july 6, 2004apan cairns meetings ciren backbone july 6, 2004 kazunori konishi

12
July 6, 2004 APAN Cairns Meetings CIREN Backbone July 6, 2004 Kazunori Konishi

Upload: darrell-gregory

Post on 18-Jan-2018

215 views

Category:

Documents


0 download

DESCRIPTION

July 6, 2004APAN Cairns Meetings Requirements & Commitment 1. Support of R&E Community: Major Networks have joined this proposal. 2. Network Topology: US – Tokyo - HK Busan SG – (IN) 3. Network R&D: NOC Collaborations, HOPI(Hybrid Optical and Packet Infrastructure), Measurement Infrastructure, E2E Performance, Security Center, etc. 4. Support of NSF’s CyberInfrastructure: Global deployment of HENP, VLBI, NCMIR, TeraGrid, etc. 5. Extension to other region: Connection to India will be studied.

TRANSCRIPT

Page 1: July 6, 2004APAN Cairns Meetings CIREN Backbone July 6, 2004 Kazunori Konishi

July 6, 2004 APAN Cairns Meetings

CIREN Backbone

July 6, 2004Kazunori Konishi

Page 2: July 6, 2004APAN Cairns Meetings CIREN Backbone July 6, 2004 Kazunori Konishi

July 6, 2004 APAN Cairns Meetings

What is CIREN?CIREN:   Consortium of International Research an

d Education Networks

Most of the Research & Education Networks have joined this proposal, for expanding the global collaborations.

Principal Investigator Michael McRobbie (Indiana Univ.)Co-PI Doug Van Houweling (Internet2) Dai Davies (DANTE) Shigeki Goto (APAN)

Nelson Simoes da Silva (CLARA)

Page 3: July 6, 2004APAN Cairns Meetings CIREN Backbone July 6, 2004 Kazunori Konishi

July 6, 2004 APAN Cairns Meetings

Requirements & Commitment1. Support of R&E Community: Major Networks have jo

ined this proposal.2. Network Topology: US – Tokyo - HK Busan SG – (IN)3. Network R&D: NOC Collaborations, HOPI(Hybrid Op

tical and Packet Infrastructure), Measurement Infrastructure, E2E Performance, Security Center, etc.

4. Support of NSF’s CyberInfrastructure: Global deployment of HENP, VLBI, NCMIR, TeraGrid, etc.

5. Extension to other region: Connection to India will be studied.

Page 4: July 6, 2004APAN Cairns Meetings CIREN Backbone July 6, 2004 Kazunori Konishi

July 6, 2004 APAN Cairns Meetings

New TransPAC links

• NICT will get: - 10Gbps single or low-priority SONET ring circuit ( SONET STS12c X 16 ) from Carrier-LA to StarLight. - a single International circuit with the same SONET framing from Tokyo XP to Carrier-LA.• IU will surely secure the grant extension of 9 months for HPIIS, IU will get

- 10Gbps high-priority SONET ring circuit ( SONET STS192c ) from Carrier-LA to Abilene-LA.- the other single International circuit of the same SONET framing from Tokyo XP to Carrier-LA.

• IU will synchronize the purchase of the circuits with NICT:- the same carrier should be selected- the new contract will start at 2004.8.1.- the terminating date of IU is 2005.4.30.

Tyco Shinagawa Tyco LA?

Tokyo XP

TransLIGHT

Carrier-LA

Abilene

CHIN

LOSA

Lambda

Router

Carrier ADM

SONET STS12c x 16

SONET STS12c x 16Unprotected

10GigE

Pro8812+OC192 POS

Cisco ONS15454+ML x 4+OC192IR x 1+XC-10G x 2

Cisco ONS

SONET STS192c

SONET STS192cProtected

Cisco ONS15454+ML x 4+OC192IR x 1+XC-10G x 2

SL Switch

Page 5: July 6, 2004APAN Cairns Meetings CIREN Backbone July 6, 2004 Kazunori Konishi

July 6, 2004 APAN Cairns Meetings

CJK Gigabit Network

SiSi

SiSi

APAN GbE

TransPAC2.5Gbps x 2

10Gλx 2 in 2004

SL

CERNETCSTNET

2.5Gbps SONET (2.5Gbps x 2 in future)GbE/SONET Converter GbE/SONET Convert

er

WIDE DIX-6

SiSi

apan

SiSi

SiSi

WIDE DIX-4 SINET

JGN

SiSi

Genkai GbE

KR

Dragon Tap & CNGI XP

Conv.

JAPANChina

2.5Gbps SONET

LA

IPv6 GEIPv4 GE

SiSi

SiSi

SiSiSiSi

E over MPLS

SiSi

SiSi

6TNet

BUPT

Page 6: July 6, 2004APAN Cairns Meetings CIREN Backbone July 6, 2004 Kazunori Konishi

July 6, 2004 APAN Cairns Meetings

Links between JP and South East Asia

Two links are envisaged: 1. JP-SG link: 155Mbps in 2005 is proposed to NSF by CIREN 2. JP- TH link: 2Mbps -> 45Mbps in 2004 is being studied by NII.

Page 7: July 6, 2004APAN Cairns Meetings CIREN Backbone July 6, 2004 Kazunori Konishi

July 6, 2004 APAN Cairns Meetings

APAN Network Topology

Page 8: July 6, 2004APAN Cairns Meetings CIREN Backbone July 6, 2004 Kazunori Konishi

July 6, 2004 APAN Cairns Meetings

HOPI

GLIF agrees Hybrid approach is promising!

Page 9: July 6, 2004APAN Cairns Meetings CIREN Backbone July 6, 2004 Kazunori Konishi

July 6, 2004 APAN Cairns Meetings

Observatory

• Backbone Network Measurement will be jointly executed by Researchers as well as NOC:– Throughput, Latency, Routing, Netflow, Usag

e, Router, Syslog• Data collected by NOC will be provided to

the authorized network researchers or students, for encouraging the network research activities: Advanced NOC service

Page 10: July 6, 2004APAN Cairns Meetings CIREN Backbone July 6, 2004 Kazunori Konishi

July 6, 2004 APAN Cairns Meetings

End-to-end Performance• E2E performance can be executed by the joint eff

orts of network researchers and e-Science/Application researchers, ex. eVLBI.

• This project is critical for the development of APAN. Tokyo-LA link Usage is shown below:

Page 11: July 6, 2004APAN Cairns Meetings CIREN Backbone July 6, 2004 Kazunori Konishi

July 6, 2004 APAN Cairns Meetings

Security

• Security researchers will work closely with NOC for stabilizing the networks.

• NOC will provide Netflow data to the authorized researchers for encouraging the security researches over the real networks.

Page 12: July 6, 2004APAN Cairns Meetings CIREN Backbone July 6, 2004 Kazunori Konishi

July 6, 2004 APAN Cairns Meetings

Thank you!