jtls international user conference jtls 5.0 status mrs. ellen roland
TRANSCRIPT
JTLSInternational User Conference
JTLS 5.0 Status
Mrs. Ellen Roland
• Unfortunately There Is Only One Word
JTLS 5.0 Status
July 2015 2Copyright 2015, ROLANDS & ASSOCIATES Corporation
• We Always Knew– It Was An Aggressive Schedule– Cost Was Bare Bones Minimum
• Still– We Decided To Do It Correctly
• Implemented New Logic• Attempted To Remove Model Inconsistencies
JTLS 5.0 Status
July 2015 3Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Beta Copies– JTLS 5.0.0.R
• Friday 11 July 2015
– JTLS 5.0.0.S• Friday 25 July 2015
– Updates Approximately Every Two Weeks
Plan Of Way Forward
July 2015 4Copyright 2015, ROLANDS & ASSOCIATES Corporation
5
• Removal Of Hexagon Game Board– Grid Layers / Network Overlays– Worldwide Representation
• Testbed For JLVC 2020 Services– JTLS Already Wed Enabled / Cloud Capability– Move Functions From Individual Programs
• Services• Monitored and Controlled By Web Services Manager
JTLS 5.0 Basic Overview
July 2015 Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Committed To Network Overlay– Multiple Networks
• Road, River• Must Leave One, Travel Off Network, Get On Next
– Multiple Independent Networks• Rail, Pipeline• No Need To Go From One Network To Next
– Single Worldwide Network• Air Corridor, Sea Lanes
JTLS-2012-11184Model Road Network
July 2015 6Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Basic Design– All Networks– When The Model Starts
• Compute Which Arcs Cross Which Boundaries
– Once Data Is Established• Implementation Is Easy• Won’t Leave Node Unless Arc Is Legal
– Boundaries Are No Longer “Hex” / “Grid” Edges• Implement Cross Lines Algorithm
JTLS 2013-11744Air Corridors Recognize National Boundaries
July 2015 7Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Part Of Network Movement Plan– Sea Lanes Work Much Like Air Corridors– Each Sea Lane Have A Width
• Unlike Aircraft, They Stay Close To Sea Lane
– Once Off Network• Naval Units Travel Great Circle Path• Won’t Enter Grid
– Too Shallow– Not Ocean, Small Island, or Dual Capable
• Won’t Cross Barrier
JTLS-2011-10933Maritime Supply Routes
July 2015 8Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Biggest Issue - River Data– Nodes Do Not Connect In Raw Data– No Good Depth Information
• Seasonal Depth An Unreachable Goal For Now
• Once Data Exists– Travel On Rivers – Straight Forward– Crossing Rivers When Off Road
• Crossing Line Algorithm
JTLS-2006-1659River Networks
July 2015 9Copyright 2015, ROLANDS & ASSOCIATES Corporation
• All Networks Will Be Displayable• Road Networks
– Bridges and Tunnels Are Arcs– Road Interdiction Points Nodes
• Current Plan
JTLS-2006-1706Large Map Road Networks
July 2015 10
Sea Lanes
Roads
PipelinesAir
NB
River
Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Air– Already Done – Air Corridors
• Sea– Covered By JTLS 2011-10933
• Satellite– JTLS 4.1 Hex-By-Hex – Game Board Only– Worldwide Coverage – Satellite Service
JTLS-2010-10514Air, Sea, Space Smooth Movement
July 2015 11Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Problem– Very Few Truly Impassable Barriers
• Trucks May Not Cross• HRUs On Foot Can
– Introduced Concept Of Barriers• Used To Be Fixed Types – Along Hex Edges• New Data
– Barrier Types (BT) – Ex: Impassable, Tank Ditch, Shore– Agility Types (AGT) – Ex: Tracked, Wheeled, Foot– Ability To Cross – MCP BT AGT
JTLS 2013-11440Terrain Movement Function Of Combat Systems
July 2015 12Copyright 2015, ROLANDS & ASSOCIATES Corporation
JTLS 2013-11440Terrain Movement Function Of Combat Systems
July 2015 13
Road Arc
Road Node
Road NodeWith Target
Barrier
Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Request– Remove Constant Light On Entire Game Board
