job specifications for butane and propane storage tanks - r
TRANSCRIPT
Iranian Gas Engineering & Development Co.
Bid Boland Gas Treating Plant II
Part B: Pipe Lines & Mahshahr Facilities
Tehran Jonoob Tech. & Construction Company
Document Title: Page 1 of 22 Document Number:
Proj. No. Field Unit Disc. Type Seq. Rev. 38687901 MHS E502 ME SP 001 03 1b
Steiner-Prematechnik-Gastec GmbH
E-mail: [email protected]
IGED EIED Owner MC
JOB SPECIFICATIONS
FOR
BUTANE
AND
PROPANE STORAGE TANKS
03 04 .02. 2009 GM MG SG Issued for Approval 02 03 .12. 2008 GM MG SG Issued for Approval 01 30 .10. 2008 GM MG SG Issued for Approval 00 08 .10. 2008 GM MG SG Issued for Approval Rev. Date Prepared Checked Approved Purpose
Iranian Gas Engineering & Development Co.
Bid Boland Gas Treating Plant II
Part B: Pipe Lines & Mahshahr Facilities
Tehran Jonoob Tech. & Construction Company
Document Title: Page 2 of 22 Document Number:
Proj. No. Field Unit Disc. Type Seq. Rev. 38687901 MHS E502 ME SP 001 03 1b
Steiner-Prematechnik-Gastec GmbH
E-mail: [email protected]
IGED EIED Owner MC
C O N T E N T
1. GENERALS.
2. APLICABILE CODES and STANDARDS.
3. SYSTEM DESCRIPTION.
4. FABRICATOR’S OBLIGATIONS.
Iranian Gas Engineering & Development Co.
Bid Boland Gas Treating Plant II
Part B: Pipe Lines & Mahshahr Facilities
Tehran Jonoob Tech. & Construction Company
Document Title: Page 3 of 22 Document Number:
Proj. No. Field Unit Disc. Type Seq. Rev. 38687901 MHS E502 ME SP 001 03 1b
Steiner-Prematechnik-Gastec GmbH
E-mail: [email protected]
IGED EIED Owner MC
REVISION SHEET
Sheet No. Revisions Sheet
No. Revisions
1 00 01 02 03 2 00 01 02 03 3 00 01 02 03 4 00 01 02 03 5 00 01 02 03 6 00 01 02 03 7 00 01 02 03 8 00 01 02 03 9 00 01 02 03
10 00 01 02 03 11 00 01 02 03 12 00 01 02 03 13 00 01 02 03 14 00 01 02 03 15 00 01 02 03 16 00 01 02 03 17 01 02 03 18 01 02 03 19 01 02 03 20 02 03 21 03 22 03
Iranian Gas Engineering & Development Co.
Bid Boland Gas Treating Plant II
Part B: Pipe Lines & Mahshahr Facilities
Tehran Jonoob Tech. & Construction Company
Document Title: Page 4 of 22 Document Number:
Proj. No. Field Unit Disc. Type Seq. Rev. 38687901 MHS E502 ME SP 001 03 1b
Steiner-Prematechnik-Gastec GmbH
E-mail: [email protected]
IGED EIED Owner MC
1. GENERALS
This specification cover minimum requirements which will be applied during the work –
shop drawings, procurement, fabrication and erection stages.
3
3 3 1.1. DEFINITION
PROJECT: Bidboland Gas Treating Plant II, Part B, Pipe Lines & Mahshahr Facilities.
SPG: Steiner-Prematechnik-Gastec GmbH. IGED: Iranian Gas Engineering & Development Co. TJ: Tehran Jonoob Technical & Construction Co. OWNER/CLIENT: IGED CONTRACTOR: TJ MC: Managing Contractor (EIED) ENGINEER: SPG VENDOR: Shall mean any CONTRACTOR'S and/or Subcontractor's suppliers of
materials, and vendor representative that maybe required to assist TJ for the installation, commissioning and start-up, performance tests, etc of the PROJECT.
SUBCONTRACTOR: means any company or person subcontracted performance of any part
of the work. Subcontractors include Vendors and Suppliers. The SPG Main Subcontractors are: DCMC: Design and Construction Management Co. CE: Canadoil Engineering PTE Ltd, Singapore.
