  • 7/29/2019 JR2010010 Marine Warranty Surveyors CoP[1].pdf

    1/14

    A Joint Committee of the IUA and LMA

    Joint Rig CommitteeRoom 358, Lloyds, One Lime Street

    London EC3M 7DQTel: (+44) 020 7327 3333 Fax: (+44) 020 7327 4443

    PRIVATE AND CONFIDENTIALEnquiries to: JR 2010/010

    John Gurtenne 23 July 2010(Direct Dial 020 7327 4045)

    Joint Rig CommitteeMarine Warranty Surveyors Code of Practice and Scope of Work (JR 2010/010)

    Attached for underwriters use and information is a copy of the revised Joint Rig CommitteeMarine Warranty Surveyors Code of Practice (CoP) and Generic Scope of Work (GSoW)(JR2009/002), drawn up by JRC after consultation with surveyors, and others..

    This Code of Practice and Generic Scope of Work replaces the 2004 Code of Practice and2005 Generic Scope of Work previously issued by JRC. It is now presented as a singledocument which underwriters may use as an Endorsement to marine energy coverages theyare issuing. In common with all JRC produced Clauses, this Clause is published by JRC, butit is expressly non-binding and JRC makes no recommendation as to its use in particularpolicies. Underwriters are of course free to offer different policy wordings and clauses to theirpolicy holders.

    The Code of Practice and Scope of Work has the following objectives:

    To:

    Clarify the respective roles of the Marine Warranty Surveyor, the Assured, and

    Underwriters Define the function of the Marine Warranty Surveyors Scope of Work.

    Outline criteria for Marine Warranty Surveying activities.

    Establish guidelines for communication with underwriters.

    This Endorsement also gives Underwriters the option of specifying the application of anProject Specific Scope of Work (PSoW) where they think this is required,

    Should underwriters have any questions on the background, & use of this Code of Practiceand Scope of Work, please contact John Gurtenne, secretary to the Joint Rig Committee([email protected] 020 7327 4045, or Len Messenger, Chairman of the JRCsEngineering and Survey Sub-Committee, on 020 7648 3577.

    mailto:[email protected]:[email protected]
  • 7/29/2019 JR2010010 Marine Warranty Surveyors CoP[1].pdf

    2/14

    A Joint Committee of the IUA and LMA

    MARINE WARRANTY SURVEY

    1) Coverage under this Policy for proj ect act ivi t i es is condit i onal upon:

    a) A Marine Warranty Surveyor being appointed by the Assured from the fol lowing

    panel

    _______________________________________________________1

    on or before _ _ / _ _ / _ _2; and

    b) Issuance of the Certif icates of Approval (C of As) by the Marine Warranty Surveyorfor each operation as specified in the Generic Scope of Work (GSOW) containedherein or t he Project Specif i c Scope of Work (PSOW) explici t ly agreed byUnderwriters.

    A kick off meet ing is required Yes/ No3

    2) I t is t he dut y of the Assured to procure the compl iance wit h al l recomm endations,requirements or restr ict ions of the Marine Warranty Surveyor within the specif iedt imescales. In t he event of a breach of th is dut y, Underwr i t ers wi l l not be l iab le forany loss, dam age, l iabi l i t y or expense ar ising from or contr ibut ed to by such breach.

    3) The Marine Warranty Survey shall be conducted in accordance wit h the Marine WarrantySurveyor Code of Practice (CoP) and the GSOW contained herein (or the Project specificScope of Work (PSOW) as agreed by t he Contr act leader(s)).

    A mater i al change to t he project wil l require a review of t he Scope of Work.

    4) The cost of t he Marine Warrant y Survey wil l be borne by the Assured.

    5) Any expenses incurred to comply wit h the Marine Warranty Surveyor srecomm endations wil l be solely at t he expense of t he Assured.

    6) The Marine Warranty Surveyor shall not be rest r ict ed from f urnishing informat ion to orconsult ing in an unrestr icted manner with Underwriters.

