Page 1: KHASAB Cluster Optimization Report March 2014

Huawei Technologies Co., Ltd.

Huawei Technologies

www.huawei.com

•KHASAB-CLUSTER K-01•OPTIMIZATION REPORT

March-2014

Page 2: KHASAB Cluster Optimization Report March 2014

Huawei Technologies Co., Ltd.

Huawei Technologies

Page 2

DT Test tools : 2 UEs, GENEX Probe V3.5

Post Processing Tool : GENEX Assistant 3.5 SPC 300

Service mode : AMR Voice call

UE Network : UE1 – AMR Continuous Call (3G Locked)

: UE2 – AMR Continuous Call (Auto Mode)

Drive Test Engr. : Kuldeep Sharma

RF Engineer : Ali Raza

Drive Test Date : 10-March – 18-March-2014

Drive Test Time : 02:00 – 05:00 & 02:25 – 05:30(OFF PEAK ), 16:50 - 20:30 ( PEAK )

DRIVE TEST INFORMATION

Page 3: KHASAB Cluster Optimization Report March 2014

Huawei Technologies Co., Ltd.

Huawei TechnologiesDRIVE TEST KPI SUMMARY

RSCP

PRE OFF PEAK POST OFF PEAK POST PEAK

> -90 dBm (%) > -90 dBm (%) > -90 dBm (%)

97.25 % 97.17 % 96.47%

Ec/Io> -12 dB (%) > -12 dB (%) > -12 dB (%)

98.79% 97.63% 90.86%

UE Tx Power< 0 (%) < 0 (%) < 0 (%)

99.62% 99.38% 98.95%

BLER< 1 (%) < 1 (%) < 1 (%)

90.28% 89.04% 84.75%

3G LOCK AUTO MODE

CS Call Setup Status Pre OFF PEAK POST OFF PEAK POST PEAK CS Call Setup Status Pre OFF PEAK POST OFF PEAK POST PEAK

Status Count Count Count Status Count Count Count

Call Setup Success 6 7 7 Call Setup Success 9 14 22

Call Summary Call Summary

ITEM Count Count Count ITEM Count Count Count

Call Dropped 0 0 0 Call Dropped 0 0 0

Completed Call Number 6 7 7 Completed Call Number 9 14 22

Total Call Number 6 7 7 Total Call Number 9 14 22

Page 4: KHASAB Cluster Optimization Report March 2014

Huawei Technologies Co., Ltd.

Huawei Technologies

Page 4

KHASAB CLUSTER DRIVE ROUTE

Area Name – KHASABNumber of Sites – 11Number of Cells – 68

Page 5: KHASAB Cluster Optimization Report March 2014

Huawei Technologies Co., Ltd.

Huawei Technologies

Page 5

UE RSCP PLOT - PRE OFF PEAKPRE OFF PEAK

Overall RSCP is good. Some encircled area having poor RSCP.

The Reasons for the Poor RSCP is due to no dominancy in area.

Some area are far from the servings sites. DT was done during off peak hours.

Overall 97.25% samples are better than -90dBm.

1

2

3

6

4

5

Page 6: KHASAB Cluster Optimization Report March 2014

Huawei Technologies Co., Ltd.

Huawei Technologies

Page 6

UE Ec/Io PLOT - PRE OFF PEAK

Overall Ec/Io is good. Some encircled area having poor Ec/Io.

The Reasons for the Poor Ec/Io is due to no dominancy in area.

Some area are far from the servings sites. DT was done during off peak hours.

PRE OFF PEAK

Page 7: KHASAB Cluster Optimization Report March 2014

Huawei Technologies Co., Ltd.

Huawei Technologies

Page 7

UE Tx POWER OVERVIEW - PRE OFF PEAK

Over all UE Tx power is good.

Some of the Encircled areas having poor Tx power due to poor coverage.

Drive test is done during Off Peak.

PRE OFF PEAK

Page 8: KHASAB Cluster Optimization Report March 2014

Huawei Technologies Co., Ltd.

Huawei Technologies

Page 8

BLER OVERVIEW - PRE OFF PEAK

Overall BLER is good.

Drive test is done during Off Peak.

