JOB HAZARD ANALYSIS (JHA) DECLINATION WORK PLATFORM INSTALLATION Page 1 of 13 JHA Preparation Instructions: JHAs are to be prepared by the Supervisor or Group Manager in charge of the work, with work group member participation. The goal of preparing a JHA is for those responsible for or performing any work to review the risks and possible complications of that work and to consider ways of mitigating those risks and complications. A JHA shall be completed for all work executed. The JHA## is to be incremented when a procedure requires more than one JHA form. “Standing” should be marked if job or task is performed regularly and work group members are always the same individuals. Supervisors are responsible for getting the work group members sign off completed and a copy sent to the safety officer for each JHA. JHA Change Instructions: If changes to the content of this JHA are required, follow the KPNO ETS Engineering Change Process. The master copy of the document must be checked out of the Document Vault, an Engineering Change form must be completed, and the Revision Table (see last page) must be updated. Note that periodic reviews of this JHA that do not result in content changes require only entry of the review date and the name of the reviewer in the Revision Table; the document revision should not be advanced in this case. Tammie Lavoie 9 January 2018 Tammie Lavoie, Safety Manager Date JHA Number: 2100-AD-015-0082-JHA Rev: - Standing: N/A Date Completed: 19 December 2017 Title of Job or Task: Declination Work Platform Installation Location/Facility: KPNO 4 Meter Supervisor or Person Completing this JHA: Miranda Saucedo Person(s) Assisting with this JHA: Tammie Lavoie, Derek Guenther Recommended Personal Protective Equipment (PPE): select area above line to make entry Head Protection X Eye Protection X Hand and body Protection X Fall Protection Foot Protection X Hearing Protection X Respiratory Protection Special PPE: N/A Notes: *Hard hats must be used whenever someone is working above you or at your head height, or when working with suspended loads. ** Safety Shoes are mandatory in the area during construction, maintenance, heavy or complex work. Equipment or tools needed to perform the job: tab or select to make entry in next location, only use if not listed in procedure. N/A N/A N/A

Upload: others

Post on 11-Mar-2020

27 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: JOB HAZARD ANALYSIS (JHA) · HAZARD ANALYSIS Hazard Analysis Instructions: Complete the table below with the basic job steps, stating the hazards present and safe procedures or precautions

JOB HAZARD ANALYSIS (JHA)

DECLINATION WORK PLATFORM INSTALLATION Page 1 of 13

JHA Preparation Instructions: JHAs are to be prepared by the Supervisor or Group Manager in charge of the work, with work group member participation. The goal of preparing a JHA is for those responsible for or performing any work to review the risks and possible complications of that work and to consider ways of mitigating those risks and complications. A JHA shall be completed for all work executed. The JHA## is to be incremented when a procedure requires more than one JHA form. “Standing” should be marked if job or task is performed regularly and work group members are always the same individuals. Supervisors are responsible for getting the work group members sign off completed and a copy sent to the safety officer for each JHA. JHA Change Instructions: If changes to the content of this JHA are required, follow the KPNO ETS Engineering Change Process. The master copy of the document must be checked out of the Document Vault, an Engineering Change form must be completed, and the Revision Table (see last page) must be updated. Note that periodic reviews of this JHA that do not result in content changes require only entry of the review date and the name of the reviewer in the Revision Table; the document revision should not be advanced in this case.

Tammie Lavoie 9 January 2018 Tammie Lavoie, Safety Manager Date

JHA Number: 2100-AD-015-0082-JHA Rev: - Standing: N/A

Date Completed: 19 December 2017

Title of Job or Task: Declination Work Platform Installation

Location/Facility: KPNO 4 Meter

Supervisor or Person Completing this JHA:

Miranda Saucedo

Person(s) Assisting with this JHA:

Tammie Lavoie, Derek Guenther

Recommended Personal Protective Equipment (PPE): select area above line to make entry

Head Protection X Eye Protection X Hand and body Protection X Fall Protection Foot Protection X Hearing Protection X Respiratory Protection

Special PPE: N/A

Notes: *Hard hats must be used whenever someone is working above you or at your head height, or when working with suspended loads. ** Safety Shoes are mandatory in the area during construction, maintenance, heavy or complex work.

Equipment or tools needed to perform the job: tab or select to make entry in next location, only use if not listed

in procedure.

