• OneSAF Integration into AVCATT and CCTT and the development of virtual OneSAF composition as the standard computer generated forces for the virtual domain.
• Development of a standard Terrain Database (TDB) generation process to create a non-proprietary, open format, image generator (IG) independent, Master TDB (MTDB) consumable by virtual simulations, within a total development time of 96 hours.
• The development of a Virtual Simulation Architecture (VSA) to provide a Common Virtual Environment (CVE) that links system and non-system simulations into a fully integrated and interoperable training capability.
• Development of Common Virtual Components (CVC) that will reduce redundancy, increase realism, and facilitate an integrated live, virtual, constructive training environment. (LVC TE)
SE Core Mission
3
One fight involving multiple simulators, using one SAF, on a common terrain database, resulting in a
fair fight environment.
SE Core Vision
One fight involving multiple simulators, using one SAF, on a common terrain database, resulting in a fair fight environment.
SE Core Vision
5
KPP 1. OneSAF Integration into CCTT and AVCATT
KPP 2. Standard Terrain Database Generation Capability
KPP 3. Dynamic Terrain
KPP 4. Atmospheric Effects
KPP 5. Net-Ready
KPP 6. Command, Control, Communications, Computers, Intelligence, Surveillance, Reconnaissance (C4ISR)
Other Non-KPP requirements:
After-Action Review (AAR)
Long Haul Networking
Exercise Management Tools
Master Terrain Database
Visual Models
Urban Operations Insets
Training Support Package
Chemical, Biological, Radiological, Nuclear and High Explosive Environment (CBRNE)
SE Core Requirements
6
Interoperable by use of the: 1. OneSAF2. Common Terrain Databases3. Long Haul Network4. C4ISR
Today• Ad Hoc• Work A-rounds
SE Core• Systematic• “Plug & Play”
SE Core Emerging Requirements
P=Program Office (gov’t)C=Contractor SupportM=Matrix (gov’t)
P=Program Office (gov’t)C=Contractor SupportM=Matrix (gov’t)
John Womack (P)APM
Program AnalystSandra Depew (M)
ContractsDoug Greenwood (M)Mike Hickey (M)
Acquisition LogisticsJeff Patterson (M)
Project Systems EngSusan Rodio (M)
Virtual ArchitectBill Reese (M)
Deputy APM
Leonard Hobbs (C)
DVED PDGene Strickland (P)
Database EngBruce Howie (C)
Database EngMark Johnson (C)
Database Systems Eng Connie Perry (M)
CVC EngPat Garrity (M)
A&I PDChristina Bell (P)
OSI/CVC EngKeith Nielsen (M)
Lead ArchitectRichard Deakins (M)
OSI/C4I EngJuan Garcia (M)
CVC Coordination
SE Core Organization Chart
Staff EngPhong Pham (M)
8
SE Core
Architecture& Integration
(A&I)
Database Virtual Environment Development
(DVED)
OneSAFSystem
Integration(OSI)
Virtual SimulationArchitecture
(VSA)
Common VirtualComponents
(CVC)Functionality
Common VirtualComponents
(CVC)Visual Representation
Database Centers and Database
Production
Standard TerrainDatabase
GenerationCapability (STDGC)
Combined Effort Between Both Primary Contractors
SE Core Functional Breakdown
MayApr Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
DR Fixes, Retest &DeliverSep 7 - 30
GAT / Interop3Aug 31 – Sep 18
CCTT IPT2April 21-23
5.2 Build Eval / Interop2June 1-5
5.3 Build EvalAugust 3-7
AVCATT IPT2May 4-8
GAT Dry RunAug 24 – Sep 11
Code Freeze
GAT TRRAug 27
CCTT, FCS, C4I, Misc Evaluation
SE Core DR Work
AVCATT, C4I, O2, GAT
CCTT C4 and Other Development
AVCATT C4I Development
CCTT Misc Development
Afghanistan Area 1400 x 250 km
Central Iraq300 x 250 km
Afghanistan Area 2TBD
OTF 8
AVCATT Database Validation
Interoperable Database Validation
AVCATT CM2 Delivery
Re-turn of OTF 7 Databases
FCS
LCT
LVC-IA
Common Sensor Model AoA
OpenFlight Plug-in
AVCATT Database IPT
Database Working Group
SE Core Schedule
10
SE Core Interoperability Demonstration December 2008
CCTT Manned Module
CCTT SAF Entities
AVCATT Manned Module
OneSAF Entities
CCTT Manned Module
Embedded OneSAF Entities
AVCATT Manned Module
Embedded OneSAF Entities
AVCATT Spiral
ERC Demo
SE Core OSI
IPD2
IPD1
Program Manned Modules
DVED Interoperable databases
Common SAF Common Models
Environment
CM2 Models
Manned Module, Host and IG extensions.
