kaplan international college

4
A series of refurbishment and alteration projects leading to the vacating of most of level 3P and some of level 2P to allow the opening of the new College Major alterations and refurbishments to 2Q & 3Q to provide up to date if not state of the art labs and teaching spaces as well as offices for relocating staff. Related works in N block to upgrade offices relocate staff and provide new specialist IT and lab spaces Works to R Block to create replacement workshops and IT improvements etc Kaplan International College

Upload: john

Post on 23-Feb-2016

35 views

Category:

Documents


0 download

DESCRIPTION

Kaplan International College. A series of refurbishment and alteration projects leading to the vacating of most of level 3P and some of level 2P to allow the opening of the new College - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Kaplan International College

A series of refurbishment and alteration projects leading to the vacating of most of level 3P and some of level 2P to allow the opening of the new College

Major alterations and refurbishments to 2Q & 3Q to provide up to date if not state of the art labs and teaching spaces as well as offices for relocating staff.

Related works in N block to upgrade offices relocate staff and provide new specialist IT and lab spaces

Works to R Block to create replacement workshops and IT improvements etc

Kaplan International College

Page 2: Kaplan International College

After

Before

Kaplan International College - P Block

Page 3: Kaplan International College

Q Block

2Q24 Games Lab2Q7/8

After

Before

2Q7/8

Page 4: Kaplan International College

N Block

Before

After