c OUR REF: ( ) 1n EP2/H4/S3/15 Pt.42 Environmental Protection Department YOUR REF· TEL. NO.. 2835 1122 III>Z: flHI Branch Office 28th Floor, Southorn Centre, ff l!ii J\tl FAX NO 2591 0558 130 Hennessy Road, E-MAIL· Wan Chai, Hong Kong iJl: HOMEPAGE· http"llwww.epd gov hk {¥'\ August 2016 By Registered Post & Fax 2877 1522 China State- Build King Joint Venture 29/F China Overseas Building. 139 IJennessy Road. Wan Chai, Hong Kong (Attn: Mr. Keith TSE- Site Agent) Dear Mr. TSE, Environmental Impact Assessment (EIA) Ordinance, Cap.499 Application for Further Environmental Permit (Application No.: FEP-171/2016) Pro,ject Title: Wan Chai Development Phase 11- Central- Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Works refer to yo ur abo\'e application received on 26 July 2016 f01· further em ironmental permit under Section 12(1) of the EIA Ordinance. Pursuant to Section 12(3) or the EIA Ordinance. I now I SS Ue th e attached Fut1her Em ironmental Pem1it (No. FEP-12/364/2009/D) for )OUr use . Under Section 15 or the EIA Ord in ance. the Further Environmental Permit ,., · ill be placed on the EIA Ordinance Register. 11 will also be placed on the EIA Ordinance website (http://www.epd.gov .h.k/ eia/). Please note that if you are aggrieved by any ofthe condi ti ons impo sed in thi s Permit. you ma y appeal under Section 17 oft he EtA Ord inance within 30 days ofreceipt of this Permit. hould you have any queries on the above application. please contact my colleague Mr. Richard Wong at 2835 11 28. Yours sincerely. Principal Environmental Protection Officer for Director of Envi ro nm ental Protection

Upload: others

Post on 04-Aug-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: :Jn - EPD · 2016. 12. 14. · referenced ( 19) in Ax(-1) to EP2/H4 'C/09 11. 7. Environmental Permit Issued - Permit No.: EP-356/2009 issued to Civil Engineering and Development

c 2i-~HI~ OUR REF ( ) 1n EP2H4S315 Pt42 Environmental Protection Department fimt~~5J~ PR~tl~(lt YOUR REFmiddot ~ ~5 TEL NO 2835 1122 IIIgtZflHI

Branch Office

28th Floor Southorn Centre

~e~H ffJE~j lii -EE~t-~~ f~~ tp ttlJtl

FAX NO 2591 0558 130 Hennessy Road ~T-~Wt E-MAILmiddot Wan Chai Hong Kong

~ iJl HOMEPAGEmiddot httpllwwwepd gov hk

yen August 2016

By Registered Post amp Fax 2877 1522 China State- Build King Joint Venture 29F China Overseas Building 139 I Jennessy Road Wan Chai Hong Kong

(Attn Mr Keith TSE- Site Agent)

Dear Mr TSE Environmental Impact Assessment (EIA) Ordinance Cap499

Application for Further Environmental Permit (Application No FEP-1712016)

Project Title Wan Chai Development Phase 11- Central- Wan Chai Bypass at Wan Chai West (Contract No HK201208) - Tunnel Works

refer to your aboe application received on 26 July 2016 f01middot further em ironmental permit under Section 12(1) of the EIA Ordinance

Pursuant to Section 12(3) or the EIA Ordinance I now ISSUe the attached Fut1her Em ironmental Pem1it (No FEP-123642009D) for )OUr use

Under Section 15 or the EIA Ordinance the Further Environmental Permit middotill be placed on the EIA Ordinance Register 11 will also be placed on the EIA Ordinance website (httpwwwepdgovhkeia)

Please note that if you are aggrieved by any ofthe conditions imposed in thi s Permit you may appeal under Section 17 ofthe EtA Ord inance within 30 days ofreceipt of this Permit

hould you have any queries on the above application please contact my col league Mr Richard Wong at 2835 1128

Yours sincerely

~~kJn Principal Environmental Protection Officer

for Director of Envi ronmental Protection

c bcc wencl S[RS]4

c Environmental Permit No

ffJ ~~r oJillf~511t FEP-1236-+12009D FEP-1 23642009D

ENVIRONMENTAL IMPACT ASSESSMENT ORDINANCE (CHAPTER 499) Sections I 0 amp 12

~m~~gsjf~f~f9l (~499~)

~ 1 0amp12~

FURTHER ENVIRONMENTAL PERMIT TO CONSTRUCT A DESIGNATED PROJECT

PART A (MAIN PERMIT) At5j3 (WfOJ~plusmn~t5J35)

Pursuant to Sections I0 and 12 of the Environmental Impact Assessment Ordinance (El AO) the Director of Environmental Protection (the Director) grants this fUJiher environmental permit to China Stale - Build King Joint Venture (Chine State Construction Engineering (Hong Kong) Limited and Build King Civi l Engineering Limited as partners) (hereinaft er referred to as the Permit Holder) to construct the designated proj ect described in Patt B subject to the conditions specified in Part C The issue of this further environmemal permit is based on the documents approvals or permissions described below

tr~ ~ fRJl middotf~ ~J1 f1i (tf JI] (f~~FMRf91J )~ IO(IFamp 12fJW~mA middot ~JQ fyen~fjW~ lt Wffi )Jlfr 1~JrA~~tftriF or mm T 1 1 ~7~ - fiJ 2ifil[ti~ c iJ ~~~ ~r~I ti c fl~H-rFgtti z~ riJraquo f l~J ctpound~ r~~nJt ~s f-A) c f fill g~ ufrrf t4 1J A ) middot t)~iZi B h9lrJT f~U~Hl~i~ )1J~irfl F1 middot fJm~ ltT~J5JT i1JfY Jf~fiJfdt 1qfr f1~f~ JJI ilf o1 iiTf rf fldl~ 1middot 91 X ft- ttUF dU1FUJ rm ~ ~If

Application No LjJ ~ t~~~-m

FEP- 17120 16

~

Document in the Register t~~ITI A~Xft

I Ce ntral - Wan Chai Bypass and Island Eastern Corridor Link (Register No AEIAR-0-+ 12001 )

- Environmental Impact Assessment Report (July 200 I) rHereinafl er referred to as the CW BampI EC L EIA Repo rt)

- Environmental Monitoring and Audit Manual - Executive Summar)

2 The Directors letter of approval of the CWBamp IECL El A Report dated 3 I August 200 I referenced ( 19) in Ax(2) to EP2H4 A I 0 11

3

4

5

Wan Chai Development Phase 11 and Central-Wan Chai Bypass (Register No AEIAR-1 252008)

- Environmental Impact Assessment Report (December 2007) [Hereinafter referred to as the WDIIampCWB El A Report]

- Environmental Monitoring and Audit Manual - Executive Summaty - Further information received fimiddotom the Civi l Engineering and Development

Depattment on I I March 2008 9 April 2008 and 14 November 2008 under Section 8( I) of the Environmental Impact Assessment Ordinance

The Directors letter of approval of the WDIJampCWB EIA Repon dated I I December 2008 referenced (85) in EP2H4S3 15 Pt2

Central Reclamation Phase I I I - Studies Site Investigation Des ign and Constru ction (Register No AEIAR-040200 I) ~

- Environmental Impact Assessment Report (July 200 I) 6~

- I shy

( Environmental Permit No FEP- 123642009D

fiV5Ufofill~liHft FEP-123642009D

[Hereinafter referred to as the CRI II EIA Report] - Environmental Monitoring and Audit Manual - Executive Summary

6 The Director s letter of approval of the CRI II El A Report dated 31 August 200 I referenced ( 19) in Ax(-1) to EP2H4 C09 11

7 Environmenta l Permit Issued - Permit No EP-3562009 issued to Civil Engineering and Development Department on 30 July 2009 for construction of the following designated projects (i) Permanent and temporary reclamation works including associated dredging

Orks in Wan Chai Development Phase 11 (WDI I) area (referred to as DP3 in the WDIIampCWB EIA Report)

(i i) Wan Chai East Sewage Outfall (referred to as DP5 in the WDIIampCWB EIA Report) and

(iii) Dredging for the Cross-harbour Water Mains from Wan Chai to Tsim Sha Tsui (referred to as DP6 in the WDI IampCWB EIA Report)

8 Application for Environmental Permit and attachments submitted by the Permit Holder on 27 July 2009 (Appl ication No AEP-36412009)

9 Environmental Permit (No EP-3642009) issued on 17 August 2009

10 Application documents for Variation of Environmental Permit including all attachments submitted by the Permit Holder on 28 July 20 I 0 (Application No VEP-321 20 I 0)

11 Environmental Permit issued - Permit No EP-3642009A issued on 4 August 201 0

12 Application documents for Variation of Environmental Permit including all attachments submitted by the Permit Holder on 3 1 August 20 12 (Application No VEP-374 20 12)

13 Environmental Permit issued - Permit No EP-36412009B issued on 20 September 20 12

14 Appl ication for Further Environmental Permit including all attachments submitted on 8 Februaty 20 13 (Appl icat ion No FEP- 14420 13)

15 Appl icat ion documents for Variation of Environmental Permit including all anachments submitted by the Permit Holder on 20 June 20 14 (Appl ication No VEP-44320 14)

16 Environmental Permit issued- Permit No EP-3642009C issued on 11 July 20 14

17 Appl ication documents for Variation of Environmental Permit including all attachments submitted by the Pennit Holder on 28 October 2015 (Appl ication No VEP-485120 15)

18 Environmental Perm it issued - Perm it No EP-3642009 D issued on 24 November 2015

19 Application for Further Environmental Permit including al l attachments submitted on 26 Ju ly 20 16 (Application No FEP-171 20 16)

I

- 2 -

c Environmental Permit No FEP-12136412009D

~ii~F uJ~mQfj( FEP-123642009 D

A EIAR-0~ 1200 I) - f~Jftl~~~f~~fi- (20011f7 F ) [ f ffli 1 CW Bamp I ECUf ril in ) - f~lft~~~t~ f-IRt - fl jfj 11Kl ~

~-ampti~2ool lf-8 ~ 31 H ~tHmiddotKWBampI Ec u~ ~-r yenHi 8Hlt1Hg f17 mt~ ~ ( 19) in Ax(2) to EP2l-14A 10 11

13 WHtlt~~I-Jil]~~lYlamp Jif1~middot~f~~ili (ft ~c lift ~_w ~di A EIAR-1252008) bull f~Jftl~~~middotjif~~yenfHlf (20071j- 12 =j )[ Ffilj r WDIIampCWBf~riHifi- ) bull J~fl~~15~ fllfr bull f fjfjjJij~ bull J lJf~HitHHl~P~fliifsectIJ~8 (1) (~fiU~2008 1f3 F3 11 H middot 2008lj4J=l9H amp

2008f-11 F 14 Hf1Tf)pound~~fJ~-717-Qf4

4 f-amp~~2008 11 12F3 11 H1tHmiddotHttU~ WDIIampCWB fg riJ1yen fi- A~ (Fi it-middot M~~ ~fE (85) in EP2tll4 S3115 Pt 2

5 l] 1 ItltF jmiddoti1J~ II 1 )YJ - ~111t middot ttrliJfWJ middot ~l~ImiddotW~~Nli~clliPH~fft AEIAR-0~0100 I) bull fgtffh~~~jUI~Hlf (200 11 P J=l )[ 1- jTJ 1 C RIll pound~ H-ti fi- ] bull fnmYili~Wft r-~nt bull fjjfjJJ)j~

6 f-ampti~200I 1-8F3 31 H ~ttf1 CR III~ r ii n- fl~ Jttfldf middot ~~~ pound ~-IBt lt19) in Ax(4) to EP2H4Ci09 11

7 ~lf~tfi~J~mrif uJ(Z- rif uf~(t~mffiEP-35612009 li20091p )=l30 F-1 f~middotf~J _Ljtffit~~lAilHilH HfitifilrQtJ (i) pound~i 6tk~~ jmiddotDIJB~l~JHJ k 11]i~fhyenttfij_[f~( t~HkflllfMQLl_L~)

( W D 11 amp C W B Jg ~I 1 n IJ fiTJ -- D P 3--) (ii) ~1 ( bullJ]Ij(t)l 1j(U( W D 11 ampC W B f~ rimiddotJ $U fT IAJ fjTJ middotmiddot D P 5 ) amp (iii) rf( yen tIUi~JI(Jij frrAJtQJtif~( W D 11 ampC W Big nhit fir IAJ fii

--DP6)

8 rifcJiH41T AE2009 1p )1 27 Ht~XH~r~mrifufjQLjJ~i1)ftJlfftft-U-Jlri81r ~il ~flf AEP-36~2009)

I 0 riF ufJ~H-11 Afi~20 I Ofj= 7F 28 Ht~ X A~ Jiamp~J-Qrir uf6LJrriiLZffl11~1Wiffft (j(Ljrrifillj~mm YEP-32 120 I 0)

12 jf cfrimiddot1t-1TAU~20 12J~ 8F3 31 H 1poundi~l~ rlif(f~Vffrif uf~tLjr ~i1XItlMr1T11flt ft(Ljr~j1g~~Wi YEP-37~2012)

14 j~ 2013 11- 2 I=J 8 Htpound~flmiddot~~frfi~JfRflKruftfLjr~jjXf~8frifiiT11fitfflt4J ~ri 1 f ~~lit FEP-1442013)

( Environmental Permit No FEP-1 2 3642009 D

I~ijlJfuH(g~~ft FEP-12 364 2009 D

f~(EP~ifilf~~~it VEP-44312014)

16 ~ri~~w~~JJlifuf~middot1 - ~foJ~tl~~5i1( EP -3642009C fi 2014lf7 J=l ll R ~ ~1

17 gfoJllit-trAX 20 15 f 10 E3 28 Ht~XA~JL1~~1ft~fofi(fLJ-l~fLzft-ilfrlirfT~ ~fi ff(LJ-lcii11 1 ~~~~t YEP-48520 15)

18 C~i~~R~l~JfioJillt - ~FoJ~tl~hl~ft EP-3642009D j~ 20151 ~ 11 Fl24 Hi ~

19 n~ 20 16 1f 7 J=l 26 H tE~R~trJrAJf~ricif oJ(14JJi Xft-fjfJjrtrtr~f11t-lt lfJ~j ~ ~W~ft FEP-171 20 16)

August 20 16 2016 f 8 Mt 13

Date ( en YK o g) Principal Environmental Protecti Officer HWJ for Director of Environmental Protection

r~~fw-fit1~~wamp ltHJmf~lftf~iiliplusmnff O(WiVc (-(f)

- 4shy

( Environmental Permit No FEP-1 23642009D

J~iflR1 oJ]litf~l]rff FEP-12364i200910

PART B (DESCRIPTION OF DESIGNATED PROJECT) B$ (sect~I~~ 13 89~~)

Hereunder is the description of the designated project mentioned in Part A of this environmental pennit (hereinafter referred to as the Perm it ) fYIJM4~mliJ1 uJaf( Hi4~f unampmiddotmiddot)A ~IfiTJJpoundQilfijtl1JEIfj_J~i rl l~~5ii9J

Title of Designated Proj ect Wan Chai Development Phase 11- Central - Wan Chai Bypass at Wan Chai West m~_[tP~HB~ ~ lli (Contract No HK20 1208)- Tunnel Works

-as part of the middotmiddotc entral-Wan Chai Bypass including its Road Tunnel and Slip Roads (the CWB project) which is covered in the Environmental Permit No EP-3642009 B (This designmed proj ect is hereinafter referred to as middotthe Project)

~1 HU~~LWJ shy I 1 1~~1H~~jfj - i~ i ff19H ((~~~~~lid~ilt H K20 1208) shy l~lli _[fpound

- IltItpound~ ijJ~lH f~Ut(~jiJtf jmiddot fj[ j~jlliJid2lH~lM (C wBIf2Xi F=l )RJ- yensect1 fB middot -J ~~~tfl~f1ilijrofcttl - ~middotroJift~~~m EP-3642009B A~jIJ

c -4-1f1iLt~rw n F1fJLfpoundrq t=n

Nature of Designated Project 1lli_[flfrCi HRj lmiddot1Jl

The Project is a part of the Central-Wan Chai Bypass project (The CWB project will involve construction of a trunk road and its road tunnel more than 800m length between portals)

JltIf~Jfi HJJ 1 l 1 f~i1f S~Ht1I]Erri HA~ - iil~M (C wBJJpoundIC1 HJvfl~~l1- fiU ~1~lliJ_JAu~IL~RmiddotJft~MliM800I~A~f r middotrj[~jill )

Location of Designated Project Wan Chai West harbour-front area Hong Kong 1ilJtJJPtl H A~tttl~ The location ofthe Project is shovn in Fi gures la and lb of this Permit

-~~]~( (pgPj )

_[tJLJ(j HA~tttrlill~ f~fj~ 4~f oft] IN] Iaamp_IN] I b[AJ

Scale and Scope of Designated Project fi=iitLt~PCi 1-J A~tflttHJJitlli[l

The scope of the Project mainly includes bull construction ofa du al three-lane trunk road tunnel of approx imate) 3 1 Om in

length (including the substructure of Middle Ventilation Building) and two slip roads

(part of the CWB project )

Remark s

bull The permanent and temporary reclamation and associated dredging orks re lated to the CWB construction are separately covered by the environmental perm it No EP-35612009 issued to the Civil Engineering and Development Department (CEDD)

I j=~rfi jj A~iuiltj plusmn~hltk bull ~~fll-(lt~J 3 I oj~FI~-=~~ E_(rJ ( f rjj~flli li1~ 1 I )4illiR~ktlJlfigJt11Fi) U

Bt~~~~

(CWB_LtJIJDHH~ - 15f M )

iW1l ijm~i Jfkilifl1tDfltl~ ~k ~o~~MBrttfiJI fECf2lJr5tfi~tr~JtL1poundgt J- _L lhlHi ll~llR-J~lfitif oJmUiFoHtW~lJ11[ EP-3562009)

- 5 shy

( Environmental Permit No FEP-1213642009D

f~fflWF ufafi~~~ilt FEP-1 236412009D

PART C (PERMJT CONDITIONS)

1 General Conditions

11 The Permit Holder and any person Ori--ing on the Project shall comply with a ll condit ions set out in thi s Permit Any non-compliance b) any person may constitute a contravention of the Environmenta l Impact Assessment Ordinance (E IAO) (Cap499) and may become the subject of appropriate action being taken under the Ordinance

12 The Permit Holder shall ensure fu ll compliance with al l legis lation from time to time in force including ithout limi tation to the Ai r Pollution Control Ord inance (Cap 3 11 ) Water Pollution Contro l Ordi nance (Cap 358) Noise Control Ordinance (Cap 400) and Waste Disposa l Ord inance (Cap 3 54) This Perm it does not of itself constitute any ground of defense aga inst any proceed ings instituted under any legislation or imp ly any approva l under an) legislation

13 The Permit Holder shall make copies of this Permit together with a ll documents referred to in this Permit and the documents referred to in Part A of this Permit read ily available at all times for inspect ion by the Di rector or his authori zed officers at all sitesoffice covered by th is Perm it Any reference to the Permit shall incl ude a ll documents referred to in the Permit and also the relevant documents in the Register

I4 The Permit Holder shall give a copy of this Permit to the person(s) in charge of the site(s) and ensure that such person(s) ful ly understa nds all cond it ions and all req uirements incorporated by the Permit The site(s) refers to site(s) of construction of the Project and shall mean the same hereafter

15 The Permit Holder shall d isplay conspicuously a copy of this Permit on the construct ion site(s) at a I I eh icular site entrancesex its or at a convenient location for pub I ic middot s information at a 11 times The Permit Holder shall ensure that the most updated in formation about the Permi t including any amended Permit is di sp layed at such locat ions If the Permit Holder surrenders a part or the whole of this Permit the notice he sends to the Director shall also be displayed at the same locations as the original Permit The suspended varied or cance ll ed Permit shall be removed from disp lay at the construction site(s)

16 The Permit Holder shal l construct the Project in accordance with the project description in Part B of this Perm it (hereafter referred to as the Project)

17 The Permit Holder shal l ensu re that the Project is designed and constructed in accordance ith the middot relevant information and recommenda tions described in the approved CWBampIECL EIA Report (Register No AEIAR-04 1 200 I) the approved WDIIampCWB El A Report (Register No AEIA R- 1252008) the approved CRIII El A Report (Register No AEIAR-040200 I) the app lication documents for environmenta l perm it other relevant documents in the Regi ster and the information or mitigation measures described in this Permit and mitigation measu res to be recommended in submissions that shal l be deposited vi th or approved by the Director as a result of perm it condit ions contained in this Permit and mitigation measures to be recommend ed under on-going surveillance and monitorin g activit ies during a ll stages of the Project Where recommendations referred to in the documents of the Register are not expressly referred to in thi s Permit such recommendations are nevertheless to be implemented unless express) exc luded or impliedly amended in thi s Permit The Project is part of the CWB project

18 Al l deposited subm issions as required under thi s Permit shall be rect ified and

- 6shy

( Environmental Permit No FEP-12364 1200910

f~~~F uJm~5J1t FEP- 12364200910

accordance ith the comments if any made by the Director within one month of the receipt of the Director s comments or otherwise specified by the Director

19 All submiss ions approved by the Director all submissions deposited withou t comments by the Director or al l su bmissions rectified in accordance ith comments by the Director under this Permit shall be construed as part of the permit cond itions described in Pan C of th is Permit Any variation of the submissions shall be approved by the Director in writ ing or as prescribed in the relevant permit cond itions Any non-compliance ith the submissions may constitute a contra ention of the Em ironmental Impact Assessment Ordinance (Cap499) All submissions or any variation of the submiss ions shall be certified by the Environmenta l Team (ET) Leader and verified by the Independen t Environmental Checker (IEC) employed for the CWB project before submitting to the Director under this permit (see note 7)

110 The Perm it Holder shall release all final ized submissions as required under this Permit to the publ ic by depositing copies in the Environmenta l Impact Assessment Ordinance Register Offi ce or in any other places or any internet websites as specified by the Director or by any oth er means as specified by the Director for publi c inspection For this purpose the Permit Holder sha ll provide sufficient copies of the submiss ions

111 All submissions to the Director required under this Permit shall be delivered either in person or by registered ma il to the Environmenta l Im pact Assessment Ord inance Register Office (cu rrently at 27 F Southern Cen tre 130 Hennessy Road Wanchai Hong Kong) Electronic copie of al l fina lized submiss ions required under this Permit shall be prepared in H) per Text Markup Language (HTML) (version 40 or later) and in Portable Document Formflt (PDF version 40 or later) unless othem ise agreed by the Director and slull l be submitted at the same time as the hard copies

2 Special Conditions

2 1-22 fNot Used]

Environmenta l Project Committee (ENPC)

23 To Oe rsee and fac ilitate effecti ve contro l of the cumul ative environmental im pacts arising from potential multiple contracts for the construction of the en ti re Wan Chai Development Phase 11 (WDII ) and Central-Wan Chai Bypass (CWB) (hereafter referred to as the who le Project) the Permit Holder shall take part as a member of Envi ronmental Project Committee (EN PC) set up for the hole proj ect (see note 8)

The ENPC shall make recommendation to enhance the monitoring and aud it of the em iron mental performance of the whole project and other relevflnt nea rby projects on top of requi rements as set out in Conditions 31 to 42 of this Permit or corresponding set out under subsequent Environmental Permits issued for the hole project and other relevant nearby projects (see notes 7 and 8)

24 -28 [Not Used]

Measu1middotes to Mitigate Constn1ction Noise Impact

29

( Environmental Permit No FEP-12364 12009D

f~fflXr wJ ~ft~~~m FEP-1213642009 0

two weeks prior to the commencement of construction of the corresponding component(s) of the Proj ect four hard copies and one electroni c copy of the construction noise management pl an consisting of la) out plan(s) in the scale of I 1000 or other appropriate scal e and explanatory statement(s) showing the noise mitigat ion measures to include the use of movabletemporary noise barriers the use of quiet po~ered mechanical equipments and the adopt ion of multiple-phase construction schedules where appropriate The submission(s) shall be ceriified by the ET Leader and verified by the I EC as conforming to the relevant inform ation and recommendations contained in the apprO ed CWBamplECL El A Report (Register No AEIAR-OJI 200 I) and the WDII ampCWB EIA Report (Register No AEIAR-1252008) before deposit ~ith the Di rector All measures recommended in the fi nalised submission(s) under th is Condition shall be full y and proper) implemented Measures co ered by other pollution control Ord inances hall not be included in this construction noise management plan (see note 8)

2 I 0 -2 13 [Not Used]

Measures to Mitigate Landscape and Visual Impact

214 To reduce the landsca pe and visua l impact during construction stage of the Project the Permit Holder shall implement a series of landscape and isualm itigati on measures The Permit Holder shall at least one month before the commencement of corresponding parts of landscape works of th e Project deposit with the Director four hard cop ies and one electronic copy of landscape plan(s) The landscape plan(s) sha ll show th e design detail s locations implementation programme maintenance and management schedules and drm ings in the sca le of 1 I 000 or other appropriate sca le of the landscape and visual mit igation measures of th e Project Before submission to the Director the landscape plan(s) shall be cer1ified by the ET Leader and verified by the I EC as conforming to the relevant in formation and recommendat ions contained in the apprOed CWBampIECL EIA Report (Regi ter No AEIAR-0412001) and the WDII ampCWB ElA Report (Register No A El A R-1252008) A 11 measures recommended in the fin a I ised su b m ission(s) under th is Condition shall be fu lly and properly implemented (see note 8)

3 Environmental Monitoring and Audit Requirements

31 The EMampA programme shall be implemented in accordance ith the procedures and requirements as set out in the updated EMampA Manual approved for the CWB project (See note 8) An) major changes to the programme shall be justified by the ET Leader and verifi ed by the IEC employed for the CWB project (see note 7) as conforming to the information and requirements contained in the updated EMampA Manua l

32 Samples measurements and necessary remed ial actions shall be taken in accordance with the requirements of the updated EMampA Manual for the CWB project (note 8) by (a) conducting baseline env ironmental monitoring (b) conducting impact monitoring (c) carrying out remedia l actions described in EventAction Plans of the updated EMampA

Manual in accordance with the time frames set out in EventAction Plans or as agreed by the Director in case here specified criteria in the updated EMampA Man ual approved are exceeded and

(d) logging and keeping records of deta ils of (a) to (c) above for a ll parameters within 3 working days of co llection of data or completi on of remedial action(s) for the purpose of preparing and submitting the monthly EMampA Reports and to make avai lab le for inspection

- 8 shy

c Environmental Permit No FEP-12364 middot2009tD

f~JR~fufiiftf~t FEP-1 2 36-+120090

33 [Not Used]

34 Four hard copies and one electronic copy of monthly EMampA Report shall be submitted to the Director Vithin I 0 working days after th e end of each reporting month The EMampA Report s shall inc lude a summary of all non-compl iance (exceedances) of th e envi ronmental quality performance limits (Action and Limit Levels) In compiling this monthly EMampA Report all relevant cumulative const ruction impacts due to concurrent activi ties of the concurrent projects includ ing the Cen tral Reclamation Phase Ill and the Wan Chai Demiddotelopment Phase 11 projects shall be addressed The submiss ions shal l be verified by the IEC emplo)ed for the CWB project (see note 8) Addit ional copies of the submiss ion sha ll be prO ided to the Director upon request by the Director

35 Al l env ironmental monitoring and audit data submitted under this Perm it shal l be true alid and correct

4 Elecflmiddotonic Reporting of EMampA Information

f I To facil itate public inspection of th e Baseline Monitoring Report and regu lar EMampA Reports ia the EIAO Internet Webs ite and at the EJAO Register OITice electronic copies of these Reports shall be prepared in Hyper Text Markup Language (HTML) (version 40 or later) and in Portable Document Format (PDF version -LO or later) unless otherwise agreed by the Director and shall be submitted at the same time as the hardcop ies a described in Condition 34 of th is Permit For the I-ITML version a content page capable of providing h) per ink to each section and sub-section of these Reports shall be included in the beginning of the document H) per inks to all figures drawings and tab les in these Reports shall be provided in the main text from here the respective references are made All graphics in these Reports shall be in interl aced GIF format unless otherwise agreed by the Director The content of the electronic copies of these Reports must be the same as the hardcopies

42 All ellmiddotironmentalmonitori ng data desc ribed in Condition 41 above shall be made a ailablc to the public ia a dedicated eb site to be set up for the CWB project (see note 9) in the shortest practicable time and in no event later than two vveeks after the relevant ell ironmentalmonitoring data are co llected or become ava il able unless othen ise agreed with th e Director

Notes

I This Permit consists of three parts namely PART A (Main Permit) PART B (Descript ion of Designated Project) and PART C (Perm it Conditions) Any person relying on th is perm it should obtain independent legal advice on the lega l implicat ions under the Ordinance and the fo llowing notes are for genera l info rmation only

2 If there is a breach of any conditions of this Permit the Director or his authorized officer ma) ~ ith the consent of the Secretar for the Environment order the cessat ion of associated work unti I the remedia l action is taken in respect of the resultant em ironmental damage and in that case the Permit Holder shall not carry out any associated works without the permiss ion of the Director or his authorized offi cer

3 The Permit Holder ma) apply under Sect ion 13 of th e Ordinance to the Director for a variation of the conditions of this Permit The Permit Holder shall replace the original permit di splayed on the construction site b) the amended perm it

4 A person who assumes the responsibility for the vvhole or a part of the designated project(s) may

- 9shy

c Environmental Permit No FEP- I 2 3642009 D

fftffl~jur-q~~~middot1pound FEP-12364 2009 0

before he assumes responsibilit) of the designated project(s) appl) under Section 12 of the Ordinance to the Di rector for a further ell ironmental permit

5 Under Section 14 of the Ordinance the Director ma~ ith the consent of the ecretary for the Environment suspend var or cancel this Permit The suspended varied or cancelled Permit shall be removed from displa) at the construction site

6 If this Permit is cancelled or surrendered during construction of th e Project another em ironmental permit must be obtained under the Ordinance before the Project could be continued lt is an offence under secti on 26( I) of the Ordinance to construct or operate a designated project li sted in Part I of schedule 2 of the Ordinance v ithout a va lid environmental permit

7 Higlm ays Department (H) D) the Holder of Env ironmental Permit (EP) No EP-3642009 is requ ired under EP-3642009 or any subsequent EP amended b) the Director under the Ord inance (i) to establish an Em ironmental Team (ET)~ hich shall be headed b) an ET Leader (ii) to emplo) an Independent Em ironmental Checker (IEC) (i ii) to liaise ith the Holder of Em ironmcntal Permit No EP-3562009 on to jointly set up an

Environmental Project Committee (EN PC)~ and (i) to liai se with the Holder of Em ironmental Permit No EP-3562009 to jointly set up a

Communit) Liaison Group (CLG) for the CWB project

8 H) D the Holder of EP-3642009 is required under EP-3642009 or any subsequent EP amend ed by the Director under the Ordinance (i) to notify the Director in Hiting the commencement date ofconstruction of the CWB project (i i) to notify the Director the date of sett ing up the EN PC (iii) to notif) the Director the date of setting up the CLG (iv) to submit to the Director for approva l the updated Environmental Monitoring and Audit

Manual (updated EMampA Manual) () to inform the Director in riling the management organ ization of the mai n construction

companies andor any form of joint entures associated i th the construction of the CWB project

( i) to deposit ith the Director a deta iled works schedu le and locat ion plans ( ii) to deposit v ith the Director a construction noise management plan ( iii) to deposit~ ith the Director an operationa l air qual it management plan (ix) to deposit middot ith the Director landscape plan(s) (x) to depos it ~ ith the Director an addit ional mitigation plan for Slip Road 8 (x i) to submit to the Director the Baseline Monitoring Report and (-ii) to submit to the Director the month ) EMampA Reports for the CWB project

9 I I) D the Holder of Env ironmenta l Permit EP-3642009 is required under EP-3642009 or any subsequent EP amended by the Director under the Ordinance (i) to implement the proposed construction Orks of CWB including its Road Tunne l and Slip

Roads ventilation buildings and ent shaft(s) at the location sho n in Figure I of EP-36-l2009 together ith the relevant environmental mitigation measures and

(ii) to set up a dedicated eb site and notify the Director in writing the Internet address here the environmental monitoring and project data is to be placed

for the CWB project

I0 Any person vho constructs the Project contrar middot to the conditions in the Permit and is convicted of an offen ce under the Ordinance is liab le shy

( Environmemal Permit No FEP- 12364 12009D

fRmH uJJff~fifJfE FEP-123642009D

(i) on a first conviction on indictment to a fine of$ 2 million and to imprisonment for 6 months

(ii) on a second or subsequen t conviction on ind ictment to a fi ne of $ 5 mil lion and to imprisonment for years

(iii) on a first summary conviction to a fine at leve l 6 and to imprisonment for 6 months

(iv) on a second or subsequent summary conviction to a fi ne of$1 mi llion and to imprisonment for 1 year and

(v) in any case here the offence is of a contin uing nature the court or magistrate may impose a fine of$ 1 0000 fo r each day on v hich he is sat isfied the offence continued

1 I The Permit Holder may appea l aga inst any condit ion of this Permit under Section I 7 of the Ord inance i thi n 30 days of receipt of this Permit

12 The Note are for general reference only and that the Perm it Holder should refer to the EIA Ord inance for deta ils and seek independent legal advice

Environmental Permit No FEP- 12136412009D IlftilrMT-Zfc C~ I 6 I 0 I~JYliJT nJ ~v~IH ~JIIt FEP-12 3 4 2 09 D

- 11 shy

( Environmental Permit No FEP- 123642009 D

J~Jff~f oJdfr~f-6~ FEP- 1236-12009 bull0

Table la

[Not used]

Table l b Exha ust Related Design Criteria of the Ccnt1middotal Ventilation Building and t he East Ventilation Building and its Vent Shaft (based on Table 311 of the WDIIampCWB EIA Report (Registe1middot No AElAR-1252008)

Minimum mid-dischabullmiddotge Cross-sectional Exit velocity Exhaust

height (meter above (m s1

)area of stack (m2) direction

ground)

Vertica l Central Venti lation 219 8 175

Bu ildi ng (CVB)

Incl ined 45 Vent shaft of the

degree up ard East Venti lation

94 8 1625 (discharge Bui lding

tO~ ards sea (EVB)

direction)

Notes This Table shall be read in conjunction ith Condition 213 and Figure I of this Perm it The vent shaft of CVB i11 be incorporated ~ ith in the CVB

The vent shaft of EVB il l be separated from the EVB and located at the eastern break at er of the Cause~ ay Bay T) phoon Shelter

- 12shy

--shy N

COVERED BY APPROVED CWB amp IECL EIA REPIJH E IAO REGISTER NO AEIAR - ~12001 I

[

CENTRAL RECL PHASE ~-

~ 11 middott l l J

-shy -~ __r _______ __--shy- I

I

reg +

I fmiddotll

71 lt1

I

~ I

111~Srt ~ ~

Proj ect Title Wan C hai Development Phase 11 - Central-Wan C hai 13y1Jass at W~n C hai West (Contract No 11 K20 1208)- Tunnel Works

I~lfg glf ffr~famp~ -W-J- cfJtl~tT-~lli - ~ffflpoundi~ji (fltlt~J~ 11 K20 1208) ~ill I fpound

Environmental Permil No FEP 123642009D

[ ~

Figure la Location of the Project [sect la Ifi~Fifrr~

Bnuudu ofStmh 1r~a tl i 1J Itiioii~l

F cll l lf Rcclamatt OII hpound JnIIJJ

Tnm~ Rood 111 lunncl ]~yJ

t lti oadc Inn1~ Rltbullad amp iltp Road 1111111 bull bull wgtbull tl~~middot

~hp RuaJ on I leatccl 1ruuurc 1r~middot1Yn

t Iht li lUIC 11 plqlUCcl ha--rd (111 II~UI( 1 ell Jl plit Jfl(lll hlf h ulhcr l m trnnmcn1c11Pel ml c pp lliIIU)Il ~(l 11 ~- 1 71201h))

( f[~flJtf it~bullt fJi(Jl tq bull)1 ( ftt middot l-J 11 1-17 I02U ih) Jf la 11middot~ )EI51mtrrcrm~~~ FpoundP- 12J64t2oo9 o

shy

shy

1

Legend lffiiIJ

1 middot~ SI n BOUNDARY i-

VICTO~lt IIARIICUR

GDIJ1 OJlCl100 COl GC0412~7Cl1001C02

Project Tit le Wan C lwi Development Phase 11- Central-Wan Chai Bypass at Wan C hai West Figubullmiddote 1 b General Layout of the Pbullmiddotojcct (Contract No HY201208)- T unnel Worllts 1MJ 1 b I~~g 111iJFiJ~I~Jfisect~flJ ~fr~fm~=Wi - cppound95air~ili - ~ffgsectt~ (~~g~ljf HK20 1208)shy~iliifM

