Page 1: Jijia presentation architectural and building services design

Architectural Design Presentation

Beijing Double Villa – Upgrade to Passive House Refurbishment Standard (EnerPHit) 北京城堡别墅 - 被动式节能建筑优化标准 - 建筑设计与方案更新和咨询

Page 2: Jijia presentation architectural and building services design

TEAMVALLENTIN

Beijing Double Villa – Upgrade to Passive House Refurbishment Standard (EnerPHit)

北京城堡别墅 - 被动式节能建筑优化标准 - 建筑设计与方案更新和咨询

A r c h i t e k t u r W e r k s a t t V a l l e n t i n e G m B H

In 1996, Gernot and Rena Vallentin founded ArchitekturWerkstatt Vallentin GmbH . Since then, they have realized many exemplary Passive House flagship projects within Germany and internationally. Their notable projects includes the world’s first Passive House school (Germany), the Youth Guest House and the LOHAS Seminar Building (Largest Passive House in Korea and Winner of the International Passive House Award 2014) and the recently completed Passive House Experience Center in Qingdao/ China. Both Passive House planners focuses their work on beautiful contemporary design, optimal technical solution and cost effective implementation. They have worked alongside the Passive House Institute and the Bavarian Ministry of Economics to develop the Passive House PLUS Standard for artic and tropical climates, the Building 4.0 Standard. For his work and contributions, Gernot Vallentin has been awarded the ‘Bavarian Environment

S t e f a n o s P a l l a n t z a s

Civil Engineer (NTU Athens, specialized in major project management), Certified Passive House Designer and Accredited Building Certifier, Co-founder and president of the board of the Hellenic Passive House Institute, member of the Affiliates Council of the International Passive House Association (iPHA) and the Scientific Committee of the International Passive House Conference. Accredited Passive House Course Trainer by Passive House Institute In 2009 he successfully completed the first Passive House Standard in Greece. Since then he actively supports new PH projects in several cities in Greece, Cyprus and Turkey and the Mediterranean area. He has made several presentations about the Passive House Standard in

Prof. Dr. Helmuth Gesch

Former Vice-President and scientific director of the Micro Systems Technology Cluster at UAS (University of Applied Sciences) Landshut in Bavaria, Prof. Dr. Helmuth Gesch is an expert in Passive House concepts. He has been involved in Energy Plus Buildings, where Home Automation and Energy Storage systems were integrated to obtain a high level of self-sustaining energy sufficiency. At present, he is actively transferring this modern building concept to the ASEAN region.

Page 3: Jijia presentation architectural and building services design

TEAMVALLENTIN

Beijing Double Villa – Upgrade to Passive House Refurbishment Standard (EnerPHit)

AWV SERVICES & CAPABIL IT IES INCLUDE:

1. Architecture Design 2. Planning for House Services (Ventilation, Heating, Cooling, Dehumidification) 3. Planning for Building Digitalization (building 4.0) 4. Consultation for Architecture, House services and Digitalization 5. Total Project Management (Design to Final Construction) 6. Energy Efficiency Consultation (high level) 7. Best innovated and contemporary Design and Aesthetics 8. Certification for Passive House and Building 4.0 9. New Building and Retrofitting

北京城堡别墅 - 被动式节能建筑优化标准 - 建筑设计与方案更新和咨询

Page 4: Jijia presentation architectural and building services design

CONTENT

1. Refurbishments Design2. PHPP3. Technical Services4. Building 4.05. Materials6. Additional Points of Concern

Beijing Double Villa – Upgrade to Passive House Refurbishment Standard (EnerPHit) 北京城堡别墅 - 被动式节能建筑优化标准 - 建筑设计与方案更新和咨询

