  • 8/3/2019 Jude Cooper IEMA DWH Pres_ppt

    1/21

    Prepared byGenesis Oil & Gas Consultants Ltd.,

    6, Albyn Place, Aberdeen, AB10 1YH

    tel. 01224 615100 fax. 01224 615111

    www.genesisoilandgas.com

    Prepared for

    Institute of Environmental Management

    & Assessment

    Deepwater Horizon a high-levelsummary of the BP internal

    investigation report findings

    http://www.genesisoilandgas.com/http://www.genesisoilandgas.com/
  • 8/3/2019 Jude Cooper IEMA DWH Pres_ppt

    2/21

    Prepared by Genesis Oil and Gas Consultants

    Contents

    2

    OffshoreOffshore installationsinstallationsWellWell profile,profile, drilldrill stringstring andand circulationcirculation systemsystem

    CasingCasing andand cementingcementing

    WellWell controlcontrol

    BlowBlow outout preventerpreventer

    SummarySummary ofof BPsBPs internalinternal reportreport intointo thethe blowoutblowout onon

    DeepwaterDeepwater HorizonHorizon

  • 8/3/2019 Jude Cooper IEMA DWH Pres_ppt

    3/21

    Prepared by Genesis Oil and Gas Consultants

    Offshore installations

    3

    source unknown

  • 8/3/2019 Jude Cooper IEMA DWH Pres_ppt

    4/21

    Prepared by Genesis Oil and Gas Consultants

    Well profile

    4

    7 Liner hanger

    7 Liner shoe

    source unknown

  • 8/3/2019 Jude Cooper IEMA DWH Pres_ppt

    5/21

    Prepared by Genesis Oil and Gas Consultants

    Drill string and drill bit

    5

    TheThe drilldrill stringstring comprisescomprises 3030 jointsjoints ofof hollowhollow pipe,pipe,screwedscrewed togethertogether toto makemake aa longlong drilldrill stringstring

    Drilling fluid (mud) is pumped down the drill string to the drill bit

    source unknown

  • 8/3/2019 Jude Cooper IEMA DWH Pres_ppt

    6/21

    Prepared by Genesis Oil and Gas Consultants

    Circulation system

    6

    source unknown

  • 8/3/2019 Jude Cooper IEMA DWH Pres_ppt

    7/21

    Prepared by Genesis Oil and Gas Consultants

    Casing

    Casing is the steel pipe that is run into the drilled holeCasing is the steel pipe that is run into the drilled holeand cemented into place. The purpose of casing is:and cemented into place. The purpose of casing is:

    To seal off permeable formations and prevent fluids enteringthe wellbore

    Provide physical support to the wellbore Prevent reactions between formation and wellbore fluids.

  • 8/3/2019 Jude Cooper IEMA DWH Pres_ppt

    8/21

    Prepared by Genesis Oil and Gas Consultants

    Cementing casing

    Cement jobCement job

    After running the casing string, chemical spacers are pumped to improvethe cement bond

    The bottom rubber plug is pushed into the casing, behind it cement ispumped

    Once all of the cement is pumped the solid top plug is dropped anddisplaced with a displacement fluid (usually mud)

    The bottom plug has a rupture disk in the middle which bursts open when aset amount of pressure is applied from above

    Once the two plugs have bumped the cementers know the cement job iscomplete.

  • 8/3/2019 Jude Cooper IEMA DWH Pres_ppt

    9/21

    Prepared by Genesis Oil and Gas Consultants

    Cement job

    source unknown

  • 8/3/2019 Jude Cooper IEMA DWH Pres_ppt

    10/21

    Prepared by Genesis Oil and Gas Consultants

    Well control

    10

    BalancingBalancing thethe pressurepressure exertedexerted byby thethe formationformation onon thethewellwell borebore

    Correct mud weight Physical barriers Casing Cement

    Monitoring Pit levels Pressure

    Blow-Out Preventers

    adapted fromhttp://images.pennwellnet.com/ogj/images/ogj2/9644jsh03.gif

    http://images.pennwellnet.com/ogj/images/ogj2/9644jsh03.gifhttp://images.pennwellnet.com/ogj/images/ogj2/9644jsh03.gif
  • 8/3/2019 Jude Cooper IEMA DWH Pres_ppt

    11/21

    Prepared by Genesis Oil and Gas Consultants

    Subsea BOP

    11

    Blind Shear Ram

    BOPStack

    fromhttp://www.nytimes.com/interactive/2010/06/21/us/20100621-bop.html?scp=1&sq=BOP%20animation&st=cse

    http://www.nytimes.com/interactive/2010/06/21/us/20100621-bop.html?scp=1&sq=BOP%20animation&st=csehttp://www.nytimes.com/interactive/2010/06/21/us/20100621-bop.html?scp=1&sq=BOP%20animation&st=cse
  • 8/3/2019 Jude Cooper IEMA DWH Pres_ppt

    12/21

    Prepared by Genesis Oil and Gas Consultants

    Deepwater Horizonincident

    12

    TheThe followingfollowing informationinformation (including(including graphics)graphics) isis takentaken

    fromfrom BPsBPs internalinternal investigationinvestigation report,report, publishedpublished 0808

    SeptemberSeptember 20102010..

