joint agency workshop on the governor’s energy efficiency goals cec iepr workshop on 2030...

14
Joint Agency Workshop on the Governor’s Energy Efficiency Goals CEC IEPR Workshop on 2030 Efficiency Goals Panel Topic Codes and Existing Buildings Monday July 6, 2015 Cynthia Mitchell, TURN consultant

Upload: shannon-nichols

Post on 04-Jan-2016

218 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Joint Agency Workshop on the Governor’s Energy Efficiency Goals CEC IEPR Workshop on 2030 Efficiency Goals Panel Topic Codes and Existing Buildings Monday

Joint Agency Workshop on the Governor’s Energy Efficiency Goals

CEC IEPR Workshop on 2030 Efficiency Goals

Panel TopicCodes and Existing Buildings

Monday July 6, 2015

Cynthia Mitchell, TURN consultant

Page 2: Joint Agency Workshop on the Governor’s Energy Efficiency Goals CEC IEPR Workshop on 2030 Efficiency Goals Panel Topic Codes and Existing Buildings Monday

• How well are the CEC’s and CPUC’s economic methodologies for cost effectiveness working for us?

• Should we modify or replace these methods to better align with the scale and pace needed to reach California’s climate goals?

• Whose capital should be used to achieve these goals – utility ratepayers, building owners, utility treasuries, government, and private capital?

Page 3: Joint Agency Workshop on the Governor’s Energy Efficiency Goals CEC IEPR Workshop on 2030 Efficiency Goals Panel Topic Codes and Existing Buildings Monday
Page 4: Joint Agency Workshop on the Governor’s Energy Efficiency Goals CEC IEPR Workshop on 2030 Efficiency Goals Panel Topic Codes and Existing Buildings Monday

100,000

120,000

140,000

160,000

180,000

200,000

220,000

240,000

260,000

280,000

1972 1974 1976 1978 1980 1982 1984 1986 1988 1990 1992 1994 1996 1998 2000 2002 2004 2006 2008 2010

GW

h California Electricity Consumption: 1972-2011

Recession Early 1980s

Recession Early 1990s

CA Energy Crisis / Recession 2001-2002

2008 Financial crisis / Recession

Source: EIA SEDS Data

Oil Crisis

Page 5: Joint Agency Workshop on the Governor’s Energy Efficiency Goals CEC IEPR Workshop on 2030 Efficiency Goals Panel Topic Codes and Existing Buildings Monday

5,600

5,800

6,000

6,200

6,400

6,600

6,800

7,000

7,200

7,400

7,600

1972 1974 1976 1978 1980 1982 1984 1986 1988 1990 1992 1994 1996 1998 2000 2002 2004 2006 2008 2010

kWh

per

capi

ta

California Per Capita Electricity Consumption: 1972-2011

Recession Early 1990s

CA Energy Crisis / Recession 2001-2002

2008 Financial crisis / Recession

Source: EIA SEDS Data

Oil Crisis

Recession Early 1980s

Page 6: Joint Agency Workshop on the Governor’s Energy Efficiency Goals CEC IEPR Workshop on 2030 Efficiency Goals Panel Topic Codes and Existing Buildings Monday

“To Do List”

1. Refine and improve current EE – consumer investment driven construct.

2. Realize CA’s full economic EE potential via long-term capital market investments.

“Kilowatthours are now flowing two ways,

as should EE revenue opportunities.”

TURN, R.14-10-003, iDSM, May 29, 2015

Page 7: Joint Agency Workshop on the Governor’s Energy Efficiency Goals CEC IEPR Workshop on 2030 Efficiency Goals Panel Topic Codes and Existing Buildings Monday

New Transaction Structures (1) • G,T,D; and solar, storage, DG finance their

investments based on future cash flows from selling energy, or project finance.

• Finance EE like an energy infrastructure investment.

• Project finance for a power plant is based on the long term cash flows from selling power.

