ScrumSense Cape Town February 2010 Kanban Systems for Software Engineering David J. Anderson Independent Management Consultant [email protected]

Upload: others

Post on 27-Apr-2020

24 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

ScrumSense

Cape Town

February 2010

Kanban Systems for Software Engineering

David J. Anderson

Independent Management Consultant

[email protected]

Page 2: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

http://www.limitedwipsociety.org

Yahoo! Groups: kanbandev

http://www.kanban101.com

Page 3: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

April 21-23, 2010

atlanta2010.leanssc.org

Page 4: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published
Page 5: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Taiichi Ohno…

TPS = JIT + Deming

Kanban is the tool that enables these

Page 6: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published
Page 7: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Kanban is a hot topic in the Agile community

Open Space at Agile 2007 attracted 25 people

Yahoo! Group now has 1050+ members and growing

Implementations at countless companies since August

2007 and on 5 continents

BBC is best known adopter with more than 20 teams in

London using kanban

Other adopters include Software Engineering

Professionals (Indianapolis), BNP Parisbas (London),

IPC Media (London), and Robert Bosch

Corey Ladas published Scrumban, a book about

adding Kanban to Scrum

Henrik Kniberg & Matthias Skarin , Kanban and Scrum

published in Winter/Spring 2010

Davd J. Anderson, Kanban: catalyzing Lean in your

technology organization, due in Spring 2010

Page 8: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Managing with Queues back in 2004

0

20

40

60

80

100

120

140

160

180

200

220

240

Fe

atu

res

Time

Device Management Ike II Cumulative Flow

Inventory Started Designed Coded Complete

WIP

Avg Lead Time

Page 9: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Donald Reinertsen’s Advice

Immediately focus on reducing

waste through improved quality

measured as defects per unit of

valued work

Reduce work in progress

Together these will always have an

immediate impact

Given the groundwork on tracking

and cumulative flow, the elements

are in place to implement a kanban

system

Page 10: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

With Don’s advice I developed myRecipe for Success

Focus on Quality

Reduce Work-in-Progress, Release Often

Balance Demand against Throughput

Prioritize

And for advanced credit…

– Reduce variability and improve the process

Page 11: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

What is a kanban (pull) system?

Page 12: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Definition of Kanban

5 Core Properties

•Limit Work-in-Progress

•Visualize Workflow

•Measure & Optimize Flow

•Make Process Policies Explicit

•Manage Quantitatively

Page 13: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Definition of Kanban (part 2)

5 Emergent Properties

•Prioritize Work by Cost of Delay

•Optimize Value with Classes of Service

•Spread Risk with Capacity Allocation

•Encourage Process Innovation

•Use Models* to Recognize Improvement

Opportunities

Page 14: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Let’s take a break for 15 minutes

Page 15: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Case Study Microsoft 2004/2005

XIT one of Microsoft’s 8 IT departments

XIT Sustained Engineering

Small team

Change requests

Supports over 80 applications (and growing)

Engineering responsibilities moved from Redmond

(Washington, USA) to Hyderabad (India) in 2004

Hyderabad vendor is CMMI Level 5 and uses

TSP/PSP

Initial quality is very high

Page 16: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Dark Days in July 2004

Dev Mgr Test MgrPM

ProductManagers

User Acceptance Test

Backlog 155 Days

ChangeRequests

Demand is outstripping supply and the queue is growing

Manager resigns end June

2004 – open position Q3

2004

Backlog is 80+ and

growing about 20 per

quarter

Lead time is 155 days

Customer satisfaction –

lowest in IT department

Jan-04Apr-04

Jul-04Supply

0

10

20

30

40

50

60

70

80

90

Change Requests

Quarters

Sustained Engineering Supply v Demand

Supply Demand

Page 17: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Estimation (ROM) was Top Priority

Dev Mgr Test MgrPM

ProductManagers

User Acceptance Test

Backlog 155 Days

ChangeRequests

ROM

ROM

Open and Read Source Code

Read Application Guide

Whole process about 1 day per developer and tester

SLA – 48 hours to return a rough order of magnitude estimate (ROM)

All change requests are ROM estimated

ROMs are expedited as top priority due to SLA

3 Developers,3 Testers

But…80 Applications

What happens?...

Estimation was using33%-40%

of available capacity!!!

Page 18: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Estimates were used to facilitate cost accounting

Dev Mgr Test MgrPM

ProductManagers

User Acceptance Test

Backlog 155 Days

ChangeRequests

ROM

ROM

Use ROM x Fixed Rate

per hour to calculate

Cost of Change

Request

Evaluate ROI of

request

( Value/Cost )

Assign costs against

“bucket of funding” from

customer group

$600K*

$200K

$100K

$100K

BudgetFunding

*Numbers are indicative only

Page 19: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Estimates were also used to facilitate monthly rescheduling

Dev Mgr Test MgrPM

ProductManagers

User Acceptance Test

Backlog 155 Days

ChangeRequests

ROM

ROM

Monthly rescheduling

meeting

Assign “urgency” to

each request on

backlog

Reschedule entire

backlog based on

urgency and ROM

estimate

(every month!)

