KANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt. q ov. i n EG^//l(4751 (ECy(cRZ) 3 t0 To, Dr. Ranjini Warrier, Director (IA-III Division) Ministry of Environment, Forests & Cllmate Change, Government of India, Indira Paryavaran Bhavan, 2nd Floor,Vayu Wing, Jor Bagh Road, Aliganj. New Delhi - 11O OO3. sub: Developing Integrated Facilities within existing Kandla Port at Kandla - - EnvironmLntalTcnZ Clearance reg. (MoEF&CC, GoI File No' 11- 82l2011-rA-rrr). Ref.: 1) KPT letter no. EGIWK/47,L(EC)/Part III/973 dated Fl11/2ot1- Application for finalization of TOR. 2) TOR issued by MoEF,GoI vide letter dated 22/5/20L2' :j r<er letter no. EG/WK/47st(EC)/part IV (P.H.)/258 dated 19/4/2014' _ Submission of Final EIA Report to MoEF,GoI for Environmental/CRZ Clearance reg. 4) Minutes of the EAC Meeting held on 3U7/2014 - Item No' 3'21' S ir, Kindly refer above cited references for the said subject. In this connection, it is to state that, Kandla Port vide above referred letter dated tg/4/2014 (within validity period of ToR) had submitted Final EIA Report (after Public consultation) to the MoEF,GoI for obtaining EnvironmentaI/CRZ Clearance. In response, MoEF,Goi had included the proposal in Expert Appraisal committee Meeting held on 3t/7/2oL4 (Item No. 3.21) for appraisal. During the meeting, Expert Appraisal Committee asked Kandla Port Trust to submit the certain information as mentioned in the Minutes of EAC Meeting held on 3L/7 /2014 (Annexure A). Daled:ZUt6t2015 a, o(b

Upload: others

Post on 13-Jul-2020

16 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

KANDLA PORT TRUST

Administrative Office Building

Post Box NO. 50

GANDHIDHAM (Kutch).Gujarat: 370 201.Fax: (02836) 220050Ph.: (02836) 233192

wmar. ka nd la po rt. q ov. i n

EG^//l(4751 (ECy(cRZ) 3 t0To,Dr. Ranjini Warrier, Director (IA-III Division)Ministry of Environment, Forests & Cllmate Change,Government of India,Indira Paryavaran Bhavan, 2nd Floor,Vayu Wing,Jor Bagh Road, Aliganj.New Delhi - 11O OO3.

sub: Developing Integrated Facilities within existing Kandla Port at Kandla -

- EnvironmLntalTcnZ Clearance reg. (MoEF&CC, GoI File No' 11-82l2011-rA-rrr).

Ref.: 1) KPT letter no. EGIWK/47,L(EC)/Part III/973 dated Fl11/2ot1-Application for finalization of TOR.

2) TOR issued by MoEF,GoI vide letter dated 22/5/20L2':j r<er letter no. EG/WK/47st(EC)/part IV (P.H.)/258 dated 19/4/2014'

_ Submission of Final EIA Report to MoEF,GoI for Environmental/CRZClearance reg.

4) Minutes of the EAC Meeting held on 3U7/2014 - Item No' 3'21'

S ir,

Kindly refer above cited references for the said subject.

In this connection, it is to state that, Kandla Port vide above referred letter

dated tg/4/2014 (within validity period of ToR) had submitted Final EIA Report

(after Public consultation) to the MoEF,GoI for obtaining EnvironmentaI/CRZ

Clearance.

In response, MoEF,Goi had included the proposal in Expert Appraisal

committee Meeting held on 3t/7/2oL4 (Item No. 3.21) for appraisal. During

the meeting, Expert Appraisal Committee asked Kandla Port Trust to submit the

certain information as mentioned in the Minutes of EAC Meeting held on

3L/7 /2014 (Annexure A).

Daled:ZUt6t2015a,o(b

Page 2: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

The ooint wise information is mentioned as under:

(i)Submit copy of the recommendations of Guiarat CZMA,.

Kandla Port Trust had submitted the application for obtaining CRZ

Recommendations dated lL/t1l2}l3 to the Additional Secretary & Director(Environment), Forest & Environment Department, GoG. In response, Gujarat

coastat Zone Management Authority in its meeting held on to/4l2ol5 has

recommended seven projects out of total 13 projects to MoEF&CC,GoI (Copy ofMinutes of 25th GczMA Meeting held on to/4/2015- Annexure B)'However, formal cRZ recommendation letter is still awaited. As soon as

we receive/ the formal recommendation letter, the same will be submitted to

MoEF&CC,GoI immediately.

The Integrated future projects for which Environmental/cRZ clearance is

required, are monitored by Ministry of Shipping, GoI constantly. Hence, it would

be necessary to implement the said p roje'cts as per the target dates fixed by the

MoS,GoI. Further, for the project of "Development of oil Jetty to 'handle liquid

cargo & ship bunkering facilities at old Kandla on BoT basis", KPT had already

signed concession agreement with successful bidder & obtaining

Environment/CRZ Clearance is the responsibility of Kandla Port Trust as per the

provisions of the signed concession agreement.

considering above submission, it is requested to kindly consider our subjectproposal in ensuing Expert Committee Meeting to be held in the month of July,

2015 please.

(ii) submit detailed /proper response on the issues raised duringpublic Hearing.

A copy of the detailed/proper response on the issues raised dirring Public

Hearing is enclosed as AE!!gUle..]c.

(iii) Compliance of ToR conditions with legible maps and details'

A copy of compliances of ToR conditions with legible maps & details is

placed as Annexure D.

(iv)SubmitthedetailsofcompliancewithearlierECconditions.

A copy of details of compliances with earlier EC Conditions is enclosed as

Annexure E.

Page 3: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

In view of the above compliances, it is requested to kindly consider oursubject proposal in the ensuing Expert committee Meeting to be held in theMonth of July, 2015 for grant of Environmental/CRZ Clearance , so that projects

can be implemented by KPT as per the target dates fixed by the Ministry ofShipping, GoI.

Thanking you.

Encl: as above

Your's Faithfully,

*

Kandla Port

Page 4: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

existing Kandla Port at Kandla, Gujarat by M/s Kandla Port Trust. [F.No.11-

82/2011-IA.III]

As presented by the PP, the proposal is for “Developing Integrated Facilities within existing Kandla Port at Kandla” in the State of Gujarat. The proposed projects involves development of barge jetty of 6.57 MMTPA at Tuna (500mx12m), development of oil jetty to handle liquid cargo and Ship bunkering terminal of 3.39 MMTPA at Old Kandla (300mx15m) and 450mx10m approach, development of barge jetty of 8.57 MMTPA at Khori Creek, Kandla Port (1000m x 12m), up-gradation of barge handling capacity at Bunder Basin at Kandla, providing Railway Line from NH 8A to Tuna Port (12km), multipurpose cargo terminal of 9.08 MMTPA at Tekra off Tuna (600mx80m) Stage–II, construction of Rail Over Bridge at NH-8A near Nakti Bridge (Crossing of NH 8A, 40mx 29m), mechanization of dry cargo handling facilities at Kandla Port (Berth No.7&8), development of ship repair/building facility at Kandla (Construction of floating dock of minimum 150 mtr), development of Container Terminal (1100X54m, T-shaped, capacity 2.2 Million TEU’s/ Annum) at Tuna off-Tekra, strengthening of Oil Jetty No. 1 and 2, modification and strengthening of Cargo Berths 1 to 6 at Kandla Port Trust, construction of Port Craft Jetty & Shifting of SNA Section 114.95x12m at Kandla Port. Total estimated capital cost of all the 13 projects is Rs.5350.48 crores. The total land requirement for all projects will be 171.85 hectares but there is no land acquisition involved as the land is owned by KPT and proposed activities are within the limits of Kandla Port Trust. Water requirement for the project is estimated 19 KLD. The capital dredging will be of 3, 48, 16,993 M3

with maintenance dredging of 59, 90,294 M3 per year. The ToR was granted by MoEF, New Delhi for integrated EIA of above on 22nd May, 2012. One year base line data was collected from site & surroundings. The draft EIA report was submitted to Gujarat Pollution control board for public hearing which was completed successfully on 18th December, 2013. PP informed with respect to the complaint of Shri Debi Goenka regarding the commencement of work prior to EC, destruction of mangroves etc, stated that they have not started any work and there are no destruction of mangroves

The Committee deferred the proposal and advised the proponent to submit the following information. The proposal shall be further considered once the information is submitted.

(i) Submit copy of the recommendations of Gujarat CZMA (ii) Submit detailed /proper response on the issues raised during public

Hearing (iii) Compliance of ToR conditions with legible maps and details (iv) Submit the details of compliance with earlier EC conditions

- -

Environmental Clearance for development of Integrated facilities within

Annexure-A EAC MOM Dt- 31.07.14

3.21

vivek
Highlight
vivek
Highlight
vivek
Highlight
vivek
Highlight
vivek
Highlight
Page 5: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

1

Minutes of the 25th meeting of the Gujarat Coastal Zone Management Authority held on 10-04-2015

The 25th meeting of the Gujarat Coastal Zone Management Authority

Compliance report with respect to the decision taken in

the 24th meeting of the GCZMA, which was held on 05-01-

2015.

Preparation of an action plan for development of Bio-

Shielding project for entire area between Dahej and Hazira

by way of planting various species of vegetation, such as

mangroves, seaweeds, sea grass, casurina to control the soil

erosion, stabilize the areas and for protection in case of

Tsunami in association with any institute/Organization

having some experience in this Field

The Authority was apprised that as decided in the 24th

GCZMA meeting, the GEC has been requested vide this office

(GCZMA) was held on 05-01-2015 under chairmanship of Shri P. K.

Taneja, IAS, Additional Chief Secretary, Forests & Environment

Department and Chairman, GCZMA in the Committee Room, F&ED,

and Gandhinagar. A list of the members and other participants, who

attended the meeting, appears at Annexure A. Also a list of the

representative of various project proponents, who have made

presentation before the Authority is, appears at Annexure-B.

Initiating the meeting, with the permission of the Additional Chief

Secretary, Forests & Environment Department, and Chairman of

GCZMA, the Member Secretary, GCZMA, welcomed all the members

of the GCZMA and other participants.

He briefed the Members of the GCZMA about the agenda items for the

meeting and various actions taken by the Department in compliance

of the various decisions taken during last meeting

The agenda wise discussion and decisions taken thereafter is as

under:

Agenda item No: 25.1:-

Annexure- B, MoM of 25th GCZMA, Meeting dt 10/4/15

vivek
Highlight
vivek
Highlight
Page 6: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

19

within CRZ-I(B) area. However as per the observation of the

report from GEER Foundation, it also falls within CRZ-I(A) area

The Authority deliberated the proposal of M/S Vasta

Govind Chavda Salt Industries, report received from GEER

Foundation, and after detailed discussion, it is decided

to defer the proposal of VGCSI and ask the project

proponent to submit revised proposal avoiding the

biologically active mudflat and potential mangrove areas.

