Just – In - TimeJust – In - Time
JITJIT
April 7, 2023April 7, 2023 Prof. Vivek KumarProf. Vivek Kumar 22
TAIICHI OHNOTAIICHI OHNO
Born in 1912, Taiichi Ohno who Born in 1912, Taiichi Ohno who joined TOYOTA in 1943 and then joined TOYOTA in 1943 and then went about realising Toyada went about realising Toyada Kiichiro (1894 – 1952)’s dream to Kiichiro (1894 – 1952)’s dream to catch up with America in three catch up with America in three years. Otherwise, the automobile years. Otherwise, the automobile industry of Japan will not survive.industry of Japan will not survive.
Creator of Just-In-Time
April 7, 2023April 7, 2023 Prof. Vivek KumarProf. Vivek Kumar 33
TAIICHI OHNOTAIICHI OHNO
At the time of Japanese surrender At the time of Japanese surrender on August 15, 1945. Taiichi Ohno on August 15, 1945. Taiichi Ohno who was working with Toyota who was working with Toyota Motor Company found out that the Motor Company found out that the productivity of Japanese to productivity of Japanese to American worker was 1:9.American worker was 1:9.
Creator of Just-In-Time
April 7, 2023April 7, 2023 Prof. Vivek KumarProf. Vivek Kumar 44
TAIICHI OHNOTAIICHI OHNO
To bridge this gap, they set about To bridge this gap, they set about working on developing the new working on developing the new system on two pillars:system on two pillars:
Just – In – TimeJust – In – Time AutonomationAutonomation(automation with a human touch)(automation with a human touch)
Creator of Just-In-Time
April 7, 2023April 7, 2023 Prof. Vivek KumarProf. Vivek Kumar 55
Just-in-Time LogicJust-in-Time Logic
Nothing is produced until it is Nothing is produced until it is needed. Need is created by needed. Need is created by demand. In theory, when an item is demand. In theory, when an item is sold, the market pulls another item sold, the market pulls another item from the last position in the system, from the last position in the system, this triggers an order to the this triggers an order to the production line, where the worker production line, where the worker pulls another item from an upstream pulls another item from an upstream station to replace the item taken.station to replace the item taken.
April 7, 2023April 7, 2023 Prof. Vivek KumarProf. Vivek Kumar 66
JIT demands a high levels of JIT demands a high levels of quality at each stage of the quality at each stage of the process, strong vendor relations process, strong vendor relations and predictable demand for the and predictable demand for the end product.end product.
Just-in-Time LogicJust-in-Time Logic
April 7, 2023April 7, 2023 Prof. Vivek KumarProf. Vivek Kumar 77
DefinitionDefinition
A Structural approach in a A Structural approach in a manufacturing organization manufacturing organization focused on improving Timeliness, focused on improving Timeliness, Quality, Productivity and Flexibility Quality, Productivity and Flexibility utilizing various methods of Work utilizing various methods of Work Simplification and Waste Simplification and Waste Reduction.Reduction.
Shigeo Shingo
April 7, 2023April 7, 2023 Prof. Vivek KumarProf. Vivek Kumar 88
TAIICHI OHNOTAIICHI OHNO
Originator of JIT philosophy and Originator of JIT philosophy and the man behind the success of the man behind the success of ‘TOYOTA’ relentlessly pursued for ‘TOYOTA’ relentlessly pursued for total elimination of waste. He total elimination of waste. He identified the following seven identified the following seven wastes:wastes:
April 7, 2023April 7, 2023 Prof. Vivek KumarProf. Vivek Kumar 99
Seven WastesSeven Wastes
1.1. Waste arising from Waste arising from overproducing.overproducing.
2.2. Waste arising from time on Waste arising from time on hand (waiting).hand (waiting).
3.3. Waste arising from Waste arising from transporting.transporting.
4.4. Waste arising from processing Waste arising from processing itself.itself.
April 7, 2023April 7, 2023 Prof. Vivek KumarProf. Vivek Kumar 1010
Seven WastesSeven Wastes
5.5. Waste arising from Waste arising from unnecessary stock on hand.unnecessary stock on hand.
6.6. Waste arising from Waste arising from unnecessary motion.unnecessary motion.
7.7. Waste arising from producing Waste arising from producing defective goods.defective goods.
April 7, 2023April 7, 2023 Prof. Vivek KumarProf. Vivek Kumar 1111
Principles of HousekeepingPrinciples of Housekeeping
The 5 S’s:The 5 S’s: Proper Selection Proper Selection (SERI)(SERI) Proper Arrangement Proper Arrangement (SEITON)(SEITON) Cleaning Cleaning (SEISO)(SEISO) Cleanliness Cleanliness (SEIKETSU)(SEIKETSU) Self Discipline Self Discipline (SHITSUKE)(SHITSUKE)
April 7, 2023April 7, 2023 Prof. Vivek KumarProf. Vivek Kumar 1212
JIT’s PresumptionsJIT’s Presumptions
The importance of JIT is to The importance of JIT is to eliminate waste. The main objective eliminate waste. The main objective is to develop a system that allows a is to develop a system that allows a manufacturer to have only the manufacturer to have only the materials, equipment and people on materials, equipment and people on hand required to do a job. However, hand required to do a job. However, the system presupposes that in the system presupposes that in order to achieve its goals order to achieve its goals companies will try to fulfill the companies will try to fulfill the objective requirements such as:objective requirements such as:
April 7, 2023April 7, 2023 Prof. Vivek KumarProf. Vivek Kumar 1313
JIT’s PresumptionsJIT’s Presumptions
Vertical integration and optimizing Vertical integration and optimizing the step of manufacturing process.the step of manufacturing process. Processing quality products.Processing quality products. Low cost operation with its Low cost operation with its advanced technology machinery.advanced technology machinery. Producing product based on Producing product based on demand.demand.
April 7, 2023April 7, 2023 Prof. Vivek KumarProf. Vivek Kumar 1414
JIT’s PresumptionsJIT’s Presumptions
Manufacturing flexibility.Manufacturing flexibility. Good reputation with suppliers & Good reputation with suppliers & customers.customers. Spotlighting improvement areas.Spotlighting improvement areas.
April 7, 2023April 7, 2023 Prof. Vivek KumarProf. Vivek Kumar 1515
JIT ManufacturingJIT Manufacturing
Keeps inventory low or at 0.Keeps inventory low or at 0. Raw materials (only enough to Raw materials (only enough to supply 1supply 1stst step in process). step in process). Each Station in succession Each Station in succession produces enough for the next produces enough for the next Station.Station. Final Product Inventory enough Final Product Inventory enough to supply customer requests.to supply customer requests.
April 7, 2023April 7, 2023 Prof. Vivek KumarProf. Vivek Kumar 1616
JIT MethodsJIT Methods
1.1. Elimination of WasteElimination of Waste2.2. Good HousekeepingGood Housekeeping3.3. Visual ControlVisual Control4.4. Jidoka / Andon / PokayokeJidoka / Andon / Pokayoke5.5. Machine Total Productive Machine Total Productive
MaintenanceMaintenance6.6. Material Handling / Material Handling /
TransportationTransportation
April 7, 2023April 7, 2023 Prof. Vivek KumarProf. Vivek Kumar 1717
JIT MethodsJIT Methods
7.7. Set – up reductionSet – up reduction8.8. Demand Pull + KANBANDemand Pull + KANBAN9.9. SchedulingScheduling10.10. Supplier RelationsSupplier Relations11.11. Traditional Batch vs. JITTraditional Batch vs. JIT
April 7, 2023April 7, 2023 Prof. Vivek KumarProf. Vivek Kumar 1818
JIT and Lean ManagementJIT and Lean Management JIT can be divided into two terms: JIT can be divided into two terms:
“Big JIT” and “Little JIT”“Big JIT” and “Little JIT” Big JITBig JIT (also called (also called Lean Lean