But…

Throughput was

approximately

7 per month

Backlog > 80Rescheduling at least70 requests that cannotbe worked every month

Page 20: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Actual effort was miniscule compared to lead time of 155 days

Dev Mgr Test MgrPM

ProductManagers

User Acceptance Test

Backlog 155 Days

ChangeRequests

ROM

ROM

Historical data gathered over

9 months showed that a

typical change request took

approx 5 business days to

process through

development

Low end was 1 day

High end 15 days

1 to 23 to 5

6 to 1011 to

15> 15

0

5

10

15

20

25

Ch

an

ge

Re

qu

es

ts

Effort in Days

Dev Test

Page 21: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Are Estimates waste?

Dev Mgr Test MgrPM

ProductManagers

User Acceptance Test

Backlog 155 Days

ChangeRequests

ROM

ROM

Only 52% of requests were actually ever completed

Other 48%

Too big(bigger than 15 days)

Too expensive (low value versus cost)

Overtaken by events, application decommissioned before request is processed

ROMs are taking 40% of capacity but 48% of ROMs represent analysis that is never used beyond estimate, schedule and go/no go decision!

Knowledge work is perishable. ROM analysis is done months before work is conducted and there is no guarantee that ROM is conducted by same engineer who will code or test.

Conclusion – all ROMs are waste

Page 22: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Could it get worse? Expediting

Dev Mgr Test MgrPM

ProductManagers

User Acceptance Test

Backlog 155 Days

ChangeRequests

ROM

ROM

PTCNon-code Fix

Production Text Change

E.g. graphical changes, data changes, anything that didn’t require a developer

Must be expedited

Need to make formal QA pass

Page 23: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Backlog Dev Queue

Dev

New

Approved

StartedOn

Hold

Test Queue

Test

StartedOn

Hold

Resolved

Failed

UAT Queue

UAT

Started

Failed,

Scope Changed

Passed

SOX

Production Queue

Complete

Passed

ClosedReleased

Transferred to Proj Team

Pending Future Project

By Design

Duplicate

Won’t Fix

No Repro

New

Analysis

More Info

Info

Received

Abandoned

XIT Change Request

Resolved

(needs

exception)

Re-opened

State Model

WIP limit initially

8 = 3 (dev) + 5 (q)

WIP imit initially

8 = 3 (test) + 5 (q)

Page 24: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Intervention 1Pace the Line from Development

Local Mgr

PM

ProductManagers

User Acceptance Test

Backlog

ChangeRequests

Kanban8 cards(3 WIP

5 Queue)

Kanban8 cards

PTCExpedite

25 Days

Development Kanban Typically enough for WIP + 7 days

Test Kanban Typically enough for WIP + 7 days

Pace line at rate of consumption

At times of high expediting levels, kanban insures that line is paced from Test not Dev

Reduces lead time by insuring single-tasking

Focuses customer acutely on selection of highest priority (urgency) requests for insertion into empty buffer slots

Page 25: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Intervention 2 – Stop Estimating

Local Mgr

PM

ProductManagers

User Acceptance Test

Backlog

ChangeRequests

Kanban8 cards(3 WIP

5 Queue)

Kanban8 cards

25 Days

Stop cost accounting

No such thing as a cost of change request

Costs are fixed

Funding is spent with vendor on 12 month contract and paid out on

monthly burn rate

All changes would be treated equally for cost purposes

Based on average of 5 business days through development

PTCExpedite

ROM activity abandoned

Freed up 40% capacity

Instant boost to productivity

numbers

Edge cases

Too big (take risk, identify once

in development)

Too expensive (don’t care)

Following Deming’s advice –

manage for the normal and treat

exceptions as exceptional

Page 26: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Intervention 3 - Balancing the Line

Local Mgr

PM

ProductManagers

User Acceptance Test

Backlog

ChangeRequests

Kanban8 cards

25 Days

PTCExpedite

Kanban9 cards(4 WIP

5 Queue)

Kanban system and eradication of estimation should introduce

slack in test

Historical data suggested ratio of dev:test is 2:1 but XIT SE has 1:1

ratio (July 2004)

Visited India to observe team after first two interventions

Confirmed belief that test was not fully utilized

Ask vendor to reallocate resource from test to dev to 4:2

Note: Change to kanban size for Dev

Instant improvement in productivity (36 to 45) – 25%

Page 27: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Intervention 4 - Invest for Yet More Throughput

Local Mgr

PM

ProductManagers

User Acceptance Test

Backlog

ChangeRequests

Kanban8 cards

25 Days

PTCExpedite

Kanban11 cards(5 WIP

6 Buffer)

Kanban9 cards(4 WIP

5 Buffer)

Having eliminated waste and balanced the production process

Removed ROM estimate waste

Removed slack from test

And changed policies that were causing muda to occur

Ceased cost accounting

removed ROM estimate waste

Re-wrote SLAs with customer

Changed prioritization and delayed commitment

Total Improvement of 155% in productivity, but more was needed…

Increase staff to 5:3 dev:test ratio in July 2005

Maintains balance in line

gains a total 217% productivity improvement since July 2004

Note further adjustment to kanban limit

Page 28: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Zero Backlog – Nov 22nd 2005

