EAST SIDE COASTAL RESILIENCY PROJECTCOMMUNITY ENGAGEMENT SESSIONS: WATERFRONT CONNECTIONS MAY 19,20,&28 2015
KEY FINDINGS:
Access to East River Park via the elevated pedestrian bridges: - Safe and inviting access to East River Park (ERP) is the community’s number one priority. - The bridges should announce entry into the park through: 1. A gently sloping ramp that is ADA accessible; 2. A generous walkway that accommodates pedestrian and bike circulation in segregated lanes; 3. Improved lighting (at the east side approach, on the bridge, and at the west side approach); 4. A variety of plantings integrated into the landscape at the bridge approach and along the walkway; 5. Appropriate wayfinding signage Community suggestions for programming: - Participants indicated that the following spaces would significantly enhance ERP: - Playgrounds for younger children in the southern portion of the park - Outdoor exercise equipment - Affordable and healthy concession stands throughout ERP - Additional BBQ/picnic areas - Unprogrammed open space - Some groups suggested that the space underneath the bridge ramps could be used for programming
Community suggestions for improved bridges: - Participants expressed that they would like to have access to ERP from Grand St (via a ramp or a new bridge) - The E6th St table showed some interest in realigning the bridge with the plaza in ERP - The E10th St table indicated that a ramp extending into the neighborhood would increase the bridge’s visibility
Neighborhood connections: - Several groups stressed the need for effective stormwater management in the neighborhood - Others inquired about access restrictions to the park during construction - Additional discussion topics included green job opportunities for local residents and pest control
PROJECT AREA 1 (from Montgomery St to E14th St)
KEY STATISTICS:05/20 Community Engagement Workshop at Henrietta Szold High School- 59 sign-ins (counts exclude City & consultant team members but include media (0) and elected officials reps. (2))- 17 activity sheets collected- 29 voting ballots collected
1.
2.
3.
SUMMARY REPORT
05/28 Community Engagement Workshop at Church of St. Brigid- 102 sign-ins (counts exclude City & consultant team members but include media (1) and elected officials reps. (3))- 23 activity sheets collected- 42 voting ballots collected
4.
WORKSHOP FORMAT:Both workshops focused on the following theme: How can the ESCR project improve access to East River Park? Using activity sheets, participants engaged in small roundtable discussions where they collectively identified the strengths and weaknesses of the five existing access points to East River Park. A second set of roundtable discussions focused on neighborhood connections in Project Area 1.
EAST SIDE COASTAL RESILIENCY PROJECTCOMMUNITY ENGAGEMENT SESSIONS: WATERFRONT CONNECTIONS MAY 19,20,&28 2015
1. ROUNDTABLE DISCUSSION FINDINGS:
EXISTING CONDITIONS - CORLEARS HOOK BRIDGE SUMMARY: Participants stressed that although access to East River Park occurs through a neighborhood park and a generous 30 ft wide walkway, poorly maintained amenities and a lack of adequate lighting make this area feel unsafe at night.
1 ENSURE SAFE CIRCULATION THROUGH SEGREGATED LANES
“The ramp should blend fluidly from the park side into the amphitheater side for bikes and pedestrians.”
“Ensure it remains wheelchair friendly and accessible by all.”
“Separating bikes and pedestrians is a great idea!”
4 ADDRESS SAFETY CONCERNS BY IMPROVING LIGHTING
2 ENHANCE THE BRIDGE CROSSING THROUGH LANDSCAPING
5 INCORPORATE SIGNAGE
3 IMPROVE SURROUNDING PARK AMENITIES
“We need more trees and plants in Corlears Hook Park and on the bridge itself.”
“There should be more plantings in the park and on the bridge.”
“We like the Seattle Freeway Park example! ”
“We need playgrounds for younger children and more BBQ areas in the south of the park.”
“The dog run needs to be better maintained!”
“The comfort station is always closed. ”
“The walkway below the bridge is dark and unsafe. It needs better lighting!”
