Supply of Office Equipment, Furnitures, Electronics, Accessories and consumables for sav e one Million
liv es. 10,434,037.50 8,608,110.00 1,825,927.50 Min of Health
6 General Renov ation /Improv ement and Water scheme at K/Hausa General Hospital (Variation /Fluctuation) 35,745,150.74 15,230,189.96 20,514,960.78 Min of Health
7 General Renov ation /Improv ement and Water scheme at Jahun General Hospital (Variation /Fluctuation) 15,130,922.71 13,278,686.28 1,852,236.43 Min of Health
8
Proposed 200 Metres Ex tension of cov ered Walkw ay to Link the new ly Constructed Structure at K/Hausa
General Hospital. 12,039,149.85 11,843,451.34 195,698.51 Min of Health
9
Proposed Supply of (3NO.) Vehicle,(100,000 Piecies) oflong lasting insectcide nets and (104,200) units of HIV test
kits. 102,390,000.00 99,335,250.00 3,054,750.00 Min of Health
10 General Renov ation /Improv ement of Fagam P.H.C. (Variation /Fluctuation) 6,918,733.71 6,548,882.59 369,851.12 Min of Health
11 General Renov ation /Improv ement of Taura P.H.C. (Variation /Fluctuation) 9,512,717.24 8,470,328.99 1,042,388.25 Min of Health
12 Renew al of Insurance cov er in respect of Jigaw a Medicare supply company (JIMSO) 926,317.12 926,317.12 - Min of Health
13 Proposed Dev elopment of Specialist Hospital at Hadejia 1,655,396,503.11 1,634,964,995.94 20,431,507.17 Min of Health
14 Renew al of contractfor Fire and Motor Vehicle Insurance cov er at Rasheed Shekoni Specialist Hospital Dutse 4,992,806.64 4,992,806.64 - Min of Health
15 Proposed general renov ation and maintenance w ork at College of Nursing and Midw ifery Birnin kudu 18,505,231.21 13,893,815.76 4,611,415.45 Min of Health
16 Proposed general renov ation at Primary Health Clinic Malam madori 52,515,467.88 48,915,797.04 3,599,670.84 Min of Health
17 Proposed general renov ation (Phase II) at Babura General Hospital. 53,397,544.22 46,967,714.72 6,429,829.50 Min of Health
18 Proposed construction of School of Midw ifery Babura 703,072,290.00 637,381,861.30 65,690,428.70 Min of Health
19 Proposed supply and installation of Solar pow ered lighting sy stem at Babura General Hospital. 24,524,784.38 20,984,971.88 3,539,812.50 Min of Health
20 Proposed supply and installation of Solar pow ered lighting sy stem at Gumel General Hospital. 35,067,178.12 30,263,168.13 4,804,009.99 Min of Health
21 Proposed construction of 30NO. Hand Pumps at 30NO. Basic Health Clinics in the State.(each) 881,995.86 800,887.50 81,108.36 Min of Health
22 Proposed renov ation/improv ement of Jigaw ar Dan Ali PHC Babura Local Gov t area. 4,570,981.99 4,563,864.59 7,117.40 Min of Health
23 Proposed renov ation/improv ement of Hadejia General Hospital. 106,068,079.17 101,725,900.85 4,342,178.32 Min of Health
24 Proposed upgrading of Gw aram Cottage to full pledged General Hospital. 99,258,576.78 100,842,569.19 (1,583,992.41) Min of Health
25
Supply and installation of 20KVA and 15KVA perking sound proof Generator (UK assembled) at Babura general
Hospital, Taura and Fagam PHCs. 9,397,500.00 8,947,500.00 450,000.00 Min of Health
26 Proposed supply of (1NO.) v ehicle 16,625,000.00 16,562,500.00 62,500.00 Min of Health
27 Proposed renov ation/improv ement of Fagam basic Health Clinic (additional w orks) 3,086,721.00 2,102,757.00 983,964.00 Min of Health
BAL. C/F 4,059,485,412.53 3,864,382,390.12 195,103,022.41
S/N PROJECT IN PROCESS QUOTED SUM DPPM RECOMMENDED SAVING/ REMARKS
(N) COST (N) INCREASE
BAL. B/F 4,059,485,412.53 3,864,382,390.12 195,103,022.41
28
Proposed procurement of airseparation (Ox y gen) Plant and Endoscopy Machine at Rasheed shekoni specialist
Hospital Dutse. 102,472,900.00 102,472,900.00 - Min of Health
29 Proposed supply and installation of Solar Pow ered Lighting sy stems in Dutse General Hospital. 32,435,221.87 27,835,303.13 4,599,918.74 Min of Health
30 Proposed supply and installation of Equipments to the new ly constructed 30NO. Basic Health Clinic across the State 109,776,420.00 109,776,420.00 - Min of Health
31 Proposed Renov ./Improv ement of Old ICT and Block ( D & E) male hostel at College of Health tech. Jahun 36,920,942.97 30,531,938.16 6,389,004.81 Min of Health
32 Proposed completion of new school of Nursing Hadejia 57,895,998.54 58,681,266.23 (785,267.69) Min of Health
33 Proposed ex tension of ex isting Wall fence height at Ringim General Hospital 7,844,520.38 7,599,406.45 245,113.93 Min of Health
34 Procurement of dialog ev o dialy sis Machine to Rasheed shekoni specialist hospital, Dutse 8,350,000.00 8,350,000.00 - Min of Health
35 Proposed renov ation of Gw iw a Primary Health Care (PHC) 10,819,583.50 9,878,404.40 941,179.10 Min of Health
36
Proposed procurement of 1NO.Hy undai creta ev alution Jeep (2016 model) to Rasheed shekoni specialist Hospital
Dutse 16,975,500.00 13,118,437.50 3,857,062.50 Min of Health
37 Proposed installation of (24NO.)new climeceiling fans in 40 bed w ard at Ringim General Hospital 745,700.00 687,400.00 58,300.00 Min of Health
38 Proposed renov ation/Improv ement of Dutse General Hospital 65,144,641.88 65,775,118.09 (630,476.21) Min of Health
39 Proposed Renov ation of Gujungu Primary Health Care 34,201,481.24 35,518,580.71 (1,317,099.47) Min of Health
40 Proposed Renov ationof Basirka Primary Health Care 17,132,437.01 14,766,348.45 2,366,088.56 Min of Health
41 Proposed Renov ation of Kany a Babba Primary Health Care 30,056,408.67 27,609,456.17 2,446,952.50 Min of Health
42 Proposed Renov ation of Roni Primary Health Care 26,282,890.99 26,766,366.64 (483,475.65) Min of Health
43 Proposed Renov ation of Kaugama Primary Health Care 30,636,788.92 35,574,703.10 (4,937,914.18) Min of Health
44 Proposed upgrading of Bulangu cottage to General Hospital 73,211,326.12 81,978,904.89 (8,767,578.77) Min of Health
45 Proposed upgrading of Kazaure Psy chiatric Hospital 48,603,680.99 48,714,143.91 (110,462.92) Min of Health
46
Contract for the Prov ision of cleaning serv ices at new ly constructed blocks (A&E, GOPD, male and female
amenity w ards) at Rasheed shekoni specialist hospital, Dutse. 5,760,000.00 4,800,000.00 960,000.00 Min of Health
47 Proposed construction of new General hospitals (3No.) at Buji, Garki and Guri Local Gov t head quarters (each) 461,330,785.51 469,714,568.51 (8,383,783.00) Min of Health
48 Proposed Supply of (36,571NO) long lasting insecticide treated nets for sav ing one million liv es project 31,999,625.00 31,999,625.00 - Min of Health
49 Proposed constr of w all fence at Kazaure Specialist Hospital 82,779,004.67 57,329,839.45 25,449,165.22 Min of Health
50 Supply of Equipment to Babura General Hospital 96,611,034.00 99,533,555.00 (2,922,521.00) Min of Health
MINISTRY OF WATER RESOURCES -
51
Proposed purchaseand installation of 11KW (15HP) v ertical booster at Takur site, Model Dan masara and Burtilan
w ater supply schemes Dutse 9,504,000.00 7,120,000.00 2,384,000.00 Min of Water
BAL. C/F 5,456,976,304.79 5,240,515,075.91 216,461,228.88
S/N PROJECT IN PROCESS QUOTED SUM DPPM RECOMMENDED SAVING/ REMARKS
(N) COST (N) INCREASE
BAL. B/F 5,456,976,304.79 5,240,515,075.91 216,461,228.88
52 Proposed rehabilitation of Takatsaba, Sabon gari "Ya "y a, Dogon marke, Tagw ay en fage w ater supply scemes 2,351,213.00 2,001,037.00 350,176.00 Stow a
53 Improv ement of Ringim w ater supply scemes (Additional w ork) 2,495,000.00 2,635,000.00 (140,000.00) Water Board
54 Proposed fencing of conv erted w ater supply sceme to solar at Ringim zone 1,411,852.00 1,279,625.00 132,227.00 Water Board
55 Proposed rehabilitation of 4NO. Water supply scemes (Kudai, Andaza, Makaddari and Abay a)
1,224,040.63 998,050.00
225,990.63 Stow a
56 Additional Work Improv ement of Ringim Water Supply Schemes 3,189,375.00 3,189,375.00 - Min of Water
57
Proposed conv ersasion of Motorised w ater pumps Stations (15NO.) to Solar Pow ered Sy stem w ith Hy brid
Inv erter Across the State
79,276,640.63 79,883,015.63
(606,375.00) Min of Water
58 Rehabilitation of Danladin Gumel, 'Yar gaba and Gamay in Water supply Schemes 3,198,300.00 2,850,750.00 347,550.00 Stow a
59 Improv ement of Babura Water Supply Schemes (Additional w ork) 56,186,968.79 56,563,431.19 (376,462.40) Min of Water
60 Request for Change of Contractor for the Construction of 7NO. Hand Pumps in Maigatari (Constituency Project) - Ruw asa
61 Improv ement of Gumel Tow n Water Supply Schemes (Variation /Fluctuation) 34,546,175.00 33,651,870.00 894,305.00 Min of Water
62 ProposedConstruction of Water Collection Point 1,346,817.00 1,312,811.54 34,005.46 Ruw asa
63 Improv ement of Ringim Water Supply Schemes (Phase II additional w ork) 37,278,239.91 52,090,958.59 (14,812,718.68) Min of Water
64
Request for the Conv ersion of Motorised Pumps Stations to Solar Pow ered Sy stem w ith Hy brid Inv erter Across
the State 76,305,954.75 65,622,247.03 10,683,707.72 Min of Water
65
Repairs of 650KVA Perkins Generator at Jekarde Water Works, Kazaure Zone, Improv ement of Kazaure Tow n
Water Supply 1,464,257.81 1,845,998.44 (381,740.63) Min of Water
66 Proposed Construction of w ater Pipeline from Cottage Hospital to Gw aram Sabuw a Tow n B/kudu Zone 41,596,222.50 37,456,335.00 4,139,887.50 Min of Water
67 Proposed Improv ement Works at Taura w ater Pump Stations 4,257,855.00 4,131,067.50 126,787.50 Min of Water
68 Request for the Change of Groundfos Submersible Pump to CRI Pump at Gumel Water Improv ement Project - Min of Water
69
Proposed Replacement of Submersible Pumps and Upgrading of Water schemes to Solar at Gagaraw a Tow n,
Gumel Zone 6,638,520.00 8,713,057.50 (2,074,537.50) Min of Water
70 Rehabilitation of Kany a Babba Water Supply Schemes, Babura zone 13,093,364.00 11,221,603.14 1,871,760.86 Stow a
71 Rehabilitation of Kudai and Albasu Water Supply Schemes, Dutse zone 2,138,587.50 1,933,837.00 204,750.50 Stow a
72 Conv ersion of Motorised to Solar Pow ered Water supply Scheme at Garki main Pump station 34,770,645.00 34,070,557.50 700,087.50 Water Board
73 Upgrading of small Tow n Water supply Scheme at Birnin kudu, Dutse, Ringimand Gumel zones. 96,305,581.10 89,434,800.00 6,870,781.10 Stow a
74 Proposed repair of 3NO. Vehicles 2,640,000.00 2,640,000.00 - Min of Water
75 Procurement of M & E equipment for bore holes sample analy sis 2,550,000.00 2,550,000.00 - Min of Water
BAL. C/F 5,961,241,914.41 5,736,590,502.97 224,651,411.44
S/N PROJECT IN PROCESS QUOTED SUM DPPM RECOMMENDED SAVING/ REMARKS
(N) COST (N) INCREASE
BAL. B/F 5,961,241,914.41 5,736,590,502.97 224,651,411.44
76
Proposed community mobilization, sensitization and establishment of Water consumers(WCA'S) in 132NO.
Communities across the State 6,034,000.00 4,970,000.00 1,064,000.00 Stow a
77 Proposed procurement of I.T. Office equipment 1,699,500.00 1,429,500.00 270,000.00 Min of Water
78
Proposed construction of completes Solar pow ered Watersupply scheme at 'Yan maulu Tow n in Babura Local
Gov t and conv ersion of Daba Tow n Watersupply Scheme in Kazaure Local Gov t. 14,149,931.25 14,255,587.50 (105,656.25) Stow a
79 Proposed procurement and replacement of Pumps at Malam madori Tow n Pump station 2,431,800.00 2,431,800.00 - Water Board
80 Improv ement of Hadejia Tow m Water supply Scheme 218,627,832.62 210,741,680.44 7,886,152.18 Water Board
81 Proposed conv ersion of Solar Water supply scheme in Sara Tow n Gw aram Local Gov t. 21,183,750.00 18,506,250.00 2,677,500.00 Stow a
82 Improv ement of Kiy aw a Tow n Water supply Scheme 37,608,346.59 38,571,055.11 (962,708.52) Water Board
83 Supply of Pumps and gen set at Roni Tow n Water supply scheme 7,537,687.50 7,378,750.00 158,937.50 Water Board
84 Improv ement of Taura Tow n Water supply Scheme 53,713,227.80 51,176,269.46 2,536,958.34 Water Board
85 Proposed rehabilitation of 11NO. Small Tow n Water supply across the State. 8,601,218.16 7,822,607.70 778,610.46 Stow a
86 Improv ement of Jahun Tow n Water supply Scheme 20,510,634.38 19,822,950.00 687,684.38 Water Board
87 Proposed rehabilitation of some ex isting Water supply scheme across the State. 12,797,268.75 13,626,955.13 (829,686.38) Stow a
88 Proposed Constr. of Hand pump Borehole and VIP Latrine 2,394,940.18 2,618,611.84 (223,671.66) RUWASA
89
Proposed Rehab of 17no. Hand pumps and Conv ersion of 2no. Open w ells to Handpumps at Jigaw a w ard,
Babura LGA.
1,320,410.00 1,121,851.50
198,558.50 RUWASA
90 Improv ement of Babura w ater Supply schemes (Rev ised Additional Work PHASEII) 83,058,120.81 78,358,920.45 4,699,200.36 Water Board
91 Proposed additional w ork for the improv ement of Gumel tow n w ater supply project (rev ised phaseII) 62,939,996.83 62,284,251.88 655,744.95 Water Board
92 Procurement of w ater pumps, starters at Dutse, Hadejia andKazaure zone 6,494,250.00 5,607,000.00 887,250.00 Water Board
93 Improv ement of Ringim w ater Supply schemes (PHASEII) 77,971,175.06 75,569,748.42 2,401,426.64 Min of Water
94
Prov ision of Solar Water supply scheme at proposed multi-purpose plastic w aste recy cling machine site
Danmasara, Dutse 8,810,711.44 8,078,141.53 732,569.91 Water Board
95
Proposed estimate for community mobilization, sensitization and establishment of Water consumers in 55NO.
Communities across the State 2,406,750.00 2,252,250.00 154,500.00 Stow a
96 Proposed procurement of (2NO.) 60KVA perkins Generators set 7,500,000.00 9,712,500.00 (2,212,500.00) Water Board
97 Proposed conv ersion of Zobiy a motorised Watersupply scheme to solar in Dutse local Gov t Area. 6,021,751.00 6,021,751.00 - Stow a
98 Rehabilitation of Garado and nine others Water supply scheme 6,752,600.00 5,540,850.00 1,211,750.00 Stow a
99 Proposed procurement and installation of 500KVA Transformer at Jekarade Water w orks Kazaure 5,705,000.00 5,391,400.00 313,600.00 Water Board
100 Proposed upgrading and conv ersion of Solar pow ered w ater supply schemes across the state (rev ised scope) 93,848,844.52 90,265,107.03 3,583,737.49 Stow a
BAL. C/F 6,731,361,661.30 6,480,146,291.96 251,215,369.34
S/N PROJECT IN PROCESS QUOTED SUM DPPM RECOMMENDED SAVING/ REMARKS
(N) COST (N) INCREASE
BAL. B/F 6,731,361,661.30 6,480,146,291.96 251,215,369.34
100 Proposed procurement of Ago diesel, chemicals and serv icing materials 919,349,730.88 938,767,914.00 (19,418,183.12) Min of Water
101 Rehabilitation of Jarkasa Water supply scheme of Gw aram LGA. 1,085,438.00 1,085,438.00 - Stow a
102 Proposed ov erhauling of (2NO) 20KVA Generating sets at Sule tankarkar pump station in Gumel zone
1,068,750.00 888,850.00
179,900.00 Water Board
103 Proposed replacement of submersible pumps, motors and repairs of Generating sets across the State
19,789,230.00 19,566,230.00
223,000.00 Water Board
104 Proposed 2017 General rehabilitation of Water supply schemes across the state 19,110,357.00 18,694,557.00 415,800.00 Stow a
105 Rehabilitation of Limaw a & Zobiy a Water supply scheme 1,160,250.00 1,027,000.00 133,250.00 Stow a
106 Rehabilitation of Kargon Garki, Gidan maza Water supply schemes. 2,191,625.00 1,991,600.00 200,025.00 Stow a
107 Rehabilitation of Solar Water supply schemes across the state 218,875,412.50 200,133,056.15 18,742,356.35 Stow a
108 Rehabilitation of Albasu, Bango, Ajura and Zazika Water supply 3,000,000.00 1,396,500.00 1,603,500.00 Stow a
109 Rehabilitation of Water supply scheme at Jigaw a small tow n in Babura LGA 29,558,485.00 27,530,537.49 2,027,947.51 Stow a
110Supply and installation of 2NO. 650KVA basic perkins (UK assembled) at Jekarade w ater w orks, Kazaure 50,700,000.00 66,228,750.00
(15,528,750.00) Water Board
111 Upgrading small tow n w ater supply scheme at B/kudu, Dutse, Ringim and Gumel zone 96,305,581.10 89,434,800.00 6,870,781.10 Stow a
112 Proposed upgrading and Rehab of Sara w ater supply scheme in Gw aram LGA 10,360,877.92 8,613,121.67 1,747,756.25 Stow a
MINISTRY OF EDUCATION -
113 Proposed renov ation of Modibaw a and Ladduga nomadic primary schools 10,986,423.76 6,836,373.28 4,150,050.48 Nomadic edu
114 Proposed construction of Library Phase II, renov ation of auditorium and furnishing auditorium. 161,437,831.70 154,639,143.16 6,798,688.54 B U Poly Hdj
115 Proposed procurement of ICT Materials. 2,727,767.00 2,866,500.00 (138,733.00) Library Board
116 Proposed procurement and apply of Termites and Bats control chemicals for 87No: Schools in the State 12,760,000.00 12,789,000.00 (29,000.00) Min of Education
117 Proposed procurement of (560NO.) 3-seater desksw ith back rest to v arious science schools. 9,640,000.00 8,469,440.00 1,170,560.00 Min of Education
118 Proposed procurement of (180NO) Double decker beds 5,571,000.00 5,175,000.00 396,000.00 Min of Education
119
Proposed installation of 40KVAGenerator set and connection of TDN lines at technical college Ringim and Kany a
babba science School. 9,582,123.15 731,400.95 8,850,722.20 Min of Education
120 proposed purchase of ICT materials to gov ernment science technical college Ringim. 53,813,000.00 67,896,780.00 (14,083,780.00) Min of Education
121 Price of Laptop Lenov o BSO-10 Computer 275,000.00 330,000.00 (55,000.00) Scholarship Board
122 Proposed establishment of fifty four (54) remedial and eighteen (18) continiung education centres across the State 32,400,000.00 32,400,000.00 - Mass Education
123
Proposed procurement of school uniforms,3-seaterdesk and double douckerbeds to v arious senior secondry
school across the stare 28,500.00 316,595,400.00 (316,566,900.00) Min of Education
124 Jigaw a State Univ ersity K/Hausa (Variation of Works on Lot II & III). 249,269,647.78 238,484,947.28 10,784,700.50 Min of Education
125 Proposed Procurement of Library Books 15,963,200.00 15,107,100.00 856,100.00 Biny aminu Usman Poly
126 Proposed Ex ternal Works for Female Hostel (Jigaw a State Univ ersity K/Hausa) (LotIII) 68,161,368.56 68,012,138.48 149,230.08 Min of Education
127 Rehabilitation of Proposed Business Admin Block at Hadejia Biny aminu Usman Poly technic 24,726,360.18 21,953,275.50 2,773,084.68 Biny aminu Usman Poly
BAL. C/F 8,761,259,620.83 8,807,791,144.92 (46,531,524.09)
S/N PROJECT IN PROCESS QUOTED SUM DPPM RECOMMENDED SAVING/ REMARKS
(N) COST (N) INCREASE
BAL. B/F 8,761,259,620.83 8,807,791,144.92 (46,531,524.09)
128 Proposed Procurement of Students Uniform and Protectiv e Clothing for Bamaina Acadamy 3,396,000.00 2,998,540.00 397,460.00 Bamaina Acadamy
129 Proposed Procurement of ICT Equipment for Information Institute Kazaure 1,053,000.00 895,000.00 158,000.00 Reseach Institute Kazaure
130 Proposed 2017 Capital project for Islamic college Ringim. 128,362,756.33 121,603,084.18 6,759,672.15 C O I A LS Ringim
131 ProposedProcurement of Toy ota Camry (2015 Model) 15,125,000.00 13,750,000.00 1,375,000.00 J S Poly
132 Proposed Prov ision of Wi-Fi and V-Sat Internet Serv ice at B U P Hadejia (Old and New Site) 4,870,556.26 4,723,154.50 147,401.76 Biny aminu Usman Poly
133 Proposed Manufacturing and Installation of Laboratory Furniture and Fittings Against NBTE Resource Inspection 21,721,875.00 13,768,125.00 7,953,750.00 Biny aminu Usman Poly
134
Construction of 1NO.Students Hostel at GUSS M/Madori Forw arding of Request for Variation/Fluctuation of
Contract 2,189,567.11 2,189,567.11 - Mass Education
135 Proposed 2017 Capital Project for Jigaw a State Poly technic, Dutse 56,488,293.84 55,537,526.20 950,767.64 Jigaw a State Poly
136
Variation/fluctuation for the Constr. Of Block of 3-Classes Block of Ten Rooms Students Hostel, Block of
Workshop and Block of Tw in Labouratories at GSTC Ringim 34,484,588.32 3,497,009.81 30,987,578.51 Science & Tech.
137 Proposed 2016 Capital Projects for JSCOE Gumel 41,157,224.63 42,513,249.63 (1,356,025.00) J S C O E Gumel
138 Proposed Purchase of ICT Materials to Gov t Sci Tech Coll Ringim 53,811,000.00 53,053,455.00 757,545.00 Sci & Tech Sch B
139 Basic and Post Literacy Program (Allow ance/Logistics) 19,440,000.00 19,440,000.00 - Mass Education
140 Proposed Procurement of Instructional Materials 10,514,938.00 9,757,049.40 757,888.60 Mass Education
141 Proposed Ronov ation of Laboratories and ICT centre at Some Schools in the state 35,890,074.87 41,627,160.11 (5,737,085.24) Min of Education
142 Proposed Renov ation Works at GUSS Kazaure (Change of Scope) 27,302,940.04 27,277,158.53 25,781.51 Min of Education
143 Proposed Conduct of New ly Introduced Musabaqar Ilimi 2017 10,338,000.00 10,472,900.00 (134,900.00) Isl Edu Bureau
144 Proposed Construction of 6-Seater Toilet and Procurement of Books 4,499,924.00 4,864,415.19 (364,491.19) Library Board
145 Proposed General Renov ation of Gov t Unity Commercial Sec Sch Takur Dutse 105,823,610.01 112,020,852.16 (6,197,242.15) Min of Education
146 Proposed and Distribution of Items for Nomadic Primary School 25,950,000.00 29,045,625.00 (3,095,625.00) Nomadic Education
147 Proposed Supply of Tools, Equipment, Machine and Practical Materials GSTC Hadejia and GSS Ringim 19,078,500.00 15,397,252.50 3,681,247.50 Science & Tech.
148 Proposed Procurement of Sci Laboratory Equipments to GSTC Hadejia, GSS Ringim and SSS Lautai 38,678,408.00 42,813,628.83 (4,135,220.83) Science & Tech.
149 Proposed 2017 Capital Projects for informatics Institute Kazaure 111,313,763.00 95,681,157.49 15,632,605.51 Informatic Kazaure
150 Proposed Procurement of 3-Seater Desks for senior Sec Sch in the State (each) 18,250.00 21,032.81 (2,782.81)
BAL. C/F 9,532,767,890.24 9,530,738,088.37 2,029,801.87
S/N PROJECT IN PROCESS QUOTED SUM DPPM RECOMMENDED SAVING/ REMARKS
(N) COST (N) INCREASE
BAL. B/F 10,131,042,383.25 10,114,459,504.42 16,582,878.83
174 Proposed procurement of Mini printing Machine. 12,000,000.00 12,000,000.00 - Sule Lamido Univ ersity
175
Proposed prov ision of 1200MBPS internet serv ice and installation for the e-Resource centre at the Univ ersity
permanent Site. 26,995,500.00 24,601,500.00 2,394,000.00 Sule Lamido Univ ersity
176 Proposed procurement of 36 No. motorcy cles for monitoring 6,900,000.00 6,548,000.00 352,000.00 Nomadic Education
177
ProposedFood order for feeding of (500NO.) Student and pupil in Boarding Primary and Secondry Schools per
w eek. 442,280.00 454,460.00 (12,180.00) Min of Education
178
Proposed construction of centre for education Technology complex at College of Islamic and Legal Studies
Ringim (additional w ork) 6,692,100.00 6,577,636.00 114,464.00 Legal Ringim
179 Proposed 2017 Capital Projects. 10,845,000.00 14,609,150.00 (3,764,150.00) Legal Ringim
180 Proposed construction of Wall fence and general renov ation of Offices 24,401,949.16 27,364,843.73 (2,962,894.57) Scholarship Boad
181
Proposed procurement and installation of Solar pow er sy stem capable of Generating 1.5KVA for 6Hours/day (1
set) at some selected Senior Secondry Schools across the State (8no.)
8,499,750.00 6,125,490.00
2,374,260.00 Min of Education
182
Proposed procurement of kitchen utensils for distribution to v ariuos Senior Secondry Schools across the State
(8no. Location)
9,546,000.00 8,340,000.00
1,206,000.00 Min of Education
183
Contract v ariation due to fluctuation of material cost for the General renov ation of 6NO Junior staff quarters at G. G.
A. S. S. Danzomo by MESSRS: Mojaz constraction Ltd (LOT 21)
11,631,254.88 2,324,232.90
9,307,021.98 IEB
184
Contract v ariation due to fluctuation of material cost for the General renov ation of 6NO Junior staff quarters at G. G.
A. S. S. Danzomo by MESSRS: Mojaz constraction Ltd (LOT 22)
11,631,254.88 2,324,232.90
9,307,021.98 IEB
185
Proposed procurement of customized instructional, entrepreneurship/trade materials, and facilitators allow ances for
the implementation of female Teacher dev elopment scheme 4,498,875.00 4,326,400.00 172,475.00 Min of Education
186 Proposed procurement of instruction materials 4,906,912.50 4,906,912.50 - Agency for Mass Educ.
187 Actionplan for w omen functional v ocational education facilitators monthly allow nces (9 months) 4,860,000.00 4,860,000.00 - Agency for Mass Educ.
188 Proposed procurement of instructional materials (rev ised scope) 10,200,000.00 13,387,500.00 (3,187,500.00) Nomadic Education
189 Proposed improv ementof the school of preliminary studies (Phase II) (construction of w all fence) 338length 11,209,612.06 10,987,398.99 222,213.07 Sule Lamido Univ ersity
190 Propose purchase of Library Books and accreditation ex ercise 7,131,500.00 6,695,500.00 436,000.00 Informatic Inst. Kazaure
191 Proposed procurement of Laboratory equipment, Office v ehicle and Renov ation w orks 50,425,623.78 49,096,147.42 1,329,476.36 Informatic Inst. Kazaure
192 Propose purchase of (5NO.) utility v ehicles 41,067,124.89 41,067,124.89 - Sule Lamido Univ ersity
193
Proposed renov ation of classrooms at sais Hadejia and Students Hostel at Biny aminu Usman Poly technic old
campus, Hadejia 63,856,780.95 47,685,752.59 16,171,028.36 Biny aminu Usman Poly
194 Proposed conduct of 2017 QUR'ANIC recitation competition 20,147,500.00 18,968,300.00 1,179,200.00 IEB
195 Proposed construction w orks 37,359,590.72 41,340,785.75 (3,981,195.03) IEB
196 Proposed renov ation of Gov ernment Girls unity secondry school Kazaure 51,745,166.29 49,732,107.72 2,013,058.57 Min of Education
197 Proposed construction of 5NO. Hand Pumps 2,975,000.00 2,975,000.00 - Gifted Sch. Bamaina
198 Proposed procurement of sporting equipment, kitchen utensils and others. 1,976,250.00 1,938,750.00 37,500.00 Gifted Sch. Bamaina
BAL. C/F 10,572,987,408.36 10,523,696,729.81 49,290,678.55
S/N PROJECT IN PROCESS QUOTED SUM DPPM RECOMMENDED SAVING/ REMARKS
(N) COST (N) INCREASE
BAL. B/F 10,572,987,408.36 10,523,696,729.81 49,290,678.55
MINISTRY OF WORKS -
199 Proposed procurement of instructional materials 1,969,727.00 1,911,727.00 58,000.00 Gifted Sch. Bamaina
200 Proposed construction of 4NO. Classrooms block up stair, line drainage, fence and gate at Dutse capital school 32,170,996.00 29,121,858.04 3,049,137.96 Dut Model Int School
201 Proposed rehabilition and connecting of the ex isting street and scurity lights at federal Secretariat Dutse 7,630,710.15 7,630,710.15 - Min of Works
202 Rilocation of electrical instalations affected by the project (construction of Roni tow nship) 2,495,010.00 2,265,375.00 229,635.00 Min of Works
203 proposed design and construct 2 span conv entional bridge(30M long ) on Gw aram-Basirka Road 321,177,249.75 292,696,945.76 28,480,303.99 Min of Works
204 Relocation of electrical instalations affected by the project (construction of Guri tow nship Roads) 3,724,647.50 3,648,885.00 75,762.50 Min of Works
205 Relocation of electrical instalations affected by the project (construction of Kazaure tow nship Roads) 5,495,007.50 5,376,320.25 118,687.25 Min of Works
206 Relocation of electrical instalations affected by the project (construction of Mai Gatari tow nship Roads) 4,541,968.15 3,723,500.00 818,468.15 Min of Works
207 Relocation of electrical instalations affected by the project (construction of Hadejia tow nship Roads)
13,050,678.13 13,264,954.13
(214,276.00) Min of Works
208 Proposed erosion control at Koray al and Koramar Rorau Bridge. 2,173,667.00 2,173,667.00 - State Road Main Ag
209
Proposed desilting of Drainages and culv erts at Diutse, Birniw a, Jahun and Babura Local Gov ernment Head
Quarters
17,343,902.40 16,896,752.20
447,150.20 Jisepa
210 Proposed ex tension low tension (L.T) line from Police Barrack to Magistrate court in Babura 1,711,580.00 1,548,260.00 163,320.00 Electricity Board
211 Stand Alone SolarStreet LightingProject old Police Headquarter Garu Dutse (32no. Additional units) 20,912,237.64 19,196,100.00 1,716,137.64 Min of Works
212 Recolection of Water Pipelines Affected by the Project Construction of Kazaure Tow nship Road 24,540,790.00 24,302,390.00 238,400.00 Min of Works
213 Proposed Construction of Additional (4NO.) Culv erts at Taura Tow nship Road 2,912,742.00 3,566,115.00 (653,373.00) JIRMA
214 Proposed Ex tension of Electricity at Bello Bay i, Agumau and Maman w ale Ex tension Hadejia 48,619,269.93 50,746,396.06 (2,127,126.13) REB
215 Proposed Purchase of (35NO.) Gasline Generator for Distribution to Mosques in Hadejia Constituency 3,491,250.00 3,491,250.00 - REB
216
Proposed Deploy ment of (6NOS) 30KVA, Repairs of 500KVAand Purchase & Installation of 150KVA Sound Proof
Generators to gov ernment buildings.
19,688,302.50 19,113,298.50
575,004.00 REB
217 Proposed Maintenanceof Basirka Bridge on Basirka Darazo Road 2,376,585.75 2,226,829.50 149,756.25 JIRMA
218 Proposed Reclamation of Eroded Area and Construction of Drainage at Gujaba Village, Chaichai Ringim Road 5,252,499.00 4,621,155.00 631,344.00 JIRMA
219
Proposed Reclamation of Eroded Portion and Construction of Line Drain at Majia tow n, Gujungu to Ringim Road
1,514,712.00 1,746,068.61 (231,356.61) JIRMA
220
Proposed Additional Drainages Works (Drains Off Shoots to Pits Roads 3,4,5 & 6 Construction of Hadejia
Tow nship 199,191,029.00 177,848,368.32 21,342,660.68 Min of Works
221
Proposed Maintenance of Road Shoulder at Kw arin Makera along Kachi-FanisauRoad in Dutse Local Gov t. Area
(JIRMA) 2,774,077.43 2,627,072.70 147,004.73 Min of Works
222 Proposed Rehabilitation of Makaddari to Shay y a ITC Lines in M/Madori L.G.A. 8,291,563.10 8,232,658.10 58,905.00 REB
223
Proposed Construction of Reinforced Concrete Line Drainages and Culv ert (620m)at Dantanoma (Lay in
Transformer)in Gumel Tow n 14,658,653.68 20,891,855.91 (6,233,202.23) Min of Works
BAL. C/F 11,340,696,263.97 11,242,565,242.04 98,131,021.93
S/N PROJECT IN PROCESS QUOTED SUM DPPM RECOMMENDED SAVING/ REMARKS
(N) COST (N) INCREASE
BAL. B/F 11,340,696,263.97 11,242,565,242.04 98,131,021.93
224
Relocation of Solar Pow ered Pumps w ater facility Affected By the Project Construction of Kazaure Tow nship
Roads 1,536,285.82 1,229,932.19 306,353.63 Min of Works
225
Construction of Kw anar Dundu-Bulangu Road (Upgrading From 2nd Coat Surface Dress Road toAsphaltic Concret
Ov erlay ) (additional w ork) 992,067,536.25 1,135,326,386.25 (143,258,850.00) Min of Works
226 Proposed Construction Kaugama-Turmi Gujungu feeder Road (21KM) 434,434,444.92 389,684,446.20 44,749,998.72 Min of Works
227 Proposed Maintenance of Hy draulic Structures of Hantsu-Miga-Dangy atin Road (JIRMA) 9,393,210.75 10,285,380.00 (892,169.25) Min of Works
228
Proposed Maintenance and Construction of Drainage Along B/kudu-Jiboga Road and Zarainaw a Quarters in
B/kudu Local Gov t Area 216,203,557.50 197,831,938.50 18,371,619.00 Min of Works
229 Relocation of Electrical Installations Affected by the Project (Construction of M/Madori Tow nship Roads 5,597,822.50 4,803,670.70 794,151.80 Min of Works
230 Relocation of Pipe Reticulation /Borehole Affected by the Road Project at Kore Tow n 3,626,262.00 3,742,172.00 (115,910.00) Min of Works
231 Relocation of Water Pipelines Affected by the Project (Construction of M/madori Tow nship Roads) 11,220,313.17 8,696,597.32 2,523,715.85 Min of Works
232 Relocation of Water Pipelines Affected by the Project (Construction of Guri Tow nship Roads) 16,278,258.05 13,606,376.95 2,671,881.10 Min of Works
233 Relocation of Electrical Installations Affected by the Project (Construction of K/Hausa Tow nship Roads) 3,071,929.33 2,721,929.33 350,000.00 Min of Works
234
Change of Scope (Supply and Installation of (100 Unit) Stand Alone Solar Street Lighting at Kany a Babba and old
Police Headquater-Garu Dutse 63,283,500.00 63,283,500.00 - Min of Works
235 Proposed procurement of 1NO. 75KVA Generator for Gov ernors Officials lodgeat Ikeja G.R.A. Lagos 3,900,000.00 3,700,000.00 200,000.00 Min of Works
236 Proposed construction of Harbo Road (1.52KM) 220,689,099.49 166,462,827.79 54,226,271.70 Min of Works
237 Construction of Malam madori Tow nship Road (additional w orks) 386,561,885.85 374,134,938.89 12,426,946.96 Min of Works
238 Proposedex tension of Electricity at Andaza Tow n, Kiy aw a Local Gov ernment area 31,721,329.31 31,721,329.31 - REB
239 Proposed rehabilitation and upgrading of Aujara access Road (1.65KM) 96,265,876.22 96,860,399.34 (594,523.12) Min of Works
240
Proposed construction of reinforced concrate Block line Drainage and Culv ert at Aujara Bakin kasuw a and Tsigi
(1650M) 63,742,171.31 63,238,372.91 503,798.40 Min of Works
241 Proposed electrification Project at Katurje in Kafin hausa Local Gov ernment Area 11,020,422.65 10,916,014.48 104,408.17 REB
242 Proposed integrated stand-alone Solar street Lighting (130No) project at Jigaw a Dan ali, Babura L.G.A. 84,691,365.41 82,515,030.41 2,176,335.00 Min of Works
243 Proposed integrated stand-alone Solar street Lighting (150No) project at Jahun L.G.A. 97,695,363.94 95,192,688.94 2,502,675.00 Min of Works
244 Proposed integrated stand-alone Solar street Lighting (150No) project at Danzomo, Sule Tankarkar L.G.A. 84,691,365.41 82,515,030.41 2,176,335.00 Min of Works
245 Proposed Potholes patching along Sara-Gantsa-Girinbo Road, Buji Local Gov t Area 22,287,616.30 21,061,451.25 1,226,165.05 JIRMA
246 Relocation of Electrical installations affected by the construction of Roni Tow nship Roads 827,775.00 649,425.00 178,350.00 Min of Works
247
Proposed ex cav ation and concrate filling of ongoing Water reticulation in Gumel, Banura and Ringim
carriagew ay s 1,254,823.16 1,254,823.16 - JIRMA
248 Relocation of Water Pipelines affected by the construction of Maigatari Tow nship Roads 9,623,488.35 9,177,535.50 445,952.85 Min of Works
249 Relocation of Water Pipelines affected by the construction of Jahun Tow nship Roads 8,882,910.00 8,028,307.50 854,602.50 Min of Works
BAL. C/F 14,221,264,876.66 14,121,205,746.37 100,059,130.29
S/N PROJECT IN PROCESS QUOTED SUM DPPM RECOMMENDED SAVING/ REMARKS
(N) COST (N) INCREASE
BAL. B/F 14,221,264,876.66 14,121,205,746.37 100,059,130.29
250 Relocation of Water Pipelines affected by the project (construction of RoniTow nship Roads Phase II) 2,025,700.00 1,756,702.00 268,998.00 Min of Works
251
Proposed electrification Project to Gurunga/Maja tow n in 29 Constituency across the State (Additional No.30)
(Dutse) 36,909,496.48 36,920,790.22 (11,293.74) REB
252 Maintenance of failed spots on Malam madori-Dolenkw ana-Birniw a and Dolenkw ana-G/Gabas-Hadejia Roads 2,272,725.00 2,013,375.00 259,350.00 JIRMA
253 Maintenance of failed spots on Kw anar-Roni-Roni-Takw ardaw a Road 1,428,196.00 1,282,160.25 146,035.75 JIRMA
254 Proposed electrification Project at Gw iw a and Kafin hausa Local Gov ernment Area 52,045,049.59 50,745,578.65 1,299,470.94 JIRMA
255 Proposed rehabilitation of Karnay a-Dundubus ITC line Dutse Local Gov ernment Area 5,357,383.00 5,114,056.50 243,326.50 REB
256 Proposed electrification Projects to (No.29) Tow n in 29 Constituency across the State 1,219,203,181.43 1,214,311,482.00 4,891,699.43 REB
257 proposed procurement of Uniform materials, protectiv e Clothes and accessories. 3,840,000.00 3,840,000.00 - Fire Serv ice
258 Proposed construction of Limaw a-Galamaw a Feeder Road (2.2KM) (Dutse L.G.A.) (upgrading) 89,212,318.25 87,185,923.24 2,026,395.01 Min of Works
259 Proposed construction of Takur-Jaudi Feeder Road (4.5KM) (Dutse L.G.A.) (new ) 101,585,893.50 78,896,311.20 22,689,582.30 Min of Works
260 Proposed supply and installation of stand-alone Solar street Lighting at state Secretariate, Dutse. 33,361,650.00 33,361,650.00 - Min of Works
261 Proposed supply and installation of stand-alone Solar street Lighting at Commisioner's Quarters. 33,361,650.00 31,773,000.00 1,588,650.00 Min of Works
262 Proposed Reconstruction and ov erlay of Gadadin Junction-Kachi Road (0.25KM), Dutse 36,359,415.86 26,733,168.63 9,626,247.23 Min of Works
263 Re-construction and ov erlay of Unity pentagon round about-Dasina Junction Road (0.5KM). 71,493,548.49 70,942,298.85 551,249.64 Min of Works
264 Construction of perimeter Road, runw ay ex it and access Road to apron, Dutse Air port. 998,537,518.00 698,813,272.86 299,724,245.14 Min of Works
265 Proposed replacement of 1NO. Transformer at Kafin Fulani in Gw aram Local Gov t Area 5,727,121.29 4,515,627.86 1,211,493.43 REB
266 Erosion control at Koray al and Koramar Rorau Unguw ar Mani - Koray al Road 12,164,294.63 12,164,294.63 - JIRMA
267 Proposed repair of Toy ota Hilux (JG10-G01) 522,500.00 450,000.00 72,500.00 JIRMA
268 Proposed repair of (6NO.) fire fighting Vehicles and Ambulance 4,126,100.00 4,126,100.00 - Director Fire Serv ice
269 Proposed relocation of Electrical installations affected by the M/madori tow nship road project. 9,009,200.00 7,365,900.00 1,643,300.00 Min of Works
270 Proposed construction of Failed section along Jahun Gujungu Road. 195,476,043.13 175,792,455.30 19,683,587.83 JIRMA
271
Proposed construction of reinforce concrete line Drainages and Culv ert (600m) at Dantanoma (Lay in transformer)
in Gumel tow n (PHASE II) 24,290,347.76 24,290,347.76 - Min of Works
272
Proposed construction of line Drain (2.56KM), ring Culv ertand access slabs at Gida dubu Yadin Dutse in Dutse
Local Gov t Area 96,606,796.61 96,606,796.61 - JIRMA
273
Proposed construction of reinforce concrete line Drainages and Culv ert (620m) at Dantanoma (Lay in transformer)
in Gumel tow n. (phase 1) 18,993,645.65 18,993,645.65 - Min of Works
274 Proposed maintenance of Kaugama Fly ov er 7,755,562.50 7,687,302.00 68,260.50 JIRMA
275 Desilting of lineDrain at Danzomo, Kanar Med u- Danzomo Road. 1,178,541.00 1,091,748.52 86,792.48 JIRMA
276
Proposed Tow nship Electrification distribution netw ork and inter Tow n connections at Nasaraw a, Karkasara
Quarters and Mai dubara to G/Malam inGumel L.G.A. 104,307,151.22 84,651,885.99 19,655,265.23 REB
277 Relocation of Water Pipelines affected by the project. (construction of Roni tow nship Roads) 1,788,357.50 1,879,455.38 (91,097.88) Min of Works
BAL. C/F 17,390,204,263.55 16,904,511,075.47 485,693,188.08
S/N PROJECT IN PROCESS QUOTED SUM DPPM RECOMMENDED SAVING/ REMARKS
(N) COST (N) INCREASE
BAL. B/F 17,390,204,263.55 16,904,511,075.47 485,693,188.08
278 Proposed Urban Tow ns Streetlight installations monthly maintenance supplies. 88,823,200.00 88,171,250.00 651,950.00 Min of Works
279 Relocation of Water Pipelines affected by the project. (construction of Hadejia tow nship Roads) 18,632,806.75 18,149,884.21 482,922.54 Min of Works
280 Proposed Electrification Rehabilitation of ITClines across the 12 Villages in Kafin Hausa L.G.A. 8,162,148.85 10,773,425.00 (2,611,276.15) REB
281 Rehab of Gumel - Gujungu road 16,545,060.00 17,137,260.00 (592,200.00) JIRMA
MINISTRY OF ENVIRONMENT -
282 Proposed seedling production activ ities. 11,129,000.00 11,084,250.00 44,750.00 Min of Env ironment
283 Proposed clearanceof thy pha grass along riv er Hadejia 11,291,500.00 11,291,500.00 - Min of Env ironment
284 Proposed seedling production activ ities. 8,821,800.00 8,933,198.00 (111,398.00) Min of Env ironment
285 Proposed construction of w all fance at Hadejia Nursery . 8,927,237.34 8,839,037.45 88,199.89 Min of Env ironment
286 Proposed Construction of 3NO. Drainages in the State 46,729,691.63 69,126,837.85 (22,397,146.22) Min of Env
287 Proposed Workshop on Conv ersion of Municipal and Agricultural Waste to Health 1,390,000.00 1,286,000.00 104,000.00 Min of Env
288 Proposed Malaria v ector control at G/dugus and Wangara Wards in Dutse Local Gov t Area 809,400.00 778,200.00 31,200.00 Min of Env ironment
289 Proposed construction of Drainage at Sabon gari Quarters in Birnin kudu Local Gov t Area 34,367,855.92 32,461,026.92 1,906,829.00 Min of Env ironment
290
Proposed construction of Drainage at Dumadumin toka, Kafin hausa Local Gov t Area. (Constituency project 2017). 26,012,710.64 25,333,736.01
678,974.63 Min of Env ironment
291 Proposed procurement of 1NO. Utility Vehicle. 10,000,000.00 18,500,000.00 (8,500,000.00) Min of Env ironment
292
Proposed procurement of Malaria/Vector control accessories for use at 14NO. L.G.A. across the State 4,995,400.00 4,855,400.00
140,000.00 JISEPA
293 Proposed flood and erosion control at Ashuran Chiroma Tow n, Kafin hausa Local Gov t Area. 28,744,809.02 21,101,815.80 7,642,993.22 Min of Env ironment
294 Proposed construction of Drainage at Achauy a Tow n in Sule tankarkar Local Gov t Area. 12,017,528.27 12,017,528.27 - Min of Env ironment
295 Proposed Moringa Oliefera Seedling (NO. 500,000) 10,278,100.00 8,402,600.00 1,875,500.00 Min of Env ironment
296 Proposed flood and erosion control at Chamo, Galamaw a and Garu in Dutse Local Gov t Area. 179,962,777.00 179,962,777.00 - Min of Env ironment
297 Proposed construction of Drainage at Babaldu and Zango Kw arin aw aja in Birnin kudu Local gov ernment 42,716,398.15 56,839,408.01 (14,123,009.86) Min of Env ironment
298
Proposed construction of Drainage (1.53KM both sides at Yalleman Tow n in Kaugama L.G.A. (constituency
project).