After 12 months team hits zero backlog of

change requests

November 2004 – backlog is 80 and trending

upwards

A combination of falling demand and 200%

productivity improvement meant supply was

greater than demand and the backlog was

depleted

Team wins XIT Team Excellence Award for

H2 2005

Page 29: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Throughput

Sep-04Dec-04

Mar-05Jun-05

Sep-05Dec-05

0

10

20

30

40

50

60

45

56

17

and Cost

45

Zero Backlog achieved

Some idle timeLowers metrics

$7500

$2900$3300

Lowest cost

Highest

Productivity

per person

Shortest lead time

Highest customer

satisfaction

Page 30: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Productivity (per resource)

Ma

r-0

4

Ma

y-0

4

Ju

l-0

4

Se

p-0

4

No

v-0

4

Ja

n-0

5

Ma

r-0

5

Ma

y-0

5

Ju

l-0

5

Se

p-0

5

No

v-0

5

Dev

0

5

10

15

20

25

Ch

an

ge

Re

qu

es

ts

Quarters

Productivity per Resource

Dev Test

5

12

23

Zero Backlog achieved

Some idle timeLowers metrics

9

15

Page 31: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Why Lead Time is the best metric

XIT-SE TTR

From 5 Months To 3 Weeks in 5 Quarters

0

20

40

60

80

100

120

140

160

180

FY04 Q4 FY05 Q1 FY05 Q2 FY05 Q3 FY05 Q4 FY06 Q1 FY06 Q2

Quarter

Ca

len

da

r D

ay

s

Other Sev TTR

Sev 1• New Manager

• No More ROMs

• New Prioritization

Process

• Flow Management

Changed dev : test ratio

from 3:3 to 4:2

Increased dev : test from

4:2 to 5:3

Lowest cost

Highest

Productivity

per person

Shortest lead time

Highest customer

satisfaction

Zero Backlog

Page 32: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Let’s take lunch

Page 33: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Kanban board and daily standup meeting were introduced in early February 2007 to add a sense of urgency and

team collaboration

More personal responsibility and accountability

Resulted in better visual control

Enabled more self-organization

Less management supervision

Better productivity

Spontaneous quality circles and frequent Kaizen events

Page 34: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

WIP limits create a kanban pull system &a white board provides visualization of flow

Pull

Flow – from Engineering

Ready to Release Ready

WIP Limit – regulates

work at each stage in

the process

Page 35: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Kanban board design

Input

Queue

Dev

Ready In Prog Done

Build

ReadyTest Release

ReadyStage Prod.

DoneIn Prog

5 4 43 2 2

Courtesy Olav Maassen QNH

DevelopmentAnalysis

Page 36: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Kanban board simulation

5 4 43 2 2

Flow

Courtesy Olav Maassen QNH

Input

Queue

Dev

Ready In Prog Done

Build

Ready

Test Release

Ready

Stage Prod.DoneIn Prog

DevelopmentAnalysis

Page 37: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

… or use one of the many electronic kanban tools now on the market

Agile Zen

LeanKit Kanban

Silver Catalyst

Target Process

RadTrack

Flow.io

Kanbanery

Jira + Greenhopper v4.0

FogBugz + Plugin

VersionOne

Rally(?)

Mingle (??)

Page 38: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Sticky Buddy scheme was instituted to allow remote workers to keep kanban board up-to-date and

synchronized with electronic tracking

Page 39: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Exercise 1 – Value-stream Modeling

Take 15 minutes

Split the room into small groups (approx 5 people per group)

Collaborate

Pick someone in the group. Ask them to describe a workflow from their organization and map the value-stream

Create a kanban board to map and track the value-stream

Ask Questions – you don’t know everything you need to know to complete the exercise! For example, how to model concurrency

of tasks?

Page 40: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Define Work Item Types

Change Requests and

Production Bugs – Customer

valued and prioritized by

governing board

Page 41: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

De-lineate non customer-valued work

Engineering Defects – direct

indicator of quality impact on

productivity, linked to yellow

sticky, not counted against

kanban limit

Page 42: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Reserve capacity for essential maintenance & upgrades

IT Maintenance Work –

Technology department reserving

capacity for its own maintenance

– difficult to prioritize with

business – count against kanban

limits

Page 43: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Work Item Types

Types can be derived based on…

Source

E.g. Regulatory Requirement, Field Sales Request,

Strategic Planning Feature

Workflow

Items that flow through different steps (or in a

different sequence) should be different types, tracked

on same board

Size

Order of magnitude

T-shirt sizes

Page 44: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Use swim lanes to lineate type & allocate capacity across lanes

5 4 43 2 2

Adapted from design courtesy Olav Maassen QNH

= 20 total

...