1Tillbull filHC tl~ prepared h I H-171 110161)1C(f ltm lrBurc IIK1l Appluauon h1r lunher Fmmlnmelllal l~rmu ( pphcat rcm rn Environmental Permit No FEP- 1 236~20090 t11 bullfll~ ppld(Jllcl middotJ~J I 1bullbull1 1 W n I-1 12CI16)il h illt~l l$1-IJlffPJID~liR FEP- 123642009D

Page 2: :Jn - EPD · 2016. 12. 14. · referenced ( 19) in Ax(-1) to EP2/H4 'C/09 11. 7. Environmental Permit Issued - Permit No.: EP-356/2009 issued to Civil Engineering and Development

c bcc wencl S[RS]4

c Environmental Permit No

ffJ ~~r oJillf~511t FEP-1236-+12009D FEP-1 23642009D

ENVIRONMENTAL IMPACT ASSESSMENT ORDINANCE (CHAPTER 499) Sections I 0 amp 12

~m~~gsjf~f~f9l (~499~)

~ 1 0amp12~

FURTHER ENVIRONMENTAL PERMIT TO CONSTRUCT A DESIGNATED PROJECT

PART A (MAIN PERMIT) At5j3 (WfOJ~plusmn~t5J35)

Pursuant to Sections I0 and 12 of the Environmental Impact Assessment Ordinance (El AO) the Director of Environmental Protection (the Director) grants this fUJiher environmental permit to China Stale - Build King Joint Venture (Chine State Construction Engineering (Hong Kong) Limited and Build King Civi l Engineering Limited as partners) (hereinaft er referred to as the Permit Holder) to construct the designated proj ect described in Patt B subject to the conditions specified in Part C The issue of this further environmemal permit is based on the documents approvals or permissions described below

tr~ ~ fRJl middotf~ ~J1 f1i (tf JI] (f~~FMRf91J )~ IO(IFamp 12fJW~mA middot ~JQ fyen~fjW~ lt Wffi )Jlfr 1~JrA~~tftriF or mm T 1 1 ~7~ - fiJ 2ifil[ti~ c iJ ~~~ ~r~I ti c fl~H-rFgtti z~ riJraquo f l~J ctpound~ r~~nJt ~s f-A) c f fill g~ ufrrf t4 1J A ) middot t)~iZi B h9lrJT f~U~Hl~i~ )1J~irfl F1 middot fJm~ ltT~J5JT i1JfY Jf~fiJfdt 1qfr f1~f~ JJI ilf o1 iiTf rf fldl~ 1middot 91 X ft- ttUF dU1FUJ rm ~ ~If

Application No LjJ ~ t~~~-m

FEP- 17120 16

~

Document in the Register t~~ITI A~Xft

I Ce ntral - Wan Chai Bypass and Island Eastern Corridor Link (Register No AEIAR-0-+ 12001 )

- Environmental Impact Assessment Report (July 200 I) rHereinafl er referred to as the CW BampI EC L EIA Repo rt)

- Environmental Monitoring and Audit Manual - Executive Summar)

2 The Directors letter of approval of the CWBamp IECL El A Report dated 3 I August 200 I referenced ( 19) in Ax(2) to EP2H4 A I 0 11

3

4

5

Wan Chai Development Phase 11 and Central-Wan Chai Bypass (Register No AEIAR-1 252008)

- Environmental Impact Assessment Report (December 2007) [Hereinafter referred to as the WDIIampCWB El A Report]

- Environmental Monitoring and Audit Manual - Executive Summaty - Further information received fimiddotom the Civi l Engineering and Development

Depattment on I I March 2008 9 April 2008 and 14 November 2008 under Section 8( I) of the Environmental Impact Assessment Ordinance

The Directors letter of approval of the WDIJampCWB EIA Repon dated I I December 2008 referenced (85) in EP2H4S3 15 Pt2

Central Reclamation Phase I I I - Studies Site Investigation Des ign and Constru ction (Register No AEIAR-040200 I) ~

- Environmental Impact Assessment Report (July 200 I) 6~

- I shy

( Environmental Permit No FEP- 123642009D

fiV5Ufofill~liHft FEP-123642009D

[Hereinafter referred to as the CRI II EIA Report] - Environmental Monitoring and Audit Manual - Executive Summary

6 The Director s letter of approval of the CRI II El A Report dated 31 August 200 I referenced ( 19) in Ax(-1) to EP2H4 C09 11

7 Environmenta l Permit Issued - Permit No EP-3562009 issued to Civil Engineering and Development Department on 30 July 2009 for construction of the following designated projects (i) Permanent and temporary reclamation works including associated dredging

Orks in Wan Chai Development Phase 11 (WDI I) area (referred to as DP3 in the WDIIampCWB EIA Report)

(i i) Wan Chai East Sewage Outfall (referred to as DP5 in the WDIIampCWB EIA Report) and

(iii) Dredging for the Cross-harbour Water Mains from Wan Chai to Tsim Sha Tsui (referred to as DP6 in the WDI IampCWB EIA Report)

8 Application for Environmental Permit and attachments submitted by the Permit Holder on 27 July 2009 (Appl ication No AEP-36412009)

9 Environmental Permit (No EP-3642009) issued on 17 August 2009

10 Application documents for Variation of Environmental Permit including all attachments submitted by the Permit Holder on 28 July 20 I 0 (Application No VEP-321 20 I 0)

11 Environmental Permit issued - Permit No EP-3642009A issued on 4 August 201 0

12 Application documents for Variation of Environmental Permit including all attachments submitted by the Permit Holder on 3 1 August 20 12 (Application No VEP-374 20 12)

13 Environmental Permit issued - Permit No EP-36412009B issued on 20 September 20 12

14 Appl ication for Further Environmental Permit including all attachments submitted on 8 Februaty 20 13 (Appl icat ion No FEP- 14420 13)

15 Appl icat ion documents for Variation of Environmental Permit including all anachments submitted by the Permit Holder on 20 June 20 14 (Appl ication No VEP-44320 14)

16 Environmental Permit issued- Permit No EP-3642009C issued on 11 July 20 14

17 Appl ication documents for Variation of Environmental Permit including all attachments submitted by the Pennit Holder on 28 October 2015 (Appl ication No VEP-485120 15)

18 Environmental Perm it issued - Perm it No EP-3642009 D issued on 24 November 2015

19 Application for Further Environmental Permit including al l attachments submitted on 26 Ju ly 20 16 (Application No FEP-171 20 16)

I

- 2 -

c Environmental Permit No FEP-12136412009D

~ii~F uJ~mQfj( FEP-123642009 D

A EIAR-0~ 1200 I) - f~Jftl~~~f~~fi- (20011f7 F ) [ f ffli 1 CW Bamp I ECUf ril in ) - f~lft~~~t~ f-IRt - fl jfj 11Kl ~

~-ampti~2ool lf-8 ~ 31 H ~tHmiddotKWBampI Ec u~ ~-r yenHi 8Hlt1Hg f17 mt~ ~ ( 19) in Ax(2) to EP2l-14A 10 11

13 WHtlt~~I-Jil]~~lYlamp Jif1~middot~f~~ili (ft ~c lift ~_w ~di A EIAR-1252008) bull f~Jftl~~~middotjif~~yenfHlf (20071j- 12 =j )[ Ffilj r WDIIampCWBf~riHifi- ) bull J~fl~~15~ fllfr bull f fjfjjJij~ bull J lJf~HitHHl~P~fliifsectIJ~8 (1) (~fiU~2008 1f3 F3 11 H middot 2008lj4J=l9H amp

2008f-11 F 14 Hf1Tf)pound~~fJ~-717-Qf4

4 f-amp~~2008 11 12F3 11 H1tHmiddotHttU~ WDIIampCWB fg riJ1yen fi- A~ (Fi it-middot M~~ ~fE (85) in EP2tll4 S3115 Pt 2

5 l] 1 ItltF jmiddoti1J~ II 1 )YJ - ~111t middot ttrliJfWJ middot ~l~ImiddotW~~Nli~clliPH~fft AEIAR-0~0100 I) bull fgtffh~~~jUI~Hlf (200 11 P J=l )[ 1- jTJ 1 C RIll pound~ H-ti fi- ] bull fnmYili~Wft r-~nt bull fjjfjJJ)j~

6 f-ampti~200I 1-8F3 31 H ~ttf1 CR III~ r ii n- fl~ Jttfldf middot ~~~ pound ~-IBt lt19) in Ax(4) to EP2H4Ci09 11

7 ~lf~tfi~J~mrif uJ(Z- rif uf~(t~mffiEP-35612009 li20091p )=l30 F-1 f~middotf~J _Ljtffit~~lAilHilH HfitifilrQtJ (i) pound~i 6tk~~ jmiddotDIJB~l~JHJ k 11]i~fhyenttfij_[f~( t~HkflllfMQLl_L~)

( W D 11 amp C W B Jg ~I 1 n IJ fiTJ -- D P 3--) (ii) ~1 ( bullJ]Ij(t)l 1j(U( W D 11 ampC W B f~ rimiddotJ $U fT IAJ fjTJ middotmiddot D P 5 ) amp (iii) rf( yen tIUi~JI(Jij frrAJtQJtif~( W D 11 ampC W Big nhit fir IAJ fii

--DP6)

8 rifcJiH41T AE2009 1p )1 27 Ht~XH~r~mrifufjQLjJ~i1)ftJlfftft-U-Jlri81r ~il ~flf AEP-36~2009)

I 0 riF ufJ~H-11 Afi~20 I Ofj= 7F 28 Ht~ X A~ Jiamp~J-Qrir uf6LJrriiLZffl11~1Wiffft (j(Ljrrifillj~mm YEP-32 120 I 0)

12 jf cfrimiddot1t-1TAU~20 12J~ 8F3 31 H 1poundi~l~ rlif(f~Vffrif uf~tLjr ~i1XItlMr1T11flt ft(Ljr~j1g~~Wi YEP-37~2012)

14 j~ 2013 11- 2 I=J 8 Htpound~flmiddot~~frfi~JfRflKruftfLjr~jjXf~8frifiiT11fitfflt4J ~ri 1 f ~~lit FEP-1442013)

( Environmental Permit No FEP-1 2 3642009 D

I~ijlJfuH(g~~ft FEP-12 364 2009 D

f~(EP~ifilf~~~it VEP-44312014)

16 ~ri~~w~~JJlifuf~middot1 - ~foJ~tl~~5i1( EP -3642009C fi 2014lf7 J=l ll R ~ ~1

17 gfoJllit-trAX 20 15 f 10 E3 28 Ht~XA~JL1~~1ft~fofi(fLJ-l~fLzft-ilfrlirfT~ ~fi ff(LJ-lcii11 1 ~~~~t YEP-48520 15)

18 C~i~~R~l~JfioJillt - ~FoJ~tl~hl~ft EP-3642009D j~ 20151 ~ 11 Fl24 Hi ~

19 n~ 20 16 1f 7 J=l 26 H tE~R~trJrAJf~ricif oJ(14JJi Xft-fjfJjrtrtr~f11t-lt lfJ~j ~ ~W~ft FEP-171 20 16)

August 20 16 2016 f 8 Mt 13

Date ( en YK o g) Principal Environmental Protecti Officer HWJ for Director of Environmental Protection

r~~fw-fit1~~wamp ltHJmf~lftf~iiliplusmnff O(WiVc (-(f)

- 4shy

( Environmental Permit No FEP-1 23642009D

J~iflR1 oJ]litf~l]rff FEP-12364i200910

PART B (DESCRIPTION OF DESIGNATED PROJECT) B$ (sect~I~~ 13 89~~)

Hereunder is the description of the designated project mentioned in Part A of this environmental pennit (hereinafter referred to as the Perm it ) fYIJM4~mliJ1 uJaf( Hi4~f unampmiddotmiddot)A ~IfiTJJpoundQilfijtl1JEIfj_J~i rl l~~5ii9J

Title of Designated Proj ect Wan Chai Development Phase 11- Central - Wan Chai Bypass at Wan Chai West m~_[tP~HB~ ~ lli (Contract No HK20 1208)- Tunnel Works

-as part of the middotmiddotc entral-Wan Chai Bypass including its Road Tunnel and Slip Roads (the CWB project) which is covered in the Environmental Permit No EP-3642009 B (This designmed proj ect is hereinafter referred to as middotthe Project)

~1 HU~~LWJ shy I 1 1~~1H~~jfj - i~ i ff19H ((~~~~~lid~ilt H K20 1208) shy l~lli _[fpound

- IltItpound~ ijJ~lH f~Ut(~jiJtf jmiddot fj[ j~jlliJid2lH~lM (C wBIf2Xi F=l )RJ- yensect1 fB middot -J ~~~tfl~f1ilijrofcttl - ~middotroJift~~~m EP-3642009B A~jIJ

c -4-1f1iLt~rw n F1fJLfpoundrq t=n

Nature of Designated Project 1lli_[flfrCi HRj lmiddot1Jl

The Project is a part of the Central-Wan Chai Bypass project (The CWB project will involve construction of a trunk road and its road tunnel more than 800m length between portals)

JltIf~Jfi HJJ 1 l 1 f~i1f S~Ht1I]Erri HA~ - iil~M (C wBJJpoundIC1 HJvfl~~l1- fiU ~1~lliJ_JAu~IL~RmiddotJft~MliM800I~A~f r middotrj[~jill )

Location of Designated Project Wan Chai West harbour-front area Hong Kong 1ilJtJJPtl H A~tttl~ The location ofthe Project is shovn in Fi gures la and lb of this Permit

-~~]~( (pgPj )

_[tJLJ(j HA~tttrlill~ f~fj~ 4~f oft] IN] Iaamp_IN] I b[AJ

Scale and Scope of Designated Project fi=iitLt~PCi 1-J A~tflttHJJitlli[l

The scope of the Project mainly includes bull construction ofa du al three-lane trunk road tunnel of approx imate) 3 1 Om in

length (including the substructure of Middle Ventilation Building) and two slip roads

(part of the CWB project )

Remark s

bull The permanent and temporary reclamation and associated dredging orks re lated to the CWB construction are separately covered by the environmental perm it No EP-35612009 issued to the Civil Engineering and Development Department (CEDD)

I j=~rfi jj A~iuiltj plusmn~hltk bull ~~fll-(lt~J 3 I oj~FI~-=~~ E_(rJ ( f rjj~flli li1~ 1 I )4illiR~ktlJlfigJt11Fi) U

Bt~~~~

(CWB_LtJIJDHH~ - 15f M )

iW1l ijm~i Jfkilifl1tDfltl~ ~k ~o~~MBrttfiJI fECf2lJr5tfi~tr~JtL1poundgt J- _L lhlHi ll~llR-J~lfitif oJmUiFoHtW~lJ11[ EP-3562009)

- 5 shy

( Environmental Permit No FEP-1213642009D

f~fflWF ufafi~~~ilt FEP-1 236412009D

PART C (PERMJT CONDITIONS)

1 General Conditions

11 The Permit Holder and any person Ori--ing on the Project shall comply with a ll condit ions set out in thi s Permit Any non-compliance b) any person may constitute a contravention of the Environmenta l Impact Assessment Ordinance (E IAO) (Cap499) and may become the subject of appropriate action being taken under the Ordinance

12 The Permit Holder shall ensure fu ll compliance with al l legis lation from time to time in force including ithout limi tation to the Ai r Pollution Control Ord inance (Cap 3 11 ) Water Pollution Contro l Ordi nance (Cap 358) Noise Control Ordinance (Cap 400) and Waste Disposa l Ord inance (Cap 3 54) This Perm it does not of itself constitute any ground of defense aga inst any proceed ings instituted under any legislation or imp ly any approva l under an) legislation

13 The Permit Holder shall make copies of this Permit together with a ll documents referred to in this Permit and the documents referred to in Part A of this Permit read ily available at all times for inspect ion by the Di rector or his authori zed officers at all sitesoffice covered by th is Perm it Any reference to the Permit shall incl ude a ll documents referred to in the Permit and also the relevant documents in the Register

I4 The Permit Holder shall give a copy of this Permit to the person(s) in charge of the site(s) and ensure that such person(s) ful ly understa nds all cond it ions and all req uirements incorporated by the Permit The site(s) refers to site(s) of construction of the Project and shall mean the same hereafter

15 The Permit Holder shall d isplay conspicuously a copy of this Permit on the construct ion site(s) at a I I eh icular site entrancesex its or at a convenient location for pub I ic middot s information at a 11 times The Permit Holder shall ensure that the most updated in formation about the Permi t including any amended Permit is di sp layed at such locat ions If the Permit Holder surrenders a part or the whole of this Permit the notice he sends to the Director shall also be displayed at the same locations as the original Permit The suspended varied or cance ll ed Permit shall be removed from disp lay at the construction site(s)

16 The Permit Holder shal l construct the Project in accordance with the project description in Part B of this Perm it (hereafter referred to as the Project)

17 The Permit Holder shal l ensu re that the Project is designed and constructed in accordance ith the middot relevant information and recommenda tions described in the approved CWBampIECL EIA Report (Register No AEIAR-04 1 200 I) the approved WDIIampCWB El A Report (Register No AEIA R- 1252008) the approved CRIII El A Report (Register No AEIAR-040200 I) the app lication documents for environmenta l perm it other relevant documents in the Regi ster and the information or mitigation measures described in this Permit and mitigation measu res to be recommended in submissions that shal l be deposited vi th or approved by the Director as a result of perm it condit ions contained in this Permit and mitigation measures to be recommend ed under on-going surveillance and monitorin g activit ies during a ll stages of the Project Where recommendations referred to in the documents of the Register are not expressly referred to in thi s Permit such recommendations are nevertheless to be implemented unless express) exc luded or impliedly amended in thi s Permit The Project is part of the CWB project

18 Al l deposited subm issions as required under thi s Permit shall be rect ified and

- 6shy

( Environmental Permit No FEP-12364 1200910

f~~~F uJm~5J1t FEP- 12364200910

accordance ith the comments if any made by the Director within one month of the receipt of the Director s comments or otherwise specified by the Director

19 All submiss ions approved by the Director all submissions deposited withou t comments by the Director or al l su bmissions rectified in accordance ith comments by the Director under this Permit shall be construed as part of the permit cond itions described in Pan C of th is Permit Any variation of the submissions shall be approved by the Director in writ ing or as prescribed in the relevant permit cond itions Any non-compliance ith the submissions may constitute a contra ention of the Em ironmental Impact Assessment Ordinance (Cap499) All submissions or any variation of the submiss ions shall be certified by the Environmenta l Team (ET) Leader and verified by the Independen t Environmental Checker (IEC) employed for the CWB project before submitting to the Director under this permit (see note 7)

110 The Perm it Holder shall release all final ized submissions as required under this Permit to the publ ic by depositing copies in the Environmenta l Impact Assessment Ordinance Register Offi ce or in any other places or any internet websites as specified by the Director or by any oth er means as specified by the Director for publi c inspection For this purpose the Permit Holder sha ll provide sufficient copies of the submiss ions

111 All submissions to the Director required under this Permit shall be delivered either in person or by registered ma il to the Environmenta l Im pact Assessment Ord inance Register Office (cu rrently at 27 F Southern Cen tre 130 Hennessy Road Wanchai Hong Kong) Electronic copie of al l fina lized submiss ions required under this Permit shall be prepared in H) per Text Markup Language (HTML) (version 40 or later) and in Portable Document Formflt (PDF version 40 or later) unless othem ise agreed by the Director and slull l be submitted at the same time as the hard copies

2 Special Conditions

2 1-22 fNot Used]

Environmenta l Project Committee (ENPC)

23 To Oe rsee and fac ilitate effecti ve contro l of the cumul ative environmental im pacts arising from potential multiple contracts for the construction of the en ti re Wan Chai Development Phase 11 (WDII ) and Central-Wan Chai Bypass (CWB) (hereafter referred to as the who le Project) the Permit Holder shall take part as a member of Envi ronmental Project Committee (EN PC) set up for the hole proj ect (see note 8)

The ENPC shall make recommendation to enhance the monitoring and aud it of the em iron mental performance of the whole project and other relevflnt nea rby projects on top of requi rements as set out in Conditions 31 to 42 of this Permit or corresponding set out under subsequent Environmental Permits issued for the hole project and other relevant nearby projects (see notes 7 and 8)

24 -28 [Not Used]

Measu1middotes to Mitigate Constn1ction Noise Impact

29

( Environmental Permit No FEP-12364 12009D

f~fflXr wJ ~ft~~~m FEP-1213642009 0

two weeks prior to the commencement of construction of the corresponding component(s) of the Proj ect four hard copies and one electroni c copy of the construction noise management pl an consisting of la) out plan(s) in the scale of I 1000 or other appropriate scal e and explanatory statement(s) showing the noise mitigat ion measures to include the use of movabletemporary noise barriers the use of quiet po~ered mechanical equipments and the adopt ion of multiple-phase construction schedules where appropriate The submission(s) shall be ceriified by the ET Leader and verified by the I EC as conforming to the relevant inform ation and recommendations contained in the apprO ed CWBamplECL El A Report (Register No AEIAR-OJI 200 I) and the WDII ampCWB EIA Report (Register No AEIAR-1252008) before deposit ~ith the Di rector All measures recommended in the fi nalised submission(s) under th is Condition shall be full y and proper) implemented Measures co ered by other pollution control Ord inances hall not be included in this construction noise management plan (see note 8)

2 I 0 -2 13 [Not Used]

Measures to Mitigate Landscape and Visual Impact

214 To reduce the landsca pe and visua l impact during construction stage of the Project the Permit Holder shall implement a series of landscape and isualm itigati on measures The Permit Holder shall at least one month before the commencement of corresponding parts of landscape works of th e Project deposit with the Director four hard cop ies and one electronic copy of landscape plan(s) The landscape plan(s) sha ll show th e design detail s locations implementation programme maintenance and management schedules and drm ings in the sca le of 1 I 000 or other appropriate sca le of the landscape and visual mit igation measures of th e Project Before submission to the Director the landscape plan(s) shall be cer1ified by the ET Leader and verified by the I EC as conforming to the relevant in formation and recommendat ions contained in the apprOed CWBampIECL EIA Report (Regi ter No AEIAR-0412001) and the WDII ampCWB ElA Report (Register No A El A R-1252008) A 11 measures recommended in the fin a I ised su b m ission(s) under th is Condition shall be fu lly and properly implemented (see note 8)

3 Environmental Monitoring and Audit Requirements

31 The EMampA programme shall be implemented in accordance ith the procedures and requirements as set out in the updated EMampA Manual approved for the CWB project (See note 8) An) major changes to the programme shall be justified by the ET Leader and verifi ed by the IEC employed for the CWB project (see note 7) as conforming to the information and requirements contained in the updated EMampA Manua l

32 Samples measurements and necessary remed ial actions shall be taken in accordance with the requirements of the updated EMampA Manual for the CWB project (note 8) by (a) conducting baseline env ironmental monitoring (b) conducting impact monitoring (c) carrying out remedia l actions described in EventAction Plans of the updated EMampA

Manual in accordance with the time frames set out in EventAction Plans or as agreed by the Director in case here specified criteria in the updated EMampA Man ual approved are exceeded and

(d) logging and keeping records of deta ils of (a) to (c) above for a ll parameters within 3 working days of co llection of data or completi on of remedial action(s) for the purpose of preparing and submitting the monthly EMampA Reports and to make avai lab le for inspection

- 8 shy

c Environmental Permit No FEP-12364 middot2009tD

f~JR~fufiiftf~t FEP-1 2 36-+120090

33 [Not Used]

34 Four hard copies and one electronic copy of monthly EMampA Report shall be submitted to the Director Vithin I 0 working days after th e end of each reporting month The EMampA Report s shall inc lude a summary of all non-compl iance (exceedances) of th e envi ronmental quality performance limits (Action and Limit Levels) In compiling this monthly EMampA Report all relevant cumulative const ruction impacts due to concurrent activi ties of the concurrent projects includ ing the Cen tral Reclamation Phase Ill and the Wan Chai Demiddotelopment Phase 11 projects shall be addressed The submiss ions shal l be verified by the IEC emplo)ed for the CWB project (see note 8) Addit ional copies of the submiss ion sha ll be prO ided to the Director upon request by the Director

35 Al l env ironmental monitoring and audit data submitted under this Perm it shal l be true alid and correct

4 Elecflmiddotonic Reporting of EMampA Information

f I To facil itate public inspection of th e Baseline Monitoring Report and regu lar EMampA Reports ia the EIAO Internet Webs ite and at the EJAO Register OITice electronic copies of these Reports shall be prepared in Hyper Text Markup Language (HTML) (version 40 or later) and in Portable Document Format (PDF version -LO or later) unless otherwise agreed by the Director and shall be submitted at the same time as the hardcop ies a described in Condition 34 of th is Permit For the I-ITML version a content page capable of providing h) per ink to each section and sub-section of these Reports shall be included in the beginning of the document H) per inks to all figures drawings and tab les in these Reports shall be provided in the main text from here the respective references are made All graphics in these Reports shall be in interl aced GIF format unless otherwise agreed by the Director The content of the electronic copies of these Reports must be the same as the hardcopies

42 All ellmiddotironmentalmonitori ng data desc ribed in Condition 41 above shall be made a ailablc to the public ia a dedicated eb site to be set up for the CWB project (see note 9) in the shortest practicable time and in no event later than two vveeks after the relevant ell ironmentalmonitoring data are co llected or become ava il able unless othen ise agreed with th e Director

Notes

I This Permit consists of three parts namely PART A (Main Permit) PART B (Descript ion of Designated Project) and PART C (Perm it Conditions) Any person relying on th is perm it should obtain independent legal advice on the lega l implicat ions under the Ordinance and the fo llowing notes are for genera l info rmation only

2 If there is a breach of any conditions of this Permit the Director or his authorized officer ma) ~ ith the consent of the Secretar for the Environment order the cessat ion of associated work unti I the remedia l action is taken in respect of the resultant em ironmental damage and in that case the Permit Holder shall not carry out any associated works without the permiss ion of the Director or his authorized offi cer

3 The Permit Holder ma) apply under Sect ion 13 of th e Ordinance to the Director for a variation of the conditions of this Permit The Permit Holder shall replace the original permit di splayed on the construction site b) the amended perm it

4 A person who assumes the responsibility for the vvhole or a part of the designated project(s) may

- 9shy

c Environmental Permit No FEP- I 2 3642009 D

fftffl~jur-q~~~middot1pound FEP-12364 2009 0

before he assumes responsibilit) of the designated project(s) appl) under Section 12 of the Ordinance to the Di rector for a further ell ironmental permit

5 Under Section 14 of the Ordinance the Director ma~ ith the consent of the ecretary for the Environment suspend var or cancel this Permit The suspended varied or cancelled Permit shall be removed from displa) at the construction site

6 If this Permit is cancelled or surrendered during construction of th e Project another em ironmental permit must be obtained under the Ordinance before the Project could be continued lt is an offence under secti on 26( I) of the Ordinance to construct or operate a designated project li sted in Part I of schedule 2 of the Ordinance v ithout a va lid environmental permit

7 Higlm ays Department (H) D) the Holder of Env ironmental Permit (EP) No EP-3642009 is requ ired under EP-3642009 or any subsequent EP amended b) the Director under the Ord inance (i) to establish an Em ironmental Team (ET)~ hich shall be headed b) an ET Leader (ii) to emplo) an Independent Em ironmental Checker (IEC) (i ii) to liaise ith the Holder of Em ironmcntal Permit No EP-3562009 on to jointly set up an

Environmental Project Committee (EN PC)~ and (i) to liai se with the Holder of Em ironmental Permit No EP-3562009 to jointly set up a

Communit) Liaison Group (CLG) for the CWB project

8 H) D the Holder of EP-3642009 is required under EP-3642009 or any subsequent EP amend ed by the Director under the Ordinance (i) to notify the Director in Hiting the commencement date ofconstruction of the CWB project (i i) to notify the Director the date of sett ing up the EN PC (iii) to notif) the Director the date of setting up the CLG (iv) to submit to the Director for approva l the updated Environmental Monitoring and Audit

Manual (updated EMampA Manual) () to inform the Director in riling the management organ ization of the mai n construction

companies andor any form of joint entures associated i th the construction of the CWB project

( i) to deposit ith the Director a deta iled works schedu le and locat ion plans ( ii) to deposit v ith the Director a construction noise management plan ( iii) to deposit~ ith the Director an operationa l air qual it management plan (ix) to deposit middot ith the Director landscape plan(s) (x) to depos it ~ ith the Director an addit ional mitigation plan for Slip Road 8 (x i) to submit to the Director the Baseline Monitoring Report and (-ii) to submit to the Director the month ) EMampA Reports for the CWB project

9 I I) D the Holder of Env ironmenta l Permit EP-3642009 is required under EP-3642009 or any subsequent EP amended by the Director under the Ordinance (i) to implement the proposed construction Orks of CWB including its Road Tunne l and Slip

Roads ventilation buildings and ent shaft(s) at the location sho n in Figure I of EP-36-l2009 together ith the relevant environmental mitigation measures and

(ii) to set up a dedicated eb site and notify the Director in writing the Internet address here the environmental monitoring and project data is to be placed

for the CWB project

I0 Any person vho constructs the Project contrar middot to the conditions in the Permit and is convicted of an offen ce under the Ordinance is liab le shy

( Environmemal Permit No FEP- 12364 12009D

fRmH uJJff~fifJfE FEP-123642009D

(i) on a first conviction on indictment to a fine of$ 2 million and to imprisonment for 6 months

(ii) on a second or subsequen t conviction on ind ictment to a fi ne of $ 5 mil lion and to imprisonment for years

(iii) on a first summary conviction to a fine at leve l 6 and to imprisonment for 6 months

(iv) on a second or subsequent summary conviction to a fi ne of$1 mi llion and to imprisonment for 1 year and

(v) in any case here the offence is of a contin uing nature the court or magistrate may impose a fine of$ 1 0000 fo r each day on v hich he is sat isfied the offence continued

1 I The Permit Holder may appea l aga inst any condit ion of this Permit under Section I 7 of the Ord inance i thi n 30 days of receipt of this Permit

12 The Note are for general reference only and that the Perm it Holder should refer to the EIA Ord inance for deta ils and seek independent legal advice

Environmental Permit No FEP- 12136412009D IlftilrMT-Zfc C~ I 6 I 0 I~JYliJT nJ ~v~IH ~JIIt FEP-12 3 4 2 09 D

- 11 shy

( Environmental Permit No FEP- 123642009 D

J~Jff~f oJdfr~f-6~ FEP- 1236-12009 bull0

Table la

[Not used]

Table l b Exha ust Related Design Criteria of the Ccnt1middotal Ventilation Building and t he East Ventilation Building and its Vent Shaft (based on Table 311 of the WDIIampCWB EIA Report (Registe1middot No AElAR-1252008)

Minimum mid-dischabullmiddotge Cross-sectional Exit velocity Exhaust

height (meter above (m s1

)area of stack (m2) direction

ground)

Vertica l Central Venti lation 219 8 175

Bu ildi ng (CVB)

Incl ined 45 Vent shaft of the

degree up ard East Venti lation

94 8 1625 (discharge Bui lding

tO~ ards sea (EVB)

direction)

Notes This Table shall be read in conjunction ith Condition 213 and Figure I of this Perm it The vent shaft of CVB i11 be incorporated ~ ith in the CVB

The vent shaft of EVB il l be separated from the EVB and located at the eastern break at er of the Cause~ ay Bay T) phoon Shelter

- 12shy

--shy N

COVERED BY APPROVED CWB amp IECL EIA REPIJH E IAO REGISTER NO AEIAR - ~12001 I

[

CENTRAL RECL PHASE ~-

~ 11 middott l l J

-shy -~ __r _______ __--shy- I

I

reg +

I fmiddotll

71 lt1

I

~ I

111~Srt ~ ~

Proj ect Title Wan C hai Development Phase 11 - Central-Wan C hai 13y1Jass at W~n C hai West (Contract No 11 K20 1208)- Tunnel Works

I~lfg glf ffr~famp~ -W-J- cfJtl~tT-~lli - ~ffflpoundi~ji (fltlt~J~ 11 K20 1208) ~ill I fpound

Environmental Permil No FEP 123642009D

[ ~

Figure la Location of the Project [sect la Ifi~Fifrr~

Bnuudu ofStmh 1r~a tl i 1J Itiioii~l

F cll l lf Rcclamatt OII hpound JnIIJJ

Tnm~ Rood 111 lunncl ]~yJ

t lti oadc Inn1~ Rltbullad amp iltp Road 1111111 bull bull wgtbull tl~~middot

~hp RuaJ on I leatccl 1ruuurc 1r~middot1Yn

t Iht li lUIC 11 plqlUCcl ha--rd (111 II~UI( 1 ell Jl plit Jfl(lll hlf h ulhcr l m trnnmcn1c11Pel ml c pp lliIIU)Il ~(l 11 ~- 1 71201h))

( f[~flJtf it~bullt fJi(Jl tq bull)1 ( ftt middot l-J 11 1-17 I02U ih) Jf la 11middot~ )EI51mtrrcrm~~~ FpoundP- 12J64t2oo9 o

shy

shy

1

Legend lffiiIJ

1 middot~ SI n BOUNDARY i-

VICTO~lt IIARIICUR

GDIJ1 OJlCl100 COl GC0412~7Cl1001C02

Project Tit le Wan C lwi Development Phase 11- Central-Wan Chai Bypass at Wan C hai West Figubullmiddote 1 b General Layout of the Pbullmiddotojcct (Contract No HY201208)- T unnel Worllts 1MJ 1 b I~~g 111iJFiJ~I~Jfisect~flJ ~fr~fm~=Wi - cppound95air~ili - ~ffgsectt~ (~~g~ljf HK20 1208)shy~iliifM

1Tillbull filHC tl~ prepared h I H-171 110161)1C(f ltm lrBurc IIK1l Appluauon h1r lunher Fmmlnmelllal l~rmu ( pphcat rcm rn Environmental Permit No FEP- 1 236~20090 t11 bullfll~ ppld(Jllcl middotJ~J I 1bullbull1 1 W n I-1 12CI16)il h illt~l l$1-IJlffPJID~liR FEP- 123642009D

Page 3: :Jn - EPD · 2016. 12. 14. · referenced ( 19) in Ax(-1) to EP2/H4 'C/09 11. 7. Environmental Permit Issued - Permit No.: EP-356/2009 issued to Civil Engineering and Development

c Environmental Permit No

ffJ ~~r oJillf~511t FEP-1236-+12009D FEP-1 23642009D

ENVIRONMENTAL IMPACT ASSESSMENT ORDINANCE (CHAPTER 499) Sections I 0 amp 12

~m~~gsjf~f~f9l (~499~)

~ 1 0amp12~

FURTHER ENVIRONMENTAL PERMIT TO CONSTRUCT A DESIGNATED PROJECT

PART A (MAIN PERMIT) At5j3 (WfOJ~plusmn~t5J35)

Pursuant to Sections I0 and 12 of the Environmental Impact Assessment Ordinance (El AO) the Director of Environmental Protection (the Director) grants this fUJiher environmental permit to China Stale - Build King Joint Venture (Chine State Construction Engineering (Hong Kong) Limited and Build King Civi l Engineering Limited as partners) (hereinaft er referred to as the Permit Holder) to construct the designated proj ect described in Patt B subject to the conditions specified in Part C The issue of this further environmemal permit is based on the documents approvals or permissions described below

tr~ ~ fRJl middotf~ ~J1 f1i (tf JI] (f~~FMRf91J )~ IO(IFamp 12fJW~mA middot ~JQ fyen~fjW~ lt Wffi )Jlfr 1~JrA~~tftriF or mm T 1 1 ~7~ - fiJ 2ifil[ti~ c iJ ~~~ ~r~I ti c fl~H-rFgtti z~ riJraquo f l~J ctpound~ r~~nJt ~s f-A) c f fill g~ ufrrf t4 1J A ) middot t)~iZi B h9lrJT f~U~Hl~i~ )1J~irfl F1 middot fJm~ ltT~J5JT i1JfY Jf~fiJfdt 1qfr f1~f~ JJI ilf o1 iiTf rf fldl~ 1middot 91 X ft- ttUF dU1FUJ rm ~ ~If

Application No LjJ ~ t~~~-m

FEP- 17120 16

~

Document in the Register t~~ITI A~Xft

I Ce ntral - Wan Chai Bypass and Island Eastern Corridor Link (Register No AEIAR-0-+ 12001 )

- Environmental Impact Assessment Report (July 200 I) rHereinafl er referred to as the CW BampI EC L EIA Repo rt)

