ÖBB-Infrastruktur, GB PNA (öffentlich) 25.04.2016 8 th International Conference "Tunnel Safety and Ventilation“ 2016 Graz, April 2016 Incident tested Rescue, evacuation & fire protection at the lot „Koralm Tunnel 2“ A review of the fire event in 2015 and the practical implementation of the concept in the event of an incident Mag.(FH) Susanne Fehleisen MAS MSc Projektleitung Koralmbahn 3 | ÖBB-Infrastruktur AG Josef Frießnegg ARGE KAT2

Upload: lammien

Post on 28-Apr-2018

219 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: KAB PS Baukongress2016 - Graz University of Technologytunnel2016/images/documents/PDF... · of the tunnel completed or under construction ... 19,9 km 2,5 km ... 8th International

ÖBB-Infrastruktur, GB PNA (öffentlich) 25.04.20168th International Conference "Tunnel Safety and Ventilation“ 2016Graz, April 2016

Incident tested –

Rescue, evacuation & fire protection

at the lot „Koralm Tunnel 2“A review of the fire event in 2015

and the practical implementation of

the concept in the event of an incident

Mag.(FH) Susanne Fehleisen MAS MSc

Projektleitung Koralmbahn 3 | ÖBB-Infrastruktur AG

Josef Frießnegg

ARGE KAT2

Page 2: KAB PS Baukongress2016 - Graz University of Technologytunnel2016/images/documents/PDF... · of the tunnel completed or under construction ... 19,9 km 2,5 km ... 8th International

ÖBB-Infrastruktur, GB PNA (öffentlich) 25.04.20168th International Conference "Tunnel Safety and Ventilation“ 2016

The Koralm Railway

90% completed or

under construction130 kmnew railway

12 new stations and stops along theKoralm Railway

by 2023 fully operational

5,3 Mrd. €

45 minutesGraz - Klagenfurt

250 km/h maximum speed

33 km long

Koralm Tunnel

47 km of the tunnelcompleted or under construction

Klagenfurt Hbf.

Graz Hbf.

Bf. Weststeiermark

Bf. Lavanttal

100 bridges completed

or under construction

Wolfsberg

Tunnelkette

Granitztal

Baulose

Mittlern-Althofen

Page 3: KAB PS Baukongress2016 - Graz University of Technologytunnel2016/images/documents/PDF... · of the tunnel completed or under construction ... 19,9 km 2,5 km ... 8th International

ÖBB-Infrastruktur, GB PNA (öffentlich) 25.04.20168th International Conference "Tunnel Safety and Ventilation“ 2016

Nothaltestelle Lüftungsbauwerk

Leibenfeld

Ostportal

Westportal

Baugrube

Mitterpichling

Offene

Bauweise

Lüftungsbauwerk

Paierdorf

SteiermarkKärnten

Vortriebs-

Richtungen

Seite 3

The Koralm Tunnel

17.933

17.591

2.363

10.478*

12,2 km

KAT3

10,5 km

17,2 km

KAT2

19,9 km

2,5 km

KAT1

2,5 km

Western

portal

Mitterpichling

intermediate

access

Mitterpichling

investigation

tunnel

Emergency

bay & refuge

room

Shaft

Leibenfeld

Eastern

portal

driving

directions

Carinthia Styria

Page 4: KAB PS Baukongress2016 - Graz University of Technologytunnel2016/images/documents/PDF... · of the tunnel completed or under construction ... 19,9 km 2,5 km ... 8th International

ÖBB-Infrastruktur, GB PNA (öffentlich) 25.04.20168th International Conference "Tunnel Safety and Ventilation“ 2016

Lot Koralm Tunnel 2 - KAT2

Page 5: KAB PS Baukongress2016 - Graz University of Technologytunnel2016/images/documents/PDF... · of the tunnel completed or under construction ... 19,9 km 2,5 km ... 8th International

ÖBB-Infrastruktur, GB PNA (öffentlich) 25.04.20168th International Conference "Tunnel Safety and Ventilation“ 2016

Safety-related Parameters

Entrance via

shafts

Evacuationroutes

Machine driving

17 km

Only rail-bound

600 Employees

Ventilation

Page 6: KAB PS Baukongress2016 - Graz University of Technologytunnel2016/images/documents/PDF... · of the tunnel completed or under construction ... 19,9 km 2,5 km ... 8th International

ÖBB-Infrastruktur, GB PNA (öffentlich) 25.04.20168th International Conference "Tunnel Safety and Ventilation“ 2016

Safety planning

Entrance via

shafts

Evacuationroutes

Machine driving

17 km

Only rail-bound

600 Employees

Ventilation

Page 7: KAB PS Baukongress2016 - Graz University of Technologytunnel2016/images/documents/PDF... · of the tunnel completed or under construction ... 19,9 km 2,5 km ... 8th International

ÖBB-Infrastruktur, GB PNA (öffentlich) 25.04.20168th International Conference "Tunnel Safety and Ventilation“ 2016