“This area is very poorly lit at night, it’s a scary entry into the park.”
“There needs to be more lighting at the bridge.”
“How one gets to the park should be clearer, or it won’t matter how much the site itself is improved!”
“People from outside the local area don’t use or know about Corlears Hook Park. There should be more signs in the park.”
COMMUNITY SUGGESTIONS FOR IMPROVED ACCESS TO EAST RIVER PARK:
“IT NEEDS TO BE REPAIRED!”
“THIS AREA IS VERY POORLY LIT AT NIGHT. IT’S A SCARY ENTRY INTO THE PARK! ”
“THE WALKWAY BELOW THE BRIDGE IS DARK AND UNSAFE. IT NEEDS BETTER LIGHTING !”
CHERRY STREET
“THE DOG RUN NEEDS TO BE BETTER MAINTAINED!”
“THERE ARE MANY POTHOLES ALONG THE BIKEPATH”
“THIS COMFORT STATION IS ALWAYS CLOSED”
FDR DRIVE
CORLEARS HOOK BRIDGEGRAND STREET
“THESE FIELDS ARE HEAVILY
USED”
“AT THE AMPHITHEATER, PEOPLE RUN UP THE STAIRS AND USE THE BENCHES TO EXERCISE”
“WHEN I HAVE COMPANY I USE THIS BRIDGE. IT'S THE MOST PLEASANT
ACCESS TO THE PARK.”
EAST SIDE COASTAL RESILIENCY PROJECTCOMMUNITY ENGAGEMENT SESSIONS: WATERFRONT CONNECTIONS MAY 19,20,&28 2015
1. ROUNDTABLE DISCUSSION FINDINGS:
EXISTING CONDITIONS - DELANCEY STREET BRIDGE SUMMARY: Circulation and vehicular traffic were major concerns at Delancey Street Bridge. The area sees heavy use by taxis, buses, and other automobiles, as well as cyclists, making access difficult and dangerous for pedestrians. Noise off of the Williamsburg Bridge, a lack of trees, and poor lighting contribute to an atmosphere that feels unpleasant and dangerous at night.
COMMUNITY SUGGESTIONS FOR IMPROVED ACCESS TO EAST RIVER PARK:
“THE MAJOR BUS ROUTES STOP ON GRAND STREET”
“THIS STAIRCASE IS DANGEROUSLY
STEEP”
“THIS IS A DANGEROUS AREA. BIKES RIDE FAST DOWN THE RAMP AND CARS ARE PULLING OUT OF THE
PARKING LOT AT THE SAME TIME ”
“MANY CYCLISTS USE THIS RAMP”
“THERE AREN’T ENOUGH TREES BY THE DELANCEY
RAMP” “PEOPLE OFTEN GET MUGGED HERE”
“THIS AREA IS VERY NOISY”
DELANCEY STREET
GRAND STREET
DELANCEY ST BRIDGE
1 PROVIDE FLUID ACCESS TO THE PARK VIA GENTLE RAMPS
“The bridge ramps are too steep on both sides.”
“Ensure it remains wheelchair friendly and accessible by all.”
“This staircase is dangerously steep!”
4 CREATE A CONNECTION FROM GRAND STREET?
“Build a new bridge at Grand Street and rehabilitate the Delancey Street bridge!”
“We would prefer an entrance at Grand St rather than Delancey.”
“A ramp from Grand St would link to the bus stops.”
2 WIDEN THE BRIDGE TO ALLOW FOR MULTIMODAL CIRCULATION
“Widen the Delancey Street bridge to include separate lanes for bikes and pedestrians.”
“Bikes and pedestrians should be separated by a green barrier.”
“We’d like a wide bridge with separate lanes!”
3 ANNOUNCE ENTRY TO THE PARK THROUGH LANDSCAPING
“We would like benches on the bridge to be able to rest.”
“More vegetation on the bridge!”
“It would be nice to see greenery on your way to the park”
6 INCORPORATE SIGNAGE
“Signage would help visitors”
“We need better wayfinding signage!”
