This Part prescribes requirements for the This Part prescribes requirements for the REPORTINGREPORTING of:of:
IncidentsIncidents
Annual Pipeline Summary DataAnnual Pipeline Summary Data
Safety Related ConditionsSafety Related Conditions
Where hydrocarbons are: Produced or Where hydrocarbons are: Produced or
First Separated, Dehydrated, or First Separated, Dehydrated, or
otherwise Processedotherwise Processed
Whichever Facility is Farther DownstreamWhichever Facility is Farther Downstream
191.1 (b) Offshore Gathering of Gas191.1 (b) Offshore Gathering of Gas
Upstream from the Outlet Flange of Each Facility Where Upstream from the Outlet Flange of Each Facility Where
Hydrocarbons are ProducedHydrocarbons are Produced
Outer Continental Shelf Upstream from the Point Where a Outer Continental Shelf Upstream from the Point Where a
Production Operator Transfers Responsibility to a Transport Production Operator Transfers Responsibility to a Transport
OperatorOperator
Onshore Gathering of Gas Onshore Gathering of Gas InsideInside of the of the
following areas:following areas:
(i) An Area within the Limits of any: (i) An Area within the Limits of any:
Incorporated or Unincorporated CityIncorporated or Unincorporated City
TownTown
VillageVillage
This Section Will Be Updated in the This Section Will Be Updated in the
Future To Reflect the Jurisdictional Future To Reflect the Jurisdictional
Changes in the Changes in the
Gas Gathering Rule Gas Gathering Rule
Onshore Gathering of Gas Onshore Gathering of Gas
InsideInside of the following areas:of the following areas:
(ii) Any Designated:(ii) Any Designated:
Residential or Commercial AreaResidential or Commercial Area
SubdivisionSubdivision
Business Business
Shopping CenterShopping Center
Community DevelopmentCommunity Development
Where the Operator Purchases Metered Gas Where the Operator Purchases Metered Gas
from an Outside Source for Resalefrom an Outside Source for Resale
Master Meter System:Master Meter System:
A pipeline system for distributing gas within, but A pipeline system for distributing gas within, but
not limited to, a definable area such as:not limited to, a definable area such as:
Mobile Home ParkMobile Home Park
Housing ProjectHousing Project
Apartment ComplexApartment Complex
Supplies the "Ultimate Consumer"Supplies the "Ultimate Consumer"
If you go out to a site on or If you go out to a site on or
near a pipeline and you see near a pipeline and you see
this:this:
You May Have an IncidentYou May Have an Incident
Release of Gas Release of Gas -- -- ""andand""
DeathDeath
Hospitalization InjuryHospitalization Injury
$50,000 Property Damage $50,000 Property Damage
and/or Gas Lossand/or Gas Loss
Emergency Shutdown of an LNG FacilityEmergency Shutdown of an LNG Facility
Significant in Judgment of the Significant in Judgment of the
OperatorOperator
What should an operator do What should an operator do when there is a reportable when there is a reportable
incident?incident?
Activate Emergency Response PlanActivate Emergency Response Plan
Call the NRC IMMEDIATELYCall the NRC IMMEDIATELY
Complete an incident form within 30 Complete an incident form within 30 daysdays
Form RSPA F 7100.1 (Distribution) orForm RSPA F 7100.1 (Distribution) or
Form RSPA F 7100.2 (TransmissionForm RSPA F 7100.2 (Transmission))
National Response CenterNational Response Center
11--800800--424424--88028802
Earliest “Practicable Moment” following Earliest “Practicable Moment” following
discovery ~ No Later than 2 Hoursdiscovery ~ No Later than 2 Hours
NRC Manned by the U.S. Coast GuardNRC Manned by the U.S. Coast Guard
Make Sure They Know This is a Natural Gas Make Sure They Know This is a Natural Gas
Pipeline FacilityPipeline Facility
Document the NRC Report Number, Date, Document the NRC Report Number, Date,
and Time, for the Incident Reportand Time, for the Incident Report
NTSB, Homeland Security and others may be NTSB, Homeland Security and others may be
Notified Under Certain ConditionsNotified Under Certain Conditions
May Require Additional May Require Additional
ReportsReports
MASTER METER & LNGMASTER METER & LNG
OPERATORS EXEMPTOPERATORS EXEMPT
Due 30 days after DETECTION of IncidentDue 30 days after DETECTION of Incident
191.9 Distribution191.9 Distribution191.15 Transmission / Gathering 191.15 Transmission / Gathering
Gas Gas Transmission Transmission
Incident Incident Report FormReport Form
Changes to the formChanges to the form
Requirement for all electronic filingRequirement for all electronic filing
Additional data collectionAdditional data collection
Estimated gas loss of 3,000 Estimated gas loss of 3,000 (million)(million) cubic cubic
feet or more;feet or more; (Typo)(Typo)
(Should read 3000 MCF or 3 Million cubic feet)(Should read 3000 MCF or 3 Million cubic feet)
An explosion or fire not intentionally set An explosion or fire not intentionally set
by the operator.by the operator.