• Sunrise / Sunset Data Removed• Model Will Compute Light Condition
– Latitude / Longitude– Date Time Group
• WHIP Shows– Terminator As Terrain Layer
JTLS-0151Constant Sunrise / Sunset Time
July 2015 14Copyright 2015, ROLANDS & ASSOCIATES Corporation
JTLS-0151Constant Sunrise / Sunset Time
July 2015 15
Determination- Location- Date/Time
Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Concept Of Execution Plans– Existed For
• Naval, Formations, HRUs
– Expanded For• Ground Units, Convoys, and Air Missions
• All Ground Directives Are Redesigned– Ingress Path, Task Location, Egress Path– Task Execution Time
JTLS-0017Ground Directive Egress Route
July 2015 16Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Changed All Execution Plans– Good Reasons
• Centralize Code• Capability Consistency
– Issues• Made Job Larger – More Time Needed
– Objects• Ground Units, Ships, Formations, HRU, Convoys,
Air Missions
JTLS-0017Ground Directive Egress Route
July 2015 17Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Pending Task Display– Each Route Point Is A Task– Each Unit Status Change Is A Task– Temporary Entities
• Air Mission and Convoy– Mission Complete Task
JTLS-0017Ground Directive Egress Route
July 2015 18Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Ground Units On IMT– Pending Task Quick Retrieval Button– View Pending Tasks
• Ground Unit Can Have Multiple Pending Tasks
JTLS 2013-11679Ground Execution Plans And Viewer
July 2015 19Copyright 2015, ROLANDS & ASSOCIATES Corporation
• All Orders Changed To Include– Start Time– Arrive Time
• Complicated Computation– On Road Network / Off Road Network
– Sequential• Task Sequence Number
– Now• Changed – No Longer Deletes All Tasks
JTLS-2008-1829Ground Move Arrival Time
July 2015 20Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Previous ECP Addresses All Issues
JTLS 2011-10936IMT Future Unit Order Display
July 2015 21Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Previous ECP Addresses All Issues• Withdraw Route Has Points
– Each Point Becomes A Task
JTLS-0536Ground Withdraw Route Points
July 2015 22Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Ground Route– Location– Optional Leave Time
• Absolute – 300447MAR15• Relative Time – 2 HR
• Technically Easy– Relative To Arrive Time Issues
JTLS-2010-10702Ground Route Wait Times
July 2015 23Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Previous ECP Addresses All Issues
JTLS-0147Display Current Engineering Task
July 2015 24Copyright 2015, ROLANDS & ASSOCIATES Corporation
• WHIP Improvement– IMT Context Sensitive Orders
• Bring Up Air Mission IMT Panel• Highlight Desired Air Missions • Right Click – Select Cancel Air Missions• Missions Placed In Spreadsheet Panel• Fields Can Be Edit• Send Button
JTLS 2014-12231Cancel Multiple Air Missions
July 2015 25Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Same WHIP Improvement– Bring Up Refuel Chit IMT Panel
• Numerous Spreadsheets Implemented– Easy To
• Add• Delete
– Indicate Any Changes
JTLS-2006-1764IMT Panel Modify/Delete Refuel Chits
July 2015 26Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Basic Concept– Air Mission Execution Plans Like Navy / HRU
• Initial Order– Alert– Initial Mission Type With Required Data– Multiple Task Option
• No Longer Strictly Tied To Mission Type– Can Change At Any Time– Can Be Scheduled To Change
– All Future Orders Viewable On IMT
JTLS-2006-1630Multiple Mission Air Orders
July 2015 27Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Old– Attack, Armed Recce, OAS– CAP, Escort– Airlift, Air Transport, Strategic Lift, Insert/Extract– AWACS– Air Refuel– CAS– Recce– EC – Transfer– Mine Warfare
– Patrol– Wild Weasel
Proposed Mission Type
July 2015 28