“You could include interesting landmarks too.”
5 ADDRESS SAFETY CONCERNS BY IMPROVING LIGHTING
“Safety and visibility are key!”
“We need more lighting at night, this is a dangerous area.”
“People often get mugged here.”
EAST SIDE COASTAL RESILIENCY PROJECTCOMMUNITY ENGAGEMENT SESSIONS: WATERFRONT CONNECTIONS MAY 19,20,&28 2015
EXISTING CONDITIONS - HOUSTON STREET OVERPASS SUMMARY: Participants responded positively to the new circulation pattern proposed by DOT and recognized that it would alleviate some of the current issues relating to pedestrian access, namely the lack of traffic lights and pedestrian crossings. However, multiple groups stressed that the steep and narrow ramps leading up to the overpass present great challenges to those with limited mobility and prevent many residents from accessing the park at this location.
COMMUNITY SUGGESTIONS FOR IMPROVED ACCESS TO EAST RIVER PARK:
1. ROUNDTABLE DISCUSSION FINDINGS:
HOUSTON ST OVERPASS“AS SENIORS, WE GO TO THE E6TH BRIDGE BECAUSE IT IS SAFER AND
FASTER THAN HOUSTON ”
“THIS IS A VERY DANGEROUS
CROSSING FOR KIDS!”
“GOING UP THE RAMP IS DIFFICULT WHEN
BREATHING IS HARD BECAUSE OF ASTHMA
“THERE ARE A LOT OF SPORT TOURNAMENTS HERE SO PEOPLE DRIVE AND DROP OFF THEIR KIDS
ON THE BRIDGE WHILE THEY PARK”
FDR DRIVE
“THESE BALLFIELDS ARE VITAL TO THE NEIGHBORHOOD”
“THESE RAMPS ARE VERY NARROW”
“IT’S VERY DIFFICULT TO ACCESS THE PARK IN A
WHEELCHAIR”
E HOUSTON STREET
4 INCORPORATE SIGNAGE
“Many schools and little leagues use these fields, signage in the neighborhood and along the East River esplanade would help.”
1 CREATE A FAMILY FRIENDLY PEDESTRIAN CROSSING
“We need more child-friendly crossings.”
“Ensure bike and family friendly accessibility”
“Traffic lights will do some good!”
2 PROVIDE FLUID ACCESS TO THE PARK VIA GENTLE RAMPS
“It’s very difficult to access the park in a wheelchair.”
“The transition from the bridge into the park should be improved.”
“Gradual sloping ramps are good!”
3 ANNOUNCE ENTRY TO THE PARK THROUGH LANDSCAPING
“The overpass should connect directly with the earthen berm!”
“More trees on the streets!”
EAST SIDE COASTAL RESILIENCY PROJECT
1. ROUNDTABLE DISCUSSION FINDINGS:
EXISTING CONDITIONS - E6TH STREET BRIDGE SUMMARY: The majority of comments at E6th Street Bridge pointed to difficulties of access. Respondents stressed overcrowding on the bridge during summertime, the danger of collisions between pedestrians and cyclists, and steep entry ramps causing problems for wheelchairs. However, areas of the park near this bridge were generally liked and well-used.
COMMUNITY SUGGESTIONS FOR IMPROVED ACCESS TO EAST RIVER PARK:
COMMUNITY ENGAGEMENT SESSIONS: WATERFRONT CONNECTIONS MAY 19,20,&28 2015
“IT’S A STRUGGLE TO CROSS THE BRIDGE IN A
WHEELCHAIR”
“THE CHAIN LINK FENCE ON THE BRIDGE IS UGLY”
“THIS IS THE NICEST TREE AREA. KEEP
THE TREES!”
“WE ARE SCARED OF PEDESTRIAN AND BIKE
COLLISIONS WHEN CROSSING THE BIKEWAY NEAR THE E6TH
ST BRIDGE RAMP”“THE BRIDGE GETS CROWDED IN THE SUMMER. YOU HAVE TO PAY ATTENTION TO AVOID CYCLISTS.”
