karya makmur abadi pom - intranet.klk.com.my · progress report on (11th month of financial year)...
TRANSCRIPT
Date 09-10-2015
KARYA MAKMUR ABADI POM
.(Arvin Sanggarin)
Manager
(No. Syarikat: 15043-V)
KARYA MAKMUR ABADI POM
Progress Report
For the month ofAGUSTUS 2015
KUALA LUMPUR KEPONG BERHAD
PAGE 1
HIGHLIGHTSEstimated percentage of FFB pushed by shovelPercentage FFB pushed due to grading
PRODUCTION
RAINFALL RECORD (mm) Year 2015
Fin Year Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug SepLast FYThis FY
OTHER HIGHLIGHTS
DESCRIPTION OF PROBLEMS / ACHIEVEMENTS
Comments :- OER meningkat 0,75 %- KER turun 0,29 %
PROGRESS REPORT ON
(11TH MONTH OF FINANCIAL YEAR)FOR THE MONTH OF AGUSTUS 2015
KARYA MAKMUR ABADI POM
Todate Current Financial Year Same Period Last Year
2.752.91
Last Month TodateThis Month
ITEM
O.E.R %
K.E.R %
This Month
2.62
23.9024.69 23.94
PAGE 2
1 PRODUCTION REPORT
1.1. FFB STATEMENT
1.1.1. FFB CONTRIBUTION
Estimate for Estimate +/- Estimate +/- EstimateThis Month Todate This Month Todate This Month Todate
KLK Estates MT MT MT MT MT MT5,219.380 8,882.230 7,399.000 7,399.000 -29.46% 20.05%2,119.910 4,201.160 3,653.000 3,653.000 -41.97% 15.01%
- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -
Sub Total 7,339.290 13,083.390 11,052.000 11,052.000 -33.59% 18.38%
Non-KLK Estates- -- -- -- -- -- -- -- -- -- -- -
Sub Total - - - - - -
Estimate for Estimate +/- Estimate +/- EstimateThis Month Todate This Month Todate This Month Todate
Outsiders MT MT MT MT MT MT- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -
KMA SELATANKMA TENGAH
- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -
Sub Total - - - - - -
Grand Total 7,339.290 13,083.390 11,052.000 11,052.000 -33.59% 18.38%
Comment :- total FFB proses 7.339,290 mt kurang dari estimate sebanyak - 33,59 %
PAGE 31.1.2. FFB COMPOSITION
Composition of crop from various years of planting are :-
MT % MT %2008 19,638.70 78.70 3,613.32 27.94 2009 5,043.98 20.21 8,832.19 68.29 2010 100.59 0.40 188.84 1.46 2011 3.23 0.01 3.23 0.02 2012 166.90 0.67 295.73 2.29
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Total 24,953.40 100.00 12,933.31 100.00
Append below the classification of Palms According to Age :-Category Palm Age (years) TM % TD %
Immature 1st - 3rd 1% 2%Young 4th - 9th 99% 98%Prime 10th - 18th 0% 0%Old 19th and above 0% 0%Comments :
This Month TodateYear of Planting
Remarks
- 98 % buah yang diterima kategori young- 2 % sisa nya kategori immature
1.1.3. FFB QUALITY
KLK This Last This Last This Last This Last This Last This Last This Last This LastESTATES Month Month Month Month Month Month Month Month Month Month Month Month Month Month Month MonthKMA SELATAN 0.00 0.04 2.31 2.29 9.70 0.42 2.00 1.83 0.00 0.04 0.00 0.00 0.00 0.00KMA TENGAH 0.00 0.00 2.32 4.08 14.33 1.30 2.48 4.17 0.08 0.46 0.00 0.00 0.00 0.00
average 0.00 0.02 2.32 3.19 12.02 0.86 2.24 3.00 0.04 0.25 0.00 0.00 0.00 0.00Total/Average 0.00 0.00
NON-KLK This Last This Last This Last This Last This Last This Last This Last This LastESTATES Month Month Month Month Month Month Month Month Month Month Month Month Month Month Month Month
Total/Average 0.00 0.00
This Last This Last This Last This Last This Last This Last This Last This LastOUTSIDERS Month Month Month Month Month Month Month Month Month Month Month Month Month Month Month Month
Total/Average 0.00 0.00
1.1.4. % FFB ON FLOOR AND IN LOADING RAMP FOR GRADING
FFB INTAKE (MT) % %
Comments :
% Empty Bunch
No. of Grading % Black % Underripe
No. of Grading
% Rotten
% Overnight
% Empty Bunch
% Black % Underripe % Rotten % Long Stalk % Pest Damaged
% Overnight % Long Stalk % Pest Damaged
WEIGHT (MT)LOADING RAMP
WEIGHT (MT)FFB GRADING
- kebun tidak mengirim black bunch- Under ripe mengalami penurunan sebesar 0,87%- overnight mengalami peningkatan sebesar 11,16 %
PAGE 4
No. of Grading % Black % Underripe % Long Stalk % Empty Bunch% Rotten % Pest Damaged% Overnight
1.1.5. LOOSE FRUIT & TRASH CONTENT
This Last This Last This Last This LastNO ESTATES Month Month Month Month Month Month Month Month
1 KMA SELATAN 2.91 0.55 2 KMA TENGAH - - 3456789
101112
Average 0 0
NO Outsider Estate123456789
101112131415
Average 0 0
1.1.6. LOOSE FRUITS TO FFB RATIO
NO ESTATES12345678
AverageNO Outsider Estate
- -
Fruit in Load Loose Fruit (%) FFB %
% to FFB
PAGE 4.1
No. of Grading % Loose Trash Content in Trash Content in
This Month Last MonthTotal Tonnage
This Month Last Month
12345678
Average
1.1.7. STONES & TRASH IN FFB
NO ESTATES12345678
Comments :- looses fruit dari KMA Selatan mengalami peningkatan sebanyak 2.36%
-
TrashTonnage (mt) % to FFBStones (kgs) per 100 tn FFB
-
PAGE 5
1.2. PRODUCTION QUALITY
1.2.1. PRODUCTION OIL / DESPATCH OIL
X S.D. X S.D. X S.D. X S.D.
FFA %
Moisture (VM) %
Dirt %
Peroxide Value %
DOBI
ANALYSIS RESULT BY (KDC/TQCC)
TaikoSAMPLE Average StandardFFA 3.0 MaxVM 0.13 MaxDIRT 0.03 MaxPEROXIDE VALUE 0.60 MaxIODINE VALUE 50 - 54DOBI VALUE 3.0 MinCAROTENE 600 MinE233 (1% CORR.) 1.20 MaxE269 (1% CORR.) 0.20 MaxIRON 5.0 - 3.0PHOSPHORUS 8.0 - 5.0D.F. (Delta Y) 20.0 MinQUALITY RATING NIL
Comments :
- Moisture 0.24 %
0.09
- FFA produksi 4.99 % mengalami peningkatan sebesar 0.54%
0.000
< 0.25
> 2.31
1st Week 2nd Week 3rd Week
0.24
0.022
0.04
0.030
0.27
4th Week
0.020
0.25 0.02
0.011
DESPATCH PRODUCTIONThis Month Last Month This Month Last Month
0.005
5.17 0.24
Marketing
< 5.0
Specification
4.99 0.60 4.45 0.21
PAGE 61.2.2. PRODUCTION / DESPATCH KERNEL
MARKETINGX S.D. X S.D. X S.D. X S.D. SPECIFICATION
6.12 0.70 7.03 1.04 4.51 0.00 6%5.19 0.74 3.97 0.58 5.07 0.00 7%1.81 0.09 1.70 0.14 4.62 0.00
23.67 1.92 26.73 1.030.37 0.06 0.52 0.13 0.47 0.00
1.2.3. CPO DESPATCHBUYER MILL BUYER'S + / -
NET NET ON MILLWEIGHT WEIGHT NET WEIGHT
tn tn tn1- 912.570 911.990 -0.5802- 0.0003- 0.0004- 0.0005- 0.0006- 0.0007- 0.0008- 0.0009- 0.000
10- 0.000 912.570 911.990 -0.580
1.2.4. PK DESPATCHBUYER MILL
NETWEIGHT
tn1- 24.5302- 3- 4-5-6-7-
Total : 24.530
1.2.5. CXC REPORT
Comments :
DIRT %FFA %TOTAL BROKEN KERNEL %STONE CONTENT %
- moisture dried kernel 6.12 %
THIS MONTH
DESPATCHTHIS MONTH LAST MONTH
No. of loads with the weight shortage of 80kg and above0
PRODUCTIONLAST MONTH
MOISTURE %
THIS MONTH
LAST MONTH
- dirt 5.19 %
Total CPO tankers dispatched with active GPS (A)
Total CPO tankers dispatched with no GPS installed (C)Total CPO tankers dispatched with non-active GPS (B)
Total number of CPO tankers dispatched (A+B+C) 0
PAGE 6.1
LOADS FROM MONTH: Agustus 2015
Ticket No Driver Vehicle Date Mill Buyer Loss (A) Buyer
Total 0.000 0.000 0.000* Chargeable to transporters when (A) - (B) is above 80kg. Quantity chargeable is net after minus the limit of 80kg.