Page 5: Jijia presentation architectural and building services design

CONTENT

1. Refurbishment Design

2. PHPP3. Technical Services4. Building 4.05. Materials6. Additional Points of Concern

Page 6: Jijia presentation architectural and building services design

FLOOR PLAN -1F平面图地下一层Beijing Double Villa – Upgrade to Passive House Refurbishment Standard (EnerPHit) 北京城堡别墅 - 被动式节能建筑优化标准 - 建筑设计与方案更新和咨询

Layout vertical pipes: FRESH AIR

Layout vertical pipes: USED AIR

30m³ fresh air volume_IN30m³ used air volume_OUT

Page 7: Jijia presentation architectural and building services design

FLOOR PLAN -1F平面图地下一层Beijing Double Villa – Upgrade to Passive House Refurbishment Standard (EnerPHit) 北京城堡别墅 - 被动式节能建筑优化标准 - 建筑设计与方案更新和咨询

2 ATREA Ventilation system for each villa6000€/piece

1 ATREA Ventilation system for underground8000€/piece

1

2 2

3 energy saving mesure:Motion sensors for regulating heating and ventilation for the underground floor

3

Page 8: Jijia presentation architectural and building services design

FLOOR PLAN GF平面图一楼Beijing Double Villa – Upgrade to Passive House Refurbishment Standard (EnerPHit) 北京城堡别墅 - 被动式节能建筑优化标准 - 建筑设计与方案更新和咨询

Layout vertical pipes: FRESH AIR

Layout vertical pipes: USED AIR

30m³ fresh air volume_IN30m³ used air volume_OUT

Page 9: Jijia presentation architectural and building services design

FLOOR PLAN GF平面图一楼Beijing Double Villa – Upgrade to Passive House Refurbishment Standard (EnerPHit) 北京城堡别墅 - 被动式节能建筑优化标准 - 建筑设计与方案更新和咨询

2 two low temperature Heat Pumps with 500 l storage10.000 €/each

1 vertical shaft for the layout of the installation

1 1

2 2

3 1-2 Fan-Coils each floor for additional active heating and cooling

3 3

Page 10: Jijia presentation architectural and building services design

FLOOR PLAN 1F平面图二楼Beijing Double Villa – Upgrade to Passive House Refurbishment Standard (EnerPHit) 北京城堡别墅 - 被动式节能建筑优化标准 - 建筑设计与方案更新和咨询

Layout vertical pipes: FRESH AIR

Layout vertical pipes: USED AIR

30m³ fresh air volume_IN30m³ used air volume_OUT

Page 11: Jijia presentation architectural and building services design

FLOOR PLAN 1F平面图二楼Beijing Double Villa – Upgrade to Passive House Refurbishment Standard (EnerPHit) 北京城堡别墅 - 被动式节能建筑优化标准 - 建筑设计与方案更新和咨询

1 vertical shaft for the layout of the installation

1 1

3 1-2 Fan-Coils each floor for additional active heating and cooling

3 3

Page 12: Jijia presentation architectural and building services design

FLOOR PLAN 2F平面图顶楼Beijing Double Villa – Upgrade to Passive House Refurbishment Standard (EnerPHit) 北京城堡别墅 - 被动式节能建筑优化标准 - 建筑设计与方案更新和咨询

Layout vertical pipes: FRESH AIR

Layout vertical pipes: USED AIR

30m³ fresh air volume_IN30m³ used air volume_OUT

Page 13: Jijia presentation architectural and building services design

FLOOR PLAN 2F平面图顶楼Beijing Double Villa – Upgrade to Passive House Refurbishment Standard (EnerPHit) 北京城堡别墅 - 被动式节能建筑优化标准 - 建筑设计与方案更新和咨询

1 vertical shaft for the layout of the installation

1 1

3 1-2 Fan-Coils each floor for additional active heating and cooling

3 3

Page 14: Jijia presentation architectural and building services design

V i l l a N o r t hArchitectural changes

VIEW NORTH北立面

1

2

2 window size optimized with bigger glazing proportion

1 Sunshading included in the facade design

Beijing Double Villa – Upgrade to Passive House Refurbishment Standard (EnerPHit) 北京城堡别墅 - 被动式节能建筑优化标准 - 建筑设计与方案更新和咨询

