keystone(fund(projects(by(county((199462013) · keystone(fund(projects(by(county((199462013)...
TRANSCRIPT
Keystone Fund Projects by County (1994-‐2013)
Page 1 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Adams Adams County North Gettysburg Area Trail Feasibility
KEY-‐TAG-‐3-‐4
$20,000 $20,000 3 Feasibility Studies (COMM)
$40,000 COMM_Key
Adams Adams County North Gettysburg Trail-‐Phase I (Part 1)
BRC-‐PRD-‐8-‐13
$125,000 $69,300 8 Park Rehabilitation and Development (COMM)
$625,000 COMM_Key
Adams Adams County Southwest Adams County Joint Comprehensive Plan
BRC-‐TAG-‐13.6-‐586
$15,000 $15,000 13.6 Greenway Plans (COMM)
$30,000 COMM_Key
Adams Adams County W. Adams County Sub-‐Reg. Park Feas. Study
BRC-‐TAG-‐8-‐14
$20,000 $20,000 8 Feasibility Studies (COMM)
$40,000 COMM_Key
Adams East Berlin Borough Community Park BRC-‐PRD-‐13-‐101
$192,400 $100,000 13 Park Rehabilitation and Development (COMM)
$384,900 COMM_Key
Adams East Berlin Borough East Berlin Park KEY-‐SC-‐3-‐52 $12,000 $12,000 3 Small Communities/Small Projects (COMM)
$12,000 COMM_Key
Adams Gettysburg Borough Biser Fitness Trail and Walking Path
BRC-‐PRD-‐11-‐38
$28,500 $28,500 11 Park Rehabilitation and Development (COMM)
$57,100 COMM_Key
Adams Gettysburg Borough Community Pool Feasibility Study
BRC-‐TAG-‐12.5-‐25
$12,500 $12,500 12.5 Feasibility Studies (COMM)
$25,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 2 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Adams Gettysburg Borough Gettysburg Area Rec. Park Master Site Plan
BRC-‐TAG-‐16-‐59
$20,000 $20,000 16 Master Site Plans (COMM)
$40,000 COMM_Key
Adams Gettysburg Borough Gettysburg Regional Alternative Skate Park
BRC-‐PRD-‐9-‐84
$43,600 $43,000 9 Park Rehabilitation and Development (COMM)
$87,200 COMM_Key
Adams Hamilton Township G.R.E.A.T.R. Greenway Routes for Eastern Adams Transportation
BRC-‐RTP-‐18-‐172
$12,500 $12,500 18 Feasibility Studies (RT)
$25,000 COMM_Key
Adams Hamiltonban Township
Peer-‐to-‐Peer Project Study Multi-‐Municipal Recreation and Park Opportunities -‐ Southwest Adams County Recreational Study
BRC-‐TAG-‐17-‐231
$10,000 $10,000 17 Peer-‐to-‐Peer Tech. Assistance (COMM)
$11,000 COMM_Key
Adams Land Conservancy of Adams County, Inc.
Penn Forestry Conservation Easement
BRC-‐LTA-‐12-‐17
$274,000 $274,000 12 Open Space Acquisition (LT)
$548,000 LT_Key
Adams Latimore Township Latimore Park -‐ Phase 1 Development
BRC-‐SC-‐12-‐103
$40,000 $40,000 12 Small Communities/Small Projects (COMM)
$63,600 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 3 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Adams Latimore Township Township Park KEY-‐SC-‐5-‐108
$20,000 $20,000 5 Small Communities/Small Projects (COMM)
$25,506 COMM_Key
Adams McSherrystown Borough
West Recreation Park
KEY-‐SC-‐3-‐131
$19,000 $19,000 3 Small Communities/Small Projects (COMM)
$30,200 COMM_Key
Adams Mount Joy Township Comp Rec, Pk and Open Space Plan
BRC-‐TAG-‐13-‐197
$30,000 $30,000 13 Comp. Rec., Park, & Open Space Plans (COMM)
$60,000 COMM_Key
Adams Oxford Township Feeser Land Acquisition
BRC-‐ACQ-‐12.5-‐19
$114,400 $114,000 12.5 Acquisition (COMM)
$228,800 COMM_Key
Adams Oxford Township Oxford Township Recreation Park Master Site Plan
BRC-‐TAG-‐13.3-‐483
$17,500 $17,500 13.3 Master Site Plans (COMM)
$35,100 COMM_Key
Adams Strawberry Hill Foundation, Inc.
Gross Minerals Property
BRC-‐LTA-‐6-‐20
$152,500 $127,150 6 Open Space Acquisition (LT)
$305,000 LT_Key
Adams, Cumberland, Franklin, York
Appalachian Trail Conservancy
South Mountain Partnership Implementation 2014
BRC-SR-19-165
$196,760.00 $20,000.00 19 Partnerships Projects
$280,462.00 LT_Key
Adams, Cumberland, Franklin, York
Appalachian Trail Conservancy
South Mountain Partnership Implementation 2014
BRC-SR-19-165
$196,760.00 $20,000.00 19 Partnerships Projects
$280,462.00 LT_Key
Adams, Cumberland, Franklin, York
Appalachian Trail Conservancy
South Mountain Partnership Implementation 2014
BRC-SR-19-165
$196,760.00 $20,000.00 19 Partnerships Projects
$280,462.00 LT_Key
Adams, Cumberland, Franklin, York
Appalachian Trail Conservancy
South Mountain Partnership Implementation 2014
BRC-SR-19-165
$196,760.00 $20,000.00 19 Partnerships Projects
$280,462.00 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 4 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Adams, Cumberland, Franklin, York
Appalachian Trail Conservancy
South Mountain Partnership Implementation 2014
BRC-SR-19-165
$196,760.00 $20,000.00 19 Partnerships Projects
$280,462.00 LT_Key
Adams, Cumberland, Franklin, York
Appalachian Trail Conservancy
South Mountain Partnership Implementation 2014
BRC-SR-19-165
$196,760.00 $20,000.00 19 Partnerships Projects
$280,462.00 LT_Key
Adams, Cumberland, Franklin, York
Appalachian Trail Conservancy
South Mountain Partnership Implementation 2014
BRC-SR-19-165
$196,760.00 $20,000.00 19 Partnerships Projects
$280,462.00 LT_Key
Adams, Cumberland, Franklin, York
Appalachian Trail Conservancy
South Mountain Partnership Implementation 2014
BRC-SR-19-165
$196,760.00 $20,000.00 19 Partnerships Projects
$280,462.00 LT_Key
Adams, Cumberland, Franklin, York
Appalachian Trail Conservancy
South Mountain Partnership Implementation 2014
BRC-SR-19-165
$196,760.00 $20,000.00 19 Partnerships Projects
$280,462.00 LT_Key
Adams, Cumberland, Franklin, York
Appalachian Trail Conservancy
South Mountain Partnership Implementation 2014
BRC-SR-19-165
$196,760.00 $20,000.00 19 Partnerships Projects
$280,462.00 LT_Key
Adams, Cumberland, Franklin, York
Appalachian Trail Conservancy
South Mountain Partnership Implementation 2014
BRC-SR-19-165
$196,760.00 $20,000.00 19 Partnerships Projects
$280,462.00 LT_Key
Adams, Cumberland, Franklin, York
Appalachian Trail Conservancy
South Mountain Partnership Implementation 2014
BRC-SR-19-165
$196,760.00 $20,000.00 19 Partnerships Projects
$280,462.00 LT_Key
Adams, Cumberland, Franklin, York
Appalachian Trail Conservancy
South Mountain Partnership Implementation 2014
BRC-SR-19-165
$196,760.00 $20,000.00 19 Partnerships Projects
$280,462.00 LT_Key
Adams, Cumberland, Franklin, York
Appalachian Trail Conservancy
South Mountain Partnership Implementation 2014
BRC-SR-19-165
$196,760.00 $20,000.00 19 Partnerships Projects
$280,462.00 LT_Key
Adams, Cumberland, York
Pennsylvania Environmental Council, Inc.
Conewago Creek Watershed Conservation Plan
BRC-‐RCP-‐10-‐7
$136,624 $136,000 10 Planning (RIV) $273,248 RIVER_Key
Keystone Fund Projects by County (1994-‐2013)
Page 5 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Adams, Perry Central Pennsylvania Conservancy
Yeager Property/Lowe Estate Property
BRC-‐LTA-‐9-‐4
$244,000 $740,000 9 Critical Habitat Acquisition (LT)
$1,480,000 LT_Key
Allegheny Allegheny County Allegheny County Gateways
BRC-‐PRD-‐6-‐9
$150,000 $150,000 6 Park Rehabilitation and Development (COMM)
$300,000 COMM_Key
Allegheny Allegheny County Boyce Park Snow Tubing Facility
BRC-‐PRD-‐13.3-‐225
$550,000 $200,000 13.3 Park Rehabilitation and Development (COMM)
$1,651,100 COMM_Key
Allegheny Allegheny County Co. Comp. Rec. Plan & Parks Playground Improve.
KEY-‐PRD-‐5-‐4
$500,000 $1,000,000 5 Park Rehabilitation and Development (COMM)
$2,550,000 COMM_Key
Allegheny Allegheny County Montour Trail -‐ Section 5
KEY-‐PRD-‐1-‐2
$50,000 $50,000 1 Park Rehabilitation and Development (COMM)
$100,000 COMM_Key
Allegheny Allegheny County South Park Amphitheater
BRC-‐PRD-‐8-‐15
$487,000 $200,000 8 Park Rehabilitation and Development (COMM)
$974,000 COMM_Key
Allegheny Allegheny County W. Pa Botanical Garden Master Plan/Point State Par
KEY-‐TAG-‐5-‐5
$100,000 $150,000 5 Master Site Plans (COMM)
$208,500 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 6 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Allegheny Allegheny County Redevelopment Authority
Sports and Athletics Complex-‐ Development
BRC-‐PRD-‐18-‐45
$1,400,000 $300,000 18 Park Rehabilitation and Development (COMM)
$2,800,000 COMM_Key
Allegheny Allegheny Land Trust Audubon Greenbelt BRC-‐LTA-‐9-‐3
$1,951,000 $600,000 9 Critical Habitat Acquisition (LT)
$3,902,000 LT_Key
Allegheny Allegheny Land Trust Barking Slopes -‐ GLS Property
BRC-‐LTA-‐7-‐2
$157,000 $100,000 7 Open Space Acquisition (LT)
$314,000 LT_Key
Allegheny Allegheny Land Trust Chartiers Greenway Acquisition -‐ (Phase II)
BRC-‐LTA-‐13.3-‐554
$41,500 $38,000 13.3 Open Space Acquisition (LT)
$83,000 LT_Key
Allegheny Allegheny Land Trust Emerald Link Greenway Acquisition
BRC-‐LTA-‐11.5-‐1
$200,000 $100,000 11.5 Open Space Acquisition (LT)
$400,000 LT_Key
Allegheny Allegheny Land Trust Emerald Link Phase II -‐ Ferrie Acquisition
BRC-‐LTA-‐15-‐112
$100,000 $81,000 15 Open Space Acquisition (LT)
$200,000 LT_Key
Allegheny Allegheny Land Trust Fern Hollow Greenbelt Acquisition
BRC-‐LTA-‐8-‐1
$261,500 $260,000 8 Open Space Acquisition (LT)
$523,000 LT_Key
Allegheny Allegheny Land Trust Liberty Valley BDA Acquisition
BRC-‐LTA-‐14-‐27
$71,500 $39,000 14 Open Space Acquisition (LT)
$182,820 LT_Key
Allegheny Allegheny Land Trust Mid-‐Chartiers Valley Greenway
BRC-‐LTA-‐7-‐3
$230,000 $230,000 7 Open Space Acquisition (LT)
$460,000 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 7 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Allegheny Allegheny Land Trust Montour Run Property
KEY-‐LTA-‐5-‐5 $179,000 $165,000 5 Open Space Acquisition (LT)
$358,000 LT_Key
Allegheny Allegheny Land Trust Pittsburgh Cut Flower
BRC-‐LTA-‐18-‐10
$772,300 $509,500 18 Open Space Acquisition (LT)
$1,544,600 LT_Key
Allegheny Allegheny Land Trust Sycamore Island Acquisition
BRC-‐LTA-‐13.6-‐607
$136,000 $136,000 13.6 Open Space Acquisition (LT)
$272,000 LT_Key
Allegheny Avonworth Municipal Authority
Acord Park Pool Renovation
KEY-‐PRD-‐3-‐8
$95,000 $95,000 3 Park Rehabilitation and Development (COMM)
$190,000 COMM_Key
Allegheny Avonworth Municipal Authority
Avonworth Community Park
KEY-‐PRD-‐5-‐11
$55,974 $55,000 5 Park Rehabilitation and Development (COMM)
$111,947 COMM_Key
Allegheny Avonworth Municipal Authority
Circuit Rider -‐ Year 2 KEY-‐TAG-‐4-‐12
$27,300 $27,300 4 Circuit Rider (COMM)
$36,400 COMM_Key
Allegheny Avonworth Municipal Authority
Circuit Rider-‐ Year 1 KEY-‐TAG-‐3-‐9
$35,000 $35,000 3 Circuit Rider (COMM)
$35,000 COMM_Key
Allegheny Avonworth Municipal Authority
Peer-‐To-‐Peer Project BRC-‐TAG-‐7-‐1
$7,500 $7,500 7 Peer-‐to-‐Peer Tech. Assistance (COMM)
$8,250 COMM_Key
Allegheny Baldwin Township Armstrong Park Playground
BRC-‐SC-‐9-‐13
$40,000 $40,000 9 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 8 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Allegheny Bell Acres Borough Playground Rehab BRC-‐SC-‐11-‐107
$40,000 $40,000 11 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Allegheny Bellevue Borough Andrew Bayne Park -‐ Phase 2 -‐ Development
BRC-‐PRD-‐17-‐104
$60,000 $60,000 17 Park Rehabilitation and Development (COMM)
$120,000 COMM_Key
Allegheny Bellevue Borough Lincoln Playground KEY-‐PRD-‐5-‐15
$87,700 $85,000 5 Park Rehabilitation and Development (COMM)
$175,417 COMM_Key
Allegheny Ben Avon Borough Avon Park KEY-‐SC-‐5-‐16 $20,000 $20,000 5 Small Communities/Small Projects (COMM)
$27,550 COMM_Key
Allegheny Ben Avon Borough Avon Park -‐ Phase 2 -‐Development
BRC-‐SC-‐17-‐28
$39,789 $39,800 17 Small Communities/Small Projects (COMM)
$59,868 COMM_Key
Allegheny Bethel Park Municipality
Baptist Road Park KEY-‐PRD-‐4-‐14
$200,000 $100,000 4 Park Rehabilitation and Development (COMM)
$400,000 COMM_Key
Allegheny Bethel Park Municipality
Comprehensive Recreation & Park Plan
KEY-‐TAG-‐1-‐10
$17,500 $17,500 1 Comp. Rec., Park, & Open Space Plans (COMM)
$35,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 9 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Allegheny Bethel Park Municipality
Millennium Park BRC-‐PRD-‐7-‐19
$100,000 $100,000 7 Park Rehabilitation and Development (COMM)
$200,000 COMM_Key
Allegheny Braddock Borough Library Street Park BRC-‐PRD-‐13.3-‐339
$80,000 $80,000 13.3 Park Rehabilitation and Development (COMM)
$180,000 COMM_Key
Allegheny Braddock Hills Borough
Site Feasibility Study KEY-‐TAG-‐1-‐15
$5,000 $5,000 1 Feasibility Studies (COMM)
$10,000 COMM_Key
Allegheny Bradford Woods Borough
Bradford Woods Park-‐Phase I
KEY-‐SC-‐2-‐16 $20,000 $20,000 2 Small Communities/Small Projects (COMM)
$51,100 COMM_Key
Allegheny Brentwood Borough Brentwood Park KEY-‐PRD-‐2-‐17
$11,000 $11,000 2 Park Rehabilitation and Development (COMM)
$22,000 COMM_Key
Allegheny Bridgeville Borough Chartiers Park KEY-‐PRD-‐4-‐18
$30,000 $30,000 4 Park Rehabilitation and Development (COMM)
$60,100 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 10 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Allegheny Bridgeville Borough McLaughlin Run Park KEY-‐PRD-‐5-‐22
$32,500 $32,000 5 Park Rehabilitation and Development (COMM)
$65,000 COMM_Key
Allegheny Carnegie Borough Carnegie Park Phase 1-‐Development
BRC-‐PRD-‐16-‐126
$145,975 $145,000 16 Park Rehabilitation and Development (COMM)
$291,950 COMM_Key
Allegheny Carnegie Borough Carnegie Park Phase-2-Development
BRC-PRD-19-66
$199,264.00 $199,000.00 19 Park Rehabilitation and Development (COMM)
$441,518.00 COMM_Key
Allegheny Carnegie Borough Carnegie Park Phase-2-Development
BRC-PRD-19-66
$199,264.00 $199,000.00 19 Park Rehabilitation and Development (COMM)
$441,518.00 COMM_Key
Allegheny Carnegie Borough Carnegie Park Phase-2-Development
BRC-PRD-19-66
$199,264.00 $199,000.00 19 Park Rehabilitation and Development (COMM)
$441,518.00 COMM_Key
Allegheny Carnegie Borough Sam Chioda Park KEY-‐PRD-‐3-‐32
$34,000 $34,000 3 Park Rehabilitation and Development (COMM)
$68,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 11 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Allegheny Castle Shannon Borough
Hamilton Park BRC-‐PRD-‐6-‐234
$65,000 $102,500 6 Park Rehabilitation and Development (COMM)
$205,000 COMM_Key
Allegheny Chalfant Borough Chalfant Memorial Park
KEY-‐SC-‐3-‐36 $20,000 $20,000 3 Small Communities/Small Projects (COMM)
$22,700 COMM_Key
Allegheny Char-‐West Council of Governments
Multi-‐Municipal Recreation, Open Space, Greenway and Master Site Plans
BRC-‐TAG-‐15-‐88
$60,000 $55,000 15 Comp. Rec., Park, & Open Space Plans (COMM)
$110,000 COMM_Key
Allegheny Char-‐West Council of Governments
Three Rivers Parkway
KEY-‐PRD-‐4-‐27
$150,000 $100,000 4 Park Rehabilitation and Development (COMM)
$349,978 COMM_Key
Allegheny Chartiers Nature Conservancy
Robinson Run BRC-‐LTA-‐7-‐4
$275,000 $275,000 7 Open Space Acquisition (LT)
$550,000 LT_Key
Allegheny Cheswick Borough MacLean Park-‐ Development
BRC-‐PRD-‐18-‐56
$40,000 $40,000 18 Park Rehabilitation and Development (COMM)
$80,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 12 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Allegheny Collier Township Collier Discovery Path BRC-PRD-19-204
$179,583.50 $80,000.00 19 Park Rehabilitation and Development (COMM)
$502,846.00 COMM_Key
Allegheny Collier Township Collier Discovery Path BRC-PRD-19-204
$179,583.50 $80,000.00 19 Park Rehabilitation and Development (COMM)
$502,846.00 COMM_Key
Allegheny Collier Township Collier Discovery Path BRC-PRD-19-204
$179,583.50 $80,000.00 19 Park Rehabilitation and Development (COMM)
$502,846.00 COMM_Key
Allegheny Collier Township Collier Discovery Path BRC-PRD-19-204
$179,583.50 $80,000.00 19 Park Rehabilitation and Development (COMM)
$502,846.00 COMM_Key
Allegheny Collier Township Comprehensive Recreation, Parks & Open Space Plan
BRC-‐TAG-‐12-‐232
$20,000 $20,000 12 Comp. Rec., Park, & Open Space Plans (COMM)
$40,000 COMM_Key
Allegheny Collier Township Hilltop Park-‐ Development
BRC-‐PRD-‐18-‐58
$149,679 $149,000 18 Park Rehabilitation and Development (COMM)
$299,358 COMM_Key
Allegheny Collier Township Kelly Park BRC-‐TAG-‐7-‐40
$12,500 $12,500 7 Master Site Plans (COMM)
$25,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 13 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Allegheny Collier Township Robinson Run Bridge BRC-‐PRD-‐8-‐47
$41,250 $41,000 8 Park Rehabilitation and Development (COMM)
$82,500 COMM_Key
Allegheny Collier Township Skvarca Park, Webb Field, and Nike Park -‐ Development
BRC-‐PRD-‐17-‐112
$105,000 $105,000 17 Park Rehabilitation and Development (COMM)
$210,400 COMM_Key
Allegheny Collier Township Three Sites KEY-‐SC-‐4-‐35 $20,000 $20,000 4 Small Communities/Small Projects (COMM)
$30,000 COMM_Key
Allegheny Coraopolis Borough Ridge Avenue Tot Lot
KEY-‐PRD-‐3-‐41
$64,900 $40,000 3 Park Rehabilitation and Development (COMM)
$150,100 COMM_Key
Allegheny Crafton Borough Crafton Parks Master Site Plan
BRC-‐TAG-‐16-‐55
$35,000 $35,000 16 Master Site Plans (COMM)
$70,000 COMM_Key
Allegheny Crafton Borough Duncan Property KEY-‐ACQ-‐5-‐237
$82,000 $100,000 5 Acquisition (COMM)
$164,000 COMM_Key
Allegheny Crescent Township Huntsridge Park BRC-‐SC-‐11-‐115
$40,000 $40,000 11 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 14 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Allegheny Dormont Borough Beggs Snyder Park KEY-‐PRD-‐2-‐37
$64,000 $64,000 2 Park Rehabilitation and Development (COMM)
$159,203 COMM_Key
Allegheny Dormont Borough Dormont Pool Improvement Study
BRC-‐TAG-‐6-‐53
$10,000 $10,000 6 Feasibility Studies (COMM)
$20,000 COMM_Key
Allegheny Dormont Borough Master Site Development Plan
KEY-‐TAG-‐3-‐48
$16,400 $16,400 3 Master Site Plans (COMM)
$32,900 COMM_Key
Allegheny Dormont Borough Peer to Peer BRC-‐TAG-‐13-‐36
$10,000 $10,000 13 Peer-‐to-‐Peer Tech. Assistance (COMM)
$11,000 COMM_Key
Allegheny Duquesne City Polish Hill Ballfield BRC-‐PRD-‐11-‐26
$15,000 $15,000 11 Park Rehabilitation and Development (COMM)
$30,000 COMM_Key
Allegheny East McKeesport Borough
Chicora Street Playground
KEY-‐SC-‐3-‐54 $20,000 $20,000 3 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Allegheny Edgewood Borough Comprehensive Plan/Master Site Plan
BRC-‐TAG-‐6-‐59
$20,000 $20,000 6 Comp. Rec., Park, & Open Space Plans (COMM)
$40,000 COMM_Key
Allegheny Edgewood Borough Feasibility Study KEY-‐RTP-‐3-‐6 $15,000 $15,000 3 Feasibility Studies (RT)
$30,000 RT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 15 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Allegheny Edgewood Borough Koenig Park-‐ Development
BRC-‐PRD-‐18-‐68
$54,000 $54,000 18 Park Rehabilitation and Development (COMM)
$116,500 COMM_Key
Allegheny Edgeworth Borough Ohio River Boulevard Feasibility Study
BRC-‐TAG-‐14-‐201
$10,000 $10,000 14 Feasibility Studies (COMM)
$20,000 COMM_Key
Allegheny Elizabeth Township Buena Vista Park Boat Launch
BRC-‐PRD-‐7-‐65
$20,928 $20,000 7 Park Rehabilitation and Development (COMM)
$41,856 COMM_Key
Allegheny Elizabeth Township Chapel Fellowship and Quail Creek Dev. Acquisitions
BRC-‐ACQ-‐14-‐55
$307,800 $307,000 14 Acquisition (COMM)
$615,500 COMM_Key
Allegheny Elizabeth Township Rec Complex Feasiiblity Study-‐Round Hill Park
BRC-‐TAG-‐11-‐204
$15,100 $15,000 11 Feasibility Studies (COMM)
$30,200 COMM_Key
Allegheny Emsworth Borough Marmo Park BRC-‐SC-‐8-‐63
$37,000 $37,000 8 Small Communities/Small Projects (COMM)
$102,000 COMM_Key
Allegheny Etna Borough Playground Improvements
BRC-‐PRD-‐8-‐67
$49,000 $49,000 8 Park Rehabilitation and Development (COMM)
$98,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 16 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Allegheny Findlay Township Community Park KEY-‐SC-‐5-‐66 $16,400 $16,400 5 Small Communities/Small Projects (COMM)
$24,497 COMM_Key
Allegheny Findlay Township Recreation and Sports Complex
BRC-‐PRD-‐10-‐117
$150,000 $100,000 10 Park Rehabilitation and Development (COMM)
$300,000 COMM_Key
Allegheny Forest Hills Borough Forest Hills Park KEY-‐PRD-‐3-‐66
$37,000 $37,000 3 Park Rehabilitation and Development (COMM)
$74,100 COMM_Key
Allegheny Forest Hills Borough Four Sites KEY-‐PRD-‐2-‐50
$25,000 $25,000 2 Park Rehabilitation and Development (COMM)
$50,400 COMM_Key
Allegheny Franklin Park Borough
3 Sites BRC-‐PRD-‐6-‐70
$60,000 $60,000 6 Park Rehabilitation and Development (COMM)
$120,000 COMM_Key
Allegheny Franklin Park Borough
Blueberry Hill Park BRC-‐PRD-‐13-‐360
$26,600 $26,600 13 Park Rehabilitation and Development (COMM)
$53,100 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 17 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Allegheny Franklin Park Borough
Blueberry Hill Park Pavillion
BRC-‐PRD-‐11-‐36
$77,900 $77,900 11 Park Rehabilitation and Development (COMM)
$155,800 COMM_Key
Allegheny Franklin Park Borough
Comp. Plan & Master Site Plan
KEY-‐TAG-‐5-‐69
$20,000 $20,000 5 Comp. Rec., Park, & Open Space Plans (COMM)
$40,000 COMM_Key
Allegheny Friends of the Riverfront, Inc.
Millvale River Trail Plan
KEY-‐RTP-‐5-‐4 $35,000 $35,000 5 Feasibility Studies (RT)
$70,000 RT_Key
Allegheny Friends of the Riverfront, Inc.
Three Rivers Heritage Trail
KEY-‐RTA-‐95-‐12
$69,000 $69,000 1 Acquisition (RT) $370,000 RT_Key
Allegheny Friends of the Riverfront, Inc.
Three Rivers Heritage Trail
KEY-‐RTD-‐5-‐5
$75,000 $86,300 5 Rail Rehabilitation and Development (RT)
$315,221 RT_Key
Allegheny Friends of the Riverfront, Inc.
Three Rivers Heritage Trail/Mon. River Section
KEY-‐RTP-‐4-‐10
$50,000 $25,000 4 Master Plans (RT)
$100,000 RT_Key
Allegheny Glassport Borough 3rd & 9th Streets Playgrounds
BRC-‐SC-‐11-‐126
$20,000 $20,000 11 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Allegheny Green Tree Borough Green Tree Park BRC-‐PRD-‐13-‐368
$163,000 $102,000 13 Park Rehabilitation and Development (COMM)
$326,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 18 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Allegheny Green Tree Borough Hale Park KEY-‐SC-‐3-‐75 $10,000 $10,000 3 Small Communities/Small Projects (COMM)
$24,000 COMM_Key
Allegheny Green Tree Borough Suella Park BRC-‐PRD-‐6-‐75
$47,500 $47,500 6 Park Rehabilitation and Development (COMM)
$95,000 COMM_Key
Allegheny Hampton Township Community Park KEY-‐PRD-‐2-‐58
$60,000 $65,000 2 Park Rehabilitation and Development (COMM)
$130,000 COMM_Key
Allegheny Hampton Township Community Park -‐ Phase II
KEY-‐PRD-‐3-‐81
$68,300 $68,300 3 Park Rehabilitation and Development (COMM)
$136,600 COMM_Key
Allegheny Harmar Township Terrace Drive Park BRC-‐SC-‐7-‐82
$40,000 $30,000 7 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Allegheny Harrison Township Natrona Recreation and Art Park
BRC-‐PRD-‐14-‐145
$41,000 $41,000 14 Park Rehabilitation and Development (COMM)
$82,500 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 19 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Allegheny Heidelberg Borough Borough Park BRC-‐PRD-‐13-‐107
$114,200 $100,000 13 Park Rehabilitation and Development (COMM)
$228,400 COMM_Key
Allegheny Heidelberg Borough Ellsworth Avenue Playground-Development
BRC-PRD-19-82
$65,120.00 $45,200.00 19 Park Rehabilitation and Development (COMM)
$130,240.00 COMM_Key
Allegheny Heidelberg Borough Ellsworth Avenue Playground-Development
BRC-PRD-19-82
$65,120.00 $45,200.00 19 Park Rehabilitation and Development (COMM)
$130,240.00 COMM_Key
Allegheny Heidelberg Borough Ellsworth Avenue Playground-Development
BRC-PRD-19-82
$65,120.00 $45,200.00 19 Park Rehabilitation and Development (COMM)
$130,240.00 COMM_Key
Allegheny Heidelberg Borough Heidelberg Park-‐Development
BRC-‐PRD-‐16-‐138
$46,560 $46,500 16 Park Rehabilitation and Development (COMM)
$93,120 COMM_Key
Allegheny Hollow Oak Land Trust
Anchor Supply Property
KEY-‐LTA-‐3-‐6 $51,700 $40,000 3 Open Space Acquisition (LT)
$150,000 LT_Key
Allegheny Hollow Oak Land Trust
Komichak Property Acquisition
BRC-‐LTA-‐15-‐118
$22,000 $22,000 15 Open Space Acquisition (LT)
$45,650 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 20 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Allegheny Hollow Oak Land Trust
Montour Run Watershed Conservation Plan
KEY-‐RCP-‐96-‐15
$40,000 $56,500 3 Planning (RIV) $96,500 RIVER_Key
Allegheny Hollow Oak Land Trust
Trieschock Property Acquisition
BRC-‐LTA-‐11-‐13
$85,000 $85,000 11 Open Space Acquisition (LT)
$170,200 LT_Key
Allegheny Homestead Borough 16th Ave, McLean & Sullivan Playgrounds & Frick Pk
BRC-‐PRD-‐9-‐94
$40,000 $40,000 9 Park Rehabilitation and Development (COMM)
$80,000 COMM_Key
Allegheny Homestead Borough Peer-‐to-‐Peer KEY-‐TAG-‐3-‐92
$7,500 $7,500 3 Peer-‐to-‐Peer Tech. Assistance (COMM)
$8,250 COMM_Key
Allegheny Indiana Township Community Swimming Pool Feasibility Study
BRC-‐TAG-‐6-‐86
$12,500 $12,500 6 Feasibility Studies (COMM)
$25,000 COMM_Key
Allegheny Indiana Township Connomacher Property Acquisition
BRC-‐ACQ-‐16-‐23
$150,000 $150,000 16 Acquisition (COMM)
$300,000 COMM_Key
Allegheny Indiana Township Emmerling Park BRC-‐PRD-‐11-‐46
$125,000 $125,000 11 Park Rehabilitation and Development (COMM)
$378,700 COMM_Key
Allegheny Indiana Township Middle Road and Emmerling Parks
BRC-‐PRD-‐8-‐89
$65,600 $65,000 8 Park Rehabilitation and Development (COMM)
$143,500 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 21 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Allegheny Indiana Township Middle Road Park KEY-‐PRD-‐5-‐94
$25,337 $25,000 5 Park Rehabilitation and Development (COMM)
$50,673 COMM_Key
Allegheny Ingram Borough Foster Park BRC-‐SC-‐10-‐83
$27,400 $25,000 10 Small Communities/Small Projects (COMM)
$54,800 COMM_Key
Allegheny Ingram Borough Foster Park KEY-‐PRD-‐4-‐70
$58,600 $55,000 4 Park Rehabilitation and Development (COMM)
$117,200 COMM_Key
Allegheny Jefferson Borough Gill Hall Park -‐ Phase II
KEY-‐PRD-‐4-‐72
$38,300 $38,000 4 Park Rehabilitation and Development (COMM)
$76,600 COMM_Key
Allegheny Jefferson Borough Master Site Development Plan
KEY-‐TAG-‐2-‐68
$4,000 $4,000 2 Master Site Plans (COMM)
$8,000 COMM_Key
Allegheny Jefferson Hills Borough
Beedle Park -‐ Phase 1-‐ Development
BRC-‐PRD-‐18-‐74
$174,786 $100,000 18 Park Rehabilitation and Development (COMM)
$349,571 COMM_Key
Allegheny Jefferson Hills Borough
Beedle Park-Phase-1B-Development
BRC-PRD-19-85
$126,696.00 $110,000.00 19 Park Rehabilitation and Development (COMM)
$253,392.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 22 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Allegheny Jefferson Hills Borough
Beedle Park-Phase-1B-Development
BRC-PRD-19-85
$126,696.00 $110,000.00 19 Park Rehabilitation and Development (COMM)
$253,392.00 COMM_Key
Allegheny Jefferson Hills Borough
Beedle Park-Phase-1B-Development
BRC-PRD-19-85
$126,696.00 $110,000.00 19 Park Rehabilitation and Development (COMM)
$253,392.00 COMM_Key
Allegheny Jefferson Hills Borough
Comprehensive Rec. Park & Open Space Plan
BRC-‐TAG-‐13.3-‐475
$22,000 $22,000 13.3 Comp. Rec., Park, & Open Space Plans (COMM)
$44,000 COMM_Key
Allegheny Jefferson Hills Borough
Gill Hall Park BRC-‐PRD-‐6-‐88
$50,000 $50,000 6 Park Rehabilitation and Development (COMM)
$100,000 COMM_Key
Allegheny Jefferson Hills Borough
Peters Creek Greenway Plan
BRC-‐TAG-‐7-‐92
$12,500 $12,500 7 Greenway Plans (COMM)
$25,000 COMM_Key
Allegheny Kennedy Township Fairhaven Park BRC-‐PRD-‐13.3-‐377
$30,000 $30,000 13.3 Park Rehabilitation and Development (COMM)
$60,000 COMM_Key
Allegheny Leetsdale Borough Henle Park KEY-‐SC-‐5-‐110
$17,600 $17,600 5 Small Communities/Small Projects (COMM)
$33,600 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 23 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Allegheny Leetsdale Borough Riverfront Greenway Master Plan
BRC-‐TAG-‐11-‐216
$10,000 $10,000 11 Master Site Plans (COMM)
$20,000 COMM_Key
Allegheny Liberty Borough Liberty Park BRC-‐SC-‐12-‐105
$20,000 $20,000 12 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Allegheny Liberty Borough Liberty, Manor and Memory Lane Parks
BRC-‐SC-‐9-‐115
$13,000 $33,000 9 Small Communities/Small Projects (COMM)
$46,000 COMM_Key
Allegheny Lincoln Borough Bell Bridge Field KEY-‐ACQ-‐2-‐83
$19,000 $15,000 2 Acquisition (COMM)
$38,000 COMM_Key
Allegheny Marshall Township Comprehensive Recreation, Park and Open Space Plan
BRC-‐TAG-‐13-‐195
$20,000 $20,000 13 Comp. Rec., Park, & Open Space Plans (COMM)
$40,000 COMM_Key
Allegheny Marshall Township Marshall Township Brush Creek Trail Development
BRC-‐PRD-‐17-‐136
$240,499 $240,000 17 Park Rehabilitation and Development (COMM)
$480,998 COMM_Key
Allegheny Marshall Township Two Sites KEY-‐PRD-‐4-‐97
$332,000 $100,000 4 Park Rehabilitation and Development (COMM)
$663,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 24 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Allegheny McCandless Town Vestal Field BRC-‐PRD-‐10-‐125
$68,000 $60,000 10 Park Rehabilitation and Development (COMM)
$187,493 COMM_Key
Allegheny McCandless Town Vincentian Recreation Complex
BRC-‐PRD-‐6-‐109
$65,000 $65,000 6 Park Rehabilitation and Development (COMM)
$246,465 COMM_Key
Allegheny McKees Rocks Borough
Rangers Field BRC-‐PRD-‐11-‐55
$100,800 $60,000 11 Park Rehabilitation and Development (COMM)
$201,700 COMM_Key
Allegheny McKeesport City Riverview Playground
KEY-‐PRD-‐1-‐81
$48,647 $48,600 1 Park Rehabilitation and Development (COMM)
$97,295 COMM_Key
Allegheny McKeesport City Tenth Ward Boat Launch
BRC-‐RCD-‐8-‐23
$17,000 $22,000 8 Development (RIV)
$34,000 RIVER_Key
Allegheny McKeesport City Two Sites KEY-‐PRD-‐2-‐95
$133,450 $133,400 2 Park Rehabilitation and Development (COMM)
$266,900 COMM_Key
Allegheny McKeesport City Yough River Trail Connection
KEY-‐RTA-‐3-‐12
$158,000 $100,000 3 Acquisition (RT) $200,000 RT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 25 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Allegheny McKeesport City Youghiogheny Linear Park Master Plan
KEY-‐TAG-‐4-‐98
$15,000 $15,000 4 Master Site Plans (COMM)
$30,000 COMM_Key
Allegheny McKeesport City Youghiogheny River Trail
KEY-‐RTD-‐5-‐8
$47,000 $35,000 5 Rail Rehabilitation and Development (RT)
$94,000 RT_Key
Allegheny McKeesport City Youghiogheny River Trail 15th-‐11th St.
KEY-‐RTD-‐4-‐13
$30,000 $30,000 4 Rail Rehabilitation and Development (RT)
$60,000 RT_Key
Allegheny Millvale Borough Community Park KEY-‐SC-‐2-‐101
$20,000 $20,000 2 Small Communities/Small Projects (COMM)
$146,766 COMM_Key
Allegheny Millvale Borough Millvale River Trail & Park
BRC-‐PRD-‐6-‐114
$65,000 $65,000 6 Park Rehabilitation and Development (COMM)
$130,000 COMM_Key
Allegheny Millvale Borough Riverfront Trail BRC-‐SC-‐10-‐90
$40,000 $40,000 10 Small Communities/Small Projects (COMM)
$65,000 COMM_Key
Allegheny Millvale Borough Riverfront Trail Phase 2 Development, Back Channel Bridge
BRC-‐PRD-‐12-‐172
$40,000 $40,000 12 Park Rehabilitation and Development (COMM)
$80,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 26 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Allegheny Monroeville Municipality
Beechwood Park KEY-‐PRD-‐3-‐141
$25,000 $25,000 3 Park Rehabilitation and Development (COMM)
$50,000 COMM_Key
Allegheny Monroeville Municipality
Comprehensive and Master Site Plans
KEY-‐TAG-‐3-‐142
$25,000 $25,000 3 Comp. Rec., Park, & Open Space Plans (COMM)
$50,000 COMM_Key
Allegheny Monroeville Municipality
Monroeville Park System Rehabilitation -‐ Phase IV
BRC-‐PRD-‐9-‐138
$300,000 $200,000 9 Park Rehabilitation and Development (COMM)
$671,400 COMM_Key
Allegheny Montour Trail Council
Montour Trail -‐ Phase 10
KEY-‐RTD-‐4-‐14
$130,000 $100,000 4 Rail Rehabilitation and Development (RT)
$260,000 RT_Key
Allegheny Montour Trail Council
Montour Trail -‐ Phase 8E3 (Piney Fork Run Bridge)
BRC-‐RTD-‐10-‐9
$94,000 $90,000 10 Rail Rehabilitation and Development (RT)
$194,500 RT_Key
Allegheny Montour Trail Council
Montour Trail Extension
KEY-‐RTA-‐3-‐14
$15,000 $13,500 3 Acquisition (RT) $27,000 RT_Key
Allegheny Montour Trail Council
Montour Trail Restoration
BRC-‐RTD-‐11-‐8
$200,000 $50,000 11 Rail Rehabilitation and Development (RT)
$517,000 RT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 27 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Allegheny Moon Township Bon Air Golf Course Acquisition
BRC-‐ACQ-‐11-‐254
$1,285,500 $300,000 11 Acquisition (COMM)
$2,571,000 COMM_Key
Allegheny Moon Township Moon Park KEY-‐PRD-‐5-‐137
$61,795 $60,000 5 Park Rehabilitation and Development (COMM)
$123,590 COMM_Key
Allegheny Moon Township Moon Park Master Plan
BRC-‐TAG-‐12-‐253
$23,200 $23,200 12 Master Site Plans (COMM)
$46,500 COMM_Key
Allegheny Moon Township Moon Waterfront Park Master Site Plan
BRC-‐TAG-‐16-‐65
$30,000 $30,000 16 Master Site Plans (COMM)
$60,000 COMM_Key
Allegheny Moon Township Olson Property Acquisition
BRC-‐ACQ-‐7-‐134
$22,500 $22,000 7 Acquisition (COMM)
$45,000 COMM_Key
Allegheny Mount Lebanon Municipality
Comp. Recreation, Park & Open Space Plan
KEY-‐TAG-‐5-‐138
$20,000 $20,000 5 Comp. Rec., Park, & Open Space Plans (COMM)
$40,000 COMM_Key
Allegheny Mount Lebanon Municipality
Ice Rink Rehabilitation
BRC-‐PRD-‐9-‐141
$324,600 $150,000 9 Park Rehabilitation and Development (COMM)
$649,000 COMM_Key
Allegheny Mount Lebanon Municipality
Main Park BRC-‐PRD-‐7-‐135
$32,000 $32,000 7 Park Rehabilitation and Development (COMM)
$64,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 28 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Allegheny Mount Lebanon Municipality
Main Park KEY-‐PRD-‐3-‐146
$30,000 $30,000 3 Park Rehabilitation and Development (COMM)
$60,000 COMM_Key
Allegheny Mount Oliver Borough
Ormsby Park KEY-‐PRD-‐3-‐147
$15,000 $15,000 3 Park Rehabilitation and Development (COMM)
$30,000 COMM_Key
Allegheny Mount Oliver Borough Ormsby Park Phase 2-Development
BRC-PRD-19-99
$95,054.40 $95,000.00 19 Park Rehabilitation and Development (COMM)
$190,108.80 COMM_Key
Allegheny Mount Oliver Borough Ormsby Park Phase 2-Development
BRC-PRD-19-99
$95,054.40 $95,000.00 19 Park Rehabilitation and Development (COMM)
$190,108.80 COMM_Key
Allegheny Mount Oliver Borough Ormsby Park Phase 2-Development
BRC-PRD-19-99
$95,054.40 $95,000.00 19 Park Rehabilitation and Development (COMM)
$190,108.80 COMM_Key
Allegheny Mount Oliver Borough
Transverse Park BRC-‐SC-‐11-‐138
$40,000 $40,000 11 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 29 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Allegheny Munhall Borough Kennedy and Park Square Parks
KEY-‐PRD-‐3-‐148
$120,000 $100,000 3 Park Rehabilitation and Development (COMM)
$276,700 COMM_Key
Allegheny Munhall Borough Woodhill Park Master Plan
KEY-‐TAG-‐4-‐110
$10,000 $10,000 4 Master Site Plans (COMM)
$20,000 COMM_Key
Allegheny National Aviary in Pittsburgh, Inc.
Education/Discovery Complex
KEY-‐ZOO-‐94-‐5
$150,000 $150,000 1 Zoo $300,000 COMM_Key
Allegheny National Aviary in Pittsburgh, Inc.
Flight Zone Theatre BRC-‐PRD-‐13-‐129
$2,000,000 $200,000 13 Park Rehabilitation and Development (COMM)
$4,000,000 COMM_Key
Allegheny North Area Environmental Council
Pine Creek Watershed River Conservation Plan
BRC-‐RCP-‐12-‐10
$84,100 $65,000 12 Planning (RIV) $168,300 RIVER_Key
Allegheny North Fayette Township
Amphitheater BRC-‐PRD-‐12-‐178
$192,400 $145,000 12 Park Rehabilitation and Development (COMM)
$384,800 COMM_Key
Allegheny North Fayette Township
Hankey Farms Pool Study
BRC-‐TAG-‐13-‐200
$15,000 $10,000 13 Feasibility Studies (COMM)
$30,000 COMM_Key
Allegheny North Fayette Township
Peer-‐to-‐Peer KEY-‐TAG-‐2-‐183
$7,500 $7,500 2 Peer-‐to-‐Peer Tech. Assistance (COMM)
$8,250 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 30 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Allegheny North Fayette Township
Two Sites BRC-‐PRD-‐6-‐128
$56,350 $50,000 6 Park Rehabilitation and Development (COMM)
$112,700 COMM_Key
Allegheny North Versailles Township
Comprehensive Recreation, Park and Open Space Plan
BRC-‐TAG-‐7-‐140
$15,000 $15,000 7 Comp. Rec., Park, & Open Space Plans (COMM)
$30,000 COMM_Key
Allegheny North Versailles Township
Fairhaven and Keith Parks
KEY-‐PRD-‐3-‐157
$53,000 $53,000 3 Park Rehabilitation and Development (COMM)
$106,000 COMM_Key
Allegheny North Versailles Township
Seven Sites BRC-‐PRD-‐10-‐130
$72,600 $50,000 10 Park Rehabilitation and Development (COMM)
$145,000 COMM_Key
Allegheny O'Hara Township Riverfront Trail -‐ Phase I
BRC-‐PRD-‐11-‐63
$250,000 $150,000 11 Park Rehabilitation and Development (COMM)
$775,000 COMM_Key
Allegheny O'Hara Township St. Mary's Church Ballfield Acquisition
BRC-‐ACQ-‐11.5-‐12
$116,200 $116,000 11.5 Acquisition (COMM)
$232,500 COMM_Key
Allegheny Oakdale Borough Borough Park BRC-‐SC-‐11-‐141
$20,000 $20,000 11 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 31 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Allegheny Oakmont Borough Oakmont Riverside Park-‐Development
BRC-‐PRD-‐16-‐151
$270,000 $250,000 16 Park Rehabilitation and Development (COMM)
$675,000 COMM_Key
Allegheny Oakmont Borough Riverside Park Master Site Plan
BRC-‐TAG-‐14-‐227
$22,500 $22,500 14 Master Site Plans (COMM)
$45,000 COMM_Key
Allegheny Ohio Township Community Park BRC-‐PRD-‐7-‐145
$500,000 $250,000 7 Park Rehabilitation and Development (COMM)
$1,000,000 COMM_Key
Allegheny Ohio Township Community Park -‐ Phase II
BRC-‐PRD-‐8-‐141
$250,000 $250,000 8 Park Rehabilitation and Development (COMM)
$500,000 COMM_Key
Allegheny Ohio Township Community Parks Master Plans
KEY-‐TAG-‐5-‐152
$16,250 $16,200 5 Master Site Plans (COMM)
$37,500 COMM_Key
Allegheny Penn Hills Municipality
Duff Park KEY-‐PRD-‐3-‐163
$12,800 $12,800 3 Park Rehabilitation and Development (COMM)
$25,700 COMM_Key
Allegheny Penn Hills Municipality
Six Sites BRC-‐PRD-‐6-‐139
$199,462 $130,000 6 Park Rehabilitation and Development (COMM)
$398,924 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 32 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Allegheny Pennsbury Village Borough
Pennsbury Park BRC-‐SC-‐11-‐146
$24,500 $24,500 11 Small Communities/Small Projects (COMM)
$29,100 COMM_Key
Allegheny Pennsylvania Environmental Council, Inc.
Pittsburgh's Three Rivers Conservation Plan
BRC-‐RCP-‐7-‐12
$135,000 $135,000 7 Planning (RIV) $270,000 RIVER_Key
Allegheny Pine Township Community Center-‐-‐Phase I
BRC-‐PRD-‐13-‐412
$250,000 $250,000 13 Park Rehabilitation and Development (COMM)
$500,000 COMM_Key
Allegheny Pine Township Community Park KEY-‐PRD-‐2-‐124
$73,925 $73,900 2 Park Rehabilitation and Development (COMM)
$147,850 COMM_Key
Allegheny Pine Township Multi-‐Municipal Pool Feasibility Study
BRC-‐TAG-‐8-‐156
$6,500 $6,500 8 Feasibility Studies (COMM)
$13,000 COMM_Key
Allegheny Pine Township Pine Community Park-Development
BRC-PRD-19-105
$72,657.00 $72,500.00 19 Park Rehabilitation and Development (COMM)
$145,314.00 COMM_Key
Allegheny Pine Township Pine Community Park-Development
BRC-PRD-19-105
$72,657.00 $72,500.00 19 Park Rehabilitation and Development (COMM)
$145,314.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 33 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Allegheny Pine Township Pine Community Park-Development
BRC-PRD-19-105
$72,657.00 $72,500.00 19 Park Rehabilitation and Development (COMM)
$145,314.00 COMM_Key
Allegheny Pitcairn Borough Sugar Camp Park KEY-‐SC-‐1-‐108
$13,330 $13,300 1 Small Communities/Small Projects (COMM)
$19,490 COMM_Key
Allegheny Pittsburgh City Athletic Fields Feasibility Study
KEY-‐TAG-‐5-‐163
$30,000 $30,000 5 Feasibility Studies (COMM)
$60,000 COMM_Key
Allegheny Pittsburgh City Bike and Blade Station
BRC-‐PRD-‐8-‐157
$100,000 $100,000 8 Park Rehabilitation and Development (COMM)
$892,800 COMM_Key
Allegheny Pittsburgh City Chartiers/Ohio Master Plan
KEY-‐RTP-‐5-‐13
$17,500 $17,500 5 Master Plans (RT)
$35,000 RT_Key
Allegheny Pittsburgh City Chateau II BRC-‐RTD-‐7-‐12
$120,000 $120,000 7 Rail Rehabilitation and Development (RT)
$240,000 RT_Key
Allegheny Pittsburgh City City-‐wide Pool Feasibility Study
KEY-‐TAG-‐4-‐128
$35,000 $50,000 4 Feasibility Studies (COMM)
$100,000 COMM_Key
Allegheny Pittsburgh City Commons Park -‐ Development
BRC-‐PRD-‐17-‐147
$50,000 $50,000 17 Park Rehabilitation and Development (COMM)
$100,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 34 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Allegheny Pittsburgh City Downtown/Oakland Riverview Trail (Eliza Furnace)
KEY-‐RTD-‐3-‐17
$100,000 $100,000 3 Rail Rehabilitation and Development (RT)
$2,790,000 RT_Key
Allegheny Pittsburgh City Emerald View Park: Fort Pitt Tunnel Trail Connection -‐ Development
BRC-‐PRD-‐18-‐178
$213,064 $133,000 18 Park Rehabilitation and Development (COMM)
$266,330 COMM_Key
Allegheny Pittsburgh City Four Sites KEY-‐PRD-‐5-‐164
$250,000 $250,000 5 Park Rehabilitation and Development (COMM)
$500,000 COMM_Key
Allegheny Pittsburgh City Heritage Trail/Riverfront Park
KEY-‐ACQ-‐2-‐126
$53,600 $50,000 2 Acquisition (COMM)
$107,200 COMM_Key
Allegheny Pittsburgh City Master Site Development Plans
KEY-‐TAG-‐3-‐173
$160,000 $160,000 3 Master Site Plans (COMM)
$320,000 COMM_Key
Allegheny Pittsburgh City Natural Areas Study BRC-‐TAG-‐11.5-‐32
$56,300 $86,975 11.5 Conservation/Sound Land Use (COMM)
$241,000 COMM_Key
Allegheny Pittsburgh City Nine Mile Run KEY-‐RCP-‐96-‐17
$65,000 $65,000 3 Planning (RIV) $130,000 RIVER_Key
Allegheny Pittsburgh City North Shore of the Ohio Trail
KEY-‐RTA-‐5-‐14
$95,000 $95,000 5 Acquisition (RT) $190,000 RT_Key
Allegheny Pittsburgh City North Shore Trail KEY-‐ACQ-‐1-‐110
$100,000 $100,000 1 Acquisition (COMM)
$350,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 35 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Allegheny Pittsburgh City Panther Hollow KEY-‐PRD-‐4-‐129
$223,000 $223,000 4 Park Rehabilitation and Development (COMM)
$446,000 COMM_Key
Allegheny Pittsburgh City Route 28 Trail BRC-‐PRD-‐13.3-‐565
$1,000,000 $500,000 13.3 Park Rehabilitation and Development (COMM)
$2,000,000 COMM_Key
Allegheny Pittsburgh City Washington's Landing
KEY-‐PRD-‐2-‐125
$425,000 $250,000 2 Park Rehabilitation and Development (COMM)
$868,700 COMM_Key
Allegheny Pleasant Hills Borough
Mowry Park KEY-‐PRD-‐2-‐128
$50,000 $50,000 2 Park Rehabilitation and Development (COMM)
$100,000 COMM_Key
Allegheny Pleasant Hills Borough
Mowry Park KEY-‐PRD-‐3-‐177
$25,000 $25,000 3 Park Rehabilitation and Development (COMM)
$50,000 COMM_Key
Allegheny Port Authority of Allegheny County
Gateway Station Plaza
BRC-‐PRD-‐13-‐415
$1,100,000 $200,000 13 Park Rehabilitation and Development (COMM)
$2,200,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 36 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Allegheny Port Vue Borough Jim Campbell Field-‐ Development
BRC-‐SC-‐18-‐39
$32,500 $32,500 18 Small Communities/Small Projects (COMM)
$45,700 COMM_Key
Allegheny Port Vue Borough Recreation Complex KEY-‐PRD-‐2-‐129
$30,000 $30,000 2 Park Rehabilitation and Development (COMM)
$60,000 COMM_Key
Allegheny Regional Trail Corporation
Union Railroad Property Acquisition
BRC-‐RTA-‐12-‐1
$76,900 $76,900 12 Acquisition (RT) $153,700 RT_Key
Allegheny Regional Trail Corporation
US Steel Acquisition BRC-‐RTA-‐11-‐11
$250,000 $200,000 11 Acquisition (RT) $1,100,000 RT_Key
Allegheny Regional Trail Corporation
Youghiogheny River Trail -‐ Phase 4
KEY-‐RTD-‐4-‐18
$160,000 $100,000 4 Rail Rehabilitation and Development (RT)
$323,300 RT_Key
Allegheny Reserve Township Spring Garden Park KEY-‐SC-‐1-‐115
$19,500 $19,500 1 Small Communities/Small Projects (COMM)
$21,450 COMM_Key
Allegheny Richland Township Comp. Rec. Park & Open Space Plan
BRC-‐TAG-‐13.6-‐604
$20,000 $20,000 13.6 Comp. Rec., Park, & Open Space Plans (COMM)
$40,000 COMM_Key
Allegheny Richland Township Richland Park BRC-‐PRD-‐13.3-‐421
$200,000 $200,000 13.3 Park Rehabilitation and Development (COMM)
$635,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 37 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Allegheny Riverlife Mon Wharf Switchback
BRC-‐PRD-‐16-‐246
$1,000,000 $7,225 16 Park Rehabilitation and Development (COMM)
$2,000,000 RIVER_Key
Allegheny Robinson Township Comprehensive Park, Recreation and Open Space Plan
BRC-‐TAG-‐13-‐204
$21,000 $21,000 13 Comp. Rec., Park, & Open Space Plans (COMM)
$42,000 COMM_Key
Allegheny Ross Township Ann Alison Hoover Memorial Park
BRC-‐PRD-‐8-‐162
$40,000 $25,000 8 Park Rehabilitation and Development (COMM)
$99,700 COMM_Key
Allegheny Ross Township Community Park BRC-‐PRD-‐6-‐159
$300,000 $100,000 6 Park Rehabilitation and Development (COMM)
$1,300,000 COMM_Key
Allegheny Ross Township Comp. Parks, Rec. & Open Space Plan
BRC-‐TAG-‐13.6-‐605
$25,000 $25,000 13.6 Comp. Rec., Park, & Open Space Plans (COMM)
$50,000 COMM_Key
Allegheny Ross Township Herge Park-Development
BRC-PRD-19-109
$155,000.00 $155,000.00 19 Park Rehabilitation and Development (COMM)
$310,000.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 38 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Allegheny Ross Township Herge Park-Development
BRC-PRD-19-109
$155,000.00 $155,000.00 19 Park Rehabilitation and Development (COMM)
$310,000.00 COMM_Key
Allegheny Ross Township Herge Park-Development
BRC-PRD-19-109
$155,000.00 $155,000.00 19 Park Rehabilitation and Development (COMM)
$310,000.00 COMM_Key
Allegheny Rosslyn Farms Borough
Borough Park BRC-‐PRD-‐14-‐169
$73,300 $73,300 14 Park Rehabilitation and Development (COMM)
$146,800 COMM_Key
Allegheny Rosslyn Farms Borough
Community Center BRC-‐SC-‐11-‐151
$37,200 $37,200 11 Small Communities/Small Projects (COMM)
$54,300 COMM_Key
Allegheny Rosslyn Farms Borough
Community Swimming Pool
BRC-‐PRD-‐7-‐168
$121,199 $120,000 7 Park Rehabilitation and Development (COMM)
$242,398 COMM_Key
Allegheny Scott Conservancy Carleton Manor Property
BRC-‐LTA-‐11-‐24
$19,000 $19,000 11 Open Space Acquisition (LT)
$38,000 LT_Key
Allegheny Scott Conservancy Dead Man's Hollow KEY-‐LTA-‐4-‐17
$70,000 $60,000 4 Open Space Acquisition (LT)
$140,200 LT_Key
Allegheny Scott Conservancy Kane Woods BRC-‐LTA-‐7-‐16
$474,250 $475,000 7 Critical Habitat Acquisition (LT)
$948,500 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 39 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Allegheny Scott Township Hope Street Acqusition
BRC-‐ACQ-‐13-‐226
$24,000 $24,000 13 Acquisition (COMM)
$48,000 COMM_Key
Allegheny Scott Township Meadowlark and Larsen Parks -‐ Development
BRC-‐PRD-‐17-‐150
$45,396 $45,400 17 Park Rehabilitation and Development (COMM)
$90,792 COMM_Key
Allegheny Scott Township Scott Park BRC-‐PRD-‐13-‐427
$55,500 $55,500 13 Park Rehabilitation and Development (COMM)
$111,000 COMM_Key
Allegheny Scott Township Scott Park & Scott Conservancy Master Site Plan
BRC-‐TAG-‐13-‐490
$50,000 $50,000 13 Master Site Plans (COMM)
$115,700 COMM_Key
Allegheny Sewickley Borough Riverfront Park KEY-‐PRD-‐5-‐180
$160,000 $150,000 5 Park Rehabilitation and Development (COMM)
$600,000 COMM_Key
Allegheny Sewickley Borough Sewickley Valley Rivers Conservation Plan
BRC-‐RCP-‐12-‐16
$125,000 $100,000 12 Planning (RIV) $250,000 COMM_Key
Allegheny Sewickley Borough Sewickley Valley Rivers Conservation Plan
BRC-‐RCP-‐12-‐16
$125,000 $25,000 12 Planning (RIV) $250,000 RIVER_Key
Keystone Fund Projects by County (1994-‐2013)
Page 40 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Allegheny Sewickley Hills Borough
Community Park BRC-‐PRD-‐10-‐136
$93,500 $70,000 10 Park Rehabilitation and Development (COMM)
$187,000 COMM_Key
Allegheny Shaler Township Fall Run Park KEY-‐PRD-‐4-‐136
$200,000 $75,000 4 Park Rehabilitation and Development (COMM)
$400,000 COMM_Key
Allegheny Shaler Township McElheny Road Park KEY-‐ACQ-‐1-‐124
$30,000 $30,000 1 Acquisition (COMM)
$161,200 COMM_Key
Allegheny Sharpsburg Borough 13th Street Boat Ramp/Riverside Park
BRC-‐PRD-‐13-‐141
$65,300 $65,300 13 Park Rehabilitation and Development (COMM)
$622,700 COMM_Key
Allegheny Sharpsburg Borough Improvements to 13th Street Boat Ramp Site-‐Phase II
BRC-‐RCD-‐16-‐179
$50,000 $50,000 16 Development (RIV)
$110,000 COMM_Key
Allegheny South Fayette Township
Community Center Feasibility Study
BRC-‐TAG-‐13-‐207
$25,000 $25,000 13 Feasibility Studies (COMM)
$50,000 COMM_Key
Allegheny South Fayette Township
Community Center-‐Development
BRC-‐PRD-‐16-‐160
$500,000 $200,000 16 Park Rehabilitation and Development (COMM)
$1,000,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 41 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Allegheny South Fayette Township
Fairview Park -‐ Phase I
KEY-‐PRD-‐4-‐143
$200,000 $100,000 4 Park Rehabilitation and Development (COMM)
$500,000 COMM_Key
Allegheny South Fayette Township
Fairview Park Athletic Fields
BRC-‐PRD-‐12-‐200
$500,000 $300,000 12 Park Rehabilitation and Development (COMM)
$1,000,000 COMM_Key
Allegheny South Fayette Township
Master Plan -‐ 4 Sites BRC-‐TAG-‐9-‐193
$27,500 $27,000 9 Master Site Plans (COMM)
$55,000 COMM_Key
Allegheny South Fayette Township
Morgan Park BRC-‐PRD-‐11-‐80
$65,000 $65,000 11 Park Rehabilitation and Development (COMM)
$130,000 COMM_Key
Allegheny South Fayette Township
Morgan Property Acquisition
BRC-‐ACQ-‐13.3-‐550
$67,500 $67,500 13.3 Acquisition (COMM)
$500,000 COMM_Key
Allegheny South Fayette Township
Municipal Park Master Site Plan
BRC-‐TAG-‐14-‐242
$17,000 $17,000 14 Master Site Plans (COMM)
$34,000 COMM_Key
Allegheny South Park Township Montour Trail - Library Viaduct to Pleasant Street Phase 8A4 - Development
BRC-PRD-19-117
$243,720.00 $243,000.00 19 Park Rehabilitation and Development (COMM)
$487,440.00 COMM_Key
Allegheny South Park Township Montour Trail - Library Viaduct to Pleasant Street Phase 8A4 - Development
BRC-PRD-19-117
$243,720.00 $243,000.00 19 Park Rehabilitation and Development (COMM)
$487,440.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 42 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Allegheny South Park Township Montour Trail - Library Viaduct to Pleasant Street Phase 8A4 - Development
BRC-PRD-19-117
$243,720.00 $243,000.00 19 Park Rehabilitation and Development (COMM)
$487,440.00 COMM_Key
Allegheny South Versailles Township
Coulter Playground -‐ Phase II
KEY-‐SC-‐5-‐188
$10,000 $10,000 5 Small Communities/Small Projects (COMM)
$10,000 COMM_Key
Allegheny South Versailles Township
Ninth Street Playground
KEY-‐SC-‐3-‐201
$14,800 $14,800 3 Small Communities/Small Projects (COMM)
$16,400 COMM_Key
Allegheny Sports and Exhibition Authority of Pittsburgh & Allegheny County
Convention Center Riverfront Park
BRC-‐PRD-‐12-‐202
$4,500,000 $500,000 12 Park Rehabilitation and Development (COMM)
$9,963,500 COMM_Key
Allegheny Sports and Exhibition Authority of Pittsburgh & Allegheny County
Convention Center Riverfront Park
BRC-‐PRD-‐8-‐182
$1,000,000 $500,000 8 Park Rehabilitation and Development (COMM)
$8,700,000 COMM_Key
Allegheny Sports and Exhibition Authority of Pittsburgh & Allegheny County
North Shore Riverfront Park-‐West Esplanade
BRC-‐PRD-‐8-‐183
$1,000,000 $500,000 8 Park Rehabilitation and Development (COMM)
$2,114,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 43 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Allegheny Steel Industry Heritage Corporation
Riverfront Heritage Trail
BRC-‐RTD-‐6-‐19
$100,000 $100,000 6 Rail Rehabilitation and Development (RT)
$200,000 RT_Key
Allegheny Steel Industry Heritage Corporation
Steel Valley Trail Phase II
BRC-‐RTD-‐7-‐16
$227,000 $200,000 7 Rail Rehabilitation and Development (RT)
$591,000 RT_Key
Allegheny Steel Industry Heritage Corporation
Steel Valley Trail Plan
KEY-‐RTP-‐95-‐26
$24,700 $24,700 1 Master Plans (RT)
$49,400 RT_Key
Allegheny Stowe Township Ohio River Trail -‐ Pittsburgh to Coraopolis Feasibility Study
BRC-‐RTP-‐16-‐183
$27,000 $27,000 16 Feasibility Studies (RT)
$54,000 COMM_Key
Allegheny Swissvale Borough Filmet Playground BRC-‐PRD-‐9-‐204
$50,000 $50,000 9 Park Rehabilitation and Development (COMM)
$100,000 COMM_Key
Allegheny Swissvale Borough Memorial Park BRC-‐PRD-‐13-‐147
$270,000 $100,000 13 Park Rehabilitation and Development (COMM)
$540,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 44 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Allegheny Swissvale Borough Memorial Park KEY-‐PRD-‐3-‐216
$37,000 $37,000 3 Park Rehabilitation and Development (COMM)
$74,000 COMM_Key
Allegheny Tarentum Borough Riverview Park Playground
BRC-‐SC-‐9-‐205
$38,200 $38,000 9 Small Communities/Small Projects (COMM)
$68,800 COMM_Key
Allegheny The Horticultural Society of Western Pennsylvania
Forest Biodiversity Enhancement
BRC-‐RCI-‐11-‐14
$26,400 $26,000 11 Implementation (RIV)
$52,900 RIVER_Key
Allegheny Turtle Creek Valley COG
Joint Recreation Feasibility Study
BRC-‐TAG-‐8-‐194
$10,000 $10,000 8 Feasibility Studies (COMM)
$20,000 COMM_Key
Allegheny Twin Rivers Council of Governments
Conduit Grant BRC-‐PRD-‐8-‐195
$85,000 $85,000 8 Park Rehabilitation and Development (COMM)
$85,000 COMM_Key
Allegheny Twin Rivers Council of Governments
Eleven Sites KEY-‐PRD-‐4-‐154
$170,330 $100,000 4 Park Rehabilitation and Development (COMM)
$615,287 COMM_Key
Allegheny Twin Rivers Council of Governments
Playground Renovations -‐ 18 sites
KEY-‐PRD-‐1-‐138
$122,235 $100,000 1 Park Rehabilitation and Development (COMM)
$244,471 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 45 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Allegheny Urban Redevelopment Authority of Pittsburgh
Armstrong Lofts Riverbank Stabilization
BRC-‐PRD-‐12-‐213
$150,000 $135,000 12 Park Rehabilitation and Development (COMM)
$650,000 COMM_Key
Allegheny Urban Redevelopment Authority of Pittsburgh
Hot Metal Bridge BRC-‐RTD-‐10-‐14
$931,000 $681,000 10 Rail Rehabilitation and Development (RT)
$1,862,000 COMM_Key
Allegheny Urban Redevelopment Authority of Pittsburgh
South Shore Riverfront Park
BRC-‐PRD-‐11.5-‐35
$350,000 $200,000 11.5 Park Rehabilitation and Development (COMM)
$700,000 COMM_Key
Allegheny Urban Redevelopment Authority of Pittsburgh
South Shore Riverfront Park
BRC-‐PRD-‐13-‐151
$1,000,000 $300,000 13 Park Rehabilitation and Development (COMM)
$4,200,000 COMM_Key
Allegheny Urban Redevelopment Authority of Pittsburgh
South Shore Riverfront Park
BRC-‐PRD-‐13.3-‐440
$500,000 $500,000 13.3 Park Rehabilitation and Development (COMM)
$4,199,900 COMM_Key
Allegheny Urban Redevelopment Authority of Pittsburgh
Tunnel Park -‐ Phase 2
BRC-‐PRD-‐11-‐95
$301,800 $200,000 11 Park Rehabilitation and Development (COMM)
$603,500 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 46 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Allegheny Versailles Borough First Street and High Street Playgrounds
BRC-‐SC-‐7-‐198
$20,000 $20,000 7 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Allegheny West Deer Township American Legion Land Acquisition -‐ (Curtisville Park)
BRC-‐ACQ-‐13.3-‐286
$36,500 $36,500 13.3 Acquisition (COMM)
$73,000 COMM_Key
Allegheny West Deer Township Bairdford Park/Nike Site Master Park Plan
BRC-‐TAG-‐17-‐27
$19,500 $19,500 17 Master Site Plans (COMM)
$39,000 COMM_Key
Allegheny West Deer Township Comprehensive Recreation, Park & Open Space Plan
BRC-‐TAG-‐9-‐227
$20,000 $20,000 9 Comp. Rec., Park, & Open Space Plans (COMM)
$40,000 COMM_Key
Allegheny West Deer Township Nike Park Development
BRC-PRD-19-124
$700,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)
$1,400,000.00 COMM_Key
Allegheny West Deer Township Nike Park Development
BRC-PRD-19-124
$700,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)
$1,400,000.00 COMM_Key
Allegheny West Deer Township Nike Park Development
BRC-PRD-19-124
$700,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)
$1,400,000.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 47 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Allegheny West Deer Township Two Sites KEY-‐PRD-‐5-‐221
$61,750 $60,000 5 Park Rehabilitation and Development (COMM)
$123,500 COMM_Key
Allegheny West Mifflin Borough
Lafarge Park 1-‐Development
BRC-‐PRD-‐16-‐166
$212,300 $154,000 16 Park Rehabilitation and Development (COMM)
$466,518 COMM_Key
Allegheny West View Borough Perry Highway and Glenmore Avenue Parkle
KEY-‐PRD-‐3-‐236
$120,000 $120,000 3 Park Rehabilitation and Development (COMM)
$240,000 COMM_Key
Allegheny Western Pennsylvania Coalition for Abandoned Mine Reclamation.
Bull Creek KEY-‐CHP-‐2-‐9
$5,000 $5,000 5 Coldwater Heritage Partnership
$5,000 RIVER_Key
Allegheny Western Pennsylvania Conservancy
Connoquenessing Creek Watershed Conservation Plan
BRC-‐RCP-‐11-‐16
$160,500 $115,000 11 Planning (RIV) $327,500 RIVER_Key
Allegheny White Oak Borough Larry Bishop Park BRC-‐PRD-‐11-‐100
$63,000 $63,000 11 Park Rehabilitation and Development (COMM)
$126,200 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 48 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Allegheny Wilkinsburg Borough Comp. Recreation, Park & Open Space Plan
KEY-‐TAG-‐5-‐227
$25,000 $25,000 5 Comp. Rec., Park, & Open Space Plans (COMM)
$50,000 COMM_Key
Allegheny Zoological Society of Pittsburgh
African Wild Dog Exhibit
BRC-‐PRD-‐12-‐221
$80,000 $80,000 12 Park Rehabilitation and Development (COMM)
$166,000 COMM_Key
Allegheny Zoological Society of Pittsburgh
Children's Zoo KEY-‐ZOO-‐94-‐6
$1,000,000 $1,000,000 1 Zoo $2,000,000 COMM_Key
Allegheny, Beaver, Washington
Washington County Conservation District
Raccoon Creek Watershed Conservation Plan
BRC-‐RCP-‐17-‐163
$89,778 $89,800 17 Planning (RIV) $205,276 RIVER_Key
Allegheny, Westmoreland
Westmoreland County Turtle Creek Railroad Corridor - Acquisition
BRC-RTA-19-161
$457,000.00 $457,000.00 19 Acquisition (RT)
$914,000.00 COMM_Key
Allegheny, Westmoreland
Westmoreland County Turtle Creek Railroad Corridor - Acquisition
BRC-RTA-19-161
$457,000.00 $457,000.00 19 Acquisition (RT)
$914,000.00 COMM_Key
Allegheny, Westmoreland
Westmoreland County Turtle Creek Railroad Corridor - Acquisition
BRC-RTA-19-161
$457,000.00 $457,000.00 19 Acquisition (RT)
$914,000.00 COMM_Key
Allegheny, Westmoreland
Westmoreland County Turtle Creek Railroad Corridor - Acquisition
BRC-RTA-19-161
$457,000.00 $457,000.00 19 Acquisition (RT)
$914,000.00 COMM_Key
Allegheny, Westmoreland
Westmoreland County Turtle Creek Railroad Corridor - Acquisition
BRC-RTA-19-161
$457,000.00 $457,000.00 19 Acquisition (RT)
$914,000.00 COMM_Key
Allegheny, Westmoreland
Westmoreland County Turtle Creek Railroad Corridor - Acquisition
BRC-RTA-19-161
$457,000.00 $457,000.00 19 Acquisition (RT)
$914,000.00 COMM_Key
Allegheny, Westmoreland
Westmoreland County Turtle Creek Railroad Corridor - Acquisition
BRC-RTA-19-161
$457,000.00 $457,000.00 19 Acquisition (RT)
$914,000.00 COMM_Key
Allegheny, Westmoreland
Westmoreland County Turtle Creek Railroad Corridor - Acquisition
BRC-RTA-19-161
$457,000.00 $457,000.00 19 Acquisition (RT)
$914,000.00 COMM_Key
Armstrong Allegheny Valley Land Trust
Armstrong Rail-‐Trail BRC-‐RTP-‐8-‐2
$28,800 $28,000 8 Master Plans (RT)
$57,600 RT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 49 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Armstrong Allegheny Valley Land Trust
Armstrong Trail -‐ Mahoning North Development
BRC-‐RTD-‐12-‐4
$50,100 $50,100 12 Rail Rehabilitation and Development (RT)
$100,200 RT_Key
Armstrong Allegheny Valley Land Trust
Armstrong Trail-‐Scheeren/Templeton Sections
KEY-‐RTD-‐4-‐2
$25,750 $25,750 4 Rail Rehabilitation and Development (RT)
$51,500 RT_Key
Armstrong Apollo Borough Apollo Borough Park BRC-‐SC-‐7-‐10
$25,000 $25,000 7 Small Communities/Small Projects (COMM)
$30,000 COMM_Key
Armstrong Applewold Borough Walking/Jogging Track & Shelter
BRC-‐SC-‐7-‐11
$20,000 $20,000 7 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Armstrong Armstrong County Armstrong County OHV Park Acquisition
BRC-‐S/ATV-‐17-‐62
$824,990 $234,400 17 Snowmobile/ATV_Acquisition
$1,649,980 COMM_Key
Armstrong Armstrong County Belmont Complex BRC-‐PRD-‐14-‐111
$350,000 $350,000 14 Park Rehabilitation and Development (COMM)
$700,000 COMM_Key
Armstrong Armstrong County Belmont Complex BRC-‐PRD-‐7-‐13
$28,730 $28,000 7 Park Rehabilitation and Development (COMM)
$57,460 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 50 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Armstrong Armstrong County Belmont Complex KEY-‐PRD-‐1-‐4
$150,000 $100,000 1 Park Rehabilitation and Development (COMM)
$302,700 COMM_Key
Armstrong Armstrong County Belmont Complex Feasibility Study
BRC-‐TAG-‐11-‐191
$24,700 $24,700 11 Feasibility Studies (COMM)
$49,400 COMM_Key
Armstrong Armstrong County Buttermilk Falls Trail BRC-‐PRD-‐10-‐109
$140,343 $100,000 10 Park Rehabilitation and Development (COMM)
$1,471,683 COMM_Key
Armstrong Armstrong County Peer-‐to-‐Peer KEY-‐TAG-‐5-‐1
$6,300 $6,300 5 Peer-‐to-‐Peer Tech. Assistance (COMM)
$7,000 COMM_Key
Armstrong Armstrong County Recreation, Park, Open Space and Greenway Plan
BRC-‐TAG-‐12-‐222
$70,000 $50,000 12 Comp. Rec., Park, & Open Space Plans (COMM)
$140,000 COMM_Key
Armstrong Armstrong County Conservancy Charitable Trust
Heasley Properties KEY-‐RTA-‐4-‐4
$20,000 $20,000 4 Acquisition (RT) $40,000 RT_Key
Armstrong Armstrong County Conservancy Charitable Trust
Minteer Limestone Spring Acquisition
BRC-‐LTA-‐8-‐2
$33,000 $30,000 8 Critical Habitat Acquisition (LT)
$66,000 LT_Key
Armstrong Cadogan Township Community Park KEY-‐SC-‐1-‐26 $20,000 $20,000 1 Small Communities/Small Projects (COMM)
$20,750 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 51 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Armstrong Cowanshannock Creek Watershed Association
Cowanshannock Creek Watershed Plan
BRC-‐RCP-‐6-‐20
$30,000 $30,000 6 Planning (RIV) $60,000 RIVER_Key
Armstrong Cowanshannock Township
Sagamore Playground
KEY-‐SC-‐3-‐42 $20,000 $20,000 3 Small Communities/Small Projects (COMM)
$23,000 COMM_Key
Armstrong Dayton Borough Community Park BRC-‐SC-‐9-‐60
$23,800 $23,000 9 Small Communities/Small Projects (COMM)
$27,200 COMM_Key
Armstrong East Franklin Township
Armstrong Heritage Park
KEY-‐PRD-‐5-‐56
$40,000 $40,000 5 Park Rehabilitation and Development (COMM)
$80,000 COMM_Key
Armstrong East Franklin Township
West Hills Community Park -‐ Development
BRC-‐PRD-‐17-‐115
$25,113 $25,100 17 Park Rehabilitation and Development (COMM)
$50,798 COMM_Key
Armstrong Elderton Borough Elderton/Plumcreek Park
BRC-‐SC-‐10-‐76
$33,000 $30,000 10 Small Communities/Small Projects (COMM)
$46,000 COMM_Key
Armstrong Ford City Borough Armstrong Trail BRC-‐RTD-‐7-‐5
$40,000 $40,000 7 Rail Rehabilitation and Development (RT)
$80,000 RT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 52 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Armstrong Ford City Borough Armstrong Trail 14th St to McCain Street -‐ Development
BRC-‐PRD-‐18-‐71
$34,195 $34,200 18 Park Rehabilitation and Development (COMM)
$73,455 COMM_Key
Armstrong Ford City Borough Joe Malec Memorial Park
BRC-‐SC-‐6-‐65
$20,000 $20,000 6 Small Communities/Small Projects (COMM)
$20,500 COMM_Key
Armstrong Ford City Borough Riverfront Park Development
BRC-‐PRD-‐11-‐35
$223,400 $150,000 11 Park Rehabilitation and Development (COMM)
$446,800 COMM_Key
Armstrong Ford City Borough Riverside Master Plan
BRC-‐TAG-‐9-‐77
$15,000 $15,000 9 Master Site Plans (COMM)
$30,000 COMM_Key
Armstrong Freeport Borough Borough Park BRC-‐SC-‐6-‐72
$20,000 $20,000 6 Small Communities/Small Projects (COMM)
$26,275 COMM_Key
Armstrong Freeport Borough Butler to Freeport Trail Extension Project
BRC-‐RTD-‐9-‐5
$324,000 $140,000 9 Rail Rehabilitation and Development (RT)
$648,000 RT_Key
Armstrong Freeport Borough Freeport Riverside Park
KEY-‐SC-‐3-‐72 $20,000 $20,000 3 Small Communities/Small Projects (COMM)
$22,500 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 53 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Armstrong Freeport Borough Freeport Trail -‐ Hurricane Damage
BRC-‐RTD-‐11-‐5
$65,000 $65,000 11 Rail Rehabilitation and Development (RT)
$130,000 COMM_Key
Armstrong Freeport Borough Peer-‐ to-‐ Peer KEY-‐TAG-‐5-‐2
$7,500 $7,500 5 Peer-‐to-‐Peer Tech. Assistance (COMM)
$8,250 COMM_Key
Armstrong Gilpin Township Gilpin-‐Leechburg Park
BRC-‐SC-‐8-‐76
$28,000 $28,000 8 Small Communities/Small Projects (COMM)
$42,500 COMM_Key
Armstrong Kittanning Borough Armstrong Trail -‐ North of Chestnut Street -‐ Development
BRC-‐PRD-‐18-‐174
$55,652 $55,600 18 Park Rehabilitation and Development (COMM)
$122,999 COMM_Key
Armstrong Kittanning Borough Armstrong Trail Enhancement/Safe Route to School
BRC-‐PRD-‐12-‐162
$16,000 $16,000 12 Park Rehabilitation and Development (COMM)
$232,000 COMM_Key
Armstrong Kittanning Borough Armstrong Trail-Development
BRC-SC-19-43
$36,082.00 $36,000.00 19 Small Communities/Small Projects (COMM)
$59,882.00 COMM_Key
Armstrong Kittanning Borough Armstrong Trail-Development
BRC-SC-19-43
$36,082.00 $36,000.00 19 Small Communities/Small Projects (COMM)
$59,882.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 54 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Armstrong Kittanning Borough Armstrong Trail-Development
BRC-SC-19-43
$36,082.00 $36,000.00 19 Small Communities/Small Projects (COMM)
$59,882.00 COMM_Key
Armstrong Kittanning Borough Community Park BRC-‐SC-‐8-‐100
$40,000 $40,000 8 Small Communities/Small Projects (COMM)
$99,500 COMM_Key
Armstrong Kittanning Borough John Whelan Memorial Playground
BRC-‐PRD-‐9-‐109
$40,000 $40,000 9 Park Rehabilitation and Development (COMM)
$112,600 COMM_Key
Armstrong Kittanning Borough Kittanning Trail BRC-‐RTD-‐6-‐14
$40,000 $190,000 6 Rail Rehabilitation and Development (RT)
$730,000 RT_Key
Armstrong Kittanning Township Community Park BRC-‐SC-‐13-‐308
$29,200 $20,000 13 Small Communities/Small Projects (COMM)
$36,300 COMM_Key
Armstrong Kittanning Township Community Park BRC-‐SC-‐6-‐89
$20,000 $20,000 6 Small Communities/Small Projects (COMM)
$21,000 COMM_Key
Armstrong Kittanning Township Community Park KEY-‐SC-‐4-‐75 $20,000 $20,000 4 Small Communities/Small Projects (COMM)
$21,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 55 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Armstrong Kittanning Township Kittanning Township Community Park
BRC-‐SC-‐7-‐95
$33,500 $33,000 7 Small Communities/Small Projects (COMM)
$46,935 COMM_Key
Armstrong Leechburg Borough Campbell Avenue Playground
BRC-‐SC-‐12-‐104
$25,000 $26,000 12 Small Communities/Small Projects (COMM)
$31,000 COMM_Key
Armstrong Leechburg Borough Riverfront Park KEY-‐SC-‐3-‐113
$20,000 $20,000 3 Small Communities/Small Projects (COMM)
$22,500 COMM_Key
Armstrong Madison Township Community Park KEY-‐SC-‐2-‐90 $20,000 $20,000 2 Small Communities/Small Projects (COMM)
$22,000 COMM_Key
Armstrong Parker City Phillips Municipal Park
BRC-‐SC-‐6-‐136
$20,000 $20,000 6 Small Communities/Small Projects (COMM)
$23,000 COMM_Key
Armstrong Parker City Phillips Municipal Park
BRC-‐SC-‐7-‐146
$36,000 $36,000 7 Small Communities/Small Projects (COMM)
$56,000 COMM_Key
Armstrong Parker City River Avenue Boat Launch Area
BRC-‐PRD-‐14-‐161
$12,700 $22,700 14 Park Rehabilitation and Development (COMM)
$50,600 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 56 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Armstrong Parks Township Kiskimere and Knepple Hill Parks
BRC-‐SC-‐11-‐145
$40,000 $40,000 11 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Armstrong Parks Township North Vandergrift Park
BRC-‐SC-‐7-‐148
$20,000 $20,000 7 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Armstrong Pine Township Templeton Community Park-‐ Development
BRC-‐SC-‐18-‐37
$31,878 $31,800 18 Small Communities/Small Projects (COMM)
$51,216 COMM_Key
Armstrong Redbank Township Master Site Plan BRC-‐TAG-‐10-‐167
$6,500 $6,500 10 Master Site Plans (COMM)
$13,000 COMM_Key
Armstrong Roaring Run Watershed Association
Kiski Realty Company Property Acquisition
BRC-‐RTA-‐8-‐14
$65,700 $65,000 8 Acquisition (RT) $155,400 RT_Key
Armstrong Roaring Run Watershed Association
Kiski Realty Property KEY-‐LTA-‐1-‐11
$62,500 $50,000 1 Open Space Acquisition (LT)
$125,000 LT_Key
Armstrong Roaring Run Watershed Association
Roaring Run Trail -‐ Phase 3
KEY-‐RTD-‐3-‐19
$8,900 $8,900 3 Rail Rehabilitation and Development (RT)
$17,800 RT_Key
Armstrong Roaring Run Watershed Association
Roaring Run Trail -‐ Phase 4
BRC-‐RTD-‐12-‐13
$84,000 $84,000 12 Rail Rehabilitation and Development (RT)
$474,600 RT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 57 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Armstrong Rural Valley Borough Shannock Valley Community Park
BRC-‐SC-‐14-‐104
$30,500 $30,500 14 Small Communities/Small Projects (COMM)
$41,275 COMM_Key
Armstrong Rural Valley Borough Shannock Valley Community Park
BRC-‐SC-‐8-‐163
$27,000 $27,000 8 Small Communities/Small Projects (COMM)
$34,000 COMM_Key
Armstrong Washington Township
Memorial Park -‐ Development
BRC-‐SC-‐17-‐49
$26,396 $26,400 17 Small Communities/Small Projects (COMM)
$32,793 COMM_Key
Armstrong West Kittanning Borough
West Kittanning Park BRC-‐SC-‐14-‐108
$34,300 $34,300 14 Small Communities/Small Projects (COMM)
$49,900 COMM_Key
Armstrong Worthington Borough
Worthington Borough Playground
BRC-‐SC-‐7-‐214
$24,000 $24,000 7 Small Communities/Small Projects (COMM)
$28,017 COMM_Key
Armstrong, Butler
Audubon Society of Western Pennsylvania
Buffalo Creek Watershed Conservation Plan
BRC-‐RCP-‐11-‐1
$60,000 $50,000 11 Planning (RIV) $120,000 RIVER_Key
Armstrong, Cambria, Indiana, Somerset, Westmoreland
Allegheny Ridge Corporation
Kiski-‐Conemaugh Basin Water Trail Mapping
BRC-‐RCI-‐13.3-‐505
$20,000 $20,000 13.3 Implementation (RIV)
$59,200 RIVER_Key
Keystone Fund Projects by County (1994-‐2013)
Page 58 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Beaver Aliquippa City Comp. Recreation, Park & Open Space Plan
KEY-‐TAG-‐4-‐8
$10,000 $10,000 4 Comp. Rec., Park, & Open Space Plans (COMM)
$20,000 COMM_Key
Beaver Aliquippa City Ravine Park BRC-‐PRD-‐13-‐330
$30,000 $30,000 13 Park Rehabilitation and Development (COMM)
$60,000 COMM_Key
Beaver Aliquippa City Recreation Upgrades -‐ Master Site Plans
BRC-‐TAG-‐10-‐145
$36,300 $36,000 10 Master Site Plans (COMM)
$72,500 COMM_Key
Beaver Aliquippa City Trail Feasibility Study BRC-‐TAG-‐14-‐189
$20,000 $20,000 14 Feasibility Studies (COMM)
$40,000 COMM_Key
Beaver Ambridge Borough Walter Panek Park Planning Study
BRC-‐TAG-‐13-‐177
$17,500 $17,500 13 Master Site Plans (COMM)
$35,000 COMM_Key
Beaver Ambridge Borough Walter Panek Park-‐ Development
BRC-‐PRD-‐18-‐46
$30,400 $30,400 18 Park Rehabilitation and Development (COMM)
$60,800 COMM_Key
Beaver Beaver Borough Indoor Recreation Center Feasibility Study
BRC-‐TAG-‐13.3-‐457
$31,500 $31,500 13.3 Feasibility Studies (COMM)
$63,000 COMM_Key
Beaver Beaver County Brady's Run County Park
BRC-‐PRD-‐9-‐15
$80,000 $80,000 9 Park Rehabilitation and Development (COMM)
$160,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 59 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Beaver Beaver County Bradys Run Park -‐ Development
BRC-‐PRD-‐17-‐103
$250,000 $250,000 17 Park Rehabilitation and Development (COMM)
$500,000 COMM_Key
Beaver Beaver County Bradys Run Park-‐ Development
BRC-‐PRD-‐18-‐47
$180,000 $180,000 18 Park Rehabilitation and Development (COMM)
$360,000 COMM_Key
Beaver Beaver County Buttermilk Falls KEY-‐PRD-‐3-‐12
$50,000 $50,000 3 Park Rehabilitation and Development (COMM)
$100,000 COMM_Key
Beaver Beaver County Comp. Park, Recreation and Open Space Plan
BRC-‐TAG-‐6-‐17
$32,500 $32,500 6 Comp. Rec., Park, & Open Space Plans (COMM)
$65,000 COMM_Key
Beaver Beaver County Greenways & Trails Plan
BRC-‐TAG-‐9-‐16
$25,000 $25,000 9 Greenway Plans (COMM)
$50,000 COMM_Key
Beaver Beaver County Master Site Development Plan
KEY-‐TAG-‐3-‐13
$20,000 $20,000 3 Master Site Plans (COMM)
$40,000 COMM_Key
Beaver Beaver County Master Site Plans-‐Three Parks
BRC-‐TAG-‐10-‐146
$75,000 $75,000 10 Master Site Plans (COMM)
$150,000 COMM_Key
Beaver Beaver Falls City Pool Feasibility Study BRC-‐TAG-‐12-‐223
$10,000 $10,000 12 Feasibility Studies (COMM)
$20,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 60 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Beaver Beaver Valley Council of Governments
Peer-‐to-‐Peer KEY-‐TAG-‐3-‐1
$7,500 $7,500 3 Peer-‐to-‐Peer Tech. Assistance (COMM)
$8,250 COMM_Key
Beaver Big Beaver Borough Big Beaver Borough Municipal Park
BRC-‐TAG-‐7-‐20
$10,000 $10,000 7 Master Site Plans (COMM)
$20,000 COMM_Key
Beaver Bridgewater Borough
Bicentennial Park KEY-‐PRD-‐2-‐18
$100,000 $100,000 2 Park Rehabilitation and Development (COMM)
$200,000 COMM_Key
Beaver Bridgewater Borough
Bridgewater Trail North
BRC-‐PRD-‐13-‐92
$350,000 $200,000 13 Park Rehabilitation and Development (COMM)
$1,046,700 COMM_Key
Beaver Brighton Township CAMBEV Property Master Site Plan
BRC-‐TAG-‐10-‐147
$10,000 $10,000 10 Master Site Plans (COMM)
$20,000 COMM_Key
Beaver Brighton Township Commuter Bicycle Lanes
BRC-‐PRD-‐12-‐273
$100,000 $100,000 12 Park Rehabilitation and Development (COMM)
$390,400 COMM_Key
Beaver Brighton Township Dawson Ridge Park KEY-‐PRD-‐3-‐22
$15,000 $15,000 3 Park Rehabilitation and Development (COMM)
$34,700 COMM_Key
Beaver Brighton Township Feasibility Study BRC-‐TAG-‐6-‐23
$20,000 $20,000 6 Feasibility Studies (COMM)
$40,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 61 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Beaver Brighton Township Greenways and Trails Network Plan
BRC-TAG-19-128
$16,225.00 $16,200.00 19 Greenway Plans (COMM)
$32,450.00 COMM_Key
Beaver Brighton Township Greenways and Trails Network Plan
BRC-TAG-19-128
$16,225.00 $16,200.00 19 Greenway Plans (COMM)
$32,450.00 COMM_Key
Beaver Brighton Township Greenways and Trails Network Plan
BRC-TAG-19-128
$16,225.00 $16,200.00 19 Greenway Plans (COMM)
$32,450.00 COMM_Key
Beaver Brighton Township Hardy Field -‐ Development
BRC-‐PRD-‐17-‐108
$100,000 $100,000 17 Park Rehabilitation and Development (COMM)
$205,668 COMM_Key
Beaver Brighton Township Novakovic Property KEY-‐ACQ-‐5-‐23
$30,150 $30,000 5 Acquisition (COMM)
$60,309 COMM_Key
Beaver Brighton Township Rural Pedestrian Trail
BRC-‐PRD-‐7-‐25
$29,450 $29,000 7 Park Rehabilitation and Development (COMM)
$58,981 COMM_Key
Beaver Brighton Township Two Mile Run Park BRC-‐PRD-‐11-‐10
$78,000 $78,000 11 Park Rehabilitation and Development (COMM)
$156,000 COMM_Key
Beaver Brighton Township Yurfick Property Acquisition
BRC-‐ACQ-‐13.6-‐578
$33,600 $33,600 13.6 Acquisition (COMM)
$67,200 COMM_Key
Beaver Center Township Safe Routes to School
BRC-‐TAG-‐11-‐196
$15,000 $15,000 11 Trail Study (COMM)
$30,000 COMM_Key
Beaver Chippewa Township Blackhawk Soccer Fields
KEY-‐PRD-‐5-‐34
$90,813 $70,000 5 Park Rehabilitation and Development (COMM)
$181,625 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 62 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Beaver Chippewa Township Comprehensive Regional Rec. & Park Plan
BRC-‐TAG-‐9-‐48
$25,000 $25,000 9 Comp. Rec., Park, & Open Space Plans (COMM)
$50,000 COMM_Key
Beaver Chippewa Township Labate Property Acquisition
BRC-‐ACQ-‐13.3-‐274
$350,000 $350,000 13.3 Acquisition (COMM)
$1,400,000 COMM_Key
Beaver Chippewa Township McKinley Park -‐ Phase I-‐Development
BRC-‐PRD-‐15-‐54
$231,468 $125,900 15 Park Rehabilitation and Development (COMM)
$462,936 COMM_Key
Beaver Conway Borough Buttermore Park KEY-‐SC-‐5-‐38 $20,000 $20,000 5 Small Communities/Small Projects (COMM)
$21,700 COMM_Key
Beaver Conway Borough Gratty Park Playground
BRC-‐PRD-‐9-‐57
$54,000 $54,000 9 Park Rehabilitation and Development (COMM)
$108,000 COMM_Key
Beaver Darlington Township Township Muncipal Park
BRC-‐TAG-‐7-‐48
$12,750 $12,500 7 Master Site Plans (COMM)
$25,500 COMM_Key
Beaver East Rochester Borough
Fifth Street Playground
KEY-‐SC-‐4-‐50 $20,000 $20,000 4 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Beaver Economy Borough Economy Borough Master Plans
BRC-‐TAG-‐7-‐63
$35,000 $15,000 7 Master Site Plans (COMM)
$70,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 63 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Beaver Economy Borough Recreation Park Phase I -‐ Playground
BRC-‐PRD-‐9-‐71
$49,800 $49,000 9 Park Rehabilitation and Development (COMM)
$165,900 COMM_Key
Beaver Franklin Township Franklin Park BRC-‐PRD-‐8-‐72
$66,000 $66,000 8 Park Rehabilitation and Development (COMM)
$241,700 COMM_Key
Beaver Franklin Township Franklin Park BRC-‐PRD-‐9-‐80
$80,000 $80,000 9 Park Rehabilitation and Development (COMM)
$173,000 COMM_Key
Beaver Greene Township Mateer Property BRC-‐ACQ-‐6-‐76
$50,000 $50,000 6 Acquisition (COMM)
$101,970 COMM_Key
Beaver Greene Township Reg. Comp. Recreation Plan
BRC-‐TAG-‐8-‐78
$20,000 $20,000 8 Comp. Rec., Park, & Open Space Plans (COMM)
$40,000 COMM_Key
Beaver Hopewell Township Hopewell Community Park-‐Development
BRC-‐PRD-‐18-‐73
$87,925 $87,000 18 Park Rehabilitation and Development (COMM)
$175,850 COMM_Key
Beaver Hopewell Township Hopewell Township Park
BRC-‐TAG-‐7-‐85
$10,000 $10,000 7 Master Site Plans (COMM)
$20,000 COMM_Key
Beaver Hopewell Township Nemtz/ Agresti Land Acquisition
BRC-‐ACQ-‐13-‐227
$72,500 $71,000 13 Acquisition (COMM)
$145,100 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 64 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Beaver Hopewell Township Youth Baseball Complex
BRC-‐PRD-‐13-‐109
$100,000 $100,000 13 Park Rehabilitation and Development (COMM)
$200,000 COMM_Key
Beaver Independence Township
Community Park -‐ Phase I
BRC-‐PRD-‐10-‐120
$95,300 $50,000 10 Park Rehabilitation and Development (COMM)
$170,600 COMM_Key
Beaver Independence Township
Municipal Park Master Plan
BRC-‐TAG-‐7-‐90
$11,000 $11,000 7 Master Site Plans (COMM)
$22,000 COMM_Key
Beaver Industry Borough Community Park BRC-‐SC-‐8-‐90
$20,000 $20,000 8 Small Communities/Small Projects (COMM)
$21,000 COMM_Key
Beaver Industry Borough Community Park KEY-‐SC-‐3-‐96 $20,000 $20,000 3 Small Communities/Small Projects (COMM)
$32,000 COMM_Key
Beaver Midland Borough Midland Recreation Complex
BRC-‐PRD-‐11-‐56
$97,800 $97,800 11 Park Rehabilitation and Development (COMM)
$195,600 COMM_Key
Beaver Midland Borough Ohio River Trail -‐ North Shore Trail Feasibility Study
BRC-‐TAG-‐16-‐64
$29,000 $29,000 16 Trail Study (COMM)
$58,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 65 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Beaver Monaca Borough 15th Street Playground
BRC-‐PRD-‐6-‐115
$25,575 $25,000 6 Park Rehabilitation and Development (COMM)
$51,150 COMM_Key
Beaver Monaca Borough John A. Antoline Park- Phase-1-Development
BRC-PRD-19-98
$150,000.00 $150,000.00 19 Park Rehabilitation and Development (COMM)
$300,000.00 COMM_Key
Beaver Monaca Borough John A. Antoline Park- Phase-1-Development
BRC-PRD-19-98
$150,000.00 $150,000.00 19 Park Rehabilitation and Development (COMM)
$300,000.00 COMM_Key
Beaver Monaca Borough John A. Antoline Park- Phase-1-Development
BRC-PRD-19-98
$150,000.00 $150,000.00 19 Park Rehabilitation and Development (COMM)
$300,000.00 COMM_Key
Beaver Monaca Borough Riverfront Park BRC-‐PRD-‐13-‐126
$345,000 $200,000 13 Park Rehabilitation and Development (COMM)
$691,200 COMM_Key
Beaver Monaca Borough Riverfront Park KEY-‐PRD-‐1-‐86
$150,000 $100,000 1 Park Rehabilitation and Development (COMM)
$300,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 66 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Beaver New Brighton Area Recreation Commission
New Brighton Memorial Field-‐Development
BRC-‐PRD-‐15-‐62
$120,000 $166,100 15 Park Rehabilitation and Development (COMM)
$245,000 COMM_Key
Beaver New Brighton Borough
Riverfront Park KEY-‐ACQ-‐5-‐143
$15,000 $15,000 5 Acquisition (COMM)
$30,000 COMM_Key
Beaver New Galilee Borough
New Galilee Borough Park
BRC-‐SC-‐8-‐129
$20,000 $23,000 8 Small Communities/Small Projects (COMM)
$26,200 COMM_Key
Beaver New Sewickley Township
Green Valley Park BRC-‐PRD-‐11-‐60
$17,300 $17,300 11 Park Rehabilitation and Development (COMM)
$34,600 COMM_Key
Beaver North Sewickley Township
Bradshaw Park BRC-‐PRD-‐8-‐137
$96,000 $96,000 8 Park Rehabilitation and Development (COMM)
$537,400 COMM_Key
Beaver Patterson Heights Borough
Patterson Heights Park
BRC-‐SC-‐14-‐98
$21,300 $21,300 14 Small Communities/Small Projects (COMM)
$22,300 COMM_Key
Beaver Patterson Heights Borough
Patterson Heights Park
KEY-‐SC-‐5-‐155
$20,000 $20,000 5 Small Communities/Small Projects (COMM)
$42,000 COMM_Key
Beaver Raccoon Township Raccoon Township Municipal Park
BRC-‐TAG-‐7-‐161
$10,000 $10,000 7 Master Site Plans (COMM)
$20,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 67 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Beaver Raccoon Township Township Park KEY-‐SC-‐4-‐131
$20,000 $20,000 4 Small Communities/Small Projects (COMM)
$24,543 COMM_Key
Beaver Rochester Borough Rochester riverfront park Master Plan
KEY-‐TAG-‐5-‐173
$25,000 $25,000 5 Master Site Plans (COMM)
$50,000 COMM_Key
Beaver Rochester Township Gallo Park BRC-‐SC-‐14-‐103
$40,000 $40,000 14 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Beaver South Beaver Township
Township Park BRC-‐SC-‐14-‐105
$28,400 $28,400 14 Small Communities/Small Projects (COMM)
$36,900 COMM_Key
Beaver South Beaver Township
Township Park BRC-‐SC-‐6-‐169
$20,000 $20,000 6 Small Communities/Small Projects (COMM)
$24,063 COMM_Key
Beaver South Heights Borough
South Heights Municipal Park
BRC-‐SC-‐8-‐180
$20,000 $20,000 8 Small Communities/Small Projects (COMM)
$22,100 COMM_Key
Beaver Vanport Township Jefferson Avenue Playground
KEY-‐SC-‐5-‐208
$20,000 $20,000 5 Small Communities/Small Projects (COMM)
$32,226 COMM_Key
Beaver White Township Community Park-‐ Phase 1-‐Development
BRC-‐SC-‐16-‐50
$40,000 $40,000 16 Small Communities/Small Projects (COMM)
$52,878 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 68 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Beaver, Lawrence
Pennsylvania Environmental Council, Inc.