Comments
EXTRACTED FROM CXC REPORTCPO Despatch Loads With Weight Shortage of 80kg and Above
Actual oil recovered (MT) at Mill
(B)
Weight Details (MT) Tanker with GPS
Charges to the
transporters (MT) *
PAGE 6.2
No. Tanker number Date Time Action Taken / RemarksNett Weight diff. with buyers (+/-) (MT)
Total 0.000
GPS VIOLATION REPORT FOR KARYA MAKMUR ABADI POM ON Agustus 2015On Exit the Zone Grid of Authorized Route during CPO delivery to Buyers Only
PAGE 71.3. COST OF PRODUCTION
(Basis : Cost per tonne CPO)
ThisMonth Todate Year ' s
Agustus 2015 11 mths EstimateRM / tn RM / tn RM / tn
Indirect Cost 77.42 97.02 85.19
Depreciation 336.22
Manufacturing Cost 166.47 268.18 152.79
Ex-Mill Cost 243.89 365.20 574.20
Cooking Oil Cess
Palm Oil Stabilisation Cess
CPO (Sabah) Sales Tax
Despatch & Selling 10.30
TOTAL EXPENDITURE 243.89 365.20 584.50
A/c This Month Estimate
Code RM/ton CPO RM/ton CPO Diff. (%)
IC 04 1.70 5.23 -208.6%IC 08 2.79 3.53 -26.4%IC 12 5.04 2.50 50.4%IC 14 1.94 2.78 -43.2%IC 19 6.77 4.23 37.5%
PK 41 0.74 2.24 -200.8%PK 42 10.38 10.92 -5.2%PK 45 17.67 3.01 83.0%PK 46 6.01 3.00 50.0%
PK 47 14.59 4.29 70.6%PK 50 4.90 11.13 -127.1%PK 51 5.21 4.01 23.2%PK 63 34.24 12.37 63.9%
Comments :
Chemical Effluent
Workshop charge and Workshop equipment
over time for supervisorLabour wages
Packing door steriliser dan blowdonchamber
Comments
Biaya operasional kantorSecurity expense
Independence Day
BPJSPembelian peralatan pantry
Water Treatment dan Timbun wadukCleaning tools dan Mill roads
Dump Truck running cost
PAGE 82 PROCESS PERFORMANCE
2.1. STERILIZATION
Summary of sterilisation cycle for the month is tabulated as follows :-
Function X (min) S.D.Deaeration 2 01st. Peak (1,7 Bar / 24,65 psi) 15 01st. Peak exhaust 3 02nd. Peak (2,5 Bar / 36,25 psi) 10 02nd. Peak exhaust 3 03rd. Peak (2,75 Bar / 39,87 psi) 10 03rd. Peak exhaust - -4th. Peak (0 Bar / 0 psi) - -Holding Time 45 0Final exhaust 8 0Steaming cycle 96 0Door Open to Door Shut Time 125 0
X S.D. X S.D.USB after 1st Threshing (%) 0.56 0.17 0.43 0.11USB after 2nd Threshing (%) 0.16 0.09 0.16 0.17Threshing Efficiency (%) 69.28 17.68 63.28 31.35
STERILIZER CONDENSATE
This Month Last MonthX S.D. X S.D.
6.64 1.44 8.13 2.35
Condensate / FFB Ratio
Absolute oil loss (kg/tn FFB)
Comments :
Last MonthThis Month
Steriliser condensate (Oil Content in Wet Basis)
- USB final dibawah 1 %
PAGE 9.02.2. DIGESTING & PRESSING STATION
2.2.1. DIGESTER TEMPERATURE OC
This Month Last Month DIGESTER X S.D. X S.D. Digester No. 1 85.00 4.08 90.00 0.00 Digester No. 2 85.67 4.03 90.00 0.00 Digester No. 3 86.33 3.86 90.00 0.00 Digester No. 4 83.33 2.36 90.00 0.00 Digester No. 5 Digester No. 6 Digester No. 7 Digester No. 8 Digester No. 9 Digester No. 10 Digester No. 11
2.2.2. PRESSING
Press Press Press Press Press Press Press Press Press Press Press AverageNo. 1 No. 2 No. 3 No. 4 No. 5 No. 6 No. 7 No. 8 No. 9 No. 10 No. 11
X 4.09 4.21 4.32 4.37 4.25S.D. 0.27 0.24 0.28 0.10 0.22
X 6.28 4.63 4.47 4.61 5.00S.D. 0.94 0.93 0.94 0.91 0.93
X 6.75 6.89 7.06 7.29 7.00S.D. 0.36 0.60 0.57 0.32 0.46
X 10.18 7.54 7.25 7.33 8.08S.D. 1.62 1.84 1.68 1.74 1.72
X 14.42 14.36 13.64 11.98 13.60S.D. 1.77 2.20 2.87 0.98 1.96
X 13.65 13.57 13.43 12.75 13.35S.D. 1.57 2.49 2.70 1.75 2.13
X 98.34 119.95 87.76 26.38 83.11S.D.
X 31.64 101.80 80.54 44.80 64.70S.D.
Comments :
This Month
Last Month
This Month
Last Month
OIL LOSS ON DRY BASIS (OLDB)
NUT BREAKAGE (%)
PRESS RUNNING HOURS
This Month
Last Month
This Month
Last Month
OIL LOSS ON WET BASIS (OLWB)
- OLDB press average 7.00 %, Standard 8 %- Broken nut average 13.60 %, Standard 15 %
PAGE 9.12.2.3.
This Month
Last Month
This Month
Last Month
This Month
Last Month
This Month
Last Month
This Month
Last Month
This Month
Last Month
This Month
Last Month
This Month
Last Month
XS.D.N
True Nut TrashTrue Mesocarp (ripe)
True Mesocarp (unripe)
Oil in Mesocarp OLWB Normal Parthenocarp
Abnormal Partnenocarp
2.2.4. EFB PRESSING
Press Press Press Press SuperNo. 1 No. 2 No. 3 No. 4 Press 1
PRESS RUNNING This Month 116.65 127.91 111.63 HOURS Last Month 102.86 105.03 114.25 DOWN TIME This Month
Last Month
2.2.5. OIL RECOVERED
This Month F F A (%) DOBI
VM (%)OLWB (%)
Press Fibre (OLDB) Ratio EFB Liquor to FFB (%)
2.2.6. SPLITTER
RUNNING HOURSThis Month Last Month
No. 1 No. 2
Comments :
Last Month
PAGE 10
2.3. CLARIFICATION STATION
2.3.1. CLARIFICATION TANK
Tank 1 Tank 2 Tank 3 Tank 4 Tank 1 Tank 2 Tank 3 Tank 4X 90.73 91.93 90.00 90.00
S.D 2.38 1.84 0.00 0.00 % Oil in underflow X 7.45 7.99 9.09 7.78 (% OLWB) S.D 1.06 0.92 1.86 0.61
2.3.2. SLUDGE SEPARATOR (S) / CENTRIFUGE (C)
S1 S2 S3 S4 C1 C2 C3 C4 C5 C6 C7 C8X 0.95 1.02 1.01 0.99
S.D 0.25 0.33 0.37 0.32X 1.24 0.96 1.32 1.23
S.D. 0.48 0.29 0.49 0.44T Mth X 106.46 106.00 97.89 85.82L Mth X 97.26 79.63 48.68 64.73T Mth XL Mth XT Mth XL Mth XT Mth XL Mth X
Comments :
This Month Last Month
Separate Waste Basculator (mt)
Oil losses on Absolute Terms (Kg/tn FFB)
- average OLWB separator 0.99%
Temperature OC
This MonthLast
Month
% Oil loss on wet basis (x)
Operating Hours (hrs)
Nozzle size (mm)
PAGE 11
2.3.2. DECANTER (D)
Inlet
D1 D2 D1 D2 D1 D2X
S.DX
S.D.X
S.DX
S.D.X
S.DX
S.D.T Mth XL Mth X
Comments :
Solid Phase
Last MonthTemperature (oC)
Operating Hours
Light Phase
Oil % (x)
Heavy Phase
This MonthLast
Month
This Month
This MonthLast
Month
VM % (x)
This MonthLast
Month
NOS % (x)
PAGE 12
2.3.3. DILUTION RATE & ABSOLUTE OIL LOSS
X S.D. X S.DDILUTION RATE % 26.80 2.34 28.73 8.16Separator Waste to FFB ratioDecanter cake to FFB ratioAbsolute Oil loss in Separator/Centrifuge kg/mt FFBAbsolute Oil loss in Decanter Cake kg/mt FFBTotal Oil loss kg/MT FFB 0.00 0.00 0.00 0.00
2.3.4. OIL LOSSES AFTER DEOILING TANK TO EFFLUENT
DescriptionAfter Deoiling tank (OLWB)After Cooling pond
Comments :
This Month Last Month
This Month Last Month
- Oil looses final effluent 0.98 (OLWB)
0.98 1.13
PAGE 13
2.3.5. PURIFIER & VACUUM DRYER
No: 1 No: 2 No: 1 No: 2 No: 3 No: 4 No: 5X 0.75 0.51
S.D 0.09 0.09X 1.05 0.69 0.61
S.D. 0.24 0.20 0.12X 0.04 0.02
S.D 0.01 0.00X 0.06 0.03 0.02
S.D. 0.02 0.02 0.01X 90.99
S.D 7.53X 43.97 40.75
S.D. 25.89 13.10X 31.37
S.D 10.81X 31.41 57.81
S.D. 13.58 16.35
2.3.6. VACUUM DRYER
X S.D X S.D X S.DThis Month 69.33 3.48 0.58 0.08 0.24 0.04 57.57Last Month 70.00 0.00 0.77 0.29 0.27 0.09 61.98This MonthLast MonthThis MonthLast Month
Comments :
% Dirt
This MonthLast
Month
PURIFIER After PurifierBefore Purifier
% VM
This MonthLast
Month
VM Rem. Eff
This MonthLast
Month
Dirt Rem. Eff
This MonthLast
Month
- Moisture after vacuum dryer 0.24 %
VACUUM DRYER Vacuum (-cm Hg) VM % After DryerVM % Before DryerVM.
