Keystone Fund Projects by County (19942013) Page 1 of 571 County Applicant Name Project Title Contract Number Amount Requested Amount Awarded GrantR ound Funding Type Total Project Cost Funding Source Adams Adams County North Gettysburg Area Trail Feasibility KEYTAG3 4 $20,000 $20,000 3 Feasibility Studies (COMM) $40,000 COMM_Key Adams Adams County North Gettysburg TrailPhase I (Part 1) BRCPRD8 13 $125,000 $69,300 8 Park Rehabilitation and Development (COMM) $625,000 COMM_Key Adams Adams County Southwest Adams County Joint Comprehensive Plan BRCTAG 13.6586 $15,000 $15,000 13.6 Greenway Plans (COMM) $30,000 COMM_Key Adams Adams County W. Adams County SubReg. Park Feas. Study BRCTAG8 14 $20,000 $20,000 8 Feasibility Studies (COMM) $40,000 COMM_Key Adams East Berlin Borough Community Park BRCPRD13 101 $192,400 $100,000 13 Park Rehabilitation and Development (COMM) $384,900 COMM_Key Adams East Berlin Borough East Berlin Park KEYSC352 $12,000 $12,000 3 Small Communities/S mall Projects (COMM) $12,000 COMM_Key Adams Gettysburg Borough Biser Fitness Trail and Walking Path BRCPRD11 38 $28,500 $28,500 11 Park Rehabilitation and Development (COMM) $57,100 COMM_Key Adams Gettysburg Borough Community Pool Feasibility Study BRCTAG 12.525 $12,500 $12,500 12.5 Feasibility Studies (COMM) $25,000 COMM_Key

Upload: others

Post on 18-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  1  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Adams Adams  County North  Gettysburg  Area  Trail  Feasibility

KEY-­‐TAG-­‐3-­‐4

$20,000 $20,000 3 Feasibility  Studies  (COMM)

$40,000 COMM_Key

Adams Adams  County North  Gettysburg  Trail-­‐Phase  I  (Part  1)

BRC-­‐PRD-­‐8-­‐13

$125,000 $69,300 8 Park  Rehabilitation  and  Development  (COMM)

$625,000 COMM_Key

Adams Adams  County Southwest  Adams  County  Joint  Comprehensive  Plan

BRC-­‐TAG-­‐13.6-­‐586

$15,000 $15,000 13.6 Greenway  Plans  (COMM)

$30,000 COMM_Key

Adams Adams  County W.  Adams  County  Sub-­‐Reg.  Park  Feas.  Study

BRC-­‐TAG-­‐8-­‐14

$20,000 $20,000 8 Feasibility  Studies  (COMM)

$40,000 COMM_Key

Adams East  Berlin  Borough Community  Park BRC-­‐PRD-­‐13-­‐101

$192,400 $100,000 13 Park  Rehabilitation  and  Development  (COMM)

$384,900 COMM_Key

Adams East  Berlin  Borough East  Berlin  Park KEY-­‐SC-­‐3-­‐52 $12,000 $12,000 3 Small  Communities/Small  Projects  (COMM)

$12,000 COMM_Key

Adams Gettysburg  Borough Biser  Fitness  Trail  and  Walking  Path

BRC-­‐PRD-­‐11-­‐38

$28,500 $28,500 11 Park  Rehabilitation  and  Development  (COMM)

$57,100 COMM_Key

Adams Gettysburg  Borough Community  Pool  Feasibility  Study

BRC-­‐TAG-­‐12.5-­‐25

$12,500 $12,500 12.5 Feasibility  Studies  (COMM)

$25,000 COMM_Key

Page 2: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  2  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Adams Gettysburg  Borough Gettysburg  Area  Rec.  Park  Master  Site  Plan

BRC-­‐TAG-­‐16-­‐59

$20,000 $20,000 16 Master  Site  Plans  (COMM)

$40,000 COMM_Key

Adams Gettysburg  Borough Gettysburg  Regional  Alternative  Skate  Park

BRC-­‐PRD-­‐9-­‐84

$43,600 $43,000 9 Park  Rehabilitation  and  Development  (COMM)

$87,200 COMM_Key

Adams Hamilton  Township G.R.E.A.T.R.  Greenway  Routes  for  Eastern  Adams  Transportation

BRC-­‐RTP-­‐18-­‐172

$12,500 $12,500 18 Feasibility  Studies  (RT)

$25,000 COMM_Key

Adams Hamiltonban  Township

Peer-­‐to-­‐Peer  Project  Study  Multi-­‐Municipal  Recreation  and  Park  Opportunities  -­‐  Southwest  Adams  County  Recreational  Study

BRC-­‐TAG-­‐17-­‐231

$10,000 $10,000 17 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$11,000 COMM_Key

Adams Land  Conservancy  of  Adams  County,  Inc.  

Penn  Forestry  Conservation  Easement

BRC-­‐LTA-­‐12-­‐17

$274,000 $274,000 12 Open  Space  Acquisition  (LT)

$548,000 LT_Key

Adams Latimore  Township Latimore  Park  -­‐  Phase  1  Development

BRC-­‐SC-­‐12-­‐103

$40,000 $40,000 12 Small  Communities/Small  Projects  (COMM)

$63,600 COMM_Key

Page 3: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  3  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Adams Latimore  Township Township  Park KEY-­‐SC-­‐5-­‐108

$20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$25,506 COMM_Key

Adams McSherrystown  Borough

West  Recreation  Park

KEY-­‐SC-­‐3-­‐131

$19,000 $19,000 3 Small  Communities/Small  Projects  (COMM)

$30,200 COMM_Key

Adams Mount  Joy  Township Comp  Rec,  Pk  and  Open  Space  Plan

BRC-­‐TAG-­‐13-­‐197

$30,000 $30,000 13 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$60,000 COMM_Key

Adams Oxford  Township Feeser  Land  Acquisition

BRC-­‐ACQ-­‐12.5-­‐19

$114,400 $114,000 12.5 Acquisition  (COMM)

$228,800 COMM_Key

Adams Oxford  Township Oxford  Township  Recreation  Park  Master  Site  Plan

BRC-­‐TAG-­‐13.3-­‐483

$17,500 $17,500 13.3 Master  Site  Plans  (COMM)

$35,100 COMM_Key

Adams Strawberry  Hill  Foundation,  Inc.  

Gross  Minerals  Property

BRC-­‐LTA-­‐6-­‐20

$152,500 $127,150 6 Open  Space  Acquisition  (LT)

$305,000 LT_Key

Adams, Cumberland, Franklin, York

Appalachian Trail Conservancy

South Mountain Partnership Implementation 2014

BRC-SR-19-165

$196,760.00 $20,000.00 19 Partnerships Projects

$280,462.00 LT_Key

Adams, Cumberland, Franklin, York

Appalachian Trail Conservancy

South Mountain Partnership Implementation 2014

BRC-SR-19-165

$196,760.00 $20,000.00 19 Partnerships Projects

$280,462.00 LT_Key

Adams, Cumberland, Franklin, York

Appalachian Trail Conservancy

South Mountain Partnership Implementation 2014

BRC-SR-19-165

$196,760.00 $20,000.00 19 Partnerships Projects

$280,462.00 LT_Key

Adams, Cumberland, Franklin, York

Appalachian Trail Conservancy

South Mountain Partnership Implementation 2014

BRC-SR-19-165

$196,760.00 $20,000.00 19 Partnerships Projects

$280,462.00 LT_Key

Page 4: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  4  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Adams, Cumberland, Franklin, York

Appalachian Trail Conservancy

South Mountain Partnership Implementation 2014

BRC-SR-19-165

$196,760.00 $20,000.00 19 Partnerships Projects

$280,462.00 LT_Key

Adams, Cumberland, Franklin, York

Appalachian Trail Conservancy

South Mountain Partnership Implementation 2014

BRC-SR-19-165

$196,760.00 $20,000.00 19 Partnerships Projects

$280,462.00 LT_Key

Adams, Cumberland, Franklin, York

Appalachian Trail Conservancy

South Mountain Partnership Implementation 2014

BRC-SR-19-165

$196,760.00 $20,000.00 19 Partnerships Projects

$280,462.00 LT_Key

Adams, Cumberland, Franklin, York

Appalachian Trail Conservancy

South Mountain Partnership Implementation 2014

BRC-SR-19-165

$196,760.00 $20,000.00 19 Partnerships Projects

$280,462.00 LT_Key

Adams, Cumberland, Franklin, York

Appalachian Trail Conservancy

South Mountain Partnership Implementation 2014

BRC-SR-19-165

$196,760.00 $20,000.00 19 Partnerships Projects

$280,462.00 LT_Key

Adams, Cumberland, Franklin, York

Appalachian Trail Conservancy

South Mountain Partnership Implementation 2014

BRC-SR-19-165

$196,760.00 $20,000.00 19 Partnerships Projects

$280,462.00 LT_Key

Adams, Cumberland, Franklin, York

Appalachian Trail Conservancy

South Mountain Partnership Implementation 2014

BRC-SR-19-165

$196,760.00 $20,000.00 19 Partnerships Projects

$280,462.00 LT_Key

Adams, Cumberland, Franklin, York

Appalachian Trail Conservancy

South Mountain Partnership Implementation 2014

BRC-SR-19-165

$196,760.00 $20,000.00 19 Partnerships Projects

$280,462.00 LT_Key

Adams, Cumberland, Franklin, York

Appalachian Trail Conservancy

South Mountain Partnership Implementation 2014

BRC-SR-19-165

$196,760.00 $20,000.00 19 Partnerships Projects

$280,462.00 LT_Key

Adams, Cumberland, Franklin, York

Appalachian Trail Conservancy

South Mountain Partnership Implementation 2014

BRC-SR-19-165

$196,760.00 $20,000.00 19 Partnerships Projects

$280,462.00 LT_Key

Adams,  Cumberland,  York

Pennsylvania  Environmental  Council,  Inc.  

Conewago  Creek  Watershed  Conservation  Plan

BRC-­‐RCP-­‐10-­‐7

$136,624 $136,000 10 Planning  (RIV) $273,248 RIVER_Key

Page 5: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  5  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Adams,  Perry Central  Pennsylvania  Conservancy  

Yeager  Property/Lowe  Estate  Property

BRC-­‐LTA-­‐9-­‐4

$244,000 $740,000 9 Critical  Habitat  Acquisition  (LT)

$1,480,000 LT_Key

Allegheny Allegheny  County Allegheny  County  Gateways

BRC-­‐PRD-­‐6-­‐9

$150,000 $150,000 6 Park  Rehabilitation  and  Development  (COMM)

$300,000 COMM_Key

Allegheny Allegheny  County Boyce  Park  Snow  Tubing  Facility

BRC-­‐PRD-­‐13.3-­‐225

$550,000 $200,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$1,651,100 COMM_Key

Allegheny Allegheny  County Co.  Comp.  Rec.  Plan  &  Parks  Playground  Improve.

KEY-­‐PRD-­‐5-­‐4

$500,000 $1,000,000 5 Park  Rehabilitation  and  Development  (COMM)

$2,550,000 COMM_Key

Allegheny Allegheny  County Montour  Trail  -­‐  Section  5

KEY-­‐PRD-­‐1-­‐2

$50,000 $50,000 1 Park  Rehabilitation  and  Development  (COMM)

$100,000 COMM_Key

Allegheny Allegheny  County South  Park  Amphitheater

BRC-­‐PRD-­‐8-­‐15

$487,000 $200,000 8 Park  Rehabilitation  and  Development  (COMM)

$974,000 COMM_Key

Allegheny Allegheny  County W.  Pa  Botanical  Garden  Master  Plan/Point  State  Par

KEY-­‐TAG-­‐5-­‐5

$100,000 $150,000 5 Master  Site  Plans  (COMM)

$208,500 COMM_Key

Page 6: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  6  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Allegheny Allegheny  County  Redevelopment  Authority  

Sports  and  Athletics  Complex-­‐  Development

BRC-­‐PRD-­‐18-­‐45

$1,400,000 $300,000 18 Park  Rehabilitation  and  Development  (COMM)

$2,800,000 COMM_Key

Allegheny Allegheny  Land  Trust  Audubon  Greenbelt BRC-­‐LTA-­‐9-­‐3

$1,951,000 $600,000 9 Critical  Habitat  Acquisition  (LT)

$3,902,000 LT_Key

Allegheny Allegheny  Land  Trust  Barking  Slopes  -­‐  GLS  Property

BRC-­‐LTA-­‐7-­‐2

$157,000 $100,000 7 Open  Space  Acquisition  (LT)

$314,000 LT_Key

Allegheny Allegheny  Land  Trust  Chartiers  Greenway  Acquisition  -­‐  (Phase  II)

BRC-­‐LTA-­‐13.3-­‐554

$41,500 $38,000 13.3 Open  Space  Acquisition  (LT)

$83,000 LT_Key

Allegheny Allegheny  Land  Trust  Emerald  Link  Greenway  Acquisition

BRC-­‐LTA-­‐11.5-­‐1

$200,000 $100,000 11.5 Open  Space  Acquisition  (LT)

$400,000 LT_Key

Allegheny Allegheny  Land  Trust  Emerald  Link  Phase  II  -­‐  Ferrie  Acquisition

BRC-­‐LTA-­‐15-­‐112

$100,000 $81,000 15 Open  Space  Acquisition  (LT)

$200,000 LT_Key

Allegheny Allegheny  Land  Trust   Fern  Hollow  Greenbelt  Acquisition

BRC-­‐LTA-­‐8-­‐1

$261,500 $260,000 8 Open  Space  Acquisition  (LT)

$523,000 LT_Key

Allegheny Allegheny  Land  Trust   Liberty  Valley  BDA  Acquisition

BRC-­‐LTA-­‐14-­‐27

$71,500 $39,000 14 Open  Space  Acquisition  (LT)

$182,820 LT_Key

Allegheny Allegheny  Land  Trust  Mid-­‐Chartiers  Valley  Greenway

BRC-­‐LTA-­‐7-­‐3

$230,000 $230,000 7 Open  Space  Acquisition  (LT)

$460,000 LT_Key

Page 7: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  7  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Allegheny Allegheny  Land  Trust  Montour  Run  Property

KEY-­‐LTA-­‐5-­‐5 $179,000 $165,000 5 Open  Space  Acquisition  (LT)

$358,000 LT_Key

Allegheny Allegheny  Land  Trust  Pittsburgh  Cut  Flower

BRC-­‐LTA-­‐18-­‐10

$772,300 $509,500 18 Open  Space  Acquisition  (LT)

$1,544,600 LT_Key

Allegheny Allegheny  Land  Trust   Sycamore  Island  Acquisition

BRC-­‐LTA-­‐13.6-­‐607

$136,000 $136,000 13.6 Open  Space  Acquisition  (LT)

$272,000 LT_Key

Allegheny Avonworth  Municipal  Authority  

Acord  Park  Pool  Renovation

KEY-­‐PRD-­‐3-­‐8

$95,000 $95,000 3 Park  Rehabilitation  and  Development  (COMM)

$190,000 COMM_Key

Allegheny Avonworth  Municipal  Authority  

Avonworth  Community  Park

KEY-­‐PRD-­‐5-­‐11

$55,974 $55,000 5 Park  Rehabilitation  and  Development  (COMM)

$111,947 COMM_Key

Allegheny Avonworth  Municipal  Authority  

Circuit  Rider  -­‐  Year  2 KEY-­‐TAG-­‐4-­‐12

$27,300 $27,300 4 Circuit  Rider  (COMM)

$36,400 COMM_Key

Allegheny Avonworth  Municipal  Authority  

Circuit  Rider-­‐  Year  1 KEY-­‐TAG-­‐3-­‐9

$35,000 $35,000 3 Circuit  Rider  (COMM)

$35,000 COMM_Key

Allegheny Avonworth  Municipal  Authority  

Peer-­‐To-­‐Peer  Project BRC-­‐TAG-­‐7-­‐1

$7,500 $7,500 7 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$8,250 COMM_Key

Allegheny Baldwin  Township Armstrong  Park  Playground

BRC-­‐SC-­‐9-­‐13

$40,000 $40,000 9 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Page 8: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  8  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Allegheny Bell  Acres  Borough Playground  Rehab BRC-­‐SC-­‐11-­‐107

$40,000 $40,000 11 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Allegheny Bellevue  Borough Andrew  Bayne  Park  -­‐  Phase  2  -­‐  Development

BRC-­‐PRD-­‐17-­‐104

$60,000 $60,000 17 Park  Rehabilitation  and  Development  (COMM)

$120,000 COMM_Key

Allegheny Bellevue  Borough Lincoln  Playground KEY-­‐PRD-­‐5-­‐15

$87,700 $85,000 5 Park  Rehabilitation  and  Development  (COMM)

$175,417 COMM_Key

Allegheny Ben  Avon  Borough Avon  Park KEY-­‐SC-­‐5-­‐16 $20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$27,550 COMM_Key

Allegheny Ben  Avon  Borough Avon  Park  -­‐  Phase  2  -­‐Development

BRC-­‐SC-­‐17-­‐28

$39,789 $39,800 17 Small  Communities/Small  Projects  (COMM)

$59,868 COMM_Key

Allegheny Bethel  Park  Municipality

Baptist  Road  Park KEY-­‐PRD-­‐4-­‐14

$200,000 $100,000 4 Park  Rehabilitation  and  Development  (COMM)

$400,000 COMM_Key

Allegheny Bethel  Park  Municipality

Comprehensive  Recreation  &  Park  Plan

KEY-­‐TAG-­‐1-­‐10

$17,500 $17,500 1 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$35,000 COMM_Key

Page 9: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  9  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Allegheny Bethel  Park  Municipality

Millennium  Park BRC-­‐PRD-­‐7-­‐19

$100,000 $100,000 7 Park  Rehabilitation  and  Development  (COMM)

$200,000 COMM_Key

Allegheny Braddock  Borough Library  Street  Park BRC-­‐PRD-­‐13.3-­‐339

$80,000 $80,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$180,000 COMM_Key

Allegheny Braddock  Hills  Borough

Site  Feasibility  Study KEY-­‐TAG-­‐1-­‐15

$5,000 $5,000 1 Feasibility  Studies  (COMM)

$10,000 COMM_Key

Allegheny Bradford  Woods  Borough

Bradford  Woods  Park-­‐Phase  I

KEY-­‐SC-­‐2-­‐16 $20,000 $20,000 2 Small  Communities/Small  Projects  (COMM)

$51,100 COMM_Key

Allegheny Brentwood  Borough Brentwood  Park KEY-­‐PRD-­‐2-­‐17

$11,000 $11,000 2 Park  Rehabilitation  and  Development  (COMM)

$22,000 COMM_Key

Allegheny Bridgeville  Borough Chartiers  Park KEY-­‐PRD-­‐4-­‐18

$30,000 $30,000 4 Park  Rehabilitation  and  Development  (COMM)

$60,100 COMM_Key

Page 10: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  10  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Allegheny Bridgeville  Borough McLaughlin  Run  Park KEY-­‐PRD-­‐5-­‐22

$32,500 $32,000 5 Park  Rehabilitation  and  Development  (COMM)

$65,000 COMM_Key

Allegheny Carnegie  Borough Carnegie  Park  Phase  1-­‐Development

BRC-­‐PRD-­‐16-­‐126

$145,975 $145,000 16 Park  Rehabilitation  and  Development  (COMM)

$291,950 COMM_Key

Allegheny Carnegie Borough Carnegie Park Phase-2-Development

BRC-PRD-19-66

$199,264.00 $199,000.00 19 Park Rehabilitation and Development (COMM)

$441,518.00 COMM_Key

Allegheny Carnegie Borough Carnegie Park Phase-2-Development

BRC-PRD-19-66

$199,264.00 $199,000.00 19 Park Rehabilitation and Development (COMM)

$441,518.00 COMM_Key

Allegheny Carnegie Borough Carnegie Park Phase-2-Development

BRC-PRD-19-66

$199,264.00 $199,000.00 19 Park Rehabilitation and Development (COMM)

$441,518.00 COMM_Key

Allegheny Carnegie  Borough Sam  Chioda  Park KEY-­‐PRD-­‐3-­‐32

$34,000 $34,000 3 Park  Rehabilitation  and  Development  (COMM)

$68,000 COMM_Key

Page 11: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  11  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Allegheny Castle  Shannon  Borough

Hamilton  Park BRC-­‐PRD-­‐6-­‐234

$65,000 $102,500 6 Park  Rehabilitation  and  Development  (COMM)

$205,000 COMM_Key

Allegheny Chalfant  Borough Chalfant  Memorial  Park

KEY-­‐SC-­‐3-­‐36 $20,000 $20,000 3 Small  Communities/Small  Projects  (COMM)

$22,700 COMM_Key

Allegheny Char-­‐West  Council  of  Governments  

Multi-­‐Municipal  Recreation,  Open  Space,  Greenway  and  Master  Site  Plans

BRC-­‐TAG-­‐15-­‐88

$60,000 $55,000 15 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$110,000 COMM_Key

Allegheny Char-­‐West  Council  of  Governments  

Three  Rivers  Parkway

KEY-­‐PRD-­‐4-­‐27

$150,000 $100,000 4 Park  Rehabilitation  and  Development  (COMM)

$349,978 COMM_Key

Allegheny Chartiers  Nature  Conservancy  

Robinson  Run BRC-­‐LTA-­‐7-­‐4

$275,000 $275,000 7 Open  Space  Acquisition  (LT)

$550,000 LT_Key

Allegheny Cheswick  Borough MacLean  Park-­‐  Development

BRC-­‐PRD-­‐18-­‐56

$40,000 $40,000 18 Park  Rehabilitation  and  Development  (COMM)

$80,000 COMM_Key

Page 12: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  12  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Allegheny Collier Township Collier Discovery Path BRC-PRD-19-204

$179,583.50 $80,000.00 19 Park Rehabilitation and Development (COMM)

$502,846.00 COMM_Key

Allegheny Collier Township Collier Discovery Path BRC-PRD-19-204

$179,583.50 $80,000.00 19 Park Rehabilitation and Development (COMM)

$502,846.00 COMM_Key

Allegheny Collier Township Collier Discovery Path BRC-PRD-19-204

$179,583.50 $80,000.00 19 Park Rehabilitation and Development (COMM)

$502,846.00 COMM_Key

Allegheny Collier Township Collier Discovery Path BRC-PRD-19-204

$179,583.50 $80,000.00 19 Park Rehabilitation and Development (COMM)

$502,846.00 COMM_Key

Allegheny Collier  Township Comprehensive  Recreation,  Parks  &  Open  Space  Plan

BRC-­‐TAG-­‐12-­‐232

$20,000 $20,000 12 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$40,000 COMM_Key

Allegheny Collier  Township Hilltop  Park-­‐  Development

BRC-­‐PRD-­‐18-­‐58

$149,679 $149,000 18 Park  Rehabilitation  and  Development  (COMM)

$299,358 COMM_Key

Allegheny Collier  Township Kelly  Park BRC-­‐TAG-­‐7-­‐40

$12,500 $12,500 7 Master  Site  Plans  (COMM)

$25,000 COMM_Key

Page 13: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  13  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Allegheny Collier  Township Robinson  Run  Bridge BRC-­‐PRD-­‐8-­‐47

$41,250 $41,000 8 Park  Rehabilitation  and  Development  (COMM)

$82,500 COMM_Key

Allegheny Collier  Township Skvarca  Park,  Webb  Field,  and  Nike  Park  -­‐  Development

BRC-­‐PRD-­‐17-­‐112

$105,000 $105,000 17 Park  Rehabilitation  and  Development  (COMM)

$210,400 COMM_Key

Allegheny Collier  Township Three  Sites KEY-­‐SC-­‐4-­‐35 $20,000 $20,000 4 Small  Communities/Small  Projects  (COMM)

$30,000 COMM_Key

Allegheny Coraopolis  Borough Ridge  Avenue  Tot  Lot

KEY-­‐PRD-­‐3-­‐41

$64,900 $40,000 3 Park  Rehabilitation  and  Development  (COMM)

$150,100 COMM_Key

Allegheny Crafton  Borough Crafton  Parks  Master  Site  Plan

BRC-­‐TAG-­‐16-­‐55

$35,000 $35,000 16 Master  Site  Plans  (COMM)

$70,000 COMM_Key

Allegheny Crafton  Borough Duncan  Property KEY-­‐ACQ-­‐5-­‐237

$82,000 $100,000 5 Acquisition  (COMM)

$164,000 COMM_Key

Allegheny Crescent  Township Huntsridge  Park BRC-­‐SC-­‐11-­‐115

$40,000 $40,000 11 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Page 14: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  14  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Allegheny Dormont  Borough Beggs  Snyder  Park KEY-­‐PRD-­‐2-­‐37

$64,000 $64,000 2 Park  Rehabilitation  and  Development  (COMM)

$159,203 COMM_Key

Allegheny Dormont  Borough Dormont  Pool  Improvement  Study

BRC-­‐TAG-­‐6-­‐53

$10,000 $10,000 6 Feasibility  Studies  (COMM)

$20,000 COMM_Key

Allegheny Dormont  Borough Master  Site  Development  Plan

KEY-­‐TAG-­‐3-­‐48

$16,400 $16,400 3 Master  Site  Plans  (COMM)

$32,900 COMM_Key

Allegheny Dormont  Borough Peer  to  Peer BRC-­‐TAG-­‐13-­‐36

$10,000 $10,000 13 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$11,000 COMM_Key

Allegheny Duquesne  City Polish  Hill  Ballfield BRC-­‐PRD-­‐11-­‐26

$15,000 $15,000 11 Park  Rehabilitation  and  Development  (COMM)

$30,000 COMM_Key

Allegheny East  McKeesport  Borough

Chicora  Street  Playground

KEY-­‐SC-­‐3-­‐54 $20,000 $20,000 3 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Allegheny Edgewood  Borough Comprehensive  Plan/Master  Site  Plan

BRC-­‐TAG-­‐6-­‐59

$20,000 $20,000 6 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$40,000 COMM_Key

Allegheny Edgewood  Borough Feasibility  Study KEY-­‐RTP-­‐3-­‐6 $15,000 $15,000 3 Feasibility  Studies  (RT)

$30,000 RT_Key

Page 15: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  15  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Allegheny Edgewood  Borough Koenig  Park-­‐  Development

BRC-­‐PRD-­‐18-­‐68

$54,000 $54,000 18 Park  Rehabilitation  and  Development  (COMM)

$116,500 COMM_Key

Allegheny Edgeworth  Borough Ohio  River  Boulevard  Feasibility  Study

BRC-­‐TAG-­‐14-­‐201

$10,000 $10,000 14 Feasibility  Studies  (COMM)

$20,000 COMM_Key

Allegheny Elizabeth  Township Buena  Vista  Park  Boat  Launch

BRC-­‐PRD-­‐7-­‐65

$20,928 $20,000 7 Park  Rehabilitation  and  Development  (COMM)

$41,856 COMM_Key

Allegheny Elizabeth  Township Chapel  Fellowship  and  Quail  Creek  Dev.  Acquisitions

BRC-­‐ACQ-­‐14-­‐55

$307,800 $307,000 14 Acquisition  (COMM)

$615,500 COMM_Key

Allegheny Elizabeth  Township Rec  Complex  Feasiiblity  Study-­‐Round  Hill  Park

BRC-­‐TAG-­‐11-­‐204

$15,100 $15,000 11 Feasibility  Studies  (COMM)

$30,200 COMM_Key

Allegheny Emsworth  Borough Marmo  Park BRC-­‐SC-­‐8-­‐63

$37,000 $37,000 8 Small  Communities/Small  Projects  (COMM)

$102,000 COMM_Key

Allegheny Etna  Borough Playground  Improvements

BRC-­‐PRD-­‐8-­‐67

$49,000 $49,000 8 Park  Rehabilitation  and  Development  (COMM)

$98,000 COMM_Key

Page 16: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  16  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Allegheny Findlay  Township Community  Park KEY-­‐SC-­‐5-­‐66 $16,400 $16,400 5 Small  Communities/Small  Projects  (COMM)

$24,497 COMM_Key

Allegheny Findlay  Township Recreation  and  Sports  Complex

BRC-­‐PRD-­‐10-­‐117

$150,000 $100,000 10 Park  Rehabilitation  and  Development  (COMM)

$300,000 COMM_Key

Allegheny Forest  Hills  Borough Forest  Hills  Park KEY-­‐PRD-­‐3-­‐66

$37,000 $37,000 3 Park  Rehabilitation  and  Development  (COMM)

$74,100 COMM_Key

Allegheny Forest  Hills  Borough Four  Sites KEY-­‐PRD-­‐2-­‐50

$25,000 $25,000 2 Park  Rehabilitation  and  Development  (COMM)

$50,400 COMM_Key

Allegheny Franklin  Park  Borough

3  Sites BRC-­‐PRD-­‐6-­‐70

$60,000 $60,000 6 Park  Rehabilitation  and  Development  (COMM)

$120,000 COMM_Key

Allegheny Franklin  Park  Borough

Blueberry  Hill  Park BRC-­‐PRD-­‐13-­‐360

$26,600 $26,600 13 Park  Rehabilitation  and  Development  (COMM)

$53,100 COMM_Key

Page 17: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  17  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Allegheny Franklin  Park  Borough

Blueberry  Hill  Park  Pavillion

BRC-­‐PRD-­‐11-­‐36

$77,900 $77,900 11 Park  Rehabilitation  and  Development  (COMM)

$155,800 COMM_Key

Allegheny Franklin  Park  Borough

Comp.  Plan  &  Master  Site  Plan

KEY-­‐TAG-­‐5-­‐69

$20,000 $20,000 5 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$40,000 COMM_Key

Allegheny Friends  of  the  Riverfront,  Inc.  

Millvale  River  Trail  Plan

KEY-­‐RTP-­‐5-­‐4 $35,000 $35,000 5 Feasibility  Studies  (RT)

$70,000 RT_Key

Allegheny Friends  of  the  Riverfront,  Inc.  

Three  Rivers  Heritage  Trail

KEY-­‐RTA-­‐95-­‐12

$69,000 $69,000 1 Acquisition  (RT) $370,000 RT_Key

Allegheny Friends  of  the  Riverfront,  Inc.  

Three  Rivers  Heritage  Trail

KEY-­‐RTD-­‐5-­‐5

$75,000 $86,300 5 Rail  Rehabilitation  and  Development  (RT)

$315,221 RT_Key

Allegheny Friends  of  the  Riverfront,  Inc.  

Three  Rivers  Heritage  Trail/Mon.  River  Section

KEY-­‐RTP-­‐4-­‐10

$50,000 $25,000 4 Master  Plans  (RT)

$100,000 RT_Key

Allegheny Glassport  Borough 3rd  &  9th  Streets  Playgrounds

BRC-­‐SC-­‐11-­‐126

$20,000 $20,000 11 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Allegheny Green  Tree  Borough Green  Tree  Park BRC-­‐PRD-­‐13-­‐368

$163,000 $102,000 13 Park  Rehabilitation  and  Development  (COMM)

$326,000 COMM_Key

Page 18: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  18  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Allegheny Green  Tree  Borough Hale  Park KEY-­‐SC-­‐3-­‐75 $10,000 $10,000 3 Small  Communities/Small  Projects  (COMM)

$24,000 COMM_Key

Allegheny Green  Tree  Borough Suella  Park BRC-­‐PRD-­‐6-­‐75

$47,500 $47,500 6 Park  Rehabilitation  and  Development  (COMM)

$95,000 COMM_Key

Allegheny Hampton  Township Community  Park KEY-­‐PRD-­‐2-­‐58

$60,000 $65,000 2 Park  Rehabilitation  and  Development  (COMM)

$130,000 COMM_Key

Allegheny Hampton  Township Community  Park  -­‐  Phase  II

KEY-­‐PRD-­‐3-­‐81

$68,300 $68,300 3 Park  Rehabilitation  and  Development  (COMM)

$136,600 COMM_Key

Allegheny Harmar  Township Terrace  Drive  Park BRC-­‐SC-­‐7-­‐82

$40,000 $30,000 7 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Allegheny Harrison  Township Natrona  Recreation  and  Art  Park

BRC-­‐PRD-­‐14-­‐145

$41,000 $41,000 14 Park  Rehabilitation  and  Development  (COMM)

$82,500 COMM_Key

Page 19: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  19  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Allegheny Heidelberg  Borough Borough  Park BRC-­‐PRD-­‐13-­‐107

$114,200 $100,000 13 Park  Rehabilitation  and  Development  (COMM)

$228,400 COMM_Key

Allegheny Heidelberg Borough Ellsworth Avenue Playground-Development

BRC-PRD-19-82

$65,120.00 $45,200.00 19 Park Rehabilitation and Development (COMM)

$130,240.00 COMM_Key

Allegheny Heidelberg Borough Ellsworth Avenue Playground-Development

BRC-PRD-19-82

$65,120.00 $45,200.00 19 Park Rehabilitation and Development (COMM)

$130,240.00 COMM_Key

Allegheny Heidelberg Borough Ellsworth Avenue Playground-Development

BRC-PRD-19-82

$65,120.00 $45,200.00 19 Park Rehabilitation and Development (COMM)

$130,240.00 COMM_Key

Allegheny Heidelberg  Borough Heidelberg  Park-­‐Development

BRC-­‐PRD-­‐16-­‐138

$46,560 $46,500 16 Park  Rehabilitation  and  Development  (COMM)

$93,120 COMM_Key

Allegheny Hollow  Oak  Land  Trust  

Anchor  Supply  Property

KEY-­‐LTA-­‐3-­‐6 $51,700 $40,000 3 Open  Space  Acquisition  (LT)

$150,000 LT_Key

Allegheny Hollow  Oak  Land  Trust  

Komichak  Property  Acquisition

BRC-­‐LTA-­‐15-­‐118

$22,000 $22,000 15 Open  Space  Acquisition  (LT)

$45,650 LT_Key

Page 20: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  20  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Allegheny Hollow  Oak  Land  Trust  

Montour  Run  Watershed  Conservation  Plan

KEY-­‐RCP-­‐96-­‐15

$40,000 $56,500 3 Planning  (RIV) $96,500 RIVER_Key

Allegheny Hollow  Oak  Land  Trust  

Trieschock  Property  Acquisition

BRC-­‐LTA-­‐11-­‐13

$85,000 $85,000 11 Open  Space  Acquisition  (LT)

$170,200 LT_Key

Allegheny Homestead  Borough 16th  Ave,  McLean  &  Sullivan  Playgrounds  &  Frick  Pk

BRC-­‐PRD-­‐9-­‐94

$40,000 $40,000 9 Park  Rehabilitation  and  Development  (COMM)

$80,000 COMM_Key

Allegheny Homestead  Borough Peer-­‐to-­‐Peer KEY-­‐TAG-­‐3-­‐92

$7,500 $7,500 3 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$8,250 COMM_Key

Allegheny Indiana  Township Community  Swimming  Pool  Feasibility  Study

BRC-­‐TAG-­‐6-­‐86

$12,500 $12,500 6 Feasibility  Studies  (COMM)

$25,000 COMM_Key

Allegheny Indiana  Township Connomacher  Property  Acquisition

BRC-­‐ACQ-­‐16-­‐23

$150,000 $150,000 16 Acquisition  (COMM)

$300,000 COMM_Key

Allegheny Indiana  Township Emmerling  Park BRC-­‐PRD-­‐11-­‐46

$125,000 $125,000 11 Park  Rehabilitation  and  Development  (COMM)

$378,700 COMM_Key

Allegheny Indiana  Township Middle  Road  and  Emmerling  Parks

BRC-­‐PRD-­‐8-­‐89

$65,600 $65,000 8 Park  Rehabilitation  and  Development  (COMM)

$143,500 COMM_Key

Page 21: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  21  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Allegheny Indiana  Township Middle  Road  Park KEY-­‐PRD-­‐5-­‐94

$25,337 $25,000 5 Park  Rehabilitation  and  Development  (COMM)

$50,673 COMM_Key

Allegheny Ingram  Borough Foster  Park BRC-­‐SC-­‐10-­‐83

$27,400 $25,000 10 Small  Communities/Small  Projects  (COMM)

$54,800 COMM_Key

Allegheny Ingram  Borough Foster  Park KEY-­‐PRD-­‐4-­‐70

$58,600 $55,000 4 Park  Rehabilitation  and  Development  (COMM)

$117,200 COMM_Key

Allegheny Jefferson  Borough Gill  Hall  Park  -­‐  Phase  II

KEY-­‐PRD-­‐4-­‐72

$38,300 $38,000 4 Park  Rehabilitation  and  Development  (COMM)

$76,600 COMM_Key

Allegheny Jefferson  Borough Master  Site  Development  Plan

KEY-­‐TAG-­‐2-­‐68

$4,000 $4,000 2 Master  Site  Plans  (COMM)

$8,000 COMM_Key

Allegheny Jefferson  Hills  Borough

Beedle  Park  -­‐  Phase  1-­‐  Development

BRC-­‐PRD-­‐18-­‐74

$174,786 $100,000 18 Park  Rehabilitation  and  Development  (COMM)

$349,571 COMM_Key

Allegheny Jefferson Hills Borough

Beedle Park-Phase-1B-Development

BRC-PRD-19-85

$126,696.00 $110,000.00 19 Park Rehabilitation and Development (COMM)

$253,392.00 COMM_Key

Page 22: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  22  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Allegheny Jefferson Hills Borough

Beedle Park-Phase-1B-Development

BRC-PRD-19-85

$126,696.00 $110,000.00 19 Park Rehabilitation and Development (COMM)

$253,392.00 COMM_Key

Allegheny Jefferson Hills Borough

Beedle Park-Phase-1B-Development

BRC-PRD-19-85

$126,696.00 $110,000.00 19 Park Rehabilitation and Development (COMM)

$253,392.00 COMM_Key

Allegheny Jefferson  Hills  Borough

Comprehensive  Rec.  Park  &  Open  Space  Plan

BRC-­‐TAG-­‐13.3-­‐475

$22,000 $22,000 13.3 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$44,000 COMM_Key

Allegheny Jefferson  Hills  Borough

Gill  Hall  Park BRC-­‐PRD-­‐6-­‐88

$50,000 $50,000 6 Park  Rehabilitation  and  Development  (COMM)

$100,000 COMM_Key

Allegheny Jefferson  Hills  Borough

Peters  Creek  Greenway  Plan

BRC-­‐TAG-­‐7-­‐92

$12,500 $12,500 7 Greenway  Plans  (COMM)

$25,000 COMM_Key

Allegheny Kennedy  Township Fairhaven  Park BRC-­‐PRD-­‐13.3-­‐377

$30,000 $30,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$60,000 COMM_Key

Allegheny Leetsdale  Borough Henle  Park KEY-­‐SC-­‐5-­‐110

$17,600 $17,600 5 Small  Communities/Small  Projects  (COMM)

$33,600 COMM_Key

Page 23: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  23  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Allegheny Leetsdale  Borough Riverfront  Greenway  Master  Plan

BRC-­‐TAG-­‐11-­‐216

$10,000 $10,000 11 Master  Site  Plans  (COMM)

$20,000 COMM_Key

Allegheny Liberty  Borough Liberty  Park BRC-­‐SC-­‐12-­‐105

$20,000 $20,000 12 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Allegheny Liberty  Borough Liberty,  Manor  and  Memory  Lane  Parks

BRC-­‐SC-­‐9-­‐115

$13,000 $33,000 9 Small  Communities/Small  Projects  (COMM)

$46,000 COMM_Key

Allegheny Lincoln  Borough Bell  Bridge  Field KEY-­‐ACQ-­‐2-­‐83

$19,000 $15,000 2 Acquisition  (COMM)

$38,000 COMM_Key

Allegheny Marshall  Township Comprehensive  Recreation,  Park  and  Open  Space  Plan

BRC-­‐TAG-­‐13-­‐195

$20,000 $20,000 13 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$40,000 COMM_Key

Allegheny Marshall  Township Marshall  Township  Brush  Creek  Trail  Development

BRC-­‐PRD-­‐17-­‐136

$240,499 $240,000 17 Park  Rehabilitation  and  Development  (COMM)

$480,998 COMM_Key

Allegheny Marshall  Township Two  Sites KEY-­‐PRD-­‐4-­‐97

$332,000 $100,000 4 Park  Rehabilitation  and  Development  (COMM)

$663,000 COMM_Key

Page 24: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  24  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Allegheny McCandless  Town Vestal  Field BRC-­‐PRD-­‐10-­‐125

$68,000 $60,000 10 Park  Rehabilitation  and  Development  (COMM)

$187,493 COMM_Key

Allegheny McCandless  Town Vincentian  Recreation  Complex

BRC-­‐PRD-­‐6-­‐109

$65,000 $65,000 6 Park  Rehabilitation  and  Development  (COMM)

$246,465 COMM_Key

Allegheny McKees  Rocks  Borough

Rangers  Field BRC-­‐PRD-­‐11-­‐55

$100,800 $60,000 11 Park  Rehabilitation  and  Development  (COMM)

$201,700 COMM_Key

Allegheny McKeesport  City Riverview  Playground

KEY-­‐PRD-­‐1-­‐81

$48,647 $48,600 1 Park  Rehabilitation  and  Development  (COMM)

$97,295 COMM_Key

Allegheny McKeesport  City Tenth  Ward  Boat  Launch

BRC-­‐RCD-­‐8-­‐23

$17,000 $22,000 8 Development  (RIV)

$34,000 RIVER_Key

Allegheny McKeesport  City Two  Sites KEY-­‐PRD-­‐2-­‐95

$133,450 $133,400 2 Park  Rehabilitation  and  Development  (COMM)

$266,900 COMM_Key

Allegheny McKeesport  City Yough  River  Trail  Connection

KEY-­‐RTA-­‐3-­‐12

$158,000 $100,000 3 Acquisition  (RT) $200,000 RT_Key

Page 25: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  25  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Allegheny McKeesport  City Youghiogheny  Linear  Park  Master  Plan

KEY-­‐TAG-­‐4-­‐98

$15,000 $15,000 4 Master  Site  Plans  (COMM)

$30,000 COMM_Key

Allegheny McKeesport  City Youghiogheny  River  Trail

KEY-­‐RTD-­‐5-­‐8

$47,000 $35,000 5 Rail  Rehabilitation  and  Development  (RT)

$94,000 RT_Key

Allegheny McKeesport  City Youghiogheny  River  Trail  15th-­‐11th  St.

KEY-­‐RTD-­‐4-­‐13

$30,000 $30,000 4 Rail  Rehabilitation  and  Development  (RT)

$60,000 RT_Key

Allegheny Millvale  Borough Community  Park KEY-­‐SC-­‐2-­‐101

$20,000 $20,000 2 Small  Communities/Small  Projects  (COMM)

$146,766 COMM_Key

Allegheny Millvale  Borough Millvale  River  Trail  &  Park

BRC-­‐PRD-­‐6-­‐114

$65,000 $65,000 6 Park  Rehabilitation  and  Development  (COMM)

$130,000 COMM_Key

Allegheny Millvale  Borough Riverfront  Trail BRC-­‐SC-­‐10-­‐90

$40,000 $40,000 10 Small  Communities/Small  Projects  (COMM)

$65,000 COMM_Key

Allegheny Millvale  Borough Riverfront  Trail  Phase  2  Development,  Back  Channel  Bridge

BRC-­‐PRD-­‐12-­‐172

$40,000 $40,000 12 Park  Rehabilitation  and  Development  (COMM)

$80,000 COMM_Key

Page 26: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  26  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Allegheny Monroeville  Municipality

Beechwood  Park KEY-­‐PRD-­‐3-­‐141

$25,000 $25,000 3 Park  Rehabilitation  and  Development  (COMM)

$50,000 COMM_Key

Allegheny Monroeville  Municipality

Comprehensive  and  Master  Site  Plans

KEY-­‐TAG-­‐3-­‐142

$25,000 $25,000 3 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$50,000 COMM_Key

Allegheny Monroeville  Municipality

Monroeville  Park  System  Rehabilitation  -­‐  Phase  IV

BRC-­‐PRD-­‐9-­‐138

$300,000 $200,000 9 Park  Rehabilitation  and  Development  (COMM)

$671,400 COMM_Key

Allegheny Montour  Trail  Council  

Montour  Trail  -­‐  Phase  10

KEY-­‐RTD-­‐4-­‐14

$130,000 $100,000 4 Rail  Rehabilitation  and  Development  (RT)

$260,000 RT_Key

Allegheny Montour  Trail  Council  

Montour  Trail  -­‐  Phase  8E3  (Piney  Fork  Run  Bridge)

BRC-­‐RTD-­‐10-­‐9

$94,000 $90,000 10 Rail  Rehabilitation  and  Development  (RT)

$194,500 RT_Key

Allegheny Montour  Trail  Council  

Montour  Trail  Extension

KEY-­‐RTA-­‐3-­‐14

$15,000 $13,500 3 Acquisition  (RT) $27,000 RT_Key

Allegheny Montour  Trail  Council  

Montour  Trail  Restoration

BRC-­‐RTD-­‐11-­‐8

$200,000 $50,000 11 Rail  Rehabilitation  and  Development  (RT)

$517,000 RT_Key

Page 27: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  27  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Allegheny Moon  Township Bon  Air  Golf  Course  Acquisition

BRC-­‐ACQ-­‐11-­‐254

$1,285,500 $300,000 11 Acquisition  (COMM)

$2,571,000 COMM_Key

Allegheny Moon  Township Moon  Park KEY-­‐PRD-­‐5-­‐137

$61,795 $60,000 5 Park  Rehabilitation  and  Development  (COMM)

$123,590 COMM_Key

Allegheny Moon  Township Moon  Park  Master  Plan

BRC-­‐TAG-­‐12-­‐253

$23,200 $23,200 12 Master  Site  Plans  (COMM)

$46,500 COMM_Key

Allegheny Moon  Township Moon  Waterfront  Park  Master  Site  Plan

BRC-­‐TAG-­‐16-­‐65

$30,000 $30,000 16 Master  Site  Plans  (COMM)

$60,000 COMM_Key

Allegheny Moon  Township Olson  Property  Acquisition

BRC-­‐ACQ-­‐7-­‐134

$22,500 $22,000 7 Acquisition  (COMM)

$45,000 COMM_Key

Allegheny Mount  Lebanon  Municipality

Comp.  Recreation,  Park  &  Open  Space  Plan

KEY-­‐TAG-­‐5-­‐138

$20,000 $20,000 5 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$40,000 COMM_Key

Allegheny Mount  Lebanon  Municipality

Ice  Rink  Rehabilitation

BRC-­‐PRD-­‐9-­‐141

$324,600 $150,000 9 Park  Rehabilitation  and  Development  (COMM)

$649,000 COMM_Key

Allegheny Mount  Lebanon  Municipality

Main  Park BRC-­‐PRD-­‐7-­‐135

$32,000 $32,000 7 Park  Rehabilitation  and  Development  (COMM)

$64,000 COMM_Key

Page 28: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  28  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Allegheny Mount  Lebanon  Municipality

Main  Park KEY-­‐PRD-­‐3-­‐146

$30,000 $30,000 3 Park  Rehabilitation  and  Development  (COMM)

$60,000 COMM_Key

Allegheny Mount  Oliver  Borough

Ormsby  Park KEY-­‐PRD-­‐3-­‐147

$15,000 $15,000 3 Park  Rehabilitation  and  Development  (COMM)

$30,000 COMM_Key

Allegheny Mount Oliver Borough Ormsby Park Phase 2-Development

BRC-PRD-19-99

$95,054.40 $95,000.00 19 Park Rehabilitation and Development (COMM)

$190,108.80 COMM_Key

Allegheny Mount Oliver Borough Ormsby Park Phase 2-Development

BRC-PRD-19-99

$95,054.40 $95,000.00 19 Park Rehabilitation and Development (COMM)

$190,108.80 COMM_Key

Allegheny Mount Oliver Borough Ormsby Park Phase 2-Development

BRC-PRD-19-99

$95,054.40 $95,000.00 19 Park Rehabilitation and Development (COMM)

$190,108.80 COMM_Key

Allegheny Mount  Oliver  Borough

Transverse  Park BRC-­‐SC-­‐11-­‐138

$40,000 $40,000 11 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Page 29: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  29  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Allegheny Munhall  Borough Kennedy  and  Park  Square  Parks

KEY-­‐PRD-­‐3-­‐148

$120,000 $100,000 3 Park  Rehabilitation  and  Development  (COMM)

$276,700 COMM_Key

Allegheny Munhall  Borough Woodhill  Park  Master  Plan

KEY-­‐TAG-­‐4-­‐110

$10,000 $10,000 4 Master  Site  Plans  (COMM)

$20,000 COMM_Key

Allegheny National  Aviary  in  Pittsburgh,  Inc.  

Education/Discovery  Complex

KEY-­‐ZOO-­‐94-­‐5

$150,000 $150,000 1 Zoo $300,000 COMM_Key

Allegheny National  Aviary  in  Pittsburgh,  Inc.  

Flight  Zone  Theatre BRC-­‐PRD-­‐13-­‐129

$2,000,000 $200,000 13 Park  Rehabilitation  and  Development  (COMM)

$4,000,000 COMM_Key

Allegheny North  Area  Environmental  Council  

Pine  Creek  Watershed  River  Conservation  Plan

BRC-­‐RCP-­‐12-­‐10

$84,100 $65,000 12 Planning  (RIV) $168,300 RIVER_Key

Allegheny North  Fayette  Township

Amphitheater BRC-­‐PRD-­‐12-­‐178

$192,400 $145,000 12 Park  Rehabilitation  and  Development  (COMM)

$384,800 COMM_Key

Allegheny North  Fayette  Township

Hankey  Farms  Pool  Study

BRC-­‐TAG-­‐13-­‐200

$15,000 $10,000 13 Feasibility  Studies  (COMM)

$30,000 COMM_Key

Allegheny North  Fayette  Township

Peer-­‐to-­‐Peer KEY-­‐TAG-­‐2-­‐183

$7,500 $7,500 2 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$8,250 COMM_Key

Page 30: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  30  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Allegheny North  Fayette  Township

Two  Sites BRC-­‐PRD-­‐6-­‐128

$56,350 $50,000 6 Park  Rehabilitation  and  Development  (COMM)

$112,700 COMM_Key

Allegheny North  Versailles  Township

Comprehensive  Recreation,  Park  and  Open  Space  Plan

BRC-­‐TAG-­‐7-­‐140

$15,000 $15,000 7 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$30,000 COMM_Key

Allegheny North  Versailles  Township

Fairhaven  and  Keith  Parks

KEY-­‐PRD-­‐3-­‐157

$53,000 $53,000 3 Park  Rehabilitation  and  Development  (COMM)

$106,000 COMM_Key

Allegheny North  Versailles  Township

Seven  Sites BRC-­‐PRD-­‐10-­‐130

$72,600 $50,000 10 Park  Rehabilitation  and  Development  (COMM)

$145,000 COMM_Key

Allegheny O'Hara  Township Riverfront  Trail  -­‐  Phase  I

BRC-­‐PRD-­‐11-­‐63

$250,000 $150,000 11 Park  Rehabilitation  and  Development  (COMM)

$775,000 COMM_Key

Allegheny O'Hara  Township St.  Mary's  Church  Ballfield  Acquisition

BRC-­‐ACQ-­‐11.5-­‐12

$116,200 $116,000 11.5 Acquisition  (COMM)

$232,500 COMM_Key

Allegheny Oakdale  Borough Borough  Park BRC-­‐SC-­‐11-­‐141

$20,000 $20,000 11 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Page 31: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  31  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Allegheny Oakmont  Borough Oakmont  Riverside  Park-­‐Development

BRC-­‐PRD-­‐16-­‐151

$270,000 $250,000 16 Park  Rehabilitation  and  Development  (COMM)

$675,000 COMM_Key

Allegheny Oakmont  Borough Riverside  Park  Master  Site  Plan

BRC-­‐TAG-­‐14-­‐227

$22,500 $22,500 14 Master  Site  Plans  (COMM)

$45,000 COMM_Key

Allegheny Ohio  Township Community  Park BRC-­‐PRD-­‐7-­‐145

$500,000 $250,000 7 Park  Rehabilitation  and  Development  (COMM)

$1,000,000 COMM_Key

Allegheny Ohio  Township Community  Park  -­‐  Phase  II

BRC-­‐PRD-­‐8-­‐141

$250,000 $250,000 8 Park  Rehabilitation  and  Development  (COMM)

$500,000 COMM_Key

Allegheny Ohio  Township Community  Parks  Master  Plans

KEY-­‐TAG-­‐5-­‐152

$16,250 $16,200 5 Master  Site  Plans  (COMM)

$37,500 COMM_Key

Allegheny Penn  Hills  Municipality

Duff  Park KEY-­‐PRD-­‐3-­‐163

$12,800 $12,800 3 Park  Rehabilitation  and  Development  (COMM)

$25,700 COMM_Key

Allegheny Penn  Hills  Municipality

Six  Sites BRC-­‐PRD-­‐6-­‐139

$199,462 $130,000 6 Park  Rehabilitation  and  Development  (COMM)

$398,924 COMM_Key

Page 32: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  32  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Allegheny Pennsbury  Village  Borough

Pennsbury  Park BRC-­‐SC-­‐11-­‐146

$24,500 $24,500 11 Small  Communities/Small  Projects  (COMM)

$29,100 COMM_Key

Allegheny Pennsylvania  Environmental  Council,  Inc.  

Pittsburgh's  Three  Rivers  Conservation  Plan

BRC-­‐RCP-­‐7-­‐12

$135,000 $135,000 7 Planning  (RIV) $270,000 RIVER_Key

Allegheny Pine  Township Community  Center-­‐-­‐Phase  I

BRC-­‐PRD-­‐13-­‐412

$250,000 $250,000 13 Park  Rehabilitation  and  Development  (COMM)

$500,000 COMM_Key

Allegheny Pine  Township Community  Park KEY-­‐PRD-­‐2-­‐124

$73,925 $73,900 2 Park  Rehabilitation  and  Development  (COMM)

$147,850 COMM_Key

Allegheny Pine  Township Multi-­‐Municipal  Pool  Feasibility  Study

BRC-­‐TAG-­‐8-­‐156

$6,500 $6,500 8 Feasibility  Studies  (COMM)

$13,000 COMM_Key

Allegheny Pine Township Pine Community Park-Development

BRC-PRD-19-105

$72,657.00 $72,500.00 19 Park Rehabilitation and Development (COMM)

$145,314.00 COMM_Key

Allegheny Pine Township Pine Community Park-Development

BRC-PRD-19-105

$72,657.00 $72,500.00 19 Park Rehabilitation and Development (COMM)

$145,314.00 COMM_Key

Page 33: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  33  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Allegheny Pine Township Pine Community Park-Development

BRC-PRD-19-105

$72,657.00 $72,500.00 19 Park Rehabilitation and Development (COMM)

$145,314.00 COMM_Key

Allegheny Pitcairn  Borough Sugar  Camp  Park KEY-­‐SC-­‐1-­‐108

$13,330 $13,300 1 Small  Communities/Small  Projects  (COMM)

$19,490 COMM_Key

Allegheny Pittsburgh  City Athletic  Fields  Feasibility  Study

KEY-­‐TAG-­‐5-­‐163

$30,000 $30,000 5 Feasibility  Studies  (COMM)

$60,000 COMM_Key

Allegheny Pittsburgh  City Bike  and  Blade  Station

BRC-­‐PRD-­‐8-­‐157

$100,000 $100,000 8 Park  Rehabilitation  and  Development  (COMM)

$892,800 COMM_Key

Allegheny Pittsburgh  City Chartiers/Ohio  Master  Plan

KEY-­‐RTP-­‐5-­‐13

$17,500 $17,500 5 Master  Plans  (RT)

$35,000 RT_Key

Allegheny Pittsburgh  City Chateau  II BRC-­‐RTD-­‐7-­‐12

$120,000 $120,000 7 Rail  Rehabilitation  and  Development  (RT)

$240,000 RT_Key

Allegheny Pittsburgh  City City-­‐wide  Pool  Feasibility  Study

KEY-­‐TAG-­‐4-­‐128

$35,000 $50,000 4 Feasibility  Studies  (COMM)

$100,000 COMM_Key

Allegheny Pittsburgh  City Commons  Park  -­‐  Development

BRC-­‐PRD-­‐17-­‐147

$50,000 $50,000 17 Park  Rehabilitation  and  Development  (COMM)

$100,000 COMM_Key

Page 34: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  34  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Allegheny Pittsburgh  City Downtown/Oakland  Riverview  Trail  (Eliza  Furnace)

KEY-­‐RTD-­‐3-­‐17

$100,000 $100,000 3 Rail  Rehabilitation  and  Development  (RT)

$2,790,000 RT_Key

Allegheny Pittsburgh  City Emerald  View  Park:  Fort  Pitt  Tunnel  Trail  Connection  -­‐  Development

BRC-­‐PRD-­‐18-­‐178

$213,064 $133,000 18 Park  Rehabilitation  and  Development  (COMM)

$266,330 COMM_Key

Allegheny Pittsburgh  City Four  Sites KEY-­‐PRD-­‐5-­‐164

$250,000 $250,000 5 Park  Rehabilitation  and  Development  (COMM)

$500,000 COMM_Key

Allegheny Pittsburgh  City Heritage  Trail/Riverfront  Park

KEY-­‐ACQ-­‐2-­‐126

$53,600 $50,000 2 Acquisition  (COMM)

$107,200 COMM_Key

Allegheny Pittsburgh  City Master  Site  Development  Plans

KEY-­‐TAG-­‐3-­‐173

$160,000 $160,000 3 Master  Site  Plans  (COMM)

$320,000 COMM_Key

Allegheny Pittsburgh  City Natural  Areas  Study BRC-­‐TAG-­‐11.5-­‐32

$56,300 $86,975 11.5 Conservation/Sound  Land  Use  (COMM)

$241,000 COMM_Key

Allegheny Pittsburgh  City Nine  Mile  Run KEY-­‐RCP-­‐96-­‐17

$65,000 $65,000 3 Planning  (RIV) $130,000 RIVER_Key

Allegheny Pittsburgh  City North  Shore  of  the  Ohio  Trail

KEY-­‐RTA-­‐5-­‐14

$95,000 $95,000 5 Acquisition  (RT) $190,000 RT_Key

Allegheny Pittsburgh  City North  Shore  Trail KEY-­‐ACQ-­‐1-­‐110

$100,000 $100,000 1 Acquisition  (COMM)

$350,000 COMM_Key

Page 35: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  35  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Allegheny Pittsburgh  City Panther  Hollow KEY-­‐PRD-­‐4-­‐129

$223,000 $223,000 4 Park  Rehabilitation  and  Development  (COMM)

$446,000 COMM_Key

Allegheny Pittsburgh  City Route  28  Trail BRC-­‐PRD-­‐13.3-­‐565

$1,000,000 $500,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$2,000,000 COMM_Key

Allegheny Pittsburgh  City Washington's  Landing

KEY-­‐PRD-­‐2-­‐125

$425,000 $250,000 2 Park  Rehabilitation  and  Development  (COMM)

$868,700 COMM_Key

Allegheny Pleasant  Hills  Borough

Mowry  Park KEY-­‐PRD-­‐2-­‐128

$50,000 $50,000 2 Park  Rehabilitation  and  Development  (COMM)

$100,000 COMM_Key

Allegheny Pleasant  Hills  Borough

Mowry  Park KEY-­‐PRD-­‐3-­‐177

$25,000 $25,000 3 Park  Rehabilitation  and  Development  (COMM)

$50,000 COMM_Key

Allegheny Port  Authority  of  Allegheny  County  

Gateway  Station  Plaza

BRC-­‐PRD-­‐13-­‐415

$1,100,000 $200,000 13 Park  Rehabilitation  and  Development  (COMM)

$2,200,000 COMM_Key

Page 36: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  36  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Allegheny Port  Vue  Borough Jim  Campbell  Field-­‐  Development

BRC-­‐SC-­‐18-­‐39

$32,500 $32,500 18 Small  Communities/Small  Projects  (COMM)

$45,700 COMM_Key

Allegheny Port  Vue  Borough Recreation  Complex KEY-­‐PRD-­‐2-­‐129

$30,000 $30,000 2 Park  Rehabilitation  and  Development  (COMM)

$60,000 COMM_Key

Allegheny Regional  Trail  Corporation  

Union  Railroad  Property  Acquisition

BRC-­‐RTA-­‐12-­‐1

$76,900 $76,900 12 Acquisition  (RT) $153,700 RT_Key

Allegheny Regional  Trail  Corporation  

US  Steel  Acquisition BRC-­‐RTA-­‐11-­‐11

$250,000 $200,000 11 Acquisition  (RT) $1,100,000 RT_Key

Allegheny Regional  Trail  Corporation  

Youghiogheny  River  Trail  -­‐  Phase  4

KEY-­‐RTD-­‐4-­‐18

$160,000 $100,000 4 Rail  Rehabilitation  and  Development  (RT)

$323,300 RT_Key

Allegheny Reserve  Township Spring  Garden  Park KEY-­‐SC-­‐1-­‐115

$19,500 $19,500 1 Small  Communities/Small  Projects  (COMM)

$21,450 COMM_Key

Allegheny Richland  Township Comp.  Rec.  Park  &  Open  Space  Plan

BRC-­‐TAG-­‐13.6-­‐604

$20,000 $20,000 13.6 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$40,000 COMM_Key

Allegheny Richland  Township Richland  Park BRC-­‐PRD-­‐13.3-­‐421

$200,000 $200,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$635,000 COMM_Key

Page 37: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  37  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Allegheny Riverlife   Mon  Wharf  Switchback

BRC-­‐PRD-­‐16-­‐246

$1,000,000 $7,225 16 Park  Rehabilitation  and  Development  (COMM)

$2,000,000 RIVER_Key

Allegheny Robinson  Township Comprehensive  Park,  Recreation  and    Open  Space  Plan

BRC-­‐TAG-­‐13-­‐204

$21,000 $21,000 13 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$42,000 COMM_Key

Allegheny Ross  Township Ann  Alison  Hoover  Memorial  Park

BRC-­‐PRD-­‐8-­‐162

$40,000 $25,000 8 Park  Rehabilitation  and  Development  (COMM)

$99,700 COMM_Key

Allegheny Ross  Township Community  Park BRC-­‐PRD-­‐6-­‐159

$300,000 $100,000 6 Park  Rehabilitation  and  Development  (COMM)

$1,300,000 COMM_Key

Allegheny Ross  Township Comp.  Parks,  Rec.  &  Open  Space  Plan

BRC-­‐TAG-­‐13.6-­‐605

$25,000 $25,000 13.6 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$50,000 COMM_Key

Allegheny Ross Township Herge Park-Development

BRC-PRD-19-109

$155,000.00 $155,000.00 19 Park Rehabilitation and Development (COMM)

$310,000.00 COMM_Key

Page 38: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  38  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Allegheny Ross Township Herge Park-Development

BRC-PRD-19-109

$155,000.00 $155,000.00 19 Park Rehabilitation and Development (COMM)

$310,000.00 COMM_Key

Allegheny Ross Township Herge Park-Development

BRC-PRD-19-109

$155,000.00 $155,000.00 19 Park Rehabilitation and Development (COMM)

$310,000.00 COMM_Key

Allegheny Rosslyn  Farms  Borough

Borough  Park BRC-­‐PRD-­‐14-­‐169

$73,300 $73,300 14 Park  Rehabilitation  and  Development  (COMM)

$146,800 COMM_Key

Allegheny Rosslyn  Farms  Borough

Community  Center BRC-­‐SC-­‐11-­‐151

$37,200 $37,200 11 Small  Communities/Small  Projects  (COMM)

$54,300 COMM_Key

Allegheny Rosslyn  Farms  Borough

Community  Swimming  Pool

BRC-­‐PRD-­‐7-­‐168

$121,199 $120,000 7 Park  Rehabilitation  and  Development  (COMM)

$242,398 COMM_Key

Allegheny Scott  Conservancy   Carleton  Manor  Property

BRC-­‐LTA-­‐11-­‐24

$19,000 $19,000 11 Open  Space  Acquisition  (LT)

$38,000 LT_Key

Allegheny Scott  Conservancy   Dead  Man's  Hollow KEY-­‐LTA-­‐4-­‐17

$70,000 $60,000 4 Open  Space  Acquisition  (LT)

$140,200 LT_Key

Allegheny Scott  Conservancy   Kane  Woods BRC-­‐LTA-­‐7-­‐16

$474,250 $475,000 7 Critical  Habitat  Acquisition  (LT)

$948,500 LT_Key

Page 39: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  39  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Allegheny Scott  Township Hope  Street  Acqusition

BRC-­‐ACQ-­‐13-­‐226

$24,000 $24,000 13 Acquisition  (COMM)

$48,000 COMM_Key

Allegheny Scott  Township Meadowlark  and  Larsen  Parks  -­‐  Development

BRC-­‐PRD-­‐17-­‐150

$45,396 $45,400 17 Park  Rehabilitation  and  Development  (COMM)

$90,792 COMM_Key

Allegheny Scott  Township Scott  Park BRC-­‐PRD-­‐13-­‐427

$55,500 $55,500 13 Park  Rehabilitation  and  Development  (COMM)

$111,000 COMM_Key

Allegheny Scott  Township Scott  Park  &  Scott  Conservancy  Master  Site  Plan

BRC-­‐TAG-­‐13-­‐490

$50,000 $50,000 13 Master  Site  Plans  (COMM)

$115,700 COMM_Key

Allegheny Sewickley  Borough Riverfront  Park KEY-­‐PRD-­‐5-­‐180

$160,000 $150,000 5 Park  Rehabilitation  and  Development  (COMM)

$600,000 COMM_Key

Allegheny Sewickley  Borough Sewickley  Valley  Rivers  Conservation  Plan

BRC-­‐RCP-­‐12-­‐16

$125,000 $100,000 12 Planning  (RIV) $250,000 COMM_Key

Allegheny Sewickley  Borough Sewickley  Valley  Rivers  Conservation  Plan

BRC-­‐RCP-­‐12-­‐16

$125,000 $25,000 12 Planning  (RIV) $250,000 RIVER_Key

Page 40: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  40  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Allegheny Sewickley  Hills  Borough

Community  Park BRC-­‐PRD-­‐10-­‐136

$93,500 $70,000 10 Park  Rehabilitation  and  Development  (COMM)

$187,000 COMM_Key

Allegheny Shaler  Township Fall  Run  Park KEY-­‐PRD-­‐4-­‐136

$200,000 $75,000 4 Park  Rehabilitation  and  Development  (COMM)

$400,000 COMM_Key

Allegheny Shaler  Township McElheny  Road  Park KEY-­‐ACQ-­‐1-­‐124

$30,000 $30,000 1 Acquisition  (COMM)

$161,200 COMM_Key

Allegheny Sharpsburg  Borough 13th  Street  Boat  Ramp/Riverside  Park

BRC-­‐PRD-­‐13-­‐141

$65,300 $65,300 13 Park  Rehabilitation  and  Development  (COMM)

$622,700 COMM_Key

Allegheny Sharpsburg  Borough Improvements  to  13th  Street  Boat  Ramp  Site-­‐Phase  II

BRC-­‐RCD-­‐16-­‐179

$50,000 $50,000 16 Development  (RIV)

$110,000 COMM_Key

Allegheny South  Fayette  Township

Community  Center  Feasibility  Study

BRC-­‐TAG-­‐13-­‐207

$25,000 $25,000 13 Feasibility  Studies  (COMM)

$50,000 COMM_Key

Allegheny South  Fayette  Township

Community  Center-­‐Development

BRC-­‐PRD-­‐16-­‐160

$500,000 $200,000 16 Park  Rehabilitation  and  Development  (COMM)

$1,000,000 COMM_Key

Page 41: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  41  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Allegheny South  Fayette  Township

Fairview  Park    -­‐  Phase  I

KEY-­‐PRD-­‐4-­‐143

$200,000 $100,000 4 Park  Rehabilitation  and  Development  (COMM)

$500,000 COMM_Key

Allegheny South  Fayette  Township

Fairview  Park  Athletic  Fields

BRC-­‐PRD-­‐12-­‐200

$500,000 $300,000 12 Park  Rehabilitation  and  Development  (COMM)

$1,000,000 COMM_Key

Allegheny South  Fayette  Township

Master  Plan  -­‐  4  Sites BRC-­‐TAG-­‐9-­‐193

$27,500 $27,000 9 Master  Site  Plans  (COMM)

$55,000 COMM_Key

Allegheny South  Fayette  Township

Morgan  Park BRC-­‐PRD-­‐11-­‐80

$65,000 $65,000 11 Park  Rehabilitation  and  Development  (COMM)

$130,000 COMM_Key

Allegheny South  Fayette  Township

Morgan  Property  Acquisition

BRC-­‐ACQ-­‐13.3-­‐550

$67,500 $67,500 13.3 Acquisition  (COMM)

$500,000 COMM_Key

Allegheny South  Fayette  Township

Municipal  Park  Master  Site  Plan

BRC-­‐TAG-­‐14-­‐242

$17,000 $17,000 14 Master  Site  Plans  (COMM)

$34,000 COMM_Key

Allegheny South Park Township Montour Trail - Library Viaduct to Pleasant Street Phase 8A4 - Development

BRC-PRD-19-117

$243,720.00 $243,000.00 19 Park Rehabilitation and Development (COMM)

$487,440.00 COMM_Key

Allegheny South Park Township Montour Trail - Library Viaduct to Pleasant Street Phase 8A4 - Development

BRC-PRD-19-117

$243,720.00 $243,000.00 19 Park Rehabilitation and Development (COMM)

$487,440.00 COMM_Key

Page 42: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  42  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Allegheny South Park Township Montour Trail - Library Viaduct to Pleasant Street Phase 8A4 - Development

BRC-PRD-19-117

$243,720.00 $243,000.00 19 Park Rehabilitation and Development (COMM)

$487,440.00 COMM_Key

Allegheny South  Versailles  Township

Coulter  Playground  -­‐  Phase  II

KEY-­‐SC-­‐5-­‐188

$10,000 $10,000 5 Small  Communities/Small  Projects  (COMM)

$10,000 COMM_Key

Allegheny South  Versailles  Township

Ninth  Street  Playground

KEY-­‐SC-­‐3-­‐201

$14,800 $14,800 3 Small  Communities/Small  Projects  (COMM)

$16,400 COMM_Key

Allegheny Sports  and  Exhibition  Authority  of  Pittsburgh  &  Allegheny  County  

Convention  Center  Riverfront  Park

BRC-­‐PRD-­‐12-­‐202

$4,500,000 $500,000 12 Park  Rehabilitation  and  Development  (COMM)

$9,963,500 COMM_Key

Allegheny Sports  and  Exhibition  Authority  of  Pittsburgh  &  Allegheny  County  

Convention  Center  Riverfront  Park

BRC-­‐PRD-­‐8-­‐182

$1,000,000 $500,000 8 Park  Rehabilitation  and  Development  (COMM)

$8,700,000 COMM_Key

Allegheny Sports  and  Exhibition  Authority  of  Pittsburgh  &  Allegheny  County  

North  Shore  Riverfront  Park-­‐West  Esplanade

BRC-­‐PRD-­‐8-­‐183

$1,000,000 $500,000 8 Park  Rehabilitation  and  Development  (COMM)

$2,114,000 COMM_Key

Page 43: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  43  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Allegheny Steel  Industry  Heritage  Corporation  

Riverfront  Heritage  Trail

BRC-­‐RTD-­‐6-­‐19

$100,000 $100,000 6 Rail  Rehabilitation  and  Development  (RT)

$200,000 RT_Key

Allegheny Steel  Industry  Heritage  Corporation  

Steel  Valley  Trail  Phase  II

BRC-­‐RTD-­‐7-­‐16

$227,000 $200,000 7 Rail  Rehabilitation  and  Development  (RT)

$591,000 RT_Key

Allegheny Steel  Industry  Heritage  Corporation  

Steel  Valley  Trail  Plan

KEY-­‐RTP-­‐95-­‐26

$24,700 $24,700 1 Master  Plans  (RT)

$49,400 RT_Key

Allegheny Stowe  Township Ohio  River  Trail  -­‐  Pittsburgh  to  Coraopolis  Feasibility  Study

BRC-­‐RTP-­‐16-­‐183

$27,000 $27,000 16 Feasibility  Studies  (RT)

$54,000 COMM_Key

Allegheny Swissvale  Borough Filmet  Playground BRC-­‐PRD-­‐9-­‐204

$50,000 $50,000 9 Park  Rehabilitation  and  Development  (COMM)

$100,000 COMM_Key

Allegheny Swissvale  Borough Memorial  Park BRC-­‐PRD-­‐13-­‐147

$270,000 $100,000 13 Park  Rehabilitation  and  Development  (COMM)

$540,000 COMM_Key

Page 44: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  44  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Allegheny Swissvale  Borough Memorial  Park KEY-­‐PRD-­‐3-­‐216

$37,000 $37,000 3 Park  Rehabilitation  and  Development  (COMM)

$74,000 COMM_Key

Allegheny Tarentum  Borough Riverview  Park  Playground

BRC-­‐SC-­‐9-­‐205

$38,200 $38,000 9 Small  Communities/Small  Projects  (COMM)

$68,800 COMM_Key

Allegheny The  Horticultural  Society  of  Western  Pennsylvania  

Forest  Biodiversity  Enhancement

BRC-­‐RCI-­‐11-­‐14

$26,400 $26,000 11 Implementation  (RIV)

$52,900 RIVER_Key

Allegheny Turtle  Creek  Valley  COG  

Joint  Recreation  Feasibility  Study

BRC-­‐TAG-­‐8-­‐194

$10,000 $10,000 8 Feasibility  Studies  (COMM)

$20,000 COMM_Key

Allegheny Twin  Rivers  Council  of  Governments  

Conduit  Grant BRC-­‐PRD-­‐8-­‐195

$85,000 $85,000 8 Park  Rehabilitation  and  Development  (COMM)

$85,000 COMM_Key

Allegheny Twin  Rivers  Council  of  Governments  

Eleven  Sites KEY-­‐PRD-­‐4-­‐154

$170,330 $100,000 4 Park  Rehabilitation  and  Development  (COMM)

$615,287 COMM_Key

Allegheny Twin  Rivers  Council  of  Governments  

Playground  Renovations  -­‐  18  sites

KEY-­‐PRD-­‐1-­‐138

$122,235 $100,000 1 Park  Rehabilitation  and  Development  (COMM)

$244,471 COMM_Key

Page 45: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  45  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Allegheny Urban  Redevelopment  Authority  of  Pittsburgh  

Armstrong  Lofts  Riverbank  Stabilization

BRC-­‐PRD-­‐12-­‐213

$150,000 $135,000 12 Park  Rehabilitation  and  Development  (COMM)

$650,000 COMM_Key

Allegheny Urban  Redevelopment  Authority  of  Pittsburgh  

Hot  Metal  Bridge BRC-­‐RTD-­‐10-­‐14

$931,000 $681,000 10 Rail  Rehabilitation  and  Development  (RT)

$1,862,000 COMM_Key

Allegheny Urban  Redevelopment  Authority  of  Pittsburgh  

South  Shore  Riverfront  Park

BRC-­‐PRD-­‐11.5-­‐35

$350,000 $200,000 11.5 Park  Rehabilitation  and  Development  (COMM)

$700,000 COMM_Key

Allegheny Urban  Redevelopment  Authority  of  Pittsburgh  

South  Shore  Riverfront  Park

BRC-­‐PRD-­‐13-­‐151

$1,000,000 $300,000 13 Park  Rehabilitation  and  Development  (COMM)

$4,200,000 COMM_Key

Allegheny Urban  Redevelopment  Authority  of  Pittsburgh  

South  Shore  Riverfront  Park

BRC-­‐PRD-­‐13.3-­‐440

$500,000 $500,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$4,199,900 COMM_Key

Allegheny Urban  Redevelopment  Authority  of  Pittsburgh  

Tunnel  Park  -­‐  Phase  2

BRC-­‐PRD-­‐11-­‐95

$301,800 $200,000 11 Park  Rehabilitation  and  Development  (COMM)

$603,500 COMM_Key

Page 46: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  46  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Allegheny Versailles  Borough First  Street  and  High  Street  Playgrounds

BRC-­‐SC-­‐7-­‐198

$20,000 $20,000 7 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Allegheny West  Deer  Township American  Legion  Land  Acquisition  -­‐  (Curtisville  Park)

BRC-­‐ACQ-­‐13.3-­‐286

$36,500 $36,500 13.3 Acquisition  (COMM)

$73,000 COMM_Key

Allegheny West  Deer  Township Bairdford  Park/Nike  Site  Master  Park  Plan

BRC-­‐TAG-­‐17-­‐27

$19,500 $19,500 17 Master  Site  Plans  (COMM)

$39,000 COMM_Key

Allegheny West  Deer  Township Comprehensive  Recreation,  Park  &  Open  Space  Plan

BRC-­‐TAG-­‐9-­‐227

$20,000 $20,000 9 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$40,000 COMM_Key

Allegheny West Deer Township Nike Park Development

BRC-PRD-19-124

$700,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)

$1,400,000.00 COMM_Key

Allegheny West Deer Township Nike Park Development

BRC-PRD-19-124

$700,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)

$1,400,000.00 COMM_Key

Allegheny West Deer Township Nike Park Development

BRC-PRD-19-124

$700,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)

$1,400,000.00 COMM_Key

Page 47: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  47  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Allegheny West  Deer  Township Two  Sites KEY-­‐PRD-­‐5-­‐221

$61,750 $60,000 5 Park  Rehabilitation  and  Development  (COMM)

$123,500 COMM_Key

Allegheny West  Mifflin  Borough

Lafarge  Park  1-­‐Development

BRC-­‐PRD-­‐16-­‐166

$212,300 $154,000 16 Park  Rehabilitation  and  Development  (COMM)

$466,518 COMM_Key

Allegheny West  View  Borough Perry  Highway  and  Glenmore  Avenue  Parkle

KEY-­‐PRD-­‐3-­‐236

$120,000 $120,000 3 Park  Rehabilitation  and  Development  (COMM)

$240,000 COMM_Key

Allegheny Western  Pennsylvania  Coalition  for  Abandoned  Mine  Reclamation.  

Bull  Creek KEY-­‐CHP-­‐2-­‐9

$5,000 $5,000 5 Coldwater  Heritage  Partnership

$5,000 RIVER_Key

Allegheny Western  Pennsylvania  Conservancy  

Connoquenessing  Creek  Watershed  Conservation  Plan

BRC-­‐RCP-­‐11-­‐16

$160,500 $115,000 11 Planning  (RIV) $327,500 RIVER_Key

Allegheny White  Oak  Borough Larry  Bishop  Park BRC-­‐PRD-­‐11-­‐100

$63,000 $63,000 11 Park  Rehabilitation  and  Development  (COMM)

$126,200 COMM_Key

Page 48: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  48  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Allegheny Wilkinsburg  Borough Comp.  Recreation,  Park  &  Open  Space  Plan

KEY-­‐TAG-­‐5-­‐227

$25,000 $25,000 5 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$50,000 COMM_Key

Allegheny Zoological  Society  of  Pittsburgh  

African  Wild  Dog  Exhibit

BRC-­‐PRD-­‐12-­‐221

$80,000 $80,000 12 Park  Rehabilitation  and  Development  (COMM)

$166,000 COMM_Key

Allegheny Zoological  Society  of  Pittsburgh  

Children's  Zoo KEY-­‐ZOO-­‐94-­‐6

$1,000,000 $1,000,000 1 Zoo $2,000,000 COMM_Key

Allegheny,  Beaver,  Washington

Washington  County  Conservation  District  

Raccoon  Creek  Watershed  Conservation  Plan

BRC-­‐RCP-­‐17-­‐163

$89,778 $89,800 17 Planning  (RIV) $205,276 RIVER_Key

Allegheny, Westmoreland

Westmoreland County Turtle Creek Railroad Corridor - Acquisition

BRC-RTA-19-161

$457,000.00 $457,000.00 19 Acquisition (RT)

$914,000.00 COMM_Key

Allegheny, Westmoreland

Westmoreland County Turtle Creek Railroad Corridor - Acquisition

BRC-RTA-19-161

$457,000.00 $457,000.00 19 Acquisition (RT)

$914,000.00 COMM_Key

Allegheny, Westmoreland

Westmoreland County Turtle Creek Railroad Corridor - Acquisition

BRC-RTA-19-161

$457,000.00 $457,000.00 19 Acquisition (RT)

$914,000.00 COMM_Key

Allegheny, Westmoreland

Westmoreland County Turtle Creek Railroad Corridor - Acquisition

BRC-RTA-19-161

$457,000.00 $457,000.00 19 Acquisition (RT)

$914,000.00 COMM_Key

Allegheny, Westmoreland

Westmoreland County Turtle Creek Railroad Corridor - Acquisition

BRC-RTA-19-161

$457,000.00 $457,000.00 19 Acquisition (RT)

$914,000.00 COMM_Key

Allegheny, Westmoreland

Westmoreland County Turtle Creek Railroad Corridor - Acquisition

BRC-RTA-19-161

$457,000.00 $457,000.00 19 Acquisition (RT)

$914,000.00 COMM_Key

Allegheny, Westmoreland

Westmoreland County Turtle Creek Railroad Corridor - Acquisition

BRC-RTA-19-161

$457,000.00 $457,000.00 19 Acquisition (RT)

$914,000.00 COMM_Key

Allegheny, Westmoreland

Westmoreland County Turtle Creek Railroad Corridor - Acquisition

BRC-RTA-19-161

$457,000.00 $457,000.00 19 Acquisition (RT)

$914,000.00 COMM_Key

Armstrong Allegheny  Valley  Land  Trust  

Armstrong  Rail-­‐Trail BRC-­‐RTP-­‐8-­‐2

$28,800 $28,000 8 Master  Plans  (RT)

$57,600 RT_Key

Page 49: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  49  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Armstrong Allegheny  Valley  Land  Trust  

Armstrong  Trail  -­‐  Mahoning  North  Development

BRC-­‐RTD-­‐12-­‐4

$50,100 $50,100 12 Rail  Rehabilitation  and  Development  (RT)

$100,200 RT_Key

Armstrong Allegheny  Valley  Land  Trust  

Armstrong  Trail-­‐Scheeren/Templeton  Sections

KEY-­‐RTD-­‐4-­‐2

$25,750 $25,750 4 Rail  Rehabilitation  and  Development  (RT)

$51,500 RT_Key

Armstrong Apollo  Borough Apollo  Borough  Park BRC-­‐SC-­‐7-­‐10

$25,000 $25,000 7 Small  Communities/Small  Projects  (COMM)

$30,000 COMM_Key

Armstrong Applewold  Borough Walking/Jogging  Track  &  Shelter

BRC-­‐SC-­‐7-­‐11

$20,000 $20,000 7 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Armstrong Armstrong  County Armstrong  County  OHV  Park  Acquisition

BRC-­‐S/ATV-­‐17-­‐62

$824,990 $234,400 17 Snowmobile/ATV_Acquisition

$1,649,980 COMM_Key

Armstrong Armstrong  County Belmont  Complex BRC-­‐PRD-­‐14-­‐111

$350,000 $350,000 14 Park  Rehabilitation  and  Development  (COMM)

$700,000 COMM_Key

Armstrong Armstrong  County Belmont  Complex BRC-­‐PRD-­‐7-­‐13

$28,730 $28,000 7 Park  Rehabilitation  and  Development  (COMM)

$57,460 COMM_Key

Page 50: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  50  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Armstrong Armstrong  County Belmont  Complex KEY-­‐PRD-­‐1-­‐4

$150,000 $100,000 1 Park  Rehabilitation  and  Development  (COMM)

$302,700 COMM_Key

Armstrong Armstrong  County Belmont  Complex  Feasibility  Study

BRC-­‐TAG-­‐11-­‐191

$24,700 $24,700 11 Feasibility  Studies  (COMM)

$49,400 COMM_Key

Armstrong Armstrong  County Buttermilk  Falls  Trail BRC-­‐PRD-­‐10-­‐109

$140,343 $100,000 10 Park  Rehabilitation  and  Development  (COMM)

$1,471,683 COMM_Key

Armstrong Armstrong  County Peer-­‐to-­‐Peer KEY-­‐TAG-­‐5-­‐1

$6,300 $6,300 5 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$7,000 COMM_Key

Armstrong Armstrong  County Recreation,  Park,  Open  Space  and  Greenway  Plan

BRC-­‐TAG-­‐12-­‐222

$70,000 $50,000 12 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$140,000 COMM_Key

Armstrong Armstrong  County  Conservancy  Charitable  Trust  

Heasley  Properties KEY-­‐RTA-­‐4-­‐4

$20,000 $20,000 4 Acquisition  (RT) $40,000 RT_Key

Armstrong Armstrong  County  Conservancy  Charitable  Trust  

Minteer  Limestone  Spring  Acquisition

BRC-­‐LTA-­‐8-­‐2

$33,000 $30,000 8 Critical  Habitat  Acquisition  (LT)

$66,000 LT_Key

Armstrong Cadogan  Township Community  Park KEY-­‐SC-­‐1-­‐26 $20,000 $20,000 1 Small  Communities/Small  Projects  (COMM)

$20,750 COMM_Key

Page 51: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  51  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Armstrong Cowanshannock  Creek  Watershed  Association  

Cowanshannock  Creek  Watershed  Plan

BRC-­‐RCP-­‐6-­‐20

$30,000 $30,000 6 Planning  (RIV) $60,000 RIVER_Key

Armstrong Cowanshannock  Township

Sagamore  Playground

KEY-­‐SC-­‐3-­‐42 $20,000 $20,000 3 Small  Communities/Small  Projects  (COMM)

$23,000 COMM_Key

Armstrong Dayton  Borough Community  Park BRC-­‐SC-­‐9-­‐60

$23,800 $23,000 9 Small  Communities/Small  Projects  (COMM)

$27,200 COMM_Key

Armstrong East  Franklin  Township

Armstrong  Heritage  Park

KEY-­‐PRD-­‐5-­‐56

$40,000 $40,000 5 Park  Rehabilitation  and  Development  (COMM)

$80,000 COMM_Key

Armstrong East  Franklin  Township

West  Hills  Community  Park  -­‐  Development

BRC-­‐PRD-­‐17-­‐115

$25,113 $25,100 17 Park  Rehabilitation  and  Development  (COMM)

$50,798 COMM_Key

Armstrong Elderton  Borough Elderton/Plumcreek  Park

BRC-­‐SC-­‐10-­‐76

$33,000 $30,000 10 Small  Communities/Small  Projects  (COMM)

$46,000 COMM_Key

Armstrong Ford  City  Borough Armstrong  Trail BRC-­‐RTD-­‐7-­‐5

$40,000 $40,000 7 Rail  Rehabilitation  and  Development  (RT)

$80,000 RT_Key

Page 52: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  52  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Armstrong Ford  City  Borough Armstrong  Trail  14th  St  to  McCain  Street  -­‐  Development

BRC-­‐PRD-­‐18-­‐71

$34,195 $34,200 18 Park  Rehabilitation  and  Development  (COMM)

$73,455 COMM_Key

Armstrong Ford  City  Borough Joe  Malec  Memorial  Park

BRC-­‐SC-­‐6-­‐65

$20,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$20,500 COMM_Key

Armstrong Ford  City  Borough Riverfront  Park  Development

BRC-­‐PRD-­‐11-­‐35

$223,400 $150,000 11 Park  Rehabilitation  and  Development  (COMM)

$446,800 COMM_Key

Armstrong Ford  City  Borough Riverside  Master  Plan

BRC-­‐TAG-­‐9-­‐77

$15,000 $15,000 9 Master  Site  Plans  (COMM)

$30,000 COMM_Key

Armstrong Freeport  Borough Borough  Park BRC-­‐SC-­‐6-­‐72

$20,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$26,275 COMM_Key

Armstrong Freeport  Borough Butler  to  Freeport  Trail  Extension  Project

BRC-­‐RTD-­‐9-­‐5

$324,000 $140,000 9 Rail  Rehabilitation  and  Development  (RT)

$648,000 RT_Key

Armstrong Freeport  Borough Freeport  Riverside  Park

KEY-­‐SC-­‐3-­‐72 $20,000 $20,000 3 Small  Communities/Small  Projects  (COMM)

$22,500 COMM_Key

Page 53: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  53  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Armstrong Freeport  Borough Freeport  Trail  -­‐  Hurricane  Damage

BRC-­‐RTD-­‐11-­‐5

$65,000 $65,000 11 Rail  Rehabilitation  and  Development  (RT)

$130,000 COMM_Key

Armstrong Freeport  Borough Peer-­‐  to-­‐  Peer KEY-­‐TAG-­‐5-­‐2

$7,500 $7,500 5 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$8,250 COMM_Key

Armstrong Gilpin  Township Gilpin-­‐Leechburg  Park

BRC-­‐SC-­‐8-­‐76

$28,000 $28,000 8 Small  Communities/Small  Projects  (COMM)

$42,500 COMM_Key

Armstrong Kittanning  Borough Armstrong  Trail  -­‐  North  of  Chestnut  Street  -­‐  Development

BRC-­‐PRD-­‐18-­‐174

$55,652 $55,600 18 Park  Rehabilitation  and  Development  (COMM)

$122,999 COMM_Key

Armstrong Kittanning  Borough Armstrong  Trail  Enhancement/Safe  Route  to  School

BRC-­‐PRD-­‐12-­‐162

$16,000 $16,000 12 Park  Rehabilitation  and  Development  (COMM)

$232,000 COMM_Key

Armstrong Kittanning Borough Armstrong Trail-Development

BRC-SC-19-43

$36,082.00 $36,000.00 19 Small Communities/Small Projects (COMM)

$59,882.00 COMM_Key

Armstrong Kittanning Borough Armstrong Trail-Development

BRC-SC-19-43

$36,082.00 $36,000.00 19 Small Communities/Small Projects (COMM)

$59,882.00 COMM_Key

Page 54: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  54  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Armstrong Kittanning Borough Armstrong Trail-Development

BRC-SC-19-43

$36,082.00 $36,000.00 19 Small Communities/Small Projects (COMM)

$59,882.00 COMM_Key

Armstrong Kittanning  Borough Community  Park BRC-­‐SC-­‐8-­‐100

$40,000 $40,000 8 Small  Communities/Small  Projects  (COMM)

$99,500 COMM_Key

Armstrong Kittanning  Borough John  Whelan  Memorial  Playground

BRC-­‐PRD-­‐9-­‐109

$40,000 $40,000 9 Park  Rehabilitation  and  Development  (COMM)

$112,600 COMM_Key

Armstrong Kittanning  Borough Kittanning  Trail BRC-­‐RTD-­‐6-­‐14

$40,000 $190,000 6 Rail  Rehabilitation  and  Development  (RT)

$730,000 RT_Key

Armstrong Kittanning  Township Community  Park BRC-­‐SC-­‐13-­‐308

$29,200 $20,000 13 Small  Communities/Small  Projects  (COMM)

$36,300 COMM_Key

Armstrong Kittanning  Township Community  Park BRC-­‐SC-­‐6-­‐89

$20,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$21,000 COMM_Key

Armstrong Kittanning  Township Community  Park KEY-­‐SC-­‐4-­‐75 $20,000 $20,000 4 Small  Communities/Small  Projects  (COMM)

$21,000 COMM_Key

Page 55: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  55  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Armstrong Kittanning  Township Kittanning  Township  Community  Park

BRC-­‐SC-­‐7-­‐95

$33,500 $33,000 7 Small  Communities/Small  Projects  (COMM)

$46,935 COMM_Key

Armstrong Leechburg  Borough Campbell  Avenue  Playground

BRC-­‐SC-­‐12-­‐104

$25,000 $26,000 12 Small  Communities/Small  Projects  (COMM)

$31,000 COMM_Key

Armstrong Leechburg  Borough Riverfront  Park KEY-­‐SC-­‐3-­‐113

$20,000 $20,000 3 Small  Communities/Small  Projects  (COMM)

$22,500 COMM_Key

Armstrong Madison  Township Community  Park KEY-­‐SC-­‐2-­‐90 $20,000 $20,000 2 Small  Communities/Small  Projects  (COMM)

$22,000 COMM_Key

Armstrong Parker  City Phillips  Municipal  Park

BRC-­‐SC-­‐6-­‐136

$20,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$23,000 COMM_Key

Armstrong Parker  City Phillips  Municipal  Park

BRC-­‐SC-­‐7-­‐146

$36,000 $36,000 7 Small  Communities/Small  Projects  (COMM)

$56,000 COMM_Key

Armstrong Parker  City River  Avenue  Boat  Launch  Area

BRC-­‐PRD-­‐14-­‐161

$12,700 $22,700 14 Park  Rehabilitation  and  Development  (COMM)

$50,600 COMM_Key

Page 56: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  56  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Armstrong Parks  Township Kiskimere  and  Knepple  Hill  Parks

BRC-­‐SC-­‐11-­‐145

$40,000 $40,000 11 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Armstrong Parks  Township North  Vandergrift  Park

BRC-­‐SC-­‐7-­‐148

$20,000 $20,000 7 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Armstrong Pine  Township Templeton  Community  Park-­‐  Development

BRC-­‐SC-­‐18-­‐37

$31,878 $31,800 18 Small  Communities/Small  Projects  (COMM)

$51,216 COMM_Key

Armstrong Redbank  Township Master  Site  Plan BRC-­‐TAG-­‐10-­‐167

$6,500 $6,500 10 Master  Site  Plans  (COMM)

$13,000 COMM_Key

Armstrong Roaring  Run  Watershed  Association  

Kiski  Realty  Company  Property  Acquisition

BRC-­‐RTA-­‐8-­‐14

$65,700 $65,000 8 Acquisition  (RT) $155,400 RT_Key

Armstrong Roaring  Run  Watershed  Association  

Kiski  Realty  Property KEY-­‐LTA-­‐1-­‐11

$62,500 $50,000 1 Open  Space  Acquisition  (LT)

$125,000 LT_Key

Armstrong Roaring  Run  Watershed  Association  

Roaring  Run  Trail  -­‐  Phase  3

KEY-­‐RTD-­‐3-­‐19

$8,900 $8,900 3 Rail  Rehabilitation  and  Development  (RT)

$17,800 RT_Key

Armstrong Roaring  Run  Watershed  Association  

Roaring  Run  Trail  -­‐  Phase  4

BRC-­‐RTD-­‐12-­‐13

$84,000 $84,000 12 Rail  Rehabilitation  and  Development  (RT)

$474,600 RT_Key

Page 57: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  57  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Armstrong Rural  Valley  Borough Shannock  Valley  Community  Park

BRC-­‐SC-­‐14-­‐104

$30,500 $30,500 14 Small  Communities/Small  Projects  (COMM)

$41,275 COMM_Key

Armstrong Rural  Valley  Borough Shannock  Valley  Community  Park

BRC-­‐SC-­‐8-­‐163

$27,000 $27,000 8 Small  Communities/Small  Projects  (COMM)

$34,000 COMM_Key

Armstrong Washington  Township

Memorial  Park  -­‐  Development

BRC-­‐SC-­‐17-­‐49

$26,396 $26,400 17 Small  Communities/Small  Projects  (COMM)

$32,793 COMM_Key

Armstrong West  Kittanning  Borough

West  Kittanning  Park BRC-­‐SC-­‐14-­‐108

$34,300 $34,300 14 Small  Communities/Small  Projects  (COMM)

$49,900 COMM_Key

Armstrong Worthington  Borough

Worthington  Borough  Playground

BRC-­‐SC-­‐7-­‐214

$24,000 $24,000 7 Small  Communities/Small  Projects  (COMM)

$28,017 COMM_Key

Armstrong,  Butler

Audubon  Society  of  Western  Pennsylvania  

Buffalo  Creek  Watershed  Conservation  Plan

BRC-­‐RCP-­‐11-­‐1

$60,000 $50,000 11 Planning  (RIV) $120,000 RIVER_Key

Armstrong,  Cambria,  Indiana,  Somerset,  Westmoreland

Allegheny  Ridge  Corporation  

Kiski-­‐Conemaugh  Basin  Water  Trail  Mapping

BRC-­‐RCI-­‐13.3-­‐505

$20,000 $20,000 13.3 Implementation  (RIV)

$59,200 RIVER_Key

Page 58: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  58  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Beaver Aliquippa  City Comp.  Recreation,  Park  &  Open  Space  Plan

KEY-­‐TAG-­‐4-­‐8

$10,000 $10,000 4 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$20,000 COMM_Key

Beaver Aliquippa  City Ravine  Park BRC-­‐PRD-­‐13-­‐330

$30,000 $30,000 13 Park  Rehabilitation  and  Development  (COMM)

$60,000 COMM_Key

Beaver Aliquippa  City Recreation  Upgrades  -­‐  Master  Site  Plans

BRC-­‐TAG-­‐10-­‐145

$36,300 $36,000 10 Master  Site  Plans  (COMM)

$72,500 COMM_Key

Beaver Aliquippa  City Trail  Feasibility  Study BRC-­‐TAG-­‐14-­‐189

$20,000 $20,000 14 Feasibility  Studies  (COMM)

$40,000 COMM_Key

Beaver Ambridge  Borough Walter  Panek  Park  Planning  Study

BRC-­‐TAG-­‐13-­‐177

$17,500 $17,500 13 Master  Site  Plans  (COMM)

$35,000 COMM_Key

Beaver Ambridge  Borough Walter  Panek  Park-­‐  Development

BRC-­‐PRD-­‐18-­‐46

$30,400 $30,400 18 Park  Rehabilitation  and  Development  (COMM)

$60,800 COMM_Key

Beaver Beaver  Borough Indoor  Recreation  Center  Feasibility  Study

BRC-­‐TAG-­‐13.3-­‐457

$31,500 $31,500 13.3 Feasibility  Studies  (COMM)

$63,000 COMM_Key

Beaver Beaver  County Brady's  Run  County  Park

BRC-­‐PRD-­‐9-­‐15

$80,000 $80,000 9 Park  Rehabilitation  and  Development  (COMM)

$160,000 COMM_Key

Page 59: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  59  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Beaver Beaver  County Bradys  Run  Park  -­‐  Development

BRC-­‐PRD-­‐17-­‐103

$250,000 $250,000 17 Park  Rehabilitation  and  Development  (COMM)

$500,000 COMM_Key

Beaver Beaver  County Bradys  Run  Park-­‐  Development

BRC-­‐PRD-­‐18-­‐47

$180,000 $180,000 18 Park  Rehabilitation  and  Development  (COMM)

$360,000 COMM_Key

Beaver Beaver  County Buttermilk  Falls KEY-­‐PRD-­‐3-­‐12

$50,000 $50,000 3 Park  Rehabilitation  and  Development  (COMM)

$100,000 COMM_Key

Beaver Beaver  County Comp.  Park,  Recreation  and  Open  Space  Plan

BRC-­‐TAG-­‐6-­‐17

$32,500 $32,500 6 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$65,000 COMM_Key

Beaver Beaver  County Greenways  &  Trails  Plan

BRC-­‐TAG-­‐9-­‐16

$25,000 $25,000 9 Greenway  Plans  (COMM)

$50,000 COMM_Key

Beaver Beaver  County Master  Site  Development  Plan

KEY-­‐TAG-­‐3-­‐13

$20,000 $20,000 3 Master  Site  Plans  (COMM)

$40,000 COMM_Key

Beaver Beaver  County Master  Site  Plans-­‐Three  Parks

BRC-­‐TAG-­‐10-­‐146

$75,000 $75,000 10 Master  Site  Plans  (COMM)

$150,000 COMM_Key

Beaver Beaver  Falls  City Pool  Feasibility  Study BRC-­‐TAG-­‐12-­‐223

$10,000 $10,000 12 Feasibility  Studies  (COMM)

$20,000 COMM_Key

Page 60: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  60  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Beaver Beaver  Valley  Council  of  Governments  

Peer-­‐to-­‐Peer KEY-­‐TAG-­‐3-­‐1

$7,500 $7,500 3 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$8,250 COMM_Key

Beaver Big  Beaver  Borough Big  Beaver  Borough  Municipal  Park

BRC-­‐TAG-­‐7-­‐20

$10,000 $10,000 7 Master  Site  Plans  (COMM)

$20,000 COMM_Key

Beaver Bridgewater  Borough

Bicentennial  Park KEY-­‐PRD-­‐2-­‐18

$100,000 $100,000 2 Park  Rehabilitation  and  Development  (COMM)

$200,000 COMM_Key

Beaver Bridgewater  Borough

Bridgewater  Trail  North

BRC-­‐PRD-­‐13-­‐92

$350,000 $200,000 13 Park  Rehabilitation  and  Development  (COMM)

$1,046,700 COMM_Key

Beaver Brighton  Township CAMBEV  Property  Master  Site  Plan

BRC-­‐TAG-­‐10-­‐147

$10,000 $10,000 10 Master  Site  Plans  (COMM)

$20,000 COMM_Key

Beaver Brighton  Township Commuter  Bicycle  Lanes

BRC-­‐PRD-­‐12-­‐273

$100,000 $100,000 12 Park  Rehabilitation  and  Development  (COMM)

$390,400 COMM_Key

Beaver Brighton  Township Dawson  Ridge  Park KEY-­‐PRD-­‐3-­‐22

$15,000 $15,000 3 Park  Rehabilitation  and  Development  (COMM)

$34,700 COMM_Key

Beaver Brighton  Township Feasibility  Study BRC-­‐TAG-­‐6-­‐23

$20,000 $20,000 6 Feasibility  Studies  (COMM)

$40,000 COMM_Key

Page 61: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  61  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Beaver Brighton Township Greenways and Trails Network Plan

BRC-TAG-19-128

$16,225.00 $16,200.00 19 Greenway Plans (COMM)

$32,450.00 COMM_Key

Beaver Brighton Township Greenways and Trails Network Plan

BRC-TAG-19-128

$16,225.00 $16,200.00 19 Greenway Plans (COMM)

$32,450.00 COMM_Key

Beaver Brighton Township Greenways and Trails Network Plan

BRC-TAG-19-128

$16,225.00 $16,200.00 19 Greenway Plans (COMM)

$32,450.00 COMM_Key

Beaver Brighton  Township Hardy  Field  -­‐  Development

BRC-­‐PRD-­‐17-­‐108

$100,000 $100,000 17 Park  Rehabilitation  and  Development  (COMM)

$205,668 COMM_Key

Beaver Brighton  Township Novakovic  Property KEY-­‐ACQ-­‐5-­‐23

$30,150 $30,000 5 Acquisition  (COMM)

$60,309 COMM_Key

Beaver Brighton  Township Rural  Pedestrian  Trail

BRC-­‐PRD-­‐7-­‐25

$29,450 $29,000 7 Park  Rehabilitation  and  Development  (COMM)

$58,981 COMM_Key

Beaver Brighton  Township Two  Mile  Run  Park BRC-­‐PRD-­‐11-­‐10

$78,000 $78,000 11 Park  Rehabilitation  and  Development  (COMM)

$156,000 COMM_Key

Beaver Brighton  Township Yurfick  Property  Acquisition

BRC-­‐ACQ-­‐13.6-­‐578

$33,600 $33,600 13.6 Acquisition  (COMM)

$67,200 COMM_Key

Beaver Center  Township Safe  Routes  to  School

BRC-­‐TAG-­‐11-­‐196

$15,000 $15,000 11 Trail  Study  (COMM)

$30,000 COMM_Key

Beaver Chippewa  Township Blackhawk  Soccer  Fields

KEY-­‐PRD-­‐5-­‐34

$90,813 $70,000 5 Park  Rehabilitation  and  Development  (COMM)

$181,625 COMM_Key

Page 62: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  62  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Beaver Chippewa  Township Comprehensive  Regional  Rec.  &  Park  Plan

BRC-­‐TAG-­‐9-­‐48

$25,000 $25,000 9 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$50,000 COMM_Key

Beaver Chippewa  Township Labate  Property  Acquisition

BRC-­‐ACQ-­‐13.3-­‐274

$350,000 $350,000 13.3 Acquisition  (COMM)

$1,400,000 COMM_Key

Beaver Chippewa  Township McKinley  Park  -­‐  Phase  I-­‐Development

BRC-­‐PRD-­‐15-­‐54

$231,468 $125,900 15 Park  Rehabilitation  and  Development  (COMM)

$462,936 COMM_Key

Beaver Conway  Borough Buttermore  Park KEY-­‐SC-­‐5-­‐38 $20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$21,700 COMM_Key

Beaver Conway  Borough Gratty  Park  Playground

BRC-­‐PRD-­‐9-­‐57

$54,000 $54,000 9 Park  Rehabilitation  and  Development  (COMM)

$108,000 COMM_Key

Beaver Darlington  Township Township  Muncipal  Park

BRC-­‐TAG-­‐7-­‐48

$12,750 $12,500 7 Master  Site  Plans  (COMM)

$25,500 COMM_Key

Beaver East  Rochester  Borough

Fifth  Street  Playground

KEY-­‐SC-­‐4-­‐50 $20,000 $20,000 4 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Beaver Economy  Borough Economy  Borough  Master  Plans

BRC-­‐TAG-­‐7-­‐63

$35,000 $15,000 7 Master  Site  Plans  (COMM)

$70,000 COMM_Key

Page 63: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  63  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Beaver Economy  Borough Recreation  Park  Phase  I  -­‐  Playground

BRC-­‐PRD-­‐9-­‐71

$49,800 $49,000 9 Park  Rehabilitation  and  Development  (COMM)

$165,900 COMM_Key

Beaver Franklin  Township Franklin  Park BRC-­‐PRD-­‐8-­‐72

$66,000 $66,000 8 Park  Rehabilitation  and  Development  (COMM)

$241,700 COMM_Key

Beaver Franklin  Township Franklin  Park BRC-­‐PRD-­‐9-­‐80

$80,000 $80,000 9 Park  Rehabilitation  and  Development  (COMM)

$173,000 COMM_Key

Beaver Greene  Township Mateer  Property BRC-­‐ACQ-­‐6-­‐76

$50,000 $50,000 6 Acquisition  (COMM)

$101,970 COMM_Key

Beaver Greene  Township Reg.  Comp.  Recreation  Plan

BRC-­‐TAG-­‐8-­‐78

$20,000 $20,000 8 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$40,000 COMM_Key

Beaver Hopewell  Township Hopewell  Community  Park-­‐Development

BRC-­‐PRD-­‐18-­‐73

$87,925 $87,000 18 Park  Rehabilitation  and  Development  (COMM)

$175,850 COMM_Key

Beaver Hopewell  Township Hopewell  Township  Park

BRC-­‐TAG-­‐7-­‐85

$10,000 $10,000 7 Master  Site  Plans  (COMM)

$20,000 COMM_Key

Beaver Hopewell  Township Nemtz/  Agresti  Land  Acquisition

BRC-­‐ACQ-­‐13-­‐227

$72,500 $71,000 13 Acquisition  (COMM)

$145,100 COMM_Key

Page 64: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  64  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Beaver Hopewell  Township Youth  Baseball  Complex

BRC-­‐PRD-­‐13-­‐109

$100,000 $100,000 13 Park  Rehabilitation  and  Development  (COMM)

$200,000 COMM_Key

Beaver Independence  Township

Community  Park  -­‐  Phase  I

BRC-­‐PRD-­‐10-­‐120

$95,300 $50,000 10 Park  Rehabilitation  and  Development  (COMM)

$170,600 COMM_Key

Beaver Independence  Township

Municipal  Park  Master  Plan

BRC-­‐TAG-­‐7-­‐90

$11,000 $11,000 7 Master  Site  Plans  (COMM)

$22,000 COMM_Key

Beaver Industry  Borough Community  Park BRC-­‐SC-­‐8-­‐90

$20,000 $20,000 8 Small  Communities/Small  Projects  (COMM)

$21,000 COMM_Key

Beaver Industry  Borough Community  Park KEY-­‐SC-­‐3-­‐96 $20,000 $20,000 3 Small  Communities/Small  Projects  (COMM)

$32,000 COMM_Key

Beaver Midland  Borough Midland  Recreation  Complex

BRC-­‐PRD-­‐11-­‐56

$97,800 $97,800 11 Park  Rehabilitation  and  Development  (COMM)

$195,600 COMM_Key

Beaver Midland  Borough Ohio  River  Trail  -­‐  North  Shore  Trail  Feasibility  Study

BRC-­‐TAG-­‐16-­‐64

$29,000 $29,000 16 Trail  Study  (COMM)

$58,000 COMM_Key

Page 65: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  65  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Beaver Monaca  Borough 15th  Street  Playground

BRC-­‐PRD-­‐6-­‐115

$25,575 $25,000 6 Park  Rehabilitation  and  Development  (COMM)

$51,150 COMM_Key

Beaver Monaca Borough John A. Antoline Park- Phase-1-Development

BRC-PRD-19-98

$150,000.00 $150,000.00 19 Park Rehabilitation and Development (COMM)

$300,000.00 COMM_Key

Beaver Monaca Borough John A. Antoline Park- Phase-1-Development

BRC-PRD-19-98

$150,000.00 $150,000.00 19 Park Rehabilitation and Development (COMM)

$300,000.00 COMM_Key

Beaver Monaca Borough John A. Antoline Park- Phase-1-Development

BRC-PRD-19-98

$150,000.00 $150,000.00 19 Park Rehabilitation and Development (COMM)

$300,000.00 COMM_Key

Beaver Monaca  Borough Riverfront  Park BRC-­‐PRD-­‐13-­‐126

$345,000 $200,000 13 Park  Rehabilitation  and  Development  (COMM)

$691,200 COMM_Key

Beaver Monaca  Borough Riverfront  Park KEY-­‐PRD-­‐1-­‐86

$150,000 $100,000 1 Park  Rehabilitation  and  Development  (COMM)

$300,000 COMM_Key

Page 66: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  66  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Beaver New  Brighton  Area  Recreation  Commission  

New  Brighton  Memorial  Field-­‐Development

BRC-­‐PRD-­‐15-­‐62

$120,000 $166,100 15 Park  Rehabilitation  and  Development  (COMM)

$245,000 COMM_Key

Beaver New  Brighton  Borough

Riverfront  Park KEY-­‐ACQ-­‐5-­‐143

$15,000 $15,000 5 Acquisition  (COMM)

$30,000 COMM_Key

Beaver New  Galilee  Borough

New  Galilee  Borough  Park

BRC-­‐SC-­‐8-­‐129

$20,000 $23,000 8 Small  Communities/Small  Projects  (COMM)

$26,200 COMM_Key

Beaver New  Sewickley  Township

Green  Valley  Park BRC-­‐PRD-­‐11-­‐60

$17,300 $17,300 11 Park  Rehabilitation  and  Development  (COMM)

$34,600 COMM_Key

Beaver North  Sewickley  Township

Bradshaw  Park BRC-­‐PRD-­‐8-­‐137

$96,000 $96,000 8 Park  Rehabilitation  and  Development  (COMM)

$537,400 COMM_Key

Beaver Patterson  Heights  Borough

Patterson  Heights  Park

BRC-­‐SC-­‐14-­‐98

$21,300 $21,300 14 Small  Communities/Small  Projects  (COMM)

$22,300 COMM_Key

Beaver Patterson  Heights  Borough

Patterson  Heights  Park

KEY-­‐SC-­‐5-­‐155

$20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$42,000 COMM_Key

Beaver Raccoon  Township Raccoon  Township  Municipal  Park

BRC-­‐TAG-­‐7-­‐161

$10,000 $10,000 7 Master  Site  Plans  (COMM)

$20,000 COMM_Key

Page 67: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  67  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Beaver Raccoon  Township Township  Park KEY-­‐SC-­‐4-­‐131

$20,000 $20,000 4 Small  Communities/Small  Projects  (COMM)

$24,543 COMM_Key

Beaver Rochester  Borough Rochester  riverfront  park  Master  Plan

KEY-­‐TAG-­‐5-­‐173

$25,000 $25,000 5 Master  Site  Plans  (COMM)

$50,000 COMM_Key

Beaver Rochester  Township Gallo  Park BRC-­‐SC-­‐14-­‐103

$40,000 $40,000 14 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Beaver South  Beaver  Township

Township  Park BRC-­‐SC-­‐14-­‐105

$28,400 $28,400 14 Small  Communities/Small  Projects  (COMM)

$36,900 COMM_Key

Beaver South  Beaver  Township

Township  Park BRC-­‐SC-­‐6-­‐169

$20,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$24,063 COMM_Key

Beaver South  Heights  Borough

South  Heights  Municipal  Park

BRC-­‐SC-­‐8-­‐180

$20,000 $20,000 8 Small  Communities/Small  Projects  (COMM)

$22,100 COMM_Key

Beaver Vanport  Township Jefferson  Avenue  Playground

KEY-­‐SC-­‐5-­‐208

$20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$32,226 COMM_Key

Beaver White  Township Community  Park-­‐  Phase  1-­‐Development

BRC-­‐SC-­‐16-­‐50

$40,000 $40,000 16 Small  Communities/Small  Projects  (COMM)

$52,878 COMM_Key

Page 68: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  68  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Beaver,  Lawrence

Pennsylvania  Environmental  Council,  Inc.  