It was also decided to ask the District Level Committee to

investigate the matter regarding construction of bunds

for salt pans without obtaining necessary permission

from the competent authority and identify the violators in

the area and take necessary actions immediately.

25.5 CRZ Clearance for Developing Integrated facility within

the existing Kandla Port at Kandla, Dist: Kutch by M/S

Kandla Port Trust

The Kandla Port Trust(KPT) , Kandla vide its letter dated

09/10/2013 had approached this Department seeking

recommendations from the GCZMA for obtaining CRZ

clearance for proposed development of Integrated facilities

within the Kandla Port at Kandla, Dist: Kutch.

The Authority was apprised that the proposal of the KPT was

scrutinized by the Technical Committee in its 12th meeting,

which was held on 21-07-2014, wherein representative of the

KPT made a presentation before the Technical Committee

about the activities to be carried out in CRZ area, EIA report

prepared by the Mantec Consultants Pvt Ltd, New Delhi and

CRZ map duly demarcation of HTL CRZ Boundary etc.

Prepared by the Institute of Remote Sensing, Anna University,

Chennai (An agency authorised by the Ministry of Environment

and Forests, Government of India).

vivek
Highlight
Page 7: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

20

Representative of the KPT submitted that at present following

marine facilities existed in KPT:

12 Dry Cargo Berths (Total 16 berths, 13th & 15th Cargo

Berths and Barge Jetty by IFFCO also started commercial

operation),

6 Oil Jetties,

4 moorings for mid stream handling of cargoes.

The KPT has proposed following activities in CRZ areas:

1. Development of Barge jetty at Tuna ( 500 Mx12m, Capital

Dredging: 4,50,000 M3, Maintenance Dredging: 2,30,000

M3/year, Back up area: 15 ha, optimal capacity: 6.57

MMTPA)

2. Development of Oil jetty to handled liquid cargo and ship

bunkering facilities at Old Kandla( Jetty: 300m X15m,

Approach: 450mX10m, Back up area: 5.5 ha, Capacity,

3.39 MMTPA, Capital Dredging: 1,73, 660 M3,

Maintenance Dredging: 1,56,294 M3)

3. Development of Barge handling at Khori Creek , KPT(

Length of the Wharf, 1000, Width of the Wharf, 12M,

Total back up area: 25 ha, Capacity, 8.57 MMTPA,

Capital Dredging: 6,33, 333 M3, Maintenance Dredging:

5,70,000 M3/year)

4. Up gradation of Barge handling capacity at Bunder Basin

at Kandla

5. Providing Railway Line from NH 8A to Tuna Port;

6. Multipurpose cargo Terminal at Tekra off Tuna :Stage II(

T-shape jetty-600m X 80m, Capacity:9.08 MMTPA, Back

up area: 80 ha)

7. Contraction of Rail Over Bridge at NH-8A near Nakti

Bridge

8. Mechanized of Dry Cargo Handling facility at Kandla

Port(Berth 7&8)

9. Development of Ship Repairs/Building Facility at Kandla

Page 8: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

21

10. Mega container Terminal at Tuna off Tekra on BOT Basis(

Jetty: T-shape 1100m X54m, Capital Dredging:

33.56Million M3,, Stack yard Area:41 ha, Break water :

1500m on each side)

11. Strengthening of existing Oil Jetty 1&2

12. Modification and Strengthening of Cargo berths 1 to 6 at

Kandla Port

13. Construction of Port craft jetty of SNA Section at Kandla

Port

The Authority was apprised that the representative of KPT

submitted that there is no land acquisition as the land is owned

by KPT and proposed activities are within limit of Kandla Port

Trust. @ 11 KLD of water would be required for

construction and @8 KLD of water required for domestic use.

The water requirement would be met through reservoir near

Bhachau through 18’’ pipeline of Gujarat Water Supply and

Sewerage Board. No Biosphere Reserves, Wildlife sanctuary,

National Park or area of Cultural importance is present near

the project. The project site does not touch any State or

National boundary.

It was submitted that based on the EIA study, the baseline

environment was found considerably good and after proposed

project there would not be any visual difference in the baseline

condition. Almost all the impacts of the proposed projects

operations would be restricted to the premises only. There

would not be any considerably negative environmental as well

as social impacts due to the propose projects. The KPT shall

effectively implement the mangrove Development , protection,

and Management plan for control of impacts on mangrove

habitat.

The Committee asked about the exact details of railway line

alongwith its route, length, methodology to be adopted for

Page 9: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

22

laying of railway line, exact details of foot print of railway

line, details of mangroves required to be removed/cut(Density,

area, No of plants, girths etc) due to all proposed facilities etc.

Neither representative of KPT nor consultant was able to

explain the details. Also the Committee observed that proposed

route of the railway line was not superimposed on CRZ map.

After detailed discussion and deliberation on the presentation

made by the representative of the KPT, it was decided to ask

various details s from the KPT. The KPT was asked to submit

required details on 25th August, 2014 . The details has been

submitted by the KPT vide its letter dated 10-121-2014.

The proposal was discussed in the 24th meeting of the

GCZMA, which was held on 05-01-2015 alongwith the visit

report of the Technical Committee dated 02-01-2015 and

based on the observations of the Technical Committee, it was

decided by the GCZMA to issue Directions under Section 5 of

Environment (Protection)Act, 1986. Accordingly, Directions

under Section 5 of the Environment(Protection) Act, 1986 were

issued and KPT was directed to stop all the construction

activities, which were started in violations of CRZ Notification

2011. In the meantime, the District Level Committee has also

submitted site visit report dated 17-01-2015, which shows that

KPT has started construction of some proposed activities

without obtaining necessary clearance . The KPT has

submitted its reply vide letter dated 23-02-2015, submitting

that they have started some of the activities because of their

concession agreement with M/S Adani Kandla Bulk Terminal

Pvt Ltd and for strengthening some structures which were

badly damaged in the cyclone of 1998 and the Earthquake

during 2001. They have requested to send recommendations to

MOEF&CC, GOI. The BISAG, Gandhinagar has also submitted

Time series satellite imageries for mangroves in KPT for month

Page 10: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

23

of February, 2006 ,December, 2011, April,2014 and January 2,

2015, which shows that from 2011to 2015, destruction of

mangroves had taken place.

The representative of the KPT made a presentation before the

GCZMA and submitted that they have stopped all the activities

,which were started without obtaining necessary clearance

from the competent Authorities and they have assured that

they would carry out only those activities, which are not in

violations of any environmental laws and they would ensure

that they would bot destruct any mangrove for the proposed

activities , which may be allowed by the GCZMA. They will

submit revised proposal for Development of Ship

Repairs/Building Facility at KPT, development of Barge

handling at Khori Creek , KPT, Mega container Terminal at

Tuna off Tekra on BOT Basis. They have dropped project for

development of Barge Jetty a Tuna. They have further

submitted that now they would now take up project for

strengthening of existing Oil Jetty 1only, Modification and

Strengthening of Cargo berths for 6 only at Kandla Port

As per the CRZ map duly demarcation of HTL CRZ Boundary

etc. Prepared by the Institute of Remote Sensing, Anna

University, Chennai, proposed facility falls in CRZ-I(B), CRZ-III

and CRZ-IV categories.

The Authority deliberated the proposal of Kandla Port

Trust observations made by the Technical Committee,

report submitted by the District Level Committee, satellite

imagines submitted by the BISAG, Gandhinagar and

assurance submitted by the KPT, and after detailed

discussion, the GCZMA has taken following decisions:

1. To recommend to the MOEF&CC, GOI for following

facilities only with the conditions mentioned thereunder:

vivek
Highlight
Page 11: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

24

Development of Oil jetty to handled liquid cargo and ship

bunkering facilities at Old Kandla( Jetty: 300m X15m,

Approach: 450mX10m, Back up area: 5.5 ha, Capacity,

3.39 MMTPA, Capital Dredging: 1,73, 660 M3,

Maintenance Dredging: 1,56,294 M3)

Up gradation of Barge handling capacity at Bunder Basin at

Kandla

Multipurpose cargo Terminal at Tekra off Tuna :Stage II( T-

shape jetty-600m X 80m, Capacity:9.08 MMTPA, Back up

area: 80 ha)

Contraction of Rail Over Bridge at NH-8A near Nakti Bridge

Mechanized of Dry Cargo Handling facility at Kandla

Port(Berth 7&8)

Strengthening of existing Oil Jetty 1

Modification and Strengthening of Cargo berths 6 at Kandla

Port

1. The KPT shall have to ensure that there shall not be any

damage to the existing mangrove area.

2. The KPT shall prepare an emergency plan to protect existing

mangrove in case of any eventuality/accident .

3. The KPT shall have to make a provision that mangrove

areas get proper flushing water and free flow of water shall

not be obstructed.

4. The KPT shall have to abide by what ever decision taken by

the GCZMA for violations of CRZ Notification 2011

Page 12: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

Detailed /proper response on the issues raised during public Hearing

Sr.

No.

Name and address of

person asking question

and Issue raised

Detailed replies on

the issue raised

during public

hearing prepared ,

considering written

reply already

communicated as

per public hearing

minutes

Remarks

1

Shri Naranbhai

Memabhai Ahir,

Sarpanch Rampar

(Tuna) Taluka: Anjar.

The Public hearing

scheduled today is not

acceptable to us because

you have held it very near

to the Kandla Port, which

should have been near our

village and in the center.

The cassette shown now in

which environmental

issues pertaining to

dredging, railway line and

In the present

proposal, out of total

13 projects, 9 projects

are located at Kandla

area , 3 projects are

located at Tuna area &

one project railway

line is connecting from

Kandla to Tuna area

.Hence, it was decided

to fix the P.H.Place in

the center of both

Kandla & Tuna area.

Public hearing is not

for particular project

but for integrated

projects there for it

has been held here,

we have informed all

village panchayats.

No false information

included by KPT in

presentation.

Presentation is based

The

representatives

of the Member

Secretary stated

that many times

there are

technical

problems in the

website.

However, the

executive

summary has

been forwarded

to the Gram

Panchayats of

each affected

village and as

stated earlier

the report has

been forwarded

to all the places.

Annexure- C Detailed Proper Responce on issues raised during Public hearing

vivek
Highlight
Page 13: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

road have been prepared,

that information is

completely false for which

I have information.

The website which is

mentioned here it has

been tried for many days

and it is not opening and if

it opens the same may be

shown it right now.