3 1.2. Design, materials, construction and testing shall be complied with following documents.
When conflicting or interpretations of documents, the order of precedence of documents
shall be as follow :
1.2.1. Data Sheets ;
Iranian Gas Engineering & Development Co.
Bid Boland Gas Treating Plant II
Part B: Pipe Lines & Mahshahr Facilities
Tehran Jonoob Tech. & Construction Company
Document Title: Page 5 of 22 Document Number:
Proj. No. Field Unit Disc. Type Seq. Rev. 38687901 MHS E502 ME SP 001 03 1b
Steiner-Prematechnik-Gastec GmbH
E-mail: [email protected]
IGED EIED Owner MC
1.2.2. This Job Specifications. The discrepancies between IPS and International Standards
will be finalized by manufacturer ;
1.2.3. IPS ;
1.2.4. International STDs .
1.3. This specification will be applied to tanks for storing butane and propane, as a
refrigerated liquid.
Each tank will be a double walled designed and will consist of low temperature steel
inner container, a carbon steel outer tank and a carbon steel domed roof with an
insulated aluminium deck over the inner container, suspended from the domed roof.
The annular space, between the inner an outer tank, will be approximately 1m wide, and
will be filled with perlite.
The suspended deck will be insulated with fiberglass blankets.
The tank bottom will be insulated with cellular glass load bearing black insulation
designed to support the tank and product weight.
The inner tank will be designed and constructed in accordance with the requirements of
API 620 Appendix R.
The inner tank will be “OPEN TOP”.
The space under dome roof supporting structure of the outer tank contain gas produced
by stored products. 3
Iranian Gas Engineering & Development Co.
Bid Boland Gas Treating Plant II
Part B: Pipe Lines & Mahshahr Facilities
Tehran Jonoob Tech. & Construction Company
Document Title: Page 6 of 22 Document Number:
Proj. No. Field Unit Disc. Type Seq. Rev. 38687901 MHS E502 ME SP 001 03 1b
Steiner-Prematechnik-Gastec GmbH
E-mail: [email protected]
IGED EIED Owner MC
The calculation of tanks will be confirmed by the designer of work – shop drawings,
taking into consideration the seismic load and the wind load, according to IPS, location
and specific conditions.
The tank insulation system will be designed to limit the tank boil to rate no greater then
0,06% for propane and 0,04% for butane by volume per day of the tank content at an
ambient temperature, with the tank full, and in steady – state conditions.
Tank instrumentation provided on basic design consist of :
- MHS – E – 502 – ME – DS – 001, Rev.02;
- MHS – E – 502 – ME – DS – 002, Rev.02.
- Temperature indicator (N 15) ;
- Pressure indicator (N 17) ;
- Temperature indicator for sensing the cool – down (N 19) ;
- Skin type temperature indicator (N 21)
- Level indicator (N 20 A, B) ;
- Level detection in annular space (N 22).
Roof platforms will be provided to have sufficient space around the piping and instruments on roof.
Stairways and emergency escape ladder will be provided to access to roof platforms.
Design data and specification of ladder, platform and stairways will be specified during the detail Engineering stage.
3
Exposed portion of carbon steel surface of tank shell and roof will be blasted and painted.
Iranian Gas Engineering & Development Co.
Bid Boland Gas Treating Plant II
Part B: Pipe Lines & Mahshahr Facilities
Tehran Jonoob Tech. & Construction Company
Document Title: Page 7 of 22 Document Number:
Proj. No. Field Unit Disc. Type Seq. Rev. 38687901 MHS E502 ME SP 001 03 1b
Steiner-Prematechnik-Gastec GmbH
E-mail: [email protected]
IGED EIED Owner MC
A settlement monitoring system will be provided to measure and record inner and outer tanks settlement during construction and hydro-test.
This construction monitoring will form the basis of continued periodic monitoring once the tanks are in operation.
2. APLICABLE CODES and STANDARDS
The applicable code and standards include :
I. API 620 ;
II. NFPA 59 ;
III. Any codes and standards specifically mentioned in any documents or attachments to
the basic and detail design.
IV. Those codes and standards of the following standards organizations and other
generally accepted practices, methods and techniques employed by the international
liquefied gas industry.