Beaver  River  Conservation  Plan

BRC-­‐RCP-­‐10-­‐6

$99,000 $95,000 10 Planning  (RIV) $198,000 RIVER_Key

Bedford Bedford  County Natural  Heritage  Inventory

KEY-­‐TAG-­‐1-­‐9

$29,200 $25,000 1 Natural  Areas  Inventories  (COMM)

$58,400 COMM_Key

Bedford Bedford  County Peer-­‐to-­‐Peer  Study BRC-­‐TAG-­‐16-­‐11

$10,000 $10,000 16 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$15,000 COMM_Key

Bedford Bedford  County  Conservation  District  

Lake  Koon  Development

BRC-­‐PRD-­‐15-­‐50

$46,500 $46,500 15 Park  Rehabilitation  and  Development  (COMM)

$98,000 COMM_Key

Bedford Bedford  Joint  Municipal  Authority  

Bedford  Heritage  Trail  -­‐  Development

BRC-­‐PRD-­‐18-­‐48

$573,629 $453,100 18 Park  Rehabilitation  and  Development  (COMM)

$1,147,258 COMM_Key

Bedford Bedford  Joint  Municipal  Authority  

Bedford  Heritage  Trail  Feasibility  Study

BRC-­‐TAG-­‐17-­‐3

$20,625 $20,600 17 Trail  Study  (COMM)

$41,250 COMM_Key

Bedford Broad  Top  Township Broad  Top  Township  Rail  Trail  Acquisition

BRC-­‐RTA-­‐14-­‐277

$88,800 $78,300 14 Acquisition  (RT) $177,600 COMM_Key

Page 69: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  69  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Bedford Broad  Top  Township Huntingdon  &  Broad  Top  Rail  Trail  -­‐  Phase  2  -­‐  Development

BRC-­‐RTD-­‐18-­‐169

$54,804 $54,800 18 Rail  Rehabilitation  and  Development  (RT)

$109,608 COMM_Key

Bedford Broad Top Township Huntingdon & Broad Top Rail Trail - Phase 2b - Development

$86,406.00 $80,000.00 19 Rail Rehabilitation and Development (RT)

$172,812.00 COMM_Key

Bedford Broad Top Township Huntingdon & Broad Top Rail Trail - Phase 2b - Development

$86,406.00 $80,000.00 19 Rail Rehabilitation and Development (RT)

$172,812.00 COMM_Key

Bedford Broad Top Township Huntingdon & Broad Top Rail Trail - Phase 2b - Development

$86,406.00 $80,000.00 19 Rail Rehabilitation and Development (RT)

$172,812.00 COMM_Key

Bedford Broad  Top  Township Huntington  &  Broad  Top  Rail  Trail  -­‐  Phase  I  Construction

BRC-­‐RTP-­‐16-­‐181

$23,000 $23,000 16 Master  Plans  (RT)

$46,000 COMM_Key

Bedford Broad  Top  Township Riddlesburg  Community  Park

BRC-­‐SC-­‐9-­‐34

$30,200 $30,000 9 Small  Communities/Small  Projects  (COMM)

$40,500 COMM_Key

Bedford Broad  Top  Township Steele  Property  Acquisition  -­‐  (Rail  Trail)

BRC-­‐RTA-­‐13-­‐12

$30,500 $30,000 13 Acquisition  (RT) $61,000 RT_Key

Page 70: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  70  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Bedford Cumberland  Valley  Township

Centerville  Recreational  Park

BRC-­‐PRD-­‐13-­‐100

$79,900 $75,000 13 Park  Rehabilitation  and  Development  (COMM)

$159,800 COMM_Key

Bedford Everett  Borough Tenley  Park  -­‐  Development

BRC-­‐SC-­‐17-­‐35

$30,000 $30,000 17 Small  Communities/Small  Projects  (COMM)

$58,579 COMM_Key

Bedford Hopewell  Borough Community  Park-­‐Development

BRC-­‐SC-­‐15-­‐80

$30,168 $30,000 15 Small  Communities/Small  Projects  (COMM)

$40,337 COMM_Key

Bedford Hyndman  Borough Hyndman  Park BRC-­‐SC-­‐7-­‐89

$29,198 $29,000 7 Small  Communities/Small  Projects  (COMM)

$42,475 COMM_Key

Bedford Hyndman  Borough Hyndman  Park KEY-­‐SC-­‐5-­‐93 $19,234 $19,200 5 Small  Communities/Small  Projects  (COMM)

$38,468 COMM_Key

Bedford Hyndman  Borough Hyndman  Park  -­‐  Development

BRC-­‐SC-­‐16-­‐43

$38,225 $40,000 16 Small  Communities/Small  Projects  (COMM)

$59,245 COMM_Key

Bedford Kimmel  Township Kimmel  Township  Community  Park

BRC-­‐SC-­‐7-­‐94

$18,955 $20,000 7 Small  Communities/Small  Projects  (COMM)

$34,762 COMM_Key

Page 71: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  71  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Bedford Kimmel  Township Queen  Community  Center  Park

BRC-­‐SC-­‐14-­‐92

$26,000 $35,000 14 Small  Communities/Small  Projects  (COMM)

$32,000 COMM_Key

Bedford King  Township Imler  Family  Park BRC-­‐PRD-­‐10-­‐121

$54,243 $50,000 10 Park  Rehabilitation  and  Development  (COMM)

$108,486 COMM_Key

Bedford Liberty  Township Saxton-­‐Liberty  Playground

BRC-­‐SC-­‐9-­‐116

$24,000 $24,000 9 Small  Communities/Small  Projects  (COMM)

$28,000 COMM_Key

Bedford Pleasantville  Borough

Pleasantville  Recreation  Park  Acquisition

BRC-­‐ACQ-­‐11-­‐185

$8,500 $8,500 11 Acquisition  (COMM)

$27,000 COMM_Key

Bedford St.  Clairsville  Borough

Henderson  Park BRC-­‐SC-­‐11-­‐158

$25,700 $25,000 11 Small  Communities/Small  Projects  (COMM)

$31,400 COMM_Key

Bedford The  Conservation  Fund  

Westvaco  Corp.  Property

BRC-­‐LTA-­‐7-­‐19

$70,000 $70,000 7 Open  Space  Acquisition  (LT)

$168,500 LT_Key

Bedford Western  Pennsylvania  Conservancy  

3-­‐Sisters  Watershed  Conservation  Plan

BRC-­‐RCP-­‐9-­‐17

$185,400 $140,000 9 Planning  (RIV) $437,000 RIVER_Key

Bedford Western  Pennsylvania  Conservancy  

Hardwood  Trails  Aquisition

BRC-­‐LTA-­‐17-­‐213

$970,269 $970,000 17 Open  Space  Acquisition  (LT)

$1,940,538 LT_Key

Page 72: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  72  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Bedford Western  Pennsylvania  Conservancy  

Shipley  Tract KEY-­‐LTA-­‐3-­‐23

$56,500 $52,000 3 Critical  Habitat  Acquisition  (LT)

$104,000 LT_Key

Bedford Woodbury  Township Community  Center  Playground

BRC-­‐SC-­‐11-­‐167

$40,000 $40,000 11 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Bedford,  Fulton

Bedford  County Implementation  Services-­‐  Conservation  &  Greenways

BRC-­‐TAG-­‐14-­‐251

$15,000 $15,000 14 Greenway  Plans  (COMM)

$30,000 COMM_Key

Berks Amity  Township Leaf  Creek  Feasibility  Study

BRC-­‐TAG-­‐13-­‐178

$12,500 $12,500 13 Feasibility  Studies  (COMM)

$25,000 COMM_Key

Berks Amity  Township Monacacy  Hill BRC-­‐ACQ-­‐6-­‐11

$17,500 $17,500 6 Acquisition  (COMM)

$35,000 COMM_Key

Berks Bally  Borough Borough  Park KEY-­‐SC-­‐2-­‐6 $20,000 $20,000 2 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Berks Bechtelsville  Borough

Borough  Park KEY-­‐SC-­‐2-­‐9 $20,000 $20,000 2 Small  Communities/Small  Projects  (COMM)

$24,000 COMM_Key

Berks Bechtelsville  Borough

Borough  Park KEY-­‐SC-­‐5-­‐14 $20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$26,000 COMM_Key

Page 73: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  73  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Berks Berks  County Antietam  Lake  Park  -­‐  Development

BRC-­‐PRD-­‐17-­‐105

$354,869 $350,000 17 Park  Rehabilitation  and  Development  (COMM)

$709,738 COMM_Key

Berks Berks  County Antietam  Lake  Park  -­‐  Phase  4-­‐Development

BRC-­‐PRD-­‐18-­‐49

$396,355 $217,000 18 Park  Rehabilitation  and  Development  (COMM)

$792,709 COMM_Key

Berks Berks  County Greenway,  Park  &  Recreation  Plan

BRC-­‐TAG-­‐9-­‐21

$99,500 $85,000 9 Greenway  Plans  (COMM)

$199,100 COMM_Key

Berks Berks  County Hunsicker's  Grove KEY-­‐PRD-­‐3-­‐18

$92,000 $90,000 3 Park  Rehabilitation  and  Development  (COMM)

$184,000 COMM_Key

Berks Berks  County Stonecliffe  Recreation  Area

BRC-­‐PRD-­‐13.3-­‐336

$240,000 $200,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$780,000 COMM_Key

Berks Berks  County  Conservancy  

Angelica  Greenway  Feasibility  Study

BRC-­‐LTP-­‐13-­‐459

$35,700 $35,700 13 Feasibility  Studies  (COMM)

$71,400 LT_Key

Berks Berks  County  Conservancy  

Dent  Property  Conservation  Easement  -­‐  Oley  Hills  Area

BRC-­‐LTA-­‐12.5-­‐3

$346,000 $346,000 12.5 Open  Space  Acquisition  (LT)

$692,000 LT_Key

Page 74: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  74  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Berks Berks  County  Conservancy  

Furnace  Creek  Restoration  (Robesonia)

KEY-­‐RCD-­‐5-­‐1

$20,000 $50,000 5 Development  (RIV)

$100,000 RIVER_Key

Berks Berks  County  Conservancy  

Gehman  Easement  (Oley  Hills)

BRC-­‐LTA-­‐16-­‐233

$470,000 $200,000 16 Open  Space  Acquisition  (LT)

$940,000 LT_Key

Berks Berks  County  Conservancy  

Hay  Creek  Watershed  Plan

BRC-­‐RCP-­‐6-­‐13

$26,000 $26,000 6 Planning  (RIV) $52,000 RIVER_Key

Berks Berks  County  Conservancy  

Lobachsville  Trout  Hatchery

BRC-­‐LTA-­‐6-­‐1

$101,000 $100,000 6 Critical  Habitat  Acquisition  (LT)

$202,000 LT_Key

Berks Berks  County  Conservancy  

Neversink  Mountain  Preserve

BRC-­‐LTA-­‐6-­‐2

$153,000 $150,000 6 Critical  Habitat  Acquisition  (LT)

$306,000 LT_Key

Berks Berks  County  Conservancy  

Neversink  Mountain  Preserve

KEY-­‐LTA-­‐1-­‐1 $149,350 $60,000 1 Critical  Habitat  Acquisition  (LT)

$150,000 LT_Key

Berks Berks  County  Conservancy  

Neversink  Mountain  Preserve

KEY-­‐LTA-­‐2-­‐1 $36,500 $36,500 2 Critical  Habitat  Acquisition  (LT)

$73,000 LT_Key

Berks Berks  County  Conservancy  

Neversink  Mountain  Preserve

KEY-­‐LTA-­‐4-­‐1 $23,400 $22,000 4 Critical  Habitat  Acquisition  (LT)

$46,850 LT_Key

Berks Berks  County  Conservancy  

Oley  Hills:  Jones,  Kriebel  and  Morning  Properties

BRC-­‐LTA-­‐15-­‐113

$560,000 $455,500 15 Open  Space  Acquisition  (LT)

$1,195,000 LT_Key

Berks Berks  County  Conservancy  

Partners  Land  Acquisition

BRC-­‐LTA-­‐13-­‐18

$77,500 $20,400 13 Critical  Habitat  Acquisition  (LT)

$155,000 LT_Key

Page 75: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  75  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Berks Berks  County  Conservancy  

Roscher  Tract  Conservation  Easement

BRC-­‐LTA-­‐11-­‐7

$655,900 $650,000 11 Open  Space  Acquisition  (LT)

$1,311,800 LT_Key

Berks Berks  County  Conservancy  

Tulpehocken  Creek  Implementation  Plan

KEY-­‐RCD-­‐95-­‐06

$40,000 $40,000 1 Development  (RIV)

$80,000 RIVER_Key

Berks Berks  County  Conservancy  

Tulpehocken  Creek  Implementation  Plan

KEY-­‐RCD-­‐95-­‐17

$25,000 $25,000 1 Development  (RIV)

$50,000 RIVER_Key

Berks Berks  County  Conservancy  

Tulphehocken  Creek  Watershed  Cons.  Plan

KEY-­‐RCP-­‐96-­‐08

$19,000 $19,000 3 Planning  (RIV) $38,000 RIVER_Key

Berks Berks  County  Conservancy  

Wyomissing  Creek  Plan

BRC-­‐RCP-­‐7-­‐4

$21,000 $21,000 7 Planning  (RIV) $42,000 RIVER_Key

Berks Berks  County  Conservation  District  

Cacoosing  Flats  Stream  Restoration

BRC-­‐RCD-­‐8-­‐8

$7,000 $7,000 8 Development  (RIV)

$14,000 RIVER_Key

Berks Birdsboro  Borough Feasibility  Study  and  Master  Site  Plan  for  the  Hay

BRC-­‐TAG-­‐12-­‐279

$45,000 $75,000 12 Master  Site  Plans  (COMM)

$150,000 COMM_Key

Berks Birdsboro  Borough Mini  Comprehensive  Park  &  Recreation  Plan

BRC-­‐TAG-­‐11-­‐192

$11,000 $11,000 11 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$22,000 COMM_Key

Berks Boyertown  Borough Community  Park BRC-­‐PRD-­‐14-­‐116

$83,000 $83,000 14 Park  Rehabilitation  and  Development  (COMM)

$210,000 COMM_Key

Page 76: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  76  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Berks Boyertown Borough Community Pool Feasibility Study

BRC-TAG-19-127

$6,200.00 $6,200.00 19 Feasibility Studies (COMM)

$12,400.00 COMM_Key

Berks Boyertown Borough Community Pool Feasibility Study

BRC-TAG-19-127

$6,200.00 $6,200.00 19 Feasibility Studies (COMM)

$12,400.00 COMM_Key

Berks Boyertown Borough Community Pool Feasibility Study

BRC-TAG-19-127

$6,200.00 $6,200.00 19 Feasibility Studies (COMM)

$12,400.00 COMM_Key

Berks Boyertown  Borough Franklin  Street  Mini  Park  Rehabilitation

BRC-­‐SC-­‐11-­‐109

$20,000 $20,000 11 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Berks Caernarvon  Township

Caernarvon  Township  Park

BRC-­‐ACQ-­‐7-­‐31

$119,273 $119,000 7 Acquisition  (COMM)

$238,546 COMM_Key

Berks Cumru  Township Warren  House  Recreation  Area

KEY-­‐ACQ-­‐3-­‐46

$30,000 $12,500 3 Acquisition  (COMM)

$60,000 COMM_Key

Berks District  Township Fischer  Land  Acquisition

BRC-­‐ACQ-­‐17-­‐91

$67,800 $67,800 17 Acquisition  (COMM)

$135,900 COMM_Key

Berks District  Township Larchwood  Parcels KEY-­‐ACQ-­‐3-­‐47

$62,300 $62,300 3 Acquisition  (COMM)

$124,600 COMM_Key

Berks District  Township Manatawny  Creek  Watershed  Rivers  Cons.  Pl

KEY-­‐RCP-­‐96-­‐04

$41,000 $41,000 3 Planning  (RIV) $82,000 RIVER_Key

Berks Douglass  Township Ironstone  Park  and  Township  Park

BRC-­‐TAG-­‐7-­‐50

$10,000 $10,000 7 Master  Site  Plans  (COMM)

$20,000 COMM_Key

Berks Exeter  Township Farming  Ridge  Park  -­‐  Development

BRC-­‐PRD-­‐16-­‐136

$67,660 $67,600 16 Park  Rehabilitation  and  Development  (COMM)

$136,819 COMM_Key

Page 77: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  77  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Berks Exeter  Township Pineland  Park KEY-­‐PRD-­‐2-­‐47

$134,500 $134,500 2 Park  Rehabilitation  and  Development  (COMM)

$269,000 COMM_Key

Berks Exeter  Township Skate  Park BRC-­‐PRD-­‐11-­‐33

$58,800 $50,000 11 Park  Rehabilitation  and  Development  (COMM)

$117,700 COMM_Key

Berks Fleetwood  Borough Community  Park  -­‐  Phase  1(A)

BRC-­‐SC-­‐14-­‐84

$40,000 $40,000 14 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Berks Fleetwood  Borough Community  Park-­‐Phase  2-­‐Development

BRC-­‐SC-­‐18-­‐30

$40,000 $40,000 18 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Berks Fleetwood  Borough Pool  Feasibility  Study BRC-­‐TAG-­‐17-­‐8

$13,500 $13,500 17 Feasibility  Studies  (COMM)

$27,000 COMM_Key

Berks Hawk Mountain Sanctuary Association

Hawk Mountain Greenway Expansion

BRC-LTA-19-19

$271,664.50 $100,000.00 19 Open Space Acquisition (LT)

$543,329.00 LT_Key

Berks Hawk Mountain Sanctuary Association

Hawk Mountain Greenway Expansion

BRC-LTA-19-19

$271,664.50 $100,000.00 19 Open Space Acquisition (LT)

$543,329.00 LT_Key

Berks Hawk Mountain Sanctuary Association

Hawk Mountain Greenway Expansion

BRC-LTA-19-19

$271,664.50 $100,000.00 19 Open Space Acquisition (LT)

$543,329.00 LT_Key

Berks Hawk Mountain Sanctuary Association

Hawk Mountain Greenway Expansion

BRC-LTA-19-19

$271,664.50 $100,000.00 19 Open Space Acquisition (LT)

$543,329.00 LT_Key

Page 78: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  78  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Berks Hay  Creek  Valley  Historical  Association  

Hopewell  Big  Woods  -­‐  Joanna  Furnace

BRC-­‐RCD-­‐13-­‐3

$100,000 $120,000 13 Development  (RIV)

$287,500 RIVER_Key

Berks Hay  Creek  Watershed  Association  

Riparian  Buffer/Greenway  Plan

BRC-­‐RCI-­‐10-­‐14

$30,000 $30,000 10 Implementation  (RIV)

$60,000 RIVER_Key

Berks Kenhorst  Borough Kenhorst  Park KEY-­‐SC-­‐3-­‐100

$19,700 $19,700 3 Small  Communities/Small  Projects  (COMM)

$27,700 COMM_Key

Berks Kutztown  Borough Borough  Park KEY-­‐PRD-­‐1-­‐67

$55,170 $55,000 1 Park  Rehabilitation  and  Development  (COMM)

$110,340 COMM_Key

Berks Kutztown  Borough Kutztown  Master  Site  Plans

BRC-­‐TAG-­‐12-­‐241

$36,700 $36,700 12 Master  Site  Plans  (COMM)

$73,400 COMM_Key

Berks Kutztown  Borough Kutztown  Park-­‐  Development

BRC-­‐PRD-­‐18-­‐77

$100,000 $100,000 18 Park  Rehabilitation  and  Development  (COMM)

$200,000 COMM_Key

Berks Kutztown  Borough North  Park  -­‐  Phase  1  -­‐  Development

BRC-­‐PRD-­‐16-­‐142

$200,000 $200,000 16 Park  Rehabilitation  and  Development  (COMM)

$425,970 COMM_Key

Page 79: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  79  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Berks Kutztown  Borough Swimming  Pool  Renovation

KEY-­‐PRD-­‐3-­‐101

$242,400 $225,000 3 Park  Rehabilitation  and  Development  (COMM)

$484,800 COMM_Key

Berks Maxatawny  Township

William  DeLong  Memorial  Park-­‐Rehabilitation

BRC-­‐PRD-­‐15-­‐58

$36,353 $36,000 15 Park  Rehabilitation  and  Development  (COMM)

$72,705 COMM_Key

Berks Mohnton  Borough Mohnton  Recreation  Area

KEY-­‐PRD-­‐5-­‐133

$50,000 $50,000 5 Park  Rehabilitation  and  Development  (COMM)

$100,000 COMM_Key

Berks Mohnton  Borough Recreation  Area KEY-­‐ACQ-­‐2-­‐103

$30,000 $30,000 2 Acquisition  (COMM)

$60,000 COMM_Key

Berks Mt.  Penn  Borough  Municipal  Authority  

Carsonia  Park KEY-­‐SC-­‐5-­‐139

$19,790 $20,000 5 Small  Communities/Small  Projects  (COMM)

$21,290 COMM_Key

Berks Muhlenberg  Township

Comp.  Rec,  Park  &  Open  Space  Plan

BRC-­‐TAG-­‐8-­‐128

$30,000 $30,000 8 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$60,000 COMM_Key

Berks Muhlenberg  Township

Dietrich  Farm KEY-­‐ACQ-­‐4-­‐108

$300,000 $100,000 4 Acquisition  (COMM)

$1,200,000 COMM_Key

Page 80: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  80  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Berks Muhlenberg  Township

Jim  Dietrich  Park  -­‐  Phase  I

BRC-­‐PRD-­‐13.3-­‐403

$200,000 $200,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$807,500 COMM_Key

Berks Muhlenberg  Township

Laurel  Run BRC-­‐RCP-­‐7-­‐11

$18,500 $18,000 7 Planning  (RIV) $55,000 RIVER_Key

Berks Muhlenberg  Township

Master  Plans  for  2  Parks

BRC-­‐TAG-­‐9-­‐144

$32,500 $30,000 9 Master  Site  Plans  (COMM)

$75,000 COMM_Key

Berks Natural  Lands  Trust,  Inc.  

Green  Hills  Fee  Acquisition

BRC-­‐LTA-­‐17-­‐215

$1,065,000 $1,065,000 17 Open  Space  Acquisition  (LT)

$2,130,000 LT_Key

Berks Natural Lands Trust, Inc.

Green Hills Preserve Conservation Stewardship Plan

BRC-LTP-19-150

$20,000.00 $20,000.00 19 Open Space Planning (LT)

$40,000.00 LT_Key

Berks Natural Lands Trust, Inc.

Green Hills Preserve Conservation Stewardship Plan

BRC-LTP-19-150

$20,000.00 $20,000.00 19 Open Space Planning (LT)

$40,000.00 LT_Key

Berks Natural Lands Trust, Inc.

Green Hills Preserve Conservation Stewardship Plan

BRC-LTP-19-150

$20,000.00 $20,000.00 19 Open Space Planning (LT)

$40,000.00 LT_Key

Berks Natural  Lands  Trust,  Inc.  

Hay  Creek  Watershed  Property  Acquisition

BRC-­‐LTA-­‐18-­‐13

$278,000 $135,000 18 Open  Space  Acquisition  (LT)

$556,000 LT_Key

Berks Natural Lands Trust, Inc.

Killian Woods Acquisition

BRC-LTA-19-25

$834,500.00 $834,500.00 19 Open Space Acquisition (LT)

$1,669,000.00 LT_Key

Berks Natural Lands Trust, Inc.

Killian Woods Acquisition

BRC-LTA-19-25

$834,500.00 $834,500.00 19 Open Space Acquisition (LT)

$1,669,000.00 LT_Key

Berks Natural Lands Trust, Inc.

Killian Woods Acquisition

BRC-LTA-19-25

$834,500.00 $834,500.00 19 Open Space Acquisition (LT)

$1,669,000.00 LT_Key

Page 81: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  81  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Berks Natural Lands Trust, Inc.

Killian Woods Acquisition

BRC-LTA-19-25

$834,500.00 $834,500.00 19 Open Space Acquisition (LT)

$1,669,000.00 LT_Key

Berks Natural  Lands  Trust,  Inc.  

Yelenoc  Acquisition  (previously  was  Sheeder)

BRC-­‐LTA-­‐13-­‐19

$1,222,400 $1,220,000 13 Open  Space  Acquisition  (LT)

$2,444,800 LT_Key

Berks Pine  Creek  Valley  Watershed  Associaiton  

Headwaters  Protection

BRC-­‐LTA-­‐9-­‐19

$36,500 $36,000 9 Open  Space  Acquisition  (LT)

$73,000 LT_Key

Berks Reading  City 11th  and  Pike  Playground-­‐Development

BRC-­‐PRD-­‐17-­‐148

$100,000 $100,000 17 Park  Rehabilitation  and  Development  (COMM)

$300,000 COMM_Key

Berks Reading  City 11th  and  Pike  Recreation  Center

KEY-­‐PRD-­‐1-­‐113

$225,000 $150,000 1 Park  Rehabilitation  and  Development  (COMM)

$966,590 COMM_Key

Berks Reading  City Angelica  Creek  Trail-­‐Phase  I

BRC-­‐PRD-­‐14-­‐166

$18,000 $18,000 14 Park  Rehabilitation  and  Development  (COMM)

$36,000 COMM_Key

Berks Reading  City Baer  Park  Playground  -­‐  Rehabilitation

BRC-­‐PRD-­‐12-­‐193

$100,000 $100,000 12 Park  Rehabilitation  and  Development  (COMM)

$200,000 COMM_Key

Page 82: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  82  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Berks Reading  City Brookline  Playground

BRC-­‐PRD-­‐11-­‐73

$106,000 $100,000 11 Park  Rehabilitation  and  Development  (COMM)

$212,000 COMM_Key

Berks Reading  City Circuit  Rider BRC-­‐TAG-­‐16-­‐256

$190,500 $118,125 16 Circuit  Rider  (COMM)

$303,000 COMM_Key

Berks Reading  City Essick  and    3rd  &  Spring  Playgrounds

BRC-­‐PRD-­‐13.3-­‐419

$137,500 $137,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$275,000 COMM_Key

Berks Reading  City Keffer  Park-­‐Development

BRC-­‐PRD-­‐18-­‐95

$100,000 $100,000 18 Park  Rehabilitation  and  Development  (COMM)

$225,000 COMM_Key

Berks Reading  City Kerper's  Landing BRC-­‐PRD-­‐13-­‐137

$40,800 $40,000 13 Park  Rehabilitation  and  Development  (COMM)

$81,600 COMM_Key

Berks Reading  City Lance  Place  and  Second  &  Oley  Playgrounds

KEY-­‐PRD-­‐5-­‐169

$107,000 $100,000 5 Park  Rehabilitation  and  Development  (COMM)

$214,000 COMM_Key

Page 83: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  83  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Berks Reading  City Northmont  Playground

BRC-­‐PRD-­‐14-­‐167

$100,000 $100,000 14 Park  Rehabilitation  and  Development  (COMM)

$200,000 COMM_Key

Berks Reading  City Peer  to  Peer  Study BRC-­‐TAG-­‐16-­‐10

$10,000 $10,000 16 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$11,000 COMM_Key

Berks Reading  City Three  Sites KEY-­‐PRD-­‐2-­‐130

$146,000 $146,000 2 Park  Rehabilitation  and  Development  (COMM)

$292,000 COMM_Key

Berks Reading  City TreeVitalize  Metros BRC-­‐TV-­‐15-­‐11

$100,000 $100,000 15 Park  Rehabilitation  and  Development  (COMM)

$200,000 COMM_Key

Berks Reading Recreation Commission

Comprehensive Recreation, Park and Greenways Plan

BRC-TAG-19-143

$72,000.00 $72,000.00 19 Comp. Rec., Park, & Open Space Plans (COMM)

$80,000.00 COMM_Key

Berks Reading Recreation Commission

Comprehensive Recreation, Park and Greenways Plan

BRC-TAG-19-143

$72,000.00 $72,000.00 19 Comp. Rec., Park, & Open Space Plans (COMM)

$80,000.00 COMM_Key

Berks Reading Recreation Commission

Comprehensive Recreation, Park and Greenways Plan

BRC-TAG-19-143

$72,000.00 $72,000.00 19 Comp. Rec., Park, & Open Space Plans (COMM)

$80,000.00 COMM_Key

Page 84: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  84  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Berks Schuylkill  River  Greenway  Association  

Bartram  Trail BRC-­‐RTD-­‐6-­‐17

$50,000 $120,000 6 Rail  Rehabilitation  and  Development  (RT)

$232,000 RT_Key

Berks Schuylkill  River  Greenway  Association  

Schuylkill  River  Trail:  Leesport  Gap

BRC-­‐RCD-­‐17-­‐225

$76,595 $76,500 17 Development  (RIV)

$153,190 RIVER_Key

Berks Shillington  Borough Governor  Mifflin  Coordinating  Council  Peer-­‐to-­‐Peer  Study

BRC-­‐TAG-­‐16-­‐241

$10,000 $10,000 16 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$11,000 COMM_Key

Berks Shoemakersville  Borough

Shoemakersville  Community  Swimming  Pool-­‐Development

BRC-­‐PRD-­‐18-­‐99

$309,479 $310,000 18 Park  Rehabilitation  and  Development  (COMM)

$618,959 COMM_Key

Berks Shoemakersville  Borough

Skatepark BRC-­‐SC-­‐9-­‐187

$40,000 $40,000 9 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Berks Spring  Township Comprehensive  Recreation  &  Park  Plan

BRC-­‐TAG-­‐12-­‐262

$21,000 $21,000 12 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$42,000 COMM_Key

Berks Spring  Township Greenway  Study BRC-­‐TAG-­‐10-­‐170

$12,245 $12,000 10 Greenway  Plans  (COMM)

$24,490 COMM_Key

Berks Spring  Township Shiloh  Hills  Park  Expansion

BRC-­‐ACQ-­‐8-­‐184

$200,000 $200,000 8 Acquisition  (COMM)

$767,100 COMM_Key

Page 85: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  85  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Berks Spring  Township Shiloh  Hills  Park  Phase  I

BRC-­‐PRD-­‐11-­‐85

$200,000 $200,000 11 Park  Rehabilitation  and  Development  (COMM)

$700,000 COMM_Key

Berks Spring  Township South  Central  Park KEY-­‐ACQ-­‐4-­‐146

$120,000 $100,000 4 Acquisition  (COMM)

$403,900 COMM_Key

Berks St.  Lawrence  Borough

Borough  Park KEY-­‐SC-­‐2-­‐149

$20,000 $20,000 2 Small  Communities/Small  Projects  (COMM)

$21,900 COMM_Key

Berks Topton  Borough Pool  Rehabilitation BRC-­‐PRD-­‐11.5-­‐19

$144,500 $140,000 11.5 Park  Rehabilitation  and  Development  (COMM)

$289,100 COMM_Key

Berks Tulpehocken  Chapter  Trout  Unlimited  

Pine  Creek  Coult  Property  Restoration

BRC-­‐RCD-­‐8-­‐10

$14,900 $15,000 8 Development  (RIV)

$30,000 RIVER_Key

Berks Union  Township Recreation  Area  Improvements

BRC-­‐PRD-­‐11-­‐92

$50,000 $50,000 11 Park  Rehabilitation  and  Development  (COMM)

$200,000 COMM_Key

Berks Union  Township Recreation  Area  Master  Plan

BRC-­‐TAG-­‐7-­‐194

$20,000 $20,000 7 Master  Site  Plans  (COMM)

$40,000 COMM_Key

Berks Union  Township Recreation  Land  Acquisition

BRC-­‐ACQ-­‐12-­‐65

$12,000 $12,000 12 Acquisition  (COMM)

$24,100 COMM_Key

Page 86: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  86  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Berks Union  Township Schuylkill  River  Trail,  Thun  Section  Bridge  Study

BRC-­‐TAG-­‐18-­‐161

$55,000 $55,000 18 Trail  Study  (COMM)

$115,000 COMM_Key

Berks Upper  Bern  Township

Shartlesville  Community  Park  Restrooms  Renovation

BRC-­‐PRD-­‐12-­‐211

$40,000 $40,000 12 Park  Rehabilitation  and  Development  (COMM)

$80,000 COMM_Key

Berks Upper  Tulpehocken  Township

Recreation  Park BRC-­‐PRD-­‐10-­‐141

$315,000 $50,000 10 Park  Rehabilitation  and  Development  (COMM)

$695,500 COMM_Key

Berks Washington  Township

Feasibility  Study KEY-­‐RTP-­‐95-­‐29

$4,500 $4,500 1 Feasibility  Studies  (RT)

$9,000 RT_Key

Berks Washington  Township

Memorial  Park KEY-­‐SC-­‐2-­‐167

$20,000 $20,000 2 Small  Communities/Small  Projects  (COMM)

$24,000 COMM_Key

Berks Washington  Township

Township  Park KEY-­‐SC-­‐5-­‐214

$20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$27,000 COMM_Key

Berks Washington  Township

Township  Park  Rehab

BRC-­‐SC-­‐11-­‐162

$38,700 $38,000 11 Small  Communities/Small  Projects  (COMM)

$57,500 COMM_Key

Berks Washington  Township

Washington  Township  Park

BRC-­‐SC-­‐7-­‐205

$30,000 $30,000 7 Small  Communities/Small  Projects  (COMM)

$40,254 COMM_Key

Page 87: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  87  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Berks West  Lawn  Borough Community  Park KEY-­‐SC-­‐5-­‐224

$20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$23,868 COMM_Key

Berks West  Reading  Borough

West  Reading  Park BRC-­‐PRD-­‐13.6-­‐576

$19,300 $19,300 13.6 Park  Rehabilitation  and  Development  (COMM)

$38,500 COMM_Key

Berks West  Reading  Borough

West  Reading  Playground-­‐Rehabilitation

BRC-­‐SC-­‐15-­‐84

$40,000 $40,000 15 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Berks Windsor  Township Windsor  Township  Park

BRC-­‐PRD-­‐6-­‐201

$24,250 $24,000 6 Park  Rehabilitation  and  Development  (COMM)

$48,500 COMM_Key

Berks,  Chester French  &  Pickering  Creeks  Conservation  Trust,  Inc.  

Pine  Swamp KEY-­‐LTA-­‐4-­‐6 $481,500 $450,000 4 Critical  Habitat  Acquisition  (LT)

$963,000 LT_Key

Berks,  Chester Natural  Lands  Trust,  Inc.  

Compatible  Economic  Development  Plan  for  Middle  Schuylkill

BRC-­‐LTP-­‐13-­‐523

$60,500 $60,500 13 Open  Space  Planning  (LT)

$121,000 LT_Key

Berks, Chester, Montgomery

Natural Lands Trust, Inc.

Schuylkill Highlands Conservation Landscape Implementation 2014

BRC-SR-19-176

$213,486.80 $25,000.00 19 Partnerships Projects

$406,974.20 LT_Key

Page 88: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  88  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Berks, Chester, Montgomery

Natural Lands Trust, Inc.

Schuylkill Highlands Conservation Landscape Implementation 2014

BRC-SR-19-176

$213,486.80 $25,000.00 19 Partnerships Projects

$406,974.20 LT_Key

Berks, Chester, Montgomery

Natural Lands Trust, Inc.

Schuylkill Highlands Conservation Landscape Implementation 2014

BRC-SR-19-176

$213,486.80 $25,000.00 19 Partnerships Projects

$406,974.20 LT_Key

Berks, Chester, Montgomery

Natural Lands Trust, Inc.

Schuylkill Highlands Conservation Landscape Implementation 2014

BRC-SR-19-176

$213,486.80 $25,000.00 19 Partnerships Projects

$406,974.20 LT_Key

Berks, Chester, Montgomery

Natural Lands Trust, Inc.

Schuylkill Highlands Conservation Landscape Implementation 2014

BRC-SR-19-176

$213,486.80 $25,000.00 19 Partnerships Projects

$406,974.20 LT_Key

Berks, Chester, Montgomery

Natural Lands Trust, Inc.

Schuylkill Highlands Conservation Landscape Implementation 2014

BRC-SR-19-176

$213,486.80 $25,000.00 19 Partnerships Projects

$406,974.20 LT_Key

Berks, Chester, Montgomery

Natural Lands Trust, Inc.

Schuylkill Highlands Conservation Landscape Implementation 2014

BRC-SR-19-176

$213,486.80 $25,000.00 19 Partnerships Projects

$406,974.20 LT_Key

Berks, Chester, Montgomery

Natural Lands Trust, Inc.

Schuylkill Highlands Conservation Landscape Implementation 2014

BRC-SR-19-176

$213,486.80 $25,000.00 19 Partnerships Projects

$406,974.20 LT_Key

Berks, Chester, Montgomery

Natural Lands Trust, Inc.

Schuylkill Highlands Conservation Landscape Implementation 2014

BRC-SR-19-176

$213,486.80 $25,000.00 19 Partnerships Projects

$406,974.20 LT_Key

Berks, Chester, Montgomery

Natural Lands Trust, Inc.

Schuylkill Highlands Conservation Landscape Implementation 2014

BRC-SR-19-176

$213,486.80 $25,000.00 19 Partnerships Projects

$406,974.20 LT_Key

Page 89: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  89  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Berks, Chester, Montgomery

Natural Lands Trust, Inc.

Schuylkill Highlands Conservation Landscape Implementation 2014

BRC-SR-19-176

$213,486.80 $25,000.00 19 Partnerships Projects

$406,974.20 LT_Key

Berks,  Lehigh Albany  Township Upper  Maiden  Creek BRC-­‐RCP-­‐7-­‐2

$25,000 $25,000 7 Planning  (RIV) $50,000 RIVER_Key

Blair Altoona  City Four  Sites KEY-­‐PRD-­‐1-­‐3

$133,000 $75,000 1 Park  Rehabilitation  and  Development  (COMM)

$266,000 COMM_Key

Blair Altoona  City Westfall  Park KEY-­‐PRD-­‐4-­‐9

$75,000 $75,000 4 Park  Rehabilitation  and  Development  (COMM)

$150,000 COMM_Key

Blair Bellwood  Borough Bellwood  Greenway  Study  &  Plan

KEY-­‐RTP-­‐4-­‐5 $4,000 $4,000 4 Feasibility  Studies  (RT)

$8,000 RT_Key

Blair Bellwood  Borough Bellwood  Park BRC-­‐SC-­‐8-­‐21

$27,300 $27,000 8 Small  Communities/Small  Projects  (COMM)

$34,600 COMM_Key

Blair Bellwood  Borough Bellwood-­‐Antis  Pool  Renovation

KEY-­‐SC-­‐3-­‐15 $20,000 $20,000 3 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Blair Bellwood  Borough Community  Swimming  Pool

BRC-­‐PRD-­‐13-­‐89

$164,100 $287,000 13 Park  Rehabilitation  and  Development  (COMM)

$328,100 COMM_Key

Page 90: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  90  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Blair Blair  County Fort  Roberdeau  Historic  Site  &  Natural  Area

BRC-­‐ACQ-­‐7-­‐21

$281,500 $250,000 7 Acquisition  (COMM)

$563,000 COMM_Key

Blair Blair  Township Fort  Fetter  Community  Park  Acquisition

BRC-­‐ACQ-­‐9-­‐23

$40,900 $40,000 9 Acquisition  (COMM)

$81,800 COMM_Key

Blair Central  Blair  County  Recreation  and  Park  Commission  

Circuit  Rider  -­‐(Year  3)

KEY-­‐TAG-­‐2-­‐25

$18,928 $18,900 2 Circuit  Rider  (COMM)

$37,856 COMM_Key

Blair Duncansville  Borough

Duncansville  Memorial  Park

BRC-­‐SC-­‐7-­‐53

$25,500 $25,000 7 Small  Communities/Small  Projects  (COMM)

$33,327 COMM_Key

Blair Greenfield  Township Claysburg  Area  Community  Park

BRC-­‐SC-­‐9-­‐87

$32,700 $30,000 9 Small  Communities/Small  Projects  (COMM)

$49,500 COMM_Key

Blair Greenfield  Township Claysburg  Community  Park

KEY-­‐SC-­‐5-­‐74 $20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$22,000 COMM_Key

Blair Hollidaysburg  Borough

Beaverdam  Branch  Greenway

KEY-­‐TAG-­‐5-­‐17

$20,000 $20,000 5 Greenway  Plans  (COMM)

$40,000 COMM_Key

Blair Hollidaysburg  Borough

Chimney  Rocks  Park KEY-­‐PRD-­‐3-­‐90

$125,000 $125,000 3 Park  Rehabilitation  and  Development  (COMM)

$250,000 COMM_Key

Blair Hollidaysburg  Borough

Chimney  Rocks  Park  Addition

BRC-­‐ACQ-­‐6-­‐84

$71,500 $50,000 6 Acquisition  (COMM)

$143,000 COMM_Key

Page 91: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  91  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Blair Hollidaysburg  Borough

Hollidaysburg  Canal  Basin  Park-­‐Phase  V

BRC-­‐PRD-­‐8-­‐86

$291,300 $181,300 8 Park  Rehabilitation  and  Development  (COMM)

$582,500 COMM_Key

Blair Hollidaysburg  Borough

Peer  Study BRC-­‐TAG-­‐9-­‐1

$7,500 $7,500 9 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$8,250 COMM_Key

Blair Logan  Township Logan  Township  Wellness  Trail

BRC-­‐PRD-­‐14-­‐151

$74,600 $74,600 14 Park  Rehabilitation  and  Development  (COMM)

$149,100 COMM_Key

Blair Martinsburg  Borough

Hershberger  Pool KEY-­‐PRD-­‐3-­‐128

$70,442 $50,000 3 Park  Rehabilitation  and  Development  (COMM)

$140,884 COMM_Key

Blair Rails-­‐To-­‐Trails  of  Central  Pennsylvania,  Inc.  

Canoe  Creek  Extension  of  Lower  Trail

KEY-­‐RTD-­‐5-­‐15

$125,000 $125,000 5 Rail  Rehabilitation  and  Development  (RT)

$250,000 RT_Key

Blair Rails-­‐To-­‐Trails  of  Central  Pennsylvania,  Inc.  

Lower  Trail  Gap  Feasibility  Study

BRC-­‐RTP-­‐14-­‐283

$22,500 $22,500 14 Feasibility  Studies  (RT)

$45,000 RT_Key

Page 92: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  92  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Blair Tyrone  Borough Reservoir  Park BRC-­‐PRD-­‐7-­‐193

$65,000 $65,000 7 Park  Rehabilitation  and  Development  (COMM)

$130,000 COMM_Key

Blair Tyrone  Borough Reservoir  Park  -­‐  Phases  1  &  2  Development

BRC-­‐PRD-­‐12-­‐209

$110,000 $110,000 12 Park  Rehabilitation  and  Development  (COMM)

$220,000 COMM_Key

Blair Williamsburg  Borough

Peer-­‐to-­‐Peer BRC-­‐TAG-­‐7-­‐6

$7,500 $7,500 7 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$8,250 COMM_Key

Blair Williamsburg  Borough

Riverside  Park KEY-­‐SC-­‐2-­‐178

$20,000 $20,000 2 Small  Communities/Small  Projects  (COMM)

$21,200 COMM_Key

Blair,  Cambria Cambria  County  Conservation  and  Recreation  Authority  

Rehabilitate  the  6-­‐10  Trail

BRC-­‐PRT-­‐13-­‐23

$579,700 $279,000 13 Construction $724,700 COMM_Key

Blair,  Huntingdon

Little  Juniata  River  Association  

Upper  Juniata  Public  Access  Easements

BRC-­‐RCA-­‐14-­‐292

$130,000 $200,000 14 Acquisition  (RIV)

$260,000 RIVER_Key

Blair,  Huntingdon

Rails-­‐To-­‐Trails  of  Central  Pennsylvania,  Inc.  

Lower  Trail BRC-­‐RTD-­‐11-­‐10

$344,400 $200,000 11 Rail  Rehabilitation  and  Development  (RT)

$688,800 RT_Key

Page 93: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  93  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Bradford Athens  Borough Borough  Park KEY-­‐SC-­‐2-­‐4 $17,569 $17,500 2 Small  Communities/Small  Projects  (COMM)

$21,569 COMM_Key

Bradford Athens  Borough Peer-­‐to-­‐Peer BRC-­‐TAG-­‐10-­‐6

$7,500 $7,500 10 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$8,250 COMM_Key

Bradford Athens  Borough Valley  Recreation  Center

KEY-­‐PRD-­‐5-­‐9

$37,120 $37,100 5 Park  Rehabilitation  and  Development  (COMM)

$74,240 COMM_Key

Bradford Bradford  County Bradford  County  Parks  Master  Plans

BRC-­‐TAG-­‐13.6-­‐587

$64,900 $64,900 13.6 Master  Site  Plans  (COMM)

$129,800 COMM_Key

Bradford Bradford  County Hornbrook  Park  Boat  Launch

BRC-­‐PRD-­‐11-­‐9

$28,700 $25,000 11 Park  Rehabilitation  and  Development  (COMM)

$71,400 COMM_Key

Bradford Bradford County Larnard-Hornbrook Park– Development

BRC-PRD-19-60

$58,600.00 $58,000.00 19 Park Rehabilitation and Development (COMM)

$117,820.00 COMM_Key

Bradford Bradford County Larnard-Hornbrook Park– Development

BRC-PRD-19-60

$58,600.00 $58,000.00 19 Park Rehabilitation and Development (COMM)

$117,820.00 COMM_Key

Page 94: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  94  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Bradford Bradford County Larnard-Hornbrook Park– Development

BRC-PRD-19-60

$58,600.00 $58,000.00 19 Park Rehabilitation and Development (COMM)

$117,820.00 COMM_Key

Bradford Bradford  County Open  Space,  Greenways  and  Outdoor  Rec.  Plan

BRC-­‐TAG-­‐9-­‐28

$47,200 $45,000 9 Greenway  Plans  (COMM)

$90,000 COMM_Key

Bradford Bradford  County Peer-­‐to-­‐Peer  Technical  Assistance

BRC-­‐TAG-­‐18-­‐139

$10,000 $10,000 18 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$11,000 COMM_Key

Bradford Bradford  County Sunfish  Pond  County  Park  Development

BRC-­‐PRD-­‐18-­‐51

$79,300 $79,000 18 Park  Rehabilitation  and  Development  (COMM)

$159,830 COMM_Key

Bradford Bradford  County  Conservation  District  

Wilbur  Beers  Natural  Area

BRC-­‐PRD-­‐7-­‐24

$28,000 $20,000 7 Park  Rehabilitation  and  Development  (COMM)

$56,728 COMM_Key

Bradford Central  Bradford  County  Economic  Development  Authority  

East  Side  Memorial  Riverfront  Park

KEY-­‐PRD-­‐1-­‐30

$200,000 $130,000 1 Park  Rehabilitation  and  Development  (COMM)

$400,600 COMM_Key

Bradford Monroe  Borough Monroeton  Park BRC-­‐SC-­‐11-­‐137

$8,700 $24,000 11 Small  Communities/Small  Projects  (COMM)

$31,300 COMM_Key

Page 95: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  95  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Bradford Ridgebury  Township Ridgebury  Township  Park

BRC-­‐SC-­‐10-­‐95

$40,000 $40,000 10 Small  Communities/Small  Projects  (COMM)

$149,000 COMM_Key

Bradford Towanda  Borough Comm.  Gateways  &  Garden  Program

KEY-­‐SC-­‐4-­‐150

$20,000 $20,000 4 Small  Communities/Small  Projects  (COMM)

$32,100 COMM_Key

Bradford Towanda  Borough Phase  I  -­‐  SCI  Complex  Renovation

BRC-­‐PRD-­‐10-­‐11

$100,000 $100,000 10 Park  Rehabilitation  and  Development  (COMM)

$259,500 COMM_Key

Bradford Towanda  Borough SCI/YMCA  Recreation  Center

BRC-­‐PRD-­‐13.3-­‐438

$135,000 $235,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$284,000 COMM_Key

Bradford Towanda  Borough Third  Ward  Playground

KEY-­‐SC-­‐3-­‐220

$20,000 $20,000 3 Small  Communities/Small  Projects  (COMM)

$31,200 COMM_Key

Bradford Troy  Borough Troy  Pool  Rehab BRC-­‐SC-­‐11-­‐160

$24,000 $24,000 11 Small  Communities/Small  Projects  (COMM)

$28,000 COMM_Key

Bradford Warren  Township Community  Park BRC-­‐SC-­‐6-­‐189

$20,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$27,142 COMM_Key

Page 96: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  96  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Bradford Warren  Township Community  Park  -­‐  Development

BRC-­‐SC-­‐16-­‐49

$39,990 $40,000 16 Small  Communities/Small  Projects  (COMM)

$59,981 COMM_Key

Bradford Wells  Township Community  Park  Playground  Equipment

BRC-­‐SC-­‐8-­‐211

$29,200 $29,000 8 Small  Communities/Small  Projects  (COMM)

$38,300 COMM_Key

Bradford Wyalusing  Borough Park  Expansion  Acquisition

BRC-­‐ACQ-­‐12-­‐66

$17,500 $17,500 12 Acquisition  (COMM)

$35,000 COMM_Key

Bradford Wyalusing  Borough Wyalusing  Park  Rehabilitation

BRC-­‐SC-­‐10-­‐106

$20,000 $20,000 10 Small  Communities/Small  Projects  (COMM)

$32,600 COMM_Key

Bradford,  Luzerne

Avoca  Borough Greenway  Plan KEY-­‐TAG-­‐1-­‐7

$5,000 $5,000 1 Greenway  Plans  (COMM)

$10,000 COMM_Key

Bradford,  Luzerne,  Sullivan,  Wyoming

Pennsylvania  Environmental  Council,  Inc.  

Mehoopany  Creek  River  Conservation  Plan

BRC-­‐RCP-­‐8-­‐11

$34,100 $34,000 8 Planning  (RIV) $68,300 RIVER_Key

Bradford,  Sullivan,  Tioga

Bradford  County  Conservation  District  

Sugar  &  Towanda  Creeks  Watersheds  RCP

BRC-­‐RCP-­‐11-­‐4

$107,400 $100,000 11 Planning  (RIV) $247,700 RIVER_Key

Bucks American  Littoral  Soc/Delaware  Riverkeeper  Network  

Upper  &  Middle  Neshaminy  Watershed  Plan

BRC-­‐RCP-­‐6-­‐9

$62,500 $62,500 6 Planning  (RIV) $125,000 RIVER_Key

Bucks Bensalem  Township Bensalem  Twp.  Greenway  Plan

KEY-­‐RCI-­‐6-­‐7 $75,000 $75,000 6 Implementation  (RIV)

$176,000 RIVER_Key

Page 97: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  97  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Bucks Bensalem  Township Richlieu  Park KEY-­‐PRD-­‐4-­‐13

$200,000 $100,000 4 Park  Rehabilitation  and  Development  (COMM)

$400,000 COMM_Key

Bucks Bridgeton  Township Tinicum  Creek  Watershed  Demonstration  Project

BRC-­‐RCP-­‐7-­‐5

$31,000 $12,000 7 Planning  (RIV) $62,000 RIVER_Key

Bucks Bristol  Borough Bristol  Spurline  Extension

KEY-­‐RTD-­‐4-­‐6

$45,000 $45,000 4 Rail  Rehabilitation  and  Development  (RT)

$95,700 RT_Key

Bucks Bristol  Borough Bristol  Spurline  Extension  Riverfront  N.  Section

BRC-­‐RCD-­‐6-­‐6

$100,000 $100,000 6 Development  (RIV)

$300,000 RIVER_Key

Bucks Bristol  Borough Bristol  Spurline  Park  Trail-­‐Del.  River  Access  Sec.

BRC-­‐PRD-­‐8-­‐26

$100,000 $100,000 8 Park  Rehabilitation  and  Development  (COMM)

$215,000 COMM_Key

Bucks Bristol  Borough Delaware  Canal KEY-­‐ACQ-­‐5-­‐24

$100,000 $100,000 5 Acquisition  (COMM)

$200,000 COMM_Key

Bucks Bristol  Borough Spurline  Park  Extension

KEY-­‐RTD-­‐95-­‐5

$46,000 $46,000 1 Rail  Rehabilitation  and  Development  (RT)

$92,200 RT_Key

Page 98: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  98  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Bucks Bristol  Township Black  Ditch  Creek  Trail  Implementation  Study

BRC-­‐RCI-­‐6-­‐5 $15,000 $15,000 6 Implementation  (RIV)

$30,000 RIVER_Key

Bucks Bristol  Township Croydon  Acres  Park KEY-­‐PRD-­‐5-­‐25

$65,100 $65,000 5 Park  Rehabilitation  and  Development  (COMM)

$130,200 COMM_Key

Bucks Buckingham  Township

Hansel  Park KEY-­‐PRD-­‐1-­‐22

$56,000 $56,000 1 Park  Rehabilitation  and  Development  (COMM)

$112,000 COMM_Key

Bucks Buckingham  Township

Holicong  Park  Master  Site  Plan

BRC-­‐TAG-­‐16-­‐53

$24,425 $24,400 16 Master  Site  Plans  (COMM)

$48,850 COMM_Key

Bucks Bucks  County Churchville  Nature  Center  Plan

BRC-­‐TAG-­‐7-­‐27

$40,000 $40,000 7 Master  Site  Plans  (COMM)

$102,000 COMM_Key

Bucks Bucks  County Churchville  Nature  Center  Plan

BRC-­‐TAG-­‐7-­‐27

$40,000 $11,000 7 Master  Site  Plans  (COMM)

$102,000 COMM_Key

Bucks Bucks  County CPROSP,  Greenway  Plan,  and  NAI  Update

BRC-­‐TAG-­‐13-­‐179

$130,200 $130,000 13 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$260,500 COMM_Key

Bucks Bucks  County Lockheed-­‐Martin  Open  Space

KEY-­‐ACQ-­‐2-­‐21

$500,000 $500,000 2 Acquisition  (COMM)

$1,500,000 COMM_Key

Bucks Bucks  County Middle  Neshaminy  Creek  Greenway  -­‐  Multi-­‐use  Trail  Feasibility  Study

BRC-­‐TAG-­‐18-­‐156

$45,000 $40,000 18 Trail  Study  (COMM)

$90,150 COMM_Key

Page 99: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  99  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Bucks Bucks  County Neshaminy  Creek  Land  Acquisition

BRC-­‐ACQ-­‐8-­‐27

$175,000 $175,000 8 Acquisition  (COMM)

$350,000 COMM_Key

Bucks Bucks  County Peace  Valley  Nature  Center

KEY-­‐PRD-­‐1-­‐23

$120,000 $100,000 1 Park  Rehabilitation  and  Development  (COMM)

$240,000 COMM_Key

Bucks Bucks  County Peace  Valley  Park BRC-­‐PRD-­‐7-­‐28

$250,000 $250,000 7 Park  Rehabilitation  and  Development  (COMM)

$500,000 COMM_Key

Bucks Chalfont  Borough Breitinger  Tract  Acquisition

BRC-­‐ACQ-­‐12.5-­‐12

$200,000 $200,000 12.5 Acquisition  (COMM)

$400,000 COMM_Key

Bucks Chalfont  Borough Chestnut  Street  Park KEY-­‐SC-­‐3-­‐37 $20,000 $20,000 3 Small  Communities/Small  Projects  (COMM)

$34,900 COMM_Key

Bucks Chalfont  Borough Kelly  Park-­‐  Development

BRC-­‐PRD-­‐18-­‐53

$173,749 $173,700 18 Park  Rehabilitation  and  Development  (COMM)

$347,498 COMM_Key

Bucks Chalfont  Borough Muncipal  Parks  Master  Site  Plans

BRC-­‐TAG-­‐14-­‐193

$18,600 $18,600 14 Master  Site  Plans  (COMM)

$37,200 COMM_Key

Bucks Chalfont  Borough Tri-­‐municipal  Master  Trail  and  Greenway  Plan

BRC-­‐TAG-­‐12-­‐230

$40,000 $40,000 12 Greenway  Plans  (COMM)

$80,000 COMM_Key

Bucks Doylestown  Township

Community  Trail  Feasibility  Study

BRC-­‐TAG-­‐14-­‐198

$17,500 $17,500 14 Trail  Study  (COMM)

$35,000 COMM_Key

Page 100: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  100  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Bucks Doylestown  Township

Destination  Peace  Valley  Pedestrian  Trail  and  Bridge  -­‐  Development

BRC-­‐PRD-­‐18-­‐63

$200,297 $200,000 18 Park  Rehabilitation  and  Development  (COMM)

$400,594 COMM_Key

Bucks Doylestown  Township

Municipal  Bicycle  Path

KEY-­‐PRD-­‐2-­‐38

$49,780 $40,000 2 Park  Rehabilitation  and  Development  (COMM)

$99,560 COMM_Key

Bucks Doylestown  Township

Rec.,  Park  &  Open  Space  Plan

BRC-­‐TAG-­‐9-­‐65

$25,000 $25,000 9 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$50,000 COMM_Key

Bucks Durham  Township Kerl  Easement BRC-­‐ACQ-­‐13.3-­‐542

$397,950 $295,000 13.3 Acquisition  (COMM)

$795,900 COMM_Key

Bucks Durham  Township Wallace  Frank  Conservation  Easement

BRC-­‐ACQ-­‐14-­‐52

$298,000 $298,000 14 Acquisition  (COMM)

$715,600 COMM_Key

Bucks Falls  Township Biles  Island  Master  Site  Plan

BRC-­‐TAG-­‐18-­‐146

$210,000 $92,000 18 Master  Site  Plans  (COMM)

$420,000 COMM_Key

Bucks Falls  Township Coastal  Plain  Forest  Nature  Preserve

BRC-­‐ACQ-­‐6-­‐63

$228,000 $228,000 6 Acquisition  (COMM)

$482,300 COMM_Key

Bucks Haycock  Township Schoenfeld  Conservation  Easement

BRC-­‐ACQ-­‐9-­‐91

$145,000 $145,000 9 Acquisition  (COMM)

$292,000 COMM_Key

Bucks Heritage  Conservancy  

Bellwood  Preserve  North  Master  Site  Plan

BRC-­‐LTP-­‐14-­‐209

$38,500 $38,500 14 Critical  Habitat  Planning  (LT)

$80,900 LT_Key

Page 101: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  101  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Bucks Heritage  Conservancy  

Bristol  Marsh  Conservation  Plan

BRC-­‐LTP-­‐13.3-­‐545

$14,600 $14,600 13.3 Open  Space  Planning  (LT)

$32,600 LT_Key

Bucks Heritage  Conservancy  

Camp  Ockanickon BRC-­‐LTA-­‐6-­‐11

$231,400 $200,000 6 Critical  Habitat  Acquisition  (LT)

$477,000 LT_Key

Bucks Heritage  Conservancy  

Cory  Property  Conservation  Easement

BRC-­‐LTA-­‐12.5-­‐1

$387,700 $385,000 12.5 Critical  Habitat  Acquisition  (LT)

$775,500 LT_Key

Bucks Heritage Conservancy Croydon Woods Acquisition

BRC-LTA-19-20

########## ########## 19 Open Space Acquisition (LT)

$5,870,000.00 LT_Key

Bucks Heritage Conservancy Croydon Woods Acquisition

BRC-LTA-19-20

########## ########## 19 Open Space Acquisition (LT)

$5,870,000.00 LT_Key

Bucks Heritage Conservancy Croydon Woods Acquisition

BRC-LTA-19-20

########## ########## 19 Open Space Acquisition (LT)

$5,870,000.00 LT_Key

Bucks Heritage Conservancy Dorey Property Conservation Easement

BRC-LTA-19-21

$750,067.00 $501,000.00 19 Critical Habitat Acquisition (LT)

$1,500,134.00 LT_Key

Bucks Heritage Conservancy Dorey Property Conservation Easement

BRC-LTA-19-21

$750,067.00 $501,000.00 19 Critical Habitat Acquisition (LT)

$1,500,134.00 LT_Key

Bucks Heritage Conservancy Dorey Property Conservation Easement

BRC-LTA-19-21

$750,067.00 $501,000.00 19 Critical Habitat Acquisition (LT)

$1,500,134.00 LT_Key

Bucks Heritage  Conservancy  

Farbotnik  Conservation  Easement

BRC-­‐LTA-­‐14-­‐31

$182,250 $179,000 14 Critical  Habitat  Acquisition  (LT)

$364,500 LT_Key

Bucks Heritage  Conservancy  

Hoffman  Property  Conservation  Easement

BRC-­‐LTA-­‐17-­‐54

$102,975 $102,900 17 Open  Space  Acquisition  (LT)

$394,900 LT_Key

Page 102: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  102  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Bucks Heritage  Conservancy  

Honey  Hollow  Conservation  and  Watershed  Protection  Model

BRC-­‐LTP-­‐14-­‐210

$16,000 $16,000 14 Critical  Habitat  Planning  (LT)

$32,000 LT_Key

Bucks Heritage  Conservancy  

Jenkins-­‐Moyer  Conservation  Easement

BRC-­‐LTA-­‐13-­‐20

$161,000 $161,000 13 Open  Space  Acquisition  (LT)

$337,000 LT_Key

Bucks Heritage  Conservancy  

Limantour  Property  Conservation  Easement

BRC-­‐LTA-­‐11-­‐12

$88,000 $67,000 11 Open  Space  Acquisition  (LT)

$176,000 LT_Key

Bucks Heritage  Conservancy  

Little  Neshaminy  Creek  Rivers  Conserv.  Plan

BRC-­‐RCP-­‐10-­‐3

$51,300 $63,000 10 Planning  (RIV) $106,500 RIVER_Key

Bucks Heritage  Conservancy  

Lower  Delaware  River  Conservation  Plan

KEY-­‐RCP-­‐96-­‐03

$25,000 $65,000 3 Planning  (RIV) $50,000 RIVER_Key

Bucks Heritage  Conservancy  

Lower  Neshaminy  Creek

BRC-­‐RCP-­‐7-­‐8

$80,175 $80,000 7 Planning  (RIV) $174,363 RIVER_Key

Bucks Heritage  Conservancy  

Magidson  Conservation  Easement

BRC-­‐LTA-­‐9-­‐7

$117,400 $115,000 9 Critical  Habitat  Acquisition  (LT)

$255,500 LT_Key

Bucks Heritage  Conservancy  

Martins  Creek  Buffer  Restoration

BRC-­‐RCI-­‐17-­‐164

$16,681 $14,100 17 Implementation  (RIV)

$33,362 RIVER_Key

Bucks Heritage  Conservancy  

Mulligan  Conservation  Easement

KEY-­‐LTA-­‐1-­‐3 $35,000 $35,000 1 Open  Space  Acquisition  (LT)

$90,000 LT_Key

Bucks Heritage  Conservancy  

Neis  Conservation  Easement

BRC-­‐LTA-­‐11.5-­‐2

$202,000 $200,000 11.5 Open  Space  Acquisition  (LT)

$404,000 LT_Key

Page 103: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  103  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Bucks Heritage  Conservancy  

Phelps  Property/Quakertown  Swamp

BRC-­‐LTA-­‐7-­‐10

$130,050 $130,000 7 Open  Space  Acquisition  (LT)

$295,000 LT_Key

Bucks Heritage  Conservancy  

Quakertown  Swamp KEY-­‐LTP-­‐4-­‐8 $7,500 $7,500 4 Open  Space  Planning  (LT)

$15,000 LT_Key

Bucks Heritage  Conservancy  

Rattlesnake  and  Mine  Hill  Wildlife  Easement

BRC-­‐LTA-­‐15-­‐117

$244,000 $244,000 15 Open  Space  Acquisition  (LT)

$488,000 LT_Key

Bucks Heritage  Conservancy  

Romano  Property BRC-­‐LTA-­‐6-­‐12

$70,587 $70,000 6 Critical  Habitat  Acquisition  (LT)

$157,000 LT_Key

Bucks Heritage  Conservancy  

Skoriak  Property  (Cooks  Creek)

BRC-­‐LTA-­‐9-­‐8

$65,000 $65,000 9 Critical  Habitat  Acquisition  (LT)

$147,100 LT_Key

Bucks Heritage  Conservancy  

Skoriak  Property  Conservation  Easement

BRC-­‐LTA-­‐16-­‐31

$91,650 $91,600 16 Critical  Habitat  Acquisition  (LT)

$183,300 LT_Key

Bucks Heritage  Conservancy  

Snider  Property  Conservation  Easement

BRC-­‐LTA-­‐16-­‐30

$191,900 $191,000 16 Critical  Habitat  Acquisition  (LT)

$383,800 LT_Key

Bucks Hilltown  Township Pedestrian/Bike  Path KEY-­‐PRD-­‐5-­‐88

$65,000 $65,000 5 Park  Rehabilitation  and  Development  (COMM)

$130,000 COMM_Key

Bucks Hulmeville  Borough Borough  Park KEY-­‐SC-­‐2-­‐65 $20,000 $20,000 2 Small  Communities/Small  Projects  (COMM)

$45,000 COMM_Key

Page 104: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  104  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Bucks Langhorne  Borough Mayor's  Playground KEY-­‐SC-­‐3-­‐107

$20,000 $20,000 3 Small  Communities/Small  Projects  (COMM)

$32,900 COMM_Key

Bucks Langhorne  Borough Roach  Property  Acquisition

BRC-­‐ACQ-­‐9-­‐110

$440,000 $440,000 9 Acquisition  (COMM)

$880,000 COMM_Key

Bucks Lower  Makefield  Township

Vargo  Tract KEY-­‐ACQ-­‐2-­‐87

$175,000 $175,000 2 Acquisition  (COMM)

$1,555,800 COMM_Key

Bucks Lower  Southampton  Township

Comp.  Rec.,  Park  &  Open  Space  Plan

KEY-­‐TAG-­‐3-­‐120

$12,500 $12,500 3 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$25,000 COMM_Key

Bucks Lower  Southampton  Township

Ferderbar  Pool BRC-­‐PRD-­‐7-­‐107

$60,000 $60,000 7 Park  Rehabilitation  and  Development  (COMM)

$120,000 COMM_Key

Bucks Middletown  Township

Beachwood  &  Veterans  Parks  Master  Plans

BRC-­‐TAG-­‐12-­‐250

$28,000 $28,000 12 Master  Site  Plans  (COMM)

$56,000 COMM_Key

Bucks Middletown  Township

Beechwood  Park-­‐Development

BRC-­‐PRD-­‐15-­‐60

$200,000 $180,000 15 Park  Rehabilitation  and  Development  (COMM)

$1,396,000 COMM_Key

Bucks Middletown  Township

Comp.  Rec,  Parks,  Open  Space  &  Greenway  Pl

BRC-­‐TAG-­‐9-­‐134

$30,200 $30,000 9 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$60,400 COMM_Key

Page 105: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  105  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Bucks Middletown  Township

Middletown  Park KEY-­‐PRD-­‐1-­‐85

$200,000 $100,000 1 Park  Rehabilitation  and  Development  (COMM)

$2,216,000 COMM_Key

Bucks Middletown  Township

Parcel  66 KEY-­‐ACQ-­‐5-­‐130

$200,000 $200,000 5 Acquisition  (COMM)

$800,000 COMM_Key

Bucks Middletown  Township

Styer  Pavilion  Project BRC-­‐PRD-­‐8-­‐118

$74,400 $74,000 8 Park  Rehabilitation  and  Development  (COMM)

$148,800 COMM_Key

Bucks Milford Township Camp Cedar Hill Acquisition

BRC-ACQ-19-11

$106,444.85 $106,000.00 19 Acquisition (COMM)

$212,890.00 COMM_Key

Bucks Milford Township Camp Cedar Hill Acquisition

BRC-ACQ-19-11

$106,444.85 $106,000.00 19 Acquisition (COMM)

$212,890.00 COMM_Key

Bucks Milford Township Camp Cedar Hill Acquisition

BRC-ACQ-19-11

$106,444.85 $106,000.00 19 Acquisition (COMM)

$212,890.00 COMM_Key

Bucks Milford  Township Comprehensive  Recreation,  Park  and  Open  Space  Plan

BRC-­‐TAG-­‐7-­‐130

$18,750 $18,000 7 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$37,500 COMM_Key

Bucks Morrisville  Borough Manor  Park  South KEY-­‐PRD-­‐1-­‐89

$40,000 $40,000 1 Park  Rehabilitation  and  Development  (COMM)

$82,000 COMM_Key

Bucks Natural  Lands  Trust,  Inc.  

Jahnke  Property  Acquisition

BRC-­‐LTA-­‐12-­‐18

$370,000 $370,000 12 Open  Space  Acquisition  (LT)

$740,000 LT_Key

Page 106: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  106  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Bucks Natural  Lands  Trust,  Inc.  

Matczak  Property BRC-­‐LTA-­‐7-­‐14

$176,650 $225,000 7 Critical  Habitat  Acquisition  (LT)

$450,000 LT_Key

Bucks Natural  Lands  Trust,  Inc.  

Neshaminy  Addition BRC-­‐LTA-­‐6-­‐17

$75,000 $50,000 6 Critical  Habitat  Acquisition  (LT)

$150,000 LT_Key

Bucks New  Britain  Township

West  Branch  Park  Master  Site  Plan

BRC-­‐TAG-­‐12-­‐255

$33,000 $33,000 12 Master  Site  Plans  (COMM)

$66,000 COMM_Key

Bucks New  Britain  Township

West  Branch  Park-­‐  Phase  I-­‐  Development

BRC-­‐PRD-­‐16-­‐149

$223,560 $197,400 16 Park  Rehabilitation  and  Development  (COMM)

$447,120 COMM_Key

Bucks New  Hope  Borough Ferry  Street  Park  Development

BRC-­‐PRD-­‐12-­‐176

$120,000 $120,000 12 Park  Rehabilitation  and  Development  (COMM)

$262,000 COMM_Key

Bucks Newtown  Borough Linton  Memorial  Park

KEY-­‐SC-­‐5-­‐148

$20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$54,800 COMM_Key

Bucks Newtown  Borough Newtown  Creek  Watershed  Conservation  Plan

BRC-­‐RCP-­‐14-­‐286

$12,100 $12,100 14 Planning  (RIV) $24,200 RIVER_Key

Bucks Newtown  Township Multi-­‐park  Master  Site  Plan

KEY-­‐TAG-­‐4-­‐114

$20,000 $20,000 4 Master  Site  Plans  (COMM)

$40,000 COMM_Key

Bucks Newtown  Township Nature  Preserve KEY-­‐ACQ-­‐4-­‐115

$100,000 $100,000 4 Acquisition  (COMM)

$1,102,000 COMM_Key

Page 107: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  107  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Bucks Northampton Township Civic Center 1 Recreation Complex- Phase 1- Development

BRC-PRD-19-208

$250,000.00 $250,000.00 19 Park Rehabilitation and Development (COMM)

$876,600.00 COMM_Key

Bucks Northampton Township Civic Center 1 Recreation Complex- Phase 1- Development

BRC-PRD-19-208

$250,000.00 $250,000.00 19 Park Rehabilitation and Development (COMM)

$876,600.00 COMM_Key

Bucks Northampton Township Civic Center 1 Recreation Complex- Phase 1- Development

BRC-PRD-19-208

$250,000.00 $250,000.00 19 Park Rehabilitation and Development (COMM)

$876,600.00 COMM_Key

Bucks Northampton  Township

Comprehensive  Rec.,  Park  &  Open  Space  Pl

KEY-­‐TAG-­‐3-­‐159

$12,500 $12,500 3 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$25,000 COMM_Key

Bucks Northampton  Township

Comprehensive  Recreation  and  Park  Plan

BRC-­‐TAG-­‐16-­‐66

$22,500 $22,500 16 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$45,000 COMM_Key

Bucks Partnership  for  Land  Use  Management  

Paunacussing  Creek  Watershed  Plan

BRC-­‐RCP-­‐6-­‐4

$23,000 $23,000 6 Planning  (RIV) $51,700 RIVER_Key

Bucks Penndel  Borough Memorial  Field  Recreation  Complex  -­‐Phase-­‐2-­‐  -­‐  Development

BRC-­‐PRD-­‐18-­‐89

$125,000 $125,000 18 Park  Rehabilitation  and  Development  (COMM)

$250,000 COMM_Key

Page 108: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  108  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Bucks Penndel  Borough Penndel  Recreation  Field

BRC-­‐SC-­‐6-­‐141

$19,600 $19,600 6 Small  Communities/Small  Projects  (COMM)

$19,600 COMM_Key

Bucks Perkasie  Borough Lenape  Park  Expansion

KEY-­‐ACQ-­‐3-­‐167

$19,500 $10,000 3 Acquisition  (COMM)

$39,000 COMM_Key

Bucks Perkasie  Borough Lenape  Park  Expansion-­‐Phase  One

BRC-­‐PRD-­‐8-­‐151

$301,400 $150,000 8 Park  Rehabilitation  and  Development  (COMM)

$627,900 COMM_Key

Bucks Perkasie  Borough Perkiomen  Bike  Path KEY-­‐PRD-­‐2-­‐118

$138,600 $125,000 2 Park  Rehabilitation  and  Development  (COMM)

$277,200 COMM_Key

Bucks Plumstead  Township Community  Park KEY-­‐ACQ-­‐3-­‐178

$100,000 $100,000 3 Acquisition  (COMM)

$200,000 COMM_Key

Bucks Plumstead  Township Owls  Nest  Park  -­‐Development

BRC-­‐PRD-­‐18-­‐93

$281,900 $280,000 18 Park  Rehabilitation  and  Development  (COMM)

$563,800 COMM_Key

Bucks Quakertown Borough Krupp Park- Phase 2- Development

BRC-PRD-19-106

$250,000.00 $250,000.00 19 Park Rehabilitation and Development (COMM)

$550,000.00 COMM_Key

Page 109: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  109  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Bucks Quakertown Borough Krupp Park- Phase 2- Development

BRC-PRD-19-106

$250,000.00 $250,000.00 19 Park Rehabilitation and Development (COMM)

$550,000.00 COMM_Key

Bucks Quakertown Borough Krupp Park- Phase 2- Development

BRC-PRD-19-106

$250,000.00 $250,000.00 19 Park Rehabilitation and Development (COMM)

$550,000.00 COMM_Key

Bucks Redevelopment  Authority  of  the  County  of  Bucks  

Bristol  Waterfront  Feasibility  Study  and  Master  Site  Plan

BRC-­‐TAG-­‐13.3-­‐487

$78,650 $60,000 13.3 Feasibility  Studies  (COMM)

$157,300 RIVER_Key

Bucks Redevelopment  Authority  of  the  County  of  Bucks  

East  Coast  Greenway  Neshaminy  Creek  Crossing  Project

BRC-­‐TAG-­‐16-­‐82

$35,000 $29,600 16 Greenway  Plans  (COMM)

$70,000 COMM_Key

Bucks Richland  Township Upper  Tohickon  Watershed  Conservation  Plan

BRC-­‐RCP-­‐8-­‐6

$75,000 $50,000 8 Planning  (RIV) $150,000 RIVER_Key

Bucks Richlandtown  Borough

Benner  Hall  Park-­‐-­‐Development

BRC-­‐PRD-­‐16-­‐157

$344,495 $250,000 16 Park  Rehabilitation  and  Development  (COMM)

$689,495 COMM_Key

Bucks Richlandtown  Borough

Benner  Memorial  Park-­‐  Development

BRC-­‐SC-­‐18-­‐40

$31,833 $31,800 18 Small  Communities/Small  Projects  (COMM)

$43,665 COMM_Key

Page 110: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  110  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Bucks Riegelsville  Borough Borough  Park KEY-­‐SC-­‐3-­‐186

$20,000 $20,000 3 Small  Communities/Small  Projects  (COMM)

$26,000 COMM_Key

Bucks Riegelsville  Borough Comp.  Rec.,  Park,  Open  Space  &  Master  Site  Plans

BRC-­‐TAG-­‐14-­‐239

$19,500 $19,500 14 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$39,500 COMM_Key

Bucks Sellersville  Borough Streambank  Rehabilitation  and  Wall  Repair

BRC-­‐RCD-­‐18-­‐165

$69,064 $64,200 18 Development  (RIV)

$138,128 COMM_Key

Bucks Solebury  Township Laurel  Road  Park BRC-­‐PRD-­‐13-­‐143

$250,000 $250,000 13 Park  Rehabilitation  and  Development  (COMM)

$1,691,900 COMM_Key

Bucks Telford Borough Telford Municipal Park - Development

BRC-PRD-19-120

$250,000.00 $250,000.00 19 Park Rehabilitation and Development (COMM)

$708,204.00 COMM_Key

Bucks Telford Borough Telford Municipal Park - Development

BRC-PRD-19-120

$250,000.00 $250,000.00 19 Park Rehabilitation and Development (COMM)

$708,204.00 COMM_Key

Bucks Telford Borough Telford Municipal Park - Development

BRC-PRD-19-120

$250,000.00 $250,000.00 19 Park Rehabilitation and Development (COMM)

$708,204.00 COMM_Key

Page 111: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  111  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Bucks The  Tinicum  Conservancy  

Tohickon  Creek  Greenway  &  Watershed  Plan

BRC-­‐RCP-­‐6-­‐3

$36,000 $39,500 6 Planning  (RIV) $54,000 RIVER_Key

Bucks Tinicum  Township Camp  Onas    Conservation  Easement

BRC-­‐ACQ-­‐9-­‐208

$140,000 $90,000 9 Acquisition  (COMM)

$287,000 COMM_Key

Bucks Tinicum  Township Tinicum  Creek  Watershed  Cons.  Plan

KEY-­‐RCP-­‐95-­‐03

$25,000 $25,000 1 Planning  (RIV) $55,900 RIVER_Key

Bucks Tinicum  Township Tinicum  Township  Park  Master  Site  Plan

BRC-­‐TAG-­‐18-­‐151

$15,000 $15,000 18 Master  Site  Plans  (COMM)

$30,000 COMM_Key

Bucks Upper  Makefield  Township

Bowman's  Tower  Park

KEY-­‐PRD-­‐1-­‐140

$89,647 $89,600 1 Park  Rehabilitation  and  Development  (COMM)

$179,295 COMM_Key

Bucks Upper  Makefield  Township

Brownsburg  and  Lookout  Parks

BRC-­‐PRD-­‐10-­‐140

$250,000 $200,000 10 Park  Rehabilitation  and  Development  (COMM)

$1,194,530 COMM_Key

Bucks Upper  Makefield  Township

Brownsburg  Park BRC-­‐TAG-­‐8-­‐200

$16,500 $16,000 8 Master  Site  Plans  (COMM)

$33,000 COMM_Key

Bucks Upper  Makefield  Township

Washington  Crossing  Gateway  Park

BRC-­‐PRD-­‐11-­‐94

$160,000 $160,000 11 Park  Rehabilitation  and  Development  (COMM)

$735,000 COMM_Key

Page 112: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  112  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Bucks Upper  Southampton  Township

Byberry  Realty  Property  Acquisition

BRC-­‐ACQ-­‐8-­‐203

$100,000 $100,000 8 Acquisition  (COMM)

$448,000 COMM_Key

Bucks Upper  Southampton  Township

Park,  Rec.,  &  Open  Space  Plan

BRC-­‐TAG-­‐9-­‐216

$30,000 $30,000 9 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$60,000 COMM_Key

Bucks Upper  Southampton  Township

Peer-­‐to-­‐Peer BRC-­‐TAG-­‐6-­‐6

$5,000 $5,000 6 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$5,500 COMM_Key

Bucks Upper  Southampton  Township

Recreation  Center KEY-­‐PRD-­‐2-­‐160

$100,000 $50,000 2 Park  Rehabilitation  and  Development  (COMM)

$286,400 COMM_Key

Bucks Warminster  Township

Community  Park BRC-­‐PRD-­‐13-­‐152

$150,000 $100,000 13 Park  Rehabilitation  and  Development  (COMM)

$300,000 COMM_Key

Bucks Warminster  Township

NAWC-­‐AD  Master  Site  Plan

BRC-­‐TAG-­‐6-­‐187

$30,000 $30,000 6 Master  Site  Plans  (COMM)

$60,000 COMM_Key

Bucks Warrington  Township

Bradford  Reservoir  Trail

BRC-­‐PRD-­‐13.3-­‐442

$206,250 $200,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$412,500 COMM_Key

Page 113: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  113  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Bucks Warrington  Township

Lower  Nike  Site KEY-­‐PRD-­‐1-­‐143

$57,250 $57,200 1 Park  Rehabilitation  and  Development  (COMM)

$114,500 COMM_Key

Bucks Warrington  Township

Mews  Park KEY-­‐PRD-­‐2-­‐163

$54,324 $50,000 2 Park  Rehabilitation  and  Development  (COMM)

$108,648 COMM_Key

Bucks Warrington  Township

Trail  System  Plan BRC-­‐TAG-­‐9-­‐221

$40,000 $40,000 9 Trail  Study  (COMM)

$80,000 COMM_Key

Bucks Warwick  Township Moland  Park KEY-­‐ACQ-­‐2-­‐164

$433,386 $175,000 2 Acquisition  (COMM)

$866,773 COMM_Key

Bucks Warwick  Township Warwick  Community  Park

KEY-­‐PRD-­‐5-­‐212

$52,500 $52,500 5 Park  Rehabilitation  and  Development  (COMM)

$130,000 COMM_Key

Bucks Warwick  Township Warwick  Township  CRPOS  Plan

BRC-­‐TAG-­‐11-­‐237

$15,000 $15,000 11 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$30,000 COMM_Key

Bucks West  Rockhill  Township

James  Memorial  Park

KEY-­‐SC-­‐3-­‐235

$12,600 $12,600 3 Small  Communities/Small  Projects  (COMM)

$15,600 COMM_Key

Bucks Wildlands  Conservancy,  Inc.  

Washington  Crossing  Tract

KEY-­‐LTA-­‐5-­‐24

$800,000 $750,000 5 Open  Space  Acquisition  (LT)

$2,414,600 LT_Key

Page 114: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  114  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Bucks Wrightstown  Township

Anchor  Run  Park BRC-­‐SC-­‐9-­‐235

$40,000 $20,000 9 Small  Communities/Small  Projects  (COMM)

$71,000 COMM_Key

Bucks Wrightstown  Township

Open  Space  Preserve BRC-­‐TAG-­‐6-­‐203

$10,000 $10,000 6 Master  Site  Plans  (COMM)

$20,000 COMM_Key

Bucks Yardley  Borough Buttonwood  Park,  Phases  II  &  III

BRC-­‐PRD-­‐8-­‐223

$203,000 $100,000 8 Park  Rehabilitation  and  Development  (COMM)

$407,300 COMM_Key

Bucks Yardley  Borough Lake  Afton  to  Veteran’s  Memorial  Park  Trail  -­‐  Development

BRC-­‐PRD-­‐17-­‐162

$112,000 $80,000 17 Park  Rehabilitation  and  Development  (COMM)

$1,085,500 COMM_Key

Bucks Yardley  Borough Yardley  Pedestrian  Plaza

KEY-­‐PRD-­‐5-­‐229

$75,000 $75,000 5 Park  Rehabilitation  and  Development  (COMM)

$150,000 COMM_Key

Bucks,  Delaware,  Philadelphia

Pennsylvania  Environmental  Council,  Inc.  

Tidal  Delaware  Water  Trail  Implementation  2012

BRC-­‐RCI-­‐17-­‐165

$20,000 $20,000 17 Implementation  (RIV)

$45,590 RIVER_Key

Bucks,  Monroe,  Northampton,  Pike,  Wayne

Delaware  River  Greenway  Partnership  

Delaware  River  Water  Trail  Implementation  Phase  2

BRC-­‐RCI-­‐13-­‐13

$45,000 $45,000 13 Implementation  (RIV)

$90,000 RIVER_Key

Page 115: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  115  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Bucks,  Montgomery

Heritage  Conservancy  

Riparian  Buffer  Assessment  Update  for  Southeastern  PA

BRC-­‐RCI-­‐16-­‐176

$20,284 $13,700 16 Implementation  (RIV)

$57,576 RIVER_Key

Bucks,  Montgomery,  Philadelphia

Philadelphia  Water  Department  

River  Conservation  Plan  -­‐  Poquessing  Creek

BRC-­‐RCP-­‐10-­‐9

$100,000 $75,000 10 Planning  (RIV) $210,197 RIVER_Key

Bucks,  Northampton

Heritage  Conservancy  

Seifert-­‐Ray  Property  Conservation  Easement

BRC-­‐LTA-­‐12-­‐19

$215,600 $215,000 12 Open  Space  Acquisition  (LT)

$469,000 LT_Key

Bucks,  Northampton

Heritage  Conservancy  

Watershed-­‐based  Internet  Mapping  for  Cooks  Creek

BRC-­‐RCI-­‐9-­‐9 $24,700 $20,000 9 Implementation  (RIV)

$49,500 RIVER_Key

Bucks, Philadelphia

Pennsylvania Environmental Council, Inc.

Tidal Delaware Stewardship Plan

BRC-TAG-19-141

$124,960.00 $100,000.00 19 Conservation/Sound Land Use (COMM)

$249,960.00 LT_Key

Bucks, Philadelphia

Pennsylvania Environmental Council, Inc.

Tidal Delaware Stewardship Plan

BRC-TAG-19-141

$124,960.00 $100,000.00 19 Conservation/Sound Land Use (COMM)

$249,960.00 LT_Key

Bucks, Philadelphia

Pennsylvania Environmental Council, Inc.

Tidal Delaware Stewardship Plan

BRC-TAG-19-141

$124,960.00 $100,000.00 19 Conservation/Sound Land Use (COMM)

$249,960.00 LT_Key

Bucks, Philadelphia

Pennsylvania Environmental Council, Inc.

Tidal Delaware Stewardship Plan

BRC-TAG-19-141

$124,960.00 $100,000.00 19 Conservation/Sound Land Use (COMM)

$249,960.00 LT_Key

Bucks, Philadelphia

Pennsylvania Environmental Council, Inc.

Tidal Delaware Stewardship Plan

BRC-TAG-19-141

$124,960.00 $100,000.00 19 Conservation/Sound Land Use (COMM)

$249,960.00 LT_Key

Bucks, Philadelphia

Pennsylvania Environmental Council, Inc.

Tidal Delaware Stewardship Plan

BRC-TAG-19-141

$124,960.00 $100,000.00 19 Conservation/Sound Land Use (COMM)

$249,960.00 LT_Key

Bucks, Philadelphia

Pennsylvania Environmental Council, Inc.

Tidal Delaware Stewardship Plan

BRC-TAG-19-141

$124,960.00 $100,000.00 19 Conservation/Sound Land Use (COMM)

$249,960.00 LT_Key

Page 116: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  116  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Butler Adams  Township Community  Park KEY-­‐ACQ-­‐3-­‐5

$112,500 $100,000 3 Acquisition  (COMM)

$225,000 COMM_Key

Butler Adams  Township Community  Park KEY-­‐PRD-­‐5-­‐3

$100,000 $100,000 5 Park  Rehabilitation  and  Development  (COMM)

$225,000 COMM_Key

Butler Adams  Township Community  Park  -­‐  Phase  I

KEY-­‐PRD-­‐4-­‐5

$150,000 $100,000 4 Park  Rehabilitation  and  Development  (COMM)

$359,750 COMM_Key

Butler Adams  Township Comp  Rec  &  Pk  Plan BRC-­‐TAG-­‐11-­‐190

$45,000 $45,000 11 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$90,000 COMM_Key

Butler Bruin  Borough Community  Park BRC-­‐SC-­‐6-­‐26

$20,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$23,000 COMM_Key

Butler Buffalo  Township Butler-­‐Freeport  Community  Trail

KEY-­‐RTD-­‐4-­‐7

$27,100 $27,100 4 Rail  Rehabilitation  and  Development  (RT)

$54,200 RT_Key

Butler Buffalo  Township Butler/Freeport  Community  Trail  Development

BRC-­‐PRD-­‐14-­‐370

$250,000 $195,000 14 Park  Rehabilitation  and  Development  (COMM)

$555,600 COMM_Key

Page 117: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  117  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Butler Buffalo  Township Ford  Property  Acquisition

BRC-­‐ACQ-­‐16-­‐20

$90,000 $90,000 16 Acquisition  (COMM)

$180,000 COMM_Key

Butler Butler  City Butler  Rotary  Park  Trail  -­‐  Development

BRC-­‐PRD-­‐16-­‐125

$154,000 $154,000 16 Park  Rehabilitation  and  Development  (COMM)

$309,520 COMM_Key

Butler Butler  City Comp  Rec,  Park  &  Open  Space  Plan,  Master  Site  Plan

BRC-­‐TAG-­‐8-­‐30

$30,000 $30,000 8 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$70,000 COMM_Key

Butler Butler  County Alameda  County  Park  -­‐  Phase  3  -­‐  Development

BRC-­‐PRD-­‐17-­‐109

$125,000 $125,000 17 Park  Rehabilitation  and  Development  (COMM)

$250,000 COMM_Key

Butler Butler  County Alameda  Park  -­‐  Pool  Renovation

KEY-­‐PRD-­‐3-­‐29

$260,000 $250,000 3 Park  Rehabilitation  and  Development  (COMM)

$540,700 COMM_Key

Butler Butler County Alameda Park-Development

BRC-PRD-19-63

$400,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)

$900,000.00 COMM_Key

Butler Butler County Alameda Park-Development

BRC-PRD-19-63

$400,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)

$900,000.00 COMM_Key

Page 118: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  118  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Butler Butler County Alameda Park-Development

BRC-PRD-19-63

$400,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)

$900,000.00 COMM_Key

Butler Butler County Alameda Park-Development

BRC-PRD-19-63

$400,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)

$900,000.00 COMM_Key

Butler Butler County Alameda Park-Development

BRC-PRD-19-63

$400,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)

$900,000.00 COMM_Key

Butler Butler County Alameda Park-Development

BRC-PRD-19-63

$400,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)

$900,000.00 COMM_Key

Butler Butler County Alameda Park-Development

BRC-PRD-19-63

$400,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)

$900,000.00 COMM_Key

Butler Butler County Alameda Park-Development

BRC-PRD-19-63

$400,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)

$900,000.00 COMM_Key

Butler Butler County Alameda Park-Development

BRC-PRD-19-63

$400,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)

$900,000.00 COMM_Key

Page 119: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  119  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Butler Butler County Alameda Park-Development

BRC-PRD-19-63

$400,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)

$900,000.00 COMM_Key

Butler Butler  County Butler  County  &  Cranberry  Township  Recreation  Planning

BRC-­‐TAG-­‐15-­‐87

$125,000 $142,500 15 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$250,000 COMM_Key

Butler Butler  County Community  College  Park

BRC-­‐PRD-­‐6-­‐27

$150,000 $100,000 6 Park  Rehabilitation  and  Development  (COMM)

$390,000 COMM_Key

Butler Butler  County Comprehensive  Recreation  &  Park  Plan

KEY-­‐TAG-­‐1-­‐25

$50,000 $50,000 1 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$100,000 COMM_Key

Butler Butler  County Conduit  Grant BRC-­‐PRD-­‐7-­‐29

$100,000 $100,000 7 Park  Rehabilitation  and  Development  (COMM)

$131,600 COMM_Key

Butler Butler  County Diamond  Park KEY-­‐PRD-­‐4-­‐22

$90,000 $90,000 4 Park  Rehabilitation  and  Development  (COMM)

$204,200 COMM_Key

Page 120: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  120  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Butler Butler  County Special  Kids  Zone  Playground

BRC-­‐PRD-­‐11-­‐14

$100,000 $50,000 11 Park  Rehabilitation  and  Development  (COMM)

$330,000 COMM_Key

Butler Butler  Township Duffy  Road  Park BRC-­‐PRD-­‐11-­‐15

$97,700 $97,700 11 Park  Rehabilitation  and  Development  (COMM)

$195,300 COMM_Key

Butler Butler  Township Master  Site  Plans  for  Preston  &  Butler  Township  Parks

BRC-­‐TAG-­‐17-­‐4

$30,000 $30,000 17 Master  Site  Plans  (COMM)

$60,000 COMM_Key

Butler Butler  Township Multi-­‐Municipal  CRPP

BRC-­‐TAG-­‐13.3-­‐461

$61,400 $61,400 13.3 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$122,800 COMM_Key

Butler Center  Township Township  Park BRC-­‐PRD-­‐13-­‐348

$20,000 $20,000 13 Park  Rehabilitation  and  Development  (COMM)

$40,000 COMM_Key

Butler Chicora  Borough Community  Park BRC-­‐SC-­‐13-­‐293

$28,000 $27,000 13 Small  Communities/Small  Projects  (COMM)

$35,000 COMM_Key

Butler Clay  Township Community  Park  -­‐  Development

BRC-­‐SC-­‐17-­‐31

$32,000 $32,000 17 Small  Communities/Small  Projects  (COMM)

$44,000 COMM_Key

Page 121: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  121  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Butler Clay  Township Township  Park KEY-­‐SC-­‐2-­‐29 $20,000 $20,000 2 Small  Communities/Small  Projects  (COMM)

$23,000 COMM_Key

Butler Clearfield  Township Clearfield  Elementary  Park

KEY-­‐SC-­‐2-­‐31 $20,000 $20,000 2 Small  Communities/Small  Projects  (COMM)

$23,100 COMM_Key

Butler Clinton  Township Clinton  &  Buffalo  Twps  Greenway/Mini  Comp  Plan

BRC-­‐TAG-­‐12-­‐231

$46,000 $46,000 12 Greenway  Plans  (COMM)

$93,100 COMM_Key

Butler Clinton  Township Spring  Valley  Park BRC-­‐PRD-­‐11-­‐20

$189,300 $100,000 11 Park  Rehabilitation  and  Development  (COMM)

$385,600 COMM_Key

Butler Clinton  Township Spring  Valley  Park BRC-­‐TAG-­‐9-­‐52

$15,000 $15,000 9 Master  Site  Plans  (COMM)

$30,000 COMM_Key

Butler Connoquenessing  Borough

Community  Park KEY-­‐SC-­‐3-­‐40 $20,000 $20,000 3 Small  Communities/Small  Projects  (COMM)

$22,200 COMM_Key

Butler Cranberry  Township Brush  Creek  Trail  Phase  1  -­‐  Graham  Park  Trail  Extension  -­‐  Development

BRC-­‐PRD-­‐18-­‐173

$144,788 $90,000 18 Park  Rehabilitation  and  Development  (COMM)

$180,986 COMM_Key

Page 122: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  122  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Butler Cranberry  Township Cranberry  Community  Park

BRC-­‐PRD-­‐6-­‐45

$153,300 $70,000 6 Park  Rehabilitation  and  Development  (COMM)

$306,600 COMM_Key

Butler Cranberry  Township Township  Pool KEY-­‐PRD-­‐2-­‐33

$200,000 $200,000 2 Park  Rehabilitation  and  Development  (COMM)

$1,295,000 COMM_Key

Butler East  Butler  Borough Brandon  and  Firehall  Parks-­‐  Development

BRC-­‐SC-­‐18-­‐29

$32,000 $32,000 18 Small  Communities/Small  Projects  (COMM)

$44,000 COMM_Key

Butler East  Butler  Borough East  Butler  Park KEY-­‐SC-­‐1-­‐40 $20,000 $20,000 1 Small  Communities/Small  Projects  (COMM)

$21,630 COMM_Key

Butler Eau  Claire  Borough Community  Park  -­‐  Development

BRC-­‐SC-­‐17-­‐33

$28,000 $28,000 17 Small  Communities/Small  Projects  (COMM)

$36,000 COMM_Key

Butler Eau  Claire  Borough Eau  Claire  Community  Park  Acquisition

BRC-­‐ACQ-­‐10-­‐180

$11,000 $11,000 10 Acquisition  (COMM)

$22,000 COMM_Key

Butler Evans  City  Borough Community  Park KEY-­‐SC-­‐5-­‐64 $20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$23,000 COMM_Key

Page 123: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  123  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Butler Fairview  Borough Borough  Park BRC-­‐SC-­‐14-­‐83

$28,000 $28,000 14 Small  Communities/Small  Projects  (COMM)

$36,000 COMM_Key

Butler Fairview  Borough Playground  Rehab BRC-­‐SC-­‐11-­‐122

$27,000 $27,000 11 Small  Communities/Small  Projects  (COMM)

$34,000 COMM_Key

Butler Fairview  Township Fairview  Township  Community  Park

BRC-­‐SC-­‐10-­‐77

$40,000 $40,000 10 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Butler Harmony  Borough Eichenauer  Property KEY-­‐ACQ-­‐5-­‐81

$16,000 $16,000 5 Acquisition  (COMM)

$32,000 COMM_Key

Butler Harrisville  Borough Community  Park KEY-­‐SC-­‐1-­‐57 $20,000 $20,000 1 Small  Communities/Small  Projects  (COMM)

$23,350 COMM_Key

Butler Harrisville  Borough Community  Park  -­‐  Phase  II

BRC-­‐SC-­‐14-­‐89

$26,000 $26,000 14 Small  Communities/Small  Projects  (COMM)

$32,000 COMM_Key

Butler Harrisville  Borough Harrisville  Community  Park

BRC-­‐SC-­‐9-­‐89

$27,000 $27,000 9 Small  Communities/Small  Projects  (COMM)

$34,000 COMM_Key

Butler Jefferson  Township Doerr  Park  Master  Site  Development  Plan

BRC-­‐TAG-­‐11-­‐213

$15,000 $15,000 11 Master  Site  Plans  (COMM)

$30,000 COMM_Key

Page 124: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  124  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Butler Jefferson  Township Laura  Doerr  Memorial  Park  Pool

BRC-­‐PRD-­‐13-­‐110

$75,000 $75,000 13 Park  Rehabilitation  and  Development  (COMM)

$150,000 COMM_Key

Butler Jefferson Township Laura J. Doerr Memerial Park-Development

BRC-PRD-19-86

$95,000.00 $95,000.00 19 Park Rehabilitation and Development (COMM)

$200,000.00 COMM_Key

Butler Jefferson Township Laura J. Doerr Memerial Park-Development

BRC-PRD-19-86

$95,000.00 $95,000.00 19 Park Rehabilitation and Development (COMM)

$200,000.00 COMM_Key

Butler Jefferson Township Laura J. Doerr Memerial Park-Development

BRC-PRD-19-86

$95,000.00 $95,000.00 19 Park Rehabilitation and Development (COMM)

$200,000.00 COMM_Key

Butler Karns  City  Borough McCollough  Park  Rehab

BRC-­‐SC-­‐11-­‐131

$27,000 $27,000 11 Small  Communities/Small  Projects  (COMM)

$34,000 COMM_Key

Butler Lancaster  Township Lancaster  Township  Park  Master  Site  Plan

BRC-­‐TAG-­‐18-­‐147

$15,000 $15,000 18 Master  Site  Plans  (COMM)

$30,000 COMM_Key

Butler Marion  Township Community  Park KEY-­‐SC-­‐4-­‐95 $20,000 $20,000 4 Small  Communities/Small  Projects  (COMM)

$22,000 COMM_Key

Page 125: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  125  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Butler Marion Township Township Park-Development

BRC-SC-19-44

$35,000.00 $35,000.00 19 Small Communities/Small Projects (COMM)

$50,000.00 COMM_Key

Butler Marion Township Township Park-Development

BRC-SC-19-44

$35,000.00 $35,000.00 19 Small Communities/Small Projects (COMM)

$50,000.00 COMM_Key

Butler Marion Township Township Park-Development

BRC-SC-19-44

$35,000.00 $35,000.00 19 Small Communities/Small Projects (COMM)

$50,000.00 COMM_Key

Butler Mars  Borough Clay  Avenue  Park-­‐  Development

BRC-­‐SC-­‐18-­‐35

$35,000 $35,000 18 Small  Communities/Small  Projects  (COMM)

$50,000 COMM_Key

Butler Mars  Borough Garfield  Playground KEY-­‐SC-­‐3-­‐127

$20,000 $20,000 3 Small  Communities/Small  Projects  (COMM)

$22,000 COMM_Key

Butler Mars  Borough Mars  Athletic  Field BRC-­‐PRD-­‐6-­‐107

$60,600 $60,000 6 Park  Rehabilitation  and  Development  (COMM)

$121,200 COMM_Key

Butler Middlesex  Township Parks  &  Rec.  Comp.  &  Master  Site  Dvlpmnt.  Plans

BRC-­‐TAG-­‐11-­‐223

$30,000 $30,000 11 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$60,000 COMM_Key

Butler Middlesex  Township Tennis/Basketball  Court

BRC-­‐SC-­‐7-­‐128

$20,700 $20,000 7 Small  Communities/Small  Projects  (COMM)

$41,400 COMM_Key

Page 126: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  126  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Butler Penn  Township Hertzell  Property  Acquisition

BRC-­‐ACQ-­‐12-­‐277

$237,500 $237,000 12 Acquisition  (COMM)

$474,000 COMM_Key

Butler Petrolia  Borough Petrolia  Park KEY-­‐SC-­‐3-­‐170

$20,000 $20,000 3 Small  Communities/Small  Projects  (COMM)

$21,850 COMM_Key

Butler Petrolia Borough Petrolia Park-Development

BRC-SC-19-45

$28,000.00 $28,000.00 19 Small Communities/Small Projects (COMM)

$36,000.00 COMM_Key

Butler Petrolia Borough Petrolia Park-Development

BRC-SC-19-45

$28,000.00 $28,000.00 19 Small Communities/Small Projects (COMM)

$36,000.00 COMM_Key

Butler Petrolia Borough Petrolia Park-Development

BRC-SC-19-45

$28,000.00 $28,000.00 19 Small Communities/Small Projects (COMM)

$36,000.00 COMM_Key

Butler Portersville  Borough Community  Park KEY-­‐SC-­‐3-­‐180

$20,000 $20,000 3 Small  Communities/Small  Projects  (COMM)

$22,500 COMM_Key

Butler Seven  Fields  Borough

Nature  Preserve BRC-­‐SC-­‐11-­‐153

$33,900 $33,000 11 Small  Communities/Small  Projects  (COMM)

$47,800 COMM_Key

Butler Slippery  Rock  Borough

Community  Park BRC-­‐SC-­‐11-­‐156

$40,000 $40,000 11 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Page 127: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  127  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Butler Slippery  Rock  Borough

Community  Park KEY-­‐SC-­‐2-­‐141

$19,500 $19,500 2 Small  Communities/Small  Projects  (COMM)

$23,000 COMM_Key

Butler Slippery  Rock  Borough

Multi-­‐municipal  Comp.  Rec.,  Park  &  Open  Space  Plan  and  MSDP

BRC-­‐TAG-­‐13-­‐494

$70,000 $70,000 13 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$147,000 COMM_Key

Butler Slippery  Rock  Borough

Multi-­‐Purpose  Athletic  Fields

BRC-­‐SC-­‐9-­‐189

$40,000 $40,000 9 Small  Communities/Small  Projects  (COMM)

$61,600 COMM_Key

Butler Winfield  Township Community  Park-­‐Development

BRC-­‐SC-­‐16-­‐51

$40,000 $40,000 16 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Butler Winfield  Township Master  Site  Development  Plan

KEY-­‐TAG-­‐3-­‐242

$12,500 $12,500 3 Master  Site  Plans  (COMM)

$25,000 COMM_Key

Butler Winfield  Township Winfield  Community  Park

BRC-­‐SC-­‐12-­‐129

$40,000 $40,000 12 Small  Communities/Small  Projects  (COMM)

$65,900 COMM_Key

Butler Winfield Township Winfield Township Community Park-Development

BRC-SC-19-56

$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)

$60,000.00 COMM_Key

Butler Winfield Township Winfield Township Community Park-Development

BRC-SC-19-56

$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)

$60,000.00 COMM_Key

Page 128: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  128  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Butler Winfield Township Winfield Township Community Park-Development

BRC-SC-19-56

$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)

$60,000.00 COMM_Key

Butler Zelienople  Borough Zelienople  Community  Park  Master  Plan

BRC-­‐TAG-­‐12-­‐268

$26,000 $26,000 12 Master  Site  Plans  (COMM)

$52,000 COMM_Key

Butler,  Montgomery

Mars  Borough Garfield  Playground BRC-­‐SC-­‐7-­‐120

$30,000 $30,000 7 Small  Communities/Small  Projects  (COMM)

$42,800 COMM_Key

Cambria Adams  Township-­‐Croyle  Township  Recreation  Authority  

Park  of  1889  Development

BRC-­‐PRD-­‐12-­‐130

$60,000 $60,000 12 Park  Rehabilitation  and  Development  (COMM)

$120,700 COMM_Key

Cambria Ashville  Borough Ashville  Park KEY-­‐SC-­‐5-­‐8 $20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$22,025 COMM_Key

Cambria Blacklick  Township Community  Park  (aka)  Veteran's  Memorial  Park

BRC-­‐PRD-­‐13-­‐91

$186,300 $125,000 13 Park  Rehabilitation  and  Development  (COMM)

$372,600 COMM_Key

Cambria Blacklick  Township Municipal  Park  Master  Plan

BRC-­‐TAG-­‐9-­‐22

$10,000 $7,500 9 Master  Site  Plans  (COMM)

$20,000 COMM_Key

Page 129: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  129  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Cambria Cambria  County Duman  Lake  County  Park

BRC-­‐PRD-­‐6-­‐28

$97,100 $90,000 6 Park  Rehabilitation  and  Development  (COMM)

$194,200 COMM_Key

Cambria Cambria  County  Conservation  and  Recreation  Authority  

Cambria  &  Indiana  (C  and  I)  /Ghost  Town  Trail  Net.

BRC-­‐RTD-­‐6-­‐3

$210,000 $100,000 6 Rail  Rehabilitation  and  Development  (RT)

$1,525,000 RT_Key

Cambria Cambria  County  Conservation  and  Recreation  Authority  

Circuit  Rider  -­‐  Year  2 KEY-­‐TAG-­‐4-­‐23

$24,300 $24,300 4 Circuit  Rider  (COMM)

$31,800 COMM_Key

Cambria Cambria  County  Conservation  and  Recreation  Authority  

Path  of  the  Flood  Trail

BRC-­‐PRD-­‐10-­‐4

$310,000 $150,000 10 Park  Rehabilitation  and  Development  (COMM)

$3,551,100 COMM_Key

Cambria Cambria  County  Conservation  and  Recreation  Authority  

Rails-­‐to-­‐Trails  Special  Study/Greenway

KEY-­‐TAG-­‐1-­‐27

$24,800 $24,800 1 Feasibility  Studies  (COMM)

$49,600 COMM_Key

Cambria Cambria  County  Conservation  and  Recreation  Authority  

Regional  Conservation  Specialist

KEY-­‐TAG-­‐3-­‐31

$30,000 $30,000 3 Circuit  Rider  (COMM)

$30,000 COMM_Key

Page 130: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  130  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Cambria Cambria  County  Redevelopment  Authority  

Conduit  Grant BRC-­‐PRD-­‐12-­‐133

$115,000 $115,000 12 Park  Rehabilitation  and  Development  (COMM)

$170,000 COMM_Key

Cambria Cambria  County  Redevelopment  Authority  

Conduit  Grant BRC-­‐PRD-­‐7-­‐32

$100,000 $100,000 7 Park  Rehabilitation  and  Development  (COMM)

$100,000 COMM_Key

Cambria Cambria  County  Redevelopment  Authority  

County  Playground  Safety  Audit  &  Inspection

BRC-­‐TAG-­‐8-­‐33

$18,000 $10,000 8 Education  and  Training  (COMM)

$20,000 COMM_Key

Cambria Cambria  County  Redevelopment  Authority  

Demonstration  Playground  Conduit  Grant

BRC-­‐PRD-­‐9-­‐174

$90,000 $90,000 9 Park  Rehabilitation  and  Development  (COMM)

$100,000 COMM_Key

Cambria Cambria  County  Transit  Authority  

Inclined  Plane KEY-­‐PRD-­‐1-­‐28

$15,000 $15,000 1 Park  Rehabilitation  and  Development  (COMM)

$150,000 COMM_Key

Cambria Cambria  Somerset  Authority  

Wilmore  Resevoir  -­‐  Patrick's  Road  Property  Acq.

BRC-­‐ACQ-­‐10-­‐175

$61,450 $59,000 10 Acquisition  (COMM)

$122,900 COMM_Key

Cambria Carrolltown  Borough Stoltz  Pond  -­‐  Development

BRC-­‐SC-­‐17-­‐29

$36,500 $36,500 17 Small  Communities/Small  Projects  (COMM)

$53,000 COMM_Key

Page 131: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  131  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Cambria Cassandra  Borough Derby  Park KEY-­‐SC-­‐3-­‐33 $20,000 $20,000 3 Small  Communities/Small  Projects  (COMM)

$28,500 COMM_Key

Cambria Conemaugh  Township

Conemaugh  Valley  Ballfield  Rehab/Soccer  Install

BRC-­‐SC-­‐11-­‐113

$39,000 $39,000 11 Small  Communities/Small  Projects  (COMM)

$58,000 COMM_Key

Cambria Conemaugh  Township

Two  Sites KEY-­‐SC-­‐5-­‐37 $20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$28,840 COMM_Key

Cambria Conemaugh  Valley  Conservancy,  Inc.  

Kiski-­‐Conemaugh  River  Basin  Cons  Plan

KEY-­‐RCP-­‐96-­‐14

$100,000 $238,000 3 Planning  (RIV) $200,000 RIVER_Key

Cambria Conemaugh  Valley  Conservancy,  Inc.  

West  Penn  Trail  -­‐  Pedestrian  Bridge

BRC-­‐RTD-­‐9-­‐4

$303,000 $300,000 9 Rail  Rehabilitation  and  Development  (RT)

$660,000 RT_Key

Cambria Cresson  Borough Keystone  Avenue  Playground

BRC-­‐SC-­‐6-­‐47

$20,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$21,000 COMM_Key

Cambria Croyle  Township South  Fork-­‐Croyle  Recreation  Area

KEY-­‐SC-­‐3-­‐44 $20,000 $20,000 3 Small  Communities/Small  Projects  (COMM)

$27,500 COMM_Key

Page 132: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  132  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Cambria Dale  Borough C.  K.  Leberknight  Playground

KEY-­‐SC-­‐5-­‐41 $20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$30,473 COMM_Key

Cambria Dean  Township Township  Park BRC-­‐SC-­‐6-­‐49

$20,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$21,500 COMM_Key

Cambria East  Conemaugh  Borough

Two  Sites KEY-­‐SC-­‐5-­‐53 $20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$20,890 COMM_Key

Cambria East  Taylor  Township

Mineral  Point  Village  Playground

BRC-­‐SC-­‐13-­‐298

$25,000 $20,000 13 Small  Communities/Small  Projects  (COMM)

$30,000 COMM_Key

Cambria Ebensburg  Borough Center  Ward  Playground

BRC-­‐SC-­‐10-­‐75

$20,000 $20,000 10 Small  Communities/Small  Projects  (COMM)

$49,170 COMM_Key

Cambria Ebensburg  Borough Circuit  Rider BRC-­‐TAG-­‐11-­‐259

$7,560 $7,560 11 Circuit  Rider  (COMM)

$30,240 COMM_Key

Cambria Ebensburg  Borough Downtown  Gateway  Parklet  Acquisition

BRC-­‐ACQ-­‐13.3-­‐275

$150,000 $150,000 13.3 Acquisition  (COMM)

$300,000 COMM_Key

Cambria Ebensburg  Borough East  Ward  Playground

KEY-­‐SC-­‐2-­‐43 $20,000 $20,000 2 Small  Communities/Small  Projects  (COMM)

$26,050 COMM_Key

Page 133: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  133  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Cambria Ebensburg  Borough Ebensburg  Skate  Park

BRC-­‐PRD-­‐11-­‐28

$188,400 $100,000 11 Park  Rehabilitation  and  Development  (COMM)

$376,900 COMM_Key

Cambria Ebensburg  Borough Ebensburg  Swimming  Pool-­‐Development

BRC-­‐PRD-­‐16-­‐131

$300,000 $300,000 16 Park  Rehabilitation  and  Development  (COMM)

$1,044,850 COMM_Key

Cambria Ebensburg  Borough Penn-­‐Eben  Park BRC-­‐PRD-­‐13.3-­‐356

$125,000 $125,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$250,000 COMM_Key

Cambria Ehrenfeld  Borough Borough  Park  -­‐  Phase  I

KEY-­‐SC-­‐1-­‐45 $20,000 $20,000 1 Small  Communities/Small  Projects  (COMM)

$37,000 COMM_Key

Cambria Franklin  Borough Franklin  Ballfield KEY-­‐SC-­‐5-­‐68 $20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$21,000 COMM_Key

Cambria Gallitzin  Borough North  Main  Street  Playground

BRC-­‐SC-­‐10-­‐79

$40,000 $40,000 10 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Cambria Hastings  Borough Borough  Park KEY-­‐SC-­‐2-­‐60 $18,500 $18,500 2 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Page 134: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  134  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Cambria Hastings  Borough Peer-­‐to-­‐Peer KEY-­‐TAG-­‐1-­‐153

$6,750 $4,000 1 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$7,522 COMM_Key

Cambria Hastings  Borough Walking  Trail BRC-­‐RTD-­‐6-­‐12

$20,000 $10,000 6 Rail  Rehabilitation  and  Development  (RT)

$40,000 RT_Key

Cambria Jackson  Township Comp  Rec,  Pk,  Open  Space  Study

BRC-­‐TAG-­‐11-­‐211

$25,000 $25,000 11 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$50,000 COMM_Key

Cambria Jackson  Township Marhefka  Land  Acquisition  (Leidy  Park  Addition)

BRC-­‐ACQ-­‐14-­‐60

$77,000 $74,500 14 Acquisition  (COMM)

$154,000 COMM_Key

Cambria Jackson  Township Mitchell  Park  -­‐  Phase  I

BRC-­‐PRD-­‐13.3-­‐546

$123,600 $123,600 13.3 Park  Rehabilitation  and  Development  (COMM)

$411,600 COMM_Key

Cambria Johnstown  City Comprehensive  Recreation  &  Park  Plan

KEY-­‐TAG-­‐1-­‐65

$20,000 $20,000 1 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$40,000 COMM_Key

Cambria Johnstown  City Johnstown  Greenway  and  Open  Space  Plan

BRC-­‐TAG-­‐12-­‐238

$37,500 $37,500 12 Master  Site  Plans  (COMM)

$75,500 COMM_Key

Page 135: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  135  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Cambria Johnstown  City Multiple  Sites KEY-­‐PRD-­‐5-­‐99

$200,000 $150,000 5 Park  Rehabilitation  and  Development  (COMM)

$400,000 COMM_Key

Cambria Johnstown  City Oakhurst  Playground  -­‐  Development

BRC-­‐PRD-­‐17-­‐127

$90,000 $90,000 17 Park  Rehabilitation  and  Development  (COMM)

$180,000 COMM_Key

Cambria Johnstown  City Point  Stadium BRC-­‐PRD-­‐13-­‐111

$401,000 $150,000 13 Park  Rehabilitation  and  Development  (COMM)

$802,000 COMM_Key

Cambria Johnstown  City Roxbury  Park BRC-­‐PRD-­‐8-­‐234

$73,500 $73,500 8 Park  Rehabilitation  and  Development  (COMM)

$147,000 COMM_Key

Cambria Johnstown  City Somerset  Street  Intergenerational  Park-­‐  Development

BRC-­‐PRD-­‐16-­‐141

$34,000 $34,000 16 Park  Rehabilitation  and  Development  (COMM)

$68,000 COMM_Key

Cambria Johnstown  City Urban  Greenway  Pedestrian  Bridge

BRC-­‐PRD-­‐11-­‐48

$468,600 $141,000 11 Park  Rehabilitation  and  Development  (COMM)

$937,300 COMM_Key

Page 136: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  136  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Cambria Johnstown  Redevelopment  Authority  

Cambria  Iron  &  Steel  Ped.  Trail  Footbridge  Study

BRC-­‐TAG-­‐8-­‐97

$30,000 $15,000 8 Feasibility  Studies  (COMM)

$60,000 COMM_Key

Cambria Johnstown  Redevelopment  Authority  

Cambria  Iron  &  Steel  Ped.  Trail  Footbridge  Study

BRC-­‐TAG-­‐8-­‐97

$30,000 $30,000 8 Feasibility  Studies  (COMM)

$60,000 COMM_Key

Cambria Johnstown  Redevelopment  Authority  

Johnstown  Gateway  Greenspace  Development

BRC-­‐PRD-­‐12-­‐161

$49,200 $74,200 12 Park  Rehabilitation  and  Development  (COMM)

$134,000 COMM_Key

Cambria Johnstown  Redevelopment  Authority  

Johnstown  Urban  Greenway  Trail

KEY-­‐PRD-­‐5-­‐100

$270,000 $150,000 5 Park  Rehabilitation  and  Development  (COMM)

$540,000 COMM_Key

Cambria Johnstown  Redevelopment  Authority  

Tech  Park  Riverwalk BRC-­‐PRD-­‐14-­‐146

$250,000 $250,000 14 Park  Rehabilitation  and  Development  (COMM)

$500,000 COMM_Key

Cambria Lorain  Borough Borough  Park KEY-­‐SC-­‐4-­‐86 $9,534 $10,000 4 Small  Communities/Small  Projects  (COMM)

$9,534 COMM_Key

Cambria Loretto  Borough McGuire  Park  -­‐  Phase  1-­‐Development

BRC-­‐PRD-­‐18-­‐82

$178,399 $187,000 18 Park  Rehabilitation  and  Development  (COMM)

$365,499 COMM_Key

Page 137: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  137  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Cambria Middle  Taylor  Township

Benshoff  Hill  Park  -­‐  Development

BRC-­‐SC-­‐17-­‐46

$35,000 $35,000 17 Small  Communities/Small  Projects  (COMM)

$50,000 COMM_Key

Cambria Middle  Taylor  Township

Township  Playground

KEY-­‐SC-­‐2-­‐98 $14,400 $14,400 2 Small  Communities/Small  Projects  (COMM)

$15,000 COMM_Key

Cambria Nanty  Glo  Borough Mayor  Arthur  C.  Price  Sr.  Playground

KEY-­‐SC-­‐4-­‐111

$20,000 $20,000 4 Small  Communities/Small  Projects  (COMM)

$30,000 COMM_Key

Cambria Northern  Cambria  Borough

Swimming  Pool  Feasibility  Study

BRC-­‐TAG-­‐6-­‐16

$5,000 $5,000 6 Feasibility  Studies  (COMM)

$10,000 COMM_Key

Cambria Northern  Cambria  Borough

Thomas  Barnes  Memorial  Park

BRC-­‐SC-­‐6-­‐15

$20,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Cambria Patton  Borough Borough  Park  Renovation

BRC-­‐SC-­‐12-­‐112

$40,000 $40,000 12 Small  Communities/Small  Projects  (COMM)

$67,600 COMM_Key

Cambria Portage  Borough Comp.  Rec.  Park  &  Open  Space  Plan;  Trail  Feasibility  Study

BRC-­‐TAG-­‐16-­‐70

$26,740 $15,200 16 Trail  Study  (COMM)

$90,990 COMM_Key

Cambria Richland  Township East  Hills  Comp.  Rec,  Park  &  Open  Space  Plan

BRC-­‐TAG-­‐8-­‐161

$17,600 $17,000 8 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$35,300 COMM_Key

Page 138: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  138  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Cambria Richland  Township Feasibility  Study KEY-­‐TAG-­‐5-­‐171

$7,500 $7,500 5 Feasibility  Studies  (COMM)

$15,000 COMM_Key

Cambria Richland  Township Luray  Avenue  Park BRC-­‐PRD-­‐11-­‐74

$150,000 $150,000 11 Park  Rehabilitation  and  Development  (COMM)

$309,100 COMM_Key

Cambria Southern  Alleghenies  Conservancy  

Little  Conemaugh  River  Implementation  Study

BRC-­‐RCI-­‐6-­‐17

$8,400 $9,000 6 Implementation  (RIV)

$16,800 RIVER_Key

Cambria Southmont  Borough Community  Park KEY-­‐SC-­‐2-­‐146

$20,000 $20,000 2 Small  Communities/Small  Projects  (COMM)

$34,250 COMM_Key

Cambria Summerhill  Township

Township  Park BRC-­‐SC-­‐6-­‐176

$20,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Cambria Tunnelhill  Borough Tunnelhill  Street  Park

KEY-­‐SC-­‐4-­‐152

$20,000 $20,000 4 Small  Communities/Small  Projects  (COMM)

$25,000 COMM_Key

Cambria Upper  Yoder  Township

Ridge  to  River  Trail BRC-­‐RCI-­‐8-­‐19

$9,000 $9,000 8 Implementation  (RIV)

$18,000 RIVER_Key

Cambria Vintondale  Borough Community  Park KEY-­‐SC-­‐5-­‐209

$19,921 $20,000 5 Small  Communities/Small  Projects  (COMM)

$23,921 COMM_Key

Page 139: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  139  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Cambria Western  Pennsylvania  Conservancy  

Leslie  Tract  Acquisition

BRC-­‐LTA-­‐12-­‐20

$652,500 $650,000 12 Open  Space  Acquisition  (LT)

$1,305,000 LT_Key

Cambria Westmont  Hilltop  Recreation  Authority  

Ridge  Recreation  Facility

KEY-­‐PRD-­‐3-­‐237

$48,700 $48,700 3 Park  Rehabilitation  and  Development  (COMM)

$97,400 COMM_Key

Cameron Grove  Township Sinnamahoning  Valley  Recreation  Complex  Renovation

BRC-­‐SC-­‐12-­‐99

$20,000 $20,000 12 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Cameron Rocky  Mountain  Elk  Foundation  

A.  Buehler  Property BRC-­‐LTA-­‐10-­‐17

$162,100 $150,000 10 Open  Space  Acquisition  (LT)

$324,100 LT_Key

Cameron, Clarion, Clearfield, Clinton, Elk, Forest, Jefferson, Lycoming, McKean, Potter, Tioga, Warren

McKean County PA Wilds Planning Team Implementation 2014

BRC-SR-19-173

$54,405.00 $54,000.00 19 Partnerships Projects

$83,905.00 COMM_Key

Page 140: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  140  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Cameron, Clarion, Clearfield, Clinton, Elk, Forest, Jefferson, Lycoming, McKean, Potter, Tioga, Warren

McKean County PA Wilds Planning Team Implementation 2014

BRC-SR-19-173

$54,405.00 $54,000.00 19 Partnerships Projects

$83,905.00 COMM_Key

Cameron, Clarion, Clearfield, Clinton, Elk, Forest, Jefferson, Lycoming, McKean, Potter, Tioga, Warren

McKean County PA Wilds Planning Team Implementation 2014

BRC-SR-19-173

$54,405.00 $54,000.00 19 Partnerships Projects

$83,905.00 COMM_Key

Cameron, Clarion, Clearfield, Clinton, Elk, Forest, Jefferson, Lycoming, McKean, Potter, Tioga, Warren

McKean County PA Wilds Planning Team Implementation 2014

BRC-SR-19-173

$54,405.00 $54,000.00 19 Partnerships Projects

$83,905.00 COMM_Key

Page 141: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  141  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Cameron, Clarion, Clearfield, Clinton, Elk, Forest, Jefferson, Lycoming, McKean, Potter, Tioga, Warren

McKean County PA Wilds Planning Team Implementation 2014

BRC-SR-19-173

$54,405.00 $54,000.00 19 Partnerships Projects

$83,905.00 COMM_Key

Cameron, Clarion, Clearfield, Clinton, Elk, Forest, Jefferson, Lycoming, McKean, Potter, Tioga, Warren

McKean County PA Wilds Planning Team Implementation 2014

BRC-SR-19-173

$54,405.00 $54,000.00 19 Partnerships Projects

$83,905.00 COMM_Key

Cameron, Clarion, Clearfield, Clinton, Elk, Forest, Jefferson, Lycoming, McKean, Potter, Tioga, Warren

McKean County PA Wilds Planning Team Implementation 2014

BRC-SR-19-173

$54,405.00 $54,000.00 19 Partnerships Projects

$83,905.00 COMM_Key

Page 142: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  142  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Cameron, Clarion, Clearfield, Clinton, Elk, Forest, Jefferson, Lycoming, McKean, Potter, Tioga, Warren

McKean County PA Wilds Planning Team Implementation 2014

BRC-SR-19-173

$54,405.00 $54,000.00 19 Partnerships Projects

$83,905.00 COMM_Key

Cameron, Clarion, Clearfield, Clinton, Elk, Forest, Jefferson, Lycoming, McKean, Potter, Tioga, Warren

McKean County PA Wilds Planning Team Implementation 2014

BRC-SR-19-173

$54,405.00 $54,000.00 19 Partnerships Projects

$83,905.00 COMM_Key

Cameron, Clarion, Clearfield, Clinton, Elk, Forest, Jefferson, Lycoming, McKean, Potter, Tioga, Warren

McKean County PA Wilds Planning Team Implementation 2014

BRC-SR-19-173

$54,405.00 $54,000.00 19 Partnerships Projects

$83,905.00 COMM_Key

Page 143: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  143  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Cameron, Clarion, Clearfield, Clinton, Elk, Forest, Jefferson, Lycoming, McKean, Potter, Tioga, Warren

McKean County PA Wilds Planning Team Implementation 2014

BRC-SR-19-173

$54,405.00 $54,000.00 19 Partnerships Projects

$83,905.00 COMM_Key

Cameron, Clarion, Clearfield, Clinton, Elk, Forest, Jefferson, Lycoming, McKean, Potter, Tioga, Warren

McKean County PA Wilds Planning Team Implementation 2014

BRC-SR-19-173

$54,405.00 $54,000.00 19 Partnerships Projects

$83,905.00 COMM_Key

Cameron, Clarion, Clearfield, Clinton, Elk, Forest, Jefferson, Lycoming, McKean, Potter, Tioga, Warren

McKean County PA Wilds Planning Team Implementation 2014

BRC-SR-19-173

$54,405.00 $54,000.00 19 Partnerships Projects

$83,905.00 COMM_Key

Page 144: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  144  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Cameron, Clarion, Clearfield, Clinton, Elk, Forest, Jefferson, Lycoming, McKean, Potter, Tioga, Warren

McKean County PA Wilds Planning Team Implementation 2014

BRC-SR-19-173

$54,405.00 $54,000.00 19 Partnerships Projects

$83,905.00 COMM_Key

Cameron, Clarion, Clearfield, Clinton, Elk, Forest, Jefferson, Lycoming, McKean, Potter, Tioga, Warren

McKean County PA Wilds Planning Team Implementation 2014

BRC-SR-19-173

$54,405.00 $54,000.00 19 Partnerships Projects

$83,905.00 COMM_Key

Cameron, Clarion, Clearfield, Clinton, Elk, Forest, Jefferson, Lycoming, McKean, Potter, Tioga, Warren

McKean County PA Wilds Planning Team Implementation 2014

BRC-SR-19-173

$54,405.00 $54,000.00 19 Partnerships Projects

$83,905.00 COMM_Key

Page 145: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  145  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Cameron, Clarion, Clearfield, Clinton, Elk, Forest, Jefferson, Lycoming, McKean, Potter, Tioga, Warren

McKean County PA Wilds Planning Team Implementation 2014

BRC-SR-19-173

$54,405.00 $54,000.00 19 Partnerships Projects

$83,905.00 COMM_Key

Cameron, Clarion, Clearfield, Clinton, Elk, Forest, Jefferson, Lycoming, McKean, Potter, Tioga, Warren

McKean County PA Wilds Planning Team Implementation 2014

BRC-SR-19-173

$54,405.00 $54,000.00 19 Partnerships Projects

$83,905.00 COMM_Key

Cameron,  Clearfield,  Elk,  Jefferson,  McKean,  Potter

Elk  County North  Central  Greenways  and  Open  Space  Plan

BRC-­‐TAG-­‐13.6-­‐593

$100,000 $100,000 13.6 Greenway  Plans  (COMM)

$200,000 COMM_Key

Cameron,  Clearfield,  Elk,  Jefferson,  McKean,  Potter

North  Central  Pennsylvania  Regional  Planning  and  Development  Commission  

North  Central  PA  Greenways  Implementation  Grant  Program

BRC-­‐TAG-­‐16-­‐80

$150,000 $150,000 16 Education  and  Training  (COMM)

$300,000 COMM_Key

Page 146: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  146  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Cameron,  Elk West  Creek  Recreational  Trail  Association,  Inc.  