Removal Eff.
No: 1
No: 2
No: 3
- VM removal efficiency 57.57 %
2.4. NUT & KERNEL STATION PAGE 13.1
2.4.1. NUT SILO & KERNEL SILOS
DESCRIPTION No: 1 No: 2 No: 3 No: 4X
S.DX
S.D.X
S.DX
S.D.X
S.DX
S.D.
2.4.2. KERNEL SILO
1 2 3 4 5 1 2 3 4 5Top
Middle 80.86 82.17 82.20 80.00 80.00Bottom
% VM Fresh Kernel X 21.53 21.59 23.03 21.98 22.64S.D 1.00 0.96 1.25 0.82 0.79X 6.00 5.99 6.00 5.88 5.47
S.D 0.61 0.98 0.60 0.44 0.51% Drying Efficiency 72.52 72.21 74.56 73.24 75.87
Comments :
This MonthLast
Month
- Drying efficiency average 73.10 %
This Month Last Month
% Drying Efficiency
% Dried Kernel
Temperature oC
% VM Fresh Nut
This MonthLast
Month
% Dried Nut
This MonthLast
Month
2.4.3. NUT CRACKING EFFICIENCY PAGE 13.2
X SD X SD X SD X SD X SD X SD X SD X SD X SD X SD X SDWhole Nut (%)Broken Nut (%)Whole Kernel (%)Brokern Kernel (%)
X SD X SD X SD X SD X SD X SD X SD X SD X SD X SD X SDWhole Kernel (%) 15.05 0.54 15.09 0.47 16.03 1.24 15.06 0.99Broken Kernel (%) 23.42 1.35 22.30 0.76 21.70 1.40 23.34 2.12Uncracked Nut (%) 0.76 0.33 0.28 0.03 0.80 0.44 0.31 0.09Half cracked Nut (%) 1.11 0.24 1.28 0.44 1.32 0.33 1.36 0.25
X SD X SDRipple Mill No: 1 98.29 0.44Ripple Mill No: 2 98.55 0.38Ripple Mill No: 3 98.14 0.50Ripple Mill No: 4 98.39 0.29Ripple Mill No: 5Ripple Mill No: 6Ripple Mill No: 7Ripple Mill No: 8Ripple Mill No: 9Ripple Mill No: 10Ripple Mill No: 11
Comments :
No: 6 No: 7 No: 10 No: 11No: 8 No: 9No: 2 No: 3 No: 4 No: 5Mixture Composition after Cracker
No: 1
Nut Cracking Eff.
Kernel Recovery Eff.
- Nut cracking Eff 98.34%
R I P P L E M I L L
R I P P L E M I L L
No: 1 No: 2 No: 3 No: 8 No: 9 No: 11Nut Composition before Cracker (INPUT)
No: 4 No: 5 No: 6 No: 7 No: 10
PAGE 142.4.4. KERNEL LOSSES / COST
X SD X SD X SD X SD X SD X SD
1.05 0.39 1.92 0.34 1.09 0.19 1.06 0.20
1st Stage
2nd Stage
1st Stage
2nd Stage
1st Stage
2nd Stage
1st Stage
2nd Stage
1st Stage
2nd Stage
1st Stage
2nd Stage
0.85 0.13 0.880 0.070 1.03 0.17 1.19 0.69
1.26 0.21 1.57 0.78
Claybath 1.53 0.87 1.26 0.58
2.4.5. RUNNING COST
Comments :
Kernel Produced (mt)Total Kaolin or Calcium Carbonate Cost (RM)Other Cost e.g Sodium Silicate (RM)
192.236
3755.33 10780.00
0.61
Last MonthThis MonthLine 3Line 1
4462.84
This Month Last Month Todate
126.344
Line 1 Line 2
23.22 33.91 32.51
Line 2 Line 3
Cost / MT of PK (RM)
Cyclone Fibre
LTDSHydrocyclone (PK in wet shell)
0.76 0.82
- hydrocyclone wet shell di recycle ke claybath
331.572
- cost kaolin 61 sen / mt FFB
Cost / MT of FFB (RM)
PAGE 152.5. BOILER / POWER HOUSE
2.5.1. BOILER HOUSE
Description This Month Last Month TodateBoiler Chemical Cost (Rupiah) Rp12,760,775.00 Rp8,245,060.00 Rp21,005,835.00 Cost / MT FFB (Rupiah) Rp7,339.29 Rp1,670.00 Rp9,009.29
2.5.2. POWER HOUSE
DescriptionThis Month Last Month This Month Last Month This Month Last Month This Month Last Month This Month Last Month
Turbines > ElliotNo. 1 (1700 KW) 156.1 132.6 87190.5 0.0No. 2 (0 KW)No. 3 (0 KW)No. 4 (0 KW)Diesel Gen Set > CumminsNo. 1 (288 KW) 400.2 422.3 31052.8 56969.6 10851.0 9600.0 77.6 134.9 2.86 5.93No. 2 (656 KW) 118.4 134.0 13731.1 55022.1 7000.0 12561.0 116.0 410.6 1.96 4.38No. 3 (0 KW)KwHr / mt FFB (Turbine + Genset)
2.5.3. TNB POWER SUPPLY
KwHr Rp KwHr Rp KwHr RpPalm Oil MillRubber FactoryEcomat PlantTotal 0.00 0.00 0.00 0.00 0.00 0.00
Comments :
This Month
Steam Consumption per KwHr (Turbine)18.0
Last Month Todate
Operating Hours Total KwH Generated Kw KwHr / LitDiesel Consumption (Litres)
PAGE 16
2.6. WATER TREATMENT PLANT
2.6.1. WATER CONSUMPTION
Description This Month Last Month This Month Last Month m3/mt FFBOwn 640.00 894.00 6.07% 13.09% 0.09Estate 1609.50 0.00 15.27% 0.00% 0.22
Mill 8290.00 5938.00 78.66% 86.91% 1.13 FCTOTAL 10539.50 6832.00 100.00% 100.00% 1.44
2.6.2. WATER TREATMENT COST
This Month Last Month TodateChemical Cost (RM) 7359.23 8037.00 15396.23Cost /m3 water (cts / m3) 0.70 1.18 1.87Cost /mt FFB (cts / mt FFB) 1.00 1.62 2.62Water Consumption (m3 / mt FFB) 1.13 1.20 2.33
2.6.3. MONTHLY LICENCE COSTPUMPING RAW WATER FROM RIVER
This Month Last Month TodateTotal Volume of water (m3) consumed 10539.50 6832.00 17371.50Total Cost (RM) 7359.23 8037.00 15396.23
Comments :
Domestic
Water consumed%
- Cost / m3 water 7 sen- Water consumption 1,13 m3/mt FFB
PAGE 17
2.7. General (Visitors / Security / Training Programme / Details of Breakdown, etc)
2.7.1. Visitation
Date
2.7.2. Training
Date03-08-201524-08-2015
2.7.3. Security
Date05-08-2015
2.7.4. OSH Matter
Date
2.7.5. RSPO Matter
Date
2.7.6. Amenities
Date
2.7.7. Water Supply
Date01-08-2015
2.7.8. EFB DISPOSAL
2.7.9. DECANTER CAKE DISPOSAL
Balance b/f (mt) Production (mt) Collected (mt) Balance c/f (mt)715.32 1,321.07 1,252.64 783.75
Balance b/f (mt) Production (mt) Collected (mt) Balance c/f (mt)
supply for estate
Remarks
Remarks
Remarks
Remarks
RemarksPerson
RemarksInternal training operatorinternal training operator effluent
Remarkskordinasi security despatch CPO
PAGE 17.1
2.8.0. Effluent Treatment
Date
2.8.1 Mill Downtime
Date Hours Date Hours
Total 0 0
2.8.2 Housekeeping / Beautification / Linesite / Compound
Date
2.8.3. Others
Date
Comments
Remarks
Details DetailsLine 1 Line 2
Remarks
Remarks
PAGE 17.2
2.8.4. Effluent Result For Agustus 2015
abcdefgh
2.8.5 Trailing Report
COD (mg / l)Total Nitrogen (mg / l)
DOE LimitpHBOD (mg / l)
Oil & Grease (mg / l)
Ammonical Nitrogen (mg / l)
Suspended Solids (mg / l)Total Solids (mg / l)
TQCC Result
PAGE 183.0 MANPOWER
3.1. EMPLOYEES
INDO CHINESE INDIANS OTHERS TOTAL Executives 3 1 4 Subordinate Staff 3 3 PBT 0 KHT 31 31 KHL 40 40 TOTAL 77 0 1 0 78
3.2. SUBORDINATE STAFF LEAVE STATUS