ManagementManagement) is a philosophy of ) is a philosophy of operations management that seeks to operations management that seeks to eliminate waste in all aspects of a eliminate waste in all aspects of a firm’s production activities: human firm’s production activities: human relations, vendor relations, relations, vendor relations, technology, and the management of technology, and the management of materials and inventorymaterials and inventory
Little JITLittle JIT focuses more narrowly on focuses more narrowly on scheduling goods inventory and scheduling goods inventory and providing service resources where providing service resources where and when neededand when needed
April 7, 2023April 7, 2023 Prof. Vivek KumarProf. Vivek Kumar 1919
JIT Demand-Pull LogicJIT Demand-Pull Logic
Customers
Sub
Sub
Fab
Fab
Fab
Fab
Vendor
Vendor
Vendor
Vendor
Final Assembly
Here the customer starts the process, pulling an inventory item from Final Assembly…
Then sub-assembly work is pulled forward by that demand…
The process continues throughout the entire production process and supply chain
April 7, 2023April 7, 2023 Prof. Vivek KumarProf. Vivek Kumar 2020
Minimizing Waste: Focused Minimizing Waste: Focused Factory NetworksFactory Networks
CoordinationSystem Integration
These are small specialized plants that limit the range of products produced (sometimes only one type of product for an entire facility)
Some plants in Japan have as few as 30 and as many as 1000 employees
April 7, 2023April 7, 2023 Prof. Vivek KumarProf. Vivek Kumar 2121
Minimizing Waste: Minimizing Waste: Group TechnologyGroup Technology (Part 1)(Part 1)
Using Using Departmental SpecializationDepartmental Specialization for plant layout can cause a lot of for plant layout can cause a lot of unnecessary material movement unnecessary material movement
Saw Saw
Lathe PressPress
Grinder
LatheLathe
Saw
Press
Heat Treat
Grinder
Note how the flow lines are going back and forth
Minimizing Waste: Group Technology Minimizing Waste: Group Technology (Part 2)(Part 2)
Revising by using Revising by using Group Technology CellsGroup Technology Cells can reduce movement and can reduce movement and improve product flow improve product flow
Press
Lathe
Grinder
Grinder
A
2
BSaw
Heat Treat
LatheSaw Lathe
PressLathe
1
April 7, 2023April 7, 2023 Prof. Vivek KumarProf. Vivek Kumar 2323
Minimizing Waste: Minimizing Waste: Uniform Plant Loading (heijunka)Uniform Plant Loading (heijunka)
Not uniform Jan. Units Feb. Units Mar. Units Total
1,200 3,500 4,300 9,000
Uniform Jan. Units Feb. Units Mar. Units Total
3,000 3,000 3,000 9,000
Suppose we operate a production plant that produces a single product. The schedule of production for this product could be accomplished using either of the two plant loading schedules below.
How does the uniform loading help save labor costs?
or
April 7, 2023April 7, 2023 Prof. Vivek KumarProf. Vivek Kumar 2424
Minimizing Waste: Just-In-Time Minimizing Waste: Just-In-Time ProductionProduction
• Management philosophy• “Pull” system though the plant
WHAT IT IS
• Employee participation• Industrial engineering/basics• Continuing improvement• Total quality control• Small lot sizes
WHAT IT REQUIRES
• Attacks waste• Exposes problems and bottlenecks• Achieves streamlined production
WHAT IT DOES
• Stable environment
WHAT IT ASSUMES
Minimizing Waste: Inventory Minimizing Waste: Inventory Hides ProblemsHides Problems
Work inprocess queues(banks)
Changeorders
Engineering designredundancies
Vendordelinquencies
Scrap
Designbacklogs
Machine downtime
Decisionbacklogs
Inspectionbacklogs
Paperworkbacklog
Example: By identifying defective items from a vendor early in the production process the downstream work is saved
Example: By identifying defective work by employees upstream, the downstream work is saved
Minimizing Waste: Kanban Minimizing Waste: Kanban Production Control SystemsProduction Control Systems
Storage Part A
Storage Part AMachine
Center Assembly Line
Material Flow
Card (signal) Flow
Withdrawal kanban
Once the Production kanban is received, the Machine Center produces a unit to replace the one taken by the Assembly Line people in the first place
This puts the system back were it was before the item was pulled
The process begins by the Assembly Line people pulling Part A from Storage
Production kanban
April 7, 2023April 7, 2023 Prof. Vivek KumarProf. Vivek Kumar 2727
Determining the Number of Kanbans Determining the Number of Kanbans NeededNeeded Setting up a kanban system Setting up a kanban system