West  Creek  Recreational  Trail  Master  Site  Development  Plan

BRC-­‐RTP-­‐13-­‐503

$19,500 $19,500 13 Feasibility  Studies  (RT)

$39,000 RT_Key

Carbon Beaver  Meadows  Borough

Third  St.  Playground    -­‐  Phase  II

KEY-­‐SC-­‐3-­‐14 $20,000 $20,000 3 Small  Communities/Small  Projects  (COMM)

$23,500 COMM_Key

Carbon Beaver  Meadows  Borough

Third  Street  Playground

KEY-­‐SC-­‐2-­‐7 $20,000 $20,000 2 Small  Communities/Small  Projects  (COMM)

$21,900 COMM_Key

Carbon Bowmanstown  Borough

Borough  Park  -­‐  Phase  II

BRC-­‐SC-­‐14-­‐76

$40,000 $40,000 14 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Carbon Bowmanstown  Borough

Bowmanstown  Recreational  Park  -­‐  Phase  I

BRC-­‐SC-­‐11-­‐108

$40,000 $40,000 11 Small  Communities/Small  Projects  (COMM)

$67,100 COMM_Key

Carbon Carbon  County Carbon  County  Greenways  and  Open  Space  Network  Plan

BRC-­‐TAG-­‐13.3-­‐462

$36,500 $36,500 13.3 Greenway  Plans  (COMM)

$73,000 COMM_Key

Carbon Carbon  County Delaware  &  Lehigh  Trail-­‐Weissport  to  East  Penn  Boat  Launch-­‐Development

BRC-­‐PRD-­‐18-­‐52

$213,020 $208,200 18 Park  Rehabilitation  and  Development  (COMM)

$427,163 COMM_Key

Page 147: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  147  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Carbon Carbon  County Mauch  Chunk  Lake  Park

BRC-­‐PRD-­‐13-­‐345

$12,800 $12,800 13 Park  Rehabilitation  and  Development  (COMM)

$25,700 COMM_Key

Carbon Carbon  County Nesquehoning  Trestle  to  Jim  Thorpe  Rail  w/  Trail  Development

BRC-­‐RTD-­‐12-­‐5

$331,200 $331,200 12 Rail  Rehabilitation  and  Development  (RT)

$662,400 RT_Key

Carbon Franklin  Township Central  Carbon  County  Recreation,  Open  Space  and  Greenway  Plan

BRC-­‐TAG-­‐15-­‐93

$71,880 $40,000 15 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$249,204 COMM_Key

Carbon Franklin  Township Phifer  Ice  Dam  Park KEY-­‐PRD-­‐5-­‐70

$31,700 $31,700 5 Park  Rehabilitation  and  Development  (COMM)

$63,400 COMM_Key

Carbon Franklin  Township Phifer  Ice  Dam  Park KEY-­‐SC-­‐1-­‐51 $20,000 $20,000 1 Small  Communities/Small  Projects  (COMM)

$34,000 COMM_Key

Carbon Jim Thorpe Borough Delaware & Lehigh Trail – Jim Thorpe Connection – Development

BRC-PRD-19-87

$586,642.00 $365,000.00 19 Park Rehabilitation and Development (COMM)

$730,802.58 COMM_Key

Page 148: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  148  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Carbon Jim Thorpe Borough Delaware & Lehigh Trail – Jim Thorpe Connection – Development

BRC-PRD-19-87

$586,642.00 $365,000.00 19 Park Rehabilitation and Development (COMM)

$730,802.58 COMM_Key

Carbon Jim Thorpe Borough Delaware & Lehigh Trail – Jim Thorpe Connection – Development

BRC-PRD-19-87

$586,642.00 $365,000.00 19 Park Rehabilitation and Development (COMM)

$730,802.58 COMM_Key

Carbon Jim  Thorpe  Borough Kemmerer  and  Memorial  Parks

KEY-­‐PRD-­‐5-­‐98

$126,000 $125,000 5 Park  Rehabilitation  and  Development  (COMM)

$252,000 COMM_Key

Carbon Jim  Thorpe  Borough Master  Site  Development  Plans

KEY-­‐TAG-­‐3-­‐99

$11,500 $11,500 3 Master  Site  Plans  (COMM)

$23,000 COMM_Key

Carbon Kidder  Township Comp.  Plan-­‐Greenways,  Open  Space  &  Non-­‐Motorized  Rec  Trails

BRC-­‐TAG-­‐13.6-­‐596

$10,000 $10,000 13.6 Greenway  Plans  (COMM)

$20,000 COMM_Key

Carbon Lansford  Borough Ashton  Hill  Community  Park

BRC-­‐SC-­‐14-­‐93

$30,000 $30,000 14 Small  Communities/Small  Projects  (COMM)

$40,000 COMM_Key

Carbon Lansford  Borough Community  Park  Rehabilitation

BRC-­‐SC-­‐12-­‐102

$20,000 $20,000 12 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Page 149: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  149  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Carbon Lansford  Borough Community  Pool  Playground

BRC-­‐SC-­‐11-­‐133

$39,500 $39,000 11 Small  Communities/Small  Projects  (COMM)

$59,000 COMM_Key

Carbon Lehigh  Canal  Recreation  Commission  

Lehigh  Canal  Park BRC-­‐PRD-­‐6-­‐95

$120,000 $120,000 6 Park  Rehabilitation  and  Development  (COMM)

$600,000 COMM_Key

Carbon Lehighton  Borough Swimming  Pool BRC-­‐PRD-­‐13-­‐115

$370,900 $350,000 13 Park  Rehabilitation  and  Development  (COMM)

$741,900 COMM_Key

Carbon Lehighton  Borough Two  Sites KEY-­‐PRD-­‐4-­‐83

$55,950 $55,000 4 Park  Rehabilitation  and  Development  (COMM)

$111,900 COMM_Key

Carbon Lower  Towamensing  Township

Knights  of  Columbus  Property

BRC-­‐ACQ-­‐7-­‐108

$89,000 $65,000 7 Acquisition  (COMM)

$169,000 COMM_Key

Carbon Lower  Towamensing  Township

Phase  One  Small  Community  Development

BRC-­‐SC-­‐8-­‐108

$40,000 $40,000 8 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Carbon Penn  Forest  Township

Recreation  Park  -­‐  Phases  1  and  2  -­‐  Development

BRC-­‐PRD-­‐15-­‐66

$392,540 $509,000 15 Park  Rehabilitation  and  Development  (COMM)

$867,159 COMM_Key

Page 150: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  150  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Carbon Summit  Hill  Borough Western  Carbon  Recreation,  Park  and  Open  Space  Plan

BRC-­‐TAG-­‐15-­‐103

$29,570 $35,725 15 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$137,960 COMM_Key

Carbon Weatherly  Borough Eurana  Park BRC-­‐SC-­‐6-­‐195

$20,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Carbon Weatherly  Borough Eurana  Park KEY-­‐SC-­‐4-­‐166

$20,000 $20,000 4 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Carbon Weatherly  Borough Eurana  Park KEY-­‐SC-­‐5-­‐218

$20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$21,500 COMM_Key

Carbon Wildlife Information Center, Inc.

Gause Land Acquisition - Addition to Lehigh Gap Nature

BRC-LTA-19-32

$13,367.00 $13,300.00 19 Open Space Acquisition (LT)

$26,734.00 LT_Key

Carbon Wildlife Information Center, Inc.

Gause Land Acquisition - Addition to Lehigh Gap Nature

BRC-LTA-19-32

$13,367.00 $13,300.00 19 Open Space Acquisition (LT)

$26,734.00 LT_Key

Carbon Wildlife Information Center, Inc.

Gause Land Acquisition - Addition to Lehigh Gap Nature

BRC-LTA-19-32

$13,367.00 $13,300.00 19 Open Space Acquisition (LT)

$26,734.00 LT_Key

Carbon,  Lehigh,  Luzerne,  Monroe,  Northampton

Wildlands  Conservancy,  Inc.  

Enhancing  the  Lehigh  River  Water  Trail

BRC-­‐RCI-­‐17-­‐166

$39,750 $39,700 17 Implementation  (RIV)

$81,750 RIVER_Key

Page 151: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  151  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Centre Bellefonte  Borough Kepler  Pool    Feasibility  Study

BRC-­‐TAG-­‐13.3-­‐458

$15,000 $15,000 13.3 Feasibility  Studies  (COMM)

$30,000 COMM_Key

Centre Bellefonte  Borough Reynolds  Avenue  Park  Acquisition

BRC-­‐RCA-­‐11-­‐3

$19,800 $21,800 11 Acquisition  (RIV)

$43,600 RIVER_Key

Centre Bellefonte  Borough Talleyrand  Park-­‐  Phase  I

BRC-­‐PRD-­‐13-­‐88

$129,800 $129,000 13 Park  Rehabilitation  and  Development  (COMM)

$259,600 COMM_Key

Centre Benner  Township Benner  Springs  Master  Site  Plan

BRC-­‐RCD-­‐12-­‐4

$98,600 $98,600 12 Development  (RIV)

$197,200 COMM_Key

Centre Benner  Township Buffalo  Run  Community  Park

KEY-­‐PRD-­‐3-­‐16

$112,000 $112,000 3 Park  Rehabilitation  and  Development  (COMM)

$239,100 COMM_Key

Centre Benner  Township Peer  to  Peer BRC-­‐TAG-­‐12-­‐270

$10,000 $10,000 12 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$11,000 COMM_Key

Centre Benner Township Spring Creek Canyon Trail – Phase 1 – Development

BRC-PRD-19-57

$114,944.37 $115,000.00 19 Park Rehabilitation and Development (COMM)

$229,888.74 COMM_Key

Centre Benner Township Spring Creek Canyon Trail – Phase 1 – Development

BRC-PRD-19-57

$114,944.37 $115,000.00 19 Park Rehabilitation and Development (COMM)

$229,888.74 COMM_Key

Page 152: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  152  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Centre Benner Township Spring Creek Canyon Trail – Phase 1 – Development

BRC-PRD-19-57

$114,944.37 $115,000.00 19 Park Rehabilitation and Development (COMM)

$229,888.74 COMM_Key

Centre Centre  County Bellefonte  Central  Rail  Trail  Feasibility  Study

BRC-­‐RTP-­‐11-­‐3

$43,500 $43,500 11 Feasibility  Studies  (RT)

$87,000 RT_Key

Centre Centre  County Nittany  &  Bald  Eagle  Valleys  Greenway

KEY-­‐TAG-­‐4-­‐26

$30,000 $30,000 4 Greenway  Plans  (COMM)

$60,000 COMM_Key

Centre Centre  Region  Council  of  Governments  

Oak  Hall  Park  Master  Site  Plan

BRC-­‐TAG-­‐12-­‐228

$38,000 $38,000 12 Master  Site  Plans  (COMM)

$76,000 COMM_Key

Centre Centre  Region  Council  of  Governments  

PSU  Whitehall  Road  Acquisition

BRC-­‐ACQ-­‐12-­‐70

$159,200 $159,000 12 Acquisition  (COMM)

$924,600 COMM_Key

Centre Centre  Region  Council  of  Governments  

Whitehall  Acquisition  -­‐  Park  Expansion

BRC-­‐ACQ-­‐16-­‐21

$217,500 $191,000 16 Acquisition  (COMM)

$435,000 COMM_Key

Centre Centre  Region  Council  of  Governments  

Whitehall  Road  Regional  Parkland  Master  Site  Plan

BRC-­‐TAG-­‐13.6-­‐589

$40,000 $40,000 13.6 Master  Site  Plans  (COMM)

$80,000 COMM_Key

Centre Centre  Regional  Recreation  Authority  

Park  Forest  Community  Swimming  Pool

BRC-­‐PRD-­‐13-­‐95

$350,000 $350,000 13 Park  Rehabilitation  and  Development  (COMM)

$3,200,000 COMM_Key

Centre Centre  Regional  Recreation  Authority  

Park  Forest  Pool BRC-­‐TAG-­‐11.5-­‐20

$22,200 $22,000 11.5 Master  Site  Plans  (COMM)

$44,500 COMM_Key

Page 153: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  153  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Centre Centre  Regional  Recreation  Authority  

Regional  Aquatics  Feasibility  Study

BRC-­‐TAG-­‐6-­‐34

$7,500 $7,500 6 Feasibility  Studies  (COMM)

$15,000 COMM_Key

Centre Centre  Regional  Recreation  Authority  

Whitehall  Road  Regional  Park  -­‐  Phase  1  -­‐  Development

BRC-­‐PRD-­‐17-­‐110

$300,000 $300,000 17 Park  Rehabilitation  and  Development  (COMM)

$5,246,000 COMM_Key

Centre Centre  Regional  Recreation  Authority  

William  L.  Welch  Swimming  Pool  Study

BRC-­‐TAG-­‐12-­‐229

$33,000 $33,000 12 Master  Site  Plans  (COMM)

$66,000 COMM_Key

Centre Centre  Regional  Recreation  Authority  

William  L.Welch  Community  Swimming  Pool

BRC-­‐PRD-­‐14-­‐124

$400,000 $375,000 14 Park  Rehabilitation  and  Development  (COMM)

$5,400,000 COMM_Key

Centre ClearWater  Conservancy  of  Central  PA,  Inc.  

Aikens  Acquisition  (Galbraith  Gap)

BRC-­‐LTA-­‐16-­‐234

$349,720 $350,000 16 Open  Space  Acquisition  (LT)

$699,440 LT_Key

Centre ClearWater  Conservancy  of  Central  PA,  Inc.  

Berkobin  Tract  Acquisition  -­‐  (Scotia  Barrens  Wildlife  Cor.)

BRC-­‐LTA-­‐13.6-­‐609

$367,000 $292,000 13.6 Open  Space  Acquisition  (LT)

$734,000 LT_Key

Centre ClearWater Conservancy of Central PA, Inc.

Hale Property Acquisition

BRC-LTA-19-18

$576,500.00 $565,500.00 19 Open Space Acquisition (LT)

$1,153,000.00 LT_Key

Centre ClearWater Conservancy of Central PA, Inc.

Hale Property Acquisition

BRC-LTA-19-18

$576,500.00 $565,500.00 19 Open Space Acquisition (LT)

$1,153,000.00 LT_Key

Page 154: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  154  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Centre ClearWater Conservancy of Central PA, Inc.

Hale Property Acquisition

BRC-LTA-19-18

$576,500.00 $565,500.00 19 Open Space Acquisition (LT)

$1,153,000.00 LT_Key

Centre ClearWater Conservancy of Central PA, Inc.

Hale Property Acquisition

BRC-LTA-19-18

$576,500.00 $565,500.00 19 Open Space Acquisition (LT)

$1,153,000.00 LT_Key

Centre ClearWater  Conservancy  of  Central  PA,  Inc.  

Millbrook  Marsh  Plan

KEY-­‐LTP-­‐2-­‐2 $13,000 $13,000 2 Critical  Habitat  Planning  (LT)

$26,000 LT_Key

Centre ClearWater  Conservancy  of  Central  PA,  Inc.  

Musser  Gap  Gateway  Acquisition

BRC-­‐LTA-­‐11-­‐9

$606,000 $806,000 11 Critical  Habitat  Acquisition  (LT)

$1,212,000 LT_Key

Centre ClearWater  Conservancy  of  Central  PA,  Inc.  

Spring  Creek  Watershed  Rivers  Cons.  Plan

KEY-­‐RCP-­‐96-­‐12

$50,000 $50,000 3 Planning  (RIV) $100,000 RIVER_Key

Centre College  Township Township  Park BRC-­‐PRD-­‐8-­‐46

$220,000 $180,000 8 Park  Rehabilitation  and  Development  (COMM)

$496,000 COMM_Key

Centre Ferguson  Township Fairbrook  Park BRC-­‐PRD-­‐7-­‐74

$117,000 $100,000 7 Park  Rehabilitation  and  Development  (COMM)

$234,255 COMM_Key

Centre Ferguson  Township Haymarket  Park  -­‐  Phase  I

KEY-­‐PRD-­‐4-­‐58

$100,000 $100,000 4 Park  Rehabilitation  and  Development  (COMM)

$200,000 COMM_Key

Page 155: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  155  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Centre Ferguson  Township Sunday  Land  Acquisition

BRC-­‐ACQ-­‐17-­‐93

$79,000 $67,200 17 Acquisition  (COMM)

$158,000 COMM_Key

Centre Ferguson  Township Tom  Tudek  Memorial  Park

BRC-­‐PRD-­‐13-­‐105

$100,000 $100,000 13 Park  Rehabilitation  and  Development  (COMM)

$347,200 COMM_Key

Centre Ferguson  Township Tudek  Memorial  Park-­‐Phase  I

KEY-­‐PRD-­‐2-­‐49

$90,000 $90,000 2 Park  Rehabilitation  and  Development  (COMM)

$180,000 COMM_Key

Centre Ferguson Township Westfield/Hillside Farm Estates Park- Phase1- Development

BRC-PRD-19-78

$200,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)

$455,830.00 COMM_Key

Centre Ferguson Township Westfield/Hillside Farm Estates Park- Phase1- Development

BRC-PRD-19-78

$200,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)

$455,830.00 COMM_Key

Centre Ferguson Township Westfield/Hillside Farm Estates Park- Phase1- Development

BRC-PRD-19-78

$200,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)

$455,830.00 COMM_Key

Centre Gregg  Township Penns  Valley  Trail  Study

BRC-­‐RTP-­‐17-­‐207

$32,370 $32,300 17 Feasibility  Studies  (RT)

$64,740 COMM_Key

Centre Harris  Township Fasick  Park  -­‐  Development

BRC-­‐SC-­‐17-­‐39

$40,000 $40,000 17 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Page 156: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  156  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Centre Harris  Township Nittany-­‐View  Park KEY-­‐SC-­‐1-­‐56 $20,000 $20,000 1 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Centre Headwaters  Charitable  Trust  

Black  Moshannon  Natural  Area

KEY-­‐LTA-­‐5-­‐3 $400,000 $300,000 5 Open  Space  Acquisition  (LT)

$843,050 LT_Key

Centre Howard  Borough Borough  Park KEY-­‐SC-­‐5-­‐89 $18,500 $18,500 5 Small  Communities/Small  Projects  (COMM)

$37,000 COMM_Key

Centre Howard  Borough Howard  Borough  Pedestrian/Bicycle  Trail  –  Development

BRC-­‐PRD-­‐17-­‐73

$46,000 $46,000 17 Park  Rehabilitation  and  Development  (COMM)

$313,950 COMM_Key

Centre Huston  Township Community  Park KEY-­‐SC-­‐2-­‐66 $20,000 $20,000 2 Small  Communities/Small  Projects  (COMM)

$24,000 COMM_Key

Centre Huston  Township Muncy  Mountain  Park  Master  Plan

BRC-­‐TAG-­‐9-­‐99

$9,000 $9,000 9 Master  Site  Plans  (COMM)

$18,000 COMM_Key

Centre Milesburg  Borough Milesburg  Community  Park

BRC-­‐SC-­‐9-­‐135

$36,900 $30,000 9 Small  Communities/Small  Projects  (COMM)

$43,800 COMM_Key

Centre Millheim  Borough Borough  Park-­‐  Phase  2  -­‐  Development

BRC-­‐PRD-­‐16-­‐147

$57,500 $57,500 16 Park  Rehabilitation  and  Development  (COMM)

$115,124 COMM_Key

Page 157: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  157  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Centre Millheim  Borough Millheim  Borough  Recreation  Park  Plan

BRC-­‐TAG-­‐12-­‐252

$11,600 $11,600 12 Master  Site  Plans  (COMM)

$23,100 COMM_Key

Centre Patton  Township Haugh  Park KEY-­‐PRD-­‐3-­‐162

$200,000 $100,000 3 Park  Rehabilitation  and  Development  (COMM)

$400,000 COMM_Key

Centre Philipsburg Borough 13th Street/Slabtown Playground- Development

BRC-SC-19-46

$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)

$60,000.00 COMM_Key

Centre Philipsburg Borough 13th Street/Slabtown Playground- Development

BRC-SC-19-46

$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)

$60,000.00 COMM_Key

Centre Philipsburg Borough 13th Street/Slabtown Playground- Development

BRC-SC-19-46

$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)

$60,000.00 COMM_Key

Centre Philipsburg  Borough Cold  Stream  Dam  Recreation  Area  Renovation

BRC-­‐PRD-­‐12-­‐187

$60,000 $60,000 12 Park  Rehabilitation  and  Development  (COMM)

$120,000 COMM_Key

Centre Philipsburg  Borough Powerhouse  Park KEY-­‐SC-­‐2-­‐122

$20,000 $20,000 2 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Centre Port  Matilda  Borough

Borough  Park KEY-­‐SC-­‐5-­‐167

$20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$31,996 COMM_Key

Page 158: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  158  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Centre Potter  Township Peer  to  Peer BRC-­‐TAG-­‐12-­‐272

$10,000 $10,000 12 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$11,000 COMM_Key

Centre Potter  Township PSU  Land  Acquisition BRC-­‐ACQ-­‐11.5-­‐13

$375,000 $250,000 11.5 Acquisition  (COMM)

$750,000 COMM_Key

Centre Snow  Shoe  Township

Township  Park KEY-­‐SC-­‐5-­‐185

$17,880 $18,000 5 Small  Communities/Small  Projects  (COMM)

$19,080 COMM_Key

Centre Snow  Shoe  Township

Township  Park  Renovation

BRC-­‐SC-­‐12-­‐124

$48,000 $24,700 12 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Centre Spring  Creek  Chapter  of  Trout  Unlimited  

Sinking  Creek KEY-­‐CHP-­‐2-­‐5

$5,000 $5,000 5 Coldwater  Heritage  Partnership

$5,000 RIVER_Key

Centre Spring  Creek  Chapter  of  Trout  Unlimited  

Spring  Creek  Access  &  Habitat  Restoration

BRC-­‐RCD-­‐13.3-­‐511

$179,200 $179,200 13.3 Development  (RIV)

$539,700 RIVER_Key

Centre Spring  Township Pleasant  Gap  Elementary  School  Park  Site

BRC-­‐PRD-­‐8-­‐185

$53,700 $50,000 8 Park  Rehabilitation  and  Development  (COMM)

$107,400 COMM_Key

Centre State  College  Borough

Community  Flower  Garden

KEY-­‐PRD-­‐5-­‐191

$10,000 $10,000 5 Park  Rehabilitation  and  Development  (COMM)

$20,000 COMM_Key

Page 159: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  159  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Centre State College Borough High Point Park- Development

BRC-PRD-19-119

$25,000.00 $25,000.00 19 Park Rehabilitation and Development (COMM)

$56,248.00 COMM_Key

Centre State College Borough High Point Park- Development

BRC-PRD-19-119

$25,000.00 $25,000.00 19 Park Rehabilitation and Development (COMM)

$56,248.00 COMM_Key

Centre State College Borough High Point Park- Development

BRC-PRD-19-119

$25,000.00 $25,000.00 19 Park Rehabilitation and Development (COMM)

$56,248.00 COMM_Key

Centre State  College  Borough

Holmes-­‐Foster  Park  Master  Site  Plan

BRC-­‐TAG-­‐18-­‐150

$10,000 $10,000 18 Master  Site  Plans  (COMM)

$25,000 COMM_Key

Centre State  College  Borough

Master  Site  Development  Plan

KEY-­‐TAG-­‐2-­‐150

$6,000 $6,000 2 Master  Site  Plans  (COMM)

$12,000 COMM_Key

Centre State  College  Borough

Orchard  Park BRC-­‐PRD-­‐6-­‐174

$82,500 $82,500 6 Park  Rehabilitation  and  Development  (COMM)

$165,000 COMM_Key

Centre State  College  Borough

Orchard  Park    -­‐  Phase  I

KEY-­‐PRD-­‐4-­‐148

$146,100 $100,000 4 Park  Rehabilitation  and  Development  (COMM)

$292,300 COMM_Key

Centre State  College  Borough

Orchard  Park  Expansion

KEY-­‐ACQ-­‐1-­‐132

$237,500 $100,000 1 Acquisition  (COMM)

$475,000 COMM_Key

Page 160: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  160  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Centre State  College  Borough

Orchard  Park-­‐  Development

BRC-­‐PRD-­‐18-­‐102

$50,000 $50,000 18 Park  Rehabilitation  and  Development  (COMM)

$106,212 COMM_Key

Centre State  College  Borough

Sunset  Park  Tot  Lot  and  Trail

BRC-­‐PRD-­‐13-­‐146

$15,000 $15,000 13 Park  Rehabilitation  and  Development  (COMM)

$31,200 COMM_Key

Centre State  College  Borough

Westerly  Parkway  -­‐  Wetland  Education  Site

BRC-­‐PRD-­‐14-­‐173

$36,700 $36,700 14 Park  Rehabilitation  and  Development  (COMM)

$73,400 COMM_Key

Centre The  Conservation  Fund  

Curtin  Estate  Lands BRC-­‐LTA-­‐7-­‐1

$800,000 $770,000 7 Open  Space  Acquisition  (LT)

$1,600,000 LT_Key

Centre Unionville  Borough Borough  Park BRC-­‐SC-­‐8-­‐196

$40,000 $40,000 8 Small  Communities/Small  Projects  (COMM)

$60,600 COMM_Key

Centre Unionville  Borough Unionville  Borough  Park

BRC-­‐SC-­‐10-­‐102

$40,000 $40,000 10 Small  Communities/Small  Projects  (COMM)

$61,720 COMM_Key

Centre Walker  Township Walker  Park BRC-­‐SC-­‐6-­‐185

$20,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$33,000 COMM_Key

Page 161: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  161  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Centre Walker  Township Walker  Township  Mini  Comp  Plan/Master  Plan

KEY-­‐TAG-­‐4-­‐162

$10,000 $10,000 4 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$20,000 COMM_Key

Centre,  Clinton

The  Conservation  Fund  

Litke  Estate  Acquisition

BRC-­‐LTA-­‐8-­‐17

$2,000,000 $1,000,000 8 Critical  Habitat  Acquisition  (LT)

$4,000,000 LT_Key

Centre,  Lycoming

SEDA-­‐Council  of  Governments  

TreeVitalize  Metros BRC-­‐TV-­‐15-­‐32

$57,000 $57,000 15 Park  Rehabilitation  and  Development  (COMM)

$114,000 COMM_Key

Chester Atglen  Borough Community  Park  Master  Plan

BRC-­‐TAG-­‐6-­‐13

$10,000 $10,000 6 Master  Site  Plans  (COMM)

$20,000 COMM_Key

Chester Brandywine  Conservancy  

Big  Elk  Creek  Woods KEY-­‐LTA-­‐4-­‐2 $348,000 $200,000 4 Critical  Habitat  Acquisition  (LT)

$696,200 LT_Key

Chester Brandywine  Conservancy  

Krause  Conservation  Easement

BRC-­‐LTA-­‐6-­‐4

$105,000 $100,000 6 Open  Space  Acquisition  (LT)

$210,000 LT_Key

Chester Brandywine  Valley  Association  

Pocopson  Program KEY-­‐LTA-­‐3-­‐2 $75,000 $55,000 3 Critical  Habitat  Acquisition  (LT)

$150,000 LT_Key

Chester Caln  Township King  Highway  Master  Plan

BRC-­‐TAG-­‐12.5-­‐26

$17,500 $17,000 12.5 Master  Site  Plans  (COMM)

$35,000 COMM_Key

Chester Caln  Township Lloyd  Park  Master  Plan

BRC-­‐TAG-­‐9-­‐40

$15,000 $15,000 9 Master  Site  Plans  (COMM)

$30,000 COMM_Key

Page 162: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  162  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Chester Caln  Township Lloyd  Park  Phase  1  Development

BRC-­‐PRD-­‐12-­‐132

$200,000 $200,000 12 Park  Rehabilitation  and  Development  (COMM)

$594,700 COMM_Key

Chester Caln  Township Municipal  and  Lloyd  Parks

KEY-­‐PRD-­‐5-­‐27

$100,000 $100,000 5 Park  Rehabilitation  and  Development  (COMM)

$400,000 COMM_Key

Chester Charlestown  Township

Coleman  Conservation  Easement  (Pigeon  Run)

BRC-­‐ACQ-­‐13-­‐234

$426,400 $109,000 13 Acquisition  (COMM)

$852,700 COMM_Key

Chester Charlestown  Township

McDevitt  Conservation  Easement

BRC-­‐ACQ-­‐13-­‐232

$1,447,500 $350,000 13 Acquisition  (COMM)

$2,895,000 COMM_Key

Chester Charlestown  Township

Stevens  Property  Conservation  Easement

BRC-­‐ACQ-­‐13-­‐233

$79,700 $79,000 13 Acquisition  (COMM)

$159,400 COMM_Key

Chester Chester  County Brandywine  Battlefield  Park  -­‐  Phase  2

BRC-­‐ACQ-­‐8-­‐39

$500,000 $500,000 8 Acquisition  (COMM)

$4,000,000 COMM_Key

Chester Chester  County Chester  County  Schuylkill  River  Trail  Construction

BRC-­‐RTD-­‐15-­‐108

$969,577 $406,035 15 Rail  Rehabilitation  and  Development  (RT)

$2,003,154 RT_Key

Chester Chester  County Chester  Countywide  Watershed  Plan

KEY-­‐RCP-­‐5-­‐5

$230,000 $100,000 5 Planning  (RIV) $380,000 RIVER_Key

Page 163: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  163  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Chester Chester  County Chester  Valley  Trail  -­‐  Phase  III  Construction

BRC-­‐PRD-­‐17-­‐221

$500,000 $500,000 17 Park  Rehabilitation  and  Development  (COMM)

$1,250,000 COMM_Key

Chester Chester County Exton Park - Phase 1A -Development

BRC-PRD-19-67

$240,000.00 $240,000.00 19 Park Rehabilitation and Development (COMM)

$500,000.00 COMM_Key

Chester Chester County Exton Park - Phase 1A -Development

BRC-PRD-19-67

$240,000.00 $240,000.00 19 Park Rehabilitation and Development (COMM)

$500,000.00 COMM_Key

Chester Chester County Exton Park - Phase 1A -Development

BRC-PRD-19-67

$240,000.00 $240,000.00 19 Park Rehabilitation and Development (COMM)

$500,000.00 COMM_Key

Chester Chester  County Exton  Park  -­‐  Phase  I BRC-­‐PRD-­‐14-­‐125

$300,000 $250,000 14 Park  Rehabilitation  and  Development  (COMM)

$880,000 COMM_Key

Chester Chester  County Interpretive  Trail BRC-­‐PRD-­‐6-­‐38

$100,000 $100,000 6 Park  Rehabilitation  and  Development  (COMM)

$290,000 COMM_Key

Chester Chester  County Master  Plan  for  Several  Parks

KEY-­‐TAG-­‐4-­‐28

$49,000 $40,000 4 Master  Site  Plans  (COMM)

$100,000 COMM_Key

Page 164: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  164  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Chester Chester County Northern Struble Trail Study - Planning

BRC-TAG-19-129

$35,000.00 $35,000.00 19 Trail Study (COMM)

$70,030.00 COMM_Key

Chester Chester County Northern Struble Trail Study - Planning

BRC-TAG-19-129

$35,000.00 $35,000.00 19 Trail Study (COMM)

$70,030.00 COMM_Key

Chester Chester County Northern Struble Trail Study - Planning

BRC-TAG-19-129

$35,000.00 $35,000.00 19 Trail Study (COMM)

$70,030.00 COMM_Key

Chester Chester County Northern Struble Trail Study - Planning

BRC-TAG-19-129

$35,000.00 $35,000.00 19 Trail Study (COMM)

$70,030.00 COMM_Key

Chester Chester County Northern Struble Trail Study - Planning

BRC-TAG-19-129

$35,000.00 $35,000.00 19 Trail Study (COMM)

$70,030.00 COMM_Key

Chester Chester County Northern Struble Trail Study - Planning

BRC-TAG-19-129

$35,000.00 $35,000.00 19 Trail Study (COMM)

$70,030.00 COMM_Key

Chester Chester  County Struble  Trail KEY-­‐RTD-­‐95-­‐8

$25,400 $25,400 1 Rail  Rehabilitation  and  Development  (RT)

$61,700 RT_Key

Chester Coatesville  City Activity  Center BRC-­‐TAG-­‐8-­‐45

$500,000 $20,000 8 Feasibility  Studies  (COMM)

$2,500,000 COMM_Key

Chester Coatesville  City Brandywine  Creek  Trail

BRC-­‐PRD-­‐13-­‐97

$250,000 $250,000 13 Park  Rehabilitation  and  Development  (COMM)

$1,500,000 COMM_Key

Chester Coatesville  City Inter-­‐Municipal  Neighborhood  Park

BRC-­‐PRD-­‐6-­‐42

$182,000 $182,000 6 Park  Rehabilitation  and  Development  (COMM)

$512,000 COMM_Key

Chester Coatesville  City James  Memorial  Park

BRC-­‐ACQ-­‐7-­‐39

$39,325 $39,000 7 Acquisition  (COMM)

$79,325 COMM_Key

Page 165: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  165  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Chester Coatesville  City Lumber  Street  Park KEY-­‐PRD-­‐5-­‐36

$70,000 $70,000 5 Park  Rehabilitation  and  Development  (COMM)

$140,000 COMM_Key

Chester Downingtown  Borough

Brandywine  Trail KEY-­‐PRD-­‐3-­‐50

$112,100 $100,000 3 Park  Rehabilitation  and  Development  (COMM)

$224,300 COMM_Key

Chester Downingtown  Borough

Park  System  Master  Site  Plans

KEY-­‐TAG-­‐4-­‐42

$23,300 $23,300 4 Master  Site  Plans  (COMM)

$46,600 COMM_Key

Chester Downingtown  Borough

Sky's  the  Limit  All-­‐Abilities  Playground  Project

BRC-­‐PRD-­‐10-­‐115

$100,000 $75,000 10 Park  Rehabilitation  and  Development  (COMM)

$374,400 COMM_Key

Chester East  Bradford  Township

East  Branch  Brandywine  Trail  -­‐  Phase  3  -­‐  Development

BRC-­‐PRD-­‐18-­‐65

$80,000 $80,000 18 Park  Rehabilitation  and  Development  (COMM)

$162,385 COMM_Key

Chester East  Bradford  Township

Schramm  Acquisition BRC-­‐ACQ-­‐14-­‐53

$1,521,850 $300,000 14 Acquisition  (COMM)

$3,043,700 COMM_Key

Chester East  Bradford  Township

Skelp  Level  Park KEY-­‐ACQ-­‐4-­‐43

$410,000 $100,000 4 Acquisition  (COMM)

$910,000 COMM_Key

Chester East  Brandywine  Township

Bondsville  Mill  Park  Master  Site  Plan

BRC-­‐TAG-­‐14-­‐199

$30,700 $30,700 14 Master  Site  Plans  (COMM)

$61,300 COMM_Key

Page 166: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  166  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Chester East  Brandywine  Township

Community  Park  -­‐  Phase  II

KEY-­‐PRD-­‐4-­‐44

$150,000 $75,000 4 Park  Rehabilitation  and  Development  (COMM)

$450,000 COMM_Key

Chester East  Brandywine  Township

Community  Park  Phase  III

BRC-­‐ACQ-­‐7-­‐54

$127,619 $127,000 7 Acquisition  (COMM)

$585,869 COMM_Key

Chester East  Caln  Township Township  Park  Master  Plan

KEY-­‐TAG-­‐4-­‐45

$15,000 $15,000 4 Master  Site  Plans  (COMM)

$30,000 COMM_Key

Chester East  Coventry  Township

Ellis  Woods  Park BRC-­‐TAG-­‐7-­‐55

$20,000 $20,000 7 Master  Site  Plans  (COMM)

$40,000 COMM_Key

Chester East  Fallowfield  Township

Community  Park  Development  -­‐  Phase  1

BRC-­‐PRD-­‐12-­‐148

$250,000 $250,000 12 Park  Rehabilitation  and  Development  (COMM)

$550,000 COMM_Key

Chester East  Fallowfield  Township

East  Fallowfield  Community  Park

BRC-­‐TAG-­‐7-­‐57

$27,000 $27,000 7 Master  Site  Plans  (COMM)

$54,000 COMM_Key

Chester East  Fallowfield  Township

East  Fallowfield  Township  Community  Park  -­‐Development

BRC-­‐PRD-­‐18-­‐66

$137,650 $137,600 18 Park  Rehabilitation  and  Development  (COMM)

$275,300 COMM_Key

Chester East  Fallowfield  Township

Township  Park KEY-­‐ACQ-­‐2-­‐40

$254,900 $155,000 2 Acquisition  (COMM)

$561,000 COMM_Key

Chester East  Marlborough  Township

Unionville  Community  Park  -­‐  Phase  1-­‐  Development

BRC-­‐PRD-­‐17-­‐116

$455,000 $430,000 17 Park  Rehabilitation  and  Development  (COMM)

$1,005,000 COMM_Key

Page 167: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  167  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Chester East Marlborough Township

Unionville Community Park - Phase 2 -Development

BRC-PRD-19-76

$534,794.00 $250,000.00 19 Park Rehabilitation and Development (COMM)

$1,069,588.00 COMM_Key

Chester East Marlborough Township

Unionville Community Park - Phase 2 -Development

BRC-PRD-19-76

$534,794.00 $250,000.00 19 Park Rehabilitation and Development (COMM)

$1,069,588.00 COMM_Key

Chester East Marlborough Township

Unionville Community Park - Phase 2 -Development

BRC-PRD-19-76

$534,794.00 $250,000.00 19 Park Rehabilitation and Development (COMM)

$1,069,588.00 COMM_Key

Chester East  Marlborough  Township

Unionville  Community  Park  Master  Site  Plan

BRC-­‐TAG-­‐15-­‐91

$27,500 $20,000 15 Master  Site  Plans  (COMM)

$55,000 COMM_Key

Chester East  Pikeland  Township

French  Creek  Trail  -­‐  Phase  1  -­‐  Development

BRC-­‐PRD-­‐17-­‐117

$213,600 $213,600 17 Park  Rehabilitation  and  Development  (COMM)

$545,000 COMM_Key

Chester East  Pikeland  Township

Kimberton  Community  Park

KEY-­‐PRD-­‐3-­‐55

$125,000 $100,000 3 Park  Rehabilitation  and  Development  (COMM)

$325,000 COMM_Key

Chester East  Pikeland  Township

Master  Site  Development  Plan

KEY-­‐TAG-­‐1-­‐43

$10,000 $10,000 1 Master  Site  Plans  (COMM)

$20,000 COMM_Key

Chester East  Vincent  Township

Community  Park KEY-­‐ACQ-­‐1-­‐44

$99,000 $78,000 1 Acquisition  (COMM)

$198,000 COMM_Key

Page 168: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  168  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Chester East  Vincent  Township

Francis  Parcel  Acquisition

BRC-­‐ACQ-­‐9-­‐70

$69,400 $10,900 9 Acquisition  (COMM)

$138,900 COMM_Key

Chester East  Vincent  Township

Reiff  Tract  Acquisition

BRC-­‐ACQ-­‐13-­‐235

$912,500 $800,000 13 Acquisition  (COMM)

$1,827,500 COMM_Key

Chester East  Vincent  Township

Veterans’  Center  Park  Master  Site  Plan

BRC-­‐TAG-­‐18-­‐145

$30,837 $30,000 18 Master  Site  Plans  (COMM)

$61,674 COMM_Key

Chester East  Whiteland  Township

Route  401  Site-­‐Phase  II

KEY-­‐PRD-­‐2-­‐42

$45,000 $35,000 2 Park  Rehabilitation  and  Development  (COMM)

$180,000 COMM_Key

Chester Easttown  Township O'Dell  Tract  -­‐  Township  Park

KEY-­‐PRD-­‐3-­‐57

$330,000 $100,000 3 Park  Rehabilitation  and  Development  (COMM)

$660,000 COMM_Key

Chester Elverson  Borough Livingood  Park KEY-­‐PRD-­‐3-­‐60

$50,000 $50,000 3 Park  Rehabilitation  and  Development  (COMM)

$136,000 COMM_Key

Chester Franklin  Township Annand  Acquisition  (White  Clay  Greenway)

BRC-­‐ACQ-­‐14-­‐56

$558,000 $500,000 14 Acquisition  (COMM)

$1,116,000 COMM_Key

Chester Franklin  Township Community  Park-­‐Phase  I

KEY-­‐PRD-­‐2-­‐51

$250,000 $210,000 2 Park  Rehabilitation  and  Development  (COMM)

$571,000 COMM_Key

Page 169: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  169  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Chester Franklin  Township Goodwin  Parcel  South  Acquisition-­‐  White  Clay  Greenway

BRC-­‐ACQ-­‐13.3-­‐276

$112,000 $112,000 13.3 Acquisition  (COMM)

$224,000 COMM_Key

Chester Franklin  Township Miller  Property  Acquisition

LWCF  42-­‐01560

$1,288,750 $96,077 14 Acquisition  (COMM)

$2,577,500 COMM_Key

Chester Franklin  Township Trail  Feasibility  Study BRC-­‐TAG-­‐12-­‐237

$19,000 $19,000 12 Feasibility  Studies  (COMM)

$38,000 COMM_Key

Chester French  &  Pickering  Creeks  Conservation  Trust,  Inc.  

Desfor  Easement  (Pigeon  Run  Greenway)

BRC-­‐LTA-­‐13-­‐514

$667,000 $500,000 13 Open  Space  Acquisition  (LT)

$1,317,000 LT_Key

Chester French  &  Pickering  Creeks  Conservation  Trust,  Inc.  

French  Creek  Road  Project

BRC-­‐LTA-­‐7-­‐27

$81,000 $96,000 7 Open  Space  Acquisition  (LT)

$192,000 LT_Key

Chester French  &  Pickering  Creeks  Conservation  Trust,  Inc.  

French  Creek  Trail BRC-­‐RCI-­‐8-­‐4 $12,500 $12,000 8 Implementation  (RIV)

$25,000 RIVER_Key

Chester French  &  Pickering  Creeks  Conservation  Trust,  Inc.  

French  Creek  Trail  Easement

BRC-­‐LTA-­‐11-­‐10

$77,500 $75,000 11 Open  Space  Acquisition  (LT)

$155,000 LT_Key

Chester French  &  Pickering  Creeks  Conservation  Trust,  Inc.  

Marinucci  Property BRC-­‐LTA-­‐6-­‐10

$150,000 $120,000 6 Open  Space  Acquisition  (LT)

$600,000 LT_Key

Page 170: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  170  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Chester French  &  Pickering  Creeks  Conservation  Trust,  Inc.  

Miller  Marsh  Project BRC-­‐LTA-­‐9-­‐5

$52,200 $52,000 9 Open  Space  Acquisition  (LT)

$105,000 LT_Key

Chester French  &  Pickering  Creeks  Conservation  Trust,  Inc.  

Thorncroft  Conservation  Easement

BRC-­‐LTA-­‐17-­‐53

$329,000 $329,000 17 Open  Space  Acquisition  (LT)

$1,977,000 LT_Key

Chester French  &  Pickering  Creeks  Conservation  Trust,  Inc.  

Weney  Conservation  Easement

BRC-­‐LTA-­‐13-­‐515

$83,500 $60,400 13 Open  Space  Acquisition  (LT)

$167,000 LT_Key

Chester Green  Valleys  Association  of  Southeastern  PA  

French  &  Pickering  Creek  Watershed  Plan

KEY-­‐RCP-­‐95-­‐08

$50,000 $50,000 1 Planning  (RIV) $150,000 RIVER_Key

Chester Green  Valleys  Association  of  Southeastern  PA  

French  Creek  Streambank  Reclamation

BRC-­‐RCD-­‐6-­‐12

$44,500 $104,500 6 Development  (RIV)

$209,000 RIVER_Key

Chester Green  Valleys  Association  of  Southeastern  PA  

Sustainable  Municipal  Watershed  Management

BRC-­‐RCI-­‐9-­‐8 $115,000 $29,000 9 Implementation  (RIV)

$292,000 RIVER_Key

Chester Green  Valleys  Association  of  Southeastern  PA  

Watershed  Mgmt.  in  Pigeon  Creek  &  Stony

KEY-­‐RCP-­‐96-­‐05

$42,300 $42,300 3 Planning  (RIV) $84,600 RIVER_Key

Chester Kennett  Area  Park  Authority  

Park  Addition KEY-­‐ACQ-­‐5-­‐103

$45,000 $45,000 5 Acquisition  (COMM)

$145,000 COMM_Key

Page 171: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  171  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Chester Kennett  Square  Borough

Red  Clay  Greenway  Trail

BRC-­‐PRD-­‐9-­‐108

$100,000 $50,000 9 Park  Rehabilitation  and  Development  (COMM)

$540,100 COMM_Key

Chester Kennett  Township Kennett  Pike  Bikeway  Study

BRC-­‐TAG-­‐12-­‐240

$42,200 $42,000 12 Trail  Study  (COMM)

$97,400 COMM_Key

Chester Kennett  Township  Land  Trust  

Halsted/Melody  Nature  Preserve  Acquisition

BRC-­‐LTA-­‐13.3-­‐517

$750,000 $750,000 13.3 Open  Space  Acquisition  (LT)

$4,024,400 LT_Key

Chester Kennett  Township  Land  Trust  

State  Line  Woods BRC-­‐LTA-­‐6-­‐8

$222,000 $180,000 6 Critical  Habitat  Acquisition  (LT)

$444,000 LT_Key

Chester Kennett  Township  Land  Trust  

Whittle  Conservation  Easement

BRC-­‐LTA-­‐13-­‐21

$550,000 $450,000 13 Open  Space  Acquisition  (LT)

$1,770,300 LT_Key

Chester London  Britain  Township

Mason-­‐Dixon  Greenway  Master  Site  Plan  -­‐  South

BRC-­‐TAG-­‐8-­‐106

$25,000 $25,000 8 Greenway  Plans  (COMM)

$52,800 COMM_Key

Chester London  Britain  Township

Mason-­‐Dixon  Greenway  South  Trail

BRC-­‐PRD-­‐13-­‐118

$250,000 $250,000 13 Park  Rehabilitation  and  Development  (COMM)

$506,300 COMM_Key

Chester London  Britain  Township

Nichol  Park KEY-­‐PRD-­‐3-­‐116

$150,000 $100,000 3 Park  Rehabilitation  and  Development  (COMM)

$335,300 COMM_Key

Page 172: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  172  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Chester London  Britain  Township

Nichol  Park  Addition  (Dehorty  Acquisition)

BRC-­‐ACQ-­‐11.5-­‐9

$199,000 $199,000 11.5 Acquisition  (COMM)

$398,000 COMM_Key

Chester London  Britain  Township

Nichol  Park  Development  -­‐  Phase  II

BRC-­‐PRD-­‐13.3-­‐547

$153,000 $150,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$306,500 COMM_Key

Chester London  Britain  Township

Nichol  Park  Expansion  Project

BRC-­‐TAG-­‐13-­‐190

$12,500 $12,500 13 Master  Site  Plans  (COMM)

$25,000 COMM_Key

Chester London  Britain  Township

Schaer  Easement BRC-­‐ACQ-­‐13.3-­‐548

$258,063 $105,000 13.3 Acquisition  (COMM)

$516,127 COMM_Key

Chester London  Grove  Township

Community  Park BRC-­‐PRD-­‐13.3-­‐386

$250,000 $250,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$3,608,400 COMM_Key

Chester London  Grove  Township

Community  Park  Master  Site  Plan

BRC-­‐TAG-­‐11-­‐218

$35,000 $35,000 11 Master  Site  Plans  (COMM)

$70,000 COMM_Key

Chester London  Grove  Township

East  Branch  White  Clay  Creek  Watershed

KEY-­‐CHP-­‐2-­‐1

$5,000 $5,000 5 Coldwater  Heritage  Partnership

$5,000 RIVER_Key

Chester London  Grove  Township

Goddard  Park  -­‐  Phase  2  -­‐  Development

BRC-­‐PRD-­‐17-­‐132

$250,000 $250,000 17 Park  Rehabilitation  and  Development  (COMM)

$572,494 COMM_Key

Page 173: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  173  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Chester London  Grove  Township

Goodwin  Parcel  North  Acquisition  -­‐  (White  Clay  Greenway)

BRC-­‐ACQ-­‐13.3-­‐280

$205,000 $150,000 13.3 Acquisition  (COMM)

$410,000 COMM_Key

Chester Londonderry  Township

Community  Park KEY-­‐ACQ-­‐3-­‐117

$45,000 $22,500 3 Acquisition  (COMM)

$90,000 COMM_Key

Chester Natural  Lands  Trust,  Inc.  

Armstrong  East  Property  Acquisition

BRC-­‐LTA-­‐11.5-­‐4

$420,000 $420,000 11.5 Open  Space  Acquisition  (LT)

$840,000 LT_Key

Chester Natural  Lands  Trust,  Inc.  

Birch  Run  Forest  Preserve  Project

BRC-­‐RCA-­‐9-­‐12

$230,000 $200,000 9 Acquisition  (RIV)

$432,000 RIVER_Key

Chester Natural  Lands  Trust,  Inc.  

Campus  Conservation  and  Management  Plan

BRC-­‐LTP-­‐15-­‐127

$35,320 $30,000 15 Open  Space  Planning  (LT)

$70,640 LT_Key

Chester Natural  Lands  Trust,  Inc.  

Crow's  Nest  Farm  Preserve

KEY-­‐LTA-­‐1-­‐7 $300,000 $200,000 1 Critical  Habitat  Acquisition  (LT)

$800,000 LT_Key

Chester Natural  Lands  Trust,  Inc.  

Crow's  Nest  Preserve KEY-­‐LTA-­‐3-­‐8 $147,250 $100,000 3 Open  Space  Acquisition  (LT)

$250,000 LT_Key

Chester Natural  Lands  Trust,  Inc.  

Deborah's  Rock  Farm  Preserve

KEY-­‐LTA-­‐1-­‐8 $700,000 $275,000 1 Critical  Habitat  Acquisition  (LT)

$875,000 LT_Key

Chester Natural  Lands  Trust,  Inc.  

Furlong  Acquisition BRC-­‐LTA-­‐13.3-­‐526

$121,000 $121,000 13.3 Open  Space  Acquisition  (LT)

$254,900 LT_Key

Chester Natural  Lands  Trust,  Inc.  

Goat  Hill  Barrens KEY-­‐LTA-­‐3-­‐9 $139,250 $75,000 3 Critical  Habitat  Acquisition  (LT)

$150,000 LT_Key

Page 174: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  174  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Chester Natural  Lands  Trust,  Inc.  

Goodwin  Easement  (Center  Parcel)  White  Clay  Creek

BRC-­‐LTA-­‐13.3-­‐527

$173,500 $173,000 13.3 Open  Space  Acquisition  (LT)

$347,000 LT_Key

Chester Natural  Lands  Trust,  Inc.  

Henderson  Acquisition

BRC-­‐LTA-­‐18-­‐14

$164,200 $154,000 18 Open  Space  Acquisition  (LT)

$328,400 LT_Key

Chester Natural  Lands  Trust,  Inc.  

Kalb  Easement BRC-­‐LTA-­‐13.3-­‐528

$845,545 $284,395 13.3 Open  Space  Acquisition  (LT)

$1,691,089 LT_Key

Chester Natural  Lands  Trust,  Inc.  

Karillian  Property  Acquisition

BRC-­‐LTA-­‐11-­‐21

$137,500 $137,500 11 Open  Space  Acquisition  (LT)

$275,000 LT_Key

Chester Natural  Lands  Trust,  Inc.  

Phelps/White  Clay  Creek  Acquisition

BRC-­‐LTA-­‐8-­‐10

$298,100 $298,000 8 Open  Space  Acquisition  (LT)

$596,400 LT_Key

Chester Natural  Lands  Trust,  Inc.  

Sadsbury  Woodlands KEY-­‐LTA-­‐1-­‐9 $222,575 $175,000 1 Critical  Habitat  Acquisition  (LT)

$400,000 LT_Key

Chester Natural  Lands  Trust,  Inc.  

Sadsbury  Woodlands KEY-­‐LTA-­‐3-­‐11

$126,500 $95,000 3 Critical  Habitat  Acquisition  (LT)

$200,000 LT_Key

Chester Natural  Lands  Trust,  Inc.  

Sadsbury  Woodlands KEY-­‐LTA-­‐4-­‐12

$398,000 $375,000 4 Open  Space  Acquisition  (LT)

$821,900 LT_Key

Chester Natural  Lands  Trust,  Inc.  

Schulz  Property  Acquisition

BRC-­‐LTA-­‐16-­‐33

$75,000 $75,000 16 Open  Space  Acquisition  (LT)

$287,515 LT_Key

Chester Natural  Lands  Trust,  Inc.  

Skiles  Property  Acquisition  (Sadsbury  Woods)

BRC-­‐LTA-­‐11-­‐18

$37,500 $37,500 11 Open  Space  Acquisition  (LT)

$75,000 LT_Key

Page 175: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  175  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Chester Natural  Lands  Trust,  Inc.  

Sugartown  Barrens  &  Woodlands  Acquisition

BRC-­‐LTA-­‐8-­‐11

$1,260,300 $750,000 8 Critical  Habitat  Acquisition  (LT)

$5,902,500 LT_Key

Chester Natural  Lands  Trust,  Inc.  

Tavangar  Land  Acquisition

BRC-­‐LTA-­‐13.3-­‐530

$536,000 $250,000 13.3 Open  Space  Acquisition  (LT)

$1,072,300 LT_Key

Chester Natural  Lands  Trust,  Inc.  

Unionville  Barrens  Acquisition

BRC-­‐LTA-­‐12.5-­‐10

$2,600,000 $1,500,000 12.5 Open  Space  Acquisition  (LT)

$5,200,000 LT_Key

Chester New  Garden  Township

Greenways  Plan BRC-­‐TAG-­‐13-­‐199

$17,500 $17,500 13 Greenway  Plans  (COMM)

$35,000 COMM_Key

Chester New  Garden  Township

New  Garden  Park-­‐  Phase  I

BRC-­‐PRD-­‐14-­‐157

$250,000 $188,000 14 Park  Rehabilitation  and  Development  (COMM)

$1,000,000 COMM_Key

Chester New  London  Township

Stanwell  Land  Acquisition

BRC-­‐ACQ-­‐17-­‐97

$245,000 $163,500 17 Acquisition  (COMM)

$490,000 COMM_Key

Chester Newlin  Township Claffy  Land  Acquisition

BRC-­‐ACQ-­‐17-­‐98

$43,300 $43,300 17 Acquisition  (COMM)

$270,800 COMM_Key

Chester North  Coventry  Township

Baker  Property  Acquisition

BRC-­‐ACQ-­‐12.5-­‐17

$365,000 $350,000 12.5 Acquisition  (COMM)

$730,000 COMM_Key

Chester North  Coventry  Township

Bentley  Acquisition  (Coventry  Woods)

BRC-­‐ACQ-­‐14-­‐65

$875,000 $875,000 14 Acquisition  (COMM)

$1,750,000 COMM_Key

Chester North Coventry Township

Coventry Woods - Andybur Acquisition

BRC-ACQ-19-13

$195,875.00 $195,000.00 19 Acquisition (COMM)

$391,750.00 COMM_Key

Chester North Coventry Township

Coventry Woods - Andybur Acquisition

BRC-ACQ-19-13

$195,875.00 $195,000.00 19 Acquisition (COMM)

$391,750.00 COMM_Key

Chester North Coventry Township

Coventry Woods - Andybur Acquisition

BRC-ACQ-19-13

$195,875.00 $195,000.00 19 Acquisition (COMM)

$391,750.00 COMM_Key

Page 176: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  176  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Chester North  Coventry  Township

Coventry  Woods  -­‐  Phase  IV(Salyor  Property)

BRC-­‐ACQ-­‐11-­‐182

$71,500 $71,500 11 Acquisition  (COMM)

$143,000 COMM_Key

Chester North  Coventry  Township

Coventry  Woods  Acq.-­‐  Phase  II-­‐-­‐Brown/Barnard  Properties

BRC-­‐ACQ-­‐9-­‐150

$239,000 $205,000 9 Acquisition  (COMM)

$410,000 COMM_Key

Chester North  Coventry  Township

Coventry  Woods  Acquisition-­‐Nueva  Esperanza  Campground

BRC-­‐ACQ-­‐15-­‐144

$390,000 $390,000 15 Acquisition  (COMM)

$780,000 COMM_Key

Chester North  Coventry  Township

Coventry  Woods,  Phase  3

BRC-­‐ACQ-­‐10-­‐187

$124,800 $120,000 10 Acquisition  (COMM)

$249,600 COMM_Key

Chester North  Coventry  Township

Coventryside  Property  Acquisition  (Schuylkill  Highlands)

BRC-­‐ACQ-­‐18-­‐7

$280,000 $259,300 18 Acquisition  (COMM)

$568,600 COMM_Key

Chester North Coventry Township

Customers Bank Property Acquisition

BRC-ACQ-19-14

$90,530.00 $90,500.00 19 Acquisition (COMM)

$181,060.00 COMM_Key

Chester North Coventry Township

Customers Bank Property Acquisition

BRC-ACQ-19-14

$90,530.00 $90,500.00 19 Acquisition (COMM)

$181,060.00 COMM_Key

Chester North Coventry Township

Customers Bank Property Acquisition

BRC-ACQ-19-14

$90,530.00 $90,500.00 19 Acquisition (COMM)

$181,060.00 COMM_Key

Chester North  Coventry  Township

Hill  School  Acquisition  (Coventry  Woods)  Phase  X

BRC-­‐ACQ-­‐14-­‐66

$850,000 $460,000 14 Acquisition  (COMM)

$1,700,000 COMM_Key

Chester North  Coventry  Township

Hurchalla  Property  Acquisition  -­‐  Coventry  Woods

BRC-­‐ACQ-­‐16-­‐24

$430,000 $300,000 16 Acquisition  (COMM)

$860,000 COMM_Key

Page 177: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  177  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Chester North  Coventry  Township

Nueva  Esperanza  Property  Acquisition

BRC-­‐ACQ-­‐12-­‐62

$426,000 $426,000 12 Acquisition  (COMM)

$852,000 COMM_Key

Chester North  Coventry  Township

O'Connor  Property  Acquisition

BRC-­‐ACQ-­‐17-­‐232

$201,700 $150,000 17 Acquisition  (COMM)

$403,400 COMM_Key

Chester North  Coventry  Township

Schuylkill  Highlands  North  Coventry  Trail-­‐  Coventry  Heights

BRC-­‐ACQ-­‐15-­‐46

$140,000 $140,000 15 Acquisition  (COMM)

$280,000 COMM_Key

Chester North  Coventry  Township

Shaner/Kauffman  Properties

BRC-­‐ACQ-­‐13-­‐236

$55,000 $55,000 13 Acquisition  (COMM)

$110,000 COMM_Key

Chester Octorara  Community  Recreation  Commission  

Circuit  Rider BRC-­‐TAG-­‐7-­‐7

$41,200 $63,400 7 Circuit  Rider  (COMM)

$124,200 COMM_Key

Chester Open  Land  Conservancy  of  Chester  County  

Barrett  Land  Acquisition  -­‐  (Diamond  Rock  Preserve  Addition)

BRC-­‐LTA-­‐13.6-­‐614

$194,400 $194,400 13.6 Open  Space  Acquisition  (LT)

$389,800 LT_Key

Chester Open  Land  Conservancy  of  Chester  County  

Valley  Creek  Addition

KEY-­‐LTA-­‐3-­‐18

$101,885 $80,000 3 Open  Space  Acquisition  (LT)

$200,000 LT_Key

Chester Oxford  Area  Recreation  Authority  

Gray  Farm  Master  Site  Plan

BRC-­‐TAG-­‐10-­‐162

$20,000 $20,000 10 Master  Site  Plans  (COMM)

$40,000 COMM_Key

Chester Oxford  Area  Recreation  Authority  

Oxford  Area  Regional  Park

BRC-­‐PRD-­‐13-­‐132

$200,000 $200,000 13 Park  Rehabilitation  and  Development  (COMM)

$500,000 COMM_Key

Page 178: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  178  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Chester Oxford  Borough Moran  Tract-­‐-­‐-­‐-­‐(old)Gray  Property  Acquisition

BRC-­‐ACQ-­‐6-­‐135

$250,000 $250,000 6 Acquisition  (COMM)

$1,016,000 COMM_Key

Chester Oxford  Borough Oxford  Memorial  Park

KEY-­‐SC-­‐2-­‐114

$20,000 $20,000 2 Small  Communities/Small  Projects  (COMM)

$22,500 COMM_Key

Chester Parkesburg  Borough Hery  Tract  Acquisition

BRC-­‐ACQ-­‐8-­‐146

$72,250 $72,000 8 Acquisition  (COMM)

$144,500 COMM_Key

Chester Parkesburg  Borough Hodge  Property KEY-­‐ACQ-­‐4-­‐122

$51,000 $51,000 4 Acquisition  (COMM)

$102,000 COMM_Key

Chester Parkesburg  Borough Minch  Park BRC-­‐PRD-­‐7-­‐147

$100,000 $100,000 7 Park  Rehabilitation  and  Development  (COMM)

$200,000 COMM_Key

Chester Penn  Township Penn  Park  Master  Site  Plan

BRC-­‐TAG-­‐13.3-­‐484

$62,500 $40,000 13.3 Master  Site  Plans  (COMM)

$125,000 COMM_Key

Chester Penn  Township Penn  Township  Community  Park

BRC-­‐PRD-­‐7-­‐151

$250,000 $100,000 7 Park  Rehabilitation  and  Development  (COMM)

$647,000 COMM_Key

Chester Penn  Township Penn  Township  Community  Park

BRC-­‐TAG-­‐6-­‐140

$12,750 $12,700 6 Master  Site  Plans  (COMM)

$25,500 COMM_Key

Chester Pennsbury  Land  Trust,  Inc.  

Haskell  Property  Easement

BRC-­‐LTA-­‐8-­‐13

$194,484 $190,000 8 Critical  Habitat  Acquisition  (LT)

$1,290,734 LT_Key

Chester Pennsbury  Township Master  Site  Plan BRC-­‐TAG-­‐6-­‐142

$9,600 $9,600 6 Master  Site  Plans  (COMM)

$19,200 COMM_Key

Page 179: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  179  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Chester Pennsbury  Township Park  and  Open  Space  Land

KEY-­‐ACQ-­‐3-­‐165

$185,000 $100,000 3 Acquisition  (COMM)

$860,000 COMM_Key

Chester Pennsylvania  Environmental  Council,  Inc.  

Ridley  Creek  Riparian  &  Streambank  Restoration

BRC-­‐RCI-­‐6-­‐11

$19,500 $19,500 6 Implementation  (RIV)

$40,100 RIVER_Key

Chester Phoenix  Iron  Canal  &  Trails  Association  

Feasibility  Study KEY-­‐RTP-­‐95-­‐24

$7,500 $7,500 1 Feasibility  Studies  (RT)

$15,000 RT_Key

Chester Phoenixville  Borough

Community  Park  Acq.

BRC-­‐ACQ-­‐8-­‐154

$495,000 $400,000 8 Acquisition  (COMM)

$1,050,000 COMM_Key

Chester Phoenixville  Borough

Five  Sites KEY-­‐PRD-­‐5-­‐162

$29,200 $49,200 5 Park  Rehabilitation  and  Development  (COMM)

$72,900 COMM_Key

Chester Phoenixville  Borough

Melchiorre  Tract  Park  MSDP

BRC-­‐TAG-­‐10-­‐165

$12,500 $12,500 10 Master  Site  Plans  (COMM)

$25,000 COMM_Key

Chester Phoenixville  Borough

Park  Master  Site  Plans

BRC-­‐TAG-­‐7-­‐155

$30,000 $30,000 7 Master  Site  Plans  (COMM)

$60,000 COMM_Key

Chester Phoenixville  Borough

Thornton  Park BRC-­‐PRD-­‐12-­‐188

$163,400 $60,000 12 Park  Rehabilitation  and  Development  (COMM)

$326,800 COMM_Key

Chester Phoenixville  Borough

Twelve  Sites KEY-­‐PRD-­‐2-­‐123

$105,866 $100,000 2 Park  Rehabilitation  and  Development  (COMM)

$289,666 COMM_Key

Page 180: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  180  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Chester Pocopson  Township Community  Trail  Feasibility  Study

BRC-­‐TAG-­‐11-­‐72

$135,000 $14,000 11 Trail  Study  (COMM)

$433,000 COMM_Key

Chester Sadsbury  Township Bert  Reel  Park KEY-­‐SC-­‐5-­‐175

$19,970 $20,000 5 Small  Communities/Small  Projects  (COMM)

$19,970 COMM_Key

Chester Sadsbury  Township Bert  Reel  Park  Renovation

BRC-­‐PRD-­‐12-­‐195

$60,600 $60,000 12 Park  Rehabilitation  and  Development  (COMM)

$121,300 COMM_Key

Chester Sadsbury  Township Sadsburyville  Playground

KEY-­‐ACQ-­‐1-­‐119

$20,450 $20,000 1 Acquisition  (COMM)

$40,900 COMM_Key

Chester Schuylkill  River  Greenway  Association  

SRT-­‐Thun  Trail  Section  Pedestrian  Bridge

BRC-­‐RCD-­‐7-­‐16

$250,000 $175,000 7 Development  (RIV)

$500,000 RIVER_Key

Chester Schuylkill  Township Valley  Park  Development

BRC-­‐RCD-­‐16-­‐178

$116,400 $116,000 16 Development  (RIV)

$232,801 COMM_Key

Chester South  Coventry  Township

Pughtown  Partnership  Project

BRC-­‐ACQ-­‐6-­‐170

$325,000 $250,000 6 Acquisition  (COMM)

$700,150 COMM_Key

Chester South  Coventry  Township

Town  Forest  Addition

KEY-­‐ACQ-­‐1-­‐129

$26,290 $26,000 1 Acquisition  (COMM)

$102,580 COMM_Key

Chester South  Coventry  Township

Woody's  Woods  Master  Site  and  Conservation  Plan

BRC-­‐TAG-­‐14-­‐241

$21,900 $21,900 14 Master  Site  Plans  (COMM)

$43,800 COMM_Key

Chester South  Coventry  Township

Woody's  Woods  Open  Space  Acquisition

BRC-­‐ACQ-­‐11-­‐186

$70,000 $70,000 11 Acquisition  (COMM)

$140,000 COMM_Key

Page 181: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  181  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Chester The  Nature  Conservancy  

Chrome  Barrens KEY-­‐LTA-­‐3-­‐15

$106,250 $100,000 3 Critical  Habitat  Acquisition  (LT)

$200,000 LT_Key

Chester The  Nature  Conservancy  

Goat  Hill  Barrens KEY-­‐LTA-­‐2-­‐7 $137,500 $136,000 2 Critical  Habitat  Acquisition  (LT)

$272,000 LT_Key

Chester The  Nature  Conservancy  

Nottingham  Barrens KEY-­‐LTA-­‐2-­‐10

$72,500 $65,000 2 Critical  Habitat  Acquisition  (LT)

$130,000 LT_Key

Chester The  Wallace  Trust   Guerra  Property  Acquisition

BRC-­‐LTA-­‐8-­‐19

$102,300 $100,000 8 Critical  Habitat  Acquisition  (LT)

$240,500 LT_Key

Chester The  Wallace  Trust   Hannum  Acquisition BRC-­‐LTA-­‐18-­‐18

$39,000 $27,500 18 Open  Space  Acquisition  (LT)

$78,000 LT_Key

Chester Thornbury  Township Dallett  Tract KEY-­‐ACQ-­‐2-­‐154

$200,000 $175,000 2 Acquisition  (COMM)

$600,000 COMM_Key

Chester Thornbury  Township Spackman  Tract KEY-­‐ACQ-­‐5-­‐201

$290,000 $140,000 5 Acquisition  (COMM)

$666,000 COMM_Key

Chester Thornbury  Township Squire  Cheyney  Park-­‐  Phase  1-­‐  Development

BRC-­‐PRD-­‐17-­‐154

$207,000 $200,000 17 Park  Rehabilitation  and  Development  (COMM)

$414,000 COMM_Key

Chester Thornbury  Township Squire  Cheyney  Pk/Waln  Run  Pk.  Master  Site  Plans

BRC-­‐TAG-­‐11-­‐235

$30,000 $30,000 11 Master  Site  Plans  (COMM)

$60,000 COMM_Key

Chester Tredyffrin  Township Comp.  Rec.,  Park  and  Open  Space  Plan

BRC-­‐TAG-­‐8-­‐191

$26,200 $26,000 8 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$52,500 COMM_Key

Page 182: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  182  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Chester Tredyffrin  Township West  Swedesford  Road  Greenways  Acquisition

BRC-­‐ACQ-­‐10-­‐196

$200,000 $200,000 10 Acquisition  (COMM)

$800,000 COMM_Key

Chester Tredyffrin  Township Westover  Builders  Property  Acquisition

BRC-­‐ACQ-­‐8-­‐192

$100,000 $100,000 8 Acquisition  (COMM)

$720,000 COMM_Key

Chester Tredyffrin  Township Westover  Park  Master  Site  Plan

BRC-­‐TAG-­‐10-­‐173

$21,600 $20,000 10 Master  Site  Plans  (COMM)

$43,100 COMM_Key

Chester Tredyffrin  Township Wilson  Tract KEY-­‐ACQ-­‐3-­‐221

$200,000 $100,000 3 Acquisition  (COMM)

$2,700,000 COMM_Key

Chester Upper  Oxford  Township

Stankywicz  Estate  Acquisition

BRC-­‐ACQ-­‐11-­‐188

$104,000 $104,000 11 Acquisition  (COMM)

$423,000 COMM_Key

Chester Upper  Uwchlan  Township

Community-­‐wide  Trail  Network  Feasibility  Study

BRC-­‐TAG-­‐8-­‐204

$31,200 $30,000 8 Trail  Study  (COMM)

$67,400 COMM_Key

Chester Upper  Uwchlan  Township

Hickory  Park KEY-­‐PRD-­‐4-­‐157

$25,000 $25,000 4 Park  Rehabilitation  and  Development  (COMM)

$50,000 COMM_Key

Chester Uwchlan  Township Walking  Trail KEY-­‐PRD-­‐2-­‐161

$100,000 $100,000 2 Park  Rehabilitation  and  Development  (COMM)

$433,800 COMM_Key

Chester Valley  Township Comprehensive  Recreation,  Open  Space  and  Greenway  Plan

BRC-­‐TAG-­‐16-­‐74

$20,000 $20,000 16 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$40,000 COMM_Key

Chester Wallace  Township Community  Park KEY-­‐ACQ-­‐4-­‐163

$125,000 $100,000 4 Acquisition  (COMM)

$570,000 COMM_Key

Page 183: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  183  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Chester Wallace  Township Community  Park  Master  Site  Plan

KEY-­‐TAG-­‐5-­‐210

$20,625 $20,600 5 Master  Site  Plans  (COMM)

$41,250 COMM_Key

Chester Wallace  Township Wagenseller  Park KEY-­‐SC-­‐1-­‐142

$7,120 $7,100 1 Small  Communities/Small  Projects  (COMM)

$11,200 COMM_Key

Chester West  Bradford  Township

Broad  Run  Park KEY-­‐PRD-­‐3-­‐230

$559,000 $100,000 3 Park  Rehabilitation  and  Development  (COMM)

$1,118,000 COMM_Key

Chester West  Bradford  Township

East  Branch  Brandywine  Trail

BRC-­‐PRD-­‐14-­‐181

$100,000 $100,000 14 Park  Rehabilitation  and  Development  (COMM)

$1,653,400 COMM_Key

Chester West  Bradford  Township

Lammey  Park  Master  Plan

KEY-­‐TAG-­‐1-­‐145

$10,950 $10,900 1 Master  Site  Plans  (COMM)

$21,900 COMM_Key

Chester West  Bradford  Township

Shadyside  Park BRC-­‐PRD-­‐7-­‐206

$200,000 $100,000 7 Park  Rehabilitation  and  Development  (COMM)

$1,368,335 COMM_Key

Chester West  Brandywine  Township

Master  Site  Development  Plan

KEY-­‐TAG-­‐3-­‐231

$10,000 $10,000 3 Master  Site  Plans  (COMM)

$20,000 COMM_Key

Chester West  Brandywine  Township

Municipal  Park KEY-­‐ACQ-­‐2-­‐170

$105,750 $70,000 2 Acquisition  (COMM)

$289,800 COMM_Key

Page 184: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  184  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Chester West  Brandywine  Township

West  Brandywine  Township  Community  Park

BRC-­‐PRD-­‐7-­‐207

$261,315 $100,000 7 Park  Rehabilitation  and  Development  (COMM)

$782,580 COMM_Key

Chester West  Caln  Township Layton  Property KEY-­‐ACQ-­‐5-­‐220

$150,000 $150,000 5 Acquisition  (COMM)

$700,000 COMM_Key

Chester West  Chester  Borough

John  O.  Green  Park  -­‐  Phase  2

BRC-­‐PRD-­‐11-­‐98

$48,800 $48,000 11 Park  Rehabilitation  and  Development  (COMM)

$97,600 COMM_Key

Chester West  Chester  Borough

Park  Improvements  -­‐  Seven  Sites

KEY-­‐PRD-­‐1-­‐146

$36,490 $36,400 1 Park  Rehabilitation  and  Development  (COMM)

$72,990 COMM_Key

Chester West  Chester  Borough

PECO  Property  Tot  Lot

KEY-­‐PRD-­‐4-­‐167

$112,800 $100,000 4 Park  Rehabilitation  and  Development  (COMM)

$257,800 COMM_Key

Chester West  Fallowfield  Township

Octorara  Area  Reg.  Rec.  Circuit  Rider  -­‐  Year  1

KEY-­‐TAG-­‐5-­‐222

$40,000 $40,000 5 Circuit  Rider  (COMM)

$40,000 COMM_Key

Chester West  Fallowfield  Township

Peer-­‐to-­‐Peer KEY-­‐TAG-­‐4-­‐168

$7,500 $7,500 4 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$8,400 COMM_Key

Page 185: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  185  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Chester West  Goshen  Township

Community  Park  -­‐  Phase  I

KEY-­‐PRD-­‐1-­‐147

$182,495 $100,000 1 Park  Rehabilitation  and  Development  (COMM)

$667,245 COMM_Key

Chester West  Goshen  Township

Freedley  Field KEY-­‐ACQ-­‐4-­‐169

$90,000 $50,000 4 Acquisition  (COMM)

$180,000 COMM_Key

Chester West  Grove  Borough Memorial  Park KEY-­‐SC-­‐5-­‐223

$20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$23,986 COMM_Key

Chester West  Nantmeal  Township

Township  Park  -­‐  Development

BRC-­‐SC-­‐17-­‐50

$40,000 $40,000 17 Small  Communities/Small  Projects  (COMM)

$70,400 COMM_Key

Chester West Pikeland Township

Opperman's Corner Acquisition

BRC-ACQ-19-17

########## ########## 19 Acquisition (COMM)

$5,232,200.00 COMM_Key

Chester West Pikeland Township

Opperman's Corner Acquisition

BRC-ACQ-19-17

########## ########## 19 Acquisition (COMM)

$5,232,200.00 COMM_Key

Chester West Pikeland Township

Opperman's Corner Acquisition

BRC-ACQ-19-17

########## ########## 19 Acquisition (COMM)

$5,232,200.00 COMM_Key

Chester West  Sadsbury  Township

Zion  Hill  &  Zook  Roads  Acquisition

BRC-­‐ACQ-­‐9-­‐231

$121,200 $110,000 9 Acquisition  (COMM)

$242,300 COMM_Key

Chester West Whiteland Township

Exton Park Master Site Plan Update

BRC-TAG-19-209

$39,602.50 $33,000.00 19 Master Site Plans (COMM)

$79,205.00 COMM_Key

Chester West Whiteland Township

Exton Park Master Site Plan Update

BRC-TAG-19-209

$39,602.50 $33,000.00 19 Master Site Plans (COMM)

$79,205.00 COMM_Key

Chester West Whiteland Township

Exton Park Master Site Plan Update

BRC-TAG-19-209

$39,602.50 $33,000.00 19 Master Site Plans (COMM)

$79,205.00 COMM_Key

Chester White  Clay  Watershed  Association  

Mason  Dixon  Greenway  Study

KEY-­‐LTP-­‐2-­‐15

$1,250 $1,200 2 Open  Space  Planning  (LT)

$2,400 LT_Key

Page 186: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  186  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Chester White  Clay  Watershed  Association  

White  Clay  Creek  Watershed  Cons.  Plan

KEY-­‐RCP-­‐95-­‐19

$10,100 $10,100 1 Planning  (RIV) $20,200 RIVER_Key

Chester Willistown  Conservation  Trust,  Inc.  

Ashbridge  Preserve  Acquisition

BRC-­‐LTA-­‐8-­‐21

$1,650,000 $1,350,000 8 Critical  Habitat  Acquisition  (LT)

$3,300,000 LT_Key

Chester Willistown  Conservation  Trust,  Inc.  

Kirkwood  Preserve  Acquisition

BRC-­‐LTA-­‐11-­‐28

$750,000 $500,000 11 Open  Space  Acquisition  (LT)

$5,038,000 LT_Key

Chester Willistown  Conservation  Trust,  Inc.  

Penns  Preserve  Park  renamed:    Okehocking  Preserve

BRC-­‐LTA-­‐7-­‐26

$750,000 $750,000 7 Open  Space  Acquisition  (LT)

$1,825,940 LT_Key

Chester Willistown  Conservation  Trust,  Inc.  

Rushton  Woods  Preserve  Addition  Land  Acquisition

BRC-­‐LTA-­‐15-­‐125

$1,679,220 $500,000 15 Open  Space  Acquisition  (LT)

$4,550,000 LT_Key

Chester Willistown Conservation Trust, Inc.

White Farmhouse Parcel Acquisition

BRC-LTA-19-33

$137,500.00 $137,500.00 19 Open Space Acquisition (LT)

$705,000.00 LT_Key

Chester Willistown Conservation Trust, Inc.

White Farmhouse Parcel Acquisition

BRC-LTA-19-33

$137,500.00 $137,500.00 19 Open Space Acquisition (LT)

$705,000.00 LT_Key

Chester Willistown Conservation Trust, Inc.

White Farmhouse Parcel Acquisition

BRC-LTA-19-33

$137,500.00 $137,500.00 19 Open Space Acquisition (LT)

$705,000.00 LT_Key

Chester Willistown  Township Okehocking  Nature  Center

BRC-­‐TAG-­‐13-­‐211

$52,000 $52,000 13 Feasibility  Studies  (COMM)

$106,300 COMM_Key

Chester Willistown  Township Okehocking  Preserve  -­‐  Phase  3  Acquisition

BRC-­‐ACQ-­‐11.5-­‐16

$500,000 $500,000 11.5 Acquisition  (COMM)

$1,500,000 COMM_Key

Page 187: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  187  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Chester Willistown  Township Okehocking  Preserve  Management  Plan

BRC-­‐TAG-­‐8-­‐220

$19,700 $19,000 8 Conservation/Sound  Land  Use  (COMM)

$39,500 COMM_Key

Chester,  Delaware

Chester-­‐Ridley-­‐Crum  Watersheds  Association  

Crum  Creek  Watershed  Conservation  Plan

BRC-­‐RCP-­‐9-­‐5

$79,500 $70,000 9 Planning  (RIV) $159,100 RIVER_Key

Chester,  Delaware

Pennsylvania  Environmental  Council,  Inc.  

Chester  Creek  Watershed  Plan

KEY-­‐RCP-­‐96-­‐01

$60,000 $60,000 3 Planning  (RIV) $120,000 RIVER_Key

Chester,  Delaware,  Montgomery

Natural  Lands  Trust,  Inc.  

Preserve  Recreation  Planning  Project

BRC-­‐LTP-­‐12.5-­‐16

$55,000 $50,000 12.5 Open  Space  Planning  (LT)

$154,900 LT_Key

Chester,  Montgomery

Pottstown  Metropolitan  Regional  Planning  Committee  

Pottstown  Region  Parks  2013  Mini-­‐Grants

BRC-­‐SR-­‐18-­‐131

$100,000 $100,000 18 Partnerships  Projects

$200,000 COMM_Key

Clarion Allegheny  Valley  Trails  Association  

Allegheny  River  Trail  Extension  -­‐  Foxburg  to  Parker

BRC-­‐RTD-­‐13-­‐11

$300,000 $300,000 13 Rail  Rehabilitation  and  Development  (RT)

$600,000 RT_Key

Clarion Allegheny  Valley  Trails  Association  

Foxburg  to  Parker  Rail-­‐Trail  Gap  Acquisition

BRC-­‐RTA-­‐13.3-­‐15

$58,000 $58,000 13.3 Acquisition  (RT) $116,000 RT_Key

Clarion Armstrong  County  Conservancy  Charitable  Trust  

McCandless  Land  Acquisition

BRC-­‐LTA-­‐13.6-­‐608

$112,900 $112,000 13.6 Open  Space  Acquisition  (LT)

$225,700 LT_Key

Page 188: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  188  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Clarion Clarion  Borough Clarion  Borough  2007  Rec,  Park  &  Open  Space  Plan  and  Pool  FS

BRC-­‐TAG-­‐13.3-­‐262

$30,000 $30,000 13.3 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$60,000 COMM_Key

Clarion Clarion Borough Clarion Borough Municipal Pool Development

BRC-PRD-19-68

$35,235.00 $35,200.00 19 Park Rehabilitation and Development (COMM)

$70,470.00 COMM_Key

Clarion Clarion Borough Clarion Borough Municipal Pool Development

BRC-PRD-19-68

$35,235.00 $35,200.00 19 Park Rehabilitation and Development (COMM)

$70,470.00 COMM_Key

Clarion Clarion Borough Clarion Borough Municipal Pool Development

BRC-PRD-19-68

$35,235.00 $35,200.00 19 Park Rehabilitation and Development (COMM)

$70,470.00 COMM_Key

Clarion Clarion  Borough Comprehensive  Recreation  &  Park  Plan

KEY-­‐TAG-­‐1-­‐31

$7,000 $7,000 1 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$14,500 COMM_Key

Clarion Clarion  Borough Toby  Boat  Launch  Area

BRC-­‐PRD-­‐14-­‐127

$212,400 $55,700 14 Park  Rehabilitation  and  Development  (COMM)

$424,700 COMM_Key

Clarion Clarion  Borough Weaver  Community  Park

KEY-­‐PRD-­‐4-­‐30

$50,000 $50,000 4 Park  Rehabilitation  and  Development  (COMM)

$111,759 COMM_Key

Page 189: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  189  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Clarion Clarion  County Community  Park BRC-­‐PRD-­‐7-­‐37

$55,000 $50,000 7 Park  Rehabilitation  and  Development  (COMM)

$110,000 COMM_Key

Clarion Clarion  County Kids  Court  Playground

BRC-­‐PRD-­‐6-­‐39

$11,000 $11,000 6 Park  Rehabilitation  and  Development  (COMM)

$22,000 COMM_Key

Clarion Clarion  County Park  Lighting BRC-­‐PRD-­‐12-­‐138

$33,400 $33,400 12 Park  Rehabilitation  and  Development  (COMM)

$66,900 COMM_Key

Clarion Clarion  Township Clarion  Township/C-­‐L  School  Playground  Enhancement

BRC-­‐SC-­‐8-­‐42

$30,000 $30,000 8 Small  Communities/Small  Projects  (COMM)

$40,000 COMM_Key

Clarion East  Brady  Borough Community  Park  Skate  Park

BRC-­‐SC-­‐12-­‐91

$40,000 $40,000 12 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Clarion East  Brady  Borough East  Brady  Playground

BRC-­‐SC-­‐11-­‐116

$24,100 $24,100 11 Small  Communities/Small  Projects  (COMM)

$28,400 COMM_Key

Clarion East  Brady  Borough East  Brady  Recreation  Complex  -­‐  Phase  4-­‐  Development

BRC-­‐SC-­‐18-­‐28

$40,000 $40,000 18 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Page 190: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  190  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Clarion East Brady Borough East Brady Recreation Complex- Phase 5- Development

BRC-SC-19-39

$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)

$60,001.00 COMM_Key

Clarion East Brady Borough East Brady Recreation Complex- Phase 5- Development

BRC-SC-19-39

$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)

$60,001.00 COMM_Key

Clarion East Brady Borough East Brady Recreation Complex- Phase 5- Development

BRC-SC-19-39

$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)

$60,001.00 COMM_Key

Clarion East  Brady  Borough Feasibility  Study KEY-­‐TAG-­‐1-­‐39

$9,775 $9,700 1 Feasibility  Studies  (COMM)

$19,550 COMM_Key

Clarion East  Brady  Borough Playground BRC-­‐PRD-­‐9-­‐66

$59,200 $40,000 9 Park  Rehabilitation  and  Development  (COMM)

$118,400 COMM_Key

Clarion Farmington  Township

Community  Park  Complex

BRC-­‐ACQ-­‐6-­‐64

$47,200 $47,000 6 Acquisition  (COMM)

$145,400 COMM_Key

Clarion Farmington  Township

Community  Park  Complex

BRC-­‐TAG-­‐7-­‐72

$20,000 $20,000 7 Master  Site  Plans  (COMM)

$40,000 COMM_Key

Clarion Farmington  Township

Community  Park  Development

BRC-­‐PRD-­‐12-­‐55

$100,000 $100,000 12 Park  Rehabilitation  and  Development  (COMM)

$200,000 COMM_Key

Clarion Limestone  Township Limestone  Township  Playground

BRC-­‐SC-­‐9-­‐118

$20,000 $21,000 9 Small  Communities/Small  Projects  (COMM)

$24,300 COMM_Key

Page 191: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  191  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Clarion Paint  Township Community  Flower  Garden

KEY-­‐SC-­‐5-­‐154

$10,600 $10,000 5 Small  Communities/Small  Projects  (COMM)

$19,992 COMM_Key

Clarion Penn  Soil  Conservancy  Charitable  Trust  

Scrubgrass  Creek  Watershed

KEY-­‐RCP-­‐96-­‐16

$30,000 $30,000 3 Planning  (RIV) $60,000 RIVER_Key

Clarion Perry  Township David  Wetzel  Memorial  Park

BRC-­‐SC-­‐13.3-­‐315

$21,100 $21,000 13.3 Small  Communities/Small  Projects  (COMM)

$38,200 COMM_Key

Clarion Perry  Township David  Wetzel  Memorial  Park  and  Ballfield

BRC-­‐SC-­‐11-­‐147

$25,600 $25,000 11 Small  Communities/Small  Projects  (COMM)

$31,100 COMM_Key

Clarion Redbank  Valley  Park  Authority  

Peer  to  Peer KEY-­‐TAG-­‐3-­‐183

$6,750 $6,750 3 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$7,500 COMM_Key

Clarion Redbank  Valley  Park  Authority  

Redbank  Valley  Park KEY-­‐PRD-­‐3-­‐182

$15,000 $15,000 3 Park  Rehabilitation  and  Development  (COMM)

$30,000 COMM_Key

Clarion Redbank  Valley  Park  Commission  

Circuit  Rider BRC-­‐TAG-­‐10-­‐200

$12,832 $12,800 10 Circuit  Rider  (COMM)

$39,600 COMM_Key

Clarion Redbank  Valley  Park  Commission  

Circuit  Rider KEY-­‐TAG-­‐6-­‐4

$30,000 $30,000 6 Circuit  Rider  (COMM)

$30,000 COMM_Key

Clarion Redbank  Valley  Park  Commission  

Master  Site  Plan  &  Feasibility  Study

BRC-­‐TAG-­‐13-­‐202

$12,500 $12,500 13 Master  Site  Plans  (COMM)

$25,000 COMM_Key

Page 192: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  192  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Clarion Redbank  Valley  Park  Commission  

Municipal  Park BRC-­‐PRD-­‐10-­‐135

$28,700 $28,700 10 Park  Rehabilitation  and  Development  (COMM)

$37,400 COMM_Key

Clarion Redbank  Valley  Park  Commission  

Redbank  Valley  Municipal  Park

BRC-­‐PRD-­‐13.3-­‐420

$60,200 $60,200 13.3 Park  Rehabilitation  and  Development  (COMM)

$120,400 COMM_Key

Clarion Salem  Township Park  Expansion KEY-­‐ACQ-­‐4-­‐132

$17,475 $17,000 4 Acquisition  (COMM)

$34,950 COMM_Key

Clarion Sligo  Borough Recreation  Center BRC-­‐PRD-­‐10-­‐137

$119,400 $100,000 10 Park  Rehabilitation  and  Development  (COMM)

$238,710 COMM_Key

Clarion Sligo  Borough Recreation  Center  Renovation

BRC-­‐SC-­‐9-­‐188

$37,600 $380,000 9 Small  Communities/Small  Projects  (COMM)

$55,300 COMM_Key

Clarion Sligo  Borough Save  the  Pool  Project BRC-­‐TAG-­‐8-­‐177

$7,500 $7,500 8 Feasibility  Studies  (COMM)

$15,000 COMM_Key

Clarion St.  Petersburg  Borough

Borough  Park KEY-­‐SC-­‐5-­‐190

$17,659 $17,700 5 Small  Communities/Small  Projects  (COMM)

$21,759 COMM_Key

Page 193: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  193  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Clarion St.  Petersburg  Borough

St.  Petersburg  Park BRC-­‐SC-­‐8-­‐187

$30,000 $30,000 8 Small  Communities/Small  Projects  (COMM)

$40,000 COMM_Key

Clarion Strattanville  Borough

Magic  Square  Park KEY-­‐SC-­‐3-­‐208

$15,000 $15,000 3 Small  Communities/Small  Projects  (COMM)

$22,000 COMM_Key

Clarion Union  Area  Council  of  Governments  

Union  COG-­‐  Sligo  Pool

BRC-­‐PRD-­‐14-­‐25

$70,000 $30,000 14 Park  Rehabilitation  and  Development  (COMM)

$140,000 COMM_Key

Clarion, Crawford, Erie, Forest, Lawrence, Mercer, Venango, Warren

Northwest Pennsylvania Regional Planning & Development Commission

Northwest PA Greenway Plan Implementation 2014

BRC-SR-19-178

$150,000.00 $100,000.00 19 Partnerships Projects

$450,000.00 COMM_Key

Clarion, Crawford, Erie, Forest, Lawrence, Mercer, Venango, Warren

Northwest Pennsylvania Regional Planning & Development Commission

Northwest PA Greenway Plan Implementation 2014

BRC-SR-19-178

$150,000.00 $100,000.00 19 Partnerships Projects

$450,000.00 COMM_Key

Clarion, Crawford, Erie, Forest, Lawrence, Mercer, Venango, Warren

Northwest Pennsylvania Regional Planning & Development Commission

Northwest PA Greenway Plan Implementation 2014

BRC-SR-19-178

$150,000.00 $100,000.00 19 Partnerships Projects

$450,000.00 COMM_Key

Page 194: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  194  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Clarion, Crawford, Erie, Forest, Lawrence, Mercer, Venango, Warren

Northwest Pennsylvania Regional Planning & Development Commission

Northwest PA Greenway Plan Implementation 2014

BRC-SR-19-178

$150,000.00 $100,000.00 19 Partnerships Projects

$450,000.00 COMM_Key

Clarion, Crawford, Erie, Forest, Lawrence, Mercer, Venango, Warren

Northwest Pennsylvania Regional Planning & Development Commission

Northwest PA Greenway Plan Implementation 2014

BRC-SR-19-178

$150,000.00 $100,000.00 19 Partnerships Projects

$450,000.00 COMM_Key

Clarion, Crawford, Erie, Forest, Lawrence, Mercer, Venango, Warren

Northwest Pennsylvania Regional Planning & Development Commission

Northwest PA Greenway Plan Implementation 2014

BRC-SR-19-178

$150,000.00 $100,000.00 19 Partnerships Projects

$450,000.00 COMM_Key

Clarion, Crawford, Erie, Forest, Lawrence, Mercer, Venango, Warren

Northwest Pennsylvania Regional Planning & Development Commission

Northwest PA Greenway Plan Implementation 2014

BRC-SR-19-178

$150,000.00 $100,000.00 19 Partnerships Projects

$450,000.00 COMM_Key

Clarion, Crawford, Erie, Forest, Lawrence, Mercer, Venango, Warren

Northwest Pennsylvania Regional Planning & Development Commission

Northwest PA Greenway Plan Implementation 2014

BRC-SR-19-178

$150,000.00 $100,000.00 19 Partnerships Projects

$450,000.00 COMM_Key

Page 195: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  195  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Clarion, Crawford, Erie, Forest, Lawrence, Mercer, Venango, Warren

Northwest Pennsylvania Regional Planning & Development Commission

Northwest PA Greenway Plan Implementation 2014

BRC-SR-19-178

$150,000.00 $100,000.00 19 Partnerships Projects

$450,000.00 COMM_Key

Clarion, Crawford, Erie, Forest, Lawrence, Mercer, Venango, Warren

Northwest Pennsylvania Regional Planning & Development Commission

Northwest PA Greenway Plan Implementation 2014

BRC-SR-19-178

$150,000.00 $100,000.00 19 Partnerships Projects

$450,000.00 COMM_Key

Clarion, Crawford, Erie, Forest, Lawrence, Mercer, Venango, Warren

Northwest Pennsylvania Regional Planning & Development Commission

Northwest PA Greenway Plan Implementation 2014

BRC-SR-19-178

$150,000.00 $100,000.00 19 Partnerships Projects

$450,000.00 COMM_Key

Clarion, Crawford, Erie, Forest, Lawrence, Mercer, Venango, Warren

Northwest Pennsylvania Regional Planning & Development Commission

Northwest PA Greenway Plan Implementation 2014

BRC-SR-19-178

$150,000.00 $100,000.00 19 Partnerships Projects

$450,000.00 COMM_Key

Clarion, Crawford, Erie, Forest, Lawrence, Mercer, Venango, Warren

Northwest Pennsylvania Regional Planning & Development Commission

Northwest PA Greenway Plan Implementation 2014

BRC-SR-19-178

$150,000.00 $100,000.00 19 Partnerships Projects

$450,000.00 COMM_Key

Page 196: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  196  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Clarion, Crawford, Erie, Forest, Lawrence, Mercer, Venango, Warren

Northwest Pennsylvania Regional Planning & Development Commission

Northwest PA Greenway Plan Implementation 2014

BRC-SR-19-178

$150,000.00 $100,000.00 19 Partnerships Projects

$450,000.00 COMM_Key

Clarion, Crawford, Erie, Forest, Lawrence, Mercer, Venango, Warren

Northwest Pennsylvania Regional Planning & Development Commission

Northwest PA Greenway Plan Implementation 2014

BRC-SR-19-178

$150,000.00 $100,000.00 19 Partnerships Projects

$450,000.00 COMM_Key

Clarion, Crawford, Erie, Forest, Lawrence, Mercer, Venango, Warren

Northwest Pennsylvania Regional Planning & Development Commission

Northwest PA Greenway Plan Implementation 2014

BRC-SR-19-178

$150,000.00 $100,000.00 19 Partnerships Projects

$450,000.00 COMM_Key

Clarion, Crawford, Erie, Forest, Lawrence, Mercer, Venango, Warren

Northwest Pennsylvania Regional Planning & Development Commission

Northwest PA Greenway Plan Implementation 2014

BRC-SR-19-178

$150,000.00 $100,000.00 19 Partnerships Projects

$450,000.00 COMM_Key

Clarion, Crawford, Erie, Forest, Lawrence, Mercer, Venango, Warren

Northwest Pennsylvania Regional Planning & Development Commission

Northwest PA Greenway Plan Implementation 2014

BRC-SR-19-178

$150,000.00 $100,000.00 19 Partnerships Projects

$450,000.00 COMM_Key

Page 197: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  197  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Clarion, Crawford, Erie, Forest, Lawrence, Mercer, Venango, Warren

Northwest Pennsylvania Regional Planning & Development Commission

Northwest PA Greenway Plan Implementation 2014

BRC-SR-19-178

$150,000.00 $100,000.00 19 Partnerships Projects

$450,000.00 COMM_Key

Clarion, Crawford, Erie, Forest, Lawrence, Mercer, Venango, Warren

Northwest Pennsylvania Regional Planning & Development Commission

Northwest PA Greenway Plan Implementation 2014

BRC-SR-19-178

$150,000.00 $100,000.00 19 Partnerships Projects

$450,000.00 COMM_Key

Clarion, Crawford, Erie, Forest, Lawrence, Mercer, Venango, Warren

Northwest Pennsylvania Regional Planning & Development Commission

Northwest PA Greenway Plan Implementation 2014

BRC-SR-19-178

$150,000.00 $100,000.00 19 Partnerships Projects

$450,000.00 COMM_Key

Clarion, Crawford, Erie, Forest, Lawrence, Mercer, Venango, Warren

Northwest Pennsylvania Regional Planning & Development Commission

Northwest PA Greenway Plan Implementation 2014

BRC-SR-19-178

$150,000.00 $100,000.00 19 Partnerships Projects

$450,000.00 COMM_Key

Clarion,  Crawford,  Erie,  Forest,  Lawrence,  Mercer,  Venango,  Warren

Northwest  Pennsylvania  Regional  Planning  &  Development  Commission  

Northwest  Pennsylvania  Greenways  Implementation  Grant

BRC-­‐TAG-­‐16-­‐67

$100,000 $55,100 16 Education  and  Training  (COMM)

$220,000 RIVER_Key

Page 198: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  198  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Clarion,  Crawford,  Erie,  Forest,  Lawrence,  Mercer,  Venango,  Warren

Northwest  Pennsylvania  Regional  Planning  &  Development  Commission  

Northwest  Pennsylvania  Greenways  Implementation  Grant

BRC-­‐TAG-­‐16-­‐67

$100,000 $174,900 16 Education  and  Training  (COMM)

$220,000 COMM_Key

Clarion,  Jefferson

Tri  County  Rails  To  Trails  Association  

Brockway  to  Piney  Trail

BRC-­‐RTA-­‐10-­‐13

$100,000 $100,000 10 Acquisition  (RT) $500,000 RT_Key

Clearfield Bigler  Township Madera  School  Park  (aka  B  &  B  Park)

BRC-­‐SC-­‐13.3-­‐337

$64,000 $40,000 13.3 Small  Communities/Small  Projects  (COMM)

$128,000 COMM_Key

Clearfield Boggs  Township Community  Park  -­‐  Phase  1  -­‐  Development

BRC-­‐SC-­‐18-­‐26

$40,000 $40,000 18 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Clearfield Bradford  Township Community  Park  Playground

BRC-­‐SC-­‐9-­‐29

$20,000 $20,000 9 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Clearfield Brady  Township Community  Park KEY-­‐SC-­‐1-­‐17 $20,000 $20,000 1 Small  Communities/Small  Projects  (COMM)

$29,025 COMM_Key

Clearfield Burnside  Township Township  Park KEY-­‐SC-­‐3-­‐27 $8,404 $8,000 3 Small  Communities/Small  Projects  (COMM)

$19,047 COMM_Key

Page 199: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  199  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Clearfield Clearfield  Borough Bucky  Strunk  Memorial  Softball  Field  Acquisition

BRC-­‐ACQ-­‐12.5-­‐14

$29,300 $29,300 12.5 Acquisition  (COMM)

$58,600 COMM_Key

Clearfield Clearfield  Borough Bucky  Strunk  Memorial  Softball  Field  Master  Site  Plan

BRC-­‐TAG-­‐13.3-­‐463

$6,000 $6,000 13.3 Master  Site  Plans  (COMM)

$12,000 COMM_Key

Clearfield Clearfield  Borough Lower  Witmer  Park  Boat  Launch

BRC-­‐PRD-­‐13-­‐96

$20,000 $20,000 13 Park  Rehabilitation  and  Development  (COMM)

$40,000 COMM_Key

Clearfield Clearfield  Borough Parks  and  Riverfront  Master  Site  Plan

BRC-­‐TAG-­‐12.5-­‐1

$18,500 $18,500 12.5 Master  Site  Plans  (COMM)

$37,000 COMM_Key

Clearfield Clearfield  Borough Upper  Witmer  Park BRC-­‐PRD-­‐14-­‐128

$190,100 $150,000 14 Park  Rehabilitation  and  Development  (COMM)

$388,000 COMM_Key

Clearfield Clearfield  County Curwensville  Lake  Authority  Master  Site  Plan

BRC-­‐TAG-­‐15-­‐89

$25,000 $25,000 15 Master  Site  Plans  (COMM)

$50,000 COMM_Key

Clearfield Clearfield  County Curwensville  Lake  Park  -­‐  Development

BRC-­‐PRD-­‐17-­‐111

$12,807 $13,000 17 Park  Rehabilitation  and  Development  (COMM)

$26,000 COMM_Key

Page 200: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  200  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Clearfield Clearfield  County Peer-­‐to-­‐Peer BRC-­‐TAG-­‐12-­‐1

$10,000 $10,000 12 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$11,000 COMM_Key

Clearfield Clearfield  County  Municipal  Services  &  Recreation  Authority  

Camp  Wopsononock  MSDP

KEY-­‐TAG-­‐4-­‐32

$20,000 $20,000 4 Master  Site  Plans  (COMM)

$40,000 COMM_Key

Clearfield Clearfield  County  Municipal  Services  &  Recreation  Authority  

Curwensville  Dam  Campground

KEY-­‐PRD-­‐2-­‐30

$7,000 $7,000 2 Park  Rehabilitation  and  Development  (COMM)

$14,000 COMM_Key

Clearfield Clearfield  County  Municipal  Services  &  Recreation  Authority  

Curwensville  Lake  Recreation  Area

KEY-­‐PRD-­‐4-­‐31

$100,000 $31,500 4 Park  Rehabilitation  and  Development  (COMM)

$227,000 COMM_Key

Clearfield Clearfield  County  Rails  to  Trails  Association  

Grampian  Line  Rail-­‐Trail

KEY-­‐RTD-­‐3-­‐4

$175,000 $100,000 3 Rail  Rehabilitation  and  Development  (RT)

$200,000 RT_Key

Clearfield Clearfield  County  Rails  to  Trails  Association  

Grampian  Line  Trail  Section

BRC-­‐RTD-­‐12-­‐7

$12,200 $12,200 12 Rail  Rehabilitation  and  Development  (RT)

$24,400 RT_Key

Page 201: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  201  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Clearfield Curwensville  Borough

Irvin  Park BRC-­‐SC-­‐7-­‐46

$40,000 $40,000 7 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Clearfield Curwensville  Borough

Irvin  Park  Improvements

BRC-­‐SC-­‐12-­‐89

$32,500 $32,500 12 Small  Communities/Small  Projects  (COMM)

$45,000 COMM_Key

Clearfield Decatur  Township Fairview  Park BRC-­‐SC-­‐6-­‐50

$20,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$24,396 COMM_Key

Clearfield Decatur  Township Fairview  Park  Phase  II-­‐Development

BRC-­‐SC-­‐15-­‐78

$40,000 $40,000 15 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Clearfield DuBois  City Memorial  Park BRC-­‐PRD-­‐12-­‐147

$63,400 $63,400 12 Park  Rehabilitation  and  Development  (COMM)

$126,800 COMM_Key

Clearfield DuBois  City Memorial  Park BRC-­‐PRD-­‐7-­‐52

$52,875 $50,000 7 Park  Rehabilitation  and  Development  (COMM)

$105,750 COMM_Key

Clearfield DuBois  City Memorial  Park KEY-­‐PRD-­‐2-­‐39

$55,000 $55,000 2 Park  Rehabilitation  and  Development  (COMM)

$110,000 COMM_Key

Page 202: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  202  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Clearfield DuBois  City Memorial  Park KEY-­‐PRD-­‐5-­‐49

$55,300 $55,300 5 Park  Rehabilitation  and  Development  (COMM)

$110,600 COMM_Key

Clearfield DuBois  City Memorial  Park  Restrooms

BRC-­‐PRD-­‐11-­‐25

$30,000 $30,000 11 Park  Rehabilitation  and  Development  (COMM)

$60,000 COMM_Key

Clearfield DuBois  City Memorial  Park  Swimming  Pool

KEY-­‐PRD-­‐1-­‐38

$233,200 $150,000 1 Park  Rehabilitation  and  Development  (COMM)

$466,400 COMM_Key

Clearfield DuBois  City Sandy  Lick  Creek  Recreation  Area

BRC-­‐PRD-­‐13.3-­‐351

$141,900 $141,900 13.3 Park  Rehabilitation  and  Development  (COMM)

$283,800 COMM_Key

Clearfield DuBois  City Sandy  Lick  Creek  Recreation  Area

BRC-­‐TAG-­‐13-­‐182

$20,000 $20,000 13 Master  Site  Plans  (COMM)

$40,000 COMM_Key

Clearfield DuBois  City Sandy  Lick  Creek  Recreation  Area  Trails  -­‐  Phase  II

BRC-­‐PRD-­‐16-­‐220

$171,800 $171,800 16 Park  Rehabilitation  and  Development  (COMM)

$343,600 COMM_Key

Page 203: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  203  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Clearfield DuBois  City Showers  Field  -­‐  Phase  2-­‐Development

BRC-­‐PRD-­‐18-­‐64

$200,000 $200,000 18 Park  Rehabilitation  and  Development  (COMM)

$538,000 COMM_Key

Clearfield Ferguson  Township Playground BRC-­‐SC-­‐9-­‐76

$22,500 $22,000 9 Small  Communities/Small  Projects  (COMM)

$25,300 COMM_Key

Clearfield Grampian  Borough Community  Park BRC-­‐SC-­‐9-­‐86

$20,000 $21,000 9 Small  Communities/Small  Projects  (COMM)

$22,700 COMM_Key

Clearfield Grampian  Borough Grampian  Penn  Bloom  Community  Park

KEY-­‐SC-­‐5-­‐72 $14,126 $14,100 5 Small  Communities/Small  Projects  (COMM)

$14,646 COMM_Key

Clearfield Gulich  Township Mountz  Memorial  Park

KEY-­‐SC-­‐2-­‐56 $19,695 $19,600 2 Small  Communities/Small  Projects  (COMM)

$25,695 COMM_Key

Clearfield Gulich  Township Mountz  Memorial  Park

KEY-­‐SC-­‐3-­‐79 $20,000 $20,000 3 Small  Communities/Small  Projects  (COMM)

$23,500 COMM_Key

Clearfield Gulich  Township Mountz  Memorial  Park  Addition

KEY-­‐ACQ-­‐1-­‐55

$5,650 $5,600 1 Acquisition  (COMM)

$11,300 COMM_Key

Clearfield Gulich  Township Mountz  Memorial  Park  Addition

KEY-­‐ACQ-­‐3-­‐78

$5,500 $5,500 3 Acquisition  (COMM)

$11,000 COMM_Key

Clearfield Headwaters  Charitable  Trust  

Brockway  to  Piney  Feasibility  Study

BRC-­‐RTP-­‐8-­‐7

$15,800 $15,000 8 Feasibility  Studies  (RT)

$31,600 RT_Key

Page 204: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  204  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Clearfield Headwaters  Charitable  Trust  

Snow  Shoe  Rail  Trail  Development

KEY-­‐RTD-­‐5-­‐7

$65,000 $65,000 5 Rail  Rehabilitation  and  Development  (RT)

$455,100 RT_Key

Clearfield Headwaters  R.  C.  &  D.  Council  

Clearfield-­‐Grampian  Trail

KEY-­‐RTD-­‐95-­‐16

$19,500 $19,500 1 Rail  Rehabilitation  and  Development  (RT)

$39,000 RT_Key

Clearfield Houtzdale  Line  Rails  to  Trails  

Houtzdale  Line  Rail-­‐Trail

KEY-­‐RTD-­‐3-­‐9

$16,000 $16,000 3 Rail  Rehabilitation  and  Development  (RT)

$32,000 RT_Key

Clearfield Houtzdale  Line  Rails  to  Trails  

Houtzdale  Line  Rails  to  Trails

BRC-­‐RTD-­‐7-­‐7

$14,225 $14,000 7 Rail  Rehabilitation  and  Development  (RT)

$28,451 RT_Key

Clearfield Houtzdale  Line  Rails  to  Trails  

Trail  Surfacing  and  Drainage

BRC-­‐RTD-­‐8-­‐8

$4,600 $5,000 8 Rail  Rehabilitation  and  Development  (RT)

$10,000 RT_Key

Clearfield Irvona  Borough Elderberry  Park BRC-­‐SC-­‐11-­‐128

$26,700 $26,700 11 Small  Communities/Small  Projects  (COMM)

$33,400 COMM_Key

Page 205: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  205  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Clearfield Irvona  Borough Elderberry  Park KEY-­‐SC-­‐5-­‐95 $14,000 $14,000 5 Small  Communities/Small  Projects  (COMM)

$15,000 COMM_Key

Clearfield Irvona  Borough Elderberry  Park  Expansion

BRC-­‐ACQ-­‐17-­‐223

$29,825 $25,000 17 Acquisition  (COMM)

$59,650 COMM_Key

Clearfield Karthaus  Township Karthaus  Park  -­‐  Development

BRC-­‐SC-­‐17-­‐41

$38,494 $38,500 17 Small  Communities/Small  Projects  (COMM)

$56,988 COMM_Key

Clearfield Karthaus  Township Karthaus  Park  Master  Site  Plan

BRC-­‐TAG-­‐13-­‐188

$8,000 $8,000 13 Master  Site  Plans  (COMM)

$16,000 COMM_Key

Clearfield Lawrence  Township Lawrence  Township  Recreation  Park  -­‐  Phase  4

BRC-­‐PRD-­‐12-­‐167

$21,000 $21,000 12 Park  Rehabilitation  and  Development  (COMM)

$42,000 COMM_Key

Clearfield Lawrence  Township Recreation  Park BRC-­‐PRD-­‐10-­‐122

$18,173 $18,000 10 Park  Rehabilitation  and  Development  (COMM)

$36,346 COMM_Key

Clearfield Lawrence  Township Recreational  Park  -­‐  Phase  II

BRC-­‐PRD-­‐9-­‐111

$19,700 $19,700 9 Park  Rehabilitation  and  Development  (COMM)

$39,400 COMM_Key

Page 206: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  206  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Clearfield Lawrence  Township Recreational  Park  -­‐Development

BRC-­‐PRD-­‐17-­‐130

$8,100 $8,100 17 Park  Rehabilitation  and  Development  (COMM)

$16,200 COMM_Key

Clearfield Lawrence  Township Recreational  Park-­‐Phase  I

KEY-­‐PRD-­‐2-­‐77

$114,000 $114,000 2 Park  Rehabilitation  and  Development  (COMM)

$229,000 COMM_Key

Clearfield Lawrence  Township Township  Park KEY-­‐ACQ-­‐3-­‐109

$20,400 $20,400 3 Acquisition  (COMM)

$40,800 COMM_Key

Clearfield Mahaffey  Borough Scout  Community  Park

BRC-­‐SC-­‐12-­‐107

$20,000 $20,000 12 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Clearfield Mahaffey  Borough Scout  Park BRC-­‐SC-­‐7-­‐114

$20,000 $20,000 7 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Clearfield Morris  Township Recreation  Area  Phase  II

KEY-­‐SC-­‐2-­‐108

$20,000 $20,000 2 Small  Communities/Small  Projects  (COMM)

$27,150 COMM_Key

Clearfield Osceola  Mills  Borough

Clear  Centre  Swimming  Pool

KEY-­‐PRD-­‐4-­‐120

$192,400 $71,800 4 Park  Rehabilitation  and  Development  (COMM)

$384,800 COMM_Key

Page 207: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  207  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Clearfield Ramey  Borough Palcher  Park BRC-­‐SC-­‐6-­‐156

$11,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$12,500 COMM_Key

Clearfield Ramey  Borough Palcher  Park BRC-­‐SC-­‐9-­‐173

$20,000 $21,000 9 Small  Communities/Small  Projects  (COMM)

$21,700 COMM_Key

Clearfield Sandy  Township Recreation  Park  Improvements

BRC-­‐PRD-­‐11-­‐77

$53,700 $53,700 11 Park  Rehabilitation  and  Development  (COMM)

$107,400 COMM_Key

Clearfield Troutville  Borough Troutville  Park BRC-­‐SC-­‐9-­‐211

$28,000 $28,000 9 Small  Communities/Small  Projects  (COMM)

$36,000 COMM_Key

Clearfield Westover  Borough Mosser  Park BRC-­‐SC-­‐13-­‐328

$24,800 $24,800 13 Small  Communities/Small  Projects  (COMM)

$31,000 COMM_Key

Clearfield Westover  Borough Mosser  Park  -­‐  Phase  2

BRC-­‐SC-­‐12-­‐128

$26,000 $26,000 12 Small  Communities/Small  Projects  (COMM)

$32,000 COMM_Key

Clearfield Westover  Borough Mosser  Park  -­‐  Phase  I

BRC-­‐SC-­‐8-­‐216

$25,200 $25,000 8 Small  Communities/Small  Projects  (COMM)

$30,400 COMM_Key

Page 208: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  208  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Clearfield Westover  Borough Mosser  Recreation  Park  -­‐  Development

BRC-­‐SC-­‐17-­‐52

$30,000 $30,000 17 Small  Communities/Small  Projects  (COMM)

$40,000 COMM_Key

Clearfield Westover  Borough Westover  Park  Master  Plan

KEY-­‐TAG-­‐5-­‐226

$15,000 $15,000 5 Master  Site  Plans  (COMM)

$30,000 COMM_Key

Clearfield,  Jefferson

Western  Pennsylvania  Conservancy  

Redbank  Creek  Watershed  Conservation  Plan

BRC-­‐RCP-­‐10-­‐13

$174,900 $170,000 10 Planning  (RIV) $356,700 RIVER_Key

Clinton Castanea  Township Harvey's  Run  Park BRC-­‐SC-­‐8-­‐35

$23,000 $23,000 8 Small  Communities/Small  Projects  (COMM)

$25,000 COMM_Key

Clinton Castanea  Township Lower  Creek  Road  Park  -­‐  Phase  I

BRC-­‐SC-­‐10-­‐68

$40,000 $40,000 10 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Clinton Chapman  Township North  Bend  Boat  Launch

BRC-­‐RCD-­‐16-­‐175

$63,028 $55,400 16 Development  (RIV)

$118,484 COMM_Key

Clinton Clinton  County Clinton  Co.  Greenway  &  Open  Space  Plan

BRC-­‐TAG-­‐13.3-­‐464

$130,000 $130,000 13.3 Greenway  Plans  (COMM)

$260,000 COMM_Key

Clinton Clinton  County Peer-­‐To-­‐Peer  Project BRC-­‐TAG-­‐7-­‐38

$7,500 $7,500 7 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$8,250 COMM_Key

Page 209: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  209  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Clinton Flemington  Borough Grove  Community  Park  -­‐  Development

BRC-­‐PRD-­‐17-­‐119

$88,669 $88,600 17 Park  Rehabilitation  and  Development  (COMM)

$177,337 COMM_Key

Clinton Flemington  Borough Grove  Community  Park  Master  Site  Plan

BRC-­‐TAG-­‐14-­‐206

$13,000 $13,000 14 Master  Site  Plans  (COMM)

$26,000 COMM_Key

Clinton Flemington  Borough Grove  Park KEY-­‐SC-­‐4-­‐59 $8,367 $8,400 4 Small  Communities/Small  Projects  (COMM)

$9,867 COMM_Key

Clinton Lock  Haven  Area  Flood  Protection  Authority  

River  Walk KEY-­‐PRD-­‐4-­‐84

$60,500 $60,500 4 Park  Rehabilitation  and  Development  (COMM)

$121,000 COMM_Key

Clinton Lock  Haven  City Comprehensive  Recreation  &  Park  Plan

KEY-­‐TAG-­‐1-­‐73

$12,000 $12,000 1 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$25,000 COMM_Key

Clinton Lock  Haven  City Piper  Harmon  Playground

BRC-­‐PRD-­‐13-­‐117

$63,900 $63,900 13 Park  Rehabilitation  and  Development  (COMM)

$127,800 COMM_Key

Clinton Northcentral  Pennsylvania  Conservancy  

New  Garden  Property

KEY-­‐LTA-­‐4-­‐13

$350,000 $325,000 4 Open  Space  Acquisition  (LT)

$850,000 LT_Key

Page 210: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  210  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Clinton Wayne  Township Wayne  Township  Nature  Park

BRC-­‐PRD-­‐15-­‐72

$156,700 $63,000 15 Park  Rehabilitation  and  Development  (COMM)

$313,500 COMM_Key

Clinton Western  Clinton  County  Recreation  Authority  

WCCRA  Rec.  Center  Feasibility  Study

BRC-­‐TAG-­‐14-­‐250

$12,787 $12,700 14 Feasibility  Studies  (COMM)

$25,575 COMM_Key

Clinton Western Pennsylvania Conservancy

Patricia Knarr Tract Acquisition

BRC-LTA-19-30

$450,000.00 $450,000.00 19 Open Space Acquisition (LT)

$900,000.00 LT_Key

Clinton Western Pennsylvania Conservancy

Patricia Knarr Tract Acquisition

BRC-LTA-19-30

$450,000.00 $450,000.00 19 Open Space Acquisition (LT)

$900,000.00 LT_Key

Clinton Western Pennsylvania Conservancy

Patricia Knarr Tract Acquisition

BRC-LTA-19-30

$450,000.00 $450,000.00 19 Open Space Acquisition (LT)

$900,000.00 LT_Key

Clinton Western  Pennsylvania  Conservancy  

Tamarack  Swamp KEY-­‐LTA-­‐4-­‐23

$82,500 $82,500 4 Critical  Habitat  Acquisition  (LT)

$165,000 LT_Key

Clinton Woodward  Township

Boat  Launch BRC-­‐PRD-­‐13.3-­‐451

$114,800 $114,800 13.3 Park  Rehabilitation  and  Development  (COMM)

$247,300 COMM_Key

Clinton Woodward  Township

River  Park KEY-­‐PRD-­‐3-­‐243

$100,000 $100,000 3 Park  Rehabilitation  and  Development  (COMM)

$200,000 COMM_Key

Page 211: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  211  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Clinton Woodward  Township

Riverview  Park-­‐  Development

BRC-­‐SC-­‐18-­‐44

$40,000 $40,000 18 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Columbia Benton  Borough Benton  Park-­‐  Development

BRC-­‐PRD-­‐16-­‐120

$82,000 $82,000 16 Park  Rehabilitation  and  Development  (COMM)

$164,000 COMM_Key

Columbia Benton  Borough Borough  Park  Master  Plan

BRC-­‐TAG-­‐12-­‐224

$10,000 $10,000 12 Master  Site  Plans  (COMM)

$20,000 COMM_Key

Columbia Berwick  Borough Ber-­‐Vaughn  Park KEY-­‐PRD-­‐2-­‐11

$60,000 $60,000 2 Park  Rehabilitation  and  Development  (COMM)

$120,000 COMM_Key

Columbia Berwick  Borough Berwick  Riverfront  Trail  Project

BRC-­‐PRD-­‐16-­‐121

$100,000 $100,000 16 Park  Rehabilitation  and  Development  (COMM)

$413,550 COMM_Key

Columbia Bloomsburg  Town Bloomsburg  Park BRC-­‐PRD-­‐14-­‐115

$244,400 $244,000 14 Park  Rehabilitation  and  Development  (COMM)

$488,800 COMM_Key

Columbia Bloomsburg  Town Bloomsburg  Park  Master  Site  Plan

BRC-­‐TAG-­‐12-­‐225

$50,900 $40,900 12 Master  Site  Plans  (COMM)

$101,800 COMM_Key

Page 212: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  212  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Columbia Bloomsburg  Town Comp.  Recreation,  Park  &  Open  Space  Plan

KEY-­‐TAG-­‐5-­‐19

$15,400 $15,400 5 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$42,800 COMM_Key

Columbia Bloomsburg  Town Norris  E.  Rock  Memorial  Swimming  Pool

BRC-­‐PRD-­‐9-­‐26

$115,600 $115,000 9 Park  Rehabilitation  and  Development  (COMM)

$231,200 COMM_Key

Columbia Bloomsburg  Town Streater  Park  -­‐  Development

BRC-­‐PRD-­‐18-­‐50

$50,000 $50,000 18 Park  Rehabilitation  and  Development  (COMM)

$100,000 COMM_Key

Columbia Bloomsburg  Town Streater/Ridge/Krause  Property  Acquisition

BRC-­‐ACQ-­‐12-­‐275

$63,800 $63,800 12 Acquisition  (COMM)

$127,600 COMM_Key

Columbia Catawissa  Borough Recreational  Park KEY-­‐PRD-­‐5-­‐32

$19,350 $19,400 5 Park  Rehabilitation  and  Development  (COMM)

$38,700 COMM_Key

Columbia Columbia  County Columbia  Co.  Rec.,  Park  &  Open  Space  Plan

BRC-­‐TAG-­‐8-­‐48

$25,000 $25,000 8 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$50,000 COMM_Key

Columbia Columbia  County Columbia  County  Susquehanna  Trail

BRC-­‐PRD-­‐6-­‐43

$258,000 $200,000 6 Park  Rehabilitation  and  Development  (COMM)

$1,976,600 COMM_Key

Page 213: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  213  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Columbia Columbia  County Peer-­‐to-­‐Peer KEY-­‐TAG-­‐4-­‐1

$7,500 $7,500 4 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$8,250 COMM_Key

Columbia Columbia  County Twin  Bridges  Park  Rehab

BRC-­‐PRD-­‐11-­‐21

$243,900 $166,600 11 Park  Rehabilitation  and  Development  (COMM)

$487,900 COMM_Key

Columbia Columbia  County  Housing  Corporation  

Little  Property  Acquisition

BRC-­‐ACQ-­‐12-­‐72

$31,500 $31,500 12 Acquisition  (COMM)

$63,000 COMM_Key

Columbia Millville  Borough Community  Park BRC-­‐PRD-­‐10-­‐127

$60,000 $60,000 10 Park  Rehabilitation  and  Development  (COMM)

$120,000 COMM_Key

Columbia Millville  Borough Community  Park  -­‐  Phase  I

BRC-­‐SC-­‐8-­‐120

$40,000 $40,000 8 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Columbia,  Luzerne

Pennsylvania  Environmental  Council,  Inc.  

Greater  Wyoming  Valley  Rivers  Conservation  Plan

BRC-­‐RCP-­‐10-­‐8

$35,000 $35,000 10 Planning  (RIV) $70,000 RIVER_Key

Columbia,  Luzerne

SEDA-­‐Council  of  Governments  

Berwick  Community  Connections

BRC-­‐TAG-­‐13-­‐205

$25,000 $25,000 13 Feasibility  Studies  (COMM)

$60,000 COMM_Key

Columbia,  Luzerne,  Schuylkill

Pennsylvania  Environmental  Council,  Inc.  

Catawissa  Watershed  Rivers  Conservation  Plan

BRC-­‐RCP-­‐12-­‐11

$41,000 $41,000 12 Planning  (RIV) $82,000 RIVER_Key

Page 214: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  214  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Columbia,  Montour

SEDA-­‐Council  of  Governments  

Columbia-­‐Montour  North  Branch  Canal  Trail

BRC-­‐RTP-­‐10-­‐10

$61,465 $62,000 10 Feasibility  Studies  (RT)

$122,930 RT_Key

Columbia,  Montour

SEDA-­‐Council  of  Governments  

North  Branch  Canal  Land  Survey

BRC-­‐TAG-­‐14-­‐373

$37,500 $26,200 14 Education  and  Training  (COMM)

$75,000 COMM_Key

Columbia,  Northumberland

The  Conservation  Fund  

Brush  Valley BRC-­‐LTA-­‐9-­‐1

$2,350,000 $2,192,000 9 Critical  Habitat  Acquisition  (LT)

$4,700,000 LT_Key

Crawford Bloomfield  Township

Playground BRC-­‐SC-­‐9-­‐25

$22,000 $22,000 9 Small  Communities/Small  Projects  (COMM)

$24,000 COMM_Key

Crawford Cambridge  Springs  Borough

Community  Park  Master  Plan

KEY-­‐TAG-­‐5-­‐30

$8,125 $8,100 5 Master  Site  Plans  (COMM)

$16,250 COMM_Key

Crawford Clear  Lake  Authority   East  Branch  Trail  -­‐  Phase  1

BRC-­‐RTD-­‐12-­‐6

$200,000 $210,000 12 Rail  Rehabilitation  and  Development  (RT)

$1,335,000 RT_Key

Crawford Cochranton  Borough Little  Sugar  Creek  Pedestrian  Bridge  (SRS)

BRC-­‐PRD-­‐11.5-­‐18

$14,000 $14,000 11.5 Park  Rehabilitation  and  Development  (COMM)

$72,600 COMM_Key

Crawford Conneaut Lake Borough

Fireman's Beach - Development

BRC-PRD-19-73

$400,000.00 $400,000.00 19 Park Rehabilitation and Development (COMM)

$800,000.00 COMM_Key

Page 215: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  215  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Crawford Conneaut Lake Borough

Fireman's Beach - Development

BRC-PRD-19-73

$400,000.00 $400,000.00 19 Park Rehabilitation and Development (COMM)

$800,000.00 COMM_Key

Crawford Conneaut Lake Borough

Fireman's Beach - Development

BRC-PRD-19-73

$400,000.00 $400,000.00 19 Park Rehabilitation and Development (COMM)

$800,000.00 COMM_Key

Crawford Conneaut  Valley  Economic  &  Industrial  Development  Authority  

Canal  Park KEY-­‐PRD-­‐1-­‐34

$62,027 $62,000 1 Park  Rehabilitation  and  Development  (COMM)

$124,054 COMM_Key

Crawford Conneaut  Valley  Economic  &  Industrial  Development  Authority  

Trail  Feasibility  Study BRC-­‐TAG-­‐8-­‐53

$5,000 $5,000 8 Feasibility  Studies  (COMM)

$10,152 COMM_Key

Crawford Conneautville  Borough

Lord  Mason  Park KEY-­‐SC-­‐4-­‐37 $18,714 $18,000 4 Small  Communities/Small  Projects  (COMM)

$18,714 COMM_Key

Crawford Conneautville  Borough

Lord-­‐Mason  Memorial  Park

KEY-­‐PRD-­‐2-­‐32

$39,450 $39,400 2 Park  Rehabilitation  and  Development  (COMM)

$78,900 COMM_Key

Page 216: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  216  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Crawford Crawford  County Colonel  Crawford  Park

KEY-­‐PRD-­‐2-­‐34

$30,000 $30,000 2 Park  Rehabilitation  and  Development  (COMM)

$60,000 COMM_Key

Crawford Crawford  County Colonel  Crawford  Park  Peer-­‐to-­‐Peer  Study

BRC-­‐TAG-­‐16-­‐242

$9,000 $10,000 16 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$10,000 COMM_Key

Crawford Crawford  County Woodcock  Creek  Lake  Multi-­‐Use  Trail  Phase  II

KEY-­‐PRD-­‐4-­‐39

$26,700 $26,700 4 Park  Rehabilitation  and  Development  (COMM)

$53,400 COMM_Key

Crawford Crawford County Woodcock Lake Park - Development

BRC-PRD-19-74

$35,230.00 $35,200.00 19 Park Rehabilitation and Development (COMM)

$70,281.00 COMM_Key

Crawford Crawford County Woodcock Lake Park - Development

BRC-PRD-19-74

$35,230.00 $35,200.00 19 Park Rehabilitation and Development (COMM)

$70,281.00 COMM_Key

Crawford Crawford County Woodcock Lake Park - Development

BRC-PRD-19-74

$35,230.00 $35,200.00 19 Park Rehabilitation and Development (COMM)

$70,281.00 COMM_Key

Page 217: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  217  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Crawford Envision  Linesville,  Inc.  

