kanban card calculator

19
1 7 8 1st 2nd 4 Ready 1 2 3 4 5 6 2 3 4 5 15 Machining 6 7 8 9 7 8 7 Fetting 9 10 11 1

Upload: harshananad-kalge

Post on 25-Oct-2014

38 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Kanban Card Calculator

1 7 8

1st 2nd

4

Ready 1 2 3 4 5 6 2 3 4 5

15

Machining 6 7 8 9 7 8

7Fetting 9 10 11 1 10 11

Page 2: Kanban Card Calculator

17

15

8th 9th 15th

6 2 3 4 5 6 7 3 4 5 6 2 3 4

9 7 8 1 10 8

1 10 11 9 2 11

1 week over 2nd Week over

Page 3: Kanban Card Calculator

0

15th 15th

5 6 2 3 4 5

1 7 8 1 7 8

9 10 11 9 10 11

2nd Week over 2nd Week over

Page 4: Kanban Card Calculator

Kanban Bin Calculation Sheet

E+H Monthly Reqt 175Weekly Reqt 44

7

Stage

Ready for Pack co 15 0 60 60 100% 109 5 300 300 175 3Machining 20 15 60 60 100% 255 7 420 120 109 2Fettling 0 20 60 60 100% 146 7 420 300 255 5Shelling 10 0 60 60 100% 73 4 240 180 146 3

Wax Assembly 0 10 60 60 100% 73 3 180 120 73 21020 758 15

Daily Avg Production Reqt (DDQ)

Transit Lead Time (TLT)

Production Lead Time (PLT)

Batch Size (Kanban Qty) KQ

Delivery minimum lot size (DMLS)

% of Schedule Adherence (PSA)

Demand During Lead Time (DDL)

Toal No of Kanban Cards (TNKC)

Total Quantity of Material

Max. Stock

Min. Stock

No of Green Cards: NGC

H13
Two time stock demad = Safety stock + stock carry to lead time and
Page 5: Kanban Card Calculator

Wax

2521

111

No of Red Cards: NYC

Page 6: Kanban Card Calculator

Kanban Bin Calculation Sheet

A B C D E F G H I J KE+H Monthly Reqt 182Weekly Reqt 46

8

Stage

Wax Injuction/Raw Or 0 2 10 10 100% 15 3 30 1 1 1Assembly/Forging 0 7 32 32 100% 53 3 106 1 1 1Shelling/Machinin 0 2 10 10 100% 15 3 30 1 1 1Pouring 0 2 10 10 100% 15 3 30 1 1 1Fettling 0 2 10 10 100% 15 3 30 1 1 1

0 2 10 10 100% 15 3 30 1 1 1

Daily Avg Production Reqt (DDQ)

Transit Lead Time (TLT)

Production Lead Time (PLT)

Batch Size (Kanban Qty) KQ

Delivery minimum lot size (DMLS)

% of Schedule Adherence (PSA)

Demand During Lead Time (DDL)

Number of Cards Necessary for DDL (Toal No of Kanban Cards) (TNKC)

Total Quantity of Material

No of Green Cards: NGC

No of Yellow Cards: NYC

No of Red Cards:NRC

Ready for Pack condition

Page 7: Kanban Card Calculator

Wax

L

300

300

300

300

300

300

Prodn capacity/ Day

Page 8: Kanban Card Calculator

Customer Monthly Reqt 1200 300Weekly Reqt 300Definition and Distribution of Kanban Cards *yellow cells are the input fields

Daily demand quantities*(DDQ) 50 Ml of units Pounds, grams, pieces, etc. (MI = metric increment)Transport lead time days*(TLT) 5 Days Vendor lead timeProduction lead time days*(PLT) 0 Days Internal lead time

Container/palett capacity*(Kanban Qty) KQ 32 Ml of units Pounds, grams, pieces, etc. (MI = metric increment)

% of Schedule Adherence (A) 100% Percentage internal attrition or scrap

Delivery minimum lot size* (DMLS) 32 ML hastes Defined according to vendor constrains or work center constraints

No of Location for Stock* NOL 0

Working Shifts/Day 2

Hours/Shift 8

Total Downtime 3

Shift Effn 80%

250 Ml of units A*(DDQ*(TLT+PLT)

Number of Cards Necessary for DDL (TNKC) 45 Number of cards

Safety Margin (No of Cards) 38 Number of cards

Total quantity of material 1450 Ml of units b5 (DDQ) = c11 1290Days of demand coverage 29 Days b6 = (TLT)= B13

0 b7=(PLT) = C13Average customer demand /Hr(Takt Time) 0

b8 KQ D13

Card Distribution b10 (DMLS) =E13

Above Reorder Point >> # of Green Cards NGC 1 b18 (TNKC) H 13

Above Reorder Point >> # of Yellow Cards:NY 7 Red Reorder points

Below Safety Margin >> # of Red Cards:NRC 37 Gre

Safety stock (Percentage of demand during lead time) Demand During Lead Time (DDL)