Leave Leave Leave B/F from Earned Todate TakenYear '14 for Year '15 (A+B) This Bal
No. Position (Days)-A (Days)-B Total Month (A+B-C)1 CC 3 12 15 152 Chargeman 12 12 123 Foreman 5 5 545678910111213141516171819202122232425262728
Comments :
Julius PetasSamsul Bahri
Leave Taken Todate
(C)NAMESamsul
PAGE 18.13.3 EMPLOYEE (MILL WORKERS)
(A) CHECKROLL
(1) INDONESIAN Male Female Sub Total Male Female Sub Total Chinese - - - Indian - - - Others 65 6 71 - 71 Grand Total 65 6 71 - - - 71
(2) NON-INDONESIAN Sri Lanka - - - India - - - Indonesia - - - Bangladeshi - - - Thai - - - Filipino - - - Grand Total - - - - - - - Total Checkroll 65 6 71 - - - 71
(B) CONTRACT / TEMPORARY
(1) INDONESIAN Male Female Sub Total Male Female Sub Total Chinese - - - Indian - - - Others - - - Grand Total - - - - - - -
Employees Dependants (Resident)Total
Employees Dependants (Resident)Total
PAGE 19Appendix 1
Unit This Month Last Month Todate1.0 FFB
1.1.1 Weight of FFB processed MT 7,339.290 4,948.360 13,083.390 1.1.2 Estimate MT 11,052.000 9,980.000 21,032.000 1.1.3 Shift Hours Hrs 652.00 - 652.00
2.0 OIL MANUFACTURE2.1.1 Weight of Oil Produced MT 1,812.285 1,179.773 3,127.384 2.1.2 Estimate MT 2,708.000 2,445.000 5,153.000 2.1.3 Oil Extraction Rate % 24.69 23.84 23.90 2.1.4 Estimate % 24.50 24.50 24.50 2.1.5 Press Running Hours Hrs. 134.50 97.00 262.67 2.1.6 Production Hours Hrs. 134.50 97.00 245.50 2.1.7 Downtime (Line 1) Hrs. - 2.1.8 Downtime (Line 2) Hrs. - 2.1.9 Press Capacity per unit MT / hr 54.57 51.02 49.81 2.2.0 F.F.B. Manufactured / Hours MT / hr 54.57 51.01 53.29 2.2.1 Oil Recovered / Hours MT / hr 13.47 12.16 13.47
3.0 KERNEL MANUFACTURE3.1.1 Weight of kernel Produced MT 192.236 144.061 359.990 3.1.2 Estimate MT 332.000 300.000 632.000 3.1.3 Kernel Extraction Rate % 2.62 2.91 2.75
;3.1.4 Estimate % 3.00 3.01 3.00 3.1.5 Production Hours Hrs. 134.50 97.00 245.50 3.1.6 Kernel Recovered / Hr MT / hr 1.43 1.49 1.47
4.0 DESPATCH AND STOCK4.1.1 Oil Despatched MT 911.990 - 911.990 4.1.2 Oil in Stock MT 2,205.392 2,205.392 4.1.3 Kernels Despatched MT 24.530 24.530 4.1.4 Kernels in stock MT 335.460 - 335.460
- Packed / Bulk Silo MT 335.460 167.754 335.460 - Kernel in Bag MT -
Remarks :
PROGRESS REPORT FOR THE MONTHOF AGUSTUS 2015
PAGE 20
MAJOR MAINTENANCE REPORT FOR THE MONTH OF AGUSTUS 2015
(1) RECEPTION STATION / (2) LOADING PUMP / (3) STERILISER STATION(4) HOISTING / TIPPER AND THRESHING STATION
(3) Pemasangan hand rail di paltform depan steriliser
PAGE 21
MAJOR MAINTENANCE REPORT FOR THE MONTH OF AGUSTUS 2015
(5) PRESS AND DIGESTER STATION / (6) EFB PRESSING STATION / (7) KERNEL PLANT STATION(8) CLARIFICATION STATION
(5) Penambahan hand rail platform press and digester menuju Tresher(7) Penambahan hand rail kernel plant menuju LTDS hopper(8) Penambahan hand rail clarification station
PAGE 22
MAJOR MAINTENANCE REPORT FOR THE MONTH OF AGUSTUS 2015
(9) RAW WATER HOUSE AND WATER TREATMENT PLANT STATION / (10) POWER STATION / (11) BOILER STATION(12) EFFLUENT STATION
(11) Change the ash conveyor boiler from class 300 to class 600(12) Improv pH anaerobic pond 1
PAGE 23
MAJOR MAINTENANCE REPORT FOR THE MONTH OF AGUSTUS 2015
(13) MILL BUILDING UPKEEP / (14) VEHICLE / (15) WORKSHOP / (16) GENERAL
CoverPageHighlightsProductionReportFFBCompositionFFBQualityLF_TrashContentProductionQualityProdDesKernelCPODesGPSRepCOPProcPerfDigPressStationDigPressStation2EFBPressingClarificationStationDecanterDilutionPurifierNutKernelStationNutCrackingEffKernelLossesBoilerPowerHouseWaterTreatmentGeneralGeneral2General3ManPowerEmployeeAppendix1MajorMaintRep1MajorMaintRep2MajorMaintRep3MajorMaintRep4
Main
KKS Progress Report version 1.61 for Agustus 2015
Please select your desire section by a mouse click
Section ASection B
3
Save
Information for the Progress Report
Co NameKUALA LUMPUR KEPONG BERHAD
Co Reg No.15043-VSetup
OC Code354
OC NameKARYA MAKMUR ABADI POM
Co Start of Fin Mth10
Current Year2015Reset
Current Month8Agustus
Current Month, YrAgustus 2015
Current Fin Mth #11th
Current Fin Mth11th
Current Fin Yr2015
Current Period2014/15
Asst/Manager NameArvin SanggarinTitleManager
Wt Shortage Limit80Kg
Exchange (RM1)3081Rp
By: Chan Kok LeongInstalled to:F:\progress report\version 1.61
Sys last updated:29-Oct-2014Set:16-Sep-2015
Title ListYearMonthYesNo
Assistant20111No
Senior Assistant20122Yes
Acting Manager20133
Manager20144
Senior Manager20155
20166
20177
20188
20199
202010
202111
202212
Brief Instructions1. Change the Current Year / Month2. Click to get to desire Worksheet Page3. Enter the necessary data - Use Tab key to move to different fields4. Click Save icon to save your work5. Click Print to preview print out
Notes:1. Click Setup to change system defaults2. Click Reset for default zoom or A4 size
++ means click tab for more pages
11. Process Performance
1. Highlights
2. Production Report
4. FFB Quality
5. LF and Trash Content
6. Production Quality
7. Production and Despatch Kernel
8. CPO Despatch Loads with wt shortage
9. GPS Violation Report
10. Cost of Production
12. Digesting & Pressing Station ++
13. EFB Pressing
1. Clarification Station
2. Decanter
3. Dilution Rate & Absolute Oil Loss
4. Purifier & Vacuum Dryer
5. Nut & Kernel Station
6. Nut Cracking Efficiency
7. Kernel Losses / Cost
8. Boiler / Power House
9. Water Treatment Plant
10. General (Visitors/Security/Breakdown, etc.) ++
11. Man Power
12. Appendix 1
3. FFB Composition
13. Major Maintenance Report ++
CoverPage
KARYA MAKMUR ABADI POM
Progress Report
For the month of
AGUSTUS 2015
Date10/9/15KUALA LUMPUR KEPONG BERHAD
(No. Syarikat: 15043-V)
KARYA MAKMUR ABADI POM
.