    7) Underwrit ers shall be entit led to receive a copy of any recommendat ions and/ orreport s direct ly f rom t he Marine Warrant y Surveyor.

    ____________________1 Names of MWS Compani es t o be i nsert ed2 Date to be inserted3 Cir cle r equ i red opt ion.

  • 7/29/2019 JR2010010 Marine Warranty Surveyors CoP[1].pdf

    3/14

    A Joint Committee of the IUA and LMA

    Joint Rig Committee Marine Warranty Surveyors Code ofPractice (CoP) 2010

    This CoP has been produced in order to establish agreed standards for Marine WarrantySurveyors performance while conducting Marine Warranty Surveys.

    It has the fol lowing object ives:

    To :

    Clar if y t he role of t he Marine Warranty Surveyor. Define t he funct ion of the Marine Warranty Survey Scope of Work.

    Out l ine approval cr i t er ia f or Marine Warranty Surveying act i vit ies.

    Est ablish minim um st andards for Marine Warranty Surveyor perfor mance.

    Define l ines of communication between Underwriters and the MarineWarranty Surveyor.

    Not hing in t his CoP shall rel ieve any part y of any legal obligat ions exist ing in t he absence oft his document. The Code of Pract ice out l ines t he obligat ions for t he Marine WarrantySurveyor, t he Assured & t he Underwrit er.

    The Code of Pract ice incl udes a Generic Scope of Work (GSOW) in t abular f orm at. At ai lored Project Specif ic Scope of Work (PSOW) may be subst it uted for t he GSOW wi t h t heexpl ic i t agreement of Underwr i t ers.

    1 Role of the Marine Warranty Surveyor

    1.1 The fundament al obj ect ive of t he Marine Warranty Surveyor is t o make reasonableendeavours to ensure that the r isks associated with the warranted operat ions to which aMarine Warranty Surveyor is appointed are reduced to an acceptable level in accordancewit h best indust ry pract ice.

    1.2 The Marine Warranty Surveyor Company wil l only appoint personnel who aredemonstrably competent , in terms of qual i f icat ions and exper ience, to per form thereview / approval act i vit y being undertaken in accordance wit h t he Marine Warrant y Scopeof Work.

    1. 3 The Marine Warranty Surveyor wil l be satisf ied, so far as possible, that theoperations are conducted i n accordance wit h:

    recognised codes of practice for design and operations;

    best indust ry pract i ce appropr iate f or t he vessels, equipment and locat ion;

    vessels and equipment being used wit hin defi ned safe operat ing l im it s.

    1. 4 The Marine Warranty Surveyor wil l make available t o Underwrit ers:

    an opinion on t he adequacy of t he Marine Warranty Scope of Work;

    part iculars of t he experience of t he key personnel t o be engaged;

    a schedule of actual and proposed site at t endances;

    a schedule of Cert i f icat es of Approval t o be issued.

    1. 5 The Marine Warranty Surveyor shall perform a review of the relevantdocumentat ion in accordance wi th the requirements of I tem 1.3 above re lat ing to theproposed operat ions within the Marine Warranty Scope of Work including, but not l imitedt o:

    calculat ions;

    drawings;

    procedures;

    cer t i f icates;

    manuals;

    relevant reports.

  • 7/29/2019 JR2010010 Marine Warranty Surveyors CoP[1].pdf

    4/14

    A Joint Committee of the IUA and LMA

    1. 6 The Marine Warranty Surveyor shall carry out suitability surveys of vessels,st ruct ures and equipment pr ior to each operat ion, including any required fol low up closeout inspections unless otherw ise defined in t he Marine Warranty Scope of Work, and shall :

    est ablish t hat t he relevant i t ems are suit able for t he proposed operat ions;

    make known, in clear terms, in wr it ing to the Assured the recommendationst o be implement ed pr ior t o commencement of t he proposed operat ions;

    make known, in clear terms, in wr it ing to the Assured the recommendationsto be implemented dur ing the per iod of the proposed operat ions;

    review metocean condit ions and, where appropr iate, incorporaterequirements as to metocean condit ions in the recommendations in theCert i f icate(s) of Approval;

    observe and record t he preparat ions for t he proposed operat ions;

    att end and wit ness cr it ical funct ion t est s or relevant assurance tests.