Therefore, we are against

this public hearing. A new

date may be fixed and the

venue should be kept in

our center under

intimation to us.

on EIA Report

prepared by

QCI/NABET Accredited

EIA Consultant, M/s

Mantec.

All the project related

documents have been

uploaded on GPCB

website on specified

time. Annexure file

had not been

downloaded due to

any technical problem

or internet

connectivity.

However, news for

public hearing has

been published in local

& National daily news

paper before 30 days

of public hearing.

2 Ahir Falgun Nathubhai,

President, Tuna Coastal

Area Council.

I am aware of the process

of the Mangrove

plantation. Shri Naranbhai

talked about website that

everything is with us in

writing. We have tried to

download copy from the

net. Since last 6 – 7 days

The website is never

opens. The ordinary people

cannot directly go to

office. Cannot come to you

and nobody has time to

All the project related

documents have

uploaded on GPCB

website on specified

time by GPCB.

Annexure file might

not be downloaded

due to any technical

problem or internet

connectivity. However

news for public

hearing has been

published in local &

Page 14: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

listen. The website even

now does not open. There

is some technical

conspiracy. The same may

be classified. Such serious

thing cannot be allowed.

This is matter of people

residing near sea shore

with their health and

future. It is not only the

matter of favour, there are

certain technical defects,

in project all of which are

in my hand. It is

mentioned in detail and

therefore it is necessary to

inform that this application

may be accepted and the

O.C. may be returned duly

signed.

The consultant engaged by

KPT, if approved by

„NABET‟, then it is

necessary to have

documents, and the

procedure adopted for

collecting Air, water

samples by them In which

lab it is analyzed, what

procedure was adopted to

take Delhi as when the

samples are to be taken so

far away then its proper

analysis can not be done.

We demand that all this

National daily news

paper before 30 days

of the Public Hearing

and hardcopies of the

report was made

available for public at

concerned offices of

Gandhidham & Bhuj.

Further, the executive

summary has been

forwarded to the

Gram Panchayats of

each affected village.

The representative of

the company stated

that the consultants

have been approved

by „NABET‟ and the

certificate has been

annexed to the report.

Sampling and analysis

of the air, water and

soil samples have

been done as per the

CPCB guidelines for

Ambient Air & Water

Quality Monitoring and

IS Methods. Field

The Member

Secretary stated

that the OC shall

be signed by my

staff Member

and the project

proponent

should furnish

the reply also.

Member

Secretary asked

the project

proponent to

reply as regard

the „NABET‟ and

the sample.

Page 15: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

information may be

furnished to us in writing.

The place where this has

been kept is 10 KM away.

It is not appropriate to

held the hearing of Tuna

Port at Kandla Port.

Therefore, this hearing

stands cancelled. It is the

demand of our village

people that after

examining of all these

things the hearing may be

held again at Tuna Port.

parameters like

temperature pH have

been observed on site

and other parameters

have been analyzed at

Mantec Environment

Laboratory, Noida , A

NABL & MOEF

accredited laboratory

(NABL & MOEF

certificate is enclosed)

In the present

proposal, out of total

13 projects, 9 projects

are located at Kandla

area , 3 projects are

located at Tuna area &

one project railway

line is connecting from

Kandla to Tuna area

.Hence, it was decided

to fix the P.H.Place in

the center of both

Kandla & Tuna area.

Public hearing is not

for particular project

but for integrated

projects there for it

has been held here;

we have informed all

village panchayats.

3 Shri Naranbhai Ahir,

sarpanch village

Rampar (Tuna)

4000 trees have been

planted and it has been

mentioned that again 4000

trees will be planted. But,

crores of trees have been

destroyed which have

been seen by us and on

visiting the place one can

get the idea as how much

greenery is there and how

It is confirmed that

KPT has not destroyed

any trees.

Page 16: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

much trees have been

destroyed.

Railway track will be

coming in which still some

trees will destroy. There is

greenery in this area and

from where to where the

railway track will be laid

and in which how many

trees will be destroyed.

Against this at which place

the tree plantation will be

made. In Tuna and vandi

area How many lac trees

have been planted by you

and at what place? All

uprooted trees have not

been planted. Whether this

has been think over or

not?

Location of Railway

track has already

been mentioned in the

drawing available in

EIA Report. Further, it

is to mention here

that railway track will

be laid only after

obtaining statutory

permission from

concerned regulatory

authority of

Environment.

Mangroves Plantation

in 1000 Hectares has

been done by KPT and

details of the same

are available in EIA

Report. In future

further plantation of

mangrove will be

under taken and there

is no necessity to

remove the

vegetation.

The Member

Secretary asked

the project

proponent to

furnish clear

answer.

4 Shri Kiritsinh Narubha

Jadeja, village Kidana.

The EIA report is

unreasonable and wrong.

The Public Hearing cannot

be held with such wrong

report.

The consultant who has

prepared the EIA report

has received approval for

Jetty and Railway whereas

we have projects of many

types for which separate

The EIA Report has

been prepared by

accredited EIA

Consultant, M/s

Mantec, New Delhi.

Hence, it cannot be

treated as wrong

report.

Mantec Consultants is

NABET, QCI

accredited consultants

for category-A

projects of various

sectors like Petroleum

-

Page 17: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

EIA report is required to

be prepared. Therefore,

this public hearing is

actually unreasonable and

it misleads the public.

In EIA report fisherman of

Tuna and Vandi are

engaged in the fishing

business, there is

“Kumbhar” community.

They prepare earthen

pots, which are famous in

Kachchh, this household

industry has not been

included in the report. To

what extent this EIA report

is reasonable? The public

hearing should be

cancelled. The place where

the project is coming

where the local public is

staying, there public

hearing should be held.

Small people cannot take

part in this. Only those

people who have vehicle

can take part when held in

Kandla. Therefore, after

having considered each

and every issue, the EIA

report can be considered

Refining Industry,

Chemical Fertilizers,

Jetties, Highways,

Railways, Transport,

River Valley, Hydel,

Drainage, Irrigation

projects, Thermal

Power Plants and etc.

Mantec Consultants

established in 1979

and has already done

EIA studies for Port

projects in India and

overseas, e.g. EIA

study for Ennore Port

project for Chennai

Port Trust & etc.

The EIA Report has

been prepared by

accredited EIA

Consultant, M/s

Mantec, New Delhi.

In the present

proposal, out of total

13 projects, 9 projects

are located at Kandla

area , 3 projects are

located at Tuna area &

one project railway

line is connecting from

Kandla to Tuna area

.Hence, it was decided

to fix the P.H.Place in

the center of both

Kandla & Tuna area.

The KPT consultant is

approved by MOEF

whatever permissions

are required to be

taken. The report has

been prepared by

Govt. approved

agency.

Page 18: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

true if prepared by some

approved consultants.

Otherwise the EIA report

shall only be meant to

mislead the public.

5 Shri Chavda Hussain

Khamisha, Sarpanch,

Kidana Bharapar Juth

Panchayat.

When Kandla Port was

constructed sixty years

ago our the earth was

taken from village. No

where there is the name of

Kidana village. Name of

Bhuj, Anjar and

Gandhidham is there.

There is no water in my

village, no road is there. I

had been personally went

to Vaghela Saheb around 6

– 8 months back. It was

given in writing that

nowhere there is beautiful

lake as it is in Kidana and

Shinay of Anjar and

Gandhidham Taluka. I

talked about water and

road. Media people please

pay special attention, the

land of our Kidana village

was acquired 50 years

back, which is lying as it

was. Our farmers are

wandering without any

purpose. The farmers of

our village are saying that

they doesn‟t have house to

live in. In my village only,

there are 600-700

huts(slum). The people are

sitting since cyclone and

KPT has sanctioned

Rs. 30 lacs as a part

of social economic

responsibility. The

Kidana is included in

the affected villages.

Whatever needs are

there shall be fulfilled

-

Page 19: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

earthquake occurred in

Kandla. For them Govt

says remove hut. Our land

which has been acquired

only for Rs. 0.80 per

square meter. It is 700-

800 acre land of Kidana

and Antarjal village from

Zone to Kapilmuni

Ashram. What benefit has

been given to Kidana. No

benefit of road, drainage

or water has been given to

our Kidana village. Name

of so many villages came

but name of our village

Kidana-Bharapar is

nowhere. We do agree

with Naranbhai and people

of Tuna that this place is

not suitable to us and we

are opposing it.

Where will our fishermen

bretherin go? Fishermen

sitting 3 kms away from

Jogninar temple are

travelling 6 km on donkey

cart to drink water. Where

is the Govt? Who will

supply them water. We

request KPT and

representatives of Govt. to

change the place of

hearing and conduct the

hearing again. If not

today, another one should

be held tomorrow. Once

again I am repeating that

our Kidana and Bharapar

villages are very near to

the port then why its name

does not came.

Our land worth millions of

rupees has been acquired

by KPT. 41 acres land

In the present

proposal, out of total

13 projects, 9 projects

are located at Kandla

area , 3 projects are

located at Tuna area &

one project railway

line is connecting from

Kandla to Tuna area

.Hence, it was decided

to fix the P.H.Place in

the center of both

Kandla & Tuna area.

.

For this particular

proposal, no land

acquisition is required.

Page 20: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

which belonged to my

father has gone to zone

and KPT and we got only

Rs. 8200/-. I am pained.

This project will be

benefial but those who are

having right on it should

get it.

The proposed projects

are on KPT land.

6 Shri Atubhai Karabhai

Dafda, Ex-Sarpanch,

Kidana village.

Sir, my request is that

CSR fund is meant for

villages and not for cities.

Municipality gets crores of

rupees as grant. Villages

suffer on account of

pollution and money is

being spent in city.

Today there is no drinking

water in Kidana. At the

time of earthquake, I had

made representation in

KPT. We have been ruined

suffering their pollution

and is there any meaning

of your wrong answers?

At the time of earthquake,

Shri Khimji Jaisang and

myself had submitted that

the road may be

constructed for us. Tell us

about even a single issue

in respect of Kidana

village.

Our farmers labours have

become homeless. Please

show me a single person

who has been employed

by you. The condition of

the farmers and the

fishermen of Tuna is the

KPT included all the

affected villages under

CSR Scheme.

Kidana has been

included as the

affected village, which

earlier was left out

owing to oversight.

After discussing with

the villagers, it will be

decided how the

decided amount of Rs.

30 lacs earmarked by

the KPT shall be

spent.

No land is being

acquired for this

project. Nobody is

going to lose his land,

it will be on the land

belonging to KPT.

The Honorable

Chairman

requested

everybody to

make

submissions one

by one.

Page 21: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

same. They will become

homeless. You will now

take them into confidence

and later on you will be

doing what you want.

You go to the villages and

ask them they are eager

to release their Issue

(steam). Considering

adjoining areas of Tuna,

then all the adjoining

villages are covered.