Beaver River Conservation Plan
BRC-‐RCP-‐10-‐6
$99,000 $95,000 10 Planning (RIV) $198,000 RIVER_Key
Bedford Bedford County Natural Heritage Inventory
KEY-‐TAG-‐1-‐9
$29,200 $25,000 1 Natural Areas Inventories (COMM)
$58,400 COMM_Key
Bedford Bedford County Peer-‐to-‐Peer Study BRC-‐TAG-‐16-‐11
$10,000 $10,000 16 Peer-‐to-‐Peer Tech. Assistance (COMM)
$15,000 COMM_Key
Bedford Bedford County Conservation District
Lake Koon Development
BRC-‐PRD-‐15-‐50
$46,500 $46,500 15 Park Rehabilitation and Development (COMM)
$98,000 COMM_Key
Bedford Bedford Joint Municipal Authority
Bedford Heritage Trail -‐ Development
BRC-‐PRD-‐18-‐48
$573,629 $453,100 18 Park Rehabilitation and Development (COMM)
$1,147,258 COMM_Key
Bedford Bedford Joint Municipal Authority
Bedford Heritage Trail Feasibility Study
BRC-‐TAG-‐17-‐3
$20,625 $20,600 17 Trail Study (COMM)
$41,250 COMM_Key
Bedford Broad Top Township Broad Top Township Rail Trail Acquisition
BRC-‐RTA-‐14-‐277
$88,800 $78,300 14 Acquisition (RT) $177,600 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 69 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Bedford Broad Top Township Huntingdon & Broad Top Rail Trail -‐ Phase 2 -‐ Development
BRC-‐RTD-‐18-‐169
$54,804 $54,800 18 Rail Rehabilitation and Development (RT)
$109,608 COMM_Key
Bedford Broad Top Township Huntingdon & Broad Top Rail Trail - Phase 2b - Development
$86,406.00 $80,000.00 19 Rail Rehabilitation and Development (RT)
$172,812.00 COMM_Key
Bedford Broad Top Township Huntingdon & Broad Top Rail Trail - Phase 2b - Development
$86,406.00 $80,000.00 19 Rail Rehabilitation and Development (RT)
$172,812.00 COMM_Key
Bedford Broad Top Township Huntingdon & Broad Top Rail Trail - Phase 2b - Development
$86,406.00 $80,000.00 19 Rail Rehabilitation and Development (RT)
$172,812.00 COMM_Key
Bedford Broad Top Township Huntington & Broad Top Rail Trail -‐ Phase I Construction
BRC-‐RTP-‐16-‐181
$23,000 $23,000 16 Master Plans (RT)
$46,000 COMM_Key
Bedford Broad Top Township Riddlesburg Community Park
BRC-‐SC-‐9-‐34
$30,200 $30,000 9 Small Communities/Small Projects (COMM)
$40,500 COMM_Key
Bedford Broad Top Township Steele Property Acquisition -‐ (Rail Trail)
BRC-‐RTA-‐13-‐12
$30,500 $30,000 13 Acquisition (RT) $61,000 RT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 70 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Bedford Cumberland Valley Township
Centerville Recreational Park
BRC-‐PRD-‐13-‐100
$79,900 $75,000 13 Park Rehabilitation and Development (COMM)
$159,800 COMM_Key
Bedford Everett Borough Tenley Park -‐ Development
BRC-‐SC-‐17-‐35
$30,000 $30,000 17 Small Communities/Small Projects (COMM)
$58,579 COMM_Key
Bedford Hopewell Borough Community Park-‐Development
BRC-‐SC-‐15-‐80
$30,168 $30,000 15 Small Communities/Small Projects (COMM)
$40,337 COMM_Key
Bedford Hyndman Borough Hyndman Park BRC-‐SC-‐7-‐89
$29,198 $29,000 7 Small Communities/Small Projects (COMM)
$42,475 COMM_Key
Bedford Hyndman Borough Hyndman Park KEY-‐SC-‐5-‐93 $19,234 $19,200 5 Small Communities/Small Projects (COMM)
$38,468 COMM_Key
Bedford Hyndman Borough Hyndman Park -‐ Development
BRC-‐SC-‐16-‐43
$38,225 $40,000 16 Small Communities/Small Projects (COMM)
$59,245 COMM_Key
Bedford Kimmel Township Kimmel Township Community Park
BRC-‐SC-‐7-‐94
$18,955 $20,000 7 Small Communities/Small Projects (COMM)
$34,762 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 71 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Bedford Kimmel Township Queen Community Center Park
BRC-‐SC-‐14-‐92
$26,000 $35,000 14 Small Communities/Small Projects (COMM)
$32,000 COMM_Key
Bedford King Township Imler Family Park BRC-‐PRD-‐10-‐121
$54,243 $50,000 10 Park Rehabilitation and Development (COMM)
$108,486 COMM_Key
Bedford Liberty Township Saxton-‐Liberty Playground
BRC-‐SC-‐9-‐116
$24,000 $24,000 9 Small Communities/Small Projects (COMM)
$28,000 COMM_Key
Bedford Pleasantville Borough
Pleasantville Recreation Park Acquisition
BRC-‐ACQ-‐11-‐185
$8,500 $8,500 11 Acquisition (COMM)
$27,000 COMM_Key
Bedford St. Clairsville Borough
Henderson Park BRC-‐SC-‐11-‐158
$25,700 $25,000 11 Small Communities/Small Projects (COMM)
$31,400 COMM_Key
Bedford The Conservation Fund
Westvaco Corp. Property
BRC-‐LTA-‐7-‐19
$70,000 $70,000 7 Open Space Acquisition (LT)
$168,500 LT_Key
Bedford Western Pennsylvania Conservancy
3-‐Sisters Watershed Conservation Plan
BRC-‐RCP-‐9-‐17
$185,400 $140,000 9 Planning (RIV) $437,000 RIVER_Key
Bedford Western Pennsylvania Conservancy
Hardwood Trails Aquisition
BRC-‐LTA-‐17-‐213
$970,269 $970,000 17 Open Space Acquisition (LT)
$1,940,538 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 72 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Bedford Western Pennsylvania Conservancy
Shipley Tract KEY-‐LTA-‐3-‐23
$56,500 $52,000 3 Critical Habitat Acquisition (LT)
$104,000 LT_Key
Bedford Woodbury Township Community Center Playground
BRC-‐SC-‐11-‐167
$40,000 $40,000 11 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Bedford, Fulton
Bedford County Implementation Services-‐ Conservation & Greenways
BRC-‐TAG-‐14-‐251
$15,000 $15,000 14 Greenway Plans (COMM)
$30,000 COMM_Key
Berks Amity Township Leaf Creek Feasibility Study
BRC-‐TAG-‐13-‐178
$12,500 $12,500 13 Feasibility Studies (COMM)
$25,000 COMM_Key
Berks Amity Township Monacacy Hill BRC-‐ACQ-‐6-‐11
$17,500 $17,500 6 Acquisition (COMM)
$35,000 COMM_Key
Berks Bally Borough Borough Park KEY-‐SC-‐2-‐6 $20,000 $20,000 2 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Berks Bechtelsville Borough
Borough Park KEY-‐SC-‐2-‐9 $20,000 $20,000 2 Small Communities/Small Projects (COMM)
$24,000 COMM_Key
Berks Bechtelsville Borough
Borough Park KEY-‐SC-‐5-‐14 $20,000 $20,000 5 Small Communities/Small Projects (COMM)
$26,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 73 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Berks Berks County Antietam Lake Park -‐ Development
BRC-‐PRD-‐17-‐105
$354,869 $350,000 17 Park Rehabilitation and Development (COMM)
$709,738 COMM_Key
Berks Berks County Antietam Lake Park -‐ Phase 4-‐Development
BRC-‐PRD-‐18-‐49
$396,355 $217,000 18 Park Rehabilitation and Development (COMM)
$792,709 COMM_Key
Berks Berks County Greenway, Park & Recreation Plan
BRC-‐TAG-‐9-‐21
$99,500 $85,000 9 Greenway Plans (COMM)
$199,100 COMM_Key
Berks Berks County Hunsicker's Grove KEY-‐PRD-‐3-‐18
$92,000 $90,000 3 Park Rehabilitation and Development (COMM)
$184,000 COMM_Key
Berks Berks County Stonecliffe Recreation Area
BRC-‐PRD-‐13.3-‐336
$240,000 $200,000 13.3 Park Rehabilitation and Development (COMM)
$780,000 COMM_Key
Berks Berks County Conservancy
Angelica Greenway Feasibility Study
BRC-‐LTP-‐13-‐459
$35,700 $35,700 13 Feasibility Studies (COMM)
$71,400 LT_Key
Berks Berks County Conservancy
Dent Property Conservation Easement -‐ Oley Hills Area
BRC-‐LTA-‐12.5-‐3
$346,000 $346,000 12.5 Open Space Acquisition (LT)
$692,000 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 74 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Berks Berks County Conservancy
Furnace Creek Restoration (Robesonia)
KEY-‐RCD-‐5-‐1
$20,000 $50,000 5 Development (RIV)
$100,000 RIVER_Key
Berks Berks County Conservancy
Gehman Easement (Oley Hills)
BRC-‐LTA-‐16-‐233
$470,000 $200,000 16 Open Space Acquisition (LT)
$940,000 LT_Key
Berks Berks County Conservancy
Hay Creek Watershed Plan
BRC-‐RCP-‐6-‐13
$26,000 $26,000 6 Planning (RIV) $52,000 RIVER_Key
Berks Berks County Conservancy
Lobachsville Trout Hatchery
BRC-‐LTA-‐6-‐1
$101,000 $100,000 6 Critical Habitat Acquisition (LT)
$202,000 LT_Key
Berks Berks County Conservancy
Neversink Mountain Preserve
BRC-‐LTA-‐6-‐2
$153,000 $150,000 6 Critical Habitat Acquisition (LT)
$306,000 LT_Key
Berks Berks County Conservancy
Neversink Mountain Preserve
KEY-‐LTA-‐1-‐1 $149,350 $60,000 1 Critical Habitat Acquisition (LT)
$150,000 LT_Key
Berks Berks County Conservancy
Neversink Mountain Preserve
KEY-‐LTA-‐2-‐1 $36,500 $36,500 2 Critical Habitat Acquisition (LT)
$73,000 LT_Key
Berks Berks County Conservancy
Neversink Mountain Preserve
KEY-‐LTA-‐4-‐1 $23,400 $22,000 4 Critical Habitat Acquisition (LT)
$46,850 LT_Key
Berks Berks County Conservancy
Oley Hills: Jones, Kriebel and Morning Properties
BRC-‐LTA-‐15-‐113
$560,000 $455,500 15 Open Space Acquisition (LT)
$1,195,000 LT_Key
Berks Berks County Conservancy
Partners Land Acquisition
BRC-‐LTA-‐13-‐18
$77,500 $20,400 13 Critical Habitat Acquisition (LT)
$155,000 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 75 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Berks Berks County Conservancy
Roscher Tract Conservation Easement
BRC-‐LTA-‐11-‐7
$655,900 $650,000 11 Open Space Acquisition (LT)
$1,311,800 LT_Key
Berks Berks County Conservancy
Tulpehocken Creek Implementation Plan
KEY-‐RCD-‐95-‐06
$40,000 $40,000 1 Development (RIV)
$80,000 RIVER_Key
Berks Berks County Conservancy
Tulpehocken Creek Implementation Plan
KEY-‐RCD-‐95-‐17
$25,000 $25,000 1 Development (RIV)
$50,000 RIVER_Key
Berks Berks County Conservancy
Tulphehocken Creek Watershed Cons. Plan
KEY-‐RCP-‐96-‐08
$19,000 $19,000 3 Planning (RIV) $38,000 RIVER_Key
Berks Berks County Conservancy
Wyomissing Creek Plan
BRC-‐RCP-‐7-‐4
$21,000 $21,000 7 Planning (RIV) $42,000 RIVER_Key
Berks Berks County Conservation District
Cacoosing Flats Stream Restoration
BRC-‐RCD-‐8-‐8
$7,000 $7,000 8 Development (RIV)
$14,000 RIVER_Key
Berks Birdsboro Borough Feasibility Study and Master Site Plan for the Hay
BRC-‐TAG-‐12-‐279
$45,000 $75,000 12 Master Site Plans (COMM)
$150,000 COMM_Key
Berks Birdsboro Borough Mini Comprehensive Park & Recreation Plan
BRC-‐TAG-‐11-‐192
$11,000 $11,000 11 Comp. Rec., Park, & Open Space Plans (COMM)
$22,000 COMM_Key
Berks Boyertown Borough Community Park BRC-‐PRD-‐14-‐116
$83,000 $83,000 14 Park Rehabilitation and Development (COMM)
$210,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 76 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Berks Boyertown Borough Community Pool Feasibility Study
BRC-TAG-19-127
$6,200.00 $6,200.00 19 Feasibility Studies (COMM)
$12,400.00 COMM_Key
Berks Boyertown Borough Community Pool Feasibility Study
BRC-TAG-19-127
$6,200.00 $6,200.00 19 Feasibility Studies (COMM)
$12,400.00 COMM_Key
Berks Boyertown Borough Community Pool Feasibility Study
BRC-TAG-19-127
$6,200.00 $6,200.00 19 Feasibility Studies (COMM)
$12,400.00 COMM_Key
Berks Boyertown Borough Franklin Street Mini Park Rehabilitation
BRC-‐SC-‐11-‐109
$20,000 $20,000 11 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Berks Caernarvon Township
Caernarvon Township Park
BRC-‐ACQ-‐7-‐31
$119,273 $119,000 7 Acquisition (COMM)
$238,546 COMM_Key
Berks Cumru Township Warren House Recreation Area
KEY-‐ACQ-‐3-‐46
$30,000 $12,500 3 Acquisition (COMM)
$60,000 COMM_Key
Berks District Township Fischer Land Acquisition
BRC-‐ACQ-‐17-‐91
$67,800 $67,800 17 Acquisition (COMM)
$135,900 COMM_Key
Berks District Township Larchwood Parcels KEY-‐ACQ-‐3-‐47
$62,300 $62,300 3 Acquisition (COMM)
$124,600 COMM_Key
Berks District Township Manatawny Creek Watershed Rivers Cons. Pl
KEY-‐RCP-‐96-‐04
$41,000 $41,000 3 Planning (RIV) $82,000 RIVER_Key
Berks Douglass Township Ironstone Park and Township Park
BRC-‐TAG-‐7-‐50
$10,000 $10,000 7 Master Site Plans (COMM)
$20,000 COMM_Key
Berks Exeter Township Farming Ridge Park -‐ Development
BRC-‐PRD-‐16-‐136
$67,660 $67,600 16 Park Rehabilitation and Development (COMM)
$136,819 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 77 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Berks Exeter Township Pineland Park KEY-‐PRD-‐2-‐47
$134,500 $134,500 2 Park Rehabilitation and Development (COMM)
$269,000 COMM_Key
Berks Exeter Township Skate Park BRC-‐PRD-‐11-‐33
$58,800 $50,000 11 Park Rehabilitation and Development (COMM)
$117,700 COMM_Key
Berks Fleetwood Borough Community Park -‐ Phase 1(A)
BRC-‐SC-‐14-‐84
$40,000 $40,000 14 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Berks Fleetwood Borough Community Park-‐Phase 2-‐Development
BRC-‐SC-‐18-‐30
$40,000 $40,000 18 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Berks Fleetwood Borough Pool Feasibility Study BRC-‐TAG-‐17-‐8
$13,500 $13,500 17 Feasibility Studies (COMM)
$27,000 COMM_Key
Berks Hawk Mountain Sanctuary Association
Hawk Mountain Greenway Expansion
BRC-LTA-19-19
$271,664.50 $100,000.00 19 Open Space Acquisition (LT)
$543,329.00 LT_Key
Berks Hawk Mountain Sanctuary Association
Hawk Mountain Greenway Expansion
BRC-LTA-19-19
$271,664.50 $100,000.00 19 Open Space Acquisition (LT)
$543,329.00 LT_Key
Berks Hawk Mountain Sanctuary Association
Hawk Mountain Greenway Expansion
BRC-LTA-19-19
$271,664.50 $100,000.00 19 Open Space Acquisition (LT)
$543,329.00 LT_Key
Berks Hawk Mountain Sanctuary Association
Hawk Mountain Greenway Expansion
BRC-LTA-19-19
$271,664.50 $100,000.00 19 Open Space Acquisition (LT)
$543,329.00 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 78 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Berks Hay Creek Valley Historical Association
Hopewell Big Woods -‐ Joanna Furnace
BRC-‐RCD-‐13-‐3
$100,000 $120,000 13 Development (RIV)
$287,500 RIVER_Key
Berks Hay Creek Watershed Association
Riparian Buffer/Greenway Plan
BRC-‐RCI-‐10-‐14
$30,000 $30,000 10 Implementation (RIV)
$60,000 RIVER_Key
Berks Kenhorst Borough Kenhorst Park KEY-‐SC-‐3-‐100
$19,700 $19,700 3 Small Communities/Small Projects (COMM)
$27,700 COMM_Key
Berks Kutztown Borough Borough Park KEY-‐PRD-‐1-‐67
$55,170 $55,000 1 Park Rehabilitation and Development (COMM)
$110,340 COMM_Key
Berks Kutztown Borough Kutztown Master Site Plans
BRC-‐TAG-‐12-‐241
$36,700 $36,700 12 Master Site Plans (COMM)
$73,400 COMM_Key
Berks Kutztown Borough Kutztown Park-‐ Development
BRC-‐PRD-‐18-‐77
$100,000 $100,000 18 Park Rehabilitation and Development (COMM)
$200,000 COMM_Key
Berks Kutztown Borough North Park -‐ Phase 1 -‐ Development
BRC-‐PRD-‐16-‐142
$200,000 $200,000 16 Park Rehabilitation and Development (COMM)
$425,970 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 79 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Berks Kutztown Borough Swimming Pool Renovation
KEY-‐PRD-‐3-‐101
$242,400 $225,000 3 Park Rehabilitation and Development (COMM)
$484,800 COMM_Key
Berks Maxatawny Township
William DeLong Memorial Park-‐Rehabilitation
BRC-‐PRD-‐15-‐58
$36,353 $36,000 15 Park Rehabilitation and Development (COMM)
$72,705 COMM_Key
Berks Mohnton Borough Mohnton Recreation Area
KEY-‐PRD-‐5-‐133
$50,000 $50,000 5 Park Rehabilitation and Development (COMM)
$100,000 COMM_Key
Berks Mohnton Borough Recreation Area KEY-‐ACQ-‐2-‐103
$30,000 $30,000 2 Acquisition (COMM)
$60,000 COMM_Key
Berks Mt. Penn Borough Municipal Authority
Carsonia Park KEY-‐SC-‐5-‐139
$19,790 $20,000 5 Small Communities/Small Projects (COMM)
$21,290 COMM_Key
Berks Muhlenberg Township
Comp. Rec, Park & Open Space Plan
BRC-‐TAG-‐8-‐128
$30,000 $30,000 8 Comp. Rec., Park, & Open Space Plans (COMM)
$60,000 COMM_Key
Berks Muhlenberg Township
Dietrich Farm KEY-‐ACQ-‐4-‐108
$300,000 $100,000 4 Acquisition (COMM)
$1,200,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 80 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Berks Muhlenberg Township
Jim Dietrich Park -‐ Phase I
BRC-‐PRD-‐13.3-‐403
$200,000 $200,000 13.3 Park Rehabilitation and Development (COMM)
$807,500 COMM_Key
Berks Muhlenberg Township
Laurel Run BRC-‐RCP-‐7-‐11
$18,500 $18,000 7 Planning (RIV) $55,000 RIVER_Key
Berks Muhlenberg Township
Master Plans for 2 Parks
BRC-‐TAG-‐9-‐144
$32,500 $30,000 9 Master Site Plans (COMM)
$75,000 COMM_Key
Berks Natural Lands Trust, Inc.
Green Hills Fee Acquisition
BRC-‐LTA-‐17-‐215
$1,065,000 $1,065,000 17 Open Space Acquisition (LT)
$2,130,000 LT_Key
Berks Natural Lands Trust, Inc.
Green Hills Preserve Conservation Stewardship Plan
BRC-LTP-19-150
$20,000.00 $20,000.00 19 Open Space Planning (LT)
$40,000.00 LT_Key
Berks Natural Lands Trust, Inc.
Green Hills Preserve Conservation Stewardship Plan
BRC-LTP-19-150
$20,000.00 $20,000.00 19 Open Space Planning (LT)
$40,000.00 LT_Key
Berks Natural Lands Trust, Inc.
Green Hills Preserve Conservation Stewardship Plan
BRC-LTP-19-150
$20,000.00 $20,000.00 19 Open Space Planning (LT)
$40,000.00 LT_Key
Berks Natural Lands Trust, Inc.
Hay Creek Watershed Property Acquisition
BRC-‐LTA-‐18-‐13
$278,000 $135,000 18 Open Space Acquisition (LT)
$556,000 LT_Key
Berks Natural Lands Trust, Inc.
Killian Woods Acquisition
BRC-LTA-19-25
$834,500.00 $834,500.00 19 Open Space Acquisition (LT)
$1,669,000.00 LT_Key
Berks Natural Lands Trust, Inc.
Killian Woods Acquisition
BRC-LTA-19-25
$834,500.00 $834,500.00 19 Open Space Acquisition (LT)
$1,669,000.00 LT_Key
Berks Natural Lands Trust, Inc.
Killian Woods Acquisition
BRC-LTA-19-25
$834,500.00 $834,500.00 19 Open Space Acquisition (LT)
$1,669,000.00 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 81 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Berks Natural Lands Trust, Inc.
Killian Woods Acquisition
BRC-LTA-19-25
$834,500.00 $834,500.00 19 Open Space Acquisition (LT)
$1,669,000.00 LT_Key
Berks Natural Lands Trust, Inc.
Yelenoc Acquisition (previously was Sheeder)
BRC-‐LTA-‐13-‐19
$1,222,400 $1,220,000 13 Open Space Acquisition (LT)
$2,444,800 LT_Key
Berks Pine Creek Valley Watershed Associaiton
Headwaters Protection
BRC-‐LTA-‐9-‐19
$36,500 $36,000 9 Open Space Acquisition (LT)
$73,000 LT_Key
Berks Reading City 11th and Pike Playground-‐Development
BRC-‐PRD-‐17-‐148
$100,000 $100,000 17 Park Rehabilitation and Development (COMM)
$300,000 COMM_Key
Berks Reading City 11th and Pike Recreation Center
KEY-‐PRD-‐1-‐113
$225,000 $150,000 1 Park Rehabilitation and Development (COMM)
$966,590 COMM_Key
Berks Reading City Angelica Creek Trail-‐Phase I
BRC-‐PRD-‐14-‐166
$18,000 $18,000 14 Park Rehabilitation and Development (COMM)
$36,000 COMM_Key
Berks Reading City Baer Park Playground -‐ Rehabilitation
BRC-‐PRD-‐12-‐193
$100,000 $100,000 12 Park Rehabilitation and Development (COMM)
$200,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 82 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Berks Reading City Brookline Playground
BRC-‐PRD-‐11-‐73
$106,000 $100,000 11 Park Rehabilitation and Development (COMM)
$212,000 COMM_Key
Berks Reading City Circuit Rider BRC-‐TAG-‐16-‐256
$190,500 $118,125 16 Circuit Rider (COMM)
$303,000 COMM_Key
Berks Reading City Essick and 3rd & Spring Playgrounds
BRC-‐PRD-‐13.3-‐419
$137,500 $137,000 13.3 Park Rehabilitation and Development (COMM)
$275,000 COMM_Key
Berks Reading City Keffer Park-‐Development
BRC-‐PRD-‐18-‐95
$100,000 $100,000 18 Park Rehabilitation and Development (COMM)
$225,000 COMM_Key
Berks Reading City Kerper's Landing BRC-‐PRD-‐13-‐137
$40,800 $40,000 13 Park Rehabilitation and Development (COMM)
$81,600 COMM_Key
Berks Reading City Lance Place and Second & Oley Playgrounds
KEY-‐PRD-‐5-‐169
$107,000 $100,000 5 Park Rehabilitation and Development (COMM)
$214,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 83 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Berks Reading City Northmont Playground
BRC-‐PRD-‐14-‐167
$100,000 $100,000 14 Park Rehabilitation and Development (COMM)
$200,000 COMM_Key
Berks Reading City Peer to Peer Study BRC-‐TAG-‐16-‐10
$10,000 $10,000 16 Peer-‐to-‐Peer Tech. Assistance (COMM)
$11,000 COMM_Key
Berks Reading City Three Sites KEY-‐PRD-‐2-‐130
$146,000 $146,000 2 Park Rehabilitation and Development (COMM)
$292,000 COMM_Key
Berks Reading City TreeVitalize Metros BRC-‐TV-‐15-‐11
$100,000 $100,000 15 Park Rehabilitation and Development (COMM)
$200,000 COMM_Key
Berks Reading Recreation Commission
Comprehensive Recreation, Park and Greenways Plan
BRC-TAG-19-143
$72,000.00 $72,000.00 19 Comp. Rec., Park, & Open Space Plans (COMM)
$80,000.00 COMM_Key
Berks Reading Recreation Commission
Comprehensive Recreation, Park and Greenways Plan
BRC-TAG-19-143
$72,000.00 $72,000.00 19 Comp. Rec., Park, & Open Space Plans (COMM)
$80,000.00 COMM_Key
Berks Reading Recreation Commission
Comprehensive Recreation, Park and Greenways Plan
BRC-TAG-19-143
$72,000.00 $72,000.00 19 Comp. Rec., Park, & Open Space Plans (COMM)
$80,000.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 84 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Berks Schuylkill River Greenway Association
Bartram Trail BRC-‐RTD-‐6-‐17
$50,000 $120,000 6 Rail Rehabilitation and Development (RT)
$232,000 RT_Key
Berks Schuylkill River Greenway Association
Schuylkill River Trail: Leesport Gap
BRC-‐RCD-‐17-‐225
$76,595 $76,500 17 Development (RIV)
$153,190 RIVER_Key
Berks Shillington Borough Governor Mifflin Coordinating Council Peer-‐to-‐Peer Study
BRC-‐TAG-‐16-‐241
$10,000 $10,000 16 Peer-‐to-‐Peer Tech. Assistance (COMM)
$11,000 COMM_Key
Berks Shoemakersville Borough
Shoemakersville Community Swimming Pool-‐Development
BRC-‐PRD-‐18-‐99
$309,479 $310,000 18 Park Rehabilitation and Development (COMM)
$618,959 COMM_Key
Berks Shoemakersville Borough
Skatepark BRC-‐SC-‐9-‐187
$40,000 $40,000 9 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Berks Spring Township Comprehensive Recreation & Park Plan
BRC-‐TAG-‐12-‐262
$21,000 $21,000 12 Comp. Rec., Park, & Open Space Plans (COMM)
$42,000 COMM_Key
Berks Spring Township Greenway Study BRC-‐TAG-‐10-‐170
$12,245 $12,000 10 Greenway Plans (COMM)
$24,490 COMM_Key
Berks Spring Township Shiloh Hills Park Expansion
BRC-‐ACQ-‐8-‐184
$200,000 $200,000 8 Acquisition (COMM)
$767,100 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 85 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Berks Spring Township Shiloh Hills Park Phase I
BRC-‐PRD-‐11-‐85
$200,000 $200,000 11 Park Rehabilitation and Development (COMM)
$700,000 COMM_Key
Berks Spring Township South Central Park KEY-‐ACQ-‐4-‐146
$120,000 $100,000 4 Acquisition (COMM)
$403,900 COMM_Key
Berks St. Lawrence Borough
Borough Park KEY-‐SC-‐2-‐149
$20,000 $20,000 2 Small Communities/Small Projects (COMM)
$21,900 COMM_Key
Berks Topton Borough Pool Rehabilitation BRC-‐PRD-‐11.5-‐19
$144,500 $140,000 11.5 Park Rehabilitation and Development (COMM)
$289,100 COMM_Key
Berks Tulpehocken Chapter Trout Unlimited
Pine Creek Coult Property Restoration
BRC-‐RCD-‐8-‐10
$14,900 $15,000 8 Development (RIV)
$30,000 RIVER_Key
Berks Union Township Recreation Area Improvements
BRC-‐PRD-‐11-‐92
$50,000 $50,000 11 Park Rehabilitation and Development (COMM)
$200,000 COMM_Key
Berks Union Township Recreation Area Master Plan
BRC-‐TAG-‐7-‐194
$20,000 $20,000 7 Master Site Plans (COMM)
$40,000 COMM_Key
Berks Union Township Recreation Land Acquisition
BRC-‐ACQ-‐12-‐65
$12,000 $12,000 12 Acquisition (COMM)
$24,100 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 86 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Berks Union Township Schuylkill River Trail, Thun Section Bridge Study
BRC-‐TAG-‐18-‐161
$55,000 $55,000 18 Trail Study (COMM)
$115,000 COMM_Key
Berks Upper Bern Township
Shartlesville Community Park Restrooms Renovation
BRC-‐PRD-‐12-‐211
$40,000 $40,000 12 Park Rehabilitation and Development (COMM)
$80,000 COMM_Key
Berks Upper Tulpehocken Township
Recreation Park BRC-‐PRD-‐10-‐141
$315,000 $50,000 10 Park Rehabilitation and Development (COMM)
$695,500 COMM_Key
Berks Washington Township
Feasibility Study KEY-‐RTP-‐95-‐29
$4,500 $4,500 1 Feasibility Studies (RT)
$9,000 RT_Key
Berks Washington Township
Memorial Park KEY-‐SC-‐2-‐167
$20,000 $20,000 2 Small Communities/Small Projects (COMM)
$24,000 COMM_Key
Berks Washington Township
Township Park KEY-‐SC-‐5-‐214
$20,000 $20,000 5 Small Communities/Small Projects (COMM)
$27,000 COMM_Key
Berks Washington Township
Township Park Rehab
BRC-‐SC-‐11-‐162
$38,700 $38,000 11 Small Communities/Small Projects (COMM)
$57,500 COMM_Key
Berks Washington Township
Washington Township Park
BRC-‐SC-‐7-‐205
$30,000 $30,000 7 Small Communities/Small Projects (COMM)
$40,254 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 87 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Berks West Lawn Borough Community Park KEY-‐SC-‐5-‐224
$20,000 $20,000 5 Small Communities/Small Projects (COMM)
$23,868 COMM_Key
Berks West Reading Borough
West Reading Park BRC-‐PRD-‐13.6-‐576
$19,300 $19,300 13.6 Park Rehabilitation and Development (COMM)
$38,500 COMM_Key
Berks West Reading Borough
West Reading Playground-‐Rehabilitation
BRC-‐SC-‐15-‐84
$40,000 $40,000 15 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Berks Windsor Township Windsor Township Park
BRC-‐PRD-‐6-‐201
$24,250 $24,000 6 Park Rehabilitation and Development (COMM)
$48,500 COMM_Key
Berks, Chester French & Pickering Creeks Conservation Trust, Inc.
Pine Swamp KEY-‐LTA-‐4-‐6 $481,500 $450,000 4 Critical Habitat Acquisition (LT)
$963,000 LT_Key
Berks, Chester Natural Lands Trust, Inc.
Compatible Economic Development Plan for Middle Schuylkill
BRC-‐LTP-‐13-‐523
$60,500 $60,500 13 Open Space Planning (LT)
$121,000 LT_Key
Berks, Chester, Montgomery
Natural Lands Trust, Inc.
Schuylkill Highlands Conservation Landscape Implementation 2014
BRC-SR-19-176
$213,486.80 $25,000.00 19 Partnerships Projects
$406,974.20 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 88 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Berks, Chester, Montgomery
Natural Lands Trust, Inc.
Schuylkill Highlands Conservation Landscape Implementation 2014
BRC-SR-19-176
$213,486.80 $25,000.00 19 Partnerships Projects
$406,974.20 LT_Key
Berks, Chester, Montgomery
Natural Lands Trust, Inc.
Schuylkill Highlands Conservation Landscape Implementation 2014
BRC-SR-19-176
$213,486.80 $25,000.00 19 Partnerships Projects
$406,974.20 LT_Key
Berks, Chester, Montgomery
Natural Lands Trust, Inc.
Schuylkill Highlands Conservation Landscape Implementation 2014
BRC-SR-19-176
$213,486.80 $25,000.00 19 Partnerships Projects
$406,974.20 LT_Key
Berks, Chester, Montgomery
Natural Lands Trust, Inc.
Schuylkill Highlands Conservation Landscape Implementation 2014
BRC-SR-19-176
$213,486.80 $25,000.00 19 Partnerships Projects
$406,974.20 LT_Key
Berks, Chester, Montgomery
Natural Lands Trust, Inc.
Schuylkill Highlands Conservation Landscape Implementation 2014
BRC-SR-19-176
$213,486.80 $25,000.00 19 Partnerships Projects
$406,974.20 LT_Key
Berks, Chester, Montgomery
Natural Lands Trust, Inc.
Schuylkill Highlands Conservation Landscape Implementation 2014
BRC-SR-19-176
$213,486.80 $25,000.00 19 Partnerships Projects
$406,974.20 LT_Key
Berks, Chester, Montgomery
Natural Lands Trust, Inc.
Schuylkill Highlands Conservation Landscape Implementation 2014
BRC-SR-19-176
$213,486.80 $25,000.00 19 Partnerships Projects
$406,974.20 LT_Key
Berks, Chester, Montgomery
Natural Lands Trust, Inc.
Schuylkill Highlands Conservation Landscape Implementation 2014
BRC-SR-19-176
$213,486.80 $25,000.00 19 Partnerships Projects
$406,974.20 LT_Key
Berks, Chester, Montgomery
Natural Lands Trust, Inc.
Schuylkill Highlands Conservation Landscape Implementation 2014
BRC-SR-19-176
$213,486.80 $25,000.00 19 Partnerships Projects
$406,974.20 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 89 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Berks, Chester, Montgomery
Natural Lands Trust, Inc.
Schuylkill Highlands Conservation Landscape Implementation 2014
BRC-SR-19-176
$213,486.80 $25,000.00 19 Partnerships Projects
$406,974.20 LT_Key
Berks, Lehigh Albany Township Upper Maiden Creek BRC-‐RCP-‐7-‐2
$25,000 $25,000 7 Planning (RIV) $50,000 RIVER_Key
Blair Altoona City Four Sites KEY-‐PRD-‐1-‐3
$133,000 $75,000 1 Park Rehabilitation and Development (COMM)
$266,000 COMM_Key
Blair Altoona City Westfall Park KEY-‐PRD-‐4-‐9
$75,000 $75,000 4 Park Rehabilitation and Development (COMM)
$150,000 COMM_Key
Blair Bellwood Borough Bellwood Greenway Study & Plan
KEY-‐RTP-‐4-‐5 $4,000 $4,000 4 Feasibility Studies (RT)
$8,000 RT_Key
Blair Bellwood Borough Bellwood Park BRC-‐SC-‐8-‐21
$27,300 $27,000 8 Small Communities/Small Projects (COMM)
$34,600 COMM_Key
Blair Bellwood Borough Bellwood-‐Antis Pool Renovation
KEY-‐SC-‐3-‐15 $20,000 $20,000 3 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Blair Bellwood Borough Community Swimming Pool
BRC-‐PRD-‐13-‐89
$164,100 $287,000 13 Park Rehabilitation and Development (COMM)
$328,100 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 90 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Blair Blair County Fort Roberdeau Historic Site & Natural Area
BRC-‐ACQ-‐7-‐21
$281,500 $250,000 7 Acquisition (COMM)
$563,000 COMM_Key
Blair Blair Township Fort Fetter Community Park Acquisition
BRC-‐ACQ-‐9-‐23
$40,900 $40,000 9 Acquisition (COMM)
$81,800 COMM_Key
Blair Central Blair County Recreation and Park Commission
Circuit Rider -‐(Year 3)
KEY-‐TAG-‐2-‐25
$18,928 $18,900 2 Circuit Rider (COMM)
$37,856 COMM_Key
Blair Duncansville Borough
Duncansville Memorial Park
BRC-‐SC-‐7-‐53
$25,500 $25,000 7 Small Communities/Small Projects (COMM)
$33,327 COMM_Key
Blair Greenfield Township Claysburg Area Community Park
BRC-‐SC-‐9-‐87
$32,700 $30,000 9 Small Communities/Small Projects (COMM)
$49,500 COMM_Key
Blair Greenfield Township Claysburg Community Park
KEY-‐SC-‐5-‐74 $20,000 $20,000 5 Small Communities/Small Projects (COMM)
$22,000 COMM_Key
Blair Hollidaysburg Borough
Beaverdam Branch Greenway
KEY-‐TAG-‐5-‐17
$20,000 $20,000 5 Greenway Plans (COMM)
$40,000 COMM_Key
Blair Hollidaysburg Borough
Chimney Rocks Park KEY-‐PRD-‐3-‐90
$125,000 $125,000 3 Park Rehabilitation and Development (COMM)
$250,000 COMM_Key
Blair Hollidaysburg Borough
Chimney Rocks Park Addition
BRC-‐ACQ-‐6-‐84
$71,500 $50,000 6 Acquisition (COMM)
$143,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 91 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Blair Hollidaysburg Borough
Hollidaysburg Canal Basin Park-‐Phase V
BRC-‐PRD-‐8-‐86
$291,300 $181,300 8 Park Rehabilitation and Development (COMM)
$582,500 COMM_Key
Blair Hollidaysburg Borough
Peer Study BRC-‐TAG-‐9-‐1
$7,500 $7,500 9 Peer-‐to-‐Peer Tech. Assistance (COMM)
$8,250 COMM_Key
Blair Logan Township Logan Township Wellness Trail
BRC-‐PRD-‐14-‐151
$74,600 $74,600 14 Park Rehabilitation and Development (COMM)
$149,100 COMM_Key
Blair Martinsburg Borough
Hershberger Pool KEY-‐PRD-‐3-‐128
$70,442 $50,000 3 Park Rehabilitation and Development (COMM)
$140,884 COMM_Key
Blair Rails-‐To-‐Trails of Central Pennsylvania, Inc.
Canoe Creek Extension of Lower Trail
KEY-‐RTD-‐5-‐15
$125,000 $125,000 5 Rail Rehabilitation and Development (RT)
$250,000 RT_Key
Blair Rails-‐To-‐Trails of Central Pennsylvania, Inc.
Lower Trail Gap Feasibility Study
BRC-‐RTP-‐14-‐283
$22,500 $22,500 14 Feasibility Studies (RT)
$45,000 RT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 92 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Blair Tyrone Borough Reservoir Park BRC-‐PRD-‐7-‐193
$65,000 $65,000 7 Park Rehabilitation and Development (COMM)
$130,000 COMM_Key
Blair Tyrone Borough Reservoir Park -‐ Phases 1 & 2 Development
BRC-‐PRD-‐12-‐209
$110,000 $110,000 12 Park Rehabilitation and Development (COMM)
$220,000 COMM_Key
Blair Williamsburg Borough
Peer-‐to-‐Peer BRC-‐TAG-‐7-‐6
$7,500 $7,500 7 Peer-‐to-‐Peer Tech. Assistance (COMM)
$8,250 COMM_Key
Blair Williamsburg Borough
Riverside Park KEY-‐SC-‐2-‐178
$20,000 $20,000 2 Small Communities/Small Projects (COMM)
$21,200 COMM_Key
Blair, Cambria Cambria County Conservation and Recreation Authority
Rehabilitate the 6-‐10 Trail
BRC-‐PRT-‐13-‐23
$579,700 $279,000 13 Construction $724,700 COMM_Key
Blair, Huntingdon
Little Juniata River Association
Upper Juniata Public Access Easements
BRC-‐RCA-‐14-‐292
$130,000 $200,000 14 Acquisition (RIV)
$260,000 RIVER_Key
Blair, Huntingdon
Rails-‐To-‐Trails of Central Pennsylvania, Inc.
Lower Trail BRC-‐RTD-‐11-‐10
$344,400 $200,000 11 Rail Rehabilitation and Development (RT)
$688,800 RT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 93 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Bradford Athens Borough Borough Park KEY-‐SC-‐2-‐4 $17,569 $17,500 2 Small Communities/Small Projects (COMM)
$21,569 COMM_Key
Bradford Athens Borough Peer-‐to-‐Peer BRC-‐TAG-‐10-‐6
$7,500 $7,500 10 Peer-‐to-‐Peer Tech. Assistance (COMM)
$8,250 COMM_Key
Bradford Athens Borough Valley Recreation Center
KEY-‐PRD-‐5-‐9
$37,120 $37,100 5 Park Rehabilitation and Development (COMM)
$74,240 COMM_Key
Bradford Bradford County Bradford County Parks Master Plans
BRC-‐TAG-‐13.6-‐587
$64,900 $64,900 13.6 Master Site Plans (COMM)
$129,800 COMM_Key
Bradford Bradford County Hornbrook Park Boat Launch
BRC-‐PRD-‐11-‐9
$28,700 $25,000 11 Park Rehabilitation and Development (COMM)
$71,400 COMM_Key
Bradford Bradford County Larnard-Hornbrook Park– Development
BRC-PRD-19-60
$58,600.00 $58,000.00 19 Park Rehabilitation and Development (COMM)
$117,820.00 COMM_Key
Bradford Bradford County Larnard-Hornbrook Park– Development
BRC-PRD-19-60
$58,600.00 $58,000.00 19 Park Rehabilitation and Development (COMM)
$117,820.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 94 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Bradford Bradford County Larnard-Hornbrook Park– Development
BRC-PRD-19-60
$58,600.00 $58,000.00 19 Park Rehabilitation and Development (COMM)
$117,820.00 COMM_Key
Bradford Bradford County Open Space, Greenways and Outdoor Rec. Plan
BRC-‐TAG-‐9-‐28
$47,200 $45,000 9 Greenway Plans (COMM)
$90,000 COMM_Key
Bradford Bradford County Peer-‐to-‐Peer Technical Assistance
BRC-‐TAG-‐18-‐139
$10,000 $10,000 18 Peer-‐to-‐Peer Tech. Assistance (COMM)
$11,000 COMM_Key
Bradford Bradford County Sunfish Pond County Park Development
BRC-‐PRD-‐18-‐51
$79,300 $79,000 18 Park Rehabilitation and Development (COMM)
$159,830 COMM_Key
Bradford Bradford County Conservation District
Wilbur Beers Natural Area
BRC-‐PRD-‐7-‐24
$28,000 $20,000 7 Park Rehabilitation and Development (COMM)
$56,728 COMM_Key
Bradford Central Bradford County Economic Development Authority
East Side Memorial Riverfront Park
KEY-‐PRD-‐1-‐30
$200,000 $130,000 1 Park Rehabilitation and Development (COMM)
$400,600 COMM_Key
Bradford Monroe Borough Monroeton Park BRC-‐SC-‐11-‐137
$8,700 $24,000 11 Small Communities/Small Projects (COMM)
$31,300 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 95 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Bradford Ridgebury Township Ridgebury Township Park
BRC-‐SC-‐10-‐95
$40,000 $40,000 10 Small Communities/Small Projects (COMM)
$149,000 COMM_Key
Bradford Towanda Borough Comm. Gateways & Garden Program
KEY-‐SC-‐4-‐150
$20,000 $20,000 4 Small Communities/Small Projects (COMM)
$32,100 COMM_Key
Bradford Towanda Borough Phase I -‐ SCI Complex Renovation
BRC-‐PRD-‐10-‐11
$100,000 $100,000 10 Park Rehabilitation and Development (COMM)
$259,500 COMM_Key
Bradford Towanda Borough SCI/YMCA Recreation Center
BRC-‐PRD-‐13.3-‐438
$135,000 $235,000 13.3 Park Rehabilitation and Development (COMM)
$284,000 COMM_Key
Bradford Towanda Borough Third Ward Playground
KEY-‐SC-‐3-‐220
$20,000 $20,000 3 Small Communities/Small Projects (COMM)
$31,200 COMM_Key
Bradford Troy Borough Troy Pool Rehab BRC-‐SC-‐11-‐160
$24,000 $24,000 11 Small Communities/Small Projects (COMM)
$28,000 COMM_Key
Bradford Warren Township Community Park BRC-‐SC-‐6-‐189
$20,000 $20,000 6 Small Communities/Small Projects (COMM)
$27,142 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 96 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Bradford Warren Township Community Park -‐ Development
BRC-‐SC-‐16-‐49
$39,990 $40,000 16 Small Communities/Small Projects (COMM)
$59,981 COMM_Key
Bradford Wells Township Community Park Playground Equipment
BRC-‐SC-‐8-‐211
$29,200 $29,000 8 Small Communities/Small Projects (COMM)
$38,300 COMM_Key
Bradford Wyalusing Borough Park Expansion Acquisition
BRC-‐ACQ-‐12-‐66
$17,500 $17,500 12 Acquisition (COMM)
$35,000 COMM_Key
Bradford Wyalusing Borough Wyalusing Park Rehabilitation
BRC-‐SC-‐10-‐106
$20,000 $20,000 10 Small Communities/Small Projects (COMM)
$32,600 COMM_Key
Bradford, Luzerne
Avoca Borough Greenway Plan KEY-‐TAG-‐1-‐7
$5,000 $5,000 1 Greenway Plans (COMM)
$10,000 COMM_Key
Bradford, Luzerne, Sullivan, Wyoming
Pennsylvania Environmental Council, Inc.
Mehoopany Creek River Conservation Plan
BRC-‐RCP-‐8-‐11
$34,100 $34,000 8 Planning (RIV) $68,300 RIVER_Key
Bradford, Sullivan, Tioga
Bradford County Conservation District
Sugar & Towanda Creeks Watersheds RCP
BRC-‐RCP-‐11-‐4
$107,400 $100,000 11 Planning (RIV) $247,700 RIVER_Key
Bucks American Littoral Soc/Delaware Riverkeeper Network
Upper & Middle Neshaminy Watershed Plan
BRC-‐RCP-‐6-‐9
$62,500 $62,500 6 Planning (RIV) $125,000 RIVER_Key
Bucks Bensalem Township Bensalem Twp. Greenway Plan
KEY-‐RCI-‐6-‐7 $75,000 $75,000 6 Implementation (RIV)
$176,000 RIVER_Key
Keystone Fund Projects by County (1994-‐2013)
Page 97 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Bucks Bensalem Township Richlieu Park KEY-‐PRD-‐4-‐13
$200,000 $100,000 4 Park Rehabilitation and Development (COMM)
$400,000 COMM_Key
Bucks Bridgeton Township Tinicum Creek Watershed Demonstration Project
BRC-‐RCP-‐7-‐5
$31,000 $12,000 7 Planning (RIV) $62,000 RIVER_Key
Bucks Bristol Borough Bristol Spurline Extension
KEY-‐RTD-‐4-‐6
$45,000 $45,000 4 Rail Rehabilitation and Development (RT)
$95,700 RT_Key
Bucks Bristol Borough Bristol Spurline Extension Riverfront N. Section
BRC-‐RCD-‐6-‐6
$100,000 $100,000 6 Development (RIV)
$300,000 RIVER_Key
Bucks Bristol Borough Bristol Spurline Park Trail-‐Del. River Access Sec.
BRC-‐PRD-‐8-‐26
$100,000 $100,000 8 Park Rehabilitation and Development (COMM)
$215,000 COMM_Key
Bucks Bristol Borough Delaware Canal KEY-‐ACQ-‐5-‐24
$100,000 $100,000 5 Acquisition (COMM)
$200,000 COMM_Key
Bucks Bristol Borough Spurline Park Extension
KEY-‐RTD-‐95-‐5
$46,000 $46,000 1 Rail Rehabilitation and Development (RT)
$92,200 RT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 98 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Bucks Bristol Township Black Ditch Creek Trail Implementation Study
BRC-‐RCI-‐6-‐5 $15,000 $15,000 6 Implementation (RIV)
$30,000 RIVER_Key
Bucks Bristol Township Croydon Acres Park KEY-‐PRD-‐5-‐25
$65,100 $65,000 5 Park Rehabilitation and Development (COMM)
$130,200 COMM_Key
Bucks Buckingham Township
Hansel Park KEY-‐PRD-‐1-‐22
$56,000 $56,000 1 Park Rehabilitation and Development (COMM)
$112,000 COMM_Key
Bucks Buckingham Township
Holicong Park Master Site Plan
BRC-‐TAG-‐16-‐53
$24,425 $24,400 16 Master Site Plans (COMM)
$48,850 COMM_Key
Bucks Bucks County Churchville Nature Center Plan
BRC-‐TAG-‐7-‐27
$40,000 $40,000 7 Master Site Plans (COMM)
$102,000 COMM_Key
Bucks Bucks County Churchville Nature Center Plan
BRC-‐TAG-‐7-‐27
$40,000 $11,000 7 Master Site Plans (COMM)
$102,000 COMM_Key
Bucks Bucks County CPROSP, Greenway Plan, and NAI Update
BRC-‐TAG-‐13-‐179
$130,200 $130,000 13 Comp. Rec., Park, & Open Space Plans (COMM)
$260,500 COMM_Key
Bucks Bucks County Lockheed-‐Martin Open Space
KEY-‐ACQ-‐2-‐21
$500,000 $500,000 2 Acquisition (COMM)
$1,500,000 COMM_Key
Bucks Bucks County Middle Neshaminy Creek Greenway -‐ Multi-‐use Trail Feasibility Study
BRC-‐TAG-‐18-‐156
$45,000 $40,000 18 Trail Study (COMM)
$90,150 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 99 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Bucks Bucks County Neshaminy Creek Land Acquisition
BRC-‐ACQ-‐8-‐27
$175,000 $175,000 8 Acquisition (COMM)
$350,000 COMM_Key
Bucks Bucks County Peace Valley Nature Center
KEY-‐PRD-‐1-‐23
$120,000 $100,000 1 Park Rehabilitation and Development (COMM)
$240,000 COMM_Key
Bucks Bucks County Peace Valley Park BRC-‐PRD-‐7-‐28
$250,000 $250,000 7 Park Rehabilitation and Development (COMM)
$500,000 COMM_Key
Bucks Chalfont Borough Breitinger Tract Acquisition
BRC-‐ACQ-‐12.5-‐12
$200,000 $200,000 12.5 Acquisition (COMM)
$400,000 COMM_Key
Bucks Chalfont Borough Chestnut Street Park KEY-‐SC-‐3-‐37 $20,000 $20,000 3 Small Communities/Small Projects (COMM)
$34,900 COMM_Key
Bucks Chalfont Borough Kelly Park-‐ Development
BRC-‐PRD-‐18-‐53
$173,749 $173,700 18 Park Rehabilitation and Development (COMM)
$347,498 COMM_Key
Bucks Chalfont Borough Muncipal Parks Master Site Plans
BRC-‐TAG-‐14-‐193
$18,600 $18,600 14 Master Site Plans (COMM)
$37,200 COMM_Key
Bucks Chalfont Borough Tri-‐municipal Master Trail and Greenway Plan
BRC-‐TAG-‐12-‐230
$40,000 $40,000 12 Greenway Plans (COMM)
$80,000 COMM_Key
Bucks Doylestown Township
Community Trail Feasibility Study
BRC-‐TAG-‐14-‐198
$17,500 $17,500 14 Trail Study (COMM)
$35,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 100 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Bucks Doylestown Township
Destination Peace Valley Pedestrian Trail and Bridge -‐ Development
BRC-‐PRD-‐18-‐63
$200,297 $200,000 18 Park Rehabilitation and Development (COMM)
$400,594 COMM_Key
Bucks Doylestown Township
Municipal Bicycle Path
KEY-‐PRD-‐2-‐38
$49,780 $40,000 2 Park Rehabilitation and Development (COMM)
$99,560 COMM_Key
Bucks Doylestown Township
Rec., Park & Open Space Plan
BRC-‐TAG-‐9-‐65
$25,000 $25,000 9 Comp. Rec., Park, & Open Space Plans (COMM)
$50,000 COMM_Key
Bucks Durham Township Kerl Easement BRC-‐ACQ-‐13.3-‐542
$397,950 $295,000 13.3 Acquisition (COMM)
$795,900 COMM_Key
Bucks Durham Township Wallace Frank Conservation Easement
BRC-‐ACQ-‐14-‐52
$298,000 $298,000 14 Acquisition (COMM)
$715,600 COMM_Key
Bucks Falls Township Biles Island Master Site Plan
BRC-‐TAG-‐18-‐146
$210,000 $92,000 18 Master Site Plans (COMM)
$420,000 COMM_Key
Bucks Falls Township Coastal Plain Forest Nature Preserve
BRC-‐ACQ-‐6-‐63
$228,000 $228,000 6 Acquisition (COMM)
$482,300 COMM_Key
Bucks Haycock Township Schoenfeld Conservation Easement
BRC-‐ACQ-‐9-‐91
$145,000 $145,000 9 Acquisition (COMM)
$292,000 COMM_Key
Bucks Heritage Conservancy
Bellwood Preserve North Master Site Plan
BRC-‐LTP-‐14-‐209
$38,500 $38,500 14 Critical Habitat Planning (LT)
$80,900 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 101 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Bucks Heritage Conservancy
Bristol Marsh Conservation Plan
BRC-‐LTP-‐13.3-‐545
$14,600 $14,600 13.3 Open Space Planning (LT)
$32,600 LT_Key
Bucks Heritage Conservancy
Camp Ockanickon BRC-‐LTA-‐6-‐11
$231,400 $200,000 6 Critical Habitat Acquisition (LT)
$477,000 LT_Key
Bucks Heritage Conservancy
Cory Property Conservation Easement
BRC-‐LTA-‐12.5-‐1
$387,700 $385,000 12.5 Critical Habitat Acquisition (LT)
$775,500 LT_Key
Bucks Heritage Conservancy Croydon Woods Acquisition
BRC-LTA-19-20
########## ########## 19 Open Space Acquisition (LT)
$5,870,000.00 LT_Key
Bucks Heritage Conservancy Croydon Woods Acquisition
BRC-LTA-19-20
########## ########## 19 Open Space Acquisition (LT)
$5,870,000.00 LT_Key
Bucks Heritage Conservancy Croydon Woods Acquisition
BRC-LTA-19-20
########## ########## 19 Open Space Acquisition (LT)
$5,870,000.00 LT_Key
Bucks Heritage Conservancy Dorey Property Conservation Easement
BRC-LTA-19-21
$750,067.00 $501,000.00 19 Critical Habitat Acquisition (LT)
$1,500,134.00 LT_Key
Bucks Heritage Conservancy Dorey Property Conservation Easement
BRC-LTA-19-21
$750,067.00 $501,000.00 19 Critical Habitat Acquisition (LT)
$1,500,134.00 LT_Key
Bucks Heritage Conservancy Dorey Property Conservation Easement
BRC-LTA-19-21
$750,067.00 $501,000.00 19 Critical Habitat Acquisition (LT)
$1,500,134.00 LT_Key
Bucks Heritage Conservancy
Farbotnik Conservation Easement
BRC-‐LTA-‐14-‐31
$182,250 $179,000 14 Critical Habitat Acquisition (LT)
$364,500 LT_Key
Bucks Heritage Conservancy
Hoffman Property Conservation Easement
BRC-‐LTA-‐17-‐54
$102,975 $102,900 17 Open Space Acquisition (LT)
$394,900 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 102 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Bucks Heritage Conservancy
Honey Hollow Conservation and Watershed Protection Model
BRC-‐LTP-‐14-‐210
$16,000 $16,000 14 Critical Habitat Planning (LT)
$32,000 LT_Key
Bucks Heritage Conservancy
Jenkins-‐Moyer Conservation Easement
BRC-‐LTA-‐13-‐20
$161,000 $161,000 13 Open Space Acquisition (LT)
$337,000 LT_Key
Bucks Heritage Conservancy
Limantour Property Conservation Easement
BRC-‐LTA-‐11-‐12
$88,000 $67,000 11 Open Space Acquisition (LT)
$176,000 LT_Key
Bucks Heritage Conservancy
Little Neshaminy Creek Rivers Conserv. Plan
BRC-‐RCP-‐10-‐3
$51,300 $63,000 10 Planning (RIV) $106,500 RIVER_Key
Bucks Heritage Conservancy
Lower Delaware River Conservation Plan
KEY-‐RCP-‐96-‐03
$25,000 $65,000 3 Planning (RIV) $50,000 RIVER_Key
Bucks Heritage Conservancy
Lower Neshaminy Creek
BRC-‐RCP-‐7-‐8
$80,175 $80,000 7 Planning (RIV) $174,363 RIVER_Key
Bucks Heritage Conservancy
Magidson Conservation Easement
BRC-‐LTA-‐9-‐7
$117,400 $115,000 9 Critical Habitat Acquisition (LT)
$255,500 LT_Key
Bucks Heritage Conservancy
Martins Creek Buffer Restoration
BRC-‐RCI-‐17-‐164
$16,681 $14,100 17 Implementation (RIV)
$33,362 RIVER_Key
Bucks Heritage Conservancy
Mulligan Conservation Easement
KEY-‐LTA-‐1-‐3 $35,000 $35,000 1 Open Space Acquisition (LT)
$90,000 LT_Key
Bucks Heritage Conservancy
Neis Conservation Easement
BRC-‐LTA-‐11.5-‐2
$202,000 $200,000 11.5 Open Space Acquisition (LT)
$404,000 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 103 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Bucks Heritage Conservancy
Phelps Property/Quakertown Swamp
BRC-‐LTA-‐7-‐10
$130,050 $130,000 7 Open Space Acquisition (LT)
$295,000 LT_Key
Bucks Heritage Conservancy
Quakertown Swamp KEY-‐LTP-‐4-‐8 $7,500 $7,500 4 Open Space Planning (LT)
$15,000 LT_Key
Bucks Heritage Conservancy
Rattlesnake and Mine Hill Wildlife Easement
BRC-‐LTA-‐15-‐117
$244,000 $244,000 15 Open Space Acquisition (LT)
$488,000 LT_Key
Bucks Heritage Conservancy
Romano Property BRC-‐LTA-‐6-‐12
$70,587 $70,000 6 Critical Habitat Acquisition (LT)
$157,000 LT_Key
Bucks Heritage Conservancy
Skoriak Property (Cooks Creek)
BRC-‐LTA-‐9-‐8
$65,000 $65,000 9 Critical Habitat Acquisition (LT)
$147,100 LT_Key
Bucks Heritage Conservancy
Skoriak Property Conservation Easement
BRC-‐LTA-‐16-‐31
$91,650 $91,600 16 Critical Habitat Acquisition (LT)
$183,300 LT_Key
Bucks Heritage Conservancy
Snider Property Conservation Easement
BRC-‐LTA-‐16-‐30
$191,900 $191,000 16 Critical Habitat Acquisition (LT)
$383,800 LT_Key
Bucks Hilltown Township Pedestrian/Bike Path KEY-‐PRD-‐5-‐88
$65,000 $65,000 5 Park Rehabilitation and Development (COMM)
$130,000 COMM_Key
Bucks Hulmeville Borough Borough Park KEY-‐SC-‐2-‐65 $20,000 $20,000 2 Small Communities/Small Projects (COMM)
$45,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 104 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Bucks Langhorne Borough Mayor's Playground KEY-‐SC-‐3-‐107
$20,000 $20,000 3 Small Communities/Small Projects (COMM)
$32,900 COMM_Key
Bucks Langhorne Borough Roach Property Acquisition
BRC-‐ACQ-‐9-‐110
$440,000 $440,000 9 Acquisition (COMM)
$880,000 COMM_Key
Bucks Lower Makefield Township
Vargo Tract KEY-‐ACQ-‐2-‐87
$175,000 $175,000 2 Acquisition (COMM)
$1,555,800 COMM_Key
Bucks Lower Southampton Township
Comp. Rec., Park & Open Space Plan
KEY-‐TAG-‐3-‐120
$12,500 $12,500 3 Comp. Rec., Park, & Open Space Plans (COMM)
$25,000 COMM_Key
Bucks Lower Southampton Township
Ferderbar Pool BRC-‐PRD-‐7-‐107
$60,000 $60,000 7 Park Rehabilitation and Development (COMM)
$120,000 COMM_Key
Bucks Middletown Township
Beachwood & Veterans Parks Master Plans
BRC-‐TAG-‐12-‐250
$28,000 $28,000 12 Master Site Plans (COMM)
$56,000 COMM_Key
Bucks Middletown Township
Beechwood Park-‐Development
BRC-‐PRD-‐15-‐60
$200,000 $180,000 15 Park Rehabilitation and Development (COMM)
$1,396,000 COMM_Key
Bucks Middletown Township
Comp. Rec, Parks, Open Space & Greenway Pl
BRC-‐TAG-‐9-‐134
$30,200 $30,000 9 Comp. Rec., Park, & Open Space Plans (COMM)
$60,400 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 105 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Bucks Middletown Township
Middletown Park KEY-‐PRD-‐1-‐85
$200,000 $100,000 1 Park Rehabilitation and Development (COMM)
$2,216,000 COMM_Key
Bucks Middletown Township
Parcel 66 KEY-‐ACQ-‐5-‐130
$200,000 $200,000 5 Acquisition (COMM)
$800,000 COMM_Key
Bucks Middletown Township
Styer Pavilion Project BRC-‐PRD-‐8-‐118
$74,400 $74,000 8 Park Rehabilitation and Development (COMM)
$148,800 COMM_Key
Bucks Milford Township Camp Cedar Hill Acquisition
BRC-ACQ-19-11
$106,444.85 $106,000.00 19 Acquisition (COMM)
$212,890.00 COMM_Key
Bucks Milford Township Camp Cedar Hill Acquisition
BRC-ACQ-19-11
$106,444.85 $106,000.00 19 Acquisition (COMM)
$212,890.00 COMM_Key
Bucks Milford Township Camp Cedar Hill Acquisition
BRC-ACQ-19-11
$106,444.85 $106,000.00 19 Acquisition (COMM)
$212,890.00 COMM_Key
Bucks Milford Township Comprehensive Recreation, Park and Open Space Plan
BRC-‐TAG-‐7-‐130
$18,750 $18,000 7 Comp. Rec., Park, & Open Space Plans (COMM)
$37,500 COMM_Key
Bucks Morrisville Borough Manor Park South KEY-‐PRD-‐1-‐89
$40,000 $40,000 1 Park Rehabilitation and Development (COMM)
$82,000 COMM_Key
Bucks Natural Lands Trust, Inc.
Jahnke Property Acquisition
BRC-‐LTA-‐12-‐18
$370,000 $370,000 12 Open Space Acquisition (LT)
$740,000 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 106 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Bucks Natural Lands Trust, Inc.
Matczak Property BRC-‐LTA-‐7-‐14
$176,650 $225,000 7 Critical Habitat Acquisition (LT)
$450,000 LT_Key
Bucks Natural Lands Trust, Inc.
Neshaminy Addition BRC-‐LTA-‐6-‐17
$75,000 $50,000 6 Critical Habitat Acquisition (LT)
$150,000 LT_Key
Bucks New Britain Township
West Branch Park Master Site Plan
BRC-‐TAG-‐12-‐255
$33,000 $33,000 12 Master Site Plans (COMM)
$66,000 COMM_Key
Bucks New Britain Township
West Branch Park-‐ Phase I-‐ Development
BRC-‐PRD-‐16-‐149
$223,560 $197,400 16 Park Rehabilitation and Development (COMM)
$447,120 COMM_Key
Bucks New Hope Borough Ferry Street Park Development
BRC-‐PRD-‐12-‐176
$120,000 $120,000 12 Park Rehabilitation and Development (COMM)
$262,000 COMM_Key
Bucks Newtown Borough Linton Memorial Park
KEY-‐SC-‐5-‐148
$20,000 $20,000 5 Small Communities/Small Projects (COMM)
$54,800 COMM_Key
Bucks Newtown Borough Newtown Creek Watershed Conservation Plan
BRC-‐RCP-‐14-‐286
$12,100 $12,100 14 Planning (RIV) $24,200 RIVER_Key
Bucks Newtown Township Multi-‐park Master Site Plan
KEY-‐TAG-‐4-‐114
$20,000 $20,000 4 Master Site Plans (COMM)
$40,000 COMM_Key
Bucks Newtown Township Nature Preserve KEY-‐ACQ-‐4-‐115
$100,000 $100,000 4 Acquisition (COMM)
$1,102,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 107 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Bucks Northampton Township Civic Center 1 Recreation Complex- Phase 1- Development
BRC-PRD-19-208
$250,000.00 $250,000.00 19 Park Rehabilitation and Development (COMM)
$876,600.00 COMM_Key
Bucks Northampton Township Civic Center 1 Recreation Complex- Phase 1- Development
BRC-PRD-19-208
$250,000.00 $250,000.00 19 Park Rehabilitation and Development (COMM)
$876,600.00 COMM_Key
Bucks Northampton Township Civic Center 1 Recreation Complex- Phase 1- Development
BRC-PRD-19-208
$250,000.00 $250,000.00 19 Park Rehabilitation and Development (COMM)
$876,600.00 COMM_Key
Bucks Northampton Township
Comprehensive Rec., Park & Open Space Pl
KEY-‐TAG-‐3-‐159
$12,500 $12,500 3 Comp. Rec., Park, & Open Space Plans (COMM)
$25,000 COMM_Key
Bucks Northampton Township
Comprehensive Recreation and Park Plan
BRC-‐TAG-‐16-‐66
$22,500 $22,500 16 Comp. Rec., Park, & Open Space Plans (COMM)
$45,000 COMM_Key
Bucks Partnership for Land Use Management
Paunacussing Creek Watershed Plan
BRC-‐RCP-‐6-‐4
$23,000 $23,000 6 Planning (RIV) $51,700 RIVER_Key
Bucks Penndel Borough Memorial Field Recreation Complex -‐Phase-‐2-‐ -‐ Development
BRC-‐PRD-‐18-‐89
$125,000 $125,000 18 Park Rehabilitation and Development (COMM)
$250,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 108 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Bucks Penndel Borough Penndel Recreation Field
BRC-‐SC-‐6-‐141
$19,600 $19,600 6 Small Communities/Small Projects (COMM)
$19,600 COMM_Key
Bucks Perkasie Borough Lenape Park Expansion
KEY-‐ACQ-‐3-‐167
$19,500 $10,000 3 Acquisition (COMM)
$39,000 COMM_Key
Bucks Perkasie Borough Lenape Park Expansion-‐Phase One
BRC-‐PRD-‐8-‐151
$301,400 $150,000 8 Park Rehabilitation and Development (COMM)
$627,900 COMM_Key
Bucks Perkasie Borough Perkiomen Bike Path KEY-‐PRD-‐2-‐118
$138,600 $125,000 2 Park Rehabilitation and Development (COMM)
$277,200 COMM_Key
Bucks Plumstead Township Community Park KEY-‐ACQ-‐3-‐178
$100,000 $100,000 3 Acquisition (COMM)
$200,000 COMM_Key
Bucks Plumstead Township Owls Nest Park -‐Development
BRC-‐PRD-‐18-‐93
$281,900 $280,000 18 Park Rehabilitation and Development (COMM)
$563,800 COMM_Key
Bucks Quakertown Borough Krupp Park- Phase 2- Development
BRC-PRD-19-106
$250,000.00 $250,000.00 19 Park Rehabilitation and Development (COMM)
$550,000.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 109 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Bucks Quakertown Borough Krupp Park- Phase 2- Development
BRC-PRD-19-106
$250,000.00 $250,000.00 19 Park Rehabilitation and Development (COMM)
$550,000.00 COMM_Key
Bucks Quakertown Borough Krupp Park- Phase 2- Development
BRC-PRD-19-106
$250,000.00 $250,000.00 19 Park Rehabilitation and Development (COMM)
$550,000.00 COMM_Key
Bucks Redevelopment Authority of the County of Bucks
Bristol Waterfront Feasibility Study and Master Site Plan
BRC-‐TAG-‐13.3-‐487
$78,650 $60,000 13.3 Feasibility Studies (COMM)
$157,300 RIVER_Key
Bucks Redevelopment Authority of the County of Bucks
East Coast Greenway Neshaminy Creek Crossing Project
BRC-‐TAG-‐16-‐82
$35,000 $29,600 16 Greenway Plans (COMM)
$70,000 COMM_Key
Bucks Richland Township Upper Tohickon Watershed Conservation Plan
BRC-‐RCP-‐8-‐6
$75,000 $50,000 8 Planning (RIV) $150,000 RIVER_Key
Bucks Richlandtown Borough
Benner Hall Park-‐-‐Development
BRC-‐PRD-‐16-‐157
$344,495 $250,000 16 Park Rehabilitation and Development (COMM)
$689,495 COMM_Key
Bucks Richlandtown Borough
Benner Memorial Park-‐ Development
BRC-‐SC-‐18-‐40
$31,833 $31,800 18 Small Communities/Small Projects (COMM)
$43,665 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 110 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Bucks Riegelsville Borough Borough Park KEY-‐SC-‐3-‐186
$20,000 $20,000 3 Small Communities/Small Projects (COMM)
$26,000 COMM_Key
Bucks Riegelsville Borough Comp. Rec., Park, Open Space & Master Site Plans
BRC-‐TAG-‐14-‐239
$19,500 $19,500 14 Comp. Rec., Park, & Open Space Plans (COMM)
$39,500 COMM_Key
Bucks Sellersville Borough Streambank Rehabilitation and Wall Repair
BRC-‐RCD-‐18-‐165
$69,064 $64,200 18 Development (RIV)
$138,128 COMM_Key
Bucks Solebury Township Laurel Road Park BRC-‐PRD-‐13-‐143
$250,000 $250,000 13 Park Rehabilitation and Development (COMM)
$1,691,900 COMM_Key
Bucks Telford Borough Telford Municipal Park - Development
BRC-PRD-19-120
$250,000.00 $250,000.00 19 Park Rehabilitation and Development (COMM)
$708,204.00 COMM_Key
Bucks Telford Borough Telford Municipal Park - Development
BRC-PRD-19-120
$250,000.00 $250,000.00 19 Park Rehabilitation and Development (COMM)
$708,204.00 COMM_Key
Bucks Telford Borough Telford Municipal Park - Development
BRC-PRD-19-120
$250,000.00 $250,000.00 19 Park Rehabilitation and Development (COMM)
$708,204.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 111 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Bucks The Tinicum Conservancy
Tohickon Creek Greenway & Watershed Plan
BRC-‐RCP-‐6-‐3
$36,000 $39,500 6 Planning (RIV) $54,000 RIVER_Key
Bucks Tinicum Township Camp Onas Conservation Easement
BRC-‐ACQ-‐9-‐208
$140,000 $90,000 9 Acquisition (COMM)
$287,000 COMM_Key
Bucks Tinicum Township Tinicum Creek Watershed Cons. Plan
KEY-‐RCP-‐95-‐03
$25,000 $25,000 1 Planning (RIV) $55,900 RIVER_Key
Bucks Tinicum Township Tinicum Township Park Master Site Plan
BRC-‐TAG-‐18-‐151
$15,000 $15,000 18 Master Site Plans (COMM)
$30,000 COMM_Key
Bucks Upper Makefield Township
Bowman's Tower Park
KEY-‐PRD-‐1-‐140
$89,647 $89,600 1 Park Rehabilitation and Development (COMM)
$179,295 COMM_Key
Bucks Upper Makefield Township
Brownsburg and Lookout Parks
BRC-‐PRD-‐10-‐140
$250,000 $200,000 10 Park Rehabilitation and Development (COMM)
$1,194,530 COMM_Key
Bucks Upper Makefield Township
Brownsburg Park BRC-‐TAG-‐8-‐200
$16,500 $16,000 8 Master Site Plans (COMM)
$33,000 COMM_Key
Bucks Upper Makefield Township
Washington Crossing Gateway Park
BRC-‐PRD-‐11-‐94
$160,000 $160,000 11 Park Rehabilitation and Development (COMM)
$735,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 112 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Bucks Upper Southampton Township
Byberry Realty Property Acquisition
BRC-‐ACQ-‐8-‐203
$100,000 $100,000 8 Acquisition (COMM)
$448,000 COMM_Key
Bucks Upper Southampton Township
Park, Rec., & Open Space Plan
BRC-‐TAG-‐9-‐216
$30,000 $30,000 9 Comp. Rec., Park, & Open Space Plans (COMM)
$60,000 COMM_Key
Bucks Upper Southampton Township
Peer-‐to-‐Peer BRC-‐TAG-‐6-‐6
$5,000 $5,000 6 Peer-‐to-‐Peer Tech. Assistance (COMM)
$5,500 COMM_Key
Bucks Upper Southampton Township
Recreation Center KEY-‐PRD-‐2-‐160
$100,000 $50,000 2 Park Rehabilitation and Development (COMM)
$286,400 COMM_Key
Bucks Warminster Township
Community Park BRC-‐PRD-‐13-‐152
$150,000 $100,000 13 Park Rehabilitation and Development (COMM)
$300,000 COMM_Key
Bucks Warminster Township
NAWC-‐AD Master Site Plan
BRC-‐TAG-‐6-‐187
$30,000 $30,000 6 Master Site Plans (COMM)
$60,000 COMM_Key
Bucks Warrington Township
Bradford Reservoir Trail
BRC-‐PRD-‐13.3-‐442
$206,250 $200,000 13.3 Park Rehabilitation and Development (COMM)
$412,500 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 113 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Bucks Warrington Township
Lower Nike Site KEY-‐PRD-‐1-‐143
$57,250 $57,200 1 Park Rehabilitation and Development (COMM)
$114,500 COMM_Key
Bucks Warrington Township
Mews Park KEY-‐PRD-‐2-‐163
$54,324 $50,000 2 Park Rehabilitation and Development (COMM)
$108,648 COMM_Key
Bucks Warrington Township
Trail System Plan BRC-‐TAG-‐9-‐221
$40,000 $40,000 9 Trail Study (COMM)
$80,000 COMM_Key
Bucks Warwick Township Moland Park KEY-‐ACQ-‐2-‐164
$433,386 $175,000 2 Acquisition (COMM)
$866,773 COMM_Key
Bucks Warwick Township Warwick Community Park
KEY-‐PRD-‐5-‐212
$52,500 $52,500 5 Park Rehabilitation and Development (COMM)
$130,000 COMM_Key
Bucks Warwick Township Warwick Township CRPOS Plan
BRC-‐TAG-‐11-‐237
$15,000 $15,000 11 Comp. Rec., Park, & Open Space Plans (COMM)
$30,000 COMM_Key
Bucks West Rockhill Township
James Memorial Park
KEY-‐SC-‐3-‐235
$12,600 $12,600 3 Small Communities/Small Projects (COMM)
$15,600 COMM_Key
Bucks Wildlands Conservancy, Inc.
Washington Crossing Tract
KEY-‐LTA-‐5-‐24
$800,000 $750,000 5 Open Space Acquisition (LT)
$2,414,600 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 114 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Bucks Wrightstown Township
Anchor Run Park BRC-‐SC-‐9-‐235
$40,000 $20,000 9 Small Communities/Small Projects (COMM)
$71,000 COMM_Key
Bucks Wrightstown Township
Open Space Preserve BRC-‐TAG-‐6-‐203
$10,000 $10,000 6 Master Site Plans (COMM)
$20,000 COMM_Key
Bucks Yardley Borough Buttonwood Park, Phases II & III
BRC-‐PRD-‐8-‐223
$203,000 $100,000 8 Park Rehabilitation and Development (COMM)
$407,300 COMM_Key
Bucks Yardley Borough Lake Afton to Veteran’s Memorial Park Trail -‐ Development
BRC-‐PRD-‐17-‐162
$112,000 $80,000 17 Park Rehabilitation and Development (COMM)
$1,085,500 COMM_Key
Bucks Yardley Borough Yardley Pedestrian Plaza
KEY-‐PRD-‐5-‐229
$75,000 $75,000 5 Park Rehabilitation and Development (COMM)
$150,000 COMM_Key
Bucks, Delaware, Philadelphia
Pennsylvania Environmental Council, Inc.
Tidal Delaware Water Trail Implementation 2012
BRC-‐RCI-‐17-‐165
$20,000 $20,000 17 Implementation (RIV)
$45,590 RIVER_Key
Bucks, Monroe, Northampton, Pike, Wayne
Delaware River Greenway Partnership
Delaware River Water Trail Implementation Phase 2
BRC-‐RCI-‐13-‐13
$45,000 $45,000 13 Implementation (RIV)
$90,000 RIVER_Key
Keystone Fund Projects by County (1994-‐2013)
Page 115 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Bucks, Montgomery
Heritage Conservancy
Riparian Buffer Assessment Update for Southeastern PA
BRC-‐RCI-‐16-‐176
$20,284 $13,700 16 Implementation (RIV)
$57,576 RIVER_Key
Bucks, Montgomery, Philadelphia
Philadelphia Water Department
River Conservation Plan -‐ Poquessing Creek
BRC-‐RCP-‐10-‐9
$100,000 $75,000 10 Planning (RIV) $210,197 RIVER_Key
Bucks, Northampton
Heritage Conservancy
Seifert-‐Ray Property Conservation Easement
BRC-‐LTA-‐12-‐19
$215,600 $215,000 12 Open Space Acquisition (LT)
$469,000 LT_Key
Bucks, Northampton
Heritage Conservancy
Watershed-‐based Internet Mapping for Cooks Creek
BRC-‐RCI-‐9-‐9 $24,700 $20,000 9 Implementation (RIV)
$49,500 RIVER_Key
Bucks, Philadelphia
Pennsylvania Environmental Council, Inc.
Tidal Delaware Stewardship Plan
BRC-TAG-19-141
$124,960.00 $100,000.00 19 Conservation/Sound Land Use (COMM)
$249,960.00 LT_Key
Bucks, Philadelphia
Pennsylvania Environmental Council, Inc.
Tidal Delaware Stewardship Plan
BRC-TAG-19-141
$124,960.00 $100,000.00 19 Conservation/Sound Land Use (COMM)
$249,960.00 LT_Key
Bucks, Philadelphia
Pennsylvania Environmental Council, Inc.
Tidal Delaware Stewardship Plan
BRC-TAG-19-141
$124,960.00 $100,000.00 19 Conservation/Sound Land Use (COMM)
$249,960.00 LT_Key
Bucks, Philadelphia
Pennsylvania Environmental Council, Inc.
Tidal Delaware Stewardship Plan
BRC-TAG-19-141
$124,960.00 $100,000.00 19 Conservation/Sound Land Use (COMM)
$249,960.00 LT_Key
Bucks, Philadelphia
Pennsylvania Environmental Council, Inc.
Tidal Delaware Stewardship Plan
BRC-TAG-19-141
$124,960.00 $100,000.00 19 Conservation/Sound Land Use (COMM)
$249,960.00 LT_Key
Bucks, Philadelphia
Pennsylvania Environmental Council, Inc.
Tidal Delaware Stewardship Plan
BRC-TAG-19-141
$124,960.00 $100,000.00 19 Conservation/Sound Land Use (COMM)
$249,960.00 LT_Key
Bucks, Philadelphia
Pennsylvania Environmental Council, Inc.
Tidal Delaware Stewardship Plan
BRC-TAG-19-141
$124,960.00 $100,000.00 19 Conservation/Sound Land Use (COMM)
$249,960.00 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 116 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Butler Adams Township Community Park KEY-‐ACQ-‐3-‐5
$112,500 $100,000 3 Acquisition (COMM)
$225,000 COMM_Key
Butler Adams Township Community Park KEY-‐PRD-‐5-‐3
$100,000 $100,000 5 Park Rehabilitation and Development (COMM)
$225,000 COMM_Key
Butler Adams Township Community Park -‐ Phase I
KEY-‐PRD-‐4-‐5
$150,000 $100,000 4 Park Rehabilitation and Development (COMM)
$359,750 COMM_Key
Butler Adams Township Comp Rec & Pk Plan BRC-‐TAG-‐11-‐190
$45,000 $45,000 11 Comp. Rec., Park, & Open Space Plans (COMM)
$90,000 COMM_Key
Butler Bruin Borough Community Park BRC-‐SC-‐6-‐26
$20,000 $20,000 6 Small Communities/Small Projects (COMM)
$23,000 COMM_Key
Butler Buffalo Township Butler-‐Freeport Community Trail
KEY-‐RTD-‐4-‐7
$27,100 $27,100 4 Rail Rehabilitation and Development (RT)
$54,200 RT_Key
Butler Buffalo Township Butler/Freeport Community Trail Development
BRC-‐PRD-‐14-‐370
$250,000 $195,000 14 Park Rehabilitation and Development (COMM)
$555,600 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 117 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Butler Buffalo Township Ford Property Acquisition
BRC-‐ACQ-‐16-‐20
$90,000 $90,000 16 Acquisition (COMM)
$180,000 COMM_Key
Butler Butler City Butler Rotary Park Trail -‐ Development
BRC-‐PRD-‐16-‐125
$154,000 $154,000 16 Park Rehabilitation and Development (COMM)
$309,520 COMM_Key
Butler Butler City Comp Rec, Park & Open Space Plan, Master Site Plan
BRC-‐TAG-‐8-‐30
$30,000 $30,000 8 Comp. Rec., Park, & Open Space Plans (COMM)
$70,000 COMM_Key
Butler Butler County Alameda County Park -‐ Phase 3 -‐ Development
BRC-‐PRD-‐17-‐109
$125,000 $125,000 17 Park Rehabilitation and Development (COMM)
$250,000 COMM_Key
Butler Butler County Alameda Park -‐ Pool Renovation
KEY-‐PRD-‐3-‐29
$260,000 $250,000 3 Park Rehabilitation and Development (COMM)
$540,700 COMM_Key
Butler Butler County Alameda Park-Development
BRC-PRD-19-63
$400,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)
$900,000.00 COMM_Key
Butler Butler County Alameda Park-Development
BRC-PRD-19-63
$400,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)
$900,000.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 118 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Butler Butler County Alameda Park-Development
BRC-PRD-19-63
$400,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)
$900,000.00 COMM_Key
Butler Butler County Alameda Park-Development
BRC-PRD-19-63
$400,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)
$900,000.00 COMM_Key
Butler Butler County Alameda Park-Development
BRC-PRD-19-63
$400,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)
$900,000.00 COMM_Key
Butler Butler County Alameda Park-Development
BRC-PRD-19-63
$400,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)
$900,000.00 COMM_Key
Butler Butler County Alameda Park-Development
BRC-PRD-19-63
$400,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)
$900,000.00 COMM_Key
Butler Butler County Alameda Park-Development
BRC-PRD-19-63
$400,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)
$900,000.00 COMM_Key
Butler Butler County Alameda Park-Development
BRC-PRD-19-63
$400,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)
$900,000.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 119 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Butler Butler County Alameda Park-Development
BRC-PRD-19-63
$400,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)
$900,000.00 COMM_Key
Butler Butler County Butler County & Cranberry Township Recreation Planning
BRC-‐TAG-‐15-‐87
$125,000 $142,500 15 Comp. Rec., Park, & Open Space Plans (COMM)
$250,000 COMM_Key
Butler Butler County Community College Park
BRC-‐PRD-‐6-‐27
$150,000 $100,000 6 Park Rehabilitation and Development (COMM)
$390,000 COMM_Key
Butler Butler County Comprehensive Recreation & Park Plan
KEY-‐TAG-‐1-‐25
$50,000 $50,000 1 Comp. Rec., Park, & Open Space Plans (COMM)
$100,000 COMM_Key
Butler Butler County Conduit Grant BRC-‐PRD-‐7-‐29
$100,000 $100,000 7 Park Rehabilitation and Development (COMM)
$131,600 COMM_Key
Butler Butler County Diamond Park KEY-‐PRD-‐4-‐22
$90,000 $90,000 4 Park Rehabilitation and Development (COMM)
$204,200 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 120 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Butler Butler County Special Kids Zone Playground
BRC-‐PRD-‐11-‐14
$100,000 $50,000 11 Park Rehabilitation and Development (COMM)
$330,000 COMM_Key
Butler Butler Township Duffy Road Park BRC-‐PRD-‐11-‐15
$97,700 $97,700 11 Park Rehabilitation and Development (COMM)
$195,300 COMM_Key
Butler Butler Township Master Site Plans for Preston & Butler Township Parks
BRC-‐TAG-‐17-‐4
$30,000 $30,000 17 Master Site Plans (COMM)
$60,000 COMM_Key
Butler Butler Township Multi-‐Municipal CRPP
BRC-‐TAG-‐13.3-‐461
$61,400 $61,400 13.3 Comp. Rec., Park, & Open Space Plans (COMM)
$122,800 COMM_Key
Butler Center Township Township Park BRC-‐PRD-‐13-‐348
$20,000 $20,000 13 Park Rehabilitation and Development (COMM)
$40,000 COMM_Key
Butler Chicora Borough Community Park BRC-‐SC-‐13-‐293
$28,000 $27,000 13 Small Communities/Small Projects (COMM)
$35,000 COMM_Key
Butler Clay Township Community Park -‐ Development
BRC-‐SC-‐17-‐31
$32,000 $32,000 17 Small Communities/Small Projects (COMM)
$44,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 121 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Butler Clay Township Township Park KEY-‐SC-‐2-‐29 $20,000 $20,000 2 Small Communities/Small Projects (COMM)
$23,000 COMM_Key
Butler Clearfield Township Clearfield Elementary Park
KEY-‐SC-‐2-‐31 $20,000 $20,000 2 Small Communities/Small Projects (COMM)
$23,100 COMM_Key
Butler Clinton Township Clinton & Buffalo Twps Greenway/Mini Comp Plan
BRC-‐TAG-‐12-‐231
$46,000 $46,000 12 Greenway Plans (COMM)
$93,100 COMM_Key
Butler Clinton Township Spring Valley Park BRC-‐PRD-‐11-‐20
$189,300 $100,000 11 Park Rehabilitation and Development (COMM)
$385,600 COMM_Key
Butler Clinton Township Spring Valley Park BRC-‐TAG-‐9-‐52
$15,000 $15,000 9 Master Site Plans (COMM)
$30,000 COMM_Key
Butler Connoquenessing Borough
Community Park KEY-‐SC-‐3-‐40 $20,000 $20,000 3 Small Communities/Small Projects (COMM)
$22,200 COMM_Key
Butler Cranberry Township Brush Creek Trail Phase 1 -‐ Graham Park Trail Extension -‐ Development
BRC-‐PRD-‐18-‐173
$144,788 $90,000 18 Park Rehabilitation and Development (COMM)
$180,986 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 122 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Butler Cranberry Township Cranberry Community Park
BRC-‐PRD-‐6-‐45
$153,300 $70,000 6 Park Rehabilitation and Development (COMM)
$306,600 COMM_Key
Butler Cranberry Township Township Pool KEY-‐PRD-‐2-‐33
$200,000 $200,000 2 Park Rehabilitation and Development (COMM)
$1,295,000 COMM_Key
Butler East Butler Borough Brandon and Firehall Parks-‐ Development
BRC-‐SC-‐18-‐29
$32,000 $32,000 18 Small Communities/Small Projects (COMM)
$44,000 COMM_Key
Butler East Butler Borough East Butler Park KEY-‐SC-‐1-‐40 $20,000 $20,000 1 Small Communities/Small Projects (COMM)
$21,630 COMM_Key
Butler Eau Claire Borough Community Park -‐ Development
BRC-‐SC-‐17-‐33
$28,000 $28,000 17 Small Communities/Small Projects (COMM)
$36,000 COMM_Key
Butler Eau Claire Borough Eau Claire Community Park Acquisition
BRC-‐ACQ-‐10-‐180
$11,000 $11,000 10 Acquisition (COMM)
$22,000 COMM_Key
Butler Evans City Borough Community Park KEY-‐SC-‐5-‐64 $20,000 $20,000 5 Small Communities/Small Projects (COMM)
$23,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 123 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Butler Fairview Borough Borough Park BRC-‐SC-‐14-‐83
$28,000 $28,000 14 Small Communities/Small Projects (COMM)
$36,000 COMM_Key
Butler Fairview Borough Playground Rehab BRC-‐SC-‐11-‐122
$27,000 $27,000 11 Small Communities/Small Projects (COMM)
$34,000 COMM_Key
Butler Fairview Township Fairview Township Community Park
BRC-‐SC-‐10-‐77
$40,000 $40,000 10 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Butler Harmony Borough Eichenauer Property KEY-‐ACQ-‐5-‐81
$16,000 $16,000 5 Acquisition (COMM)
$32,000 COMM_Key
Butler Harrisville Borough Community Park KEY-‐SC-‐1-‐57 $20,000 $20,000 1 Small Communities/Small Projects (COMM)
$23,350 COMM_Key
Butler Harrisville Borough Community Park -‐ Phase II
BRC-‐SC-‐14-‐89
$26,000 $26,000 14 Small Communities/Small Projects (COMM)
$32,000 COMM_Key
Butler Harrisville Borough Harrisville Community Park
BRC-‐SC-‐9-‐89
$27,000 $27,000 9 Small Communities/Small Projects (COMM)
$34,000 COMM_Key
Butler Jefferson Township Doerr Park Master Site Development Plan
BRC-‐TAG-‐11-‐213
$15,000 $15,000 11 Master Site Plans (COMM)
$30,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 124 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Butler Jefferson Township Laura Doerr Memorial Park Pool
BRC-‐PRD-‐13-‐110
$75,000 $75,000 13 Park Rehabilitation and Development (COMM)
$150,000 COMM_Key
Butler Jefferson Township Laura J. Doerr Memerial Park-Development
BRC-PRD-19-86
$95,000.00 $95,000.00 19 Park Rehabilitation and Development (COMM)
$200,000.00 COMM_Key
Butler Jefferson Township Laura J. Doerr Memerial Park-Development
BRC-PRD-19-86
$95,000.00 $95,000.00 19 Park Rehabilitation and Development (COMM)
$200,000.00 COMM_Key
Butler Jefferson Township Laura J. Doerr Memerial Park-Development
BRC-PRD-19-86
$95,000.00 $95,000.00 19 Park Rehabilitation and Development (COMM)
$200,000.00 COMM_Key
Butler Karns City Borough McCollough Park Rehab
BRC-‐SC-‐11-‐131
$27,000 $27,000 11 Small Communities/Small Projects (COMM)
$34,000 COMM_Key
Butler Lancaster Township Lancaster Township Park Master Site Plan
BRC-‐TAG-‐18-‐147
$15,000 $15,000 18 Master Site Plans (COMM)
$30,000 COMM_Key
Butler Marion Township Community Park KEY-‐SC-‐4-‐95 $20,000 $20,000 4 Small Communities/Small Projects (COMM)
$22,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 125 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Butler Marion Township Township Park-Development
BRC-SC-19-44
$35,000.00 $35,000.00 19 Small Communities/Small Projects (COMM)
$50,000.00 COMM_Key
Butler Marion Township Township Park-Development
BRC-SC-19-44
$35,000.00 $35,000.00 19 Small Communities/Small Projects (COMM)
$50,000.00 COMM_Key
Butler Marion Township Township Park-Development
BRC-SC-19-44
$35,000.00 $35,000.00 19 Small Communities/Small Projects (COMM)
$50,000.00 COMM_Key
Butler Mars Borough Clay Avenue Park-‐ Development
BRC-‐SC-‐18-‐35
$35,000 $35,000 18 Small Communities/Small Projects (COMM)
$50,000 COMM_Key
Butler Mars Borough Garfield Playground KEY-‐SC-‐3-‐127
$20,000 $20,000 3 Small Communities/Small Projects (COMM)
$22,000 COMM_Key
Butler Mars Borough Mars Athletic Field BRC-‐PRD-‐6-‐107
$60,600 $60,000 6 Park Rehabilitation and Development (COMM)
$121,200 COMM_Key
Butler Middlesex Township Parks & Rec. Comp. & Master Site Dvlpmnt. Plans
BRC-‐TAG-‐11-‐223
$30,000 $30,000 11 Comp. Rec., Park, & Open Space Plans (COMM)
$60,000 COMM_Key
Butler Middlesex Township Tennis/Basketball Court
BRC-‐SC-‐7-‐128
$20,700 $20,000 7 Small Communities/Small Projects (COMM)
$41,400 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 126 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Butler Penn Township Hertzell Property Acquisition
BRC-‐ACQ-‐12-‐277
$237,500 $237,000 12 Acquisition (COMM)
$474,000 COMM_Key
Butler Petrolia Borough Petrolia Park KEY-‐SC-‐3-‐170
$20,000 $20,000 3 Small Communities/Small Projects (COMM)
$21,850 COMM_Key
Butler Petrolia Borough Petrolia Park-Development
BRC-SC-19-45
$28,000.00 $28,000.00 19 Small Communities/Small Projects (COMM)
$36,000.00 COMM_Key
Butler Petrolia Borough Petrolia Park-Development
BRC-SC-19-45
$28,000.00 $28,000.00 19 Small Communities/Small Projects (COMM)
$36,000.00 COMM_Key
Butler Petrolia Borough Petrolia Park-Development
BRC-SC-19-45
$28,000.00 $28,000.00 19 Small Communities/Small Projects (COMM)
$36,000.00 COMM_Key
Butler Portersville Borough Community Park KEY-‐SC-‐3-‐180
$20,000 $20,000 3 Small Communities/Small Projects (COMM)
$22,500 COMM_Key
Butler Seven Fields Borough
Nature Preserve BRC-‐SC-‐11-‐153
$33,900 $33,000 11 Small Communities/Small Projects (COMM)
$47,800 COMM_Key
Butler Slippery Rock Borough
Community Park BRC-‐SC-‐11-‐156
$40,000 $40,000 11 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 127 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Butler Slippery Rock Borough
Community Park KEY-‐SC-‐2-‐141
$19,500 $19,500 2 Small Communities/Small Projects (COMM)
$23,000 COMM_Key
Butler Slippery Rock Borough
Multi-‐municipal Comp. Rec., Park & Open Space Plan and MSDP
BRC-‐TAG-‐13-‐494
$70,000 $70,000 13 Comp. Rec., Park, & Open Space Plans (COMM)
$147,000 COMM_Key
Butler Slippery Rock Borough
Multi-‐Purpose Athletic Fields
BRC-‐SC-‐9-‐189
$40,000 $40,000 9 Small Communities/Small Projects (COMM)
$61,600 COMM_Key
Butler Winfield Township Community Park-‐Development
BRC-‐SC-‐16-‐51
$40,000 $40,000 16 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Butler Winfield Township Master Site Development Plan
KEY-‐TAG-‐3-‐242
$12,500 $12,500 3 Master Site Plans (COMM)
$25,000 COMM_Key
Butler Winfield Township Winfield Community Park
BRC-‐SC-‐12-‐129
$40,000 $40,000 12 Small Communities/Small Projects (COMM)
$65,900 COMM_Key
Butler Winfield Township Winfield Township Community Park-Development
BRC-SC-19-56
$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)
$60,000.00 COMM_Key
Butler Winfield Township Winfield Township Community Park-Development
BRC-SC-19-56
$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)
$60,000.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 128 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Butler Winfield Township Winfield Township Community Park-Development
BRC-SC-19-56
$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)
$60,000.00 COMM_Key
Butler Zelienople Borough Zelienople Community Park Master Plan
BRC-‐TAG-‐12-‐268
$26,000 $26,000 12 Master Site Plans (COMM)
$52,000 COMM_Key
Butler, Montgomery
Mars Borough Garfield Playground BRC-‐SC-‐7-‐120
$30,000 $30,000 7 Small Communities/Small Projects (COMM)
$42,800 COMM_Key
Cambria Adams Township-‐Croyle Township Recreation Authority
Park of 1889 Development
BRC-‐PRD-‐12-‐130
$60,000 $60,000 12 Park Rehabilitation and Development (COMM)
$120,700 COMM_Key
Cambria Ashville Borough Ashville Park KEY-‐SC-‐5-‐8 $20,000 $20,000 5 Small Communities/Small Projects (COMM)
$22,025 COMM_Key
Cambria Blacklick Township Community Park (aka) Veteran's Memorial Park
BRC-‐PRD-‐13-‐91
$186,300 $125,000 13 Park Rehabilitation and Development (COMM)
$372,600 COMM_Key
Cambria Blacklick Township Municipal Park Master Plan
BRC-‐TAG-‐9-‐22
$10,000 $7,500 9 Master Site Plans (COMM)
$20,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 129 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Cambria Cambria County Duman Lake County Park
BRC-‐PRD-‐6-‐28
$97,100 $90,000 6 Park Rehabilitation and Development (COMM)
$194,200 COMM_Key
Cambria Cambria County Conservation and Recreation Authority
Cambria & Indiana (C and I) /Ghost Town Trail Net.
BRC-‐RTD-‐6-‐3
$210,000 $100,000 6 Rail Rehabilitation and Development (RT)
$1,525,000 RT_Key
Cambria Cambria County Conservation and Recreation Authority
Circuit Rider -‐ Year 2 KEY-‐TAG-‐4-‐23
$24,300 $24,300 4 Circuit Rider (COMM)
$31,800 COMM_Key
Cambria Cambria County Conservation and Recreation Authority
Path of the Flood Trail
BRC-‐PRD-‐10-‐4
$310,000 $150,000 10 Park Rehabilitation and Development (COMM)
$3,551,100 COMM_Key
Cambria Cambria County Conservation and Recreation Authority
Rails-‐to-‐Trails Special Study/Greenway
KEY-‐TAG-‐1-‐27
$24,800 $24,800 1 Feasibility Studies (COMM)
$49,600 COMM_Key
Cambria Cambria County Conservation and Recreation Authority
Regional Conservation Specialist
KEY-‐TAG-‐3-‐31
$30,000 $30,000 3 Circuit Rider (COMM)
$30,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 130 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Cambria Cambria County Redevelopment Authority
Conduit Grant BRC-‐PRD-‐12-‐133
$115,000 $115,000 12 Park Rehabilitation and Development (COMM)
$170,000 COMM_Key
Cambria Cambria County Redevelopment Authority
Conduit Grant BRC-‐PRD-‐7-‐32
$100,000 $100,000 7 Park Rehabilitation and Development (COMM)
$100,000 COMM_Key
Cambria Cambria County Redevelopment Authority
County Playground Safety Audit & Inspection
BRC-‐TAG-‐8-‐33
$18,000 $10,000 8 Education and Training (COMM)
$20,000 COMM_Key
Cambria Cambria County Redevelopment Authority
Demonstration Playground Conduit Grant
BRC-‐PRD-‐9-‐174
$90,000 $90,000 9 Park Rehabilitation and Development (COMM)
$100,000 COMM_Key
Cambria Cambria County Transit Authority
Inclined Plane KEY-‐PRD-‐1-‐28
$15,000 $15,000 1 Park Rehabilitation and Development (COMM)
$150,000 COMM_Key
Cambria Cambria Somerset Authority
Wilmore Resevoir -‐ Patrick's Road Property Acq.
BRC-‐ACQ-‐10-‐175
$61,450 $59,000 10 Acquisition (COMM)
$122,900 COMM_Key
Cambria Carrolltown Borough Stoltz Pond -‐ Development
BRC-‐SC-‐17-‐29
$36,500 $36,500 17 Small Communities/Small Projects (COMM)
$53,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 131 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Cambria Cassandra Borough Derby Park KEY-‐SC-‐3-‐33 $20,000 $20,000 3 Small Communities/Small Projects (COMM)
$28,500 COMM_Key
Cambria Conemaugh Township
Conemaugh Valley Ballfield Rehab/Soccer Install
BRC-‐SC-‐11-‐113
$39,000 $39,000 11 Small Communities/Small Projects (COMM)
$58,000 COMM_Key
Cambria Conemaugh Township
Two Sites KEY-‐SC-‐5-‐37 $20,000 $20,000 5 Small Communities/Small Projects (COMM)
$28,840 COMM_Key
Cambria Conemaugh Valley Conservancy, Inc.
Kiski-‐Conemaugh River Basin Cons Plan
KEY-‐RCP-‐96-‐14
$100,000 $238,000 3 Planning (RIV) $200,000 RIVER_Key
Cambria Conemaugh Valley Conservancy, Inc.
West Penn Trail -‐ Pedestrian Bridge
BRC-‐RTD-‐9-‐4
$303,000 $300,000 9 Rail Rehabilitation and Development (RT)
$660,000 RT_Key
Cambria Cresson Borough Keystone Avenue Playground
BRC-‐SC-‐6-‐47
$20,000 $20,000 6 Small Communities/Small Projects (COMM)
$21,000 COMM_Key
Cambria Croyle Township South Fork-‐Croyle Recreation Area
KEY-‐SC-‐3-‐44 $20,000 $20,000 3 Small Communities/Small Projects (COMM)
$27,500 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 132 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Cambria Dale Borough C. K. Leberknight Playground
KEY-‐SC-‐5-‐41 $20,000 $20,000 5 Small Communities/Small Projects (COMM)
$30,473 COMM_Key
Cambria Dean Township Township Park BRC-‐SC-‐6-‐49
$20,000 $20,000 6 Small Communities/Small Projects (COMM)
$21,500 COMM_Key
Cambria East Conemaugh Borough
Two Sites KEY-‐SC-‐5-‐53 $20,000 $20,000 5 Small Communities/Small Projects (COMM)
$20,890 COMM_Key
Cambria East Taylor Township
Mineral Point Village Playground
BRC-‐SC-‐13-‐298
$25,000 $20,000 13 Small Communities/Small Projects (COMM)
$30,000 COMM_Key
Cambria Ebensburg Borough Center Ward Playground
BRC-‐SC-‐10-‐75
$20,000 $20,000 10 Small Communities/Small Projects (COMM)
$49,170 COMM_Key
Cambria Ebensburg Borough Circuit Rider BRC-‐TAG-‐11-‐259
$7,560 $7,560 11 Circuit Rider (COMM)
$30,240 COMM_Key
Cambria Ebensburg Borough Downtown Gateway Parklet Acquisition
BRC-‐ACQ-‐13.3-‐275
$150,000 $150,000 13.3 Acquisition (COMM)
$300,000 COMM_Key
Cambria Ebensburg Borough East Ward Playground
KEY-‐SC-‐2-‐43 $20,000 $20,000 2 Small Communities/Small Projects (COMM)
$26,050 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 133 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Cambria Ebensburg Borough Ebensburg Skate Park
BRC-‐PRD-‐11-‐28
$188,400 $100,000 11 Park Rehabilitation and Development (COMM)
$376,900 COMM_Key
Cambria Ebensburg Borough Ebensburg Swimming Pool-‐Development
BRC-‐PRD-‐16-‐131
$300,000 $300,000 16 Park Rehabilitation and Development (COMM)
$1,044,850 COMM_Key
Cambria Ebensburg Borough Penn-‐Eben Park BRC-‐PRD-‐13.3-‐356
$125,000 $125,000 13.3 Park Rehabilitation and Development (COMM)
$250,000 COMM_Key
Cambria Ehrenfeld Borough Borough Park -‐ Phase I
KEY-‐SC-‐1-‐45 $20,000 $20,000 1 Small Communities/Small Projects (COMM)
$37,000 COMM_Key
Cambria Franklin Borough Franklin Ballfield KEY-‐SC-‐5-‐68 $20,000 $20,000 5 Small Communities/Small Projects (COMM)
$21,000 COMM_Key
Cambria Gallitzin Borough North Main Street Playground
BRC-‐SC-‐10-‐79
$40,000 $40,000 10 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Cambria Hastings Borough Borough Park KEY-‐SC-‐2-‐60 $18,500 $18,500 2 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 134 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Cambria Hastings Borough Peer-‐to-‐Peer KEY-‐TAG-‐1-‐153
$6,750 $4,000 1 Peer-‐to-‐Peer Tech. Assistance (COMM)
$7,522 COMM_Key
Cambria Hastings Borough Walking Trail BRC-‐RTD-‐6-‐12
$20,000 $10,000 6 Rail Rehabilitation and Development (RT)
$40,000 RT_Key
Cambria Jackson Township Comp Rec, Pk, Open Space Study
BRC-‐TAG-‐11-‐211
$25,000 $25,000 11 Comp. Rec., Park, & Open Space Plans (COMM)
$50,000 COMM_Key
Cambria Jackson Township Marhefka Land Acquisition (Leidy Park Addition)
BRC-‐ACQ-‐14-‐60
$77,000 $74,500 14 Acquisition (COMM)
$154,000 COMM_Key
Cambria Jackson Township Mitchell Park -‐ Phase I
BRC-‐PRD-‐13.3-‐546
$123,600 $123,600 13.3 Park Rehabilitation and Development (COMM)
$411,600 COMM_Key
Cambria Johnstown City Comprehensive Recreation & Park Plan
KEY-‐TAG-‐1-‐65
$20,000 $20,000 1 Comp. Rec., Park, & Open Space Plans (COMM)
$40,000 COMM_Key
Cambria Johnstown City Johnstown Greenway and Open Space Plan
BRC-‐TAG-‐12-‐238
$37,500 $37,500 12 Master Site Plans (COMM)
$75,500 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 135 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Cambria Johnstown City Multiple Sites KEY-‐PRD-‐5-‐99
$200,000 $150,000 5 Park Rehabilitation and Development (COMM)
$400,000 COMM_Key
Cambria Johnstown City Oakhurst Playground -‐ Development
BRC-‐PRD-‐17-‐127
$90,000 $90,000 17 Park Rehabilitation and Development (COMM)
$180,000 COMM_Key
Cambria Johnstown City Point Stadium BRC-‐PRD-‐13-‐111
$401,000 $150,000 13 Park Rehabilitation and Development (COMM)
$802,000 COMM_Key
Cambria Johnstown City Roxbury Park BRC-‐PRD-‐8-‐234
$73,500 $73,500 8 Park Rehabilitation and Development (COMM)
$147,000 COMM_Key
Cambria Johnstown City Somerset Street Intergenerational Park-‐ Development
BRC-‐PRD-‐16-‐141
$34,000 $34,000 16 Park Rehabilitation and Development (COMM)
$68,000 COMM_Key
Cambria Johnstown City Urban Greenway Pedestrian Bridge
BRC-‐PRD-‐11-‐48
$468,600 $141,000 11 Park Rehabilitation and Development (COMM)
$937,300 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 136 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Cambria Johnstown Redevelopment Authority
Cambria Iron & Steel Ped. Trail Footbridge Study
BRC-‐TAG-‐8-‐97
$30,000 $15,000 8 Feasibility Studies (COMM)
$60,000 COMM_Key
Cambria Johnstown Redevelopment Authority
Cambria Iron & Steel Ped. Trail Footbridge Study
BRC-‐TAG-‐8-‐97
$30,000 $30,000 8 Feasibility Studies (COMM)
$60,000 COMM_Key
Cambria Johnstown Redevelopment Authority
Johnstown Gateway Greenspace Development
BRC-‐PRD-‐12-‐161
$49,200 $74,200 12 Park Rehabilitation and Development (COMM)
$134,000 COMM_Key
Cambria Johnstown Redevelopment Authority
Johnstown Urban Greenway Trail
KEY-‐PRD-‐5-‐100
$270,000 $150,000 5 Park Rehabilitation and Development (COMM)
$540,000 COMM_Key
Cambria Johnstown Redevelopment Authority
Tech Park Riverwalk BRC-‐PRD-‐14-‐146
$250,000 $250,000 14 Park Rehabilitation and Development (COMM)
$500,000 COMM_Key
Cambria Lorain Borough Borough Park KEY-‐SC-‐4-‐86 $9,534 $10,000 4 Small Communities/Small Projects (COMM)
$9,534 COMM_Key
Cambria Loretto Borough McGuire Park -‐ Phase 1-‐Development
BRC-‐PRD-‐18-‐82
$178,399 $187,000 18 Park Rehabilitation and Development (COMM)
$365,499 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 137 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Cambria Middle Taylor Township
Benshoff Hill Park -‐ Development
BRC-‐SC-‐17-‐46
$35,000 $35,000 17 Small Communities/Small Projects (COMM)
$50,000 COMM_Key
Cambria Middle Taylor Township
Township Playground
KEY-‐SC-‐2-‐98 $14,400 $14,400 2 Small Communities/Small Projects (COMM)
$15,000 COMM_Key
Cambria Nanty Glo Borough Mayor Arthur C. Price Sr. Playground
KEY-‐SC-‐4-‐111
$20,000 $20,000 4 Small Communities/Small Projects (COMM)
$30,000 COMM_Key
Cambria Northern Cambria Borough
Swimming Pool Feasibility Study
BRC-‐TAG-‐6-‐16
$5,000 $5,000 6 Feasibility Studies (COMM)
$10,000 COMM_Key
Cambria Northern Cambria Borough
Thomas Barnes Memorial Park
BRC-‐SC-‐6-‐15
$20,000 $20,000 6 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Cambria Patton Borough Borough Park Renovation
BRC-‐SC-‐12-‐112
$40,000 $40,000 12 Small Communities/Small Projects (COMM)
$67,600 COMM_Key
Cambria Portage Borough Comp. Rec. Park & Open Space Plan; Trail Feasibility Study
BRC-‐TAG-‐16-‐70
$26,740 $15,200 16 Trail Study (COMM)
$90,990 COMM_Key
Cambria Richland Township East Hills Comp. Rec, Park & Open Space Plan
BRC-‐TAG-‐8-‐161
$17,600 $17,000 8 Comp. Rec., Park, & Open Space Plans (COMM)
$35,300 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 138 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Cambria Richland Township Feasibility Study KEY-‐TAG-‐5-‐171
$7,500 $7,500 5 Feasibility Studies (COMM)
$15,000 COMM_Key
Cambria Richland Township Luray Avenue Park BRC-‐PRD-‐11-‐74
$150,000 $150,000 11 Park Rehabilitation and Development (COMM)
$309,100 COMM_Key
Cambria Southern Alleghenies Conservancy
Little Conemaugh River Implementation Study
BRC-‐RCI-‐6-‐17
$8,400 $9,000 6 Implementation (RIV)
$16,800 RIVER_Key
Cambria Southmont Borough Community Park KEY-‐SC-‐2-‐146
$20,000 $20,000 2 Small Communities/Small Projects (COMM)
$34,250 COMM_Key
Cambria Summerhill Township
Township Park BRC-‐SC-‐6-‐176
$20,000 $20,000 6 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Cambria Tunnelhill Borough Tunnelhill Street Park
KEY-‐SC-‐4-‐152
$20,000 $20,000 4 Small Communities/Small Projects (COMM)
$25,000 COMM_Key
Cambria Upper Yoder Township
Ridge to River Trail BRC-‐RCI-‐8-‐19
$9,000 $9,000 8 Implementation (RIV)
$18,000 RIVER_Key
Cambria Vintondale Borough Community Park KEY-‐SC-‐5-‐209
$19,921 $20,000 5 Small Communities/Small Projects (COMM)
$23,921 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 139 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Cambria Western Pennsylvania Conservancy
Leslie Tract Acquisition
BRC-‐LTA-‐12-‐20
$652,500 $650,000 12 Open Space Acquisition (LT)
$1,305,000 LT_Key
Cambria Westmont Hilltop Recreation Authority
Ridge Recreation Facility
KEY-‐PRD-‐3-‐237
$48,700 $48,700 3 Park Rehabilitation and Development (COMM)
$97,400 COMM_Key
Cameron Grove Township Sinnamahoning Valley Recreation Complex Renovation
BRC-‐SC-‐12-‐99
$20,000 $20,000 12 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Cameron Rocky Mountain Elk Foundation
A. Buehler Property BRC-‐LTA-‐10-‐17
$162,100 $150,000 10 Open Space Acquisition (LT)
$324,100 LT_Key
Cameron, Clarion, Clearfield, Clinton, Elk, Forest, Jefferson, Lycoming, McKean, Potter, Tioga, Warren
McKean County PA Wilds Planning Team Implementation 2014
BRC-SR-19-173
$54,405.00 $54,000.00 19 Partnerships Projects
$83,905.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 140 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Cameron, Clarion, Clearfield, Clinton, Elk, Forest, Jefferson, Lycoming, McKean, Potter, Tioga, Warren
McKean County PA Wilds Planning Team Implementation 2014
BRC-SR-19-173
$54,405.00 $54,000.00 19 Partnerships Projects
$83,905.00 COMM_Key
Cameron, Clarion, Clearfield, Clinton, Elk, Forest, Jefferson, Lycoming, McKean, Potter, Tioga, Warren
McKean County PA Wilds Planning Team Implementation 2014
BRC-SR-19-173
$54,405.00 $54,000.00 19 Partnerships Projects
$83,905.00 COMM_Key
Cameron, Clarion, Clearfield, Clinton, Elk, Forest, Jefferson, Lycoming, McKean, Potter, Tioga, Warren
McKean County PA Wilds Planning Team Implementation 2014
BRC-SR-19-173
$54,405.00 $54,000.00 19 Partnerships Projects
$83,905.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 141 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Cameron, Clarion, Clearfield, Clinton, Elk, Forest, Jefferson, Lycoming, McKean, Potter, Tioga, Warren
McKean County PA Wilds Planning Team Implementation 2014
BRC-SR-19-173
$54,405.00 $54,000.00 19 Partnerships Projects
$83,905.00 COMM_Key
Cameron, Clarion, Clearfield, Clinton, Elk, Forest, Jefferson, Lycoming, McKean, Potter, Tioga, Warren
McKean County PA Wilds Planning Team Implementation 2014
BRC-SR-19-173
$54,405.00 $54,000.00 19 Partnerships Projects
$83,905.00 COMM_Key
Cameron, Clarion, Clearfield, Clinton, Elk, Forest, Jefferson, Lycoming, McKean, Potter, Tioga, Warren
McKean County PA Wilds Planning Team Implementation 2014
BRC-SR-19-173
$54,405.00 $54,000.00 19 Partnerships Projects
$83,905.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 142 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Cameron, Clarion, Clearfield, Clinton, Elk, Forest, Jefferson, Lycoming, McKean, Potter, Tioga, Warren
McKean County PA Wilds Planning Team Implementation 2014
BRC-SR-19-173
$54,405.00 $54,000.00 19 Partnerships Projects
$83,905.00 COMM_Key
Cameron, Clarion, Clearfield, Clinton, Elk, Forest, Jefferson, Lycoming, McKean, Potter, Tioga, Warren
McKean County PA Wilds Planning Team Implementation 2014
BRC-SR-19-173
$54,405.00 $54,000.00 19 Partnerships Projects
$83,905.00 COMM_Key
Cameron, Clarion, Clearfield, Clinton, Elk, Forest, Jefferson, Lycoming, McKean, Potter, Tioga, Warren
McKean County PA Wilds Planning Team Implementation 2014
BRC-SR-19-173
$54,405.00 $54,000.00 19 Partnerships Projects
$83,905.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 143 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Cameron, Clarion, Clearfield, Clinton, Elk, Forest, Jefferson, Lycoming, McKean, Potter, Tioga, Warren
McKean County PA Wilds Planning Team Implementation 2014
BRC-SR-19-173
$54,405.00 $54,000.00 19 Partnerships Projects
$83,905.00 COMM_Key
Cameron, Clarion, Clearfield, Clinton, Elk, Forest, Jefferson, Lycoming, McKean, Potter, Tioga, Warren
McKean County PA Wilds Planning Team Implementation 2014
BRC-SR-19-173
$54,405.00 $54,000.00 19 Partnerships Projects
$83,905.00 COMM_Key
Cameron, Clarion, Clearfield, Clinton, Elk, Forest, Jefferson, Lycoming, McKean, Potter, Tioga, Warren
McKean County PA Wilds Planning Team Implementation 2014
BRC-SR-19-173
$54,405.00 $54,000.00 19 Partnerships Projects
$83,905.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 144 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Cameron, Clarion, Clearfield, Clinton, Elk, Forest, Jefferson, Lycoming, McKean, Potter, Tioga, Warren
McKean County PA Wilds Planning Team Implementation 2014
BRC-SR-19-173
$54,405.00 $54,000.00 19 Partnerships Projects
$83,905.00 COMM_Key
Cameron, Clarion, Clearfield, Clinton, Elk, Forest, Jefferson, Lycoming, McKean, Potter, Tioga, Warren
McKean County PA Wilds Planning Team Implementation 2014
BRC-SR-19-173
$54,405.00 $54,000.00 19 Partnerships Projects
$83,905.00 COMM_Key
Cameron, Clarion, Clearfield, Clinton, Elk, Forest, Jefferson, Lycoming, McKean, Potter, Tioga, Warren
McKean County PA Wilds Planning Team Implementation 2014
BRC-SR-19-173
$54,405.00 $54,000.00 19 Partnerships Projects
$83,905.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 145 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Cameron, Clarion, Clearfield, Clinton, Elk, Forest, Jefferson, Lycoming, McKean, Potter, Tioga, Warren
McKean County PA Wilds Planning Team Implementation 2014
BRC-SR-19-173
$54,405.00 $54,000.00 19 Partnerships Projects
$83,905.00 COMM_Key
Cameron, Clarion, Clearfield, Clinton, Elk, Forest, Jefferson, Lycoming, McKean, Potter, Tioga, Warren
McKean County PA Wilds Planning Team Implementation 2014
BRC-SR-19-173
$54,405.00 $54,000.00 19 Partnerships Projects
$83,905.00 COMM_Key
Cameron, Clearfield, Elk, Jefferson, McKean, Potter
Elk County North Central Greenways and Open Space Plan
BRC-‐TAG-‐13.6-‐593
$100,000 $100,000 13.6 Greenway Plans (COMM)
$200,000 COMM_Key
Cameron, Clearfield, Elk, Jefferson, McKean, Potter
North Central Pennsylvania Regional Planning and Development Commission
North Central PA Greenways Implementation Grant Program
BRC-‐TAG-‐16-‐80
$150,000 $150,000 16 Education and Training (COMM)
$300,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 146 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Cameron, Elk West Creek Recreational Trail Association, Inc.