    1. 7 Subject to the Marine Warranty Surveyor being satisf ied that the object ivesoutl ined under I tems 1.1 above wil l be met, the Marine Warranty Surveyor wil l issue aCer t i f icate of Approval . The Cer t i f icate of Approval wi l l c lear ly ident i f y:

    t he operat ion to be car r ied out ;

    t he vessel(s) to be used; recommendations to be satisf ied dur ing the per iod of the proposed

    operat ions wit hin the Marine Warranty Scope of Work. Recommendat ionsissued for the Assureds implementat ion should be targeted to reduce r iskt o Underwr i t ers and worded in a c lear and expl ic i t manner and whether t herecommendation has been implemented or not should be capable of beingobject ive ly ver i f ied.

    1. 8 The Marine Warranty Surveyor wi l l :

    advise Contract leader(s) when a confidential i ty agreement with theAssured is in place which would preclude the exchange of information orcommunication with Contract leader(s);

    not provide any other services t o the Assured and/ or Operat or and/ or MainCont ractor(s) and/ or Sub Contr actor(s)that could present a confl ict ofin t erest wi t h t he Mar ine Warrant y Work, for example:i ) Marine or Design Consultant involved ina/ Design of proj ect com ponents t o be used in a marine operat ion, t hefa i lure of which could compromise the integr i ty of a pro ject asset ( forexample a l i f t beam or padeye).b/ Pr im ary analysis of st ruct ures, hull s or component part s ther eof. Note:the Marine Warranty Surveyor is however expected to review a design byothers where this has a direct bear ing on the marine r isk e.g. check of thestrength of launch frames on a launch jacket, or assessment of a l i f tanalysis of a deck.c/ The product ion of procedures, pr oj ect st andards, r isk assessment s and

    other management documentat ion which inf luences how a marineoperation is conducted and which has a direct bear ing on the r isk of apar t icu lar mar ine operat ion e.g. loadout , l aunch, l i f t o f a j acket . i i ) Loss adjusterii i) Classif icat ion Authori t yiv) Verification

    1. 9 The Marine Warranty Surveyor wil l immediately advise Contract leader(s), with acopy to the Assured:

    i f any Cert i f icate of Approval is withheld; or a Non Conformance Cert i f icateissued;

    i f the Assured fai ls to comply with any recommendations made by the

    Marine Warranty Surveyor; of any proposed changes to rel evant k ey personnel employed by t he Marine

    Warranty Surveyor.

  • 7/29/2019 JR2010010 Marine Warranty Surveyors CoP[1].pdf

    5/14

    A Joint Committee of the IUA and LMA

    1.10 The Marine Warranty Surveyor wi l l issue t he fol lowing st atus report s t o t he Contr actleader(s) direct at key r isk mil estones:

    t he mar ine warranty survey act iv i t y car r ied out in t he per iod;

    the mar ine warranty survey act iv i ty p lanned pr ior to the next r iskmi lestone;

    copies of Cert i f i cate(s) of Approval issued since t he last report .

    I f the Assured has provided insuff icient information to perform a comprehensive review ort he Marine Warrant y Surveyor s quest ions/ request s for i nform ation rem ain pending, t henthe Marine Warranty Surveyor shall make this clear in his reports to Underwriters andoutl ine the potential implicat ions of the omissions.