- Environmental Monitoring and Audit Manual - Executive Summar)

2 The Directors letter of approval of the CWBamp IECL El A Report dated 3 I August 200 I referenced ( 19) in Ax(2) to EP2H4 A I 0 11

3

4

5

Wan Chai Development Phase 11 and Central-Wan Chai Bypass (Register No AEIAR-1 252008)

- Environmental Impact Assessment Report (December 2007) [Hereinafter referred to as the WDIIampCWB El A Report]

- Environmental Monitoring and Audit Manual - Executive Summaty - Further information received fimiddotom the Civi l Engineering and Development

Depattment on I I March 2008 9 April 2008 and 14 November 2008 under Section 8( I) of the Environmental Impact Assessment Ordinance

The Directors letter of approval of the WDIJampCWB EIA Repon dated I I December 2008 referenced (85) in EP2H4S3 15 Pt2

Central Reclamation Phase I I I - Studies Site Investigation Des ign and Constru ction (Register No AEIAR-040200 I) ~

- Environmental Impact Assessment Report (July 200 I) 6~

- I shy

( Environmental Permit No FEP- 123642009D

fiV5Ufofill~liHft FEP-123642009D

[Hereinafter referred to as the CRI II EIA Report] - Environmental Monitoring and Audit Manual - Executive Summary

6 The Director s letter of approval of the CRI II El A Report dated 31 August 200 I referenced ( 19) in Ax(-1) to EP2H4 C09 11

7 Environmenta l Permit Issued - Permit No EP-3562009 issued to Civil Engineering and Development Department on 30 July 2009 for construction of the following designated projects (i) Permanent and temporary reclamation works including associated dredging

Orks in Wan Chai Development Phase 11 (WDI I) area (referred to as DP3 in the WDIIampCWB EIA Report)

(i i) Wan Chai East Sewage Outfall (referred to as DP5 in the WDIIampCWB EIA Report) and

(iii) Dredging for the Cross-harbour Water Mains from Wan Chai to Tsim Sha Tsui (referred to as DP6 in the WDI IampCWB EIA Report)

8 Application for Environmental Permit and attachments submitted by the Permit Holder on 27 July 2009 (Appl ication No AEP-36412009)

9 Environmental Permit (No EP-3642009) issued on 17 August 2009

10 Application documents for Variation of Environmental Permit including all attachments submitted by the Permit Holder on 28 July 20 I 0 (Application No VEP-321 20 I 0)

11 Environmental Permit issued - Permit No EP-3642009A issued on 4 August 201 0

12 Application documents for Variation of Environmental Permit including all attachments submitted by the Permit Holder on 3 1 August 20 12 (Application No VEP-374 20 12)

13 Environmental Permit issued - Permit No EP-36412009B issued on 20 September 20 12

14 Appl ication for Further Environmental Permit including all attachments submitted on 8 Februaty 20 13 (Appl icat ion No FEP- 14420 13)

15 Appl icat ion documents for Variation of Environmental Permit including all anachments submitted by the Permit Holder on 20 June 20 14 (Appl ication No VEP-44320 14)

16 Environmental Permit issued- Permit No EP-3642009C issued on 11 July 20 14

17 Appl ication documents for Variation of Environmental Permit including all attachments submitted by the Pennit Holder on 28 October 2015 (Appl ication No VEP-485120 15)

18 Environmental Perm it issued - Perm it No EP-3642009 D issued on 24 November 2015

19 Application for Further Environmental Permit including al l attachments submitted on 26 Ju ly 20 16 (Application No FEP-171 20 16)

I

- 2 -

c Environmental Permit No FEP-12136412009D

~ii~F uJ~mQfj( FEP-123642009 D

A EIAR-0~ 1200 I) - f~Jftl~~~f~~fi- (20011f7 F ) [ f ffli 1 CW Bamp I ECUf ril in ) - f~lft~~~t~ f-IRt - fl jfj 11Kl ~

~-ampti~2ool lf-8 ~ 31 H ~tHmiddotKWBampI Ec u~ ~-r yenHi 8Hlt1Hg f17 mt~ ~ ( 19) in Ax(2) to EP2l-14A 10 11

13 WHtlt~~I-Jil]~~lYlamp Jif1~middot~f~~ili (ft ~c lift ~_w ~di A EIAR-1252008) bull f~Jftl~~~middotjif~~yenfHlf (20071j- 12 =j )[ Ffilj r WDIIampCWBf~riHifi- ) bull J~fl~~15~ fllfr bull f fjfjjJij~ bull J lJf~HitHHl~P~fliifsectIJ~8 (1) (~fiU~2008 1f3 F3 11 H middot 2008lj4J=l9H amp

2008f-11 F 14 Hf1Tf)pound~~fJ~-717-Qf4

4 f-amp~~2008 11 12F3 11 H1tHmiddotHttU~ WDIIampCWB fg riJ1yen fi- A~ (Fi it-middot M~~ ~fE (85) in EP2tll4 S3115 Pt 2

5 l] 1 ItltF jmiddoti1J~ II 1 )YJ - ~111t middot ttrliJfWJ middot ~l~ImiddotW~~Nli~clliPH~fft AEIAR-0~0100 I) bull fgtffh~~~jUI~Hlf (200 11 P J=l )[ 1- jTJ 1 C RIll pound~ H-ti fi- ] bull fnmYili~Wft r-~nt bull fjjfjJJ)j~

6 f-ampti~200I 1-8F3 31 H ~ttf1 CR III~ r ii n- fl~ Jttfldf middot ~~~ pound ~-IBt lt19) in Ax(4) to EP2H4Ci09 11

7 ~lf~tfi~J~mrif uJ(Z- rif uf~(t~mffiEP-35612009 li20091p )=l30 F-1 f~middotf~J _Ljtffit~~lAilHilH HfitifilrQtJ (i) pound~i 6tk~~ jmiddotDIJB~l~JHJ k 11]i~fhyenttfij_[f~( t~HkflllfMQLl_L~)

( W D 11 amp C W B Jg ~I 1 n IJ fiTJ -- D P 3--) (ii) ~1 ( bullJ]Ij(t)l 1j(U( W D 11 ampC W B f~ rimiddotJ $U fT IAJ fjTJ middotmiddot D P 5 ) amp (iii) rf( yen tIUi~JI(Jij frrAJtQJtif~( W D 11 ampC W Big nhit fir IAJ fii

--DP6)

8 rifcJiH41T AE2009 1p )1 27 Ht~XH~r~mrifufjQLjJ~i1)ftJlfftft-U-Jlri81r ~il ~flf AEP-36~2009)

I 0 riF ufJ~H-11 Afi~20 I Ofj= 7F 28 Ht~ X A~ Jiamp~J-Qrir uf6LJrriiLZffl11~1Wiffft (j(Ljrrifillj~mm YEP-32 120 I 0)

12 jf cfrimiddot1t-1TAU~20 12J~ 8F3 31 H 1poundi~l~ rlif(f~Vffrif uf~tLjr ~i1XItlMr1T11flt ft(Ljr~j1g~~Wi YEP-37~2012)

14 j~ 2013 11- 2 I=J 8 Htpound~flmiddot~~frfi~JfRflKruftfLjr~jjXf~8frifiiT11fitfflt4J ~ri 1 f ~~lit FEP-1442013)

( Environmental Permit No FEP-1 2 3642009 D

I~ijlJfuH(g~~ft FEP-12 364 2009 D

f~(EP~ifilf~~~it VEP-44312014)

16 ~ri~~w~~JJlifuf~middot1 - ~foJ~tl~~5i1( EP -3642009C fi 2014lf7 J=l ll R ~ ~1

17 gfoJllit-trAX 20 15 f 10 E3 28 Ht~XA~JL1~~1ft~fofi(fLJ-l~fLzft-ilfrlirfT~ ~fi ff(LJ-lcii11 1 ~~~~t YEP-48520 15)

18 C~i~~R~l~JfioJillt - ~FoJ~tl~hl~ft EP-3642009D j~ 20151 ~ 11 Fl24 Hi ~

19 n~ 20 16 1f 7 J=l 26 H tE~R~trJrAJf~ricif oJ(14JJi Xft-fjfJjrtrtr~f11t-lt lfJ~j ~ ~W~ft FEP-171 20 16)

August 20 16 2016 f 8 Mt 13

Date ( en YK o g) Principal Environmental Protecti Officer HWJ for Director of Environmental Protection

r~~fw-fit1~~wamp ltHJmf~lftf~iiliplusmnff O(WiVc (-(f)

- 4shy

( Environmental Permit No FEP-1 23642009D

J~iflR1 oJ]litf~l]rff FEP-12364i200910

PART B (DESCRIPTION OF DESIGNATED PROJECT) B$ (sect~I~~ 13 89~~)

Hereunder is the description of the designated project mentioned in Part A of this environmental pennit (hereinafter referred to as the Perm it ) fYIJM4~mliJ1 uJaf( Hi4~f unampmiddotmiddot)A ~IfiTJJpoundQilfijtl1JEIfj_J~i rl l~~5ii9J

Title of Designated Proj ect Wan Chai Development Phase 11- Central - Wan Chai Bypass at Wan Chai West m~_[tP~HB~ ~ lli (Contract No HK20 1208)- Tunnel Works

-as part of the middotmiddotc entral-Wan Chai Bypass including its Road Tunnel and Slip Roads (the CWB project) which is covered in the Environmental Permit No EP-3642009 B (This designmed proj ect is hereinafter referred to as middotthe Project)

~1 HU~~LWJ shy I 1 1~~1H~~jfj - i~ i ff19H ((~~~~~lid~ilt H K20 1208) shy l~lli _[fpound

- IltItpound~ ijJ~lH f~Ut(~jiJtf jmiddot fj[ j~jlliJid2lH~lM (C wBIf2Xi F=l )RJ- yensect1 fB middot -J ~~~tfl~f1ilijrofcttl - ~middotroJift~~~m EP-3642009B A~jIJ

c -4-1f1iLt~rw n F1fJLfpoundrq t=n

Nature of Designated Project 1lli_[flfrCi HRj lmiddot1Jl

The Project is a part of the Central-Wan Chai Bypass project (The CWB project will involve construction of a trunk road and its road tunnel more than 800m length between portals)

JltIf~Jfi HJJ 1 l 1 f~i1f S~Ht1I]Erri HA~ - iil~M (C wBJJpoundIC1 HJvfl~~l1- fiU ~1~lliJ_JAu~IL~RmiddotJft~MliM800I~A~f r middotrj[~jill )

Location of Designated Project Wan Chai West harbour-front area Hong Kong 1ilJtJJPtl H A~tttl~ The location ofthe Project is shovn in Fi gures la and lb of this Permit

-~~]~( (pgPj )

_[tJLJ(j HA~tttrlill~ f~fj~ 4~f oft] IN] Iaamp_IN] I b[AJ

Scale and Scope of Designated Project fi=iitLt~PCi 1-J A~tflttHJJitlli[l

The scope of the Project mainly includes bull construction ofa du al three-lane trunk road tunnel of approx imate) 3 1 Om in

length (including the substructure of Middle Ventilation Building) and two slip roads

(part of the CWB project )

Remark s

bull The permanent and temporary reclamation and associated dredging orks re lated to the CWB construction are separately covered by the environmental perm it No EP-35612009 issued to the Civil Engineering and Development Department (CEDD)

I j=~rfi jj A~iuiltj plusmn~hltk bull ~~fll-(lt~J 3 I oj~FI~-=~~ E_(rJ ( f rjj~flli li1~ 1 I )4illiR~ktlJlfigJt11Fi) U

Bt~~~~

(CWB_LtJIJDHH~ - 15f M )

iW1l ijm~i Jfkilifl1tDfltl~ ~k ~o~~MBrttfiJI fECf2lJr5tfi~tr~JtL1poundgt J- _L lhlHi ll~llR-J~lfitif oJmUiFoHtW~lJ11[ EP-3562009)

- 5 shy

( Environmental Permit No FEP-1213642009D

f~fflWF ufafi~~~ilt FEP-1 236412009D

PART C (PERMJT CONDITIONS)

1 General Conditions

11 The Permit Holder and any person Ori--ing on the Project shall comply with a ll condit ions set out in thi s Permit Any non-compliance b) any person may constitute a contravention of the Environmenta l Impact Assessment Ordinance (E IAO) (Cap499) and may become the subject of appropriate action being taken under the Ordinance

12 The Permit Holder shall ensure fu ll compliance with al l legis lation from time to time in force including ithout limi tation to the Ai r Pollution Control Ord inance (Cap 3 11 ) Water Pollution Contro l Ordi nance (Cap 358) Noise Control Ordinance (Cap 400) and Waste Disposa l Ord inance (Cap 3 54) This Perm it does not of itself constitute any ground of defense aga inst any proceed ings instituted under any legislation or imp ly any approva l under an) legislation

13 The Permit Holder shall make copies of this Permit together with a ll documents referred to in this Permit and the documents referred to in Part A of this Permit read ily available at all times for inspect ion by the Di rector or his authori zed officers at all sitesoffice covered by th is Perm it Any reference to the Permit shall incl ude a ll documents referred to in the Permit and also the relevant documents in the Register

I4 The Permit Holder shall give a copy of this Permit to the person(s) in charge of the site(s) and ensure that such person(s) ful ly understa nds all cond it ions and all req uirements incorporated by the Permit The site(s) refers to site(s) of construction of the Project and shall mean the same hereafter

15 The Permit Holder shall d isplay conspicuously a copy of this Permit on the construct ion site(s) at a I I eh icular site entrancesex its or at a convenient location for pub I ic middot s information at a 11 times The Permit Holder shall ensure that the most updated in formation about the Permi t including any amended Permit is di sp layed at such locat ions If the Permit Holder surrenders a part or the whole of this Permit the notice he sends to the Director shall also be displayed at the same locations as the original Permit The suspended varied or cance ll ed Permit shall be removed from disp lay at the construction site(s)

16 The Permit Holder shal l construct the Project in accordance with the project description in Part B of this Perm it (hereafter referred to as the Project)

17 The Permit Holder shal l ensu re that the Project is designed and constructed in accordance ith the middot relevant information and recommenda tions described in the approved CWBampIECL EIA Report (Register No AEIAR-04 1 200 I) the approved WDIIampCWB El A Report (Register No AEIA R- 1252008) the approved CRIII El A Report (Register No AEIAR-040200 I) the app lication documents for environmenta l perm it other relevant documents in the Regi ster and the information or mitigation measures described in this Permit and mitigation measu res to be recommended in submissions that shal l be deposited vi th or approved by the Director as a result of perm it condit ions contained in this Permit and mitigation measures to be recommend ed under on-going surveillance and monitorin g activit ies during a ll stages of the Project Where recommendations referred to in the documents of the Register are not expressly referred to in thi s Permit such recommendations are nevertheless to be implemented unless express) exc luded or impliedly amended in thi s Permit The Project is part of the CWB project

18 Al l deposited subm issions as required under thi s Permit shall be rect ified and

- 6shy

( Environmental Permit No FEP-12364 1200910

f~~~F uJm~5J1t FEP- 12364200910

accordance ith the comments if any made by the Director within one month of the receipt of the Director s comments or otherwise specified by the Director

19 All submiss ions approved by the Director all submissions deposited withou t comments by the Director or al l su bmissions rectified in accordance ith comments by the Director under this Permit shall be construed as part of the permit cond itions described in Pan C of th is Permit Any variation of the submissions shall be approved by the Director in writ ing or as prescribed in the relevant permit cond itions Any non-compliance ith the submissions may constitute a contra ention of the Em ironmental Impact Assessment Ordinance (Cap499) All submissions or any variation of the submiss ions shall be certified by the Environmenta l Team (ET) Leader and verified by the Independen t Environmental Checker (IEC) employed for the CWB project before submitting to the Director under this permit (see note 7)

110 The Perm it Holder shall release all final ized submissions as required under this Permit to the publ ic by depositing copies in the Environmenta l Impact Assessment Ordinance Register Offi ce or in any other places or any internet websites as specified by the Director or by any oth er means as specified by the Director for publi c inspection For this purpose the Permit Holder sha ll provide sufficient copies of the submiss ions

111 All submissions to the Director required under this Permit shall be delivered either in person or by registered ma il to the Environmenta l Im pact Assessment Ord inance Register Office (cu rrently at 27 F Southern Cen tre 130 Hennessy Road Wanchai Hong Kong) Electronic copie of al l fina lized submiss ions required under this Permit shall be prepared in H) per Text Markup Language (HTML) (version 40 or later) and in Portable Document Formflt (PDF version 40 or later) unless othem ise agreed by the Director and slull l be submitted at the same time as the hard copies

2 Special Conditions

2 1-22 fNot Used]

Environmenta l Project Committee (ENPC)

23 To Oe rsee and fac ilitate effecti ve contro l of the cumul ative environmental im pacts arising from potential multiple contracts for the construction of the en ti re Wan Chai Development Phase 11 (WDII ) and Central-Wan Chai Bypass (CWB) (hereafter referred to as the who le Project) the Permit Holder shall take part as a member of Envi ronmental Project Committee (EN PC) set up for the hole proj ect (see note 8)

The ENPC shall make recommendation to enhance the monitoring and aud it of the em iron mental performance of the whole project and other relevflnt nea rby projects on top of requi rements as set out in Conditions 31 to 42 of this Permit or corresponding set out under subsequent Environmental Permits issued for the hole project and other relevant nearby projects (see notes 7 and 8)

24 -28 [Not Used]

Measu1middotes to Mitigate Constn1ction Noise Impact

29

( Environmental Permit No FEP-12364 12009D

f~fflXr wJ ~ft~~~m FEP-1213642009 0

two weeks prior to the commencement of construction of the corresponding component(s) of the Proj ect four hard copies and one electroni c copy of the construction noise management pl an consisting of la) out plan(s) in the scale of I 1000 or other appropriate scal e and explanatory statement(s) showing the noise mitigat ion measures to include the use of movabletemporary noise barriers the use of quiet po~ered mechanical equipments and the adopt ion of multiple-phase construction schedules where appropriate The submission(s) shall be ceriified by the ET Leader and verified by the I EC as conforming to the relevant inform ation and recommendations contained in the apprO ed CWBamplECL El A Report (Register No AEIAR-OJI 200 I) and the WDII ampCWB EIA Report (Register No AEIAR-1252008) before deposit ~ith the Di rector All measures recommended in the fi nalised submission(s) under th is Condition shall be full y and proper) implemented Measures co ered by other pollution control Ord inances hall not be included in this construction noise management plan (see note 8)

2 I 0 -2 13 [Not Used]

Measures to Mitigate Landscape and Visual Impact

214 To reduce the landsca pe and visua l impact during construction stage of the Project the Permit Holder shall implement a series of landscape and isualm itigati on measures The Permit Holder shall at least one month before the commencement of corresponding parts of landscape works of th e Project deposit with the Director four hard cop ies and one electronic copy of landscape plan(s) The landscape plan(s) sha ll show th e design detail s locations implementation programme maintenance and management schedules and drm ings in the sca le of 1 I 000 or other appropriate sca le of the landscape and visual mit igation measures of th e Project Before submission to the Director the landscape plan(s) shall be cer1ified by the ET Leader and verified by the I EC as conforming to the relevant in formation and recommendat ions contained in the apprOed CWBampIECL EIA Report (Regi ter No AEIAR-0412001) and the WDII ampCWB ElA Report (Register No A El A R-1252008) A 11 measures recommended in the fin a I ised su b m ission(s) under th is Condition shall be fu lly and properly implemented (see note 8)

3 Environmental Monitoring and Audit Requirements

31 The EMampA programme shall be implemented in accordance ith the procedures and requirements as set out in the updated EMampA Manual approved for the CWB project (See note 8) An) major changes to the programme shall be justified by the ET Leader and verifi ed by the IEC employed for the CWB project (see note 7) as conforming to the information and requirements contained in the updated EMampA Manua l

32 Samples measurements and necessary remed ial actions shall be taken in accordance with the requirements of the updated EMampA Manual for the CWB project (note 8) by (a) conducting baseline env ironmental monitoring (b) conducting impact monitoring (c) carrying out remedia l actions described in EventAction Plans of the updated EMampA

Manual in accordance with the time frames set out in EventAction Plans or as agreed by the Director in case here specified criteria in the updated EMampA Man ual approved are exceeded and

(d) logging and keeping records of deta ils of (a) to (c) above for a ll parameters within 3 working days of co llection of data or completi on of remedial action(s) for the purpose of preparing and submitting the monthly EMampA Reports and to make avai lab le for inspection

- 8 shy

c Environmental Permit No FEP-12364 middot2009tD

f~JR~fufiiftf~t FEP-1 2 36-+120090

33 [Not Used]

34 Four hard copies and one electronic copy of monthly EMampA Report shall be submitted to the Director Vithin I 0 working days after th e end of each reporting month The EMampA Report s shall inc lude a summary of all non-compl iance (exceedances) of th e envi ronmental quality performance limits (Action and Limit Levels) In compiling this monthly EMampA Report all relevant cumulative const ruction impacts due to concurrent activi ties of the concurrent projects includ ing the Cen tral Reclamation Phase Ill and the Wan Chai Demiddotelopment Phase 11 projects shall be addressed The submiss ions shal l be verified by the IEC emplo)ed for the CWB project (see note 8) Addit ional copies of the submiss ion sha ll be prO ided to the Director upon request by the Director

35 Al l env ironmental monitoring and audit data submitted under this Perm it shal l be true alid and correct

4 Elecflmiddotonic Reporting of EMampA Information

f I To facil itate public inspection of th e Baseline Monitoring Report and regu lar EMampA Reports ia the EIAO Internet Webs ite and at the EJAO Register OITice electronic copies of these Reports shall be prepared in Hyper Text Markup Language (HTML) (version 40 or later) and in Portable Document Format (PDF version -LO or later) unless otherwise agreed by the Director and shall be submitted at the same time as the hardcop ies a described in Condition 34 of th is Permit For the I-ITML version a content page capable of providing h) per ink to each section and sub-section of these Reports shall be included in the beginning of the document H) per inks to all figures drawings and tab les in these Reports shall be provided in the main text from here the respective references are made All graphics in these Reports shall be in interl aced GIF format unless otherwise agreed by the Director The content of the electronic copies of these Reports must be the same as the hardcopies

42 All ellmiddotironmentalmonitori ng data desc ribed in Condition 41 above shall be made a ailablc to the public ia a dedicated eb site to be set up for the CWB project (see note 9) in the shortest practicable time and in no event later than two vveeks after the relevant ell ironmentalmonitoring data are co llected or become ava il able unless othen ise agreed with th e Director

Notes

I This Permit consists of three parts namely PART A (Main Permit) PART B (Descript ion of Designated Project) and PART C (Perm it Conditions) Any person relying on th is perm it should obtain independent legal advice on the lega l implicat ions under the Ordinance and the fo llowing notes are for genera l info rmation only

2 If there is a breach of any conditions of this Permit the Director or his authorized officer ma) ~ ith the consent of the Secretar for the Environment order the cessat ion of associated work unti I the remedia l action is taken in respect of the resultant em ironmental damage and in that case the Permit Holder shall not carry out any associated works without the permiss ion of the Director or his authorized offi cer

3 The Permit Holder ma) apply under Sect ion 13 of th e Ordinance to the Director for a variation of the conditions of this Permit The Permit Holder shall replace the original permit di splayed on the construction site b) the amended perm it

4 A person who assumes the responsibility for the vvhole or a part of the designated project(s) may

- 9shy

c Environmental Permit No FEP- I 2 3642009 D

fftffl~jur-q~~~middot1pound FEP-12364 2009 0

before he assumes responsibilit) of the designated project(s) appl) under Section 12 of the Ordinance to the Di rector for a further ell ironmental permit

5 Under Section 14 of the Ordinance the Director ma~ ith the consent of the ecretary for the Environment suspend var or cancel this Permit The suspended varied or cancelled Permit shall be removed from displa) at the construction site

6 If this Permit is cancelled or surrendered during construction of th e Project another em ironmental permit must be obtained under the Ordinance before the Project could be continued lt is an offence under secti on 26( I) of the Ordinance to construct or operate a designated project li sted in Part I of schedule 2 of the Ordinance v ithout a va lid environmental permit

7 Higlm ays Department (H) D) the Holder of Env ironmental Permit (EP) No EP-3642009 is requ ired under EP-3642009 or any subsequent EP amended b) the Director under the Ord inance (i) to establish an Em ironmental Team (ET)~ hich shall be headed b) an ET Leader (ii) to emplo) an Independent Em ironmental Checker (IEC) (i ii) to liaise ith the Holder of Em ironmcntal Permit No EP-3562009 on to jointly set up an

Environmental Project Committee (EN PC)~ and (i) to liai se with the Holder of Em ironmental Permit No EP-3562009 to jointly set up a

Communit) Liaison Group (CLG) for the CWB project

8 H) D the Holder of EP-3642009 is required under EP-3642009 or any subsequent EP amend ed by the Director under the Ordinance (i) to notify the Director in Hiting the commencement date ofconstruction of the CWB project (i i) to notify the Director the date of sett ing up the EN PC (iii) to notif) the Director the date of setting up the CLG (iv) to submit to the Director for approva l the updated Environmental Monitoring and Audit

Manual (updated EMampA Manual) () to inform the Director in riling the management organ ization of the mai n construction

companies andor any form of joint entures associated i th the construction of the CWB project

( i) to deposit ith the Director a deta iled works schedu le and locat ion plans ( ii) to deposit v ith the Director a construction noise management plan ( iii) to deposit~ ith the Director an operationa l air qual it management plan (ix) to deposit middot ith the Director landscape plan(s) (x) to depos it ~ ith the Director an addit ional mitigation plan for Slip Road 8 (x i) to submit to the Director the Baseline Monitoring Report and (-ii) to submit to the Director the month ) EMampA Reports for the CWB project

9 I I) D the Holder of Env ironmenta l Permit EP-3642009 is required under EP-3642009 or any subsequent EP amended by the Director under the Ordinance (i) to implement the proposed construction Orks of CWB including its Road Tunne l and Slip

Roads ventilation buildings and ent shaft(s) at the location sho n in Figure I of EP-36-l2009 together ith the relevant environmental mitigation measures and

(ii) to set up a dedicated eb site and notify the Director in writing the Internet address here the environmental monitoring and project data is to be placed

for the CWB project

I0 Any person vho constructs the Project contrar middot to the conditions in the Permit and is convicted of an offen ce under the Ordinance is liab le shy

( Environmemal Permit No FEP- 12364 12009D

fRmH uJJff~fifJfE FEP-123642009D

(i) on a first conviction on indictment to a fine of$ 2 million and to imprisonment for 6 months

(ii) on a second or subsequen t conviction on ind ictment to a fi ne of $ 5 mil lion and to imprisonment for years

(iii) on a first summary conviction to a fine at leve l 6 and to imprisonment for 6 months

(iv) on a second or subsequent summary conviction to a fi ne of$1 mi llion and to imprisonment for 1 year and

(v) in any case here the offence is of a contin uing nature the court or magistrate may impose a fine of$ 1 0000 fo r each day on v hich he is sat isfied the offence continued

1 I The Permit Holder may appea l aga inst any condit ion of this Permit under Section I 7 of the Ord inance i thi n 30 days of receipt of this Permit

12 The Note are for general reference only and that the Perm it Holder should refer to the EIA Ord inance for deta ils and seek independent legal advice

Environmental Permit No FEP- 12136412009D IlftilrMT-Zfc C~ I 6 I 0 I~JYliJT nJ ~v~IH ~JIIt FEP-12 3 4 2 09 D

- 11 shy

( Environmental Permit No FEP- 123642009 D

J~Jff~f oJdfr~f-6~ FEP- 1236-12009 bull0

Table la

[Not used]

Table l b Exha ust Related Design Criteria of the Ccnt1middotal Ventilation Building and t he East Ventilation Building and its Vent Shaft (based on Table 311 of the WDIIampCWB EIA Report (Registe1middot No AElAR-1252008)

Minimum mid-dischabullmiddotge Cross-sectional Exit velocity Exhaust

height (meter above (m s1

)area of stack (m2) direction

ground)

Vertica l Central Venti lation 219 8 175

Bu ildi ng (CVB)

Incl ined 45 Vent shaft of the

degree up ard East Venti lation

94 8 1625 (discharge Bui lding

tO~ ards sea (EVB)

direction)

Notes This Table shall be read in conjunction ith Condition 213 and Figure I of this Perm it The vent shaft of CVB i11 be incorporated ~ ith in the CVB

The vent shaft of EVB il l be separated from the EVB and located at the eastern break at er of the Cause~ ay Bay T) phoon Shelter

- 12shy

--shy N

COVERED BY APPROVED CWB amp IECL EIA REPIJH E IAO REGISTER NO AEIAR - ~12001 I

[

CENTRAL RECL PHASE ~-

~ 11 middott l l J

-shy -~ __r _______ __--shy- I

I

reg +

I fmiddotll

71 lt1

I

~ I

111~Srt ~ ~

Proj ect Title Wan C hai Development Phase 11 - Central-Wan C hai 13y1Jass at W~n C hai West (Contract No 11 K20 1208)- Tunnel Works

I~lfg glf ffr~famp~ -W-J- cfJtl~tT-~lli - ~ffflpoundi~ji (fltlt~J~ 11 K20 1208) ~ill I fpound

Environmental Permil No FEP 123642009D

[ ~

Figure la Location of the Project [sect la Ifi~Fifrr~

Bnuudu ofStmh 1r~a tl i 1J Itiioii~l

F cll l lf Rcclamatt OII hpound JnIIJJ

Tnm~ Rood 111 lunncl ]~yJ

t lti oadc Inn1~ Rltbullad amp iltp Road 1111111 bull bull wgtbull tl~~middot

~hp RuaJ on I leatccl 1ruuurc 1r~middot1Yn

t Iht li lUIC 11 plqlUCcl ha--rd (111 II~UI( 1 ell Jl plit Jfl(lll hlf h ulhcr l m trnnmcn1c11Pel ml c pp lliIIU)Il ~(l 11 ~- 1 71201h))

( f[~flJtf it~bullt fJi(Jl tq bull)1 ( ftt middot l-J 11 1-17 I02U ih) Jf la 11middot~ )EI51mtrrcrm~~~ FpoundP- 12J64t2oo9 o

shy

shy

1

Legend lffiiIJ

1 middot~ SI n BOUNDARY i-

VICTO~lt IIARIICUR

GDIJ1 OJlCl100 COl GC0412~7Cl1001C02

Project Tit le Wan C lwi Development Phase 11- Central-Wan Chai Bypass at Wan C hai West Figubullmiddote 1 b General Layout of the Pbullmiddotojcct (Contract No HY201208)- T unnel Worllts 1MJ 1 b I~~g 111iJFiJ~I~Jfisect~flJ ~fr~fm~=Wi - cppound95air~ili - ~ffgsectt~ (~~g~ljf HK20 1208)shy~iliifM

1Tillbull filHC tl~ prepared h I H-171 110161)1C(f ltm lrBurc IIK1l Appluauon h1r lunher Fmmlnmelllal l~rmu ( pphcat rcm rn Environmental Permit No FEP- 1 236~20090 t11 bullfll~ ppld(Jllcl middotJ~J I 1bullbull1 1 W n I-1 12CI16)il h illt~l l$1-IJlffPJID~liR FEP- 123642009D

Page 4: :Jn - EPD · 2016. 12. 14. · referenced ( 19) in Ax(-1) to EP2/H4 'C/09 11. 7. Environmental Permit Issued - Permit No.: EP-356/2009 issued to Civil Engineering and Development

( Environmental Permit No FEP- 123642009D

fiV5Ufofill~liHft FEP-123642009D

[Hereinafter referred to as the CRI II EIA Report] - Environmental Monitoring and Audit Manual - Executive Summary

6 The Director s letter of approval of the CRI II El A Report dated 31 August 200 I referenced ( 19) in Ax(-1) to EP2H4 C09 11

7 Environmenta l Permit Issued - Permit No EP-3562009 issued to Civil Engineering and Development Department on 30 July 2009 for construction of the following designated projects (i) Permanent and temporary reclamation works including associated dredging

Orks in Wan Chai Development Phase 11 (WDI I) area (referred to as DP3 in the WDIIampCWB EIA Report)

(i i) Wan Chai East Sewage Outfall (referred to as DP5 in the WDIIampCWB EIA Report) and

(iii) Dredging for the Cross-harbour Water Mains from Wan Chai to Tsim Sha Tsui (referred to as DP6 in the WDI IampCWB EIA Report)

8 Application for Environmental Permit and attachments submitted by the Permit Holder on 27 July 2009 (Appl ication No AEP-36412009)

9 Environmental Permit (No EP-3642009) issued on 17 August 2009

10 Application documents for Variation of Environmental Permit including all attachments submitted by the Permit Holder on 28 July 20 I 0 (Application No VEP-321 20 I 0)

11 Environmental Permit issued - Permit No EP-3642009A issued on 4 August 201 0

12 Application documents for Variation of Environmental Permit including all attachments submitted by the Permit Holder on 3 1 August 20 12 (Application No VEP-374 20 12)

13 Environmental Permit issued - Permit No EP-36412009B issued on 20 September 20 12

14 Appl ication for Further Environmental Permit including all attachments submitted on 8 Februaty 20 13 (Appl icat ion No FEP- 14420 13)

15 Appl icat ion documents for Variation of Environmental Permit including all anachments submitted by the Permit Holder on 20 June 20 14 (Appl ication No VEP-44320 14)

16 Environmental Permit issued- Permit No EP-3642009C issued on 11 July 20 14

17 Appl ication documents for Variation of Environmental Permit including all attachments submitted by the Pennit Holder on 28 October 2015 (Appl ication No VEP-485120 15)

18 Environmental Perm it issued - Perm it No EP-3642009 D issued on 24 November 2015

19 Application for Further Environmental Permit including al l attachments submitted on 26 Ju ly 20 16 (Application No FEP-171 20 16)

I

- 2 -

c Environmental Permit No FEP-12136412009D

~ii~F uJ~mQfj( FEP-123642009 D

A EIAR-0~ 1200 I) - f~Jftl~~~f~~fi- (20011f7 F ) [ f ffli 1 CW Bamp I ECUf ril in ) - f~lft~~~t~ f-IRt - fl jfj 11Kl ~

~-ampti~2ool lf-8 ~ 31 H ~tHmiddotKWBampI Ec u~ ~-r yenHi 8Hlt1Hg f17 mt~ ~ ( 19) in Ax(2) to EP2l-14A 10 11

13 WHtlt~~I-Jil]~~lYlamp Jif1~middot~f~~ili (ft ~c lift ~_w ~di A EIAR-1252008) bull f~Jftl~~~middotjif~~yenfHlf (20071j- 12 =j )[ Ffilj r WDIIampCWBf~riHifi- ) bull J~fl~~15~ fllfr bull f fjfjjJij~ bull J lJf~HitHHl~P~fliifsectIJ~8 (1) (~fiU~2008 1f3 F3 11 H middot 2008lj4J=l9H amp

2008f-11 F 14 Hf1Tf)pound~~fJ~-717-Qf4

4 f-amp~~2008 11 12F3 11 H1tHmiddotHttU~ WDIIampCWB fg riJ1yen fi- A~ (Fi it-middot M~~ ~fE (85) in EP2tll4 S3115 Pt 2

5 l] 1 ItltF jmiddoti1J~ II 1 )YJ - ~111t middot ttrliJfWJ middot ~l~ImiddotW~~Nli~clliPH~fft AEIAR-0~0100 I) bull fgtffh~~~jUI~Hlf (200 11 P J=l )[ 1- jTJ 1 C RIll pound~ H-ti fi- ] bull fnmYili~Wft r-~nt bull fjjfjJJ)j~

6 f-ampti~200I 1-8F3 31 H ~ttf1 CR III~ r ii n- fl~ Jttfldf middot ~~~ pound ~-IBt lt19) in Ax(4) to EP2H4Ci09 11

7 ~lf~tfi~J~mrif uJ(Z- rif uf~(t~mffiEP-35612009 li20091p )=l30 F-1 f~middotf~J _Ljtffit~~lAilHilH HfitifilrQtJ (i) pound~i 6tk~~ jmiddotDIJB~l~JHJ k 11]i~fhyenttfij_[f~( t~HkflllfMQLl_L~)

( W D 11 amp C W B Jg ~I 1 n IJ fiTJ -- D P 3--) (ii) ~1 ( bullJ]Ij(t)l 1j(U( W D 11 ampC W B f~ rimiddotJ $U fT IAJ fjTJ middotmiddot D P 5 ) amp (iii) rf( yen tIUi~JI(Jij frrAJtQJtif~( W D 11 ampC W Big nhit fir IAJ fii

--DP6)