AGA – American Gas Association ;
AISC – American Institute of Steel Construction ;
ANSI – American National Standard Institute ;
API – American Petroleum Institute ;
ASME – American Society for Mechanical Engineer ;
ASTM – American Society for Testing and Materials ;
AWS – American Welding Society ;
Iranian Gas Engineering & Development Co.
Bid Boland Gas Treating Plant II
Part B: Pipe Lines & Mahshahr Facilities
Tehran Jonoob Tech. & Construction Company
Document Title: Page 8 of 22 Document Number:
Proj. No. Field Unit Disc. Type Seq. Rev. 38687901 MHS E502 ME SP 001 03 1b
Steiner-Prematechnik-Gastec GmbH
E-mail: [email protected]
IGED EIED Owner MC
NFPA – National Fire Protection Association ;
SSPC – Steel Structure Painting Council ;
NACE – National Association of Corrosion Engineer ;
IPS – Iranian Petroleum Standards.
3. SYSTEM DESCRIPTION
3.1. This specification serve as a guide line and is intended to be used for design,
procurement and erection of storage tanks for BUTANE & PROPANE, designed
according to API 620.
3.2. Implementation of this specification requires an organization operating under quality
assurance programs in order to meet relevant requirements of API 620, API 650, and all
other standards mentioned on basic design.
3.3. Outer tanks are not designed to support external pressure (internal vacuum) and the
maximum internal pressure design is limited at 15 psig. Inner tank is designed as per
API 620 including insulation load.
3 3.4. For storage tank design conditions and vessel configuration, see DATA SHEETS :
MHS – E – 502 – ME – DS – 001 – Rev.03 for PROPANE;
MHS – E – 502 – ME – DS – 002 – Rev. 03 for BUTANE,
which describe :
3.4.1. The services conditions and design requirements.
Iranian Gas Engineering & Development Co.
Bid Boland Gas Treating Plant II
Part B: Pipe Lines & Mahshahr Facilities
Tehran Jonoob Tech. & Construction Company
Document Title: Page 9 of 22 Document Number:
Proj. No. Field Unit Disc. Type Seq. Rev. 38687901 MHS E502 ME SP 001 03 1b
Steiner-Prematechnik-Gastec GmbH
E-mail: [email protected]
IGED EIED Owner MC
3.4.2. Maximum design liquid level in inner tank and specific gravity of the liquid to be
stored.
3.4.3. Materials of construction of storage tanks as required by the service conditions.
3.4.4. Corrosion allowances.
3.4.5. Necessary insulation materials for annular space, tanks bottom and suspended deck.
3.4.6. Testing requirements.
3.5. The tanks fabricator shall have the full responsibility of mechanical tank’s design, for
shop drawings, fabrication and erection, including tanks foundations, according to API
620 and associated standards.
3.6. The tanks fabricator responsibilities include :
3.6.1. Detailed engineering design.
3.6.2. Equipment procurement services.
3.6.3. Mobilization and site establishment.
3.6.4. Testing.
3.6.5. Pre-commissioning.
3.6.6. Final acceptance.
Iranian Gas Engineering & Development Co.
Bid Boland Gas Treating Plant II
Part B: Pipe Lines & Mahshahr Facilities
Tehran Jonoob Tech. & Construction Company
Document Title: Page 10 of 22 Document Number:
Proj. No. Field Unit Disc. Type Seq. Rev. 38687901 MHS E502 ME SP 001 03 1b
Steiner-Prematechnik-Gastec GmbH
E-mail: [email protected]
IGED EIED Owner MC
3.7. The tanks fabricator shall provide, as a minimum, the following services :
3.7.1. Developing of shop drawings, sufficient for procurement of materials, fabrication,
installation, testing, pre-commissioning.
3.7.2. Preparation of engineering material requisitions and purchase requisitions.
3.7.3. Technical evaluation of all equipment.
3.7.4. Development of acceptance test requirements.
3.7.5. Development and implementation of plan for witnessing of factory acceptance tests.
3.7.6. Preparation of mechanical data book.
3.8. The tank fabricator shall be responsible for developing of the following drawings and
specifications for civil and insulation works.