AVCATT ongoing integration of ERC and OneSAF
AVCATT, CCTT Manned Modules and SAF running ERC
Running
CCTT Converted
Baghdad OTF database.
Air FocusDVEDdatabases
OneSAF replaces legacy SAFs
Ground Focus
Interoperability Continuum
Capabilities to be Demonstrated in December 2008
• CCTT/AVCATT/ OneSAFInteroperability
• Successful execution of Air-Ground Scenario
• Embedded OneSAF entitiesinteract and engage CCTT and AVCATT manned modules.
• AVCATT and CCTT running Same Terrain Database
• Common Format• Common Features
• Cross platform model alignment
• Requires less setup time
• Reduces Engineering work aroundJun 07 Jan 08 June 08 Dec 08 Apr 09 Sep 09 Sep 10
11
Block / Build Schedule
A Block is 1 year duration, tied to the Gov’t fiscal year Builds are approximately 3 months each
• Build Demonstrations to verify interim capabilities Facilitates incremental development and testing of capability
Build 4Build 4(I&T)(I&T)Build 1Build 1
Build 1Build 1Build 2Build 2
Build 3Build 3Build 4Build 4(I&T)(I&T)
Block 4 Block 5October 2007 – September 2008 October 2008 – September 2009
10/01 – 01/11
04/05 – 06/2706/28 – 09/26
09/27 – 01/0901/10 – 04/03
04/04 – 06/2606/27 – 09/25
Build 2Build 2
Build 3Build 3Build 4Build 4(Dev)(Dev)
01/12 – 04/04
SGT & Databases
12
OSI Build Plan
Build 5.1
09/27/08 – 01/09/09
Build 5.2
01/10/09 – 04/03/09
Build 5.3
04/04/09 – 06/26/09
Build 5.4
06/27/09 – 09/25/09
Static Task Organizations
ADA Behaviors
RWA-scout & attack ADA FARP
AVCATT VMF Message Threads
Common Environment Damage
ERC extensions to support models
Updates for cargo groupings
AH64D Fire Control Radar Model Capability (start)
Aircraft Survivability Equipment (ASE)
Chaff (Radar Countermeasures Dispensers)
Flare (Infrared Countermeasures Dispensers)
IR Jammers Missile Approach Warning
Systems Common Missile Warning
System
AVCATT AFAPD Message Mappers
Scenario Planning (continue)
Static Task Organizations
CSS Behaviors
CSS Breaching
Resupply
FASCAM
JAAT
Update OneSAF Communication
ERC extensions to support models
Final Emissions
Longbow Editor
SAF Slingload and Editor
AH64D Fire Control Radar Model Capability (Final)
AVCATT AFAPD Message Threads
Scenario Planning (complete)
CFS / Full Tether
MM Behaviors
Movement Occupation Halt RWA Attack
Static Task Organizations
Urban Ops Behaviors
Urban Ops IEDs
ERC extensions to support models
Aircraft Survivability Equipment (ASE)
Threat Interferometer (Threat Signature Identification)
Usability Improvements
CCTT FDC WS
Common Tactical Smoke
Repair
Recovery
Artillery Fire Control User Interface 4.3 – Define and update OneSAF user interfaces to support the artillery requirements of the OC Workstations from CCTT
Stealth Control User Interface 4.3 – Define and add the capability to control the Stealth View (MetaVR) as currently done in AVCATT
Integration and Test activities
DR Fixes, Retest &DeliverSep 7 - 30
July
Road To GAT
Jan Feb Mar April May June August Sept
Final Integration
GAT Dry RunAug 24 – Sep 11
GAT / Interop3Aug 31 – Sep 18
GAT TRRAug 27
Build 5.2
5.1 Build EvalFeb. 23-27
Build 5.3
AVCATTIPT2May 4-8
CCTT IPT2April 21-23
Build 5.4
DR Fixes
OneSAF Common Baseline GAT Initial Go/NoGoDecisionAug 7
DR Fixes
5.2 Build Eval / Interop2June 1-5
DR Fixes
5.3 Build EvalAugust 3-7
DR Fixes
DR Fixes
Code Freeze
CCTT Scenarios Available to SECoreJun 24
Schedule Post GAT
SeptJulyMayAprilSept Oct Nov/Dec Jan Feb March June August
SE CoreA&I GAT(CCTT and AVCATT)
CCTTFCSC4IMiscEvaluation
AVCATTC4IO2GAT
AVCATTOSIRFT
CCTT Integrationof OSI
AVCATT Integrationof OSI
SE Core DR Work
CCTT C4I Development
AVCATT C4I and Misc Development
AVCATT OneSAF Operational (O2) Development
CCTTOSIRFT
2009 2010
CCTT Misc Development
Behavior Working Group Process
Elicit / Document AVCATT & CCTT Behaviors
(Owner – SE Core A&I)
TCM-V to provide clarification of legacy capabilities
Elicit OneSAF Reuse Candidates
(Owner - OneSAF)
Provide reuse candidate(s), documentation, and initial gaps
Develop Recommendation
(Owner – SE Core A&I)
Identify Gaps, COAs and Development Estimate
Peer Review
(Owner – SE Core A&I)
Stakeholder Participation:AVCATT and CCTT Training SME
SE Core A&IOneSAF
Approve Recommendation
(Owner - TCM-V)
Review Recommended COA against required training capabilities.Adjudicate program disputes.