West Creek Recreational Trail Master Site Development Plan
BRC-‐RTP-‐13-‐503
$19,500 $19,500 13 Feasibility Studies (RT)
$39,000 RT_Key
Carbon Beaver Meadows Borough
Third St. Playground -‐ Phase II
KEY-‐SC-‐3-‐14 $20,000 $20,000 3 Small Communities/Small Projects (COMM)
$23,500 COMM_Key
Carbon Beaver Meadows Borough
Third Street Playground
KEY-‐SC-‐2-‐7 $20,000 $20,000 2 Small Communities/Small Projects (COMM)
$21,900 COMM_Key
Carbon Bowmanstown Borough
Borough Park -‐ Phase II
BRC-‐SC-‐14-‐76
$40,000 $40,000 14 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Carbon Bowmanstown Borough
Bowmanstown Recreational Park -‐ Phase I
BRC-‐SC-‐11-‐108
$40,000 $40,000 11 Small Communities/Small Projects (COMM)
$67,100 COMM_Key
Carbon Carbon County Carbon County Greenways and Open Space Network Plan
BRC-‐TAG-‐13.3-‐462
$36,500 $36,500 13.3 Greenway Plans (COMM)
$73,000 COMM_Key
Carbon Carbon County Delaware & Lehigh Trail-‐Weissport to East Penn Boat Launch-‐Development
BRC-‐PRD-‐18-‐52
$213,020 $208,200 18 Park Rehabilitation and Development (COMM)
$427,163 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 147 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Carbon Carbon County Mauch Chunk Lake Park
BRC-‐PRD-‐13-‐345
$12,800 $12,800 13 Park Rehabilitation and Development (COMM)
$25,700 COMM_Key
Carbon Carbon County Nesquehoning Trestle to Jim Thorpe Rail w/ Trail Development
BRC-‐RTD-‐12-‐5
$331,200 $331,200 12 Rail Rehabilitation and Development (RT)
$662,400 RT_Key
Carbon Franklin Township Central Carbon County Recreation, Open Space and Greenway Plan
BRC-‐TAG-‐15-‐93
$71,880 $40,000 15 Comp. Rec., Park, & Open Space Plans (COMM)
$249,204 COMM_Key
Carbon Franklin Township Phifer Ice Dam Park KEY-‐PRD-‐5-‐70
$31,700 $31,700 5 Park Rehabilitation and Development (COMM)
$63,400 COMM_Key
Carbon Franklin Township Phifer Ice Dam Park KEY-‐SC-‐1-‐51 $20,000 $20,000 1 Small Communities/Small Projects (COMM)
$34,000 COMM_Key
Carbon Jim Thorpe Borough Delaware & Lehigh Trail – Jim Thorpe Connection – Development
BRC-PRD-19-87
$586,642.00 $365,000.00 19 Park Rehabilitation and Development (COMM)
$730,802.58 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 148 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Carbon Jim Thorpe Borough Delaware & Lehigh Trail – Jim Thorpe Connection – Development
BRC-PRD-19-87
$586,642.00 $365,000.00 19 Park Rehabilitation and Development (COMM)
$730,802.58 COMM_Key
Carbon Jim Thorpe Borough Delaware & Lehigh Trail – Jim Thorpe Connection – Development
BRC-PRD-19-87
$586,642.00 $365,000.00 19 Park Rehabilitation and Development (COMM)
$730,802.58 COMM_Key
Carbon Jim Thorpe Borough Kemmerer and Memorial Parks
KEY-‐PRD-‐5-‐98
$126,000 $125,000 5 Park Rehabilitation and Development (COMM)
$252,000 COMM_Key
Carbon Jim Thorpe Borough Master Site Development Plans
KEY-‐TAG-‐3-‐99
$11,500 $11,500 3 Master Site Plans (COMM)
$23,000 COMM_Key
Carbon Kidder Township Comp. Plan-‐Greenways, Open Space & Non-‐Motorized Rec Trails
BRC-‐TAG-‐13.6-‐596
$10,000 $10,000 13.6 Greenway Plans (COMM)
$20,000 COMM_Key
Carbon Lansford Borough Ashton Hill Community Park
BRC-‐SC-‐14-‐93
$30,000 $30,000 14 Small Communities/Small Projects (COMM)
$40,000 COMM_Key
Carbon Lansford Borough Community Park Rehabilitation
BRC-‐SC-‐12-‐102
$20,000 $20,000 12 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 149 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Carbon Lansford Borough Community Pool Playground
BRC-‐SC-‐11-‐133
$39,500 $39,000 11 Small Communities/Small Projects (COMM)
$59,000 COMM_Key
Carbon Lehigh Canal Recreation Commission
Lehigh Canal Park BRC-‐PRD-‐6-‐95
$120,000 $120,000 6 Park Rehabilitation and Development (COMM)
$600,000 COMM_Key
Carbon Lehighton Borough Swimming Pool BRC-‐PRD-‐13-‐115
$370,900 $350,000 13 Park Rehabilitation and Development (COMM)
$741,900 COMM_Key
Carbon Lehighton Borough Two Sites KEY-‐PRD-‐4-‐83
$55,950 $55,000 4 Park Rehabilitation and Development (COMM)
$111,900 COMM_Key
Carbon Lower Towamensing Township
Knights of Columbus Property
BRC-‐ACQ-‐7-‐108
$89,000 $65,000 7 Acquisition (COMM)
$169,000 COMM_Key
Carbon Lower Towamensing Township
Phase One Small Community Development
BRC-‐SC-‐8-‐108
$40,000 $40,000 8 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Carbon Penn Forest Township
Recreation Park -‐ Phases 1 and 2 -‐ Development
BRC-‐PRD-‐15-‐66
$392,540 $509,000 15 Park Rehabilitation and Development (COMM)
$867,159 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 150 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Carbon Summit Hill Borough Western Carbon Recreation, Park and Open Space Plan
BRC-‐TAG-‐15-‐103
$29,570 $35,725 15 Comp. Rec., Park, & Open Space Plans (COMM)
$137,960 COMM_Key
Carbon Weatherly Borough Eurana Park BRC-‐SC-‐6-‐195
$20,000 $20,000 6 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Carbon Weatherly Borough Eurana Park KEY-‐SC-‐4-‐166
$20,000 $20,000 4 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Carbon Weatherly Borough Eurana Park KEY-‐SC-‐5-‐218
$20,000 $20,000 5 Small Communities/Small Projects (COMM)
$21,500 COMM_Key
Carbon Wildlife Information Center, Inc.
Gause Land Acquisition - Addition to Lehigh Gap Nature
BRC-LTA-19-32
$13,367.00 $13,300.00 19 Open Space Acquisition (LT)
$26,734.00 LT_Key
Carbon Wildlife Information Center, Inc.
Gause Land Acquisition - Addition to Lehigh Gap Nature
BRC-LTA-19-32
$13,367.00 $13,300.00 19 Open Space Acquisition (LT)
$26,734.00 LT_Key
Carbon Wildlife Information Center, Inc.
Gause Land Acquisition - Addition to Lehigh Gap Nature
BRC-LTA-19-32
$13,367.00 $13,300.00 19 Open Space Acquisition (LT)
$26,734.00 LT_Key
Carbon, Lehigh, Luzerne, Monroe, Northampton
Wildlands Conservancy, Inc.
Enhancing the Lehigh River Water Trail
BRC-‐RCI-‐17-‐166
$39,750 $39,700 17 Implementation (RIV)
$81,750 RIVER_Key
Keystone Fund Projects by County (1994-‐2013)
Page 151 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Centre Bellefonte Borough Kepler Pool Feasibility Study
BRC-‐TAG-‐13.3-‐458
$15,000 $15,000 13.3 Feasibility Studies (COMM)
$30,000 COMM_Key
Centre Bellefonte Borough Reynolds Avenue Park Acquisition
BRC-‐RCA-‐11-‐3
$19,800 $21,800 11 Acquisition (RIV)
$43,600 RIVER_Key
Centre Bellefonte Borough Talleyrand Park-‐ Phase I
BRC-‐PRD-‐13-‐88
$129,800 $129,000 13 Park Rehabilitation and Development (COMM)
$259,600 COMM_Key
Centre Benner Township Benner Springs Master Site Plan
BRC-‐RCD-‐12-‐4
$98,600 $98,600 12 Development (RIV)
$197,200 COMM_Key
Centre Benner Township Buffalo Run Community Park
KEY-‐PRD-‐3-‐16
$112,000 $112,000 3 Park Rehabilitation and Development (COMM)
$239,100 COMM_Key
Centre Benner Township Peer to Peer BRC-‐TAG-‐12-‐270
$10,000 $10,000 12 Peer-‐to-‐Peer Tech. Assistance (COMM)
$11,000 COMM_Key
Centre Benner Township Spring Creek Canyon Trail – Phase 1 – Development
BRC-PRD-19-57
$114,944.37 $115,000.00 19 Park Rehabilitation and Development (COMM)
$229,888.74 COMM_Key
Centre Benner Township Spring Creek Canyon Trail – Phase 1 – Development
BRC-PRD-19-57
$114,944.37 $115,000.00 19 Park Rehabilitation and Development (COMM)
$229,888.74 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 152 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Centre Benner Township Spring Creek Canyon Trail – Phase 1 – Development
BRC-PRD-19-57
$114,944.37 $115,000.00 19 Park Rehabilitation and Development (COMM)
$229,888.74 COMM_Key
Centre Centre County Bellefonte Central Rail Trail Feasibility Study
BRC-‐RTP-‐11-‐3
$43,500 $43,500 11 Feasibility Studies (RT)
$87,000 RT_Key
Centre Centre County Nittany & Bald Eagle Valleys Greenway
KEY-‐TAG-‐4-‐26
$30,000 $30,000 4 Greenway Plans (COMM)
$60,000 COMM_Key
Centre Centre Region Council of Governments
Oak Hall Park Master Site Plan
BRC-‐TAG-‐12-‐228
$38,000 $38,000 12 Master Site Plans (COMM)
$76,000 COMM_Key
Centre Centre Region Council of Governments
PSU Whitehall Road Acquisition
BRC-‐ACQ-‐12-‐70
$159,200 $159,000 12 Acquisition (COMM)
$924,600 COMM_Key
Centre Centre Region Council of Governments
Whitehall Acquisition -‐ Park Expansion
BRC-‐ACQ-‐16-‐21
$217,500 $191,000 16 Acquisition (COMM)
$435,000 COMM_Key
Centre Centre Region Council of Governments
Whitehall Road Regional Parkland Master Site Plan
BRC-‐TAG-‐13.6-‐589
$40,000 $40,000 13.6 Master Site Plans (COMM)
$80,000 COMM_Key
Centre Centre Regional Recreation Authority
Park Forest Community Swimming Pool
BRC-‐PRD-‐13-‐95
$350,000 $350,000 13 Park Rehabilitation and Development (COMM)
$3,200,000 COMM_Key
Centre Centre Regional Recreation Authority
Park Forest Pool BRC-‐TAG-‐11.5-‐20
$22,200 $22,000 11.5 Master Site Plans (COMM)
$44,500 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 153 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Centre Centre Regional Recreation Authority
Regional Aquatics Feasibility Study
BRC-‐TAG-‐6-‐34
$7,500 $7,500 6 Feasibility Studies (COMM)
$15,000 COMM_Key
Centre Centre Regional Recreation Authority
Whitehall Road Regional Park -‐ Phase 1 -‐ Development
BRC-‐PRD-‐17-‐110
$300,000 $300,000 17 Park Rehabilitation and Development (COMM)
$5,246,000 COMM_Key
Centre Centre Regional Recreation Authority
William L. Welch Swimming Pool Study
BRC-‐TAG-‐12-‐229
$33,000 $33,000 12 Master Site Plans (COMM)
$66,000 COMM_Key
Centre Centre Regional Recreation Authority
William L.Welch Community Swimming Pool
BRC-‐PRD-‐14-‐124
$400,000 $375,000 14 Park Rehabilitation and Development (COMM)
$5,400,000 COMM_Key
Centre ClearWater Conservancy of Central PA, Inc.
Aikens Acquisition (Galbraith Gap)
BRC-‐LTA-‐16-‐234
$349,720 $350,000 16 Open Space Acquisition (LT)
$699,440 LT_Key
Centre ClearWater Conservancy of Central PA, Inc.
Berkobin Tract Acquisition -‐ (Scotia Barrens Wildlife Cor.)
BRC-‐LTA-‐13.6-‐609
$367,000 $292,000 13.6 Open Space Acquisition (LT)
$734,000 LT_Key
Centre ClearWater Conservancy of Central PA, Inc.
Hale Property Acquisition
BRC-LTA-19-18
$576,500.00 $565,500.00 19 Open Space Acquisition (LT)
$1,153,000.00 LT_Key
Centre ClearWater Conservancy of Central PA, Inc.
Hale Property Acquisition
BRC-LTA-19-18
$576,500.00 $565,500.00 19 Open Space Acquisition (LT)
$1,153,000.00 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 154 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Centre ClearWater Conservancy of Central PA, Inc.
Hale Property Acquisition
BRC-LTA-19-18
$576,500.00 $565,500.00 19 Open Space Acquisition (LT)
$1,153,000.00 LT_Key
Centre ClearWater Conservancy of Central PA, Inc.
Hale Property Acquisition
BRC-LTA-19-18
$576,500.00 $565,500.00 19 Open Space Acquisition (LT)
$1,153,000.00 LT_Key
Centre ClearWater Conservancy of Central PA, Inc.
Millbrook Marsh Plan
KEY-‐LTP-‐2-‐2 $13,000 $13,000 2 Critical Habitat Planning (LT)
$26,000 LT_Key
Centre ClearWater Conservancy of Central PA, Inc.
Musser Gap Gateway Acquisition
BRC-‐LTA-‐11-‐9
$606,000 $806,000 11 Critical Habitat Acquisition (LT)
$1,212,000 LT_Key
Centre ClearWater Conservancy of Central PA, Inc.
Spring Creek Watershed Rivers Cons. Plan
KEY-‐RCP-‐96-‐12
$50,000 $50,000 3 Planning (RIV) $100,000 RIVER_Key
Centre College Township Township Park BRC-‐PRD-‐8-‐46
$220,000 $180,000 8 Park Rehabilitation and Development (COMM)
$496,000 COMM_Key
Centre Ferguson Township Fairbrook Park BRC-‐PRD-‐7-‐74
$117,000 $100,000 7 Park Rehabilitation and Development (COMM)
$234,255 COMM_Key
Centre Ferguson Township Haymarket Park -‐ Phase I
KEY-‐PRD-‐4-‐58
$100,000 $100,000 4 Park Rehabilitation and Development (COMM)
$200,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 155 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Centre Ferguson Township Sunday Land Acquisition
BRC-‐ACQ-‐17-‐93
$79,000 $67,200 17 Acquisition (COMM)
$158,000 COMM_Key
Centre Ferguson Township Tom Tudek Memorial Park
BRC-‐PRD-‐13-‐105
$100,000 $100,000 13 Park Rehabilitation and Development (COMM)
$347,200 COMM_Key
Centre Ferguson Township Tudek Memorial Park-‐Phase I
KEY-‐PRD-‐2-‐49
$90,000 $90,000 2 Park Rehabilitation and Development (COMM)
$180,000 COMM_Key
Centre Ferguson Township Westfield/Hillside Farm Estates Park- Phase1- Development
BRC-PRD-19-78
$200,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)
$455,830.00 COMM_Key
Centre Ferguson Township Westfield/Hillside Farm Estates Park- Phase1- Development
BRC-PRD-19-78
$200,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)
$455,830.00 COMM_Key
Centre Ferguson Township Westfield/Hillside Farm Estates Park- Phase1- Development
BRC-PRD-19-78
$200,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)
$455,830.00 COMM_Key
Centre Gregg Township Penns Valley Trail Study
BRC-‐RTP-‐17-‐207
$32,370 $32,300 17 Feasibility Studies (RT)
$64,740 COMM_Key
Centre Harris Township Fasick Park -‐ Development
BRC-‐SC-‐17-‐39
$40,000 $40,000 17 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 156 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Centre Harris Township Nittany-‐View Park KEY-‐SC-‐1-‐56 $20,000 $20,000 1 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Centre Headwaters Charitable Trust
Black Moshannon Natural Area
KEY-‐LTA-‐5-‐3 $400,000 $300,000 5 Open Space Acquisition (LT)
$843,050 LT_Key
Centre Howard Borough Borough Park KEY-‐SC-‐5-‐89 $18,500 $18,500 5 Small Communities/Small Projects (COMM)
$37,000 COMM_Key
Centre Howard Borough Howard Borough Pedestrian/Bicycle Trail – Development
BRC-‐PRD-‐17-‐73
$46,000 $46,000 17 Park Rehabilitation and Development (COMM)
$313,950 COMM_Key
Centre Huston Township Community Park KEY-‐SC-‐2-‐66 $20,000 $20,000 2 Small Communities/Small Projects (COMM)
$24,000 COMM_Key
Centre Huston Township Muncy Mountain Park Master Plan
BRC-‐TAG-‐9-‐99
$9,000 $9,000 9 Master Site Plans (COMM)
$18,000 COMM_Key
Centre Milesburg Borough Milesburg Community Park
BRC-‐SC-‐9-‐135
$36,900 $30,000 9 Small Communities/Small Projects (COMM)
$43,800 COMM_Key
Centre Millheim Borough Borough Park-‐ Phase 2 -‐ Development
BRC-‐PRD-‐16-‐147
$57,500 $57,500 16 Park Rehabilitation and Development (COMM)
$115,124 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 157 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Centre Millheim Borough Millheim Borough Recreation Park Plan
BRC-‐TAG-‐12-‐252
$11,600 $11,600 12 Master Site Plans (COMM)
$23,100 COMM_Key
Centre Patton Township Haugh Park KEY-‐PRD-‐3-‐162
$200,000 $100,000 3 Park Rehabilitation and Development (COMM)
$400,000 COMM_Key
Centre Philipsburg Borough 13th Street/Slabtown Playground- Development
BRC-SC-19-46
$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)
$60,000.00 COMM_Key
Centre Philipsburg Borough 13th Street/Slabtown Playground- Development
BRC-SC-19-46
$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)
$60,000.00 COMM_Key
Centre Philipsburg Borough 13th Street/Slabtown Playground- Development
BRC-SC-19-46
$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)
$60,000.00 COMM_Key
Centre Philipsburg Borough Cold Stream Dam Recreation Area Renovation
BRC-‐PRD-‐12-‐187
$60,000 $60,000 12 Park Rehabilitation and Development (COMM)
$120,000 COMM_Key
Centre Philipsburg Borough Powerhouse Park KEY-‐SC-‐2-‐122
$20,000 $20,000 2 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Centre Port Matilda Borough
Borough Park KEY-‐SC-‐5-‐167
$20,000 $20,000 5 Small Communities/Small Projects (COMM)
$31,996 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 158 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Centre Potter Township Peer to Peer BRC-‐TAG-‐12-‐272
$10,000 $10,000 12 Peer-‐to-‐Peer Tech. Assistance (COMM)
$11,000 COMM_Key
Centre Potter Township PSU Land Acquisition BRC-‐ACQ-‐11.5-‐13
$375,000 $250,000 11.5 Acquisition (COMM)
$750,000 COMM_Key
Centre Snow Shoe Township
Township Park KEY-‐SC-‐5-‐185
$17,880 $18,000 5 Small Communities/Small Projects (COMM)
$19,080 COMM_Key
Centre Snow Shoe Township
Township Park Renovation
BRC-‐SC-‐12-‐124
$48,000 $24,700 12 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Centre Spring Creek Chapter of Trout Unlimited
Sinking Creek KEY-‐CHP-‐2-‐5
$5,000 $5,000 5 Coldwater Heritage Partnership
$5,000 RIVER_Key
Centre Spring Creek Chapter of Trout Unlimited
Spring Creek Access & Habitat Restoration
BRC-‐RCD-‐13.3-‐511
$179,200 $179,200 13.3 Development (RIV)
$539,700 RIVER_Key
Centre Spring Township Pleasant Gap Elementary School Park Site
BRC-‐PRD-‐8-‐185
$53,700 $50,000 8 Park Rehabilitation and Development (COMM)
$107,400 COMM_Key
Centre State College Borough
Community Flower Garden
KEY-‐PRD-‐5-‐191
$10,000 $10,000 5 Park Rehabilitation and Development (COMM)
$20,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 159 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Centre State College Borough High Point Park- Development
BRC-PRD-19-119
$25,000.00 $25,000.00 19 Park Rehabilitation and Development (COMM)
$56,248.00 COMM_Key
Centre State College Borough High Point Park- Development
BRC-PRD-19-119
$25,000.00 $25,000.00 19 Park Rehabilitation and Development (COMM)
$56,248.00 COMM_Key
Centre State College Borough High Point Park- Development
BRC-PRD-19-119
$25,000.00 $25,000.00 19 Park Rehabilitation and Development (COMM)
$56,248.00 COMM_Key
Centre State College Borough
Holmes-‐Foster Park Master Site Plan
BRC-‐TAG-‐18-‐150
$10,000 $10,000 18 Master Site Plans (COMM)
$25,000 COMM_Key
Centre State College Borough
Master Site Development Plan
KEY-‐TAG-‐2-‐150
$6,000 $6,000 2 Master Site Plans (COMM)
$12,000 COMM_Key
Centre State College Borough
Orchard Park BRC-‐PRD-‐6-‐174
$82,500 $82,500 6 Park Rehabilitation and Development (COMM)
$165,000 COMM_Key
Centre State College Borough
Orchard Park -‐ Phase I
KEY-‐PRD-‐4-‐148
$146,100 $100,000 4 Park Rehabilitation and Development (COMM)
$292,300 COMM_Key
Centre State College Borough
Orchard Park Expansion
KEY-‐ACQ-‐1-‐132
$237,500 $100,000 1 Acquisition (COMM)
$475,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 160 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Centre State College Borough
Orchard Park-‐ Development
BRC-‐PRD-‐18-‐102
$50,000 $50,000 18 Park Rehabilitation and Development (COMM)
$106,212 COMM_Key
Centre State College Borough
Sunset Park Tot Lot and Trail
BRC-‐PRD-‐13-‐146
$15,000 $15,000 13 Park Rehabilitation and Development (COMM)
$31,200 COMM_Key
Centre State College Borough
Westerly Parkway -‐ Wetland Education Site
BRC-‐PRD-‐14-‐173
$36,700 $36,700 14 Park Rehabilitation and Development (COMM)
$73,400 COMM_Key
Centre The Conservation Fund
Curtin Estate Lands BRC-‐LTA-‐7-‐1
$800,000 $770,000 7 Open Space Acquisition (LT)
$1,600,000 LT_Key
Centre Unionville Borough Borough Park BRC-‐SC-‐8-‐196
$40,000 $40,000 8 Small Communities/Small Projects (COMM)
$60,600 COMM_Key
Centre Unionville Borough Unionville Borough Park
BRC-‐SC-‐10-‐102
$40,000 $40,000 10 Small Communities/Small Projects (COMM)
$61,720 COMM_Key
Centre Walker Township Walker Park BRC-‐SC-‐6-‐185
$20,000 $20,000 6 Small Communities/Small Projects (COMM)
$33,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 161 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Centre Walker Township Walker Township Mini Comp Plan/Master Plan
KEY-‐TAG-‐4-‐162
$10,000 $10,000 4 Comp. Rec., Park, & Open Space Plans (COMM)
$20,000 COMM_Key
Centre, Clinton
The Conservation Fund
Litke Estate Acquisition
BRC-‐LTA-‐8-‐17
$2,000,000 $1,000,000 8 Critical Habitat Acquisition (LT)
$4,000,000 LT_Key
Centre, Lycoming
SEDA-‐Council of Governments
TreeVitalize Metros BRC-‐TV-‐15-‐32
$57,000 $57,000 15 Park Rehabilitation and Development (COMM)
$114,000 COMM_Key
Chester Atglen Borough Community Park Master Plan
BRC-‐TAG-‐6-‐13
$10,000 $10,000 6 Master Site Plans (COMM)
$20,000 COMM_Key
Chester Brandywine Conservancy
Big Elk Creek Woods KEY-‐LTA-‐4-‐2 $348,000 $200,000 4 Critical Habitat Acquisition (LT)
$696,200 LT_Key
Chester Brandywine Conservancy
Krause Conservation Easement
BRC-‐LTA-‐6-‐4
$105,000 $100,000 6 Open Space Acquisition (LT)
$210,000 LT_Key
Chester Brandywine Valley Association
Pocopson Program KEY-‐LTA-‐3-‐2 $75,000 $55,000 3 Critical Habitat Acquisition (LT)
$150,000 LT_Key
Chester Caln Township King Highway Master Plan
BRC-‐TAG-‐12.5-‐26
$17,500 $17,000 12.5 Master Site Plans (COMM)
$35,000 COMM_Key
Chester Caln Township Lloyd Park Master Plan
BRC-‐TAG-‐9-‐40
$15,000 $15,000 9 Master Site Plans (COMM)
$30,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 162 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Chester Caln Township Lloyd Park Phase 1 Development
BRC-‐PRD-‐12-‐132
$200,000 $200,000 12 Park Rehabilitation and Development (COMM)
$594,700 COMM_Key
Chester Caln Township Municipal and Lloyd Parks
KEY-‐PRD-‐5-‐27
$100,000 $100,000 5 Park Rehabilitation and Development (COMM)
$400,000 COMM_Key
Chester Charlestown Township
Coleman Conservation Easement (Pigeon Run)
BRC-‐ACQ-‐13-‐234
$426,400 $109,000 13 Acquisition (COMM)
$852,700 COMM_Key
Chester Charlestown Township
McDevitt Conservation Easement
BRC-‐ACQ-‐13-‐232
$1,447,500 $350,000 13 Acquisition (COMM)
$2,895,000 COMM_Key
Chester Charlestown Township
Stevens Property Conservation Easement
BRC-‐ACQ-‐13-‐233
$79,700 $79,000 13 Acquisition (COMM)
$159,400 COMM_Key
Chester Chester County Brandywine Battlefield Park -‐ Phase 2
BRC-‐ACQ-‐8-‐39
$500,000 $500,000 8 Acquisition (COMM)
$4,000,000 COMM_Key
Chester Chester County Chester County Schuylkill River Trail Construction
BRC-‐RTD-‐15-‐108
$969,577 $406,035 15 Rail Rehabilitation and Development (RT)
$2,003,154 RT_Key
Chester Chester County Chester Countywide Watershed Plan
KEY-‐RCP-‐5-‐5
$230,000 $100,000 5 Planning (RIV) $380,000 RIVER_Key
Keystone Fund Projects by County (1994-‐2013)
Page 163 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Chester Chester County Chester Valley Trail -‐ Phase III Construction
BRC-‐PRD-‐17-‐221
$500,000 $500,000 17 Park Rehabilitation and Development (COMM)
$1,250,000 COMM_Key
Chester Chester County Exton Park - Phase 1A -Development
BRC-PRD-19-67
$240,000.00 $240,000.00 19 Park Rehabilitation and Development (COMM)
$500,000.00 COMM_Key
Chester Chester County Exton Park - Phase 1A -Development
BRC-PRD-19-67
$240,000.00 $240,000.00 19 Park Rehabilitation and Development (COMM)
$500,000.00 COMM_Key
Chester Chester County Exton Park - Phase 1A -Development
BRC-PRD-19-67
$240,000.00 $240,000.00 19 Park Rehabilitation and Development (COMM)
$500,000.00 COMM_Key
Chester Chester County Exton Park -‐ Phase I BRC-‐PRD-‐14-‐125
$300,000 $250,000 14 Park Rehabilitation and Development (COMM)
$880,000 COMM_Key
Chester Chester County Interpretive Trail BRC-‐PRD-‐6-‐38
$100,000 $100,000 6 Park Rehabilitation and Development (COMM)
$290,000 COMM_Key
Chester Chester County Master Plan for Several Parks
KEY-‐TAG-‐4-‐28
$49,000 $40,000 4 Master Site Plans (COMM)
$100,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 164 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Chester Chester County Northern Struble Trail Study - Planning
BRC-TAG-19-129
$35,000.00 $35,000.00 19 Trail Study (COMM)
$70,030.00 COMM_Key
Chester Chester County Northern Struble Trail Study - Planning
BRC-TAG-19-129
$35,000.00 $35,000.00 19 Trail Study (COMM)
$70,030.00 COMM_Key
Chester Chester County Northern Struble Trail Study - Planning
BRC-TAG-19-129
$35,000.00 $35,000.00 19 Trail Study (COMM)
$70,030.00 COMM_Key
Chester Chester County Northern Struble Trail Study - Planning
BRC-TAG-19-129
$35,000.00 $35,000.00 19 Trail Study (COMM)
$70,030.00 COMM_Key
Chester Chester County Northern Struble Trail Study - Planning
BRC-TAG-19-129
$35,000.00 $35,000.00 19 Trail Study (COMM)
$70,030.00 COMM_Key
Chester Chester County Northern Struble Trail Study - Planning
BRC-TAG-19-129
$35,000.00 $35,000.00 19 Trail Study (COMM)
$70,030.00 COMM_Key
Chester Chester County Struble Trail KEY-‐RTD-‐95-‐8
$25,400 $25,400 1 Rail Rehabilitation and Development (RT)
$61,700 RT_Key
Chester Coatesville City Activity Center BRC-‐TAG-‐8-‐45
$500,000 $20,000 8 Feasibility Studies (COMM)
$2,500,000 COMM_Key
Chester Coatesville City Brandywine Creek Trail
BRC-‐PRD-‐13-‐97
$250,000 $250,000 13 Park Rehabilitation and Development (COMM)
$1,500,000 COMM_Key
Chester Coatesville City Inter-‐Municipal Neighborhood Park
BRC-‐PRD-‐6-‐42
$182,000 $182,000 6 Park Rehabilitation and Development (COMM)
$512,000 COMM_Key
Chester Coatesville City James Memorial Park
BRC-‐ACQ-‐7-‐39
$39,325 $39,000 7 Acquisition (COMM)
$79,325 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 165 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Chester Coatesville City Lumber Street Park KEY-‐PRD-‐5-‐36
$70,000 $70,000 5 Park Rehabilitation and Development (COMM)
$140,000 COMM_Key
Chester Downingtown Borough
Brandywine Trail KEY-‐PRD-‐3-‐50
$112,100 $100,000 3 Park Rehabilitation and Development (COMM)
$224,300 COMM_Key
Chester Downingtown Borough
Park System Master Site Plans
KEY-‐TAG-‐4-‐42
$23,300 $23,300 4 Master Site Plans (COMM)
$46,600 COMM_Key
Chester Downingtown Borough
Sky's the Limit All-‐Abilities Playground Project
BRC-‐PRD-‐10-‐115
$100,000 $75,000 10 Park Rehabilitation and Development (COMM)
$374,400 COMM_Key
Chester East Bradford Township
East Branch Brandywine Trail -‐ Phase 3 -‐ Development
BRC-‐PRD-‐18-‐65
$80,000 $80,000 18 Park Rehabilitation and Development (COMM)
$162,385 COMM_Key
Chester East Bradford Township
Schramm Acquisition BRC-‐ACQ-‐14-‐53
$1,521,850 $300,000 14 Acquisition (COMM)
$3,043,700 COMM_Key
Chester East Bradford Township
Skelp Level Park KEY-‐ACQ-‐4-‐43
$410,000 $100,000 4 Acquisition (COMM)
$910,000 COMM_Key
Chester East Brandywine Township
Bondsville Mill Park Master Site Plan
BRC-‐TAG-‐14-‐199
$30,700 $30,700 14 Master Site Plans (COMM)
$61,300 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 166 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Chester East Brandywine Township
Community Park -‐ Phase II
KEY-‐PRD-‐4-‐44
$150,000 $75,000 4 Park Rehabilitation and Development (COMM)
$450,000 COMM_Key
Chester East Brandywine Township
Community Park Phase III
BRC-‐ACQ-‐7-‐54
$127,619 $127,000 7 Acquisition (COMM)
$585,869 COMM_Key
Chester East Caln Township Township Park Master Plan
KEY-‐TAG-‐4-‐45
$15,000 $15,000 4 Master Site Plans (COMM)
$30,000 COMM_Key
Chester East Coventry Township
Ellis Woods Park BRC-‐TAG-‐7-‐55
$20,000 $20,000 7 Master Site Plans (COMM)
$40,000 COMM_Key
Chester East Fallowfield Township
Community Park Development -‐ Phase 1
BRC-‐PRD-‐12-‐148
$250,000 $250,000 12 Park Rehabilitation and Development (COMM)
$550,000 COMM_Key
Chester East Fallowfield Township
East Fallowfield Community Park
BRC-‐TAG-‐7-‐57
$27,000 $27,000 7 Master Site Plans (COMM)
$54,000 COMM_Key
Chester East Fallowfield Township
East Fallowfield Township Community Park -‐Development
BRC-‐PRD-‐18-‐66
$137,650 $137,600 18 Park Rehabilitation and Development (COMM)
$275,300 COMM_Key
Chester East Fallowfield Township
Township Park KEY-‐ACQ-‐2-‐40
$254,900 $155,000 2 Acquisition (COMM)
$561,000 COMM_Key
Chester East Marlborough Township
Unionville Community Park -‐ Phase 1-‐ Development
BRC-‐PRD-‐17-‐116
$455,000 $430,000 17 Park Rehabilitation and Development (COMM)
$1,005,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 167 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Chester East Marlborough Township
Unionville Community Park - Phase 2 -Development
BRC-PRD-19-76
$534,794.00 $250,000.00 19 Park Rehabilitation and Development (COMM)
$1,069,588.00 COMM_Key
Chester East Marlborough Township
Unionville Community Park - Phase 2 -Development
BRC-PRD-19-76
$534,794.00 $250,000.00 19 Park Rehabilitation and Development (COMM)
$1,069,588.00 COMM_Key
Chester East Marlborough Township
Unionville Community Park - Phase 2 -Development
BRC-PRD-19-76
$534,794.00 $250,000.00 19 Park Rehabilitation and Development (COMM)
$1,069,588.00 COMM_Key
Chester East Marlborough Township
Unionville Community Park Master Site Plan
BRC-‐TAG-‐15-‐91
$27,500 $20,000 15 Master Site Plans (COMM)
$55,000 COMM_Key
Chester East Pikeland Township
French Creek Trail -‐ Phase 1 -‐ Development
BRC-‐PRD-‐17-‐117
$213,600 $213,600 17 Park Rehabilitation and Development (COMM)
$545,000 COMM_Key
Chester East Pikeland Township
Kimberton Community Park
KEY-‐PRD-‐3-‐55
$125,000 $100,000 3 Park Rehabilitation and Development (COMM)
$325,000 COMM_Key
Chester East Pikeland Township
Master Site Development Plan
KEY-‐TAG-‐1-‐43
$10,000 $10,000 1 Master Site Plans (COMM)
$20,000 COMM_Key
Chester East Vincent Township
Community Park KEY-‐ACQ-‐1-‐44
$99,000 $78,000 1 Acquisition (COMM)
$198,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 168 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Chester East Vincent Township
Francis Parcel Acquisition
BRC-‐ACQ-‐9-‐70
$69,400 $10,900 9 Acquisition (COMM)
$138,900 COMM_Key
Chester East Vincent Township
Reiff Tract Acquisition
BRC-‐ACQ-‐13-‐235
$912,500 $800,000 13 Acquisition (COMM)
$1,827,500 COMM_Key
Chester East Vincent Township
Veterans’ Center Park Master Site Plan
BRC-‐TAG-‐18-‐145
$30,837 $30,000 18 Master Site Plans (COMM)
$61,674 COMM_Key
Chester East Whiteland Township
Route 401 Site-‐Phase II
KEY-‐PRD-‐2-‐42
$45,000 $35,000 2 Park Rehabilitation and Development (COMM)
$180,000 COMM_Key
Chester Easttown Township O'Dell Tract -‐ Township Park
KEY-‐PRD-‐3-‐57
$330,000 $100,000 3 Park Rehabilitation and Development (COMM)
$660,000 COMM_Key
Chester Elverson Borough Livingood Park KEY-‐PRD-‐3-‐60
$50,000 $50,000 3 Park Rehabilitation and Development (COMM)
$136,000 COMM_Key
Chester Franklin Township Annand Acquisition (White Clay Greenway)
BRC-‐ACQ-‐14-‐56
$558,000 $500,000 14 Acquisition (COMM)
$1,116,000 COMM_Key
Chester Franklin Township Community Park-‐Phase I
KEY-‐PRD-‐2-‐51
$250,000 $210,000 2 Park Rehabilitation and Development (COMM)
$571,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 169 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Chester Franklin Township Goodwin Parcel South Acquisition-‐ White Clay Greenway
BRC-‐ACQ-‐13.3-‐276
$112,000 $112,000 13.3 Acquisition (COMM)
$224,000 COMM_Key
Chester Franklin Township Miller Property Acquisition
LWCF 42-‐01560
$1,288,750 $96,077 14 Acquisition (COMM)
$2,577,500 COMM_Key
Chester Franklin Township Trail Feasibility Study BRC-‐TAG-‐12-‐237
$19,000 $19,000 12 Feasibility Studies (COMM)
$38,000 COMM_Key
Chester French & Pickering Creeks Conservation Trust, Inc.
Desfor Easement (Pigeon Run Greenway)
BRC-‐LTA-‐13-‐514
$667,000 $500,000 13 Open Space Acquisition (LT)
$1,317,000 LT_Key
Chester French & Pickering Creeks Conservation Trust, Inc.
French Creek Road Project
BRC-‐LTA-‐7-‐27
$81,000 $96,000 7 Open Space Acquisition (LT)
$192,000 LT_Key
Chester French & Pickering Creeks Conservation Trust, Inc.
French Creek Trail BRC-‐RCI-‐8-‐4 $12,500 $12,000 8 Implementation (RIV)
$25,000 RIVER_Key
Chester French & Pickering Creeks Conservation Trust, Inc.
French Creek Trail Easement
BRC-‐LTA-‐11-‐10
$77,500 $75,000 11 Open Space Acquisition (LT)
$155,000 LT_Key
Chester French & Pickering Creeks Conservation Trust, Inc.
Marinucci Property BRC-‐LTA-‐6-‐10
$150,000 $120,000 6 Open Space Acquisition (LT)
$600,000 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 170 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Chester French & Pickering Creeks Conservation Trust, Inc.
Miller Marsh Project BRC-‐LTA-‐9-‐5
$52,200 $52,000 9 Open Space Acquisition (LT)
$105,000 LT_Key
Chester French & Pickering Creeks Conservation Trust, Inc.
Thorncroft Conservation Easement
BRC-‐LTA-‐17-‐53
$329,000 $329,000 17 Open Space Acquisition (LT)
$1,977,000 LT_Key
Chester French & Pickering Creeks Conservation Trust, Inc.
Weney Conservation Easement
BRC-‐LTA-‐13-‐515
$83,500 $60,400 13 Open Space Acquisition (LT)
$167,000 LT_Key
Chester Green Valleys Association of Southeastern PA
French & Pickering Creek Watershed Plan
KEY-‐RCP-‐95-‐08
$50,000 $50,000 1 Planning (RIV) $150,000 RIVER_Key
Chester Green Valleys Association of Southeastern PA
French Creek Streambank Reclamation
BRC-‐RCD-‐6-‐12
$44,500 $104,500 6 Development (RIV)
$209,000 RIVER_Key
Chester Green Valleys Association of Southeastern PA
Sustainable Municipal Watershed Management
BRC-‐RCI-‐9-‐8 $115,000 $29,000 9 Implementation (RIV)
$292,000 RIVER_Key
Chester Green Valleys Association of Southeastern PA
Watershed Mgmt. in Pigeon Creek & Stony
KEY-‐RCP-‐96-‐05
$42,300 $42,300 3 Planning (RIV) $84,600 RIVER_Key
Chester Kennett Area Park Authority
Park Addition KEY-‐ACQ-‐5-‐103
$45,000 $45,000 5 Acquisition (COMM)
$145,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 171 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Chester Kennett Square Borough
Red Clay Greenway Trail
BRC-‐PRD-‐9-‐108
$100,000 $50,000 9 Park Rehabilitation and Development (COMM)
$540,100 COMM_Key
Chester Kennett Township Kennett Pike Bikeway Study
BRC-‐TAG-‐12-‐240
$42,200 $42,000 12 Trail Study (COMM)
$97,400 COMM_Key
Chester Kennett Township Land Trust
Halsted/Melody Nature Preserve Acquisition
BRC-‐LTA-‐13.3-‐517
$750,000 $750,000 13.3 Open Space Acquisition (LT)
$4,024,400 LT_Key
Chester Kennett Township Land Trust
State Line Woods BRC-‐LTA-‐6-‐8
$222,000 $180,000 6 Critical Habitat Acquisition (LT)
$444,000 LT_Key
Chester Kennett Township Land Trust
Whittle Conservation Easement
BRC-‐LTA-‐13-‐21
$550,000 $450,000 13 Open Space Acquisition (LT)
$1,770,300 LT_Key
Chester London Britain Township
Mason-‐Dixon Greenway Master Site Plan -‐ South
BRC-‐TAG-‐8-‐106
$25,000 $25,000 8 Greenway Plans (COMM)
$52,800 COMM_Key
Chester London Britain Township
Mason-‐Dixon Greenway South Trail
BRC-‐PRD-‐13-‐118
$250,000 $250,000 13 Park Rehabilitation and Development (COMM)
$506,300 COMM_Key
Chester London Britain Township
Nichol Park KEY-‐PRD-‐3-‐116
$150,000 $100,000 3 Park Rehabilitation and Development (COMM)
$335,300 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 172 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Chester London Britain Township
Nichol Park Addition (Dehorty Acquisition)
BRC-‐ACQ-‐11.5-‐9
$199,000 $199,000 11.5 Acquisition (COMM)
$398,000 COMM_Key
Chester London Britain Township
Nichol Park Development -‐ Phase II
BRC-‐PRD-‐13.3-‐547
$153,000 $150,000 13.3 Park Rehabilitation and Development (COMM)
$306,500 COMM_Key
Chester London Britain Township
Nichol Park Expansion Project
BRC-‐TAG-‐13-‐190
$12,500 $12,500 13 Master Site Plans (COMM)
$25,000 COMM_Key
Chester London Britain Township
Schaer Easement BRC-‐ACQ-‐13.3-‐548
$258,063 $105,000 13.3 Acquisition (COMM)
$516,127 COMM_Key
Chester London Grove Township
Community Park BRC-‐PRD-‐13.3-‐386
$250,000 $250,000 13.3 Park Rehabilitation and Development (COMM)
$3,608,400 COMM_Key
Chester London Grove Township
Community Park Master Site Plan
BRC-‐TAG-‐11-‐218
$35,000 $35,000 11 Master Site Plans (COMM)
$70,000 COMM_Key
Chester London Grove Township
East Branch White Clay Creek Watershed
KEY-‐CHP-‐2-‐1
$5,000 $5,000 5 Coldwater Heritage Partnership
$5,000 RIVER_Key
Chester London Grove Township
Goddard Park -‐ Phase 2 -‐ Development
BRC-‐PRD-‐17-‐132
$250,000 $250,000 17 Park Rehabilitation and Development (COMM)
$572,494 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 173 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Chester London Grove Township
Goodwin Parcel North Acquisition -‐ (White Clay Greenway)
BRC-‐ACQ-‐13.3-‐280
$205,000 $150,000 13.3 Acquisition (COMM)
$410,000 COMM_Key
Chester Londonderry Township
Community Park KEY-‐ACQ-‐3-‐117
$45,000 $22,500 3 Acquisition (COMM)
$90,000 COMM_Key
Chester Natural Lands Trust, Inc.
Armstrong East Property Acquisition
BRC-‐LTA-‐11.5-‐4
$420,000 $420,000 11.5 Open Space Acquisition (LT)
$840,000 LT_Key
Chester Natural Lands Trust, Inc.
Birch Run Forest Preserve Project
BRC-‐RCA-‐9-‐12
$230,000 $200,000 9 Acquisition (RIV)
$432,000 RIVER_Key
Chester Natural Lands Trust, Inc.
Campus Conservation and Management Plan
BRC-‐LTP-‐15-‐127
$35,320 $30,000 15 Open Space Planning (LT)
$70,640 LT_Key
Chester Natural Lands Trust, Inc.
Crow's Nest Farm Preserve
KEY-‐LTA-‐1-‐7 $300,000 $200,000 1 Critical Habitat Acquisition (LT)
$800,000 LT_Key
Chester Natural Lands Trust, Inc.
Crow's Nest Preserve KEY-‐LTA-‐3-‐8 $147,250 $100,000 3 Open Space Acquisition (LT)
$250,000 LT_Key
Chester Natural Lands Trust, Inc.
Deborah's Rock Farm Preserve
KEY-‐LTA-‐1-‐8 $700,000 $275,000 1 Critical Habitat Acquisition (LT)
$875,000 LT_Key
Chester Natural Lands Trust, Inc.
Furlong Acquisition BRC-‐LTA-‐13.3-‐526
$121,000 $121,000 13.3 Open Space Acquisition (LT)
$254,900 LT_Key
Chester Natural Lands Trust, Inc.
Goat Hill Barrens KEY-‐LTA-‐3-‐9 $139,250 $75,000 3 Critical Habitat Acquisition (LT)
$150,000 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 174 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Chester Natural Lands Trust, Inc.
Goodwin Easement (Center Parcel) White Clay Creek
BRC-‐LTA-‐13.3-‐527
$173,500 $173,000 13.3 Open Space Acquisition (LT)
$347,000 LT_Key
Chester Natural Lands Trust, Inc.
Henderson Acquisition
BRC-‐LTA-‐18-‐14
$164,200 $154,000 18 Open Space Acquisition (LT)
$328,400 LT_Key
Chester Natural Lands Trust, Inc.
Kalb Easement BRC-‐LTA-‐13.3-‐528
$845,545 $284,395 13.3 Open Space Acquisition (LT)
$1,691,089 LT_Key
Chester Natural Lands Trust, Inc.
Karillian Property Acquisition
BRC-‐LTA-‐11-‐21
$137,500 $137,500 11 Open Space Acquisition (LT)
$275,000 LT_Key
Chester Natural Lands Trust, Inc.
Phelps/White Clay Creek Acquisition
BRC-‐LTA-‐8-‐10
$298,100 $298,000 8 Open Space Acquisition (LT)
$596,400 LT_Key
Chester Natural Lands Trust, Inc.
Sadsbury Woodlands KEY-‐LTA-‐1-‐9 $222,575 $175,000 1 Critical Habitat Acquisition (LT)
$400,000 LT_Key
Chester Natural Lands Trust, Inc.
Sadsbury Woodlands KEY-‐LTA-‐3-‐11
$126,500 $95,000 3 Critical Habitat Acquisition (LT)
$200,000 LT_Key
Chester Natural Lands Trust, Inc.
Sadsbury Woodlands KEY-‐LTA-‐4-‐12
$398,000 $375,000 4 Open Space Acquisition (LT)
$821,900 LT_Key
Chester Natural Lands Trust, Inc.
Schulz Property Acquisition
BRC-‐LTA-‐16-‐33
$75,000 $75,000 16 Open Space Acquisition (LT)
$287,515 LT_Key
Chester Natural Lands Trust, Inc.
Skiles Property Acquisition (Sadsbury Woods)
BRC-‐LTA-‐11-‐18
$37,500 $37,500 11 Open Space Acquisition (LT)
$75,000 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 175 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Chester Natural Lands Trust, Inc.
Sugartown Barrens & Woodlands Acquisition
BRC-‐LTA-‐8-‐11
$1,260,300 $750,000 8 Critical Habitat Acquisition (LT)
$5,902,500 LT_Key
Chester Natural Lands Trust, Inc.
Tavangar Land Acquisition
BRC-‐LTA-‐13.3-‐530
$536,000 $250,000 13.3 Open Space Acquisition (LT)
$1,072,300 LT_Key
Chester Natural Lands Trust, Inc.
Unionville Barrens Acquisition
BRC-‐LTA-‐12.5-‐10
$2,600,000 $1,500,000 12.5 Open Space Acquisition (LT)
$5,200,000 LT_Key
Chester New Garden Township
Greenways Plan BRC-‐TAG-‐13-‐199
$17,500 $17,500 13 Greenway Plans (COMM)
$35,000 COMM_Key
Chester New Garden Township
New Garden Park-‐ Phase I
BRC-‐PRD-‐14-‐157
$250,000 $188,000 14 Park Rehabilitation and Development (COMM)
$1,000,000 COMM_Key
Chester New London Township
Stanwell Land Acquisition
BRC-‐ACQ-‐17-‐97
$245,000 $163,500 17 Acquisition (COMM)
$490,000 COMM_Key
Chester Newlin Township Claffy Land Acquisition
BRC-‐ACQ-‐17-‐98
$43,300 $43,300 17 Acquisition (COMM)
$270,800 COMM_Key
Chester North Coventry Township
Baker Property Acquisition
BRC-‐ACQ-‐12.5-‐17
$365,000 $350,000 12.5 Acquisition (COMM)
$730,000 COMM_Key
Chester North Coventry Township
Bentley Acquisition (Coventry Woods)
BRC-‐ACQ-‐14-‐65
$875,000 $875,000 14 Acquisition (COMM)
$1,750,000 COMM_Key
Chester North Coventry Township
Coventry Woods - Andybur Acquisition
BRC-ACQ-19-13
$195,875.00 $195,000.00 19 Acquisition (COMM)
$391,750.00 COMM_Key
Chester North Coventry Township
Coventry Woods - Andybur Acquisition
BRC-ACQ-19-13
$195,875.00 $195,000.00 19 Acquisition (COMM)
$391,750.00 COMM_Key
Chester North Coventry Township
Coventry Woods - Andybur Acquisition
BRC-ACQ-19-13
$195,875.00 $195,000.00 19 Acquisition (COMM)
$391,750.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 176 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Chester North Coventry Township
Coventry Woods -‐ Phase IV(Salyor Property)
BRC-‐ACQ-‐11-‐182
$71,500 $71,500 11 Acquisition (COMM)
$143,000 COMM_Key
Chester North Coventry Township
Coventry Woods Acq.-‐ Phase II-‐-‐Brown/Barnard Properties
BRC-‐ACQ-‐9-‐150
$239,000 $205,000 9 Acquisition (COMM)
$410,000 COMM_Key
Chester North Coventry Township
Coventry Woods Acquisition-‐Nueva Esperanza Campground
BRC-‐ACQ-‐15-‐144
$390,000 $390,000 15 Acquisition (COMM)
$780,000 COMM_Key
Chester North Coventry Township
Coventry Woods, Phase 3
BRC-‐ACQ-‐10-‐187
$124,800 $120,000 10 Acquisition (COMM)
$249,600 COMM_Key
Chester North Coventry Township
Coventryside Property Acquisition (Schuylkill Highlands)
BRC-‐ACQ-‐18-‐7
$280,000 $259,300 18 Acquisition (COMM)
$568,600 COMM_Key
Chester North Coventry Township
Customers Bank Property Acquisition
BRC-ACQ-19-14
$90,530.00 $90,500.00 19 Acquisition (COMM)
$181,060.00 COMM_Key
Chester North Coventry Township
Customers Bank Property Acquisition
BRC-ACQ-19-14
$90,530.00 $90,500.00 19 Acquisition (COMM)
$181,060.00 COMM_Key
Chester North Coventry Township
Customers Bank Property Acquisition
BRC-ACQ-19-14
$90,530.00 $90,500.00 19 Acquisition (COMM)
$181,060.00 COMM_Key
Chester North Coventry Township
Hill School Acquisition (Coventry Woods) Phase X
BRC-‐ACQ-‐14-‐66
$850,000 $460,000 14 Acquisition (COMM)
$1,700,000 COMM_Key
Chester North Coventry Township
Hurchalla Property Acquisition -‐ Coventry Woods
BRC-‐ACQ-‐16-‐24
$430,000 $300,000 16 Acquisition (COMM)
$860,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 177 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Chester North Coventry Township
Nueva Esperanza Property Acquisition
BRC-‐ACQ-‐12-‐62
$426,000 $426,000 12 Acquisition (COMM)
$852,000 COMM_Key
Chester North Coventry Township
O'Connor Property Acquisition
BRC-‐ACQ-‐17-‐232
$201,700 $150,000 17 Acquisition (COMM)
$403,400 COMM_Key
Chester North Coventry Township
Schuylkill Highlands North Coventry Trail-‐ Coventry Heights
BRC-‐ACQ-‐15-‐46
$140,000 $140,000 15 Acquisition (COMM)
$280,000 COMM_Key
Chester North Coventry Township
Shaner/Kauffman Properties
BRC-‐ACQ-‐13-‐236
$55,000 $55,000 13 Acquisition (COMM)
$110,000 COMM_Key
Chester Octorara Community Recreation Commission
Circuit Rider BRC-‐TAG-‐7-‐7
$41,200 $63,400 7 Circuit Rider (COMM)
$124,200 COMM_Key
Chester Open Land Conservancy of Chester County
Barrett Land Acquisition -‐ (Diamond Rock Preserve Addition)
BRC-‐LTA-‐13.6-‐614
$194,400 $194,400 13.6 Open Space Acquisition (LT)
$389,800 LT_Key
Chester Open Land Conservancy of Chester County
Valley Creek Addition
KEY-‐LTA-‐3-‐18
$101,885 $80,000 3 Open Space Acquisition (LT)
$200,000 LT_Key
Chester Oxford Area Recreation Authority
Gray Farm Master Site Plan
BRC-‐TAG-‐10-‐162
$20,000 $20,000 10 Master Site Plans (COMM)
$40,000 COMM_Key
Chester Oxford Area Recreation Authority
Oxford Area Regional Park
BRC-‐PRD-‐13-‐132
$200,000 $200,000 13 Park Rehabilitation and Development (COMM)
$500,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 178 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Chester Oxford Borough Moran Tract-‐-‐-‐-‐(old)Gray Property Acquisition
BRC-‐ACQ-‐6-‐135
$250,000 $250,000 6 Acquisition (COMM)
$1,016,000 COMM_Key
Chester Oxford Borough Oxford Memorial Park
KEY-‐SC-‐2-‐114
$20,000 $20,000 2 Small Communities/Small Projects (COMM)
$22,500 COMM_Key
Chester Parkesburg Borough Hery Tract Acquisition
BRC-‐ACQ-‐8-‐146
$72,250 $72,000 8 Acquisition (COMM)
$144,500 COMM_Key
Chester Parkesburg Borough Hodge Property KEY-‐ACQ-‐4-‐122
$51,000 $51,000 4 Acquisition (COMM)
$102,000 COMM_Key
Chester Parkesburg Borough Minch Park BRC-‐PRD-‐7-‐147
$100,000 $100,000 7 Park Rehabilitation and Development (COMM)
$200,000 COMM_Key
Chester Penn Township Penn Park Master Site Plan
BRC-‐TAG-‐13.3-‐484
$62,500 $40,000 13.3 Master Site Plans (COMM)
$125,000 COMM_Key
Chester Penn Township Penn Township Community Park
BRC-‐PRD-‐7-‐151
$250,000 $100,000 7 Park Rehabilitation and Development (COMM)
$647,000 COMM_Key
Chester Penn Township Penn Township Community Park
BRC-‐TAG-‐6-‐140
$12,750 $12,700 6 Master Site Plans (COMM)
$25,500 COMM_Key
Chester Pennsbury Land Trust, Inc.
Haskell Property Easement
BRC-‐LTA-‐8-‐13
$194,484 $190,000 8 Critical Habitat Acquisition (LT)
$1,290,734 LT_Key
Chester Pennsbury Township Master Site Plan BRC-‐TAG-‐6-‐142
$9,600 $9,600 6 Master Site Plans (COMM)
$19,200 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 179 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Chester Pennsbury Township Park and Open Space Land
KEY-‐ACQ-‐3-‐165
$185,000 $100,000 3 Acquisition (COMM)
$860,000 COMM_Key
Chester Pennsylvania Environmental Council, Inc.
Ridley Creek Riparian & Streambank Restoration
BRC-‐RCI-‐6-‐11
$19,500 $19,500 6 Implementation (RIV)
$40,100 RIVER_Key
Chester Phoenix Iron Canal & Trails Association
Feasibility Study KEY-‐RTP-‐95-‐24
$7,500 $7,500 1 Feasibility Studies (RT)
$15,000 RT_Key
Chester Phoenixville Borough
Community Park Acq.
BRC-‐ACQ-‐8-‐154
$495,000 $400,000 8 Acquisition (COMM)
$1,050,000 COMM_Key
Chester Phoenixville Borough
Five Sites KEY-‐PRD-‐5-‐162
$29,200 $49,200 5 Park Rehabilitation and Development (COMM)
$72,900 COMM_Key
Chester Phoenixville Borough
Melchiorre Tract Park MSDP
BRC-‐TAG-‐10-‐165
$12,500 $12,500 10 Master Site Plans (COMM)
$25,000 COMM_Key
Chester Phoenixville Borough
Park Master Site Plans
BRC-‐TAG-‐7-‐155
$30,000 $30,000 7 Master Site Plans (COMM)
$60,000 COMM_Key
Chester Phoenixville Borough
Thornton Park BRC-‐PRD-‐12-‐188
$163,400 $60,000 12 Park Rehabilitation and Development (COMM)
$326,800 COMM_Key
Chester Phoenixville Borough
Twelve Sites KEY-‐PRD-‐2-‐123
$105,866 $100,000 2 Park Rehabilitation and Development (COMM)
$289,666 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 180 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Chester Pocopson Township Community Trail Feasibility Study
BRC-‐TAG-‐11-‐72
$135,000 $14,000 11 Trail Study (COMM)
$433,000 COMM_Key
Chester Sadsbury Township Bert Reel Park KEY-‐SC-‐5-‐175
$19,970 $20,000 5 Small Communities/Small Projects (COMM)
$19,970 COMM_Key
Chester Sadsbury Township Bert Reel Park Renovation
BRC-‐PRD-‐12-‐195
$60,600 $60,000 12 Park Rehabilitation and Development (COMM)
$121,300 COMM_Key
Chester Sadsbury Township Sadsburyville Playground
KEY-‐ACQ-‐1-‐119
$20,450 $20,000 1 Acquisition (COMM)
$40,900 COMM_Key
Chester Schuylkill River Greenway Association
SRT-‐Thun Trail Section Pedestrian Bridge
BRC-‐RCD-‐7-‐16
$250,000 $175,000 7 Development (RIV)
$500,000 RIVER_Key
Chester Schuylkill Township Valley Park Development
BRC-‐RCD-‐16-‐178
$116,400 $116,000 16 Development (RIV)
$232,801 COMM_Key
Chester South Coventry Township
Pughtown Partnership Project
BRC-‐ACQ-‐6-‐170
$325,000 $250,000 6 Acquisition (COMM)
$700,150 COMM_Key
Chester South Coventry Township
Town Forest Addition
KEY-‐ACQ-‐1-‐129
$26,290 $26,000 1 Acquisition (COMM)
$102,580 COMM_Key
Chester South Coventry Township
Woody's Woods Master Site and Conservation Plan
BRC-‐TAG-‐14-‐241
$21,900 $21,900 14 Master Site Plans (COMM)
$43,800 COMM_Key
Chester South Coventry Township
Woody's Woods Open Space Acquisition
BRC-‐ACQ-‐11-‐186
$70,000 $70,000 11 Acquisition (COMM)
$140,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 181 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Chester The Nature Conservancy
Chrome Barrens KEY-‐LTA-‐3-‐15
$106,250 $100,000 3 Critical Habitat Acquisition (LT)
$200,000 LT_Key
Chester The Nature Conservancy
Goat Hill Barrens KEY-‐LTA-‐2-‐7 $137,500 $136,000 2 Critical Habitat Acquisition (LT)
$272,000 LT_Key
Chester The Nature Conservancy
Nottingham Barrens KEY-‐LTA-‐2-‐10
$72,500 $65,000 2 Critical Habitat Acquisition (LT)
$130,000 LT_Key
Chester The Wallace Trust Guerra Property Acquisition
BRC-‐LTA-‐8-‐19
$102,300 $100,000 8 Critical Habitat Acquisition (LT)
$240,500 LT_Key
Chester The Wallace Trust Hannum Acquisition BRC-‐LTA-‐18-‐18
$39,000 $27,500 18 Open Space Acquisition (LT)
$78,000 LT_Key
Chester Thornbury Township Dallett Tract KEY-‐ACQ-‐2-‐154
$200,000 $175,000 2 Acquisition (COMM)
$600,000 COMM_Key
Chester Thornbury Township Spackman Tract KEY-‐ACQ-‐5-‐201
$290,000 $140,000 5 Acquisition (COMM)
$666,000 COMM_Key
Chester Thornbury Township Squire Cheyney Park-‐ Phase 1-‐ Development
BRC-‐PRD-‐17-‐154
$207,000 $200,000 17 Park Rehabilitation and Development (COMM)
$414,000 COMM_Key
Chester Thornbury Township Squire Cheyney Pk/Waln Run Pk. Master Site Plans
BRC-‐TAG-‐11-‐235
$30,000 $30,000 11 Master Site Plans (COMM)
$60,000 COMM_Key
Chester Tredyffrin Township Comp. Rec., Park and Open Space Plan
BRC-‐TAG-‐8-‐191
$26,200 $26,000 8 Comp. Rec., Park, & Open Space Plans (COMM)
$52,500 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 182 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Chester Tredyffrin Township West Swedesford Road Greenways Acquisition
BRC-‐ACQ-‐10-‐196
$200,000 $200,000 10 Acquisition (COMM)
$800,000 COMM_Key
Chester Tredyffrin Township Westover Builders Property Acquisition
BRC-‐ACQ-‐8-‐192
$100,000 $100,000 8 Acquisition (COMM)
$720,000 COMM_Key
Chester Tredyffrin Township Westover Park Master Site Plan
BRC-‐TAG-‐10-‐173
$21,600 $20,000 10 Master Site Plans (COMM)
$43,100 COMM_Key
Chester Tredyffrin Township Wilson Tract KEY-‐ACQ-‐3-‐221
$200,000 $100,000 3 Acquisition (COMM)
$2,700,000 COMM_Key
Chester Upper Oxford Township
Stankywicz Estate Acquisition
BRC-‐ACQ-‐11-‐188
$104,000 $104,000 11 Acquisition (COMM)
$423,000 COMM_Key
Chester Upper Uwchlan Township
Community-‐wide Trail Network Feasibility Study
BRC-‐TAG-‐8-‐204
$31,200 $30,000 8 Trail Study (COMM)
$67,400 COMM_Key
Chester Upper Uwchlan Township
Hickory Park KEY-‐PRD-‐4-‐157
$25,000 $25,000 4 Park Rehabilitation and Development (COMM)
$50,000 COMM_Key
Chester Uwchlan Township Walking Trail KEY-‐PRD-‐2-‐161
$100,000 $100,000 2 Park Rehabilitation and Development (COMM)
$433,800 COMM_Key
Chester Valley Township Comprehensive Recreation, Open Space and Greenway Plan
BRC-‐TAG-‐16-‐74
$20,000 $20,000 16 Comp. Rec., Park, & Open Space Plans (COMM)
$40,000 COMM_Key
Chester Wallace Township Community Park KEY-‐ACQ-‐4-‐163
$125,000 $100,000 4 Acquisition (COMM)
$570,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 183 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Chester Wallace Township Community Park Master Site Plan
KEY-‐TAG-‐5-‐210
$20,625 $20,600 5 Master Site Plans (COMM)
$41,250 COMM_Key
Chester Wallace Township Wagenseller Park KEY-‐SC-‐1-‐142
$7,120 $7,100 1 Small Communities/Small Projects (COMM)
$11,200 COMM_Key
Chester West Bradford Township
Broad Run Park KEY-‐PRD-‐3-‐230
$559,000 $100,000 3 Park Rehabilitation and Development (COMM)
$1,118,000 COMM_Key
Chester West Bradford Township
East Branch Brandywine Trail
BRC-‐PRD-‐14-‐181
$100,000 $100,000 14 Park Rehabilitation and Development (COMM)
$1,653,400 COMM_Key
Chester West Bradford Township
Lammey Park Master Plan
KEY-‐TAG-‐1-‐145
$10,950 $10,900 1 Master Site Plans (COMM)
$21,900 COMM_Key
Chester West Bradford Township
Shadyside Park BRC-‐PRD-‐7-‐206
$200,000 $100,000 7 Park Rehabilitation and Development (COMM)
$1,368,335 COMM_Key
Chester West Brandywine Township
Master Site Development Plan
KEY-‐TAG-‐3-‐231
$10,000 $10,000 3 Master Site Plans (COMM)
$20,000 COMM_Key
Chester West Brandywine Township
Municipal Park KEY-‐ACQ-‐2-‐170
$105,750 $70,000 2 Acquisition (COMM)
$289,800 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 184 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Chester West Brandywine Township
West Brandywine Township Community Park
BRC-‐PRD-‐7-‐207
$261,315 $100,000 7 Park Rehabilitation and Development (COMM)
$782,580 COMM_Key
Chester West Caln Township Layton Property KEY-‐ACQ-‐5-‐220
$150,000 $150,000 5 Acquisition (COMM)
$700,000 COMM_Key
Chester West Chester Borough
John O. Green Park -‐ Phase 2
BRC-‐PRD-‐11-‐98
$48,800 $48,000 11 Park Rehabilitation and Development (COMM)
$97,600 COMM_Key
Chester West Chester Borough
Park Improvements -‐ Seven Sites
KEY-‐PRD-‐1-‐146
$36,490 $36,400 1 Park Rehabilitation and Development (COMM)
$72,990 COMM_Key
Chester West Chester Borough
PECO Property Tot Lot
KEY-‐PRD-‐4-‐167
$112,800 $100,000 4 Park Rehabilitation and Development (COMM)
$257,800 COMM_Key
Chester West Fallowfield Township
Octorara Area Reg. Rec. Circuit Rider -‐ Year 1
KEY-‐TAG-‐5-‐222
$40,000 $40,000 5 Circuit Rider (COMM)
$40,000 COMM_Key
Chester West Fallowfield Township
Peer-‐to-‐Peer KEY-‐TAG-‐4-‐168
$7,500 $7,500 4 Peer-‐to-‐Peer Tech. Assistance (COMM)
$8,400 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 185 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Chester West Goshen Township
Community Park -‐ Phase I
KEY-‐PRD-‐1-‐147
$182,495 $100,000 1 Park Rehabilitation and Development (COMM)
$667,245 COMM_Key
Chester West Goshen Township
Freedley Field KEY-‐ACQ-‐4-‐169
$90,000 $50,000 4 Acquisition (COMM)
$180,000 COMM_Key
Chester West Grove Borough Memorial Park KEY-‐SC-‐5-‐223
$20,000 $20,000 5 Small Communities/Small Projects (COMM)
$23,986 COMM_Key
Chester West Nantmeal Township
Township Park -‐ Development
BRC-‐SC-‐17-‐50
$40,000 $40,000 17 Small Communities/Small Projects (COMM)
$70,400 COMM_Key
Chester West Pikeland Township
Opperman's Corner Acquisition
BRC-ACQ-19-17
########## ########## 19 Acquisition (COMM)
$5,232,200.00 COMM_Key
Chester West Pikeland Township
Opperman's Corner Acquisition
BRC-ACQ-19-17
########## ########## 19 Acquisition (COMM)
$5,232,200.00 COMM_Key
Chester West Pikeland Township
Opperman's Corner Acquisition
BRC-ACQ-19-17
########## ########## 19 Acquisition (COMM)
$5,232,200.00 COMM_Key
Chester West Sadsbury Township
Zion Hill & Zook Roads Acquisition
BRC-‐ACQ-‐9-‐231
$121,200 $110,000 9 Acquisition (COMM)
$242,300 COMM_Key
Chester West Whiteland Township
Exton Park Master Site Plan Update
BRC-TAG-19-209
$39,602.50 $33,000.00 19 Master Site Plans (COMM)
$79,205.00 COMM_Key
Chester West Whiteland Township
Exton Park Master Site Plan Update
BRC-TAG-19-209
$39,602.50 $33,000.00 19 Master Site Plans (COMM)
$79,205.00 COMM_Key
Chester West Whiteland Township
Exton Park Master Site Plan Update
BRC-TAG-19-209
$39,602.50 $33,000.00 19 Master Site Plans (COMM)
$79,205.00 COMM_Key
Chester White Clay Watershed Association
Mason Dixon Greenway Study
KEY-‐LTP-‐2-‐15
$1,250 $1,200 2 Open Space Planning (LT)
$2,400 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 186 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Chester White Clay Watershed Association
White Clay Creek Watershed Cons. Plan
KEY-‐RCP-‐95-‐19
$10,100 $10,100 1 Planning (RIV) $20,200 RIVER_Key
Chester Willistown Conservation Trust, Inc.
Ashbridge Preserve Acquisition
BRC-‐LTA-‐8-‐21
$1,650,000 $1,350,000 8 Critical Habitat Acquisition (LT)
$3,300,000 LT_Key
Chester Willistown Conservation Trust, Inc.
Kirkwood Preserve Acquisition
BRC-‐LTA-‐11-‐28
$750,000 $500,000 11 Open Space Acquisition (LT)
$5,038,000 LT_Key
Chester Willistown Conservation Trust, Inc.
Penns Preserve Park renamed: Okehocking Preserve
BRC-‐LTA-‐7-‐26
$750,000 $750,000 7 Open Space Acquisition (LT)
$1,825,940 LT_Key
Chester Willistown Conservation Trust, Inc.
Rushton Woods Preserve Addition Land Acquisition
BRC-‐LTA-‐15-‐125
$1,679,220 $500,000 15 Open Space Acquisition (LT)
$4,550,000 LT_Key
Chester Willistown Conservation Trust, Inc.
White Farmhouse Parcel Acquisition
BRC-LTA-19-33
$137,500.00 $137,500.00 19 Open Space Acquisition (LT)
$705,000.00 LT_Key
Chester Willistown Conservation Trust, Inc.
White Farmhouse Parcel Acquisition
BRC-LTA-19-33
$137,500.00 $137,500.00 19 Open Space Acquisition (LT)
$705,000.00 LT_Key
Chester Willistown Conservation Trust, Inc.
White Farmhouse Parcel Acquisition
BRC-LTA-19-33
$137,500.00 $137,500.00 19 Open Space Acquisition (LT)
$705,000.00 LT_Key
Chester Willistown Township Okehocking Nature Center
BRC-‐TAG-‐13-‐211
$52,000 $52,000 13 Feasibility Studies (COMM)
$106,300 COMM_Key
Chester Willistown Township Okehocking Preserve -‐ Phase 3 Acquisition
BRC-‐ACQ-‐11.5-‐16
$500,000 $500,000 11.5 Acquisition (COMM)
$1,500,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 187 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Chester Willistown Township Okehocking Preserve Management Plan
BRC-‐TAG-‐8-‐220
$19,700 $19,000 8 Conservation/Sound Land Use (COMM)
$39,500 COMM_Key
Chester, Delaware
Chester-‐Ridley-‐Crum Watersheds Association
Crum Creek Watershed Conservation Plan
BRC-‐RCP-‐9-‐5
$79,500 $70,000 9 Planning (RIV) $159,100 RIVER_Key
Chester, Delaware
Pennsylvania Environmental Council, Inc.
Chester Creek Watershed Plan
KEY-‐RCP-‐96-‐01
$60,000 $60,000 3 Planning (RIV) $120,000 RIVER_Key
Chester, Delaware, Montgomery
Natural Lands Trust, Inc.
Preserve Recreation Planning Project
BRC-‐LTP-‐12.5-‐16
$55,000 $50,000 12.5 Open Space Planning (LT)
$154,900 LT_Key
Chester, Montgomery
Pottstown Metropolitan Regional Planning Committee
Pottstown Region Parks 2013 Mini-‐Grants
BRC-‐SR-‐18-‐131
$100,000 $100,000 18 Partnerships Projects
$200,000 COMM_Key
Clarion Allegheny Valley Trails Association
Allegheny River Trail Extension -‐ Foxburg to Parker
BRC-‐RTD-‐13-‐11
$300,000 $300,000 13 Rail Rehabilitation and Development (RT)
$600,000 RT_Key
Clarion Allegheny Valley Trails Association
Foxburg to Parker Rail-‐Trail Gap Acquisition
BRC-‐RTA-‐13.3-‐15
$58,000 $58,000 13.3 Acquisition (RT) $116,000 RT_Key
Clarion Armstrong County Conservancy Charitable Trust
McCandless Land Acquisition
BRC-‐LTA-‐13.6-‐608
$112,900 $112,000 13.6 Open Space Acquisition (LT)
$225,700 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 188 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Clarion Clarion Borough Clarion Borough 2007 Rec, Park & Open Space Plan and Pool FS
BRC-‐TAG-‐13.3-‐262
$30,000 $30,000 13.3 Comp. Rec., Park, & Open Space Plans (COMM)
$60,000 COMM_Key
Clarion Clarion Borough Clarion Borough Municipal Pool Development
BRC-PRD-19-68
$35,235.00 $35,200.00 19 Park Rehabilitation and Development (COMM)
$70,470.00 COMM_Key
Clarion Clarion Borough Clarion Borough Municipal Pool Development
BRC-PRD-19-68
$35,235.00 $35,200.00 19 Park Rehabilitation and Development (COMM)
$70,470.00 COMM_Key
Clarion Clarion Borough Clarion Borough Municipal Pool Development
BRC-PRD-19-68
$35,235.00 $35,200.00 19 Park Rehabilitation and Development (COMM)
$70,470.00 COMM_Key
Clarion Clarion Borough Comprehensive Recreation & Park Plan
KEY-‐TAG-‐1-‐31
$7,000 $7,000 1 Comp. Rec., Park, & Open Space Plans (COMM)
$14,500 COMM_Key
Clarion Clarion Borough Toby Boat Launch Area
BRC-‐PRD-‐14-‐127
$212,400 $55,700 14 Park Rehabilitation and Development (COMM)
$424,700 COMM_Key
Clarion Clarion Borough Weaver Community Park
KEY-‐PRD-‐4-‐30
$50,000 $50,000 4 Park Rehabilitation and Development (COMM)
$111,759 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 189 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Clarion Clarion County Community Park BRC-‐PRD-‐7-‐37
$55,000 $50,000 7 Park Rehabilitation and Development (COMM)
$110,000 COMM_Key
Clarion Clarion County Kids Court Playground
BRC-‐PRD-‐6-‐39
$11,000 $11,000 6 Park Rehabilitation and Development (COMM)
$22,000 COMM_Key
Clarion Clarion County Park Lighting BRC-‐PRD-‐12-‐138
$33,400 $33,400 12 Park Rehabilitation and Development (COMM)
$66,900 COMM_Key
Clarion Clarion Township Clarion Township/C-‐L School Playground Enhancement
BRC-‐SC-‐8-‐42
$30,000 $30,000 8 Small Communities/Small Projects (COMM)
$40,000 COMM_Key
Clarion East Brady Borough Community Park Skate Park
BRC-‐SC-‐12-‐91
$40,000 $40,000 12 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Clarion East Brady Borough East Brady Playground
BRC-‐SC-‐11-‐116
$24,100 $24,100 11 Small Communities/Small Projects (COMM)
$28,400 COMM_Key
Clarion East Brady Borough East Brady Recreation Complex -‐ Phase 4-‐ Development
BRC-‐SC-‐18-‐28
$40,000 $40,000 18 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 190 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Clarion East Brady Borough East Brady Recreation Complex- Phase 5- Development
BRC-SC-19-39
$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)
$60,001.00 COMM_Key
Clarion East Brady Borough East Brady Recreation Complex- Phase 5- Development
BRC-SC-19-39
$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)
$60,001.00 COMM_Key
Clarion East Brady Borough East Brady Recreation Complex- Phase 5- Development
BRC-SC-19-39
$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)
$60,001.00 COMM_Key
Clarion East Brady Borough Feasibility Study KEY-‐TAG-‐1-‐39
$9,775 $9,700 1 Feasibility Studies (COMM)
$19,550 COMM_Key
Clarion East Brady Borough Playground BRC-‐PRD-‐9-‐66
$59,200 $40,000 9 Park Rehabilitation and Development (COMM)
$118,400 COMM_Key
Clarion Farmington Township
Community Park Complex
BRC-‐ACQ-‐6-‐64
$47,200 $47,000 6 Acquisition (COMM)
$145,400 COMM_Key
Clarion Farmington Township
Community Park Complex
BRC-‐TAG-‐7-‐72
$20,000 $20,000 7 Master Site Plans (COMM)
$40,000 COMM_Key
Clarion Farmington Township
Community Park Development
BRC-‐PRD-‐12-‐55
$100,000 $100,000 12 Park Rehabilitation and Development (COMM)
$200,000 COMM_Key
Clarion Limestone Township Limestone Township Playground
BRC-‐SC-‐9-‐118
$20,000 $21,000 9 Small Communities/Small Projects (COMM)
$24,300 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 191 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Clarion Paint Township Community Flower Garden
KEY-‐SC-‐5-‐154
$10,600 $10,000 5 Small Communities/Small Projects (COMM)
$19,992 COMM_Key
Clarion Penn Soil Conservancy Charitable Trust
Scrubgrass Creek Watershed
KEY-‐RCP-‐96-‐16
$30,000 $30,000 3 Planning (RIV) $60,000 RIVER_Key
Clarion Perry Township David Wetzel Memorial Park
BRC-‐SC-‐13.3-‐315
$21,100 $21,000 13.3 Small Communities/Small Projects (COMM)
$38,200 COMM_Key
Clarion Perry Township David Wetzel Memorial Park and Ballfield
BRC-‐SC-‐11-‐147
$25,600 $25,000 11 Small Communities/Small Projects (COMM)
$31,100 COMM_Key
Clarion Redbank Valley Park Authority
Peer to Peer KEY-‐TAG-‐3-‐183
$6,750 $6,750 3 Peer-‐to-‐Peer Tech. Assistance (COMM)
$7,500 COMM_Key
Clarion Redbank Valley Park Authority
Redbank Valley Park KEY-‐PRD-‐3-‐182
$15,000 $15,000 3 Park Rehabilitation and Development (COMM)
$30,000 COMM_Key
Clarion Redbank Valley Park Commission
Circuit Rider BRC-‐TAG-‐10-‐200
$12,832 $12,800 10 Circuit Rider (COMM)
$39,600 COMM_Key
Clarion Redbank Valley Park Commission
Circuit Rider KEY-‐TAG-‐6-‐4
$30,000 $30,000 6 Circuit Rider (COMM)
$30,000 COMM_Key
Clarion Redbank Valley Park Commission
Master Site Plan & Feasibility Study
BRC-‐TAG-‐13-‐202
$12,500 $12,500 13 Master Site Plans (COMM)
$25,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 192 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Clarion Redbank Valley Park Commission
Municipal Park BRC-‐PRD-‐10-‐135
$28,700 $28,700 10 Park Rehabilitation and Development (COMM)
$37,400 COMM_Key
Clarion Redbank Valley Park Commission
Redbank Valley Municipal Park
BRC-‐PRD-‐13.3-‐420
$60,200 $60,200 13.3 Park Rehabilitation and Development (COMM)
$120,400 COMM_Key
Clarion Salem Township Park Expansion KEY-‐ACQ-‐4-‐132
$17,475 $17,000 4 Acquisition (COMM)
$34,950 COMM_Key
Clarion Sligo Borough Recreation Center BRC-‐PRD-‐10-‐137
$119,400 $100,000 10 Park Rehabilitation and Development (COMM)
$238,710 COMM_Key
Clarion Sligo Borough Recreation Center Renovation
BRC-‐SC-‐9-‐188
$37,600 $380,000 9 Small Communities/Small Projects (COMM)
$55,300 COMM_Key
Clarion Sligo Borough Save the Pool Project BRC-‐TAG-‐8-‐177
$7,500 $7,500 8 Feasibility Studies (COMM)
$15,000 COMM_Key
Clarion St. Petersburg Borough
Borough Park KEY-‐SC-‐5-‐190
$17,659 $17,700 5 Small Communities/Small Projects (COMM)
$21,759 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 193 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Clarion St. Petersburg Borough
St. Petersburg Park BRC-‐SC-‐8-‐187
$30,000 $30,000 8 Small Communities/Small Projects (COMM)
$40,000 COMM_Key
Clarion Strattanville Borough
Magic Square Park KEY-‐SC-‐3-‐208
$15,000 $15,000 3 Small Communities/Small Projects (COMM)
$22,000 COMM_Key
Clarion Union Area Council of Governments
Union COG-‐ Sligo Pool
BRC-‐PRD-‐14-‐25
$70,000 $30,000 14 Park Rehabilitation and Development (COMM)
$140,000 COMM_Key
Clarion, Crawford, Erie, Forest, Lawrence, Mercer, Venango, Warren
Northwest Pennsylvania Regional Planning & Development Commission
Northwest PA Greenway Plan Implementation 2014
BRC-SR-19-178
$150,000.00 $100,000.00 19 Partnerships Projects
$450,000.00 COMM_Key
Clarion, Crawford, Erie, Forest, Lawrence, Mercer, Venango, Warren
Northwest Pennsylvania Regional Planning & Development Commission
Northwest PA Greenway Plan Implementation 2014
BRC-SR-19-178
$150,000.00 $100,000.00 19 Partnerships Projects
$450,000.00 COMM_Key
Clarion, Crawford, Erie, Forest, Lawrence, Mercer, Venango, Warren
Northwest Pennsylvania Regional Planning & Development Commission
Northwest PA Greenway Plan Implementation 2014
BRC-SR-19-178
$150,000.00 $100,000.00 19 Partnerships Projects
$450,000.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 194 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Clarion, Crawford, Erie, Forest, Lawrence, Mercer, Venango, Warren
Northwest Pennsylvania Regional Planning & Development Commission
Northwest PA Greenway Plan Implementation 2014
BRC-SR-19-178
$150,000.00 $100,000.00 19 Partnerships Projects
$450,000.00 COMM_Key
Clarion, Crawford, Erie, Forest, Lawrence, Mercer, Venango, Warren
Northwest Pennsylvania Regional Planning & Development Commission
Northwest PA Greenway Plan Implementation 2014
BRC-SR-19-178
$150,000.00 $100,000.00 19 Partnerships Projects
$450,000.00 COMM_Key
Clarion, Crawford, Erie, Forest, Lawrence, Mercer, Venango, Warren
Northwest Pennsylvania Regional Planning & Development Commission
Northwest PA Greenway Plan Implementation 2014
BRC-SR-19-178
$150,000.00 $100,000.00 19 Partnerships Projects
$450,000.00 COMM_Key
Clarion, Crawford, Erie, Forest, Lawrence, Mercer, Venango, Warren
Northwest Pennsylvania Regional Planning & Development Commission
Northwest PA Greenway Plan Implementation 2014
BRC-SR-19-178
$150,000.00 $100,000.00 19 Partnerships Projects
$450,000.00 COMM_Key
Clarion, Crawford, Erie, Forest, Lawrence, Mercer, Venango, Warren
Northwest Pennsylvania Regional Planning & Development Commission
Northwest PA Greenway Plan Implementation 2014
BRC-SR-19-178
$150,000.00 $100,000.00 19 Partnerships Projects
$450,000.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 195 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Clarion, Crawford, Erie, Forest, Lawrence, Mercer, Venango, Warren
Northwest Pennsylvania Regional Planning & Development Commission
Northwest PA Greenway Plan Implementation 2014
BRC-SR-19-178
$150,000.00 $100,000.00 19 Partnerships Projects
$450,000.00 COMM_Key
Clarion, Crawford, Erie, Forest, Lawrence, Mercer, Venango, Warren
Northwest Pennsylvania Regional Planning & Development Commission
Northwest PA Greenway Plan Implementation 2014
BRC-SR-19-178
$150,000.00 $100,000.00 19 Partnerships Projects
$450,000.00 COMM_Key
Clarion, Crawford, Erie, Forest, Lawrence, Mercer, Venango, Warren
Northwest Pennsylvania Regional Planning & Development Commission
Northwest PA Greenway Plan Implementation 2014
BRC-SR-19-178
$150,000.00 $100,000.00 19 Partnerships Projects
$450,000.00 COMM_Key
Clarion, Crawford, Erie, Forest, Lawrence, Mercer, Venango, Warren
Northwest Pennsylvania Regional Planning & Development Commission
Northwest PA Greenway Plan Implementation 2014
BRC-SR-19-178
$150,000.00 $100,000.00 19 Partnerships Projects
$450,000.00 COMM_Key
Clarion, Crawford, Erie, Forest, Lawrence, Mercer, Venango, Warren
Northwest Pennsylvania Regional Planning & Development Commission
Northwest PA Greenway Plan Implementation 2014
BRC-SR-19-178
$150,000.00 $100,000.00 19 Partnerships Projects
$450,000.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 196 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Clarion, Crawford, Erie, Forest, Lawrence, Mercer, Venango, Warren
Northwest Pennsylvania Regional Planning & Development Commission
Northwest PA Greenway Plan Implementation 2014
BRC-SR-19-178
$150,000.00 $100,000.00 19 Partnerships Projects
$450,000.00 COMM_Key
Clarion, Crawford, Erie, Forest, Lawrence, Mercer, Venango, Warren
Northwest Pennsylvania Regional Planning & Development Commission
Northwest PA Greenway Plan Implementation 2014
BRC-SR-19-178
$150,000.00 $100,000.00 19 Partnerships Projects
$450,000.00 COMM_Key
Clarion, Crawford, Erie, Forest, Lawrence, Mercer, Venango, Warren
Northwest Pennsylvania Regional Planning & Development Commission
Northwest PA Greenway Plan Implementation 2014
BRC-SR-19-178
$150,000.00 $100,000.00 19 Partnerships Projects
$450,000.00 COMM_Key
Clarion, Crawford, Erie, Forest, Lawrence, Mercer, Venango, Warren
Northwest Pennsylvania Regional Planning & Development Commission
Northwest PA Greenway Plan Implementation 2014
BRC-SR-19-178
$150,000.00 $100,000.00 19 Partnerships Projects
$450,000.00 COMM_Key
Clarion, Crawford, Erie, Forest, Lawrence, Mercer, Venango, Warren
Northwest Pennsylvania Regional Planning & Development Commission
Northwest PA Greenway Plan Implementation 2014
BRC-SR-19-178
$150,000.00 $100,000.00 19 Partnerships Projects
$450,000.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 197 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Clarion, Crawford, Erie, Forest, Lawrence, Mercer, Venango, Warren
Northwest Pennsylvania Regional Planning & Development Commission
Northwest PA Greenway Plan Implementation 2014
BRC-SR-19-178
$150,000.00 $100,000.00 19 Partnerships Projects
$450,000.00 COMM_Key
Clarion, Crawford, Erie, Forest, Lawrence, Mercer, Venango, Warren
Northwest Pennsylvania Regional Planning & Development Commission
Northwest PA Greenway Plan Implementation 2014
BRC-SR-19-178
$150,000.00 $100,000.00 19 Partnerships Projects
$450,000.00 COMM_Key
Clarion, Crawford, Erie, Forest, Lawrence, Mercer, Venango, Warren
Northwest Pennsylvania Regional Planning & Development Commission
Northwest PA Greenway Plan Implementation 2014
BRC-SR-19-178
$150,000.00 $100,000.00 19 Partnerships Projects
$450,000.00 COMM_Key
Clarion, Crawford, Erie, Forest, Lawrence, Mercer, Venango, Warren
Northwest Pennsylvania Regional Planning & Development Commission
Northwest PA Greenway Plan Implementation 2014
BRC-SR-19-178
$150,000.00 $100,000.00 19 Partnerships Projects
$450,000.00 COMM_Key
Clarion, Crawford, Erie, Forest, Lawrence, Mercer, Venango, Warren
Northwest Pennsylvania Regional Planning & Development Commission
Northwest Pennsylvania Greenways Implementation Grant
BRC-‐TAG-‐16-‐67
$100,000 $55,100 16 Education and Training (COMM)
$220,000 RIVER_Key
Keystone Fund Projects by County (1994-‐2013)
Page 198 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Clarion, Crawford, Erie, Forest, Lawrence, Mercer, Venango, Warren
Northwest Pennsylvania Regional Planning & Development Commission
Northwest Pennsylvania Greenways Implementation Grant
BRC-‐TAG-‐16-‐67
$100,000 $174,900 16 Education and Training (COMM)
$220,000 COMM_Key
Clarion, Jefferson
Tri County Rails To Trails Association
Brockway to Piney Trail
BRC-‐RTA-‐10-‐13
$100,000 $100,000 10 Acquisition (RT) $500,000 RT_Key
Clearfield Bigler Township Madera School Park (aka B & B Park)
BRC-‐SC-‐13.3-‐337
$64,000 $40,000 13.3 Small Communities/Small Projects (COMM)
$128,000 COMM_Key
Clearfield Boggs Township Community Park -‐ Phase 1 -‐ Development
BRC-‐SC-‐18-‐26
$40,000 $40,000 18 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Clearfield Bradford Township Community Park Playground
BRC-‐SC-‐9-‐29
$20,000 $20,000 9 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Clearfield Brady Township Community Park KEY-‐SC-‐1-‐17 $20,000 $20,000 1 Small Communities/Small Projects (COMM)
$29,025 COMM_Key
Clearfield Burnside Township Township Park KEY-‐SC-‐3-‐27 $8,404 $8,000 3 Small Communities/Small Projects (COMM)
$19,047 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 199 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Clearfield Clearfield Borough Bucky Strunk Memorial Softball Field Acquisition
BRC-‐ACQ-‐12.5-‐14
$29,300 $29,300 12.5 Acquisition (COMM)
$58,600 COMM_Key
Clearfield Clearfield Borough Bucky Strunk Memorial Softball Field Master Site Plan
BRC-‐TAG-‐13.3-‐463
$6,000 $6,000 13.3 Master Site Plans (COMM)
$12,000 COMM_Key
Clearfield Clearfield Borough Lower Witmer Park Boat Launch
BRC-‐PRD-‐13-‐96
$20,000 $20,000 13 Park Rehabilitation and Development (COMM)
$40,000 COMM_Key
Clearfield Clearfield Borough Parks and Riverfront Master Site Plan
BRC-‐TAG-‐12.5-‐1
$18,500 $18,500 12.5 Master Site Plans (COMM)
$37,000 COMM_Key
Clearfield Clearfield Borough Upper Witmer Park BRC-‐PRD-‐14-‐128
$190,100 $150,000 14 Park Rehabilitation and Development (COMM)
$388,000 COMM_Key
Clearfield Clearfield County Curwensville Lake Authority Master Site Plan
BRC-‐TAG-‐15-‐89
$25,000 $25,000 15 Master Site Plans (COMM)
$50,000 COMM_Key
Clearfield Clearfield County Curwensville Lake Park -‐ Development
BRC-‐PRD-‐17-‐111
$12,807 $13,000 17 Park Rehabilitation and Development (COMM)
$26,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 200 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Clearfield Clearfield County Peer-‐to-‐Peer BRC-‐TAG-‐12-‐1
$10,000 $10,000 12 Peer-‐to-‐Peer Tech. Assistance (COMM)
$11,000 COMM_Key
Clearfield Clearfield County Municipal Services & Recreation Authority
Camp Wopsononock MSDP
KEY-‐TAG-‐4-‐32
$20,000 $20,000 4 Master Site Plans (COMM)
$40,000 COMM_Key
Clearfield Clearfield County Municipal Services & Recreation Authority
Curwensville Dam Campground
KEY-‐PRD-‐2-‐30
$7,000 $7,000 2 Park Rehabilitation and Development (COMM)
$14,000 COMM_Key
Clearfield Clearfield County Municipal Services & Recreation Authority
Curwensville Lake Recreation Area
KEY-‐PRD-‐4-‐31
$100,000 $31,500 4 Park Rehabilitation and Development (COMM)
$227,000 COMM_Key
Clearfield Clearfield County Rails to Trails Association
Grampian Line Rail-‐Trail
KEY-‐RTD-‐3-‐4
$175,000 $100,000 3 Rail Rehabilitation and Development (RT)
$200,000 RT_Key
Clearfield Clearfield County Rails to Trails Association
Grampian Line Trail Section
BRC-‐RTD-‐12-‐7
$12,200 $12,200 12 Rail Rehabilitation and Development (RT)
$24,400 RT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 201 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Clearfield Curwensville Borough
Irvin Park BRC-‐SC-‐7-‐46
$40,000 $40,000 7 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Clearfield Curwensville Borough
Irvin Park Improvements
BRC-‐SC-‐12-‐89
$32,500 $32,500 12 Small Communities/Small Projects (COMM)
$45,000 COMM_Key
Clearfield Decatur Township Fairview Park BRC-‐SC-‐6-‐50
$20,000 $20,000 6 Small Communities/Small Projects (COMM)
$24,396 COMM_Key
Clearfield Decatur Township Fairview Park Phase II-‐Development
BRC-‐SC-‐15-‐78
$40,000 $40,000 15 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Clearfield DuBois City Memorial Park BRC-‐PRD-‐12-‐147
$63,400 $63,400 12 Park Rehabilitation and Development (COMM)
$126,800 COMM_Key
Clearfield DuBois City Memorial Park BRC-‐PRD-‐7-‐52
$52,875 $50,000 7 Park Rehabilitation and Development (COMM)
$105,750 COMM_Key
Clearfield DuBois City Memorial Park KEY-‐PRD-‐2-‐39
$55,000 $55,000 2 Park Rehabilitation and Development (COMM)
$110,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 202 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Clearfield DuBois City Memorial Park KEY-‐PRD-‐5-‐49
$55,300 $55,300 5 Park Rehabilitation and Development (COMM)
$110,600 COMM_Key
Clearfield DuBois City Memorial Park Restrooms
BRC-‐PRD-‐11-‐25
$30,000 $30,000 11 Park Rehabilitation and Development (COMM)
$60,000 COMM_Key
Clearfield DuBois City Memorial Park Swimming Pool
KEY-‐PRD-‐1-‐38
$233,200 $150,000 1 Park Rehabilitation and Development (COMM)
$466,400 COMM_Key
Clearfield DuBois City Sandy Lick Creek Recreation Area
BRC-‐PRD-‐13.3-‐351
$141,900 $141,900 13.3 Park Rehabilitation and Development (COMM)
$283,800 COMM_Key
Clearfield DuBois City Sandy Lick Creek Recreation Area
BRC-‐TAG-‐13-‐182
$20,000 $20,000 13 Master Site Plans (COMM)
$40,000 COMM_Key
Clearfield DuBois City Sandy Lick Creek Recreation Area Trails -‐ Phase II
BRC-‐PRD-‐16-‐220
$171,800 $171,800 16 Park Rehabilitation and Development (COMM)
$343,600 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 203 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Clearfield DuBois City Showers Field -‐ Phase 2-‐Development
BRC-‐PRD-‐18-‐64
$200,000 $200,000 18 Park Rehabilitation and Development (COMM)
$538,000 COMM_Key
Clearfield Ferguson Township Playground BRC-‐SC-‐9-‐76
$22,500 $22,000 9 Small Communities/Small Projects (COMM)
$25,300 COMM_Key
Clearfield Grampian Borough Community Park BRC-‐SC-‐9-‐86
$20,000 $21,000 9 Small Communities/Small Projects (COMM)
$22,700 COMM_Key
Clearfield Grampian Borough Grampian Penn Bloom Community Park
KEY-‐SC-‐5-‐72 $14,126 $14,100 5 Small Communities/Small Projects (COMM)
$14,646 COMM_Key
Clearfield Gulich Township Mountz Memorial Park
KEY-‐SC-‐2-‐56 $19,695 $19,600 2 Small Communities/Small Projects (COMM)
$25,695 COMM_Key
Clearfield Gulich Township Mountz Memorial Park
KEY-‐SC-‐3-‐79 $20,000 $20,000 3 Small Communities/Small Projects (COMM)
$23,500 COMM_Key
Clearfield Gulich Township Mountz Memorial Park Addition
KEY-‐ACQ-‐1-‐55
$5,650 $5,600 1 Acquisition (COMM)
$11,300 COMM_Key
Clearfield Gulich Township Mountz Memorial Park Addition
KEY-‐ACQ-‐3-‐78
$5,500 $5,500 3 Acquisition (COMM)
$11,000 COMM_Key
Clearfield Headwaters Charitable Trust
Brockway to Piney Feasibility Study
BRC-‐RTP-‐8-‐7
$15,800 $15,000 8 Feasibility Studies (RT)
$31,600 RT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 204 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Clearfield Headwaters Charitable Trust
Snow Shoe Rail Trail Development
KEY-‐RTD-‐5-‐7
$65,000 $65,000 5 Rail Rehabilitation and Development (RT)
$455,100 RT_Key
Clearfield Headwaters R. C. & D. Council
Clearfield-‐Grampian Trail
KEY-‐RTD-‐95-‐16
$19,500 $19,500 1 Rail Rehabilitation and Development (RT)
$39,000 RT_Key
Clearfield Houtzdale Line Rails to Trails
Houtzdale Line Rail-‐Trail
KEY-‐RTD-‐3-‐9
$16,000 $16,000 3 Rail Rehabilitation and Development (RT)
$32,000 RT_Key
Clearfield Houtzdale Line Rails to Trails
Houtzdale Line Rails to Trails
BRC-‐RTD-‐7-‐7
$14,225 $14,000 7 Rail Rehabilitation and Development (RT)
$28,451 RT_Key
Clearfield Houtzdale Line Rails to Trails
Trail Surfacing and Drainage
BRC-‐RTD-‐8-‐8
$4,600 $5,000 8 Rail Rehabilitation and Development (RT)
$10,000 RT_Key
Clearfield Irvona Borough Elderberry Park BRC-‐SC-‐11-‐128
$26,700 $26,700 11 Small Communities/Small Projects (COMM)
$33,400 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 205 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Clearfield Irvona Borough Elderberry Park KEY-‐SC-‐5-‐95 $14,000 $14,000 5 Small Communities/Small Projects (COMM)
$15,000 COMM_Key
Clearfield Irvona Borough Elderberry Park Expansion
BRC-‐ACQ-‐17-‐223
$29,825 $25,000 17 Acquisition (COMM)
$59,650 COMM_Key
Clearfield Karthaus Township Karthaus Park -‐ Development
BRC-‐SC-‐17-‐41
$38,494 $38,500 17 Small Communities/Small Projects (COMM)
$56,988 COMM_Key
Clearfield Karthaus Township Karthaus Park Master Site Plan
BRC-‐TAG-‐13-‐188
$8,000 $8,000 13 Master Site Plans (COMM)
$16,000 COMM_Key
Clearfield Lawrence Township Lawrence Township Recreation Park -‐ Phase 4
BRC-‐PRD-‐12-‐167
$21,000 $21,000 12 Park Rehabilitation and Development (COMM)
$42,000 COMM_Key
Clearfield Lawrence Township Recreation Park BRC-‐PRD-‐10-‐122
$18,173 $18,000 10 Park Rehabilitation and Development (COMM)
$36,346 COMM_Key
Clearfield Lawrence Township Recreational Park -‐ Phase II
BRC-‐PRD-‐9-‐111
$19,700 $19,700 9 Park Rehabilitation and Development (COMM)
$39,400 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 206 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Clearfield Lawrence Township Recreational Park -‐Development
BRC-‐PRD-‐17-‐130
$8,100 $8,100 17 Park Rehabilitation and Development (COMM)
$16,200 COMM_Key
Clearfield Lawrence Township Recreational Park-‐Phase I
KEY-‐PRD-‐2-‐77
$114,000 $114,000 2 Park Rehabilitation and Development (COMM)
$229,000 COMM_Key
Clearfield Lawrence Township Township Park KEY-‐ACQ-‐3-‐109
$20,400 $20,400 3 Acquisition (COMM)
$40,800 COMM_Key
Clearfield Mahaffey Borough Scout Community Park
BRC-‐SC-‐12-‐107
$20,000 $20,000 12 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Clearfield Mahaffey Borough Scout Park BRC-‐SC-‐7-‐114
$20,000 $20,000 7 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Clearfield Morris Township Recreation Area Phase II
KEY-‐SC-‐2-‐108
$20,000 $20,000 2 Small Communities/Small Projects (COMM)
$27,150 COMM_Key
Clearfield Osceola Mills Borough
Clear Centre Swimming Pool
KEY-‐PRD-‐4-‐120
$192,400 $71,800 4 Park Rehabilitation and Development (COMM)
$384,800 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 207 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Clearfield Ramey Borough Palcher Park BRC-‐SC-‐6-‐156
$11,000 $20,000 6 Small Communities/Small Projects (COMM)
$12,500 COMM_Key
Clearfield Ramey Borough Palcher Park BRC-‐SC-‐9-‐173
$20,000 $21,000 9 Small Communities/Small Projects (COMM)
$21,700 COMM_Key
Clearfield Sandy Township Recreation Park Improvements
BRC-‐PRD-‐11-‐77
$53,700 $53,700 11 Park Rehabilitation and Development (COMM)
$107,400 COMM_Key
Clearfield Troutville Borough Troutville Park BRC-‐SC-‐9-‐211
$28,000 $28,000 9 Small Communities/Small Projects (COMM)
$36,000 COMM_Key
Clearfield Westover Borough Mosser Park BRC-‐SC-‐13-‐328
$24,800 $24,800 13 Small Communities/Small Projects (COMM)
$31,000 COMM_Key
Clearfield Westover Borough Mosser Park -‐ Phase 2
BRC-‐SC-‐12-‐128
$26,000 $26,000 12 Small Communities/Small Projects (COMM)
$32,000 COMM_Key
Clearfield Westover Borough Mosser Park -‐ Phase I
BRC-‐SC-‐8-‐216
$25,200 $25,000 8 Small Communities/Small Projects (COMM)
$30,400 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 208 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Clearfield Westover Borough Mosser Recreation Park -‐ Development
BRC-‐SC-‐17-‐52
$30,000 $30,000 17 Small Communities/Small Projects (COMM)
$40,000 COMM_Key
Clearfield Westover Borough Westover Park Master Plan
KEY-‐TAG-‐5-‐226
$15,000 $15,000 5 Master Site Plans (COMM)
$30,000 COMM_Key
Clearfield, Jefferson
Western Pennsylvania Conservancy
Redbank Creek Watershed Conservation Plan
BRC-‐RCP-‐10-‐13
$174,900 $170,000 10 Planning (RIV) $356,700 RIVER_Key
Clinton Castanea Township Harvey's Run Park BRC-‐SC-‐8-‐35
$23,000 $23,000 8 Small Communities/Small Projects (COMM)
$25,000 COMM_Key
Clinton Castanea Township Lower Creek Road Park -‐ Phase I
BRC-‐SC-‐10-‐68
$40,000 $40,000 10 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Clinton Chapman Township North Bend Boat Launch
BRC-‐RCD-‐16-‐175
$63,028 $55,400 16 Development (RIV)
$118,484 COMM_Key
Clinton Clinton County Clinton Co. Greenway & Open Space Plan
BRC-‐TAG-‐13.3-‐464
$130,000 $130,000 13.3 Greenway Plans (COMM)
$260,000 COMM_Key
Clinton Clinton County Peer-‐To-‐Peer Project BRC-‐TAG-‐7-‐38
$7,500 $7,500 7 Peer-‐to-‐Peer Tech. Assistance (COMM)
$8,250 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 209 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Clinton Flemington Borough Grove Community Park -‐ Development
BRC-‐PRD-‐17-‐119
$88,669 $88,600 17 Park Rehabilitation and Development (COMM)
$177,337 COMM_Key
Clinton Flemington Borough Grove Community Park Master Site Plan
BRC-‐TAG-‐14-‐206
$13,000 $13,000 14 Master Site Plans (COMM)
$26,000 COMM_Key
Clinton Flemington Borough Grove Park KEY-‐SC-‐4-‐59 $8,367 $8,400 4 Small Communities/Small Projects (COMM)
$9,867 COMM_Key
Clinton Lock Haven Area Flood Protection Authority
River Walk KEY-‐PRD-‐4-‐84
$60,500 $60,500 4 Park Rehabilitation and Development (COMM)
$121,000 COMM_Key
Clinton Lock Haven City Comprehensive Recreation & Park Plan
KEY-‐TAG-‐1-‐73
$12,000 $12,000 1 Comp. Rec., Park, & Open Space Plans (COMM)
$25,000 COMM_Key
Clinton Lock Haven City Piper Harmon Playground
BRC-‐PRD-‐13-‐117
$63,900 $63,900 13 Park Rehabilitation and Development (COMM)
$127,800 COMM_Key
Clinton Northcentral Pennsylvania Conservancy
New Garden Property
KEY-‐LTA-‐4-‐13
$350,000 $325,000 4 Open Space Acquisition (LT)
$850,000 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 210 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Clinton Wayne Township Wayne Township Nature Park
BRC-‐PRD-‐15-‐72
$156,700 $63,000 15 Park Rehabilitation and Development (COMM)
$313,500 COMM_Key
Clinton Western Clinton County Recreation Authority
WCCRA Rec. Center Feasibility Study
BRC-‐TAG-‐14-‐250
$12,787 $12,700 14 Feasibility Studies (COMM)
$25,575 COMM_Key
Clinton Western Pennsylvania Conservancy
Patricia Knarr Tract Acquisition
BRC-LTA-19-30
$450,000.00 $450,000.00 19 Open Space Acquisition (LT)
$900,000.00 LT_Key
Clinton Western Pennsylvania Conservancy
Patricia Knarr Tract Acquisition
BRC-LTA-19-30
$450,000.00 $450,000.00 19 Open Space Acquisition (LT)
$900,000.00 LT_Key
Clinton Western Pennsylvania Conservancy
Patricia Knarr Tract Acquisition
BRC-LTA-19-30
$450,000.00 $450,000.00 19 Open Space Acquisition (LT)
$900,000.00 LT_Key
Clinton Western Pennsylvania Conservancy
Tamarack Swamp KEY-‐LTA-‐4-‐23
$82,500 $82,500 4 Critical Habitat Acquisition (LT)
$165,000 LT_Key
Clinton Woodward Township
Boat Launch BRC-‐PRD-‐13.3-‐451
$114,800 $114,800 13.3 Park Rehabilitation and Development (COMM)
$247,300 COMM_Key
Clinton Woodward Township
River Park KEY-‐PRD-‐3-‐243
$100,000 $100,000 3 Park Rehabilitation and Development (COMM)
$200,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 211 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Clinton Woodward Township
Riverview Park-‐ Development
BRC-‐SC-‐18-‐44
$40,000 $40,000 18 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Columbia Benton Borough Benton Park-‐ Development
BRC-‐PRD-‐16-‐120
$82,000 $82,000 16 Park Rehabilitation and Development (COMM)
$164,000 COMM_Key
Columbia Benton Borough Borough Park Master Plan
BRC-‐TAG-‐12-‐224
$10,000 $10,000 12 Master Site Plans (COMM)
$20,000 COMM_Key
Columbia Berwick Borough Ber-‐Vaughn Park KEY-‐PRD-‐2-‐11
$60,000 $60,000 2 Park Rehabilitation and Development (COMM)
$120,000 COMM_Key
Columbia Berwick Borough Berwick Riverfront Trail Project
BRC-‐PRD-‐16-‐121
$100,000 $100,000 16 Park Rehabilitation and Development (COMM)
$413,550 COMM_Key
Columbia Bloomsburg Town Bloomsburg Park BRC-‐PRD-‐14-‐115
$244,400 $244,000 14 Park Rehabilitation and Development (COMM)
$488,800 COMM_Key
Columbia Bloomsburg Town Bloomsburg Park Master Site Plan
BRC-‐TAG-‐12-‐225
$50,900 $40,900 12 Master Site Plans (COMM)
$101,800 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 212 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Columbia Bloomsburg Town Comp. Recreation, Park & Open Space Plan
KEY-‐TAG-‐5-‐19
$15,400 $15,400 5 Comp. Rec., Park, & Open Space Plans (COMM)
$42,800 COMM_Key
Columbia Bloomsburg Town Norris E. Rock Memorial Swimming Pool
BRC-‐PRD-‐9-‐26
$115,600 $115,000 9 Park Rehabilitation and Development (COMM)
$231,200 COMM_Key
Columbia Bloomsburg Town Streater Park -‐ Development
BRC-‐PRD-‐18-‐50
$50,000 $50,000 18 Park Rehabilitation and Development (COMM)
$100,000 COMM_Key
Columbia Bloomsburg Town Streater/Ridge/Krause Property Acquisition
BRC-‐ACQ-‐12-‐275
$63,800 $63,800 12 Acquisition (COMM)
$127,600 COMM_Key
Columbia Catawissa Borough Recreational Park KEY-‐PRD-‐5-‐32
$19,350 $19,400 5 Park Rehabilitation and Development (COMM)
$38,700 COMM_Key
Columbia Columbia County Columbia Co. Rec., Park & Open Space Plan
BRC-‐TAG-‐8-‐48
$25,000 $25,000 8 Comp. Rec., Park, & Open Space Plans (COMM)
$50,000 COMM_Key
Columbia Columbia County Columbia County Susquehanna Trail
BRC-‐PRD-‐6-‐43
$258,000 $200,000 6 Park Rehabilitation and Development (COMM)
$1,976,600 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 213 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Columbia Columbia County Peer-‐to-‐Peer KEY-‐TAG-‐4-‐1
$7,500 $7,500 4 Peer-‐to-‐Peer Tech. Assistance (COMM)
$8,250 COMM_Key
Columbia Columbia County Twin Bridges Park Rehab
BRC-‐PRD-‐11-‐21
$243,900 $166,600 11 Park Rehabilitation and Development (COMM)
$487,900 COMM_Key
Columbia Columbia County Housing Corporation
Little Property Acquisition
BRC-‐ACQ-‐12-‐72
$31,500 $31,500 12 Acquisition (COMM)
$63,000 COMM_Key
Columbia Millville Borough Community Park BRC-‐PRD-‐10-‐127
$60,000 $60,000 10 Park Rehabilitation and Development (COMM)
$120,000 COMM_Key
Columbia Millville Borough Community Park -‐ Phase I
BRC-‐SC-‐8-‐120
$40,000 $40,000 8 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Columbia, Luzerne
Pennsylvania Environmental Council, Inc.
Greater Wyoming Valley Rivers Conservation Plan
BRC-‐RCP-‐10-‐8
$35,000 $35,000 10 Planning (RIV) $70,000 RIVER_Key
Columbia, Luzerne
SEDA-‐Council of Governments
Berwick Community Connections
BRC-‐TAG-‐13-‐205
$25,000 $25,000 13 Feasibility Studies (COMM)
$60,000 COMM_Key
Columbia, Luzerne, Schuylkill
Pennsylvania Environmental Council, Inc.
Catawissa Watershed Rivers Conservation Plan
BRC-‐RCP-‐12-‐11
$41,000 $41,000 12 Planning (RIV) $82,000 RIVER_Key
Keystone Fund Projects by County (1994-‐2013)
Page 214 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Columbia, Montour
SEDA-‐Council of Governments
Columbia-‐Montour North Branch Canal Trail
BRC-‐RTP-‐10-‐10
$61,465 $62,000 10 Feasibility Studies (RT)
$122,930 RT_Key
Columbia, Montour
SEDA-‐Council of Governments
North Branch Canal Land Survey
BRC-‐TAG-‐14-‐373
$37,500 $26,200 14 Education and Training (COMM)
$75,000 COMM_Key
Columbia, Northumberland
The Conservation Fund
Brush Valley BRC-‐LTA-‐9-‐1
$2,350,000 $2,192,000 9 Critical Habitat Acquisition (LT)
$4,700,000 LT_Key
Crawford Bloomfield Township
Playground BRC-‐SC-‐9-‐25
$22,000 $22,000 9 Small Communities/Small Projects (COMM)
$24,000 COMM_Key
Crawford Cambridge Springs Borough
Community Park Master Plan
KEY-‐TAG-‐5-‐30
$8,125 $8,100 5 Master Site Plans (COMM)
$16,250 COMM_Key
Crawford Clear Lake Authority East Branch Trail -‐ Phase 1
BRC-‐RTD-‐12-‐6
$200,000 $210,000 12 Rail Rehabilitation and Development (RT)
$1,335,000 RT_Key
Crawford Cochranton Borough Little Sugar Creek Pedestrian Bridge (SRS)
BRC-‐PRD-‐11.5-‐18
$14,000 $14,000 11.5 Park Rehabilitation and Development (COMM)
$72,600 COMM_Key
Crawford Conneaut Lake Borough
Fireman's Beach - Development
BRC-PRD-19-73
$400,000.00 $400,000.00 19 Park Rehabilitation and Development (COMM)
$800,000.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 215 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Crawford Conneaut Lake Borough
Fireman's Beach - Development
BRC-PRD-19-73
$400,000.00 $400,000.00 19 Park Rehabilitation and Development (COMM)
$800,000.00 COMM_Key
Crawford Conneaut Lake Borough
Fireman's Beach - Development
BRC-PRD-19-73
$400,000.00 $400,000.00 19 Park Rehabilitation and Development (COMM)
$800,000.00 COMM_Key
Crawford Conneaut Valley Economic & Industrial Development Authority
Canal Park KEY-‐PRD-‐1-‐34
$62,027 $62,000 1 Park Rehabilitation and Development (COMM)
$124,054 COMM_Key
Crawford Conneaut Valley Economic & Industrial Development Authority
Trail Feasibility Study BRC-‐TAG-‐8-‐53
$5,000 $5,000 8 Feasibility Studies (COMM)
$10,152 COMM_Key
Crawford Conneautville Borough
Lord Mason Park KEY-‐SC-‐4-‐37 $18,714 $18,000 4 Small Communities/Small Projects (COMM)
$18,714 COMM_Key
Crawford Conneautville Borough
Lord-‐Mason Memorial Park
KEY-‐PRD-‐2-‐32
$39,450 $39,400 2 Park Rehabilitation and Development (COMM)
$78,900 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 216 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Crawford Crawford County Colonel Crawford Park
KEY-‐PRD-‐2-‐34
$30,000 $30,000 2 Park Rehabilitation and Development (COMM)
$60,000 COMM_Key
Crawford Crawford County Colonel Crawford Park Peer-‐to-‐Peer Study
BRC-‐TAG-‐16-‐242
$9,000 $10,000 16 Peer-‐to-‐Peer Tech. Assistance (COMM)
$10,000 COMM_Key
Crawford Crawford County Woodcock Creek Lake Multi-‐Use Trail Phase II
KEY-‐PRD-‐4-‐39
$26,700 $26,700 4 Park Rehabilitation and Development (COMM)
$53,400 COMM_Key
Crawford Crawford County Woodcock Lake Park - Development
BRC-PRD-19-74
$35,230.00 $35,200.00 19 Park Rehabilitation and Development (COMM)
$70,281.00 COMM_Key
Crawford Crawford County Woodcock Lake Park - Development
BRC-PRD-19-74
$35,230.00 $35,200.00 19 Park Rehabilitation and Development (COMM)
$70,281.00 COMM_Key
Crawford Crawford County Woodcock Lake Park - Development
BRC-PRD-19-74
$35,230.00 $35,200.00 19 Park Rehabilitation and Development (COMM)
$70,281.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 217 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Crawford Envision Linesville, Inc.