• Meter EE and pay for savings as they are delivered; turn EE into a cash flow, which can then be financed.

Page 8: Joint Agency Workshop on the Governor’s Energy Efficiency Goals CEC IEPR Workshop on 2030 Efficiency Goals Panel Topic Codes and Existing Buildings Monday

New Transaction Structures (2)

• Authorize iDSM pilots to test EE, bundled with DR and other DERs (“bundled Efficiency”).

• Bundled Efficiency is site-specific, persistent, correlates well to circuit and substation loads, and is measurable at the meter.

• Achieve significant site-specific load and consumption reductions – 25 - 40%.

• Commoditize the benefit streams to meet system needs. • Use dynamic baselines (counterfactual algorithms) and

smart meter data to create transparent and real time accounting for savings.

Page 9: Joint Agency Workshop on the Governor’s Energy Efficiency Goals CEC IEPR Workshop on 2030 Efficiency Goals Panel Topic Codes and Existing Buildings Monday
Page 10: Joint Agency Workshop on the Governor’s Energy Efficiency Goals CEC IEPR Workshop on 2030 Efficiency Goals Panel Topic Codes and Existing Buildings Monday

Chicken Picture

Page 11: Joint Agency Workshop on the Governor’s Energy Efficiency Goals CEC IEPR Workshop on 2030 Efficiency Goals Panel Topic Codes and Existing Buildings Monday

Economic Methodologies for Cost Effectiveness

• Benefits and Costs as a ratio: B/C, with 1.0 or greater positive benefits.

• Costs: utility / ratepayers + participant.

• Benefit: net present value of avoided costs of the supply-side resources (G,T,D) avoided or deferred.

• Avoided costs: energy, ancillary services, emissions (GHG), capacity, T&D (area & time-specific), xxx RPS, and losses. – On peak multiplier and T&D deferral values.

End Notes

Page 12: Joint Agency Workshop on the Governor’s Energy Efficiency Goals CEC IEPR Workshop on 2030 Efficiency Goals Panel Topic Codes and Existing Buildings Monday

End Notes

• Market or Business as Usual: Encourage and promote customer EE investments.

• Consumers willing and able to make EE capital investments based on 10 - 20+ year paybacks.

• McKinsey 2009: Consumers very short payback requirements. Residential 2-3 yr; Commercial 3.6 yr; Industrial 18 mo – 3 yr.

• Largely “mass market”, statistical function integrated across thousands of discrete and dispersed efficiency measures. Estimation of savings.

• Economic: Supply side avoided cost analysis 20+ years. Large capital markets with returns on investments matched to energy value provided via G,T,D infrastructure investments over time.

• Efficiency bundled with DR, ES, solar, DG as DER. Location and site specific, significant load and energy reductions / management. Metered load reductions.

Page 13: Joint Agency Workshop on the Governor’s Energy Efficiency Goals CEC IEPR Workshop on 2030 Efficiency Goals Panel Topic Codes and Existing Buildings Monday

End Notes

Market-based-BAU EE Portfolios

• Largely “low hanging fruit” savings – CFLs and T8s• One-third savings from C&S assuming high compliance rates • Utility savings claims adjusted downward by about 50% through the

CPUC’s measurement and verification process. • “Paper” cost-effectiveness marginal at best. • Efficiency savings that are over time less than incremental load growth • Rube Goldberg construct: 200+ programs

Page 14: Joint Agency Workshop on the Governor’s Energy Efficiency Goals CEC IEPR Workshop on 2030 Efficiency Goals Panel Topic Codes and Existing Buildings Monday

End NotesModifications to make C/E analysis for EE, DR, ES, solar, and DG, more comparable and transparent.

“Play Nice Together” Test: EE, DR, ES, solar, and DG effects be integrated into the CEC demand forecast to effect procurement.

Counting / accounting effects: consider interactions, integration; format for tracking & reporting that is logical, traceable, transparent; consistent (where sensible); aggregate cumulative effect.