http://opsweb.rspa.dot.gov/cfdocs/opsapps/pipes/main.cfmhttp://opsweb.rspa.dot.gov/cfdocs/opsapps/pipes/main.cfm
What happens if an operator What happens if an operator calls the NRC and discovers calls the NRC and discovers
later that this is not a later that this is not a reportable incident?reportable incident?
Instead of sending the Instead of sending the
incident report form, the incident report form, the
operator sends a letter operator sends a letter
explaining why this is not a explaining why this is not a
reportable incident.reportable incident.
EXEMPT:EXEMPT: LPG System < 100 customersLPG System < 100 customers
Master meter operatorsMaster meter operators
LNG FacilitiesLNG Facilities
Due on March 15 for Preceding CYDue on March 15 for Preceding CY
Unintentional Escape of Gas from the Pipeline Unintentional Escape of Gas from the Pipeline
Test Failures Not IncludedTest Failures Not Included
A NonA Non--Hazardous Release that can be Eliminated Hazardous Release that can be Eliminated
by Lubrication, Adjustment, or Tightening is by Lubrication, Adjustment, or Tightening is NotNot a a
LeakLeak
CorrosionCorrosion
Natural ForcesNatural Forces
ExcavationExcavation
Other Outside Force DamageOther Outside Force Damage
Material and WeldsMaterial and Welds
EquipmentEquipment
OperationsOperations
OtherOther
Offshore (Transmission)Offshore (Transmission)
Annual Report Annual Report -- TransmissionTransmission
Combine with IMP reportingCombine with IMP reporting
Additional dataAdditional data
Electronic ReportingElectronic Reporting
Annual Report Annual Report -- Distribution Distribution
DIMP reportingDIMP reporting
Additional dataAdditional data
Electronic ReportingElectronic Reporting
Transmission Lines Transmission Lines
(20% or more SMYS)(20% or more SMYS)
General CorrosionGeneral Corrosion
Localized Corrosion Pitting Localized Corrosion Pitting To a degree where Leakage Might ResultTo a degree where Leakage Might Result
Where Wall Loss due to Corrosion Requires the Where Wall Loss due to Corrosion Requires the MAOP to be ReducedMAOP to be Reduced
Reports are Reports are
required for:required for:
General General
Corrosion Corrosion
Localized Localized
Pitting on Pitting on
Bare PipelineBare Pipeline
All Pipelines All Pipelines
Unintended Movement or Abnormal Loading by Unintended Movement or Abnormal Loading by
Environmental CausesEnvironmental Causes
Which could affect theWhich could affect the
Serviceability or the Serviceability or the
Structural Integrity of Structural Integrity of
The PipelineThe Pipeline
LNG Facilities LNG Facilities
Any Crack or other Material Defect that Impairs the Any Crack or other Material Defect that Impairs the
Structural Integrity or reliability of an LNG FacilityStructural Integrity or reliability of an LNG Facility
Transmission Lines Transmission Lines
(20% or more SMYS)(20% or more SMYS)
Any Material Defect or Physical Damage that Impairs Any Material Defect or Physical Damage that Impairs
the Serviceabilitythe Serviceability
All Pipelines All Pipelines
Any Malfunction or Operating Error that Causes the Any Malfunction or Operating Error that Causes the
Pressure to Exceed MAOP plus Buildup.Pressure to Exceed MAOP plus Buildup.