N/A N/A N/A

Page 2: JOB HAZARD ANALYSIS (JHA) · HAZARD ANALYSIS Hazard Analysis Instructions: Complete the table below with the basic job steps, stating the hazards present and safe procedures or precautions

2100-AD-015-0082-JHA PRINT DATE: 2018-01-09

DECLINATION WORK PLATFORM INSTALLATION Page 2 of 13

HAZARD ANALYSIS

Hazard Analysis Instructions: Complete the table below with the basic job steps, stating the hazards present and safe procedures or precautions to control the hazards for each step. Tab will move to next column; to add rows place cursor outside table on the right, and press ENTER. Basic Job Steps: Review the activity and divide it into basic steps. Hazards Present in Each Job Step: Identify the hazards or the possible danger present for each basic job step. Correct and Safe Procedures and Precautions: Decide what actions or procedures are necessary to control and minimize the hazards present.

Things to consider: Use designations in the “Hazards Present” column: Do employees know how to do the job? AX – Asphyxiation HS – Heat stress What are the hazards? Include people and equipment. BR – Burn Hazard R – Repetitive Motion How can injuries or accidents occur? CB – Caught Between SA – Struck Against How can injuries or accidents be prevented? CBY – Contacted By SB – Struck By Are there obvious unsafe conditions? CI – Caught In SE – Stored Energy Are special tools needed? CO – Caught On SL – Suspended Load Do people need personal protective equipment? CW – Contact With TH – Trip Hazard

How would we rescue people if something went wrong? E – Exposure to Chemicals, Noise, Vibration, Radiation

Do we have the equipment to rescue? EL – Electrical ER – Ergonomics FB – Fall to Below FH – Fire Hazard

Item No.

BASIC JOB STEPS HAZARDS PRESENT IN EACH JOB STEP

CORRECT AND SAFE PROCEDURES AND PRECAUTIONS

1. Drill and tap a ½-13 hole. E, EL, FB, SB, TH

-When working with power tools, workers may experience vibration and noise hazards. -Adequate hearing protection is required for noise levels over 85 dbA. -To minimize a tripping hazard, keep tools out of the working path as much as possible. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

Page 3: JOB HAZARD ANALYSIS (JHA) · HAZARD ANALYSIS Hazard Analysis Instructions: Complete the table below with the basic job steps, stating the hazards present and safe procedures or precautions

2100-AD-015-0082-JHA PRINT DATE: 2018-01-09

DECLINATION WORK PLATFORM INSTALLATION Page 3 of 13

Item No.

BASIC JOB STEPS HAZARDS PRESENT IN EACH JOB STEP

CORRECT AND SAFE PROCEDURES AND PRECAUTIONS

2.

Mount the Platform Support Assembly with one screw in the left end of the channel. Support the right end of the channel with the 5 ton dome crane. Position it so that it is level and its bottom edge is parallel with top of the center section.

FB, SB, SL, TH

-Frequent and periodic inspections must be performed by qualified personnel before the use of any crane is permitted. Appropriate documentation is required. -Examine straps for abnormal wear or structural damage. -Use caution when walking around straps on the equipment, as there may be a low head clearance. -Ensure load is strapped securely. -Keep hands and feet clear of the suspended load. -Confirm no workers are standing underneath load as it is being raised or lowered. -Examine platform support assembly for abnormal wear or structural damage. -Inspect screws for rust and wear to ensure a proper fit in the equipment. -To minimize a tripping hazard, keep platform support assembly out of the working path as much as possible. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

Page 4: JOB HAZARD ANALYSIS (JHA) · HAZARD ANALYSIS Hazard Analysis Instructions: Complete the table below with the basic job steps, stating the hazards present and safe procedures or precautions

2100-AD-015-0082-JHA PRINT DATE: 2018-01-09

DECLINATION WORK PLATFORM INSTALLATION Page 4 of 13

Item No.

BASIC JOB STEPS HAZARDS PRESENT IN EACH JOB STEP

CORRECT AND SAFE PROCEDURES AND PRECAUTIONS

3. Transfer-punch the two lower holes and match mark the 2 upper holes. Remove the 0270 from the telescope.

FB, SB, SL, TH

-Frequent and periodic inspections must be performed by qualified personnel before the use of any crane is permitted. Appropriate documentation is required. -Examine straps for abnormal wear or structural damage. -Use caution when walking around straps on the equipment, as there may be a low head clearance. -Ensure load is strapped securely. -Keep hands and feet clear of the suspended load. -Confirm no workers are standing underneath load as it is being raised or lowered. -Examine 0270 for abnormal wear or structural damage. -To minimize a tripping hazard, keep 0270 out of the working path as much as possible. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

Page 5: JOB HAZARD ANALYSIS (JHA) · HAZARD ANALYSIS Hazard Analysis Instructions: Complete the table below with the basic job steps, stating the hazards present and safe procedures or precautions

2100-AD-015-0082-JHA PRINT DATE: 2018-01-09

DECLINATION WORK PLATFORM INSTALLATION Page 5 of 13

Item No.