• Proposed– Offensive - OAS– Defensive Counter Air - DCA– Mobility – MBLTY– AWACS - AWACS– Air Refuel – REFUEL– CAS - CAS– Recce - RECCE– EC - EC– Transfer – XFER– Mine Laying - MLAY– Mine Clearing - MCLEAR– ASW - ASW– SEAD - SEAD
Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Old– TTG– Air-to-Air– Lift– AEW– Tanker– CAS– Recce– Jammer– General– Mine Laying– Mine Clearing– ASW– Cruise
Load Assignment Array
July 2015 29
• Proposed– TTG– Air-to-Air– Lift– AEW– Tanker– CAS– Recce– Jammer– General– Mine Laying– Mine Clearing– USW– SEAD
Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Completely Different Order Panel– Has Not Changed
• Either– Name Of Squadron– Launching ICAO – Squadron Created If Required
– Becomes Transfer Mission– As With Any Mission
• Mission Type Can Change
Civilian Air Mission Order
July 2015 30Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Same Concept As Ground Units– Can View Pending Task List– Input
• Ingress Route – Each Point Becomes Task• One Or More Tasks – Each Task Is List• Egress Route – Each Point Becomes Task
– Once In The Model• Concept Of Ingress / Egress Gone• Simply Add/Delete Points (Tasks)
JTLS 2013-11680Air Mission Execution Plans
July 2015 31Copyright 2015, ROLANDS & ASSOCIATES Corporation
• ECP Addresses Air Missions• Pending Task Display
JTLS-0321Display Current Operations
July 2015 32Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Currently Cannot Represent– Logistics Alert Missions– Alert Air Mission Packages
• Every Air Mission Can Be Placed On Alert– Automatic Assignment – CAP And OAS/CAS– No Automatic Assignment – All Other Missions
• When Player Wants It To Go – Specify Desired Task
JTLS-2009-10396Full Mission Type Alert Capability
July 2015 33Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Alert Packages– Air Mission Package - Timing Options
• Time On Target – Same As Existing Capability• Alert• Airborne Alert
– When Forming Package Mission - Three Choices• Define New Mission• Use Alert Mission• Use Current Flying Mission
– Each Mission In Package Has Its Own Choice
JTLS-2009-10396Full Mission Type Alert Capability
July 2015 34Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Since There Is No Game Board– Automatically Implemented
JTLS-2009-10335Alert Missions Off Game Board
July 2015 35Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Problem– Allow Orbiting Missions Go Back On Alert
• Solved By Execution Plans– Add an Alert Task
• As Part Of Initial Order• As Part Of Modify Mission Task Order
– Can Be Done As Often As Needed
JTLS-2010-10543Robust Use Of Alert Missions
July 2015 36Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Previous ECP Addresses All Issues
JTLS-0202Reserve Air Assets
July 2015 37Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Problem– Stop CAS Mission– Have It Go Back To
• Orbiting OAS• Alert• Different CAS Support
• Previous ECP Addresses All Issues– All A Part Of Modify Mission Tasks
JTLS-0197Enhance CAS Current Operations
July 2015 38Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Previous ECP Addresses All Issues– All A Part Of Modify Mission Tasks
JTLS 2013-11750Change Attack To OAS
July 2015 39Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Previous ECP Addresses All Issues– As Part Of Initial Air Order
• ATOT
– Part Of Modify Mission Tasks
JTLS-2008-10101Multiple Orbit Points
July 2015 40Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Problem– Allow Mission To Do Multiple Tasks
• Airlift Supplies• Airlift Portion Of Units• Airlift HRUs• Change At Any Time
• Combined– Airlift, Air Transport, Insert / Extract– Mobility Mission
JTLS-2006-1619Improve Airlift/Airdrop Order
July 2015 41Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Previous ECP Addresses All Issues
