k97b >9

18

Upload: others

Post on 06-Aug-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: K97B >9
Page 2: K97B >9

Item Title

CBACS (Central Building Automation Control System) DFD – System Architecture Block Diagrams

Item Code

1G00PS250C702 History of Revisions:

4 29.09.14 C. Agliottone R. Palma G. Rizzi I. Fulgieri DFD stage – Engineer’s name having authorization role have been changed. Then, relevant cover-sheet’s field has been updated.

3 10.07.14 R. Palma P. Rapacciuolo G. Rizzi I. Fulgieri DFD stage:

• Updated PBS codes removing zeroes in room number section.

• Updated PBS codes of Power Supply Cabinet and Power Distribution Box.

• Updated PBS code of Depot-CBACS components at OCC Central Control Room, OCC Equipment Room and Depot Control Room. Acronym of geographic area updated from D14 to B14.

• Input documents code has been changed; in particular, Bill of Materials has now code 1G00PS250K111, whilst Components’ Datasheets has now code 1G00PS250G211.

• Equipment out of subsystem’s scope have been clearly identified by ‘*’ symbol.

2 11.06.14 R. Palma P. Rapacciuolo G. Rizzi I. Fulgieri DFD stage:

• Rooms’ codes have been changed to comply with System’s architectural drawing documents. Then, location codes in the relevant PBS codes have been updated.

• Engineer’s name having authorization role have been changed. Then, relevant cover-sheet’s field has been updated.

• “From-To” tables have been added.

1 31.12.13 R. Palma P. Rapacciuolo G. Rizzi I. Fulgieri DFD stage – First issue.

ΑΝΑΘ.

REV.

HM/NIA

DATE

ΣΥΝΤ.

INIT.

ΕΛΕΓΧ.

CHK.

ΕΓΚΡΙΘΗΚΕ

APPROVED

Πελάτης ΕΛΕΓΧ.

Customer CHK.

ΠΕΡΙΓΡΑΦΗ

DESCRIPTION Communications and Open Issues:

1

ΑΝΑΘ.

REV.

ΚΩ∆ΙΚΟΣ

CODE

ΑΠΟΣΤ.

SENDER

ΠΑΡΑΛ.

RECEIVER

ΠΕΡΙΓΡΑΦΗ

DESCRIPTION

ΑΠΌΚΡΙΣΗ

RESPONSE

ΚΑΤΆΣ.

STATE

Page 3: K97B >9

METPO ΘEΣΣAΛΟΝΙΚHΣ-THESSALONIKI METRO EPΓO: CON-06 / 004 - PROJECT: CON-06 / 004

A 23.10.14 1G00PS250C702A_EN_00.DOC CBACS (Σύστηµα Κεντρικό Ελέγχου Αυτοµατισµού Κτιρίων)

<Greek Title> CBACS (Central Building Automation Control System)

DFD – System Architecture Block Diagrams

1G00PS250C702

Αναθ.-Rev.

Ηµ/νια-Date

Αρχείο-Filename Σελίδα-Page 3 / 14

ΤΟΜΕΑΣ A

Ελληνική Γλώσσα

Page 4: K97B >9

METPO ΘEΣΣAΛΟΝΙΚHΣ-THESSALONIKI METRO EPΓO: CON-06 / 004 - PROJECT: CON-06 / 004

A 23.10.14 1G00PS250C702A_EN_00.DOC CBACS (Σύστηµα Κεντρικό Ελέγχου Αυτοµατισµού Κτιρίων)

<Greek Title> CBACS (Central Building Automation Control System)

DFD – System Architecture Block Diagrams

1G00PS250C702

Αναθ.-Rev.

Ηµ/νια-Date

Αρχείο-Filename Σελίδα-Page 4 / 14

SECTION B

English Language

Page 5: K97B >9

METPO ΘEΣΣAΛΟΝΙΚHΣ-THESSALONIKI METRO EPΓO: CON-06 / 004 - PROJECT: CON-06 / 004

A 23.10.14 1G00PS250C702A_EN_00.DOC CBACS (Σύστηµα Κεντρικό Ελέγχου Αυτοµατισµού Κτιρίων)

<Greek Title> CBACS (Central Building Automation Control System)

DFD – System Architecture Block Diagrams

1G00PS250C702

Αναθ.-Rev.

Ηµ/νια-Date

Αρχείο-Filename Σελίδα-Page 5 / 14

Table of Contents

1 Introduction ...................................... .................................................................................................... 7

1.1 Context Description ............................................................................................................................ 7

1.2 Scope of the Document ...................................................................................................................... 7

1.3 Reference Documents ........................................................................................................................ 8

1.3.1 Input Documents ........................................................................................................................................ 8

1.3.2 Applicable Documents ............................................................................................................................... 8

1.3.3 Previous Stage Document ......................................................................................................................... 9

1.3.4 Literature Documents ................................................................................................................................. 9

1.3.5 Customer’s Design Review Documents ..................................................................................................... 9

1.3.6 Verification Documents .............................................................................................................................. 9

1.4 Reference Standards and Regulations .............................................................................................. 9

1.5 Glossary of Terms ............................................................................................................................ 10

1.6 Glossary of Acronyms ...................................................................................................................... 10

2 History of Revisions............................... ............................................................................................ 11

2.1 Revision A ......................................................................................................................................... 11

2.1.1 List of Changes ........................................................................................................................................ 11

2.1.2 List of Open Issues .................................................................................................................................. 11

2.1.3 Verification Report .................................................................................................................................... 11

3 CBACS’ Architecture Block Diagrams ................ ............................................................................. 12

3.1 General Description .......................................................................................................................... 12