    1.11 All equipment and vessels associat ed wit h load-out, transport at ion and instal lat ionactivit ies shall be ful ly operat ional and used within their safe working l imits, which shall beagreed by t he Marine Warrant y Surveyor . All vessels (incl uding off shore cranes, pipel ayvessels, r igs and flotels) to be in IACS Class. Marine Warranty surveyor to agree alloutstanding Class it ems as not m ater ial t o int ended operat ions. Marine Warranty surveyorto approve l imit ing metocean cr iter ia, and weather windows for al l marine operat ions.

    2 Role of the Assured

    2.1 Once appointed on t he proj ect the Marine Warranty Survey Company shall not bechanged wit hout t he express and pr ior agreement of t he Cont ract leader(s).

    2.2 The Assured shall provide t he Marine Warranty Surveyor wit h a point of contact forthe Contract leader(s) and an appropr iate point of contact in the Assureds organisation toassist wit h the resolut ion of quer i es.

    2.3 The Assured wil l provide Contr act leader(s) wit h t he contact detai l s of t he MarineWarranty Surveyor(s) wi t hin 14 working days fol l owing appointm ent of t he same.

    2.4 The Assured wil l provide t he Marine Warranty Surveyor(s) wit h t he contact detai lsof Cont ract l eader(s) wit hin 14 working days fol lowing appointm ent of t he same.

    2.5 The Assured shall procure Marine Warranty Surveyor part icipat ion at al l relevantproj ect management meet ings, including marine operat ion HAZOPs/ HAZID, cont ingencyplanni ng and assurance/ t est ing plans.

    2.6 The Assured shall contr act the Marine Warranty Surveyor direct ly (wit hout t heinvolvement of any contractor or intermediary) unless required to enable compliance withthe law in the jur isdict ion or government regulat ions.

    2.7 The Assured shall appoint a single Marine Warrant y Survey Company f or t he ent irescope of w ork herein.

    3 Role of t he Underwri ters

    3.1 The Panel of Marine Warrant y Surveyor s is t o be agreed by t he Cont ract leader(s).

    Ot her addi t ions t o the panel wi l l need t o demonstrat e t heir capabi l i ty / exper ience ofsimi lar proj ects and wat er dept hs, and t o be agreed by the Cont ract l eader(s).

    3.2 On each proj ect Underwri ter s wil l specif y whet her a Kick Off meet ing is requiredbet ween Underwrit ers, t he Assured and the Marine Warranty Surveyor. The Assured,

    Contract leaders and Marine Warranty Surveyor shall agree key risk milestones and date(s)for a j o int review of the pro j ect scope and development .

    3.3 At t he request of the Marine Warrant y Surveyor, Underwr it ers wil l make available:

  • 7/29/2019 JR2010010 Marine Warranty Surveyors CoP[1].pdf

    6/14

    A Joint Committee of the IUA and LMA

    The PSOW, otherwise the GSOW to be used;

    relevant applicable policy terms and condit ions including, in part icular, anywarrant y provisions or condit ions precedent;

    identity and contact detai ls ( including telephone, e mail, fax and out ofhours numbers) of the nominated Contract leader(s) to receivecomm unications from the Marine Warranty Surveyor.

  • 7/29/2019 JR2010010 Marine Warranty Surveyors CoP[1].pdf

    7/14

    A Joint Committee of the IUA and LMA

    GENERIC SCOPE OF WORK (GSOW)

    Proj ect Activi t y Review and

    approve:1 Procedures2 Dwgs3 Design Calcs4 Analysis

    Attend Issue

    Cert if icate ofApproval

    GENERAL ACTIVITIES

    Metocean cr i ter ia, i ncluding l imi t ingseast ates, for al l m arine operat ions.

    X

    Weather for ecast ing procedures X

    Weight report s and weight cont ingencyfac to rs

    X

    Procedures for use of installation vessels/ equ ipment inc. ROVs, ROV t oo l ing, pi lehammers, etc.

    X

    Tow rout es/ passage plans / fuell ingplans and saf e havens

    X

    Loadout Manual(s)including ballast plan,quay strength, vessel strength andintact and damaged stabil i ty.