(Arvin Sanggarin)
Manager
Highlights
PROGRESS REPORT ONPAGE 1
KARYA MAKMUR ABADI POM
FOR THE MONTH OF AGUSTUS 2015
(11TH MONTH OF FINANCIAL YEAR)
HIGHLIGHTS
Estimated percentage of FFB pushed by shovel
Percentage FFB pushed due to grading
PRODUCTION
Current Financial YearSame Period Last Year
This MonthLast MonthTodateThis MonthTodate
O.E.R %24.6923.9423.90
K.E.R %2.622.912.75
RAINFALL RECORD (mm)Year2015
Fin YearOctNovDecJanFebMarAprMayJunJulAugSep
Last FY
This FY
OTHER HIGHLIGHTS
ITEMDESCRIPTION OF PROBLEMS / ACHIEVEMENTS
Comments :
- OER meningkat 0,75 %
- KER turun 0,29 %
Main Menu
ProductionReport
PAGE 2
1PRODUCTION REPORT
1.1.FFB STATEMENT
1.1.1.FFB CONTRIBUTION
Estimate forEstimate+/- Estimate+/- Estimate
This MonthTodateThis MonthTodateThis MonthTodate
KLK EstatesMTMTMTMTMTMT
KMA SELATAN5,219.3808,882.2307,399.0007,399.000-29.46%20.05%
KMA TENGAH2,119.9104,201.1603,653.0003,653.000-41.97%15.01%
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
Sub Total7,339.29013,083.39011,052.00011,052.000-33.59%18.38%
Non-KLK Estates
--
--
--
--
--
--
--
--
--
--
--
Sub Total- 0- 0- 0- 0--
Estimate forEstimate+/- Estimate+/- Estimate
This MonthTodateThis MonthTodateThis MonthTodate
OutsidersMTMTMTMTMTMT
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
Sub Total- 0- 0- 0- 0--
Grand Total7,339.29013,083.39011,052.00011,052.000-33.59%18.38%
Comment :
- total FFB proses 7.339,290 mt kurang dari estimate sebanyak - 33,59 %
Main Menu
FFBComposition
PAGE 3
1.1.2.FFB COMPOSITION
Composition of crop from various years of planting are :-
Year of PlantingThis MonthTodate
MT%MT%Palm Age1st-3rd4th-9th10th-18th19th&above
200819,638.7078.703,613.3227.947166.924786.500
20095,043.9820.218,832.1968.296295.7312637.5800
2010100.590.40188.841.465
20113.230.013.230.024
2012166.900.67295.732.293
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
Total24,953.40100.0012,933.31100.00
Append below the classification of Palms According to Age :-
CategoryPalm Age (years)TM %RemarksTD %
Immature1st - 3rd1%2%
Young4th - 9th99%98%
Prime10th - 18th0%0%
Old19th and above0%0%
Comments :
- 98 % buah yang diterima kategori young
- 2 % sisa nya kategori immature
Main Menu
FFBQuality
PAGE 4
1.1.3.FFB QUALITY
No. of Grading% Black% Underripe% Overnight% Rotten% Long Stalk% Pest Damaged% Empty Bunch
KLKThisLastThisLastThisLastThisLastThisLastThisLastThisLastThisLast
ESTATESMonthMonthMonthMonthMonthMonthMonthMonthMonthMonthMonthMonthMonthMonthMonthMonth
KMA SELATAN0.000.042.312.299.700.422.001.830.000.040.000.000.000.00
KMA TENGAH0.000.002.324.0814.331.302.484.170.080.460.000.000.000.00
average0.000.022.323.1912.020.862.243.000.040.250.000.000.000.00
Total/Average0.000.00- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
No. of Grading% Black% Underripe% Overnight% Rotten% Long Stalk% Pest Damaged% Empty Bunch
NON-KLKThisLastThisLastThisLastThisLastThisLastThisLastThisLastThisLast
ESTATESMonthMonthMonthMonthMonthMonthMonthMonthMonthMonthMonthMonthMonthMonthMonthMonth
Total/Average0.000.00- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
No. of Grading% Black% Underripe% Overnight% Rotten% Long Stalk% Pest Damaged% Empty Bunch
ThisLastThisLastThisLastThisLastThisLastThisLastThisLastThisLast
OUTSIDERSMonthMonthMonthMonthMonthMonthMonthMonthMonthMonthMonthMonthMonthMonthMonthMonth
Total/Average0.000.00- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0- 0
1.1.4.% FFB ON FLOOR AND IN LOADING RAMP FOR GRADING
LOADING RAMPFFB GRADING
FFB INTAKE (MT)WEIGHT (MT)%WEIGHT (MT)%
Comments :
- kebun tidak mengirim black bunch
- Under ripe mengalami penurunan sebesar 0,87%
- overnight mengalami peningkatan sebesar 11,16 %
Main Menu
LF_TrashContent
PAGE 4.1
1.1.5.LOOSE FRUIT & TRASH CONTENT
No. of Grading% LooseTrash Content inTrash Content in
Fruit in LoadLoose Fruit (%)FFB %
ThisLastThisLastThisLastThisLast
NOESTATESMonthMonthMonthMonthMonthMonthMonthMonth
1KMA SELATAN2.910.55
2KMA TENGAH- 0- 0
3
4
5
6
7
8
9
10
11
12
Average00- 0- 0- 0- 0- 0- 0
NOOutsider Estate
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Average00- 0- 0- 0- 0- 0- 0
1.1.6.LOOSE FRUITS TO FFB RATIO
Total Tonnage% to FFB
NOESTATESThis MonthLast MonthThis MonthLast Month
1- 0- 0
2- 0- 0
3- 0- 0
4- 0- 0
5- 0- 0
6- 0- 0
7- 0- 0
8- 0- 0
Average- 0- 0- 0- 0- 0- 0
NOOutsider Estate
1- 0- 0
2- 0- 0
3- 0- 0
4- 0- 0
5- 0- 0
6- 0- 0
7- 0- 0
8- 0- 0
Average- 0- 0- 0- 0- 0- 0
1.1.7.STONES & TRASH IN FFB
Trash
NOESTATESStones (kgs) per 100 tn FFBTonnage (mt)% to FFB
1
2
3
4
5
6
7
8
Comments :
- looses fruit dari KMA Selatan mengalami peningkatan sebanyak 2.36%
Main Menu
ProductionQuality
PAGE 5
1.2.PRODUCTION QUALITY
1.2.1.PRODUCTION OIL / DESPATCH OIL
PRODUCTIONDESPATCHMarketing
This MonthLast MonthThis MonthLast MonthSpecification
XS.D.XS.D.XS.D.XS.D.