FDR DRIVE
“THE RAMPS ARE TOO STEEP ON BOTH SIDES OF
THE BRIDGE”
E6TH ST BRIDGE
E6TH STREET
1 PROVIDE FLUID ACCESS TO THE PARK VIA GENTLE RAMPS
“The ramps are too steep for parents with strollers and older residents .”
“It’s a struggle to cross the bridge in a wheelchair”
“No switchbacks!”
2 WIDEN THE BRIDGE TO ALLOW FOR MULTIMODAL CIRCULATION
“Separate bike and pedestrian lanes to avoid conflicts - especially with younger children.”
“Widen the bridge to allow for bikes and pedestrians to cross”
“Add dividers, like on the Williamsburg bridge!”
4 ANNOUNCE ENTRY TO THE PARK THROUGH LANDSCAPING
“We need more artistic design on the bridge, the fencing could look like the skyline outline!”
“Please add benches on the bridge.”
“We love the vegetated bridge!”
5 ADDRESS SAFETY CONCERNS BY IMPROVING LIGHTING
“Incorporate the lighting into the fencing!”
“There are a lot of blind spots. Better lighting is key!”
“More lighting is very important.”
6 INCORPORATE MULTILINGUAL SIGNAGE
“Add foreign languages on all of the signage!”
“We need better signage.”
3 RELOCATE PEDESTRIAN BRIDGE TO ALIGN WITH PLAZA?
“It would be great to align the bridge with the plaza.”
“It’s a better route!”
EAST SIDE COASTAL RESILIENCY PROJECT
1. ROUNDTABLE DISCUSSION FINDINGS:
COMMUNITY ENGAGEMENT SESSIONS: WATERFRONT CONNECTIONS MAY 19,20,&28 2015
EXISTING CONDITIONS - E10TH STREET BRIDGE SUMMARY: Most participants at E10th Street focused on the lack of visibility on both sides of the bridge. Lack of night-time lighting makes for a high incidence of muggings. The chain link fence and flat gradient on the residential side make the bridge difficult to see from a distance, prompting uses of the space that are not conducive to a recreational atmosphere. Additionally, fast cyclists and steep entry ramps make access difficult and sometimes dangerous.
COMMUNITY SUGGESTIONS FOR IMPROVED ACCESS TO EAST RIVER PARK:
E10TH ST BRIDGE “IN A WHEELCHAIR IT’S EASIER TO GO TO 23RD ST TO CROSS WHERE IT’S FLAT AND
THERE ARE NO RAMPS”
“I DON’T LIKE TO BIKE ON THIS BRIDGE BECAUSE OF
THE SWITCHBACKS”
“THE RAMPS ARE TOO STEEP ON BOTH SIDES
OF THE BRIDGE AND THE SWITCHBACKS ARE NO GOOD
FOR WHEELCHAIRS”
“IT’S HARD TO SEE THROUGH THE CHAIN LINK FENCE AT AN ANGLE AND IT’S NOT WELL LIT AT NIGHT OR IN THE MORNING
SO THERE ARE ALOT OF ROBBERIES ON BOTH SIDES OF
THE BRIDGE ”
“CYCLISTS TRAVEL FAST AND THERE ARE COLLISIONS
WITH PEDESTRIANS”
“GET US IN THE MOOD FOR A PARK! YOU CAN’T SEE THE BRIDGE FROM
BACK HERE”
“PEOPLE PARK THEIR CARS AND WASH THEM ON E10TH ST. IT
FEELS LIKE NO ONE IS AWARE OF THE PARK ACCESS”
FDR DRIVE
E10TH STREET
AVENUE D
1 PROVIDE FLUID ACCESS TO THE PARK VIA GENTLE RAMPS
“The ramps are too steep, a handrail would help.”
“All of the bridges with switchbacks are difficult for bikes.”
“An easier grade would be an improvement!”
2 WIDEN THE BRIDGE TO ALLOW FOR MULTIMODAL CIRCULATION
“A wider bridge would be preferable to avoid collisions between pedestrians and cyclists.”