Seabee Trail BRC-‐RTD-‐12-‐9
$60,000 $60,000 12 Rail Rehabilitation and Development (RT)
$305,000 RT_Key
Crawford Envision Linesville, Inc.
Spillway-‐to-‐Townline Road Trail Study
BRC-‐RTP-‐14-‐278
$17,500 $17,500 14 Feasibility Studies (RT)
$35,000 RT_Key
Crawford French Creek COG French Creek Greenway
BRC-‐TAG-‐8-‐73
$10,100 $15,300 8 Greenway Plans (COMM)
$20,100 COMM_Key
Crawford French Creek Recreational Trails, Inc.
Ernst Bike Trail BRC-‐RTD-‐14-‐365
$200,000 $132,000 14 Rail Rehabilitation and Development (RT)
$276,000 RT_Key
Crawford Greenwood Township
Greenwood Township Park
BRC-‐SC-‐8-‐80
$24,900 $24,000 8 Small Communities/Small Projects (COMM)
$30,600 COMM_Key
Crawford Hayfield Township Meade Road Park KEY-‐SC-‐3-‐85 $20,000 $20,000 3 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Crawford Hydetown Borough Hasbrouck Park Complex
KEY-‐SC-‐4-‐69 $20,000 $20,000 4 Small Communities/Small Projects (COMM)
$28,642 COMM_Key
Crawford Meadville Area Recreation Authority
Meadville Area Rec. Complex Master Site Plan
BRC-‐TAG-‐14-‐220
$15,000 $15,000 14 Master Site Plans (COMM)
$30,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 218 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Crawford Meadville Area Recreation Authority
Meadville Area Recreation Complex
BRC-‐PRD-‐6-‐110
$150,000 $70,000 6 Park Rehabilitation and Development (COMM)
$314,000 COMM_Key
Crawford Meadville Area Recreation Authority
Meadville Area Recreation Complex -‐ Roof Renovation
BRC-‐PRD-‐12-‐171
$55,000 $55,000 12 Park Rehabilitation and Development (COMM)
$110,000 COMM_Key
Crawford Meadville Area Recreation Authority
Recreation Center BRC-‐PRD-‐13.3-‐393
$75,000 $75,000 13.3 Park Rehabilitation and Development (COMM)
$150,000 COMM_Key
Crawford Meadville Area Recreation Authority
Recreation Complex KEY-‐PRD-‐4-‐99
$59,750 $59,700 4 Park Rehabilitation and Development (COMM)
$119,500 COMM_Key
Crawford Meadville Area Recreation Authority
Tennis Courts BRC-‐PRD-‐9-‐131
$70,000 $70,000 9 Park Rehabilitation and Development (COMM)
$140,000 COMM_Key
Crawford Meadville City French Creek / Mill Run Greenways
KEY-‐PRD-‐5-‐127
$45,000 $45,000 5 Park Rehabilitation and Development (COMM)
$90,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 219 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Crawford Meadville City Huidekoper Park KEY-‐PRD-‐2-‐96
$21,980 $21,900 2 Park Rehabilitation and Development (COMM)
$43,960 COMM_Key
Crawford Meadville City Multi-municipal Comp. Rec. Park, Open Space & Master Site Plan
BRC-TAG-19-138
$33,500.00 $33,500.00 19 Comp. Rec., Park, & Open Space Plans (COMM)
$67,000.00 COMM_Key
Crawford Meadville City Multi-municipal Comp. Rec. Park, Open Space & Master Site Plan
BRC-TAG-19-138
$33,500.00 $33,500.00 19 Comp. Rec., Park, & Open Space Plans (COMM)
$67,000.00 COMM_Key
Crawford Meadville City Multi-municipal Comp. Rec. Park, Open Space & Master Site Plan
BRC-TAG-19-138
$33,500.00 $33,500.00 19 Comp. Rec., Park, & Open Space Plans (COMM)
$67,000.00 COMM_Key
Crawford Meadville City Peer-‐to-‐Peer KEY-‐TAG-‐4-‐181
$7,500 $7,500 4 Peer-‐to-‐Peer Tech. Assistance (COMM)
$8,250 COMM_Key
Crawford North Shenango Township
Community Center Park
KEY-‐SC-‐3-‐156
$20,000 $20,000 3 Small Communities/Small Projects (COMM)
$21,000 COMM_Key
Crawford Richmond Township Baseball Field Renovation
BRC-‐SC-‐12-‐117
$16,600 $20,000 12 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Crawford Saegertown Borough Erie Street Baseball/Softball Field
BRC-‐SC-‐12-‐120
$40,000 $40,000 12 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 220 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Crawford Spartansburg Borough
Clear Lake Park BRC-‐SC-‐7-‐179
$33,250 $28,000 7 Small Communities/Small Projects (COMM)
$51,550 COMM_Key
Crawford Spartansburg Borough
East Branch Trail -‐ Remediation
BRC-‐PRD-‐10-‐97
$20,500 $4,603 10 Park Rehabilitation and Development (COMM)
$40,000 COMM_Key
Crawford Springboro Borough Borough Park BRC-‐SC-‐6-‐173
$20,000 $20,000 6 Small Communities/Small Projects (COMM)
$35,000 COMM_Key
Crawford Summit Township Gibson Park KEY-‐SC-‐5-‐195
$20,000 $20,000 5 Small Communities/Small Projects (COMM)
$30,544 COMM_Key
Crawford Summit Township Gibson Park Master Site Plan
BRC-‐TAG-‐16-‐73
$12,500 $12,500 16 Master Site Plans (COMM)
$25,000 COMM_Key
Crawford Titusville City Burgess Park Rehabilitation
BRC-‐PRD-‐12-‐205
$150,000 $150,000 12 Park Rehabilitation and Development (COMM)
$341,300 COMM_Key
Crawford Titusville City Comprehensive Recreation, Open Space & Greenway Plan
BRC-‐TAG-‐15-‐104
$24,000 $24,000 15 Comp. Rec., Park, & Open Space Plans (COMM)
$48,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 221 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Crawford Titusville City Dick Kraffert Pool BRC-‐PRD-‐13-‐149
$200,000 $200,000 13 Park Rehabilitation and Development (COMM)
$418,000 COMM_Key
Crawford Titusville City Ed Myer Complex & Roberts Grove
KEY-‐PRD-‐3-‐219
$495,200 $400,000 3 Park Rehabilitation and Development (COMM)
$1,000,000 COMM_Key
Crawford Titusville City Mini-‐Recreation Plan KEY-‐TAG-‐1-‐135
$5,000 $5,000 1 Master Site Plans (COMM)
$10,000 COMM_Key
Crawford Union Township Ernst Bike Trail KEY-‐RTD-‐5-‐18
$30,000 $80,000 5 Rail Rehabilitation and Development (RT)
$355,866 RT_Key
Crawford Union Township Ernst Bike Trail Study KEY-‐RTP-‐4-‐21
$7,500 $7,500 4 Master Plans (RT)
$15,000 RT_Key
Crawford Vernon Township Roche Park BRC-‐PRD-‐9-‐217
$66,000 $66,000 9 Park Rehabilitation and Development (COMM)
$132,000 COMM_Key
Crawford Western Pennsylvania Conservancy
Smock Fee Acquisition -‐ Cussewago Creek
BRC-‐LTA-‐18-‐22
$315,792 $313,000 18 Open Space Acquisition (LT)
$631,583 LT_Key
Crawford, Erie, Mercer, Venango
Western Pennsylvania Conservancy
French Creek Watershed Aquatic Biodiversity
BRC-‐RCI-‐11-‐17
$120,700 $120,000 11 Implementation (RIV)
$322,500 RIVER_Key
Keystone Fund Projects by County (1994-‐2013)
Page 222 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Crawford, Erie, Warren
Western Pennsylvania Conservancy
Brokenstraw Creek Watershed Plan
BRC-‐RCP-‐13-‐14
$67,800 $67,800 13 Planning (RIV) $135,600 RIVER_Key
Cumberland Alliance for the Chesapeake Bay, Inc.
Cedar Run Watershed Plan
BRC-‐RCP-‐13-‐4
$79,400 $50,000 13 Planning (RIV) $158,900 RIVER_Key
Cumberland Appalachian Trail Conservancy
White Rocks Acquisition
BRC-‐LTA-‐16-‐19
$1,600,000 $1,600,000 16 Open Space Acquisition (LT)
$3,200,400 LT_Key
Cumberland Big Spring Watershed Association
Big Spring Creek Watershed Conservation Plan
BRC-‐RCP-‐9-‐3
$13,000 $13,000 9 Planning (RIV) $26,000 RIVER_Key
Cumberland Carlisle Borough Royer Linear Park aka Forbes Path
BRC-‐PRD-‐13.3-‐346
$189,000 $189,000 13.3 Park Rehabilitation and Development (COMM)
$378,000 COMM_Key
Cumberland Carlisle Borough West End Trail Connection
BRC-‐PRD-‐17-‐220
$206,596 $200,000 17 Park Rehabilitation and Development (COMM)
$413,192 COMM_Key
Cumberland Central Pennsylvania Conservancy
Fogarty Acquisition -‐ Waggoner's Gap
BRC-‐LTA-‐13.3-‐513
$207,800 $190,000 13.3 Open Space Acquisition (LT)
$415,600 LT_Key
Cumberland Central Pennsylvania Conservancy
Millers Gap BRC-‐LTA-‐6-‐5
$99,000 $80,000 6 Open Space Acquisition (LT)
$198,000 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 223 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Cumberland Central Pennsylvania Conservancy
Seven Gables Tract KEY-‐LTA-‐3-‐5 $475,000 $275,000 3 Open Space Acquisition (LT)
$900,000 LT_Key
Cumberland Cumberland County Comprehensive Recreation, Open Space & Greenway Plan Update
BRC-‐TAG-‐16-‐56
$20,000 $20,000 16 Comp. Rec., Park, & Open Space Plans (COMM)
$41,600 COMM_Key
Cumberland Cumberland County Cumberland County Aquifer Recharge Preservation Plan
BRC-‐RCP-‐13.3-‐508
$99,500 $16,700 13.3 Planning (RIV) $199,000 RIVER_Key
Cumberland Cumberland County Cumberland County Aquifer Recharge Preservation Plan
BRC-‐RCP-‐13.3-‐508
$99,500 $82,800 13.3 Planning (RIV) $199,000 COMM_Key
Cumberland Cumberland County Greenway Plan KEY-‐TAG-‐3-‐45
$22,500 $22,500 3 Greenway Plans (COMM)
$45,000 COMM_Key
Cumberland Cumberland County Natural Areas Inventory
KEY-‐TAG-‐2-‐35
$64,834 $64,800 2 Natural Areas Inventories (COMM)
$129,668 COMM_Key
Cumberland Cumberland County Open Space Preservation Plan
BRC-‐TAG-‐7-‐45
$93,571 $93,000 7 Comp. Rec., Park, & Open Space Plans (COMM)
$187,142 COMM_Key
Cumberland Cumberland County Redevelopment Authority
Walnut Street Feasibility Study -‐ Phase II
BRC-‐TAG-‐14-‐236
$35,000 $35,000 14 Feasibility Studies (COMM)
$70,000 COMM_Key
Cumberland Cumberland Valley Chapter of Trout Unlimited, Inc.
LeTort Property Acquisition
BRC-‐RCA-‐12-‐2
$51,150 $48,700 12 Acquisition (RIV)
$102,300 RIVER_Key
Keystone Fund Projects by County (1994-‐2013)
Page 224 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Cumberland Cumberland Valley Rails-‐to-‐Trails Council, Inc.
Cumberland Valley Rail Trail-‐Shippensburg Connector-‐Development
BRC-‐PRT-‐17-‐78
$1,328,500 $100,000 17 Development and Rehabilitation
$1,463,500 RT_Key
Cumberland Cumberland Valley Rails-‐to-‐Trails Council, Inc.
Cumberland Valley Trail
BRC-‐RTD-‐8-‐5
$140,700 $291,400 8 Rail Rehabilitation and Development (RT)
$694,900 RT_Key
Cumberland Cumberland Valley Rails-‐to-‐Trails Council, Inc.
Cumberland Valley Trail
BRC-‐RTD-‐8-‐5
$140,700 $30,000 8 Rail Rehabilitation and Development (RT)
$694,900 RT_Key
Cumberland Cumberland Valley Rails-‐to-‐Trails Council, Inc.
Master Development Plan
KEY-‐RTP-‐95-‐10
$22,600 $22,600 1 Master Plans (RT)
$45,200 RT_Key
Cumberland Dickinson Township Barnitz Mill KEY-‐ACQ-‐5-‐47
$44,000 $42,500 5 Acquisition (COMM)
$88,000 COMM_Key
Cumberland East Pennsboro Township
Adams-‐Ricci Community Park
BRC-‐TAG-‐7-‐60
$11,265 $11,000 7 Master Site Plans (COMM)
$21,530 COMM_Key
Cumberland East Pennsboro Township
Adams-‐Ricci Park-‐Phase III
KEY-‐PRD-‐2-‐41
$96,000 $96,000 2 Park Rehabilitation and Development (COMM)
$200,000 COMM_Key
Cumberland Hampden Township Creekview North Access
KEY-‐ACQ-‐5-‐79
$22,321 $15,000 5 Acquisition (COMM)
$44,625 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 225 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Cumberland Hampden Township Hampden Park KEY-‐PRD-‐3-‐80
$25,000 $25,000 3 Park Rehabilitation and Development (COMM)
$52,600 COMM_Key
Cumberland Hopewell Township Martin Property Acquisition
BRC-‐ACQ-‐9-‐95
$50,200 $40,000 9 Acquisition (COMM)
$100,500 COMM_Key
Cumberland Lemoyne Borough Community Swimming Pool
BRC-‐PRD-‐14-‐149
$542,200 $300,000 14 Park Rehabilitation and Development (COMM)
$1,084,400 COMM_Key
Cumberland Letort Regional Authority
LeTort Nature Trail: Phase 1 Implementation
BRC-‐PRT-‐15-‐11
$235,343 $43,000 15 Development and Rehabilitation
$470,686 COMM_Key
Cumberland Lower Allen Township
Cedar Spring Run Park -‐ Phase 1 -‐ Development
BRC-‐PRD-‐17-‐133
$201,705 $201,700 17 Park Rehabilitation and Development (COMM)
$403,410 COMM_Key
Cumberland Lower Allen Township
Cedar Spring Run Park -‐ Phase 2 -‐ Development
BRC-‐PRD-‐18-‐83
$127,668 $127,500 18 Park Rehabilitation and Development (COMM)
$255,336 COMM_Key
Cumberland Lower Allen Township
Community Park Development
BRC-‐PRD-‐12-‐168
$260,000 $200,000 12 Park Rehabilitation and Development (COMM)
$520,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 226 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Cumberland Lower Allen Township
Linsenbach Parkland Acquisition
BRC-‐ACQ-‐12-‐73
$176,200 $176,000 12 Acquisition (COMM)
$352,300 COMM_Key
Cumberland Lower Allen Township
MSC Park Master Site Plan
BRC-‐TAG-‐14-‐215
$15,000 $15,000 14 Master Site Plans (COMM)
$30,000 COMM_Key
Cumberland Lower Allen Township
Seven Sites KEY-‐PRD-‐2-‐85
$85,600 $85,600 2 Park Rehabilitation and Development (COMM)
$171,200 COMM_Key
Cumberland Lower Allen Township
Two Sites KEY-‐PRD-‐4-‐87
$94,000 $94,000 4 Park Rehabilitation and Development (COMM)
$188,000 COMM_Key
Cumberland Lower Allen Township
Yellow Breeches Watershed Conservation Plan
BRC-‐RCP-‐8-‐16
$124,400 $120,000 8 Planning (RIV) $248,800 RIVER_Key
Cumberland Lower Frankford Township
Opossum Lake Recreation Area
BRC-‐SC-‐14-‐95
$40,000 $40,000 14 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Cumberland Mechanicsburg Borough
Mechanicsburg Area Community Swimming Pool-‐Development
BRC-‐PRD-‐15-‐59
$124,511 $124,000 15 Park Rehabilitation and Development (COMM)
$249,022 COMM_Key
Cumberland Mechanicsburg Borough
Memorial Park KEY-‐PRD-‐1-‐82
$47,900 $47,900 1 Park Rehabilitation and Development (COMM)
$95,800 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 227 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Cumberland Mechanicsburg Borough
Soldier's & Sailor's Memorial Park
BRC-‐PRD-‐7-‐125
$88,900 $80,000 7 Park Rehabilitation and Development (COMM)
$180,600 COMM_Key
Cumberland Mechanicsburg Borough
Soldiers and Sailors Memorial Park- Development
BRC-PRD-19-95
$151,548.00 $150,000.00 19 Park Rehabilitation and Development (COMM)
$303,096.00 COMM_Key
Cumberland Mechanicsburg Borough
Soldiers and Sailors Memorial Park- Development
BRC-PRD-19-95
$151,548.00 $150,000.00 19 Park Rehabilitation and Development (COMM)
$303,096.00 COMM_Key
Cumberland Mechanicsburg Borough
Soldiers and Sailors Memorial Park- Development
BRC-PRD-19-95
$151,548.00 $150,000.00 19 Park Rehabilitation and Development (COMM)
$303,096.00 COMM_Key
Cumberland Middlesex Township Beagle Club Road Park
KEY-‐PRD-‐1-‐84
$120,000 $100,000 1 Park Rehabilitation and Development (COMM)
$320,000 COMM_Key
Cumberland Middlesex Township Middlesex Township Park Rehabilitation
BRC-‐PRD-‐13-‐122
$59,000 $59,000 13 Park Rehabilitation and Development (COMM)
$118,000 COMM_Key
Cumberland Monroe Township Minnich Land Acquisition
BRC-ACQ-19-12
$50,375.00 $50,300.00 19 Acquisition (COMM)
$100,750.00 COMM_Key
Cumberland Monroe Township Minnich Land Acquisition
BRC-ACQ-19-12
$50,375.00 $50,300.00 19 Acquisition (COMM)
$100,750.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 228 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Cumberland Monroe Township Minnich Land Acquisition
BRC-ACQ-19-12
$50,375.00 $50,300.00 19 Acquisition (COMM)
$100,750.00 COMM_Key
Cumberland New Cumberland Borough
Borough Park BRC-‐PRD-‐6-‐123
$87,000 $87,000 6 Park Rehabilitation and Development (COMM)
$174,000 COMM_Key
Cumberland Newville Borough Community Park KEY-‐SC-‐1-‐96 $20,000 $20,000 1 Small Communities/Small Projects (COMM)
$25,000 COMM_Key
Cumberland Newville Borough Newville Community Park
BRC-‐SC-‐6-‐126
$20,000 $20,000 6 Small Communities/Small Projects (COMM)
$28,843 COMM_Key
Cumberland North Newton Township
Township Park BRC-‐PRD-‐13-‐131
$78,400 $78,000 13 Park Rehabilitation and Development (COMM)
$156,800 COMM_Key
Cumberland Penn Township Township Park Development
BRC-‐SC-‐12-‐114
$40,000 $40,000 12 Small Communities/Small Projects (COMM)
$73,700 COMM_Key
Cumberland Shippensburg Borough
Pool Feasibility Study KEY-‐TAG-‐1-‐127
$3,750 $3,700 1 Feasibility Studies (COMM)
$7,500 COMM_Key
Cumberland Shippensburg Regional Recreation & Park Commission
Comp. Rec, Park & Open Space Plan/Master Site Plan
BRC-‐TAG-‐8-‐173
$25,000 $25,000 8 Comp. Rec., Park, & Open Space Plans (COMM)
$50,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 229 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Cumberland Shippensburg Township
Britton Road Park BRC-‐PRD-‐6-‐167
$150,000 $150,000 6 Park Rehabilitation and Development (COMM)
$300,000 COMM_Key
Cumberland Shiremanstown Borough
Memorial Park BRC-‐SC-‐9-‐186
$35,000 $25,000 9 Small Communities/Small Projects (COMM)
$50,000 COMM_Key
Cumberland Shiremanstown Borough
Memorial Park-‐ Development
BRC-‐SC-‐18-‐41
$28,000 $28,000 18 Small Communities/Small Projects (COMM)
$36,000 COMM_Key
Cumberland Shiremanstown Borough
Two Sites KEY-‐SC-‐4-‐139
$20,000 $20,000 4 Small Communities/Small Projects (COMM)
$39,700 COMM_Key
Cumberland Silver Spring Township
Comp. Rec., Park and Open Space Plan Update
BRC-‐TAG-‐8-‐175
$15,000 $15,000 8 Comp. Rec., Park, & Open Space Plans (COMM)
$30,000 COMM_Key
Cumberland Silver Spring Township
Comprehensive Recreation, Open Space & Greenway Plan
BRC-‐TAG-‐16-‐72
$27,015 $27,000 16 Greenway Plans (COMM)
$54,030 COMM_Key
Cumberland Silver Spring Township Paul Walters Memorial Park- Development
BRC-PRD-19-115
$350,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)
$800,000.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 230 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Cumberland Silver Spring Township Paul Walters Memorial Park- Development
BRC-PRD-19-115
$350,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)
$800,000.00 COMM_Key
Cumberland Silver Spring Township Paul Walters Memorial Park- Development
BRC-PRD-19-115
$350,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)
$800,000.00 COMM_Key
Cumberland Silver Spring Township Potteiger Park- Development
BRC-PRD-19-116
$54,780.00 $50,000.00 19 Park Rehabilitation and Development (COMM)
$110,045.00 COMM_Key
Cumberland Silver Spring Township Potteiger Park- Development
BRC-PRD-19-116
$54,780.00 $50,000.00 19 Park Rehabilitation and Development (COMM)
$110,045.00 COMM_Key
Cumberland Silver Spring Township Potteiger Park- Development
BRC-PRD-19-116
$54,780.00 $50,000.00 19 Park Rehabilitation and Development (COMM)
$110,045.00 COMM_Key
Cumberland Silver Spring Township
Stony Ridge Park-‐Phase I
BRC-‐PRD-‐8-‐176
$175,000 $150,000 8 Park Rehabilitation and Development (COMM)
$370,000 COMM_Key
Cumberland Silver Spring Township
Willow Mill Park Master Plan
KEY-‐TAG-‐4-‐140
$15,000 $15,000 4 Master Site Plans (COMM)
$30,000 COMM_Key
Cumberland South Middleton Township
Leaman Farm Acquisition
BRC-‐ACQ-‐12-‐74
$178,700 $150,000 12 Acquisition (COMM)
$357,400 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 231 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Cumberland South Middleton Township
Spring Meadows KEY-‐ACQ-‐2-‐143
$176,950 $150,000 2 Acquisition (COMM)
$354,500 COMM_Key
Cumberland South Middleton Township
Spring Meadows KEY-‐ACQ-‐3-‐198
$143,500 $140,000 3 Acquisition (COMM)
$287,000 COMM_Key
Cumberland South Middleton Township
Spring Meadows Park Master Site Plan
BRC-‐TAG-‐18-‐149
$16,100 $16,000 18 Master Site Plans (COMM)
$32,200 COMM_Key
Cumberland South Middleton Township
Two Sites KEY-‐PRD-‐5-‐187
$207,000 $150,000 5 Park Rehabilitation and Development (COMM)
$471,000 COMM_Key
Cumberland Southampton Township
Goshorn Property BRC-‐ACQ-‐7-‐177
$132,300 $130,000 7 Acquisition (COMM)
$264,600 COMM_Key
Cumberland Southampton Township
Peer Study BRC-‐TAG-‐6-‐5
$7,500 $7,500 6 Peer-‐to-‐Peer Tech. Assistance (COMM)
$8,250 COMM_Key
Cumberland The Nature Conservancy
Sutton Property Acquisition
BRC-‐LTA-‐13-‐23
$212,100 $212,000 13 Open Space Acquisition (LT)
$424,200 LT_Key
Cumberland Upper Allen Township
Beamer Property Acquisition
BRC-‐ACQ-‐11.5-‐41
$250,000 $100,000 11.5 Acquisition (COMM)
$638,000 COMM_Key
Cumberland Upper Allen Township
Friendship Park BRC-‐PRD-‐6-‐182
$162,200 $162,200 6 Park Rehabilitation and Development (COMM)
$324,400 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 232 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Cumberland Upper Allen Township
Simpson Park -‐ Phase 2 Development
BRC-‐PRD-‐12-‐210
$150,000 $150,000 12 Park Rehabilitation and Development (COMM)
$357,613 COMM_Key
Cumberland Upper Allen Township
Simpson Track Park-‐Phase I
BRC-‐PRD-‐8-‐197
$100,000 $100,000 8 Park Rehabilitation and Development (COMM)
$231,000 COMM_Key
Cumberland Upper Allen Township
Winding Hills Park Phase 1 West -‐ Development
BRC-‐PRD-‐17-‐157
$125,000 $125,000 17 Park Rehabilitation and Development (COMM)
$250,000 COMM_Key
Cumberland West Pennsboro Township
Bethany Church Land Acquisition
BRC-‐ACQ-‐11.5-‐15
$25,200 $25,000 11.5 Acquisition (COMM)
$85,000 COMM_Key
Cumberland West Pennsboro Township
Township Park BRC-‐PRD-‐13-‐155
$151,400 $100,000 13 Park Rehabilitation and Development (COMM)
$302,800 COMM_Key
Cumberland Wormleysburg Borough
North Second Street Park
BRC-‐SC-‐9-‐234
$40,000 $40,000 9 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Cumberland, Franklin
Shippensburg Area Recreation & Park Commission
Circuit Rider Director of Recreation & Parks
BRC-‐TAG-‐7-‐174
$36,000 $78,250 7 Circuit Rider (COMM)
$72,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 233 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Cumberland, Franklin
The Nature Conservancy
Vernal Pool Inventory, Conserv. & Mgmt.
BRC-‐LTP-‐11-‐5
$29,300 $29,000 11 Critical Habitat Planning (LT)
$58,600 LT_Key
Dauphin Central Pennsylvania Conservancy
Powell's & Armstrong Creeks Watershed Plan
BRC-‐RCP-‐10-‐1
$45,015 $45,000 10 Planning (RIV) $106,095 RIVER_Key
Dauphin Central Pennsylvania Conservancy
Schreckengaust Conservation Area Acquisition
BRC-‐LTA-‐8-‐4
$74,500 $74,000 8 Critical Habitat Acquisition (LT)
$149,000 LT_Key
Dauphin Conewago Township Conewago Township Park -‐ Phase 2 -‐ Development
BRC-‐PRD-‐18-‐59
$206,081 $200,000 18 Park Rehabilitation and Development (COMM)
$412,162 COMM_Key
Dauphin Conewago Township Hershey School/Trust Land Acquisition
BRC-‐ACQ-‐14-‐51
$435,200 $300,000 14 Acquisition (COMM)
$870,500 COMM_Key
Dauphin Dauphin County Capital Area Greenbelt – Safety Improvements – Development
BRC-PRD-19-75
$500,000.00 $500,000.00 19 Park Rehabilitation and Development (COMM)
$1,283,000.00 COMM_Key
Dauphin Dauphin County Capital Area Greenbelt – Safety Improvements – Development
BRC-PRD-19-75
$500,000.00 $500,000.00 19 Park Rehabilitation and Development (COMM)
$1,283,000.00 COMM_Key
Dauphin Dauphin County Capital Area Greenbelt – Safety Improvements – Development
BRC-PRD-19-75
$500,000.00 $500,000.00 19 Park Rehabilitation and Development (COMM)
$1,283,000.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 234 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Dauphin Dauphin County Capital Area Greenbelt – Safety Improvements – Development
BRC-PRD-19-75
$500,000.00 $500,000.00 19 Park Rehabilitation and Development (COMM)
$1,283,000.00 COMM_Key
Dauphin Dauphin County Capital Area Greenbelt – Safety Improvements – Development
BRC-PRD-19-75
$500,000.00 $500,000.00 19 Park Rehabilitation and Development (COMM)
$1,283,000.00 COMM_Key
Dauphin Dauphin County Capital Area Greenbelt – Safety Improvements – Development
BRC-PRD-19-75
$500,000.00 $500,000.00 19 Park Rehabilitation and Development (COMM)
$1,283,000.00 COMM_Key
Dauphin Dauphin County Capital Area Greenbelt Planning Study
BRC-‐TAG-‐17-‐222
$60,000 $60,000 17 Trail Study (COMM)
$120,000 COMM_Key
Dauphin Dauphin County Everhart Covered Bridge -‐ Ft. Hunter Park
BRC-‐PRD-‐11-‐23
$125,000 $100,000 11 Park Rehabilitation and Development (COMM)
$250,000 COMM_Key
Dauphin Dauphin County Fort Hunter Park-‐Final Development Phase
BRC-‐PRD-‐8-‐55
$90,000 $80,000 8 Park Rehabilitation and Development (COMM)
$180,000 COMM_Key
Dauphin Dauphin County Lykens Valley Rail/Trail Feasibility Study
BRC-‐RTP-‐7-‐2
$15,000 $15,000 7 Feasibility Studies (RT)
$30,000 RT_Key
Dauphin Dauphin County Parks, Open Space and Greenway Plan
BRC-‐TAG-‐11.5-‐21
$37,500 $35,000 11.5 Greenway Plans (COMM)
$75,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 235 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Dauphin Dauphin County Wildwood Nature Center
KEY-‐PRD-‐2-‐36
$500,000 $250,000 2 Park Rehabilitation and Development (COMM)
$1,761,100 COMM_Key
Dauphin Dauphin County Wildwood Park Trail and Lake Improvements – Development
BRC-PRD-19-205
$32,176.00 $32,000.00 19 Park Rehabilitation and Development (COMM)
$128,704.00 COMM_Key
Dauphin Dauphin County Wildwood Park Trail and Lake Improvements – Development
BRC-PRD-19-205
$32,176.00 $32,000.00 19 Park Rehabilitation and Development (COMM)
$128,704.00 COMM_Key
Dauphin Dauphin County Wildwood Park Trail and Lake Improvements – Development
BRC-PRD-19-205
$32,176.00 $32,000.00 19 Park Rehabilitation and Development (COMM)
$128,704.00 COMM_Key
Dauphin Dauphin County Wildwood Park Trail and Lake Improvements – Development
BRC-PRD-19-205
$32,176.00 $32,000.00 19 Park Rehabilitation and Development (COMM)
$128,704.00 COMM_Key
Dauphin Derry Township Bicycle Path BRC-‐PRD-‐12-‐289
$109,200 $109,200 12 Park Rehabilitation and Development (COMM)
$218,400 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 236 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Dauphin Derry Township Bicycle Path KEY-‐PRD-‐5-‐46
$200,000 $150,000 5 Park Rehabilitation and Development (COMM)
$3,254,000 COMM_Key
Dauphin Halifax Area Recreation Authority
Community Park KEY-‐PRD-‐2-‐57
$88,900 $88,900 2 Park Rehabilitation and Development (COMM)
$177,900 COMM_Key
Dauphin Halifax Borough Riverfront Park BRC-‐RCD-‐8-‐15
$40,000 $25,000 8 Development (RIV)
$60,000 RIVER_Key
Dauphin Halifax Township Fort Halifax Park BRC-‐TAG-‐13-‐184
$34,600 $34,500 13 Master Site Plans (COMM)
$69,100 COMM_Key
Dauphin Harrisburg City Capital Area Greenbelt
BRC-‐PRD-‐8-‐81
$303,000 $300,000 8 Park Rehabilitation and Development (COMM)
$1,141,900 COMM_Key
Dauphin Harrisburg City Commerce Bank Park
BRC-‐PRD-‐14-‐144
$500,000 $500,000 14 Park Rehabilitation and Development (COMM)
$1,390,400 COMM_Key
Dauphin Harrisburg City Riverfront Park KEY-‐PRD-‐5-‐82
$250,000 $150,000 5 Park Rehabilitation and Development (COMM)
$500,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 237 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Dauphin Harrisburg City Shipoke, Wilson Park, and Norwood Playgr
KEY-‐PRD-‐3-‐82
$101,500 $101,500 3 Park Rehabilitation and Development (COMM)
$216,500 COMM_Key
Dauphin Highspire Borough Charles Street Park and Memorial Park
BRC-‐SC-‐9-‐93
$40,000 $40,000 9 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Dauphin Highspire Borough Reservoir Park-‐Development
BRC-‐PRD-‐16-‐174
$312,500 $312,000 16 Park Rehabilitation and Development (COMM)
$625,000 COMM_Key
Dauphin Highspire Borough Three Sites KEY-‐SC-‐5-‐87 $19,974 $20,000 5 Small Communities/Small Projects (COMM)
$19,974 COMM_Key
Dauphin Hummelstown Borough
Hummel Nature Trail BRC-‐SC-‐9-‐98
$40,000 $40,000 9 Small Communities/Small Projects (COMM)
$73,000 COMM_Key
Dauphin Hummelstown Borough
Hummelstown Neighborhood Park
KEY-‐PRD-‐5-‐90
$81,919 $82,000 5 Park Rehabilitation and Development (COMM)
$163,838 COMM_Key
Dauphin Hummelstown Borough
Hummelstown United Water Company Trail
BRC-‐SC-‐6-‐85
$18,000 $18,000 6 Small Communities/Small Projects (COMM)
$18,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 238 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Dauphin Hummelstown Borough
Mehaffie Park KEY-‐SC-‐4-‐68 $19,000 $19,000 4 Small Communities/Small Projects (COMM)
$19,000 COMM_Key
Dauphin Londonderry Township
Braeburn Park BRC-‐SC-‐7-‐104
$27,240 $27,000 7 Small Communities/Small Projects (COMM)
$55,517 COMM_Key
Dauphin Londonderry Township
Sunset Park KEY-‐PRD-‐4-‐85
$30,000 $30,000 4 Park Rehabilitation and Development (COMM)
$78,125 COMM_Key
Dauphin Lower Paxton Township
Friendship Center Phase 3 and Brightbill Park - Development
BRC-PRD-19-94
$250,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)
$506,100.00 COMM_Key
Dauphin Lower Paxton Township
Friendship Center Phase 3 and Brightbill Park - Development
BRC-PRD-19-94
$250,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)
$506,100.00 COMM_Key
Dauphin Lower Paxton Township
Friendship Center Phase 3 and Brightbill Park - Development
BRC-PRD-19-94
$250,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)
$506,100.00 COMM_Key
Dauphin Lower Paxton Township
Friendship Center-‐ Phase 2-‐ Development
BRC-‐PRD-‐16-‐145
$115,031 $115,000 16 Park Rehabilitation and Development (COMM)
$230,062 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 239 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Dauphin Lower Paxton Township
Greenway Study BRC-‐TAG-‐11-‐221
$25,000 $25,000 11 Greenway Plans (COMM)
$50,000 COMM_Key
Dauphin Lower Paxton Township
Thomas B. George Park
BRC-‐PRD-‐10-‐123
$106,100 $105,000 10 Park Rehabilitation and Development (COMM)
$212,210 COMM_Key
Dauphin Lower Paxton Township
Wolfersberger and Koons Park Master Site Plans
BRC-‐TAG-‐16-‐63
$40,000 $40,000 16 Master Site Plans (COMM)
$80,000 COMM_Key
Dauphin Lower Swatara Township
Memorial Park KEY-‐PRD-‐4-‐89
$30,000 $30,000 4 Park Rehabilitation and Development (COMM)
$60,000 COMM_Key
Dauphin Lower Swatara Township
Messick Tract Acquisition
BRC-‐ACQ-‐11-‐179
$109,000 $109,000 11 Acquisition (COMM)
$218,000 COMM_Key
Dauphin Lykens Borough West Borough Park BRC-‐SC-‐6-‐101
$19,738 $19,700 6 Small Communities/Small Projects (COMM)
$19,738 COMM_Key
Dauphin Middletown Borough
Middletown Swimming Pool Rehab.
KEY-‐PRD-‐3-‐136
$80,000 $80,000 3 Park Rehabilitation and Development (COMM)
$160,000 COMM_Key
Dauphin Middletown Borough
Pool Feasibility Study KEY-‐TAG-‐3-‐135
$10,000 $10,000 3 Feasibility Studies (COMM)
$20,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 240 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Dauphin Millersburg Borough Comp. Open Space Plan/Master Plans
BRC-‐TAG-‐10-‐159
$25,000 $25,000 10 Comp. Rec., Park, & Open Space Plans (COMM)
$50,000 COMM_Key
Dauphin Millersburg Borough Lykens Valley Rail Trail-‐Ned Smith Section -‐ Development
BRC-‐PRD-‐18-‐177
$394,000 $107,800 18 Park Rehabilitation and Development (COMM)
$492,500 COMM_Key
Dauphin Millersburg Borough Riverfront Park-‐Development
BRC-‐PRD-‐15-‐61
$386,350 $280,000 15 Park Rehabilitation and Development (COMM)
$772,700 COMM_Key
Dauphin Millersburg Borough Susquehanna Riverbank Stabilization (Millersburg)
KEY-‐RCD-‐5-‐11
$12,000 $12,000 5 Development (RIV)
$24,000 RIVER_Key
Dauphin Paxton Creek Watershed and Education Association
Paxton Creek Watershed Conservation Plan
BRC-‐RCP-‐8-‐27
$19,000 $19,000 8 Planning (RIV) $38,000 COMM_Key
Dauphin Royalton Borough Kiwanis Park KEY-‐SC-‐1-‐117
$20,000 $20,000 1 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Dauphin South Hanover Township
Peer to Peer BRC-‐TAG-‐10-‐15
$7,500 $7,500 10 Peer-‐to-‐Peer Tech. Assistance (COMM)
$8,250 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 241 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Dauphin South Hanover Township
The Meadows Park-‐Phase I (aka) Hanshue Park
BRC-‐PRD-‐8-‐179
$201,700 $175,000 8 Park Rehabilitation and Development (COMM)
$402,500 COMM_Key
Dauphin Steelton Borough Susquehanna River Boat Launch -‐ Phase I
BRC-‐PRD-‐10-‐138
$150,000 $100,000 10 Park Rehabilitation and Development (COMM)
$300,000 COMM_Key
Dauphin Steelton Borough Susquehanna River Boat Launch -‐ Phase II
BRC-‐PRD-‐11-‐87
$150,000 $150,000 11 Park Rehabilitation and Development (COMM)
$300,000 COMM_Key
Dauphin Steelton Borough Three Borough Parks Improvements
BRC-‐PRD-‐7-‐183
$172,000 $150,000 7 Park Rehabilitation and Development (COMM)
$363,100 COMM_Key
Dauphin Susquehanna Township
Capital Area Greenbelt
KEY-‐ACQ-‐5-‐198
$80,500 $80,500 5 Acquisition (COMM)
$161,000 COMM_Key
Dauphin Susquehanna Township
Capital Area Greenbelt
KEY-‐PRD-‐5-‐197
$462,403 $142,000 5 Park Rehabilitation and Development (COMM)
$924,806 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 242 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Dauphin Susquehanna Township
Crown Point Park BRC-‐PRD-‐11-‐88
$152,900 $100,000 11 Park Rehabilitation and Development (COMM)
$305,800 COMM_Key
Dauphin Susquehanna Township
Three Sites KEY-‐PRD-‐3-‐214
$190,200 $186,000 3 Park Rehabilitation and Development (COMM)
$380,400 COMM_Key
Dauphin Swatara Township Comp. Recreation, Park & Open Space Plan
BRC-‐TAG-‐10-‐172
$20,000 $20,000 10 Comp. Rec., Park, & Open Space Plans (COMM)
$40,000 COMM_Key
Dauphin Swatara Township Pedestrian Greenway Access Study
BRC-‐TAG-‐13.3-‐497
$32,400 $30,000 13.3 Greenway Plans (COMM)
$64,800 COMM_Key
Dauphin Swatara Township Schiavoni Tract Acquisition
BRC-‐ACQ-‐15-‐49
$50,000 $50,000 15 Acquisition (COMM)
$100,000 COMM_Key
Dauphin Swatara Township Swatara Crest Park KEY-‐ACQ-‐3-‐215
$18,000 $18,000 3 Acquisition (COMM)
$36,000 COMM_Key
Dauphin Swatara Township Swatara Crest Park KEY-‐PRD-‐5-‐199
$44,358 $44,400 5 Park Rehabilitation and Development (COMM)
$88,715 COMM_Key
Dauphin The Conservation Fund
Swatara Creek Greenway
KEY-‐LTA-‐5-‐2 $21,400 $20,000 5 Open Space Acquisition (LT)
$42,800 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 243 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Dauphin Tri-‐County Regional Planning Commission
Susquehanna River Conservation Play
KEY-‐RCP-‐95-‐20
$10,000 $10,000 1 Planning (RIV) $20,000 RIVER_Key
Dauphin Washington Township
Loyalton Park BRC-‐SC-‐9-‐222
$40,000 $40,000 9 Small Communities/Small Projects (COMM)
$63,700 COMM_Key
Dauphin West Hanover Township
Comp. Recreation, Park & Open Space Plan
KEY-‐TAG-‐4-‐170
$15,853 $15,800 4 Comp. Rec., Park, & Open Space Plans (COMM)
$31,705 COMM_Key
Dauphin West Hanover Township
Lenker Park BRC-‐PRD-‐9-‐228
$58,800 $58,000 9 Park Rehabilitation and Development (COMM)
$117,600 COMM_Key
Dauphin West Hanover Township
Skyline Commons Park Development
BRC-‐PRD-‐12-‐216
$166,000 $166,000 12 Park Rehabilitation and Development (COMM)
$332,000 COMM_Key
Dauphin Wiconisco Township L & W Memorial Field
KEY-‐PRD-‐4-‐175
$30,000 $30,000 4 Park Rehabilitation and Development (COMM)
$60,000 COMM_Key
Dauphin Wiconisco Township Lykens Valley Rail Trail-‐ Phase I
BRC-‐PRD-‐14-‐186
$116,557 $120,800 14 Park Rehabilitation and Development (COMM)
$233,115 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 244 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Dauphin Williamstown Borough
Williamstown Community Park Master Site Plan
BRC-‐TAG-‐12-‐266
$7,500 $10,000 12 Master Site Plans (COMM)
$20,000 COMM_Key
Dauphin Williamstown Borough Williamstown Park- Development
BRC-SC-19-55
$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)
$60,000.00 COMM_Key
Dauphin Williamstown Borough Williamstown Park- Development
BRC-SC-19-55
$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)
$60,000.00 COMM_Key
Dauphin Williamstown Borough Williamstown Park- Development
BRC-SC-19-55
$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)
$60,000.00 COMM_Key
Dauphin, Lebanon
Swatara Creek Watershed Association, Inc.
Swatara Water Trail Signs
BRC-‐RCD-‐7-‐19
$4,885 $4,800 7 Development (RIV)
$13,770 RIVER_Key
Delaware Aldan Borough Borough Park KEY-‐SC-‐3-‐6 $20,000 $2,000 3 Small Communities/Small Projects (COMM)
$29,000 COMM_Key
Delaware Aston Township Comp. Rec., Pks. & Open Space Plan
BRC-‐TAG-‐8-‐18
$36,500 $36,000 8 Comp. Rec., Park, & Open Space Plans (COMM)
$73,100 COMM_Key
Delaware Aston Township Eagle Field KEY-‐PRD-‐1-‐6
$42,500 $42,500 1 Park Rehabilitation and Development (COMM)
$85,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 245 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Delaware Brookhaven Borough
Bike/Walk Path & Passive Recreation Park
BRC-‐PRD-‐6-‐24
$35,000 $35,000 6 Park Rehabilitation and Development (COMM)
$70,000 COMM_Key
Delaware Chester City Barry Bridge Park Expansion
BRC-‐PRD-‐8-‐38
$275,000 $200,000 8 Park Rehabilitation and Development (COMM)
$1,581,300 COMM_Key
Delaware Chester City Chester Park Improvements
BRC-‐PRD-‐11-‐18
$163,000 $163,000 11 Park Rehabilitation and Development (COMM)
$326,000 COMM_Key
Delaware Chester Heights Borough
Community Park-‐Phase I
KEY-‐PRD-‐2-‐27
$31,150 $25,000 2 Park Rehabilitation and Development (COMM)
$62,300 COMM_Key
Delaware Chester Redevelopment Authority
Riverwalk Plaza BRC-‐PRD-‐14-‐126
$1,000,000 $1,000,000 14 Park Rehabilitation and Development (COMM)
$6,391,600 COMM_Key
Delaware Chester-‐Ridley-‐Crum Watersheds Association
Feasibility Study KEY-‐RTP-‐3-‐3 $22,500 $22,500 3 Feasibility Studies (RT)
$45,000 RT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 246 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Delaware Collingdale Borough Collingdale Community Center
KEY-‐PRD-‐3-‐38
$35,000 $35,000 3 Park Rehabilitation and Development (COMM)
$70,000 COMM_Key
Delaware Colwyn Borough John S. Bosacco Park KEY-‐SC-‐1-‐32 $19,700 $19,700 1 Small Communities/Small Projects (COMM)
$19,700 COMM_Key
Delaware Colwyn Borough Water Street Park KEY-‐SC-‐3-‐39 $19,700 $19,700 3 Small Communities/Small Projects (COMM)
$19,700 COMM_Key
Delaware Colwyn Borough Water Street Park-‐Rehabilitation
BRC-‐SC-‐15-‐75
$20,000 $20,000 15 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Delaware Concord Township Comprehensive Recreation, Open Space and Greenways Plan
BRC-TAG-19-130
$30,000.00 $30,000.00 19 Comp. Rec., Park, & Open Space Plans (COMM)
$60,000.00 COMM_Key
Delaware Concord Township Comprehensive Recreation, Open Space and Greenways Plan
BRC-TAG-19-130
$30,000.00 $30,000.00 19 Comp. Rec., Park, & Open Space Plans (COMM)
$60,000.00 COMM_Key
Delaware Concord Township Comprehensive Recreation, Open Space and Greenways Plan
BRC-TAG-19-130
$30,000.00 $30,000.00 19 Comp. Rec., Park, & Open Space Plans (COMM)
$60,000.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 247 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Delaware Darby Township Brookwood Park BRC-‐PRD-‐5-‐43
$20,000 $20,000 5 Park Rehabilitation and Development (COMM)
$40,000 COMM_Key
Delaware Delaware County Chester Creek Branch Rail-‐Trail -‐ Phase 1 Development
BRC-‐RTD-‐12-‐8
$372,300 $300,000 12 Rail Rehabilitation and Development (RT)
$3,235,800 RT_Key
Delaware Delaware County Delaware County Recreation, Open Space & Greenway Plan -‐ Phase 2
BRC-‐TAG-‐16-‐58
$100,000 $100,000 16 Comp. Rec., Park, & Open Space Plans (COMM)
$200,000 COMM_Key
Delaware Delaware County Delaware River Watershed Conservation Plan
BRC-‐RCP-‐14-‐285
$45,000 $45,000 14 Planning (RIV) $90,000 COMM_Key
Delaware Delaware County East Coast Greenway Study
BRC-‐TAG-‐12-‐234
$50,000 $50,000 12 Greenway Plans (COMM)
$127,000 COMM_Key
Delaware Delaware County Greenway Plan for Darby Creek Watershed
BRC-‐TAG-‐11-‐202
$77,500 $75,000 11 Greenway Plans (COMM)
$155,000 COMM_Key
Delaware Delaware County Mineral Hill Area Park Master Site Plan
BRC-‐TAG-‐17-‐6
$25,000 $25,000 17 Master Site Plans (COMM)
$50,000 COMM_Key
Delaware Eddystone Borough Rehab. Of Dorothy Taylor Gotthardt Playground
BRC-‐SC-‐8-‐61
$39,700 $39,000 8 Small Communities/Small Projects (COMM)
$59,300 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 248 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Delaware Edgemont Township Open Space and Recreation Plan
KEY-‐TAG-‐4-‐51
$15,000 $15,000 4 Comp. Rec., Park, & Open Space Plans (COMM)
$30,000 COMM_Key
Delaware Edgemont Township Township Park-Development
BRC-PRD-19-206
$272,422.15 $220,000.00 19 Park Rehabilitation and Development (COMM)
$544,844.30 COMM_Key
Delaware Edgemont Township Township Park-Development
BRC-PRD-19-206
$272,422.15 $220,000.00 19 Park Rehabilitation and Development (COMM)
$544,844.30 COMM_Key
Delaware Edgemont Township Township Park-Development
BRC-PRD-19-206
$272,422.15 $220,000.00 19 Park Rehabilitation and Development (COMM)
$544,844.30 COMM_Key
Delaware Folcroft Borough Borough Parks and Community Center
KEY-‐PRD-‐3-‐65
$122,700 $100,000 3 Park Rehabilitation and Development (COMM)
$245,400 COMM_Key
Delaware Glenolden Borough Glenolden Community Park
KEY-‐PRD-‐3-‐74
$40,000 $40,000 3 Park Rehabilitation and Development (COMM)
$80,000 COMM_Key
Delaware Haverford Township Conservation and Development Plan
BRC-‐TAG-‐6-‐82
$50,000 $50,000 6 Master Site Plans (COMM)
$100,000 COMM_Key
Delaware Haverford Township Finelli Tract BRC-‐ACQ-‐9-‐90
$625,000 $100,000 9 Acquisition (COMM)
$1,250,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 249 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Delaware Haverford Township Glendale Road Tract KEY-‐ACQ-‐3-‐83
$88,800 $88,000 3 Acquisition (COMM)
$190,000 COMM_Key
Delaware Lansdowne Borough Ardmore Avenue and Hoffman Park Fields
KEY-‐PRD-‐4-‐80
$100,000 $100,000 4 Park Rehabilitation and Development (COMM)
$200,000 COMM_Key
Delaware Lansdowne Borough Gateway Park and Trail
BRC-‐PRD-‐13-‐113
$100,000 $100,000 13 Park Rehabilitation and Development (COMM)
$468,000 COMM_Key
Delaware Lansdowne Borough Historic Tree Park KEY-‐ACQ-‐2-‐76
$66,000 $34,000 2 Acquisition (COMM)
$132,000 COMM_Key
Delaware Lansdowne Borough Hoffman Park- Development
BRC-PRD-19-89
$185,000.00 $185,000.00 19 Park Rehabilitation and Development (COMM)
$445,000.00 COMM_Key
Delaware Lansdowne Borough Hoffman Park- Development
BRC-PRD-19-89
$185,000.00 $185,000.00 19 Park Rehabilitation and Development (COMM)
$445,000.00 COMM_Key
Delaware Lansdowne Borough Hoffman Park- Development
BRC-PRD-19-89
$185,000.00 $185,000.00 19 Park Rehabilitation and Development (COMM)
$445,000.00 COMM_Key
Delaware Lansdowne Borough Marlyn Park Master Site Plan
BRC-‐TAG-‐12-‐243
$125,000 $10,000 12 Master Site Plans (COMM)
$250,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 250 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Delaware Lansdowne Borough Multi-‐Municipal Rec & Park Plan
BRC-‐TAG-‐10-‐157
$45,000 $45,000 10 Comp. Rec., Park, & Open Space Plans (COMM)
$90,000 COMM_Key
Delaware Marcus Hook Borough
Market Square Memorial Park
BRC-‐PRD-‐7-‐117
$181,551 $100,000 7 Park Rehabilitation and Development (COMM)
$363,103 COMM_Key
Delaware Marcus Hook Borough
Market Square Memorial Park Marina
BRC-‐TAG-‐13-‐194
$15,000 $15,000 13 Feasibility Studies (COMM)
$30,000 COMM_Key
Delaware Marcus Hook Borough
Memorial Field KEY-‐PRD-‐3-‐125
$40,000 $30,000 3 Park Rehabilitation and Development (COMM)
$80,000 COMM_Key
Delaware Marcus Hook Borough
Memorial Field KEY-‐SC-‐4-‐93 $19,500 $19,500 4 Small Communities/Small Projects (COMM)
$19,500 COMM_Key
Delaware Marcus Hook Borough
Memorial Field KEY-‐SC-‐5-‐123
$20,000 $20,000 5 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Delaware Marple Township Mackey-‐Green Bank Acquisition
BRC-‐ACQ-‐7-‐119
$334,000 $330,000 7 Acquisition (COMM)
$668,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 251 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Delaware Marple Township Park Improvements -‐ Three Sites
KEY-‐PRD-‐4-‐96
$50,025 $50,000 4 Park Rehabilitation and Development (COMM)
$100,050 COMM_Key
Delaware Marple Township Veterans Memorial Park
KEY-‐PRD-‐3-‐126
$26,100 $26,000 3 Park Rehabilitation and Development (COMM)
$52,300 COMM_Key
Delaware Marple Township Veterans Memorial Park-‐Phase II
KEY-‐PRD-‐2-‐94
$92,000 $75,000 2 Park Rehabilitation and Development (COMM)
$184,000 COMM_Key
Delaware Media Borough Houtman Park -‐ Development
BRC-‐PRD-‐17-‐137
$201,250 $200,000 17 Park Rehabilitation and Development (COMM)
$405,550 COMM_Key
Delaware Media Borough Scott-‐Lowrie Playground
KEY-‐PRD-‐1-‐83
$20,778 $20,700 1 Park Rehabilitation and Development (COMM)
$41,557 COMM_Key
Delaware Middletown Township
Smedley Tract Master Site Plan
BRC-‐TAG-‐14-‐221
$25,000 $25,000 14 Master Site Plans (COMM)
$50,000 COMM_Key
Delaware Millbourne Borough Community Connector Greenway Plan
BRC-‐TAG-‐18-‐158
$13,250 $13,200 18 Trail Study (COMM)
$28,180 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 252 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Delaware Morton Borough Borough Park KEY-‐SC-‐4-‐107
$19,636 $19,600 4 Small Communities/Small Projects (COMM)
$20,336 COMM_Key
Delaware Natural Lands Trust, Inc.
Darby Creek Greenway Addition
BRC-LTA-19-24
########## ########## 19 Open Space Acquisition (LT)
$2,396,100.00 LT_Key
Delaware Natural Lands Trust, Inc.
Darby Creek Greenway Addition
BRC-LTA-19-24
########## ########## 19 Open Space Acquisition (LT)
$2,396,100.00 LT_Key
Delaware Natural Lands Trust, Inc.
Darby Creek Greenway Addition
BRC-LTA-19-24
########## ########## 19 Open Space Acquisition (LT)
$2,396,100.00 LT_Key
Delaware Natural Lands Trust, Inc.
Darby Creek Greenway Addition
BRC-LTA-19-24
########## ########## 19 Open Space Acquisition (LT)
$2,396,100.00 LT_Key
Delaware Natural Lands Trust, Inc.
Darby Creek Greenway Addition
BRC-LTA-19-24
########## ########## 19 Open Space Acquisition (LT)
$2,396,100.00 LT_Key
Delaware Natural Lands Trust, Inc.
Elwyn Acquisition BRC-‐LTA-‐13-‐24
$1,200,000 $500,000 13 Open Space Acquisition (LT)
$5,300,000 LT_Key
Delaware Natural Lands Trust, Inc.
Hildacy Preserve Addition
BRC-‐LTA-‐6-‐16
$533,000 $250,000 6 Critical Habitat Acquisition (LT)
$1,148,000 LT_Key
Delaware Nether Providence Township
Duer and Houston Tracts
KEY-‐ACQ-‐3-‐149
$250,000 $275,000 3 Acquisition (COMM)
$1,000,000 COMM_Key
Delaware Nether Providence Township
Hepford Park KEY-‐PRD-‐1-‐91
$23,783 $23,700 1 Park Rehabilitation and Development (COMM)
$47,656 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 253 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Delaware Nether Providence Township
Multi-municipal Comprehensive Recreation, Park, Open Space and Greenways Plan
BRC-TAG-19-139
$25,000.00 $25,000.00 19 Comp. Rec., Park, & Open Space Plans (COMM)
$50,000.00 COMM_Key
Delaware Nether Providence Township
Multi-municipal Comprehensive Recreation, Park, Open Space and Greenways Plan
BRC-TAG-19-139
$25,000.00 $25,000.00 19 Comp. Rec., Park, & Open Space Plans (COMM)
$50,000.00 COMM_Key
Delaware Nether Providence Township
Multi-municipal Comprehensive Recreation, Park, Open Space and Greenways Plan
BRC-TAG-19-139
$25,000.00 $25,000.00 19 Comp. Rec., Park, & Open Space Plans (COMM)
$50,000.00 COMM_Key
Delaware Nether Providence Township
Multi-municipal Comprehensive Recreation, Park, Open Space and Greenways Plan
BRC-TAG-19-139
$25,000.00 $25,000.00 19 Comp. Rec., Park, & Open Space Plans (COMM)
$50,000.00 COMM_Key
Delaware Nether Providence Township
Multi-municipal Comprehensive Recreation, Park, Open Space and Greenways Plan
BRC-TAG-19-139
$25,000.00 $25,000.00 19 Comp. Rec., Park, & Open Space Plans (COMM)
$50,000.00 COMM_Key
Delaware Nether Providence Township
Multi-municipal Comprehensive Recreation, Park, Open Space and Greenways Plan
BRC-TAG-19-139
$25,000.00 $25,000.00 19 Comp. Rec., Park, & Open Space Plans (COMM)
$50,000.00 COMM_Key
Delaware Nether Providence Township
Multi-municipal Comprehensive Recreation, Park, Open Space and Greenways Plan
BRC-TAG-19-139
$25,000.00 $25,000.00 19 Comp. Rec., Park, & Open Space Plans (COMM)
$50,000.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 254 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Delaware Nether Providence Township
Multi-municipal Comprehensive Recreation, Park, Open Space and Greenways Plan
BRC-TAG-19-139
$25,000.00 $25,000.00 19 Comp. Rec., Park, & Open Space Plans (COMM)
$50,000.00 COMM_Key
Delaware Nether Providence Township
Multi-municipal Comprehensive Recreation, Park, Open Space and Greenways Plan
BRC-TAG-19-139
$25,000.00 $25,000.00 19 Comp. Rec., Park, & Open Space Plans (COMM)
$50,000.00 COMM_Key
Delaware Newtown Township Trail System -‐ Phase I KEY-‐PRD-‐1-‐95
$105,172 $100,000 1 Park Rehabilitation and Development (COMM)
$210,345 COMM_Key
Delaware Parkside Borough Woodlot Park-‐Phase II-‐Development
BRC-‐SC-‐15-‐82
$40,000 $35,000 15 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Delaware Pennsylvania Environmental Council, Inc.
Ridley Creek Watershed Conservation Plan
KEY-‐RCP-‐95-‐07
$48,000 $48,000 1 Planning (RIV) $106,000 RIVER_Key
Delaware Radnor Township Darby Creek Headwaters Preserve
BRC-ACQ-19-15
########## ########## 19 Acquisition (COMM)
$10,802,200.00 COMM_Key
Delaware Radnor Township Darby Creek Headwaters Preserve
BRC-ACQ-19-15
########## ########## 19 Acquisition (COMM)
$10,802,200.00 COMM_Key
Delaware Radnor Township Darby Creek Headwaters Preserve
BRC-ACQ-19-15
########## ########## 19 Acquisition (COMM)
$10,802,200.00 COMM_Key
Delaware Radnor Township Fenimore Woods Park
KEY-‐PRD-‐1-‐112
$45,000 $45,000 1 Park Rehabilitation and Development (COMM)
$90,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 255 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Delaware Radnor Township Greenways and Open Space Network Plan
BRC-‐TAG-‐17-‐19
$39,875 $35,000 17 Greenway Plans (COMM)
$79,750 COMM_Key
Delaware Ridley Park Borough Eastlake Park Expansion
KEY-‐ACQ-‐3-‐185
$25,000 $15,000 3 Acquisition (COMM)
$50,000 COMM_Key
Delaware Ridley Township Community Center Feasibility Study
BRC-‐TAG-‐14-‐238
$40,000 $40,000 14 Feasibility Studies (COMM)
$80,000 COMM_Key
Delaware Ridley Township Marina Dock Renovation / Extension
BRC-‐PRD-‐11-‐75
$239,700 $200,000 11 Park Rehabilitation and Development (COMM)
$479,300 COMM_Key
Delaware Ridley Township Morrow's Marina BRC-‐ACQ-‐7-‐164
$500,000 $400,000 7 Acquisition (COMM)
$1,210,000 COMM_Key
Delaware Ridley Township Pritchard Site-‐Phase I
KEY-‐PRD-‐2-‐131
$91,450 $90,000 2 Park Rehabilitation and Development (COMM)
$182,900 COMM_Key
Delaware Rose Valley Borough Rhodes Tract BRC-‐RCA-‐8-‐3
$63,500 $98,000 8 Acquisition (RIV)
$127,000 RIVER_Key
Delaware Rutledge Borough Triangle Park KEY-‐SC-‐3-‐188
$16,800 $16,800 3 Small Communities/Small Projects (COMM)
$20,200 COMM_Key
Delaware Sharon Hill Borough Rehabilitation of Three Parks
KEY-‐PRD-‐4-‐138
$25,000 $25,000 4 Park Rehabilitation and Development (COMM)
$50,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 256 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Delaware Springfield Township Netherwood Park KEY-‐PRD-‐3-‐205
$25,700 $25,000 3 Park Rehabilitation and Development (COMM)
$51,400 COMM_Key
Delaware Tinicum Township Former Westinghouse Master Site Plan
BRC-‐TAG-‐14-‐247
$50,000 $50,000 14 Master Site Plans (COMM)
$100,000 COMM_Key
Delaware Tinicum Township Manor Municipal Park
KEY-‐SC-‐5-‐202
$20,000 $20,000 5 Small Communities/Small Projects (COMM)
$28,400 COMM_Key
Delaware Tinicum Township Westinghouse Site Acquisition
BRC-‐ACQ-‐9-‐209
$700,000 $700,000 9 Acquisition (COMM)
$1,400,000 COMM_Key
Delaware Trainer Borough Henry Johnson Park BRC-‐SC-‐6-‐178
$15,000 $15,000 6 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Delaware Upper Chichester Township
Dresner Tract BRC-‐ACQ-‐6-‐183
$320,000 $160,000 6 Acquisition (COMM)
$1,000,000 COMM_Key
Delaware Upper Chichester Township
Upper Chichester Municipal Recreation Complex-‐Development
BRC-‐PRD-‐16-‐162
$214,460 $214,400 16 Park Rehabilitation and Development (COMM)
$428,920 COMM_Key
Delaware Upper Darby Township
Darby Creek Stream Valley Park Trail Feasibility Study
BRC-‐TAG-‐18-‐162
$10,000 $10,000 18 Trail Study (COMM)
$20,000 COMM_Key
Delaware Upper Providence Township
Brookwood -‐ Lavin Tract
BRC-‐ACQ-‐9-‐214
$641,000 $300,000 9 Acquisition (COMM)
$2,332,100 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 257 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Delaware Upper Providence Township
Drexeline Property Acquisition
BRC-‐ACQ-‐13-‐238
$87,000 $87,000 13 Acquisition (COMM)
$181,400 COMM_Key
Delaware Yeadon Borough Community Park-‐Phase II
KEY-‐PRD-‐2-‐181
$60,060 $50,000 2 Park Rehabilitation and Development (COMM)
$120,720 COMM_Key
Delaware Yeadon Borough Peer-‐to-‐Peer BRC-‐TAG-‐10-‐10
$7,500 $7,500 10 Peer-‐to-‐Peer Tech. Assistance (COMM)
$8,250 COMM_Key
Delaware, Philadelphia
Radnor Township Valley Forge to Heinz Refuge Corridor Feasibility Study
BRC-‐TAG-‐18-‐160
$70,000 $45,000 18 Trail Study (COMM)
$140,000 COMM_Key
Elk Benezette Township Thunder Mountain -‐ Phase 3 Development
BRC-‐SC-‐12-‐81
$26,000 $26,000 12 Small Communities/Small Projects (COMM)
$32,000 COMM_Key
Elk Benezette Township Thunder Mountain -‐ Phase II
BRC-‐SC-‐9-‐19
$27,500 $27,000 9 Small Communities/Small Projects (COMM)
$35,000 COMM_Key
Elk Benezette Township Thunder Mountain Trail Parking
BRC-‐SC-‐8-‐22
$25,000 $25,000 8 Small Communities/Small Projects (COMM)
$30,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 258 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Elk Benzinger Township Municipal Golf Course Authority
Bavarian Hills Golf Course
KEY-‐PRD-‐2-‐10
$81,250 $81,200 2 Park Rehabilitation and Development (COMM)
$162,500 COMM_Key
Elk Benzinger Township Municipal Golf Course Authority
Parking Lot BRC-‐PRD-‐6-‐20
$39,650 $39,600 6 Park Rehabilitation and Development (COMM)
$79,300 COMM_Key
Elk Elk County Big Mill Creek -‐ Phase III
BRC-‐RCD-‐14-‐289
$262,000 $250,000 14 Development (RIV)
$654,400 COMM_Key
Elk Elk County Clarion River Phase II -‐ Dispersed Recreation
BRC-‐RCD-‐13.3-‐16
$107,700 $107,700 13.3 Development (RIV)
$217,900 RIVER_Key
Elk Elk County Clarion/Little Toby Trail
KEY-‐RTD-‐5-‐3
$80,000 $80,000 5 Rail Rehabilitation and Development (RT)
$808,600 RT_Key
Elk Elk County Clarion/Little Toby Trail Plan
BRC-‐RTD-‐11-‐16
$20,000 $20,000 11 Feasibility Studies (RT)
$40,000 RT_Key
Elk Fox Township Community Park BRC-‐PRD-‐6-‐68
$100,000 $100,000 6 Park Rehabilitation and Development (COMM)
$392,700 COMM_Key
Elk Fox Township Fox Twp. Parks Master Site Plan
BRC-‐TAG-‐13.6-‐594
$15,000 $15,000 13.6 Master Site Plans (COMM)
$30,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 259 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Elk Horton Township Township Park KEY-‐SC-‐4-‐67 $11,000 $11,000 4 Small Communities/Small Projects (COMM)
$12,000 COMM_Key
Elk Jay Township Park Master Plan BRC-‐TAG-‐8-‐92
$10,000 $10,000 8 Master Site Plans (COMM)
$20,000 COMM_Key
Elk Jay Township Recreational Park BRC-‐SC-‐10-‐85
$40,000 $40,000 10 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Elk Johnsonburg Borough
Community Park KEY-‐SC-‐1-‐64 $18,130 $18,100 1 Small Communities/Small Projects (COMM)
$20,850 COMM_Key
Elk Johnsonburg Borough
Community Park Phase II
KEY-‐SC-‐2-‐71 $19,997 $19,900 2 Small Communities/Small Projects (COMM)
$22,019 COMM_Key
Elk Jones Township Community Park BRC-‐SC-‐11-‐130
$36,000 $36,000 11 Small Communities/Small Projects (COMM)
$52,900 COMM_Key
Elk Jones Township Community Park BRC-‐SC-‐14-‐91
$34,900 $34,900 14 Small Communities/Small Projects (COMM)
$49,700 COMM_Key
Elk Jones Township Community Park -‐ Development
BRC-‐SC-‐17-‐40
$31,771 $32,000 17 Small Communities/Small Projects (COMM)
$43,542 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 260 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Elk Jones Township Community Park Concession Building
BRC-‐SC-‐9-‐104
$34,700 $34,000 9 Small Communities/Small Projects (COMM)
$49,500 COMM_Key
Elk Jones Township Jones Township Community Park
BRC-‐PRD-‐8-‐98
$40,000 $40,000 8 Park Rehabilitation and Development (COMM)
$82,500 COMM_Key
Elk Ridgway Borough O.B. Grant and Olson Parks
BRC-‐SC-‐7-‐163
$40,000 $40,000 7 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Elk Ridgway Borough Ridgway Riverfront Conservation & Development Plan
BRC-‐TAG-‐12.5-‐5
$60,000 $60,000 12.5 Master Site Plans (COMM)
$120,000 COMM_Key
Elk Ridgway Borough Ridgway Trailhead KEY-‐RTD-‐4-‐19
$20,000 $20,000 4 Rail Rehabilitation and Development (RT)
$40,000 RT_Key
Elk Ridgway Township Sandy Beach Park KEY-‐SC-‐5-‐172
$19,877 $19,900 5 Small Communities/Small Projects (COMM)
$55,013 COMM_Key
Elk Spring Creek Township
Clarion River River Road Access Area-‐Phase II
BRC-‐SC-‐13.3-‐264
$20,000 $20,000 13.3 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 261 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Elk St. Marys City Benzinger & Memorial Parks
BRC-‐PRD-‐7-‐181
$19,913 $20,000 7 Park Rehabilitation and Development (COMM)
$39,827 COMM_Key
Elk St. Marys City Benzinger and Luhr Parks
BRC-‐PRD-‐9-‐199
$21,500 $21,000 9 Park Rehabilitation and Development (COMM)
$43,000 COMM_Key
Elk St. Marys City Benzinger Park KEY-‐PRD-‐1-‐131
$35,000 $35,000 1 Park Rehabilitation and Development (COMM)
$71,690 COMM_Key
Elk St. Marys City Impact St. Marys BRC-‐TAG-‐13-‐209
$13,200 $13,200 13 Master Site Plans (COMM)
$26,400 COMM_Key
Elk St. Marys City Tennis & Basketball Court Rehab
BRC-‐PRD-‐11-‐86
$41,000 $41,000 11 Park Rehabilitation and Development (COMM)
$82,100 COMM_Key
Elk Tri County Rails To Trails Association
Clarion-‐Little Toby Rail Trail
BRC-‐RTD-‐12-‐14
$75,000 $75,000 12 Rail Rehabilitation and Development (RT)
$150,000 RT_Key
Elk Western Pennsylvania Conservancy
Rowe Tract Acquisition (Bennett Branch Access)
BRC-‐LTA-‐18-‐21
$41,000 $41,000 18 Open Space Acquisition (LT)
$133,150 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 262 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Elk Western Pennsylvania Conservancy
Winslow Hill BRC-‐LTA-‐6-‐23
$116,000 $25,000 6 Critical Habitat Acquisition (LT)
$231,000 LT_Key
Elk, Forest, Jefferson
Lumber Heritage Region of PA, Inc.
Clarion River Signage and Access Improvements
BRC-‐RCI-‐13-‐17
$36,000 $36,000 13 Implementation (RIV)
$72,000 RIVER_Key
Erie Albion Borough Albion Borough Playground
BRC-‐SC-‐7-‐8 $40,000 $40,000 7 Small Communities/Small Projects (COMM)
$72,000 COMM_Key
Erie Albion Borough Borough Park KEY-‐PRD-‐4-‐7
$25,500 $25,500 4 Park Rehabilitation and Development (COMM)
$51,000 COMM_Key
Erie Cranesville Borough Borough Park BRC-‐SC-‐11-‐114
$20,000 $20,000 11 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Erie Cranesville Borough Borough Park BRC-‐SC-‐6-‐46
$16,749 $16,800 6 Small Communities/Small Projects (COMM)
$19,749 COMM_Key
Erie East Erie Suburban Recreation & Conservation Authority
Parking Area Improvement
BRC-‐PRD-‐11-‐27
$19,000 $19,000 11 Park Rehabilitation and Development (COMM)
$38,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 263 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Erie East Erie Suburban Recreation & Conservation Authority
Tri-‐Community Swimming Pool
KEY-‐PRD-‐5-‐54
$60,500 $60,500 5 Park Rehabilitation and Development (COMM)
$121,000 COMM_Key
Erie Edinboro Borough Nature's Outlet KEY-‐ACQ-‐2-‐44
$53,500 $50,000 2 Acquisition (COMM)
$107,000 COMM_Key
Erie Edinboro Borough Pool Feasibility Study/Master Site Plan
BRC-‐TAG-‐10-‐152
$10,000 $10,000 10 Feasibility Studies (COMM)
$20,000 COMM_Key
Erie Elk Creek Township Wellsburg Park KEY-‐SC-‐4-‐55 $13,041 $13,000 4 Small Communities/Small Projects (COMM)
$13,041 COMM_Key
Erie Erie City Columbus Park KEY-‐PRD-‐5-‐61
$50,000 $50,000 5 Park Rehabilitation and Development (COMM)
$100,000 COMM_Key
Erie Erie City Community Gateway Garden
KEY-‐PRD-‐5-‐62
$10,000 $10,000 5 Park Rehabilitation and Development (COMM)
$20,000 COMM_Key
Erie Erie City Eastside Greenway Plan
BRC-‐TAG-‐10-‐153
$25,000 $25,000 10 Greenway Plans (COMM)
$50,000 COMM_Key
Erie Erie City Gridley Park-‐ Development
BRC-‐PRD-‐16-‐133
$50,000 $50,000 16 Park Rehabilitation and Development (COMM)
$100,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 264 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Erie Erie City Griswold Park and Plaza
BRC-‐PRD-‐13-‐103
$450,000 $450,000 13 Park Rehabilitation and Development (COMM)
$900,000 COMM_Key
Erie Erie City McClelland Park Master Site Plan
BRC-‐TAG-‐12-‐236
$12,500 $12,500 12 Master Site Plans (COMM)
$25,000 COMM_Key
Erie Erie City Skate Park BRC-‐PRD-‐11-‐30
$82,900 $82,900 11 Park Rehabilitation and Development (COMM)
$166,500 COMM_Key
Erie Erie City TreeVitalize Erie BRC-‐TV-‐14-‐2
$42,685 $42,500 14 Park Rehabilitation and Development (COMM)
$100,278 COMM_Key
Erie Erie County Rail-‐Trail Feasibility Study
BRC-‐RTP-‐7-‐3
$15,000 $15,000 7 Feasibility Studies (RT)
$30,000 RT_Key
Erie Erie County Sixmile Creek Park Master Site Plan
BRC-‐TAG-‐11-‐205
$12,500 $12,500 11 Master Site Plans (COMM)
$25,000 COMM_Key
Erie Erie County Conservation District
Headwaters Conservation Park
BRC-‐PRD-‐11-‐31
$32,500 $30,000 11 Park Rehabilitation and Development (COMM)
$75,300 COMM_Key
Erie Erie County Convention Center Authority
West Canal Basin BRC-‐PRD-‐14-‐132
$55,000 $55,000 14 Park Rehabilitation and Development (COMM)
$110,100 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 265 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Erie Erie County Convention Center Authority
West Canal Basin-‐ Phase 2-‐ Development
BRC-‐PRD-‐16-‐134
$40,800 $40,800 16 Park Rehabilitation and Development (COMM)
$140,800 COMM_Key
Erie Erie Zoological Society
Erie Zoo KEY-‐PRD-‐2-‐46
$165,000 $165,000 2 Park Rehabilitation and Development (COMM)
$330,000 COMM_Key
Erie Erie Zoological Society
Tiger Exhibit BRC-‐PRD-‐13-‐104
$150,000 $150,000 13 Park Rehabilitation and Development (COMM)
$300,000 COMM_Key
Erie Erie Zoological Society
Zoo Development -‐ Phase V
KEY-‐ZOO-‐94-‐1
$412,500 $412,500 1 Zoo $825,000 COMM_Key
Erie Erie-‐Western Pennsylvania Port Authority
Bayfront Overlook Greenway Study
BRC-‐TAG-‐6-‐60
$50,000 $50,000 6 Greenway Plans (COMM)
$100,000 COMM_Key
Erie Erie-‐Western Pennsylvania Port Authority
Comprehensive Waterfront Plan
BRC-‐TAG-‐13.3-‐470
$50,000 $40,000 13.3 Master Site Plans (COMM)
$100,000 COMM_Key
Erie Erie-‐Western Pennsylvania Port Authority
Lampe Marina Campground
BRC-‐PRD-‐7-‐68
$75,000 $75,000 7 Park Rehabilitation and Development (COMM)
$200,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 266 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Erie Erie-‐Western Pennsylvania Port Authority
Lampe-‐Marina Campground -‐ Phase 2
BRC-‐PRD-‐12-‐153
$148,300 $148,000 12 Park Rehabilitation and Development (COMM)
$296,500 COMM_Key
Erie Erie-‐Western Pennsylvania Port Authority
Liberty Park -‐ Phases 2 & 3
KEY-‐PRD-‐5-‐63
$64,024 $64,000 5 Park Rehabilitation and Development (COMM)
$128,048 COMM_Key
Erie Erie-‐Western Pennsylvania Port Authority
Liberty Park-‐ Development
BRC-‐PRD-‐16-‐135
$100,000 $100,000 16 Park Rehabilitation and Development (COMM)
$400,000 COMM_Key
Erie Erie-‐Western Pennsylvania Port Authority
Liberty Park, Phase IV-‐Observation Platforms
BRC-‐PRD-‐8-‐65
$50,000 $50,000 8 Park Rehabilitation and Development (COMM)
$100,000 COMM_Key
Erie Erie-‐Western Pennsylvania Port Authority
Perry's Landing Park/Seaway Bike Trail
KEY-‐PRD-‐3-‐61
$485,080 $425,000 3 Park Rehabilitation and Development (COMM)
$970,160 COMM_Key
Erie Erie-‐Western Pennsylvania Port Authority
Seaway Trail Extension -‐ Phase I & Phase II
BRC-‐PRD-‐13.3-‐358
$375,000 $200,000 13.3 Park Rehabilitation and Development (COMM)
$750,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 267 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Erie Erie-‐Western Pennsylvania Port Authority
West Bayfront Bikeway Connector
BRC-‐PRD-‐8-‐66
$50,000 $50,000 8 Park Rehabilitation and Development (COMM)
$350,000 COMM_Key
Erie Fairview Township Avonia Beach Park BRC-‐PRD-‐14-‐139
$421,000 $200,000 14 Park Rehabilitation and Development (COMM)
$842,000 COMM_Key
Erie Fairview Township Brugger Property Acquisition
BRC-‐ACQ-‐11.5-‐6
$425,000 $375,000 11.5 Acquisition (COMM)
$950,000 COMM_Key
Erie Fairview Township Master Site Development Plan
KEY-‐TAG-‐3-‐62
$13,500 $13,500 3 Master Site Plans (COMM)
$27,000 COMM_Key
Erie Fairview Township Pleasant Ridge Park BRC-‐PRD-‐7-‐71
$51,812 $52,000 7 Park Rehabilitation and Development (COMM)
$103,625 COMM_Key
Erie Girard Township Elk Creek Access KEY-‐SC-‐4-‐63 $20,000 $20,000 4 Small Communities/Small Projects (COMM)
$32,500 COMM_Key
Erie Girard Township Elk Creek Safe Aerial Photography and Mapping
BRC-‐TAG-‐9-‐85
$11,600 $11,500 9 Master Site Plans (COMM)
$23,300 COMM_Key
Erie Girard Township Miller Property Acquisition
BRC-‐ACQ-‐12.5-‐33
$75,600 $73,000 12.5 Acquisition (COMM)
$151,200 COMM_Key
Erie Greenfield Township Township Park KEY-‐ACQ-‐5-‐75
$9,850 $9,800 5 Acquisition (COMM)
$19,700 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 268 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Erie Greenfield Township Walking/ADA/Exercise Trail -‐ Greenfield Comm. Park
BRC-‐SC-‐8-‐79
$33,400 $33,000 8 Small Communities/Small Projects (COMM)
$46,900 COMM_Key
Erie Harborcreek Township
Shades Beach Offshore Improvements
BRC-‐PRD-‐11-‐41
$200,000 $700,000 11 Park Rehabilitation and Development (COMM)
$2,150,000 COMM_Key
Erie Harborcreek Township
Shades Beach Park BRC-‐PRD-‐6-‐78
$40,000 $40,000 6 Park Rehabilitation and Development (COMM)
$80,000 COMM_Key
Erie Harborcreek Township Shorewood Park Land Acquisition
BRC-ACQ-19-9
$88,275.00 $88,000.00 19 Acquisition (COMM)
$176,550.00 COMM_Key
Erie Harborcreek Township Shorewood Park Land Acquisition
BRC-ACQ-19-9
$88,275.00 $88,000.00 19 Acquisition (COMM)
$176,550.00 COMM_Key
Erie Harborcreek Township Shorewood Park Land Acquisition
BRC-ACQ-19-9
$88,275.00 $88,000.00 19 Acquisition (COMM)
$176,550.00 COMM_Key
Erie Lake City Borough Miles Grove Park -‐ Phase I
KEY-‐PRD-‐5-‐105
$50,000 $50,000 5 Park Rehabilitation and Development (COMM)
$134,000 COMM_Key
Erie Lake Erie Region Conservancy
Allison Property Conservation Easement Acquisition
BRC-‐LTA-‐13.6-‐611
$550,000 $550,000 13.6 Open Space Acquisition (LT)
$1,109,600 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 269 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Erie Lake Erie Region Conservancy
Holzhausen Property Conservation Easement
BRC-‐LTA-‐16-‐32
$246,900 $246,900 16 Open Space Acquisition (LT)
$493,800 LT_Key
Erie Lake Erie Region Conservancy
Jenks Property Acquisition
BRC-‐LTA-‐13.3-‐518
$101,900 $101,800 13.3 Open Space Acquisition (LT)
$203,700 LT_Key
Erie Lake Erie Region Conservancy
Lake Erie Watershed Conservation Plan
BRC-‐RCP-‐8-‐26
$183,000 $175,000 8 Planning (RIV) $407,900 RIVER_Key
Erie Lake Erie Region Conservancy
Rand Property Acquisition
BRC-‐LTA-‐14-‐32
$146,200 $146,000 14 Critical Habitat Acquisition (LT)
$292,400 LT_Key
Erie Lawrence Park Township
Barringer Playground BRC-‐SC-‐6-‐93
$20,000 $20,000 6 Small Communities/Small Projects (COMM)
$51,100 COMM_Key
Erie Lawrence Park Township
Fourmile Creek Fish Ladder Installation
BRC-‐RCD-‐13-‐510
$52,500 $52,500 13 Development (RIV)
$105,000 RIVER_Key
Erie Lawrence Park Township
Lakeclif, Napier and Teker Parks - Development
BRC-PRD-19-90
$267,100.00 $267,100.00 19 Park Rehabilitation and Development (COMM)
$534,200.00 COMM_Key
Erie Lawrence Park Township
Lakeclif, Napier and Teker Parks - Development
BRC-PRD-19-90
$267,100.00 $267,100.00 19 Park Rehabilitation and Development (COMM)
$534,200.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 270 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Erie Lawrence Park Township
Lakeclif, Napier and Teker Parks - Development
BRC-PRD-19-90
$267,100.00 $267,100.00 19 Park Rehabilitation and Development (COMM)
$534,200.00 COMM_Key
Erie Lawrence Park Township
Napier Park Master Site Plan
BRC-‐TAG-‐16-‐60
$15,750 $15,700 16 Master Site Plans (COMM)
$31,500 COMM_Key
Erie McKean Recreation Authority
McKean Community Park
KEY-‐PRD-‐1-‐80
$34,700 $34,700 1 Park Rehabilitation and Development (COMM)
$91,700 COMM_Key
Erie McKean Recreation Authority
McKean Community Park
KEY-‐SC-‐3-‐130
$20,000 $20,000 3 Small Communities/Small Projects (COMM)
$22,000 COMM_Key
Erie McKean Township Master Site/Trail Network Plan
BRC-TAG-19-137
$12,500.00 $12,500.00 19 Master Site Plans (COMM)
$26,500.00 COMM_Key
Erie McKean Township Master Site/Trail Network Plan
BRC-TAG-19-137
$12,500.00 $12,500.00 19 Master Site Plans (COMM)
$26,500.00 COMM_Key
Erie McKean Township Master Site/Trail Network Plan
BRC-TAG-19-137
$12,500.00 $12,500.00 19 Master Site Plans (COMM)
$26,500.00 COMM_Key
Erie Millcreek Township Asbury Community Park
BRC-‐PRD-‐6-‐113
$100,000 $100,000 6 Park Rehabilitation and Development (COMM)
$200,000 COMM_Key
Erie Millcreek Township Belle Valley Swimming Pool
KEY-‐PRD-‐2-‐100
$250,000 $250,000 2 Park Rehabilitation and Development (COMM)
$610,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 271 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Erie Millcreek Township Cassidy Park Master Plan
BRC-‐TAG-‐12-‐251
$12,500 $12,500 12 Master Site Plans (COMM)
$25,000 COMM_Key
Erie Millcreek Township Cassidy Property Acquisition
BRC-‐ACQ-‐11.5-‐11
$217,000 $217,000 11.5 Acquisition (COMM)
$433,900 COMM_Key
Erie Millcreek Township Chestnut Hill Playground
KEY-‐PRD-‐4-‐103
$25,000 $25,000 4 Park Rehabilitation and Development (COMM)
$50,000 COMM_Key
Erie Millcreek Township Greenway Plan KEY-‐TAG-‐3-‐138
$17,700 $17,700 3 Greenway Plans (COMM)
$35,400 COMM_Key
Erie Millcreek Township Millcreek Township Golf Course
BRC-‐PRD-‐8-‐119
$200,000 $200,000 8 Park Rehabilitation and Development (COMM)
$2,900,200 COMM_Key
Erie Millcreek Township Veterans Park -‐ Phase 1 -‐ Development
BRC-‐PRD-‐16-‐146
$103,197 $104,000 16 Park Rehabilitation and Development (COMM)
$349,045 COMM_Key
Erie Millcreek Township Veterans Park -‐ Phase 2 -‐ Development
BRC-‐PRD-‐17-‐138
$101,585 $101,500 17 Park Rehabilitation and Development (COMM)
$203,170 COMM_Key
Erie Millcreek Township Zimmerly Road Park BRC-‐RCD-‐14-‐295
$100,000 $100,000 14 Development (RIV)
$400,000 RIVER_Key
Keystone Fund Projects by County (1994-‐2013)
Page 272 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Erie North East Borough Heard Memorial Park
BRC-‐PRD-‐7-‐138
$150,000 $150,000 7 Park Rehabilitation and Development (COMM)
$302,000 COMM_Key
Erie North East Township Semelka/Hoyt Land Acquisition
BRC-‐ACQ-‐12-‐75
$70,300 $63,000 12 Acquisition (COMM)
$140,600 COMM_Key
Erie Northwest Pennsylvania Trail Association
Corry Junction Rail Trail Construction
BRC-‐RTD-‐13.3-‐502
$375,000 $175,000 13.3 Rail Rehabilitation and Development (RT)
$750,000 RT_Key
Erie Paddle Without Pollution
Presque Isle State Park Water Trail
BRC-‐TAG-‐18-‐159
$18,650 $18,600 18 Trail Study (COMM)
$37,300 RIVER_Key
Erie Springfield Township Lakefront Parks Master Site Plans
BRC-‐TAG-‐13.3-‐495
$30,000 $30,000 13.3 Master Site Plans (COMM)
$72,000 COMM_Key
Erie Springfield Township Raccoon Creek Park -‐ Development
BRC-‐PRD-‐17-‐152
$152,800 $152,000 17 Park Rehabilitation and Development (COMM)
$310,300 COMM_Key
Erie Summit Township Picnicana Park KEY-‐PRD-‐3-‐210
$50,950 $50,000 3 Park Rehabilitation and Development (COMM)
$101,900 COMM_Key
Erie Union City Borough Caflisch, Tot Lot and SW Parks
KEY-‐SC-‐1-‐139
$18,876 $18,900 1 Small Communities/Small Projects (COMM)
$39,252 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 273 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Erie Venango Township Community Park KEY-‐SC-‐4-‐161
$20,000 $20,000 4 Small Communities/Small Projects (COMM)
$25,900 COMM_Key
Erie Washington Township
Memorial Park BRC-‐TAG-‐7-‐202
$12,500 $12,500 7 Master Site Plans (COMM)
$25,000 COMM_Key
Erie Washington Township
Wainer Park BRC-‐PRD-‐9-‐223
$69,300 $69,000 9 Park Rehabilitation and Development (COMM)
$138,600 COMM_Key
Erie Wattsburg Borough Harwood Tri-‐Community Park
KEY-‐SC-‐5-‐216
$20,000 $20,000 5 Small Communities/Small Projects (COMM)
$26,289 COMM_Key
Erie Western Pennsylvania Conservancy
Lake Pleasant BRC-‐LTA-‐7-‐22
$136,000 $136,000 7 Critical Habitat Acquisition (LT)
$272,000 LT_Key
Erie Western Pennsylvania Conservancy
Lake Pleasant Natural Area
KEY-‐LTA-‐1-‐17
$125,000 $125,000 1 Critical Habitat Acquisition (LT)
$250,000 LT_Key
Erie Western Pennsylvania Conservancy
Lake Pleasant Natural Area
KEY-‐LTA-‐5-‐21
$48,775 $45,000 5 Critical Habitat Acquisition (LT)
$97,550 LT_Key
Erie Western Pennsylvania Conservancy
Lowville Fen KEY-‐LTA-‐2-‐14
$123,000 $123,000 2 Critical Habitat Acquisition (LT)
$246,000 LT_Key
Erie Western Pennsylvania Conservancy
Reliant Energy Tract (Coho)
BRC-‐LTA-‐10-‐1
$1,500,000 $1,500,000 10 Open Space Acquisition (LT)
$3,000,000 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 274 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Erie Western Pennsylvania Conservancy
Roderick Wildlife Reserve Expansion
BRC-‐LTA-‐16-‐87
$250,000 $250,000 16 Open Space Acquisition (LT)
$723,990 LT_Key
Erie Western Pennsylvania Conservancy
Volkman Tract Acquisition
BRC-‐LTA-‐13-‐26
$124,600 $86,000 13 Critical Habitat Acquisition (LT)
$249,100 LT_Key
Fayette Brownsville Area Revitalization Corporation
Brownsville Steamboat Museum
KEY-‐RCI-‐5-‐14
$50,000 $60,000 5 Implementation (RIV)
$100,000 RIVER_Key
Fayette Brownsville Borough Community Gateways and Gardens
KEY-‐SC-‐4-‐20 $12,100 $12,100 4 Small Communities/Small Projects (COMM)
$24,100 COMM_Key
Fayette Brownsville Borough Community Park BRC-‐PRD-‐6-‐25
$30,600 $30,000 6 Park Rehabilitation and Development (COMM)
$80,000 COMM_Key
Fayette Brownsville Borough Fenwick Park KEY-‐SC-‐1-‐21 $20,000 $20,000 1 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Fayette Brownsville Borough Fenwick Park Improvement
BRC-‐SC-‐9-‐36
$33,400 $33,000 9 Small Communities/Small Projects (COMM)
$47,900 COMM_Key
Fayette Brownsville Borough Monongahela River Watershed Plan
KEY-‐RCP-‐95-‐11
$20,000 $20,000 1 Planning (RIV) $41,000 RIVER_Key
Fayette Brownsville Borough Riverside Wharf Park -‐ Phase II
BRC-‐RCD-‐8-‐22
$125,000 $125,000 8 Development (RIV)
$403,700 RIVER_Key
Keystone Fund Projects by County (1994-‐2013)
Page 275 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Fayette Bullskin Township Jacob's Creek Park KEY-‐PRD-‐3-‐26
$88,139 $50,000 3 Park Rehabilitation and Development (COMM)
$176,278 COMM_Key
Fayette Connellsville City East Park BRC-‐PRD-‐6-‐44
$275,000 $225,000 6 Park Rehabilitation and Development (COMM)
$550,000 COMM_Key
Fayette Connellsville City Gateway to Gateway on the GAP in Connellsville
BRC-‐TAG-‐13.6-‐591
$100,000 $100,000 13.6 Master Site Plans (COMM)
$220,000 COMM_Key
Fayette Connellsville City Yough River Park BRC-‐PRD-‐15-‐56
$204,500 $204,500 15 Park Rehabilitation and Development (COMM)
$409,000 COMM_Key
Fayette Dunbar Borough Community Park BRC-‐SC-‐10-‐74
$25,500 $25,000 10 Small Communities/Small Projects (COMM)
$33,000 COMM_Key
Fayette Fayette County Fayette County Parks BRC-‐PRD-‐7-‐73
$53,542 $45,000 7 Park Rehabilitation and Development (COMM)
$110,728 COMM_Key
Fayette Fayette County Feasibility Study KEY-‐RTP-‐3-‐7 $15,000 $15,000 3 Feasibility Studies (RT)
$30,000 RT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 276 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Fayette Fayette County German-‐Masontown Park
KEY-‐PRD-‐3-‐64
$13,800 $13,800 3 Park Rehabilitation and Development (COMM)
$27,600 COMM_Key
Fayette Fayette County German/Masontown Park
BRC-‐PRD-‐9-‐75
$22,000 $22,000 9 Park Rehabilitation and Development (COMM)
$44,100 COMM_Key
Fayette Fayette County Natural Heritage Inventory
KEY-‐TAG-‐3-‐63
$40,400 $40,000 3 Natural Areas Inventories (COMM)
$80,800 COMM_Key
Fayette Fayette County Sheepskin Trail - Point Marion Segment - Development
BRC-RTD-19-152
$150,000.00 $150,000.00 19 Rail Rehabilitation and Development (RT)
$328,461.00 COMM_Key
Fayette Fayette County Sheepskin Trail - Point Marion Segment - Development
BRC-RTD-19-152
$150,000.00 $150,000.00 19 Rail Rehabilitation and Development (RT)
$328,461.00 COMM_Key
Fayette Fayette County Sheepskin Trail - Point Marion Segment - Development
BRC-RTD-19-152
$150,000.00 $150,000.00 19 Rail Rehabilitation and Development (RT)
$328,461.00 COMM_Key
Fayette Fayette County Sheepskin Trail - Point Marion Segment - Development
BRC-RTD-19-152
$150,000.00 $150,000.00 19 Rail Rehabilitation and Development (RT)
$328,461.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 277 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Fayette Fayette County Sheepskin Trail North
BRC-‐RTD-‐10-‐7
$55,000 $55,000 10 Rail Rehabilitation and Development (RT)
$110,000 RT_Key
Fayette Franklin Township Franklin Community Swimming Pool
BRC-‐PRD-‐14-‐141
$561,400 $550,000 14 Park Rehabilitation and Development (COMM)
$1,122,800 COMM_Key
Fayette Henry Clay Township Community Park BRC-‐SC-‐10-‐81
$24,421 $24,000 10 Small Communities/Small Projects (COMM)
$40,000 COMM_Key
Fayette Henry Clay Township Community Park KEY-‐ACQ-‐3-‐87
$19,200 $19,200 3 Acquisition (COMM)
$38,400 COMM_Key
Fayette Henry Clay Township Henry Clay Community Park
BRC-‐TAG-‐7-‐84
$8,750 $8,700 7 Master Site Plans (COMM)
$17,400 COMM_Key
Fayette Henry Clay Township Henry Clay Township Park -‐ Phase I
BRC-‐SC-‐8-‐85
$30,000 $30,000 8 Small Communities/Small Projects (COMM)
$40,000 COMM_Key
Fayette Jefferson Township Jack Freeman Memorial Park
BRC-‐SC-‐7-‐93
$20,000 $20,000 7 Small Communities/Small Projects (COMM)
$20,500 COMM_Key
Fayette Jefferson Township Jack Freeman Park BRC-‐SC-‐12-‐101
$21,000 $21,000 12 Small Communities/Small Projects (COMM)
$24,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 278 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Fayette Jefferson Township Jefferson Township Park - Development
BRC-SC-19-42
$30,000.00 $30,000.00 19 Small Communities/Small Projects (COMM)
$40,000.00 COMM_Key
Fayette Jefferson Township Jefferson Township Park - Development
BRC-SC-19-42
$30,000.00 $30,000.00 19 Small Communities/Small Projects (COMM)
$40,000.00 COMM_Key
Fayette Jefferson Township Jefferson Township Park - Development
BRC-SC-19-42
$30,000.00 $30,000.00 19 Small Communities/Small Projects (COMM)
$40,000.00 COMM_Key
Fayette Luzerne Township Monongahela River Boat Docks (E. Fredericktown)
KEY-‐RCD-‐5-‐15
$14,000 $14,000 5 Development (RIV)
$28,000 RIVER_Key
Fayette Luzerne Township Patsy Hillman Park MSP
BRC-‐TAG-‐10-‐158
$45,000 $45,000 10 Master Site Plans (COMM)
$90,000 COMM_Key
Fayette Markleysburg Borough
Borough Park KEY-‐SC-‐5-‐124
$19,902 $20,000 5 Small Communities/Small Projects (COMM)
$19,902 COMM_Key
Fayette Masontown Borough
Jefferson Avenue Park
KEY-‐SC-‐5-‐125
$20,000 $20,000 5 Small Communities/Small Projects (COMM)
$21,377 COMM_Key
Fayette Masontown Borough
Redwood Street and Jefferson Avenue Parks
BRC-‐SC-‐8-‐115
$20,000 $28,000 8 Small Communities/Small Projects (COMM)
$36,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 279 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Fayette Masontown Borough
Redwood Street Park BRC-‐SC-‐6-‐108
$20,000 $20,000 6 Small Communities/Small Projects (COMM)
$20,700 COMM_Key
Fayette Menallen Township Township Playground
KEY-‐SC-‐3-‐132
$19,400 $19,400 3 Small Communities/Small Projects (COMM)
$23,300 COMM_Key
Fayette Newell Borough 2nd St. Park, 4th St. Park, & Mun. Park
KEY-‐SC-‐2-‐111
$19,852 $19,800 2 Small Communities/Small Projects (COMM)
$21,402 COMM_Key
Fayette Ohiopyle Borough "Stewart on the Green" Playground
BRC-‐PRD-‐13.3-‐314
$48,000 $262,500 13.3 Small Communities/Small Projects (COMM)
$600,000 COMM_Key
Fayette Ohiopyle Borough "Stewart Place on the Green"
KEY-‐SC-‐5-‐153
$17,000 $17,000 5 Small Communities/Small Projects (COMM)
$14,882 COMM_Key
Fayette Perry Township Star Junction Memorial Park Development
BRC-‐SC-‐12-‐115
$20,900 $23,900 12 Small Communities/Small Projects (COMM)
$25,500 COMM_Key
Fayette Perry Township Whitsett Park BRC-‐SC-‐14-‐100
$38,800 $38,000 14 Small Communities/Small Projects (COMM)
$57,600 COMM_Key
Fayette Perryopolis Borough Perryopolis Rail-‐Trail Project
KEY-‐RTP-‐5-‐12
$5,000 $5,000 5 Feasibility Studies (RT)
$10,000 RT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 280 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Fayette Perryopolis Parks and Recreation Authority
Sampey Park BRC-‐SC-‐6-‐237
$20,000 $20,000 6 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Fayette Point Marion Borough
Community Park BRC-‐SC-‐11-‐149
$40,000 $40,000 11 Small Communities/Small Projects (COMM)
$66,000 COMM_Key
Fayette Point Marion Borough
Community Park Enhancement -‐ Phase Two
BRC-‐PRD-‐12-‐283
$179,800 $179,000 12 Park Rehabilitation and Development (COMM)
$359,600 COMM_Key
Fayette Point Marion Borough
Point Marion Park KEY-‐SC-‐3-‐179
$20,000 $20,000 3 Small Communities/Small Projects (COMM)
$23,200 COMM_Key
Fayette Redstone Township Redstone Park BRC-‐PRD-‐6-‐157
$68,800 $30,000 6 Park Rehabilitation and Development (COMM)
$137,600 COMM_Key
Fayette Redstone Township Rotary Park KEY-‐PRD-‐1-‐114
$10,000 $10,000 1 Park Rehabilitation and Development (COMM)
$20,000 COMM_Key
Fayette Saltlick Township Indian Creek Valley Trail
KEY-‐SC-‐1-‐122
$18,000 $18,000 1 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 281 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Fayette Saltlick Township Indian Creek Valley Trail
KEY-‐SC-‐4-‐134
$20,000 $20,000 4 Small Communities/Small Projects (COMM)
$22,138 COMM_Key
Fayette Saltlick Township Melcroft Trestle Access
KEY-‐SC-‐2-‐134
$20,000 $20,000 2 Small Communities/Small Projects (COMM)
$22,000 COMM_Key
Fayette South Connellsville Borough
Borough Park KEY-‐SC-‐1-‐128
$20,000 $20,000 1 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Fayette South Union Township
Two Sites KEY-‐PRD-‐4-‐145
$67,139 $65,000 4 Park Rehabilitation and Development (COMM)
$134,278 COMM_Key
Fayette Springfield Township Mill Run Park BRC-‐SC-‐8-‐186
$27,000 $27,000 8 Small Communities/Small Projects (COMM)
$34,000 COMM_Key
Fayette Springhill Township Georges Creek Watershed Conservation Plan
BRC-‐RCP-‐8-‐21
$20,000 $20,000 8 Planning (RIV) $40,000 RIVER_Key
Fayette Uniontown City Bailey Park-‐Development
BRC-‐PRD-‐17-‐156
$102,366 $102,400 17 Park Rehabilitation and Development (COMM)
$242,729 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 282 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Fayette Washington Township
Municipal Park KEY-‐SC-‐2-‐168
$20,000 $20,000 2 Small Communities/Small Projects (COMM)
$27,000 COMM_Key
Fayette Washington Township
Washington Township Veterans' Park
BRC-‐SC-‐8-‐209
$30,000 $30,000 8 Small Communities/Small Projects (COMM)
$50,000 COMM_Key
Fayette Western Pennsylvania Conservancy
Bear Run Nature Reserve
BRC-‐LTA-‐9-‐23
$215,400 $215,000 9 Critical Habitat Acquisition (LT)
$430,800 LT_Key
Fayette Western Pennsylvania Conservancy
Forbes-‐Fort Necessity Connector Acquisition
BRC-‐LTA-‐18-‐20
$550,000 $550,000 18 Open Space Acquisition (LT)
$2,554,461 LT_Key
Fayette Western Pennsylvania Conservancy
Jones Tract Acquisition
BRC-‐LTA-‐13.3-‐535
$235,000 $221,000 13.3 Open Space Acquisition (LT)
$471,900 LT_Key
Fayette Western Pennsylvania Conservancy
Ruane Tract Acquisition
BRC-‐LTA-‐11-‐27
$336,000 $340,000 11 Open Space Acquisition (LT)
$680,000 LT_Key
Fayette Western Pennsylvania Conservancy
Ulderich Property KEY-‐LTA-‐1-‐16
$214,000 $100,000 1 Open Space Acquisition (LT)
$200,000 LT_Key
Fayette Wharton Township Recreational Park KEY-‐PRD-‐3-‐240
$26,200 $26,200 3 Park Rehabilitation and Development (COMM)
$52,400 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 283 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Fayette, Somerset
Western Pennsylvania Conservancy
Casselman River Recreation Guide
BRC-‐RCI-‐14-‐291
$43,500 $43,500 14 Implementation (RIV)
$87,000 RIVER_Key
Fayette, Westmoreland
Mountain Watershed Association, Inc.