Seabee  Trail BRC-­‐RTD-­‐12-­‐9

$60,000 $60,000 12 Rail  Rehabilitation  and  Development  (RT)

$305,000 RT_Key

Crawford Envision  Linesville,  Inc.  

Spillway-­‐to-­‐Townline  Road  Trail  Study

BRC-­‐RTP-­‐14-­‐278

$17,500 $17,500 14 Feasibility  Studies  (RT)

$35,000 RT_Key

Crawford French  Creek  COG   French  Creek  Greenway

BRC-­‐TAG-­‐8-­‐73

$10,100 $15,300 8 Greenway  Plans  (COMM)

$20,100 COMM_Key

Crawford French  Creek  Recreational  Trails,  Inc.  

Ernst  Bike  Trail BRC-­‐RTD-­‐14-­‐365

$200,000 $132,000 14 Rail  Rehabilitation  and  Development  (RT)

$276,000 RT_Key

Crawford Greenwood  Township

Greenwood  Township  Park

BRC-­‐SC-­‐8-­‐80

$24,900 $24,000 8 Small  Communities/Small  Projects  (COMM)

$30,600 COMM_Key

Crawford Hayfield  Township Meade  Road  Park KEY-­‐SC-­‐3-­‐85 $20,000 $20,000 3 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Crawford Hydetown  Borough Hasbrouck  Park  Complex

KEY-­‐SC-­‐4-­‐69 $20,000 $20,000 4 Small  Communities/Small  Projects  (COMM)

$28,642 COMM_Key

Crawford Meadville  Area  Recreation  Authority  

Meadville  Area  Rec.  Complex  Master  Site  Plan

BRC-­‐TAG-­‐14-­‐220

$15,000 $15,000 14 Master  Site  Plans  (COMM)

$30,000 COMM_Key

Page 218: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  218  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Crawford Meadville  Area  Recreation  Authority  

Meadville  Area  Recreation  Complex

BRC-­‐PRD-­‐6-­‐110

$150,000 $70,000 6 Park  Rehabilitation  and  Development  (COMM)

$314,000 COMM_Key

Crawford Meadville  Area  Recreation  Authority  

Meadville  Area  Recreation  Complex  -­‐  Roof  Renovation

BRC-­‐PRD-­‐12-­‐171

$55,000 $55,000 12 Park  Rehabilitation  and  Development  (COMM)

$110,000 COMM_Key

Crawford Meadville  Area  Recreation  Authority  

Recreation  Center BRC-­‐PRD-­‐13.3-­‐393

$75,000 $75,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$150,000 COMM_Key

Crawford Meadville  Area  Recreation  Authority  

Recreation  Complex KEY-­‐PRD-­‐4-­‐99

$59,750 $59,700 4 Park  Rehabilitation  and  Development  (COMM)

$119,500 COMM_Key

Crawford Meadville  Area  Recreation  Authority  

Tennis  Courts BRC-­‐PRD-­‐9-­‐131

$70,000 $70,000 9 Park  Rehabilitation  and  Development  (COMM)

$140,000 COMM_Key

Crawford Meadville  City French  Creek  /  Mill  Run  Greenways

KEY-­‐PRD-­‐5-­‐127

$45,000 $45,000 5 Park  Rehabilitation  and  Development  (COMM)

$90,000 COMM_Key

Page 219: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  219  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Crawford Meadville  City Huidekoper  Park KEY-­‐PRD-­‐2-­‐96

$21,980 $21,900 2 Park  Rehabilitation  and  Development  (COMM)

$43,960 COMM_Key

Crawford Meadville City Multi-municipal Comp. Rec. Park, Open Space & Master Site Plan

BRC-TAG-19-138

$33,500.00 $33,500.00 19 Comp. Rec., Park, & Open Space Plans (COMM)

$67,000.00 COMM_Key

Crawford Meadville City Multi-municipal Comp. Rec. Park, Open Space & Master Site Plan

BRC-TAG-19-138

$33,500.00 $33,500.00 19 Comp. Rec., Park, & Open Space Plans (COMM)

$67,000.00 COMM_Key

Crawford Meadville City Multi-municipal Comp. Rec. Park, Open Space & Master Site Plan

BRC-TAG-19-138

$33,500.00 $33,500.00 19 Comp. Rec., Park, & Open Space Plans (COMM)

$67,000.00 COMM_Key

Crawford Meadville  City Peer-­‐to-­‐Peer KEY-­‐TAG-­‐4-­‐181

$7,500 $7,500 4 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$8,250 COMM_Key

Crawford North  Shenango  Township

Community  Center  Park

KEY-­‐SC-­‐3-­‐156

$20,000 $20,000 3 Small  Communities/Small  Projects  (COMM)

$21,000 COMM_Key

Crawford Richmond  Township Baseball  Field  Renovation

BRC-­‐SC-­‐12-­‐117

$16,600 $20,000 12 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Crawford Saegertown  Borough Erie  Street  Baseball/Softball  Field

BRC-­‐SC-­‐12-­‐120

$40,000 $40,000 12 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Page 220: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  220  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Crawford Spartansburg  Borough

Clear  Lake  Park BRC-­‐SC-­‐7-­‐179

$33,250 $28,000 7 Small  Communities/Small  Projects  (COMM)

$51,550 COMM_Key

Crawford Spartansburg  Borough

East  Branch  Trail  -­‐  Remediation

BRC-­‐PRD-­‐10-­‐97

$20,500 $4,603 10 Park  Rehabilitation  and  Development  (COMM)

$40,000 COMM_Key

Crawford Springboro  Borough Borough  Park BRC-­‐SC-­‐6-­‐173

$20,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$35,000 COMM_Key

Crawford Summit  Township Gibson  Park KEY-­‐SC-­‐5-­‐195

$20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$30,544 COMM_Key

Crawford Summit  Township Gibson  Park  Master  Site  Plan

BRC-­‐TAG-­‐16-­‐73

$12,500 $12,500 16 Master  Site  Plans  (COMM)

$25,000 COMM_Key

Crawford Titusville  City Burgess  Park  Rehabilitation

BRC-­‐PRD-­‐12-­‐205

$150,000 $150,000 12 Park  Rehabilitation  and  Development  (COMM)

$341,300 COMM_Key

Crawford Titusville  City Comprehensive  Recreation,  Open  Space  &  Greenway  Plan

BRC-­‐TAG-­‐15-­‐104

$24,000 $24,000 15 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$48,000 COMM_Key

Page 221: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  221  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Crawford Titusville  City Dick  Kraffert  Pool BRC-­‐PRD-­‐13-­‐149

$200,000 $200,000 13 Park  Rehabilitation  and  Development  (COMM)

$418,000 COMM_Key

Crawford Titusville  City Ed  Myer  Complex  &  Roberts  Grove

KEY-­‐PRD-­‐3-­‐219

$495,200 $400,000 3 Park  Rehabilitation  and  Development  (COMM)

$1,000,000 COMM_Key

Crawford Titusville  City Mini-­‐Recreation  Plan KEY-­‐TAG-­‐1-­‐135

$5,000 $5,000 1 Master  Site  Plans  (COMM)

$10,000 COMM_Key

Crawford Union  Township Ernst  Bike  Trail KEY-­‐RTD-­‐5-­‐18

$30,000 $80,000 5 Rail  Rehabilitation  and  Development  (RT)

$355,866 RT_Key

Crawford Union  Township Ernst  Bike  Trail  Study KEY-­‐RTP-­‐4-­‐21

$7,500 $7,500 4 Master  Plans  (RT)

$15,000 RT_Key

Crawford Vernon  Township Roche  Park BRC-­‐PRD-­‐9-­‐217

$66,000 $66,000 9 Park  Rehabilitation  and  Development  (COMM)

$132,000 COMM_Key

Crawford Western  Pennsylvania  Conservancy  

Smock  Fee  Acquisition  -­‐  Cussewago  Creek

BRC-­‐LTA-­‐18-­‐22

$315,792 $313,000 18 Open  Space  Acquisition  (LT)

$631,583 LT_Key

Crawford,  Erie,  Mercer,  Venango

Western  Pennsylvania  Conservancy  

French  Creek  Watershed  Aquatic  Biodiversity

BRC-­‐RCI-­‐11-­‐17

$120,700 $120,000 11 Implementation  (RIV)

$322,500 RIVER_Key

Page 222: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  222  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Crawford,  Erie,  Warren

Western  Pennsylvania  Conservancy  

Brokenstraw  Creek  Watershed  Plan

BRC-­‐RCP-­‐13-­‐14

$67,800 $67,800 13 Planning  (RIV) $135,600 RIVER_Key

Cumberland Alliance  for  the  Chesapeake  Bay,  Inc.  

Cedar  Run  Watershed  Plan

BRC-­‐RCP-­‐13-­‐4

$79,400 $50,000 13 Planning  (RIV) $158,900 RIVER_Key

Cumberland Appalachian  Trail  Conservancy  

White  Rocks  Acquisition

BRC-­‐LTA-­‐16-­‐19

$1,600,000 $1,600,000 16 Open  Space  Acquisition  (LT)

$3,200,400 LT_Key

Cumberland Big  Spring  Watershed  Association  

Big  Spring  Creek  Watershed  Conservation  Plan

BRC-­‐RCP-­‐9-­‐3

$13,000 $13,000 9 Planning  (RIV) $26,000 RIVER_Key

Cumberland Carlisle  Borough Royer  Linear  Park  aka  Forbes  Path

BRC-­‐PRD-­‐13.3-­‐346

$189,000 $189,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$378,000 COMM_Key

Cumberland Carlisle  Borough West  End  Trail  Connection

BRC-­‐PRD-­‐17-­‐220

$206,596 $200,000 17 Park  Rehabilitation  and  Development  (COMM)

$413,192 COMM_Key

Cumberland Central  Pennsylvania  Conservancy  

Fogarty  Acquisition  -­‐  Waggoner's  Gap

BRC-­‐LTA-­‐13.3-­‐513

$207,800 $190,000 13.3 Open  Space  Acquisition  (LT)

$415,600 LT_Key

Cumberland Central  Pennsylvania  Conservancy  

Millers  Gap BRC-­‐LTA-­‐6-­‐5

$99,000 $80,000 6 Open  Space  Acquisition  (LT)

$198,000 LT_Key

Page 223: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  223  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Cumberland Central  Pennsylvania  Conservancy  

Seven  Gables  Tract KEY-­‐LTA-­‐3-­‐5 $475,000 $275,000 3 Open  Space  Acquisition  (LT)

$900,000 LT_Key

Cumberland Cumberland  County Comprehensive  Recreation,  Open  Space  &  Greenway  Plan  Update

BRC-­‐TAG-­‐16-­‐56

$20,000 $20,000 16 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$41,600 COMM_Key

Cumberland Cumberland  County Cumberland  County  Aquifer  Recharge  Preservation  Plan

BRC-­‐RCP-­‐13.3-­‐508

$99,500 $16,700 13.3 Planning  (RIV) $199,000 RIVER_Key

Cumberland Cumberland  County Cumberland  County  Aquifer  Recharge  Preservation  Plan

BRC-­‐RCP-­‐13.3-­‐508

$99,500 $82,800 13.3 Planning  (RIV) $199,000 COMM_Key

Cumberland Cumberland  County Greenway  Plan KEY-­‐TAG-­‐3-­‐45

$22,500 $22,500 3 Greenway  Plans  (COMM)

$45,000 COMM_Key

Cumberland Cumberland  County Natural  Areas  Inventory

KEY-­‐TAG-­‐2-­‐35

$64,834 $64,800 2 Natural  Areas  Inventories  (COMM)

$129,668 COMM_Key

Cumberland Cumberland  County Open  Space  Preservation  Plan

BRC-­‐TAG-­‐7-­‐45

$93,571 $93,000 7 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$187,142 COMM_Key

Cumberland Cumberland  County  Redevelopment  Authority  

Walnut  Street  Feasibility  Study  -­‐  Phase  II

BRC-­‐TAG-­‐14-­‐236

$35,000 $35,000 14 Feasibility  Studies  (COMM)

$70,000 COMM_Key

Cumberland Cumberland  Valley  Chapter  of  Trout  Unlimited,  Inc.  

LeTort  Property  Acquisition

BRC-­‐RCA-­‐12-­‐2

$51,150 $48,700 12 Acquisition  (RIV)

$102,300 RIVER_Key

Page 224: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  224  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Cumberland Cumberland  Valley  Rails-­‐to-­‐Trails  Council,  Inc.  

Cumberland  Valley  Rail  Trail-­‐Shippensburg  Connector-­‐Development

BRC-­‐PRT-­‐17-­‐78

$1,328,500 $100,000 17 Development  and  Rehabilitation

$1,463,500 RT_Key

Cumberland Cumberland  Valley  Rails-­‐to-­‐Trails  Council,  Inc.  

Cumberland  Valley  Trail

BRC-­‐RTD-­‐8-­‐5

$140,700 $291,400 8 Rail  Rehabilitation  and  Development  (RT)

$694,900 RT_Key

Cumberland Cumberland  Valley  Rails-­‐to-­‐Trails  Council,  Inc.  

Cumberland  Valley  Trail

BRC-­‐RTD-­‐8-­‐5

$140,700 $30,000 8 Rail  Rehabilitation  and  Development  (RT)

$694,900 RT_Key

Cumberland Cumberland  Valley  Rails-­‐to-­‐Trails  Council,  Inc.  

Master  Development  Plan

KEY-­‐RTP-­‐95-­‐10

$22,600 $22,600 1 Master  Plans  (RT)

$45,200 RT_Key

Cumberland Dickinson  Township Barnitz  Mill KEY-­‐ACQ-­‐5-­‐47

$44,000 $42,500 5 Acquisition  (COMM)

$88,000 COMM_Key

Cumberland East  Pennsboro  Township

Adams-­‐Ricci  Community  Park

BRC-­‐TAG-­‐7-­‐60

$11,265 $11,000 7 Master  Site  Plans  (COMM)

$21,530 COMM_Key

Cumberland East  Pennsboro  Township

Adams-­‐Ricci  Park-­‐Phase  III

KEY-­‐PRD-­‐2-­‐41

$96,000 $96,000 2 Park  Rehabilitation  and  Development  (COMM)

$200,000 COMM_Key

Cumberland Hampden  Township Creekview  North  Access

KEY-­‐ACQ-­‐5-­‐79

$22,321 $15,000 5 Acquisition  (COMM)

$44,625 COMM_Key

Page 225: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  225  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Cumberland Hampden  Township Hampden  Park KEY-­‐PRD-­‐3-­‐80

$25,000 $25,000 3 Park  Rehabilitation  and  Development  (COMM)

$52,600 COMM_Key

Cumberland Hopewell  Township Martin  Property  Acquisition

BRC-­‐ACQ-­‐9-­‐95

$50,200 $40,000 9 Acquisition  (COMM)

$100,500 COMM_Key

Cumberland Lemoyne  Borough Community  Swimming  Pool

BRC-­‐PRD-­‐14-­‐149

$542,200 $300,000 14 Park  Rehabilitation  and  Development  (COMM)

$1,084,400 COMM_Key

Cumberland Letort  Regional  Authority  

LeTort  Nature  Trail:  Phase  1  Implementation

BRC-­‐PRT-­‐15-­‐11

$235,343 $43,000 15 Development  and  Rehabilitation

$470,686 COMM_Key

Cumberland Lower  Allen  Township

Cedar  Spring  Run  Park  -­‐  Phase  1  -­‐  Development

BRC-­‐PRD-­‐17-­‐133

$201,705 $201,700 17 Park  Rehabilitation  and  Development  (COMM)

$403,410 COMM_Key

Cumberland Lower  Allen  Township

Cedar  Spring  Run  Park  -­‐  Phase  2  -­‐  Development

BRC-­‐PRD-­‐18-­‐83

$127,668 $127,500 18 Park  Rehabilitation  and  Development  (COMM)

$255,336 COMM_Key

Cumberland Lower  Allen  Township

Community  Park  Development

BRC-­‐PRD-­‐12-­‐168

$260,000 $200,000 12 Park  Rehabilitation  and  Development  (COMM)

$520,000 COMM_Key

Page 226: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  226  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Cumberland Lower  Allen  Township

Linsenbach  Parkland  Acquisition

BRC-­‐ACQ-­‐12-­‐73

$176,200 $176,000 12 Acquisition  (COMM)

$352,300 COMM_Key

Cumberland Lower  Allen  Township

MSC  Park  Master  Site  Plan

BRC-­‐TAG-­‐14-­‐215

$15,000 $15,000 14 Master  Site  Plans  (COMM)

$30,000 COMM_Key

Cumberland Lower  Allen  Township

Seven  Sites KEY-­‐PRD-­‐2-­‐85

$85,600 $85,600 2 Park  Rehabilitation  and  Development  (COMM)

$171,200 COMM_Key

Cumberland Lower  Allen  Township

Two  Sites KEY-­‐PRD-­‐4-­‐87

$94,000 $94,000 4 Park  Rehabilitation  and  Development  (COMM)

$188,000 COMM_Key

Cumberland Lower  Allen  Township

Yellow  Breeches  Watershed  Conservation  Plan

BRC-­‐RCP-­‐8-­‐16

$124,400 $120,000 8 Planning  (RIV) $248,800 RIVER_Key

Cumberland Lower  Frankford  Township

Opossum  Lake  Recreation  Area

BRC-­‐SC-­‐14-­‐95

$40,000 $40,000 14 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Cumberland Mechanicsburg  Borough

Mechanicsburg  Area  Community  Swimming  Pool-­‐Development

BRC-­‐PRD-­‐15-­‐59

$124,511 $124,000 15 Park  Rehabilitation  and  Development  (COMM)

$249,022 COMM_Key

Cumberland Mechanicsburg  Borough

Memorial  Park KEY-­‐PRD-­‐1-­‐82

$47,900 $47,900 1 Park  Rehabilitation  and  Development  (COMM)

$95,800 COMM_Key

Page 227: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  227  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Cumberland Mechanicsburg  Borough

Soldier's  &  Sailor's  Memorial  Park

BRC-­‐PRD-­‐7-­‐125

$88,900 $80,000 7 Park  Rehabilitation  and  Development  (COMM)

$180,600 COMM_Key

Cumberland Mechanicsburg Borough

Soldiers and Sailors Memorial Park- Development

BRC-PRD-19-95

$151,548.00 $150,000.00 19 Park Rehabilitation and Development (COMM)

$303,096.00 COMM_Key

Cumberland Mechanicsburg Borough

Soldiers and Sailors Memorial Park- Development

BRC-PRD-19-95

$151,548.00 $150,000.00 19 Park Rehabilitation and Development (COMM)

$303,096.00 COMM_Key

Cumberland Mechanicsburg Borough

Soldiers and Sailors Memorial Park- Development

BRC-PRD-19-95

$151,548.00 $150,000.00 19 Park Rehabilitation and Development (COMM)

$303,096.00 COMM_Key

Cumberland Middlesex  Township Beagle  Club  Road  Park

KEY-­‐PRD-­‐1-­‐84

$120,000 $100,000 1 Park  Rehabilitation  and  Development  (COMM)

$320,000 COMM_Key

Cumberland Middlesex  Township Middlesex  Township  Park  Rehabilitation

BRC-­‐PRD-­‐13-­‐122

$59,000 $59,000 13 Park  Rehabilitation  and  Development  (COMM)

$118,000 COMM_Key

Cumberland Monroe Township Minnich Land Acquisition

BRC-ACQ-19-12

$50,375.00 $50,300.00 19 Acquisition (COMM)

$100,750.00 COMM_Key

Cumberland Monroe Township Minnich Land Acquisition

BRC-ACQ-19-12

$50,375.00 $50,300.00 19 Acquisition (COMM)

$100,750.00 COMM_Key

Page 228: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  228  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Cumberland Monroe Township Minnich Land Acquisition

BRC-ACQ-19-12

$50,375.00 $50,300.00 19 Acquisition (COMM)

$100,750.00 COMM_Key

Cumberland New  Cumberland  Borough

Borough  Park BRC-­‐PRD-­‐6-­‐123

$87,000 $87,000 6 Park  Rehabilitation  and  Development  (COMM)

$174,000 COMM_Key

Cumberland Newville  Borough Community  Park KEY-­‐SC-­‐1-­‐96 $20,000 $20,000 1 Small  Communities/Small  Projects  (COMM)

$25,000 COMM_Key

Cumberland Newville  Borough Newville  Community  Park

BRC-­‐SC-­‐6-­‐126

$20,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$28,843 COMM_Key

Cumberland North  Newton  Township

Township  Park BRC-­‐PRD-­‐13-­‐131

$78,400 $78,000 13 Park  Rehabilitation  and  Development  (COMM)

$156,800 COMM_Key

Cumberland Penn  Township Township  Park  Development

BRC-­‐SC-­‐12-­‐114

$40,000 $40,000 12 Small  Communities/Small  Projects  (COMM)

$73,700 COMM_Key

Cumberland Shippensburg  Borough

Pool  Feasibility  Study KEY-­‐TAG-­‐1-­‐127

$3,750 $3,700 1 Feasibility  Studies  (COMM)

$7,500 COMM_Key

Cumberland Shippensburg  Regional  Recreation  &  Park  Commission  

Comp.  Rec,  Park  &  Open  Space  Plan/Master  Site  Plan

BRC-­‐TAG-­‐8-­‐173

$25,000 $25,000 8 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$50,000 COMM_Key

Page 229: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  229  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Cumberland Shippensburg  Township

Britton  Road  Park BRC-­‐PRD-­‐6-­‐167

$150,000 $150,000 6 Park  Rehabilitation  and  Development  (COMM)

$300,000 COMM_Key

Cumberland Shiremanstown  Borough

Memorial  Park BRC-­‐SC-­‐9-­‐186

$35,000 $25,000 9 Small  Communities/Small  Projects  (COMM)

$50,000 COMM_Key

Cumberland Shiremanstown  Borough

Memorial  Park-­‐  Development

BRC-­‐SC-­‐18-­‐41

$28,000 $28,000 18 Small  Communities/Small  Projects  (COMM)

$36,000 COMM_Key

Cumberland Shiremanstown  Borough

Two  Sites KEY-­‐SC-­‐4-­‐139

$20,000 $20,000 4 Small  Communities/Small  Projects  (COMM)

$39,700 COMM_Key

Cumberland Silver  Spring  Township

Comp.  Rec.,  Park  and  Open  Space  Plan  Update

BRC-­‐TAG-­‐8-­‐175

$15,000 $15,000 8 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$30,000 COMM_Key

Cumberland Silver  Spring  Township

Comprehensive  Recreation,  Open  Space  &  Greenway  Plan

BRC-­‐TAG-­‐16-­‐72

$27,015 $27,000 16 Greenway  Plans  (COMM)

$54,030 COMM_Key

Cumberland Silver Spring Township Paul Walters Memorial Park- Development

BRC-PRD-19-115

$350,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)

$800,000.00 COMM_Key

Page 230: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  230  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Cumberland Silver Spring Township Paul Walters Memorial Park- Development

BRC-PRD-19-115

$350,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)

$800,000.00 COMM_Key

Cumberland Silver Spring Township Paul Walters Memorial Park- Development

BRC-PRD-19-115

$350,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)

$800,000.00 COMM_Key

Cumberland Silver Spring Township Potteiger Park- Development

BRC-PRD-19-116

$54,780.00 $50,000.00 19 Park Rehabilitation and Development (COMM)

$110,045.00 COMM_Key

Cumberland Silver Spring Township Potteiger Park- Development

BRC-PRD-19-116

$54,780.00 $50,000.00 19 Park Rehabilitation and Development (COMM)

$110,045.00 COMM_Key

Cumberland Silver Spring Township Potteiger Park- Development

BRC-PRD-19-116

$54,780.00 $50,000.00 19 Park Rehabilitation and Development (COMM)

$110,045.00 COMM_Key

Cumberland Silver  Spring  Township

Stony  Ridge  Park-­‐Phase  I

BRC-­‐PRD-­‐8-­‐176

$175,000 $150,000 8 Park  Rehabilitation  and  Development  (COMM)

$370,000 COMM_Key

Cumberland Silver  Spring  Township

Willow  Mill  Park  Master  Plan

KEY-­‐TAG-­‐4-­‐140

$15,000 $15,000 4 Master  Site  Plans  (COMM)

$30,000 COMM_Key

Cumberland South  Middleton  Township

Leaman  Farm  Acquisition

BRC-­‐ACQ-­‐12-­‐74

$178,700 $150,000 12 Acquisition  (COMM)

$357,400 COMM_Key

Page 231: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  231  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Cumberland South  Middleton  Township

Spring  Meadows KEY-­‐ACQ-­‐2-­‐143

$176,950 $150,000 2 Acquisition  (COMM)

$354,500 COMM_Key

Cumberland South  Middleton  Township

Spring  Meadows KEY-­‐ACQ-­‐3-­‐198

$143,500 $140,000 3 Acquisition  (COMM)

$287,000 COMM_Key

Cumberland South  Middleton  Township

Spring  Meadows  Park  Master  Site  Plan

BRC-­‐TAG-­‐18-­‐149

$16,100 $16,000 18 Master  Site  Plans  (COMM)

$32,200 COMM_Key

Cumberland South  Middleton  Township

Two  Sites KEY-­‐PRD-­‐5-­‐187

$207,000 $150,000 5 Park  Rehabilitation  and  Development  (COMM)

$471,000 COMM_Key

Cumberland Southampton  Township

Goshorn  Property BRC-­‐ACQ-­‐7-­‐177

$132,300 $130,000 7 Acquisition  (COMM)

$264,600 COMM_Key

Cumberland Southampton  Township

Peer  Study BRC-­‐TAG-­‐6-­‐5

$7,500 $7,500 6 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$8,250 COMM_Key

Cumberland The  Nature  Conservancy  

Sutton  Property  Acquisition

BRC-­‐LTA-­‐13-­‐23

$212,100 $212,000 13 Open  Space  Acquisition  (LT)

$424,200 LT_Key

Cumberland Upper  Allen  Township

Beamer  Property  Acquisition

BRC-­‐ACQ-­‐11.5-­‐41

$250,000 $100,000 11.5 Acquisition  (COMM)

$638,000 COMM_Key

Cumberland Upper  Allen  Township

Friendship  Park BRC-­‐PRD-­‐6-­‐182

$162,200 $162,200 6 Park  Rehabilitation  and  Development  (COMM)

$324,400 COMM_Key

Page 232: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  232  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Cumberland Upper  Allen  Township

Simpson  Park  -­‐  Phase  2  Development

BRC-­‐PRD-­‐12-­‐210

$150,000 $150,000 12 Park  Rehabilitation  and  Development  (COMM)

$357,613 COMM_Key

Cumberland Upper  Allen  Township

Simpson  Track  Park-­‐Phase  I

BRC-­‐PRD-­‐8-­‐197

$100,000 $100,000 8 Park  Rehabilitation  and  Development  (COMM)

$231,000 COMM_Key

Cumberland Upper  Allen  Township

Winding  Hills  Park  Phase  1  West  -­‐    Development

BRC-­‐PRD-­‐17-­‐157

$125,000 $125,000 17 Park  Rehabilitation  and  Development  (COMM)

$250,000 COMM_Key

Cumberland West  Pennsboro  Township

Bethany  Church  Land  Acquisition

BRC-­‐ACQ-­‐11.5-­‐15

$25,200 $25,000 11.5 Acquisition  (COMM)

$85,000 COMM_Key

Cumberland West  Pennsboro  Township

Township  Park BRC-­‐PRD-­‐13-­‐155

$151,400 $100,000 13 Park  Rehabilitation  and  Development  (COMM)

$302,800 COMM_Key

Cumberland Wormleysburg  Borough

North  Second  Street  Park

BRC-­‐SC-­‐9-­‐234

$40,000 $40,000 9 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Cumberland,  Franklin

Shippensburg  Area  Recreation  &  Park  Commission  

Circuit  Rider  Director  of  Recreation  &  Parks

BRC-­‐TAG-­‐7-­‐174

$36,000 $78,250 7 Circuit  Rider  (COMM)

$72,000 COMM_Key

Page 233: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  233  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Cumberland,  Franklin

The  Nature  Conservancy  

Vernal    Pool  Inventory,  Conserv.  &  Mgmt.

BRC-­‐LTP-­‐11-­‐5

$29,300 $29,000 11 Critical  Habitat  Planning  (LT)

$58,600 LT_Key

Dauphin Central  Pennsylvania  Conservancy  

Powell's  &  Armstrong  Creeks  Watershed  Plan

BRC-­‐RCP-­‐10-­‐1

$45,015 $45,000 10 Planning  (RIV) $106,095 RIVER_Key

Dauphin Central  Pennsylvania  Conservancy  

Schreckengaust  Conservation  Area  Acquisition

BRC-­‐LTA-­‐8-­‐4

$74,500 $74,000 8 Critical  Habitat  Acquisition  (LT)

$149,000 LT_Key

Dauphin Conewago  Township Conewago  Township  Park  -­‐  Phase  2  -­‐  Development

BRC-­‐PRD-­‐18-­‐59

$206,081 $200,000 18 Park  Rehabilitation  and  Development  (COMM)

$412,162 COMM_Key

Dauphin Conewago  Township Hershey  School/Trust  Land  Acquisition

BRC-­‐ACQ-­‐14-­‐51

$435,200 $300,000 14 Acquisition  (COMM)

$870,500 COMM_Key

Dauphin Dauphin County Capital Area Greenbelt – Safety Improvements – Development

BRC-PRD-19-75

$500,000.00 $500,000.00 19 Park Rehabilitation and Development (COMM)

$1,283,000.00 COMM_Key

Dauphin Dauphin County Capital Area Greenbelt – Safety Improvements – Development

BRC-PRD-19-75

$500,000.00 $500,000.00 19 Park Rehabilitation and Development (COMM)

$1,283,000.00 COMM_Key

Dauphin Dauphin County Capital Area Greenbelt – Safety Improvements – Development

BRC-PRD-19-75

$500,000.00 $500,000.00 19 Park Rehabilitation and Development (COMM)

$1,283,000.00 COMM_Key

Page 234: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  234  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Dauphin Dauphin County Capital Area Greenbelt – Safety Improvements – Development

BRC-PRD-19-75

$500,000.00 $500,000.00 19 Park Rehabilitation and Development (COMM)

$1,283,000.00 COMM_Key

Dauphin Dauphin County Capital Area Greenbelt – Safety Improvements – Development

BRC-PRD-19-75

$500,000.00 $500,000.00 19 Park Rehabilitation and Development (COMM)

$1,283,000.00 COMM_Key

Dauphin Dauphin County Capital Area Greenbelt – Safety Improvements – Development

BRC-PRD-19-75

$500,000.00 $500,000.00 19 Park Rehabilitation and Development (COMM)

$1,283,000.00 COMM_Key

Dauphin Dauphin  County Capital  Area  Greenbelt  Planning  Study

BRC-­‐TAG-­‐17-­‐222

$60,000 $60,000 17 Trail  Study  (COMM)

$120,000 COMM_Key

Dauphin Dauphin  County Everhart  Covered  Bridge  -­‐  Ft.  Hunter  Park

BRC-­‐PRD-­‐11-­‐23

$125,000 $100,000 11 Park  Rehabilitation  and  Development  (COMM)

$250,000 COMM_Key

Dauphin Dauphin  County Fort  Hunter  Park-­‐Final  Development  Phase

BRC-­‐PRD-­‐8-­‐55

$90,000 $80,000 8 Park  Rehabilitation  and  Development  (COMM)

$180,000 COMM_Key

Dauphin Dauphin  County Lykens  Valley  Rail/Trail  Feasibility  Study

BRC-­‐RTP-­‐7-­‐2

$15,000 $15,000 7 Feasibility  Studies  (RT)

$30,000 RT_Key

Dauphin Dauphin  County Parks,  Open  Space  and  Greenway  Plan

BRC-­‐TAG-­‐11.5-­‐21

$37,500 $35,000 11.5 Greenway  Plans  (COMM)

$75,000 COMM_Key

Page 235: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  235  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Dauphin Dauphin  County Wildwood  Nature  Center

KEY-­‐PRD-­‐2-­‐36

$500,000 $250,000 2 Park  Rehabilitation  and  Development  (COMM)

$1,761,100 COMM_Key

Dauphin Dauphin County Wildwood Park Trail and Lake Improvements – Development

BRC-PRD-19-205

$32,176.00 $32,000.00 19 Park Rehabilitation and Development (COMM)

$128,704.00 COMM_Key

Dauphin Dauphin County Wildwood Park Trail and Lake Improvements – Development

BRC-PRD-19-205

$32,176.00 $32,000.00 19 Park Rehabilitation and Development (COMM)

$128,704.00 COMM_Key

Dauphin Dauphin County Wildwood Park Trail and Lake Improvements – Development

BRC-PRD-19-205

$32,176.00 $32,000.00 19 Park Rehabilitation and Development (COMM)

$128,704.00 COMM_Key

Dauphin Dauphin County Wildwood Park Trail and Lake Improvements – Development

BRC-PRD-19-205

$32,176.00 $32,000.00 19 Park Rehabilitation and Development (COMM)

$128,704.00 COMM_Key

Dauphin Derry  Township Bicycle  Path BRC-­‐PRD-­‐12-­‐289

$109,200 $109,200 12 Park  Rehabilitation  and  Development  (COMM)

$218,400 COMM_Key

Page 236: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  236  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Dauphin Derry  Township Bicycle  Path KEY-­‐PRD-­‐5-­‐46

$200,000 $150,000 5 Park  Rehabilitation  and  Development  (COMM)

$3,254,000 COMM_Key

Dauphin Halifax  Area  Recreation  Authority  

Community  Park KEY-­‐PRD-­‐2-­‐57

$88,900 $88,900 2 Park  Rehabilitation  and  Development  (COMM)

$177,900 COMM_Key

Dauphin Halifax  Borough Riverfront  Park BRC-­‐RCD-­‐8-­‐15

$40,000 $25,000 8 Development  (RIV)

$60,000 RIVER_Key

Dauphin Halifax  Township Fort  Halifax  Park BRC-­‐TAG-­‐13-­‐184

$34,600 $34,500 13 Master  Site  Plans  (COMM)

$69,100 COMM_Key

Dauphin Harrisburg  City Capital  Area  Greenbelt

BRC-­‐PRD-­‐8-­‐81

$303,000 $300,000 8 Park  Rehabilitation  and  Development  (COMM)

$1,141,900 COMM_Key

Dauphin Harrisburg  City Commerce  Bank  Park

BRC-­‐PRD-­‐14-­‐144

$500,000 $500,000 14 Park  Rehabilitation  and  Development  (COMM)

$1,390,400 COMM_Key

Dauphin Harrisburg  City Riverfront  Park KEY-­‐PRD-­‐5-­‐82

$250,000 $150,000 5 Park  Rehabilitation  and  Development  (COMM)

$500,000 COMM_Key

Page 237: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  237  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Dauphin Harrisburg  City Shipoke,  Wilson  Park,  and  Norwood  Playgr

KEY-­‐PRD-­‐3-­‐82

$101,500 $101,500 3 Park  Rehabilitation  and  Development  (COMM)

$216,500 COMM_Key

Dauphin Highspire  Borough Charles  Street  Park  and  Memorial  Park

BRC-­‐SC-­‐9-­‐93

$40,000 $40,000 9 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Dauphin Highspire  Borough Reservoir  Park-­‐Development

BRC-­‐PRD-­‐16-­‐174

$312,500 $312,000 16 Park  Rehabilitation  and  Development  (COMM)

$625,000 COMM_Key

Dauphin Highspire  Borough Three  Sites KEY-­‐SC-­‐5-­‐87 $19,974 $20,000 5 Small  Communities/Small  Projects  (COMM)

$19,974 COMM_Key

Dauphin Hummelstown  Borough

Hummel  Nature  Trail BRC-­‐SC-­‐9-­‐98

$40,000 $40,000 9 Small  Communities/Small  Projects  (COMM)

$73,000 COMM_Key

Dauphin Hummelstown  Borough

Hummelstown  Neighborhood  Park

KEY-­‐PRD-­‐5-­‐90

$81,919 $82,000 5 Park  Rehabilitation  and  Development  (COMM)

$163,838 COMM_Key

Dauphin Hummelstown  Borough

Hummelstown  United  Water  Company  Trail

BRC-­‐SC-­‐6-­‐85

$18,000 $18,000 6 Small  Communities/Small  Projects  (COMM)

$18,000 COMM_Key

Page 238: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  238  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Dauphin Hummelstown  Borough

Mehaffie  Park KEY-­‐SC-­‐4-­‐68 $19,000 $19,000 4 Small  Communities/Small  Projects  (COMM)

$19,000 COMM_Key

Dauphin Londonderry  Township

Braeburn  Park BRC-­‐SC-­‐7-­‐104

$27,240 $27,000 7 Small  Communities/Small  Projects  (COMM)

$55,517 COMM_Key

Dauphin Londonderry  Township

Sunset  Park KEY-­‐PRD-­‐4-­‐85

$30,000 $30,000 4 Park  Rehabilitation  and  Development  (COMM)

$78,125 COMM_Key

Dauphin Lower Paxton Township

Friendship Center Phase 3 and Brightbill Park - Development

BRC-PRD-19-94

$250,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)

$506,100.00 COMM_Key

Dauphin Lower Paxton Township

Friendship Center Phase 3 and Brightbill Park - Development

BRC-PRD-19-94

$250,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)

$506,100.00 COMM_Key

Dauphin Lower Paxton Township

Friendship Center Phase 3 and Brightbill Park - Development

BRC-PRD-19-94

$250,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)

$506,100.00 COMM_Key

Dauphin Lower  Paxton  Township

Friendship  Center-­‐  Phase  2-­‐  Development

BRC-­‐PRD-­‐16-­‐145

$115,031 $115,000 16 Park  Rehabilitation  and  Development  (COMM)

$230,062 COMM_Key

Page 239: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  239  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Dauphin Lower  Paxton  Township

Greenway  Study BRC-­‐TAG-­‐11-­‐221

$25,000 $25,000 11 Greenway  Plans  (COMM)

$50,000 COMM_Key

Dauphin Lower  Paxton  Township

Thomas  B.  George  Park

BRC-­‐PRD-­‐10-­‐123

$106,100 $105,000 10 Park  Rehabilitation  and  Development  (COMM)

$212,210 COMM_Key

Dauphin Lower  Paxton  Township

Wolfersberger  and  Koons  Park  Master  Site  Plans

BRC-­‐TAG-­‐16-­‐63

$40,000 $40,000 16 Master  Site  Plans  (COMM)

$80,000 COMM_Key

Dauphin Lower  Swatara  Township

Memorial  Park KEY-­‐PRD-­‐4-­‐89

$30,000 $30,000 4 Park  Rehabilitation  and  Development  (COMM)

$60,000 COMM_Key

Dauphin Lower  Swatara  Township

Messick  Tract  Acquisition

BRC-­‐ACQ-­‐11-­‐179

$109,000 $109,000 11 Acquisition  (COMM)

$218,000 COMM_Key

Dauphin Lykens  Borough West  Borough  Park BRC-­‐SC-­‐6-­‐101

$19,738 $19,700 6 Small  Communities/Small  Projects  (COMM)

$19,738 COMM_Key

Dauphin Middletown  Borough

Middletown  Swimming  Pool  Rehab.

KEY-­‐PRD-­‐3-­‐136

$80,000 $80,000 3 Park  Rehabilitation  and  Development  (COMM)

$160,000 COMM_Key

Dauphin Middletown  Borough

Pool  Feasibility  Study KEY-­‐TAG-­‐3-­‐135

$10,000 $10,000 3 Feasibility  Studies  (COMM)

$20,000 COMM_Key

Page 240: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  240  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Dauphin Millersburg  Borough Comp.  Open  Space  Plan/Master  Plans

BRC-­‐TAG-­‐10-­‐159

$25,000 $25,000 10 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$50,000 COMM_Key

Dauphin Millersburg  Borough Lykens  Valley  Rail  Trail-­‐Ned  Smith  Section  -­‐  Development

BRC-­‐PRD-­‐18-­‐177

$394,000 $107,800 18 Park  Rehabilitation  and  Development  (COMM)

$492,500 COMM_Key

Dauphin Millersburg  Borough Riverfront  Park-­‐Development

BRC-­‐PRD-­‐15-­‐61

$386,350 $280,000 15 Park  Rehabilitation  and  Development  (COMM)

$772,700 COMM_Key

Dauphin Millersburg  Borough Susquehanna  Riverbank  Stabilization  (Millersburg)

KEY-­‐RCD-­‐5-­‐11

$12,000 $12,000 5 Development  (RIV)

$24,000 RIVER_Key

Dauphin Paxton  Creek  Watershed  and  Education  Association  

Paxton  Creek  Watershed  Conservation  Plan

BRC-­‐RCP-­‐8-­‐27

$19,000 $19,000 8 Planning  (RIV) $38,000 COMM_Key

Dauphin Royalton  Borough Kiwanis  Park KEY-­‐SC-­‐1-­‐117

$20,000 $20,000 1 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Dauphin South  Hanover  Township

Peer  to  Peer BRC-­‐TAG-­‐10-­‐15

$7,500 $7,500 10 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$8,250 COMM_Key

Page 241: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  241  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Dauphin South  Hanover  Township

The  Meadows  Park-­‐Phase  I  (aka)  Hanshue  Park

BRC-­‐PRD-­‐8-­‐179

$201,700 $175,000 8 Park  Rehabilitation  and  Development  (COMM)

$402,500 COMM_Key

Dauphin Steelton  Borough Susquehanna  River  Boat  Launch  -­‐  Phase  I

BRC-­‐PRD-­‐10-­‐138

$150,000 $100,000 10 Park  Rehabilitation  and  Development  (COMM)

$300,000 COMM_Key

Dauphin Steelton  Borough Susquehanna  River  Boat  Launch  -­‐  Phase  II

BRC-­‐PRD-­‐11-­‐87

$150,000 $150,000 11 Park  Rehabilitation  and  Development  (COMM)

$300,000 COMM_Key

Dauphin Steelton  Borough Three  Borough  Parks  Improvements

BRC-­‐PRD-­‐7-­‐183

$172,000 $150,000 7 Park  Rehabilitation  and  Development  (COMM)

$363,100 COMM_Key

Dauphin Susquehanna  Township

Capital  Area  Greenbelt

KEY-­‐ACQ-­‐5-­‐198

$80,500 $80,500 5 Acquisition  (COMM)

$161,000 COMM_Key

Dauphin Susquehanna  Township

Capital  Area  Greenbelt

KEY-­‐PRD-­‐5-­‐197

$462,403 $142,000 5 Park  Rehabilitation  and  Development  (COMM)

$924,806 COMM_Key

Page 242: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  242  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Dauphin Susquehanna  Township

Crown  Point  Park BRC-­‐PRD-­‐11-­‐88

$152,900 $100,000 11 Park  Rehabilitation  and  Development  (COMM)

$305,800 COMM_Key

Dauphin Susquehanna  Township

Three  Sites KEY-­‐PRD-­‐3-­‐214

$190,200 $186,000 3 Park  Rehabilitation  and  Development  (COMM)

$380,400 COMM_Key

Dauphin Swatara  Township Comp.  Recreation,  Park  &  Open  Space  Plan

BRC-­‐TAG-­‐10-­‐172

$20,000 $20,000 10 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$40,000 COMM_Key

Dauphin Swatara  Township Pedestrian  Greenway  Access  Study

BRC-­‐TAG-­‐13.3-­‐497

$32,400 $30,000 13.3 Greenway  Plans  (COMM)

$64,800 COMM_Key

Dauphin Swatara  Township Schiavoni  Tract  Acquisition

BRC-­‐ACQ-­‐15-­‐49

$50,000 $50,000 15 Acquisition  (COMM)

$100,000 COMM_Key

Dauphin Swatara  Township Swatara  Crest  Park KEY-­‐ACQ-­‐3-­‐215

$18,000 $18,000 3 Acquisition  (COMM)

$36,000 COMM_Key

Dauphin Swatara  Township Swatara  Crest  Park KEY-­‐PRD-­‐5-­‐199

$44,358 $44,400 5 Park  Rehabilitation  and  Development  (COMM)

$88,715 COMM_Key

Dauphin The  Conservation  Fund  

Swatara  Creek  Greenway

KEY-­‐LTA-­‐5-­‐2 $21,400 $20,000 5 Open  Space  Acquisition  (LT)

$42,800 LT_Key

Page 243: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  243  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Dauphin Tri-­‐County  Regional  Planning  Commission  

Susquehanna  River  Conservation  Play

KEY-­‐RCP-­‐95-­‐20

$10,000 $10,000 1 Planning  (RIV) $20,000 RIVER_Key

Dauphin Washington  Township

Loyalton  Park BRC-­‐SC-­‐9-­‐222

$40,000 $40,000 9 Small  Communities/Small  Projects  (COMM)

$63,700 COMM_Key

Dauphin West  Hanover  Township

Comp.  Recreation,  Park  &  Open  Space  Plan

KEY-­‐TAG-­‐4-­‐170

$15,853 $15,800 4 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$31,705 COMM_Key

Dauphin West  Hanover  Township

Lenker  Park BRC-­‐PRD-­‐9-­‐228

$58,800 $58,000 9 Park  Rehabilitation  and  Development  (COMM)

$117,600 COMM_Key

Dauphin West  Hanover  Township

Skyline  Commons  Park  Development

BRC-­‐PRD-­‐12-­‐216

$166,000 $166,000 12 Park  Rehabilitation  and  Development  (COMM)

$332,000 COMM_Key

Dauphin Wiconisco  Township L  &  W  Memorial  Field

KEY-­‐PRD-­‐4-­‐175

$30,000 $30,000 4 Park  Rehabilitation  and  Development  (COMM)

$60,000 COMM_Key

Dauphin Wiconisco  Township Lykens  Valley  Rail  Trail-­‐  Phase  I

BRC-­‐PRD-­‐14-­‐186

$116,557 $120,800 14 Park  Rehabilitation  and  Development  (COMM)

$233,115 COMM_Key

Page 244: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  244  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Dauphin Williamstown  Borough

Williamstown  Community  Park  Master  Site  Plan

BRC-­‐TAG-­‐12-­‐266

$7,500 $10,000 12 Master  Site  Plans  (COMM)

$20,000 COMM_Key

Dauphin Williamstown Borough Williamstown Park- Development

BRC-SC-19-55

$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)

$60,000.00 COMM_Key

Dauphin Williamstown Borough Williamstown Park- Development

BRC-SC-19-55

$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)

$60,000.00 COMM_Key

Dauphin Williamstown Borough Williamstown Park- Development

BRC-SC-19-55

$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)

$60,000.00 COMM_Key

Dauphin,  Lebanon

Swatara  Creek  Watershed  Association,  Inc.  

Swatara  Water  Trail  Signs

BRC-­‐RCD-­‐7-­‐19

$4,885 $4,800 7 Development  (RIV)

$13,770 RIVER_Key

Delaware Aldan  Borough Borough  Park KEY-­‐SC-­‐3-­‐6 $20,000 $2,000 3 Small  Communities/Small  Projects  (COMM)

$29,000 COMM_Key

Delaware Aston  Township Comp.  Rec.,  Pks.  &  Open  Space  Plan

BRC-­‐TAG-­‐8-­‐18

$36,500 $36,000 8 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$73,100 COMM_Key

Delaware Aston  Township Eagle  Field KEY-­‐PRD-­‐1-­‐6

$42,500 $42,500 1 Park  Rehabilitation  and  Development  (COMM)

$85,000 COMM_Key

Page 245: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  245  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Delaware Brookhaven  Borough

Bike/Walk  Path  &  Passive  Recreation  Park

BRC-­‐PRD-­‐6-­‐24

$35,000 $35,000 6 Park  Rehabilitation  and  Development  (COMM)

$70,000 COMM_Key

Delaware Chester  City Barry  Bridge  Park  Expansion

BRC-­‐PRD-­‐8-­‐38

$275,000 $200,000 8 Park  Rehabilitation  and  Development  (COMM)

$1,581,300 COMM_Key

Delaware Chester  City Chester  Park  Improvements

BRC-­‐PRD-­‐11-­‐18

$163,000 $163,000 11 Park  Rehabilitation  and  Development  (COMM)

$326,000 COMM_Key

Delaware Chester  Heights  Borough

Community  Park-­‐Phase  I

KEY-­‐PRD-­‐2-­‐27

$31,150 $25,000 2 Park  Rehabilitation  and  Development  (COMM)

$62,300 COMM_Key

Delaware Chester  Redevelopment  Authority  

Riverwalk  Plaza BRC-­‐PRD-­‐14-­‐126

$1,000,000 $1,000,000 14 Park  Rehabilitation  and  Development  (COMM)

$6,391,600 COMM_Key

Delaware Chester-­‐Ridley-­‐Crum  Watersheds  Association  

Feasibility  Study KEY-­‐RTP-­‐3-­‐3 $22,500 $22,500 3 Feasibility  Studies  (RT)

$45,000 RT_Key

Page 246: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  246  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Delaware Collingdale  Borough Collingdale  Community  Center

KEY-­‐PRD-­‐3-­‐38

$35,000 $35,000 3 Park  Rehabilitation  and  Development  (COMM)

$70,000 COMM_Key

Delaware Colwyn  Borough John  S.  Bosacco  Park KEY-­‐SC-­‐1-­‐32 $19,700 $19,700 1 Small  Communities/Small  Projects  (COMM)

$19,700 COMM_Key

Delaware Colwyn  Borough Water  Street  Park KEY-­‐SC-­‐3-­‐39 $19,700 $19,700 3 Small  Communities/Small  Projects  (COMM)

$19,700 COMM_Key

Delaware Colwyn  Borough Water  Street  Park-­‐Rehabilitation

BRC-­‐SC-­‐15-­‐75

$20,000 $20,000 15 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Delaware Concord Township Comprehensive Recreation, Open Space and Greenways Plan

BRC-TAG-19-130

$30,000.00 $30,000.00 19 Comp. Rec., Park, & Open Space Plans (COMM)

$60,000.00 COMM_Key

Delaware Concord Township Comprehensive Recreation, Open Space and Greenways Plan

BRC-TAG-19-130

$30,000.00 $30,000.00 19 Comp. Rec., Park, & Open Space Plans (COMM)

$60,000.00 COMM_Key

Delaware Concord Township Comprehensive Recreation, Open Space and Greenways Plan

BRC-TAG-19-130

$30,000.00 $30,000.00 19 Comp. Rec., Park, & Open Space Plans (COMM)

$60,000.00 COMM_Key

Page 247: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  247  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Delaware Darby  Township Brookwood  Park BRC-­‐PRD-­‐5-­‐43

$20,000 $20,000 5 Park  Rehabilitation  and  Development  (COMM)

$40,000 COMM_Key

Delaware Delaware  County Chester  Creek  Branch  Rail-­‐Trail  -­‐  Phase  1  Development

BRC-­‐RTD-­‐12-­‐8

$372,300 $300,000 12 Rail  Rehabilitation  and  Development  (RT)

$3,235,800 RT_Key

Delaware Delaware  County Delaware  County  Recreation,  Open  Space  &  Greenway  Plan  -­‐  Phase  2

BRC-­‐TAG-­‐16-­‐58

$100,000 $100,000 16 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$200,000 COMM_Key

Delaware Delaware  County Delaware  River  Watershed  Conservation  Plan

BRC-­‐RCP-­‐14-­‐285

$45,000 $45,000 14 Planning  (RIV) $90,000 COMM_Key

Delaware Delaware  County East  Coast  Greenway  Study

BRC-­‐TAG-­‐12-­‐234

$50,000 $50,000 12 Greenway  Plans  (COMM)

$127,000 COMM_Key

Delaware Delaware  County Greenway  Plan  for  Darby  Creek  Watershed

BRC-­‐TAG-­‐11-­‐202

$77,500 $75,000 11 Greenway  Plans  (COMM)

$155,000 COMM_Key

Delaware Delaware  County Mineral  Hill  Area  Park  Master  Site  Plan

BRC-­‐TAG-­‐17-­‐6

$25,000 $25,000 17 Master  Site  Plans  (COMM)

$50,000 COMM_Key

Delaware Eddystone  Borough Rehab.  Of  Dorothy  Taylor  Gotthardt  Playground

BRC-­‐SC-­‐8-­‐61

$39,700 $39,000 8 Small  Communities/Small  Projects  (COMM)

$59,300 COMM_Key

Page 248: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  248  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Delaware Edgemont  Township Open  Space  and  Recreation  Plan

KEY-­‐TAG-­‐4-­‐51

$15,000 $15,000 4 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$30,000 COMM_Key

Delaware Edgemont Township Township Park-Development

BRC-PRD-19-206

$272,422.15 $220,000.00 19 Park Rehabilitation and Development (COMM)

$544,844.30 COMM_Key

Delaware Edgemont Township Township Park-Development

BRC-PRD-19-206

$272,422.15 $220,000.00 19 Park Rehabilitation and Development (COMM)

$544,844.30 COMM_Key

Delaware Edgemont Township Township Park-Development

BRC-PRD-19-206

$272,422.15 $220,000.00 19 Park Rehabilitation and Development (COMM)

$544,844.30 COMM_Key

Delaware Folcroft  Borough Borough  Parks  and  Community  Center

KEY-­‐PRD-­‐3-­‐65

$122,700 $100,000 3 Park  Rehabilitation  and  Development  (COMM)

$245,400 COMM_Key

Delaware Glenolden  Borough Glenolden  Community  Park

KEY-­‐PRD-­‐3-­‐74

$40,000 $40,000 3 Park  Rehabilitation  and  Development  (COMM)

$80,000 COMM_Key

Delaware Haverford  Township Conservation  and  Development  Plan

BRC-­‐TAG-­‐6-­‐82

$50,000 $50,000 6 Master  Site  Plans  (COMM)

$100,000 COMM_Key

Delaware Haverford  Township Finelli  Tract BRC-­‐ACQ-­‐9-­‐90

$625,000 $100,000 9 Acquisition  (COMM)

$1,250,000 COMM_Key

Page 249: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  249  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Delaware Haverford  Township Glendale  Road  Tract KEY-­‐ACQ-­‐3-­‐83

$88,800 $88,000 3 Acquisition  (COMM)

$190,000 COMM_Key

Delaware Lansdowne  Borough Ardmore  Avenue  and  Hoffman  Park  Fields

KEY-­‐PRD-­‐4-­‐80

$100,000 $100,000 4 Park  Rehabilitation  and  Development  (COMM)

$200,000 COMM_Key

Delaware Lansdowne  Borough Gateway  Park  and  Trail

BRC-­‐PRD-­‐13-­‐113

$100,000 $100,000 13 Park  Rehabilitation  and  Development  (COMM)

$468,000 COMM_Key

Delaware Lansdowne  Borough Historic  Tree  Park KEY-­‐ACQ-­‐2-­‐76

$66,000 $34,000 2 Acquisition  (COMM)

$132,000 COMM_Key

Delaware Lansdowne Borough Hoffman Park- Development

BRC-PRD-19-89

$185,000.00 $185,000.00 19 Park Rehabilitation and Development (COMM)

$445,000.00 COMM_Key

Delaware Lansdowne Borough Hoffman Park- Development

BRC-PRD-19-89

$185,000.00 $185,000.00 19 Park Rehabilitation and Development (COMM)

$445,000.00 COMM_Key

Delaware Lansdowne Borough Hoffman Park- Development

BRC-PRD-19-89

$185,000.00 $185,000.00 19 Park Rehabilitation and Development (COMM)

$445,000.00 COMM_Key

Delaware Lansdowne  Borough Marlyn  Park  Master  Site  Plan

BRC-­‐TAG-­‐12-­‐243

$125,000 $10,000 12 Master  Site  Plans  (COMM)

$250,000 COMM_Key

Page 250: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  250  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Delaware Lansdowne  Borough Multi-­‐Municipal  Rec  &  Park  Plan

BRC-­‐TAG-­‐10-­‐157

$45,000 $45,000 10 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$90,000 COMM_Key

Delaware Marcus  Hook  Borough

Market  Square  Memorial  Park

BRC-­‐PRD-­‐7-­‐117

$181,551 $100,000 7 Park  Rehabilitation  and  Development  (COMM)

$363,103 COMM_Key

Delaware Marcus  Hook  Borough

Market  Square  Memorial  Park  Marina

BRC-­‐TAG-­‐13-­‐194

$15,000 $15,000 13 Feasibility  Studies  (COMM)

$30,000 COMM_Key

Delaware Marcus  Hook  Borough

Memorial  Field KEY-­‐PRD-­‐3-­‐125

$40,000 $30,000 3 Park  Rehabilitation  and  Development  (COMM)

$80,000 COMM_Key

Delaware Marcus  Hook  Borough

Memorial  Field KEY-­‐SC-­‐4-­‐93 $19,500 $19,500 4 Small  Communities/Small  Projects  (COMM)

$19,500 COMM_Key

Delaware Marcus  Hook  Borough

Memorial  Field KEY-­‐SC-­‐5-­‐123

$20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Delaware Marple  Township Mackey-­‐Green  Bank  Acquisition

BRC-­‐ACQ-­‐7-­‐119

$334,000 $330,000 7 Acquisition  (COMM)

$668,000 COMM_Key

Page 251: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  251  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Delaware Marple  Township Park  Improvements  -­‐  Three  Sites

KEY-­‐PRD-­‐4-­‐96

$50,025 $50,000 4 Park  Rehabilitation  and  Development  (COMM)

$100,050 COMM_Key

Delaware Marple  Township Veterans  Memorial  Park

KEY-­‐PRD-­‐3-­‐126

$26,100 $26,000 3 Park  Rehabilitation  and  Development  (COMM)

$52,300 COMM_Key

Delaware Marple  Township Veterans  Memorial  Park-­‐Phase  II

KEY-­‐PRD-­‐2-­‐94

$92,000 $75,000 2 Park  Rehabilitation  and  Development  (COMM)

$184,000 COMM_Key

Delaware Media  Borough Houtman  Park  -­‐  Development

BRC-­‐PRD-­‐17-­‐137

$201,250 $200,000 17 Park  Rehabilitation  and  Development  (COMM)

$405,550 COMM_Key

Delaware Media  Borough Scott-­‐Lowrie  Playground

KEY-­‐PRD-­‐1-­‐83

$20,778 $20,700 1 Park  Rehabilitation  and  Development  (COMM)

$41,557 COMM_Key

Delaware Middletown  Township

Smedley  Tract  Master  Site  Plan

BRC-­‐TAG-­‐14-­‐221

$25,000 $25,000 14 Master  Site  Plans  (COMM)

$50,000 COMM_Key

Delaware Millbourne  Borough Community  Connector  Greenway  Plan

BRC-­‐TAG-­‐18-­‐158

$13,250 $13,200 18 Trail  Study  (COMM)

$28,180 COMM_Key

Page 252: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  252  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Delaware Morton  Borough Borough  Park KEY-­‐SC-­‐4-­‐107

$19,636 $19,600 4 Small  Communities/Small  Projects  (COMM)

$20,336 COMM_Key

Delaware Natural Lands Trust, Inc.

Darby Creek Greenway Addition

BRC-LTA-19-24

########## ########## 19 Open Space Acquisition (LT)

$2,396,100.00 LT_Key

Delaware Natural Lands Trust, Inc.

Darby Creek Greenway Addition

BRC-LTA-19-24

########## ########## 19 Open Space Acquisition (LT)

$2,396,100.00 LT_Key

Delaware Natural Lands Trust, Inc.

Darby Creek Greenway Addition

BRC-LTA-19-24

########## ########## 19 Open Space Acquisition (LT)

$2,396,100.00 LT_Key

Delaware Natural Lands Trust, Inc.

Darby Creek Greenway Addition

BRC-LTA-19-24

########## ########## 19 Open Space Acquisition (LT)

$2,396,100.00 LT_Key

Delaware Natural Lands Trust, Inc.

Darby Creek Greenway Addition

BRC-LTA-19-24

########## ########## 19 Open Space Acquisition (LT)

$2,396,100.00 LT_Key

Delaware Natural  Lands  Trust,  Inc.  

Elwyn  Acquisition BRC-­‐LTA-­‐13-­‐24

$1,200,000 $500,000 13 Open  Space  Acquisition  (LT)

$5,300,000 LT_Key

Delaware Natural  Lands  Trust,  Inc.  

Hildacy  Preserve  Addition

BRC-­‐LTA-­‐6-­‐16

$533,000 $250,000 6 Critical  Habitat  Acquisition  (LT)

$1,148,000 LT_Key

Delaware Nether  Providence  Township

Duer  and    Houston  Tracts

KEY-­‐ACQ-­‐3-­‐149

$250,000 $275,000 3 Acquisition  (COMM)

$1,000,000 COMM_Key

Delaware Nether  Providence  Township

Hepford  Park KEY-­‐PRD-­‐1-­‐91

$23,783 $23,700 1 Park  Rehabilitation  and  Development  (COMM)

$47,656 COMM_Key

Page 253: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  253  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Delaware Nether Providence Township

Multi-municipal Comprehensive Recreation, Park, Open Space and Greenways Plan

BRC-TAG-19-139

$25,000.00 $25,000.00 19 Comp. Rec., Park, & Open Space Plans (COMM)

$50,000.00 COMM_Key

Delaware Nether Providence Township

Multi-municipal Comprehensive Recreation, Park, Open Space and Greenways Plan

BRC-TAG-19-139

$25,000.00 $25,000.00 19 Comp. Rec., Park, & Open Space Plans (COMM)

$50,000.00 COMM_Key

Delaware Nether Providence Township

Multi-municipal Comprehensive Recreation, Park, Open Space and Greenways Plan

BRC-TAG-19-139

$25,000.00 $25,000.00 19 Comp. Rec., Park, & Open Space Plans (COMM)

$50,000.00 COMM_Key

Delaware Nether Providence Township

Multi-municipal Comprehensive Recreation, Park, Open Space and Greenways Plan

BRC-TAG-19-139

$25,000.00 $25,000.00 19 Comp. Rec., Park, & Open Space Plans (COMM)

$50,000.00 COMM_Key

Delaware Nether Providence Township

Multi-municipal Comprehensive Recreation, Park, Open Space and Greenways Plan

BRC-TAG-19-139

$25,000.00 $25,000.00 19 Comp. Rec., Park, & Open Space Plans (COMM)

$50,000.00 COMM_Key

Delaware Nether Providence Township

Multi-municipal Comprehensive Recreation, Park, Open Space and Greenways Plan

BRC-TAG-19-139

$25,000.00 $25,000.00 19 Comp. Rec., Park, & Open Space Plans (COMM)

$50,000.00 COMM_Key

Delaware Nether Providence Township

Multi-municipal Comprehensive Recreation, Park, Open Space and Greenways Plan

BRC-TAG-19-139

$25,000.00 $25,000.00 19 Comp. Rec., Park, & Open Space Plans (COMM)

$50,000.00 COMM_Key

Page 254: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  254  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Delaware Nether Providence Township

Multi-municipal Comprehensive Recreation, Park, Open Space and Greenways Plan

BRC-TAG-19-139

$25,000.00 $25,000.00 19 Comp. Rec., Park, & Open Space Plans (COMM)

$50,000.00 COMM_Key

Delaware Nether Providence Township

Multi-municipal Comprehensive Recreation, Park, Open Space and Greenways Plan

BRC-TAG-19-139

$25,000.00 $25,000.00 19 Comp. Rec., Park, & Open Space Plans (COMM)

$50,000.00 COMM_Key

Delaware Newtown  Township Trail  System  -­‐  Phase  I KEY-­‐PRD-­‐1-­‐95

$105,172 $100,000 1 Park  Rehabilitation  and  Development  (COMM)

$210,345 COMM_Key

Delaware Parkside  Borough Woodlot  Park-­‐Phase  II-­‐Development

BRC-­‐SC-­‐15-­‐82

$40,000 $35,000 15 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Delaware Pennsylvania  Environmental  Council,  Inc.  

Ridley  Creek  Watershed  Conservation  Plan

KEY-­‐RCP-­‐95-­‐07

$48,000 $48,000 1 Planning  (RIV) $106,000 RIVER_Key

Delaware Radnor Township Darby Creek Headwaters Preserve

BRC-ACQ-19-15

########## ########## 19 Acquisition (COMM)

$10,802,200.00 COMM_Key

Delaware Radnor Township Darby Creek Headwaters Preserve

BRC-ACQ-19-15

########## ########## 19 Acquisition (COMM)

$10,802,200.00 COMM_Key

Delaware Radnor Township Darby Creek Headwaters Preserve

BRC-ACQ-19-15

########## ########## 19 Acquisition (COMM)

$10,802,200.00 COMM_Key

Delaware Radnor  Township Fenimore  Woods  Park

KEY-­‐PRD-­‐1-­‐112

$45,000 $45,000 1 Park  Rehabilitation  and  Development  (COMM)

$90,000 COMM_Key

Page 255: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  255  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Delaware Radnor  Township Greenways  and  Open  Space  Network  Plan

BRC-­‐TAG-­‐17-­‐19

$39,875 $35,000 17 Greenway  Plans  (COMM)

$79,750 COMM_Key

Delaware Ridley  Park  Borough Eastlake  Park  Expansion

KEY-­‐ACQ-­‐3-­‐185

$25,000 $15,000 3 Acquisition  (COMM)

$50,000 COMM_Key

Delaware Ridley  Township Community  Center  Feasibility  Study

BRC-­‐TAG-­‐14-­‐238

$40,000 $40,000 14 Feasibility  Studies  (COMM)

$80,000 COMM_Key

Delaware Ridley  Township Marina  Dock  Renovation  /  Extension

BRC-­‐PRD-­‐11-­‐75

$239,700 $200,000 11 Park  Rehabilitation  and  Development  (COMM)

$479,300 COMM_Key

Delaware Ridley  Township Morrow's  Marina BRC-­‐ACQ-­‐7-­‐164

$500,000 $400,000 7 Acquisition  (COMM)

$1,210,000 COMM_Key

Delaware Ridley  Township Pritchard  Site-­‐Phase  I

KEY-­‐PRD-­‐2-­‐131

$91,450 $90,000 2 Park  Rehabilitation  and  Development  (COMM)

$182,900 COMM_Key

Delaware Rose  Valley  Borough Rhodes  Tract BRC-­‐RCA-­‐8-­‐3

$63,500 $98,000 8 Acquisition  (RIV)

$127,000 RIVER_Key

Delaware Rutledge  Borough Triangle  Park KEY-­‐SC-­‐3-­‐188

$16,800 $16,800 3 Small  Communities/Small  Projects  (COMM)

$20,200 COMM_Key

Delaware Sharon  Hill  Borough Rehabilitation  of  Three  Parks

KEY-­‐PRD-­‐4-­‐138

$25,000 $25,000 4 Park  Rehabilitation  and  Development  (COMM)

$50,000 COMM_Key

Page 256: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  256  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Delaware Springfield  Township Netherwood  Park KEY-­‐PRD-­‐3-­‐205

$25,700 $25,000 3 Park  Rehabilitation  and  Development  (COMM)

$51,400 COMM_Key

Delaware Tinicum  Township Former  Westinghouse  Master  Site  Plan

BRC-­‐TAG-­‐14-­‐247

$50,000 $50,000 14 Master  Site  Plans  (COMM)

$100,000 COMM_Key

Delaware Tinicum  Township Manor  Municipal  Park

KEY-­‐SC-­‐5-­‐202

$20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$28,400 COMM_Key

Delaware Tinicum  Township Westinghouse  Site  Acquisition

BRC-­‐ACQ-­‐9-­‐209

$700,000 $700,000 9 Acquisition  (COMM)

$1,400,000 COMM_Key

Delaware Trainer  Borough Henry  Johnson  Park BRC-­‐SC-­‐6-­‐178

$15,000 $15,000 6 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Delaware Upper  Chichester  Township

Dresner  Tract BRC-­‐ACQ-­‐6-­‐183

$320,000 $160,000 6 Acquisition  (COMM)

$1,000,000 COMM_Key

Delaware Upper  Chichester  Township

Upper  Chichester  Municipal  Recreation    Complex-­‐Development

BRC-­‐PRD-­‐16-­‐162

$214,460 $214,400 16 Park  Rehabilitation  and  Development  (COMM)

$428,920 COMM_Key

Delaware Upper  Darby  Township

Darby  Creek  Stream  Valley  Park  Trail  Feasibility  Study

BRC-­‐TAG-­‐18-­‐162

$10,000 $10,000 18 Trail  Study  (COMM)

$20,000 COMM_Key

Delaware Upper  Providence  Township

Brookwood  -­‐  Lavin  Tract

BRC-­‐ACQ-­‐9-­‐214

$641,000 $300,000 9 Acquisition  (COMM)

$2,332,100 COMM_Key

Page 257: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  257  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Delaware Upper  Providence  Township

Drexeline  Property  Acquisition

BRC-­‐ACQ-­‐13-­‐238

$87,000 $87,000 13 Acquisition  (COMM)

$181,400 COMM_Key

Delaware Yeadon  Borough Community  Park-­‐Phase  II

KEY-­‐PRD-­‐2-­‐181

$60,060 $50,000 2 Park  Rehabilitation  and  Development  (COMM)

$120,720 COMM_Key

Delaware Yeadon  Borough Peer-­‐to-­‐Peer BRC-­‐TAG-­‐10-­‐10

$7,500 $7,500 10 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$8,250 COMM_Key

Delaware,  Philadelphia

Radnor  Township Valley  Forge  to  Heinz  Refuge  Corridor  Feasibility  Study

BRC-­‐TAG-­‐18-­‐160

$70,000 $45,000 18 Trail  Study  (COMM)

$140,000 COMM_Key

Elk Benezette  Township Thunder  Mountain  -­‐  Phase  3  Development

BRC-­‐SC-­‐12-­‐81

$26,000 $26,000 12 Small  Communities/Small  Projects  (COMM)

$32,000 COMM_Key

Elk Benezette  Township Thunder  Mountain  -­‐  Phase  II

BRC-­‐SC-­‐9-­‐19

$27,500 $27,000 9 Small  Communities/Small  Projects  (COMM)

$35,000 COMM_Key

Elk Benezette  Township Thunder  Mountain  Trail  Parking

BRC-­‐SC-­‐8-­‐22

$25,000 $25,000 8 Small  Communities/Small  Projects  (COMM)

$30,000 COMM_Key

Page 258: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  258  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Elk Benzinger  Township  Municipal  Golf  Course  Authority  

Bavarian  Hills  Golf  Course

KEY-­‐PRD-­‐2-­‐10

$81,250 $81,200 2 Park  Rehabilitation  and  Development  (COMM)

$162,500 COMM_Key

Elk Benzinger  Township  Municipal  Golf  Course  Authority  

Parking  Lot BRC-­‐PRD-­‐6-­‐20

$39,650 $39,600 6 Park  Rehabilitation  and  Development  (COMM)

$79,300 COMM_Key

Elk Elk  County Big  Mill  Creek  -­‐  Phase  III

BRC-­‐RCD-­‐14-­‐289

$262,000 $250,000 14 Development  (RIV)

$654,400 COMM_Key

Elk Elk  County Clarion  River  Phase  II  -­‐  Dispersed  Recreation

BRC-­‐RCD-­‐13.3-­‐16

$107,700 $107,700 13.3 Development  (RIV)

$217,900 RIVER_Key

Elk Elk  County Clarion/Little  Toby  Trail

KEY-­‐RTD-­‐5-­‐3

$80,000 $80,000 5 Rail  Rehabilitation  and  Development  (RT)

$808,600 RT_Key

Elk Elk  County Clarion/Little  Toby  Trail  Plan

BRC-­‐RTD-­‐11-­‐16

$20,000 $20,000 11 Feasibility  Studies  (RT)

$40,000 RT_Key

Elk Fox  Township Community  Park BRC-­‐PRD-­‐6-­‐68

$100,000 $100,000 6 Park  Rehabilitation  and  Development  (COMM)

$392,700 COMM_Key

Elk Fox  Township Fox  Twp.  Parks  Master  Site  Plan

BRC-­‐TAG-­‐13.6-­‐594

$15,000 $15,000 13.6 Master  Site  Plans  (COMM)

$30,000 COMM_Key

Page 259: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  259  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Elk Horton  Township Township  Park KEY-­‐SC-­‐4-­‐67 $11,000 $11,000 4 Small  Communities/Small  Projects  (COMM)

$12,000 COMM_Key

Elk Jay  Township Park  Master  Plan BRC-­‐TAG-­‐8-­‐92

$10,000 $10,000 8 Master  Site  Plans  (COMM)

$20,000 COMM_Key

Elk Jay  Township Recreational  Park BRC-­‐SC-­‐10-­‐85

$40,000 $40,000 10 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Elk Johnsonburg  Borough

Community  Park KEY-­‐SC-­‐1-­‐64 $18,130 $18,100 1 Small  Communities/Small  Projects  (COMM)

$20,850 COMM_Key

Elk Johnsonburg  Borough

Community  Park  Phase  II

KEY-­‐SC-­‐2-­‐71 $19,997 $19,900 2 Small  Communities/Small  Projects  (COMM)

$22,019 COMM_Key

Elk Jones  Township Community  Park BRC-­‐SC-­‐11-­‐130

$36,000 $36,000 11 Small  Communities/Small  Projects  (COMM)

$52,900 COMM_Key

Elk Jones  Township Community  Park BRC-­‐SC-­‐14-­‐91

$34,900 $34,900 14 Small  Communities/Small  Projects  (COMM)

$49,700 COMM_Key

Elk Jones  Township Community  Park  -­‐    Development

BRC-­‐SC-­‐17-­‐40

$31,771 $32,000 17 Small  Communities/Small  Projects  (COMM)

$43,542 COMM_Key

Page 260: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  260  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Elk Jones  Township Community  Park  Concession  Building

BRC-­‐SC-­‐9-­‐104

$34,700 $34,000 9 Small  Communities/Small  Projects  (COMM)

$49,500 COMM_Key

Elk Jones  Township Jones  Township  Community  Park

BRC-­‐PRD-­‐8-­‐98

$40,000 $40,000 8 Park  Rehabilitation  and  Development  (COMM)

$82,500 COMM_Key

Elk Ridgway  Borough O.B.  Grant  and  Olson  Parks

BRC-­‐SC-­‐7-­‐163

$40,000 $40,000 7 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Elk Ridgway  Borough Ridgway  Riverfront  Conservation  &  Development  Plan

BRC-­‐TAG-­‐12.5-­‐5

$60,000 $60,000 12.5 Master  Site  Plans  (COMM)

$120,000 COMM_Key

Elk Ridgway  Borough Ridgway  Trailhead KEY-­‐RTD-­‐4-­‐19

$20,000 $20,000 4 Rail  Rehabilitation  and  Development  (RT)

$40,000 RT_Key

Elk Ridgway  Township Sandy  Beach  Park KEY-­‐SC-­‐5-­‐172

$19,877 $19,900 5 Small  Communities/Small  Projects  (COMM)

$55,013 COMM_Key

Elk Spring  Creek  Township

Clarion  River  River  Road  Access  Area-­‐Phase  II

BRC-­‐SC-­‐13.3-­‐264

$20,000 $20,000 13.3 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Page 261: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  261  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Elk St.  Marys  City Benzinger  &  Memorial  Parks

BRC-­‐PRD-­‐7-­‐181

$19,913 $20,000 7 Park  Rehabilitation  and  Development  (COMM)

$39,827 COMM_Key

Elk St.  Marys  City Benzinger  and  Luhr  Parks

BRC-­‐PRD-­‐9-­‐199

$21,500 $21,000 9 Park  Rehabilitation  and  Development  (COMM)

$43,000 COMM_Key

Elk St.  Marys  City Benzinger  Park KEY-­‐PRD-­‐1-­‐131

$35,000 $35,000 1 Park  Rehabilitation  and  Development  (COMM)

$71,690 COMM_Key

Elk St.  Marys  City Impact  St.  Marys BRC-­‐TAG-­‐13-­‐209

$13,200 $13,200 13 Master  Site  Plans  (COMM)

$26,400 COMM_Key

Elk St.  Marys  City Tennis  &  Basketball  Court  Rehab

BRC-­‐PRD-­‐11-­‐86

$41,000 $41,000 11 Park  Rehabilitation  and  Development  (COMM)

$82,100 COMM_Key

Elk Tri  County  Rails  To  Trails  Association  

Clarion-­‐Little  Toby  Rail  Trail

BRC-­‐RTD-­‐12-­‐14

$75,000 $75,000 12 Rail  Rehabilitation  and  Development  (RT)

$150,000 RT_Key

Elk Western  Pennsylvania  Conservancy  

Rowe  Tract  Acquisition  (Bennett  Branch  Access)

BRC-­‐LTA-­‐18-­‐21

$41,000 $41,000 18 Open  Space  Acquisition  (LT)

$133,150 LT_Key

Page 262: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  262  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Elk Western  Pennsylvania  Conservancy  

Winslow  Hill BRC-­‐LTA-­‐6-­‐23

$116,000 $25,000 6 Critical  Habitat  Acquisition  (LT)

$231,000 LT_Key

Elk,  Forest,  Jefferson

Lumber  Heritage  Region  of  PA,  Inc.  

Clarion  River  Signage  and  Access  Improvements

BRC-­‐RCI-­‐13-­‐17

$36,000 $36,000 13 Implementation  (RIV)

$72,000 RIVER_Key

Erie Albion  Borough Albion  Borough  Playground

BRC-­‐SC-­‐7-­‐8 $40,000 $40,000 7 Small  Communities/Small  Projects  (COMM)

$72,000 COMM_Key

Erie Albion  Borough Borough  Park KEY-­‐PRD-­‐4-­‐7

$25,500 $25,500 4 Park  Rehabilitation  and  Development  (COMM)

$51,000 COMM_Key

Erie Cranesville  Borough Borough  Park BRC-­‐SC-­‐11-­‐114

$20,000 $20,000 11 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Erie Cranesville  Borough Borough  Park BRC-­‐SC-­‐6-­‐46

$16,749 $16,800 6 Small  Communities/Small  Projects  (COMM)

$19,749 COMM_Key

Erie East  Erie  Suburban  Recreation  &  Conservation  Authority  

Parking  Area  Improvement

BRC-­‐PRD-­‐11-­‐27

$19,000 $19,000 11 Park  Rehabilitation  and  Development  (COMM)

$38,000 COMM_Key

Page 263: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  263  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Erie East  Erie  Suburban  Recreation  &  Conservation  Authority  

Tri-­‐Community  Swimming  Pool

KEY-­‐PRD-­‐5-­‐54

$60,500 $60,500 5 Park  Rehabilitation  and  Development  (COMM)

$121,000 COMM_Key

Erie Edinboro  Borough Nature's  Outlet KEY-­‐ACQ-­‐2-­‐44

$53,500 $50,000 2 Acquisition  (COMM)

$107,000 COMM_Key

Erie Edinboro  Borough Pool  Feasibility  Study/Master  Site  Plan

BRC-­‐TAG-­‐10-­‐152

$10,000 $10,000 10 Feasibility  Studies  (COMM)

$20,000 COMM_Key

Erie Elk  Creek  Township Wellsburg  Park KEY-­‐SC-­‐4-­‐55 $13,041 $13,000 4 Small  Communities/Small  Projects  (COMM)

$13,041 COMM_Key

Erie Erie  City Columbus  Park KEY-­‐PRD-­‐5-­‐61

$50,000 $50,000 5 Park  Rehabilitation  and  Development  (COMM)

$100,000 COMM_Key

Erie Erie  City Community  Gateway  Garden

KEY-­‐PRD-­‐5-­‐62

$10,000 $10,000 5 Park  Rehabilitation  and  Development  (COMM)

$20,000 COMM_Key

Erie Erie  City Eastside  Greenway  Plan

BRC-­‐TAG-­‐10-­‐153

$25,000 $25,000 10 Greenway  Plans  (COMM)

$50,000 COMM_Key

Erie Erie  City Gridley  Park-­‐  Development

BRC-­‐PRD-­‐16-­‐133

$50,000 $50,000 16 Park  Rehabilitation  and  Development  (COMM)

$100,000 COMM_Key

Page 264: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  264  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Erie Erie  City Griswold  Park  and  Plaza

BRC-­‐PRD-­‐13-­‐103

$450,000 $450,000 13 Park  Rehabilitation  and  Development  (COMM)

$900,000 COMM_Key

Erie Erie  City McClelland  Park  Master  Site  Plan

BRC-­‐TAG-­‐12-­‐236

$12,500 $12,500 12 Master  Site  Plans  (COMM)

$25,000 COMM_Key

Erie Erie  City Skate  Park BRC-­‐PRD-­‐11-­‐30

$82,900 $82,900 11 Park  Rehabilitation  and  Development  (COMM)

$166,500 COMM_Key

Erie Erie  City TreeVitalize  Erie BRC-­‐TV-­‐14-­‐2

$42,685 $42,500 14 Park  Rehabilitation  and  Development  (COMM)

$100,278 COMM_Key

Erie Erie  County Rail-­‐Trail  Feasibility  Study

BRC-­‐RTP-­‐7-­‐3

$15,000 $15,000 7 Feasibility  Studies  (RT)

$30,000 RT_Key

Erie Erie  County Sixmile  Creek  Park  Master  Site  Plan

BRC-­‐TAG-­‐11-­‐205

$12,500 $12,500 11 Master  Site  Plans  (COMM)

$25,000 COMM_Key

Erie Erie  County  Conservation  District  

Headwaters  Conservation  Park

BRC-­‐PRD-­‐11-­‐31

$32,500 $30,000 11 Park  Rehabilitation  and  Development  (COMM)

$75,300 COMM_Key

Erie Erie  County  Convention  Center  Authority  

West  Canal  Basin BRC-­‐PRD-­‐14-­‐132

$55,000 $55,000 14 Park  Rehabilitation  and  Development  (COMM)

$110,100 COMM_Key

Page 265: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  265  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Erie Erie  County  Convention  Center  Authority  

West  Canal  Basin-­‐  Phase  2-­‐  Development

BRC-­‐PRD-­‐16-­‐134

$40,800 $40,800 16 Park  Rehabilitation  and  Development  (COMM)

$140,800 COMM_Key

Erie Erie  Zoological  Society  

Erie  Zoo KEY-­‐PRD-­‐2-­‐46

$165,000 $165,000 2 Park  Rehabilitation  and  Development  (COMM)

$330,000 COMM_Key

Erie Erie  Zoological  Society  

Tiger  Exhibit BRC-­‐PRD-­‐13-­‐104

$150,000 $150,000 13 Park  Rehabilitation  and  Development  (COMM)

$300,000 COMM_Key

Erie Erie  Zoological  Society  

Zoo  Development  -­‐  Phase  V

KEY-­‐ZOO-­‐94-­‐1

$412,500 $412,500 1 Zoo $825,000 COMM_Key

Erie Erie-­‐Western  Pennsylvania  Port  Authority  

Bayfront  Overlook  Greenway  Study

BRC-­‐TAG-­‐6-­‐60

$50,000 $50,000 6 Greenway  Plans  (COMM)

$100,000 COMM_Key

Erie Erie-­‐Western  Pennsylvania  Port  Authority  

Comprehensive  Waterfront  Plan

BRC-­‐TAG-­‐13.3-­‐470

$50,000 $40,000 13.3 Master  Site  Plans  (COMM)

$100,000 COMM_Key

Erie Erie-­‐Western  Pennsylvania  Port  Authority  

Lampe  Marina  Campground

BRC-­‐PRD-­‐7-­‐68

$75,000 $75,000 7 Park  Rehabilitation  and  Development  (COMM)

$200,000 COMM_Key

Page 266: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  266  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Erie Erie-­‐Western  Pennsylvania  Port  Authority  

Lampe-­‐Marina  Campground    -­‐  Phase  2

BRC-­‐PRD-­‐12-­‐153

$148,300 $148,000 12 Park  Rehabilitation  and  Development  (COMM)

$296,500 COMM_Key

Erie Erie-­‐Western  Pennsylvania  Port  Authority  

Liberty  Park  -­‐  Phases  2  &  3

KEY-­‐PRD-­‐5-­‐63

$64,024 $64,000 5 Park  Rehabilitation  and  Development  (COMM)

$128,048 COMM_Key

Erie Erie-­‐Western  Pennsylvania  Port  Authority  

Liberty  Park-­‐  Development

BRC-­‐PRD-­‐16-­‐135

$100,000 $100,000 16 Park  Rehabilitation  and  Development  (COMM)

$400,000 COMM_Key

Erie Erie-­‐Western  Pennsylvania  Port  Authority  

Liberty  Park,  Phase  IV-­‐Observation  Platforms

BRC-­‐PRD-­‐8-­‐65

$50,000 $50,000 8 Park  Rehabilitation  and  Development  (COMM)

$100,000 COMM_Key

Erie Erie-­‐Western  Pennsylvania  Port  Authority  

Perry's  Landing  Park/Seaway  Bike  Trail

KEY-­‐PRD-­‐3-­‐61

$485,080 $425,000 3 Park  Rehabilitation  and  Development  (COMM)

$970,160 COMM_Key

Erie Erie-­‐Western  Pennsylvania  Port  Authority  

Seaway  Trail  Extension  -­‐  Phase  I  &  Phase  II

BRC-­‐PRD-­‐13.3-­‐358

$375,000 $200,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$750,000 COMM_Key

Page 267: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  267  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Erie Erie-­‐Western  Pennsylvania  Port  Authority  

West  Bayfront  Bikeway  Connector

BRC-­‐PRD-­‐8-­‐66

$50,000 $50,000 8 Park  Rehabilitation  and  Development  (COMM)

$350,000 COMM_Key

Erie Fairview  Township Avonia  Beach  Park BRC-­‐PRD-­‐14-­‐139

$421,000 $200,000 14 Park  Rehabilitation  and  Development  (COMM)

$842,000 COMM_Key

Erie Fairview  Township Brugger  Property  Acquisition

BRC-­‐ACQ-­‐11.5-­‐6

$425,000 $375,000 11.5 Acquisition  (COMM)

$950,000 COMM_Key

Erie Fairview  Township Master  Site  Development  Plan

KEY-­‐TAG-­‐3-­‐62

$13,500 $13,500 3 Master  Site  Plans  (COMM)

$27,000 COMM_Key

Erie Fairview  Township Pleasant  Ridge  Park BRC-­‐PRD-­‐7-­‐71

$51,812 $52,000 7 Park  Rehabilitation  and  Development  (COMM)

$103,625 COMM_Key

Erie Girard  Township Elk  Creek  Access KEY-­‐SC-­‐4-­‐63 $20,000 $20,000 4 Small  Communities/Small  Projects  (COMM)

$32,500 COMM_Key

Erie Girard  Township Elk  Creek  Safe  Aerial  Photography  and  Mapping

BRC-­‐TAG-­‐9-­‐85

$11,600 $11,500 9 Master  Site  Plans  (COMM)

$23,300 COMM_Key

Erie Girard  Township Miller  Property  Acquisition

BRC-­‐ACQ-­‐12.5-­‐33

$75,600 $73,000 12.5 Acquisition  (COMM)

$151,200 COMM_Key

Erie Greenfield  Township Township  Park KEY-­‐ACQ-­‐5-­‐75

$9,850 $9,800 5 Acquisition  (COMM)

$19,700 COMM_Key

Page 268: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  268  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Erie Greenfield  Township Walking/ADA/Exercise  Trail  -­‐  Greenfield  Comm.  Park

BRC-­‐SC-­‐8-­‐79

$33,400 $33,000 8 Small  Communities/Small  Projects  (COMM)

$46,900 COMM_Key

Erie Harborcreek  Township

Shades  Beach  Offshore  Improvements

BRC-­‐PRD-­‐11-­‐41

$200,000 $700,000 11 Park  Rehabilitation  and  Development  (COMM)

$2,150,000 COMM_Key

Erie Harborcreek  Township

Shades  Beach  Park BRC-­‐PRD-­‐6-­‐78

$40,000 $40,000 6 Park  Rehabilitation  and  Development  (COMM)

$80,000 COMM_Key

Erie Harborcreek Township Shorewood Park Land Acquisition

BRC-ACQ-19-9

$88,275.00 $88,000.00 19 Acquisition (COMM)

$176,550.00 COMM_Key

Erie Harborcreek Township Shorewood Park Land Acquisition

BRC-ACQ-19-9

$88,275.00 $88,000.00 19 Acquisition (COMM)

$176,550.00 COMM_Key

Erie Harborcreek Township Shorewood Park Land Acquisition

BRC-ACQ-19-9

$88,275.00 $88,000.00 19 Acquisition (COMM)

$176,550.00 COMM_Key

Erie Lake  City  Borough Miles  Grove  Park  -­‐  Phase  I

KEY-­‐PRD-­‐5-­‐105

$50,000 $50,000 5 Park  Rehabilitation  and  Development  (COMM)

$134,000 COMM_Key

Erie Lake  Erie  Region  Conservancy  

Allison  Property  Conservation  Easement  Acquisition

BRC-­‐LTA-­‐13.6-­‐611

$550,000 $550,000 13.6 Open  Space  Acquisition  (LT)

$1,109,600 LT_Key

Page 269: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  269  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Erie Lake  Erie  Region  Conservancy  

Holzhausen  Property  Conservation  Easement

BRC-­‐LTA-­‐16-­‐32

$246,900 $246,900 16 Open  Space  Acquisition  (LT)

$493,800 LT_Key

Erie Lake  Erie  Region  Conservancy  

Jenks  Property  Acquisition

BRC-­‐LTA-­‐13.3-­‐518

$101,900 $101,800 13.3 Open  Space  Acquisition  (LT)

$203,700 LT_Key

Erie Lake  Erie  Region  Conservancy  

Lake  Erie  Watershed  Conservation  Plan

BRC-­‐RCP-­‐8-­‐26

$183,000 $175,000 8 Planning  (RIV) $407,900 RIVER_Key

Erie Lake  Erie  Region  Conservancy  

Rand  Property  Acquisition

BRC-­‐LTA-­‐14-­‐32

$146,200 $146,000 14 Critical  Habitat  Acquisition  (LT)

$292,400 LT_Key

Erie Lawrence  Park  Township

Barringer  Playground BRC-­‐SC-­‐6-­‐93

$20,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$51,100 COMM_Key

Erie Lawrence  Park  Township

Fourmile  Creek  Fish  Ladder  Installation

BRC-­‐RCD-­‐13-­‐510

$52,500 $52,500 13 Development  (RIV)

$105,000 RIVER_Key

Erie Lawrence Park Township

Lakeclif, Napier and Teker Parks - Development

BRC-PRD-19-90

$267,100.00 $267,100.00 19 Park Rehabilitation and Development (COMM)

$534,200.00 COMM_Key

Erie Lawrence Park Township

Lakeclif, Napier and Teker Parks - Development

BRC-PRD-19-90

$267,100.00 $267,100.00 19 Park Rehabilitation and Development (COMM)

$534,200.00 COMM_Key

Page 270: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  270  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Erie Lawrence Park Township

Lakeclif, Napier and Teker Parks - Development

BRC-PRD-19-90

$267,100.00 $267,100.00 19 Park Rehabilitation and Development (COMM)

$534,200.00 COMM_Key

Erie Lawrence  Park  Township

Napier  Park  Master  Site  Plan

BRC-­‐TAG-­‐16-­‐60

$15,750 $15,700 16 Master  Site  Plans  (COMM)

$31,500 COMM_Key

Erie McKean  Recreation  Authority  

McKean  Community  Park

KEY-­‐PRD-­‐1-­‐80

$34,700 $34,700 1 Park  Rehabilitation  and  Development  (COMM)

$91,700 COMM_Key

Erie McKean  Recreation  Authority  

McKean  Community  Park

KEY-­‐SC-­‐3-­‐130

$20,000 $20,000 3 Small  Communities/Small  Projects  (COMM)

$22,000 COMM_Key

Erie McKean Township Master Site/Trail Network Plan

BRC-TAG-19-137

$12,500.00 $12,500.00 19 Master Site Plans (COMM)

$26,500.00 COMM_Key

Erie McKean Township Master Site/Trail Network Plan

BRC-TAG-19-137

$12,500.00 $12,500.00 19 Master Site Plans (COMM)

$26,500.00 COMM_Key

Erie McKean Township Master Site/Trail Network Plan

BRC-TAG-19-137

$12,500.00 $12,500.00 19 Master Site Plans (COMM)

$26,500.00 COMM_Key

Erie Millcreek  Township Asbury  Community  Park

BRC-­‐PRD-­‐6-­‐113

$100,000 $100,000 6 Park  Rehabilitation  and  Development  (COMM)

$200,000 COMM_Key

Erie Millcreek  Township Belle  Valley  Swimming  Pool

KEY-­‐PRD-­‐2-­‐100

$250,000 $250,000 2 Park  Rehabilitation  and  Development  (COMM)

$610,000 COMM_Key

Page 271: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  271  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Erie Millcreek  Township Cassidy  Park  Master  Plan

BRC-­‐TAG-­‐12-­‐251

$12,500 $12,500 12 Master  Site  Plans  (COMM)

$25,000 COMM_Key

Erie Millcreek  Township Cassidy  Property  Acquisition

BRC-­‐ACQ-­‐11.5-­‐11

$217,000 $217,000 11.5 Acquisition  (COMM)

$433,900 COMM_Key

Erie Millcreek  Township Chestnut  Hill  Playground

KEY-­‐PRD-­‐4-­‐103

$25,000 $25,000 4 Park  Rehabilitation  and  Development  (COMM)

$50,000 COMM_Key

Erie Millcreek  Township Greenway  Plan KEY-­‐TAG-­‐3-­‐138

$17,700 $17,700 3 Greenway  Plans  (COMM)

$35,400 COMM_Key

Erie Millcreek  Township Millcreek  Township  Golf  Course

BRC-­‐PRD-­‐8-­‐119

$200,000 $200,000 8 Park  Rehabilitation  and  Development  (COMM)

$2,900,200 COMM_Key

Erie Millcreek  Township Veterans  Park  -­‐  Phase  1  -­‐  Development

BRC-­‐PRD-­‐16-­‐146

$103,197 $104,000 16 Park  Rehabilitation  and  Development  (COMM)

$349,045 COMM_Key

Erie Millcreek  Township Veterans  Park  -­‐  Phase  2  -­‐  Development

BRC-­‐PRD-­‐17-­‐138

$101,585 $101,500 17 Park  Rehabilitation  and  Development  (COMM)

$203,170 COMM_Key

Erie Millcreek  Township Zimmerly  Road  Park BRC-­‐RCD-­‐14-­‐295

$100,000 $100,000 14 Development  (RIV)

$400,000 RIVER_Key

Page 272: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  272  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Erie North  East  Borough Heard  Memorial  Park

BRC-­‐PRD-­‐7-­‐138

$150,000 $150,000 7 Park  Rehabilitation  and  Development  (COMM)

$302,000 COMM_Key

Erie North  East  Township Semelka/Hoyt  Land  Acquisition

BRC-­‐ACQ-­‐12-­‐75

$70,300 $63,000 12 Acquisition  (COMM)

$140,600 COMM_Key

Erie Northwest  Pennsylvania  Trail  Association  

Corry  Junction  Rail  Trail  Construction

BRC-­‐RTD-­‐13.3-­‐502

$375,000 $175,000 13.3 Rail  Rehabilitation  and  Development  (RT)

$750,000 RT_Key

Erie Paddle  Without  Pollution  

Presque  Isle  State  Park  Water  Trail

BRC-­‐TAG-­‐18-­‐159

$18,650 $18,600 18 Trail  Study  (COMM)

$37,300 RIVER_Key

Erie Springfield  Township Lakefront  Parks  Master  Site  Plans

BRC-­‐TAG-­‐13.3-­‐495

$30,000 $30,000 13.3 Master  Site  Plans  (COMM)

$72,000 COMM_Key

Erie Springfield  Township Raccoon  Creek  Park  -­‐  Development

BRC-­‐PRD-­‐17-­‐152

$152,800 $152,000 17 Park  Rehabilitation  and  Development  (COMM)

$310,300 COMM_Key

Erie Summit  Township Picnicana  Park KEY-­‐PRD-­‐3-­‐210

$50,950 $50,000 3 Park  Rehabilitation  and  Development  (COMM)

$101,900 COMM_Key

Erie Union  City  Borough Caflisch,  Tot  Lot  and  SW  Parks

KEY-­‐SC-­‐1-­‐139

$18,876 $18,900 1 Small  Communities/Small  Projects  (COMM)

$39,252 COMM_Key

Page 273: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  273  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Erie Venango  Township Community  Park KEY-­‐SC-­‐4-­‐161

$20,000 $20,000 4 Small  Communities/Small  Projects  (COMM)

$25,900 COMM_Key

Erie Washington  Township

Memorial  Park BRC-­‐TAG-­‐7-­‐202

$12,500 $12,500 7 Master  Site  Plans  (COMM)

$25,000 COMM_Key

Erie Washington  Township

Wainer  Park BRC-­‐PRD-­‐9-­‐223

$69,300 $69,000 9 Park  Rehabilitation  and  Development  (COMM)

$138,600 COMM_Key

Erie Wattsburg  Borough Harwood  Tri-­‐Community  Park

KEY-­‐SC-­‐5-­‐216

$20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$26,289 COMM_Key

Erie Western  Pennsylvania  Conservancy  

Lake  Pleasant BRC-­‐LTA-­‐7-­‐22

$136,000 $136,000 7 Critical  Habitat  Acquisition  (LT)

$272,000 LT_Key

Erie Western  Pennsylvania  Conservancy  

Lake  Pleasant  Natural  Area

KEY-­‐LTA-­‐1-­‐17

$125,000 $125,000 1 Critical  Habitat  Acquisition  (LT)

$250,000 LT_Key

Erie Western  Pennsylvania  Conservancy  

Lake  Pleasant  Natural  Area

KEY-­‐LTA-­‐5-­‐21

$48,775 $45,000 5 Critical  Habitat  Acquisition  (LT)

$97,550 LT_Key

Erie Western  Pennsylvania  Conservancy  

Lowville  Fen KEY-­‐LTA-­‐2-­‐14

$123,000 $123,000 2 Critical  Habitat  Acquisition  (LT)

$246,000 LT_Key

Erie Western  Pennsylvania  Conservancy  

Reliant  Energy  Tract  (Coho)

BRC-­‐LTA-­‐10-­‐1

$1,500,000 $1,500,000 10 Open  Space  Acquisition  (LT)

$3,000,000 LT_Key

Page 274: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  274  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Erie Western  Pennsylvania  Conservancy  

Roderick  Wildlife  Reserve  Expansion

BRC-­‐LTA-­‐16-­‐87

$250,000 $250,000 16 Open  Space  Acquisition  (LT)

$723,990 LT_Key

Erie Western  Pennsylvania  Conservancy  

Volkman  Tract  Acquisition

BRC-­‐LTA-­‐13-­‐26

$124,600 $86,000 13 Critical  Habitat  Acquisition  (LT)

$249,100 LT_Key

Fayette Brownsville  Area  Revitalization  Corporation  

Brownsville  Steamboat  Museum

KEY-­‐RCI-­‐5-­‐14

$50,000 $60,000 5 Implementation  (RIV)

$100,000 RIVER_Key

Fayette Brownsville  Borough Community  Gateways  and  Gardens

KEY-­‐SC-­‐4-­‐20 $12,100 $12,100 4 Small  Communities/Small  Projects  (COMM)

$24,100 COMM_Key

Fayette Brownsville  Borough Community  Park BRC-­‐PRD-­‐6-­‐25

$30,600 $30,000 6 Park  Rehabilitation  and  Development  (COMM)

$80,000 COMM_Key

Fayette Brownsville  Borough Fenwick  Park KEY-­‐SC-­‐1-­‐21 $20,000 $20,000 1 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Fayette Brownsville  Borough Fenwick  Park  Improvement

BRC-­‐SC-­‐9-­‐36

$33,400 $33,000 9 Small  Communities/Small  Projects  (COMM)

$47,900 COMM_Key

Fayette Brownsville  Borough Monongahela  River  Watershed  Plan

KEY-­‐RCP-­‐95-­‐11

$20,000 $20,000 1 Planning  (RIV) $41,000 RIVER_Key

Fayette Brownsville  Borough Riverside  Wharf  Park  -­‐  Phase  II

BRC-­‐RCD-­‐8-­‐22

$125,000 $125,000 8 Development  (RIV)

$403,700 RIVER_Key

Page 275: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  275  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Fayette Bullskin  Township Jacob's  Creek  Park KEY-­‐PRD-­‐3-­‐26

$88,139 $50,000 3 Park  Rehabilitation  and  Development  (COMM)

$176,278 COMM_Key

Fayette Connellsville  City East  Park BRC-­‐PRD-­‐6-­‐44

$275,000 $225,000 6 Park  Rehabilitation  and  Development  (COMM)

$550,000 COMM_Key

Fayette Connellsville  City Gateway  to  Gateway  on  the  GAP  in  Connellsville

BRC-­‐TAG-­‐13.6-­‐591

$100,000 $100,000 13.6 Master  Site  Plans  (COMM)

$220,000 COMM_Key

Fayette Connellsville  City Yough  River  Park BRC-­‐PRD-­‐15-­‐56

$204,500 $204,500 15 Park  Rehabilitation  and  Development  (COMM)

$409,000 COMM_Key

Fayette Dunbar  Borough Community  Park BRC-­‐SC-­‐10-­‐74

$25,500 $25,000 10 Small  Communities/Small  Projects  (COMM)

$33,000 COMM_Key

Fayette Fayette  County Fayette  County  Parks BRC-­‐PRD-­‐7-­‐73

$53,542 $45,000 7 Park  Rehabilitation  and  Development  (COMM)

$110,728 COMM_Key

Fayette Fayette  County Feasibility  Study KEY-­‐RTP-­‐3-­‐7 $15,000 $15,000 3 Feasibility  Studies  (RT)

$30,000 RT_Key

Page 276: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  276  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Fayette Fayette  County German-­‐Masontown  Park

KEY-­‐PRD-­‐3-­‐64

$13,800 $13,800 3 Park  Rehabilitation  and  Development  (COMM)

$27,600 COMM_Key

Fayette Fayette  County German/Masontown  Park

BRC-­‐PRD-­‐9-­‐75

$22,000 $22,000 9 Park  Rehabilitation  and  Development  (COMM)

$44,100 COMM_Key

Fayette Fayette  County Natural  Heritage  Inventory

KEY-­‐TAG-­‐3-­‐63

$40,400 $40,000 3 Natural  Areas  Inventories  (COMM)

$80,800 COMM_Key

Fayette Fayette County Sheepskin Trail - Point Marion Segment - Development

BRC-RTD-19-152

$150,000.00 $150,000.00 19 Rail Rehabilitation and Development (RT)

$328,461.00 COMM_Key

Fayette Fayette County Sheepskin Trail - Point Marion Segment - Development

BRC-RTD-19-152

$150,000.00 $150,000.00 19 Rail Rehabilitation and Development (RT)

$328,461.00 COMM_Key

Fayette Fayette County Sheepskin Trail - Point Marion Segment - Development

BRC-RTD-19-152

$150,000.00 $150,000.00 19 Rail Rehabilitation and Development (RT)

$328,461.00 COMM_Key

Fayette Fayette County Sheepskin Trail - Point Marion Segment - Development

BRC-RTD-19-152

$150,000.00 $150,000.00 19 Rail Rehabilitation and Development (RT)

$328,461.00 COMM_Key

Page 277: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  277  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Fayette Fayette  County Sheepskin  Trail  North

BRC-­‐RTD-­‐10-­‐7

$55,000 $55,000 10 Rail  Rehabilitation  and  Development  (RT)

$110,000 RT_Key

Fayette Franklin  Township Franklin  Community  Swimming  Pool

BRC-­‐PRD-­‐14-­‐141

$561,400 $550,000 14 Park  Rehabilitation  and  Development  (COMM)

$1,122,800 COMM_Key

Fayette Henry  Clay  Township Community  Park BRC-­‐SC-­‐10-­‐81

$24,421 $24,000 10 Small  Communities/Small  Projects  (COMM)

$40,000 COMM_Key

Fayette Henry  Clay  Township Community  Park KEY-­‐ACQ-­‐3-­‐87

$19,200 $19,200 3 Acquisition  (COMM)

$38,400 COMM_Key

Fayette Henry  Clay  Township Henry  Clay  Community  Park

BRC-­‐TAG-­‐7-­‐84

$8,750 $8,700 7 Master  Site  Plans  (COMM)

$17,400 COMM_Key

Fayette Henry  Clay  Township Henry  Clay  Township  Park  -­‐  Phase  I

BRC-­‐SC-­‐8-­‐85

$30,000 $30,000 8 Small  Communities/Small  Projects  (COMM)

$40,000 COMM_Key

Fayette Jefferson  Township Jack  Freeman  Memorial  Park

BRC-­‐SC-­‐7-­‐93

$20,000 $20,000 7 Small  Communities/Small  Projects  (COMM)

$20,500 COMM_Key

Fayette Jefferson  Township Jack  Freeman  Park BRC-­‐SC-­‐12-­‐101

$21,000 $21,000 12 Small  Communities/Small  Projects  (COMM)

$24,000 COMM_Key

Page 278: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  278  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Fayette Jefferson Township Jefferson Township Park - Development

BRC-SC-19-42

$30,000.00 $30,000.00 19 Small Communities/Small Projects (COMM)

$40,000.00 COMM_Key

Fayette Jefferson Township Jefferson Township Park - Development

BRC-SC-19-42

$30,000.00 $30,000.00 19 Small Communities/Small Projects (COMM)

$40,000.00 COMM_Key

Fayette Jefferson Township Jefferson Township Park - Development

BRC-SC-19-42

$30,000.00 $30,000.00 19 Small Communities/Small Projects (COMM)

$40,000.00 COMM_Key

Fayette Luzerne  Township Monongahela  River  Boat  Docks  (E.  Fredericktown)

KEY-­‐RCD-­‐5-­‐15

$14,000 $14,000 5 Development  (RIV)

$28,000 RIVER_Key

Fayette Luzerne  Township Patsy  Hillman  Park  MSP

BRC-­‐TAG-­‐10-­‐158

$45,000 $45,000 10 Master  Site  Plans  (COMM)

$90,000 COMM_Key

Fayette Markleysburg  Borough

Borough  Park KEY-­‐SC-­‐5-­‐124

$19,902 $20,000 5 Small  Communities/Small  Projects  (COMM)

$19,902 COMM_Key

Fayette Masontown  Borough

Jefferson  Avenue  Park

KEY-­‐SC-­‐5-­‐125

$20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$21,377 COMM_Key

Fayette Masontown  Borough

Redwood  Street  and  Jefferson  Avenue  Parks

BRC-­‐SC-­‐8-­‐115

$20,000 $28,000 8 Small  Communities/Small  Projects  (COMM)

$36,000 COMM_Key

Page 279: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  279  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Fayette Masontown  Borough

Redwood  Street  Park BRC-­‐SC-­‐6-­‐108

$20,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$20,700 COMM_Key

Fayette Menallen  Township Township  Playground

KEY-­‐SC-­‐3-­‐132

$19,400 $19,400 3 Small  Communities/Small  Projects  (COMM)

$23,300 COMM_Key

Fayette Newell  Borough 2nd  St.  Park,  4th  St.  Park,  &  Mun.  Park

KEY-­‐SC-­‐2-­‐111

$19,852 $19,800 2 Small  Communities/Small  Projects  (COMM)

$21,402 COMM_Key

Fayette Ohiopyle  Borough "Stewart  on  the  Green"  Playground

BRC-­‐PRD-­‐13.3-­‐314

$48,000 $262,500 13.3 Small  Communities/Small  Projects  (COMM)

$600,000 COMM_Key

Fayette Ohiopyle  Borough "Stewart  Place  on  the  Green"

KEY-­‐SC-­‐5-­‐153

$17,000 $17,000 5 Small  Communities/Small  Projects  (COMM)

$14,882 COMM_Key

Fayette Perry  Township Star  Junction  Memorial  Park  Development

BRC-­‐SC-­‐12-­‐115

$20,900 $23,900 12 Small  Communities/Small  Projects  (COMM)

$25,500 COMM_Key

Fayette Perry  Township Whitsett  Park BRC-­‐SC-­‐14-­‐100

$38,800 $38,000 14 Small  Communities/Small  Projects  (COMM)

$57,600 COMM_Key

Fayette Perryopolis  Borough Perryopolis  Rail-­‐Trail  Project

KEY-­‐RTP-­‐5-­‐12

$5,000 $5,000 5 Feasibility  Studies  (RT)

$10,000 RT_Key

Page 280: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  280  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Fayette Perryopolis  Parks  and  Recreation  Authority  

Sampey  Park BRC-­‐SC-­‐6-­‐237

$20,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Fayette Point  Marion  Borough

Community  Park BRC-­‐SC-­‐11-­‐149

$40,000 $40,000 11 Small  Communities/Small  Projects  (COMM)

$66,000 COMM_Key

Fayette Point  Marion  Borough

Community  Park  Enhancement  -­‐  Phase  Two

BRC-­‐PRD-­‐12-­‐283

$179,800 $179,000 12 Park  Rehabilitation  and  Development  (COMM)

$359,600 COMM_Key

Fayette Point  Marion  Borough

Point  Marion  Park KEY-­‐SC-­‐3-­‐179

$20,000 $20,000 3 Small  Communities/Small  Projects  (COMM)

$23,200 COMM_Key

Fayette Redstone  Township Redstone  Park BRC-­‐PRD-­‐6-­‐157

$68,800 $30,000 6 Park  Rehabilitation  and  Development  (COMM)

$137,600 COMM_Key

Fayette Redstone  Township Rotary  Park KEY-­‐PRD-­‐1-­‐114

$10,000 $10,000 1 Park  Rehabilitation  and  Development  (COMM)

$20,000 COMM_Key

Fayette Saltlick  Township Indian  Creek  Valley  Trail

KEY-­‐SC-­‐1-­‐122

$18,000 $18,000 1 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Page 281: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  281  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Fayette Saltlick  Township Indian  Creek  Valley  Trail

KEY-­‐SC-­‐4-­‐134

$20,000 $20,000 4 Small  Communities/Small  Projects  (COMM)

$22,138 COMM_Key

Fayette Saltlick  Township Melcroft  Trestle  Access

KEY-­‐SC-­‐2-­‐134

$20,000 $20,000 2 Small  Communities/Small  Projects  (COMM)

$22,000 COMM_Key

Fayette South  Connellsville  Borough

Borough  Park KEY-­‐SC-­‐1-­‐128

$20,000 $20,000 1 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Fayette South  Union  Township

Two  Sites KEY-­‐PRD-­‐4-­‐145

$67,139 $65,000 4 Park  Rehabilitation  and  Development  (COMM)

$134,278 COMM_Key

Fayette Springfield  Township Mill  Run  Park BRC-­‐SC-­‐8-­‐186

$27,000 $27,000 8 Small  Communities/Small  Projects  (COMM)

$34,000 COMM_Key

Fayette Springhill  Township Georges  Creek  Watershed  Conservation  Plan

BRC-­‐RCP-­‐8-­‐21

$20,000 $20,000 8 Planning  (RIV) $40,000 RIVER_Key

Fayette Uniontown  City Bailey  Park-­‐Development

BRC-­‐PRD-­‐17-­‐156

$102,366 $102,400 17 Park  Rehabilitation  and  Development  (COMM)

$242,729 COMM_Key

Page 282: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  282  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Fayette Washington  Township

Municipal  Park KEY-­‐SC-­‐2-­‐168

$20,000 $20,000 2 Small  Communities/Small  Projects  (COMM)

$27,000 COMM_Key

Fayette Washington  Township

Washington  Township  Veterans'  Park

BRC-­‐SC-­‐8-­‐209

$30,000 $30,000 8 Small  Communities/Small  Projects  (COMM)

$50,000 COMM_Key

Fayette Western  Pennsylvania  Conservancy  

Bear  Run  Nature  Reserve

BRC-­‐LTA-­‐9-­‐23

$215,400 $215,000 9 Critical  Habitat  Acquisition  (LT)

$430,800 LT_Key

Fayette Western  Pennsylvania  Conservancy  

Forbes-­‐Fort  Necessity  Connector  Acquisition

BRC-­‐LTA-­‐18-­‐20

$550,000 $550,000 18 Open  Space  Acquisition  (LT)

$2,554,461 LT_Key

Fayette Western  Pennsylvania  Conservancy  

Jones  Tract  Acquisition

BRC-­‐LTA-­‐13.3-­‐535

$235,000 $221,000 13.3 Open  Space  Acquisition  (LT)

$471,900 LT_Key

Fayette Western  Pennsylvania  Conservancy  

Ruane  Tract  Acquisition

BRC-­‐LTA-­‐11-­‐27

$336,000 $340,000 11 Open  Space  Acquisition  (LT)

$680,000 LT_Key

Fayette Western  Pennsylvania  Conservancy  

Ulderich  Property KEY-­‐LTA-­‐1-­‐16

$214,000 $100,000 1 Open  Space  Acquisition  (LT)

$200,000 LT_Key

Fayette Wharton  Township Recreational  Park KEY-­‐PRD-­‐3-­‐240

$26,200 $26,200 3 Park  Rehabilitation  and  Development  (COMM)

$52,400 COMM_Key

Page 283: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  283  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Fayette,  Somerset

Western  Pennsylvania  Conservancy  

Casselman  River  Recreation  Guide

BRC-­‐RCI-­‐14-­‐291

$43,500 $43,500 14 Implementation  (RIV)

$87,000 RIVER_Key

Fayette,  Westmoreland

Mountain  Watershed  Association,  Inc.  