Baseline Approved Document
(Owner – SE Core A&I)
CM/Change Control activities
Execute Development of Behavior
(Owner – SE Core A&I / AVCATT for select tasks)
Visual Inspection of Behavior
(Owner – TCM-V)
Document Defects
Identify OneSAF “As Is” Candidates
(Owner – OneSAF)
Provide behavior candidate(s) that can be used “as is” with documentation
Process Behavior List
(Owner – SE Core A&I)
Determine Path Forward for each Behavior
Behaviors
Behaviors
RWA Battle Position Search and Occupy
Conduct Ground Reconnaissance
Clear and Mark Breach Lanes
Conduct Screening Operations Ground
Tailgate Resupply
RWA Attack
Unit Defend Battle Position
To the Nth Behavior
Working Group Steps (Overview)
Requirement Analysis
Internal Review
Behavior Working Group
Development
Integration and Test
Ready for GAT
17December 2008 I/ITSEC 2008
Why Use OneSAF
Provide interoperabilityVirtual TrainersLVC-IA
Provide for a Fair FightOneSAF equals one fight
Configuration ControlMaintain one SAF for entire Virtual Domain
CCTT SAFAVSAFLongbow Crew Trainer
Save money
Life After OneSAF Integration
Dynamic Environment (terrain, atmospherics, sensor)
Virtual Simulation Architecture (VSA)• V-DIS advancement into IEEE DIS standard• Extend existing CVCs for customers
– AAR, Interop Gateway, C4I, Scenario Generation
• Maintain SE Core portal• New CVC opportunities
– Distributed AAR– Market research
19
Database VirtualEnvironment Development
20SE CORE DVED GAT OUTBRIEF
Production Metrics Trend Analysis
0
2000
4000
6000
8000
10000
12000
14000
16000
DB Development Time CCTT Legacy - SE Core DVED
Riley (P6)
Campbell (IPT5)
Pinion Canyon (GAT)
Metrics scaled to 100km x 100km
database
SE CORE DVED GAT OUTBRIEF10/3/2008
5 to 6X Productivity Improvement Over CCTT Legacy Databases and ~1.4X Improvement Over GVT
CCTT Legacy
SE Core Development
SE Core GAT
21
DVED Government Acceptance TestSuccesses of the Test
The GAT has produced four databases covering a larger area than those current CCTT terrain databases.
Production of the 180 x 180 (32,400 sq. km.) databases will be larger than any CCTT terrain database.
Database Area
Physical (X) Physical (Y) KM2Physical (X) Physical (Y) KM2
CentralUS 102.70 150.70 15,476.89Desert 100.80 150.70 15,190.56
Ft. Hood 46.00 53.76 2,472.96 90.00 90.00 8,100.00Kosovo 148.80 160.30 23,852.64Korea 115.20 115.20 13,271.04Grafenfels 72.00 85.44 6,151.68
Ft. Riley 42.24 57.60 2,433.02 90.00 80.00 7,200.00Ft. Carson 38.40 53.76 2,064.38
Ft. Stewart 65.28 42.24 2,757.43 94.00 94.00 8,836.00Pinon Canyon 69.12 57.60 3,981.31 90.00 90.00 8,100.00Baghdad 53.76 53.76 2,890.14Ft. Bliss 97.92 97.92 9,588.33
CCTT Database Area DVED Database Area
22
Metric Collected
Current Projected Unit
DB Effort
Release 2.0 Projected Unit DB
Effort
Release 2.1 Projected Unit DB
Effort
Release 2.2 Projected Unit DB
Effort
(man hours) (man hours) (man hours) (man hours)Grand Total 3097 2997 2419.7 2096.66FTE 18 18 14 12Sq. KM / Month with 12 people 22,095 22,832 28,280 32,637Sq. KM / Month with 18 people 33,143 34,249 42,420 48,956
Achieving desired production rate requires 6 additional database engineers plus some continued CM2 support to enhance model libraries.