4.990.604.450.215.170.24
FFA %< 5.0
0.240.040.270.090.250.02< 0.25
Moisture (VM) %
0.0220.0050.0300.0110.0200.000
Dirt %
Peroxide Value %
DOBI> 2.31
ANALYSIS RESULT BY (KDC/TQCC)
1st Week2nd Week3rd Week4th WeekTaiko
SAMPLEAverageStandard
FFA0.003.0 Max
VM0.000.13 Max
DIRT0.000.03 Max
PEROXIDE VALUE0.000.60 Max
IODINE VALUE0.0050 - 54
DOBI VALUE0.003.0 Min
CAROTENE0.00600 Min
E233 (1% CORR.)0.001.20 Max
E269 (1% CORR.)0.000.20 Max
IRON0.005.0 - 3.0
PHOSPHORUS0.008.0 - 5.0
D.F. (Delta Y)0.0020.0 Min
QUALITY RATING0.00NIL
Comments :
- FFA produksi 4.99 % mengalami peningkatan sebesar 0.54%
- Moisture 0.24 %
Main Menu
ProdDesKernel
PAGE 6
1.2.2.PRODUCTION / DESPATCH KERNEL
PRODUCTIONDESPATCH
THIS MONTHLAST MONTHTHIS MONTHLAST MONTHMARKETING
XS.D.XS.D.XS.D.XS.D.SPECIFICATION
MOISTURE %6.120.707.031.044.510.006%
DIRT %5.190.743.970.585.070.007%
FFA %1.810.091.700.144.620.00
TOTAL BROKEN KERNEL %23.671.9226.731.03
STONE CONTENT %0.370.060.520.130.470.00
1.2.3.CPO DESPATCH
BUYERMILLBUYER'S+ / -
NETNETON MILL
WEIGHTWEIGHTNET WEIGHT
tntntn
1-912.570911.990-0.580
2-0.000
3-0.000
4-0.000
5-0.000
6-0.000
7-0.000
8-0.000
9-0.000
10-0.000
912.570911.990-0.580
1.2.4.PK DESPATCH
BUYERMILL
NET
WEIGHT
tn
1-24.530
2-
3-
4-
5-
6-
7-
Total :24.530
1.2.5.CXC REPORT
THIS MONTHLAST MONTH
Total CPO tankers dispatched with active GPS (A)
Total CPO tankers dispatched with non-active GPS (B)
Total CPO tankers dispatched with no GPS installed (C)
Total number of CPO tankers dispatched (A+B+C)00
No. of loads with the weight shortage of 80kg and above
Comments :
- moisture dried kernel 6.12 %
- dirt 5.19 %
Main Menu
CPODes
PAGE 6.1
EXTRACTED FROM CXC REPORT
CPO Despatch Loads With Weight Shortage of 80kg and Above
LOADS FROM MONTH: Agustus 2015
Weight Details (MT)Actual oil recovered (MT) at Mill (B)Charges to the transporters (MT) *Tanker with GPS
Ticket NoDriverVehicleDateMillBuyerLoss (A)Buyer
0.0000.000
0.0000.000
0.0000.000
0.0000.000
0.0000.000
0.0000.000
0.0000.000
0.0000.000
0.0000.000
0.0000.000
0.0000.000
0.0000.000
0.0000.000
0.0000.000
0.0000.000
Total0.0000.0000.000
* Chargeable to transporters when (A) - (B) is above 80kg. Quantity chargeable is net after minus the limit of 80kg.
Comments
Main Menu
GPSRep
PAGE 6.2
GPS VIOLATION REPORT FOR KARYA MAKMUR ABADI POM ON Agustus 2015
On Exit the Zone Grid of Authorized Route during CPO delivery to Buyers Only
No.Tanker numberDateTimeAction Taken / RemarksNett Weight diff. with buyers (+/-) (MT)
Total0.000
Main Menu
COP
PAGE 7For amount fields, please fill up this section in Rupiah.
1.3.COST OF PRODUCTIONExchange Rate (RM1)3081Rp
(Basis : Cost per tonne CPO)Exchange Rate (RM1) for Todate3000Rp
ThisThis
MonthTodateYear ' sMonthTodateYear ' s
Agustus 201511 mthsEstimateAgustus 201511 mthsEstimate
RM / tnRM / tnRM / tnRp / tnRp / tnRp / tn
Indirect Cost77.4297.0285.19238,536.67291,067.16255,571.91
Depreciation0.000.00336.22- 0- 01,008,664.77
Manufacturing Cost166.47268.18152.79512,884.98804,532.83458,371.33
Ex-Mill Cost243.89365.20574.20751,421.651,095,599.991,722,608.01
Cooking Oil Cess0.000.000.00
Palm Oil Stabilisation Cess0.000.000.00
CPO (Sabah) Sales Tax0.000.000.00
Despatch & Selling0.000.0010.3030,905.29
TOTAL EXPENDITURE243.89365.20584.50751,421.651,095,599.991,753,513.30
A/cThis MonthEstimateCommentsThis MonthEstimate
CodeRM/ton CPORM/ton CPODiff. (%)Rp/ton CPORp/ton CPO
0.000.000.0%
IC 041.705.23-208.6%BPJS5,225.4916,125.64
IC 082.793.53-26.4%Pembelian peralatan pantry8,600.1210,867.28
IC 125.042.5050.4%Independence Day15,539.007,712.26
IC 141.942.78-43.2%Biaya operasional kantor5,974.088,553.60
IC 196.774.2337.5%Security expense20,858.9413,045.56
0.000.000.0%
PK 410.742.24-200.8%over time for supervisor2,294.806,902.67
PK 4210.3810.92-5.2%Labour wages31,981.3133,632.48
PK 4517.673.0183.0%Water Treatment dan Timbun waduk54,438.679,277.11
PK 466.013.0050.0%Cleaning tools dan Mill roads18,521.909,254.71
0.000.000.0%
PK 4714.594.2970.6%Chemical Effluent44,947.7613,212.70
PK 504.9011.13-127.1%Dump Truck running cost15,103.8434,302.00
PK 515.214.0123.2%Packing door steriliser dan blowdonchamber16,065.7212,339.62
PK 6334.2412.3763.9%Workshop charge and Workshop equipment105,495.3438,119.78
0.000.000.0%
0.000.000.0%
Comments :
Please enter the exchange rate at the main screen
Main Menu
ProcPerf
PAGE 8
2PROCESS PERFORMANCE
2.1.STERILIZATION
Summary of sterilisation cycle for the month is tabulated as follows :-
FunctionX (min)S.D.
Deaeration20BarPsi
1st. Peak(1,7 Bar / 24,65 psi)1501.724.65
1st. Peak exhaust30
2nd. Peak(2,5 Bar / 36,25 psi)1002.536.25
2nd. Peak exhaust30
3rd. Peak(2,75 Bar / 39,87 psi)1002.7539.87
3rd. Peak exhaust--
4th. Peak(0 Bar / 0 psi)--00
Holding Time450
Final exhaust80
Steaming cycle960
Door Open to Door Shut Time1250
This MonthLast Month
XS.D.XS.D.
USB after 1st Threshing (%)0.560.170.430.11
USB after 2nd Threshing (%)0.160.090.160.17
Threshing Efficiency (%)69.2817.6863.2831.35
STERILIZER CONDENSATE
This MonthLast Month
XS.D.XS.D.
Steriliser condensate (Oil Content in Wet Basis)6.641.448.132.35
Condensate / FFB Ratio
Absolute oil loss (kg/tn FFB)
Comments :
- USB final dibawah 1 %
Main Menu
DigPressStation
PAGE 9.0
2.2.DIGESTING & PRESSING STATION
2.2.1.DIGESTER TEMPERATURE OC
ThisMonthLastMonth
DIGESTERXS.D.XS.D.
Digester No. 185.004.0890.000.00
Digester No. 285.674.0390.000.00
Digester No. 386.333.8690.000.00
Digester No. 483.332.3690.000.00
Digester No. 5
Digester No. 6
Digester No. 7
Digester No. 8
Digester No. 9
Digester No. 10
Digester No. 11
2.2.2.PRESSING
PressPressPressPressPressPressPressPressPressPressPressAverage
No. 1No. 2No. 3No. 4No. 5No. 6No. 7No. 8No. 9No. 10No. 11
OIL LOSS ON WET BASIS (OLWB)This MonthX4.094.214.324.374.25
S.D.0.270.240.280.100.22
Last MonthX6.284.634.474.615.00
S.D.0.940.930.940.910.93
OIL LOSS ON DRY BASIS (OLDB)This MonthX6.756.897.067.297.00
S.D.0.360.600.570.320.46
Last MonthX10.187.547.257.338.08
S.D.1.621.841.681.741.72
NUT BREAKAGE (%)This MonthX14.4214.3613.6411.9813.60
S.D.1.772.202.870.981.96
Last MonthX13.6513.5713.4312.7513.35
S.D.1.572.492.701.752.13
PRESS RUNNING HOURSThis MonthX98.34119.9587.7626.3883.11
S.D.0.00
Last MonthX31.64101.8080.5444.8064.70
S.D.0.00
Comments :
- OLDB press average 7.00 %, Standard 8 %
- Broken nut average 13.60 %, Standard 15 %
Main Menu
DigPressStation2
PAGE 9.1
2.2.3.
True Mesocarp (ripe)True Mesocarp (unripe)Oil in MesocarpOLWBNormal ParthenocarpAbnormal PartnenocarpTrue NutTrash
This MonthLast MonthThis MonthLast MonthThis MonthLast MonthThis MonthLast MonthThis MonthLast MonthThis MonthLast MonthThis MonthLast MonthThis MonthLast Month
X
S.D.
N
Main Menu
EFBPressing
PAGE 9.2
2.2.4.EFB PRESSING
PressPressPressPressSuperSuper
No. 1No. 2No. 3No. 4Press 1Press 2
PRESS RUNNINGThis Month116.65127.91111.63
HOURSLast Month102.86105.03114.25
DOWN TIMEThis Month
Last Month
2.2.5.