7 Shri Shambhubhai

Bhachabhai Jaru –

Village Kidana.

Now when Rs. 30 lacs are

to be allocated for kidana

and other villages then

until now the name of

Kidana was not in the

map? Whether Kidana‟s

land has not gone?

In yours acquired land

Certain undesired activities

are taking place on

account of Babul (Thick

vegetation). Because the

cleanliness is not being

maintained, it is not safe

to venture out with family

after 10:00 hours. What

shall be done for this?

5700 acres of land has

been acquired after 1971,

for which Kidana has not

been allocated a single

rupee. What is the reason

for this? Is it not in the

Kidana has been

included as the

affected village, which

earlier was left out

owing to oversight.

Land has not been

acquired for this

project and shall not

be acquired. The

project will be coming

up on KPT‟s land only.

KPT would remove the

thick vegetation in

near future remove

which has been talked

about. This has come

to notice now.

Only recently KPT has

started taking

Economic –Social

Responsibility. KPT

cannot state what

happened 50 years

The Honorable

Chairman

requested to

make

submissions one

by one in

peaceful manner

so that the

submissions can

be understood.

Page 22: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

map? 82 acres of land has

been acquired for drainage

separately after 1982,

there is no drainage

system and no drop of

drainage water falls in it

then why you have

acquired? You had told

that whatever land has

been acquired shall be

developed in 30 years.

than the acquisition is

done to harass the public?

The activities like theft,

which are taking place in

babul (thick vegetation)

why these are not cleaned.

Representation has also

been made in writing to

KPT on the letter pad of

Honorable MLA Shri

Rameshbhai Maheshwari.

Why you are not

answering the questions of

none allocation of funds

for Kidana village? We will

follow the path of

„Gandhiji‟.

back.

The Member

Secretary asked

to inform clearly

about whatever

works are

carried out.

Some people

from the

gathering stated

that they would

like to have the

response in

writing. The

Chairman stated

that the

company will

inform in writing

also.

8 Shri Jadeja Kiritsinh,

Village - kidana

The company is not in a

position to answer even a

single issue. If name of the

village is not included in

the EIA report, then there

is no purpose of this public

hearing.

KPT included all the

affected villages under

CSR scheme and Rs.

30 lakhs has been

allocated to each of

the villages.

-

9. Shri Kasambhai Traya

Village-Gandhidham.

Mantec Consultancy, who

has prepared this EIA

report, what kind of

Mantec Consultants is

NABET, QCI

accredited consultants

Page 23: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

project reports they are

entitled to prepare?

As per our knowledge they

are only entitled to

prepare EIA report for

Jetties. Along with this

there are many projects.

Liquid terminal is there,

Strorage or backup is

there, Railway is there,

Road is there. There are

many such projects but

whether Mantec has

approval for preparing the

EIA report for all these

projects. If there is

approval, the documents

may be submitted.

The gathered people again

submitted that social

works have not been

carried out and submitted

that competent official has

not been present to

furnish the reply.

for category-A

projects of various

sectors like Petroleum

Refining Industry,

Chemical Fertilizers,

Jetties, Highways,

Railways, Transport,

River Valley, Hydel,

Drainage, Irrigation

projects, Thermal

Power Plants and etc.

Mantec Consultants

established in 1979

and has already done

EIA studies for Port

projects in India and

overseas, e.g. EIA

study for Ennore Port

project for Chennai

Port Trust & etc.

Only recently KPT has

started taking

Economic –Social

Responsibility. KPT

cannot state what

happened 50 years

back. Whatever the

Kidana village decides

those facilities shall be

provided.

The Honorable

Chairman stated

that all these

details have

been included in

the minutes.

10 Kiritsinh Jadeja.

Village - Kidana

When the Kandla Port was

developed and the farmers

whose land was acquired

are finding it difficult to

survive and company says

we shall be looking into it.

That is really not

reasonable. Those farmers

have been visiting KPT

since last 50 years we are

not getting any fair justice.

Kandla Port has taken

the responsibility of

CSR since 2011. The

question of Kidana in

the new project has

been covered. The

works shall be taken

up after consultation

with village people. No

new land is to be

acquired for this

Chairman stated

that we shall

forward your

submission to

the Govt. for

this purpose the

public hearing is

held and we are

not going to

decide as to

whether the

Page 24: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

And during the public

hearing when the people

are vigilant, then those

whose land has been

acquired in the project

have to be given

satisfactory reply. The new

project should be taken up

thereafter only and public

hearing be conducted.

project. project is to be

sanctioned or

not

subsequently

the copy of the

report can be

made available

to you.

11 Shri Kasam Traya,

Gandhidham

In the CSR it has been

stated that KPT has

granted funds in city only

for the CSR. The amount

allocated for villages is too

small. It is not possible to

construct road from this.

Tuna, Vandi, Rampar,

kidana all are coming

within the area.

In the survey conducted

by you, you are also not

aware of the villages which

are covered. In that case

to what extent this public

hearing will be successful?

You do not know how

many villages are there,

how many are affected.

You do not have its

survey. Here itself you are

wrong. The details of EIA

report are false.

Mangrove destruction

details have been

furnished. It is mentioned

that there is only mud.

Whereas in fact there is

large dense mangrove.

Tekra, Khori creek where

There are about 10

villages in the vicinity

which include Tuna,

Vandi, Rampar.

Representation from

the villages from time

to time shall be

included. The

requirement of your

village may be given

in writing.

Kidana has been

included as the

affected village, which

earlier was left out

owing to oversight.

Only few sparse

mangroves will be

affected due to the

proposed project and

compensatory

mangrove plantation

will be done as per the

-

Page 25: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

this project is

proposed(coming).

Are you aware that there

is human habitation in

Tekra and Khori Creek.

The fishermen reside there

prior to inception of Kandla

Port. There is no facility of

employment to fishermen.

CRZ clearance which has

been granted for Tekra has

been 100% violated.

CRZ clearance has been

granted on condition that

creek will not be blocked,

you will not destroy the

mangroves, there shall be

no side effect on the

livelihood of the

fishermen? Reply to these

three questions be

furnished. You should have

come fully prepared for

public hearing.

recommendations of

statutory authorities;

however KPT has

already done

mangrove plantation

in 1000 hectare area

as per the condition

mentioned in the CRZ

recommendation letter

for 13 to 16 cargos

berths. CRZ

application for

proposed project has

been submitted to

GCZMA and

construction activities

will be started after

getting Environment

and CRZ clearance.

This project is on

water and coast. It

cannot harm the

human habitation. The

project is to come up

on the land belonging

to KPT.

MoEF,GoI had

accorded

Environmental/CRZ

Clearance for

Developing Dry Bulk

Terminal Project at

Tuna Tekra and the

work is being carried

out by M/S AKBTPL

(concessionaire) as

per the stipulated

conditions mentioned

there in. No creeks

have been blocked by

M/S AKBTPL.

Page 26: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

12 Shri Shambhubhai Ahir,

Village-Sanghad.

The company is not aware

that who is called the

Agariya? Who is called

fisherman? Who is called

public? Who is called

farmer? All should be

issued notice and work

should be done in public.

How much of our land has

been taken by force. My

village is in the affected

area and not a single

village has been included

for the development.

All the leaders of the

village have come in this

public hearing. You would

understand the problem of

common people? Even

small person should come

in this hearing.

Today‟s public hearing has

been scheduled for file

opinion as per the rule of

govt. where Class I Govt.

Officers has opined that

this is not grassing land.

The grassing land is also

allotted for salt in this

manner have the orders

also.

Since 60 years the KPT

has suppressed us. Even

today many cattle land

have been taken over.

They have not kept their

promise. They had asked

the land for development.

Neither development has

been done nor the land

has been returned to us.

There are about 10

villages in the vicinity

which include Tuna,

Vandi, Rampar etc.

and KPT included all

under CSR Scheme

and kept 30 lakhs for

each village for

development.

Representation from

the villages from time

to time shall be

included. No land

acquisition has been

required.

The Honorable

Chairman stated

that we have

not to give any

decision/

opinion

Page 27: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

13 Shri Kasambhai Traya.

Ta.Gandhidham

Once again Kasambhai

stand up and stated that

whatever questions I

asked earlier are technical

questions and not a single

has been replied. I have

come with 100% proof.

Where is the location of

1000 hectares of

mangrove plantation? Are

you aware that what is the

CRZ? Why This project has

not been considered within

A1?

These projects are

taken up with

permission of MOEF.

Mangroves if any

destroyed comes

within the permissible

area. Kandla Port has

not done anything on

its own. Apart from

this now mangrove

plantation is to be

done. Creek has not

been blocked.

Everything will be

furnished to you in

writing.

Project consultant Shri

Arvinder S Brara

stated that their

company is

accredited. The

project could not be

taken up without

accreditation. Our

laboratory is not only

accredited by NABET

but also certified by

NABL, MOEF and ISO.

Your question about

the mangrove is

sensitive. Plantation of

mangroves has been

shown in the report at

many places. Many

times the trees are

required to be

destroyed, and then

the rules are that if

you cut 100 trees then

you have to plant

more than that. You

are some what correct

-

Page 28: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

At what locations the

mangroves have been

planted?

Renuka Sugar had also

asked for permission to

construct jetty in this area.

They have not been

granted EC andtheir

proposal has been

cancelled then how could

you proceed ahead. What

has happened so that

there are separate rules

for KPT and Renuka Sugar.

Rules should be same for

all.

that for construction

of jetty few

mangroves are

affected. But the same

are not badly affected

and are planted again.

KPT has replanted the

mangroves in

association with forest

and ecology

department.

Report mentions that

plantation has been

done in Sat-Saida

island and Nakti

creek.

Your question is

correct. Your worries

are justified that

mangroves and

ecology balance has to

be taken care of.

There should be no

harm to those. There

is committee for CRZ

one should have faith

in it. Based on our

mitigation measures

they shall take

technically suitable

decision.

Project with crores of

rupees is coming and

there will be increase

in employment and

happiness. For this

nature should not

suffer. The CRZ

committee shall

examine all the details

and then take

decision. KPT shall be

Page 29: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

doing all the things as

per rules only. it is

helpful and wishing to

help. Earlier also I had

meeting with the Chief

Engineer to address

the concerns of the

villagers who come

here. And we have

recommended that

the panchayats should

be allocated projects

independently. The

matter cannot be

resolved by simply

opposing. Opportunity

should be given. You

shall get whatever our

rights are. You shall

get reply in writing

also.

14 Shri Shambhubhai Ahir,

Village – Sanghd

All those KPT officials

present here does not

have any capacity to reply.

KPT Chairman or deputy

Chairman should remain

present so that we can get

assurance.

KPT‟s Dy. Chairman is

present and the Chief

Engineer is also

present. Responsible

officers are present.