56,839,408.01 56,839,408.01
- Min of Env ironment
299
Proposed construction of Drainage (Phase II) at Basirka Tow n, Fagam constituency ) Gw aram Local Gov ernment 8,754,328.48 8,236,787.42
517,541.06 Min of Env ironment
300
Proposed establishement of 10KM Shelterbelt at Babura, Maigatari, Kaugama and Birniw a Local Gov ernment
areas
10,422,000.00 9,436,500.00
985,500.00 Min of Env ironment
301
Proposed construction of Drainage (670M) at Makara dudu in Hadejia Local Gov ernment (2017 Constituency
project).
16,046,121.26 17,083,086.46
(1,036,965.20) Min of Env ironment
302 Proposed reclamation w ork at Iggi Tow n,Birnin Kudu Local Gov ernment Area 7,308,000.00 5,052,600.00 2,255,400.00 Min of Env ironment
303 Proposed construction of Drainage at Dandidi and Medi tow n in Gagaraw a Local Gov ernmet 74,466,201.00 65,658,630.09 8,807,570.91 Min of Env ironment
304 Proposed constr of 2n. Drainages at B/kudu 142,489,983.31 130,779,385.50 11,710,597.81 Min of Env ironment
BAL. C/F 18,134,397,745.87 17,671,863,221.97 462,534,523.90
S/N PROJECT IN PROCESS QUOTED SUM DPPM RECOMMENDED SAVING/ REMARKS
(N) COST (N) INCREASE
BAL. B/F 18,134,397,745.87 17,671,863,221.97 462,534,523.90
MINISTRY OF LAND -
305 Proposed Renov ation of Hon. Commissioners Official Recsidences (4NO.) at Commissioners Quarters, Dutse 15,582,854.78 14,862,773.30 720,081.48 Min of Land
306
Proposedconstruction of Boy s Quarters, w all fence Culv erts and Drainages at SSG and Head of Serv ice's Official
residences
42,997,026.48 44,429,367.30
(1,432,340.82) Urban Dev Board
307 Proposed Dev elopment contol activ ities (B) 65,240,000.00 55,740,000.00 9,500,000.00 Urban Dev Board
308 Proposed refurbushing of Plants and v ehicles (11no.) 8,996,505.00 8,961,017.05 35,487.95 Urban Dev Board
309 Proposed Dev elopment contol activ ities (A) 3,760,000.00 3,585,000.00 175,000.00 Urban Dev Board
CABINET OFFICE -
310 Proposed Construction of Juma'at mosques constituency projects across the state. 76,804,407.90 74,850,971.95 1,953,435.95 Cabinet Office
311 Proposed Furnishing and Equipping of Duputy Gov ernors Lodge Abuja 38,785,950.00 31,042,200.00 7,743,750.00 Cabinet Office
312 Completion of Friday Mosque Constituency projects across the state 39,806,237.15 43,087,517.98 (3,281,280.83) Cabinet Office
313 Proposed Construction of Grav e y ard and Juma'at mosque across the state 66,958,742.13 63,075,182.24 3,883,559.89 Cabinet Office
314 Proposed Repairs of (13NO) Prisons Operational Vehicles 7,847,000.00 8,004,000.00 (157,000.00) Cabinet Office
315 Proposed Maintenance/Upgrading 27NO. Local Gov tCouncils Radio Stations (Wireless/Ov er) 6,465,000.00 6,314,000.00 151,000.00 Cabinet Office
316
Proposed Furnishing, Wall Fence and Landscaping of Deputy Gov ernors Guest House at Kasarau Quarters,
Dutse 19,967,452.00 17,434,619.63 2,532,832.37 Cabinet Office
317 Proposed Recreational Park Dutse 66,946,320.00 66,058,583.78 887,736.22 Cabinet Office
318 Proposed completion of Daily and Juma'at Mosques Constituency Projects across the state. 80,707,271.20 74,590,266.43 6,117,004.77 Cabinet Office
319 Proposed construction of Mosquees (Second and Third Quarter 2017 constituency project) Gw iw a + taura 25,627,358.82 23,498,764.61 2,128,594.21 Cabinet office
320
Construction of3No. Juma'at Mosques at Stabare, Dandi and Tofa Gidan Sani in Ringim constituency by Messrs:
Engineering & multy Serv ices Limited (Additional w ork)
1,089,126.00 1,086,246.00
2,880.00 Cabinet office
321 Constr/completion of Juma'at mosque (4no.) at Birniw a, Buji, Yankw ashi and Kany a 67,316,462.37 65,208,796.32 2,107,666.05 Cabinet office
322 Construction of (24no) mosque Second and Third Quarter 2017 constituency project) 322,242,457.09 319,574,391.91 2,668,065.18 Cabinet office
323 Proposed construction of Gov ernor's Lodge Kaduna 173,166,103.54 149,329,225.82 23,836,877.72 Cabinet office
324 Rehabilitation of Islamiy y a School at Nassaraw a, Birnin kudu Local Gov ernment Area. 947,100.00 1,087,975.00 (140,875.00) Cabinet office
325 Completion of 3NO Mosque in the State (Takur Dutse, Kakudi in S/tankarkar & Kw atalo in K/Hausa) 26,803,046.80 26,803,722.80 (676.00) Cabinet office
326 Proposed supply of Furniture for the new ly acquired apartment in Asokoro 1,387,000.00 1,380,528.00 6,472.00 SSG Office
327 Proposed bituminous felt roofing and other renov ations at Dutse central Mosque 11,954,414.33 21,347,021.47 (9,392,607.14) SSG Office
328 Renov /Completion of Jumaat mosque at Danzaina in Taura LG. 8,152,066.99 8,152,066.99 - Cabinet office
329 Renov /Completion of (4no.) Jumaat mosques at K/kasamma tow n, Sunkuy e, Suga and GalambiCentral Mosque 37,478,314.79 38,076,833.88 (598,519.09) Cabinet office
330 Renov /completion of mosque at Maigatari, Ringim, Yankw ashi and Kaugama Constituencies 39,693,307.83 38,409,071.54 1,284,236.29 Cabinet office
MINISTRY OF AGRICULTURE -
331 Proposed Procurement of Veterinary Drugs for the Control of Disease in Goat 2,250,000.00 2,150,000.00 100,000.00 Min of Agriculture
332 Proposed Areal Spray for the Quelea Birds 6,300,000.00 6,300,000.00 - Min of Agriculture
333 Proposed Procurement of Field, Laboratories and Library Equipments 2,180,000.00 2,125,000.00 55,000.00 Mineral Resources
334 Proposed procurement of Animal v accines, v accination inputs and accessories. 7,609,500.00 6,234,500.00 1,375,000.00 Min of Agriculture
BAL. C/F 19,409,458,771.07 18,894,662,865.97 514,795,905.10
S/N PROJECT IN PROCESS QUOTED SUM DPPM RECOMMENDED SAVING/ REMARKS
(N) COST (N) INCREASE
BAL. B/F 19,409,458,771.07 18,894,662,865.97 514,795,905.10
335 Proposed construction of Solar porw ered borehole base (semiconduit) Irrigation sy stem for 25 HA module 52,884,295.54 50,621,838.75 2,262,456.79 Min of Agriculture
336 Proposed procurement of IT/surv ey equipments 1,840,000.00 1,446,000.00 394,000.00 Min of Agriculture
337 Stoking of Water bodies (Reserv oirs/Dams) across the State w ith Fish fingerlings 9,030,000.00 9,030,000.00 - Min of Agriculture
338 Proposed procurement of IT/surv eillance equipment and registration of poultry Farms 1,876,500.00 1,414,500.00 462,000.00 Min of Agriculture
339 Proposed Constr of Solar Pow ered Borehole base Irrigation scheme (DRIP) Irrigation sy stem for 25 HA Module 94,465,550.00 84,739,803.75 9,725,746.25 Min of Agriculture
340
Proposed constr of Solar Pow ered Borehole base (semi conduit) Irrigation scheme (DRIP) Irrigation sy stem for 25
HA Module
52,884,295.54 50,621,838.75
2,262,456.79 Min of Agriculture
DIRECTORATE OF ECONOMIC EMPOWERMENT -
341
Procurement of thirty (30) v ehicles to be distributed on loneto national union of road transport w orkers (NURTW)
Jigaw a State chapter (riv ised cost)
82,500,000.00 82,500,000.00
- Dir of Economic Emp.
342 Proposed purchased of (3NO) HP Computers (Laptop) 487,000.00 487,000.00 - Dir of Economic Emp.
343
Proposed procurement of 27NO. Qlink Motorcy cles to be distributed on loan to Local Gov ernment y outh
empoerment co-odinator
7,212,500.00 7,120,000.00
92,500.00 Dir of Economic Emp.
344 Proposed Procurement of Machines & Farm Implements for Distribution to Farmers on Loan 95,610,200.00 94,610,200.00 1,000,000.00 Dir of Economic Emp.
345
Proposed Procurement of Six ty (60NO) Motorcy cles and Drugs to be Distributed on Loan for Mobile Veterinary
Serv ice
17,223,700.00 15,125,700.00
2,098,000.00 Dir of Economic Emp.
346
Proposed Procurement of Thirty (30NO) Vehicles to be Distributed on Loan to Nigerian Association of Road
Transport Ow ners (NARTO) Jigaw a State Branch (Tukumbo Buses)
94,050,000.00 94,050,000.00
- Dir of Economic Emp.
347 Proposed Fabrication of (50 Units) Rice Threshers by local mechanics 8,141,000.00 7,901,000.00 240,000.00 Dir of Economic Emp.
348
Proposed procurement of Paddy threshers and Rice milling Machine to be giv en on loan to Youth 28,430,000.00 28,430,000.00
- Dir of Economic Emp.
349
Proposed procurement of multi-function Rice milling Machine to be distributed on loan to Farmers 8,000,000.00 8,000,000.00
- Dir of Economic Emp.
350
Proposed procurement of Six ty (60NO.) Motorcy cles and drugs to be distributed on loan to Mobile v eterinary
serv ice
24,522,000.00 22,422,000.00
2,100,000.00 Dir of Economic Emp.
351 Proposed construction of cottage Rice processing Mill in (6NO.) locations across the State (each) 14,364,783.15 14,103,352.11 261,431.04 Dir of Economic Emp.
MINISTRY OF JUSTICE -
352 Proposed installation of CCTV at Courtof Justice and hon chief judges residence Dutse 9,946,882.00 8,473,500.00 1,473,382.00 High Court of Justice
353 Proposed fueling and maintenance of high court Generator set (650KVA). 22,928,325.00 20,877,675.00 2,050,650.00 High Court of Justice
354 Proposed of 1NO. Toy ota Prado Jeep (2016 model) and 4NO. Toy ota camry (2015 model) 94,906,064.50 94,906,064.50 - High Court of Justice
355 Proposed Establishment of E-Library , Procurement of Law Reports Tools and Applications 9,975,000.00 9,730,000.00 245,000.00 Min of Justice
356 Purchase of Office Furniture and Equipments 3,984,200.00 3,999,200.00 (15,000.00) Judicial Serv ices
357 Purchase Pool Utility Vehicle (KIA Optima 2.0L EX) (1no) 12,000,000.00 12,000,000.00 - Judicial Serv ices
358 Purchase of Office Furniture and Equipments 4,134,200.00 4,017,200.00 117,000.00 Judicial Serv ices
359 Procurement and Installation of 100KVA Generator at the Chief Judge Residence, Dutse (1no.) 7,000,000.00 7,000,000.00 - Higher Court
BAL. C/F 20,167,855,266.80 19,628,289,738.83 539,565,527.97
S/N PROJECT IN PROCESS QUOTED SUM DPPM RECOMMENDED SAVING/ REMARKS
(N) COST (N) INCREASE
BAL. B/F 20,167,855,266.80 19,628,289,738.83 539,565,527.97
360
Proposed construction of Boy s Quarters, w all fence, gate House, borehole, procurement of Furnitures and
renov ation of the proposed Guest House for the High court 25,932,052.61 25,759,827.35 172,225.26 High Court of Justice
361 Proposed purchase of 1No. House at Fatara Housing Estate 15,918,585.20 15,918,585.20 - High Court of Justice
362
Procurement and installation of (1No.) 50KVA Perkin's Sound proof Generator (UK assembled) at the Official
residence of Hon. Grand Kadi 5,300,000.00 5,300,000.00 - Sharia Court of Appeal
363 Completion of Juv enile prison, Gate lodge, Mosque, Class room and perimeter w all at Babura (rev ised scope) 63,557,957.76 58,485,504.30 5,072,453.46 Min of Justics
364 Proposed construction of chamo and y alo shariah courts 43,195,185.37 42,561,989.42 633,195.95 Sharia Court
365 Proposed Repair of (3N0) Utility v ehicles. 493,000.00 493,000.00 - Min of Justice
366 Proposed renov ation of Gw aram, Malam madori upper shari'ah court and madana shari'ah court. 14,002,627.31 13,016,228.30 986,399.01 Sharia Court
MINISTRY OF COMMERCE -
367 Proposed Purchase of Tourism Promotional Equipment and Printing of Tourist Guide Handbook 1,790,000.00 1,790,000.00 - Min of Commerce
368 Proposed Renov ation/Rehabilitation of 3-Star Hotel, Dutse 528,553,245.49 431,823,431.40 96,729,814.09 Min of Commerce
369 Proposed Supply of Hotel Furniture and Electronis at 3-Star Hotel, Dutse 178,855,665.00 152,326,700.00 26,528,965.00 Min of Commerce
370 Proposed renov ation of Maigatari ex port processing Zone (EPZ) (Rev ised cost) 151,764,940.69 166,924,996.90 (15,160,056.21) Min of Commerce
371
Proposed procurement of Office Furniture at House near Gov ernment House for Local Technical unit of Zinder-
Daura-Jigaw a-Kano trade corridor 2,960,500.00 3,554,000.00 (593,500.00) Min of Commerce
372 Proposed conduct of Baseline surv ey of artisanal miners/activ ities in 14LGA's in the State 2,874,600.00 1,664,300.00 1,210,300.00 Mineral Resources
MANPOWER DEVELOPMENT INSTITUTE (MDI) -
373
Proposed Supply of Furniture and Electronics to New ly Built Guest Facilities (Chalets and Main Bulding) at
Manpow er Dev elopment Institute Dutse 199,027,500.00 244,300,140.00 (45,272,640.00) MDI
374 Proposed construction of Laundry , store and ex ternal w ork for Electrical pow er supply 104,828,412.94 100,570,724.52 4,257,688.42 MDI
375
Supply and installation of funiture and Electronics for the new Guest's facilities at Manpow er dev elopment Institute
(additional w ork) 3,000,000.00 3,000,000.00 - MDI
376
Supply and installation of funiture and Electronics for the new Guest's facilities at Manpoer dev elopment Institute
(change of scope) 7,800,000.00 7,700,000.00 100,000.00 MDI
JIGAWA STATE HOUSE OF ASSEMBLY -
377 Request for benchmark price 206,453,099.00 206,453,099.00 - House of Assembly
378 Proposed Prov ision of Street Light at the Legislativ e Quarters Dutse 4,620,347.08 3,855,333.35 765,013.73 House of Assembly
379 Proposed procurement of 1NO. Ford ex plorer XTL leather. 33,993,750.00 33,993,750.00 - House of Assembly
380 Proposed Constr, Renov ation & Supplies at Legislativ e offices and Residence, Dutse. 70,308,670.02 68,438,821.79 1,869,848.23 House of Assembly
381 Proposed procurement of v ehicle, laptop, printer.and scanner. 28,228,691.40 28,228,691.40 - House of Assembly
382 Procurement of v ehicles. 8,844,150.00 8,844,150.00 - House of Assembly
BAL. C/F 21,870,158,246.67 21,253,293,011.76 616,865,234.91
S/N PROJECT IN PROCESS QUOTED SUM DPPM RECOMMENDED SAVING/ REMARKS
(N) COST (N) INCREASE
BAL. B/F 21,870,158,246.67 21,253,293,011.76 616,865,234.91
MINISTRY OF FINANCE AND ECONOMIC PLANNING -
383 Propsoed supply of office furniture and equipment. 8,339,750.00 10,238,812.00 (1,899,062.00) Min of finance
384 Proposed procurement of someOffice equipments 4,765,278.00 4,186,960.00 578,318.00 Min of finance
MINISTRY OF JUSTICE -
385 Proposed installation of CCTV at Courtof Justice and hon chief judges residence Dutse 9,946,882.00 8,473,500.00 1,473,382.00 High Court of Justice
386 Proposed fueling and maintenance of high court Generator set (650KVA). 22,928,325.00 20,877,675.00 2,050,650.00 High Court of Justice
387 Proposed of 1NO. Toy ota Prado Jeep (2016 model) and 4NO. Toy ota camry (2015 model) 94,906,064.50 94,906,064.50 - High Court of Justice
388 Proposed Establishment of E-Library , Procurement of Law Reports Tools and Applications 9,975,000.00 9,730,000.00 245,000.00 Min of Justice
389 Purchase of Office Furniture and Equipments 3,984,200.00 3,999,200.00 (15,000.00) Judicial Serv ices
390 Purchase Pool Utility Vehicle (KIA Optima 2.0L EX) (1no) 12,000,000.00 12,000,000.00 - Judicial Serv ices
391 Purchase of Office Furniture and Equipments 4,134,200.00 4,017,200.00 117,000.00 Judicial Serv ices
392 Procurement and Installation of 100KVA Generator at the Chief Judge Residence, Dutse (1no.) 7,000,000.00 7,000,000.00 - JS Higher Court
393 Proposed construction of chamo and y alo shariah courts 43,195,185.37 42,561,989.42 633,195.95 Sharia Court
394 Proposed Repair of (3N0) Utility v ehicles. 493,000.00 493,000.00 - Min of Justice
395 Proposed renov ation of Gw aram, Malam madori upper shari'ah court and madana shari'ah court. 14,002,627.31 13,016,228.30 986,399.01 Sharia Court
MINISTRY OF INFORMATION -
396 Proposed supply and installation of diesel Generating set (150KVA sound proof 7,500,000.00 7,500,000.00 - Min of information
397 Upgrading of Dutse Stadium (Changeof Scope) 524,794,441.42 524,794,441.42 - Min of Information
398
Proposed Construction of Production Hall, Renov ation of Ex isting Structure and Supply of Printing Equipment at
Jigaw a State Printing Press 353,257,958.50 342,380,253.30 10,877,705.20 Min of Information
399 Proposed Purchase of Motorcy cles (Box er/Bajaj) (6no.) 1,680,000.00 1,470,000.00 210,000.00 Min of Information
400 Proposed procurement of 1NO. Toy ota Hilux engine and 6NO. Motorcy le. 3,445,000.00 3,165,000.00 280,000.00 Min of information
401 Proposed procurement of AM &FM Radio station spare parts. 22,246,961.82 20,380,500.00 1,866,461.82 Min of information
402 Proposed constr of corpers lodge 6no. Bungalow of 3-bedroom each 10,590,042.00 12,949,288.01 (2,359,246.01) Min of information
MINISTRY OF WOMEN AFFAIRS -
403 Proposed procurement of Equipment 1,865,000.00 2,741,000.00 (876,000.00) Min of Woman Aff
404 Proposed Renov ation Worksat Women Dev elopment CentreDutse 9,367,862.72 11,428,016.84 (2,060,154.12) Min of Women Affairs
405 Proposed Fabrication of (7500 Units) Improv ed Wood Economy Stov es 10,185,000.00 10,185,000.00 - Alternativ e Energy
406 Proposed Purchase of Solar Spare Parts for the Maintenance of the Ex iisting Solar Villages Across the State 9,815,000.00 9,165,000.00 650,000.00 Alternativ e Energy
407 Proposed Supply of 1000 Metric Tons of Maize to Jigaw a State 196,875,000.00 196,875,000.00 - Rehabilitation Board
BAL. C/F 23,257,451,025.31 22,627,827,140.55 629,623,884.76
S/N PROJECT IN PROCESS QUOTED SUM DPPM RECOMMENDED SAVING/ REMARKS
(N) COST (N) INCREASE
BAL. B/F 23,257,451,025.31 22,627,827,140.55 629,623,884.76
GOVERNMENT HOUSE -
408 Proposed price of v ehicles 15,300,000.00 19,753,125.00 (4,453,125.00) Gov t House
409 Procurment of (1no.) Toy ota Prado (2015 model) 24,912,990.00 24,912,990.00 - Gov t House
410 Procurement of (1NO) Toy ota Lex us jeep (2010 Model) (Armoured) 35,000,000.00 35,000,000.00 - Gov t House
OFFICE OF THE AUDITOR GENERAL -
411
Proposed Renov ation of AuditArea Offices, Refurbishing of Official Vehicles Procurement of Motor Cy cles 25,046,301.40 23,063,306.05
1,982,995.35 Auditor General
-
MINISTRY FOR LOCAL GOVT -
412 Proposed construction of Office at Birnin kudu and Ringim Local Gov t Area (2018) 31,806,614.36 34,465,480.24 (2,658,865.88) Local Gov t Audit
TOTAL 23,389,516,931.07 22,765,022,041.84 624,494,889.23
SECTION ( D )
CONTRACTS AWARDED
JANUARY TO DECEMBER, 2017
S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD
(N)
WORKS1 24/01/2017 Constr. of Juma'at Prayer Mosque at Galambi, fagam Constituency in Gwaram LGA. FGPC/1/2017/VOL.1/5 Ramadan Constr. Nig. Ltd. 26,396,975.14 Cabinet Office 16 weeks
2 24/01/2017 Constr. of Juma'at Prayer Mosque at Tauran Gabas and Yalwa in Kaugama Constituency. FGPC/2/2017/VOL.1/5 Lungun Fulani Nigeria Ltd. 4,461,077.19 Cabinet Office 8 weeks
3 24/01/2017 Constr. of Juma'at Prayer Mosque at Amanga in Sule-Tankarkar Constituency. FGPC/10/2017/VOL.1/5 Umar Co. Roofing Products 9,164,435.46 Cabinet Office 8 weeks
4 24/01/2017 Constr. of Juma'at Prayer Mosque at Umadu in Miga Constituency. FGPC/4/2017/VOL.1/5 AMIA Integrated Services Ltd. 5,073,163.14 Cabinet Office 6 weeks
5 24/01/2017 Constr. of Juma'at Prayer Mosque at Medu in Gagarawa Constituency. FGPC/8/2017/VOL.1/5 Umar Co. Roofing Products 25,853,039.07 Cabinet Office 16 weeks
6 24/01/2017 Constr. of Juma'at Prayer Mosque at Kukuma yamma and Gubabiya in Buji Constituency. FGPC/7/2017/VOL.1/5 Loyalty Properties Nig. Ldt. 5,613,871.72 Cabinet Office 6 weeks
7 24/01/2017 Constr. of Juma'at Prayer Mosque at Fagwalayi in Jahun Constituency. FGPC/6/2017/VOL.1/5 Na-bakwai Gen. Enterprises 5,534,474.56 Cabinet Office 6 weeks
8 24/01/2017 Constr. of Juma'at Prayer Mosque at Gorumo and Jibanin in Kiyawa Constituency. FGPC/9/2017/VOL.1/5 Damastbo Ventures Ltd. 10,146,326.28 Cabinet Office 6 weeks
9 24/01/2017 Constr. of Juma'at Prayer Mosque at Kwajali in Taura Constituency. FGPC/3/2017/VOL.1/5 Nushe Business Resources 7,059,894.75 Cabinet Office 6 weeks
10 1/2/2017
Constr. of Hand pumps Water Supply Schemes as Constitutuency Projects at Sabuwar unguwa,
Kurket G/Dabo, Roran Fulani, Daba Yamma and Kawti in Gwiwa Constitutuency FGPC/13/2017/VOL.1/6 Isah Halilu Nig. Ltd. 2,762,025.00 Min. of Water Resources 8 weeks
11 1/2/2017 Constr. of Solar Powered water supply scheme at Santar Hayo in Gwiwa Constituency. FGPC/12/2017/VOL.1/6 Isah Halilu Nig. Ltd. 6,176,625.00 Min. of Water Resources 8 weeks
12 14/2/2017 Improvement of Kazaure Town Water Supply (Additional works) FGPC/25/2016/VOL.1/21 Marb Eng. & Multy Serv. 32,731,295.63 Min. of Water Resources 8 weeks
13 14/3/2017
Constr. of Hand Pumps Water Supply Schemes as Constituency Projects at Sabon Garin Yaya
yamma, Fitatin (Kwalau ward), Gidan Nagi, Gama Kauye and Chukwaikwaiwa in Taura
Constituency. FGPC/92/2016/VOL.1/10 Nushe Business Resources 2,780,800.00 Min. of Water Resources 8 weeks
14 9/3/2017
Constr. of Hand Pumps Water Supply Schemes as Constituency Projects at Turinjiran yamma,
Fadawa Karama, Malumawar Kiri, Shagen Gabas and Majiya in Bulangu Constituency. FGPC/94/2016/VOL.1/10 Bulangu Drill ing Srvices 2,759,500.00 Min. of Water Resources 8 weeks
15 6/3/2017
Constr. of Hand Pumps Water Supply Schemes as Constituency Projects at Dan Gwabro, Gwabso,
Walawa, Malam Lawan Mai Nono and Lallashi Village in Maigatari Constituency. FGPC/14/2017/VOL.1/10 Nadada Ventures Nig. Ltd. 2,755,800.00 Min. of Water Resources 8 weeks
16 6/3/2017
Constr. of Hand Pumps Water Supply Schemes as Constituency Projects at Arewawa, Jaruwa,
Tunfusa Arewa, Riga and GDSS Jahun in Jahun Constituency. FGPC/82/2016/VOL.1/20 Muhal Global Concept 2,748,375.00 Min. of Water Resources 8 weeks
17 7/3/2017
Constr. of Hand Pumps Water Supply Schemes as Constituency Projects at Banbare Gidan Sallau,
Ka'el vil lage, Gumumuwa, Gizo Babba and Kabobi vil lage in Kazaure Constituency. FGPC/73/2016/VOL.1/11 Marb Eng. & Multy Serv. 2,769,900.00 Min. of Water Resources 8 weeks
18 7/3/2017
Constr. of Hand Pumps Water Supply Schemes as Constituency Projects at Digawar Hausawa
Fulani, U/Dawa, Kaka'aiki Zara, Zangon Sallau Gabas and Majiyawar Kanawa in Ringim
Constituency. FGPC/75/2016/VOL.1/20 Marb Eng. & Multy Serv. 2,769,285.00 Min. of Water Resources 8 weeks
19 20/3/2017
Constr. of Second phase Islamiyya Classroom blocks at Fanisau (Karnaya ward) and Gofai
(Limawa ward) in Dutse Constituency FGPC/21/2017/VOL.1/8 Al-kasam Jannah 5,551,958.00 SUBEB 6 weeks
BALANCE C/D 163,108,820.94
S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD
(N)
BALANCE B/F 163,108,820.94
20 20/3/2017
Constr. of Second phase Islamiyya Classroom blocks at Kukuma Kofar Yamma and Gubabbiya
(Madabe ward) in Buji Constituency FGPC/25/2017/VOL.1/8 Loyalty Properties Ltd. 5,449,021.80 SUBEB 6 weeks
21 20/3/2017
Constr. of Second phase Islamiyya Classroom blocks at Gidan Kanawa (Kanya ward) in Kanya
Babba Constituency in Babura LGA. FGPC/26/2017/VOL.1/8 Detech Nigeria Ltd. 2,649,826.41 SUBEB 6 weeks
22 20/3/2017
Constr. of Second phase Islamiyya Classroom blocks at Agamo (Gamawa Juwai ward) in Auyo
Constituency FGPC/28/2017/VOL.1/8 A.A. Al-jazeera Agro 2,898,894.24 SUBEB 6 weeks
23 20/3/2017
Constr. of Second phase Islamiyya Classroom blocks at Janbulo (Arewa ward) in Kazaure
Constituency FGPC/20/2017/VOL.1/8 Dutse Taura Constr. Co. 2,708,227.41 SUBEB 6 weeks
24 1/3/2017
Constr. Of 2-SPAN Bridge as Change of Scope from 2No. 3-Cells box culverts on Gwaram-Basirka
road. FGPC/17/2017/VOL.1/8 Alren Constr. Co. Ltd. 292,696,945.76 Min. of Works
25 20/3/2017
Constr. of Second phase Islamiyya Classroom block at Madaci town in Kirikasamma
Constituency. FGPC/23/2017/VOL.1/8 Alh. Umar Baban Doki Ltd. 2,801,000.00 SUBEB 6 weeks
26 29/3/2017
Constr. of Hand Pumps Water Supply Schemes (phase II) as Constituency projects at Baushina,
Danya, Garin Daudu and Unguwar Wala Shede in Kafin Hausa Constituency. FGPC/40/2017/VOL.1/16 A &T Global Resources 2,209,620.00 Min. of Water Resources 8 weeks
27 29/3/2017
Constr. of Solar Water Supply Schemes (phase II) as Constituency projects at Ruba (kafin Hausa
ward) in Kafin Hausa Constituency. FGPC/25/2017/VOL.1/16 A &T Global Resources 6,250,650.00 Min. of Water Resources 8 weeks
28 29/3/2017
Constr. of Hand Pumps Water Supply Schemes (phase II) as Constituency projects at Majiyawa
Kunama, Layoyal, Margawa, Barebari, Jankawa, Farau and Daguzau in Ringim Constituency. FGPC/20/2017/VOL.1/16 Marb Eng. & Multi Serv. 3,866,835.00 Min. of Water Resources 8 weeks
29 29/3/2017
Constr. of Hand Pumps Water Supply Schemes (phase II) as Constituency projects at Katoge, Kofar
Alh. Zabgi, Tsamiyar Ilu and Fed. Govt. Girls College (FGC) Kazaure in Kazaure Constituency. FGPC/18/2017/VOL.1/16 Marb Eng. & Multi Serv. 2,209,620.00 Min. of Water Resources 8 weeks
30 29/3/2017
Constr. of Hand Pumps Water Supply Schemes (phase II) as Constituency projects at Bosuwa
Tsangaya, Lallashi Makera, Hardo Jauro, Rugar Musa Ja'o, Fulanin Kankare, Hardo Gambo and
Kaya Jamu in Maigatari Constituency. FGPC/24/2017/VOL.1/16 Muhal Global Concept 3,866,835.00 Min. of Water Resources 8 weeks
31 29/3/2017
Constr. of Solar Powered Water Supply Scheme (phase II) as Constituency projects at Kafi (Kanya
ward) kanya Constituency in Babura LGA. FGPC/28/2017/VOL.1/16 Deetech Nig. Ltd. 6,075,825.00 Min. of Water Resources 8 weeks
32 29/3/2017
Constr. of Solar Powered Water Supply Scheme (phase II) as Constituency projects at Malam
Madori (M/Madori ward) in Malam Madori Constituency. FGPC/21/2017/VOL.1/16 Ramadan Constr. Ltd. 6,250,650.00 Min. of Water Resources 8 weeks
33 29/3/2017
Constr. of Solar Powered Water Supply Scheme (phase II) as Constituency projects at Madachi
(Kiri kasamma ward) in Kirikasamma Constituency. FGPC/26/2017/VOL.1/16 Alh. Umar Baban Doki Ltd. 6,270,000.00 Min. of Water Resources 8 weeks
34 29/3/2017
Constr. of Solar Powered Water Supply Scheme (phase II) as Constituency projects at Sabuwar
Daba (Margadu ward) in Guri Constituency. FGPC/23/2017/VOL.1/16 A.Y.H. Invest. Co. Ltd. 6,144,600.00 Min. of Water Resources 8 weeks
35 29/3/2017
Constr. of Solar Powered Water Supply Scheme (phase II) as Constituency projects at Kore
Sabuwa (Garin Chiroma ward) in Gagarawa Constituency. FGPC/19/2017/VOL.1/16 Loyalty PropertiesLtd. 6,268,290.00 Min. of Water Resources 8 weeks
BALANCE C/D 521,725,661.56
S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD(N)
BALANCE B/F 521,725,661.56
36 29/3/2017
Constr. of Solar Powered Water Supply Scheme (phase II) as Constituency projects at Wurmawa
(Jahun ward) in Jahun Constituency. FGPC/22/2017/VOL.1/16 Loyalty PropertiesLtd. 6,268,290.00 Min. of Water Resources 8 weeks
37 29/3/2017
Constr. Of Water Collection Points (phase II) as Constituency projects at Gawuna, Makara Huta,
Fantai, Bayan Vocational, Bayan Bitenary, Gagulmari, Kasuwar Kudu, Bakin Kasuwa, Dubantu and
Yankoli in Hadejia Constituency. FGPC/45/2017/VOL.1/16 Zurfat Investment Ltd. 9,874,848.00 Min. of Water Resources 8 weeks
38 29/3/2017
Constr. of Hand Pumps Water Supply Schemes (phase II) as Constituency projects at Fulanin Kafa
Ruwa, Male Fulani, Unguwar Shura, Baggade, Kankare, S/Unguwar Hanyar Gumel, Gangara
Bugaje, Unguwar Tsamiya, Madalla, Takwasa, Jabirawa Fulani, Yantuba and Gangara in Babura
Constituency. FGPC/29/2017/VOL.1/16 Mufabamex Concept Ltd. 7,181,265.00 Min. of Water Resources 8 weeks
39 29/3/2017
Constr. of Hand Pumps Water Supply Schemes (phase II) as Constituency projects at Yosaro,
Dilima/Zaramba and Mungulo in B/Kudu Constituency. FGPC/31/2017/VOL.1/16 A.A. Aljazeera Agro Properties 1,657,215.00 Min. of Water Resources 8 weeks
40 29/3/2017
Constr. of Hand Pumps Water Supply Schemes (phase II) as Constituency projects at Gwaram,
Jikas and Dazara in Gwaram Constituency. FGPC/35/2017/VOL.1/16 A.A. Aljazeera Agro Properties 1,657,215.00 Min. of Water Resources 8 weeks
41 29/3/2017
Constr. of Hand Pumps Water Supply Schemes (phase II) as Constituency projects at Mazawa
Kwanar Karo in Miga Constituency. FGPC/37/2017/VOL.1/16 Loyalty Properties Ltd. 552,405.00 Min. of Water Resources 8 weeks
42 29/3/2017
Constr. of Hand Pumps Water Supply Schemes (phase II) as Constituency projects at Gidan Riga,
Dangolin Kurori, Malamawa Narba, Kofar Malam Fulani and Batsayi in Jahun Constituency. FGPC/34/2017/VOL.1/16 Loyalty Properties Ltd. 2,762,025.00 Min. of Water Resources 8 weeks
43 29/3/2017
Constr. of Hand Pumps Water Supply Schemes (phase II) as Constituency projects at Garin Dutse
in Gagarawa Constituency. FGPC/32/2017/VOL.1/16 Loyalty Properties Ltd. 552,405.00 Min. of Water Resources 8 weeks
44 29/3/2017
Constr. of Hand Pumps Water Supply Schemes (phase II) as Constituency projects at Rigar Hardo
Shuaibu, Rugar Yola, Rugar Gambo Baki, Nasarawa Qtrs. Rugar Gaiye Kujuru, Majanguwa and
Zoriyo in Guri Constituency. FGPC/33/2017/VOL.1/16 A.Y.H. Investment Co. 3,866,835.00 Min. of Water Resources 8 weeks
45 29/3/2017
Constr. of Hand pumps Water Supply Schemes (phase II) as Constituency projects at Takaji, Yayari
Yamma, Tubali and Gorawa in Bulangu Constituency, K/Hausa LGA. FGPC/38/2017/VOL.1/17 Bulangu Drill ing Serv. 2,209,620.00 Min. of Water Resources 8 weeks
46 20/3/2017
Constr. of Second phase Islamiyya Classroom block at Jahun town behind police stationin Jahun
Constituency. FGPC/46/2017/VOL.1/8 Loyalty Properties Ltd. 2,800,000.00 SUBEB 6 weeks
47 29/3/2017
Constr. of Hand pumps Water Supply Schemes (phase II) as Constituency projects at Ung. Gabas,
Rugar Maina Duka, Rugar Adamu Chilaro, Rugar Lamido Gardi and Rugar Hardo Ghamma in
Birniwa Constituency. FGPC/30/2017/VOL.1/16 Hambiscon Nig. Ltd. 2,762,025.00 Min. of Water Resources 8 weeks
48 29/03/2017
Constsruction of Hand pumps Water supply schemes (phase II) as constituency project
at Yola, Masanawa, Larabar Gulai, Katanga Kudu, Dan koli and Dubal in Kiyawa
Constituency. FGPC/39/2017/VOL.I/16 DE-MASTBO 3,331,430.00 Min of Water Resources 8 weeks
49 13/04/2017
Constsruction of Hand pumps Water supply schemes (phase II) as constituency project
at Baushe, Katanga, Tambai and Kadirawan G. Sarki in Kafin Hausa constituency FGPC/40/2017/VOL.I/19 A &T GOLOBAL 2,209,620.00 Min of Water Resources 8 weeks
50 5/4/2017
Constsruction of Hand pumps Water supply schemes (phase II) as constituency project
at Kwandiga, Garin Kanya, Kanya, Maina Binda, Arbu Kofar Liman, Yalleman Hausawa,
Bultuwa and Kuka Kwance in Kaugama constituency FGPC/41/2017/VOL.I/18 A &T GOLOBAL 4,419,240.00 Min of Water Resources 8 weeks
51 29/03/2017
Construction of Solar Powered Water supply schemes (Phase II) as constituency
Projects at Sabuwar Rafa (Andaza ward ) in Dutse constituency FGPC/27/2017/VOL.I/16 DE-MASTBO 6,270,000.00 Min of Water Resources 8 weeks
BALANCE C/D 580,100,099.56
S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIESCOMP. PERIOD
(N)
BALANCE B/F 580,100,099.56
52 29/03/2017
Construction of Solar Powered Water supply schemes (Phase II) as constituency
Projects at Kantudu (Zango Ward ) in Gumel constituency FGPC/42/2017/VOL.I/16 JAG&H INT SVC 6,250,650.00 Min of Water Resources 8 weeks
53 4/5/2017
Construction of Water collection point Huta, Fantai Bayan Bitenary, Yan koli, IlLALLA,
Chadi, Garko baya GSS Wunti, Bello Bayi and Bayan GSS Aminu Yusuf (Sabuwar Unguwa)
in Hadejia constituency FGPC/45/2017/VOL.I/19 ZURFAT INVT NIG LTD 9,874,848.00 Min of Water Resources 8 weeks
54 16/5/2017 Provision of additional water scheme at Mapower development Institute, Dutse FGPC/63/2017/VOL.I/5 BABAN DOKI GEN ENT 29,244,451.95 Min of Water Resources 12 weeks
55 6/6/2017 Cost Variation/Fluctuation on the improvement of Gumel Town Water supply FGPC/160/2016/VOL.I/9 MARB ENGR SVC LTD 33,651,870.00 Min of Water Resources
56 6/6/2-017 Cost Variation/Fluctuation on the improvement of BaburaTown Water supply FGPC/16/2016/VOL.I/9 PRESTIGE INT. SERVICES 23,180,335.00 Min of Water Resources
57 21/6/2017
Constr. Of 4no. Hand pumps Water supply schemes (phase II) as Constituency projects
at Kofar Gidan Liman, Bayan Gidan Sarkin Bai, Zankuwa fulani and Sabuwar SSS in Garki
Constituency. FGPC/99/2017/VOL.1/5 Taqib Ventures Nig. Ltd. 2,340,000.00 Min of Water Resources 8 weeks
58 21/6/2017
Constr. Of 4no. Hand pumps Water supply schemes (phase II) as Constituency projects
at Kofar Gidan Liman, Bayan Gidan Sarkin Bai, Zankuwa fulani and Sabuwar SSS in Garki
Constituency. FGPC/99/2017/VOL.1/5 Taqib Ventures Nig. Ltd. 2,340,000.00 Min of Water Resources 8 weeks
59 21/6/2017
Constr. Of Solar powered water supply scheme (phase II) as constituency projects at
Karkarna in Yankwashi Constituency. FGPC/97/2017/VOL.1/5 GRANATOIDS ENG SERV. 6,214,000.00 Min of Water Resources 8 weeks
60 21/6/2017
Constr. Of Solar powered water supply scheme (phase II) as constituency projects at
Tattari in Maigatari Constituency. FGPC/98/2017/VOL.1/5 Muhal Global Concept 6,074,000.00 Min of Water Resources 8 weeks
61 4/4/2017
Construction of second Phase Islamiyya Classroom block at Jabo Town in Balangu
constituency Kafin Hausa Local Government Area FGPC/51/2017/VOL.I/10 KAWU NIG LTD 2,805,718.53 SUBEB 6 weeks
62 4/4/2017
Construction of second Phase Islamiyya Classroom block at Dan Gyatin in Miga
constituency FGPC/57/2017/VOL.I/9 AMIA INT NIG LTD 2,746,789.80 SUBEB 6 weeks
63 4/4/2017
Construction of second Phase Islamiyya Classroom block at Madaci Town in
Kirikasamma constituency FGPC/52/2017/VOL.I/10 ALH UMARU BABAN DOKI 2,801,000.00 SUBEB 6 weeks
64 4/4/2017
Construction of second Phase Islamiyya Classroom block at Janbulo (Arewa ward) in
Kazaure constituency FGPC/49/2017/VOL.I/10 DUTSEN TAURA 2,708,227.41 SUBEB 6 weeks
65 20/3/2017
Construction of second Phase Islamiyya Classroom block at Addani (Gurjiya Ward) in
Yankwashi constituency FGPC/47/2017/VOL.I/8 GRANATOIDS ENGR 2,694,252.27 SUBEB 6 weeks
66 4/4/2017
Construction of second Phase Islamiyya Classroom block at Kadeta (medu) ward) in
Gagarawa constituency FGPC/56/2017/VOL.I/10 ESMAIL VEN LTD 2,728,050.34 SUBEB 6 weeks
67 22/05/2017
Construction of Kaugama-Turmi-Baban Tata-Dan zabiya-Gangara-Kuka kwance-Gujungu
Feeder Road (21KM) FGPC/64/2017/VOL.I/8 IGEE ENGR LTD 389,273,999.56 Min of Works 6 Month
BALANCE C/F 1,105,028,292.42
S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIESCOMP. PERIOD
(N)
BALANCE B/F 1,105,028,292.42
68 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency
project at Garin Chiroma in Gagarawa consitituency. FGPC/92/2017/VOL.1/10 HARUNA LADAN INVEST. 19,285,412.31 Min of Health 16 weeks
69 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency
project at Auyakayi in Auyo consitituency. FGPC/65/2017/VOL.1/10 BABAN DOKI GEN. ENTP. 19,576,947.50 Min of Health 16 weeks
70 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency
project at Gangara in Gumel consitituency. FGPC/71/2017/VOL.1/10 POLYSPEC NIG. LTD. 19,100,000.00 Min of Health 16 weeks
71 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency
project at Maraganta in Gwiwa consitituency. FGPC/72/2017/VOL.1/10 NGALOMA CONSTR. CO. 19,253,751.00 Min of Health 16 weeks
72 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency
project at Gurarraji in Garki consitituency. FGPC/91/2017/VOL.1/10 A.H.I.K. ENTP. LTD. 19,304,132.10 Min of Health 16 weeks
73 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency
project at Ba'auzini in Kazaure consitituency. FGPC/76/2017/VOL.1/10 BABAN DOKI GEN. ENTP. 19,276,132.05 Min of Health 16 weeks
74 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency
project at Fake in Kiyawa consitituency. FGPC/77/2017/VOL.1/10 BABAN DOKI GEN. ENTP. 19,576,947.50 Min of Health 16 weeks
75 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency
project at Dansure in Roni consitituency. FGPC/82/2017/VOL.1/10 DANGATA MEMORIAL 19,335,533.23 Min of Health 16 weeks
76 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency
project at Taka tsaba in Suletankarkar consitituency. FGPC/83/2017/VOL.1/10 POLYSPEC NIG. LTD. 19,675,403.00 Min of Health 16 weeks
77 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency
project at Dankari in Yankwashe consitituency. FGPC/87/2017/VOL.1/10 BABAN DOKI GEN. ENTP. 19,490,741.50 Min of Health 16 weeks
78 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency
project at Baderin gabas in Hadejia consitituency. FGPC/88/2017/VOL.1/10 NGALOMA CONSTR. CO. 19,035,479.45 Min of Health 16 weeks
79 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency
project at Giginya in Babura consitituency. FGPC/89/2017/VOL.1/10 POLYSPEC NIG. LTD. 19,312,904.52 Min of Health 16 weeks
80 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency
project at Sarkin baka in Kanya babba consitituency. FGPC/90/2017/VOL.1/10 BABAN DOKI GEN. ENTP. 19,225,138.00 Min of Health 16 weeks
81 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency
project at Sabon garin yaya in Taura consitituency. FGPC/85/2017/VOL.1/10 A.H.I.K. ENTP. LTD. 19,394,831.50 Min of Health 16 weeks
BALANCE C/F 1,375,871,646.08
S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIESCOMP. PERIOD
(N)
BALANCE B/F 1,375,871,646.08
82 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency
project at Surko in Birnin kudu consitituency. FGPC/66/2017/VOL.1/10 A.H.I.K. ENTP. LTD. 19,575,646.20 Min of Health 16 weeks
83 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency
project at Ruba in Kafin hausa consitituency. FGPC/79/2017/VOL.1/10 S.U.B. GEN VENTURES 19,523,847.00 Min of Health 16 weeks
84 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency
project at Jarmari in Kirikasamma consitituency. FGPC/78/2017/VOL.1/10 A.A MAIKATAKO 19,723,317.08 Min of Health 16 weeks
85 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency
project at Kantami in Kaugama consitituency. FGPC/75/2017/VOL.1/10 S.U.B. GEN VENTURES 19,523,847.08 Min of Health 16 weeks
86 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency
project at Dawa in Guri consitituency. FGPC/73/2017/VOL.1/10 S.U.B. GEN VENTURES 19,253,751.00 Min of Health 16 weeks
87 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency
project at Zandam ta Gabas in Gwaram consitituency. FGPC/70/2017/VOL.1/10 S.U.B. GEN VENTURES 19,522,270.50 Min of Health 16 weeks
88 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency
project at Dingiya in Fagam consitituency Gwaram Local Government Area FGPC/69/2017/VOL.1/10 A.A. MAIKATAKO GEN ENT 19,723,317.80 Min of Health 16 weeks
89 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency
project at Falgeri in Buji consitituency. FGPC/68/2017/VOL.1/10 S.U.B. GEN VENTURES 19,435,197.06 Min of Health 16 weeks
90 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency
project at Tuminjira in Balangu constituency, Kafin Hausa Local Government Area FGPC/80/2017/VOL.1/10 A.A. MAIKATAKO GEN ENT 19,723,317.80 Min of Health 16 weeks
91 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency
project at Fagi in Birniwa consitituency. FGPC/94/2017/VOL.1/10 S.U.B. GEN VENTURES 19,791,955.70 Min of Health 16 weeks
92 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency
project at Karwai in Ringim consitituency. FGPC/84/2017/VOL.1/10 IMAM AHMAD NIG 19,666,797.24 Min of Health 16 weeks
93 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency
project at Mudiga in Miga consitituency. FGPC/81/2017/VOL.1/10 A.H.I.K. ENTP. LTD. 19,329,482.25 Min of Health 16 weeks
94 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency
project at Dinfiduwa in Malam Madori consitituency. FGPC/86/2017/VOL.1/10 A.G.GLOBAL GOLD 19,693,479.20 Min of Health 16 weeks
95 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency
project at Dan kumbo in Maigatari consitituency. FGPC/93/2017/VOL.1/10 IMAM AHMAD NIG 19,723,317.08 Min of Health 16 weeks
96 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency
project at Hamma yayi in Dutse consitituency. FGPC/67/2017/VOL.1/10 IMAM AHMAD NIG 19,595,410.37 Min of Health 16 weeks
BALANCE C/F 1,669,676,599.44
S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD
(N)
BALANCE B/F 1,669,676,599.44
97 30/5/2017
Construction of prototype basic health clinic (BHC) across the state as constituency
project at Idanduna in Jahun consitituency. FGPC/74/2017/VOL.1/10 IMAM AHMAD NIG 19,532,487.00 Min of Health 16 weeks
98 20/04/2017
Construction of Juvenile prison, Gate Lodg, Mosque, Classroom and perimeter wall at
Babura (Additional works) FGPC/132/2016/VOL.1/15 NAILA MULTI SERV 3,769,674.07 Min of Justice
99 31/5/2017 Construction of Juma'at Prayer Mosque at Takwardawa in Roni constituency FGPC/5/2017/VOL.1/5 NA'AYI RESOURCES 8,330,898.21 Cabinet Office 12 weeks
100 31/5/2017
Construction of the daily prayer Mosque at Adanbas,kwarin dogaji and wadugur in
Ringim Constituency FGPC/129/2016/VOL.1/6 MARB ENGR & MULT 4,749,281.16 Cabinet Office 8 weeks
101 3/7/2017
Constr. of Line Drain and Culvert (620M) at Dantanoma (Layin Transformer in Gumel
Town. FGPC/100/2017/VOL.I/7 PULLAD GLOBAL LTD 20,891,855.91 Miin of Works 12 weeks
102 5/7/2017 Rehabilitation of Kwanar Dundu-Ausaya-Majawa Bulangu Road (Additional Works) FGPC/136/2016/VOL.I/35 ALREN CONST LTD 1,135,326,386.25 Miin of Works
103 5/7/2017 Constructuction of Hadejia Township roads (Additional works). FGPC/71/2013/VOL.1/35 PAACHE CONSTR. LTD. 177,848,368.32 Miin of Works
104 19/07/2017
General Renovation /Improvement Works at Taura Primary Health Care (cost
fluctuation). FGPC/15/2017/VOL.I/16 BABANDOKI GEN ENT 8,470,328.99 Mn of Health
105 19/07/2017
General Renovation /Improvement Works at Fagam Primary Health Care Gwaram (cost
fluctuation). FGPC/11/2017/VOL.I/17 NGALOMA CONS LTD 6,548,882.59 Min of Health
106 19/07/2017 General Renovation/Improvement Works at Jahun General Hospital (cost fluctuation). FGPC/229/2016/VOL.I/22 YANDUNA VENT LTD 13,278,686.28 Min of Health
107 22/08/2017 General Renovation of Government unity Commercial School Dutse FGPC/176/2017/VOL.I/20 AL-HAMSAD INVST LTD 87,655,390.48 Min of Education 20 weeks
108 28/08/2017
Constr. Of handpumps water supply scheme( Phase I-2017) as Constituency projects at
Danmarke, Bayan Gidan Lauya Jahun, Kabala masallacin Idi Jahun, Gidan Jeji, Dingari
Gidan Makada, Gidan Dango Kofar Yamma and Daradara in Jahun Constituency. FGPC/183/2017/VOL.I/17 LOYALTY PROPERTIES 5,593,350.00 Min of Water Resource 8 weeks
109 28/08/2017
Constr. Of handpumps water supply scheme( Phase I-2017) as Constituency projects at
Karkarna Sabuwa, Yankwashi Fulani, Gurjiya Gari, Wusandu and Zango in
YankwashiConstituency. FGPC/191/2017/VOL.I/17 GRANATOIDS ENG 4,007,325.00 Min of Water Resource 8 weeks
110 23/08/2017
Constr. Of Islamiyya Classroom Blocks as Constituency Project at Aci Lafia and Kudu in
Yankwashi Constituency FGPC/198/2017/VOL.I/17 GRANATOIDS ENG 6,555,993.40 Min of Education 8 weeks
111 23/08/2017
Constr. Of Islamiyya Classroom Blocks as Constituency Project at Kan Tudu Madaka and
Amaryawa in Roni Constituency FGPC/151/2017/VOL.I/10 NA'AYI RESOURCE 9,818,688.60 Min of Education 8 weeks
112 23/08/2017
Constr. Of Islamiyya Classroom Block as Constituency Project at Danya and Doko in
garki Constituency FGPC/146/2017/VOL.I/2017 MMZ GARKI CONST 6,531,598.05 Min of Education 8 weeks
113 22/08/2017
Constr. Of 3No.Classrooms Blocks, Administration Block, 2no 6-Seater VIP Toilet and
Provision of 1No. Hand Pump at Government Day Secondary School Danmasara, Dutse. FGPC/175/2017/VOL.I/20 MUTUAL INFRASTRU 28,008,767.60 Min of Education 8 weeks
BALANCE C/F 3,216,594,561.35
S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD
(N)
BALANCE B/F 3,216,594,561.35
114 13/09/2017
Extention of Electricity at Bello Bayi, Agumau and Maman Wale Quarters in Hadejia and
Purchase of Thirty Five (35) Number 2.5KVA Gasoline Generators for Distrubution to
Mosques in Hadejia Constituency FGPC/201/2017/VOL.I/17 XTRAXX 99 INTGRATED 54,237,645.52 Min of Works 16 weeeks
115 20/9/2017 Extention of Perimeter wall fencing at (MDI), Dutse (variation works) FGPC/38/2014/VOL.I/30 BABANDOKI GEN ENT 9,553,510.00 Head of Service
116 16/8/2017 Bituminous felt roofing and some renovations of Dutse Central mosque JG/CRS/RA/ADM/12/III Equishare Nig. Ltd. 12,552,135.05 SSG office 6 weeks
117 17/08/2017
Constr. Of Prototype basic Health Clinic (BHC) Across the State as Constituency Project
at Gasakoli in Babura Local Government Area. (change of site) FGPC/90/2017/VOL.I/14 BABANDOKI GEN ENT 19,225,138.00 Min of Health 16 Weeks
118 21/08/2017
Constr. Of Prototype basic Health Clinic (BHC) Across the State as Constituency Project
at Buduru in Garki Local Government Area. (change of site) FGPC/91/2017/VOL.I/14 A.H.I.K ENT LTD 19,304,132.10 Min of Health 16 Weeks
119 18/08/2018
Constr. Of Prototype basic Health Clinic (BHC) Across the State as Constituency Project
at Madobi in Dutse Local Government Area. (change of site) FGPC/67/2017/VOL.I/14 IMAM AHMAD NIG LTD 19,595,410.37 Min of Health 16 Weeks
120 21/08/2018
Constr. Of Prototype basic Health Clinic (BHC) Across the State as Constituency Project
at Arbus in Kaugama Local Government Area. (change of site) FGPC/75/2017/VOL.I/14 S.U.B GEN VENTURE 19,523,847.08 Min of Health 16 Weeks
121 21/08/2018
Constr. Of Prototype basic Health Clinic (BHC) Across the State as Constituency Project
at Rabadi in Fagam, Gwaram Local Government Area. (change of site) FGPC/69/2017/VOL.I/14 A.A MAIKATAKO GEN ENT 19,723,317.80 Min of Health 16 Weeks
122 11/8/2017 Constr. Of New 250 Bed Specialist Hospital in Hadejia FGPC/131/2017/VOL.I/8 PHILKO LIMITED 1,593,314,294.25 Min of Health 16 months
123 6/9/2017 Renovation Works at New School of Nursing Hadejia FGPC/199/2017/VOL.I/6 XTRAX 99 INT SERV LTD 58,681,266.23 Min of Health 12 weeks
124 21/8//2017
Renovation / Improvement works and Water Scheme at Kafin Hausa General Hospital
(Additional Work/Variation) FGPC/99/2016/VOL.I/25 MOJAZ CONST NIG LTD 19,458,546.32 Min of Health
125 7/8/2017
Constr. Of Solar Powered Water Supply Schemes (Phase I) as Constituency Project at
Lafiya and Adiyani in Guri Constituency FGPC/119/2017/VOL.I/12 AYH INVEST COMP LTD 13,843,200.00 Min of Water Resources 8 Weeks
126 7/8/2017
Constr. Of Solar Powered Water Supply Schemes (Phase I) as Constituency Project at
Farure in Gwiwa Constituency FGPC/114/2017/VOL.I/12 THAQIB VENTURE LTD 6,967,800.00 Min of Water Resources 8 Weeks
127 7/8/2017
Constr. Of Solar Powered Water Supply Schemes (Phase I) as Constituency Project at
Kadira in Guri Constituency FGPC/112/2017/VOL.I/12 AYH INVEST COMP LTD 6,921,600.00 Min of Water Resources 8 Weeks
128 7/8/2017
Constr. Of Solar Powered Water Supply Schemes (Phase I) as Constituency Project at
Dunari, Shayya and Majeri in Malam, Madori Constituency FGPC/123/2017/VOL.I/12 LIMIS BROTHERS & CO 20,882,610.00 Min of Water Resources 8 Weeks
BALANCE C/F 5,110,379,014.07
S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD
(N)
BALANCE B/F 5,110,379,014.07
129 7/8/2017
Constr. Of Solar Powered Water Supply Schemes (Phase I) as Constituency Project at
Dabawa and Damfa in Babura Constituency FGPC/118/2017/VOL.I/12 MUFABAMEX CON LTD 13,921,740.00 Min of Water Resources 8 Weeks
130 7/8/2017
Constr. Of Solar Powered Water Supply Schemes (Phase I) as Constituency Project at
Kurjeni, Kuduje and Rurau in Gwiwa Constituency FGPC/130/2017/VOL.I/12 MANHAF CONS NIG LTD 20,903,400.00 Min of Water Resources 8 Weeks
131 7/8/2017
Constr. Of Solar Powered Water Supply Schemes (Phase I) as Constituency Project at
Unguwar Bako and Gayawa in Garki Constituency FGPC/111/2017/VOL.I/12 ADZ GLOBAL SERV LTD 13,666,020.00 Min of Water Resources 8 Weeks
132 7/8/2017
Constr. Of Solar Powered Water Supply Schemes (Phase I) as Constituency Project at
Marye in Birniwa Constituency FGPC/110/2017/VOL.I/12 ADZ GLOBAL SERV LTD 6,968,010.00 Min of Water Resources 8 Weeks
133 7/8/2017
Constr. Of Solar Powered Water Supply Schemes (Phase I) as Constituency Project at
Afarmo and Tigima in Auyo Constituency FGPC/107/2017/VOL.I/12 ADZ GLOBAL SERV LTD 13,936,020.00 Min of Water Resources 8 Weeks
134 7/8/2017
Constr. Of Solar Powered Water Supply Schemes (Phase I) as Constituency Project at
Baturiya and Tarabu in Kirikasamma Constituency FGPC/108/2017/VOL.I/12 ADZ GLOBAL SERV LTD 13,936,020.00 Min of Water Resources 8 Weeks
135 7/8/2017
Constr. Of Solar Powered Water Supply Schemes (Phase I) as Constituency Project at
Kiyawa Town in kiyawa Constituency FGPC/109/2017/VOL.I/12 ADZ GLOBAL SERV LTD 6,968,010.00 Min of Water Resources 8 Weeks
136 7/8/2017
Constr. Of Solar Powered Water Supply Schemes (Phase I) as Constituency Project at
Kundu in Taura Constituency FGPC/115/2017/VOL.I/12 NUSHE BUSINESS RESOR 6,960,000.00 Min of Water Resources 8 Weeks
137 7/8/2017
Constr. Of Solar Powered Water Supply Schemes (Phase I) as Constituency Project at
Bekarya and Gusau in Gumel Constituency FGPC/113/2017/VOL.I/12 JAG & H INT SERVICES 13,921,740.00 Min of Water Resources 8 Weeks
138 7/8/2017
Constr. Of Solar Powered Water Supply Schemes (Phase I) as Constituency Project at
Kawari in Gwaram Constituency FGPC/122/2017/VOL.I/12 AZZIDS NIG LTD 6,982,500.00 Min of Water Resources 8 Weeks
139 7/8/2017
Constr. Of Solar Powered Water Supply Schemes (Phase I) as Constituency Project at
Nassarawa in Gwaram Constituency FGPC/116/2017/VOL.I/12 AZZIDS NIG LTD 6,982,500.00 Min of Water Resources 8 Weeks
140 7/8/2017
Constr. Of Solar Powered Water Supply Schemes (Phase I) as Constituency Project at
Kigin in Auyo Constituency FGPC/127/2017/VOL.I/12 K MANU GEN CONST 6,968,010.00 Min of Water Resources 8 Weeks
BALANCE C/F 5,242,492,984.07
S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD
(N)
BALANCE B/F 5,242,492,984.07
141 7/8/2017
Constr. Of Solar Powered Water Supply Schemes (Phase I) as Constituency Project at
Bareye and Jijjigawa in Gagarawa Constituency FGPC/117/2017/VOL.I/12 A.A ALJAZEERA 13,941,260.00 Min of Water Resources 8 Weeks
142 7/8/2017
Constr. Of Solar Powered Water Supply Schemes (Phase I) as Constituency Project at
Kabara, Bagaware and Kandawa Bura in Maigatari Constituency FGPC/125/2017/VOL.I/12 A.U SARO GLOBAL RES 20,882,610.00 Min of Water Resources 8 Weeks
143 7/8/2017
Constr. Of Solar Powered Water Supply Schemes (Phase I) as Constituency Project at
Murdan Kasa, Karkarna Arewa and Sabowa in Yankwashi Constituency FGPC/120/2017/VOL.I/12 GRANTOIDS ENG SERV 20,834,100.00 Min of Water Resources 8 Weeks
144 7/8/2017
Constr. Of Solar Powered Water Supply Schemes (Phase I) as Constituency Project at
Narba in Jahun Constituency FGPC/106/2017/VOL.I/12 LOYALTY PROPERTIES LTD 6,786,150.00 Min of Water Resources 8 Weeks
145 7/8/2017
Constr. Of Solar Powered Water Supply Schemes (Phase I) as Constituency Project at
Nafadawa in Miga Constituency FGPC/105/2017/VOL.I/12 LOYALTY PROPERTIES LTD 6,943,378.50 Min of Water Resources 8 Weeks
146 7/8/2017
Constr. Of Solar Powered Water Supply Schemes (Phase I) as Constituency Project at
Gatare in Birniwa Constituency FGPC/104/2017/VOL.I/12 LOYALTY PROPERTIES LTD 6,889.050.00 Min of Water Resources 8 Weeks
147 7/8/2017
Constr. Of Solar Powered Water Supply Schemes (Phase I) as Constituency Project at
Marma in Kirikasamma Constituency FGPC/103/2017/VOL.I/12 LOYALTY PROPERTIES LTD 6,943,387.00 Min of Water Resources 8 Weeks
148 7/8/2017
Supply of Solar Powered Water Supply pumps (Phase I) as Constituency Project at Jana,
Amaguwa, Gidan Lage, Sankara and Kwandari in Ringim Constituency FGPC/102/2017/VOL.I/12 MARB ENG & MULTI SERV 5,000,047.00 Min of Water Resources 8 Weeks
149 11/8/2017
Constr. Of Solar Powered Water Supply Schemes (Phase I) as Constituency Project at
Kanya Babba, Bata and Fadi at Kanya Babba Constituency in Babura Constituency FGPC/121/2017/VOL.I/13 DEETECH NIG LTD 21,424,662.00 Min of Water Resources 8 Weeks
150 28/8/2017
Constr. Of HandPump Water Supply Scheme (Phase I-2017) as Constituency Project at
Kwarare kauye ( Yola Ward) and Rorau Fulani ( Rorau Ward) in Gwiwa Constituency FGPC/180/2017/VOL.I/17 THAQIB VENT NIG LTD 1,600,200.00 Min of Water Resources 8 Weeks
151 28/8/2017
Constr. Of Hand Pumps Supply Schemes (Phase I-2017) as Constituency Project at Kofar
Gabas Gwaram, Barebari Makabarta Sabuwa, Auyakawa Gidan Dutse Gwaram, Tambo
Gwaram and Sumangara in Gwaram Constituency FGPC/185/2017/VOL.I/17 AZZIDS NIG LTD 7,076,160.00 Min of Water Resources 8 Weeks
BALANCE C/F 5,353,924,938.57
S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD
(N)
BALANCE B/F 5,353,924,938.57
152 28/8/2017
Constr. Of Hand Pumps Water Supply Schemes (Phase I-2017) as Constituency Project
at Matsaro, Sabon Garu, Dubantu, Gabari, Layin Alh Makeri Sabon Garu, Kantin Waje
Bayan Vocational, Yayari, Atafi, Chadi Anguwar Madaki, Dallah, Bayan NTA, Bello Bayi,
Makara Hutar Duhu, Matsaro Layin Danbaba, Rumfa, Hudu and Charbin Barau in Hadejia
Constituency FGPC/184/2017/VOL.I/17 A. BARDE GLOBAL CON 24,928,000.00 Min of Water Resources 8 Weeks
153 28/8/2017
Constr. Of Handpumps Water Supply Schemes (Phase I-2017) as Constituency Project at
Tsaba, Dabi, Badage Gabas, Tagwani, Jana, Danlare, Alhaji Kayi and Sabuwar Amaguwa
in Ringim Constituency FGPC/181/2017/VOL.I/17 MARB ENG & MULTI SERV 8,001,000.00 Min of Water Resources 8 Weeks
154 28/8/2017
Constr. Of Hand Pumps Water Supply Scheme (Phase I-2017) as Constituency Project at
Gidan Ja'o Hardo Kwalle, Matsatsagi, Baushe Sango, Inwala, Tsinke, Musa Sayya, Hardo
Sani, Dausama, Tarana Sulani and Kiriha in Maigatari Constituency FGPC/182/2017/VOL.I/17 NADADA VENTURES NIG 8,809,762.50 Min of Water Resources 8 Weeks
155 28/8/2017
Constr. Of Hand Pumps Water Supply Scheme (Phase I-2017) as Constituency Project at
Unguwar Aliko (Jigawa Ward) Grave Yard Bayan Asibiti Babura, Unguwar Makeri
Insharuwa and dan Amale Fulani in Babura Constituency FGPC/192/2017/VOL.I/17 MUFABAMEX CONCEPT 3,202,000.00 Min of Water Resources 8 Weeks
156 28/8/2017
Constr. Of Water Collection Points (Phase I-2017) as Constituency Project at Kuloniya,
Yan Kwana-Kwana Mele, Maidabara and Karkasara in Gumel Constituency FGPC/197/2017/VOL.I/17 JAG & H INT SERVICES 6,560,835.00 Min of Water Resources 8 Weeks
157 28/8/2017
Constr. Of Water Collection Points (Phase I-2017) as Constituency Project at Garoro,
Batali and Majiya Bakin Hanya in Taura Constituency FGPC/190/2017/VOL.I/17 NUSHE BUSINESS RES 2,401,717.50 Min of Water Resources 8 Weeks
158 28/8/2017
Constr. Of HandPumps Water Supply Schemes (Phase I-2017) as Constituency Project at
Fulanin Garin Barka Arewa , Fulanin Dan Ama Arewa, Danfarantama, Fulanin Barikin
Faka and Bekarya in Gumel Constituency FGPC/195/2017/VOL.I/17 JAG & H INT SERVICES 4,003,125.00 Min of Water Resources 8 Weeks
159 28/8/2017
Constr. Of HandPumps Water Supply Schemes (Phase I-2017) as Constituency Project at
Kundashe (Muku Ward) Jaya (Garki Ward) and Government girls Secondary School Garki
in Garki Constituency FGPC/194/2017/VOL.I/17 ADZ GLOBAL SERVICES 2,400,300.00 Min of Water Resources 8 Weeks
160 28/8/2017
Constr. Of HandPumps Water Supply Schemes (Phase I-2017) as Constituency Project at
Barka (Andaza Ward), Rigar Amina Ward. Dadin Duniya Andaza , Firera (Andaza Ward),
Yar Auta (Garko Ward), Gidan Rabo ( Fake Ward) Jigawar Kaba (Katanga Ward) Masaya
(Fake Ward) Adakawa ( Andaza Ward) Kanlaha Guduba ( Katuka Ward) Unguwar Madaki
( Katuka Ward) gabashi ( Andaza Ward) Bushe (Andaza Ward) and Gidan Malu in Kiyawa
Constituency FGPC/196/2017/VOL.I/17 ADZ GLOBAL SERVICES 11,201,400.00 Min of Water Resources 8 Weeks
161 31/8/2017
Constr. Of HandPumps Water Supply Schemes (Phase I-2017) as Constituency Project at
Fagoji, Gundun Mazare, Bambam, Gida Dubu, Katujen Gaba and gidan Gamai in Dutse
Constituency FGPC/193/2017/VOL.I/17 TALAKU INT SERV LTD 4,794,300.00 Min of Water Resources 8 Weeks
162 7/9/2017
Constr. Of HandPumps Water Supply Schemes (Phase I-2017) as Constituency Project at
Chiroma, Kupsa Sabuwa Ujiwa, Rigar Mungurum, Tudu Birniwa and Dambin Diginsa in
Birniwa Constituency FGPC/136/2017/VOL.I/15 MUSFAT GEN ENV 4,607,190.00 Min of Water Resources 8 Weeks
BALANCE C/F 5,434,834,568.57
S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD
(N)
BALANCE B/F 5,434,834,568.57
163 24/08/2017
Constr. Of 17NO. HandPumps Water Supply Schemes (Phase III-2016) as Constituency Project at
Tsakatai Fulani( Budur Ward) Dakace(Doko Ward) Koguran Sabuwa ( Doko Ward), Kofar Gidan
Liman ( Garki Ward) Bayan Gdian Sarkin Bai (Garki Ward), Zankuwa Fulani ( Garki Ward),
Sabuwar Senior Secondary School ( Garki Ward), Zaidawa (Gwarzo Ward), Kurgunguma ( Gwarzo
Ward), Gidan Gone (Siyori Ward) Wailari( Jirima Ward) Ufala Fulani (Rafin Marke Ward) Hardon
Nagona Faggen Gawo( Kore Ward) Gidan Boza (kore Ward) Abudawa (Muku Ward), Unguwar
Shage ( Kanya Ward) and Wailari (Jirima Ward) in Garki Constituency FGPC/178/2017/VOL.I/7 THAQIB VENT NIG LTD 9,945,000.00 Min of Water Resources 8 Weeks
164 28/08/2017
Constr. Of HandPumps Water Supply Schemes (Phase I-2017) as Constituency Proeject at G/
Mutari Ali Hardo Amad Macce, Amanga Gari, Gidan Kwajale, Hardo Chiroma, G/Jafan Sa'idu
Hardo, Yantuba, Unguwar Babangida D/Danra, G/Musa Shanu Hardo, Gidan Wakili Isah Hardo
Matto, Dankwabro Near Madoji, Hardo Dambo Fulanin Babamato, Gidan Hardo Isa Kyarra Gari in
Sule-Tankarkar Constituency FGPC/189/2017/VOL.I/17 MANHAF CONS NIG LTD 9,435,816.00 Min of Water Resources 8 Weeks
165 12/9/2017
Constr. Of HandPumps Water Supply Schemes (Phase I-2017) as Constituency Proeject at Rigar
Buba Madugu, Safaman Ganji, Jangwan Babale, Rigar Mallam Yaya Zugobiya, Rigar Mallam Buba,
Rigar hardo Auduru, Zugobiya, Bodala, Rigar lamido Manu, Rigar lamido Ruwa, Dagana and
Margadu Sabon Fegi in Guri Constituency FGPC/188/2017/VOL.I/19 A.Y.H INVST COMP LTD 9,597,420.00 Min of Water Resources 8 Weeks
166 25/08/2017
Upgarding and Conversion of 7No Motorized Water Supply Schemes to Solar Powered Water
Supply Schemes at Dundubus, Kafin Gana, Danmakama, Marma, Bulangu, Dansure and Jigawa
Town. FGPC/179/2017/VOL.I/6 SIMS GLOBAL RESOURCE 90,265,107.03 Min of Water Resources 16 weeks
167 29/08/20017
Constr. Of HandPumps Water Supply Schemes as Constituency Project at Falkin Jalo Nasarawa,
Fulanin Kuka uku, Fulanin Liman Mado, Fulanin Gangara and Fulanin Dan'ama Gabas in Gumel
Constituency FGPC/80/2016/VOL.I/10 JAG & H INT SERVICES 2,742,600.00 Min of Water Resources 8 Weeks
168 14/9/2017
Constr. Of 2no. Bore-hole and Pipeline route of Water Supply from Matanfada pump station to
(GSS) Roni in Roni. FGPC/124/2017/VOL.I/12 NE Global Eng. 12,400,890.80 Min of Water Resources 8 Weeks
169 7/8/2017
Constr. Of Solar Powered Water Supply Scheme (Phase I) as Constituency Project at Digawa
(Danzomo ward) in Sule T/karkar Constituency. FGPC/202/2017/VOL.I/12 Bulangu Dril l ing Services 6,967,800.00 Min of Water Resources 8 Weeks
170 23/08/2017
Constr. Of Islamiyya Classroom Blocks as Contituency Project at Mariri, Kangire and Nafara in
Birnin Kudu Constituency FGPC/148/2017/VOL.I/10 NUSHE BUSINESS RES 9,819,816.00 SUBEB 6 Weeks
171 7/9/2017
Constr. Of Islamiyya Classroom Blocks 2017 Constituency Project Phase I at Meso and Diginsa in
Birniwa Local Government Area. FGPC/153/2017/VOL.I/10 MUSFAT GEN ENTER 6,536,639.40 SUBEB 5 Weeks
172 23/08/2017
Constr. Of Islamiyya Classroom Blocks as Contituency Project at Malam Bako Gari and Togai in
Sule Tankarkar Constituency FGPC/145/2017/VOL.I/10 MANHAF GLOBAL CONS 6,538,905.86 SUBEB 5 Weeks
173 23/08/2017 Constr. Of Islamiyya Classroom Blocks as Contituency Project at Yamidi in Auyo Constituency FGPC/150/2017/VOL.I/10 A.U.A & SONS NIG LTD 3,280,666.90 SUBEB 4 Weeks
174 23/08/2017
Constr. Of Islamiyya Classroom Blocks as Contituency Project at Gurfai and Babura Tsallake in
Babura Constituency FGPC/147/2017/VOL.I/10 MUFABAMEX CONCEPT LTD 6,490,859.80 SUBEB 5 Weeks
175 23/08/2017
Constr. Of Islamiyya Classroom Blocks 2017 Constituency Project Phase I at Garin Gambo and
Karkasara in Gumel Local Government Area. FGPC/144/2017/VOL.I/10 JAG & H INT SERVICES 6,492,754.80 SUBEB 5 Weeks
BALANCE C/F 5,615,348,845.16
S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD
(N)
BALANCE B/F 5,615,348,845.16
176 23/08/2017
Constr. Of Islamiyya Classroom Blocks as Contituency Project at Kantudu, Bandutse,
Kabori Gabas, Sha'iskawa and Fatare in Kazaure Constituency FGPC/152/2017/VOL.I/10 DUTSEN TAURA CONST 19,650,342.00 SUBEB 10 Weeks
177 23/08/2017
Constr. Of Islamiyya Classroom Blocks as Contituency Project at Inguwar Tama in Gwiwa
Constituency FGPC/149/2017/VOL.I/10 MANHAF GLOBAL CONS 3,268,467.76 SUBEB 5 Weeks
178 16/08/2017
Constr. Of Islamiyya Classroom Blocks 2017 Constituency Project Phase I at Matarar
Galadima, Gamji and Madugunari in Kiri-Kasamma Local Government Area. FGPC/137/2017/VOL.I/9 ALH. UMAR BABANDOKI 9,774,818.04 SUBEB 7 Weeks
179 16/08/2017
Constr. Of Islamiyya Classroom Blocks 2017 Constituency Project Phase I at Abujan
Amare, Bello Bayi Islamiyya, Garko and Malam Abare Islamiyya in Hadejia Local
Government Area. FGPC/140/2017/VOL.I/9 NA-BAKWAI GEN ENT LTD 13,118,021.60 SUBEB 7 Weeks
180 16/08/2017
Constr. Of Islamiyya Classroom Blocks 2017 Constituency Project Phase I at Sabuwar
Daula, Zango and Alfa in Miga Local Government Area. FGPC/138/2017/VOL.I/9 A.BARDE GLOBAL CON 9,833,550.03 SUBEB 6 Weeks
181 16/08/2017
Constr. Of Islamiyya Classroom Blocks 2017 Constituency Project Phase I at Malarin
Gama and Matsa in Malam Madori Local Government Area. FGPC/142/2017/VOL.I/9 AZZIDS NIG ENT LTD 6,519,858.46 SUBEB 5 Weeks
182 16/08/2017
Constr. Of Islamiyya Classroom Blocks 2017 Constituency Project Phase I at Babebara,
Kazaurawa, Wurya, wurya and Zangon Nagogo in Gwaran Local Government Area. FGPC/143/2017/VOL.I/9 AZZIDS NIG ENT LTD 16,321,387.00 SUBEB 7 weeks
183 17/08/2017
Constr. Of Islamiyya Classroom Blocks 2017 Constituency Project Phase I at kadoma ,
Kularan and Gidan Gamji in Jahun Local Government Area. FGPC/141/2017/VOL.I/9 LOYALTY PROPERTIE LTD 9,797,397.75 SUBEB 6 Weeks
184 16/08/2017
Constr. Of Islamiyya Classroom Blocks 2017 Constituency Project Phase I at Bakin
Jeji,Jutai, Ijje and G/sarkin Aska in Dutse Local Government Area. FGPC/139/2017/VOL.I/9 ALKASAM JANNAH NIG LTD 13,117,868.10 SUBEB 6 Weeks
185 24/08/2017
Constr. of a block 3 classrooms, an Admin Block, Constr. Of 2No. 6-Seater VIP Toilets,
Provision of 1No. Hand Pump and constr. Of a Block of Laboratory at GGDSS Gumel FGPC/163/2017/VOL.I/20 DANGATA MEMORIAL 38,086,803.23 Min of Education 12 Weeks
186 24/08/2017
Constr. of a block 3 classrooms, an Admin Block, Constr. Of 2No. 6-Seater VIP Toilets,
Provision of 1No. Hand Pump and constr. Of a Block of Laboratory at GGDSS Dutse FGPC/162/2017/VOL.I/20 BABANDOKI GEN ENT LTD 37,962,436.27 Min of Education 12 Weeks
BALANCE C/F 5,792,799,795.40
S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD
(N)
BALANCE B/F 5,792,799,795.40
187 24/08/2017
Constr. of a block 3 classrooms, an Admin Block, Constr. Of 2No. 6-Seater VIP Toilets,
Provision of 1No. Hand Pump. FGPC/159/2017/VOL.I/20 BABANDOKI GEN ENT LTD 29,031,555.81 Min of Education 12 Weeks
188 24/08/2017
Constr. Of a block of 3-Class Rooms, Constr.. Of an Admin, Block, Constr. Of 2No. 6
Seater VIP Toilets and Provision of 1No. Hand Pump at GDSS Shagari Quarters, Hadejia FGPC/156/2017/VOL.I/22 DANGATA MEMORIAL 29,008,767.70 Min of Education 12 Weeks
189 24/08/2017
Constr. Of a block of 3-Class Rooms, Constr.. Of an Admin, Block, Constr. Of 2No. 6
Seater VIP Toilets and Provision of 1No. Hand Pump at GGDSS Babura FGPC/157/2017/VOL.I/12 DANGATA MEMORIAL 31,487,476.82 Min of Education 12 Weeks
190 24/08/2017
Constr. Of a block of 3-Class Rooms, Constr.. Of an Admin, Block, Constr. Of 2No. 6
Seater VIP Toilets and Provision of 1No. Hand Pump at GGDSS Kiyawa FGPC/155/2017/VOL.I/20 NGALOMA CONST LTD 28,851,997.41 Min of Education 2 Weeks
191 24/08/2017
Constr. Of a block of 3-Class Rooms, Constr.. Of an Admin, Block, Constr. Of 2No. 6
Seater VIP Toilets and Provision of 1No. Hand Pump at GGDSS Roni FGPC/158/2017/VOL.I/20 SABON GARIN YAYA 29,141,489.44 Min of Education 12 Weeks
192 24/08/2017
Constr. Of a block of 3-Class Rooms, Constr.. Of an Admin, Block, Constr. Of 2No. 6
Seater VIP Toilets and Provision of 1No. Hand Pump at GGDSS K/Hausa FGPC/160/2017/VOL.I/19 IMAM AHMAD NIG LTD 29,141,489.44 Min of Education 12 Weeks
193 24/08/2017
Constr. Of a block of 3-Class Rooms, Constr.. Of an Admin, Block, Constr. Of 2No. 6
Seater VIP Toilets and Provision of 1No. Hand Pump and Constr. Of a Block of
Laboratory at GGDSS Kazaure FGPC/161/2017/VOL.I/19 IMAM AHMAD NIG LTD 38,086,803.23 Min of Education 12 Weeks
194 24/08/2017
Constr. Of a block of 3-Class Rooms, Constr.. Of an Admin, Block, Constr. Of 2No. 6
Seater VIP Toilets and Provision of 1No. Hand Pump and Constr. Of a Block of
Laboratory at GGDSS Birnin Kudu FGPC/164/2017/VOL.I/8 SABON GARIN YAYA 38,086,803.23 Min of Education 12 Weeks
195 24/08/2017 Constr. Of Ten (10No) Blocks 6-Seater VIP Latrines at G.U.S.C Dutse FGPC/168/2017/VOL.I/16 NGALOMA CONST LTD 23,584,995.60 Min of Education 12 Weeks
196 24/08/2017 Constr. Of Twelve (12No) Hand Pumps to Schools at Various Locations FGPC/154/2017/VOL.I/19 BABANDOKI GEN ENT 9,344,745.00 Min of Education 12 Weeks
197 21/08/2017
Renovation of Science /ICT Laboraties at 8No. Centre of Excellence in the state (GGUSS
Kazaure, GUSS Maigatari, GDSS Babura, GGUSS M/Madori, GDSS Garun Gabas, GDSS
Bulangu, GUSS Basirka and GGUSS Gwaram). FGPC/172/2017/VOL.I/20 MUGIN INVT LTD 41,352,400.79 Min of Education 12 Weeks
198 14/08/2017
Variation for Variation / Additional Workls in Respect of Lott II&III at Sule Lamido
University, Kafin Hausa. FGPC/65/2013/VOL.I/ 27 DATUM CONST NIG LTD 238,484,947.28 Min of Education
199 31/08/2017
Constr. Of Line Drain and Culvert (620M) at Dantanoma (Layin Transformer) in Gumel
Town ( Additional Works). FGPC/100/2017/VOL.I/25 PULLAD CONSULTANT LTD 18,993,645.63 Min of Works 6 weeks
200 8/8/2017 Rehabilitation and Reconnection of Taura-Gujungu-Ajaura and Chuwasu- Chakwakwaiwa ITC LinesFGPC/128/2017/VOL.I/17 AL-MAJEED CONSTR 29,567,211.07 Min of Works 12 Weeks
201 11/9/2017 Electrification of Kwadiya town in Dutse LGA. FGPC/200/2017/VOL.I/6 Al-sabur Global Links 21,304,075.72 Min of Works 6 weeks
BALANCE C/F 6,428,268,199.57
S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD
(N)
BALANCE B/F 6,428,268,199.57
202 19/10/2017 Constr. of Takur -Jaudi feeder road (4.5km) FGPC/242/2017/VOL.I/8 A.Y.A. Logistics & Constr. Ltd. 78,896,311.20 Min. of Works 12 weeks
203 19/10/2017 Constr. of Limawa-Galamawa second coat surface dressed road (2.2km) FGPC/243/2017/VOL.I/8 A.Y.A. Logistics & Constr. Ltd. 87,185,923.24 Min. of Works 16 weeks
204 24/10/2017 Constr. of Storm Water Drainages at Chamo town in Dutse LGA (3000M) FGPC/246/2017/VOL.I/8 Loyalty Properties Ltd. 91,450,000.00 Min. of Environment 12 weeks
205 24/10/2017 Constr. of Storm Water Drainages at Galamawa town in Dutse LGA (1,600M) FGPC/247/2017/VOL.I/8 Loyalty Properties Ltd. 48,622,000.00 Min. of Environment 12 weeks
206 24/10/2017 Constr. of Storm Water Drainages at Garu town in Dutse LGA FGPC/248/2017/VOL.I/8 A. Amadu Maikatako 26,132,000.00 Min. of Environment 12 weeks
207 24/10/2017 Constr. of Storm Water Drainages at Yalleman town in Kaugama LGA FGPC/249/2017/VOL.I/8 A. Amadu Maikatako 56,839,408.01 Min. of Environment 16 weeks
208 16/10/2017
Constr. of five (5) Daily prayer Mosques at Makangawa, Tafarnuwa, Sugungun and
Unguwar Duhuwa in Garki Constituency. FGPC/226/2017/VOL.I/6 MMZ Garki Gen. Entp. 8,243,957.40 Cabinet office 12 weeks
209 16/10/2017
Constr. of five (5) Daily prayer Mosques at Kasarwa and Jangiwa in Birniwa
Constituency. FGPC/233/2017/VOL.I/6 Musfat Gen. Investment 4,116,102.90 Cabinet office 6 weeks
210 16/10/2017
Constr. of five (5) Daily prayer Mosques at Gidan Mutari, Fulanin Harbo, Danmodi Gari
and Hammado in Sule Tankarkar Constituency. FGPC/237/2017/VOL.I/6 Munhab Global Ventures 6,543,114.75 Cabinet office 6 weeks
211 16/10/2017
Constr. of five (5) Daily prayer Mosques at Gawon Dogari, Garko Chediya and Makarar
Duhu in Hadejia Constituency. FGPC/232/2017/VOL.I/6 Alh. Umaru Babandoki 6,180,378.75 Cabinet office 8 Weeks
212 25/10/2017
Constr. of five (5) Daily prayer Mosques at Gada Rumawa, Sabaru Fanda and Gada Gabas
in Kazaure Constituency. (A) FGPC/207/2017/VOL.I/6 Yanduna Ventures 6,178,879.36 Cabinet office 8 Weeks
213 25/10/2017 Constr. of Friday prayer mosque at Gada yamma in Kazaure Constituency. (B) FGPC/207/2017/VOL.I/6 Yanduna Ventures 46,882,392.01 Cabinet office 12 Weeks
214 2/11/2017 General Renov./Improvement works at Roni Primary Health Centre (PHC) FGPC/253/2017/VOL.I/7 Yusmatech Invest. Nig. Ltd. 26,766,366.36 Min. of Health 12 Weeks
215 2/11/2017 General Renov./Improvement works at Kanya Babba Primary Health Centre (PHC) FGPC/252/2017/VOL.I/8 Math Global Invest. Ltd. 27,609,456.17 Min. of Health 12 Weeks
216 2/11/2017 General Renov./Improvement works at Kaugama Primary Health Centre (PHC) FGPC/251/2017/VOL.I/7 S/garin Yaya Nig. Ltd. 35,574,703.10 Min. of Health 12 Weeks
217 2/11/2017 General Renov./Improvement works at Kazaure Primary Health Centre (PHC) FGPC/250/2017/VOL.I/8 Babandoki Gen. Entp. 48,714,143.31 Min. of Health 16 weeks
218 2/11/2017 Supply and Installation of Solar Powered Lightening System at Dutse Gen. Hospital FGPC/254/2017/VOL.I/7 SIMS Global Resources 27,835,303.13 Min. of Health 8 Weeks
219 22/11/2017 Rehab. Of Karnaya to Dundubus ITC Line in Dutse LGA. FGPC/257/2017/VOL.I/7 Yalwa Oil and Gas Ltd. 5,114,056.50 Min. of Works 8 Weeks
220 22/11/2017
Township Distrubution Network and Inter town Connections at Nasarawa and
Extension from Maidubara to Garin Malam in Gumel LGA.(ITC & TDN Electrification) FGPC/259/2017/VOL.I/8 JAG & H Integrated Serv. Ltd. 43,268,605.12 Min. of Works 12 Weeks
221 22/11/2017 Electrification projects at Daraji (1) and Daraji (II) in Gwiwa LGA. FGPC/258/2017/VOL.I/7 Jignaj Global Constr. Ltd. 21,183,723.27 Min. of Works 8 Weeks
222 20/11/2017 Re-constr. of Unity Pentagon Roundabout-Disina Junction road FGPC/256/2017/VOL.I/12 Retercha Co. Ltd. 70,942,298.85 Min. of Works 8 Weeks
223 16/10/2017
Constr. of Five (5) Daily Prayer Mosques at Dawan gawo and Karkarna in Yankwashi