OIL RECOVERED
This MonthLast Month
F F A(%)
DOBI
VM(%)
OLWB(%)
Press Fibre (OLDB)
Ratio EFB Liquor to FFB (%)
2.2.6.SPLITTER
Running HoursRUNNING HOURS
This MonthLast Month
No. 1
No. 2
Comments :
Main Menu
ClarificationStation
PAGE 10
2.3.CLARIFICATION STATION
2.3.1.CLARIFICATION TANK
This MonthLast Month
Tank 1Tank 2Tank 3Tank 4Tank 1Tank 2Tank 3Tank 4
Temperature OCX90.7391.9390.0090.00
S.D2.381.840.000.00
% Oil in underflowX7.457.999.097.78
(% OLWB)S.D1.060.921.860.61
2.3.2.SLUDGE SEPARATOR (S) / CENTRIFUGE (C)
S1S2S3S4C1C2C3C4C5C6C7C8
% Oil loss on wet basis (x)This MonthX0.951.021.010.99
S.D0.250.330.370.32
Last MonthX1.240.961.321.23
S.D.0.480.290.490.44
Operating Hours (hrs)T MthX106.46106.0097.8985.82
L MthX97.2679.6348.6864.73
Nozzle size (mm)T MthX
L MthX
Separate Waste Basculator (mt)T MthX
L MthX
Oil losses on Absolute Terms (Kg/tn FFB)T MthX
L MthX
Comments :
- average OLWB separator 0.99%
Main Menu
Decanter
PAGE 11
2.3.2.DECANTER (D)
InletSolid PhaseLight PhaseHeavy Phase
Temperature (oC)This Month
Last MonthD1D2D1D2D1D2
Oil % (x)This MonthX
S.D
Last MonthX
S.D.
VM % (x)This MonthX
S.D
Last MonthX
S.D.
NOS % (x)This MonthX
S.D
Last MonthX
S.D.
Operating HoursT MthX
L MthX
Comments :
Main Menu
Dilution
PAGE 12
2.3.3.DILUTION RATE & ABSOLUTE OIL LOSS
This MonthLast Month
XS.D.XS.D
DILUTION RATE %26.802.3428.738.16
Separator Waste to FFB ratio
Decanter cake to FFB ratio
Absolute Oil loss in Separator/Centrifuge kg/mt FFB
Absolute Oil loss in Decanter Cake kg/mt FFB
Total Oil loss kg/MT FFB0.000.000.000.00
2.3.4.OIL LOSSES AFTER DEOILING TANK TO EFFLUENT
DescriptionThis MonthLast Month
After Deoiling tank (OLWB)0.981.13
After Cooling pond
Comments :
- Oil looses final effluent 0.98 (OLWB)
Main Menu
Purifier
PAGE 13
2.3.5.PURIFIER & VACUUM DRYER
PURIFIERBefore PurifierAfter Purifier
No: 1No: 2No: 1No: 2No: 3No: 4No: 5
% VMThis MonthX0.750.51
S.D0.090.09
Last MonthX1.050.690.61
S.D.0.240.200.12
% DirtThis MonthX0.040.02
S.D0.010.00
Last MonthX0.060.030.02
S.D.0.020.020.01
VM Rem. EffThis MonthX90.99
S.D7.53
Last MonthX43.9740.75
S.D.25.8913.10
Dirt Rem. EffThis MonthX31.37
S.D10.81
Last MonthX31.4157.81
S.D.13.5816.35
2.3.6.VACUUM DRYER
VACUUM DRYERVacuum (-cm Hg)VM % Before DryerVM % After DryerVM. Removal Eff.
XS.DXS.DXS.D
No: 1This Month69.333.480.580.080.240.0457.57
Last Month70.000.000.770.290.270.0961.98
No: 2This Month
Last Month
No: 3This Month
Last Month
Comments :
- Moisture after vacuum dryer 0.24 %
- VM removal efficiency 57.57 %
Main Menu
NutKernelStation
2.4.NUT & KERNEL STATIONPAGE 13.1
2.4.1.NUT SILO & KERNEL SILOS
DESCRIPTIONNo: 1No: 2No: 3No: 4
% VM Fresh NutThis MonthX
S.D
Last MonthX
S.D.
% Dried NutThis MonthX
S.D
Last MonthX
S.D.
% Drying EfficiencyThis MonthX
S.D
Last MonthX
S.D.
2.4.2.KERNEL SILO
This MonthLast Month
1234512345
Temperature oCTop
Middle80.8682.1782.2080.0080.00
Bottom
% VM Fresh KernelX21.5321.5923.0321.9822.64
S.D1.000.961.250.820.79
% Dried KernelX6.005.996.005.885.47
S.D0.610.980.600.440.51
% Drying Efficiency72.5272.2174.5673.2475.87
Comments :
- Drying efficiency average 73.10 %
Main Menu
NutCrackingEff
2.4.3.NUT CRACKING EFFICIENCYPAGE 13.2
R I P P L E M I L L
Nut Composition before Cracker (INPUT)No: 1No: 2No: 3No: 4No: 5No: 6No: 7No: 8No: 9No: 10No: 11
XSDXSDXSDXSDXSDXSDXSDXSDXSDXSDXSD
Whole Nut (%)
Broken Nut (%)
Whole Kernel (%)
Brokern Kernel (%)
R I P P L E M I L L
Mixture Composition after CrackerNo: 1No: 2No: 3No: 4No: 5No: 6No: 7No: 8No: 9No: 10No: 11
XSDXSDXSDXSDXSDXSDXSDXSDXSDXSDXSD
Whole Kernel (%)15.050.5415.090.4716.031.2415.060.99
Broken Kernel (%)23.421.3522.300.7621.701.4023.342.12
Uncracked Nut (%)0.760.330.280.030.800.440.310.09
Half cracked Nut (%)1.110.241.280.441.320.331.360.25
Nut Cracking Eff.Kernel Recovery Eff.
XSDXSD
Ripple Mill No: 198.290.44
Ripple Mill No: 298.550.38
Ripple Mill No: 398.140.50
Ripple Mill No: 498.390.29
Ripple Mill No: 5
Ripple Mill No: 6
Ripple Mill No: 7
Ripple Mill No: 8
Ripple Mill No: 9
Ripple Mill No: 10
Ripple Mill No: 11
Comments :
- Nut cracking Eff 98.34%
Main Menu
KernelLosses
PAGE 14
2.4.4.KERNEL LOSSES / COST
This MonthLast Month
Line 1Line 2Line 3Line 1Line 2Line 3
XSDXSDXSDXSDXSDXSD
Cyclone Fibre1.050.391.920.341.090.191.060.20
LTDS1st Stage2nd Stage1st Stage2nd Stage1st Stage2nd Stage1st Stage2nd Stage1st Stage2nd Stage1st Stage2nd Stage
0.850.130.8800.0701.030.171.190.69
Hydrocyclone (PK in wet shell)1.260.211.570.78
Claybath1.530.871.260.58
2.4.5.RUNNING COSTFor amount fields, please fill up this section in Rupiah.