requires determining the number requires determining the number of kanbans cards (or containers) of kanbans cards (or containers) neededneeded
Each container represents the Each container represents the minimum production lot sizeminimum production lot size
An accurate estimate of the lead An accurate estimate of the lead time required to produce a time required to produce a container is key to determining container is key to determining how many kanbans are requiredhow many kanbans are required
April 7, 2023April 7, 2023 Prof. Vivek KumarProf. Vivek Kumar 2828
The Number of Kanban Card SetsThe Number of Kanban Card Sets
CSDL
k
)(1
container theof SizestockSafety timelead during demand Expected
k = Number of kanban card sets (a set is a card)D = Average number of units demanded over some time periodL = lead time to replenish an order (same units of time as demand)S = Safety stock expressed as a percentage of demand during leadtimeC = Container size
April 7, 2023April 7, 2023 Prof. Vivek KumarProf. Vivek Kumar 2929
Example of Kanban Card Example of Kanban Card Determination: Problem DataDetermination: Problem Data A switch assembly is assembled in A switch assembly is assembled in
batches of 4 units from an “upstream” batches of 4 units from an “upstream” assembly area and delivered in a special assembly area and delivered in a special container to a “downstream” control-container to a “downstream” control-panel assembly operationpanel assembly operation
The control-panel assembly area The control-panel assembly area requires 5 switch assemblies per hourrequires 5 switch assemblies per hour
The switch assembly area can produce a The switch assembly area can produce a container of switch assemblies in 2 container of switch assemblies in 2 hourshours
Safety stock has been set at 10% of Safety stock has been set at 10% of needed inventoryneeded inventory
April 7, 2023April 7, 2023 Prof. Vivek KumarProf. Vivek Kumar 3030
Example of Kanban Card Determination: Example of Kanban Card Determination: CalculationsCalculations
3or ,75.24
5(2)(1.1))(1
container theof SizestockSafety timelead during demand Expected
CSDL
k
Always round up!
April 7, 2023April 7, 2023 Prof. Vivek KumarProf. Vivek Kumar 3131
Respect for PeopleRespect for People
Level payrollsLevel payrolls
Cooperative employee unionsCooperative employee unions
Subcontractor networksSubcontractor networks
Bottom-round management styleBottom-round management style
Quality circles (Small Group Quality circles (Small Group Involvement Activities or SGIA’s)Involvement Activities or SGIA’s)
April 7, 2023April 7, 2023 Prof. Vivek KumarProf. Vivek Kumar 3232
Toyota Production System’s Four Toyota Production System’s Four RulesRules
1.1. All work shall be highly specified as to All work shall be highly specified as to content, sequence, timing, and outcomecontent, sequence, timing, and outcome
2.2. Every customer-supplier connection Every customer-supplier connection must be direct, and there must be an must be direct, and there must be an unambiguous yes-or-no way to send unambiguous yes-or-no way to send requests and receive responsesrequests and receive responses
3.3. The pathway for every product and The pathway for every product and service must be simple and directservice must be simple and direct
4.4. Any improvement must be made in Any improvement must be made in accordance with the scientific method, accordance with the scientific method, under the guidance of a teacher, at the under the guidance of a teacher, at the lowest possible level in the organization lowest possible level in the organization
April 7, 2023April 7, 2023 Prof. Vivek KumarProf. Vivek Kumar 3333
JIT Implementation Requirements: JIT Implementation Requirements: Design Flow ProcessDesign Flow Process Link operationsLink operations Balance workstation capacities Balance workstation capacities Redesign layout for flow Redesign layout for flow Emphasize preventive Emphasize preventive
maintenance maintenance Reduce lot sizes Reduce lot sizes Reduce setup/changeover time Reduce setup/changeover time
April 7, 2023April 7, 2023 Prof. Vivek KumarProf. Vivek Kumar 3434
JIT Implementation Requirements: JIT Implementation Requirements: Total Quality ControlTotal Quality Control
Worker responsibility Worker responsibility
Measure SQC Measure SQC
Enforce compliance Enforce compliance
Fail-safe methods Fail-safe methods
Automatic inspectionAutomatic inspection