All Pipelines All Pipelines
A leak that constitutes an emergencyA leak that constitutes an emergency
LNG Facilities LNG Facilities
Inner Tank Leakage, Ineffective Insulation, or Frost Heave that Inner Tank Leakage, Ineffective Insulation, or Frost Heave that
impairs the Structural Integrity of an LNG Storage Tankimpairs the Structural Integrity of an LNG Storage Tank
All Pipelines All Pipelines
Any Condition that causes a 20% or more Reduction in Any Condition that causes a 20% or more Reduction in
Operating Pressure or Shutdown of Operation Operating Pressure or Shutdown of Operation
Reports are required for:Reports are required for:
Conditions within the RightConditions within the Right--ofof--Way of an Active Way of an Active
Railroad, Paved Road, Street, or HighwayRailroad, Paved Road, Street, or Highway
Exists on a Master Meter System or a CustomerExists on a Master Meter System or a Customer--
Owned Service LineOwned Service Line
Is a Reportable IncidentIs a Reportable Incident
Exists on a Pipeline that is more than 220 yards Exists on a Pipeline that is more than 220 yards
from any Building Intended for Human from any Building Intended for Human
OccupancyOccupancy
Is corrected Before the Deadline for FilingIs corrected Before the Deadline for Filing
Fax to (202) 366Fax to (202) 366--71287128
Within 5 days of DeterminationWithin 5 days of Determination
No more than 10 Days After DiscoveryNo more than 10 Days After Discovery
No specific form No specific form
(Information Requirements are in 191.25)(Information Requirements are in 191.25)
Safety Related Condition Report Safety Related Condition Report -- TransmissionTransmission
Use a standard formUse a standard form
Electronically submit SafetyElectronically submit Safety--Related Related
Condition Reports and Offshore Pipeline Condition Reports and Offshore Pipeline
Condition ReportsCondition Reports
MONMON--TUETUE--WEDWED--THUTHU--FRIFRI--SAT*SUN*MONSAT*SUN*MON--TUETUE--WEDWED--THUTHU--FRIFRI--SAT*SUN*MONSAT*SUN*MON
*DISCOVER
1 2 3 4 5
1 2 3 4
*DETERMINE
5 6 7 8 9 10
(a) (a) OPID RequestOPID Request. Each operator of a gas . Each operator of a gas
pipeline, gas pipeline facility, …must obtain pipeline, gas pipeline facility, …must obtain
from PHMSA an Operator Identification from PHMSA an Operator Identification
Number (OPID). Number (OPID).
This requirement applies to all new and This requirement applies to all new and
existing operators, including operators who existing operators, including operators who
have already been assigned one or more OPID. have already been assigned one or more OPID.
(b) Changes(b) Changes. … through the National Registry of . … through the National Registry of
Pipeline and LNG … at Pipeline and LNG … at http://opsweb.phmsa.dot.govhttp://opsweb.phmsa.dot.gov
60 days prior 60 days prior to any of the following events: to any of the following events:
((ii) A change in the name of the operator;) A change in the name of the operator;
(ii) A change in the operating entity responsible for (ii) A change in the operating entity responsible for
an existing pipeline, pipeline segment, or pipeline an existing pipeline, pipeline segment, or pipeline
facility, or LNG facility;facility, or LNG facility;
(iii) The acquisition or divestiture of 50 or more miles (iii) The acquisition or divestiture of 50 or more miles
of pipeline or pipeline system regulated by PHMSAof pipeline or pipeline system regulated by PHMSA
(iv) Any rehabilitation, replacement, (iv) Any rehabilitation, replacement, modification, upgrade, uprate, or update costing modification, upgrade, uprate, or update costing $5 million or more;$5 million or more;
(v) Construction of 10 or more miles of a new (v) Construction of 10 or more miles of a new gas transmission pipeline or any project gas transmission pipeline or any project involving a pipeline or pipeline facility costing involving a pipeline or pipeline facility costing $5 million or more; or$5 million or more; or
(vi) The acquisition or divestiture of an existing (vi) The acquisition or divestiture of an existing LNG plant or LNG facility or construction of a LNG plant or LNG facility or construction of a new LNG plant or LNG facility.new LNG plant or LNG facility.
If electronic reporting imposes an undue burden If electronic reporting imposes an undue burden
and hardship, an operator must submit a written and hardship, an operator must submit a written
request for an alternative reporting method to request for an alternative reporting method to
the Information Resources Manager, Office of the Information Resources Manager, Office of
Pipeline Safety, Pipeline and Hazardous Pipeline Safety, Pipeline and Hazardous
Materials Safety AdministrationMaterials Safety Administration
Have written procedures Have written procedures
Have the forms and information availableHave the forms and information available
Work with regulatory agenciesWork with regulatory agencies
Review process and workReview process and work
Check for completeness and accuracyCheck for completeness and accuracy
Sign and file on timeSign and file on time
Turn in supplemental reports as requiredTurn in supplemental reports as required
PHMSA Training and Qualification PHMSA Training and Qualification
httphttp://://www.phmsa.dot.gov/pipeline/tqwww.phmsa.dot.gov/pipeline/tq
PHMSA Pipeline Safety RegulationsPHMSA Pipeline Safety Regulations
http://http://www.phmsa.dot.gov/pipeline/tq/regswww.phmsa.dot.gov/pipeline/tq/regs
Questions?Questions?