Indian Creek Valley Bike Trail Feasibility Study
BRC-‐RTP-‐11-‐9
$18,900 $18,900 11 Feasibility Studies (RT)
$37,700 RT_Key
Forest Barnett Township Township Canoe Access
KEY-‐SC-‐3-‐10 $16,725 $23,099 3 Small Communities/Small Projects (COMM)
$17,825 COMM_Key
Forest Forest County Comprehensive County-‐wide GIS
BRC-‐TAG-‐10-‐154
$307,500 $90,000 10 Comp. Rec., Park, & Open Space Plans (COMM)
$429,600 COMM_Key
Forest Jenks Township MACA Park BRC-‐PRD-‐13.3-‐376
$158,665 $150,000 13.3 Park Rehabilitation and Development (COMM)
$308,665 COMM_Key
Forest Jenks Township Town Center Gazebo-‐ Development
BRC-‐SC-‐16-‐44
$20,000 $23,000 16 Small Communities/Small Projects (COMM)
$26,000 COMM_Key
Forest Tionesta Borough Borough Park KEY-‐SC-‐2-‐155
$15,460 $15,400 2 Small Communities/Small Projects (COMM)
$15,460 COMM_Key
Forest Tionesta Borough Community Recreation Center
BRC-‐SC-‐10-‐101
$40,000 $40,000 10 Small Communities/Small Projects (COMM)
$60,600 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 284 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Franklin Antrim Township Community Park BRC-‐PRD-‐6-‐12
$50,000 $50,000 6 Park Rehabilitation and Development (COMM)
$100,000 COMM_Key
Franklin Antrim Township Community Park -‐ Phase III
BRC-‐PRD-‐14-‐110
$236,700 $225,000 14 Park Rehabilitation and Development (COMM)
$473,400 COMM_Key
Franklin Chambersburg Borough
Chambersburg Comp. Rec. Plan/Master Site Plan
BRC-‐TAG-‐8-‐37
$22,500 $22,500 8 Comp. Rec., Park, & Open Space Plans (COMM)
$45,000 COMM_Key
Franklin Chambersburg Borough
Chambersburg Rail-‐Trail
BRC-‐RTD-‐10-‐2
$147,000 $50,000 10 Rail Rehabilitation and Development (RT)
$759,200 COMM_Key
Franklin Chambersburg Borough
Chambersburg Rail-‐Trail
BRC-‐RTD-‐10-‐2
$147,000 $97,000 10 Rail Rehabilitation and Development (RT)
$759,200 RT_Key
Franklin Chambersburg Borough
Feasibility Study KEY-‐RTP-‐3-‐2 $18,500 $18,500 3 Feasibility Studies (RT)
$37,000 RT_Key
Franklin Chambersburg Borough
Mike Waters Memorial Park -‐ Phase-‐2-‐Development
BRC-‐PRD-‐18-‐54
$150,000 $150,000 18 Park Rehabilitation and Development (COMM)
$324,999 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 285 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Franklin Franklin County Comprehensive Recreation, Park & Open Sp
KEY-‐TAG-‐3-‐70
$25,000 $25,000 3 Comp. Rec., Park, & Open Space Plans (COMM)
$50,000 COMM_Key
Franklin Franklin County Greenway and Open Space Plan
BRC-‐TAG-‐11-‐206
$37,500 $37,500 11 Greenway Plans (COMM)
$75,000 COMM_Key
Franklin Greencastle Area, Franklin County, Water Authority
Greencastle-‐Antrim School District Land Acquisiton
BRC-‐ACQ-‐13.3-‐278
$62,600 $62,000 13.3 Acquisition (COMM)
$125,300 COMM_Key
Franklin Greene Township Corker Hill Acquisition (Environmental Ed. Center)
BRC-‐ACQ-‐14-‐58
$340,205 $300,000 14 Acquisition (COMM)
$678,200 COMM_Key
Franklin Montgomery Township
Park Acquisition BRC-‐ACQ-‐8-‐121
$151,000 $145,000 8 Acquisition (COMM)
$302,000 COMM_Key
Franklin Quincy Township Fritz Land Acquisition
BRC-‐ACQ-‐15-‐47
$75,250 $75,000 15 Acquisition (COMM)
$150,500 COMM_Key
Franklin Quincy Township Municipal Park Master Site Plan
BRC-‐TAG-‐14-‐235
$12,500 $12,500 14 Master Site Plans (COMM)
$25,000 COMM_Key
Franklin Quincy Township Township Park-‐ Phase 1-‐ Development
BRC-‐PRD-‐16-‐155
$100,000 $100,000 16 Park Rehabilitation and Development (COMM)
$199,823 COMM_Key
Franklin Shippensburg Borough
Memorial Park Pool-‐Phase II
BRC-‐PRD-‐8-‐172
$47,000 $47,000 8 Park Rehabilitation and Development (COMM)
$118,800 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 286 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Franklin The Conservation Fund
Eagle Rock Land Acquisition
BRC-LTA-19-27
########## ########## 19 Open Space Acquisition (LT)
$3,750,000.00 LT_Key
Franklin The Conservation Fund
Eagle Rock Land Acquisition
BRC-LTA-19-27
########## ########## 19 Open Space Acquisition (LT)
$3,750,000.00 LT_Key
Franklin The Conservation Fund
Eagle Rock Land Acquisition
BRC-LTA-19-27
########## ########## 19 Open Space Acquisition (LT)
$3,750,000.00 LT_Key
Franklin Washington Township
Cantwell Land Acquisition
BRC-‐ACQ-‐16-‐28
$49,950 $41,900 16 Acquisition (COMM)
$102,850 COMM_Key
Franklin Washington Township
Master Site Development Plan
KEY-‐TAG-‐3-‐228
$10,000 $10,000 3 Master Site Plans (COMM)
$20,000 COMM_Key
Franklin Washington Township
Pine Hill Park Expansion
BRC-‐ACQ-‐7-‐203
$35,450 $35,000 7 Acquisition (COMM)
$70,900 COMM_Key
Franklin Washington Township
Pine Hill Recreation Area
BRC-‐PRD-‐8-‐208
$55,000 $55,000 8 Park Rehabilitation and Development (COMM)
$112,400 COMM_Key
Franklin Waynesboro Borough
Memorial Park-‐Development
BRC-‐PRD-‐15-‐73
$79,835 $50,000 15 Park Rehabilitation and Development (COMM)
$159,670 COMM_Key
Franklin Waynesboro Borough
Northside Pool Feasibility Study
KEY-‐TAG-‐3-‐229
$5,500 $5,500 3 Feasibility Studies (COMM)
$11,000 COMM_Key
Fulton McConnellsburg Borough
Lions Recreation Bldg. Feasibility Study
BRC-‐TAG-‐9-‐130
$12,500 $9,130 9 Feasibility Studies (COMM)
$25,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 287 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Fulton McConnellsburg Borough
Peer-‐to-‐Peer BRC-‐TAG-‐9-‐2
$7,500 $7,500 9 Peer-‐to-‐Peer Tech. Assistance (COMM)
$8,250 COMM_Key
Greene Greene County Dunkard Creek Watershed Cons. Plan
KEY-‐RCP-‐95-‐18
$14,200 $14,200 1 Planning (RIV) $28,400 RIVER_Key
Greene Greene County Industrial Development Authority
The Greene Trail KEY-‐RTD-‐5-‐6
$128,000 $80,000 5 Rail Rehabilitation and Development (RT)
$640,000 RT_Key
Greene Greensboro Borough Greensboro Canoe/Kayak Launch -‐ Development
BRC-‐PRD-‐17-‐122
$44,200 $44,200 17 Park Rehabilitation and Development (COMM)
$88,160 COMM_Key
Greene Greensboro Borough Greensboro Trail BRC-‐PRD-‐13-‐106
$586,000 $561,000 13 Park Rehabilitation and Development (COMM)
$1,172,000 COMM_Key
Greene Jefferson Township Community Park KEY-‐SC-‐2-‐70 $18,275 $18,200 2 Small Communities/Small Projects (COMM)
$18,500 COMM_Key
Greene Jefferson-‐Morgan Regional Council of Governments
Beagle Club Road & Route 188 Park Boat Launches -‐ Development
BRC-‐PRD-‐16-‐140
$126,560 $126,000 16 Park Rehabilitation and Development (COMM)
$253,120 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 288 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Greene Jefferson-‐Morgan Regional Council of Governments
Crawford Park and Clarksville Canoe/Kayak Launch -‐ Development
BRC-‐PRD-‐17-‐126
$119,600 $119,600 17 Park Rehabilitation and Development (COMM)
$239,660 COMM_Key
Greene Morris Township Morris Township Community Center
BRC-‐SC-‐8-‐122
$40,000 $40,000 8 Small Communities/Small Projects (COMM)
$64,000 COMM_Key
Greene Perry Township Community Park BRC-‐SC-‐9-‐164
$20,000 $20,000 9 Small Communities/Small Projects (COMM)
$42,000 COMM_Key
Greene Perry Township Community Park KEY-‐SC-‐2-‐119
$13,993 $14,000 2 Small Communities/Small Projects (COMM)
$17,840 COMM_Key
Greene Rices Landing Borough
Boat Docks BRC-‐SC-‐9-‐176
$19,900 $19,000 9 Small Communities/Small Projects (COMM)
$19,900 COMM_Key
Greene Southwestern Pennsylvania Water Authority
Wisecarver Recreation Area Master Site Plan
BRC-‐TAG-‐14-‐243
$25,000 $25,000 14 Master Site Plans (COMM)
$50,000 COMM_Key
Greene Southwestern Pennsylvania Water Authority
Wisecarver Recreation Area, Phase 1-‐Development
BRC-‐PRD-‐16-‐161
$100,000 $100,000 16 Park Rehabilitation and Development (COMM)
$200,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 289 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Greene Waynesburg Borough
Community Flower Garden
KEY-‐SC-‐5-‐217
$19,636 $20,000 5 Small Communities/Small Projects (COMM)
$19,636 COMM_Key
Greene Waynesburg Borough
Meadowlark Park BRC-‐SC-‐6-‐194
$20,000 $20,000 6 Small Communities/Small Projects (COMM)
$33,427 COMM_Key
Huntingdon Alexandria Borough Borough Park BRC-‐SC-‐10-‐189
$25,000 $25,000 10 Small Communities/Small Projects (COMM)
$30,000 COMM_Key
Huntingdon Alexandria Borough Canal Park BRC-‐SC-‐14-‐74
$31,600 $31,600 14 Small Communities/Small Projects (COMM)
$43,200 COMM_Key
Huntingdon Broad Top City Borough
Broad Top City Park Acquisition
BRC-‐ACQ-‐11-‐169
$62,300 $46,000 11 Acquisition (COMM)
$124,700 COMM_Key
Huntingdon Carbon Township Township Park BRC-‐SC-‐6-‐29
$20,000 $20,000 6 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Huntingdon Central Pennsylvania Conservancy
Thousand Steps KEY-‐LTA-‐4-‐3 $97,000 $95,000 4 Critical Habitat Acquisition (LT)
$194,000 LT_Key
Huntingdon Huntingdon Borough Feasibility Study for Swimming Pool
KEY-‐TAG-‐3-‐95
$5,500 $5,500 3 Feasibility Studies (COMM)
$11,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 290 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Huntingdon Huntingdon Borough Huntingdon Community Center Swimming Pool
BRC-‐PRD-‐7-‐88
$500,000 $350,000 7 Park Rehabilitation and Development (COMM)
$1,050,231 COMM_Key
Huntingdon Huntingdon Borough Portstown Park KEY-‐PRD-‐5-‐92
$45,255 $40,000 5 Park Rehabilitation and Development (COMM)
$132,355 COMM_Key
Huntingdon Huntingdon Borough Uptown Playground Improvements
BRC-‐PRD-‐11-‐44
$60,000 $55,000 11 Park Rehabilitation and Development (COMM)
$120,000 COMM_Key
Huntingdon Huntingdon Borough William Smith School Property Acquisition
BRC-‐ACQ-‐11.5-‐7
$80,000 $70,000 11.5 Acquisition (COMM)
$160,000 COMM_Key
Huntingdon Juniata Clean Water Partnership
Lower Trail Expansion & Mapleton Comm. Pk. Feasibility Study
BRC-‐RCI-‐13-‐5
$31,800 $31,800 13 Implementation (RIV)
$63,700 RIVER_Key
Huntingdon Mapleton Borough Community Park KEY-‐SC-‐4-‐92 $18,982 $19,000 4 Small Communities/Small Projects (COMM)
$27,532 COMM_Key
Huntingdon Marklesburg Borough
Borough Park KEY-‐SC-‐1-‐79 $20,000 $20,000 1 Small Communities/Small Projects (COMM)
$21,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 291 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Huntingdon Mount Union Borough
Borough Park BRC-‐SC-‐8-‐126
$27,000 $27,000 8 Small Communities/Small Projects (COMM)
$34,000 COMM_Key
Huntingdon Mount Union Borough
Riverside Park BRC-‐SC-‐9-‐143
$40,000 $40,000 9 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Huntingdon The Conservation Fund
Path Estate Acquisition
BRC-‐LTA-‐8-‐23
$176,000 $176,000 8 Critical Habitat Acquisition (LT)
$451,000 LT_Key
Huntingdon The Conservation Fund
Suppes Trust Property
BRC-‐LTA-‐6-‐7
$533,000 $500,000 6 Critical Habitat Acquisition (LT)
$1,217,000 LT_Key
Huntingdon Three Springs Borough
Borough Park- Development
BRC-SC-19-52
$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)
$60,000.00 COMM_Key
Huntingdon Three Springs Borough
Borough Park- Development
BRC-SC-19-52
$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)
$60,000.00 COMM_Key
Huntingdon Three Springs Borough
Borough Park- Development
BRC-SC-19-52
$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)
$60,000.00 COMM_Key
Huntingdon Three Springs Borough
Swimming Pool Improvements
KEY-‐PRD-‐1-‐134
$45,000 $45,000 1 Park Rehabilitation and Development (COMM)
$90,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 292 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Huntingdon Walker Township Township Park -‐ Phase I
KEY-‐SC-‐1-‐141
$20,000 $20,000 1 Small Communities/Small Projects (COMM)
$40,000 COMM_Key
Huntingdon Wood Township Township Park BRC-‐SC-‐10-‐105
$28,900 $29,000 10 Small Communities/Small Projects (COMM)
$37,771 COMM_Key
Indiana Blackleggs Watershed Association, Inc.
Memorial Park BRC-‐RCD-‐13-‐6
$66,600 $51,000 13 Development (RIV)
$133,200 RIVER_Key
Indiana Blairsville Borough Blairsville Community Park
BRC-‐SC-‐7-‐22
$35,400 $17,500 7 Small Communities/Small Projects (COMM)
$50,800 COMM_Key
Indiana Blairsville Borough Market Street Streetscape
BRC-‐PRD-‐11.5-‐17
$242,500 $200,000 11.5 Park Rehabilitation and Development (COMM)
$1,209,700 COMM_Key
Indiana Blairsville Borough Recreation Center KEY-‐PRD-‐3-‐21
$45,000 $45,000 3 Park Rehabilitation and Development (COMM)
$90,000 COMM_Key
Indiana Brush Valley Township
Township Park KEY-‐SC-‐4-‐21 $19,834 $19,800 4 Small Communities/Small Projects (COMM)
$26,634 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 293 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Indiana Brush Valley Township
Township Park Development
BRC-‐SC-‐12-‐85
$32,000 $32,000 12 Small Communities/Small Projects (COMM)
$44,000 COMM_Key
Indiana Center Township FMC Sports Complex Renovation
BRC-‐PRD-‐12-‐293
$84,200 $84,200 12 Park Rehabilitation and Development (COMM)
$181,500 COMM_Key
Indiana Cherry Tree Borough Cherry Tree Boat Launch
BRC-‐RCD-‐8-‐20
$25,000 $25,000 8 Development (RIV)
$50,100 RIVER_Key
Indiana Cherry Tree Borough Cherry Tree Park - Development
BRC-SC-19-35
$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)
$60,000.00 COMM_Key
Indiana Cherry Tree Borough Cherry Tree Park - Development
BRC-SC-19-35
$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)
$60,000.00 COMM_Key
Indiana Cherry Tree Borough Cherry Tree Park - Development
BRC-SC-19-35
$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)
$60,000.00 COMM_Key
Indiana Conemaugh Township
Pool Improvements BRC-‐PRD-‐12-‐141
$100,000 $100,000 12 Park Rehabilitation and Development (COMM)
$200,000 COMM_Key
Indiana Conemaugh Township
SCL Recreation Park KEY-‐SC-‐4-‐36 $20,000 $20,000 4 Small Communities/Small Projects (COMM)
$32,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 294 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Indiana Conemaugh Township
Swimming Pool Feasibility Study
BRC-‐TAG-‐8-‐49
$8,750 $8,500 8 Feasibility Studies (COMM)
$17,500 COMM_Key
Indiana Conemaugh Valley Conservancy, Inc.
Tunnelton Area -‐ West Penn Trail Acquisition
BRC-‐RTA-‐8-‐3
$148,500 $140,000 8 Acquisition (RT) $297,000 RT_Key
Indiana Homer City Borough Homer City Boat Lauch Park - Development
BRC-PRD-19-84
$43,051.00 $43,000.00 19 Park Rehabilitation and Development (COMM)
$86,612.00 COMM_Key
Indiana Homer City Borough Homer City Boat Lauch Park - Development
BRC-PRD-19-84
$43,051.00 $43,000.00 19 Park Rehabilitation and Development (COMM)
$86,612.00 COMM_Key
Indiana Homer City Borough Homer City Boat Lauch Park - Development
BRC-PRD-19-84
$43,051.00 $43,000.00 19 Park Rehabilitation and Development (COMM)
$86,612.00 COMM_Key
Indiana Homer City Borough Hoodlebug Trail BRC-‐PRD-‐13-‐373
$130,100 $130,000 13 Park Rehabilitation and Development (COMM)
$261,700 COMM_Key
Indiana Homer City Borough In-‐Town Park KEY-‐SC-‐3-‐91 $10,000 $10,000 3 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Indiana Indiana County Blacklick Valley Natural Area Acquisition
BRC-‐ACQ-‐10-‐184
$35,700 $35,000 10 Acquisition (COMM)
$71,300 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 295 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Indiana Indiana County Blairsville Secondary Trail
BRC-‐RTD-‐9-‐14
$100,000 $100,000 9 Rail Rehabilitation and Development (RT)
$660,000 RT_Key
Indiana Indiana County Blue Spruce County Park Expansion
BRC-‐ACQ-‐8-‐87
$91,500 $90,000 8 Acquisition (COMM)
$183,000 COMM_Key
Indiana Indiana County County Regional Trail Connectivity Study
BRC-‐TAG-‐13.6-‐595
$22,500 $22,500 13.6 Trail Study (COMM)
$45,000 COMM_Key
Indiana Indiana County Ghost Town Trail KEY-‐RTD-‐95-‐17
$24,500 $24,500 1 Rail Rehabilitation and Development (RT)
$49,000 RT_Key
Indiana Indiana County Ghost Town Trail Extension, Phase 3
BRC-‐PRD-‐12-‐160
$210,000 $222,000 12 Park Rehabilitation and Development (COMM)
$1,314,000 COMM_Key
Indiana Indiana County Hoodlebug Trail -‐ SR 3035 Underpass
KEY-‐RTD-‐5-‐26
$104,000 $94,400 5 Rail Rehabilitation and Development (RT)
$520,000 RT_Key
Indiana Indiana County Rec, Prk, Open Space, Greenways Trails Plan
BRC-‐TAG-‐8-‐88
$60,000 $100,000 8 Comp. Rec., Park, & Open Space Plans (COMM)
$122,500 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 296 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Indiana Indiana County Conservation District
Waterworks Conservation Area
BRC-‐RCD-‐12-‐7
$100,000 $100,000 12 Development (RIV)
$411,900 RIVER_Key
Indiana Montgomery Township
Township Park KEY-‐SC-‐3-‐144
$19,800 $19,800 3 Small Communities/Small Projects (COMM)
$34,000 COMM_Key
Indiana Plumville Borough Plumville Area Playground
BRC-‐SC-‐10-‐94
$32,200 $30,000 10 Small Communities/Small Projects (COMM)
$44,350 COMM_Key
Indiana Saltsburg Borough North Park and West Penn Trail Bridge
BRC-‐PRD-‐9-‐8
$200,000 $200,000 9 Park Rehabilitation and Development (COMM)
$400,000 COMM_Key
Indiana Saltsburg Borough River's Edge Park -‐Phase II
KEY-‐SC-‐3-‐191
$19,700 $19,700 3 Small Communities/Small Projects (COMM)
$21,200 COMM_Key
Indiana Saltsburg Borough The Rivers Edge KEY-‐SC-‐2-‐135
$20,000 $20,000 2 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Indiana Smicksburg Borough Old Smicksburg Park KEY-‐SC-‐4-‐141
$15,500 $15,500 4 Small Communities/Small Projects (COMM)
$18,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 297 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Indiana West Wheatfield Township
Recreation Area KEY-‐SC-‐4-‐172
$18,910 $18,900 4 Small Communities/Small Projects (COMM)
$23,910 COMM_Key
Indiana Western Pennsylvania Conservancy
Garfield Tract Acquisition
BRC-‐LTA-‐13.3-‐534
$35,650 $12,000 13.3 Open Space Acquisition (LT)
$71,300 LT_Key
Indiana White Township Getty Heights Park BRC-‐PRD-‐9-‐233
$72,400 $72,000 9 Park Rehabilitation and Development (COMM)
$144,900 COMM_Key
Indiana White Township Indiana Ice Center Feasibility Study
BRC-‐TAG-‐11.5-‐37
$40,000 $40,000 11.5 Feasibility Studies (COMM)
$80,000 COMM_Key
Indiana White Township Kennedy-‐King Park -‐ Phase I
BRC-‐PRD-‐12-‐56
$72,800 $72,800 12 Park Rehabilitation and Development (COMM)
$145,600 COMM_Key
Indiana White Township Kennedy-King Park-- Phase 2 - Development
BRC-PRD-19-126
$85,097.50 $85,000.00 19 Park Rehabilitation and Development (COMM)
$170,195.00 COMM_Key
Indiana White Township Kennedy-King Park-- Phase 2 - Development
BRC-PRD-19-126
$85,097.50 $85,000.00 19 Park Rehabilitation and Development (COMM)
$170,195.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 298 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Indiana White Township Kennedy-King Park-- Phase 2 - Development
BRC-PRD-19-126
$85,097.50 $85,000.00 19 Park Rehabilitation and Development (COMM)
$170,195.00 COMM_Key
Indiana White Township Mack Pool BRC-‐PRD-‐13.3-‐447
$489,800 $675,000 13.3 Park Rehabilitation and Development (COMM)
$979,600 COMM_Key
Indiana White Township Peer-‐to-‐Peer KEY-‐TAG-‐3-‐2
$7,500 $75,000 3 Peer-‐to-‐Peer Tech. Assistance (COMM)
$8,250 COMM_Key
Indiana White Township Recreation Complex-‐Phase II
KEY-‐PRD-‐2-‐176
$199,200 $199,200 2 Park Rehabilitation and Development (COMM)
$398,400 COMM_Key
Indiana White Township White Township Recreation Complex
BRC-‐PRD-‐6-‐200
$93,300 $90,000 6 Park Rehabilitation and Development (COMM)
$186,600 COMM_Key
Indiana Young Township Township Park KEY-‐SC-‐5-‐232
$19,015 $19,000 5 Small Communities/Small Projects (COMM)
$24,140 COMM_Key
Indiana Young Township Young Township Park
BRC-‐SC-‐6-‐208
$18,700 $20,000 6 Small Communities/Small Projects (COMM)
$20,700 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 299 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Indiana, Westmoreland
Conemaugh Valley Conservancy, Inc.
R&P Trail BRC-‐RTD-‐7-‐1
$288,954 $320,000 7 Rail Rehabilitation and Development (RT)
$640,000 RT_Key
Indiana, Westmoreland
Conemaugh Valley Conservancy, Inc.
West Penn Trail -‐ Pedestrian Bridge
BRC-‐RTD-‐14-‐7
$250,000 $250,000 14 Rail Rehabilitation and Development (RT)
$500,000 RT_Key
Jefferson Brockway Borough Brockway Trail Connections
BRC-‐TAG-‐10-‐148
$8,000 $8,000 10 Trail Study (COMM)
$16,000 COMM_Key
Jefferson Brockway Borough Kids Kingdom Park KEY-‐SC-‐3-‐24 $20,000 $20,000 3 Small Communities/Small Projects (COMM)
$21,800 COMM_Key
Jefferson Brockway Borough Taylor Memorial Park
BRC-‐SC-‐7-‐26
$39,000 $39,000 7 Small Communities/Small Projects (COMM)
$58,000 COMM_Key
Jefferson Brockway Borough Taylor Memorial Park
KEY-‐SC-‐1-‐20 $20,000 $20,000 1 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Jefferson Brockway Borough Taylor Memorial Park -‐ Bandshell
BRC-‐PRD-‐11-‐12
$100,300 $100,300 11 Park Rehabilitation and Development (COMM)
$200,700 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 300 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Jefferson Brockway Borough Taylor Memorial Park Master Site Plan & Pool Feas. Study
BRC-‐TAG-‐13.3-‐460
$12,500 $12,500 13.3 Master Site Plans (COMM)
$25,000 COMM_Key
Jefferson Brockway Borough Taylor Memorial Park Pool
KEY-‐PRD-‐2-‐19
$32,000 $32,000 2 Park Rehabilitation and Development (COMM)
$64,000 COMM_Key
Jefferson Brockway Borough Taylor Memorial Park-‐ Development
BRC-‐PRD-‐16-‐124
$139,000 $139,000 16 Park Rehabilitation and Development (COMM)
$278,000 COMM_Key
Jefferson Brookville Borough Brookville Skatepark Study
BRC-‐TAG-‐12-‐226
$4,000 $4,000 12 Feasibility Studies (COMM)
$8,000 COMM_Key
Jefferson Brookville Borough Dr. Walter Dick Memorial Park
KEY-‐PRD-‐3-‐25
$26,200 $26,000 3 Park Rehabilitation and Development (COMM)
$52,400 COMM_Key
Jefferson Brookville Borough Walter Dick, Longview, & Memorial Parks
KEY-‐SC-‐2-‐20 $20,000 $20,000 2 Small Communities/Small Projects (COMM)
$39,000 COMM_Key
Jefferson Falls Creek Borough Falls Creek Park BRC-‐SC-‐10-‐78
$10,000 $20,000 10 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 301 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Jefferson Falls Creek Borough Falls Creek Park BRC-‐SC-‐9-‐74
$40,000 $30,000 9 Small Communities/Small Projects (COMM)
$63,700 COMM_Key
Jefferson Headwaters Charitable Trust
Line 651 Rail-‐TrailNow named "Wolf Creek Trail".
KEY-‐RTD-‐4-‐12
$5,000 $5,000 4 Rail Rehabilitation and Development (RT)
$10,000 RT_Key
Jefferson Jefferson County Circuit Rider BRC-‐TAG-‐6-‐8
$28,500 $60,275 6 Circuit Rider (COMM)
$75,800 COMM_Key
Jefferson Jefferson County Cloe Lake Recreational Development Study
BRC-‐TAG-‐8-‐94
$12,500 $12,500 8 Master Site Plans (COMM)
$25,000 COMM_Key
Jefferson Jefferson County Mahoning Creek Watershed Cons. Plan
KEY-‐RCP-‐95-‐13
$20,300 $20,300 1 Planning (RIV) $40,600 RIVER_Key
Jefferson Jefferson County Mahoning Shadow Trail
BRC-‐PRD-‐9-‐101
$65,000 $65,000 9 Park Rehabilitation and Development (COMM)
$387,000 COMM_Key
Jefferson Jefferson County Mahoning Shadow Trail
BRC-‐RTD-‐6-‐13
$25,000 $50,000 6 Rail Rehabilitation and Development (RT)
$50,000 RT_Key
Jefferson Jefferson County Mahoning Shadow Trail
KEY-‐ACQ-‐2-‐69
$47,500 $47,500 2 Acquisition (COMM)
$95,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 302 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Jefferson Jefferson County Peer-‐to-‐Peer KEY-‐TAG-‐4-‐3
$7,500 $7,500 4 Peer-‐to-‐Peer Tech. Assistance (COMM)
$8,250 COMM_Key
Jefferson McCalmont Township
Anita Park BRC-‐SC-‐7-‐123
$17,889 $20,000 7 Small Communities/Small Projects (COMM)
$26,289 COMM_Key
Jefferson Perry Township Fordham Trail Head BRC-‐SC-‐13.3-‐316
$20,000 $20,000 13.3 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Jefferson Punxsutawney Borough
Community Pool BRC-‐PRD-‐12-‐191
$50,000 $50,000 12 Park Rehabilitation and Development (COMM)
$100,000 COMM_Key
Jefferson Punxsutawney Borough
George C. Brown Pool Feasibility Study
BRC-‐TAG-‐9-‐172
$10,000 $10,000 9 Feasibility Studies (COMM)
$20,000 COMM_Key
Jefferson Punxsutawney Borough
Groundhog Zoo BRC-‐PRD-‐13.3-‐416
$13,800 $13,800 13.3 Park Rehabilitation and Development (COMM)
$27,600 COMM_Key
Jefferson Punxsutawney Borough
Peer-‐to-‐Peer BRC-‐TAG-‐9-‐4
$7,500 $7,500 9 Peer-‐to-‐Peer Tech. Assistance (COMM)
$8,250 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 303 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Jefferson Punxsutawney Borough
Punxsutawney Borough Recreational Area
BRC-‐PRD-‐8-‐159
$148,500 $148,000 8 Park Rehabilitation and Development (COMM)
$298,700 COMM_Key
Jefferson Punxsutawney Borough
Recreation Center Renovation
BRC-‐PRD-‐7-‐160
$233,000 $150,000 7 Park Rehabilitation and Development (COMM)
$466,000 COMM_Key
Jefferson Punxsutawney Borough
River Walk BRC-‐RCD-‐7-‐15
$35,000 $35,000 7 Development (RIV)
$70,000 RIVER_Key
Jefferson Reynoldsville Borough Community Park- Development
BRC-SC-19-49
$38,690.00 $40,000.00 19 Small Communities/Small Projects (COMM)
$57,380.00 COMM_Key
Jefferson Reynoldsville Borough Community Park- Development
BRC-SC-19-49
$38,690.00 $40,000.00 19 Small Communities/Small Projects (COMM)
$57,380.00 COMM_Key
Jefferson Reynoldsville Borough Community Park- Development
BRC-SC-19-49
$38,690.00 $40,000.00 19 Small Communities/Small Projects (COMM)
$57,380.00 COMM_Key
Jefferson Reynoldsville Borough
Reynoldsville Pool Rehabilitation
BRC-‐SC-‐12-‐290
$25,000 $25,000 12 Small Communities/Small Projects (COMM)
$30,000 COMM_Key
Jefferson Reynoldsville Borough
Reynoldsville Recreation Complex
KEY-‐SC-‐3-‐184
$20,000 $20,000 3 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 304 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Jefferson Sykesville Borough Highland Street Park BRC-‐SC-‐7-‐186
$19,086 $20,000 7 Small Communities/Small Projects (COMM)
$23,246 COMM_Key
Jefferson Sykesville Borough Stahl Community Park-‐ Development
BRC-‐SC-‐16-‐48
$40,000 $40,000 16 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Jefferson Sykesville Borough Stahl Park BRC-‐SC-‐10-‐100
$20,000 $24,000 10 Small Communities/Small Projects (COMM)
$28,200 COMM_Key
Jefferson Washington Township
Wolf Creek Park Development
BRC-‐SC-‐11-‐163
$20,000 $20,000 11 Small Communities/Small Projects (COMM)
$33,600 COMM_Key
Jefferson Young Township Adrian Park KEY-‐SC-‐4-‐180
$20,000 $20,000 4 Small Communities/Small Projects (COMM)
$22,200 COMM_Key
Juniata Fayette Township Lost Creek Community Park
BRC-‐PRD-‐14-‐140
$200,400 $150,000 14 Park Rehabilitation and Development (COMM)
$400,800 COMM_Key
Juniata Fayette Township Lost Creek Community Park Plan
BRC-‐TAG-‐11.5-‐22
$15,000 $15,000 11.5 Master Site Plans (COMM)
$30,000 COMM_Key
Juniata Fayette Township Sieber Property Acquisition
BRC-‐ACQ-‐13.6-‐580
$299,260 $299,000 13.6 Acquisition (COMM)
$611,260 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 305 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Juniata Fermanagh Township
Recreation Park Acquisition
BRC-‐ACQ-‐11-‐176
$51,600 $50,000 11 Acquisition (COMM)
$103,200 COMM_Key
Juniata Juniata County Juniata/Mifflin Greenway & Rural Recreation Plan
BRC-‐TAG-‐12-‐239
$95,500 $75,000 12 Greenway Plans (COMM)
$191,000 COMM_Key
Juniata Mifflintown Borough Myers Park BRC-‐SC-‐6-‐112
$20,000 $20,000 6 Small Communities/Small Projects (COMM)
$24,731 COMM_Key
Juniata Walker Township Park Acquisition BRC-‐ACQ-‐8-‐206
$168,000 $165,000 8 Acquisition (COMM)
$336,000 COMM_Key
Juniata Walker Township Walker Township Park
BRC-‐PRD-‐9-‐218
$139,300 $130,000 9 Park Rehabilitation and Development (COMM)
$278,600 COMM_Key
Lackawanna Archbald Borough Archbald Regional Park
BRC-‐PRD-‐7-‐12
$250,000 $250,000 7 Park Rehabilitation and Development (COMM)
$500,000 COMM_Key
Lackawanna Archbald Borough Laurel Street Park KEY-‐PRD-‐2-‐3
$21,000 $21,000 2 Park Rehabilitation and Development (COMM)
$42,000 COMM_Key
Lackawanna Blakely Borough Sen. Robert Mellow Recreation Complex
KEY-‐PRD-‐4-‐16
$160,000 $100,000 4 Park Rehabilitation and Development (COMM)
$320,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 306 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lackawanna Blakely Borough Swansee Recreation Area Expansion
KEY-‐ACQ-‐2-‐14
$42,000 $42,000 2 Acquisition (COMM)
$88,000 COMM_Key
Lackawanna Clarks Green Borough
Abington Area Community Park-‐Development
BRC-‐PRD-‐15-‐55
$61,250 $61,000 15 Park Rehabilitation and Development (COMM)
$122,500 COMM_Key
Lackawanna Clarks Summit Borough
Abington Area Community Park Master Site Dev. Plan
BRC-‐TAG-‐11-‐197
$40,000 $40,000 11 Master Site Plans (COMM)
$80,000 COMM_Key
Lackawanna Clifton Township Clifton Acres Acquisition
BRC-‐ACQ-‐17-‐89
$78,697 $77,600 17 Acquisition (COMM)
$161,394 COMM_Key
Lackawanna Countryside Conservancy
Ackerly Creek Greenway Assessment
KEY-‐RCI-‐5-‐9 $32,700 $33,000 5 Implementation (RIV)
$82,150 RIVER_Key
Lackawanna Countryside Conservancy
Countryside Conservancy Rail Trail Feas. Plan
BRC-‐RTP-‐8-‐4
$20,000 $20,000 8 Feasibility Studies (RT)
$40,000 RT_Key
Lackawanna Countryside Conservancy
Tunkhannock Creek Watershed Greenway
BRC-‐LTA-‐7-‐5
$250,000 $250,000 7 Open Space Acquisition (LT)
$1,267,600 LT_Key
Lackawanna Covington Township Municipal Park KEY-‐ACQ-‐5-‐40
$39,800 $34,500 5 Acquisition (COMM)
$79,667 COMM_Key
Lackawanna Dalton Borough Dalton Streamside Master Plan
BRC-‐TAG-‐6-‐48
$13,250 $13,200 6 Master Site Plans (COMM)
$26,500 COMM_Key
Lackawanna Dalton Borough Dalton Streamside Park
BRC-‐SC-‐7-‐47
$40,000 $40,000 7 Small Communities/Small Projects (COMM)
$60,058 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 307 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lackawanna Dalton Borough Streamside and Platt Parks-‐ Rehab.& Development
BRC-‐SC-‐15-‐77
$39,000 $39,000 15 Small Communities/Small Projects (COMM)
$58,000 COMM_Key
Lackawanna Jefferson Township Ritter Land Acquisition BRC-ACQ-19-10
$145,010.00 $141,200.00 19 Acquisition (COMM)
$290,020.00 COMM_Key
Lackawanna Jefferson Township Ritter Land Acquisition BRC-ACQ-19-10
$145,010.00 $141,200.00 19 Acquisition (COMM)
$290,020.00 COMM_Key
Lackawanna Jefferson Township Ritter Land Acquisition BRC-ACQ-19-10
$145,010.00 $141,200.00 19 Acquisition (COMM)
$290,020.00 COMM_Key
Lackawanna Jefferson Township Township Park Master Site Plan
BRC-TAG-19-133
$30,000.00 $30,000.00 19 Master Site Plans (COMM)
$60,000.00 COMM_Key
Lackawanna Jefferson Township Township Park Master Site Plan
BRC-TAG-19-133
$30,000.00 $30,000.00 19 Master Site Plans (COMM)
$60,000.00 COMM_Key
Lackawanna Jefferson Township Township Park Master Site Plan
BRC-TAG-19-133
$30,000.00 $30,000.00 19 Master Site Plans (COMM)
$60,000.00 COMM_Key
Lackawanna Jessup Borough Sports Complex KEY-‐PRD-‐4-‐73
$35,000 $35,000 4 Park Rehabilitation and Development (COMM)
$75,000 COMM_Key
Lackawanna Lackawanna County Aylesworth Park -‐ Development
BRC-‐PRD-‐13-‐379
$100,000 $100,000 13 Park Rehabilitation and Development (COMM)
$225,000 COMM_Key
Lackawanna Lackawanna County Aylesworth Park Master Site Development Plan
BRC-‐TAG-‐13-‐189
$20,000 $20,000 13 Master Site Plans (COMM)
$40,000 COMM_Key
Lackawanna Lackawanna County Covington Park Master Site Plan
KEY-‐TAG-‐4-‐76
$30,000 $30,000 4 Master Site Plans (COMM)
$60,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 308 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lackawanna Lackawanna County Merli-‐Sarnoski Park Master Site Plan
BRC-‐TAG-‐11-‐215
$20,000 $20,000 11 Master Site Plans (COMM)
$40,000 COMM_Key
Lackawanna Lackawanna County Two Sites KEY-‐PRD-‐4-‐77
$150,000 $100,000 4 Park Rehabilitation and Development (COMM)
$420,000 COMM_Key
Lackawanna Lackawanna Heritage Valley Authority
Lackawanna River Heritage Trail
KEY-‐PRD-‐3-‐102
$200,000 $200,000 3 Park Rehabilitation and Development (COMM)
$755,000 COMM_Key
Lackawanna Lackawanna Heritage Valley Authority
Lackawanna River Heritage Trail -‐ Carbondale Riverwalk -‐ Development
BRC-‐PRD-‐18-‐78
$905,346 $392,500 18 Park Rehabilitation and Development (COMM)
$1,810,693 COMM_Key
Lackawanna Lackawanna Heritage Valley Authority
Lackawanna River Heritage Trail – Carbondale & Fell Acquisitions
BRC-‐ACQ-‐18-‐6
$40,000 $40,000 18 Acquisition (COMM)
$80,000 COMM_Key
Lackawanna Lackawanna Heritage Valley Authority
Lackawanna River Heritage Trail – Fell Township Section – Development
BRC-PRD-19-88
$798,778.00 $500,000.00 19 Park Rehabilitation and Development (COMM)
$998,472.50 COMM_Key
Lackawanna Lackawanna Heritage Valley Authority
Lackawanna River Heritage Trail – Fell Township Section – Development
BRC-PRD-19-88
$798,778.00 $500,000.00 19 Park Rehabilitation and Development (COMM)
$998,472.50 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 309 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lackawanna Lackawanna Heritage Valley Authority
Lackawanna River Heritage Trail – Fell Township Section – Development
BRC-PRD-19-88
$798,778.00 $500,000.00 19 Park Rehabilitation and Development (COMM)
$998,472.50 COMM_Key
Lackawanna Lackawanna Heritage Valley Authority
Lackawanna River Heritage Trail – Taylor & Mayfield Acquisitions
BRC-RTA-19-160
$90,290.00 $90,200.00 19 Acquisition (RT)
$180,580.00 COMM_Key
Lackawanna Lackawanna Heritage Valley Authority
Lackawanna River Heritage Trail – Taylor & Mayfield Acquisitions
BRC-RTA-19-160
$90,290.00 $90,200.00 19 Acquisition (RT)
$180,580.00 COMM_Key
Lackawanna Lackawanna Heritage Valley Authority
Lackawanna River Heritage Trail – Taylor & Mayfield Acquisitions
BRC-RTA-19-160
$90,290.00 $90,200.00 19 Acquisition (RT)
$180,580.00 COMM_Key
Lackawanna Lackawanna Heritage Valley Authority
Lackawanna River Heritage Trail – Taylor & Mayfield Acquisitions
BRC-RTA-19-160
$90,290.00 $90,200.00 19 Acquisition (RT)
$180,580.00 COMM_Key
Lackawanna Lackawanna Heritage Valley Authority
Lackawanna River Heritage Trail Design Only -‐ Planning
BRC-‐TAG-‐17-‐10
$75,000 $75,000 17 Trail Study (COMM)
$150,000 COMM_Key
Lackawanna Lackawanna Heritage Valley Authority
Peer-‐to-‐Peer KEY-‐TAG-‐1-‐68
$7,500 $7,500 1 Peer-‐to-‐Peer Tech. Assistance (COMM)
$8,250 COMM_Key
Lackawanna Lackawanna River Corridor Association
Lackawanna River Corridor Plan
KEY-‐RCP-‐5-‐10
$24,000 $24,000 5 Planning (RIV) $48,300 RIVER_Key
Lackawanna Lackawanna Valley Conservancy
Providence Reach Acquisition
BRC-‐RTA-‐12-‐2
$50,000 $45,000 12 Acquisition (RT) $114,100 RT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 310 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lackawanna Mayfield Borough Community Park BRC-‐SC-‐14-‐97
$25,000 $25,000 14 Small Communities/Small Projects (COMM)
$30,000 COMM_Key
Lackawanna Newton Township Newton Recreation Center
KEY-‐PRD-‐5-‐147
$33,000 $33,000 5 Park Rehabilitation and Development (COMM)
$66,000 COMM_Key
Lackawanna Newton Township Newton Recreation Center Park
BRC-‐PRD-‐8-‐133
$92,100 $90,000 8 Park Rehabilitation and Development (COMM)
$184,300 COMM_Key
Lackawanna Olyphant Borough Fern Hill Park BRC-‐PRD-‐6-‐134
$100,000 $100,000 6 Park Rehabilitation and Development (COMM)
$220,801 COMM_Key
Lackawanna Olyphant Borough Philip Condella Athletic Complex
BRC-‐PRD-‐13.3-‐409
$100,000 $100,000 13.3 Park Rehabilitation and Development (COMM)
$201,700 COMM_Key
Lackawanna Olyphant Borough Phillip Condella Athletic Complex -‐ Development
BRC-‐PRD-‐17-‐145
$100,000 $100,000 17 Park Rehabilitation and Development (COMM)
$220,573 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 311 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lackawanna Olyphant Borough Recreation Center-‐Phillip Condella Athl. Complex
BRC-‐PRD-‐10-‐131
$200,000 $150,000 10 Park Rehabilitation and Development (COMM)
$1,472,400 COMM_Key
Lackawanna Ransom Township Recreational Area Master Site Plan
BRC-‐TAG-‐16-‐71
$42,500 $42,500 16 Master Site Plans (COMM)
$85,000 COMM_Key
Lackawanna Scott Township Justus Field KEY-‐PRD-‐5-‐178
$21,707 $21,700 5 Park Rehabilitation and Development (COMM)
$43,413 COMM_Key
Lackawanna Scranton City 500 Lackawanna Avenue Park Plaza
BRC-‐PRD-‐14-‐372
$1,000,000 $500,000 14 Park Rehabilitation and Development (COMM)
$3,000,000 COMM_Key
Lackawanna Scranton City Comp. Recreation, Park & Open Space Plan
KEY-‐TAG-‐5-‐179
$40,000 $40,000 5 Comp. Rec., Park, & Open Space Plans (COMM)
$80,000 COMM_Key
Lackawanna South Abington Township
South Abington Community Park
BRC-‐PRD-‐13-‐144
$29,800 $29,800 13 Park Rehabilitation and Development (COMM)
$59,600 COMM_Key
Lackawanna The Nature Conservancy
Moosic Mountain -‐ SLIBCO
BRC-‐LTA-‐6-‐21
$1,133,000 $1,100,000 6 Critical Habitat Acquisition (LT)
$2,266,000 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 312 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lackawanna The Nature Conservancy
Moosic Mountain Barrens Acquisition -‐ (Phase 1)
BRC-‐LTA-‐14-‐46
$2,218,800 $811,000 14 Critical Habitat Acquisition (LT)
$4,437,500 LT_Key
Lackawanna Thornhurst Township
Thornhurst Township Park Acquisition
BRC-‐ACQ-‐11.5-‐14
$31,400 $31,400 11.5 Acquisition (COMM)
$62,800 COMM_Key
Lackawanna Thornhurst Township
Thornhurst Township Park Master Site Plan
BRC-‐TAG-‐14-‐246
$17,500 $17,500 14 Master Site Plans (COMM)
$35,000 COMM_Key
Lackawanna Throop Borough Washington Street Park
KEY-‐PRD-‐3-‐218
$100,000 $100,000 3 Park Rehabilitation and Development (COMM)
$216,000 COMM_Key
Lackawanna Vandling Borough Borough Park KEY-‐SC-‐4-‐158
$20,000 $20,000 4 Small Communities/Small Projects (COMM)
$24,000 COMM_Key
Lackawanna Waverly Township Recreation Park-‐Development
BRC-‐SC-‐15-‐74
$40,000 $40,000 15 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Lackawanna, Luzerne
Luzerne County Luzerne/Lackawanna Bi-‐County Comp. Plan
BRC-‐TAG-‐13-‐192
$15,000 $15,000 13 Comp. Rec., Park, & Open Space Plans (COMM)
$30,000 COMM_Key
Lackawanna, Luzerne
The Conservation Fund
Theta Lands Acquisition (Watres Tract)
BRC-‐LTA-‐10-‐2
$1,919,000 $1,026,000 10 Open Space Acquisition (LT)
$3,838,000 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 313 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lackawanna, Luzerne
Wildlands Conservancy, Inc.
Blue Ridge Acquisition
BRC-‐LTA-‐13-‐27
$2,575,000 $1,500,000 13 Critical Habitat Acquisition (LT)
$5,150,000 LT_Key
Lackawanna, Wayne
Wildlands Conservancy, Inc.
Panther Bluffs Conservation Easement
BRC-‐LTA-‐7-‐25
$500,000 $500,000 7 Critical Habitat Acquisition (LT)
$1,401,000 LT_Key
Lancaster Akron Borough Colonial Park Acquisition
BRC-‐ACQ-‐11-‐168
$95,000 $95,000 11 Acquisition (COMM)
$190,000 COMM_Key
Lancaster Akron Borough Northern Lancaster Reading & Columbia Rail-‐Trail
BRC-‐RTP-‐9-‐1
$40,000 $40,000 9 Feasibility Studies (RT)
$80,000 RT_Key
Lancaster Akron Borough Warwick to Ephrata Rail Trail -‐ Akron East
BRC-‐PRD-‐16-‐117
$188,400 $188,400 16 Park Rehabilitation and Development (COMM)
$376,800 COMM_Key
Lancaster Akron Borough Warwick to Ephrata Rail-‐Trail -‐ Akron West -‐ Development
BRC-‐RTD-‐18-‐168
$139,202 $139,200 18 Rail Rehabilitation and Development (RT)
$278,404 COMM_Key
Lancaster Caernarvon Township
Poole Forge Park Acquisition
BRC-‐ACQ-‐11-‐170
$182,300 $110,000 11 Acquisition (COMM)
$364,500 COMM_Key
Lancaster Clay Township Snyder Park- Development
BRC-PRD-19-69
$150,000.00 $150,000.00 19 Park Rehabilitation and Development (COMM)
$304,000.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 314 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lancaster Clay Township Snyder Park- Development
BRC-PRD-19-69
$150,000.00 $150,000.00 19 Park Rehabilitation and Development (COMM)
$304,000.00 COMM_Key
Lancaster Clay Township Snyder Park- Development
BRC-PRD-19-69
$150,000.00 $150,000.00 19 Park Rehabilitation and Development (COMM)
$304,000.00 COMM_Key
Lancaster Clay Township Synder Park Expansion
BRC-‐ACQ-‐10-‐176
$166,100 $110,000 10 Acquisition (COMM)
$332,300 COMM_Key
Lancaster Columbia Borough Feasibility Study KEY-‐RTP-‐3-‐5 $13,300 $13,300 3 Feasibility Studies (RT)
$26,600 RT_Key
Lancaster Columbia Borough Makle Park Rehabilitation Project
BRC-‐PRD-‐10-‐112
$109,000 $109,000 10 Park Rehabilitation and Development (COMM)
$217,900 COMM_Key
Lancaster Columbia Borough Riverfront and Rotary Parks -‐ Development
BRC-‐PRD-‐17-‐113
$640,700 $750,000 17 Park Rehabilitation and Development (COMM)
$1,281,400 COMM_Key
Lancaster Columbia Borough Riverfront Park-‐ Phase I
BRC-‐PRD-‐13-‐98
$425,000 $650,000 13 Park Rehabilitation and Development (COMM)
$2,060,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 315 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lancaster Columbia Borough TreeVitalize Columbia
BRC-‐TV-‐14-‐1
$15,000 $15,000 14 Park Rehabilitation and Development (COMM)
$30,000 COMM_Key
Lancaster Conestoga Township Mini Comp. Rec. Park & Open Space Plan
BRC-‐TAG-‐8-‐51
$12,500 $12,500 8 Comp. Rec., Park, & Open Space Plans (COMM)
$25,000 COMM_Key
Lancaster Conestoga Township Swimming Pool KEY-‐PRD-‐1-‐33
$123,722 $120,000 1 Park Rehabilitation and Development (COMM)
$247,445 COMM_Key
Lancaster Conoy Township Burkett Riverfront Property Acquisition
BRC-‐RCA-‐13-‐507
$55,500 $55,000 13 Acquisition (RIV)
$110,900 RIVER_Key
Lancaster Conoy Township Northwest Lancaster County River Trail -‐ Bainbridge Riverfront -‐ Development
BRC-‐PRD-‐18-‐60
$62,480 $162,400 18 Park Rehabilitation and Development (COMM)
$124,960 COMM_Key
Lancaster Conoy Township NW Lancaster County River Trail
BRC-‐TAG-‐7-‐44
$25,000 $25,000 7 Greenway Plans (COMM)
$50,000 COMM_Key
Lancaster Denver Borough Bon View Estates Linear Park
BRC-‐PRD-‐9-‐61
$56,868 $16,868 9 Park Rehabilitation and Development (COMM)
$113,736 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 316 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lancaster Denver Borough Denver Memorial Park
BRC-‐SC-‐7-‐49
$40,000 $40,000 7 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Lancaster Denver Borough Getz Land Acquisition
BRC-‐ACQ-‐15-‐43
$68,000 $68,000 15 Acquisition (COMM)
$136,000 COMM_Key
Lancaster Denver Borough Memorial Park Addition
KEY-‐ACQ-‐5-‐44
$30,600 $28,000 5 Acquisition (COMM)
$61,200 COMM_Key
Lancaster Denver Borough Memorial Park Annex
BRC-‐PRD-‐14-‐313
$72,000 $72,000 14 Park Rehabilitation and Development (COMM)
$144,000 COMM_Key
Lancaster Denver Borough North 4th Street Park- Development
BRC-SC-19-37
$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)
$60,000.00 COMM_Key
Lancaster Denver Borough North 4th Street Park- Development
BRC-SC-19-37
$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)
$60,000.00 COMM_Key
Lancaster Denver Borough North 4th Street Park- Development
BRC-SC-19-37
$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)
$60,000.00 COMM_Key
Lancaster Denver Borough Open Space Plan BRC-‐TAG-‐6-‐51
$10,000 $10,000 6 Comp. Rec., Park, & Open Space Plans (COMM)
$20,000 COMM_Key
Lancaster Donegal Chapter of Trout Unlimited
Lititz Run Restoration
BRC-‐RCD-‐6-‐15
$25,000 $25,000 6 Development (RIV)
$50,000 RIVER_Key
Keystone Fund Projects by County (1994-‐2013)
Page 317 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lancaster Donegal Chapter of Trout Unlimited
Lititz Run Watershed Plan
KEY-‐RCP-‐96-‐10
$25,000 $25,000 3 Planning (RIV) $50,000 RIVER_Key
Lancaster East Donegal Township
Bridle Park-‐ Phase I BRC-‐PRD-‐13.3-‐352
$118,000 $117,000 13.3 Park Rehabilitation and Development (COMM)
$235,000 COMM_Key
Lancaster East Donegal Township
Joint Donegal Area Recreation Director Study
BRC-‐TAG-‐7-‐56
$7,500 $7,500 7 Peer-‐to-‐Peer Tech. Assistance (COMM)
$8,250 COMM_Key
Lancaster East Donegal Township
Kreider Property KEY-‐ACQ-‐4-‐47
$265,000 $100,000 4 Acquisition (COMM)
$530,000 COMM_Key
Lancaster East Donegal Township
Kreider Tract BRC-‐TAG-‐9-‐67
$25,000 $25,000 9 Master Site Plans (COMM)
$50,000 COMM_Key
Lancaster East Donegal Township
Northwest Lancaster County River Trail
BRC-‐PRD-‐13-‐102
$754,800 $300,000 13 Park Rehabilitation and Development (COMM)
$1,147,200 COMM_Key
Lancaster East Donegal Township
Riverfront Park Environ. Ed. Ctr. FS & Marietta Trail Study
BRC-‐TAG-‐14-‐200
$28,000 $28,000 14 Feasibility Studies (COMM)
$56,000 COMM_Key
Lancaster East Donegal Township
Riverfront Park-‐ Development
BRC-‐PRD-‐16-‐128
$90,000 $90,000 16 Park Rehabilitation and Development (COMM)
$180,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 318 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lancaster East Donegal Township
Susquehanna River Park
KEY-‐ACQ-‐1-‐42
$25,413 $25,000 1 Acquisition (COMM)
$50,826 COMM_Key
Lancaster East Donegal Township
Swimming Pool Feasibility Study
KEY-‐TAG-‐4-‐46
$17,150 $17,100 4 Feasibility Studies (COMM)
$34,300 COMM_Key
Lancaster East Donegal Township
The Orchards/Melhorn Park
BRC-‐PRD-‐6-‐56
$23,000 $23,000 6 Park Rehabilitation and Development (COMM)
$46,286 COMM_Key
Lancaster East Earl Township Elanco Region Comp. Rec, Park & Open Space Plan
BRC-‐TAG-‐8-‐59
$30,000 $30,000 8 Comp. Rec., Park, & Open Space Plans (COMM)
$60,000 COMM_Key
Lancaster East Lampeter Township
Flory Park -‐ Phase I KEY-‐PRD-‐3-‐53
$118,500 $100,000 3 Park Rehabilitation and Development (COMM)
$268,500 COMM_Key
Lancaster Elizabeth Township Elizabeth Township Park -‐ Phase I
BRC-‐PRD-‐13-‐357
$200,000 $200,000 13 Park Rehabilitation and Development (COMM)
$556,100 COMM_Key
Lancaster Elizabeth Township Miller Property Acquisition
BRC-‐ACQ-‐11-‐175
$126,500 $126,000 11 Acquisition (COMM)
$252,900 COMM_Key
Lancaster Elizabethtown Borough
Elizabethtown Community Park-‐Development
BRC-‐PRD-‐18-‐69
$249,646 $250,000 18 Park Rehabilitation and Development (COMM)
$499,292 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 319 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lancaster Elizabethtown Borough
Willowood Park KEY-‐ACQ-‐3-‐58
$57,500 $50,000 3 Acquisition (COMM)
$115,000 COMM_Key
Lancaster Elizabethtown Borough
Willowood Park Master Plan
KEY-‐TAG-‐4-‐54
$11,400 $11,400 4 Master Site Plans (COMM)
$22,800 COMM_Key
Lancaster Ephrata Township Community Park -‐ Phase I
BRC-‐PRD-‐10-‐181
$67,525 $67,000 10 Park Rehabilitation and Development (COMM)
$135,050 COMM_Key
Lancaster Ephrata Township Sand Mine Comm. Park Acq.
BRC-‐ACQ-‐8-‐64
$265,000 $200,000 8 Acquisition (COMM)
$530,000 COMM_Key
Lancaster Lampeter-‐Strasburg Recreation Commission
Circuit Rider -‐ Year 2 KEY-‐TAG-‐3-‐104
$27,500 $27,500 3 Circuit Rider (COMM)
$36,700 COMM_Key
Lancaster Lampeter-‐Strasburg Recreation Commission
Circuit Rider -‐ Year 3 KEY-‐TAG-‐4-‐78
$18,900 $18,900 4 Circuit Rider (COMM)
$37,800 COMM_Key
Lancaster Lampeter-‐Strasburg Recreation Commission
Circuit Rider (Year 1) KEY-‐TAG-‐2-‐73
$35,000 $35,000 2 Circuit Rider (COMM)
$35,000 COMM_Key
Lancaster Lampeter-‐Strasburg Recreation Commission
Lampeter-‐Strasburg Region Recreation Center
BRC-‐TAG-‐7-‐97
$17,500 $17,500 7 Feasibility Studies (COMM)
$35,000 COMM_Key
Lancaster Lancaster City 6th Ward Park BRC-‐PRD-‐14-‐147
$500,000 $350,000 14 Park Rehabilitation and Development (COMM)
$1,862,300 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 320 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lancaster Lancaster City Comprehensive Recreation & Park Plan
BRC-‐TAG-‐12-‐242
$110,000 $100,000 12 Comp. Rec., Park, & Open Space Plans (COMM)
$220,000 COMM_Key
Lancaster Lancaster City Musser Park BRC-‐PRD-‐8-‐101
$174,000 $250,000 8 Park Rehabilitation and Development (COMM)
$347,700 COMM_Key
Lancaster Lancaster City Northeast Greenway Trail Project
BRC-TAG-19-134
$51,250.00 $25,000.00 19 Feasibility Studies (COMM)
$102,500.00 COMM_Key
Lancaster Lancaster City Northeast Greenway Trail Project
BRC-TAG-19-134
$51,250.00 $25,000.00 19 Feasibility Studies (COMM)
$102,500.00 COMM_Key
Lancaster Lancaster City Northeast Greenway Trail Project
BRC-TAG-19-134
$51,250.00 $25,000.00 19 Feasibility Studies (COMM)
$102,500.00 COMM_Key
Lancaster Lancaster City TreeVitalize Lancaster
BRC-‐TV-‐14-‐3
$185,200 $25,000 14 Park Rehabilitation and Development (COMM)
$370,400 COMM_Key
Lancaster Lancaster County Buchmiller, Central and Peninsula Park Plans
BRC-‐TAG-‐10-‐156
$82,000 $75,000 10 Master Site Plans (COMM)
$204,000 COMM_Key
Lancaster Lancaster County Central Park KEY-‐PRD-‐4-‐79
$166,000 $100,000 4 Park Rehabilitation and Development (COMM)
$332,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 321 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lancaster Lancaster County Conestoga Greenway Trail
BRC-‐PRD-‐13-‐112
$235,200 $200,000 13 Park Rehabilitation and Development (COMM)
$470,500 COMM_Key
Lancaster Lancaster County Conewago Trail -‐ Phase 2 Development
BRC-‐RTD-‐12-‐10
$166,800 $166,800 12 Rail Rehabilitation and Development (RT)
$333,600 RT_Key
Lancaster Lancaster County Lancaster County Skate Park
KEY-‐PRD-‐5-‐106
$136,857 $136,000 5 Park Rehabilitation and Development (COMM)
$273,715 COMM_Key
Lancaster Lancaster County Natural & Historical Resources Inventory
BRC-‐TAG-‐6-‐91
$23,300 $23,300 6 Natural Areas Inventories (COMM)
$46,600 COMM_Key
Lancaster Lancaster County Octoraro Regional Park
KEY-‐ACQ-‐3-‐105
$62,000 $62,000 3 Acquisition (COMM)
$124,000 COMM_Key
Lancaster Lancaster County Trailheads, Five County Parks
KEY-‐PRD-‐3-‐106
$104,600 $75,000 3 Park Rehabilitation and Development (COMM)
$209,200 COMM_Key
Lancaster Lancaster County Conservancy
Buchter Property Acquisition
BRC-‐LTA-‐14-‐33
$205,500 $167,000 14 Critical Habitat Acquisition (LT)
$411,000 LT_Key
Lancaster Lancaster County Conservancy
Camp Snyder Acquisition
BRC-‐LTA-‐17-‐55
$686,530 $640,800 17 Open Space Acquisition (LT)
$1,372,660 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 322 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lancaster Lancaster County Conservancy
Edwards Property Acquisition
BRC-‐LTA-‐13.3-‐519
$163,600 $163,000 13.3 Open Space Acquisition (LT)
$327,100 LT_Key
Lancaster Lancaster County Conservancy
Elizabethtown Area Park Authority Property
BRC-‐LTA-‐13.3-‐520
$661,500 $661,000 13.3 Open Space Acquisition (LT)
$1,323,000 LT_Key
Lancaster Lancaster County Conservancy
Fishing Creek KEY-‐CHP-‐2-‐6
$5,000 $5,000 5 Coldwater Heritage Partnership
$5,000 RIVER_Key
Lancaster Lancaster County Conservancy
Fishing Creek Preserve
KEY-‐LTA-‐3-‐7 $34,838 $25,000 3 Critical Habitat Acquisition (LT)
$70,000 LT_Key
Lancaster Lancaster County Conservancy
Fishing Creek Watershed Plan
BRC-‐RCP-‐9-‐10
$96,800 $60,000 9 Planning (RIV) $527,500 RIVER_Key
Lancaster Lancaster County Conservancy
Guion Land Acquisition
BRC-‐LTA-‐9-‐11
$846,200 $700,000 9 Open Space Acquisition (LT)
$1,692,400 LT_Key
Lancaster Lancaster County Conservancy
Hauer-‐Trout Run Nature Preserve
KEY-‐LTA-‐4-‐10
$100,000 $100,000 4 Critical Habitat Acquisition (LT)
$200,000 LT_Key
Lancaster Lancaster County Conservancy
Houk Property Acquisition
BRC-‐LTA-‐12.5-‐7
$66,000 $66,000 12.5 Open Space Acquisition (LT)
$120,000 LT_Key
Lancaster Lancaster County Conservancy
Keener Property Acquisition
BRC-‐LTA-‐11-‐16
$107,600 $107,000 11 Open Space Acquisition (LT)
$215,200 LT_Key
Lancaster Lancaster County Conservancy
McKeever Property Acquisition/Steinman Run
BRC-‐LTA-‐13.6-‐612
$37,400 $65,000 13.6 Open Space Acquisition (LT)
$174,800 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 323 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lancaster Lancaster County Conservancy
McKinney Property Acquisition
BRC-‐LTA-‐12.5-‐8
$160,000 $160,000 12.5 Open Space Acquisition (LT)
$320,000 LT_Key
Lancaster Lancaster County Conservancy
New Holland Water Authority Acquisition (Phase 3)
BRC-‐LTA-‐15-‐120
$1,040,650 $1,040,000 15 Open Space Acquisition (LT)
$2,081,300 LT_Key
Lancaster Lancaster County Conservancy
New Holland Water Authority Acquisition Phase 2
BRC-‐LTA-‐12-‐23
$1,784,000 $1,784,000 12 Open Space Acquisition (LT)
$3,568,000 LT_Key
Lancaster Lancaster County Conservancy
Olcott Acquisition BRC-‐LTA-‐9-‐12
$35,000 $35,000 9 Open Space Acquisition (LT)
$76,900 LT_Key
Lancaster Lancaster County Conservancy
Seth Land Acquisition -‐ (Welsh Mtn. Nature Preserve)
BRC-‐LTA-‐18-‐11
$57,365 $57,300 18 Open Space Acquisition (LT)
$114,730 LT_Key
Lancaster Lancaster County Conservancy
Shoemaker Acquisition
BRC-‐LTA-‐12.5-‐9
$36,500 $36,000 12.5 Open Space Acquisition (LT)
$73,000 LT_Key
Lancaster Lancaster County Conservancy
Steinman Run Nature Preserve
KEY-‐LTA-‐5-‐6 $235,575 $225,000 5 Critical Habitat Acquisition (LT)
$471,150 LT_Key
Lancaster Lancaster County Conservancy
Sweigart Acquisition BRC-‐LTA-‐9-‐13
$37,000 $37,000 9 Open Space Acquisition (LT)
$74,400 LT_Key
Lancaster Lancaster County Conservancy
Swift Land Acquisition -‐ (Welsh Mtn. Nature Preserve)
BRC-‐LTA-‐18-‐12
$56,299 $56,300 18 Open Space Acquisition (LT)
$112,597 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 324 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lancaster Lancaster County Conservancy
Tucquan Glen Nature Preserve
KEY-‐LTA-‐5-‐7 $41,175 $40,000 5 Critical Habitat Acquisition (LT)
$87,350 LT_Key
Lancaster Lancaster County Conservancy
Tucquan Glen/Pyfer Nature Preserve
KEY-‐LTA-‐1-‐5 $90,000 $72,000 1 Critical Habitat Acquisition (LT)
$200,000 LT_Key
Lancaster Lancaster County Conservancy
Tucquan Glen/Pyfer Nature Preserve
KEY-‐LTA-‐2-‐5 $13,500 $13,500 2 Open Space Acquisition (LT)
$27,000 LT_Key
Lancaster Lancaster County Conservancy
Wilhelm Property Acquisition
BRC-‐LTA-‐13.3-‐521
$332,000 $331,000 13.3 Open Space Acquisition (LT)
$664,000 LT_Key
Lancaster Lancaster County Conservation District
TreeVitalize Metros BRC-‐TV-‐16-‐244
$100,000 $100,000 16 Park Rehabilitation and Development (COMM)
$200,000 COMM_Key
Lancaster Lancaster Inter-‐Municipal Committee
Conestoga River Management Study
KEY-‐TAG-‐1-‐69
$25,000 $25,000 1 Greenway Plans (COMM)
$50,000 COMM_Key
Lancaster Lancaster School District
Buchanan-‐Carter/MacRae-‐Washington-‐Wickersham Playgrounds
BRC-‐PRD-‐12-‐165
$200,000 $200,000 12 Park Rehabilitation and Development (COMM)
$400,000 COMM_Key
Lancaster Lancaster Township Maple Grove Park BRC-‐PRD-‐7-‐98
$42,837 $35,000 7 Park Rehabilitation and Development (COMM)
$85,675 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 325 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lancaster Leacock Township Community Park KEY-‐ACQ-‐3-‐110
$125,000 $100,000 3 Acquisition (COMM)
$250,000 COMM_Key
Lancaster Lititz Borough Greenway & Trail Plan
BRC-‐TAG-‐7-‐102
$20,000 $20,000 7 Greenway Plans (COMM)
$40,000 COMM_Key
Lancaster Manheim Borough Manheim Central Reg. Circuit Rider -‐ Yr. 1
KEY-‐TAG-‐4-‐90
$35,000 $35,000 4 Circuit Rider (COMM)
$35,000 COMM_Key
Lancaster Manheim Borough Manheim Community Pool Feasibility Study
BRC-‐TAG-‐13-‐193
$12,300 $12,300 13 Feasibility Studies (COMM)
$24,600 COMM_Key
Lancaster Manheim Borough Mummau Park BRC-‐ACQ-‐7-‐115
$43,850 $44,000 7 Acquisition (COMM)
$96,400 COMM_Key
Lancaster Manheim Borough Peer-‐to-‐Peer KEY-‐TAG-‐3-‐247
$7,500 $7,500 3 Peer-‐to-‐Peer Tech. Assistance (COMM)
$8,250 COMM_Key
Lancaster Manheim Central Recreation Commission
Comp. & Greenway Plan
BRC-‐TAG-‐6-‐105
$34,500 $34,500 6 Comp. Rec., Park, & Open Space Plans (COMM)
$69,000 COMM_Key
Lancaster Manheim Central Recreation Commission
Manheim Reg. Community Center Feasibility Study
BRC-‐TAG-‐9-‐127
$16,000 $16,000 9 Feasibility Studies (COMM)
$32,000 COMM_Key
Lancaster Manheim Central Recreation Commission
Rife Run Nature Path/Playground
BRC-‐PRD-‐11-‐54
$53,200 $53,200 11 Park Rehabilitation and Development (COMM)
$106,500 COMM_Key
Lancaster Manheim Township Dombach Land Acquisition
BRC-‐ACQ-‐7-‐116
$251,400 $200,000 7 Acquisition (COMM)
$672,400 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 326 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lancaster Manheim Township Overlook Park Expansion
KEY-‐ACQ-‐2-‐92
$235,000 $175,000 2 Acquisition (COMM)
$735,000 COMM_Key
Lancaster Manheim Township Perelman Park KEY-‐PRD-‐4-‐91
$125,000 $100,000 4 Park Rehabilitation and Development (COMM)
$257,825 COMM_Key
Lancaster Manheim Township Perelman, Jaycee and Landis Woods Parks Master Site Plans
BRC-‐TAG-‐18-‐148
$23,270 $23,200 18 Master Site Plans (COMM)
$46,540 COMM_Key
Lancaster Manor Township Comprehensive Recreation, Park and Open Space Plan
BRC-‐TAG-‐12-‐248
$25,000 $25,000 12 Comp. Rec., Park, & Open Space Plans (COMM)
$50,000 COMM_Key
Lancaster Manor Township Greider Park BRC-‐PRD-‐6-‐106
$29,930 $30,000 6 Park Rehabilitation and Development (COMM)
$59,860 COMM_Key
Lancaster Marietta Borough NW Lancaster County River Trail – Marietta Trailhead Acquisition
BRC-‐ACQ-‐17-‐96
$13,100 $13,100 17 Acquisition (COMM)
$26,200 COMM_Key
Lancaster Marietta Borough Susquehanna River Park
KEY-‐ACQ-‐1-‐78
$25,413 $25,000 1 Acquisition (COMM)
$50,826 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 327 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lancaster Millersville Borough Freedom Memorial Park
BRC-‐PRD-‐13-‐124
$154,400 $100,000 13 Park Rehabilitation and Development (COMM)
$308,800 COMM_Key
Lancaster Mount Joy Borough Grandview Elementary School Acquisition
BRC-‐ACQ-‐11-‐180
$250,000 $125,000 11 Acquisition (COMM)
$580,000 COMM_Key
Lancaster Mount Joy Borough Authority
Little Chickies Creek Watershed Conservation Plan
BRC-‐RCP-‐9-‐11
$30,000 $40,000 9 Planning (RIV) $80,000 RIVER_Key
Lancaster Mount Joy Township Cove Outlook Park BRC-‐PRD-‐13-‐128
$195,500 $150,000 13 Park Rehabilitation and Development (COMM)
$391,900 COMM_Key
Lancaster Mount Joy Township EAPA Property Acquisition/Conewago Trail
BRC-‐ACQ-‐14-‐62
$372,800 $250,000 14 Acquisition (COMM)
$745,500 COMM_Key
Lancaster Mount Joy Township Old Trolley Line Park Master Site Plan
BRC-‐TAG-‐17-‐14
$23,075 $15,000 17 Master Site Plans (COMM)
$46,150 COMM_Key
Lancaster Mount Joy Township Wolgemuth Park BRC-‐PRD-‐8-‐124
$277,500 $100,000 8 Park Rehabilitation and Development (COMM)
$555,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 328 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lancaster Mountville Borough Grubb Lake Park BRC-‐PRD-‐8-‐127
$152,300 $130,000 8 Park Rehabilitation and Development (COMM)
$304,500 COMM_Key
Lancaster Paradise Township Community Park KEY-‐SC-‐2-‐115
$20,000 $20,000 2 Small Communities/Small Projects (COMM)
$36,100 COMM_Key
Lancaster Pequea Township Silver Mine Park BRC-‐SC-‐7-‐153
$6,779 $7,000 7 Small Communities/Small Projects (COMM)
$13,559 COMM_Key
Lancaster Pequea Township Silver Mine Park KEY-‐ACQ-‐4-‐123
$135,000 $100,000 4 Acquisition (COMM)
$270,000 COMM_Key
Lancaster Pequea Township Silver Mine Park KEY-‐PRD-‐3-‐166
$65,600 $65,600 3 Park Rehabilitation and Development (COMM)
$131,200 COMM_Key
Lancaster Pequea Township Silver Mine Park Development
BRC-‐PRD-‐12-‐183
$33,600 $33,600 12 Park Rehabilitation and Development (COMM)
$67,200 COMM_Key
Lancaster Providence Township
Enola Low Grade Trail -‐ Providence to Quarryville – Development
BRC-‐RTD-‐18-‐171
$408,450 $408,400 18 Rail Rehabilitation and Development (RT)
$816,899 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 329 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lancaster Quarryville Borough SECA Circuit Rider-‐1st Year
BRC-‐TAG-‐7-‐4
$35,000 $90,405 7 Circuit Rider (COMM)
$146,065 COMM_Key
Lancaster Rapho Township Community Park -‐ Phase 2 Development
BRC-‐PRD-‐12-‐192
$300,000 $150,000 12 Park Rehabilitation and Development (COMM)
$605,500 COMM_Key
Lancaster Rapho Township Community Park -‐ Phase III
BRC-‐PRD-‐13.3-‐418
$200,000 $200,000 13.3 Park Rehabilitation and Development (COMM)
$401,600 COMM_Key
Lancaster Rapho Township Rapho Park-‐ Phase 4-‐ Development
BRC-‐PRD-‐16-‐156
$77,540 $77,000 16 Park Rehabilitation and Development (COMM)
$155,087 COMM_Key
Lancaster The Nature Conservancy
Rock Springs Barrens KEY-‐LTA-‐3-‐17
$240,000 $240,000 3 Critical Habitat Acquisition (LT)
$480,000 LT_Key
Lancaster Upper Leacock Township
Community Building Master Site Plan
BRC-‐TAG-‐8-‐199
$15,400 $15,000 8 Master Site Plans (COMM)
$31,800 COMM_Key
Lancaster Upper Leacock Township
Leola Comm. Park Master Plan & Pool Feas.Study
KEY-‐TAG-‐5-‐207
$12,900 $12,900 5 Feasibility Studies (COMM)
$25,800 COMM_Key
Lancaster Upper Leacock Township
Leola Community Pool
BRC-‐PRD-‐7-‐195
$249,900 $200,000 7 Park Rehabilitation and Development (COMM)
$672,786 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 330 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lancaster Upper Leacock Township
Leola Community Pool & Playground
BRC-‐PRD-‐10-‐139
$26,000 $26,000 10 Park Rehabilitation and Development (COMM)
$52,000 COMM_Key
Lancaster Upper Leacock Township
Olde Leacock Village KEY-‐PRD-‐4-‐156
$22,600 $22,600 4 Park Rehabilitation and Development (COMM)
$45,200 COMM_Key
Lancaster Upper Leacock Township
Peer-‐to-‐Peer KEY-‐TAG-‐5-‐235
$7,500 $7,500 5 Peer-‐to-‐Peer Tech. Assistance (COMM)
$8,250 COMM_Key
Lancaster Warwick Township Circuit Rider BRC-‐TAG-‐11-‐248
$95,125 $95,125 11 Circuit Rider (COMM)
$164,000 COMM_Key
Lancaster Warwick Township Feasibility Study KEY-‐RTP-‐3-‐24
$7,700 $7,700 3 Feasibility Studies (RT)
$15,400 RT_Key
Lancaster Warwick Township Linear Park-‐Phase II KEY-‐PRD-‐2-‐165
$77,100 $77,000 2 Park Rehabilitation and Development (COMM)
$154,200 COMM_Key
Lancaster Warwick Township Lititz/Warwick Comp. Recreation Park & Open Space
BRC-‐TAG-‐6-‐191
$25,000 $25,000 6 Comp. Rec., Park, & Open Space Plans (COMM)
$50,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 331 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lancaster Warwick Township Municipal Campus Expansion
BRC-‐PRD-‐11-‐96
$150,000 $125,000 11 Park Rehabilitation and Development (COMM)
$500,200 COMM_Key
Lancaster Warwick Township Peer to Peer BRC-‐TAG-‐9-‐237
$7,500 $7,500 9 Peer-‐to-‐Peer Tech. Assistance (COMM)
$8,250 COMM_Key
Lancaster Warwick Township Warwick Twp. Rails-‐To-‐Trails Park
KEY-‐RTD-‐5-‐20
$65,000 $65,000 5 Rail Rehabilitation and Development (RT)
$133,751 RT_Key
Lancaster West Cocalico Township
Schoeneck Park KEY-‐PRD-‐3-‐232
$73,800 $73,800 3 Park Rehabilitation and Development (COMM)
$148,800 COMM_Key
Lancaster West Donegal Township
Rheems Athletic Field
KEY-‐ACQ-‐3-‐233
$47,000 $40,000 3 Acquisition (COMM)
$94,000 COMM_Key
Lancaster West Earl Township Conestoga Valley Rec. Center Feasibility
KEY-‐TAG-‐3-‐234
$7,500 $7,500 3 Feasibility Studies (COMM)
$15,000 COMM_Key
Lancaster West Earl Township Eagle View Park -‐ Development
BRC-‐PRD-‐17-‐161
$100,000 $100,000 17 Park Rehabilitation and Development (COMM)
$200,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 332 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lancaster West Earl Township Lion's Club Park BRC-‐PRD-‐8-‐212
$70,000 $70,000 8 Park Rehabilitation and Development (COMM)
$140,000 COMM_Key
Lancaster West Lampeter Township
Jemet Property KEY-‐ACQ-‐2-‐172
$250,000 $175,000 2 Acquisition (COMM)
$500,000 COMM_Key
Lancaster, York
Lancaster County Conservancy
Holtwood Acquisition -‐ (PPL Land)
BRC-‐LTA-‐13.6-‐553
$4,200,000 $2,000,000 13.6 Open Space Acquisition (LT)
$20,141,900 LT_Key
Lancaster, York
Lancaster County Conservancy
PPL Lease Management Plan
BRC-‐LTP-‐14-‐213
$90,400 $90,000 14 Critical Habitat Planning (LT)
$180,799 LT_Key
Lancaster, York Lancaster County Conservancy
Susquehanna Riverlands Implementation 2014
BRC-SR-19-170
$160,112.00 $25,000.00 19 Partnerships Projects
$216,123.00 LT_Key
Lancaster, York Lancaster County Conservancy
Susquehanna Riverlands Implementation 2014
BRC-SR-19-170
$160,112.00 $25,000.00 19 Partnerships Projects
$216,123.00 LT_Key
Lancaster, York Lancaster County Conservancy
Susquehanna Riverlands Implementation 2014
BRC-SR-19-170
$160,112.00 $25,000.00 19 Partnerships Projects
$216,123.00 LT_Key
Lancaster, York Lancaster County Conservancy
Susquehanna Riverlands Implementation 2014
BRC-SR-19-170
$160,112.00 $25,000.00 19 Partnerships Projects
$216,123.00 LT_Key
Lancaster, York Lancaster County Conservancy
Susquehanna Riverlands Implementation 2014
BRC-SR-19-170
$160,112.00 $25,000.00 19 Partnerships Projects
$216,123.00 LT_Key
Lancaster, York Lancaster County Conservancy
Susquehanna Riverlands Implementation 2014
BRC-SR-19-170
$160,112.00 $25,000.00 19 Partnerships Projects
$216,123.00 LT_Key
Lancaster, York Lancaster County Conservancy
Susquehanna Riverlands Implementation 2014
BRC-SR-19-170
$160,112.00 $25,000.00 19 Partnerships Projects
$216,123.00 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 333 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lancaster, York Lancaster County Conservancy
Susquehanna Riverlands Implementation 2014
BRC-SR-19-170
$160,112.00 $25,000.00 19 Partnerships Projects
$216,123.00 LT_Key
Lancaster, York Lancaster County Conservancy
Susquehanna Riverlands Implementation 2014
BRC-SR-19-170
$160,112.00 $25,000.00 19 Partnerships Projects
$216,123.00 LT_Key
Lancaster, York Lancaster County Conservancy
Susquehanna Riverlands Implementation 2014
BRC-SR-19-170
$160,112.00 $25,000.00 19 Partnerships Projects
$216,123.00 LT_Key
Lancaster, York Lancaster County Conservancy
Susquehanna Riverlands Implementation 2014
BRC-SR-19-170
$160,112.00 $25,000.00 19 Partnerships Projects
$216,123.00 LT_Key
Lancaster, York Lancaster County Conservancy
Susquehanna Riverlands Implementation 2014
BRC-SR-19-170
$160,112.00 $25,000.00 19 Partnerships Projects
$216,123.00 LT_Key
Lancaster, York Lancaster County Conservancy
Susquehanna Riverlands Implementation 2014
BRC-SR-19-170
$160,112.00 $25,000.00 19 Partnerships Projects
$216,123.00 LT_Key
Lancaster, York Lancaster County Conservancy
Susquehanna Riverlands Implementation 2014
BRC-SR-19-170
$160,112.00 $25,000.00 19 Partnerships Projects
$216,123.00 LT_Key
Lawrence Bessemer Borough Bessemer Playground
BRC-‐SC-‐10-‐66
$14,800 $20,000 10 Small Communities/Small Projects (COMM)
$14,800 COMM_Key
Lawrence Ellport Borough William Rodgers Memorial Park
KEY-‐SC-‐2-‐45 $20,000 $20,000 2 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Lawrence Ellwood City Borough
Connoquennessing Creek Trail & River Access Study
BRC-‐TAG-‐14-‐203
$9,000 $9,000 14 Trail Study (COMM)
$18,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 334 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lawrence Ellwood City Borough
Ellwood City Community Plaza-‐ Development
BRC-‐PRD-‐16-‐132
$350,000 $350,000 16 Park Rehabilitation and Development (COMM)
$1,141,000 COMM_Key
Lawrence Ellwood City Borough
Ewing Park KEY-‐PRD-‐5-‐60
$25,000 $25,000 5 Park Rehabilitation and Development (COMM)
$50,000 COMM_Key
Lawrence Ellwood City Borough
Ewing Park Recreation Complex
BRC-‐PRD-‐12-‐152
$34,500 $34,500 12 Park Rehabilitation and Development (COMM)
$69,000 COMM_Key
Lawrence Ellwood City Borough
Ewing Park Trail BRC-‐PRD-‐7-‐66
$21,273 $21,000 7 Park Rehabilitation and Development (COMM)
$42,546 COMM_Key
Lawrence Ellwood City Borough
Trail Acquisition-‐Pennsylvania Power Co. Property
BRC-‐ACQ-‐9-‐72
$49,200 $49,000 9 Acquisition (COMM)
$98,500 COMM_Key
Lawrence Enon Valley Borough Caulfield Park-‐Phase1-‐2-‐Development
BRC-‐PRD-‐17-‐118
$158,047 $148,000 17 Park Rehabilitation and Development (COMM)
$358,094 COMM_Key
Lawrence Enon Valley Borough Master Site Plan for Caulfield Park
BRC-‐TAG-‐13.3-‐469
$12,500 $12,500 13.3 Master Site Plans (COMM)
$25,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 335 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lawrence Hickory Township C.J. Long Spartan Park
BRC-‐PRD-‐11-‐43
$137,500 $137,500 11 Park Rehabilitation and Development (COMM)
$275,000 COMM_Key
Lawrence Hickory Township C.J. Long Spartan Park
BRC-‐PRD-‐13-‐108
$313,500 $313,500 13 Park Rehabilitation and Development (COMM)
$627,000 COMM_Key
Lawrence Lawrence County East Side Community Center Feasibility Study
BRC-‐TAG-‐7-‐99
$10,000 $10,000 7 Feasibility Studies (COMM)
$20,000 COMM_Key
Lawrence Lawrence County Greenway and Open Space Plan
BRC-‐TAG-‐11.5-‐24
$25,000 $25,000 11.5 Greenway Plans (COMM)
$50,000 COMM_Key
Lawrence Lawrence County Mahoning River Watershed Conservation Plan
BRC-‐RCP-‐14-‐290
$50,000 $50,000 14 Planning (RIV) $100,000 COMM_Key
Lawrence Lawrence County Natural Heritage Inventory
BRC-‐TAG-‐6-‐92
$44,300 $44,300 6 Natural Areas Inventories (COMM)
$88,600 COMM_Key
Lawrence Lawrence County Stavich Bike Trail BRC-‐PRT-‐14-‐9
$224,300 $138,500 14 Development and Rehabilitation
$276,300 COMM_Key
Lawrence Lawrence County Two Boat Launches BRC-‐RCD-‐14-‐288
$45,000 $45,000 14 Development (RIV)
$90,000 COMM_Key
Lawrence Lawrence County Urban Tree Revitalization Project
BRC-‐PRD-‐15-‐57
$40,000 $40,000 15 Park Rehabilitation and Development (COMM)
$80,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 336 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lawrence Lawrence County West Park KEY-‐PRD-‐4-‐81
$47,500 $47,500 4 Park Rehabilitation and Development (COMM)
$97,300 COMM_Key
Lawrence Lawrence County West Park-‐Development
BRC-‐PRD-‐16-‐144
$37,000 $37,000 16 Park Rehabilitation and Development (COMM)
$74,000 COMM_Key
Lawrence Neshannock Township
Pearson Park BRC-‐PRD-‐9-‐147
$125,000 $125,000 9 Park Rehabilitation and Development (COMM)
$500,000 COMM_Key
Lawrence Neshannock Township
Pearson Park KEY-‐PRD-‐5-‐141
$50,000 $50,000 5 Park Rehabilitation and Development (COMM)
$164,342 COMM_Key
Lawrence New Castle City Cascade Park BRC-‐PRD-‐10-‐128
$38,755 $38,000 10 Park Rehabilitation and Development (COMM)
$77,510 COMM_Key
Lawrence New Castle City Cascade Park KEY-‐PRD-‐4-‐112
$155,262 $100,000 4 Park Rehabilitation and Development (COMM)
$310,525 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 337 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lawrence New Castle City Master Site Development Plan
KEY-‐TAG-‐1-‐92
$15,000 $15,000 1 Master Site Plans (COMM)
$30,000 COMM_Key
Lawrence New Castle City Urban Green Space Project
BRC-‐PRD-‐12-‐53
$200,000 $200,000 12 Park Rehabilitation and Development (COMM)
$400,000 COMM_Key
Lawrence New Wilmington Borough
Borough Park-‐Rehabilitation
BRC-‐PRD-‐15-‐64
$123,200 $65,000 15 Park Rehabilitation and Development (COMM)
$246,400 COMM_Key
Lawrence New Wilmington Borough
New Wilmington Borough Park Master Plan
BRC-‐TAG-‐13.3-‐482
$17,500 $17,500 13.3 Master Site Plans (COMM)
$35,000 COMM_Key
Lawrence New Wilmington Borough
Pool Renovation BRC-‐PRD-‐12-‐177
$199,300 $185,400 12 Park Rehabilitation and Development (COMM)
$398,600 COMM_Key
Lawrence North Beaver Township
Municipal Park KEY-‐SC-‐5-‐149
$20,000 $20,000 5 Small Communities/Small Projects (COMM)
$20,525 COMM_Key
Lawrence Shenango Township Community Park KEY-‐PRD-‐1-‐125
$203,798 $125,000 1 Park Rehabilitation and Development (COMM)
$407,596 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 338 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lawrence Shenango Township Community Park -‐ Phase II
KEY-‐PRD-‐5-‐181
$75,000 $75,000 5 Park Rehabilitation and Development (COMM)
$150,000 COMM_Key
Lawrence South New Castle Borough
Borough Park KEY-‐SC-‐2-‐144
$7,475 $7,400 2 Small Communities/Small Projects (COMM)
$8,475 COMM_Key
Lawrence Union Township Scotland Meadows Park Shelter
BRC-‐PRD-‐11-‐93
$35,400 $35,400 11 Park Rehabilitation and Development (COMM)
$70,800 COMM_Key
Lawrence Volant Borough Borough Park KEY-‐SC-‐2-‐162
$12,400 $12,400 2 Small Communities/Small Projects (COMM)
$14,900 COMM_Key
Lawrence Wilmington Township
Marti Park Phase II KEY-‐SC-‐2-‐179
$20,000 $20,000 2 Small Communities/Small Projects (COMM)
$21,000 COMM_Key
Lebanon Annville Township K & J Smith Land Acquisition -‐ Quittie Creek Nature Park Expansion
BRC-‐ACQ-‐17-‐87
$38,100 $36,100 17 Acquisition (COMM)
$76,200 COMM_Key
Lebanon Bethel Township Circuit Rider BRC-‐TAG-‐15-‐27
$50,000 $122,580 15 Circuit Rider (COMM)
$96,500 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 339 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lebanon Cleona Borough Cleona Park -‐ Phase I BRC-‐SC-‐11-‐111
$40,000 $40,000 11 Small Communities/Small Projects (COMM)
$89,200 COMM_Key
Lebanon East Hanover Township
H M Levitz Memorial Park Renovation
BRC-‐PRD-‐12-‐149
$172,200 $70,000 12 Park Rehabilitation and Development (COMM)
$344,400 COMM_Key
Lebanon Jackson Township Fairlane Avenue Acquisition
BRC-‐ACQ-‐13-‐34
$139,700 $39,000 13 Acquisition (COMM)
$279,400 COMM_Key
Lebanon Jackson Township Fairlane Avenue Park -‐ Phase 1 -‐ Development
BRC-‐PRD-‐17-‐125
$200,000 $200,000 17 Park Rehabilitation and Development (COMM)
$436,366 COMM_Key
Lebanon Jonestown Borough Community Park KEY-‐SC-‐5-‐101
$20,000 $20,000 5 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Lebanon Jonestown Borough Community Park-‐Phase II
BRC-‐SC-‐8-‐99
$30,000 $30,000 8 Small Communities/Small Projects (COMM)
$40,000 COMM_Key
Lebanon Jonestown Borough Master Plans-‐Irene Moore/Twin Creek Properties
BRC-‐TAG-‐10-‐155
$6,000 $6,000 10 Master Site Plans (COMM)
$12,000 COMM_Key
Lebanon Jonestown Borough Moore Property Acquisition
BRC-‐ACQ-‐9-‐105
$40,000 $40,000 9 Acquisition (COMM)
$80,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 340 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lebanon Lebanon City Coleman Memorial Park
KEY-‐PRD-‐3-‐111
$20,000 $20,000 3 Park Rehabilitation and Development (COMM)
$40,000 COMM_Key
Lebanon Lebanon City Coleman Memorial Park-‐Development
BRC-‐PRD-‐18-‐80
$451,335 $450,000 18 Park Rehabilitation and Development (COMM)
$951,570 COMM_Key
Lebanon Lebanon City Coleman's Park Master Site Plan
BRC-‐TAG-‐13.6-‐597
$40,000 $40,000 13.6 Master Site Plans (COMM)
$80,000 COMM_Key
Lebanon Lebanon City Gingrich Memorial Pool
BRC-‐PRD-‐6-‐94
$250,000 $200,000 6 Park Rehabilitation and Development (COMM)
$1,270,800 COMM_Key
Lebanon Lebanon City South Sixth Street Playground
BRC-‐PRD-‐13-‐114
$120,700 $120,000 13 Park Rehabilitation and Development (COMM)
$241,600 COMM_Key
Lebanon Lebanon City Tennis Courts-‐Three Sites
KEY-‐PRD-‐2-‐78
$67,500 $67,500 2 Park Rehabilitation and Development (COMM)
$135,000 COMM_Key
Lebanon Lebanon County Greenways, Park and Recreation Plan
BRC-‐TAG-‐14-‐2
$13,500 $13,500 14 Greenway Plans (COMM)
$27,000 COMM_Key
Lebanon Lebanon County Greenways, Park and Recreation Plan
BRC-‐TAG-‐9-‐112
$100,000 $100,000 9 Greenway Plans (COMM)
$653,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 341 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lebanon Lebanon County Lebanon Valley Rail Trail -‐ Cornwall Trailhead Expansion -‐ Development
BRC-‐PRD-‐18-‐175
$200,000 $125,000 18 Park Rehabilitation and Development (COMM)
$250,000 COMM_Key
Lebanon Lebanon County Lebanon Valley Rail Trail -‐ Phase -‐IV
BRC-‐RTD-‐14-‐280
$302,000 $300,000 14 Rail Rehabilitation and Development (RT)
$782,900 RT_Key
Lebanon Lebanon County Lebanon Valley Rail Trail -‐ Phase 9
BRC-‐RTD-‐16-‐245
$236,000 $236,000 16 Rail Rehabilitation and Development (RT)
$472,000 COMM_Key
Lebanon Lebanon County Lebanon Valley Rail-‐Trail -‐ Phase 4
BRC-‐RTA-‐9-‐7
$61,000 $61,000 9 Acquisition (RT) $122,000 RT_Key
Lebanon Lebanon County Lebanon Valley Rail-‐Trail – Phase 6 Feasibility Study
BRC-‐RTP-‐17-‐208
$12,500 $12,500 17 Feasibility Studies (RT)
$25,000 COMM_Key
Lebanon Lebanon County Lebanon Valley Rail-‐Trail-‐Phase III
BRC-‐RTD-‐8-‐10
$273,200 $273,000 8 Rail Rehabilitation and Development (RT)
$723,200 RT_Key
Lebanon Lebanon County Peer to Peer BRC-‐TAG-‐9-‐238
$7,500 $7,500 9 Peer-‐to-‐Peer Tech. Assistance (COMM)
$8,250 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 342 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lebanon Lebanon County Phase 5, Lebanon Valley Rail Trail
BRC-‐RTD-‐15-‐153
$272,502 $177,835 15 Rail Rehabilitation and Development (RT)
$620,647 COMM_Key
Lebanon Lebanon County Union Canal Tunnel Park
KEY-‐ACQ-‐2-‐79
$255,400 $250,000 2 Acquisition (COMM)
$510,800 COMM_Key
Lebanon Lebanon County Union Canal Tunnel Park
KEY-‐PRD-‐3-‐112
$100,000 $200,000 3 Park Rehabilitation and Development (COMM)
$200,000 COMM_Key
Lebanon Lebanon County Conservation District
TreeVitalize Metros BRC-‐TV-‐15-‐12
$50,000 $50,000 15 Park Rehabilitation and Development (COMM)
$100,000 COMM_Key
Lebanon Lebanon Valley Rails To Trails, Inc.
Feasibility Study KEY-‐RTP-‐3-‐10
$8,000 $8,000 3 Feasibility Studies (RT)
$16,000 RT_Key
Lebanon Millcreek Township White Swan Park KEY-‐SC-‐3-‐139
$20,000 $20,000 3 Small Communities/Small Projects (COMM)
$36,300 COMM_Key
Lebanon North Cornwall Township
Gloninger Woods Park- Development
BRC-PRD-19-100
$250,000.00 $250,000.00 19 Park Rehabilitation and Development (COMM)
$511,377.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 343 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lebanon North Cornwall Township
Gloninger Woods Park- Development
BRC-PRD-19-100
$250,000.00 $250,000.00 19 Park Rehabilitation and Development (COMM)
$511,377.00 COMM_Key
Lebanon North Cornwall Township
Gloninger Woods Park- Development
BRC-PRD-19-100
$250,000.00 $250,000.00 19 Park Rehabilitation and Development (COMM)
$511,377.00 COMM_Key
Lebanon North Lebanon Township
Comp Plan with Moyer Tract Master Site Plan
BRC-‐TAG-‐11-‐228
$23,800 $23,800 11 Comp. Rec., Park, & Open Space Plans (COMM)
$47,700 COMM_Key
Lebanon North Lebanon Township
Lenni Lenape Park-‐ Phase 1-‐ Development
BRC-‐PRD-‐16-‐150
$181,512 $181,500 16 Park Rehabilitation and Development (COMM)
$474,415 COMM_Key
Lebanon North Lebanon Township
Moyer Tract Acquisition
BRC-‐ACQ-‐9-‐151
$161,600 $110,000 9 Acquisition (COMM)
$323,200 COMM_Key
Lebanon Northern Lebanon Recreation and Parks Commission
Comp. Rec., Open Space and Greenway Plan
BRC-‐TAG-‐17-‐18
$29,000 $29,000 17 Comp. Rec., Park, & Open Space Plans (COMM)
$58,000 COMM_Key
Lebanon Palmyra Area Recreation and Parks Commission
Comp. Rec., Park and Open Space Plan
BRC-‐TAG-‐10-‐163
$12,500 $12,500 10 Comp. Rec., Park, & Open Space Plans (COMM)
$25,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 344 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lebanon Palmyra Borough Fireman's Park-‐Development
BRC-‐PRD-‐18-‐88
$230,020 $200,000 18 Park Rehabilitation and Development (COMM)
$498,576 COMM_Key
Lebanon South Lebanon Township
South Hills Park Acquisition
BRC-‐ACQ-‐9-‐194
$317,000 $150,000 9 Acquisition (COMM)
$634,000 COMM_Key
Lebanon South Lebanon Township
South LebanonTrail -‐ Phase 1 Development
BRC-‐PRD-‐12-‐201
$50,000 $35,800 12 Park Rehabilitation and Development (COMM)
$229,400 COMM_Key
Lebanon South Londonderry Township
Campbelltown Community Park-‐ Development
BRC-‐PRD-‐18-‐195
$193,261 $193,300 18 Park Rehabilitation and Development (COMM)
$391,000 COMM_Key
Lebanon South Londonderry Township
Lawn Community Park
KEY-‐PRD-‐4-‐144
$31,300 $31,300 4 Park Rehabilitation and Development (COMM)
$62,600 COMM_Key
Lebanon Swatara Creek Watershed Association, Inc.
Wise Property Acquisition
BRC-‐RCA-‐13.3-‐512
$192,100 $190,000 13.3 Acquisition (RIV)
$384,200 RIVER_Key
Lebanon Swatara Township Landis Land Acquisition
BRC-‐ACQ-‐9-‐203
$35,500 $35,000 9 Acquisition (COMM)
$70,000 COMM_Key
Lebanon Swatara Township Mill Street Park- Phase 3- Development
BRC-SC-19-51
$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)
$60,000.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 345 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lebanon Swatara Township Mill Street Park- Phase 3- Development
BRC-SC-19-51
$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)
$60,000.00 COMM_Key
Lebanon Swatara Township Mill Street Park- Phase 3- Development
BRC-SC-19-51
$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)
$60,000.00 COMM_Key
Lebanon Swatara Township Northern Lebanon Circuit Rider
BRC-TAG-19-199
$14,000.00 $14,000.00 19 Circuit Rider (COMM)
$76,685.00 COMM_Key
Lebanon Trout Unlimited, Doc Fritchey Chapter
Rausch Creek Watershed -‐ Phase I
BRC-‐RCD-‐14-‐294
$20,100 $20,100 14 Development (RIV)
$40,200 RIVER_Key
Lehigh Alburtis Borough Playground of Adventure II
BRC-‐SC-‐11-‐106
$20,000 $29,000 11 Small Communities/Small Projects (COMM)
$39,600 COMM_Key
Lehigh Allentown City Cedar Creek Parkway BRC-‐PRD-‐13-‐86
$377,500 $375,000 13 Park Rehabilitation and Development (COMM)
$755,100 COMM_Key
Lehigh Allentown City East Side Trail BRC-‐PRD-‐13.3-‐334
$125,000 $125,000 13.3 Park Rehabilitation and Development (COMM)
$250,000 COMM_Key
Lehigh Allentown City Jackson Street Community Park -‐ Development
BRC-‐PRD-‐16-‐118
$100,000 $100,000 16 Park Rehabilitation and Development (COMM)
$350,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 346 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lehigh Allentown City Jordan Creek Greenway -‐ Development
BRC-‐PRD-‐17-‐101
$385,459 $350,000 17 Park Rehabilitation and Development (COMM)
$778,459 COMM_Key
Lehigh Allentown City Jordan Meadows Park
KEY-‐PRD-‐2-‐2
$60,000 $60,000 2 Park Rehabilitation and Development (COMM)
$125,000 COMM_Key
Lehigh Allentown City Keck Park BRC-‐PRD-‐14-‐109
$400,000 $250,000 14 Park Rehabilitation and Development (COMM)
$808,000 COMM_Key
Lehigh Allentown City Lake Muhlenberg Restoration Feasibility Study
BRC-‐RCI-‐18-‐166
$20,232 $19,600 18 Implementation (RIV)
$45,220 COMM_Key
Lehigh Allentown City Martin Luther King & Little Lehigh Parkway Trail
BRC-‐PRD-‐16-‐119
$350,000 $350,000 16 Park Rehabilitation and Development (COMM)
$900,000 COMM_Key
Lehigh Allentown City Pool Feasibility Study BRC-‐TAG-‐13-‐175
$40,000 $40,000 13 Feasibility Studies (COMM)
$80,000 COMM_Key
Lehigh Allentown City Restoring Nature to Jordan Creek
BRC-‐RCD-‐18-‐164
$40,100 $40,100 18 Development (RIV)
$137,830 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 347 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lehigh Allentown City Stevens Park -‐ Development
BRC-‐PRD-‐17-‐100
$250,000 $250,000 17 Park Rehabilitation and Development (COMM)
$500,000 COMM_Key
Lehigh Allentown City Trail Study BRC-‐TAG-‐13-‐176
$50,000 $50,000 13 Trail Study (COMM)
$100,000 COMM_Key
Lehigh Catasauqua Borough Community Swimming Pool
KEY-‐PRD-‐2-‐24
$258,900 $250,000 2 Park Rehabilitation and Development (COMM)
$517,800 COMM_Key
Lehigh Catasauqua Borough D&L Trail -‐ Race Street to Kimmett’s Lock -‐ Development
BRC-‐PRD-‐17-‐206
$75,000 $75,000 17 Park Rehabilitation and Development (COMM)
$375,000 COMM_Key
Lehigh Emmaus Borough Swimming Pool KEY-‐PRD-‐1-‐47
$20,840 $20,800 1 Park Rehabilitation and Development (COMM)
$41,680 COMM_Key
Lehigh Fountain Hill Borough
Dodson Street Property Acquisition
BRC-‐ACQ-‐12-‐76
$102,600 $102,600 12 Acquisition (COMM)
$205,200 COMM_Key
Lehigh Fountain Hill Borough
Stanley Avenue Recreation Area
BRC-‐PRD-‐6-‐67
$99,000 $99,000 6 Park Rehabilitation and Development (COMM)
$203,520 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 348 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lehigh Fountain Hill Borough
Stanley Avenue Recreation Area -‐ Phase 9 Improve.
BRC-‐SC-‐9-‐78
$39,400 $39,000 9 Small Communities/Small Projects (COMM)
$59,400 COMM_Key
Lehigh Fountain Hill Borough
Stanley Avenue Recreation Area Master Plan
KEY-‐TAG-‐4-‐60
$13,900 $13,900 4 Master Site Plans (COMM)
$27,800 COMM_Key
Lehigh Fountain Hill Borough
Stanley Avenue Recreation Area Phase 5 Improvement
BRC-‐PRD-‐8-‐71
$74,900 $74,000 8 Park Rehabilitation and Development (COMM)
$149,800 COMM_Key
Lehigh Fountain Hill Borough
Swimming Pool Feasibility Study
BRC-‐TAG-‐14-‐207
$13,100 $13,100 14 Feasibility Studies (COMM)
$26,200 COMM_Key
Lehigh Lehigh County Cedar Creek Parkway West Master Site Plan
BRC-‐TAG-‐14-‐214
$20,000 $20,000 14 Master Site Plans (COMM)
$40,000 COMM_Key
Lehigh Lehigh County Cedar Creek Parkway West-‐ Phase 1-‐Development
BRC-‐PRD-‐18-‐81
$196,697 $197,000 18 Park Rehabilitation and Development (COMM)
$393,394 COMM_Key
Lehigh Lehigh County Cedar Creek Pedestrian Bridge Development
BRC-RCD-19-158
$65,000.00 $60,000.00 19 Development (RIV)
$130,000.00 COMM_Key
Lehigh Lehigh County Cedar Creek Pedestrian Bridge Development
BRC-RCD-19-158
$65,000.00 $60,000.00 19 Development (RIV)
$130,000.00 COMM_Key
Lehigh Lehigh County Cedar Creek Pedestrian Bridge Development
BRC-RCD-19-158
$65,000.00 $60,000.00 19 Development (RIV)
$130,000.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 349 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lehigh Lehigh County Delaware & Lehigh Trail Development Phase 2
BRC-‐PRD-‐16-‐8
$265,000 $84,300 16 Park Rehabilitation and Development (COMM)
$530,000 COMM_Key
Lehigh Lehigh County Game Preserve Renovations
KEY-‐ZOO-‐94-‐2
$215,000 $215,000 1 Zoo $430,000 COMM_Key
Lehigh Lehigh County Jordan Creek Greenway -‐ Segments 22-‐25 -‐ Development
BRC-‐PRD-‐18-‐176
$160,000 $100,000 18 Park Rehabilitation and Development (COMM)
$200,000 COMM_Key
Lehigh Lehigh County Jordan Creek Parkway Master Site Plan
BRC-TAG-19-135
$30,003.00 $30,000.00 19 Master Site Plans (COMM)
$60,006.00 COMM_Key
Lehigh Lehigh County Jordan Creek Parkway Master Site Plan
BRC-TAG-19-135
$30,003.00 $30,000.00 19 Master Site Plans (COMM)
$60,006.00 COMM_Key
Lehigh Lehigh County Jordan Creek Parkway Master Site Plan
BRC-TAG-19-135
$30,003.00 $30,000.00 19 Master Site Plans (COMM)
$60,006.00 COMM_Key
Lehigh Lehigh County Jordan Creek Parkway Master Site Plan
BRC-TAG-19-135
$30,003.00 $30,000.00 19 Master Site Plans (COMM)
$60,006.00 COMM_Key
Lehigh Lehigh County Lehigh County Parks-‐ Eight Sites
BRC-‐PRD-‐14-‐148
$18,900 $18,900 14 Park Rehabilitation and Development (COMM)
$54,200 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 350 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lehigh Lehigh County Lehigh County Sports Fields
BRC-‐PRD-‐6-‐96
$175,000 $175,000 6 Park Rehabilitation and Development (COMM)
$409,000 COMM_Key
Lehigh Lehigh County Lehigh Mountain Acquisition
BRC-‐ACQ-‐11.5-‐8
$458,500 $200,000 11.5 Acquisition (COMM)
$917,000 COMM_Key
Lehigh Lehigh County Lehigh Mountain Park -‐ Phase 1-‐ Development
BRC-‐PRD-‐17-‐131
$25,000 $25,000 17 Park Rehabilitation and Development (COMM)
$50,002 COMM_Key
Lehigh Lehigh County Natural Areas Inventory
KEY-‐TAG-‐2-‐81
$39,984 $39,900 2 Natural Areas Inventories (COMM)
$84,984 COMM_Key
Lehigh Lehigh County Planning Block Grant BRC-‐TAG-‐11.5-‐25
$165,000 $140,000 11.5 Education and Training (COMM)
$330,000 COMM_Key
Lehigh Lehigh County Trexler Nature Preserve Environmental Center
BRC-‐PRD-‐13.6-‐572
$245,000 $420,000 13.6 Park Rehabilitation and Development (COMM)
$750,000 COMM_Key
Lehigh Lehigh County Trexler-‐Lehigh Co.Game Preserve
KEY-‐PRD-‐3-‐114
$250,000 $225,000 3 Park Rehabilitation and Development (COMM)
$929,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 351 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lehigh Lehigh County Velodrome KEY-‐PRD-‐2-‐80
$1,200,000 $250,000 2 Park Rehabilitation and Development (COMM)
$2,729,376 COMM_Key
Lehigh Lehigh Valley Planning Commission
Greenways Plan BRC-‐TAG-‐9-‐114
$72,950 $72,950 9 Greenway Plans (COMM)
$145,900 COMM_Key
Lehigh Lower Macungie Township
Camp Olympic Master Site Plan
BRC-‐TAG-‐14-‐216
$60,500 $60,500 14 Master Site Plans (COMM)
$121,000 COMM_Key
Lehigh Lower Macungie Township
Camp Olympic Park -‐ Development
BRC-‐PRD-‐17-‐134
$60,000 $60,000 17 Park Rehabilitation and Development (COMM)
$120,000 COMM_Key
Lehigh Lower Macungie Township
Comprehensive Recreation, Open Space & Greenway Plan
BRC-‐TAG-‐15-‐96
$40,000 $80,000 15 Greenway Plans (COMM)
$80,000 COMM_Key
Lehigh Lower Macungie Township
Lower Macungie Township Greenway Trail Links – Development
BRC-PRD-19-92
$200,000.00 $125,000.00 19 Park Rehabilitation and Development (COMM)
$250,035.00 COMM_Key
Lehigh Lower Macungie Township
Lower Macungie Township Greenway Trail Links – Development
BRC-PRD-19-92
$200,000.00 $125,000.00 19 Park Rehabilitation and Development (COMM)
$250,035.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 352 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lehigh Lower Macungie Township
Lower Macungie Township Greenway Trail Links – Development
BRC-PRD-19-92
$200,000.00 $125,000.00 19 Park Rehabilitation and Development (COMM)
$250,035.00 COMM_Key
Lehigh Lynn Township Ontelaunee Park BRC-‐SC-‐11-‐135
$33,600 $33,000 11 Small Communities/Small Projects (COMM)
$53,600 COMM_Key
Lehigh Lynn Township Ontelaunee Park Swimming Pool
BRC-‐TAG-‐7-‐113
$7,000 $7,000 7 Feasibility Studies (COMM)
$14,000 COMM_Key
Lehigh Lynn Township Ontelaunee Park/Trail
BRC-‐ACQ-‐6-‐102
$180,400 $180,000 6 Acquisition (COMM)
$435,800 COMM_Key
Lehigh North Whitehall Township
Levans Road Recreation Area Expansion
BRC-‐ACQ-‐7-‐141
$150,000 $150,000 7 Acquisition (COMM)
$446,500 COMM_Key
Lehigh North Whitehall Township
Minnich Tract KEY-‐ACQ-‐3-‐158
$100,000 $100,000 3 Acquisition (COMM)
$280,000 COMM_Key
Lehigh North Whitehall Township
Neffs Valley Park Acquisition
BRC-‐ACQ-‐12.5-‐18
$250,000 $250,000 12.5 Acquisition (COMM)
$545,000 COMM_Key
Lehigh North Whitehall Township
Paranchok Park BRC-‐PRD-‐9-‐154
$200,000 $150,000 9 Park Rehabilitation and Development (COMM)
$512,000 COMM_Key
Lehigh North Whitehall Township
Recreation Park-‐Development
BRC-‐PRD-‐17-‐143
$55,280 $55,200 17 Park Rehabilitation and Development (COMM)
$110,560 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 353 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lehigh North Whitehall Township
Schlechter Property Acquisition
BRC-‐ACQ-‐16-‐25
$39,300 $37,300 16 Acquisition (COMM)
$78,600 COMM_Key
Lehigh North Whitehall Township
Schnecksville Park KEY-‐PRD-‐5-‐151
$150,000 $125,000 5 Park Rehabilitation and Development (COMM)
$558,660 COMM_Key
Lehigh North Whitehall Township
Township Park KEY-‐ACQ-‐1-‐100
$101,500 $71,000 1 Acquisition (COMM)
$203,000 COMM_Key
Lehigh Salisbury Township Franko Farm -‐ Phase III
KEY-‐PRD-‐3-‐190
$100,000 $100,000 3 Park Rehabilitation and Development (COMM)
$220,000 COMM_Key
Lehigh Salisbury Township Franko Farm Recreation Area
KEY-‐PRD-‐1-‐121
$100,000 $50,000 1 Park Rehabilitation and Development (COMM)
$200,000 COMM_Key
Lehigh Salisbury Township Lindberg Park - Development
BRC-PRD-19-111
$177,000.00 $177,000.00 19 Park Rehabilitation and Development (COMM)
$425,620.00 COMM_Key
Lehigh Salisbury Township Lindberg Park - Development
BRC-PRD-19-111
$177,000.00 $177,000.00 19 Park Rehabilitation and Development (COMM)
$425,620.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 354 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lehigh Salisbury Township Lindberg Park - Development
BRC-PRD-19-111
$177,000.00 $177,000.00 19 Park Rehabilitation and Development (COMM)
$425,620.00 COMM_Key
Lehigh Salisbury Township Lindberg Park - Development
BRC-PRD-19-111
$177,000.00 $177,000.00 19 Park Rehabilitation and Development (COMM)
$425,620.00 COMM_Key
Lehigh Salisbury Township Lindberg Park Master Site Plan
BRC-‐TAG-‐17-‐20
$22,400 $22,400 17 Master Site Plans (COMM)
$44,800 COMM_Key
Lehigh Slatington Borough Main Street Park Development
BRC-‐SC-‐12-‐123
$40,000 $40,000 12 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Lehigh Slatington Borough Roosevelt Park KEY-‐PRD-‐2-‐140
$37,710 $37,700 2 Park Rehabilitation and Development (COMM)
$78,500 COMM_Key
Lehigh Slatington Borough Slate Heritage Rail Trail
BRC-‐SC-‐11-‐155
$39,800 $39,000 11 Small Communities/Small Projects (COMM)
$59,700 COMM_Key
Lehigh Slatington Borough Victory Park KEY-‐SC-‐5-‐183
$20,000 $20,000 5 Small Communities/Small Projects (COMM)
$20,650 COMM_Key
Lehigh South Whitehall Township
Covered Bridge Park Master Site Plan
BRC-‐TAG-‐17-‐22
$30,000 $30,000 17 Feasibility Studies (COMM)
$60,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 355 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lehigh South Whitehall Township
Jordan Creek Greenway – Segments 48-50 – Development
BRC-PRD-19-118
$756,472.00 $250,000.00 19 Park Rehabilitation and Development (COMM)
$1,506,472.00 COMM_Key
Lehigh South Whitehall Township
Jordan Creek Greenway – Segments 48-50 – Development
BRC-PRD-19-118
$756,472.00 $250,000.00 19 Park Rehabilitation and Development (COMM)
$1,506,472.00 COMM_Key
Lehigh South Whitehall Township
Jordan Creek Greenway – Segments 48-50 – Development
BRC-PRD-19-118
$756,472.00 $250,000.00 19 Park Rehabilitation and Development (COMM)
$1,506,472.00 COMM_Key
Lehigh South Whitehall Township
Park, Recreation & Open Space Plan
BRC-‐TAG-‐12-‐261
$22,500 $22,500 12 Comp. Rec., Park, & Open Space Plans (COMM)
$45,000 COMM_Key
Lehigh Upper Macungie Township
Grange Road Park -‐ Development
BRC-‐PRD-‐16-‐164
$122,105 $122,000 16 Park Rehabilitation and Development (COMM)
$244,210 COMM_Key
Lehigh Upper Macungie Township
Upper Macungie Park
KEY-‐ACQ-‐3-‐224
$340,000 $200,000 3 Acquisition (COMM)
$680,000 COMM_Key
Lehigh Upper Saucon Township
Community Park Master Site Plan
BRC-‐TAG-‐18-‐152
$25,000 $25,000 18 Master Site Plans (COMM)
$50,000 COMM_Key
Lehigh Upper Saucon Township
Haring and Curly Horse Parks Master Site Plan
BRC-‐TAG-‐17-‐26
$50,000 $50,000 17 Master Site Plans (COMM)
$100,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 356 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lehigh Upper Saucon Township
Saucon Valley Rail Trail -‐ Saucon Township Community Park – Development
BRC-‐PRD-‐18-‐104
$32,500 $32,500 18 Park Rehabilitation and Development (COMM)
$65,000 COMM_Key
Lehigh Washington Township
Eagle's Nest Environmental Center
BRC-‐PRD-‐7-‐200
$85,000 $85,000 7 Park Rehabilitation and Development (COMM)
$236,400 COMM_Key
Lehigh Washington Township
Eagle's Nest Park KEY-‐ACQ-‐2-‐169
$46,000 $46,000 2 Acquisition (COMM)
$100,618 COMM_Key
Lehigh Washington Township
Eagle's Nest Park -‐ Phase II
KEY-‐PRD-‐5-‐215
$94,500 $94,500 5 Park Rehabilitation and Development (COMM)
$189,000 COMM_Key
Lehigh Washington Township
Schuylkill & Lehigh Rail Trail
BRC-‐RTP-‐7-‐18
$45,000 $30,000 7 Master Plans (RT)
$90,000 RT_Key
Lehigh Washington Township
Schuylkill and Lehigh Rail-‐Trail
KEY-‐RTA-‐5-‐22
$18,426 $18,400 5 Acquisition (RT) $36,852 RT_Key
Lehigh Washington Township
Slate Heritage Trail Construction -‐ Phase I
BRC-‐RTD-‐11-‐13
$179,200 $140,000 11 Rail Rehabilitation and Development (RT)
$308,500 RIVER_Key
Keystone Fund Projects by County (1994-‐2013)
Page 357 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lehigh Whitehall Township Ironton Rail Trail -‐ Stair Access & Picnic Area
BRC-‐RTD-‐13.3-‐504
$20,700 $20,000 13.3 Rail Rehabilitation and Development (RT)
$41,300 RT_Key
Lehigh Whitehall Township Ironton Rail Trail Improvements
BRC-‐RTD-‐11-‐14
$40,400 $40,000 11 Rail Rehabilitation and Development (RT)
$80,800 RT_Key
Lehigh Whitehall Township Ironton Rail Trail Spur Paving
BRC-‐PRD-‐18-‐180
$180,173 $123,800 18 Park Rehabilitation and Development (COMM)
$247,611 COMM_Key
Lehigh Whitehall Township Ironton Rail-‐Trail BRC-‐RTD-‐7-‐19
$72,000 $55,000 7 Rail Rehabilitation and Development (RT)
$110,000 RT_Key
Lehigh Whitehall Township Ironton Rail-‐Trail KEY-‐RTD-‐3-‐26
$14,500 $14,500 3 Rail Rehabilitation and Development (RT)
$29,500 RT_Key
Lehigh Whitehall Township Ironton Rail-‐Trail KEY-‐RTD-‐5-‐23
$180,000 $40,000 5 Rail Rehabilitation and Development (RT)
$360,000 RT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 358 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lehigh Whitehall Township Ironton Rail-‐Trail Improvements
BRC-‐RTD-‐10-‐17
$36,230 $35,000 10 Rail Rehabilitation and Development (RT)
$73,000 RT_Key
Lehigh Whitehall Township Ironton Railroad Trail KEY-‐RTA-‐95-‐20
$52,500 $52,500 1 Acquisition (RT) $262,500 RT_Key
Lehigh Whitehall Township Jordan Creek Greenway-‐Phase 1
BRC-‐PRD-‐16-‐167
$250,000 $230,000 16 Park Rehabilitation and Development (COMM)
$587,160 COMM_Key
Lehigh Wildlands Conservancy, Inc.