Change Req

12

Maintenance

2

Production Defect

6

Allocation

Total = 20Input

Queue

Dev

Ready In Prog Done

Build

Ready Test

Release

ReadyDoneIn Prog

DevelopmentAnalysis

Page 45: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Exercise 2 – Work Item Type Definition

Take 15 minutes

Same groups as before

Collaborate

Define a set of work item types that flow through the value-stream defined in exercise 1

Decide how to visually communicate work item type for each item in the system

Ask Questions – you don’t know everything you need to know to complete the exercise! For example, how to model hierarchical

work item types?

Page 46: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Classes of Service

Change Requests and

Production Bugs – Customer

valued and prioritized by

governing board

Page 47: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Expediting – the Silver Bullet

Process allows for a single Silver

Bullet expedite request

Silver bullet is hand carried through

the system

Personal attention from project

manager

Automatically jumps queues

Required specialist resources drop

other work in preference to working

the silver bullet

Release dates may be adjusted to

accommodate required delivery date

Page 48: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Fixed delivery dates are allowed but not encouraged

There are strict rules for date

dependent work items

E.g. date constrained by legal

commitment with customer or supplier,

or regulatory requirement (typically in

financial systems)

Generally, delivery dates are not

allowed

Page 49: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Temporary classes of work may be introduced tactically to maximize exploitation of the system

Extra Bug – Special class of

production bug, worked by slack

developer resources and

specially selected not to impact

solutions analysis. Tested by

developers not testers. Allows

maximum exploitation for

improved throughput

Page 50: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Generally speaking class of service should be defined according to

cost of delay function

Cost of delay function for an online Easter holiday marketing

promotion is difference in integral under two curves

Page 51: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Example classes of service

Expedite

Fixed Delivery Date

Unit step cost of delay function (or near

approximation)

Standard Class

Linear tangible cost of delay function

Intangible Class

Intangible cost of delay

Examples brand identity change, usability fix

Page 52: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Policies for Expedite Class of Service

Expedite requests will be shown with white colored

cards.

Only one expedite request will be permitted at any

given time. In other words, a kanban limit of 1 is

assigned to the Expedite class of service.

Expedite requests will be pulled immediately by a

qualified resource. Other work will be put on-hold

to process the expedite request.

The kanban limit at any point in the workflow may

be exceeded in order to accommodate the

expedite request.

If necessary a special (off-cycle) release will be

planned to put the expedite request in production

as early as possible.

Page 53: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Policies for Fixed Date Class of Service

Fixed delivery date items will use purple colored cards.

The required delivery date will be displayed on the bottom right hand

corner of the card.

Fixed delivery dates will receive some analysis and an estimate of

size and effort may be made to assess the flow time. If the item is

large it may be broken up into smaller items. Each smaller item will

be assessed independently to see whether it qualifies as a fixed

delivery date item.

Fixed delivery date items will be held in the backlog until close to the

point where they must enter the system in order to be delivered on-

time given the flow time estimate.

Fixed delivery date items will be given priority of selection for the

input queue at the appropriate time.

Fixed delivery date items will be pulled in preference to other less

risky items. In this example, the will be pulled in preference to

everything except expedite requests.

Unlike expedite requests, fixed delivery date items will not involve

putting other work aside or exceeding the kanban limit.

If a fixed delivery date items gets behind and release on the desired

date becomes less likely it may be promoted in class of service to an

expedite request.

Page 54: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Policies for Standard Class of Service

Standard class items will use yellow colored cards

Standard class items will be prioritized into the input queue

based on an agreed mechanism such as democratic voting

and will typically be selected based on their cost of delay or

business value

Standard class items will use First in, First out (FIFO)

queuing approach to prioritize their pull through the system.

Typically when given an option a team member will pull the

oldest standard class item from an available set of standard

class items ready for the next step in the process

Standard class items will queue for release when they are

complete and ready for release. They will be released in the

next scheduled release

No estimation will be performed to determine a level of effort

or flow time.

Standard class items may be analyzed for size. Large items

may be broken down into smaller items. Each item may be

queued and flowed separately

Page 55: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Policies for Intangible Class of Service

Intangible class items will use green colored cards.

Intangible class items will be prioritized into the input queue based

on an agreed mechanism such as democratic voting and will typically

be selected based on their intangible business value.

Intangible class items will be pulled through the system in an ad hoc

fashion. Team members may choose to pull an intangible class item

regardless of its entry date so long as a higher class item is not

available as a preference.

Intangible class items will queue for release when they are complete

and ready for release. They will be released in the next scheduled

release.

No estimation will be performed to determine a level of effort or flow

time.

Intangible class items may be analyzed for size. Large items may be

broken down into smaller items. Each item may be queued and

flowed separately.

Typically, the preference would be to put aside an intangible class

item in order to process an expedite request.

It is therefore sensible and shows a good spread of risk when

intangible class items are flowing through the system.

Page 56: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Use Color to de-lineate class of service and allocate capacity across classes to manage risk

5 4 43 2 2

Adapted from design courtesy Olav Maassen QNH

= 20 total

Allocation

10 = 50%

...