“This bridge gets crowded with picnic goers.”
“Separate lanes is a great idea!”
3 INCORPORATE PROGRAMMING UNDER THE BRIDGE
“A daycare center would be a great addition!”
“There are no places to get a snack next to the park.”
“The underside of the bridge could be used as a rain shelter.”
4 ANNOUNCE ENTRY TO THE PARK THROUGH LANDSCAPING
“The Central Park bridges are great, you are never aware of the traffic below.”
“Get us in the mood for a park!”
“The bridge isn’t visible from the community.”
5 ADDRESS SAFETY CONCERNS BY IMPROVING LIGHTING
“I want no hidden points that reveal suprises to the unwary!”
“There are a lot of robberies on both sides of the bridge.”
“Safety is key. Better lighting would help!”
6 ADD SIGNAGE AND PARK AMENITIES
“Include areas of interest nearby on the signs too!”
“We need more BBQ/picnic areas!”
“More water fountains!”
Please rank the pedestrian connections to indicate which of them most need to be improved in order to provide better access to East River ParkTotal number of participants who responded to Q1: 71 out of 161 attendees
Question 1:
EAST SIDE COASTAL RESILIENCY PROJECTCOMMUNITY ENGAGEMENT SESSIONS: WATERFRONT CONNECTIONS MAY 19,20,&28 2015
1. ROUNDTABLE DISCUSSION FINDINGS:
VOTE RESULTS:
SPRING ST
GRAMERCY PK N
JANE ST
GREE
NWIC
H AV
7 AV
E 25 STGRAMERCY PK S
E 24 STW 13 STE 18 ST
W 4 ST
E 22 STW 12 ST
W 15 ST
3 AV
E 17 ST
W 14 ST
E 16 ST E 19 STE 21 ST
2 AVBANK ST 5 AV
PARK AV S
WAV
ERLY
PL
W 12 ST E 23 ST ASSE
R LE
VY P
L
IRVI
NG P
L
E 18 ST
UNION SQ W
E 20 ST
E 15 ST
BLEE
CKER
ST
W 13 ST
W 11 STW 11 ST
E 17 ST
UNION SQ E
7 AV S
AV OF THE AMERICAS
W 14 ST
E 15 STE 17 ST E 21 STE 18 ST
W 11 ST
W 12 ST
2 AV
W 13 ST E 23 ST
BLEE
CKER
ST
E 16 ST
UNION SQ E
W 11 ST
UN
ION
SQ
S
UNION SQ W
E 20 ST
AV OF THE AMERICAS
IRVI
NG PL
PERRY ST
E 19 ST
W 12 ST
1 AV
7 AV S
MILLIGAN PL
PATC
HIN
PL
GREE
NWIC
H AV E 18 STE 15 ST
UNION SQ S
WAV
ERLY
PL
E 14 STE 13 ST
E 16 ST
CHARLES ST
W 4
ST
UNIVERSITY PL
W 11 ST
E 15 ST
W 10 ST
BROADWAY
3 AV
IRVI
NG P
L
E 12 ST
4 AV E 18 ST
W 9 STW 10 ST 5 AV
E 20 ST
RUTH
ERFO
RD P
L
E 14 ST
GAY ST
CHRISTOPHER ST
E 17 STE 13 ST
BLEE
CKER
ST
SHERIDAN SQE 11 S
TW 9 ST
W 8 ST
E 16 ST
GROVE ST
N D
PERL
MAN
PL
WAVERLY PL
7 AV S
E 12 ST
MAC DOUGAL AL
W 8 ST E 13 ST
MAC DOUGAL ST
E 15 ST
BARROW ST
W 4
ST
WASHINGTON SQ N
BROADWAY
E 9 ST
WEST WASHINGTON PL
E 10 STJONES ST
E 12 ST
WASHINGTON MEE 11 S
TCOMMERCE ST
4 AV
BEDF
ORD
ST
CORNELIA ST
WASHINGTON SQ N
AV OF THE AMERICAS
WASHINGTON SQ W
E 8 ST
WASHINGTON SQ S
WANAMAKER PLMORTON ST
UNIVERSITY PL
BLEE
CKER
STLEROY ST
3 AV
GREENE ST
7 AV S
MINETTA LA