    X

    Transportation Manual(s) includingbollard pull requirem ents, vesselst rength and intact and damagedstabi l i ty .

    X

    Inst al lat i on Manual(s) including

    instal lat ion vessel thruster rel iabi l i tyand operat ional procedures, stat i onkeeping/ moor ing ar rangements

    X

    HUC and Proj ect handover X

    Suff iciency of dat a acquisit ion & t est ingfor soi l / rock mechanics andgeotechnical paramet ers at proposedlocat ions for f oundations of al linstal lat ions.

    X

    Adequacy of structures to withstandloads dur ing loadout, tow andinstal lat ion operat ions

    X

    Design codes and recomm endedpract ices

    X

    Proj ect QA/ QC procedures XManagement of Change procedu res XProj ect Communicat ions and Interf aces XInst allat ion vessels suit abili t y surveys X X

    Tugs / barges suit abil it y surveys X XEmer gency cont ingencies X

    Project Phase Review &Approve

    1.Procedures2.Dwgs.3.Design Calcs.4.Analysis

    Attend IssueCert if icate of

    Approval

  • 7/29/2019 JR2010010 Marine Warranty Surveyors CoP[1].pdf

    8/14

    A Joint Committee of the IUA and LMA

    FIXED PLATFORMS

    a) Fabrication and Loadout

    Barge and cargo st abil it y XBall ast ing syst em and proced ures X

    Barge anchored whilst loaded and

    mooring dur ing loadout / loaded (incl.Fendering)

    X

    Moti ve power syst ems (winches, t rai lers,e tc )

    X

    St ruct ural str engt h of skidding system ort ra i lers

    X

    Link beam/ br idge design XRigging and li f t point design X

    Capabil i t y and cert i f i cat ion of cranes XGril l age st ruct ural checks X

    Wat er depth, t ida l l imi t at ions XCer t i f icat ion of a l l loadout equipment X

    Emer gency cont ingency plans XBall ast system t rial s XLoadout operat i on X Xb) TransportationProcedure for depar ture ( incl draf t ,t ida l , environmental l imi t s)

    X

    Moti on Response anal ysis X

    Grillage and Seafasteni ng design,including Fatigue design considerations( incl NDT documentat ion)

    X X X

    Firef ight ing, Life saving and emergencyequipment f or manned tows

    X X

    Emergency anchors and mooring

    including, mount ing and release syst em.

    X

    Internal seafast enings / voyageprotect ion

    X X X

    Cargo t owage / Transport at ion X Att endSailaway

    Issue C of Afor Sailaway

  • 7/29/2019 JR2010010 Marine Warranty Surveyors CoP[1].pdf

    9/14

    A Joint Committee of the IUA and LMA

    Project Phase Review &Approve1.Procedures2.Dwgs.3.Design Calcs.

    4.Analysis

    Attend IssueCert if icate of

    Approval

    c) InstallationSit e/ seabed survey and water dept h

    X

    Jacket launch system and equipm ent X X XJacket Launch operat ion X X X

    Jacket upendingX

    X

    Template dockingX

    X

    Jacket on-bot t om st abi l i tyX

    Jacket buoyancy tank removalX

    St at ic and dynami c hook loadcalculat ions(single and dual crane l i f t s) includingli f t ing through water considerat ions.The independent l i f t ing calculat ionsperformed shall include environmentall imitat ions and be in accordance witht he approved crane(s) curves. All l i f t ingfactors shall be approved by MWS

    X

    Lift ing equipment design and

    cer t i f i ca t ion X

    Jacket Instal lat ion ( inc. Hydrostat icCollapse Check) X X X

    Integrated deck / MSF / Module Lif t / Floatover X

    X X

    Li f t po intsX

    Bumpers and guiding syst em sX

    As-bui l t d imensions of j acket / moduleinter faces

    X

    Piling calculations, analysis andInst al lat i on Manuals

    X X(extent of

    at tendanceduring pi l ingt o be agreed)