Indian  Creek  Valley  Bike  Trail  Feasibility  Study

BRC-­‐RTP-­‐11-­‐9

$18,900 $18,900 11 Feasibility  Studies  (RT)

$37,700 RT_Key

Forest Barnett  Township Township  Canoe  Access

KEY-­‐SC-­‐3-­‐10 $16,725 $23,099 3 Small  Communities/Small  Projects  (COMM)

$17,825 COMM_Key

Forest Forest  County Comprehensive  County-­‐wide  GIS

BRC-­‐TAG-­‐10-­‐154

$307,500 $90,000 10 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$429,600 COMM_Key

Forest Jenks  Township MACA  Park BRC-­‐PRD-­‐13.3-­‐376

$158,665 $150,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$308,665 COMM_Key

Forest Jenks  Township Town  Center  Gazebo-­‐  Development

BRC-­‐SC-­‐16-­‐44

$20,000 $23,000 16 Small  Communities/Small  Projects  (COMM)

$26,000 COMM_Key

Forest Tionesta  Borough Borough  Park KEY-­‐SC-­‐2-­‐155

$15,460 $15,400 2 Small  Communities/Small  Projects  (COMM)

$15,460 COMM_Key

Forest Tionesta  Borough Community  Recreation  Center

BRC-­‐SC-­‐10-­‐101

$40,000 $40,000 10 Small  Communities/Small  Projects  (COMM)

$60,600 COMM_Key

Page 284: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  284  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Franklin Antrim  Township Community  Park BRC-­‐PRD-­‐6-­‐12

$50,000 $50,000 6 Park  Rehabilitation  and  Development  (COMM)

$100,000 COMM_Key

Franklin Antrim  Township Community  Park  -­‐  Phase  III

BRC-­‐PRD-­‐14-­‐110

$236,700 $225,000 14 Park  Rehabilitation  and  Development  (COMM)

$473,400 COMM_Key

Franklin Chambersburg  Borough

Chambersburg  Comp.  Rec.  Plan/Master  Site  Plan

BRC-­‐TAG-­‐8-­‐37

$22,500 $22,500 8 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$45,000 COMM_Key

Franklin Chambersburg  Borough

Chambersburg  Rail-­‐Trail

BRC-­‐RTD-­‐10-­‐2

$147,000 $50,000 10 Rail  Rehabilitation  and  Development  (RT)

$759,200 COMM_Key

Franklin Chambersburg  Borough

Chambersburg  Rail-­‐Trail

BRC-­‐RTD-­‐10-­‐2

$147,000 $97,000 10 Rail  Rehabilitation  and  Development  (RT)

$759,200 RT_Key

Franklin Chambersburg  Borough

Feasibility  Study KEY-­‐RTP-­‐3-­‐2 $18,500 $18,500 3 Feasibility  Studies  (RT)

$37,000 RT_Key

Franklin Chambersburg  Borough

Mike  Waters  Memorial  Park  -­‐  Phase-­‐2-­‐Development

BRC-­‐PRD-­‐18-­‐54

$150,000 $150,000 18 Park  Rehabilitation  and  Development  (COMM)

$324,999 COMM_Key

Page 285: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  285  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Franklin Franklin  County Comprehensive  Recreation,  Park  &  Open  Sp

KEY-­‐TAG-­‐3-­‐70

$25,000 $25,000 3 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$50,000 COMM_Key

Franklin Franklin  County Greenway  and  Open  Space  Plan

BRC-­‐TAG-­‐11-­‐206

$37,500 $37,500 11 Greenway  Plans  (COMM)

$75,000 COMM_Key

Franklin Greencastle  Area,  Franklin  County,    Water  Authority  

Greencastle-­‐Antrim  School  District  Land  Acquisiton

BRC-­‐ACQ-­‐13.3-­‐278

$62,600 $62,000 13.3 Acquisition  (COMM)

$125,300 COMM_Key

Franklin Greene  Township Corker  Hill  Acquisition  (Environmental  Ed.  Center)

BRC-­‐ACQ-­‐14-­‐58

$340,205 $300,000 14 Acquisition  (COMM)

$678,200 COMM_Key

Franklin Montgomery  Township

Park  Acquisition BRC-­‐ACQ-­‐8-­‐121

$151,000 $145,000 8 Acquisition  (COMM)

$302,000 COMM_Key

Franklin Quincy  Township Fritz  Land  Acquisition

BRC-­‐ACQ-­‐15-­‐47

$75,250 $75,000 15 Acquisition  (COMM)

$150,500 COMM_Key

Franklin Quincy  Township Municipal  Park  Master  Site  Plan

BRC-­‐TAG-­‐14-­‐235

$12,500 $12,500 14 Master  Site  Plans  (COMM)

$25,000 COMM_Key

Franklin Quincy  Township Township  Park-­‐  Phase  1-­‐  Development

BRC-­‐PRD-­‐16-­‐155

$100,000 $100,000 16 Park  Rehabilitation  and  Development  (COMM)

$199,823 COMM_Key

Franklin Shippensburg  Borough

Memorial  Park  Pool-­‐Phase  II

BRC-­‐PRD-­‐8-­‐172

$47,000 $47,000 8 Park  Rehabilitation  and  Development  (COMM)

$118,800 COMM_Key

Page 286: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  286  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Franklin The Conservation Fund

Eagle Rock Land Acquisition

BRC-LTA-19-27

########## ########## 19 Open Space Acquisition (LT)

$3,750,000.00 LT_Key

Franklin The Conservation Fund

Eagle Rock Land Acquisition

BRC-LTA-19-27

########## ########## 19 Open Space Acquisition (LT)

$3,750,000.00 LT_Key

Franklin The Conservation Fund

Eagle Rock Land Acquisition

BRC-LTA-19-27

########## ########## 19 Open Space Acquisition (LT)

$3,750,000.00 LT_Key

Franklin Washington  Township

Cantwell  Land  Acquisition

BRC-­‐ACQ-­‐16-­‐28

$49,950 $41,900 16 Acquisition  (COMM)

$102,850 COMM_Key

Franklin Washington  Township

Master  Site  Development  Plan

KEY-­‐TAG-­‐3-­‐228

$10,000 $10,000 3 Master  Site  Plans  (COMM)

$20,000 COMM_Key

Franklin Washington  Township

Pine  Hill  Park  Expansion

BRC-­‐ACQ-­‐7-­‐203

$35,450 $35,000 7 Acquisition  (COMM)

$70,900 COMM_Key

Franklin Washington  Township

Pine  Hill  Recreation  Area

BRC-­‐PRD-­‐8-­‐208

$55,000 $55,000 8 Park  Rehabilitation  and  Development  (COMM)

$112,400 COMM_Key

Franklin Waynesboro  Borough

Memorial  Park-­‐Development

BRC-­‐PRD-­‐15-­‐73

$79,835 $50,000 15 Park  Rehabilitation  and  Development  (COMM)

$159,670 COMM_Key

Franklin Waynesboro  Borough

Northside  Pool  Feasibility  Study

KEY-­‐TAG-­‐3-­‐229

$5,500 $5,500 3 Feasibility  Studies  (COMM)

$11,000 COMM_Key

Fulton McConnellsburg  Borough

Lions  Recreation  Bldg.  Feasibility  Study

BRC-­‐TAG-­‐9-­‐130

$12,500 $9,130 9 Feasibility  Studies  (COMM)

$25,000 COMM_Key

Page 287: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  287  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Fulton McConnellsburg  Borough

Peer-­‐to-­‐Peer BRC-­‐TAG-­‐9-­‐2

$7,500 $7,500 9 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$8,250 COMM_Key

Greene Greene  County Dunkard  Creek  Watershed  Cons.  Plan

KEY-­‐RCP-­‐95-­‐18

$14,200 $14,200 1 Planning  (RIV) $28,400 RIVER_Key

Greene Greene  County  Industrial  Development  Authority  

The  Greene  Trail KEY-­‐RTD-­‐5-­‐6

$128,000 $80,000 5 Rail  Rehabilitation  and  Development  (RT)

$640,000 RT_Key

Greene Greensboro  Borough Greensboro  Canoe/Kayak  Launch  -­‐  Development

BRC-­‐PRD-­‐17-­‐122

$44,200 $44,200 17 Park  Rehabilitation  and  Development  (COMM)

$88,160 COMM_Key

Greene Greensboro  Borough Greensboro  Trail BRC-­‐PRD-­‐13-­‐106

$586,000 $561,000 13 Park  Rehabilitation  and  Development  (COMM)

$1,172,000 COMM_Key

Greene Jefferson  Township Community  Park KEY-­‐SC-­‐2-­‐70 $18,275 $18,200 2 Small  Communities/Small  Projects  (COMM)

$18,500 COMM_Key

Greene Jefferson-­‐Morgan  Regional  Council  of  Governments  

Beagle  Club  Road  &  Route  188  Park  Boat  Launches  -­‐  Development

BRC-­‐PRD-­‐16-­‐140

$126,560 $126,000 16 Park  Rehabilitation  and  Development  (COMM)

$253,120 COMM_Key

Page 288: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  288  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Greene Jefferson-­‐Morgan  Regional  Council  of  Governments  

Crawford  Park  and  Clarksville  Canoe/Kayak  Launch  -­‐  Development

BRC-­‐PRD-­‐17-­‐126

$119,600 $119,600 17 Park  Rehabilitation  and  Development  (COMM)

$239,660 COMM_Key

Greene Morris  Township Morris  Township  Community  Center

BRC-­‐SC-­‐8-­‐122

$40,000 $40,000 8 Small  Communities/Small  Projects  (COMM)

$64,000 COMM_Key

Greene Perry  Township Community  Park BRC-­‐SC-­‐9-­‐164

$20,000 $20,000 9 Small  Communities/Small  Projects  (COMM)

$42,000 COMM_Key

Greene Perry  Township Community  Park KEY-­‐SC-­‐2-­‐119

$13,993 $14,000 2 Small  Communities/Small  Projects  (COMM)

$17,840 COMM_Key

Greene Rices  Landing  Borough

Boat  Docks BRC-­‐SC-­‐9-­‐176

$19,900 $19,000 9 Small  Communities/Small  Projects  (COMM)

$19,900 COMM_Key

Greene Southwestern  Pennsylvania  Water  Authority  

Wisecarver  Recreation  Area  Master  Site  Plan

BRC-­‐TAG-­‐14-­‐243

$25,000 $25,000 14 Master  Site  Plans  (COMM)

$50,000 COMM_Key

Greene Southwestern  Pennsylvania  Water  Authority  

Wisecarver  Recreation  Area,  Phase  1-­‐Development

BRC-­‐PRD-­‐16-­‐161

$100,000 $100,000 16 Park  Rehabilitation  and  Development  (COMM)

$200,000 COMM_Key

Page 289: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  289  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Greene Waynesburg  Borough

Community  Flower  Garden

KEY-­‐SC-­‐5-­‐217

$19,636 $20,000 5 Small  Communities/Small  Projects  (COMM)

$19,636 COMM_Key

Greene Waynesburg  Borough

Meadowlark  Park BRC-­‐SC-­‐6-­‐194

$20,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$33,427 COMM_Key

Huntingdon Alexandria  Borough Borough  Park BRC-­‐SC-­‐10-­‐189

$25,000 $25,000 10 Small  Communities/Small  Projects  (COMM)

$30,000 COMM_Key

Huntingdon Alexandria  Borough Canal  Park BRC-­‐SC-­‐14-­‐74

$31,600 $31,600 14 Small  Communities/Small  Projects  (COMM)

$43,200 COMM_Key

Huntingdon Broad  Top  City  Borough

Broad  Top  City  Park  Acquisition

BRC-­‐ACQ-­‐11-­‐169

$62,300 $46,000 11 Acquisition  (COMM)

$124,700 COMM_Key

Huntingdon Carbon  Township Township  Park BRC-­‐SC-­‐6-­‐29

$20,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Huntingdon Central  Pennsylvania  Conservancy  

Thousand  Steps KEY-­‐LTA-­‐4-­‐3 $97,000 $95,000 4 Critical  Habitat  Acquisition  (LT)

$194,000 LT_Key

Huntingdon Huntingdon  Borough Feasibility  Study  for  Swimming  Pool

KEY-­‐TAG-­‐3-­‐95

$5,500 $5,500 3 Feasibility  Studies  (COMM)

$11,000 COMM_Key

Page 290: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  290  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Huntingdon Huntingdon  Borough Huntingdon  Community  Center  Swimming  Pool

BRC-­‐PRD-­‐7-­‐88

$500,000 $350,000 7 Park  Rehabilitation  and  Development  (COMM)

$1,050,231 COMM_Key

Huntingdon Huntingdon  Borough Portstown  Park KEY-­‐PRD-­‐5-­‐92

$45,255 $40,000 5 Park  Rehabilitation  and  Development  (COMM)

$132,355 COMM_Key

Huntingdon Huntingdon  Borough Uptown  Playground  Improvements

BRC-­‐PRD-­‐11-­‐44

$60,000 $55,000 11 Park  Rehabilitation  and  Development  (COMM)

$120,000 COMM_Key

Huntingdon Huntingdon  Borough William  Smith  School  Property  Acquisition

BRC-­‐ACQ-­‐11.5-­‐7

$80,000 $70,000 11.5 Acquisition  (COMM)

$160,000 COMM_Key

Huntingdon Juniata  Clean  Water  Partnership  

Lower  Trail  Expansion  &  Mapleton  Comm.  Pk.  Feasibility  Study

BRC-­‐RCI-­‐13-­‐5

$31,800 $31,800 13 Implementation  (RIV)

$63,700 RIVER_Key

Huntingdon Mapleton  Borough Community  Park KEY-­‐SC-­‐4-­‐92 $18,982 $19,000 4 Small  Communities/Small  Projects  (COMM)

$27,532 COMM_Key

Huntingdon Marklesburg  Borough

Borough  Park KEY-­‐SC-­‐1-­‐79 $20,000 $20,000 1 Small  Communities/Small  Projects  (COMM)

$21,000 COMM_Key

Page 291: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  291  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Huntingdon Mount  Union  Borough

Borough  Park BRC-­‐SC-­‐8-­‐126

$27,000 $27,000 8 Small  Communities/Small  Projects  (COMM)

$34,000 COMM_Key

Huntingdon Mount  Union  Borough

Riverside  Park BRC-­‐SC-­‐9-­‐143

$40,000 $40,000 9 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Huntingdon The  Conservation  Fund  

Path  Estate  Acquisition

BRC-­‐LTA-­‐8-­‐23

$176,000 $176,000 8 Critical  Habitat  Acquisition  (LT)

$451,000 LT_Key

Huntingdon The  Conservation  Fund  

Suppes  Trust  Property

BRC-­‐LTA-­‐6-­‐7

$533,000 $500,000 6 Critical  Habitat  Acquisition  (LT)

$1,217,000 LT_Key

Huntingdon Three Springs Borough

Borough Park- Development

BRC-SC-19-52

$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)

$60,000.00 COMM_Key

Huntingdon Three Springs Borough

Borough Park- Development

BRC-SC-19-52

$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)

$60,000.00 COMM_Key

Huntingdon Three Springs Borough

Borough Park- Development

BRC-SC-19-52

$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)

$60,000.00 COMM_Key

Huntingdon Three  Springs  Borough

Swimming  Pool  Improvements

KEY-­‐PRD-­‐1-­‐134

$45,000 $45,000 1 Park  Rehabilitation  and  Development  (COMM)

$90,000 COMM_Key

Page 292: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  292  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Huntingdon Walker  Township Township  Park  -­‐  Phase  I

KEY-­‐SC-­‐1-­‐141

$20,000 $20,000 1 Small  Communities/Small  Projects  (COMM)

$40,000 COMM_Key

Huntingdon Wood  Township Township  Park BRC-­‐SC-­‐10-­‐105

$28,900 $29,000 10 Small  Communities/Small  Projects  (COMM)

$37,771 COMM_Key

Indiana Blackleggs  Watershed  Association,  Inc.  

Memorial  Park BRC-­‐RCD-­‐13-­‐6

$66,600 $51,000 13 Development  (RIV)

$133,200 RIVER_Key

Indiana Blairsville  Borough Blairsville  Community  Park

BRC-­‐SC-­‐7-­‐22

$35,400 $17,500 7 Small  Communities/Small  Projects  (COMM)

$50,800 COMM_Key

Indiana Blairsville  Borough Market  Street  Streetscape

BRC-­‐PRD-­‐11.5-­‐17

$242,500 $200,000 11.5 Park  Rehabilitation  and  Development  (COMM)

$1,209,700 COMM_Key

Indiana Blairsville  Borough Recreation  Center KEY-­‐PRD-­‐3-­‐21

$45,000 $45,000 3 Park  Rehabilitation  and  Development  (COMM)

$90,000 COMM_Key

Indiana Brush  Valley  Township

Township  Park KEY-­‐SC-­‐4-­‐21 $19,834 $19,800 4 Small  Communities/Small  Projects  (COMM)

$26,634 COMM_Key

Page 293: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  293  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Indiana Brush  Valley  Township

Township  Park  Development

BRC-­‐SC-­‐12-­‐85

$32,000 $32,000 12 Small  Communities/Small  Projects  (COMM)

$44,000 COMM_Key

Indiana Center  Township FMC  Sports  Complex  Renovation

BRC-­‐PRD-­‐12-­‐293

$84,200 $84,200 12 Park  Rehabilitation  and  Development  (COMM)

$181,500 COMM_Key

Indiana Cherry  Tree  Borough Cherry  Tree  Boat  Launch

BRC-­‐RCD-­‐8-­‐20

$25,000 $25,000 8 Development  (RIV)

$50,100 RIVER_Key

Indiana Cherry Tree Borough Cherry Tree Park - Development

BRC-SC-19-35

$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)

$60,000.00 COMM_Key

Indiana Cherry Tree Borough Cherry Tree Park - Development

BRC-SC-19-35

$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)

$60,000.00 COMM_Key

Indiana Cherry Tree Borough Cherry Tree Park - Development

BRC-SC-19-35

$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)

$60,000.00 COMM_Key

Indiana Conemaugh  Township

Pool  Improvements BRC-­‐PRD-­‐12-­‐141

$100,000 $100,000 12 Park  Rehabilitation  and  Development  (COMM)

$200,000 COMM_Key

Indiana Conemaugh  Township

SCL  Recreation  Park KEY-­‐SC-­‐4-­‐36 $20,000 $20,000 4 Small  Communities/Small  Projects  (COMM)

$32,000 COMM_Key

Page 294: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  294  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Indiana Conemaugh  Township

Swimming  Pool  Feasibility  Study

BRC-­‐TAG-­‐8-­‐49

$8,750 $8,500 8 Feasibility  Studies  (COMM)

$17,500 COMM_Key

Indiana Conemaugh  Valley  Conservancy,  Inc.  

Tunnelton  Area  -­‐  West  Penn  Trail  Acquisition

BRC-­‐RTA-­‐8-­‐3

$148,500 $140,000 8 Acquisition  (RT) $297,000 RT_Key

Indiana Homer City Borough Homer City Boat Lauch Park - Development

BRC-PRD-19-84

$43,051.00 $43,000.00 19 Park Rehabilitation and Development (COMM)

$86,612.00 COMM_Key

Indiana Homer City Borough Homer City Boat Lauch Park - Development

BRC-PRD-19-84

$43,051.00 $43,000.00 19 Park Rehabilitation and Development (COMM)

$86,612.00 COMM_Key

Indiana Homer City Borough Homer City Boat Lauch Park - Development

BRC-PRD-19-84

$43,051.00 $43,000.00 19 Park Rehabilitation and Development (COMM)

$86,612.00 COMM_Key

Indiana Homer  City  Borough Hoodlebug  Trail BRC-­‐PRD-­‐13-­‐373

$130,100 $130,000 13 Park  Rehabilitation  and  Development  (COMM)

$261,700 COMM_Key

Indiana Homer  City  Borough In-­‐Town  Park KEY-­‐SC-­‐3-­‐91 $10,000 $10,000 3 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Indiana Indiana  County Blacklick  Valley  Natural  Area  Acquisition

BRC-­‐ACQ-­‐10-­‐184

$35,700 $35,000 10 Acquisition  (COMM)

$71,300 COMM_Key

Page 295: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  295  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Indiana Indiana  County Blairsville  Secondary  Trail

BRC-­‐RTD-­‐9-­‐14

$100,000 $100,000 9 Rail  Rehabilitation  and  Development  (RT)

$660,000 RT_Key

Indiana Indiana  County Blue  Spruce  County  Park  Expansion

BRC-­‐ACQ-­‐8-­‐87

$91,500 $90,000 8 Acquisition  (COMM)

$183,000 COMM_Key

Indiana Indiana  County County  Regional  Trail  Connectivity  Study

BRC-­‐TAG-­‐13.6-­‐595

$22,500 $22,500 13.6 Trail  Study  (COMM)

$45,000 COMM_Key

Indiana Indiana  County Ghost  Town  Trail KEY-­‐RTD-­‐95-­‐17

$24,500 $24,500 1 Rail  Rehabilitation  and  Development  (RT)

$49,000 RT_Key

Indiana Indiana  County Ghost  Town  Trail  Extension,  Phase  3

BRC-­‐PRD-­‐12-­‐160

$210,000 $222,000 12 Park  Rehabilitation  and  Development  (COMM)

$1,314,000 COMM_Key

Indiana Indiana  County Hoodlebug  Trail  -­‐  SR  3035  Underpass

KEY-­‐RTD-­‐5-­‐26

$104,000 $94,400 5 Rail  Rehabilitation  and  Development  (RT)

$520,000 RT_Key

Indiana Indiana  County Rec,  Prk,  Open  Space,  Greenways  Trails  Plan

BRC-­‐TAG-­‐8-­‐88

$60,000 $100,000 8 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$122,500 COMM_Key

Page 296: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  296  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Indiana Indiana  County  Conservation  District  

Waterworks  Conservation  Area

BRC-­‐RCD-­‐12-­‐7

$100,000 $100,000 12 Development  (RIV)

$411,900 RIVER_Key

Indiana Montgomery  Township

Township  Park KEY-­‐SC-­‐3-­‐144

$19,800 $19,800 3 Small  Communities/Small  Projects  (COMM)

$34,000 COMM_Key

Indiana Plumville  Borough Plumville  Area  Playground

BRC-­‐SC-­‐10-­‐94

$32,200 $30,000 10 Small  Communities/Small  Projects  (COMM)

$44,350 COMM_Key

Indiana Saltsburg  Borough North  Park  and  West  Penn  Trail  Bridge

BRC-­‐PRD-­‐9-­‐8

$200,000 $200,000 9 Park  Rehabilitation  and  Development  (COMM)

$400,000 COMM_Key

Indiana Saltsburg  Borough River's  Edge    Park  -­‐Phase  II

KEY-­‐SC-­‐3-­‐191

$19,700 $19,700 3 Small  Communities/Small  Projects  (COMM)

$21,200 COMM_Key

Indiana Saltsburg  Borough The  Rivers  Edge KEY-­‐SC-­‐2-­‐135

$20,000 $20,000 2 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Indiana Smicksburg  Borough Old  Smicksburg  Park KEY-­‐SC-­‐4-­‐141

$15,500 $15,500 4 Small  Communities/Small  Projects  (COMM)

$18,000 COMM_Key

Page 297: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  297  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Indiana West  Wheatfield  Township

Recreation  Area KEY-­‐SC-­‐4-­‐172

$18,910 $18,900 4 Small  Communities/Small  Projects  (COMM)

$23,910 COMM_Key

Indiana Western  Pennsylvania  Conservancy  

Garfield  Tract  Acquisition

BRC-­‐LTA-­‐13.3-­‐534

$35,650 $12,000 13.3 Open  Space  Acquisition  (LT)

$71,300 LT_Key

Indiana White  Township Getty  Heights  Park BRC-­‐PRD-­‐9-­‐233

$72,400 $72,000 9 Park  Rehabilitation  and  Development  (COMM)

$144,900 COMM_Key

Indiana White  Township Indiana  Ice  Center  Feasibility  Study

BRC-­‐TAG-­‐11.5-­‐37

$40,000 $40,000 11.5 Feasibility  Studies  (COMM)

$80,000 COMM_Key

Indiana White  Township Kennedy-­‐King  Park  -­‐  Phase  I

BRC-­‐PRD-­‐12-­‐56

$72,800 $72,800 12 Park  Rehabilitation  and  Development  (COMM)

$145,600 COMM_Key

Indiana White Township Kennedy-King Park-- Phase 2 - Development

BRC-PRD-19-126

$85,097.50 $85,000.00 19 Park Rehabilitation and Development (COMM)

$170,195.00 COMM_Key

Indiana White Township Kennedy-King Park-- Phase 2 - Development

BRC-PRD-19-126

$85,097.50 $85,000.00 19 Park Rehabilitation and Development (COMM)

$170,195.00 COMM_Key

Page 298: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  298  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Indiana White Township Kennedy-King Park-- Phase 2 - Development

BRC-PRD-19-126

$85,097.50 $85,000.00 19 Park Rehabilitation and Development (COMM)

$170,195.00 COMM_Key

Indiana White  Township Mack  Pool BRC-­‐PRD-­‐13.3-­‐447

$489,800 $675,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$979,600 COMM_Key

Indiana White  Township Peer-­‐to-­‐Peer KEY-­‐TAG-­‐3-­‐2

$7,500 $75,000 3 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$8,250 COMM_Key

Indiana White  Township Recreation  Complex-­‐Phase  II

KEY-­‐PRD-­‐2-­‐176

$199,200 $199,200 2 Park  Rehabilitation  and  Development  (COMM)

$398,400 COMM_Key

Indiana White  Township White  Township  Recreation  Complex

BRC-­‐PRD-­‐6-­‐200

$93,300 $90,000 6 Park  Rehabilitation  and  Development  (COMM)

$186,600 COMM_Key

Indiana Young  Township Township  Park KEY-­‐SC-­‐5-­‐232

$19,015 $19,000 5 Small  Communities/Small  Projects  (COMM)

$24,140 COMM_Key

Indiana Young  Township Young  Township  Park

BRC-­‐SC-­‐6-­‐208

$18,700 $20,000 6 Small  Communities/Small  Projects  (COMM)

$20,700 COMM_Key

Page 299: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  299  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Indiana,  Westmoreland

Conemaugh  Valley  Conservancy,  Inc.  

R&P  Trail BRC-­‐RTD-­‐7-­‐1

$288,954 $320,000 7 Rail  Rehabilitation  and  Development  (RT)

$640,000 RT_Key

Indiana,  Westmoreland

Conemaugh  Valley  Conservancy,  Inc.  

West  Penn  Trail  -­‐  Pedestrian  Bridge

BRC-­‐RTD-­‐14-­‐7

$250,000 $250,000 14 Rail  Rehabilitation  and  Development  (RT)

$500,000 RT_Key

Jefferson Brockway  Borough Brockway  Trail  Connections

BRC-­‐TAG-­‐10-­‐148

$8,000 $8,000 10 Trail  Study  (COMM)

$16,000 COMM_Key

Jefferson Brockway  Borough Kids  Kingdom  Park KEY-­‐SC-­‐3-­‐24 $20,000 $20,000 3 Small  Communities/Small  Projects  (COMM)

$21,800 COMM_Key

Jefferson Brockway  Borough Taylor  Memorial  Park

BRC-­‐SC-­‐7-­‐26

$39,000 $39,000 7 Small  Communities/Small  Projects  (COMM)

$58,000 COMM_Key

Jefferson Brockway  Borough Taylor  Memorial  Park

KEY-­‐SC-­‐1-­‐20 $20,000 $20,000 1 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Jefferson Brockway  Borough Taylor  Memorial  Park  -­‐  Bandshell

BRC-­‐PRD-­‐11-­‐12

$100,300 $100,300 11 Park  Rehabilitation  and  Development  (COMM)

$200,700 COMM_Key

Page 300: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  300  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Jefferson Brockway  Borough Taylor  Memorial  Park  Master  Site  Plan  &  Pool  Feas.  Study

BRC-­‐TAG-­‐13.3-­‐460

$12,500 $12,500 13.3 Master  Site  Plans  (COMM)

$25,000 COMM_Key

Jefferson Brockway  Borough Taylor  Memorial  Park  Pool

KEY-­‐PRD-­‐2-­‐19

$32,000 $32,000 2 Park  Rehabilitation  and  Development  (COMM)

$64,000 COMM_Key

Jefferson Brockway  Borough Taylor  Memorial  Park-­‐  Development

BRC-­‐PRD-­‐16-­‐124

$139,000 $139,000 16 Park  Rehabilitation  and  Development  (COMM)

$278,000 COMM_Key

Jefferson Brookville  Borough Brookville  Skatepark  Study

BRC-­‐TAG-­‐12-­‐226

$4,000 $4,000 12 Feasibility  Studies  (COMM)

$8,000 COMM_Key

Jefferson Brookville  Borough Dr.  Walter  Dick  Memorial  Park

KEY-­‐PRD-­‐3-­‐25

$26,200 $26,000 3 Park  Rehabilitation  and  Development  (COMM)

$52,400 COMM_Key

Jefferson Brookville  Borough Walter  Dick,  Longview,  &  Memorial  Parks

KEY-­‐SC-­‐2-­‐20 $20,000 $20,000 2 Small  Communities/Small  Projects  (COMM)

$39,000 COMM_Key

Jefferson Falls  Creek  Borough Falls  Creek  Park BRC-­‐SC-­‐10-­‐78

$10,000 $20,000 10 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Page 301: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  301  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Jefferson Falls  Creek  Borough Falls  Creek  Park BRC-­‐SC-­‐9-­‐74

$40,000 $30,000 9 Small  Communities/Small  Projects  (COMM)

$63,700 COMM_Key

Jefferson Headwaters  Charitable  Trust  

Line  651  Rail-­‐TrailNow  named  "Wolf  Creek  Trail".

KEY-­‐RTD-­‐4-­‐12

$5,000 $5,000 4 Rail  Rehabilitation  and  Development  (RT)

$10,000 RT_Key

Jefferson Jefferson  County Circuit  Rider BRC-­‐TAG-­‐6-­‐8

$28,500 $60,275 6 Circuit  Rider  (COMM)

$75,800 COMM_Key

Jefferson Jefferson  County Cloe  Lake  Recreational  Development  Study

BRC-­‐TAG-­‐8-­‐94

$12,500 $12,500 8 Master  Site  Plans  (COMM)

$25,000 COMM_Key

Jefferson Jefferson  County Mahoning  Creek  Watershed  Cons.  Plan

KEY-­‐RCP-­‐95-­‐13

$20,300 $20,300 1 Planning  (RIV) $40,600 RIVER_Key

Jefferson Jefferson  County Mahoning  Shadow  Trail

BRC-­‐PRD-­‐9-­‐101

$65,000 $65,000 9 Park  Rehabilitation  and  Development  (COMM)

$387,000 COMM_Key

Jefferson Jefferson  County Mahoning  Shadow  Trail

BRC-­‐RTD-­‐6-­‐13

$25,000 $50,000 6 Rail  Rehabilitation  and  Development  (RT)

$50,000 RT_Key

Jefferson Jefferson  County Mahoning  Shadow  Trail

KEY-­‐ACQ-­‐2-­‐69

$47,500 $47,500 2 Acquisition  (COMM)

$95,000 COMM_Key

Page 302: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  302  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Jefferson Jefferson  County Peer-­‐to-­‐Peer KEY-­‐TAG-­‐4-­‐3

$7,500 $7,500 4 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$8,250 COMM_Key

Jefferson McCalmont  Township

Anita  Park BRC-­‐SC-­‐7-­‐123

$17,889 $20,000 7 Small  Communities/Small  Projects  (COMM)

$26,289 COMM_Key

Jefferson Perry  Township Fordham  Trail  Head BRC-­‐SC-­‐13.3-­‐316

$20,000 $20,000 13.3 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Jefferson Punxsutawney  Borough

Community  Pool BRC-­‐PRD-­‐12-­‐191

$50,000 $50,000 12 Park  Rehabilitation  and  Development  (COMM)

$100,000 COMM_Key

Jefferson Punxsutawney  Borough

George  C.  Brown  Pool  Feasibility  Study

BRC-­‐TAG-­‐9-­‐172

$10,000 $10,000 9 Feasibility  Studies  (COMM)

$20,000 COMM_Key

Jefferson Punxsutawney  Borough

Groundhog  Zoo BRC-­‐PRD-­‐13.3-­‐416

$13,800 $13,800 13.3 Park  Rehabilitation  and  Development  (COMM)

$27,600 COMM_Key

Jefferson Punxsutawney  Borough

Peer-­‐to-­‐Peer BRC-­‐TAG-­‐9-­‐4

$7,500 $7,500 9 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$8,250 COMM_Key

Page 303: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  303  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Jefferson Punxsutawney  Borough

Punxsutawney  Borough  Recreational  Area

BRC-­‐PRD-­‐8-­‐159

$148,500 $148,000 8 Park  Rehabilitation  and  Development  (COMM)

$298,700 COMM_Key

Jefferson Punxsutawney  Borough

Recreation  Center  Renovation

BRC-­‐PRD-­‐7-­‐160

$233,000 $150,000 7 Park  Rehabilitation  and  Development  (COMM)

$466,000 COMM_Key

Jefferson Punxsutawney  Borough

River  Walk BRC-­‐RCD-­‐7-­‐15

$35,000 $35,000 7 Development  (RIV)

$70,000 RIVER_Key

Jefferson Reynoldsville Borough Community Park- Development

BRC-SC-19-49

$38,690.00 $40,000.00 19 Small Communities/Small Projects (COMM)

$57,380.00 COMM_Key

Jefferson Reynoldsville Borough Community Park- Development

BRC-SC-19-49

$38,690.00 $40,000.00 19 Small Communities/Small Projects (COMM)

$57,380.00 COMM_Key

Jefferson Reynoldsville Borough Community Park- Development

BRC-SC-19-49

$38,690.00 $40,000.00 19 Small Communities/Small Projects (COMM)

$57,380.00 COMM_Key

Jefferson Reynoldsville  Borough

Reynoldsville  Pool  Rehabilitation

BRC-­‐SC-­‐12-­‐290

$25,000 $25,000 12 Small  Communities/Small  Projects  (COMM)

$30,000 COMM_Key

Jefferson Reynoldsville  Borough

Reynoldsville  Recreation  Complex

KEY-­‐SC-­‐3-­‐184

$20,000 $20,000 3 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Page 304: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  304  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Jefferson Sykesville  Borough Highland  Street  Park BRC-­‐SC-­‐7-­‐186

$19,086 $20,000 7 Small  Communities/Small  Projects  (COMM)

$23,246 COMM_Key

Jefferson Sykesville  Borough Stahl  Community  Park-­‐  Development

BRC-­‐SC-­‐16-­‐48

$40,000 $40,000 16 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Jefferson Sykesville  Borough Stahl  Park BRC-­‐SC-­‐10-­‐100

$20,000 $24,000 10 Small  Communities/Small  Projects  (COMM)

$28,200 COMM_Key

Jefferson Washington  Township

Wolf  Creek  Park  Development

BRC-­‐SC-­‐11-­‐163

$20,000 $20,000 11 Small  Communities/Small  Projects  (COMM)

$33,600 COMM_Key

Jefferson Young  Township Adrian  Park KEY-­‐SC-­‐4-­‐180

$20,000 $20,000 4 Small  Communities/Small  Projects  (COMM)

$22,200 COMM_Key

Juniata Fayette  Township Lost  Creek  Community  Park

BRC-­‐PRD-­‐14-­‐140

$200,400 $150,000 14 Park  Rehabilitation  and  Development  (COMM)

$400,800 COMM_Key

Juniata Fayette  Township Lost  Creek  Community  Park  Plan

BRC-­‐TAG-­‐11.5-­‐22

$15,000 $15,000 11.5 Master  Site  Plans  (COMM)

$30,000 COMM_Key

Juniata Fayette  Township Sieber  Property  Acquisition

BRC-­‐ACQ-­‐13.6-­‐580

$299,260 $299,000 13.6 Acquisition  (COMM)

$611,260 COMM_Key

Page 305: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  305  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Juniata Fermanagh  Township

Recreation  Park  Acquisition

BRC-­‐ACQ-­‐11-­‐176

$51,600 $50,000 11 Acquisition  (COMM)

$103,200 COMM_Key

Juniata Juniata  County Juniata/Mifflin  Greenway  &  Rural  Recreation  Plan

BRC-­‐TAG-­‐12-­‐239

$95,500 $75,000 12 Greenway  Plans  (COMM)

$191,000 COMM_Key

Juniata Mifflintown  Borough Myers  Park BRC-­‐SC-­‐6-­‐112

$20,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$24,731 COMM_Key

Juniata Walker  Township Park  Acquisition BRC-­‐ACQ-­‐8-­‐206

$168,000 $165,000 8 Acquisition  (COMM)

$336,000 COMM_Key

Juniata Walker  Township Walker  Township  Park

BRC-­‐PRD-­‐9-­‐218

$139,300 $130,000 9 Park  Rehabilitation  and  Development  (COMM)

$278,600 COMM_Key

Lackawanna Archbald  Borough Archbald  Regional  Park

BRC-­‐PRD-­‐7-­‐12

$250,000 $250,000 7 Park  Rehabilitation  and  Development  (COMM)

$500,000 COMM_Key

Lackawanna Archbald  Borough Laurel  Street  Park KEY-­‐PRD-­‐2-­‐3

$21,000 $21,000 2 Park  Rehabilitation  and  Development  (COMM)

$42,000 COMM_Key

Lackawanna Blakely  Borough Sen.  Robert  Mellow  Recreation  Complex

KEY-­‐PRD-­‐4-­‐16

$160,000 $100,000 4 Park  Rehabilitation  and  Development  (COMM)

$320,000 COMM_Key

Page 306: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  306  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lackawanna Blakely  Borough Swansee  Recreation  Area  Expansion

KEY-­‐ACQ-­‐2-­‐14

$42,000 $42,000 2 Acquisition  (COMM)

$88,000 COMM_Key

Lackawanna Clarks  Green  Borough

Abington  Area  Community  Park-­‐Development

BRC-­‐PRD-­‐15-­‐55

$61,250 $61,000 15 Park  Rehabilitation  and  Development  (COMM)

$122,500 COMM_Key

Lackawanna Clarks  Summit  Borough

Abington  Area  Community  Park  Master  Site  Dev.  Plan

BRC-­‐TAG-­‐11-­‐197

$40,000 $40,000 11 Master  Site  Plans  (COMM)

$80,000 COMM_Key

Lackawanna Clifton  Township Clifton  Acres  Acquisition

BRC-­‐ACQ-­‐17-­‐89

$78,697 $77,600 17 Acquisition  (COMM)

$161,394 COMM_Key

Lackawanna Countryside  Conservancy  

Ackerly  Creek  Greenway  Assessment

KEY-­‐RCI-­‐5-­‐9 $32,700 $33,000 5 Implementation  (RIV)

$82,150 RIVER_Key

Lackawanna Countryside  Conservancy  

Countryside  Conservancy  Rail  Trail  Feas.  Plan

BRC-­‐RTP-­‐8-­‐4

$20,000 $20,000 8 Feasibility  Studies  (RT)

$40,000 RT_Key

Lackawanna Countryside  Conservancy  

Tunkhannock  Creek  Watershed  Greenway

BRC-­‐LTA-­‐7-­‐5

$250,000 $250,000 7 Open  Space  Acquisition  (LT)

$1,267,600 LT_Key

Lackawanna Covington  Township Municipal  Park KEY-­‐ACQ-­‐5-­‐40

$39,800 $34,500 5 Acquisition  (COMM)

$79,667 COMM_Key

Lackawanna Dalton  Borough Dalton  Streamside  Master  Plan

BRC-­‐TAG-­‐6-­‐48

$13,250 $13,200 6 Master  Site  Plans  (COMM)

$26,500 COMM_Key

Lackawanna Dalton  Borough Dalton  Streamside  Park

BRC-­‐SC-­‐7-­‐47

$40,000 $40,000 7 Small  Communities/Small  Projects  (COMM)

$60,058 COMM_Key

Page 307: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  307  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lackawanna Dalton  Borough Streamside  and  Platt  Parks-­‐  Rehab.&  Development

BRC-­‐SC-­‐15-­‐77

$39,000 $39,000 15 Small  Communities/Small  Projects  (COMM)

$58,000 COMM_Key

Lackawanna Jefferson Township Ritter Land Acquisition BRC-ACQ-19-10

$145,010.00 $141,200.00 19 Acquisition (COMM)

$290,020.00 COMM_Key

Lackawanna Jefferson Township Ritter Land Acquisition BRC-ACQ-19-10

$145,010.00 $141,200.00 19 Acquisition (COMM)

$290,020.00 COMM_Key

Lackawanna Jefferson Township Ritter Land Acquisition BRC-ACQ-19-10

$145,010.00 $141,200.00 19 Acquisition (COMM)

$290,020.00 COMM_Key

Lackawanna Jefferson Township Township Park Master Site Plan

BRC-TAG-19-133

$30,000.00 $30,000.00 19 Master Site Plans (COMM)

$60,000.00 COMM_Key

Lackawanna Jefferson Township Township Park Master Site Plan

BRC-TAG-19-133

$30,000.00 $30,000.00 19 Master Site Plans (COMM)

$60,000.00 COMM_Key

Lackawanna Jefferson Township Township Park Master Site Plan

BRC-TAG-19-133

$30,000.00 $30,000.00 19 Master Site Plans (COMM)

$60,000.00 COMM_Key

Lackawanna Jessup  Borough Sports  Complex KEY-­‐PRD-­‐4-­‐73

$35,000 $35,000 4 Park  Rehabilitation  and  Development  (COMM)

$75,000 COMM_Key

Lackawanna Lackawanna  County Aylesworth  Park  -­‐  Development

BRC-­‐PRD-­‐13-­‐379

$100,000 $100,000 13 Park  Rehabilitation  and  Development  (COMM)

$225,000 COMM_Key

Lackawanna Lackawanna  County Aylesworth  Park  Master  Site  Development  Plan

BRC-­‐TAG-­‐13-­‐189

$20,000 $20,000 13 Master  Site  Plans  (COMM)

$40,000 COMM_Key

Lackawanna Lackawanna  County Covington  Park  Master  Site  Plan

KEY-­‐TAG-­‐4-­‐76

$30,000 $30,000 4 Master  Site  Plans  (COMM)

$60,000 COMM_Key

Page 308: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  308  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lackawanna Lackawanna  County Merli-­‐Sarnoski  Park  Master  Site  Plan

BRC-­‐TAG-­‐11-­‐215

$20,000 $20,000 11 Master  Site  Plans  (COMM)

$40,000 COMM_Key

Lackawanna Lackawanna  County Two  Sites KEY-­‐PRD-­‐4-­‐77

$150,000 $100,000 4 Park  Rehabilitation  and  Development  (COMM)

$420,000 COMM_Key

Lackawanna Lackawanna  Heritage  Valley  Authority  

Lackawanna  River  Heritage  Trail

KEY-­‐PRD-­‐3-­‐102

$200,000 $200,000 3 Park  Rehabilitation  and  Development  (COMM)

$755,000 COMM_Key

Lackawanna Lackawanna  Heritage  Valley  Authority  

Lackawanna  River  Heritage  Trail  -­‐  Carbondale  Riverwalk  -­‐  Development

BRC-­‐PRD-­‐18-­‐78

$905,346 $392,500 18 Park  Rehabilitation  and  Development  (COMM)

$1,810,693 COMM_Key

Lackawanna Lackawanna  Heritage  Valley  Authority  

Lackawanna  River  Heritage  Trail  –  Carbondale  &  Fell  Acquisitions

BRC-­‐ACQ-­‐18-­‐6

$40,000 $40,000 18 Acquisition  (COMM)

$80,000 COMM_Key

Lackawanna Lackawanna Heritage Valley Authority

Lackawanna River Heritage Trail – Fell Township Section – Development

BRC-PRD-19-88

$798,778.00 $500,000.00 19 Park Rehabilitation and Development (COMM)

$998,472.50 COMM_Key

Lackawanna Lackawanna Heritage Valley Authority

Lackawanna River Heritage Trail – Fell Township Section – Development

BRC-PRD-19-88

$798,778.00 $500,000.00 19 Park Rehabilitation and Development (COMM)

$998,472.50 COMM_Key

Page 309: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  309  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lackawanna Lackawanna Heritage Valley Authority

Lackawanna River Heritage Trail – Fell Township Section – Development

BRC-PRD-19-88

$798,778.00 $500,000.00 19 Park Rehabilitation and Development (COMM)

$998,472.50 COMM_Key

Lackawanna Lackawanna Heritage Valley Authority

Lackawanna River Heritage Trail – Taylor & Mayfield Acquisitions

BRC-RTA-19-160

$90,290.00 $90,200.00 19 Acquisition (RT)

$180,580.00 COMM_Key

Lackawanna Lackawanna Heritage Valley Authority

Lackawanna River Heritage Trail – Taylor & Mayfield Acquisitions

BRC-RTA-19-160

$90,290.00 $90,200.00 19 Acquisition (RT)

$180,580.00 COMM_Key

Lackawanna Lackawanna Heritage Valley Authority

Lackawanna River Heritage Trail – Taylor & Mayfield Acquisitions

BRC-RTA-19-160

$90,290.00 $90,200.00 19 Acquisition (RT)

$180,580.00 COMM_Key

Lackawanna Lackawanna Heritage Valley Authority

Lackawanna River Heritage Trail – Taylor & Mayfield Acquisitions

BRC-RTA-19-160

$90,290.00 $90,200.00 19 Acquisition (RT)

$180,580.00 COMM_Key

Lackawanna Lackawanna  Heritage  Valley  Authority  

Lackawanna  River  Heritage  Trail  Design  Only  -­‐  Planning

BRC-­‐TAG-­‐17-­‐10

$75,000 $75,000 17 Trail  Study  (COMM)

$150,000 COMM_Key

Lackawanna Lackawanna  Heritage  Valley  Authority  

Peer-­‐to-­‐Peer KEY-­‐TAG-­‐1-­‐68

$7,500 $7,500 1 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$8,250 COMM_Key

Lackawanna Lackawanna  River  Corridor  Association  

Lackawanna  River  Corridor  Plan

KEY-­‐RCP-­‐5-­‐10

$24,000 $24,000 5 Planning  (RIV) $48,300 RIVER_Key

Lackawanna Lackawanna  Valley  Conservancy  

Providence  Reach  Acquisition

BRC-­‐RTA-­‐12-­‐2

$50,000 $45,000 12 Acquisition  (RT) $114,100 RT_Key

Page 310: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  310  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lackawanna Mayfield  Borough Community  Park BRC-­‐SC-­‐14-­‐97

$25,000 $25,000 14 Small  Communities/Small  Projects  (COMM)

$30,000 COMM_Key

Lackawanna Newton  Township Newton  Recreation  Center

KEY-­‐PRD-­‐5-­‐147

$33,000 $33,000 5 Park  Rehabilitation  and  Development  (COMM)

$66,000 COMM_Key

Lackawanna Newton  Township Newton  Recreation  Center  Park

BRC-­‐PRD-­‐8-­‐133

$92,100 $90,000 8 Park  Rehabilitation  and  Development  (COMM)

$184,300 COMM_Key

Lackawanna Olyphant  Borough Fern  Hill  Park BRC-­‐PRD-­‐6-­‐134

$100,000 $100,000 6 Park  Rehabilitation  and  Development  (COMM)

$220,801 COMM_Key

Lackawanna Olyphant  Borough Philip  Condella  Athletic  Complex

BRC-­‐PRD-­‐13.3-­‐409

$100,000 $100,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$201,700 COMM_Key

Lackawanna Olyphant  Borough Phillip  Condella  Athletic  Complex  -­‐  Development

BRC-­‐PRD-­‐17-­‐145

$100,000 $100,000 17 Park  Rehabilitation  and  Development  (COMM)

$220,573 COMM_Key

Page 311: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  311  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lackawanna Olyphant  Borough Recreation  Center-­‐Phillip  Condella  Athl.  Complex

BRC-­‐PRD-­‐10-­‐131

$200,000 $150,000 10 Park  Rehabilitation  and  Development  (COMM)

$1,472,400 COMM_Key

Lackawanna Ransom  Township Recreational  Area  Master  Site  Plan

BRC-­‐TAG-­‐16-­‐71

$42,500 $42,500 16 Master  Site  Plans  (COMM)

$85,000 COMM_Key

Lackawanna Scott  Township Justus  Field KEY-­‐PRD-­‐5-­‐178

$21,707 $21,700 5 Park  Rehabilitation  and  Development  (COMM)

$43,413 COMM_Key

Lackawanna Scranton  City 500  Lackawanna  Avenue  Park  Plaza

BRC-­‐PRD-­‐14-­‐372

$1,000,000 $500,000 14 Park  Rehabilitation  and  Development  (COMM)

$3,000,000 COMM_Key

Lackawanna Scranton  City Comp.  Recreation,  Park  &  Open  Space  Plan

KEY-­‐TAG-­‐5-­‐179

$40,000 $40,000 5 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$80,000 COMM_Key

Lackawanna South  Abington  Township

South  Abington  Community  Park

BRC-­‐PRD-­‐13-­‐144

$29,800 $29,800 13 Park  Rehabilitation  and  Development  (COMM)

$59,600 COMM_Key

Lackawanna The  Nature  Conservancy  

Moosic  Mountain  -­‐  SLIBCO

BRC-­‐LTA-­‐6-­‐21

$1,133,000 $1,100,000 6 Critical  Habitat  Acquisition  (LT)

$2,266,000 LT_Key

Page 312: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  312  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lackawanna The  Nature  Conservancy  

Moosic  Mountain  Barrens  Acquisition  -­‐  (Phase  1)

BRC-­‐LTA-­‐14-­‐46

$2,218,800 $811,000 14 Critical  Habitat  Acquisition  (LT)

$4,437,500 LT_Key

Lackawanna Thornhurst  Township

Thornhurst  Township  Park  Acquisition

BRC-­‐ACQ-­‐11.5-­‐14

$31,400 $31,400 11.5 Acquisition  (COMM)

$62,800 COMM_Key

Lackawanna Thornhurst  Township

Thornhurst  Township  Park  Master  Site  Plan

BRC-­‐TAG-­‐14-­‐246

$17,500 $17,500 14 Master  Site  Plans  (COMM)

$35,000 COMM_Key

Lackawanna Throop  Borough Washington  Street  Park

KEY-­‐PRD-­‐3-­‐218

$100,000 $100,000 3 Park  Rehabilitation  and  Development  (COMM)

$216,000 COMM_Key

Lackawanna Vandling  Borough Borough  Park KEY-­‐SC-­‐4-­‐158

$20,000 $20,000 4 Small  Communities/Small  Projects  (COMM)

$24,000 COMM_Key

Lackawanna Waverly  Township Recreation  Park-­‐Development

BRC-­‐SC-­‐15-­‐74

$40,000 $40,000 15 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Lackawanna,  Luzerne

Luzerne  County Luzerne/Lackawanna  Bi-­‐County  Comp.  Plan

BRC-­‐TAG-­‐13-­‐192

$15,000 $15,000 13 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$30,000 COMM_Key

Lackawanna,  Luzerne

The  Conservation  Fund  

Theta  Lands  Acquisition  (Watres  Tract)

BRC-­‐LTA-­‐10-­‐2

$1,919,000 $1,026,000 10 Open  Space  Acquisition  (LT)

$3,838,000 LT_Key

Page 313: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  313  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lackawanna,  Luzerne

Wildlands  Conservancy,  Inc.  

Blue  Ridge  Acquisition

BRC-­‐LTA-­‐13-­‐27

$2,575,000 $1,500,000 13 Critical  Habitat  Acquisition  (LT)

$5,150,000 LT_Key

Lackawanna,  Wayne

Wildlands  Conservancy,  Inc.  

Panther  Bluffs  Conservation  Easement

BRC-­‐LTA-­‐7-­‐25

$500,000 $500,000 7 Critical  Habitat  Acquisition  (LT)

$1,401,000 LT_Key

Lancaster Akron  Borough Colonial  Park  Acquisition

BRC-­‐ACQ-­‐11-­‐168

$95,000 $95,000 11 Acquisition  (COMM)

$190,000 COMM_Key

Lancaster Akron  Borough Northern  Lancaster  Reading  &  Columbia  Rail-­‐Trail

BRC-­‐RTP-­‐9-­‐1

$40,000 $40,000 9 Feasibility  Studies  (RT)

$80,000 RT_Key

Lancaster Akron  Borough Warwick  to  Ephrata  Rail  Trail  -­‐  Akron  East

BRC-­‐PRD-­‐16-­‐117

$188,400 $188,400 16 Park  Rehabilitation  and  Development  (COMM)

$376,800 COMM_Key

Lancaster Akron  Borough Warwick  to  Ephrata  Rail-­‐Trail  -­‐  Akron  West  -­‐  Development

BRC-­‐RTD-­‐18-­‐168

$139,202 $139,200 18 Rail  Rehabilitation  and  Development  (RT)

$278,404 COMM_Key

Lancaster Caernarvon  Township

Poole  Forge  Park  Acquisition

BRC-­‐ACQ-­‐11-­‐170

$182,300 $110,000 11 Acquisition  (COMM)

$364,500 COMM_Key

Lancaster Clay Township Snyder Park- Development

BRC-PRD-19-69

$150,000.00 $150,000.00 19 Park Rehabilitation and Development (COMM)

$304,000.00 COMM_Key

Page 314: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  314  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lancaster Clay Township Snyder Park- Development

BRC-PRD-19-69

$150,000.00 $150,000.00 19 Park Rehabilitation and Development (COMM)

$304,000.00 COMM_Key

Lancaster Clay Township Snyder Park- Development

BRC-PRD-19-69

$150,000.00 $150,000.00 19 Park Rehabilitation and Development (COMM)

$304,000.00 COMM_Key

Lancaster Clay  Township Synder  Park  Expansion

BRC-­‐ACQ-­‐10-­‐176

$166,100 $110,000 10 Acquisition  (COMM)

$332,300 COMM_Key

Lancaster Columbia  Borough Feasibility  Study KEY-­‐RTP-­‐3-­‐5 $13,300 $13,300 3 Feasibility  Studies  (RT)

$26,600 RT_Key

Lancaster Columbia  Borough Makle  Park  Rehabilitation  Project

BRC-­‐PRD-­‐10-­‐112

$109,000 $109,000 10 Park  Rehabilitation  and  Development  (COMM)

$217,900 COMM_Key

Lancaster Columbia  Borough Riverfront  and  Rotary  Parks  -­‐  Development

BRC-­‐PRD-­‐17-­‐113

$640,700 $750,000 17 Park  Rehabilitation  and  Development  (COMM)

$1,281,400 COMM_Key

Lancaster Columbia  Borough Riverfront  Park-­‐  Phase  I

BRC-­‐PRD-­‐13-­‐98

$425,000 $650,000 13 Park  Rehabilitation  and  Development  (COMM)

$2,060,000 COMM_Key

Page 315: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  315  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lancaster Columbia  Borough TreeVitalize  Columbia

BRC-­‐TV-­‐14-­‐1

$15,000 $15,000 14 Park  Rehabilitation  and  Development  (COMM)

$30,000 COMM_Key

Lancaster Conestoga  Township Mini  Comp.  Rec.  Park  &  Open  Space  Plan

BRC-­‐TAG-­‐8-­‐51

$12,500 $12,500 8 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$25,000 COMM_Key

Lancaster Conestoga  Township Swimming  Pool KEY-­‐PRD-­‐1-­‐33

$123,722 $120,000 1 Park  Rehabilitation  and  Development  (COMM)

$247,445 COMM_Key

Lancaster Conoy  Township Burkett  Riverfront  Property  Acquisition

BRC-­‐RCA-­‐13-­‐507

$55,500 $55,000 13 Acquisition  (RIV)

$110,900 RIVER_Key

Lancaster Conoy  Township Northwest  Lancaster  County  River  Trail  -­‐  Bainbridge  Riverfront  -­‐  Development

BRC-­‐PRD-­‐18-­‐60

$62,480 $162,400 18 Park  Rehabilitation  and  Development  (COMM)

$124,960 COMM_Key

Lancaster Conoy  Township NW  Lancaster  County  River  Trail

BRC-­‐TAG-­‐7-­‐44

$25,000 $25,000 7 Greenway  Plans  (COMM)

$50,000 COMM_Key

Lancaster Denver  Borough Bon  View  Estates  Linear  Park

BRC-­‐PRD-­‐9-­‐61

$56,868 $16,868 9 Park  Rehabilitation  and  Development  (COMM)

$113,736 COMM_Key

Page 316: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  316  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lancaster Denver  Borough Denver  Memorial  Park

BRC-­‐SC-­‐7-­‐49

$40,000 $40,000 7 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Lancaster Denver  Borough Getz  Land  Acquisition

BRC-­‐ACQ-­‐15-­‐43

$68,000 $68,000 15 Acquisition  (COMM)

$136,000 COMM_Key

Lancaster Denver  Borough Memorial  Park  Addition

KEY-­‐ACQ-­‐5-­‐44

$30,600 $28,000 5 Acquisition  (COMM)

$61,200 COMM_Key

Lancaster Denver  Borough Memorial  Park  Annex

BRC-­‐PRD-­‐14-­‐313

$72,000 $72,000 14 Park  Rehabilitation  and  Development  (COMM)

$144,000 COMM_Key

Lancaster Denver Borough North 4th Street Park- Development

BRC-SC-19-37

$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)

$60,000.00 COMM_Key

Lancaster Denver Borough North 4th Street Park- Development

BRC-SC-19-37

$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)

$60,000.00 COMM_Key

Lancaster Denver Borough North 4th Street Park- Development

BRC-SC-19-37

$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)

$60,000.00 COMM_Key

Lancaster Denver  Borough Open  Space  Plan BRC-­‐TAG-­‐6-­‐51

$10,000 $10,000 6 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$20,000 COMM_Key

Lancaster Donegal  Chapter  of  Trout  Unlimited  

Lititz  Run  Restoration

BRC-­‐RCD-­‐6-­‐15

$25,000 $25,000 6 Development  (RIV)

$50,000 RIVER_Key

Page 317: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  317  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lancaster Donegal  Chapter  of  Trout  Unlimited  

Lititz  Run  Watershed  Plan

KEY-­‐RCP-­‐96-­‐10

$25,000 $25,000 3 Planning  (RIV) $50,000 RIVER_Key

Lancaster East  Donegal  Township

Bridle  Park-­‐  Phase  I BRC-­‐PRD-­‐13.3-­‐352

$118,000 $117,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$235,000 COMM_Key

Lancaster East  Donegal  Township

Joint  Donegal  Area  Recreation  Director  Study

BRC-­‐TAG-­‐7-­‐56

$7,500 $7,500 7 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$8,250 COMM_Key

Lancaster East  Donegal  Township

Kreider  Property KEY-­‐ACQ-­‐4-­‐47

$265,000 $100,000 4 Acquisition  (COMM)

$530,000 COMM_Key

Lancaster East  Donegal  Township

Kreider  Tract BRC-­‐TAG-­‐9-­‐67

$25,000 $25,000 9 Master  Site  Plans  (COMM)

$50,000 COMM_Key

Lancaster East  Donegal  Township

Northwest  Lancaster  County  River  Trail

BRC-­‐PRD-­‐13-­‐102

$754,800 $300,000 13 Park  Rehabilitation  and  Development  (COMM)

$1,147,200 COMM_Key

Lancaster East  Donegal  Township

Riverfront  Park  Environ.  Ed.  Ctr.  FS  &  Marietta  Trail  Study

BRC-­‐TAG-­‐14-­‐200

$28,000 $28,000 14 Feasibility  Studies  (COMM)

$56,000 COMM_Key

Lancaster East  Donegal  Township

Riverfront  Park-­‐  Development

BRC-­‐PRD-­‐16-­‐128

$90,000 $90,000 16 Park  Rehabilitation  and  Development  (COMM)

$180,000 COMM_Key

Page 318: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  318  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lancaster East  Donegal  Township

Susquehanna  River  Park

KEY-­‐ACQ-­‐1-­‐42

$25,413 $25,000 1 Acquisition  (COMM)

$50,826 COMM_Key

Lancaster East  Donegal  Township

Swimming  Pool  Feasibility  Study

KEY-­‐TAG-­‐4-­‐46

$17,150 $17,100 4 Feasibility  Studies  (COMM)

$34,300 COMM_Key

Lancaster East  Donegal  Township

The  Orchards/Melhorn  Park

BRC-­‐PRD-­‐6-­‐56

$23,000 $23,000 6 Park  Rehabilitation  and  Development  (COMM)

$46,286 COMM_Key

Lancaster East  Earl  Township Elanco  Region  Comp.  Rec,  Park  &  Open  Space  Plan

BRC-­‐TAG-­‐8-­‐59

$30,000 $30,000 8 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$60,000 COMM_Key

Lancaster East  Lampeter  Township

Flory  Park  -­‐  Phase  I KEY-­‐PRD-­‐3-­‐53

$118,500 $100,000 3 Park  Rehabilitation  and  Development  (COMM)

$268,500 COMM_Key

Lancaster Elizabeth  Township Elizabeth  Township  Park  -­‐  Phase  I

BRC-­‐PRD-­‐13-­‐357

$200,000 $200,000 13 Park  Rehabilitation  and  Development  (COMM)

$556,100 COMM_Key

Lancaster Elizabeth  Township Miller  Property  Acquisition

BRC-­‐ACQ-­‐11-­‐175

$126,500 $126,000 11 Acquisition  (COMM)

$252,900 COMM_Key

Lancaster Elizabethtown  Borough

Elizabethtown  Community  Park-­‐Development

BRC-­‐PRD-­‐18-­‐69

$249,646 $250,000 18 Park  Rehabilitation  and  Development  (COMM)

$499,292 COMM_Key

Page 319: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  319  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lancaster Elizabethtown  Borough

Willowood  Park KEY-­‐ACQ-­‐3-­‐58

$57,500 $50,000 3 Acquisition  (COMM)

$115,000 COMM_Key

Lancaster Elizabethtown  Borough

Willowood  Park  Master  Plan

KEY-­‐TAG-­‐4-­‐54

$11,400 $11,400 4 Master  Site  Plans  (COMM)

$22,800 COMM_Key

Lancaster Ephrata  Township Community  Park  -­‐  Phase  I

BRC-­‐PRD-­‐10-­‐181

$67,525 $67,000 10 Park  Rehabilitation  and  Development  (COMM)

$135,050 COMM_Key

Lancaster Ephrata  Township Sand  Mine  Comm.  Park  Acq.

BRC-­‐ACQ-­‐8-­‐64

$265,000 $200,000 8 Acquisition  (COMM)

$530,000 COMM_Key

Lancaster Lampeter-­‐Strasburg  Recreation  Commission  

Circuit  Rider  -­‐  Year  2 KEY-­‐TAG-­‐3-­‐104

$27,500 $27,500 3 Circuit  Rider  (COMM)

$36,700 COMM_Key

Lancaster Lampeter-­‐Strasburg  Recreation  Commission  

Circuit  Rider  -­‐  Year  3 KEY-­‐TAG-­‐4-­‐78

$18,900 $18,900 4 Circuit  Rider  (COMM)

$37,800 COMM_Key

Lancaster Lampeter-­‐Strasburg  Recreation  Commission  

Circuit  Rider  (Year  1) KEY-­‐TAG-­‐2-­‐73

$35,000 $35,000 2 Circuit  Rider  (COMM)

$35,000 COMM_Key

Lancaster Lampeter-­‐Strasburg  Recreation  Commission  

Lampeter-­‐Strasburg  Region  Recreation  Center

BRC-­‐TAG-­‐7-­‐97

$17,500 $17,500 7 Feasibility  Studies  (COMM)

$35,000 COMM_Key

Lancaster Lancaster  City 6th  Ward  Park BRC-­‐PRD-­‐14-­‐147

$500,000 $350,000 14 Park  Rehabilitation  and  Development  (COMM)

$1,862,300 COMM_Key

Page 320: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  320  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lancaster Lancaster  City Comprehensive  Recreation  &  Park  Plan

BRC-­‐TAG-­‐12-­‐242

$110,000 $100,000 12 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$220,000 COMM_Key

Lancaster Lancaster  City Musser  Park BRC-­‐PRD-­‐8-­‐101

$174,000 $250,000 8 Park  Rehabilitation  and  Development  (COMM)

$347,700 COMM_Key

Lancaster Lancaster City Northeast Greenway Trail Project

BRC-TAG-19-134

$51,250.00 $25,000.00 19 Feasibility Studies (COMM)

$102,500.00 COMM_Key

Lancaster Lancaster City Northeast Greenway Trail Project

BRC-TAG-19-134

$51,250.00 $25,000.00 19 Feasibility Studies (COMM)

$102,500.00 COMM_Key

Lancaster Lancaster City Northeast Greenway Trail Project

BRC-TAG-19-134

$51,250.00 $25,000.00 19 Feasibility Studies (COMM)

$102,500.00 COMM_Key

Lancaster Lancaster  City TreeVitalize  Lancaster

BRC-­‐TV-­‐14-­‐3

$185,200 $25,000 14 Park  Rehabilitation  and  Development  (COMM)

$370,400 COMM_Key

Lancaster Lancaster  County Buchmiller,  Central  and  Peninsula  Park  Plans

BRC-­‐TAG-­‐10-­‐156

$82,000 $75,000 10 Master  Site  Plans  (COMM)

$204,000 COMM_Key

Lancaster Lancaster  County Central  Park KEY-­‐PRD-­‐4-­‐79

$166,000 $100,000 4 Park  Rehabilitation  and  Development  (COMM)

$332,000 COMM_Key

Page 321: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  321  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lancaster Lancaster  County Conestoga  Greenway  Trail

BRC-­‐PRD-­‐13-­‐112

$235,200 $200,000 13 Park  Rehabilitation  and  Development  (COMM)

$470,500 COMM_Key

Lancaster Lancaster  County Conewago  Trail  -­‐  Phase  2  Development

BRC-­‐RTD-­‐12-­‐10

$166,800 $166,800 12 Rail  Rehabilitation  and  Development  (RT)

$333,600 RT_Key

Lancaster Lancaster  County Lancaster  County  Skate  Park

KEY-­‐PRD-­‐5-­‐106

$136,857 $136,000 5 Park  Rehabilitation  and  Development  (COMM)

$273,715 COMM_Key

Lancaster Lancaster  County Natural  &  Historical  Resources  Inventory

BRC-­‐TAG-­‐6-­‐91

$23,300 $23,300 6 Natural  Areas  Inventories  (COMM)

$46,600 COMM_Key

Lancaster Lancaster  County Octoraro  Regional  Park

KEY-­‐ACQ-­‐3-­‐105

$62,000 $62,000 3 Acquisition  (COMM)

$124,000 COMM_Key

Lancaster Lancaster  County Trailheads,    Five  County  Parks

KEY-­‐PRD-­‐3-­‐106

$104,600 $75,000 3 Park  Rehabilitation  and  Development  (COMM)

$209,200 COMM_Key

Lancaster Lancaster  County  Conservancy  

Buchter  Property  Acquisition

BRC-­‐LTA-­‐14-­‐33

$205,500 $167,000 14 Critical  Habitat  Acquisition  (LT)

$411,000 LT_Key

Lancaster Lancaster  County  Conservancy  

Camp  Snyder  Acquisition

BRC-­‐LTA-­‐17-­‐55

$686,530 $640,800 17 Open  Space  Acquisition  (LT)

$1,372,660 LT_Key

Page 322: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  322  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lancaster Lancaster  County  Conservancy  

Edwards  Property  Acquisition

BRC-­‐LTA-­‐13.3-­‐519

$163,600 $163,000 13.3 Open  Space  Acquisition  (LT)

$327,100 LT_Key

Lancaster Lancaster  County  Conservancy  

Elizabethtown  Area  Park  Authority  Property

BRC-­‐LTA-­‐13.3-­‐520

$661,500 $661,000 13.3 Open  Space  Acquisition  (LT)

$1,323,000 LT_Key

Lancaster Lancaster  County  Conservancy  

Fishing  Creek KEY-­‐CHP-­‐2-­‐6

$5,000 $5,000 5 Coldwater  Heritage  Partnership

$5,000 RIVER_Key

Lancaster Lancaster  County  Conservancy  

Fishing  Creek  Preserve

KEY-­‐LTA-­‐3-­‐7 $34,838 $25,000 3 Critical  Habitat  Acquisition  (LT)

$70,000 LT_Key

Lancaster Lancaster  County  Conservancy  

Fishing  Creek  Watershed  Plan

BRC-­‐RCP-­‐9-­‐10

$96,800 $60,000 9 Planning  (RIV) $527,500 RIVER_Key

Lancaster Lancaster  County  Conservancy  

Guion  Land  Acquisition

BRC-­‐LTA-­‐9-­‐11

$846,200 $700,000 9 Open  Space  Acquisition  (LT)

$1,692,400 LT_Key

Lancaster Lancaster  County  Conservancy  

Hauer-­‐Trout  Run  Nature  Preserve

KEY-­‐LTA-­‐4-­‐10

$100,000 $100,000 4 Critical  Habitat  Acquisition  (LT)

$200,000 LT_Key

Lancaster Lancaster  County  Conservancy  

Houk  Property  Acquisition

BRC-­‐LTA-­‐12.5-­‐7

$66,000 $66,000 12.5 Open  Space  Acquisition  (LT)

$120,000 LT_Key

Lancaster Lancaster  County  Conservancy  

Keener  Property  Acquisition

BRC-­‐LTA-­‐11-­‐16

$107,600 $107,000 11 Open  Space  Acquisition  (LT)

$215,200 LT_Key

Lancaster Lancaster  County  Conservancy  

McKeever  Property  Acquisition/Steinman  Run

BRC-­‐LTA-­‐13.6-­‐612

$37,400 $65,000 13.6 Open  Space  Acquisition  (LT)

$174,800 LT_Key

Page 323: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  323  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lancaster Lancaster  County  Conservancy  

McKinney  Property  Acquisition

BRC-­‐LTA-­‐12.5-­‐8

$160,000 $160,000 12.5 Open  Space  Acquisition  (LT)

$320,000 LT_Key

Lancaster Lancaster  County  Conservancy  

New  Holland  Water  Authority  Acquisition  (Phase  3)

BRC-­‐LTA-­‐15-­‐120

$1,040,650 $1,040,000 15 Open  Space  Acquisition  (LT)

$2,081,300 LT_Key

Lancaster Lancaster  County  Conservancy  

New  Holland  Water  Authority  Acquisition  Phase  2

BRC-­‐LTA-­‐12-­‐23

$1,784,000 $1,784,000 12 Open  Space  Acquisition  (LT)

$3,568,000 LT_Key

Lancaster Lancaster  County  Conservancy  

Olcott  Acquisition BRC-­‐LTA-­‐9-­‐12

$35,000 $35,000 9 Open  Space  Acquisition  (LT)

$76,900 LT_Key

Lancaster Lancaster  County  Conservancy  

Seth  Land  Acquisition  -­‐  (Welsh  Mtn.  Nature  Preserve)

BRC-­‐LTA-­‐18-­‐11

$57,365 $57,300 18 Open  Space  Acquisition  (LT)

$114,730 LT_Key

Lancaster Lancaster  County  Conservancy  

Shoemaker  Acquisition

BRC-­‐LTA-­‐12.5-­‐9

$36,500 $36,000 12.5 Open  Space  Acquisition  (LT)

$73,000 LT_Key

Lancaster Lancaster  County  Conservancy  

Steinman  Run  Nature  Preserve

KEY-­‐LTA-­‐5-­‐6 $235,575 $225,000 5 Critical  Habitat  Acquisition  (LT)

$471,150 LT_Key

Lancaster Lancaster  County  Conservancy  

Sweigart  Acquisition BRC-­‐LTA-­‐9-­‐13

$37,000 $37,000 9 Open  Space  Acquisition  (LT)

$74,400 LT_Key

Lancaster Lancaster  County  Conservancy  

Swift  Land  Acquisition  -­‐  (Welsh  Mtn.  Nature  Preserve)

BRC-­‐LTA-­‐18-­‐12

$56,299 $56,300 18 Open  Space  Acquisition  (LT)

$112,597 LT_Key

Page 324: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  324  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lancaster Lancaster  County  Conservancy  

Tucquan  Glen  Nature  Preserve

KEY-­‐LTA-­‐5-­‐7 $41,175 $40,000 5 Critical  Habitat  Acquisition  (LT)

$87,350 LT_Key

Lancaster Lancaster  County  Conservancy  

Tucquan  Glen/Pyfer  Nature  Preserve

KEY-­‐LTA-­‐1-­‐5 $90,000 $72,000 1 Critical  Habitat  Acquisition  (LT)

$200,000 LT_Key

Lancaster Lancaster  County  Conservancy  

Tucquan  Glen/Pyfer  Nature  Preserve

KEY-­‐LTA-­‐2-­‐5 $13,500 $13,500 2 Open  Space  Acquisition  (LT)

$27,000 LT_Key

Lancaster Lancaster  County  Conservancy  

Wilhelm  Property  Acquisition

BRC-­‐LTA-­‐13.3-­‐521

$332,000 $331,000 13.3 Open  Space  Acquisition  (LT)

$664,000 LT_Key

Lancaster Lancaster  County  Conservation  District  

TreeVitalize  Metros BRC-­‐TV-­‐16-­‐244

$100,000 $100,000 16 Park  Rehabilitation  and  Development  (COMM)

$200,000 COMM_Key

Lancaster Lancaster  Inter-­‐Municipal  Committee  

Conestoga  River  Management  Study

KEY-­‐TAG-­‐1-­‐69

$25,000 $25,000 1 Greenway  Plans  (COMM)

$50,000 COMM_Key

Lancaster Lancaster  School  District  

Buchanan-­‐Carter/MacRae-­‐Washington-­‐Wickersham  Playgrounds

BRC-­‐PRD-­‐12-­‐165

$200,000 $200,000 12 Park  Rehabilitation  and  Development  (COMM)

$400,000 COMM_Key

Lancaster Lancaster  Township Maple  Grove  Park BRC-­‐PRD-­‐7-­‐98

$42,837 $35,000 7 Park  Rehabilitation  and  Development  (COMM)

$85,675 COMM_Key

Page 325: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  325  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lancaster Leacock  Township Community  Park KEY-­‐ACQ-­‐3-­‐110

$125,000 $100,000 3 Acquisition  (COMM)

$250,000 COMM_Key

Lancaster Lititz  Borough Greenway  &  Trail  Plan

BRC-­‐TAG-­‐7-­‐102

$20,000 $20,000 7 Greenway  Plans  (COMM)

$40,000 COMM_Key

Lancaster Manheim  Borough Manheim  Central  Reg.  Circuit  Rider  -­‐  Yr.  1

KEY-­‐TAG-­‐4-­‐90

$35,000 $35,000 4 Circuit  Rider  (COMM)

$35,000 COMM_Key

Lancaster Manheim  Borough Manheim  Community  Pool  Feasibility  Study

BRC-­‐TAG-­‐13-­‐193

$12,300 $12,300 13 Feasibility  Studies  (COMM)

$24,600 COMM_Key

Lancaster Manheim  Borough Mummau  Park BRC-­‐ACQ-­‐7-­‐115

$43,850 $44,000 7 Acquisition  (COMM)

$96,400 COMM_Key

Lancaster Manheim  Borough Peer-­‐to-­‐Peer KEY-­‐TAG-­‐3-­‐247

$7,500 $7,500 3 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$8,250 COMM_Key

Lancaster Manheim  Central  Recreation  Commission  

Comp.  &  Greenway  Plan

BRC-­‐TAG-­‐6-­‐105

$34,500 $34,500 6 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$69,000 COMM_Key

Lancaster Manheim  Central  Recreation  Commission  

Manheim  Reg.  Community  Center  Feasibility  Study

BRC-­‐TAG-­‐9-­‐127

$16,000 $16,000 9 Feasibility  Studies  (COMM)

$32,000 COMM_Key

Lancaster Manheim  Central  Recreation  Commission  

Rife  Run  Nature  Path/Playground

BRC-­‐PRD-­‐11-­‐54

$53,200 $53,200 11 Park  Rehabilitation  and  Development  (COMM)

$106,500 COMM_Key

Lancaster Manheim  Township Dombach  Land  Acquisition

BRC-­‐ACQ-­‐7-­‐116

$251,400 $200,000 7 Acquisition  (COMM)

$672,400 COMM_Key

Page 326: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  326  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lancaster Manheim  Township Overlook  Park  Expansion

KEY-­‐ACQ-­‐2-­‐92

$235,000 $175,000 2 Acquisition  (COMM)

$735,000 COMM_Key

Lancaster Manheim  Township Perelman  Park KEY-­‐PRD-­‐4-­‐91

$125,000 $100,000 4 Park  Rehabilitation  and  Development  (COMM)

$257,825 COMM_Key

Lancaster Manheim  Township Perelman,  Jaycee  and  Landis  Woods  Parks  Master  Site  Plans

BRC-­‐TAG-­‐18-­‐148

$23,270 $23,200 18 Master  Site  Plans  (COMM)

$46,540 COMM_Key

Lancaster Manor  Township Comprehensive  Recreation,  Park  and  Open  Space  Plan

BRC-­‐TAG-­‐12-­‐248

$25,000 $25,000 12 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$50,000 COMM_Key

Lancaster Manor  Township Greider  Park BRC-­‐PRD-­‐6-­‐106

$29,930 $30,000 6 Park  Rehabilitation  and  Development  (COMM)

$59,860 COMM_Key

Lancaster Marietta  Borough NW  Lancaster  County  River  Trail  –  Marietta  Trailhead  Acquisition

BRC-­‐ACQ-­‐17-­‐96

$13,100 $13,100 17 Acquisition  (COMM)

$26,200 COMM_Key

Lancaster Marietta  Borough Susquehanna  River  Park

KEY-­‐ACQ-­‐1-­‐78

$25,413 $25,000 1 Acquisition  (COMM)

$50,826 COMM_Key

Page 327: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  327  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lancaster Millersville  Borough Freedom  Memorial  Park

BRC-­‐PRD-­‐13-­‐124

$154,400 $100,000 13 Park  Rehabilitation  and  Development  (COMM)

$308,800 COMM_Key

Lancaster Mount  Joy  Borough Grandview  Elementary  School  Acquisition

BRC-­‐ACQ-­‐11-­‐180

$250,000 $125,000 11 Acquisition  (COMM)

$580,000 COMM_Key

Lancaster Mount  Joy  Borough  Authority  

Little  Chickies  Creek  Watershed  Conservation  Plan

BRC-­‐RCP-­‐9-­‐11

$30,000 $40,000 9 Planning  (RIV) $80,000 RIVER_Key

Lancaster Mount  Joy  Township Cove  Outlook  Park BRC-­‐PRD-­‐13-­‐128

$195,500 $150,000 13 Park  Rehabilitation  and  Development  (COMM)

$391,900 COMM_Key

Lancaster Mount  Joy  Township EAPA  Property  Acquisition/Conewago  Trail

BRC-­‐ACQ-­‐14-­‐62

$372,800 $250,000 14 Acquisition  (COMM)

$745,500 COMM_Key

Lancaster Mount  Joy  Township Old  Trolley  Line  Park  Master  Site  Plan

BRC-­‐TAG-­‐17-­‐14

$23,075 $15,000 17 Master  Site  Plans  (COMM)

$46,150 COMM_Key

Lancaster Mount  Joy  Township Wolgemuth  Park BRC-­‐PRD-­‐8-­‐124

$277,500 $100,000 8 Park  Rehabilitation  and  Development  (COMM)

$555,000 COMM_Key

Page 328: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  328  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lancaster Mountville  Borough Grubb  Lake  Park BRC-­‐PRD-­‐8-­‐127

$152,300 $130,000 8 Park  Rehabilitation  and  Development  (COMM)

$304,500 COMM_Key

Lancaster Paradise  Township Community  Park KEY-­‐SC-­‐2-­‐115

$20,000 $20,000 2 Small  Communities/Small  Projects  (COMM)

$36,100 COMM_Key

Lancaster Pequea  Township Silver  Mine  Park BRC-­‐SC-­‐7-­‐153

$6,779 $7,000 7 Small  Communities/Small  Projects  (COMM)

$13,559 COMM_Key

Lancaster Pequea  Township Silver  Mine  Park KEY-­‐ACQ-­‐4-­‐123

$135,000 $100,000 4 Acquisition  (COMM)

$270,000 COMM_Key

Lancaster Pequea  Township Silver  Mine  Park KEY-­‐PRD-­‐3-­‐166

$65,600 $65,600 3 Park  Rehabilitation  and  Development  (COMM)

$131,200 COMM_Key

Lancaster Pequea  Township Silver  Mine  Park  Development

BRC-­‐PRD-­‐12-­‐183

$33,600 $33,600 12 Park  Rehabilitation  and  Development  (COMM)

$67,200 COMM_Key

Lancaster Providence  Township

Enola  Low  Grade  Trail  -­‐  Providence  to  Quarryville  –  Development

BRC-­‐RTD-­‐18-­‐171

$408,450 $408,400 18 Rail  Rehabilitation  and  Development  (RT)

$816,899 COMM_Key

Page 329: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  329  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lancaster Quarryville  Borough SECA  Circuit  Rider-­‐1st  Year

BRC-­‐TAG-­‐7-­‐4

$35,000 $90,405 7 Circuit  Rider  (COMM)

$146,065 COMM_Key

Lancaster Rapho  Township Community  Park  -­‐  Phase  2  Development

BRC-­‐PRD-­‐12-­‐192

$300,000 $150,000 12 Park  Rehabilitation  and  Development  (COMM)

$605,500 COMM_Key

Lancaster Rapho  Township Community  Park  -­‐  Phase  III

BRC-­‐PRD-­‐13.3-­‐418

$200,000 $200,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$401,600 COMM_Key

Lancaster Rapho  Township Rapho  Park-­‐  Phase  4-­‐  Development

BRC-­‐PRD-­‐16-­‐156

$77,540 $77,000 16 Park  Rehabilitation  and  Development  (COMM)

$155,087 COMM_Key

Lancaster The  Nature  Conservancy  

Rock  Springs  Barrens KEY-­‐LTA-­‐3-­‐17

$240,000 $240,000 3 Critical  Habitat  Acquisition  (LT)

$480,000 LT_Key

Lancaster Upper  Leacock  Township

Community  Building  Master  Site  Plan

BRC-­‐TAG-­‐8-­‐199

$15,400 $15,000 8 Master  Site  Plans  (COMM)

$31,800 COMM_Key

Lancaster Upper  Leacock  Township

Leola  Comm.  Park  Master  Plan  &  Pool  Feas.Study

KEY-­‐TAG-­‐5-­‐207

$12,900 $12,900 5 Feasibility  Studies  (COMM)

$25,800 COMM_Key

Lancaster Upper  Leacock  Township

Leola  Community  Pool

BRC-­‐PRD-­‐7-­‐195

$249,900 $200,000 7 Park  Rehabilitation  and  Development  (COMM)

$672,786 COMM_Key

Page 330: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  330  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lancaster Upper  Leacock  Township

Leola  Community  Pool  &  Playground

BRC-­‐PRD-­‐10-­‐139

$26,000 $26,000 10 Park  Rehabilitation  and  Development  (COMM)

$52,000 COMM_Key

Lancaster Upper  Leacock  Township

Olde  Leacock  Village KEY-­‐PRD-­‐4-­‐156

$22,600 $22,600 4 Park  Rehabilitation  and  Development  (COMM)

$45,200 COMM_Key

Lancaster Upper  Leacock  Township

Peer-­‐to-­‐Peer KEY-­‐TAG-­‐5-­‐235

$7,500 $7,500 5 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$8,250 COMM_Key

Lancaster Warwick  Township Circuit  Rider BRC-­‐TAG-­‐11-­‐248

$95,125 $95,125 11 Circuit  Rider  (COMM)

$164,000 COMM_Key

Lancaster Warwick  Township Feasibility  Study KEY-­‐RTP-­‐3-­‐24

$7,700 $7,700 3 Feasibility  Studies  (RT)

$15,400 RT_Key

Lancaster Warwick  Township Linear  Park-­‐Phase  II KEY-­‐PRD-­‐2-­‐165

$77,100 $77,000 2 Park  Rehabilitation  and  Development  (COMM)

$154,200 COMM_Key

Lancaster Warwick  Township Lititz/Warwick  Comp.  Recreation  Park  &  Open  Space

BRC-­‐TAG-­‐6-­‐191

$25,000 $25,000 6 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$50,000 COMM_Key

Page 331: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  331  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lancaster Warwick  Township Municipal  Campus  Expansion

BRC-­‐PRD-­‐11-­‐96

$150,000 $125,000 11 Park  Rehabilitation  and  Development  (COMM)

$500,200 COMM_Key

Lancaster Warwick  Township Peer  to  Peer BRC-­‐TAG-­‐9-­‐237

$7,500 $7,500 9 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$8,250 COMM_Key

Lancaster Warwick  Township Warwick  Twp.  Rails-­‐To-­‐Trails  Park

KEY-­‐RTD-­‐5-­‐20

$65,000 $65,000 5 Rail  Rehabilitation  and  Development  (RT)

$133,751 RT_Key

Lancaster West  Cocalico  Township

Schoeneck  Park KEY-­‐PRD-­‐3-­‐232

$73,800 $73,800 3 Park  Rehabilitation  and  Development  (COMM)

$148,800 COMM_Key

Lancaster West  Donegal  Township

Rheems  Athletic  Field

KEY-­‐ACQ-­‐3-­‐233

$47,000 $40,000 3 Acquisition  (COMM)

$94,000 COMM_Key

Lancaster West  Earl  Township Conestoga  Valley  Rec.  Center  Feasibility

KEY-­‐TAG-­‐3-­‐234

$7,500 $7,500 3 Feasibility  Studies  (COMM)

$15,000 COMM_Key

Lancaster West  Earl  Township Eagle  View  Park  -­‐  Development

BRC-­‐PRD-­‐17-­‐161

$100,000 $100,000 17 Park  Rehabilitation  and  Development  (COMM)

$200,000 COMM_Key

Page 332: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  332  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lancaster West  Earl  Township Lion's  Club  Park BRC-­‐PRD-­‐8-­‐212

$70,000 $70,000 8 Park  Rehabilitation  and  Development  (COMM)

$140,000 COMM_Key

Lancaster West  Lampeter  Township

Jemet  Property KEY-­‐ACQ-­‐2-­‐172

$250,000 $175,000 2 Acquisition  (COMM)

$500,000 COMM_Key

Lancaster,  York

Lancaster  County  Conservancy  

Holtwood  Acquisition  -­‐  (PPL  Land)

BRC-­‐LTA-­‐13.6-­‐553

$4,200,000 $2,000,000 13.6 Open  Space  Acquisition  (LT)

$20,141,900 LT_Key

Lancaster,  York

Lancaster  County  Conservancy  

PPL  Lease  Management  Plan

BRC-­‐LTP-­‐14-­‐213

$90,400 $90,000 14 Critical  Habitat  Planning  (LT)

$180,799 LT_Key

Lancaster, York Lancaster County Conservancy

Susquehanna Riverlands Implementation 2014

BRC-SR-19-170

$160,112.00 $25,000.00 19 Partnerships Projects

$216,123.00 LT_Key

Lancaster, York Lancaster County Conservancy

Susquehanna Riverlands Implementation 2014

BRC-SR-19-170

$160,112.00 $25,000.00 19 Partnerships Projects

$216,123.00 LT_Key

Lancaster, York Lancaster County Conservancy

Susquehanna Riverlands Implementation 2014

BRC-SR-19-170

$160,112.00 $25,000.00 19 Partnerships Projects

$216,123.00 LT_Key

Lancaster, York Lancaster County Conservancy

Susquehanna Riverlands Implementation 2014

BRC-SR-19-170

$160,112.00 $25,000.00 19 Partnerships Projects

$216,123.00 LT_Key

Lancaster, York Lancaster County Conservancy

Susquehanna Riverlands Implementation 2014

BRC-SR-19-170

$160,112.00 $25,000.00 19 Partnerships Projects

$216,123.00 LT_Key

Lancaster, York Lancaster County Conservancy

Susquehanna Riverlands Implementation 2014

BRC-SR-19-170

$160,112.00 $25,000.00 19 Partnerships Projects

$216,123.00 LT_Key

Lancaster, York Lancaster County Conservancy

Susquehanna Riverlands Implementation 2014

BRC-SR-19-170

$160,112.00 $25,000.00 19 Partnerships Projects

$216,123.00 LT_Key

Page 333: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  333  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lancaster, York Lancaster County Conservancy

Susquehanna Riverlands Implementation 2014

BRC-SR-19-170

$160,112.00 $25,000.00 19 Partnerships Projects

$216,123.00 LT_Key

Lancaster, York Lancaster County Conservancy

Susquehanna Riverlands Implementation 2014

BRC-SR-19-170

$160,112.00 $25,000.00 19 Partnerships Projects

$216,123.00 LT_Key

Lancaster, York Lancaster County Conservancy

Susquehanna Riverlands Implementation 2014

BRC-SR-19-170

$160,112.00 $25,000.00 19 Partnerships Projects

$216,123.00 LT_Key

Lancaster, York Lancaster County Conservancy

Susquehanna Riverlands Implementation 2014

BRC-SR-19-170

$160,112.00 $25,000.00 19 Partnerships Projects

$216,123.00 LT_Key

Lancaster, York Lancaster County Conservancy

Susquehanna Riverlands Implementation 2014

BRC-SR-19-170

$160,112.00 $25,000.00 19 Partnerships Projects

$216,123.00 LT_Key

Lancaster, York Lancaster County Conservancy

Susquehanna Riverlands Implementation 2014

BRC-SR-19-170

$160,112.00 $25,000.00 19 Partnerships Projects

$216,123.00 LT_Key

Lancaster, York Lancaster County Conservancy

Susquehanna Riverlands Implementation 2014

BRC-SR-19-170

$160,112.00 $25,000.00 19 Partnerships Projects

$216,123.00 LT_Key

Lawrence Bessemer  Borough Bessemer  Playground

BRC-­‐SC-­‐10-­‐66

$14,800 $20,000 10 Small  Communities/Small  Projects  (COMM)

$14,800 COMM_Key

Lawrence Ellport  Borough William  Rodgers  Memorial  Park

KEY-­‐SC-­‐2-­‐45 $20,000 $20,000 2 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Lawrence Ellwood  City  Borough

Connoquennessing  Creek  Trail  &  River  Access  Study

BRC-­‐TAG-­‐14-­‐203

$9,000 $9,000 14 Trail  Study  (COMM)

$18,000 COMM_Key

Page 334: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  334  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lawrence Ellwood  City  Borough

Ellwood  City  Community  Plaza-­‐  Development

BRC-­‐PRD-­‐16-­‐132

$350,000 $350,000 16 Park  Rehabilitation  and  Development  (COMM)

$1,141,000 COMM_Key

Lawrence Ellwood  City  Borough

Ewing  Park KEY-­‐PRD-­‐5-­‐60

$25,000 $25,000 5 Park  Rehabilitation  and  Development  (COMM)

$50,000 COMM_Key

Lawrence Ellwood  City  Borough

Ewing  Park  Recreation  Complex

BRC-­‐PRD-­‐12-­‐152

$34,500 $34,500 12 Park  Rehabilitation  and  Development  (COMM)

$69,000 COMM_Key

Lawrence Ellwood  City  Borough

Ewing  Park  Trail BRC-­‐PRD-­‐7-­‐66

$21,273 $21,000 7 Park  Rehabilitation  and  Development  (COMM)

$42,546 COMM_Key

Lawrence Ellwood  City  Borough

Trail  Acquisition-­‐Pennsylvania  Power  Co.  Property

BRC-­‐ACQ-­‐9-­‐72

$49,200 $49,000 9 Acquisition  (COMM)

$98,500 COMM_Key

Lawrence Enon  Valley  Borough Caulfield  Park-­‐Phase1-­‐2-­‐Development

BRC-­‐PRD-­‐17-­‐118

$158,047 $148,000 17 Park  Rehabilitation  and  Development  (COMM)

$358,094 COMM_Key

Lawrence Enon  Valley  Borough Master  Site  Plan  for  Caulfield  Park

BRC-­‐TAG-­‐13.3-­‐469

$12,500 $12,500 13.3 Master  Site  Plans  (COMM)

$25,000 COMM_Key

Page 335: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  335  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lawrence Hickory  Township C.J.  Long  Spartan  Park

BRC-­‐PRD-­‐11-­‐43

$137,500 $137,500 11 Park  Rehabilitation  and  Development  (COMM)

$275,000 COMM_Key

Lawrence Hickory  Township C.J.  Long  Spartan  Park

BRC-­‐PRD-­‐13-­‐108

$313,500 $313,500 13 Park  Rehabilitation  and  Development  (COMM)

$627,000 COMM_Key

Lawrence Lawrence  County East  Side  Community  Center  Feasibility  Study

BRC-­‐TAG-­‐7-­‐99

$10,000 $10,000 7 Feasibility  Studies  (COMM)

$20,000 COMM_Key

Lawrence Lawrence  County Greenway  and  Open  Space  Plan

BRC-­‐TAG-­‐11.5-­‐24

$25,000 $25,000 11.5 Greenway  Plans  (COMM)

$50,000 COMM_Key

Lawrence Lawrence  County Mahoning  River  Watershed  Conservation  Plan

BRC-­‐RCP-­‐14-­‐290

$50,000 $50,000 14 Planning  (RIV) $100,000 COMM_Key

Lawrence Lawrence  County Natural  Heritage  Inventory

BRC-­‐TAG-­‐6-­‐92

$44,300 $44,300 6 Natural  Areas  Inventories  (COMM)

$88,600 COMM_Key

Lawrence Lawrence  County Stavich  Bike  Trail BRC-­‐PRT-­‐14-­‐9

$224,300 $138,500 14 Development  and  Rehabilitation

$276,300 COMM_Key

Lawrence Lawrence  County Two  Boat  Launches BRC-­‐RCD-­‐14-­‐288

$45,000 $45,000 14 Development  (RIV)

$90,000 COMM_Key

Lawrence Lawrence  County Urban  Tree  Revitalization  Project

BRC-­‐PRD-­‐15-­‐57

$40,000 $40,000 15 Park  Rehabilitation  and  Development  (COMM)

$80,000 COMM_Key

Page 336: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  336  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lawrence Lawrence  County West  Park KEY-­‐PRD-­‐4-­‐81

$47,500 $47,500 4 Park  Rehabilitation  and  Development  (COMM)

$97,300 COMM_Key

Lawrence Lawrence  County West  Park-­‐Development

BRC-­‐PRD-­‐16-­‐144

$37,000 $37,000 16 Park  Rehabilitation  and  Development  (COMM)

$74,000 COMM_Key

Lawrence Neshannock  Township

Pearson  Park BRC-­‐PRD-­‐9-­‐147

$125,000 $125,000 9 Park  Rehabilitation  and  Development  (COMM)

$500,000 COMM_Key

Lawrence Neshannock  Township

Pearson  Park KEY-­‐PRD-­‐5-­‐141

$50,000 $50,000 5 Park  Rehabilitation  and  Development  (COMM)

$164,342 COMM_Key

Lawrence New  Castle  City Cascade  Park BRC-­‐PRD-­‐10-­‐128

$38,755 $38,000 10 Park  Rehabilitation  and  Development  (COMM)

$77,510 COMM_Key

Lawrence New  Castle  City Cascade  Park KEY-­‐PRD-­‐4-­‐112

$155,262 $100,000 4 Park  Rehabilitation  and  Development  (COMM)

$310,525 COMM_Key

Page 337: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  337  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lawrence New  Castle  City Master  Site  Development  Plan

KEY-­‐TAG-­‐1-­‐92

$15,000 $15,000 1 Master  Site  Plans  (COMM)

$30,000 COMM_Key

Lawrence New  Castle  City Urban  Green  Space  Project

BRC-­‐PRD-­‐12-­‐53

$200,000 $200,000 12 Park  Rehabilitation  and  Development  (COMM)

$400,000 COMM_Key

Lawrence New  Wilmington  Borough

Borough  Park-­‐Rehabilitation

BRC-­‐PRD-­‐15-­‐64

$123,200 $65,000 15 Park  Rehabilitation  and  Development  (COMM)

$246,400 COMM_Key

Lawrence New  Wilmington  Borough

New  Wilmington  Borough  Park  Master  Plan

BRC-­‐TAG-­‐13.3-­‐482

$17,500 $17,500 13.3 Master  Site  Plans  (COMM)

$35,000 COMM_Key

Lawrence New  Wilmington  Borough

Pool  Renovation BRC-­‐PRD-­‐12-­‐177

$199,300 $185,400 12 Park  Rehabilitation  and  Development  (COMM)

$398,600 COMM_Key

Lawrence North  Beaver  Township

Municipal  Park KEY-­‐SC-­‐5-­‐149

$20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$20,525 COMM_Key

Lawrence Shenango  Township Community  Park KEY-­‐PRD-­‐1-­‐125

$203,798 $125,000 1 Park  Rehabilitation  and  Development  (COMM)

$407,596 COMM_Key

Page 338: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  338  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lawrence Shenango  Township Community  Park  -­‐  Phase  II

KEY-­‐PRD-­‐5-­‐181

$75,000 $75,000 5 Park  Rehabilitation  and  Development  (COMM)

$150,000 COMM_Key

Lawrence South  New  Castle  Borough

Borough  Park KEY-­‐SC-­‐2-­‐144

$7,475 $7,400 2 Small  Communities/Small  Projects  (COMM)

$8,475 COMM_Key

Lawrence Union  Township Scotland  Meadows  Park  Shelter

BRC-­‐PRD-­‐11-­‐93

$35,400 $35,400 11 Park  Rehabilitation  and  Development  (COMM)

$70,800 COMM_Key

Lawrence Volant  Borough Borough  Park KEY-­‐SC-­‐2-­‐162

$12,400 $12,400 2 Small  Communities/Small  Projects  (COMM)

$14,900 COMM_Key

Lawrence Wilmington  Township

Marti  Park  Phase  II KEY-­‐SC-­‐2-­‐179

$20,000 $20,000 2 Small  Communities/Small  Projects  (COMM)

$21,000 COMM_Key

Lebanon Annville  Township K  &  J  Smith  Land  Acquisition  -­‐  Quittie  Creek  Nature  Park  Expansion

BRC-­‐ACQ-­‐17-­‐87

$38,100 $36,100 17 Acquisition  (COMM)

$76,200 COMM_Key

Lebanon Bethel  Township Circuit  Rider BRC-­‐TAG-­‐15-­‐27

$50,000 $122,580 15 Circuit  Rider  (COMM)

$96,500 COMM_Key

Page 339: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  339  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lebanon Cleona  Borough Cleona  Park  -­‐  Phase  I BRC-­‐SC-­‐11-­‐111

$40,000 $40,000 11 Small  Communities/Small  Projects  (COMM)

$89,200 COMM_Key

Lebanon East  Hanover  Township

H  M  Levitz  Memorial  Park  Renovation

BRC-­‐PRD-­‐12-­‐149

$172,200 $70,000 12 Park  Rehabilitation  and  Development  (COMM)

$344,400 COMM_Key

Lebanon Jackson  Township Fairlane  Avenue  Acquisition

BRC-­‐ACQ-­‐13-­‐34

$139,700 $39,000 13 Acquisition  (COMM)

$279,400 COMM_Key

Lebanon Jackson  Township Fairlane  Avenue  Park  -­‐  Phase  1  -­‐  Development

BRC-­‐PRD-­‐17-­‐125

$200,000 $200,000 17 Park  Rehabilitation  and  Development  (COMM)

$436,366 COMM_Key

Lebanon Jonestown  Borough Community  Park KEY-­‐SC-­‐5-­‐101

$20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Lebanon Jonestown  Borough Community  Park-­‐Phase  II

BRC-­‐SC-­‐8-­‐99

$30,000 $30,000 8 Small  Communities/Small  Projects  (COMM)

$40,000 COMM_Key

Lebanon Jonestown  Borough Master  Plans-­‐Irene  Moore/Twin  Creek  Properties

BRC-­‐TAG-­‐10-­‐155

$6,000 $6,000 10 Master  Site  Plans  (COMM)

$12,000 COMM_Key

Lebanon Jonestown  Borough Moore  Property  Acquisition

BRC-­‐ACQ-­‐9-­‐105

$40,000 $40,000 9 Acquisition  (COMM)

$80,000 COMM_Key

Page 340: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  340  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lebanon Lebanon  City Coleman  Memorial  Park

KEY-­‐PRD-­‐3-­‐111

$20,000 $20,000 3 Park  Rehabilitation  and  Development  (COMM)

$40,000 COMM_Key

Lebanon Lebanon  City Coleman  Memorial  Park-­‐Development

BRC-­‐PRD-­‐18-­‐80

$451,335 $450,000 18 Park  Rehabilitation  and  Development  (COMM)

$951,570 COMM_Key

Lebanon Lebanon  City Coleman's  Park  Master  Site  Plan

BRC-­‐TAG-­‐13.6-­‐597

$40,000 $40,000 13.6 Master  Site  Plans  (COMM)

$80,000 COMM_Key

Lebanon Lebanon  City Gingrich  Memorial  Pool

BRC-­‐PRD-­‐6-­‐94

$250,000 $200,000 6 Park  Rehabilitation  and  Development  (COMM)

$1,270,800 COMM_Key

Lebanon Lebanon  City South  Sixth  Street  Playground

BRC-­‐PRD-­‐13-­‐114

$120,700 $120,000 13 Park  Rehabilitation  and  Development  (COMM)

$241,600 COMM_Key

Lebanon Lebanon  City Tennis  Courts-­‐Three  Sites

KEY-­‐PRD-­‐2-­‐78

$67,500 $67,500 2 Park  Rehabilitation  and  Development  (COMM)

$135,000 COMM_Key

Lebanon Lebanon  County Greenways,  Park  and  Recreation  Plan

BRC-­‐TAG-­‐14-­‐2

$13,500 $13,500 14 Greenway  Plans  (COMM)

$27,000 COMM_Key

Lebanon Lebanon  County Greenways,  Park  and  Recreation  Plan

BRC-­‐TAG-­‐9-­‐112

$100,000 $100,000 9 Greenway  Plans  (COMM)

$653,000 COMM_Key

Page 341: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  341  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lebanon Lebanon  County Lebanon  Valley  Rail  Trail  -­‐  Cornwall  Trailhead  Expansion  -­‐  Development

BRC-­‐PRD-­‐18-­‐175

$200,000 $125,000 18 Park  Rehabilitation  and  Development  (COMM)

$250,000 COMM_Key

Lebanon Lebanon  County Lebanon  Valley  Rail  Trail  -­‐  Phase  -­‐IV

BRC-­‐RTD-­‐14-­‐280

$302,000 $300,000 14 Rail  Rehabilitation  and  Development  (RT)

$782,900 RT_Key

Lebanon Lebanon  County Lebanon  Valley  Rail  Trail  -­‐  Phase  9

BRC-­‐RTD-­‐16-­‐245

$236,000 $236,000 16 Rail  Rehabilitation  and  Development  (RT)

$472,000 COMM_Key

Lebanon Lebanon  County Lebanon  Valley  Rail-­‐Trail  -­‐  Phase  4

BRC-­‐RTA-­‐9-­‐7

$61,000 $61,000 9 Acquisition  (RT) $122,000 RT_Key

Lebanon Lebanon  County Lebanon  Valley  Rail-­‐Trail  –  Phase  6  Feasibility  Study

BRC-­‐RTP-­‐17-­‐208

$12,500 $12,500 17 Feasibility  Studies  (RT)

$25,000 COMM_Key

Lebanon Lebanon  County Lebanon  Valley  Rail-­‐Trail-­‐Phase  III

BRC-­‐RTD-­‐8-­‐10

$273,200 $273,000 8 Rail  Rehabilitation  and  Development  (RT)

$723,200 RT_Key

Lebanon Lebanon  County Peer  to  Peer BRC-­‐TAG-­‐9-­‐238

$7,500 $7,500 9 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$8,250 COMM_Key

Page 342: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  342  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lebanon Lebanon  County Phase  5,  Lebanon  Valley  Rail  Trail  

BRC-­‐RTD-­‐15-­‐153

$272,502 $177,835 15 Rail  Rehabilitation  and  Development  (RT)

$620,647 COMM_Key

Lebanon Lebanon  County Union  Canal  Tunnel  Park

KEY-­‐ACQ-­‐2-­‐79

$255,400 $250,000 2 Acquisition  (COMM)

$510,800 COMM_Key

Lebanon Lebanon  County Union  Canal  Tunnel  Park

KEY-­‐PRD-­‐3-­‐112

$100,000 $200,000 3 Park  Rehabilitation  and  Development  (COMM)

$200,000 COMM_Key

Lebanon Lebanon  County  Conservation  District  

TreeVitalize  Metros BRC-­‐TV-­‐15-­‐12

$50,000 $50,000 15 Park  Rehabilitation  and  Development  (COMM)

$100,000 COMM_Key

Lebanon Lebanon  Valley  Rails  To  Trails,  Inc.  

Feasibility  Study KEY-­‐RTP-­‐3-­‐10

$8,000 $8,000 3 Feasibility  Studies  (RT)

$16,000 RT_Key

Lebanon Millcreek  Township White  Swan  Park KEY-­‐SC-­‐3-­‐139

$20,000 $20,000 3 Small  Communities/Small  Projects  (COMM)

$36,300 COMM_Key

Lebanon North Cornwall Township

Gloninger Woods Park- Development

BRC-PRD-19-100

$250,000.00 $250,000.00 19 Park Rehabilitation and Development (COMM)

$511,377.00 COMM_Key

Page 343: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  343  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lebanon North Cornwall Township

Gloninger Woods Park- Development

BRC-PRD-19-100

$250,000.00 $250,000.00 19 Park Rehabilitation and Development (COMM)

$511,377.00 COMM_Key

Lebanon North Cornwall Township

Gloninger Woods Park- Development

BRC-PRD-19-100

$250,000.00 $250,000.00 19 Park Rehabilitation and Development (COMM)

$511,377.00 COMM_Key

Lebanon North  Lebanon  Township

Comp  Plan  with  Moyer  Tract  Master  Site  Plan

BRC-­‐TAG-­‐11-­‐228

$23,800 $23,800 11 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$47,700 COMM_Key

Lebanon North  Lebanon  Township

Lenni  Lenape  Park-­‐  Phase  1-­‐  Development

BRC-­‐PRD-­‐16-­‐150

$181,512 $181,500 16 Park  Rehabilitation  and  Development  (COMM)

$474,415 COMM_Key

Lebanon North  Lebanon  Township

Moyer  Tract  Acquisition

BRC-­‐ACQ-­‐9-­‐151

$161,600 $110,000 9 Acquisition  (COMM)

$323,200 COMM_Key

Lebanon Northern  Lebanon  Recreation  and  Parks  Commission  

Comp.  Rec.,  Open  Space  and  Greenway  Plan

BRC-­‐TAG-­‐17-­‐18

$29,000 $29,000 17 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$58,000 COMM_Key

Lebanon Palmyra  Area  Recreation  and  Parks  Commission  

Comp.  Rec.,  Park  and  Open  Space  Plan

BRC-­‐TAG-­‐10-­‐163

$12,500 $12,500 10 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$25,000 COMM_Key

Page 344: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  344  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lebanon Palmyra  Borough Fireman's  Park-­‐Development

BRC-­‐PRD-­‐18-­‐88

$230,020 $200,000 18 Park  Rehabilitation  and  Development  (COMM)

$498,576 COMM_Key

Lebanon South  Lebanon  Township

South  Hills  Park  Acquisition

BRC-­‐ACQ-­‐9-­‐194

$317,000 $150,000 9 Acquisition  (COMM)

$634,000 COMM_Key

Lebanon South  Lebanon  Township

South  LebanonTrail  -­‐  Phase  1  Development

BRC-­‐PRD-­‐12-­‐201

$50,000 $35,800 12 Park  Rehabilitation  and  Development  (COMM)

$229,400 COMM_Key

Lebanon South  Londonderry  Township

Campbelltown  Community  Park-­‐  Development

BRC-­‐PRD-­‐18-­‐195

$193,261 $193,300 18 Park  Rehabilitation  and  Development  (COMM)

$391,000 COMM_Key

Lebanon South  Londonderry  Township

Lawn  Community  Park

KEY-­‐PRD-­‐4-­‐144

$31,300 $31,300 4 Park  Rehabilitation  and  Development  (COMM)

$62,600 COMM_Key

Lebanon Swatara  Creek  Watershed  Association,  Inc.  

Wise  Property  Acquisition

BRC-­‐RCA-­‐13.3-­‐512

$192,100 $190,000 13.3 Acquisition  (RIV)

$384,200 RIVER_Key

Lebanon Swatara  Township Landis  Land  Acquisition

BRC-­‐ACQ-­‐9-­‐203

$35,500 $35,000 9 Acquisition  (COMM)

$70,000 COMM_Key

Lebanon Swatara Township Mill Street Park- Phase 3- Development

BRC-SC-19-51

$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)

$60,000.00 COMM_Key

Page 345: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  345  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lebanon Swatara Township Mill Street Park- Phase 3- Development

BRC-SC-19-51

$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)

$60,000.00 COMM_Key

Lebanon Swatara Township Mill Street Park- Phase 3- Development

BRC-SC-19-51

$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)

$60,000.00 COMM_Key

Lebanon Swatara Township Northern Lebanon Circuit Rider

BRC-TAG-19-199

$14,000.00 $14,000.00 19 Circuit Rider (COMM)

$76,685.00 COMM_Key

Lebanon Trout  Unlimited,  Doc  Fritchey  Chapter  

Rausch  Creek  Watershed  -­‐  Phase  I

BRC-­‐RCD-­‐14-­‐294

$20,100 $20,100 14 Development  (RIV)

$40,200 RIVER_Key

Lehigh Alburtis  Borough Playground  of  Adventure  II

BRC-­‐SC-­‐11-­‐106

$20,000 $29,000 11 Small  Communities/Small  Projects  (COMM)

$39,600 COMM_Key

Lehigh Allentown  City Cedar  Creek  Parkway BRC-­‐PRD-­‐13-­‐86

$377,500 $375,000 13 Park  Rehabilitation  and  Development  (COMM)

$755,100 COMM_Key

Lehigh Allentown  City East  Side  Trail BRC-­‐PRD-­‐13.3-­‐334

$125,000 $125,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$250,000 COMM_Key

Lehigh Allentown  City Jackson  Street  Community  Park  -­‐  Development

BRC-­‐PRD-­‐16-­‐118

$100,000 $100,000 16 Park  Rehabilitation  and  Development  (COMM)

$350,000 COMM_Key

Page 346: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  346  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lehigh Allentown  City Jordan  Creek  Greenway  -­‐  Development

BRC-­‐PRD-­‐17-­‐101

$385,459 $350,000 17 Park  Rehabilitation  and  Development  (COMM)

$778,459 COMM_Key

Lehigh Allentown  City Jordan  Meadows  Park

KEY-­‐PRD-­‐2-­‐2

$60,000 $60,000 2 Park  Rehabilitation  and  Development  (COMM)

$125,000 COMM_Key

Lehigh Allentown  City Keck  Park BRC-­‐PRD-­‐14-­‐109

$400,000 $250,000 14 Park  Rehabilitation  and  Development  (COMM)

$808,000 COMM_Key

Lehigh Allentown  City Lake  Muhlenberg  Restoration  Feasibility  Study

BRC-­‐RCI-­‐18-­‐166

$20,232 $19,600 18 Implementation  (RIV)

$45,220 COMM_Key

Lehigh Allentown  City Martin  Luther  King  &  Little  Lehigh  Parkway  Trail

BRC-­‐PRD-­‐16-­‐119

$350,000 $350,000 16 Park  Rehabilitation  and  Development  (COMM)

$900,000 COMM_Key

Lehigh Allentown  City Pool  Feasibility  Study BRC-­‐TAG-­‐13-­‐175

$40,000 $40,000 13 Feasibility  Studies  (COMM)

$80,000 COMM_Key

Lehigh Allentown  City Restoring  Nature  to  Jordan  Creek

BRC-­‐RCD-­‐18-­‐164

$40,100 $40,100 18 Development  (RIV)

$137,830 COMM_Key

Page 347: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  347  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lehigh Allentown  City Stevens  Park  -­‐  Development

BRC-­‐PRD-­‐17-­‐100

$250,000 $250,000 17 Park  Rehabilitation  and  Development  (COMM)

$500,000 COMM_Key

Lehigh Allentown  City Trail  Study BRC-­‐TAG-­‐13-­‐176

$50,000 $50,000 13 Trail  Study  (COMM)

$100,000 COMM_Key

Lehigh Catasauqua  Borough Community  Swimming  Pool

KEY-­‐PRD-­‐2-­‐24

$258,900 $250,000 2 Park  Rehabilitation  and  Development  (COMM)

$517,800 COMM_Key

Lehigh Catasauqua  Borough D&L  Trail  -­‐  Race  Street  to  Kimmett’s  Lock  -­‐  Development

BRC-­‐PRD-­‐17-­‐206

$75,000 $75,000 17 Park  Rehabilitation  and  Development  (COMM)

$375,000 COMM_Key

Lehigh Emmaus  Borough Swimming  Pool KEY-­‐PRD-­‐1-­‐47

$20,840 $20,800 1 Park  Rehabilitation  and  Development  (COMM)

$41,680 COMM_Key

Lehigh Fountain  Hill  Borough

Dodson  Street  Property  Acquisition

BRC-­‐ACQ-­‐12-­‐76

$102,600 $102,600 12 Acquisition  (COMM)

$205,200 COMM_Key

Lehigh Fountain  Hill  Borough

Stanley  Avenue  Recreation  Area

BRC-­‐PRD-­‐6-­‐67

$99,000 $99,000 6 Park  Rehabilitation  and  Development  (COMM)

$203,520 COMM_Key

Page 348: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  348  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lehigh Fountain  Hill  Borough

Stanley  Avenue  Recreation  Area  -­‐  Phase  9  Improve.

BRC-­‐SC-­‐9-­‐78

$39,400 $39,000 9 Small  Communities/Small  Projects  (COMM)

$59,400 COMM_Key

Lehigh Fountain  Hill  Borough

Stanley  Avenue  Recreation  Area  Master  Plan

KEY-­‐TAG-­‐4-­‐60

$13,900 $13,900 4 Master  Site  Plans  (COMM)

$27,800 COMM_Key

Lehigh Fountain  Hill  Borough

Stanley  Avenue  Recreation  Area  Phase  5  Improvement

BRC-­‐PRD-­‐8-­‐71

$74,900 $74,000 8 Park  Rehabilitation  and  Development  (COMM)

$149,800 COMM_Key

Lehigh Fountain  Hill  Borough

Swimming  Pool  Feasibility  Study

BRC-­‐TAG-­‐14-­‐207

$13,100 $13,100 14 Feasibility  Studies  (COMM)

$26,200 COMM_Key

Lehigh Lehigh  County Cedar  Creek  Parkway  West  Master  Site  Plan

BRC-­‐TAG-­‐14-­‐214

$20,000 $20,000 14 Master  Site  Plans  (COMM)

$40,000 COMM_Key

Lehigh Lehigh  County Cedar  Creek  Parkway  West-­‐  Phase  1-­‐Development

BRC-­‐PRD-­‐18-­‐81

$196,697 $197,000 18 Park  Rehabilitation  and  Development  (COMM)

$393,394 COMM_Key

Lehigh Lehigh County Cedar Creek Pedestrian Bridge Development

BRC-RCD-19-158

$65,000.00 $60,000.00 19 Development (RIV)

$130,000.00 COMM_Key

Lehigh Lehigh County Cedar Creek Pedestrian Bridge Development

BRC-RCD-19-158

$65,000.00 $60,000.00 19 Development (RIV)

$130,000.00 COMM_Key

Lehigh Lehigh County Cedar Creek Pedestrian Bridge Development

BRC-RCD-19-158

$65,000.00 $60,000.00 19 Development (RIV)

$130,000.00 COMM_Key

Page 349: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  349  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lehigh Lehigh  County Delaware  &  Lehigh  Trail  Development  Phase  2

BRC-­‐PRD-­‐16-­‐8

$265,000 $84,300 16 Park  Rehabilitation  and  Development  (COMM)

$530,000 COMM_Key

Lehigh Lehigh  County Game  Preserve  Renovations

KEY-­‐ZOO-­‐94-­‐2

$215,000 $215,000 1 Zoo $430,000 COMM_Key

Lehigh Lehigh  County Jordan  Creek  Greenway  -­‐  Segments  22-­‐25  -­‐  Development

BRC-­‐PRD-­‐18-­‐176

$160,000 $100,000 18 Park  Rehabilitation  and  Development  (COMM)

$200,000 COMM_Key

Lehigh Lehigh County Jordan Creek Parkway Master Site Plan

BRC-TAG-19-135

$30,003.00 $30,000.00 19 Master Site Plans (COMM)

$60,006.00 COMM_Key

Lehigh Lehigh County Jordan Creek Parkway Master Site Plan

BRC-TAG-19-135

$30,003.00 $30,000.00 19 Master Site Plans (COMM)

$60,006.00 COMM_Key

Lehigh Lehigh County Jordan Creek Parkway Master Site Plan

BRC-TAG-19-135

$30,003.00 $30,000.00 19 Master Site Plans (COMM)

$60,006.00 COMM_Key

Lehigh Lehigh County Jordan Creek Parkway Master Site Plan

BRC-TAG-19-135

$30,003.00 $30,000.00 19 Master Site Plans (COMM)

$60,006.00 COMM_Key

Lehigh Lehigh  County Lehigh  County  Parks-­‐  Eight  Sites

BRC-­‐PRD-­‐14-­‐148

$18,900 $18,900 14 Park  Rehabilitation  and  Development  (COMM)

$54,200 COMM_Key

Page 350: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  350  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lehigh Lehigh  County Lehigh  County  Sports  Fields

BRC-­‐PRD-­‐6-­‐96

$175,000 $175,000 6 Park  Rehabilitation  and  Development  (COMM)

$409,000 COMM_Key

Lehigh Lehigh  County Lehigh  Mountain  Acquisition

BRC-­‐ACQ-­‐11.5-­‐8

$458,500 $200,000 11.5 Acquisition  (COMM)

$917,000 COMM_Key

Lehigh Lehigh  County Lehigh  Mountain  Park  -­‐  Phase  1-­‐  Development

BRC-­‐PRD-­‐17-­‐131

$25,000 $25,000 17 Park  Rehabilitation  and  Development  (COMM)

$50,002 COMM_Key

Lehigh Lehigh  County Natural  Areas  Inventory

KEY-­‐TAG-­‐2-­‐81

$39,984 $39,900 2 Natural  Areas  Inventories  (COMM)

$84,984 COMM_Key

Lehigh Lehigh  County Planning  Block  Grant BRC-­‐TAG-­‐11.5-­‐25

$165,000 $140,000 11.5 Education  and  Training  (COMM)

$330,000 COMM_Key

Lehigh Lehigh  County Trexler  Nature  Preserve  Environmental  Center

BRC-­‐PRD-­‐13.6-­‐572

$245,000 $420,000 13.6 Park  Rehabilitation  and  Development  (COMM)

$750,000 COMM_Key

Lehigh Lehigh  County Trexler-­‐Lehigh  Co.Game  Preserve

KEY-­‐PRD-­‐3-­‐114

$250,000 $225,000 3 Park  Rehabilitation  and  Development  (COMM)

$929,000 COMM_Key

Page 351: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  351  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lehigh Lehigh  County Velodrome KEY-­‐PRD-­‐2-­‐80

$1,200,000 $250,000 2 Park  Rehabilitation  and  Development  (COMM)

$2,729,376 COMM_Key

Lehigh Lehigh  Valley  Planning  Commission  

Greenways  Plan BRC-­‐TAG-­‐9-­‐114

$72,950 $72,950 9 Greenway  Plans  (COMM)

$145,900 COMM_Key

Lehigh Lower  Macungie  Township

Camp  Olympic  Master  Site  Plan

BRC-­‐TAG-­‐14-­‐216

$60,500 $60,500 14 Master  Site  Plans  (COMM)

$121,000 COMM_Key

Lehigh Lower  Macungie  Township

Camp  Olympic  Park  -­‐  Development

BRC-­‐PRD-­‐17-­‐134

$60,000 $60,000 17 Park  Rehabilitation  and  Development  (COMM)

$120,000 COMM_Key

Lehigh Lower  Macungie  Township

Comprehensive  Recreation,  Open  Space  &  Greenway  Plan

BRC-­‐TAG-­‐15-­‐96

$40,000 $80,000 15 Greenway  Plans  (COMM)

$80,000 COMM_Key

Lehigh Lower Macungie Township

Lower Macungie Township Greenway Trail Links – Development

BRC-PRD-19-92

$200,000.00 $125,000.00 19 Park Rehabilitation and Development (COMM)

$250,035.00 COMM_Key

Lehigh Lower Macungie Township

Lower Macungie Township Greenway Trail Links – Development

BRC-PRD-19-92

$200,000.00 $125,000.00 19 Park Rehabilitation and Development (COMM)

$250,035.00 COMM_Key

Page 352: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  352  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lehigh Lower Macungie Township

Lower Macungie Township Greenway Trail Links – Development

BRC-PRD-19-92

$200,000.00 $125,000.00 19 Park Rehabilitation and Development (COMM)

$250,035.00 COMM_Key

Lehigh Lynn  Township Ontelaunee  Park BRC-­‐SC-­‐11-­‐135

$33,600 $33,000 11 Small  Communities/Small  Projects  (COMM)

$53,600 COMM_Key

Lehigh Lynn  Township Ontelaunee  Park  Swimming  Pool

BRC-­‐TAG-­‐7-­‐113

$7,000 $7,000 7 Feasibility  Studies  (COMM)

$14,000 COMM_Key

Lehigh Lynn  Township Ontelaunee  Park/Trail

BRC-­‐ACQ-­‐6-­‐102

$180,400 $180,000 6 Acquisition  (COMM)

$435,800 COMM_Key

Lehigh North  Whitehall  Township

Levans  Road  Recreation  Area  Expansion

BRC-­‐ACQ-­‐7-­‐141

$150,000 $150,000 7 Acquisition  (COMM)

$446,500 COMM_Key

Lehigh North  Whitehall  Township

Minnich  Tract KEY-­‐ACQ-­‐3-­‐158

$100,000 $100,000 3 Acquisition  (COMM)

$280,000 COMM_Key

Lehigh North  Whitehall  Township

Neffs  Valley  Park  Acquisition

BRC-­‐ACQ-­‐12.5-­‐18

$250,000 $250,000 12.5 Acquisition  (COMM)

$545,000 COMM_Key

Lehigh North  Whitehall  Township

Paranchok  Park BRC-­‐PRD-­‐9-­‐154

$200,000 $150,000 9 Park  Rehabilitation  and  Development  (COMM)

$512,000 COMM_Key

Lehigh North  Whitehall  Township

Recreation  Park-­‐Development

BRC-­‐PRD-­‐17-­‐143

$55,280 $55,200 17 Park  Rehabilitation  and  Development  (COMM)

$110,560 COMM_Key

Page 353: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  353  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lehigh North  Whitehall  Township

Schlechter  Property  Acquisition

BRC-­‐ACQ-­‐16-­‐25

$39,300 $37,300 16 Acquisition  (COMM)

$78,600 COMM_Key

Lehigh North  Whitehall  Township

Schnecksville  Park KEY-­‐PRD-­‐5-­‐151

$150,000 $125,000 5 Park  Rehabilitation  and  Development  (COMM)

$558,660 COMM_Key

Lehigh North  Whitehall  Township

Township  Park KEY-­‐ACQ-­‐1-­‐100

$101,500 $71,000 1 Acquisition  (COMM)

$203,000 COMM_Key

Lehigh Salisbury  Township Franko  Farm  -­‐  Phase  III

KEY-­‐PRD-­‐3-­‐190

$100,000 $100,000 3 Park  Rehabilitation  and  Development  (COMM)

$220,000 COMM_Key

Lehigh Salisbury  Township Franko  Farm  Recreation  Area

KEY-­‐PRD-­‐1-­‐121

$100,000 $50,000 1 Park  Rehabilitation  and  Development  (COMM)

$200,000 COMM_Key

Lehigh Salisbury Township Lindberg Park - Development

BRC-PRD-19-111

$177,000.00 $177,000.00 19 Park Rehabilitation and Development (COMM)

$425,620.00 COMM_Key

Lehigh Salisbury Township Lindberg Park - Development

BRC-PRD-19-111

$177,000.00 $177,000.00 19 Park Rehabilitation and Development (COMM)

$425,620.00 COMM_Key

Page 354: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  354  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lehigh Salisbury Township Lindberg Park - Development

BRC-PRD-19-111

$177,000.00 $177,000.00 19 Park Rehabilitation and Development (COMM)

$425,620.00 COMM_Key

Lehigh Salisbury Township Lindberg Park - Development

BRC-PRD-19-111

$177,000.00 $177,000.00 19 Park Rehabilitation and Development (COMM)

$425,620.00 COMM_Key

Lehigh Salisbury  Township Lindberg  Park  Master  Site  Plan

BRC-­‐TAG-­‐17-­‐20

$22,400 $22,400 17 Master  Site  Plans  (COMM)

$44,800 COMM_Key

Lehigh Slatington  Borough Main  Street  Park  Development

BRC-­‐SC-­‐12-­‐123

$40,000 $40,000 12 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Lehigh Slatington  Borough Roosevelt  Park KEY-­‐PRD-­‐2-­‐140

$37,710 $37,700 2 Park  Rehabilitation  and  Development  (COMM)

$78,500 COMM_Key

Lehigh Slatington  Borough Slate  Heritage  Rail  Trail

BRC-­‐SC-­‐11-­‐155

$39,800 $39,000 11 Small  Communities/Small  Projects  (COMM)

$59,700 COMM_Key

Lehigh Slatington  Borough Victory  Park KEY-­‐SC-­‐5-­‐183

$20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$20,650 COMM_Key

Lehigh South  Whitehall  Township

Covered  Bridge  Park  Master  Site  Plan

BRC-­‐TAG-­‐17-­‐22

$30,000 $30,000 17 Feasibility  Studies  (COMM)

$60,000 COMM_Key

Page 355: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  355  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lehigh South Whitehall Township

Jordan Creek Greenway – Segments 48-50 – Development

BRC-PRD-19-118

$756,472.00 $250,000.00 19 Park Rehabilitation and Development (COMM)

$1,506,472.00 COMM_Key

Lehigh South Whitehall Township

Jordan Creek Greenway – Segments 48-50 – Development

BRC-PRD-19-118

$756,472.00 $250,000.00 19 Park Rehabilitation and Development (COMM)

$1,506,472.00 COMM_Key

Lehigh South Whitehall Township

Jordan Creek Greenway – Segments 48-50 – Development

BRC-PRD-19-118

$756,472.00 $250,000.00 19 Park Rehabilitation and Development (COMM)

$1,506,472.00 COMM_Key

Lehigh South  Whitehall  Township

Park,  Recreation  &  Open  Space  Plan

BRC-­‐TAG-­‐12-­‐261

$22,500 $22,500 12 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$45,000 COMM_Key

Lehigh Upper  Macungie  Township

Grange  Road  Park  -­‐  Development

BRC-­‐PRD-­‐16-­‐164

$122,105 $122,000 16 Park  Rehabilitation  and  Development  (COMM)

$244,210 COMM_Key

Lehigh Upper  Macungie  Township

Upper  Macungie  Park

KEY-­‐ACQ-­‐3-­‐224

$340,000 $200,000 3 Acquisition  (COMM)

$680,000 COMM_Key

Lehigh Upper  Saucon  Township

Community  Park  Master  Site  Plan

BRC-­‐TAG-­‐18-­‐152

$25,000 $25,000 18 Master  Site  Plans  (COMM)

$50,000 COMM_Key

Lehigh Upper  Saucon  Township

Haring  and  Curly  Horse  Parks  Master  Site  Plan

BRC-­‐TAG-­‐17-­‐26

$50,000 $50,000 17 Master  Site  Plans  (COMM)

$100,000 COMM_Key

Page 356: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  356  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lehigh Upper  Saucon  Township

Saucon  Valley  Rail  Trail  -­‐  Saucon  Township  Community  Park  –  Development

BRC-­‐PRD-­‐18-­‐104

$32,500 $32,500 18 Park  Rehabilitation  and  Development  (COMM)

$65,000 COMM_Key

Lehigh Washington  Township

Eagle's  Nest  Environmental  Center

BRC-­‐PRD-­‐7-­‐200

$85,000 $85,000 7 Park  Rehabilitation  and  Development  (COMM)

$236,400 COMM_Key

Lehigh Washington  Township

Eagle's  Nest  Park KEY-­‐ACQ-­‐2-­‐169

$46,000 $46,000 2 Acquisition  (COMM)

$100,618 COMM_Key

Lehigh Washington  Township

Eagle's  Nest  Park  -­‐  Phase  II

KEY-­‐PRD-­‐5-­‐215

$94,500 $94,500 5 Park  Rehabilitation  and  Development  (COMM)

$189,000 COMM_Key

Lehigh Washington  Township

Schuylkill  &  Lehigh  Rail  Trail

BRC-­‐RTP-­‐7-­‐18

$45,000 $30,000 7 Master  Plans  (RT)

$90,000 RT_Key

Lehigh Washington  Township

Schuylkill  and  Lehigh  Rail-­‐Trail

KEY-­‐RTA-­‐5-­‐22

$18,426 $18,400 5 Acquisition  (RT) $36,852 RT_Key

Lehigh Washington  Township

Slate  Heritage  Trail  Construction  -­‐  Phase  I

BRC-­‐RTD-­‐11-­‐13

$179,200 $140,000 11 Rail  Rehabilitation  and  Development  (RT)

$308,500 RIVER_Key

Page 357: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  357  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lehigh Whitehall  Township Ironton  Rail  Trail  -­‐  Stair  Access  &  Picnic  Area

BRC-­‐RTD-­‐13.3-­‐504

$20,700 $20,000 13.3 Rail  Rehabilitation  and  Development  (RT)

$41,300 RT_Key

Lehigh Whitehall  Township Ironton  Rail  Trail  Improvements

BRC-­‐RTD-­‐11-­‐14

$40,400 $40,000 11 Rail  Rehabilitation  and  Development  (RT)

$80,800 RT_Key

Lehigh Whitehall  Township Ironton  Rail  Trail  Spur  Paving

BRC-­‐PRD-­‐18-­‐180

$180,173 $123,800 18 Park  Rehabilitation  and  Development  (COMM)

$247,611 COMM_Key

Lehigh Whitehall  Township Ironton  Rail-­‐Trail BRC-­‐RTD-­‐7-­‐19

$72,000 $55,000 7 Rail  Rehabilitation  and  Development  (RT)

$110,000 RT_Key

Lehigh Whitehall  Township Ironton  Rail-­‐Trail KEY-­‐RTD-­‐3-­‐26

$14,500 $14,500 3 Rail  Rehabilitation  and  Development  (RT)

$29,500 RT_Key

Lehigh Whitehall  Township Ironton  Rail-­‐Trail KEY-­‐RTD-­‐5-­‐23

$180,000 $40,000 5 Rail  Rehabilitation  and  Development  (RT)

$360,000 RT_Key

Page 358: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  358  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lehigh Whitehall  Township Ironton  Rail-­‐Trail  Improvements

BRC-­‐RTD-­‐10-­‐17

$36,230 $35,000 10 Rail  Rehabilitation  and  Development  (RT)

$73,000 RT_Key

Lehigh Whitehall  Township Ironton  Railroad  Trail KEY-­‐RTA-­‐95-­‐20

$52,500 $52,500 1 Acquisition  (RT) $262,500 RT_Key

Lehigh Whitehall  Township Jordan  Creek  Greenway-­‐Phase  1

BRC-­‐PRD-­‐16-­‐167

$250,000 $230,000 16 Park  Rehabilitation  and  Development  (COMM)

$587,160 COMM_Key

Lehigh Wildlands  Conservancy,  Inc.  

