Deepwater Horizon a high-levelsummary of the BP internal
investigation report findings
http://www.genesisoilandgas.com/http://www.genesisoilandgas.com/ -
8/3/2019 Jude Cooper IEMA DWH Pres_ppt
2/21
Prepared by Genesis Oil and Gas Consultants
Contents
2
OffshoreOffshore installationsinstallationsWellWell profile,profile, drilldrill stringstring andand circulationcirculation systemsystem
CasingCasing andand cementingcementing
WellWell controlcontrol
BlowBlow outout preventerpreventer
SummarySummary ofof BPsBPs internalinternal reportreport intointo thethe blowoutblowout onon
DeepwaterDeepwater HorizonHorizon
-
8/3/2019 Jude Cooper IEMA DWH Pres_ppt
3/21
Prepared by Genesis Oil and Gas Consultants
Offshore installations
3
source unknown
-
8/3/2019 Jude Cooper IEMA DWH Pres_ppt
4/21
Prepared by Genesis Oil and Gas Consultants
Well profile
4
7 Liner hanger
7 Liner shoe
source unknown
-
8/3/2019 Jude Cooper IEMA DWH Pres_ppt
5/21
Prepared by Genesis Oil and Gas Consultants
Drill string and drill bit
5
TheThe drilldrill stringstring comprisescomprises 3030 jointsjoints ofof hollowhollow pipe,pipe,screwedscrewed togethertogether toto makemake aa longlong drilldrill stringstring
Drilling fluid (mud) is pumped down the drill string to the drill bit
source unknown
-
8/3/2019 Jude Cooper IEMA DWH Pres_ppt
6/21
Prepared by Genesis Oil and Gas Consultants
Circulation system
6
source unknown
-
8/3/2019 Jude Cooper IEMA DWH Pres_ppt
7/21
Prepared by Genesis Oil and Gas Consultants
Casing
Casing is the steel pipe that is run into the drilled holeCasing is the steel pipe that is run into the drilled holeand cemented into place. The purpose of casing is:and cemented into place. The purpose of casing is:
To seal off permeable formations and prevent fluids enteringthe wellbore
Provide physical support to the wellbore Prevent reactions between formation and wellbore fluids.
-
8/3/2019 Jude Cooper IEMA DWH Pres_ppt
8/21
Prepared by Genesis Oil and Gas Consultants
Cementing casing
Cement jobCement job
After running the casing string, chemical spacers are pumped to improvethe cement bond
The bottom rubber plug is pushed into the casing, behind it cement ispumped
Once all of the cement is pumped the solid top plug is dropped anddisplaced with a displacement fluid (usually mud)
The bottom plug has a rupture disk in the middle which bursts open when aset amount of pressure is applied from above
Once the two plugs have bumped the cementers know the cement job iscomplete.
-
8/3/2019 Jude Cooper IEMA DWH Pres_ppt
9/21
Prepared by Genesis Oil and Gas Consultants
Cement job
source unknown
-
8/3/2019 Jude Cooper IEMA DWH Pres_ppt
10/21
Prepared by Genesis Oil and Gas Consultants
Well control
10
BalancingBalancing thethe pressurepressure exertedexerted byby thethe formationformation onon thethewellwell borebore
Correct mud weight Physical barriers Casing Cement
Monitoring Pit levels Pressure
Blow-Out Preventers
adapted fromhttp://images.pennwellnet.com/ogj/images/ogj2/9644jsh03.gif
http://images.pennwellnet.com/ogj/images/ogj2/9644jsh03.gifhttp://images.pennwellnet.com/ogj/images/ogj2/9644jsh03.gif -
8/3/2019 Jude Cooper IEMA DWH Pres_ppt
11/21
Prepared by Genesis Oil and Gas Consultants
Subsea BOP
11
Blind Shear Ram
BOPStack
fromhttp://www.nytimes.com/interactive/2010/06/21/us/20100621-bop.html?scp=1&sq=BOP%20animation&st=cse
http://www.nytimes.com/interactive/2010/06/21/us/20100621-bop.html?scp=1&sq=BOP%20animation&st=csehttp://www.nytimes.com/interactive/2010/06/21/us/20100621-bop.html?scp=1&sq=BOP%20animation&st=cse -
8/3/2019 Jude Cooper IEMA DWH Pres_ppt
12/21
Prepared by Genesis Oil and Gas Consultants
Deepwater Horizonincident
12
TheThe followingfollowing informationinformation (including(including graphics)graphics) isis takentaken
fromfrom BPsBPs internalinternal investigationinvestigation report,report, publishedpublished 0808
SeptemberSeptember 20102010..