The DVED team has evaluated the cost benefit of hiring six additional production bodies as opposed to software development.
Production vs. Software Development
Production vs. Software Development
23
180 x 180
24
Database Production Schedule
Oct 08 Jan 09 Apr 09 Jul 09 Oct 09 Jan 10 Apr 10 Jul 10 Oct 10
Ft. Stewart, Ft. Hood, Ft. Riley, Pinion
Canyon
Afghanistan Area 1400 x 250 km
Central Iraq300 x 250 km
Ft. Irwin
Ft. Benning
Ft. Campbell
Afghanistan Area 2TBD
Ft. Bliss400 x 250 km
KoreaTBD
Database Priorities As Determined by TCM-V
1. Satisfy operational training requirements.
2. Replace existing CCTT and AVCATT DBs.
3. New requirements (such as FCS).
Database Priorities As Determined by TCM-V
1. Satisfy operational training requirements.
2. Replace existing CCTT and AVCATT DBs.
3. New requirements (such as FCS).
25
Correlated Dataset
Required
Standard Source Data
NGACommercialJoint ServicesOther• Agencies• Governments• Countries
Potential sources
Automated tools • use standard source data• Correct / Align Data• Add / Merge / Value Added
Master Terrain DB Generation
Toolset
• Non-Proprietary• Open format • IG Independent• Correlated Data• Traceability to Source Data• Consumable by virtual Sims
OOSEDM
Expand for Virtual Domain
Plug-Ins
To
ol K
it
Total development time of 96 hours (72 hrs)• 180 km x 180 km (DTED level 3) (300km x 300km)• 2.5km x 2.5km (DTED level 5) urban insert (50km x 50 km)• (1000km x 1000km (DTED level 1) large areas)
Produce correlated runtime databases to enable training for Produce correlated runtime databases to enable training for mission planning, mission rehearsal, and mission execution.mission planning, mission rehearsal, and mission execution.
Standard / Rapid TerrainDatabase Generation Capability
26December 2008 I/ITSEC 2008
Plug-in Development Process
To access correlated databases from SE Core DVED, programs are required to use a “plug-in” to the Runtime Database Generation Toolkit (RDGT)
The major elements in the plug-in development process are:• Go to the SE Core Portal (http://se-core.org) and request a copy of the
DVED SEE API SDK (DVED Government Sponsorship required)
• Develop the plug-in– Build the sample database and moving models directly to your runtime format
• On-site DVED testing– Testing in the DVED Controlled Development Lab on more robust data
– Run correlation tests– Distributed processing testing– Documentation review
• Receive Plug-in Validation for DVED production
27December 2008 I/ITSEC 2008
Plug-ins Developed & Planned
Plug-ins Developed to Date Plug-ins being developed in GFY09
EPX Plug-in (version 2.1.3 and 2.3) OTF (version 8.0)
OTF (version 6.0) ESRI Shape with FFD attribution
CCTT Plan View Display DTED
CCTT Environment Manager CADRG for FBCB2
CCTT Radio Database (TIREM) OpenFlight (version 15.7)
SEDRIS (ISO compliant) CIB
ESRI Geodatabase Plug-in Encapsulated Postscript
December 2008 I/ITSEC 2008
GAT CCTT Database Highlights
Fort Stewart Fort Hood
Fort Riley Pinion Canyon
29
• CM2 Deliveries:
- 157 models to GCTT
- 261 models plus variants going to CCTT on 26 Nov 08
- Other deliveries include AF for evaluation
Common Moving Models
• Sept 2009 CM2 to correlate with OneSAF (behaviors, geometry, bounding volumes, etc.)