    TheThe reportreport isis availableavailable onon BPsBPs websitewebsite ((wwwwww..bpbp..comcom))

  • 8/3/2019 Jude Cooper IEMA DWH Pres_ppt

    13/21

    Prepared by Genesis Oil and Gas Consultants

    Deepwater Horizonincident

    13

    StatusStatus ofof wellwell priorprior toto blowoutblowout

    The well had been drilled to total depth The well was cased and fully cemented Integrity tests had been carried out on

    the casing and cement

    Temporary abandonment of the wellwas almost complete

    Deepwater Horizon was connected tothe well via the marine riser and BOP

  • 8/3/2019 Jude Cooper IEMA DWH Pres_ppt

    14/21

    Prepared by Genesis Oil and Gas Consultants

    Deepwater Horizonincident

    14

    AA complexcomplex andand interlinkedinterlinked seriesseries ofof mechanicalmechanical failures,failures,

    humanhuman judgements, judgements, engineeringengineering design,design, operationaloperational

    implementationimplementation andand teamteam interactionsinteractions camecame togethertogether toto allowallow

    thethe initiationinitiation andand escalationescalation ofof thethe DeepwaterDeepwater HorizonHorizon

    accidentaccident.. MultipleMultiple companies,companies, workwork teamsteams andand circumstancescircumstances

    werewere involvedinvolved overover timetime..

  • 8/3/2019 Jude Cooper IEMA DWH Pres_ppt

    15/21

    Prepared by Genesis Oil and Gas Consultants

    Deepwater Horizonincident

    15

    KeyKey findingsfindings ofof thethe BPBP internalinternal reportreport

  • 8/3/2019 Jude Cooper IEMA DWH Pres_ppt

    16/21

    Prepared by Genesis Oil and Gas Consultants

    Well integrity

    16

    KeyKey findingfinding ##11

    The annulus cementbarrier did not isolate

    the hydrocarbons

    KeyKey findingfinding ##22 The shoe trackbarriers did not isolate

    the hydrocarbons

  • 8/3/2019 Jude Cooper IEMA DWH Pres_ppt

    17/21

    Prepared by Genesis Oil and Gas Consultants

    Hydrocarbons enter the well undetected

    17

    KeyKey findingfinding ##33

    The negative pressure test was accepted although well integrityhad not been established

  • 8/3/2019 Jude Cooper IEMA DWH Pres_ppt

    18/21

    Prepared by Genesis Oil and Gas Consultants

    Hydrocarbons enter the well undetected

    18

    KeyKey findingfinding ##44

    The influx was not recognised until hydrocarbons were in the riser Simultaneous activities may have impeded monitoringMud transfer to supply boat Cleaning trip tank

    KeyKey findingfinding ##55

    Well control response actions failed to regain control of the well

  • 8/3/2019 Jude Cooper IEMA DWH Pres_ppt

    19/21

    Prepared by Genesis Oil and Gas Consultants

    Hydrocarbons spread and ignite

    19

    KeyKey findingfinding ##66 && ##77

    Diversion to the mud gas separator resulted in gas venting onto the rig The fire and

    gas system

    did not

    prevent

    hydrocarbon

    ignition

  • 8/3/2019 Jude Cooper IEMA DWH Pres_ppt

    20/21

    Prepared by Genesis Oil and Gas Consultants

    BOP did not seal the well

    20

    KeyKey findingfinding ##88

    The BOP emergency mode didnot seal the well

    Emergency disconnectsequence was not

    successful

    Multiplex (MUX) cablespossibly damaged during

    initial explosion

    Blue pod insufficientcharge on the batteries Yellow pod failed solenoidvalve

  • 8/3/2019 Jude Cooper IEMA DWH Pres_ppt

    21/21

    Prepared by Genesis Oil and Gas Consultants21

    The investigation teams recommendations fall into eightThe investigation teams recommendations fall into eightcategoriescategories

    Procedures and Engineering Technical Practices Capability and Competency Audit and Verification Process Safety Performance Management Cementing Services AssuranceWell Control Practices Rig Process Safety BOP Design and Assurance.

    BP recommendations