They are unable to

reply in Gujarati,

therefore, we are

replying.

The Honorable

Chairman stated

that officers can

give assurance

regarding CSR

in Hindi also.

15 Shri Hasam Vira

Kagreja Village-

Thermal Kandla.

Whether there are

fishermen at Kandla or

not? And if there are, then

how many? We are living

here prior to Kandla Port.

Kandla Port was developed

in 1951, where as our

fishermen are living prior

to that. You are keeping

The representative of

the company stated

that fishermen are

there but their figure

is not available. The

creek of Kandla is not

a fishing zone and

fishermen are not

being disturbed. As

per rules Kandla Port

The Honorable

Chairman asked

to inform as to

what the

company has

done for

fishermen.

Page 30: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

note of incoming and

outgoing wagons, then

why not for fishermen ?

Fishermen are there from

Kandla to Chobari. Till date

Kandla Port people have

not given any facility.We

fishermen are not in their

list.

is not a fishing zone.

They are going for

fishing outside the

creek.

16 Shri Anwar Ayub,

President Kandla Group

Fishing udyog

You have mentioned in the

EIA report that there is no

fishing activity in Kandla.

On what basis this has

been stated? In 1951

when Kandla jetty was

constructed at that time

fishing jetty, Fisheries

process plant and Ice

factory was there.

Fisheries Officer was there.

All of which were acquired

by you in 1979. On what

basis you have stated that

there are no fishermen. A

building is standing in area

Bunder, which belongs to

fisheries department. The

six quarters allotted to

Police Department belongs

to Fisheries Department

which has not been

constructed by KPT. You

are saying that there are

no fishermen. Then where

all these have come from.

The representative of

the company stated

that they have

migrated. The ice

factory & processing

unit are not there as

on date.

The Honorable

Chairman

directed the

company

representative

to furnish the

information as

per records

available with

them.

17 Shri Shambhubhai Ahir,

Village-Sanghad.

We require provision of

fishing activity in your new

project, which is to come

up. In case, for this it

The company

representative stated

that he has not said

that there are no

-

Page 31: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

separate jetty is required

then it should be

constructed. Just now you

had said that there are no

fishermen in Kandla now

you will also say that there

are no fishermen in

Sanghad where

everywhere our fishermen

are living.

fishermen.

18 Shri Usman Gani,

Village-Kandla.

It has been mentioned in

the page 11 chapter 5 of

EIA report that fishing

activity being carried out is

illegally. The

Environmental issues

should be mentioned in

the EIA report.

The creek of Kandla is

not a fishing zone and

fishermen are not

being disturbed. As

per rules Kandla Port

is not a fishing zone.

They are going for

fishing outside the

creek. The important

environmental issues

have already been

included by Mantec in

EIA Report.

-

19 Shri Shambhubhai Ahir,

Village – sanghad

You are saying that fishing

activity is unauthorized

means it is not legal. No

fishermen or salt worker

should be harmed. No land

of the farmer should be

acquired. This should be

assured in writing that no

labour shall be displaced.

Govt. or KPT should make

arrangement at that place.

Also the land allotted to

salt workers should not be

acquired.

The village people

shall be consulted for

CSR activities. There

is no proposed for

requisition of new land

which shall be given in

writing. Your

submission and if

there are any other

issues shall be

resolved through

discussions. No

fishermen shall be

disturbed.

The Honorable

Chairman stated

that the land of

salt worker is

the High Court

matter and will

be dealt with

according to

judgment. The

matter which is

to be submitted

in the High

Court it is a sub-

judicial matter

and I cant say

anything

Fishermen are

Page 32: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

not harmed,

they get

employment,

livelihood and

the company

can reply to the

issue of land

acquisition. Who

so ever makes

submission in

writing shall get

the reply in

writing.

20 Shri Hassam Veera,

Village - Kandla

We do not get registration

of birth and death from

KPT. We do not get

drinking water at all. We

are taking by lecking their

line.

We are living in the middle

of water & there is no path

to walk.

All the area from Kandla to

Adipur has been

beautified. We are living

nearby what is there for

us? Anything was given in

2001?

The company has

started CSR activity

since 2011. If

arrangement of water

shall be possible all

help shall be

extended. The issue of

death registration is

not within our

jurisdiction. It is the

responsibility of Govt

of Gujarat.

KPT will consider this

issue under CSR

responsibility.

Rehabilitation center

is operative even as

on date.

The Honorable

Chairman stated

that considering

the importance

of other affected

villages the

priority can be

decided and

help be

extended.

21 Shri. Aamad Aliya

Manjaliya, President

fisherman’s adhikar

sangh kutch

I am the president of

fisherman‟s adhikar sangh

The

representative

of Member

Secretary stated

Page 33: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

and are affected from

Surjbari to lakhapat I am

making submission in

writing which contains 18

issues. Prior to

commissioning of Kandla

port the fisherman are

residing in Tuna ,

Kharirohar, Chirai, moti

Chirai, etc. Our elders

were coming to Kandla

port for labour work. When

in 1951 the Kandla port

was constructed at that

time the fisherman were

living on all the creeks of

Kandla. Kandla port was

developed than we were

shifted here and there on

the pretext of thefts.

This port has not carried

out any study of these

fishermen. The public

hearing is held whether it

is for Kandla or Tuna

Tekra? Whether Tuna

Tekra is included or not?

since the development of

K.P.T. the land has been

acquired of the village of

Anjar Tal. like

NaniChirai,and moti chirai,

and coastal region‟s Tuna,

vandi, sanghad and right

up to veera. Our fisherman

were living prior to that.

When was the Kandla port

commissioned?

When in 1952 the Kandla

port was commissioned at

that time our fisheries

department was allotted

the land on 30 years lease.

Where our office was

In the year 1952

It is the matter of the

year 1970, there for

presently no light can

be thrown on it.

Presently all this land

is with KPT. Where all

the offices of port and

jetty are there.

The present creek of

Kandla port is not a

fishing zone, no

that the public

hearing is for

the

comprehensive

developments of

facilities on the

existing port of

Kandla, new

land is not being

acquired this

has been

mentioned in

the EIA report.

their proposal is

for the

development of

present port.

Page 34: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

constructed facility for

fisherman was provided.

Platforms were

constructed. The

businessmen were

provided facility for selling

of the fish. This is true.

You are saying that this is

not fishing zone, in that

case the Kandla port which

was since 1960 registering

the boats for 15 years. In

1960 when our fisherman‟s

law came in to force at

that time Government

asked KPT, Maritime

Board, for registration.

Whether you have put on

black glasses there for you

are not able to see the

fisherman hence carryout

the survey of fishermen

and provide facility. Visit

zone Tuna, vandi, Rampar,

and Sanghad villages and

carry out the survey. Do

not violate the CRZ? Do

not destroy the

mangroves. The

Government has

prohibited the destruction

of mangroves in CRZ 1

and CRZ 2. In the Kandla

port where presently Tuna

port is being constructed

there jetty is being

constructed 10 km in side.

Whether there is Violation

of CRZ or what it is? I am

openly telling you that you

have violated the rules and

my fisherman community

is to suffer

destruction has been

done by KPT.

Development has

been done. Mangroves

The present creek of

Kandla port is not a

fishing zone; no

destruction has been

done by KPT.

Developments have

been. Mangroves have

been planted and

wherever required and

permission is there

the mangroves have

been removed

otherwise mangroves

are not being removed

and plantation has

been done in the new

areas. no fisherman

are being disturb. All

efforts to resolve the

issues of fisherman‟s

shall be taken and for

this the meeting shall

be held with

fisherman. As per the

orders of the

government the

Kandla port is full

filing the social

responsibility since

2011. Kandla port has

not violated any rules

Kandla port is working

as per rules and as

per the direction of

MOEF.

22 Shri Ibrahim Amad,

Sarpanch Vandi

Page 35: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

GramPanchayat.

Earlier Kandla port had

held hearing in veera in

that case why hearing was

not held for the Tuna Port

which has been

constructed? Presently the

hearing is for the Tuna

port which is being

constructed? whether it is

the creek being

constructed presently ? At

the location 75% work has

been carried out thereafter

the public hearing is being

conducted?

This public hearing is

for all the integrated

projects no work has

been started. All the

work shall be

commencing here

after. The work for

which we have got the

clearance has been

started. Kandla port

can not start the work

without the

environmental

permission because it

is also a government

organization and

proceeds ahead

following all rules

-

23 Shri. Husenbhai,

Dy.sarpanch vandi

village

whether there was the

name of the village vandi,

in this public hearing?

Whether any meeting was

held with the people of the

panchayat? whether the

vandi village has been

included in this public

hearing.

Whether you have carried

It has been stated

earlier also that all the

surrounding villages

vandi, Tuna, Rampar,

etc. are included. the

vandi was with Tuna

in the census

thereafter it has been

separated. At the time

of preparing. The

report we consider the

censes. The purpose

of this public hearing

it to take corrective

measures if there is

any scope. Your

village is within 10 km

therefore it is included

and all the relevant

benefits will be

extended to you.

The survey has been

The Honorable

Chairman stated

the copy of the

report shall be

provided if

demanded.

Page 36: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

and survey for the project

which is near Tuna Tekra ?

whether the team which

goes for survey has to see

anything at the location or

not? Whether they are

suppose to see if there is

any building or bad things?

Here we have got

panchayat they have

surveyed for Tuna, Tekra

but in the hearing book it

has been mentioned that

there is no person.

Whether there is any

fisherman of the village. If

there is any open space

the same should be shown

to us. Just now it has been

stated by you that this is

not a fishing zone, in that

case whether you have

seen any fishing boats ?

have you discussed with

any leader about this

creek which you have

blocked.

conducted by us it

should be matched

with the census also.

Since your name is

not in the census

anybody can make the

mistake which shall be

corrected based on

the minutes of the

public hearing the EIA

report can be

corrected, your issue

is valid which shall be

corrected by us. As

stated by

Dy.Chairman this area

is coming in no fishing

zone with the purpose

of helping you people

the KPT will resolve it.

The purpose of the

public hearing is to

understand your

problems and to find

its solutions.

The Honorable

Chairman

directed to

furnish

information

based on the

information

available on the

records.

24

Shri. Devjibhai

Dhyabhai Makwana,

Sarpanch Tuna

Grampanchayat

Whether the public hearing

is for officers or for public?

This project where there

are farmers and

fisherman-woman in Tuna,

Tekra, Vandi, Rampar

what are their problems of

schooling? You should

have kept public hearing

at Tuna, please finish reply

for keeping public hearing

at this place. Intimate as

to with whose orders it has

been held at this place. I

Public hearing is for

the public. It has been

kept here to get the

views of the public.