Page 15: Jijia presentation architectural and building services design

V i l l a S o u t hArchitectural changes

VIEW NORTH北立面

12

2 window size optimized with bigger glazing proportion

1 Sunshading included in the facade design

Beijing Double Villa – Upgrade to Passive House Refurbishment Standard (EnerPHit) 北京城堡别墅 - 被动式节能建筑优化标准 - 建筑设计与方案更新和咨询

Page 16: Jijia presentation architectural and building services design

V i l l a N o r t hArchitectural changes

VIEW EAST东立面Beijing Double Villa – Upgrade to Passive House Refurbishment Standard (EnerPHit) 北京城堡别墅 - 被动式节能建筑优化标准 - 建筑设计与方案更新和咨询

1

2

2 window size optimized with bigger glazing proportion

1 Sunshading included in the facade design

Page 17: Jijia presentation architectural and building services design

V i l l a S o u t hArchitectural changes

VIEW EAST东立面Beijing Double Villa – Upgrade to Passive House Refurbishment Standard (EnerPHit) 北京城堡别墅 - 被动式节能建筑优化标准 - 建筑设计与方案更新和咨询

1

2

2 window size optimized with bigger glazing proportion

1 Sunshading included in the facade design

Page 18: Jijia presentation architectural and building services design

V i l l a N o r t hArchitectural changes

VIEW SOUTH南立面Beijing Double Villa – Upgrade to Passive House Refurbishment Standard (EnerPHit) 北京城堡别墅 - 被动式节能建筑优化标准 - 建筑设计与方案更新和咨询

1 2

2 window size optimized with bigger glazing proportion

1 Sunshading included in the facade design

Page 19: Jijia presentation architectural and building services design

V i l l a S o u t hArchitectural changes

VIEW SOUTH南立面Beijing Double Villa – Upgrade to Passive House Refurbishment Standard (EnerPHit) 北京城堡别墅 - 被动式节能建筑优化标准 - 建筑设计与方案更新和咨询

1 2

2 window size optimized with bigger glazing proportion

1 Sunshading included in the facade design

Page 20: Jijia presentation architectural and building services design

V i l l a N O RT HArchitectural changes

VIEW WEST西立面Beijing Double Villa – Upgrade to Passive House Refurbishment Standard (EnerPHit) 北京城堡别墅 - 被动式节能建筑优化标准 - 建筑设计与方案更新和咨询

11 Sunshading included in the facade design

Page 21: Jijia presentation architectural and building services design

V i l l a S O U T HArchitectural changes

VIEW WEST西立面Beijing Double Villa – Upgrade to Passive House Refurbishment Standard (EnerPHit) 北京城堡别墅 - 被动式节能建筑优化标准 - 建筑设计与方案更新和咨询

11 Sunshading included in the facade design

Page 22: Jijia presentation architectural and building services design

SECTION PLAN 1-1剖面图 1-1

Beijing Double Villa – Upgrade to Passive House Refurbishment Standard (EnerPHit) 北京城堡别墅 - 被动式节能建筑优化标准 - 建筑设计与方案更新和咨询

Leading detail

construction detail

Air tightnessInsulation mineral wool

Insulation XPS

Page 23: Jijia presentation architectural and building services design

SECTION PLAN 2-2剖面图 2-2

Beijing Double Villa – Upgrade to Passive House Refurbishment Standard (EnerPHit) 北京城堡别墅 - 被动式节能建筑优化标准 - 建筑设计与方案更新和咨询

Leading detail

construction detail

Air tightnessInsulation mineral wool

Insulation XPS

Page 24: Jijia presentation architectural and building services design

SECTION PLAN 3-3剖面图 3-3

Beijing Double Villa – Upgrade to Passive House Refurbishment Standard (EnerPHit) 北京城堡别墅 - 被动式节能建筑优化标准 - 建筑设计与方案更新和咨询