E 11 STE 9 ST
W 3 ST
WAVERLY PL
LAFAYETTE STCARMINE ST
MAC DOUGAL ST
MERCER ST
ASTOR PL E 10 ST
STUYVESANT ST
AV A
WASHINGTON SQ S
THOMPSON ST
MINETTA ST
BROADWAY
WASHINGTON SQ E
WASHINGTON PL
SULLIVAN ST
E 16 STE 13 ST
E 9 ST
DOWNING ST
BLEECKER ST
ST MARKS PL 1 AV
2 AV
LA GUARDIA PL
E 12 STW 4 ST
E 14 ST
COOPER SQ
COOPER SQ
NO NAME
W 3 ST
WASHINGTON PL E 13 ST
GREENE ST
ST MARKS PL
DOWNING ST
BEDF
ORD
ST
NO NAME
NO NAME
W 4 ST
MERCER ST
VARICK ST
E 10 ST E 12 ST
AV A
E 13 ST
AV OF THE AMERICAS
E 7 ST
AV B
E 9 ST
COOPER SQ
W 3 ST
SULLIVAN ST
BLEECKER ST 2 AV
LA GUARDIA PL
E 15 STE 11 ST
MAC DOUGAL ST
W HOUSTON ST
T SHEVCHENKO PL
LAFAYETTE ST
ST MARKS PL
COOPER SQ
E 4 ST
BROADWAY
E 14 STE 6 ST 1 AV
KING ST
E 12 ST
THOMPSON ST
E 7 ST
E 10 STE 13 ST
BLEECKER ST
SHINBONE AL
2 AV
CHARLTON ST
E 5 ST
E 11 ST
GREAT JONES ST
E 6 ST E 12 STE 4 ST
BOWERY
MERCER ST
AV B
JONES AL
BOND ST
W HOUSTON STVANDAM ST AV
C
E 12 ST
AV A
E 5 ST
BROADWAY
E 9 STE 7 ST
BLEECKER ST
E 3 ST E 6 ST E 10 ST
PRINCE ST
W HOUSTON ST
SZOL
D PL
E 8 ST
E HOUSTON ST
1 AV
E 4 ST
AV D
E 2 ST
E 9 ST
BOWERY
CROSBY ST
E 7 ST
2 AV
UN
NAM
ED ST
E 3 ST E 10 ST
E 5 ST
WOOSTER ST
E 8 ST
JERSEY ST
SULLIVAN ST
MERCER ST
E 1 ST
GREENE ST
E 6 ST
MOTT ST
BROOME ST
LAFAYETTE ST
E 7 ST
E HOUSTON ST
MULBERRY ST
WATTS ST
AV B1 AV
BROADWAY AV A
PRINCE ST
ELIZABETH ST
SPRING ST E 2 ST E 5 ST
AV OF THE AMERICAS
E 4 STE 1 STE 6 ST
FORSYTH ST
AV C
WEST BROADW
AY
THOMPSON ST
CROSBY ST
MERCER ST
E 3 ST
ELDRIDGE ST
STANTON ST
E HOUSTON ST
CHRYSTIE ST
ALLEN ST
STANTON ST
SPRING ST
PRINCE ST
NO NAME
ORCHARD ST
THOMPSON ST
E 5 ST
E HOUSTON ST AV B
E 6 STAV C
BROADWAY
GRAND ST
MERCER ST
CLEVELAND PL
SPRING ST E 3 STSTANTON ST
E 4 ST
FORSYTH ST
BROOME ST
KENMARE ST
ELIZABETH ST
WEST BROADW
AY
RIVINGTON ST
LUDLOW ST
E 2 ST
BOWERY
WOOSTER ST
LAFAYETTE ST
ALLEN ST
MOTT ST
STANTON ST
GREENE ST
ELDRIDGE ST
CLEVELAND PL
E 3 ST
MERCER ST
CROSBY ST
AV D
CHRYSTIE ST
KENMARE ST
MULBERRY ST
CANAL ST
RIVINGTON ST
ORCHARD ST
E HOUSTON ST
AV O
F TH
E AM
ERIC
AS
NORFOLK ST
CENTRE MARKET PL
ATTORNEY ST
DELANCEY ST
BROOME ST
ESSEX ST
SUFFOLK ST
RIVINGTON ST
GRAND ST
LISPENARD ST
CLINTON ST
HOWARD ST
WALKER ST
CHURCH ST
E HOUSTON ST
COLU
MBI
A ST
STANTON ST
RIDGE ST
DELANCEY ST
BROOME ST
LAFAYETTE ST
GRAND ST
FORSYTH ST
CORTLANDT AL RIVINGTON STHESTER ST
BARUCH PL
DELANCEY STWHITE ST
CENTRE ST
MOTT ST
BARUCH DR
MANGIN ST
ATTORNEY ST
FRANKLIN PL
BROOME ST
CANAL ST
BAXTER ST
ELIZABETH ST
FRANKLIN ST
BOWERY
NORFOLK ST
HESTER ST
PITT ST
SUFFOLK ST
MULBERRY ST
CORTLANDT AL
CHRYSTIE ST
LUDLOW ST
GRAND ST
COLUMBIA ST
DELANCEY ST
CANAL ST
ALLEN ST