    Installation vessel positionmon i to r ing / con t ro l X

    Crane suit abil i t y - Crane(s) to beinspected pr ior t o l i f t ing operat ionst aking place.This inspect ion shall include but not be

    l imi t ed to; Crane Cer t i f icat ion andVessel Class; operat ing hi st ory,maint enance and repair records forCrane and Marine system s ; An ext ernal

    XX

  • 7/29/2019 JR2010010 Marine Warranty Surveyors CoP[1].pdf

    10/14

    A Joint Committee of the IUA and LMA

    Project Phase Review &Approve1.Procedures2.Dwgs.3.Design Calcs.4.Analysis

    Attend IssueCert if icate of

    Approval

    visual examinat ion of t he Crane(s) andVessel.Float ing Cranes DP & Ball ast system st r ia ls X

    X X

    Tug configurat ion XEmergency contingencies

    X

    Launch preparat ions includingseafastening removal and bargeballast ing

    XX X

  • 7/29/2019 JR2010010 Marine Warranty Surveyors CoP[1].pdf

    11/14

    A Joint Committee of the IUA and LMA

    Project Phase Review &Approve1.Procedures2.Dwgs.3.Design Calcs.

    4.Analysis

    Attend IssueCert if icate of

    Approval

    FLOATING STRUCTURES

    a) Fabri cati on and SailawayVessel condit ion X

    Mooring adequacy in yard ( to withstandnatural hazard exposures e.g. typhoons) X

    X(At t end to

    conf i rminstal ledmooring)

    X

    Cargo st owage and securin g X X X

    St ructura l st rengt h/ fat igue XTowing equipmentX

    X

    Dry t ransport vessel suit abil i t y X X

    Vessel Sailaw ay At t endSailaway

    Issue C of Afor Sailaway

    b) TransportationCert if icat ion and documentat ion XTransportat ion route and weathercondi t ions

    X

    Bunkering XTug or prop ul sion syste m s X X

    St abil i t y, ballast ing and wat ert ightin tegr i t y

    X

    Vessel Mot ion s XSeakeeping/ heading control XNavigat ion li ghts and shapes X

    Emergency contingencies and equipment( incl . safet y equipment) X

    X

    Communications and navigationalequipment X

    X

    Manning Xc) Installation

    Installation anchors and mooring

    system

    X X X

    St at ion keepin g Moorin g/ DP/ Tet hers XHook up wit h infrastruct ure X X XLift ing equipment design andcer t i f icat ion X

    Module Lif t s at off shore sit eX

    X X

  • 7/29/2019 JR2010010 Marine Warranty Surveyors CoP[1].pdf

    12/14

    A Joint Committee of the IUA and LMA

    Proj ect Activi t y Review andapprove:1 Procedures2 Dwgs3 Design Calcs

    4 Analysis

    Attend IssueCert if icate of

    Approval

    RIGID PIPELINES

    a) Fabrication and Load-outPipe j oint / reel stor age and handling X X XPipe loadi ng and uploadi ng X X

    Pipe barge sailaw ay X Xb) TransportationSeaf aste nings X X X

    c) InstallationSt art -up and Term inat ion X X X

    Instal lat io n aid s DMA, A & R head X

    Assess pipelay equipment and machineryfor adequacy. Witness t ensionercal ibrat ion.

    X X X

    Pipe lay Vessel s DP Tri al s X X XPipelay (including lay, expansion,stability and free-span analysis)

    X X(Underwr i terswi l l s t ipulate

    i f f u l la t t endance is

    required)

    X

    Pipeline Installation Analysis (To bereassessed if confi gurati on changes i. e.st inger changes)

    X

    Laydown ( including preservat ionprocedures for long laydowns and metocean cr i t er ia for commencement oft emporary laydown)

    X X(If laydown

    per iodant ic ipated to

    exceed 1month)

    X

    Buckle avoidance and detect ion st rat egyinc. pipeline tension, load cellca l ibrat i on, and D/ t l im i tat ions.