Constituency. FGPC/238/2017/VOL.I/6 Granitoids Eng. Services 6,148,095.00 Cabinet office 6 weeks
224 16/10/2017
Constr. of Five (5) Daily Prayer Mosques at Dawan gawo and Karkarna in Gumel
Constituency. FGPC/225/2017/VOL.I/6 JAG & H Integrated Serv. Ltd. 4,120,393.20 Cabinet office 6 weeks
BALANCE C/F 7,212,815,811.20
S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD
(N)
BALANCE B/F 7,212,815,811.20
225 9/11/2017
Constr. of Five (5) Daily Prayer Mosques at Dausayi, Sabon Garin Dandi and Suntilmawa
in Kazaure Constituency. (A) FGPC/206/2017/VOL.I/9 MARB Eng. & Multy Serv. 6,192,036.90 Cabinet office 6 weeks
226 9/11/2017
Constr. of FridayPrayer Mosques at Tsabare, Dandi, Tofa and Gidan Sarki (Friday
Mosque) in Kazaure Constituency. (B) FGPC/206/2017/VOL.I/9 MARB Eng. & Multy Serv. 24,779,470.59 Cabinet office 12 weeks
227 16/10/2017 Constr. of Friday Prayer Mosques at Nasarawa in Gumel Constituency. FGPC/220/2017/VOL.I/6 JAG & H Integrated Serv. Ltd. 15,046,340.35 Cabinet office 12 weeks
228 30/11/2017 Constr. Of Official Residence of the Head of Civil Service (HOS) (Additional works) FGPC/40/2016/VOL.I/13 Design Three-Sixty Ltd. 18,705,258.38 Min. of Land
229 30/11/2017
Constr. Of Official Residence of the Secretary to the State Government (SSG)
(Additional works) FGPC/39/2016/VOL.I/13 Sahal-Bin Nig. Ltd. 25,724,108.93 Min. of Land
230 30/11/2017 Constr. Of 6no. Junior Staff Qtrs. At GGASS Danzomo (Variation/Fluctuation) FGPC/194/2016/VOL.I/12 Mojaz Constr. Ltd. 2,324,232.90 Min. of Land
231 30/11/2017 Constr. Of 6no. Junior Staff Qtrs. At GGASS Danzomo (Variation/Fluctuation) FGPC/195/2016/VOL.I/12 Mojaz Constr. Ltd. 2,324,232.90 Min. of Land
232 5/12/2017 Electrification project at Rimi and Makera in Bulangu Constituency of Kafin Hausa LGA FGPC/260/2017/VOL.I/7 Kawu Nig. Ltd. 29,561,795.38 Min. of Works
233 3/12/2017 Constr. Of 1no. Student hostel at GUSS M/madori (variation/fluctuation) FGPC/262/2016/VOL.I/12 Haruna Ladan Invest. 2,189,567.11 Min of Education
234 3/12/2017 Constr. Of 1no. Student hostel at GUSS M/madori (variation/fluctuation) FGPC/158/2016/VOL.I/12 Haruna Ladan Invest. 2,189,567.11 Min of Education
235 3/12/2017 Constr. Of 1no. Student hostel at GUSS M/madori (variation/fluctuation) FGPC/156/2016/VOL.I/12 Haruna Ladan Invest. 2,189,567.11 Min of Education
236 3/12/2017 Constr. Of 1no. Student hostel at GUSS M/madori (variation/fluctuation) FGPC/159/2016/VOL.I/12 Haruna Ladan Invest. 2,189,567.11 Min of Education
237 5/12/2017
Constr. Of Islamiyya classroom blocks as Constituency project at U/marayu, Fulanin
Kangire and Wurno in Birnin Kudu constituency. FGPC/148/2017/VOL.I/15 Nushe Resources 9,819,816.00 Min of Education 8 weeks
238 24/11/2017 Renov/rehab of Maigatari Export Processing Zone (EPZ) MOC/S/ADM/42/VOL.1/XXX Alpha Zeta Tech. Services 21,482,985.00 Min of Commerce 3 weeks
239 6/12/2017
Drilling and Installation of Water Borehole at Emir of Ringim's Official Residence in
Dutse JG/CRS/RA/ADM/13/III Sir Walter Drilling 850,000.00 Cabinet office 2 weeks
240 27/12/2017
Construction of Block of 3-Classrooms, Adminisrative Block, 2No. Of 6-seater pit
latrines and 1No. Hand Pump at Government Day Secondry School Jahun (lot-8) for
2017 1St and 2nd Quarter Capital projects (Phase II) across the State. FGPC/309/2017/VOL.I/8 Modang Invest Ltd 29,102,893.90 Min of Education 12 weeks
241 27/12/2017
Construction of Block of 3-Classrooms, Adminisrative Block, Laboratoty Block, 2No. Of 6-
seater pit latrines and 1No. Hand Pump at Government Day Secondry School Kanti
Kazaure (lot-12) for 2017 1St and 2nd Quarter Capital projects (Phase II) across the FGPC/311/2017/VOL.I/8 A A Maikatako Gen. 29,158,821.20 Min of Education 12 weeks
BALANCE C/F 7,436,646,072.07
S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD
(N)
BALANCE B/F 7,436,646,072.07
242 27/12/2017
Construction of Block of 3-Classrooms, Adminisrative Block, Laboratoty Block, 2No. Of 6-
seater pit latrines and 1No. Hand Pump at Government Day Secondry School Galamawa
(lot-11) for 2017 1St and 2nd Quarter Capital projects (Phase II) across the State. FGPC/313/2017/VOL.I/18 A A Maikatako Gen. 29,158,821.11 Min of Education 12 weeks
243 27/12/2017
Construction of Block of 3-Classrooms, Adminisrative Block, Laboratoty Block, 2No. Of 6-
seater pit latrines and 1No. Hand Pump at Government Day Secondry School Dutse (lot-
14) for 2017 1St and 2nd Quarter Capital projects (Phase II) across the State. FGPC/324/2017/VOL.I/8 Sassauci Multi Trade 29,137,148.24 Min of Education 12 weeks
244 27/12/2017
Construction of Block of 3-Classrooms, Adminisrative Block, Laboratoty Block, 2No. Of 6-
seater pit latrines and 1No. Hand Pump at Government Day Secondry School Kadira (lot-
15) for 2017 1St and 2nd Quarter Capital projects (Phase II) across the State. FGPC/325/2017/VOL.I/8 Sassauci Multi Trade 29,137,148.24 Min of Education 12 weeks
245 27/12/2017
Construction of Block of 3-Classrooms, Adminisrative Block, Laboratoty Block, 2No. Of 6-
seater pit latrines and 1No. Hand Pump at Government Day Secondry School Dakido
(lot-16) for 2017 1St and 2nd Quarter Capital projects (Phase II) across the State. FGPC/323/2017/VOL.I/8 Masaka Glo. Con. Ltd 29,140,358.61 Min of Education 12 weeks
246 27/12/2017
Construction of Block of 3-Classrooms, Adminisrative Block, Laboratoty Block, 2No. Of 6-
seater pit latrines and 1No. Hand Pump at Government Day Secondry School Dansure
(lot-13) for 2017 1St and 2nd Quarter Capital projects (Phase II) across the State. FGPC/326/2017/VOL.I/8 Sassauci Multi Trade 29,137,148.24 Min of Education 12 weeks
247 27/12/2017
Construction of Block of 3-Classrooms, Adminisrative Block, Laboratoty Block, 2No. Of 6-
seater pit latrines and 1No. Hand Pump at Government Day Secondry School Gada (lot-
19) for 2017 1St and 2nd Quarter Capital projects (Phase II) across the State. FGPC/305/2017/VOL.I/8 Sabon Gari 'Ya'ya Nig 37,964,046.26 Min of Education 12 weeks
248 27/12/2017
Construction of Block of 3-Classrooms, Adminisrative Block, Laboratoty Block, 2No. Of 6-
seater pit latrines and 1No. Hand Pump at Government Day Secondry School Ringim
(lot-21) for 2017 1St and 2nd Quarter Capital projects (Phase II) across the State. FGPC/307/2017/VOL.I/8 Sabon Gari 'Ya'ya Nig 37,964,046.26 Min of Education 12 weeks
249 27/12/2017
Construction of Block of 3-Classrooms, Adminisrative Block, Laboratoty Block,2No. Of 6-
seater pit latrines and 1No. Hand Pump at Government Day Secondry School Dundubus
(lot-18) for 2017 1St and 2nd Quarter Capital projects (Phase II) across the State. FGPC/306/2017/VOL.1/8 Imam Ahmad Nig. Ltd. 37,923,773.12 Min of Education 12 weeks
250 27/12/2017
Construction of Block of 3-Classrooms, Adminisrative Block, Laboratoty Block, 2No. Of 6-
seater pit latrines and 1No. Hand Pump at Government Day Secondry School Hadejia
(lot-20) for 2017 1St and 2nd Quarter Capital projects (Phase II) across the State. FGPC/308/2017/VOL.1/8 Imam Ahmad Nig. Ltd. 37,923,773.12 Min of Education 12 weeks
BALANCE C/F 7,734,132,335.27
S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD
(N)
BALANCE B/F 7,734,132,335.27
251 27/12/2017
Construction of Block of 3-Classrooms, Adminisrative Block, Laboratoty Block, 2No. Of 6-
seater pit latrines and 1No. Hand Pump at Government Day Secondry School Sabuwar
Gwaram (lot-10) for 2017 1St and 2nd Quarter Capital projects (Phase II) across the
State. FGPC/312/2017/VOL.1/8 A A Maikatako Gen. 29,158,821.11 Min of Education 12 weeks
252 21/12/2017 Construction of Wall Fence, Gate and House at Specialist Hospital Kazaure FGPC/298/2017/VOL.1/6 Ngaloma Constr Com 57,329,839.50 Min of Health 8 Weeks
253 18/12/2017
Rehabilitation of Solar Powered Water supply schemes across the State at Birnin kudu,
Dutse, Hadejia,Ringim, Gumel, Jahun and Kazaure zone (Stowa) FGPC/263/2017/VOL.1/7 Sims Global Resources 166,689,700.28 Min of Water 12 weeks
254 28/12/2017
Construction of complete Solar Powered Water supply scheme in Yan Maulu Town in
Babura Local Govt Area and conversion of Daba Town Water supply scheme in Kazaure
Local Govt Area. FGPC/332/2017/VOL.1/6 Umar Aliyu & Sons Ltd. 14,255,587.50 Min of Water Resources 8 Weeks
255 28/12/2017 Improvement of Taura Water supply scheme in Taura local Govt Area FGPC/333/2017/VOL.1/6 Ngaloma Constr Com 51,176,269.46 Min of Water Resources 12 weeks
256 18/12/2017
Construction of One (1No.) Students Hostel on Existing foundation at the Institute of
Information Technology, Kazaure. FGPC/264/2017/VOL.1/8 Nushe Biz. Resources 49,831,834.74 Min of Education 12 weeks
257 22/12/2017
Construction of Reinforced Concrete Block line Drains and Culvert at Aujara Bakin
Kasuwa and Tsigi (1650m). FGPC/302/2017/VOL.1/8 Alren Constr. Co. Ltd. 63,238,372.91 Min of Works 4 Weeks
258 22/12/2017 Rehabilitation and upgrading of Aujara access road (1.65KM). FGPC/301/2017/VOL.1/8 Retercha Co. Ltd. 96,860,399.34 Min of Works 6 weeks
259 6/12/2017 Drilling and installation of Water Borehole at Emir of Ringim Official residence in Dutse JG/CRS/RA/ADM/13/III Sir Walter Drilling & Gen 850,000.00 Cabinet Office 2 weeks
260 14/08/2017
Construction of Solar Powered Water Supply Schemes (PhaseI) as Constituency project
at Gargadin Giwa and Rumbiya in Burnin kudu Constituency. FGPC/126/2017/VOL.1/15 Y-Tech Invst. & Agro Nig Ltd 13,921,740.00 Min of Water 8 Weeks
261 18/12/2017
Construction of Five (5) daily Prayer Mosques at Wutsadaand Kankare Fulani in Gwaram
Constituency. FGPC/330/2017/VOL.1/7 Al-Nasibi Gen. Intp. 4,129,061.98 Cabinet Office 4 Weeks
262 18/12/2017
Construction of Five (5) daily Prayer Mosques at Namako (Sabon Gari Ward) inMiga
Constituency. FGPC/334/2017/VOL.1/7 Khairussabah Nig. Ltd 2,064,530.99 Cabinet Office 4 Weeks
263 18/12/2017
Construction of Five (5) daily Prayer Mosques at Garin Baki, Dan Farantama, Zuge and
Tudun D/Bulim in Gumel Constituency. FGPC/321/2017/VOL.1/7 Jag & H Intgrt. Serv. Ltd. 8,258,123.96 Cabinet Office 8 Weeks
BALANCE C/F 8,291,896,617.04
S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD
(N)
BALANCE B/F 8,291,896,617.04
264 18/12/2017
Construction of Five (5) daily Prayer Mosques at Dingari Walgare and Batukokori (Batu
Ward) in Birniwa Constituency. FGPC/285/2017/VOL.1/7 Amm Manzo Nig. Ltd. 4,129,061.98 Cabinet Office 6 Weeks
265 18/12/2017
Construction of Five (5) daily Prayer Mosques at Karshi and Aimas Kuka in Auyo
Constituency. FGPC/286/2017/VOL.1/7 Amm Manzo Nig. Ltd. 4,129,061.98 Cabinet Office 6 Weeks
266 18/12/2017
Construction of Five (5) daily Prayer Mosques at Kukuma Kudu (Kumuma Ward), Dakori
(Gantsa Ward) and Falgeri Arewa (Falgeri Ward) in Buji Constituency. FGPC/277/2017/VOL.1/7 K-Manu Gen. Cnstrc. & Engr 6,193,592.97 Cabinet Office 8 Weeks
267 18/12/2017
Construction of Five (5) daily Prayer Mosques at S/G Shinakani, Galadimawa and
Bulangori in Buji Constituency. FGPC/279/2017/VOL.1/7 A+Tech Intgrt. Service 6,193,592.97 Cabinet Office 6 Weeks
268 18/12/2017
Construction of Five (5) daily Prayer Mosques at Kiramisau, Tage (Fandu Ward) and
Maikintari (Kirikasamma Ward) in Kirikasamma Constituency. FGPC/282/2017/VOL.1/7 Alh Umar Baban Doki Nig Ltd 6,193,592.97 Cabinet Office 6 Weeks
269 18/12/2017
Construction of Five (5) daily Prayer Mosques at Garbagar Gari (Garbagai Ward), Wareri
(Guri Ward), Zoriyo (Adiyani Ward), Jauron Kadira (Kadira Ward) and Dolewa (Kadira
Ward) in Guri Constituency. FGPC/281/2017/VOL.1/7 Alh Umar Baban Doki Nig Ltd 10,322,654.95 Cabinet Office 8 Weeks
270 18/12/2017
Construction of Five (5) daily Prayer Mosques at Asayaya Gari (Sule Ward), Garin Tamba
(Taka Tsaba Ward) Muku Gari and renovation of 1No. Mosque at Sule Kudu Primary
School (Sule Ward) in Sule Tankarkar Constituency. FGPC/280/2017/VOL.1/7 Khairubaba Nig. Ltd. 8,258,123.96 Cabinet Office 8 Weeks
271 18/12/2017
Construction of Five (5) daily Prayer Mosques at Gidan Nagari, Damaganawa Yamma,
Kadirawa Aduchawa, Zage dantse, Kaka lafiya, Zareku, Koya, Burji Abuja, Gwari and
Zugawa in Miga Constituency. FGPC/271/2017/VOL.1/7 Amia Intgr Serv. Nig. Ltd. 20,645,309.99 Cabinet Office 12 Weeks
272 18/12/2017
Construction of Five (5) daily Prayer Mosques at Makwarawa(Tofa Ward) and Dabi (Dabi
ward) in Ringim Constituency. FGPC/265/2017/VOL.1/7 Prestige Intgrt. Serv. 4,129,061.98 Cabinet Office 6 Weeks
273 18/12/2017
Construction of Five (5) daily Prayer Mosques at mazazzaga (Garko Ward) and Balago
Town Balago Ward) in Kiyawa Constituency. FGPC/284/2017/VOL.1/7 Demastbo Ventures Ltd. 4,129,061.98 Cabinet Office 6 Weeks
274 18/12/2017
Construction of Five (5) daily Prayer Mosques at Kandila Wuriya (Machinamari Ward),
Balamalum (Machinamari Ward) and matamu (Matamu Ward) in Birniwa Constituency. FGPC/328/2017/VOL.1/7 Masaka Global Concept Ltd 6,193,592.97 Cabinet Office 6 Weeks
275 18/12/2017
Construction of Five (5) daily Prayer Mosques at Jemawa, Sansami, Muna fadi and
Construction of Juma'at Prayer Mosque at Kanya Town in Kanya Babba Constituency of
Babura Local Govt Area. FGPC/304/2017/VOL.1/7 Deetech Nig. Ltd. 16,304,386.14 Cabinet Office 12 Weeks
BALANCE C/F 8,388,717,711.88
S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD
(N)
BALANCE B/F 8,388,717,711.88
276 18/12/2017
Construction of Five (5) daily Prayer Mosques at Mirgina, Danbuwayi, Zuge,
UnguwarKiwo, Dan Goriba and Construction of Juma'at Prayer Mosque at Danbanki in
Sule Tankarkar Constituency. FGPC/300/2017/VOL.1/7 Bulangu Drilling Services 22,536,624.84 Cabinet Office 12 Weeks
277 18/12/2017
Construction of Five (5) daily Prayer Mosques at Kajimaran (Dawa Ward), Garin Malam
(Abunabo Ward), Zango Tsangaya (Matara Babba Ward), Guri Nayinawa (Guri Ward) and
Guri Town Yallari (Guri Ward) in Guri Constituency. FGPC/299/2017/VOL.1/7 Jiffa Enterprises 10,322,654.95 Cabinet Office 8 Weeks
278 18/12/2017
Construction of Five (5) daily Prayer Mosques at J/Habuja, Gorum Wangara, Barde rabe
(Madobi Ward), Maya-maya (Kudai Ward), Katangar Lafiya (Madobi Ward) and Sharifai
(Madobi Ward) in Dutse Constituency. FGPC/275/2017/VOL.1/7 Al-Kasam Jannah Nig. Ltd. 14,451,716.93 Cabinet Office 8 Weeks
279 18/12/2017
Construction of Five (5) daily Prayer Mosques at Kabala, Sabuawr Gada, Gabori and
Majira in jahun Constituency. FGPC/269/2017/VOL.1/7 Yanduna Ventures Ltd. 8,258,123.96 Cabinet Office 8 Weeks
280 18/12/2017
Construction of Five (5) daily Prayer Mosques at Shaiskawa, Gabas, Badado, Mai tsani,
Gezoji, Durgutawa, Dunguliya and Gurunfa in Kazure Constituency. FGPC/268/2017/VOL.1/7 Yanduna Ventures Ltd. 14,451,716.93 Cabinet Office 12 Weeks
281 18/12/2017
Construction of Five (5) daily Prayer Mosques at Kandi (Bata Ward), Unguwar Magaji
(BataWard) and completion/renovation of Juma'at Prayer Mosques at Babura Central
Mosque, Jigawar Dan Ali central and Babura Jibwis in Babura Constituency. FGPC/288/2017/VOL.1/7 Mufabamex Concept Ltd. 21,631,959.79 Cabinet Office 12 Weeks
282 18/12/2017
Construction of Five (5) daily Prayer Mosques at Dazara Waje, Lewa, Sara kudu,
Unguwar Gwanji, Gwanjira and Yadda in Gwaram Constituency. FGPC/273/2017/VOL.1/7 Nushe Business Resources 12,387,185.94 Cabinet Office 8 Weeks
283 18/12/2017
Construction of Five (5) daily Prayer Mosques at Sabuawar Kaura, Kiyako, Birnin kudu,
Samamiya and Bigidan in Birnin Kudu Constituency. FGPC/272/2017/VOL.1/7 Nushe Business Resources 10,322,654.95 Cabinet Office 8 Weeks
284 18/12/2017
Construction of Three (3) daily Prayer Mosques at Yakasai, Unik Babba and Kalgwai in
auyo Constituency. FGPC/274/2017/VOL.1/7 Xtra 99 Intgrt Services Ltd. 6,193,592.97 Cabinet Office 6 weeks
285 18/12/2017 Construction of Juma'at Prayer Mosques at Garin Mado in Gagarawa Constituency. FGPC/297/2017/VOL.1/7 Modang Investment Ltd. 9,527,340.25 Cabinet Office 12 Weeks
286 18/12/2017 Construction of Juma'at Prayer Mosques at Gidan Dallaand Kaban in Auyo Constituency. FGPC/319/2017/VOL.1/7 A.A Aljazeera Agro Processing 19,880,299.20 Cabinet Office 12 Weeks
287 18/12/2017 Construction of Juma'at Prayer Mosques at Tattari in Maigatari Constituency. FGPC/267/2017/VOL.1/7 Marb Engr. & Multi Services 8,152,066.79 Cabinet Office 12 Weeks
288 18/12/2017 Construction of Juma'at Prayer Mosques at Turbus in Maigatari Constituency. FGPC/278/2017/VOL.1/7 Alkawakeb Global Concept 13,748,890.28 Cabinet Office 12 Weeks
289 18/12/2017
Construction of Juma'at Prayer Mosques at Tsadawa, Abakura and Tsinaho in Taura
Constituency. FGPC/276/2017/VOL.1/7 Dan Kwara Maijimina NigLtd 10,258,059.52 Cabinet Office 12 Weeks
BALANCE C/F 8,570,840,599.18
S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD
(N)
BALANCE B/F 8,570,840,599.18
290 18/12/2017
Construction of Juma'at Prayer Mosques at Dagaceri (Batu Ward) in Birniwa
Constituency. FGPC/290/2017/VOL.1/7 Amm Manzo Nig. Ltd. 14,403,675.29 Cabinet Office 12 Weeks
291 18/12/2017 Construction of Juma'at Prayer Mosques at Tattari Maigatari Constituency. FGPC/320/2017/VOL.1/7 A.A. Maikatako Gen. Entp 8,152,066.79 Cabinet Office 12 Weeks
292 18/12/2017
Construction of Juma'at Prayer Mosques at Karkarna and completion/renovation of
Juma'at prayer Mosque at Yankwashi Central Mosque in Yankwashi Constituency. FGPC/294/2017/VOL.1/7 Granatoids Engr. Services 29,994,641.37 Cabinet Office 12 Weeks
293 18/12/2017
Completion/renovation of Juma'at Prayer Mosques at Jibwis Garki in Garki
Constituency. FGPC/322/2017/VOL.1/7 Jag & H Intgrt Services Ltd 23,736,083.26 Cabinet Office 12 Weeks
294 18/12/2017
Completion/renovation of Juma'at Prayer Mosques at Shabaru in Suletankarkar
Constituency. FGPC/327/2017/VOL.1/7 A.A. Maikatako Gen. Entp 3,091,180.72 Cabinet Office 12 Weeks
295 18/12/2017
Completion/renovation of Juma'at Prayer Mosques at Gabarin, Tsungur, Shafar
Daurawa, Sankara, Karshi and K/Babushe in Ringim Constituency. FGPC/266/2017/VOL.1/7 Marb Engr. & Multi Services 25,604,269.74 Cabinet Office 12 Weeks
296 18/12/2017
Completion/renovation of Juma'at Prayer Mosques at Yarkurshe, Dan Barge, Ganga,
Kwanar Garki, GGSS Garki, Kaya, Kargo, Kafadodo and Batakashi in Garki Constituency. FGPC/291/2017/VOL.1/7 MMZ Garki Consrt Ltd 18,344,212.97 Cabinet Office 12 Weeks
297 18/12/2017
Completion/renovation of Juma'at Prayer Mosques at Izala Basirka, Kawari, Matsango
and Construction of Juma'at Prayer Mosques at Basirka Central and Wall Fencing at
Digijin Juma'at Mosque in Fagam Constituency in Gwaram L. G. A. FGPC/289/2017/VOL.1/7 G. M. Sara & Sons Ltd 44,858,345.27 Cabinet Office 14 Weeks
298 18/12/2017
Completion/renovation of Juma'at Prayer Mosques at Dansure and Roni kudu and
Construction of Juma'at Prayer Mosques at Kaya and Wall Fencing at Takwardawa in
Roni Constituency. FGPC/270/2017/VOL.1/7 Na'ayi Recources Ltd. 33,832,397.35 Cabinet Office 12 Weeks
299 18/12/2017
Construcction of Wall fencing of Juma'at Prayer Mosque at Gidar Sarki in Kafin Hausa
Constituency. FGPC/287/2017/VOL.1/7 AMM Manzo Nig. Ltd. 2,048,758.99 Cabinet Office 6 Weeks
300 18/12/2017
Renov of five (5) Daily prayer mosque at Arki town (Arki ward) in M/madori
Constituency FGPC/335/2017/VOL.1/7 Ramadan Constr Co. 2,064,530.99 Cabinet Office 6 Weeks
301 28/12/2017 Improvement of Jahun town water supply scheme in Jahun LGA FGPC/338/2017/VOL.1/6 Babandoki Gen Entp. 19,822,950.00 Min of Water Resources 12 Weeks
302 28/12/2017 Improvement of Kiyawa town water supply scheme in Kiyawa LGA FGPC/337/2017/VOL.1/6 Babandoki Gen Entp. 38,571,055.11 Min of Water Resources 12 Weeks
303 18/12/2017
Completion/renovation of Juma'at Prayer Mosques at Sarawa, Fadawa and Adin in
Kafin Hausa Constituency in Gwaram L. G. A. FGPC/283/2017/VOL.1/7 Demastbo Ventures Ltd. 9,338,782.31 Cabinet Office 12 Weeks
304 27/12/2017
Construction of Block of 3-Classrooms, Adminisrative Block, Laboratoty Block, 2No. Of 6-
seater pit latrines and 1No. Hand Pump at Government Day Secondry School Ringim
(lot-9) for 2017 1St and 2nd Quarter Capital projects (Phase II) across the State. FGPC/317/2017/VOL.1/8 Alhansad Invest. Ltd. 29,086,685.06 Min of Education 12 weeks
BALANCE C/F 8,873,790,234.40
S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD
(N)
BALANCE B/F 8,873,790,234.40
305 27/12/2017
Construction of Block of 3-Classrooms, Adminisrative Block, Laboratoty Block, 2No. Of 6-
seater pit latrines and 1No. Hand Pump at Government Day Secondry School Gada (lot- FGPC/318/2017/VOL.1/8 Alhansad Invest. Ltd. 38,092,674.78 Min of Education 12 weeks
306 20/11/2017 Constr of Drainages at Achauya village, S/Tankarkar Constituency. ME/ADM/S/115/1/8 Sukudai Constr. Nig. Ltd. 12,017,528.27 Min of Environment 12 weeks
307 18/12/2017
Construction of Five (5) Daily Prayer Mosques at Gilima, Gidan Naruwa, Kundu-Gidan
Liman, Kukuy (Chukuto ward), Zangon Maje, Kaya-Gazara (Chukuto ward) and Dogon
Marke (Kwalam ward) in Taura Constituency. FGPC/336/2017/VOL.1/8 A.Y. Dan baba Nig. Ltd. 14,451,716.93 Cabinet Office 8 Weeks
308 18/12/2017
Construction of Five (5) Daily Prayer Mosques at Kofar Fada Mafudi in fagam
Constituency. FGPC/339/2017/VOL.1/7 G.M. Sara & Sons Ltd. 2,064,530.99 Cabinet Office 4 Weeks
309 16/10/2017
Construction of Five (5) Daily Prayer Mosques at Tsigi, Yar Kasuwa and Gidan Ganji in
Jahun Constituency. FGPC/227/2017/VOL.1/6 A.A. Aljazeera Agro 6,686,394.75 Cabinet Office 12 Weeks
310 18/12/2017
Construction of Five (5) Daily Prayer Mosques at Garbagal Gari (Garbagal ward), Wareri
(Guri Ward), Zoriyo (Adiyani ward), Jauron Kadira (Kadira ward) and Dolewa (Kadira
ward) in Guri Constituency. FGPC/281/2017/VOL.1/7 Alh. Umaru Baban Doki 10,322,654.95 Cabinet Office 8 Weeks
311 18/12/2017 Construction of Five (5) Daily Prayer Mosques atGuntai Gari in Gwiwa Constituency. FGPC/340/2017/VOL.1/7 Daragi and Sons 2,064,530.99 Cabinet Office 4 Weeks
GOODS
312 3/3/2017 Purchase of Grains (Maize) (1000 mts) CONC/4/2017 Juraj Gen. Entp. 145,480,000.00 Min. of Women Affairs 4 weeks
313 6/3/2017
Supply and Installation of Stand-Alone Solar Streetlight Poles with Accessories (100 units) at
Kanya Babba in Babura LGA. (change of scope) FGPC/146/2016/VOL.1/9 SIMS Global Resoures 63,283,500.00 Min. of Works 12 weeks
314 6/3/2017
Supply and Installation of Stand-Alone Solar Streetlight Poles with Accessories (100 units) along
Old Police H/qtrs. To Garu road at Dutse LGA. (change of scope) FGPC/145/2016/VOL.1/9 SIMS Global Resoures 63,283,500.00 Min. of Works 12 weeks
315 4/1/2017 Procurement and Fixing of Furniture to Deputy Governor's Residential complex, Dutse FGPC/202/2016/VOL.1/6 Connaught Internation Serv. 74,442,690.00 DCDA 4 weeks
316 7/2/2017 Supply of Furniture to New School of Nursing, Hadejia FGPC/16/2016/VOL.1/12 Wajabs Building & Constr. 47,076,618.00 Min. of Health 12 weeks
317 19/4/2017
Procurement and Apply of Termites and Bats Control Chemicals for 87no. Schools
across the State FGPC/60/2017/VOL.1/8 Ngloma Constr. Co. 12,789,000.00 Min. of Education 8 weeks
BALANCE C/F 9,365,845,574.06
S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD
(N)
BALANCE B/F 9,365,845,574.06
318 31/5/2017 Approval for the purchase of Grains (Maize) (650 MTS) CONC/14/2017 Juraj Gen. Entp. 99,162,000.00 Min. of Women Affairs 4 weeks
319 21/6/2017
Supply and Installation of Furniture and Electronics for the New Guest's Facilities at
MDI Dutse FGPC/95/2017/VOL.1/5 BABAN DOKI GEN. ENTP. 246,220,380.00 HOS Office 12 weeks
320 20/04/2017 Purchase of 2,000 Sets of Classroom Furniture FGPC/61/2017/VOL.I/7 FURNI-ELECT GLOBAL 30,000,000.00 Min of Education 12 weeks
321 20/04/2017 Purchase of 4,000 Sets of Classroom Furniture FGPC/62/2017/VOL.I/7 ABDUL-COM PROJECT 60,000,000.00 Min of Education 12 weeks
322 18/08/2017
Supply of 660 Set of 3Seater Class Room Furniture at GDSS Roni, Supply of 110 3Seater Class
Rooms Furniture at GDSS Gada, Supply of 385 Sets of 3 Seater ClassRooms Furniture at GGDSS
Kazaure and Supply of 330 Sets of 3Seater ClassRoom Furinture at GDSS Kazaure. FGPC/169/2017/VOL.I/16 NAKOWA GEN ENT 29,894,720.05 Min of Education 8 Weeks
323 11/7/2017 Furnishing and Equipping of his Excellency, the Deputy Governor's Lodge, Abuja. FGPC/101/2017/VOL.I/5 CONNAUGHT INT LTD 31,042,200.00 SSG Office 12 weeks
324 19/07/2017
Supply and Installation of Stand Alone Solar Streetlight Poles with Accessories ( 100 Units) Along
Old Police Headquarters Garu Road at Dutse( Additional Works (32 Units). FGPC/145/2016/VOL.I/28 SIMS GLOBAL RESO 19,196,100.00 Miin of Works
325 22/08/2017
Purchase of Classroom Furniture (GGUSS Kazaure, GUSS Maigatari, GDSS Babura, GGUSS M/Madori, GDSS
Garun Gabas, GDSS Bulangu, GUSS Basirka and GGUSS Gwaram). FGPC/174/2017/VOL.I/20 MUTUAL INFRASTRU 64,471,284.66 Min of Education 12 weeks
326 24/08/2017
Supply of 958 Sets of 3 Seater ClassRooms Furniture and Supply of 1056 3 Seaters Class Rooms Furniture at
GSS Fantai and Gss Famfo Goma, Hadejia. FGPC/165/2017/VOL.I/20 FURNI ELECT GLOBAL VEN 39,977,900.00 Min of Education 8 weeks
327 17/08/2017
Procurement and Installation of Ict Equipment at 8No. Centre of excellence (GGUSS Kazaure, GUSS Maigatari,
GDSS Babura, GGUSS M/Madori, GDSS Garun Gabas, GDSS Bulangu, GUSS Basirka and GGUSS Gwaram). FGPC/167/2017/VOL.I/15 NGALOMA CONST LTD 148,885,944.48 Min of Education 8 weeks
328 22/08/2017 Supply of 30,000 Sets of Schools Uniforms to all SS-1 Girls of Senior Secondary Schools Across the State FGPC/177/2017/VOL.I/20 313 TEXTILE NIG LTD 74,655,000.00 Min of Education 8 weeks
329 18/08/2017
Procurement of Assorted Biology Laboratory Equipment at 8No. Centre of Execellence(GGUSS Kazaure, GUSS
Maigatari, GDSS Babura, GGUSS M/Madori, GDSS Garun Gabas, GDSS Bulangu, GUSS Basirka and GGUSS
Gwaram) FGPC/170/2017/VOL.I/15 A.A MAIKATAKO GEN ENT 34,903,627.50 Min of Education 16 weeks
330 18/08/2017
Procurement of Assorted Chemistry Laboratory Equipment at 8No. Centres of Execellence (GGUSS Kazaure,
GUSS Maigatari, GDSS Babura, GGUSS M/Madori, GDSS Garun Gabas, GDSS Bulangu, GUSS Basirka and
GGUSS Gwaram) FGPC/171/2017/VOL.I/17 A.A MAIKATAKO GEN ENT 34,197,019.50 Min of Education 8 Weeks
331 21/08/2017
Procurement of Assoorted Physics Laboratory Equipments at 8No. Centres of Excellence (GGUSS Kazaure,
GUSS Maigatari, GDSS Babura, GGUSS M/Madori, GDSS Garun Gabas, GDSS Bulangu, GUSS Basirka and
GGUSS Gwaram) FGPC/173/2017/VOL.I/20 MUGIN INVT LTD 37,043,435.93 Min of Education 8 Weeks
332 24/08/2017
Supply of 539 Sets of 3-seater classroooms furniture at GDSS Gumel, Supply of 724 3-Seater Classrooms
Furniture at GSS Maigatari, Supply of 539 Sets of 3-seater Classrooms furniture at GGDSS Gumel and Supply of
261 Sets of 3-Seater Classroom Furniture at GDSS Maigatari FGPC/166/2017/VOL.I/8 ABDULCOM PROJECT 40,950,550.00 Min of Education 8 Weeks
333 9/8/2017 Purchase of Fairly Used Armoured Lexus Jeep LX570 2013 Model. FGPC/129/2017/VOL.I/6 ZAAN MULTI TRADE 38,500,000.00 Govt. House 2 weeks
334 19/10/2017
Supply and Installation of 40 unit of 90 watts and 50 unit of 36 watts stand alone solar
powered streetlights in the premises of commissioner's qtrs., Dutse FGPC/244/2017/VOL.I/8 SIMS Global Resources 31,773,000.00 Min. of Works 4 weeks
335 19/10/2017
Supply and Installation of 40 unit of 90 watts and 50 unit of 36 watts stand alone solar
powered streetlights in and around five Building blocks at State Secretariat, Dutse FGPC/245/2017/VOL.I/8 SIMS Global Resources 33,361,650.00 Min. of Works 4 weeks
BALANCE C/F 10,460,080,386.18
S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD
(N)
BALANCE B/F 10,460,080,386.18
336 27/12/2017
Supply and disribution of 3-Seater Desks (Lot-1) at Senior Secondry Schools for 2017 1St
and 2nd Quarter Capital projects (Phase II) across the State. FGPC/310/2017/VOL.I/8 Modang Invest Ltd 13,919,062.50 Min of Education 6 weeks
337 27/12/2017
Supply and disribution of 3-Seater Desks (Lot-2) at Senior Secondry Schools for 2017 1St
and 2nd Quarter Capital projects (Phase II) across the State. FGPC/316/2017/VOL.I/8 Babandoki Gen. Ent. Ltd. 10,745,876.25 Min of Education 6 weeks
338 27/12/2017
Supply and disribution of 3-Seater Desks (Lot-4) at Senior Secondry Schools for 2017 1St
and 2nd Quarter Capital projects (Phase II) across the State. FGPC/329/2017/VOL.I/8 Wajab Building 11,244,675.96 Min of Education 6 weeks
339 27/12/2017
Supply and disribution of 3-Seater Desks (Lot-6 & 3) at Senior Secondry Schools for 2017
1St and 2nd Quarter Capital projects (Phase II) across the State. FGPC/315/2017/VOL.I/8 Abdulcom Proj. & Service 60,124,242.25 Min of Education 12 weeks
340 27/12/2017
Supply and disribution of 3-Seater Desks (Lot-7 & 5) at Senior Secondry Schools for 2017
1St and 2nd Quarter Capital projects (Phase II) across the State. FGPC/314/2017/VOL.I/8 Furni Elect Global 12,661,754.35 Min of Education 12 weeks
341 20/12/2017
Supply of 1.750No. 3-Seater Students Desks and benches to selected Arabic Senior
Secondry Schools FGPC/296/2017/VOL.I/7 Abdulcom Proj. & Service 34,912,500.00 Min of Education 12 weeks
342 20/12/2017
Supply of 1.242Nos. 3-Seater Students Desks and benches to some newly established
Senior Secondry Schools FGPC/295/2017/VOL.I/7 Furni-Elect Global 24,777,900.00 Min of Education 12 weeks
343 20/12/2017 Supply and installation of Solar Powered lightening System in Babura General Hospital. FGPC/292/2017/VOL.I/6 Sims Global Resources 20,984,971.88 Min of Health 8 Weeks
344 20/12/2017 Supply and installation of Solar Powered lightening System in GumelGeneral Hospital. FGPC/293/2017/VOL.I/6 Sims Global Resources 30,263,168.13 Min of Health 8 weeks
345 22/12/2017 procurement of E-Books Software for Senior Secondry Schools across the State FGPC/303/2017/VOL.1/6 Learn Africa Nig. Ltd 10,000,000.00 Min of Education 8 weeks
346 14/12/2017
Supply and installation s of 150 Units Integrated stadalone Solar Powered Streetght at
Aujara in Jahun Local Govt Area FGPC/262/2017/VOL.1/8 Sims Nig. Ltd. 95,192,680.94 Min of Works 12 weeks
SERVICES
347 11/4/2017
Supervision of the construction of Asphalt concrete Overlay of Tasheguwa-Guri Road
(42.14KM) FGPC/31/2013/VOL.I/38 EMACS ENG. CONSULTANT 41,228,554.70 Min of Works 12 months
348 18/05/2017
Supervision of the construction of Maigatari-Galadi-Girbobo-Diginsa-Birniwa Road
(Phase II) (37.1KM) FGPC/136/2012/VOL.I/171 HIMMA TECH SERV. 74,761,966.60 Min of Works 13 months
349 18/05/2017
Supervision of the construction of of Maigatari-Galadi-Girbobo-Diginsa-Birniwa Road
(Phase III) (44.7KM) FGPC/136/2012/VOL.I/173 HIMMA TECH SERV. 101,449,900.04 Min of Works 13 months
350 18/05/2017
Supervision of the construction of Arawa-Baturiya-Abunabo-Kadira-Guri Road (Phase
III) (33.7KM) FGPC/6/2012/VOL.I/95 LANDBASE ENG. SERV. 55,628,562.11 Min of Works 12 months
351 18/05/2017
Supervision of the construction of Andaza-Tsirma-Damutawa-Gadewa-Ajaura Road
(Phase II) (14.230KM) FGPC/51/2013/VOL.I/43 HARAD NIG LTD 29,194,382.97 Min of Works 12 months
BALANCE C/F 11,087,170,584.86
S/N DATE PROJECT CONTRACT NO. CONTRACTOR AMOUNT EXECUTING MINISTRIES COMP. PERIOD
(N)
BALANCE B/F 11,087,170,584.86
352 11/4/2017 Supervision of the Rehabilitation of Kwanar Dundu-Bulangu Road (44KM) FGPC/59/2017/VOL.I/14 CURVES AND STR 58,048,209.43 Min of Works 14 months
353 11/4/2017
Supervision of the construction of JigawarDan-ali-Maitsamiya-Suletankarkar-
Dangwanki-Dankumbo to Matsatsagi (45KM) and construction of Kudai-Ruru-
Dantawuya-Sakwaya Feeder Road (15KM) FGPC/138/2012/VOL.I/199 UKM Civil Eng. 14,172,571.35 Min of Works 12 months
354 11/4/2017
Supervision of the construction of Gagarawa-Maisheda-Damaski Maikirabo-Madaka-
Mallam baki-Kangarwa-Bosuwa Road (SPUR from Madaka to Maikilili) (29.01KM) FGPC/139/2012/VOL.I/78 WURO ASSC ENGR & PRJ 59,790,551.40 Min of Works 14 months
355 11/4/2017
Supervision of the construction of Kila-Budinga-Rambazau-Tsangarwa-Nahuce-Isawa-
Jikas-Zandam Nagogo Road (48KM) FGPC/79/2013/VOL.I/44WOODHILL ENGR CONSULTANTS 82,710,290.75 Min of Works 14 months
356 11/4/2017
Supervision of the construction of Shuwarin-Wurma-Abaya-Chamo-Isari Feeder Road
(28.9KM) Garki-Fagen gawo-Kore Feeder Road (30.8KM) and construction of Manga-
Takwasa road (4.5KM) FGPC/22/2011/VOL.I/89 HAG ENG. CONSULTANTS 14,939,342.59 Min of Works 12 months
357 19/06/2017
Commissioning as Consultant on the Supervision of the Construction of Jahun
Township Roads (Phase II). FGPC/136/2012/VOL.I/191 HIMMA TECH LTD 16,450,774.46 Min of Works 8 months
358 19/07/2017
Commissioning as consultanat for the supervision of the Constr of Dolen Kwana-Batu-
Kuka Inkiwa- Kupsa Feeder Road (32.6Km) and Construction of Majingini- Maimazari-
dantuwo- Hannun Giwa- DanKumbo Feeder Road (11.5Km). FGPC/31/2013/VOL.I/56 EMACS ENG CONSULT 13,440,505.46 Min of Works 8 months
359 19/10/2017
Engagment as Consultant for the supervision of the Constr. Of New Specialist Hospital,
Hadejia FGPC/22/2011/VOL.I/104 HAG Eng. Nig. Ltd. Min of Health 16 months
TOTAL 11,346,722,830.30
SECTION ( E )
COMPLETED PROJECTS
JANUARY TO DECEMBER, 2017
Min of Heath
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
1
Constr. of Wall Fencing, Gate and House at the
Proposed Specialist Hospital, Hadejia Al-Bait Associates Hadejia 47,861,278.25 47,861,278.25 47,788,204.01 3/22/2016 4 months 100 Completed
2
Renovation/Improvement works at Ringim General
Hospital Mashasha Invest. Ltd. Ringim 87,762,051.25 87,762,051.25 84,511,017.81 9/9/2016 20 weeks 100 Completed
3
Completion of 2no. Lassa wards at Ebola centre,
Dutse Rasheed Shekoni Specialist Hospital SUB General Ventures Dutse 8,415,746.33 8,415,746.33 8,313,598.29 8/10/2016 8 weeks 100 Completed
4
Renov ation/Improv ement and Water Scheme at Kafin
Hausa General Hospital. MOJAZ CONSTR. LTD K/Hausa 88,167,500.26 107,626,046.60 101,989,132.40 12/5/2016 16 w eeks 100 Completed
5
Construction of Gate And Gate House, Wall Fencing of
Student's Hostel And Landscaping At New School of NGALOMA CONSTR. LTD Hadejia 51,906,083.98 51,906,083.98 51,799,733.24 12/5/2016 16 w eeks 100 Completed
6
General Renov ation /Improv ement of Maigatari Primary
Health Care (PHC). S.U.B. GENERAL VENT. LTD Maigatari 49,170,156.46 49,170,156.46 46,590,625.25 12/5/2016 16 w eeks 100 Completed
7
Constr. Of Prototype basic Health Clinic (BHC)
Across the State as Constituency Project at Arbus
in Kaugama Local Government Area. (change of
site) S.U.B GEN VENTURE Kaugama 19,523,847.08 19,523,847.08 17,699,981.00 21/08/2018 16 Weeks 100 Completed
8
Construction of prototype basic health clinic (BHC)
across the state as constituency project at
Zandam ta Gabas in Gwaram consitituency. S.U.B. GEN VENTURES Gwaram 19,522,270.50 19,522,270.50 18,463,437.21 30/5/2017 16 weeks 100 Completed
9
Constr. Of Prototype basic Health Clinic (BHC)
Across the State as Constituency Project at Rabadi
in Fagam, Gwaram Local Government Area.