BASIC JOB STEPS HAZARDS PRESENT IN EACH JOB STEP

CORRECT AND SAFE PROCEDURES AND PRECAUTIONS

4. Lift the magnetic base drill using the 5 Ton dome crane. Drill and tap the remaining 4 holes in the center section.

E, EL, FB, SB, SL, TH

-Frequent and periodic inspections must be performed by qualified personnel before the use of any crane is permitted. Appropriate documentation is required. -Examine straps for abnormal wear or structural damage. -Use caution when walking around straps on the equipment, as there may be a low head clearance. -Ensure load is strapped securely. -Keep hands and feet clear of the suspended load. -Confirm no workers are standing underneath load as it is being raised or lowered. -When working with power tools, workers may experience vibration and noise hazards. -Adequate hearing protection is required for noise levels over 85 dbA. -To minimize a tripping hazard, keep remnants from holes that have been drilled off the floor. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

Page 6: JOB HAZARD ANALYSIS (JHA) · HAZARD ANALYSIS Hazard Analysis Instructions: Complete the table below with the basic job steps, stating the hazards present and safe procedures or precautions

2100-AD-015-0082-JHA PRINT DATE: 2018-01-09

DECLINATION WORK PLATFORM INSTALLATION Page 6 of 13

Item No.

BASIC JOB STEPS HAZARDS PRESENT IN EACH JOB STEP

CORRECT AND SAFE PROCEDURES AND PRECAUTIONS

5. Reinstall the 0270 on the telescope center section.

FB, SB, SL, TH

-Frequent and periodic inspections must be performed by qualified personnel before the use of any crane is permitted. Appropriate documentation is required. -Examine straps for abnormal wear or structural damage. -Use caution when walking around straps on the equipment, as there may be a low head clearance. -Ensure load is strapped securely. -Keep hands and feet clear of the suspended load. -Confirm no workers are standing underneath load as it is being raised or lowered. -Examine 0270 for abnormal wear or structural damage to ensure a proper fit in the equipment. -To minimize a tripping hazard, keep 0270 out of the working path as much as possible. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

Page 7: JOB HAZARD ANALYSIS (JHA) · HAZARD ANALYSIS Hazard Analysis Instructions: Complete the table below with the basic job steps, stating the hazards present and safe procedures or precautions

2100-AD-015-0082-JHA PRINT DATE: 2018-01-09

DECLINATION WORK PLATFORM INSTALLATION Page 7 of 13

Item No.

BASIC JOB STEPS HAZARDS PRESENT IN EACH JOB STEP

CORRECT AND SAFE PROCEDURES AND PRECAUTIONS

6. Install the South Support Leg (2100-ME-040-0283) that is shown in Figure 3 onto the 2100-ME-040-0271 as shown in Figure 4.

FB, SB, SL, TH

-Frequent and periodic inspections must be performed by qualified personnel before the use of any crane is permitted. Appropriate documentation is required. -Examine straps for abnormal wear or structural damage. -Use caution when walking around straps on the equipment, as there may be a low head clearance. -Ensure load is strapped securely. -Keep hands and feet clear of the suspended load. -Confirm no workers are standing underneath load as it is being raised or lowered. -Examine 0283 and 0271 for abnormal wear or structural damage to ensure a proper fit in the equipment. -To minimize a tripping hazard, keep 0283 and 0271 out of the working path as much as possible. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

Page 8: JOB HAZARD ANALYSIS (JHA) · HAZARD ANALYSIS Hazard Analysis Instructions: Complete the table below with the basic job steps, stating the hazards present and safe procedures or precautions

2100-AD-015-0082-JHA PRINT DATE: 2018-01-09

DECLINATION WORK PLATFORM INSTALLATION Page 8 of 13

Item No.

BASIC JOB STEPS HAZARDS PRESENT IN EACH JOB STEP

CORRECT AND SAFE PROCEDURES AND PRECAUTIONS

7.

Choker a 5 ft. sling around the top ring on the ladder portion of 0271. Lift it over the small platform on the cass ramp. Roughly center it on the small platform.

FB, SB, SL, TH

-Frequent and periodic inspections must be performed by qualified personnel before the use of any crane is permitted. Appropriate documentation is required. -Examine straps for abnormal wear or structural damage. -Use caution when walking around straps on the equipment, as there may be a low head clearance. -Ensure load is strapped securely. -Keep hands and feet clear of the suspended load. -Confirm no workers are standing underneath load as it is being raised or lowered. -Examine 0271 for abnormal wear or structural damage to ensure a proper fit in the equipment. -To minimize a tripping hazard, keep 0271 out of the working path as much as possible. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

8.