8 rifcJiH41T AE2009 1p )1 27 Ht~XH~r~mrifufjQLjJ~i1)ftJlfftft-U-Jlri81r ~il ~flf AEP-36~2009)

I 0 riF ufJ~H-11 Afi~20 I Ofj= 7F 28 Ht~ X A~ Jiamp~J-Qrir uf6LJrriiLZffl11~1Wiffft (j(Ljrrifillj~mm YEP-32 120 I 0)

12 jf cfrimiddot1t-1TAU~20 12J~ 8F3 31 H 1poundi~l~ rlif(f~Vffrif uf~tLjr ~i1XItlMr1T11flt ft(Ljr~j1g~~Wi YEP-37~2012)

14 j~ 2013 11- 2 I=J 8 Htpound~flmiddot~~frfi~JfRflKruftfLjr~jjXf~8frifiiT11fitfflt4J ~ri 1 f ~~lit FEP-1442013)

( Environmental Permit No FEP-1 2 3642009 D

I~ijlJfuH(g~~ft FEP-12 364 2009 D

f~(EP~ifilf~~~it VEP-44312014)

16 ~ri~~w~~JJlifuf~middot1 - ~foJ~tl~~5i1( EP -3642009C fi 2014lf7 J=l ll R ~ ~1

17 gfoJllit-trAX 20 15 f 10 E3 28 Ht~XA~JL1~~1ft~fofi(fLJ-l~fLzft-ilfrlirfT~ ~fi ff(LJ-lcii11 1 ~~~~t YEP-48520 15)

18 C~i~~R~l~JfioJillt - ~FoJ~tl~hl~ft EP-3642009D j~ 20151 ~ 11 Fl24 Hi ~

19 n~ 20 16 1f 7 J=l 26 H tE~R~trJrAJf~ricif oJ(14JJi Xft-fjfJjrtrtr~f11t-lt lfJ~j ~ ~W~ft FEP-171 20 16)

August 20 16 2016 f 8 Mt 13

Date ( en YK o g) Principal Environmental Protecti Officer HWJ for Director of Environmental Protection

r~~fw-fit1~~wamp ltHJmf~lftf~iiliplusmnff O(WiVc (-(f)

- 4shy

( Environmental Permit No FEP-1 23642009D

J~iflR1 oJ]litf~l]rff FEP-12364i200910

PART B (DESCRIPTION OF DESIGNATED PROJECT) B$ (sect~I~~ 13 89~~)

Hereunder is the description of the designated project mentioned in Part A of this environmental pennit (hereinafter referred to as the Perm it ) fYIJM4~mliJ1 uJaf( Hi4~f unampmiddotmiddot)A ~IfiTJJpoundQilfijtl1JEIfj_J~i rl l~~5ii9J

Title of Designated Proj ect Wan Chai Development Phase 11- Central - Wan Chai Bypass at Wan Chai West m~_[tP~HB~ ~ lli (Contract No HK20 1208)- Tunnel Works

-as part of the middotmiddotc entral-Wan Chai Bypass including its Road Tunnel and Slip Roads (the CWB project) which is covered in the Environmental Permit No EP-3642009 B (This designmed proj ect is hereinafter referred to as middotthe Project)

~1 HU~~LWJ shy I 1 1~~1H~~jfj - i~ i ff19H ((~~~~~lid~ilt H K20 1208) shy l~lli _[fpound

- IltItpound~ ijJ~lH f~Ut(~jiJtf jmiddot fj[ j~jlliJid2lH~lM (C wBIf2Xi F=l )RJ- yensect1 fB middot -J ~~~tfl~f1ilijrofcttl - ~middotroJift~~~m EP-3642009B A~jIJ

c -4-1f1iLt~rw n F1fJLfpoundrq t=n

Nature of Designated Project 1lli_[flfrCi HRj lmiddot1Jl

The Project is a part of the Central-Wan Chai Bypass project (The CWB project will involve construction of a trunk road and its road tunnel more than 800m length between portals)

JltIf~Jfi HJJ 1 l 1 f~i1f S~Ht1I]Erri HA~ - iil~M (C wBJJpoundIC1 HJvfl~~l1- fiU ~1~lliJ_JAu~IL~RmiddotJft~MliM800I~A~f r middotrj[~jill )

Location of Designated Project Wan Chai West harbour-front area Hong Kong 1ilJtJJPtl H A~tttl~ The location ofthe Project is shovn in Fi gures la and lb of this Permit

-~~]~( (pgPj )

_[tJLJ(j HA~tttrlill~ f~fj~ 4~f oft] IN] Iaamp_IN] I b[AJ

Scale and Scope of Designated Project fi=iitLt~PCi 1-J A~tflttHJJitlli[l

The scope of the Project mainly includes bull construction ofa du al three-lane trunk road tunnel of approx imate) 3 1 Om in

length (including the substructure of Middle Ventilation Building) and two slip roads

(part of the CWB project )

Remark s

bull The permanent and temporary reclamation and associated dredging orks re lated to the CWB construction are separately covered by the environmental perm it No EP-35612009 issued to the Civil Engineering and Development Department (CEDD)

I j=~rfi jj A~iuiltj plusmn~hltk bull ~~fll-(lt~J 3 I oj~FI~-=~~ E_(rJ ( f rjj~flli li1~ 1 I )4illiR~ktlJlfigJt11Fi) U

Bt~~~~

(CWB_LtJIJDHH~ - 15f M )

iW1l ijm~i Jfkilifl1tDfltl~ ~k ~o~~MBrttfiJI fECf2lJr5tfi~tr~JtL1poundgt J- _L lhlHi ll~llR-J~lfitif oJmUiFoHtW~lJ11[ EP-3562009)

- 5 shy

( Environmental Permit No FEP-1213642009D

f~fflWF ufafi~~~ilt FEP-1 236412009D

PART C (PERMJT CONDITIONS)

1 General Conditions

11 The Permit Holder and any person Ori--ing on the Project shall comply with a ll condit ions set out in thi s Permit Any non-compliance b) any person may constitute a contravention of the Environmenta l Impact Assessment Ordinance (E IAO) (Cap499) and may become the subject of appropriate action being taken under the Ordinance

12 The Permit Holder shall ensure fu ll compliance with al l legis lation from time to time in force including ithout limi tation to the Ai r Pollution Control Ord inance (Cap 3 11 ) Water Pollution Contro l Ordi nance (Cap 358) Noise Control Ordinance (Cap 400) and Waste Disposa l Ord inance (Cap 3 54) This Perm it does not of itself constitute any ground of defense aga inst any proceed ings instituted under any legislation or imp ly any approva l under an) legislation

13 The Permit Holder shall make copies of this Permit together with a ll documents referred to in this Permit and the documents referred to in Part A of this Permit read ily available at all times for inspect ion by the Di rector or his authori zed officers at all sitesoffice covered by th is Perm it Any reference to the Permit shall incl ude a ll documents referred to in the Permit and also the relevant documents in the Register

I4 The Permit Holder shall give a copy of this Permit to the person(s) in charge of the site(s) and ensure that such person(s) ful ly understa nds all cond it ions and all req uirements incorporated by the Permit The site(s) refers to site(s) of construction of the Project and shall mean the same hereafter

15 The Permit Holder shall d isplay conspicuously a copy of this Permit on the construct ion site(s) at a I I eh icular site entrancesex its or at a convenient location for pub I ic middot s information at a 11 times The Permit Holder shall ensure that the most updated in formation about the Permi t including any amended Permit is di sp layed at such locat ions If the Permit Holder surrenders a part or the whole of this Permit the notice he sends to the Director shall also be displayed at the same locations as the original Permit The suspended varied or cance ll ed Permit shall be removed from disp lay at the construction site(s)

16 The Permit Holder shal l construct the Project in accordance with the project description in Part B of this Perm it (hereafter referred to as the Project)

17 The Permit Holder shal l ensu re that the Project is designed and constructed in accordance ith the middot relevant information and recommenda tions described in the approved CWBampIECL EIA Report (Register No AEIAR-04 1 200 I) the approved WDIIampCWB El A Report (Register No AEIA R- 1252008) the approved CRIII El A Report (Register No AEIAR-040200 I) the app lication documents for environmenta l perm it other relevant documents in the Regi ster and the information or mitigation measures described in this Permit and mitigation measu res to be recommended in submissions that shal l be deposited vi th or approved by the Director as a result of perm it condit ions contained in this Permit and mitigation measures to be recommend ed under on-going surveillance and monitorin g activit ies during a ll stages of the Project Where recommendations referred to in the documents of the Register are not expressly referred to in thi s Permit such recommendations are nevertheless to be implemented unless express) exc luded or impliedly amended in thi s Permit The Project is part of the CWB project

18 Al l deposited subm issions as required under thi s Permit shall be rect ified and

- 6shy

( Environmental Permit No FEP-12364 1200910

f~~~F uJm~5J1t FEP- 12364200910

accordance ith the comments if any made by the Director within one month of the receipt of the Director s comments or otherwise specified by the Director

19 All submiss ions approved by the Director all submissions deposited withou t comments by the Director or al l su bmissions rectified in accordance ith comments by the Director under this Permit shall be construed as part of the permit cond itions described in Pan C of th is Permit Any variation of the submissions shall be approved by the Director in writ ing or as prescribed in the relevant permit cond itions Any non-compliance ith the submissions may constitute a contra ention of the Em ironmental Impact Assessment Ordinance (Cap499) All submissions or any variation of the submiss ions shall be certified by the Environmenta l Team (ET) Leader and verified by the Independen t Environmental Checker (IEC) employed for the CWB project before submitting to the Director under this permit (see note 7)

110 The Perm it Holder shall release all final ized submissions as required under this Permit to the publ ic by depositing copies in the Environmenta l Impact Assessment Ordinance Register Offi ce or in any other places or any internet websites as specified by the Director or by any oth er means as specified by the Director for publi c inspection For this purpose the Permit Holder sha ll provide sufficient copies of the submiss ions

111 All submissions to the Director required under this Permit shall be delivered either in person or by registered ma il to the Environmenta l Im pact Assessment Ord inance Register Office (cu rrently at 27 F Southern Cen tre 130 Hennessy Road Wanchai Hong Kong) Electronic copie of al l fina lized submiss ions required under this Permit shall be prepared in H) per Text Markup Language (HTML) (version 40 or later) and in Portable Document Formflt (PDF version 40 or later) unless othem ise agreed by the Director and slull l be submitted at the same time as the hard copies

2 Special Conditions

2 1-22 fNot Used]

Environmenta l Project Committee (ENPC)

23 To Oe rsee and fac ilitate effecti ve contro l of the cumul ative environmental im pacts arising from potential multiple contracts for the construction of the en ti re Wan Chai Development Phase 11 (WDII ) and Central-Wan Chai Bypass (CWB) (hereafter referred to as the who le Project) the Permit Holder shall take part as a member of Envi ronmental Project Committee (EN PC) set up for the hole proj ect (see note 8)

The ENPC shall make recommendation to enhance the monitoring and aud it of the em iron mental performance of the whole project and other relevflnt nea rby projects on top of requi rements as set out in Conditions 31 to 42 of this Permit or corresponding set out under subsequent Environmental Permits issued for the hole project and other relevant nearby projects (see notes 7 and 8)

24 -28 [Not Used]

Measu1middotes to Mitigate Constn1ction Noise Impact

29

( Environmental Permit No FEP-12364 12009D

f~fflXr wJ ~ft~~~m FEP-1213642009 0

two weeks prior to the commencement of construction of the corresponding component(s) of the Proj ect four hard copies and one electroni c copy of the construction noise management pl an consisting of la) out plan(s) in the scale of I 1000 or other appropriate scal e and explanatory statement(s) showing the noise mitigat ion measures to include the use of movabletemporary noise barriers the use of quiet po~ered mechanical equipments and the adopt ion of multiple-phase construction schedules where appropriate The submission(s) shall be ceriified by the ET Leader and verified by the I EC as conforming to the relevant inform ation and recommendations contained in the apprO ed CWBamplECL El A Report (Register No AEIAR-OJI 200 I) and the WDII ampCWB EIA Report (Register No AEIAR-1252008) before deposit ~ith the Di rector All measures recommended in the fi nalised submission(s) under th is Condition shall be full y and proper) implemented Measures co ered by other pollution control Ord inances hall not be included in this construction noise management plan (see note 8)

2 I 0 -2 13 [Not Used]

Measures to Mitigate Landscape and Visual Impact

214 To reduce the landsca pe and visua l impact during construction stage of the Project the Permit Holder shall implement a series of landscape and isualm itigati on measures The Permit Holder shall at least one month before the commencement of corresponding parts of landscape works of th e Project deposit with the Director four hard cop ies and one electronic copy of landscape plan(s) The landscape plan(s) sha ll show th e design detail s locations implementation programme maintenance and management schedules and drm ings in the sca le of 1 I 000 or other appropriate sca le of the landscape and visual mit igation measures of th e Project Before submission to the Director the landscape plan(s) shall be cer1ified by the ET Leader and verified by the I EC as conforming to the relevant in formation and recommendat ions contained in the apprOed CWBampIECL EIA Report (Regi ter No AEIAR-0412001) and the WDII ampCWB ElA Report (Register No A El A R-1252008) A 11 measures recommended in the fin a I ised su b m ission(s) under th is Condition shall be fu lly and properly implemented (see note 8)

3 Environmental Monitoring and Audit Requirements

31 The EMampA programme shall be implemented in accordance ith the procedures and requirements as set out in the updated EMampA Manual approved for the CWB project (See note 8) An) major changes to the programme shall be justified by the ET Leader and verifi ed by the IEC employed for the CWB project (see note 7) as conforming to the information and requirements contained in the updated EMampA Manua l

32 Samples measurements and necessary remed ial actions shall be taken in accordance with the requirements of the updated EMampA Manual for the CWB project (note 8) by (a) conducting baseline env ironmental monitoring (b) conducting impact monitoring (c) carrying out remedia l actions described in EventAction Plans of the updated EMampA

Manual in accordance with the time frames set out in EventAction Plans or as agreed by the Director in case here specified criteria in the updated EMampA Man ual approved are exceeded and

(d) logging and keeping records of deta ils of (a) to (c) above for a ll parameters within 3 working days of co llection of data or completi on of remedial action(s) for the purpose of preparing and submitting the monthly EMampA Reports and to make avai lab le for inspection

- 8 shy

c Environmental Permit No FEP-12364 middot2009tD

f~JR~fufiiftf~t FEP-1 2 36-+120090

33 [Not Used]

34 Four hard copies and one electronic copy of monthly EMampA Report shall be submitted to the Director Vithin I 0 working days after th e end of each reporting month The EMampA Report s shall inc lude a summary of all non-compl iance (exceedances) of th e envi ronmental quality performance limits (Action and Limit Levels) In compiling this monthly EMampA Report all relevant cumulative const ruction impacts due to concurrent activi ties of the concurrent projects includ ing the Cen tral Reclamation Phase Ill and the Wan Chai Demiddotelopment Phase 11 projects shall be addressed The submiss ions shal l be verified by the IEC emplo)ed for the CWB project (see note 8) Addit ional copies of the submiss ion sha ll be prO ided to the Director upon request by the Director

35 Al l env ironmental monitoring and audit data submitted under this Perm it shal l be true alid and correct

4 Elecflmiddotonic Reporting of EMampA Information

f I To facil itate public inspection of th e Baseline Monitoring Report and regu lar EMampA Reports ia the EIAO Internet Webs ite and at the EJAO Register OITice electronic copies of these Reports shall be prepared in Hyper Text Markup Language (HTML) (version 40 or later) and in Portable Document Format (PDF version -LO or later) unless otherwise agreed by the Director and shall be submitted at the same time as the hardcop ies a described in Condition 34 of th is Permit For the I-ITML version a content page capable of providing h) per ink to each section and sub-section of these Reports shall be included in the beginning of the document H) per inks to all figures drawings and tab les in these Reports shall be provided in the main text from here the respective references are made All graphics in these Reports shall be in interl aced GIF format unless otherwise agreed by the Director The content of the electronic copies of these Reports must be the same as the hardcopies

42 All ellmiddotironmentalmonitori ng data desc ribed in Condition 41 above shall be made a ailablc to the public ia a dedicated eb site to be set up for the CWB project (see note 9) in the shortest practicable time and in no event later than two vveeks after the relevant ell ironmentalmonitoring data are co llected or become ava il able unless othen ise agreed with th e Director

Notes

I This Permit consists of three parts namely PART A (Main Permit) PART B (Descript ion of Designated Project) and PART C (Perm it Conditions) Any person relying on th is perm it should obtain independent legal advice on the lega l implicat ions under the Ordinance and the fo llowing notes are for genera l info rmation only

2 If there is a breach of any conditions of this Permit the Director or his authorized officer ma) ~ ith the consent of the Secretar for the Environment order the cessat ion of associated work unti I the remedia l action is taken in respect of the resultant em ironmental damage and in that case the Permit Holder shall not carry out any associated works without the permiss ion of the Director or his authorized offi cer

3 The Permit Holder ma) apply under Sect ion 13 of th e Ordinance to the Director for a variation of the conditions of this Permit The Permit Holder shall replace the original permit di splayed on the construction site b) the amended perm it

4 A person who assumes the responsibility for the vvhole or a part of the designated project(s) may

- 9shy

c Environmental Permit No FEP- I 2 3642009 D

fftffl~jur-q~~~middot1pound FEP-12364 2009 0

before he assumes responsibilit) of the designated project(s) appl) under Section 12 of the Ordinance to the Di rector for a further ell ironmental permit

5 Under Section 14 of the Ordinance the Director ma~ ith the consent of the ecretary for the Environment suspend var or cancel this Permit The suspended varied or cancelled Permit shall be removed from displa) at the construction site

6 If this Permit is cancelled or surrendered during construction of th e Project another em ironmental permit must be obtained under the Ordinance before the Project could be continued lt is an offence under secti on 26( I) of the Ordinance to construct or operate a designated project li sted in Part I of schedule 2 of the Ordinance v ithout a va lid environmental permit

7 Higlm ays Department (H) D) the Holder of Env ironmental Permit (EP) No EP-3642009 is requ ired under EP-3642009 or any subsequent EP amended b) the Director under the Ord inance (i) to establish an Em ironmental Team (ET)~ hich shall be headed b) an ET Leader (ii) to emplo) an Independent Em ironmental Checker (IEC) (i ii) to liaise ith the Holder of Em ironmcntal Permit No EP-3562009 on to jointly set up an

Environmental Project Committee (EN PC)~ and (i) to liai se with the Holder of Em ironmental Permit No EP-3562009 to jointly set up a

Communit) Liaison Group (CLG) for the CWB project

8 H) D the Holder of EP-3642009 is required under EP-3642009 or any subsequent EP amend ed by the Director under the Ordinance (i) to notify the Director in Hiting the commencement date ofconstruction of the CWB project (i i) to notify the Director the date of sett ing up the EN PC (iii) to notif) the Director the date of setting up the CLG (iv) to submit to the Director for approva l the updated Environmental Monitoring and Audit

Manual (updated EMampA Manual) () to inform the Director in riling the management organ ization of the mai n construction

companies andor any form of joint entures associated i th the construction of the CWB project

( i) to deposit ith the Director a deta iled works schedu le and locat ion plans ( ii) to deposit v ith the Director a construction noise management plan ( iii) to deposit~ ith the Director an operationa l air qual it management plan (ix) to deposit middot ith the Director landscape plan(s) (x) to depos it ~ ith the Director an addit ional mitigation plan for Slip Road 8 (x i) to submit to the Director the Baseline Monitoring Report and (-ii) to submit to the Director the month ) EMampA Reports for the CWB project

9 I I) D the Holder of Env ironmenta l Permit EP-3642009 is required under EP-3642009 or any subsequent EP amended by the Director under the Ordinance (i) to implement the proposed construction Orks of CWB including its Road Tunne l and Slip

Roads ventilation buildings and ent shaft(s) at the location sho n in Figure I of EP-36-l2009 together ith the relevant environmental mitigation measures and

(ii) to set up a dedicated eb site and notify the Director in writing the Internet address here the environmental monitoring and project data is to be placed

for the CWB project

I0 Any person vho constructs the Project contrar middot to the conditions in the Permit and is convicted of an offen ce under the Ordinance is liab le shy

( Environmemal Permit No FEP- 12364 12009D

fRmH uJJff~fifJfE FEP-123642009D

(i) on a first conviction on indictment to a fine of$ 2 million and to imprisonment for 6 months

(ii) on a second or subsequen t conviction on ind ictment to a fi ne of $ 5 mil lion and to imprisonment for years

(iii) on a first summary conviction to a fine at leve l 6 and to imprisonment for 6 months

(iv) on a second or subsequent summary conviction to a fi ne of$1 mi llion and to imprisonment for 1 year and

(v) in any case here the offence is of a contin uing nature the court or magistrate may impose a fine of$ 1 0000 fo r each day on v hich he is sat isfied the offence continued

1 I The Permit Holder may appea l aga inst any condit ion of this Permit under Section I 7 of the Ord inance i thi n 30 days of receipt of this Permit

12 The Note are for general reference only and that the Perm it Holder should refer to the EIA Ord inance for deta ils and seek independent legal advice

Environmental Permit No FEP- 12136412009D IlftilrMT-Zfc C~ I 6 I 0 I~JYliJT nJ ~v~IH ~JIIt FEP-12 3 4 2 09 D

- 11 shy

( Environmental Permit No FEP- 123642009 D

J~Jff~f oJdfr~f-6~ FEP- 1236-12009 bull0

Table la

[Not used]

Table l b Exha ust Related Design Criteria of the Ccnt1middotal Ventilation Building and t he East Ventilation Building and its Vent Shaft (based on Table 311 of the WDIIampCWB EIA Report (Registe1middot No AElAR-1252008)

Minimum mid-dischabullmiddotge Cross-sectional Exit velocity Exhaust

height (meter above (m s1

)area of stack (m2) direction

ground)

Vertica l Central Venti lation 219 8 175

Bu ildi ng (CVB)

Incl ined 45 Vent shaft of the

degree up ard East Venti lation

94 8 1625 (discharge Bui lding

tO~ ards sea (EVB)

direction)

Notes This Table shall be read in conjunction ith Condition 213 and Figure I of this Perm it The vent shaft of CVB i11 be incorporated ~ ith in the CVB

The vent shaft of EVB il l be separated from the EVB and located at the eastern break at er of the Cause~ ay Bay T) phoon Shelter

- 12shy

--shy N

COVERED BY APPROVED CWB amp IECL EIA REPIJH E IAO REGISTER NO AEIAR - ~12001 I

[

CENTRAL RECL PHASE ~-

~ 11 middott l l J

-shy -~ __r _______ __--shy- I

I

reg +

I fmiddotll

71 lt1

I

~ I

111~Srt ~ ~

Proj ect Title Wan C hai Development Phase 11 - Central-Wan C hai 13y1Jass at W~n C hai West (Contract No 11 K20 1208)- Tunnel Works

I~lfg glf ffr~famp~ -W-J- cfJtl~tT-~lli - ~ffflpoundi~ji (fltlt~J~ 11 K20 1208) ~ill I fpound

Environmental Permil No FEP 123642009D

[ ~

Figure la Location of the Project [sect la Ifi~Fifrr~

Bnuudu ofStmh 1r~a tl i 1J Itiioii~l

F cll l lf Rcclamatt OII hpound JnIIJJ

Tnm~ Rood 111 lunncl ]~yJ

t lti oadc Inn1~ Rltbullad amp iltp Road 1111111 bull bull wgtbull tl~~middot

~hp RuaJ on I leatccl 1ruuurc 1r~middot1Yn

t Iht li lUIC 11 plqlUCcl ha--rd (111 II~UI( 1 ell Jl plit Jfl(lll hlf h ulhcr l m trnnmcn1c11Pel ml c pp lliIIU)Il ~(l 11 ~- 1 71201h))

( f[~flJtf it~bullt fJi(Jl tq bull)1 ( ftt middot l-J 11 1-17 I02U ih) Jf la 11middot~ )EI51mtrrcrm~~~ FpoundP- 12J64t2oo9 o

shy

shy

1

Legend lffiiIJ

1 middot~ SI n BOUNDARY i-

VICTO~lt IIARIICUR

GDIJ1 OJlCl100 COl GC0412~7Cl1001C02

Project Tit le Wan C lwi Development Phase 11- Central-Wan Chai Bypass at Wan C hai West Figubullmiddote 1 b General Layout of the Pbullmiddotojcct (Contract No HY201208)- T unnel Worllts 1MJ 1 b I~~g 111iJFiJ~I~Jfisect~flJ ~fr~fm~=Wi - cppound95air~ili - ~ffgsectt~ (~~g~ljf HK20 1208)shy~iliifM

1Tillbull filHC tl~ prepared h I H-171 110161)1C(f ltm lrBurc IIK1l Appluauon h1r lunher Fmmlnmelllal l~rmu ( pphcat rcm rn Environmental Permit No FEP- 1 236~20090 t11 bullfll~ ppld(Jllcl middotJ~J I 1bullbull1 1 W n I-1 12CI16)il h illt~l l$1-IJlffPJID~liR FEP- 123642009D

Page 5: :Jn - EPD · 2016. 12. 14. · referenced ( 19) in Ax(-1) to EP2/H4 'C/09 11. 7. Environmental Permit Issued - Permit No.: EP-356/2009 issued to Civil Engineering and Development

c Environmental Permit No FEP-12136412009D

~ii~F uJ~mQfj( FEP-123642009 D

A EIAR-0~ 1200 I) - f~Jftl~~~f~~fi- (20011f7 F ) [ f ffli 1 CW Bamp I ECUf ril in ) - f~lft~~~t~ f-IRt - fl jfj 11Kl ~

~-ampti~2ool lf-8 ~ 31 H ~tHmiddotKWBampI Ec u~ ~-r yenHi 8Hlt1Hg f17 mt~ ~ ( 19) in Ax(2) to EP2l-14A 10 11

13 WHtlt~~I-Jil]~~lYlamp Jif1~middot~f~~ili (ft ~c lift ~_w ~di A EIAR-1252008) bull f~Jftl~~~middotjif~~yenfHlf (20071j- 12 =j )[ Ffilj r WDIIampCWBf~riHifi- ) bull J~fl~~15~ fllfr bull f fjfjjJij~ bull J lJf~HitHHl~P~fliifsectIJ~8 (1) (~fiU~2008 1f3 F3 11 H middot 2008lj4J=l9H amp

2008f-11 F 14 Hf1Tf)pound~~fJ~-717-Qf4

4 f-amp~~2008 11 12F3 11 H1tHmiddotHttU~ WDIIampCWB fg riJ1yen fi- A~ (Fi it-middot M~~ ~fE (85) in EP2tll4 S3115 Pt 2

5 l] 1 ItltF jmiddoti1J~ II 1 )YJ - ~111t middot ttrliJfWJ middot ~l~ImiddotW~~Nli~clliPH~fft AEIAR-0~0100 I) bull fgtffh~~~jUI~Hlf (200 11 P J=l )[ 1- jTJ 1 C RIll pound~ H-ti fi- ] bull fnmYili~Wft r-~nt bull fjjfjJJ)j~

6 f-ampti~200I 1-8F3 31 H ~ttf1 CR III~ r ii n- fl~ Jttfldf middot ~~~ pound ~-IBt lt19) in Ax(4) to EP2H4Ci09 11

7 ~lf~tfi~J~mrif uJ(Z- rif uf~(t~mffiEP-35612009 li20091p )=l30 F-1 f~middotf~J _Ljtffit~~lAilHilH HfitifilrQtJ (i) pound~i 6tk~~ jmiddotDIJB~l~JHJ k 11]i~fhyenttfij_[f~( t~HkflllfMQLl_L~)

( W D 11 amp C W B Jg ~I 1 n IJ fiTJ -- D P 3--) (ii) ~1 ( bullJ]Ij(t)l 1j(U( W D 11 ampC W B f~ rimiddotJ $U fT IAJ fjTJ middotmiddot D P 5 ) amp (iii) rf( yen tIUi~JI(Jij frrAJtQJtif~( W D 11 ampC W Big nhit fir IAJ fii

--DP6)

8 rifcJiH41T AE2009 1p )1 27 Ht~XH~r~mrifufjQLjJ~i1)ftJlfftft-U-Jlri81r ~il ~flf AEP-36~2009)

I 0 riF ufJ~H-11 Afi~20 I Ofj= 7F 28 Ht~ X A~ Jiamp~J-Qrir uf6LJrriiLZffl11~1Wiffft (j(Ljrrifillj~mm YEP-32 120 I 0)

12 jf cfrimiddot1t-1TAU~20 12J~ 8F3 31 H 1poundi~l~ rlif(f~Vffrif uf~tLjr ~i1XItlMr1T11flt ft(Ljr~j1g~~Wi YEP-37~2012)

14 j~ 2013 11- 2 I=J 8 Htpound~flmiddot~~frfi~JfRflKruftfLjr~jjXf~8frifiiT11fitfflt4J ~ri 1 f ~~lit FEP-1442013)

( Environmental Permit No FEP-1 2 3642009 D

I~ijlJfuH(g~~ft FEP-12 364 2009 D

f~(EP~ifilf~~~it VEP-44312014)

16 ~ri~~w~~JJlifuf~middot1 - ~foJ~tl~~5i1( EP -3642009C fi 2014lf7 J=l ll R ~ ~1

17 gfoJllit-trAX 20 15 f 10 E3 28 Ht~XA~JL1~~1ft~fofi(fLJ-l~fLzft-ilfrlirfT~ ~fi ff(LJ-lcii11 1 ~~~~t YEP-48520 15)

18 C~i~~R~l~JfioJillt - ~FoJ~tl~hl~ft EP-3642009D j~ 20151 ~ 11 Fl24 Hi ~

19 n~ 20 16 1f 7 J=l 26 H tE~R~trJrAJf~ricif oJ(14JJi Xft-fjfJjrtrtr~f11t-lt lfJ~j ~ ~W~ft FEP-171 20 16)

August 20 16 2016 f 8 Mt 13

Date ( en YK o g) Principal Environmental Protecti Officer HWJ for Director of Environmental Protection

r~~fw-fit1~~wamp ltHJmf~lftf~iiliplusmnff O(WiVc (-(f)

- 4shy

( Environmental Permit No FEP-1 23642009D

J~iflR1 oJ]litf~l]rff FEP-12364i200910

PART B (DESCRIPTION OF DESIGNATED PROJECT) B$ (sect~I~~ 13 89~~)

Hereunder is the description of the designated project mentioned in Part A of this environmental pennit (hereinafter referred to as the Perm it ) fYIJM4~mliJ1 uJaf( Hi4~f unampmiddotmiddot)A ~IfiTJJpoundQilfijtl1JEIfj_J~i rl l~~5ii9J

Title of Designated Proj ect Wan Chai Development Phase 11- Central - Wan Chai Bypass at Wan Chai West m~_[tP~HB~ ~ lli (Contract No HK20 1208)- Tunnel Works

-as part of the middotmiddotc entral-Wan Chai Bypass including its Road Tunnel and Slip Roads (the CWB project) which is covered in the Environmental Permit No EP-3642009 B (This designmed proj ect is hereinafter referred to as middotthe Project)

~1 HU~~LWJ shy I 1 1~~1H~~jfj - i~ i ff19H ((~~~~~lid~ilt H K20 1208) shy l~lli _[fpound

- IltItpound~ ijJ~lH f~Ut(~jiJtf jmiddot fj[ j~jlliJid2lH~lM (C wBIf2Xi F=l )RJ- yensect1 fB middot -J ~~~tfl~f1ilijrofcttl - ~middotroJift~~~m EP-3642009B A~jIJ

c -4-1f1iLt~rw n F1fJLfpoundrq t=n

Nature of Designated Project 1lli_[flfrCi HRj lmiddot1Jl

The Project is a part of the Central-Wan Chai Bypass project (The CWB project will involve construction of a trunk road and its road tunnel more than 800m length between portals)

JltIf~Jfi HJJ 1 l 1 f~i1f S~Ht1I]Erri HA~ - iil~M (C wBJJpoundIC1 HJvfl~~l1- fiU ~1~lliJ_JAu~IL~RmiddotJft~MliM800I~A~f r middotrj[~jill )

Location of Designated Project Wan Chai West harbour-front area Hong Kong 1ilJtJJPtl H A~tttl~ The location ofthe Project is shovn in Fi gures la and lb of this Permit

-~~]~( (pgPj )

_[tJLJ(j HA~tttrlill~ f~fj~ 4~f oft] IN] Iaamp_IN] I b[AJ

Scale and Scope of Designated Project fi=iitLt~PCi 1-J A~tflttHJJitlli[l

The scope of the Project mainly includes bull construction ofa du al three-lane trunk road tunnel of approx imate) 3 1 Om in

length (including the substructure of Middle Ventilation Building) and two slip roads

(part of the CWB project )

Remark s

bull The permanent and temporary reclamation and associated dredging orks re lated to the CWB construction are separately covered by the environmental perm it No EP-35612009 issued to the Civil Engineering and Development Department (CEDD)

I j=~rfi jj A~iuiltj plusmn~hltk bull ~~fll-(lt~J 3 I oj~FI~-=~~ E_(rJ ( f rjj~flli li1~ 1 I )4illiR~ktlJlfigJt11Fi) U

Bt~~~~

(CWB_LtJIJDHH~ - 15f M )

iW1l ijm~i Jfkilifl1tDfltl~ ~k ~o~~MBrttfiJI fECf2lJr5tfi~tr~JtL1poundgt J- _L lhlHi ll~llR-J~lfitif oJmUiFoHtW~lJ11[ EP-3562009)

- 5 shy

( Environmental Permit No FEP-1213642009D

f~fflWF ufafi~~~ilt FEP-1 236412009D

PART C (PERMJT CONDITIONS)

1 General Conditions

11 The Permit Holder and any person Ori--ing on the Project shall comply with a ll condit ions set out in thi s Permit Any non-compliance b) any person may constitute a contravention of the Environmenta l Impact Assessment Ordinance (E IAO) (Cap499) and may become the subject of appropriate action being taken under the Ordinance

12 The Permit Holder shall ensure fu ll compliance with al l legis lation from time to time in force including ithout limi tation to the Ai r Pollution Control Ord inance (Cap 3 11 ) Water Pollution Contro l Ordi nance (Cap 358) Noise Control Ordinance (Cap 400) and Waste Disposa l Ord inance (Cap 3 54) This Perm it does not of itself constitute any ground of defense aga inst any proceed ings instituted under any legislation or imp ly any approva l under an) legislation

13 The Permit Holder shall make copies of this Permit together with a ll documents referred to in this Permit and the documents referred to in Part A of this Permit read ily available at all times for inspect ion by the Di rector or his authori zed officers at all sitesoffice covered by th is Perm it Any reference to the Permit shall incl ude a ll documents referred to in the Permit and also the relevant documents in the Register

I4 The Permit Holder shall give a copy of this Permit to the person(s) in charge of the site(s) and ensure that such person(s) ful ly understa nds all cond it ions and all req uirements incorporated by the Permit The site(s) refers to site(s) of construction of the Project and shall mean the same hereafter

15 The Permit Holder shall d isplay conspicuously a copy of this Permit on the construct ion site(s) at a I I eh icular site entrancesex its or at a convenient location for pub I ic middot s information at a 11 times The Permit Holder shall ensure that the most updated in formation about the Permi t including any amended Permit is di sp layed at such locat ions If the Permit Holder surrenders a part or the whole of this Permit the notice he sends to the Director shall also be displayed at the same locations as the original Permit The suspended varied or cance ll ed Permit shall be removed from disp lay at the construction site(s)

16 The Permit Holder shal l construct the Project in accordance with the project description in Part B of this Perm it (hereafter referred to as the Project)

17 The Permit Holder shal l ensu re that the Project is designed and constructed in accordance ith the middot relevant information and recommenda tions described in the approved CWBampIECL EIA Report (Register No AEIAR-04 1 200 I) the approved WDIIampCWB El A Report (Register No AEIA R- 1252008) the approved CRIII El A Report (Register No AEIAR-040200 I) the app lication documents for environmenta l perm it other relevant documents in the Regi ster and the information or mitigation measures described in this Permit and mitigation measu res to be recommended in submissions that shal l be deposited vi th or approved by the Director as a result of perm it condit ions contained in this Permit and mitigation measures to be recommend ed under on-going surveillance and monitorin g activit ies during a ll stages of the Project Where recommendations referred to in the documents of the Register are not expressly referred to in thi s Permit such recommendations are nevertheless to be implemented unless express) exc luded or impliedly amended in thi s Permit The Project is part of the CWB project

18 Al l deposited subm issions as required under thi s Permit shall be rect ified and

- 6shy

( Environmental Permit No FEP-12364 1200910

f~~~F uJm~5J1t FEP- 12364200910

accordance ith the comments if any made by the Director within one month of the receipt of the Director s comments or otherwise specified by the Director