Total Required Inventory (TRI) = DDQ*(TLT+PLT)*NOL

Page 9: Kanban Card Calculator

if IF(TNKC<=3,1,(IF(ROUNDUP(IF(TNKC<=3,1,((PLT+TLT)*DDQ)/KQ),0)+NGC>=TNKC,ROUNDUP(IF(TNKC<=3,1,((PLT+TLT)*DDQ)/KQ),0)-1,ROUNDUP(IF(TNKC<=3,1,((PLT+TLT)*DDQ)/KQ),0)))-NGC)

Page 10: Kanban Card Calculator

7.812537.5

45.3125

Page 11: Kanban Card Calculator

IF(TNKC<=3,1,(IF(ROUNDUP(IF(TNKC<=3,1,((PLT+TLT)*DDQ)/KQ),0)+NGC>=TNKC,ROUNDUP(IF(TNKC<=3,1,((PLT+TLT)*DDQ)/KQ),0)-1,ROUNDUP(IF(TNKC<=3,1,((PLT+TLT)*DDQ)/KQ),0)))-NGC)

Page 12: Kanban Card Calculator

IF(TNKC<=3,1,(IF(ROUNDUP(IF(TNKC<=3,1,((PLT+TLT)*DDQ)/KQ),0)+NGC>=TNKC,ROUNDUP(IF(TNKC<=3,1,((PLT+TLT)*DDQ)/KQ),0)-1,ROUNDUP(IF(TNKC<=3,1,((PLT+TLT)*DDQ)/KQ),0)))-NGC)

Page 13: Kanban Card Calculator

Customer Monthly Reqt 160 40Weekly Reqt 40Definition and Distribution of Kanban Cards *yellow cells are the input fields

Daily demand quantities*(DDQ) 7 Ml of units Pounds, grams, pieces, etc. (MI = metric increment)Transport lead time days*(TLT) 0 Days Vendor lead timeProduction lead time days*(PLT) 15 Days Internal lead time

Container/palett capacity*(Kanban Qty) KQ 32 Ml of units Pounds, grams, pieces, etc. (MI = metric increment)

% of Schedule Adherence (A) 100% Percentage internal attrition or scrap

Delivery minimum lot size* (DMLS) 32 ML hastes Defined according to vendor constrains or work center constraints

No of Location for Stock* NOL 0

Working Shifts/Day 2

Hours/Shift 8

Total Downtime 3

Shift Effn 80%

100 Ml of units A*(DDQ*(TLT+PLT)

11 Number of cards

Safety Margin (No of Cards) 9 Number of cards

Total quantity of material 360 Ml of units b5 (DDQ) = c11Days of demand coverage 54 Days b6 = (TLT)= B13

0 b7=(PLT) = C13Average customer demand /Hr(Takt Time) 2

b8 KQ D13

Card Distribution b10 (DMLS) =E13

Above Reorder Point >> # of Yellow Cards:NY 3 Red Reorder points

Below Safety Margin >> # of Red Cards:NRC 8 Gre

Safety stock (Percentage of demand during lead time) Demand During Lead Time (DDL)

Number of Cards Necessary for DDL + Earlier stage safety stock Qty(TNKC)

Total Required Inventory (TRI) = DDQ*(TLT+PLT)*NOL

Page 14: Kanban Card Calculator

if IF(TNKC<=3,1,(IF(ROUNDUP(IF(TNKC<=3,1,((PLT+TLT)*DDQ)/KQ),0)+NGC>=TNKC,ROUNDUP(IF(TNKC<=3,1,((PLT+TLT)*DDQ)/KQ),0)-1,ROUNDUP(IF(TNKC<=3,1,((PLT+TLT)*DDQ)/KQ),0)))-NGC)

Page 15: Kanban Card Calculator

IF(TNKC<=3,1,(IF(ROUNDUP(IF(TNKC<=3,1,((PLT+TLT)*DDQ)/KQ),0)+NGC>=TNKC,ROUNDUP(IF(TNKC<=3,1,((PLT+TLT)*DDQ)/KQ),0)-1,ROUNDUP(IF(TNKC<=3,1,((PLT+TLT)*DDQ)/KQ),0)))-NGC)

Page 16: Kanban Card Calculator

IF(TNKC<=3,1,(IF(ROUNDUP(IF(TNKC<=3,1,((PLT+TLT)*DDQ)/KQ),0)+NGC>=TNKC,ROUNDUP(IF(TNKC<=3,1,((PLT+TLT)*DDQ)/KQ),0)-1,ROUNDUP(IF(TNKC<=3,1,((PLT+TLT)*DDQ)/KQ),0)))-NGC)