3.8.1. Foundation design basis.
3.8.2. Foundation design.
3.8.3. Material selection guide.
3.8.4. Painting and coating specifications.
3.8.5. Insulation system specifications.
3.9. The tank fabricator shall produce a project procurement plan, comprising, but not
limited to :
3.9.1. Inspection.
Iranian Gas Engineering & Development Co.
Bid Boland Gas Treating Plant II
Part B: Pipe Lines & Mahshahr Facilities
Tehran Jonoob Tech. & Construction Company
Document Title: Page 11 of 22 Document Number:
Proj. No. Field Unit Disc. Type Seq. Rev. 38687901 MHS E502 ME SP 001 03 1b
Steiner-Prematechnik-Gastec GmbH
E-mail: [email protected]
IGED EIED Owner MC
3.9.2. Technical requirements compliance.
3.9.3. Material control, marking and certification.
3.9.4. Packing, expediting, transportation, handling and storage.
3.9.5. Warranties and guaranties.
3.10. The tank fabricator shall produce a detailed construction plan. The plan will provide a
summary procedures, plans and execution, methodologies to be used by fabricator for all
management, controls, labour, supervision, consumables, tools, erection, equipment
necessary to construct, mechanically complete, test and pre-commissioning of tanks.
The project construction plan will address the followings :
3.10.1. Construction procedures.
3.10.2. Construction methodologies.
3.10.3. Temporary facilities procedure.
3.10.4. Punch lists procedure.
3.10.5. Pre-commissioning procedure.
4. FABRICATOR’S OBLIGATIONS
4.1. DESIGN
4.1.1. Supply of shop design drawings, calculation and supporting data, based on data
sheets approved by CONTRACTOR and API 620 & 650, for tanks and
appurtenances.
Iranian Gas Engineering & Development Co.
Bid Boland Gas Treating Plant II
Part B: Pipe Lines & Mahshahr Facilities
Tehran Jonoob Tech. & Construction Company
Document Title: Page 12 of 22 Document Number:
Proj. No. Field Unit Disc. Type Seq. Rev. 38687901 MHS E502 ME SP 001 03 1b
Steiner-Prematechnik-Gastec GmbH
E-mail: [email protected]
IGED EIED Owner MC
4.1.2. Supply of design tank foundation which must meet the requirements of AIC Code
and requirements for seismic events. Foundation calculations shall give details
referring to materials, design, parameters, codes and specifications used. Settlement
criteria and predictions shall be provided for foundations.
4.1.3. Supply of GENERAL ARRANGEMENT DRAWINGS showing minimum :
• Overall dimensions and relative location;
• True orientation of nozzles;
• Nozzle table listing size and rating of the above connections;
• Estimated operating weight;
• Erection weight;
• Acceptable loads and moments on flanges to which other items will be
connected.
• Foundation loading forces (static and dynamic);
• Location of internals (suspended deck, supports, rings, beams, brackets,
clips, etc.);
• Location and size of anchor bolts;
• Weld informations.
Iranian Gas Engineering & Development Co.
Bid Boland Gas Treating Plant II
Part B: Pipe Lines & Mahshahr Facilities
Tehran Jonoob Tech. & Construction Company
Document Title: Page 13 of 22 Document Number:
Proj. No. Field Unit Disc. Type Seq. Rev. 38687901 MHS E502 ME SP 001 03 1b
Steiner-Prematechnik-Gastec GmbH
E-mail: [email protected]
IGED EIED Owner MC
4.1.4. Supply of CROSS SECTIONAL DRAWINGS which indicate parts description
and show any relevant informations which cannot be clearly shown on the General
Arrangement Drawings.
4.1.5. Supply of Detailed Drawings of each part of tank, which must include plate layout,
welding details and :
• Overall size;
• Materials thickness;
• Location of longitudinal and circumferential seams of shell;
• Welding details for other seams;
• Extended and type of NDT;
• Material’s quality;
• Foundation reinforcement details;
• Foundation bolt location and penetration details for outer tank, including
number and size detail.
4.1.6. Supply of FABRICATION and CONSTRUCTION DRAWINGS, showing fully
dimensioned component parts of items being necessary to complete the work.
4.1.7. Supply of TECHNICAL DATA for insulation materials venting valves, hatch
catch, indicated on basic design;
4.1.8. Supply BILL of MATERIALS;
Iranian Gas Engineering & Development Co.