Leading detail

construction detail

Air tightnessInsulation mineral wool

Insulation XPS

Page 25: Jijia presentation architectural and building services design

CONTENT

1. Refurbishment Design2. PHPP3. Technical Services4. Building 4.05. Materials6. Additional Points of Concern

Page 26: Jijia presentation architectural and building services design

CURRENT PHPP CALCULATION

Beijing Double Villa – Upgrade to Passive House Refurbishment Standard (EnerPHit) 北京城堡别墅 - 被动式节能建筑优化标准 - 建筑设计与方案更新和咨询We have reached a very good building envelop, super insulated, with GOOD QUALITY OF WINDOWS and on the right position and with REDUCED THERMAL BRIDGES. We also expect to improve the AIRTIGHTNESS of the building in order to meet the criteria (1,0 ACH AT N50)

PHPP 计算工具

Page 27: Jijia presentation architectural and building services design

CURRENT PHPP CALCULATION

Beijing Double Villa – Upgrade to Passive House Refurbishment Standard (EnerPHit) 北京城堡别墅 - 被动式节能建筑优化标准 - 建筑设计与方案更新和咨询The designed ventilation system ensures best quality of indoor air, no risk for mold and cold surfaces.We will use three separate units, one bigger for the basement and one for each villa. The recovery efficiency of every unit is more than 80%. All units are combined with a ground heat exchanger system (water brine) and water coils , to preheat (and defrost) and precool the air. Outdoor air will always come into the building in temperatures over 17°C IN WINTER and 27°C IN SUMMER. Average air change of the building will be 0,37 ACH. Expected average CO2 concentrations is around 400-500 PPM.

PHPP 计算工具

Page 28: Jijia presentation architectural and building services design

PHPP_ ENERGY

BALANCE HEATING

Beijing Double Villa – Upgrade to Passive House Refurbishment Standard (EnerPHit) 北京城堡别墅 - 被动式节能建筑优化标准 - 建筑设计与方案更新和咨询

The heating demand is 18 KWh/m²a (with criteria on 25 KWh/m²a) and the heating load is 13W/m² TFA. This doesn‘t allow us to cover the heating of the entire building by preheating the air via the ventilation system. So the additional heating source will be heat pumps.

取暖指数(月算)

Page 29: Jijia presentation architectural and building services design

PHPP_ ENERGY

BALANCE COOLING

Beijing Double Villa – Upgrade to Passive House Refurbishment Standard (EnerPHit) 北京城堡别墅 - 被动式节能建筑优化标准 - 建筑设计与方案更新和咨询

取冷指数(月算)

Also cooling demand and load are very low, so the same heat pumps will cover easily the needs for cooling.

Page 30: Jijia presentation architectural and building services design

USEFUL ENERGY (requirement) and the losses which might occur before this demand is met

Energy losses of DHW pipework

Final energy

Building services Useful energ

y

Water heating DHW

heat requirement

Space heat requirement

Ventilation

Heating

Energy losses of ventilation

ductwork

QDHW

QV Qh,V

Qh,DHW

Qh

Qh,HQH

Energy losses of heating pipes

QDHW

ENERGY FLOW

SCHEME

Beijing Double Villa – Upgrade to Passive House Refurbishment Standard (EnerPHit) 北京城堡别墅 - 被动式节能建筑优化标准 - 建筑设计与方案更新和咨询

能量流动图

Page 31: Jijia presentation architectural and building services design

CONTENT

1. Refurbishment Design2. PHPP3. Technical Services4. Building 4.05. Materials6. Additional Points of Concern

Page 32: Jijia presentation architectural and building services design

Model: ATREA DUPLEX S1100 Flexi

Features:Counterflow heat recovery (up to 93% recovery)Highly efficiency EC FansHigh VariabilityOptional Accessories (heating coils, dampers)