3.2 Architecture Drawings ...................................................................................................................... 12

3.3 Cables Specifications ....................................................................................................................... 12

4 Depot-CBACS’ Architecture Block Diagrams .......... ....................................................................... 13

4.1 General Description .......................................................................................................................... 13

4.2 Architecture Drawings ...................................................................................................................... 13

4.3 Cables Specifications ....................................................................................................................... 13

Page 6: K97B >9

METPO ΘEΣΣAΛΟΝΙΚHΣ-THESSALONIKI METRO EPΓO: CON-06 / 004 - PROJECT: CON-06 / 004

A 23.10.14 1G00PS250C702A_EN_00.DOC CBACS (Σύστηµα Κεντρικό Ελέγχου Αυτοµατισµού Κτιρίων)

<Greek Title> CBACS (Central Building Automation Control System)

DFD – System Architecture Block Diagrams

1G00PS250C702

Αναθ.-Rev.

Ηµ/νια-Date

Αρχείο-Filename Σελίδα-Page 6 / 14

Index of Figures

None.

Index of Tables

Table 1-1 – Input Documents ........................................................................................................................ 8

Table 1-2 – Applicable Documents ............................................................................................................... 8

Table 1-3 – Previous Stage Document ......................................................................................................... 9

Table 1-4 – Literature Documents ................................................................................................................. 9

Table 1-5 – Customer’s Design Review ........................................................................................................ 9

Table 1-6 – Verification Documents .............................................................................................................. 9

Table 1-7 – Reference Standards and Regulations ...................................................................................... 9

Table 1-8 – Glossary of Terms .................................................................................................................... 10

Table 1-9 – Glossary of Acronyms .............................................................................................................. 10

Table 2-1 – Revision A – List of Changes ................................................................................................... 11

Table 2-2 – Revision A – List of Open Issues ............................................................................................. 11

Table 2-3 – Revision A – Verification Report .............................................................................................. 11

Page 7: K97B >9

METPO ΘEΣΣAΛΟΝΙΚHΣ-THESSALONIKI METRO EPΓO: CON-06 / 004 - PROJECT: CON-06 / 004

A 23.10.14 1G00PS250C702A_EN_00.DOC CBACS (Σύστηµα Κεντρικό Ελέγχου Αυτοµατισµού Κτιρίων)

<Greek Title> CBACS (Central Building Automation Control System)

DFD – System Architecture Block Diagrams

1G00PS250C702

Αναθ.-Rev.

Ηµ/νια-Date

Αρχείο-Filename Σελίδα-Page 7 / 14

1 Introduction

1.1 Context Description

This document is relevant to the Central Building Automation Control System (CBACS) and the Depot

Central Building Automation Control System (Depot-CBACS) of Thessaloniki Metro Project.

Both subsystems, CBACS and Depot-CBACS, are the HMI level of the Building Automation Control

System (BACS); thus, they don’t include BACS’ Field level.

The CBACS allows monitoring and, where applicable, command building automation equipment in the

stations, tunnels and along the railway.

The Depot-CBACS allows monitoring and, where applicable, command building automation equipment at

the depot.

The building automation equipment can be grouped in the three below listed types:

• Electro-Mechanical (escalators, lifts, UPS, pumps, fire detectors);

• Heating, Ventilation and Air Conditioning (HVAC);

• Ventilation (exhaust fans, over-track exhaust fans, supply air fans, blast shaft fans, jet fans).

1.2 Scope of the Document

The scope of this document is to describe for both subsystems, CBACS and Depot-CBACS, the relevant

architecture block diagrams, then:

• Location where the HW components are installed and operate;

• Power supply and network connecting cables’ quantity and type for each HW components.

Page 8: K97B >9

METPO ΘEΣΣAΛΟΝΙΚHΣ-THESSALONIKI METRO EPΓO: CON-06 / 004 - PROJECT: CON-06 / 004

A 23.10.14 1G00PS250C702A_EN_00.DOC CBACS (Σύστηµα Κεντρικό Ελέγχου Αυτοµατισµού Κτιρίων)

<Greek Title> CBACS (Central Building Automation Control System)

DFD – System Architecture Block Diagrams

1G00PS250C702

Αναθ.-Rev.

Ηµ/νια-Date

Αρχείο-Filename Σελίδα-Page 8 / 14

1.3 Reference Documents

1.3.1 Input Documents

Table 1-1 – Input Documents Item # Code Title Date Rev # ID.01 1G00PS250G105 CBACS.

DFD Technical Specification.

A

ID.02 1G00PS250K111 CBACS. DFD Bill of Materials.

A

ID.03 1G00PS258G105 CBACS Safe. DFD Technical Specification.

A

ID.04 1G00PS258K111 CBACS Safe. DFD Bill of Materials.

A

1.3.2 Applicable Documents

Table 1-2 – Applicable Documents Item # Code Title Date Rev # AD.01 1G00PS250G211 CBACS.

DFD Components Datasheets.

A

AD.02 1G00PS250C106 CBACS. DFD OCC Server Rack Electrical Schemes and Diagrams.

A

AD.03 1G00PS250O111 CBACS. DFD Racks and Equipment Description.

A

Page 9: K97B >9

METPO ΘEΣΣAΛΟΝΙΚHΣ-THESSALONIKI METRO EPΓO: CON-06 / 004 - PROJECT: CON-06 / 004

A 23.10.14 1G00PS250C702A_EN_00.DOC CBACS (Σύστηµα Κεντρικό Ελέγχου Αυτοµατισµού Κτιρίων)

<Greek Title> CBACS (Central Building Automation Control System)

DFD – System Architecture Block Diagrams

1G00PS250C702

Αναθ.-Rev.