Public hearing is not

for particular project

but for integrated

projects there for it

has been held here,

we have informed all

village panchayats we

Page 37: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

had informed to held this

public hearing at Tekra,

where barge jetty is to

constructed. Present public

hearing has been kept at

12 km distance from my

village. There for how

small person, farmers can

come? Where the

container yard is proposed

there will be destruction of

the mangroves what you

have done and do for

this?

The ship building , ship

repairing are highly

polluting projects there for

it causes adverse effects

on costal environment

without conducting studies

this EIA report has been

presented

Which was the first port,

Tuna or Kandla?

Whether the barge jetty of

Tuna possess by

government of Gujarat or

KPT ?

Where the development

fund has been granted by

KPT till date? Not a single

rupees has been granted

for Tuna, vandi Brothers

whether public hearing at

this place is acceptable to

you or not ? whether the

public hearing shall be

held second time at Tuna?

There is kumbharvas in

Tuna, where there is the

earthen pot making of

making industries which is

have stated earlier

also that we do not

destroy the

mangroves.

The projects shall be

commenced only after

the environmental

permission as required

under govt. rules

regulation.

It was Tuna port

KPT

Earlier social

responsibility was not

with KPT. Since 2011

it fulfills the social

responsibility. Efforts

shall be made for the

resolution of the

issues of your

fisherman. No creek

has been blocked as

per rules if necessary

the public hearing is

held for other projects

in futures any projects

The

representative

of the Member

Secretary stated

that for

upcoming

projects, TOR is

to be approved

by MOEF

thereafter EIA

report is to be

submitted and

thereafter public

hearing is held.

Page 38: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

famous in Asia. Today the

earthen pots made from

the earth brought from

Tuna get broken

immediately. Because

there is lot of pollution in

this earth. KPT has

instructed other agencies

to build port. Not a single

person from any villages of

Tuna has been given

better employment. The

livelihood of our fisherman

has been snatched. There

should be a separate creek

to be constructed for

fisherman for which public

hearing should be

conducted at Tuna.

comes and if required

the public hearing

shall be held. For this

project the public

hearing is in progress.

Whosoever wants to

make submission is

allowed to make

submission. We have

understood your

problem.

25 Shri. Kasambhai Traya,

Village. Gandhidham

We are not satisfied with

this public hearing the

village people are not

agreed to it. The company

does not have answers to

the question whether the

present projects falls in

CRZ I – A or in CRZ I – B ?

This projects falls in CRZ I

– A for this projects

Renuka Sugar had applied

for barge jetty accordingly

it comes in CRZ I – A.

There is no grazing land in

vandi village. There only

business is that of fishing.

The same has not been

taken note of by these

people in the survey. In

very first projects at Tekra

there was CRZ

recommendation for

blocking of creek,

It comes in CRZ I – B.

This projects is of

different natures and

absolutely of Renuka

Sugar.

-

Page 39: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

employment to fisherman,

damage to mangorves all

this has been violated.

Now the new project which

has been brought there is

no assurance that there

will not be violation.

There are violation in the

projects which is on

progress you have blocked

all the creeks. Now you

are doing to block the

remaining creeks. Where

shall our fisherman go?

People over here are doing

the business of fishing only

which is there ancestral

work. These people cannot

go elsewhere for labour

work. The agency which

has erred in conducting

survey to what extent the

EIA report prepared by

them can be considered as

valid? Permission has been

given for jetty and railway

to this consultant.

They do not have

permission for dredging,

storing, and other

projects. There are only

these 2 projects in the

report submitted to the

ministry. If they have any

proofs within how many

days the proofs shall be

furnished to us. If are

available right now the

same may be shown now.

Have all the

permissions and shall

be furnished

subsequently.

26 Shri. Isha Bavala, Ex.dy.

sarpanch Tuna Rampar,

Tal.Anjar

This staff must have

If there is any thing

Page 40: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

conducted survey at Tuna

– Tekra therefore they

shall be aware of how

many no. of fisherman in

Tekra.

What is distance between

Tuna Port and Tekra?

How many fisherman are

there in Tekra?

Presently there are 33

families of fisherman in

Rampar, for which I have

the record. There are in

vandi also, but for them I

do not have record. The

fishermen from their

ancestral times are living

at Tekra. They are going

there by boat from Tuna

presently they have been

kept in confidence that

bridge shall be constructed

across the creek now when

there is full tide the boat

cannot be come. There

after KPT or any other

when establishes a

projects, then their

security shall not allow

them to enter. So what

have you thought about

these fisherman ? whether

survey has been done ?

When the survey shall be

conducted ?

missing in the report,

there is full scope for

modification.

Approx. 6 KM

As stated earlier it will

be included in.

We have not

closed/blocked any

creek even then

considering your

submission, survey

shall be conducted

and your problems

shall be solved.

Consultant of the

company Shri.

Arvinder Brara replied

that this is not a

fishing zone. There for

as per government

rules we cannot

promote the fishing

but since you have

presented this issue,

the same shall be

The Honorable

Chairman also

directed to take

note of this

issue in the EIA

report.

Page 41: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

reviewed in the sitting

with KPT officials and

efforts will be made to

resolved it.

27 Shri. Haji Adam Haji

Junas, Ex. Sarpanch

vandi

To what extent this project

is harmful for fisherman,

can be seen from the

survey done it has been

shown in the report, that 8

mm/L of oil and grease

have been observed.

Whereas per government

rules if it is 4.0 mm/L then

no project can be

approved at that place.

Since with the present

projects the pollution to

the extent of 8.0 mm/liter

has been observed, in that

case what shall be the

effect on the sea water

when another 10 projects

shall be up coming ?

Company says this is not a

fishing zone, than your

zone which is mid Channel,

it extents up to what area?

What is called deeping

area?

Whom the hearing was

held at Vira, we had gone

to meet vaghela saheb, at

that time he said that we

acknowledge that your

fishermen are living there.

The bouya which we are

going to install, shall be

installed in such away that

The consultant of the

company stated that

the contention about

the report of grease

and oil is true but the

permission limit is 10.

This report has been

sent everywhere and

nothing has been

hide. It is within

limits. This will also be

reviewed, as to how

the oil and grease can

be reduced.

It has also been

described in the

report, that what will

be effects on account

of this projects. In the

MOEF also such type

of questions are being

asked. It is

responsibility of KPT

to review it and evolve

measures as to how to

control it.

As per rules this is not

fishing zone. There for

this report does not

mentions it but

resolution of your

issued has been said

earlier.

The

Representative

of Member

Secretary

requested not to

raise the same

questions again

and again.

Page 42: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

it does not harm the

fisherman, so you decide

your zone along with us.

Please reply as to what is

called mid channel and

Deeping area ?

When 10 more projects

will come, to what extent

the pollution will increase ?

I am working as fisherman

with Kandla port since

1978 they are saying that

this is not fishing zone in

that case. I am having

many fisherman licenses

issued by harbour master

of KPT and lastly in 1991

we fisherman were told to

leave this area and go

away. And in the report it

is being written that there

are no fisherman, fishing

zone, boats.

When chemical is un

loaded from the ship from

outside there permission is

given for 11000 M.T. But

to what extent and to the

extent of 54000 M.T you

have reached. To what

extent it is reasonable? are

not you creating pollution

in sea water?

Secondly after loading the

ship, it is washed, how

much water is being

consumed and where this

wastewater is being

disposed off ? where are

Dy. Chairman replied

that tankers with

different chemicals are

coming. No

permission is being

given to wash, the

same with water,

chemical wash is

being done and

permission is given to

again fill it inside the

tanker. There for the

company which brings

the ship, the same

company takes it back

in the ship. It is not

being discharged in

the sea water.

Page 43: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

Place:

Opp. Aarya Logistic, Near Nakti Bridge,

Tuna-Kandla Road, Kandla Port, Kandla,

Ta. Gandhidham, Dist. Kutch.

Date : /1 /2013

you treating it ? what the

project you have, please

intimate?

Where is the waste of the

ship is being kept ? where

is the space of dumping ?

The public gathering

stated that all these

replies are fails KPT has

rendered us no where

there for this hearing be

cancelled.

Looking to the above

all clarifications there

is not necessary to

cancel this public

hearing.

Page 44: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

Annexure-D

Compliance of ToR is uploaded as EIA report.

vivek
Highlight
vivek
Highlight
Page 45: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

Annexure- E Compliance of EC conditions received earlier

vivek
Highlight
Page 46: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt
Page 47: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt
Page 48: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt
Page 49: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt
Page 50: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

ANNEXURE – I Sub: Compliance of stipulations made by various statutory authorities of Ministry

of Environment & Forest, GoI while granting Environmental/CRZ Clearance for the proposal of “Construction of 13th to 16th Cargo Berths at Kandla Port Trust".

Compliance of Conditions

Sr. No.

Conditions Remarks

(A) Special Conditions

1. All measures indicated in the letter dated 4/8/08 shall be strictly complied with

Point Noted.

2. Necessary clearances from the Gujarat State Pollution Control Board shall be obtained before initiating the project.

NOC had already been obtained from Gujarat State Pollution Control Board vide letter dated 09/01/2009.

3. The project proponent shall not undertake any destruction of mangroves during construction and operation of project.

Kandla Port had furnished undertaking to State Forest & Environment Department for afforstation of mangroves in an area of 1000 ha.

A) Mangrove Plantation Plan carried out:

1) Year 2005-06 – 20 hectares 2) Year 2008-09 - 50 hectares 3) Year 2010-11 – 100 hectares 4) Year 2011-12 – 200 hectares 5) Year 2012-13 – 300 hectares Total - 670 hectares

B) Mangroves Plantation in an area of 330 hectares is in progress through Forest Department, GOG.

4. Sewage arising in the Port area shall be treated to conform to the standards stipulated by Gujarat State Pollution Control Board and shall be utilized/re-cycled for gardening, plantation and irrigation.

Point Noted

5. Project proponent shall be prepare a Disaster Management Plan covering emergency evacuation mechanisms etc., deal with natural disaster events and regularly update from time to time

Kandla Port is already having a updated Disaster Management Plan prepared by M/S. Telos Consultancy, Mumbai.

6. There shall be no withdrawal of ground water in COASTAL REGULATION ZONE area, for this project. The proponent shall ensure that as a result of the proposed constructions, ingress of saline water into ground water does not take place. Piezometers shall be installed for regular monitoring for this purpose at appropriate locations on the project site.

Point Noted.

7. The facilities to be constructed in the COASTAL REGULATION ZONE area as part of this project. shall be strictly in conformity with the provisions of the COASTAL REGULATION ZONE

Point Noted.

Page 51: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

Notification, 1991 as amended subsequently.

8. Green belt area shall be developed along the project and budget earmarked.

Necessary greenbelt shall be developed by BOT operator. Copy of the EC letter already sent to BOT operator for compliance of condition stipulated.

