j:msu classroom remodel0.2 revit modelsreid … 302 301 304 305 306 308 309 310 311 312 313 314 355...

11
350 349 348 347 346 345 344 343 342 341 340 339 338 337 359 330 356 352 333 333A 332C 333C 333B 332 334B 334 334A 360 335 329 328 327 326 325 324 323 316 317 318 319 320 321 322 315 314A 358 351 353 354 357 361 362 303 302 301 304 305 306 308 309 310 311 312 313 314 355 UP DN DN DN UP UP DN ROOF OVER CLASSES BELOW UP UP REID 333 - 332 PROJECT LOCATION 720 S. Tracy Ave., Bozeman, MT dRA-Architect.com dRA dennis Raffensperger Architect REV. DESCRIPTION DATE REVIEWED BY: DRAWN BY: SHEET DATE SHEET TITLE MONTANA STATE UNIVERSITY MSU-CPDC MONTANA STATE UNIVERSITY BOZEMAN, MONTANA PHONE: 406.994.5413 FAX: 406.994.5665 Consultant #: 1710 CLASSROOM RENOVATIONS 2018 REID HALL 332-333 100% CONSTRUCTION DRAWINGS Mosaic DRA COVER A000 03/19/2018 PROJECT #2 PPA#18-2012 CLASSROOM RENOVATIONS 2018 ADDRESS: MONTANA STATE UNIVERSITY BOZEMAN, MT 59717 PROJECT DIRECTORY PROJECT #2 CLASSROOM: REID HALL 332&333 MECHANICAL/ELECTRICAL/ PLUMBING ENGINEERING: 2880 TECHNOLOGY BLVD. WEST P.O. BOX 1113 BOZEMAN, MT 59771 - 1113 (406) 587 - 0721 CONTACT: Erik Renna, P.E. erenna@m - m.net 1" = 20'-0" REF: 1/ A200 REID HALL THIRD FLOOR VICINITY MAP 1 ARCHITECTURAL SHEETS A000 COVER A001 GENERAL INFORMATION A002 CODE INFORMATION A100 DEMO PLANS A101 FLOOR PLAN & REFLECTED CEILING PLANS & DETAILS A200 ELEVATIONS A500 TYPICAL DETAILS ARCHITECT: MOSAIC ARCHITECTURE, P.C. 428 North Last Chance Gulch Helena, MT 59601 Ph. 406 - 449 - 2013, CONTACT(S) : Matt Aune, [email protected] 720 S. TRACEY AVE BOZEMAN, MT (406) 581 - 8759 CONTACT: DENNIS RAFFENSPERGER AIA dennis@dra - architect.com dRA d ennis R affensperger A rchitect CONSULTING ARCHITECT: MEP SHEETS E100 ELECTRICAL LIGHTING PLAN E200 ELECTRICAL POWER & SIGNAL PLAN M100 MECHANICAL PLAN

Upload: phamhuong

Post on 15-May-2018

246 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: J:MSU CLASSROOM REMODEL0.2 Revit ModelsReid … 302 301 304 305 306 308 309 310 311 312 313 314 355 UP DN DN UP UP DN ROOF OVER CLASSES BELOW UP UP REID 333-332 PROJECT LOCATION dRA

350349 348 347 346 345 344 343 342 341 340 339 338 337

359

330 356

352

333

333A

332C

333C 333B

332

334B 334

334A 360

335

329328 327 326 325 324 323 316317318319320321322 315 314A

358

351

353

354

357

361 362

303

302

301

304

305

306

308

309

310

311

312

313

314

355

UP

DN

DNDNUP

UP DN

ROOF OVERCLASSESBELOW

UP

UP

REID 333-332

PROJECT LOCATION

72

0 S

. Tr

acy

Ave

., B

ozem

an, M

T

dRA-

Arc

hite

ct.c

om

dRA

den

nis

Raf

fens

perg

erArc

hite

ct

REV. DESCRIPTION DATE

REVIEWED BY:DRAWN BY:

SHEET

DATE

SHEET TITLE

MO

NT

AN

AST

AT

E U

NIV

ER

SIT

Y

MSU-CPDCMONTANA STATE UNIVERSITY

BOZEMAN, MONTANAPHONE: 406.994.5413

FAX: 406.994.5665

Consultant #:1710

CL

ASS

RO

OM

RE

NO

VA

TIO

NS

2018

REI

D H

ALL

33

2-3

33

10

0%

CO

NS

TRU

CTI

ON

DR

AW

ING

S

MosaicDRA

COVER

A00003/19/2018

PR

OJE

CT

#2

PPA#18-2012

CLASSROOM RENOVATIONS 2018

ADDRESS:MONTANA STATE UNIVERSITY

BOZEMAN, MT 59717

PROJECT DIRECTORY

PROJECT #2CLASSROOM: REID HALL 332&333

MECHANICAL/ELECTRICAL/PLUMBING ENGINEERING:

2880 TECHNOLOGY BLVD. WESTP.O. BOX 1113BOZEMAN, MT 59771-1113(406) 587-0721

CONTACT: Erik Renna, [email protected]

1" = 20'-0" REF: 1/ A200

REID HALL THIRD FLOOR VICINITY MAP1

ARCHITECTURAL SHEETS

A000 COVERA001 GENERAL INFORMATIONA002 CODE INFORMATIONA100 DEMO PLANSA101 FLOOR PLAN & REFLECTED CEILING PLANS & DETAILSA200 ELEVATIONSA500 TYPICAL DETAILS

ARCHITECT:

MOSAIC ARCHITECTURE, P.C.428 North Last Chance GulchHelena, MT 59601Ph. 406-449-2013,

CONTACT(S) : Matt Aune, [email protected]

720 S. TRACEY AVEBOZEMAN, MT (406) 581-8759

CONTACT: DENNIS RAFFENSPERGER [email protected]

dRAdennis Raffensperger Architect

CONSULTING ARCHITECT:

MEP SHEETSE100 ELECTRICAL LIGHTING PLANE200 ELECTRICAL POWER & SIGNAL PLANM100 MECHANICAL PLAN

Page 2: J:MSU CLASSROOM REMODEL0.2 Revit ModelsReid … 302 301 304 305 306 308 309 310 311 312 313 314 355 UP DN DN UP UP DN ROOF OVER CLASSES BELOW UP UP REID 333-332 PROJECT LOCATION dRA

REFERENCE SYMBOLS:

SCALE

SECTIONS / WALL SECTIONS

INTERIOR ELEVATIONS

DETAIL CALLOUT

ROOM NAME, NUMBER, AND AREA

GRID LINES:NUMBERS LEFT TO RIGHTLETTERS TOP TO BOTTOM

ELEVATION TAG,TYP. MAIN FLOOR = 100' - 0"

DRAWING TITLE

FIRE EXTINGUISHER, SEE CODE PLANS

SHEET NUMBER

DRAWING NUMBER

SHEET NUMBER

DRAWING NUMBER

SHEET NUMBER

DRAWING NUMBER

FE

FE

WITH CABINET

WALL-HUNG, NO CABINET

A1-01

13

13

13

13

View Name1/8" = 1'-0"23

1

A101 SIM

A101

1

SIM

Room name

150 SF101

##

##

NameElevation1

A101 SIM

Room name

101150 SF

1. GENERAL CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND ALL CONDITIONS OF THE EXISTING SITE.

2. RESPONSIBILITY FOR ON-SITE COORDINATION OF CONSTRUCTION ACTIVITIES IS WITH THE GENERAL CONTRACTOR.

3. ALL SHOP DRAWING DIMENSIONS TO BE CHECKED AND VERIFIED IN THE FIELD BY THE CONTRACTOR WHO WILL BE RESPONSIBLE FOR SAME.

4. GENERAL CONTRACTOR IS RESPONSIBLE FOR PATCHING OF ANY SURFACES DAMAGED DURING THE CONSTRUCTION PROCESSES. SURFACES ARE TO BE PATCHED FLUSH WITH EXISTING. MATCH EXISTING ADJACENT FINISH OR APPLY NEW FINISH AS SCHEDULED.

5. GENERAL CONTRACTOR TO COORDINATE ALL CUTTING AND PATCHING REQUIRED BY WORK OF ALL TRADES AND AS APPROVED BY ARCHITECT/ ENGINEER.

6. GENERAL CONTRACTOR TO PROVIDE ALL REQUIRED BLOCKING, ANCHORAGES FOR ACCESSORIES, MILLWORK, TRIM, GRAB BARS, CABINETS, SHELVING, TOILET ACCESSORIES, HANDRAILS, OTHER FLUSH OR SEMI-RECESSED EQUIPMENT, MECHANICAL AND ELECTRICAL ITEMS, OR AS SPECIFIED.

7. IN GENERAL, REPETITIVE DETAILS DRAWN ARE SHOWN IN FULL ONLY ONCE. REPETITIONS MAY NOT BE COMPLETE IN EVERY DETAIL AS SHOWN IN THE ORIGINAL DETAIL.

8. PARTITIONS ARE LOCATED BY ONE OF THE FOLLOWING METHODS:9. a) WHERE POSSIBLE, BY RELATIONSHIP TO ADJACENT STRUCTURE.10. b) TYPICAL RELATIONSHIP TO LARGE SCALE DETAILS.11. c) BY DIMENSION FROM STRUCTURE OR PARTITION ALREADY LOCATED.12. d) BY DIMENSION FROM GRID LINES.13. e) DIMENSIONS ARE TO FACE OF STUD.14. DIMENSIONS ARE SHOWN ON THE DRAWINGS. DO NOT SCALE THE DRAWINGS.15. ALL HEIGHTS ARE DIMENSIONED FROM THE TOP OF SUBFLOOR UNLESS NOTED OTHERWISE.16. EDGE TRIM AROUND ALL EDGES OF GYPSUM BOARD WALLS ABUTTING OTHER MATERIALS. LEAVE

1/4" GAP FROM WALL FOR SEALANT.17. WHERE COLUMNS AND STUD WALLS ALIGN, GYPSUM BOARD TO BE CONTINUOUS OVER COLUMNS

OR BOXED AROUND COLUMN IF COLUMN PROJECTS BEYOND WALL.18. GYPSUM BOARD IN TOILET AREAS AND OTHER AREAS INDICATED AS "WET AREAS" TO BE WATER

RESISTANT GYPSUM BOARD.19. BRING TO THE ATTENTION OF THE ARCHITECT ANY CONDITION OR AREA OF FINISH THAT IS IN

QUESTION OR NOT NOTED.20. SEAL OPENINGS IN FLOOR AROUND DUCTS, PIPES, VENTS, SOILPIPES, TRAPS, CONDUIT, ETC.

ACCORDING TO DETAILS & SPECIFICATIONS.21. ALL PENETRATIONS THROUGH WALLS ABOVE CEILING AND BELOW STRUCTURE ARE TO BE CLOSED

TIGHT AROUND PENETRATION. USE FIRESAFING WHERE FIRE-RATED WALLS AND FLOOR/CEILINGS ARE PENETRATED. SEE DETAILS AND SPECIFICATIONS.

22. DUST BARRIERS MUST BE INSTALLED WHEREVER NEW WORK IS ADJACENT TO OCCUPIED AREAS. BARRIERS MUST BE SEALED TO INSURE NO DUST TRANSMISSION TO OCCUPIED SPACES.

23. CONTRACTOR TO VERIFY ALL EQUIPMENT SIZES AND ROUGH-IN NEEDS AND ADJUST TO EXISTING CONDITIONS PRIOR TO BEGINNING WORK.

24. SEE MECHANICAL & ELECTRICAL FOR ADDITIONAL PLACEMENT OF SLEEVES & HANGERS REQUIRED BY WORK.

25. ALL MECHANICAL AND ELECTRICAL LINES TO BE INSTALLED TIGHT TO STRUCTURE WHERE POSSIBLE.

26. HEATING, PLUMBING AND ELECTRICAL PLANS WHERE SHOWN DIAGRAMMATICALLY ARE INTENDED TO INDICATE CAPACITY, SIZE AND LOCATION AND GENERAL ARRANGEMENTS. ALL NECESSARY FEATURES OF RELATED CONSTRUCTION WILL BE REQUIRED AS IF SHOWN IN DETAIL.