Ηµ/νια-Date

Αρχείο-Filename Σελίδα-Page 9 / 14

1.3.3 Previous Stage Document

This paragraph defines if this document has been already issued in previous project’s stages GFD1 or

GFD2. If yes, the revision ‘A’ of this document takes as input the previous stage document, in the last

issued revision, and relevant open issues.

Table 1-3 – Previous Stage Document Item # Code Title Date Rev # PD 1G00PS250B702 CBACS.

GFD2 System Architecture Block Diagrams.

B

1.3.4 Literature Documents

Table 1-4 – Literature Documents Item # Code Title Date Rev # LD.01 None. None. None. None.

1.3.5 Customer’s Design Review Documents

First issue of this document, then no Customer’s design review document referred.

Table 1-5 – Customer’s Design Review Item # Code Title Date Rev # DD.01 None. None. None. None.

1.3.6 Verification Documents

Table 1-6 – Verification Documents Item # Code Title Date Rev # VD.01 1G00PS250G105 CBACS.

DFD Technical Specification. A

VD.02 1G00PS250K111 CBACS. DFD Bill of Materials.

A

VD.03 1G00PS258G105 CBACS Safe. DFD Technical Specification.

A

VD.04 1G00PS258K111 CBACS Safe. DFD Bill of Materials.

A

1.4 Reference Standards and Regulations

Table 1-7 – Reference Standards and Regulations Item # Code Title Date Rev # ST.01 None. None. None. None.

Page 10: K97B >9

METPO ΘEΣΣAΛΟΝΙΚHΣ-THESSALONIKI METRO EPΓO: CON-06 / 004 - PROJECT: CON-06 / 004

A 23.10.14 1G00PS250C702A_EN_00.DOC CBACS (Σύστηµα Κεντρικό Ελέγχου Αυτοµατισµού Κτιρίων)

<Greek Title> CBACS (Central Building Automation Control System)

DFD – System Architecture Block Diagrams

1G00PS250C702

Αναθ.-Rev.

Ηµ/νια-Date

Αρχείο-Filename Σελίδα-Page 10 / 14

1.5 Glossary of Terms

Table 1-8 – Glossary of Terms Term Description None. None.

1.6 Glossary of Acronyms

Table 1-9 – Glossary of Acronyms Acronym Description BACS Building Automation Control System. CBACS Central Building Automation Control System. CCR Central Control Room. DCR Depot Control Room. Depot -BACS Depot Building Automation Control System. Depot -CBACS Depot Central Building Automation Control System. DFD Detailed Final Design. DTS Digital Transmission System. DTSR Digital Transmission System Rack. EQP Equipment Room. GFD1 General Final Design 1. GFD2 General Final Design 2. HW or H/W Hardware. IT Information Technology Infrastructure. KVM Keyboard Video Mouse. LAN Local Area Network. LRU Lowest Replaceable Unit or Line Replaceable Unit. OCC Operation Control Centre. PBS Product Breakdown Structure. PLC Programmable Logic Controller. SMR Station Master Room. SW or S/W Software. TLC Telecommunication System

or Telecom Room.

UPS Un-interruptible Power Supply. WAN Wide Area Network.

Page 11: K97B >9

METPO ΘEΣΣAΛΟΝΙΚHΣ-THESSALONIKI METRO EPΓO: CON-06 / 004 - PROJECT: CON-06 / 004

A 23.10.14 1G00PS250C702A_EN_00.DOC CBACS (Σύστηµα Κεντρικό Ελέγχου Αυτοµατισµού Κτιρίων)

<Greek Title> CBACS (Central Building Automation Control System)

DFD – System Architecture Block Diagrams

1G00PS250C702

Αναθ.-Rev.

Ηµ/νια-Date

Αρχείο-Filename Σελίδα-Page 11 / 14

2 History of Revisions

2.1 Revision A

2.1.1 List of Changes

First issue of this document, then no list of changes is defined.

Table 2-1 – Revision A – List of Changes Item # Reference Remark / Question / Deficiency Response Changed

Sections RA.01 None. None. None. None.

2.1.2 List of Open Issues

First issue of this document, then no list of open issues is defined.

Table 2-2 – Revision A – List of Open Issues Item # Reference Remark / Question / Deficiency Response

OA.01 None. None. None.

2.1.3 Verification Report

Table 2-3 – Revision A – Verification Report Item # Reference Verification Description Result

VA.01 VD.01 • All HW groups and subgroups defined in

the VD.01 document are included in this document.

Success.

VA.02 VD.02 • All HW groups and subgroups defined in the VD.02 document are included in this document.

• PBS coding rules defined in the VD.02 document have been applied to this document.

Success.

VA.03 VD.03 • All HW groups and subgroups defined in the VD.03 document are included in this document.

Success.

VA.04 VD.04 • All HW groups and subgroups defined in the VD.04 document are included in this document.

• PBS coding rules defined in the VD.04 document have been applied to this document.

Success.

Page 12: K97B >9

METPO ΘEΣΣAΛΟΝΙΚHΣ-THESSALONIKI METRO EPΓO: CON-06 / 004 - PROJECT: CON-06 / 004

A 23.10.14 1G00PS250C702A_EN_00.DOC CBACS (Σύστηµα Κεντρικό Ελέγχου Αυτοµατισµού Κτιρίων)

<Greek Title> CBACS (Central Building Automation Control System)

DFD – System Architecture Block Diagrams

1G00PS250C702

Αναθ.-Rev.

