key features specifications - triyards · projection of legs below hull during transit..... n/a...
TRANSCRIPT
• Value engineered to optimise build weight and overall structural strength and still deliver premium capabilities and performance
• Utilises innovative modular electrical outfitting approach to maximise efficiency
• No fixation (Rack Chock) is utilised or required, lessening operational costs and complexity and still satisfying Classification Society Storm Holding requirements in 100 knot wind environments.
• Designed with the owner in mind; utilising the latest State-of-the- Art drilling equipment, the cantilever package height is designed to accommodate the most restrictive regulations for HPHT BOP configurations adopted post Gulf of Mexico Macondo Incident.
SPECIFICATIONSLENGTH268.5ft
WIDTH221.5ft
TOTAL LENGTH OF LEGS530ft
DRILLING DEPTH32,500ft
SAFETY EQUIPMENTS Four (4) 110 man SOLAS Approved LifeboatsFour (4) 35 man SOLAS Approved Life Rafts
DECK CRANESTwo (2) Triyards Pedestal Cranes 70 ton 120 ft. boom
ACCOMODATIONSUp to 220 persons
Key Features
TDU400Jack-Up GENERAL SPECIFICATIONS
792WTD106A
MLD1
MC
C 2
MC
C 1
FRO
NT
CO2
ESD
FRO
NT
FRO
NT
FRO
NT
FRO
NT
MCC D.
480V
SW
BD
C.M
.
FRO
NT
UPS
NO.2
208/
120M
SB
120
8/12
0MS
B2
792WTD106A
CO
2
CO2
4160
:480
LVHV
4160:2200HV
LV
4160:2200HV
LV
4160:2200HV
LV
4160:2200HV
LV
4160
:480
LVHV
NO.2
600V V
FD's
FRO
NT
H.F
.
NO.1
NO.1
NO.1
UPS
PRINTERALARM
CHULL14182224
MECH. WORKSHOP
DRILL PRESS
UNIVERSAL MILLING MACHINE
LATHE
HY
DR
AU
LIC
P
RE
SS
GRINDER
POWER HACKSAW
WORK TABLE
TOOLS BOX
SHELVES
SH
ELV
ES
UP
SANITARY & POTABLEWATER PRESSURE SET
MACHINERY SPACE (PORT FWD)
STORAGE
ENGINEROOM
STORAGE
RUBBER STORES
A/C
4160:2200HV
LV
A/C ELECTRICAL ROOM
TRANSFORMERROOM
AR
CH
WAY
CRANE COLUMN
SH
ELV
ES
16
PORT BILGE MANIFOLD
UP
DE
SK
BOOKSHELF
ELE.TEST PANEL
WORK BENCH
TOOL BOARD
ELECTRICALWORKSHOP
4160:2200HV
LV
H.F
.
NO.2
UP
UP
D.W
MA
NIF
OLD
PUMP BOUNDARY
STBD BILGE MANIFOLDUP
FLG-9
FLG-9
FLG-9
FLG-9
FLG-9
FLG-9
FLG-9
FLG-9
FLG-9
FLG-9
FLG-9
FLG-9
FLG-9
FLG-9
FLG-8
FLG-3
FLG-8
FLG-3
FLG-3
FLG-13
FLG-13
FLG-13
FLG-3
FLG-3
FLG-3
FLG-3
FLG-13
FLG-3
FLG-3
FLG-3
FLG-3
FLG-3
FLG-3
FLG-3
FLG-3
FLG-13
FLG-13
FLG-13 FLG-8
FLG-13
FLG-13
FLG-13
FLG
-13
FLG
-13
FLG
-13
FLG
-13
FLG
-13
FLG
-13
FLG
-13
FLG
-13
FLG-3
FLG-3
FLG-3
FLG-3
FLG-3
FLG-3
FLG-3
FLG-3
FLG-3
FLG-3
FLG-3
FLG-3
FLG-3
FLG-3
FLG-3
FLG-3
FLG-3
FLG-3
FLG-3
FLG-3
FLG-3
FLG-6
FLG-6
FLG-6
FLG-6
FLG-6
FLG-6
FLG-6
FLG-6
FLG-6
FLG-6
FLG-6
FLG-6
FLG-6
FLG-6
FLG-6
FLG-6
FLG-6
FLG-6
FLG-6
FLG-6
FLG-6
G-6
G-6
G-6
G-6
G-6
G-6
FLG-3
FLG-3
BRINETANK
BASE OILTANK
CRANE COLUMN
BILGEPUMP
CH
AR
GIN
G P
UM
PS
BILGEPUMP
MACHINERY SPACE (PORT AFT)
COMPRESSOR ROOM (STBD. AFT)
SEACHEST
POTABLEWATER U/VPURIFIERS
UVPUMP
TANK GAUGING SENSOR PLCCONTROL PANEL
DIRTYOIL PUMP
FUEL OILPUMPS
LUBE OIL TANK ABOVE
FUEL OILCOOLER
(TYP.)