19 All submiss ions approved by the Director all submissions deposited withou t comments by the Director or al l su bmissions rectified in accordance ith comments by the Director under this Permit shall be construed as part of the permit cond itions described in Pan C of th is Permit Any variation of the submissions shall be approved by the Director in writ ing or as prescribed in the relevant permit cond itions Any non-compliance ith the submissions may constitute a contra ention of the Em ironmental Impact Assessment Ordinance (Cap499) All submissions or any variation of the submiss ions shall be certified by the Environmenta l Team (ET) Leader and verified by the Independen t Environmental Checker (IEC) employed for the CWB project before submitting to the Director under this permit (see note 7)

110 The Perm it Holder shall release all final ized submissions as required under this Permit to the publ ic by depositing copies in the Environmenta l Impact Assessment Ordinance Register Offi ce or in any other places or any internet websites as specified by the Director or by any oth er means as specified by the Director for publi c inspection For this purpose the Permit Holder sha ll provide sufficient copies of the submiss ions

111 All submissions to the Director required under this Permit shall be delivered either in person or by registered ma il to the Environmenta l Im pact Assessment Ord inance Register Office (cu rrently at 27 F Southern Cen tre 130 Hennessy Road Wanchai Hong Kong) Electronic copie of al l fina lized submiss ions required under this Permit shall be prepared in H) per Text Markup Language (HTML) (version 40 or later) and in Portable Document Formflt (PDF version 40 or later) unless othem ise agreed by the Director and slull l be submitted at the same time as the hard copies

2 Special Conditions

2 1-22 fNot Used]

Environmenta l Project Committee (ENPC)

23 To Oe rsee and fac ilitate effecti ve contro l of the cumul ative environmental im pacts arising from potential multiple contracts for the construction of the en ti re Wan Chai Development Phase 11 (WDII ) and Central-Wan Chai Bypass (CWB) (hereafter referred to as the who le Project) the Permit Holder shall take part as a member of Envi ronmental Project Committee (EN PC) set up for the hole proj ect (see note 8)

The ENPC shall make recommendation to enhance the monitoring and aud it of the em iron mental performance of the whole project and other relevflnt nea rby projects on top of requi rements as set out in Conditions 31 to 42 of this Permit or corresponding set out under subsequent Environmental Permits issued for the hole project and other relevant nearby projects (see notes 7 and 8)

24 -28 [Not Used]

Measu1middotes to Mitigate Constn1ction Noise Impact

29

( Environmental Permit No FEP-12364 12009D

f~fflXr wJ ~ft~~~m FEP-1213642009 0

two weeks prior to the commencement of construction of the corresponding component(s) of the Proj ect four hard copies and one electroni c copy of the construction noise management pl an consisting of la) out plan(s) in the scale of I 1000 or other appropriate scal e and explanatory statement(s) showing the noise mitigat ion measures to include the use of movabletemporary noise barriers the use of quiet po~ered mechanical equipments and the adopt ion of multiple-phase construction schedules where appropriate The submission(s) shall be ceriified by the ET Leader and verified by the I EC as conforming to the relevant inform ation and recommendations contained in the apprO ed CWBamplECL El A Report (Register No AEIAR-OJI 200 I) and the WDII ampCWB EIA Report (Register No AEIAR-1252008) before deposit ~ith the Di rector All measures recommended in the fi nalised submission(s) under th is Condition shall be full y and proper) implemented Measures co ered by other pollution control Ord inances hall not be included in this construction noise management plan (see note 8)

2 I 0 -2 13 [Not Used]

Measures to Mitigate Landscape and Visual Impact

214 To reduce the landsca pe and visua l impact during construction stage of the Project the Permit Holder shall implement a series of landscape and isualm itigati on measures The Permit Holder shall at least one month before the commencement of corresponding parts of landscape works of th e Project deposit with the Director four hard cop ies and one electronic copy of landscape plan(s) The landscape plan(s) sha ll show th e design detail s locations implementation programme maintenance and management schedules and drm ings in the sca le of 1 I 000 or other appropriate sca le of the landscape and visual mit igation measures of th e Project Before submission to the Director the landscape plan(s) shall be cer1ified by the ET Leader and verified by the I EC as conforming to the relevant in formation and recommendat ions contained in the apprOed CWBampIECL EIA Report (Regi ter No AEIAR-0412001) and the WDII ampCWB ElA Report (Register No A El A R-1252008) A 11 measures recommended in the fin a I ised su b m ission(s) under th is Condition shall be fu lly and properly implemented (see note 8)

3 Environmental Monitoring and Audit Requirements

31 The EMampA programme shall be implemented in accordance ith the procedures and requirements as set out in the updated EMampA Manual approved for the CWB project (See note 8) An) major changes to the programme shall be justified by the ET Leader and verifi ed by the IEC employed for the CWB project (see note 7) as conforming to the information and requirements contained in the updated EMampA Manua l

32 Samples measurements and necessary remed ial actions shall be taken in accordance with the requirements of the updated EMampA Manual for the CWB project (note 8) by (a) conducting baseline env ironmental monitoring (b) conducting impact monitoring (c) carrying out remedia l actions described in EventAction Plans of the updated EMampA

Manual in accordance with the time frames set out in EventAction Plans or as agreed by the Director in case here specified criteria in the updated EMampA Man ual approved are exceeded and

(d) logging and keeping records of deta ils of (a) to (c) above for a ll parameters within 3 working days of co llection of data or completi on of remedial action(s) for the purpose of preparing and submitting the monthly EMampA Reports and to make avai lab le for inspection

- 8 shy

c Environmental Permit No FEP-12364 middot2009tD

f~JR~fufiiftf~t FEP-1 2 36-+120090

33 [Not Used]

34 Four hard copies and one electronic copy of monthly EMampA Report shall be submitted to the Director Vithin I 0 working days after th e end of each reporting month The EMampA Report s shall inc lude a summary of all non-compl iance (exceedances) of th e envi ronmental quality performance limits (Action and Limit Levels) In compiling this monthly EMampA Report all relevant cumulative const ruction impacts due to concurrent activi ties of the concurrent projects includ ing the Cen tral Reclamation Phase Ill and the Wan Chai Demiddotelopment Phase 11 projects shall be addressed The submiss ions shal l be verified by the IEC emplo)ed for the CWB project (see note 8) Addit ional copies of the submiss ion sha ll be prO ided to the Director upon request by the Director

35 Al l env ironmental monitoring and audit data submitted under this Perm it shal l be true alid and correct

4 Elecflmiddotonic Reporting of EMampA Information

f I To facil itate public inspection of th e Baseline Monitoring Report and regu lar EMampA Reports ia the EIAO Internet Webs ite and at the EJAO Register OITice electronic copies of these Reports shall be prepared in Hyper Text Markup Language (HTML) (version 40 or later) and in Portable Document Format (PDF version -LO or later) unless otherwise agreed by the Director and shall be submitted at the same time as the hardcop ies a described in Condition 34 of th is Permit For the I-ITML version a content page capable of providing h) per ink to each section and sub-section of these Reports shall be included in the beginning of the document H) per inks to all figures drawings and tab les in these Reports shall be provided in the main text from here the respective references are made All graphics in these Reports shall be in interl aced GIF format unless otherwise agreed by the Director The content of the electronic copies of these Reports must be the same as the hardcopies

42 All ellmiddotironmentalmonitori ng data desc ribed in Condition 41 above shall be made a ailablc to the public ia a dedicated eb site to be set up for the CWB project (see note 9) in the shortest practicable time and in no event later than two vveeks after the relevant ell ironmentalmonitoring data are co llected or become ava il able unless othen ise agreed with th e Director

Notes

I This Permit consists of three parts namely PART A (Main Permit) PART B (Descript ion of Designated Project) and PART C (Perm it Conditions) Any person relying on th is perm it should obtain independent legal advice on the lega l implicat ions under the Ordinance and the fo llowing notes are for genera l info rmation only

2 If there is a breach of any conditions of this Permit the Director or his authorized officer ma) ~ ith the consent of the Secretar for the Environment order the cessat ion of associated work unti I the remedia l action is taken in respect of the resultant em ironmental damage and in that case the Permit Holder shall not carry out any associated works without the permiss ion of the Director or his authorized offi cer

3 The Permit Holder ma) apply under Sect ion 13 of th e Ordinance to the Director for a variation of the conditions of this Permit The Permit Holder shall replace the original permit di splayed on the construction site b) the amended perm it

4 A person who assumes the responsibility for the vvhole or a part of the designated project(s) may

- 9shy

c Environmental Permit No FEP- I 2 3642009 D

fftffl~jur-q~~~middot1pound FEP-12364 2009 0

before he assumes responsibilit) of the designated project(s) appl) under Section 12 of the Ordinance to the Di rector for a further ell ironmental permit

5 Under Section 14 of the Ordinance the Director ma~ ith the consent of the ecretary for the Environment suspend var or cancel this Permit The suspended varied or cancelled Permit shall be removed from displa) at the construction site

6 If this Permit is cancelled or surrendered during construction of th e Project another em ironmental permit must be obtained under the Ordinance before the Project could be continued lt is an offence under secti on 26( I) of the Ordinance to construct or operate a designated project li sted in Part I of schedule 2 of the Ordinance v ithout a va lid environmental permit

7 Higlm ays Department (H) D) the Holder of Env ironmental Permit (EP) No EP-3642009 is requ ired under EP-3642009 or any subsequent EP amended b) the Director under the Ord inance (i) to establish an Em ironmental Team (ET)~ hich shall be headed b) an ET Leader (ii) to emplo) an Independent Em ironmental Checker (IEC) (i ii) to liaise ith the Holder of Em ironmcntal Permit No EP-3562009 on to jointly set up an

Environmental Project Committee (EN PC)~ and (i) to liai se with the Holder of Em ironmental Permit No EP-3562009 to jointly set up a

Communit) Liaison Group (CLG) for the CWB project

8 H) D the Holder of EP-3642009 is required under EP-3642009 or any subsequent EP amend ed by the Director under the Ordinance (i) to notify the Director in Hiting the commencement date ofconstruction of the CWB project (i i) to notify the Director the date of sett ing up the EN PC (iii) to notif) the Director the date of setting up the CLG (iv) to submit to the Director for approva l the updated Environmental Monitoring and Audit

Manual (updated EMampA Manual) () to inform the Director in riling the management organ ization of the mai n construction

companies andor any form of joint entures associated i th the construction of the CWB project

( i) to deposit ith the Director a deta iled works schedu le and locat ion plans ( ii) to deposit v ith the Director a construction noise management plan ( iii) to deposit~ ith the Director an operationa l air qual it management plan (ix) to deposit middot ith the Director landscape plan(s) (x) to depos it ~ ith the Director an addit ional mitigation plan for Slip Road 8 (x i) to submit to the Director the Baseline Monitoring Report and (-ii) to submit to the Director the month ) EMampA Reports for the CWB project

9 I I) D the Holder of Env ironmenta l Permit EP-3642009 is required under EP-3642009 or any subsequent EP amended by the Director under the Ordinance (i) to implement the proposed construction Orks of CWB including its Road Tunne l and Slip

Roads ventilation buildings and ent shaft(s) at the location sho n in Figure I of EP-36-l2009 together ith the relevant environmental mitigation measures and

(ii) to set up a dedicated eb site and notify the Director in writing the Internet address here the environmental monitoring and project data is to be placed

for the CWB project

I0 Any person vho constructs the Project contrar middot to the conditions in the Permit and is convicted of an offen ce under the Ordinance is liab le shy

( Environmemal Permit No FEP- 12364 12009D

fRmH uJJff~fifJfE FEP-123642009D

(i) on a first conviction on indictment to a fine of$ 2 million and to imprisonment for 6 months

(ii) on a second or subsequen t conviction on ind ictment to a fi ne of $ 5 mil lion and to imprisonment for years

(iii) on a first summary conviction to a fine at leve l 6 and to imprisonment for 6 months

(iv) on a second or subsequent summary conviction to a fi ne of$1 mi llion and to imprisonment for 1 year and

(v) in any case here the offence is of a contin uing nature the court or magistrate may impose a fine of$ 1 0000 fo r each day on v hich he is sat isfied the offence continued

1 I The Permit Holder may appea l aga inst any condit ion of this Permit under Section I 7 of the Ord inance i thi n 30 days of receipt of this Permit

12 The Note are for general reference only and that the Perm it Holder should refer to the EIA Ord inance for deta ils and seek independent legal advice

Environmental Permit No FEP- 12136412009D IlftilrMT-Zfc C~ I 6 I 0 I~JYliJT nJ ~v~IH ~JIIt FEP-12 3 4 2 09 D

- 11 shy

( Environmental Permit No FEP- 123642009 D

J~Jff~f oJdfr~f-6~ FEP- 1236-12009 bull0

Table la

[Not used]

Table l b Exha ust Related Design Criteria of the Ccnt1middotal Ventilation Building and t he East Ventilation Building and its Vent Shaft (based on Table 311 of the WDIIampCWB EIA Report (Registe1middot No AElAR-1252008)

Minimum mid-dischabullmiddotge Cross-sectional Exit velocity Exhaust

height (meter above (m s1

)area of stack (m2) direction

ground)

Vertica l Central Venti lation 219 8 175

Bu ildi ng (CVB)

Incl ined 45 Vent shaft of the

degree up ard East Venti lation

94 8 1625 (discharge Bui lding

tO~ ards sea (EVB)

direction)

Notes This Table shall be read in conjunction ith Condition 213 and Figure I of this Perm it The vent shaft of CVB i11 be incorporated ~ ith in the CVB

The vent shaft of EVB il l be separated from the EVB and located at the eastern break at er of the Cause~ ay Bay T) phoon Shelter

- 12shy

--shy N

COVERED BY APPROVED CWB amp IECL EIA REPIJH E IAO REGISTER NO AEIAR - ~12001 I

[

CENTRAL RECL PHASE ~-

~ 11 middott l l J

-shy -~ __r _______ __--shy- I

I

reg +

I fmiddotll

71 lt1

I

~ I

111~Srt ~ ~

Proj ect Title Wan C hai Development Phase 11 - Central-Wan C hai 13y1Jass at W~n C hai West (Contract No 11 K20 1208)- Tunnel Works

I~lfg glf ffr~famp~ -W-J- cfJtl~tT-~lli - ~ffflpoundi~ji (fltlt~J~ 11 K20 1208) ~ill I fpound

Environmental Permil No FEP 123642009D

[ ~

Figure la Location of the Project [sect la Ifi~Fifrr~

Bnuudu ofStmh 1r~a tl i 1J Itiioii~l

F cll l lf Rcclamatt OII hpound JnIIJJ

Tnm~ Rood 111 lunncl ]~yJ

t lti oadc Inn1~ Rltbullad amp iltp Road 1111111 bull bull wgtbull tl~~middot

~hp RuaJ on I leatccl 1ruuurc 1r~middot1Yn

t Iht li lUIC 11 plqlUCcl ha--rd (111 II~UI( 1 ell Jl plit Jfl(lll hlf h ulhcr l m trnnmcn1c11Pel ml c pp lliIIU)Il ~(l 11 ~- 1 71201h))

( f[~flJtf it~bullt fJi(Jl tq bull)1 ( ftt middot l-J 11 1-17 I02U ih) Jf la 11middot~ )EI51mtrrcrm~~~ FpoundP- 12J64t2oo9 o

shy

shy

1

Legend lffiiIJ

1 middot~ SI n BOUNDARY i-

VICTO~lt IIARIICUR

GDIJ1 OJlCl100 COl GC0412~7Cl1001C02

Project Tit le Wan C lwi Development Phase 11- Central-Wan Chai Bypass at Wan C hai West Figubullmiddote 1 b General Layout of the Pbullmiddotojcct (Contract No HY201208)- T unnel Worllts 1MJ 1 b I~~g 111iJFiJ~I~Jfisect~flJ ~fr~fm~=Wi - cppound95air~ili - ~ffgsectt~ (~~g~ljf HK20 1208)shy~iliifM

1Tillbull filHC tl~ prepared h I H-171 110161)1C(f ltm lrBurc IIK1l Appluauon h1r lunher Fmmlnmelllal l~rmu ( pphcat rcm rn Environmental Permit No FEP- 1 236~20090 t11 bullfll~ ppld(Jllcl middotJ~J I 1bullbull1 1 W n I-1 12CI16)il h illt~l l$1-IJlffPJID~liR FEP- 123642009D

Page 6: :Jn - EPD · 2016. 12. 14. · referenced ( 19) in Ax(-1) to EP2/H4 'C/09 11. 7. Environmental Permit Issued - Permit No.: EP-356/2009 issued to Civil Engineering and Development

( Environmental Permit No FEP-1 2 3642009 D

I~ijlJfuH(g~~ft FEP-12 364 2009 D

f~(EP~ifilf~~~it VEP-44312014)

16 ~ri~~w~~JJlifuf~middot1 - ~foJ~tl~~5i1( EP -3642009C fi 2014lf7 J=l ll R ~ ~1

17 gfoJllit-trAX 20 15 f 10 E3 28 Ht~XA~JL1~~1ft~fofi(fLJ-l~fLzft-ilfrlirfT~ ~fi ff(LJ-lcii11 1 ~~~~t YEP-48520 15)

18 C~i~~R~l~JfioJillt - ~FoJ~tl~hl~ft EP-3642009D j~ 20151 ~ 11 Fl24 Hi ~

19 n~ 20 16 1f 7 J=l 26 H tE~R~trJrAJf~ricif oJ(14JJi Xft-fjfJjrtrtr~f11t-lt lfJ~j ~ ~W~ft FEP-171 20 16)

August 20 16 2016 f 8 Mt 13

Date ( en YK o g) Principal Environmental Protecti Officer HWJ for Director of Environmental Protection

r~~fw-fit1~~wamp ltHJmf~lftf~iiliplusmnff O(WiVc (-(f)

- 4shy

( Environmental Permit No FEP-1 23642009D

J~iflR1 oJ]litf~l]rff FEP-12364i200910

PART B (DESCRIPTION OF DESIGNATED PROJECT) B$ (sect~I~~ 13 89~~)

Hereunder is the description of the designated project mentioned in Part A of this environmental pennit (hereinafter referred to as the Perm it ) fYIJM4~mliJ1 uJaf( Hi4~f unampmiddotmiddot)A ~IfiTJJpoundQilfijtl1JEIfj_J~i rl l~~5ii9J

Title of Designated Proj ect Wan Chai Development Phase 11- Central - Wan Chai Bypass at Wan Chai West m~_[tP~HB~ ~ lli (Contract No HK20 1208)- Tunnel Works

-as part of the middotmiddotc entral-Wan Chai Bypass including its Road Tunnel and Slip Roads (the CWB project) which is covered in the Environmental Permit No EP-3642009 B (This designmed proj ect is hereinafter referred to as middotthe Project)

~1 HU~~LWJ shy I 1 1~~1H~~jfj - i~ i ff19H ((~~~~~lid~ilt H K20 1208) shy l~lli _[fpound

- IltItpound~ ijJ~lH f~Ut(~jiJtf jmiddot fj[ j~jlliJid2lH~lM (C wBIf2Xi F=l )RJ- yensect1 fB middot -J ~~~tfl~f1ilijrofcttl - ~middotroJift~~~m EP-3642009B A~jIJ

c -4-1f1iLt~rw n F1fJLfpoundrq t=n

Nature of Designated Project 1lli_[flfrCi HRj lmiddot1Jl

The Project is a part of the Central-Wan Chai Bypass project (The CWB project will involve construction of a trunk road and its road tunnel more than 800m length between portals)

JltIf~Jfi HJJ 1 l 1 f~i1f S~Ht1I]Erri HA~ - iil~M (C wBJJpoundIC1 HJvfl~~l1- fiU ~1~lliJ_JAu~IL~RmiddotJft~MliM800I~A~f r middotrj[~jill )

Location of Designated Project Wan Chai West harbour-front area Hong Kong 1ilJtJJPtl H A~tttl~ The location ofthe Project is shovn in Fi gures la and lb of this Permit

-~~]~( (pgPj )

_[tJLJ(j HA~tttrlill~ f~fj~ 4~f oft] IN] Iaamp_IN] I b[AJ

Scale and Scope of Designated Project fi=iitLt~PCi 1-J A~tflttHJJitlli[l

The scope of the Project mainly includes bull construction ofa du al three-lane trunk road tunnel of approx imate) 3 1 Om in

length (including the substructure of Middle Ventilation Building) and two slip roads

(part of the CWB project )

Remark s

bull The permanent and temporary reclamation and associated dredging orks re lated to the CWB construction are separately covered by the environmental perm it No EP-35612009 issued to the Civil Engineering and Development Department (CEDD)

I j=~rfi jj A~iuiltj plusmn~hltk bull ~~fll-(lt~J 3 I oj~FI~-=~~ E_(rJ ( f rjj~flli li1~ 1 I )4illiR~ktlJlfigJt11Fi) U

Bt~~~~

(CWB_LtJIJDHH~ - 15f M )

iW1l ijm~i Jfkilifl1tDfltl~ ~k ~o~~MBrttfiJI fECf2lJr5tfi~tr~JtL1poundgt J- _L lhlHi ll~llR-J~lfitif oJmUiFoHtW~lJ11[ EP-3562009)

- 5 shy

( Environmental Permit No FEP-1213642009D

f~fflWF ufafi~~~ilt FEP-1 236412009D

PART C (PERMJT CONDITIONS)

1 General Conditions

11 The Permit Holder and any person Ori--ing on the Project shall comply with a ll condit ions set out in thi s Permit Any non-compliance b) any person may constitute a contravention of the Environmenta l Impact Assessment Ordinance (E IAO) (Cap499) and may become the subject of appropriate action being taken under the Ordinance

12 The Permit Holder shall ensure fu ll compliance with al l legis lation from time to time in force including ithout limi tation to the Ai r Pollution Control Ord inance (Cap 3 11 ) Water Pollution Contro l Ordi nance (Cap 358) Noise Control Ordinance (Cap 400) and Waste Disposa l Ord inance (Cap 3 54) This Perm it does not of itself constitute any ground of defense aga inst any proceed ings instituted under any legislation or imp ly any approva l under an) legislation

13 The Permit Holder shall make copies of this Permit together with a ll documents referred to in this Permit and the documents referred to in Part A of this Permit read ily available at all times for inspect ion by the Di rector or his authori zed officers at all sitesoffice covered by th is Perm it Any reference to the Permit shall incl ude a ll documents referred to in the Permit and also the relevant documents in the Register

I4 The Permit Holder shall give a copy of this Permit to the person(s) in charge of the site(s) and ensure that such person(s) ful ly understa nds all cond it ions and all req uirements incorporated by the Permit The site(s) refers to site(s) of construction of the Project and shall mean the same hereafter

15 The Permit Holder shall d isplay conspicuously a copy of this Permit on the construct ion site(s) at a I I eh icular site entrancesex its or at a convenient location for pub I ic middot s information at a 11 times The Permit Holder shall ensure that the most updated in formation about the Permi t including any amended Permit is di sp layed at such locat ions If the Permit Holder surrenders a part or the whole of this Permit the notice he sends to the Director shall also be displayed at the same locations as the original Permit The suspended varied or cance ll ed Permit shall be removed from disp lay at the construction site(s)

16 The Permit Holder shal l construct the Project in accordance with the project description in Part B of this Perm it (hereafter referred to as the Project)

17 The Permit Holder shal l ensu re that the Project is designed and constructed in accordance ith the middot relevant information and recommenda tions described in the approved CWBampIECL EIA Report (Register No AEIAR-04 1 200 I) the approved WDIIampCWB El A Report (Register No AEIA R- 1252008) the approved CRIII El A Report (Register No AEIAR-040200 I) the app lication documents for environmenta l perm it other relevant documents in the Regi ster and the information or mitigation measures described in this Permit and mitigation measu res to be recommended in submissions that shal l be deposited vi th or approved by the Director as a result of perm it condit ions contained in this Permit and mitigation measures to be recommend ed under on-going surveillance and monitorin g activit ies during a ll stages of the Project Where recommendations referred to in the documents of the Register are not expressly referred to in thi s Permit such recommendations are nevertheless to be implemented unless express) exc luded or impliedly amended in thi s Permit The Project is part of the CWB project

18 Al l deposited subm issions as required under thi s Permit shall be rect ified and

- 6shy

( Environmental Permit No FEP-12364 1200910

f~~~F uJm~5J1t FEP- 12364200910

accordance ith the comments if any made by the Director within one month of the receipt of the Director s comments or otherwise specified by the Director

19 All submiss ions approved by the Director all submissions deposited withou t comments by the Director or al l su bmissions rectified in accordance ith comments by the Director under this Permit shall be construed as part of the permit cond itions described in Pan C of th is Permit Any variation of the submissions shall be approved by the Director in writ ing or as prescribed in the relevant permit cond itions Any non-compliance ith the submissions may constitute a contra ention of the Em ironmental Impact Assessment Ordinance (Cap499) All submissions or any variation of the submiss ions shall be certified by the Environmenta l Team (ET) Leader and verified by the Independen t Environmental Checker (IEC) employed for the CWB project before submitting to the Director under this permit (see note 7)

110 The Perm it Holder shall release all final ized submissions as required under this Permit to the publ ic by depositing copies in the Environmenta l Impact Assessment Ordinance Register Offi ce or in any other places or any internet websites as specified by the Director or by any oth er means as specified by the Director for publi c inspection For this purpose the Permit Holder sha ll provide sufficient copies of the submiss ions

111 All submissions to the Director required under this Permit shall be delivered either in person or by registered ma il to the Environmenta l Im pact Assessment Ord inance Register Office (cu rrently at 27 F Southern Cen tre 130 Hennessy Road Wanchai Hong Kong) Electronic copie of al l fina lized submiss ions required under this Permit shall be prepared in H) per Text Markup Language (HTML) (version 40 or later) and in Portable Document Formflt (PDF version 40 or later) unless othem ise agreed by the Director and slull l be submitted at the same time as the hard copies

2 Special Conditions

2 1-22 fNot Used]

Environmenta l Project Committee (ENPC)

23 To Oe rsee and fac ilitate effecti ve contro l of the cumul ative environmental im pacts arising from potential multiple contracts for the construction of the en ti re Wan Chai Development Phase 11 (WDII ) and Central-Wan Chai Bypass (CWB) (hereafter referred to as the who le Project) the Permit Holder shall take part as a member of Envi ronmental Project Committee (EN PC) set up for the hole proj ect (see note 8)

The ENPC shall make recommendation to enhance the monitoring and aud it of the em iron mental performance of the whole project and other relevflnt nea rby projects on top of requi rements as set out in Conditions 31 to 42 of this Permit or corresponding set out under subsequent Environmental Permits issued for the hole project and other relevant nearby projects (see notes 7 and 8)

24 -28 [Not Used]

Measu1middotes to Mitigate Constn1ction Noise Impact

29

( Environmental Permit No FEP-12364 12009D

f~fflXr wJ ~ft~~~m FEP-1213642009 0

two weeks prior to the commencement of construction of the corresponding component(s) of the Proj ect four hard copies and one electroni c copy of the construction noise management pl an consisting of la) out plan(s) in the scale of I 1000 or other appropriate scal e and explanatory statement(s) showing the noise mitigat ion measures to include the use of movabletemporary noise barriers the use of quiet po~ered mechanical equipments and the adopt ion of multiple-phase construction schedules where appropriate The submission(s) shall be ceriified by the ET Leader and verified by the I EC as conforming to the relevant inform ation and recommendations contained in the apprO ed CWBamplECL El A Report (Register No AEIAR-OJI 200 I) and the WDII ampCWB EIA Report (Register No AEIAR-1252008) before deposit ~ith the Di rector All measures recommended in the fi nalised submission(s) under th is Condition shall be full y and proper) implemented Measures co ered by other pollution control Ord inances hall not be included in this construction noise management plan (see note 8)

2 I 0 -2 13 [Not Used]

Measures to Mitigate Landscape and Visual Impact

214 To reduce the landsca pe and visua l impact during construction stage of the Project the Permit Holder shall implement a series of landscape and isualm itigati on measures The Permit Holder shall at least one month before the commencement of corresponding parts of landscape works of th e Project deposit with the Director four hard cop ies and one electronic copy of landscape plan(s) The landscape plan(s) sha ll show th e design detail s locations implementation programme maintenance and management schedules and drm ings in the sca le of 1 I 000 or other appropriate sca le of the landscape and visual mit igation measures of th e Project Before submission to the Director the landscape plan(s) shall be cer1ified by the ET Leader and verified by the I EC as conforming to the relevant in formation and recommendat ions contained in the apprOed CWBampIECL EIA Report (Regi ter No AEIAR-0412001) and the WDII ampCWB ElA Report (Register No A El A R-1252008) A 11 measures recommended in the fin a I ised su b m ission(s) under th is Condition shall be fu lly and properly implemented (see note 8)

3 Environmental Monitoring and Audit Requirements

31 The EMampA programme shall be implemented in accordance ith the procedures and requirements as set out in the updated EMampA Manual approved for the CWB project (See note 8) An) major changes to the programme shall be justified by the ET Leader and verifi ed by the IEC employed for the CWB project (see note 7) as conforming to the information and requirements contained in the updated EMampA Manua l

32 Samples measurements and necessary remed ial actions shall be taken in accordance with the requirements of the updated EMampA Manual for the CWB project (note 8) by (a) conducting baseline env ironmental monitoring (b) conducting impact monitoring (c) carrying out remedia l actions described in EventAction Plans of the updated EMampA

Manual in accordance with the time frames set out in EventAction Plans or as agreed by the Director in case here specified criteria in the updated EMampA Man ual approved are exceeded and

(d) logging and keeping records of deta ils of (a) to (c) above for a ll parameters within 3 working days of co llection of data or completi on of remedial action(s) for the purpose of preparing and submitting the monthly EMampA Reports and to make avai lab le for inspection

- 8 shy

c Environmental Permit No FEP-12364 middot2009tD

f~JR~fufiiftf~t FEP-1 2 36-+120090

33 [Not Used]

34 Four hard copies and one electronic copy of monthly EMampA Report shall be submitted to the Director Vithin I 0 working days after th e end of each reporting month The EMampA Report s shall inc lude a summary of all non-compl iance (exceedances) of th e envi ronmental quality performance limits (Action and Limit Levels) In compiling this monthly EMampA Report all relevant cumulative const ruction impacts due to concurrent activi ties of the concurrent projects includ ing the Cen tral Reclamation Phase Ill and the Wan Chai Demiddotelopment Phase 11 projects shall be addressed The submiss ions shal l be verified by the IEC emplo)ed for the CWB project (see note 8) Addit ional copies of the submiss ion sha ll be prO ided to the Director upon request by the Director

35 Al l env ironmental monitoring and audit data submitted under this Perm it shal l be true alid and correct

4 Elecflmiddotonic Reporting of EMampA Information

f I To facil itate public inspection of th e Baseline Monitoring Report and regu lar EMampA Reports ia the EIAO Internet Webs ite and at the EJAO Register OITice electronic copies of these Reports shall be prepared in Hyper Text Markup Language (HTML) (version 40 or later) and in Portable Document Format (PDF version -LO or later) unless otherwise agreed by the Director and shall be submitted at the same time as the hardcop ies a described in Condition 34 of th is Permit For the I-ITML version a content page capable of providing h) per ink to each section and sub-section of these Reports shall be included in the beginning of the document H) per inks to all figures drawings and tab les in these Reports shall be provided in the main text from here the respective references are made All graphics in these Reports shall be in interl aced GIF format unless otherwise agreed by the Director The content of the electronic copies of these Reports must be the same as the hardcopies

42 All ellmiddotironmentalmonitori ng data desc ribed in Condition 41 above shall be made a ailablc to the public ia a dedicated eb site to be set up for the CWB project (see note 9) in the shortest practicable time and in no event later than two vveeks after the relevant ell ironmentalmonitoring data are co llected or become ava il able unless othen ise agreed with th e Director

Notes

I This Permit consists of three parts namely PART A (Main Permit) PART B (Descript ion of Designated Project) and PART C (Perm it Conditions) Any person relying on th is perm it should obtain independent legal advice on the lega l implicat ions under the Ordinance and the fo llowing notes are for genera l info rmation only

2 If there is a breach of any conditions of this Permit the Director or his authorized officer ma) ~ ith the consent of the Secretar for the Environment order the cessat ion of associated work unti I the remedia l action is taken in respect of the resultant em ironmental damage and in that case the Permit Holder shall not carry out any associated works without the permiss ion of the Director or his authorized offi cer

3 The Permit Holder ma) apply under Sect ion 13 of th e Ordinance to the Director for a variation of the conditions of this Permit The Permit Holder shall replace the original permit di splayed on the construction site b) the amended perm it

4 A person who assumes the responsibility for the vvhole or a part of the designated project(s) may

- 9shy

c Environmental Permit No FEP- I 2 3642009 D

fftffl~jur-q~~~middot1pound FEP-12364 2009 0

before he assumes responsibilit) of the designated project(s) appl) under Section 12 of the Ordinance to the Di rector for a further ell ironmental permit

5 Under Section 14 of the Ordinance the Director ma~ ith the consent of the ecretary for the Environment suspend var or cancel this Permit The suspended varied or cancelled Permit shall be removed from displa) at the construction site

6 If this Permit is cancelled or surrendered during construction of th e Project another em ironmental permit must be obtained under the Ordinance before the Project could be continued lt is an offence under secti on 26( I) of the Ordinance to construct or operate a designated project li sted in Part I of schedule 2 of the Ordinance v ithout a va lid environmental permit

7 Higlm ays Department (H) D) the Holder of Env ironmental Permit (EP) No EP-3642009 is requ ired under EP-3642009 or any subsequent EP amended b) the Director under the Ord inance (i) to establish an Em ironmental Team (ET)~ hich shall be headed b) an ET Leader (ii) to emplo) an Independent Em ironmental Checker (IEC) (i ii) to liaise ith the Holder of Em ironmcntal Permit No EP-3562009 on to jointly set up an

Environmental Project Committee (EN PC)~ and (i) to liai se with the Holder of Em ironmental Permit No EP-3562009 to jointly set up a

Communit) Liaison Group (CLG) for the CWB project

8 H) D the Holder of EP-3642009 is required under EP-3642009 or any subsequent EP amend ed by the Director under the Ordinance (i) to notify the Director in Hiting the commencement date ofconstruction of the CWB project (i i) to notify the Director the date of sett ing up the EN PC (iii) to notif) the Director the date of setting up the CLG (iv) to submit to the Director for approva l the updated Environmental Monitoring and Audit

Manual (updated EMampA Manual) () to inform the Director in riling the management organ ization of the mai n construction

companies andor any form of joint entures associated i th the construction of the CWB project

( i) to deposit ith the Director a deta iled works schedu le and locat ion plans ( ii) to deposit v ith the Director a construction noise management plan ( iii) to deposit~ ith the Director an operationa l air qual it management plan (ix) to deposit middot ith the Director landscape plan(s) (x) to depos it ~ ith the Director an addit ional mitigation plan for Slip Road 8 (x i) to submit to the Director the Baseline Monitoring Report and (-ii) to submit to the Director the month ) EMampA Reports for the CWB project

9 I I) D the Holder of Env ironmenta l Permit EP-3642009 is required under EP-3642009 or any subsequent EP amended by the Director under the Ordinance (i) to implement the proposed construction Orks of CWB including its Road Tunne l and Slip

Roads ventilation buildings and ent shaft(s) at the location sho n in Figure I of EP-36-l2009 together ith the relevant environmental mitigation measures and

(ii) to set up a dedicated eb site and notify the Director in writing the Internet address here the environmental monitoring and project data is to be placed

for the CWB project

I0 Any person vho constructs the Project contrar middot to the conditions in the Permit and is convicted of an offen ce under the Ordinance is liab le shy

( Environmemal Permit No FEP- 12364 12009D

fRmH uJJff~fifJfE FEP-123642009D

(i) on a first conviction on indictment to a fine of$ 2 million and to imprisonment for 6 months

(ii) on a second or subsequen t conviction on ind ictment to a fi ne of $ 5 mil lion and to imprisonment for years

(iii) on a first summary conviction to a fine at leve l 6 and to imprisonment for 6 months

(iv) on a second or subsequent summary conviction to a fi ne of$1 mi llion and to imprisonment for 1 year and

(v) in any case here the offence is of a contin uing nature the court or magistrate may impose a fine of$ 1 0000 fo r each day on v hich he is sat isfied the offence continued

1 I The Permit Holder may appea l aga inst any condit ion of this Permit under Section I 7 of the Ord inance i thi n 30 days of receipt of this Permit

12 The Note are for general reference only and that the Perm it Holder should refer to the EIA Ord inance for deta ils and seek independent legal advice

