kathrein technology for the connected...

20
VERSION1.0 | Communication Day, Bucharest, 28 th April 2015 | KATHREIN TECHNOLOGY FOR THE CONNECTED WORLD 28/04/2015

Upload: lydung

Post on 18-Mar-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

VERSION1.0

| Communication Day, Bucharest, 28th April 2015 |

KATHREIN

TECHNOLOGY FOR THE CONNECTED WORLD

28/04/2015

2

Agenda

| Communication Day, Bucharest, 28th April 2015 |

Introduction: Kathrein in the connected world 1. The In-Building Challenge and Trends 2.

K-BOW: Kathrein’s future proof Micro C-RAN solution 3.

K-BOW: flexible capacity allocation 4.

K-BOW: Summary 7.

K-BOW: 2x2 MIMO integrated 5.

K-BOW: future proof connections 6.

3 3

KATHREIN

1. | Communication Day, Bucharest, 28th April 2015 |

Introduction

4

1. Kathrein: actively shaping the Connected World

| Communication Day, Bucharest, 28th April 2015 |

We act as a driving force in shaping the world of

the future, where technologies converge.

Thinking ahead for 95 years

Founded in Rosenheim in 1919 by

Anton Kathrein

A recognised specialist in complex high

frequency technologies

Family owned business in the 3rd

generation

Roughly 8,900 employees worldwide

Leading position in mobile communication,

automotive, IPTV and broadcast solutions

5 5

KATHREIN

2. | Communication Day, Bucharest, 28th April 2015 |

The In-Building Challenge and Trends

6

2. The In-Building Challenge: Growing Demand

Motivation for in-building mobile infrastructures:

80% of mobile data traffic happens indoor

modern buildings are energy efficient metalized windows

thermal insulation

concrete walls

bad signal experience is quite common

improve customer experience indoor, in venues and public

places (LTE & 2x2 MIMO experience)

improve network operator reputation

serve capacity flexibly where is required, when is required

mobile communications become just another utility in

buildings and venues DAS Report Nov. 2014

Source: Mobile Experts

| Communication Day, Bucharest, 28th April 2015 |

7

2. The In-Building Challenge: trends to flexible solutions

| Communication Day, Bucharest, 28th April 2015 |

Flexibility/Capacity/MIMO

Single

Operator

Multi

Operator

Coverage

Small Cell

Solutions Passive

DAS

Femto Cell

Solutions

Repeaters

Active

DAS

Smart

DRS

Smart

DRS

Kathrein answers the question:

What are the key features for an indoor solution to be highly flexible and future proof?

8 8

KATHREIN

3. | Communication Day, Bucharest, 28th April 2015 |

K-BOW: Kathrein’s future proof Micro C-RAN solution

9

3. K-BOW system architecture overview

| Communication Day, Bucharest, 28th April 2015 |

Optical Connection

Wireless Connection

Coax Connection

OEM basestation vendor

agnostic

Multi-operator solution

Multi-band solution

Multi-standard solution

Installation benefits

compared to DAS

Power saving benefits

Indoor optimization,

automation and SON

C-HUB

E-HUB E-HUB

RU RU RU RU RU RU

10 10

KATHREIN

4. | Communication Day, Bucharest, 28th April 2015 |

K-BOW: flexible capacity allocation

11

4. Flexible capacity allocation in buildings

Capacity routing to where capacity is

actually required

Saving costs (network resources and

power consumption)

Without touching cabling, changing

setup per room/floor/building

Fast response to changing end-user

requirements

Adapting the system to the actual

situation/scenario

Support of single- and/or multi-

operator use cases

Traffic develops differently over the

day per building area

K-BOW saves up to 20% capacity

compared to legacy DAS solutions

Typical modern

enterprise city building

12 12

KATHREIN

5. | Communication Day, Bucharest, 28th April 2015 |

K-BOW: 2x2 MIMO integrated

13

5. K-BOW: 2x2 MIMO integrated

| Communication Day, Bucharest, 28th April 2015 |

K-BOW Compact RU with integrated antenna

• 1800MHz MIMO , 2100MHz, 2600MHz MIMO

• GSM, UMTS, LTE

• Individual composite power settings

• Integrated directional MIMO antennas

K-BOW Connect RU with external antenna

• 900MHz, 1800MHz MIMO , 2100MHz, 2600MHz

MIMO

• GSM, UMTS, LTE

• Individual composite power settings

• External antenna connectors for main and MIMO

Ready for 4x4 MIMO applications (by combining co-located and interleaved MIMO)

LTE-A ready (Carrier Aggregation and Coordinated Multi Path CoMP)

14

5. K-BOW: switching from SISO to 2x2 MIMO

Dynamic DAS System

| Communication Day, Bucharest, 28th April 2015 |

DAS BS

RU

RU

MIMO

BS

MIMO

BS

RU

RU

BS K-BOW

E-Hub

E-Hub

Legacy DAS System

Upgrading from SISO to

2x2 MIMO without any

change in the system

architecture.

Future-proof solution.

15 15

KATHREIN

6. | Communication Day, Bucharest, 28th April 2015 |

K-BOW: future proof connections

16

6. K-BOW future proof optical connections

| Communication Day, Bucharest, 28th April 2015 |

C-HUB E-HUBs Remote Units and Antennas

Optical Connection

Coax Connection

BTS

BTS

BTS

digital

analog

analog

17

6. Choose the right and future proof cable

CATx Coax Optical Fiber

Characteristics 4x Twisted Pair (copper) Coaxial geometry, 1/2``, 7/8``

or 14/8``

N x 12 fibers per cable

Max length 80-100m 150-200m 3km (analog)

10km (digital)

Installation skills No relevant skills HF skills required No relevant skills

Datarate 10Gbps Up to 100Gbps, multiplex

opportunities

50% of total cost of a deployed indoor solution is cabling

Optical fiber supports future technology upgrades

Avoid invest every other year in cabling to support technologies upgrade

Optical fibre is the future proof cabling supporting future proof indoor solutions

18 18

KATHREIN

7. | Communication Day, Bucharest, 28th April 2015 |

K-BOW Summary

19

7. K-BOW: flexible and future-proof indoor solution

| Communication Day, Bucharest, 28th April 2015 |

How K-BOW is flexibile and future

proof?

remotely managing capacity

demand

integrating 2x2 MIMO remote

units and antennas (4x4 MIMO

also possible)

using optical cables from C-HUB

to RUs

providing LTE-A features (Carrier

Aggregation, CoMP)

K-BOW has become reality: live demo setup in Kathrein HQ Rosenheim with real BTS connected.

You are invited to our HQ to attend to a demo session and play directly with the K-BOW system.

MNO1

MNO2

MNO3

MNO4

20 | Communication Day, Bucharest, 28th April 2015 |

THANK YOU [email protected]