Camp  Olympic  Acquisition

BRC-­‐LTA-­‐13-­‐28

$300,000 $300,000 13 Open  Space  Acquisition  (LT)

$958,000 LT_Key

Lehigh Wildlands  Conservancy,  Inc.  

DeAngelis  Property  Acquisition

BRC-­‐LTA-­‐18-­‐23

$21,000 $21,000 18 Open  Space  Acquisition  (LT)

$42,000 LT_Key

Lehigh Wildlands  Conservancy,  Inc.  

Hersh  Property  Acquisition

BRC-­‐LTA-­‐12.5-­‐13

$32,500 $32,000 12.5 Open  Space  Acquisition  (LT)

$65,000 LT_Key

Lehigh Wildlands  Conservancy,  Inc.  

Jordan  Creek  Watershed  Assesment

KEY-­‐RCP-­‐96-­‐02

$65,000 $65,000 3 Planning  (RIV) $130,000 RIVER_Key

Lehigh Wildlands  Conservancy,  Inc.  

Native  habitat  restoration  and  education  in  an  urban  park

BRC-­‐RCD-­‐16-­‐180

$47,640 $48,800 16 Development  (RIV)

$97,620 RIVER_Key

Lehigh Wildlands  Conservancy,  Inc.  

Nature  Center  Renovations

KEY-­‐ZOO-­‐94-­‐7

$35,000 $35,000 1 Zoo $70,000 COMM_Key

Page 359: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  359  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lehigh Wildlands  Conservancy,  Inc.  

Persing  Property  Acquisition

BRC-­‐LTA-­‐18-­‐25

$84,250 $76,700 18 Open  Space  Acquisition  (LT)

$168,500 LT_Key

Lehigh Wildlands  Conservancy,  Inc.  

Restoring  Nature  to  Trexler  Nature  Preserve

BRC-­‐RCI-­‐17-­‐170

$30,000 $30,000 17 Implementation  (RIV)

$62,001 RIVER_Key

Lehigh,  Northampton

Bethlehem  City Johnston  Park  Restoration

BRC-­‐RCD-­‐9-­‐2

$125,000 $125,000 9 Development  (RIV)

$250,000 RIVER_Key

Lehigh,  Northampton

Lehigh  County TreeVitalize  Lehigh  Valley

BRC-­‐TV-­‐14-­‐4

$200,000 $262,000 14 Park  Rehabilitation  and  Development  (COMM)

$600,000 COMM_Key

Lehigh,  Northampton

Lehigh  Valley  Planning  Commission  

Lehigh  Valley  Conservation  Greenways  Analysis

BRC-­‐TAG-­‐16-­‐61

$80,000 $30,000 16 Natural  Areas  Inventories  (COMM)

$160,000 COMM_Key

Lehigh,  Northampton

Upper  Saucon  Township

Upper  and  Lower  Saucon  Twp.  Joint  Rec  &  Pk  Plan

BRC-­‐TAG-­‐9-­‐215

$27,500 $27,000 9 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$55,000 COMM_Key

Luzerne Anthracite  Scenic  Trails  Association  

Back  Mountain  Trail BRC-­‐RTD-­‐8-­‐20

$90,000 $27,000 8 Rail  Rehabilitation  and  Development  (RT)

$660,000 RT_Key

Luzerne Ashley  Borough Bobby  Strish  Memorial  Park

KEY-­‐PRD-­‐4-­‐10

$25,000 $25,000 4 Park  Rehabilitation  and  Development  (COMM)

$50,000 COMM_Key

Page 360: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  360  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Luzerne Avoca  Borough L  &  L  Railroad  Parcel  Acquisition

BRC-­‐ACQ-­‐13.3-­‐272

$12,400 $12,300 13.3 Acquisition  (COMM)

$24,800 COMM_Key

Luzerne Avoca  Borough Plane  Street  Park KEY-­‐SC-­‐5-­‐10 $15,100 $15,100 5 Small  Communities/Small  Projects  (COMM)

$21,000 COMM_Key

Luzerne Avoca  Borough West  Avoca  Park BRC-­‐SC-­‐13.3-­‐289

$19,900 $20,000 13.3 Small  Communities/Small  Projects  (COMM)

$19,900 COMM_Key

Luzerne Black  Creek  Township

Community  Park  Enhancement

BRC-­‐SC-­‐12-­‐84

$25,000 $25,000 12 Small  Communities/Small  Projects  (COMM)

$30,000 COMM_Key

Luzerne Butler  Township Beltrami  Land  Acquision  -­‐  (Recreation  Complex)

BRC-­‐ACQ-­‐13.6-­‐579

$452,500 $250,000 13.6 Acquisition  (COMM)

$905,000 COMM_Key

Luzerne Butler  Township Butler  Community  Park-­‐Phase  II

BRC-­‐PRD-­‐7-­‐30

$84,019 $84,000 7 Park  Rehabilitation  and  Development  (COMM)

$192,609 COMM_Key

Luzerne Butler  Township Community  Park-­‐Phase  I

KEY-­‐PRD-­‐2-­‐22

$99,000 $99,000 2 Park  Rehabilitation  and  Development  (COMM)

$198,000 COMM_Key

Page 361: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  361  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Luzerne Butler Township Freedom Park - Phase 1– Development

BRC-PRD-19-64

$440,400.00 $200,000.00 19 Park Rehabilitation and Development (COMM)

$880,800.00 COMM_Key

Luzerne Butler Township Freedom Park - Phase 1– Development

BRC-PRD-19-64

$440,400.00 $200,000.00 19 Park Rehabilitation and Development (COMM)

$880,800.00 COMM_Key

Luzerne Butler Township Freedom Park - Phase 1– Development

BRC-PRD-19-64

$440,400.00 $200,000.00 19 Park Rehabilitation and Development (COMM)

$880,800.00 COMM_Key

Luzerne Butler  Township Trail  Development  -­‐  Phase  IA

BRC-­‐PRD-­‐13-­‐341

$30,000 $60,000 13 Park  Rehabilitation  and  Development  (COMM)

$120,000 COMM_Key

Luzerne Conyngham  Borough Conyngham  Valley  Nature  Park-­‐  Rehabilitation

BRC-­‐SC-­‐15-­‐76

$40,000 $40,000 15 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Luzerne Dallas  Borough Kenneth  Young  Memorial  Park  -­‐  Master  Site  Plan

BRC-­‐TAG-­‐12-­‐233

$18,000 $18,000 12 Master  Site  Plans  (COMM)

$36,000 COMM_Key

Luzerne Dorrance  Township Recreation  Area KEY-­‐SC-­‐3-­‐49 $8,700 $9,000 3 Small  Communities/Small  Projects  (COMM)

$9,300 COMM_Key

Page 362: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  362  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Luzerne Dupont  Borough Little  League  Park  Renovation

BRC-­‐SC-­‐12-­‐90

$20,200 $20,200 12 Small  Communities/Small  Projects  (COMM)

$40,400 COMM_Key

Luzerne Duryea  Borough Community  Park BRC-­‐SC-­‐14-­‐81

$40,000 $40,000 14 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Luzerne Exeter  Borough Peer-­‐to-­‐Peer BRC-­‐TAG-­‐10-­‐7

$7,500 $7,500 10 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$8,250 COMM_Key

Luzerne Exeter  Borough West  Side  Trail  -­‐  Phase  1

BRC-­‐PRD-­‐9-­‐73

$72,408 $70,000 9 Park  Rehabilitation  and  Development  (COMM)

$419,559 COMM_Key

Luzerne Exeter  Borough West  Side  Trail  Project

BRC-­‐TAG-­‐7-­‐69

$34,287 $34,000 7 Greenway  Plans  (COMM)

$68,574 COMM_Key

Luzerne Fairview  Township Memorial  Park KEY-­‐SC-­‐4-­‐56 $20,000 $20,000 4 Small  Communities/Small  Projects  (COMM)

$22,089 COMM_Key

Luzerne Fairview  Township Memorial  Park  Master  Site  Plan

BRC-­‐TAG-­‐17-­‐7

$8,000 $8,000 17 Master  Site  Plans  (COMM)

$15,998 COMM_Key

Luzerne Foster  Township Upper  Lehigh  Park-­‐Developmemt

BRC-­‐SC-­‐18-­‐31

$40,000 $40,000 18 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Page 363: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  363  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Luzerne Freeland  Borough 4th  Ward  Playground  Renovations

BRC-­‐SC-­‐12-­‐97

$25,000 $30,000 12 Small  Communities/Small  Projects  (COMM)

$40,000 COMM_Key

Luzerne Freeland  Borough Celentano  Land  Acquisition

BRC-­‐ACQ-­‐13.6-­‐582

$10,650 $10,600 13.6 Acquisition  (COMM)

$21,300 COMM_Key

Luzerne Freeland  Borough Front  Street  Park KEY-­‐SC-­‐5-­‐71 $20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$21,220 COMM_Key

Luzerne Greater  Hazleton  Area  Civic  Partnership  

Ashmore  Pedestrian  Bridge

BRC-­‐RTD-­‐13.3-­‐367

$35,200 $35,200 13.3 Park  Rehabilitation  and  Development  (COMM)

$266,200 RT_Key

Luzerne Greater  Hazleton  Area  Civic  Partnership  

Gr.  Hazleton  Rails-­‐to-­‐Trails  Master  Plan-­‐Phase  2/3

BRC-­‐RTP-­‐11-­‐7

$35,000 $35,000 11 Master  Plans  (RT)

$70,000 RT_Key

Luzerne Greater  Hazleton  Area  Civic  Partnership  

Greater  Hazleton  Area  Rail-­‐Trail  Development

BRC-­‐RTD-­‐11-­‐6

$31,700 $31,700 11 Rail  Rehabilitation  and  Development  (RT)

$63,400 RT_Key

Luzerne Greater  Hazleton  Area  Civic  Partnership  

Greater  Hazleton  Rails-­‐to-­‐Trails  -­‐  Phase  II

BRC-­‐RTD-­‐14-­‐279

$295,200 $295,200 14 Rail  Rehabilitation  and  Development  (RT)

$590,400 RT_Key

Luzerne Greater  Hazleton  Area  Civic  Partnership  

Hazleton-­‐Eckley  Trail BRC-­‐RTP-­‐7-­‐6

$35,000 $37,500 7 Feasibility  Studies  (RT)

$76,000 RT_Key

Page 364: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  364  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Luzerne Hazleton  City Helping  Hands  Playground

KEY-­‐PRD-­‐1-­‐59

$150,000 $110,000 1 Park  Rehabilitation  and  Development  (COMM)

$327,100 COMM_Key

Luzerne Hollenback  Township

Hollenback  Township  Community  Park-­‐Development

BRC-­‐SC-­‐18-­‐34

$19,994 $20,000 18 Small  Communities/Small  Projects  (COMM)

$33,671 COMM_Key

Luzerne Hunlock  Township Municipal  Park  Master  Site  Plan

BRC-­‐TAG-­‐14-­‐211

$15,000 $15,000 14 Master  Site  Plans  (COMM)

$30,000 COMM_Key

Luzerne Jackson  Township Recreation  Area BRC-­‐SC-­‐14-­‐90

$37,100 $37,100 14 Small  Communities/Small  Projects  (COMM)

$51,200 COMM_Key

Luzerne Jenkins  Township May  Park KEY-­‐SC-­‐3-­‐98 $20,000 $20,000 3 Small  Communities/Small  Projects  (COMM)

$53,000 COMM_Key

Luzerne Kingston  Municipality

Master  Site  Development  Plan

KEY-­‐TAG-­‐1-­‐66

$10,000 $10,000 1 Master  Site  Plans  (COMM)

$20,000 COMM_Key

Luzerne Laflin  Borough Borough  Park KEY-­‐SC-­‐3-­‐103

$19,200 $19,200 3 Small  Communities/Small  Projects  (COMM)

$19,200 COMM_Key

Luzerne Laflin  Borough Pavilion  Improvements

BRC-­‐SC-­‐11-­‐132

$20,000 $20,000 11 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Page 365: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  365  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Luzerne Luzerne  Borough Borough  Recreation  Complex

KEY-­‐SC-­‐3-­‐123

$61,000 $20,000 3 Small  Communities/Small  Projects  (COMM)

$122,000 COMM_Key

Luzerne Luzerne  County Greenway  Plan KEY-­‐TAG-­‐3-­‐124

$50,000 $50,000 3 Greenway  Plans  (COMM)

$100,000 COMM_Key

Luzerne Luzerne  County Luzerne  County  Recreation  Complex

BRC-­‐PRD-­‐9-­‐125

$112,300 $110,000 9 Park  Rehabilitation  and  Development  (COMM)

$224,600 COMM_Key

Luzerne Luzerne  County Moon  Lake  Park  Improvements

BRC-­‐PRD-­‐11-­‐53

$107,800 $100,000 11 Park  Rehabilitation  and  Development  (COMM)

$215,600 COMM_Key

Luzerne Luzerne  County Moon  Lake  Park  Master  Plan/Feasibility  Study

BRC-­‐TAG-­‐14-­‐218

$40,000 $60,000 14 Master  Site  Plans  (COMM)

$80,000 COMM_Key

Luzerne Luzerne  County Natural  Areas  Inventory

KEY-­‐TAG-­‐5-­‐119

$42,500 $42,500 5 Natural  Areas  Inventories  (COMM)

$85,000 COMM_Key

Luzerne Luzerne  County Nesbitt  Park BRC-­‐PRD-­‐13-­‐120

$400,000 $400,000 13 Park  Rehabilitation  and  Development  (COMM)

$800,000 COMM_Key

Luzerne Luzerne  County Theta  Lands/  Crystal  Lake  Acquisition

BRC-­‐ACQ-­‐8-­‐109

$733,000 $280,000 8 Acquisition  (COMM)

$1,500,000 COMM_Key

Page 366: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  366  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Luzerne Luzerne  County  Redevelopment  Authority  

Knox  Mine  Disaster  Park

BRC-­‐PRD-­‐13.3-­‐390

$9,500 $10,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$63,500 COMM_Key

Luzerne Nanticoke  City Comprehensive  Rec.,  Park  and  Open  Space  Plan

KEY-­‐TAG-­‐5-­‐140

$25,000 $25,000 5 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$50,000 COMM_Key

Luzerne Nanticoke  City Greater  Nanticoke  Area  Park  -­‐  Development

BRC-­‐PRD-­‐17-­‐142

$60,485 $60,400 17 Park  Rehabilitation  and  Development  (COMM)

$120,970 COMM_Key

Luzerne Natural  Lands  Trust,  Inc.  

Haas  Property  Acquisition  -­‐  Bear  Creek  Preserve

BRC-­‐LTA-­‐12-­‐25

$1,731,000 $1,731,000 12 Open  Space  Acquisition  (LT)

$3,462,000 LT_Key

Luzerne North  Branch  Land  Trust  

American  Legion  Conservation  Easement

BRC-­‐LTA-­‐13-­‐29

$555,700 $553,000 13 Critical  Habitat  Acquisition  (LT)

$1,111,400 LT_Key

Luzerne North  Branch  Land  Trust  

Bear  Creek  Camp  Easement

BRC-­‐LTA-­‐13-­‐30

$1,593,400 $1,593,300 13 Critical  Habitat  Acquisition  (LT)

$3,186,700 LT_Key

Luzerne North  Branch  Land  Trust  

Bear  Creek  Lake  View  Acquisition

BRC-­‐LTA-­‐16-­‐34

$251,250 $251,000 16 Open  Space  Acquisition  (LT)

$502,500 LT_Key

Luzerne North  Branch  Land  Trust  

Butler  Enterprises  Land  Acquisition

BRC-­‐LTA-­‐16-­‐35

$282,000 $282,000 16 Open  Space  Acquisition  (LT)

$564,000 LT_Key

Page 367: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  367  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Luzerne North  Branch  Land  Trust  

CDR  Acquisition BRC-­‐LTA-­‐14-­‐40

$329,400 $328,000 14 Open  Space  Acquisition  (LT)

$658,800 LT_Key

Luzerne North Branch Land Trust

Earth Conservancy at Mocanaqua Fee Acquisition

BRC-LTA-19-207

########## ########## 19 Open Space Acquisition (LT)

$8,643,400.00 LT_Key

Luzerne North Branch Land Trust

Earth Conservancy at Mocanaqua Fee Acquisition

BRC-LTA-19-207

########## ########## 19 Open Space Acquisition (LT)

$8,643,400.00 LT_Key

Luzerne North Branch Land Trust

Earth Conservancy at Mocanaqua Fee Acquisition

BRC-LTA-19-207

########## ########## 19 Open Space Acquisition (LT)

$8,643,400.00 LT_Key

Luzerne North Branch Land Trust

Earth Conservancy at Mocanaqua Fee Acquisition

BRC-LTA-19-207

########## ########## 19 Open Space Acquisition (LT)

$8,643,400.00 LT_Key

Luzerne North Branch Land Trust

Earth Conservancy at Mocanaqua Fee Acquisition

BRC-LTA-19-207

########## ########## 19 Open Space Acquisition (LT)

$8,643,400.00 LT_Key

Luzerne North  Branch  Land  Trust  

Mack  Property  Acquisition

BRC-­‐LTA-­‐18-­‐15

$880,306 $850,000 18 Open  Space  Acquisition  (LT)

$1,760,613 LT_Key

Luzerne North  Branch  Land  Trust  

Valmont  Bog  Acquisition

BRC-­‐LTA-­‐16-­‐36

$364,050 $362,700 16 Open  Space  Acquisition  (LT)

$1,023,000 LT_Key

Luzerne Pennsylvania  Environmental  Council,  Inc.  

DL&W  Master  Development  Plan

KEY-­‐RTP-­‐95-­‐22

$25,000 $25,000 1 Master  Plans  (RT)

$50,000 RT_Key

Luzerne Pennsylvania  Environmental  Council,  Inc.  

The  Lands  at  Hillside  Invasive  Species  Removal  Project

BRC-­‐RCD-­‐13-­‐8

$50,000 $50,000 13 Development  (RIV)

$100,000 RIVER_Key

Luzerne Pennsylvania  Environmental  Council,  Inc.  

Wyoming  Valley  Water  Trail

BRC-­‐RCP-­‐8-­‐28

$32,500 $25,000 8 Planning  (RIV) $65,000 RIVER_Key

Page 368: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  368  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Luzerne Pittston  City Comprehensive,  Recreation,  Park  and  Open-­‐Space  Plan

BRC-­‐TAG-­‐12-­‐258

$12,000 $12,000 12 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$24,000 COMM_Key

Luzerne Pittston  City Duryea  to  Wilkes-­‐Barre  Master  Plan

KEY-­‐RTP-­‐4-­‐16

$24,000 $24,000 4 Master  Plans  (RT)

$48,000 RT_Key

Luzerne Pittston  City Peer-­‐to-­‐Peer KEY-­‐TAG-­‐3-­‐3

$7,500 $7,500 3 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$8,250 COMM_Key

Luzerne Pittston  City Riverfront  Park KEY-­‐PRD-­‐3-­‐175

$200,000 $200,000 3 Park  Rehabilitation  and  Development  (COMM)

$425,000 COMM_Key

Luzerne Plains  Township Municipal  Park BRC-­‐PRD-­‐6-­‐152

$25,000 $25,000 6 Park  Rehabilitation  and  Development  (COMM)

$50,000 COMM_Key

Luzerne Plains  Township Municipal  Park KEY-­‐PRD-­‐2-­‐127

$45,000 $45,000 2 Park  Rehabilitation  and  Development  (COMM)

$90,000 COMM_Key

Luzerne Plains  Township Municipal  Park KEY-­‐PRD-­‐3-­‐176

$27,500 $27,500 3 Park  Rehabilitation  and  Development  (COMM)

$55,000 COMM_Key

Page 369: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  369  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Luzerne Rice  Township Wapwallopen  Creek  Greenway  FS/MP

BRC-­‐TAG-­‐9-­‐175

$35,000 $25,000 9 Feasibility  Studies  (COMM)

$70,000 COMM_Key

Luzerne Shickshinny  Borough Borough  Playground  Renovation

BRC-­‐SC-­‐11-­‐154

$40,000 $40,000 11 Small  Communities/Small  Projects  (COMM)

$68,000 COMM_Key

Luzerne Shickshinny  Borough Crary  Park BRC-­‐PRD-­‐14-­‐170

$166,000 $156,000 14 Park  Rehabilitation  and  Development  (COMM)

$440,400 COMM_Key

Luzerne Sugarloaf  Township Joe  LaRock  Recreation  Complex

BRC-­‐SC-­‐10-­‐99

$39,800 $34,000 10 Small  Communities/Small  Projects  (COMM)

$65,900 COMM_Key

Luzerne Susquehanna  Warrior  Trail  Council  

Susquehanna  Warrior  Trail

BRC-­‐RTD-­‐6-­‐20

$748,990 $36,000 6 Rail  Rehabilitation  and  Development  (RT)

$1,497,980 RT_Key

Luzerne The  Conservation  Fund  

Theta  Lands:    Phase  II

BRC-­‐LTA-­‐11-­‐1

$1,100,000 $1,100,000 11 Open  Space  Acquisition  (LT)

$2,800,000 LT_Key

Luzerne The  Nature  Conservancy  

Arbutus/Basler  Acquisition

BRC-­‐LTA-­‐16-­‐38

$1,075,400 $643,000 16 Open  Space  Acquisition  (LT)

$2,150,800 LT_Key

Luzerne Tri-­‐Area  Joint  Recreation  Authority  

Peer-­‐to-­‐Peer KEY-­‐TAG-­‐6-­‐3

$7,500 $7,500 6 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$8,250 COMM_Key

Page 370: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  370  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Luzerne West  Hazleton  Borough

West  Hazleton  Sports  Complex

KEY-­‐SC-­‐2-­‐171

$20,000 $20,000 2 Small  Communities/Small  Projects  (COMM)

$22,748 COMM_Key

Luzerne West  Pittston  Borough

Morris  Park BRC-­‐PRD-­‐10-­‐143

$42,300 $42,000 10 Park  Rehabilitation  and  Development  (COMM)

$84,500 COMM_Key

Luzerne West  Pittston  Borough

Pool  Feasibility  Study BRC-­‐TAG-­‐12-­‐264

$12,500 $12,500 12 Feasibility  Studies  (COMM)

$25,000 COMM_Key

Luzerne West  Wyoming  Borough

Charney  Park  -­‐  Development

BRC-­‐SC-­‐17-­‐51

$40,000 $40,000 17 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Luzerne West  Wyoming  Borough

Shoemaker  Avenue  Park

BRC-­‐SC-­‐6-­‐198

$20,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$20,600 COMM_Key

Luzerne West  Wyoming  Borough

West  Side  Trail  -­‐  Phase  1B

BRC-­‐PRD-­‐14-­‐184

$172,000 $172,000 14 Park  Rehabilitation  and  Development  (COMM)

$1,318,300 COMM_Key

Luzerne White  Haven  Borough

Borough  Park KEY-­‐SC-­‐3-­‐241

$20,000 $20,000 3 Small  Communities/Small  Projects  (COMM)

$22,000 COMM_Key

Page 371: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  371  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Luzerne White Haven Borough Hemlock Street Park- Development

BRC-SC-19-54

$30,000.00 $30,000.00 19 Small Communities/Small Projects (COMM)

$40,000.00 COMM_Key

Luzerne White Haven Borough Hemlock Street Park- Development

BRC-SC-19-54

$30,000.00 $30,000.00 19 Small Communities/Small Projects (COMM)

$40,000.00 COMM_Key

Luzerne White Haven Borough Hemlock Street Park- Development

BRC-SC-19-54

$30,000.00 $30,000.00 19 Small Communities/Small Projects (COMM)

$40,000.00 COMM_Key

Luzerne White  Haven  Borough

Lehigh  Park-­‐Restroom  Construction

BRC-­‐SC-­‐8-­‐217

$22,000 $22,000 8 Small  Communities/Small  Projects  (COMM)

$32,400 COMM_Key

Luzerne White  Haven  Borough

Mini  Plan BRC-­‐TAG-­‐11.5-­‐36

$10,000 $10,000 11.5 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$20,000 COMM_Key

Luzerne White  Haven  Borough

Pine  Street  Park BRC-­‐SC-­‐13-­‐83

$24,000 $24,000 13 Small  Communities/Small  Projects  (COMM)

$30,100 COMM_Key

Luzerne Wildlands  Conservancy,  Inc.  

Bear  Creek  Plan KEY-­‐LTP-­‐4-­‐24

$25,000 $25,000 4 Open  Space  Planning  (LT)

$57,500 LT_Key

Luzerne Wildlands  Conservancy,  Inc.  

Haystack  Mountain  Tract

KEY-­‐LTA-­‐3-­‐24

$257,175 $240,000 3 Critical  Habitat  Acquisition  (LT)

$500,000 LT_Key

Luzerne Wildlands  Conservancy,  Inc.  

Little  Nescopeck  Creek  Watershed  Plan

KEY-­‐RCP-­‐95-­‐04

$50,000 $50,000 1 Planning  (RIV) $121,600 RIVER_Key

Page 372: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  372  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Luzerne Wildlands  Conservancy,  Inc.  

Monocacy  Creek  Watershed  Cons.  Plan

KEY-­‐RCP-­‐95-­‐09

$50,000 $50,000 1 Planning  (RIV) $115,100 RIVER_Key

Luzerne Wilkes-­‐Barre  City Four  Sites KEY-­‐PRD-­‐2-­‐177

$125,000 $125,000 2 Park  Rehabilitation  and  Development  (COMM)

$250,000 COMM_Key

Luzerne Wilkes-­‐Barre  City Greenway  and  Trail  Master  Plan

BRC-­‐TAG-­‐12-­‐265

$33,100 $30,000 12 Greenway  Plans  (COMM)

$68,400 COMM_Key

Luzerne Wright  Township Recreation  Park BRC-­‐PRD-­‐13-­‐453

$600,000 $220,000 13 Park  Rehabilitation  and  Development  (COMM)

$1,200,000 COMM_Key

Luzerne Wright  Township Township  Park KEY-­‐SC-­‐3-­‐244

$20,000 $20,000 3 Small  Communities/Small  Projects  (COMM)

$28,000 COMM_Key

Luzerne Wyoming  Borough Butler  Street  Park BRC-­‐SC-­‐6-­‐204

$20,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$23,600 COMM_Key

Luzerne,  Pike Lehman  Township Back  Mountain  Recreation  Complex

BRC-­‐TAG-­‐7-­‐2

$7,500 $7,500 7 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$8,250 COMM_Key

Lycoming Clinton  Township Rodgers  Park KEY-­‐SC-­‐5-­‐35 $7,062 $7,100 5 Small  Communities/Small  Projects  (COMM)

$9,586 COMM_Key

Page 373: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  373  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lycoming East  Lycoming  Recreation  Authority  

Lime  Bluff  Recreation    Area  -­‐  Phase  III

BRC-­‐PRD-­‐8-­‐60

$75,000 $75,000 8 Park  Rehabilitation  and  Development  (COMM)

$155,600 COMM_Key

Lycoming East  Lycoming  Recreation  Authority  

Lime  Bluff  Recreation  Area

BRC-­‐PRD-­‐7-­‐59

$41,900 $42,000 7 Park  Rehabilitation  and  Development  (COMM)

$92,940 COMM_Key

Lycoming East  Lycoming  Recreation  Authority  

Lime  Bluff  Recreation  Area

KEY-­‐PRD-­‐5-­‐57

$140,628 $140,600 5 Park  Rehabilitation  and  Development  (COMM)

$281,628 COMM_Key

Lycoming Hughesville  Borough Bodine  Park KEY-­‐SC-­‐3-­‐94 $10,000 $10,000 3 Small  Communities/Small  Projects  (COMM)

$18,000 COMM_Key

Lycoming Jersey  Shore  Borough

Community  Pool BRC-­‐PRD-­‐9-­‐102

$265,500 $200,000 9 Park  Rehabilitation  and  Development  (COMM)

$531,300 COMM_Key

Lycoming Jersey  Shore  Borough

Community  Pool  Renovations  -­‐  Phase  I

BRC-­‐TAG-­‐8-­‐96

$200,000 $10,000 8 Feasibility  Studies  (COMM)

$405,600 COMM_Key

Page 374: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  374  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lycoming Jersey  Shore  Borough

Jersey  Shore  Boat  Launch

BRC-­‐PRD-­‐18-­‐75

$205,770 $205,700 18 Park  Rehabilitation  and  Development  (COMM)

$411,556 COMM_Key

Lycoming Jersey  Shore  Borough

Jersey  Shore  Pine  Creek  Trail  Connector

BRC-­‐PRD-­‐14-­‐296

$355,000 $25,500 14 Park  Rehabilitation  and  Development  (COMM)

$1,273,600 COMM_Key

Lycoming Jersey  Shore  Borough

Jersey  Shore  Riverwalk/Boardwalk

BRC-­‐RCI-­‐10-­‐4

$12,100 $37,500 10 Implementation  (RIV)

$75,000 RIVER_Key

Lycoming Lewis  Township Trout  Run  Park  -­‐  Development

BRC-­‐SC-­‐17-­‐43

$40,000 $40,000 17 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Lycoming Loyalsock  Township Bruce  E.  Henry  Park  Renovation

BRC-­‐PRD-­‐11-­‐52

$120,000 $120,000 11 Park  Rehabilitation  and  Development  (COMM)

$240,000 COMM_Key

Lycoming Loyalsock  Township Bull  Run  Park KEY-­‐ACQ-­‐1-­‐76

$18,000 $18,000 1 Acquisition  (COMM)

$40,000 COMM_Key

Lycoming Loyalsock  Township Community  Pool  Renovations

BRC-­‐PRD-­‐6-­‐100

$90,000 $90,000 6 Park  Rehabilitation  and  Development  (COMM)

$199,000 COMM_Key

Page 375: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  375  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lycoming Loyalsock  Township James  E.  Short  Park BRC-­‐PRD-­‐9-­‐124

$49,800 $49,000 9 Park  Rehabilitation  and  Development  (COMM)

$99,600 COMM_Key

Lycoming Loyalsock  Township Loyalsock  Riverfront  Park  Trail  -­‐  Phase  2  -­‐  Development

BRC-­‐PRT-­‐17-­‐74

$174,637 $74,600 17 Development  and  Rehabilitation

$218,296 COMM_Key

Lycoming Loyalsock  Township Master  Site  Development  Plan

KEY-­‐TAG-­‐3-­‐122

$13,400 $13,400 3 Master  Site  Plans  (COMM)

$29,700 COMM_Key

Lycoming Loyalsock  Township Millers  Run  Greenway

BRC-­‐TAG-­‐18-­‐142

$18,500 $18,500 18 Greenway  Plans  (COMM)

$37,000 COMM_Key

Lycoming Loyalsock  Township Riverfront  Park KEY-­‐ACQ-­‐2-­‐89

$131,558 $100,000 2 Acquisition  (COMM)

$226,116 COMM_Key

Lycoming Loyalsock  Township Riverfront  Park KEY-­‐PRD-­‐5-­‐118

$65,000 $65,000 5 Park  Rehabilitation  and  Development  (COMM)

$133,900 COMM_Key

Lycoming Lycoming  County Comprehensive  Recreation,  Park  &  Open  Space  Plan

KEY-­‐TAG-­‐5-­‐120

$30,000 $80,000 5 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$160,000 COMM_Key

Lycoming Lycoming  County Susquehanna  Riverwalk

BRC-­‐PRD-­‐13-­‐121

$184,000 $184,000 13 Park  Rehabilitation  and  Development  (COMM)

$920,400 COMM_Key

Page 376: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  376  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lycoming Lycoming  County Susquehanna  Riverwalk  -­‐  Phase  II

BRC-­‐PRD-­‐13.3-­‐391

$229,400 $229,400 13.3 Park  Rehabilitation  and  Development  (COMM)

$1,147,000 COMM_Key

Lycoming McIntyre  Township Ralston  Playground BRC-­‐SC-­‐8-­‐116

$30,000 $30,000 8 Small  Communities/Small  Projects  (COMM)

$40,000 COMM_Key

Lycoming Mifflin  Township Community  Park  Master  Plan

KEY-­‐TAG-­‐5-­‐131

$5,200 $5,200 5 Master  Site  Plans  (COMM)

$10,400 COMM_Key

Lycoming Mifflin  Township Mifflin  Township  Park  -­‐  Phase  II

BRC-­‐PRD-­‐13-­‐123

$60,000 $60,000 13 Park  Rehabilitation  and  Development  (COMM)

$120,000 COMM_Key

Lycoming Mifflin Township Mifflin Township Park- Phase 3- Development

BRC-PRD-19-97

$43,500.00 $43,500.00 19 Park Rehabilitation and Development (COMM)

$87,000.00 COMM_Key

Lycoming Mifflin Township Mifflin Township Park- Phase 3- Development

BRC-PRD-19-97

$43,500.00 $43,500.00 19 Park Rehabilitation and Development (COMM)

$87,000.00 COMM_Key

Lycoming Mifflin Township Mifflin Township Park- Phase 3- Development

BRC-PRD-19-97

$43,500.00 $43,500.00 19 Park Rehabilitation and Development (COMM)

$87,000.00 COMM_Key

Page 377: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  377  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lycoming Mifflin  Township Township  Park BRC-­‐PRD-­‐7-­‐129

$37,435 $30,000 7 Park  Rehabilitation  and  Development  (COMM)

$75,440 COMM_Key

Lycoming Montgomery  Borough

Heritage  Park  Phase  II

KEY-­‐SC-­‐2-­‐105

$20,000 $20,000 2 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Lycoming Montgomery  Borough

Montgomery  Park BRC-­‐SC-­‐7-­‐132

$20,000 $20,000 7 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Lycoming Montgomery  Borough

Skateboard  Park BRC-­‐SC-­‐9-­‐139

$40,000 $40,000 9 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Lycoming Montoursville  Borough

Indian  Park KEY-­‐SC-­‐4-­‐106

$9,200 $9,200 4 Small  Communities/Small  Projects  (COMM)

$15,000 COMM_Key

Lycoming Montoursville  Borough

Pool  Feasibility  Study BRC-­‐TAG-­‐10-­‐160

$6,500 $6,500 10 Feasibility  Studies  (COMM)

$13,000 COMM_Key

Lycoming Muncy  Borough Muncy  Trail  Network  Plan

BRC-­‐TAG-­‐14-­‐222

$22,500 $22,500 14 Trail  Study  (COMM)

$45,000 COMM_Key

Lycoming Muncy  Creek  Township

Heritage  Park  and  Nature  Trail

BRC-­‐PRD-­‐14-­‐156

$50,000 $50,000 14 Park  Rehabilitation  and  Development  (COMM)

$183,000 COMM_Key

Page 378: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  378  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lycoming Muncy  Creek  Township

Kiess  Memorial  Park KEY-­‐SC-­‐4-­‐109

$10,700 $11,000 4 Small  Communities/Small  Projects  (COMM)

$21,100 COMM_Key

Lycoming Muncy  Creek  Township

Muncy  Canal  Heritage  Park  and  Nature  Trail

BRC-­‐TAG-­‐12-­‐280

$20,000 $20,000 12 Master  Site  Plans  (COMM)

$55,000 COMM_Key

Lycoming Northcentral  Pennsylvania  Conservancy  

Thompson  Tract BRC-­‐LTA-­‐6-­‐26

$394,500 $200,000 6 Open  Space  Acquisition  (LT)

$789,000 LT_Key

Lycoming Old  Lycoming  Township

Two  Sites BRC-­‐PRD-­‐6-­‐133

$75,000 $75,000 6 Park  Rehabilitation  and  Development  (COMM)

$150,000 COMM_Key

Lycoming Picture  Rocks  Borough

Picture  Rocks  Park  (aka  Van  Rensselaer  Park)

BRC-­‐SC-­‐14-­‐101

$35,000 $35,000 14 Small  Communities/Small  Projects  (COMM)

$45,000 COMM_Key

Lycoming Pine  Creek  Council  of  Governments  

Pine  Creek  PA  Wilds  Early  Action  Initiatives

BRC-­‐TAG-­‐12.5-­‐4

$77,700 $54,000 12.5 Conservation/Sound  Land  Use  (COMM)

$155,400 COMM_Key

Lycoming South  Williamsport  Borough

Susquehanna  River  Walk  Extension

BRC-­‐PRD-­‐11-­‐82

$55,200 $55,200 11 Park  Rehabilitation  and  Development  (COMM)

$372,800 COMM_Key

Page 379: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  379  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lycoming South  Williamsport  Borough

Swimming  Pool BRC-­‐PRD-­‐9-­‐195

$275,000 $200,000 9 Park  Rehabilitation  and  Development  (COMM)

$555,000 COMM_Key

Lycoming South  Williamsport  Borough

Three  Sites KEY-­‐PRD-­‐2-­‐145

$59,040 $50,000 2 Park  Rehabilitation  and  Development  (COMM)

$131,200 COMM_Key

Lycoming Williamsport  City Lose  School  and  Young's  Woods  Parks

BRC-­‐PRD-­‐13-­‐156

$250,000 $250,000 13 Park  Rehabilitation  and  Development  (COMM)

$504,900 COMM_Key

Lycoming Williamsport  City Memorial  Park KEY-­‐PRD-­‐4-­‐177

$77,800 $78,000 4 Park  Rehabilitation  and  Development  (COMM)

$155,600 COMM_Key

Lycoming Williamsport  City Newberry  Park BRC-­‐PRD-­‐13.3-­‐449

$321,500 $200,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$643,000 COMM_Key

Lycoming Williamsport  City Newberry  Park KEY-­‐PRD-­‐1-­‐150

$29,000 $29,000 1 Park  Rehabilitation  and  Development  (COMM)

$80,000 COMM_Key

Page 380: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  380  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Lycoming Williamsport  City Park  Master  Plans BRC-­‐TAG-­‐11.5-­‐39

$35,000 $35,000 11.5 Master  Site  Plans  (COMM)

$70,000 COMM_Key

Lycoming Williamsport  City Peer  to  Peer BRC-­‐TAG-­‐10-­‐174

$10,000 $11,000 10 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$11,000 COMM_Key

Lycoming Williamsport  City Shaw  Place  Park-­‐  Development

BRC-­‐PRD-­‐18-­‐105

$250,000 $250,000 18 Park  Rehabilitation  and  Development  (COMM)

$500,500 COMM_Key

Lycoming Williamsport  City Williamsport  Pool  Feasibility  Study

BRC-­‐TAG-­‐13.6-­‐606

$20,000 $20,000 13.6 Feasibility  Studies  (COMM)

$40,000 COMM_Key

McKean Bradford  City Callahan  Park BRC-­‐PRD-­‐13.3-­‐340

$60,000 $60,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$120,000 COMM_Key

McKean Bradford  City Callahan  Park KEY-­‐ACQ-­‐4-­‐17

$31,000 $30,000 4 Acquisition  (COMM)

$62,000 COMM_Key

McKean Bradford  City Callahan  Park KEY-­‐PRD-­‐2-­‐15

$81,500 $81,500 2 Park  Rehabilitation  and  Development  (COMM)

$163,000 COMM_Key

McKean Bradford  City Callahan  Park  Ice  Rink

KEY-­‐PRD-­‐5-­‐20

$50,000 $50,000 5 Park  Rehabilitation  and  Development  (COMM)

$325,000 COMM_Key

Page 381: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  381  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

McKean Bradford  City Callahan  Park  Improvements

KEY-­‐PRD-­‐1-­‐16

$150,000 $100,000 1 Park  Rehabilitation  and  Development  (COMM)

$350,000 COMM_Key

McKean Bradford  City Community  Parks  Trail

BRC-­‐PRD-­‐14-­‐117

$175,000 $175,000 14 Park  Rehabilitation  and  Development  (COMM)

$1,442,300 COMM_Key

McKean Bradford  City Poplin  Avenue  Athletic  Field

BRC-­‐PRD-­‐9-­‐27

$100,000 $100,000 9 Park  Rehabilitation  and  Development  (COMM)

$215,000 COMM_Key

McKean Bradford  Township Marilla  Reservoir  Trail

BRC-­‐PRD-­‐9-­‐30

$150,000 $150,000 9 Park  Rehabilitation  and  Development  (COMM)

$370,000 COMM_Key

McKean Eldred  Borough Eldred  Memorial  Park

KEY-­‐SC-­‐5-­‐59 $20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$20,904 COMM_Key

McKean Foster  Township Foster  Township  Recreational  Area

BRC-­‐PRD-­‐7-­‐77

$58,907 $53,300 7 Park  Rehabilitation  and  Development  (COMM)

$117,815 COMM_Key

Page 382: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  382  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

McKean Kane  Borough Glenwood  Park KEY-­‐SC-­‐4-­‐74 $20,000 $20,000 4 Small  Communities/Small  Projects  (COMM)

$25,000 COMM_Key

McKean Kane  Borough Glenwood  Park KEY-­‐SC-­‐5-­‐102

$20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

McKean Keating  Township Hilltop  Community  Park

BRC-­‐SC-­‐9-­‐107

$20,000 $21,000 9 Small  Communities/Small  Projects  (COMM)

$29,800 COMM_Key

McKean Kinzua  Valley  Trail  Club  

Kinzua  Valley  Trail BRC-­‐RTD-­‐8-­‐9

$63,700 $40,000 8 Rail  Rehabilitation  and  Development  (RT)

$152,000 RT_Key

McKean Lafayette  Township Township  Playground

BRC-­‐SC-­‐13.3-­‐309

$19,600 $20,000 13.3 Small  Communities/Small  Projects  (COMM)

$19,600 COMM_Key

McKean Lewis  Run  Borough Borough  Park KEY-­‐SC-­‐5-­‐111

$20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$27,139 COMM_Key

McKean Lewis  Run  Borough Lewis  Run  Borough  Park

BRC-­‐SC-­‐8-­‐103

$26,000 $26,000 8 Small  Communities/Small  Projects  (COMM)

$32,000 COMM_Key

Page 383: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  383  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

McKean McKean  County Trail  Feasibility  Study  and  Master  Site  Plans

BRC-­‐TAG-­‐14-­‐219

$25,000 $25,000 14 Trail  Study  (COMM)

$50,000 COMM_Key

McKean Norwich  Township Norwich  Township  Park

BRC-­‐SC-­‐7-­‐144

$32,347 $26,000 7 Small  Communities/Small  Projects  (COMM)

$38,781 COMM_Key

McKean Otto  Township Pool  Feasiblity  Study BRC-­‐TAG-­‐13.6-­‐602

$7,500 $7,500 13.6 Feasibility  Studies  (COMM)

$15,000 COMM_Key

McKean Smethport  Borough Hamlin  Park  Plan BRC-­‐TAG-­‐10-­‐168

$9,300 $9,300 10 Master  Site  Plans  (COMM)

$18,600 COMM_Key

McKean Tuna  Valley  Council  of  Governments  

Tuna  Valley  Trails  Greenway  Plan

KEY-­‐TAG-­‐5-­‐205

$20,000 $20,000 5 Greenway  Plans  (COMM)

$40,000 COMM_Key

McKean Tuna  Valley  Trail  Association  

South  Trail-­‐  renamed  Blaisdell  Emery  Trail

BRC-­‐RTD-­‐11-­‐12

$175,000 $175,000 11 Rail  Rehabilitation  and  Development  (RT)

$425,300 RT_Key

McKean,  Potter

Western  Pennsylvania  Conservancy  

Allegheny  River  Headwaters  Conservation  Plan

BRC-­‐RCP-­‐13.3-­‐513

$120,000 $105,000 13.3 Planning  (RIV) $240,100 RIVER_Key

Mercer Clark  Borough Henderson  Taylor  Community  Park

BRC-­‐SC-­‐10-­‐70

$28,400 $28,400 10 Small  Communities/Small  Projects  (COMM)

$36,800 COMM_Key

Mercer Clark  Borough Henderson  Taylor  Community  Park

BRC-­‐SC-­‐6-­‐40

$20,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Page 384: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  384  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Mercer Clark  Borough Henderson  Taylor  Community  Park

BRC-­‐SC-­‐8-­‐236

$33,000 $33,000 8 Small  Communities/Small  Projects  (COMM)

$46,000 COMM_Key

Mercer Delaware  Township Township  Park-­‐  Phase  I

BRC-­‐SC-­‐13.3-­‐295

$20,000 $20,000 13.3 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Mercer Farrell  City Comprehensive  Recreation  &  Park  Plan

KEY-­‐TAG-­‐1-­‐48

$206,050 $10,000 1 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$412,100 COMM_Key

Mercer Farrell  City SW  Gardens  &  Veteran's  Sq.  Parks

BRC-­‐PRD-­‐8-­‐69

$17,500 $17,000 8 Park  Rehabilitation  and  Development  (COMM)

$35,000 COMM_Key

Mercer Farrell  City Veterans  Square  Park-­‐Development

BRC-­‐PRD-­‐18-­‐70

$36,000 $36,000 18 Park  Rehabilitation  and  Development  (COMM)

$72,000 COMM_Key

Mercer Greenville  Borough Master  Site  Development  Plan

KEY-­‐TAG-­‐3-­‐76

$15,300 $8,100 3 Master  Site  Plans  (COMM)

$30,600 COMM_Key

Mercer Grove  City  Borough Hunter  Farm  and  Stewart  Avenue  Playgrounds

BRC-­‐PRD-­‐6-­‐77

$75,000 $75,000 6 Park  Rehabilitation  and  Development  (COMM)

$150,000 COMM_Key

Page 385: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  385  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Mercer Grove  City  Borough Memorial  Park BRC-­‐PRD-­‐12-­‐157

$50,200 $50,000 12 Park  Rehabilitation  and  Development  (COMM)

$100,400 COMM_Key

Mercer Grove  City  Borough Memorial  Park KEY-­‐PRD-­‐2-­‐55

$75,000 $75,000 2 Park  Rehabilitation  and  Development  (COMM)

$150,000 COMM_Key

Mercer Grove  City  Borough Memorial  Park KEY-­‐PRD-­‐3-­‐77

$68,000 $68,000 3 Park  Rehabilitation  and  Development  (COMM)

$143,000 COMM_Key

Mercer Grove  City  Borough Memorial  Park KEY-­‐PRD-­‐5-­‐77

$75,000 $75,000 5 Park  Rehabilitation  and  Development  (COMM)

$150,000 COMM_Key

Mercer Grove  City  Borough Memorial  Park  -­‐  Phase  I

KEY-­‐PRD-­‐1-­‐54

$74,000 $74,000 1 Park  Rehabilitation  and  Development  (COMM)

$148,000 COMM_Key

Mercer Hempfield  Township Community  Park BRC-­‐SC-­‐8-­‐84

$35,000 $35,000 8 Small  Communities/Small  Projects  (COMM)

$50,000 COMM_Key

Page 386: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  386  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Mercer Hermitage  City City-­‐School  Recreation  Complex

KEY-­‐PRD-­‐2-­‐61

$85,000 $85,000 2 Park  Rehabilitation  and  Development  (COMM)

$170,000 COMM_Key

Mercer Hermitage  City Community  Recreation  Site

KEY-­‐ACQ-­‐3-­‐89

$75,000 $75,000 3 Acquisition  (COMM)

$150,000 COMM_Key

Mercer Hermitage  City Comprehensive  Recreation,  Park  &  Open  Space  Plan

BRC-­‐TAG-­‐18-­‐140

$25,000 $25,000 18 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$50,000 COMM_Key

Mercer Hermitage  City Hermitage  Athletic  Complex  -­‐Development

BRC-­‐PRD-­‐18-­‐72

$100,000 $100,000 18 Park  Rehabilitation  and  Development  (COMM)

$200,000 COMM_Key

Mercer Hermitage  City Linden  Point  Trail  -­‐  Phase  II

BRC-­‐PRD-­‐11-­‐42

$100,000 $100,000 11 Park  Rehabilitation  and  Development  (COMM)

$200,000 COMM_Key

Mercer Hermitage  City Master  Site  Development  Plan

KEY-­‐TAG-­‐3-­‐88

$10,000 $10,000 3 Master  Site  Plans  (COMM)

$20,000 COMM_Key

Mercer Hermitage  City Rodny  White  Olympic  Park  -­‐  Phase  II

BRC-­‐PRD-­‐6-­‐83

$148,500 $148,500 6 Park  Rehabilitation  and  Development  (COMM)

$742,500 COMM_Key

Mercer Hermitage  City Whispering  Pines  Park  Master  Plan

KEY-­‐TAG-­‐5-­‐86

$17,500 $17,500 5 Master  Site  Plans  (COMM)

$35,000 COMM_Key

Page 387: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  387  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Mercer Jackson  Center  Borough

Wesley  McAfoose  Community  Park

BRC-­‐SC-­‐8-­‐91

$25,000 $25,000 8 Small  Communities/Small  Projects  (COMM)

$30,000 COMM_Key

Mercer Jamestown  Borough Scipio  Street  Park KEY-­‐SC-­‐3-­‐97 $15,400 $15,400 3 Small  Communities/Small  Projects  (COMM)

$16,200 COMM_Key

Mercer Jefferson  Township Jefferson  Twp.  Park  Master  Site  Plan

BRC-­‐TAG-­‐8-­‐95

$12,500 $12,500 8 Master  Site  Plans  (COMM)

$25,000 COMM_Key

Mercer Jefferson  Township Township  Park BRC-­‐SC-­‐11-­‐129

$40,000 $40,000 11 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Mercer Jefferson  Township Township  Park KEY-­‐SC-­‐1-­‐63 $19,710 $19,700 1 Small  Communities/Small  Projects  (COMM)

$21,360 COMM_Key

Mercer Lackawannock  Township

Township  Park BRC-­‐SC-­‐6-­‐90

$20,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$21,470 COMM_Key

Mercer Lake  Township Jack  Jones  Memorial  Complex

BRC-­‐TAG-­‐7-­‐96

$13,000 $13,000 7 Master  Site  Plans  (COMM)

$26,074 COMM_Key

Mercer Mercer  Borough Brandy  Springs  Park KEY-­‐SC-­‐3-­‐133

$20,000 $20,000 3 Small  Communities/Small  Projects  (COMM)

$23,026 COMM_Key

Page 388: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  388  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Mercer Mercer  Borough Lamar  Field KEY-­‐SC-­‐2-­‐97 $20,000 $20,000 2 Small  Communities/Small  Projects  (COMM)

$33,733 COMM_Key

Mercer Mercer  County 4-­‐H  Park KEY-­‐PRD-­‐5-­‐128

$16,000 $16,000 5 Park  Rehabilitation  and  Development  (COMM)

$32,000 COMM_Key

Mercer Mercer  County Chestnut  Run  Recreation  Area

KEY-­‐PRD-­‐3-­‐134

$50,000 $47,000 3 Park  Rehabilitation  and  Development  (COMM)

$100,000 COMM_Key

Mercer Mercer  County Chestnut  Run  Swim  Beach

BRC-­‐PRD-­‐7-­‐126

$30,000 $30,000 7 Park  Rehabilitation  and  Development  (COMM)

$60,000 COMM_Key

Mercer Mercer  County Munnell  Run  Farm BRC-­‐PRD-­‐13.3-­‐394

$170,100 $170,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$344,200 COMM_Key

Mercer Mercer  County  Housing  Authority  

Three  Sites KEY-­‐PRD-­‐4-­‐101

$97,200 $97,200 4 Park  Rehabilitation  and  Development  (COMM)

$194,400 COMM_Key

Page 389: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  389  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Mercer Mercer  County  Regional  Council  of  Governments  

L-­‐S-­‐WM  Community  Pool  Study

BRC-­‐TAG-­‐12-­‐249

$20,000 $20,000 12 Feasibility  Studies  (COMM)

$40,000 COMM_Key

Mercer Mercer  County  Regional  Council  of  Governments  

MCRCOG  Recreation  Circuit  Rider,  Year  1

KEY-­‐TAG-­‐4-­‐100

$30,000 $30,000 4 Circuit  Rider  (COMM)

$87,400 COMM_Key

Mercer Mercer  County  Regional  Council  of  Governments  

Shenango  Valley  Softball  Complex

BRC-­‐PRD-­‐9-­‐133

$76,500 $76,000 9 Park  Rehabilitation  and  Development  (COMM)

$153,000 COMM_Key

Mercer Mercer  County  Regional  Council  of  Governments  

Swimming  Pool  and  Recreation  Complex

BRC-­‐PRD-­‐7-­‐127

$50,000 $50,000 7 Park  Rehabilitation  and  Development  (COMM)

$100,000 COMM_Key

Mercer Mercer  County  Regional  Council  of  Governments  

Trout  Island  Trail BRC-­‐PRD-­‐8-­‐117

$103,000 $103,000 8 Park  Rehabilitation  and  Development  (COMM)

$283,000 COMM_Key

Mercer Mercer  County  Regional  Planning  Commission  County

Greenways,  Open  Space  &  Rural  Rec.  Plan

BRC-­‐TAG-­‐9-­‐132

$22,500 $22,000 9 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$45,000 COMM_Key

Mercer Perry  Township Commodore  Perry  Community  Park

KEY-­‐SC-­‐3-­‐169

$19,200 $19,200 3 Small  Communities/Small  Projects  (COMM)

$19,700 COMM_Key

Page 390: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  390  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Mercer Pymatuning  Township

Pymatuning  Township  Park

BRC-­‐SC-­‐8-­‐160

$24,000 $24,000 8 Small  Communities/Small  Projects  (COMM)

$28,000 COMM_Key

Mercer Sandy  Lake  Borough G.  Turner  Craig  Community  Park

KEY-­‐SC-­‐2-­‐136

$20,000 $20,000 2 Small  Communities/Small  Projects  (COMM)

$25,000 COMM_Key

Mercer Sharon  City Bicentenial  Park  Master  Site  Plan

BRC-­‐TAG-­‐13-­‐206

$10,000 $10,000 13 Master  Site  Plans  (COMM)

$23,100 COMM_Key

Mercer Sharon  City Comp.  Recreation,  Park  &  Open  Space  Plan

BRC-­‐TAG-­‐6-­‐164

$15,000 $15,000 6 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$30,000 COMM_Key

Mercer Sharpsville  Borough Grandy  Acquisition  (Erie  Canal  Lock  Park)

BRC-­‐ACQ-­‐18-­‐9

$11,100 $11,000 18 Acquisition  (COMM)

$22,200 COMM_Key

Mercer Sharpsville  Borough Milliken  Avenue  Park-­‐Development

BRC-­‐PRD-­‐18-­‐98

$152,250 $152,000 18 Park  Rehabilitation  and  Development  (COMM)

$304,500 COMM_Key

Mercer Shenango  River  Watchers,  Inc.  

Shenango  River  Water  Trail  Feasibility  Study

BRC-­‐RCP-­‐13.3-­‐493

$11,000 $11,000 13.3 Feasibility  Studies  (COMM)

$22,000 RIVER_Key

Mercer Shenango  Township Community  Park BRC-­‐SC-­‐10-­‐96

$40,000 $40,000 10 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Page 391: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  391  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Mercer Shenango  Township Township  Park KEY-­‐SC-­‐2-­‐139

$20,000 $20,000 2 Small  Communities/Small  Projects  (COMM)

$27,000 COMM_Key

Mercer South  Pymatuning  Township

McCullough  Run  Athletic  Complex

KEY-­‐SC-­‐3-­‐199

$20,000 $20,000 3 Small  Communities/Small  Projects  (COMM)

$23,650 COMM_Key

Mercer South  Pymatuning  Township

South  Pymatuning  Park

BRC-­‐SC-­‐11-­‐157

$40,000 $40,000 11 Small  Communities/Small  Projects  (COMM)

$61,500 COMM_Key

Mercer Stoneboro  Borough Skateboard  Park BRC-­‐SC-­‐10-­‐98

$40,000 $30,000 10 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Mercer West  Middlesex  Borough

L-­‐S-­‐WM  Park  and  Pool  Complex

KEY-­‐SC-­‐2-­‐174

$20,000 $20,000 2 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Mercer West  Middlesex  Borough

Regional  Skate  Park BRC-­‐SC-­‐9-­‐230

$40,000 $40,000 9 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Mercer Wheatland  Borough Beechwood  Avenue  Playground  Development

BRC-­‐SC-­‐18-­‐43

$40,000 $40,000 18 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Mercer Wilmington  Township

Community  Park  Master  Plan

BRC-­‐TAG-­‐12-­‐267

$6,000 $6,000 12 Master  Site  Plans  (COMM)

$12,000 COMM_Key

Page 392: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  392  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Mercer Wolf  Creek  Township

Wolf  Creek  Twp.  Community  Park

BRC-­‐SC-­‐8-­‐222

$29,500 $29,000 8 Small  Communities/Small  Projects  (COMM)

$39,000 COMM_Key

Mifflin Bratton  Township Longfellow  Playground

BRC-­‐SC-­‐9-­‐31

$25,000 $25,000 9 Small  Communities/Small  Projects  (COMM)

$30,000 COMM_Key

Mifflin Burnham  Borough Borough  Park KEY-­‐SC-­‐1-­‐24 $20,000 $20,000 1 Small  Communities/Small  Projects  (COMM)

$21,995 COMM_Key

Mifflin Derry  Township Playground  Renovation

BRC-­‐PRD-­‐10-­‐113

$70,500 $70,000 10 Park  Rehabilitation  and  Development  (COMM)

$141,000 COMM_Key

Mifflin Granville  Township Community  Park BRC-­‐PRD-­‐10-­‐118

$105,300 $100,000 10 Park  Rehabilitation  and  Development  (COMM)

$210,600 COMM_Key

Mifflin Granville  Township Community  Park BRC-­‐TAG-­‐7-­‐79

$7,000 $7,000 7 Master  Site  Plans  (COMM)

$14,000 COMM_Key

Mifflin Granville  Township Lockport  Area  Ballfield

BRC-­‐ACQ-­‐6-­‐74

$17,200 $17,200 6 Acquisition  (COMM)

$34,400 COMM_Key

Mifflin Lewistown  Borough Kish  Riverwalk/Trail BRC-­‐PRD-­‐8-­‐105

$126,500 $110,000 8 Park  Rehabilitation  and  Development  (COMM)

$253,200 COMM_Key

Page 393: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  393  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Mifflin Lewistown  Borough Rec  Park  Swimming  Pool

BRC-­‐PRD-­‐14-­‐150

$234,800 $195,000 14 Park  Rehabilitation  and  Development  (COMM)

$469,700 COMM_Key

Mifflin Lewistown  Borough Recreation  Park  Pool KEY-­‐PRD-­‐5-­‐112

$170,600 $150,000 5 Park  Rehabilitation  and  Development  (COMM)

$341,200 COMM_Key

Mifflin Mifflin County Juniata River Boat Launch Development

BRC-RCD-19-159

$125,000.00 $125,000.00 19 Development (RIV)

$250,000.00 COMM_Key

Mifflin Mifflin County Juniata River Boat Launch Development

BRC-RCD-19-159

$125,000.00 $125,000.00 19 Development (RIV)

$250,000.00 COMM_Key

Mifflin Mifflin County Juniata River Boat Launch Development

BRC-RCD-19-159

$125,000.00 $125,000.00 19 Development (RIV)

$250,000.00 COMM_Key

Mifflin Union  Township Little  Kishacoquillas  Restoration

BRC-­‐RCA-­‐8-­‐18

$39,000 $39,000 8 Acquisition  (RIV)

$78,000 RIVER_Key

Mifflin Union  Township Union  Township  Playground

BRC-­‐SC-­‐9-­‐212

$30,000 $30,000 9 Small  Communities/Small  Projects  (COMM)

$40,000 COMM_Key

Monroe Barrett  Township Chaykosky  Land  Acquisition

BRC-­‐ACQ-­‐17-­‐88

$193,050 $193,000 17 Acquisition  (COMM)

$387,450 COMM_Key

Monroe Barrett  Township Riley  Tract,  Gutherie  Tract  and  Ripkey  Tract  Acquisition

BRC-­‐ACQ-­‐13-­‐261

$411,500 $411,000 13 Acquisition  (COMM)

$858,500 COMM_Key

Monroe Barrett  Township Upper  Brodhead-­‐Paradise  Creek  Greenway  Plan

BRC-­‐TAG-­‐12.5-­‐6

$29,600 $29,000 12.5 Greenway  Plans  (COMM)

$59,200 COMM_Key

Page 394: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  394  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Monroe Brodhead  Watershed  Association  

Brodhead  and  Cherry  Creek  Watershed  Cons.  Plans

KEY-­‐RCP-­‐5-­‐3

$55,225 $56,000 5 Planning  (RIV) $208,700 RIVER_Key

Monroe Brodhead  Watershed  Association  

Inv.  Species  Mgmt.  Plan  Brodhead  &  Cherry  Creek  Watershed-­‐II

BRC-­‐RCI-­‐13.3-­‐506

$22,200 $22,200 13.3 Implementation  (RIV)

$46,100 RIVER_Key

Monroe Brodhead  Watershed  Association  

Invasive  Species  Management  Plan

BRC-­‐RCI-­‐11-­‐5

$65,000 $40,000 11 Implementation  (RIV)

$156,200 RIVER_Key

Monroe Brodhead  Watershed  Association  

Watershed  GIS  -­‐  Based  Study

BRC-­‐RCP-­‐13-­‐9

$58,300 $30,000 13 Planning  (RIV) $124,300 RIVER_Key

Monroe Chestnuthill  Township

Peer  to  Peer BRC-­‐TAG-­‐10-­‐13

$10,000 $10,000 10 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$11,000 COMM_Key

Monroe Chestnuthill  Township

Regional  Comprehensive  Open  Space/Land  Use  Plan

BRC-­‐TAG-­‐9-­‐47

$25,500 $25,000 9 Conservation/Sound  Land  Use  (COMM)

$100,000 COMM_Key

Monroe Chestnuthill  Township

Regional  Park  Acquisition

BRC-­‐ACQ-­‐8-­‐40

$535,000 $360,000 8 Acquisition  (COMM)

$1,070,000 COMM_Key

Monroe Chestnuthill  Township

Romascavage  Acquisition  II

BRC-­‐ACQ-­‐18-­‐5

$140,000 $140,000 18 Acquisition  (COMM)

$320,000 COMM_Key

Monroe Chestnuthill  Township

Romascavage  West  End  Regional  Park  MSP

BRC-­‐TAG-­‐10-­‐150

$30,000 $30,000 10 Master  Site  Plans  (COMM)

$60,000 COMM_Key

Page 395: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  395  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Monroe Chestnuthill  Township

Shiffer  Acquisition BRC-­‐ACQ-­‐14-­‐50

$235,000 $235,000 14 Acquisition  (COMM)

$501,100 COMM_Key

Monroe Chestnuthill  Township

Township  Park KEY-­‐PRD-­‐2-­‐28

$11,500 $11,500 2 Park  Rehabilitation  and  Development  (COMM)

$23,000 COMM_Key

Monroe Coolbaugh  Township Hoodak  Property  Acquisition

BRC-­‐ACQ-­‐11-­‐173

$315,000 $100,000 11 Acquisition  (COMM)

$630,000 COMM_Key

Monroe East  Stroudsburg  Borough

Dansbury  Park KEY-­‐PRD-­‐3-­‐56

$18,600 $19,000 3 Park  Rehabilitation  and  Development  (COMM)

$37,400 COMM_Key

Monroe East  Stroudsburg  Borough

Dansbury  Trailhead  Development

BRC-­‐PRD-­‐12-­‐150

$100,000 $100,000 12 Park  Rehabilitation  and  Development  (COMM)

$200,000 COMM_Key

Monroe East  Stroudsburg  Borough

Levee  Loop  Trail BRC-­‐PRD-­‐16-­‐129

$37,969 $37,900 16 Park  Rehabilitation  and  Development  (COMM)

$75,939 COMM_Key

Monroe East  Stroudsburg  Borough

Terra  Greens  Golf  Course  Acquisition

BRC-­‐ACQ-­‐11-­‐253

$800,000 $200,000 11 Acquisition  (COMM)

$4,150,000 COMM_Key

Monroe Eldred  Township Mock  Park  -­‐  Development

BRC-­‐SC-­‐17-­‐34

$40,000 $40,000 17 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Page 396: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  396  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Monroe Eldred  Township Mock  Property  Acquisition

BRC-­‐ACQ-­‐12.5-­‐7

$285,150 $280,000 12.5 Acquisition  (COMM)

$570,300 COMM_Key

Monroe Eldred  Township Municipal  Park  Master  Site  Plan

BRC-­‐TAG-­‐14-­‐202

$25,000 $25,000 14 Master  Site  Plans  (COMM)

$50,000 COMM_Key

Monroe Hamilton  Jackson  Pocono  Open  Space  Commission  

HJP  Park  -­‐  Phase  I BRC-­‐PRD-­‐13.3-­‐371

$125,000 $125,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$280,000 COMM_Key

Monroe Hamilton  Township Peer  to  Peer BRC-­‐TAG-­‐10-­‐14

$7,500 $7,500 10 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$8,250 COMM_Key

Monroe Hamilton  Township Schimpf  Tract KEY-­‐ACQ-­‐5-­‐78

$75,000 $75,000 5 Acquisition  (COMM)

$150,000 COMM_Key

Monroe Jackson  Township Donofrio  Acquisition BRC-­‐ACQ-­‐15-­‐44

$325,128 $225,000 15 Acquisition  (COMM)

$985,237 COMM_Key

Monroe Jackson  Township Golden  Slipper  Camp  Acquisition

BRC-­‐ACQ-­‐10-­‐185

$516,500 $250,000 10 Acquisition  (COMM)

$1,109,600 COMM_Key

Monroe Jackson  Township HJP  Regional  Park BRC-­‐PRD-­‐13-­‐375

$110,000 $110,000 13 Park  Rehabilitation  and  Development  (COMM)

$251,800 COMM_Key

Monroe Jackson  Township HJP  Regional  Park  Master  Site  Plan

BRC-­‐TAG-­‐11-­‐212

$30,000 $30,000 11 Master  Site  Plans  (COMM)

$60,000 COMM_Key

Monroe Jackson  Township Ray  Acquisition BRC-­‐ACQ-­‐17-­‐94

$119,000 $119,000 17 Acquisition  (COMM)

$355,000 COMM_Key

Monroe Jackson  Township Shaw  Acquisition BRC-­‐ACQ-­‐13.3-­‐279

$316,600 $300,000 13.3 Acquisition  (COMM)

$1,129,600 COMM_Key

Page 397: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  397  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Monroe Middle  Smithfield  Township

Community  Rec.  Area

BRC-­‐ACQ-­‐6-­‐111

$150,000 $125,000 6 Acquisition  (COMM)

$300,000 COMM_Key

Monroe Middle  Smithfield  Township

Cradle  of  Libery  Council  Acquisition  -­‐  (BSA)

BRC-­‐ACQ-­‐13.3-­‐281

$247,500 $244,100 13.3 Acquisition  (COMM)

$495,100 COMM_Key

Monroe Middle  Smithfield  Township

Municipal  Park  Master  Site  Plan

BRC-­‐TAG-­‐13-­‐196

$17,500 $17,500 13 Master  Site  Plans  (COMM)

$35,000 COMM_Key

Monroe Monroe  County Community  Park KEY-­‐PRD-­‐2-­‐104

$95,116 $95,100 2 Park  Rehabilitation  and  Development  (COMM)

$190,200 COMM_Key

Monroe Monroe  County Comp.  Rec.,  Park  and  Open  Space  Plan

BRC-­‐TAG-­‐17-­‐13

$40,000 $40,000 17 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$80,000 COMM_Key

Monroe Monroe  County Greenway  and  Open  Space  Plans

KEY-­‐TAG-­‐3-­‐140

$59,300 $37,500 3 Greenway  Plans  (COMM)

$118,600 COMM_Key

Monroe Monroe  County Municipal  Technical  Assistance

BRC-­‐TAG-­‐11.5-­‐26

$50,000 $50,000 11.5 Education  and  Training  (COMM)

$100,000 COMM_Key

Monroe Mount  Pocono  Borough

Deerfield  Oak  Street  Park

BRC-­‐PRD-­‐13.3-­‐402

$50,000 $50,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$100,000 COMM_Key

Monroe Natural  Lands  Trust,  Inc.  

Camp  Acahela  Conservation  Easement

BRC-­‐LTA-­‐13-­‐31

$417,200 $400,000 13 Open  Space  Acquisition  (LT)

$986,300 LT_Key

Page 398: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  398  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Monroe Natural  Lands  Trust,  Inc.  

Resica  Falls  Conservation  Easement

BRC-­‐LTA-­‐10-­‐15

$550,000 $500,000 10 Critical  Habitat  Acquisition  (LT)

$1,121,000 LT_Key

Monroe Natural  Lands  Trust,  Inc.  

Resica  Falls  Reservation  Phase  II

BRC-­‐LTA-­‐11-­‐19

$600,000 $400,000 11 Critical  Habitat  Acquisition  (LT)

$1,249,500 LT_Key

Monroe Paradise  Township Echo  Property  Acquisition

BRC-­‐ACQ-­‐16-­‐26

$1,776,250 $1,400,000 16 Acquisition  (COMM)

$4,211,250 COMM_Key

Monroe Paradise  Township Knauf  Property  Acquisition

BRC-­‐ACQ-­‐12.5-­‐8

$150,000 $150,000 12.5 Acquisition  (COMM)

$300,000 COMM_Key

Monroe Paradise  Township Regional  Recreational  Land  Acquisition

BRC-­‐ACQ-­‐8-­‐145

$380,880 $330,000 8 Acquisition  (COMM)

$786,900 COMM_Key

Monroe Pocono  Area  Recreation  Commission  

Skywood  Park  Master  Site  Plan

BRC-­‐TAG-­‐12.5-­‐9

$15,000 $15,000 12.5 Master  Site  Plans  (COMM)

$30,000 COMM_Key

Monroe Pocono  Heritage  Land  Trust  

Cherry  Valley  Acquisition

BRC-­‐LTA-­‐8-­‐14

$141,000 $100,000 8 Open  Space  Acquisition  (LT)

$282,000 LT_Key

Monroe Pocono  Heritage  Land  Trust  

Dewey  Acquisition BRC-­‐LTA-­‐17-­‐58

$318,921 $318,000 17 Open  Space  Acquisition  (LT)

$637,842 LT_Key

Monroe Pocono  Heritage  Land  Trust  

Henry's  Crossing  Estates  Acquisition

BRC-­‐LTA-­‐18-­‐16

$518,815 $518,000 18 Open  Space  Acquisition  (LT)

$1,037,630 LT_Key

Monroe Pocono  Heritage  Land  Trust  

Jonas  Mountain  (Gower  Property)

BRC-­‐LTA-­‐9-­‐20

$126,000 $124,000 9 Critical  Habitat  Acquisition  (LT)

$251,600 LT_Key

Page 399: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  399  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Monroe Pocono  Heritage  Land  Trust  

Walker  Fieldstone  Farm  Acquisition

BRC-­‐LTA-­‐13.6-­‐615

$249,800 $248,000 13.6 Open  Space  Acquisition  (LT)

$499,500 LT_Key

Monroe Pocono  Township Mountain  View  Park BRC-­‐PRD-­‐13-­‐136

$43,000 $43,000 13 Park  Rehabilitation  and  Development  (COMM)

$88,000 COMM_Key

Monroe Polk  Township Gower  Tract  Acquisition

BRC-­‐ACQ-­‐10-­‐188

$258,300 $175,000 10 Acquisition  (COMM)

$516,600 COMM_Key

Monroe Smithfield  Township E.  Monroe  Regional  Acquisition-­‐Shawnee  Tract

BRC-­‐ACQ-­‐9-­‐191

$403,500 $175,000 9 Acquisition  (COMM)

$809,500 COMM_Key

Monroe Smithfield  Township Marshall  Falls  Property  Acq.

BRC-­‐ACQ-­‐12-­‐77

$130,000 $130,000 12 Acquisition  (COMM)

$260,000 COMM_Key

Monroe Smithfield  Township Marshalls  Falls  Property  Master  Site  Plan

BRC-­‐TAG-­‐17-­‐21

$12,000 $12,000 17 Master  Site  Plans  (COMM)

$24,000 COMM_Key

Monroe Smithfield  Township Minisink  Park KEY-­‐ACQ-­‐3-­‐196

$50,000 $50,000 3 Acquisition  (COMM)

$100,000 COMM_Key

Monroe Smithfield  Township Minisink  Park  -­‐  Phase  I

KEY-­‐PRD-­‐4-­‐142

$25,000 $25,000 4 Park  Rehabilitation  and  Development  (COMM)

$110,000 COMM_Key

Monroe Stroud  Region  Open  Space  &  Recreation  Commission  

Glen  to  Glen  Trail  Feasibility  Study  -­‐  Planning

BRC-­‐TAG-­‐17-­‐23

$10,000 $10,000 17 Trail  Study  (COMM)

$20,000 COMM_Key

Page 400: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  400  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Monroe Stroud  Region  Open  Space  &  Recreation  Commission  

Regional  Parks  Study  &  Master  Plan

BRC-­‐TAG-­‐12.5-­‐10

$25,000 $25,000 12.5 Master  Site  Plans  (COMM)

$50,000 COMM_Key

Monroe Stroud  Region  Open  Space  &  Recreation  Commission  

Two  Pools BRC-­‐PRD-­‐13-­‐435

$75,000 $75,000 13 Park  Rehabilitation  and  Development  (COMM)

$174,900 COMM_Key

Monroe Stroud  Township Brodhead  Creek  Corridor

KEY-­‐ACQ-­‐3-­‐209

$59,000 $59,000 3 Acquisition  (COMM)

$119,600 COMM_Key

Monroe Stroud  Township Greenway  Plan BRC-­‐TAG-­‐7-­‐184

$30,000 $30,000 7 Greenway  Plans  (COMM)

$60,000 COMM_Key

Monroe Stroud  Township HSPS  Regional  Comp.  Land  Use  Plan

BRC-­‐TAG-­‐8-­‐235

$25,500 $25,000 8 Conservation/Sound  Land  Use  (COMM)

$100,000 COMM_Key

Monroe Stroud  Township Master  Site  Dev.  Plan  &  Greenway  Study

KEY-­‐TAG-­‐2-­‐151

$10,000 $10,000 2 Master  Site  Plans  (COMM)

$20,500 COMM_Key

Monroe Stroud  Township McMichael  Creek KEY-­‐ACQ-­‐4-­‐149

$141,000 $100,000 4 Acquisition  (COMM)

$282,000 COMM_Key

Monroe Stroud  Township Norton  Farm  Acquisition

BRC-­‐ACQ-­‐13.6-­‐583

$250,000 $250,000 13.6 Acquisition  (COMM)

$701,500 COMM_Key

Monroe Stroud  Township Pocono  Greenway  Pedestrian  Bridge  -­‐  Development

BRC-­‐PRT-­‐18-­‐187

$360,272 $195,028 18 Construction $460,272 COMM_Key

Monroe Stroud  Township Regional  Comp.  Rec.,  Park  &  Open  Space  Plan

KEY-­‐TAG-­‐5-­‐193

$25,000 $25,000 5 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$50,000 COMM_Key

Page 401: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  401  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Monroe Stroud  Township Tott's  Gap  Trailhead  for  Appalachian  Trail

BRC-­‐ACQ-­‐7-­‐185

$20,274 $20,000 7 Acquisition  (COMM)

$40,548 COMM_Key

Monroe Stroudsburg  Borough

Circuit  Rider BRC-­‐TAG-­‐10-­‐2

$98,668 $98,668 10 Circuit  Rider  (COMM)

$166,000 COMM_Key

Monroe Stroudsburg  Borough

Community  Pool KEY-­‐PRD-­‐5-­‐194

$100,000 $100,000 5 Park  Rehabilitation  and  Development  (COMM)

$250,000 COMM_Key

Monroe Stroudsburg  Borough

Peeney  Property  Acquisition

BRC-­‐ACQ-­‐13-­‐242

$190,800 $190,800 13 Acquisition  (COMM)

$381,600 COMM_Key

Monroe The  Nature  Conservancy  

Bryson  Tract  Acquisition  -­‐  (Cranberry  Bog)

BRC-­‐LTA-­‐11-­‐25

$340,000 $300,000 11 Open  Space  Acquisition  (LT)

$600,000 LT_Key

Monroe The  Nature  Conservancy  

Cherry  Creek  Valley  Site  Conservation  Plan

KEY-­‐LTP-­‐5-­‐18

$16,066 $16,000 5 Open  Space  Planning  (LT)

$34,700 LT_Key

Monroe The  Nature  Conservancy  

Lake  Mineola  Marsh KEY-­‐LTA-­‐4-­‐19

$206,250 $150,000 4 Critical  Habitat  Acquisition  (LT)

$427,500 LT_Key

Monroe The  Nature  Conservancy  

Long  Pond/Tunkhannock  Creek

KEY-­‐LTA-­‐1-­‐12

$1,000,000 $550,000 1 Critical  Habitat  Acquisition  (LT)

$2,000,000 LT_Key

Monroe The  Nature  Conservancy  

Pocono  Till  Barrens/Long  Pond

KEY-­‐LTA-­‐5-­‐20

$262,000 $255,000 5 Critical  Habitat  Acquisition  (LT)

$524,000 LT_Key

Monroe The  Nature  Conservancy  

Two  Mile  Run KEY-­‐LTA-­‐4-­‐21

$37,500 $35,000 4 Critical  Habitat  Acquisition  (LT)

$75,000 LT_Key

Page 402: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  402  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Monroe The  Nature  Conservancy  

Two  Mile  Run  Nature  Preserve

KEY-­‐LTA-­‐1-­‐13

$150,000 $150,000 1 Critical  Habitat  Acquisition  (LT)

$300,000 LT_Key

Monroe The Nature Conservancy

Weiss Land Acquisiiton (Tannersville Cranberry Bog)

BRC-LTA-19-29

$309,850.00 $306,700.00 19 Critical Habitat Acquisition (LT)

$619,700.00 LT_Key

Monroe The Nature Conservancy

Weiss Land Acquisiiton (Tannersville Cranberry Bog)

BRC-LTA-19-29

$309,850.00 $306,700.00 19 Critical Habitat Acquisition (LT)

$619,700.00 LT_Key

Monroe The Nature Conservancy

Weiss Land Acquisiiton (Tannersville Cranberry Bog)

BRC-LTA-19-29

$309,850.00 $306,700.00 19 Critical Habitat Acquisition (LT)

$619,700.00 LT_Key

Monroe Tobyhanna  Township

Creekview  Property  Acquisition

BRC-­‐ACQ-­‐14-­‐72

$230,450 $230,000 14 Acquisition  (COMM)

$460,900 COMM_Key

Monroe Tobyhanna  Township

Peer  to  Peer BRC-­‐TAG-­‐13-­‐37

$10,000 $10,000 13 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$11,000 COMM_Key

Monroe Tobyhanna  Township

Two  Mile  Run KEY-­‐ACQ-­‐1-­‐136

$122,000 $100,000 1 Acquisition  (COMM)

$244,000 COMM_Key

Monroe Tunkhannock  Township

Community  Vision,  Strategic  Plan

BRC-­‐TAG-­‐6-­‐180

$22,500 $42,500 6 Conservation/Sound  Land  Use  (COMM)

$85,000 COMM_Key

Monroe Tunkhannock  Township

Moyer  Property  and  Kim  Property  Acquisitions

BRC-­‐ACQ-­‐12-­‐274

$320,000 $320,000 12 Acquisition  (COMM)

$640,000 COMM_Key

Monroe Tunkhannock  Township

Silver  Tract  Acquisition  (Fern  Ridge  Bog)

BRC-­‐ACQ-­‐13.6-­‐584

$320,000 $260,000 13.6 Acquisition  (COMM)

$640,000 COMM_Key

Page 403: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  403  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Monroe West  End  Park  and  Open  Space  Commission  

West  End  Regional  Park-­‐Phase  1

BRC-­‐PRD-­‐16-­‐173

$65,000 $65,000 16 Park  Rehabilitation  and  Development  (COMM)

$133,055 COMM_Key

Monroe Wildlands  Conservancy,  Inc.  

Haase  Property  Acquisition

BRC-­‐LTA-­‐18-­‐24

$133,600 $133,500 18 Open  Space  Acquisition  (LT)

$267,200 LT_Key

Monroe Wildlands  Conservancy,  Inc.  

Two  Mile  Run  Nature  Preserve

KEY-­‐LTA-­‐1-­‐18

$773,800 $500,000 1 Critical  Habitat  Acquisition  (LT)

$1,300,000 LT_Key

Monroe,  Pike Lehman  Township Bushkill  Village  Conservation  &  Management  Plan

BRC-­‐TAG-­‐16-­‐62

$30,000 $30,000 16 Trail  Study  (COMM)

$190,000 COMM_Key

Montgomery Abington  Township Alverthorpe  Manor  Cultural  Park

BRC-­‐PRD-­‐11-­‐3

$223,000 $136,900 11 Park  Rehabilitation  and  Development  (COMM)

$446,000 COMM_Key

Montgomery Abington  Township Demonstration  Trail  -­‐  Phase  I

KEY-­‐PRD-­‐4-­‐4

$114,330 $114,000 4 Park  Rehabilitation  and  Development  (COMM)

$228,660 COMM_Key

Montgomery Abington  Township Rubicam  Avenue  Park

KEY-­‐PRD-­‐1-­‐1

$25,750 $25,700 1 Park  Rehabilitation  and  Development  (COMM)

$51,500 COMM_Key

Montgomery Bridgeport  Borough Schuylkill  Riverfront  Greenway  Trail  Plan

BRC-­‐TAG-­‐11-­‐193

$30,000 $30,000 11 Greenway  Plans  (COMM)

$60,000 COMM_Key

Page 404: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  404  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Montgomery Cheltenham  Township

Curtis  Arboretum  Conservation  and  Landscape  Management  Plan

BRC-­‐TAG-­‐17-­‐5

$20,000 $20,000 17 Conservation/Sound  Land  Use  (COMM)

$40,000 COMM_Key

Montgomery Cheltenham  Township

High  School  Park  Master  Site  Plan

BRC-­‐TAG-­‐13-­‐180

$12,500 $12,500 13 Master  Site  Plans  (COMM)

$25,000 COMM_Key

Montgomery Cheltenham  Township

High  School  Park-­‐  Phase  2-­‐  Development

BRC-­‐PRD-­‐18-­‐55

$100,000 $100,000 18 Park  Rehabilitation  and  Development  (COMM)

$200,000 COMM_Key

Montgomery Cheltenham  Township

High  School  Park-­‐Development

BRC-­‐PRD-­‐15-­‐53

$150,000 $125,000 15 Park  Rehabilitation  and  Development  (COMM)

$386,196 COMM_Key

Montgomery Cheltenham  Township

Richard  Wall  Park  Master  Plan

BRC-­‐TAG-­‐10-­‐149

$12,500 $12,500 10 Master  Site  Plans  (COMM)

$25,000 COMM_Key

Montgomery Cheltenham Township Rock Creek Greenway Implementation Project

BRC-RCI-19-156

$100,000.00 $100,000.00 19 Implementation (RIV)

$200,000.00 COMM_Key

Montgomery Cheltenham Township Rock Creek Greenway Implementation Project

BRC-RCI-19-156

$100,000.00 $100,000.00 19 Implementation (RIV)

$200,000.00 COMM_Key

Montgomery Cheltenham Township Rock Creek Greenway Implementation Project

BRC-RCI-19-156

$100,000.00 $100,000.00 19 Implementation (RIV)

$200,000.00 COMM_Key

Page 405: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  405  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Montgomery Cheltenham  Township

Tookany  Creek  Invasive  Species  Management

BRC-­‐RCD-­‐12-­‐5

$75,000 $75,000 12 Development  (RIV)

$150,000 RIVER_Key

Montgomery Cheltenham  Township

Tookany  Creek  Streambank  Restoration  &  Pedestrian  Path

BRC-­‐PRD-­‐12-­‐136

$200,000 $200,000 12 Park  Rehabilitation  and  Development  (COMM)

$795,000 COMM_Key

Montgomery Cheltenham  Township

Tookany  Creek  Trail BRC-­‐PRD-­‐6-­‐37

$198,627 $298,000 6 Park  Rehabilitation  and  Development  (COMM)

$467,976 COMM_Key

Montgomery Cheltenham  Township

Tookany  Creek  Watershed  Plan

KEY-­‐RCP-­‐5-­‐4

$25,000 $25,000 5 Planning  (RIV) $76,260 RIVER_Key

Montgomery Collegeville  Borough Hunsberger  Woods KEY-­‐PRD-­‐4-­‐34

$8,067 $8,000 4 Park  Rehabilitation  and  Development  (COMM)

$16,134 COMM_Key

Montgomery Collegeville  Borough Main  Street  Beautification  Project

BRC-­‐SC-­‐11-­‐112

$20,000 $20,000 11 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Montgomery East  Greenville  Borough

Community  Park KEY-­‐SC-­‐4-­‐48 $19,800 $19,800 4 Small  Communities/Small  Projects  (COMM)

$19,800 COMM_Key

Page 406: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  406  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Montgomery Franconia  Township Forest  Meadow  Park  -­‐  Phase  1  Development

BRC-­‐PRD-­‐12-­‐154

$121,100 $121,000 12 Park  Rehabilitation  and  Development  (COMM)

$272,000 COMM_Key

Montgomery Franconia  Township Forrest  Meadow  Park

BRC-­‐TAG-­‐6-­‐69

$20,000 $20,000 6 Master  Site  Plans  (COMM)

$40,000 COMM_Key

Montgomery Hatboro  Borough Peer-­‐to-­‐Peer BRC-­‐TAG-­‐10-­‐8

$7,500 $7,500 10 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$8,250 COMM_Key

Montgomery Hatfield  Borough Chestnut  Street  Trail BRC-­‐SC-­‐13.3-­‐304

$20,000 $20,000 13.3 Small  Communities/Small  Projects  (COMM)

$23,000 COMM_Key

Montgomery Hatfield  Borough Liberty  Bell  Trail KEY-­‐RTD-­‐5-­‐25

$25,000 $25,000 5 Rail  Rehabilitation  and  Development  (RT)

$50,000 RT_Key

Montgomery Hatfield  Township Chestnut  Street  Trail  -­‐  Central  Section  Development

BRC-­‐PRD-­‐12-­‐158

$100,000 $100,000 12 Park  Rehabilitation  and  Development  (COMM)

$200,000 COMM_Key

Montgomery Hatfield  Township Greenway  and  Trails  Network  Master  Plan

BRC-­‐RTP-­‐12.5-­‐1

$20,000 $20,000 12.5 Trail  Study  (COMM)

$40,000 RT_Key

Page 407: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  407  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Montgomery Hatfield  Township Hatfield  Community  Park

KEY-­‐PRD-­‐5-­‐84

$86,673 $76,600 5 Park  Rehabilitation  and  Development  (COMM)

$173,345 COMM_Key

Montgomery Hatfield  Township Kratz  Property  Acquisition

BRC-­‐ACQ-­‐14-­‐59

$229,000 $229,000 14 Acquisition  (COMM)

$458,000 COMM_Key

Montgomery Hatfield  Township Pool  Feasibility  Study BRC-­‐TAG-­‐8-­‐82

$9,000 $9,000 8 Feasibility  Studies  (COMM)

$18,000 COMM_Key

Montgomery Hatfield  Township School  Road  Park KEY-­‐PRD-­‐1-­‐58

$70,697 $70,600 1 Park  Rehabilitation  and  Development  (COMM)

$141,394 COMM_Key

Montgomery Hatfield  Township School  Road  Park  -­‐  Development

BRC-­‐PRD-­‐17-­‐123

$138,000 $138,000 17 Park  Rehabilitation  and  Development  (COMM)

$276,000 COMM_Key

Montgomery Horsham  Township Cedar  Hill  Road  Park  -­‐  Phase  I

KEY-­‐PRD-­‐4-­‐66

$100,000 $75,000 4 Park  Rehabilitation  and  Development  (COMM)

$265,800 COMM_Key

Montgomery Horsham  Township Comp  and  Rec  Plan  Update

BRC-­‐TAG-­‐7-­‐86

$17,500 $10,000 7 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$35,000 COMM_Key

Page 408: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  408  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Montgomery Horsham  Township Everybody's  Playground  and  Picnic  Area

BRC-­‐PRD-­‐9-­‐97

$100,000 $40,000 9 Park  Rehabilitation  and  Development  (COMM)

$240,300 COMM_Key

Montgomery Horsham  Township Kohler  Park  -­‐  Development

BRC-­‐PRD-­‐17-­‐124

$150,000 $144,500 17 Park  Rehabilitation  and  Development  (COMM)

$300,000 COMM_Key

Montgomery Horsham  Township Kohler  Park  Master  Site  Plan

BRC-­‐TAG-­‐13.3-­‐474

$25,000 $25,000 13.3 Master  Site  Plans  (COMM)

$50,000 COMM_Key

Montgomery Horsham  Township Master  Site  Development  Plan

KEY-­‐TAG-­‐2-­‐64

$10,500 $10,500 2 Master  Site  Plans  (COMM)

$21,000 COMM_Key

Montgomery Lansdale  Borough Fourth  Street  Swimming  Pool

KEY-­‐PRD-­‐5-­‐107

$300,000 $100,000 5 Park  Rehabilitation  and  Development  (COMM)

$600,000 COMM_Key

Montgomery Lansdale  Borough Swimming  Pool  Feasibility  Study

KEY-­‐TAG-­‐2-­‐75

$7,500 $7,500 2 Feasibility  Studies  (COMM)

$15,000 COMM_Key

Montgomery Lansdale  Borough White's  Road  Park KEY-­‐PRD-­‐1-­‐70

$37,750 $37,700 1 Park  Rehabilitation  and  Development  (COMM)

$75,500 COMM_Key

Montgomery Lansdale  Borough Wissahickon  Creek-­‐Infiltration  Basin  &  Riparian  Buffer

BRC-­‐RCD-­‐12-­‐8

$223,700 $223,000 12 Development  (RIV)

$447,400 RIVER_Key

Page 409: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  409  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Montgomery Limerick  Township Greenways  and  Trails  NetworkPlan

BRC-­‐TAG-­‐17-­‐11

$25,000 $25,000 17 Greenway  Plans  (COMM)

$50,000 COMM_Key

Montgomery Limerick  Township Kurylo  Acquisition BRC-­‐ACQ-­‐13.3-­‐577

$1,252,100 $1,250,000 13.3 Acquisition  (COMM)

$3,183,800 COMM_Key

Montgomery Limerick  Township Limerick  Community  Park

KEY-­‐PRD-­‐5-­‐113

$52,000 $52,000 5 Park  Rehabilitation  and  Development  (COMM)

$104,000 COMM_Key

Montgomery Limerick  Township Master  Site  Development  Plan

KEY-­‐TAG-­‐3-­‐115

$15,000 $15,000 3 Master  Site  Plans  (COMM)

$30,000 COMM_Key

Montgomery Lower  Frederick  Township

Peer  to  Peer BRC-­‐TAG-­‐10-­‐3

$7,500 $7,500 10 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$8,250 COMM_Key

Montgomery Lower  Frederick  Township

Township  Park KEY-­‐SC-­‐5-­‐114

$20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$23,300 COMM_Key

Montgomery Lower  Gwynedd  Township

Circuit  Rider-­‐Year  1 KEY-­‐TAG-­‐4-­‐88

$35,000 $35,000 4 Circuit  Rider  (COMM)

$35,000 COMM_Key

Montgomery Lower  Gwynedd  Township

Henkel  Property  Master  Plan

BRC-­‐TAG-­‐6-­‐97

$12,500 $12,500 6 Master  Site  Plans  (COMM)

$25,000 COMM_Key

Montgomery Lower  Gwynedd  Township

Penllyn  Woods-­‐Phase  I

KEY-­‐PRD-­‐2-­‐86

$100,000 $100,000 2 Park  Rehabilitation  and  Development  (COMM)

$489,633 COMM_Key

Page 410: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  410  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Montgomery Lower  Gwynedd  Township

Penn  Ambler  Park BRC-­‐PRD-­‐10-­‐194

$200,000 $200,000 10 Park  Rehabilitation  and  Development  (COMM)

$848,500 COMM_Key

Montgomery Lower  Merion  Township

Comprehensive  Recreation,  Parks  and  Open  Space  Plan  (Update)

BRC-­‐TAG-­‐13-­‐191

$40,000 $35,000 13 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$80,000 COMM_Key

Montgomery Lower  Merion  Township

Flat  Rock  Park BRC-­‐PRD-­‐13.3-­‐387

$140,000 $140,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$280,000 COMM_Key

Montgomery Lower  Merion  Township

Master  Site    Development  Plan

KEY-­‐TAG-­‐3-­‐118

$11,000 $12,700 3 Master  Site  Plans  (COMM)

$47,400 COMM_Key

Montgomery Lower  Merion  Township

Master  Site    Development  Plan

KEY-­‐TAG-­‐3-­‐118

$11,000 $11,000 3 Master  Site  Plans  (COMM)

$47,400 COMM_Key

Montgomery Lower  Merion  Township

Multiple  Master  Plans

KEY-­‐TAG-­‐5-­‐116

$23,088 $23,000 5 Master  Site  Plans  (COMM)

$46,176 COMM_Key

Montgomery Lower  Merion  Township

Rolling  Hill  Park KEY-­‐PRD-­‐2-­‐88

$216,500 $150,000 2 Park  Rehabilitation  and  Development  (COMM)

$433,000 COMM_Key

Montgomery Lower  Merion  Township

Schuylkill  River  West  Trail  Feasibility  Study

BRC-­‐TAG-­‐12-­‐245

$46,000 $46,000 12 Trail  Study  (COMM)

$95,000 COMM_Key

Page 411: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  411  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Montgomery Lower  Merion  Township

Shortridge  Memorial  Park  Streambank  Stabilization

BRC-­‐RCI-­‐17-­‐168

$115,500 $115,500 17 Implementation  (RIV)

$237,525 COMM_Key

Montgomery Lower  Merion  Township

Trail  Feasibility  Study BRC-­‐TAG-­‐7-­‐106

$17,500 $17,000 7 Feasibility  Studies  (COMM)

$35,000 COMM_Key

Montgomery Lower  Merion  Township

Warner  Avenue  Playground  Plan

BRC-­‐TAG-­‐11-­‐220

$7,300 $7,200 11 Master  Site  Plans  (COMM)

$14,500 COMM_Key

Montgomery Lower Moreland Township

Lower Moreland Recreation Complex - Phase 2 -Development

BRC-PRD-19-93

$149,442.00 $149,000.00 19 Park Rehabilitation and Development (COMM)

$298,885.00 COMM_Key

Montgomery Lower Moreland Township

Lower Moreland Recreation Complex - Phase 2 -Development

BRC-PRD-19-93

$149,442.00 $149,000.00 19 Park Rehabilitation and Development (COMM)

$298,885.00 COMM_Key

Montgomery Lower Moreland Township

Lower Moreland Recreation Complex - Phase 2 -Development

BRC-PRD-19-93

$149,442.00 $149,000.00 19 Park Rehabilitation and Development (COMM)

$298,885.00 COMM_Key

Montgomery Lower  Moreland  Township

Philmont  Avenue  Corridor  and  Greenway  Plan

BRC-­‐TAG-­‐12-­‐246

$20,000 $20,000 12 Feasibility  Studies  (COMM)

$44,400 COMM_Key

Montgomery Lower  Pottsgrove  Township

Peer-­‐to-­‐Peer BRC-­‐TAG-­‐10-­‐202

$10,000 $10,000 10 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$11,000 COMM_Key

Page 412: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  412  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Montgomery Lower  Pottsgrove  Township

Recreation  Area KEY-­‐PRD-­‐1-­‐75

$42,291 $42,200 1 Park  Rehabilitation  and  Development  (COMM)

$84,582 COMM_Key

Montgomery Lower  Pottsgrove  Township

Sanatoga  Park BRC-­‐PRD-­‐11-­‐51

$127,700 $127,000 11 Park  Rehabilitation  and  Development  (COMM)

$255,400 COMM_Key

Montgomery Lower  Pottsgrove  Township

Sanatoga  Park  Bandshell

KEY-­‐PRD-­‐3-­‐119

$34,900 $34,900 3 Park  Rehabilitation  and  Development  (COMM)

$69,800 COMM_Key

Montgomery Lower  Pottsgrove  Township

Sanatoga  Sports  Complex

KEY-­‐PRD-­‐5-­‐117

$70,000 $70,000 5 Park  Rehabilitation  and  Development  (COMM)

$140,000 COMM_Key

Montgomery Lower  Pottsgrove  Township

Snell  &  Norton/Gerald  Richards  Park  Master  Site  Plans

BRC-­‐TAG-­‐13.3-­‐478

$39,000 $39,000 13.3 Master  Site  Plans  (COMM)

$78,000 COMM_Key

Montgomery Lower  Providence  Township

Harry  F.  Hoy  Memorial  Park

BRC-­‐PRD-­‐13-­‐119

$95,300 $95,000 13 Park  Rehabilitation  and  Development  (COMM)

$190,500 COMM_Key

Page 413: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  413  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Montgomery Lower  Providence  Township

Harry  F.  Hoy  Memorial  Park

BRC-­‐PRD-­‐6-­‐98

$16,205 $16,200 6 Park  Rehabilitation  and  Development  (COMM)

$32,410 COMM_Key

Montgomery Lower  Salford  Township

Multi-­‐Use  Trail  Feasibility  Study

BRC-­‐TAG-­‐18-­‐157

$30,512 $30,500 18 Trail  Study  (COMM)

$61,024 COMM_Key

Montgomery Montgomery  County County  Park  Feasibility  Study

KEY-­‐TAG-­‐4-­‐105

$55,000 $40,000 4 Feasibility  Studies  (COMM)

$110,000 COMM_Key

Montgomery Montgomery  County Cross  County  Trail  Feasibility  Study

KEY-­‐TAG-­‐1-­‐87

$20,000 $20,000 1 Feasibility  Studies  (COMM)

$40,000 COMM_Key

Montgomery Montgomery  County East  Penn  Rail  Line  -­‐  Acquisition

BRC-­‐RTA-­‐17-­‐209

$216,473 $216,400 17 Acquisition  (RT) $1,082,367 COMM_Key

Montgomery Montgomery  County Green  Lane  Reservoir  Park

KEY-­‐ACQ-­‐3-­‐143

$185,900 $100,000 3 Acquisition  (COMM)

$371,800 COMM_Key

Montgomery Montgomery  County Liberty  Bell  Trolley  Trail  Feasibility  Study

KEY-­‐RTP-­‐5-­‐9 $30,000 $30,000 5 Feasibility  Studies  (RT)

$60,000 RT_Key

Montgomery Montgomery  County Master  Site  Development  Plan

KEY-­‐TAG-­‐2-­‐106

$60,000 $30,000 2 Master  Site  Plans  (COMM)

$120,000 COMM_Key

Montgomery Montgomery  County Natural  Areas  Inventory  Implementation  Plan

BRC-­‐TAG-­‐10-­‐195

$50,000 $50,000 10 Natural  Areas  Inventories  (COMM)

$116,200 COMM_Key

Montgomery Montgomery  County Open  Space  System  Management  Plan

BRC-­‐TAG-­‐11.5-­‐40

$50,000 $50,000 11.5 Conservation/Sound  Land  Use  (COMM)

$100,000 COMM_Key

Page 414: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  414  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Montgomery Montgomery  County Schuylkill  Canal  Tow  Path  Restoration/Schuylkill  River  Trail  Extension  -­‐  Development

BRC-­‐PRD-­‐17-­‐140

$579,420 $325,000 17 Park  Rehabilitation  and  Development  (COMM)

$1,158,839 COMM_Key

Montgomery Montgomery  County Schuylkill  River  Trail KEY-­‐RTD-­‐5-­‐10

$40,000 $40,000 5 Rail  Rehabilitation  and  Development  (RT)

$80,000 RT_Key

Montgomery Montgomery  County Schuylkill  River  Trail  -­‐  Pottstown  Segment  -­‐  Development

BRC-­‐PRD-­‐17-­‐75

$199,025 $199,000 17 Park  Rehabilitation  and  Development  (COMM)

$398,050 COMM_Key

Montgomery Montgomery  County Upper  Schuylkill  Valley  Park  -­‐  Development

BRC-­‐PRD-­‐17-­‐141

$217,683 $202,000 17 Park  Rehabilitation  and  Development  (COMM)

$435,365 COMM_Key

Montgomery Montgomery  County Wissahickon  Trail  Link

BRC-­‐PRD-­‐5-­‐135

$50,000 $50,000 5 Park  Rehabilitation  and  Development  (COMM)

$400,000 COMM_Key

Montgomery Montgomery  County  Lands  Trust  

Fellowship  Farm  Conservation  Easement

BRC-­‐LTA-­‐12-­‐30

$336,000 $336,000 12 Open  Space  Acquisition  (LT)

$681,800 LT_Key

Page 415: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  415  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Montgomery Montgomery  County  Lands  Trust  

Rogers  Property  Acquisition

BRC-­‐LTA-­‐17-­‐56

$708,200 $678,000 17 Open  Space  Acquisition  (LT)

$1,416,450 LT_Key

Montgomery Montgomery  County  Lands  Trust  

Williams  Property  Acquisition

BRC-­‐LTA-­‐11-­‐17

$323,400 $285,000 11 Open  Space  Acquisition  (LT)

$654,200 LT_Key

Montgomery Montgomery  County  Planning  Commission  County

Sandy  Run  Creek  Conservation  Master  Plan

KEY-­‐RCP-­‐96-­‐06

$15,000 $15,000 3 Planning  (RIV) $30,000 RIVER_Key

Montgomery Montgomery  Township

Comprehensive  Rec.  &  Park  Plan  Update

KEY-­‐TAG-­‐2-­‐107

$8,000 $8,000 2 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$16,000 COMM_Key

Montgomery Montgomery  Township

Township  Park KEY-­‐PRD-­‐1-­‐88

$18,897 $18,800 1 Park  Rehabilitation  and  Development  (COMM)

$37,794 COMM_Key

Montgomery National  Audubon  Society,  Inc.  

Audubon  Center  Conservation  Management  Plan

BRC-­‐LTP-­‐12-­‐37

$83,500 $83,500 12 Open  Space  Planning  (LT)

$167,100 LT_Key

Montgomery Natural  Lands  Trust,  Inc.  

Driscoll  Acquisition BRC-­‐LTA-­‐13.3-­‐525

$695,600 $690,000 13.3 Critical  Habitat  Acquisition  (LT)

$2,731,200 LT_Key

Montgomery Natural  Lands  Trust,  Inc.  

Musser  Scout  Reservation

BRC-­‐LTA-­‐7-­‐15

$800,000 $1,125,000 7 Critical  Habitat  Acquisition  (LT)

$2,250,000 LT_Key

Montgomery Natural  Lands  Trust,  Inc.  

Unami  Hills KEY-­‐LTA-­‐5-­‐9 $616,055 $500,000 5 Critical  Habitat  Acquisition  (LT)

$1,300,000 LT_Key

Page 416: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  416  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Montgomery Natural  Lands  Trust,  Inc.  

Unami  Hills  Conservation  Plan

KEY-­‐LTP-­‐3-­‐12

$14,000 $14,000 3 Critical  Habitat  Planning  (LT)

$35,000 LT_Key

Montgomery New  Hanover  Township

Community  Park KEY-­‐PRD-­‐5-­‐144

$45,000 $45,000 5 Park  Rehabilitation  and  Development  (COMM)

$92,000 COMM_Key

Montgomery New  Hanover  Township

Layfield  Park  Master  Site  Plan

BRC-­‐TAG-­‐11-­‐227

$28,000 $28,000 11 Master  Site  Plans  (COMM)

$56,000 COMM_Key

Montgomery Norristown  Borough Riverfront  Park  Master  Site  Plan

BRC-­‐TAG-­‐14-­‐224

$15,000 $15,000 14 Master  Site  Plans  (COMM)

$30,000 COMM_Key

Montgomery Norristown  Borough Simmons  Park BRC-­‐PRD-­‐13.3-­‐404

$268,000 $200,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$536,000 COMM_Key

Montgomery Norristown  Borough Stony  Creek  and  Saw  Mill  Run  Greenways  Plan

BRC-­‐TAG-­‐17-­‐16

$25,000 $24,800 17 Greenway  Plans  (COMM)

$49,792 COMM_Key

Montgomery Norristown  Zoological  Society  

Elmwood  Park  Zoo-­‐Entrance  Pavilion  Ph  II

KEY-­‐PRD-­‐2-­‐112

$200,000 $100,000 2 Park  Rehabilitation  and  Development  (COMM)

$400,000 COMM_Key

Montgomery Norristown  Zoological  Society  

Zoo  Entrance  Pavilion

KEY-­‐ZOO-­‐94-­‐3

$200,000 $200,000 1 Zoo $400,000 COMM_Key

Page 417: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  417  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Montgomery North  Wales  Borough

Hess  Park BRC-­‐PRD-­‐13.3-­‐406

$136,000 $100,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$376,000 COMM_Key

Montgomery North  Wales  Borough

Hess  Park  Master  Site  Plan

BRC-­‐TAG-­‐11-­‐229

$7,500 $7,500 11 Master  Site  Plans  (COMM)

$15,000 COMM_Key

Montgomery North  Wales  Borough

Wee  Walers  Park-­‐  Development

BRC-­‐PRD-­‐18-­‐87

$20,000 $20,000 18 Park  Rehabilitation  and  Development  (COMM)

$115,000 COMM_Key

Montgomery Pennsburg  Borough Two  Sites KEY-­‐SC-­‐5-­‐158

$19,927 $19,900 5 Small  Communities/Small  Projects  (COMM)

$24,708 COMM_Key

Montgomery Pennypack  Ecological  Restoration  Trust  

Bethayres  Woods KEY-­‐LTA-­‐5-­‐15

$200,000 $200,000 5 Open  Space  Acquisition  (LT)

$950,000 LT_Key

Montgomery Pennypack  Ecological  Restoration  Trust  

Raytharn  Farm KEY-­‐LTA-­‐2-­‐13

$500,000 $500,000 2 Open  Space  Acquisition  (LT)

$1,000,000 LT_Key

Montgomery Pennypack  Ecological  Restoration  Trust  

Raytharn  Farm KEY-­‐LTA-­‐3-­‐19

$750,000 $350,000 3 Open  Space  Acquisition  (LT)

$3,000,000 LT_Key

Montgomery Perkiomen  Township Township  Park KEY-­‐SC-­‐3-­‐168

$20,000 $20,000 3 Small  Communities/Small  Projects  (COMM)

$52,700 COMM_Key

Page 418: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  418  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Montgomery Perkiomen  Valley  Watershed  Association  

Spring  Mountain  Master  Plan

KEY-­‐LTP-­‐4-­‐16

$20,000 $20,000 4 Critical  Habitat  Planning  (LT)

$1,367,400 LT_Key

Montgomery Plymouth  Township Harriet  Wetherill  Park

BRC-­‐PRD-­‐13.3-­‐414

$250,000 $200,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$544,100 COMM_Key

Montgomery Plymouth  Township Harriet  Wetherill  Park  Conservation  and  Management  Plan

BRC-­‐TAG-­‐16-­‐69

$45,000 $45,000 16 Conservation/Sound  Land  Use  (COMM)

$90,000 COMM_Key

Montgomery Plymouth  Township Harriett  Wetherill  Park  Master  Plan

BRC-­‐TAG-­‐11-­‐233

$25,100 $25,100 11 Master  Site  Plans  (COMM)

$50,200 COMM_Key

Montgomery Plymouth  Township Peer  to  Peer BRC-­‐TAG-­‐12-­‐271

$10,000 $10,000 12 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$11,000 COMM_Key

Montgomery Pottstown  Borough Depot  Property BRC-­‐ACQ-­‐6-­‐153

$38,500 $38,500 6 Acquisition  (COMM)

$77,000 COMM_Key

Montgomery Pottstown  Borough Memorial  Park  Development

BRC-­‐PRD-­‐12-­‐190

$229,000 $229,000 12 Park  Rehabilitation  and  Development  (COMM)

$458,000 COMM_Key

Montgomery Pottstown  Borough Pedestrain  Underpass

BRC-­‐PRD-­‐10-­‐134

$65,000 $65,000 10 Park  Rehabilitation  and  Development  (COMM)

$325,000 COMM_Key

Page 419: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  419  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Montgomery Rockledge  Borough Rockledge  Avenue  Park

BRC-­‐SC-­‐9-­‐177

$20,000 $30,000 9 Small  Communities/Small  Projects  (COMM)

$40,000 COMM_Key

Montgomery Rockledge  Borough Two  Playgrounds KEY-­‐SC-­‐1-­‐116

$10,007 $10,000 1 Small  Communities/Small  Projects  (COMM)

$12,007 COMM_Key

Montgomery Royersford  Borough Riverfront  Trail BRC-­‐PRD-­‐13.3-­‐425

$150,000 $100,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$300,000 COMM_Key

Montgomery Royersford Borough Royersford Riverfront Trail and Park - Phase 2 - Development

BRC-PRD-19-110

$200,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)

$420,910.00 COMM_Key

Montgomery Royersford Borough Royersford Riverfront Trail and Park - Phase 2 - Development

BRC-PRD-19-110

$200,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)

$420,910.00 COMM_Key

Montgomery Royersford Borough Royersford Riverfront Trail and Park - Phase 2 - Development

BRC-PRD-19-110

$200,000.00 $200,000.00 19 Park Rehabilitation and Development (COMM)

$420,910.00 COMM_Key

Montgomery Royersford  Borough Victory  Park KEY-­‐SC-­‐1-­‐118

$12,000 $12,000 1 Small  Communities/Small  Projects  (COMM)

$12,000 COMM_Key

Page 420: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  420  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Montgomery Salford  Township Barrett  Property  Acquisition

BRC-­‐ACQ-­‐12.5-­‐20

$105,800 $100,000 12.5 Acquisition  (COMM)

$211,700 COMM_Key

Montgomery Salford  Township Whites  Mill  Road  Property

KEY-­‐ACQ-­‐4-­‐133

$120,000 $100,000 4 Acquisition  (COMM)

$600,000 COMM_Key

Montgomery Schwenksville  Borough

Meadow  Park  -­‐  Development

BRC-­‐SC-­‐17-­‐48

$36,327 $36,300 17 Small  Communities/Small  Projects  (COMM)

$52,654 COMM_Key

Montgomery Skippack  Township Palmer  Park BRC-­‐PRD-­‐6-­‐168

$138,300 $138,300 6 Park  Rehabilitation  and  Development  (COMM)

$276,600 COMM_Key

Montgomery Souderton  Borough Pool  Complex  Feasibility  Study

BRC-­‐TAG-­‐9-­‐192

$23,500 $23,000 9 Feasibility  Studies  (COMM)

$47,500 COMM_Key

Montgomery Souderton  Borough Souderton  Community  Pool-­‐  Rehabilitation

BRC-­‐PRD-­‐15-­‐69

$250,000 $140,000 15 Park  Rehabilitation  and  Development  (COMM)

$1,126,500 COMM_Key

Montgomery Spring-­‐Ford  Area  Council  of  Governments  

Peer-­‐to-­‐Peer KEY-­‐TAG-­‐1-­‐130

$7,200 $5,000 1 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$8,000 COMM_Key

Montgomery Spring-­‐Ford  Regional  Recreation  Commission  

Circuit  Rider  -­‐  Year  1 KEY-­‐TAG-­‐2-­‐148

$35,000 $35,000 2 Circuit  Rider  (COMM)

$35,000 COMM_Key

Page 421: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  421  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Montgomery Spring-­‐Ford  Regional  Recreation  Commission  

Circuit  Rider  -­‐  Year  2 KEY-­‐TAG-­‐3-­‐203

$27,500 $27,500 3 Circuit  Rider  (COMM)

$36,700 COMM_Key

Montgomery Springfield  Township Comp.  Recreation,  Park  &  Open  Space  Plan

BRC-­‐TAG-­‐10-­‐171

$25,000 $25,000 10 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$50,000 COMM_Key

Montgomery Telford  Borough Summit  Street  Park BRC-­‐SC-­‐7-­‐188

$29,300 $29,000 7 Small  Communities/Small  Projects  (COMM)

$48,580 COMM_Key

Montgomery Towamencin  Township

Fischer's  Park  -­‐  Development

BRC-­‐PRD-­‐17-­‐155

$300,000 $300,000 17 Park  Rehabilitation  and  Development  (COMM)

$830,000 COMM_Key

Montgomery Towamencin  Township

Fischer's  Park  Master  Site  Plan

BRC-­‐TAG-­‐14-­‐248

$25,000 $25,000 14 Master  Site  Plans  (COMM)

$50,000 COMM_Key

Montgomery Towamencin  Township

Fischer's  Park  Restoration

BRC-­‐PRD-­‐7-­‐190

$98,507 $98,000 7 Park  Rehabilitation  and  Development  (COMM)

$197,015 COMM_Key

Montgomery Towamencin  Township

Trail  System-­‐Phase  I KEY-­‐PRD-­‐2-­‐156

$90,270 $80,000 2 Park  Rehabilitation  and  Development  (COMM)

$180,541 COMM_Key

Montgomery Trappe  Borough Main  Street  Park  Plan

BRC-­‐TAG-­‐11-­‐236

$14,000 $14,000 11 Master  Site  Plans  (COMM)

$30,000 COMM_Key

Page 422: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  422  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Montgomery Trappe  Borough Pollarine  Tract BRC-­‐ACQ-­‐7-­‐191

$70,367 $70,000 7 Acquisition  (COMM)

$140,734 COMM_Key

Montgomery Trappe Borough Rambo Park - Development

BRC-SC-19-53

$38,105.00 $38,000.00 19 Small Communities/Small Projects (COMM)

$56,210.00 COMM_Key

Montgomery Trappe Borough Rambo Park - Development

BRC-SC-19-53

$38,105.00 $38,000.00 19 Small Communities/Small Projects (COMM)

$56,210.00 COMM_Key

Montgomery Trappe Borough Rambo Park - Development

BRC-SC-19-53

$38,105.00 $38,000.00 19 Small Communities/Small Projects (COMM)

$56,210.00 COMM_Key

Montgomery Trappe  Borough Rambo  Park  Development

BRC-­‐PRD-­‐12-­‐206

$204,500 $200,000 12 Park  Rehabilitation  and  Development  (COMM)

$409,000 COMM_Key

Montgomery Trappe  Borough Water  Works  Park KEY-­‐PRD-­‐5-­‐203

$81,350 $81,000 5 Park  Rehabilitation  and  Development  (COMM)

$162,700 COMM_Key

Montgomery Upper  Dublin  Township

Camp  Hill  &  Highland  Athletic  Field  Complex

KEY-­‐PRD-­‐4-­‐155

$150,000 $75,000 4 Park  Rehabilitation  and  Development  (COMM)

$550,000 COMM_Key

Montgomery Upper Dublin Township

Twining Valley Land Use Feasibility Study

BRC-TAG-19-146

$30,000.00 $30,000.00 19 Feasibility Studies (COMM)

$60,000.00 COMM_Key

Page 423: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  423  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Montgomery Upper Dublin Township

Twining Valley Land Use Feasibility Study

BRC-TAG-19-146

$30,000.00 $30,000.00 19 Feasibility Studies (COMM)

$60,000.00 COMM_Key

Montgomery Upper Dublin Township

Twining Valley Land Use Feasibility Study

BRC-TAG-19-146

$30,000.00 $30,000.00 19 Feasibility Studies (COMM)

$60,000.00 COMM_Key

Montgomery Upper Dublin Township

Twining Valley Land Use Feasibility Study

BRC-TAG-19-146

$30,000.00 $30,000.00 19 Feasibility Studies (COMM)

$60,000.00 COMM_Key

Montgomery Upper  Frederick  Township

Frederick  Friendship  Park

BRC-­‐SC-­‐10-­‐103

$40,000 $40,000 10 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Montgomery Upper  Frederick  Township

Township  Park KEY-­‐SC-­‐3-­‐223

$19,100 $19,100 3 Small  Communities/Small  Projects  (COMM)

$21,700 COMM_Key

Montgomery Upper  Gwynedd  Township

Nor-­‐Gwyn  Recreation  Complex-­‐Development

BRC-­‐PRD-­‐16-­‐163

$71,500 $71,500 16 Park  Rehabilitation  and  Development  (COMM)

$144,921 COMM_Key

Montgomery Upper  Hanover  Township

Berman  Tract  Park BRC-­‐SC-­‐8-­‐198

$25,100 $25,000 8 Small  Communities/Small  Projects  (COMM)

$30,200 COMM_Key

Montgomery Upper  Hanover  Township

Church  Road  Park BRC-­‐PRD-­‐13-­‐150

$163,400 $163,000 13 Park  Rehabilitation  and  Development  (COMM)

$326,900 COMM_Key

Page 424: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  424  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Montgomery Upper  Hanover  Township

Kistler  Bitting  YMCA  Park

KEY-­‐SC-­‐5-­‐206

$11,000 $11,000 5 Small  Communities/Small  Projects  (COMM)

$22,000 COMM_Key

Montgomery Upper  Merion  Township

Gulph  School  Park BRC-­‐PRD-­‐7-­‐197

$50,000 $50,000 7 Park  Rehabilitation  and  Development  (COMM)

$150,000 COMM_Key

Montgomery Upper  Merion  Township

Heuser  Park  Development

BRC-­‐PRD-­‐10-­‐35

$200,000 $100,000 10 Park  Rehabilitation  and  Development  (COMM)

$2,100,000 COMM_Key

Montgomery Upper Merion Township

Schuylkill River West Trail - Reaches 1 & 2 - Development

BRC-PRD-19-121

$106,598.00 $100,000.00 19 Park Rehabilitation and Development (COMM)

$1,406,656.00 COMM_Key

Montgomery Upper Merion Township

Schuylkill River West Trail - Reaches 1 & 2 - Development

BRC-PRD-19-121

$106,598.00 $100,000.00 19 Park Rehabilitation and Development (COMM)

$1,406,656.00 COMM_Key

Montgomery Upper Merion Township

Schuylkill River West Trail - Reaches 1 & 2 - Development

BRC-PRD-19-121

$106,598.00 $100,000.00 19 Park Rehabilitation and Development (COMM)

$1,406,656.00 COMM_Key

Montgomery Upper  Pottsgrove  Township

Heather  Place  Park BRC-­‐SC-­‐6-­‐184

$20,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Page 425: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  425  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Montgomery Upper Pottsgrove Township

Hilsee Land Acquisition

BRC-ACQ-19-16

$146,160.00 $146,100.00 19 Acquisition (COMM)

$292,320.00 COMM_Key

Montgomery Upper Pottsgrove Township

Hilsee Land Acquisition

BRC-ACQ-19-16

$146,160.00 $146,100.00 19 Acquisition (COMM)

$292,320.00 COMM_Key

Montgomery Upper Pottsgrove Township

Hilsee Land Acquisition

BRC-ACQ-19-16

$146,160.00 $146,100.00 19 Acquisition (COMM)

$292,320.00 COMM_Key

Montgomery Upper  Pottsgrove  Township

Mocharniuk  Property  Acquisition

BRC-­‐ACQ-­‐8-­‐202

$37,500 $37,000 8 Acquisition  (COMM)

$80,000 COMM_Key

Montgomery Upper  Providence  Township

Anderson  Farm  Park  -­‐  Phase  1B

BRC-­‐PRD-­‐14-­‐177

$250,000 $200,000 14 Park  Rehabilitation  and  Development  (COMM)

$1,748,700 COMM_Key

Montgomery Upper  Providence  Township

Anderson  Farm  Park-­‐ KEY-­‐PRD-­‐3-­‐225

$150,000 $100,000 3 Park  Rehabilitation  and  Development  (COMM)

$477,000 COMM_Key

Montgomery Upper  Providence  Township

Schuylkill  Canal  Restoration

BRC-­‐RCD-­‐8-­‐5

$100,000 $100,000 8 Development  (RIV)

$395,000 RIVER_Key

Montgomery Upper Salford Township

Rogers-Hiester Stewardship and Trail Plan

BRC-TAG-19-147

$20,000.00 $20,000.00 19 Conservation/Sound Land Use (COMM)

$40,000.00 COMM_Key

Montgomery Upper Salford Township

Rogers-Hiester Stewardship and Trail Plan

BRC-TAG-19-147

$20,000.00 $20,000.00 19 Conservation/Sound Land Use (COMM)

$40,000.00 COMM_Key

Montgomery Upper Salford Township

Rogers-Hiester Stewardship and Trail Plan

BRC-TAG-19-147

$20,000.00 $20,000.00 19 Conservation/Sound Land Use (COMM)

$40,000.00 COMM_Key

Page 426: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  426  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Montgomery Upper  Salford  Township

Upper  Salford  Twp.  Park  -­‐  Ph  II

KEY-­‐PRD-­‐3-­‐226

$67,400 $65,000 3 Park  Rehabilitation  and  Development  (COMM)

$134,800 COMM_Key

Montgomery Whitemarsh  Township

Municipal  Greenway  &  Open  Space  Network  Plan

BRC-­‐TAG-­‐11-­‐239

$27,500 $27,500 11 Greenway  Plans  (COMM)

$72,000 COMM_Key

Montgomery Whitemarsh  Township

WFIL    Property KEY-­‐ACQ-­‐4-­‐174

$100,000 $100,000 4 Acquisition  (COMM)

$1,236,100 COMM_Key

Montgomery Whitpain  Township Whitpain  Township  Trail  Network  Plan

BRC-­‐TAG-­‐14-­‐252

$24,300 $32,225 14 Trail  Study  (COMM)

$48,600 COMM_Key

Montgomery Wissahickon  Valley  Watershed  Association  

Armentrout  Tract KEY-­‐LTA-­‐4-­‐26

$240,000 $200,000 4 Open  Space  Acquisition  (LT)

$796,000 LT_Key

Montgomery Wissahickon Valley Watershed Association

Cedarbrook Conservation Easement

BRC-LTA-19-34

$45,918.00 $45,000.00 19 Open Space Acquisition (LT)

$93,546.00 LT_Key

Montgomery Wissahickon Valley Watershed Association

Cedarbrook Conservation Easement

BRC-LTA-19-34

$45,918.00 $45,000.00 19 Open Space Acquisition (LT)

$93,546.00 LT_Key

Montgomery Wissahickon Valley Watershed Association

Cedarbrook Conservation Easement

BRC-LTA-19-34

$45,918.00 $45,000.00 19 Open Space Acquisition (LT)

$93,546.00 LT_Key

Montgomery Wissahickon Valley Watershed Association

Cedarbrook Conservation Easement

BRC-LTA-19-34

$45,918.00 $45,000.00 19 Open Space Acquisition (LT)

$93,546.00 LT_Key

Montgomery Wissahickon  Valley  Watershed  Association  

Wissahickon  Green  Preserve

KEY-­‐LTA-­‐3-­‐25

$70,000 $50,000 3 Open  Space  Acquisition  (LT)

$140,000 LT_Key

Montgomery Worcester  Township Community  Greenway  Plan

BRC-­‐TAG-­‐6-­‐202

$17,500 $17,500 6 Greenway  Plans  (COMM)

$35,000 COMM_Key

Page 427: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  427  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Montgomery Worcester  Township Markel  Property BRC-­‐ACQ-­‐7-­‐213

$252,500 $250,000 7 Acquisition  (COMM)

$997,500 COMM_Key

Montgomery,  Northampton

Ambler  Borough Comp.  Rec.  &  Park  Plan

BRC-­‐TAG-­‐8-­‐16

$10,400 $10,000 8 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$20,900 COMM_Key

Montgomery,  Philadelphia

Lower  Merion  Township

Manayunk  Bridge  Multi-­‐Use  Trail  Connector  -­‐  Development

BRC-­‐PRD-­‐18-­‐84

$500,000 $500,000 18 Park  Rehabilitation  and  Development  (COMM)

$2,700,000 COMM_Key

Montgomery,  Philadelphia

Philadelphia  Water  Department  

Pennypack  River  Conservation  Plan

BRC-­‐RCP-­‐8-­‐1

$100,000 $100,000 8 Planning  (RIV) $235,200 RIVER_Key

Montour Danville  Borough Tennis  Courts KEY-­‐PRD-­‐4-­‐41

$27,000 $27,000 4 Park  Rehabilitation  and  Development  (COMM)

$62,000 COMM_Key

Montour Montour  Area  Recreation  Commission  

Danville  Area  Riverfront  and  Open  Space  Master  Plan

BRC-­‐TAG-­‐13.6-­‐598

$25,000 $25,000 13.6 Master  Site  Plans  (COMM)

$50,000 COMM_Key

Montour Montour  Area  Recreation  Commission  

Hess  Field  /Robbins  Trail  Park

BRC-­‐PRD-­‐13.3-­‐400

$61,400 $61,400 13.3 Park  Rehabilitation  and  Development  (COMM)

$122,900 COMM_Key

Montour Montour  County Circuit  Rider BRC-­‐TAG-­‐11-­‐252

$53,300 $72,228 11 Circuit  Rider  (COMM)

$91,800 COMM_Key

Page 428: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  428  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Montour Montour  County Comp.Recreation  Park  &  Open  Space  Plan

KEY-­‐TAG-­‐5-­‐136

$15,000 $15,000 5 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$30,000 COMM_Key

Montour Montour  County J.  Manley  Robbins  Trail

BRC-­‐RTD-­‐8-­‐21

$98,000 $23,000 8 Rail  Rehabilitation  and  Development  (RT)

$548,900 RT_Key

Montour Montour  County Montour  Preserve  Envir.    Ed.  Center

KEY-­‐PRD-­‐3-­‐145

$200,000 $50,000 3 Park  Rehabilitation  and  Development  (COMM)

$480,000 COMM_Key

Montour Washingtonville  Borough

Frank  E.  DeLong  Memorial  Park  Rehabilitation

BRC-­‐SC-­‐12-­‐127

$40,000 $40,000 12 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Multiple Alliance  for  the  Chesapeake  Bay,  Inc.  

