key players in the success of the main 212 renovation bethany trombley, project manager richard...

Download Key Players in the Success of the Main 212 Renovation Bethany Trombley, Project Manager Richard McDaniel, Construction coordinator Neil Crump, Manager

If you can't read please download the document

Upload: miles-boyd

Post on 17-Jan-2018

215 views

Category:

Documents


0 download

DESCRIPTION

Rolling the Carpet Carrying the Carpet into the Building

TRANSCRIPT

Key Players in the Success of the Main 212 Renovation Bethany Trombley, Project Manager Richard McDaniel, Construction coordinator Neil Crump, Manager of shop construction Armando Blanco, Carpenter shop supervisor Tom Akin, Electric shop supervisor Sammy Pipes, Paint shop supervisor Robert Arredondo, General Construction shop supervisor Kevin Alexander, Abatement shop supervisor Cole McClellan, ITS Julian Gutierrez, ITS Mark Bove, Bommarito Group Mary Piette, Bommarito Group Christine Briseno, Bommarito Group Starting to roll carpet The carpet is 80 feet long and 40 wide. Rolling the Carpet Carrying the Carpet into the Building Carrying the carpet up the stairs It was carried up the stairs by 32 people on the Sunday after Thanksgiving. Rolling scaffold We reversed the door swing to make the room compliant with fire code. We replaced the glass in the doors to the balcony with safety glass. The gold decorations (gilding) is 23 carat gold leaf. The draperies, the solar shades, and the blackout shades are automated, and will make the room more comfortable. They will also protect the finishes. Discussions