(change of site) A.A MAIKATAKO GEN ENT Gwaram 19,723,317.80 19,723,317.80 18,547,651.50 21/08/2018 16 Weeks 100 Completed
10
Construction of prototype basic health clinic (BHC)
across the state as constituency project at Falgeri
in Buji consitituency. S.U.B. GEN VENTURES Buji 19,435,197.06 19,435,197.06 18,463,437.21 30/5/2017 16 weeks 100 Completed
11
Construction of prototype basic health clinic (BHC)
across the state as constituency project at
Tuminjira in Balangu constituency, Kafin Hausa
Local Government Area A.A. MAIKATAKO GEN ENT K/Hausa 19,723,317.80 19,723,317.80 18,782,851.50 30/5/2017 16 weeks 100 Completed
12
Construction of prototype basic health clinic (BHC)
across the state as constituency project at Fagi in
Birniwa consitituency. S.U.B. GEN VENTURES Birniwa 19,791,955.70 19,791,955.70 18,800,049.45 30/5/2017 16 weeks 100 Completed
13
Constr. Of Prototype basic Health Clinic (BHC)
Across the State as Constituency Project at
Madobi in Dutse Local Government Area. (change
of site) IMAM AHMAD NIG Dutse 19,595,410.37 19,595,410.37 18,527,705.00 18/08/2018 16 weeks 100 Completed
14
Constr. Of Prototype basic Health Clinic (BHC)
Across the State as Constituency Project at Rabadi
in Fagam, Gwaram Local Government Area. A.A MAIKATAKO GEN ENT Gwaram 19,723,317.80 19,723,317.80 18,547,651.50 21/08/2018 16 Weeks 100 Completed
15
General Renov./Improvement works at Kazaure
Primary Health Centre (PHC) Babandoki Gen. Entp. Kazaure 48,714,143.31 48,714,143.31 46,390,288.92 2/11/2017 16 weeks 100 Completed
16 Renov works at PHC Basirka in Gwaram Muhal Global Concept Gwaram 14,766,348.45 14,766,348.45 14,632,797.02 30/10/2017 8 Weeks 100 Completed
Total 539,035,593.95 573,260,488.74 Completed
Min. of Water Resources
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
1
Conversion of Motorised Diesel powered water
schemes to Solar energy powered schemes
across the state at Sankara, Jigawa, Duzau and
Kiri Stations in Ringim zone (STOWA) MARB Eng. & Multy Serv . Ringim 22,958,250.00 22,958,250.00 22,900,854.38 4/29/2016 12 w eeks 100 Completed
2
Conversion of Motorised Diesel powered water
schemes to Solar energy powered schemes
across the state at Balago station in Dutse zone
(STOWA) Essence Worldw ide Serv . Dutse 5,739,562.50 5,739,562.50 5,725,213.60 4/29/2016 12 w eeks 100 Completed
3
Constr. o f Solar Powered Water Supply Schemes as
Constituency Pro ject at Doko in Garki Constituency Barwa Eng. Co. Ltd. Garki 6,155,625.00 6,155,625.00 6,140,241.19 7/2/2017 8 weeks 100 Completed
4
Constr. o f Hand pumps Water Supply Schemes (phase
II) as Constituency pro jects at Ung. Gabas, Rugar M aina
Duka, Rugar Adamu Chilaro, Rugar Lamido Gardi and
Rugar Hardo Ghamma in Birniwa Constituency. Hambiscon Nig. Ltd. Birniwa 2,762,025.00 2,762,025.00 2,755,119.94 29/3/2017 8 weeks 100 Completed
5
Conv.of Motorised Diesel powered water schemes
to Solar powered schemes across the state at
Ringim, Babura and Taura Stations in Ringim zone
(Water Board) Mutual Infrastructure Ringim 17,912,868.76 17,912,868.76 17,059,875.00 5/18/2016 12 w eeks 100 Completed
6
Conv.of Motorised Diesel powered water schemes
to Solar powered schemes across the state at
Dutse market and Mechanic village pump stations
in Dutse zone (Water Board) EAUXWELL Nig. Ltd. Dutse 7,871,850.00 7,871,850.00 7,497,000.00 5/18/2016 12 w eeks 100 Completed
7
Conv.of Motorised Diesel powered water schemes
to Solar powered schemes across the state at
Hadejia, Kiri kasamma and Guri stations in Hadejia
zone (Water Board) EAUXWELL Nig. Ltd. Hadejia 17,912,868.76 17,912,868.76 17,059,875.00 5/18/2016 12 w eeks 100 Completed
8
Rehab. of 4no. Water scheme at Basirka, Medu,
Hannun Giwa and Kore towns (STOWA) Laurat Global Ventures State 12,466,577.82 12,466,577.82 12,466,577.81 3/27/2016 8 weeks 100 Completed
9
Constr. of Solar Powered Water Supply Schemes as
Constituency Project at Zagau in Miga Constituency LOYALTY PROPERTIES LTD Miga 6,100,700.00 6,100,700.00 6,085,448.25 11/28/2016 8 weeks 100 Completed
10
Constr. of Solar Powered Water Supply Schemes as
Constituency Project at G/rafa in Buji Constituency LOYALTY PROPERTIES LTD Buji 6,104,700.00 6,104,700.00 6,089,438.25 11/28/2016 8 weeks 100 Completed
11 Improvement of Garki Town water supply Prestige Intergrated Serv . Garki 40,581,317.57 40,581,317.57 38,648,873.55 30/12/2016 100 Completed
BAL. C/F 146,566,345.41 146,566,345.41
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
BAL. B/F 146,566,345.41 146,566,345.41
12
Constr. of Solar Powered Water Supply Schemes as
Constituency Project at Sabaru in Kazaure
Constituency MARB ENG. & MULTY LTD Kazaure 6,171,900.00 6,171,900.00 6,156,470.28 11/28/2016 8 weeks 100 Completed
13
Constr. of Solar Powered Water Supply Schemes as
Constituency Project at Gwangi in Ringim
Constituency MARB ENG. & MULTY LTD Ringim 6,169,800.00 6,169,800.00 6,154,375.50 11/28/2016 8 weeks 100 Completed
14
Constr. of Solar Powered Water Supply Schemes as
Constituency Project at Diddigau in Roni Constituency MARB ENG. & MULTY LTD Roni 6,175,050.00 6,175,050.00 6,159,612.38 11/28/2016 8 weeks 100 Completed
15
Constr. of Solar Powered Water Supply Schemes as
Constituency Project at Masallachin Izala in Mallam
Madori Constituency LIMIS BRO & CO. LTD M/Madori 6,200,250.00 6,200,250.00 6,184,749.38 11/29/2016 8 weeks 100 Completed
16
Constr. of Solar Powered Water Supply Schemes as
Constituency Project at Zangon Buji in Dutse
Constituency MISTAB ENERGY INVT.LTD Dutse 6,094,200.00 6,094,200.00 6,078,964.50 11/29/2016 8 weeks 100 Completed
17
Constr. of Solar Pow ered Water Supply Schemes as
Constituency Project at Kadane in Birnin Kudu
Constituency A.A. ALJAZEERA AGRO LTD B/Kudu 6,169,800.00 6,169,800.00 6,154,375.50 30/12/2016 8 w eeks 100 Completed
18
Constr. of Solar Pow ered Water Supply Schemes as
Constituency Project at Aduw are in Babura
Constituency M UFABAM EX CONCEPT LTD Babura 6,900,000.00 6,900,000.00 6,074,775.00 11/29/2016 8 w eeks 100 Completed
19
Constr. of Solar Pow ered Water Supply Schemes as
Constituency Project at Ramfa in Kafin Hausa
Constituency ADZ GLOBAL LTD K/Hausa 6,140,400.00 6,140,400.00 6,125,049.25 11/29/2016 8 w eeks 100 Completed
20
Constr. of Solar Pow ered Water Supply Schemes as
Constituency Project at Albashi in Kaugama
Constituency SALNAWU GLOBAL LTD Kaugama 6,129,900.00 6,129,900.00 6,114,575.25 11/29/2016 8 w eeks 100 Completed
21
Constr. of Solar Pow ered Water Supply Schemes as
Constituency Project at Garw a in Gw aram
Constituency A.A. ALJAZEERA AGRO LTD Gw aram 6,296,850.00 6,296,850.00 6,281,107.88 11/29/2016 8 w eeks 100 Completed
22
Constr. of Solar Pow ered Water Supply Schemes as
Constituency Project at Kangal in Taura Constituency NUSHE BUSINESS REC. LTD Taura 6,083,699.00 6,083,699.00 6,068,490.66 11/29/2016 8 w eeks 100 Completed
BAL. C/F 215,098,194.41 215,098,194.41
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
BAL. B/F 215,098,194.41 215,098,194.41
23
Constr. of Solar Pow ered Water Supply Schemes as
Constituency Project at Akw ai ALLAH in Gagaraw a
Constituency DANM AWANKI NIG. LTD Gagaraw a 6,270,000.00 6,270,000.00 6,254,325.00 11/29/2016 8 w eeks 100 Completed
24
Constr. of Solar Pow ered Water Supply Schemes as
Constituency Project at Kokinami in Gumel
Constituency JAG & H INTERGRATED Gumel 6,094,200.00 6,094,200.00 6,078,964.50 11/29/2016 8 w eeks 100 Completed
25
Constr. of Solar Pow ered Water Supply Schemes as
Constituency Project at Andaza in Kiy aw a
Constituency DEM ASTBO VENTURES LTD Kiy aw a 6,162,922.50 6,162,922.50 6,147,515.19 11/29/2016 8 w eeks 100 Completed
26
Constr. of Hand pumps Water Supply Schemes as
Constituency Projects at Adugul, Kumo Rogo,
Dabazar Sambo, Fulanin Kankare and Daw an Dole in
Kany a Constituency Deetech NIG. LTD Babura 6,098,190.00 6,098,190.00 6,082,944.53 6/2/2017 8 w eeks 100 Completed
27
Constr. of Hand pumps Water Supply Schemes as
Constituency Projects at Balew a, Kazan Kukoki,
B/Gagare, Sharbi Kununu And Agur Mezan in Kafin
Hausa Constituency ADZ GLOBAL LTD K/Hausa 2,754,150.00 2,754,150.00 2,747,264.63 11/29/2016 8 w eeks 100 Completed
28
Constr. of Hand pumps Water Supply Schemes as
Constituency Projects at Maficin Sarki in Hadejia
Constituency BRIGHT STONE NIG LTD Hadejia 6,094,273.00 6,094,273.00 5,554,037.32 11/29/2016 8 w eeks 100 Completed
29
Constr. of Solar Pow ered Water Supply Schemes as
Constituency Project at Gunka Jahun Constituency BRIGHT STONE NIG LTD Jahun 6,094,373.00 6,094,373.00 5,554,137.06 11/29/2016 8 w eeks 100 Completed
30
Constr. of Solar Pow ered Water Supply Schemes as
Constituency Project at Mai-Hassan in Maigatari
Constituency BRIGHT STONE NIG LTD Maigatari 6,094,273.50 6,094,273.50 6,079,037.82 11/29/2016 8 w eeks 100 Completed
31
Constr. of Hand pumps Water Supply Schemes as
Constituency Projects at Bulakuru, Hausaw a,
Danw ay re, Botai and Baradu in Dutse Constituency M ISTAB ENERGY INVT.LTD Dutse 2,731,911.00 2,731,911.00 2,725,081.22 11/29/2016 8 w eeks 100 Completed
32
Constr. of Hand pumps Water Supply Schemes as
Constituency Projects at Makadi, Kay arda, Waje,
Fulanin Jarkasa And Tudun Yala Fulani in Babura
Constituency M UFABAM EX CONCEPT LTD Babura 2,562,000.00 2,562,000.00 2,293,751.25 11/29/2016 8 w eeks 100 Completed
BAL. C/F 266,054,487.41 266,054,487.41
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
BAL. B/F 266,054,487.41 266,054,487.41
33
Constr. of Hand pumps Water Supply Schemes as
Constituency Projects at Gw aram Senior Arabic
Secondry School, Salmande, Daliy a, Rambazau And
Isaw a in Gw aram Constituency A.A. ALJAZEERA AGRO LTD Gw aram 2,773,500.00 2,773,500.00 2,766,566.25 11/29/2016 8 w eeks 100 Completed
34
Constr. of Hand pumps Water Supply Schemes as
Constituency Projects at Gidan Inusa M/Ruw a,Giginy a
Bakw ai, Mamuna, U/Yakubu And Kafin Alhaji in Buji
Constituency LOYALTY PROPERTIES LTD Buji 2,725,850.00 2,725,850.00 2,719,035.38 11/29/2016 8 w eeks 100 Completed
35
Constr. of Hand pumps Water Supply Schemes as
Constituency Projects at Tsakuw aw a, Agufa
K/Yamma, Gidan Garke Jagalari, Maduga Sabuw a and
Gidan Garba in Miga Constituency LOYALTY PROPERTIES LTD Miga 2,717,000.00 2,717,000.00 2,528,662.50 17/02/2017 8 w eeks 100 Completed
36
Constr. of Hand pumps Water Supply Schemes as
Constituency Projects at Kauy en Boka, Yalaw a, Marke
U/Ganji, B/Kudu Tsohon Gari And Unity School in
Birnin Kudu Constituency BULANGU DRILLING SERVICES. B/Kudu 2,562,000.00 2,562,000.00 2,152,080.00 11/29/2016 8 w eeks 100 Completed
37
Constr. of Hand pumps Water Supply Schemes as
Constituency Projects at Tsima Junctiona, Tashako,
Raba, Tsima Waje And Rigar Mana'e in Kiy aw a
Constituency DEM ASTBO VENTURES LTD Kiy aw a 2,747,850.00 2,747,850.00 2,664,172.88 11/29/2016 8 w eeks 100 Completed
38
Constr. of Hand pumps Water Supply Schemes as
Constituency Projects at Tukuikui, Rigar Zigobiy a
(Maraba), Lafiy a Rigar Lamido Kaw u, Kury a And Garin
Kaba in Guri Constituency A.Y.H. INVT LTD Guri 2,748,375.00 2,748,375.00 2,741,504.06 11/29/2016 8 w eeks 100 Completed
39
Constr. of Hand pumps Water Supply Schemes as
Constituency Projects at Jama'ar Fulani, Bundu, Goran
Fulani, Tsaunin Gora And Tsakanin Roni Constituency M ARB ENG. & M ULTY LTD Roni 2,775,150.00 2,775,150.00 2,649,051.01 11/29/2016 8 w eeks 100 Completed
40
Constr. of Hand pumps Water Supply Schemes as
Constituency Projects at Banbare Gidan Sallau, Ka'el
Village, Gizo Babba And Kabobi Village in Kazaure
Constituency M ARB ENG. & M ULTY LTD Kazaure 2,769,900.00 2,769,900.00 2,468,463.37 11/29/2016 8 w eeks 100 Completed
BAL. C/F 287,874,112.41 287,874,112.41
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
BAL. B/F 287,874,112.41 287,874,112.41
41
Constr. of Hand pumps Water Supply Schemes as
Constituency Projects at Gaday aw a Fulanin Gabas
(Dagari), Nahuw a Fulani,Rubunji And Dan Gaw o in
Garki Constituency BARWA ENG COM P LTD Garki 2,728,425.00 2,728,425.00 2,114,440.65 11/29/2016 8 w eeks 100 Completed
42
Constr. of Hand pumps Water Supply Schemes as
Constituency Projects at Diliy ari, Madaci, Jiy an, Garin
Ando in Kiri-Kasamma Constituency ALH UM ARU BABANDOKI LTD K/Kasamma 2,764,125.00 2,764,125.00 2,757,214.69 11/29/2016 8 w eeks 100 Completed
43
Constr. of Hand pumps Water Supply Schemes as
Constituency Projects at Gabari, Garko, Sabuw ar
unguw a, Chadi And Yay ari in Hadejia Constituency M UHAL GLOBAL CONCEPT Hadejia 2,748,375.00 2,748,375.00 2,741,504.06 11/29/2016 8 w eeks 100 Completed
44
Constr. of Hand pumps Water Supply Schemes as
Constituency Projects at Boka Inusa Fulanin Magau,
Amanga v illage, Kabiw a v illage, Hardo Jauro Fulanin
D/Gumel and Fulanin Rambada in S/Tankarkar
Constituency UM ARCO ROOFING PROD. S/Tankarkar 2,748,375.00 2,748,375.00 2,661,618.75 11/29/2016 8 w eeks 100 Completed
45
Constr. of Hand pumps Water Supply Schemes as
Constituency Projects at U/kudu w aje Basirka,
Dikkw ana, U/Mal. Yusuf, Ganji and Gw adiko Asibiti in
Fagam Constituency RAM ADAN CONSTR. LTD Gw aram 2,773,312.50 2,773,312.50 2,766,379.22 11/29/2016 8 w eeks 100 Completed
46
Constr. of Solar Pow ered Water Supply Schemes as
Constituency Project at Rungo v illage in Fagam
Constituency RAM ADAN CONSTR. LTD Gw aram 6,223,350.00 6,223,350.00 6,207,791.63 20/02/2017 8 w eeks 100 Completed
47
Constr. of Solar Pow ered Water Supply Schemes as
Constituency Project at Garin Kosau in s/Tankarkar
Constituency UM ARCO ROOFING PROD. S/Tankarkar 6,083,699.90 6,083,699.90 6,068,490.66 11/29/2016 8 w eeks 100 Completed
48
Constr. of Solar Pow ered Water Supply Schemes as
Constituency Project at Ung. Malam in Yankw ashi
Constituency GRANITOID ENG. LTD. Yankw ashi 6,212,535.00 6,212,535.00 6,197,003.16 11/29/2016 8 w eeks 100 Completed
49
Constr. o f Hand pumps Water Supply Schemes as
Constituency Pro jects at Ganuwar Kuka, Kudigin,
Tsardawa, Tudun Gabi and Doguwar Tsamiya in Auyo
Constituency A.A. ALJAZEERA AGRO LTD Auyo 2,731,911.00 2,731,911.00 2,445,781.22 11/29/2016 8 weeks 100 Completed
50
Constr. o f Hand pumps Water Supply Schemes as
Constituency Pro jects at Luguwal, Kumo Rogo,
Dabazar Sambo, Fulanin Kankare and Dawan Dole in
Kanya Constituency Deetech NIG. LTD Babura 2,772,000.00 2,772,000.00 2,492,752.50 11/29/2016 8 weeks 100 Completed
51
Constr. o f Hand pumps Water Supply Schemes as
Constituency Pro jects at Karkarna town, Sabuwa
Fulani Gujiyar fulani, Kuda fulani and Rauda Fulani in
Yankwashi Constituency GRANITOID ENG. LTD. Yankwashi 2,748,375.00 2,748,375.00 2,741,504.06 11/29/2016 8 weeks 100 Completed
BAL. C/F 328,408,595.81 328,408,595.81
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
BAL. B/F 328,408,595.81 328,408,595.81
52
Constr. o f Hand pumps Water Supply Schemes as
Constituency Pro jects at Gari Uku Fulani, Fulanin Bara
M usa, Leventis, Girdo and Garin Gabas in M alam-
M adori Constituency LIM IS BROTHERS & CO. M /madori 2,816,625.00 2,816,625.00 2,809,583.44 11/29/2016 8 weeks 100 Completed
53
Constr. o f Hand pumps Water Supply Schemes as
Constituency Pro jects at Fulanin Karanka, Fulanin
Diginsa (Rigar A lh. Isah), Fulanin Batu (Batu Yamma),
Fulanin Garagura and Fulanin Kubsa in Birniwa
Constituency Hambiscon Nig. Ltd. Birniwa 2,735,360.00 2,735,360.00 2,728,521.60 11/29/2016 8 weeks 100 Completed
54
Constr. o f Hand pumps Water Supply Schemes as
Constitutuency Pro jects at Sabuwar unguwa, Kurket
G/Dabo, Roran Fulani, Daba Yamma and Kawti in Gwiwa
Constitutuency Isah Halilu Nig. Ltd. Gwiwa 2,762,025.00 2,762,025.00 2,755,119.94 1/2/2017 8 weeks 100 Completed
55
Constr. o f Hand pumps Water Supply Schemes as
Constitutuency Pro jects at Dangwabro, Gwabso,
Walawa, M alam Lawan mai Nono and Rigar Baushi in
M aigatari Constitutuency Nadada Ventures Nig. Ltd. M aigatari 2,755,800.00 2,755,800.00 2,748,910.50 1/2/2017 8 weeks 100 Completed
56
Constr. o f Solar Powered water supply scheme at
Santar Hayo in Gwiwa Constituency. Isah Halilu Nig. Ltd. Gwiwa 6,176,625.00 6,176,625.00 6,161,183.44 1/2/2017 8 weeks 100 Completed
57
Constr. o f Hand Pumps Water Supply Schemes as
Constituency Pro jects at Sabon Garin Yaya yamma,
Fitatin (Kwalau ward), Gidan Nagi, Gama Kauye and
Chukwaikwaiwa in Taura Constituency. Nushe Business Resources Taura 2,780,800.00 2,780,800.00 2,773,848.00 14/3/2017 8 weeks 100 Completed
58
Constr. o f Hand Pumps Water Supply Schemes as
Constituency Pro jects at Turinjiran yamma, Fadawa
Karama, M alumawar Kiri, Shagen Gabas and M ajiya in
Bulangu Constituency. Bulangu Drilling Srvices K/hausa 2,759,500.00 2,759,500.00 2,752,601.25 9/3/2017 8 weeks 100 Completed
59
Constr. o f Hand Pumps Water Supply Schemes as
Constituency Pro jects at Arewawa, Jaruwa, Tunfusa
Arewa, Riga and GDSS Jahun in Jahun Constituency. M uhal Global Concept Jahun 2,748,375.00 2,748,375.00 2,638,371.29 6/3/2017 8 weeks 100 Completed
60
Constr. o f Hand Pumps Water Supply Schemes as
Constituency Pro jects at Digawar Hausawa Fulani,
U/Dawa, Kaka'aiki Zara, Zangon Sallau Gabas and
M ajiyawar Kanawa in Ringim Constituency. M arb Eng. & M ulty Serv. Ringim 2,769,285.00 2,769,285.00 2,598,273.04 7/3/2017 8 weeks 100 Completed
61
Constr. o f Hand Pumps Water Supply Schemes (phase
II) as Constituency pro jects at Baushina, Danya, Garin
Daudu and Unguwar Wala Shede in Kafin Hausa
Constituency. A &T Global Resources K/Hausa 2,209,620.00 2,209,620.00 2,204,095.95 29/3/2017 8 weeks 100 Completed
62
Constr. o f Hand Pumps Water Supply Schemes (phase
II) as Constituency pro jects at Kwandiga, Garin Kanya,
Kanya, M aina Binda, Arbu Kofar Liman, Yalleman
Hausawa, Bultuwa and Kuka Kwance in Kaugama
Constituency. A &T Global Resources Kaugama 4,419,240.00 4,419,240.00 4,408,191.90 5/4/2017 8 weeks 100 Completed
63
Constr. o f Solar Water Supply Schemes (phase II) as
Constituency pro jects at Ruba (kafin Hausa ward) in
Kafin Hausa Constituency. A &T Global Resources K/Hausa 6,250,650.00 6,250,650.00 6,235,023.37 29/3/2017 8 weeks 100 Completed
BAL. C/F 369,592,500.81 369,592,500.81
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
BAL. B/F 369,592,500.81 369,592,500.81
64
Constr. o f Hand Pumps Water Supply Schemes (phase
II) as Constituency pro jects at M ajiyawa Kunama,
Layoyal, M argawa, Barebari, Jankawa, Farau and
Daguzau in Ringim Constituency. M arb Eng. & M ulti Serv. Ringim 3,866,835.00 3,866,835.00 3,857,167.91 29/3/2017 8 weeks 100 Completed
65
Constr. o f Hand Pumps Water Supply Schemes (phase
II) as Constituency pro jects at Katoge, Kofar A lh. Zabgi,
Tsamiyar Ilu and Fed. Govt. Girls College (FGC)
Kazaure in Kazaure Constituency. M arb Eng. & M ulti Serv. Kazaure 2,209,620.00 2,209,620.00 2,209,620.00 29/3/2017 8 weeks 100 Completed
66
Constr. o f Hand Pumps Water Supply Schemes (phase
II) as Constituency pro jects at Bosuwa Tsangaya,
Lallashi M akera, Hardo Jauro, Rugar M usa Ja'o ,
Fulanin Kankare, Hardo Gambo and Kaya Jamu in
M aigatari Constituency. M uhal Global Concept M aigatari 3,866,835.00 3,866,835.00 3,857,167.92 29/3/2017 8 weeks 100 Completed
67
Constr. o f Solar Powered Water Supply Scheme (phase
II) as Constituency pro jects at Kafi (Kanya ward) kanya
Constituency in Babura LGA. Deetech Nig. Ltd. Babura 6,075,825.00 6,075,825.00 6,060,635.43 29/3/2017 8 weeks 100 Completed
68
Constr. o f Solar Powered Water Supply Scheme (phase
II) as Constituency pro jects at M alam M adori
(M /M adori ward) in M alam M adori Constituency. Ramadan Constr. Ltd. M /M adori 6,250,650.00 6,250,650.00 6,235,023.37 29/3/2017 8 weeks 100 Completed
69
Constr. o f Solar Powered Water Supply Scheme (phase
II) as Constituency pro jects at M adachi (Kiri kasamma
ward) in Kirikasamma Constituency. Alh. Umar Baban Doki Ltd. Kirikasamma 6,270,000.00 6,270,000.00 6,254,325.00 29/3/2017 8 weeks 100 Completed
70
Constr. o f Solar Powered Water Supply Scheme (phase
II) as Constituency pro jects at Sabuwar Daba (M argadu
ward) in Guri Constituency. A.Y.H. Invest. Co. Ltd. Guri 6,144,600.00 6,144,600.00 6,129,238.50 29/3/2017 8 weeks 100 Completed
71
Constr. o f Solar Powered Water Supply Scheme (phase
II) as Constituency pro jects at Kore Sabuwa (Garin
Chiroma ward) in Gagarawa Constituency. Loyalty PropertiesLtd. Gagarawa 6,268,290.00 6,268,290.00 6,252,619.28 29/3/2017 8 weeks 100 Completed
72
Constr. o f Hand Pumps Water Supply Schemes (phase
II) as Constituency pro jects at Fulanin Kafa Ruwa, M ale
Fulani, Unguwar Shura, Baggade, Kankare, S/Unguwar
Hanyar Gumel, Gangara Bugaje, Unguwar Tsamiya,
M adalla, Takwasa, Jabirawa Fulani, Yantuba and
Gangara in Babura Constituency. M ufabamex Concept Ltd. Babura 7,181,265.00 7,181,265.00 7,163,311.83 29/3/2017 8 weeks 100 Completed
73
Constr. o f Hand Pumps Water Supply Schemes (phase
II) as Constituency pro jects at Gwaram, Jikas and
Dazara in Gwaram Constituency. A.A. A ljazeera Agro Properties Gwaram 1,657,215.00 1,657,215.00 1,653,071.96 29/3/2017 8 weeks 100 Completed
74
Constr. o f Hand Pumps Water Supply Schemes (phase
II) as Constituency pro jects at M azawa Kwanar Karo in
M iga Constituency. Loyalty Properties Ltd. M iga 552,405.00 552,405.00 552,405.00 29/3/2017 8 weeks 100 Completed
75
Constr. o f Hand Pumps Water Supply Schemes (phase
II) as Constituency pro jects at Gidan Riga, Dangolin
Kurori, M alamawa Narba, Kofar M alam Fulani and
Batsayi in Jahun Constituency. Loyalty Properties Ltd. Jahun 2,762,025.00 2,762,025.00 2,755,119.93 29/3/2017 8 weeks 100 Completed
76
Constr. o f Hand Pumps Water Supply Schemes (phase
II) as Constituency pro jects at Garin Dutse in Gagarawa
Constituency. Loyalty Properties Ltd. Gagarawa 552,405.00 552,405.00 552,405.00 29/3/2017 8 weeks 100 Completed
BAL. C/F 423,250,470.81 423,250,470.81
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
BAL. B/F 423,250,470.81 423,250,470.81
77
Constr. o f Hand pumps Water Supply Schemes (phase
II) as Constituency pro jects at Takaji, Yayari Yamma,
Tubali and Gorawa in Bulangu Constituency, K/Hausa
LGA. Bulangu Drilling Serv. K/Hausa 2,209,620.00 2,209,620.00 2,121,179.96 29/3/2017 8 weeks 100 Completed
78
Constsruction of Hand pumps Water supply
schemes (phase II) as constituency project at
Baushe, Katanga, Tambai and Kadirawan G.
Sarki in Kafin Hausa constituency A &T GOLOBAL K/Hausa 2,209,620.00 2,209,620.00 2,093,891.15 13/04/2017 8 weeks 100 Completed
79
Constsruction of Hand pumps Water supply
schemes (phase II) as constituency project at
Kwandiga, Garin Kanya, Kanya, Maina Binda,
Arbu Kofar Liman, Yalleman Hausawa, Bultuwa
and Kuka Kwance in Kaugama constituency A &T GOLOBAL Kaugama 4,419,240.00 4,419,240.00 4,187,782.31 5/4/2017 8 weeks 100 Completed
80
Construction of Solar Powered Water supply
schemes (Phase II) as constituency Projects at
Kantudu (Zango Ward ) in Gumel constituency JAG&H INT SVC Gumel 6,250,650.00 6,250,650.00 6,235,023.38 29/03/2017 8 weeks 100 Completed
81
Construction of Water collection point Makara
Huta, Fantai Bayan Bitenary, Yan koli, IlLALLA,
Chadi, Garko baya GSS Wunti, Bello Bayi and
Bayan GSS Aminu Yusuf (Sabuwar Unguwa),
Gawuna in Hadejia constituency ZURFAT INVT NIG LTD Hadejia 9,874,848.00 9,874,848.00 9,381,105.46 4/5/2017 8 weeks 100 Completed
82
Provision of additional water scheme at
Mapower devlopment Institute, Dutse BABAN DOKI GEN ENT Dutse 29, 244, 451.95 29, 244, 451.95 29,084,624.63 16/5/2017 12 weeks 100 Completed
83
Constr. Of Solar powered water supply scheme
(phase II) as constituency projects at Karkarna in
Yankwashi Constituency. GRANATOIDS ENG SERV. Yankwashi 6,214,000.00 6,214,000.00 6,198,465.00 21/6/2017 8 weeks 100 Completed
84
Constr. Of Solar powered water supply scheme
(phase II) as constituency projects at Tattari in
Maigatari Constituency. Muhal Global Concept Maigatari 6,074,000.00 6,074,000.00 6,058,815.00 21/6/2017 8 weeks 100 Completed
85
Constr. Of 2no. Hand pumps Water Supply
Schemes (2016) constituency project) phase II at
Feluwai and Daragi in Gwiwa Constituency . Isah Halilu Nig. Ltd. Gwiwa 1,104,810.00 1,104,810.00 1,104,810.00 25/3/2017 8 weeks 100 Completed
86
Constr. Of Complete Solar Powered Water
Supply Scheme (2016 Constituency project
phase I) at Adaha in Auyo Constituency. A.A. Aljazeera Nig. Ltd. Auyo 6,298,950.00 6,298,950.00 5,856,322.50 29/11/2016 8 weeks 100 Completed
87
Constr. Of Complete Solar Powered Water
Supply Scheme (2016 Constituency project
phase I) at Wurmawa in Jahun Constituency. Loyalty Properties Jahun 6,268,290.00 6,268,290.00 6,268,290.00 29/03/2017 8 weeks 100 Completed
BAL. C/F 474,174,498.81 474,174,498.81
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
BAL. B/F 474,174,498.81 474,174,498.81
88
Constr. Of handpumps water supply scheme(
Phase I-2017) as Constituency projects at
Danmarke, Bayan Gidan Lauya Jahun, Kabala
masallacin Idi Jahun, Gidan Jeji, Dingari Gidan
Makada, Gidan Dango Kofar Yamma and
Daradara in Jahun Constituency. LOYALTY PROPERTIES Jahun 5,593,350.00 5,593,350.00 5,579,366.63 28/08/2017 8 weeks 100 Completed
89
Constr. Of handpumps water supply scheme
(Phase I-2017) as Constituency projects at
Karkarna Sabuwa, Yankwashi Fulani, Gurjiya
Gari, Wusandu and Zango in
YankwashiConstituency. GRANATOIDS ENG Yankwashi 4,007,325.00 4,007,325.00 3,997,306.68 28/08/2017 8 weeks 100 Completed
90
Constr. Of Solar Powered Water Supply Schemes
(Phase I) as Constituency Project at Lafiya and
Adiyani in Guri Constituency AYH INVEST COMP LTD Guri 13,843,200.00 13,843,200.00 13,808,592.00 7/8/2017 8 Weeks 100 Completed
91
Constr. Of Solar Powered Water Supply Schemes
(Phase I) as Constituency Project at Farure in
Gwiwa Constituency THAQIB VENTURE LTD Gwiwa 6,967,800.00 6,967,800.00 6,950,380.50 7/8/2017 8 Weeks 100 Completed
92
Constr. Of Solar Powered Water Supply Schemes
(Phase I) as Constituency Project at Kadira in
Guri Constituency AYH INVEST COMP LTD Guri 6,921,600.00 6,921,600.00 6,904,296.00 7/8/2017 8 Weeks 100 Completed
93
Constr. Of Solar Powered Water Supply Schemes
(Phase I) as Constituency Project at Dunari,
Shayya and Majeri in Malam, Madori
Constituency LIMIS BROTHERS & CO M/madori 20,882,610.00 20,882,610.00 20,876,741.02 7/8/2017 8 Weeks 100 Completed
94
Constr. Of Solar Powered Water Supply Schemes
(Phase I) as Constituency Project at Dabawa and
Damfa in Babura Constituency MUFABAMEX CON LTD Babura 13,921,740.00 13,921,740.00 13,886,935.65 7/8/2017 8 Weeks 100 Completed
95
Constr. Of Solar Powered Water Supply Schemes
(Phase I) as Constituency Project at Kurjeni,
Kuduje and Rurau in Gwiwa Constituency MANHAF CONS NIG LTD Gwiwa 20,903,400.00 20,903,400.00 20,851,141.50 7/8/2017 8 Weeks 100 Completed
96
Constr. Of Solar Powered Water Supply Schemes
(Phase I) as Constituency Project at Unguwar
Bako and Gayawa in Garki Constituency ADZ GLOBAL SERV LTD Garki 13,666,020.00 13,666,020.00 13,631,854.95 7/8/2017 8 Weeks 100 Completed
97
Constr. Of Solar Powered Water Supply Schemes
(Phase I) as Constituency Project at Afarmo and
Tigima in Auyo Constituency ADZ GLOBAL SERV LTD Auyo 13,936,020.00 13,936,020.00 13,901,179.95 7/8/2017 8 Weeks 100 Completed
98
Constr. Of Solar Powered Water Supply Schemes
(Phase I) as Constituency Project at Kiyawa Town
in kiyawa Constituency ADZ GLOBAL SERV LTD Kiyawa 6,968,010.00 6,968,010.00 6,950,589.97 7/8/2017 8 Weeks 100 Completed
99
Constr. Of Solar Powered Water Supply Schemes
(Phase I) as Constituency Project at Kundu in
Taura Constituency NUSHE BUSINESS RESOR Taura 6,960,000.00 6,960,000.00 6,942,600.00 7/8/2017 8 Weeks 100 Completed
BAL. C/F 608,745,573.81 608,745,573.81
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
BAL. B/F 608,745,573.81 608,745,573.81
100
Constr. Of Solar Powered Water Supply Schemes
(Phase I) as Constituency Project at Kawari in
Gwaram Constituency AZZIDS NIG LTD Gwaram 6,982,500.00 6,982,500.00 6,965,043.75 7/8/2017 8 Weeks 100 Completed
101
Constr. Of Solar Powered Water Supply Schemes
(Phase I) as Constituency Project at Nassarawa
in Gwaram Constituency AZZIDS NIG LTD Gwaram 6,982,500.00 6,982,500.00 6,965,043.75 7/8/2017 8 Weeks 100 Completed
102
Constr. Of Solar Powered Water Supply Schemes
(Phase I) as Constituency Project at Kigin in Auyo
Constituency K MANU GEN CONST Auyo 6,968,010.00 6,968,010.00 6,950,589.98 7/8/2017 8 Weeks 100 Completed
103
Constr. Of Solar Powered Water Supply Schemes
(Phase I) as Constituency Project at Bareye and
Jijjigawa in Gagarawa Constituency A.A ALJAZEERA Gagarawa 13,941,260.00 13,941,260.00 13,906,406.85 7/8/2017 8 Weeks 100 Completed
104
Constr. Of Solar Powered Water Supply Schemes
(Phase I) as Constituency Project at Murdan
Kasa, Karkarna Arewa and Sabowa in Yankwashi
Constituency GRANTOIDS ENG SERV Yankwashi 20,834,100.00 20,834,100.00 20,782,014.75 7/8/2017 8 Weeks 100 Completed
105
Constr. Of Solar Powered Water Supply Schemes
(Phase I) as Constituency Project at Narba in
Jahun Constituency LOYALTY PROPERTIES LTD Jahun 6,786,150.00 6,786,150.00 6,769,184.62 7/8/2017 8 Weeks 100 Completed
106
Constr. Of Solar Powered Water Supply Schemes
(Phase I) as Constituency Project at Nafadawa in
Miga Constituency LOYALTY PROPERTIES LTD Miga 6,943,378.50 6,943,378.50 6,926,020.05 7/8/2017 8 Weeks 100 Completed
107
Constr. Of Solar Powered Water Supply Schemes
(Phase I) as Constituency Project at Gatare in
Birniwa Constituency LOYALTY PROPERTIES LTD Birniwa 6,889.050.00 6,889.050.01 6,871,827.37 7/8/2017 8 Weeks 100 Completed
108
Supply of Solar Powered Water Supply pumps
(Phase I) as Constituency Project at Jana,
Amaguwa, Gidan Lage, Sankara and Kwandari in
Ringim Constituency MARB ENG & MULTI SERV Ringim 5,000,047.00 5,000,047.00 3,990,037.54 7/8/2017 8 Weeks 100 Completed
109
Constr. Of Solar Powered Water Supply Schemes
(Phase I) as Constituency Project at Kanya
Babba, Bata and Fadi at Kanya Babba
Constituency in Babura Constituency DEETECH NIG LTD Babura 21,424,662.00 21,424,662.00 21,371,100.35 11/8/2017 8 Weeks 100 Completed
BAL. C/F 704,608,181.31 704,608,181.31
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
BAL. B/F 704,608,181.31 704,608,181.31
110
Constr. Of Hand Pumps Water Supply Schemes
(Phase I-2017) as Constituency Project at
Matsaro, Sabon Garu, Dubantu, Gabari, Layin
Alh Makeri Sabon Garu, Kantin Waje Bayan
Vocational, Yayari, Atafi, Chadi Anguwar Madaki,
Dallah, Bayan NTA, Bello Bayi, Makara Hutar
Duhu, Matsaro Layin Danbaba, Rumfa, Hudu and
Charbin Barau in Hadejia Constituency A. BARDE GLOBAL CON Hadejia 24,928,000.00 24,928,000.00 24,865,680.00 28/8/2017 8 Weeks 100 Completed
111
Constr. Of Hand Pumps Water Supply Scheme
(Phase I-2017) as Constituency Project at Gidan
Ja'o Hardo Kwalle, Matsatsagi, Baushe Sango,
Inwala, Tsinke, Musa Sayya, Hardo Sani,
Dausama, Tarana Sulani and Kiriha in Maigatari
Constituency NADADA VENTURES NIG Maigatari 8,809,762.50 8,809,762.50 8,787,738.09 28/8/2017 8 Weeks 100 Completed
112
Constr. Of Hand Pumps Water Supply Scheme
(Phase I-2017) as Constituency Project at
Unguwar Aliko (Jigawa Ward) Grave Yard Bayan
Asibiti Babura, Unguwar Makeri Insharuwa and
dan Amale Fulani in Babura Constituency MUFABAMEX CONCEPT Babura 3,202,000.00 3,202,000.00 3,193,995.00 28/8/2017 8 Weeks 100 Completed
113
Constr. Of Water Collection Points (Phase I-
2017) as Constituency Project at Kuloniya, Yan
Kwana-Kwana Mele, Maidabara and Karkasara
in Gumel Constituency JAG & H INT SERVICES Gumel 6,560,835.00 6,560,835.00 6,544,432.91 28/8/2017 8 Weeks 100 Completed
114
Constr. Of HandPumps Water Supply Schemes
(Phase I-2017) as Constituency Project at
Fulanin Garin Barka Arewa , Fulanin Dan Ama
Arewa, Danfarantama, Fulanin Barikin Faka and
Bekarya in Gumel Constituency JAG & H INT SERVICES Gumel 4,003,125.00 4,003,125.00 3,993,117.19 28/8/2017 8 Weeks 100 Completed
115
Constr. Of HandPumps Water Supply Schemes
(Phase I-2017) as Constituency Project at
Kundashe (Muku Ward) Jaya (Garki Ward) and
Government girls Secondary School Garki in
Garki Constituency ADZ GLOBAL SERVICES Garki 2,400,300.00 2,400,300.00 2,394,299.25 28/8/2017 8 Weeks 100 Completed
BAL. C/F 754,512,203.81 754,512,203.81
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
BAL. B/F 754,512,203.81 754,512,203.81
116
Constr. Of HandPumps Water Supply Schemes
(Phase I-2017) as Constituency Project at Barka
(Andaza Ward), Rigar Amina Ward. Dadin Duniya
Andaza , Firera (Andaza Ward), Yar Auta (Garko
Ward), Gidan Rabo ( Fake Ward) Jigawar Kaba
(Katanga Ward) Masaya (Fake Ward) Adakawa (
Andaza Ward) Kanlaha Guduba ( Katuka Ward)
Unguwar Madaki ( Katuka Ward) gabashi (
Andaza Ward) Bushe (Andaza Ward) and Gidan
Malu in Kiyawa Constituency ADZ GLOBAL SERVICES Kiyawa 11,201,400.00 11,201,400.00 11,173,396.50 28/8/2017 8 Weeks 100 Completed
117
Constr. Of HandPumps Water Supply Schemes
(Phase I-2017) as Constituency Project at Fagoji,
Gundun Mazare, Bambam, Gida Dubu, Katujen
Gaba and gidan Gamai in Dutse Constituency TALAKU INT SERV LTD Dutse 4,794,300.00 4,794,300.00 4,782,314.25 31/8/2017 8 Weeks 100 Completed
118
Constr. Of HandPumps Water Supply Schemes (Phase
I-2017) as Constituency Proeject at Rigar Buba
M adugu, Safaman Ganji, Jangwan Babale, Rigar M allam
Yaya Zugobiya, Rigar M allam Buba, Rigar hardo
Auduru, Zugobiya, Bodala, Rigar lamido M anu, Rigar
lamido Ruwa, Dagana and M argadu Sabon Fegi in Guri
Constituency A.Y.H INVST COM P LTD Guri 9,597,420.00 9,597,420.00 9,573,426.45 12/9/2017 8 Weeks 100 Completed
119
Constr. Of HandPumps Water Supply Schemes as
Constituency Pro ject at Falkin Jalo Nasarawa, Fulanin
Kuka uku, Fulanin Liman M ado, Fulanin Gangara and
Fulanin Dan'ama Gabas in Gumel Constituency JAG & H INT SERVICES Gumel 2,742,600.00 2,742,600.00 2,735,743.50 29/08/2017 8 Weeks 100 Completed
120 Rehab and Upgrading of Sara Water Schemes Sims Global Resources Gw aram 18,506,250.00 18,506,250.00 18,459,984.38 20/12/2017 2 w eeks 100 Completed
121
Constr of Solar powered water shemes at
Jamaar suga town in K/kasamma. A.G. Global Golden Serv. K/kasamma 6,968,010.00 6,968,010.00 6,950,589.98 13/11/2017 8 Weeks 100 Completed
122
Constr. Of solar powered water schemes at
Tarabu in K/kasamma Loyalty Properties Ltd. K/kasamma 6,943,387.00 6,943,387.00 6,926,028.53 13/11/2017 8 Weeks 100 Completed
123 Constr o f 1no. Hand pump at M akwarari Fulani A. A. Aljazeera Agro Gagarawa 800,100.00 800,100.00 800,100.00 28/08/2017 2 weeks 100 Completed
124
Constr. o f Hand Pumps Water Supply Schemes (phase
II) as Constituency pro jects at Rigar Hardo Shuaibu,
Rugar Yola, Rugar Gambo Baki, Nasarawa Qtrs. Rugar
Gaiye Kujuru, M ajanguwa and Zoriyo in Guri
Constituency. A.Y.H. Investment Co. Guri 3,866,835.00 3,866,835.00 3,857,167.91 29/3/2017 8 weeks 100 Completed
T OT A L 819,932,505.81 819,932,505.81
Min. of Works
P OST C ON T R A C T P R OJEC T EVA LUA T ION
S/ N . P R OJEC T EXEC UT OR LOC A T ION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS
AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %
1
Installation of solar=pow ered to electric-pow ered street light at Ringim tow n
(Additional & rev ised scope) Saby Int. Nig Ltd Ringim 27,542,025.00 65,127,841.10 46,298,150.15 18/9/09 20 w eeks 72 Completed
2 Consultancy Superv ision for the Constr. of Sukullufi-Aujara roads Himma Tech. Serv ices Jahun 73,320,508.60 73,320,508.60 73,319,457.65 31/12/2012 18 months 100 Completed
3 Urban Tow ns Streetlighting Project at M/madori Tow n Dutsen Taura Nig. LTD M/madori 280,310,404.50 280,310,404.50 280,202,842.50 11/11/2013 9 Months 100 Completed
4 Construction of Bamaina-zazika-Nasaru Road CGC Nig LTD B/kudu 1,095,894,699.37 1,587,926,018.26 1,587,926,018.26 2/13/2014 8 Months 100 Completed
5 Consultancy Serv ices for eastern by e pass (phase II) Landbase Eng. K/Kassamma 71,638,976.48 71,638,976.48 65,153,250.54 29/8/13 12 w eeks 100 Completed
6
Commissioning as Consultant on the superv ision of the Constr. of Maigatari-
Galadi-Karmashe-Karanka-Diginsa-Bursali-Kubsa-Birniw a road (114.6km)
(phase I) Himma Tech. Serv ices Maigatari 61,679,332.66 61,679,332.66 61,125,520.26 11/22/2013 16 months 100 Completed
7
Commissioning as Consultant on the Superv ision of the Constr. of Bamaina-
Zazika road Medal Civ il Eng. Consultants B/kudu 40,843,641.73 40,843,641.73 40,189,448.81 2/13/2014 10 months 100 Completed
8
Commissioning as Consultant on the Superv ision of the Urban Tow n
Streetlight Project at Auy o, M/Madori, K/Kasamma and 9No. General
Hospitals BOK Eng. Ltd. K/Kassamma 39,390,940.95 39,390,940.95 36,275,436.18 23/04/2014 100 Completed
9
Commissioning as Consultant on the superv ision of the Constr. of Andaza-
Tsirma-Gadiw a road spur from Fed. Road -Magama (phase 1) 45.73km Harad Nig. Ltd. Kiy aw a 55,376,646.51 55,376,646.51 53,868,283.74 5/22/2015 16 months 100 Completed
10
Constr. of Ky arama-Gasakole-Dadin Kow a-Danmakeri-Kasuw ar Dadi-
Sankara-Amaguw a-Tofa-Kagadama road (Spur from Ky arama to Shengel)
(29.95km) Geraw a Global Ringim 3,807,576,470.00 4,354,463,034.37 4,291,665,717.15 12/16/2014 18 months 100 Completed
11