Bid Boland Gas Treating Plant II
Part B: Pipe Lines & Mahshahr Facilities
Tehran Jonoob Tech. & Construction Company
Document Title: Page 14 of 22 Document Number:
Proj. No. Field Unit Disc. Type Seq. Rev. 38687901 MHS E502 ME SP 001 03 1b
Steiner-Prematechnik-Gastec GmbH
E-mail: [email protected]
IGED EIED Owner MC
4.1.9. Supply of PAINT PROCEDURE;
4.2. FABRICATION
4.2.1. GENERAL
4.2.1.1. Prior to fabrication, must be submitted a fabrication procedure, including
supplier’s QA program which shall control a combination of design,
materials, preparation, fabrication, inspection, testing, cleaning, painting,
packing and shipping , that has to be done correctly to ensure the production
of acceptable finished product.
4.2.1.2. The method of fabrication must respect the minimum requirements described
bellow :
• All materials which are under fabricator’s scope of supply shall be accompanied
with proper, will test certificate (EN 0204 3.1);
• The profile of shell plate shall be accurate within a tolerance of 1,5mm in length
and +0,8mm in width. Negative tolerance will not be acceptable, in addition. The
diagonals measured across the rectangle, formed by scrubbing lines 50mm from
each edge, shall not differ by more than 2mm. For roof and bottom plates with
lapped seams, tolerance according to API 620 are acceptable.
• All shell plates shall be rolled to the correct tank curvature and all formed plates
shall be match marked with paint on the concave side with number as shown on
erection drawings. All rolled plates shall be stacked properly to retain the shape
and shall be handled carefully to avoid damages during transport.
• All dome roof plates shall be pressed to the correct curvature.
Iranian Gas Engineering & Development Co.
Bid Boland Gas Treating Plant II
Part B: Pipe Lines & Mahshahr Facilities
Tehran Jonoob Tech. & Construction Company
Document Title: Page 15 of 22 Document Number:
Proj. No. Field Unit Disc. Type Seq. Rev. 38687901 MHS E502 ME SP 001 03 1b
Steiner-Prematechnik-Gastec GmbH
E-mail: [email protected]
IGED EIED Owner MC
• Edges shall be mechanical cutting or machined.
• All materials will be subject of procedure for control, agregation and traseability
from receipt at the shop through processing and final assembly.
4.2.2. WELDING
4.2.2.1. All welding of tank plates, steel framing, structural, attachments, nozzles,
etc., shall carried out by qualified welders.
4.2.2.2. The qualification of welders will be based on :
• Welding Procedure Specification (WPS);
• Welder Performance Qualification Test (WPQT).
3 4.2.2.3. Before start of welding, the fabricator must submit to CONTRACTOR a
copy of :
3 • Welder Performance Qualification Records;
• NDE Personnel Certifications;
• The detail requirement regarding material certification for weld filler
material will be submitted during the detail design stage.
4.2.2.4. Suggested type of welding are as follow :
• Double beveled shell plates shall be prepared for seams which will be executed
on site. The site welds will be butt-weld from both sides of plate;
Iranian Gas Engineering & Development Co.
Bid Boland Gas Treating Plant II
Part B: Pipe Lines & Mahshahr Facilities
Tehran Jonoob Tech. & Construction Company
Document Title: Page 16 of 22 Document Number:
Proj. No. Field Unit Disc. Type Seq. Rev. 38687901 MHS E502 ME SP 001 03 1b
Steiner-Prematechnik-Gastec GmbH
E-mail: [email protected]
IGED EIED Owner MC
• Radial seams for annular plates of bottoms shall be butt-welded and shall have
complete penetration for the full thickness of annular plates, with a backing strip
of at least 5mm thickness;
• Lap joints on rectangular and annular plates, for bottoms, shall be full fillet-
welded on the top side only;
• Seams for steel structure, erected inside or outside of tanks, must be of seal
welded type.
4.2.2.5. Sequence of welding, employed both for tank welding and final welding of
the bottom, shell, roof plate, structure and appurtenances shall be arranged to
minimize the distortion due to weld shrinkage.