Ηµ/νια-Date

Αρχείο-Filename Σελίδα-Page 12 / 14

3 CBACS’ Architecture Block Diagrams

3.1 General Description

CBACS’ HW components are installed and operate in the below listed locations:

• OCC rooms:

Equipment Room;

Central Control Room;

Maintenance Room;

• The thirteen Station Master Rooms.

3.2 Architecture Drawings

CBACS’ architecture drawings are included in the Annex #2.

They show, for each HW component:

• Position in the relevant location;

• Power supply and network connecting cables’ relationship.

3.3 Cables Specifications

Mechanical Specifications:

CONDxSECTION TYPE D.ext Rmin Weight [kg/km]

3G1.5 XLPE 10.7 130 163

3G2.5 XLPE 11.06 140 205

3G4 XLPE 12.5 150 260

3G6 XLPE 14.3 170 369

3G10 XLPE 17 200 529

EMI Specifications:

MN NS 230Vac / 400Vac / 110Vdc / 24Vdc cables.

The Annex #3 defines the FROM TO Table (OCC and SMRs).

Page 13: K97B >9

METPO ΘEΣΣAΛΟΝΙΚHΣ-THESSALONIKI METRO EPΓO: CON-06 / 004 - PROJECT: CON-06 / 004

A 23.10.14 1G00PS250C702A_EN_00.DOC CBACS (Σύστηµα Κεντρικό Ελέγχου Αυτοµατισµού Κτιρίων)

<Greek Title> CBACS (Central Building Automation Control System)

DFD – System Architecture Block Diagrams

1G00PS250C702

Αναθ.-Rev.

Ηµ/νια-Date

Αρχείο-Filename Σελίδα-Page 13 / 14

4 Depot-CBACS’ Architecture Block Diagrams

4.1 General Description

Depot-CBACS’ HW components are installed and operate in the below listed locations:

• OCC rooms:

Equipment Room;

Central Control Room;

• Depot Control Room.

4.2 Architecture Drawings

Depot-CBACS’ architecture drawings are included in the Annex #2.

They show, for each HW component:

• Position in the relevant location;

• Power supply and network connecting cables’ relationship.

4.3 Cables Specifications

Mechanical Specifications:

CONDxSECTION TYPE D.ext Rmin Weight [kg/km]

3G1.5 XLPE 10.7 130 163

3G2.5 XLPE 11.06 140 205

3G4 XLPE 12.5 150 260

3G6 XLPE 14.3 170 369

3G10 XLPE 17 200 529

EMI Specifications:

MN NS 230Vac / 400Vac / 110Vdc / 24Vdc cables.

The Annex #3 defines the FROM TO Table (OCC and DCR).

Page 14: K97B >9

METPO ΘEΣΣAΛΟΝΙΚHΣ-THESSALONIKI METRO EPΓO: CON-06 / 004 - PROJECT: CON-06 / 004

A 23.10.14 1G00PS250C702A_EN_00.DOC CBACS (Σύστηµα Κεντρικό Ελέγχου Αυτοµατισµού Κτιρίων)

<Greek Title> CBACS (Central Building Automation Control System)

DFD – System Architecture Block Diagrams

1G00PS250C702

Αναθ.-Rev.

Ηµ/νια-Date

Αρχείο-Filename Σελίδα-Page 14 / 14

ΠΑΡΑΡΤΗΜΑΤΑ / APPENDICES

Α/Α R/N

ΚΩ∆ΙΚΟΣ CODE

ΤΙΤΛΟΣ TITLE

ΑΝΑΘΕΩΡΗΣΗ REVISION

1 01 CBACS

DFD – System Architecture Block Diagrams A

2 02 CBACS

DFD – System Architecture Block Diagrams A

3 03 CBACS

DFD – System Architecture Block Diagrams A

Page 15: K97B >9
Page 16: K97B >9
Page 17: K97B >9

Thess.M

etr

o.C

BA

CS

DF

D S

yste

m A

rchitectu

re B

lock D

iagra

ms-

AN

NE

X 3

Re

v.

