Kenosha County Energy Team. Top 5 Things To Know. #5. DIVERSIFY YOUR ENERGY TEAM. Active Team Membership include: KC Finance KC Public Works/Facilities KC Executive Office UW-Extension WE Energies (Public Utility Focus on Energy Private Electrical Engineering Contractors - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Kenosha County Energy Team

KENOSHA COUNTY ENERGY TEAMTop 5 Things To Know

Page 2: Kenosha County Energy Team

#5

Page 3: Kenosha County Energy Team

Active Team Membership include:1. KC Finance2. KC Public Works/Facilities3. KC Executive Office4. UW-Extension5. WE Energies (Public Utility6. Focus on Energy7. Private Electrical Engineering Contractors

Diversify the rank/positions of your team; maintenance, directors, chiefs, etc.

DIVERSIFY YOUR ENERGY TEAM

Page 4: Kenosha County Energy Team

#4KEEP YOUR EYE ON THE ‘END GAME’

Page 5: Kenosha County Energy Team

KEEP YOUR EYE ON THE END GAMEEstablish clear deliverables and Check-In with Goals often!Our Team Goals Include:1. KC Budget Allocation2. Improved Building Performance3. Focus On Energy Incentive Goals4. Technical Capacity/Energy Literacy5. Community Awareness6. Utilization of Renewable Energy Sources

Page 6: Kenosha County Energy Team

#3BRING IN HELP

(…WITH AN ACCOUNTING BACKGROUND)

Page 7: Kenosha County Energy Team

BRING IN HELP (…WITH AN ACCOUNTING BACKGROUND)1. Hire/Engage assistance from assertive, independent

and fearless individual(s) with great Excel skills2. Make sure data-entry is paired with analytic skills3. Get familiar with Portfolio Manager terminology

before data entry4. Take full building tour and collect building info from

blueprints, work closely with ‘building chiefs’ Gross Floor Area, Weekly Operating Hours, Number of Computers,

etc. SEE Building Questionnaire, Slide 8

Page 8: Kenosha County Energy Team
Page 9: Kenosha County Energy Team

#2INVOLVE A FACILITATOR

Page 10: Kenosha County Energy Team

INVOLVE A FACILITATOR1. Facilitator will drive consensus around priorities,

communicate with team members outside of meetings, set meetings/agendas.

2. Facilitator will be a contact point for external partners

3. Facilitator can work across ‘silos’ (UW-Extension Community, Natural Resources and Economic Development Educators are a great resource!)

Page 11: Kenosha County Energy Team

#1BUILDING PERFORMANCE <> HVAC SYSTEMS

Page 12: Kenosha County Energy Team

BUILDING PERFORMANCE <> HVAC SYSTEMS1. View performance holistically and reduce

redundancy Try to do work right—the first time to minimize

hassle/fatigue2. Keep focused on Portfolio Manager Data

Collection WHILE also cataloguing/managing existing HVAC systems

See Electrical Panel Directory and Distribution Directory, Slide 13 and 14

Page 13: Kenosha County Energy Team
Page 14: Kenosha County Energy Team

PANEL # LOCATION Breaker Cap. Unused Cap Fed From Main Breaker Descritpion of feedsDESCRIPTION OF FEEDSTRANSFRMR SW BUILDING SE OFC BLDG WE ENERGIES MAIN

MAIN S MECHRM TRANSFRMR TRANSFRMR

MD1 AHU2 MECRM MAIN 1600 Amp DIMMING PANEL-150A, LP2-125, RP1A&B-150A, AHU RM 208-150A

AHU RM 200-200A, LP6 W/C STORAGE-200A, PP2 PUBLIC WORKS-800A

LP3-125A, LP1-100A, RP3-60A, RP2-60, ELEVATOR-50

PP2 GEN RM MD1 800A PP3, GENERATOR, LP5, RP6, RP7, EMERGENCY POWER

PP3 GEN RM PP2 LP4, RP4, TRANSFORMER, CRANES, WELDERS, AIR COMPRESSORS, ELEVATOR

RP1A AHU2MECRM 42 11 MD1 200A FB'S, RF, EXFAN,RM'S 202,182,149,163 KITCHENSRP1B " 42 2 MD1 200A FB'S,EXFAN, RMS 145,117 KITCHEN, BOILER 1&2

HVAC & WATER CONTROLSLP1 1FLR MEC RM 18 9 MD1 PARKING & OUTSIDE LIGHTS - OFFICE BUILDINGRP2 TIME CLK RM 42 1 MD1 150A P&D, HS, DOOR OPERATOR, HELIPAD LIGHTS & WINDSOCK, RMS 147-205

ICS-1&2, CONFERENCE RM-AV/TV EQUIPMENT

LP2 TIME CLK RM 30 13 MD1 RMS 146-205RP3 S. STOR RM 42 7 MD1 150A RMS 102-145, 180-184, TIME CLOCKLP3 S. STOR RM 30 10 MD1 HALL, RMS 100-145RP4 GEN RM 30 2 PP3 100A HWYS OFFICE &REPAIR,AHU3 CONTROLS, RP4ARP4A GEN RM 30 14 RP4 RP4A-1, RADIOS, ICE MACHINE, TELEPHONE EQUIP/UPS, 911 OFFICE,

HEALTH DEPT LG & SM REFRIGERATORS

RP4A1 TIME CLK RM 24 21 RP4A 1-15 AMP, 208V, BREAKER FOR HEALTH LAB OUTLETSLP4 GEN RM 18 4 PP3 100A REPAIR SHOP, SHIP/REC, MECHANIC SHOP, FB'S, GEN.BLOCK HEATER

RP5 REPAIR OFC 18 5 PP3 100A RP5A, FIRE PANEL, FUEL PUMPS & LIGHTSRP5A REPAIR OFC 18 5 RP5 FUEL ISLAND EQUIPMENTLP5 MEZZ NORTH 42 14 PP2 200A LOT LTS, SPRAY BOOTH, LOCKER RM, SEE LEGENDRP6 MEZZ NORTH 42 0 PP2 150A LOCKERROOM, SIGNSHOP, IR'S, CAFETERIALP6 WARM STOR 30 5 MD1 200A SALT SHED, W/C STORAGE BLDG EQUIP, RP8RP7 WASHBAY E. 42 2 PP2 150A IR'S, SUMP PUMP, WELD & BODY SHOP, PREP RM EXHAUST FAN

RP8 WARM STOR 18 LP6 100A REC.PANEL A TOWER BLDG 42 18 Disconnect TOWER BLDG RECEPTACLES & COMM EQUIP., GENERATOR, TOWER LTS

HEARING RM MD1 150A A/V EQUIPMENT & STAGE LIGHTSHEARING RM MD1 150A A/V EQUIPMENT & STAGE LIGHTS

KCC TRANSFER SWITCH IN GENERATOR RM FOR HWYS AND OFFICETOWER TRANSFER SWITCH IN TOWER BLDG GENERATOR RM FOR TOWER BLDGPANEL B REPROD RM 8 6 P&D STANDALONE A/C UNIT

Page 15: Kenosha County Energy Team

THANK YOU!Amy GreilKenosha County UW-ExtensionCommunity, Natural Resource and Economic Development [email protected]