Camp Olympic Acquisition
BRC-‐LTA-‐13-‐28
$300,000 $300,000 13 Open Space Acquisition (LT)
$958,000 LT_Key
Lehigh Wildlands Conservancy, Inc.
DeAngelis Property Acquisition
BRC-‐LTA-‐18-‐23
$21,000 $21,000 18 Open Space Acquisition (LT)
$42,000 LT_Key
Lehigh Wildlands Conservancy, Inc.
Hersh Property Acquisition
BRC-‐LTA-‐12.5-‐13
$32,500 $32,000 12.5 Open Space Acquisition (LT)
$65,000 LT_Key
Lehigh Wildlands Conservancy, Inc.
Jordan Creek Watershed Assesment
KEY-‐RCP-‐96-‐02
$65,000 $65,000 3 Planning (RIV) $130,000 RIVER_Key
Lehigh Wildlands Conservancy, Inc.
Native habitat restoration and education in an urban park
BRC-‐RCD-‐16-‐180
$47,640 $48,800 16 Development (RIV)
$97,620 RIVER_Key
Lehigh Wildlands Conservancy, Inc.
Nature Center Renovations
KEY-‐ZOO-‐94-‐7
$35,000 $35,000 1 Zoo $70,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 359 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lehigh Wildlands Conservancy, Inc.
Persing Property Acquisition
BRC-‐LTA-‐18-‐25
$84,250 $76,700 18 Open Space Acquisition (LT)
$168,500 LT_Key
Lehigh Wildlands Conservancy, Inc.
Restoring Nature to Trexler Nature Preserve
BRC-‐RCI-‐17-‐170
$30,000 $30,000 17 Implementation (RIV)
$62,001 RIVER_Key
Lehigh, Northampton
Bethlehem City Johnston Park Restoration
BRC-‐RCD-‐9-‐2
$125,000 $125,000 9 Development (RIV)
$250,000 RIVER_Key
Lehigh, Northampton
Lehigh County TreeVitalize Lehigh Valley
BRC-‐TV-‐14-‐4
$200,000 $262,000 14 Park Rehabilitation and Development (COMM)
$600,000 COMM_Key
Lehigh, Northampton
Lehigh Valley Planning Commission
Lehigh Valley Conservation Greenways Analysis
BRC-‐TAG-‐16-‐61
$80,000 $30,000 16 Natural Areas Inventories (COMM)
$160,000 COMM_Key
Lehigh, Northampton
Upper Saucon Township
Upper and Lower Saucon Twp. Joint Rec & Pk Plan
BRC-‐TAG-‐9-‐215
$27,500 $27,000 9 Comp. Rec., Park, & Open Space Plans (COMM)
$55,000 COMM_Key
Luzerne Anthracite Scenic Trails Association
Back Mountain Trail BRC-‐RTD-‐8-‐20
$90,000 $27,000 8 Rail Rehabilitation and Development (RT)
$660,000 RT_Key
Luzerne Ashley Borough Bobby Strish Memorial Park
KEY-‐PRD-‐4-‐10
$25,000 $25,000 4 Park Rehabilitation and Development (COMM)
$50,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 360 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Luzerne Avoca Borough L & L Railroad Parcel Acquisition
BRC-‐ACQ-‐13.3-‐272
$12,400 $12,300 13.3 Acquisition (COMM)
$24,800 COMM_Key
Luzerne Avoca Borough Plane Street Park KEY-‐SC-‐5-‐10 $15,100 $15,100 5 Small Communities/Small Projects (COMM)
$21,000 COMM_Key
Luzerne Avoca Borough West Avoca Park BRC-‐SC-‐13.3-‐289
$19,900 $20,000 13.3 Small Communities/Small Projects (COMM)
$19,900 COMM_Key
Luzerne Black Creek Township
Community Park Enhancement
BRC-‐SC-‐12-‐84
$25,000 $25,000 12 Small Communities/Small Projects (COMM)
$30,000 COMM_Key
Luzerne Butler Township Beltrami Land Acquision -‐ (Recreation Complex)
BRC-‐ACQ-‐13.6-‐579
$452,500 $250,000 13.6 Acquisition (COMM)
$905,000 COMM_Key
Luzerne Butler Township Butler Community Park-‐Phase II
BRC-‐PRD-‐7-‐30
$84,019 $84,000 7 Park Rehabilitation and Development (COMM)
$192,609 COMM_Key
Luzerne Butler Township Community Park-‐Phase I
KEY-‐PRD-‐2-‐22
$99,000 $99,000 2 Park Rehabilitation and Development (COMM)
$198,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 361 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Luzerne Butler Township Freedom Park - Phase 1– Development
BRC-PRD-19-64
$440,400.00 $200,000.00 19 Park Rehabilitation and Development (COMM)
$880,800.00 COMM_Key
Luzerne Butler Township Freedom Park - Phase 1– Development
BRC-PRD-19-64
$440,400.00 $200,000.00 19 Park Rehabilitation and Development (COMM)
$880,800.00 COMM_Key
Luzerne Butler Township Freedom Park - Phase 1– Development
BRC-PRD-19-64
$440,400.00 $200,000.00 19 Park Rehabilitation and Development (COMM)
$880,800.00 COMM_Key
Luzerne Butler Township Trail Development -‐ Phase IA
BRC-‐PRD-‐13-‐341
$30,000 $60,000 13 Park Rehabilitation and Development (COMM)
$120,000 COMM_Key
Luzerne Conyngham Borough Conyngham Valley Nature Park-‐ Rehabilitation
BRC-‐SC-‐15-‐76
$40,000 $40,000 15 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Luzerne Dallas Borough Kenneth Young Memorial Park -‐ Master Site Plan
BRC-‐TAG-‐12-‐233
$18,000 $18,000 12 Master Site Plans (COMM)
$36,000 COMM_Key
Luzerne Dorrance Township Recreation Area KEY-‐SC-‐3-‐49 $8,700 $9,000 3 Small Communities/Small Projects (COMM)
$9,300 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 362 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Luzerne Dupont Borough Little League Park Renovation
BRC-‐SC-‐12-‐90
$20,200 $20,200 12 Small Communities/Small Projects (COMM)
$40,400 COMM_Key
Luzerne Duryea Borough Community Park BRC-‐SC-‐14-‐81
$40,000 $40,000 14 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Luzerne Exeter Borough Peer-‐to-‐Peer BRC-‐TAG-‐10-‐7
$7,500 $7,500 10 Peer-‐to-‐Peer Tech. Assistance (COMM)
$8,250 COMM_Key
Luzerne Exeter Borough West Side Trail -‐ Phase 1
BRC-‐PRD-‐9-‐73
$72,408 $70,000 9 Park Rehabilitation and Development (COMM)
$419,559 COMM_Key
Luzerne Exeter Borough West Side Trail Project
BRC-‐TAG-‐7-‐69
$34,287 $34,000 7 Greenway Plans (COMM)
$68,574 COMM_Key
Luzerne Fairview Township Memorial Park KEY-‐SC-‐4-‐56 $20,000 $20,000 4 Small Communities/Small Projects (COMM)
$22,089 COMM_Key
Luzerne Fairview Township Memorial Park Master Site Plan
BRC-‐TAG-‐17-‐7
$8,000 $8,000 17 Master Site Plans (COMM)
$15,998 COMM_Key
Luzerne Foster Township Upper Lehigh Park-‐Developmemt
BRC-‐SC-‐18-‐31
$40,000 $40,000 18 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 363 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Luzerne Freeland Borough 4th Ward Playground Renovations
BRC-‐SC-‐12-‐97
$25,000 $30,000 12 Small Communities/Small Projects (COMM)
$40,000 COMM_Key
Luzerne Freeland Borough Celentano Land Acquisition
BRC-‐ACQ-‐13.6-‐582
$10,650 $10,600 13.6 Acquisition (COMM)
$21,300 COMM_Key
Luzerne Freeland Borough Front Street Park KEY-‐SC-‐5-‐71 $20,000 $20,000 5 Small Communities/Small Projects (COMM)
$21,220 COMM_Key
Luzerne Greater Hazleton Area Civic Partnership
Ashmore Pedestrian Bridge
BRC-‐RTD-‐13.3-‐367
$35,200 $35,200 13.3 Park Rehabilitation and Development (COMM)
$266,200 RT_Key
Luzerne Greater Hazleton Area Civic Partnership
Gr. Hazleton Rails-‐to-‐Trails Master Plan-‐Phase 2/3
BRC-‐RTP-‐11-‐7
$35,000 $35,000 11 Master Plans (RT)
$70,000 RT_Key
Luzerne Greater Hazleton Area Civic Partnership
Greater Hazleton Area Rail-‐Trail Development
BRC-‐RTD-‐11-‐6
$31,700 $31,700 11 Rail Rehabilitation and Development (RT)
$63,400 RT_Key
Luzerne Greater Hazleton Area Civic Partnership
Greater Hazleton Rails-‐to-‐Trails -‐ Phase II
BRC-‐RTD-‐14-‐279
$295,200 $295,200 14 Rail Rehabilitation and Development (RT)
$590,400 RT_Key
Luzerne Greater Hazleton Area Civic Partnership
Hazleton-‐Eckley Trail BRC-‐RTP-‐7-‐6
$35,000 $37,500 7 Feasibility Studies (RT)
$76,000 RT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 364 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Luzerne Hazleton City Helping Hands Playground
KEY-‐PRD-‐1-‐59
$150,000 $110,000 1 Park Rehabilitation and Development (COMM)
$327,100 COMM_Key
Luzerne Hollenback Township
Hollenback Township Community Park-‐Development
BRC-‐SC-‐18-‐34
$19,994 $20,000 18 Small Communities/Small Projects (COMM)
$33,671 COMM_Key
Luzerne Hunlock Township Municipal Park Master Site Plan
BRC-‐TAG-‐14-‐211
$15,000 $15,000 14 Master Site Plans (COMM)
$30,000 COMM_Key
Luzerne Jackson Township Recreation Area BRC-‐SC-‐14-‐90
$37,100 $37,100 14 Small Communities/Small Projects (COMM)
$51,200 COMM_Key
Luzerne Jenkins Township May Park KEY-‐SC-‐3-‐98 $20,000 $20,000 3 Small Communities/Small Projects (COMM)
$53,000 COMM_Key
Luzerne Kingston Municipality
Master Site Development Plan
KEY-‐TAG-‐1-‐66
$10,000 $10,000 1 Master Site Plans (COMM)
$20,000 COMM_Key
Luzerne Laflin Borough Borough Park KEY-‐SC-‐3-‐103
$19,200 $19,200 3 Small Communities/Small Projects (COMM)
$19,200 COMM_Key
Luzerne Laflin Borough Pavilion Improvements
BRC-‐SC-‐11-‐132
$20,000 $20,000 11 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 365 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Luzerne Luzerne Borough Borough Recreation Complex
KEY-‐SC-‐3-‐123
$61,000 $20,000 3 Small Communities/Small Projects (COMM)
$122,000 COMM_Key
Luzerne Luzerne County Greenway Plan KEY-‐TAG-‐3-‐124
$50,000 $50,000 3 Greenway Plans (COMM)
$100,000 COMM_Key
Luzerne Luzerne County Luzerne County Recreation Complex
BRC-‐PRD-‐9-‐125
$112,300 $110,000 9 Park Rehabilitation and Development (COMM)
$224,600 COMM_Key
Luzerne Luzerne County Moon Lake Park Improvements
BRC-‐PRD-‐11-‐53
$107,800 $100,000 11 Park Rehabilitation and Development (COMM)
$215,600 COMM_Key
Luzerne Luzerne County Moon Lake Park Master Plan/Feasibility Study
BRC-‐TAG-‐14-‐218
$40,000 $60,000 14 Master Site Plans (COMM)
$80,000 COMM_Key
Luzerne Luzerne County Natural Areas Inventory
KEY-‐TAG-‐5-‐119
$42,500 $42,500 5 Natural Areas Inventories (COMM)
$85,000 COMM_Key
Luzerne Luzerne County Nesbitt Park BRC-‐PRD-‐13-‐120
$400,000 $400,000 13 Park Rehabilitation and Development (COMM)
$800,000 COMM_Key
Luzerne Luzerne County Theta Lands/ Crystal Lake Acquisition
BRC-‐ACQ-‐8-‐109
$733,000 $280,000 8 Acquisition (COMM)
$1,500,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 366 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Luzerne Luzerne County Redevelopment Authority
Knox Mine Disaster Park
BRC-‐PRD-‐13.3-‐390
$9,500 $10,000 13.3 Park Rehabilitation and Development (COMM)
$63,500 COMM_Key
Luzerne Nanticoke City Comprehensive Rec., Park and Open Space Plan
KEY-‐TAG-‐5-‐140
$25,000 $25,000 5 Comp. Rec., Park, & Open Space Plans (COMM)
$50,000 COMM_Key
Luzerne Nanticoke City Greater Nanticoke Area Park -‐ Development
BRC-‐PRD-‐17-‐142
$60,485 $60,400 17 Park Rehabilitation and Development (COMM)
$120,970 COMM_Key
Luzerne Natural Lands Trust, Inc.
Haas Property Acquisition -‐ Bear Creek Preserve
BRC-‐LTA-‐12-‐25
$1,731,000 $1,731,000 12 Open Space Acquisition (LT)
$3,462,000 LT_Key
Luzerne North Branch Land Trust
American Legion Conservation Easement
BRC-‐LTA-‐13-‐29
$555,700 $553,000 13 Critical Habitat Acquisition (LT)
$1,111,400 LT_Key
Luzerne North Branch Land Trust
Bear Creek Camp Easement
BRC-‐LTA-‐13-‐30
$1,593,400 $1,593,300 13 Critical Habitat Acquisition (LT)
$3,186,700 LT_Key
Luzerne North Branch Land Trust
Bear Creek Lake View Acquisition
BRC-‐LTA-‐16-‐34
$251,250 $251,000 16 Open Space Acquisition (LT)
$502,500 LT_Key
Luzerne North Branch Land Trust
Butler Enterprises Land Acquisition
BRC-‐LTA-‐16-‐35
$282,000 $282,000 16 Open Space Acquisition (LT)
$564,000 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 367 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Luzerne North Branch Land Trust
CDR Acquisition BRC-‐LTA-‐14-‐40
$329,400 $328,000 14 Open Space Acquisition (LT)
$658,800 LT_Key
Luzerne North Branch Land Trust
Earth Conservancy at Mocanaqua Fee Acquisition
BRC-LTA-19-207
########## ########## 19 Open Space Acquisition (LT)
$8,643,400.00 LT_Key
Luzerne North Branch Land Trust
Earth Conservancy at Mocanaqua Fee Acquisition
BRC-LTA-19-207
########## ########## 19 Open Space Acquisition (LT)
$8,643,400.00 LT_Key
Luzerne North Branch Land Trust
Earth Conservancy at Mocanaqua Fee Acquisition
BRC-LTA-19-207
########## ########## 19 Open Space Acquisition (LT)
$8,643,400.00 LT_Key
Luzerne North Branch Land Trust
Earth Conservancy at Mocanaqua Fee Acquisition
BRC-LTA-19-207
########## ########## 19 Open Space Acquisition (LT)
$8,643,400.00 LT_Key
Luzerne North Branch Land Trust
Earth Conservancy at Mocanaqua Fee Acquisition
BRC-LTA-19-207
########## ########## 19 Open Space Acquisition (LT)
$8,643,400.00 LT_Key
Luzerne North Branch Land Trust
Mack Property Acquisition
BRC-‐LTA-‐18-‐15
$880,306 $850,000 18 Open Space Acquisition (LT)
$1,760,613 LT_Key
Luzerne North Branch Land Trust
Valmont Bog Acquisition
BRC-‐LTA-‐16-‐36
$364,050 $362,700 16 Open Space Acquisition (LT)
$1,023,000 LT_Key
Luzerne Pennsylvania Environmental Council, Inc.
DL&W Master Development Plan
KEY-‐RTP-‐95-‐22
$25,000 $25,000 1 Master Plans (RT)
$50,000 RT_Key
Luzerne Pennsylvania Environmental Council, Inc.
The Lands at Hillside Invasive Species Removal Project
BRC-‐RCD-‐13-‐8
$50,000 $50,000 13 Development (RIV)
$100,000 RIVER_Key
Luzerne Pennsylvania Environmental Council, Inc.
Wyoming Valley Water Trail
BRC-‐RCP-‐8-‐28
$32,500 $25,000 8 Planning (RIV) $65,000 RIVER_Key
Keystone Fund Projects by County (1994-‐2013)
Page 368 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Luzerne Pittston City Comprehensive, Recreation, Park and Open-‐Space Plan
BRC-‐TAG-‐12-‐258
$12,000 $12,000 12 Comp. Rec., Park, & Open Space Plans (COMM)
$24,000 COMM_Key
Luzerne Pittston City Duryea to Wilkes-‐Barre Master Plan
KEY-‐RTP-‐4-‐16
$24,000 $24,000 4 Master Plans (RT)
$48,000 RT_Key
Luzerne Pittston City Peer-‐to-‐Peer KEY-‐TAG-‐3-‐3
$7,500 $7,500 3 Peer-‐to-‐Peer Tech. Assistance (COMM)
$8,250 COMM_Key
Luzerne Pittston City Riverfront Park KEY-‐PRD-‐3-‐175
$200,000 $200,000 3 Park Rehabilitation and Development (COMM)
$425,000 COMM_Key
Luzerne Plains Township Municipal Park BRC-‐PRD-‐6-‐152
$25,000 $25,000 6 Park Rehabilitation and Development (COMM)
$50,000 COMM_Key
Luzerne Plains Township Municipal Park KEY-‐PRD-‐2-‐127
$45,000 $45,000 2 Park Rehabilitation and Development (COMM)
$90,000 COMM_Key
Luzerne Plains Township Municipal Park KEY-‐PRD-‐3-‐176
$27,500 $27,500 3 Park Rehabilitation and Development (COMM)
$55,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 369 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Luzerne Rice Township Wapwallopen Creek Greenway FS/MP
BRC-‐TAG-‐9-‐175
$35,000 $25,000 9 Feasibility Studies (COMM)
$70,000 COMM_Key
Luzerne Shickshinny Borough Borough Playground Renovation
BRC-‐SC-‐11-‐154
$40,000 $40,000 11 Small Communities/Small Projects (COMM)
$68,000 COMM_Key
Luzerne Shickshinny Borough Crary Park BRC-‐PRD-‐14-‐170
$166,000 $156,000 14 Park Rehabilitation and Development (COMM)
$440,400 COMM_Key
Luzerne Sugarloaf Township Joe LaRock Recreation Complex
BRC-‐SC-‐10-‐99
$39,800 $34,000 10 Small Communities/Small Projects (COMM)
$65,900 COMM_Key
Luzerne Susquehanna Warrior Trail Council
Susquehanna Warrior Trail
BRC-‐RTD-‐6-‐20
$748,990 $36,000 6 Rail Rehabilitation and Development (RT)
$1,497,980 RT_Key
Luzerne The Conservation Fund
Theta Lands: Phase II
BRC-‐LTA-‐11-‐1
$1,100,000 $1,100,000 11 Open Space Acquisition (LT)
$2,800,000 LT_Key
Luzerne The Nature Conservancy
Arbutus/Basler Acquisition
BRC-‐LTA-‐16-‐38
$1,075,400 $643,000 16 Open Space Acquisition (LT)
$2,150,800 LT_Key
Luzerne Tri-‐Area Joint Recreation Authority
Peer-‐to-‐Peer KEY-‐TAG-‐6-‐3
$7,500 $7,500 6 Peer-‐to-‐Peer Tech. Assistance (COMM)
$8,250 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 370 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Luzerne West Hazleton Borough
West Hazleton Sports Complex
KEY-‐SC-‐2-‐171
$20,000 $20,000 2 Small Communities/Small Projects (COMM)
$22,748 COMM_Key
Luzerne West Pittston Borough
Morris Park BRC-‐PRD-‐10-‐143
$42,300 $42,000 10 Park Rehabilitation and Development (COMM)
$84,500 COMM_Key
Luzerne West Pittston Borough
Pool Feasibility Study BRC-‐TAG-‐12-‐264
$12,500 $12,500 12 Feasibility Studies (COMM)
$25,000 COMM_Key
Luzerne West Wyoming Borough
Charney Park -‐ Development
BRC-‐SC-‐17-‐51
$40,000 $40,000 17 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Luzerne West Wyoming Borough
Shoemaker Avenue Park
BRC-‐SC-‐6-‐198
$20,000 $20,000 6 Small Communities/Small Projects (COMM)
$20,600 COMM_Key
Luzerne West Wyoming Borough
West Side Trail -‐ Phase 1B
BRC-‐PRD-‐14-‐184
$172,000 $172,000 14 Park Rehabilitation and Development (COMM)
$1,318,300 COMM_Key
Luzerne White Haven Borough
Borough Park KEY-‐SC-‐3-‐241
$20,000 $20,000 3 Small Communities/Small Projects (COMM)
$22,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 371 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Luzerne White Haven Borough Hemlock Street Park- Development
BRC-SC-19-54
$30,000.00 $30,000.00 19 Small Communities/Small Projects (COMM)
$40,000.00 COMM_Key
Luzerne White Haven Borough Hemlock Street Park- Development
BRC-SC-19-54
$30,000.00 $30,000.00 19 Small Communities/Small Projects (COMM)
$40,000.00 COMM_Key
Luzerne White Haven Borough Hemlock Street Park- Development
BRC-SC-19-54
$30,000.00 $30,000.00 19 Small Communities/Small Projects (COMM)
$40,000.00 COMM_Key
Luzerne White Haven Borough
Lehigh Park-‐Restroom Construction
BRC-‐SC-‐8-‐217
$22,000 $22,000 8 Small Communities/Small Projects (COMM)
$32,400 COMM_Key
Luzerne White Haven Borough
Mini Plan BRC-‐TAG-‐11.5-‐36
$10,000 $10,000 11.5 Comp. Rec., Park, & Open Space Plans (COMM)
$20,000 COMM_Key
Luzerne White Haven Borough
Pine Street Park BRC-‐SC-‐13-‐83
$24,000 $24,000 13 Small Communities/Small Projects (COMM)
$30,100 COMM_Key
Luzerne Wildlands Conservancy, Inc.
Bear Creek Plan KEY-‐LTP-‐4-‐24
$25,000 $25,000 4 Open Space Planning (LT)
$57,500 LT_Key
Luzerne Wildlands Conservancy, Inc.
Haystack Mountain Tract
KEY-‐LTA-‐3-‐24
$257,175 $240,000 3 Critical Habitat Acquisition (LT)
$500,000 LT_Key
Luzerne Wildlands Conservancy, Inc.
Little Nescopeck Creek Watershed Plan
KEY-‐RCP-‐95-‐04
$50,000 $50,000 1 Planning (RIV) $121,600 RIVER_Key
Keystone Fund Projects by County (1994-‐2013)
Page 372 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Luzerne Wildlands Conservancy, Inc.
Monocacy Creek Watershed Cons. Plan
KEY-‐RCP-‐95-‐09
$50,000 $50,000 1 Planning (RIV) $115,100 RIVER_Key
Luzerne Wilkes-‐Barre City Four Sites KEY-‐PRD-‐2-‐177
$125,000 $125,000 2 Park Rehabilitation and Development (COMM)
$250,000 COMM_Key
Luzerne Wilkes-‐Barre City Greenway and Trail Master Plan
BRC-‐TAG-‐12-‐265
$33,100 $30,000 12 Greenway Plans (COMM)
$68,400 COMM_Key
Luzerne Wright Township Recreation Park BRC-‐PRD-‐13-‐453
$600,000 $220,000 13 Park Rehabilitation and Development (COMM)
$1,200,000 COMM_Key
Luzerne Wright Township Township Park KEY-‐SC-‐3-‐244
$20,000 $20,000 3 Small Communities/Small Projects (COMM)
$28,000 COMM_Key
Luzerne Wyoming Borough Butler Street Park BRC-‐SC-‐6-‐204
$20,000 $20,000 6 Small Communities/Small Projects (COMM)
$23,600 COMM_Key
Luzerne, Pike Lehman Township Back Mountain Recreation Complex
BRC-‐TAG-‐7-‐2
$7,500 $7,500 7 Peer-‐to-‐Peer Tech. Assistance (COMM)
$8,250 COMM_Key
Lycoming Clinton Township Rodgers Park KEY-‐SC-‐5-‐35 $7,062 $7,100 5 Small Communities/Small Projects (COMM)
$9,586 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 373 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lycoming East Lycoming Recreation Authority
Lime Bluff Recreation Area -‐ Phase III
BRC-‐PRD-‐8-‐60
$75,000 $75,000 8 Park Rehabilitation and Development (COMM)
$155,600 COMM_Key
Lycoming East Lycoming Recreation Authority
Lime Bluff Recreation Area
BRC-‐PRD-‐7-‐59
$41,900 $42,000 7 Park Rehabilitation and Development (COMM)
$92,940 COMM_Key
Lycoming East Lycoming Recreation Authority
Lime Bluff Recreation Area
KEY-‐PRD-‐5-‐57
$140,628 $140,600 5 Park Rehabilitation and Development (COMM)
$281,628 COMM_Key
Lycoming Hughesville Borough Bodine Park KEY-‐SC-‐3-‐94 $10,000 $10,000 3 Small Communities/Small Projects (COMM)
$18,000 COMM_Key
Lycoming Jersey Shore Borough
Community Pool BRC-‐PRD-‐9-‐102
$265,500 $200,000 9 Park Rehabilitation and Development (COMM)
$531,300 COMM_Key
Lycoming Jersey Shore Borough
Community Pool Renovations -‐ Phase I
BRC-‐TAG-‐8-‐96
$200,000 $10,000 8 Feasibility Studies (COMM)
$405,600 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 374 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lycoming Jersey Shore Borough
Jersey Shore Boat Launch
BRC-‐PRD-‐18-‐75
$205,770 $205,700 18 Park Rehabilitation and Development (COMM)
$411,556 COMM_Key
Lycoming Jersey Shore Borough
Jersey Shore Pine Creek Trail Connector
BRC-‐PRD-‐14-‐296
$355,000 $25,500 14 Park Rehabilitation and Development (COMM)
$1,273,600 COMM_Key
Lycoming Jersey Shore Borough
Jersey Shore Riverwalk/Boardwalk
BRC-‐RCI-‐10-‐4
$12,100 $37,500 10 Implementation (RIV)
$75,000 RIVER_Key
Lycoming Lewis Township Trout Run Park -‐ Development
BRC-‐SC-‐17-‐43
$40,000 $40,000 17 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Lycoming Loyalsock Township Bruce E. Henry Park Renovation
BRC-‐PRD-‐11-‐52
$120,000 $120,000 11 Park Rehabilitation and Development (COMM)
$240,000 COMM_Key
Lycoming Loyalsock Township Bull Run Park KEY-‐ACQ-‐1-‐76
$18,000 $18,000 1 Acquisition (COMM)
$40,000 COMM_Key
Lycoming Loyalsock Township Community Pool Renovations
BRC-‐PRD-‐6-‐100
$90,000 $90,000 6 Park Rehabilitation and Development (COMM)
$199,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 375 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lycoming Loyalsock Township James E. Short Park BRC-‐PRD-‐9-‐124
$49,800 $49,000 9 Park Rehabilitation and Development (COMM)
$99,600 COMM_Key
Lycoming Loyalsock Township Loyalsock Riverfront Park Trail -‐ Phase 2 -‐ Development
BRC-‐PRT-‐17-‐74
$174,637 $74,600 17 Development and Rehabilitation
$218,296 COMM_Key
Lycoming Loyalsock Township Master Site Development Plan
KEY-‐TAG-‐3-‐122
$13,400 $13,400 3 Master Site Plans (COMM)
$29,700 COMM_Key
Lycoming Loyalsock Township Millers Run Greenway
BRC-‐TAG-‐18-‐142
$18,500 $18,500 18 Greenway Plans (COMM)
$37,000 COMM_Key
Lycoming Loyalsock Township Riverfront Park KEY-‐ACQ-‐2-‐89
$131,558 $100,000 2 Acquisition (COMM)
$226,116 COMM_Key
Lycoming Loyalsock Township Riverfront Park KEY-‐PRD-‐5-‐118
$65,000 $65,000 5 Park Rehabilitation and Development (COMM)
$133,900 COMM_Key
Lycoming Lycoming County Comprehensive Recreation, Park & Open Space Plan
KEY-‐TAG-‐5-‐120
$30,000 $80,000 5 Comp. Rec., Park, & Open Space Plans (COMM)
$160,000 COMM_Key
Lycoming Lycoming County Susquehanna Riverwalk
BRC-‐PRD-‐13-‐121
$184,000 $184,000 13 Park Rehabilitation and Development (COMM)
$920,400 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 376 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lycoming Lycoming County Susquehanna Riverwalk -‐ Phase II
BRC-‐PRD-‐13.3-‐391
$229,400 $229,400 13.3 Park Rehabilitation and Development (COMM)
$1,147,000 COMM_Key
Lycoming McIntyre Township Ralston Playground BRC-‐SC-‐8-‐116
$30,000 $30,000 8 Small Communities/Small Projects (COMM)
$40,000 COMM_Key
Lycoming Mifflin Township Community Park Master Plan
KEY-‐TAG-‐5-‐131
$5,200 $5,200 5 Master Site Plans (COMM)
$10,400 COMM_Key
Lycoming Mifflin Township Mifflin Township Park -‐ Phase II
BRC-‐PRD-‐13-‐123
$60,000 $60,000 13 Park Rehabilitation and Development (COMM)
$120,000 COMM_Key
Lycoming Mifflin Township Mifflin Township Park- Phase 3- Development
BRC-PRD-19-97
$43,500.00 $43,500.00 19 Park Rehabilitation and Development (COMM)
$87,000.00 COMM_Key
Lycoming Mifflin Township Mifflin Township Park- Phase 3- Development
BRC-PRD-19-97
$43,500.00 $43,500.00 19 Park Rehabilitation and Development (COMM)
$87,000.00 COMM_Key
Lycoming Mifflin Township Mifflin Township Park- Phase 3- Development
BRC-PRD-19-97
$43,500.00 $43,500.00 19 Park Rehabilitation and Development (COMM)
$87,000.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 377 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lycoming Mifflin Township Township Park BRC-‐PRD-‐7-‐129
$37,435 $30,000 7 Park Rehabilitation and Development (COMM)
$75,440 COMM_Key
Lycoming Montgomery Borough
Heritage Park Phase II
KEY-‐SC-‐2-‐105
$20,000 $20,000 2 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Lycoming Montgomery Borough
Montgomery Park BRC-‐SC-‐7-‐132
$20,000 $20,000 7 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Lycoming Montgomery Borough
Skateboard Park BRC-‐SC-‐9-‐139
$40,000 $40,000 9 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Lycoming Montoursville Borough
Indian Park KEY-‐SC-‐4-‐106
$9,200 $9,200 4 Small Communities/Small Projects (COMM)
$15,000 COMM_Key
Lycoming Montoursville Borough
Pool Feasibility Study BRC-‐TAG-‐10-‐160
$6,500 $6,500 10 Feasibility Studies (COMM)
$13,000 COMM_Key
Lycoming Muncy Borough Muncy Trail Network Plan
BRC-‐TAG-‐14-‐222
$22,500 $22,500 14 Trail Study (COMM)
$45,000 COMM_Key
Lycoming Muncy Creek Township
Heritage Park and Nature Trail
BRC-‐PRD-‐14-‐156
$50,000 $50,000 14 Park Rehabilitation and Development (COMM)
$183,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 378 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lycoming Muncy Creek Township
Kiess Memorial Park KEY-‐SC-‐4-‐109
$10,700 $11,000 4 Small Communities/Small Projects (COMM)
$21,100 COMM_Key
Lycoming Muncy Creek Township
Muncy Canal Heritage Park and Nature Trail
BRC-‐TAG-‐12-‐280
$20,000 $20,000 12 Master Site Plans (COMM)
$55,000 COMM_Key
Lycoming Northcentral Pennsylvania Conservancy
Thompson Tract BRC-‐LTA-‐6-‐26
$394,500 $200,000 6 Open Space Acquisition (LT)
$789,000 LT_Key
Lycoming Old Lycoming Township
Two Sites BRC-‐PRD-‐6-‐133
$75,000 $75,000 6 Park Rehabilitation and Development (COMM)
$150,000 COMM_Key
Lycoming Picture Rocks Borough
Picture Rocks Park (aka Van Rensselaer Park)
BRC-‐SC-‐14-‐101
$35,000 $35,000 14 Small Communities/Small Projects (COMM)
$45,000 COMM_Key
Lycoming Pine Creek Council of Governments
Pine Creek PA Wilds Early Action Initiatives
BRC-‐TAG-‐12.5-‐4
$77,700 $54,000 12.5 Conservation/Sound Land Use (COMM)
$155,400 COMM_Key
Lycoming South Williamsport Borough
Susquehanna River Walk Extension
BRC-‐PRD-‐11-‐82
$55,200 $55,200 11 Park Rehabilitation and Development (COMM)
$372,800 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 379 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lycoming South Williamsport Borough
Swimming Pool BRC-‐PRD-‐9-‐195
$275,000 $200,000 9 Park Rehabilitation and Development (COMM)
$555,000 COMM_Key
Lycoming South Williamsport Borough
Three Sites KEY-‐PRD-‐2-‐145
$59,040 $50,000 2 Park Rehabilitation and Development (COMM)
$131,200 COMM_Key
Lycoming Williamsport City Lose School and Young's Woods Parks
BRC-‐PRD-‐13-‐156
$250,000 $250,000 13 Park Rehabilitation and Development (COMM)
$504,900 COMM_Key
Lycoming Williamsport City Memorial Park KEY-‐PRD-‐4-‐177
$77,800 $78,000 4 Park Rehabilitation and Development (COMM)
$155,600 COMM_Key
Lycoming Williamsport City Newberry Park BRC-‐PRD-‐13.3-‐449
$321,500 $200,000 13.3 Park Rehabilitation and Development (COMM)
$643,000 COMM_Key
Lycoming Williamsport City Newberry Park KEY-‐PRD-‐1-‐150
$29,000 $29,000 1 Park Rehabilitation and Development (COMM)
$80,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 380 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Lycoming Williamsport City Park Master Plans BRC-‐TAG-‐11.5-‐39
$35,000 $35,000 11.5 Master Site Plans (COMM)
$70,000 COMM_Key
Lycoming Williamsport City Peer to Peer BRC-‐TAG-‐10-‐174
$10,000 $11,000 10 Peer-‐to-‐Peer Tech. Assistance (COMM)
$11,000 COMM_Key
Lycoming Williamsport City Shaw Place Park-‐ Development
BRC-‐PRD-‐18-‐105
$250,000 $250,000 18 Park Rehabilitation and Development (COMM)
$500,500 COMM_Key
Lycoming Williamsport City Williamsport Pool Feasibility Study
BRC-‐TAG-‐13.6-‐606
$20,000 $20,000 13.6 Feasibility Studies (COMM)
$40,000 COMM_Key
McKean Bradford City Callahan Park BRC-‐PRD-‐13.3-‐340
$60,000 $60,000 13.3 Park Rehabilitation and Development (COMM)
$120,000 COMM_Key
McKean Bradford City Callahan Park KEY-‐ACQ-‐4-‐17
$31,000 $30,000 4 Acquisition (COMM)
$62,000 COMM_Key
McKean Bradford City Callahan Park KEY-‐PRD-‐2-‐15
$81,500 $81,500 2 Park Rehabilitation and Development (COMM)
$163,000 COMM_Key
McKean Bradford City Callahan Park Ice Rink
KEY-‐PRD-‐5-‐20
$50,000 $50,000 5 Park Rehabilitation and Development (COMM)
$325,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 381 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
McKean Bradford City Callahan Park Improvements
KEY-‐PRD-‐1-‐16
$150,000 $100,000 1 Park Rehabilitation and Development (COMM)
$350,000 COMM_Key
McKean Bradford City Community Parks Trail
BRC-‐PRD-‐14-‐117
$175,000 $175,000 14 Park Rehabilitation and Development (COMM)
$1,442,300 COMM_Key
McKean Bradford City Poplin Avenue Athletic Field
BRC-‐PRD-‐9-‐27
$100,000 $100,000 9 Park Rehabilitation and Development (COMM)
$215,000 COMM_Key
McKean Bradford Township Marilla Reservoir Trail
BRC-‐PRD-‐9-‐30
$150,000 $150,000 9 Park Rehabilitation and Development (COMM)
$370,000 COMM_Key
McKean Eldred Borough Eldred Memorial Park
KEY-‐SC-‐5-‐59 $20,000 $20,000 5 Small Communities/Small Projects (COMM)
$20,904 COMM_Key
McKean Foster Township Foster Township Recreational Area
BRC-‐PRD-‐7-‐77
$58,907 $53,300 7 Park Rehabilitation and Development (COMM)
$117,815 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 382 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
McKean Kane Borough Glenwood Park KEY-‐SC-‐4-‐74 $20,000 $20,000 4 Small Communities/Small Projects (COMM)
$25,000 COMM_Key
McKean Kane Borough Glenwood Park KEY-‐SC-‐5-‐102
$20,000 $20,000 5 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
McKean Keating Township Hilltop Community Park
BRC-‐SC-‐9-‐107
$20,000 $21,000 9 Small Communities/Small Projects (COMM)
$29,800 COMM_Key
McKean Kinzua Valley Trail Club
Kinzua Valley Trail BRC-‐RTD-‐8-‐9
$63,700 $40,000 8 Rail Rehabilitation and Development (RT)
$152,000 RT_Key
McKean Lafayette Township Township Playground
BRC-‐SC-‐13.3-‐309
$19,600 $20,000 13.3 Small Communities/Small Projects (COMM)
$19,600 COMM_Key
McKean Lewis Run Borough Borough Park KEY-‐SC-‐5-‐111
$20,000 $20,000 5 Small Communities/Small Projects (COMM)
$27,139 COMM_Key
McKean Lewis Run Borough Lewis Run Borough Park
BRC-‐SC-‐8-‐103
$26,000 $26,000 8 Small Communities/Small Projects (COMM)
$32,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 383 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
McKean McKean County Trail Feasibility Study and Master Site Plans
BRC-‐TAG-‐14-‐219
$25,000 $25,000 14 Trail Study (COMM)
$50,000 COMM_Key
McKean Norwich Township Norwich Township Park
BRC-‐SC-‐7-‐144
$32,347 $26,000 7 Small Communities/Small Projects (COMM)
$38,781 COMM_Key
McKean Otto Township Pool Feasiblity Study BRC-‐TAG-‐13.6-‐602
$7,500 $7,500 13.6 Feasibility Studies (COMM)
$15,000 COMM_Key
McKean Smethport Borough Hamlin Park Plan BRC-‐TAG-‐10-‐168
$9,300 $9,300 10 Master Site Plans (COMM)
$18,600 COMM_Key
McKean Tuna Valley Council of Governments
Tuna Valley Trails Greenway Plan
KEY-‐TAG-‐5-‐205
$20,000 $20,000 5 Greenway Plans (COMM)
$40,000 COMM_Key
McKean Tuna Valley Trail Association
South Trail-‐ renamed Blaisdell Emery Trail
BRC-‐RTD-‐11-‐12
$175,000 $175,000 11 Rail Rehabilitation and Development (RT)
$425,300 RT_Key
McKean, Potter
Western Pennsylvania Conservancy
Allegheny River Headwaters Conservation Plan
BRC-‐RCP-‐13.3-‐513
$120,000 $105,000 13.3 Planning (RIV) $240,100 RIVER_Key
Mercer Clark Borough Henderson Taylor Community Park
BRC-‐SC-‐10-‐70
$28,400 $28,400 10 Small Communities/Small Projects (COMM)
$36,800 COMM_Key
Mercer Clark Borough Henderson Taylor Community Park
BRC-‐SC-‐6-‐40
$20,000 $20,000 6 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 384 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Mercer Clark Borough Henderson Taylor Community Park
BRC-‐SC-‐8-‐236
$33,000 $33,000 8 Small Communities/Small Projects (COMM)
$46,000 COMM_Key
Mercer Delaware Township Township Park-‐ Phase I
BRC-‐SC-‐13.3-‐295
$20,000 $20,000 13.3 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Mercer Farrell City Comprehensive Recreation & Park Plan
KEY-‐TAG-‐1-‐48
$206,050 $10,000 1 Comp. Rec., Park, & Open Space Plans (COMM)
$412,100 COMM_Key
Mercer Farrell City SW Gardens & Veteran's Sq. Parks
BRC-‐PRD-‐8-‐69
$17,500 $17,000 8 Park Rehabilitation and Development (COMM)
$35,000 COMM_Key
Mercer Farrell City Veterans Square Park-‐Development
BRC-‐PRD-‐18-‐70
$36,000 $36,000 18 Park Rehabilitation and Development (COMM)
$72,000 COMM_Key
Mercer Greenville Borough Master Site Development Plan
KEY-‐TAG-‐3-‐76
$15,300 $8,100 3 Master Site Plans (COMM)
$30,600 COMM_Key
Mercer Grove City Borough Hunter Farm and Stewart Avenue Playgrounds
BRC-‐PRD-‐6-‐77
$75,000 $75,000 6 Park Rehabilitation and Development (COMM)
$150,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 385 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Mercer Grove City Borough Memorial Park BRC-‐PRD-‐12-‐157
$50,200 $50,000 12 Park Rehabilitation and Development (COMM)
$100,400 COMM_Key
Mercer Grove City Borough Memorial Park KEY-‐PRD-‐2-‐55
$75,000 $75,000 2 Park Rehabilitation and Development (COMM)
$150,000 COMM_Key
Mercer Grove City Borough Memorial Park KEY-‐PRD-‐3-‐77
$68,000 $68,000 3 Park Rehabilitation and Development (COMM)
$143,000 COMM_Key
Mercer Grove City Borough Memorial Park KEY-‐PRD-‐5-‐77
$75,000 $75,000 5 Park Rehabilitation and Development (COMM)
$150,000 COMM_Key
Mercer Grove City Borough Memorial Park -‐ Phase I
KEY-‐PRD-‐1-‐54
$74,000 $74,000 1 Park Rehabilitation and Development (COMM)
$148,000 COMM_Key
Mercer Hempfield Township Community Park BRC-‐SC-‐8-‐84
$35,000 $35,000 8 Small Communities/Small Projects (COMM)
$50,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 386 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Mercer Hermitage City City-‐School Recreation Complex
KEY-‐PRD-‐2-‐61
$85,000 $85,000 2 Park Rehabilitation and Development (COMM)
$170,000 COMM_Key
Mercer Hermitage City Community Recreation Site
KEY-‐ACQ-‐3-‐89
$75,000 $75,000 3 Acquisition (COMM)
$150,000 COMM_Key
Mercer Hermitage City Comprehensive Recreation, Park & Open Space Plan
BRC-‐TAG-‐18-‐140
$25,000 $25,000 18 Comp. Rec., Park, & Open Space Plans (COMM)
$50,000 COMM_Key
Mercer Hermitage City Hermitage Athletic Complex -‐Development
BRC-‐PRD-‐18-‐72
$100,000 $100,000 18 Park Rehabilitation and Development (COMM)
$200,000 COMM_Key
Mercer Hermitage City Linden Point Trail -‐ Phase II
BRC-‐PRD-‐11-‐42
$100,000 $100,000 11 Park Rehabilitation and Development (COMM)
$200,000 COMM_Key
Mercer Hermitage City Master Site Development Plan
KEY-‐TAG-‐3-‐88
$10,000 $10,000 3 Master Site Plans (COMM)
$20,000 COMM_Key
Mercer Hermitage City Rodny White Olympic Park -‐ Phase II
BRC-‐PRD-‐6-‐83
$148,500 $148,500 6 Park Rehabilitation and Development (COMM)
$742,500 COMM_Key
Mercer Hermitage City Whispering Pines Park Master Plan
KEY-‐TAG-‐5-‐86
$17,500 $17,500 5 Master Site Plans (COMM)
$35,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 387 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Mercer Jackson Center Borough
Wesley McAfoose Community Park
BRC-‐SC-‐8-‐91
$25,000 $25,000 8 Small Communities/Small Projects (COMM)
$30,000 COMM_Key
Mercer Jamestown Borough Scipio Street Park KEY-‐SC-‐3-‐97 $15,400 $15,400 3 Small Communities/Small Projects (COMM)
$16,200 COMM_Key
Mercer Jefferson Township Jefferson Twp. Park Master Site Plan
BRC-‐TAG-‐8-‐95
$12,500 $12,500 8 Master Site Plans (COMM)
$25,000 COMM_Key
Mercer Jefferson Township Township Park BRC-‐SC-‐11-‐129
$40,000 $40,000 11 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Mercer Jefferson Township Township Park KEY-‐SC-‐1-‐63 $19,710 $19,700 1 Small Communities/Small Projects (COMM)
$21,360 COMM_Key
Mercer Lackawannock Township
Township Park BRC-‐SC-‐6-‐90
$20,000 $20,000 6 Small Communities/Small Projects (COMM)
$21,470 COMM_Key
Mercer Lake Township Jack Jones Memorial Complex
BRC-‐TAG-‐7-‐96
$13,000 $13,000 7 Master Site Plans (COMM)
$26,074 COMM_Key
Mercer Mercer Borough Brandy Springs Park KEY-‐SC-‐3-‐133
$20,000 $20,000 3 Small Communities/Small Projects (COMM)
$23,026 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 388 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Mercer Mercer Borough Lamar Field KEY-‐SC-‐2-‐97 $20,000 $20,000 2 Small Communities/Small Projects (COMM)
$33,733 COMM_Key
Mercer Mercer County 4-‐H Park KEY-‐PRD-‐5-‐128
$16,000 $16,000 5 Park Rehabilitation and Development (COMM)
$32,000 COMM_Key
Mercer Mercer County Chestnut Run Recreation Area
KEY-‐PRD-‐3-‐134
$50,000 $47,000 3 Park Rehabilitation and Development (COMM)
$100,000 COMM_Key
Mercer Mercer County Chestnut Run Swim Beach
BRC-‐PRD-‐7-‐126
$30,000 $30,000 7 Park Rehabilitation and Development (COMM)
$60,000 COMM_Key
Mercer Mercer County Munnell Run Farm BRC-‐PRD-‐13.3-‐394
$170,100 $170,000 13.3 Park Rehabilitation and Development (COMM)
$344,200 COMM_Key
Mercer Mercer County Housing Authority
Three Sites KEY-‐PRD-‐4-‐101
$97,200 $97,200 4 Park Rehabilitation and Development (COMM)
$194,400 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 389 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Mercer Mercer County Regional Council of Governments
L-‐S-‐WM Community Pool Study
BRC-‐TAG-‐12-‐249
$20,000 $20,000 12 Feasibility Studies (COMM)
$40,000 COMM_Key
Mercer Mercer County Regional Council of Governments
MCRCOG Recreation Circuit Rider, Year 1
KEY-‐TAG-‐4-‐100
$30,000 $30,000 4 Circuit Rider (COMM)
$87,400 COMM_Key
Mercer Mercer County Regional Council of Governments
Shenango Valley Softball Complex
BRC-‐PRD-‐9-‐133
$76,500 $76,000 9 Park Rehabilitation and Development (COMM)
$153,000 COMM_Key
Mercer Mercer County Regional Council of Governments
Swimming Pool and Recreation Complex
BRC-‐PRD-‐7-‐127
$50,000 $50,000 7 Park Rehabilitation and Development (COMM)
$100,000 COMM_Key
Mercer Mercer County Regional Council of Governments
Trout Island Trail BRC-‐PRD-‐8-‐117
$103,000 $103,000 8 Park Rehabilitation and Development (COMM)
$283,000 COMM_Key
Mercer Mercer County Regional Planning Commission County
Greenways, Open Space & Rural Rec. Plan
BRC-‐TAG-‐9-‐132
$22,500 $22,000 9 Comp. Rec., Park, & Open Space Plans (COMM)
$45,000 COMM_Key
Mercer Perry Township Commodore Perry Community Park
KEY-‐SC-‐3-‐169
$19,200 $19,200 3 Small Communities/Small Projects (COMM)
$19,700 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 390 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Mercer Pymatuning Township
Pymatuning Township Park
BRC-‐SC-‐8-‐160
$24,000 $24,000 8 Small Communities/Small Projects (COMM)
$28,000 COMM_Key
Mercer Sandy Lake Borough G. Turner Craig Community Park
KEY-‐SC-‐2-‐136
$20,000 $20,000 2 Small Communities/Small Projects (COMM)
$25,000 COMM_Key
Mercer Sharon City Bicentenial Park Master Site Plan
BRC-‐TAG-‐13-‐206
$10,000 $10,000 13 Master Site Plans (COMM)
$23,100 COMM_Key
Mercer Sharon City Comp. Recreation, Park & Open Space Plan
BRC-‐TAG-‐6-‐164
$15,000 $15,000 6 Comp. Rec., Park, & Open Space Plans (COMM)
$30,000 COMM_Key
Mercer Sharpsville Borough Grandy Acquisition (Erie Canal Lock Park)
BRC-‐ACQ-‐18-‐9
$11,100 $11,000 18 Acquisition (COMM)
$22,200 COMM_Key
Mercer Sharpsville Borough Milliken Avenue Park-‐Development
BRC-‐PRD-‐18-‐98
$152,250 $152,000 18 Park Rehabilitation and Development (COMM)
$304,500 COMM_Key
Mercer Shenango River Watchers, Inc.
Shenango River Water Trail Feasibility Study
BRC-‐RCP-‐13.3-‐493
$11,000 $11,000 13.3 Feasibility Studies (COMM)
$22,000 RIVER_Key
Mercer Shenango Township Community Park BRC-‐SC-‐10-‐96
$40,000 $40,000 10 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 391 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Mercer Shenango Township Township Park KEY-‐SC-‐2-‐139
$20,000 $20,000 2 Small Communities/Small Projects (COMM)
$27,000 COMM_Key
Mercer South Pymatuning Township
McCullough Run Athletic Complex
KEY-‐SC-‐3-‐199
$20,000 $20,000 3 Small Communities/Small Projects (COMM)
$23,650 COMM_Key
Mercer South Pymatuning Township
South Pymatuning Park
BRC-‐SC-‐11-‐157
$40,000 $40,000 11 Small Communities/Small Projects (COMM)
$61,500 COMM_Key
Mercer Stoneboro Borough Skateboard Park BRC-‐SC-‐10-‐98
$40,000 $30,000 10 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Mercer West Middlesex Borough
L-‐S-‐WM Park and Pool Complex
KEY-‐SC-‐2-‐174
$20,000 $20,000 2 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Mercer West Middlesex Borough
Regional Skate Park BRC-‐SC-‐9-‐230
$40,000 $40,000 9 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Mercer Wheatland Borough Beechwood Avenue Playground Development
BRC-‐SC-‐18-‐43
$40,000 $40,000 18 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Mercer Wilmington Township
Community Park Master Plan
BRC-‐TAG-‐12-‐267
$6,000 $6,000 12 Master Site Plans (COMM)
$12,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 392 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Mercer Wolf Creek Township
Wolf Creek Twp. Community Park
BRC-‐SC-‐8-‐222
$29,500 $29,000 8 Small Communities/Small Projects (COMM)
$39,000 COMM_Key
Mifflin Bratton Township Longfellow Playground
BRC-‐SC-‐9-‐31
$25,000 $25,000 9 Small Communities/Small Projects (COMM)
$30,000 COMM_Key
Mifflin Burnham Borough Borough Park KEY-‐SC-‐1-‐24 $20,000 $20,000 1 Small Communities/Small Projects (COMM)
$21,995 COMM_Key
Mifflin Derry Township Playground Renovation
BRC-‐PRD-‐10-‐113
$70,500 $70,000 10 Park Rehabilitation and Development (COMM)
$141,000 COMM_Key
Mifflin Granville Township Community Park BRC-‐PRD-‐10-‐118
$105,300 $100,000 10 Park Rehabilitation and Development (COMM)
$210,600 COMM_Key
Mifflin Granville Township Community Park BRC-‐TAG-‐7-‐79
$7,000 $7,000 7 Master Site Plans (COMM)
$14,000 COMM_Key
Mifflin Granville Township Lockport Area Ballfield
BRC-‐ACQ-‐6-‐74
$17,200 $17,200 6 Acquisition (COMM)
$34,400 COMM_Key
Mifflin Lewistown Borough Kish Riverwalk/Trail BRC-‐PRD-‐8-‐105
$126,500 $110,000 8 Park Rehabilitation and Development (COMM)
$253,200 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 393 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Mifflin Lewistown Borough Rec Park Swimming Pool
BRC-‐PRD-‐14-‐150
$234,800 $195,000 14 Park Rehabilitation and Development (COMM)
$469,700 COMM_Key
Mifflin Lewistown Borough Recreation Park Pool KEY-‐PRD-‐5-‐112
$170,600 $150,000 5 Park Rehabilitation and Development (COMM)
$341,200 COMM_Key
Mifflin Mifflin County Juniata River Boat Launch Development
BRC-RCD-19-159
$125,000.00 $125,000.00 19 Development (RIV)
$250,000.00 COMM_Key
Mifflin Mifflin County Juniata River Boat Launch Development
BRC-RCD-19-159
$125,000.00 $125,000.00 19 Development (RIV)
$250,000.00 COMM_Key
Mifflin Mifflin County Juniata River Boat Launch Development
BRC-RCD-19-159
$125,000.00 $125,000.00 19 Development (RIV)
$250,000.00 COMM_Key
Mifflin Union Township Little Kishacoquillas Restoration
BRC-‐RCA-‐8-‐18
$39,000 $39,000 8 Acquisition (RIV)
$78,000 RIVER_Key
Mifflin Union Township Union Township Playground
BRC-‐SC-‐9-‐212
$30,000 $30,000 9 Small Communities/Small Projects (COMM)
$40,000 COMM_Key
Monroe Barrett Township Chaykosky Land Acquisition
BRC-‐ACQ-‐17-‐88
$193,050 $193,000 17 Acquisition (COMM)
$387,450 COMM_Key
Monroe Barrett Township Riley Tract, Gutherie Tract and Ripkey Tract Acquisition
BRC-‐ACQ-‐13-‐261
$411,500 $411,000 13 Acquisition (COMM)
$858,500 COMM_Key
Monroe Barrett Township Upper Brodhead-‐Paradise Creek Greenway Plan
BRC-‐TAG-‐12.5-‐6
$29,600 $29,000 12.5 Greenway Plans (COMM)
$59,200 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 394 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Monroe Brodhead Watershed Association
Brodhead and Cherry Creek Watershed Cons. Plans
KEY-‐RCP-‐5-‐3
$55,225 $56,000 5 Planning (RIV) $208,700 RIVER_Key
Monroe Brodhead Watershed Association
Inv. Species Mgmt. Plan Brodhead & Cherry Creek Watershed-‐II
BRC-‐RCI-‐13.3-‐506
$22,200 $22,200 13.3 Implementation (RIV)
$46,100 RIVER_Key
Monroe Brodhead Watershed Association
Invasive Species Management Plan
BRC-‐RCI-‐11-‐5
$65,000 $40,000 11 Implementation (RIV)
$156,200 RIVER_Key
Monroe Brodhead Watershed Association
Watershed GIS -‐ Based Study
BRC-‐RCP-‐13-‐9
$58,300 $30,000 13 Planning (RIV) $124,300 RIVER_Key
Monroe Chestnuthill Township
Peer to Peer BRC-‐TAG-‐10-‐13
$10,000 $10,000 10 Peer-‐to-‐Peer Tech. Assistance (COMM)
$11,000 COMM_Key
Monroe Chestnuthill Township
Regional Comprehensive Open Space/Land Use Plan
BRC-‐TAG-‐9-‐47
$25,500 $25,000 9 Conservation/Sound Land Use (COMM)
$100,000 COMM_Key
Monroe Chestnuthill Township
Regional Park Acquisition
BRC-‐ACQ-‐8-‐40
$535,000 $360,000 8 Acquisition (COMM)
$1,070,000 COMM_Key
Monroe Chestnuthill Township
Romascavage Acquisition II
BRC-‐ACQ-‐18-‐5
$140,000 $140,000 18 Acquisition (COMM)
$320,000 COMM_Key
Monroe Chestnuthill Township
Romascavage West End Regional Park MSP
BRC-‐TAG-‐10-‐150
$30,000 $30,000 10 Master Site Plans (COMM)
$60,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 395 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Monroe Chestnuthill Township
Shiffer Acquisition BRC-‐ACQ-‐14-‐50
$235,000 $235,000 14 Acquisition (COMM)
$501,100 COMM_Key
Monroe Chestnuthill Township
Township Park KEY-‐PRD-‐2-‐28
$11,500 $11,500 2 Park Rehabilitation and Development (COMM)
$23,000 COMM_Key
Monroe Coolbaugh Township Hoodak Property Acquisition
BRC-‐ACQ-‐11-‐173
$315,000 $100,000 11 Acquisition (COMM)
$630,000 COMM_Key
Monroe East Stroudsburg Borough
Dansbury Park KEY-‐PRD-‐3-‐56
$18,600 $19,000 3 Park Rehabilitation and Development (COMM)
$37,400 COMM_Key
Monroe East Stroudsburg Borough
Dansbury Trailhead Development
BRC-‐PRD-‐12-‐150
$100,000 $100,000 12 Park Rehabilitation and Development (COMM)
$200,000 COMM_Key
Monroe East Stroudsburg Borough
Levee Loop Trail BRC-‐PRD-‐16-‐129
$37,969 $37,900 16 Park Rehabilitation and Development (COMM)
$75,939 COMM_Key
Monroe East Stroudsburg Borough
Terra Greens Golf Course Acquisition
BRC-‐ACQ-‐11-‐253
$800,000 $200,000 11 Acquisition (COMM)
$4,150,000 COMM_Key
Monroe Eldred Township Mock Park -‐ Development
BRC-‐SC-‐17-‐34
$40,000 $40,000 17 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 396 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Monroe Eldred Township Mock Property Acquisition
BRC-‐ACQ-‐12.5-‐7
$285,150 $280,000 12.5 Acquisition (COMM)
$570,300 COMM_Key
Monroe Eldred Township Municipal Park Master Site Plan
BRC-‐TAG-‐14-‐202
$25,000 $25,000 14 Master Site Plans (COMM)
$50,000 COMM_Key
Monroe Hamilton Jackson Pocono Open Space Commission
HJP Park -‐ Phase I BRC-‐PRD-‐13.3-‐371
$125,000 $125,000 13.3 Park Rehabilitation and Development (COMM)
$280,000 COMM_Key
Monroe Hamilton Township Peer to Peer BRC-‐TAG-‐10-‐14
$7,500 $7,500 10 Peer-‐to-‐Peer Tech. Assistance (COMM)
$8,250 COMM_Key
Monroe Hamilton Township Schimpf Tract KEY-‐ACQ-‐5-‐78
$75,000 $75,000 5 Acquisition (COMM)
$150,000 COMM_Key
Monroe Jackson Township Donofrio Acquisition BRC-‐ACQ-‐15-‐44
$325,128 $225,000 15 Acquisition (COMM)
$985,237 COMM_Key
Monroe Jackson Township Golden Slipper Camp Acquisition
BRC-‐ACQ-‐10-‐185
$516,500 $250,000 10 Acquisition (COMM)
$1,109,600 COMM_Key
Monroe Jackson Township HJP Regional Park BRC-‐PRD-‐13-‐375
$110,000 $110,000 13 Park Rehabilitation and Development (COMM)
$251,800 COMM_Key
Monroe Jackson Township HJP Regional Park Master Site Plan
BRC-‐TAG-‐11-‐212
$30,000 $30,000 11 Master Site Plans (COMM)
$60,000 COMM_Key
Monroe Jackson Township Ray Acquisition BRC-‐ACQ-‐17-‐94
$119,000 $119,000 17 Acquisition (COMM)
$355,000 COMM_Key
Monroe Jackson Township Shaw Acquisition BRC-‐ACQ-‐13.3-‐279
$316,600 $300,000 13.3 Acquisition (COMM)
$1,129,600 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 397 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Monroe Middle Smithfield Township
Community Rec. Area
BRC-‐ACQ-‐6-‐111
$150,000 $125,000 6 Acquisition (COMM)
$300,000 COMM_Key
Monroe Middle Smithfield Township
Cradle of Libery Council Acquisition -‐ (BSA)
BRC-‐ACQ-‐13.3-‐281
$247,500 $244,100 13.3 Acquisition (COMM)
$495,100 COMM_Key
Monroe Middle Smithfield Township
Municipal Park Master Site Plan
BRC-‐TAG-‐13-‐196
$17,500 $17,500 13 Master Site Plans (COMM)
$35,000 COMM_Key
Monroe Monroe County Community Park KEY-‐PRD-‐2-‐104
$95,116 $95,100 2 Park Rehabilitation and Development (COMM)
$190,200 COMM_Key
Monroe Monroe County Comp. Rec., Park and Open Space Plan
BRC-‐TAG-‐17-‐13
$40,000 $40,000 17 Comp. Rec., Park, & Open Space Plans (COMM)
$80,000 COMM_Key
Monroe Monroe County Greenway and Open Space Plans
KEY-‐TAG-‐3-‐140
$59,300 $37,500 3 Greenway Plans (COMM)
$118,600 COMM_Key
Monroe Monroe County Municipal Technical Assistance
BRC-‐TAG-‐11.5-‐26
$50,000 $50,000 11.5 Education and Training (COMM)
$100,000 COMM_Key
Monroe Mount Pocono Borough
Deerfield Oak Street Park
BRC-‐PRD-‐13.3-‐402
$50,000 $50,000 13.3 Park Rehabilitation and Development (COMM)
$100,000 COMM_Key
Monroe Natural Lands Trust, Inc.
Camp Acahela Conservation Easement
BRC-‐LTA-‐13-‐31
$417,200 $400,000 13 Open Space Acquisition (LT)
$986,300 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 398 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Monroe Natural Lands Trust, Inc.
Resica Falls Conservation Easement
BRC-‐LTA-‐10-‐15
$550,000 $500,000 10 Critical Habitat Acquisition (LT)
$1,121,000 LT_Key
Monroe Natural Lands Trust, Inc.
Resica Falls Reservation Phase II
BRC-‐LTA-‐11-‐19
$600,000 $400,000 11 Critical Habitat Acquisition (LT)
$1,249,500 LT_Key
Monroe Paradise Township Echo Property Acquisition
BRC-‐ACQ-‐16-‐26
$1,776,250 $1,400,000 16 Acquisition (COMM)
$4,211,250 COMM_Key
Monroe Paradise Township Knauf Property Acquisition
BRC-‐ACQ-‐12.5-‐8
$150,000 $150,000 12.5 Acquisition (COMM)
$300,000 COMM_Key
Monroe Paradise Township Regional Recreational Land Acquisition
BRC-‐ACQ-‐8-‐145
$380,880 $330,000 8 Acquisition (COMM)
$786,900 COMM_Key
Monroe Pocono Area Recreation Commission
Skywood Park Master Site Plan
BRC-‐TAG-‐12.5-‐9
$15,000 $15,000 12.5 Master Site Plans (COMM)
$30,000 COMM_Key
Monroe Pocono Heritage Land Trust
Cherry Valley Acquisition
BRC-‐LTA-‐8-‐14
$141,000 $100,000 8 Open Space Acquisition (LT)
$282,000 LT_Key
Monroe Pocono Heritage Land Trust
Dewey Acquisition BRC-‐LTA-‐17-‐58
$318,921 $318,000 17 Open Space Acquisition (LT)
$637,842 LT_Key
Monroe Pocono Heritage Land Trust
Henry's Crossing Estates Acquisition
BRC-‐LTA-‐18-‐16
$518,815 $518,000 18 Open Space Acquisition (LT)
$1,037,630 LT_Key
Monroe Pocono Heritage Land Trust
Jonas Mountain (Gower Property)
BRC-‐LTA-‐9-‐20
$126,000 $124,000 9 Critical Habitat Acquisition (LT)
$251,600 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 399 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Monroe Pocono Heritage Land Trust
Walker Fieldstone Farm Acquisition
BRC-‐LTA-‐13.6-‐615
$249,800 $248,000 13.6 Open Space Acquisition (LT)
$499,500 LT_Key
Monroe Pocono Township Mountain View Park BRC-‐PRD-‐13-‐136
$43,000 $43,000 13 Park Rehabilitation and Development (COMM)
$88,000 COMM_Key
Monroe Polk Township Gower Tract Acquisition
BRC-‐ACQ-‐10-‐188
$258,300 $175,000 10 Acquisition (COMM)
$516,600 COMM_Key
Monroe Smithfield Township E. Monroe Regional Acquisition-‐Shawnee Tract
BRC-‐ACQ-‐9-‐191
$403,500 $175,000 9 Acquisition (COMM)
$809,500 COMM_Key
Monroe Smithfield Township Marshall Falls Property Acq.
BRC-‐ACQ-‐12-‐77
$130,000 $130,000 12 Acquisition (COMM)
$260,000 COMM_Key
Monroe Smithfield Township Marshalls Falls Property Master Site Plan
BRC-‐TAG-‐17-‐21
$12,000 $12,000 17 Master Site Plans (COMM)
$24,000 COMM_Key
Monroe Smithfield Township Minisink Park KEY-‐ACQ-‐3-‐196
$50,000 $50,000 3 Acquisition (COMM)
$100,000 COMM_Key
Monroe Smithfield Township Minisink Park -‐ Phase I
KEY-‐PRD-‐4-‐142
$25,000 $25,000 4 Park Rehabilitation and Development (COMM)
$110,000 COMM_Key
Monroe Stroud Region Open Space & Recreation Commission
Glen to Glen Trail Feasibility Study -‐ Planning
BRC-‐TAG-‐17-‐23
$10,000 $10,000 17 Trail Study (COMM)
$20,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 400 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Monroe Stroud Region Open Space & Recreation Commission
Regional Parks Study & Master Plan
BRC-‐TAG-‐12.5-‐10
$25,000 $25,000 12.5 Master Site Plans (COMM)
$50,000 COMM_Key
Monroe Stroud Region Open Space & Recreation Commission
Two Pools BRC-‐PRD-‐13-‐435
$75,000 $75,000 13 Park Rehabilitation and Development (COMM)
$174,900 COMM_Key
Monroe Stroud Township Brodhead Creek Corridor
KEY-‐ACQ-‐3-‐209
$59,000 $59,000 3 Acquisition (COMM)
$119,600 COMM_Key
Monroe Stroud Township Greenway Plan BRC-‐TAG-‐7-‐184
$30,000 $30,000 7 Greenway Plans (COMM)
$60,000 COMM_Key
Monroe Stroud Township HSPS Regional Comp. Land Use Plan
BRC-‐TAG-‐8-‐235
$25,500 $25,000 8 Conservation/Sound Land Use (COMM)
$100,000 COMM_Key
Monroe Stroud Township Master Site Dev. Plan & Greenway Study
KEY-‐TAG-‐2-‐151
$10,000 $10,000 2 Master Site Plans (COMM)
$20,500 COMM_Key
Monroe Stroud Township McMichael Creek KEY-‐ACQ-‐4-‐149
$141,000 $100,000 4 Acquisition (COMM)
$282,000 COMM_Key
Monroe Stroud Township Norton Farm Acquisition
BRC-‐ACQ-‐13.6-‐583
$250,000 $250,000 13.6 Acquisition (COMM)
$701,500 COMM_Key
Monroe Stroud Township Pocono Greenway Pedestrian Bridge -‐ Development
BRC-‐PRT-‐18-‐187
$360,272 $195,028 18 Construction $460,272 COMM_Key
Monroe Stroud Township Regional Comp. Rec., Park & Open Space Plan
KEY-‐TAG-‐5-‐193
$25,000 $25,000 5 Comp. Rec., Park, & Open Space Plans (COMM)
$50,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 401 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Monroe Stroud Township Tott's Gap Trailhead for Appalachian Trail
BRC-‐ACQ-‐7-‐185
$20,274 $20,000 7 Acquisition (COMM)
$40,548 COMM_Key
Monroe Stroudsburg Borough
Circuit Rider BRC-‐TAG-‐10-‐2
$98,668 $98,668 10 Circuit Rider (COMM)
$166,000 COMM_Key
Monroe Stroudsburg Borough
Community Pool KEY-‐PRD-‐5-‐194
$100,000 $100,000 5 Park Rehabilitation and Development (COMM)
$250,000 COMM_Key
Monroe Stroudsburg Borough
Peeney Property Acquisition
BRC-‐ACQ-‐13-‐242
$190,800 $190,800 13 Acquisition (COMM)
$381,600 COMM_Key
Monroe The Nature Conservancy
Bryson Tract Acquisition -‐ (Cranberry Bog)
BRC-‐LTA-‐11-‐25
$340,000 $300,000 11 Open Space Acquisition (LT)
$600,000 LT_Key
Monroe The Nature Conservancy
Cherry Creek Valley Site Conservation Plan
KEY-‐LTP-‐5-‐18
$16,066 $16,000 5 Open Space Planning (LT)
$34,700 LT_Key
Monroe The Nature Conservancy
Lake Mineola Marsh KEY-‐LTA-‐4-‐19
$206,250 $150,000 4 Critical Habitat Acquisition (LT)
$427,500 LT_Key
Monroe The Nature Conservancy
Long Pond/Tunkhannock Creek
KEY-‐LTA-‐1-‐12
$1,000,000 $550,000 1 Critical Habitat Acquisition (LT)
$2,000,000 LT_Key
Monroe The Nature Conservancy
Pocono Till Barrens/Long Pond
KEY-‐LTA-‐5-‐20
$262,000 $255,000 5 Critical Habitat Acquisition (LT)
$524,000 LT_Key
Monroe The Nature Conservancy
Two Mile Run KEY-‐LTA-‐4-‐21
$37,500 $35,000 4 Critical Habitat Acquisition (LT)
$75,000 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 402 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Monroe The Nature Conservancy
Two Mile Run Nature Preserve
KEY-‐LTA-‐1-‐13
$150,000 $150,000 1 Critical Habitat Acquisition (LT)
$300,000 LT_Key
Monroe The Nature Conservancy
Weiss Land Acquisiiton (Tannersville Cranberry Bog)
BRC-LTA-19-29
$309,850.00 $306,700.00 19 Critical Habitat Acquisition (LT)
$619,700.00 LT_Key
Monroe The Nature Conservancy
Weiss Land Acquisiiton (Tannersville Cranberry Bog)
BRC-LTA-19-29
$309,850.00 $306,700.00 19 Critical Habitat Acquisition (LT)
$619,700.00 LT_Key
Monroe The Nature Conservancy
Weiss Land Acquisiiton (Tannersville Cranberry Bog)
BRC-LTA-19-29
$309,850.00 $306,700.00 19 Critical Habitat Acquisition (LT)
$619,700.00 LT_Key
Monroe Tobyhanna Township
Creekview Property Acquisition
BRC-‐ACQ-‐14-‐72
$230,450 $230,000 14 Acquisition (COMM)
$460,900 COMM_Key
Monroe Tobyhanna Township
Peer to Peer BRC-‐TAG-‐13-‐37
$10,000 $10,000 13 Peer-‐to-‐Peer Tech. Assistance (COMM)
$11,000 COMM_Key
Monroe Tobyhanna Township
Two Mile Run KEY-‐ACQ-‐1-‐136
$122,000 $100,000 1 Acquisition (COMM)
$244,000 COMM_Key
Monroe Tunkhannock Township
Community Vision, Strategic Plan
BRC-‐TAG-‐6-‐180
$22,500 $42,500 6 Conservation/Sound Land Use (COMM)
$85,000 COMM_Key
Monroe Tunkhannock Township
Moyer Property and Kim Property Acquisitions
BRC-‐ACQ-‐12-‐274
$320,000 $320,000 12 Acquisition (COMM)
$640,000 COMM_Key
Monroe Tunkhannock Township
Silver Tract Acquisition (Fern Ridge Bog)
BRC-‐ACQ-‐13.6-‐584
$320,000 $260,000 13.6 Acquisition (COMM)
$640,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 403 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Monroe West End Park and Open Space Commission
West End Regional Park-‐Phase 1
BRC-‐PRD-‐16-‐173
$65,000 $65,000 16 Park Rehabilitation and Development (COMM)
$133,055 COMM_Key
Monroe Wildlands Conservancy, Inc.
Haase Property Acquisition
BRC-‐LTA-‐18-‐24
$133,600 $133,500 18 Open Space Acquisition (LT)
$267,200 LT_Key
Monroe Wildlands Conservancy, Inc.
Two Mile Run Nature Preserve
KEY-‐LTA-‐1-‐18
$773,800 $500,000 1 Critical Habitat Acquisition (LT)
$1,300,000 LT_Key
Monroe, Pike Lehman Township Bushkill Village Conservation & Management Plan
BRC-‐TAG-‐16-‐62
$30,000 $30,000 16 Trail Study (COMM)
$190,000 COMM_Key
Montgomery Abington Township Alverthorpe Manor Cultural Park
BRC-‐PRD-‐11-‐3
$223,000 $136,900 11 Park Rehabilitation and Development (COMM)
$446,000 COMM_Key
Montgomery Abington Township Demonstration Trail -‐ Phase I
KEY-‐PRD-‐4-‐4
$114,330 $114,000 4 Park Rehabilitation and Development (COMM)
$228,660 COMM_Key
Montgomery Abington Township Rubicam Avenue Park
KEY-‐PRD-‐1-‐1
$25,750 $25,700 1 Park Rehabilitation and Development (COMM)
$51,500 COMM_Key
Montgomery Bridgeport Borough Schuylkill Riverfront Greenway Trail Plan
BRC-‐TAG-‐11-‐193
$30,000 $30,000 11 Greenway Plans (COMM)
$60,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 404 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Montgomery Cheltenham Township
Curtis Arboretum Conservation and Landscape Management Plan
BRC-‐TAG-‐17-‐5
$20,000 $20,000 17 Conservation/Sound Land Use (COMM)
$40,000 COMM_Key
Montgomery Cheltenham Township
High School Park Master Site Plan
BRC-‐TAG-‐13-‐180
$12,500 $12,500 13 Master Site Plans (COMM)
$25,000 COMM_Key
Montgomery Cheltenham Township
High School Park-‐ Phase 2-‐ Development
BRC-‐PRD-‐18-‐55
$100,000 $100,000 18 Park Rehabilitation and Development (COMM)
$200,000 COMM_Key
Montgomery Cheltenham Township
High School Park-‐Development
BRC-‐PRD-‐15-‐53
$150,000 $125,000 15 Park Rehabilitation and Development (COMM)
$386,196 COMM_Key
Montgomery Cheltenham Township
Richard Wall Park Master Plan
BRC-‐TAG-‐10-‐149
$12,500 $12,500 10 Master Site Plans (COMM)
$25,000 COMM_Key
Montgomery Cheltenham Township Rock Creek Greenway Implementation Project
BRC-RCI-19-156
$100,000.00 $100,000.00 19 Implementation (RIV)
$200,000.00 COMM_Key
Montgomery Cheltenham Township Rock Creek Greenway Implementation Project
BRC-RCI-19-156
$100,000.00 $100,000.00 19 Implementation (RIV)
$200,000.00 COMM_Key
Montgomery Cheltenham Township Rock Creek Greenway Implementation Project
BRC-RCI-19-156
$100,000.00 $100,000.00 19 Implementation (RIV)
$200,000.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 405 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Montgomery Cheltenham Township
Tookany Creek Invasive Species Management
BRC-‐RCD-‐12-‐5
$75,000 $75,000 12 Development (RIV)
$150,000 RIVER_Key
Montgomery Cheltenham Township
Tookany Creek Streambank Restoration & Pedestrian Path
BRC-‐PRD-‐12-‐136
$200,000 $200,000 12 Park Rehabilitation and Development (COMM)
$795,000 COMM_Key
Montgomery Cheltenham Township
Tookany Creek Trail BRC-‐PRD-‐6-‐37
$198,627 $298,000 6 Park Rehabilitation and Development (COMM)
$467,976 COMM_Key
Montgomery Cheltenham Township
Tookany Creek Watershed Plan
KEY-‐RCP-‐5-‐4
$25,000 $25,000 5 Planning (RIV) $76,260 RIVER_Key
Montgomery Collegeville Borough Hunsberger Woods KEY-‐PRD-‐4-‐34
$8,067 $8,000 4 Park Rehabilitation and Development (COMM)
$16,134 COMM_Key
Montgomery Collegeville Borough Main Street Beautification Project
BRC-‐SC-‐11-‐112
$20,000 $20,000 11 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Montgomery East Greenville Borough
Community Park KEY-‐SC-‐4-‐48 $19,800 $19,800 4 Small Communities/Small Projects (COMM)
$19,800 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 406 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Montgomery Franconia Township Forest Meadow Park -‐ Phase 1 Development
BRC-‐PRD-‐12-‐154
$121,100 $121,000 12 Park Rehabilitation and Development (COMM)
$272,000 COMM_Key
Montgomery Franconia Township Forrest Meadow Park
BRC-‐TAG-‐6-‐69
$20,000 $20,000 6 Master Site Plans (COMM)
$40,000 COMM_Key
Montgomery Hatboro Borough Peer-‐to-‐Peer BRC-‐TAG-‐10-‐8
$7,500 $7,500 10 Peer-‐to-‐Peer Tech. Assistance (COMM)
$8,250 COMM_Key
Montgomery Hatfield Borough Chestnut Street Trail BRC-‐SC-‐13.3-‐304
$20,000 $20,000 13.3 Small Communities/Small Projects (COMM)
$23,000 COMM_Key
Montgomery Hatfield Borough Liberty Bell Trail KEY-‐RTD-‐5-‐25
$25,000 $25,000 5 Rail Rehabilitation and Development (RT)
$50,000 RT_Key
Montgomery Hatfield Township Chestnut Street Trail -‐ Central Section Development
BRC-‐PRD-‐12-‐158
$100,000 $100,000 12 Park Rehabilitation and Development (COMM)
$200,000 COMM_Key
Montgomery Hatfield Township Greenway and Trails Network Master Plan
BRC-‐RTP-‐12.5-‐1
$20,000 $20,000 12.5 Trail Study (COMM)
$40,000 RT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 407 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Montgomery Hatfield Township Hatfield Community Park
KEY-‐PRD-‐5-‐84
$86,673 $76,600 5 Park Rehabilitation and Development (COMM)
$173,345 COMM_Key
Montgomery Hatfield Township Kratz Property Acquisition
BRC-‐ACQ-‐14-‐59
$229,000 $229,000 14 Acquisition (COMM)
$458,000 COMM_Key
Montgomery Hatfield Township Pool Feasibility Study BRC-‐TAG-‐8-‐82
$9,000 $9,000 8 Feasibility Studies (COMM)
$18,000 COMM_Key
Montgomery Hatfield Township School Road Park KEY-‐PRD-‐1-‐58
$70,697 $70,600 1 Park Rehabilitation and Development (COMM)
$141,394 COMM_Key
Montgomery Hatfield Township School Road Park -‐ Development
BRC-‐PRD-‐17-‐123
$138,000 $138,000 17 Park Rehabilitation and Development (COMM)
$276,000 COMM_Key
Montgomery Horsham Township Cedar Hill Road Park -‐ Phase I
KEY-‐PRD-‐4-‐66
$100,000 $75,000 4 Park Rehabilitation and Development (COMM)
$265,800 COMM_Key
Montgomery Horsham Township Comp and Rec Plan Update
BRC-‐TAG-‐7-‐86
$17,500 $10,000 7 Comp. Rec., Park, & Open Space Plans (COMM)
$35,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 408 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Montgomery Horsham Township Everybody's Playground and Picnic Area
BRC-‐PRD-‐9-‐97
$100,000 $40,000 9 Park Rehabilitation and Development (COMM)
$240,300 COMM_Key
Montgomery Horsham Township Kohler Park -‐ Development
BRC-‐PRD-‐17-‐124
$150,000 $144,500 17 Park Rehabilitation and Development (COMM)
$300,000 COMM_Key
Montgomery Horsham Township Kohler Park Master Site Plan
BRC-‐TAG-‐13.3-‐474
$25,000 $25,000 13.3 Master Site Plans (COMM)
$50,000 COMM_Key
Montgomery Horsham Township Master Site Development Plan
KEY-‐TAG-‐2-‐64
$10,500 $10,500 2 Master Site Plans (COMM)
$21,000 COMM_Key
Montgomery Lansdale Borough Fourth Street Swimming Pool
KEY-‐PRD-‐5-‐107
$300,000 $100,000 5 Park Rehabilitation and Development (COMM)
$600,000 COMM_Key
Montgomery Lansdale Borough Swimming Pool Feasibility Study
KEY-‐TAG-‐2-‐75
$7,500 $7,500 2 Feasibility Studies (COMM)
$15,000 COMM_Key
Montgomery Lansdale Borough White's Road Park KEY-‐PRD-‐1-‐70
$37,750 $37,700 1 Park Rehabilitation and Development (COMM)
$75,500 COMM_Key
Montgomery Lansdale Borough Wissahickon Creek-‐Infiltration Basin & Riparian Buffer
BRC-‐RCD-‐12-‐8
$223,700 $223,000 12 Development (RIV)
$447,400 RIVER_Key
Keystone Fund Projects by County (1994-‐2013)
Page 409 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Montgomery Limerick Township Greenways and Trails NetworkPlan
BRC-‐TAG-‐17-‐11
$25,000 $25,000 17 Greenway Plans (COMM)
$50,000 COMM_Key
Montgomery Limerick Township Kurylo Acquisition BRC-‐ACQ-‐13.3-‐577
$1,252,100 $1,250,000 13.3 Acquisition (COMM)
$3,183,800 COMM_Key
Montgomery Limerick Township Limerick Community Park
KEY-‐PRD-‐5-‐113
$52,000 $52,000 5 Park Rehabilitation and Development (COMM)
$104,000 COMM_Key
Montgomery Limerick Township Master Site Development Plan
KEY-‐TAG-‐3-‐115
$15,000 $15,000 3 Master Site Plans (COMM)
$30,000 COMM_Key
Montgomery Lower Frederick Township
Peer to Peer BRC-‐TAG-‐10-‐3
$7,500 $7,500 10 Peer-‐to-‐Peer Tech. Assistance (COMM)
$8,250 COMM_Key
Montgomery Lower Frederick Township
Township Park KEY-‐SC-‐5-‐114
$20,000 $20,000 5 Small Communities/Small Projects (COMM)
$23,300 COMM_Key
Montgomery Lower Gwynedd Township
Circuit Rider-‐Year 1 KEY-‐TAG-‐4-‐88
$35,000 $35,000 4 Circuit Rider (COMM)
$35,000 COMM_Key
Montgomery Lower Gwynedd Township
Henkel Property Master Plan
BRC-‐TAG-‐6-‐97
$12,500 $12,500 6 Master Site Plans (COMM)
$25,000 COMM_Key
Montgomery Lower Gwynedd Township
Penllyn Woods-‐Phase I
KEY-‐PRD-‐2-‐86
$100,000 $100,000 2 Park Rehabilitation and Development (COMM)
$489,633 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 410 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Montgomery Lower Gwynedd Township
Penn Ambler Park BRC-‐PRD-‐10-‐194
$200,000 $200,000 10 Park Rehabilitation and Development (COMM)
$848,500 COMM_Key
Montgomery Lower Merion Township
Comprehensive Recreation, Parks and Open Space Plan (Update)
BRC-‐TAG-‐13-‐191
$40,000 $35,000 13 Comp. Rec., Park, & Open Space Plans (COMM)
$80,000 COMM_Key
Montgomery Lower Merion Township
Flat Rock Park BRC-‐PRD-‐13.3-‐387
$140,000 $140,000 13.3 Park Rehabilitation and Development (COMM)
$280,000 COMM_Key
Montgomery Lower Merion Township
Master Site Development Plan
KEY-‐TAG-‐3-‐118
$11,000 $12,700 3 Master Site Plans (COMM)
$47,400 COMM_Key
Montgomery Lower Merion Township
Master Site Development Plan
KEY-‐TAG-‐3-‐118
$11,000 $11,000 3 Master Site Plans (COMM)
$47,400 COMM_Key
Montgomery Lower Merion Township
Multiple Master Plans
KEY-‐TAG-‐5-‐116
$23,088 $23,000 5 Master Site Plans (COMM)
$46,176 COMM_Key
Montgomery Lower Merion Township
Rolling Hill Park KEY-‐PRD-‐2-‐88
$216,500 $150,000 2 Park Rehabilitation and Development (COMM)
$433,000 COMM_Key
Montgomery Lower Merion Township
Schuylkill River West Trail Feasibility Study
BRC-‐TAG-‐12-‐245
$46,000 $46,000 12 Trail Study (COMM)
$95,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 411 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Montgomery Lower Merion Township
Shortridge Memorial Park Streambank Stabilization
BRC-‐RCI-‐17-‐168
$115,500 $115,500 17 Implementation (RIV)
$237,525 COMM_Key
Montgomery Lower Merion Township
Trail Feasibility Study BRC-‐TAG-‐7-‐106
$17,500 $17,000 7 Feasibility Studies (COMM)
$35,000 COMM_Key
Montgomery Lower Merion Township
Warner Avenue Playground Plan
BRC-‐TAG-‐11-‐220
$7,300 $7,200 11 Master Site Plans (COMM)
$14,500 COMM_Key
Montgomery Lower Moreland Township
Lower Moreland Recreation Complex - Phase 2 -Development
BRC-PRD-19-93
$149,442.00 $149,000.00 19 Park Rehabilitation and Development (COMM)
$298,885.00 COMM_Key
Montgomery Lower Moreland Township
Lower Moreland Recreation Complex - Phase 2 -Development
BRC-PRD-19-93
$149,442.00 $149,000.00 19 Park Rehabilitation and Development (COMM)
$298,885.00 COMM_Key
Montgomery Lower Moreland Township
Lower Moreland Recreation Complex - Phase 2 -Development
BRC-PRD-19-93
$149,442.00 $149,000.00 19 Park Rehabilitation and Development (COMM)
$298,885.00 COMM_Key
Montgomery Lower Moreland Township
Philmont Avenue Corridor and Greenway Plan
BRC-‐TAG-‐12-‐246
$20,000 $20,000 12 Feasibility Studies (COMM)
$44,400 COMM_Key
Montgomery Lower Pottsgrove Township
Peer-‐to-‐Peer BRC-‐TAG-‐10-‐202
$10,000 $10,000 10 Peer-‐to-‐Peer Tech. Assistance (COMM)
$11,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 412 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Montgomery Lower Pottsgrove Township
Recreation Area KEY-‐PRD-‐1-‐75
$42,291 $42,200 1 Park Rehabilitation and Development (COMM)
$84,582 COMM_Key
Montgomery Lower Pottsgrove Township
Sanatoga Park BRC-‐PRD-‐11-‐51
$127,700 $127,000 11 Park Rehabilitation and Development (COMM)
$255,400 COMM_Key
Montgomery Lower Pottsgrove Township
Sanatoga Park Bandshell
KEY-‐PRD-‐3-‐119
$34,900 $34,900 3 Park Rehabilitation and Development (COMM)
$69,800 COMM_Key
Montgomery Lower Pottsgrove Township
Sanatoga Sports Complex
KEY-‐PRD-‐5-‐117
$70,000 $70,000 5 Park Rehabilitation and Development (COMM)
$140,000 COMM_Key
Montgomery Lower Pottsgrove Township
Snell & Norton/Gerald Richards Park Master Site Plans
BRC-‐TAG-‐13.3-‐478
$39,000 $39,000 13.3 Master Site Plans (COMM)
$78,000 COMM_Key
Montgomery Lower Providence Township
Harry F. Hoy Memorial Park
BRC-‐PRD-‐13-‐119
$95,300 $95,000 13 Park Rehabilitation and Development (COMM)
$190,500 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 413 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Montgomery Lower Providence Township
Harry F. Hoy Memorial Park
BRC-‐PRD-‐6-‐98
$16,205 $16,200 6 Park Rehabilitation and Development (COMM)
$32,410 COMM_Key
Montgomery Lower Salford Township
Multi-‐Use Trail Feasibility Study
BRC-‐TAG-‐18-‐157
$30,512 $30,500 18 Trail Study (COMM)
$61,024 COMM_Key
Montgomery Montgomery County County Park Feasibility Study
KEY-‐TAG-‐4-‐105
$55,000 $40,000 4 Feasibility Studies (COMM)
$110,000 COMM_Key
Montgomery Montgomery County Cross County Trail Feasibility Study
KEY-‐TAG-‐1-‐87
$20,000 $20,000 1 Feasibility Studies (COMM)
$40,000 COMM_Key
Montgomery Montgomery County East Penn Rail Line -‐ Acquisition
BRC-‐RTA-‐17-‐209
$216,473 $216,400 17 Acquisition (RT) $1,082,367 COMM_Key
Montgomery Montgomery County Green Lane Reservoir Park
KEY-‐ACQ-‐3-‐143
$185,900 $100,000 3 Acquisition (COMM)
$371,800 COMM_Key
Montgomery Montgomery County Liberty Bell Trolley Trail Feasibility Study
KEY-‐RTP-‐5-‐9 $30,000 $30,000 5 Feasibility Studies (RT)
$60,000 RT_Key
Montgomery Montgomery County Master Site Development Plan
KEY-‐TAG-‐2-‐106
$60,000 $30,000 2 Master Site Plans (COMM)
$120,000 COMM_Key
Montgomery Montgomery County Natural Areas Inventory Implementation Plan
BRC-‐TAG-‐10-‐195
$50,000 $50,000 10 Natural Areas Inventories (COMM)
$116,200 COMM_Key
Montgomery Montgomery County Open Space System Management Plan
BRC-‐TAG-‐11.5-‐40
$50,000 $50,000 11.5 Conservation/Sound Land Use (COMM)
$100,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 414 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Montgomery Montgomery County Schuylkill Canal Tow Path Restoration/Schuylkill River Trail Extension -‐ Development
BRC-‐PRD-‐17-‐140
$579,420 $325,000 17 Park Rehabilitation and Development (COMM)
$1,158,839 COMM_Key
Montgomery Montgomery County Schuylkill River Trail KEY-‐RTD-‐5-‐10
$40,000 $40,000 5 Rail Rehabilitation and Development (RT)
$80,000 RT_Key
Montgomery Montgomery County Schuylkill River Trail -‐ Pottstown Segment -‐ Development
BRC-‐PRD-‐17-‐75
$199,025 $199,000 17 Park Rehabilitation and Development (COMM)
$398,050 COMM_Key
Montgomery Montgomery County Upper Schuylkill Valley Park -‐ Development
BRC-‐PRD-‐17-‐141
$217,683 $202,000 17 Park Rehabilitation and Development (COMM)
$435,365 COMM_Key
Montgomery Montgomery County Wissahickon Trail Link
BRC-‐PRD-‐5-‐135
$50,000 $50,000 5 Park Rehabilitation and Development (COMM)
$400,000 COMM_Key
Montgomery Montgomery County Lands Trust
Fellowship Farm Conservation Easement
BRC-‐LTA-‐12-‐30
$336,000 $336,000 12 Open Space Acquisition (LT)
$681,800 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 415 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Montgomery Montgomery County Lands Trust
Rogers Property Acquisition
BRC-‐LTA-‐17-‐56
$708,200 $678,000 17 Open Space Acquisition (LT)
$1,416,450 LT_Key
Montgomery Montgomery County Lands Trust
Williams Property Acquisition
BRC-‐LTA-‐11-‐17
$323,400 $285,000 11 Open Space Acquisition (LT)
$654,200 LT_Key
Montgomery Montgomery County Planning Commission County
Sandy Run Creek Conservation Master Plan
KEY-‐RCP-‐96-‐06
$15,000 $15,000 3 Planning (RIV) $30,000 RIVER_Key
Montgomery Montgomery Township
Comprehensive Rec. & Park Plan Update
KEY-‐TAG-‐2-‐107
$8,000 $8,000 2 Comp. Rec., Park, & Open Space Plans (COMM)
$16,000 COMM_Key
Montgomery Montgomery Township
Township Park KEY-‐PRD-‐1-‐88
$18,897 $18,800 1 Park Rehabilitation and Development (COMM)
$37,794 COMM_Key
Montgomery National Audubon Society, Inc.
Audubon Center Conservation Management Plan
BRC-‐LTP-‐12-‐37
$83,500 $83,500 12 Open Space Planning (LT)
$167,100 LT_Key
Montgomery Natural Lands Trust, Inc.
Driscoll Acquisition BRC-‐LTA-‐13.3-‐525
$695,600 $690,000 13.3 Critical Habitat Acquisition (LT)
$2,731,200 LT_Key
Montgomery Natural Lands Trust, Inc.
Musser Scout Reservation
BRC-‐LTA-‐7-‐15
$800,000 $1,125,000 7 Critical Habitat Acquisition (LT)
$2,250,000 LT_Key
Montgomery Natural Lands Trust, Inc.
Unami Hills KEY-‐LTA-‐5-‐9 $616,055 $500,000 5 Critical Habitat Acquisition (LT)
$1,300,000 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 416 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Montgomery Natural Lands Trust, Inc.
Unami Hills Conservation Plan
KEY-‐LTP-‐3-‐12
$14,000 $14,000 3 Critical Habitat Planning (LT)
$35,000 LT_Key
Montgomery New Hanover Township
Community Park KEY-‐PRD-‐5-‐144
$45,000 $45,000 5 Park Rehabilitation and Development (COMM)
$92,000 COMM_Key
Montgomery New Hanover Township
Layfield Park Master Site Plan
BRC-‐TAG-‐11-‐227
$28,000 $28,000 11 Master Site Plans (COMM)
$56,000 COMM_Key
Montgomery Norristown Borough Riverfront Park Master Site Plan
BRC-‐TAG-‐14-‐224
$15,000 $15,000 14 Master Site Plans (COMM)
$30,000 COMM_Key
Montgomery Norristown Borough Simmons Park BRC-‐PRD-‐13.3-‐404
$268,000 $200,000 13.3 Park Rehabilitation and Development (COMM)
$536,000 COMM_Key
Montgomery Norristown Borough Stony Creek and Saw Mill Run Greenways Plan
BRC-‐TAG-‐17-‐16
$25,000 $24,800 17 Greenway Plans (COMM)
$49,792 COMM_Key
Montgomery Norristown Zoological Society
Elmwood Park Zoo-‐Entrance Pavilion Ph II
KEY-‐PRD-‐2-‐112
$200,000 $100,000 2 Park Rehabilitation and Development (COMM)
$400,000 COMM_Key
Montgomery Norristown Zoological Society
Zoo Entrance Pavilion
KEY-‐ZOO-‐94-‐3
$200,000 $200,000 1 Zoo $400,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 417 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Montgomery North Wales Borough
Hess Park BRC-‐PRD-‐13.3-‐406
$136,000 $100,000 13.3 Park Rehabilitation and Development (COMM)
$376,000 COMM_Key
Montgomery North Wales Borough
Hess Park Master Site Plan
BRC-‐TAG-‐11-‐229
$7,500 $7,500 11 Master Site Plans (COMM)
$15,000 COMM_Key
Montgomery North Wales Borough
Wee Walers Park-‐ Development
BRC-‐PRD-‐18-‐87
$20,000 $20,000 18 Park Rehabilitation and Development (COMM)
$115,000 COMM_Key
Montgomery Pennsburg Borough Two Sites KEY-‐SC-‐5-‐158
$19,927 $19,900 5 Small Communities/Small Projects (COMM)
$24,708 COMM_Key
Montgomery Pennypack Ecological Restoration Trust
Bethayres Woods KEY-‐LTA-‐5-‐15
$200,000 $200,000 5 Open Space Acquisition (LT)
$950,000 LT_Key
Montgomery Pennypack Ecological Restoration Trust
Raytharn Farm KEY-‐LTA-‐2-‐13
$500,000 $500,000 2 Open Space Acquisition (LT)
$1,000,000 LT_Key
Montgomery Pennypack Ecological Restoration Trust
Raytharn Farm KEY-‐LTA-‐3-‐19
$750,000 $350,000 3 Open Space Acquisition (LT)
$3,000,000 LT_Key
Montgomery Perkiomen Township Township Park KEY-‐SC-‐3-‐168
$20,000 $20,000 3 Small Communities/Small Projects (COMM)
$52,700 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 418 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Montgomery Perkiomen Valley Watershed Association
Spring Mountain Master Plan
KEY-‐LTP-‐4-‐16
$20,000 $20,000 4 Critical Habitat Planning (LT)
$1,367,400 LT_Key
Montgomery Plymouth Township Harriet Wetherill Park
BRC-‐PRD-‐13.3-‐414
$250,000 $200,000 13.3 Park Rehabilitation and Development (COMM)
$544,100 COMM_Key
Montgomery Plymouth Township Harriet Wetherill Park Conservation and Management Plan
BRC-‐TAG-‐16-‐69
$45,000 $45,000 16 Conservation/Sound Land Use (COMM)
$90,000 COMM_Key
Montgomery Plymouth Township Harriett Wetherill Park Master Plan
BRC-‐TAG-‐11-‐233
$25,100 $25,100 11 Master Site Plans (COMM)
$50,200 COMM_Key
Montgomery Plymouth Township Peer to Peer BRC-‐TAG-‐12-‐271
$10,000 $10,000 12 Peer-‐to-‐Peer Tech. Assistance (COMM)
$11,000 COMM_Key
Montgomery Pottstown Borough Depot Property BRC-‐ACQ-‐6-‐153
$38,500 $38,500 6 Acquisition (COMM)
$77,000 COMM_Key
Montgomery Pottstown Borough Memorial Park Development
BRC-‐PRD-‐12-‐190
$229,000 $229,000 12 Park Rehabilitation and Development (COMM)
$458,000 COMM_Key
Montgomery Pottstown Borough Pedestrain Underpass
BRC-‐PRD-‐10-‐134
$65,000 $65,000 10 Park Rehabilitation and Development (COMM)
$325,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 419 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Montgomery Rockledge Borough Rockledge Avenue Park
BRC-‐SC-‐9-‐177
$20,000 $30,000 9 Small Communities/Small Projects (COMM)
$40,000 COMM_Key
Montgomery Rockledge Borough Two Playgrounds KEY-‐SC-‐1-‐116
$10,007 $10,000 1 Small Communities/Small Projects (COMM)
$12,007 COMM_Key
Montgomery Royersford Borough Riverfront Trail BRC-‐PRD-‐13.3-‐425
$150,000 $100,000 13.3 Park Rehabilitation and Development (COMM)
$300,000 COMM_Key
Montgomery Royersford Borough Royersford Riverfront Trail and Park - Phase 2 - Development
BRC-PRD-19-110
$200,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)
$420,910.00 COMM_Key
Montgomery Royersford Borough Royersford Riverfront Trail and Park - Phase 2 - Development
BRC-PRD-19-110
$200,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)
$420,910.00 COMM_Key
Montgomery Royersford Borough Royersford Riverfront Trail and Park - Phase 2 - Development
BRC-PRD-19-110
$200,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)
$420,910.00 COMM_Key
Montgomery Royersford Borough Victory Park KEY-‐SC-‐1-‐118
$12,000 $12,000 1 Small Communities/Small Projects (COMM)
$12,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 420 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Montgomery Salford Township Barrett Property Acquisition
BRC-‐ACQ-‐12.5-‐20
$105,800 $100,000 12.5 Acquisition (COMM)
$211,700 COMM_Key
Montgomery Salford Township Whites Mill Road Property
KEY-‐ACQ-‐4-‐133
$120,000 $100,000 4 Acquisition (COMM)
$600,000 COMM_Key
Montgomery Schwenksville Borough
Meadow Park -‐ Development
BRC-‐SC-‐17-‐48
$36,327 $36,300 17 Small Communities/Small Projects (COMM)
$52,654 COMM_Key
Montgomery Skippack Township Palmer Park BRC-‐PRD-‐6-‐168
$138,300 $138,300 6 Park Rehabilitation and Development (COMM)
$276,600 COMM_Key
Montgomery Souderton Borough Pool Complex Feasibility Study
BRC-‐TAG-‐9-‐192
$23,500 $23,000 9 Feasibility Studies (COMM)
$47,500 COMM_Key
Montgomery Souderton Borough Souderton Community Pool-‐ Rehabilitation
BRC-‐PRD-‐15-‐69
$250,000 $140,000 15 Park Rehabilitation and Development (COMM)
$1,126,500 COMM_Key
Montgomery Spring-‐Ford Area Council of Governments
Peer-‐to-‐Peer KEY-‐TAG-‐1-‐130
$7,200 $5,000 1 Peer-‐to-‐Peer Tech. Assistance (COMM)
$8,000 COMM_Key
Montgomery Spring-‐Ford Regional Recreation Commission
Circuit Rider -‐ Year 1 KEY-‐TAG-‐2-‐148
$35,000 $35,000 2 Circuit Rider (COMM)
$35,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 421 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Montgomery Spring-‐Ford Regional Recreation Commission
Circuit Rider -‐ Year 2 KEY-‐TAG-‐3-‐203
$27,500 $27,500 3 Circuit Rider (COMM)
$36,700 COMM_Key
Montgomery Springfield Township Comp. Recreation, Park & Open Space Plan
BRC-‐TAG-‐10-‐171
$25,000 $25,000 10 Comp. Rec., Park, & Open Space Plans (COMM)
$50,000 COMM_Key
Montgomery Telford Borough Summit Street Park BRC-‐SC-‐7-‐188
$29,300 $29,000 7 Small Communities/Small Projects (COMM)
$48,580 COMM_Key
Montgomery Towamencin Township
Fischer's Park -‐ Development
BRC-‐PRD-‐17-‐155
$300,000 $300,000 17 Park Rehabilitation and Development (COMM)
$830,000 COMM_Key
Montgomery Towamencin Township
Fischer's Park Master Site Plan
BRC-‐TAG-‐14-‐248
$25,000 $25,000 14 Master Site Plans (COMM)
$50,000 COMM_Key
Montgomery Towamencin Township
Fischer's Park Restoration
BRC-‐PRD-‐7-‐190
$98,507 $98,000 7 Park Rehabilitation and Development (COMM)
$197,015 COMM_Key
Montgomery Towamencin Township
Trail System-‐Phase I KEY-‐PRD-‐2-‐156
$90,270 $80,000 2 Park Rehabilitation and Development (COMM)
$180,541 COMM_Key
Montgomery Trappe Borough Main Street Park Plan
BRC-‐TAG-‐11-‐236
$14,000 $14,000 11 Master Site Plans (COMM)
$30,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 422 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Montgomery Trappe Borough Pollarine Tract BRC-‐ACQ-‐7-‐191
$70,367 $70,000 7 Acquisition (COMM)
$140,734 COMM_Key
Montgomery Trappe Borough Rambo Park - Development
BRC-SC-19-53
$38,105.00 $38,000.00 19 Small Communities/Small Projects (COMM)
$56,210.00 COMM_Key
Montgomery Trappe Borough Rambo Park - Development
BRC-SC-19-53
$38,105.00 $38,000.00 19 Small Communities/Small Projects (COMM)
$56,210.00 COMM_Key
Montgomery Trappe Borough Rambo Park - Development
BRC-SC-19-53
$38,105.00 $38,000.00 19 Small Communities/Small Projects (COMM)
$56,210.00 COMM_Key
Montgomery Trappe Borough Rambo Park Development
BRC-‐PRD-‐12-‐206
$204,500 $200,000 12 Park Rehabilitation and Development (COMM)
$409,000 COMM_Key
Montgomery Trappe Borough Water Works Park KEY-‐PRD-‐5-‐203
$81,350 $81,000 5 Park Rehabilitation and Development (COMM)
$162,700 COMM_Key
Montgomery Upper Dublin Township
Camp Hill & Highland Athletic Field Complex
KEY-‐PRD-‐4-‐155
$150,000 $75,000 4 Park Rehabilitation and Development (COMM)
$550,000 COMM_Key
Montgomery Upper Dublin Township
Twining Valley Land Use Feasibility Study
BRC-TAG-19-146
$30,000.00 $30,000.00 19 Feasibility Studies (COMM)
$60,000.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 423 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Montgomery Upper Dublin Township
Twining Valley Land Use Feasibility Study
BRC-TAG-19-146
$30,000.00 $30,000.00 19 Feasibility Studies (COMM)
$60,000.00 COMM_Key
Montgomery Upper Dublin Township
Twining Valley Land Use Feasibility Study
BRC-TAG-19-146
$30,000.00 $30,000.00 19 Feasibility Studies (COMM)
$60,000.00 COMM_Key
Montgomery Upper Dublin Township
Twining Valley Land Use Feasibility Study
BRC-TAG-19-146
$30,000.00 $30,000.00 19 Feasibility Studies (COMM)
$60,000.00 COMM_Key
Montgomery Upper Frederick Township
Frederick Friendship Park
BRC-‐SC-‐10-‐103
$40,000 $40,000 10 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Montgomery Upper Frederick Township
Township Park KEY-‐SC-‐3-‐223
$19,100 $19,100 3 Small Communities/Small Projects (COMM)
$21,700 COMM_Key
Montgomery Upper Gwynedd Township
Nor-‐Gwyn Recreation Complex-‐Development
BRC-‐PRD-‐16-‐163
$71,500 $71,500 16 Park Rehabilitation and Development (COMM)
$144,921 COMM_Key
Montgomery Upper Hanover Township
Berman Tract Park BRC-‐SC-‐8-‐198
$25,100 $25,000 8 Small Communities/Small Projects (COMM)
$30,200 COMM_Key
Montgomery Upper Hanover Township
Church Road Park BRC-‐PRD-‐13-‐150
$163,400 $163,000 13 Park Rehabilitation and Development (COMM)
$326,900 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 424 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Montgomery Upper Hanover Township
Kistler Bitting YMCA Park
KEY-‐SC-‐5-‐206
$11,000 $11,000 5 Small Communities/Small Projects (COMM)
$22,000 COMM_Key
Montgomery Upper Merion Township
Gulph School Park BRC-‐PRD-‐7-‐197
$50,000 $50,000 7 Park Rehabilitation and Development (COMM)
$150,000 COMM_Key
Montgomery Upper Merion Township
Heuser Park Development
BRC-‐PRD-‐10-‐35
$200,000 $100,000 10 Park Rehabilitation and Development (COMM)
$2,100,000 COMM_Key
Montgomery Upper Merion Township
Schuylkill River West Trail - Reaches 1 & 2 - Development
BRC-PRD-19-121
$106,598.00 $100,000.00 19 Park Rehabilitation and Development (COMM)
$1,406,656.00 COMM_Key
Montgomery Upper Merion Township
Schuylkill River West Trail - Reaches 1 & 2 - Development
BRC-PRD-19-121
$106,598.00 $100,000.00 19 Park Rehabilitation and Development (COMM)
$1,406,656.00 COMM_Key
Montgomery Upper Merion Township
Schuylkill River West Trail - Reaches 1 & 2 - Development
BRC-PRD-19-121
$106,598.00 $100,000.00 19 Park Rehabilitation and Development (COMM)
$1,406,656.00 COMM_Key
Montgomery Upper Pottsgrove Township
Heather Place Park BRC-‐SC-‐6-‐184
$20,000 $20,000 6 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 425 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Montgomery Upper Pottsgrove Township
Hilsee Land Acquisition
BRC-ACQ-19-16
$146,160.00 $146,100.00 19 Acquisition (COMM)
$292,320.00 COMM_Key
Montgomery Upper Pottsgrove Township
Hilsee Land Acquisition
BRC-ACQ-19-16
$146,160.00 $146,100.00 19 Acquisition (COMM)
$292,320.00 COMM_Key
Montgomery Upper Pottsgrove Township
Hilsee Land Acquisition
BRC-ACQ-19-16
$146,160.00 $146,100.00 19 Acquisition (COMM)
$292,320.00 COMM_Key
Montgomery Upper Pottsgrove Township
Mocharniuk Property Acquisition
BRC-‐ACQ-‐8-‐202
$37,500 $37,000 8 Acquisition (COMM)
$80,000 COMM_Key
Montgomery Upper Providence Township
Anderson Farm Park -‐ Phase 1B
BRC-‐PRD-‐14-‐177
$250,000 $200,000 14 Park Rehabilitation and Development (COMM)
$1,748,700 COMM_Key
Montgomery Upper Providence Township
Anderson Farm Park-‐ KEY-‐PRD-‐3-‐225
$150,000 $100,000 3 Park Rehabilitation and Development (COMM)
$477,000 COMM_Key
Montgomery Upper Providence Township
Schuylkill Canal Restoration
BRC-‐RCD-‐8-‐5
$100,000 $100,000 8 Development (RIV)
$395,000 RIVER_Key
Montgomery Upper Salford Township
Rogers-Hiester Stewardship and Trail Plan
BRC-TAG-19-147
$20,000.00 $20,000.00 19 Conservation/Sound Land Use (COMM)
$40,000.00 COMM_Key
Montgomery Upper Salford Township
Rogers-Hiester Stewardship and Trail Plan
BRC-TAG-19-147
$20,000.00 $20,000.00 19 Conservation/Sound Land Use (COMM)
$40,000.00 COMM_Key
Montgomery Upper Salford Township
Rogers-Hiester Stewardship and Trail Plan
BRC-TAG-19-147
$20,000.00 $20,000.00 19 Conservation/Sound Land Use (COMM)
$40,000.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 426 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Montgomery Upper Salford Township
Upper Salford Twp. Park -‐ Ph II
KEY-‐PRD-‐3-‐226
$67,400 $65,000 3 Park Rehabilitation and Development (COMM)
$134,800 COMM_Key
Montgomery Whitemarsh Township
Municipal Greenway & Open Space Network Plan
BRC-‐TAG-‐11-‐239
$27,500 $27,500 11 Greenway Plans (COMM)
$72,000 COMM_Key
Montgomery Whitemarsh Township
WFIL Property KEY-‐ACQ-‐4-‐174
$100,000 $100,000 4 Acquisition (COMM)
$1,236,100 COMM_Key
Montgomery Whitpain Township Whitpain Township Trail Network Plan
BRC-‐TAG-‐14-‐252
$24,300 $32,225 14 Trail Study (COMM)
$48,600 COMM_Key
Montgomery Wissahickon Valley Watershed Association
Armentrout Tract KEY-‐LTA-‐4-‐26
$240,000 $200,000 4 Open Space Acquisition (LT)
$796,000 LT_Key
Montgomery Wissahickon Valley Watershed Association
Cedarbrook Conservation Easement
BRC-LTA-19-34
$45,918.00 $45,000.00 19 Open Space Acquisition (LT)
$93,546.00 LT_Key
Montgomery Wissahickon Valley Watershed Association
Cedarbrook Conservation Easement
BRC-LTA-19-34
$45,918.00 $45,000.00 19 Open Space Acquisition (LT)
$93,546.00 LT_Key
Montgomery Wissahickon Valley Watershed Association
Cedarbrook Conservation Easement
BRC-LTA-19-34
$45,918.00 $45,000.00 19 Open Space Acquisition (LT)
$93,546.00 LT_Key
Montgomery Wissahickon Valley Watershed Association
Cedarbrook Conservation Easement
BRC-LTA-19-34
$45,918.00 $45,000.00 19 Open Space Acquisition (LT)
$93,546.00 LT_Key
Montgomery Wissahickon Valley Watershed Association
Wissahickon Green Preserve
KEY-‐LTA-‐3-‐25
$70,000 $50,000 3 Open Space Acquisition (LT)
$140,000 LT_Key
Montgomery Worcester Township Community Greenway Plan
BRC-‐TAG-‐6-‐202
$17,500 $17,500 6 Greenway Plans (COMM)
$35,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 427 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Montgomery Worcester Township Markel Property BRC-‐ACQ-‐7-‐213
$252,500 $250,000 7 Acquisition (COMM)
$997,500 COMM_Key
Montgomery, Northampton
Ambler Borough Comp. Rec. & Park Plan
BRC-‐TAG-‐8-‐16
$10,400 $10,000 8 Comp. Rec., Park, & Open Space Plans (COMM)
$20,900 COMM_Key
Montgomery, Philadelphia
Lower Merion Township
Manayunk Bridge Multi-‐Use Trail Connector -‐ Development
BRC-‐PRD-‐18-‐84
$500,000 $500,000 18 Park Rehabilitation and Development (COMM)
$2,700,000 COMM_Key
Montgomery, Philadelphia
Philadelphia Water Department
Pennypack River Conservation Plan
BRC-‐RCP-‐8-‐1
$100,000 $100,000 8 Planning (RIV) $235,200 RIVER_Key
Montour Danville Borough Tennis Courts KEY-‐PRD-‐4-‐41
$27,000 $27,000 4 Park Rehabilitation and Development (COMM)
$62,000 COMM_Key
Montour Montour Area Recreation Commission
Danville Area Riverfront and Open Space Master Plan
BRC-‐TAG-‐13.6-‐598
$25,000 $25,000 13.6 Master Site Plans (COMM)
$50,000 COMM_Key
Montour Montour Area Recreation Commission
Hess Field /Robbins Trail Park
BRC-‐PRD-‐13.3-‐400
$61,400 $61,400 13.3 Park Rehabilitation and Development (COMM)
$122,900 COMM_Key
Montour Montour County Circuit Rider BRC-‐TAG-‐11-‐252
$53,300 $72,228 11 Circuit Rider (COMM)
$91,800 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 428 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Montour Montour County Comp.Recreation Park & Open Space Plan
KEY-‐TAG-‐5-‐136
$15,000 $15,000 5 Comp. Rec., Park, & Open Space Plans (COMM)
$30,000 COMM_Key
Montour Montour County J. Manley Robbins Trail
BRC-‐RTD-‐8-‐21
$98,000 $23,000 8 Rail Rehabilitation and Development (RT)
$548,900 RT_Key
Montour Montour County Montour Preserve Envir. Ed. Center
KEY-‐PRD-‐3-‐145
$200,000 $50,000 3 Park Rehabilitation and Development (COMM)
$480,000 COMM_Key
Montour Washingtonville Borough
Frank E. DeLong Memorial Park Rehabilitation
BRC-‐SC-‐12-‐127
$40,000 $40,000 12 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Multiple Alliance for the Chesapeake Bay, Inc.