Environmental Permit No FEP- 12136412009D IlftilrMT-Zfc C~ I 6 I 0 I~JYliJT nJ ~v~IH ~JIIt FEP-12 3 4 2 09 D

- 11 shy

( Environmental Permit No FEP- 123642009 D

J~Jff~f oJdfr~f-6~ FEP- 1236-12009 bull0

Table la

[Not used]

Table l b Exha ust Related Design Criteria of the Ccnt1middotal Ventilation Building and t he East Ventilation Building and its Vent Shaft (based on Table 311 of the WDIIampCWB EIA Report (Registe1middot No AElAR-1252008)

Minimum mid-dischabullmiddotge Cross-sectional Exit velocity Exhaust

height (meter above (m s1

)area of stack (m2) direction

ground)

Vertica l Central Venti lation 219 8 175

Bu ildi ng (CVB)

Incl ined 45 Vent shaft of the

degree up ard East Venti lation

94 8 1625 (discharge Bui lding

tO~ ards sea (EVB)

direction)

Notes This Table shall be read in conjunction ith Condition 213 and Figure I of this Perm it The vent shaft of CVB i11 be incorporated ~ ith in the CVB

The vent shaft of EVB il l be separated from the EVB and located at the eastern break at er of the Cause~ ay Bay T) phoon Shelter

- 12shy

--shy N

COVERED BY APPROVED CWB amp IECL EIA REPIJH E IAO REGISTER NO AEIAR - ~12001 I

[

CENTRAL RECL PHASE ~-

~ 11 middott l l J

-shy -~ __r _______ __--shy- I

I

reg +

I fmiddotll

71 lt1

I

~ I

111~Srt ~ ~

Proj ect Title Wan C hai Development Phase 11 - Central-Wan C hai 13y1Jass at W~n C hai West (Contract No 11 K20 1208)- Tunnel Works

I~lfg glf ffr~famp~ -W-J- cfJtl~tT-~lli - ~ffflpoundi~ji (fltlt~J~ 11 K20 1208) ~ill I fpound

Environmental Permil No FEP 123642009D

[ ~

Figure la Location of the Project [sect la Ifi~Fifrr~

Bnuudu ofStmh 1r~a tl i 1J Itiioii~l

F cll l lf Rcclamatt OII hpound JnIIJJ

Tnm~ Rood 111 lunncl ]~yJ

t lti oadc Inn1~ Rltbullad amp iltp Road 1111111 bull bull wgtbull tl~~middot

~hp RuaJ on I leatccl 1ruuurc 1r~middot1Yn

t Iht li lUIC 11 plqlUCcl ha--rd (111 II~UI( 1 ell Jl plit Jfl(lll hlf h ulhcr l m trnnmcn1c11Pel ml c pp lliIIU)Il ~(l 11 ~- 1 71201h))

( f[~flJtf it~bullt fJi(Jl tq bull)1 ( ftt middot l-J 11 1-17 I02U ih) Jf la 11middot~ )EI51mtrrcrm~~~ FpoundP- 12J64t2oo9 o

shy

shy

1

Legend lffiiIJ

1 middot~ SI n BOUNDARY i-

VICTO~lt IIARIICUR

GDIJ1 OJlCl100 COl GC0412~7Cl1001C02

Project Tit le Wan C lwi Development Phase 11- Central-Wan Chai Bypass at Wan C hai West Figubullmiddote 1 b General Layout of the Pbullmiddotojcct (Contract No HY201208)- T unnel Worllts 1MJ 1 b I~~g 111iJFiJ~I~Jfisect~flJ ~fr~fm~=Wi - cppound95air~ili - ~ffgsectt~ (~~g~ljf HK20 1208)shy~iliifM

1Tillbull filHC tl~ prepared h I H-171 110161)1C(f ltm lrBurc IIK1l Appluauon h1r lunher Fmmlnmelllal l~rmu ( pphcat rcm rn Environmental Permit No FEP- 1 236~20090 t11 bullfll~ ppld(Jllcl middotJ~J I 1bullbull1 1 W n I-1 12CI16)il h illt~l l$1-IJlffPJID~liR FEP- 123642009D

Page 7: :Jn - EPD · 2016. 12. 14. · referenced ( 19) in Ax(-1) to EP2/H4 'C/09 11. 7. Environmental Permit Issued - Permit No.: EP-356/2009 issued to Civil Engineering and Development

( Environmental Permit No FEP-1 23642009D

J~iflR1 oJ]litf~l]rff FEP-12364i200910

PART B (DESCRIPTION OF DESIGNATED PROJECT) B$ (sect~I~~ 13 89~~)

Hereunder is the description of the designated project mentioned in Part A of this environmental pennit (hereinafter referred to as the Perm it ) fYIJM4~mliJ1 uJaf( Hi4~f unampmiddotmiddot)A ~IfiTJJpoundQilfijtl1JEIfj_J~i rl l~~5ii9J

Title of Designated Proj ect Wan Chai Development Phase 11- Central - Wan Chai Bypass at Wan Chai West m~_[tP~HB~ ~ lli (Contract No HK20 1208)- Tunnel Works

-as part of the middotmiddotc entral-Wan Chai Bypass including its Road Tunnel and Slip Roads (the CWB project) which is covered in the Environmental Permit No EP-3642009 B (This designmed proj ect is hereinafter referred to as middotthe Project)

~1 HU~~LWJ shy I 1 1~~1H~~jfj - i~ i ff19H ((~~~~~lid~ilt H K20 1208) shy l~lli _[fpound

- IltItpound~ ijJ~lH f~Ut(~jiJtf jmiddot fj[ j~jlliJid2lH~lM (C wBIf2Xi F=l )RJ- yensect1 fB middot -J ~~~tfl~f1ilijrofcttl - ~middotroJift~~~m EP-3642009B A~jIJ

c -4-1f1iLt~rw n F1fJLfpoundrq t=n

Nature of Designated Project 1lli_[flfrCi HRj lmiddot1Jl

The Project is a part of the Central-Wan Chai Bypass project (The CWB project will involve construction of a trunk road and its road tunnel more than 800m length between portals)

JltIf~Jfi HJJ 1 l 1 f~i1f S~Ht1I]Erri HA~ - iil~M (C wBJJpoundIC1 HJvfl~~l1- fiU ~1~lliJ_JAu~IL~RmiddotJft~MliM800I~A~f r middotrj[~jill )

Location of Designated Project Wan Chai West harbour-front area Hong Kong 1ilJtJJPtl H A~tttl~ The location ofthe Project is shovn in Fi gures la and lb of this Permit

-~~]~( (pgPj )

_[tJLJ(j HA~tttrlill~ f~fj~ 4~f oft] IN] Iaamp_IN] I b[AJ

Scale and Scope of Designated Project fi=iitLt~PCi 1-J A~tflttHJJitlli[l

The scope of the Project mainly includes bull construction ofa du al three-lane trunk road tunnel of approx imate) 3 1 Om in

length (including the substructure of Middle Ventilation Building) and two slip roads

(part of the CWB project )

Remark s

bull The permanent and temporary reclamation and associated dredging orks re lated to the CWB construction are separately covered by the environmental perm it No EP-35612009 issued to the Civil Engineering and Development Department (CEDD)

I j=~rfi jj A~iuiltj plusmn~hltk bull ~~fll-(lt~J 3 I oj~FI~-=~~ E_(rJ ( f rjj~flli li1~ 1 I )4illiR~ktlJlfigJt11Fi) U

Bt~~~~

(CWB_LtJIJDHH~ - 15f M )

iW1l ijm~i Jfkilifl1tDfltl~ ~k ~o~~MBrttfiJI fECf2lJr5tfi~tr~JtL1poundgt J- _L lhlHi ll~llR-J~lfitif oJmUiFoHtW~lJ11[ EP-3562009)

- 5 shy

( Environmental Permit No FEP-1213642009D

f~fflWF ufafi~~~ilt FEP-1 236412009D

PART C (PERMJT CONDITIONS)

1 General Conditions

11 The Permit Holder and any person Ori--ing on the Project shall comply with a ll condit ions set out in thi s Permit Any non-compliance b) any person may constitute a contravention of the Environmenta l Impact Assessment Ordinance (E IAO) (Cap499) and may become the subject of appropriate action being taken under the Ordinance

12 The Permit Holder shall ensure fu ll compliance with al l legis lation from time to time in force including ithout limi tation to the Ai r Pollution Control Ord inance (Cap 3 11 ) Water Pollution Contro l Ordi nance (Cap 358) Noise Control Ordinance (Cap 400) and Waste Disposa l Ord inance (Cap 3 54) This Perm it does not of itself constitute any ground of defense aga inst any proceed ings instituted under any legislation or imp ly any approva l under an) legislation

13 The Permit Holder shall make copies of this Permit together with a ll documents referred to in this Permit and the documents referred to in Part A of this Permit read ily available at all times for inspect ion by the Di rector or his authori zed officers at all sitesoffice covered by th is Perm it Any reference to the Permit shall incl ude a ll documents referred to in the Permit and also the relevant documents in the Register

I4 The Permit Holder shall give a copy of this Permit to the person(s) in charge of the site(s) and ensure that such person(s) ful ly understa nds all cond it ions and all req uirements incorporated by the Permit The site(s) refers to site(s) of construction of the Project and shall mean the same hereafter

15 The Permit Holder shall d isplay conspicuously a copy of this Permit on the construct ion site(s) at a I I eh icular site entrancesex its or at a convenient location for pub I ic middot s information at a 11 times The Permit Holder shall ensure that the most updated in formation about the Permi t including any amended Permit is di sp layed at such locat ions If the Permit Holder surrenders a part or the whole of this Permit the notice he sends to the Director shall also be displayed at the same locations as the original Permit The suspended varied or cance ll ed Permit shall be removed from disp lay at the construction site(s)

16 The Permit Holder shal l construct the Project in accordance with the project description in Part B of this Perm it (hereafter referred to as the Project)

17 The Permit Holder shal l ensu re that the Project is designed and constructed in accordance ith the middot relevant information and recommenda tions described in the approved CWBampIECL EIA Report (Register No AEIAR-04 1 200 I) the approved WDIIampCWB El A Report (Register No AEIA R- 1252008) the approved CRIII El A Report (Register No AEIAR-040200 I) the app lication documents for environmenta l perm it other relevant documents in the Regi ster and the information or mitigation measures described in this Permit and mitigation measu res to be recommended in submissions that shal l be deposited vi th or approved by the Director as a result of perm it condit ions contained in this Permit and mitigation measures to be recommend ed under on-going surveillance and monitorin g activit ies during a ll stages of the Project Where recommendations referred to in the documents of the Register are not expressly referred to in thi s Permit such recommendations are nevertheless to be implemented unless express) exc luded or impliedly amended in thi s Permit The Project is part of the CWB project

18 Al l deposited subm issions as required under thi s Permit shall be rect ified and

- 6shy

( Environmental Permit No FEP-12364 1200910

f~~~F uJm~5J1t FEP- 12364200910

accordance ith the comments if any made by the Director within one month of the receipt of the Director s comments or otherwise specified by the Director

19 All submiss ions approved by the Director all submissions deposited withou t comments by the Director or al l su bmissions rectified in accordance ith comments by the Director under this Permit shall be construed as part of the permit cond itions described in Pan C of th is Permit Any variation of the submissions shall be approved by the Director in writ ing or as prescribed in the relevant permit cond itions Any non-compliance ith the submissions may constitute a contra ention of the Em ironmental Impact Assessment Ordinance (Cap499) All submissions or any variation of the submiss ions shall be certified by the Environmenta l Team (ET) Leader and verified by the Independen t Environmental Checker (IEC) employed for the CWB project before submitting to the Director under this permit (see note 7)

110 The Perm it Holder shall release all final ized submissions as required under this Permit to the publ ic by depositing copies in the Environmenta l Impact Assessment Ordinance Register Offi ce or in any other places or any internet websites as specified by the Director or by any oth er means as specified by the Director for publi c inspection For this purpose the Permit Holder sha ll provide sufficient copies of the submiss ions

111 All submissions to the Director required under this Permit shall be delivered either in person or by registered ma il to the Environmenta l Im pact Assessment Ord inance Register Office (cu rrently at 27 F Southern Cen tre 130 Hennessy Road Wanchai Hong Kong) Electronic copie of al l fina lized submiss ions required under this Permit shall be prepared in H) per Text Markup Language (HTML) (version 40 or later) and in Portable Document Formflt (PDF version 40 or later) unless othem ise agreed by the Director and slull l be submitted at the same time as the hard copies

2 Special Conditions

2 1-22 fNot Used]

Environmenta l Project Committee (ENPC)

23 To Oe rsee and fac ilitate effecti ve contro l of the cumul ative environmental im pacts arising from potential multiple contracts for the construction of the en ti re Wan Chai Development Phase 11 (WDII ) and Central-Wan Chai Bypass (CWB) (hereafter referred to as the who le Project) the Permit Holder shall take part as a member of Envi ronmental Project Committee (EN PC) set up for the hole proj ect (see note 8)

The ENPC shall make recommendation to enhance the monitoring and aud it of the em iron mental performance of the whole project and other relevflnt nea rby projects on top of requi rements as set out in Conditions 31 to 42 of this Permit or corresponding set out under subsequent Environmental Permits issued for the hole project and other relevant nearby projects (see notes 7 and 8)

24 -28 [Not Used]

Measu1middotes to Mitigate Constn1ction Noise Impact

29

( Environmental Permit No FEP-12364 12009D

f~fflXr wJ ~ft~~~m FEP-1213642009 0

two weeks prior to the commencement of construction of the corresponding component(s) of the Proj ect four hard copies and one electroni c copy of the construction noise management pl an consisting of la) out plan(s) in the scale of I 1000 or other appropriate scal e and explanatory statement(s) showing the noise mitigat ion measures to include the use of movabletemporary noise barriers the use of quiet po~ered mechanical equipments and the adopt ion of multiple-phase construction schedules where appropriate The submission(s) shall be ceriified by the ET Leader and verified by the I EC as conforming to the relevant inform ation and recommendations contained in the apprO ed CWBamplECL El A Report (Register No AEIAR-OJI 200 I) and the WDII ampCWB EIA Report (Register No AEIAR-1252008) before deposit ~ith the Di rector All measures recommended in the fi nalised submission(s) under th is Condition shall be full y and proper) implemented Measures co ered by other pollution control Ord inances hall not be included in this construction noise management plan (see note 8)

2 I 0 -2 13 [Not Used]

Measures to Mitigate Landscape and Visual Impact

214 To reduce the landsca pe and visua l impact during construction stage of the Project the Permit Holder shall implement a series of landscape and isualm itigati on measures The Permit Holder shall at least one month before the commencement of corresponding parts of landscape works of th e Project deposit with the Director four hard cop ies and one electronic copy of landscape plan(s) The landscape plan(s) sha ll show th e design detail s locations implementation programme maintenance and management schedules and drm ings in the sca le of 1 I 000 or other appropriate sca le of the landscape and visual mit igation measures of th e Project Before submission to the Director the landscape plan(s) shall be cer1ified by the ET Leader and verified by the I EC as conforming to the relevant in formation and recommendat ions contained in the apprOed CWBampIECL EIA Report (Regi ter No AEIAR-0412001) and the WDII ampCWB ElA Report (Register No A El A R-1252008) A 11 measures recommended in the fin a I ised su b m ission(s) under th is Condition shall be fu lly and properly implemented (see note 8)

3 Environmental Monitoring and Audit Requirements

31 The EMampA programme shall be implemented in accordance ith the procedures and requirements as set out in the updated EMampA Manual approved for the CWB project (See note 8) An) major changes to the programme shall be justified by the ET Leader and verifi ed by the IEC employed for the CWB project (see note 7) as conforming to the information and requirements contained in the updated EMampA Manua l

32 Samples measurements and necessary remed ial actions shall be taken in accordance with the requirements of the updated EMampA Manual for the CWB project (note 8) by (a) conducting baseline env ironmental monitoring (b) conducting impact monitoring (c) carrying out remedia l actions described in EventAction Plans of the updated EMampA

Manual in accordance with the time frames set out in EventAction Plans or as agreed by the Director in case here specified criteria in the updated EMampA Man ual approved are exceeded and

(d) logging and keeping records of deta ils of (a) to (c) above for a ll parameters within 3 working days of co llection of data or completi on of remedial action(s) for the purpose of preparing and submitting the monthly EMampA Reports and to make avai lab le for inspection

- 8 shy

c Environmental Permit No FEP-12364 middot2009tD

f~JR~fufiiftf~t FEP-1 2 36-+120090

33 [Not Used]

34 Four hard copies and one electronic copy of monthly EMampA Report shall be submitted to the Director Vithin I 0 working days after th e end of each reporting month The EMampA Report s shall inc lude a summary of all non-compl iance (exceedances) of th e envi ronmental quality performance limits (Action and Limit Levels) In compiling this monthly EMampA Report all relevant cumulative const ruction impacts due to concurrent activi ties of the concurrent projects includ ing the Cen tral Reclamation Phase Ill and the Wan Chai Demiddotelopment Phase 11 projects shall be addressed The submiss ions shal l be verified by the IEC emplo)ed for the CWB project (see note 8) Addit ional copies of the submiss ion sha ll be prO ided to the Director upon request by the Director

35 Al l env ironmental monitoring and audit data submitted under this Perm it shal l be true alid and correct

4 Elecflmiddotonic Reporting of EMampA Information

f I To facil itate public inspection of th e Baseline Monitoring Report and regu lar EMampA Reports ia the EIAO Internet Webs ite and at the EJAO Register OITice electronic copies of these Reports shall be prepared in Hyper Text Markup Language (HTML) (version 40 or later) and in Portable Document Format (PDF version -LO or later) unless otherwise agreed by the Director and shall be submitted at the same time as the hardcop ies a described in Condition 34 of th is Permit For the I-ITML version a content page capable of providing h) per ink to each section and sub-section of these Reports shall be included in the beginning of the document H) per inks to all figures drawings and tab les in these Reports shall be provided in the main text from here the respective references are made All graphics in these Reports shall be in interl aced GIF format unless otherwise agreed by the Director The content of the electronic copies of these Reports must be the same as the hardcopies

42 All ellmiddotironmentalmonitori ng data desc ribed in Condition 41 above shall be made a ailablc to the public ia a dedicated eb site to be set up for the CWB project (see note 9) in the shortest practicable time and in no event later than two vveeks after the relevant ell ironmentalmonitoring data are co llected or become ava il able unless othen ise agreed with th e Director

Notes

I This Permit consists of three parts namely PART A (Main Permit) PART B (Descript ion of Designated Project) and PART C (Perm it Conditions) Any person relying on th is perm it should obtain independent legal advice on the lega l implicat ions under the Ordinance and the fo llowing notes are for genera l info rmation only

2 If there is a breach of any conditions of this Permit the Director or his authorized officer ma) ~ ith the consent of the Secretar for the Environment order the cessat ion of associated work unti I the remedia l action is taken in respect of the resultant em ironmental damage and in that case the Permit Holder shall not carry out any associated works without the permiss ion of the Director or his authorized offi cer

3 The Permit Holder ma) apply under Sect ion 13 of th e Ordinance to the Director for a variation of the conditions of this Permit The Permit Holder shall replace the original permit di splayed on the construction site b) the amended perm it

4 A person who assumes the responsibility for the vvhole or a part of the designated project(s) may

- 9shy

c Environmental Permit No FEP- I 2 3642009 D

fftffl~jur-q~~~middot1pound FEP-12364 2009 0

before he assumes responsibilit) of the designated project(s) appl) under Section 12 of the Ordinance to the Di rector for a further ell ironmental permit

5 Under Section 14 of the Ordinance the Director ma~ ith the consent of the ecretary for the Environment suspend var or cancel this Permit The suspended varied or cancelled Permit shall be removed from displa) at the construction site

6 If this Permit is cancelled or surrendered during construction of th e Project another em ironmental permit must be obtained under the Ordinance before the Project could be continued lt is an offence under secti on 26( I) of the Ordinance to construct or operate a designated project li sted in Part I of schedule 2 of the Ordinance v ithout a va lid environmental permit

7 Higlm ays Department (H) D) the Holder of Env ironmental Permit (EP) No EP-3642009 is requ ired under EP-3642009 or any subsequent EP amended b) the Director under the Ord inance (i) to establish an Em ironmental Team (ET)~ hich shall be headed b) an ET Leader (ii) to emplo) an Independent Em ironmental Checker (IEC) (i ii) to liaise ith the Holder of Em ironmcntal Permit No EP-3562009 on to jointly set up an

Environmental Project Committee (EN PC)~ and (i) to liai se with the Holder of Em ironmental Permit No EP-3562009 to jointly set up a

Communit) Liaison Group (CLG) for the CWB project

8 H) D the Holder of EP-3642009 is required under EP-3642009 or any subsequent EP amend ed by the Director under the Ordinance (i) to notify the Director in Hiting the commencement date ofconstruction of the CWB project (i i) to notify the Director the date of sett ing up the EN PC (iii) to notif) the Director the date of setting up the CLG (iv) to submit to the Director for approva l the updated Environmental Monitoring and Audit

Manual (updated EMampA Manual) () to inform the Director in riling the management organ ization of the mai n construction

companies andor any form of joint entures associated i th the construction of the CWB project

( i) to deposit ith the Director a deta iled works schedu le and locat ion plans ( ii) to deposit v ith the Director a construction noise management plan ( iii) to deposit~ ith the Director an operationa l air qual it management plan (ix) to deposit middot ith the Director landscape plan(s) (x) to depos it ~ ith the Director an addit ional mitigation plan for Slip Road 8 (x i) to submit to the Director the Baseline Monitoring Report and (-ii) to submit to the Director the month ) EMampA Reports for the CWB project

9 I I) D the Holder of Env ironmenta l Permit EP-3642009 is required under EP-3642009 or any subsequent EP amended by the Director under the Ordinance (i) to implement the proposed construction Orks of CWB including its Road Tunne l and Slip

Roads ventilation buildings and ent shaft(s) at the location sho n in Figure I of EP-36-l2009 together ith the relevant environmental mitigation measures and

(ii) to set up a dedicated eb site and notify the Director in writing the Internet address here the environmental monitoring and project data is to be placed

for the CWB project

I0 Any person vho constructs the Project contrar middot to the conditions in the Permit and is convicted of an offen ce under the Ordinance is liab le shy

( Environmemal Permit No FEP- 12364 12009D

fRmH uJJff~fifJfE FEP-123642009D

(i) on a first conviction on indictment to a fine of$ 2 million and to imprisonment for 6 months

(ii) on a second or subsequen t conviction on ind ictment to a fi ne of $ 5 mil lion and to imprisonment for years

(iii) on a first summary conviction to a fine at leve l 6 and to imprisonment for 6 months

(iv) on a second or subsequent summary conviction to a fi ne of$1 mi llion and to imprisonment for 1 year and

(v) in any case here the offence is of a contin uing nature the court or magistrate may impose a fine of$ 1 0000 fo r each day on v hich he is sat isfied the offence continued

1 I The Permit Holder may appea l aga inst any condit ion of this Permit under Section I 7 of the Ord inance i thi n 30 days of receipt of this Permit

12 The Note are for general reference only and that the Perm it Holder should refer to the EIA Ord inance for deta ils and seek independent legal advice

Environmental Permit No FEP- 12136412009D IlftilrMT-Zfc C~ I 6 I 0 I~JYliJT nJ ~v~IH ~JIIt FEP-12 3 4 2 09 D

- 11 shy

( Environmental Permit No FEP- 123642009 D

J~Jff~f oJdfr~f-6~ FEP- 1236-12009 bull0

Table la

[Not used]

Table l b Exha ust Related Design Criteria of the Ccnt1middotal Ventilation Building and t he East Ventilation Building and its Vent Shaft (based on Table 311 of the WDIIampCWB EIA Report (Registe1middot No AElAR-1252008)

Minimum mid-dischabullmiddotge Cross-sectional Exit velocity Exhaust

height (meter above (m s1

)area of stack (m2) direction

ground)

Vertica l Central Venti lation 219 8 175

Bu ildi ng (CVB)

Incl ined 45 Vent shaft of the

degree up ard East Venti lation

94 8 1625 (discharge Bui lding

tO~ ards sea (EVB)

direction)

Notes This Table shall be read in conjunction ith Condition 213 and Figure I of this Perm it The vent shaft of CVB i11 be incorporated ~ ith in the CVB

The vent shaft of EVB il l be separated from the EVB and located at the eastern break at er of the Cause~ ay Bay T) phoon Shelter

- 12shy

--shy N

COVERED BY APPROVED CWB amp IECL EIA REPIJH E IAO REGISTER NO AEIAR - ~12001 I

[

CENTRAL RECL PHASE ~-

~ 11 middott l l J

-shy -~ __r _______ __--shy- I

I

reg +

I fmiddotll

71 lt1

I

~ I

111~Srt ~ ~

Proj ect Title Wan C hai Development Phase 11 - Central-Wan C hai 13y1Jass at W~n C hai West (Contract No 11 K20 1208)- Tunnel Works

I~lfg glf ffr~famp~ -W-J- cfJtl~tT-~lli - ~ffflpoundi~ji (fltlt~J~ 11 K20 1208) ~ill I fpound

Environmental Permil No FEP 123642009D

[ ~

Figure la Location of the Project [sect la Ifi~Fifrr~

Bnuudu ofStmh 1r~a tl i 1J Itiioii~l

F cll l lf Rcclamatt OII hpound JnIIJJ

Tnm~ Rood 111 lunncl ]~yJ

t lti oadc Inn1~ Rltbullad amp iltp Road 1111111 bull bull wgtbull tl~~middot

~hp RuaJ on I leatccl 1ruuurc 1r~middot1Yn

t Iht li lUIC 11 plqlUCcl ha--rd (111 II~UI( 1 ell Jl plit Jfl(lll hlf h ulhcr l m trnnmcn1c11Pel ml c pp lliIIU)Il ~(l 11 ~- 1 71201h))

( f[~flJtf it~bullt fJi(Jl tq bull)1 ( ftt middot l-J 11 1-17 I02U ih) Jf la 11middot~ )EI51mtrrcrm~~~ FpoundP- 12J64t2oo9 o

shy

shy

1

Legend lffiiIJ

1 middot~ SI n BOUNDARY i-

VICTO~lt IIARIICUR

GDIJ1 OJlCl100 COl GC0412~7Cl1001C02

Project Tit le Wan C lwi Development Phase 11- Central-Wan Chai Bypass at Wan C hai West Figubullmiddote 1 b General Layout of the Pbullmiddotojcct (Contract No HY201208)- T unnel Worllts 1MJ 1 b I~~g 111iJFiJ~I~Jfisect~flJ ~fr~fm~=Wi - cppound95air~ili - ~ffgsectt~ (~~g~ljf HK20 1208)shy~iliifM

1Tillbull filHC tl~ prepared h I H-171 110161)1C(f ltm lrBurc IIK1l Appluauon h1r lunher Fmmlnmelllal l~rmu ( pphcat rcm rn Environmental Permit No FEP- 1 236~20090 t11 bullfll~ ppld(Jllcl middotJ~J I 1bullbull1 1 W n I-1 12CI16)il h illt~l l$1-IJlffPJID~liR FEP- 123642009D

Page 8: :Jn - EPD · 2016. 12. 14. · referenced ( 19) in Ax(-1) to EP2/H4 'C/09 11. 7. Environmental Permit Issued - Permit No.: EP-356/2009 issued to Civil Engineering and Development

( Environmental Permit No FEP-1213642009D

f~fflWF ufafi~~~ilt FEP-1 236412009D

PART C (PERMJT CONDITIONS)

1 General Conditions

11 The Permit Holder and any person Ori--ing on the Project shall comply with a ll condit ions set out in thi s Permit Any non-compliance b) any person may constitute a contravention of the Environmenta l Impact Assessment Ordinance (E IAO) (Cap499) and may become the subject of appropriate action being taken under the Ordinance

12 The Permit Holder shall ensure fu ll compliance with al l legis lation from time to time in force including ithout limi tation to the Ai r Pollution Control Ord inance (Cap 3 11 ) Water Pollution Contro l Ordi nance (Cap 358) Noise Control Ordinance (Cap 400) and Waste Disposa l Ord inance (Cap 3 54) This Perm it does not of itself constitute any ground of defense aga inst any proceed ings instituted under any legislation or imp ly any approva l under an) legislation

13 The Permit Holder shall make copies of this Permit together with a ll documents referred to in this Permit and the documents referred to in Part A of this Permit read ily available at all times for inspect ion by the Di rector or his authori zed officers at all sitesoffice covered by th is Perm it Any reference to the Permit shall incl ude a ll documents referred to in the Permit and also the relevant documents in the Register

I4 The Permit Holder shall give a copy of this Permit to the person(s) in charge of the site(s) and ensure that such person(s) ful ly understa nds all cond it ions and all req uirements incorporated by the Permit The site(s) refers to site(s) of construction of the Project and shall mean the same hereafter

15 The Permit Holder shall d isplay conspicuously a copy of this Permit on the construct ion site(s) at a I I eh icular site entrancesex its or at a convenient location for pub I ic middot s information at a 11 times The Permit Holder shall ensure that the most updated in formation about the Permi t including any amended Permit is di sp layed at such locat ions If the Permit Holder surrenders a part or the whole of this Permit the notice he sends to the Director shall also be displayed at the same locations as the original Permit The suspended varied or cance ll ed Permit shall be removed from disp lay at the construction site(s)

16 The Permit Holder shal l construct the Project in accordance with the project description in Part B of this Perm it (hereafter referred to as the Project)

17 The Permit Holder shal l ensu re that the Project is designed and constructed in accordance ith the middot relevant information and recommenda tions described in the approved CWBampIECL EIA Report (Register No AEIAR-04 1 200 I) the approved WDIIampCWB El A Report (Register No AEIA R- 1252008) the approved CRIII El A Report (Register No AEIAR-040200 I) the app lication documents for environmenta l perm it other relevant documents in the Regi ster and the information or mitigation measures described in this Permit and mitigation measu res to be recommended in submissions that shal l be deposited vi th or approved by the Director as a result of perm it condit ions contained in this Permit and mitigation measures to be recommend ed under on-going surveillance and monitorin g activit ies during a ll stages of the Project Where recommendations referred to in the documents of the Register are not expressly referred to in thi s Permit such recommendations are nevertheless to be implemented unless express) exc luded or impliedly amended in thi s Permit The Project is part of the CWB project

18 Al l deposited subm issions as required under thi s Permit shall be rect ified and

- 6shy

( Environmental Permit No FEP-12364 1200910

f~~~F uJm~5J1t FEP- 12364200910

accordance ith the comments if any made by the Director within one month of the receipt of the Director s comments or otherwise specified by the Director

19 All submiss ions approved by the Director all submissions deposited withou t comments by the Director or al l su bmissions rectified in accordance ith comments by the Director under this Permit shall be construed as part of the permit cond itions described in Pan C of th is Permit Any variation of the submissions shall be approved by the Director in writ ing or as prescribed in the relevant permit cond itions Any non-compliance ith the submissions may constitute a contra ention of the Em ironmental Impact Assessment Ordinance (Cap499) All submissions or any variation of the submiss ions shall be certified by the Environmenta l Team (ET) Leader and verified by the Independen t Environmental Checker (IEC) employed for the CWB project before submitting to the Director under this permit (see note 7)

110 The Perm it Holder shall release all final ized submissions as required under this Permit to the publ ic by depositing copies in the Environmenta l Impact Assessment Ordinance Register Offi ce or in any other places or any internet websites as specified by the Director or by any oth er means as specified by the Director for publi c inspection For this purpose the Permit Holder sha ll provide sufficient copies of the submiss ions

111 All submissions to the Director required under this Permit shall be delivered either in person or by registered ma il to the Environmenta l Im pact Assessment Ord inance Register Office (cu rrently at 27 F Southern Cen tre 130 Hennessy Road Wanchai Hong Kong) Electronic copie of al l fina lized submiss ions required under this Permit shall be prepared in H) per Text Markup Language (HTML) (version 40 or later) and in Portable Document Formflt (PDF version 40 or later) unless othem ise agreed by the Director and slull l be submitted at the same time as the hard copies

2 Special Conditions

2 1-22 fNot Used]

Environmenta l Project Committee (ENPC)

23 To Oe rsee and fac ilitate effecti ve contro l of the cumul ative environmental im pacts arising from potential multiple contracts for the construction of the en ti re Wan Chai Development Phase 11 (WDII ) and Central-Wan Chai Bypass (CWB) (hereafter referred to as the who le Project) the Permit Holder shall take part as a member of Envi ronmental Project Committee (EN PC) set up for the hole proj ect (see note 8)

The ENPC shall make recommendation to enhance the monitoring and aud it of the em iron mental performance of the whole project and other relevflnt nea rby projects on top of requi rements as set out in Conditions 31 to 42 of this Permit or corresponding set out under subsequent Environmental Permits issued for the hole project and other relevant nearby projects (see notes 7 and 8)

24 -28 [Not Used]

Measu1middotes to Mitigate Constn1ction Noise Impact

29

( Environmental Permit No FEP-12364 12009D

f~fflXr wJ ~ft~~~m FEP-1213642009 0

two weeks prior to the commencement of construction of the corresponding component(s) of the Proj ect four hard copies and one electroni c copy of the construction noise management pl an consisting of la) out plan(s) in the scale of I 1000 or other appropriate scal e and explanatory statement(s) showing the noise mitigat ion measures to include the use of movabletemporary noise barriers the use of quiet po~ered mechanical equipments and the adopt ion of multiple-phase construction schedules where appropriate The submission(s) shall be ceriified by the ET Leader and verified by the I EC as conforming to the relevant inform ation and recommendations contained in the apprO ed CWBamplECL El A Report (Register No AEIAR-OJI 200 I) and the WDII ampCWB EIA Report (Register No AEIAR-1252008) before deposit ~ith the Di rector All measures recommended in the fi nalised submission(s) under th is Condition shall be full y and proper) implemented Measures co ered by other pollution control Ord inances hall not be included in this construction noise management plan (see note 8)

2 I 0 -2 13 [Not Used]

Measures to Mitigate Landscape and Visual Impact

214 To reduce the landsca pe and visua l impact during construction stage of the Project the Permit Holder shall implement a series of landscape and isualm itigati on measures The Permit Holder shall at least one month before the commencement of corresponding parts of landscape works of th e Project deposit with the Director four hard cop ies and one electronic copy of landscape plan(s) The landscape plan(s) sha ll show th e design detail s locations implementation programme maintenance and management schedules and drm ings in the sca le of 1 I 000 or other appropriate sca le of the landscape and visual mit igation measures of th e Project Before submission to the Director the landscape plan(s) shall be cer1ified by the ET Leader and verified by the I EC as conforming to the relevant in formation and recommendat ions contained in the apprOed CWBampIECL EIA Report (Regi ter No AEIAR-0412001) and the WDII ampCWB ElA Report (Register No A El A R-1252008) A 11 measures recommended in the fin a I ised su b m ission(s) under th is Condition shall be fu lly and properly implemented (see note 8)

3 Environmental Monitoring and Audit Requirements

31 The EMampA programme shall be implemented in accordance ith the procedures and requirements as set out in the updated EMampA Manual approved for the CWB project (See note 8) An) major changes to the programme shall be justified by the ET Leader and verifi ed by the IEC employed for the CWB project (see note 7) as conforming to the information and requirements contained in the updated EMampA Manua l

32 Samples measurements and necessary remed ial actions shall be taken in accordance with the requirements of the updated EMampA Manual for the CWB project (note 8) by (a) conducting baseline env ironmental monitoring (b) conducting impact monitoring (c) carrying out remedia l actions described in EventAction Plans of the updated EMampA

Manual in accordance with the time frames set out in EventAction Plans or as agreed by the Director in case here specified criteria in the updated EMampA Man ual approved are exceeded and

(d) logging and keeping records of deta ils of (a) to (c) above for a ll parameters within 3 working days of co llection of data or completi on of remedial action(s) for the purpose of preparing and submitting the monthly EMampA Reports and to make avai lab le for inspection

- 8 shy

c Environmental Permit No FEP-12364 middot2009tD

f~JR~fufiiftf~t FEP-1 2 36-+120090

33 [Not Used]

34 Four hard copies and one electronic copy of monthly EMampA Report shall be submitted to the Director Vithin I 0 working days after th e end of each reporting month The EMampA Report s shall inc lude a summary of all non-compl iance (exceedances) of th e envi ronmental quality performance limits (Action and Limit Levels) In compiling this monthly EMampA Report all relevant cumulative const ruction impacts due to concurrent activi ties of the concurrent projects includ ing the Cen tral Reclamation Phase Ill and the Wan Chai Demiddotelopment Phase 11 projects shall be addressed The submiss ions shal l be verified by the IEC emplo)ed for the CWB project (see note 8) Addit ional copies of the submiss ion sha ll be prO ided to the Director upon request by the Director