1 = 5%

4 = 20%

6 = 30%

Input

Queue

Dev

Ready In Prog DoneDoneIn Prog

DevelopmentAnalysis Build

Ready Test

Release

Ready

Page 57: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Exercise 3 – Classes of service

Take 15 minutes

Same groups as before

Discuss the different classes of service that might apply

Draw some example cost of delay curves

Show how cost of delay is driving your choice of classes of service

Define policies for processing each classes of service

Decide how to visually communicate classes of service note that class of service should be

unambiguous from work item type

Page 58: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Kanban tickets hold a lot of information that enable decentralized control and local decision

making when deciding priority of items to pull through the system

Electronic ID number

Date Accepted – clock

starts on SLA

Signifies item that has exceeded

SLA – indicates that item should be

prioritized if possible

Hard delivery date –

for regulatory, legal, or

strategic reasons

Issue attached to

change request –

indicates management

attention required

Assigned engineer

Page 59: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Exercise 4 – Design Work Item Tracking Card

Take 15 minutes

Same groups as before

Collaborate

Design the layout of a kanban wall card

What information will you and the team need in order to adequately self-organize and flow work through the system

Ask Questions – you don’t know everything you need to know to complete the exercise! For example, how will pull prioritization

be decided?

Page 60: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

WIP limits should be set based on policies and empirically adjusted up/down over time

WIP Limit – defined

via policies

tuned to organizational

maturity

Page 61: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Examples of WIP Limit Policies

Each person should work on no more than 2

items at a time

Hence, limit = number of people x 2

Prioritization cadence and coordination

meeting will be once per week

Hence, input queue must be large enough for one

week of pull

Mathematically, input queue should be 3 sigma

upper control limit of mean throughput (rate of pull)

Page 62: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

General Observations about Kanban Limits

Lower limits are better

Less work-in-progress (WIP)

Lower cycle times

More agile

More value delivery

Tight lower limits inflict pain on the

organization

Tight limits will cause work to stall (no flow)

Requires good skill in issue management &

resolution (impediment removal)

Requires capability in root cause analysis and

resolution

Lower maturity organizations should have

looser limits

Higher maturity organizations tighter limits

Page 63: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Kanban limits can be grouped across work columns and queues (or buffers)

Kanban Limit – of 4

for analysis and

analysis complete

queue

Kanban Limit – similar

policy for development

and development

complete

Page 64: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Exercise 5 – Setting Kanban Limits

Take 15 minutes

Same groups as before

Collaborate

Discuss policies for queues

Discuss policies for work columns

Discuss organizational maturity

Set limits according to agreed policies and maturity

Ask Questions – you don’t know everything you need to know to complete the exercise! For example, would separating out

different sizes of work item, allow us to reduce queue sizes?

Page 65: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Scaling Kanban

Page 66: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Major Project with two-tiered kanban board using swim lanes for feature sets

Swim lanes control WIP limit –

Requirement WIP (green)

controlled by number of lanes

Page 67: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Small generalist team assigned to each swim lane responsible for feature breakdown and flow

Feature Team – names of team

members assigned to swim lane

Page 68: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Cross-functional resources are shown with small orange tickets attached to features

Shared resources – e.g.

enterprise data architect

Page 69: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Handling Cross-team Dependency

Tag Work Items with Shared

Resource Dependency Clearly mark as impeded

Provides visibility onto the problem

Provide shared resource with separate

Kanban board/system Allow several sources of dependency to compete

for scarce resource

Treat Integration Items as Fixed Date class of

service

Base fixed date on agreed integration point

Page 70: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

End of Day 1 Retrospective

Take 5 minutes

From today’s tutorial, what have you learned?

What questions do you have for tomorrow?

Where do you believe Kanban would be useful?

In what situations might Kanban be inappropriate or sub-optimal to implement? Why?

Page 71: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Models(to identify improvement

opportunities)

Page 72: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

3 Sources of Improvement

Manage Bottlenecks

(improve flow, deliver more value)

Improve Economic Costs

(reduce waste/overheads)

Reduce Variability

(Chance & Assignable Cause)

Page 73: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Economic Costs(waste identification)

Page 74: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

What is efficiency?

Page 75: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

What’s the most efficient way to paint a fence?

Page 76: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Focusing on efficiency produces better cost accounting results for large batch sizes

Task Wait

CleanupSetup

Q

Time

Task WaitQueue

Task WaitQueue

Task WQueue

Page 77: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Because the transaction costs (in this case, the setup and cleanup)

can be amortizedover a greater number of value items

(in this case, painted sections of fence)

Page 78: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

But there are also coordination costs in knowledge work problems

Task Wait

CleanupSetup

Q

Time

Task WaitQueue

Task WaitQueue

Task WQueue

Communication

Page 79: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

And in knowledge work problems, coordination costs grow non-linearly with batch size

Task Wait

CleanupSetup

Q

Time

Task WaitQueue

Task WaitQueue

Task WQueue

Communication

Page 80: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

The prevailing paradigm in Western management was that overheads

(transaction and coordination costs) were inevitable and efficiency was

achieved through economies of scale(i.e. large batch sizes)

Page 81: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Sources of Waste

Transaction Costs

Coordination Costs

Failure Load

Page 82: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Waste is Waste

Thinking of startup,

coordination and delivery

tasks as “waste” is

perplexing for most

knowledge workers. Call

them “costs” instead

Page 83: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Value-added Work

Tra

nsacti

on

Co

sts

Coordination Costs

Failure LoadTra

nsacti

on

Co

sts

time

co

st

Page 84: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Good

Bad

Page 85: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Sources of Economic Costs

Transaction Costs

Coordination Costs

Failure Load

Page 86: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Exercise 6 – Cadence

Take 15 minutes

What’s the correct release cadence for your kanban system?