9. No product other then those permissible in the COASTAL REGULATION ZONE Notification, 1991 shall be stored in the COASTAL REGULATION ZONE area.

Point Noted.

(B) General Conditions

i. Construction of the proposed structures shall be undertaken meticulously conforming to the existing Central/Local rules and regulations including COASTAL REGULATION ZONE Notification, 1991 & its amendments. All the construction design/drawings relating to the proposed construction activities must have approvals of the concerned State Government Department/Agencies.

Point Noted. However, Kandla Port need not require any approval from State Government Departments for construction design/drawings relating to the proposed construction activity.

ii. Adequate provisions for infrastructure facilities such as water supply, fuel, sanitation etc shall be ensured for construction workers during the construction phase of the project so as to avoid feeling of trees / mangroves and pollution of water and surroundings.

The necessary infrastructure facility will be provided by respective BOT operator of berths.

iii. The project authorities must make necessary arrangement for disposal of solid wastes and for the treatment of effluents by providing a proper wastewater treatment plant outside the COASTAL REGULATION ZONE area. The quality treated effluents, solid wastes and noise level etc. must conform to the standards laid down by the competent authorities including the Central/State Pollution Control Board and the Union Ministry of Environment and Forests under the Environment (Protection) Act, 1986, whichever are more stringent.

Kandla Port is already having STP of adequate capacity and all waste water will be treated in this existing STP.

Each berth will have their on treatment system and treated water will be discharged after meeting the CPCB/GPCB Norms.

13th berth: STP (Details of STP as per Annexure I)

14th Cargo Berth : Work likely to be started in JULY, 2013

15th Cargo Berth : Work in progress

16th Cargo Berth : Work in progress

iv. The proponents shall provide for a regular monitoring mechanism as to ensure that the treated effluents conform to the prescribed standards. The records of analysis reports must be properly maintained and made available for inspection to the concerned State/Central officials during their visits.

Point noted

v. In order to carry out the environmental monitoring during the operational phase of the project, the project authorities shall provide an environmental laboratory well equipped with standard equipment and facilities and qualified manpower to carry out the testing of various environmental parameters.

Kandla Port is having a well equipped Environmental laboratory. Kandla Port has also strengthened the Environment Cell by appointing two Environment Experts from Netel India Pvt. Ltd.

Page 52: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

vi. The sand dunes if any on the site shall not be disturbed in any way.

No sand dunes at project site prevails.

vii. A copy of the clearance letter will be marked to the concerned Panchayat/local NGO, if any from whom any suggestion/representation has been received while processing the proposal.

N/A

viii. The Gujarat Pollution Control Board shall display a copy of the clearance letter at the Regional Office, District Industries Centre and Controller's Office/Tehsilar's Office for 30 days.

N/A

ix. The funds earmarked for environment protection measures shall be maintained, in a separate account and there shall be no diversion of these funds for any other purpose. A year-wise expenditure on environmental safeguards shall be reported to this Ministry's Regional Office at Bhopal and the State Pollution Control Board.

Point Noted.

The B.E. of Kandla Port for the year 2012-2013 under the scheme of “General Environment Programme” was Rs.100.00 Lakhs in R.B.E. and upto date expenditure incurred Rs. 92.6 Lakhs.

Kandla Port has kept Rs.150.00 Lakhs in B.E. 2013-2014 under the scheme of “General Environment Management Programme”.

x. Full support shall be extended to the officers of this Ministry's Regional Office at Bhopal and the officers of the central and State Pollution Control Board by the project proponents during their inspection for monitoring purpose, by furnishing full details and action plans including the action taken reports in respect of mitigative measures and other environment protection activities.

Point Noted.

xi. In case of deviation of alteration in the project including the implementing agency, a fresh reference shall be made to this Ministry for modification in the clearance conditions or imposition of new ones for ensuring environment protection.

Point Noted.

xii. This Ministry or any other competent authority may stipulate any other additional conditions subsequently, if deemed necessary, for environment protection, which shall be complied with..

Point Noted.

xiii. The project proponent shall advertise in at least two local newspapers widely circulated in the region around the project, one of which shall be in the vernacular language of the locality concerned, informing that the project has been accrued environment clearance and copies of clearance letters are available with the State Pollution Control Board and may also be seen at website of the Ministry of Environment & Forests at http;//www.envfornic.in. The advertisement shall be made within 7 days from the date of issue of the

Complied and news paper cuttings already sent to Regional office, Bhopal of MoEF vide letter No. : EG/WK/4660(EC)/01 dated 31/10/2008.

Page 53: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

clearance letter and a copy of the same shall be forwarded to the Regional office of this Ministry at Bangalore.

ix. The project proponent shall inform the Regional office at Bhopal as well as the Ministry the date of financial closer and final approval of the Project by the concerned authorities and the date of start of Land Development work.

For 13th Cargo Berth: Kandla Port vide letter dt. 23/03/2011 has informed to MoEF , New Delhi and Regional Office Bhopal stating that KPT already granted Award of Concession to M/s. RAS Infraport for 13th cargo berth on 15/3/2011. For 14th Berth: Will be intimated in due course For 15th Cargo Berth: KPT vide letter dated 29/09/2011 informed MoEF,New Delhi & Regional Office,Bhopal regarding award of concession granted to M/s JRE Infra Port on 27/09/2011. For 16th Berth: KPT vide letter dated EG/WK/4600(EC)/part 301 dated 01/10/2012 informed MoEF,New Delhi & Regional Office,Bhopal regarding award of concession granted to M/s PSL Infrastructure and Port Pvt. Ltd. on 29/09/2012

10 The above mentioned stipulations will be enforced among others under the water (Prevention and Control of Pollution) Act, 1974, the Air (Prevention and Control of Pollution) Act, 1981, the Environment (Protection) Act 1986, the Hazardous Chemicals (Manufactures, storage and Import) Rules, 1989, the Coastal Regulation Zone Notification, 1991 and its subsequent amendments and the Public Liability Insurance Act, 1991 and the Rules made there under from time to time. The project proponents shall also ensure that the proposal complies with the provisions of the approved Coastal Zone Management Plan of Gujarat State.

Point Noted.

Page 54: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

Monitoring the implemental Safe guards Ministry of Environment & Forests

Regional office (W), Bhopal. Monitoring Report (Upto March 2013)

Part – 1 DATA SHEET

1. Project type : River-valley/Mining/Industry/ thermal/nuclear/Other (specify)

Multi purpose Cargo Berth (other than liquid & Container cargo).

2. Name of the project Construction of 13th to 16th Cargo Berth at Kandla Port by M/s Kandla Port Trust (Under Ministry of Shipping, GoI).

3. Clearance Letter (s). OM no and date Environment Clearance issued by Govt. of India, Ministry of Environment & Forest – New Delhi vide letter No. 11-70/2006-IA-III Dated September 08.

4. Location a) District (s) b) State (s) c) Location/latitude/longitude

Kandla Port Trust Gandhidham-Kutch Gujarat In continuation with existing 12 Cargo berths.

5. Address for Correspondence a) address of Concerned Project Chief

Engineer(with pin code & telephone/telex/fax numbers b) Address of Executive project

Engineer/manager/(with pin code fax numbers)

Kandla Port Trust, A.O. Building Post Box No.-50, Gandhidham- Kutch. Pin – 370201 Tel : 02836-233192, Fax-02836-220050. Office of the Superintending Engineer (C-I) Nirman Building, Room No. 110, New Kandla (Kutch) pin 370 210.

6. Salient features of the project b) Salient features of the Environmental

management plan

The dimension of each berth will be 300m x 55m consisting of quay and transit area resting on 1200mm and 1000mm R.C.C. bored cast-in situ piles. (Total be 1200m x 55m wide for 4 berths) The berth will be designed for a live load of 5T/m2 for loading. The back up area of size 21.7 Hectares/berth (Total area required will be 102.17 Hectares) will be developed by murrum filling. The work includes, capital dredging, custom fencing wall, electrification, water supply and fire fighting lines and Environmental measures also. NIOT, Chennai had already suggested Environmental Management Plan for both construction & operation face of the project and sighed in EIA study report. The details of existing EMP of KPT are furnished as under: The work of monitoring of environmental

parameter of kandla port e.i water quality and air quality had been awarded to NIO Goa for a futher period of one year and result had shown that the various parameters were within the tolerable limit.

Kandla Port Trust had entrusted the work of Establishment of its Environmental Monitoring Laboratory (EML) with the equipments, chemicals and glassware to NIO, Goa completion of all formalities for installation

Page 55: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

of the same at Kandla Port Trust’s environmental monitoring laboratory at cost of Rs. 1.5 lakhs. The installation of equipments, chemicals, glassware etc. was completed by N.I.O Goa is Rs. 29.25 lakhs and equipments, chemicals, glassware etc. in the month of June – 2006.

K.P.T. had awarded the work of manning operation and maintenance of EML at a cost of Rs. 4.8 lakhs per year and analysis of samples for assessment of some of the environmental parameters at a cost of Rs. 2 lakhs per year to RRL, Thiruvananthapuram on nomination basis for a period of 5 years.

K.P.T. had awarded the work of Preparation of waste management plan to Regional Research Laboratory, Thiruvananthapuram with amount of Rs. 9.20 lakhs.

Waste management Plan already prepared by RRL, Thiruvananthapuram and its recommendations are under implementation stage.

Construction of emergency response center completed on 30/4/2004.

K.P.T had awarded the work of removal of sludge, waste oil, Dirty Ballast, scrap, garbage etc. from vessels calling at Kandla Port through various firms.

KPT had regularly carried out Environmental Auditing every year as per the directions of GPCB. KPT had already submitted Environmental Audit report for the year 2010, 2011 and 2012 to GPCB through recognized (Schedule I auditor of Gujarat Pollution Control Board) and the Environmental parameters are within prescribed limit. Further, for the year 2013, environmental auditing is under progress.

KPT had awarded the work of preparation of oil spill contingency plan for proposed SPM at Veera to NIO, Goa. NIO, Goa has submitted the risk assessment report in July, 2012.

Further, KPT had signed MOU with Public Sector Oil Companies IOC, BPCL, HPCL for updating of existing Oil Spill Contingency Plan at Kandla.

7. Break up of the project area a) Submergence area : forest & non-forest b) Others

Nil Nil

8. Break up of the project affected population with enumeration of those losing houses/dwelling units only agricultural land & landless labourers/artisen

a) SC. ST/Adivasis b) Others (please indicate whether these figures are based on any scientific and systematic

Nil Nil Nil

Page 56: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

survey carried out of only provisional figures, if a survey is carried out give details and years of survey).

It is based on the EIA report prepared by M/s NIOT, Chennai.

