KERR UNIT 3 THRUST BEARING UPGRADE 3 UNITS 2007 – UNIT 3 FRANCIS TURBINE WAS UPGRADED OUTPUT INCREASED FROM 71 MW TO 90 MW

Upload: phamdang

Post on 16-Mar-2018

229 views

Category:

Documents


1 download

TRANSCRIPT

KERR UNIT 3 THRUST BEARING UPGRADE

•3 UNITS

•2007 – UNIT 3 FRANCIS TURBINE WAS UPGRADED

•OUTPUT INCREASED FROM 71 MW TO 90 MW

UNIT 3 THRUST BEARING

•AUGUST 2014 WIPED FIRST TIME

•OCTOBER 2015 WIPED AGAIN

RESULTSLOWER OPERATING TEMPERATURE: 13 – 20 DEG C COOLER

NO HIGH PRESSURE OIL LIFT PUMP NEEDED

TOTAL THRUST STATIC PLUS DYNAMIC – 583.2 TONS

429 PSI LOADING

BABBITT WAS AT 85.8% OF DESIGN

PTFE IS AT 47.6% OF DESIGN

lbs. (=tons) lbs. (=tons)

Turbine

Runner Wgt 110000 55 130000 65

Shaft Wgt 60000 30 60000 30

Total 170000 85 190000 95

Est. Hyd Thrust 290000 145 433666 216.833

Total Turb incl thrust 460000 230 623666 311.833

Generator Rotating element

Shaft 60000 30 60000 30

Rotor 450000 225 450000 225

Total 510000 255 510000 255

Exc Rotor 17660 17660 8.83

Pilot Exciter Rotor 5000 5000 2.5

Misc. 10000 5 10000 5

% Increase

1002660 501.33 1166326 583.163 16.3%

712660 356.33 732660 366.33 2.8%

290000 145 433666 216.833 49.5%

368.6 428.8 16.3%

81.9% 95.3%

47.6%

2720 in2

2720 in2

450 psi

1767.75 psi

900 psi

TOTAL W/ HYD THRUST

TOTAL STATIC WEIGHT

HYD THRUST ONLY

Existing Old Turbine Revised Wts

2016 Actual Values Per Load Cells

Thick Runner w/ Refined Thrust

Suggest above amount add to Rotor

Thrust @181.44 ft Head & 70% Gate

Proposed Voith

Thrust Shoe Loading Tot Wt (psi)

Babbitt shoe bearing area =

Babbit shoe design limit =PTFE shoe Bearing Area =

PTFE shoe design limit =

% of Max Babbitt Bearing Capacity =

% of Max PTFE Bearing Capacity =

Shoe

No. 1 21 44 47 49 50 52 52 53 54 55 55 56 56 56 57 57 57 57 57

Shoe

No. 2 2016 21 47 49 52 53 55 55 56 57 58 59 59 60 60 60 60 60 60 61Shoe

No. 2 2007 20 67 17 69 16 71 17 73 16 74 15 74 15 75 15 75 15 75 76

Shoe

No. 3 2016 21 46 48 51 52 54 54 55 56 57 58 58 59 59 59 59 59 59 60Shoe

No. 3 2007 15 61 13 64 13 67 14 69 13 70 13 71 12 71 13 72 13 72 73

Shoe

No. 4 21 45 47 50 51 53 53 54 55 56 57 58 58 58 58 58 58 58 59

Shoe

No. 5 21 44 47 49 51 53 53 54 55 56 56 57 57 57 57 57 57 57 58

Shoe

No. 6 2016 21 39 42 45 47 49 50 51 52 53 54 54 55 55 55 55 55 55 56Shoe

No. 6 2007 28 67 24 69 22 71 22 73 20 73 21 75 20 75 20 75 20 75 76

Shoe

No. 7 21 42 44 46 48 50 50 51 51 52 53 53 54 54 54 54 54 54 55

Shoe

No. 8 21 44 46 48 50 52 53 53 54 55 56 57 57 57 57 57 57 57 58

Oil 2016 20 33 33 35 35 37 37 38 38 39 40 40 40 41 40 41 41 40 42

Oil 2007 6 39 6 41 7 44 8 46 8 47 7 47 7 48 7 48 9 49 49