ESSEX ST
BROOME ST
WHITE ST
ORCHARD ST
ELDRIDGE ST
LEONARD ST
BENSON PL
MAN
HATT
AN B
R AP
RIDGE ST
MOTT ST
WORTH ST
CANAL ST DELANCEY ST S
HESTER ST
LAFAYETTE ST
CLINTON STGRAND ST
BAYARD ST
BROADWAY
DELANCEY ST
MANHATTAN BR AP
ELIZABETH ST
FORSYTH ST
HESTER ST
LEONARD ST
BAYARD ST
WORTH ST
ELIZABETH ST
BAXTER ST
ESSEX ST
BOWERY
BAYARD ST
ORCHARD ST
BIALYSTOKER PL
GRAND STDELANCEY ST S
BAXT
ER S
T BROOME STCANAL ST
LUDLOW ST
MU
LBER
RY S
T
ALLEN ST
PELL ST
FORS
YTH
ST
ABRAHAM KAZAN ST
DUANE ST
MOT
T ST
HAMILL PL
PELL ST
SAMUEL DICKSTEIN PZ
CENTRE ST
ELDRIDGE ST
MOSCO ST DIVISION ST
READE ST
DOYERS ST
LEWIS ST
EAST BROADWAY
LAFAYETTE ST
ELK ST
BOWERY
CLINTON
ST
DIVISION ST
HENRY ST
JEFFERSON
ST
FOLEY SQ
PEARL ST
CATH
ERIN
E ST
EAST BROADWAY
WORTH ST
CHAMBERS ST
HENRY ST
CHATHAM SQ
GRAND ST
EAST BROADWAY
CHATHAM SQ
MADISON ST
MON
TGOMERY ST
EAST BROADWAYHENRY ST
RUTG
ERS
ST
PARK ROW PARK ROW
MADISON STHENRY ST
PIKE
ST
HENRY ST
CENTRE ST
MAR
KET
ST
MADISON ST
OLIV
ER S
T
GOUVER
NEU
R ST
JAM
ES S
T CHERRY STCHERRY ST
BK BR ET RPMADISON ST
PEAR
L ST
BK BR EN RP
PARK ROW
ST JAMES PL
BK BR EN RP
CATH
ERIN
E ST
MADISON ST
ROSE ST
CHERRY STMONROE ST
JACKSON ST
WATER STCHERRY ST
AV O
F TH
E FI
NEST
BK B
R ET R
P
SPRUCE ST
RUTG
ERS
SL
BK BR EN RP
FDR DR W LA
CATH
ERIN
E SL
PIKE
SL
BK BR ET RP
NO
NAM
E
FRANKFORT ST CHERRY ST
BK BR AP
SOUTH ST
BK BR AP
MAR
KET
SL
BK BR EN RP
WATER ST
GOLD ST
FDR DR ET SB
FDR DR ENTRY RP
FDR DR ET SB
SOUTH ST
R F WAGNER SR PL
BK BR EN RP
DOVER STPEARL ST
BK BR EN R
PDO
VER
ST BK BR EN RPCLIFF ST
PECK
SL
PEARL ST
WATER ST
FULT
ON ST
PEARL STFRONT ST
BEEK
MAN S
T
FDR DR EN SB
BROOKLYN BR
E10TH ST BRIDGE
E6TH ST BRIDGE
HOUSTON ST OVERPASS
DELANCEY ST BRIDGE
CORLEARS HOOK BRIDGE
19%
17%
9%
12% 16%
18%
24.1%
16.1%
26%
%KEY:
N
0 ft 500
%
percentage of participants who access the waterfront via a given bridge (CE Round I Results)
percentage of participants who think a given bridge should be improved or replaced (CE Round II Results)
At the end of the roundtable discussions, participants were invited to vote and respond to the following question. Please keep in mind that these results represent a small sample size. The ESCR team will take this information into consideration, along with additional data collection from traffic and pedestrian studies.
COMMENTS: Participant feedback shows that improvements to the Delancey Street Bridge and Houston Street Overpass are priorities for the community. However, it is important to keep in mind that:
- Only 44% (71 out of 161) of workshop participants participated in this vote - Approximately 115,000 residents live in the ESCR Project area - These results have some discrepancies with the survey responses collected during the March workshops - Anecdotal reports indicate that the majority of participants may have been more familiar with bridges located in the south of the Project Area 1
SOUTH NORTH
DELANCEY ST BRIDGE
E10TH ST BRIDGE
HOUSTON ST OVERPASS
E6TH ST BRIDGE
CORLEARS HOOK BRIDGE
11 19 17 13 11 9%
Approximate number of participants who think a given bridge should be improved or replaced
KEY:
x
EAST SIDE COASTAL RESILIENCY PROJECTCOMMUNITY ENGAGEMENT SESSIONS: WATERFRONT CONNECTIONS MAY 19,20,&28 2015
2. ROUNDTABLE DISCUSSION FINDINGS: NEIGHBORHOOD CONNECTIONS IN PA1In addition to participating in discussions which revolved around the five access points to East River Park, participants could choose to join a roundtable which focused on neighborhood connections in Project Area 1. A large neighborhood map highlighting key landmarks was displayed in the center of the table, and participants were prompted to share general positive and negative feedback about access to East River Park. The discusssion session also provided an opportunity to discuss other community concerns which relate to coastal flood protection. The key findings, as summarized below, provide additional information on the East Side community’s priorities and concerns with respect to the ESCR project.
STORMWATER MANAGEMENT: - Participants highlighted the need for effective stormwater management in the neighborhood - There was interest in introducing more rain gardens and increasing the number of street trees - Several participants inquired about the opportunity to integrate community gardens into a larger stormwater management system
LANDSCAPING AND MAINTENANCE: - Many participants saw an opportunity to replant the trees lost during Hurricane Sandy and introduce salt resistant species - There were complaints about poor pest control, defective park lights, and broken water fountains - Several participants suggested that if the maintenance and operations of the park were improved, it would attract more users and become a safer environment - Workshop participants asked about a green jobs training program for local residents
COMMUNITY IMPACTS DURING CONSTRUCTION: - Participants were concerned about losing access to the park and the athletic fields during construction - Several groups noted that two other projects will begin construction around the same time as the ESCR project - Residents emphazised that they value access to the park, the playgrounds, and the waterfront esplanade