27. WHERE MECHANICAL AND ELECTRICAL EQUIPMENT LOCATIONS CONFLICT ELECTRICAL, LIGHT FIXTURE LOCATIONS SHALL TAKE PRECEDENCE.

28. WHERE PLUMBING OCCURS IN STUD WALL WITH HORIZONTAL OR VERTICAL PIPING, STUDS SHALL BE CONSTRUCTED DEEP ENOUGH TO ACCOMMODATE PIPING. SAME FOR ALL ELECTRICAL PANELS.

29. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL NEW MATERIALS (U.N.O.) AND QUALIFIED CRAFT PERSONS TO COMPLETE THE WORK.

30. CONSTRUCTION DOCUMENTS SHOW THE DESIGN INTENT OF THE PROJECT AND MAY NOT SHOW MINOR DETAILS OF PROPOSED INSTALLATIONS. THE INCLUSION OF THESE MINOR DETAILS IS IMPLIED TO PROVIDE A COMPLETE PROJECT AND ARE TO BE INCLUDED AS A PART OF A BID.

31. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSPECT EXISTING CONDITIONS PRIOR TO PROCEEDING WITH EACH INSTALLATION OR PART OF THE WORK. DISCREPANCIES MUST BE REPORTED TO THE ARCHITECT PRIOR TO PROCEEDING.

32. THE GENERAL CONTRACTOR IS TO COORDINATE THE INSTALLATION OF MATERIALS AND WORK OF OTHERS WHO ARE NOT SUB-CONTRACTORS TO THE G.C., YET ARE REQUIRED TO PROVIDE A COMPLETED PROJECT. AREAS OF WORK REQUIRING COORDINATION INCLUDE BUT ARE NOT LIMITED TO THOSE INDICATED AS N.I.C. ON THE CONSTRUCTION DOCUMENTS.

33. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR COORDINATION OF WORK.34. IN THE CASE OF CONTRADICTIONS BETWEEN DRAWINGS OR BETWEEN DRAWINGS AND

SPECIFICATIONS, ASSUME THE MORE COSTLY APPROACH FOR BIDDING PURPOSES. BRING ALL CONTRADICTIONS TO THE ATTENTION OF THE ARCHITECT.

35. THE CONSTRUCTION DOCUMENTS CONSIST OF THE CONSTRUCTION DRAWINGS AND SPECIFICATIONS INCLUSIVELY. SOME ITEMS MAY BE SHOWN ONLY ON THE DRAWINGS, OR INDICATED ONLY IN THE SPECIFICATIONS. FOR EXAMPLE, THE SPECIFICATIONS MAY SAY TO PAINT ALL EXPOSED STRUCTURAL STEEL, BUT THIS MAY NOT BE CALLED OUT ON ALL OF THE DRAWINGS.

36. ALL WORK SHALL COMPLY WITH STATE AND LOCAL CODES. CONTRACTOR SHALL INSURE FULL COMPLIANCE WITH FLAME SPREAD REQUIREMENTS.

37. CONTRACTOR SHALL PROMPTLY REMOVE ALL WASTE MATERIALS AND LEAVE PREMISES AND SITE CLEAN.

38. THE CONTRACTOR SHALL PROVIDE ALL CEILING AND/OR WALL ACCESS PANELS/DOORS AS REQUIRED BY THE AIR CONDITIONING, PLUMBING & ELECTRICAL SYSTEMS, PROVIDE APPROVED ASSEMBLIES W/ SELF-CLOSING DEVICES IN RATED CONSTRUCTION. (PAINT TO MATCH ADJACENT WALL COLOR)

39. ALL PENETRATIONS OF FIRE RESISTIVE CONSTRUCTION SHALL BE PROTECTED WITH APPROVED FIRE ASSEMBLIES.

40. ELECTRICAL OUTLETS AND LIGHTING ARE ONLY SHOWN SPORATICALLY ON ARCHITECTURAL "A" SHEETS WHERE PLACEMENT OF SUCH IS CRITICAL TO PARTICULAR AESTHSTICS. ELECTRICAL INDICATIONS ON "A" SHEETS ARE NOT MEANT TO BE COMPLETE OR EXAUSTIVE. SEE ELECTRICAL DRAWINGS FOR ALL ELECTRICAL AND DATA FEATURES.

DRAWING SET NOTE: THESE DRAWINGS ARE TO BE UTILIZED AS A COMPLETE SET FOR BIDDING AND CONSTRUCTION. INDIVIDUAL SECTIONS OF DRAWINGS SHOULD NOT BE SEPARATED FROM THE ENTIRE SET. IMPORTANT NOTES FOR ONE AREA OF WORK MAY BE INCLUDED IN OTHER AREAS IN THE DRAWINGS. ALL CONTRACTORS AND SUPPLIERS MUST REVIEW ENTIRE DRAWING SET AND SPECIFICATIONS.

GENERAL NOTES:

1. THE GENERAL CONDITIONS TO THE CONTRACT FOR THE CONSTRUCTION OF BUILDINGS: THE MONTANA STATE UNIVERSITY GENERAL CONDITIONS TO THE CONTRACT FOR CONSTRUCTION, HEREINAFTER REFERRED TO AS THE GENERAL CONDTIIONS, IS HEREBY MADE A PART OF THE ARCHITECTURAL SPECIFICATIONS.

2. CONTRACT DOCUMENTS INCLUDE THE ARCHITECT'S DRAWINGS, SPECIFICATIONS, GENERAL CONDITIONS, AGREEMENT (BUILDING CONTRACT) AND ALL ADDENDA. THEY ARE TO INCLUDE ALL LABOR, EQUIPMENT, AND MATERIALS NECESSARY FOR THE PROPER EXECUTION OF THE WORK EXCEPT AS MAY BE SPECIFICALLY NOTED OTHERWISE ON THE DRAWINGS OR FOR WHICH SEPARATE PRICES MAY BE ASKED IN THE BID PROPOSAL.

3. REGULATIONS, TAXES AND PERMITS: THE WHOLE OF THE WORK IS TO BE EXECUTED IN STRICT ACCORDANCE WITH THE REGULATIONS AND CODES OF THE GOVERNMENTAL AGENCIES WHOSE JURISDICTION IS APPLICABLE.

GENERAL CONDITIONS:

@ atA.B. anchor boltAC asphaltic concreteA/C air conditioningACC PNL access panelACOUST acousticalACT acoustical ceiling tileAD area drainADJ adjacentA.F.F. above finished floorA.I.B. air infiltration barrierALT alternateALUM aluminumANOD anodizedAPPROX approximateAPPRD approvedARCH architectAUTO automaticBBD bulletin boardBD boardBITUM bituminuousBL building lineBLDG buildingBLK blockBLKG blockingBLDG buildingBLKG blockingBM beam/bench markBO by ownerB.O. bottom ofBOT bottomBRK brickBRG bearingB/S building standardBSBD baseboardBTW betweenBTM/BOTT bottomBTWN betweenB.O.W. bottom of wallBU built upCAB cabinetCAP capacityCB catch basinCBD chalk boardCB-ICF cement based insulated concrete formCD ceiling diffuserC.F. cement fiber (siding and trim)/cubic feetCL centerlineC.B. catch basinC.C. center to centerCDX exterior grade plywoodC.T. ceramic tileCG ceiling grill/corner guardCH channelCI cast iron/cubic incheseCJ control jointCLG ceilingC.L.L. contract limit lineCL center lineCLO closetCLR clearCMU concrete masonry unitCMNT cementCMT ceramic mosaic tileCO clean outCOL/COLS column/columnsCONC concreteCOND conditionCONF conferenceCONN connectionCONST constructionCTRD centeredCONT continuousCONTR contractorCORR corridorCPT carpetCR ceiling registerCT ceramic tileCTR counterCUH cabinet unit heaterCW cold waterCY cubic yardDBL doubleDEPT departmentDF drinking fountainDIA diameterDIAG diagonalDIM dimensionDISP dispenserDL dead loadDN downDP demountable partitionDR doorDWR drawerDS downspoutDTL/DET detailDWG drawingE eastEA eachEIFS exterior insulation finish systemE.J. expansion jointEL/ELEV elevation - height/elevatorELEC electricalENCL enclosureEO electrical outletEP electrical panelEQ equalEQUIP equipmentEWC electrical water coolerEWH electrical water heater(E)/EXIST existingEWC electrical water coolerEWH electrical water heaterEXH exhaustEXP expansionEXT exteriorEWA/EW exterior wall assemblyFA fire alarm/floor-ceiling assemblyFABR fabricateFAH fire alarm hornFAS fire alarm stationFBR face brickFD floor drainFDN/FDTN foundationFFHB frost free hose bibFG finish gradeFH fire hydrantFIN. FLOOR top of floor sheathingFIN finishFIO furnished and installed by ownerFIX/FXTR fixtureF.O. face ofFDN foundationFEC fire extinguisher cabinetFF finished floorFLR/FL floorFLUOR fluorescentFND feminine napkin dispenser/disposalFOC face of concreteFOIC furnished by owner and installed byFOS face of studFOW face of wallFT foot or feetFTG footingFTIC furnished by tenant & installed by

contractorFE fire extinguisherGA gaugeGB grab barGAF brand name roofing productGALV galvanized G.C. general contractorGEN generalGI galvanized ironGL glassGLU LAM or G.L.B. glue laminated beamGRD grade/gridGS galvanized steelGWB gypsum wall boardGYP gypsumHB hose bibHC hollow core/handicappedHD BD Hard boardHDR headerHOR horizontalHP high pointHR hourHT heightHTG heatingHVAC heating, ventilation, air conditioningHW hot water

IN inchINCL includedINFO informationINSUL insulationINT interiorIWA/IW interior wall assemblyJAN janitorJST joistJT jointLAV lavatoryLF lineal footLTG lightingLVR louverM men'sMNFR/MANUF. manufacturerMAT materialMAX maximumMECH mechanicalMC medicine closetMDF medium density fiber boardMEMB membraneMEZZ mezzanineMH man holeMIN minimumMIRR mirrorMISC miscellaneousMO masonry openingMTL metalMULL mullionN northNA not applicableNAT naturalNIC not in contractNO numberNTS not to scaleOA over allO.C. on centerOD outside diameterOH overhead/opposite handOPNG openingOPP oppositePART.BD. particle boardPART’N/PART partitionPC precast concretePL platePLAM plastic laminatePLAST plasticPLWD plywoodPND paper napkin dispenserPNL panelPR pairPSL parallel strand lumberPT pointPTD paper towel dispenserPTD/R paper towel dispenser/receptaclePVMT pavementP.V.C. polyvinylchlorideQTY quantityR/RAD radiusR riserRA roof/ceiling assemblyRB rubber baseRD roof drainRDWD redwoodRE regardingREC recessedREF referenceREFR refrigeratorREINF reinforcingREQD/REQ requiredRES resilientRM roomRO rough openingRV roof ventR&S rod and shelfS southSACT suspended acoustical ceiling tileSAT suspended acoustical tile ceilingSC solid coreSCD seat cover dispenserSCHED scheduleSD soap dispenserSECT sectionSF square feetS.G. supply grillSGL safety glassSHLVS shelvesSHLVNG shelvingSHT sheetSHTG sheathingSHWR showerSIM similarSIM. similarS.I.P. structural insulated panelSLNT sealantSM surface mountedSOG slab on gradeS.STL./SS stainless steelS&P shelf and poleSPEC specificationsSS service sinkSTD standardSTL steelSTOR storageSTRUCT/STRUC structuralSUBFLR subfloorSUSP suspendedS&V stain and varnishSV sheet vinylSY square yardT tread/thermostatTB towel barTEL telephoneTEMP temperatureT&G tongue and grooveT.ALUM. tubular aluminumT.B. test boreTHK thickTHRU throughT.J.I./TJI Truss Joist IncorporatedT.O. top ofT.O.B. top of beamTOC top of concreteT.O.P. top of plateT.O. FTG top of footingT.O.S. top of steelT.O. SL. top of slabT.O.W. top of wallTP toilet paper holderTPD toilet paper dispenserTPG toppingTR/TRD treadT.S. tubular steelTV televisionTYP typicalUBC uniform building codeUG undergroundUH unit heaterUNO unless noted otherwiseUR urinalUV unit ventilatorVAC vacuum outletVAR variesVB vapor barrierVCT vinyl composition tileVEN veneerVERT verticalVEST vestibuleVG vertical grainVIN vinylVP veneer plasticVT vinyl tileVWC vinyl wall coveringW west/women/widthW/ withW/O with outWB wood baseWC water closetWD woodW/D washer/dryerWGW windowWGL wire glassWH water heaterWM wire meshWNDW/WDW windowWP waterproofWR water resistantWS weatherstripWSCT wainscotWT weightWWF welded wire fabricWWM welded wire meshX byYH yard hydrantYD yard