Constr. of Andaza-Tsirma-Ataw ame-Damutaw a-Gadew a road & Spur from
Fed. Road-Damutaw a-Magama (45.73km) (phase I) Alren Constr. Co. Kiy aw a 3,861,309,347.91 3,861,309,347.91 3,855,875,910.04 1/19/2015 14 months 100 Completed
12
Letter of Commissioning/Engagement as Consultant for the Superv ision of
the Constr. of Ky arama-Kagadama road (spur from Ky arama-Shengel)
(29.95km) Himma Technical Serv ices Ringim 67,480,973.28 67,480,973.28 65,747,897.30 1/23/2015 18 months 100 Completed
13
Letter of Commisioning as Consultant on the Superv ision of the Constr. of
Roni-Mahuta-Bushe-Kay a-Tsakani-Gangare-Amary aw a-Mamudaw a-
Jigaw a-Gora-Gada road (49.19km) (phase II) UKM Civ il Eng. Roni 42,996,221.19 42,996,221.19 40,788,772.50 11/22/2015 18 months 100 Completed
14 Urban Tow ns Streetlighting Project at Garki Tow n Saby Int. Project LTD Garki 205,950,996.00 205,950,996.00 169,980,153.52 13/11/2013 8 Months 100 Completed
15 Constr. of Feeder road at Shafar-G/Sani-Daguzau in Ringim L.G.A. Yanduna v entures Ringim 326,872,816.20 326,872,816.20 315,510,451.20 17/02/2014 8 months 100 Completed
16 Commissioning as Consultant for the Constr. of K/Hausa Tow nship roads KAP Civ il Eng. K/Hausa 63,152,695.50 63,152,695.50 61,494,937.32 1/16/2012 12 months 100 Completed
17 Re-Constr. of Kafin Hausa Tow nship road (6.30km) Afdin Constr. Co. Ltd. K/Hausa 1,093,411,074.76 874,515,259.90 874,515,250.00 4/4/2016 8 months 100 Completed
18 Constr. of Roni-Amary aw a-Gada (phase II) Alren Constr. Co. Ltd. Kazaure 2,396,820,976.20 2,396,820,976.20 2,395,491,359.90 11/22/2013 24 months 100 Completed
19
Constr. of Gagaraw a-Maisheda-Damaski Maikirabo-Madaka-Mallam Baki-
Kangarw a-Bosuw a road (Spur from Madaka to Maikilili) (29.01km) Gerawa Global Eng. Ltd. Gagaraw a 3,416,602,936.95 3,416,602,936.95 3,409,546,179.90 28/12/2016 14 months 100 Completed
20 Constr. of Asphalt concrete ov erlay of Tasheguw a-Guri road (42.14km) CGC Nigeria Ltd. Guri 2,355,917,411.62 2,355,917,411.62 2,355,603,804.48 30/12/2016 15 months 100 Completed
Balance C/F 19,384,089,095.41 20,241,696,979.91
P OST C ON T R A C T P R OJEC T EVA LUA T ION
S/ N . P R OJEC T EXEC UT OR LOC A T ION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS
AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %
Balance B/F 19,384,089,095.41 20,241,696,979.91
21 Construction of Manga-Takw asa road (4.5km) Feeder road Yanduna Ventures Nig. Ltd. Babura 64,396,253.25 64,396,253.25 64,086,015.00 28/12/2016 5 months 100 Completed
22
Constr. of Estern by e-pass road, Araw a-Kubay au-Masama-Gafta-Baturiy a-
Una(Spur to Yalw a-Musari)-Chacharan-Abunabo-Chapchapno-Lafiy a-Kadira-
Arinjasko-Matara-Abir-Guri road (phase II) (36km) CGC Nigeria Ltd. Kiri kasamma 3,918,044,342.91 3,918,044,342.91 3,888,415,559.18 5/4/2013 14 months 100 Completed
23
Constr. Of 2-SPAN Bridge as Change of Scope from 2No. 3-Cells box
culverts on Gwaram-Basirka road. Alren Constr. Co. Ltd. Gwaram 292,696,945.76 292,696,945.76 292,621,229.25 1/3/2017 6 months 100 Completed
24
Supply and Installation of Stand-Alone Solar Streetlight Poles with
Accessories (100 units) at Kanya Babba in Babura LGA. (change of
scope) SIMS Global Resoures Babura 63,283,500.00 63,283,500.00 63,283,500.00 6/3/2017 12 weeks 100 Completed
25
Supply and Installation of Stand-Alone Solar Streetlight Poles with
Accessories (100 units) along Old Police H/qtrs. To Garu road at
Dutse LGA. (change of scope) SIMS Global Resoures Dutse 63,283,500.00 82,479,600.00 82,479,600.00 6/3/2017 12 weeks 100 Completed
26
Supervision of the construction of of Maigatari-Galadi-Girbobo-
Diginsa-Birniwa Road (Phase III) (44.7KM) HIMMA TECH SERV. Maigatari 101,449,900.04 101,449,900.04 18/05/2017 13 months Completed
27
Supervision of the construction of Andaza-Tsirma-Damutawa-
Gadewa-Ajaura Road (Phase II) (14.230KM) HARAD NIG LTD Jahun 29,194,382.97 29,194,382.97 26,413,965.55 18/05/2017 12 months 100 Completed
28
Supervision of the construction of Gagarawa-Maisheda-Damaski
Maikirabo-Madaka-Mallam baki-Kangarwa-Bosuwa Road (SPUR
from Madaka to Maikilili) (29.01KM) WURO ASSC ENGR & PRJ Gagarawa 59,790,551.40 59,790,551.40 54,861,496.26 11/4/2017 14 months 100 Completed
29
Rehab. and Reconnection of Taura-Gujungu-Ajaura and Chuwasu-
Chakwaikwaiwa ITC Lines Al-majeed Constr. Co. Taura 29,567,211.07 29,567,211.07 29,370,109.59 3/3/2017 3 months 100 Completed
30
Consultancy services for the Constr. Of babaldu-Wurno-Jangargari-
Buji-Falgeri-Sagu road Wuro Associates Buji 55,961,055.70 55,961,055.70 55,959,750.00 2/12/2012 24 months 100 Completed
31 Consultancy services for the Constr. of Gwaram township road Himma Tech. Services Gwaram 57,075,600.00 57,075,600.00 57,033,860.84 17/12/2012 12 months 100 Completed
32
Constr. of Line Drain and Culvert (620M) at Dantanoma (Layin
Transformer in Gumel Town. PULLAD GLOBAL LTD Gumel 20,891,855.91 39,885,501.54 39,884,124.10 3/7/2017 12 weeks 100 Completed
33
Extention of Electricity at Bello Bayi, Agumau and Maman Wale
Quarters in Hadejia and Purchase of Thirty Five (35) Number
2.5KVA Gasoline Generators for Distrubution to Mosques in
Hadejia Constituency XTRAXX 99 INTGRATED Hadejia 54,237,645.52 54,237,645.52 54,224,458.51 13/09/2017 16 weeeks 100 Completed
34 Electrification of Kwadiya town in Dutse LGA. Al-sabur Global Links Dutse 21,304,075.72 21,304,075.72 21,301,811.56 11/9/2017 6 weeks 100 Completed
35 Re-constr. of Unity Pentagon Roundabout-Disina Junction road Retercha Co. Ltd. Dutse 70,942,298.85 70,942,298.85 70,942,284.79 20/11/2017 4 Weeks 100 Completed
36 Rehab. Of Karnaya to Dundubus ITC Line in Dutse LGA. Yalwa Oil & Gas Ltd. Dutse 5,114,056.50 5,114,056.50 5,114,056.50 22/11/2017 8 weeks 100 Completed
37 Constr. Of Andaza-Tsirma-Ataw ame-Damutaw a-Gadew a road (phase II) Alren Construction Co. Ltd. Jahun 1,858,611,617.41 1,858,611,617.41 1,858,611,617.41 19/10/2016 14 months 100 Completed
TOTAL 26,149,933,888.42 27,045,731,518.55
Min. of Education
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT COMPL. STATUS REMARKS
AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K DATE PERIOD IN %
1 Furnishing of Academic and Admin. Block at Jigawa State University , K/Hausa Interior Wood Works K/Hausa 105,927,097.50 105,927,097.50 105,927,097.50 17/10/2014 4months 100 Completed
2
Constr. of Islamiyya classroom Blocks at Garki Cikin Gari and Kangari (Kargo
ward) in Garki Constituency MMZ Garki Constr. Ltd. Garki 5,606,595.50 5,606,595.50 5,606,595.50 29/12/2016 6 weeks 100 Completed
3
Constr. of Islamiyya classroom Blocks at Hammado Between G/Kailu and Garin-
Baki in Gumel Constituency JAG & H INT Gumel 5,575,714.53 5,575,714.53 5,575,714.53 29/12/2016 6 weeks 100 Completed
4
Constr. of Islamiyya classroom Blocks at Kagadama (Tofa ward) and J/Kadaje
(Ringim Ward) in Ringim Constituency MARB ENG.& MULT LTD. Ringim 5,385,740.22 5,385,740.22 5385740.22 29/12/2016 6 weeks 100 Completed
5
Constr. of Islamiy y a classrooms Blocks at Tigima and Safa-Karama in Auy o
Constituency A.A. ALJAZEERA AGRO Auy o 5,797,788.48 5,797,788.48 5,797,788.48 29/12/2016 6 w eeks 100 Completed
6
Constr. of Islamiy y a classrooms Blocks atYakana (Kanba Ward) and Z/Mundi
(Gasakoli Ward) in Kany a Babba Constituency Babubra Local Gov t Area DEETECH NIG LTD Babura 5,299,652.82 5,299,652.82 5,299,652.82 29/12/2016 6 w eeks 100 Completed
7
Constr. of Islamiy y a classrooms Blocks at Kw agga and Dandi in Kazaure
Constituency DEETECH NIG LTD Kazaure 5,416,454.82 5,416,454.82 5,416,454.40 29/12/2016 6 w eeks 100 Completed
8
Constr. of Islamiy y a classrooms Blocks at Medu and Kany u in Gagaraw a
Constituency M ODANG INVT LTD Gagaraw a 5,456,100.68 5,456,100.68 5,456,100.68 29/12/2016 6 w eeks 100 Completed
9
Constr. of Islamiy y a classrooms Blocks at Daragi/D. Sarki and Marganta in Gw iw a
Constituency ISA HALILUNIG LTD Gw iw a 5,590,792.62 5,590,792.62 5,590,792.62 29/12/2016 6 w eeks 100 Completed
10
Constr. of Islamiy y a classrooms Blocks at Hadejia Cikin Gari in Hadejia
Constituency UBJ NIG LTD Hadejia 5,579,391.68 5,579,391.68 5,579,391.67 29/12/2016 6 w eeks 100 Completed
11
Constr. of Islamiy y a classroom Blocks at Kaigamari and Malamaw ar Tudu in
Bulungu Constituency Kafin Hausa Local Gov t Area KAWU NIG LTD K/Hausa 5,613,437.06 5,613,437.06 5,613,437.06 29/12/2016 6 w eeks 100 Completed
12
Constr. of Islamiy y a classroom Blocks at Mairakumi Kashindula and Gandun Sarki
in Malam Madori Constituency AZZIDS NIG ENT LTD M/Madori 5,570,739.68 5,570,739.68 5,570,739.68 29/12/2016 6 w eeks 100 Completed
13
Contract. of Islamiy y a classroom Blocks at Ban'iy aka and Mamudaw a in Roni
Constituency UM AR ALIYU & SONGS LTD Roni 5,291,539.60 5,291,539.60 5,291,539.60 29/12/2016 6 w eeks 100 Completed
14
Constr. of 2NO. Block of Six Seater Pit Latrine and Renov ation of Students Hostel at
GGSS Sule Tankarkar. STEP BY STEP INT LTD S/tankarkar 17,374,267.13 17,374,267.13 17,370,747.64 30/12/2016 8 w eeks 100 Completed
15 Renov ation of classroom Block at GGASS Danzomo (9no.) YAYARIN TUKUR NIG LTD S/tankarkar 16,329,231.83 16,329,231.83 16,206,031.41 30/12/2016 8 w eeks 100 Completed
16 Renov ation of classroom Blocks at GGASS Babura. WAJAB BUILDING & CONSTR. Babura 14,637,375.54 14,637,375.54 14,585,218.68 30/12/2016 8 w eeks 100 Completed
17 Renov ation of 13NO. Students Hostel at GGASS Babura BABANDOKI GEN ENT LTD Babura 32,055,802.60 32,055,802.60 30,524,201.65 30/12/2016 7 w eeks 100 Completed
18 Renov ation of 5NO. Staff Quarters at GGASS Babura BABANDOKI GEN ENT LTD Babura 37,105,584.99 37,105,584.99 36,534,123.05 30/12/2016 7 w eeks 100 Completed
BAL. C/F 289,613,307.28 289,613,307.28
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT COMPL. STATUS REMARKS
AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K DATE PERIOD IN %
Bal. B/F 289,613,307.28 289,613,307.28
19 Renov ation of 6NO. Junior Staff Quarters at GGASS Danzomo (A) M OJAZ CONSTR LTD S/tankarkar 20,644,859.82 22,969,092.72 22,949,098.58 30/12/2016 7 w eeks 100 Completed
20 Renov ation of 6NO. Junior Staff Quarters at GGASS Danzomo (B) M OJAZ CONSTR LTD S/tankarkar 20,644,859.82 22,969,092.72 22,949,098.58 30/12/2016 8 w eeks 100 Completed
21 Construction of 2NO. Block of Six Seater Pit Latrineat GUSS Malam Madori. HARUNA LADAN INVT M/madori 3,721,904.40 3,721,904.40 3,552,740.48 30/12/2016 12 w eeks 100 Completed
22 Construction of 1NO.Students Hostel at GUSS Aujara M ODANG INVT LTD Jahun 25,625,472.89 25,625,472.89 25,602,883.22 30/12/2016 8 w eeks 100 Completed
23 Contract For the Construction of 2NO. Block of 3-Classroom at GGUSS Kazaure NABCOM TECH NIG LTD Kazaure 15,483,179.18 15,483,179.18 15,476,538.46 30/12/2016 8 w eeks 100 Completed
24 Constr. Of Line Drainage at GUSS Malam Madori HARUNA LADAN INVT M/madori 13,249,740.69 13,249,740.69 12,681,057.13 30/12/2016 8 w eeks 100 Completed
25 Renov ation of Senior Staff Quarters at Gov t Girls Arabic Secondary School Babura. A.H.F. GLOBAL NIG LTD Babura. 36,842,654.55 36,842,654.55 36,704,498.23 30/12/2016 8 w eeks 100 Completed
26 Constr. Of 1NO. Students Hostel at GUSS Malam Madori (A) HARUNA LADAN INVT M/madori 25,625,472.89 27,815,040.00 27,808,474.38 30/12/2016 12 w eeks 100 Completed
27 Constr. of 1NO. Students Hostel at GUSS Malam Madori (B) HARUNA LADAN INVT M/madori 25,625,472.89 27,815,040.00 27,808,474.38 30/12/2016 12 w eeks 100 Completed
28 Constr. Of 1NO. Students Hostel at GUSS Malam Madori (C ) HARUNA LADAN INVT M/madori 25,625,472.89 27,815,040.00 27,808,474.38 30/12/2016 12 w eeks 100 Completed
29
Contract For the Renov ation of Admin Block, ICT, Biology Lab and Toilets at GSS
Aujara M ODANG INVT LTD Jahun 7,538,982.10 7,538,982.10 7,031,853.41 30/12/2016 8 w eeks 100 Completed
30 Constr. Of Students Hostel at GUSS Malam Madori (D) HARUNA LADAN INVT M/madori 25,625,472.89 27,815,040.00 27,808,474.38 30/12/2016 8 w eeks 100 Completed
31
Contract For the Renov ation of Students Hostel at Gov t Girls Unity Secondry School
Kazaure AL-HAM SAD INVT LTD Kazaure 11,391,437.71 11,391,437.71 11,390,392.10 30/12/2016 7 w eeks 100 Completed
32
Constr. Of 2-Block of Six Saeter Pit Latrine and Renov ation of Dutse House at Gov t
Girls Unity Secondry School Kazaure. M UTAL INFRASTRUCTURE LTD Kazaure 9,039,611.35 9,039,611.35 8,773,990.17 30/12/2016 8 w eeks 100 Completed
33 Constr. of 1no. Students Hostel at Gov t Girls Unity Secondry School Kazaure AL-HAM SAD INVT LTD Kazaure 25,625,472.75 25,625,472.75 25,616,340.76 30/12/2016 8 w eeks 100 Completed
34 Renov ation of Students Hostel at Gov t Girls U nity Secondry School Kazaure M UTAL INFRASTRUCTURE LTD Kazaure 14,804,448.60 14,804,448.60 14,698,590.09 30/12/2016 7 w eeks 100 Completed
35 Constr. Of 5NO. Block of Six Seater pit Latrine at GUSS Malam Madori M .I. JAHUN COM M & GEN ENT M/madori 9,304,761.00 9,304,761.00 9,113,376.20 30/12/2016 12 w eeks 100 Completed
36 General Renov ation of 3NO. Classroom Blocks at GGASS Danzomo ALLAH ABIN DOGARA ENT Gagaraw a 11,940,648.89 11,940,648.89 11,906,824.19 30/12/2016 8 w eeks 100 Completed
37 Renov ation of Senior StaffQUARTERS at GGASS Danzomo UM AR ALIYU & SONGS LTD Gagaraw a 8,986,440.89 8,986,440.89 8,595,000.62 30/12/2016 7 w eeks 100 Completed
38 Renov ation of 6no. Students Hostels at GGASS Danzomo AL-SAHIH GEN ENT LTD Gagaraw a 14,586,233.24 14,586,233.24 14,548,234.14 30/12/2016 8 w eeks 100 Completed
39
Constr. of Islamiy y a classroom Blocks at J/w aw u and S/gari malanta in
Kirikasamma Constituency Alh. Umaru Babandoki K/kassamma 5,811,197.99 5,811,197.99 5,811,197.99 29/12/2016 6 w eeks 100 Completed
40
Constr. of Islamiy y a classroom Blocks at Gany aw a (Majiy aw a w ard) and Kauy an
Mata (Kw alam w ard) in Taura Constituency Abugani Gen. Invest. Taura 4,994,767.54 4,994,767.54 4,994,767.15 29/12/2016 6 w eeks 100 Completed
41
Constr. of Islamiy y a classroom Blocks at Zandam ta Gabas and Gw aram k/Gabas
in Gw aram Constituency Nushe Business Res. Gw aram 5,011,526.08 5,011,526.08 5,011,526.08 29/12/2016 6 w eeks 100 Completed
42
Constr. of Islamiy y a classroom Blocks at Sule-tankarkar cikin gari and Takatsaba in
S/tankarkar Constituency Nushe Business Res. S/tankarkar 5,592,369.88 5,592,369.88 5,592,369.69 29/12/2016 6 w eeks 100 Completed
43
Constr. of Islamiy y a classroom Blocks at B/k gari and Kantoga in B/kudu
Constituency Nushe Business Res. B/kudu 5,592,369.68 5,592,369.68 5,592,369.69 29/12/2016 6 w eeks 100 Completed
44
Supply of 1020NO. 3-Seater Desks and Benches to Some Boarding Senior
Secondary Schools Across the State. NADAK IND LTD Across the state 15,311,704.50 15,311,704.50 15,311,704.50 30/12/2016 3 w eeks 100 Completed
BAL. C/F 683,859,842.39 697,266,576.63
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT COMPL. STATUS REMARKS
AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K DATE PERIOD IN %
Bal. B/F 683,859,842.39 697,266,576.63
45
Supply of 760NO. Double bunk Bed to Some Boarding Senior Secondary Schools
Across the State. AL-HAM SAD INVT LTD Across the state 21,683,457.78 21,683,457.78 21,683,457.78 30/12/2016 3 w eeks 100 Completed
46
Constr. of Islamiy y a classroom Blocks at Karkarna and Yankw ashi Cikin Gari in
Yankw ashi Constituency . Granitoids Eng. Serv ices Ltd. Yankw ashi 5,811,197.99 5,811,197.99 5388504.57 29/12/2016 6 w eeks 100 Completed
47
Constr. of Islamiy y a classroom Blocks at Basirka fada and Basirka Wudilaw a in
Fagam Constituency , Gw aram LGA Ramadan Constr. Limited Gw aram 5,540,390.40 5,540,390.40 5,540,390.40 29/12/2016 6 w eeks 100 Completed
48
Constr. of Islamiy y a classroom Blocks atAndaza gabas and Markiba in Kiy aw a
Constituency . Damastbo Ventures Ltd. Kiy aw a 5,597,930.52 5,597,930.52 5,597,930.52 29/12/2016 6 w eeks 100 Completed
49
Constr. of Islamiy y a classroom Blocks at Majjanna/Diginsa w ard and Kakori/Birniw a
w ard in Birniw a Constituency . Gidan Adede Gen. Entp. Ltd. Birniw a 5,449,021.81 5,449,021.81 5,449,021.80 15/02/2017 6 w eeks 100 Completed
50
Constr. of Islamiy y a classroom Blocks at Tsakuw aw a and Gululu in Miga
Constituency . Loy alty Properties Ltd. Miga 5,493,579.61 5,493,579.61 5,493,579.60 29/12/2016 6 w eeks 100 Completed
51
Constr. of Islamiy y a classroom Blocks at Achau B/titi and Farfada Village in Jahun
Constituency . Loy alty Properties Ltd. Jahun 5,604,756.94 5,604,756.94 5,604,756.94 29/12/2016 6 w eeks 100 Completed
52
Constr. of Islamiy y a classroom Blocks at Dutse Dubeni (Madobi w ard) and Sabuw ar
Takur in Dutse Constituency . Al-kasam Jannah Nig. Ltd. Dutse 5,551,958.00 5,551,958.00 5,551,958.00 29/12/2016 6 w eeks 100 Completed
53
Constr. of Islamiyya Classroom Blocks at Shabarawa (Fulata ward) and
Tsirya (Madana ward) in Maigatari Constituency Muhabib Nig. Ltd. Maigatari 5,592,369.68 5,592,369.68 5,592,396.68 29/12/2016 6 weeks 100 Completed
54
Constr. of Second phase Islamiyya Classroom block at Dangyatin in Miga
Constituency AMIA Integrated Serv. Miga 2,746,789.80 2,746,789.80 2,746,789.80 20/3/2017 6 weeks 100 Completed
55
Constr. of Second phase Islamiyya Classroom blocks at Gidan Kanawa
(Kanya ward) in Kanya Babba Constituency in Babura LGA. Detech Nigeria Ltd. Babura 2,649,826.41 2,649,826.41 2,649,826.41 20/3/2017 6 weeks 100 Completed
56
Constr. of Second phase Islamiyya Classroom blocks at Jabo town in
Bulangu in Constituency in K/Hausa LGA. Kawu Nigeria Ltd. K/Hausa 2,805,718.53 2,805,718.53 2,805,718.53 4/4/2017 6 weeks 100 Completed
57
Constr. of Second phase Islamiyya Classroom blocks at Janbulo (Arewa
ward) in Kazaure Constituency Dutse Taura Constr. Co. Kazaure 2,708,227.41 2,708,227.41 2,708,227.41 20/3/2017 6 weeks 100 Completed
58
Constr. of Second phase Islamiyya Classroom blocks at Guntai ward in
Gwiwa Constituency. Isah Halilu Nig. Ltd. Gwiwa 2,795,396.31 2,795,396.31 2,795,369.31 4/4/2017 6 weeks 100 Completed
59
Constr. of Second phase Islamiyya Classroom block at Madaci town in
Kirikasamma Constituency. Alh. Umar Baban Doki Ltd. Kirikasamma 2,801,000.00 2,801,000.00 2,801,000.00 20/3/2017 6 weeks 100 Completed
60
Constr. of Second phase Islamiyya Classroom blocks at Agamo (Gamawa
Juwai ward) in Auyo Constituency. A.A. Aljazeera Agro Properties Auyo 2,898,894.24 2,898,894.24 2,898,872.19 4/4/2017 6 weeks 100 Completed
61
Constr. of Second phase Islamiyya Classroom block at Jahun town behind
police stationin Jahun Constituency. Loyalty Properties Ltd. Jahun 2,800,000.00 2,800,000.00 2,800,000.00 20/3/2017 6 weeks 100 Completed
62
Construction of second Phase Islamiyya Classroom block at Addani
(Gurjiya Ward) in Yankwashi constituency GRANATOIDS ENGR Yankwashi 2,694,252.27 2,694,252.27 2,694,252.27 20/3/2017 6 weeks 100 Completed
63
Procurement and Apply of Termites and Bats Control Chemicals for 87no.
Schools across the State Ngloma Constr. Co. Across the state 12,789,000.00 12,789,000.00 12,180,000.00 19/4/2017 8 weeks 100 Completed
64 Purchase of 2,000 Sets of Classroom Furniture FURNI-ELECT GLOBAL Across the state 30,000,000.00 30,000,000.00 30,000,000.00 20/04/2017 12 weeks 100 Completed
BAL. C/F 817,873,610.09 831,280,344.33
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
BAL. B/F 817,873,610.09 831,280,344.33
65 Purchase of 4,000 Sets of Classroom Furniture ABDUL-COM PROJECT Across the state 60,000,000.00 60,000,000.00 60,000,000.00 20/04/2017 12 weeks 100 Completed
66
Constr of Islamiyya Classroom at Andaza and Markiba in Kiyawa
Constituency Damastbo Ventures Ltd. Kiyawa 5,597,930.52 5,597,930.52 5,597,930.52 29/12/2016 6 months 100 Completed
67
Constr of second phase Islamiyya classroom block at Janbulo (Arewa
ward) in kazaure constituency. Dutsen Taura Nig. Ltd. Kazaure 2,708,227.41 2,708,227.41 2,708,227.41 22/03/2017 6 months 100 Completed
68
Constr of Islamiyya classroom blocks at Gudduba (Kukuma ward) and Tijiyo
(Tijiyo ward) in Buji constituency Loyalty Properties Buji 5,449,021.80 5,449,021.80 5,449,021.80 29/12/2016 6 weeks 100 Completed
69
Constr of Islamiyya classroom blocks at Kadira cikin gari and Adiyani in
Guri constituency Limis Brothers & Co. Guri 5,871,760.20 5,871,760.20 5,871,760.20 12/1/2017 8 weeks 100 Completed
70
Constr of Islamiyya classroom blocks at Karkarna and Yankwashi cikin gari
in Yankwashi Constituency Grantoids Yankwashi 5,388,504.54 5,388,504.54 5,388,504.54 12/1/2017 8 weeks 100 Completed
71
Constr. Of Islamiyya Classroom Blocks as Constituency Project at Aci Lafia
and Kudu in Yankwashi Constituency GRANATOIDS ENG Yankwashi 6,555,993.40 6,555,993.40 23/08/2017 8 weeks 100 Completed
72
Constr. Of Islamiyya Classroom Blocks as Constituency Project at Kan Tudu
Madaka and Amaryawa in Roni Constituency NA'AYI RESOURCE Roni 9,818,688.60 9,818,688.60 9,346,188.60 23/08/2017 8 weeks 100 Completed
73
Constr. Of Islamiyya Classroom Block as Constituency Project at Danya and
Doko in Garki Constituency MMZ GARKI CONST Garki 6,531,598.05 6,531,598.05 6,216,598.50 23/08/2017 8 weeks 100 Completed
74
Constr. Of Islamiyya Classroom Blocks as Contituency Project at Kantudu,
Bandutse, Kabori Gabas, Sha'iskawa and Fatare in Kazaure Constituency DUTSEN TAURA CONST Kazaure 19,650,342.00 19,650,342.00 17,045,458.50 23/08/2017 10 Weeks 100 Completed
75
Constr. Of Islamiyya Classroom Blocks 2017 Constituency Project Phase I
at Matarar Galadima, Gamji and Madugunari in Kiri-Kasamma Local
Government Area. ALH. UMAR BABANDOKI K/Kasamma 9,774,818.04 9,774,818.04 9,546,831.00 16/08/2017 7 Weeks 100 Completed
76
Constr. Of Islamiyya Classroom Blocks 2017 Constituency Project Phase I
at Abujan Amare, Bello Bayi Islamiyya, Garko and Malam Abare Islamiyya
in Hadejia Local Government Area. NA-BAKWAI GEN ENT LTD Hadejia 13,118,021.60 13,118,021.60 12,537,513.03 16/08/2017 7 Weeks 100 Completed
77
Constr. Of Islamiyya Classroom Blocks 2017 Constituency Project Phase I
at Sabuwar Daula, Zango and Alfa in Miga Local Government Area. A.BARDE GLOBAL CON Miga 9,833,550.03 9,833,550.03 9,360,184.05 16/08/2017 6 Weeks 100 Completed
78
Constr. Of a block of 3-Class Rooms, Constr.. Of an Admin, Block, Constr. Of
2No. 6 Seater VIP Toilets and Provision of 1No. Hand Pump at GGDSS
K/Hausa IMAM AHMAD NIG LTD K/Hausa 29,141,489.44 29,141,489.44 28,996,659.13 24/08/2017 12 Weeks 100 Completed
79
Constr. Of a block of 3-Class Rooms, Constr.. Of an Admin, Block, Constr. Of
2No. 6 Seater VIP Toilets and Provision of 1No. Hand Pump and Constr. Of a
Block of Laboratory at GGDSS Birnin Kudu SABON GARIN YAYA B/Kudu 38,086,803.23 38,086,803.23 37,874,903.28 24/08/2017 12 Weeks 100 Completed
BAL. C/F 1,045,400,358.95 1,058,807,093.19
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
BAL. B/F 1,045,400,358.95 1,058,807,093.19
80 Constr. Of Ten (10No) Blocks 6-Seater VIP Latrines at G.U.S.C Dutse NGALOMA CONST LTD Dutse 23,584,995.60 23,584,995.60 22,268,182.33 24/08/2017 12 Weeks 100 Completed
81
Supply of 660 Set of 3Seater Class Room Furniture at GDSS Roni, Supply of
110 3Seater Class Rooms Furniture at GDSS Gada, Supply of 385 Sets of 3
Seater ClassRooms Furniture at GGDSS Kazaure and Supply of 330 Sets of NAKOWA GEN ENT Various 29,894,720.05 29,894,720.05 29,894,720.05 18/08/2017 8 Weeks 100 Completed
82
Purchase of Classroom Furniture (GGUSS Kazaure, GUSS Maigatari, GDSS
Babura, GGUSS M/Madori, GDSS Garun Gabas, GDSS Bulangu, GUSS Basirka
and GGUSS Gw aram). MUTUAL INFRASTRU Various 64,471,284.66 64,471,284.66 64,471,284.66 22/08/2017 12 w eeks 100 Completed
83
Supply of 958 Sets of 3 Seater ClassRooms Furniture and Supply of 1056 3 Seaters
Class Rooms Furniture at GSS Fantai and Gss Famfo Goma, Hadejia. FURNI ELECT GLOBAL VEN Hadejia 39,977,900.00 39,977,900.00 39,977,900.00 24/08/2017 8 w eeks 100 Completed
84
Procurement of Assorted Biology Laboratory Equipment at 8No. Centre of
Ex ecellence(GGUSS Kazaure, GUSS Maigatari, GDSS Babura, GGUSS M/Madori,
GDSS Garun Gabas, GDSS Bulangu, GUSS Basirka and GGUSS Gw aram) A.A MAIKATAKO GEN ENT Various 34,903,627.50 34,903,627.50 34,903,627.50 18/08/2017 16 w eeks 100 Completed
85
Procurement of Assorted Chemistry Laboratory Equipment at 8No. Centres of
Ex ecellence (GGUSS Kazaure, GUSS Maigatari, GDSS Babura, GGUSS M/Madori,
GDSS Garun Gabas, GDSS Bulangu, GUSS Basirka and GGUSS Gw aram) A.A MAIKATAKO GEN ENT Various 34,197,019.50 34,197,019.50 34,197,019.50 18/08/2017 8 Weeks 100 Completed
86
Procurement of Assoorted Phy sics Laboratory Equipments at 8No. Centres of
Ex cellence (GGUSS Kazaure, GUSS Maigatari, GDSS Babura, GGUSS M/Madori,
GDSS Garun Gabas, GDSS Bulangu, GUSS Basirka and GGUSS Gw aram) MUGIN INVT LTD Various 37,043,435.93 37,043,435.93 37,043,435.92 21/08/2017 8 Weeks 100 Completed
87
Supply of 539 Sets of 3-seater classroooms furniture at GDSS Gumel, Supply of 724
3-Seater Classrooms Furniture at GSS Maigatari, Supply of 539 Sets of 3-seater
Classrooms furniture at GGDSS Gumel and Supply of 261 Sets of 3-Seater
Classroom Furniture at GDSS Maigatari ABDULCOM PROJECT Various 40,950,550.00 40,950,550.00 40,950,550.00 24/08/2017 8 Weeks 100 Completed
88
Constr. Of Islamiyya classroom blocks as Constituency project at
U/marayu, Fulanin Kangire and Wurno in Birnin Kudu constituency. Nushe Resources B/Kudu 9,819,816.00 9,819,816.00 9,504,815.98 5/12/2017 8 weeks 100 Completed
89
Supply of 1.750No. 3-Seater Students Desks and benches to selected
Arabic Senior Secondry Schools Abdulcom Proj. & Service Across the state 34,912,500.00 34,912,500.00 34,912,500.00 20/12/2017 12 weeks 100 Completed
90
Supply of 1.242Nos. 3-Seater Students Desks and benches to some newly
established Senior Secondry Schools Furni-Elect Global Across the state 24,777,900.00 24,777,900.00 24,777,900.00 20/12/2017 12 weeks 100 Completed
91
Constr of islamiyya classroom block as constituency project at Unguwar
Tama in Gwiwa Constituency Manhaf Global Nig. Ltd. Gwiwa 3,268,467.76 3,268,467.76 3,110,967.30 23/08/2017 8 weeks 100 Completed
92
Constr of islamiyya classroom block as constituency project at Cikin Gari
Arewa and Garu Cikin gari in Babura Constituency Mufabamex Concept Babura 5,551,958.00 5,551,958.00 5,551,958.00 29/12/2016 8 weeks 100 Completed
93
Constr. Of Islamiyya Classroom Blocks as Contituency Project at Yamidi in
Auyo Constituency A.U.A & SONS NIG LTD Auyo 3,280,666.90 3,280,666.90 3,134,726.70 23/08/2017 4 Weeks 100 Completed
94
Constr. Of Islamiyya Classroom Blocks as Contituency Project at Gurfai and
Babura Tsallake in Babura Constituency MUFABAMEX CONCEPT LTD Babura 6,490,859.80 6,490,859.80 6,198,859.80 23/08/2017 5 Weeks 100 Completed
Total 1,438,526,060.65 1,451,932,794.89
Government House
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT AMOUNT REVISED VA LUE OF C OM M EN C EM EN TC OM P L. STATUS REMARKS
(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
1
Purchase of 2no. 2015 Toyota Camry, 1no. 2013 Toyota
Prado and 1no. 2015 Toyota Landcruiser Al -hamsad Investment Dutse 85,847,520.00 85,847,520.00 85,847,520.00 13/04/2017 3 weeks 100 Completed
2 Purchase of 7no. Brandnew Toyota Camry (2015 model) Al -hamsad Investment Dutse 92,400,000.00 92,400,000.00 92,400,000.00 2/2/2017 3 weeks 100 Completed
3 Purchase of Fairly Used Armoured Lexus Jeep LX570 2013 Model. ZAAN MULTI TRADE Dutse 38,500,000.00 38,500,000.00 38,500,000.00 9/8/2017 2 weeks 100 Completed
4 Supply of 1no. Toyota Parado Al -hamsad Investment Dutse 31,900,000.00 31,900,000.00 31,900,000.00 10/10/2017 1 weeks 100 Completed
Total 248,647,520.00 248,647,520.00
Min. of Land & Housing
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
AMOUNT (N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
TOTAL - -
Min. of Commerce
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT AMOUNT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
1
Consultancy services for the Cons. Of Culvert
and Drainages at Hadejia, Kumsa and Furji
Market Yaqin Associate Ltd state 20,893,292.67 20,893,292.67 20,893,111.02 26/6/2014 6month 100 Completed
2
Renov/rehab of Maigatari Export Process ing
Zone (EPZ) Alpha Zeta Tech. Services Maigatari 21,482,985.00 21,482,985.00 21,482,557.61 24/11/2017 3 weeks 100 Completed
Total 42,376,277.67 42,376,277.67
Dir. Of Econ. Emp.
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
1
Renovation work at National Youth Development Centre
Gwaram LGA FAR Tech Fabrication Gwaram 8,566,587.15 8,566,587.15 8,473,518.67 27/01/2017 8 weeks 100 Completed
Total 8,566,587.15 8,566,587.15
Dutse Capital Development Agency
P OST C ON T R A C T P R OJEC T EVA LUA T ION
S/ N P R OJEC T EXEC UT OR LOC A T ION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS
AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %
1
Consultant on the superv ision for the Constr. of New Airport (project
Dutse (phase 1B) El-Mansur Atelier Co. Dutse 457,296,050.38 457,296,050.38 457,274,905.85 17/6/2013 12 months 100 Completed
2 Renov ation of His Ex cellency , the Deputy Gov ernor's Official Residence Edil Belmote Eng. Dutse 58,955,481.16 71,431,449.86 71,032,258.80 12/31/2015 12 w eeks 100 Completed
3 Constr. of 20no. Ultra Modern Market Stalls w ithin Dutse Metropolitain Sahal-Bin Nig. Ltd. Dutse 16,515,760.00 16,515,760.00 9,991,548.00 4/27/2016 12 w eeks 100 Completed
4
Procurement and Fixing of Furniture to Deputy Governor's
Residential complex, Dutse Connaught Internation Serv. Dutse 74,442,690.00 74,442,690.00 74,442,690.00 4/1/2017 4 weeks 100 Completed
TOTAL 607,209,981.54 619,685,950.24
Cabinet Office
POST CONTRACT PROJECT EVALUATION
S/ N P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T R EVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS
A M OUN T (N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %
1 Consultancy for the Upgrading of Gov ernor's Lodge Abuja Design+ Consultant LTD Abuja 4,182,711.59 4,182,711.59 3,395,808.47 22/10/12 4 w eeks 100 Completed
2
Constr. of Daily pray er mosque at Kaigari, Safa Babba and Jamaru
Kuka in Auy o Constituency A.A. ALJAZEERA AGRO LTD Auy o 4,648,363.00 4,648,363.00 4,512,974.60 12/15/2016 6 w eeks 100 Completed
3
Constr. of Daily pray er mosque at Fulanin G/Ganta, Kaga Fulani and
Hammadi in Babura Constituency M UFABAM EX CONCEPT LTD Babura 4,767,336.90 4,767,336.90 4,628,482.43 12/15/2016 6 w eeks 100 Completed
4
Constr. of Daily pray er mosque at Aja (Doraw a w ard), Adugul and
Kany a (Kany a w ard) in Kany a Constituency Babura Local Gov t.
Area Deetech NIG. LTD Babura 4,762,601.55 4,762,601.55 4,623,885.00 12/15/2016 6 w eeks 100 Completed
5
Constr. of Daily pray er mosque at Gallu, Tsamiy ar Ilu, and Walaw al
in Kazaure Constituency Deetech NIG. LTD Kazaure 4,762,601.55 4,762,601.55 4,623,885.00 12/15/2016 6 w eeks 100 Completed
6
Constr. of Daily pray er mosque at Birnin Kudu Gari, Gangare and
Ukadale in Birnin Kudu Constituency NUSHE BUSINESS REC. LTD B/Kudu 4,515,216.00 4,515,216.00 4,405,334.85 12/15/2016 6 w eeks 100 Completed
7
Constr. of Daily pray er mosque at B/Gida Nahuce, Sara and Budinga
in Gw aram Constituency NUSHE BUSINESS REC. LTD Gw aram 4,707,981.00 4,707,981.00 4,593,406.39 12/15/2016 6 w eeks 100 Completed
8
Constr. of Daily pray er mosque at Kumdum, Rabadi and Galambi in
Fagam Constituency Gw aram LGA RAM ADAN CONSTR. LTD Gw aram 4,682,437.00 4,682,437.00 3,030,704.14 12/15/2016 6 w eeks 100 Completed
9
Constr. of Daily pray er mosque at Z/Kay a, Tsubut and Guntai in
Gw iw a Constituency ISA HALILU NIG. LTD. Gw iw a 4,749,281.07 4,749,281.07 4,611,265.97 12/15/2016 6 w eeks 100 Completed
10
Constr. of Daily pray er mosque at Garin Urema and Hadejia Cikin
Gari in Hadejia Constituency A.A. M AIKATAKO GEN. ENTP. Hadejia 4,335,919.41 4,335,919.41 4,209,630.48 12/15/2016 6 w eeks 100 Completed
11
Constr. of Daily pray er mosque at Kiri-Kasamma Gari, Tasheguw a
and Matafari in Kiri-Kasamma Constituency ALH. UM ARU BABANDOKI K/Kasamma 4,749,185.55 4,749,185.55 4,749,185.56 12/15/2016 6 w eeks 100 Completed
12
Constr. of Daily pray er mosque at Auroi, Kocoro and Dadada in
Bulangu Constituency K/Hausa LGA KAWU NIG. LTD. K/Hausa 4,722,180.75 4,722,180.75 4,584,641.50 12/15/2016 6 w eeks 100 Completed
13
Constr. of Daily pray er mosque at Kachakama, Maw adaci and Bura
Musa in Malam Madori Constituency AZZIDS NIG. ENTP. Malam Madori 4,937,867.34 4,937,867.34 4,794,045.95 12/15/2016 6 w eeks 100 Completed
14
Constr. of Daily pray er mosque at Katirje (L/kudu), K/Ug. Labiru
(Buji) and Azanaba in Buji Constituency LOYALTY PROPERTIES Buji 4,728,500.19 4,728,500.19 4,590,776.92 15/12/2016 6 w eeks 100 Completed
15
Constr. of Daily pray er mosque at g/Duka, Jarkuka and M/kara
Gadaw a in Jahun Constituency LOYALTY PROPERTIES Jahun 4,728,500.25 4,728,500.25 4,590,776.92 15/12/2016 6 w eeks 100 Completed
BAL. C/F 69,980,683.15 69,980,683.15
Min. of Information
P OST C ON T R A C T P R OJEC T EVA LUA T ION
S/ N P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T A M OUN T R EVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS
(N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %
1 Upgrade of Dutse Stadium Lodgiani Nigeria Ltd. Dutse 351,853,465.25 524,794,441.42 524,815,740.24 25/06/2012 6 months 100 Completed
2 Consultancy Serv ices for TV station project (equipment) Royal Telecom Ltd. Dutse 92,313,015.08 92,313,015.08 92,313,015.00 12/12/2012 7 months 100 Completed
3 Upgrading of kazaure Stadium H & M Nig. Ltd. Kazaure 391,139,151.00 519,645,968.67 507,101,206.66 6/21/2012 6 months 100 Completed
Total 835,305,631.33 1,136,753,425.17
Min. of Agriculture
P OST C ON T R A C T P R OJEC T EVA LUA T ION
S/ N P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T A M OUN T REVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS
(N ) CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %
1 Consultancy on 50No. Windmills Abasam Nig. Ltd. in the state 15,000,000.00 15,000,000.00 15,000,000.00 Nov . 2012 7 months 100 Completed
2
Prov ision of additional 30no. Wind pow ered Liv estock Watering
facilities at 30no. Grazing Reserv es
Ex cel Standards Nig.
Ltd. State 350,487,264.60 350,487,264.60 350,421,666.48 19/5/2014 6 months 100 Completed
TOTAL 365,487,264.60 365,487,264.60
Min. of Women Affairs
POST CONTRACT PROJECT EVALUATION
S/ N P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T R EVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS
A M OUN T (N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %
1 Purchase of Grains (Maize) (1000 mts) Juraj Gen. Entp. State 145,480,000.00 145,480,000.00 3/3/2017 4 weeks 100 Completed
2 Purchase of Grains (Maize) (650 MTS) Juraj Gen. Entp. State 99,162,000.00 99,162,000.00 31/5/2017 4 weeks 100 Completed
3 Renov. of Dutse Women Multi-purpose centre Umar Aliyu & Sons Ltd. Dutse 11,428,016.84 11,428,016.84 11,326,476.18 19/10/2017 8 weeks 100 Completed
Total 256,070,016.84 256,070,016.84
Head of Service
S/ N . P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T R EVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS
A M OUN T C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %
1
Constr. of Guest Facilities at Manpow er
Dev elopment Institute, Dutse Babandoki Gen. Entp. Dutse 650,250,473.88 659,803,983.88 659,115,599.88 12/10/2014 18 months 100 Completed
2
Commissioning/Engagement as Consultant for
the Superv ision of the Constr. of Guest
Facilities at Manpow er Dev elopment Institute,
Dutse Design Plus + Dutse 35,907,501.07 35,907,501.07 35,907,501.07 12/10/2014 18 months 100 Completed
3
Supply and Installation of Furniture and
Electronics for the New Guest's Facilities
at MDI Dutse Babandoki Gen. Entp. Dutse ############## 246,220,380.00 246,093,960.00 21/6/2017 12 weeks 100 Completed
,
TOTAL 932,378,354.95 941,931,864.95
Science & Tech.
P OST C ON T R A C T P R OJEC T EVA LUA T ION
S/ N . P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T R EVISED VA LUE OF C OM M EN C EM EN TC OM P L.ST A T US R EM A R KS
A M OUN T (N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %
Total - -
State Universal Basic Education Board
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENTC OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
1
Constr of Dining Hall at bamaina
Academy BM Investment Ltd. B/kudu 14,754,828.72 14,754,828.72 13,655,465.79 15/4/2015 16 weeks 100 Completed
Total 14,754,828.72 14,754,828.72
Jigawa State Independent Electoral Commission
POST CONTRACT PROJECT EVALUATION
S/ N P R OJEC T EXEC UT OR LOC A T IONC ON T R A C T A M OUN T R EVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS
(N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %
Total - -
Min. of Justice
POST CONTRACT PROJECT EVALUATION
S/ N P R OJEC T EXEC UT OR LOC A T IONC ON T R A C T A M OUN T R EVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS
(N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %
Total - -
GH
POST CONTRACT PROJECT EVALUATION
S/ N P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T R EVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS
A M OUN T (N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %
Total - -
Agency for Nomadic Edu.