What are the transaction costs of a release? (training, deployment, governance) and the lead times involved (e.g. training lead time)?

What is the appropriate input / prioritization cadence?

How quickly are things changing? (in the business)

If you reduce waste how might this affect cadence?

Does it make sense for release cadence and prioritization to be the same?

Page 87: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Exercise 7 – Economic Cost Identification

Take 15 minutes

Same groups

Identify transaction costs in your project work

Identify coordination costs

How much of the total effort on projects, do you estimate is transaction or coordination costs (rather than value-added) effort?

Estimate Failure load – internal (bugs) and external (escaped) sources

Draw a sketch of economic cost model based on data

Page 88: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Focus on Quality(Reduce Failure Load)

Page 89: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Too much WIP increases defect rates in a non-linear fashion

Page 90: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Defects have an opportunity cost

Blue tickets are defects –defects increase WIP, reduce the team’s ability to work on valuable new features and lengthen lead time

Page 91: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Quantity of blue tickets on the board is an immediate indicator of development quality that is

impeding flow of customer valued work and reducing throughput

Engineering Defects – direct

indicator of quality impact on

productivity

Page 92: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Defects have an opportunity cost

In turn defects increase WIP, lengthen lead

times and may result in yet more defects

Page 93: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Track WIP!WIP is directly related to Lead Time and Quality

Device Management Ike II Cumulative Flow

0

20

40

60

80

100

120

140

160

180

200

220

240

10-F

eb

17-F

eb

24-F

eb

2-M

ar

9-M

ar

16-M

ar

23-M

ar

30-M

ar

Time

Fe

atu

res

Inventory Started Designed Coded Complete

WIP

Lead Time

Page 94: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Too much WIP, 3 month lead time led to a 30x reduction in quality compared to 1 week

lead time

Project B Cumulative Flow

0

25

50

75

100

125

150

175

9-O

ct

23-O

ct

6-N

ov

20-N

ov

4-D

ec

18-D

ec

1-J

an

15-J

an

29-J

an

12-F

eb

26-F

eb

11-M

ar

Time

Fe

atu

res

Inventory Started Designed Coded Complete

Lead Time

Page 95: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Defects have an opportunity cost

In turn defects increase WIP, lengthen lead

times and may result in yet more defects

Too much WIP increases complexity and

adds additional communication overhead

Page 96: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Defects have an opportunity cost

In turn defects increase WIP, lengthen lead

times and may result in yet more defects

Too much WIP increases complexity and

adds additional communication overhead

By far the easiest way to increase throughput and

reduce lead time is to focus on quality

Page 97: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Focus on Quality

• Measure, Track and Manage WIP

• Employ policies to minimize defects– Design and Code reviews

– Static and Dynamic Code Analysis

– Test-first development

– Automated unit tests

– Continuous integration

– Formal system testing by professional testers

– Develop and test in small batches

– Provide developers with defect feedback as early

as possible and as often as possible

– Enforce as much quality discipline with your

configuration management tool as possible

• E.g. no check-in without passing unit tests

Page 98: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Exercise 10 – Policies for Quality

Take 15 minutes

What policies might you set to positively affect quality?

How will these policies affect workflow?

Will kanban limits have to be adjusted?

Which policies might be overridden when required?

Can quality policies be related to classes of service?

Ask Questions – you don’t know everything you need to know! For example, how should defects be

handled in the workflow?

Page 99: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Manage Bottlenecks

Page 100: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Manage bottlenecks to increase productivity

1. Identify - Current CCR is System Test – 30 per month2. Exploit - Testers relieved of all non-essential tasks, extra

PMs assigned to complete administrative tasks, analysts assigned to future test plans

3. Subordinate - Requirements release restricted to ~30 per month

4. Elevate - Plan to recruit temporary testing staff immediately

Idea Analysis Design Code

Unit

Test

System

Test

Acceptance

Test

Working

Code

ErrorErrorError

~90 ~80 ~50 ~50

~80 ~30 ~50

Schedule

Quality

Schedule

Quality

~40How do I trim 25% off the schedule for

a project going through this system?