A

PS

250

OC

CE

MI/E

MC

Are

aS

yste

mP

rog

ES

Are

aP

BS

Code / L

ocation

Function

Com

ponent

Description

Are

aP

BS

Code / L

ocation

Function

Com

ponent

Description

OIS

CO

ND

x S

EC

TY

PE

Dest

Rm

inE

MI

CB

AC

S001

1B

14P

S25A

-2.4

a.3

-PS

-01

Pow

er

Supply

Cabin

et

Pow

er

Supply

Cabin

et

1B

14P

S252-2

.4.5

6-W

S-0

1C

BA

CS

OC

C W

ork

sta

tion 0

1

3G

1.5

XLP

E10,7

130

MN

N

S100

Ro

utin

g

CB

AC

S002

1B

14P

S25A

-2.4

a.3

-PS

-01

Pow

er

Supply

Cabin

et

Pow

er

Supply

Cabin

et

1B

14P

S252-2

.4.5

6-W

S-0

2C

BA

CS

OC

C W

ork

sta

tion 0

23G

1.5

XLP

E10,7

130

MN

N

S100

Ro

utin

g

CB

AC

S003

1B

14P

S25A

-2.4

a.3

-PS

-01

Pow

er

Supply

Cabin

et

Pow

er

Supply

Cabin

et

1B

14P

S254-2

.4.5

6-W

S-0

1D

epot-

CB

AC

S O

CC

Work

sta

tion

3G

1.5

XLP

E10,7

130

MN

N

S100

Ro

utin

g

CB

AC

S004

1B

14P

S25A

-2.4

a.3

-PS

-01

Pow

er

Supply

Cabin

et

Pow

er

Supply

Cabin

et

1B

14P

S258-2

.4.5

6-W

S-0

1C

BA

CS

Safe

OC

C W

ork

sta

tion 0

1

3G

1.5

XLP

E10,7

130

MN

N

S100

Ro

utin

g

CB

AC

S005

1B

14P

S25A

-2.4

a.3

-PS

-01

Pow

er

Supply

Cabin

et

Pow

er

Supply

Cabin

et

1B

14P

S258-2

.4.5

6-W

S-0

2C

BA

CS

Safe

OC

C W

ork

sta

tion 0

23G

1.5

XLP

E10,7

130

MN

N

S100

Ro

utin

g

CB

AC

S006

1B

14P

S25A

-2.4

a.3

-PS

-01

Pow

er

Supply

Cabin

et

Pow

er

Supply

Cabin

et

1B

14P

S251-2

.4.5

6-B

P-0

1C

BA

CS

OC

C B

lack a

nd W

hite L

aser

Printe

r3G

1.5

XLP

E10,7

130

MN

N

S100

Ro

utin

g

CB

AC

S007

1B

14P

S25A

-2.4

a.3

-PS

-01

Pow

er

Supply

Cabin

et

Pow

er

Supply

Cabin

et

1B

14P

S251-2

.4.5

6-C

P-0

1C

BA

CS

OC

C C

olo

r Laser

Printe

r3G

1.5

XLP

E10,7

130

MN

N

S100

Ro

utin

g

CB

AC

S008

1B

14P

S25A

-2.4

a.3

-PS

-01

Pow

er

Supply

Cabin

et

Pow

er

Supply

Cabin

et

1B

14P

S253-2

.4.5

6-B

P-0

1D

epot-

CB

AC

S O

CC

Bla

ck a

nd W

hite L

aser

Printe

r3G

1.5

XLP

E10,7

130

MN

N

S100

Ro

utin

g

CB

AC

S009

1B

14P

S25A

-2.4

a.3

-PS

-01

Pow

er

Supply

Cabin

et

Pow

er

Supply

Cabin

et

1B

14P

S253-2

.4.5

6-C

P-0

1D

epot-

CB

AC

S O

CC

Colo

r Laser

Printe

r3G

1.5

XLP

E10,7

130

MN

N

S100

Ro

utin

g

CB

AC

S010

1B

14P

S25A

-2.4

a.3

-PS

-01

Pow

er

Supply

Cabin

et

Pow

er

Supply

Cabin

et

1B

14P

S256-2

.4a.6

-RK

-01

C

BA

CS

OC

C S

erv

er

Rack

3G

2.5

XLP

E11,0

6140

MN

N

SLin

e 1

100

Ro

utin

g

CB

AC

S011

1B

14P

S25A

-2.4

a.3

-PS

-01

Pow

er

Supply

Cabin

et

Pow

er

Supply

Cabin

et

1B

14P

S256-2

.4a.6

-RK

-01

C

BA

CS

OC

C S

erv

er

Rack

3G

2.5

XLP

E11,0

6140

MN

N

SLin

e 2

100

Ro

utin

g

CB

AC

S012

1B

14P

S25A

-2.4

a.3

-PS

-01

Pow

er

Supply

Cabin

et

Pow

er

Supply

Cabin

et

1B

14P

S251-2

.4a.6

-LP

-01

CB

AC

S O

CC

Lin

e P

rinte

r3G

1.5

XLP

E10,7

130

MN

N

S100

Ro

utin

g

CB

AC

S013

1B

14P

S25A

-2.4

a.3

-PS

-01

Pow

er

Supply

Cabin

et

Pow

er

Supply

Cabin

et

1B

14P

S253-2

.4a.6

-LP

-01

Depot-

CB

AC

S O

CC

Lin

e P

rinte

r3G

1.5

XLP

E10,7

130

MN

N

S100

Ro

utin

g

CB

AC

S014

1B

14P

S25A

-2.4

a.3

-PS

-01

Pow

er

Supply

Cabin

et

Pow

er

Supply

Cabin

et

1B

14P

S252-2

.4a.1

0-W

S-0

1C

BA

CS

OC

C M

ain

tenance W

ork

sta

tion

3G

1.5

XLP

E10,7

130

MN

N

S100

Ro

utin

g

CB

AC

S015

1B

14P

S25A

-2.4

a.3

-PS

-01

Pow

er

Supply

Cabin

et

Pow

er

Supply

Cabin

et

1B

14P

S251-2

.4a.1

0-B

P-0

1C

BA

CS

OC

C M

ain

tenance B

lack a

nd W

hite L

aser

Printe

r3G

1.5

XLP

E10,7

130

MN

N

S100

Ro

utin

g

CB

AC

S016

1B

14P

S25B

-2.4

.46-P

D-0

1

Pow

er

Dis

trib

ution B