April 7, 2023April 7, 2023 Prof. Vivek KumarProf. Vivek Kumar 3535
JIT Implementation Requirements: JIT Implementation Requirements: Stabilize ScheduleStabilize Schedule
Level schedule Level schedule
Underutilize capacityUnderutilize capacity
Establish freeze windowsEstablish freeze windows
April 7, 2023April 7, 2023 Prof. Vivek KumarProf. Vivek Kumar 3636
JIT Implementation Requirements: JIT Implementation Requirements: Kanban-PullKanban-Pull
Demand pull Demand pull
Backflush Backflush
Reduce lot sizesReduce lot sizes
April 7, 2023April 7, 2023 Prof. Vivek KumarProf. Vivek Kumar 3737
JIT Implementation Requirements: JIT Implementation Requirements: Work with VendorsWork with Vendors
Reduce lead times Reduce lead times
Frequent deliveries Frequent deliveries
Project usage requirements Project usage requirements
Quality expectations Quality expectations
April 7, 2023April 7, 2023 Prof. Vivek KumarProf. Vivek Kumar 3838
JIT Implementation Requirements: JIT Implementation Requirements: Reduce Inventory MoreReduce Inventory More
Look for other areasLook for other areas
Stores Stores
TransitTransit
CarouselsCarousels
Conveyors Conveyors
April 7, 2023April 7, 2023 Prof. Vivek KumarProf. Vivek Kumar 3939
JIT Implementation Requirements: JIT Implementation Requirements: Improve Product DesignImprove Product Design
Standard product Standard product configuration configuration
Standardize and reduce Standardize and reduce number of partsnumber of parts
Process design with product Process design with product design design
Quality expectationsQuality expectations
April 7, 2023April 7, 2023 Prof. Vivek KumarProf. Vivek Kumar 4040
JIT Implementation Requirements: JIT Implementation Requirements: Concurrently Solve ProblemsConcurrently Solve Problems
Root causeRoot cause Solve permanentlySolve permanently
Team approachTeam approach
Line and specialist Line and specialist responsibilityresponsibility
Continual education Continual education
April 7, 2023April 7, 2023 Prof. Vivek KumarProf. Vivek Kumar 4141
JIT Implementation Requirements: JIT Implementation Requirements: Measure PerformanceMeasure Performance
Emphasize Emphasize
improvement improvement Track trendsTrack trends
April 7, 2023April 7, 2023 Prof. Vivek KumarProf. Vivek Kumar 4242
JIT in Services (Examples)JIT in Services (Examples)
Organize Problem-Solving GroupsOrganize Problem-Solving Groups
Upgrade HousekeepingUpgrade Housekeeping
Upgrade QualityUpgrade Quality
Clarify Process FlowsClarify Process Flows
Revise Equipment and Process Revise Equipment and Process Technologies Technologies
April 7, 2023April 7, 2023 Prof. Vivek KumarProf. Vivek Kumar 4343
JIT in Services (Examples)JIT in Services (Examples)
Level the Facility LoadLevel the Facility Load
Eliminate Unnecessary ActivitiesEliminate Unnecessary Activities
Reorganize Physical Reorganize Physical ConfigurationConfiguration
Introduce Demand-Pull Introduce Demand-Pull SchedulingScheduling
Develop Supplier Networks Develop Supplier Networks
April 7, 2023April 7, 2023 Prof. Vivek KumarProf. Vivek Kumar 4444
JIT PeopleJIT People
Accept only 0 PPM quality Accept only 0 PPM quality rejection.rejection.
Are not passive witness.Are not passive witness. Keep the flow.Keep the flow. Continually suggest Continually suggest
improvement.improvement. Are interested in production.Are interested in production.
April 7, 2023April 7, 2023 Prof. Vivek KumarProf. Vivek Kumar 4545
JIT PeopleJIT People
Know how to do their jobs.Know how to do their jobs. Know how to do other’s jobs.Know how to do other’s jobs. Can stop the line.Can stop the line. Assist their compatriots.Assist their compatriots. Predict and avoid problems.Predict and avoid problems. Measure their own output.Measure their own output.
April 7, 2023April 7, 2023 Prof. Vivek KumarProf. Vivek Kumar 4646
JIT PeopleJIT People
Measure their own quality.Measure their own quality. Understand the product / Understand the product /
process.process. Call in resources as needed.Call in resources as needed. Are team players and team Are team players and team
leaders.leaders.
April 7, 2023April 7, 2023 Prof. Vivek KumarProf. Vivek Kumar 4747
JIT in SubcontractingJIT in Subcontracting
LocationLocation VolumeVolume ClubbingClubbing QualityQuality ResponsivenessResponsiveness Shelf lifeShelf life Cycle TimeCycle Time Forecast AccuracyForecast Accuracy Movement Constraints.Movement Constraints.