4.2.2.6. Electrodes for welding shall be basic or low hydrogen type.
4.2.3. SHOP ACCEPTANCE TEST
4.2.3.1. Performing of inspection and testing in accordance with API 620
requirements, as applicable, for part of tanks produced on shop.
4.2.3.2. Issue the Quality Control Documents.
4.2.3.3. Provide for OWNER’S inspector, the test location, equipment,
instrumentation of certified accuracy and any supplementary information
necessary to fully execute the shop tests.
Iranian Gas Engineering & Development Co.
Bid Boland Gas Treating Plant II
Part B: Pipe Lines & Mahshahr Facilities
Tehran Jonoob Tech. & Construction Company
Document Title: Page 17 of 22 Document Number:
Proj. No. Field Unit Disc. Type Seq. Rev. 38687901 MHS E502 ME SP 001 03 1b
Steiner-Prematechnik-Gastec GmbH
E-mail: [email protected]
IGED EIED Owner MC
4.2.4. PACKING and SHIPPING on SITE
• Mode and Method of packing and shipping on site are to be mutual agreed on by
fabricator and CONTRACTOR prior to fabrication and delivery of the tank. At final
destination, the fabricator will inspect the shipment, as necessary, to ensure that
received items have not been damaged during shipment and that required items and
supporting documents have been received.
3
4.3. ERECTION
4.3.1. Issuing of CONSTRUCTION PROCEDURE, comprising but not limited as :
• Site preparation;
• Temporary facilities;
• Method statements of work;
• Site materials handling;
• Erection procedure;
• Site welding procedure;
• NDE applicable;
• Construction utilities.
4.3.2. Erection of tanks, welding, NDE of works done on site.
4.3.3. Check of tolerances, which will be according to API 620 but minimum as follow :
Iranian Gas Engineering & Development Co.
Bid Boland Gas Treating Plant II
Part B: Pipe Lines & Mahshahr Facilities
Tehran Jonoob Tech. & Construction Company
Document Title: Page 18 of 22 Document Number:
Proj. No. Field Unit Disc. Type Seq. Rev. 38687901 MHS E502 ME SP 001 03 1b
Steiner-Prematechnik-Gastec GmbH
E-mail: [email protected]
IGED EIED Owner MC
4.3.3.1. Shell tolerances.
• Before welding of shell plates, a checking should be made to ensure that the
alignment of the plates and the width of the gaps between them are correct, if
there are any inaccuracies beside of tolerances described on standards the
correction action will be done. After completion, the shell not be out of vertical
line by max. 25mm.
After welding of bottom course, the distance from tank center to any two points
of the inside of the tank shell plates at tank bottom shall not differ by more than
1mm per meter and shall never exceed 25mm. The local deviation from design
form shall not exceed the followings when measured over a gauge length 1m :
3
- Plates up to and including 25mm thickness = 10mm;
- Plates over 25mm thickness = 8mm.
4.3.3.2. Roof tolerances.
• The differences in the gap between the shell and the periphery of the roof during
erection of roof shall not exceed 13mm from nominal gap.
4.3.3.3. Suspended deck’s roof tolerances.
• The tolerances will be specified by vendor according to requirements of API
620.
Iranian Gas Engineering & Development Co.
Bid Boland Gas Treating Plant II
Part B: Pipe Lines & Mahshahr Facilities
Tehran Jonoob Tech. & Construction Company
Document Title: Page 19 of 22 Document Number:
Proj. No. Field Unit Disc. Type Seq. Rev. 38687901 MHS E502 ME SP 001 03 1b
Steiner-Prematechnik-Gastec GmbH
E-mail: [email protected]
IGED EIED Owner MC
4.3.4. INSPECTION and TESTING
4.3.4.1. The fabricator shall carry out the various inspection and testing according to
API 620, drawings, technical specification and also as described on contract.
4.3.4.2. All tests shall be indicated on INSPECTION and TEST PLAN, submitted
to CONTRACTOR for approval and to be established the witnessed points.
For the witnessed points the fabricator shall provide to CONTRACTOR’S
inspector all facilities along with inspection: tool’s, instruments, etc, for
ensuring that the work is carried out in accordance with the requirements of
relevant codes.