ABBREVIATIONS:

72

0 S

. Tr

acy

Ave

., B

ozem

an, M

T

dRA-

Arc

hite

ct.c

om

dRA

den

nis

Raf

fens

perg

erArc

hite

ct

REV. DESCRIPTION DATE

REVIEWED BY:DRAWN BY:

SHEET

DATE

SHEET TITLE

MO

NT

AN

AST

AT

E U

NIV

ER

SIT

Y

MSU-CPDCMONTANA STATE UNIVERSITY

BOZEMAN, MONTANAPHONE: 406.994.5413

FAX: 406.994.5665

Consultant #:1710

CL

ASS

RO

OM

RE

NO

VA

TIO

NS

2018

REI

D H

ALL

33

2-3

33

10

0%

CO

NS

TRU

CTI

ON

DR

AW

ING

S

AuthorChecker

GENERALINFORMATION

A00103/19/2018

PR

OJE

CT

#2

PPA#18-2012

Page 3: J:MSU CLASSROOM REMODEL0.2 Revit ModelsReid … 302 301 304 305 306 308 309 310 311 312 313 314 355 UP DN DN UP UP DN ROOF OVER CLASSES BELOW UP UP REID 333-332 PROJECT LOCATION dRA

SUMMARY CODE REVIEW SEE CODE PLAN, THIS SHEET

OCCUPANCY CLASSIFICATION: BUSINESS GROUP BEDUCATIONAL OCCUPANCIES FOR STUDENTS ABOVE 12TH GRADE

TYPE OF CONSTRUCTION: 3B

SPRINKLER SYSTEM: NONE EXISTING NONE PROPOSED

PROPOSED SIZE:REID 332 - 1047 SQ FTREID 333 - MAINTAINS EXISTING SIZE 872 SQ FT

OCCUPANT LOADS:BUILDING SPACES:THIS PROJECT IS NOT CHANGING BUILDING AREA OR OCCUPANCY TYPE AND IS, THEREFORE, NOT INCREASING OCCUPANT LOAD

BUILDING SUMMARY

THIS PROJECT SHALL COMPLY WITH THE LATEST EDITION OF CODES ADOPTED BY THE STATE OF MONTANA AND THE CITY OF BOZEMAN:

2012 International Building Code (IBC)2012 International Mechanical Code (IMC)2012 International Fuel Gas Code (IFGC)2012 Uniform Plumbing Code (IAMPO)2014 National Electrical Code (NEC)2012 International Fire Code (IFC)2012 International Energy Conservation Code (IECC)

APPLICABLE BUILDING CODES

Project Description:CLASSROOM REMODEL AT THE MONTANA STATE UNIVERISTY

EXITING, Main Floor:REID 332 & REID 333- MEETS DEFINITON OF IEBC LEVEL 2 ALTERATION (Section 805 Means of Egress, Section 805.1 Scope)

EXIT ACCESS ARRANGEMENTRequirements for Level 2 alteration does not apply as 3rd floor of building is occupied by single tenant.

TRAVEL DISTANCESection 805.4.1.1 Occupant load and travel distance: In any work area, all rooms and spaces having an occupant load greater than 50 or in which the travel distance to an exit exceeds 75 feet shall have a minimum of two egress doorways- does not apply.

MEANS OF EGRESSSection 704.1 Means of Egress General: Alterations shall be done in a manner that maintains the level of protection provided for the means of egress.

EXIT SIGNSTHIS PROJECT IS NOT CHANGING EXISTING EXIT SIGNS.

A B C D

4

3

E F

5

872 SF

REID

3331047 SF

REID

332

72

0 S

. Tr

acy

Ave

., B

ozem

an, M

T

dRA-

Arc

hite

ct.c

om

dRA

den

nis

Raf

fens

perg

erArc

hite

ct

REV. DESCRIPTION DATE

REVIEWED BY:DRAWN BY:

SHEET

DATE

SHEET TITLE

MO

NT

AN

AST

AT

E U

NIV

ER

SIT

Y

MSU-CPDCMONTANA STATE UNIVERSITY

BOZEMAN, MONTANAPHONE: 406.994.5413

FAX: 406.994.5665

Consultant #:1710

CL

ASS

RO

OM

RE

NO

VA

TIO

NS

2018

REI

D H

ALL

33

2-3

33

10

0%

CO

NS

TRU

CTI

ON

DR

AW

ING

S

AuthorChecker

CODE INFORMATION

A00203/19/2018

PR

OJE

CT

#2

PPA#18-2012

1/4" = 1'-0" REF: 1/ A200

REID 332-333 CODE PLAN2

0' 2' 4' 8' 16'

Page 4: J:MSU CLASSROOM REMODEL0.2 Revit ModelsReid … 302 301 304 305 306 308 309 310 311 312 313 314 355 UP DN DN UP UP DN ROOF OVER CLASSES BELOW UP UP REID 333-332 PROJECT LOCATION dRA

J

J

WAP WAP

A B C D

4

3

E F

5

1.

DEMOLISHED

EXISTING WALL TO REMAIN

DEMO LEGEND

2.

3.

5.

5.

5.

7. 5.

4.4.

4.

4.

4.

SEE HAZARDOUS MATERIALS REPORT

6.

11.

11.

11.

12.

8.

A. PATCH AND PREP ALL WALLS FOR PAINT UNLESS OTHERWISE INDICATED.B. VERIFY ALL CONDITIONS AND COORDINATE WITH ALL DISCIPLINES OF CONTRACT.

UNDOCUMENTED FIELD CHANGES MAY HAVE OCCURRED AND ARE TO BE BROUGHT TO THE ATTENTION OF THE ARCHITECT WHEN DISCOVERED.

C. WHERE DEMOLITION IS INDICATED, WALLS SHALL BE REMOVED AND CEILING SHALL BE PATCHED, REPAIRED AND PAINTED TO MATCH EXISTING.

D. UNLESS DEMOLITION IS INDICATED, PATCH AND PROTECT EXISTING CEILING.E. COORDINATE ALL MECHANICAL, ELECTRICAL, FIRE SYSTEMS, COMMUNICATIONS AND UTILITY

SHUT-DOWNS WITH OWNER PRIOR TO REMOVING AND OR RELOCATING, PER MSU REQUIREMENTS.

F. ALL DEMOLITION DRAWINGS ARE INTENDED TO SHOW GENERAL SCOPE OF WORK WITHIN THE INTENT OF THE PROJECT AND ARE NOT INTENDED TO EXCLUDE ANY DEMOLITION WORK NECESSARY FOR PRIOR COMPLETION OF THE WORK OUTLINED IN THE PROJECT DOCUMENTS. CONTRACTOR SHOULD ASSUME ADDITIONAL MINOR DEMOLITION ITEMS NOT SHOWN ON PLANS, NO ADDITIONAL PAYMENT WILL BE MADE FOR SUCH MINOR ELEMENTS.

G. THESE DRAWINGS INDICATE STRUCTURAL AND NON-STRUCTURAL DEMOLITION THAT IS TO OCCUR TO MAKE WAY FOR NEW CONSTRUCTION. ADDITIONAL STRUCTURAL DEMOLITION WORK, CONSTRUCTION OR SHORING REQUIRING COORDINATION WITH NEW STRUCTURAL INS INDICATED ON THE STRUCTURAL DRAWINGS.

H. SEE MECH. AND ELEC. DEMOLITION PLANS FOR SPECIFIC DEMO OF MECHANICAL AND ELECTRICAL SYSTEMS.

I. SEE HAZARDOUS MATERIALS ABATEMENT REPORT FOR ADDITIONAL INFORMATION AND COORDINATION.

GENERAL DEMOLITION NOTES:

A B C D

4

3

E F

5

9.

10.

10.

13.

14.14.

72

0 S

. Tr

acy

Ave

., B

ozem

an, M

T

dRA-

Arc

hite

ct.c

om

dRA

den

nis

Raf

fens

perg

erArc

hite

ct

REV. DESCRIPTION DATE

REVIEWED BY:DRAWN BY:

SHEET

DATE

SHEET TITLE

MO

NT

AN

AST

AT

E U

NIV

ER

SIT

Y

MSU-CPDCMONTANA STATE UNIVERSITY

BOZEMAN, MONTANAPHONE: 406.994.5413

FAX: 406.994.5665

Consultant #:1710

CL

ASS

RO

OM

RE

NO

VA

TIO

NS

2018

REI

D H

ALL

33

2-3

33

10

0%

CO

NS

TRU

CTI

ON

DR

AW

ING

S

AuthorChecker

DEMO PLANS

A10003/19/2018

PR

OJE

CT

#2

PPA#18-2012

1/4" = 1'-0" REF: 1/ A200

REID 332-333 PLAN DEMO PLAN1

DEMOLITION NOTES1. REMOVE WALLS

2. REMOVE RISER. PATCH WALL TO MATCH EXST, PATCH & PREP FLOOR FOR NEW CARPET

3. REMOVE ALL CARPET AND TILE; SEE HAZARDOUS MATERIALS REPORT

4. REMOVE WHITEBOARD. SALVAGE WHITEBOARD IF IN GOOD CONDITION AFTER REMOVAL; SEEHAZARDOUS MATERIALS REPORT. PATCH AND PREP WALL FOR PAINT.

5. REMOVE DOOR AND FRAME; PATCH WALL TO MATCH EXISTING WALL

6. REMOVE DOOR, FRAME, AND WINDOW

7. KEEP AND PROTECT EXISTING CARPET AND BASE

8. REMOVE EXISTING BASE ON THIS WALL ONLY. PREP FOR NEW BASE.

9. REMOVE EXISTING CEILING TILES. PREP EXISTING PLASTER CEILING FOR NEW GYP CEILING

10. PATCH AND PROTECT EXISTING CEILING TILE. PREP FOR PAINT.

11. REMOVE DOOR HARDWARE. PREP FOR NEW ADA DOOR HARDWARE.

12. REMOVE DOOR LOUVRE AND GRILL. PREP FOR SOLID PANEL REPLACEMENT.

13. DEMO CEILING FOR NEW MECHANICAL EQUIPMENT. LIMIT OPENING TO SIZE OF GRILL. SEE MEP

14. DEMO CEILING FOR NEW ACCESS PANEL. LIMIT OPENING TO SIZE OF PANEL. SEE MEP

1/4" = 1'-0" REF: 1/ A200

REID 332-333 RCP DEMO3

Page 5: J:MSU CLASSROOM REMODEL0.2 Revit ModelsReid … 302 301 304 305 306 308 309 310 311 312 313 314 355 UP DN DN UP UP DN ROOF OVER CLASSES BELOW UP UP REID 333-332 PROJECT LOCATION dRA

A B C D

4

3

E F

5

A2005 A200

48

7

6 2

13

872 SF

REID

3331047 SF

REID

332P3P3

TRANSITION STRIP

INFILL WALL. PATCH AND TEXTURE TO MATCH EXISTING WALL. FIELD VERIFY PAINT COLOR AND TEXTURE.

INFILL WALL. PATCH AND TEXTURE TO MATCH EXISTING WALL. FIELD VERIFY TEXTURE.

INFILL WALL. PATCH AND TEXTURE TO MATCH EXISTING WALL.