LUBE OILPUMP
SEACHEST
SALT WATER &2nd FIRE PUMP
DRILL WATERPUMPS
FIREPUMP
BRINEPUMP
FM-200
AIR
DR
YE
R
WIN
DO
W
BASE OILPUMP
SLI
DIN
G
DO
OR
WATERMAKER
PRELOADCONTROLPANEL
TANK GAUGINGSENSOR PLCCONTROL PANEL
PRELOADCONTROLPANEL
TANK GAUGING SENSOR PLC
CONTROL PANEL
PRELOADCONTROL
PANEL
OIL WATER SEPARATOR
FUEL OIL DAY TANK
TANK GAUGINGSENSOR PLCCONTROL PANEL
AR
CH
WAY
FUELFILTERS
FM-200
TANK GAUGING SENSOR PLC
CONTROL PANEL
PRELOADCONTROL
PANEL
AIR RECEIVERTANKS
BOOKSHELF
4160
:600
HV
LV
4160
:600
HV
LV
MA
STE
RM
AS
TER
JB08
A
4 3 2 1 0
ARCHWAY
PRELOADCONTROL PANEL
15
UP
MUD PIT#2
MUD PIT#1
MUD PIT#3
MUD PIT#4
MUD PIT#5
MUD PIT#6
MUD PIT#7
MUD PIT#8
SLUGGINGPIT
PILLPIT #1
PILLPIT #2
FLG-6
FLG-6
FLG-3
FLG-3
FLG-
13
FWD.
CHULL
DN
FIRE EXTINGUISHER
30'-0
"
71'-0
"
142'
-0"
39'-9
"39
'-9"
221'
-6"
54'-0" 130'-0" 92'-11 11/16"
36'-5"
MAST
DOWN
ESCAPEEMERGENCY
ESCAPEEMERGENCY
DOWN
REELHOSE
REELHOSE
DOWN
DOWN
D = 22
.2 m
210°
73'-0
"
APPR
OAC
H &
TAKE
OFF
SEC
TIO
N
APPROACH & TAKEOFF SECTION
CCANTILEVERBEAM
30'-0
"
CCANTILEVERBEAM
CHULL
CLEG
CLEG
CLEG CLEG
*This specification is given in good faith and assumed to be accurate at the time of print.** Owners will not be liable for errors, omissions, or misprints published. Owners reserve the rights
to amend this specification without notification.
GENERAL DESCRIPTION
Quarters Capacity .............................................. Up to 220 personsClient Offices ....................................................8 Independent Offices Operating Water Depth ..................................... min 15 ft. up to 400 ft.Maximum Drilling & Setback Load @ 80 ft. on C/L .............. 2300 kipsMaximum Combined Drill Floor & Deck Load ......................... 7300 kips Maximum Cantilever Outreach to Well ........................................80 ft.Maximum Drill Floor Offset from C/L ........................ 15 ft. R/L of C/LJacking capacity.............................................................. 39,600 kips Jacking system Electricomechanical Rack & Pinion Auto RPD............................... VFD controlled Auto RPD (Rack Phase Differential) Jacking with Full Preload ...............................................................YesBuilt with 90, 440-Kip opposed drives (five-high)Independent leg jacking at 1.5 ft./min, with a total normal elevating capacity of 20,707 kips and preload jacking of 39,600 kips. Monitoring and control from touch screen displays.Length .................................................................................268.5 ft.Width .................................................................................. 221.5 ft.Depth of Hull .............................................................................27 ft.Total length of Legs ................................................................. 530 FtLeg Chord spacing (ft.) ...............................................................41 ft.Projection of Legs Below Hull During Transit..........................................................................................N/A FlushLongitudinal Leg Centers ..........................................................130 ft.Transverse Leg Centers ............................................................ 142 ft.Spud Cans: Diameter and Height: Fully retractable cans fitted with jetting system ........................................................................50 ft. by 17 ft.