Transfer punch the 3 mounting holes on the cass ramp. Move the 0271 away from the platform and drill three ½ in clearance holes. Counter sink the holes to accept flat head bolts.

E, EL, FB, SB, TH

-When working with power tools, workers may experience vibration and noise hazards. -Adequate hearing protection is required for noise levels over 85 dbA. -To minimize a tripping hazard, keep tools out of the working path as much as possible. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

9. Mount the 0271 assembly on to the platform and adjust the leveling screws until the platform is level.

FB, SB, TH

-Inspect 0271 for abnormal wear or structural damage to ensure a proper fit in the equipment. -Inspect screws for rust and wear to ensure a proper fit in the equipment. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

Page 9: JOB HAZARD ANALYSIS (JHA) · HAZARD ANALYSIS Hazard Analysis Instructions: Complete the table below with the basic job steps, stating the hazards present and safe procedures or precautions

2100-AD-015-0082-JHA PRINT DATE: 2018-01-09

DECLINATION WORK PLATFORM INSTALLATION Page 9 of 13

Item No.

BASIC JOB STEPS HAZARDS PRESENT IN EACH JOB STEP

CORRECT AND SAFE PROCEDURES AND PRECAUTIONS

10.

Lift the Main Frame (2100-ME-040-0296) as shown in Figure 5 with the 5 Ton dome crane. Position the frame over the 2 ends just installed.

FB, SB, SL, TH

-Frequent and periodic inspections must be performed by qualified personnel before the use of any crane is permitted. Appropriate documentation is required. -Examine straps for abnormal wear or structural damage. -Use caution when walking around straps on the equipment, as there may be a low head clearance. -Ensure load is strapped securely. -Keep hands and feet clear of the suspended load. -Confirm no workers are standing underneath load as it is being raised or lowered. -Examine 0296 for abnormal wear or structural damage. -To minimize a tripping hazard, keep 0296 out of the working path as much as possible. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

11. Install 1 bolt in either end. Install the “L” Angle brackets (2100-ME-040-0288).

FB, SB, TH

-Inspect brackets for abnormal wear or structural damage to ensure a proper fit in the equipment. -Inspect screws for rust and wear to ensure a proper fit in the equipment. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

Page 10: JOB HAZARD ANALYSIS (JHA) · HAZARD ANALYSIS Hazard Analysis Instructions: Complete the table below with the basic job steps, stating the hazards present and safe procedures or precautions

2100-AD-015-0082-JHA PRINT DATE: 2018-01-09

DECLINATION WORK PLATFORM INSTALLATION Page 10 of 13

Item No.

BASIC JOB STEPS HAZARDS PRESENT IN EACH JOB STEP

CORRECT AND SAFE PROCEDURES AND PRECAUTIONS

12. The 0296 may have to be lifted to drill and tap the ½-13 in mounting holes.

E, EL, FB, SB, SL, TH

-Frequent and periodic inspections must be performed by qualified personnel before the use of any crane is permitted. Appropriate documentation is required. -Examine straps for abnormal wear or structural damage. -Use caution when walking around straps on the equipment, as there may be a low head clearance. -Ensure load is strapped securely. -Keep hands and feet clear of the suspended load. -Confirm no workers are standing underneath load as it is being raised or lowered. -Examine 0296 for abnormal wear or structural damage. -Inspect bolts for rust and wear to ensure a proper fit in the equipment. -Adequate hearing protection is required for noise levels over 85 dbA. -To minimize a tripping hazard, keep 0296 out of the working path as much as possible. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

13.

Lower the 0296 back onto the end frames. Loosely install the mounting bolts for both ends. Once all the bolts are in the mounting holes, the bolts can be tightened.

FB, SB, TH

-Inspect 0296 for abnormal wear or structural damage to ensure a proper fit in the equipment. -Inspect bolts for rust and wear to ensure a proper fit in the equipment. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

14. Install the precut plywood sheets for the platform floor.

FB, SB, TH

-Inspect plywood sheets for abnormal wear or structural damage to ensure a proper fit in the equipment. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

Page 11: JOB HAZARD ANALYSIS (JHA) · HAZARD ANALYSIS Hazard Analysis Instructions: Complete the table below with the basic job steps, stating the hazards present and safe procedures or precautions

2100-AD-015-0082-JHA PRINT DATE: 2018-01-09

DECLINATION WORK PLATFORM INSTALLATION Page 11 of 13

Item No.