4.3.4.3. Visual inspection of welds.
4.3.4.3.1. All site welding shall be subject of visual inspection by competent
welding inspector of the contractor, to ensure safeguard against failures
or bad practice. Particular attention shall be paid to the vertical and
horizontal joints in the shell plates, butt joints in the annular bottom
plates and other joints that pass under the shell plates. All these joints
shall be thoroughly de-slagged by chipping and brushing, and examined
between each run of weld metal failure such as lack of fusion, surface
cracks, slag inclusions and undercutting.
4.3.4.3.2. The following requirements are to be met :
• The profile of butt welds is uniform, slightly convex and free from overlap at the
tock of weld;
Iranian Gas Engineering & Development Co.
Bid Boland Gas Treating Plant II
Part B: Pipe Lines & Mahshahr Facilities
Tehran Jonoob Tech. & Construction Company
Document Title: Page 20 of 22 Document Number:
Proj. No. Field Unit Disc. Type Seq. Rev. 38687901 MHS E502 ME SP 001 03 1b
Steiner-Prematechnik-Gastec GmbH
E-mail: [email protected]
IGED EIED Owner MC
• There are not pronounced hunps or cavities causing by starting or finish weld
beads;
• The surface of the weld is free from cavities and does not display any porosity.
4.3.4.4. Radiographic inspection of welds.
4.3.4.4.1. Butt-welds in the tank shell and bottom annular plates shall be
radiographically inspected. The percentage of radiographic inspection
will be in fully accordance with API 620, as minimum.
4.3.4.4.2. Radiographs shall be taken as soon as welding of joints in completed. If
repairs are required, these shall be carried out before starting other welds.
New radiographic examination of such repairs shall be carried out.
4.3.4.4.3. Welds defects.
Welds that are shown by radiography to have any of defects or
imperfections defined bellow, shall be judged unacceptable.
• Cracks, incomplete fusion, incomplete penetration;
• Slay inclusions;
• Porosity.
Interpretation of defects must to be done according to codes define by
API 620.
4.3.4.4.4. Repairs to weld and additional radiography, as per codes.
Iranian Gas Engineering & Development Co.
Bid Boland Gas Treating Plant II
Part B: Pipe Lines & Mahshahr Facilities
Tehran Jonoob Tech. & Construction Company
Document Title: Page 21 of 22 Document Number:
Proj. No. Field Unit Disc. Type Seq. Rev. 38687901 MHS E502 ME SP 001 03 1b
Steiner-Prematechnik-Gastec GmbH
E-mail: [email protected]
IGED EIED Owner MC
4.3.4.5. VACCUM BOX TESTING
4.3.4.5.1. After welding of the bottom plates has been completed, all welds must be
tested to ensure that tank bottom is free of leaks by using a vacuum box.
Before the vacuum box testing the welds shall be thoroughly cleaned.
4.3.4.5.2. The weld for tank shell to bottom plates, shall be tested accordind to
requirements of API 620.
4.3.4.5.3. The fillet welds of shell on roof will be tested using liquid penetrant or
magnetic particle method.
4.3.5. HYDROTEST
The inner tank will be hydro-tested in accordance with API 620,
Section 18 and Appendix R, Section R 8.
3
4.3.5.1. PNEUMATIC TEST
The outer tank and roof will be tested in accordance with
API 620, App. R, Sect. R9.
Iranian Gas Engineering & Development Co.
Bid Boland Gas Treating Plant II
Part B: Pipe Lines & Mahshahr Facilities
Tehran Jonoob Tech. & Construction Company
Document Title: Page 22 of 22 Document Number:
Proj. No. Field Unit Disc. Type Seq. Rev. 38687901 MHS E502 ME SP 001 03 1b
Steiner-Prematechnik-Gastec GmbH
E-mail: [email protected]
IGED EIED Owner MC
4.4. QUALITY ASSURANCE & QUALITY CONTROL
4.4.1. Fabricator shall issue the QUALITY ASSURANCE PROGRAMME containing
the OVERAL QUALITY MANAGEMENT and PROCEDURE, which is
required to be adhered to during the execution of tanks.
4.4.2. Fabricator shall establish document and maintain an effective quality assurance
system as outlined in recognized codes.
4.4.3. QAP should cover details of personnel responsible for quality assurance, plans and
procedures, to be followed for quality control in respect of design, procurement,
installation, testing, etc.