INFILL WALL. PATCH AND TEXTURE TO MATCH EXISTING WALL.

INFILL WALL. PATCH AND TEXTURE TO MATCH EXISTING WALL.

IN-CARPET TRACK FOR UMBILICAL. LOCATION TO BE FIELD VERIFIED

3'-0"

4'-0

"

4'-0

"

PODIUM NIC. FOR REFERENCE ONLY

PODIUM NIC. FOR REFERENCE ONLY 20'-6"

P1

P1

P1

P1

P1

P1

WHITEBOARD PAINT ALT.- P8WHITEBOARD PAINT ALT.-P8

9A200

A500

3

Sim

1

A500Sim

TYP. FLAT PANEL DISPLAY INSTALL:FLAT PANEL DISPLAY & MOUNT NIC. GC TO INSTALL APPROPRIATE BACKING/SUPPORT & MOUNTING HARDWARE. FINAL LOCATION TO BE FIELD VERIFIED.

IN-CARPET TRACK FOR UMBILICAL. LOCATION TO BE FIELD VERIFIED

A B C D

4

3

E F

5

EXST. T8'-4 1/2"EXST. T

8'-4 1/2"GYP.

8'-4 1/2"

15'-0

"

14'-1

1"

TYP. PROJECTOR INSTALL:PROJECTOR NIC. GC TO PURCHASE AND INSTALL APPROPRIATE MOUNTING HARDWARE. GC TO INSTALL APPROPRIATE BACKING/SUPPORT. FINAL LOCATION TO BE FIELD VERIFIED.

PROJECTION SCREEN INSTALL:GC TO PURCHASE AND INSTALL SCREEN AND APPROPRIATE MOUNTING HARDWARE. GC TO INSTALL APPROPRIATE BACKING/SUPPORT. FINAL LOCATION TO BE FIELD VERIFIED.

CT-18'-3 1/4"

CT-18'-3 1/4" 4'

-0"

4'-0"

ACOUSTIC PANEL LAYOUT TYP.: EVENLY SPACE & STAGGER PANELS WITHOUT OBSTRUCTING MEP

4

A101

3

A101

5

A101Sim

5

A101Sim

CEILING ACCESS PANEL

1'-6"CEILING ACCESS PANEL

6"

6"

ROOM FINISH LEGENDFLOOR FINISHES:

RUBBER BASE: DARK GRAY COLOR, 3.2 MM THICK, 4" HIGHBASE FINISHES:

PAINTED GWB: PAINT COLOR OVER GYPSUM BOARD - TYP. U.N.O.. COLOR AS INDICATED.

PAINT COLOR SELECTIONS:P1- OFF WHITE. SHERWIN WILLIAMS "CREAMY" SW-7012. LRV 83P2- ACCENT COLOR: ORANGE. SHERWIN WILLIAMS "RHUMBA ORANGE" SW-6642. LRV 27P8- WHITEBOARD PAINT, SEE SPEC

WALL FINISHES:

CARPET-CP3

FLOOR FINISH NOTES:1. IF FINISHES ARE NOT CLEARLY INDICATED FOR AN AREA, CLARIFY INTENT WITH

ARCHITECT.2. PROVIDE APPROPRIATE TRANSITION TRIM AT ALL MATERIAL CHANGES.3. TEST ALL SUBSTRATES TO VERIFY COMPLIANCE WITH FINISH MANUFACTURE'S

SPECIFICATIONS PRIOR TO FLOORING INSTALLATION.4. PATCH, REPAIR, AND/OR GRIND ALL SUBSTRATES TO ACCEPTABLE LEVEL OF

SMOOTHNESS/LEVELNESS PRIOR TO FLOORING INSTALLATION.5. FLOORING CHANGES FROM ROOM TO ROOM TO OCCUR DIRECTLY UNDER THE DOOR

LOCATION.6. SAMPLES FOR ALL FINISHES MUST BE SUBMITTED TO AND APPROVED BY ARCHITECT

PRIOR TO ORDERING.

SEE ROOM FINISH SCHEDULE FOR LISTING OF MATERIALS .

WALL FINISH NOTES:1. SEE INTERIOR ELEVATIONS FOR INTERIOR WINDOWS, SPECIAL WALL FINISHES, TRIM, ETC.2. IF FINISHES ARE NOT CLEARLY INDICATED FOR AN AREA, CLARIFY INTENT WITH ARCHITECT.3. PROVIDE APPROPRIATE TRANSITION TRIM AT ALL MATERIAL CHANGES.4. PROVIDE CLEAN, CONSISTENT CAULK JOINTS AT ABUTMENTS OF DISSIMILAR MATERIALS.5. PROVIDE METAL EDGING AT ALL GYPSUM BOARD EDGES THAT ABUT DISSIMILAR

MATERIALS.

CORNER TRIMS:

CORNER TRIM, 26 GA. PREFIN. METAL CORNER TRIM WITH 2" WINGS, LENGTH AS INDICATED ON PLANS OR ELEVATIONS.

C.T.

DOOR & DOOR FRAME FINISHES:1. ALL METAL DOORS AND DOOR FRAMES TO RECEIVE PAINT FINISH AS SPECIFIED.

COLOR SELECTIONS:INTERIOR PAINTED DOORS: KEEP EXISTINGINTERIOR PAINTED DOOR FRAMES: P1

CEILING FINISHES:

EXST. 1 EXISTING CEILING TILE: TO BE PREPPED AND PAINTED, SEE SPECIFICATION

GYP. GYPSUM CEILING: GYPSUM TO BE APPLIED DIRECTLY TO EXISTING PLASTER CEILING. PAINT TO MATCH CEILING TILE

CARPET-EXIST.

CARPET TILE- CP3: 25CM X 1 M CARPET TILE. INSTALLATION METHOD: ASHLAR; VARY LOCATION OF ACCENT COLOR TO GET RANDOM PATTERN EFFECT

CARPET COLOR: GRAY MARBLE WITH ORANGE & YELLOW LINEAR ACCENT COLORS

CARPET TILE- EXIST:THIS TILE IS TO BE KEPT AND PROTECTED

CT-1 CT-1 CEILING TREATMENT: ACOUSTIC CEILING PANELS TO BE ATTACHED TO EXISTING CEILING TILE.

PANEL FABRIC DESCRIPTION: LINE - SURF 2941, COLOR - BANKS 9010

CHAIR RAIL: CORIAN SOLID SURFACE - TYP. U.N.O. COLOR AS INDICATED.

CORIAN COLOR SELECTIONS:CR3 - CARBON CONCRETE

CHAIR RAIL NOTES:1. FIELD LAYOUT ALL CHAIR RAIL LENGTHS2. CHAIR RAIL TO WRAP COLUMNS AS SHOWN IN INTERIOR ELEVATIONS.

CHAIR RAIL:TRANSITION STRIP: SOLID VINYL REDUCER STRIP; LIGHT GRAY COLOR.

WHITEBOARD PAINT ALTERNATE

PAINT: P8- WHITEBOARD PAINTWHERE INDICATED USE P8 - WHITEBOARD PAINT INSTEAD OF P1 - OFF WHITE PAINT.

WALL FINISHES:

NOTE:1. WALLS WILL NEED TO BE RE-FINISHED BEFORE WHITEBOARD PAINT TO ENSURE SMOOTH WRITING SURFACE.

2. WHITEBOARDS ARE TO BE REMOVED FROM SCOPE OF WORK WHERE P8-WHITEBOARD PAINT IS USED.

EXST CLG SUSPENDED SYSTEM

EXST PLASTER CLG

EXST TILES TO REMAIN & PAINTED

5/8" TYPE X GWB ATTACHED TO EXST PLASTER CLG OR NOTE (1)

DRYWALL EDGE BEAD, TAPED

DEMOLISHED WALL

NOTE:1. IF THERE IS NO PLASTER CLG @ DEMOLISHED WALL, FILL GAP IN PLASTER TO MAINTAIN FIRE RATED CLG. CONST.

EXST CLG SUSPENDED SYSTEM

EXST PLASTER CLG

EXST TILES TO REMAIN & PAINTED

CLIP ATTACHED TO EXST CEILING PER MANF RECMD

CLIP PRE-ATTACHED TO ACOUSTIC PANEL

ADHESIVE PER MANF RECMD

ACOUSTIC PANEL:SEE SPECIFICATION SECTION 098550

1 1/

8"

EXST CLG SUSPENDED SYSTEM

EXST PLASTER CLG

EXST TILES TO REMAIN & BE PAINTED

NOTE:1. NEW ACCESS PANEL TO MAINTAIN EXST FIRE RATING @ CEILING ASSEMBLY. ACCESS PANEL DOOR TO BE 20 GA STEEL W/2" INSULATION ON CONT HINGE

ACCESS PANEL FRAME & TRIM: 1" 16 GA STEEL FLANGE. ATTACH FLANGE DIRECTLY TO EXST PLASTER CLG

ACCESS PANEL DOOR

72

0 S

. Tr

acy

Ave

., B

ozem

an, M

T

dRA-

Arc

hite

ct.c

om

dRA

den

nis

Raf

fens

perg

erArc

hite

ct

REV. DESCRIPTION DATE

REVIEWED BY:DRAWN BY:

SHEET

DATE

SHEET TITLE

MO

NT

AN

AST

AT

E U

NIV

ER

SIT

Y

MSU-CPDCMONTANA STATE UNIVERSITY

BOZEMAN, MONTANAPHONE: 406.994.5413

FAX: 406.994.5665

Consultant #:1710

CL

ASS

RO

OM

RE

NO

VA

TIO

NS

2018

REI

D H

ALL

33

2-3

33

10

0%

CO

NS

TRU

CTI

ON

DR

AW

ING

S

MOSAICDRA

FLOOR PLAN &REFLECTED CEILINGPLANS & DETAILS

A10103/19/2018

PR

OJE

CT

#2

PPA#18-2012

1/4" = 1'-0" REF: 1/ A200

REID 332-333 PLAN1

1/4" = 1'-0" REF: 1/ A200

REID 332-333 RCP2

3" = 1'-0" REF: 2/ A101

CEILING DETAIL @ TRANSITION3

3" = 1'-0" REF: 2/ A101

CEILING DETAIL @ ACOUSTIC PANEL4

3" = 1'-0" REF: 2/ A101

CEILING DETAIL @ ACCESS PANEL5

Page 6: J:MSU CLASSROOM REMODEL0.2 Revit ModelsReid … 302 301 304 305 306 308 309 310 311 312 313 314 355 UP DN DN UP UP DN ROOF OVER CLASSES BELOW UP UP REID 333-332 PROJECT LOCATION dRA

LEVEL 1100'-0"

P1

CR1

2'-7"

3'-0

"

10"

RUBBER BASEEXST

WB2

FLAT PANEL DISPLAY

FLAT PANEL DISPLAY INSTALL:FINAL LOCATION TO BE FIELD VERIFIED.VERIFY WALL TYPE AND PROVIDE APPROPRIATE ANCHOR FOR MOUNTING.

LEVEL 1100'-0"

4" 4"

P1 P1

3'-0

"

10"

RUBBER BASE

CR1

P1

EXST

NEW ADA DOOR HARDWARE. SEE SPEC

NEW PANEL, STAIN TO MATCH DOOR

WB2

3'-9"

CR1

RUBBER BASE

LEVEL 1100'-0"

P3

3'-0

" P3

10"

NEW BASETO MATCH EXST BASE

WB1

EXST ELECTRICAL PANEL

5'-2

"

4'-0"

7'-4"

FLAT PANEL DISPLAY

FLAT PANEL DISPLAY INSTALL:FINAL LOCATION TO BE FIELD VERIFIED.VERIFY WALL TYPE AND PROVIDE APPROPRIATE ANCHOR FOR MOUNTING.

LEVEL 1100'-0"

8 1/2"

WB4 WB4

3'-0

"

3'-0

"

1'-10"

5'-7" 9'-4"

PROJECTION SCREEN INSTALL:FINAL LOCATION TO BE FIELD VERIFIED.VERIFY WALL TYPE AND PROVIDE APPROPRIATE ANCHOR FOR MOUNTING.