Susquehanna River Water Trail
BRC-‐RCI-‐7-‐3 $30,750 $30,000 7 Implementation (RIV)
$62,945 RIVER_Key
Multiple American Littoral Society
Schuylkill Watershed Congress
BRC-‐RCI-‐9-‐1 $34,000 $20,000 9 Implementation (RIV)
$82,000 RIVER_Key
Multiple Beaver/Butler Councils of Governments
Fifteen Sites KEY-‐PRD-‐2-‐8
$177,262 $160,100 2 Park Rehabilitation and Development (COMM)
$354,524 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 429 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Multiple Cambria Somerset Authority
Comprehensive Land Management Plan
BRC-‐TAG-‐7-‐33
$38,250 $38,000 7 Master Site Plans (COMM)
$76,500 COMM_Key
Multiple Cambria Somerset Authority
Wilmore Reservoir Recreation Area
BRC-‐PRD-‐9-‐42
$118,300 $118,000 9 Park Rehabilitation and Development (COMM)
$237,400 COMM_Key
Multiple Eastern Pennsylvania Coalition for Abandoned Mine Reclamation
Bowman's Creek KEY-‐CHP-‐2-‐2
$5,000 $5,000 5 Coldwater Heritage Partnership
$5,000 RIVER_Key
Multiple Endless Mountains Resource Conservation Trust
Pine Creek Watershed Conservation Plan
BRC-‐RCP-‐8-‐12
$157,000 $152,000 8 Planning (RIV) $314,000 RIVER_Key
Multiple Hawk Mountain Sanctuary Association
Master and Strategic Plan
KEY-‐LTP-‐4-‐7 $40,000 $42,000 4 Critical Habitat Planning (LT)
$92,300 LT_Key
Multiple Headwaters Charitable Trust
Feasibility Study KEY-‐RTP-‐95-‐14
$15,000 $15,000 1 Feasibility Studies (RT)
$30,000 RT_Key
Multiple Headwaters R. C. & D. Council
Clarion River Conservation Plan
KEY-‐RCP-‐95-‐02
$50,000 $50,000 1 Planning (RIV) $115,800 RIVER_Key
Multiple Heritage Conservancy
Middle Delaware River Plan
BRC-‐RCP-‐6-‐2
$42,190 $42,000 6 Planning (RIV) $93,990 RIVER_Key
Multiple Heritage Conservancy
N.E. Pa. Conservation Plan
KEY-‐LTP-‐1-‐4 $20,000 $20,000 1 Open Space Planning (LT)
$40,000 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 430 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Multiple Heritage Conservancy
Schuylkill Riparian Buffer Assessment/Restoration
BRC-‐RCI-‐11-‐8
$21,200 $20,000 11 Implementation (RIV)
$106,900 RIVER_Key
Multiple Juniata Clean Water Partnership
Mainline Canal Greenway Education & Outreach
BRC-‐RCP-‐13.3-‐476
$60,100 $50,000 13.3 Education and Training (COMM)
$120,800 RIVER_Key
Multiple Lehigh County Conservation District
Saucon Creek Watershed Rivers Conservation Plan
BRC-‐RCP-‐12.5-‐1
$50,000 $50,000 12.5 Planning (RIV) $106,100 COMM_Key
Multiple Mountain Watershed Association, Inc.
Indian Creek Watershed Plan
KEY-‐RCP-‐5-‐16
$50,000 $50,000 5 Planning (RIV) $118,700 RIVER_Key
Multiple National Audubon Society, Inc.
Important Bird Area Conservation Planning
KEY-‐LTP-‐5-‐8 $182,100 $220,000 5 Open Space Planning (LT)
$440,000 LT_Key
Multiple National Audubon Society, Inc.
Kittatinny Ridge and Applachian Trail Conservation 2014
BRC-SR-19-174
$184,516.00 $160,000.00 19 Partnerships Projects
$369,032.00 LT_Key
Multiple Natural Lands Trust, Inc.
PA Piedmont "Big Woods" Conservation Plan
KEY-‐LTP-‐5-‐10
$50,000 $25,000 5 Open Space Planning (LT)
$100,000 LT_Key
Multiple North Central Pennsylvania Regional Planning and Development Commission
North Central PA Greenways Implementation Program
BRC-‐SR-‐17-‐201
$150,000 $150,000 17 Partnerships Projects
$300,000 COMM_Key
Multiple Northampton County
Circuit Rider-‐D & L Trail Planner
BRC-‐TAG-‐7-‐3
$40,000 $101,000 7 Circuit Rider (COMM)
$330,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 431 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Multiple Northcentral Pennsylvania Conservancy
Lower W. Br. Susquehanna River Corridor Plan
BRC-‐RCP-‐6-‐16
$266,200 $266,000 6 Planning (RIV) $532,400 RIVER_Key
Multiple Octoraro Watershed Association
Octoraro Watershed Conservation Plan
KEY-‐RCP-‐96-‐11
$20,000 $20,000 3 Planning (RIV) $40,000 RIVER_Key
Multiple Pennsylvania Environmental Council, Inc.
Allegheny River Corridor Plan
BRC-‐RCP-‐9-‐14
$130,000 $110,000 9 Planning (RIV) $260,000 RIVER_Key
Multiple Pennsylvania Environmental Council, Inc.
Bowman Creek Watershed Plan
BRC-‐RCP-‐6-‐14
$35,800 $36,000 6 Planning (RIV) $71,600 RIVER_Key
Multiple Pennsylvania Environmental Council, Inc.
North Branch Susquehanna River Corridor Plan
KEY-‐RCP-‐5-‐13
$95,000 $95,000 5 Planning (RIV) $289,200 RIVER_Key
Multiple Pennsylvania Environmental Council, Inc.
Tunkhannock Creek Watershed Plan
KEY-‐RCP-‐95-‐21
$50,000 $50,000 1 Planning (RIV) $116,900 RIVER_Key
Multiple Perkiomen Watershed Conservancy
Lower Perkiomen Creek Watershed Plan
BRC-‐RCP-‐6-‐10
$80,000 $80,000 6 Planning (RIV) $160,000 RIVER_Key
Multiple Regional Trail Corporation
"Trail Towns" Initiative
BRC-‐RTP-‐8-‐13
$50,000 $50,000 8 Feasibility Studies (RT)
$100,000 RT_Key
Multiple Regional Trail Corporation
Youghiogheny River Conservation Plan
KEY-‐RCP-‐95-‐10
$50,000 $50,000 1 Planning (RIV) $100,000 RIVER_Key
Keystone Fund Projects by County (1994-‐2013)
Page 432 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Multiple Regional Trail Corporation
Youghiogheny River Trail (North Section)
KEY-‐RTD-‐3-‐18
$50,000 $50,000 3 Rail Rehabilitation and Development (RT)
$870,000 RT_Key
Multiple Schuylkill River Greenway Association
Schuylkill River Trails Comp. Sign System Plan
BRC-‐RCI-‐9-‐16
$21,500 $20,000 9 Implementation (RIV)
$43,000 RIVER_Key
Multiple SEDA-‐Council of Governments
Conduit Grant BRC-‐PRD-‐7-‐171
$292,000 $300,000 7 Park Rehabilitation and Development (COMM)
$401,750 COMM_Key
Multiple SEDA-Council of Governments
Susquehanna Greenway Implementation and Technical Assistance 2014
BRC-SR-19-193
$322,898.00 $270,000.00 19 Partnerships Projects
$736,340.00 COMM_Key
Multiple SEDA-Council of Governments
Susquehanna Greenway Implementation and Technical Assistance 2014
BRC-SR-19-193
$322,898.00 $270,000.00 19 Partnerships Projects
$736,340.00 COMM_Key
Multiple SEDA-Council of Governments
Susquehanna Greenway Implementation and Technical Assistance 2014
BRC-SR-19-193
$322,898.00 $270,000.00 19 Partnerships Projects
$736,340.00 COMM_Key
Multiple SEDA-Council of Governments
Susquehanna Greenway Implementation and Technical Assistance 2014
BRC-SR-19-193
$322,898.00 $270,000.00 19 Partnerships Projects
$736,340.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 433 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Multiple SEDA-Council of Governments
Susquehanna Greenway Implementation and Technical Assistance 2014
BRC-SR-19-193
$322,898.00 $270,000.00 19 Partnerships Projects
$736,340.00 COMM_Key
Multiple SEDA-Council of Governments
Susquehanna Greenway Implementation and Technical Assistance 2014
BRC-SR-19-193
$322,898.00 $270,000.00 19 Partnerships Projects
$736,340.00 COMM_Key
Multiple SEDA-Council of Governments
Susquehanna Greenway Implementation and Technical Assistance 2014
BRC-SR-19-193
$322,898.00 $270,000.00 19 Partnerships Projects
$736,340.00 COMM_Key
Multiple SEDA-Council of Governments
Susquehanna Greenway Implementation and Technical Assistance 2014
BRC-SR-19-193
$322,898.00 $270,000.00 19 Partnerships Projects
$736,340.00 COMM_Key
Multiple SEDA-Council of Governments
Susquehanna Greenway Implementation and Technical Assistance 2014
BRC-SR-19-193
$322,898.00 $270,000.00 19 Partnerships Projects
$736,340.00 COMM_Key
Multiple SEDA-Council of Governments
Susquehanna Greenway Implementation and Technical Assistance 2014
BRC-SR-19-193
$322,898.00 $270,000.00 19 Partnerships Projects
$736,340.00 COMM_Key
Multiple SEDA-Council of Governments
Susquehanna Greenway Implementation and Technical Assistance 2014
BRC-SR-19-193
$322,898.00 $270,000.00 19 Partnerships Projects
$736,340.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 434 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Multiple SEDA-Council of Governments
Susquehanna Greenway Implementation and Technical Assistance 2014
BRC-SR-19-193
$322,898.00 $270,000.00 19 Partnerships Projects
$736,340.00 COMM_Key
Multiple SEDA-Council of Governments
Susquehanna Greenway Implementation and Technical Assistance 2014
BRC-SR-19-193
$322,898.00 $270,000.00 19 Partnerships Projects
$736,340.00 COMM_Key
Multiple SEDA-Council of Governments
Susquehanna Greenway Implementation and Technical Assistance 2014
BRC-SR-19-193
$322,898.00 $270,000.00 19 Partnerships Projects
$736,340.00 COMM_Key
Multiple SEDA-Council of Governments
Susquehanna Greenway Implementation and Technical Assistance 2014
BRC-SR-19-193
$322,898.00 $270,000.00 19 Partnerships Projects
$736,340.00 COMM_Key
Multiple SEDA-Council of Governments
Susquehanna Greenway Implementation and Technical Assistance 2014
BRC-SR-19-193
$322,898.00 $270,000.00 19 Partnerships Projects
$736,340.00 COMM_Key
Multiple SEDA-Council of Governments
Susquehanna Greenway Implementation and Technical Assistance 2014
BRC-SR-19-193
$322,898.00 $270,000.00 19 Partnerships Projects
$736,340.00 COMM_Key
Multiple SEDA-Council of Governments
Susquehanna Greenway Implementation and Technical Assistance 2014
BRC-SR-19-193
$322,898.00 $270,000.00 19 Partnerships Projects
$736,340.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 435 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Multiple SEDA-Council of Governments
Susquehanna Greenway Implementation and Technical Assistance 2014
BRC-SR-19-193
$322,898.00 $270,000.00 19 Partnerships Projects
$736,340.00 COMM_Key
Multiple Shippensburg Area Recreation & Park Commission
Circuit Rider Director of Recreation & Parks
BRC-‐TAG-‐12-‐54
$6,250 $6,250 12 Circuit Rider (COMM)
$25,000 COMM_Key
Multiple Southern Alleghenies Conservancy
Manufacturers Water Co.Tracts
KEY-‐LTA-‐5-‐16
$1,500,000 $750,000 5 Open Space Acquisition (LT)
$4,850,000 LT_Key
Multiple Steel Industry Heritage Corporation
Monongahela River Conservation Plan
KEY-‐RCP-‐95-‐15
$50,000 $50,000 1 Planning (RIV) $100,000 RIVER_Key
Multiple Stream Restoration, Inc.
Slippery Rock Creek Watershed RCP
BRC-‐RCP-‐12.5-‐22
$94,100 $94,000 12.5 Planning (RIV) $188,200 RIVER_Key
Multiple The Conservation Fund
Schuylkill River Watershed Conservation Plan
KEY-‐RCP-‐96-‐07
$225,000 $225,000 3 Planning (RIV) $450,000 RIVER_Key
Multiple The Nature Conservancy
Serpentine Barrens Conservation Plan
KEY-‐LTP-‐1-‐14
$50,000 $50,000 1 Critical Habitat Planning (LT)
$100,000 LT_Key
Multiple Western Pennsylvania Conservancy
Clarion River Corridor
KEY-‐LTA-‐3-‐21
$871,225 $550,000 3 Open Space Acquisition (LT)
$1,100,000 LT_Key
Multiple Western Pennsylvania Conservancy
Clarion River Corridor
KEY-‐LTA-‐4-‐22
$800,000 $500,000 4 Open Space Acquisition (LT)
$1,600,000 LT_Key
Multiple Western Pennsylvania Conservancy
French Creek Watershed Plan
KEY-‐RCP-‐5-‐18
$150,000 $100,000 5 Planning (RIV) $300,000 RIVER_Key
Keystone Fund Projects by County (1994-‐2013)
Page 436 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Multiple Western Pennsylvania Conservancy
Mahoning Creek Regional Watershed Conservation Plan
BRC-‐RCP-‐13.3-‐514
$50,000 $50,000 13.3 Planning (RIV) $100,000 RIVER_Key
Multiple Western Pennsylvania Conservancy
Shenango River Watershed Conservation Plan
BRC-‐RCP-‐8-‐25
$145,000 $145,000 8 Planning (RIV) $307,000 RIVER_Key
Multiple Western Pennsylvania Conservancy
Sinnemahoning Creek Watershed Conservation Plan
BRC-‐RCP-‐12-‐17
$150,000 $150,000 12 Planning (RIV) $342,900 RIVER_Key
Multiple Wildlands Conservancy, Inc.
Bog Turtle Habitat Inventory and Management Plan
KEY-‐LTP-‐5-‐23
$16,703 $16,000 5 Critical Habitat Planning (LT)
$33,400 LT_Key
Multiple Wildlands Conservancy, Inc.
Lehigh River Watershed Plan
KEY-‐RCP-‐5-‐7
$350,000 $150,000 5 Planning (RIV) $715,733 RIVER_Key
Multiple Wildlands Conservancy, Inc.
Nesquehoning Cr. Acid Mine Drainage Treatment
BRC-‐RCD-‐9-‐18
$80,000 $80,000 9 Development (RIV)
$210,000 RIVER_Key
Northampton Allen Township Lower Property Acquisition
BRC-‐ACQ-‐12.5-‐11
$115,000 $115,000 12.5 Acquisition (COMM)
$230,000 COMM_Key
Northampton Bangor Borough Two Sites BRC-‐PRD-‐13-‐335
$126,200 $126,000 13 Park Rehabilitation and Development (COMM)
$252,400 COMM_Key
Northampton Bath Borough Monocacy Creek Park
BRC-‐ACQ-‐7-‐16
$24,500 $31,000 7 Acquisition (COMM)
$49,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 437 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Northampton Bath Borough Monocacy Creek Park
BRC-‐PRD-‐7-‐17
$62,235 $62,000 7 Park Rehabilitation and Development (COMM)
$124,470 COMM_Key
Northampton Bethlehem City Bethlehem Skateplaza -‐ Phase 2 -‐ Development
BRC-‐PRD-‐16-‐122
$250,000 $185,000 16 Park Rehabilitation and Development (COMM)
$673,000 COMM_Key
Northampton Bethlehem City Higbee Park-‐ Development
BRC-‐PRD-‐16-‐1
$75,000 $75,000 16 Park Rehabilitation and Development (COMM)
$159,683 COMM_Key
Northampton Bethlehem City Ice House KEY-‐PRD-‐1-‐11
$250,000 $150,000 1 Park Rehabilitation and Development (COMM)
$512,349 COMM_Key
Northampton Bethlehem City Johnston Park Development
BRC-‐RCD-‐17-‐167
$70,000 $58,800 17 Development (RIV)
$140,000 RIVER_Key
Northampton Bethlehem City Monocacy Way Pathway
KEY-‐PRD-‐3-‐20
$45,000 $45,000 3 Park Rehabilitation and Development (COMM)
$90,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 438 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Northampton Bethlehem City Sand Island BRC-‐PRD-‐11-‐260
$200,000 $200,000 11 Park Rehabilitation and Development (COMM)
$850,000 COMM_Key
Northampton Bethlehem City Skate Park-‐Phase I BRC-‐PRD-‐13-‐90
$430,000 $400,000 13 Park Rehabilitation and Development (COMM)
$860,000 COMM_Key
Northampton Bethlehem City South Bethlehem Greenway -‐ East 6th Street to Saucon Park Dev.
BRC-‐PRD-‐17-‐106
$200,000 $200,000 17 Park Rehabilitation and Development (COMM)
$400,000 COMM_Key
Northampton Bethlehem City South Bethlehem Greenway -‐ Phase II & III
BRC-‐PRD-‐14-‐114
$400,000 $600,000 14 Park Rehabilitation and Development (COMM)
$800,000 COMM_Key
Northampton Bethlehem City South Bethlehem Greenway – Connection to Saucon Park Ballfields – Development
BRC-PRD-19-58
$500,000.00 $500,000.00 19 Park Rehabilitation and Development (COMM)
$1,007,530.00 COMM_Key
Northampton Bethlehem City South Bethlehem Greenway – Connection to Saucon Park Ballfields – Development
BRC-PRD-19-58
$500,000.00 $500,000.00 19 Park Rehabilitation and Development (COMM)
$1,007,530.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 439 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Northampton Bethlehem City South Bethlehem Greenway – Connection to Saucon Park Ballfields – Development
BRC-PRD-19-58
$500,000.00 $500,000.00 19 Park Rehabilitation and Development (COMM)
$1,007,530.00 COMM_Key
Northampton Bethlehem City South Bethlehem Greenway-‐ Phase I
BRC-‐PRD-‐13.3-‐551
$400,000 $450,000 13.3 Park Rehabilitation and Development (COMM)
$1,600,000 COMM_Key
Northampton Bethlehem City South Bethlehem Railway
BRC-‐RTA-‐10-‐5
$600,000 $500,000 10 Acquisition (RT) $1,200,000 COMM_Key
Northampton Bethlehem Township Janet Johnston Housenick/William D. Housenick Memorial Park
BRC-PRD-19-59
$203,986.00 $203,000.00 19 Park Rehabilitation and Development (COMM)
$444,934.00 COMM_Key
Northampton Bethlehem Township Janet Johnston Housenick/William D. Housenick Memorial Park
BRC-PRD-19-59
$203,986.00 $203,000.00 19 Park Rehabilitation and Development (COMM)
$444,934.00 COMM_Key
Northampton Bethlehem Township Janet Johnston Housenick/William D. Housenick Memorial Park
BRC-PRD-19-59
$203,986.00 $203,000.00 19 Park Rehabilitation and Development (COMM)
$444,934.00 COMM_Key
Northampton Bethlehem Township Janet Johnston Housenick/William D. Housenick Memorial Park
BRC-PRD-19-59
$203,986.00 $203,000.00 19 Park Rehabilitation and Development (COMM)
$444,934.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 440 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Northampton Bethlehem Township Janet Johnston Housenick/William D. Housenick Memorial Park
BRC-PRD-19-59
$203,986.00 $203,000.00 19 Park Rehabilitation and Development (COMM)
$444,934.00 COMM_Key
Northampton Bethlehem Township
Master Site Development Plan
KEY-‐TAG-‐2-‐12
$15,000 $15,000 2 Master Site Plans (COMM)
$30,000 COMM_Key
Northampton Bethlehem Township
North Side Athletic Complex -‐ Phase II
KEY-‐PRD-‐4-‐15
$117,900 $100,000 4 Park Rehabilitation and Development (COMM)
$235,800 COMM_Key
Northampton Bushkill Township Bushkill Township Recreation Complex– Development
BRC-PRD-19-62
$74,646.94 $74,600.00 19 Park Rehabilitation and Development (COMM)
$149,293.88 COMM_Key
Northampton Bushkill Township Bushkill Township Recreation Complex– Development
BRC-PRD-19-62
$74,646.94 $74,600.00 19 Park Rehabilitation and Development (COMM)
$149,293.88 COMM_Key
Northampton Bushkill Township Bushkill Township Recreation Complex– Development
BRC-PRD-19-62
$74,646.94 $74,600.00 19 Park Rehabilitation and Development (COMM)
$149,293.88 COMM_Key
Northampton Bushkill Township MAB Family Partnership Property Acquisition
BRC-‐ACQ-‐18-‐4
$656,500 $656,500 18 Acquisition (COMM)
$1,313,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 441 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Northampton Bushkill Township PPL Trail BRC-‐PRD-‐13.6-‐567
$200,000 $200,000 13.6 Park Rehabilitation and Development (COMM)
$400,000 COMM_Key
Northampton Bushkill Township Recreation Area Master Site Plan
BRC-‐TAG-‐16-‐54
$24,000 $24,000 16 Master Site Plans (COMM)
$48,000 COMM_Key
Northampton Bushkill Township Township Park Master Site Plan
BRC-‐TAG-‐18-‐144
$19,250 $19,200 18 Master Site Plans (COMM)
$38,503 COMM_Key
Northampton Chapman Borough Borough Park BRC-‐SC-‐6-‐35
$20,000 $20,000 6 Small Communities/Small Projects (COMM)
$25,000 COMM_Key
Northampton East Allen Township Jacksonville Park MSP & Greenway FS
BRC-‐TAG-‐12.5-‐28
$10,000 $10,000 12.5 Master Site Plans (COMM)
$20,000 COMM_Key
Northampton East Allen Township Sunny Slope Farm Acquisition
BRC-‐ACQ-‐17-‐92
$86,000 $84,500 17 Acquisition (COMM)
$174,000 COMM_Key
Northampton Easton City 2 Pool Feasibility Study
BRC-‐TAG-‐13.3-‐468
$15,000 $15,000 13.3 Feasibility Studies (COMM)
$30,000 COMM_Key
Northampton Easton City Bushkill Drive Path to KSAT – Development
BRC-PRD-19-77
$120,000.00 $75,000.00 19 Park Rehabilitation and Development (COMM)
$150,000.00 COMM_Key
Northampton Easton City Bushkill Drive Path to KSAT – Development
BRC-PRD-19-77
$120,000.00 $75,000.00 19 Park Rehabilitation and Development (COMM)
$150,000.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 442 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Northampton Easton City Bushkill Drive Path to KSAT – Development
BRC-PRD-19-77
$120,000.00 $75,000.00 19 Park Rehabilitation and Development (COMM)
$150,000.00 COMM_Key
Northampton Easton City Comp. Parks, Recreation & Open Space Plan
BRC-‐TAG-‐10-‐151
$20,000 $20,000 10 Comp. Rec., Park, & Open Space Plans (COMM)
$45,000 COMM_Key
Northampton Easton City Eddyside Pool BRC-‐PRD-‐6-‐57
$82,500 $82,000 6 Park Rehabilitation and Development (COMM)
$165,000 COMM_Key
Northampton Easton City Heil Park -‐ Development
BRC-‐PRD-‐16-‐130
$213,200 $213,000 16 Park Rehabilitation and Development (COMM)
$426,400 COMM_Key
Northampton Easton City Heil Pool BRC-‐PRD-‐14-‐131
$300,000 $300,000 14 Park Rehabilitation and Development (COMM)
$600,000 COMM_Key
Northampton Easton City Hugh Moore Park-‐ Development
BRC-‐PRD-‐18-‐67
$325,000 $175,000 18 Park Rehabilitation and Development (COMM)
$675,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 443 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Northampton Easton City Milton Street, Eddyside, Heil Parks
BRC-‐PRD-‐13.3-‐355
$75,000 $75,000 13.3 Park Rehabilitation and Development (COMM)
$150,000 COMM_Key
Northampton Hanover Township Two Sites KEY-‐PRD-‐5-‐80
$77,600 $77,600 5 Park Rehabilitation and Development (COMM)
$155,200 COMM_Key
Northampton Hellertown Borough Dimmick Park -‐ MSP BRC-‐TAG-‐13-‐185
$14,800 $14,800 13 Master Site Plans (COMM)
$29,600 COMM_Key
Northampton Hellertown Borough Recreation Peer-‐to-‐Peer
BRC-‐TAG-‐16-‐243
$10,000 $10,000 16 Peer-‐to-‐Peer Tech. Assistance (COMM)
$11,000 COMM_Key
Northampton Hellertown Borough Water Street Park – Development
BRC-PRD-19-83
$124,344.00 $124,000.00 19 Park Rehabilitation and Development (COMM)
$248,688.00 COMM_Key
Northampton Hellertown Borough Water Street Park – Development
BRC-PRD-19-83
$124,344.00 $124,000.00 19 Park Rehabilitation and Development (COMM)
$248,688.00 COMM_Key
Northampton Hellertown Borough Water Street Park – Development
BRC-PRD-19-83
$124,344.00 $124,000.00 19 Park Rehabilitation and Development (COMM)
$248,688.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 444 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Northampton Heritage Conservancy
Smejkal Easement BRC-‐LTA-‐13.3-‐516
$59,800 $59,800 13.3 Open Space Acquisition (LT)
$119,600 LT_Key
Northampton Heritage Conservancy
Wentzell Conservation Easement
BRC-‐LTA-‐12.5-‐6
$53,000 $53,000 12.5 Open Space Acquisition (LT)
$106,000 LT_Key
Northampton Lower Saucon Township
Dravecz Acquisition and Easements
BRC-‐ACQ-‐14-‐61
$244,500 $244,000 14 Acquisition (COMM)
$489,000 COMM_Key
Northampton Lower Saucon Township
Kingston, Polk Valley and Steel City Parks-‐Development
BRC-‐PRD-‐17-‐135
$99,595 $90,000 17 Park Rehabilitation and Development (COMM)
$199,189 COMM_Key
Northampton Lower Saucon Township
Polk Valley Park BRC-‐PRD-‐13.3-‐388
$27,800 $20,000 13.3 Park Rehabilitation and Development (COMM)
$70,800 COMM_Key
Northampton Lower Saucon Township
Rail Trail Trailhead Access -‐ Acquisition
BRC-‐ACQ-‐17-‐95
$29,725 $29,700 17 Acquisition (COMM)
$59,450 COMM_Key
Northampton Lower Saucon Township
Town Hall Park BRC-‐PRD-‐6-‐99
$22,000 $22,000 6 Park Rehabilitation and Development (COMM)
$44,000 COMM_Key
Northampton Martins Jacoby Watershed Association
Watershed Conservation Plan for Northeastern Northampton Co.
BRC-‐RCP-‐12-‐9
$12,500 $12,500 12 Planning (RIV) $25,000 RIVER_Key
Keystone Fund Projects by County (1994-‐2013)
Page 445 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Northampton Natural Lands Trust, Inc.
McBrien Conservation Easement
BRC-‐LTA-‐12.5-‐12
$157,500 $150,000 12.5 Open Space Acquisition (LT)
$347,700 LT_Key
Northampton Nazareth Area Council of Governments
Multi-‐Municipal Rec. & Park Plan
BRC-‐TAG-‐9-‐146
$31,200 $31,000 9 Comp. Rec., Park, & Open Space Plans (COMM)
$62,500 COMM_Key
Northampton North Catasauqua Borough
Arch Street Playground
KEY-‐SC-‐1-‐97 $20,000 $20,000 1 Small Communities/Small Projects (COMM)
$22,112 COMM_Key
Northampton Northampton Borough
D&L Trail Development – Northampton Borough – Development
BRC-‐TAG-‐17-‐17
$160,000 $160,000 17 Trail Study (COMM)
$648,750 COMM_Key
Northampton Northampton Borough
Lehigh Canal Heritage Trail and Bridge
BRC-‐PRD-‐8-‐139
$50,000 $50,000 8 Park Rehabilitation and Development (COMM)
$264,000 COMM_Key
Northampton Northampton County
Master Site Development Plan
KEY-‐TAG-‐1-‐101
$39,600 $20,000 1 Master Site Plans (COMM)
$99,000 COMM_Key
Northampton Northampton County
Nor-‐Bath Trail -‐ Phase III Improvements
KEY-‐RTD-‐3-‐15
$60,000 $60,000 3 Rail Rehabilitation and Development (RT)
$120,000 RT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 446 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Northampton Northampton County
Nor-‐Bath Trail -‐ Phase IV
BRC-‐PRD-‐6-‐129
$100,000 $100,000 6 Park Rehabilitation and Development (COMM)
$400,000 COMM_Key
Northampton Northampton County
Nor-‐Bath Trail-‐ Phase II
KEY-‐RTD-‐95-‐21
$40,000 $40,000 1 Rail Rehabilitation and Development (RT)
$100,000 RT_Key
Northampton Northampton County
Totts Gap Acquisition
BRC-‐ACQ-‐11-‐184
$670,700 $625,000 11 Acquisition (COMM)
$1,589,100 COMM_Key
Northampton Northampton County
Wayne A. Grube Memorial Park -‐ Development
BRC-‐PRD-‐13.3-‐407
$545,000 $150,000 13.3 Park Rehabilitation and Development (COMM)
$2,179,300 COMM_Key
Northampton Palmer Township Intermunicipal Bikeway/Walkway
KEY-‐RTD-‐95-‐23
$71,000 $71,000 1 Rail Rehabilitation and Development (RT)
$142,000 RT_Key
Northampton Palmer Township Palmer Township Bike Path
BRC-‐PRD-‐14-‐160
$200,000 $200,000 14 Park Rehabilitation and Development (COMM)
$400,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 447 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Northampton Palmer Township Recreational Trail BRC-‐RTD-‐9-‐9
$189,500 $150,000 9 Rail Rehabilitation and Development (RT)
$379,000 RT_Key
Northampton Pen Argyl Borough Weona Park BRC-‐SC-‐6-‐137
$20,000 $20,000 6 Small Communities/Small Projects (COMM)
$23,700 COMM_Key
Northampton Pen Argyl Borough Weona Park BRC-‐SC-‐7-‐150
$30,381 $30,000 7 Small Communities/Small Projects (COMM)
$40,762 COMM_Key
Northampton Pen Argyl Borough Weona Park Expansion -‐ Land Acquisition
BRC-‐ACQ-‐13.3-‐282
$300,000 $300,000 13.3 Acquisition (COMM)
$1,350,000 COMM_Key
Northampton Pen Argyl Borough Weona Park Master Site Plan
BRC-‐TAG-‐6-‐138
$19,500 $19,500 6 Master Site Plans (COMM)
$39,000 COMM_Key
Northampton Plainfield Township Community Park BRC-‐PRD-‐13-‐135
$199,800 $200,000 13 Park Rehabilitation and Development (COMM)
$399,600 COMM_Key
Northampton Roseto Borough Borough Park-‐Phase I
KEY-‐SC-‐2-‐132
$19,770 $19,700 2 Small Communities/Small Projects (COMM)
$19,770 COMM_Key
Northampton Roseto Borough Roseto Municipal Park
BRC-‐SC-‐7-‐167
$40,000 $40,000 7 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 448 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Northampton Stockertown Borough
Stockertown Recreation Trail
BRC-‐PRD-‐16-‐212
$100,000 $100,000 16 Park Rehabilitation and Development (COMM)
$250,436 COMM_Key
Northampton Tatamy Borough Tatamy Borough Trail
BRC-‐RTD-‐8-‐16
$106,400 $106,000 8 Rail Rehabilitation and Development (RT)
$212,700 RT_Key
Northampton The Nature Conservancy
Broad Acquisition (Minsi Corridor/Kittatinny Ridge)
BRC-‐LTA-‐17-‐59
$81,200 $77,900 17 Open Space Acquisition (LT)
$162,400 LT_Key
Northampton The Nature Conservancy
Garofalo Acquisition BRC-‐LTA-‐14-‐44
$47,200 $47,200 14 Critical Habitat Acquisition (LT)
$94,400 LT_Key
Northampton The Nature Conservancy
Janette/Comunale Acquisition
BRC-‐LTA-‐16-‐37
$195,000 $172,500 16 Open Space Acquisition (LT)
$390,000 LT_Key
Northampton The Nature Conservancy
Kirkridge Easement (Minsi Corridor/Kittatinny Ridge)
BRC-‐LTA-‐17-‐60
$252,750 $269,700 17 Open Space Acquisition (LT)
$505,500 LT_Key
Northampton The Nature Conservancy
Miller/Kies Acquisition
BRC-‐LTA-‐14-‐45
$47,500 $35,400 14 Critical Habitat Acquisition (LT)
$95,000 LT_Key
Northampton The Nature Conservancy
Mt. Bethel Fens Conservation Plan
KEY-‐LTP-‐2-‐11
$50,000 $50,000 2 Critical Habitat Planning (LT)
$100,000 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 449 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Northampton The Nature Conservancy
Ribitzki Land Acquisition (Minsi Lake Corridor)
BRC-LTA-19-28
$181,000.00 $181,000.00 19 Open Space Acquisition (LT)
$362,000.00 LT_Key
Northampton The Nature Conservancy
Ribitzki Land Acquisition (Minsi Lake Corridor)
BRC-LTA-19-28
$181,000.00 $181,000.00 19 Open Space Acquisition (LT)
$362,000.00 LT_Key
Northampton The Nature Conservancy
Ribitzki Land Acquisition (Minsi Lake Corridor)
BRC-LTA-19-28
$181,000.00 $181,000.00 19 Open Space Acquisition (LT)
$362,000.00 LT_Key
Northampton The Nature Conservancy
Wolf Property Acquisition -‐ Minsi Lake Corridor
BRC-‐LTA-‐12-‐32
$1,751,500 $650,000 12 Open Space Acquisition (LT)
$3,503,000 LT_Key
Northampton Two Rivers Areas Council of Governments
Lehigh/Delaware Rivers & Bushkill Creek
KEY-‐RCP-‐95-‐05
$47,700 $47,700 1 Planning (RIV) $95,400 RIVER_Key
Northampton Upper Mount Bethel Township
Community Park - Development
BRC-PRD-19-122
$119,000.00 $119,000.00 19 Park Rehabilitation and Development (COMM)
$246,423.00 COMM_Key
Northampton Upper Mount Bethel Township
Community Park - Development
BRC-PRD-19-122
$119,000.00 $119,000.00 19 Park Rehabilitation and Development (COMM)
$246,423.00 COMM_Key
Northampton Upper Mount Bethel Township
Community Park - Development
BRC-PRD-19-122
$119,000.00 $119,000.00 19 Park Rehabilitation and Development (COMM)
$246,423.00 COMM_Key
Northampton Upper Mount Bethel Township
Comprehensive Rec., Park & Open Space Plan
BRC-‐TAG-‐8-‐201
$22,600 $22,000 8 Comp. Rec., Park, & Open Space Plans (COMM)
$45,100 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 450 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Northampton Walnutport Borough Earl F. Snyder Park Pavilion
BRC-‐SC-‐11-‐161
$20,000 $20,000 11 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Northampton Walnutport Borough Lehigh Canal Park BRC-‐SC-‐6-‐186
$20,000 $20,000 6 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Northampton Washington Township
Shuman Tract Acquisition
BRC-‐ACQ-‐9-‐224
$53,000 $53,000 9 Acquisition (COMM)
$106,200 COMM_Key
Northampton Washington Township
Township Recreation Site
BRC-‐ACQ-‐6-‐192
$53,600 $50,000 6 Acquisition (COMM)
$107,200 COMM_Key
Northampton Wildlands Conservancy, Inc.
Monocacy Creek Restoration
BRC-‐RCD-‐6-‐1
$38,743 $39,000 6 Development (RIV)
$77,679 RIVER_Key
Northampton Williams Township Community Park Master Site Plan
BRC-‐TAG-‐6-‐209
$10,600 $10,600 6 Master Site Plans (COMM)
$21,200 COMM_Key
Northampton Williams Township Municipal Park KEY-‐SC-‐4-‐176
$20,000 $20,000 4 Small Communities/Small Projects (COMM)
$28,207 COMM_Key
Northampton Wilson Borough Fisk Field BRC-‐PRD-‐13-‐450
$200,000 $100,000 13 Park Rehabilitation and Development (COMM)
$794,300 COMM_Key
Northampton Wilson Borough Two Sites KEY-‐PRD-‐5-‐228
$100,000 $100,000 5 Park Rehabilitation and Development (COMM)
$200,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 451 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Northampton Wind Gap Borough Wind Gap Borough Park Master Plan
BRC-‐TAG-‐18-‐153
$24,000 $24,000 18 Master Site Plans (COMM)
$48,000 COMM_Key
Northampton Wind Gap Borough Wind Gap Borough Park Restroom
BRC-‐SC-‐8-‐221
$40,000 $40,000 8 Small Communities/Small Projects (COMM)
$80,000 COMM_Key
Northumberland Coal Township Arch Street Playground-Development
BRC-PRD-19-71
$100,567.00 $100,500.00 19 Park Rehabilitation and Development (COMM)
$201,134.00 COMM_Key
Northumberland Coal Township Arch Street Playground-Development
BRC-PRD-19-71
$100,567.00 $100,500.00 19 Park Rehabilitation and Development (COMM)
$201,134.00 COMM_Key
Northumberland Coal Township Arch Street Playground-Development
BRC-PRD-19-71
$100,567.00 $100,500.00 19 Park Rehabilitation and Development (COMM)
$201,134.00 COMM_Key
Northumberland
Coal Township Mulberry Street Playground Renovation
BRC-‐PRD-‐12-‐140
$43,350 $43,300 12 Park Rehabilitation and Development (COMM)
$86,700 COMM_Key
Northumberland
Delaware Township Fairchild-‐Nicely-‐Sterner Recreation Area Development
BRC-‐PRD-‐12-‐146
$200,000 $160,000 12 Park Rehabilitation and Development (COMM)
$883,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 452 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Northumberland
East Cameron Township
East Cameron Township Park
BRC-‐SC-‐11-‐117
$30,600 $30,600 11 Small Communities/Small Projects (COMM)
$41,300 COMM_Key
Northumberland
East Chillisquaque Township
East Chillisquaque Park
KEY-‐SC-‐1-‐41 $18,600 $18,600 1 Small Communities/Small Projects (COMM)
$24,400 COMM_Key
Northumberland
Herndon Borough Herndon Community Park-‐ Development
BRC-‐SC-‐18-‐33
$40,000 $40,000 18 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Northumberland
Kulpmont Borough Terry Miriello Stadium -‐ Development
BRC-‐SC-‐17-‐42
$40,000 $40,000 17 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Northumberland
Kulpmont Borough Two Sites KEY-‐SC-‐5-‐104
$20,000 $20,000 5 Small Communities/Small Projects (COMM)
$32,000 COMM_Key
Northumberland
Lower Mahanoy Township
Line Mountain Rec. Area
BRC-‐PRD-‐9-‐119
$495,800 $150,000 9 Park Rehabilitation and Development (COMM)
$1,805,000 COMM_Key
Northumberland
Marion Heights Borough
Community Park KEY-‐SC-‐4-‐94 $7,145 $7,200 4 Small Communities/Small Projects (COMM)
$13,245 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 453 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Northumberland
Marion Heights Borough
Marion Heights Borough Park
BRC-‐SC-‐10-‐86
$32,000 $40,000 10 Small Communities/Small Projects (COMM)
$44,000 COMM_Key
Northumberland
Milton Borough Brown Avenue Park -‐ Phase I
BRC-‐PRD-‐11-‐58
$155,000 $125,000 11 Park Rehabilitation and Development (COMM)
$310,000 COMM_Key
Northumberland
Milton Borough Brown Avenue Park -‐ Phase II
BRC-‐PRD-‐13-‐125
$150,000 $150,000 13 Park Rehabilitation and Development (COMM)
$300,000 COMM_Key
Northumberland
Milton Borough Brown Avenue Park -‐ Phase III
BRC-‐PRD-‐13.3-‐397
$150,000 $150,000 13.3 Park Rehabilitation and Development (COMM)
$300,000 COMM_Key
Northumberland
Milton Borough Community Pool KEY-‐PRD-‐4-‐104
$112,615 $100,000 4 Park Rehabilitation and Development (COMM)
$225,230 COMM_Key
Northumberland
Mount Carmel Borough
Peer-‐to-‐Peer KEY-‐TAG-‐5-‐234
$7,500 $5,321 5 Peer-‐to-‐Peer Tech. Assistance (COMM)
$8,250 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 454 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Northumberland
Northumberland Borough
Northumberland Borough & Point Twp. Recreation & Park Plan
BRC-‐TAG-‐12-‐257
$30,000 $30,000 12 Comp. Rec., Park, & Open Space Plans (COMM)
$90,000 COMM_Key
Northumberland Northumberland Borough
Northumberland Riverfront Trail – Development
BRC-PRD-19-101
$96,342.00 $96,000.00 19 Park Rehabilitation and Development (COMM)
$196,342.00 COMM_Key
Northumberland Northumberland Borough
Northumberland Riverfront Trail – Development
BRC-PRD-19-101
$96,342.00 $96,000.00 19 Park Rehabilitation and Development (COMM)
$196,342.00 COMM_Key
Northumberland Northumberland Borough
Northumberland Riverfront Trail – Development
BRC-PRD-19-101
$96,342.00 $96,000.00 19 Park Rehabilitation and Development (COMM)
$196,342.00 COMM_Key
Northumberland
Northumberland Borough
Pineknotter Park BRC-‐PRD-‐7-‐143
$179,000 $163,000 7 Park Rehabilitation and Development (COMM)
$605,134 COMM_Key
Northumberland
Northumberland County
Anthracite Outdoor Adventure Area – Phase 2 – Development
BRC-‐PRT-‐17-‐76
$1,583,828 $832,900 17 Construction $2,913,828 COMM_Key
Northumberland
Northumberland County
Natural Areas Inventory
BRC-‐TAG-‐6-‐131
$28,750 $28,700 6 Natural Areas Inventories (COMM)
$57,500 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 455 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Northumberland
Northumberland County
Northumberland County Greenway & Open Space Plan
BRC-‐TAG-‐14-‐226
$79,000 $50,000 14 Greenway Plans (COMM)
$158,000 COMM_Key
Northumberland
Northumberland County
Shamokin Creek Watershed Plan
KEY-‐RCP-‐5-‐12
$30,000 $30,000 5 Planning (RIV) $60,000 RIVER_Key
Northumberland Point Township North Branch Canal Trail – Point Township Trail Study - Planning
BRC-TAG-19-142
$30,000.00 $30,000.00 19 Feasibility Studies (COMM)
$60,000.00 COMM_Key
Northumberland Point Township North Branch Canal Trail – Point Township Trail Study - Planning
BRC-TAG-19-142
$30,000.00 $30,000.00 19 Feasibility Studies (COMM)
$60,000.00 COMM_Key
Northumberland Point Township North Branch Canal Trail – Point Township Trail Study - Planning
BRC-TAG-19-142
$30,000.00 $30,000.00 19 Feasibility Studies (COMM)
$60,000.00 COMM_Key
Northumberland
Point Township Township Park KEY-‐SC-‐5-‐166
$20,000 $20,000 5 Small Communities/Small Projects (COMM)
$26,100 COMM_Key
Northumberland
Ralpho Township Recreation Complex BRC-‐SC-‐6-‐155
$20,000 $20,000 6 Small Communities/Small Projects (COMM)
$55,472 COMM_Key
Northumberland
Ralpho Township Recreation Complex Renovations/Playground
BRC-‐SC-‐7-‐162
$39,123 $39,000 7 Small Communities/Small Projects (COMM)
$78,245 COMM_Key
Northumberland
Shamokin City Claude Kehler Park BRC-‐PRD-‐13.3-‐429
$208,000 $208,000 13.3 Park Rehabilitation and Development (COMM)
$416,050 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 456 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Northumberland Shamokin City Claude Kehler Park- Phase 2- Development
BRC-PRD-19-113
$250,000.00 $250,000.00 19 Park Rehabilitation and Development (COMM)
$500,000.00 COMM_Key
Northumberland Shamokin City Claude Kehler Park- Phase 2- Development
BRC-PRD-19-113
$250,000.00 $250,000.00 19 Park Rehabilitation and Development (COMM)
$500,000.00 COMM_Key
Northumberland Shamokin City Claude Kehler Park- Phase 2- Development
BRC-PRD-19-113
$250,000.00 $250,000.00 19 Park Rehabilitation and Development (COMM)
$500,000.00 COMM_Key
Northumberland
Shamokin City Shroyer Memorial Pool
KEY-‐PRD-‐4-‐137
$86,946 $87,000 4 Park Rehabilitation and Development (COMM)
$173,892 COMM_Key
Northumberland
Sunbury City Community Swimming Pool
BRC-‐PRD-‐6-‐177
$253,000 $185,000 6 Park Rehabilitation and Development (COMM)
$506,000 COMM_Key
Northumberland
Sunbury City Gateway Park -‐ Riverside
BRC-‐PRD-‐13.3-‐436
$517,600 $250,000 13.3 Park Rehabilitation and Development (COMM)
$1,585,300 COMM_Key
Northumberland
Sunbury City Susquehanna Riverfront Park Plan
BRC-‐TAG-‐9-‐201
$67,000 $67,000 9 Master Site Plans (COMM)
$134,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 457 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Northumberland
The Merrill W. Linn Land & Waterways Conservancy
Montandon Marsh KEY-‐LTA-‐1-‐6 $13,000 $13,000 1 Critical Habitat Acquisition (LT)
$26,000 LT_Key
Northumberland
Turbotville Borough Community Park KEY-‐SC-‐4-‐153
$20,000 $20,000 4 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Northumberland
Zerbe Township Township Park KEY-‐SC-‐3-‐246
$19,900 $19,900 3 Small Communities/Small Projects (COMM)
$19,900 COMM_Key
Northumberland
Zerbe Township Township Park-‐ Development
BRC-‐SC-‐16-‐52
$38,877 $40,000 16 Small Communities/Small Projects (COMM)
$58,955 COMM_Key
Northumberland
Zerbe Township Zerbe Township Park Plan
BRC-‐TAG-‐12-‐269
$12,500 $12,500 12 Master Site Plans (COMM)
$25,000 COMM_Key
Perry Carroll Township Carroll Township Community Park
BRC-‐PRD-‐7-‐35
$111,839 $53,000 7 Park Rehabilitation and Development (COMM)
$223,678 COMM_Key
Perry Carroll Township Siegfried Property Acquisition
BRC-‐ACQ-‐11-‐171
$149,500 $136,000 11 Acquisition (COMM)
$299,000 COMM_Key
Perry Carroll Township Valley Road Park -‐ Phase I-‐B
BRC-‐PRD-‐14-‐123
$180,000 $180,000 14 Park Rehabilitation and Development (COMM)
$360,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 458 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Perry Central Pennsylvania Conservancy
Millers Gap Acquisition
BRC-‐LTA-‐8-‐3
$89,200 $89,000 8 Critical Habitat Acquisition (LT)
$178,500 LT_Key
Perry Central Pennsylvania Conservancy
Southern Perry County Watershed Conservation Plan
BRC-‐RCP-‐11-‐6
$106,700 $80,000 11 Planning (RIV) $213,500 RIVER_Key
Perry Duncannon Borough Duncannon Area Park
KEY-‐PRD-‐5-‐50
$21,450 $21,400 5 Park Rehabilitation and Development (COMM)
$42,900 COMM_Key
Perry Duncannon Borough Peer-‐to-‐Peer KEY-‐TAG-‐4-‐2
$5,000 $5,000 4 Peer-‐to-‐Peer Tech. Assistance (COMM)
$5,500 COMM_Key
Perry Duncannon Borough River Access/Community Center/Welcome Center FS
BRC-‐RCI-‐9-‐7 $20,000 $20,000 9 Implementation (RIV)
$40,000 RIVER_Key
Perry Greenwood Township
Millerstown Area Community Park -‐ Phase I
BRC-‐PRD-‐13-‐370
$199,800 $100,000 13 Park Rehabilitation and Development (COMM)
$399,600 COMM_Key
Perry Greenwood Township
Millerstown Recreational Park
BRC-‐ACQ-‐11-‐177
$252,500 $120,000 11 Acquisition (COMM)
$504,500 COMM_Key
Perry Greenwood Township
Millerstown Recreational Park
BRC-‐TAG-‐11-‐210
$19,800 $19,800 11 Master Site Plans (COMM)
$39,600 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 459 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Perry Greenwood Township
Millertown Recreational Park Acquisition
BRC-‐ACQ-‐12-‐67
$39,900 $27,400 12 Acquisition (COMM)
$79,800 COMM_Key
Perry Howe Township Juniata River Park KEY-‐ACQ-‐3-‐93
$21,200 $21,000 3 Acquisition (COMM)
$42,500 COMM_Key
Perry Marysville Borough Lion's Club Park BRC-‐SC-‐10-‐88
$30,000 $30,000 10 Small Communities/Small Projects (COMM)
$40,000 COMM_Key
Perry Marysville Borough Lion's Club Park Renovation
BRC-‐PRD-‐12-‐169
$71,600 $71,600 12 Park Rehabilitation and Development (COMM)
$143,300 COMM_Key
Perry Marysville Borough Lion's Park Pool Feasibility Study
BRC-‐TAG-‐9-‐128
$8,000 $8,000 9 Feasibility Studies (COMM)
$16,000 COMM_Key
Perry Marysville Borough Mini Recreation and Park Plan
BRC-‐TAG-‐7-‐121
$5,500 $5,500 7 Comp. Rec., Park, & Open Space Plans (COMM)
$11,000 COMM_Key
Perry New Buffalo Borough
New Buffalo Park KEY-‐SC-‐3-‐151
$12,400 $12,400 3 Small Communities/Small Projects (COMM)
$13,600 COMM_Key
Perry Newport Borough Newport Riverwalk KEY-‐RTP-‐5-‐11
$6,500 $12,600 5 Feasibility Studies (RT)
$13,600 RT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 460 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Perry Newport Borough Newport Veterans Memorial Park-‐ Development
BRC-‐PRD-‐18-‐86
$110,618 $110,600 18 Park Rehabilitation and Development (COMM)
$221,236 COMM_Key
Perry Penn Township Township Park KEY-‐SC-‐3-‐164
$20,000 $20,000 3 Small Communities/Small Projects (COMM)
$67,000 COMM_Key
Perry Perry County Perry County Greenways, Open Space and Recreation Study
BRC-‐TAG-‐14-‐228
$40,000 $35,000 14 Greenway Plans (COMM)
$80,000 COMM_Key
Perry Rye Township Neal Graham Stager Memorial Playground
BRC-‐SC-‐8-‐164
$33,200 $33,000 8 Small Communities/Small Projects (COMM)
$46,400 COMM_Key
Perry SEDA-‐Council of Governments
Duncannon Apple Tree Alleywalk
BRC-‐TAG-‐13.3-‐492
$22,500 $22,500 13.3 Master Site Plans (COMM)
$45,000 COMM_Key
Perry Wheatfield Township
Hoverter Land Acquisition
BRC-‐ACQ-‐13-‐246
$121,600 $121,000 13 Acquisition (COMM)
$243,200 COMM_Key
Perry Wheatfield Township
Hoverter Land Acquisition, Phase 2
BRC-‐ACQ-‐14-‐73
$234,700 $234,000 14 Acquisition (COMM)
$469,300 COMM_Key
Perry Wheatfield Township
Wagner Community Park
BRC-‐SC-‐9-‐232
$40,000 $40,000 9 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 461 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Philadelphia Center City District Sister Cities Park-‐Development
BRC-‐PRD-‐16-‐127
$500,000 $500,000 16 Park Rehabilitation and Development (COMM)
$4,600,000 COMM_Key
Philadelphia Center City District Triangle Park BRC-‐PRD-‐13-‐94
$380,000 $380,000 13 Park Rehabilitation and Development (COMM)
$2,880,000 COMM_Key
Philadelphia Fairmount Park Commission
Bartram's Garden Trail Study and Master Site Plan
BRC-‐TAG-‐14-‐204
$60,000 $50,000 14 Trail Study (COMM)
$120,000 COMM_Key
Philadelphia Fairmount Park Commission
Benjamin Franklin Parkway
BRC-‐PRD-‐14-‐133
$450,000 $450,000 14 Park Rehabilitation and Development (COMM)
$5,500,000 COMM_Key
Philadelphia Fairmount Park Commission
Boxer Trail Phase II BRC-‐PRD-‐11-‐67
$340,100 $300,000 11 Park Rehabilitation and Development (COMM)
$681,400 COMM_Key
Philadelphia Fairmount Park Commission
Delaware River/Kensington & Tacony Trail
BRC-‐RTA-‐7-‐4
$402,000 $175,000 7 Acquisition (RT) $847,000 RT_Key
Philadelphia Fairmount Park Commission
DuPont Crescent Greenway
BRC-‐PRD-‐14-‐134
$500,000 $400,000 14 Park Rehabilitation and Development (COMM)
$3,780,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 462 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Philadelphia Fairmount Park Commission
East Fairmount Park & Wissahickon Watershed
BRC-‐PRD-‐7-‐70
$400,000 $377,000 7 Park Rehabilitation and Development (COMM)
$800,000 COMM_Key
Philadelphia Fairmount Park Commission
Hawthorne Park BRC-‐PRD-‐13.3-‐135
$1,000,000 $1,050,000 13.3 Park Rehabilitation and Development (COMM)
$2,016,500 COMM_Key
Philadelphia Fairmount Park Commission
Manayunk Recreation Trail
BRC-‐PRD-‐13.3-‐359
$906,000 $400,000 13.3 Park Rehabilitation and Development (COMM)
$1,812,000 COMM_Key
Philadelphia Fairmount Park Commission
Penn Treaty Park Master Site Plan
BRC-‐TAG-‐13.3-‐471
$22,500 $22,500 13.3 Master Site Plans (COMM)
$45,000 COMM_Key
Philadelphia Fairmount Park Commission
Pennypack on the Delaware-‐Support Buildings
BRC-‐PRD-‐6-‐61
$500,000 $200,000 6 Park Rehabilitation and Development (COMM)
$1,000,000 COMM_Key
Philadelphia Fairmount Park Commission
Tacony Creek Park BRC-‐PRD-‐14-‐137
$1,018,500 $200,000 14 Park Rehabilitation and Development (COMM)
$2,037,000 COMM_Key
Philadelphia Fairmount Park Commission
Waddington Tract BRC-‐ACQ-‐10-‐182
$350,000 $350,000 10 Acquisition (COMM)
$799,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 463 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Philadelphia Fairmount Park Commission
Wissahickon Valley Park
BRC-‐PRD-‐14-‐138
$150,000 $150,000 14 Park Rehabilitation and Development (COMM)
$300,000 COMM_Key
Philadelphia Natural Lands Trust, Inc.
Awbury Arboretum Conservation Easement
BRC-LTA-19-22
########## ########## 19 Open Space Acquisition (LT)
$2,857,500.00 LT_Key
Philadelphia Natural Lands Trust, Inc.
Awbury Arboretum Conservation Easement
BRC-LTA-19-22
########## ########## 19 Open Space Acquisition (LT)
$2,857,500.00 LT_Key
Philadelphia Natural Lands Trust, Inc.
Awbury Arboretum Conservation Easement
BRC-LTA-19-22
########## ########## 19 Open Space Acquisition (LT)
$2,857,500.00 LT_Key
Philadelphia Natural Lands Trust, Inc.
Citizens Bank Property Acquisition
BRC-LTA-19-23
$861,500.00 $861,500.00 19 Critical Habitat Acquisition (LT)
$1,723,000.00 LT_Key
Philadelphia Natural Lands Trust, Inc.
Citizens Bank Property Acquisition
BRC-LTA-19-23
$861,500.00 $861,500.00 19 Critical Habitat Acquisition (LT)
$1,723,000.00 LT_Key
Philadelphia Natural Lands Trust, Inc.
Citizens Bank Property Acquisition
BRC-LTA-19-23
$861,500.00 $861,500.00 19 Critical Habitat Acquisition (LT)
$1,723,000.00 LT_Key
Philadelphia Natural Lands Trust, Inc.
Roxborough Reservoir Conservation and Management Plan
BRC-‐LTP-‐17-‐15
$25,000 $25,000 17 Conservation/Sound Land Use (COMM)
$55,500 LT_Key
Philadelphia Natural Lands Trust, Inc.
Schuylkill Center Conservation Easement
BRC-‐LTA-‐13-‐32
$1,500,000 $750,000 13 Critical Habitat Acquisition (LT)
$40,963,400 LT_Key
Philadelphia Natural Lands Trust, Inc.
Sheet Metal Workers Union Property
BRC-LTA-19-26
$924,200.00 $674,000.00 19 Critical Habitat Acquisition (LT)
$1,848,400.00 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 464 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Philadelphia Natural Lands Trust, Inc.
Sheet Metal Workers Union Property
BRC-LTA-19-26
$924,200.00 $674,000.00 19 Critical Habitat Acquisition (LT)
$1,848,400.00 LT_Key
Philadelphia Natural Lands Trust, Inc.
Sheet Metal Workers Union Property
BRC-LTA-19-26
$924,200.00 $674,000.00 19 Critical Habitat Acquisition (LT)
$1,848,400.00 LT_Key
Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust
Comprehensive Neighborhood Garden Plan
BRC-LTP-19-151
$50,000.00 $50,000.00 19 Open Space Planning (LT)
$100,020.00 LT_Key
Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust
Comprehensive Neighborhood Garden Plan
BRC-LTP-19-151
$50,000.00 $50,000.00 19 Open Space Planning (LT)
$100,020.00 LT_Key
Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust
Comprehensive Neighborhood Garden Plan
BRC-LTP-19-151
$50,000.00 $50,000.00 19 Open Space Planning (LT)
$100,020.00 LT_Key
Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust
Comprehensive Neighborhood Garden Plan
BRC-LTP-19-151
$50,000.00 $50,000.00 19 Open Space Planning (LT)
$100,020.00 LT_Key
Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust
Comprehensive Neighborhood Garden Plan
BRC-LTP-19-151
$50,000.00 $50,000.00 19 Open Space Planning (LT)
$100,020.00 LT_Key
Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust
Comprehensive Neighborhood Garden Plan
BRC-LTP-19-151
$50,000.00 $50,000.00 19 Open Space Planning (LT)
$100,020.00 LT_Key
Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust
Comprehensive Neighborhood Garden Plan
BRC-LTP-19-151
$50,000.00 $50,000.00 19 Open Space Planning (LT)
$100,020.00 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 465 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust
Comprehensive Neighborhood Garden Plan
BRC-LTP-19-151
$50,000.00 $50,000.00 19 Open Space Planning (LT)
$100,020.00 LT_Key
Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust
Comprehensive Neighborhood Garden Plan
BRC-LTP-19-151
$50,000.00 $50,000.00 19 Open Space Planning (LT)
$100,020.00 LT_Key
Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust
Comprehensive Neighborhood Garden Plan
BRC-LTP-19-151
$50,000.00 $50,000.00 19 Open Space Planning (LT)
$100,020.00 LT_Key
Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust
Comprehensive Neighborhood Garden Plan
BRC-LTP-19-151
$50,000.00 $50,000.00 19 Open Space Planning (LT)
$100,020.00 LT_Key
Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust
Comprehensive Neighborhood Garden Plan
BRC-LTP-19-151
$50,000.00 $50,000.00 19 Open Space Planning (LT)
$100,020.00 LT_Key
Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust
Comprehensive Neighborhood Garden Plan
BRC-LTP-19-151
$50,000.00 $50,000.00 19 Open Space Planning (LT)
$100,020.00 LT_Key
Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust
Comprehensive Neighborhood Garden Plan
BRC-LTP-19-151
$50,000.00 $50,000.00 19 Open Space Planning (LT)
$100,020.00 LT_Key
Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust
Comprehensive Neighborhood Garden Plan
BRC-LTP-19-151
$50,000.00 $50,000.00 19 Open Space Planning (LT)
$100,020.00 LT_Key
Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust
Comprehensive Neighborhood Garden Plan
BRC-LTP-19-151
$50,000.00 $50,000.00 19 Open Space Planning (LT)
$100,020.00 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 466 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust
Comprehensive Neighborhood Garden Plan
BRC-LTP-19-151
$50,000.00 $50,000.00 19 Open Space Planning (LT)
$100,020.00 LT_Key
Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust
Comprehensive Neighborhood Garden Plan
BRC-LTP-19-151
$50,000.00 $50,000.00 19 Open Space Planning (LT)
$100,020.00 LT_Key
Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust
Comprehensive Neighborhood Garden Plan
BRC-LTP-19-151
$50,000.00 $50,000.00 19 Open Space Planning (LT)
$100,020.00 LT_Key
Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust
Comprehensive Neighborhood Garden Plan
BRC-LTP-19-151
$50,000.00 $50,000.00 19 Open Space Planning (LT)
$100,020.00 LT_Key
Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust
Comprehensive Neighborhood Garden Plan
BRC-LTP-19-151
$50,000.00 $50,000.00 19 Open Space Planning (LT)
$100,020.00 LT_Key
Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust
Comprehensive Neighborhood Garden Plan
BRC-LTP-19-151
$50,000.00 $50,000.00 19 Open Space Planning (LT)
$100,020.00 LT_Key
Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust
Comprehensive Neighborhood Garden Plan
BRC-LTP-19-151
$50,000.00 $50,000.00 19 Open Space Planning (LT)
$100,020.00 LT_Key
Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust
Comprehensive Neighborhood Garden Plan
BRC-LTP-19-151
$50,000.00 $50,000.00 19 Open Space Planning (LT)
$100,020.00 LT_Key
Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust
Comprehensive Neighborhood Garden Plan
BRC-LTP-19-151
$50,000.00 $50,000.00 19 Open Space Planning (LT)
$100,020.00 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 467 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust
Comprehensive Neighborhood Garden Plan
BRC-LTP-19-151
$50,000.00 $50,000.00 19 Open Space Planning (LT)
$100,020.00 LT_Key
Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust
Comprehensive Neighborhood Garden Plan
BRC-LTP-19-151
$50,000.00 $50,000.00 19 Open Space Planning (LT)
$100,020.00 LT_Key
Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust
Comprehensive Neighborhood Garden Plan
BRC-LTP-19-151
$50,000.00 $50,000.00 19 Open Space Planning (LT)
$100,020.00 LT_Key
Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust
Comprehensive Neighborhood Garden Plan
BRC-LTP-19-151
$50,000.00 $50,000.00 19 Open Space Planning (LT)
$100,020.00 LT_Key
Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust
Comprehensive Neighborhood Garden Plan
BRC-LTP-19-151
$50,000.00 $50,000.00 19 Open Space Planning (LT)
$100,020.00 LT_Key
Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust
Comprehensive Neighborhood Garden Plan
BRC-LTP-19-151
$50,000.00 $50,000.00 19 Open Space Planning (LT)
$100,020.00 LT_Key
Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust
Comprehensive Neighborhood Garden Plan
BRC-LTP-19-151
$50,000.00 $50,000.00 19 Open Space Planning (LT)
$100,020.00 LT_Key
Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust
Comprehensive Neighborhood Garden Plan
BRC-LTP-19-151
$50,000.00 $50,000.00 19 Open Space Planning (LT)
$100,020.00 LT_Key
Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust
Comprehensive Neighborhood Garden Plan
BRC-LTP-19-151
$50,000.00 $50,000.00 19 Open Space Planning (LT)
$100,020.00 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 468 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust
Comprehensive Neighborhood Garden Plan
BRC-LTP-19-151
$50,000.00 $50,000.00 19 Open Space Planning (LT)
$100,020.00 LT_Key
Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust
Comprehensive Neighborhood Garden Plan
BRC-LTP-19-151
$50,000.00 $50,000.00 19 Open Space Planning (LT)
$100,020.00 LT_Key
Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust
Comprehensive Neighborhood Garden Plan
BRC-LTP-19-151
$50,000.00 $50,000.00 19 Open Space Planning (LT)
$100,020.00 LT_Key
Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust
Comprehensive Neighborhood Garden Plan
BRC-LTP-19-151
$50,000.00 $50,000.00 19 Open Space Planning (LT)
$100,020.00 LT_Key
Philadelphia Pennsylvania Environmental Council, Inc.
Delaware Riverfront Trail Connections Program
BRC-‐RCI-‐12-‐12
$150,000 $150,000 12 Implementation (RIV)
$300,000 RIVER_Key
Philadelphia Philadelphia Authority for Industrial Development
Navy Yard Riverfront Greenway
BRC-‐PRD-‐11-‐66
$622,500 $250,000 11 Park Rehabilitation and Development (COMM)
$1,245,000 COMM_Key
Philadelphia Philadelphia City Allens Lane Park and Belmont Grove
KEY-‐PRD-‐4-‐126
$400,000 $400,000 4 Park Rehabilitation and Development (COMM)
$800,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 469 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Philadelphia Philadelphia City Cedar, Pleasant Hill and Three Bears Parks
BRC-‐PRD-‐12-‐185
$1,187,500 $600,000 12 Park Rehabilitation and Development (COMM)
$2,375,000 COMM_Key
Philadelphia Philadelphia City City Playgrounds/Fairmount Park Path
KEY-‐PRD-‐1-‐107
$600,000 $275,000 1 Park Rehabilitation and Development (COMM)
$1,200,000 COMM_Key
Philadelphia Philadelphia City Clark, Connell, Jefferson & Pulaski Parks
BRC-‐PRD-‐11-‐68
$400,000 $400,000 11 Park Rehabilitation and Development (COMM)
$800,000 COMM_Key
Philadelphia Philadelphia City Cobbs Creek Trail - 70th Street to Woodland Avenue - Development
BRC-PRD-19-102
$275,000.00 $275,000.00 19 Park Rehabilitation and Development (COMM)
$595,000.00 COMM_Key
Philadelphia Philadelphia City Cobbs Creek Trail - 70th Street to Woodland Avenue - Development
BRC-PRD-19-102
$275,000.00 $275,000.00 19 Park Rehabilitation and Development (COMM)
$595,000.00 COMM_Key
Philadelphia Philadelphia City Cobbs Creek Trail - 70th Street to Woodland Avenue - Development
BRC-PRD-19-102
$275,000.00 $275,000.00 19 Park Rehabilitation and Development (COMM)
$595,000.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 470 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Philadelphia Philadelphia City Delaware and Allegheny Greenway
BRC-‐PRD-‐14-‐163
$260,000 $200,000 14 Park Rehabilitation and Development (COMM)
$2,871,000 COMM_Key
Philadelphia Philadelphia City Dickinson Square Park
BRC-‐PRD-‐14-‐162
$425,000 $300,000 14 Park Rehabilitation and Development (COMM)
$850,000 COMM_Key
Philadelphia Philadelphia City East Fairmount Park Stormwater Management Improvements
BRC-‐PRD-‐16-‐247
$300,000 $250,000 16 Park Rehabilitation and Development (COMM)
$600,000 COMM_Key
Philadelphia Philadelphia City Ingersoll Park-‐Development
BRC-‐PRD-‐18-‐90
$438,002 $438,000 18 Park Rehabilitation and Development (COMM)
$876,005 COMM_Key
Philadelphia Philadelphia City Julian Abele Park-‐Development
BRC-‐PRD-‐15-‐68
$134,000 $75,000 15 Park Rehabilitation and Development (COMM)
$268,000 COMM_Key
Philadelphia Philadelphia City Lonnie Young Recreation Center
KEY-‐PRD-‐4-‐125
$400,000 $800,000 4 Park Rehabilitation and Development (COMM)
$800,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 471 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Philadelphia Philadelphia City Mt. Airy, Parkside, Sturgis Playgrounds, Brewerytown Rec.
BRC-‐PRD-‐13-‐134
$600,000 $530,000 13 Park Rehabilitation and Development (COMM)
$1,200,000 COMM_Key
Philadelphia Philadelphia City Neighborhood Park Rehab. -‐ Phase II
BRC-‐PRD-‐8-‐152
$1,100,000 $500,000 8 Park Rehabilitation and Development (COMM)
$2,200,000 COMM_Key
Philadelphia Philadelphia City Neighborhood Parks Revitalization
BRC-‐PRD-‐7-‐154
$1,000,000 $1,000,000 7 Park Rehabilitation and Development (COMM)
$3,715,000 COMM_Key
Philadelphia Philadelphia City Penn Treaty Park - Phase 1-Development
BRC-PRD-19-103
$100,000.00 $100,000.00 19 Park Rehabilitation and Development (COMM)
$300,000.00 COMM_Key
Philadelphia Philadelphia City Penn Treaty Park - Phase 1-Development
BRC-PRD-19-103
$100,000.00 $100,000.00 19 Park Rehabilitation and Development (COMM)
$300,000.00 COMM_Key
Philadelphia Philadelphia City Penn Treaty Park - Phase 1-Development
BRC-PRD-19-103
$100,000.00 $100,000.00 19 Park Rehabilitation and Development (COMM)
$300,000.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 472 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Philadelphia Philadelphia City Pennypack Trail KEY-‐PRD-‐2-‐121
$750,000 $750,000 2 Park Rehabilitation and Development (COMM)
$1,500,000 COMM_Key
Philadelphia Philadelphia City Philadelphia City -‐ Recreation Areas
BRC-‐PRD-‐10-‐133
$1,200,000 $300,000 10 Park Rehabilitation and Development (COMM)
$2,400,000 COMM_Key
Philadelphia Philadelphia City Philadelphia Comprehensive Open Space Plan
BRC-‐TAG-‐11-‐261
$300,000 $325,000 11 Comp. Rec., Park, & Open Space Plans (COMM)
$650,000 COMM_Key
Philadelphia Philadelphia City Pleasant Hill Park -‐ Development
BRC-‐PRD-‐17-‐146
$347,000 $318,000 17 Park Rehabilitation and Development (COMM)
$694,000 COMM_Key
Philadelphia Philadelphia City Pleasant Hill Park Plan
BRC-‐TAG-‐9-‐165
$50,000 $50,000 9 Master Site Plans (COMM)
$100,000 COMM_Key
Philadelphia Philadelphia City Poquessing Creek Trail -‐ Development
BRC-‐PRD-‐18-‐91
$500,000 $500,000 18 Park Rehabilitation and Development (COMM)
$1,090,578 COMM_Key
Philadelphia Philadelphia City Pulaski Park - Phase 3 - Development
BRC-PRD-19-104
$500,000.00 $500,000.00 19 Park Rehabilitation and Development (COMM)
$1,000,000.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 473 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Philadelphia Philadelphia City Pulaski Park - Phase 3 - Development
BRC-PRD-19-104
$500,000.00 $500,000.00 19 Park Rehabilitation and Development (COMM)
$1,000,000.00 COMM_Key
Philadelphia Philadelphia City Pulaski Park - Phase 3 - Development
BRC-PRD-19-104
$500,000.00 $500,000.00 19 Park Rehabilitation and Development (COMM)
$1,000,000.00 COMM_Key
Philadelphia Philadelphia City Pulaski Park - Phase 3 - Development
BRC-PRD-19-104
$500,000.00 $500,000.00 19 Park Rehabilitation and Development (COMM)
$1,000,000.00 COMM_Key
Philadelphia Philadelphia City Schuylkill Recreation Path
BRC-‐PRD-‐6-‐145
$400,000 $400,000 6 Park Rehabilitation and Development (COMM)
$800,000 COMM_Key
Philadelphia Philadelphia City Schuylkill Recreation Pathway
KEY-‐PRD-‐5-‐159
$400,000 $820,000 5 Park Rehabilitation and Development (COMM)
$800,000 COMM_Key
Philadelphia Philadelphia City Schuylkill River Trail - Grays Ferry Bridge - Development
BRC-PRD-19-112
$500,000.00 $300,000.00 19 Park Rehabilitation and Development (COMM)
$8,595,050.00 COMM_Key
Philadelphia Philadelphia City Schuylkill River Trail - Grays Ferry Bridge - Development
BRC-PRD-19-112
$500,000.00 $300,000.00 19 Park Rehabilitation and Development (COMM)
$8,595,050.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 474 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Philadelphia Philadelphia City Schuylkill River Trail - Grays Ferry Bridge - Development
BRC-PRD-19-112
$500,000.00 $300,000.00 19 Park Rehabilitation and Development (COMM)
$8,595,050.00 COMM_Key
Philadelphia Philadelphia City Schuylkill River Trail - Grays Ferry Bridge - Development
BRC-PRD-19-112
$500,000.00 $300,000.00 19 Park Rehabilitation and Development (COMM)
$8,595,050.00 COMM_Key
Philadelphia Philadelphia City Schuylkill River Trail -‐ South Street to Christian Street -‐ Development
BRC-‐PRD-‐18-‐97
$225,000 $225,000 18 Park Rehabilitation and Development (COMM)
$1,196,083 COMM_Key
Philadelphia Philadelphia City Seven Recreation Sites
BRC-‐PRD-‐9-‐166
$525,000 $500,000 9 Park Rehabilitation and Development (COMM)
$1,050,000 COMM_Key
Philadelphia Philadelphia City Shevchenko Park-‐Development
BRC-‐PRD-‐16-‐154
$350,000 $300,000 16 Park Rehabilitation and Development (COMM)
$728,000 COMM_Key
Philadelphia Philadelphia City Six Sites BRC-‐PRD-‐13.3-‐608
$1,250,000 $1,000,000 13.3 Park Rehabilitation and Development (COMM)
$2,805,000 COMM_Key
Philadelphia Philadelphia City South Schuylkill Property Acquisition
BRC-‐ACQ-‐17-‐224
$250,000 $200,000 17 Acquisition (COMM)
$500,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 475 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Philadelphia Philadelphia City Swimming Pools Rehabilitation
KEY-‐PRD-‐3-‐171
$380,000 $360,000 3 Park Rehabilitation and Development (COMM)
$1,520,000 COMM_Key
Philadelphia Philadelphia City Three Sites -‐ Development
BRC-‐PRD-‐18-‐199
$800,000 $800,000 17 Park Rehabilitation and Development (COMM)
$4,800,007 COMM_Key
Philadelphia Philadelphia City Weccacoe Park-‐ Development
BRC-‐PRD-‐18-‐92
$250,000 $194,400 18 Park Rehabilitation and Development (COMM)
$750,000 COMM_Key
Philadelphia Philadelphia City Wissahickon Creek Conservation Plan
KEY-‐RCP-‐95-‐12
$50,000 $50,000 1 Planning (RIV) $100,000 RIVER_Key
Philadelphia Philadelphia Department of Commerce
Tidal Schuylkill River Greenway Trail
BRC-‐PRD-‐9-‐167
$800,000 $500,000 9 Park Rehabilitation and Development (COMM)
$2,300,000 COMM_Key
Philadelphia Philadelphia Water Department
Delaware Watershed Conservation and Public Access Plan
BRC-‐RCP-‐12-‐13
$170,000 $70,000 12 Planning (RIV) $340,000 COMM_Key
Philadelphia Philadelphia Water Department
Delaware Watershed Conservation and Public Access Plan
BRC-‐RCP-‐12-‐13
$170,000 $100,000 12 Planning (RIV) $340,000 RIVER_Key
Keystone Fund Projects by County (1994-‐2013)
Page 476 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Philadelphia Philadelphia Water Department
Fairmount Dam Fish Ladder
BRC-‐RCD-‐13.3-‐549
$200,000 $200,000 13.3 Development (RIV)
$2,400,000 RIVER_Key
Philadelphia Philadelphia Water Department
Interpretive Center BRC-‐RCD-‐7-‐13
$243,537 $240,000 7 Development (RIV)
$2,647,484 RIVER_Key
Philadelphia Philadelphia Water Department
Liberty Lands Park BRC-‐PRD-‐13.3-‐411
$135,000 $135,000 13.3 Park Rehabilitation and Development (COMM)
$311,000 COMM_Key
Philadelphia Philadelphia Water Department
Tacony-‐Frankford Watershed
BRC-‐RCP-‐7-‐14
$100,000 $100,000 7 Planning (RIV) $274,700 RIVER_Key
Philadelphia Philadelphia Water Department
Waterwork Impervious Surfaces Study
BRC-‐TAG-‐13.3-‐230
$150,000 $100,000 13.3 Master Site Plans (COMM)
$300,000 COMM_Key
Philadelphia Resources for Human Development, Inc.
Kitchens Lane Stewardship Project
BRC-‐RCD-‐8-‐2
$29,000 $29,000 8 Development (RIV)
$58,300 RIVER_Key
Philadelphia Schuylkill River Development Corporation
Schuylkill River Trail KEY-‐RTD-‐4-‐20
$200,000 $100,000 4 Rail Rehabilitation and Development (RT)
$4,113,230 RT_Key
Philadelphia The Free Library of Philadelphia
Central Library Green Roof
BRC-‐PRD-‐13.3-‐174
$2,465,200 $50,000 13.3 Park Rehabilitation and Development (COMM)
$4,930,500 COMM_Key
Philadelphia Zoological Society of Philadelphia
Philadelphia Zoo -‐ Primate Center
KEY-‐ZOO-‐94-‐4
$1,400,000 $1,400,000 1 Zoo $2,800,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 477 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Pike Delaware Highlands Conservancy
Beaver Run Hunting and Fishing Club Easement
BRC-‐LTA-‐17-‐217
$1,107,300 $550,000 17 Open Space Acquisition (LT)
$2,217,300 LT_Key
Pike Delaware Highlands Conservancy
Camp Speers Eljabar Easement
BRC-‐LTA-‐13-‐33
$741,500 $740,000 13 Open Space Acquisition (LT)
$1,483,000 LT_Key
Pike Delaware Highlands Conservancy
Pike County Greenway Acquisition
BRC-‐LTA-‐8-‐5
$901,500 $384,000 8 Open Space Acquisition (LT)
$1,815,000 LT_Key
Pike Delaware Township Camp Akenac Acquisition
BRC-‐ACQ-‐13-‐249
$406,600 $350,000 13 Acquisition (COMM)
$813,200 COMM_Key
Pike Delaware Township Township Park KEY-‐SC-‐1-‐37 $20,000 $20,000 1 Small Communities/Small Projects (COMM)
$25,269 COMM_Key
Pike Dingman Township Bridge Preserve Master Site Plan
BRC-‐TAG-‐14-‐197
$27,000 $27,000 14 Master Site Plans (COMM)
$54,000 COMM_Key
Pike Dingman Township Municipal Park Acquisition
BRC-‐ACQ-‐9-‐62
$147,600 $140,000 9 Acquisition (COMM)
$295,200 COMM_Key
Pike Dingman Township Township Park BRC-‐PRD-‐13.3-‐350
$400,000 $200,000 13.3 Park Rehabilitation and Development (COMM)
$825,600 COMM_Key
Pike Lackawaxen Township
Lackawaxen Township Conservation Plan for Recreational Park
BRC-‐TAG-‐16-‐248
$19,542 $19,500 16 Master Site Plans (COMM)
$39,084 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 478 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Pike Lackawaxen Township
Shook Land Acquisition
BRC-‐LTA-‐16-‐235
$355,642 $355,000 16 Acquisition (COMM)
$711,284 COMM_Key
Pike Lehman Township Community Park -‐ Development
BRC-‐PRD-‐13-‐383
$300,000 $200,000 13 Park Rehabilitation and Development (COMM)
$600,000 COMM_Key
Pike Lehman Township Community Park Acquisition
BRC-‐ACQ-‐11-‐178
$461,500 $200,000 11 Acquisition (COMM)
$923,000 COMM_Key
Pike Lehman Township Community Park Master Plan
BRC-‐TAG-‐11-‐217
$34,807 $35,000 11 Master Site Plans (COMM)
$69,614 COMM_Key
Pike Lehman Township Lehman Township Community Park -‐ Special Study
BRC-‐TAG-‐12-‐244
$20,000 $20,000 12 Feasibility Studies (COMM)
$40,000 COMM_Key
Pike Matamoras Borough Airport Park BRC-‐PRD-‐13.3-‐392
$50,000 $50,000 13.3 Park Rehabilitation and Development (COMM)
$100,000 COMM_Key
Pike Matamoras Borough MacDonald Property KEY-‐ACQ-‐3-‐129
$24,000 $24,000 3 Acquisition (COMM)
$48,000 COMM_Key
Pike Matamoras Borough Matamoras Airport Park
BRC-‐TAG-‐7-‐122
$13,000 $13,000 7 Master Site Plans (COMM)
$26,000 COMM_Key
Pike Milford Borough Milford Borough Skatepark Development
BRC-‐SC-‐12-‐109
$30,000 $30,000 12 Small Communities/Small Projects (COMM)
$40,000 COMM_Key
Pike Municipal Authority of the Borough of Milford
Sawkill Creek Watershed
BRC-‐ACQ-‐11-‐181
$156,500 $82,700 11 Acquisition (COMM)
$418,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 479 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Pike Palmyra Township Park Pavillion BRC-‐SC-‐8-‐142
$20,000 $20,000 8 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Pike Palmyra Township Township Park KEY-‐SC-‐4-‐121
$20,000 $20,000 4 Small Communities/Small Projects (COMM)
$25,380 COMM_Key
Pike Pike County Forecasting Land Use Change
BRC-‐TAG-‐11.5-‐31
$25,000 $25,000 11.5 Conservation/Sound Land Use (COMM)
$62,200 COMM_Key
Pike Pike County Lackawaxen-‐Shohola Open Space, Greenway and Rec Plan
BRC-‐TAG-‐13-‐201
$27,500 $27,500 13 Comp. Rec., Park, & Open Space Plans (COMM)
$55,000 COMM_Key
Pike Pike County Lackawaxen-‐Upper Delaware River Greenways Plan
BRC-‐TAG-‐18-‐143
$30,100 $30,100 18 Greenway Plans (COMM)
$61,435 COMM_Key
Pike Pike County Matamoras Borough & Westfall Township Rec. & Greenway Plan
BRC-‐TAG-‐14-‐231
$30,000 $30,000 14 Comp. Rec., Park, & Open Space Plans (COMM)
$90,000 COMM_Key
Pike Pike County Open Space Greenways & Recreation Plan
BRC-‐TAG-‐11-‐232
$49,000 $45,000 11 Greenway Plans (COMM)
$98,000 COMM_Key
Pike Pike County Park Master Site Plan
KEY-‐TAG-‐4-‐127
$9,900 $9,900 4 Master Site Plans (COMM)
$19,800 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 480 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Pike Pike County Peer-‐to-‐Peer KEY-‐TAG-‐6-‐2
$7,500 $7,500 6 Peer-‐to-‐Peer Tech. Assistance (COMM)
$8,250 COMM_Key
Pike Pike County Pike County Land Investment Acquisition
BRC-‐ACQ-‐18-‐8
$842,500 $819,000 18 Acquisition (COMM)
$1,685,000 COMM_Key
Pike Pike County Pike County Scenic Rural Character Preservation Bond Support
BRC-‐TAG-‐14-‐232
$30,000 $30,000 14 Education and Training (COMM)
$60,000 COMM_Key
Pike Pike County Pinchot Greenway-‐Feasibility Study & Master Plan
BRC-‐TAG-‐8-‐155
$135,000 $30,000 8 Greenway Plans (COMM)
$270,000 COMM_Key
Pike Pike County Rock Hill Land Acquisition
BRC-‐ACQ-‐17-‐99
$1,725,000 $1,126,000 17 Acquisition (COMM)
$3,450,000 COMM_Key
Pike Pike County Sawkill Creek-‐Vandermark Creek Watershed Plan
KEY-‐RCP-‐5-‐6
$35,000 $35,000 5 Planning (RIV) $71,000 RIVER_Key
Pike Shohola Township Rohman Park BRC-‐PRD-‐13-‐142
$88,500 $88,000 13 Park Rehabilitation and Development (COMM)
$177,000 COMM_Key
Pike Shohola Township Rohman Park KEY-‐PRD-‐5-‐182
$54,000 $54,000 5 Park Rehabilitation and Development (COMM)
$108,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 481 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Pike Shohola Township Rohman Park-‐Phase 2-‐Development
BRC-‐PRD-‐18-‐100
$94,146 $94,000 18 Park Rehabilitation and Development (COMM)
$191,584 COMM_Key
Pike The Nature Conservancy
Upper Delaware Corridor Protection Plan
BRC-‐RCI-‐11-‐15
$56,300 $50,000 11 Implementation (RIV)
$112,500 RIVER_Key
Pike Trust for Public Land KD Land Acquisition BRC-‐LTA-‐17-‐61
$600,000 $600,000 17 Open Space Acquisition (LT)
$1,200,000 LT_Key
Pike Trust for Public Land Milford Reservation Acquisition
KEY-‐LTA-‐2-‐16
$400,000 $500,000 2 Open Space Acquisition (LT)
$1,000,000 LT_Key
Pike Wildlands Conservancy, Inc.
Checho Property BRC-‐LTA-‐6-‐24
$239,400 $200,000 6 Critical Habitat Acquisition (LT)
$919,400 LT_Key
Potter Austin Borough Austin Dam Mem. Park & Bayless Papermill Master Site Plan
BRC-‐TAG-‐14-‐192
$30,500 $30,500 14 Master Site Plans (COMM)
$61,000 COMM_Key
Potter Austin Borough Baseball and Multi-‐purpose Fields
BRC-‐PRD-‐8-‐19
$55,000 $55,000 8 Park Rehabilitation and Development (COMM)
$110,000 COMM_Key
Potter Coudersport Borough
Borough Pool Feasibility Study
BRC-‐TAG-‐13-‐181
$12,500 $12,500 13 Feasibility Studies (COMM)
$25,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 482 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Potter Galeton Borough Galeton Park-‐ Phase I (AKA) Centertown Park or John Collins Memorial Park-‐ Development
BRC-‐PRD-‐12-‐155
$99,000 $99,000 12 Park Rehabilitation and Development (COMM)
$180,000 COMM_Key
Potter Potter County North Fork Park KEY-‐ACQ-‐4-‐130
$42,500 $40,000 4 Acquisition (COMM)
$85,000 COMM_Key
Potter Potter County Northfork Master Plan
BRC-‐TAG-‐7-‐157
$10,260 $10,000 7 Master Site Plans (COMM)
$20,520 COMM_Key
Potter Roulette Township Skate Park BRC-‐SC-‐11-‐152
$40,000 $40,000 11 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Potter Shinglehouse Borough
Assembly Park BRC-‐SC-‐6-‐166
$20,000 $20,000 6 Small Communities/Small Projects (COMM)
$21,200 COMM_Key
Potter Shinglehouse Borough
Assembly Park KEY-‐SC-‐1-‐126
$18,900 $18,900 1 Small Communities/Small Projects (COMM)
$19,900 COMM_Key
Schuylkill Ashland Borough Higher-‐Up Park Tot Lot Area Renovation
BRC-‐SC-‐12-‐80
$30,000 $30,000 12 Small Communities/Small Projects (COMM)
$42,000 COMM_Key
Schuylkill Ashland Borough Master Site Plans -‐ 3 Parks
BRC-‐TAG-‐9-‐12
$30,000 $30,000 9 Master Site Plans (COMM)
$60,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 483 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Schuylkill Branch Township Llewellyn Community Park
KEY-‐SC-‐1-‐18 $18,650 $18,600 1 Small Communities/Small Projects (COMM)
$18,650 COMM_Key
Schuylkill Branch Township Westwest Terrace Playground
KEY-‐SC-‐5-‐21 $20,000 $20,000 5 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Schuylkill Butler Township Locustdale Rec. Area Master Plan
KEY-‐TAG-‐5-‐26
$11,000 $11,000 5 Master Site Plans (COMM)
$22,000 COMM_Key
Schuylkill Cass Township Forestville Park-‐ Development
BRC-‐SC-‐18-‐27
$40,000 $40,000 18 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Schuylkill Cass Township Forestville Playground
BRC-‐SC-‐14-‐78
$40,000 $40,000 14 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Schuylkill Cass Township Forestville Playground Improvements
BRC-‐SC-‐12-‐86
$40,000 $40,000 12 Small Communities/Small Projects (COMM)
$70,000 COMM_Key
Schuylkill Cass Township Heckscherville Playground
BRC-‐SC-‐6-‐31
$20,000 $20,000 6 Small Communities/Small Projects (COMM)
$30,000 COMM_Key
Schuylkill Cass Township Heckscherville Playground -‐ Development
BRC-‐SC-‐17-‐30
$40,000 $40,000 17 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 484 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Schuylkill Coaldale Borough Ridge Terrace Walking Track
BRC-‐SC-‐10-‐73
$27,000 $27,000 10 Small Communities/Small Projects (COMM)
$34,000 COMM_Key
Schuylkill East Brunswick Township
Park Land Acquisition
BRC-‐ACQ-‐14-‐54
$26,600 $26,100 14 Acquisition (COMM)
$53,200 COMM_Key
Schuylkill East Brunswick Township
South Schuylkill Comprehensive Park, Recreation, Open Space,
BRC-TAG-19-131
$50,000.00 $50,000.00 19 Comp. Rec., Park, & Open Space Plans (COMM)
$100,000.00 COMM_Key
Schuylkill East Brunswick Township
South Schuylkill Comprehensive Park, Recreation, Open Space,
BRC-TAG-19-131
$50,000.00 $50,000.00 19 Comp. Rec., Park, & Open Space Plans (COMM)
$100,000.00 COMM_Key
Schuylkill East Brunswick Township
South Schuylkill Comprehensive Park, Recreation, Open Space,
BRC-TAG-19-131
$50,000.00 $50,000.00 19 Comp. Rec., Park, & Open Space Plans (COMM)
$100,000.00 COMM_Key
Schuylkill East Brunswick Township
South Schuylkill Comprehensive Park, Recreation, Open Space,
BRC-TAG-19-131
$50,000.00 $50,000.00 19 Comp. Rec., Park, & Open Space Plans (COMM)
$100,000.00 COMM_Key
Schuylkill East Brunswick Township
Township Park -‐ Development
BRC-‐SC-‐16-‐41
$40,000 $40,000 16 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Schuylkill East Norwegian Township
Schoentown Sporting Complex – Development
BRC-SC-19-40
$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)
$60,000.00 COMM_Key
Schuylkill East Norwegian Township
Schoentown Sporting Complex – Development
BRC-SC-19-40
$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)
$60,000.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 485 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Schuylkill East Norwegian Township
Schoentown Sporting Complex – Development
BRC-SC-19-40
$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)
$60,000.00 COMM_Key
Schuylkill Eastern Schuylkill Recreation Commission
Peer-‐to-‐Peer BRC-‐TAG-‐6-‐7
$7,500 $7,500 6 Peer-‐to-‐Peer Tech. Assistance (COMM)
$8,250 COMM_Key
Schuylkill Eastern Schuylkill Recreation Commission
Schuylkill Valley Heritage Trail
BRC-‐RTD-‐6-‐7
$160,000 $160,000 6 Rail Rehabilitation and Development (RT)
$320,000 RT_Key
Schuylkill Eastern Schuylkill Recreation Commission
West Penn Park East Master Plan
KEY-‐TAG-‐5-‐58
$12,500 $12,500 5 Master Site Plans (COMM)
$25,000 COMM_Key
Schuylkill Foster Township Community Park KEY-‐SC-‐5-‐67 $20,000 $20,000 5 Small Communities/Small Projects (COMM)
$22,000 COMM_Key
Schuylkill Foster Township Community Park -‐ Development
BRC-‐SC-‐17-‐37
$40,000 $40,000 17 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Schuylkill Foster Township Community Park Improvements
BRC-‐SC-‐7-‐76
$40,000 $30,000 7 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 486 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Schuylkill Foster Township Foster Township Community Park Enhancement
BRC-‐SC-‐12-‐96
$40,000 $40,000 12 Small Communities/Small Projects (COMM)
$80,200 COMM_Key
Schuylkill Foster Township Hill Area Park BRC-‐SC-‐14-‐86
$40,000 $40,000 14 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Schuylkill Frackville Borough Arch Street Park BRC-‐SC-‐9-‐79
$28,400 $28,000 9 Small Communities/Small Projects (COMM)
$36,700 COMM_Key
Schuylkill Frackville Borough Little League Park BRC-‐SC-‐14-‐87
$23,000 $23,000 14 Small Communities/Small Projects (COMM)
$26,000 COMM_Key
Schuylkill Frackville Borough Little League Park -‐ Skateboard Facility
BRC-‐SC-‐11-‐124
$23,000 $23,000 11 Small Communities/Small Projects (COMM)
$29,300 COMM_Key
Schuylkill Frackville Borough Memorial Park KEY-‐PRD-‐3-‐69
$30,000 $30,000 3 Park Rehabilitation and Development (COMM)
$72,000 COMM_Key
Schuylkill Frailey Township Frailey Township Park-‐ Development
BRC-‐SC-‐18-‐32
$40,000 $40,000 18 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 487 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Schuylkill Girardville Borough East End Recreation Area
KEY-‐SC-‐3-‐73 $20,000 $20,000 3 Small Communities/Small Projects (COMM)
$21,000 COMM_Key
Schuylkill Girardville Borough West End Public Rec. Area -‐ Phase III
BRC-‐SC-‐8-‐77
$31,000 $31,000 8 Small Communities/Small Projects (COMM)
$42,000 COMM_Key
Schuylkill Girardville Borough West End Public Recreation-‐Phase II
BRC-‐SC-‐7-‐78
$30,000 $30,000 7 Small Communities/Small Projects (COMM)
$40,000 COMM_Key
Schuylkill Girardville Borough West End Recreation Area -‐ Phase I
BRC-‐SC-‐6-‐73
$20,000 $20,000 6 Small Communities/Small Projects (COMM)
$27,000 COMM_Key
Schuylkill Hawk Mountain Sanctuary Association
Bachkai Parcel Acquisition
BRC-‐LTA-‐13-‐34
$35,000 $35,000 13 Critical Habitat Acquisition (LT)
$70,000 LT_Key
Schuylkill Hawk Mountain Sanctuary Association
Hawk Mountain Resources Inventory
KEY-‐LTP-‐2-‐3 $44,650 $35,000 2 Critical Habitat Planning (LT)
$70,000 LT_Key
Schuylkill Mahanoy City Borough
East End Park Imporvements
BRC-‐SC-‐8-‐111
$25,000 $25,000 8 Small Communities/Small Projects (COMM)
$30,000 COMM_Key
Schuylkill Mahanoy City Borough
Fifth & Centre Park KEY-‐PRD-‐2-‐91
$10,000 $10,000 2 Park Rehabilitation and Development (COMM)
$20,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 488 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Schuylkill Mahanoy City Borough
North 8th Street Park -‐ Development
BRC-‐SC-‐17-‐44
$31,000 $31,000 17 Small Communities/Small Projects (COMM)
$42,000 COMM_Key
Schuylkill Mahanoy Township Parente Family Park -‐ Development
BRC-‐SC-‐17-‐45
$30,800 $31,000 17 Small Communities/Small Projects (COMM)
$48,000 COMM_Key
Schuylkill Mechanicsville Borough
Recreation Area BRC-‐SC-‐10-‐89
$40,000 $40,000 10 Small Communities/Small Projects (COMM)
$74,900 COMM_Key
Schuylkill Middleport Borough Community Park KEY-‐SC-‐2-‐99 $20,000 $20,000 2 Small Communities/Small Projects (COMM)
$29,250 COMM_Key
Schuylkill Middleport Borough Middleport Playground-‐Rehabilitation
BRC-‐SC-‐16-‐4
$40,000 $40,000 16 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Schuylkill Minersville Borough Delaware Avenue Complex
KEY-‐PRD-‐5-‐132
$33,500 $33,500 5 Park Rehabilitation and Development (COMM)
$67,000 COMM_Key
Schuylkill Minersville Borough Fourth Street Recreation Park
KEY-‐PRD-‐2-‐102
$30,000 $30,000 2 Park Rehabilitation and Development (COMM)
$65,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 489 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Schuylkill Minersville Borough Minersville Community Swimming Pool Renovation
BRC-‐PRD-‐12-‐173
$500,000 $400,000 12 Park Rehabilitation and Development (COMM)
$1,009,000 COMM_Key
Schuylkill Minersville Borough Minersville Pool -‐ Phase 2
BRC-‐PRD-‐13-‐607
$200,000 $100,000 13 Park Rehabilitation and Development (COMM)
$554,700 COMM_Key
Schuylkill New Ringgold Borough
Playground BRC-‐SC-‐10-‐91
$28,900 $28,000 10 Small Communities/Small Projects (COMM)
$37,800 COMM_Key
Schuylkill Northern Schuylkill Council of Governments
Northern Schuylkill Rails to Trails
BRC-‐RTP-‐7-‐9
$10,000 $10,000 7 Feasibility Studies (RT)
$20,000 RT_Key
Schuylkill Palo Alto Borough Bacon Street Park BRC-‐SC-‐10-‐93
$32,500 $40,000 10 Small Communities/Small Projects (COMM)
$45,000 COMM_Key
Schuylkill Palo Alto Borough Bacon Street Park Renovation Project
BRC-‐SC-‐8-‐143
$30,000 $30,000 8 Small Communities/Small Projects (COMM)
$40,000 COMM_Key
Schuylkill Pine Grove Borough Borough Park Master Site Plan
BRC-‐TAG-‐16-‐68
$10,000 $10,000 16 Master Site Plans (COMM)
$20,000 COMM_Key
Schuylkill Pine Grove Township Pine Grove Township Recreation Area - Development
BRC-SC-19-47
$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)
$60,000.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 490 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Schuylkill Pine Grove Township Pine Grove Township Recreation Area - Development
BRC-SC-19-47
$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)
$60,000.00 COMM_Key
Schuylkill Pine Grove Township Pine Grove Township Recreation Area - Development
BRC-SC-19-47
$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)
$60,000.00 COMM_Key
Schuylkill Pine Grove Township
Recreation Area BRC-‐SC-‐14-‐102
$40,000 $40,000 14 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Schuylkill Port Carbon Borough
Francis Lubinsky Park-‐ Phase 2-‐ Development
BRC-‐SC-‐18-‐38
$40,000 $40,000 18 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Schuylkill Port Carbon Borough
Mirawall Playground BRC-‐SC-‐11-‐150
$39,500 $40,000 11 Small Communities/Small Projects (COMM)
$91,800 COMM_Key
Schuylkill Pottsville City General George A. Joulwan (Eastside) Park
BRC-‐TAG-‐6-‐154
$7,500 $7,500 6 Master Site Plans (COMM)
$15,000 COMM_Key
Schuylkill Pottsville City JFK Pool KEY-‐PRD-‐5-‐168
$175,000 $150,000 5 Park Rehabilitation and Development (COMM)
$350,000 COMM_Key
Schuylkill Pottsville City JFK Pool Feasibility Study
KEY-‐TAG-‐3-‐181
$2,500 $2,500 3 Feasibility Studies (COMM)
$5,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 491 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Schuylkill Pottsville City Joulwan Park BRC-‐PRD-‐11-‐256
$307,800 $300,000 11 Park Rehabilitation and Development (COMM)
$615,600 COMM_Key
Schuylkill Pottsville City Pottsville Playgrounds
BRC-‐PRD-‐7-‐159
$50,000 $50,000 7 Park Rehabilitation and Development (COMM)
$100,000 COMM_Key
Schuylkill Reilly Township Branchdale Park -‐ Development
BRC-‐SC-‐16-‐47
$37,000 $37,000 16 Small Communities/Small Projects (COMM)
$54,000 COMM_Key
Schuylkill Reilly Township Branchdale Park -Phase 2 - Development
BRC-SC-19-48
$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)
$60,000.00 COMM_Key
Schuylkill Reilly Township Branchdale Park -Phase 2 - Development
BRC-SC-19-48
$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)
$60,000.00 COMM_Key
Schuylkill Reilly Township Branchdale Park -Phase 2 - Development
BRC-SC-19-48
$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)
$60,000.00 COMM_Key
Schuylkill Reilly Township Newtown Recreation Area
BRC-‐SC-‐6-‐158
$20,000 $20,000 6 Small Communities/Small Projects (COMM)
$24,900 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 492 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Schuylkill Rush Township Miller Estates Park BRC-‐SC-‐6-‐160
$20,000 $20,000 6 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Schuylkill Rush Township Miller Park - Development
BRC-SC-19-50
$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)
$60,000.00 COMM_Key
Schuylkill Rush Township Miller Park - Development
BRC-SC-19-50
$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)
$60,000.00 COMM_Key
Schuylkill Rush Township Miller Park - Development
BRC-SC-19-50
$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)
$60,000.00 COMM_Key
Schuylkill Rush Township Quakake Playground Renovation
BRC-‐SC-‐12-‐119
$27,500 $27,500 12 Small Communities/Small Projects (COMM)
$35,000 COMM_Key
Schuylkill Ryan Township Township Park KEY-‐SC-‐5-‐174
$20,000 $20,000 5 Small Communities/Small Projects (COMM)
$28,446 COMM_Key
Schuylkill Schuylkill County Rails-‐to-‐Trails Special Study/Greenway
KEY-‐TAG-‐2-‐137
$25,000 $25,000 2 Greenway Plans (COMM)
$50,000 COMM_Key
Schuylkill Schuylkill County Schuylkill County Comprehensive Plan
BRC-‐TAG-‐8-‐165
$116,600 $60,000 8 Comp. Rec., Park, & Open Space Plans (COMM)
$528,400 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 493 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Schuylkill Schuylkill County Sweet Arrow Lake County Park Development
BRC-‐PRD-‐12-‐196
$857,500 $363,000 12 Park Rehabilitation and Development (COMM)
$1,715,000 COMM_Key
Schuylkill Schuylkill County Sweet Arrow Lake, Site Master Plan
BRC-‐TAG-‐8-‐166
$41,000 $40,000 8 Master Site Plans (COMM)
$82,000 COMM_Key
Schuylkill Schuylkill Haven Borough
Island Park -‐Phase I BRC-‐PRD-‐13.3-‐426
$57,500 $57,500 13.3 Park Rehabilitation and Development (COMM)
$115,000 COMM_Key
Schuylkill Shenandoah Borough
Bicentennial Park BRC-‐PRD-‐6-‐165
$40,000 $56,100 6 Park Rehabilitation and Development (COMM)
$112,200 COMM_Key
Schuylkill Shenandoah Borough
Girard Park KEY-‐PRD-‐3-‐194
$20,000 $20,000 3 Park Rehabilitation and Development (COMM)
$40,000 COMM_Key
Schuylkill St. Clair Borough Middleward Playground
KEY-‐SC-‐3-‐206
$20,000 $20,000 3 Small Communities/Small Projects (COMM)
$22,000 COMM_Key
Schuylkill St. Clair Borough North Ward Park KEY-‐PRD-‐5-‐189
$75,000 $75,000 5 Park Rehabilitation and Development (COMM)
$150,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 494 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Schuylkill St. Clair Borough Third Street Park-‐ Development
BRC-‐SC-‐18-‐42
$40,000 $40,000 18 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Schuylkill Tamaqua Borough Bungalow Playground
BRC-‐PRD-‐11-‐89
$50,000 $50,000 11 Park Rehabilitation and Development (COMM)
$100,000 COMM_Key
Schuylkill Tamaqua Borough Circuit Rider -‐ Year 1 KEY-‐TAG-‐2-‐153
$25,000 $25,000 2 Circuit Rider (COMM)
$25,000 COMM_Key
Schuylkill Tamaqua Borough Circuit Rider -‐ Year 2 KEY-‐TAG-‐3-‐217
$19,500 $19,500 3 Circuit Rider (COMM)
$26,000 COMM_Key
Schuylkill Tamaqua Borough Dutch Hill Playground -‐ Development
BRC-‐PRD-‐17-‐153
$28,000 $28,000 17 Park Rehabilitation and Development (COMM)
$56,000 COMM_Key
Schuylkill Tamaqua Borough Feasibility Study KEY-‐RTP-‐3-‐22
$4,000 $4,000 3 Feasibility Studies (RT)
$8,000 RT_Key
Schuylkill Tamaqua Borough Recreation Improvements
BRC-‐PRD-‐7-‐187
$60,000 $60,000 7 Park Rehabilitation and Development (COMM)
$120,000 COMM_Key
Schuylkill Walker Township Wildcat Park Rehabilitation
BRC-‐SC-‐12-‐126
$30,000 $30,000 12 Small Communities/Small Projects (COMM)
$40,000 COMM_Key
Schuylkill Washington Township
Schaeffer Land Acquisition
BRC-‐ACQ-‐13.3-‐285
$67,400 $64,600 13.3 Acquisition (COMM)
$134,800 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 495 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Schuylkill Washington Township
Washington Township Recreation Park Master Site Plan
BRC-‐TAG-‐13.3-‐498
$10,000 $10,000 13.3 Master Site Plans (COMM)
$20,000 COMM_Key
Schuylkill West Mahanoy Township
Altamont Playground KEY-‐SC-‐5-‐225
$20,000 $20,000 5 Small Communities/Small Projects (COMM)
$25,000 COMM_Key
Schuylkill West Penn Township
West Penn Park KEY-‐ACQ-‐4-‐171
$28,900 $28,000 4 Acquisition (COMM)
$57,900 COMM_Key
Schuylkill West Penn Township
West Penn Park East BRC-‐PRD-‐14-‐182
$75,000 $75,000 14 Park Rehabilitation and Development (COMM)
$150,000 COMM_Key
Snyder Beavertown Borough
Borough Park BRC-‐SC-‐10-‐64
$29,000 $30,000 10 Small Communities/Small Projects (COMM)
$39,800 COMM_Key
Snyder Center Township Keene Community Park
BRC-‐TAG-‐12.5-‐27
$15,000 $15,000 12.5 Master Site Plans (COMM)
$30,000 COMM_Key
Snyder Center Township Keene Community Park -‐ Phase I -‐Rehabilitation
BRC-‐PRD-‐15-‐52
$100,000 $65,000 15 Park Rehabilitation and Development (COMM)
$200,000 COMM_Key
Snyder Freeburg Borough Freeburg-‐Washington Community Park
BRC-‐SC-‐9-‐82
$35,200 $35,000 9 Small Communities/Small Projects (COMM)
$50,400 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 496 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Snyder McClure Borough McClure Station Park BRC-‐SC-‐9-‐129
$35,000 $30,000 9 Small Communities/Small Projects (COMM)
$50,000 COMM_Key
Snyder McClure Borough Midd-‐West Recreation Peer Study
BRC-‐TAG-‐8-‐9
$7,500 $7,500 8 Peer-‐to-‐Peer Tech. Assistance (COMM)
$8,250 COMM_Key
Snyder Middleburg Borough Charles Park -‐ Development
BRC-‐SC-‐17-‐47
$40,000 $40,000 17 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Snyder Middleburg Municipal Authority
Middleburg Community Swimming Pool
BRC-‐PRD-‐10-‐26
$325,000 $100,000 10 Park Rehabilitation and Development (COMM)
$650,000 COMM_Key
Snyder Middlecreek Township
Middlecreek Recreation Area-‐Development
BRC-‐SC-‐18-‐36
$40,000 $40,000 18 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Snyder Monroe Township Comprehensive Recreation, Park & Open Space Plan
BRC-‐TAG-‐11-‐225
$42,150 $50,000 11 Comp. Rec., Park, & Open Space Plans (COMM)
$84,300 COMM_Key
Snyder Monroe Township Recreation Area BRC-‐PRD-‐13.3-‐399
$217,300 $217,300 13.3 Park Rehabilitation and Development (COMM)
$434,600 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 497 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Snyder Penn Township East Snyder Park-‐ Phase I
BRC-‐PRD-‐12-‐182
$225,200 $160,000 12 Park Rehabilitation and Development (COMM)
$450,300 COMM_Key
Snyder Selinsgrove Borough Community Swimming Pool
BRC-‐PRD-‐13.3-‐609
$702,400 $250,000 13.3 Park Rehabilitation and Development (COMM)
$1,404,900 COMM_Key
Snyder Selinsgrove Borough Selinsgrove Commons-‐ Development
BRC-‐PRD-‐16-‐158
$110,200 $110,200 16 Park Rehabilitation and Development (COMM)
$220,400 COMM_Key
Snyder Snyder County Snyder County Trail FS
BRC-‐RTP-‐10-‐11
$23,800 $20,000 10 Feasibility Studies (RT)
$47,600 RT_Key
Snyder Spring Township Township Park KEY-‐SC-‐2-‐147
$13,780 $13,700 2 Small Communities/Small Projects (COMM)
$13,780 COMM_Key
Snyder West Perry Township
Richfield Youth Park KEY-‐SC-‐2-‐175
$19,916 $19,900 2 Small Communities/Small Projects (COMM)
$26,566 COMM_Key
Somerset Addison Borough Toll House Park KEY-‐SC-‐4-‐6 $20,000 $20,000 4 Small Communities/Small Projects (COMM)
$59,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 498 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Somerset Benson Borough Borough Park Renovation
BRC-‐SC-‐12-‐82
$32,000 $32,000 12 Small Communities/Small Projects (COMM)
$43,100 COMM_Key
Somerset Boswell Borough Tot Park KEY-‐SC-‐1-‐14 $19,072 $19,100 1 Small Communities/Small Projects (COMM)
$19,072 COMM_Key
Somerset Cambria Somerset Authority
Que Reservoir Whitewater Release
BRC-‐PRD-‐14-‐120
$643,000 $524,000 14 Park Rehabilitation and Development (COMM)
$1,286,000 COMM_Key
Somerset Cambria Somerset Authority
Que Whitewater Release Project
BRC-‐PRD-‐10-‐111
$340,000 $150,000 10 Park Rehabilitation and Development (COMM)
$680,000 COMM_Key
Somerset Central City Borough Central City Recreation Park
KEY-‐SC-‐2-‐26 $20,000 $20,000 2 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Somerset Conemaugh Township
Greenhouse Recreation Park
BRC-‐RCD-‐7-‐7
$220,000 $236,000 7 Development (RIV)
$440,000 RIVER_Key
Somerset Conemaugh Township
Stonycreek Whitewater Park
BRC-‐PRD-‐10-‐199
$495,000 $245,000 10 Park Rehabilitation and Development (COMM)
$990,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 499 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Somerset Confluence Borough Beggs Park BRC-‐SC-‐8-‐52
$20,000 $20,000 8 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Somerset Confluence Borough Community Center Renovation
BRC-‐SC-‐12-‐88
$39,700 $40,000 12 Small Communities/Small Projects (COMM)
$59,400 COMM_Key
Somerset Hooversville Borough
Hoover Field Park Renovation
BRC-‐SC-‐12-‐100
$40,000 $40,000 12 Small Communities/Small Projects (COMM)
$63,500 COMM_Key
Somerset Indian Lake Borough Calendars Run Hiking and Biking Trail
BRC-‐PRD-‐11-‐45
$72,800 $72,800 11 Park Rehabilitation and Development (COMM)
$363,400 COMM_Key
Somerset Jenner Township Comprehensive Recreation, Park & Open Space Plan
BRC-‐TAG-‐13-‐187
$15,000 $15,000 13 Comp. Rec., Park, & Open Space Plans (COMM)
$30,000 COMM_Key
Somerset Ogle Township Ogle Community Park
BRC-‐SC-‐11-‐142
$40,000 $40,000 11 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Somerset Rockwood Borough Rockwood Community Playground
BRC-‐SC-‐7-‐166
$20,000 $20,000 7 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 500 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Somerset Salisbury Borough Borough Park KEY-‐SC-‐3-‐189
$20,000 $20,000 3 Small Communities/Small Projects (COMM)
$70,000 COMM_Key
Somerset Shade Township Township Park KEY-‐SC-‐4-‐135
$20,000 $20,000 4 Small Communities/Small Projects (COMM)
$28,000 COMM_Key
Somerset Somerset Borough Union Street Playground
KEY-‐PRD-‐3-‐197
$40,000 $40,000 3 Park Rehabilitation and Development (COMM)
$80,000 COMM_Key
Somerset Somerset County Allegheny Highlands Trail
BRC-‐RTD-‐6-‐18
$100,000 $100,000 6 Rail Rehabilitation and Development (RT)
$2,926,400 RT_Key
Somerset Somerset County Allegheny Highlands Trail
BRC-‐RTD-‐7-‐15
$140,000 $140,000 7 Rail Rehabilitation and Development (RT)
$758,750 RT_Key
Somerset Somerset County Allegheny Highlands Trail
BRC-‐RTD-‐8-‐15
$440,000 $440,000 8 Rail Rehabilitation and Development (RT)
$1,848,000 RT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 501 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Somerset Somerset County Allegheny Highlands Trail
KEY-‐PRD-‐2-‐142
$105,000 $105,000 2 Park Rehabilitation and Development (COMM)
$1,528,400 COMM_Key
Somerset Somerset County Allegheny Highlands Trail -‐ Casselman River Bridge
KEY-‐RTD-‐5-‐16
$50,000 $50,000 5 Rail Rehabilitation and Development (RT)
$100,000 RT_Key
Somerset Somerset County Allegheny Highlands Trail Project
KEY-‐RTD-‐3-‐21
$52,000 $52,000 3 Rail Rehabilitation and Development (RT)
$305,000 RT_Key
Somerset Somerset County Allegheny Trail Alliance Circuit Rider -‐ Year 1
KEY-‐TAG-‐5-‐186
$25,000 $25,000 5 Circuit Rider (COMM)
$88,963 COMM_Key
Somerset Somerset County Great Allegheny Passage-‐Garrett Underpass
BRC-‐PRD-‐13-‐431
$100,000 $400,000 13 Park Rehabilitation and Development (COMM)
$870,000 COMM_Key
Somerset Somerset County Somerset Lake Park Feasibility Study/Site Plan
BRC-‐TAG-‐10-‐169
$30,000 $30,000 10 Feasibility Studies (COMM)
$60,000 COMM_Key
Somerset Somerset County Conservancy
Florence Property Acquisition -‐ (Kimberly Run Natural Area)
BRC-‐LTA-‐18-‐17
$129,933 $118,700 18 Open Space Acquisition (LT)
$259,866 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 502 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Somerset Southern Alleghenies Conservancy
Laurel Hill Creek BRC-‐RCP-‐7-‐18
$110,000 $75,000 7 Planning (RIV) $232,500 RIVER_Key
Somerset Stonycreek Township
Shanksville-‐Stonycreek Recreation Park
BRC-‐SC-‐12-‐125
$40,000 $40,000 12 Small Communities/Small Projects (COMM)
$56,700 COMM_Key
Somerset Stonycreek Township
Shanksville-‐Stonycreek Recreational Park
KEY-‐SC-‐5-‐192
$20,000 $20,000 5 Small Communities/Small Projects (COMM)
$24,890 COMM_Key
Somerset Stoystown Borough Quemahoning Stoystown Community Park
BRC-‐SC-‐11-‐159
$30,000 $30,000 11 Small Communities/Small Projects (COMM)
$40,000 COMM_Key
Somerset Western Pennsylvania Conservancy
Countryman Tract Acquisition
BRC-‐LTA-‐16-‐39
$250,000 $250,000 16 Open Space Acquisition (LT)
$680,000 LT_Key
Somerset Western Pennsylvania Conservancy
Weld Property Acquisition
BRC-LTA-19-31
$110,765.00 $110,000.00 19 Open Space Acquisition (LT)
$221,530.00 LT_Key
Somerset Western Pennsylvania Conservancy
Weld Property Acquisition
BRC-LTA-19-31
$110,765.00 $110,000.00 19 Open Space Acquisition (LT)
$221,530.00 LT_Key
Somerset Western Pennsylvania Conservancy
Weld Property Acquisition
BRC-LTA-19-31
$110,765.00 $110,000.00 19 Open Space Acquisition (LT)
$221,530.00 LT_Key
Somerset Windber Borough Three Sites BRC-‐SC-‐11-‐166
$40,000 $40,000 11 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 503 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Somerset Windber Borough Winber Borough Park
BRC-‐SC-‐7-‐212
$40,000 $40,000 7 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Somerset Windber Borough Windber Recreation Park Site Plan/Acquisition
BRC-‐TAG-‐12.5-‐24
$25,000 $25,000 12.5 Master Site Plans (COMM)
$50,000 COMM_Key
Statewide Pennsylvania Land Trust Association
Conservation Easement Assistance Program 2014
BRC-SR-19-182
$120,000.00 $75,000.00 19 Partnerships Projects
$240,000.00 LT_Key
Statewide Pennsylvania Land Trust Association
Education and Technical Assistance 2014
BRC-SR-19-183
$451,161.00 $80,000.00 19 Partnerships Projects
$874,734.00 LT_Key
Statewide Pennsylvania Organization for Watersheds and Rivers, Inc.