ox

Pow

er

Dis

trib

ution B

ox

1B

14P

S253-2

.4.4

6-B

P-0

1D

epot-

CB

AC

S D

CR

Bla

ck a

nd W

hite L

aser

Printe

r3G

1.5

XLP

E10,7

130

MN

N

S100

Ro

utin

g

CB

AC

S017

1B

14P

S25B

-2.4

.46-P

D-0

1

Pow

er

Dis

trib

ution B

ox

Pow

er

Dis

trib

ution B

ox

1B

14P

S253-2

.4.4

6-L

P-0

1D

epot-

CB

AC

S D

CR

Lin

e P

rinte

r3G

1.5

XLP

E10,7

130

MN

N

S100

Ro

utin

g

CB

AC

S018

1B

14P

S25B

-2.4

.46-P

D-0

1

Pow

er

Dis

trib

ution B

ox

Pow

er

Dis

trib

ution B

ox

1B

14P

S254-2

.4.4

6-W

S-0

1D

epot-

CB

AC

S D

CR

Work

sta

tion

3G

1.5

XLP

E10,7

130

MN

N

S100

Ro

utin

g

CB

AC

S019

1B

14P

S25A

-2.4

a.3

-PS

-01

Pow

er

Supply

Cabin

et

Pow

er

Supply

Cabin

et

1B

14P

S25B

-2.4

.46-P

D-0

1

Pow

er

Dis

trib

ution B

ox

3G

1.5

XLP

E10,7

130

MN

N

S100

Ro

utin

g

CB

AC

S020

DT

SR

IT

D

TS

R IT

Eth

ern

et S

witch

1B

14P

S252-2

.4.5

6-W

S-0

1C

BA

CS

OC

C W

ork

sta

tion 0

1

8 x

24A

WG

FT

P C

AT

5e

100

Ro

utin

g

CB

AC

S021

DT

SR

IT

D

TS

R IT

Eth

ern

et S

witch

1B

14P

S252-2

.4.5

6-W

S-0

2C

BA

CS

OC

C W

ork

sta

tion 0

28 x

24A

WG

FT

P C

AT

5e

100

Ro

utin

g

CB

AC

S022

DT

SR

IT

D

TS

R IT

Eth

ern

et S

witch

1B

14P

S254-2

.4.5

6-W

S-0

1D

epot-

CB

AC

S O

CC

Work

sta

tion

8 x

24A

WG

FT

P C

AT

5e

100

Ro

utin

g

CB

AC

S023

DT

SR

IT

D

TS

R IT

Eth

ern

et S

witch

1B

14P

S258-2

.4.5

6-W

S-0

1C

BA

CS

Safe

OC

C W

ork

sta

tion 0

1

8 x

24A

WG

FT

P C

AT

5e

100

Ro

utin

g

CB

AC

S024

DT

SR

IT

D

TS

R IT

Eth

ern

et S

witch

1B

14P

S258-2

.4.5

6-W

S-0

2C

BA

CS

Safe

OC

C W

ork

sta

tion 0

28 x

24A

WG

FT

P C

AT

5e

100

Ro

utin

g

CB

AC

S025

DT

SR

IT

D

TS

R IT

Eth

ern

et S

witch

1B

14P

S251-2

.4.5

6-B

P-0

1C

BA

CS

OC

C B

lack a

nd W

hite L

aser

Printe

r8 x

24A

WG

FT

P C

AT

5e

100

Ro

utin

g

CB

AC

S026

DT

SR

IT

D

TS

R IT

Eth

ern

et S

witch

1B

14P

S251-2

.4.5

6-C

P-0

1C

BA

CS

OC

C C

olo

r Laser

Printe

r8 x

24A

WG

FT

P C

AT

5e

100

Ro

utin

g

CB

AC

S027

DT

SR

IT

D

TS

R IT

Eth

ern

et S

witch

1B

14P

S253-2

.4.5

6-B

P-0

1D

epot-

CB

AC

S O

CC

Bla

ck a

nd W

hite L

aser

Printe

r8 x

24A

WG

FT

P C

AT

5e

100

Ro

utin

g

CB

AC

S028

DT

SR

IT

D

TS

R IT

Eth

ern

et S

witch

1B

14P

S253-2

.4.5

6-C

P-0

1D

epot-

CB

AC

S O

CC

Colo

r Laser

Printe

r8 x

24A

WG

FT

P C

AT

5e

100

Ro

utin

g

CB

AC

S029

DT

SR

IT

D

TS

R IT

Eth

ern

et S

witch

1B

14P

S256-2

.4a.6

-RK

-01

C

BA

CS

OC

C S

erv

er

Rack

8 x

24A

WG

FT

P C

AT

5e

100

Ro

utin

g

Fro

m T

o C

ab

le t

ab

le D

oc N

um

ber:

1G

00P

S250C

702A

_E

N_03

L T

ot

(ml)

EN

DIN

G E

QU

IPM

EN

T

Su

bsyste

m C

od

e :

Lo

cati

on

Co

de :

CA

BL

E D

AT

AM

OD

No

te

Tech

nic

al d

escri

pti

on

: C

BA

CS

Lo

cati

on

descri

pti

on

:

L P

arz

(ml)

OC

C a

nd

Sta

tio

n M

aste

r R

oo

ms

CA

BL

E N

UM

BE

RS

TA

RT

ING

EQ

UIP

ME

NT

Are

a

tran

s

1/2

Page 18: K97B >9

Thess.M

etr

o.C

BA

CS

DF

D S

yste

m A

rchitectu

re B

lock D

iagra

ms-

AN

NE

X 3

Re

v.

A

PS

250

OC

CE

MI/E

MC

Are

aS

yste

mP

rog

ES

Are

aP

BS

Code / L

ocation

Function

Com

ponent

Description

Are

aP

BS

Code / L

ocation

Function

Com

ponent

Description

OIS

CO

ND

x S

EC

TY

PE

Dest

Rm

inE

MI

Fro

m T

o C

ab

le t

ab

le D

oc N

um

ber:

1G

00P

S250C

702A

_E

N_03

L T

ot

(ml)

EN

DIN

G E

QU

IPM

EN

T

Su

bsyste

m C

od

e :

Lo

cati

on

Co

de :

CA

BL

E D

AT

AM

OD

No

te

Tech

nic

al d

escri

pti

on

: C

BA

CS

Lo

cati

on

descri

pti

on

:

L P

arz

(ml)