TheThe reportreport isis availableavailable onon BPsBPs websitewebsite ((wwwwww..bpbp..comcom))
-
8/3/2019 Jude Cooper IEMA DWH Pres_ppt
13/21
Prepared by Genesis Oil and Gas Consultants
Deepwater Horizonincident
13
StatusStatus ofof wellwell priorprior toto blowoutblowout
The well had been drilled to total depth The well was cased and fully cemented Integrity tests had been carried out on
the casing and cement
Temporary abandonment of the wellwas almost complete
Deepwater Horizon was connected tothe well via the marine riser and BOP
-
8/3/2019 Jude Cooper IEMA DWH Pres_ppt
14/21
Prepared by Genesis Oil and Gas Consultants
Deepwater Horizonincident
14
AA complexcomplex andand interlinkedinterlinked seriesseries ofof mechanicalmechanical failures,failures,
humanhuman judgements, judgements, engineeringengineering design,design, operationaloperational
implementationimplementation andand teamteam interactionsinteractions camecame togethertogether toto allowallow
thethe initiationinitiation andand escalationescalation ofof thethe DeepwaterDeepwater HorizonHorizon
accidentaccident.. MultipleMultiple companies,companies, workwork teamsteams andand circumstancescircumstances
werewere involvedinvolved overover timetime..
-
8/3/2019 Jude Cooper IEMA DWH Pres_ppt
15/21
Prepared by Genesis Oil and Gas Consultants
Deepwater Horizonincident
15
KeyKey findingsfindings ofof thethe BPBP internalinternal reportreport
-
8/3/2019 Jude Cooper IEMA DWH Pres_ppt
16/21
Prepared by Genesis Oil and Gas Consultants
Well integrity
16
KeyKey findingfinding ##11
The annulus cementbarrier did not isolate
the hydrocarbons
KeyKey findingfinding ##22 The shoe trackbarriers did not isolate
the hydrocarbons
-
8/3/2019 Jude Cooper IEMA DWH Pres_ppt
17/21
Prepared by Genesis Oil and Gas Consultants
Hydrocarbons enter the well undetected
17
KeyKey findingfinding ##33
The negative pressure test was accepted although well integrityhad not been established
-
8/3/2019 Jude Cooper IEMA DWH Pres_ppt
18/21
Prepared by Genesis Oil and Gas Consultants
Hydrocarbons enter the well undetected
18
KeyKey findingfinding ##44
The influx was not recognised until hydrocarbons were in the riser Simultaneous activities may have impeded monitoringMud transfer to supply boat Cleaning trip tank
KeyKey findingfinding ##55
Well control response actions failed to regain control of the well
-
8/3/2019 Jude Cooper IEMA DWH Pres_ppt
19/21
Prepared by Genesis Oil and Gas Consultants
Hydrocarbons spread and ignite
19
KeyKey findingfinding ##66 && ##77
Diversion to the mud gas separator resulted in gas venting onto the rig The fire and
gas system
did not
prevent
hydrocarbon
ignition
-
8/3/2019 Jude Cooper IEMA DWH Pres_ppt
20/21
Prepared by Genesis Oil and Gas Consultants
BOP did not seal the well
20
KeyKey findingfinding ##88
The BOP emergency mode didnot seal the well
Emergency disconnectsequence was not
successful
Multiplex (MUX) cablespossibly damaged during
initial explosion
Blue pod insufficientcharge on the batteries Yellow pod failed solenoidvalve
-
8/3/2019 Jude Cooper IEMA DWH Pres_ppt
21/21
Prepared by Genesis Oil and Gas Consultants21
The investigation teams recommendations fall into eightThe investigation teams recommendations fall into eightcategoriescategories
Procedures and Engineering Technical Practices Capability and Competency Audit and Verification Process Safety Performance Management Cementing Services AssuranceWell Control Practices Rig Process Safety BOP Design and Assurance.
BP recommendations