PROJECTION SCREEN INSTALL:FINAL LOCATION TO BE FIELD VERIFIED.VERIFY WALL TYPE AND PROVIDE APPROPRIATE ANCHOR FOR MOUNTING.

P1

P1

RUBBER BASEEXSTNEW BASE @ OLD DOOR LOCATIONTO MATCH EXST BASE

VERTICAL WIREMOLD, SEE MEP

LEVEL 1100'-0"

1"

WB2WB1

4"4"

CR1

RUBBER BASEP1

P1NEW ADA DOOR HARDWARE. SEE SPEC

VERTICAL WIREMOLD, SEE MEP

5'-2

"

5'-2

"

3'-0

"

10"

FLAT PANEL DISPLAY INSTALL:FINAL LOCATION TO BE FIELD VERIFIED.VERIFY WALL TYPE AND PROVIDE APPROPRIATE ANCHOR FOR MOUNTING.

FLAT PANEL DISPLAY INSTALL:FINAL LOCATION TO BE FIELD VERIFIED.VERIFY WALL TYPE AND PROVIDE APPROPRIATE ANCHOR FOR MOUNTING.

7"

11'-5" 13'-4"

FLAT PANEL DISPLAY FLAT PANEL DISPLAY

CR1

RUBBER BASE

P1

CR1

RUBBER BASE

LEVEL 1100'-0"

P32'-8 1/2"

3'-0

"

WB2

10"

CR1

RUBBER BASEP3

WHITEBOARD PAINT ALT.-P8

5'-2

"

FLAT PANEL DISPLAY INSTALL:FINAL LOCATION TO BE FIELD VERIFIED.VERIFY WALL TYPE AND PROVIDE APPROPRIATE ANCHOR FOR MOUNTING.

16'-2"

FLAT PANEL DISPLAY

LEVEL 1100'-0"

3'-0

"

6'-4"9'-0" P1

WB1WB2P1

4"CR1

RUBBER BASE3'-0

"

10"

NEW ADA DOOR HARDWARE. SEE SPEC

FLAT PANEL DISPLAY INSTALL:FINAL LOCATION TO BE FIELD VERIFIED.VERIFY WALL TYPE AND PROVIDE APPROPRIATE ANCHOR FOR MOUNTING.

5'-2

"

5'-2

"

5'-0" 3'-2"

FLAT PANEL DISPLAY FLAT PANEL DISPLAY

LEVEL 1100'-0"

3'-0

"

10"

P1

WB1

CR1

RUBBER BASEP1

WHITEBOARD PAINT ALT.-P8

6" 2'-7 3/8" 2'-7 3/8"

5'-2

"

FLAT PANEL DISPLAY INSTALL:FINAL LOCATION TO BE FIELD VERIFIED.VERIFY WALL TYPE AND PROVIDE APPROPRIATE ANCHOR FOR MOUNTING.

WB1

FLAT PANEL DISPLAY

WHITEBOARD PAINT ALT.-P8

EXST DOOR

REMOVE STOP, RE-INSTALL.

REMOVE LOUVER. REPLACE W/VENEER PLYWOOD PANELS. MATCH LOUVER THICKNESS AND DOOR STAIN

REMOVE STOP, RE-INSTALL.

EXST DOOR

72

0 S

. Tr

acy

Ave

., B

ozem

an, M

T

dRA-

Arc

hite

ct.c

om

dRA

den

nis

Raf

fens

perg

erArc

hite

ct

REV. DESCRIPTION DATE

REVIEWED BY:DRAWN BY:

SHEET

DATE

SHEET TITLE

MO

NT

AN

AST

AT

E U

NIV

ER

SIT

Y

MSU-CPDCMONTANA STATE UNIVERSITY

BOZEMAN, MONTANAPHONE: 406.994.5413

FAX: 406.994.5665

Consultant #:1710

CL

ASS

RO

OM

RE

NO

VA

TIO

NS

2018

REI

D H

ALL

33

2-3

33

10

0%

CO

NS

TRU

CTI

ON

DR

AW

ING

S

AuthorChecker

ELEVATIONS

A20003/19/2018

PR

OJE

CT

#2

PPA#18-2012

3/8" = 1'-0" REF: 1/ A101

Elevation REID 333 WEST5 3/8" = 1'-0" REF: 1/ A101

Elevation REID 333 NORTH6

3/8" = 1'-0" REF: 1/ A101

Elevation REID 333 EAST7 3/8" = 1'-0" REF: 1/ A101

Elevation REID 333 SOUTH8

3/8" = 1'-0" REF: 1/ A101

Elevation REID 332 SOUTH43/8" = 1'-0" REF: 1/ A101

Elevation REID 332 WEST3

3/8" = 1'-0" REF: 1/ A101

Elevation REID 332 NORTH23/8" = 1'-0" REF: 1/ A101

Elevation REID 332 EAST1

1 1/2" = 1'-0" REF: 1/ A101

SECTION DETAIL @ DOOR LOUVER9

Page 7: J:MSU CLASSROOM REMODEL0.2 Revit ModelsReid … 302 301 304 305 306 308 309 310 311 312 313 314 355 UP DN DN UP UP DN ROOF OVER CLASSES BELOW UP UP REID 333-332 PROJECT LOCATION dRA

1" TACK STRIP

8'-0"

4'-0

"

WB1

MARKER TRAY

1" TACK STRIP

10'-0"

4'-0

"

WB2

MARKER TRAY

1" TACK STRIP

12'-0"

4'-0

"

WB3

MARKER TRAY

1" TACK STRIP

16'-0"

4'-0

"

WB4

MARKER TRAY

1" TACK STRIP

20'-0"

4'-0

"

WB5

MARKER TRAY

NOTE: MOUNTING HEIGHT - BOTTOM OF WHITEBOARD IS TO BE 3' AFFWHITE BOARD TYPESSEE PLAN AND ELEVATIONS FOR LOCATIONS

10"

3/4" SOLID SURFACE MATERIAL W/ 45 DEGREE MITER JOINT @ TOP CORNER

3/4" PLYWD. CLEAT, GLUED TO SOLID SURF. MTL

SET CLEAT IN CONST. ADHESIVE

EXST WALL

CONTIN. SEALANT JT., COLOR MATCH TO SOLID SURF. MTL.

3/4" PLYWD. CLEAT SCREWED TO WALL

LEGRAND STEEL WIREMOLD V700 SERIES, OR EQ.

HUBBELL HBL5715BR TEE FITTING BEND RADIUS, OR EQ.

HUBBELL HBL5748 STANDARD I-GANG BOX, OR EQ., W/DUAL OUTLET

10"

3/4" SOLID SURFACE MATERIAL W/ 45 DEGREE MITER JOINT @ TOP CORNER

SET CLEAT IN CONST. ADHESIVE

EXST WALL

CONTIN. SEALANT JT., COLOR MATCH TO SOLID SURF. MTL.

3/4" PLYWD. CLEAT SCREWED TO WALL

LEGRAND STEEL WIREMOLD 3000 SERIES, OR EQ., CONTIN.

3/4" PLYWD. CLEAT, GLUED TO SOLID SURF. MTL

VERTICAL WIREMOLD

IN-CARPET TRACK FOR PODIUM UMBILICAL BELOW, SEE PLAN FOR LOCATION

WALL

SOLID SURFACE MTL

MITER CORNER, CONT SOLID SURFACE TO WALL FACE. TYP. @ ALL ENDS OF CHAIR RAIL

7"

CHAIR RAIL WRAPS COLUMN

EXST COLUMN

72

0 S

. Tr

acy

Ave

., B

ozem

an, M

T

dRA-

Arc

hite

ct.c

om

dRA

den

nis

Raf

fens

perg

erArc

hite

ct

REV. DESCRIPTION DATE

REVIEWED BY:DRAWN BY:

SHEET

DATE

SHEET TITLE

MO

NT

AN

AST

AT

E U

NIV

ER

SIT

Y

MSU-CPDCMONTANA STATE UNIVERSITY

BOZEMAN, MONTANAPHONE: 406.994.5413

FAX: 406.994.5665

Consultant #:1710

CL

ASS

RO

OM

RE

NO

VA

TIO

NS

2018

REI

D H

ALL

33

2-3

33

10

0%

CO

NS

TRU

CTI

ON

DR

AW

ING

S

AuthorChecker

TYPICAL DETAILS

A50003/19/2018

PR

OJE

CT

#2

PPA#18-2012

1" = 1'-0" REF: 1/ A101

CHAIR RAIL DETAIL1 1" = 1'-0"RACEWAY ALTERNATE CHAIR RAIL DETAIL2

1" = 1'-0" REF: 1/ A101

PLAN DETAIL - CHAIR RAIL @ VERTICAL WIREMOLD3

Page 8: J:MSU CLASSROOM REMODEL0.2 Revit ModelsReid … 302 301 304 305 306 308 309 310 311 312 313 314 355 UP DN DN UP UP DN ROOF OVER CLASSES BELOW UP UP REID 333-332 PROJECT LOCATION dRA

TT

A B C D E F

3

4

5

REID

333

REID

332

(E)R-

(E)R-

R-1

R-1

48"x24"

1

(TYP)

1

(TYP)

1

(TYP)

1

(TYP)

2

3

4

KEY NOTES:#

A.) IT SHALL BE THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR TO FIELD COORDINATE THE LOCATION OF EQUIPMENT ROUTING OF ALL DUCTWORK AND PIPING WITH ALL OTHER TRADES.

B.) IT SHALL BE THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR TO REVIEW THE DRAWINGS FOR ALL DICIPLINES AND PROVIDE ALL LABOR AND MATERIALS REQUIRED FOR A COMPLETE INSTALLATION.

C.) COORDAINTE THE INSTALLATION OF GRILLES, REGISTERS AND DIFFUSERS WITH THE ARCHITECTURAL REFLECTED CEILING PLANS AND THE ELECTRICAL LIGHTING PLANS.

D.) VERIFY THE LOCATION OF THERMOSTATS AND SENSORS WITH THE ARCHITECT AND ENGINEER PRIOR TO INSTALLATION. INSTALL THERMOSTATS 48" ABOVE FINISHED FLOOR PER ADA REQUIREMENTS.

E.) PROVIDE AND INSTALL SEISMIC BRACING FOR ALL EQUIPMENT, DUCTWORK AND PIPING PER THE REQUIREMENTS OF THE INTERNATIONAL BUILDING CODE.

F.) FLEXIBLE DUCTWORK BETWEEN BRANCH DUCTS AND GRILLES, REGISTERS OR DIFFUSERS SHALL BE LIMITED TO 5FT.

G.) PROVIDE AND INSTALL FIRE, SMOKE AND/OR COMBINATION SMOKE/FIRE DAMPERS WHERE DUCTWORK PASSES THROUGH FIRE RATED ASSEMBLIES. ASSOCAITED DUCTDETECTORS SHALL BE ADRESSABLE. SMOKE DAMPERS AND COMBINATION SMOKE/FIRE DAMPERS SHALL INCLUDE A KEYED REMOTE TEST SWITCH LOCATED IN AN ACCESSIBLE LOCATION. FIELD COORDINATE THE LOCATION OF TEST SWITCHES WITH THE ARCHITECT AND ENGINEER PRIOR INSTALLATION.

H.) SEAL ALL DUCT AND PIPE PENETRATIONS THROUGH FIRE RATED ASSEMBLIES WITH A UL-APPROVED FIRE STOP SYSTEM.

I.) PROVIDE ACCESS DOORS TO ALLOW SERVICE AND INSPECTION OF EQUIPMENT, VALVES, DAMPERS AND DEVICES INSTALLED ABOVE NON-REMOVABLE CEILINGS.

J.) PROVIDE REMOTE CONTROLLED DAMPER ACTUATORS FOR BALANCING DAMPERS INSTALLED IN INACCESIBLE LOCATION. PROVIDE RUSKIN ZPD25 OR APPROVED EQUAL.

GENERAL MECHANICAL NOTES

MATTHEW W.