OC

C a

nd

Sta

tio

n M

aste

r R

oo

ms

CA

BL

E N

UM

BE

RS

TA

RT

ING

EQ

UIP

ME

NT

Are

a

tran

s

CB

AC

S030

DT

SR

IT

D

TS

R IT

Eth

ern

et S

witch

1B

14P

S256-2

.4a.6

-RK

-01

C

BA

CS

OC

C S

erv

er

Rack

8 x

24A

WG

FT

P C

AT

5e

100

Ro

utin

g

CB

AC

S031

DT

SR

IT

D

TS

R IT

Eth

ern

et S

witch

1B

14P

S256-2

.4a.6

-RK

-01

C

BA

CS

OC

C S

erv

er

Rack

8 x

24A

WG

FT

P C

AT

5e

100

Ro

utin

g

CB

AC

S032

DT

SR

IT

D

TS

R IT

Eth

ern

et S

witch

1B

14P

S256-2

.4a.6

-RK

-01

C

BA

CS

OC

C S

erv

er

Rack

8 x

24A

WG

FT

P C

AT

5e

100

Ro

utin

g

CB

AC

S033

DT

SR

IT

D

TS

R IT

Eth

ern

et S

witch

1B

14P

S256-2

.4a.6

-RK

-01

C

BA

CS

OC

C S

erv

er

Rack

8 x

24A

WG

FT

P C

AT

5e

100

Ro

utin

g

CB

AC

S034

DT

SR

IT

D

TS

R IT

Eth

ern

et S

witch

1B

14P

S256-2

.4a.6

-RK

-01

C

BA

CS

OC

C S

erv

er

Rack

8 x

24A

WG

FT

P C

AT

5e

100

Ro

utin

g

CB

AC

S035

DT

SR

IT

D

TS

R IT

Eth

ern

et S

witch

1B

14P

S251-2

.4a.6

-LP

-01

CB

AC

S O

CC

Lin

e P

rinte

r8 x

24A

WG

FT

P C

AT

5e

100

Ro

utin

g

CB

AC

S036

DT

SR

IT

D

TS

R IT

Eth

ern

et S

witch

1B

14P

S253-2

.4a.6

-LP

-01

Depot-

CB

AC

S O

CC

Lin

e P

rinte

r8 x

24A

WG

FT

P C

AT

5e

100

Ro

utin

g

CB

AC

S037

DT

SR

IT

D

TS

R IT

Eth

ern

et S

witch

1B

14P

S252-2

.4a.1

0-W

S-0

1C

BA

CS

OC

C M

ain

tenance W

ork

sta

tion

8 x

24A

WG

FT

P C

AT

5e

100

Ro

utin

g

CB

AC

S038

DT

SR

IT

D

TS

R IT

Eth

ern

et S

witch

1B

14P

S251-2

.4a.1

0-B

P-0

1C

BA

CS

OC

C M

ain

tenance B

lack a

nd W

hite L

aser

Printe

r8 x

24A

WG

FT

P C

AT

5e

100

Ro

utin

g

CB

AC

S039

DT

SR

IT

D

TS

R IT

Eth

ern

et S

witch

1B

14P

S253-2

.4.4

6-B

P-0

1D

epot-

CB

AC

S D

CR

Bla

ck a

nd W

hite L

aser

Printe

r8 x

24A

WG

FT

P C

AT

5e

100

Ro

utin

g

CB

AC

S040

DT

SR

IT

D

TS

R IT

Eth

ern

et S

witch

1B

14P

S253-2

.4.4

6-L

P-0

1D

epot-

CB

AC

S D

CR

Lin

e P

rinte

r8 x

24A

WG

FT

P C

AT

5e

100

Ro

utin

g

CB

AC

S041

DT

SR

IT

D

TS

R IT

Eth

ern

et S

witch

1B

14P

S254-2

.4.4

6-W

S-0

1D

epot-

CB

AC

S D

CR

Work

sta

tion

8 x

24A

WG

FT

P C

AT

5e

100

Ro

utin

g

CB

AC

S042

SM

R P

DP

SM

R P

ow

er

Dis

trib

ution P

anel

1S

##P

S252-2

.3-W

S-0

1C

BA

CS

SM

R W

ork

sta

tion

3G

1.5

XLP

E10,7

130

MN

N

S100

Ro

utin

g

CB

AC

S043

SM

R P

DP

SM

R P

ow

er

Dis

trib

ution P

anel

1S

##P

S259-2

.3-W

S-0

1C

BA

CS

Safe

SM

R W

ork

sta

tion

3G

1.5

XLP

E10,7

130

MN

N

S100

Ro

utin

g

CB

AC

S044

SM

R P

DP

SM

R P

ow

er

Dis

trib

ution P

anel

1S

##P

S251-2

.3-B

P-0

1C

BA

CS

SM

R B

lack a

nd W

hite L

aser

Printe

r3G

1.5

XLP

E10,7

130

MN

N

S100

Ro

utin

g

CB

AC

S045

SM

R P

DP

SM

R P

ow

er

Dis

trib

ution P

anel

1S

##P

S251-2

.3-L

P-0

1C

BA

CS

SM

R L

ine P

rinte

r3G

1.5

XLP

E10,7

130

MN

N

S100

Ro

utin

g

CB

AC

S046

DT

SR

IT

D

TS

R IT

Eth

ern

et S

witch

1S

##P

S252-2

.3-W

S-0

1C

BA

CS

SM

R W

ork

sta

tion

3G

1.5

XLP

E10,7

130

MN

N

S100

Ro

utin

g

CB

AC

S047

DT

SR

IT

D

TS

R IT

Eth

ern

et S

witch

1S

##P

S259-2

.3-W

S-0

1C

BA

CS

Safe

SM

R W

ork

sta

tion

3G

1.5

XLP

E10,7

130

MN

N

S100

Ro

utin

g

CB

AC

S048

DT

SR

IT

D

TS

R IT

Eth

ern

et S

witch

1S

##P

S251-2

.3-B

P-0

1C

BA

CS

SM

R B

lack a

nd W

hite L

aser

Printe

r3G

1.5

XLP

E10,7

130

MN

N

S100

Ro

utin

g

CB

AC

S049

DT

SR

IT

D

TS

R IT

Eth

ern

et S

witch

1S

##P

S251-2

.3-L

P-0

1C

BA

CS

SM

R L

ine P

rinte

r3G

1.5

XLP

E10,7

130

MN

N

S100

Ro

utin

g LE

GE

ND

:

MO

D:

cab

le r

ev

isio

n in

de

x (

it t

ake

s t

he

fo

llo

win

g v

alu

es:e

mp

ty f

or

the

fir

st

do

cu

me

nt

em

issio

n;

for

the

ne

xt

em

issio

ns:

em

pty

fo

r n

ot

ch

an

ge

d c

ab

le, N

fo

r n

ew

en

try

cab

le , V

fo

r m

od

ifie

d c

ab

le, E

fo

r d

ele

ted

cab

le)

(*)

In c

ase

th

e c

ab

le e

nd

s in

to a

n a

no

the

r su

bsy

ste

ms' E

QU

IPM

EN

T, th

e e

nd

ing

EQ

UIP

ME

NT

data

mu

st

be

un

ivo

cal fo

r b

oth

th

e s

ub

sy

ste

ms. M

ore

ov

er,

th

e su

bsy

ste

ms m

ust

be

re

sp

on

sib

le f

or

en

din

g E

QU

IPM

EN

T d

ata

.

DE

ST

: C

able

ext

ern

al dia

mete

r

Rm

in: M

inim

um

cable

radiu

s o

f curv

atu

re

EM

I: E

MI C

ode

L p

arz

(m

l):c

ab

le le

ng

th r

ou

ted

in

to t

he

lo

cality

L t

ot

(ml)

: m

ax

imu

m d

esig

n c

ab

le le

ng

th a

cco

rdin

g t

o its

fu

ncti

on

al e

lecte

rical ch

ara

cte

risti

cs,e

xp

resse

d in

lin

ear

me

ters

NO

TE

S:

em

pty

sp

ace

fo

r n

ote

s a

nd

co

mm

en

ts

EM

I/E

MC

: E

MI fu

ncti

on

al se

gre

gati

on

cab

le c

hara

cte

risti

cs d

uri

ng

its

part

icu

lar

se

rvic

e a

cco

rdin

g t

o C

W/T

S-C

CB

-3.5

Ele

ctr

ical In

sta

lla

tio

n cap

. 6.4

.4

CO

ND

x S

EC

: num

bers

of c

onducto

rs (

cable

s)

and their s

ections

CA

BL

E N

UM

BE

R

Are

a: sta

rtin

g localit

y /cable

begin

nin

g

Sy

ste

m: cable

ow

ner

syste

m

ES

: C

able

ele

ctr

om

agnetic

ST

AR

TIN

G E

QU

IPM

EN

T:

EQ

UIP

ME

NT

fro

m w

hic

h t

he

cab

le b

eg

ins

OIS

: O

bje

ct Id

entification S

yste

m D

ocum

ent

OIS

: O

bje

ct Id

entification S

yste

m D

ocum

ent

TY

PE

: cable

com

merc

ial ty

polo

gy

PR

OG

: th

ree letters

pro

gre

ssiv

e n

um

bering lin

ked w

ith A

rea +

Syste

m

LC

: sta

rtin

g lo

cality

/cab

le b

eg

inn

ing

, p

lace

wh

ere

th

e E

QU

IPM

EN

T i

s s

et

CO

MP

AR

TM

EN

T:

for

EQ

UIP

ME

NT

asse

mb

lie

s

CO

MP

ON

EN

T:

rem

ark

ab

le e

lem

en

ts in

sid

e t

he

EQ

UIP

ME

NT

/Co

mp

art

me

nt

to w

hic

h c

ab

les m

ust

be

co

nn

ecte

d (

es. te

rmin

als

, sw

itch

bo

ard

s,e

cc)

DE

SC

RIP

TIO

N: short

description

LC

-e:

en

din

g lo

cality

/cab

le e

nd

ing

, p

lace

wh

ere

th

e e

nd

ing

EQ

UIP

ME

NT

is s

et

CO

MP

AR

TM

EN

T:

for

EQ

UIP

ME

NT

asse

mb

lie

s

CO

MP

ON

EN

T:

rem

ark

ab

le e

lem

en

ts in

sid

e t

he

EQ

UIP

ME

NT

/Co

mp

art

me

nt

to w

hic

h c

ab

les m

ust

be

co

nn

ecte

d (

es. te

rmin

al str

ips, sw

itch

bo

ard

s,e

cc)

OIS

: O

bje

ct Id

entification S

yste

m D

ocum

ent

DE

SC

RIP

TIO

N: short

description

LC

tra

ns:

locality

co

de

s in

wh

ich

th

e c

ab

le p

asse

s (

if t

he

re a

re),

no

t in

clu

din

g L

C e

LC

-e

EN

DIN

G E

QU

IPM

EN

T:

EQ

UIP

ME

NT

in

wh

ich

th

e c

ab

le e

nd

s (

*)

CA

BL

E IN

FO

RM

AT

ION

S:

mate

rial fe

atu

res

2/2