    X

    Fie ld j o int coat ing X

    Crossin gs X X XTrenchi ng and backf il l in g X X XSlope stabil isat ion, m att ress protect ion,rock dumping

    X

    Tie- in XShore approach/ pull- in design includingdredging and backfi l l ing.

    X

    Horizontal Dr i l l ing at shore approach XCle anin g and Gauging X X

    Pressure t esting procedu re X X XCont ingencies incl uding Abandonmentand recovery and Dry/ Wet buckle

    X

  • 7/29/2019 JR2010010 Marine Warranty Surveyors CoP[1].pdf

    13/14

    A Joint Committee of the IUA and LMA

    Proj ect Activi t y Review andapprove:1 Procedures2 Dwgs3 Design Calcs

    4 Analysis

    Attend IssueCert if icate of

    Approval

    SUBSEA EQUIPMENT, UMBILICALS,FLOW-LINES and RISERS

    a)Fabrication and Load-outManuf act urers reeli ng/ spooli ng X X XLoad-out X X X

    b) TransportationTransport ati on incl uding sea-f ast ening X X Xc) Installation

    Inst al lat i on l ines ( Including St at ic anddynamic analyses for al l f lexibl eumbil ical, f low-l i nes and r isers)

    X X X

    Ancillary items such as buoyancymod ules, VIV st rakes and clamp s.

    X

    On-bott om stabil i t y, crossing, slopestabil i ty, free-spans

    X

    Suct ion pil es (fo undat ions/ anchors) X X XInst a l la t ion equipment ( l i f t ing andlower ing), docking and posit ioninganalyses)

    X X X

    Pipe spool, j umper inst al lat ion X X(For

    Deepwater> 500m)

    X(For

    Deepwater> 500m)

    Manifo ld/ t ree and other hardware

    insta l la t ion

    X X X

    Temporary inst al lat ion aids, r igging etc. XRiser / umbi l ica l / power cable pul l - in . X X X

    Riser install at ion at plat f orm / FPSO X X XHook-up, comm issioning and proj ecthandover. Including hydrot est s.

    X

    Contingency procedures for recovery ofdamaged subsea components

    X

    QA/ QC non-conformance report s X

  • 7/29/2019 JR2010010 Marine Warranty Surveyors CoP[1].pdf

    14/14

    A Joint Committee of the IUA and LMA

    Proj ect Activi t y Review andapprove:1 Procedures2 Dwgs3 Design Calcs

    4 Analysis

    Attend IssueCert if icate of

    Approval

    VESSEL ACTIVITY DURINGCONSTRUCTION PERIOD

    a) All Proj ect Vessels (Inc. Semi-SubRigs and Flot els)

    Anchoring if wi t hin 500m of ProjectFacil i t ies (Plat form s, Templ ates / Manifolds / Pipelines))

    X X X

    Vessels operat ing on DP wit hin 500m ofExist ing Proj ect Facil i t ies, including DPsystem adequacy, redundancy andcondi t ion

    X X(Attend DP

    Trials)

    X

    b) Jack-Up RigsSuf fi ciency of Soil Anal ysis for Jack-UpRig puncht hrough assessment .Independent punchthrough r iskassessment and mi t igat ion m easures.

    X

    Risk Reduction measures (well shut-in,blowdow n, pi peline depressur isat ionetc. ) for Jack-up move onto / of flocat ion.

    X

    Rig Move - Jack-Up / Jack DownOperations

    X X X

    Key

    X Denotes act ivi ty t o be perform ed

    DMA Dead man anchorA&R Abandon and recoveryVIV Vortex Induced Vibrat ionHUC Hook-up and comm issionin gNDT Non Dest ruct ive Test ingDP Dynami c Positio ning

    JR 2010/01023 July.2010