CARR

No. 20181 PE

MONTA NA

L IC E NS ED

PR

OF

ESS IONA L ENGIN

EE

R

REV. DESCRIPTION DATE

REVIEWED BY:

DRAWN BY:

SHEET

DATE

SHEET TITLE

MO

NT

AN

AS

TA

TE

UN

IV

ER

SIT

Y

MSU-CPDCMONTANA STATE UNIVERSITY

BOZEMAN, MONTANA

PHONE: 406.994.5413

FAX: 406.994.5665

6159.001

CL

AS

SR

OO

MR

EN

OV

AT

ION

S 2

018

RE

ID H

AL

L 3

32

-33

3 1

00

% C

ON

ST

RU

CT

ION

DR

AW

ING

S

MWCECR

MECHANICAL PLAN &

SCHEDULE

M100

03/19/2018

PR

OJE

CT

#2

PPA#18-2012

3/16" = 1'-0"1MECHANICAL RENOVATION PLAN

1. EXISTING MIXING BOX DIFFUSERS TO REMAIN IN PLACE. CONTRACTOR SHALL CLEAN DIFFUSER FACE.

2. CONTRACTOR SHALL REINSTALL THE EXISTING DIFFUSER FACE IN THE NEW GYP. CEILING AND MAKE THE EXISTING MIXING BOX OPERATIONAL.

3. TRANSFER DUCT SHALL BE BE ACOUSTICALLY LINED. SEE SPECIFICATIONS FOR DETAILS.

4. REINSTALL EXISTING DIFFUSER IN NEW GYP. CEILING.

NOTES: PROVIDE MANUAL BALANCING DAMPER AT LOCATIONS WHERE A SPECIFIED AIR VOLUME IS REQUIRED I.E. FOR SUPPLY AND EXHAUST ONLY. COORDINATE FRAME AND MOUNTING TYPE WITH CEILING TYPES. SEE ARCHITECTURAL PLANS FOR CEILING TYPES. THE CONTRACTOR SHALL BERESPONSIBLE TO PROVIDE ALL FITTINGS AND ACCESSORIES REQUIRED FOR A COMPLETE INSTALLATION. SCHEDULES N.C. VALUES ARE VALID FOR SCHEDULE AIR FLOW ONLY AND REPRESENT A MAXIMUM ACCEPTABLE N.C. VALUE. SUBSTITUTED EQUIPTMENT SHALL HAVE N.C. VALUE EQUAL TO OR BELOWTHE SCHEDULES N.C. AT THE AIR FLOW LISTED ON THE PLANS.

R-1 KRUEGER S80P PERFORATED RETURN GRILLE WITH 48"x24" SURFACE MOUNTING... RETURN 2000 21 - - 0.03 46"x22" N/A STEEL BY ARCH SEE NOTES

MARK MFGR MODEL DESCRIPTION FUNCTION MAX CFMNC AT MAX

CFMTHROW AT MAX

CFM (FT)PRESSURE DROP AT MAX CFM

(in. W.C.)NECK SIZE

(W"xH")DAMPER TYPE MATERIAL FINISH REMARKS

GRILLE, REGISTER AND DIFFUSER SCHEDULE

Page 9: J:MSU CLASSROOM REMODEL0.2 Revit ModelsReid … 302 301 304 305 306 308 309 310 311 312 313 314 355 UP DN DN UP UP DN ROOF OVER CLASSES BELOW UP UP REID 333-332 PROJECT LOCATION dRA

X

D-1

X X

X X

J

TV

X

X

X

OS

P

R1

R2

R3

R4

LV

F F

F

S S

S S

BRANCH CIRCUIT PANELBOARD

PANEL AND CIRCUIT DESIGNATION ARE SHOWN NEXT TOEACH DEVICE (PANEL NAME - CIRCUIT NUMBER). BRANCHCIRCUIT WIRE SIZE IS #12 UNLESS NOTED OTHERWISE. ASINGLE INSULATED GREEN GROUND CONDUCTOR SHALL BEPROVIDED WITH EACH HOME RUN. PROVIDE A SEPARATENEUTRAL FOR EACH CIRCUIT. HOME RUNS SHALL HAVE NOMORE THAN THREE CIRCUITS. LINE VOLTAGE AND LOWVOLTAGE WIRING IS NOT SHOWN ON PLANS. FOR EQUIPMENTCIRCUITING, SEE MEP COORDINATION SCHEDULE.

DUPLEX, 4PLEX RECEPTACLE. (MOUNT AT +18" AFF. UNO.)X-GFI-GFCI RECEPTACLEWP-WEATHER PROOF WITH WHILE IN USE COVER

DUPLEX, 4PLEX ABOVE COUNTER RECEPTACLE MOUNTED 4"ABOVE BACKSPLASH

FLOOR OUTLET - HUBBELL MODEL #HBLCFB401CB, COVERMODEL #HBLTCGNTBKSW, OR EQUAL.

FLOOR BOX WITH COMBINATION 4PLEX RECEPTACLE & 2TELEPHONE/DATA OUTLETS- HUBBELL MODEL#HBLCFB401CB, COVER MODEL #HBLTCGNTBKSW, OR EQUAL.

JUNCTION BOX

COMBO POWER/DATA DIVIDED TV BOX; 2-GANG, LEGRAND2444D-2NFW, OR EQUAL. DUPLEX RECEPTACLE & SINGLEGANG DATA PORT W/ FACEPLATES. SEE ARCHITECTURALFOR MOUNTING HEIGHT.

SPECIAL PURPOSE OUTLET, MOUNT AT +18" AFF. UNO.LETTER INDICATES TYPE:TYPE A: NEMA 5-20R, TYPE B: NEMA 5-30R,TYPE C: NEMA 5-50R, TYPE D: NEMA 6-20R,TYPE E: NEMA 6-30R, TYPE F: NEMA 6-50RTYPE G: NEMA 14-20R, TYPE H: NEMA 14-30RTYPE I: NEMA 14-50R

PUSHBUTTON (MOUNT AT +54" AFF, UNO.). "X" DENOTES TYPE:"EPO" = EMERGENCY POWER OFF"ADA" = HANDICAP ACCESSIBLE DOOR (DEVICE BY OTHERS)"ODO" = OVERHEAD DOOR OPERATOR (DEVICE BY OTHERS)

SURFACE MOUNTED RACEWAY: SEE PLANS & SPECS.

RACEWAY STUB-OUT OR STUB-UP WITH CAPPED END

RACEWAY STUB-OUT OR STUB-UP WITH BUSHED END

ELECTRICAL POWER LEGEND

STANDARD LIGHTING CONTROLS:SWITCHES AND LINE VOLTAGE DIMMERS

TOGGLE SWITCH (MOUNT AT 46" AFF. UNO.)

SUBSCRIPTS:

NO SUBSCRIPT INDICATES SINGLE POLE

"3" INDICATES THREE-WAY

"4" INDICATES FOUR-WAY

"D" INDICATES DIMMER SWITCH - PHILIPS SUNRISE - ON/OFF

"K" INDICATES KEYED SWITCH

"T" INDICATES TIMER

"P" INDICATES PILOT LIGHT

"OS" INDICATES WALL SWITCH OCC SENSOR-

- WATTSTOPPER DW100 (SINGLE OR DUAL DW-200 SWITCH).

"OSD" INDICATES WALL SWITCH OCC SENSOR w/ 0-10V DIMMING

- WATTSTOPPER W-311

"a" INDICATES SINGLE POLE LIGHTING SWITCH FOR ZONE a

"b" INDICATES SINGLE POLE LIGHTING SWITCH FOR ZONE b

"ab" INDICATES LIGHTING SWITCHES w/ MULTIPLE ZONES

DIGITAL LIGHTING CONTROLS:ROOM CONTROLLERS AND LOW VOLTAGE DEVICES

DIGITAL OCCUPANCY SENSOR - CEILING MOUNT.WATTSTOPPER LMDC-100 OR EQUAL

DIGITAL PHOTOCELL - CEILING MOUNT. WATTSTOPPERLMLS-400 OR EQUAL

ROOM CONTROLLER - WATTSTOPPER DLM LMRC-101 OR EQUAL.

ROOM CONTROLLER - WATTSTOPPER DLM LMRC-102 OR EQUAL.

ROOM CONTROLLER - WATTSTOPPER DLM LMRC-212 OR EQUAL.

ROOM CONTROLLER - WATTSTOPPER DLM LMRC-213 OR EQUAL.

LOW VOLTAGE SWITCH - WATTSTOPPER LMSW-10X, "X"DENOTES NUMBER OF BUTTONS. SEE LIGHTING CONTROLDIAGRAM ON THIS SHEET.

ELECTRICAL LIGHTING CONTROL LEGEND

RECESSED FLUORESCENT FIXTURE- "a" & "b" DESIGNATESSWITCH

RECESSED EMERGENCY FLUORESCENT FIXTURE- "a"& "b"DESIGNATES SWITCH

SURFACE OR PENDANT FLUORESCENT FIXTURE- "x"DESIGNATES SWITCH LEG

SURFACE OR PENDANT EMERGENCY FLUORESCENT FIXTURE-"x" DESIGNATES SWITCH LEG

1X4 SURFACE WALL MOUNT FLUORESCENT

FLUORESCENT STRIP OR INDUSTRIAL, SURFACE OR CHAINHUNG

POLE MOUNTED FIXTURE

LIGHTED BOLLARD

PENDANT FIXTURE; HIGH BAY, LOW BAY, DECORATIVE

EXIT SIGN - WALL MOUNT, CEILING MOUNT. ARROWINDICATES DIRECTION OF TRAVEL, SHADING INDICATESLIGHTED FACE.

EMERGENCY EGRESS BATTERY PACK, WALL MOUNT ORCEILING MOUNT

WALL MOUNTED SCONCE OR WALLPACK FIXTURE

SURFACE MOUNTED DOWNLIGHT

RECESSED CAN DOWNLIGHT

RECESSED CAN WALLWASHER

TRACK LIGHTING. SEE FIXTURE SCHEDULE AND LIGHTINGPLANS.

ELECTRICAL LIGHTING FIXTURE LEGENDTELEPHONE OUTLET

VOICE-DATA OUTLET. PROVIDE PATHWAY TO ACCESSIBLE CEILING

SPACE AS SHOWN ON PLANS. CABLING BY MSU IT.

DATA OUTLET

WIRELESS ACCESS POINT, COORDINATE WITH MSU IT.

STROBE WALL MOUNT (MOUNT AT +82" AFF, UNO.) AND CEILINGMOUNT

FIRE ALARM MANUAL STATION (MOUNT AT +46" AFF, UNO.)

HORN/STROBE WALL MOUNT (MOUNT AT +82" AFF, UNO.) ANDCEILING MOUNT

SPEAKER STROBE WALL MOUNT (MOUNT AT +82" AFF, UNO.) ANDCEILING MOUNT

SPEAKER, COORDINATE WITH MSU IT.

ELECTRICAL SYSTEM LEGEND

WAP

ELECTRICAL PROJECT NOTESA. PRIOR TO BID CONTRACTOR SHALL VISIT THE SITE. NOT ALL WORK

REQUIRED TO COMPLETE THE PROJECT IS SHOWN ON THE DRAWINGS. THECONTRACTOR SHALL BECOME THOROUGHLY FAMILIAR WITH ALL THE WORKREQUIRED TO COMPLETE THE PROJECT IN ADDITION TO THE LOCALCONDITIONS AND INCLUDE SAID WORK IN THE BID.

B. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OFALL ELECTRICAL SERVICE WORK WITH UTILITY. OWNER PAYS ALL FEES,CONTRACTOR DOES ALL SCHEDULING AND COORDINATION OF WORK. IT ISTHE SOLE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE ALLSCHEDULES ARE MET.

C. GENERAL WORK PRACTICES FOR ELECTRICAL CONSTRUCTION SHALL BEIN ACCORDANCE WITH NECA 1, "STANDARD PRACTICES FOR GOODWORKMANSHIP IN ELECTRICAL CONTRACTING." THIS PUBLICATION ISAVAILABLE FROM NECA BY TELEPHONE AT 301-657-3110 OR ON-LINE ATWWW.NECANET.ORG.