PROPOSED VENTILATION UNIT

Beijing Double Villa – Upgrade to Passive House Refurbishment Standard (EnerPHit) 北京城堡别墅 - 被动式节能建筑优化标准 - 建筑设计与方案更新和咨询

通风设备

Page 33: Jijia presentation architectural and building services design

M O D E L ATREA DUPLEX S1100 Flexi

Features:Counterflow heat recovery (up to 93% recovery)Highly efficiency EC FansHigh VariabilityOptional Accessories (heating coils, dampers)

C O S T 6 000 € /unit

PROPOSED VENTILATION VILLA

Beijing Double Villa – Upgrade to Passive House Refurbishment Standard (EnerPHit) 北京城堡别墅 - 被动式节能建筑优化标准 - 建筑设计与方案更新和咨询

通风设备 别墅

Page 34: Jijia presentation architectural and building services design

M O D E LATREA DUPLEX S1600 Flexi

Features:Counterflow heat recovery (up to 93% recovery)Highly efficiency EC FansHigh VariabilityOptional Accessories (heating coils, dampers)

C O S T 8 000 € /unit

PROPOSED VENTILATION BASEMENT

Beijing Double Villa – Upgrade to Passive House Refurbishment Standard (EnerPHit) 北京城堡别墅 - 被动式节能建筑优化标准 - 建筑设计与方案更新和咨询

通风设备

Page 35: Jijia presentation architectural and building services design

FAN COILS

Fan coils, connected with the heat pumps can be wall or ceiling mounted and will cover heating and cooling of the building.

They are sound proofed systems and with high electricity efficiency.

C O S T 500€ /unit

Beijing Double Villa – Upgrade to Passive House Refurbishment Standard (EnerPHit) 北京城堡别墅 - 被动式节能建筑优化标准 - 建筑设计与方案更新和咨询

趋冷、空调设备

Page 36: Jijia presentation architectural and building services design

PROPOSED HEAT PUMP

Beijing Double Villa – Upgrade to Passive House Refurbishment Standard (EnerPHit) 北京城堡别墅 - 被动式节能建筑优化标准 - 建筑设计与方案更新和咨询

M O D E LDAIKIN Altherma (Low temperature air-to-water heat pump ) with floor heating in the main areas, radiators in the sanitary rooms and fan coils in the rest of the areas.

C O S T 10 000 € /unit

趋热、暖泵设备

Page 37: Jijia presentation architectural and building services design

PROPOSED HEAT PUMP

Beijing Double Villa – Upgrade to Passive House Refurbishment Standard (EnerPHit) 北京城堡别墅 - 被动式节能建筑优化标准 - 建筑设计与方案更新和咨询

A P P L I C AT I O N Two 16KW heat pumps will cover the needs of the building (100% for heating and 100% for DHW.) Two 500l storage tanks will cover the hot water need. During summer the system will support the cooling and if needed DHW.趋热、暖泵设备

Page 38: Jijia presentation architectural and building services design

outdoor air

exhaust air

extract air

supply air

cold water

hot water

HP

Air-to-air plateheat exchanger

post-heater

(=heating coil)

optional:solar hot

water system

If there is option , the heat pump can be ground –water (geothermal) with a much higher COP. Special Calculation has to be made for that.

PROPOSED HEAT PUMP

Beijing Double Villa – Upgrade to Passive House Refurbishment Standard (EnerPHit) 北京城堡别墅 - 被动式节能建筑优化标准 - 建筑设计与方案更新和咨询

趋热、暖泵设备

Page 39: Jijia presentation architectural and building services design

YPipe = 0.14 W/(mK) YPipe = 0.125 W/(mK)

20°C 21°C 22°C 23°C

Installation on unfinished floor slab: not advantageous

Centred in the insulationlayer: better

22°C 21°C

70°C50°C 70°C50°C

© PHI

PROPOSED HEAT PUMP

Beijing Double Villa – Upgrade to Passive House Refurbishment Standard (EnerPHit) 北京城堡别墅 - 被动式节能建筑优化标准 - 建筑设计与方案更新和咨询