P OST C ON T R A C T P R OJEC T EVA LUA T ION
S/ N P R OJEC T EXEC UT OR LOC A T IONC ON T R A C T A M OUN T REVISED VA LUE OF C OM M EN C EM EN TC OM P L.ST A T US R EM A R KS
(N ) CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %
Total - -
Jigawa College of Edu. & Legal Studies
P OST C ON T R A C T P R OJEC T EVA LUA T ION
S/ N . P R OJEC T EXEC UT OR LOC A T ION CONTRACT REVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS
AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %
Total - -
Bilyaminu Usman Poly Hadejia
P OST C ON T R A C T P R OJEC T EVA LUA T ION
S/ N P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T A M OUN T REVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS
(N ) CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %
1
Procurement of Facilities, Equipment, Office Funiture
and Rehab. of Proposed Business Admin. Block for
NBTE Resources inspection at Biny aminu Usman
Poly technic, Hadejia. DAD A.E. Nig. Limited Hadejia 55,803,000.00 55,803,000.00 54,799,849.96 30/12/2016 24 w eeks 100 Completed
2
Procurement of 1no. 30kva sound proof
generator Al-kasam janna Nig. Ltd. Hadejia 5,250,000.00 5,250,000.00 5,250,000.00 15/5/2017 2 weeks 100 Completed
3Prov ision of Wi-fi & VSAT Galax y Information Ltd. Hadejia 1,723,885.00 1,723,885.00 1,723,885.00 25/8/17 4 w eeks 100 Completed
4
Renov of Hostel blocks J&H and 2no. Toilet blocks AMIM Constr. Ltd. Hadejia 7,758,515.72 7,758,515.72 7,389,032.95 18/12/2017 8 w eeks 100
Completed
5Procurement of Library blocks Muhal Global Concept Hadejia 15,107,100.00 15,107,100.00 15,107,100.00 25/8/2017 8 w eeks 100
Completed
6Supply and Installation of Laboratory furnitures Muhal Global Concept Hadejia 13,768,125.00 13,768,125.00 13,768,125.00 24/07/2017 8 w eeks 100
Completed
TOTAL 99,410,625.72 99,410,625.72
Min. of Environment
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
1 Constr. of Drainage at Limaw a tow n, Dutse Deetech Nig. Ltd. Dutse 13,745,000.00 13,745,000.00 13,721,289.59 8/10/2017 10 w eeks 100 Completed
2 Constr. of Drainage at Makara Duhu in Hadejia Tasiu Model Inv est. Ltd. Hadejia 17,083,086.46 17,083,086.46 16,269,606.15 8/9/2017 12 w eeks
100
Completed
Total 30,828,086.46 30,828,086.46
Jigawa State College of Edu. Hadejia
P OST C ON T R A C T P R OJEC T EVA LUA T ION
S/ N . P R OJEC T EXEC UT OR LOC A T ION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K (N ) D A T E P ER IOD IN %
1
Supply of (600 pieces) of Mattress Mabudi Constr. Co. Ltd. Gumel 8,505,000.00 8,505,000.00 8,505,000.00 21/12/2017 1 w eek 100 Completed
2
Constr of w all fence Mabudi Constr. Co. Ltd. Gumel 11,962,308.07 11,962,308.07 11,392,673.60 27/11/2017 4 w eeks 100 Completed
Total 20,467,308.07 20,467,308.07
Jigawa State Institute of Info. Tech. Kazaure
P OST C ON T R A C T P R OJEC T EVA LUA T ION
S/ N . P R OJEC T EXEC UT OR LOC A T ION CONTRACT REVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS
AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %
TOTAL - -
SECTION ( F )
ON-GOING PROJECTS
JANUARY TO DECEMBER, 2017
Min of Health
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
1 Constr. of New Gen. Hospital at B/Kudu Datum Constr. Limited B/kudu 1,498,970,413.02 1,498,970,413.02 777,191,933.28 19/5/2014 8 months 52 On-going
2 Cleaning Serv ices at School of Nursing B/kudu Basic Four Ltd. B/kudu 16,140,000.00 16,140,000.00 12,105,000.00 1/1/2014 56 w eeks 75 On-going
3
Commissioning/engagement as consultants for the
superv ision of construction of new general hospital at
Birnin kudu Design Plus B/Kudu 74,010,950.99 74,010,950.99 56,302,674.54 27/5/2014 10 month 72 On-going
4 Constr. Of BHC of Dannani in Gagarawa Dangata Invest. Ltd. Gagarawa 19,500,000.00 19,500,000.00 18,584,611.50 5/6/2017 16 weeks 95 On-going
5 Prov ision of Security Serv ices at College of Nursing and Kings Guard Nig. Ltd Birnin Kudu 7,399,080.00 7,399,080.00 2/1/2017 12month On-going
6
Renov ation of X-Ray Block and Others at Hadejia
General Hospital
Spring Global Serv ice Hadejia 10,771,117.36 10,771,117.36 4,502,571.15 4/2/2014 2month 43 Terminated
7
Conversion of Catering Rest House to School of
Nursing, Hadejia Business Gold Ltd. Hadejia 67,757,628.62 67,757,628.62 38,524,250.94 3/22/2016 3 months 57 Rev oked
8
Renovation/Improvement works at Babura
General Hospital Babandoki Gen. Entp. Babura 86,705,087.43 86,705,087.43 71,349,004.60 9/9/2016 20 weeks 78 On-going
9
General Renov ation/Improv ement w orks at Dutse
General Hospital Ummu Khulsum Global Dutse 56,668,862.45 56,668,862.45 34,049,192.92 30/12/2016 16 w eeks 60 On-going
10
General Renov ation/Improv ement w orks at Jahun
General Hospital Yanduna Ventures Jahun 62,314,663.17 75,593,349.17
42,115,621.08
30/12/2016 16 w eeks
65
On-going
11
General Renov . /Improv ement w orks at Fagam Primary
Health Care Ngaloma Const. Co. Ltd. Gw aram 64,869,057.07 71,417,939.66 51,621,542.48 30/12/2016 12 w eeks 69 On-going
12
General Renov . /Improv ement w orks at Taura Primary
Health Care Babandoki Gen. Entp. Ltd. Taura 66,748,706.88 75,219,035.87 62,827,942.80 30/12/2016 12 w eeks 66 On-going
13
Supply of Furniture to New School of Nursing,
Hadejia Wajabs Building & Constr. Hadejia 47,076,618.00 47,076,618.00 40,848,696.00 7/2/2017 12 weeks 87 On-going
14
Construction of prototype basic health clinic (BHC)
across the state as constituency project at Garin
Chiroma in Gagarawa consitituency. HARUNA LADAN INVEST. Gagarawa 19,285,412.31 19,285,412.31 18,367,059.34 30/5/2017 16 weeks 95 On-going
15
Construction of prototype basic health clinic (BHC)
across the state as constituency project at
Auyakayi in Auyo consitituency. BABAN DOKI GEN. ENTP. Auyo 19,576,947.50 19,576,947.50 18,304,317.15 30/5/2017 16 weeks 95 On-going
16
Construction of prototype basic health clinic (BHC)
across the state as constituency project at
Gangara in Gumel consitituency. POLYSPEC NIG. LTD. Gumel 19,100,000.00 19,100,000.00 18,190,476.19 30/5/2017 16 weeks 95 On-going
Balance C/F 2,136,894,544.80 2,165,192,442.38
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
Balance B/F 2,136,894,544.80 2,165,192,442.38
17
Construction of prototype basic health clinic (BHC)
across the state as constituency project at
Maraganta in Gwiwa consitituency. NGALOMA CONSTR. CO. Gwiwa 19,253,751.00 19,253,751.00 18,378,580.50 30/5/2017 16 weeks 95 On-going
18
Constr. Of Prototype basic Health Clinic (BHC)
Across the State as Constituency Project at Buduru
in Garki Local Government Area. (change of site) A.H.I.K ENT LTD Garki 19,304,132.10 19,304,132.10 18,426,694.65 21/08/2017 16 Weeks 95 On-going
19
Construction of prototype basic health clinic (BHC)
across the state as constituency project at
Ba'auzini in Kazaure consitituency. BABAN DOKI GEN. ENTP. Kazaure 19,276,132.05 19,276,132.05 18,358,221.00 30/5/2017 16 weeks 95 On-going
20
Construction of prototype basic health clinic (BHC)
across the state as constituency project at Fake in
Kiyawa consitituency. BABAN DOKI GEN. ENTP. Kiyawa 19,576,947.50 19,576,947.50 18,687,086.25 30/5/2017 16 weeks 95 On-going
21
Construction of prototype basic health clinic (BHC)
across the state as constituency project at
Dansure in Roni consitituency. DANGATA MEMORIAL Roni 19,335,533.23 19,335,533.23 18,456,645.36 30/5/2017 16 weeks 95 On-going
22
Construction of prototype basic health clinic (BHC)
across the state as constituency project at Taka
tsaba in Suletankarkar consitituency. POLYSPEC NIG. LTD. S/Tankarkar 19,675,403.00 19,675,403.00 18,781,066.50 30/5/2017 16 weeks 95 On-going
23
Construction of prototype basic health clinic (BHC)
across the state as constituency project at
Dankari in Yankwashi consitituency. BABAN DOKI GEN. ENTP. Yankwashi 19,490,741.50 19,490,741.50 18,604,798.80 30/5/2017 16 weeks 95 On-going
24
Construction of prototype basic health clinic (BHC)
across the state as constituency project at
Baderin gabas in Hadejia consitituency. NGALOMA CONSTR. CO. Hadejia 19,035,479.45 19,035,479.45 18,129,028.05 30/5/2017 16 weeks 95 On-going
25
Construction of prototype basic health clinic (BHC)
across the state as constituency project at Giginya
in Babura consitituency. POLYSPEC NIG. LTD. Babura 19,312,904.52 19,312,904.52 18,349,359.00 30/5/2017 16 weeks 95 On-going
Balance C/F 2,311,155,569.15 2,339,453,466.73
1b
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
Balance B/F 2,311,155,569.15 2,339,453,466.73
26
Constr. Of Prototype basic Health Clinic (BHC)
Across the State as Constituency Project at
Gasakoli in Babura Local Government Area.
(change of site) BABANDOKI GEN ENT Babura 19,225,138.00 19,225,138.00 18,376,851.30 17/08/2017 16 Weeks 95 On-going
27
Construction of prototype basic health clinic (BHC)
across the state as constituency project at Sabon
garin yaya in Taura consitituency. A.H.I.K. ENTP. LTD. Taura 19,394,831.50 19,394,831.50 18,513,248.25 30/5/2017 16 weeks 95 On-going
28
Construction of prototype basic health clinic (BHC)
across the state as constituency project at Surko
in Birnin kudu consitituency. A.H.I.K. ENTP. LTD. B/Kudu 19,575,646.20 19,575,646.20 18,628,571.43 30/5/2017 16 weeks 95 On-going
29
Construction of prototype basic health clinic (BHC)
across the state as constituency project at Ruba in
Kafin hausa consitituency. S.U.B. GEN VENTURES K/Hausa 19,523,847.00 19,523,847.00 18,584,611.50 30/5/2017 16 weeks 95 On-going
30
Construction of prototype basic health clinic (BHC)
across the state as constituency project at Jarmari
in Kirikasamma consitituency. A.A MAIKATAKO K/Kassamma 19,723,317.08 19,723,317.08 18,782,851.50 30/5/2017 16 weeks 95 On-going
31
Construction of prototype basic health clinic (BHC)
across the state as constituency project at Dawa
in Guri consitituency. S.U.B. GEN VENTURES Guri 19,253,751.00 19,253,751.00 18,376,581.30 30/5/2017 16 weeks 95 On-going
32
Construction of prototype basic health clinic (BHC)
across the state as constituency project at Karwai
in Ringim consitituency. IMAM AHMAD NIG Ringim 19,666,797.24 19,666,797.24 18,595,170.85 30/5/2017 16 weeks 95 On-going
33
Construction of prototype basic health clinic (BHC)
across the state as constituency project at Mudiga
in Miga consitituency. A.H.I.K. ENTP. LTD. Miga 19,329,482.25 19,329,482.25 18,409,030.50 30/5/2017 16 weeks 95 On-going
Balance C/F 2,466,848,379.42 2,495,146,277.00
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
Balance B/F 2,466,848,379.42 2,495,146,277.00
34
Construction of prototype basic health clinic (BHC)
across the state as constituency project at
Dinfiduwa in Malam Madori consitituency. A.G.GLOBAL GOLD M/madori 19,693,479.20 19,693,479.20 18,798,320.10 30/5/2017 16 weeks 95 On-going
35
Construction of prototype basic health clinic (BHC)
across the state as constituency project at Dan
kumbo in Maigatari consitituency. IMAM AHMAD NIG Maigatari 19,723,317.08 19,723,317.08 16,739,928.78 30/5/2017 16 weeks 81 On-going
36
Construction of prototype basic health clinic (BHC)
across the state as constituency project at
Idanduna in Jahun consitituency. IMAM AHMAD NIG Jahun 19,532,487.00 19,532,487.00 18,458,200.21 30/5/2017 16 weeks 95 On-going
37
Constr. Of New 250 Bed Specialist Hospital in
Hadejia PHILKO LIMITED Hadejia 1,593,314,294.25 1,593,314,294.25 11/8/2017 16 months 5 On-going
38
Renovation Works at New School of Nursing
Hadejia XTRAX 99 INT SERV LTD Hadejia 58,681,266.23 58,681,266.23 21,552,121.18 6/9/2017 12 weeks 37 On-going
39
General Renov./Improvement works at Roni
Primary Health Centre (PHC) Yusmatech Invest. Nig. Ltd. Roni 26,766,366.36 26,766,366.36 13,858,953.13 2/11/2017 12 Weeks 52 On-going
40
General Renov./Improvement works at Kanya
Babba Primary Health Centre (PHC) Math Global Invest. Ltd. Babura 27,609,456.17 27,609,456.17 15,110,173.95 2/11/2017 12 Weeks 55 On-going
41
General Renov./Improvement works at Kaugama
Primary Health Centre (PHC) S/garin Yaya Nig. Ltd. Kaugama 35,574,703.10 35,574,703.10 15,919,674.25 2/11/2017 12 Weeks 45 On-going
42
Supply and Installation of Solar Powered
Lightening System at Dutse Gen. Hospital SIMS Global Resources Dutse 27,835,303.13 27,835,303.13 17,105,387.25 2/11/2017 8 Weeks 61 On-going
43
Construction of Wall Fence, Gate and House at
Specialist Hospital Kazaure Ngaloma Constr Com Kazaure 57,329,839.50 57,329,839.50 21/12/2017 8 Weeks 5 On-going
44
Supply and installation of Solar Powered lightening
System in Babura General Hospital. Sims Global Resources Babura 20,984,971.88 20,984,971.88 20/12/2017 8 Weeks Just mobilized
Balance C/F 4,373,893,863.32 4,402,191,760.90
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
Balance B/F 4,373,893,863.32 4,402,191,760.90
45
Supply and installation of Solar Powered lightening
System in GumelGeneral Hospital. Sims Global Resources Gumel 30,263,168.13 30,263,168.13 20/12/2017 8 weeks Just mobilized
46
Engagment as Consultant for the supervision of the
Constr. Of New Specialist Hospital, Hadejia HAG Eng. Nig. Ltd. Hadejia 19/10/2017 16 months 5 On-going
47 Completion of wall fencing of Ringim Gen. Hospital DasoMaryam Nig. Ltd. Ringim 7,599,406.45 7,599,406.45 4,862,347.95 16/12/17 8 Weeks 64 On-going
Total 4,411,756,437.90 4,440,054,335.48
Min. of Water Resources
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
1
Rehab. of Water Supply Schemes across the state at
Hadejia Zone (Water Board) Seltrix Nig. Ltd. Hadejia 76,214,488.22 76,214,488.22 52,868,287.50 9/21/2015 12 w eeks 66 On-going
2
Rehab. of Water Supply Schemes across the state at
Gw aram Zone (Water Board) Interw orld I & E Gw aram 27,207,315.85 27,207,315.85 22,983,670.63 9/21/2015 12 w eeks 89 On-going
3 Constr. Of 40no. Hand pumps AGM & Sons Ltd. State 28,000,000.00 28,000,000.00 18,000,009.00 3/24/2014 6 months 65 On-going
4
Conversion of Motorised Diesel powered water
schemes to Solar energy powered schemes
across the state at Idanduna, Koya, Sabon gida
and Dakayyawa stations in Jahun zone (STOWA) IMAM Ahmed Nig. Ltd. Jahun 16,237,593.74 16,237,593.74 2,379,234.37 4/29/2016 12 w eeks 15 On-going
5
Conversion of Motorised Diesel powered water
schemes to Solar energy powered schemes
across the state at Kudigin, Nguwa, Likori, Musari
and Makaddari stations in Hadejia zone (STOWA) ABAT Global Inv est. Hadejia 12,877,265.61 12,877,265.61 10,498,031.25 4/29/2016 12 w eeks 82 On-going
6
Conv.of Motorised Diesel powered water schemes to
Solar powered schemes across the state at Gumel,
Maigatari and S/Tankarkar stations in Gumel zone
(Water Board) JURAJ Gen. Entp. Ltd. Gumel 16,707,009.38 16,707,009.38 11,821,687.50 5/18/2016 8 weeks 70 On-going
7 Improvement of Kazaure town Water Supply Marb Eng. & Multy Serv ices Kazaure 131,208,239.13 163,939,534.76 126,042,350.53 7/28/2016 7 weeks 73 On-going
8 Improvement of Ringim town water supply Marb Eng. & Multy Serv ices Ringim 137,576,766.21 213,146,514.63 210,012,062.11 11/23/2016 20 weeks 98 On-going
9
Constr. of Hand pumps Water Supply Schemes as
Constituency Projects at Gajigani, Gaw ajo, Kankare,
Fulanin G/Lamau And Gaban Giw a in Gagaraw a
Constituency DANM AWANKI NIG. LTD Gagaraw a 2,780,000.00 2,780,000.00 11/29/2016 8 w eeks - Just mobilized
10 Improvement of Babura town Water Supply Schemes Prestige Interg. Services Babura 119,811,906.43 221,351,161.88 218,640,250.74 29/12/2016 16 weeks 98 On-going
11 Improvement of Gumel town Water Supply Schemes M ARB Eng. & M ulty Gumel 179,054,167.87 274,990,289.75 255,796,087.26 29/12/2016 20 weeks 93 On-going
12
Constr. o f Hand Pumps Water Supply Schemes as
Constituency Pro jects at Banbare Gidan Sallau, Ka'el
village, Gumumuwa, Gizo Babba and Kabobi village in
Kazaure Constituency. M arb Eng. & M ulty Serv. Kazaure 2,769,900.00 2,769,900.00 7/3/2017 8 weeks Just mobilized
13
Constr. o f Hand Pumps Water Supply Schemes (phase
II) as Constituency pro jects at Yosaro, Dilima/Zaramba
and M ungulo in B/Kudu Constituency. A.A. A ljazeera Agro Properties B/Kudu 1,657,215.00 1,657,215.00 29/3/2017 8 weeks Just mobilized
BAL. C/F 752,101,867.44 1,057,878,288.82
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
BAL. B/F 752,101,867.44 1,057,878,288.82
14
Constsruction of Hand pumps Water supply
schemes (phase II) as constituency project at
Yola, Masanawa, Larabar Gulai, Katanga Kudu,
Dan koli and Dubal in Kiyawa Constituency. DE-MASTBO Kiyawa 3,331,430.00 3,331,430.00 29/03/2017 8 weeks Just mobilized
15
Construction of Solar Powered Water supply
schemes (Phase II) as constituency Projects at
Sabuwar Rafa (Andaza ward ) in Dutse
constituency DE-MASTBO Dutse 6,270,000.00 6,270,000.00 29/03/2017 8 weeks Just mobilized
16
Cost Variation/Fluctuation on the improvement
of Gumel Town Water supply MARB ENGR SVC LTD Gumel 33,651,870.00 33,651,870.00 6/6/2017 On-going
17
Constr. Of 4no. Hand pumps Water supply
schemes (phase II) as Constituency projects at
Kofar Gidan Liman, Bayan Gidan Sarkin Bai,
Zankuwa fulani and Sabuwar SSS in Garki
Constituency. Taqib Ventures Nig. Ltd. Garki 2,340,000.00 2,340,000.00 21/6/2017 8 weeks Just mobilized
18
Constr. Of Hand Pumps Water Supply Schemes
as Constituency Projects at Falkin Jalo
Nasarawa, Fulanin Kuka Uku, Fulanin Liman
Mado, Fulanin Gangara and Fulanin Dan'ama
Gabas in Gumel Constituency. JAG & H Int. Services Gumel 2,742,600.00 2,742,600.00 1,641,446.10 29/8/2017 8 weeks 57 On-going
19
Constr. Of Solar Powered Water Supply Schemes
(Phase I) as Constituency Project at Marye in
Birniwa Constituency ADZ GLOBAL SERV LTD Birniwa 6,968,010.00 6,968,010.00 7/8/2017 8 Weeks just mobilized
20
Constr. Of Solar Powered Water Supply Schemes
(Phase I) as Constituency Project at Baturiya and
Tarabu in Kirikasamma Constituency ADZ GLOBAL SERV LTD K/Kasamma 13,936,020.00 13,936,020.00 7/8/2017 8 Weeks just mobilized
21
Constr. Of Solar Powered Water Supply Schemes
(Phase I) as Constituency Project at Bekarya and
Gusau in Gumel Constituency JAG & H INT SERVICES Gumel 13,921,740.00 13,921,740.00 7/8/2017 8 Weeks just mobilized
22
Constr. Of Solar Powered Water Supply Schemes
(Phase I) as Constituency Project at Kabara,
Bagaware and Kandawa Bura in Maigatari
Constituency A.U SARO GLOBAL RES Maigatari 20,882,610.00 20,882,610.00 7/8/2017 8 Weeks just mobilized
23
Constr. Of Solar Powered Water Supply Schemes
(Phase I) as Constituency Project at Marma in
Kirikasamma Constituency LOYALTY PROPERTIES LTD K/Kasamma 6,943,387.00 6,943,387.00 7/8/2017 8 Weeks just mobilized
24
Constr. Of HandPump Water Supply Scheme
(Phase I-2017) as Constituency Project at
Kwarare kauye ( Yola Ward) and Rorau Fulani (
Rorau Ward) in Gwiwa Constituency THAQIB VENT NIG LTD Gwiwa 1,600,200.00 1,600,200.00 28/8/2017 8 Weeks just mobilized
BAL. C/F 864,689,734.44 1,170,466,155.82
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
BAL. B/F 864,689,734.44 1,170,466,155.82
25
Constr. Of Hand Pumps Supply Schemes (Phase I-
2017) as Constituency Project at Kofar Gabas
Gwaram, Barebari Makabarta Sabuwa,
Auyakawa Gidan Dutse Gwaram, Tambo
Gwaram and Sumangara in Gwaram
Constituency AZZIDS NIG LTD Gwaram 7,076,160.00 7,076,160.00 28/8/2017 8 Weeks just mobilized
26
Constr. Of Handpumps Water Supply Schemes
(Phase I-2017) as Constituency Project at Tsaba,
Dabi, Badage Gabas, Tagwani, Jana, Danlare,
Alhaji Kayi and Sabuwar Amaguwa in Ringim
Constituency MARB ENG & MULTI SERV Ringim 8,001,000.00 8,001,000.00 28/8/2017 8 Weeks just mobilized
27
Constr. Of Water Collection Points (Phase I-
2017) as Constituency Project at Garoro, Batali
and Majiya Bakin Hanya in Taura Constituency NUSHE BUSINESS RES Taura 2,401,717.50 2,401,717.50 28/8/2017 8 Weeks just mobilized
28
Constr. Of HandPumps Water Supply Schemes
(Phase I-2017) as Constituency Project at
Chiroma, Kupsa Sabuwa Ujiwa, Rigar Mungurum,
Tudu Birniwa and Dambin Diginsa in Birniwa
Constituency MUSFAT GEN ENV Birniwa 4,607,190.00 4,607,190.00 7/9/2017 8 Weeks just mobilized
29
Constr. Of 17NO. HandPumps Water Supply Schemes
(Phase III-2016) as Constituency Project at Tsakatai
Fulani( Budur Ward) Dakace(Doko Ward) Koguran
Sabuwa ( Doko Ward), Kofar Gidan Liman ( Garki Ward)
Bayan Gdian Sarkin Bai (Garki Ward), Zankuwa Fulani
(Garki Ward), Sabuwar Senior Secondary School (Garki
Ward), Zaidawa (Gwarzo Ward), Kurgunguma ( Gwarzo
Ward), Gidan Gone (Siyori Ward) Wailari( Jirima Ward)
Ufala Fulani (Rafin M arke Ward) Hardon Nagona
Faggen Gawo( Kore Ward) Gidan Boza (kore Ward)
Abudawa (M uku Ward), Unguwar Shage (Kanya Ward)
and Wailari (Jirima Ward) in Garki Constituency THAQIB VENT NIG LTD Garki 9,945,000.00 9,945,000.00 24/08/2017 8 Weeks just mobilized
BAL. C/F 896,720,801.94 1,202,497,223.32
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
BAL. B/F 896,720,801.94 1,202,497,223.32
30
Constr. Of HandPumps Water Supply Schemes (Phase
I-2017) as Constituency Proeject at G/ M utari A li Hardo
Amad M acce, Amanga Gari, Gidan Kwajale, Hardo
Chiroma, G/Jafan Sa'idu Hardo, Yantuba, Unguwar
Babangida D/Danra, G/M usa Shanu Hardo, Gidan
Wakili Isah Hardo M atto, Dankwabro Near M adoji,
Hardo Dambo Fulanin Babamato, Gidan Hardo Isa
Kyarra Gari in Sule-Tankarkar Constituency M ANHAF CONS NIG LTD S/tankarkar 9,435,816.00 9,435,816.00 28/08/2017 8 Weeks just mobilized
31
Upgarding and Conversion of 7No M otorized Water
Supply Schemes to Solar Powered Water Supply
Schemes at Dundubus, Kafin Gana, Danmakama,
M arma, Bulangu, Dansure and Jigawa Town. SIM S GLOBAL RESOURCE State 90,265,107.03 90,265,107.03 49,052,723.10 25/08/2017 16 weeks 54 On-going
32
Constr. Of 2no. Bore-hole and Pipeline route of Water
Supply from M atanfada pump station to (GSS) Roni in
Roni. NE Global Eng. Roni 12,400,890.80 12,400,890.80 14/9/2017 8 Weeks just mobilized
33
Constr. Of Solar Powered Water Supply Scheme
(Phase I) as Constituency Pro ject at Digawa (Danzomo
ward) in Sule T/karkar Constituency. Bulangu Drilling Services S/tankarkar 6,967,800.00 6,967,800.00 7/8/2017 8 Weeks just mobilized
34
Rehabilitation of Solar Powered Water supply
schemes across the State at Birnin kudu, Dutse,
Hadejia,Ringim, Gumel, Jahun and Kazaure zone
(Stowa) Sims Global Resources Across the state 166,689,700.28 166,689,700.28 122,858,268.75 18/12/2017 12 weeks 74 On-going
35
Construction of complete Solar Powered Water
supply scheme in Yan Maulu Town in Babura
Local Govt Area and conversion of Daba Town
Water supply scheme in Kazaure Local Govt
Area. Umar Aliyu & Sons Ltd. Kazaure 14,255,587.50 14,255,587.50 28/12/2017 8 Weeks just mobilized
36
Improvement of Taura Water supply scheme in
Taura local Govt Area Ngaloma Constr Com Taura 51,176,269.46 51,176,269.46 28/12/2017 12 weeks just mobilized
37
Construction of Solar Powered Water Supply
Schemes (PhaseI) as Constituency project at
Gargadin Giwa and Rumbiya in Birnin kudu
Constituency. Y-Tech Invst. & Agro Ltd Birnin Kudu 13,921,740.00 13,921,740.00 14/08/2017 8 Weeks just mobilized
38
Improvement of Jahun town water supply
scheme in Jahun LGA Babandoki Gen Entp. Jahun 19,822,950.00 19,822,950.00 28/12/2017 12 Weeks just mobilized
39
Improvement of Kiyawa town water supply
scheme in Kiyawa LGA Babandoki Gen Entp. Kiyawa 38,571,055.11 38,571,055.11 28/12/2017 12 Weeks just mobilized
40
Constr of Solar powered water shemes at Desina
and Layout of water supply in Dutse China Zhangho Dutse 463,368,470.36 463,368,470.36 179,652,518.32 10/10/2017 2 weeks 39 On-going
T OT A L 1,783,596,188.48 2 ,089,372,609.86
Min. of Works
P OST C ON T R A C T P R OJEC T EVA LUA T ION
S/ N . P R OJEC T EXEC UT OR LOC A T ION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS
AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %
1 Constr. of Internal Road Netw ork and Drainage at College of Agriculture YamidiAmirco Univ ersal Concept Hadejia 114,852,386.25 499,296,564.31 379,082,108.24 6/10/2011 20 w eeks 76 Stalled
2
Consultancy serv ices for the Constr. of Limaw a-Warw ade-Jidaw a-
Sakw ay a-Dutse road KAP Civ il Eng. Consultants Dutse 57,547,589.11 57,547,589.11 51,132,963.56 11/15/2012 16 months 94 On-going
3 Urban Tow ns Streetlight projects in B/kudu tow n (phase II) Stratrade Nig. Ltd. B/kudu 220,682,574.00 346,239,918.06 281,871,366.58 14/9/2012 7 months 81 On-going
4 Constr. of Limaw a-Warw ade-Jidaw a-Sakw ay a-Dutse road (33.40km) Boroni Prono & Co. Ltd. Dutse 2,968,551,896.02 2,968,551,896.02 2,611,339,802.95 2/11/2012 14 months 88 On-going
5 Reconstr. Of Asphaltic concrete ov erlay of Kijaw al-Dabi road (4.5km) Triacta Nig. Ltd. Taura 453,412,679.27 526,840,847.35 318,255,144.90 18/3/2013 3 months 70 Stalled
6 Urban Tow ns Streetlight Projects at Karkarna Tow n Stratrade Nig. LTD Yankw ashi 234,338,917.73 234,338,917.73 163,695,161.17 11/11/2013 6 Months 70 On-going
7
Commissioning as Consultant on the superv ision of the Urban Tow n
Streetlight Project at Garki, Karkarna, Bamaina and 3no. Gen. Hosp. MBS Eng. Nig. Ltd. Garki 29,431,500.00 29,431,500.00 27,371,295.00 23/4/2014 93 stalled
8
Commissioning as Consultant for the Superv ision of the Constr. of Gumel-
G/Gambo, feeder roads, M/madori-Dakido, Shafar-G/sani OPIQ Consultant LTD. Gumel 16,024,856.75 16,024,856.75 11,662,644.84 3/3/2014 6month 68 On-going
9 Constr. of feeder road at gumel-Garin Gambo in Gumel L.G.A. Omega Stars Nig. Ltd. Gumel 149,763,131.44 149,763,131.44 57,038,525.00 13/02/2014 6 months 38 On-going
10 Consulltancy serv ices for the Constr. Of Kiy ako-Zarenaw a feeder road UKM Civ il Eng. Consultant Babura 16,187,482.45 16,187,482.45 11,636,138.15 2/2/2014 8 months 65 On-going
11 Consultancy serv ices for the constr. Of T/kance-jamus feeder road UKM Civ il Eng. Consultant Babura 21,657,808.87 21,657,808.87 - 2/8/2014 8 Months 60 On-going
12
Commisioning as consultant on the superv ision of the construction of 6No.
New feeder road projects across the state OPIQ Consultant Ringim 22,400,354.68 22,600,354.68 21,242,736.09 28/5/2014 8 months 95 On-going
13 Consultancy Superv ision for the Constr. of Gw iw a tow nship roads (4.0km) Sadiq Eng. Serv ices Gw iw a 34,489,165.99 34,489,165.99 31,495,251.31 12/17/2012 6 months 95 Stalled
14
Commissioning as consultant for the superv ision of Kazaure urban centre
(15KM) Wuro Associate Kazaure 92,141,988.97 92,141,988.97 46,958,833.21 5/9/2013 8 months 50 On-going
15 Construction of Tow nship at kaugama Urban Centre (6.30KM) Rocad Contr. LTD Kaugama 940,127,208.47 940,127,208.47 263,578,988.93 13/12/2013 8 Months 28 Rev oked
16 Constr. of Tow nship Roads at Hadejia Urban Centre (12.80KM) Paache Const. Nig. LTD Hadejia 2,507,773,876.62 2,685,622,244.94 928,449,154.66 12/31/2013 12 months 35 On-going
17 Constr. of Tow nship Roads at Maigatari Urban Centre (6.95KM) H&M Nig. LTD Maigatari 1,037,700,121.50 1,037,700,121.50 660,531,165.00 17/12/2013 8 Months 63 On-going
18 Constr. of Tow nship Roads at Guri Urban Centre (6.15KM) SKY Tech.& Contr.LTD Guri 1,362,774,826.33 1,362,774,826.33 627,899,030.68 17/12/2013 8 Months 46 On-going
19
Commissioning as Consultant on the Superv ision of the Constr. of Maigatari
Tow nship Road (6.95KM) Sadiq Eng Ser. LTD Maigatari 64,472,315.43 64,472,315.43 57,300,722.05 19/12/2013 8 Months 89 On-going
20
Commissioning as Consultant on the Superv ision of the Constr. of M/Madori
tow nship Road (6.40KM) U.K.M Civ il Eng. LTD M/madori 59,544,758.06 59,544,758.06 31,791,306.24 12/31/2013 8 Months 52 On-going
21
Commissioning as Consultant on the Constr. Of Roni tow nship roads
(5.00KM) EMACS Eng. Consultants Roni 61,195,703.35 61,195,703.35 37,360,484.41 12/31/2013 8 Months 61 On-going
Balance C/F 10,465,071,141.29 11,226,549,199.81
P OST C ON T R A C T P R OJEC T EVA LUA T ION
S/ N . P R OJEC T EXEC UT OR LOC A T ION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS
AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %
Balance B/F 10,465,071,141.29 11,226,549,199.81
22 Commissioning as Consultant for the Constr. of Hadejia Tow nship roads Global Ecological Hadejia 101,482,637.11 101,482,637.11 73,140,829.65 12/31/2013 16 months 72 On-going
23
Commissioning as Consultant for the Constr. of Sule Tankarkar Tow nship
roads Thamar Eng. Ltd. S/tankarkar 64,638,503.00 64,638,503.00 45,203,717.27 13/02/2014 12 months 69 On-going
24 Commissioning as Consultant for the Constr. of Kaugama Tow nship roads Interactiv e Consultants Kaugama 66,347,751.06 66,347,751.06 38,946,478.35 12/31/2013 12 months 58 Stalled
25 Commissioning as Consultant for the Constr. of Guri Tow nship roads Madapad Eng. Ltd. Guri 66,500,604.95 66,500,604.95 39,738,362.77 12/3/2013 12 months 32 On-going
26
Fabrication and Erection of roads directional signs (Gantry ) and street
naming w ithin DutseMunicipality Durability Eng. Serv ices Dutse 90,081,840.00 90,081,840.00 77,618,236.51 18/3/2014 12 w eeks 87 Stalled
27 Construction of Gw iw a tow nship roads (4.0km) H & M Nig. Ltd. Gw iw a 509,414,865.75 509,414,865.75 412,393,839.50 29/11/2012 6 months 88 Stalled
28 Re-Constr. of Sule Tankarkar Tow nship road (5.16km) Afdin Constr. Co. Ltd. S/tankarkar 727,649,360.56 727,649,360.56 551,343,659.37 4/4/2016 8 months 75 On-going
29 Re-Constr. of Roni Tow nship road (5.00km) Alren Constr. Co. Ltd. Roni 645,608,565.02 645,608,565.02 454,530,055.71 4/4/2016 8 months 70 On-going
30 Re-Constr. of Kazaure Tow nship road (14.643km) Soject Nig. Ltd. Kazaure 2,090,736,236.34 2,090,736,236.34 364,472,396.40 4/4/2016 8 months 17 On-going
31 Re-Constr. of M/madori Tow nship road (6.41km) Triacta Nig. Ltd. M/madori 854,197,382.18 854,197,382.18 4/4/2016 8 months 15 On-going
32
Supply and Installation of 150 units of Standalone Solar streetlight poles w ith
Accessories at Gujungu tow n Marb Eng. & Multy Serv ices Taura 68,307,366.49 68,307,366.49 58,905,653.63 7/29/2016 2 w eeks 86 On-going
33
Constr. of Kila-Budinga-Rambazau-Tsangarw a-Nahuci-Isaw a-Maruta-Jikas-
Zandam Nagogo road (48km) Gerawa Global Eng. Ltd. Gw aram 4,726,302,328.50 4,726,302,328.50 3,779,804,935.20 28/12/2016 19 months 80 On-going
34 Rehab. of Kw anar Dundu-Bulangu road (44km) Alren Constr. Co. Ltd. K/Hausa 3,317,040,538.87 4,452,366,925.12 2,591,928,504.48 28/12/2016 14 months 58 On-going
35 Constr. of Dolen Kw ana-Batu-Kuka Inkiw a-Kupsa feeder road (32.6km) SDY Constr. Co. Ltd. Birniw a 579,242,475.00 579,242,475.00 479,474,038.58 28/12/2016 18 months 83 On-going
36
Constr. of Jigaw ar Dan Ali-Maitsamiy a-S/tankarkar-Dangw anki-Dankumbo
Feeder road w ith Sur from Dankumbo to Matsatsagi (45km) H & M Nig. Ltd. S/tankarkar 639,156,955.50 639,156,955.50 309,172,106.25 28/12/2016 9 months 48 On-going
37
Constr. of Majingini-Maimazari-Dantuw o -Hannun Giw a-Dankumbo feeder
road (11.5km) H & M Nig. Ltd. S/tankarkar 188,786,408.33 188,786,408.33 119,391,221.25 28/12/2016 6 months 63 On-going
38 Constr. of Shuw arin-Wurma-Abay a-Chamo-Isari feeder road (28.9km) Ganan Constr. Co. Ltd. Dutse 379,249,085.25 379,249,085.25 321,198,286.00 28/12/2016 12 months 85 On-going
39 Constr. of Garki-Fagen Gaw o-Kore feeder road (30.8km) Ganan Constr. Co. Ltd. Garki 410,031,381.00 410,031,381.00 231,792,907.50 28/12/2016 14 months 56 On-going
40 Constr. of Kudai-Ruru-Dantaw uy a-Sakw ay a feeder road (15km) NHD Interbiz Pro jects Dutse 170,704,264.51 170,704,264.51 78,888,609.55 28/12/2016 9 months 45 On-going
Balance C/F 26,160,549,690.71 28,057,354,135.48
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
BAL. B/F 36,536,645,095.39 38,433,449,540.16
56
Commissioning as Consultant on the Supervision of the
Construction of Jahun Township Roads (Phase II). HIMMA TECH LTD Jahun 16,450,774.46 16,450,774.46 7,731,864.00 19/06/2017 16 weeks 47 On-going
57
Commissioning as consultanat for the supervision of the Constr of
Dolen Kwana-Batu- Kuka Inkiwa- Kupsa Feeder Road (32.6Km) and
Construction of Majingini- Maimazari- dantuwo- Hannun Giwa-
DanKumbo Feeder Road (11.5Km). EMACS ENG CONSULT State 13,440,505.46 13,440,505.46 5,068,371.65 19/07/2017 12 months 38 On-going
58
Construction of Reinforced Concrete Block line Drains and Culvert
at Aujara Bakin Kasuwa and Tsigi (1650m). Alren Constr. Co. Ltd. Jahun 63,238,372.91 63,238,372.91 22/12/2017 4 Weeks Just mobilized
59 Rehabilitation and upgrading of Aujara access road (1.65KM). Retercha Co. Ltd. Jahun 96,860,399.34 96,860,399.34 22/12/2017 6 weeks Just mobilized
60
Supply and installation s of 150 Units Integrated stand alone Solar
Powered Streetlight at Aujara in Jahun Local Govt Area Sims Nig. Ltd. Jahun 95,192,680.94 95,192,680.94 14/12/2017 12 weeks Just mobilized
61 Constr. of Takur -Jaudi feeder road (4.5km) A. Y.A. Logistics Ltd Dutse 78,896,311.20 78,896,311.20 26,474,700.00 19/10/2017 12 weeks 33 On-going
62
Constr. of Limawa-Galamawa second coat surface dressed road
(2.2km) A. Y.A. Logistics Ltd Dutse 87,785,923.24 87,785,923.24 26,024,777.61 19/10/2017 16 weeks 30 On-going
63 Constr of Drainages and Culverts at Gida Dubu, Dutse Sabon Garin Yaya Ltd. Dutse 96,606,796.61 96,606,796.61 77,491,078.24 3/10/2017 6 months 80 On-going
64
Supply and Installation of 40 unit of 90 watts and 50 unit of 36
watts stand alone solar powered streetlights in the premises of
commissioner's qtrs., Dutse Sims Nig. Ltd. Dutse 31,773,000.00 31,773,000.00 21,535,500.00 19/10/2017 4 Weeks 68 On-going
65
Supply and Installation of 40 unit of 90 watts and 50 unit of 36
watts stand alone solar powered streetlights in and around five
Building blocks at State Secretariat, Dutse Sims Nig. Ltd. Dutse 33,361,650.00 33,361,650.00 27,259,909.05 19/10/2017 4 Weeks 82 On-going
66
TDN & ITC Electrification at Nasarawa and Extension from
Maidubana to Garin malam in Gumel LGA JAG & H Int. Serv. Ltd. Gumel 43,268,605.12 43,268,605.12 22/11/2017 12 weeks Just mobilized
67 Electrification project at Daraji (I) and Daraji (II) in Gwiwa LGA Jignaj Global Ltd Gwiwa 21,183,723.27 21,183,723.27 22/11/2017 8 weeks Just mobilized
68
Supply and Installation of 150 units of solar street light of Aujara in
Jahun LGA. Sims Nig. Ltd. Jahun 95,192,680.94 95,192,680.94 14/12/2017 12 weeks Just mobilized
TOTAL 37,309,896,518.88 39,206,700,963.65
Min. of Education
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT COMPL. STATUS REMARKS
AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K DATE PERIOD IN %
1
Establishment of 81 Nomadic Adult Literacy Centres in Collaboration with the
Agency for Mass Education Agency for Mass Education Various Schools 10,878,300.00 10,878,300.00 10,878,300.00 27/10/2011 On-going
2
Procurement of 2-sets of Sporting facilities at Bamaina Talented & Gifted School,
B/kudu L.G.A. BM Inv est. Nig. Ltd. B/kudu 36,030,000.00 36,030,000.00 31,987,558.79 16/8/2012 12 weeks 85 On-going
3 Supply of Classrooms, Staff Houses & Office Equip. to JICORAS A. Barde Global Concept. K/hausa 33,143,878.07 33,143,878.07 24,952,793.85 13/12/2012 3 weeks 75 On-going
4 Supply of Library books to JICORAS Al-kassam Jannah K/Hausa 30,785,750.00 30,785,750.00 28,526,075.95 2/5/2013 8 weeks 92 On-going
5 Constr. works at JICORAS (phase II) Datum Constr. Co. K/Hausa 1,677,895,165.73 1,677,895,165.73 1,295,583,983.29 30/8/13 18 weeks 77 On-going
6
Constr. of 1No. Block of Sabbatical Lodge, 5No Principal Officers Quarters 3No
Blocks 240 Capacity Students Hostels and Construction of Road Network Culvert
and Drainages at Jigawa State University Kafin Hausa (Phase III) Datum Const. Nig. LTD K/Hausa 2,574,587,179.00 2,574,587,179.00 873,397,813.68 28/11/2013 6 Months 34 On-going
7 Construction of Senate Building at Jigawa State University , K/hausa A.G Ferrero K/Hausa 1,698,949,299.60 1,698,949,299.60 1,402,653,999.60 24/7/2014 10 months 83 On-going
8 Construction of Vice Chancellor's lodge at Jigawa State University , K/Hausa A.G Ferrero K/Hausa 128,891,563.50 128,891,563.50 118,069,738.50 1/8/2014 9 months 92 On-going
9
Supply and Installation of 5HP Pumps at BEC Camp For the use of State
University Modang Inv estment Nig. Ltd Auyo 2,436,750.00 2,436,750.00 623,000.00 23 On-going
10
Commissioning as Consultant for the Designing and Superv ision of (phase II) for the
constr.of Jigawa State University , K/Hausa Design Plus + K/Hausa 158,703,031.78 158,703,031.78 107,283,361.53 12/18/2014 18months 67 On-going
11
Procurement of 1000no. College Tablets, CAMP 1000 students for the period of (5)
weeks E-learning Programme Activ ities Echo Infotech Solutions H/qtrs. 34,311,150.00 34,311,150.00 28,508,507.50 12/3/2015 2 months 83 Stalled
12
Renov ation of 3NO.Junior Staff Quarters, Galadima 1 & 2 and Senior Staff Quarters
Block at at GGASS Danzomo KAFIYAM A GEN ENT LTD S/tankarkar 15,527,082.00 15,527,082.00 14,711,022.53 30/12/2016 8 w eeks 95 On-going
13 Constr. of 1no. Block of 10-rooms student's Hostel w ith 100 Beds at GSTC Ringim Marb Eng. & Multi-serv ices Ringim 29,145,079.84 29,145,079.84 11,251,599.16 30/12/2016 6 w eeks 38 On-going
14 Constr. of 1no. Block of 3-classrooms w ith 90no. 3-seater Desks. at GSTC Ringim Marb Eng. & Multi-serv ices Ringim 10,013,817.79 10,013,817.79 4,995,211.40 30/12/2016 6 w eeks 49 On-going
15 Constr. of 1no. Block of w orkshop w ith Standard w ork benchs at GSTC Ringim Marb Eng. & Multi-serv ices Ringim 18,564,893.17 18,564,893.17 13,651,194.30 30/12/2016 6 w eeks 73 On-going
16 Constr. of 1no. Block of tw o (2) Science Laboratories at GSTC Ringim Marb Eng. & Multi-serv ices Ringim 28,487,680.00 28,487,680.00 14,554,973.87 30/12/2016 6 w eeks 51 On-going
17
Constr. of Second phase Islamiyya Classroom blocks at Kadeta (Medu
ward) in Gagarawa Constituency. Esmail Ventures Ltd. Gagarawa 2,728,050.34 2,728,050.34 4/4/2017 6 weeks Just mobilized
18 General Renov ation of Gov ernment unity Commercial School Dutse AL-HAMSAD INVST LTD Dutse 87,655,390.48 87,655,391.48 42,353,731.16 22/08/2017 20 weeks 48 On-going
19
Constr. Of 3No.Classrooms Blocks, Administration Block, 2no 6-Seater VIP
Toilet and Provision of 1No. Hand Pump at Government Day Secondary
School Danmasara, Dutse. MUTUAL INFRASTRU Dutse 28,008,767.60 28,008,767.60 22/08/2017 8 weeks just mobilized
BAL. C/F 6,606,742,828.90 6,606,742,829.90
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
BAL. B/F 6,606,742,828.90 6,606,742,829.90
20
Constr. Of Islamiyya Classroom Blocks as Contituency Project at Mariri,
Kangire and Nafara in Birnin Kudu Constituency NUSHE BUSINESS RES B/Kudu 9,819,816.00 9,819,816.00 23/08/2017 6 Weeks just mobilized
21
Constr. Of Islamiyya Classroom Blocks 2017 Constituency Project Phase I
at Meso and Diginsa in Birniwa Local Government Area. MUSFAT GEN ENTER Birniwa 6,536,639.40 6,536,639.40 7/9/2017 5 Weeks just mobilized
22
Constr. Of Islamiyya Classroom Blocks as Contituency Project at Malam
Bako Gari and Togai in Sule Tankarkar Constituency MANHAF GLOBAL CONS S/tankarkar 6,538,905.86 6,538,905.86 23/08/2017 5 Weeks just mobilized
23
Constr. Of Islamiyya Classroom Blocks 2017 Constituency Project Phase I