JTLS 2013-11723More Control Over Airlift Missions
July 2015 42Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Previous ECP Addresses All Issues– Part Of Modify Mission Tasks
• ECP Only Says Airlift Supply– Supply Pickup / Delivery Locations Can Be Changed– Insert / Extract HRU Locations Can Be Changed– Airlift Unit
» Before First Load Picked Up» Pickup Location Can Be Changed
» Before First Load Dropped Off» Dropoff Location Can Be Changed
JTLS-0076Airlift Supply Alternative Landing Location
July 2015 43Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Previous ECP Addresses All Issues– Pending Task IMT Panel– Cannot See
• Exactly Supplies To Be Picked Up Or Dropped Off– Air Movement Report Contains This Information
• Exactly Supplies Current Held By Mission Available
JTLS-2010-10481Air Transport Plans On IMT
July 2015 44Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Previous ECP Addresses All Issues
JTLS-2009-10392View Transport Instructions
July 2015 45Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Landing Point As Part Of Plan– Land Task - Location or Unit Name– Refuel Task
• Optional – Specified As Part Of Order
– Rearm Task• Optional – Specified As Part Of Order
– Takeoff Task• Relative Time – 2 Hours• Absolute Time – 292135MAR15
JTLS-2009-10278Robust Transit Landing Points
July 2015 46Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Previous ECP Addresses All Issues– Applies To
• Wait – Ground Based Delay• Hold – Airborne Based Delay
– Modify Mission Task• Can Change Time – Longer Or Shorter• Can Delete Task
• Consistently Apply To All Object Tasks
JTLS-2009-10275Air Mission Relative Wait Points
July 2015 47Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Previous ECP Addresses All Issues– Use Modify Mission Task Order
• Change Wait Time• Delete Wait Task
– Applies To• Wait – Ground Based Delay• Hold – Airborne Based Delay
JTLS-2008-10091Change Or Remove Route Wait Times
July 2015 48Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Previous ECP Addresses All Issues
JTLS-2006-1711Change Holding Aircraft Departure Time
July 2015 49Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Problem– Operational Plan - Bring Fuel Into Theater– Air Transport Missions
• Would Bring In Fuel• Refuel – Taking Fuel Back Out Of Theater
• Previous ECP Addresses All Issues
JTLS-0435Optionally Refuel At Mission Stop
July 2015 50Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Previous ECP Addresses All Issues– Use Modify Mission Task Order
• Delete Refuel Task
– If Canceled While Executing• No Fuel Transferred
JTLS-2010-10465Mission Base Fuel Cancellation Option
July 2015 51Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Execution Plan Available On IMT– Speed And Altitude For Any Leg
• IMT Context Sensitive Orders Addresses The Issue
– Change Heading – Will NOT Be Implemented• Travel Bearing 0330
– 10 Mile– 15 Minutes
JTLS-0502Changing Heading, Speed, Altitude
July 2015 52Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Background– Each Air Mission Order Has Ability To Enter
• Single Task – This Is “Primary” Task• Multiple Tasks
– First Task In List Is “Primary Task”
– Time On Task / Time On Target (TOT)• Time For “Primary Task”
• Several Options
JTLS-2009-10108Alter Air Mission TOT
July 2015 53Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Option 1 – While In Scheduled Or Pre-Launch– Modify Mission Task
• New TOT– Scheduled
» Recompute Mission Resourcing Event and Launch Event– Pre-Launch
» Recompute Mission Launch Event
JTLS-2009-10108Alter Air Mission TOT
July 2015 54Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Option 1 – While In Scheduled Or Pre-Launch– Modify Mission Task (Con’t)
• Change Task Execution Time– Scheduled