Susquehanna  River  Water  Trail

BRC-­‐RCI-­‐7-­‐3 $30,750 $30,000 7 Implementation  (RIV)

$62,945 RIVER_Key

Multiple American  Littoral  Society  

Schuylkill  Watershed  Congress

BRC-­‐RCI-­‐9-­‐1 $34,000 $20,000 9 Implementation  (RIV)

$82,000 RIVER_Key

Multiple Beaver/Butler  Councils  of  Governments  

Fifteen  Sites KEY-­‐PRD-­‐2-­‐8

$177,262 $160,100 2 Park  Rehabilitation  and  Development  (COMM)

$354,524 COMM_Key

Page 429: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  429  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Multiple Cambria  Somerset  Authority  

Comprehensive  Land  Management  Plan

BRC-­‐TAG-­‐7-­‐33

$38,250 $38,000 7 Master  Site  Plans  (COMM)

$76,500 COMM_Key

Multiple Cambria  Somerset  Authority  

Wilmore  Reservoir  Recreation  Area

BRC-­‐PRD-­‐9-­‐42

$118,300 $118,000 9 Park  Rehabilitation  and  Development  (COMM)

$237,400 COMM_Key

Multiple Eastern  Pennsylvania  Coalition  for  Abandoned  Mine  Reclamation  

Bowman's  Creek KEY-­‐CHP-­‐2-­‐2

$5,000 $5,000 5 Coldwater  Heritage  Partnership

$5,000 RIVER_Key

Multiple Endless  Mountains  Resource  Conservation  Trust  

Pine  Creek  Watershed  Conservation  Plan

BRC-­‐RCP-­‐8-­‐12

$157,000 $152,000 8 Planning  (RIV) $314,000 RIVER_Key

Multiple Hawk  Mountain  Sanctuary  Association  

Master  and  Strategic  Plan

KEY-­‐LTP-­‐4-­‐7 $40,000 $42,000 4 Critical  Habitat  Planning  (LT)

$92,300 LT_Key

Multiple Headwaters  Charitable  Trust  

Feasibility  Study KEY-­‐RTP-­‐95-­‐14

$15,000 $15,000 1 Feasibility  Studies  (RT)

$30,000 RT_Key

Multiple Headwaters  R.  C.  &  D.  Council  

Clarion  River  Conservation  Plan

KEY-­‐RCP-­‐95-­‐02

$50,000 $50,000 1 Planning  (RIV) $115,800 RIVER_Key

Multiple Heritage  Conservancy  

Middle  Delaware  River  Plan

BRC-­‐RCP-­‐6-­‐2

$42,190 $42,000 6 Planning  (RIV) $93,990 RIVER_Key

Multiple Heritage  Conservancy  

N.E.  Pa.  Conservation  Plan

KEY-­‐LTP-­‐1-­‐4 $20,000 $20,000 1 Open  Space  Planning  (LT)

$40,000 LT_Key

Page 430: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  430  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Multiple Heritage  Conservancy  

Schuylkill  Riparian  Buffer  Assessment/Restoration

BRC-­‐RCI-­‐11-­‐8

$21,200 $20,000 11 Implementation  (RIV)

$106,900 RIVER_Key

Multiple Juniata  Clean  Water  Partnership  

Mainline  Canal  Greenway  Education  &  Outreach

BRC-­‐RCP-­‐13.3-­‐476

$60,100 $50,000 13.3 Education  and  Training  (COMM)

$120,800 RIVER_Key

Multiple Lehigh  County  Conservation  District  

Saucon  Creek  Watershed  Rivers  Conservation  Plan

BRC-­‐RCP-­‐12.5-­‐1

$50,000 $50,000 12.5 Planning  (RIV) $106,100 COMM_Key

Multiple Mountain  Watershed  Association,  Inc.  

Indian  Creek  Watershed  Plan

KEY-­‐RCP-­‐5-­‐16

$50,000 $50,000 5 Planning  (RIV) $118,700 RIVER_Key

Multiple National  Audubon  Society,  Inc.  

Important  Bird  Area  Conservation  Planning

KEY-­‐LTP-­‐5-­‐8 $182,100 $220,000 5 Open  Space  Planning  (LT)

$440,000 LT_Key

Multiple National Audubon Society, Inc.

Kittatinny Ridge and Applachian Trail Conservation 2014

BRC-SR-19-174

$184,516.00 $160,000.00 19 Partnerships Projects

$369,032.00 LT_Key

Multiple Natural  Lands  Trust,  Inc.  

PA  Piedmont  "Big  Woods"  Conservation  Plan

KEY-­‐LTP-­‐5-­‐10

$50,000 $25,000 5 Open  Space  Planning  (LT)

$100,000 LT_Key

Multiple North  Central  Pennsylvania  Regional  Planning  and  Development  Commission  

North  Central  PA  Greenways  Implementation  Program

BRC-­‐SR-­‐17-­‐201

$150,000 $150,000 17 Partnerships  Projects

$300,000 COMM_Key

Multiple Northampton  County

Circuit  Rider-­‐D  &  L  Trail  Planner

BRC-­‐TAG-­‐7-­‐3

$40,000 $101,000 7 Circuit  Rider  (COMM)

$330,000 COMM_Key

Page 431: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  431  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Multiple Northcentral  Pennsylvania  Conservancy  

Lower  W.  Br.  Susquehanna  River  Corridor  Plan

BRC-­‐RCP-­‐6-­‐16

$266,200 $266,000 6 Planning  (RIV) $532,400 RIVER_Key

Multiple Octoraro  Watershed  Association  

Octoraro  Watershed  Conservation  Plan

KEY-­‐RCP-­‐96-­‐11

$20,000 $20,000 3 Planning  (RIV) $40,000 RIVER_Key

Multiple Pennsylvania  Environmental  Council,  Inc.  

Allegheny  River  Corridor  Plan

BRC-­‐RCP-­‐9-­‐14

$130,000 $110,000 9 Planning  (RIV) $260,000 RIVER_Key

Multiple Pennsylvania  Environmental  Council,  Inc.  

Bowman  Creek  Watershed  Plan

BRC-­‐RCP-­‐6-­‐14

$35,800 $36,000 6 Planning  (RIV) $71,600 RIVER_Key

Multiple Pennsylvania  Environmental  Council,  Inc.  

North  Branch  Susquehanna  River  Corridor  Plan

KEY-­‐RCP-­‐5-­‐13

$95,000 $95,000 5 Planning  (RIV) $289,200 RIVER_Key

Multiple Pennsylvania  Environmental  Council,  Inc.  

Tunkhannock  Creek  Watershed  Plan

KEY-­‐RCP-­‐95-­‐21

$50,000 $50,000 1 Planning  (RIV) $116,900 RIVER_Key

Multiple Perkiomen  Watershed  Conservancy  

Lower  Perkiomen  Creek  Watershed  Plan

BRC-­‐RCP-­‐6-­‐10

$80,000 $80,000 6 Planning  (RIV) $160,000 RIVER_Key

Multiple Regional  Trail  Corporation  

"Trail  Towns"  Initiative

BRC-­‐RTP-­‐8-­‐13

$50,000 $50,000 8 Feasibility  Studies  (RT)

$100,000 RT_Key

Multiple Regional  Trail  Corporation  

Youghiogheny  River  Conservation  Plan

KEY-­‐RCP-­‐95-­‐10

$50,000 $50,000 1 Planning  (RIV) $100,000 RIVER_Key

Page 432: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  432  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Multiple Regional  Trail  Corporation  

Youghiogheny  River  Trail  (North  Section)

KEY-­‐RTD-­‐3-­‐18

$50,000 $50,000 3 Rail  Rehabilitation  and  Development  (RT)

$870,000 RT_Key

Multiple Schuylkill  River  Greenway  Association  

Schuylkill  River  Trails  Comp.  Sign  System  Plan

BRC-­‐RCI-­‐9-­‐16

$21,500 $20,000 9 Implementation  (RIV)

$43,000 RIVER_Key

Multiple SEDA-­‐Council  of  Governments  

Conduit  Grant BRC-­‐PRD-­‐7-­‐171

$292,000 $300,000 7 Park  Rehabilitation  and  Development  (COMM)

$401,750 COMM_Key

Multiple SEDA-Council of Governments

Susquehanna Greenway Implementation and Technical Assistance 2014

BRC-SR-19-193

$322,898.00 $270,000.00 19 Partnerships Projects

$736,340.00 COMM_Key

Multiple SEDA-Council of Governments

Susquehanna Greenway Implementation and Technical Assistance 2014

BRC-SR-19-193

$322,898.00 $270,000.00 19 Partnerships Projects

$736,340.00 COMM_Key

Multiple SEDA-Council of Governments

Susquehanna Greenway Implementation and Technical Assistance 2014

BRC-SR-19-193

$322,898.00 $270,000.00 19 Partnerships Projects

$736,340.00 COMM_Key

Multiple SEDA-Council of Governments

Susquehanna Greenway Implementation and Technical Assistance 2014

BRC-SR-19-193

$322,898.00 $270,000.00 19 Partnerships Projects

$736,340.00 COMM_Key

Page 433: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  433  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Multiple SEDA-Council of Governments

Susquehanna Greenway Implementation and Technical Assistance 2014

BRC-SR-19-193

$322,898.00 $270,000.00 19 Partnerships Projects

$736,340.00 COMM_Key

Multiple SEDA-Council of Governments

Susquehanna Greenway Implementation and Technical Assistance 2014

BRC-SR-19-193

$322,898.00 $270,000.00 19 Partnerships Projects

$736,340.00 COMM_Key

Multiple SEDA-Council of Governments

Susquehanna Greenway Implementation and Technical Assistance 2014

BRC-SR-19-193

$322,898.00 $270,000.00 19 Partnerships Projects

$736,340.00 COMM_Key

Multiple SEDA-Council of Governments

Susquehanna Greenway Implementation and Technical Assistance 2014

BRC-SR-19-193

$322,898.00 $270,000.00 19 Partnerships Projects

$736,340.00 COMM_Key

Multiple SEDA-Council of Governments

Susquehanna Greenway Implementation and Technical Assistance 2014

BRC-SR-19-193

$322,898.00 $270,000.00 19 Partnerships Projects

$736,340.00 COMM_Key

Multiple SEDA-Council of Governments

Susquehanna Greenway Implementation and Technical Assistance 2014

BRC-SR-19-193

$322,898.00 $270,000.00 19 Partnerships Projects

$736,340.00 COMM_Key

Multiple SEDA-Council of Governments

Susquehanna Greenway Implementation and Technical Assistance 2014

BRC-SR-19-193

$322,898.00 $270,000.00 19 Partnerships Projects

$736,340.00 COMM_Key

Page 434: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  434  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Multiple SEDA-Council of Governments

Susquehanna Greenway Implementation and Technical Assistance 2014

BRC-SR-19-193

$322,898.00 $270,000.00 19 Partnerships Projects

$736,340.00 COMM_Key

Multiple SEDA-Council of Governments

Susquehanna Greenway Implementation and Technical Assistance 2014

BRC-SR-19-193

$322,898.00 $270,000.00 19 Partnerships Projects

$736,340.00 COMM_Key

Multiple SEDA-Council of Governments

Susquehanna Greenway Implementation and Technical Assistance 2014

BRC-SR-19-193

$322,898.00 $270,000.00 19 Partnerships Projects

$736,340.00 COMM_Key

Multiple SEDA-Council of Governments

Susquehanna Greenway Implementation and Technical Assistance 2014

BRC-SR-19-193

$322,898.00 $270,000.00 19 Partnerships Projects

$736,340.00 COMM_Key

Multiple SEDA-Council of Governments

Susquehanna Greenway Implementation and Technical Assistance 2014

BRC-SR-19-193

$322,898.00 $270,000.00 19 Partnerships Projects

$736,340.00 COMM_Key

Multiple SEDA-Council of Governments

Susquehanna Greenway Implementation and Technical Assistance 2014

BRC-SR-19-193

$322,898.00 $270,000.00 19 Partnerships Projects

$736,340.00 COMM_Key

Multiple SEDA-Council of Governments

Susquehanna Greenway Implementation and Technical Assistance 2014

BRC-SR-19-193

$322,898.00 $270,000.00 19 Partnerships Projects

$736,340.00 COMM_Key

Page 435: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  435  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Multiple SEDA-Council of Governments

Susquehanna Greenway Implementation and Technical Assistance 2014

BRC-SR-19-193

$322,898.00 $270,000.00 19 Partnerships Projects

$736,340.00 COMM_Key

Multiple Shippensburg  Area  Recreation  &  Park  Commission  

Circuit  Rider  Director  of  Recreation  &  Parks

BRC-­‐TAG-­‐12-­‐54

$6,250 $6,250 12 Circuit  Rider  (COMM)

$25,000 COMM_Key

Multiple Southern  Alleghenies  Conservancy  

Manufacturers  Water  Co.Tracts

KEY-­‐LTA-­‐5-­‐16

$1,500,000 $750,000 5 Open  Space  Acquisition  (LT)

$4,850,000 LT_Key

Multiple Steel  Industry  Heritage  Corporation  

Monongahela  River  Conservation  Plan

KEY-­‐RCP-­‐95-­‐15

$50,000 $50,000 1 Planning  (RIV) $100,000 RIVER_Key

Multiple Stream  Restoration,  Inc.  

Slippery  Rock  Creek  Watershed  RCP

BRC-­‐RCP-­‐12.5-­‐22

$94,100 $94,000 12.5 Planning  (RIV) $188,200 RIVER_Key

Multiple The  Conservation  Fund  

Schuylkill  River  Watershed  Conservation  Plan

KEY-­‐RCP-­‐96-­‐07

$225,000 $225,000 3 Planning  (RIV) $450,000 RIVER_Key

Multiple The  Nature  Conservancy  

Serpentine  Barrens  Conservation  Plan

KEY-­‐LTP-­‐1-­‐14

$50,000 $50,000 1 Critical  Habitat  Planning  (LT)

$100,000 LT_Key

Multiple Western  Pennsylvania  Conservancy  

Clarion  River  Corridor

KEY-­‐LTA-­‐3-­‐21

$871,225 $550,000 3 Open  Space  Acquisition  (LT)

$1,100,000 LT_Key

Multiple Western  Pennsylvania  Conservancy  

Clarion  River  Corridor

KEY-­‐LTA-­‐4-­‐22

$800,000 $500,000 4 Open  Space  Acquisition  (LT)

$1,600,000 LT_Key

Multiple Western  Pennsylvania  Conservancy  

French  Creek  Watershed  Plan

KEY-­‐RCP-­‐5-­‐18

$150,000 $100,000 5 Planning  (RIV) $300,000 RIVER_Key

Page 436: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  436  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Multiple Western  Pennsylvania  Conservancy  

Mahoning  Creek  Regional  Watershed  Conservation  Plan

BRC-­‐RCP-­‐13.3-­‐514

$50,000 $50,000 13.3 Planning  (RIV) $100,000 RIVER_Key

Multiple Western  Pennsylvania  Conservancy  

Shenango  River  Watershed  Conservation  Plan

BRC-­‐RCP-­‐8-­‐25

$145,000 $145,000 8 Planning  (RIV) $307,000 RIVER_Key

Multiple Western  Pennsylvania  Conservancy  

Sinnemahoning  Creek  Watershed    Conservation  Plan

BRC-­‐RCP-­‐12-­‐17

$150,000 $150,000 12 Planning  (RIV) $342,900 RIVER_Key

Multiple Wildlands  Conservancy,  Inc.  

Bog  Turtle  Habitat  Inventory  and  Management  Plan

KEY-­‐LTP-­‐5-­‐23

$16,703 $16,000 5 Critical  Habitat  Planning  (LT)

$33,400 LT_Key

Multiple Wildlands  Conservancy,  Inc.  

Lehigh  River  Watershed  Plan

KEY-­‐RCP-­‐5-­‐7

$350,000 $150,000 5 Planning  (RIV) $715,733 RIVER_Key

Multiple Wildlands  Conservancy,  Inc.  

Nesquehoning  Cr.  Acid  Mine  Drainage  Treatment

BRC-­‐RCD-­‐9-­‐18

$80,000 $80,000 9 Development  (RIV)

$210,000 RIVER_Key

Northampton Allen  Township Lower  Property  Acquisition

BRC-­‐ACQ-­‐12.5-­‐11

$115,000 $115,000 12.5 Acquisition  (COMM)

$230,000 COMM_Key

Northampton Bangor  Borough Two  Sites BRC-­‐PRD-­‐13-­‐335

$126,200 $126,000 13 Park  Rehabilitation  and  Development  (COMM)

$252,400 COMM_Key

Northampton Bath  Borough Monocacy  Creek  Park

BRC-­‐ACQ-­‐7-­‐16

$24,500 $31,000 7 Acquisition  (COMM)

$49,000 COMM_Key

Page 437: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  437  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Northampton Bath  Borough Monocacy  Creek  Park

BRC-­‐PRD-­‐7-­‐17

$62,235 $62,000 7 Park  Rehabilitation  and  Development  (COMM)

$124,470 COMM_Key

Northampton Bethlehem  City Bethlehem  Skateplaza  -­‐  Phase  2  -­‐  Development

BRC-­‐PRD-­‐16-­‐122

$250,000 $185,000 16 Park  Rehabilitation  and  Development  (COMM)

$673,000 COMM_Key

Northampton Bethlehem  City Higbee  Park-­‐  Development

BRC-­‐PRD-­‐16-­‐1

$75,000 $75,000 16 Park  Rehabilitation  and  Development  (COMM)

$159,683 COMM_Key

Northampton Bethlehem  City Ice  House KEY-­‐PRD-­‐1-­‐11

$250,000 $150,000 1 Park  Rehabilitation  and  Development  (COMM)

$512,349 COMM_Key

Northampton Bethlehem  City Johnston  Park  Development

BRC-­‐RCD-­‐17-­‐167

$70,000 $58,800 17 Development  (RIV)

$140,000 RIVER_Key

Northampton Bethlehem  City Monocacy  Way  Pathway

KEY-­‐PRD-­‐3-­‐20

$45,000 $45,000 3 Park  Rehabilitation  and  Development  (COMM)

$90,000 COMM_Key

Page 438: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  438  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Northampton Bethlehem  City Sand  Island BRC-­‐PRD-­‐11-­‐260

$200,000 $200,000 11 Park  Rehabilitation  and  Development  (COMM)

$850,000 COMM_Key

Northampton Bethlehem  City Skate  Park-­‐Phase  I BRC-­‐PRD-­‐13-­‐90

$430,000 $400,000 13 Park  Rehabilitation  and  Development  (COMM)

$860,000 COMM_Key

Northampton Bethlehem  City South  Bethlehem  Greenway  -­‐  East  6th  Street  to  Saucon  Park  Dev.

BRC-­‐PRD-­‐17-­‐106

$200,000 $200,000 17 Park  Rehabilitation  and  Development  (COMM)

$400,000 COMM_Key

Northampton Bethlehem  City South  Bethlehem  Greenway  -­‐  Phase  II  &  III

BRC-­‐PRD-­‐14-­‐114

$400,000 $600,000 14 Park  Rehabilitation  and  Development  (COMM)

$800,000 COMM_Key

Northampton Bethlehem City South Bethlehem Greenway – Connection to Saucon Park Ballfields – Development

BRC-PRD-19-58

$500,000.00 $500,000.00 19 Park Rehabilitation and Development (COMM)

$1,007,530.00 COMM_Key

Northampton Bethlehem City South Bethlehem Greenway – Connection to Saucon Park Ballfields – Development

BRC-PRD-19-58

$500,000.00 $500,000.00 19 Park Rehabilitation and Development (COMM)

$1,007,530.00 COMM_Key

Page 439: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  439  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Northampton Bethlehem City South Bethlehem Greenway – Connection to Saucon Park Ballfields – Development

BRC-PRD-19-58

$500,000.00 $500,000.00 19 Park Rehabilitation and Development (COMM)

$1,007,530.00 COMM_Key

Northampton Bethlehem  City South  Bethlehem  Greenway-­‐  Phase  I

BRC-­‐PRD-­‐13.3-­‐551

$400,000 $450,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$1,600,000 COMM_Key

Northampton Bethlehem  City South  Bethlehem  Railway

BRC-­‐RTA-­‐10-­‐5

$600,000 $500,000 10 Acquisition  (RT) $1,200,000 COMM_Key

Northampton Bethlehem Township Janet Johnston Housenick/William D. Housenick Memorial Park

BRC-PRD-19-59

$203,986.00 $203,000.00 19 Park Rehabilitation and Development (COMM)

$444,934.00 COMM_Key

Northampton Bethlehem Township Janet Johnston Housenick/William D. Housenick Memorial Park

BRC-PRD-19-59

$203,986.00 $203,000.00 19 Park Rehabilitation and Development (COMM)

$444,934.00 COMM_Key

Northampton Bethlehem Township Janet Johnston Housenick/William D. Housenick Memorial Park

BRC-PRD-19-59

$203,986.00 $203,000.00 19 Park Rehabilitation and Development (COMM)

$444,934.00 COMM_Key

Northampton Bethlehem Township Janet Johnston Housenick/William D. Housenick Memorial Park

BRC-PRD-19-59

$203,986.00 $203,000.00 19 Park Rehabilitation and Development (COMM)

$444,934.00 COMM_Key

Page 440: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  440  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Northampton Bethlehem Township Janet Johnston Housenick/William D. Housenick Memorial Park

BRC-PRD-19-59

$203,986.00 $203,000.00 19 Park Rehabilitation and Development (COMM)

$444,934.00 COMM_Key

Northampton Bethlehem  Township

Master  Site  Development  Plan

KEY-­‐TAG-­‐2-­‐12

$15,000 $15,000 2 Master  Site  Plans  (COMM)

$30,000 COMM_Key

Northampton Bethlehem  Township

North  Side  Athletic  Complex  -­‐  Phase  II

KEY-­‐PRD-­‐4-­‐15

$117,900 $100,000 4 Park  Rehabilitation  and  Development  (COMM)

$235,800 COMM_Key

Northampton Bushkill Township Bushkill Township Recreation Complex– Development

BRC-PRD-19-62

$74,646.94 $74,600.00 19 Park Rehabilitation and Development (COMM)

$149,293.88 COMM_Key

Northampton Bushkill Township Bushkill Township Recreation Complex– Development

BRC-PRD-19-62

$74,646.94 $74,600.00 19 Park Rehabilitation and Development (COMM)

$149,293.88 COMM_Key

Northampton Bushkill Township Bushkill Township Recreation Complex– Development

BRC-PRD-19-62

$74,646.94 $74,600.00 19 Park Rehabilitation and Development (COMM)

$149,293.88 COMM_Key

Northampton Bushkill  Township MAB  Family  Partnership  Property  Acquisition

BRC-­‐ACQ-­‐18-­‐4

$656,500 $656,500 18 Acquisition  (COMM)

$1,313,000 COMM_Key

Page 441: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  441  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Northampton Bushkill  Township PPL  Trail BRC-­‐PRD-­‐13.6-­‐567

$200,000 $200,000 13.6 Park  Rehabilitation  and  Development  (COMM)

$400,000 COMM_Key

Northampton Bushkill  Township Recreation  Area  Master  Site  Plan

BRC-­‐TAG-­‐16-­‐54

$24,000 $24,000 16 Master  Site  Plans  (COMM)

$48,000 COMM_Key

Northampton Bushkill  Township Township  Park  Master  Site  Plan

BRC-­‐TAG-­‐18-­‐144

$19,250 $19,200 18 Master  Site  Plans  (COMM)

$38,503 COMM_Key

Northampton Chapman  Borough Borough  Park BRC-­‐SC-­‐6-­‐35

$20,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$25,000 COMM_Key

Northampton East  Allen  Township Jacksonville  Park  MSP  &  Greenway  FS

BRC-­‐TAG-­‐12.5-­‐28

$10,000 $10,000 12.5 Master  Site  Plans  (COMM)

$20,000 COMM_Key

Northampton East  Allen  Township Sunny  Slope  Farm  Acquisition

BRC-­‐ACQ-­‐17-­‐92

$86,000 $84,500 17 Acquisition  (COMM)

$174,000 COMM_Key

Northampton Easton  City 2  Pool  Feasibility  Study

BRC-­‐TAG-­‐13.3-­‐468

$15,000 $15,000 13.3 Feasibility  Studies  (COMM)

$30,000 COMM_Key

Northampton Easton City Bushkill Drive Path to KSAT – Development

BRC-PRD-19-77

$120,000.00 $75,000.00 19 Park Rehabilitation and Development (COMM)

$150,000.00 COMM_Key

Northampton Easton City Bushkill Drive Path to KSAT – Development

BRC-PRD-19-77

$120,000.00 $75,000.00 19 Park Rehabilitation and Development (COMM)

$150,000.00 COMM_Key

Page 442: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  442  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Northampton Easton City Bushkill Drive Path to KSAT – Development

BRC-PRD-19-77

$120,000.00 $75,000.00 19 Park Rehabilitation and Development (COMM)

$150,000.00 COMM_Key

Northampton Easton  City Comp.  Parks,  Recreation  &  Open  Space  Plan

BRC-­‐TAG-­‐10-­‐151

$20,000 $20,000 10 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$45,000 COMM_Key

Northampton Easton  City Eddyside  Pool BRC-­‐PRD-­‐6-­‐57

$82,500 $82,000 6 Park  Rehabilitation  and  Development  (COMM)

$165,000 COMM_Key

Northampton Easton  City Heil  Park  -­‐  Development

BRC-­‐PRD-­‐16-­‐130

$213,200 $213,000 16 Park  Rehabilitation  and  Development  (COMM)

$426,400 COMM_Key

Northampton Easton  City Heil  Pool BRC-­‐PRD-­‐14-­‐131

$300,000 $300,000 14 Park  Rehabilitation  and  Development  (COMM)

$600,000 COMM_Key

Northampton Easton  City Hugh  Moore  Park-­‐  Development

BRC-­‐PRD-­‐18-­‐67

$325,000 $175,000 18 Park  Rehabilitation  and  Development  (COMM)

$675,000 COMM_Key

Page 443: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  443  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Northampton Easton  City Milton  Street,  Eddyside,  Heil  Parks

BRC-­‐PRD-­‐13.3-­‐355

$75,000 $75,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$150,000 COMM_Key

Northampton Hanover  Township Two  Sites KEY-­‐PRD-­‐5-­‐80

$77,600 $77,600 5 Park  Rehabilitation  and  Development  (COMM)

$155,200 COMM_Key

Northampton Hellertown  Borough Dimmick  Park  -­‐  MSP BRC-­‐TAG-­‐13-­‐185

$14,800 $14,800 13 Master  Site  Plans  (COMM)

$29,600 COMM_Key

Northampton Hellertown  Borough Recreation  Peer-­‐to-­‐Peer

BRC-­‐TAG-­‐16-­‐243

$10,000 $10,000 16 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$11,000 COMM_Key

Northampton Hellertown Borough Water Street Park – Development

BRC-PRD-19-83

$124,344.00 $124,000.00 19 Park Rehabilitation and Development (COMM)

$248,688.00 COMM_Key

Northampton Hellertown Borough Water Street Park – Development

BRC-PRD-19-83

$124,344.00 $124,000.00 19 Park Rehabilitation and Development (COMM)

$248,688.00 COMM_Key

Northampton Hellertown Borough Water Street Park – Development

BRC-PRD-19-83

$124,344.00 $124,000.00 19 Park Rehabilitation and Development (COMM)

$248,688.00 COMM_Key

Page 444: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  444  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Northampton Heritage  Conservancy  

Smejkal  Easement BRC-­‐LTA-­‐13.3-­‐516

$59,800 $59,800 13.3 Open  Space  Acquisition  (LT)

$119,600 LT_Key

Northampton Heritage  Conservancy  

Wentzell  Conservation  Easement

BRC-­‐LTA-­‐12.5-­‐6

$53,000 $53,000 12.5 Open  Space  Acquisition  (LT)

$106,000 LT_Key

Northampton Lower  Saucon  Township

Dravecz  Acquisition  and  Easements

BRC-­‐ACQ-­‐14-­‐61

$244,500 $244,000 14 Acquisition  (COMM)

$489,000 COMM_Key

Northampton Lower  Saucon  Township

Kingston,  Polk  Valley  and  Steel  City  Parks-­‐Development

BRC-­‐PRD-­‐17-­‐135

$99,595 $90,000 17 Park  Rehabilitation  and  Development  (COMM)

$199,189 COMM_Key

Northampton Lower  Saucon  Township

Polk  Valley  Park BRC-­‐PRD-­‐13.3-­‐388

$27,800 $20,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$70,800 COMM_Key

Northampton Lower  Saucon  Township

Rail  Trail  Trailhead  Access  -­‐  Acquisition

BRC-­‐ACQ-­‐17-­‐95

$29,725 $29,700 17 Acquisition  (COMM)

$59,450 COMM_Key

Northampton Lower  Saucon  Township

Town  Hall  Park BRC-­‐PRD-­‐6-­‐99

$22,000 $22,000 6 Park  Rehabilitation  and  Development  (COMM)

$44,000 COMM_Key

Northampton Martins  Jacoby  Watershed  Association  

Watershed  Conservation  Plan  for  Northeastern  Northampton  Co.

BRC-­‐RCP-­‐12-­‐9

$12,500 $12,500 12 Planning  (RIV) $25,000 RIVER_Key

Page 445: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  445  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Northampton Natural  Lands  Trust,  Inc.  

McBrien  Conservation  Easement

BRC-­‐LTA-­‐12.5-­‐12

$157,500 $150,000 12.5 Open  Space  Acquisition  (LT)

$347,700 LT_Key

Northampton Nazareth  Area  Council  of  Governments  

Multi-­‐Municipal  Rec.  &  Park  Plan

BRC-­‐TAG-­‐9-­‐146

$31,200 $31,000 9 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$62,500 COMM_Key

Northampton North  Catasauqua  Borough

Arch  Street  Playground

KEY-­‐SC-­‐1-­‐97 $20,000 $20,000 1 Small  Communities/Small  Projects  (COMM)

$22,112 COMM_Key

Northampton Northampton  Borough

D&L  Trail  Development  –  Northampton  Borough  –  Development

BRC-­‐TAG-­‐17-­‐17

$160,000 $160,000 17 Trail  Study  (COMM)

$648,750 COMM_Key

Northampton Northampton  Borough

Lehigh  Canal  Heritage  Trail  and  Bridge

BRC-­‐PRD-­‐8-­‐139

$50,000 $50,000 8 Park  Rehabilitation  and  Development  (COMM)

$264,000 COMM_Key

Northampton Northampton  County

Master  Site  Development  Plan

KEY-­‐TAG-­‐1-­‐101

$39,600 $20,000 1 Master  Site  Plans  (COMM)

$99,000 COMM_Key

Northampton Northampton  County

Nor-­‐Bath  Trail  -­‐  Phase  III  Improvements

KEY-­‐RTD-­‐3-­‐15

$60,000 $60,000 3 Rail  Rehabilitation  and  Development  (RT)

$120,000 RT_Key

Page 446: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  446  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Northampton Northampton  County

Nor-­‐Bath  Trail  -­‐  Phase  IV

BRC-­‐PRD-­‐6-­‐129

$100,000 $100,000 6 Park  Rehabilitation  and  Development  (COMM)

$400,000 COMM_Key

Northampton Northampton  County

Nor-­‐Bath  Trail-­‐  Phase  II

KEY-­‐RTD-­‐95-­‐21

$40,000 $40,000 1 Rail  Rehabilitation  and  Development  (RT)

$100,000 RT_Key

Northampton Northampton  County

Totts  Gap  Acquisition

BRC-­‐ACQ-­‐11-­‐184

$670,700 $625,000 11 Acquisition  (COMM)

$1,589,100 COMM_Key

Northampton Northampton  County

Wayne  A.  Grube  Memorial  Park  -­‐  Development

BRC-­‐PRD-­‐13.3-­‐407

$545,000 $150,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$2,179,300 COMM_Key

Northampton Palmer  Township Intermunicipal  Bikeway/Walkway

KEY-­‐RTD-­‐95-­‐23

$71,000 $71,000 1 Rail  Rehabilitation  and  Development  (RT)

$142,000 RT_Key

Northampton Palmer  Township Palmer  Township  Bike  Path

BRC-­‐PRD-­‐14-­‐160

$200,000 $200,000 14 Park  Rehabilitation  and  Development  (COMM)

$400,000 COMM_Key

Page 447: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  447  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Northampton Palmer  Township Recreational  Trail BRC-­‐RTD-­‐9-­‐9

$189,500 $150,000 9 Rail  Rehabilitation  and  Development  (RT)

$379,000 RT_Key

Northampton Pen  Argyl  Borough Weona  Park BRC-­‐SC-­‐6-­‐137

$20,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$23,700 COMM_Key

Northampton Pen  Argyl  Borough Weona  Park BRC-­‐SC-­‐7-­‐150

$30,381 $30,000 7 Small  Communities/Small  Projects  (COMM)

$40,762 COMM_Key

Northampton Pen  Argyl  Borough Weona  Park  Expansion  -­‐  Land  Acquisition

BRC-­‐ACQ-­‐13.3-­‐282

$300,000 $300,000 13.3 Acquisition  (COMM)

$1,350,000 COMM_Key

Northampton Pen  Argyl  Borough Weona  Park  Master  Site  Plan

BRC-­‐TAG-­‐6-­‐138

$19,500 $19,500 6 Master  Site  Plans  (COMM)

$39,000 COMM_Key

Northampton Plainfield  Township Community  Park BRC-­‐PRD-­‐13-­‐135

$199,800 $200,000 13 Park  Rehabilitation  and  Development  (COMM)

$399,600 COMM_Key

Northampton Roseto  Borough Borough  Park-­‐Phase  I

KEY-­‐SC-­‐2-­‐132

$19,770 $19,700 2 Small  Communities/Small  Projects  (COMM)

$19,770 COMM_Key

Northampton Roseto  Borough Roseto  Municipal  Park

BRC-­‐SC-­‐7-­‐167

$40,000 $40,000 7 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Page 448: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  448  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Northampton Stockertown  Borough

Stockertown  Recreation  Trail

BRC-­‐PRD-­‐16-­‐212

$100,000 $100,000 16 Park  Rehabilitation  and  Development  (COMM)

$250,436 COMM_Key

Northampton Tatamy  Borough Tatamy  Borough  Trail

BRC-­‐RTD-­‐8-­‐16

$106,400 $106,000 8 Rail  Rehabilitation  and  Development  (RT)

$212,700 RT_Key

Northampton The  Nature  Conservancy  

Broad  Acquisition  (Minsi  Corridor/Kittatinny  Ridge)

BRC-­‐LTA-­‐17-­‐59

$81,200 $77,900 17 Open  Space  Acquisition  (LT)

$162,400 LT_Key

Northampton The  Nature  Conservancy  

Garofalo  Acquisition BRC-­‐LTA-­‐14-­‐44

$47,200 $47,200 14 Critical  Habitat  Acquisition  (LT)

$94,400 LT_Key

Northampton The  Nature  Conservancy  

Janette/Comunale  Acquisition

BRC-­‐LTA-­‐16-­‐37

$195,000 $172,500 16 Open  Space  Acquisition  (LT)

$390,000 LT_Key

Northampton The  Nature  Conservancy  

Kirkridge  Easement  (Minsi  Corridor/Kittatinny  Ridge)

BRC-­‐LTA-­‐17-­‐60

$252,750 $269,700 17 Open  Space  Acquisition  (LT)

$505,500 LT_Key

Northampton The  Nature  Conservancy  

Miller/Kies  Acquisition

BRC-­‐LTA-­‐14-­‐45

$47,500 $35,400 14 Critical  Habitat  Acquisition  (LT)

$95,000 LT_Key

Northampton The  Nature  Conservancy  

Mt.  Bethel  Fens  Conservation  Plan

KEY-­‐LTP-­‐2-­‐11

$50,000 $50,000 2 Critical  Habitat  Planning  (LT)

$100,000 LT_Key

Page 449: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  449  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Northampton The Nature Conservancy

Ribitzki Land Acquisition (Minsi Lake Corridor)

BRC-LTA-19-28

$181,000.00 $181,000.00 19 Open Space Acquisition (LT)

$362,000.00 LT_Key

Northampton The Nature Conservancy

Ribitzki Land Acquisition (Minsi Lake Corridor)

BRC-LTA-19-28

$181,000.00 $181,000.00 19 Open Space Acquisition (LT)

$362,000.00 LT_Key

Northampton The Nature Conservancy

Ribitzki Land Acquisition (Minsi Lake Corridor)

BRC-LTA-19-28

$181,000.00 $181,000.00 19 Open Space Acquisition (LT)

$362,000.00 LT_Key

Northampton The  Nature  Conservancy  

Wolf  Property  Acquisition  -­‐  Minsi  Lake  Corridor

BRC-­‐LTA-­‐12-­‐32

$1,751,500 $650,000 12 Open  Space  Acquisition  (LT)

$3,503,000 LT_Key

Northampton Two  Rivers  Areas  Council  of  Governments  

Lehigh/Delaware  Rivers  &  Bushkill  Creek

KEY-­‐RCP-­‐95-­‐05

$47,700 $47,700 1 Planning  (RIV) $95,400 RIVER_Key

Northampton Upper Mount Bethel Township

Community Park - Development

BRC-PRD-19-122

$119,000.00 $119,000.00 19 Park Rehabilitation and Development (COMM)

$246,423.00 COMM_Key

Northampton Upper Mount Bethel Township

Community Park - Development

BRC-PRD-19-122

$119,000.00 $119,000.00 19 Park Rehabilitation and Development (COMM)

$246,423.00 COMM_Key

Northampton Upper Mount Bethel Township

Community Park - Development

BRC-PRD-19-122

$119,000.00 $119,000.00 19 Park Rehabilitation and Development (COMM)

$246,423.00 COMM_Key

Northampton Upper  Mount  Bethel  Township

Comprehensive  Rec.,  Park  &  Open  Space  Plan

BRC-­‐TAG-­‐8-­‐201

$22,600 $22,000 8 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$45,100 COMM_Key

Page 450: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  450  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Northampton Walnutport  Borough Earl  F.  Snyder  Park  Pavilion

BRC-­‐SC-­‐11-­‐161

$20,000 $20,000 11 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Northampton Walnutport  Borough Lehigh  Canal  Park BRC-­‐SC-­‐6-­‐186

$20,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Northampton Washington  Township

Shuman  Tract  Acquisition

BRC-­‐ACQ-­‐9-­‐224

$53,000 $53,000 9 Acquisition  (COMM)

$106,200 COMM_Key

Northampton Washington  Township

Township  Recreation  Site

BRC-­‐ACQ-­‐6-­‐192

$53,600 $50,000 6 Acquisition  (COMM)

$107,200 COMM_Key

Northampton Wildlands  Conservancy,  Inc.  

Monocacy  Creek  Restoration

BRC-­‐RCD-­‐6-­‐1

$38,743 $39,000 6 Development  (RIV)

$77,679 RIVER_Key

Northampton Williams  Township Community  Park  Master  Site  Plan

BRC-­‐TAG-­‐6-­‐209

$10,600 $10,600 6 Master  Site  Plans  (COMM)

$21,200 COMM_Key

Northampton Williams  Township Municipal  Park KEY-­‐SC-­‐4-­‐176

$20,000 $20,000 4 Small  Communities/Small  Projects  (COMM)

$28,207 COMM_Key

Northampton Wilson  Borough Fisk  Field BRC-­‐PRD-­‐13-­‐450

$200,000 $100,000 13 Park  Rehabilitation  and  Development  (COMM)

$794,300 COMM_Key

Northampton Wilson  Borough Two  Sites KEY-­‐PRD-­‐5-­‐228

$100,000 $100,000 5 Park  Rehabilitation  and  Development  (COMM)

$200,000 COMM_Key

Page 451: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  451  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Northampton Wind  Gap  Borough Wind  Gap  Borough  Park  Master  Plan

BRC-­‐TAG-­‐18-­‐153

$24,000 $24,000 18 Master  Site  Plans  (COMM)

$48,000 COMM_Key

Northampton Wind  Gap  Borough Wind  Gap  Borough  Park  Restroom

BRC-­‐SC-­‐8-­‐221

$40,000 $40,000 8 Small  Communities/Small  Projects  (COMM)

$80,000 COMM_Key

Northumberland Coal Township Arch Street Playground-Development

BRC-PRD-19-71

$100,567.00 $100,500.00 19 Park Rehabilitation and Development (COMM)

$201,134.00 COMM_Key

Northumberland Coal Township Arch Street Playground-Development

BRC-PRD-19-71

$100,567.00 $100,500.00 19 Park Rehabilitation and Development (COMM)

$201,134.00 COMM_Key

Northumberland Coal Township Arch Street Playground-Development

BRC-PRD-19-71

$100,567.00 $100,500.00 19 Park Rehabilitation and Development (COMM)

$201,134.00 COMM_Key

Northumberland

Coal  Township Mulberry  Street  Playground  Renovation

BRC-­‐PRD-­‐12-­‐140

$43,350 $43,300 12 Park  Rehabilitation  and  Development  (COMM)

$86,700 COMM_Key

Northumberland

Delaware  Township Fairchild-­‐Nicely-­‐Sterner  Recreation  Area  Development

BRC-­‐PRD-­‐12-­‐146

$200,000 $160,000 12 Park  Rehabilitation  and  Development  (COMM)

$883,000 COMM_Key

Page 452: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  452  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Northumberland

East  Cameron  Township

East  Cameron  Township  Park

BRC-­‐SC-­‐11-­‐117

$30,600 $30,600 11 Small  Communities/Small  Projects  (COMM)

$41,300 COMM_Key

Northumberland

East  Chillisquaque  Township

East  Chillisquaque  Park

KEY-­‐SC-­‐1-­‐41 $18,600 $18,600 1 Small  Communities/Small  Projects  (COMM)

$24,400 COMM_Key

Northumberland

Herndon  Borough Herndon  Community  Park-­‐  Development

BRC-­‐SC-­‐18-­‐33

$40,000 $40,000 18 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Northumberland

Kulpmont  Borough Terry  Miriello  Stadium  -­‐  Development

BRC-­‐SC-­‐17-­‐42

$40,000 $40,000 17 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Northumberland

Kulpmont  Borough Two  Sites KEY-­‐SC-­‐5-­‐104

$20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$32,000 COMM_Key

Northumberland

Lower  Mahanoy  Township

Line  Mountain  Rec.  Area

BRC-­‐PRD-­‐9-­‐119

$495,800 $150,000 9 Park  Rehabilitation  and  Development  (COMM)

$1,805,000 COMM_Key

Northumberland

Marion  Heights  Borough

Community  Park KEY-­‐SC-­‐4-­‐94 $7,145 $7,200 4 Small  Communities/Small  Projects  (COMM)

$13,245 COMM_Key

Page 453: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  453  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Northumberland

Marion  Heights  Borough

Marion  Heights  Borough  Park

BRC-­‐SC-­‐10-­‐86

$32,000 $40,000 10 Small  Communities/Small  Projects  (COMM)

$44,000 COMM_Key

Northumberland

Milton  Borough Brown  Avenue  Park  -­‐  Phase  I

BRC-­‐PRD-­‐11-­‐58

$155,000 $125,000 11 Park  Rehabilitation  and  Development  (COMM)

$310,000 COMM_Key

Northumberland

Milton  Borough Brown  Avenue  Park  -­‐  Phase  II

BRC-­‐PRD-­‐13-­‐125

$150,000 $150,000 13 Park  Rehabilitation  and  Development  (COMM)

$300,000 COMM_Key

Northumberland

Milton  Borough Brown  Avenue  Park  -­‐  Phase  III

BRC-­‐PRD-­‐13.3-­‐397

$150,000 $150,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$300,000 COMM_Key

Northumberland

Milton  Borough Community  Pool KEY-­‐PRD-­‐4-­‐104

$112,615 $100,000 4 Park  Rehabilitation  and  Development  (COMM)

$225,230 COMM_Key

Northumberland

Mount  Carmel  Borough

Peer-­‐to-­‐Peer KEY-­‐TAG-­‐5-­‐234

$7,500 $5,321 5 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$8,250 COMM_Key

Page 454: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  454  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Northumberland

Northumberland  Borough

Northumberland  Borough  &  Point  Twp.  Recreation  &  Park  Plan

BRC-­‐TAG-­‐12-­‐257

$30,000 $30,000 12 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$90,000 COMM_Key

Northumberland Northumberland Borough

Northumberland Riverfront Trail – Development

BRC-PRD-19-101

$96,342.00 $96,000.00 19 Park Rehabilitation and Development (COMM)

$196,342.00 COMM_Key

Northumberland Northumberland Borough

Northumberland Riverfront Trail – Development

BRC-PRD-19-101

$96,342.00 $96,000.00 19 Park Rehabilitation and Development (COMM)

$196,342.00 COMM_Key

Northumberland Northumberland Borough

Northumberland Riverfront Trail – Development

BRC-PRD-19-101

$96,342.00 $96,000.00 19 Park Rehabilitation and Development (COMM)

$196,342.00 COMM_Key

Northumberland

Northumberland  Borough

Pineknotter  Park BRC-­‐PRD-­‐7-­‐143

$179,000 $163,000 7 Park  Rehabilitation  and  Development  (COMM)

$605,134 COMM_Key

Northumberland

Northumberland  County

Anthracite  Outdoor  Adventure  Area  –  Phase  2  –  Development

BRC-­‐PRT-­‐17-­‐76

$1,583,828 $832,900 17 Construction $2,913,828 COMM_Key

Northumberland

Northumberland  County

Natural  Areas  Inventory

BRC-­‐TAG-­‐6-­‐131

$28,750 $28,700 6 Natural  Areas  Inventories  (COMM)

$57,500 COMM_Key

Page 455: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  455  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Northumberland

Northumberland  County

Northumberland  County  Greenway  &  Open  Space  Plan

BRC-­‐TAG-­‐14-­‐226

$79,000 $50,000 14 Greenway  Plans  (COMM)

$158,000 COMM_Key

Northumberland

Northumberland  County

Shamokin  Creek  Watershed  Plan

KEY-­‐RCP-­‐5-­‐12

$30,000 $30,000 5 Planning  (RIV) $60,000 RIVER_Key

Northumberland Point Township North Branch Canal Trail – Point Township Trail Study - Planning

BRC-TAG-19-142

$30,000.00 $30,000.00 19 Feasibility Studies (COMM)

$60,000.00 COMM_Key

Northumberland Point Township North Branch Canal Trail – Point Township Trail Study - Planning

BRC-TAG-19-142

$30,000.00 $30,000.00 19 Feasibility Studies (COMM)

$60,000.00 COMM_Key

Northumberland Point Township North Branch Canal Trail – Point Township Trail Study - Planning

BRC-TAG-19-142

$30,000.00 $30,000.00 19 Feasibility Studies (COMM)

$60,000.00 COMM_Key

Northumberland

Point  Township Township  Park KEY-­‐SC-­‐5-­‐166

$20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$26,100 COMM_Key

Northumberland

Ralpho  Township Recreation  Complex BRC-­‐SC-­‐6-­‐155

$20,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$55,472 COMM_Key

Northumberland

Ralpho  Township Recreation  Complex  Renovations/Playground

BRC-­‐SC-­‐7-­‐162

$39,123 $39,000 7 Small  Communities/Small  Projects  (COMM)

$78,245 COMM_Key

Northumberland

Shamokin  City Claude  Kehler  Park BRC-­‐PRD-­‐13.3-­‐429

$208,000 $208,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$416,050 COMM_Key

Page 456: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  456  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Northumberland Shamokin City Claude Kehler Park- Phase 2- Development

BRC-PRD-19-113

$250,000.00 $250,000.00 19 Park Rehabilitation and Development (COMM)

$500,000.00 COMM_Key

Northumberland Shamokin City Claude Kehler Park- Phase 2- Development

BRC-PRD-19-113

$250,000.00 $250,000.00 19 Park Rehabilitation and Development (COMM)

$500,000.00 COMM_Key

Northumberland Shamokin City Claude Kehler Park- Phase 2- Development

BRC-PRD-19-113

$250,000.00 $250,000.00 19 Park Rehabilitation and Development (COMM)

$500,000.00 COMM_Key

Northumberland

Shamokin  City Shroyer  Memorial  Pool

KEY-­‐PRD-­‐4-­‐137

$86,946 $87,000 4 Park  Rehabilitation  and  Development  (COMM)

$173,892 COMM_Key

Northumberland

Sunbury  City Community  Swimming  Pool

BRC-­‐PRD-­‐6-­‐177

$253,000 $185,000 6 Park  Rehabilitation  and  Development  (COMM)

$506,000 COMM_Key

Northumberland

Sunbury  City Gateway  Park  -­‐  Riverside

BRC-­‐PRD-­‐13.3-­‐436

$517,600 $250,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$1,585,300 COMM_Key

Northumberland

Sunbury  City Susquehanna  Riverfront  Park  Plan

BRC-­‐TAG-­‐9-­‐201

$67,000 $67,000 9 Master  Site  Plans  (COMM)

$134,000 COMM_Key

Page 457: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  457  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Northumberland

The  Merrill  W.  Linn  Land  &  Waterways  Conservancy  

Montandon  Marsh KEY-­‐LTA-­‐1-­‐6 $13,000 $13,000 1 Critical  Habitat  Acquisition  (LT)

$26,000 LT_Key

Northumberland

Turbotville  Borough Community  Park KEY-­‐SC-­‐4-­‐153

$20,000 $20,000 4 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Northumberland

Zerbe  Township Township  Park KEY-­‐SC-­‐3-­‐246

$19,900 $19,900 3 Small  Communities/Small  Projects  (COMM)

$19,900 COMM_Key

Northumberland

Zerbe  Township Township  Park-­‐  Development

BRC-­‐SC-­‐16-­‐52

$38,877 $40,000 16 Small  Communities/Small  Projects  (COMM)

$58,955 COMM_Key

Northumberland

Zerbe  Township Zerbe  Township  Park  Plan

BRC-­‐TAG-­‐12-­‐269

$12,500 $12,500 12 Master  Site  Plans  (COMM)

$25,000 COMM_Key

Perry Carroll  Township Carroll  Township  Community  Park

BRC-­‐PRD-­‐7-­‐35

$111,839 $53,000 7 Park  Rehabilitation  and  Development  (COMM)

$223,678 COMM_Key

Perry Carroll  Township Siegfried  Property  Acquisition

BRC-­‐ACQ-­‐11-­‐171

$149,500 $136,000 11 Acquisition  (COMM)

$299,000 COMM_Key

Perry Carroll  Township Valley  Road  Park  -­‐  Phase  I-­‐B

BRC-­‐PRD-­‐14-­‐123

$180,000 $180,000 14 Park  Rehabilitation  and  Development  (COMM)

$360,000 COMM_Key

Page 458: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  458  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Perry Central  Pennsylvania  Conservancy  

Millers  Gap  Acquisition

BRC-­‐LTA-­‐8-­‐3

$89,200 $89,000 8 Critical  Habitat  Acquisition  (LT)

$178,500 LT_Key

Perry Central  Pennsylvania  Conservancy  

Southern  Perry  County  Watershed  Conservation  Plan

BRC-­‐RCP-­‐11-­‐6

$106,700 $80,000 11 Planning  (RIV) $213,500 RIVER_Key

Perry Duncannon  Borough Duncannon  Area  Park

KEY-­‐PRD-­‐5-­‐50

$21,450 $21,400 5 Park  Rehabilitation  and  Development  (COMM)

$42,900 COMM_Key

Perry Duncannon  Borough Peer-­‐to-­‐Peer KEY-­‐TAG-­‐4-­‐2

$5,000 $5,000 4 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$5,500 COMM_Key

Perry Duncannon  Borough River  Access/Community  Center/Welcome  Center  FS

BRC-­‐RCI-­‐9-­‐7 $20,000 $20,000 9 Implementation  (RIV)

$40,000 RIVER_Key

Perry Greenwood  Township

Millerstown  Area  Community  Park  -­‐  Phase  I

BRC-­‐PRD-­‐13-­‐370

$199,800 $100,000 13 Park  Rehabilitation  and  Development  (COMM)

$399,600 COMM_Key

Perry Greenwood  Township

Millerstown  Recreational  Park

BRC-­‐ACQ-­‐11-­‐177

$252,500 $120,000 11 Acquisition  (COMM)

$504,500 COMM_Key

Perry Greenwood  Township

Millerstown  Recreational  Park

BRC-­‐TAG-­‐11-­‐210

$19,800 $19,800 11 Master  Site  Plans  (COMM)

$39,600 COMM_Key

Page 459: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  459  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Perry Greenwood  Township

Millertown  Recreational  Park  Acquisition

BRC-­‐ACQ-­‐12-­‐67

$39,900 $27,400 12 Acquisition  (COMM)

$79,800 COMM_Key

Perry Howe  Township Juniata  River  Park KEY-­‐ACQ-­‐3-­‐93

$21,200 $21,000 3 Acquisition  (COMM)

$42,500 COMM_Key

Perry Marysville  Borough Lion's  Club  Park BRC-­‐SC-­‐10-­‐88

$30,000 $30,000 10 Small  Communities/Small  Projects  (COMM)

$40,000 COMM_Key

Perry Marysville  Borough Lion's  Club  Park  Renovation

BRC-­‐PRD-­‐12-­‐169

$71,600 $71,600 12 Park  Rehabilitation  and  Development  (COMM)

$143,300 COMM_Key

Perry Marysville  Borough Lion's  Park  Pool  Feasibility  Study

BRC-­‐TAG-­‐9-­‐128

$8,000 $8,000 9 Feasibility  Studies  (COMM)

$16,000 COMM_Key

Perry Marysville  Borough Mini  Recreation  and  Park  Plan

BRC-­‐TAG-­‐7-­‐121

$5,500 $5,500 7 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$11,000 COMM_Key

Perry New  Buffalo  Borough

New  Buffalo  Park KEY-­‐SC-­‐3-­‐151

$12,400 $12,400 3 Small  Communities/Small  Projects  (COMM)

$13,600 COMM_Key

Perry Newport  Borough Newport  Riverwalk KEY-­‐RTP-­‐5-­‐11

$6,500 $12,600 5 Feasibility  Studies  (RT)

$13,600 RT_Key

Page 460: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  460  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Perry Newport  Borough Newport  Veterans  Memorial  Park-­‐  Development

BRC-­‐PRD-­‐18-­‐86

$110,618 $110,600 18 Park  Rehabilitation  and  Development  (COMM)

$221,236 COMM_Key

Perry Penn  Township Township  Park KEY-­‐SC-­‐3-­‐164

$20,000 $20,000 3 Small  Communities/Small  Projects  (COMM)

$67,000 COMM_Key

Perry Perry  County Perry  County  Greenways,  Open  Space  and  Recreation  Study

BRC-­‐TAG-­‐14-­‐228

$40,000 $35,000 14 Greenway  Plans  (COMM)

$80,000 COMM_Key

Perry Rye  Township Neal  Graham  Stager  Memorial  Playground

BRC-­‐SC-­‐8-­‐164

$33,200 $33,000 8 Small  Communities/Small  Projects  (COMM)

$46,400 COMM_Key

Perry SEDA-­‐Council  of  Governments  

Duncannon  Apple  Tree  Alleywalk

BRC-­‐TAG-­‐13.3-­‐492

$22,500 $22,500 13.3 Master  Site  Plans  (COMM)

$45,000 COMM_Key

Perry Wheatfield  Township

Hoverter  Land  Acquisition

BRC-­‐ACQ-­‐13-­‐246

$121,600 $121,000 13 Acquisition  (COMM)

$243,200 COMM_Key

Perry Wheatfield  Township

Hoverter  Land  Acquisition,  Phase  2

BRC-­‐ACQ-­‐14-­‐73

$234,700 $234,000 14 Acquisition  (COMM)

$469,300 COMM_Key

Perry Wheatfield  Township

Wagner  Community  Park

BRC-­‐SC-­‐9-­‐232

$40,000 $40,000 9 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Page 461: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  461  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Philadelphia Center  City  District   Sister  Cities  Park-­‐Development

BRC-­‐PRD-­‐16-­‐127

$500,000 $500,000 16 Park  Rehabilitation  and  Development  (COMM)

$4,600,000 COMM_Key

Philadelphia Center  City  District   Triangle  Park BRC-­‐PRD-­‐13-­‐94

$380,000 $380,000 13 Park  Rehabilitation  and  Development  (COMM)

$2,880,000 COMM_Key

Philadelphia Fairmount  Park  Commission  

Bartram's  Garden  Trail  Study  and  Master  Site  Plan

BRC-­‐TAG-­‐14-­‐204

$60,000 $50,000 14 Trail  Study  (COMM)

$120,000 COMM_Key

Philadelphia Fairmount  Park  Commission  

Benjamin  Franklin  Parkway

BRC-­‐PRD-­‐14-­‐133

$450,000 $450,000 14 Park  Rehabilitation  and  Development  (COMM)

$5,500,000 COMM_Key

Philadelphia Fairmount  Park  Commission  

Boxer  Trail  Phase  II BRC-­‐PRD-­‐11-­‐67

$340,100 $300,000 11 Park  Rehabilitation  and  Development  (COMM)

$681,400 COMM_Key

Philadelphia Fairmount  Park  Commission  

Delaware  River/Kensington  &  Tacony  Trail

BRC-­‐RTA-­‐7-­‐4

$402,000 $175,000 7 Acquisition  (RT) $847,000 RT_Key

Philadelphia Fairmount  Park  Commission  

DuPont  Crescent  Greenway

BRC-­‐PRD-­‐14-­‐134

$500,000 $400,000 14 Park  Rehabilitation  and  Development  (COMM)

$3,780,000 COMM_Key

Page 462: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  462  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Philadelphia Fairmount  Park  Commission  

East  Fairmount  Park  &  Wissahickon  Watershed

BRC-­‐PRD-­‐7-­‐70

$400,000 $377,000 7 Park  Rehabilitation  and  Development  (COMM)

$800,000 COMM_Key

Philadelphia Fairmount  Park  Commission  

Hawthorne  Park BRC-­‐PRD-­‐13.3-­‐135

$1,000,000 $1,050,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$2,016,500 COMM_Key

Philadelphia Fairmount  Park  Commission  

Manayunk  Recreation  Trail

BRC-­‐PRD-­‐13.3-­‐359

$906,000 $400,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$1,812,000 COMM_Key

Philadelphia Fairmount  Park  Commission  

Penn  Treaty  Park  Master  Site  Plan

BRC-­‐TAG-­‐13.3-­‐471

$22,500 $22,500 13.3 Master  Site  Plans  (COMM)

$45,000 COMM_Key

Philadelphia Fairmount  Park  Commission  

Pennypack  on  the  Delaware-­‐Support  Buildings

BRC-­‐PRD-­‐6-­‐61

$500,000 $200,000 6 Park  Rehabilitation  and  Development  (COMM)

$1,000,000 COMM_Key

Philadelphia Fairmount  Park  Commission  

Tacony  Creek  Park BRC-­‐PRD-­‐14-­‐137

$1,018,500 $200,000 14 Park  Rehabilitation  and  Development  (COMM)

$2,037,000 COMM_Key

Philadelphia Fairmount  Park  Commission  

Waddington  Tract BRC-­‐ACQ-­‐10-­‐182

$350,000 $350,000 10 Acquisition  (COMM)

$799,000 COMM_Key

Page 463: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  463  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Philadelphia Fairmount  Park  Commission  

Wissahickon  Valley  Park

BRC-­‐PRD-­‐14-­‐138

$150,000 $150,000 14 Park  Rehabilitation  and  Development  (COMM)

$300,000 COMM_Key

Philadelphia Natural Lands Trust, Inc.

Awbury Arboretum Conservation Easement

BRC-LTA-19-22

########## ########## 19 Open Space Acquisition (LT)

$2,857,500.00 LT_Key

Philadelphia Natural Lands Trust, Inc.

Awbury Arboretum Conservation Easement

BRC-LTA-19-22

########## ########## 19 Open Space Acquisition (LT)

$2,857,500.00 LT_Key

Philadelphia Natural Lands Trust, Inc.

Awbury Arboretum Conservation Easement

BRC-LTA-19-22

########## ########## 19 Open Space Acquisition (LT)

$2,857,500.00 LT_Key

Philadelphia Natural Lands Trust, Inc.

Citizens Bank Property Acquisition

BRC-LTA-19-23

$861,500.00 $861,500.00 19 Critical Habitat Acquisition (LT)

$1,723,000.00 LT_Key

Philadelphia Natural Lands Trust, Inc.

Citizens Bank Property Acquisition

BRC-LTA-19-23

$861,500.00 $861,500.00 19 Critical Habitat Acquisition (LT)

$1,723,000.00 LT_Key

Philadelphia Natural Lands Trust, Inc.

Citizens Bank Property Acquisition

BRC-LTA-19-23

$861,500.00 $861,500.00 19 Critical Habitat Acquisition (LT)

$1,723,000.00 LT_Key

Philadelphia Natural  Lands  Trust,  Inc.  

Roxborough  Reservoir  Conservation  and  Management  Plan

BRC-­‐LTP-­‐17-­‐15

$25,000 $25,000 17 Conservation/Sound  Land  Use  (COMM)

$55,500 LT_Key

Philadelphia Natural  Lands  Trust,  Inc.  

Schuylkill  Center  Conservation  Easement

BRC-­‐LTA-­‐13-­‐32

$1,500,000 $750,000 13 Critical  Habitat  Acquisition  (LT)

$40,963,400 LT_Key

Philadelphia Natural Lands Trust, Inc.

Sheet Metal Workers Union Property

BRC-LTA-19-26

$924,200.00 $674,000.00 19 Critical Habitat Acquisition (LT)

$1,848,400.00 LT_Key

Page 464: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  464  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Philadelphia Natural Lands Trust, Inc.

Sheet Metal Workers Union Property

BRC-LTA-19-26

$924,200.00 $674,000.00 19 Critical Habitat Acquisition (LT)

$1,848,400.00 LT_Key

Philadelphia Natural Lands Trust, Inc.

Sheet Metal Workers Union Property

BRC-LTA-19-26

$924,200.00 $674,000.00 19 Critical Habitat Acquisition (LT)

$1,848,400.00 LT_Key

Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust

Comprehensive Neighborhood Garden Plan

BRC-LTP-19-151

$50,000.00 $50,000.00 19 Open Space Planning (LT)

$100,020.00 LT_Key

Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust

Comprehensive Neighborhood Garden Plan

BRC-LTP-19-151

$50,000.00 $50,000.00 19 Open Space Planning (LT)

$100,020.00 LT_Key

Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust

Comprehensive Neighborhood Garden Plan

BRC-LTP-19-151

$50,000.00 $50,000.00 19 Open Space Planning (LT)

$100,020.00 LT_Key

Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust

Comprehensive Neighborhood Garden Plan

BRC-LTP-19-151

$50,000.00 $50,000.00 19 Open Space Planning (LT)

$100,020.00 LT_Key

Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust

Comprehensive Neighborhood Garden Plan

BRC-LTP-19-151

$50,000.00 $50,000.00 19 Open Space Planning (LT)

$100,020.00 LT_Key

Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust

Comprehensive Neighborhood Garden Plan

BRC-LTP-19-151

$50,000.00 $50,000.00 19 Open Space Planning (LT)

$100,020.00 LT_Key

Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust

Comprehensive Neighborhood Garden Plan

BRC-LTP-19-151

$50,000.00 $50,000.00 19 Open Space Planning (LT)

$100,020.00 LT_Key

Page 465: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  465  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust

Comprehensive Neighborhood Garden Plan

BRC-LTP-19-151

$50,000.00 $50,000.00 19 Open Space Planning (LT)

$100,020.00 LT_Key

Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust

Comprehensive Neighborhood Garden Plan

BRC-LTP-19-151

$50,000.00 $50,000.00 19 Open Space Planning (LT)

$100,020.00 LT_Key

Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust

Comprehensive Neighborhood Garden Plan

BRC-LTP-19-151

$50,000.00 $50,000.00 19 Open Space Planning (LT)

$100,020.00 LT_Key

Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust

Comprehensive Neighborhood Garden Plan

BRC-LTP-19-151

$50,000.00 $50,000.00 19 Open Space Planning (LT)

$100,020.00 LT_Key

Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust

Comprehensive Neighborhood Garden Plan

BRC-LTP-19-151

$50,000.00 $50,000.00 19 Open Space Planning (LT)

$100,020.00 LT_Key

Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust

Comprehensive Neighborhood Garden Plan

BRC-LTP-19-151

$50,000.00 $50,000.00 19 Open Space Planning (LT)

$100,020.00 LT_Key

Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust

Comprehensive Neighborhood Garden Plan

BRC-LTP-19-151

$50,000.00 $50,000.00 19 Open Space Planning (LT)

$100,020.00 LT_Key

Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust

Comprehensive Neighborhood Garden Plan

BRC-LTP-19-151

$50,000.00 $50,000.00 19 Open Space Planning (LT)

$100,020.00 LT_Key

Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust

Comprehensive Neighborhood Garden Plan

BRC-LTP-19-151

$50,000.00 $50,000.00 19 Open Space Planning (LT)

$100,020.00 LT_Key

Page 466: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  466  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust

Comprehensive Neighborhood Garden Plan

BRC-LTP-19-151

$50,000.00 $50,000.00 19 Open Space Planning (LT)

$100,020.00 LT_Key

Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust

Comprehensive Neighborhood Garden Plan

BRC-LTP-19-151

$50,000.00 $50,000.00 19 Open Space Planning (LT)

$100,020.00 LT_Key

Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust

Comprehensive Neighborhood Garden Plan

BRC-LTP-19-151

$50,000.00 $50,000.00 19 Open Space Planning (LT)

$100,020.00 LT_Key

Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust

Comprehensive Neighborhood Garden Plan

BRC-LTP-19-151

$50,000.00 $50,000.00 19 Open Space Planning (LT)

$100,020.00 LT_Key

Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust

Comprehensive Neighborhood Garden Plan

BRC-LTP-19-151

$50,000.00 $50,000.00 19 Open Space Planning (LT)

$100,020.00 LT_Key

Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust

Comprehensive Neighborhood Garden Plan

BRC-LTP-19-151

$50,000.00 $50,000.00 19 Open Space Planning (LT)

$100,020.00 LT_Key

Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust

Comprehensive Neighborhood Garden Plan

BRC-LTP-19-151

$50,000.00 $50,000.00 19 Open Space Planning (LT)

$100,020.00 LT_Key

Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust

Comprehensive Neighborhood Garden Plan

BRC-LTP-19-151

$50,000.00 $50,000.00 19 Open Space Planning (LT)

$100,020.00 LT_Key

Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust

Comprehensive Neighborhood Garden Plan

BRC-LTP-19-151

$50,000.00 $50,000.00 19 Open Space Planning (LT)

$100,020.00 LT_Key

Page 467: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  467  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust

Comprehensive Neighborhood Garden Plan

BRC-LTP-19-151

$50,000.00 $50,000.00 19 Open Space Planning (LT)

$100,020.00 LT_Key

Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust

Comprehensive Neighborhood Garden Plan

BRC-LTP-19-151

$50,000.00 $50,000.00 19 Open Space Planning (LT)

$100,020.00 LT_Key

Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust

Comprehensive Neighborhood Garden Plan

BRC-LTP-19-151

$50,000.00 $50,000.00 19 Open Space Planning (LT)

$100,020.00 LT_Key

Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust

Comprehensive Neighborhood Garden Plan

BRC-LTP-19-151

$50,000.00 $50,000.00 19 Open Space Planning (LT)

$100,020.00 LT_Key

Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust

Comprehensive Neighborhood Garden Plan

BRC-LTP-19-151

$50,000.00 $50,000.00 19 Open Space Planning (LT)

$100,020.00 LT_Key

Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust

Comprehensive Neighborhood Garden Plan

BRC-LTP-19-151

$50,000.00 $50,000.00 19 Open Space Planning (LT)

$100,020.00 LT_Key

Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust

Comprehensive Neighborhood Garden Plan

BRC-LTP-19-151

$50,000.00 $50,000.00 19 Open Space Planning (LT)

$100,020.00 LT_Key

Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust

Comprehensive Neighborhood Garden Plan

BRC-LTP-19-151

$50,000.00 $50,000.00 19 Open Space Planning (LT)

$100,020.00 LT_Key

Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust

Comprehensive Neighborhood Garden Plan

BRC-LTP-19-151

$50,000.00 $50,000.00 19 Open Space Planning (LT)

$100,020.00 LT_Key

Page 468: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  468  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust

Comprehensive Neighborhood Garden Plan

BRC-LTP-19-151

$50,000.00 $50,000.00 19 Open Space Planning (LT)

$100,020.00 LT_Key

Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust

Comprehensive Neighborhood Garden Plan

BRC-LTP-19-151

$50,000.00 $50,000.00 19 Open Space Planning (LT)

$100,020.00 LT_Key

Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust

Comprehensive Neighborhood Garden Plan

BRC-LTP-19-151

$50,000.00 $50,000.00 19 Open Space Planning (LT)

$100,020.00 LT_Key

Philadelphia Neighborhood Gardens Association- A Philadelphia Land Trust

Comprehensive Neighborhood Garden Plan

BRC-LTP-19-151

$50,000.00 $50,000.00 19 Open Space Planning (LT)

$100,020.00 LT_Key

Philadelphia Pennsylvania  Environmental  Council,  Inc.  

Delaware  Riverfront  Trail  Connections  Program

BRC-­‐RCI-­‐12-­‐12

$150,000 $150,000 12 Implementation  (RIV)

$300,000 RIVER_Key

Philadelphia Philadelphia  Authority  for  Industrial  Development  

Navy  Yard  Riverfront  Greenway

BRC-­‐PRD-­‐11-­‐66

$622,500 $250,000 11 Park  Rehabilitation  and  Development  (COMM)

$1,245,000 COMM_Key

Philadelphia Philadelphia  City Allens  Lane  Park  and  Belmont  Grove

KEY-­‐PRD-­‐4-­‐126

$400,000 $400,000 4 Park  Rehabilitation  and  Development  (COMM)

$800,000 COMM_Key

Page 469: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  469  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Philadelphia Philadelphia  City Cedar,  Pleasant  Hill  and  Three  Bears  Parks

BRC-­‐PRD-­‐12-­‐185

$1,187,500 $600,000 12 Park  Rehabilitation  and  Development  (COMM)

$2,375,000 COMM_Key

Philadelphia Philadelphia  City City  Playgrounds/Fairmount  Park  Path

KEY-­‐PRD-­‐1-­‐107

$600,000 $275,000 1 Park  Rehabilitation  and  Development  (COMM)

$1,200,000 COMM_Key

Philadelphia Philadelphia  City Clark,  Connell,  Jefferson  &  Pulaski  Parks

BRC-­‐PRD-­‐11-­‐68

$400,000 $400,000 11 Park  Rehabilitation  and  Development  (COMM)

$800,000 COMM_Key

Philadelphia Philadelphia City Cobbs Creek Trail - 70th Street to Woodland Avenue - Development

BRC-PRD-19-102

$275,000.00 $275,000.00 19 Park Rehabilitation and Development (COMM)

$595,000.00 COMM_Key

Philadelphia Philadelphia City Cobbs Creek Trail - 70th Street to Woodland Avenue - Development

BRC-PRD-19-102

$275,000.00 $275,000.00 19 Park Rehabilitation and Development (COMM)

$595,000.00 COMM_Key

Philadelphia Philadelphia City Cobbs Creek Trail - 70th Street to Woodland Avenue - Development

BRC-PRD-19-102

$275,000.00 $275,000.00 19 Park Rehabilitation and Development (COMM)

$595,000.00 COMM_Key

Page 470: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  470  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Philadelphia Philadelphia  City Delaware  and  Allegheny  Greenway

BRC-­‐PRD-­‐14-­‐163

$260,000 $200,000 14 Park  Rehabilitation  and  Development  (COMM)

$2,871,000 COMM_Key

Philadelphia Philadelphia  City Dickinson  Square  Park

BRC-­‐PRD-­‐14-­‐162

$425,000 $300,000 14 Park  Rehabilitation  and  Development  (COMM)

$850,000 COMM_Key

Philadelphia Philadelphia  City East  Fairmount  Park  Stormwater  Management  Improvements

BRC-­‐PRD-­‐16-­‐247

$300,000 $250,000 16 Park  Rehabilitation  and  Development  (COMM)

$600,000 COMM_Key

Philadelphia Philadelphia  City Ingersoll  Park-­‐Development

BRC-­‐PRD-­‐18-­‐90

$438,002 $438,000 18 Park  Rehabilitation  and  Development  (COMM)

$876,005 COMM_Key

Philadelphia Philadelphia  City Julian  Abele  Park-­‐Development

BRC-­‐PRD-­‐15-­‐68

$134,000 $75,000 15 Park  Rehabilitation  and  Development  (COMM)

$268,000 COMM_Key

Philadelphia Philadelphia  City Lonnie  Young  Recreation  Center

KEY-­‐PRD-­‐4-­‐125

$400,000 $800,000 4 Park  Rehabilitation  and  Development  (COMM)

$800,000 COMM_Key

Page 471: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  471  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Philadelphia Philadelphia  City Mt.  Airy,  Parkside,  Sturgis  Playgrounds,  Brewerytown  Rec.

BRC-­‐PRD-­‐13-­‐134

$600,000 $530,000 13 Park  Rehabilitation  and  Development  (COMM)

$1,200,000 COMM_Key

Philadelphia Philadelphia  City Neighborhood  Park  Rehab.  -­‐  Phase  II

BRC-­‐PRD-­‐8-­‐152

$1,100,000 $500,000 8 Park  Rehabilitation  and  Development  (COMM)

$2,200,000 COMM_Key

Philadelphia Philadelphia  City Neighborhood  Parks  Revitalization

BRC-­‐PRD-­‐7-­‐154

$1,000,000 $1,000,000 7 Park  Rehabilitation  and  Development  (COMM)

$3,715,000 COMM_Key

Philadelphia Philadelphia City Penn Treaty Park - Phase 1-Development

BRC-PRD-19-103

$100,000.00 $100,000.00 19 Park Rehabilitation and Development (COMM)

$300,000.00 COMM_Key

Philadelphia Philadelphia City Penn Treaty Park - Phase 1-Development

BRC-PRD-19-103

$100,000.00 $100,000.00 19 Park Rehabilitation and Development (COMM)

$300,000.00 COMM_Key

Philadelphia Philadelphia City Penn Treaty Park - Phase 1-Development

BRC-PRD-19-103

$100,000.00 $100,000.00 19 Park Rehabilitation and Development (COMM)

$300,000.00 COMM_Key

Page 472: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  472  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Philadelphia Philadelphia  City Pennypack  Trail KEY-­‐PRD-­‐2-­‐121

$750,000 $750,000 2 Park  Rehabilitation  and  Development  (COMM)

$1,500,000 COMM_Key

Philadelphia Philadelphia  City Philadelphia  City  -­‐  Recreation  Areas

BRC-­‐PRD-­‐10-­‐133

$1,200,000 $300,000 10 Park  Rehabilitation  and  Development  (COMM)

$2,400,000 COMM_Key

Philadelphia Philadelphia  City Philadelphia  Comprehensive  Open  Space  Plan

BRC-­‐TAG-­‐11-­‐261

$300,000 $325,000 11 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$650,000 COMM_Key

Philadelphia Philadelphia  City Pleasant  Hill  Park  -­‐  Development

BRC-­‐PRD-­‐17-­‐146

$347,000 $318,000 17 Park  Rehabilitation  and  Development  (COMM)

$694,000 COMM_Key

Philadelphia Philadelphia  City Pleasant  Hill  Park  Plan

BRC-­‐TAG-­‐9-­‐165

$50,000 $50,000 9 Master  Site  Plans  (COMM)

$100,000 COMM_Key

Philadelphia Philadelphia  City Poquessing  Creek  Trail  -­‐  Development

BRC-­‐PRD-­‐18-­‐91

$500,000 $500,000 18 Park  Rehabilitation  and  Development  (COMM)

$1,090,578 COMM_Key

Philadelphia Philadelphia City Pulaski Park - Phase 3 - Development

BRC-PRD-19-104

$500,000.00 $500,000.00 19 Park Rehabilitation and Development (COMM)

$1,000,000.00 COMM_Key

Page 473: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  473  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Philadelphia Philadelphia City Pulaski Park - Phase 3 - Development

BRC-PRD-19-104

$500,000.00 $500,000.00 19 Park Rehabilitation and Development (COMM)

$1,000,000.00 COMM_Key

Philadelphia Philadelphia City Pulaski Park - Phase 3 - Development

BRC-PRD-19-104

$500,000.00 $500,000.00 19 Park Rehabilitation and Development (COMM)

$1,000,000.00 COMM_Key

Philadelphia Philadelphia City Pulaski Park - Phase 3 - Development

BRC-PRD-19-104

$500,000.00 $500,000.00 19 Park Rehabilitation and Development (COMM)

$1,000,000.00 COMM_Key

Philadelphia Philadelphia  City Schuylkill  Recreation  Path

BRC-­‐PRD-­‐6-­‐145

$400,000 $400,000 6 Park  Rehabilitation  and  Development  (COMM)

$800,000 COMM_Key

Philadelphia Philadelphia  City Schuylkill  Recreation  Pathway

KEY-­‐PRD-­‐5-­‐159

$400,000 $820,000 5 Park  Rehabilitation  and  Development  (COMM)

$800,000 COMM_Key

Philadelphia Philadelphia City Schuylkill River Trail - Grays Ferry Bridge - Development

BRC-PRD-19-112

$500,000.00 $300,000.00 19 Park Rehabilitation and Development (COMM)

$8,595,050.00 COMM_Key

Philadelphia Philadelphia City Schuylkill River Trail - Grays Ferry Bridge - Development

BRC-PRD-19-112

$500,000.00 $300,000.00 19 Park Rehabilitation and Development (COMM)

$8,595,050.00 COMM_Key

Page 474: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  474  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Philadelphia Philadelphia City Schuylkill River Trail - Grays Ferry Bridge - Development

BRC-PRD-19-112

$500,000.00 $300,000.00 19 Park Rehabilitation and Development (COMM)

$8,595,050.00 COMM_Key

Philadelphia Philadelphia City Schuylkill River Trail - Grays Ferry Bridge - Development

BRC-PRD-19-112

$500,000.00 $300,000.00 19 Park Rehabilitation and Development (COMM)

$8,595,050.00 COMM_Key

Philadelphia Philadelphia  City Schuylkill  River  Trail  -­‐  South  Street  to  Christian  Street  -­‐  Development

BRC-­‐PRD-­‐18-­‐97

$225,000 $225,000 18 Park  Rehabilitation  and  Development  (COMM)

$1,196,083 COMM_Key

Philadelphia Philadelphia  City Seven  Recreation  Sites

BRC-­‐PRD-­‐9-­‐166

$525,000 $500,000 9 Park  Rehabilitation  and  Development  (COMM)

$1,050,000 COMM_Key

Philadelphia Philadelphia  City Shevchenko  Park-­‐Development

BRC-­‐PRD-­‐16-­‐154

$350,000 $300,000 16 Park  Rehabilitation  and  Development  (COMM)

$728,000 COMM_Key

Philadelphia Philadelphia  City Six  Sites BRC-­‐PRD-­‐13.3-­‐608

$1,250,000 $1,000,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$2,805,000 COMM_Key

Philadelphia Philadelphia  City South  Schuylkill  Property  Acquisition

BRC-­‐ACQ-­‐17-­‐224

$250,000 $200,000 17 Acquisition  (COMM)

$500,000 COMM_Key

Page 475: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  475  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Philadelphia Philadelphia  City Swimming  Pools  Rehabilitation

KEY-­‐PRD-­‐3-­‐171

$380,000 $360,000 3 Park  Rehabilitation  and  Development  (COMM)

$1,520,000 COMM_Key

Philadelphia Philadelphia  City Three  Sites  -­‐  Development

BRC-­‐PRD-­‐18-­‐199

$800,000 $800,000 17 Park  Rehabilitation  and  Development  (COMM)

$4,800,007 COMM_Key

Philadelphia Philadelphia  City Weccacoe  Park-­‐  Development

BRC-­‐PRD-­‐18-­‐92

$250,000 $194,400 18 Park  Rehabilitation  and  Development  (COMM)

$750,000 COMM_Key

Philadelphia Philadelphia  City Wissahickon  Creek  Conservation  Plan

KEY-­‐RCP-­‐95-­‐12

$50,000 $50,000 1 Planning  (RIV) $100,000 RIVER_Key

Philadelphia Philadelphia  Department  of  Commerce  

Tidal  Schuylkill  River  Greenway  Trail

BRC-­‐PRD-­‐9-­‐167

$800,000 $500,000 9 Park  Rehabilitation  and  Development  (COMM)

$2,300,000 COMM_Key

Philadelphia Philadelphia  Water  Department  

Delaware  Watershed  Conservation  and  Public  Access  Plan

BRC-­‐RCP-­‐12-­‐13

$170,000 $70,000 12 Planning  (RIV) $340,000 COMM_Key

Philadelphia Philadelphia  Water  Department  

Delaware  Watershed  Conservation  and  Public  Access  Plan

BRC-­‐RCP-­‐12-­‐13

$170,000 $100,000 12 Planning  (RIV) $340,000 RIVER_Key

Page 476: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  476  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Philadelphia Philadelphia  Water  Department  

Fairmount  Dam  Fish  Ladder

BRC-­‐RCD-­‐13.3-­‐549

$200,000 $200,000 13.3 Development  (RIV)

$2,400,000 RIVER_Key

Philadelphia Philadelphia  Water  Department  

Interpretive  Center BRC-­‐RCD-­‐7-­‐13

$243,537 $240,000 7 Development  (RIV)

$2,647,484 RIVER_Key

Philadelphia Philadelphia  Water  Department  

Liberty  Lands  Park BRC-­‐PRD-­‐13.3-­‐411

$135,000 $135,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$311,000 COMM_Key

Philadelphia Philadelphia  Water  Department  

Tacony-­‐Frankford  Watershed

BRC-­‐RCP-­‐7-­‐14

$100,000 $100,000 7 Planning  (RIV) $274,700 RIVER_Key

Philadelphia Philadelphia  Water  Department  

Waterwork  Impervious  Surfaces  Study

BRC-­‐TAG-­‐13.3-­‐230

$150,000 $100,000 13.3 Master  Site  Plans  (COMM)

$300,000 COMM_Key

Philadelphia Resources  for  Human  Development,  Inc.  

Kitchens  Lane  Stewardship  Project

BRC-­‐RCD-­‐8-­‐2

$29,000 $29,000 8 Development  (RIV)

$58,300 RIVER_Key

Philadelphia Schuylkill  River  Development  Corporation  

Schuylkill  River  Trail KEY-­‐RTD-­‐4-­‐20

$200,000 $100,000 4 Rail  Rehabilitation  and  Development  (RT)

$4,113,230 RT_Key

Philadelphia The  Free  Library  of  Philadelphia  

Central  Library  Green  Roof

BRC-­‐PRD-­‐13.3-­‐174

$2,465,200 $50,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$4,930,500 COMM_Key

Philadelphia Zoological  Society  of  Philadelphia  

Philadelphia  Zoo  -­‐  Primate  Center

KEY-­‐ZOO-­‐94-­‐4

$1,400,000 $1,400,000 1 Zoo $2,800,000 COMM_Key

Page 477: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  477  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Pike Delaware  Highlands  Conservancy  

Beaver  Run  Hunting  and  Fishing  Club  Easement

BRC-­‐LTA-­‐17-­‐217

$1,107,300 $550,000 17 Open  Space  Acquisition  (LT)

$2,217,300 LT_Key

Pike Delaware  Highlands  Conservancy  

Camp  Speers  Eljabar  Easement

BRC-­‐LTA-­‐13-­‐33

$741,500 $740,000 13 Open  Space  Acquisition  (LT)

$1,483,000 LT_Key

Pike Delaware  Highlands  Conservancy  

Pike  County  Greenway  Acquisition

BRC-­‐LTA-­‐8-­‐5

$901,500 $384,000 8 Open  Space  Acquisition  (LT)

$1,815,000 LT_Key

Pike Delaware  Township Camp  Akenac  Acquisition

BRC-­‐ACQ-­‐13-­‐249

$406,600 $350,000 13 Acquisition  (COMM)

$813,200 COMM_Key

Pike Delaware  Township Township  Park KEY-­‐SC-­‐1-­‐37 $20,000 $20,000 1 Small  Communities/Small  Projects  (COMM)

$25,269 COMM_Key

Pike Dingman  Township Bridge  Preserve  Master  Site  Plan

BRC-­‐TAG-­‐14-­‐197

$27,000 $27,000 14 Master  Site  Plans  (COMM)

$54,000 COMM_Key

Pike Dingman  Township Municipal  Park  Acquisition

BRC-­‐ACQ-­‐9-­‐62

$147,600 $140,000 9 Acquisition  (COMM)

$295,200 COMM_Key

Pike Dingman  Township Township  Park BRC-­‐PRD-­‐13.3-­‐350

$400,000 $200,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$825,600 COMM_Key

Pike Lackawaxen  Township

Lackawaxen  Township  Conservation  Plan  for  Recreational  Park

BRC-­‐TAG-­‐16-­‐248

$19,542 $19,500 16 Master  Site  Plans  (COMM)

$39,084 COMM_Key

Page 478: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  478  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Pike Lackawaxen  Township

Shook  Land  Acquisition

BRC-­‐LTA-­‐16-­‐235

$355,642 $355,000 16 Acquisition  (COMM)

$711,284 COMM_Key

Pike Lehman  Township Community  Park  -­‐  Development

BRC-­‐PRD-­‐13-­‐383

$300,000 $200,000 13 Park  Rehabilitation  and  Development  (COMM)

$600,000 COMM_Key

Pike Lehman  Township Community  Park  Acquisition

BRC-­‐ACQ-­‐11-­‐178

$461,500 $200,000 11 Acquisition  (COMM)

$923,000 COMM_Key

Pike Lehman  Township Community  Park  Master  Plan

BRC-­‐TAG-­‐11-­‐217

$34,807 $35,000 11 Master  Site  Plans  (COMM)

$69,614 COMM_Key

Pike Lehman  Township Lehman  Township  Community  Park  -­‐  Special  Study

BRC-­‐TAG-­‐12-­‐244

$20,000 $20,000 12 Feasibility  Studies  (COMM)

$40,000 COMM_Key

Pike Matamoras  Borough Airport  Park BRC-­‐PRD-­‐13.3-­‐392

$50,000 $50,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$100,000 COMM_Key

Pike Matamoras  Borough MacDonald  Property KEY-­‐ACQ-­‐3-­‐129

$24,000 $24,000 3 Acquisition  (COMM)

$48,000 COMM_Key

Pike Matamoras  Borough Matamoras  Airport  Park

BRC-­‐TAG-­‐7-­‐122

$13,000 $13,000 7 Master  Site  Plans  (COMM)

$26,000 COMM_Key

Pike Milford  Borough Milford  Borough  Skatepark  Development

BRC-­‐SC-­‐12-­‐109

$30,000 $30,000 12 Small  Communities/Small  Projects  (COMM)

$40,000 COMM_Key

Pike Municipal  Authority  of  the  Borough  of  Milford  

Sawkill  Creek  Watershed

BRC-­‐ACQ-­‐11-­‐181

$156,500 $82,700 11 Acquisition  (COMM)

$418,000 COMM_Key

Page 479: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  479  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Pike Palmyra  Township Park  Pavillion BRC-­‐SC-­‐8-­‐142

$20,000 $20,000 8 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Pike Palmyra  Township Township  Park KEY-­‐SC-­‐4-­‐121

$20,000 $20,000 4 Small  Communities/Small  Projects  (COMM)

$25,380 COMM_Key

Pike Pike  County Forecasting  Land  Use  Change

BRC-­‐TAG-­‐11.5-­‐31

$25,000 $25,000 11.5 Conservation/Sound  Land  Use  (COMM)

$62,200 COMM_Key

Pike Pike  County Lackawaxen-­‐Shohola  Open  Space,  Greenway  and  Rec  Plan

BRC-­‐TAG-­‐13-­‐201

$27,500 $27,500 13 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$55,000 COMM_Key

Pike Pike  County Lackawaxen-­‐Upper  Delaware  River  Greenways  Plan

BRC-­‐TAG-­‐18-­‐143

$30,100 $30,100 18 Greenway  Plans  (COMM)

$61,435 COMM_Key

Pike Pike  County Matamoras  Borough  &  Westfall  Township  Rec.  &  Greenway  Plan

BRC-­‐TAG-­‐14-­‐231

$30,000 $30,000 14 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$90,000 COMM_Key

Pike Pike  County Open  Space  Greenways  &  Recreation  Plan

BRC-­‐TAG-­‐11-­‐232

$49,000 $45,000 11 Greenway  Plans  (COMM)

$98,000 COMM_Key

Pike Pike  County Park  Master  Site  Plan

KEY-­‐TAG-­‐4-­‐127

$9,900 $9,900 4 Master  Site  Plans  (COMM)

$19,800 COMM_Key

Page 480: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  480  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Pike Pike  County Peer-­‐to-­‐Peer KEY-­‐TAG-­‐6-­‐2

$7,500 $7,500 6 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$8,250 COMM_Key

Pike Pike  County Pike  County  Land  Investment  Acquisition

BRC-­‐ACQ-­‐18-­‐8

$842,500 $819,000 18 Acquisition  (COMM)

$1,685,000 COMM_Key

Pike Pike  County Pike  County  Scenic  Rural  Character  Preservation  Bond  Support

BRC-­‐TAG-­‐14-­‐232

$30,000 $30,000 14 Education  and  Training  (COMM)

$60,000 COMM_Key

Pike Pike  County Pinchot  Greenway-­‐Feasibility  Study  &  Master  Plan

BRC-­‐TAG-­‐8-­‐155

$135,000 $30,000 8 Greenway  Plans  (COMM)

$270,000 COMM_Key

Pike Pike  County Rock  Hill  Land  Acquisition

BRC-­‐ACQ-­‐17-­‐99

$1,725,000 $1,126,000 17 Acquisition  (COMM)

$3,450,000 COMM_Key

Pike Pike  County Sawkill  Creek-­‐Vandermark  Creek  Watershed  Plan

KEY-­‐RCP-­‐5-­‐6

$35,000 $35,000 5 Planning  (RIV) $71,000 RIVER_Key

Pike Shohola  Township Rohman  Park BRC-­‐PRD-­‐13-­‐142

$88,500 $88,000 13 Park  Rehabilitation  and  Development  (COMM)

$177,000 COMM_Key

Pike Shohola  Township Rohman  Park KEY-­‐PRD-­‐5-­‐182

$54,000 $54,000 5 Park  Rehabilitation  and  Development  (COMM)

$108,000 COMM_Key

Page 481: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  481  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Pike Shohola  Township Rohman  Park-­‐Phase  2-­‐Development

BRC-­‐PRD-­‐18-­‐100

$94,146 $94,000 18 Park  Rehabilitation  and  Development  (COMM)

$191,584 COMM_Key

Pike The  Nature  Conservancy  

Upper  Delaware  Corridor  Protection  Plan

BRC-­‐RCI-­‐11-­‐15

$56,300 $50,000 11 Implementation  (RIV)

$112,500 RIVER_Key

Pike Trust  for  Public  Land   KD  Land  Acquisition BRC-­‐LTA-­‐17-­‐61

$600,000 $600,000 17 Open  Space  Acquisition  (LT)

$1,200,000 LT_Key

Pike Trust  for  Public  Land   Milford  Reservation  Acquisition

KEY-­‐LTA-­‐2-­‐16

$400,000 $500,000 2 Open  Space  Acquisition  (LT)

$1,000,000 LT_Key

Pike Wildlands  Conservancy,  Inc.  

Checho  Property BRC-­‐LTA-­‐6-­‐24

$239,400 $200,000 6 Critical  Habitat  Acquisition  (LT)

$919,400 LT_Key

Potter Austin  Borough Austin  Dam  Mem.  Park  &  Bayless  Papermill  Master  Site  Plan

BRC-­‐TAG-­‐14-­‐192

$30,500 $30,500 14 Master  Site  Plans  (COMM)

$61,000 COMM_Key

Potter Austin  Borough Baseball  and  Multi-­‐purpose  Fields

BRC-­‐PRD-­‐8-­‐19

$55,000 $55,000 8 Park  Rehabilitation  and  Development  (COMM)

$110,000 COMM_Key

Potter Coudersport  Borough

Borough  Pool  Feasibility  Study

BRC-­‐TAG-­‐13-­‐181

$12,500 $12,500 13 Feasibility  Studies  (COMM)

$25,000 COMM_Key

Page 482: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  482  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Potter Galeton  Borough Galeton  Park-­‐  Phase  I  (AKA)  Centertown  Park  or  John  Collins  Memorial  Park-­‐  Development

BRC-­‐PRD-­‐12-­‐155

$99,000 $99,000 12 Park  Rehabilitation  and  Development  (COMM)

$180,000 COMM_Key

Potter Potter  County North  Fork  Park KEY-­‐ACQ-­‐4-­‐130

$42,500 $40,000 4 Acquisition  (COMM)

$85,000 COMM_Key

Potter Potter  County Northfork  Master  Plan

BRC-­‐TAG-­‐7-­‐157

$10,260 $10,000 7 Master  Site  Plans  (COMM)

$20,520 COMM_Key

Potter Roulette  Township Skate  Park BRC-­‐SC-­‐11-­‐152

$40,000 $40,000 11 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Potter Shinglehouse  Borough

Assembly  Park BRC-­‐SC-­‐6-­‐166

$20,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$21,200 COMM_Key

Potter Shinglehouse  Borough

Assembly  Park KEY-­‐SC-­‐1-­‐126

$18,900 $18,900 1 Small  Communities/Small  Projects  (COMM)

$19,900 COMM_Key

Schuylkill Ashland  Borough Higher-­‐Up  Park  Tot  Lot  Area  Renovation

BRC-­‐SC-­‐12-­‐80

$30,000 $30,000 12 Small  Communities/Small  Projects  (COMM)

$42,000 COMM_Key

Schuylkill Ashland  Borough Master  Site  Plans  -­‐  3  Parks

BRC-­‐TAG-­‐9-­‐12

$30,000 $30,000 9 Master  Site  Plans  (COMM)

$60,000 COMM_Key

Page 483: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  483  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Schuylkill Branch  Township Llewellyn  Community  Park

KEY-­‐SC-­‐1-­‐18 $18,650 $18,600 1 Small  Communities/Small  Projects  (COMM)

$18,650 COMM_Key

Schuylkill Branch  Township Westwest  Terrace  Playground

KEY-­‐SC-­‐5-­‐21 $20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Schuylkill Butler  Township Locustdale  Rec.  Area  Master  Plan

KEY-­‐TAG-­‐5-­‐26

$11,000 $11,000 5 Master  Site  Plans  (COMM)

$22,000 COMM_Key

Schuylkill Cass  Township Forestville  Park-­‐  Development

BRC-­‐SC-­‐18-­‐27

$40,000 $40,000 18 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Schuylkill Cass  Township Forestville  Playground

BRC-­‐SC-­‐14-­‐78

$40,000 $40,000 14 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Schuylkill Cass  Township Forestville  Playground  Improvements

BRC-­‐SC-­‐12-­‐86

$40,000 $40,000 12 Small  Communities/Small  Projects  (COMM)

$70,000 COMM_Key

Schuylkill Cass  Township Heckscherville  Playground

BRC-­‐SC-­‐6-­‐31

$20,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$30,000 COMM_Key

Schuylkill Cass  Township Heckscherville  Playground  -­‐  Development

BRC-­‐SC-­‐17-­‐30

$40,000 $40,000 17 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Page 484: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  484  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Schuylkill Coaldale  Borough Ridge  Terrace  Walking  Track

BRC-­‐SC-­‐10-­‐73

$27,000 $27,000 10 Small  Communities/Small  Projects  (COMM)

$34,000 COMM_Key

Schuylkill East  Brunswick  Township

Park  Land  Acquisition

BRC-­‐ACQ-­‐14-­‐54

$26,600 $26,100 14 Acquisition  (COMM)

$53,200 COMM_Key

Schuylkill East Brunswick Township

South Schuylkill Comprehensive Park, Recreation, Open Space,

BRC-TAG-19-131

$50,000.00 $50,000.00 19 Comp. Rec., Park, & Open Space Plans (COMM)

$100,000.00 COMM_Key

Schuylkill East Brunswick Township

South Schuylkill Comprehensive Park, Recreation, Open Space,

BRC-TAG-19-131

$50,000.00 $50,000.00 19 Comp. Rec., Park, & Open Space Plans (COMM)

$100,000.00 COMM_Key

Schuylkill East Brunswick Township

South Schuylkill Comprehensive Park, Recreation, Open Space,

BRC-TAG-19-131

$50,000.00 $50,000.00 19 Comp. Rec., Park, & Open Space Plans (COMM)

$100,000.00 COMM_Key

Schuylkill East Brunswick Township

South Schuylkill Comprehensive Park, Recreation, Open Space,

BRC-TAG-19-131

$50,000.00 $50,000.00 19 Comp. Rec., Park, & Open Space Plans (COMM)

$100,000.00 COMM_Key

Schuylkill East  Brunswick  Township

Township  Park  -­‐  Development

BRC-­‐SC-­‐16-­‐41

$40,000 $40,000 16 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Schuylkill East Norwegian Township

Schoentown Sporting Complex – Development

BRC-SC-19-40

$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)

$60,000.00 COMM_Key

Schuylkill East Norwegian Township

Schoentown Sporting Complex – Development

BRC-SC-19-40

$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)

$60,000.00 COMM_Key

Page 485: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  485  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Schuylkill East Norwegian Township

Schoentown Sporting Complex – Development

BRC-SC-19-40

$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)

$60,000.00 COMM_Key

Schuylkill Eastern  Schuylkill  Recreation  Commission  

Peer-­‐to-­‐Peer BRC-­‐TAG-­‐6-­‐7

$7,500 $7,500 6 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$8,250 COMM_Key

Schuylkill Eastern  Schuylkill  Recreation  Commission  

Schuylkill  Valley  Heritage  Trail

BRC-­‐RTD-­‐6-­‐7

$160,000 $160,000 6 Rail  Rehabilitation  and  Development  (RT)

$320,000 RT_Key

Schuylkill Eastern  Schuylkill  Recreation  Commission  

West  Penn  Park  East  Master  Plan

KEY-­‐TAG-­‐5-­‐58

$12,500 $12,500 5 Master  Site  Plans  (COMM)

$25,000 COMM_Key

Schuylkill Foster  Township Community  Park KEY-­‐SC-­‐5-­‐67 $20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$22,000 COMM_Key

Schuylkill Foster  Township Community  Park  -­‐  Development

BRC-­‐SC-­‐17-­‐37

$40,000 $40,000 17 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Schuylkill Foster  Township Community  Park  Improvements

BRC-­‐SC-­‐7-­‐76

$40,000 $30,000 7 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Page 486: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  486  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Schuylkill Foster  Township Foster  Township  Community  Park  Enhancement

BRC-­‐SC-­‐12-­‐96

$40,000 $40,000 12 Small  Communities/Small  Projects  (COMM)

$80,200 COMM_Key

Schuylkill Foster  Township Hill  Area  Park BRC-­‐SC-­‐14-­‐86

$40,000 $40,000 14 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Schuylkill Frackville  Borough Arch  Street  Park BRC-­‐SC-­‐9-­‐79

$28,400 $28,000 9 Small  Communities/Small  Projects  (COMM)

$36,700 COMM_Key

Schuylkill Frackville  Borough Little  League  Park BRC-­‐SC-­‐14-­‐87

$23,000 $23,000 14 Small  Communities/Small  Projects  (COMM)

$26,000 COMM_Key

Schuylkill Frackville  Borough Little  League  Park  -­‐  Skateboard  Facility

BRC-­‐SC-­‐11-­‐124

$23,000 $23,000 11 Small  Communities/Small  Projects  (COMM)

$29,300 COMM_Key

Schuylkill Frackville  Borough Memorial  Park KEY-­‐PRD-­‐3-­‐69

$30,000 $30,000 3 Park  Rehabilitation  and  Development  (COMM)

$72,000 COMM_Key

Schuylkill Frailey  Township Frailey  Township  Park-­‐  Development

BRC-­‐SC-­‐18-­‐32

$40,000 $40,000 18 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Page 487: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  487  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Schuylkill Girardville  Borough East  End  Recreation  Area

KEY-­‐SC-­‐3-­‐73 $20,000 $20,000 3 Small  Communities/Small  Projects  (COMM)

$21,000 COMM_Key

Schuylkill Girardville  Borough West  End  Public  Rec.  Area  -­‐  Phase  III

BRC-­‐SC-­‐8-­‐77

$31,000 $31,000 8 Small  Communities/Small  Projects  (COMM)

$42,000 COMM_Key

Schuylkill Girardville  Borough West  End  Public  Recreation-­‐Phase  II

BRC-­‐SC-­‐7-­‐78

$30,000 $30,000 7 Small  Communities/Small  Projects  (COMM)

$40,000 COMM_Key

Schuylkill Girardville  Borough West  End  Recreation  Area  -­‐  Phase  I

BRC-­‐SC-­‐6-­‐73

$20,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$27,000 COMM_Key

Schuylkill Hawk  Mountain  Sanctuary  Association  

Bachkai  Parcel  Acquisition

BRC-­‐LTA-­‐13-­‐34

$35,000 $35,000 13 Critical  Habitat  Acquisition  (LT)

$70,000 LT_Key

Schuylkill Hawk  Mountain  Sanctuary  Association  

Hawk  Mountain  Resources  Inventory

KEY-­‐LTP-­‐2-­‐3 $44,650 $35,000 2 Critical  Habitat  Planning  (LT)

$70,000 LT_Key

Schuylkill Mahanoy  City  Borough

East  End  Park  Imporvements

BRC-­‐SC-­‐8-­‐111

$25,000 $25,000 8 Small  Communities/Small  Projects  (COMM)

$30,000 COMM_Key

Schuylkill Mahanoy  City  Borough

Fifth  &  Centre  Park KEY-­‐PRD-­‐2-­‐91

$10,000 $10,000 2 Park  Rehabilitation  and  Development  (COMM)

$20,000 COMM_Key

Page 488: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  488  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Schuylkill Mahanoy  City  Borough

North  8th  Street  Park  -­‐  Development

BRC-­‐SC-­‐17-­‐44

$31,000 $31,000 17 Small  Communities/Small  Projects  (COMM)

$42,000 COMM_Key

Schuylkill Mahanoy  Township Parente  Family  Park  -­‐  Development

BRC-­‐SC-­‐17-­‐45

$30,800 $31,000 17 Small  Communities/Small  Projects  (COMM)

$48,000 COMM_Key

Schuylkill Mechanicsville  Borough

Recreation  Area BRC-­‐SC-­‐10-­‐89

$40,000 $40,000 10 Small  Communities/Small  Projects  (COMM)

$74,900 COMM_Key

Schuylkill Middleport  Borough Community  Park KEY-­‐SC-­‐2-­‐99 $20,000 $20,000 2 Small  Communities/Small  Projects  (COMM)

$29,250 COMM_Key

Schuylkill Middleport  Borough Middleport  Playground-­‐Rehabilitation

BRC-­‐SC-­‐16-­‐4

$40,000 $40,000 16 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Schuylkill Minersville  Borough Delaware  Avenue  Complex

KEY-­‐PRD-­‐5-­‐132

$33,500 $33,500 5 Park  Rehabilitation  and  Development  (COMM)

$67,000 COMM_Key

Schuylkill Minersville  Borough Fourth  Street  Recreation  Park

KEY-­‐PRD-­‐2-­‐102

$30,000 $30,000 2 Park  Rehabilitation  and  Development  (COMM)

$65,000 COMM_Key

Page 489: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  489  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Schuylkill Minersville  Borough Minersville  Community  Swimming  Pool  Renovation

BRC-­‐PRD-­‐12-­‐173

$500,000 $400,000 12 Park  Rehabilitation  and  Development  (COMM)

$1,009,000 COMM_Key

Schuylkill Minersville  Borough Minersville  Pool  -­‐  Phase  2

BRC-­‐PRD-­‐13-­‐607

$200,000 $100,000 13 Park  Rehabilitation  and  Development  (COMM)

$554,700 COMM_Key

Schuylkill New  Ringgold  Borough

Playground BRC-­‐SC-­‐10-­‐91

$28,900 $28,000 10 Small  Communities/Small  Projects  (COMM)

$37,800 COMM_Key

Schuylkill Northern  Schuylkill  Council  of  Governments  

Northern  Schuylkill  Rails  to  Trails

BRC-­‐RTP-­‐7-­‐9

$10,000 $10,000 7 Feasibility  Studies  (RT)

$20,000 RT_Key

Schuylkill Palo  Alto  Borough Bacon  Street  Park BRC-­‐SC-­‐10-­‐93

$32,500 $40,000 10 Small  Communities/Small  Projects  (COMM)

$45,000 COMM_Key

Schuylkill Palo  Alto  Borough Bacon  Street  Park  Renovation  Project

BRC-­‐SC-­‐8-­‐143

$30,000 $30,000 8 Small  Communities/Small  Projects  (COMM)

$40,000 COMM_Key

Schuylkill Pine  Grove  Borough Borough  Park  Master  Site  Plan

BRC-­‐TAG-­‐16-­‐68

$10,000 $10,000 16 Master  Site  Plans  (COMM)

$20,000 COMM_Key

Schuylkill Pine Grove Township Pine Grove Township Recreation Area - Development

BRC-SC-19-47

$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)

$60,000.00 COMM_Key

Page 490: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  490  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Schuylkill Pine Grove Township Pine Grove Township Recreation Area - Development

BRC-SC-19-47

$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)

$60,000.00 COMM_Key

Schuylkill Pine Grove Township Pine Grove Township Recreation Area - Development

BRC-SC-19-47

$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)

$60,000.00 COMM_Key

Schuylkill Pine  Grove  Township

Recreation  Area BRC-­‐SC-­‐14-­‐102

$40,000 $40,000 14 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Schuylkill Port  Carbon  Borough

Francis  Lubinsky  Park-­‐  Phase  2-­‐  Development

BRC-­‐SC-­‐18-­‐38

$40,000 $40,000 18 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Schuylkill Port  Carbon  Borough

Mirawall  Playground BRC-­‐SC-­‐11-­‐150

$39,500 $40,000 11 Small  Communities/Small  Projects  (COMM)

$91,800 COMM_Key

Schuylkill Pottsville  City General  George  A.  Joulwan  (Eastside)  Park

BRC-­‐TAG-­‐6-­‐154

$7,500 $7,500 6 Master  Site  Plans  (COMM)

$15,000 COMM_Key

Schuylkill Pottsville  City JFK    Pool KEY-­‐PRD-­‐5-­‐168

$175,000 $150,000 5 Park  Rehabilitation  and  Development  (COMM)

$350,000 COMM_Key

Schuylkill Pottsville  City JFK  Pool  Feasibility  Study

KEY-­‐TAG-­‐3-­‐181

$2,500 $2,500 3 Feasibility  Studies  (COMM)

$5,000 COMM_Key

Page 491: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  491  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Schuylkill Pottsville  City Joulwan  Park BRC-­‐PRD-­‐11-­‐256

$307,800 $300,000 11 Park  Rehabilitation  and  Development  (COMM)

$615,600 COMM_Key

Schuylkill Pottsville  City Pottsville  Playgrounds

BRC-­‐PRD-­‐7-­‐159

$50,000 $50,000 7 Park  Rehabilitation  and  Development  (COMM)

$100,000 COMM_Key

Schuylkill Reilly  Township Branchdale  Park  -­‐  Development

BRC-­‐SC-­‐16-­‐47

$37,000 $37,000 16 Small  Communities/Small  Projects  (COMM)

$54,000 COMM_Key

Schuylkill Reilly Township Branchdale Park -Phase 2 - Development

BRC-SC-19-48

$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)

$60,000.00 COMM_Key

Schuylkill Reilly Township Branchdale Park -Phase 2 - Development

BRC-SC-19-48

$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)

$60,000.00 COMM_Key

Schuylkill Reilly Township Branchdale Park -Phase 2 - Development

BRC-SC-19-48

$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)

$60,000.00 COMM_Key

Schuylkill Reilly  Township Newtown  Recreation  Area

BRC-­‐SC-­‐6-­‐158

$20,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$24,900 COMM_Key

Page 492: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  492  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Schuylkill Rush  Township Miller  Estates  Park BRC-­‐SC-­‐6-­‐160

$20,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Schuylkill Rush Township Miller Park - Development

BRC-SC-19-50

$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)

$60,000.00 COMM_Key

Schuylkill Rush Township Miller Park - Development

BRC-SC-19-50

$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)

$60,000.00 COMM_Key

Schuylkill Rush Township Miller Park - Development

BRC-SC-19-50

$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)

$60,000.00 COMM_Key

Schuylkill Rush  Township Quakake  Playground  Renovation

BRC-­‐SC-­‐12-­‐119

$27,500 $27,500 12 Small  Communities/Small  Projects  (COMM)

$35,000 COMM_Key

Schuylkill Ryan  Township Township  Park KEY-­‐SC-­‐5-­‐174

$20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$28,446 COMM_Key

Schuylkill Schuylkill  County Rails-­‐to-­‐Trails  Special  Study/Greenway

KEY-­‐TAG-­‐2-­‐137

$25,000 $25,000 2 Greenway  Plans  (COMM)

$50,000 COMM_Key

Schuylkill Schuylkill  County Schuylkill  County  Comprehensive  Plan

BRC-­‐TAG-­‐8-­‐165

$116,600 $60,000 8 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$528,400 COMM_Key

Page 493: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  493  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Schuylkill Schuylkill  County Sweet  Arrow  Lake  County  Park  Development

BRC-­‐PRD-­‐12-­‐196

$857,500 $363,000 12 Park  Rehabilitation  and  Development  (COMM)

$1,715,000 COMM_Key

Schuylkill Schuylkill  County Sweet  Arrow  Lake,  Site  Master  Plan

BRC-­‐TAG-­‐8-­‐166

$41,000 $40,000 8 Master  Site  Plans  (COMM)

$82,000 COMM_Key

Schuylkill Schuylkill  Haven  Borough

Island  Park  -­‐Phase  I BRC-­‐PRD-­‐13.3-­‐426

$57,500 $57,500 13.3 Park  Rehabilitation  and  Development  (COMM)

$115,000 COMM_Key

Schuylkill Shenandoah  Borough

Bicentennial  Park BRC-­‐PRD-­‐6-­‐165

$40,000 $56,100 6 Park  Rehabilitation  and  Development  (COMM)

$112,200 COMM_Key

Schuylkill Shenandoah  Borough

Girard  Park KEY-­‐PRD-­‐3-­‐194

$20,000 $20,000 3 Park  Rehabilitation  and  Development  (COMM)

$40,000 COMM_Key

Schuylkill St.  Clair  Borough Middleward  Playground

KEY-­‐SC-­‐3-­‐206

$20,000 $20,000 3 Small  Communities/Small  Projects  (COMM)

$22,000 COMM_Key

Schuylkill St.  Clair  Borough North  Ward  Park KEY-­‐PRD-­‐5-­‐189

$75,000 $75,000 5 Park  Rehabilitation  and  Development  (COMM)

$150,000 COMM_Key

Page 494: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  494  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Schuylkill St.  Clair  Borough Third  Street  Park-­‐  Development

BRC-­‐SC-­‐18-­‐42

$40,000 $40,000 18 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Schuylkill Tamaqua  Borough Bungalow  Playground

BRC-­‐PRD-­‐11-­‐89

$50,000 $50,000 11 Park  Rehabilitation  and  Development  (COMM)

$100,000 COMM_Key

Schuylkill Tamaqua  Borough Circuit  Rider  -­‐  Year  1 KEY-­‐TAG-­‐2-­‐153

$25,000 $25,000 2 Circuit  Rider  (COMM)

$25,000 COMM_Key

Schuylkill Tamaqua  Borough Circuit  Rider  -­‐  Year  2 KEY-­‐TAG-­‐3-­‐217

$19,500 $19,500 3 Circuit  Rider  (COMM)

$26,000 COMM_Key

Schuylkill Tamaqua  Borough Dutch  Hill  Playground  -­‐  Development

BRC-­‐PRD-­‐17-­‐153

$28,000 $28,000 17 Park  Rehabilitation  and  Development  (COMM)

$56,000 COMM_Key

Schuylkill Tamaqua  Borough Feasibility  Study KEY-­‐RTP-­‐3-­‐22

$4,000 $4,000 3 Feasibility  Studies  (RT)

$8,000 RT_Key

Schuylkill Tamaqua  Borough Recreation  Improvements

BRC-­‐PRD-­‐7-­‐187

$60,000 $60,000 7 Park  Rehabilitation  and  Development  (COMM)

$120,000 COMM_Key

Schuylkill Walker  Township Wildcat  Park  Rehabilitation

BRC-­‐SC-­‐12-­‐126

$30,000 $30,000 12 Small  Communities/Small  Projects  (COMM)

$40,000 COMM_Key

Schuylkill Washington  Township

Schaeffer  Land  Acquisition

BRC-­‐ACQ-­‐13.3-­‐285

$67,400 $64,600 13.3 Acquisition  (COMM)

$134,800 COMM_Key

Page 495: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  495  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Schuylkill Washington  Township

Washington  Township  Recreation  Park  Master  Site  Plan

BRC-­‐TAG-­‐13.3-­‐498

$10,000 $10,000 13.3 Master  Site  Plans  (COMM)

$20,000 COMM_Key

Schuylkill West  Mahanoy  Township

Altamont  Playground KEY-­‐SC-­‐5-­‐225

$20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$25,000 COMM_Key

Schuylkill West  Penn  Township

West  Penn  Park KEY-­‐ACQ-­‐4-­‐171

$28,900 $28,000 4 Acquisition  (COMM)

$57,900 COMM_Key

Schuylkill West  Penn  Township

West  Penn  Park  East BRC-­‐PRD-­‐14-­‐182

$75,000 $75,000 14 Park  Rehabilitation  and  Development  (COMM)

$150,000 COMM_Key

Snyder Beavertown  Borough

Borough  Park BRC-­‐SC-­‐10-­‐64

$29,000 $30,000 10 Small  Communities/Small  Projects  (COMM)

$39,800 COMM_Key

Snyder Center  Township Keene  Community  Park

BRC-­‐TAG-­‐12.5-­‐27

$15,000 $15,000 12.5 Master  Site  Plans  (COMM)

$30,000 COMM_Key

Snyder Center  Township Keene  Community  Park  -­‐  Phase  I  -­‐Rehabilitation

BRC-­‐PRD-­‐15-­‐52

$100,000 $65,000 15 Park  Rehabilitation  and  Development  (COMM)

$200,000 COMM_Key

Snyder Freeburg  Borough Freeburg-­‐Washington  Community  Park

BRC-­‐SC-­‐9-­‐82

$35,200 $35,000 9 Small  Communities/Small  Projects  (COMM)

$50,400 COMM_Key

Page 496: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  496  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Snyder McClure  Borough McClure  Station  Park BRC-­‐SC-­‐9-­‐129

$35,000 $30,000 9 Small  Communities/Small  Projects  (COMM)

$50,000 COMM_Key

Snyder McClure  Borough Midd-­‐West  Recreation  Peer  Study

BRC-­‐TAG-­‐8-­‐9

$7,500 $7,500 8 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$8,250 COMM_Key

Snyder Middleburg  Borough Charles  Park  -­‐  Development

BRC-­‐SC-­‐17-­‐47

$40,000 $40,000 17 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Snyder Middleburg  Municipal  Authority  

Middleburg  Community  Swimming  Pool

BRC-­‐PRD-­‐10-­‐26

$325,000 $100,000 10 Park  Rehabilitation  and  Development  (COMM)

$650,000 COMM_Key

Snyder Middlecreek  Township

Middlecreek  Recreation  Area-­‐Development

BRC-­‐SC-­‐18-­‐36

$40,000 $40,000 18 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Snyder Monroe  Township Comprehensive  Recreation,  Park  &  Open  Space  Plan

BRC-­‐TAG-­‐11-­‐225

$42,150 $50,000 11 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$84,300 COMM_Key

Snyder Monroe  Township Recreation  Area BRC-­‐PRD-­‐13.3-­‐399

$217,300 $217,300 13.3 Park  Rehabilitation  and  Development  (COMM)

$434,600 COMM_Key

Page 497: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  497  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Snyder Penn  Township East  Snyder  Park-­‐  Phase  I

BRC-­‐PRD-­‐12-­‐182

$225,200 $160,000 12 Park  Rehabilitation  and  Development  (COMM)

$450,300 COMM_Key

Snyder Selinsgrove  Borough Community  Swimming  Pool

BRC-­‐PRD-­‐13.3-­‐609

$702,400 $250,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$1,404,900 COMM_Key

Snyder Selinsgrove  Borough Selinsgrove  Commons-­‐  Development

BRC-­‐PRD-­‐16-­‐158

$110,200 $110,200 16 Park  Rehabilitation  and  Development  (COMM)

$220,400 COMM_Key

Snyder Snyder  County Snyder  County  Trail  FS

BRC-­‐RTP-­‐10-­‐11

$23,800 $20,000 10 Feasibility  Studies  (RT)

$47,600 RT_Key

Snyder Spring  Township Township  Park KEY-­‐SC-­‐2-­‐147

$13,780 $13,700 2 Small  Communities/Small  Projects  (COMM)

$13,780 COMM_Key

Snyder West  Perry  Township

Richfield  Youth  Park KEY-­‐SC-­‐2-­‐175

$19,916 $19,900 2 Small  Communities/Small  Projects  (COMM)

$26,566 COMM_Key

Somerset Addison  Borough Toll  House  Park KEY-­‐SC-­‐4-­‐6 $20,000 $20,000 4 Small  Communities/Small  Projects  (COMM)

$59,000 COMM_Key

Page 498: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  498  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Somerset Benson  Borough Borough  Park  Renovation

BRC-­‐SC-­‐12-­‐82

$32,000 $32,000 12 Small  Communities/Small  Projects  (COMM)

$43,100 COMM_Key

Somerset Boswell  Borough Tot  Park KEY-­‐SC-­‐1-­‐14 $19,072 $19,100 1 Small  Communities/Small  Projects  (COMM)

$19,072 COMM_Key

Somerset Cambria  Somerset  Authority  

Que  Reservoir  Whitewater  Release

BRC-­‐PRD-­‐14-­‐120

$643,000 $524,000 14 Park  Rehabilitation  and  Development  (COMM)

$1,286,000 COMM_Key

Somerset Cambria  Somerset  Authority  

Que  Whitewater  Release  Project

BRC-­‐PRD-­‐10-­‐111

$340,000 $150,000 10 Park  Rehabilitation  and  Development  (COMM)

$680,000 COMM_Key

Somerset Central  City  Borough Central  City  Recreation  Park

KEY-­‐SC-­‐2-­‐26 $20,000 $20,000 2 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Somerset Conemaugh  Township

Greenhouse  Recreation  Park

BRC-­‐RCD-­‐7-­‐7

$220,000 $236,000 7 Development  (RIV)

$440,000 RIVER_Key

Somerset Conemaugh  Township

Stonycreek  Whitewater  Park

BRC-­‐PRD-­‐10-­‐199

$495,000 $245,000 10 Park  Rehabilitation  and  Development  (COMM)

$990,000 COMM_Key

Page 499: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  499  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Somerset Confluence  Borough Beggs  Park BRC-­‐SC-­‐8-­‐52

$20,000 $20,000 8 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Somerset Confluence  Borough Community  Center  Renovation

BRC-­‐SC-­‐12-­‐88

$39,700 $40,000 12 Small  Communities/Small  Projects  (COMM)

$59,400 COMM_Key

Somerset Hooversville  Borough

Hoover  Field  Park  Renovation

BRC-­‐SC-­‐12-­‐100

$40,000 $40,000 12 Small  Communities/Small  Projects  (COMM)

$63,500 COMM_Key

Somerset Indian  Lake  Borough Calendars  Run  Hiking  and  Biking  Trail

BRC-­‐PRD-­‐11-­‐45

$72,800 $72,800 11 Park  Rehabilitation  and  Development  (COMM)

$363,400 COMM_Key

Somerset Jenner  Township Comprehensive  Recreation,  Park  &  Open  Space  Plan

BRC-­‐TAG-­‐13-­‐187

$15,000 $15,000 13 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$30,000 COMM_Key

Somerset Ogle  Township Ogle  Community  Park

BRC-­‐SC-­‐11-­‐142

$40,000 $40,000 11 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Somerset Rockwood  Borough Rockwood  Community  Playground

BRC-­‐SC-­‐7-­‐166

$20,000 $20,000 7 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Page 500: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  500  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Somerset Salisbury  Borough Borough  Park KEY-­‐SC-­‐3-­‐189

$20,000 $20,000 3 Small  Communities/Small  Projects  (COMM)

$70,000 COMM_Key

Somerset Shade  Township Township  Park KEY-­‐SC-­‐4-­‐135

$20,000 $20,000 4 Small  Communities/Small  Projects  (COMM)

$28,000 COMM_Key

Somerset Somerset  Borough Union  Street  Playground

KEY-­‐PRD-­‐3-­‐197

$40,000 $40,000 3 Park  Rehabilitation  and  Development  (COMM)

$80,000 COMM_Key

Somerset Somerset  County Allegheny  Highlands  Trail

BRC-­‐RTD-­‐6-­‐18

$100,000 $100,000 6 Rail  Rehabilitation  and  Development  (RT)

$2,926,400 RT_Key

Somerset Somerset  County Allegheny  Highlands  Trail

BRC-­‐RTD-­‐7-­‐15

$140,000 $140,000 7 Rail  Rehabilitation  and  Development  (RT)

$758,750 RT_Key

Somerset Somerset  County Allegheny  Highlands  Trail

BRC-­‐RTD-­‐8-­‐15

$440,000 $440,000 8 Rail  Rehabilitation  and  Development  (RT)

$1,848,000 RT_Key

Page 501: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  501  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Somerset Somerset  County Allegheny  Highlands  Trail

KEY-­‐PRD-­‐2-­‐142

$105,000 $105,000 2 Park  Rehabilitation  and  Development  (COMM)

$1,528,400 COMM_Key

Somerset Somerset  County Allegheny  Highlands  Trail  -­‐  Casselman  River  Bridge

KEY-­‐RTD-­‐5-­‐16

$50,000 $50,000 5 Rail  Rehabilitation  and  Development  (RT)

$100,000 RT_Key

Somerset Somerset  County Allegheny  Highlands  Trail  Project

KEY-­‐RTD-­‐3-­‐21

$52,000 $52,000 3 Rail  Rehabilitation  and  Development  (RT)

$305,000 RT_Key

Somerset Somerset  County Allegheny  Trail  Alliance  Circuit  Rider  -­‐  Year  1

KEY-­‐TAG-­‐5-­‐186

$25,000 $25,000 5 Circuit  Rider  (COMM)

$88,963 COMM_Key

Somerset Somerset  County Great  Allegheny  Passage-­‐Garrett  Underpass

BRC-­‐PRD-­‐13-­‐431

$100,000 $400,000 13 Park  Rehabilitation  and  Development  (COMM)

$870,000 COMM_Key

Somerset Somerset  County Somerset  Lake  Park  Feasibility  Study/Site  Plan

BRC-­‐TAG-­‐10-­‐169

$30,000 $30,000 10 Feasibility  Studies  (COMM)

$60,000 COMM_Key

Somerset Somerset  County  Conservancy  

Florence  Property  Acquisition  -­‐  (Kimberly  Run  Natural  Area)

BRC-­‐LTA-­‐18-­‐17

$129,933 $118,700 18 Open  Space  Acquisition  (LT)

$259,866 LT_Key

Page 502: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  502  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Somerset Southern  Alleghenies  Conservancy  

Laurel  Hill  Creek BRC-­‐RCP-­‐7-­‐18

$110,000 $75,000 7 Planning  (RIV) $232,500 RIVER_Key

Somerset Stonycreek  Township

Shanksville-­‐Stonycreek  Recreation  Park

BRC-­‐SC-­‐12-­‐125

$40,000 $40,000 12 Small  Communities/Small  Projects  (COMM)

$56,700 COMM_Key

Somerset Stonycreek  Township

Shanksville-­‐Stonycreek  Recreational  Park

KEY-­‐SC-­‐5-­‐192

$20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$24,890 COMM_Key

Somerset Stoystown  Borough Quemahoning  Stoystown  Community  Park

BRC-­‐SC-­‐11-­‐159

$30,000 $30,000 11 Small  Communities/Small  Projects  (COMM)

$40,000 COMM_Key

Somerset Western  Pennsylvania  Conservancy  

Countryman  Tract  Acquisition

BRC-­‐LTA-­‐16-­‐39

$250,000 $250,000 16 Open  Space  Acquisition  (LT)

$680,000 LT_Key

Somerset Western Pennsylvania Conservancy

Weld Property Acquisition

BRC-LTA-19-31

$110,765.00 $110,000.00 19 Open Space Acquisition (LT)

$221,530.00 LT_Key

Somerset Western Pennsylvania Conservancy

Weld Property Acquisition

BRC-LTA-19-31

$110,765.00 $110,000.00 19 Open Space Acquisition (LT)

$221,530.00 LT_Key

Somerset Western Pennsylvania Conservancy

Weld Property Acquisition

BRC-LTA-19-31

$110,765.00 $110,000.00 19 Open Space Acquisition (LT)

$221,530.00 LT_Key

Somerset Windber  Borough Three  Sites BRC-­‐SC-­‐11-­‐166

$40,000 $40,000 11 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Page 503: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  503  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Somerset Windber  Borough Winber  Borough  Park

BRC-­‐SC-­‐7-­‐212

$40,000 $40,000 7 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Somerset Windber  Borough Windber  Recreation  Park  Site  Plan/Acquisition

BRC-­‐TAG-­‐12.5-­‐24

$25,000 $25,000 12.5 Master  Site  Plans  (COMM)

$50,000 COMM_Key

Statewide Pennsylvania Land Trust Association

Conservation Easement Assistance Program 2014

BRC-SR-19-182

$120,000.00 $75,000.00 19 Partnerships Projects

$240,000.00 LT_Key

Statewide Pennsylvania Land Trust Association

Education and Technical Assistance 2014

BRC-SR-19-183

$451,161.00 $80,000.00 19 Partnerships Projects

$874,734.00 LT_Key

Statewide Pennsylvania  Organization  for  Watersheds  and  Rivers,  Inc.  