BASIC JOB STEPS HAZARDS PRESENT IN EACH JOB STEP

CORRECT AND SAFE PROCEDURES AND PRECAUTIONS

15. Assemble the West Handrail per Figure 6. FB, SB, TH

-Inspect handrail for abnormal wear or structural damage to ensure a proper fit in the equipment. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

16.

Lift the hand rail assembly over the platform using the 5 Ton dome crane. Center it on the West rail and transfer-punch the mounting holes.

FB, SB, SL, TH

-Frequent and periodic inspections must be performed by qualified personnel before the use of any crane is permitted. Appropriate documentation is required. -Examine straps for abnormal wear or structural damage. -Use caution when walking around straps on the equipment, as there may be a low head clearance. -Ensure load is strapped securely. -Keep hands and feet clear of the suspended load. -Confirm no workers are standing underneath load as it is being raised or lowered. -Examine hand rail assembly for abnormal wear or structural damage. -To minimize a tripping hazard, keep hand rail assembly out of the working path as much as possible. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

17. Move the handrails to the West to allow clearance to drill the mounting holes.

FB, SB, TH

-Inspect handrails for abnormal wear or structural damage to ensure a proper fit in the equipment. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

Page 12: JOB HAZARD ANALYSIS (JHA) · HAZARD ANALYSIS Hazard Analysis Instructions: Complete the table below with the basic job steps, stating the hazards present and safe procedures or precautions

2100-AD-015-0082-JHA PRINT DATE: 2018-01-09

DECLINATION WORK PLATFORM INSTALLATION Page 12 of 13

Item No.

BASIC JOB STEPS HAZARDS PRESENT IN EACH JOB STEP

CORRECT AND SAFE PROCEDURES AND PRECAUTIONS

18. Drill the holes with a 15/32 in drill. Mount the rail using McMaster-Carr 94077A205 self-tapping screws.

E, EL, FB, SB, TH

-Inspect screws for rust and wear to ensure a proper fit in the equipment. -When working with power tools, workers may experience vibration and noise hazards. -Adequate hearing protection is required for noise levels over 85 dbA. -To minimize a tripping hazard, keep tools out of the working path as much as possible. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

19. Assemble the South handrail with the West vertical being 38-7/8 in long and the East vertical being 39-3/8 in long.

FB, SB, TH

-Inspect handrail for abnormal wear or structural damage to ensure a proper fit in the equipment. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

20. Attach the McMaster-Carr self-closing door (4073K15) as shown in Figure 7.

FB, SB, TH

-Inspect self-closing door for abnormal wear or structural damage to ensure a proper fit in the equipment. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

21. Drill the 2 holes in the rail with 15/32 in drill. Drill the 4 holes in the plywood with a ¼ pilot drill.

E, EL, FB, SB, TH

-When working with power tools, workers may experience vibration and noise hazards. -Adequate hearing protection is required for noise levels over 85 dbA. -To minimize a tripping hazard, keep tools out of the working path as much as possible. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

22. Install (4) 3/8 in lag screws in the plywood and two 94077A205 self-tapping screws in the rail.

FB, SB, TH

-Inspect screws for rust and wear to ensure a proper fit in the equipment. -Inspect PPE before and after each use. Report any abnormalities or imperfections to the job supervisor.

Page 13: JOB HAZARD ANALYSIS (JHA) · HAZARD ANALYSIS Hazard Analysis Instructions: Complete the table below with the basic job steps, stating the hazards present and safe procedures or precautions

2100-AD-015-0082-JHA PRINT DATE: 2018-01-09

DECLINATION WORK PLATFORM INSTALLATION Page 13 of 13

REVISION TABLE

Rev

Date Approved

Remarks and/or Change Details

Reason for Change

Name

- Feb. 17, 2015 Initiated

WORK GROUP MEMBERS FOR THIS JHA

I understand & will adhere to the steps, hazards & controls as described in this JHA. I understand that performing steps out

of sequence may pose hazards that have not been evaluated, nor authorized. I will contact my supervisor prior to continuing

work, if the scope of work changes or new hazards are introduced. I understand I have the authority and responsibility to

stop work if I believe it to be unsafe.

N° NAME (print) SIGNATURE DATE

1

2

3

4

5

6

7

8

9

10

11

12

SUPERVISOR IN CHARGE

I have reviewed the steps, hazards & controls described in this JHA with all workers listed above and authorize them to perform the work. Workers are qualified (i.e. licensed or certified, as appropriate, & in full compliance with NOAO training requirement(s) to perform this activity.

N° NAME SIGNATURE DATE

1