STORAGE CAPACITIES (Maximum Spec)
Fuel (Bbl.) ................................................................................. 3248 Drill Water (Bbl.) ...................................................................... 13617Potable Water (Bbl.) ...................................................................2285Preload Capacity (kips).................................. 14624 kips (40,500 bbl.) Active & Reserve Mud Pits (Bbl.) .................................................4900Brine (Bbl.)................................................................................ 1324Base Oil (Bbl.) ........................................................................... 1324Slugging Pit Capacity (Bbl.) .......................................................... 150Bulk Mud (Bentonite & Barite) Cu/ft.............................................8200Bulk Cement Cu/ft. .................................................................... 4100Sack Storage (sacks) .................................................................5000Tubular & Drill Collars ......................................................... 1100 kipsPreload time @ 14,000 gpm (hrs.) ....................................................4
MUD CONDITIONING EQUIPMENT (Min Spec Shown) - Ample space for varying client preferences and/or configurationsFlow Divider ............................................ One (1) Specialty Flo-DividerGumbo Removal ................................................... One (1) Gumbo UnitShakers ..........................Four (4) Shakers 600 gpm per unit AWD units
Vacuum Degasser ................................... Two (2) 1100 gpm DegassersCentrifuge .............................................................Two (2) Centrifuges
WELL CONTROL EQUIPMENT
BOP Stack ...................... (18 3/4 - 15,000 psi) & (13 5/8 - 15,000 psi)BOP Trolley System ............................................................... 100 tonsBOP Stumps ............................... Two (2) to accommodate both StacksDiverter ..................................................................................49 1/2Conductor Tensioning System ....................................................... Hull
DRILLING EQUIPMENTDerrick .................................................................... 35 x 35 x 160 ft.Drilling Depth (ft.) ................................................................... 32,500Drill Floor Dimensions ........................................................ 65 x 80 ft.Maximum Set back Load ....................................................... 800 kipsMaximum Top Drive or Rotary Load ...................................... 1500 kipsMaximum Tensioning Load .................................................... 300 kipsDrawworks ........................................................................... 4600 hpTop Drive ....1,000 sh-ton in elevator, 98,000 ft-lbs Continuous 115,000 ft-lbs MU/BreakoutPipe Handling Systems .................................................... SmartRacker Offline Stand Building ......................Independent Offline Stand BuildingIron Rough Necks ....Two (2) Roughnecks handling 3 1/2 DP to 9 3/4 DC 103,300 ft-lbs Make Up & 147, 500 ft-lbs Breakout TorqueHydraulic Power Slips................................................. One (1) hydraulic operated power slip, (PS30 equivalent) Blohm + Voss type for pipe range 2-3/8” to 22”, rated 750 sh-ton and complete with hydraulic guide system for 49-1/2” rotary table.Tubular Catwalk Machine One (1) SmartCat™ Catwalk Machine with Tail-in Arm used to transport tubular and smaller equipment to and from drill floor. 2 7/8 to 36 inch up to 50 ft. in lengthPipe Deck Crane with Pipe Yoke Load Rated for 10 ton @ 52.5 ft. with Maximum outreach of 82 ft. and a min radius of 10.5 ft. Gripper Head Accommodates 2 7/8 to 20 in pipeMud Pumps.................................. (3) W2214 2200 HP 7500 psi RatedRescue Boat .................................................................. 1 x 6 personsDavit ..................................................................... Ferri, SWL: 2 tons
CRANES & WINCHES
Deck Cranes ....... Two (2) Triyards Pedestal Cranes 70 ton 120 ft. boomKnuckle Boom ...............................(1) utilized for Offline Stand BuildingLoad Rated for 10 ton @ 52.5 ft. with Maximum outreach of 82 ft. and a min radius of 10.5 ft. Mooring Winches ..............................................................................(4) 2 Speed 25 mt Winches with 3000 ft. or 2in wire ropeAnchors .................................................. 7 ton Flipper Delta or Stevfix
RIG POWEREngines .................................................... Five (5) C175 CaterpillarEmergency Generator ........................................One 3512 B Caterpillar
SAFETY EQUIPMENTLifeboats ....................................... Four (4) 110 man SOLAS ApprovedLife Rafts ................................... Four (4) 35 man SOLAS Approved
Heliport ......................................................... CAP 437 (S - 92 Rated)Service Elevator ............................ Multi-purpose Elevator Floors 1-4Galley ..................................................... 100 persons per seating
www.triyards.com
12221 Almeda RoadHouston, Texas 77045 USA
T: +1 713 434 3322F: +1 713 433 9502E: [email protected]
Dong Xuyen Industrial ParkVungTau City, BR-VT Province, Vietnam
T: +84 64 62 55 999F: +84 64 62 55 995E: [email protected]
99 Quarter 3, Thanh My Loi Ward, Dist. 2, HCMC, Vietnam
T: +84 8 3742 4000F: +84 8 3897 6446E: [email protected]
www.triyards.com
Triyards is an engineering and fabrication solutions provider focused on the oil and gas industry. Established in 1989 and part of the Ezra Group since 2005, TRIYARDS is a leading offshore contractor and provider of integrated offshore solutions in the offshore oil and gas industry. We currently own and operate two fabrication yards in Vietnam and another in Houston, USA.
• Vessel design and building services • Fabrication and assembly of jack-ups, offshore platforms,topsides, and jacket and steel structures • Vessel and rig repair and overhaul services and installation • Design and fabrication of offshore equipment, such as heavy lift cranes and winches
Wind Speed
Water Depth (ft.)
Maximum Wave Height (ft.)
Wave Period (seconds)
Surface Current
Air Gap
Penetration
Minimum Design Temperature (F)
100 Kt Wind (50 ft above sea level) 85 Kt Wind 70 Kt Wind
300
80
14.2
1 kt
50
10
-10
350
70
13.4
1 kt
50
10
-10
400
54
11.6
1 kt
50
10
-10
400
64
12.8
1 kt
50
10
-10
400
71
13.4
1 kt
50
10
-10
ENVIRONMENTAL CRITERIA