Escape routes

Page 8: KAB PS Baukongress2016 - Graz University of Technologytunnel2016/images/documents/PDF... · of the tunnel completed or under construction ... 19,9 km 2,5 km ... 8th International

ÖBB-Infrastruktur, GB PNA (öffentlich) 25.04.20168th International Conference "Tunnel Safety and Ventilation“ 2016

Rescue train for construction phase

Page 9: KAB PS Baukongress2016 - Graz University of Technologytunnel2016/images/documents/PDF... · of the tunnel completed or under construction ... 19,9 km 2,5 km ... 8th International

ÖBB-Infrastruktur, GB PNA (öffentlich) 25.04.20168th International Conference "Tunnel Safety and Ventilation“ 2016

Safety centre

Page 10: KAB PS Baukongress2016 - Graz University of Technologytunnel2016/images/documents/PDF... · of the tunnel completed or under construction ... 19,9 km 2,5 km ... 8th International

ÖBB-Infrastruktur, GB PNA (öffentlich) 25.04.20168th International Conference "Tunnel Safety and Ventilation“ 2016

Preventative emergency planning

Page 11: KAB PS Baukongress2016 - Graz University of Technologytunnel2016/images/documents/PDF... · of the tunnel completed or under construction ... 19,9 km 2,5 km ... 8th International

ÖBB-Infrastruktur, GB PNA (öffentlich) 25.04.20168th International Conference "Tunnel Safety and Ventilation“ 2016

Trainings

Page 12: KAB PS Baukongress2016 - Graz University of Technologytunnel2016/images/documents/PDF... · of the tunnel completed or under construction ... 19,9 km 2,5 km ... 8th International

ÖBB-Infrastruktur, GB PNA (öffentlich) 25.04.20168th International Conference "Tunnel Safety and Ventilation“ 2016

February 05th, 2015

12:50 p.m.

Page 13: KAB PS Baukongress2016 - Graz University of Technologytunnel2016/images/documents/PDF... · of the tunnel completed or under construction ... 19,9 km 2,5 km ... 8th International

ÖBB-Infrastruktur, GB PNA (öffentlich) 25.04.20168th International Conference "Tunnel Safety and Ventilation“ 2016

The situation underground

Page 14: KAB PS Baukongress2016 - Graz University of Technologytunnel2016/images/documents/PDF... · of the tunnel completed or under construction ... 19,9 km 2,5 km ... 8th International

ÖBB-Infrastruktur, GB PNA (öffentlich) 25.04.20168th International Conference "Tunnel Safety and Ventilation“ 2016

Emergency management

Implementation of the alarm plan

Set up of the operational leadership

Determination of immediate actions

ventilation, evacuation, personnel

identification

Planning of the rescue operation

underground

Press & media work

Page 15: KAB PS Baukongress2016 - Graz University of Technologytunnel2016/images/documents/PDF... · of the tunnel completed or under construction ... 19,9 km 2,5 km ... 8th International

ÖBB-Infrastruktur, GB PNA (öffentlich) 25.04.20168th International Conference "Tunnel Safety and Ventilation“ 2016

Rescue and evacuation measures

Page 16: KAB PS Baukongress2016 - Graz University of Technologytunnel2016/images/documents/PDF... · of the tunnel completed or under construction ... 19,9 km 2,5 km ... 8th International

ÖBB-Infrastruktur, GB PNA (öffentlich) 25.04.20168th International Conference "Tunnel Safety and Ventilation“ 2016

Cause of fire

Page 17: KAB PS Baukongress2016 - Graz University of Technologytunnel2016/images/documents/PDF... · of the tunnel completed or under construction ... 19,9 km 2,5 km ... 8th International

ÖBB-Infrastruktur, GB PNA (öffentlich) 25.04.20168th International Conference "Tunnel Safety and Ventilation“ 2016

Summary

12:50 Information about a fire to safety centre

13:06 first message via facebook

Page 18: KAB PS Baukongress2016 - Graz University of Technologytunnel2016/images/documents/PDF... · of the tunnel completed or under construction ... 19,9 km 2,5 km ... 8th International

ÖBB-Infrastruktur, GB PNA (öffentlich) 25.04.20168th International Conference "Tunnel Safety and Ventilation“ 2016

Rescue & evacuation

concept

Train driver Guide (underground)

Limits of identification

system

Success factors

1. preparation

2. clear decision structure

3. complying with instructions

Summary

Page 19: KAB PS Baukongress2016 - Graz University of Technologytunnel2016/images/documents/PDF... · of the tunnel completed or under construction ... 19,9 km 2,5 km ... 8th International

ÖBB-Infrastruktur, GB PNA (öffentlich) 25.04.20168th International Conference "Tunnel Safety and Ventilation“ 2016

Page 20: KAB PS Baukongress2016 - Graz University of Technologytunnel2016/images/documents/PDF... · of the tunnel completed or under construction ... 19,9 km 2,5 km ... 8th International

ÖBB-Infrastruktur, GB PNA (öffentlich) 25.04.20168th International Conference "Tunnel Safety and Ventilation“ 2016