june 2018 mernda train stabling yard...mernda train stabling yard during construction (top) and...

2
levelcrossings.vic.gov.au/merndarail Authorised and published by the Victorian Government, 1 Treasury Place, Melbourne JUNE 2018 MERNDA TRAIN STABLING YARD Catering for more trains The Victorian Government is building three new state-of-the-art stations, and eight kilometres of new rail line between South Morang Station, and the future Mernda Town Centre. The new rail line will help connect Melbourne’s growing north to work, study and entertainment. The extension of the South Morang line to Mernda, and the addition of three new stations means a facility to park up to eight trains is required at the end of the rail line. The Mernda train stabling yard is located within the rail corridor, north of Bridge Inn Road, and will allow more services to run on both the Mernda and Hurstbridge lines during peak service. Without train storage facilities, trains need to travel long distances without passengers, reducing the number of timetabled train services that can operate across the network. Mernda train stabling yard during construction (top) and train buffer stop (above).

Upload: others

Post on 04-Mar-2021

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: JUNE 2018 MERNDA TRAIN STABLING YARD...Mernda train stabling yard during construction (top) and train buffer stop (above). Follow us on social media @levelcrossings Translation service

levelcrossings.vic.gov.au/merndarailAuthorised and published by the Victorian Government, 1 Treasury Place, Melbourne

JUNE 2018

MERNDA TRAIN STABLING YARD

Catering for more trains The Victorian Government is building three new state-of-the-art stations, and eight kilometres of new rail line between South Morang Station, and the future Mernda Town Centre. The new rail line will help connect Melbourne’s growing north to work, study and entertainment.

The extension of the South Morang line to Mernda, and the addition of three new stations means a facility to park up to eight trains is required at the end of the rail line.

The Mernda train stabling yard is located within the rail corridor, north of Bridge Inn Road, and will allow more services to run on both the Mernda and Hurstbridge lines during peak service.

Without train storage facilities, trains need to travel long distances without passengers, reducing the number of timetabled train services that can operate across the network.

Mernda train stabling yard during construction (top) and train buffer stop (above).

Page 2: JUNE 2018 MERNDA TRAIN STABLING YARD...Mernda train stabling yard during construction (top) and train buffer stop (above). Follow us on social media @levelcrossings Translation service

Follow us on social media @levelcrossings

Translation service – For languages other than English, please call 9280 0780.

Please contact us if you would like this information in an accessible format. M

ER10

65

CONTACT [email protected] 105 105Level Crossing Removal Authority GPO Box 4509, Melbourne VIC 3001

Scho

tter

s R

d

Gael Ct

Brendan St

Johnsons Rd

Hayes Rd

Heals Rd

Hazel Glen Dr

Masons Rd

Oval Park

Mernda Off-Leash Dog Park

Mernda Recreation

Reserve

Mernda Village Dr

Plen

ty R

d

Ple

nty

Rd

Plenty

Rd

Sta

tion

Rd

Sch

otte

rs R

d

MerndaPrimary School

Mernda Uniting Church

Doreen

Bridge Inn Rd

Location of stabling yard

What happens in the train stabling yard? Train stabling yards are where trains are parked whilst not in operation. Typically, trains return to the stabling yard at the end of service and are stored until they are required again.

The train stabling yard in Mernda features:

• A security fence around the perimeter

• Four rows of tracks, with two trains parked on each row

• Connection to the main train line

• Overhead power supply for trains

• Signalling and communication systems

• CCTV and lighting

• A substation to power trains

• Operations and amenities facilities for train staff and drivers

• Designated areas for staff car parking

• Access roads and walkways.

What might I notice?• Up to eight trains stored in

the facility at any given time

• Statutory safety testing of train horns before scheduled services commence and sounded when exiting the yard

• Internal light cleaning occurring at the end of daily scheduled services. Graffiti removal or external train wash activities will occur at purpose-built train maintenance and wash facilities elsewhere on the network

• Train drivers and staff vehicles moving about

• Air conditioning units running on hot nights

• Mounted lights within the stabling yard, set back and directed away from residential properties to minimise light spill.

Location of stabling yard