Known max productivity

Page 101: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Iteration 1 Burndown

Page 102: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Iteration 1 Cumulative Flow

Page 103: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Burndownversus Cumulative Flow Comparison

Page 104: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Cumulative Flow

CR Only CR, Bugs and PDUs

WIP growth due to additional

resource allocation (good) and

some sloppy management of

kanban limits (bad)

Business

encouraged to

re-triage backlog

Page 105: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Non-instant Availability

Looks like a bottleneck

Same thinking process applies

Management approach is similar but policies

will be different depending on type of

bottleneck CCR vs NIA

Page 106: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Exercise 6 – Bottleneck Management

• Take 15 minutes

• Same groups as before

• Where do you think there are bottlenecks in your workflow?

• Is it a CCR or an NIA type bottleneck?

• What actions would you take to maximize the utilization of your bottleneck resource?

• What policies are required to subordinate everything else to your exploitation decision?

– What policies would you remove or change?

– What new policies must you introduce?

Page 107: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Understanding Variability

Page 108: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

How do event planners do it?

Scheduling Wimbledon isn’t an exact science

Games last different lengths of time and weather conditions can stop play altogether but the Men’s

Final always happens on the 2nd Sunday

If only we could project manage like this!

Wimbledon comes in on time every year

Except 2004 when it rained on Sunday and

the final was on Monday ;-)

Page 109: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Where is the constraint now?

1. Variability – variation in Design, Code or Unit Test can move the constraint

2. Plan Insecure – Plan based on System Test as CCR is insecure

3. Reduce Variability – Change methods in Design, Code & System Test to reduce variability

4. CCR has Narrowest Variability – System Test as CCR should have narrowest variability

Idea Analysis Design Code

UnitTest

SystemTest

AcceptanceTest

WorkingCode

ErrorErrorError

~90+-10 ~80+-20 ~50+-10 ~50+-10

~80+-10 ~40+-15 ~50+-5~40+-5

~50+-5 ~50+-5

Page 110: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Quantity of pink issue tickets on board directly indicates flow impacting problems that need

attention from management

Issues are the exception –

attached to work items that are

blocked for external reasons and

call attention to problems

preventing smooth flow

Page 111: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Issue Management Cumulative Flow

Page 112: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Exercise 7 – Classifying Variability

Take 15 minutes

Same groups as before

List the policies under your control that affect the time taken to complete value-added work e.g. Code Inspections, Customer

Review

What levers can you pull and how might they affect risk? e.g. removing code inspections

List typical events out of your control that randomize your plans and schedules

What actions might you take to mitigate the effects of these external events Can classes of service be used to help

with risk mitigation?

Page 113: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Kaizen Culture

Page 114: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Map the value stream and track work on a white board

Hold a standup meeting every day in front of the board

Page 115: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

… or create an application that looks like a whiteboard but provides the archival advantage of an electronic

system

Page 116: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Kanban uses a daily standup meeting as a central enabler of a Kaizen

culture

In this example more than 40 people

attend a standup for a large project

with 6 concurrent development

teams. The meeting is usually

completed in approximately 10

minutes. Never more than 15.

Page 117: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Manage quantitatively and objectively using only a few simple metrics

• Quality

• WIP (work-in-progress)

• Lead time (against target and DDP)

• Issue & Blocked Work

• Throughput

• Cycle Time Efficiency

Across these:

Trend

Variation

Page 118: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Hold a monthly Operations Review and present all the data, invite anyone

who wants to come

Page 119: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Kanban sets an expectation of High Maturity

Root cause analysis on

defects

“stop the line”

CAR

Kaizen events

OID

Page 120: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Educate the workforce to recognize process problems that

affect performance

Page 121: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Look how the board has changed by March! Empirically adjusted Kanban limits reacting to

industrial engineering issues. Much neater presentation – pride in the process is forming

Page 122: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

And again in April, more changes to Kanban limits and forward extension of the process to business analysis

Page 123: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Waste bin spontaneously introduced by team to visually communicate rejected CRs that wasted energy and

sucked productivity

Page 124: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

A report was created to detail rejected or cancelled work items (muda)

Page 125: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Kanban has allowed us to observe known industrial engineering issues

Expediting impacts throughput and lead time

Tends to increase WIP

Overly large CRs cause ragged flow, blow out lead time

Larger variation in CR size has required larger queues and buffers – extending lead time

Non-constraints exhibit ragged flow behavior due to non-instant availability

e.g. integration build

Bottlenecks create ragged flow (e.g. Test) but also experience idle time from upstream ragged flow from non-instant availability stations (e.g. Build)

Big items are now broken up, temporarily breaks the Kanban limit but pull system means no new items enter WIP until overflow is depleted. Result is smoother flow even with big items

Page 126: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Spontaneous Quality Circles started forming

Kanban board gives visibility into process issues –ragged flow, transaction costs of releases or transfers through stages in process, bottlenecks

Daily standup provides forum for spontaneous association to attack process issues affecting productivity and lead time

For example, 3 day freeze on test environment was a transaction cost on release that caused a bottleneck at “build” state. This was reduced to 24 hours after a 3 person quality circle formed to investigate the policies behind the freeze. Result was improved smooth flow resulting in higher throughput and shorter lead time

Page 127: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Other spontaneous quality circle kaizen events

Empirically adjusted kanban limits several times E.g. test kanban too small, causing ragged flow