» Mission Resourcing Event – Does Not Impact Launch» Launch Event – Mission Early Or Late To TOT
» Speed Not Adjusted Automatically– Pre-Launch
» Launch Event – Mission Early Or Late To TOT» Speed Not Adjusted Automatically
JTLS-2009-10108Alter Air Mission TOT
July 2015 55Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Option 2 - After Mission Has Started– Add Mission Task
• Add Hold Point• Add Landing Point
– Change Speed Of Mission
JTLS-2009-10108Alter Air Mission TOT
July 2015 56Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Previous ECP Addresses All Issues– What We Do Not Currently Have
• Delay Relative – 3 Hours
– Only Allow• Absolute Delay – 292015MAR15
JTLS-0561Delay Pre-Launch Mission
July 2015 57Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Concept Of Routes Removed From Model– Exist In The Order– Once It Reaches The Model
• Simply Becomes Series Of Tasks• Currently Delete Point-by-Point• Use Spreadsheet Capability
– Highlight Points– Right Click– Delete Task Spreadsheet
JTLS-2008-10094Cancel Route Instead Of Replace Route
July 2015 58Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Previous ECP Addresses All Issues
JTLS-2006-1766Cancel Egress Route Option
July 2015 59Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Not Implementing As Packages– Air Mission Package Will Not Change
• Timing– Rendezvous Point– Time On Target– Time On Target Period (NET / NLT)
• Missions– Attack– Escort, SEAD, Post-Strike Recce
JTLS-0203Packages Without Air-Ground Missions
July 2015 60Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Implementing Shadow Task– Give Mission Shadow Task – New Order
• Primary Task– Allowed:
» OAS, DCA, AWACS, REFUEL, RECCE, EC, SEAD– Not Allowed
» Mobility, CAS, Transfer, Mine Laying, Mine Clearing, ASW
• Mission To Shadow• Task Start Time - Mandatory
JTLS-0203Packages Without Air-Ground Missions
July 2015 61Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Implementing Shadow Task– Give Mission Shadow Task – New Order (Con’t)
• Rendezvous Point – Optional– If Not Specified – Intercept Path
• Land Flag– Yes – Lands When Shadow Mission Lands– No – Holds Above Landing Location
JTLS-0203Packages Without Air-Ground Missions
July 2015 62Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Implementing Shadow Task (Con’t)– Give Mission Shadow Task – New Order (Con’t)
• Task Completed– Absolute Time– Relative Time– Shadowed Mission
» Killed» Completes
– Task Canceled By Player Order
JTLS-0203Packages Without Air-Ground Missions
July 2015 63Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Vietnam Era Mission Profile– Concept
• Take Off From Carrier• Head To Inbound Tanker• Hit Target• Head To Outbound Tanker• Head Home To Carrier
– If You Miss Inbound Tanker• Abort To Emergency Refuel Location
JTLS-0120 Change Emergency Refuel Location
July 2015 64Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Problem– Cannot Change – Emergency Refuel Location
• Solution – Remove The Concept Of Emergency Refuel
JTLS-0120 Change Emergency Refuel Location
July 2015 65Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Problem– Model Automatically Selects Refuel Location– Player Cannot Tell Who This Is
• Solution– Every Mission Task Has
• Associated Object – Shown On IMT
– Mission Has Refuel Task and Associated Object• Base Fuel – Is Base / Carrier / FARP• Tank Fuel – Is Tanker
JTLS 2013-11721Air Mission Refuel Unit Information
July 2015 66Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Side Note– Using Modify Mission Task Order
• Associated Object Can Be Change• This Means User Can
– Change Selected Refuel Base Or Tanker
JTLS 2013-11721Air Mission Refuel Unit Information
July 2015 67Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Problem– A Mission Showed Destination 2 On IMT– Confusing Because Meaning Different