9. Financial details a) Project cost as originally planned and

subsequent revised estimates and the year of prices reference

b) Allocation made for environmental

management plans with item wise and year wise break-up

c) Benefit cost ratio/Internal rate of

Return and the year of assessment Whether (c) includes the cost of

environmental management plans so far.

d) Actual expenditure incurred on the

project e) Actual expenditure incurred on the

environmental management plans so far.

Block estimated cost of Rs. 442.90 crores (Dec. 2005) Revised Block estimated cost of Rs. 755.5 crores (Apr 2009) Rs. 65.00 lakhs in R.B.E 10-11 Rs. 43.00 lakhs in B.E 12-13 FIRR EIRR 13.61% 14.62% Yes For 13th to 16th Cargo berths through internal Resources of KPT: 1.02 Crores. BOT operator 13th C.B:281.91 crores. BOT operator 14th C.B: NIL BOT operator 15th C.B :154.51 crores BOT operator 16th C.B:27.44 crores. For the year 2010-2011 -Rs12.7 For the year 2011-2012 -Rs 33.25 For the year 2012-13 - ---- Lakhs

10. Forest land requirement a) The status of approval for diversion of

forest land for non-forestry use

b) The status of clear felling c) The status of compensatory

afforestation, if any d) Comments on the viability & sustainability of compensatory afforestation programme in the light of actual field experience so far

Nil Nil- Not related. NIL

A) Mangrove Plantation Plan carried out:

1) Year 2005-06 – 20 hectares 2) Year 2008-09 - 50 hectares 3) Year 2010-11 – 100 hectares 4) Year 2011-12 – 200 hectares 5) Year 2012-13 – 300 hectares Total - 670 hectares

B) Mangroves Plantation in an area of 330 hectares is in progress through Forest Department, GOG.

Mangroves Plantation has successfully carried out in an area of 670 hectares till date and 330 hectares is in progress.

11. The status of clear felling in non-forest areas (such as submergence area of reservoir, approach roads), if any with quantitative information.

Nil

Page 57: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

12. Status of construction a) Date of commencement (Actual and/or

planned) b) Date of completion (Actual and/or

planned)

Project construction activity started on 23/03/2011 for 13th Cargo Berth by M/S RAS Infra Port Pvt.Ltd. Project construction activity likely to be stated in July, 2013 for 14th Cargo Berth by M/S Royal Maritime Handlers Pvt. Ltd. Project construction activity started on 27/09/2011

for 15th Cargo Berth by M/S JRE Infra Pvt. Ltd. Project construction activity started on 29/09/2012 for 16th Cargo Berth by M/s PSL Infrastructure and Port Pvt. Ltd. For 13th Cargo Berth: Work completed. For 14th Cargo Berth: Schedule date of completion is March 2015. For 15th Cargo Berth: Schedule Dated of Completion is 26/09/2013. For 16th Cargo Berth: Schedule Dated of Completion is 28/09/2014.

13. Reasons for the delay if the Project is yet to start

13th Cargo Berth – Work completed & commercial Operation started on 01/02/2013

(M/s RAS Infraport Pvt Ltd.)

14th Cargo Berth – Work likely to be started in JULY, 2013

(M/s Royal Maritime Handlers Pvt. Ltd.)

15th Cargo Berth – Work in Progress

(M/s JRE Infra Pvt Ltd.)

16th Cargo Berth– Work in Progress

(M/s PSL Infrastructure and Port Pvt. Ltd.)

Date of site visited a) The dates on which the project was

monitored by the regional office on pervious occasion. if any

b) The date site visit for this monitoring report.

--------------- ---------------

Page 58: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt
Page 59: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt
Page 60: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt
Page 61: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt
Page 62: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt
Page 63: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt
Page 64: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

Environmental and CRZ clearance for construction of berthing & allied facilities off Tekra near Tuna, Gujarat by

Kandla Port Trust – Reg. Dated – 12/04/2013 Conditions

5. Specific Conditions: Action

i) Consent for establishment shall be obtained from State Pollution control board under Air and Water Act and copy shall be submitted to the Ministry before start of any construction work at the site.

NOC had already been obtained from Gujarat State Pollution Control Board vide letter dated 28th July, 2009

ii) Scientific study shall be carried out by some expert and organization like BHNS focusing among other thing the marine environment and general and the preservation of the mangroves in particular against any possible adverse impact due to creation of the proposed activities.

KPT had already submitted the report of scientific studies carried out by M/s Gujarat Institute of Desert Ecology, Bhuj vide letter No. EG/WK/4604 (EC)/part dated 06/09/2012 to MoEF, GOI.

iii) Proponent shall explore the possibilities of plantation of mangroves in the entire mud flat area and submit the action plan to the the Ministry prior to the commencement of the activity.

A) Mangrove Plantation Plan carried out:

1) Year 2005-06 – 20 hectares

2) Year 2008-09 - 50 hectares 3) Year 2010-11 – 100 hectares 4) Year 2011-12 – 200 hectares

5) Year 2012-13 – 300 hectares Total - 670 hectares

B) Proposed Mangrove Plantation:

Mangroves Plantation in an area of 330

hectares is in progress through Forest Department, GOG.

iv) The dredge material shall be reused for low level rising wherever possible and excess shall be dumped into sea at the designated dumping areas identified based on mathematical model studies.

Point Noted

v) Though the project proponent has carried out EIA for individual components and it were examined by the committee before the issue of clearance, it is suggested that proponent shall update and submit comprehensive EMP to the Ministry and Regional office of the Ministry

KPT has already submitted by BOT operator the Comprehensive EMP to the Ministry and Regional office of the Ministry at Bhopal vide letter No. EC/WK/4604 (EC)/ part dated 12/04/2013.

Page 65: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

Conditions

at Bhopal prior to commencement of the activity.

vi) The Project Proponent shall set up separate environmental management cell for effective implementation of the stipulated environmental safeguard under the supervision of senior Executive.

Kandla Port has strengthened the Environment Cell by appointing two Environment Experts from M/s Netel India Pvt. Ltd.

vii) The funds earmarked for environmental management plan shall be included in the budget and this shall not be diverted for any other purpose.

Point Noted.

The B.E. of Kandla Port for the year 2012-2013 under the scheme of “General Environment Programme” was Rs.150.00 Lakhs in B.E. and upto date expenditure incurred Rs. 92.6 Lakhs.

Kandla Port has kept Rs.150.00 Lakhs in B.E. 2013-2014 under the scheme of “General Environment Programme”.

6. General conditions:

i) Appropriate measures must be taken while undertaking digging activities to avoid any likely degradation of water quality.

Point Noted

ii) Full support shall be extended to the officers to the Ministry Regional Officers at Bhopal and the officers of the Central and State Pollution Control Boards by the Project Proponents during the inspection for monitoring purposes, by furnishing full details and action

plans including the action taken reports in respect of mitigative measures and other environmental protection activities.

Point Noted

iii) A six monthly monitoring report shall need to be submitted by the project proponents to the Regional Office at this Ministry at Bhopal regarding the implementation of the stipulated conditions.

KPT regularly submitted the six monthly Monitoring Report to Regional Office, Bhopal of MoEF, GOI

Complied

iv Ministry of Environment and Forest or any other competent authority may stipulate any additional or modify the existing

Point Noted

Page 66: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

Conditions

ones, if necessary in the interest of environment and the same shall be complied with.

v) This Ministry reserve the right to revoke this clearance, if any of the conditions stipulated are not complied with to the satisfaction of the Ministry.

Point Noted

vi) In the event of a change in project profile or change in the

implementation agency, a fresh reference shall be made to the ministry of environment and forest.

Point Noted

vii) The project proponent shall inform the Regional Office at Bhopal as well as the Ministry the date of financial closure and final approval of the project by the concerned authorities and the date of start of Land Development Work.

KPT vide letter No. EG/WK/4604(EC)/562 dated 26/12/2012 had already informed MoEF, GOI.

viii) A copy of the clearance letter will be marked to the concerned panchayat / local NGO, if any, from whom any suggestions / representation has been received while processing the proposal.

N/A

ix) The State pollution Control Board shall display a copy of clearance letter at the Regional Office, District Industries Centre and Collectors office / Tehsildars office for 30 days.

N/A

7) These stipulations would be enforced among others under the

provisions of water (prevention and control of pollution) Act 1974, Air (prevention and control of pollution) Act 1981 the environment (protection) act, 1986, the public liability (insurance) act, 1991 and EIA notification 1994, including the amendments and rules made thereafter.

Point Noted.

8) All other statutory clearances such as the approvals for storage diesel from Chief Controller of explosive, Fire department, civil aviation, forest conservation

Point Noted

Page 67: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

Conditions

Act,1980 and wild life protection act,1972 etc. shall be obtained , as applicable by project proponent from the respective competent authorities.

9) The project proponent shall advertise in at least two local news papers widely circulated in the region, one of which shall be in the vernacular language informing that the project has been accorded

environmental clearance copies of clearance letters are available with the state Pollution Control Board and may also be seen at website of the Ministry of Environment & Forest at httpt//www.envfornic.in. The advertisement shall be made within 10 days from the date of the issue of the clearance letter and a copy of the same should be forwarded to the Regional Office of this Ministry at Bhopal.

Complied and news paper cuttings already sent to Regional office, Bhopal of MoEF vide letter No. : EG/WK/4604(EC)/1036 dated 25/11/2011

10) Environmental clearances is subject to final order of the Hon’ble Supreme Court of India in the matter of Goa Foundation Vs. Union of India in Writ Petition (Civil) No. 460 of 2004 as may be applicable to this project.

Point noted

11) Status of compliance to the various stipulated environmental conditions and environmental safeguards will be uploaded by the project proponent in the website.

Point Noted

12) A copy of the clearances letter shall be send by the proponent to the concerned Panchyat, Zila Parishad/Municipal Cooperation, Urban local body and the local NGO, if any, from whom suggestion/ representation if any where received while processing the proposal. The clearance letter shall also be put on the website of the company by the proponent.

N/A

13) The proponent shall upload the

status of compliance of the stipulated environmental condition,

Point noted

Page 68: KANDLA PORT TRUSTKANDLA PORT TRUST Administrative Office Building Post Box NO. 50 GANDHIDHAM (Kutch). Gujarat: 370 201. Fax: (02836) 220050 Ph.: (02836) 233192 wmar. ka nd la po rt

Conditions

including result of monitored data on their website and shall update the same periodically. It shall simultaneously be send to the regional office of MoEF, the respective Zonal office of CPCB & the SPCB.

14) The environmental statement for each financial year ending 31st march in form V as is mandated to be submitted by the project

proponent to the concerned SPCB as prescribed under the environmental (protection) rules, 1986, as amended subsequently shall also be put on the website of the company along with the status of the compliance of EC condition and shall also be send to the respective regional offices of MoEF by email.

Point noted