PA River Sojourn Grants
BRC-‐RCI-‐9-‐15
$324,000 $386,000 9 Implementation (RIV)
$772,000 RIVER_Key
Statewide Pennsylvania Trout, Inc.
Coldwater Heritage Partnership Program
BRC-‐RCP-‐8-‐14
$204,000 $179,000 8 Coldwater Heritage Partnership
$416,750 RIVER_Key
Statewide Western Pennsylvania Conservancy
Building Partnerships for Vernal Pool Conservation 2014
BRC-SR-19-195
$73,000.00 $73,000.00 19 Partnerships Projects
$146,000.00 LT_Key
Sullivan Endless Mountains Resource Conservation Trust
Muncy Creek KEY-‐CHP-‐2-‐3
$5,000 $5,000 5 Coldwater Heritage Partnership
$5,000 RIVER_Key
Sullivan Forksville Borough Borough Park KEY-‐SC-‐3-‐67 $20,000 $20,000 3 Small Communities/Small Projects (COMM)
$35,775 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 504 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Sullivan Forksville Borough Playground/Recreation Area
KEY-‐ACQ-‐1-‐50
$12,500 $8,000 1 Acquisition (COMM)
$25,000 COMM_Key
Sullivan Laporte Borough Laporte Park KEY-‐SC-‐1-‐71 $20,000 $20,000 1 Small Communities/Small Projects (COMM)
$28,920 COMM_Key
Sullivan Northcentral Pennsylvania Conservancy
Conklin Run Tract Acquisition
BRC-‐LTA-‐8-‐12
$375,000 $375,000 8 Open Space Acquisition (LT)
$750,000 LT_Key
Sullivan, Susquehanna, Tioga, Wyoming
Wyoming County Multi-‐County Open Space & Greenway Plan
BRC-‐TAG-‐13-‐212
$100,000 $100,000 13 Greenway Plans (COMM)
$200,000 COMM_Key
Susquehanna Brooklyn Township Community Park KEY-‐SC-‐4-‐19 $20,000 $20,000 4 Small Communities/Small Projects (COMM)
$25,049 COMM_Key
Susquehanna Clifford Township Clifford Recreational Complex
BRC-‐SC-‐10-‐71
$40,000 $40,000 10 Small Communities/Small Projects (COMM)
$109,760 COMM_Key
Susquehanna Edward L. Rose Conservancy, Inc.
Feldstein Property BRC-‐LTA-‐6-‐9
$110,000 $100,000 6 Open Space Acquisition (LT)
$220,000 LT_Key
Susquehanna Forest City Borough Babe Ruth Field KEY-‐SC-‐1-‐49 $19,090 $19,000 1 Small Communities/Small Projects (COMM)
$19,340 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 505 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Susquehanna Forest City Borough Kennedy Park BRC-‐SC-‐13.3-‐301
$20,000 $24,000 13.3 Small Communities/Small Projects (COMM)
$28,800 COMM_Key
Susquehanna Forest City Borough Kennedy Park BRC-‐SC-‐6-‐66
$20,000 $20,000 6 Small Communities/Small Projects (COMM)
$25,000 COMM_Key
Susquehanna Forest City Borough Kennedy Park Baseball Field
BRC-‐SC-‐7-‐75
$20,000 $20,000 7 Small Communities/Small Projects (COMM)
$25,405 COMM_Key
Susquehanna Forest Lake Township
Charles E. Small Park Renovation
BRC-‐SC-‐12-‐95
$29,400 $29,400 12 Small Communities/Small Projects (COMM)
$38,800 COMM_Key
Susquehanna Friends of Salt Springs Park, Inc.
Fogler Property Acquisition
BRC-‐LTA-‐11-‐11
$90,000 $90,000 11 Open Space Acquisition (LT)
$180,000 LT_Key
Susquehanna Friends of Salt Springs Park, Inc.
Forrest Property Acquisition
BRC-‐ACQ-‐8-‐74
$26,000 $9,500 8 Acquisition (COMM)
$52,000 COMM_Key
Susquehanna Herrick Township Community Park BRC-‐SC-‐9-‐92
$29,000 $29,000 9 Small Communities/Small Projects (COMM)
$38,000 COMM_Key
Susquehanna Hop Bottom Borough
Mary Karhnak Memorial Park
KEY-‐SC-‐2-‐62 $14,012 $14,000 2 Small Communities/Small Projects (COMM)
$17,492 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 506 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Susquehanna Montrose Borough Memorial Park BRC-‐SC-‐6-‐119
$20,000 $20,000 6 Small Communities/Small Projects (COMM)
$28,000 COMM_Key
Susquehanna New Milford Borough
Blue Ridge Park BRC-‐SC-‐6-‐124
$20,000 $20,000 6 Small Communities/Small Projects (COMM)
$24,400 COMM_Key
Susquehanna New Milford Borough
Blue Ridge Park-‐Rehabilitation
BRC-‐PRD-‐15-‐63
$160,000 $80,000 15 Park Rehabilitation and Development (COMM)
$538,345 COMM_Key
Susquehanna Oakland Borough Oakland Borough Park Rehabilitation
BRC-‐SC-‐12-‐111
$32,000 $32,000 12 Small Communities/Small Projects (COMM)
$44,000 COMM_Key
Susquehanna Rail-‐Trail Council of Northeastern Pennsylvania, Inc.
D & H Rail Trail BRC-‐RTD-‐7-‐13
$24,300 $152,800 7 Rail Rehabilitation and Development (RT)
$305,600 RT_Key
Susquehanna Rail-‐Trail Council of Northeastern Pennsylvania, Inc.
Endless Mountains Rail-‐Trail Feasibility Study
BRC-‐RTP-‐14-‐282
$25,000 $25,000 14 Feasibility Studies (RT)
$50,000 RT_Key
Susquehanna Rail-‐Trail Council of Northeastern Pennsylvania, Inc.
Forest City Trailhead Plan
KEY-‐RTP-‐4-‐17
$4,000 $4,000 4 Master Plans (RT)
$8,000 RT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 507 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Susquehanna Susquehanna County
Peer-‐to-‐Peer KEY-‐TAG-‐3-‐212
$7,500 $7,500 3 Peer-‐to-‐Peer Tech. Assistance (COMM)
$8,250 COMM_Key
Susquehanna Susquehanna County
Wheaton House -‐ Phase I
KEY-‐PRD-‐3-‐211
$20,000 $20,000 3 Park Rehabilitation and Development (COMM)
$40,000 COMM_Key
Susquehanna Susquehanna Depot Borough
Frank J. Reddon Sports Complex
KEY-‐SC-‐3-‐213
$10,500 $10,500 3 Small Communities/Small Projects (COMM)
$11,500 COMM_Key
Susquehanna Susquehanna Depot Borough
Prospect Street Park KEY-‐SC-‐1-‐133
$18,850 $18,800 1 Small Communities/Small Projects (COMM)
$20,050 COMM_Key
Susquehanna Trails Conservation Corporation
Rail Trail of Northeastern Pa.
KEY-‐RTA-‐95-‐27
$20,300 $20,300 1 Acquisition (RT) $40,600 RT_Key
Susquehanna Trails Conservation Corporation
River Cons. Plan-‐Upper Lackawanna Rvr. W
KEY-‐RCP-‐96-‐13
$40,000 $40,000 3 Planning (RIV) $80,000 RIVER_Key
Tioga Blossburg Borough Island Park BRC-‐SC-‐14-‐75
$40,000 $40,000 14 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Tioga Blossburg Borough Island Park Pool KEY-‐PRD-‐1-‐12
$26,000 $26,000 1 Park Rehabilitation and Development (COMM)
$52,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 508 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Tioga Elkland Borough Feasibility Study KEY-‐TAG-‐1-‐46
$2,500 $2,500 1 Feasibility Studies (COMM)
$5,000 COMM_Key
Tioga Elkland Borough Jerome Park KEY-‐SC-‐3-‐59 $20,000 $20,000 3 Small Communities/Small Projects (COMM)
$27,000 COMM_Key
Tioga Hamilton Township Township Park (aka-‐ Hope Park)-‐ Development
BRC-‐SC-‐16-‐42
$40,000 $40,000 16 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Tioga Jackson Township Howser Park KEY-‐SC-‐2-‐67 $20,000 $20,000 2 Small Communities/Small Projects (COMM)
$26,000 COMM_Key
Tioga Lawrenceville Borough
Cherry Street Park-‐ Development
BRC-‐SC-‐16-‐45
$40,000 $40,000 16 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Tioga Liberty Township Peer-‐to-‐Peer KEY-‐TAG-‐6-‐1
$7,500 $7,500 6 Peer-‐to-‐Peer Tech. Assistance (COMM)
$8,250 COMM_Key
Tioga Mansfield Borough Mansfield Recreation Center
BRC-‐PRD-‐14-‐153
$108,727 $108,700 14 Park Rehabilitation and Development (COMM)
$217,455 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 509 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Tioga Mansfield Borough Memorial Swimming Pool
KEY-‐PRD-‐5-‐122
$300,000 $150,000 5 Park Rehabilitation and Development (COMM)
$1,145,450 COMM_Key
Tioga Mansfield Borough Swimming Pool Feasibility Study
KEY-‐TAG-‐2-‐93
$5,750 $5,700 2 Feasibility Studies (COMM)
$11,500 COMM_Key
Tioga Northern Tier Recreation Authority
Baker Memorial Park BRC-‐PRD-‐11-‐62
$59,600 $50,000 11 Park Rehabilitation and Development (COMM)
$119,100 COMM_Key
Tioga Northern Tier Recreation Authority
Gertrude Case Community Playground
KEY-‐SC-‐4-‐117
$20,000 $20,000 4 Small Communities/Small Projects (COMM)
$25,000 COMM_Key
Tioga Sullivan Township Annette Smith Memorial Park
BRC-‐SC-‐14-‐106
$31,600 $31,600 14 Small Communities/Small Projects (COMM)
$43,100 COMM_Key
Tioga Tioga Borough Lower Tioga Valley Regional Pool
BRC-‐PRD-‐11-‐90
$205,000 $205,000 11 Park Rehabilitation and Development (COMM)
$410,000 COMM_Key
Tioga Tioga Borough Tioga Community Pool Feasibility Study
BRC-‐TAG-‐7-‐189
$7,050 $7,000 7 Feasibility Studies (COMM)
$14,100 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 510 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Tioga Wellsboro Borough Hamilton Lake Boat Launch
BRC-‐PRD-‐13-‐154
$106,600 $106,000 13 Park Rehabilitation and Development (COMM)
$220,000 COMM_Key
Tioga Wellsboro Borough Woodland Park Master Plan
BRC-TAG-19-148
$24,435.00 $24,400.00 19 Master Site Plans (COMM)
$48,870.00 COMM_Key
Tioga Wellsboro Borough Woodland Park Master Plan
BRC-TAG-19-148
$24,435.00 $24,400.00 19 Master Site Plans (COMM)
$48,870.00 COMM_Key
Tioga Wellsboro Borough Woodland Park Master Plan
BRC-TAG-19-148
$24,435.00 $24,400.00 19 Master Site Plans (COMM)
$48,870.00 COMM_Key
Union Buffalo Valley Recreation Authority
Buffalo Valley Rail Trail – Lewisburg Extension – Development
BRC-PRD-19-91
$488,000.00 $488,000.00 19 Park Rehabilitation and Development (COMM)
$1,000,000.00 COMM_Key
Union Buffalo Valley Recreation Authority
Buffalo Valley Rail Trail – Lewisburg Extension – Development
BRC-PRD-19-91
$488,000.00 $488,000.00 19 Park Rehabilitation and Development (COMM)
$1,000,000.00 COMM_Key
Union Buffalo Valley Recreation Authority
Buffalo Valley Rail Trail – Lewisburg Extension – Development
BRC-PRD-19-91
$488,000.00 $488,000.00 19 Park Rehabilitation and Development (COMM)
$1,000,000.00 COMM_Key
Union East Buffalo Township
Lewisburg Area Recreation Circuit Rider-‐ Year 1
KEY-‐TAG-‐5-‐52
$35,000 $94,100 5 Circuit Rider (COMM)
$35,000 COMM_Key
Union Hartleton Borough Community Park BRC-‐SC-‐13-‐303
$20,000 $20,000 13 Small Communities/Small Projects (COMM)
$25,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 511 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Union Hartleton Borough Hartleton Park BRC-‐SC-‐6-‐79
$20,000 $20,000 6 Small Communities/Small Projects (COMM)
$24,000 COMM_Key
Union Hartley Township Laurel Run Activity Park
BRC-‐TAG-‐7-‐83
$15,000 $15,000 7 Feasibility Studies (COMM)
$30,000 COMM_Key
Union Hartley Township Laurelton Recreation Park
KEY-‐SC-‐5-‐83 $20,000 $20,000 5 Small Communities/Small Projects (COMM)
$30,154 COMM_Key
Union Lewis Township Ball Field Rehab BRC-‐SC-‐11-‐134
$40,000 $40,000 11 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Union Lewisburg Area Recreation Authority
Community Pool Bathhouse
KEY-‐PRD-‐1-‐72
$30,000 $30,000 1 Park Rehabilitation and Development (COMM)
$62,000 COMM_Key
Union Lewisburg Area Recreation Authority
Comp. Rec, Park and Open Space Plan
BRC-‐TAG-‐8-‐104
$20,000 $20,000 8 Comp. Rec., Park, & Open Space Plans (COMM)
$40,000 COMM_Key
Union Lewisburg Area Recreation Authority
LARA Peer to Peer BRC-‐TAG-‐18-‐1
$10,000 $10,000 18 Peer-‐to-‐Peer Tech. Assistance (COMM)
$11,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 512 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Union Lewisburg Area Recreation Authority
Lewisburg Area Recreation Park
BRC-‐PRD-‐11-‐50
$500,000 $500,000 11 Park Rehabilitation and Development (COMM)
$2,313,500 COMM_Key
Union Lewisburg Area Recreation Authority
Lewisburg Area Recreation Park -‐ West End
BRC-‐PRD-‐13-‐116
$300,000 $300,000 13 Park Rehabilitation and Development (COMM)
$650,000 COMM_Key
Union New Berlin Borough Gateway to the Commons Acquisition (Wagner Parcel)
BRC-‐ACQ-‐14-‐64
$15,900 $10,000 14 Acquisition (COMM)
$31,800 COMM_Key
Union New Berlin Borough Multi-‐Purpose Park BRC-‐PRD-‐6-‐122
$41,750 $41,700 6 Park Rehabilitation and Development (COMM)
$83,500 COMM_Key
Union New Berlin Borough Multi-‐Purpose Park KEY-‐ACQ-‐3-‐150
$29,200 $29,200 3 Acquisition (COMM)
$58,500 COMM_Key
Union SEDA-‐Council of Governments
Community River Sports Park Feasibility Study
BRC-‐TAG-‐13.3-‐491
$20,000 $20,000 13.3 Feasibility Studies (COMM)
$50,000 COMM_Key
Union Union County Buffalo Valley Trail BRC-‐RTP-‐8-‐17
$26,900 $26,000 8 Feasibility Studies (RT)
$53,700 RT_Key
Union Union County Greenway and Open Space Plan
BRC-TAG-19-145
$26,000.00 $26,000.00 19 Comp. Rec., Park, & Open Space Plans (COMM)
$52,000.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 513 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Union Union County Greenway and Open Space Plan
BRC-TAG-19-145
$26,000.00 $26,000.00 19 Comp. Rec., Park, & Open Space Plans (COMM)
$52,000.00 COMM_Key
Union Union County Greenway and Open Space Plan
BRC-TAG-19-145
$26,000.00 $26,000.00 19 Comp. Rec., Park, & Open Space Plans (COMM)
$52,000.00 COMM_Key
Union Union County Peer-‐to-‐Peer KEY-‐TAG-‐3-‐222
$6,750 $6,750 3 Peer-‐to-‐Peer Tech. Assistance (COMM)
$7,500 COMM_Key
Venango Allegheny Valley Trails Association
Allegheny River Trail BRC-‐RTA-‐6-‐25
$90,000 $90,000 6 Acquisition (RT) $400,000 RT_Key
Venango Allegheny Valley Trails Association
Allegheny River Trail -‐ Rockland to Emlenton; Refinery Spur & Boat Launch; Foxburg to Parker
BRC-‐RTD-‐10-‐4
$100,000 $100,000 10 Rail Rehabilitation and Development (RT)
$900,000 RT_Key
Venango Allegheny Valley Trails Association
Deep Valley Tunnel Engineering
BRC-‐RTD-‐6-‐2
$100,000 $250,000 6 Rail Rehabilitation and Development (RT)
$601,500 RT_Key
Venango Allegheny Valley Trails Association
Sandy Creek Trail BRC-‐RTD-‐11-‐1
$200,000 $314,000 11 Rail Rehabilitation and Development (RT)
$400,000 RT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 514 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Venango Barkeyville Borough Community Park BRC-‐SC-‐9-‐14
$10,900 $20,000 9 Small Communities/Small Projects (COMM)
$24,300 COMM_Key
Venango Barkeyville Borough Community Park KEY-‐ACQ-‐1-‐8
$7,850 $7,900 1 Acquisition (COMM)
$22,500 COMM_Key
Venango Barkeyville Borough Community Park KEY-‐SC-‐5-‐13 $20,000 $20,000 5 Small Communities/Small Projects (COMM)
$22,000 COMM_Key
Venango Cherrytree Township Township Park -‐ Pavilion #1
BRC-‐SC-‐10-‐69
$20,000 $20,000 10 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Venango Clintonville Borough Clintonville Playground
BRC-‐SC-‐10-‐197
$20,000 $20,000 10 Small Communities/Small Projects (COMM)
$25,800 COMM_Key
Venango Conneaut Lake-‐French Creek Valley Conservancy
Sugarcreek Station Riparian Area
BRC-‐LTA-‐6-‐25
$90,000 $60,000 6 Open Space Acquisition (LT)
$279,600 LT_Key
Venango Conneaut Lake-‐French Creek Valley Conservancy
Vaszil Property Acquisition
BRC-‐RCA-‐11-‐7
$162,000 $151,000 11 Acquisition (RIV)
$347,000 RIVER_Key
Venango Cranberry Township Lower Two Mile Run Campsite
KEY-‐PRD-‐1-‐35
$25,530 $25,500 1 Park Rehabilitation and Development (COMM)
$55,050 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 515 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Venango Cranberry Township Visitor Center KEY-‐RTD-‐95-‐9
$22,500 $22,500 1 Rail Rehabilitation and Development (RT)
$46,000 RT_Key
Venango Emlenton Borough Veteran's Memorial and Borough Parks
BRC-‐SC-‐7-‐67
$40,000 $40,000 7 Small Communities/Small Projects (COMM)
$69,837 COMM_Key
Venango Franklin City Miller-‐Sibley Pool -‐ Development
BRC-‐PRD-‐17-‐121
$40,000 $40,000 17 Park Rehabilitation and Development (COMM)
$80,000 COMM_Key
Venango Franklin City Miller-‐Sibley Recreational Complex
KEY-‐PRD-‐4-‐61
$43,100 $43,100 4 Park Rehabilitation and Development (COMM)
$88,100 COMM_Key
Venango Franklin City Riverfront Park Bike Trail Rehabilitation Project
BRC-‐PRD-‐17-‐120
$11,315 $11,300 17 Park Rehabilitation and Development (COMM)
$20,835 COMM_Key
Venango Oil City Community Gateway Project
KEY-‐PRD-‐4-‐118
$7,900 $7,900 4 Park Rehabilitation and Development (COMM)
$15,800 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 516 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Venango Oil City Comp. Plan and Swimming Pool Feasibility Study
KEY-‐TAG-‐4-‐119
$15,000 $15,000 4 Comp. Rec., Park, & Open Space Plans (COMM)
$30,000 COMM_Key
Venango Oil City Comprehensive Waterways Plan
BRC-‐RCI-‐13.6-‐560
$37,500 $37,500 13.6 Implementation (RIV)
$75,000 RIVER_Key
Venango Oil City Hasson Park KEY-‐PRD-‐3-‐160
$70,000 $100,000 3 Park Rehabilitation and Development (COMM)
$140,000 COMM_Key
Venango Oil City Oil City Marina Master Site Plan
BRC-TAG-19-140
$13,073.00 $13,000.00 19 Master Site Plans (COMM)
$26,146.00 COMM_Key
Venango Oil City Oil City Marina Master Site Plan
BRC-TAG-19-140
$13,073.00 $13,000.00 19 Master Site Plans (COMM)
$26,146.00 COMM_Key
Venango Oil City Oil City Marina Master Site Plan
BRC-TAG-19-140
$13,073.00 $13,000.00 19 Master Site Plans (COMM)
$26,146.00 COMM_Key
Venango Oil City Pedestrian Walkway Replacement
BRC-‐PRD-‐17-‐144
$60,000 $60,000 17 Park Rehabilitation and Development (COMM)
$120,700 COMM_Key
Venango Oil Region Alliance of Business, Industry & Tourism
Oil Creek Memorial Landing -‐ Construction
BRC-‐RCD-‐17-‐169
$97,000 $83,000 17 Development (RIV)
$194,000 RIVER_Key
Venango Plum Township Cooper Park BRC-‐SC-‐11-‐148
$20,000 $28,300 11 Small Communities/Small Projects (COMM)
$38,300 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 517 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Venango Plum Township Cooper Park KEY-‐SC-‐1-‐111
$14,785 $14,800 1 Small Communities/Small Projects (COMM)
$14,785 COMM_Key
Venango Sandycreek Township
Robert Mason Brown Park & West View Playground
BRC-‐SC-‐12-‐121
$40,000 $40,000 12 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Venango Venango County Recreation, Parks and Open Space in Venango County
BRC-‐TAG-‐12.5-‐23
$55,000 $55,000 12.5 Comp. Rec., Park, & Open Space Plans (COMM)
$110,000 COMM_Key
Venango Venango County Two Mile Run Park KEY-‐PRD-‐4-‐160
$60,000 $30,000 4 Park Rehabilitation and Development (COMM)
$120,000 COMM_Key
Venango Venango County Two Mile Run Park Master Plan
KEY-‐TAG-‐4-‐159
$45,000 $40,000 4 Master Site Plans (COMM)
$90,000 COMM_Key
Venango Venango County Two Mile Run Park-‐ Development
BRC-‐PRD-‐16-‐165
$79,945 $100,000 16 Park Rehabilitation and Development (COMM)
$184,345 COMM_Key
Venango Western Pennsylvania Conservancy
Cornuet Acquisition (Eastern Massasauga Habitat)
BRC-‐LTA-‐18-‐19
$40,950 $40,900 18 Open Space Acquisition (LT)
$81,901 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 518 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Venango Western Pennsylvania Conservancy
Firth Property Easement
BRC-‐LTA-‐15-‐124
$159,225 $159,000 15 Critical Habitat Acquisition (LT)
$318,450 LT_Key
Warren Clarendon Borough Allegheny Valley Playground
KEY-‐SC-‐4-‐29 $20,000 $20,000 4 Small Communities/Small Projects (COMM)
$22,000 COMM_Key
Warren Columbus Township Mather Park BRC-‐SC-‐7-‐43
$21,250 $21,000 7 Small Communities/Small Projects (COMM)
$22,500 COMM_Key
Warren Elk Township Playground Upgrade BRC-‐SC-‐11-‐119
$29,900 $30,000 11 Small Communities/Small Projects (COMM)
$39,800 COMM_Key
Warren Elk Township Township Park BRC-‐SC-‐14-‐82
$20,000 $20,000 14 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Warren Pine Grove Township
Werner Park BRC-‐SC-‐6-‐148
$20,000 $20,000 6 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Warren Sheffield Township Sheffield Memorial Park
BRC-‐SC-‐7-‐173
$20,000 $33,000 7 Small Communities/Small Projects (COMM)
$55,281 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 519 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Warren Sheffield Township Sports Complex BRC-‐PRD-‐12-‐291
$106,000 $100,000 12 Park Rehabilitation and Development (COMM)
$212,000 COMM_Key
Warren Sheffield Township Township Park KEY-‐SC-‐2-‐138
$16,800 $16,800 2 Small Communities/Small Projects (COMM)
$21,300 COMM_Key
Warren Warren City Beaty Park BRC-‐PRD-‐13-‐153
$80,000 $80,000 13 Park Rehabilitation and Development (COMM)
$160,000 COMM_Key
Warren Warren City Beaty Park BRC-‐PRD-‐13.3-‐441
$87,500 $87,500 13.3 Park Rehabilitation and Development (COMM)
$175,000 COMM_Key
Warren Warren City Beaty Park-‐Phase 3 -‐ Development
BRC-‐PRD-‐17-‐159
$76,913 $100,000 17 Park Rehabilitation and Development (COMM)
$153,826 COMM_Key
Warren Warren City DeFrees Park KEY-‐PRD-‐5-‐211
$45,000 $45,000 5 Park Rehabilitation and Development (COMM)
$90,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 520 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Warren Warren City Municipal Swimming Pool - Development
BRC-PRD-19-123
$98,545.00 $98,500.00 19 Park Rehabilitation and Development (COMM)
$197,090.00 COMM_Key
Warren Warren City Municipal Swimming Pool - Development
BRC-PRD-19-123
$98,545.00 $98,500.00 19 Park Rehabilitation and Development (COMM)
$197,090.00 COMM_Key
Warren Warren City Municipal Swimming Pool - Development
BRC-PRD-19-123
$98,545.00 $98,500.00 19 Park Rehabilitation and Development (COMM)
$197,090.00 COMM_Key
Warren Warren City Point Park Pool Feasibility Study
KEY-‐TAG-‐4-‐164
$10,000 $10,000 4 Feasibility Studies (COMM)
$20,000 COMM_Key
Warren Warren City Point Park, C.A.R. Pool
BRC-‐PRD-‐6-‐188
$275,000 $275,000 6 Park Rehabilitation and Development (COMM)
$550,000 COMM_Key
Warren Warren County Warren Bike/Hike Trail
KEY-‐RTP-‐5-‐19
$24,250 $24,200 5 Feasibility Studies (RT)
$129,250 RT_Key
Warren Warren County Warren/North Warren Bike/Hike Trail Extension
BRC-‐PRD-‐12-‐214
$172,200 $172,000 12 Park Rehabilitation and Development (COMM)
$618,700 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 521 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Washington Bentleyville Borough Richardson Park BRC-‐SC-‐8-‐23
$20,000 $20,000 8 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Washington Bentleyville Borough Richardson Park KEY-‐SC-‐3-‐17 $6,500 $6,500 3 Small Communities/Small Projects (COMM)
$9,000 COMM_Key
Washington Bentleyville Borough Richardson Park -‐ Phase II
BRC-‐SC-‐10-‐65
$20,000 $20,000 10 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Washington Burgettstown Borough
Raccoon Valley Park BRC-‐SC-‐9-‐37
$48,700 $40,000 9 Small Communities/Small Projects (COMM)
$77,544 COMM_Key
Washington California Borough Union Street Wharf Development
BRC-RCD-19-155
$75,000.00 $75,000.00 19 Development (RIV)
$153,736.00 COMM_Key
Washington California Borough Union Street Wharf Development
BRC-RCD-19-155
$75,000.00 $75,000.00 19 Development (RIV)
$153,736.00 COMM_Key
Washington California Borough Union Street Wharf Development
BRC-RCD-19-155
$75,000.00 $75,000.00 19 Development (RIV)
$153,736.00 COMM_Key
Washington Canonsburg Borough Town Park KEY-‐PRD-‐1-‐29
$20,749 $20,700 1 Park Rehabilitation and Development (COMM)
$41,499 COMM_Key
Washington Canonsburg Borough Town Park Master Plan
BRC-‐TAG-‐12-‐227
$27,000 $27,000 12 Master Site Plans (COMM)
$54,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 522 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Washington Canonsburg Borough Town Park Pool BRC-‐PRD-‐14-‐121
$300,000 $300,000 14 Park Rehabilitation and Development (COMM)
$625,400 COMM_Key
Washington Canton Township Canton Park/York Property Acquisition
BRC-‐ACQ-‐7-‐34
$45,050 $45,000 7 Acquisition (COMM)
$90,100 COMM_Key
Washington Canton Township Upper Chartiers Creek Greenway & Trail Plan
BRC-‐RCI-‐9-‐4 $14,600 $14,600 9 Implementation (RIV)
$29,200 RIVER_Key
Washington Cecil Township Dick Corporation Acquisition
BRC-‐ACQ-‐15-‐42
$210,200 $210,000 15 Acquisition (COMM)
$420,400 COMM_Key
Washington Centerville Borough Centerville Park BRC-‐SC-‐6-‐32
$20,000 $20,000 6 Small Communities/Small Projects (COMM)
$32,979 COMM_Key
Washington Centerville Borough Mexico/Vestaburg Park
BRC-‐SC-‐8-‐36
$20,000 $20,000 8 Small Communities/Small Projects (COMM)
$26,100 COMM_Key
Washington Charleroi Borough Four Sites KEY-‐PRD-‐5-‐33
$33,400 $33,000 5 Park Rehabilitation and Development (COMM)
$96,000 COMM_Key
Washington Chartiers Township Community Park BRC-‐PRD-‐6-‐36
$150,000 $125,000 6 Park Rehabilitation and Development (COMM)
$300,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 523 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Washington Claysville Borough McGuffey Park BRC-‐SC-‐6-‐41
$19,100 $20,000 6 Small Communities/Small Projects (COMM)
$19,100 COMM_Key
Washington Coal Center Borough Riverfront Park Improvements
BRC-‐SC-‐12-‐87
$40,000 $40,000 12 Small Communities/Small Projects (COMM)
$65,000 COMM_Key
Washington Cross Creek Township
Cedar Grove Park -‐ Phase 2-‐ Development
BRC-‐PRD-‐18-‐61
$180,200 $91,200 18 Park Rehabilitation and Development (COMM)
$360,400 COMM_Key
Washington Donora Borough Donora Garden Project
KEY-‐PRD-‐5-‐48
$9,837 $10,000 5 Park Rehabilitation and Development (COMM)
$19,674 COMM_Key
Washington Dunlevy Borough Borough Park KEY-‐SC-‐5-‐51 $15,074 $15,000 5 Small Communities/Small Projects (COMM)
$15,074 COMM_Key
Washington East Bethlehem Township
Community Square - Phase 2 - Development
BRC-SC-19-38
$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)
$59,625.00 COMM_Key
Washington East Bethlehem Township
Community Square - Phase 2 - Development
BRC-SC-19-38
$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)
$59,625.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 524 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Washington East Bethlehem Township
Community Square - Phase 2 - Development
BRC-SC-19-38
$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)
$59,625.00 COMM_Key
Washington East Finley Township Township Park KEY-‐SC-‐5-‐55 $20,000 $20,000 5 Small Communities/Small Projects (COMM)
$21,600 COMM_Key
Washington Elco Borough Children's Playground
BRC-‐SC-‐11-‐118
$21,400 $21,400 11 Small Communities/Small Projects (COMM)
$22,800 COMM_Key
Washington Houston Borough Houston Borough Recreational Facility
BRC-‐SC-‐7-‐87
$24,414 $24,000 7 Small Communities/Small Projects (COMM)
$33,608 COMM_Key
Washington McDonald Area Redevelopment Association
McDonald Trail Station & Meeting House (Phase II)
BRC-‐RTD-‐10-‐8
$37,105 $37,000 10 Rail Rehabilitation and Development (RT)
$80,805 RT_Key
Washington McDonald Borough Heritage Park KEY-‐SC-‐5-‐126
$14,834 $14,800 5 Small Communities/Small Projects (COMM)
$17,334 COMM_Key
Washington McDonald Borough Heritage Park-‐Tennis/Basketball Courts
BRC-‐SC-‐11-‐136
$40,000 $40,000 11 Small Communities/Small Projects (COMM)
$62,600 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 525 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Washington Midway Borough Midway Ballfields KEY-‐SC-‐3-‐137
$5,500 $5,500 3 Small Communities/Small Projects (COMM)
$6,000 COMM_Key
Washington Monongahela City Monongahela Aquatorium -‐ Development
BRC-‐PRD-‐16-‐148
$127,000 $127,000 16 Park Rehabilitation and Development (COMM)
$254,000 COMM_Key
Washington Montour Trail Council
Montour Trail KEY-‐RTA-‐95-‐19
$3,700 $3,700 1 Acquisition (RT) $7,400 RT_Key
Washington Montour Trail Council
Montour Trail -‐ Phase 19
BRC-‐RTD-‐13.3-‐401
$173,500 $173,400 13.3 Park Rehabilitation and Development (COMM)
$1,192,500 RT_Key
Washington Montour Trail Council
Montour Trail -‐ Phases 5, 7, and 8
KEY-‐RTD-‐3-‐13
$89,000 $89,000 3 Rail Rehabilitation and Development (RT)
$193,000 RT_Key
Washington Montour Trail Council
Montour Trail -‐ West Peters Section
BRC-‐RTD-‐12-‐11
$134,700 $124,700 12 Rail Rehabilitation and Development (RT)
$269,400 RT_Key
Washington Montour Trail Council
Montour Trail, Phase 11
BRC-‐RTD-‐9-‐8
$73,400 $70,000 9 Rail Rehabilitation and Development (RT)
$150,200 RT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 526 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Washington Morris Township Morris Township Community Park
BRC-‐SC-‐8-‐123
$28,000 $28,000 8 Small Communities/Small Projects (COMM)
$36,000 COMM_Key
Washington North Franklin Township Business & Recreation Improvement Authority
North Franklin Regional Park -‐ Phase I
BRC-‐PRD-‐13.3-‐405
$221,700 $220,000 13.3 Park Rehabilitation and Development (COMM)
$443,500 COMM_Key
Washington North Franklin Township Business & Recreation Improvement Authority
Township Recreation Facility
KEY-‐ACQ-‐4-‐116
$300,000 $75,000 4 Acquisition (COMM)
$600,000 COMM_Key
Washington North Franklin Township Business & Recreation Improvement Authority
Washington Square Parcels E1 and E2
BRC-‐ACQ-‐11-‐183
$42,100 $38,000 11 Acquisition (COMM)
$84,200 COMM_Key
Washington North Strabane Township
Comprehensive Recreation, Park and Open Space Plan
BRC-‐TAG-‐11.5-‐28
$16,000 $16,000 11.5 Comp. Rec., Park, & Open Space Plans (COMM)
$40,000 COMM_Key
Washington North Strabane Township
Municipal Center Park
BRC-‐PRD-‐7-‐139
$99,826 $100,000 7 Park Rehabilitation and Development (COMM)
$249,565 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 527 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Washington North Strabane Township
Municipal Center Park-‐Phase II
KEY-‐PRD-‐2-‐113
$55,000 $55,000 2 Park Rehabilitation and Development (COMM)
$110,000 COMM_Key
Washington North Strabane Township
Municipal Park -‐ Phase I
BRC-‐PRD-‐14-‐159
$270,000 $270,000 14 Park Rehabilitation and Development (COMM)
$620,000 COMM_Key
Washington Nottingham Township
Sherwood Park BRC-‐SC-‐11-‐140
$20,000 $20,000 11 Small Communities/Small Projects (COMM)
$27,800 COMM_Key
Washington Nottingham Township
Township Park BRC-‐SC-‐6-‐132
$20,000 $20,000 6 Small Communities/Small Projects (COMM)
$40,336 COMM_Key
Washington Peters Township Arrowhead Trail Expansion
BRC-‐RTD-‐7-‐11
$101,250 $69,000 7 Rail Rehabilitation and Development (RT)
$202,500 RT_Key
Washington Peters Township PAWC Reservoir KEY-‐ACQ-‐1-‐106
$100,000 $100,000 1 Acquisition (COMM)
$1,621,400 COMM_Key
Washington Peters Township Pool, Recreation Center, & Skateboard Facility
BRC-‐TAG-‐6-‐144
$10,000 $10,000 6 Feasibility Studies (COMM)
$20,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 528 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Washington Somerset Township Somerset Township Park
BRC-‐SC-‐8-‐178
$26,000 $26,000 8 Small Communities/Small Projects (COMM)
$38,500 COMM_Key
Washington South Strabane Township
Community Park -‐ Phase III
BRC-‐PRD-‐14-‐172
$71,600 $71,600 14 Park Rehabilitation and Development (COMM)
$143,300 COMM_Key
Washington South Strabane Township
Community Park-‐ Phase 4 -‐ Development
BRC-‐PRD-‐17-‐151
$100,662 $100,600 17 Park Rehabilitation and Development (COMM)
$201,324 COMM_Key
Washington South Strabane Township
Laboratory Park KEY-‐PRD-‐3-‐200
$14,900 $14,900 3 Park Rehabilitation and Development (COMM)
$29,900 COMM_Key
Washington South Strabane Township
Zediker Station Park BRC-‐PRD-‐7-‐176
$218,400 $218,000 7 Park Rehabilitation and Development (COMM)
$436,800 COMM_Key
Washington Trust for Public Land Peters Township Reservoir
KEY-‐LTA-‐1-‐15
$675,000 $400,000 1 Critical Habitat Acquisition (LT)
$1,600,000 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 529 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Washington Union Township Brownsville Road Park
BRC-‐PRD-‐6-‐181
$55,000 $55,000 6 Park Rehabilitation and Development (COMM)
$110,000 COMM_Key
Washington Union Township Pleasant Stream Park KEY-‐PRD-‐2-‐159
$19,700 $19,700 2 Park Rehabilitation and Development (COMM)
$39,500 COMM_Key
Washington Washington City Multi-‐Municipal Comprehensive Recreation, Open Space & Greenway Plan
BRC-‐TAG-‐16-‐75
$75,000 $75,000 16 Comp. Rec., Park, & Open Space Plans (COMM)
$150,000 COMM_Key
Washington Washington City Three Sites KEY-‐PRD-‐2-‐166
$112,810 $112,800 2 Park Rehabilitation and Development (COMM)
$244,260 COMM_Key
Washington Washington City Washington City Park
BRC-‐PRD-‐10-‐142
$10,000 $10,000 10 Park Rehabilitation and Development (COMM)
$28,500 COMM_Key
Washington Washington City Washington Park Multi-‐Purpose Rec. Facility
BRC-‐PRD-‐8-‐207
$300,000 $200,000 8 Park Rehabilitation and Development (COMM)
$1,100,800 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 530 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Washington Washington County Comprehensive Rec., Park and Open Space
KEY-‐TAG-‐3-‐227
$30,000 $30,000 3 Comp. Rec., Park, & Open Space Plans (COMM)
$60,000 COMM_Key
Washington Washington County Henry House KEY-‐PRD-‐1-‐144
$28,000 $28,000 1 Park Rehabilitation and Development (COMM)
$70,000 COMM_Key
Washington Washington County Mingo and Cross Creek Parks
BRC-‐PRD-‐11-‐97
$54,500 $54,500 11 Park Rehabilitation and Development (COMM)
$109,000 COMM_Key
Washington Washington County Mingo Creek County Park
BRC-‐PRD-‐7-‐199
$160,000 $160,000 7 Park Rehabilitation and Development (COMM)
$320,000 COMM_Key
Washington Washington County Panhandle Trail BRC-‐RTD-‐14-‐180
$65,000 $65,000 14 Rail Rehabilitation and Development (RT)
$465,000 RT_Key
Washington Washington County Panhandle Trail BRC-‐RTD-‐6-‐21
$55,000 $50,000 6 Rail Rehabilitation and Development (RT)
$597,000 RT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 531 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Washington Washington County Panhandle Trail-‐Station St. -‐ Dinsmore Road
BRC-‐RTD-‐10-‐15
$70,000 $70,000 10 Rail Rehabilitation and Development (RT)
$140,000 RT_Key
Washington Washington County Ten Mile Park KEY-‐PRD-‐5-‐213
$25,000 $25,000 5 Park Rehabilitation and Development (COMM)
$50,000 COMM_Key
Washington Washington County Washington County Greenways & Open Space Plan
BRC-‐TAG-‐11-‐238
$55,000 $55,000 11 Greenway Plans (COMM)
$110,000 COMM_Key
Washington Washington County Watershed Alliance
Upper Chartiers Creek Watershed Plan
BRC-‐RCP-‐6-‐21
$64,000 $64,000 6 Planning (RIV) $108,000 RIVER_Key
Wayne Bethany Borough Bethany Borough Park Enhancement
BRC-‐SC-‐10-‐67
$30,000 $30,000 10 Small Communities/Small Projects (COMM)
$35,000 COMM_Key
Wayne Bethany Borough Bethany Park Playground Rehabilitation
BRC-‐SC-‐12-‐83
$30,000 $30,000 12 Small Communities/Small Projects (COMM)
$40,000 COMM_Key
Wayne Bethany Borough Central Wayne Comprehensive Recreation, Open Space and Greenway Plan
BRC-‐TAG-‐15-‐86
$36,200 $36,200 15 Comp. Rec., Park, & Open Space Plans (COMM)
$211,200 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 532 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Wayne Damascus Township Damascus Recreation Complex
KEY-‐SC-‐5-‐42 $20,000 $20,000 5 Small Communities/Small Projects (COMM)
$20,969 COMM_Key
Wayne Damascus Township Damascus Recreational Complex
KEY-‐SC-‐4-‐40 $20,000 $20,000 4 Small Communities/Small Projects (COMM)
$21,346 COMM_Key
Wayne Dreher Township Carlton Drake Memorial Park Addn.
BRC-‐ACQ-‐6-‐55
$72,210 $30,000 6 Acquisition (COMM)
$144,420 COMM_Key
Wayne Dreher Township Township Park Master Site Plan
BRC-‐TAG-‐8-‐58
$14,000 $14,000 8 Master Site Plans (COMM)
$28,000 COMM_Key
Wayne Hawley Borough Bingham Park KEY-‐SC-‐3-‐84 $20,000 $20,000 3 Small Communities/Small Projects (COMM)
$21,900 COMM_Key
Wayne Hawley Borough Riverside Park KEY-‐PRD-‐4-‐65
$60,670 $60,000 4 Park Rehabilitation and Development (COMM)
$124,955 COMM_Key
Wayne Hawley Borough Skate Park BRC-‐SC-‐11-‐127
$40,000 $40,000 11 Small Communities/Small Projects (COMM)
$55,900 COMM_Key
Wayne Lacawac Sanctuary Foundation, Inc.
Lacawac Sanctuary Master Site Plan
BRC-‐LTP-‐13.3-‐477
$26,000 $26,000 13.3 Master Site Plans (COMM)
$52,000 LT_Key
Wayne Lacawac Sanctuary Foundation, Inc.
Ledges Tract KEY-‐LTA-‐2-‐4 $255,300 $225,000 2 Critical Habitat Acquisition (LT)
$450,000 LT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 533 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Wayne Lacawac Sanctuary Foundation, Inc.
Reed Property Acquisition
BRC-‐LTA-‐8-‐7
$373,800 $150,000 8 Critical Habitat Acquisition (LT)
$747,500 LT_Key
Wayne Lacawac Sanctuary Foundation, Inc.
Rizza Property BRC-‐LTA-‐7-‐11
$44,600 $17,000 7 Open Space Acquisition (LT)
$89,200 LT_Key
Wayne Lehigh Township Union Park KEY-‐SC-‐4-‐82 $20,000 $20,000 4 Small Communities/Small Projects (COMM)
$26,419 COMM_Key
Wayne Natural Lands Trust, Inc.
Goose Pond BRC-‐LTA-‐7-‐13
$505,000 $250,000 7 Critical Habitat Acquisition (LT)
$1,035,000 LT_Key
Wayne Natural Lands Trust, Inc.
Goose Pond Conservation Easement
BRC-‐LTA-‐8-‐9
$250,000 $250,000 8 Critical Habitat Acquisition (LT)
$1,000,000 LT_Key
Wayne Paupack Township Christophersen Land Acquisition
BRC-‐ACQ-‐16-‐27
$33,790 $33,700 16 Acquisition (COMM)
$67,580 COMM_Key
Wayne Paupack Township Lakeville Recreation Complex
BRC-‐SC-‐9-‐160
$40,000 $39,000 9 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Wayne Paupack Township Lakeville Recreation Complex
KEY-‐SC-‐5-‐156
$20,000 $20,000 5 Small Communities/Small Projects (COMM)
$23,964 COMM_Key
Wayne Paupack Township Lakeville Recreation Complex -‐ Playground Renovation
BRC-‐SC-‐12-‐113
$20,000 $20,000 12 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 534 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Wayne Paupack Township Multi-‐Municipal Recreation and Park Plan
BRC-‐TAG-‐11.5-‐29
$30,000 $30,000 11.5 Comp. Rec., Park, & Open Space Plans (COMM)
$60,000 COMM_Key
Wayne Paupack Township Paupack Recreational Complex
KEY-‐SC-‐2-‐116
$19,779 $19,700 2 Small Communities/Small Projects (COMM)
$21,729 COMM_Key
Wayne Paupack Township Picnic Pavilion BRC-‐SC-‐7-‐149
$20,056 $20,000 7 Small Communities/Small Projects (COMM)
$20,056 COMM_Key
Wayne Starrucca Borough Borough Park KEY-‐SC-‐3-‐207
$15,300 $15,300 3 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Wayne Wayne County County Park & Recreation Complex
BRC-‐TAG-‐13-‐210
$15,000 $15,000 13 Master Site Plans (COMM)
$30,000 COMM_Key
Wayne Wayne County Recreation Complex -‐ Development
BRC-‐PRD-‐17-‐160
$40,000 $40,000 17 Park Rehabilitation and Development (COMM)
$80,000 COMM_Key
Wayne Wayne County Conservation District
Reinings Pond Feasibility/Master Site Plan
BRC-‐TAG-‐9-‐226
$20,000 $20,000 9 Feasibility Studies (COMM)
$41,300 COMM_Key
Westmoreland Allegheny Township Community Park KEY-‐ACQ-‐3-‐7
$26,200 $25,000 3 Acquisition (COMM)
$52,400 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 535 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Westmoreland Allegheny Township Finnin Park BRC-‐PRD-‐6-‐10
$36,500 $36,500 6 Park Rehabilitation and Development (COMM)
$73,000 COMM_Key
Westmoreland Allegheny Township Tredway Trail Extension
BRC-‐ACQ-‐15-‐41
$155,000 $155,000 15 Acquisition (COMM)
$310,000 COMM_Key
Westmoreland Allegheny Township Tredway Trail Extension -‐ Phase II -‐ Acquisition
BRC-‐ACQ-‐18-‐3
$160,000 $160,000 18 Acquisition (COMM)
$320,000 COMM_Key
Westmoreland Allegheny Township Wynn & Clara Tredway River Park
BRC-‐RTD-‐9-‐13
$89,000 $89,000 9 Rail Rehabilitation and Development (RT)
$178,000 RT_Key
Westmoreland Arnold City Kennedy Riverside Park
BRC-‐PRD-‐10-‐110
$205,000 $150,000 10 Park Rehabilitation and Development (COMM)
$410,000 COMM_Key
Westmoreland Arnold City Roosevelt Park KEY-‐PRD-‐1-‐5
$75,000 $75,000 1 Park Rehabilitation and Development (COMM)
$153,535 COMM_Key
Westmoreland Arona Borough Community Park BRC-‐SC-‐8-‐17
$20,200 $20,000 8 Small Communities/Small Projects (COMM)
$30,100 COMM_Key
Westmoreland Avonmore Borough Avonmore Canoe Launch
BRC-‐RCD-‐8-‐24
$10,000 $10,000 8 Development (RIV)
$20,000 RIVER_Key
Keystone Fund Projects by County (1994-‐2013)
Page 536 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Westmoreland Avonmore Borough Community Park KEY-‐SC-‐4-‐11 $12,450 $12,500 4 Small Communities/Small Projects (COMM)
$17,450 COMM_Key
Westmoreland Bolivar Borough Kelly Field KEY-‐SC-‐1-‐13 $20,000 $20,000 1 Small Communities/Small Projects (COMM)
$32,150 COMM_Key
Westmoreland Delmont Borough Newhouse Park -Development
BRC-SC-19-36
$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)
$60,000.00 COMM_Key
Westmoreland Delmont Borough Newhouse Park -Development
BRC-SC-19-36
$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)
$60,000.00 COMM_Key
Westmoreland Delmont Borough Newhouse Park -Development
BRC-SC-19-36
$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)
$60,000.00 COMM_Key
Westmoreland Derry Area Recreation Board
Peer to Peer BRC-‐TAG-‐12-‐2
$10,000 $10,000 12 Peer-‐to-‐Peer Tech. Assistance (COMM)
$11,000 COMM_Key
Westmoreland Derry Borough Derry Community Pool
BRC-‐PRD-‐6-‐52
$100,000 $225,000 6 Park Rehabilitation and Development (COMM)
$450,000 COMM_Key
Westmoreland Derry Borough Lake Ethel Trail KEY-‐SC-‐5-‐45 $20,000 $20,000 5 Small Communities/Small Projects (COMM)
$30,400 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 537 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Westmoreland Export Borough J.M. Hall, Jr. Park Master Site Plan
BRC-TAG-19-132
$15,400.00 $15,400.00 19 Master Site Plans (COMM)
$30,800.00 COMM_Key
Westmoreland Export Borough J.M. Hall, Jr. Park Master Site Plan
BRC-TAG-19-132
$15,400.00 $15,400.00 19 Master Site Plans (COMM)
$30,800.00 COMM_Key
Westmoreland Export Borough J.M. Hall, Jr. Park Master Site Plan
BRC-TAG-19-132
$15,400.00 $15,400.00 19 Master Site Plans (COMM)
$30,800.00 COMM_Key
Westmoreland Greensburg City Kirk S. Nevin Ice Rink BRC-‐PRD-‐14-‐143
$43,400 $43,400 14 Park Rehabilitation and Development (COMM)
$86,800 COMM_Key
Westmoreland Greensburg City Lynch Field KEY-‐PRD-‐2-‐54
$25,500 $25,500 2 Park Rehabilitation and Development (COMM)
$51,367 COMM_Key
Westmoreland Greensburg City Lynch Field Renovation
BRC-‐PRD-‐10-‐119
$21,736 $20,000 10 Park Rehabilitation and Development (COMM)
$43,472 COMM_Key
Westmoreland Greensburg City St. Clair Park KEY-‐PRD-‐5-‐76
$43,388 $43,000 5 Park Rehabilitation and Development (COMM)
$86,775 COMM_Key
Westmoreland Greensburg City University Center for the Arts
BRC-‐PRD-‐12-‐156
$400,000 $200,000 12 Park Rehabilitation and Development (COMM)
$13,697,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 538 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Westmoreland Hempfield Township Community Park KEY-‐ACQ-‐5-‐85
$92,988 $65,000 5 Acquisition (COMM)
$185,975 COMM_Key
Westmoreland Hempfield Township Playgrounds -‐ Eleven Sites
KEY-‐PRD-‐1-‐60
$144,265 $100,000 1 Park Rehabilitation and Development (COMM)
$288,531 COMM_Key
Westmoreland Hempfield Township Seven Sites KEY-‐PRD-‐3-‐86
$100,000 $100,000 3 Park Rehabilitation and Development (COMM)
$218,000 COMM_Key
Westmoreland Hunker Borough Two Sites KEY-‐SC-‐5-‐91 $20,000 $20,000 5 Small Communities/Small Projects (COMM)
$21,833 COMM_Key
Westmoreland Irwin Borough Irwin Borough Street Scapes and Gateways
BRC-‐PRD-‐12.5-‐32
$350,000 $350,000 12.5 Park Rehabilitation and Development (COMM)
$2,313,750 COMM_Key
Westmoreland Irwin Borough Irwin Park BRC-‐SC-‐6-‐87
$20,000 $20,000 6 Small Communities/Small Projects (COMM)
$33,515 COMM_Key
Westmoreland Irwin Borough Irwin Park and Penglyn Field
BRC-‐SC-‐10-‐84
$40,000 $30,000 10 Small Communities/Small Projects (COMM)
$60,100 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 539 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Westmoreland Jeannette City West Jeannette Park KEY-‐PRD-‐5-‐96
$138,822 $138,800 5 Park Rehabilitation and Development (COMM)
$657,430 COMM_Key
Westmoreland Latrobe City Legion-‐Keener Park KEY-‐PRD-‐3-‐108
$88,000 $88,000 3 Park Rehabilitation and Development (COMM)
$176,000 COMM_Key
Westmoreland Latrobe City Lincoln Avenue Trail & Greenway Park - Development
BRC-RTD-19-153
$250,000.00 $250,000.00 19 Rail Rehabilitation and Development (RT)
$500,025.00 COMM_Key
Westmoreland Latrobe City Lincoln Avenue Trail & Greenway Park - Development
BRC-RTD-19-153
$250,000.00 $250,000.00 19 Rail Rehabilitation and Development (RT)
$500,025.00 COMM_Key
Westmoreland Latrobe City Lincoln Avenue Trail & Greenway Park - Development
BRC-RTD-19-153
$250,000.00 $250,000.00 19 Rail Rehabilitation and Development (RT)
$500,025.00 COMM_Key
Westmoreland Latrobe City Lincoln Avenue Trail & Greenway Park - Development
BRC-RTD-19-153
$250,000.00 $250,000.00 19 Rail Rehabilitation and Development (RT)
$500,025.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 540 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Westmoreland Latrobe-‐Unity Youngstown Parks & Recreation Commission
Cardinal Park -‐ Phase 2 -‐ Development
BRC-‐PRD-‐16-‐143
$103,500 $103,500 16 Park Rehabilitation and Development (COMM)
$207,000 COMM_Key
Westmoreland Latrobe-‐Unity Youngstown Parks & Recreation Commission
Cardinal Park-‐Phase 3-‐ Development
BRC-‐PRD-‐18-‐79
$79,956 $80,000 18 Park Rehabilitation and Development (COMM)
$159,956 COMM_Key
Westmoreland Latrobe-‐Unity Youngstown Parks & Recreation Commission
John Street Parklet-‐-‐ Development
BRC-‐PRD-‐17-‐129
$18,900 $18,900 17 Park Rehabilitation and Development (COMM)
$37,900 COMM_Key
Westmoreland Latrobe-‐Unity Youngstown Parks & Recreation Commission
Unity Park-‐ Phase II BRC-‐PRD-‐13-‐381
$180,700 $180,700 13 Park Rehabilitation and Development (COMM)
$361,500 COMM_Key
Westmoreland Latrobe-‐Unity Youngstown Parks & Recreation Commission
Unity-‐Hillside-‐Cardinal-‐Central-‐Pleasant Unity Parks
BRC-‐PRD-‐12-‐166
$350,000 $300,000 12 Park Rehabilitation and Development (COMM)
$700,000 COMM_Key
Westmoreland Ligonier Township Conservation and Walking Trail
BRC-‐PRD-‐7-‐101
$58,570 $55,000 7 Park Rehabilitation and Development (COMM)
$113,570 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 541 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Westmoreland Lower Burrell City Wolf Pak Park BRC-‐ACQ-‐7-‐105
$91,900 $91,000 7 Acquisition (COMM)
$183,800 COMM_Key
Westmoreland Loyalhanna Township
Elrico Playground BRC-‐SC-‐12-‐106
$27,000 $26,900 12 Small Communities/Small Projects (COMM)
$33,900 COMM_Key
Westmoreland Loyalhanna Watershed Association, Inc.
Keystone Run AMD Education Interpretation
BRC-‐RCD-‐6-‐18
$25,000 $25,000 6 Development (RIV)
$50,000 RIVER_Key
Westmoreland Loyalhanna Watershed Association, Inc.
Linn Run Loop -‐ PW&S Railroad Bike Trail
KEY-‐RTD-‐95-‐18
$35,000 $35,000 1 Rail Rehabilitation and Development (RT)
$85,000 RT_Key
Westmoreland Madison Borough Madison Park BRC-‐SC-‐6-‐103
$14,900 $15,000 6 Small Communities/Small Projects (COMM)
$20,400 COMM_Key
Westmoreland Monessen City City Park -‐ Phase 1 -‐ Development
BRC-‐PRD-‐17-‐139
$250,000 $250,000 17 Park Rehabilitation and Development (COMM)
$500,000 COMM_Key
Westmoreland Monessen City Monessen Parks Improvement Project -‐ 5 Parks
BRC-‐PRD-‐9-‐136
$71,600 $70,000 9 Park Rehabilitation and Development (COMM)
$165,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 542 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Westmoreland Mount Pleasant Borough
Veterans' Park Extension
BRC-‐SC-‐8-‐125
$40,000 $40,000 8 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Westmoreland Murrysville Municipality
Chambers Park KEY-‐PRD-‐1-‐90
$15,000 $15,000 1 Park Rehabilitation and Development (COMM)
$30,050 COMM_Key
Westmoreland Murrysville Municipality
Townsend and PV Master Site Plans
BRC-‐TAG-‐6-‐121
$35,000 $35,000 6 Master Site Plans (COMM)
$70,000 COMM_Key
Westmoreland Murrysville Municipality
Townsend Park-‐Development
BRC-‐PRD-‐18-‐85
$42,000 $42,000 18 Park Rehabilitation and Development (COMM)
$84,000 COMM_Key
Westmoreland New Alexandria Borough
Borough Park KEY-‐SC-‐5-‐142
$20,000 $20,000 5 Small Communities/Small Projects (COMM)
$25,853 COMM_Key
Westmoreland New Kensington City Comp Park & Rec Plan
BRC-‐TAG-‐8-‐130
$20,000 $20,000 8 Comp. Rec., Park, & Open Space Plans (COMM)
$40,000 COMM_Key
Westmoreland New Kensington City Memorial Park Improvements
BRC-‐PRD-‐8-‐131
$80,000 $80,000 8 Park Rehabilitation and Development (COMM)
$160,900 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 543 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Westmoreland New Kensington City Six Sites KEY-‐PRD-‐4-‐113
$140,000 $100,000 4 Park Rehabilitation and Development (COMM)
$280,000 COMM_Key
Westmoreland New Stanton Borough
Community Park KEY-‐SC-‐5-‐146
$19,902 $20,000 5 Small Communities/Small Projects (COMM)
$19,902 COMM_Key
Westmoreland North Belle Vernon Borough
Graham Street Park KEY-‐SC-‐3-‐153
$19,700 $19,700 3 Small Communities/Small Projects (COMM)
$19,700 COMM_Key
Westmoreland North Belle Vernon Borough
Graham Street Park KEY-‐SC-‐5-‐150
$20,000 $20,000 5 Small Communities/Small Projects (COMM)
$40,100 COMM_Key
Westmoreland North Huntingdon Township
Regional Recreation Feasibility Study
BRC-‐TAG-‐13.6-‐600
$15,000 $15,000 13.6 Feasibility Studies (COMM)
$35,000 COMM_Key
Westmoreland North Huntingdon Township
Three Sites KEY-‐PRD-‐3-‐155
$20,000 $20,000 3 Park Rehabilitation and Development (COMM)
$40,000 COMM_Key
Westmoreland Oklahoma Borough Borough Park KEY-‐SC-‐3-‐161
$20,000 $20,000 3 Small Communities/Small Projects (COMM)
$21,800 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 544 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Westmoreland Penn Township Penn-‐Trafford Peer BRC-‐TAG-‐7-‐5
$7,500 $7,500 7 Peer-‐to-‐Peer Tech. Assistance (COMM)
$8,250 COMM_Key
Westmoreland Penn Trafford Area Recreation Commission
Demonstration Playground Conduit Grant
BRC-‐PRD-‐11-‐65
$116,000 $116,000 11 Park Rehabilitation and Development (COMM)
$171,500 COMM_Key
Westmoreland Penn Trafford Area Recreation Commission
Demonstration Playground Conduit Grant
BRC-‐PRD-‐9-‐162
$95,400 $95,000 9 Park Rehabilitation and Development (COMM)
$161,440 COMM_Key
Westmoreland Penn Trafford Area Recreation Commission
Level Green, 6th & Cavitt, Penn Parks
BRC-‐PRD-‐13-‐133
$202,300 $200,000 13 Park Rehabilitation and Development (COMM)
$376,400 COMM_Key
Westmoreland Penn Trafford Area Recreation Commission
Penn Township Municipal Park and Mt. Manor Park -‐ Development
BRC-‐PRD-‐16-‐153
$350,105 $305,600 16 Park Rehabilitation and Development (COMM)
$680,417 COMM_Key
Westmoreland Penn Trafford Area Recreation Commission
Penn Township Municipal Park Master Site Plan
BRC-‐TAG-‐11-‐230
$23,100 $15,000 11 Master Site Plans (COMM)
$46,200 COMM_Key
Westmoreland Penn Trafford Area Recreation Commission
Sunrise Park Master Site Plan
BRC-‐TAG-‐10-‐164
$16,400 $16,000 10 Master Site Plans (COMM)
$32,800 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 545 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Westmoreland Penn Trafford Area Recreation Commission
Trafford B-‐Y and Penn Parks
BRC-‐SC-‐14-‐99
$80,000 $80,000 14 Small Communities/Small Projects (COMM)
$120,000 COMM_Key
Westmoreland Regional Trail Corporation
Coal and Coke Trail BRC-‐RTA-‐7-‐14
$19,500 $19,500 7 Acquisition (RT) $39,000 RT_Key
Westmoreland Regional Trail Corporation
Coal and Coke Trail BRC-‐RTD-‐9-‐10
$117,000 $100,000 9 Rail Rehabilitation and Development (RT)
$375,000 RT_Key
Westmoreland Regional Trail Corporation
Westmoreland Yough Trail Chapter of RTC
BRC-‐PRT-‐6-‐26
$18,400 $18,400 6 Maintenance and Restoration
$23,000 RIVER_Key
Westmoreland Regional Trail Corporation
Youghiogheny River Environmental Educational Ctr.
KEY-‐RCD-‐5-‐17
$100,000 $110,000 5 Development (RIV)
$263,600 RIVER_Key
Westmoreland Rostraver Township Comprehensive Recreation, Park and Open Space Plan
BRC-‐TAG-‐12.5-‐22
$14,900 $14,900 12.5 Comp. Rec., Park, & Open Space Plans (COMM)
$29,800 COMM_Key
Westmoreland Rostraver Township DiVirgilio Sports Complex
BRC-‐PRD-‐11-‐76
$80,000 $80,000 11 Park Rehabilitation and Development (COMM)
$160,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 546 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Westmoreland Rostraver Township Recreation Park KEY-‐PRD-‐2-‐133
$100,000 $100,000 2 Park Rehabilitation and Development (COMM)
$285,000 COMM_Key
Westmoreland Salem Township Salem Township Recreation Park
BRC-‐TAG-‐7-‐169
$20,000 $20,000 7 Master Site Plans (COMM)
$40,000 COMM_Key
Westmoreland Salem Township Seanor Central Park KEY-‐ACQ-‐5-‐176
$262,500 $150,000 5 Acquisition (COMM)
$523,500 COMM_Key
Westmoreland Salem Township Seanor Farm Park -‐Phase 1A -‐Development
BRC-‐PRD-‐18-‐96
$218,230 $218,000 18 Park Rehabilitation and Development (COMM)
$436,461 COMM_Key
Westmoreland Scott Conservancy King Nature Reserve KEY-‐LTA-‐3-‐20
$126,000 $90,000 3 Open Space Acquisition (LT)
$240,000 LT_Key
Westmoreland Scottdale Borough Jacob's Creek Walking Trail
KEY-‐PRD-‐3-‐192
$17,500 $17,500 3 Park Rehabilitation and Development (COMM)
$35,000 COMM_Key
Westmoreland Scottdale Borough Kendi and Barclay Parks
BRC-‐PRD-‐9-‐182
$185,000 $197,500 9 Park Rehabilitation and Development (COMM)
$395,000 COMM_Key
Westmoreland Scottdale Borough Loucks Park BRC-‐SC-‐12-‐122
$40,000 $40,000 12 Small Communities/Small Projects (COMM)
$63,100 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 547 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Westmoreland Scottdale Borough Park Playground and Facilities
BRC-‐PRD-‐7-‐170
$271,749 $120,000 7 Park Rehabilitation and Development (COMM)
$543,500 COMM_Key
Westmoreland Seward Borough Borough Park BRC-‐SC-‐6-‐163
$20,000 $20,000 6 Small Communities/Small Projects (COMM)
$24,000 COMM_Key
Westmoreland Seward Borough Memorial Park BRC-‐SC-‐7-‐172
$10,680 $20,000 7 Small Communities/Small Projects (COMM)
$26,595 COMM_Key
Westmoreland Sewickley Creek Watershed Association, Inc.
Sewickley Creek Watershed Plan
BRC-‐RCP-‐6-‐19
$85,000 $85,000 6 Planning (RIV) $171,400 RIVER_Key
Westmoreland Sewickley Township Crabapple Lake Park l
KEY-‐PRD-‐3-‐193
$64,600 $64,600 3 Park Rehabilitation and Development (COMM)
$129,300 COMM_Key
Westmoreland Sewickley Township JPG Park BRC-‐PRD-‐8-‐169
$47,400 $47,500 8 Park Rehabilitation and Development (COMM)
$105,000 COMM_Key
Westmoreland Sewickley Township JPG Park BRC-‐PRD-‐8-‐169
$47,400 $5,000 8 Park Rehabilitation and Development (COMM)
$105,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 548 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Westmoreland Sewickley Township Recreation Center KEY-‐PRD-‐1-‐123
$26,246 $10,000 1 Park Rehabilitation and Development (COMM)
$52,492 COMM_Key
Westmoreland The Conservation Fund
Lazar (Bushy Run Battlefield)
BRC-‐LTA-‐10-‐18
$407,500 $200,000 10 Open Space Acquisition (LT)
$815,000 LT_Key
Westmoreland Trafford Borough B-‐Y Park KEY-‐PRD-‐2-‐157
$142,250 $139,000 2 Park Rehabilitation and Development (COMM)
$284,500 COMM_Key
Westmoreland Vandergrift Borough Vandergrift Community Swimming Pool
BRC-‐PRD-‐8-‐205
$104,200 $104,000 8 Park Rehabilitation and Development (COMM)
$208,500 COMM_Key
Westmoreland Washington Township
Kunkle Park BRC-‐PRD-‐7-‐201
$100,000 $100,000 7 Park Rehabilitation and Development (COMM)
$200,000 COMM_Key
Westmoreland West Leechburg Borough
Memorial Park KEY-‐SC-‐2-‐173
$18,600 $18,600 2 Small Communities/Small Projects (COMM)
$24,100 COMM_Key
Westmoreland West Newton Borough
Borough Park KEY-‐SC-‐1-‐148
$14,925 $14,900 1 Small Communities/Small Projects (COMM)
$21,925 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 549 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Westmoreland West Newton Borough
Goerhing Park Playground
BRC-‐SC-‐11-‐164
$20,000 $20,000 11 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Westmoreland Western Pennsylvania Conservancy
Chestnut Ridge Acquisition
BRC-‐LTA-‐8-‐20
$205,300 $205,000 8 Critical Habitat Acquisition (LT)
$410,600 LT_Key
Westmoreland Western Pennsylvania Conservancy
Randall Reserve Conservation Easement
BRC-‐LTA-‐13-‐35
$79,500 $79,500 13 Critical Habitat Acquisition (LT)
$159,000 LT_Key
Westmoreland Westmoreland Conservancy
AJSE Property BRC-‐LTA-‐7-‐24
$34,500 $34,000 7 Critical Habitat Acquisition (LT)
$68,000 LT_Key
Westmoreland Westmoreland County
Comprehensive Recreation Park and Open S
KEY-‐TAG-‐3-‐238
$40,000 $40,000 3 Comp. Rec., Park, & Open Space Plans (COMM)
$80,000 COMM_Key
Westmoreland Westmoreland County
Five Star Trail BRC-‐PRD-‐8-‐215
$45,000 $45,000 8 Park Rehabilitation and Development (COMM)
$720,000 COMM_Key
Westmoreland Westmoreland County
Five Star Trail Development
KEY-‐RTD-‐3-‐25
$50,000 $50,000 3 Rail Rehabilitation and Development (RT)
$345,000 RT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 550 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Westmoreland Westmoreland County
Little Crabtree Creek Trail -‐ Phase I -‐ Development
BRC-‐PRD-‐18-‐179
$284,400 $177,000 18 Park Rehabilitation and Development (COMM)
$355,500 COMM_Key
Westmoreland Westmoreland County
Natural Heritage Inventory
KEY-‐TAG-‐1-‐149
$30,000 $25,000 1 Natural Areas Inventories (COMM)
$60,000 COMM_Key
Westmoreland Westmoreland County
Twin Lakes Park BRC-‐PRD-‐13-‐173
$325,000 $100,000 13 Park Rehabilitation and Development (COMM)
$650,000 COMM_Key
Westmoreland Westmoreland County
Westmoreland Land Trust Acquisitions -‐ Phase II
BRC-‐ACQ-‐16-‐29
$166,263 $166,000 16 Acquisition (COMM)
$332,526 COMM_Key
Wyoming Clinton Township Joint Municipal Park -‐ Development
BRC-‐SC-‐16-‐40
$40,000 $40,000 16 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
Wyoming Clinton Township Joint Municipal Park Project Phase II
BRC-PRD-19-203
$236,000.00 $170,000.00 19 Park Rehabilitation and Development (COMM)
$472,000.00 COMM_Key
Wyoming Clinton Township Joint Municipal Park Project Phase II
BRC-PRD-19-203
$236,000.00 $170,000.00 19 Park Rehabilitation and Development (COMM)
$472,000.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 551 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Wyoming Clinton Township Joint Municipal Park Project Phase II
BRC-PRD-19-203
$236,000.00 $170,000.00 19 Park Rehabilitation and Development (COMM)
$472,000.00 COMM_Key
Wyoming Exeter Township George R. Hock Community Park
KEY-‐SC-‐5-‐65 $20,000 $20,000 5 Small Communities/Small Projects (COMM)
$26,491 COMM_Key
Wyoming Exeter Township George R. Hock Memorial Park Rehabilitation
BRC-‐SC-‐12-‐94
$20,000 $20,000 12 Small Communities/Small Projects (COMM)
$29,200 COMM_Key
Wyoming Factoryville Borough Christy Mathewson Park -‐ Development
BRC-‐SC-‐17-‐36
$20,000 $22,000 17 Small Communities/Small Projects (COMM)
$22,000 COMM_Key
Wyoming Factoryville Borough Christy Mathewson Park – Development
BRC-SC-19-41
$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)
$60,000.00 COMM_Key
Wyoming Factoryville Borough Christy Mathewson Park – Development
BRC-SC-19-41
$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)
$60,000.00 COMM_Key
Wyoming Factoryville Borough Christy Mathewson Park – Development
BRC-SC-19-41
$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)
$60,000.00 COMM_Key
Wyoming Factoryville Borough Christy Mathewson Recreational Complex
KEY-‐SC-‐2-‐48 $20,000 $20,000 2 Small Communities/Small Projects (COMM)
$26,550 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 552 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Wyoming Factoryville Borough Joint Municipal Park BRC-‐PRD-‐10-‐116
$215,000 $165,000 10 Park Rehabilitation and Development (COMM)
$430,000 COMM_Key
Wyoming Factoryville Borough Joint Municipal Park Acquisition
BRC-‐ACQ-‐8-‐68
$43,300 $43,000 8 Acquisition (COMM)
$86,700 COMM_Key
Wyoming Factoryville Borough Municipal Park BRC-‐SC-‐13.3-‐300
$20,000 $20,000 13.3 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
Wyoming Forkston Township Creek Junction Park BRC-‐SC-‐14-‐85
$30,000 $30,000 14 Small Communities/Small Projects (COMM)
$40,000 COMM_Key
Wyoming Mehoopany Township
Mehoopany Township Community Park Renovation
BRC-‐SC-‐12-‐108
$26,000 $26,000 12 Small Communities/Small Projects (COMM)
$32,000 COMM_Key
Wyoming Monroe Township Beaumont Park Improvements
BRC-‐SC-‐12-‐110
$30,100 $30,100 12 Small Communities/Small Projects (COMM)
$40,200 COMM_Key
Wyoming Monroe Township Monroe Township Community Park
BRC-‐SC-‐7-‐131
$28,175 $28,000 7 Small Communities/Small Projects (COMM)
$36,350 COMM_Key
Wyoming Nicholson Borough Nordahl Park Rehabilitation
BRC-‐SC-‐10-‐92
$24,800 $28,000 10 Small Communities/Small Projects (COMM)
$32,800 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 553 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
Wyoming North Branch Land Trust
Camp Lackawanna Easement
BRC-‐LTA-‐12-‐36
$266,800 $265,000 12 Open Space Acquisition (LT)
$533,500 LT_Key
Wyoming Overfield Township Overfield Township Park
BRC-‐SC-‐11-‐143
$40,000 $40,000 11 Small Communities/Small Projects (COMM)
$62,000 COMM_Key
Wyoming The Conservation Fund
State Game Land #57 Indenture (Yocum Property)
BRC-‐LTA-‐7-‐18
$32,090 $32,000 7 Open Space Acquisition (LT)
$64,180 LT_Key
Wyoming Tunkhannock Borough
Riverside Park KEY-‐SC-‐1-‐137
$20,000 $20,000 1 Small Communities/Small Projects (COMM)
$25,730 COMM_Key
Wyoming Tunkhannock Township
Lazy Brook Park KEY-‐PRD-‐4-‐151
$50,000 $50,000 4 Park Rehabilitation and Development (COMM)
$100,000 COMM_Key
Wyoming Tunkhannock Township
Lazybrook Park BRC-‐SC-‐8-‐193
$20,000 $20,000 8 Small Communities/Small Projects (COMM)
$40,000 COMM_Key
Wyoming Tunkhannock Township
Lazybrook Park-‐Development
BRC-‐SC-‐15-‐83
$30,000 $30,000 15 Small Communities/Small Projects (COMM)
$52,015 COMM_Key
Wyoming Washington Township
Township Park BRC-‐SC-‐6-‐193
$20,000 $20,000 6 Small Communities/Small Projects (COMM)
$23,200 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 554 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
York Carroll Township Chestnut Park BRC-‐PRD-‐14-‐122
$147,500 $145,000 14 Park Rehabilitation and Development (COMM)
$295,000 COMM_Key
York Carroll Township Kelley Farm Acquisition
BRC-‐ACQ-‐11-‐172
$115,800 $98,000 11 Acquisition (COMM)
$231,600 COMM_Key
York Carroll Township N. York Rec., Park & Open Space Plan
BRC-‐TAG-‐9-‐44
$32,500 $32,000 9 Comp. Rec., Park, & Open Space Plans (COMM)
$65,000 COMM_Key
York Codorus Township Bailey Property Acquisition
BRC-‐ACQ-‐10-‐177
$121,800 $100,000 10 Acquisition (COMM)
$243,600 COMM_Key
York Codorus Township Codorus Township Municipal Park- Phase 2- Development
BRC-PRD-19-72
$92,500.00 $92,500.00 19 Park Rehabilitation and Development (COMM)
$185,000.00 COMM_Key
York Codorus Township Codorus Township Municipal Park- Phase 2- Development
BRC-PRD-19-72
$92,500.00 $92,500.00 19 Park Rehabilitation and Development (COMM)
$185,000.00 COMM_Key
York Codorus Township Codorus Township Municipal Park- Phase 2- Development
BRC-PRD-19-72
$92,500.00 $92,500.00 19 Park Rehabilitation and Development (COMM)
$185,000.00 COMM_Key
York Dillsburg Borough Dillsburg Community Park -‐ Phase 1 -‐ Development
BRC-‐PRD-‐18-‐62
$123,000 $123,000 18 Park Rehabilitation and Development (COMM)
$246,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 555 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
York Dillsburg Borough HCC Land Acquisition BRC-‐ACQ-‐17-‐90
$250,000 $234,800 17 Acquisition (COMM)
$500,000 COMM_Key
York Dover Borough Ketterman Park BRC-‐PRD-‐9-‐63
$80,000 $115,000 9 Park Rehabilitation and Development (COMM)
$230,000 COMM_Key
York Dover Borough Ketterman Park -‐ Phase II
BRC-‐SC-‐14-‐80
$40,000 $40,000 14 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
York Dover Township Lehr Unity Park BRC-‐PRD-‐7-‐51
$105,357 $105,000 7 Park Rehabilitation and Development (COMM)
$210,715 COMM_Key
York East Manchester Township
Dauberton Park BRC-‐PRD-‐9-‐68
$84,700 $84,000 9 Park Rehabilitation and Development (COMM)
$169,400 COMM_Key
York East Manchester Township
Dauberton Recreation Area Master Plan
KEY-‐TAG-‐4-‐49
$11,250 $11,200 4 Master Site Plans (COMM)
$22,500 COMM_Key
York East Prospect Borough
Borough Playground BRC-‐SC-‐7-‐61
$20,000 $20,000 7 Small Communities/Small Projects (COMM)
$27,900 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 556 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
York East Prospect Borough
East Prospect Park -‐ Development
BRC-‐SC-‐17-‐32
$40,000 $40,000 17 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
York Fairview Township Woodbridge Park BRC-‐PRD-‐6-‐62
$30,700 $24,000 6 Park Rehabilitation and Development (COMM)
$169,700 COMM_Key
York Farm & Natural Lands Trust of York County
Codorus Creek Watershed Preservation Plan
BRC-‐RCI-‐11.5-‐1
$26,000 $25,000 11.5 Implementation (RIV)
$51,000 RIVER_Key
York Farm & Natural Lands Trust of York County
Susquehanna Heritage Park
BRC-‐LTA-‐13.6-‐610
$1,400,000 $1,400,000 13.6 Open Space Acquisition (LT)
$2,900,000 LT_Key
York Farm & Natural Lands Trust of York County
Susquehanna Riverlands
BRC-‐LTA-‐10-‐7
$1,000,000 $2,000,000 10 Open Space Acquisition (LT)
$13,411,400 LT_Key
York Farm & Natural Lands Trust of York County
Swann Property BRC-‐LTA-‐7-‐6
$110,125 $100,000 7 Open Space Acquisition (LT)
$305,250 LT_Key
York Franklin Township Ponderosa Park Playground
BRC-‐SC-‐11-‐125
$40,000 $40,000 11 Small Communities/Small Projects (COMM)
$62,600 COMM_Key
York Franklintown Borough
Borough Park KEY-‐ACQ-‐3-‐71
$18,100 $13,000 3 Acquisition (COMM)
$36,200 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 557 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
York Franklintown Borough
Franklintown Borough Park
BRC-‐SC-‐6-‐71
$20,000 $20,000 6 Small Communities/Small Projects (COMM)
$39,600 COMM_Key
York Franklintown Borough
Municipal Park Expansion
BRC-‐ACQ-‐9-‐81
$64,800 $62,000 9 Acquisition (COMM)
$188,800 COMM_Key
York Goldsboro Borough Goldsboro Borough Park Improvements
BRC-‐SC-‐10-‐80
$25,000 $25,000 10 Small Communities/Small Projects (COMM)
$30,000 COMM_Key
York Hallam Borough Emig Memorial Park BRC-‐PRD-‐11-‐40
$108,200 $100,000 11 Park Rehabilitation and Development (COMM)
$216,400 COMM_Key
York Heidelberg Township
Township Park -‐ Phase II
BRC-‐SC-‐8-‐233
$40,000 $40,000 8 Small Communities/Small Projects (COMM)
$90,000 COMM_Key
York Hellam Township Comprehensive Rec., Park and Open Space Plan
BRC-‐TAG-‐17-‐9
$29,738 $29,700 17 Comp. Rec., Park, & Open Space Plans (COMM)
$59,475 COMM_Key
York Hopewell Township Stewartstown Fairgrounds Park
BRC-‐PRD-‐9-‐96
$150,000 $140,000 9 Park Rehabilitation and Development (COMM)
$300,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 558 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
York Jackson Township Township Park-‐ Phase 1-‐ Development (aka Stone Ledge Park)
BRC-‐PRD-‐16-‐139
$160,000 $160,000 16 Park Rehabilitation and Development (COMM)
$320,000 COMM_Key
York Jacobus Borough Recreation Area KEY-‐SC-‐1-‐62 $20,000 $20,000 1 Small Communities/Small Projects (COMM)
$33,058 COMM_Key
York Jacobus Borough Recreation Area KEY-‐SC-‐4-‐71 $20,000 $20,000 4 Small Communities/Small Projects (COMM)
$25,000 COMM_Key
York Jacobus Borough Smith Tract Acquisition
BRC-‐ACQ-‐10-‐186
$56,900 $49,000 10 Acquisition (COMM)
$113,800 COMM_Key
York Jefferson Borough Borough Park BRC-‐SC-‐8-‐93
$40,000 $40,000 8 Small Communities/Small Projects (COMM)
$63,800 COMM_Key
York Logan Park Authority Logan Park BRC-‐PRD-‐13-‐385
$32,000 $32,000 13 Park Rehabilitation and Development (COMM)
$64,000 COMM_Key
York Lower Windsor Township
Circuit Rider BRC-‐TAG-‐9-‐5
$96,076 $85,576 9 Circuit Rider (COMM)
$114,040 COMM_Key
York Lower Windsor Township
Peer-‐To-‐Peer Project BRC-‐TAG-‐7-‐109
$7,500 $7,500 7 Peer-‐to-‐Peer Tech. Assistance (COMM)
$8,250 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 559 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
York Lower Windsor Township
Rexroth Memorial Park -‐ Phase II
BRC-‐PRD-‐9-‐123
$54,400 $54,000 9 Park Rehabilitation and Development (COMM)
$109,000 COMM_Key
York Lower Windsor Township
Rexroth Park BRC-‐PRD-‐7-‐110
$20,000 $20,000 7 Park Rehabilitation and Development (COMM)
$40,000 COMM_Key
York Manchester Borough
Village Green Park BRC-‐SC-‐6-‐104
$20,000 $20,000 6 Small Communities/Small Projects (COMM)
$31,925 COMM_Key
York Manchester Township
Cousler Park -‐ Phase I
BRC-‐PRD-‐10-‐25
$115,000 $100,000 10 Park Rehabilitation and Development (COMM)
$230,000 COMM_Key
York Manchester Township
Cousler Park Expansion
BRC-‐ACQ-‐9-‐126
$120,000 $110,000 9 Acquisition (COMM)
$240,000 COMM_Key
York Manheim Township Community Park Acquisition
BRC-‐ACQ-‐8-‐113
$59,300 $59,000 8 Acquisition (COMM)
$118,500 COMM_Key
York Manheim Township Manheim Adventure Park -‐ Phase I
BRC-‐PRD-‐14-‐152
$199,800 $200,000 14 Park Rehabilitation and Development (COMM)
$468,100 COMM_Key
York New Freedom Borough
Circuit Rider KEY-‐TAG-‐1-‐93
$25,000 $25,000 1 Circuit Rider (COMM)
$25,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 560 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
York New Freedom Borough
Circuit Rider (Year 2) KEY-‐TAG-‐2-‐110
$19,840 $19,800 2 Circuit Rider (COMM)
$26,452 COMM_Key
York Newberry Township Shelley and York Haven Parks
BRC-‐PRD-‐14-‐158
$260,300 $150,000 14 Park Rehabilitation and Development (COMM)
$520,600 COMM_Key
York Newberry Township Shelley Park Development Project Phase I
BRC-‐PRD-‐10-‐129
$43,435 $43,000 10 Park Rehabilitation and Development (COMM)
$86,870 COMM_Key
York Newberry Township White Oak Park KEY-‐PRD-‐1-‐94
$48,925 $48,900 1 Park Rehabilitation and Development (COMM)
$97,850 COMM_Key
York North Codorus Township
Community Park KEY-‐PRD-‐3-‐154
$45,700 $45,000 3 Park Rehabilitation and Development (COMM)
$91,400 COMM_Key
York North York Borough 5th Avenue Park BRC-‐SC-‐7-‐142
$20,000 $20,000 7 Small Communities/Small Projects (COMM)
$20,000 COMM_Key
York Paradise Township Recreation Park BRC-‐ACQ-‐8-‐144
$46,800 $41,000 8 Acquisition (COMM)
$93,700 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 561 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
York Paradise Township Recreation Park (Farmer's Field) -‐ Phase II
BRC-‐SC-‐11-‐144
$40,000 $40,000 11 Small Communities/Small Projects (COMM)
$60,000 COMM_Key
York Railroad Borough Borough Park Renovation
BRC-‐SC-‐12-‐116
$40,000 $40,000 12 Small Communities/Small Projects (COMM)
$75,300 COMM_Key
York Red Lion Borough Fairmount Park -‐ Phase 1 -‐ Development
BRC-‐PRD-‐17-‐149
$200,000 $302,900 17 Park Rehabilitation and Development (COMM)
$400,000 COMM_Key
York Shrewsbury Township
Southern York Recreation Complex-‐Phase I
BRC-‐PRD-‐8-‐174
$150,000 $130,000 8 Park Rehabilitation and Development (COMM)
$456,900 COMM_Key
York Shrewsbury Township
Southern York Regional Park
BRC-‐ACQ-‐7-‐175
$90,101 $90,000 7 Acquisition (COMM)
$186,202 COMM_Key
York Shrewsbury Township Winchester & Windy Hill Parks- Development
BRC-PRD-19-114
$120,000.00 $120,000.00 19 Park Rehabilitation and Development (COMM)
$240,000.00 COMM_Key
York Shrewsbury Township Winchester & Windy Hill Parks- Development
BRC-PRD-19-114
$120,000.00 $120,000.00 19 Park Rehabilitation and Development (COMM)
$240,000.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 562 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
York Shrewsbury Township Winchester & Windy Hill Parks- Development
BRC-PRD-19-114
$120,000.00 $120,000.00 19 Park Rehabilitation and Development (COMM)
$240,000.00 COMM_Key
York Shrewsbury Township
Windy Hill Park KEY-‐PRD-‐3-‐195
$54,700 $54,700 3 Park Rehabilitation and Development (COMM)
$109,400 COMM_Key
York Southern Regional Recreation Board
Circuit Rider -‐ Year 3 KEY-‐TAG-‐3-‐202
$13,800 $13,800 3 Circuit Rider (COMM)
$27,600 COMM_Key
York Spring Grove Borough
Circuit Rider BRC-‐TAG-‐10-‐17
$108,142 $108,142 10 Circuit Rider (COMM)
$130,090 COMM_Key
York Spring Grove Borough
Community Center BRC-‐PRD-‐6-‐172
$100,275 $100,000 6 Park Rehabilitation and Development (COMM)
$200,550 COMM_Key
York Spring Grove Borough
Community Park BRC-‐PRD-‐13-‐254
$70,300 $70,000 13 Park Rehabilitation and Development (COMM)
$140,600 COMM_Key
York Spring Grove Borough
Community Park -‐ Phase 2 -‐ Development
BRC-‐PRD-‐18-‐101
$135,000 $135,000 18 Park Rehabilitation and Development (COMM)
$270,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 563 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
York Spring Grove Borough
Spring Grove Area Community Center
BRC-‐PRD-‐11-‐84
$39,400 $39,000 11 Park Rehabilitation and Development (COMM)
$78,800 COMM_Key
York Springettsbury Township
Comprehensive Recreation, Park and Greenway Plan
BRC-‐TAG-‐11.5-‐33
$30,000 $30,000 11.5 Comp. Rec., Park, & Open Space Plans (COMM)
$60,000 COMM_Key
York Springettsbury Township
Penn Oaks Park -‐ Phase 1 Development
BRC-‐PRD-‐12-‐203
$150,000 $150,000 12 Park Rehabilitation and Development (COMM)
$300,000 COMM_Key
York Springettsbury Township
Pleasureville Park, North Hills Parcel & Augus Schaefer Park
BRC-‐TAG-‐13-‐208
$46,000 $30,000 13 Master Site Plans (COMM)
$92,700 COMM_Key
York Springfield Township Hollow Creek Greenway
BRC-‐PRD-‐12-‐287
$55,000 $55,000 12 Park Rehabilitation and Development (COMM)
$630,000 COMM_Key
York Springfield Township Hollow Creek Greenway
BRC-‐PRD-‐12-‐287
$55,000 $100,000 12 Park Rehabilitation and Development (COMM)
$630,000 COMM_Key
York Springfield Township Lehman Park Master Site Plan
BRC-‐TAG-‐14-‐244
$14,000 $14,000 14 Master Site Plans (COMM)
$28,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 564 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
York The Conservation Fund
Glatfelter Parcel Acquisition
BRC-‐LTA-‐17-‐226
$425,000 $360,000 17 Critical Habitat Acquisition (LT)
$825,000 LT_Key
York The Conservation Fund
Pasch Land Acquisition (Camp Security)
BRC-‐LTA-‐17-‐214
$500,000 $485,000 17 Open Space Acquisition (LT)
$1,000,000 LT_Key
York The Conservation Fund
Walters Acquisition (Camp Security)
BRC-‐LTA-‐16-‐237
$750,000 $1,060,000 16 Open Space Acquisition (LT)
$2,600,000 LT_Key
York Trout Unlimited Codorus Chapter #558
Codorus Creek Watershed Plan
KEY-‐RCP-‐5-‐8
$25,000 $25,000 5 Planning (RIV) $50,000 RIVER_Key
York Trout Unlimited Muddy Creek Chapter #575
Muddy Creek Watershed River Conservation Plan
BRC-‐RCP-‐11-‐10
$72,100 $50,000 11 Planning (RIV) $144,200 RIVER_Key
York Warrington Township
Don-‐El Property BRC-‐ACQ-‐6-‐190
$40,950 $37,000 6 Acquisition (COMM)
$81,900 COMM_Key
York Warrington Township
Warrington Township Park Development
BRC-‐PRD-‐12-‐215
$60,000 $60,000 12 Park Rehabilitation and Development (COMM)
$140,000 COMM_Key
York Wellsville Borough Borough Park KEY-‐ACQ-‐5-‐219
$35,000 $35,000 5 Acquisition (COMM)
$70,000 COMM_Key
York West Manheim Township
Recreation Park BRC-‐ACQ-‐6-‐197
$225,000 $200,000 6 Acquisition (COMM)
$450,000 COMM_Key
York West Manheim Township
Recreation Park Master Plan
BRC-‐TAG-‐9-‐229
$25,000 $25,000 9 Master Site Plans (COMM)
$50,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 565 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
York West Manheim Township
West Manheim Township Recreation Park- Development
BRC-PRD-19-125
$81,808.00 $82,000.00 19 Park Rehabilitation and Development (COMM)
$163,616.00 COMM_Key
York West Manheim Township
West Manheim Township Recreation Park- Development
BRC-PRD-19-125
$81,808.00 $82,000.00 19 Park Rehabilitation and Development (COMM)
$163,616.00 COMM_Key
York West Manheim Township
West Manheim Township Recreation Park- Development
BRC-PRD-19-125
$81,808.00 $82,000.00 19 Park Rehabilitation and Development (COMM)
$163,616.00 COMM_Key
York West York Borough Slagle Park Renovations Project
BRC-‐SC-‐11-‐165
$40,000 $40,000 11 Small Communities/Small Projects (COMM)
$75,200 COMM_Key
York Windsor Borough Borough Park KEY-‐SC-‐2-‐180
$20,000 $20,000 2 Small Communities/Small Projects (COMM)
$22,400 COMM_Key
York Windsor Borough Windsor Borough Park
BRC-‐SC-‐10-‐104
$22,650 $22,000 10 Small Communities/Small Projects (COMM)
$25,300 COMM_Key
York Windsor Township Circuit Rider BRC-‐TAG-‐10-‐1
$80,185 $72,217 10 Circuit Rider (COMM)
$134,444 COMM_Key
York Windsor Township Community Center Feasibility Study
BRC-‐TAG-‐11-‐241
$35,800 $35,800 11 Feasibility Studies (COMM)
$71,600 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 566 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
York Wrightsville Borough Rec. Open Space & Greenway Plan & Park Feasibility Study
BRC-‐TAG-‐15-‐105
$26,732 $26,732 15 Comp. Rec., Park, & Open Space Plans (COMM)
$80,195 COMM_Key
York Yoe Borough Borough Park Renovation
BRC-‐PRD-‐12-‐218
$117,000 $70,000 12 Park Rehabilitation and Development (COMM)
$235,200 COMM_Key
York Yoe Borough Recreation Park KEY-‐SC-‐5-‐230
$12,900 $12,900 5 Small Communities/Small Projects (COMM)
$16,573 COMM_Key
York York City Campus Park KEY-‐PRD-‐1-‐151
$33,813 $33,800 1 Park Rehabilitation and Development (COMM)
$67,626 COMM_Key
York York City Comp. Recreation, Park & Open Space Plan
KEY-‐TAG-‐4-‐178
$12,000 $12,000 4 Comp. Rec., Park, & Open Space Plans (COMM)
$32,000 COMM_Key
York York City Farquhar Park KEY-‐PRD-‐4-‐179
$62,271 $62,300 4 Park Rehabilitation and Development (COMM)
$124,542 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 567 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
York York City Memorial and Penn Parks -‐ Development
BRC-‐PRD-‐16-‐168
$200,000 $200,000 16 Park Rehabilitation and Development (COMM)
$400,000 COMM_Key
York York City Memorial Park Rehabilitation
BRC-‐PRD-‐11-‐103
$100,000 $100,000 11 Park Rehabilitation and Development (COMM)
$200,000 COMM_Key
York York City Odeon Park BRC-‐PRD-‐13-‐454
$250,000 $200,000 13 Park Rehabilitation and Development (COMM)
$500,000 COMM_Key
York York City Penn Park BRC-‐PRD-‐6-‐205
$42,881 $43,000 6 Park Rehabilitation and Development (COMM)
$85,761 COMM_Key
York York City Penn Park KEY-‐PRD-‐3-‐245
$80,700 $80,700 3 Park Rehabilitation and Development (COMM)
$161,400 COMM_Key
York York County Heritage Rail Trail County Park
BRC-‐RTD-‐6-‐23
$200,000 $90,000 6 Rail Rehabilitation and Development (RT)
$1,000,000 RT_Key
Keystone Fund Projects by County (1994-‐2013)
Page 568 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
York York County Natural Areas Inventory
KEY-‐TAG-‐1-‐152
$30,320 $25,000 1 Natural Areas Inventories (COMM)
$60,640 COMM_Key
York York County Nixon County Park Expansion
BRC-‐ACQ-‐7-‐215
$45,000 $45,000 7 Acquisition (COMM)
$90,000 COMM_Key
York York County Richard M. Nixon Park Master Site Plan
BRC-‐TAG-‐18-‐154
$23,000 $23,000 18 Master Site Plans (COMM)
$46,000 COMM_Key
York York County Rocky Ridge County Park
BRC-‐PRD-‐10-‐144
$145,000 $45,000 10 Park Rehabilitation and Development (COMM)
$290,000 RT_Key
York York County Rocky Ridge County Park
BRC-‐PRD-‐10-‐144
$145,000 $100,000 10 Park Rehabilitation and Development (COMM)
$290,000 COMM_Key
York York County Rocky Ridge Master Plan/County Greenway Plan
BRC-‐TAG-‐6-‐206
$20,000 $30,000 6 Master Site Plans (COMM)
$60,000 COMM_Key
York York County Rudy Park KEY-‐PRD-‐5-‐231
$150,000 $150,000 5 Park Rehabilitation and Development (COMM)
$307,500 COMM_Key
York York County Susquehanna Heritage Park Plan
BRC-‐TAG-‐16-‐238
$50,000 $50,000 16 Master Site Plans (COMM)
$100,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 569 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
York York County York County Heritage Rail-‐Trail
KEY-‐RTD-‐3-‐27
$150,000 $100,000 3 Rail Rehabilitation and Development (RT)
$200,000 RT_Key
York York County York County Trail Plan
BRC-‐TAG-‐13-‐213
$40,000 $40,000 13 Trail Study (COMM)
$80,000 COMM_Key
York York County Conservation District
Codorus Creek Watershed Conservation Plan
BRC-‐RCP-‐8-‐17
$25,000 $36,000 8 Planning (RIV) $50,000 RIVER_Key
York York County Conservation District
Kreutz Creek Watershed Plan
BRC-‐RCP-‐12-‐18
$65,000 $40,000 12 Planning (RIV) $130,000 RIVER_Key
York York County Conservation District
TreeVitalize Metros BRC-‐TV-‐15-‐31
$100,000 $100,000 15 Park Rehabilitation and Development (COMM)
$200,000 COMM_Key
York York County Rail Trail Authority
CSX Property Acquisition -‐ (Northern Extension of HRTCP)
BRC-‐ACQ-‐13.3-‐287
$30,900 $70,000 13.3 Acquisition (COMM)
$156,600 COMM_Key
York York County Rail Trail Authority
Hanover Trolley Trail Feasibility Study Phase 2
BRC-‐RTP-‐12-‐15
$20,000 $20,000 12 Feasibility Studies (RT)
$40,000 RT_Key
York York County Rail Trail Authority
Hanover Trolley Trail Jackson Township Phase 2
BRC-‐PRD-‐16-‐169
$127,500 $127,500 16 Park Rehabilitation and Development (COMM)
$255,000 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 570 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
York York County Rail Trail Authority
North Extension Heritage Rail Trail -‐ Phase 2 Development
BRC-‐PRD-‐16-‐219
$316,600 $295,600 16 Park Rehabilitation and Development (COMM)
$1,634,500 COMM_Key
York York County Rail Trail Authority
Northern Ext of Heritage Rail Trail County Park
BRC-‐PRD-‐11-‐104
$115,000 $115,000 11 Park Rehabilitation and Development (COMM)
$230,000 COMM_Key
York York County Rail Trail Authority
Northern Ext. of HRTCP Phase 2 Acquisitions
BRC-‐RTA-‐15-‐107
$25,000 $25,000 15 Acquisition (RT) $50,000 COMM_Key
York York County Rail Trail Authority
Northern Extension of HRTCP -‐ Phase 1A
BRC-‐PRD-‐13.3-‐456
$100,100 $100,000 13.3 Park Rehabilitation and Development (COMM)
$200,200 COMM_Key
York York County Rail Trail Authority
York County Heritage Rail Trail
KEY-‐RTD-‐4-‐22
$160,300 $100,000 4 Rail Rehabilitation and Development (RT)
$320,600 RT_Key
York York County Rail Trail Authority
York County Heritage Rail Trail – Northern Ext Phase 3 – Development
BRC-RTD-19-154
$157,500.00 $157,500.00 19 Rail Rehabilitation and Development (RT)
$315,000.00 COMM_Key
Keystone Fund Projects by County (1994-‐2013)
Page 571 of 571
County Applicant Name Project TitleContract Number
Amount Requested
Amount Awarded
GrantRound Funding Type
Total Project Cost
Funding Source
York York County Rail Trail Authority
York County Heritage Rail Trail – Northern Ext Phase 3 – Development
BRC-RTD-19-154
$157,500.00 $157,500.00 19 Rail Rehabilitation and Development (RT)
$315,000.00 COMM_Key
York York County Rail Trail Authority
York County Heritage Rail Trail – Northern Ext Phase 3 – Development
BRC-RTD-19-154
$157,500.00 $157,500.00 19 Rail Rehabilitation and Development (RT)
$315,000.00 COMM_Key
York York Township Comp. Recreation, Park Open Space & Greenway Plan
BRC-‐TAG-‐6-‐207
$20,000 $20,000 6 Comp. Rec., Park, & Open Space Plans (COMM)
$40,000 COMM_Key
York York Township MA & PA Community Greenway Feasibility Study
BRC-‐TAG-‐13.3-‐500
$42,300 $40,000 13.3 Feasibility Studies (COMM)
$84,600 COMM_Key
York York Township Stump Park BRC-‐PRD-‐12-‐220
$236,600 $200,000 12 Park Rehabilitation and Development (COMM)
$473,300 COMM_Key
York York Township Township Park-‐Phase III
KEY-‐PRD-‐2-‐182
$46,500 $46,500 2 Park Rehabilitation and Development (COMM)
$93,000 COMM_Key