• Mission Type• Different Mission Postures
• Solution– Removed Entire Concept Of Destination 2– Mission Pending Task List Shows All Information
JTLS-0170IMT Destination 2 Location Improvement
July 2015 68Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Example - Orbiting Mission– Old Method
• Destination 1 – Start Orbit• Destination 2 – End Orbit
– New Method• Task Launch• Task Orbit – Start Lat/Long• Task Orbit – Transit Point 1 Lat/Long• Task Orbit – Transit Point 2 Lat/Long• Task Orbit – End Lat/Long
JTLS-0170IMT Destination 2 Location Improvement
July 2015 69Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Problem– Air Mission Has Target Type List – What To Hit– On Initial Order– Cannot Be Changed
• Solution– Two Current Operations Order For Air Missions
• Change Mission Parameter– Mission TTL Added To This Order
• Modify Mission Task
JTLS-2009-10284TTL Change To Flying Mission
July 2015 70Copyright 2015, ROLANDS & ASSOCIATES Corporation
• No Hex Edges– Shore Lines Are Polylines Line As Described– Player Must Input
• Formation Location• Assault / Pickup Location• Barrier That Will Be Crossed (Optional)• Assets To Be Used
– Port, LOTS, Small Boats, Helicopters
• All Model Decisions Will Be Removed
JTLS 2012-11366Amphib Operation Specify Formation Location
July 2015 71Copyright 2015, ROLANDS & ASSOCIATES Corporation
Amphibious Example
July 2015 72
Shore LCAC
Shore
Landing Point
FormationAssault Point
Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Ship Execution Plans– Each Move Point Is Displayed As Task
• Task Has Location And Speed
– Modify Sea Task Order• Task Number• Change Speed
• Planned– IMT Order Panel Context Sensitive Menu
• Highlight Specific Leg• Change Speed And Send
JTLS-2008-10023Ship Route Movement Speed
July 2015 73Copyright 2015, ROLANDS & ASSOCIATES Corporation
• New Symbol– Represents Formation Center– Formation Center Is Displayed – Ability To
• Highlight All Ships– In The Formation Whether Ob Station Or Not
• Filter
– Not Detectable• Side Knows Formation If One Ship In Formation
JTLS-2006-1763Display Formations On WHIP Map
July 2015 74Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Right Click On – Formation Center Symbol– Formation Name On IMT
• Order List Appears– Select Desired Order
JTLS-2006-1762Formation Context Sensitive Menus
July 2015 75Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Convoys Will Work Like Air Missions– Support Unit– Number Assets– Leave Time– Route– Supplies
• Model Will Still Generate Automatically
JTLS 2011-10935Create Convoy At Future Time
July 2015 76Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Convoys– Have Pending Task List Like All Objects
• Task Resource– Currently Happens At
» Leave Time Prior – Load Time– No Concept Of Early Resource Time Like Air Missions
JTLS 2011-10935Create Convoy At Future Time
July 2015 77Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Convoy Order– Combined
• Directed Resupply Order• Mandatory Resupply Order
– Directed Resupply Order• Single Task• Multiple Tasks• Mandatory Becomes A Field For Entire Order
JTLS 2013-11755Give Convoys Specific Routes
July 2015 78Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Centralize Code For Loading / Offloading– MHE – Specific Assets Available– ELF – Unit Loading Or Offloading– Convoy By Itself
• One ELF Assumed
JTLS-0467Multiple Destination Convoy ELF Usage
July 2015 79Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Currently All Convoys Show As Destroyed– Destroyed Says Removed From Game– Model Distinguishes Between
• Destroyed, Completed, Canceled
– When Convoy Is No Longer• Removed From Game• Stays On IMT Until It Is Refreshed• Last Posture Will Show Reason Convoy Is No Longer