趋热、暖泵设备

Page 40: Jijia presentation architectural and building services design

• Monovalent operating method• Drilling requires licensing• Typical output power: 40

W/m• Distributor should be placed

outside (condensate)• Option to close off circuits

separately in order to flush system

• Diffusion resistant insulation of the brine-channel within the building

• Temperature difference ca. 4K• Frost protection at ca. –12 °C

COLD WATER

HOT WATER

HEAT PUMP

FLOOR HEATING

DIRECT GROUND HEAT EXCHANGER

© PHI

HEAT PUMP GEOTHERMAL

PROBE

Beijing Double Villa – Upgrade to Passive House Refurbishment Standard (EnerPHit) 北京城堡别墅 - 被动式节能建筑优化标准 - 建筑设计与方案更新和咨询

暖泵设备 地热探头

Page 41: Jijia presentation architectural and building services design

DEHUMIDI-FICATION

Beijing Double Villa – Upgrade to Passive House Refurbishment Standard (EnerPHit) 北京城堡别墅 - 被动式节能建筑优化标准 - 建筑设计与方案更新和咨询

Climate conditions show that there will be long periods of high humidity. DehumidificationWill be covered by the heating and cooling system and the ventilation, but still areas, especially in the basement and 2nd floors will need additional dehumidification. Efficient dehumidifiers can be installed locally. 除湿设备

Page 42: Jijia presentation architectural and building services design

CONTENT

1. Refurbishment Design2. PHPP3. Technical Services4. Building 4.05. Materials6. Additional Points of Concern

Page 43: Jijia presentation architectural and building services design

WHAT DOES BUILDING 4.0

MEAN?

The term 4.0 implies the 4th technological revolution in building construction

o Basing on ‚Internet of Things‘o Application of internet based

production and communicationo Building construction as well as

building operation compose a decentralised system which is self-learning, self-organised

Energy efficient building structure on highest technology level

o as it is in Passive House Concepto Applicable for all climate zoneso Applicable for all buildings

Building Automations System is the heart of a BUILDING 4.0

o Make the building ‚Smart‘o Applicable for all climate zoneso Applicable for all buildings

Beijing Double Villa – Upgrade to Passive House Refurbishment Standard (EnerPHit) 北京城堡别墅 - 被动式节能建筑优化标准 - 建筑设计与方案更新和咨询

Page 44: Jijia presentation architectural and building services design

Beijing Double Villa – Upgrade to Passive House Refurbishment Standard (EnerPHit) 北京城堡别墅 - 被动式节能建筑优化标准 - 建筑设计与方案更新和咨询SMART BULDING

Page 45: Jijia presentation architectural and building services design

Beijing Double Villa – Upgrade to Passive House Refurbishment Standard (EnerPHit) 北京城堡别墅 - 被动式节能建筑优化标准 - 建筑设计与方案更新和咨询IT BASED SMART HOME

SYSTEMSensoren

Aktoren

Tem

pera

tur

Bewe

gung

Stro

mm

essu

ng

Was

ser,

Feuc

htig

keit

Hellig

keit

Stat

us

Fens

ter/T

üren

Stör

mel

der

Anla

gen

Betri

ebsz

usta

nd

Heizu

ngsv

entil

e)

Raum

bele

ucht

ung

Batteriespeicher

Pufferspeicher

Spannungsversorgungverstärker

Data LoggingInternet

Jalo

usie

n

Scha

lter,

Dim

mer

Zirk

ulat

ions

pum

pe)

Belü

ftung

sanl

age)