Exchange rate will be taken from Main and Cost of Producation accordingly
This MonthLast MonthTodate
Kernel Produced (mt)192.236126.344331.572This Month (Rp)Last Month (Rp)Todate (Rp)
Total Kaolin or Calcium Carbonate Cost (RM)4462.843755.3310780.0013,750,000.0013,200,000.0032,340,000.00
Other Cost e.g Sodium Silicate (RM)0.000.00
Cost / MT of PK (RM)23.2233.9132.5171,526.67104,476.6797,535.38
Cost / MT of FFB (RM)0.610.760.821,873.482,471.84
Comments :
- hydrocyclone wet shell di recycle ke claybath
- cost kaolin 61 sen / mt FFB
Main Menu
BoilerPowerHouse
PAGE 15
2.5.BOILER / POWER HOUSE
2.5.1.BOILER HOUSE
DescriptionThis MonthLast MonthTodate
Boiler Chemical Cost (Rupiah)Rp12,760,775.00Rp8,245,060.00Rp21,005,835.00
Cost / MT FFB (Rupiah)Rp7,339.29Rp1,670.00Rp9,009.29
2.5.2.POWER HOUSE
DescriptionOperating HoursTotal KwH GeneratedDiesel Consumption (Litres)KwKwHr / LitTurbine / Dieset Gen Set Kw
This MonthLast MonthThis MonthLast MonthThis MonthLast MonthThis MonthLast MonthThis MonthLast Month
Turbines>ElliotAllan KKKDresser RandElliotShinkoTurbodyneNadrowskiOthers
No. 1 (1700 KW)156.1132.687190.50.01700
No. 2 (0 KW)0
No. 3 (0 KW)0
No. 4 (0 KW)0
Diesel Gen Set >CumminsCaterpillarCumminsListerOthers
No. 1 (288 KW)400.2422.331052.856969.610851.09600.077.6134.92.865.93288
No. 2 (656 KW)118.4134.013731.155022.17000.012561.0116.0410.61.964.38656
No. 3 (0 KW)0
KwHr / mt FFB (Turbine + Genset)18.0Steam Consumption per KwHr (Turbine)
2.5.3.TNB POWER SUPPLY
This MonthLast MonthTodate
KwHrRpKwHrRpKwHrRp
Palm Oil Mill
Rubber Factory
Ecomat Plant
Total0.000.000.000.000.000.00
Comments :
Main Menu
WaterTreatment
PAGE 16
2.6.WATER TREATMENT PLANT
2.6.1.WATER CONSUMPTION
Water consumed
%
DescriptionThis MonthLast MonthThis MonthLast Monthm3/mt FFB
DomesticOwn640.00894.006.07%13.09%0.09
Estate1609.500.0015.27%0.00%0.22
Mill8290.005938.0078.66%86.91%1.13
FC
TOTAL10539.506832.00100.00%100.00%1.44
2.6.2.WATER TREATMENT COST
This MonthLast MonthTodate
Chemical Cost (RM)7359.238037.0015396.23
Cost /m3 water (cts / m3)0.701.181.87
Cost /mt FFB (cts / mt FFB)1.001.622.62
Water Consumption (m3 / mt FFB)1.131.202.33
2.6.3.MONTHLY LICENCE COST
PUMPING RAW WATER FROM RIVER
This MonthLast MonthTodate
Total Volume of water (m3) consumed10539.506832.0017371.50
Total Cost (RM)7359.238037.0015396.23
Comments :
- Cost / m3 water 7 sen
- Water consumption 1,13 m3/mt FFB
Main Menu
General
PAGE 17
2.7.General (Visitors / Security / Training Programme / Details of Breakdown, etc)
2.7.1.Visitation
DatePersonRemarks
2.7.2.Training
DateRemarks
8/3/15Internal training operator
8/24/15internal training operator effluent
2.7.3.Security
DateRemarks
8/5/15kordinasi security despatch CPO
2.7.4.OSH Matter
DateRemarks
2.7.5.RSPO Matter
DateRemarks
2.7.6.Amenities
DateRemarks
2.7.7.Water Supply
DateRemarks
8/1/15supply for estate
2.7.8.EFB DISPOSAL
Balance b/f (mt)Production (mt)Collected (mt)Balance c/f (mt)
715.321,321.071,252.64783.75
2.7.9.DECANTER CAKE DISPOSAL
Balance b/f (mt)Production (mt)Collected (mt)Balance c/f (mt)
Main Menu
General2
PAGE 17.1
2.8.0.Effluent Treatment
DateRemarks
2.8.1Mill Downtime
Line 1Line 2
DateHoursDetailsDateHoursDetails
Total00
2.8.2Housekeeping / Beautification / Linesite / Compound
DateRemarks
2.8.3.Others
DateRemarks
Comments
Main Menu
General3
PAGE 17.2
2.8.4.Effluent Result For Agustus 2015
DOE LimitTQCC Result
apH
bBOD (mg / l)
cCOD (mg / l)
dTotal Nitrogen (mg / l)
eAmmonical Nitrogen (mg / l)
fTotal Solids (mg / l)
gSuspended Solids (mg / l)
hOil & Grease (mg / l)
2.8.5Trailing Report
Main Menu
ManPower
PAGE 18
3.0MANPOWER
3.1.EMPLOYEES
INDOCHINESEINDIANSOTHERSTOTAL
Executives314
Subordinate Staff33
PBT0
KHT3131
KHL4040
TOTAL7701078
3.2.SUBORDINATE STAFF LEAVE STATUS
LeaveLeaveLeaveLeave Taken Todate (C)
B/F fromEarned TodateTaken
Year '14for Year '15(A+B)ThisBal
No.NAMEPosition(Days)-A(Days)-BTotalMonth(A+B-C)
1SamsulCC3121515
2Samsul BahriChargeman121212
3Julius PetasForeman555
400
500
600
700
800
900
1000
1100
1200
1300
1400
1500
1600
1700
1800
1900
2000
2100
2200
2300
2400
2500
2600
2700
2800
Comments :
Main Menu
Employee
PAGE 18.1
3.3EMPLOYEE (MILL WORKERS)
(A)CHECKROLL
EmployeesDependants (Resident)Total
(1) INDONESIANMaleFemaleSub TotalMaleFemaleSub Total
Chinese- 0- 0- 0
Indian- 0- 0- 0
Others65671- 071
Grand Total65671- 0- 0- 071
(2) NON-INDONESIAN
Sri Lanka- 0- 0- 0
India- 0- 0- 0
Indonesia- 0- 0- 0
Bangladeshi- 0- 0- 0
Thai- 0- 0- 0
Filipino- 0- 0- 0
Grand Total- 0- 0- 0- 0- 0- 0- 0
Total Checkroll65671- 0- 0- 071
(B)CONTRACT / TEMPORARY
EmployeesDependants (Resident)Total
(1) INDONESIANMaleFemaleSub TotalMaleFemaleSub Total
Chinese- 0- 0- 0
Indian- 0- 0- 0
Others- 0- 0- 0
Grand Total- 0- 0- 0- 0- 0- 0- 0
Main Menu
Appendix1
PAGE 19
Appendix 1
PROGRESS REPORT FOR THE MONTH
OF AGUSTUS 2015
UnitThis MonthLast MonthTodatePrevious Todate
1.0FFB
1.1.1Weight of FFB processedMT7,339.2904,948.36013,083.3905,744.100
1.1.2EstimateMT11,052.0009,980.00021,032.0009,980.000
1.1.3Shift HoursHrs652.00- 0652.00- 0
2.0OIL MANUFACTURE
2.1.1Weight of Oil ProducedMT1,812.2851,179.7733,127.3841,315.099
2.1.2EstimateMT2,708.0002,445.0005,153.0002,445.000
2.1.3Oil Extraction Rate%24.6923.8423.90
2.1.4Estimate%24.5024.5024.50
2.1.5Press Running HoursHrs.134.5097.00262.67128.17
2.1.6Production HoursHrs.134.5097.00245.50111.00
2.1.7Downtime (Line 1)Hrs.- 0- 0
2.1.8Downtime (Line 2)Hrs.- 0- 0
2.1.9Press Capacity per unitMT / hr54.5751.0249.81
2.2.0F.F.B. Manufactured / HoursMT / hr54.5751.0153.29
2.2.1Oil Recovered / HoursMT / hr13.4712.1613.47
3.0KERNEL MANUFACTURE
3.1.1Weight of kernel ProducedMT192.236144.061359.990167.754
3.1.2EstimateMT332.000300.000632.000300.000
3.1.3Kernel Extraction Rate%2.622.912.75
;3.1.4Estimate%3.003.013.00
3.1.5Production HoursHrs.134.5097.00245.50111.00
3.1.6Kernel Recovered / HrMT / hr1.431.491.47
4.0DESPATCH AND STOCK
4.1.1Oil DespatchedMT911.990- 0911.990- 0
4.1.2Oil in StockMT2,205.3922,205.392- 0
4.1.3Kernels DespatchedMT24.53024.530- 0
4.1.4Kernels in stockMT335.460- 0335.460- 0
- Packed / Bulk SiloMT335.460167.754335.460- 0
- Kernel in BagMT- 0- 0
Remarks :
Main Menu
MajorMaintRep1
PAGE 20
MAJOR MAINTENANCE REPORT FOR THE MONTH OF AGUSTUS 2015
(1) RECEPTION STATION / (2) LOADING PUMP / (3) STERILISER STATION
(4) HOISTING / TIPPER AND THRESHING STATION
(3) Pemasangan hand rail di paltform depan steriliser
Main Menu
MajorMaintRep2
PAGE 21
MAJOR MAINTENANCE REPORT FOR THE MONTH OF AGUSTUS 2015
(5) PRESS AND DIGESTER STATION / (6) EFB PRESSING STATION / (7) KERNEL PLANT STATION
(8) CLARIFICATION STATION
(5) Penambahan hand rail platform press and digester menuju Tresher
(7) Penambahan hand rail kernel plant menuju LTDS hopper
(8) Penambahan hand rail clarification station
Main Menu
MajorMaintRep3
PAGE 22
MAJOR MAINTENANCE REPORT FOR THE MONTH OF AGUSTUS 2015
(9) RAW WATER HOUSE AND WATER TREATMENT PLANT STATION / (10) POWER STATION / (11) BOILER STATION
(12) EFFLUENT STATION
(11) Change the ash conveyor boiler from class 300 to class 600
(12) Improv pH anaerobic pond 1
Main Menu
MajorMaintRep4
PAGE 23
MAJOR MAINTENANCE REPORT FOR THE MONTH OF AGUSTUS 2015
(13) MILL BUILDING UPKEEP / (14) VEHICLE / (15) WORKSHOP / (16) GENERAL
Main Menu
Sheet1