JTLS-0185Distinguish Between Destroyed and Returned Convoys
July 2015 80Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Unit Posture Data– UP.UP.LANCHESTER.DATA.SET– CCP.CS.UP.DENSITY.MODIFIER– CCP.SC.UP.TT.DENSITY
• Inactive Unit Posture– ATTACHED– OUT_OF_GAME– WIPED_OUT
JTLS 2014-12225Remove Impossible Unit Posture Data
July 2015 81Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Problem– Unit Posture Data
• UP.UP.LANCHESTER.DATA.SET• CCP.CS.UP.DENSITY.MODIFIER• CCP.SC.UP.TT.DENSITY
– Inactive Unit Posture• ATTACHED, OUT_OF_GAME, WIPED_OUT
• Solution – Remove Data From Database
JTLS 2014-12225Remove Impossible Unit Posture Data
July 2015 82Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Problem– Contamination For Only One Hex– Inappropriate For Hexes – Even More Inappropriate - Grids Different Sizes
• Solution– Circular Pattern – TW RADIUS OF EFFECTS
JTLS 2013-11470Contaminate / Decontaminate Multiple Hexes
July 2015 83Copyright 2015, ROLANDS & ASSOCIATES Corporation
JTLS 2013-11470Contaminate / Decontaminate Multiple Hexes
July 2015 84Copyright 2015, ROLANDS &
ASSOCIATES Corporation
• Each Covered Grid– Tagged– When Unit Enters Grid
• Check For Tag• Then Check Distance
JTLS 2013-11470Contaminate / Decontaminate Multiple Hexes
July 2015 85Copyright 2015, ROLANDS & ASSOCIATES Corporation
• JOI Component In Controller WHIP– Access
• To Command Hierarchy• To Map• Limit WHIP Access
• TOI Postponed As Web-Controlled Service– Due To NATO Testing
JTLS-2010-10470JOI, TOI As Services
July 2015 86Copyright 2015, ROLANDS & ASSOCIATES Corporation
• One Of The New Services– JTLS Used For Test Bed– No Matter What Happens To Service
• The ATOG As Delivered Will Remain In JTLS
• Separate Briefing
JTLS-2007-2012WHIP ATO-Generator
July 2015 87Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Translator Becomes Service– Same Concept As Generator– Requirement To Work With
• Theater Battle Management Core System (TBMCS)– US
• Integrated Command Control System (ICC)– NATO
• Northern European Command – Command Control Information System (NEC-CCIS)
– Norway
JLVC-2020WHIP ATO-Translator Service
July 2015 88Copyright 2015, ROLANDS & ASSOCIATES Corporation
JLVC-2020WHIP ATO-Translator Service
July 2015 89
TBMCSICCNEC-CCIS
ATO/ACO
ATO-ParserParsed
XMLFile
ATOT Component
WHIPWeb Access
XMLLinking
File
ATO-T
XMLMission
File
SpreadsheetComponent
Apache
Copyright 2015, ROLANDS & ASSOCIATES Corporation
Synapse
• Request– JTLS symbology must be upgraded to comply
with Military Standard 2525B and match other simulation models, as well as current C2 systems.
– JTLS is non-standard in virtually all air symbols, which are not meaningful to a training audience that uses the Common Operational Picture.
JTLS-0405JTLS Air Symbology
July 2015 90Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Developing New 2525 Symbol Set– Each Symbol Will Have Three Looks
• Friendly, Neutral, Enemy• Sequentially Numbered
– Database Hold Friendly Number
• Symbol Is Perceived Attribute– If Friendly - Database Value + 0– If Neutral – Database Value + 1– If Enemy – Database Value + 2
• Non 2525 Support Capability– Color-Coding and Percent Capable Thermometer
JTLS-0405JTLS Air Symbology
July 2015 91Copyright 2015, ROLANDS & ASSOCIATES Corporation
• Naval Unit Has A Home Port– Marks Unit As A Naval Port
• New Naval Task– Enter Port Vice Move To Area Of Port– When In Port
• Automatically Attempt Entry Into Shelter• Follow Within Unit Radius Of Port
– When In Unit Radius Of Port• Follow SSM, Aircraft, AD Firing Restrictions
JTLS-2006-1648Model Naval Improved Port Capacity
July 2015 92Copyright 2015, ROLANDS & ASSOCIATES Corporation
Questions
July 2015 93Copyright 2015, ROLANDS &
ASSOCIATES Corporation