Alar

mm

elde

r

Stan

d-by

Abs

chal

tung

Monitoring

Schnittstelle/Interface zum BusBus/hausinternes Netzwerk: KNX, VBUS, MODBUS …

Gara

ge

Mul

timed

ia

Witt

erun

g

Page 46: Jijia presentation architectural and building services design

3 LEVEL OF BUILDING

AUTOMATION

L E V E L 1 : B A S I C

L E V E L 2 : S TA N D A R D

L E V E L 3 : P R E M I U M

No building automation system implementedIsland solutions

Bus network realizedMany components are cross linked

Real BUILDING 4.0Fully automated building

Beijing Double Villa – Upgrade to Passive House Refurbishment Standard (EnerPHit) 北京城堡别墅 - 被动式节能建筑优化标准 - 建筑设计与方案更新和咨询

Page 47: Jijia presentation architectural and building services design

CONTENT

1. Refurbishment Design2. PHPP3. Technical Services4. Building 4.05. Materials6. Additional Points of Concern

Page 48: Jijia presentation architectural and building services design

FACADE WINDOW

Beijing Double Villa – Upgrade to Passive House Refurbishment Standard (EnerPHit) 北京城堡别墅 - 被动式节能建筑优化标准 - 建筑设计与方案更新和咨询

SPECIFICATION

M O D E LEJOT SDF-S plus 8 UB Thickness of insulation up to 220mm

Page 49: Jijia presentation architectural and building services design

FACADE WINDOW

SPECIFICATION

CharacteristicsHigh Thermal InsulationAnti-CondensationImpact-ResistantFrost-ResistantNoise Reduction Heat Conductivity:0,12 W/mK

Density: 500kg/m3

Vapour-Resistance factor, μ: 10

Beijing Double Villa – Upgrade to Passive House Refurbishment Standard (EnerPHit) 北京城堡别墅 - 被动式节能建筑优化标准 - 建筑设计与方案更新和咨询

Page 50: Jijia presentation architectural and building services design

FACADECURTAIN WALL

SPECIFICATION

CharacteristicsHigh Thermal InsulationAnti-CondensationImpact-ResistantFrost-ResistantNoise Reduction Heat Conductivity:0,12 W/mK

Density: 500kg/m3

Vapour-Resistance factor, μ: 10

Beijing Double Villa – Upgrade to Passive House Refurbishment Standard (EnerPHit) 北京城堡别墅 - 被动式节能建筑优化标准 - 建筑设计与方案更新和咨询

Page 51: Jijia presentation architectural and building services design

FACADEBASEBOARD

SPECIFICATION

M O D E LStoVentec

CHARACTERISTICSLightweightFlame-ResistantImpact-ResistantFrost-ResistantNoise Reduction

DIMENSTIONS1200*800*10 mm2400*1200*12 mm

HEAT CONDUCTIVITY0,09 W/mK DENSITY500kg/m3

Beijing Double Villa – Upgrade to Passive House Refurbishment Standard (EnerPHit) 北京城堡别墅 - 被动式节能建筑优化标准 - 建筑设计与方案更新和咨询

1. Insulation2. underconstruction3. baseboard4. Base coating5. flush mounting6. reinforcement7. glue8. clinker

Page 52: Jijia presentation architectural and building services design

FACADEANCHOR

SPECIFICATION

M O D E LStoR 1,5 & 2,5

CHARACTERISTICS

LACK OF HEAT BRIDGE Δ UWB < 0,025 W/(m²K)

C O M F O RTθ i,min > 17,00 °C

Beijing Double Villa – Upgrade to Passive House Refurbishment Standard (EnerPHit) 北京城堡别墅 - 被动式节能建筑优化标准 - 建筑设计与方案更新和咨询

1. Thermal seperation2. Anchoring3. Wall bracket4. Thermal seperation5. T-profile

Page 53: Jijia presentation architectural and building services design

PASSIVE HOUSE CERTIFICATION

• CONSULTING• BENEFIT • SAFETY• CONFIDENCE

BENEFITSBeijing Double Villa – Upgrade to Passive House Refurbishment Standard (EnerPHit) 北京城堡别墅 - 被动式节能建筑优化标准 - 建筑设计与方案更新和咨询