30December 2008 I/ITSEC 2008
DVED Summary
• Significant production efficiencies have been realized through enhancement of tools, processes, and training
• Integrated suite of multiple-vendor plug-ins rapidly produces correlated runtime databases using multiple geographic projections in a single build
• GAT successfully conducted and databases validated on CCTT• Terrain Database Production Go Ahead Received• CM2 Production well underway with over 256 models currently
available
31
Program Concerns
34 34
Afghanistan Database
RC(S)
RC(E)
Afghanistan – East TDB
Afghanistan – South TDB
35 35
Afghanistan East
36 36
Generic FOB Photo
Living Quarters
Maintenance Building
Storage Building
Storage Containers
Motor Pool
Small Storage Containers
Guard Tower
HeliPad
37
Correlated Dataset
Required
Standard Source Data
NGACommercialJoint ServicesOther• Agencies• Governments• Countries
Potential sources
Automated tools • use standard source data• Correct / Align Data• Add / Merge / Value Added
Master Terrain DB Generation
Toolset
• Non-Proprietary• Open format • IG Independent• Correlated Data• Traceability to Source Data• Consumable by virtual Sims
OOSEDM
Expand for Virtual Domain
Plug-Ins
To
ol K
it
Total development time of 96 hours (72 hrs)• 180 km x 180 km (DTED level 3) (300km x 300km)• 2.5km x 2.5km (DTED level 5) urban insert (50km x 50 km)• (1000km x 1000km (DTED level 1) large areas)
Produce correlated runtime databases to enable training for Produce correlated runtime databases to enable training for mission planning, mission rehearsal, and mission execution.mission planning, mission rehearsal, and mission execution.
Standard / Rapid TerrainDatabase Generation Capability
38December 2008 I/ITSEC 2008
Architectural Overview
Standard / Rapid Terrain Database Generation Capability
Run Time Generation Toolset (RDGT)
Fil
tere
d V
iew
er
Master Terrain Database Generation Toolset (MTDGT)
Att
rib
uti
on
3D
Mo
de
ls
Ima
ge
ry
Run Time Applications
So
urc
e D
ata
Qu
ali
ty
As
su
ran
ce
Raw Source
Run Time Databases
Po
lyg
on
/Ge
om
etr
yE
ng
ine
Ve
cto
rs
Ele
va
tio
n
Sp
ec
iali
zati
on
SEE API
CGF
Mission
Maps
Visual
Sensors
PVD
ConfigurationManagement
So
urc
e D
ata
C
orr
ec
tio
ns
So
urc
e D
ata
In
po
rte
r
Source Data Asset Management
Application Plug-Ins
SEDRIS Plug-In
Paper Map Plug-In
Elec. Map Plug-In
DBDD Plug-InMaster
Database (MDB)
Write API
Read API
MDB Repository Quality Assurance
Storage ArchitectureSource Interchange
FormatsRaw
SourcesCAD
Sources
Supervisor
Refinement
Key Challenges• Common DB products must address the needs of many• Optimizing Tools, Processes & Personnel to achieve > 10X improvement in DB productivity
while satisfying multiple confederates• Concurrent development with other major initiatives (OneSAF) and Confederate upgrades• Requires a significant User paradigm shift from traditional DB development and acceptance
methods
39December 2008 I/ITSEC 2008
DVED STDGC Process Risk Status (Oct. 31, 2008)
RDGTMDBMTDGT
TCMV
Database Request
DVED GT
Sou
rce
Dat
a To
ols
Sou
rce
Dat
a C
orre
ctio
ns
Sou
rce
Dat
a Q
ualit
y A
ssur
ance
RawSourceData
Ele
vatio
n P
roce
ssin
g
MTDGT Processing
Imag
ery
Pro
cess
ing
Vec
tor P
roce
ssin
g
Mod
el P
roce
ssin
gS
ourc
e D
ata
Spe
cific
atio
n
MDB
MD
B A
PI
MD
B A
PI
MDB Quality Assurance
RDGT Processing
Spe
cial
izat
ion
Filte
red
MD
B C
onte
nt
Pol
ygon
Gen
erat
ion
Eng
ine
SE
E A
PI
EPX Plugin
SEDRIS Plugin
DBDD Plugin
TIREM Plugin
OTF 6 Plugin
EnvManager Plugin
PVD Plugin
Map Plugin
Programs
Future Development
No SignificantTrainability
Risk
DVEDProduct
Def
ault
Par
amet
ers
Pro
gram
Inpu
ts
MinorTrainability
Risk
Shape File Plugin
DTED Plugin
CIB
CADRG
Host File Plugin