D. IT IS THE CONTRACTORS RESPONSIBILITY TO COORDINATE WITHMECHANICAL FOR PLENUM SPACES AND PROVIDE PLENUM RATED CABLESWHERE REQUIRED FOR LIGHTING CONTROL, DATA, FIRE ALARM AND ALLOTHER L.V. SYSTEMS NOT INSTALLED IN CONDUIT. VERIFY CONDUITREQUIREMENTS ON DRAWINGS AND SPECIFICATIONS.

E. FIRE-RESISTANCE: PROVIDE A MINIMUM HORIZONTAL DISTANCE OF 24"BETWEEN OUTLET BOXES LOCATED ON OPPOSITE SIDES OFFIRE-RESISTANCE RATED WALLS. WHERE THIS IS NOT POSSIBLE INSTALL ULLISTED PUTTY PADS ON ALL OUTLET BOXES NOT MEETING THE 24"SEPARATION. PROVIDE A UL LISTED THROUGH -PENETRATION FIRESTOPFOR PENETRATIONS OF FIRE-RESISTANCE RATED ASSEMBLIES.

F. CONDUCTORS ARE SIZED PER THE 75 DEGREE C RATING COLUMN OF NECTABLE 310.16. IF THE TERMINAL USED FOR A TERMINATION OF A PARTICULARCONDUCTOR IS NOT MARKED, OR THE TERMINAL IS MARKED FOR 60 DEGREEC CONDUCTORS, IT IS THE RESPONSIBILITY OF THE CONTRACTOR TOEITHER ADJUST THE AMPACITY OF THE CONDUCTOR TO MATCH THE 60DEGREE COLUMN OF TABLE 310.16, OR REPLACE THE TERMINAL WITH ONERATED FOR AT LEAST 75 DEGREES C

G. FOR 20A BRANCH CIRCUIT RUNS EXTENDING BEYOND 300 LINEAR FEET.CONDUCTOR SIZE SHALL BE A MINIMUM OF #10 CU.

H. PROVIDE A DEDICATED NEUTRAL CONDUCTOR FOR EACH 120V BRANCHCIRCUIT.

I. DURING DEMOLITION, THE CONTRACTOR SHALL NOTE ALL EXISTINGRACEWAY (BOTH SURFACE AND CONCEALED) TO THE EXTENT POSSIBLE.THESE RACEWAYS SHALL BE REUSED TO THE GREATEST EXTENT POSSIBLETO INSURE A CLEAN FINISHED PRODUCT. WHERE PRACTICAL, AND ALLOWEDPER CODE, FISHING THROUGH WALLS WITH MC CABLE IS PREFERRED TOSURFACE-MOUNTED CONDUIT.

J. CONTRACTOR SHALL REMOVE, TRANSPORT, AND LEGALLY DISPOSE OFLAMPS AND BALLASTS OFF-SITE. IT IS ASSUMED THE THE BALLASTS DO NOTCONTAIN PCBs. THE CONTRACTOR SHALL NOTIFY THE OWNER IMMEDIATELYIF IT IS SUSPECTED THAT BALLASTS CONTAIN PCBs.

K. ALL POWER INTERRUPTIONS SHALL BE COORDINATED WITH OWNER. ANYDISRUPTION OF WORKERS IN THE SPACE SHALL BE KEPT TO A MINIMUM ANDBE COORDINATED WITH THE OWNER PRIOR TO WORK COMMENCING IN THATSPACE.

L. ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF ANYEXISTING CIRCUITS THAT ARE INTENDED TO REMAIN THAT ARE SAW CUT ORINTERRUPTED AS PART OF THE DEMOLITION PROCESS. PROVISION FOR THISWORK SHALL BE INCLUDED IN THE BID. SUCH CIRCUITS INCLUDE BUT ARENOT LIMITED TO: INTERIOR RECEPTACLE CIRCUITS, INTERIOR LIGHTINGCIRCUITS, EXTERIOR BUILDING LIGHTING, SITE LIGHTING, ETC.

M. ELECTRICAL DRAWINGS SHOWING EXISTING BUILDING CONDITIONS,SUCH AS DEMOLITION DRAWINGS, EXISTING PANEL SCHEDULES, ETC AREBASED ON RECORD DRAWINGS AND SITE VISITS. IF ACTUAL EXISTINGCONDITIONS DIFFER FROM THOSE SHOWN ON DRAWINGS, PLEASE NOTIFYENGINEER.

A, AMP AMPERES

AC ALTERNATING CURRENT

A/C AIR CONDITIONING

AF AMP FUSE

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AHU AIR HANDLING UNIT

AL ALUMINUM

AS AMP SWITCH

ATS AUTOMATIC TRANSFER SWITCH

BAS BUILDING AUTOMATION SYSTEM

BKR BREAKER

C RACEWAY/CONDUIT

CB CIRCUIT BREAKER

CCTV CLOSED CIRCUIT TELEVISION

CKT CIRCUIT

CLG CEILING

C.O. RACEWAY/CONDUIT ONLY, WITH PULL STRING

CNTRL CONTROL

CU COPPER

DISC DISCONNECT

DIST DISTRIBUTION

DPDT DOUBLE POLE DOUBLE THROW

DWG DRAWING

EA EACH

EF EXHAUST FAN

ELEC ELECTRIC

EMT ELECTRICAL METALLIC TUBING

EQUIP EQUIPMENT

EX, EXIST EXISTING

FA FIRE ALARM

FACP FIRE ALARM CONTROL PANEL

FATC FIRE ALARM TERMINAL CABINET

FD FUSED DISCONNECT

FIDS FLIGHT INFORMATION DISPLAY SYSTEM

FLR FLOOR

FO FIBER OPTIC

FVNR FULL VOLTAGE NON-REVERSING

FVR FULL VOLTAGE REVERSING

GEC GROUNDED ELECTRODE CONDUCTOR

GFI GROUND FAULT INTERRUPTER

GND GROUND

GRC GALVANIZED RIGID CONDUIT

HID HIGH INTENSITY DISCHARGE

HOA HAND-OFF-AUTOMATIC

HP HORSEPOWER

HPS HIGH PRESSURE SODIUM

HTR HEATER

HVAC HEATING, VENTILATING & AIR CONDITIONING

HZ HERTZ

J-BOX JUNCTION BOX

KVA KILOVOLT AMPERES

KW KILOWATTS

LTG LIGHTING

LPW LUMENS PER WATT

MAG MAGNETIC STARTER

MAN MANUAL

MAX MAXIMUM

MCC MOTOR CONTROL CENTER

MDP MAIN DISTRIBUTION PANEL

MECH MECHANICAL

MH METAL HALIDE

MIN MINIMUM

MSS MOTOR STARTER SWITCH

N NEUTRAL

NC NORMALLY CLOSED

NEC NATIONAL ELECTRICAL CODE

NEMA NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION

NFD NON-FUSED DISCONNECT

NIC NOT IN CONTRACT

NO NORMALLY OPEN

# NUMBER

OAE OR APPROVED EQUAL

OC ON CENTER

OCPD OVERCURRENT PROTECTION DEVICE

OH OVERHEAD

P POLE

PB PUSHBUTTON

PNL PANEL

PS POWER SUPPLY

PVC POLYVINYL CHLORIDE CONDUIT

PWR POWER

RECEPT RECEPTACLE

RCPT RECEPTACLE

RGS RIGID GALVANIZED STEEL

RM ROOM

RVNR REDUCED VOLTAGE NON-REVERSING

RVR REDUCED VOLTAGE REVERSING

SP SINGLE POLE TOGGLE SWITCH

SPEC SPECIFICATION

SPST SINGLE POLE SINGLE THROW

SSPB START-STOP PUSHBUTTON

SW SWITCH

SWBD SWITCHBOARD

SWGR SWITCHGEAR

TB TELEPHONE BOARD

TC TIME CLOCK

TD TIME DELAY

TEL TELEPHONE

TSP TWISTED SHIELDED PAIR

TTB TELEPHONE TERMINAL BOARD

TYP TYPICAL

UG UNDERGROUND

UH UNIT HEATER

UNO UNLESS NOTED OTHERWISE

UON UNLESS OTHERWISE NOTED

V VOLT

VA VOLT AMPERES

VFD VARIABLE FREQUENCY DRIVE

W WATTS

WP WEATHERPROOF

W/O WITHOUT

XFMR TRANSFORMER

Y WYE CONNECTED

DELTA CONNECTED

PHASE

NOTE: THESE ABBREVIATIONS COMPRISE A STANDARD LIST; NOT ALL ABBREVIATIONS APPEAR ON THIS PROJECT.

ELECTRICAL ABBREVIATIONS LEGEND

LUMINAIRE SCHEDULETYPE LAMPS DESCRIPTIONS MFR CATALOG NO. OR SERIES MOUNTING/ VOLTAGE LLF (ASSUMED) NOTES

B1 LED 1'x4' RECESSED EDGE-LIT FLAT PANELPHILIPS

DAY-BRITE1FXP38L835-4-DS-UNV-DIM RECESSED/ 120-277 0.85 1,2

B2 LED 1'x4' RECESSED EDGE-LIT FLAT PANELPHILIPS

DAY-BRITE1FXP30L835-4-DS-UNV-DIM RECESSED/ 120-277 0.85 1,2

NOTES:

1. SUBMITTED LUMINAIRE REQUIRES PRIOR APPROVAL.

2. PROVIDE FIRE-RATED DROP-OVER ENCLOSURE OR TENT LUMINAIRE TO MAINTAIN EXISTING FIRE-RATED CEILING ASSEMBLY.

GENERAL NOTE:

THE ELECTRICAL CONTRACTOR SHALL VERIFY ALL CEILING TYPES AND PROVIDE ALL REQUIRED MOUNTING ACCESSORIES. FOR FIRE-RATED CEILING ASSEMBLIES, VERIFY ALL RECESSED LUMINAIRE HOUSINGS ARE FIRE-RATED OR

PROVIDE FIRE-RATED, DROP-OVER ENCLOSURES OR TENT LUMINAIRE. VERIFY THAT DROP-OVER ENCLOSURES OR TENTS ALLOW FOR AIR SPACE AROUND LUMINAIRE PER MANUFACTURER'S RECOMMENDATIONS.

ROOM CONTROLLERLMRC-102

NEUTRAL WHT

HOT BLK120/277

LIGHTING LOAD 'a' ('c')

LIGHTING LOAD 'b' ('d')

LMDC-100OCCUPANCY

SENSOR

DLM WALLSWITCH

LMSW-102

RJ45(TYP)

LMRJ SERIESPRE-TERMINATED

CABLES.

NOTES:

-DEVICES ARE PRESET FOR PLUG n' GO™ OPERATION.

-ALL ROOMS ARE STAND ALONE.

-NUMBER OF ZONES ("a" "b" ETC) INDICATED NUMBER OF RELAYS REQUIRED IN A ROOM.

-THE ROOM CONTROLLER DEFAULTS TO MULTI-LEVEL AUTOMATIC-ON/AUTOMATIC OFF.

DLM WALLSWITCH

LMSW-102

DLM WALLSWITCH

LMSW-101

a (c)

b (d)

a (c)a (c)

b (d)

-REUSE EXISTING LIGHTING CIRCUIT IN ROOM. RE-ROUTE LINE VOLTAGE TO ROOM CONTROLLER AS REQUIRED.

IN EXPOSED FINISHED SPACES, PROVIDE CABLE IN RACEWAY.

PROVIDE LEGRAND STEEL WIREMOLD V700 SERIES OR EQUAL. RACEWAY

COLOR SHALL MATCH RACEWAY USED FOR RECEPTACLES & DATA.

SEE E100 FOR LOCATIONS & QUANTITIES

SEE E100 FOR LOCATIONS & QUANTITIES

ISS

EF

OR

P

LANO EN

G

INEER

ONT

MA

NA

LICENSED

GARTH L.

