kab ps baukongress2016 - graz university of technologytunnel2016/images/documents/pdf... · of the...
TRANSCRIPT
ÖBB-Infrastruktur, GB PNA (öffentlich) 25.04.20168th International Conference "Tunnel Safety and Ventilation“ 2016Graz, April 2016
Incident tested –
Rescue, evacuation & fire protection
at the lot „Koralm Tunnel 2“A review of the fire event in 2015
and the practical implementation of
the concept in the event of an incident
Mag.(FH) Susanne Fehleisen MAS MSc
Projektleitung Koralmbahn 3 | ÖBB-Infrastruktur AG
Josef Frießnegg
ARGE KAT2
ÖBB-Infrastruktur, GB PNA (öffentlich) 25.04.20168th International Conference "Tunnel Safety and Ventilation“ 2016
The Koralm Railway
90% completed or
under construction130 kmnew railway
12 new stations and stops along theKoralm Railway
by 2023 fully operational
5,3 Mrd. €
45 minutesGraz - Klagenfurt
250 km/h maximum speed
33 km long
Koralm Tunnel
47 km of the tunnelcompleted or under construction
Klagenfurt Hbf.
Graz Hbf.
Bf. Weststeiermark
Bf. Lavanttal
100 bridges completed
or under construction
Wolfsberg
Tunnelkette
Granitztal
Baulose
Mittlern-Althofen
ÖBB-Infrastruktur, GB PNA (öffentlich) 25.04.20168th International Conference "Tunnel Safety and Ventilation“ 2016
Nothaltestelle Lüftungsbauwerk
Leibenfeld
Ostportal
Westportal
Baugrube
Mitterpichling
Offene
Bauweise
Lüftungsbauwerk
Paierdorf
SteiermarkKärnten
Vortriebs-
Richtungen
Seite 3
The Koralm Tunnel
17.933
17.591
2.363
10.478*
12,2 km
KAT3
10,5 km
17,2 km
KAT2
19,9 km
2,5 km
KAT1
2,5 km
Western
portal
Mitterpichling
intermediate
access
Mitterpichling
investigation
tunnel
Emergency
bay & refuge
room
Shaft
Leibenfeld
Eastern
portal
driving
directions
Carinthia Styria
ÖBB-Infrastruktur, GB PNA (öffentlich) 25.04.20168th International Conference "Tunnel Safety and Ventilation“ 2016
Lot Koralm Tunnel 2 - KAT2
ÖBB-Infrastruktur, GB PNA (öffentlich) 25.04.20168th International Conference "Tunnel Safety and Ventilation“ 2016
Safety-related Parameters
Entrance via
shafts
Evacuationroutes
Machine driving
17 km
Only rail-bound
600 Employees
Ventilation
ÖBB-Infrastruktur, GB PNA (öffentlich) 25.04.20168th International Conference "Tunnel Safety and Ventilation“ 2016
Safety planning
Entrance via
shafts
Evacuationroutes
Machine driving
17 km
Only rail-bound
600 Employees
Ventilation
ÖBB-Infrastruktur, GB PNA (öffentlich) 25.04.20168th International Conference "Tunnel Safety and Ventilation“ 2016
Escape routes
ÖBB-Infrastruktur, GB PNA (öffentlich) 25.04.20168th International Conference "Tunnel Safety and Ventilation“ 2016
Rescue train for construction phase
ÖBB-Infrastruktur, GB PNA (öffentlich) 25.04.20168th International Conference "Tunnel Safety and Ventilation“ 2016
Safety centre
ÖBB-Infrastruktur, GB PNA (öffentlich) 25.04.20168th International Conference "Tunnel Safety and Ventilation“ 2016
Preventative emergency planning
ÖBB-Infrastruktur, GB PNA (öffentlich) 25.04.20168th International Conference "Tunnel Safety and Ventilation“ 2016
Trainings
ÖBB-Infrastruktur, GB PNA (öffentlich) 25.04.20168th International Conference "Tunnel Safety and Ventilation“ 2016
February 05th, 2015
12:50 p.m.
ÖBB-Infrastruktur, GB PNA (öffentlich) 25.04.20168th International Conference "Tunnel Safety and Ventilation“ 2016
The situation underground
ÖBB-Infrastruktur, GB PNA (öffentlich) 25.04.20168th International Conference "Tunnel Safety and Ventilation“ 2016
Emergency management
Implementation of the alarm plan
Set up of the operational leadership
Determination of immediate actions
ventilation, evacuation, personnel
identification
Planning of the rescue operation
underground
Press & media work
ÖBB-Infrastruktur, GB PNA (öffentlich) 25.04.20168th International Conference "Tunnel Safety and Ventilation“ 2016
Rescue and evacuation measures
ÖBB-Infrastruktur, GB PNA (öffentlich) 25.04.20168th International Conference "Tunnel Safety and Ventilation“ 2016
Cause of fire
ÖBB-Infrastruktur, GB PNA (öffentlich) 25.04.20168th International Conference "Tunnel Safety and Ventilation“ 2016
Summary
12:50 Information about a fire to safety centre
13:06 first message via facebook
ÖBB-Infrastruktur, GB PNA (öffentlich) 25.04.20168th International Conference "Tunnel Safety and Ventilation“ 2016
Rescue & evacuation
concept
Train driver Guide (underground)
Limits of identification
system
Success factors
1. preparation
2. clear decision structure
3. complying with instructions
Summary
ÖBB-Infrastruktur, GB PNA (öffentlich) 25.04.20168th International Conference "Tunnel Safety and Ventilation“ 2016
ÖBB-Infrastruktur, GB PNA (öffentlich) 25.04.20168th International Conference "Tunnel Safety and Ventilation“ 2016
Thank you!