35 Al l env ironmental monitoring and audit data submitted under this Perm it shal l be true alid and correct

4 Elecflmiddotonic Reporting of EMampA Information

f I To facil itate public inspection of th e Baseline Monitoring Report and regu lar EMampA Reports ia the EIAO Internet Webs ite and at the EJAO Register OITice electronic copies of these Reports shall be prepared in Hyper Text Markup Language (HTML) (version 40 or later) and in Portable Document Format (PDF version -LO or later) unless otherwise agreed by the Director and shall be submitted at the same time as the hardcop ies a described in Condition 34 of th is Permit For the I-ITML version a content page capable of providing h) per ink to each section and sub-section of these Reports shall be included in the beginning of the document H) per inks to all figures drawings and tab les in these Reports shall be provided in the main text from here the respective references are made All graphics in these Reports shall be in interl aced GIF format unless otherwise agreed by the Director The content of the electronic copies of these Reports must be the same as the hardcopies

42 All ellmiddotironmentalmonitori ng data desc ribed in Condition 41 above shall be made a ailablc to the public ia a dedicated eb site to be set up for the CWB project (see note 9) in the shortest practicable time and in no event later than two vveeks after the relevant ell ironmentalmonitoring data are co llected or become ava il able unless othen ise agreed with th e Director

Notes

I This Permit consists of three parts namely PART A (Main Permit) PART B (Descript ion of Designated Project) and PART C (Perm it Conditions) Any person relying on th is perm it should obtain independent legal advice on the lega l implicat ions under the Ordinance and the fo llowing notes are for genera l info rmation only

2 If there is a breach of any conditions of this Permit the Director or his authorized officer ma) ~ ith the consent of the Secretar for the Environment order the cessat ion of associated work unti I the remedia l action is taken in respect of the resultant em ironmental damage and in that case the Permit Holder shall not carry out any associated works without the permiss ion of the Director or his authorized offi cer

3 The Permit Holder ma) apply under Sect ion 13 of th e Ordinance to the Director for a variation of the conditions of this Permit The Permit Holder shall replace the original permit di splayed on the construction site b) the amended perm it

4 A person who assumes the responsibility for the vvhole or a part of the designated project(s) may

- 9shy

c Environmental Permit No FEP- I 2 3642009 D

fftffl~jur-q~~~middot1pound FEP-12364 2009 0

before he assumes responsibilit) of the designated project(s) appl) under Section 12 of the Ordinance to the Di rector for a further ell ironmental permit

5 Under Section 14 of the Ordinance the Director ma~ ith the consent of the ecretary for the Environment suspend var or cancel this Permit The suspended varied or cancelled Permit shall be removed from displa) at the construction site

6 If this Permit is cancelled or surrendered during construction of th e Project another em ironmental permit must be obtained under the Ordinance before the Project could be continued lt is an offence under secti on 26( I) of the Ordinance to construct or operate a designated project li sted in Part I of schedule 2 of the Ordinance v ithout a va lid environmental permit

7 Higlm ays Department (H) D) the Holder of Env ironmental Permit (EP) No EP-3642009 is requ ired under EP-3642009 or any subsequent EP amended b) the Director under the Ord inance (i) to establish an Em ironmental Team (ET)~ hich shall be headed b) an ET Leader (ii) to emplo) an Independent Em ironmental Checker (IEC) (i ii) to liaise ith the Holder of Em ironmcntal Permit No EP-3562009 on to jointly set up an

Environmental Project Committee (EN PC)~ and (i) to liai se with the Holder of Em ironmental Permit No EP-3562009 to jointly set up a

Communit) Liaison Group (CLG) for the CWB project

8 H) D the Holder of EP-3642009 is required under EP-3642009 or any subsequent EP amend ed by the Director under the Ordinance (i) to notify the Director in Hiting the commencement date ofconstruction of the CWB project (i i) to notify the Director the date of sett ing up the EN PC (iii) to notif) the Director the date of setting up the CLG (iv) to submit to the Director for approva l the updated Environmental Monitoring and Audit

Manual (updated EMampA Manual) () to inform the Director in riling the management organ ization of the mai n construction

companies andor any form of joint entures associated i th the construction of the CWB project

( i) to deposit ith the Director a deta iled works schedu le and locat ion plans ( ii) to deposit v ith the Director a construction noise management plan ( iii) to deposit~ ith the Director an operationa l air qual it management plan (ix) to deposit middot ith the Director landscape plan(s) (x) to depos it ~ ith the Director an addit ional mitigation plan for Slip Road 8 (x i) to submit to the Director the Baseline Monitoring Report and (-ii) to submit to the Director the month ) EMampA Reports for the CWB project

9 I I) D the Holder of Env ironmenta l Permit EP-3642009 is required under EP-3642009 or any subsequent EP amended by the Director under the Ordinance (i) to implement the proposed construction Orks of CWB including its Road Tunne l and Slip

Roads ventilation buildings and ent shaft(s) at the location sho n in Figure I of EP-36-l2009 together ith the relevant environmental mitigation measures and

(ii) to set up a dedicated eb site and notify the Director in writing the Internet address here the environmental monitoring and project data is to be placed

for the CWB project

I0 Any person vho constructs the Project contrar middot to the conditions in the Permit and is convicted of an offen ce under the Ordinance is liab le shy

( Environmemal Permit No FEP- 12364 12009D

fRmH uJJff~fifJfE FEP-123642009D

(i) on a first conviction on indictment to a fine of$ 2 million and to imprisonment for 6 months

(ii) on a second or subsequen t conviction on ind ictment to a fi ne of $ 5 mil lion and to imprisonment for years

(iii) on a first summary conviction to a fine at leve l 6 and to imprisonment for 6 months

(iv) on a second or subsequent summary conviction to a fi ne of$1 mi llion and to imprisonment for 1 year and

(v) in any case here the offence is of a contin uing nature the court or magistrate may impose a fine of$ 1 0000 fo r each day on v hich he is sat isfied the offence continued

1 I The Permit Holder may appea l aga inst any condit ion of this Permit under Section I 7 of the Ord inance i thi n 30 days of receipt of this Permit

12 The Note are for general reference only and that the Perm it Holder should refer to the EIA Ord inance for deta ils and seek independent legal advice

Environmental Permit No FEP- 12136412009D IlftilrMT-Zfc C~ I 6 I 0 I~JYliJT nJ ~v~IH ~JIIt FEP-12 3 4 2 09 D

- 11 shy

( Environmental Permit No FEP- 123642009 D

J~Jff~f oJdfr~f-6~ FEP- 1236-12009 bull0

Table la

[Not used]

Table l b Exha ust Related Design Criteria of the Ccnt1middotal Ventilation Building and t he East Ventilation Building and its Vent Shaft (based on Table 311 of the WDIIampCWB EIA Report (Registe1middot No AElAR-1252008)

Minimum mid-dischabullmiddotge Cross-sectional Exit velocity Exhaust

height (meter above (m s1

)area of stack (m2) direction

ground)

Vertica l Central Venti lation 219 8 175

Bu ildi ng (CVB)

Incl ined 45 Vent shaft of the

degree up ard East Venti lation

94 8 1625 (discharge Bui lding

tO~ ards sea (EVB)

direction)

Notes This Table shall be read in conjunction ith Condition 213 and Figure I of this Perm it The vent shaft of CVB i11 be incorporated ~ ith in the CVB

The vent shaft of EVB il l be separated from the EVB and located at the eastern break at er of the Cause~ ay Bay T) phoon Shelter

- 12shy

--shy N

COVERED BY APPROVED CWB amp IECL EIA REPIJH E IAO REGISTER NO AEIAR - ~12001 I

[

CENTRAL RECL PHASE ~-

~ 11 middott l l J

-shy -~ __r _______ __--shy- I

I

reg +

I fmiddotll

71 lt1

I

~ I

111~Srt ~ ~

Proj ect Title Wan C hai Development Phase 11 - Central-Wan C hai 13y1Jass at W~n C hai West (Contract No 11 K20 1208)- Tunnel Works

I~lfg glf ffr~famp~ -W-J- cfJtl~tT-~lli - ~ffflpoundi~ji (fltlt~J~ 11 K20 1208) ~ill I fpound

Environmental Permil No FEP 123642009D

[ ~

Figure la Location of the Project [sect la Ifi~Fifrr~

Bnuudu ofStmh 1r~a tl i 1J Itiioii~l

F cll l lf Rcclamatt OII hpound JnIIJJ

Tnm~ Rood 111 lunncl ]~yJ

t lti oadc Inn1~ Rltbullad amp iltp Road 1111111 bull bull wgtbull tl~~middot

~hp RuaJ on I leatccl 1ruuurc 1r~middot1Yn

t Iht li lUIC 11 plqlUCcl ha--rd (111 II~UI( 1 ell Jl plit Jfl(lll hlf h ulhcr l m trnnmcn1c11Pel ml c pp lliIIU)Il ~(l 11 ~- 1 71201h))

( f[~flJtf it~bullt fJi(Jl tq bull)1 ( ftt middot l-J 11 1-17 I02U ih) Jf la 11middot~ )EI51mtrrcrm~~~ FpoundP- 12J64t2oo9 o

shy

shy

1

Legend lffiiIJ

1 middot~ SI n BOUNDARY i-

VICTO~lt IIARIICUR

GDIJ1 OJlCl100 COl GC0412~7Cl1001C02

Project Tit le Wan C lwi Development Phase 11- Central-Wan Chai Bypass at Wan C hai West Figubullmiddote 1 b General Layout of the Pbullmiddotojcct (Contract No HY201208)- T unnel Worllts 1MJ 1 b I~~g 111iJFiJ~I~Jfisect~flJ ~fr~fm~=Wi - cppound95air~ili - ~ffgsectt~ (~~g~ljf HK20 1208)shy~iliifM

1Tillbull filHC tl~ prepared h I H-171 110161)1C(f ltm lrBurc IIK1l Appluauon h1r lunher Fmmlnmelllal l~rmu ( pphcat rcm rn Environmental Permit No FEP- 1 236~20090 t11 bullfll~ ppld(Jllcl middotJ~J I 1bullbull1 1 W n I-1 12CI16)il h illt~l l$1-IJlffPJID~liR FEP- 123642009D

Page 9: :Jn - EPD · 2016. 12. 14. · referenced ( 19) in Ax(-1) to EP2/H4 'C/09 11. 7. Environmental Permit Issued - Permit No.: EP-356/2009 issued to Civil Engineering and Development

( Environmental Permit No FEP-12364 1200910

f~~~F uJm~5J1t FEP- 12364200910

accordance ith the comments if any made by the Director within one month of the receipt of the Director s comments or otherwise specified by the Director

19 All submiss ions approved by the Director all submissions deposited withou t comments by the Director or al l su bmissions rectified in accordance ith comments by the Director under this Permit shall be construed as part of the permit cond itions described in Pan C of th is Permit Any variation of the submissions shall be approved by the Director in writ ing or as prescribed in the relevant permit cond itions Any non-compliance ith the submissions may constitute a contra ention of the Em ironmental Impact Assessment Ordinance (Cap499) All submissions or any variation of the submiss ions shall be certified by the Environmenta l Team (ET) Leader and verified by the Independen t Environmental Checker (IEC) employed for the CWB project before submitting to the Director under this permit (see note 7)

110 The Perm it Holder shall release all final ized submissions as required under this Permit to the publ ic by depositing copies in the Environmenta l Impact Assessment Ordinance Register Offi ce or in any other places or any internet websites as specified by the Director or by any oth er means as specified by the Director for publi c inspection For this purpose the Permit Holder sha ll provide sufficient copies of the submiss ions

111 All submissions to the Director required under this Permit shall be delivered either in person or by registered ma il to the Environmenta l Im pact Assessment Ord inance Register Office (cu rrently at 27 F Southern Cen tre 130 Hennessy Road Wanchai Hong Kong) Electronic copie of al l fina lized submiss ions required under this Permit shall be prepared in H) per Text Markup Language (HTML) (version 40 or later) and in Portable Document Formflt (PDF version 40 or later) unless othem ise agreed by the Director and slull l be submitted at the same time as the hard copies

2 Special Conditions

2 1-22 fNot Used]

Environmenta l Project Committee (ENPC)

23 To Oe rsee and fac ilitate effecti ve contro l of the cumul ative environmental im pacts arising from potential multiple contracts for the construction of the en ti re Wan Chai Development Phase 11 (WDII ) and Central-Wan Chai Bypass (CWB) (hereafter referred to as the who le Project) the Permit Holder shall take part as a member of Envi ronmental Project Committee (EN PC) set up for the hole proj ect (see note 8)

The ENPC shall make recommendation to enhance the monitoring and aud it of the em iron mental performance of the whole project and other relevflnt nea rby projects on top of requi rements as set out in Conditions 31 to 42 of this Permit or corresponding set out under subsequent Environmental Permits issued for the hole project and other relevant nearby projects (see notes 7 and 8)

24 -28 [Not Used]

Measu1middotes to Mitigate Constn1ction Noise Impact

29

( Environmental Permit No FEP-12364 12009D

f~fflXr wJ ~ft~~~m FEP-1213642009 0

two weeks prior to the commencement of construction of the corresponding component(s) of the Proj ect four hard copies and one electroni c copy of the construction noise management pl an consisting of la) out plan(s) in the scale of I 1000 or other appropriate scal e and explanatory statement(s) showing the noise mitigat ion measures to include the use of movabletemporary noise barriers the use of quiet po~ered mechanical equipments and the adopt ion of multiple-phase construction schedules where appropriate The submission(s) shall be ceriified by the ET Leader and verified by the I EC as conforming to the relevant inform ation and recommendations contained in the apprO ed CWBamplECL El A Report (Register No AEIAR-OJI 200 I) and the WDII ampCWB EIA Report (Register No AEIAR-1252008) before deposit ~ith the Di rector All measures recommended in the fi nalised submission(s) under th is Condition shall be full y and proper) implemented Measures co ered by other pollution control Ord inances hall not be included in this construction noise management plan (see note 8)

2 I 0 -2 13 [Not Used]

Measures to Mitigate Landscape and Visual Impact

214 To reduce the landsca pe and visua l impact during construction stage of the Project the Permit Holder shall implement a series of landscape and isualm itigati on measures The Permit Holder shall at least one month before the commencement of corresponding parts of landscape works of th e Project deposit with the Director four hard cop ies and one electronic copy of landscape plan(s) The landscape plan(s) sha ll show th e design detail s locations implementation programme maintenance and management schedules and drm ings in the sca le of 1 I 000 or other appropriate sca le of the landscape and visual mit igation measures of th e Project Before submission to the Director the landscape plan(s) shall be cer1ified by the ET Leader and verified by the I EC as conforming to the relevant in formation and recommendat ions contained in the apprOed CWBampIECL EIA Report (Regi ter No AEIAR-0412001) and the WDII ampCWB ElA Report (Register No A El A R-1252008) A 11 measures recommended in the fin a I ised su b m ission(s) under th is Condition shall be fu lly and properly implemented (see note 8)

3 Environmental Monitoring and Audit Requirements

31 The EMampA programme shall be implemented in accordance ith the procedures and requirements as set out in the updated EMampA Manual approved for the CWB project (See note 8) An) major changes to the programme shall be justified by the ET Leader and verifi ed by the IEC employed for the CWB project (see note 7) as conforming to the information and requirements contained in the updated EMampA Manua l

32 Samples measurements and necessary remed ial actions shall be taken in accordance with the requirements of the updated EMampA Manual for the CWB project (note 8) by (a) conducting baseline env ironmental monitoring (b) conducting impact monitoring (c) carrying out remedia l actions described in EventAction Plans of the updated EMampA

Manual in accordance with the time frames set out in EventAction Plans or as agreed by the Director in case here specified criteria in the updated EMampA Man ual approved are exceeded and

(d) logging and keeping records of deta ils of (a) to (c) above for a ll parameters within 3 working days of co llection of data or completi on of remedial action(s) for the purpose of preparing and submitting the monthly EMampA Reports and to make avai lab le for inspection

- 8 shy

c Environmental Permit No FEP-12364 middot2009tD

f~JR~fufiiftf~t FEP-1 2 36-+120090

33 [Not Used]

34 Four hard copies and one electronic copy of monthly EMampA Report shall be submitted to the Director Vithin I 0 working days after th e end of each reporting month The EMampA Report s shall inc lude a summary of all non-compl iance (exceedances) of th e envi ronmental quality performance limits (Action and Limit Levels) In compiling this monthly EMampA Report all relevant cumulative const ruction impacts due to concurrent activi ties of the concurrent projects includ ing the Cen tral Reclamation Phase Ill and the Wan Chai Demiddotelopment Phase 11 projects shall be addressed The submiss ions shal l be verified by the IEC emplo)ed for the CWB project (see note 8) Addit ional copies of the submiss ion sha ll be prO ided to the Director upon request by the Director

35 Al l env ironmental monitoring and audit data submitted under this Perm it shal l be true alid and correct

4 Elecflmiddotonic Reporting of EMampA Information

f I To facil itate public inspection of th e Baseline Monitoring Report and regu lar EMampA Reports ia the EIAO Internet Webs ite and at the EJAO Register OITice electronic copies of these Reports shall be prepared in Hyper Text Markup Language (HTML) (version 40 or later) and in Portable Document Format (PDF version -LO or later) unless otherwise agreed by the Director and shall be submitted at the same time as the hardcop ies a described in Condition 34 of th is Permit For the I-ITML version a content page capable of providing h) per ink to each section and sub-section of these Reports shall be included in the beginning of the document H) per inks to all figures drawings and tab les in these Reports shall be provided in the main text from here the respective references are made All graphics in these Reports shall be in interl aced GIF format unless otherwise agreed by the Director The content of the electronic copies of these Reports must be the same as the hardcopies

42 All ellmiddotironmentalmonitori ng data desc ribed in Condition 41 above shall be made a ailablc to the public ia a dedicated eb site to be set up for the CWB project (see note 9) in the shortest practicable time and in no event later than two vveeks after the relevant ell ironmentalmonitoring data are co llected or become ava il able unless othen ise agreed with th e Director

Notes

I This Permit consists of three parts namely PART A (Main Permit) PART B (Descript ion of Designated Project) and PART C (Perm it Conditions) Any person relying on th is perm it should obtain independent legal advice on the lega l implicat ions under the Ordinance and the fo llowing notes are for genera l info rmation only

2 If there is a breach of any conditions of this Permit the Director or his authorized officer ma) ~ ith the consent of the Secretar for the Environment order the cessat ion of associated work unti I the remedia l action is taken in respect of the resultant em ironmental damage and in that case the Permit Holder shall not carry out any associated works without the permiss ion of the Director or his authorized offi cer

3 The Permit Holder ma) apply under Sect ion 13 of th e Ordinance to the Director for a variation of the conditions of this Permit The Permit Holder shall replace the original permit di splayed on the construction site b) the amended perm it

4 A person who assumes the responsibility for the vvhole or a part of the designated project(s) may

- 9shy

c Environmental Permit No FEP- I 2 3642009 D

fftffl~jur-q~~~middot1pound FEP-12364 2009 0

before he assumes responsibilit) of the designated project(s) appl) under Section 12 of the Ordinance to the Di rector for a further ell ironmental permit

5 Under Section 14 of the Ordinance the Director ma~ ith the consent of the ecretary for the Environment suspend var or cancel this Permit The suspended varied or cancelled Permit shall be removed from displa) at the construction site

6 If this Permit is cancelled or surrendered during construction of th e Project another em ironmental permit must be obtained under the Ordinance before the Project could be continued lt is an offence under secti on 26( I) of the Ordinance to construct or operate a designated project li sted in Part I of schedule 2 of the Ordinance v ithout a va lid environmental permit

7 Higlm ays Department (H) D) the Holder of Env ironmental Permit (EP) No EP-3642009 is requ ired under EP-3642009 or any subsequent EP amended b) the Director under the Ord inance (i) to establish an Em ironmental Team (ET)~ hich shall be headed b) an ET Leader (ii) to emplo) an Independent Em ironmental Checker (IEC) (i ii) to liaise ith the Holder of Em ironmcntal Permit No EP-3562009 on to jointly set up an

Environmental Project Committee (EN PC)~ and (i) to liai se with the Holder of Em ironmental Permit No EP-3562009 to jointly set up a

Communit) Liaison Group (CLG) for the CWB project

8 H) D the Holder of EP-3642009 is required under EP-3642009 or any subsequent EP amend ed by the Director under the Ordinance (i) to notify the Director in Hiting the commencement date ofconstruction of the CWB project (i i) to notify the Director the date of sett ing up the EN PC (iii) to notif) the Director the date of setting up the CLG (iv) to submit to the Director for approva l the updated Environmental Monitoring and Audit

Manual (updated EMampA Manual) () to inform the Director in riling the management organ ization of the mai n construction

companies andor any form of joint entures associated i th the construction of the CWB project

( i) to deposit ith the Director a deta iled works schedu le and locat ion plans ( ii) to deposit v ith the Director a construction noise management plan ( iii) to deposit~ ith the Director an operationa l air qual it management plan (ix) to deposit middot ith the Director landscape plan(s) (x) to depos it ~ ith the Director an addit ional mitigation plan for Slip Road 8 (x i) to submit to the Director the Baseline Monitoring Report and (-ii) to submit to the Director the month ) EMampA Reports for the CWB project

9 I I) D the Holder of Env ironmenta l Permit EP-3642009 is required under EP-3642009 or any subsequent EP amended by the Director under the Ordinance (i) to implement the proposed construction Orks of CWB including its Road Tunne l and Slip

Roads ventilation buildings and ent shaft(s) at the location sho n in Figure I of EP-36-l2009 together ith the relevant environmental mitigation measures and

(ii) to set up a dedicated eb site and notify the Director in writing the Internet address here the environmental monitoring and project data is to be placed

for the CWB project

I0 Any person vho constructs the Project contrar middot to the conditions in the Permit and is convicted of an offen ce under the Ordinance is liab le shy

( Environmemal Permit No FEP- 12364 12009D

fRmH uJJff~fifJfE FEP-123642009D

(i) on a first conviction on indictment to a fine of$ 2 million and to imprisonment for 6 months

(ii) on a second or subsequen t conviction on ind ictment to a fi ne of $ 5 mil lion and to imprisonment for years

(iii) on a first summary conviction to a fine at leve l 6 and to imprisonment for 6 months

(iv) on a second or subsequent summary conviction to a fi ne of$1 mi llion and to imprisonment for 1 year and

(v) in any case here the offence is of a contin uing nature the court or magistrate may impose a fine of$ 1 0000 fo r each day on v hich he is sat isfied the offence continued

1 I The Permit Holder may appea l aga inst any condit ion of this Permit under Section I 7 of the Ord inance i thi n 30 days of receipt of this Permit

12 The Note are for general reference only and that the Perm it Holder should refer to the EIA Ord inance for deta ils and seek independent legal advice

Environmental Permit No FEP- 12136412009D IlftilrMT-Zfc C~ I 6 I 0 I~JYliJT nJ ~v~IH ~JIIt FEP-12 3 4 2 09 D

- 11 shy

( Environmental Permit No FEP- 123642009 D

J~Jff~f oJdfr~f-6~ FEP- 1236-12009 bull0

Table la

[Not used]

Table l b Exha ust Related Design Criteria of the Ccnt1middotal Ventilation Building and t he East Ventilation Building and its Vent Shaft (based on Table 311 of the WDIIampCWB EIA Report (Registe1middot No AElAR-1252008)

Minimum mid-dischabullmiddotge Cross-sectional Exit velocity Exhaust

height (meter above (m s1

)area of stack (m2) direction

ground)

Vertica l Central Venti lation 219 8 175

Bu ildi ng (CVB)

Incl ined 45 Vent shaft of the

degree up ard East Venti lation

94 8 1625 (discharge Bui lding

tO~ ards sea (EVB)

direction)

Notes This Table shall be read in conjunction ith Condition 213 and Figure I of this Perm it The vent shaft of CVB i11 be incorporated ~ ith in the CVB

The vent shaft of EVB il l be separated from the EVB and located at the eastern break at er of the Cause~ ay Bay T) phoon Shelter

- 12shy

--shy N

COVERED BY APPROVED CWB amp IECL EIA REPIJH E IAO REGISTER NO AEIAR - ~12001 I

[

CENTRAL RECL PHASE ~-

~ 11 middott l l J

-shy -~ __r _______ __--shy- I

I

reg +

I fmiddotll

71 lt1

I

~ I

111~Srt ~ ~

Proj ect Title Wan C hai Development Phase 11 - Central-Wan C hai 13y1Jass at W~n C hai West (Contract No 11 K20 1208)- Tunnel Works

I~lfg glf ffr~famp~ -W-J- cfJtl~tT-~lli - ~ffflpoundi~ji (fltlt~J~ 11 K20 1208) ~ill I fpound

Environmental Permil No FEP 123642009D

[ ~

Figure la Location of the Project [sect la Ifi~Fifrr~

Bnuudu ofStmh 1r~a tl i 1J Itiioii~l

F cll l lf Rcclamatt OII hpound JnIIJJ

Tnm~ Rood 111 lunncl ]~yJ

t lti oadc Inn1~ Rltbullad amp iltp Road 1111111 bull bull wgtbull tl~~middot

~hp RuaJ on I leatccl 1ruuurc 1r~middot1Yn

t Iht li lUIC 11 plqlUCcl ha--rd (111 II~UI( 1 ell Jl plit Jfl(lll hlf h ulhcr l m trnnmcn1c11Pel ml c pp lliIIU)Il ~(l 11 ~- 1 71201h))

( f[~flJtf it~bullt fJi(Jl tq bull)1 ( ftt middot l-J 11 1-17 I02U ih) Jf la 11middot~ )EI51mtrrcrm~~~ FpoundP- 12J64t2oo9 o

shy

shy

1

Legend lffiiIJ

1 middot~ SI n BOUNDARY i-

VICTO~lt IIARIICUR

GDIJ1 OJlCl100 COl GC0412~7Cl1001C02

Project Tit le Wan C lwi Development Phase 11- Central-Wan Chai Bypass at Wan C hai West Figubullmiddote 1 b General Layout of the Pbullmiddotojcct (Contract No HY201208)- T unnel Worllts 1MJ 1 b I~~g 111iJFiJ~I~Jfisect~flJ ~fr~fm~=Wi - cppound95air~ili - ~ffgsectt~ (~~g~ljf HK20 1208)shy~iliifM

1Tillbull filHC tl~ prepared h I H-171 110161)1C(f ltm lrBurc IIK1l Appluauon h1r lunher Fmmlnmelllal l~rmu ( pphcat rcm rn Environmental Permit No FEP- 1 236~20090 t11 bullfll~ ppld(Jllcl middotJ~J I 1bullbull1 1 W n I-1 12CI16)il h illt~l l$1-IJlffPJID~liR FEP- 123642009D

Page 10: :Jn - EPD · 2016. 12. 14. · referenced ( 19) in Ax(-1) to EP2/H4 'C/09 11. 7. Environmental Permit Issued - Permit No.: EP-356/2009 issued to Civil Engineering and Development

( Environmental Permit No FEP-12364 12009D

f~fflXr wJ ~ft~~~m FEP-1213642009 0

two weeks prior to the commencement of construction of the corresponding component(s) of the Proj ect four hard copies and one electroni c copy of the construction noise management pl an consisting of la) out plan(s) in the scale of I 1000 or other appropriate scal e and explanatory statement(s) showing the noise mitigat ion measures to include the use of movabletemporary noise barriers the use of quiet po~ered mechanical equipments and the adopt ion of multiple-phase construction schedules where appropriate The submission(s) shall be ceriified by the ET Leader and verified by the I EC as conforming to the relevant inform ation and recommendations contained in the apprO ed CWBamplECL El A Report (Register No AEIAR-OJI 200 I) and the WDII ampCWB EIA Report (Register No AEIAR-1252008) before deposit ~ith the Di rector All measures recommended in the fi nalised submission(s) under th is Condition shall be full y and proper) implemented Measures co ered by other pollution control Ord inances hall not be included in this construction noise management plan (see note 8)

2 I 0 -2 13 [Not Used]

Measures to Mitigate Landscape and Visual Impact

214 To reduce the landsca pe and visua l impact during construction stage of the Project the Permit Holder shall implement a series of landscape and isualm itigati on measures The Permit Holder shall at least one month before the commencement of corresponding parts of landscape works of th e Project deposit with the Director four hard cop ies and one electronic copy of landscape plan(s) The landscape plan(s) sha ll show th e design detail s locations implementation programme maintenance and management schedules and drm ings in the sca le of 1 I 000 or other appropriate sca le of the landscape and visual mit igation measures of th e Project Before submission to the Director the landscape plan(s) shall be cer1ified by the ET Leader and verified by the I EC as conforming to the relevant in formation and recommendat ions contained in the apprOed CWBampIECL EIA Report (Regi ter No AEIAR-0412001) and the WDII ampCWB ElA Report (Register No A El A R-1252008) A 11 measures recommended in the fin a I ised su b m ission(s) under th is Condition shall be fu lly and properly implemented (see note 8)

3 Environmental Monitoring and Audit Requirements

31 The EMampA programme shall be implemented in accordance ith the procedures and requirements as set out in the updated EMampA Manual approved for the CWB project (See note 8) An) major changes to the programme shall be justified by the ET Leader and verifi ed by the IEC employed for the CWB project (see note 7) as conforming to the information and requirements contained in the updated EMampA Manua l

32 Samples measurements and necessary remed ial actions shall be taken in accordance with the requirements of the updated EMampA Manual for the CWB project (note 8) by (a) conducting baseline env ironmental monitoring (b) conducting impact monitoring (c) carrying out remedia l actions described in EventAction Plans of the updated EMampA

Manual in accordance with the time frames set out in EventAction Plans or as agreed by the Director in case here specified criteria in the updated EMampA Man ual approved are exceeded and

(d) logging and keeping records of deta ils of (a) to (c) above for a ll parameters within 3 working days of co llection of data or completi on of remedial action(s) for the purpose of preparing and submitting the monthly EMampA Reports and to make avai lab le for inspection

- 8 shy

c Environmental Permit No FEP-12364 middot2009tD

f~JR~fufiiftf~t FEP-1 2 36-+120090

33 [Not Used]

34 Four hard copies and one electronic copy of monthly EMampA Report shall be submitted to the Director Vithin I 0 working days after th e end of each reporting month The EMampA Report s shall inc lude a summary of all non-compl iance (exceedances) of th e envi ronmental quality performance limits (Action and Limit Levels) In compiling this monthly EMampA Report all relevant cumulative const ruction impacts due to concurrent activi ties of the concurrent projects includ ing the Cen tral Reclamation Phase Ill and the Wan Chai Demiddotelopment Phase 11 projects shall be addressed The submiss ions shal l be verified by the IEC emplo)ed for the CWB project (see note 8) Addit ional copies of the submiss ion sha ll be prO ided to the Director upon request by the Director

35 Al l env ironmental monitoring and audit data submitted under this Perm it shal l be true alid and correct

4 Elecflmiddotonic Reporting of EMampA Information

f I To facil itate public inspection of th e Baseline Monitoring Report and regu lar EMampA Reports ia the EIAO Internet Webs ite and at the EJAO Register OITice electronic copies of these Reports shall be prepared in Hyper Text Markup Language (HTML) (version 40 or later) and in Portable Document Format (PDF version -LO or later) unless otherwise agreed by the Director and shall be submitted at the same time as the hardcop ies a described in Condition 34 of th is Permit For the I-ITML version a content page capable of providing h) per ink to each section and sub-section of these Reports shall be included in the beginning of the document H) per inks to all figures drawings and tab les in these Reports shall be provided in the main text from here the respective references are made All graphics in these Reports shall be in interl aced GIF format unless otherwise agreed by the Director The content of the electronic copies of these Reports must be the same as the hardcopies

42 All ellmiddotironmentalmonitori ng data desc ribed in Condition 41 above shall be made a ailablc to the public ia a dedicated eb site to be set up for the CWB project (see note 9) in the shortest practicable time and in no event later than two vveeks after the relevant ell ironmentalmonitoring data are co llected or become ava il able unless othen ise agreed with th e Director

Notes

I This Permit consists of three parts namely PART A (Main Permit) PART B (Descript ion of Designated Project) and PART C (Perm it Conditions) Any person relying on th is perm it should obtain independent legal advice on the lega l implicat ions under the Ordinance and the fo llowing notes are for genera l info rmation only

2 If there is a breach of any conditions of this Permit the Director or his authorized officer ma) ~ ith the consent of the Secretar for the Environment order the cessat ion of associated work unti I the remedia l action is taken in respect of the resultant em ironmental damage and in that case the Permit Holder shall not carry out any associated works without the permiss ion of the Director or his authorized offi cer

3 The Permit Holder ma) apply under Sect ion 13 of th e Ordinance to the Director for a variation of the conditions of this Permit The Permit Holder shall replace the original permit di splayed on the construction site b) the amended perm it

4 A person who assumes the responsibility for the vvhole or a part of the designated project(s) may

- 9shy

c Environmental Permit No FEP- I 2 3642009 D

fftffl~jur-q~~~middot1pound FEP-12364 2009 0

before he assumes responsibilit) of the designated project(s) appl) under Section 12 of the Ordinance to the Di rector for a further ell ironmental permit

5 Under Section 14 of the Ordinance the Director ma~ ith the consent of the ecretary for the Environment suspend var or cancel this Permit The suspended varied or cancelled Permit shall be removed from displa) at the construction site

6 If this Permit is cancelled or surrendered during construction of th e Project another em ironmental permit must be obtained under the Ordinance before the Project could be continued lt is an offence under secti on 26( I) of the Ordinance to construct or operate a designated project li sted in Part I of schedule 2 of the Ordinance v ithout a va lid environmental permit

7 Higlm ays Department (H) D) the Holder of Env ironmental Permit (EP) No EP-3642009 is requ ired under EP-3642009 or any subsequent EP amended b) the Director under the Ord inance (i) to establish an Em ironmental Team (ET)~ hich shall be headed b) an ET Leader (ii) to emplo) an Independent Em ironmental Checker (IEC) (i ii) to liaise ith the Holder of Em ironmcntal Permit No EP-3562009 on to jointly set up an

Environmental Project Committee (EN PC)~ and (i) to liai se with the Holder of Em ironmental Permit No EP-3562009 to jointly set up a

Communit) Liaison Group (CLG) for the CWB project

8 H) D the Holder of EP-3642009 is required under EP-3642009 or any subsequent EP amend ed by the Director under the Ordinance (i) to notify the Director in Hiting the commencement date ofconstruction of the CWB project (i i) to notify the Director the date of sett ing up the EN PC (iii) to notif) the Director the date of setting up the CLG (iv) to submit to the Director for approva l the updated Environmental Monitoring and Audit

Manual (updated EMampA Manual) () to inform the Director in riling the management organ ization of the mai n construction

companies andor any form of joint entures associated i th the construction of the CWB project

( i) to deposit ith the Director a deta iled works schedu le and locat ion plans ( ii) to deposit v ith the Director a construction noise management plan ( iii) to deposit~ ith the Director an operationa l air qual it management plan (ix) to deposit middot ith the Director landscape plan(s) (x) to depos it ~ ith the Director an addit ional mitigation plan for Slip Road 8 (x i) to submit to the Director the Baseline Monitoring Report and (-ii) to submit to the Director the month ) EMampA Reports for the CWB project

9 I I) D the Holder of Env ironmenta l Permit EP-3642009 is required under EP-3642009 or any subsequent EP amended by the Director under the Ordinance (i) to implement the proposed construction Orks of CWB including its Road Tunne l and Slip

Roads ventilation buildings and ent shaft(s) at the location sho n in Figure I of EP-36-l2009 together ith the relevant environmental mitigation measures and

(ii) to set up a dedicated eb site and notify the Director in writing the Internet address here the environmental monitoring and project data is to be placed

for the CWB project

I0 Any person vho constructs the Project contrar middot to the conditions in the Permit and is convicted of an offen ce under the Ordinance is liab le shy

( Environmemal Permit No FEP- 12364 12009D

fRmH uJJff~fifJfE FEP-123642009D

(i) on a first conviction on indictment to a fine of$ 2 million and to imprisonment for 6 months

(ii) on a second or subsequen t conviction on ind ictment to a fi ne of $ 5 mil lion and to imprisonment for years

(iii) on a first summary conviction to a fine at leve l 6 and to imprisonment for 6 months

(iv) on a second or subsequent summary conviction to a fi ne of$1 mi llion and to imprisonment for 1 year and

(v) in any case here the offence is of a contin uing nature the court or magistrate may impose a fine of$ 1 0000 fo r each day on v hich he is sat isfied the offence continued

1 I The Permit Holder may appea l aga inst any condit ion of this Permit under Section I 7 of the Ord inance i thi n 30 days of receipt of this Permit