UAT state added Prompted by test who were experiencing slack time

Expanded kanban limit on Build Ready state, added Test Ready state Introduced to smooth flow post release due to

environment outage transaction cost

Introduced kanban board, daily standup, colored post-it notes for different classes of service, notations on the post-its

Poor requirements causing downstream waste resulted in an upstream inspection to eliminate issues with poorly specified requests

Page 128: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

In general, empirical observation of ragged flow or visibility of waste generates a quality circle resulting in a

kaizen event

Page 129: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

September 2007 – Business Analysis and Systems Analysis merged eliminating 25% of lead time consumed

as queuing waste

Page 130: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

And the process spread inside Corbis …

Page 131: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

And externally at companies like Yahoo! …

Page 132: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

… this one on the Mash social network team

Page 133: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

And the technique is being introduced to major projects with much longer time horizons. This example has a

monthly “integration event” rather than a release every two weeks

Page 134: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

5 months later significant changes are evident

Page 135: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Major project with two-tiered kanban board

Page 136: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Major Project with two-tiered kanban board using swim lanes for feature sets

Page 137: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Less mature major project in trouble adopts kanban to bring a focus to daily routine and visibility to work-in-

progress to team and management

Page 138: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Next Day – Team is maturing quickly and has refactored the board with swim lanes for functional areas

Page 139: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

More and more reports were demanded to facilitate management decisions. In this case, new reports to

facilitate weekly prioritization

Page 140: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Completed items are collected on the wall to the right hand side of the board. Visual indicator of cumulative total

of value delivered

Management instituted

a “bottle tops” saving

scheme where

completed items are

“traded” against morale

events to celebrate

success

E.g. movie tickets,

bowling evening, trip

to Gameworks

Page 141: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Executive Dashboard

Page 142: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Mean Lead Time Trend

Mean Lead Time Trend

0.0

10.0

20.0

30.0

40.0

50.0

60.0

Dec Jan Feb Mar Apr May

Da

ys CRs

Bugs

Combo

SLA

Page 143: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Due Date Performance Detail

Lead Time Distribution

0

0.5

1

1.5

2

2.51 6

11

16

21

26

31

36

41

46

51

56

61

66

71

76

81

86

91

96

101

106

Days

# C

Rs

MARCH

Lead Time Distribution

0

0.5

1

1.5

2

2.5

3

3.5

1 8 15 22 29 36 43 50 57 64 71 78 85 92 99106

113120

127134

141148

Days

CR

s &

Bug

s

APRIL

Outliers

Majority of CRs range 30 -> 55

Page 144: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Exercise 12 – Metrics

Take 15 minutes

What metrics would you track?

Who is the audience for the metrics?

Can you identify day-to-day (leading indicator) metrics used for management intervention?

Versus weekly, monthly, quarterly (lagging indicator) metrics used for executive reporting, customer satisfaction and assessment of continuous improvement?

Page 145: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Summary

Culture Change Trust, empowerment, objective data measurement,

collaborative team working and focus on quality

Policy Changes Late-binding release scope, no estimating, late-

binding prioritization

Cycle time, Release Cadence and Prioritization Cadence are decoupled

Cross-functional collaboration Previously unheard of VP level selfless

collaboration on business priority

Self-regulating process robust to gaming and abuse

Continuous Improvement Increased throughput, high quality, process

continually evolving, kanban limits empirically adjusted

Page 146: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

And finally, staff take a pride in their achievements

Page 147: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Day 2 Retrospective – What will you change?

Take 5 minutes

What have you learned today?

What one thing will you implement as a change in your organization when you get back to the office this week?

How far do you think Lean/Kanban can take your organization?

Take 5 minutes to discuss your results and share with the group

Page 148: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

Thank you!

[email protected]

http://www.agilemanagement.net/

Page 149: Kanban Systems for Software Engineering - Scrum …scrumsense.com/wp-content/uploads/2010/02/...adding Kanban to Scrum Henrik Kniberg & Matthias Skarin , Kanban and Scrum published

Ma

na

ge

me

nt C

on

su

lting

for K

no

wle

dg

e W

ork

ers

Da

vid

J. A

nd

ers

on

& A

ss

oc

iate

sK

anb

an

2010

About…David Anderson is a thought leader in managing effective software teams. He leads a consulting firm dedicated to improving economic performance of knowledge worker businesses – improving agility, reducing cycle times, improving productivity and efficiency in technology development.

He has 25+ years experience in the software industry starting with computer games in the early 1980’s. He has led software teams delivering superior productivity and quality using innovative agile methods. He developed MSF for CMMI Process Improvement for Microsoft. He is a co-author of the SEI Technical Note, CMMI and Agile: Why not embrace both!

David’s book, Agile Management for Software Engineering – Applying the Theory of Constraints for Business Results, introduced many ideas from Lean and Theory of Constraints into software engineering.

David was a founder of the Lean Software & Systems Consortium, a not for profit dedicated to promoting better standards of professionalism and effectiveness in software engineering. Email… [email protected]