at Garin Gambo and Karkasara in Gumel Local Government Area. JAG & H INT SERVICES Gumel 6,492,754.80 6,492,754.80 23/08/2017 5 Weeks just mobilized
24
Constr. Of Islamiyya Classroom Blocks 2017 Constituency Project Phase I
at Malarin Gama and Matsa in Malam Madori Local Government Area. AZZIDS NIG ENT LTD M/Madori 6,519,858.46 6,519,858.46 16/08/2017 5 Weeks just mobilized
25
Constr. Of Islamiyya Classroom Blocks 2017 Constituency Project Phase I
at Babebara, Kazaurawa, Wurya, wurya and Zangon Nagogo in Gwaram
Local Government Area. AZZIDS NIG ENT LTD Gwaram 16,321,387.00 16,321,387.00 16/08/2017 7 weeks just mobilized
26
Constr. Of Islamiyya Classroom Blocks 2017 Constituency Project Phase I
at kadoma , Kularan and Gidan Gamji in Jahun Local Government Area. LOYALTY PROPERTIE LTD Jahun 9,797,397.75 9,797,397.75 6,216,598.50 17/08/2017 6 Weeks 63 On-going
27
Constr. Of Islamiyya Classroom Blocks 2017 Constituency Project Phase I
at Bakin Jeji,Jutai, Ijje and G/sarkin Aska in Dutse Local Government Area. ALKASAM JANNAH NIG LTD Dutse 13,117,868.10 13,117,868.10 16/08/2017 6 Weeks On-going
28
Constr. of a block 3 classrooms, an Admin Block, Constr. Of 2No. 6-Seater
VIP Toilets, Provision of 1No. Hand Pump and constr. Of a Block of
Laboratory at GGDSS Gumel DANGATA MEMORIAL Gumel 38,086,803.23 38,086,803.23 31,467,256.84 24/08/2017 12 Weeks 82 On-going
29
Constr. of a block 3 classrooms, an Admin Block, Constr. Of 2No. 6-Seater
VIP Toilets, Provision of 1No. Hand Pump and constr. Of a Block of
Laboratory at GGDSS Dutse BABANDOKI GEN ENT LTD Dutse 37,962,436.27 37,962,436.27 28,497,014.14 24/08/2017 12 Weeks 75 On-going
30
Constr. of a block 3 classrooms, an Admin Block, Constr. Of 2No. 6-Seater
VIP Toilets, Provision of 1No. Hand Pump at GGDSS M/madori BABANDOKI GEN ENT LTD M/Madori 29,031,555.81 29,031,555.81 20,879,779.24 24/08/2017 12 Weeks 72 On-going
31
Constr. Of a block of 3-Class Rooms, Constr.. Of an Admin, Block, Constr. Of
2No. 6 Seater VIP Toilets and Provision of 1No. Hand Pump at GDSS Shagari
Quarters, Hadejia DANGATA MEMORIAL Hadejia 29,008,767.70 29,008,767.70 20,879,779.24 24/08/2017 12 Weeks 72 On-going
32
Constr. Of a block of 3-Class Rooms, Constr.. Of an Admin, Block, Constr. Of
2No. 6 Seater VIP Toilets and Provision of 1No. Hand Pump at GGDSS
Babura DANGATA MEMORIAL Babura 31,487,476.82 31,487,476.82 20,157,721.14 24/08/2017 12 Weeks 64 On-going
BAL. C/F 6,847,464,496.10 6,847,464,497.10
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
BAL. B/F 6,847,464,496.10 6,847,464,497.10
33
Constr. Of a block of 3-Class Rooms, Constr.. Of an Admin, Block, Constr. Of
2No. 6 Seater VIP Toilets and Provision of 1No. Hand Pump at GGDSS
Kiyawa NGALOMA CONST LTD Kiyawa 28,851,997.41 28,851,997.41 23,351,821.34 24/08/2017 2 Weeks 81 On-going
34
Constr. Of a block of 3-Class Rooms, Constr.. Of an Admin, Block, Constr. Of
2No. 6 Seater VIP Toilets and Provision of 1No. Hand Pump at GGDSS Roni SABON GARIN YAYA Roni 29,141,489.44 29,141,489.44 25,430,638.41 24/08/2017 12 Weeks 87 On-going
35
Constr. Of a block of 3-Class Rooms, Constr.. Of an Admin, Block, Constr. Of
2No. 6 Seater VIP Toilets and Provision of 1No. Hand Pump and Constr. Of a
Block of Laboratory at GGDSS Kazaure IMAM AHMAD NIG LTD Kazaure 38,086,803.23 38,086,803.23 23,266,638.25 24/08/2017 12 Weeks 61 On-going
36 Constr. Of Twelve (12No) Hand Pumps to Schools at Various Locations BABANDOKI GEN ENT Various 9,344,745.00 9,344,745.00 4,672,237.50 24/08/2017 12 Weeks 50 On-going
37
Renovation of Science /ICT Laboraties at 8No. Centre of Excellence in the
state (GGUSS Kazaure, GUSS Maigatari, GDSS Babura, GGUSS M/Madori,
GDSS Garun Gabas, GDSS Bulangu, GUSS Basirka and GGUSS Gwaram). MUGIN INVT LTD Various 41,352,400.79 41,352,400.79 22,548,446.79 21/08/2017 12 Weeks 54 On-going
38
Variation for Variation / Additional Workls in Respect of Lott II&III at Sule
Lamido University, Kafin Hausa. DATUM CONST NIG LTD K/Hausa 238,484,947.28 238,484,947.28 14/08/2017 On-going
39
Procurement and Installation of Ict Equipment at 8No. Centre of ex cellence (GGUSS
Kazaure, GUSS Maigatari, GDSS Babura, GGUSS M/Madori, GDSS Garun Gabas,
GDSS Bulangu, GUSS Basirka and GGUSS Gw aram). NGALOMA CONST LTD Various 148,885,944.48 148,885,944.48 100,488,202.92 17/08/2017 8 w eeks 67 On-going
40
Supply of 30,000 Sets of Schools Uniforms to all SS-1 Girls of Senior Secondary
Schools Across the State 313 TEXTILE NIG LTD State 74,655,000.00 74,655,000.00 52,258,500.00 22/08/2017 8 w eeks 70 On-going
41
Construction of Block of 3-Classrooms, Adminisrative Block, 2No. Of 6-
seater pit latrines and 1No. Hand Pump at Government Day Secondry
School Jahun (lot-8) for 2017 1St and 2nd Quarter Capital projects (Phase
II) across the State. Modang Invest Ltd Jahun 29,102,893.90 29,102,893.90 27/12/2017 12 weeks just mobilized
42
Construction of Block of 3-Classrooms, Adminisrative Block, Laboratoty
Block, 2No. Of 6-seater pit latrines and 1No. Hand Pump at Government
Day Secondry School Kanti Kazaure (lot-12) for 2017 1St and 2nd Quarter
Capital projects (Phase II) across the State. A A Maikatako Gen. Kazaure 29,158,821.20 29,158,821.20 27/12/2017 12 weeks just mobilized
43
Construction of Block of 3-Classrooms, Adminisrative Block, 2No. of 6-
seater pit latrines and 1No. Hand Pump at Government Day Secondry
School Galamawa (lot-11) for 2017 1St and 2nd Quarter Capital projects
(Phase II) across the State. A A Maikatako Gen. Dutse 29,158,821.11 29,158,821.11 27/12/2017 12 weeks Just mobilized
BAL. C/F 7,543,688,359.94 7,543,688,360.94
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
BAL. B/F 7,543,688,359.94 7,543,688,360.94
44
Construction of Block of 3-Classrooms, Adminisrative Block, 2No. of 6-
seater pit latrines and 1No. Hand Pump at Government Day Secondry
School Dutse (lot-14) for 2017 1St and 2nd Quarter Capital projects (Phase
II) across the State. Sassauci Multi Trade Dutse 29,137,148.24 29,137,148.24 27/12/2017 12 weeks Just mobilized
45
Construction of Block of 3-Classrooms, Adminisrative Block, 2No. of 6-
seater pit latrines and 1No. Hand Pump at Government Day Secondry
School Kadira (lot-15) for 2017 1St and 2nd Quarter Capital projects (Phase
II) across the State. Sassauci Multi Trade K/kasamma 29,137,148.24 29,137,148.24 27/12/2017 12 weeks Just mobilized
46
Construction of Block of 3-Classrooms, Adminisrative Block, 2No. of 6-
seater pit latrines and 1No. Hand Pump at Government Day Secondry
School Dakido (lot-16) for 2017 1St and 2nd Quarter Capital projects
(Phase II) across the State. Masaka Glo. Con. Ltd M/madori 29,140,358.61 29,140,358.61 27/12/2017 12 weeks Just mobilized
47
Construction of Block of 3-Classrooms, Adminisrative Block, 2No. of 6-
seater pit latrines and 1No. Hand Pump at Government Day Secondry
School Dansure (lot-13) for 2017 1St and 2nd Quarter Capital projects
(Phase II) across the State. Sassauci Multi Trade Roni 29,137,148.24 29,137,148.24 27/12/2017 12 weeks Just mobilized
48
Construction of Block of 3-Classrooms, Adminisrative Block, Laboratoty
Block, 2No. Of 6-seater pit latrines and 1No. Hand Pump at Government
Day Secondry School Gada (lot-19) for 2017 1St and 2nd Quarter Capital
projects (Phase II) across the State. Sabon Gari 'Ya'ya Nig Kazaure 37,964,046.26 37,964,046.26 27/12/2017 12 weeks Just mobilized
49
Construction of Block of 3-Classrooms, Adminisrative Block, Laboratoty
Block, 2No. Of 6-seater pit latrines and 1No. Hand Pump at Government
Day Secondry School Ringim (lot-21) for 2017 1St and 2nd Quarter Capital
projects (Phase II) across the State. Sabon Gari 'Ya'ya Nig Ringim 37,964,046.26 37,964,046.26 27/12/2017 12 weeks Just mobilized
50
Construction of Block of 3-Classrooms, Adminisrative Block, Laboratoty
Block,2No. Of 6-seater pit latrines and 1No. Hand Pump at Government
Day Secondry School Dundubus (lot-18) for 2017 1St and 2nd Quarter
Capital projects (Phase II) across the State. Imam Ahmad Nig. Ltd. Dutse 37,923,773.12 37,923,773.12 27/12/2017 12 weeks Just mobilized
51
Construction of Block of 3-Classrooms, Adminisrative Block, Laboratoty
Block, 2No. Of 6-seater pit latrines and 1No. Hand Pump at Government
Day Secondry School Hadejia (lot-20) for 2017 1St and 2nd Quarter Capital
projects (Phase II) across the State. Imam Ahmad Nig. Ltd. Hadejia 37,923,773.12 37,923,773.12 27/12/2017 12 weeks Just mobilized
52
Construction of Block of 3-Classrooms, Adminisrative Block, Laboratoty
Block, 2No. Of 6-seater pit latrines and 1No. Hand Pump at Government
Day Secondry School Sabuwar Gwaram (lot-10) for 2017 1St and 2nd
Quarter Capital projects (Phase II) across the State. A A Maikatako Gen. Gwaram 29,158,821.11 29,158,821.11 27/12/2017 12 weeks Just mobilized
53
Construction of One (1No.) Students Hostel on Existing foundation at the
Institute of Information Technology, Kazaure. Nushe Biz. Resources Kazaure 49,831,834.74 49,831,834.74 18/12/2017 12 weeks Just mobilized
BAL. C/F 7,891,006,457.88 7,891,006,458.88
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
BAL. B/F 7,891,006,457.88 7,891,006,458.88
54
Construction of Block of 3-Classrooms, Adminisrative Block, Laboratoty
Block, 2No. Of 6-seater pit latrines and 1No. Hand Pump at Government
Day Secondry School Ringim (lot-9) for 2017 1St and 2nd Quarter Capital
projects (Phase II) across the State. Alhansad Invest. Ltd. Ringim 29,086,685.06 29,086,685.06 27/12/2017 12 weeks Just mobilized
55
Construction of Block of 3-Classrooms, Adminisrative Block, Laboratoty
Block, 2No. Of 6-seater pit latrines and 1No. Hand Pump at Government
Day Secondry School Gada (lot-17) for 2017 1St and 2nd Quarter Capital
projects (Phase II) across the State. Alhansad Invest. Ltd. Kazaure 38,092,674.78 38,092,674.78 27/12/2017 12 weeks Just mobilized
56
Supply and disribution of 3-Seater Desks (Lot-1) at Senior Secondry Schools
for 2017 1St and 2nd Quarter Capital projects (Phase II) across the State. Modang Invest Ltd Across the state 13,919,062.50 13,919,062.50 27/12/2017 6 weeks Just mobilized
57
Supply and disribution of 3-Seater Desks (Lot-2) at Senior Secondry Schools
for 2017 1St and 2nd Quarter Capital projects (Phase II) across the State. Babandoki Gen. Ent. Ltd. Across the state 10,745,876.25 10,745,876.25 27/12/2017 6 weeks Just mobilized
58
Supply and disribution of 3-Seater Desks (Lot-4) at Senior Secondry Schools
for 2017 1St and 2nd Quarter Capital projects (Phase II) across the State. Wajab Building Across the state 11,244,675.96 11,244,675.96 27/12/2017 6 weeks Just mobilized
59
Supply and disribution of 3-Seater Desks (Lot-6 & 3) at Senior Secondry
Schools for 2017 1St and 2nd Quarter Capital projects (Phase II) across the
State. Abdulcom Proj. & Service Across the state 60,124,242.25 60,124,242.25 27/12/2017 12 weeks Just mobilized
60
Supply and disribution of 3-Seater Desks (Lot-7 & 5) at Senior Secondry
Schools for 2017 1St and 2nd Quarter Capital projects (Phase II) across the
State. Furni Elect Global Across the state 12,661,754.35 12,661,754.35 27/12/2017 12 weeks Just mobilized
63
procurement of E-Books Software for Senior Secondry Schools across the
State Learn Africa Nig. Ltd Across the state 10,000,000.00 10,000,000.00 22/12/2017 8 weeks Just mobilized
66
Constr. of Second phase Islamiyya Classroom blocks at Fanisau (Karnaya
ward) and Gofai (Limawa ward) in Dutse Constituency Al-kasam Jannah Dutse 5,551,958.00 5,551,958.00 20/3/2017 6 weeks Just mobilized
69
Constr. of Second phase Islamiyya Classroom blocks at Kukuma Kofar
Yamma and Gubabbiya (Madabe ward) in Buji Constituency Loyalty Properties Ltd. Buji 5,449,021.80 5,449,021.80 20/3/2017 6 weeks Just mobilized
Total 8,087,882,408.83 8,087,882,409.83
Government House
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT AMOUNT REVISED VA LUE OF C OM M EN C EM EN TC OM P L. STATUS REMARKS
(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
Total - -
Min of Land & Housing
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
AMOUNT (N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
1
Constr. of Official Residence of the Secretary to the State Government
(SSG) at Dutse Sahal-Bin Nig. Ltd. Dutse 55,984,869.84 81,708,978.77 64,280,375.51 11/23/2016 16 weeks 79 On-going
2
Constr. of Official Residence of the Head of Civ il Serv ice (HOS) at
Dutse Design Three Sixty Ltd. Dutse 57,712,714.98 76,417,973.36 53,040,338.14 11/23/2016 16 weeks 69 On-going
TOTAL 113,697,584.82 158,126,952.13
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
AMOUNT (N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
BALANCE B/F 113,697,584.82 158,126,952.13
26
TOTAL 113,697,584.82 158,126,952.13
Min. of Commerce
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT AMOUNT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
1 Constr. of (3.5km) Culverts & Drainage at Sara Market Beefar Constr. Nig. Ltd. Gwaram 76,329,801.45 76,329,801.45 59,864,067.40 22/11/2012 3 months 78 Stalled
2 Extension of road works at Maigatari Border Free Zone Beefar Constr. Nig. Ltd. Maigatari 37,677,600.00 37,677,600.00 11,259,724.00 11/12/2012 20 weeks 30 Stalled
3
Consultancy services for the Constr. of
Drainages at Sara, Maigatari + Gujungu
markets Stirling Dev. Ltd. State 19,140,670.57 19,140,670.57 16,621,973.19 14/10/12 6 months 90 Stalled
Total 133,148,072.02 133,148,072.02
Directorate of Economic Empowerment
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
Total - -
Dutse Capital Development Agency
P OST C ON T R A C T P R OJEC T EVA LUA T ION
S/ N P R OJEC T EXEC UT OR LOC A T ION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS
AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %
1 Constr. of New High Brow lay out in Dutse Dantata & Saw oe Dutse 3,822,690,275.89 5,073,417,718.02 4,577,814,987.09 14/10/2011 48 w eeks 83 Stalled
2 Constr. of Dutse tow nship road (15 & 20) Dantata & Saw oe Dutse 760,653,932.06 760,653,932.06 540,282,932.70 20/12/12 16 w eeks 73 Stalled
3
Prov ision & Installation of Streetlights at the 3 Arms zone, Ibrahim Aliy u
Eastern By e-pass and Old Police Hqrs. To Gadadin-Fanisau Link road,
Dutse. Dantata & Saw oe Dutse 1,064,545,077.91 1,267,613,083.02 1,058,862,394.59 8/11/2012 12 w eeks 95 Stalled
4 Rehab. Of Dutse Tow nship road phase II (10.110km) CGC Nig. Ltd. Dutse 2,129,872,584.00 3,173,304,408.80 2,688,981,022.36 8/11/2012 14 months 82 Stalled
5 Rehab. Of Dutse Tow nship road phase I (1.250km) CGC Nig. Ltd. Dutse 487,164,968.00 972,442,157.57 812,016,426.23 8/11/2012 14 months 83 Stalled
6 Re-dualisation of Old Police H/qtrs-Gadadin road (2.55km) Dantata & Saw oe Dutse 1,487,873,351.19 1,487,873,351.19 646,282,346.61 11/4/2013 6 months 41.37 Stalled
7 Dualisation of Ibrahim Aliy u road (Dutse Eastern By e-pass) (5.65km) Dantata & Saw oe Dutse 2,861,812,037.79 3,160,794,816.68 1,471,973,980.73 11/4/2013 9 months 46 On-going
8 Constr. of 30No. Houses for Lagislators Afdin Constr. Co. Ltd. Dutse 1,682,137,080.00 1,995,675,982.50 1,822,670,433.15 19/8/13 14 month 91 On-going
9
Consultant for the Constr. Of 30N0. Houses for Jigaw a State members of
the House of Assembly at Disina HAG Eng. Nig. Limited Dutse 131,922,214.60 147,301,384.74 140,671,347.56 11/7/2012 14 months 91 On-going
10
Constr. Of Streetlights on Dutse township roads (17.576KM) phase I
& II CGC Nig. Limited Dutse 666,041,660.55 666,041,660.55 543,723,853.77 9/9/2013 16 weeks 85 Stalled
11
Constr. Of Access road (1.92KM) at the New House of Assembly
Members Qtrs. Disina, Dutse CGC Nig. Limited Dutse 419,305,302.03 419,305,302.03 303,493,140.29 19/9/2013 5 months 73 Stalled
12 Constr. Of River Re- Alignment project at Dutse, phase 1 (2KM) Dantata & Sawoe Dutse 1,999,219,676.02 1,999,219,676.02 558,276,899.20 26/9/2013 6 months 24 Stalled
13
Landscaping and External works at new Jigawa State
Broadcasting Complex Dantata & Sawoe Dutse 657,635,647.36 657,635,647.36 457,989,460.07 31/3/2014 6 months 66 Stalled
14
Supply and Installation of Fire Tender Trucks, Scanning Machine,
Check- in counters and Baggage handling Systems and Airfield
Lighting at new Dutse Int. Airport Afdin Constr. Nig. Ltd. Dutse 2,680,358,940.00 2,680,358,940.00 2,619,594,717.36 4/6/1900 4weeks 98 Ongoing
15
Letter of Commissioning as Consultant for the superv ision of the Dutse
International Airport project Phase 1c (Additional w orks) El-Mansur Atelier Co. Dutse 124,304,403.67 124,304,403.67 123,180,403.67 2/3/2015 12 months 99 On-going
TOTAL 20,975,537,151.07 24,585,942,464.21
Cabinet Office
POST CONTRACT PROJECT EVALUATION
S/ N P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T R EVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS
A M OUN T (N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %
1 Upgrading and Renov ation of Jigaw a State Gov ernor's Lodge Kano Anhas Nig. LTD Kano 123,614,216.81 123,614,216.81 71,987,817.49 5/11/2013 9 Months 58 On-going
2
Commissioning as Consultant on the Superv ision of the Upgrading
and Renov . of Gov ernor's Lodge Kano Design+ Consultant LTD Kano 10,097,505.90 10,097,505.90 6,555,808.21 19/11/2013 9 Months 75 On-going
3
Constr. of Daily pray er mosque at Madaw aki, Danzomo Gari and
D/tuw o gari in Sule Tankarkar Constituency NUSHE BUSINESS REC. LTD S/Tankarkar 4,712,464.77 4,712,464.77 1,525,069.35 12/15/2016 6 w eeks 36 On-going
4
Constr. of Juma'at Pray er Mosque at Medu in Gagaraw a
Constituency . Umar Roofing Products Gagaraw a 25,853,039.07 25,853,039.07 13571539.97 24/01/2017 16 w eeks 52 On-going
5
Constr. of Juma'at Prayer Mosque at Galambi, fagam
Constituency in Gwaram LGA. Ramadan Constr. Nig. Ltd. Gwaram 26,396,975.14 26,396,975.14 23,566,006.59 24/01/2017 16 weeks 89 On-going
6
Constr. of Juma'at Prayer Mosque at Kukuma yamma and
Gubabiya in Buji Constituency. Loyalty Properties Nig. Ldt. Buji 5,613,871.72 5,613,871.72 24/01/2017 6 weeks Just mobilized
7
Bituminous felt roofing and some renovations of Dutse
Central mosque Equishare Nig. Ltd. Dutse 12,552,135.05 12,552,135.05 9,828,937.91 16/8/2017 6 weeks 78 On-going
8
Constr. of five (5) Daily prayer Mosques at Kasarwa and
Jangiwa in Birniwa Constituency. Musfat Gen. Investment Birniwa 4,116,102.90 4,116,102.90 16/10/2017 6 weeks Just mobilized
9
Constr. of five (5) Daily prayer Mosques at Gidan Mutari,
Fulanin Harbo, Danmodi Gari and Hammado in Sule
Tankarkar Constituency. Munhab Global Ventures S/Tankarkar 6,543,114.75 6,543,114.75 16/10/2017 6 weeks Just mobilized
10
Constr. of Friday prayer mosque at Gada yamma in Kazaure
Constituency. (B) Yanduna Ventures Kazaure 46,882,392.01 46,882,392.01 25,133,493.06 25/10/2017 12 Weeks 53 On-going
11
Constr. of Five (5) Daily Prayer Mosques at Dawan gawo and
Karkarna in Yankwashi Constituency. Granitoids Eng. Services Yankwashi 6,148,095.00 6,148,095.00 16/10/2017 6 weeks Just mobilized
BAL. C/F 272,529,913.12 272,529,913.12
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENTC OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
BAL. B/F 272,529,913.12 272,529,913.12
12
Constr. of Five (5) Daily Prayer Mosques at Dawan gawo and
Karkarna in Gumel Constituency. JAG & H Integrated Serv. Ltd. Gumel 4,120,393.20 4,120,393.20 16/10/2017 6 weeks Just mobilized
13
Constr. of Five (5) Daily Prayer Mosques at Dausayi, Sabon
Garin Dandi and Suntilmawa in Kazaure Constituency. (A) MARB Eng. & Multy Serv. Kazaure 6,192,036.90 6,192,036.90 9/11/2017 6 weeks Just mobilized
14
Constr. of Friday Prayer Mosques at Tsabare, Dandi, Tofa and
Gidan Sarki (Friday Mosque) in Kazaure Constituency. (B) MARB Eng. & Multy Serv. Kazaure 24,779,470.59 24,779,470.59 9/11/2017 12 weeks Just mobilized
15
Constr. of Friday Prayer Mosques at Nasarawa in Gumel
Constituency. JAG & H Integrated Serv. Ltd. Gumel 15,046,340.35 15,046,340.35 16/10/2017 12 weeks Just mobilized
16
Construction of Five (5) daily Prayer Mosques at Wutsadaand
Kankare Fulani in Gwaram Constituency. Al-Nasibi Gen. Intp. Gwaram 4,129,061.98 4,129,061.98 18/12/2017 4 Weeks Just mobilized
17
Construction of Five (5) daily Prayer Mosques at Namako
(Sabon Gari Ward) in Miga Constituency. Khairussabah Nig. Ltd Miga 2,064,530.99 2,064,530.99 18/12/2017 4 Weeks Just mobilized
18
Construction of Five (5) daily Prayer Mosques at Garin Baki,
Dan Farantama, Zuge and Tudun D/Bulim in Gumel
Constituency. Jag & H Intgrt. Serv. Ltd. Gumel 8,258,123.96 8,258,123.96 18/12/2017 8 Weeks Just mobilized
19
Construction of Five (5) daily Prayer Mosques at Karshi and
Aimas Kuka in Auyo Constituency. Amm Manzo Nig. Ltd. Auyo 4,129,061.98 4,129,061.98 18/12/2017 6 Weeks Just mobilized
20
Construction of Five (5) daily Prayer Mosques at Kukuma Kudu
(Kumuma Ward), Dakori (Gantsa Ward) and Falgeri Arewa
(Falgeri Ward) in Buji Constituency. K-Manu Gen. Constr. & Engr Buji 6,193,592.97 6,193,592.97 18/12/2017 8 Weeks Just mobilized
21
Construction of Five (5) daily Prayer Mosques at S/G
Shinakani, Galadimawa and Bulangori in Buji Constituency. A+Tech Intgrt. Service Buji 6,193,592.97 6,193,592.97 18/12/2017 6 Weeks Just mobilized
22
Construction of Five (5) daily Prayer Mosques at Kiramisau,
Tage (Fandu Ward) and Maikintari (Kirikasamma Ward) in
Kirikasamma Constituency. Alh Umar Baban Doki Nig Ltd K/kasamma 6,193,592.97 6,193,592.97 18/12/2017 6 Weeks Just mobilized
BAL. C/F 359,829,711.98 359,829,711.98
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENTC OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
BAL. B/F 359,829,711.98 359,829,711.98
23
Construction of Five (5) daily Prayer Mosques at Kiramisau,
Tage (Fandu Ward) and Maikintari (Kirikasamma Ward) in
Kirikasamma Constituency. Alh Umar Baban Doki Nig Ltd K/kasamma 6,193,592.97 6,193,592.97 18/12/2017 6 Weeks Just mobilized
24
Construction of Five (5) daily Prayer Mosques at Garbagar
Gari (Garbagai Ward), Wareri (Guri Ward), Zoriyo (Adiyani
Ward), Jauron Kadira (Kadira Ward) and Dolewa (Kadira
Ward) in Guri Constituency. Alh Umar Baban Doki Nig Ltd Guri 10,322,654.95 10,322,654.95 18/12/2017 8 Weeks Just mobilized
25
Construction of Five (5) daily Prayer Mosques at Asayaya Gari
(Sule Ward), Garin Tamba (Taka Tsaba Ward), Muku Gari and
renovation of 1No. Mosque at Sule Kudu Primary School (Sule
Ward) in Sule Tankarkar Constituency. Khairubaba Nig. Ltd. S/tankarkar 8,258,123.96 8,258,123.96 18/12/2017 8 Weeks Just mobilized
26
Construction of Five (5) daily Prayer Mosques at Gidan Nagari,
Damaganawa Yamma, Kadirawa Aduchawa, Zage dantse,
Kaka lafiya, Zareku, Koya, Burji Abuja, Gwari and Zugawa in
Miga Constituency. Amia Intgr Serv. Nig. Ltd. Miga 20,645,309.99 20,645,309.99 18/12/2017 12 Weeks Just mobilized
27
Construction of Five (5) daily Prayer Mosques at
Makwarawa(Tofa Ward) and Dabi (Dabi ward) in Ringim
Constituency. Prestige Intgrt. Serv. Ringim 4,129,061.98 4,129,061.98 18/12/2017 6 Weeks Just mobilized
28
Construction of Five (5) daily Prayer Mosques at mazazzaga
(Garko Ward) and Balago Town Balago Ward) in Kiyawa
Constituency. Demastbo Ventures Ltd. Kiyawa 4,129,061.98 4,129,061.98 18/12/2017 6 Weeks Just mobilized
29
Construction of Five (5) daily Prayer Mosques at Kandila
Wuriya (Machinamari Ward), Balamalum (Machinamari
Ward) and matamu (Matamu Ward) in Birniwa Constituency. Masaka Global Concept Ltd Birniwa 6,193,592.97 6,193,592.97 18/12/2017 6 Weeks Just mobilized
30
Construction of Five (5) daily Prayer Mosques at Jemawa,
Sansami, Muna fadi and Construction of Juma'at Prayer
Mosque at Kanya Town in Kanya Babba Constituency of
Babura Local Govt Area. Deetech Nig. Ltd. Babura 16,304,386.14 16,304,386.14 18/12/2017 12 Weeks Just mobilized
31
Construction of Five (5) daily Prayer Mosques at Mirgina,
Danbuwayi, Zuge, UnguwarKiwo, Dan Goriba and
Construction of Juma'at Prayer Mosque at Danbanki in Sule
Tankarkar Constituency. Bulangu Drilling Services S/tankarkar 22,536,624.84 22,536,624.84 18/12/2017 12 Weeks Just mobilized
BAL. C/F 458,542,121.76 458,542,121.76
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENTC OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
BAL. B/F 458,542,121.76 458,542,121.76
32
Construction of Five (5) daily Prayer Mosques at Kajimaran
(Dawa Ward), Garin Malam (Abunabo Ward), Zango Tsangaya
(Matara Babba Ward), Guri Nayinawa (Guri Ward) and Guri
Town Yallari (Guri Ward) in Guri Constituency. Jiffa Enterprises Guri 10,322,654.95 10,322,654.95 18/12/2017 8 Weeks Just mobilized
33
Construction of Five (5) daily Prayer Mosques at J/Habuja,
Gorum Wangara, Barde rabe (Madobi Ward), Maya-maya
(Kudai Ward), Katangar Lafiya (Madobi Ward) and Sharifai
(Madobi Ward) in Dutse Constituency. Al-Kasam Jannah Nig. Ltd. Dutse 14,451,716.93 14,451,716.93 18/12/2017 8 Weeks Just mobilized
34
Construction of Five (5) daily Prayer Mosques at Kabala,
Sabuawr Gada, Gabori and Majira in jahun Constituency. Yanduna Ventures Ltd. Jahun 8,258,123.96 8,258,123.96 18/12/2017 8 Weeks Just mobilized
35
Construction of Five (5) daily Prayer Mosques at Shaiskawa,
Gabas, Badado, Mai tsani, Gezoji, Durgutawa, Dunguliya and
Gurunfa in Kazure Constituency. Yanduna Ventures Ltd. Kazaure 14,451,716.93 14,451,716.93 18/12/2017 12 Weeks Just mobilized
36
Construction of Five (5) daily Prayer Mosques at Kandi (Bata
Ward), Unguwar Magaji (BataWard) and
completion/renovation of Juma'at Prayer Mosques at Babura
Central Mosque, Jigawar Dan Ali central and Babura Jibwis in
Babura Constituency. Mufabamex Concept Ltd. Babura 21,631,959.79 21,631,959.79 18/12/2017 12 Weeks Just mobilized
37
Construction of Five (5) daily Prayer Mosques at Dazara Waje,
Lewa, Sara kudu, Unguwar Gwanji, Gwanjira and Yadda in
Gwaram Constituency. Nushe Business Resources Gwaram 12,387,185.94 12,387,185.94 18/12/2017 8 Weeks Just mobilized
38
Construction of Five (5) daily Prayer Mosques at Sabuawar
Kaura, Kiyako, Birnin kudu, Samamiya and Bigidan in Birnin
Kudu Constituency. Nushe Business Resources B/kudu 10,322,654.95 10,322,654.95 18/12/2017 8 Weeks Just mobilized
39
Construction of Three (3) daily Prayer Mosques at Yakasai,
Unik Babba and Kalgwai in Auyo Constituency. Xtra 99 Intgrt Services Ltd. Auyo 6,193,592.97 6,193,592.97 18/12/2017 6 weeks Just mobilized
40
Construction of Juma'at Prayer Mosques at Garin Mado in
Gagarawa Constituency. Modang Investment Ltd. Gagarawa 9,527,340.25 9,527,340.25 18/12/2017 12 Weeks Just mobilized
BAL. C/F 566,089,068.43 566,089,068.43
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENTC OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
BAL. B/F 566,089,068.43 566,089,068.43
41
Construction of Juma'at Prayer Mosques at Gidan Dallaand
Kaban in Auyo Constituency. A.A Aljazeera Agro Processing Auyo 19,880,299.20 19,880,299.20 18/12/2017 12 Weeks Just mobilized
42
Construction of Juma'at Prayer Mosques at Turbus in
Maigatari Constituency. Alkawakeb Global Concept Maigatari 13,748,890.28 13,748,890.28 18/12/2017 12 Weeks Just mobilized
43
Construction of Juma'at Prayer Mosques at Tsadawa,
Abakura and Tsinaho in Taura Constituency. Dan Kwara Maijimina NigLtd Taura 10,258,059.52 10,258,059.52 18/12/2017 12 Weeks Just mobilized
44
Construction of Juma'at Prayer Mosques at Dagaceri (Batu
Ward) in Birniwa Constituency. Amm Manzo Nig. Ltd. Birniwa 14,403,675.29 14,403,675.29 18/12/2017 12 Weeks Just mobilized
45
Construction of Juma'at Prayer Mosques at Tattari Maigatari
Constituency. A.A. Maikatako Gen. Entp Maigatari 8,152,066.79 8,152,066.79 18/12/2017 12 Weeks Just mobilized
46
Construction of Juma'at Prayer Mosques at Karkarna and
completion/renovation of Juma'at prayer Mosque at
Yankwashi Central Mosque in Yankwashi Constituency. Granatoids Engr. Services Yankwashi 29,994,641.37 29,994,641.37 18/12/2017 12 Weeks Just mobilized
47
Completion/renovation of Juma'at Prayer Mosques at Jibwis
Garki in Garki Constituency. Jag & H Intgrt Services Ltd Garki 23,736,083.26 23,736,083.26 18/12/2017 12 Weeks Just mobilized
48
Completion/renovation of Juma'at Prayer Mosques at
Shabaru in Suletankarkar Constituency. A.A. Maikatako Gen. Entp S/tankarkar 3,091,180.72 3,091,180.72 18/12/2017 12 Weeks Just mobilized
49
Completion/renovation of Juma'at Prayer Mosques at
Gabarin, Tsungur, Shafar Daurawa, Sankara, Karshi and
K/Babushe in Ringim Constituency. Marb Engr. & Multi Services Ringim 25,604,269.74 25,604,269.74 18/12/2017 12 Weeks Just mobilized
50
Completion/renovation of Juma'at Prayer Mosques at
Yarkurshe, Dan Barge, Ganga, Kwanar Garki, GGSS Garki,
Kaya, Kargo, Kafadodo and Batakashi in Garki Constituency. MMZ Garki Consrt Ltd Garki 18,344,212.97 18,344,212.97 18/12/2017 12 Weeks Just mobilized
51
Completion/renovation of Juma'at Prayer Mosques at Izala
Basirka, Kawari, Matsango and Construction of Juma'at
Prayer Mosques at Basirka Central and Wall Fencing at Digijin
Juma'at Mosque in Fagam Constituency in Gwaram L. G. A. G. M. Sara & Sons Ltd Gwaram 44,858,345.27 44,858,345.27 18/12/2017 14 Weeks Just mobilized
52
Completion/renovation of Juma'at Prayer Mosques at
Dansure and Roni kudu and Construction of Juma'at Prayer
Mosques at Kaya and Wall Fencing at Takwardawa in Roni
Constituency. Na'ayi Recources Ltd. Roni 33,832,397.35 33,832,397.35 18/12/2017 12 Weeks Just mobilized
BAL. C/F 811,993,190.19 811,993,190.19
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENTC OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
BAL. B/F 811,993,190.19 811,993,190.19
53
Construcction of Wall fencing of Juma'at Prayer Mosque at
Gidar Sarki in Kafin Hausa Constituency. AMM Manzo Nig. Ltd. K/Hausa 2,048,758.99 2,048,758.99 18/12/2017 6 Weeks Just mobilized
54
Renov of five (5) Daily prayer mosque at Arki town (Arki ward)
in M/madori Constituency Ramadan Constr Co. M/madori 2,064,530.99 2,064,530.99 18/12/2017 6 Weeks Just mobilized
55
Completion/renovation of Juma'at Prayer Mosques at
Sarawa, Fadawa and Adin in Kafin Hausa Constituency in
Gwaram L. G. A. Demastbo Ventures Ltd. K/Hausa 9,338,782.31 9,338,782.31 18/12/2017 12 Weeks Just mobilized
56
Construction of Five (5) Daily Prayer Mosques at Gilima,
Gidan Naruwa, Kundu-Gidan Liman, Kukuy (Chukuto ward),
Zangon Maje, Kaya-Gazara (Chukuto ward) and Dogon Marke
(Kwalam ward) in Taura Constituency. A.Y. Dan baba Nig. Ltd. Taura 14,451,716.93 14,451,716.93 18/12/2017 8 Weeks Just mobilized
57
Construction of Five (5) Daily Prayer Mosques at Kofar Fada
Mafudi in fagam Constituency. G.M. Sara & Sons Ltd. Gwaram 2,064,530.99 2,064,530.99 18/12/2017 4 Weeks Just mobilized
58
Construction of Five (5) Daily Prayer Mosques at Tsigi, Yar
Kasuwa and Gidan Ganji in Jahun Constituency. A.A. Aljazeera Agro Jahun 6,686,394.75 6,686,394.75 2,117,358.34 16/10/2017 12 Weeks 32 On-going
59
Construction of Five (5) Daily Prayer Mosques at Garbagal
Gari (Garbagal ward), Wareri (Guri Ward), Zoriyo (Adiyani
ward), Jauron Kadira (Kadira ward) and Dolewa (Kadira ward)
in Guri Constituency. Alh. Umaru Baban Doki Guri 10,322,654.95 10,322,654.95 18/12/2017 8 Weeks Just mobilized
60
Construction of Five (5) Daily Prayer Mosques atGuntai Gari in
Gwiwa Constituency. Daragi and Sons Gwiwa 2,064,530.99 2,064,530.99 18/12/2017 4 Weeks Just mobilized
61 Constr o f Friday prayer mosque at Zingaren in Gagarawa Constituency M odeng Invest. Ltd. Gagarawa 16,202,181.67 16,202,181.67 12,561,077.74 13/10/17 12 weeks 77 On-going
62 Constr o f 6no. M osque Kawu Nig. Ltd. K/Hausa 34,411,150.73 34,411,150.73 24,572,622.53 16/10/17 12 weeks 71 On-going
63
Completion of 6no. Juma'at mosque at Basirka, Bagadaza, T/wada,
Kadale, Garko, Gyalman, Lata Dutse, Dalai and Bunbuliya in Fagam
Constituency of Gwaram L.G.A. Ramadan Gen. Ltd. Gwaram 23,935,403.75 23,935,403.75 16,046,195.22 16/10/17 8 weeks 67 On-going
64 Constr o f Friday mosque at Firjin yamma in Gwiwa constituency Jignag Global Constr Ltd. Gwiwa 25,063,610.67 25,063,610.67 10,883,363.67 16/10/2017 12 weeks 41 On-going
TOTAL 960,647,437.91 960,647,437.91
Min. of Information
P OST C ON T R A C T P R OJEC T EVA LUA T ION
S/ N P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T A M OUN T R EVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS
(N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %
1
Consultancy Serv ices for the Constr. Of 5No. Mini
Stadiums in the state (stage 1, II & III) Design Plus Consultant Ltd. Dutse 72,628,137.06 72,628,137.06 68,045,437.48 10/2/2012 6 months 94 On-going
Total 72,628,137.06 72,628,137.06
Min. of Agriculture
P OST C ON T R A C T P R OJEC T EVA LUA T ION
S/ N P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T A M OUN T REVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS
(N ) CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %
1
Procurement of 2000 Metric Tons of Urea (46:0:0) for 2016 Wet
season Atafi Agro Merchandise in the state 224,400,000.00 224,400,000.00 9/5/2016 4 w eeks Rev oked
2
Procurement of 1000 Metric Tons of NPK 20:10:10+1S+1Zn for
2016 Wet season Continental Fertilizer Ltd. in the state 105,000,000.00 105,000,000.00 9/5/2016 4 w eeks Rev oked
3
Procurement of 500 Metric Tons of SSP (0:54:0) for 2016 Wet
season MBS Merchants Ltd. in the state 50,000,000.00 50,000,000.00 9/5/2016 4 w eeks Rev oked
TOTAL 379,400,000.00 379,400,000.00
Min. of Women Affairs
POST CONTRACT PROJECT EVALUATION
S/ N P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T R EVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS
A M OUN T (N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %
Total - -
Head of Service
P OST C ON T R A C T P R OJEC T EVA LUA T ION
S/ N . P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T R EVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS
A M OUN T C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %
,
TOTAL - -
Science & Tech.
P OST C ON T R A C T P R OJEC T EVA LUA T ION
S/ N . P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T R EVISED VA LUE OF C OM M EN C EM EN TC OM P L.ST A T US R EM A R KS
A M OUN T (N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %
Total - -
State Universal Besic Edu. Board
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENTC OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
1
Total - -
Jigawa State Independent Electoral Commission
POST CONTRACT PROJECT EVALUATION
S/ N P R OJEC T EXEC UT OR LOC A T IONC ON T R A C T A M OUN T R EVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS
(N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %
Total - -
Min. of Justice
POST CONTRACT PROJECT EVALUATION
S/ N P R OJEC T EXEC UT OR LOC A T IONC ON T R A C T A M OUN T R EVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS
(N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %
1
Renovation of Juvenile
Prison/Constr. Of gate lodge,
Mosque, Classroom and
Perimeter wall fence at
Babura town. Naila Multi Services Babura 33,500,000.00 37,269,674.07 26,499,632.30 20/12/2016 12 weeks 70 On-going
Total 33,500,000.00 37,269,674.07
GH
POST CONTRACT PROJECT EVALUATION
S/ N P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T R EVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS
A M OUN T (N ) C ON T R A C T SUM (N ) C ER T IF IED WOR K D A T E P ER IOD IN %
Total - -
Agency for Nomadic Edu.
P OST C ON T R A C T P R OJEC T EVA LUA T ION
S/ N P R OJEC T EXEC UT OR LOC A T IONC ON T R A C T A M OUN T REVISED VA LUE OF C OM M EN C EM EN TC OM P L.ST A T US R EM A R KS
(N ) CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %
Total - -
Jigawa College of Islamic & Legal
P OST C ON T R A C T P R OJEC T EVA LUA T ION
S/ N . P R OJEC T EXEC UT OR LOC A T ION CONTRACT REVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS
AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %
1 Constr. of Centre for Education Technology at Jigaw a State
College of Islamic & Legal Studies, Ringim DAD A.E. Nig. Ltd. Ringim 38,822,854.32 38,822,854.32 33,525,011.86 2/11/2016 12 w eeks 82 On-going
2 Constr. of Library Complex (phase 1) at College of Islamic and
Legal Studies, Ringim
R & Partners Talatan
Mafara
Ringim 70,000,000.00 70,000,000.00 44,908,143.89 2/2/2017 24 w eeks 64 On-going
Total 108,822,854.32 108,822,854.32
Bilyaminu College of Edo. Hadejia
P OST C ON T R A C T P R OJEC T EVA LUA T ION
S/ N P R OJEC T EXEC UT OR LOC A T ION C ON T R A C T A M OUN T REVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS
(N ) CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %
2
Constr. of Classrooms and Laboratories
complex at Binyaminu Usman Polytechnic,
Hadejia. DAD A.E. Nig. Ltd. Hadejia 82,582,274.72 82,582,274.72 43,106,485.97 5/1/2017 24 weeks 52 On-going
5
Renov ation + Furnishing of Auditorium at Biny aminu
Usman Poly technic Hadejia
Performance Eng. Ltd. Hadejia 47,850,711.06 47,850,711.06 29,799,765.07 29/07/17 8 w eeks 62 On-going
TOTAL 130,432,985.78 130,432,985.78
Min. of Environment
POST CONTRACT PROJECT EVALUATION
S/N PROJECT EXECUTOR LOCATION CONTRACT REVISED VA LUE OF COMMENCEMENT C OM P L. STATUS REMARKS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K DATE P ER IOD IN %
1
Constr of Drainages at Achauya village,
S/Tankarkar Constituency. Sukudai Constr. Nig. Ltd. S/tankarkar 12,017,528.27 12,017,528.27 10,459,494.05 20/11/2017 12 weeks 87 On-going
2
Constr. of Storm Water Drainages at Chamo town
in Dutse LGA (3000M) Loyalty Properties Ltd. Dutse 91,450,000.00 91,450,000.00 24/10/2017 12 weeks On-going
3
Constr. of Storm Water Drainages at Galamawa
town in Dutse LGA (1,600M) Loyalty Properties Ltd. Dutse 48,622,000.00 48,622,000.00 38,570,280.00 24/10/2017 12 weeks 72 On-going
4
Constr. of Storm Water Drainages at Garu town in
Dutse LGA A. Amadu Maikatako Dutse 26,132,000.00 26,132,000.00 24/10/2017 12 weeks On-going
5
Constr. of Storm Water Drainages at Yalleman
town in Kaugama LGA A. Amadu Maikatako Kaugama 56,839,408.01 56,839,408.01 32,382,654.25 24/10/2017 16 weeks
57
On-going
6 Constr. of Drainage at K/fada basirka (phase II) Dazal Nig. Ltd. Gw aram 8,236,789.42 8,236,789.42 7,260,034.95 18/09/2017 8 w eeks
88
On-going
Total 243,297,725.70 243,297,725.70
Jigawa State College of Edu. Gumel
P OST C ON T R A C T P R OJEC T EVA LUA T ION
S/ N . P R OJEC T EXEC UT OR LOC A T ION CONTRACT REVISED VA LUE OF C OM M EN C EM EN T C OM P L. ST A T US R EM A R KS
AMOUNT(N) CONTRACT SUM (N) C ER T IF IED WOR K (N ) D A T E P ER IOD IN %
Total - -
Jigawa College of Info. Tech. Kazaure
P OST C ON T R A C T P R OJEC T EVA LUA T ION
S/ N . P R OJEC T EXEC UT OR LOC A T ION CONTRACT REVISED VA LUE OF C OM M EN C EM EN TC OM P L. ST A T US R EM A R KS
AMOUNT CONTRACT SUM (N) C ER T IF IED WOR K D A T E P ER IOD IN %
1 Constr of 1no. Student Hostel on ex isting foundation at
Informatic Institute Kazaure
Nushe Business
Resources
Kazaure 49,793,055.32 49,793,055.32 41,658,532.65 24/10/2017 8 w eeks 80 On-going
TOTAL 49,793,055.32 49,793,055.32