12 The Note are for general reference only and that the Perm it Holder should refer to the EIA Ord inance for deta ils and seek independent legal advice

Environmental Permit No FEP- 12136412009D IlftilrMT-Zfc C~ I 6 I 0 I~JYliJT nJ ~v~IH ~JIIt FEP-12 3 4 2 09 D

- 11 shy

( Environmental Permit No FEP- 123642009 D

J~Jff~f oJdfr~f-6~ FEP- 1236-12009 bull0

Table la

[Not used]

Table l b Exha ust Related Design Criteria of the Ccnt1middotal Ventilation Building and t he East Ventilation Building and its Vent Shaft (based on Table 311 of the WDIIampCWB EIA Report (Registe1middot No AElAR-1252008)

Minimum mid-dischabullmiddotge Cross-sectional Exit velocity Exhaust

height (meter above (m s1

)area of stack (m2) direction

ground)

Vertica l Central Venti lation 219 8 175

Bu ildi ng (CVB)

Incl ined 45 Vent shaft of the

degree up ard East Venti lation

94 8 1625 (discharge Bui lding

tO~ ards sea (EVB)

direction)

Notes This Table shall be read in conjunction ith Condition 213 and Figure I of this Perm it The vent shaft of CVB i11 be incorporated ~ ith in the CVB

The vent shaft of EVB il l be separated from the EVB and located at the eastern break at er of the Cause~ ay Bay T) phoon Shelter

- 12shy

--shy N

COVERED BY APPROVED CWB amp IECL EIA REPIJH E IAO REGISTER NO AEIAR - ~12001 I

[

CENTRAL RECL PHASE ~-

~ 11 middott l l J

-shy -~ __r _______ __--shy- I

I

reg +

I fmiddotll

71 lt1

I

~ I

111~Srt ~ ~

Proj ect Title Wan C hai Development Phase 11 - Central-Wan C hai 13y1Jass at W~n C hai West (Contract No 11 K20 1208)- Tunnel Works

I~lfg glf ffr~famp~ -W-J- cfJtl~tT-~lli - ~ffflpoundi~ji (fltlt~J~ 11 K20 1208) ~ill I fpound

Environmental Permil No FEP 123642009D

[ ~

Figure la Location of the Project [sect la Ifi~Fifrr~

Bnuudu ofStmh 1r~a tl i 1J Itiioii~l

F cll l lf Rcclamatt OII hpound JnIIJJ

Tnm~ Rood 111 lunncl ]~yJ

t lti oadc Inn1~ Rltbullad amp iltp Road 1111111 bull bull wgtbull tl~~middot

~hp RuaJ on I leatccl 1ruuurc 1r~middot1Yn

t Iht li lUIC 11 plqlUCcl ha--rd (111 II~UI( 1 ell Jl plit Jfl(lll hlf h ulhcr l m trnnmcn1c11Pel ml c pp lliIIU)Il ~(l 11 ~- 1 71201h))

( f[~flJtf it~bullt fJi(Jl tq bull)1 ( ftt middot l-J 11 1-17 I02U ih) Jf la 11middot~ )EI51mtrrcrm~~~ FpoundP- 12J64t2oo9 o

shy

shy

1

Legend lffiiIJ

1 middot~ SI n BOUNDARY i-

VICTO~lt IIARIICUR

GDIJ1 OJlCl100 COl GC0412~7Cl1001C02

Project Tit le Wan C lwi Development Phase 11- Central-Wan Chai Bypass at Wan C hai West Figubullmiddote 1 b General Layout of the Pbullmiddotojcct (Contract No HY201208)- T unnel Worllts 1MJ 1 b I~~g 111iJFiJ~I~Jfisect~flJ ~fr~fm~=Wi - cppound95air~ili - ~ffgsectt~ (~~g~ljf HK20 1208)shy~iliifM

1Tillbull filHC tl~ prepared h I H-171 110161)1C(f ltm lrBurc IIK1l Appluauon h1r lunher Fmmlnmelllal l~rmu ( pphcat rcm rn Environmental Permit No FEP- 1 236~20090 t11 bullfll~ ppld(Jllcl middotJ~J I 1bullbull1 1 W n I-1 12CI16)il h illt~l l$1-IJlffPJID~liR FEP- 123642009D

Page 11: :Jn - EPD · 2016. 12. 14. · referenced ( 19) in Ax(-1) to EP2/H4 'C/09 11. 7. Environmental Permit Issued - Permit No.: EP-356/2009 issued to Civil Engineering and Development

c Environmental Permit No FEP-12364 middot2009tD

f~JR~fufiiftf~t FEP-1 2 36-+120090

33 [Not Used]

34 Four hard copies and one electronic copy of monthly EMampA Report shall be submitted to the Director Vithin I 0 working days after th e end of each reporting month The EMampA Report s shall inc lude a summary of all non-compl iance (exceedances) of th e envi ronmental quality performance limits (Action and Limit Levels) In compiling this monthly EMampA Report all relevant cumulative const ruction impacts due to concurrent activi ties of the concurrent projects includ ing the Cen tral Reclamation Phase Ill and the Wan Chai Demiddotelopment Phase 11 projects shall be addressed The submiss ions shal l be verified by the IEC emplo)ed for the CWB project (see note 8) Addit ional copies of the submiss ion sha ll be prO ided to the Director upon request by the Director

35 Al l env ironmental monitoring and audit data submitted under this Perm it shal l be true alid and correct

4 Elecflmiddotonic Reporting of EMampA Information

f I To facil itate public inspection of th e Baseline Monitoring Report and regu lar EMampA Reports ia the EIAO Internet Webs ite and at the EJAO Register OITice electronic copies of these Reports shall be prepared in Hyper Text Markup Language (HTML) (version 40 or later) and in Portable Document Format (PDF version -LO or later) unless otherwise agreed by the Director and shall be submitted at the same time as the hardcop ies a described in Condition 34 of th is Permit For the I-ITML version a content page capable of providing h) per ink to each section and sub-section of these Reports shall be included in the beginning of the document H) per inks to all figures drawings and tab les in these Reports shall be provided in the main text from here the respective references are made All graphics in these Reports shall be in interl aced GIF format unless otherwise agreed by the Director The content of the electronic copies of these Reports must be the same as the hardcopies

42 All ellmiddotironmentalmonitori ng data desc ribed in Condition 41 above shall be made a ailablc to the public ia a dedicated eb site to be set up for the CWB project (see note 9) in the shortest practicable time and in no event later than two vveeks after the relevant ell ironmentalmonitoring data are co llected or become ava il able unless othen ise agreed with th e Director

Notes

I This Permit consists of three parts namely PART A (Main Permit) PART B (Descript ion of Designated Project) and PART C (Perm it Conditions) Any person relying on th is perm it should obtain independent legal advice on the lega l implicat ions under the Ordinance and the fo llowing notes are for genera l info rmation only

2 If there is a breach of any conditions of this Permit the Director or his authorized officer ma) ~ ith the consent of the Secretar for the Environment order the cessat ion of associated work unti I the remedia l action is taken in respect of the resultant em ironmental damage and in that case the Permit Holder shall not carry out any associated works without the permiss ion of the Director or his authorized offi cer

3 The Permit Holder ma) apply under Sect ion 13 of th e Ordinance to the Director for a variation of the conditions of this Permit The Permit Holder shall replace the original permit di splayed on the construction site b) the amended perm it

4 A person who assumes the responsibility for the vvhole or a part of the designated project(s) may

- 9shy

c Environmental Permit No FEP- I 2 3642009 D

fftffl~jur-q~~~middot1pound FEP-12364 2009 0

before he assumes responsibilit) of the designated project(s) appl) under Section 12 of the Ordinance to the Di rector for a further ell ironmental permit

5 Under Section 14 of the Ordinance the Director ma~ ith the consent of the ecretary for the Environment suspend var or cancel this Permit The suspended varied or cancelled Permit shall be removed from displa) at the construction site

6 If this Permit is cancelled or surrendered during construction of th e Project another em ironmental permit must be obtained under the Ordinance before the Project could be continued lt is an offence under secti on 26( I) of the Ordinance to construct or operate a designated project li sted in Part I of schedule 2 of the Ordinance v ithout a va lid environmental permit

7 Higlm ays Department (H) D) the Holder of Env ironmental Permit (EP) No EP-3642009 is requ ired under EP-3642009 or any subsequent EP amended b) the Director under the Ord inance (i) to establish an Em ironmental Team (ET)~ hich shall be headed b) an ET Leader (ii) to emplo) an Independent Em ironmental Checker (IEC) (i ii) to liaise ith the Holder of Em ironmcntal Permit No EP-3562009 on to jointly set up an

Environmental Project Committee (EN PC)~ and (i) to liai se with the Holder of Em ironmental Permit No EP-3562009 to jointly set up a

Communit) Liaison Group (CLG) for the CWB project

8 H) D the Holder of EP-3642009 is required under EP-3642009 or any subsequent EP amend ed by the Director under the Ordinance (i) to notify the Director in Hiting the commencement date ofconstruction of the CWB project (i i) to notify the Director the date of sett ing up the EN PC (iii) to notif) the Director the date of setting up the CLG (iv) to submit to the Director for approva l the updated Environmental Monitoring and Audit

Manual (updated EMampA Manual) () to inform the Director in riling the management organ ization of the mai n construction

companies andor any form of joint entures associated i th the construction of the CWB project

( i) to deposit ith the Director a deta iled works schedu le and locat ion plans ( ii) to deposit v ith the Director a construction noise management plan ( iii) to deposit~ ith the Director an operationa l air qual it management plan (ix) to deposit middot ith the Director landscape plan(s) (x) to depos it ~ ith the Director an addit ional mitigation plan for Slip Road 8 (x i) to submit to the Director the Baseline Monitoring Report and (-ii) to submit to the Director the month ) EMampA Reports for the CWB project

9 I I) D the Holder of Env ironmenta l Permit EP-3642009 is required under EP-3642009 or any subsequent EP amended by the Director under the Ordinance (i) to implement the proposed construction Orks of CWB including its Road Tunne l and Slip

Roads ventilation buildings and ent shaft(s) at the location sho n in Figure I of EP-36-l2009 together ith the relevant environmental mitigation measures and

(ii) to set up a dedicated eb site and notify the Director in writing the Internet address here the environmental monitoring and project data is to be placed

for the CWB project

I0 Any person vho constructs the Project contrar middot to the conditions in the Permit and is convicted of an offen ce under the Ordinance is liab le shy

( Environmemal Permit No FEP- 12364 12009D

fRmH uJJff~fifJfE FEP-123642009D

(i) on a first conviction on indictment to a fine of$ 2 million and to imprisonment for 6 months

(ii) on a second or subsequen t conviction on ind ictment to a fi ne of $ 5 mil lion and to imprisonment for years

(iii) on a first summary conviction to a fine at leve l 6 and to imprisonment for 6 months

(iv) on a second or subsequent summary conviction to a fi ne of$1 mi llion and to imprisonment for 1 year and

(v) in any case here the offence is of a contin uing nature the court or magistrate may impose a fine of$ 1 0000 fo r each day on v hich he is sat isfied the offence continued

1 I The Permit Holder may appea l aga inst any condit ion of this Permit under Section I 7 of the Ord inance i thi n 30 days of receipt of this Permit

12 The Note are for general reference only and that the Perm it Holder should refer to the EIA Ord inance for deta ils and seek independent legal advice

Environmental Permit No FEP- 12136412009D IlftilrMT-Zfc C~ I 6 I 0 I~JYliJT nJ ~v~IH ~JIIt FEP-12 3 4 2 09 D

- 11 shy

( Environmental Permit No FEP- 123642009 D

J~Jff~f oJdfr~f-6~ FEP- 1236-12009 bull0

Table la

[Not used]

Table l b Exha ust Related Design Criteria of the Ccnt1middotal Ventilation Building and t he East Ventilation Building and its Vent Shaft (based on Table 311 of the WDIIampCWB EIA Report (Registe1middot No AElAR-1252008)

Minimum mid-dischabullmiddotge Cross-sectional Exit velocity Exhaust

height (meter above (m s1

)area of stack (m2) direction

ground)

Vertica l Central Venti lation 219 8 175

Bu ildi ng (CVB)

Incl ined 45 Vent shaft of the

degree up ard East Venti lation

94 8 1625 (discharge Bui lding

tO~ ards sea (EVB)

direction)

Notes This Table shall be read in conjunction ith Condition 213 and Figure I of this Perm it The vent shaft of CVB i11 be incorporated ~ ith in the CVB

The vent shaft of EVB il l be separated from the EVB and located at the eastern break at er of the Cause~ ay Bay T) phoon Shelter

- 12shy

--shy N

COVERED BY APPROVED CWB amp IECL EIA REPIJH E IAO REGISTER NO AEIAR - ~12001 I

[

CENTRAL RECL PHASE ~-

~ 11 middott l l J

-shy -~ __r _______ __--shy- I

I

reg +

I fmiddotll

71 lt1

I

~ I

111~Srt ~ ~

Proj ect Title Wan C hai Development Phase 11 - Central-Wan C hai 13y1Jass at W~n C hai West (Contract No 11 K20 1208)- Tunnel Works

I~lfg glf ffr~famp~ -W-J- cfJtl~tT-~lli - ~ffflpoundi~ji (fltlt~J~ 11 K20 1208) ~ill I fpound

Environmental Permil No FEP 123642009D

[ ~

Figure la Location of the Project [sect la Ifi~Fifrr~

Bnuudu ofStmh 1r~a tl i 1J Itiioii~l

F cll l lf Rcclamatt OII hpound JnIIJJ

Tnm~ Rood 111 lunncl ]~yJ

t lti oadc Inn1~ Rltbullad amp iltp Road 1111111 bull bull wgtbull tl~~middot

~hp RuaJ on I leatccl 1ruuurc 1r~middot1Yn

t Iht li lUIC 11 plqlUCcl ha--rd (111 II~UI( 1 ell Jl plit Jfl(lll hlf h ulhcr l m trnnmcn1c11Pel ml c pp lliIIU)Il ~(l 11 ~- 1 71201h))

( f[~flJtf it~bullt fJi(Jl tq bull)1 ( ftt middot l-J 11 1-17 I02U ih) Jf la 11middot~ )EI51mtrrcrm~~~ FpoundP- 12J64t2oo9 o

shy

shy

1

Legend lffiiIJ

1 middot~ SI n BOUNDARY i-

VICTO~lt IIARIICUR

GDIJ1 OJlCl100 COl GC0412~7Cl1001C02

Project Tit le Wan C lwi Development Phase 11- Central-Wan Chai Bypass at Wan C hai West Figubullmiddote 1 b General Layout of the Pbullmiddotojcct (Contract No HY201208)- T unnel Worllts 1MJ 1 b I~~g 111iJFiJ~I~Jfisect~flJ ~fr~fm~=Wi - cppound95air~ili - ~ffgsectt~ (~~g~ljf HK20 1208)shy~iliifM

1Tillbull filHC tl~ prepared h I H-171 110161)1C(f ltm lrBurc IIK1l Appluauon h1r lunher Fmmlnmelllal l~rmu ( pphcat rcm rn Environmental Permit No FEP- 1 236~20090 t11 bullfll~ ppld(Jllcl middotJ~J I 1bullbull1 1 W n I-1 12CI16)il h illt~l l$1-IJlffPJID~liR FEP- 123642009D

Page 12: :Jn - EPD · 2016. 12. 14. · referenced ( 19) in Ax(-1) to EP2/H4 'C/09 11. 7. Environmental Permit Issued - Permit No.: EP-356/2009 issued to Civil Engineering and Development

c Environmental Permit No FEP- I 2 3642009 D

fftffl~jur-q~~~middot1pound FEP-12364 2009 0

before he assumes responsibilit) of the designated project(s) appl) under Section 12 of the Ordinance to the Di rector for a further ell ironmental permit

5 Under Section 14 of the Ordinance the Director ma~ ith the consent of the ecretary for the Environment suspend var or cancel this Permit The suspended varied or cancelled Permit shall be removed from displa) at the construction site

6 If this Permit is cancelled or surrendered during construction of th e Project another em ironmental permit must be obtained under the Ordinance before the Project could be continued lt is an offence under secti on 26( I) of the Ordinance to construct or operate a designated project li sted in Part I of schedule 2 of the Ordinance v ithout a va lid environmental permit

7 Higlm ays Department (H) D) the Holder of Env ironmental Permit (EP) No EP-3642009 is requ ired under EP-3642009 or any subsequent EP amended b) the Director under the Ord inance (i) to establish an Em ironmental Team (ET)~ hich shall be headed b) an ET Leader (ii) to emplo) an Independent Em ironmental Checker (IEC) (i ii) to liaise ith the Holder of Em ironmcntal Permit No EP-3562009 on to jointly set up an

Environmental Project Committee (EN PC)~ and (i) to liai se with the Holder of Em ironmental Permit No EP-3562009 to jointly set up a

Communit) Liaison Group (CLG) for the CWB project

8 H) D the Holder of EP-3642009 is required under EP-3642009 or any subsequent EP amend ed by the Director under the Ordinance (i) to notify the Director in Hiting the commencement date ofconstruction of the CWB project (i i) to notify the Director the date of sett ing up the EN PC (iii) to notif) the Director the date of setting up the CLG (iv) to submit to the Director for approva l the updated Environmental Monitoring and Audit

Manual (updated EMampA Manual) () to inform the Director in riling the management organ ization of the mai n construction

companies andor any form of joint entures associated i th the construction of the CWB project

( i) to deposit ith the Director a deta iled works schedu le and locat ion plans ( ii) to deposit v ith the Director a construction noise management plan ( iii) to deposit~ ith the Director an operationa l air qual it management plan (ix) to deposit middot ith the Director landscape plan(s) (x) to depos it ~ ith the Director an addit ional mitigation plan for Slip Road 8 (x i) to submit to the Director the Baseline Monitoring Report and (-ii) to submit to the Director the month ) EMampA Reports for the CWB project

9 I I) D the Holder of Env ironmenta l Permit EP-3642009 is required under EP-3642009 or any subsequent EP amended by the Director under the Ordinance (i) to implement the proposed construction Orks of CWB including its Road Tunne l and Slip

Roads ventilation buildings and ent shaft(s) at the location sho n in Figure I of EP-36-l2009 together ith the relevant environmental mitigation measures and

(ii) to set up a dedicated eb site and notify the Director in writing the Internet address here the environmental monitoring and project data is to be placed

for the CWB project

I0 Any person vho constructs the Project contrar middot to the conditions in the Permit and is convicted of an offen ce under the Ordinance is liab le shy

( Environmemal Permit No FEP- 12364 12009D

fRmH uJJff~fifJfE FEP-123642009D

(i) on a first conviction on indictment to a fine of$ 2 million and to imprisonment for 6 months

(ii) on a second or subsequen t conviction on ind ictment to a fi ne of $ 5 mil lion and to imprisonment for years

(iii) on a first summary conviction to a fine at leve l 6 and to imprisonment for 6 months

(iv) on a second or subsequent summary conviction to a fi ne of$1 mi llion and to imprisonment for 1 year and

(v) in any case here the offence is of a contin uing nature the court or magistrate may impose a fine of$ 1 0000 fo r each day on v hich he is sat isfied the offence continued

1 I The Permit Holder may appea l aga inst any condit ion of this Permit under Section I 7 of the Ord inance i thi n 30 days of receipt of this Permit

12 The Note are for general reference only and that the Perm it Holder should refer to the EIA Ord inance for deta ils and seek independent legal advice

Environmental Permit No FEP- 12136412009D IlftilrMT-Zfc C~ I 6 I 0 I~JYliJT nJ ~v~IH ~JIIt FEP-12 3 4 2 09 D

- 11 shy

( Environmental Permit No FEP- 123642009 D

J~Jff~f oJdfr~f-6~ FEP- 1236-12009 bull0

Table la

[Not used]

Table l b Exha ust Related Design Criteria of the Ccnt1middotal Ventilation Building and t he East Ventilation Building and its Vent Shaft (based on Table 311 of the WDIIampCWB EIA Report (Registe1middot No AElAR-1252008)

Minimum mid-dischabullmiddotge Cross-sectional Exit velocity Exhaust

height (meter above (m s1

)area of stack (m2) direction

ground)

Vertica l Central Venti lation 219 8 175

Bu ildi ng (CVB)

Incl ined 45 Vent shaft of the

degree up ard East Venti lation

94 8 1625 (discharge Bui lding

tO~ ards sea (EVB)

direction)

Notes This Table shall be read in conjunction ith Condition 213 and Figure I of this Perm it The vent shaft of CVB i11 be incorporated ~ ith in the CVB

The vent shaft of EVB il l be separated from the EVB and located at the eastern break at er of the Cause~ ay Bay T) phoon Shelter

- 12shy

--shy N

COVERED BY APPROVED CWB amp IECL EIA REPIJH E IAO REGISTER NO AEIAR - ~12001 I

[

CENTRAL RECL PHASE ~-

~ 11 middott l l J

-shy -~ __r _______ __--shy- I

I

reg +

I fmiddotll

71 lt1

I

~ I

111~Srt ~ ~

Proj ect Title Wan C hai Development Phase 11 - Central-Wan C hai 13y1Jass at W~n C hai West (Contract No 11 K20 1208)- Tunnel Works

I~lfg glf ffr~famp~ -W-J- cfJtl~tT-~lli - ~ffflpoundi~ji (fltlt~J~ 11 K20 1208) ~ill I fpound

Environmental Permil No FEP 123642009D

[ ~

Figure la Location of the Project [sect la Ifi~Fifrr~

Bnuudu ofStmh 1r~a tl i 1J Itiioii~l

F cll l lf Rcclamatt OII hpound JnIIJJ

Tnm~ Rood 111 lunncl ]~yJ

t lti oadc Inn1~ Rltbullad amp iltp Road 1111111 bull bull wgtbull tl~~middot

~hp RuaJ on I leatccl 1ruuurc 1r~middot1Yn

t Iht li lUIC 11 plqlUCcl ha--rd (111 II~UI( 1 ell Jl plit Jfl(lll hlf h ulhcr l m trnnmcn1c11Pel ml c pp lliIIU)Il ~(l 11 ~- 1 71201h))

( f[~flJtf it~bullt fJi(Jl tq bull)1 ( ftt middot l-J 11 1-17 I02U ih) Jf la 11middot~ )EI51mtrrcrm~~~ FpoundP- 12J64t2oo9 o

shy

shy

1

Legend lffiiIJ

1 middot~ SI n BOUNDARY i-

VICTO~lt IIARIICUR

GDIJ1 OJlCl100 COl GC0412~7Cl1001C02

Project Tit le Wan C lwi Development Phase 11- Central-Wan Chai Bypass at Wan C hai West Figubullmiddote 1 b General Layout of the Pbullmiddotojcct (Contract No HY201208)- T unnel Worllts 1MJ 1 b I~~g 111iJFiJ~I~Jfisect~flJ ~fr~fm~=Wi - cppound95air~ili - ~ffgsectt~ (~~g~ljf HK20 1208)shy~iliifM

1Tillbull filHC tl~ prepared h I H-171 110161)1C(f ltm lrBurc IIK1l Appluauon h1r lunher Fmmlnmelllal l~rmu ( pphcat rcm rn Environmental Permit No FEP- 1 236~20090 t11 bullfll~ ppld(Jllcl middotJ~J I 1bullbull1 1 W n I-1 12CI16)il h illt~l l$1-IJlffPJID~liR FEP- 123642009D

Page 13: :Jn - EPD · 2016. 12. 14. · referenced ( 19) in Ax(-1) to EP2/H4 'C/09 11. 7. Environmental Permit Issued - Permit No.: EP-356/2009 issued to Civil Engineering and Development

( Environmemal Permit No FEP- 12364 12009D

fRmH uJJff~fifJfE FEP-123642009D

(i) on a first conviction on indictment to a fine of$ 2 million and to imprisonment for 6 months

(ii) on a second or subsequen t conviction on ind ictment to a fi ne of $ 5 mil lion and to imprisonment for years

(iii) on a first summary conviction to a fine at leve l 6 and to imprisonment for 6 months

(iv) on a second or subsequent summary conviction to a fi ne of$1 mi llion and to imprisonment for 1 year and

(v) in any case here the offence is of a contin uing nature the court or magistrate may impose a fine of$ 1 0000 fo r each day on v hich he is sat isfied the offence continued

1 I The Permit Holder may appea l aga inst any condit ion of this Permit under Section I 7 of the Ord inance i thi n 30 days of receipt of this Permit

12 The Note are for general reference only and that the Perm it Holder should refer to the EIA Ord inance for deta ils and seek independent legal advice

Environmental Permit No FEP- 12136412009D IlftilrMT-Zfc C~ I 6 I 0 I~JYliJT nJ ~v~IH ~JIIt FEP-12 3 4 2 09 D

- 11 shy

( Environmental Permit No FEP- 123642009 D

J~Jff~f oJdfr~f-6~ FEP- 1236-12009 bull0

Table la

[Not used]

Table l b Exha ust Related Design Criteria of the Ccnt1middotal Ventilation Building and t he East Ventilation Building and its Vent Shaft (based on Table 311 of the WDIIampCWB EIA Report (Registe1middot No AElAR-1252008)

Minimum mid-dischabullmiddotge Cross-sectional Exit velocity Exhaust

height (meter above (m s1

)area of stack (m2) direction

ground)

Vertica l Central Venti lation 219 8 175

Bu ildi ng (CVB)

Incl ined 45 Vent shaft of the

degree up ard East Venti lation

94 8 1625 (discharge Bui lding

tO~ ards sea (EVB)

direction)

Notes This Table shall be read in conjunction ith Condition 213 and Figure I of this Perm it The vent shaft of CVB i11 be incorporated ~ ith in the CVB

The vent shaft of EVB il l be separated from the EVB and located at the eastern break at er of the Cause~ ay Bay T) phoon Shelter

- 12shy

--shy N

COVERED BY APPROVED CWB amp IECL EIA REPIJH E IAO REGISTER NO AEIAR - ~12001 I

[

CENTRAL RECL PHASE ~-

~ 11 middott l l J

-shy -~ __r _______ __--shy- I

I

reg +

I fmiddotll

71 lt1

I

~ I

111~Srt ~ ~

Proj ect Title Wan C hai Development Phase 11 - Central-Wan C hai 13y1Jass at W~n C hai West (Contract No 11 K20 1208)- Tunnel Works

I~lfg glf ffr~famp~ -W-J- cfJtl~tT-~lli - ~ffflpoundi~ji (fltlt~J~ 11 K20 1208) ~ill I fpound

Environmental Permil No FEP 123642009D

[ ~

Figure la Location of the Project [sect la Ifi~Fifrr~

Bnuudu ofStmh 1r~a tl i 1J Itiioii~l

F cll l lf Rcclamatt OII hpound JnIIJJ

Tnm~ Rood 111 lunncl ]~yJ

t lti oadc Inn1~ Rltbullad amp iltp Road 1111111 bull bull wgtbull tl~~middot

~hp RuaJ on I leatccl 1ruuurc 1r~middot1Yn

t Iht li lUIC 11 plqlUCcl ha--rd (111 II~UI( 1 ell Jl plit Jfl(lll hlf h ulhcr l m trnnmcn1c11Pel ml c pp lliIIU)Il ~(l 11 ~- 1 71201h))

( f[~flJtf it~bullt fJi(Jl tq bull)1 ( ftt middot l-J 11 1-17 I02U ih) Jf la 11middot~ )EI51mtrrcrm~~~ FpoundP- 12J64t2oo9 o

shy

shy

1

Legend lffiiIJ

1 middot~ SI n BOUNDARY i-

VICTO~lt IIARIICUR

GDIJ1 OJlCl100 COl GC0412~7Cl1001C02

Project Tit le Wan C lwi Development Phase 11- Central-Wan Chai Bypass at Wan C hai West Figubullmiddote 1 b General Layout of the Pbullmiddotojcct (Contract No HY201208)- T unnel Worllts 1MJ 1 b I~~g 111iJFiJ~I~Jfisect~flJ ~fr~fm~=Wi - cppound95air~ili - ~ffgsectt~ (~~g~ljf HK20 1208)shy~iliifM

1Tillbull filHC tl~ prepared h I H-171 110161)1C(f ltm lrBurc IIK1l Appluauon h1r lunher Fmmlnmelllal l~rmu ( pphcat rcm rn Environmental Permit No FEP- 1 236~20090 t11 bullfll~ ppld(Jllcl middotJ~J I 1bullbull1 1 W n I-1 12CI16)il h illt~l l$1-IJlffPJID~liR FEP- 123642009D

Page 14: :Jn - EPD · 2016. 12. 14. · referenced ( 19) in Ax(-1) to EP2/H4 'C/09 11. 7. Environmental Permit Issued - Permit No.: EP-356/2009 issued to Civil Engineering and Development

( Environmental Permit No FEP- 123642009 D

J~Jff~f oJdfr~f-6~ FEP- 1236-12009 bull0

Table la

[Not used]

Table l b Exha ust Related Design Criteria of the Ccnt1middotal Ventilation Building and t he East Ventilation Building and its Vent Shaft (based on Table 311 of the WDIIampCWB EIA Report (Registe1middot No AElAR-1252008)

Minimum mid-dischabullmiddotge Cross-sectional Exit velocity Exhaust

height (meter above (m s1

)area of stack (m2) direction

ground)

Vertica l Central Venti lation 219 8 175

Bu ildi ng (CVB)

Incl ined 45 Vent shaft of the

degree up ard East Venti lation

94 8 1625 (discharge Bui lding

tO~ ards sea (EVB)

direction)

Notes This Table shall be read in conjunction ith Condition 213 and Figure I of this Perm it The vent shaft of CVB i11 be incorporated ~ ith in the CVB

The vent shaft of EVB il l be separated from the EVB and located at the eastern break at er of the Cause~ ay Bay T) phoon Shelter

- 12shy

--shy N

COVERED BY APPROVED CWB amp IECL EIA REPIJH E IAO REGISTER NO AEIAR - ~12001 I

[

CENTRAL RECL PHASE ~-

~ 11 middott l l J

-shy -~ __r _______ __--shy- I

I

reg +

I fmiddotll

71 lt1

I

~ I

111~Srt ~ ~

Proj ect Title Wan C hai Development Phase 11 - Central-Wan C hai 13y1Jass at W~n C hai West (Contract No 11 K20 1208)- Tunnel Works

I~lfg glf ffr~famp~ -W-J- cfJtl~tT-~lli - ~ffflpoundi~ji (fltlt~J~ 11 K20 1208) ~ill I fpound

Environmental Permil No FEP 123642009D

[ ~

Figure la Location of the Project [sect la Ifi~Fifrr~

Bnuudu ofStmh 1r~a tl i 1J Itiioii~l

F cll l lf Rcclamatt OII hpound JnIIJJ

Tnm~ Rood 111 lunncl ]~yJ

t lti oadc Inn1~ Rltbullad amp iltp Road 1111111 bull bull wgtbull tl~~middot

~hp RuaJ on I leatccl 1ruuurc 1r~middot1Yn

t Iht li lUIC 11 plqlUCcl ha--rd (111 II~UI( 1 ell Jl plit Jfl(lll hlf h ulhcr l m trnnmcn1c11Pel ml c pp lliIIU)Il ~(l 11 ~- 1 71201h))

( f[~flJtf it~bullt fJi(Jl tq bull)1 ( ftt middot l-J 11 1-17 I02U ih) Jf la 11middot~ )EI51mtrrcrm~~~ FpoundP- 12J64t2oo9 o

shy

shy

1

Legend lffiiIJ

1 middot~ SI n BOUNDARY i-

VICTO~lt IIARIICUR

GDIJ1 OJlCl100 COl GC0412~7Cl1001C02

Project Tit le Wan C lwi Development Phase 11- Central-Wan Chai Bypass at Wan C hai West Figubullmiddote 1 b General Layout of the Pbullmiddotojcct (Contract No HY201208)- T unnel Worllts 1MJ 1 b I~~g 111iJFiJ~I~Jfisect~flJ ~fr~fm~=Wi - cppound95air~ili - ~ffgsectt~ (~~g~ljf HK20 1208)shy~iliifM

1Tillbull filHC tl~ prepared h I H-171 110161)1C(f ltm lrBurc IIK1l Appluauon h1r lunher Fmmlnmelllal l~rmu ( pphcat rcm rn Environmental Permit No FEP- 1 236~20090 t11 bullfll~ ppld(Jllcl middotJ~J I 1bullbull1 1 W n I-1 12CI16)il h illt~l l$1-IJlffPJID~liR FEP- 123642009D

Page 15: :Jn - EPD · 2016. 12. 14. · referenced ( 19) in Ax(-1) to EP2/H4 'C/09 11. 7. Environmental Permit Issued - Permit No.: EP-356/2009 issued to Civil Engineering and Development

--shy N

COVERED BY APPROVED CWB amp IECL EIA REPIJH E IAO REGISTER NO AEIAR - ~12001 I

[

CENTRAL RECL PHASE ~-

~ 11 middott l l J

-shy -~ __r _______ __--shy- I

I

reg +

I fmiddotll

71 lt1

I

~ I

111~Srt ~ ~

Proj ect Title Wan C hai Development Phase 11 - Central-Wan C hai 13y1Jass at W~n C hai West (Contract No 11 K20 1208)- Tunnel Works

I~lfg glf ffr~famp~ -W-J- cfJtl~tT-~lli - ~ffflpoundi~ji (fltlt~J~ 11 K20 1208) ~ill I fpound

Environmental Permil No FEP 123642009D

[ ~

Figure la Location of the Project [sect la Ifi~Fifrr~

Bnuudu ofStmh 1r~a tl i 1J Itiioii~l

F cll l lf Rcclamatt OII hpound JnIIJJ

Tnm~ Rood 111 lunncl ]~yJ

t lti oadc Inn1~ Rltbullad amp iltp Road 1111111 bull bull wgtbull tl~~middot

~hp RuaJ on I leatccl 1ruuurc 1r~middot1Yn

t Iht li lUIC 11 plqlUCcl ha--rd (111 II~UI( 1 ell Jl plit Jfl(lll hlf h ulhcr l m trnnmcn1c11Pel ml c pp lliIIU)Il ~(l 11 ~- 1 71201h))

( f[~flJtf it~bullt fJi(Jl tq bull)1 ( ftt middot l-J 11 1-17 I02U ih) Jf la 11middot~ )EI51mtrrcrm~~~ FpoundP- 12J64t2oo9 o

shy

shy

1

Legend lffiiIJ

1 middot~ SI n BOUNDARY i-

VICTO~lt IIARIICUR

GDIJ1 OJlCl100 COl GC0412~7Cl1001C02

Project Tit le Wan C lwi Development Phase 11- Central-Wan Chai Bypass at Wan C hai West Figubullmiddote 1 b General Layout of the Pbullmiddotojcct (Contract No HY201208)- T unnel Worllts 1MJ 1 b I~~g 111iJFiJ~I~Jfisect~flJ ~fr~fm~=Wi - cppound95air~ili - ~ffgsectt~ (~~g~ljf HK20 1208)shy~iliifM

1Tillbull filHC tl~ prepared h I H-171 110161)1C(f ltm lrBurc IIK1l Appluauon h1r lunher Fmmlnmelllal l~rmu ( pphcat rcm rn Environmental Permit No FEP- 1 236~20090 t11 bullfll~ ppld(Jllcl middotJ~J I 1bullbull1 1 W n I-1 12CI16)il h illt~l l$1-IJlffPJID~liR FEP- 123642009D

Page 16: :Jn - EPD · 2016. 12. 14. · referenced ( 19) in Ax(-1) to EP2/H4 'C/09 11. 7. Environmental Permit Issued - Permit No.: EP-356/2009 issued to Civil Engineering and Development

1

Legend lffiiIJ

1 middot~ SI n BOUNDARY i-

VICTO~lt IIARIICUR

GDIJ1 OJlCl100 COl GC0412~7Cl1001C02

Project Tit le Wan C lwi Development Phase 11- Central-Wan Chai Bypass at Wan C hai West Figubullmiddote 1 b General Layout of the Pbullmiddotojcct (Contract No HY201208)- T unnel Worllts 1MJ 1 b I~~g 111iJFiJ~I~Jfisect~flJ ~fr~fm~=Wi - cppound95air~ili - ~ffgsectt~ (~~g~ljf HK20 1208)shy~iliifM

1Tillbull filHC tl~ prepared h I H-171 110161)1C(f ltm lrBurc IIK1l Appluauon h1r lunher Fmmlnmelllal l~rmu ( pphcat rcm rn Environmental Permit No FEP- 1 236~20090 t11 bullfll~ ppld(Jllcl middotJ~J I 1bullbull1 1 W n I-1 12CI16)il h illt~l l$1-IJlffPJID~liR FEP- 123642009D