STEVENS

No. 11492 PE

REV. DESCRIPTION DATE

REVIEWED BY:

DRAWN BY:

SHEET

DATE

SHEET TITLE

MO

NT

AN

AS

TA

TE

UN

IV

ER

SIT

Y

MSU-CPDCMONTANA STATE UNIVERSITY

BOZEMAN, MONTANA

PHONE: 406.994.5413

FAX: 406.994.5665

6159.001

CL

AS

SR

OO

MR

EN

OV

AT

ION

S 2

018

RE

ID H

AL

L 3

32

-33

3 1

00

% C

ON

ST

RU

CT

ION

DR

AW

ING

S

RMGS

ELECTRICAL

ABBREVIATIONS &

SYMBOLS

E001

03/19/2018

PR

OJE

CT

#2

PPA#18-2012

N.T.S.1REID 332 & 333 LIGHTING CONTROL DIAGRAM

Page 10: J:MSU CLASSROOM REMODEL0.2 Revit ModelsReid … 302 301 304 305 306 308 309 310 311 312 313 314 355 UP DN DN UP UP DN ROOF OVER CLASSES BELOW UP UP REID 333-332 PROJECT LOCATION dRA

LV

LV

LV

OSOS OS

R2R2

LV

3 3

3 3

33

33

A B C D E F

3

4

5

b b b b

bbbb

b b b b

aaaa

ab

c c c c c

d

d d

d d

dd

ddd

d d

d d

cd

cd

d

a

1 TYP.

B2

B2

B2

B2

B2

B2

B2

B2

B1 B1

B1 B1

B1 B1

B1 B1

B1

B1

B1

B1

B1

B1

B1

B1

B1

B1

B1

B1

B1

B1

B1

B1

B1

B1

B1

B1

REID

333

REID

332

22

GENERAL ELECTRICAL NOTESA. ELECTRICAL DEVICES AND LIGHTS SHOWN IN GREY ARE EXISTING TO

REMAIN. ELECTRICAL DEVICES AND LIGHTS SHOWN IN DASHED BLACK & SPECIFICALLY NOTED AS 'DEMO' ARE TO BE DEMOLISHED, UNO.

B. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO COORDINATE WITH EACH OTHER AND VERIFY THAT THERE ARE NO CONFLICTS IN LOCATION OF DUCTS, CONDUITS, DIFFUSERS, BOXES, AND OTHER ITEMS THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT OF MATERIALS.

C. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING OF FLOORS, WALLS, CEILINGS, AND ROOFS TO PERFORM THE REQUIRED WORK DEPICTED IN THESE DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR ALL PATCHING OF HOLES TO THE SATISFACTION OF THE ARCHITECT/ENGINEER.

KEY NOTES:#

A B C D E F

3

4

5

DEMO (TYP. 16) DEMO (TYP. 16)

DEMO

DEMO DEMO

DEMO

DEMO

DEMO

DEMO

DEMO

DEMO

ISS

EF

OR

P

LANO EN

G

INEER

ONT

MA

NA

LICENSED

GARTH L.

STEVENS

No. 11492 PE

REV. DESCRIPTION DATE

REVIEWED BY:

DRAWN BY:

SHEET

DATE

SHEET TITLE

MO

NT

AN

AS

TA

TE

UN

IV

ER

SIT

Y

MSU-CPDCMONTANA STATE UNIVERSITY

BOZEMAN, MONTANA

PHONE: 406.994.5413

FAX: 406.994.5665

6159.001

CL

AS

SR

OO

MR

EN

OV

AT

ION

S 2

018

RE

ID H

AL

L 3

32

-33

3 1

00

% C

ON

ST

RU

CT

ION

DR

AW

ING

S

RMGS

ELECTRICAL

LIGHTING PLAN

E100

03/19/2018

PR

OJE

CT

#2

PPA#18-2012

3/16" = 1'-0"2REID 332 & 333 LIGHTING RENOVATION PLAN

3/16" = 1'-0"1REID 332 & 333 LIGHTING DEMOLITION PLAN

1 ALL NEW LIGHTING SHALL BE CIRCUITED VIA EXISTING BRANCH CIRCUIT PREVIOUSLY USED FOR LIGHTING WITHIN THE SPACE, WITH NEW CONTROLS. SEE SHEET E001 FOR LUMINAIRE SCHEDULE AND LIGHTING CONTROL DIAGRAM.

CEILING ACCESS PANEL; SEE ARCHITECTURAL PLANS FOR EXACT LOCATION & DETAILS.

2

Page 11: J:MSU CLASSROOM REMODEL0.2 Revit ModelsReid … 302 301 304 305 306 308 309 310 311 312 313 314 355 UP DN DN UP UP DN ROOF OVER CLASSES BELOW UP UP REID 333-332 PROJECT LOCATION dRA

WAP WAP

J

TV

J

TV

TV TV

TV

TVS S S S

TV

TV

J

J

WAP WAP

A B C D E F

3

4

5

NEW WIREMOLD SYSTEM

PROJECTOR

NEW WIREMOLD SYSTEM

PROJECTOR

EXISTING PANEL 'P1'

1

1

1

1

1

1

3

2

REID

333

REID

332

3

P1-8 P1-8

P1-2 P1-2 P1-2

P1-2

P1-2

P1-4

P1-4

P1-4

P1-10

P1-10P1-10

P1-10

P1-10 P1-10P1-9

4

P1-7

P1-7

P1-7

P1-7

P1-7

P1-9P1-9

P1-9

P1-9

5

6

1

12

10

10

7 7 7 7

11 11

NEW WIREMOLD SYSTEM2

GENERAL ELECTRICAL NOTESA. ELECTRICAL DEVICES AND LIGHTS SHOWN IN GREY ARE EXISTING TO

REMAIN. ELECTRICAL DEVICES AND LIGHTS SHOWN IN DASHED BLACK & SPECIFICALLY NOTED AS 'DEMO' ARE TO BE DEMOLISHED, UNO.

B. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO COORDINATE WITH EACH OTHER AND VERIFY THAT THERE ARE NO CONFLICTS IN LOCATION OF DUCTS, CONDUITS, DIFFUSERS, BOXES, AND OTHER ITEMS THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT OF MATERIALS.

C. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING OF FLOORS, WALLS, CEILINGS, AND ROOFS TO PERFORM THE REQUIRED WORK DEPICTED IN THESE DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR ALL PATCHING OF HOLES TO THE SATISFACTION OF THE ARCHITECT/ENGINEER.

A B C D E F

3

4

5

EXISTING ELECTRICAL PANEL

'P1' TO REMAINDEMO WIREMOLD

DEMO WIREMOLDPROJECTOR (DEMO)

PROJECTOR (DEMO)

DEMO

DEMO

DEMO

DEMO

DEMO

DEMO

DEMO

DEMO

DEMO DEMO

DEMO DEMO

EXISTING WIRELESS ACCESS POINT TO REMAIN

EXISTING WIRELESS ACCESS POINT TO REMAIN

DEMO DEMO DEMO DEMO DEMO

DEMO DEMO DEMO DEMO

DEMO

DEMO

4

8

9

9

99999

9

9 9 9 9

9

9

9

9

88

8

8

8

8 8

8

8

8

8

8

DEMO

DEMO

DEMO

DEMO

DEMO

DEMO

DEMODEMO

9

9

9 9

9

99

8

KEY NOTES:#

NOTES:1. FIELD VERIFY FINAL LOCATION. COORDINATE WITH PODIUM AND MSU IT.2. PAINT VERTICAL WALL CHANNEL TO MATCH WALL COLOR.3. WHERE SHOWN ON PLAN, PROVIDE 90 DEGREE IN-CARPET TURN AS REQUIRED: CONNECTRAC IN-C90-GR, OR EQUAL.4. INCLUDE ALL REQUIRED COMPONENTS AND MANUFATURER ACCESSORIES FOR A COMPLETE SYSTEM.

END COMPONENT AS REQUIRED: CONNECTRAC IN-EC, OR EQUAL.

AV/DUPLEX RECEPTACLE COMBO BOX: CONNECTRAC

PS-A-288, OR EQUAL. IN-CARPET WIREWAY: CONNECTRAC IN-048-GR,

OR EQUAL

VERTICAL WALL CHANNEL TO CEILING: CONNECTRAC

AC-WC-144-AL, OR EQUAL

WALL

FLOOR

ISS

EF

OR

P

LANO EN

G

INEER

ONT

MA

NA

LICENSED

GARTH L.

STEVENS

No. 11492 PE

REV. DESCRIPTION DATE

REVIEWED BY:

DRAWN BY:

SHEET

DATE

SHEET TITLE

MO

NT

AN

AS

TA

TE

UN

IV

ER

SIT

Y

MSU-CPDCMONTANA STATE UNIVERSITY

BOZEMAN, MONTANA

PHONE: 406.994.5413

FAX: 406.994.5665

6159.001

CL

AS

SR

OO

MR

EN

OV

AT

ION

S 2

018

RE

ID H

AL

L 3

32

-33

3 1

00

% C

ON

ST

RU

CT

ION

DR

AW

ING

S

RMGS

ELECTRICAL POWER

& SIGNAL PLAN

E200

03/19/2018

PR

OJE

CT

#2

PPA#18-2012

3/16" = 1'-0"3REID 332 & 333 ELECTRICAL RENOVATION PLAN

3/16" = 1'-0"2REID 332 & 333 ELECTRICAL DEMOLITION PLAN

1 COORDINATE MOUNTING HEIGHT FOR COMBO DATA / DUPLUX RECEPTACLE BOX WITH TV DISPLAY. ROUTE RACEWAY (LEGRAND STEEL WIREMOLD 2400D SERIES, OR EQUAL) VERTICALLY FROM CEILING ABOVE.

PROVIDE SURFACE-MOUNT RACEWAY FOR ALL NEW RECEPTACLES SHOWN. SEE ARCHITECTURAL PLANS FOR MOUNTING HEIGHT OF RACEWAY & RECEPTACLES. BASE BID: PROVIDE LEGRAND STEEL WIREMOLD V700 SERIES. ALTERNATE BID: PROVIDE LEGRAND STEEL WIREMOLD 3000 SERIES.

PROVIDE IN-CARPET & VERTICAL WIREWAY SYSTEM PER DETAIL 1 ON THIS SHEET.

AFTER DEMOLITION, THERE WILL BE (4) 20A 1P BREAKERS (CKTS 2,4,7, & 9) AVAILABLE IN EXISTING PANEL 'P1' TO SERVE NEW LOADS AS SHOWN. PROVIDE (2) NEW 20A 1P BREAKERS (CKTS 8 & 10) FOR NEW LOADS. EXISTING PANEL IS A SQUARE D NQOD PANELBOARD.

PROVIDE VERTICAL WIREMOLD FROM CEILING AT THIS CORNER TO FEED HORIZONTAL RUN OF WIREMOLD.

PROVIDE RECESSED FEEDER FROM EXISTING ELECTRICAL PANEL TO NEW RACEWAY IN BOTH ROOMS. UTILIZE NEW INFILL WALL TO KEEP FEEDER CONCEALED.

COORDINATE EXACT LOCATION OF NEW SPEAKER WITH MSU IT. PROVIDE SURFACE-MOUNT RACEWAY (LEGRAND STEEL WIREMOLD V700 SERIES) FROM NEW SPEAKER LOCATION UP TO ACCESSIBLE CEILING SPACE. PROVIDE PULL STRING FOR CABLING.

COORDINATE DEMO OF DATA DEVICE, WIREMOLD, & WIRING WITH MSU IT.

REMOVE EXISTING DEVICE, WIREMOLD, AND IT'S CIRCUIT, BACK TO NEAREST UPSTREAM DEVICE TO MAINTAIN ORIGINAL CIRCUIT CONTINUITY.

REPLACE EXISTING DEVICE & COVERPLACE WITH NEW WHITE DEVICE & COVERPLATE.

CONCEAL FEEDER TO NEW PROJECTOR ABOVE CEILING.

2

3

4

5

N.T.S.1ELECTRICAL IN-CARPET & VERTICAL WIREWAY DETAIL

6

7

8

9

10

11