PA  River  Sojourn  Grants

BRC-­‐RCI-­‐9-­‐15

$324,000 $386,000 9 Implementation  (RIV)

$772,000 RIVER_Key

Statewide Pennsylvania  Trout,  Inc.  

Coldwater  Heritage  Partnership  Program

BRC-­‐RCP-­‐8-­‐14

$204,000 $179,000 8 Coldwater  Heritage  Partnership

$416,750 RIVER_Key

Statewide Western Pennsylvania Conservancy

Building Partnerships for Vernal Pool Conservation 2014

BRC-SR-19-195

$73,000.00 $73,000.00 19 Partnerships Projects

$146,000.00 LT_Key

Sullivan Endless  Mountains  Resource  Conservation  Trust  

Muncy  Creek KEY-­‐CHP-­‐2-­‐3

$5,000 $5,000 5 Coldwater  Heritage  Partnership

$5,000 RIVER_Key

Sullivan Forksville  Borough Borough  Park KEY-­‐SC-­‐3-­‐67 $20,000 $20,000 3 Small  Communities/Small  Projects  (COMM)

$35,775 COMM_Key

Page 504: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  504  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Sullivan Forksville  Borough Playground/Recreation  Area

KEY-­‐ACQ-­‐1-­‐50

$12,500 $8,000 1 Acquisition  (COMM)

$25,000 COMM_Key

Sullivan Laporte  Borough Laporte  Park KEY-­‐SC-­‐1-­‐71 $20,000 $20,000 1 Small  Communities/Small  Projects  (COMM)

$28,920 COMM_Key

Sullivan Northcentral  Pennsylvania  Conservancy  

Conklin  Run  Tract  Acquisition

BRC-­‐LTA-­‐8-­‐12

$375,000 $375,000 8 Open  Space  Acquisition  (LT)

$750,000 LT_Key

Sullivan,  Susquehanna,  Tioga,  Wyoming

Wyoming  County Multi-­‐County  Open  Space  &  Greenway  Plan

BRC-­‐TAG-­‐13-­‐212

$100,000 $100,000 13 Greenway  Plans  (COMM)

$200,000 COMM_Key

Susquehanna Brooklyn  Township Community  Park KEY-­‐SC-­‐4-­‐19 $20,000 $20,000 4 Small  Communities/Small  Projects  (COMM)

$25,049 COMM_Key

Susquehanna Clifford  Township Clifford  Recreational  Complex

BRC-­‐SC-­‐10-­‐71

$40,000 $40,000 10 Small  Communities/Small  Projects  (COMM)

$109,760 COMM_Key

Susquehanna Edward  L.  Rose  Conservancy,  Inc.  

Feldstein  Property BRC-­‐LTA-­‐6-­‐9

$110,000 $100,000 6 Open  Space  Acquisition  (LT)

$220,000 LT_Key

Susquehanna Forest  City  Borough Babe  Ruth  Field KEY-­‐SC-­‐1-­‐49 $19,090 $19,000 1 Small  Communities/Small  Projects  (COMM)

$19,340 COMM_Key

Page 505: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  505  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Susquehanna Forest  City  Borough Kennedy  Park BRC-­‐SC-­‐13.3-­‐301

$20,000 $24,000 13.3 Small  Communities/Small  Projects  (COMM)

$28,800 COMM_Key

Susquehanna Forest  City  Borough Kennedy  Park BRC-­‐SC-­‐6-­‐66

$20,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$25,000 COMM_Key

Susquehanna Forest  City  Borough Kennedy  Park  Baseball  Field

BRC-­‐SC-­‐7-­‐75

$20,000 $20,000 7 Small  Communities/Small  Projects  (COMM)

$25,405 COMM_Key

Susquehanna Forest  Lake  Township

Charles  E.  Small  Park  Renovation

BRC-­‐SC-­‐12-­‐95

$29,400 $29,400 12 Small  Communities/Small  Projects  (COMM)

$38,800 COMM_Key

Susquehanna Friends  of  Salt  Springs  Park,  Inc.  

Fogler  Property  Acquisition

BRC-­‐LTA-­‐11-­‐11

$90,000 $90,000 11 Open  Space  Acquisition  (LT)

$180,000 LT_Key

Susquehanna Friends  of  Salt  Springs  Park,  Inc.  

Forrest  Property  Acquisition

BRC-­‐ACQ-­‐8-­‐74

$26,000 $9,500 8 Acquisition  (COMM)

$52,000 COMM_Key

Susquehanna Herrick  Township Community  Park BRC-­‐SC-­‐9-­‐92

$29,000 $29,000 9 Small  Communities/Small  Projects  (COMM)

$38,000 COMM_Key

Susquehanna Hop  Bottom  Borough

Mary  Karhnak  Memorial  Park

KEY-­‐SC-­‐2-­‐62 $14,012 $14,000 2 Small  Communities/Small  Projects  (COMM)

$17,492 COMM_Key

Page 506: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  506  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Susquehanna Montrose  Borough Memorial  Park BRC-­‐SC-­‐6-­‐119

$20,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$28,000 COMM_Key

Susquehanna New  Milford  Borough

Blue  Ridge  Park BRC-­‐SC-­‐6-­‐124

$20,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$24,400 COMM_Key

Susquehanna New  Milford  Borough

Blue  Ridge  Park-­‐Rehabilitation

BRC-­‐PRD-­‐15-­‐63

$160,000 $80,000 15 Park  Rehabilitation  and  Development  (COMM)

$538,345 COMM_Key

Susquehanna Oakland  Borough Oakland  Borough  Park  Rehabilitation

BRC-­‐SC-­‐12-­‐111

$32,000 $32,000 12 Small  Communities/Small  Projects  (COMM)

$44,000 COMM_Key

Susquehanna Rail-­‐Trail  Council  of  Northeastern  Pennsylvania,  Inc.  

D  &  H  Rail  Trail BRC-­‐RTD-­‐7-­‐13

$24,300 $152,800 7 Rail  Rehabilitation  and  Development  (RT)

$305,600 RT_Key

Susquehanna Rail-­‐Trail  Council  of  Northeastern  Pennsylvania,  Inc.  

Endless  Mountains  Rail-­‐Trail  Feasibility  Study

BRC-­‐RTP-­‐14-­‐282

$25,000 $25,000 14 Feasibility  Studies  (RT)

$50,000 RT_Key

Susquehanna Rail-­‐Trail  Council  of  Northeastern  Pennsylvania,  Inc.  

Forest  City  Trailhead  Plan

KEY-­‐RTP-­‐4-­‐17

$4,000 $4,000 4 Master  Plans  (RT)

$8,000 RT_Key

Page 507: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  507  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Susquehanna Susquehanna  County

Peer-­‐to-­‐Peer KEY-­‐TAG-­‐3-­‐212

$7,500 $7,500 3 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$8,250 COMM_Key

Susquehanna Susquehanna  County

Wheaton  House  -­‐  Phase  I

KEY-­‐PRD-­‐3-­‐211

$20,000 $20,000 3 Park  Rehabilitation  and  Development  (COMM)

$40,000 COMM_Key

Susquehanna Susquehanna  Depot  Borough

Frank  J.  Reddon  Sports  Complex

KEY-­‐SC-­‐3-­‐213

$10,500 $10,500 3 Small  Communities/Small  Projects  (COMM)

$11,500 COMM_Key

Susquehanna Susquehanna  Depot  Borough

Prospect  Street  Park KEY-­‐SC-­‐1-­‐133

$18,850 $18,800 1 Small  Communities/Small  Projects  (COMM)

$20,050 COMM_Key

Susquehanna Trails  Conservation  Corporation  

Rail  Trail  of  Northeastern  Pa.

KEY-­‐RTA-­‐95-­‐27

$20,300 $20,300 1 Acquisition  (RT) $40,600 RT_Key

Susquehanna Trails  Conservation  Corporation  

River  Cons.  Plan-­‐Upper  Lackawanna  Rvr.  W

KEY-­‐RCP-­‐96-­‐13

$40,000 $40,000 3 Planning  (RIV) $80,000 RIVER_Key

Tioga Blossburg  Borough Island  Park BRC-­‐SC-­‐14-­‐75

$40,000 $40,000 14 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Tioga Blossburg  Borough Island  Park  Pool KEY-­‐PRD-­‐1-­‐12

$26,000 $26,000 1 Park  Rehabilitation  and  Development  (COMM)

$52,000 COMM_Key

Page 508: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  508  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Tioga Elkland  Borough Feasibility  Study KEY-­‐TAG-­‐1-­‐46

$2,500 $2,500 1 Feasibility  Studies  (COMM)

$5,000 COMM_Key

Tioga Elkland  Borough Jerome  Park KEY-­‐SC-­‐3-­‐59 $20,000 $20,000 3 Small  Communities/Small  Projects  (COMM)

$27,000 COMM_Key

Tioga Hamilton  Township Township  Park  (aka-­‐  Hope  Park)-­‐  Development

BRC-­‐SC-­‐16-­‐42

$40,000 $40,000 16 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Tioga Jackson  Township Howser  Park KEY-­‐SC-­‐2-­‐67 $20,000 $20,000 2 Small  Communities/Small  Projects  (COMM)

$26,000 COMM_Key

Tioga Lawrenceville  Borough

Cherry  Street  Park-­‐  Development

BRC-­‐SC-­‐16-­‐45

$40,000 $40,000 16 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Tioga Liberty  Township Peer-­‐to-­‐Peer KEY-­‐TAG-­‐6-­‐1

$7,500 $7,500 6 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$8,250 COMM_Key

Tioga Mansfield  Borough Mansfield  Recreation  Center

BRC-­‐PRD-­‐14-­‐153

$108,727 $108,700 14 Park  Rehabilitation  and  Development  (COMM)

$217,455 COMM_Key

Page 509: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  509  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Tioga Mansfield  Borough Memorial  Swimming  Pool

KEY-­‐PRD-­‐5-­‐122

$300,000 $150,000 5 Park  Rehabilitation  and  Development  (COMM)

$1,145,450 COMM_Key

Tioga Mansfield  Borough Swimming  Pool  Feasibility  Study

KEY-­‐TAG-­‐2-­‐93

$5,750 $5,700 2 Feasibility  Studies  (COMM)

$11,500 COMM_Key

Tioga Northern  Tier  Recreation  Authority  

Baker  Memorial  Park BRC-­‐PRD-­‐11-­‐62

$59,600 $50,000 11 Park  Rehabilitation  and  Development  (COMM)

$119,100 COMM_Key

Tioga Northern  Tier  Recreation  Authority  

Gertrude  Case  Community  Playground

KEY-­‐SC-­‐4-­‐117

$20,000 $20,000 4 Small  Communities/Small  Projects  (COMM)

$25,000 COMM_Key

Tioga Sullivan  Township Annette  Smith  Memorial  Park

BRC-­‐SC-­‐14-­‐106

$31,600 $31,600 14 Small  Communities/Small  Projects  (COMM)

$43,100 COMM_Key

Tioga Tioga  Borough Lower  Tioga  Valley  Regional  Pool

BRC-­‐PRD-­‐11-­‐90

$205,000 $205,000 11 Park  Rehabilitation  and  Development  (COMM)

$410,000 COMM_Key

Tioga Tioga  Borough Tioga  Community  Pool  Feasibility  Study

BRC-­‐TAG-­‐7-­‐189

$7,050 $7,000 7 Feasibility  Studies  (COMM)

$14,100 COMM_Key

Page 510: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  510  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Tioga Wellsboro  Borough Hamilton  Lake  Boat  Launch

BRC-­‐PRD-­‐13-­‐154

$106,600 $106,000 13 Park  Rehabilitation  and  Development  (COMM)

$220,000 COMM_Key

Tioga Wellsboro Borough Woodland Park Master Plan

BRC-TAG-19-148

$24,435.00 $24,400.00 19 Master Site Plans (COMM)

$48,870.00 COMM_Key

Tioga Wellsboro Borough Woodland Park Master Plan

BRC-TAG-19-148

$24,435.00 $24,400.00 19 Master Site Plans (COMM)

$48,870.00 COMM_Key

Tioga Wellsboro Borough Woodland Park Master Plan

BRC-TAG-19-148

$24,435.00 $24,400.00 19 Master Site Plans (COMM)

$48,870.00 COMM_Key

Union Buffalo Valley Recreation Authority

Buffalo Valley Rail Trail – Lewisburg Extension – Development

BRC-PRD-19-91

$488,000.00 $488,000.00 19 Park Rehabilitation and Development (COMM)

$1,000,000.00 COMM_Key

Union Buffalo Valley Recreation Authority

Buffalo Valley Rail Trail – Lewisburg Extension – Development

BRC-PRD-19-91

$488,000.00 $488,000.00 19 Park Rehabilitation and Development (COMM)

$1,000,000.00 COMM_Key

Union Buffalo Valley Recreation Authority

Buffalo Valley Rail Trail – Lewisburg Extension – Development

BRC-PRD-19-91

$488,000.00 $488,000.00 19 Park Rehabilitation and Development (COMM)

$1,000,000.00 COMM_Key

Union East  Buffalo  Township

Lewisburg  Area  Recreation  Circuit  Rider-­‐  Year  1

KEY-­‐TAG-­‐5-­‐52

$35,000 $94,100 5 Circuit  Rider  (COMM)

$35,000 COMM_Key

Union Hartleton  Borough Community  Park BRC-­‐SC-­‐13-­‐303

$20,000 $20,000 13 Small  Communities/Small  Projects  (COMM)

$25,000 COMM_Key

Page 511: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  511  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Union Hartleton  Borough Hartleton  Park BRC-­‐SC-­‐6-­‐79

$20,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$24,000 COMM_Key

Union Hartley  Township Laurel  Run  Activity  Park

BRC-­‐TAG-­‐7-­‐83

$15,000 $15,000 7 Feasibility  Studies  (COMM)

$30,000 COMM_Key

Union Hartley  Township Laurelton  Recreation  Park

KEY-­‐SC-­‐5-­‐83 $20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$30,154 COMM_Key

Union Lewis  Township Ball  Field  Rehab BRC-­‐SC-­‐11-­‐134

$40,000 $40,000 11 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Union Lewisburg  Area  Recreation  Authority  

Community  Pool  Bathhouse

KEY-­‐PRD-­‐1-­‐72

$30,000 $30,000 1 Park  Rehabilitation  and  Development  (COMM)

$62,000 COMM_Key

Union Lewisburg  Area  Recreation  Authority  

Comp.  Rec,  Park  and  Open  Space  Plan

BRC-­‐TAG-­‐8-­‐104

$20,000 $20,000 8 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$40,000 COMM_Key

Union Lewisburg  Area  Recreation  Authority  

LARA  Peer  to  Peer BRC-­‐TAG-­‐18-­‐1

$10,000 $10,000 18 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$11,000 COMM_Key

Page 512: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  512  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Union Lewisburg  Area  Recreation  Authority  

Lewisburg  Area  Recreation  Park

BRC-­‐PRD-­‐11-­‐50

$500,000 $500,000 11 Park  Rehabilitation  and  Development  (COMM)

$2,313,500 COMM_Key

Union Lewisburg  Area  Recreation  Authority  

Lewisburg  Area  Recreation  Park  -­‐  West  End

BRC-­‐PRD-­‐13-­‐116

$300,000 $300,000 13 Park  Rehabilitation  and  Development  (COMM)

$650,000 COMM_Key

Union New  Berlin  Borough Gateway  to  the  Commons  Acquisition  (Wagner  Parcel)

BRC-­‐ACQ-­‐14-­‐64

$15,900 $10,000 14 Acquisition  (COMM)

$31,800 COMM_Key

Union New  Berlin  Borough Multi-­‐Purpose  Park BRC-­‐PRD-­‐6-­‐122

$41,750 $41,700 6 Park  Rehabilitation  and  Development  (COMM)

$83,500 COMM_Key

Union New  Berlin  Borough Multi-­‐Purpose  Park KEY-­‐ACQ-­‐3-­‐150

$29,200 $29,200 3 Acquisition  (COMM)

$58,500 COMM_Key

Union SEDA-­‐Council  of  Governments  

Community  River  Sports  Park  Feasibility  Study

BRC-­‐TAG-­‐13.3-­‐491

$20,000 $20,000 13.3 Feasibility  Studies  (COMM)

$50,000 COMM_Key

Union Union  County Buffalo  Valley  Trail BRC-­‐RTP-­‐8-­‐17

$26,900 $26,000 8 Feasibility  Studies  (RT)

$53,700 RT_Key

Union Union County Greenway and Open Space Plan

BRC-TAG-19-145

$26,000.00 $26,000.00 19 Comp. Rec., Park, & Open Space Plans (COMM)

$52,000.00 COMM_Key

Page 513: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  513  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Union Union County Greenway and Open Space Plan

BRC-TAG-19-145

$26,000.00 $26,000.00 19 Comp. Rec., Park, & Open Space Plans (COMM)

$52,000.00 COMM_Key

Union Union County Greenway and Open Space Plan

BRC-TAG-19-145

$26,000.00 $26,000.00 19 Comp. Rec., Park, & Open Space Plans (COMM)

$52,000.00 COMM_Key

Union Union  County Peer-­‐to-­‐Peer KEY-­‐TAG-­‐3-­‐222

$6,750 $6,750 3 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$7,500 COMM_Key

Venango Allegheny  Valley  Trails  Association  

Allegheny  River  Trail BRC-­‐RTA-­‐6-­‐25

$90,000 $90,000 6 Acquisition  (RT) $400,000 RT_Key

Venango Allegheny  Valley  Trails  Association  

Allegheny  River  Trail  -­‐  Rockland  to  Emlenton;  Refinery  Spur  &  Boat  Launch;  Foxburg  to  Parker

BRC-­‐RTD-­‐10-­‐4

$100,000 $100,000 10 Rail  Rehabilitation  and  Development  (RT)

$900,000 RT_Key

Venango Allegheny  Valley  Trails  Association  

Deep  Valley  Tunnel  Engineering

BRC-­‐RTD-­‐6-­‐2

$100,000 $250,000 6 Rail  Rehabilitation  and  Development  (RT)

$601,500 RT_Key

Venango Allegheny  Valley  Trails  Association  

Sandy  Creek  Trail BRC-­‐RTD-­‐11-­‐1

$200,000 $314,000 11 Rail  Rehabilitation  and  Development  (RT)

$400,000 RT_Key

Page 514: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  514  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Venango Barkeyville  Borough Community  Park BRC-­‐SC-­‐9-­‐14

$10,900 $20,000 9 Small  Communities/Small  Projects  (COMM)

$24,300 COMM_Key

Venango Barkeyville  Borough Community  Park KEY-­‐ACQ-­‐1-­‐8

$7,850 $7,900 1 Acquisition  (COMM)

$22,500 COMM_Key

Venango Barkeyville  Borough Community  Park KEY-­‐SC-­‐5-­‐13 $20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$22,000 COMM_Key

Venango Cherrytree  Township Township  Park  -­‐  Pavilion  #1

BRC-­‐SC-­‐10-­‐69

$20,000 $20,000 10 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Venango Clintonville  Borough Clintonville  Playground

BRC-­‐SC-­‐10-­‐197

$20,000 $20,000 10 Small  Communities/Small  Projects  (COMM)

$25,800 COMM_Key

Venango Conneaut  Lake-­‐French  Creek  Valley  Conservancy  

Sugarcreek  Station  Riparian  Area

BRC-­‐LTA-­‐6-­‐25

$90,000 $60,000 6 Open  Space  Acquisition  (LT)

$279,600 LT_Key

Venango Conneaut  Lake-­‐French  Creek  Valley  Conservancy  

Vaszil  Property  Acquisition

BRC-­‐RCA-­‐11-­‐7

$162,000 $151,000 11 Acquisition  (RIV)

$347,000 RIVER_Key

Venango Cranberry  Township Lower  Two  Mile  Run  Campsite

KEY-­‐PRD-­‐1-­‐35

$25,530 $25,500 1 Park  Rehabilitation  and  Development  (COMM)

$55,050 COMM_Key

Page 515: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  515  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Venango Cranberry  Township Visitor  Center KEY-­‐RTD-­‐95-­‐9

$22,500 $22,500 1 Rail  Rehabilitation  and  Development  (RT)

$46,000 RT_Key

Venango Emlenton  Borough Veteran's  Memorial  and  Borough  Parks

BRC-­‐SC-­‐7-­‐67

$40,000 $40,000 7 Small  Communities/Small  Projects  (COMM)

$69,837 COMM_Key

Venango Franklin  City Miller-­‐Sibley  Pool  -­‐  Development

BRC-­‐PRD-­‐17-­‐121

$40,000 $40,000 17 Park  Rehabilitation  and  Development  (COMM)

$80,000 COMM_Key

Venango Franklin  City Miller-­‐Sibley  Recreational  Complex

KEY-­‐PRD-­‐4-­‐61

$43,100 $43,100 4 Park  Rehabilitation  and  Development  (COMM)

$88,100 COMM_Key

Venango Franklin  City Riverfront  Park  Bike  Trail  Rehabilitation  Project

BRC-­‐PRD-­‐17-­‐120

$11,315 $11,300 17 Park  Rehabilitation  and  Development  (COMM)

$20,835 COMM_Key

Venango Oil  City Community  Gateway  Project

KEY-­‐PRD-­‐4-­‐118

$7,900 $7,900 4 Park  Rehabilitation  and  Development  (COMM)

$15,800 COMM_Key

Page 516: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  516  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Venango Oil  City Comp.  Plan  and  Swimming  Pool  Feasibility  Study

KEY-­‐TAG-­‐4-­‐119

$15,000 $15,000 4 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$30,000 COMM_Key

Venango Oil  City Comprehensive  Waterways  Plan

BRC-­‐RCI-­‐13.6-­‐560

$37,500 $37,500 13.6 Implementation  (RIV)

$75,000 RIVER_Key

Venango Oil  City Hasson  Park KEY-­‐PRD-­‐3-­‐160

$70,000 $100,000 3 Park  Rehabilitation  and  Development  (COMM)

$140,000 COMM_Key

Venango Oil City Oil City Marina Master Site Plan

BRC-TAG-19-140

$13,073.00 $13,000.00 19 Master Site Plans (COMM)

$26,146.00 COMM_Key

Venango Oil City Oil City Marina Master Site Plan

BRC-TAG-19-140

$13,073.00 $13,000.00 19 Master Site Plans (COMM)

$26,146.00 COMM_Key

Venango Oil City Oil City Marina Master Site Plan

BRC-TAG-19-140

$13,073.00 $13,000.00 19 Master Site Plans (COMM)

$26,146.00 COMM_Key

Venango Oil  City Pedestrian  Walkway  Replacement

BRC-­‐PRD-­‐17-­‐144

$60,000 $60,000 17 Park  Rehabilitation  and  Development  (COMM)

$120,700 COMM_Key

Venango Oil  Region  Alliance  of  Business,  Industry  &  Tourism  

Oil  Creek  Memorial  Landing  -­‐  Construction

BRC-­‐RCD-­‐17-­‐169

$97,000 $83,000 17 Development  (RIV)

$194,000 RIVER_Key

Venango Plum  Township Cooper  Park BRC-­‐SC-­‐11-­‐148

$20,000 $28,300 11 Small  Communities/Small  Projects  (COMM)

$38,300 COMM_Key

Page 517: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  517  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Venango Plum  Township Cooper  Park KEY-­‐SC-­‐1-­‐111

$14,785 $14,800 1 Small  Communities/Small  Projects  (COMM)

$14,785 COMM_Key

Venango Sandycreek  Township

Robert  Mason  Brown  Park  &  West  View  Playground

BRC-­‐SC-­‐12-­‐121

$40,000 $40,000 12 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Venango Venango  County Recreation,  Parks  and  Open  Space  in  Venango  County

BRC-­‐TAG-­‐12.5-­‐23

$55,000 $55,000 12.5 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$110,000 COMM_Key

Venango Venango  County Two  Mile  Run  Park KEY-­‐PRD-­‐4-­‐160

$60,000 $30,000 4 Park  Rehabilitation  and  Development  (COMM)

$120,000 COMM_Key

Venango Venango  County Two  Mile  Run  Park  Master  Plan

KEY-­‐TAG-­‐4-­‐159

$45,000 $40,000 4 Master  Site  Plans  (COMM)

$90,000 COMM_Key

Venango Venango  County Two  Mile  Run  Park-­‐  Development

BRC-­‐PRD-­‐16-­‐165

$79,945 $100,000 16 Park  Rehabilitation  and  Development  (COMM)

$184,345 COMM_Key

Venango Western  Pennsylvania  Conservancy  

Cornuet  Acquisition  (Eastern  Massasauga  Habitat)

BRC-­‐LTA-­‐18-­‐19

$40,950 $40,900 18 Open  Space  Acquisition  (LT)

$81,901 LT_Key

Page 518: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  518  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Venango Western  Pennsylvania  Conservancy  

Firth  Property  Easement

BRC-­‐LTA-­‐15-­‐124

$159,225 $159,000 15 Critical  Habitat  Acquisition  (LT)

$318,450 LT_Key

Warren Clarendon  Borough Allegheny  Valley  Playground

KEY-­‐SC-­‐4-­‐29 $20,000 $20,000 4 Small  Communities/Small  Projects  (COMM)

$22,000 COMM_Key

Warren Columbus  Township Mather  Park BRC-­‐SC-­‐7-­‐43

$21,250 $21,000 7 Small  Communities/Small  Projects  (COMM)

$22,500 COMM_Key

Warren Elk  Township Playground  Upgrade BRC-­‐SC-­‐11-­‐119

$29,900 $30,000 11 Small  Communities/Small  Projects  (COMM)

$39,800 COMM_Key

Warren Elk  Township Township  Park BRC-­‐SC-­‐14-­‐82

$20,000 $20,000 14 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Warren Pine  Grove  Township

Werner  Park BRC-­‐SC-­‐6-­‐148

$20,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Warren Sheffield  Township Sheffield  Memorial  Park

BRC-­‐SC-­‐7-­‐173

$20,000 $33,000 7 Small  Communities/Small  Projects  (COMM)

$55,281 COMM_Key

Page 519: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  519  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Warren Sheffield  Township Sports  Complex BRC-­‐PRD-­‐12-­‐291

$106,000 $100,000 12 Park  Rehabilitation  and  Development  (COMM)

$212,000 COMM_Key

Warren Sheffield  Township Township  Park KEY-­‐SC-­‐2-­‐138

$16,800 $16,800 2 Small  Communities/Small  Projects  (COMM)

$21,300 COMM_Key

Warren Warren  City Beaty  Park BRC-­‐PRD-­‐13-­‐153

$80,000 $80,000 13 Park  Rehabilitation  and  Development  (COMM)

$160,000 COMM_Key

Warren Warren  City Beaty  Park BRC-­‐PRD-­‐13.3-­‐441

$87,500 $87,500 13.3 Park  Rehabilitation  and  Development  (COMM)

$175,000 COMM_Key

Warren Warren  City Beaty  Park-­‐Phase  3  -­‐  Development

BRC-­‐PRD-­‐17-­‐159

$76,913 $100,000 17 Park  Rehabilitation  and  Development  (COMM)

$153,826 COMM_Key

Warren Warren  City DeFrees  Park KEY-­‐PRD-­‐5-­‐211

$45,000 $45,000 5 Park  Rehabilitation  and  Development  (COMM)

$90,000 COMM_Key

Page 520: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  520  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Warren Warren City Municipal Swimming Pool - Development

BRC-PRD-19-123

$98,545.00 $98,500.00 19 Park Rehabilitation and Development (COMM)

$197,090.00 COMM_Key

Warren Warren City Municipal Swimming Pool - Development

BRC-PRD-19-123

$98,545.00 $98,500.00 19 Park Rehabilitation and Development (COMM)

$197,090.00 COMM_Key

Warren Warren City Municipal Swimming Pool - Development

BRC-PRD-19-123

$98,545.00 $98,500.00 19 Park Rehabilitation and Development (COMM)

$197,090.00 COMM_Key

Warren Warren  City Point  Park  Pool  Feasibility  Study

KEY-­‐TAG-­‐4-­‐164

$10,000 $10,000 4 Feasibility  Studies  (COMM)

$20,000 COMM_Key

Warren Warren  City Point  Park,  C.A.R.  Pool

BRC-­‐PRD-­‐6-­‐188

$275,000 $275,000 6 Park  Rehabilitation  and  Development  (COMM)

$550,000 COMM_Key

Warren Warren  County Warren  Bike/Hike  Trail

KEY-­‐RTP-­‐5-­‐19

$24,250 $24,200 5 Feasibility  Studies  (RT)

$129,250 RT_Key

Warren Warren  County Warren/North  Warren  Bike/Hike  Trail  Extension

BRC-­‐PRD-­‐12-­‐214

$172,200 $172,000 12 Park  Rehabilitation  and  Development  (COMM)

$618,700 COMM_Key

Page 521: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  521  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Washington Bentleyville  Borough Richardson  Park BRC-­‐SC-­‐8-­‐23

$20,000 $20,000 8 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Washington Bentleyville  Borough Richardson  Park KEY-­‐SC-­‐3-­‐17 $6,500 $6,500 3 Small  Communities/Small  Projects  (COMM)

$9,000 COMM_Key

Washington Bentleyville  Borough Richardson  Park  -­‐  Phase  II

BRC-­‐SC-­‐10-­‐65

$20,000 $20,000 10 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Washington Burgettstown  Borough

Raccoon  Valley  Park BRC-­‐SC-­‐9-­‐37

$48,700 $40,000 9 Small  Communities/Small  Projects  (COMM)

$77,544 COMM_Key

Washington California Borough Union Street Wharf Development

BRC-RCD-19-155

$75,000.00 $75,000.00 19 Development (RIV)

$153,736.00 COMM_Key

Washington California Borough Union Street Wharf Development

BRC-RCD-19-155

$75,000.00 $75,000.00 19 Development (RIV)

$153,736.00 COMM_Key

Washington California Borough Union Street Wharf Development

BRC-RCD-19-155

$75,000.00 $75,000.00 19 Development (RIV)

$153,736.00 COMM_Key

Washington Canonsburg  Borough Town  Park KEY-­‐PRD-­‐1-­‐29

$20,749 $20,700 1 Park  Rehabilitation  and  Development  (COMM)

$41,499 COMM_Key

Washington Canonsburg  Borough Town  Park  Master  Plan

BRC-­‐TAG-­‐12-­‐227

$27,000 $27,000 12 Master  Site  Plans  (COMM)

$54,000 COMM_Key

Page 522: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  522  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Washington Canonsburg  Borough Town  Park  Pool BRC-­‐PRD-­‐14-­‐121

$300,000 $300,000 14 Park  Rehabilitation  and  Development  (COMM)

$625,400 COMM_Key

Washington Canton  Township Canton  Park/York  Property  Acquisition

BRC-­‐ACQ-­‐7-­‐34

$45,050 $45,000 7 Acquisition  (COMM)

$90,100 COMM_Key

Washington Canton  Township Upper  Chartiers  Creek  Greenway  &  Trail  Plan

BRC-­‐RCI-­‐9-­‐4 $14,600 $14,600 9 Implementation  (RIV)

$29,200 RIVER_Key

Washington Cecil  Township Dick  Corporation  Acquisition

BRC-­‐ACQ-­‐15-­‐42

$210,200 $210,000 15 Acquisition  (COMM)

$420,400 COMM_Key

Washington Centerville  Borough Centerville  Park BRC-­‐SC-­‐6-­‐32

$20,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$32,979 COMM_Key

Washington Centerville  Borough Mexico/Vestaburg  Park

BRC-­‐SC-­‐8-­‐36

$20,000 $20,000 8 Small  Communities/Small  Projects  (COMM)

$26,100 COMM_Key

Washington Charleroi  Borough Four  Sites KEY-­‐PRD-­‐5-­‐33

$33,400 $33,000 5 Park  Rehabilitation  and  Development  (COMM)

$96,000 COMM_Key

Washington Chartiers  Township Community  Park BRC-­‐PRD-­‐6-­‐36

$150,000 $125,000 6 Park  Rehabilitation  and  Development  (COMM)

$300,000 COMM_Key

Page 523: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  523  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Washington Claysville  Borough McGuffey  Park BRC-­‐SC-­‐6-­‐41

$19,100 $20,000 6 Small  Communities/Small  Projects  (COMM)

$19,100 COMM_Key

Washington Coal  Center  Borough Riverfront  Park  Improvements

BRC-­‐SC-­‐12-­‐87

$40,000 $40,000 12 Small  Communities/Small  Projects  (COMM)

$65,000 COMM_Key

Washington Cross  Creek  Township

Cedar  Grove  Park  -­‐  Phase  2-­‐  Development

BRC-­‐PRD-­‐18-­‐61

$180,200 $91,200 18 Park  Rehabilitation  and  Development  (COMM)

$360,400 COMM_Key

Washington Donora  Borough Donora  Garden  Project

KEY-­‐PRD-­‐5-­‐48

$9,837 $10,000 5 Park  Rehabilitation  and  Development  (COMM)

$19,674 COMM_Key

Washington Dunlevy  Borough Borough  Park KEY-­‐SC-­‐5-­‐51 $15,074 $15,000 5 Small  Communities/Small  Projects  (COMM)

$15,074 COMM_Key

Washington East Bethlehem Township

Community Square - Phase 2 - Development

BRC-SC-19-38

$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)

$59,625.00 COMM_Key

Washington East Bethlehem Township

Community Square - Phase 2 - Development

BRC-SC-19-38

$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)

$59,625.00 COMM_Key

Page 524: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  524  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Washington East Bethlehem Township

Community Square - Phase 2 - Development

BRC-SC-19-38

$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)

$59,625.00 COMM_Key

Washington East  Finley  Township Township  Park KEY-­‐SC-­‐5-­‐55 $20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$21,600 COMM_Key

Washington Elco  Borough Children's  Playground

BRC-­‐SC-­‐11-­‐118

$21,400 $21,400 11 Small  Communities/Small  Projects  (COMM)

$22,800 COMM_Key

Washington Houston  Borough Houston  Borough  Recreational  Facility

BRC-­‐SC-­‐7-­‐87

$24,414 $24,000 7 Small  Communities/Small  Projects  (COMM)

$33,608 COMM_Key

Washington McDonald  Area  Redevelopment  Association  

McDonald  Trail  Station  &  Meeting  House  (Phase  II)

BRC-­‐RTD-­‐10-­‐8

$37,105 $37,000 10 Rail  Rehabilitation  and  Development  (RT)

$80,805 RT_Key

Washington McDonald  Borough Heritage  Park KEY-­‐SC-­‐5-­‐126

$14,834 $14,800 5 Small  Communities/Small  Projects  (COMM)

$17,334 COMM_Key

Washington McDonald  Borough Heritage  Park-­‐Tennis/Basketball  Courts

BRC-­‐SC-­‐11-­‐136

$40,000 $40,000 11 Small  Communities/Small  Projects  (COMM)

$62,600 COMM_Key

Page 525: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  525  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Washington Midway  Borough Midway  Ballfields KEY-­‐SC-­‐3-­‐137

$5,500 $5,500 3 Small  Communities/Small  Projects  (COMM)

$6,000 COMM_Key

Washington Monongahela  City Monongahela  Aquatorium  -­‐  Development

BRC-­‐PRD-­‐16-­‐148

$127,000 $127,000 16 Park  Rehabilitation  and  Development  (COMM)

$254,000 COMM_Key

Washington Montour  Trail  Council  

Montour  Trail KEY-­‐RTA-­‐95-­‐19

$3,700 $3,700 1 Acquisition  (RT) $7,400 RT_Key

Washington Montour  Trail  Council  

Montour  Trail  -­‐  Phase  19

BRC-­‐RTD-­‐13.3-­‐401

$173,500 $173,400 13.3 Park  Rehabilitation  and  Development  (COMM)

$1,192,500 RT_Key

Washington Montour  Trail  Council  

Montour  Trail  -­‐  Phases  5,  7,  and  8

KEY-­‐RTD-­‐3-­‐13

$89,000 $89,000 3 Rail  Rehabilitation  and  Development  (RT)

$193,000 RT_Key

Washington Montour  Trail  Council  

Montour  Trail  -­‐  West  Peters  Section

BRC-­‐RTD-­‐12-­‐11

$134,700 $124,700 12 Rail  Rehabilitation  and  Development  (RT)

$269,400 RT_Key

Washington Montour  Trail  Council  

Montour  Trail,  Phase  11

BRC-­‐RTD-­‐9-­‐8

$73,400 $70,000 9 Rail  Rehabilitation  and  Development  (RT)

$150,200 RT_Key

Page 526: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  526  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Washington Morris  Township Morris  Township  Community  Park

BRC-­‐SC-­‐8-­‐123

$28,000 $28,000 8 Small  Communities/Small  Projects  (COMM)

$36,000 COMM_Key

Washington North  Franklin  Township  Business  &  Recreation  Improvement  Authority  

North  Franklin  Regional  Park  -­‐  Phase  I

BRC-­‐PRD-­‐13.3-­‐405

$221,700 $220,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$443,500 COMM_Key

Washington North  Franklin  Township  Business  &  Recreation  Improvement  Authority  

Township  Recreation  Facility

KEY-­‐ACQ-­‐4-­‐116

$300,000 $75,000 4 Acquisition  (COMM)

$600,000 COMM_Key

Washington North  Franklin  Township  Business  &  Recreation  Improvement  Authority  

Washington  Square  Parcels  E1  and  E2

BRC-­‐ACQ-­‐11-­‐183

$42,100 $38,000 11 Acquisition  (COMM)

$84,200 COMM_Key

Washington North  Strabane  Township

Comprehensive  Recreation,  Park  and  Open  Space  Plan

BRC-­‐TAG-­‐11.5-­‐28

$16,000 $16,000 11.5 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$40,000 COMM_Key

Washington North  Strabane  Township

Municipal  Center  Park

BRC-­‐PRD-­‐7-­‐139

$99,826 $100,000 7 Park  Rehabilitation  and  Development  (COMM)

$249,565 COMM_Key

Page 527: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  527  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Washington North  Strabane  Township

Municipal  Center  Park-­‐Phase  II

KEY-­‐PRD-­‐2-­‐113

$55,000 $55,000 2 Park  Rehabilitation  and  Development  (COMM)

$110,000 COMM_Key

Washington North  Strabane  Township

Municipal  Park  -­‐  Phase  I

BRC-­‐PRD-­‐14-­‐159

$270,000 $270,000 14 Park  Rehabilitation  and  Development  (COMM)

$620,000 COMM_Key

Washington Nottingham  Township

Sherwood  Park BRC-­‐SC-­‐11-­‐140

$20,000 $20,000 11 Small  Communities/Small  Projects  (COMM)

$27,800 COMM_Key

Washington Nottingham  Township

Township  Park BRC-­‐SC-­‐6-­‐132

$20,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$40,336 COMM_Key

Washington Peters  Township Arrowhead  Trail  Expansion

BRC-­‐RTD-­‐7-­‐11

$101,250 $69,000 7 Rail  Rehabilitation  and  Development  (RT)

$202,500 RT_Key

Washington Peters  Township PAWC  Reservoir KEY-­‐ACQ-­‐1-­‐106

$100,000 $100,000 1 Acquisition  (COMM)

$1,621,400 COMM_Key

Washington Peters  Township Pool,  Recreation  Center,  &  Skateboard  Facility

BRC-­‐TAG-­‐6-­‐144

$10,000 $10,000 6 Feasibility  Studies  (COMM)

$20,000 COMM_Key

Page 528: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  528  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Washington Somerset  Township Somerset  Township  Park

BRC-­‐SC-­‐8-­‐178

$26,000 $26,000 8 Small  Communities/Small  Projects  (COMM)

$38,500 COMM_Key

Washington South  Strabane  Township

Community  Park  -­‐  Phase  III

BRC-­‐PRD-­‐14-­‐172

$71,600 $71,600 14 Park  Rehabilitation  and  Development  (COMM)

$143,300 COMM_Key

Washington South  Strabane  Township

Community  Park-­‐  Phase  4  -­‐  Development

BRC-­‐PRD-­‐17-­‐151

$100,662 $100,600 17 Park  Rehabilitation  and  Development  (COMM)

$201,324 COMM_Key

Washington South  Strabane  Township

Laboratory  Park KEY-­‐PRD-­‐3-­‐200

$14,900 $14,900 3 Park  Rehabilitation  and  Development  (COMM)

$29,900 COMM_Key

Washington South  Strabane  Township

Zediker  Station  Park BRC-­‐PRD-­‐7-­‐176

$218,400 $218,000 7 Park  Rehabilitation  and  Development  (COMM)

$436,800 COMM_Key

Washington Trust  for  Public  Land   Peters  Township  Reservoir

KEY-­‐LTA-­‐1-­‐15

$675,000 $400,000 1 Critical  Habitat  Acquisition  (LT)

$1,600,000 LT_Key

Page 529: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  529  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Washington Union  Township Brownsville  Road  Park

BRC-­‐PRD-­‐6-­‐181

$55,000 $55,000 6 Park  Rehabilitation  and  Development  (COMM)

$110,000 COMM_Key

Washington Union  Township Pleasant  Stream  Park KEY-­‐PRD-­‐2-­‐159

$19,700 $19,700 2 Park  Rehabilitation  and  Development  (COMM)

$39,500 COMM_Key

Washington Washington  City Multi-­‐Municipal  Comprehensive  Recreation,  Open  Space  &  Greenway  Plan

BRC-­‐TAG-­‐16-­‐75

$75,000 $75,000 16 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$150,000 COMM_Key

Washington Washington  City Three  Sites KEY-­‐PRD-­‐2-­‐166

$112,810 $112,800 2 Park  Rehabilitation  and  Development  (COMM)

$244,260 COMM_Key

Washington Washington  City Washington  City  Park

BRC-­‐PRD-­‐10-­‐142

$10,000 $10,000 10 Park  Rehabilitation  and  Development  (COMM)

$28,500 COMM_Key

Washington Washington  City Washington  Park  Multi-­‐Purpose  Rec.  Facility

BRC-­‐PRD-­‐8-­‐207

$300,000 $200,000 8 Park  Rehabilitation  and  Development  (COMM)

$1,100,800 COMM_Key

Page 530: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  530  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Washington Washington  County Comprehensive  Rec.,  Park  and  Open  Space

KEY-­‐TAG-­‐3-­‐227

$30,000 $30,000 3 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$60,000 COMM_Key

Washington Washington  County Henry  House KEY-­‐PRD-­‐1-­‐144

$28,000 $28,000 1 Park  Rehabilitation  and  Development  (COMM)

$70,000 COMM_Key

Washington Washington  County Mingo  and  Cross  Creek  Parks

BRC-­‐PRD-­‐11-­‐97

$54,500 $54,500 11 Park  Rehabilitation  and  Development  (COMM)

$109,000 COMM_Key

Washington Washington  County Mingo  Creek  County  Park

BRC-­‐PRD-­‐7-­‐199

$160,000 $160,000 7 Park  Rehabilitation  and  Development  (COMM)

$320,000 COMM_Key

Washington Washington  County Panhandle  Trail BRC-­‐RTD-­‐14-­‐180

$65,000 $65,000 14 Rail  Rehabilitation  and  Development  (RT)

$465,000 RT_Key

Washington Washington  County Panhandle  Trail BRC-­‐RTD-­‐6-­‐21

$55,000 $50,000 6 Rail  Rehabilitation  and  Development  (RT)

$597,000 RT_Key

Page 531: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  531  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Washington Washington  County Panhandle  Trail-­‐Station  St.  -­‐  Dinsmore  Road

BRC-­‐RTD-­‐10-­‐15

$70,000 $70,000 10 Rail  Rehabilitation  and  Development  (RT)

$140,000 RT_Key

Washington Washington  County Ten  Mile  Park KEY-­‐PRD-­‐5-­‐213

$25,000 $25,000 5 Park  Rehabilitation  and  Development  (COMM)

$50,000 COMM_Key

Washington Washington  County Washington  County  Greenways  &  Open  Space  Plan

BRC-­‐TAG-­‐11-­‐238

$55,000 $55,000 11 Greenway  Plans  (COMM)

$110,000 COMM_Key

Washington Washington  County  Watershed  Alliance  

Upper  Chartiers  Creek  Watershed  Plan

BRC-­‐RCP-­‐6-­‐21

$64,000 $64,000 6 Planning  (RIV) $108,000 RIVER_Key

Wayne Bethany  Borough Bethany  Borough  Park  Enhancement

BRC-­‐SC-­‐10-­‐67

$30,000 $30,000 10 Small  Communities/Small  Projects  (COMM)

$35,000 COMM_Key

Wayne Bethany  Borough Bethany  Park  Playground  Rehabilitation

BRC-­‐SC-­‐12-­‐83

$30,000 $30,000 12 Small  Communities/Small  Projects  (COMM)

$40,000 COMM_Key

Wayne Bethany  Borough Central  Wayne  Comprehensive  Recreation,  Open  Space  and  Greenway  Plan

BRC-­‐TAG-­‐15-­‐86

$36,200 $36,200 15 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$211,200 COMM_Key

Page 532: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  532  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Wayne Damascus  Township Damascus  Recreation  Complex

KEY-­‐SC-­‐5-­‐42 $20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$20,969 COMM_Key

Wayne Damascus  Township Damascus  Recreational  Complex

KEY-­‐SC-­‐4-­‐40 $20,000 $20,000 4 Small  Communities/Small  Projects  (COMM)

$21,346 COMM_Key

Wayne Dreher  Township Carlton  Drake  Memorial  Park  Addn.

BRC-­‐ACQ-­‐6-­‐55

$72,210 $30,000 6 Acquisition  (COMM)

$144,420 COMM_Key

Wayne Dreher  Township Township  Park  Master  Site  Plan

BRC-­‐TAG-­‐8-­‐58

$14,000 $14,000 8 Master  Site  Plans  (COMM)

$28,000 COMM_Key

Wayne Hawley  Borough Bingham  Park KEY-­‐SC-­‐3-­‐84 $20,000 $20,000 3 Small  Communities/Small  Projects  (COMM)

$21,900 COMM_Key

Wayne Hawley  Borough Riverside  Park KEY-­‐PRD-­‐4-­‐65

$60,670 $60,000 4 Park  Rehabilitation  and  Development  (COMM)

$124,955 COMM_Key

Wayne Hawley  Borough Skate  Park BRC-­‐SC-­‐11-­‐127

$40,000 $40,000 11 Small  Communities/Small  Projects  (COMM)

$55,900 COMM_Key

Wayne Lacawac  Sanctuary  Foundation,  Inc.  

Lacawac  Sanctuary  Master  Site  Plan

BRC-­‐LTP-­‐13.3-­‐477

$26,000 $26,000 13.3 Master  Site  Plans  (COMM)

$52,000 LT_Key

Wayne Lacawac  Sanctuary  Foundation,  Inc.  

Ledges  Tract KEY-­‐LTA-­‐2-­‐4 $255,300 $225,000 2 Critical  Habitat  Acquisition  (LT)

$450,000 LT_Key

Page 533: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  533  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Wayne Lacawac  Sanctuary  Foundation,  Inc.  

Reed  Property  Acquisition

BRC-­‐LTA-­‐8-­‐7

$373,800 $150,000 8 Critical  Habitat  Acquisition  (LT)

$747,500 LT_Key

Wayne Lacawac  Sanctuary  Foundation,  Inc.  

Rizza  Property BRC-­‐LTA-­‐7-­‐11

$44,600 $17,000 7 Open  Space  Acquisition  (LT)

$89,200 LT_Key

Wayne Lehigh  Township Union  Park KEY-­‐SC-­‐4-­‐82 $20,000 $20,000 4 Small  Communities/Small  Projects  (COMM)

$26,419 COMM_Key

Wayne Natural  Lands  Trust,  Inc.  

Goose  Pond BRC-­‐LTA-­‐7-­‐13

$505,000 $250,000 7 Critical  Habitat  Acquisition  (LT)

$1,035,000 LT_Key

Wayne Natural  Lands  Trust,  Inc.  

Goose  Pond  Conservation  Easement

BRC-­‐LTA-­‐8-­‐9

$250,000 $250,000 8 Critical  Habitat  Acquisition  (LT)

$1,000,000 LT_Key

Wayne Paupack  Township Christophersen  Land  Acquisition

BRC-­‐ACQ-­‐16-­‐27

$33,790 $33,700 16 Acquisition  (COMM)

$67,580 COMM_Key

Wayne Paupack  Township Lakeville  Recreation  Complex

BRC-­‐SC-­‐9-­‐160

$40,000 $39,000 9 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Wayne Paupack  Township Lakeville  Recreation  Complex

KEY-­‐SC-­‐5-­‐156

$20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$23,964 COMM_Key

Wayne Paupack  Township Lakeville  Recreation  Complex  -­‐  Playground  Renovation

BRC-­‐SC-­‐12-­‐113

$20,000 $20,000 12 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Page 534: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  534  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Wayne Paupack  Township Multi-­‐Municipal  Recreation  and  Park  Plan

BRC-­‐TAG-­‐11.5-­‐29

$30,000 $30,000 11.5 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$60,000 COMM_Key

Wayne Paupack  Township Paupack  Recreational  Complex

KEY-­‐SC-­‐2-­‐116

$19,779 $19,700 2 Small  Communities/Small  Projects  (COMM)

$21,729 COMM_Key

Wayne Paupack  Township Picnic  Pavilion BRC-­‐SC-­‐7-­‐149

$20,056 $20,000 7 Small  Communities/Small  Projects  (COMM)

$20,056 COMM_Key

Wayne Starrucca  Borough Borough  Park KEY-­‐SC-­‐3-­‐207

$15,300 $15,300 3 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Wayne Wayne  County County  Park  &  Recreation  Complex

BRC-­‐TAG-­‐13-­‐210

$15,000 $15,000 13 Master  Site  Plans  (COMM)

$30,000 COMM_Key

Wayne Wayne  County Recreation  Complex  -­‐  Development

BRC-­‐PRD-­‐17-­‐160

$40,000 $40,000 17 Park  Rehabilitation  and  Development  (COMM)

$80,000 COMM_Key

Wayne Wayne  County  Conservation  District  

Reinings  Pond  Feasibility/Master  Site  Plan

BRC-­‐TAG-­‐9-­‐226

$20,000 $20,000 9 Feasibility  Studies  (COMM)

$41,300 COMM_Key

Westmoreland Allegheny  Township Community  Park KEY-­‐ACQ-­‐3-­‐7

$26,200 $25,000 3 Acquisition  (COMM)

$52,400 COMM_Key

Page 535: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  535  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Westmoreland Allegheny  Township Finnin  Park BRC-­‐PRD-­‐6-­‐10

$36,500 $36,500 6 Park  Rehabilitation  and  Development  (COMM)

$73,000 COMM_Key

Westmoreland Allegheny  Township Tredway  Trail  Extension  

BRC-­‐ACQ-­‐15-­‐41

$155,000 $155,000 15 Acquisition  (COMM)

$310,000 COMM_Key

Westmoreland Allegheny  Township Tredway  Trail  Extension  -­‐  Phase  II  -­‐  Acquisition

BRC-­‐ACQ-­‐18-­‐3

$160,000 $160,000 18 Acquisition  (COMM)

$320,000 COMM_Key

Westmoreland Allegheny  Township Wynn  &  Clara  Tredway  River  Park

BRC-­‐RTD-­‐9-­‐13

$89,000 $89,000 9 Rail  Rehabilitation  and  Development  (RT)

$178,000 RT_Key

Westmoreland Arnold  City Kennedy  Riverside  Park

BRC-­‐PRD-­‐10-­‐110

$205,000 $150,000 10 Park  Rehabilitation  and  Development  (COMM)

$410,000 COMM_Key

Westmoreland Arnold  City Roosevelt  Park KEY-­‐PRD-­‐1-­‐5

$75,000 $75,000 1 Park  Rehabilitation  and  Development  (COMM)

$153,535 COMM_Key

Westmoreland Arona  Borough Community  Park BRC-­‐SC-­‐8-­‐17

$20,200 $20,000 8 Small  Communities/Small  Projects  (COMM)

$30,100 COMM_Key

Westmoreland Avonmore  Borough Avonmore  Canoe  Launch

BRC-­‐RCD-­‐8-­‐24

$10,000 $10,000 8 Development  (RIV)

$20,000 RIVER_Key

Page 536: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  536  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Westmoreland Avonmore  Borough Community  Park KEY-­‐SC-­‐4-­‐11 $12,450 $12,500 4 Small  Communities/Small  Projects  (COMM)

$17,450 COMM_Key

Westmoreland Bolivar  Borough Kelly  Field KEY-­‐SC-­‐1-­‐13 $20,000 $20,000 1 Small  Communities/Small  Projects  (COMM)

$32,150 COMM_Key

Westmoreland Delmont Borough Newhouse Park -Development

BRC-SC-19-36

$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)

$60,000.00 COMM_Key

Westmoreland Delmont Borough Newhouse Park -Development

BRC-SC-19-36

$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)

$60,000.00 COMM_Key

Westmoreland Delmont Borough Newhouse Park -Development

BRC-SC-19-36

$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)

$60,000.00 COMM_Key

Westmoreland Derry  Area  Recreation  Board  

Peer  to  Peer BRC-­‐TAG-­‐12-­‐2

$10,000 $10,000 12 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$11,000 COMM_Key

Westmoreland Derry  Borough Derry  Community  Pool

BRC-­‐PRD-­‐6-­‐52

$100,000 $225,000 6 Park  Rehabilitation  and  Development  (COMM)

$450,000 COMM_Key

Westmoreland Derry  Borough Lake  Ethel  Trail KEY-­‐SC-­‐5-­‐45 $20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$30,400 COMM_Key

Page 537: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  537  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Westmoreland Export Borough J.M. Hall, Jr. Park Master Site Plan

BRC-TAG-19-132

$15,400.00 $15,400.00 19 Master Site Plans (COMM)

$30,800.00 COMM_Key

Westmoreland Export Borough J.M. Hall, Jr. Park Master Site Plan

BRC-TAG-19-132

$15,400.00 $15,400.00 19 Master Site Plans (COMM)

$30,800.00 COMM_Key

Westmoreland Export Borough J.M. Hall, Jr. Park Master Site Plan

BRC-TAG-19-132

$15,400.00 $15,400.00 19 Master Site Plans (COMM)

$30,800.00 COMM_Key

Westmoreland Greensburg  City Kirk  S.  Nevin  Ice  Rink BRC-­‐PRD-­‐14-­‐143

$43,400 $43,400 14 Park  Rehabilitation  and  Development  (COMM)

$86,800 COMM_Key

Westmoreland Greensburg  City Lynch  Field KEY-­‐PRD-­‐2-­‐54

$25,500 $25,500 2 Park  Rehabilitation  and  Development  (COMM)

$51,367 COMM_Key

Westmoreland Greensburg  City Lynch  Field  Renovation

BRC-­‐PRD-­‐10-­‐119

$21,736 $20,000 10 Park  Rehabilitation  and  Development  (COMM)

$43,472 COMM_Key

Westmoreland Greensburg  City St.  Clair  Park KEY-­‐PRD-­‐5-­‐76

$43,388 $43,000 5 Park  Rehabilitation  and  Development  (COMM)

$86,775 COMM_Key

Westmoreland Greensburg  City University  Center  for  the  Arts

BRC-­‐PRD-­‐12-­‐156

$400,000 $200,000 12 Park  Rehabilitation  and  Development  (COMM)

$13,697,000 COMM_Key

Page 538: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  538  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Westmoreland Hempfield  Township Community  Park KEY-­‐ACQ-­‐5-­‐85

$92,988 $65,000 5 Acquisition  (COMM)

$185,975 COMM_Key

Westmoreland Hempfield  Township Playgrounds  -­‐  Eleven  Sites

KEY-­‐PRD-­‐1-­‐60

$144,265 $100,000 1 Park  Rehabilitation  and  Development  (COMM)

$288,531 COMM_Key

Westmoreland Hempfield  Township Seven  Sites KEY-­‐PRD-­‐3-­‐86

$100,000 $100,000 3 Park  Rehabilitation  and  Development  (COMM)

$218,000 COMM_Key

Westmoreland Hunker  Borough Two  Sites KEY-­‐SC-­‐5-­‐91 $20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$21,833 COMM_Key

Westmoreland Irwin  Borough Irwin  Borough  Street  Scapes  and  Gateways

BRC-­‐PRD-­‐12.5-­‐32

$350,000 $350,000 12.5 Park  Rehabilitation  and  Development  (COMM)

$2,313,750 COMM_Key

Westmoreland Irwin  Borough Irwin  Park BRC-­‐SC-­‐6-­‐87

$20,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$33,515 COMM_Key

Westmoreland Irwin  Borough Irwin  Park  and  Penglyn  Field

BRC-­‐SC-­‐10-­‐84

$40,000 $30,000 10 Small  Communities/Small  Projects  (COMM)

$60,100 COMM_Key

Page 539: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  539  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Westmoreland Jeannette  City West  Jeannette  Park KEY-­‐PRD-­‐5-­‐96

$138,822 $138,800 5 Park  Rehabilitation  and  Development  (COMM)

$657,430 COMM_Key

Westmoreland Latrobe  City Legion-­‐Keener  Park KEY-­‐PRD-­‐3-­‐108

$88,000 $88,000 3 Park  Rehabilitation  and  Development  (COMM)

$176,000 COMM_Key

Westmoreland Latrobe City Lincoln Avenue Trail & Greenway Park - Development

BRC-RTD-19-153

$250,000.00 $250,000.00 19 Rail Rehabilitation and Development (RT)

$500,025.00 COMM_Key

Westmoreland Latrobe City Lincoln Avenue Trail & Greenway Park - Development

BRC-RTD-19-153

$250,000.00 $250,000.00 19 Rail Rehabilitation and Development (RT)

$500,025.00 COMM_Key

Westmoreland Latrobe City Lincoln Avenue Trail & Greenway Park - Development

BRC-RTD-19-153

$250,000.00 $250,000.00 19 Rail Rehabilitation and Development (RT)

$500,025.00 COMM_Key

Westmoreland Latrobe City Lincoln Avenue Trail & Greenway Park - Development

BRC-RTD-19-153

$250,000.00 $250,000.00 19 Rail Rehabilitation and Development (RT)

$500,025.00 COMM_Key

Page 540: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  540  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Westmoreland Latrobe-­‐Unity  Youngstown  Parks  &  Recreation  Commission  

Cardinal  Park  -­‐  Phase  2  -­‐  Development

BRC-­‐PRD-­‐16-­‐143

$103,500 $103,500 16 Park  Rehabilitation  and  Development  (COMM)

$207,000 COMM_Key

Westmoreland Latrobe-­‐Unity  Youngstown  Parks  &  Recreation  Commission  

Cardinal  Park-­‐Phase  3-­‐  Development

BRC-­‐PRD-­‐18-­‐79

$79,956 $80,000 18 Park  Rehabilitation  and  Development  (COMM)

$159,956 COMM_Key

Westmoreland Latrobe-­‐Unity  Youngstown  Parks  &  Recreation  Commission  

John  Street  Parklet-­‐-­‐  Development

BRC-­‐PRD-­‐17-­‐129

$18,900 $18,900 17 Park  Rehabilitation  and  Development  (COMM)

$37,900 COMM_Key

Westmoreland Latrobe-­‐Unity  Youngstown  Parks  &  Recreation  Commission  

Unity  Park-­‐  Phase  II BRC-­‐PRD-­‐13-­‐381

$180,700 $180,700 13 Park  Rehabilitation  and  Development  (COMM)

$361,500 COMM_Key

Westmoreland Latrobe-­‐Unity  Youngstown  Parks  &  Recreation  Commission  

Unity-­‐Hillside-­‐Cardinal-­‐Central-­‐Pleasant  Unity  Parks

BRC-­‐PRD-­‐12-­‐166

$350,000 $300,000 12 Park  Rehabilitation  and  Development  (COMM)

$700,000 COMM_Key

Westmoreland Ligonier  Township Conservation  and  Walking  Trail

BRC-­‐PRD-­‐7-­‐101

$58,570 $55,000 7 Park  Rehabilitation  and  Development  (COMM)

$113,570 COMM_Key

Page 541: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  541  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Westmoreland Lower  Burrell  City Wolf  Pak  Park BRC-­‐ACQ-­‐7-­‐105

$91,900 $91,000 7 Acquisition  (COMM)

$183,800 COMM_Key

Westmoreland Loyalhanna  Township

Elrico  Playground BRC-­‐SC-­‐12-­‐106

$27,000 $26,900 12 Small  Communities/Small  Projects  (COMM)

$33,900 COMM_Key

Westmoreland Loyalhanna  Watershed  Association,  Inc.  

Keystone  Run  AMD  Education  Interpretation

BRC-­‐RCD-­‐6-­‐18

$25,000 $25,000 6 Development  (RIV)

$50,000 RIVER_Key

Westmoreland Loyalhanna  Watershed  Association,  Inc.  

Linn  Run  Loop  -­‐  PW&S  Railroad  Bike  Trail

KEY-­‐RTD-­‐95-­‐18

$35,000 $35,000 1 Rail  Rehabilitation  and  Development  (RT)

$85,000 RT_Key

Westmoreland Madison  Borough Madison  Park BRC-­‐SC-­‐6-­‐103

$14,900 $15,000 6 Small  Communities/Small  Projects  (COMM)

$20,400 COMM_Key

Westmoreland Monessen  City City  Park  -­‐  Phase  1  -­‐  Development

BRC-­‐PRD-­‐17-­‐139

$250,000 $250,000 17 Park  Rehabilitation  and  Development  (COMM)

$500,000 COMM_Key

Westmoreland Monessen  City Monessen  Parks  Improvement  Project  -­‐  5  Parks

BRC-­‐PRD-­‐9-­‐136

$71,600 $70,000 9 Park  Rehabilitation  and  Development  (COMM)

$165,000 COMM_Key

Page 542: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  542  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Westmoreland Mount  Pleasant  Borough

Veterans'  Park  Extension

BRC-­‐SC-­‐8-­‐125

$40,000 $40,000 8 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Westmoreland Murrysville  Municipality

Chambers  Park KEY-­‐PRD-­‐1-­‐90

$15,000 $15,000 1 Park  Rehabilitation  and  Development  (COMM)

$30,050 COMM_Key

Westmoreland Murrysville  Municipality

Townsend  and  PV  Master  Site  Plans

BRC-­‐TAG-­‐6-­‐121

$35,000 $35,000 6 Master  Site  Plans  (COMM)

$70,000 COMM_Key

Westmoreland Murrysville  Municipality

Townsend  Park-­‐Development

BRC-­‐PRD-­‐18-­‐85

$42,000 $42,000 18 Park  Rehabilitation  and  Development  (COMM)

$84,000 COMM_Key

Westmoreland New  Alexandria  Borough

Borough  Park KEY-­‐SC-­‐5-­‐142

$20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$25,853 COMM_Key

Westmoreland New  Kensington  City Comp  Park  &  Rec  Plan

BRC-­‐TAG-­‐8-­‐130

$20,000 $20,000 8 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$40,000 COMM_Key

Westmoreland New  Kensington  City Memorial  Park  Improvements

BRC-­‐PRD-­‐8-­‐131

$80,000 $80,000 8 Park  Rehabilitation  and  Development  (COMM)

$160,900 COMM_Key

Page 543: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  543  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Westmoreland New  Kensington  City Six  Sites KEY-­‐PRD-­‐4-­‐113

$140,000 $100,000 4 Park  Rehabilitation  and  Development  (COMM)

$280,000 COMM_Key

Westmoreland New  Stanton  Borough

Community  Park KEY-­‐SC-­‐5-­‐146

$19,902 $20,000 5 Small  Communities/Small  Projects  (COMM)

$19,902 COMM_Key

Westmoreland North  Belle  Vernon  Borough

Graham  Street  Park KEY-­‐SC-­‐3-­‐153

$19,700 $19,700 3 Small  Communities/Small  Projects  (COMM)

$19,700 COMM_Key

Westmoreland North  Belle  Vernon  Borough

Graham  Street  Park KEY-­‐SC-­‐5-­‐150

$20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$40,100 COMM_Key

Westmoreland North  Huntingdon  Township

Regional  Recreation  Feasibility  Study

BRC-­‐TAG-­‐13.6-­‐600

$15,000 $15,000 13.6 Feasibility  Studies  (COMM)

$35,000 COMM_Key

Westmoreland North  Huntingdon  Township

Three  Sites KEY-­‐PRD-­‐3-­‐155

$20,000 $20,000 3 Park  Rehabilitation  and  Development  (COMM)

$40,000 COMM_Key

Westmoreland Oklahoma  Borough Borough  Park KEY-­‐SC-­‐3-­‐161

$20,000 $20,000 3 Small  Communities/Small  Projects  (COMM)

$21,800 COMM_Key

Page 544: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  544  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Westmoreland Penn  Township Penn-­‐Trafford  Peer BRC-­‐TAG-­‐7-­‐5

$7,500 $7,500 7 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$8,250 COMM_Key

Westmoreland Penn  Trafford  Area  Recreation  Commission  

Demonstration  Playground  Conduit  Grant

BRC-­‐PRD-­‐11-­‐65

$116,000 $116,000 11 Park  Rehabilitation  and  Development  (COMM)

$171,500 COMM_Key

Westmoreland Penn  Trafford  Area  Recreation  Commission  

Demonstration  Playground  Conduit  Grant

BRC-­‐PRD-­‐9-­‐162

$95,400 $95,000 9 Park  Rehabilitation  and  Development  (COMM)

$161,440 COMM_Key

Westmoreland Penn  Trafford  Area  Recreation  Commission  

Level  Green,  6th  &  Cavitt,  Penn  Parks

BRC-­‐PRD-­‐13-­‐133

$202,300 $200,000 13 Park  Rehabilitation  and  Development  (COMM)

$376,400 COMM_Key

Westmoreland Penn  Trafford  Area  Recreation  Commission  

Penn  Township  Municipal  Park  and  Mt.  Manor  Park  -­‐  Development

BRC-­‐PRD-­‐16-­‐153

$350,105 $305,600 16 Park  Rehabilitation  and  Development  (COMM)

$680,417 COMM_Key

Westmoreland Penn  Trafford  Area  Recreation  Commission  

Penn  Township  Municipal  Park  Master  Site  Plan

BRC-­‐TAG-­‐11-­‐230

$23,100 $15,000 11 Master  Site  Plans  (COMM)

$46,200 COMM_Key

Westmoreland Penn  Trafford  Area  Recreation  Commission  

Sunrise  Park  Master  Site  Plan

BRC-­‐TAG-­‐10-­‐164

$16,400 $16,000 10 Master  Site  Plans  (COMM)

$32,800 COMM_Key

Page 545: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  545  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Westmoreland Penn  Trafford  Area  Recreation  Commission  

Trafford  B-­‐Y  and  Penn  Parks

BRC-­‐SC-­‐14-­‐99

$80,000 $80,000 14 Small  Communities/Small  Projects  (COMM)

$120,000 COMM_Key

Westmoreland Regional  Trail  Corporation  

Coal  and  Coke  Trail BRC-­‐RTA-­‐7-­‐14

$19,500 $19,500 7 Acquisition  (RT) $39,000 RT_Key

Westmoreland Regional  Trail  Corporation  

Coal  and  Coke  Trail BRC-­‐RTD-­‐9-­‐10

$117,000 $100,000 9 Rail  Rehabilitation  and  Development  (RT)

$375,000 RT_Key

Westmoreland Regional  Trail  Corporation  

Westmoreland  Yough  Trail  Chapter  of  RTC

BRC-­‐PRT-­‐6-­‐26

$18,400 $18,400 6 Maintenance  and  Restoration

$23,000 RIVER_Key

Westmoreland Regional  Trail  Corporation  

Youghiogheny  River  Environmental  Educational  Ctr.

KEY-­‐RCD-­‐5-­‐17

$100,000 $110,000 5 Development  (RIV)

$263,600 RIVER_Key

Westmoreland Rostraver  Township Comprehensive  Recreation,  Park  and  Open  Space  Plan

BRC-­‐TAG-­‐12.5-­‐22

$14,900 $14,900 12.5 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$29,800 COMM_Key

Westmoreland Rostraver  Township DiVirgilio  Sports  Complex

BRC-­‐PRD-­‐11-­‐76

$80,000 $80,000 11 Park  Rehabilitation  and  Development  (COMM)

$160,000 COMM_Key

Page 546: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  546  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Westmoreland Rostraver  Township Recreation  Park KEY-­‐PRD-­‐2-­‐133

$100,000 $100,000 2 Park  Rehabilitation  and  Development  (COMM)

$285,000 COMM_Key

Westmoreland Salem  Township Salem  Township  Recreation  Park

BRC-­‐TAG-­‐7-­‐169

$20,000 $20,000 7 Master  Site  Plans  (COMM)

$40,000 COMM_Key

Westmoreland Salem  Township Seanor  Central  Park KEY-­‐ACQ-­‐5-­‐176

$262,500 $150,000 5 Acquisition  (COMM)

$523,500 COMM_Key

Westmoreland Salem  Township Seanor  Farm  Park  -­‐Phase  1A  -­‐Development

BRC-­‐PRD-­‐18-­‐96

$218,230 $218,000 18 Park  Rehabilitation  and  Development  (COMM)

$436,461 COMM_Key

Westmoreland Scott  Conservancy   King  Nature  Reserve KEY-­‐LTA-­‐3-­‐20

$126,000 $90,000 3 Open  Space  Acquisition  (LT)

$240,000 LT_Key

Westmoreland Scottdale  Borough Jacob's  Creek  Walking  Trail

KEY-­‐PRD-­‐3-­‐192

$17,500 $17,500 3 Park  Rehabilitation  and  Development  (COMM)

$35,000 COMM_Key

Westmoreland Scottdale  Borough Kendi  and  Barclay  Parks

BRC-­‐PRD-­‐9-­‐182

$185,000 $197,500 9 Park  Rehabilitation  and  Development  (COMM)

$395,000 COMM_Key

Westmoreland Scottdale  Borough Loucks  Park BRC-­‐SC-­‐12-­‐122

$40,000 $40,000 12 Small  Communities/Small  Projects  (COMM)

$63,100 COMM_Key

Page 547: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  547  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Westmoreland Scottdale  Borough Park  Playground  and  Facilities

BRC-­‐PRD-­‐7-­‐170

$271,749 $120,000 7 Park  Rehabilitation  and  Development  (COMM)

$543,500 COMM_Key

Westmoreland Seward  Borough Borough  Park BRC-­‐SC-­‐6-­‐163

$20,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$24,000 COMM_Key

Westmoreland Seward  Borough Memorial  Park BRC-­‐SC-­‐7-­‐172

$10,680 $20,000 7 Small  Communities/Small  Projects  (COMM)

$26,595 COMM_Key

Westmoreland Sewickley  Creek  Watershed  Association,  Inc.  

Sewickley  Creek  Watershed  Plan

BRC-­‐RCP-­‐6-­‐19

$85,000 $85,000 6 Planning  (RIV) $171,400 RIVER_Key

Westmoreland Sewickley  Township Crabapple  Lake  Park  l

KEY-­‐PRD-­‐3-­‐193

$64,600 $64,600 3 Park  Rehabilitation  and  Development  (COMM)

$129,300 COMM_Key

Westmoreland Sewickley  Township JPG  Park BRC-­‐PRD-­‐8-­‐169

$47,400 $47,500 8 Park  Rehabilitation  and  Development  (COMM)

$105,000 COMM_Key

Westmoreland Sewickley  Township JPG  Park BRC-­‐PRD-­‐8-­‐169

$47,400 $5,000 8 Park  Rehabilitation  and  Development  (COMM)

$105,000 COMM_Key

Page 548: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  548  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Westmoreland Sewickley  Township Recreation  Center KEY-­‐PRD-­‐1-­‐123

$26,246 $10,000 1 Park  Rehabilitation  and  Development  (COMM)

$52,492 COMM_Key

Westmoreland The  Conservation  Fund  

Lazar  (Bushy  Run  Battlefield)

BRC-­‐LTA-­‐10-­‐18

$407,500 $200,000 10 Open  Space  Acquisition  (LT)

$815,000 LT_Key

Westmoreland Trafford  Borough B-­‐Y  Park KEY-­‐PRD-­‐2-­‐157

$142,250 $139,000 2 Park  Rehabilitation  and  Development  (COMM)

$284,500 COMM_Key

Westmoreland Vandergrift  Borough Vandergrift  Community  Swimming  Pool

BRC-­‐PRD-­‐8-­‐205

$104,200 $104,000 8 Park  Rehabilitation  and  Development  (COMM)

$208,500 COMM_Key

Westmoreland Washington  Township

Kunkle  Park BRC-­‐PRD-­‐7-­‐201

$100,000 $100,000 7 Park  Rehabilitation  and  Development  (COMM)

$200,000 COMM_Key

Westmoreland West  Leechburg  Borough

Memorial  Park KEY-­‐SC-­‐2-­‐173

$18,600 $18,600 2 Small  Communities/Small  Projects  (COMM)

$24,100 COMM_Key

Westmoreland West  Newton  Borough

Borough  Park KEY-­‐SC-­‐1-­‐148

$14,925 $14,900 1 Small  Communities/Small  Projects  (COMM)

$21,925 COMM_Key

Page 549: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  549  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Westmoreland West  Newton  Borough

Goerhing  Park  Playground

BRC-­‐SC-­‐11-­‐164

$20,000 $20,000 11 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Westmoreland Western  Pennsylvania  Conservancy  

Chestnut  Ridge  Acquisition

BRC-­‐LTA-­‐8-­‐20

$205,300 $205,000 8 Critical  Habitat  Acquisition  (LT)

$410,600 LT_Key

Westmoreland Western  Pennsylvania  Conservancy  

Randall  Reserve  Conservation  Easement

BRC-­‐LTA-­‐13-­‐35

$79,500 $79,500 13 Critical  Habitat  Acquisition  (LT)

$159,000 LT_Key

Westmoreland Westmoreland  Conservancy  

AJSE  Property BRC-­‐LTA-­‐7-­‐24

$34,500 $34,000 7 Critical  Habitat  Acquisition  (LT)

$68,000 LT_Key

Westmoreland Westmoreland  County

Comprehensive  Recreation  Park  and  Open  S

KEY-­‐TAG-­‐3-­‐238

$40,000 $40,000 3 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$80,000 COMM_Key

Westmoreland Westmoreland  County

Five  Star  Trail BRC-­‐PRD-­‐8-­‐215

$45,000 $45,000 8 Park  Rehabilitation  and  Development  (COMM)

$720,000 COMM_Key

Westmoreland Westmoreland  County

Five  Star  Trail  Development

KEY-­‐RTD-­‐3-­‐25

$50,000 $50,000 3 Rail  Rehabilitation  and  Development  (RT)

$345,000 RT_Key

Page 550: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  550  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Westmoreland Westmoreland  County

Little  Crabtree  Creek  Trail  -­‐  Phase  I  -­‐  Development

BRC-­‐PRD-­‐18-­‐179

$284,400 $177,000 18 Park  Rehabilitation  and  Development  (COMM)

$355,500 COMM_Key

Westmoreland Westmoreland  County

Natural  Heritage  Inventory

KEY-­‐TAG-­‐1-­‐149

$30,000 $25,000 1 Natural  Areas  Inventories  (COMM)

$60,000 COMM_Key

Westmoreland Westmoreland  County

Twin  Lakes  Park BRC-­‐PRD-­‐13-­‐173

$325,000 $100,000 13 Park  Rehabilitation  and  Development  (COMM)

$650,000 COMM_Key

Westmoreland Westmoreland  County

Westmoreland  Land  Trust  Acquisitions  -­‐  Phase  II

BRC-­‐ACQ-­‐16-­‐29

$166,263 $166,000 16 Acquisition  (COMM)

$332,526 COMM_Key

Wyoming Clinton  Township Joint  Municipal  Park  -­‐  Development

BRC-­‐SC-­‐16-­‐40

$40,000 $40,000 16 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

Wyoming Clinton Township Joint Municipal Park Project Phase II

BRC-PRD-19-203

$236,000.00 $170,000.00 19 Park Rehabilitation and Development (COMM)

$472,000.00 COMM_Key

Wyoming Clinton Township Joint Municipal Park Project Phase II

BRC-PRD-19-203

$236,000.00 $170,000.00 19 Park Rehabilitation and Development (COMM)

$472,000.00 COMM_Key

Page 551: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  551  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Wyoming Clinton Township Joint Municipal Park Project Phase II

BRC-PRD-19-203

$236,000.00 $170,000.00 19 Park Rehabilitation and Development (COMM)

$472,000.00 COMM_Key

Wyoming Exeter  Township George  R.  Hock  Community  Park

KEY-­‐SC-­‐5-­‐65 $20,000 $20,000 5 Small  Communities/Small  Projects  (COMM)

$26,491 COMM_Key

Wyoming Exeter  Township George  R.  Hock  Memorial  Park  Rehabilitation

BRC-­‐SC-­‐12-­‐94

$20,000 $20,000 12 Small  Communities/Small  Projects  (COMM)

$29,200 COMM_Key

Wyoming Factoryville  Borough Christy  Mathewson  Park  -­‐  Development

BRC-­‐SC-­‐17-­‐36

$20,000 $22,000 17 Small  Communities/Small  Projects  (COMM)

$22,000 COMM_Key

Wyoming Factoryville Borough Christy Mathewson Park – Development

BRC-SC-19-41

$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)

$60,000.00 COMM_Key

Wyoming Factoryville Borough Christy Mathewson Park – Development

BRC-SC-19-41

$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)

$60,000.00 COMM_Key

Wyoming Factoryville Borough Christy Mathewson Park – Development

BRC-SC-19-41

$40,000.00 $40,000.00 19 Small Communities/Small Projects (COMM)

$60,000.00 COMM_Key

Wyoming Factoryville  Borough Christy  Mathewson  Recreational  Complex

KEY-­‐SC-­‐2-­‐48 $20,000 $20,000 2 Small  Communities/Small  Projects  (COMM)

$26,550 COMM_Key

Page 552: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  552  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Wyoming Factoryville  Borough Joint  Municipal  Park BRC-­‐PRD-­‐10-­‐116

$215,000 $165,000 10 Park  Rehabilitation  and  Development  (COMM)

$430,000 COMM_Key

Wyoming Factoryville  Borough Joint  Municipal  Park  Acquisition

BRC-­‐ACQ-­‐8-­‐68

$43,300 $43,000 8 Acquisition  (COMM)

$86,700 COMM_Key

Wyoming Factoryville  Borough Municipal  Park BRC-­‐SC-­‐13.3-­‐300

$20,000 $20,000 13.3 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

Wyoming Forkston  Township Creek  Junction  Park BRC-­‐SC-­‐14-­‐85

$30,000 $30,000 14 Small  Communities/Small  Projects  (COMM)

$40,000 COMM_Key

Wyoming Mehoopany  Township

Mehoopany  Township  Community  Park  Renovation

BRC-­‐SC-­‐12-­‐108

$26,000 $26,000 12 Small  Communities/Small  Projects  (COMM)

$32,000 COMM_Key

Wyoming Monroe  Township Beaumont  Park  Improvements

BRC-­‐SC-­‐12-­‐110

$30,100 $30,100 12 Small  Communities/Small  Projects  (COMM)

$40,200 COMM_Key

Wyoming Monroe  Township Monroe  Township  Community  Park

BRC-­‐SC-­‐7-­‐131

$28,175 $28,000 7 Small  Communities/Small  Projects  (COMM)

$36,350 COMM_Key

Wyoming Nicholson  Borough Nordahl  Park  Rehabilitation

BRC-­‐SC-­‐10-­‐92

$24,800 $28,000 10 Small  Communities/Small  Projects  (COMM)

$32,800 COMM_Key

Page 553: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  553  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

Wyoming North  Branch  Land  Trust  

Camp  Lackawanna  Easement

BRC-­‐LTA-­‐12-­‐36

$266,800 $265,000 12 Open  Space  Acquisition  (LT)

$533,500 LT_Key

Wyoming Overfield  Township Overfield  Township  Park

BRC-­‐SC-­‐11-­‐143

$40,000 $40,000 11 Small  Communities/Small  Projects  (COMM)

$62,000 COMM_Key

Wyoming The  Conservation  Fund  

State  Game  Land  #57  Indenture  (Yocum  Property)

BRC-­‐LTA-­‐7-­‐18

$32,090 $32,000 7 Open  Space  Acquisition  (LT)

$64,180 LT_Key

Wyoming Tunkhannock  Borough

Riverside  Park KEY-­‐SC-­‐1-­‐137

$20,000 $20,000 1 Small  Communities/Small  Projects  (COMM)

$25,730 COMM_Key

Wyoming Tunkhannock  Township

Lazy  Brook  Park KEY-­‐PRD-­‐4-­‐151

$50,000 $50,000 4 Park  Rehabilitation  and  Development  (COMM)

$100,000 COMM_Key

Wyoming Tunkhannock  Township

Lazybrook  Park BRC-­‐SC-­‐8-­‐193

$20,000 $20,000 8 Small  Communities/Small  Projects  (COMM)

$40,000 COMM_Key

Wyoming Tunkhannock  Township

Lazybrook  Park-­‐Development

BRC-­‐SC-­‐15-­‐83

$30,000 $30,000 15 Small  Communities/Small  Projects  (COMM)

$52,015 COMM_Key

Wyoming Washington  Township

Township  Park BRC-­‐SC-­‐6-­‐193

$20,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$23,200 COMM_Key

Page 554: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  554  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

York Carroll  Township Chestnut  Park BRC-­‐PRD-­‐14-­‐122

$147,500 $145,000 14 Park  Rehabilitation  and  Development  (COMM)

$295,000 COMM_Key

York Carroll  Township Kelley  Farm  Acquisition

BRC-­‐ACQ-­‐11-­‐172

$115,800 $98,000 11 Acquisition  (COMM)

$231,600 COMM_Key

York Carroll  Township N.  York  Rec.,  Park  &  Open  Space  Plan

BRC-­‐TAG-­‐9-­‐44

$32,500 $32,000 9 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$65,000 COMM_Key

York Codorus  Township Bailey  Property  Acquisition

BRC-­‐ACQ-­‐10-­‐177

$121,800 $100,000 10 Acquisition  (COMM)

$243,600 COMM_Key

York Codorus Township Codorus Township Municipal Park- Phase 2- Development

BRC-PRD-19-72

$92,500.00 $92,500.00 19 Park Rehabilitation and Development (COMM)

$185,000.00 COMM_Key

York Codorus Township Codorus Township Municipal Park- Phase 2- Development

BRC-PRD-19-72

$92,500.00 $92,500.00 19 Park Rehabilitation and Development (COMM)

$185,000.00 COMM_Key

York Codorus Township Codorus Township Municipal Park- Phase 2- Development

BRC-PRD-19-72

$92,500.00 $92,500.00 19 Park Rehabilitation and Development (COMM)

$185,000.00 COMM_Key

York Dillsburg  Borough Dillsburg  Community  Park  -­‐  Phase  1  -­‐  Development

BRC-­‐PRD-­‐18-­‐62

$123,000 $123,000 18 Park  Rehabilitation  and  Development  (COMM)

$246,000 COMM_Key

Page 555: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  555  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

York Dillsburg  Borough HCC  Land  Acquisition BRC-­‐ACQ-­‐17-­‐90

$250,000 $234,800 17 Acquisition  (COMM)

$500,000 COMM_Key

York Dover  Borough Ketterman  Park BRC-­‐PRD-­‐9-­‐63

$80,000 $115,000 9 Park  Rehabilitation  and  Development  (COMM)

$230,000 COMM_Key

York Dover  Borough Ketterman  Park  -­‐  Phase  II

BRC-­‐SC-­‐14-­‐80

$40,000 $40,000 14 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

York Dover  Township Lehr  Unity  Park BRC-­‐PRD-­‐7-­‐51

$105,357 $105,000 7 Park  Rehabilitation  and  Development  (COMM)

$210,715 COMM_Key

York East  Manchester  Township

Dauberton  Park BRC-­‐PRD-­‐9-­‐68

$84,700 $84,000 9 Park  Rehabilitation  and  Development  (COMM)

$169,400 COMM_Key

York East  Manchester  Township

Dauberton  Recreation  Area  Master  Plan

KEY-­‐TAG-­‐4-­‐49

$11,250 $11,200 4 Master  Site  Plans  (COMM)

$22,500 COMM_Key

York East  Prospect  Borough

Borough  Playground BRC-­‐SC-­‐7-­‐61

$20,000 $20,000 7 Small  Communities/Small  Projects  (COMM)

$27,900 COMM_Key

Page 556: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  556  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

York East  Prospect  Borough

East  Prospect  Park  -­‐  Development

BRC-­‐SC-­‐17-­‐32

$40,000 $40,000 17 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

York Fairview  Township Woodbridge  Park BRC-­‐PRD-­‐6-­‐62

$30,700 $24,000 6 Park  Rehabilitation  and  Development  (COMM)

$169,700 COMM_Key

York Farm  &  Natural  Lands  Trust  of  York  County  

Codorus  Creek  Watershed  Preservation  Plan

BRC-­‐RCI-­‐11.5-­‐1

$26,000 $25,000 11.5 Implementation  (RIV)

$51,000 RIVER_Key

York Farm  &  Natural  Lands  Trust  of  York  County  

Susquehanna  Heritage  Park

BRC-­‐LTA-­‐13.6-­‐610

$1,400,000 $1,400,000 13.6 Open  Space  Acquisition  (LT)

$2,900,000 LT_Key

York Farm  &  Natural  Lands  Trust  of  York  County  

Susquehanna  Riverlands

BRC-­‐LTA-­‐10-­‐7

$1,000,000 $2,000,000 10 Open  Space  Acquisition  (LT)

$13,411,400 LT_Key

York Farm  &  Natural  Lands  Trust  of  York  County  

Swann  Property BRC-­‐LTA-­‐7-­‐6

$110,125 $100,000 7 Open  Space  Acquisition  (LT)

$305,250 LT_Key

York Franklin  Township Ponderosa  Park  Playground

BRC-­‐SC-­‐11-­‐125

$40,000 $40,000 11 Small  Communities/Small  Projects  (COMM)

$62,600 COMM_Key

York Franklintown  Borough

Borough  Park KEY-­‐ACQ-­‐3-­‐71

$18,100 $13,000 3 Acquisition  (COMM)

$36,200 COMM_Key

Page 557: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  557  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

York Franklintown  Borough

Franklintown  Borough  Park

BRC-­‐SC-­‐6-­‐71

$20,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$39,600 COMM_Key

York Franklintown  Borough

Municipal  Park  Expansion

BRC-­‐ACQ-­‐9-­‐81

$64,800 $62,000 9 Acquisition  (COMM)

$188,800 COMM_Key

York Goldsboro  Borough Goldsboro  Borough  Park  Improvements

BRC-­‐SC-­‐10-­‐80

$25,000 $25,000 10 Small  Communities/Small  Projects  (COMM)

$30,000 COMM_Key

York Hallam  Borough Emig  Memorial  Park BRC-­‐PRD-­‐11-­‐40

$108,200 $100,000 11 Park  Rehabilitation  and  Development  (COMM)

$216,400 COMM_Key

York Heidelberg  Township

Township  Park  -­‐  Phase  II

BRC-­‐SC-­‐8-­‐233

$40,000 $40,000 8 Small  Communities/Small  Projects  (COMM)

$90,000 COMM_Key

York Hellam  Township Comprehensive  Rec.,  Park  and  Open  Space  Plan

BRC-­‐TAG-­‐17-­‐9

$29,738 $29,700 17 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$59,475 COMM_Key

York Hopewell  Township Stewartstown  Fairgrounds  Park

BRC-­‐PRD-­‐9-­‐96

$150,000 $140,000 9 Park  Rehabilitation  and  Development  (COMM)

$300,000 COMM_Key

Page 558: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  558  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

York Jackson  Township Township  Park-­‐  Phase  1-­‐  Development  (aka  Stone  Ledge  Park)

BRC-­‐PRD-­‐16-­‐139

$160,000 $160,000 16 Park  Rehabilitation  and  Development  (COMM)

$320,000 COMM_Key

York Jacobus  Borough Recreation  Area KEY-­‐SC-­‐1-­‐62 $20,000 $20,000 1 Small  Communities/Small  Projects  (COMM)

$33,058 COMM_Key

York Jacobus  Borough Recreation  Area KEY-­‐SC-­‐4-­‐71 $20,000 $20,000 4 Small  Communities/Small  Projects  (COMM)

$25,000 COMM_Key

York Jacobus  Borough Smith  Tract  Acquisition

BRC-­‐ACQ-­‐10-­‐186

$56,900 $49,000 10 Acquisition  (COMM)

$113,800 COMM_Key

York Jefferson  Borough Borough  Park BRC-­‐SC-­‐8-­‐93

$40,000 $40,000 8 Small  Communities/Small  Projects  (COMM)

$63,800 COMM_Key

York Logan  Park  Authority  Logan  Park BRC-­‐PRD-­‐13-­‐385

$32,000 $32,000 13 Park  Rehabilitation  and  Development  (COMM)

$64,000 COMM_Key

York Lower  Windsor  Township

Circuit  Rider BRC-­‐TAG-­‐9-­‐5

$96,076 $85,576 9 Circuit  Rider  (COMM)

$114,040 COMM_Key

York Lower  Windsor  Township

Peer-­‐To-­‐Peer  Project BRC-­‐TAG-­‐7-­‐109

$7,500 $7,500 7 Peer-­‐to-­‐Peer  Tech.  Assistance  (COMM)

$8,250 COMM_Key

Page 559: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  559  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

York Lower  Windsor  Township

Rexroth  Memorial  Park  -­‐  Phase  II

BRC-­‐PRD-­‐9-­‐123

$54,400 $54,000 9 Park  Rehabilitation  and  Development  (COMM)

$109,000 COMM_Key

York Lower  Windsor  Township

Rexroth  Park BRC-­‐PRD-­‐7-­‐110

$20,000 $20,000 7 Park  Rehabilitation  and  Development  (COMM)

$40,000 COMM_Key

York Manchester  Borough

Village  Green  Park BRC-­‐SC-­‐6-­‐104

$20,000 $20,000 6 Small  Communities/Small  Projects  (COMM)

$31,925 COMM_Key

York Manchester  Township

Cousler  Park  -­‐  Phase  I

BRC-­‐PRD-­‐10-­‐25

$115,000 $100,000 10 Park  Rehabilitation  and  Development  (COMM)

$230,000 COMM_Key

York Manchester  Township

Cousler  Park  Expansion

BRC-­‐ACQ-­‐9-­‐126

$120,000 $110,000 9 Acquisition  (COMM)

$240,000 COMM_Key

York Manheim  Township Community  Park  Acquisition

BRC-­‐ACQ-­‐8-­‐113

$59,300 $59,000 8 Acquisition  (COMM)

$118,500 COMM_Key

York Manheim  Township Manheim  Adventure  Park  -­‐  Phase  I

BRC-­‐PRD-­‐14-­‐152

$199,800 $200,000 14 Park  Rehabilitation  and  Development  (COMM)

$468,100 COMM_Key

York New  Freedom  Borough

Circuit  Rider KEY-­‐TAG-­‐1-­‐93

$25,000 $25,000 1 Circuit  Rider  (COMM)

$25,000 COMM_Key

Page 560: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  560  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

York New  Freedom  Borough

Circuit  Rider  (Year  2) KEY-­‐TAG-­‐2-­‐110

$19,840 $19,800 2 Circuit  Rider  (COMM)

$26,452 COMM_Key

York Newberry  Township Shelley  and  York  Haven  Parks

BRC-­‐PRD-­‐14-­‐158

$260,300 $150,000 14 Park  Rehabilitation  and  Development  (COMM)

$520,600 COMM_Key

York Newberry  Township Shelley  Park  Development  Project  Phase  I

BRC-­‐PRD-­‐10-­‐129

$43,435 $43,000 10 Park  Rehabilitation  and  Development  (COMM)

$86,870 COMM_Key

York Newberry  Township White  Oak  Park KEY-­‐PRD-­‐1-­‐94

$48,925 $48,900 1 Park  Rehabilitation  and  Development  (COMM)

$97,850 COMM_Key

York North  Codorus  Township

Community  Park KEY-­‐PRD-­‐3-­‐154

$45,700 $45,000 3 Park  Rehabilitation  and  Development  (COMM)

$91,400 COMM_Key

York North  York  Borough 5th  Avenue  Park BRC-­‐SC-­‐7-­‐142

$20,000 $20,000 7 Small  Communities/Small  Projects  (COMM)

$20,000 COMM_Key

York Paradise  Township Recreation  Park BRC-­‐ACQ-­‐8-­‐144

$46,800 $41,000 8 Acquisition  (COMM)

$93,700 COMM_Key

Page 561: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  561  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

York Paradise  Township Recreation  Park  (Farmer's  Field)  -­‐  Phase  II

BRC-­‐SC-­‐11-­‐144

$40,000 $40,000 11 Small  Communities/Small  Projects  (COMM)

$60,000 COMM_Key

York Railroad  Borough Borough  Park  Renovation

BRC-­‐SC-­‐12-­‐116

$40,000 $40,000 12 Small  Communities/Small  Projects  (COMM)

$75,300 COMM_Key

York Red  Lion  Borough Fairmount  Park  -­‐  Phase  1  -­‐  Development

BRC-­‐PRD-­‐17-­‐149

$200,000 $302,900 17 Park  Rehabilitation  and  Development  (COMM)

$400,000 COMM_Key

York Shrewsbury  Township

Southern  York  Recreation  Complex-­‐Phase  I

BRC-­‐PRD-­‐8-­‐174

$150,000 $130,000 8 Park  Rehabilitation  and  Development  (COMM)

$456,900 COMM_Key

York Shrewsbury  Township

Southern  York  Regional  Park

BRC-­‐ACQ-­‐7-­‐175

$90,101 $90,000 7 Acquisition  (COMM)

$186,202 COMM_Key

York Shrewsbury Township Winchester & Windy Hill Parks- Development

BRC-PRD-19-114

$120,000.00 $120,000.00 19 Park Rehabilitation and Development (COMM)

$240,000.00 COMM_Key

York Shrewsbury Township Winchester & Windy Hill Parks- Development

BRC-PRD-19-114

$120,000.00 $120,000.00 19 Park Rehabilitation and Development (COMM)

$240,000.00 COMM_Key

Page 562: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  562  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

York Shrewsbury Township Winchester & Windy Hill Parks- Development

BRC-PRD-19-114

$120,000.00 $120,000.00 19 Park Rehabilitation and Development (COMM)

$240,000.00 COMM_Key

York Shrewsbury  Township

Windy  Hill  Park KEY-­‐PRD-­‐3-­‐195

$54,700 $54,700 3 Park  Rehabilitation  and  Development  (COMM)

$109,400 COMM_Key

York Southern  Regional  Recreation  Board  

Circuit  Rider  -­‐  Year  3 KEY-­‐TAG-­‐3-­‐202

$13,800 $13,800 3 Circuit  Rider  (COMM)

$27,600 COMM_Key

York Spring  Grove  Borough

Circuit  Rider BRC-­‐TAG-­‐10-­‐17

$108,142 $108,142 10 Circuit  Rider  (COMM)

$130,090 COMM_Key

York Spring  Grove  Borough

Community  Center BRC-­‐PRD-­‐6-­‐172

$100,275 $100,000 6 Park  Rehabilitation  and  Development  (COMM)

$200,550 COMM_Key

York Spring  Grove  Borough

Community  Park BRC-­‐PRD-­‐13-­‐254

$70,300 $70,000 13 Park  Rehabilitation  and  Development  (COMM)

$140,600 COMM_Key

York Spring  Grove  Borough

Community  Park  -­‐  Phase  2  -­‐  Development

BRC-­‐PRD-­‐18-­‐101

$135,000 $135,000 18 Park  Rehabilitation  and  Development  (COMM)

$270,000 COMM_Key

Page 563: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  563  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

York Spring  Grove  Borough

Spring  Grove  Area  Community  Center

BRC-­‐PRD-­‐11-­‐84

$39,400 $39,000 11 Park  Rehabilitation  and  Development  (COMM)

$78,800 COMM_Key

York Springettsbury  Township

Comprehensive  Recreation,  Park  and  Greenway  Plan

BRC-­‐TAG-­‐11.5-­‐33

$30,000 $30,000 11.5 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$60,000 COMM_Key

York Springettsbury  Township

Penn  Oaks  Park  -­‐  Phase  1  Development

BRC-­‐PRD-­‐12-­‐203

$150,000 $150,000 12 Park  Rehabilitation  and  Development  (COMM)

$300,000 COMM_Key

York Springettsbury  Township

Pleasureville  Park,  North  Hills  Parcel  &  Augus  Schaefer  Park

BRC-­‐TAG-­‐13-­‐208

$46,000 $30,000 13 Master  Site  Plans  (COMM)

$92,700 COMM_Key

York Springfield  Township Hollow  Creek  Greenway

BRC-­‐PRD-­‐12-­‐287

$55,000 $55,000 12 Park  Rehabilitation  and  Development  (COMM)

$630,000 COMM_Key

York Springfield  Township Hollow  Creek  Greenway

BRC-­‐PRD-­‐12-­‐287

$55,000 $100,000 12 Park  Rehabilitation  and  Development  (COMM)

$630,000 COMM_Key

York Springfield  Township Lehman  Park  Master  Site  Plan

BRC-­‐TAG-­‐14-­‐244

$14,000 $14,000 14 Master  Site  Plans  (COMM)

$28,000 COMM_Key

Page 564: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  564  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

York The  Conservation  Fund  

Glatfelter  Parcel  Acquisition

BRC-­‐LTA-­‐17-­‐226

$425,000 $360,000 17 Critical  Habitat  Acquisition  (LT)

$825,000 LT_Key

York The  Conservation  Fund  

Pasch  Land  Acquisition  (Camp  Security)

BRC-­‐LTA-­‐17-­‐214

$500,000 $485,000 17 Open  Space  Acquisition  (LT)

$1,000,000 LT_Key

York The  Conservation  Fund  

Walters  Acquisition  (Camp  Security)

BRC-­‐LTA-­‐16-­‐237

$750,000 $1,060,000 16 Open  Space  Acquisition  (LT)

$2,600,000 LT_Key

York Trout  Unlimited  Codorus  Chapter  #558  

Codorus  Creek  Watershed  Plan

KEY-­‐RCP-­‐5-­‐8

$25,000 $25,000 5 Planning  (RIV) $50,000 RIVER_Key

York Trout  Unlimited  Muddy  Creek  Chapter  #575  

Muddy  Creek  Watershed  River  Conservation  Plan

BRC-­‐RCP-­‐11-­‐10

$72,100 $50,000 11 Planning  (RIV) $144,200 RIVER_Key

York Warrington  Township

Don-­‐El  Property BRC-­‐ACQ-­‐6-­‐190

$40,950 $37,000 6 Acquisition  (COMM)

$81,900 COMM_Key

York Warrington  Township

Warrington  Township  Park  Development

BRC-­‐PRD-­‐12-­‐215

$60,000 $60,000 12 Park  Rehabilitation  and  Development  (COMM)

$140,000 COMM_Key

York Wellsville  Borough Borough  Park KEY-­‐ACQ-­‐5-­‐219

$35,000 $35,000 5 Acquisition  (COMM)

$70,000 COMM_Key

York West  Manheim  Township

Recreation  Park BRC-­‐ACQ-­‐6-­‐197

$225,000 $200,000 6 Acquisition  (COMM)

$450,000 COMM_Key

York West  Manheim  Township

Recreation  Park  Master  Plan

BRC-­‐TAG-­‐9-­‐229

$25,000 $25,000 9 Master  Site  Plans  (COMM)

$50,000 COMM_Key

Page 565: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  565  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

York West Manheim Township

West Manheim Township Recreation Park- Development

BRC-PRD-19-125

$81,808.00 $82,000.00 19 Park Rehabilitation and Development (COMM)

$163,616.00 COMM_Key

York West Manheim Township

West Manheim Township Recreation Park- Development

BRC-PRD-19-125

$81,808.00 $82,000.00 19 Park Rehabilitation and Development (COMM)

$163,616.00 COMM_Key

York West Manheim Township

West Manheim Township Recreation Park- Development

BRC-PRD-19-125

$81,808.00 $82,000.00 19 Park Rehabilitation and Development (COMM)

$163,616.00 COMM_Key

York West  York  Borough Slagle  Park  Renovations  Project

BRC-­‐SC-­‐11-­‐165

$40,000 $40,000 11 Small  Communities/Small  Projects  (COMM)

$75,200 COMM_Key

York Windsor  Borough Borough  Park KEY-­‐SC-­‐2-­‐180

$20,000 $20,000 2 Small  Communities/Small  Projects  (COMM)

$22,400 COMM_Key

York Windsor  Borough Windsor  Borough  Park

BRC-­‐SC-­‐10-­‐104

$22,650 $22,000 10 Small  Communities/Small  Projects  (COMM)

$25,300 COMM_Key

York Windsor  Township Circuit  Rider BRC-­‐TAG-­‐10-­‐1

$80,185 $72,217 10 Circuit  Rider  (COMM)

$134,444 COMM_Key

York Windsor  Township Community  Center  Feasibility  Study

BRC-­‐TAG-­‐11-­‐241

$35,800 $35,800 11 Feasibility  Studies  (COMM)

$71,600 COMM_Key

Page 566: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  566  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

York Wrightsville  Borough Rec.  Open  Space  &  Greenway  Plan  &  Park  Feasibility  Study

BRC-­‐TAG-­‐15-­‐105

$26,732 $26,732 15 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$80,195 COMM_Key

York Yoe  Borough Borough  Park  Renovation

BRC-­‐PRD-­‐12-­‐218

$117,000 $70,000 12 Park  Rehabilitation  and  Development  (COMM)

$235,200 COMM_Key

York Yoe  Borough Recreation  Park KEY-­‐SC-­‐5-­‐230

$12,900 $12,900 5 Small  Communities/Small  Projects  (COMM)

$16,573 COMM_Key

York York  City Campus  Park KEY-­‐PRD-­‐1-­‐151

$33,813 $33,800 1 Park  Rehabilitation  and  Development  (COMM)

$67,626 COMM_Key

York York  City Comp.  Recreation,  Park  &  Open  Space  Plan

KEY-­‐TAG-­‐4-­‐178

$12,000 $12,000 4 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$32,000 COMM_Key

York York  City Farquhar  Park KEY-­‐PRD-­‐4-­‐179

$62,271 $62,300 4 Park  Rehabilitation  and  Development  (COMM)

$124,542 COMM_Key

Page 567: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  567  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

York York  City Memorial  and  Penn  Parks  -­‐  Development

BRC-­‐PRD-­‐16-­‐168

$200,000 $200,000 16 Park  Rehabilitation  and  Development  (COMM)

$400,000 COMM_Key

York York  City Memorial  Park  Rehabilitation

BRC-­‐PRD-­‐11-­‐103

$100,000 $100,000 11 Park  Rehabilitation  and  Development  (COMM)

$200,000 COMM_Key

York York  City Odeon  Park BRC-­‐PRD-­‐13-­‐454

$250,000 $200,000 13 Park  Rehabilitation  and  Development  (COMM)

$500,000 COMM_Key

York York  City Penn  Park BRC-­‐PRD-­‐6-­‐205

$42,881 $43,000 6 Park  Rehabilitation  and  Development  (COMM)

$85,761 COMM_Key

York York  City Penn  Park KEY-­‐PRD-­‐3-­‐245

$80,700 $80,700 3 Park  Rehabilitation  and  Development  (COMM)

$161,400 COMM_Key

York York  County Heritage  Rail  Trail  County  Park

BRC-­‐RTD-­‐6-­‐23

$200,000 $90,000 6 Rail  Rehabilitation  and  Development  (RT)

$1,000,000 RT_Key

Page 568: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  568  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

York York  County Natural  Areas  Inventory

KEY-­‐TAG-­‐1-­‐152

$30,320 $25,000 1 Natural  Areas  Inventories  (COMM)

$60,640 COMM_Key

York York  County Nixon  County  Park  Expansion

BRC-­‐ACQ-­‐7-­‐215

$45,000 $45,000 7 Acquisition  (COMM)

$90,000 COMM_Key

York York  County Richard  M.  Nixon  Park  Master  Site  Plan

BRC-­‐TAG-­‐18-­‐154

$23,000 $23,000 18 Master  Site  Plans  (COMM)

$46,000 COMM_Key

York York  County Rocky  Ridge  County  Park

BRC-­‐PRD-­‐10-­‐144

$145,000 $45,000 10 Park  Rehabilitation  and  Development  (COMM)

$290,000 RT_Key

York York  County Rocky  Ridge  County  Park

BRC-­‐PRD-­‐10-­‐144

$145,000 $100,000 10 Park  Rehabilitation  and  Development  (COMM)

$290,000 COMM_Key

York York  County Rocky  Ridge  Master  Plan/County  Greenway  Plan

BRC-­‐TAG-­‐6-­‐206

$20,000 $30,000 6 Master  Site  Plans  (COMM)

$60,000 COMM_Key

York York  County Rudy  Park KEY-­‐PRD-­‐5-­‐231

$150,000 $150,000 5 Park  Rehabilitation  and  Development  (COMM)

$307,500 COMM_Key

York York  County Susquehanna  Heritage  Park  Plan

BRC-­‐TAG-­‐16-­‐238

$50,000 $50,000 16 Master  Site  Plans  (COMM)

$100,000 COMM_Key

Page 569: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  569  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

York York  County York  County  Heritage  Rail-­‐Trail

KEY-­‐RTD-­‐3-­‐27

$150,000 $100,000 3 Rail  Rehabilitation  and  Development  (RT)

$200,000 RT_Key

York York  County York  County  Trail  Plan

BRC-­‐TAG-­‐13-­‐213

$40,000 $40,000 13 Trail  Study  (COMM)

$80,000 COMM_Key

York York  County  Conservation  District  

Codorus  Creek  Watershed  Conservation  Plan

BRC-­‐RCP-­‐8-­‐17

$25,000 $36,000 8 Planning  (RIV) $50,000 RIVER_Key

York York  County  Conservation  District  

Kreutz  Creek  Watershed  Plan

BRC-­‐RCP-­‐12-­‐18

$65,000 $40,000 12 Planning  (RIV) $130,000 RIVER_Key

York York  County  Conservation  District  

TreeVitalize  Metros BRC-­‐TV-­‐15-­‐31

$100,000 $100,000 15 Park  Rehabilitation  and  Development  (COMM)

$200,000 COMM_Key

York York  County  Rail  Trail  Authority  

CSX  Property  Acquisition  -­‐  (Northern  Extension  of  HRTCP)

BRC-­‐ACQ-­‐13.3-­‐287

$30,900 $70,000 13.3 Acquisition  (COMM)

$156,600 COMM_Key

York York  County  Rail  Trail  Authority  

Hanover  Trolley  Trail  Feasibility  Study  Phase  2

BRC-­‐RTP-­‐12-­‐15

$20,000 $20,000 12 Feasibility  Studies  (RT)

$40,000 RT_Key

York York  County  Rail  Trail  Authority  

Hanover  Trolley  Trail  Jackson  Township  Phase  2

BRC-­‐PRD-­‐16-­‐169

$127,500 $127,500 16 Park  Rehabilitation  and  Development  (COMM)

$255,000 COMM_Key

Page 570: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  570  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

York York  County  Rail  Trail  Authority  

North  Extension  Heritage  Rail  Trail  -­‐  Phase  2  Development

BRC-­‐PRD-­‐16-­‐219

$316,600 $295,600 16 Park  Rehabilitation  and  Development  (COMM)

$1,634,500 COMM_Key

York York  County  Rail  Trail  Authority  

Northern  Ext  of  Heritage  Rail  Trail  County  Park

BRC-­‐PRD-­‐11-­‐104

$115,000 $115,000 11 Park  Rehabilitation  and  Development  (COMM)

$230,000 COMM_Key

York York  County  Rail  Trail  Authority  

Northern  Ext.  of  HRTCP  Phase  2  Acquisitions

BRC-­‐RTA-­‐15-­‐107

$25,000 $25,000 15 Acquisition  (RT) $50,000 COMM_Key

York York  County  Rail  Trail  Authority  

Northern  Extension  of  HRTCP  -­‐  Phase  1A

BRC-­‐PRD-­‐13.3-­‐456

$100,100 $100,000 13.3 Park  Rehabilitation  and  Development  (COMM)

$200,200 COMM_Key

York York  County  Rail  Trail  Authority  

York  County  Heritage  Rail  Trail

KEY-­‐RTD-­‐4-­‐22

$160,300 $100,000 4 Rail  Rehabilitation  and  Development  (RT)

$320,600 RT_Key

York York County Rail Trail Authority

York County Heritage Rail Trail – Northern Ext Phase 3 – Development

BRC-RTD-19-154

$157,500.00 $157,500.00 19 Rail Rehabilitation and Development (RT)

$315,000.00 COMM_Key

Page 571: Keystone(Fund(Projects(by(County((199462013) · Keystone(Fund(Projects(by(County((199462013) Page%1%of%571 County Applicant(Name ProjectTitle Contract(Number Amount(Requested Amount(Awarded

Keystone  Fund  Projects  by  County  (1994-­‐2013)

Page  571  of  571

County Applicant  Name Project  TitleContract  Number

Amount  Requested

Amount  Awarded

GrantRound Funding  Type

Total  Project  Cost

Funding  Source

York York County Rail Trail Authority

York County Heritage Rail Trail – Northern Ext Phase 3 – Development

BRC-RTD-19-154

$157,500.00 $157,500.00 19 Rail Rehabilitation and Development (RT)

$315,000.00 COMM_Key

York York County Rail Trail Authority

York County Heritage Rail Trail – Northern Ext Phase 3 – Development

BRC-RTD-19-154

$157,500.00 $157,500.00 19 Rail Rehabilitation and Development (RT)

$315,000.00 COMM_Key

York York  Township Comp.  Recreation,  Park  Open  Space  &  Greenway  Plan

BRC-­‐TAG-­‐6-­‐207

$20,000 $20,000 6 Comp.  Rec.,  Park,  &  Open  Space  Plans  (COMM)

$40,000 COMM_Key

York York  Township MA  &  PA  Community  Greenway  Feasibility  Study

BRC-­‐TAG-­‐13.3-­‐500

$42,300 $40,000 13.3 Feasibility  Studies  (COMM)

$84,600 COMM_Key

York York  Township Stump  Park BRC-­‐PRD-­‐12-­‐220

$236,600 $200,000 12 Park  Rehabilitation  and  Development  (COMM)

$473,300 COMM_Key

York York  Township Township  Park-­‐Phase  III

KEY-­‐PRD-­‐2-­‐182

$46,500 $46,500 2 Park  Rehabilitation  and  Development  (COMM)

$93,000 COMM_Key