PRE OFF PEAK

Page 9: KHASAB Cluster Optimization Report March 2014

Huawei Technologies Co., Ltd.

Huawei Technologies

Page 9

UE RSCP PLOT - POST OFF PEAKPOST OFF PEAK

Overall RSCP is very good. Red encircles shows the areas after the adjustments and week coverage

The Reasons for the Poor RSCP is due to no dominancy in area, current sites can’t cover that area due to distance and vegetation loss.

DT was done during off peak hours.

Page 10: KHASAB Cluster Optimization Report March 2014

Huawei Technologies Co., Ltd.

Huawei TechnologiesPOST OFF PEAK

Page 10

UE Ec/Io PLOT - POST OFF PEAK

Overall Ec/Io is slightly degraded due to traffic.

The reasons for the poor Ec/Io in few location is due to no dominant cell in the area.

DT was done during off peak hours.

Page 11: KHASAB Cluster Optimization Report March 2014

Huawei Technologies Co., Ltd.

Huawei Technologies

Page 11

UE Tx POWER OVERVIEW - POST OFF PEAK

Over all UE Tx power is good.

Red Some of the Encircled areas having poor Tx power due to poor coverage.

Drive test is done during Off Peak.

POST OFF PEAK

Page 12: KHASAB Cluster Optimization Report March 2014

Huawei Technologies Co., Ltd.

Huawei Technologies

Page 12

BLER OVERVIEW - POST OFF PEAK

Overall BLER is very good.

Drive test is done during Off Peak.

POST OFF PEAK

Page 13: KHASAB Cluster Optimization Report March 2014

www.huawei.com

CLUSTER OPTIMIZATION OFF PEAK AND PEAK DRIVETEST COMPARISON

Page 14: KHASAB Cluster Optimization Report March 2014

Huawei Technologies Co., Ltd.

Huawei Technologies

Page 14

RSCP UE COVERAGE COMPARISON

- Overall RSCP is almost the same during Peak and Off-Peak Drive test.

POST OFF PEAK PEAK

Page 15: KHASAB Cluster Optimization Report March 2014

Huawei Technologies Co., Ltd.

Huawei Technologies

Page 15

Ec/Io UE COVERAGE COMPARISON PEAK

- Peak Ec/Io is degraded in comparison with off-peak because of high traffic.

POST OFF PEAK

Page 16: KHASAB Cluster Optimization Report March 2014

Huawei Technologies Co., Ltd.

Huawei Technologies

Page 16

UE Tx POWER COMPARISONPEAK

- Overall Tx Power is almost the same during Peak and Off-Peak Drive test.

POST OFF PEAK

Page 17: KHASAB Cluster Optimization Report March 2014

Huawei Technologies Co., Ltd.

Huawei Technologies

Page 17

BLER UE COMPARISON

- Overall Bler is almost the same during Peak and Off-Peak Drive test.

PEAKPOST OFF PEAK

Page 18: KHASAB Cluster Optimization Report March 2014

www.huawei.com

IMPROVED AREAS IN CLUSTER OPTIMIZATION

Page 19: KHASAB Cluster Optimization Report March 2014

Huawei Technologies Co., Ltd.

Huawei Technologies

Page 19

IMPROVED AREAS IN CLUSTER OPTIMIZATION - Ec/Io PLOT

• In Previous & current Plots ( Before & After Optimization) in

RED highlighted circles , we can see the clear improvement.

• Overall areas are improved after physical optimization.

• Many cells were carrying low traffic & some were

overshooting. Adjustment is done accordingly.

PREVIOUS

CURRENT

CURRENT

PREVIOUS

PREVIOUS CURRENT

Page 20: KHASAB Cluster Optimization Report March 2014

Huawei Technologies Co., Ltd.

Huawei Technologies

Page 20

IMPROVED AREAS IN CLUSTER OPTIMIZATION - Ec/Io PLOT

PREVIOUS CURRENT

• In Previous & current Plots ( Before & After Optimization) in RED highlighted circles , we can see the clear improvement.

• Overall areas are improved after physical optimization.

• Many cells were carrying low traffic & some were overshooting. Adjustment is done accordingly.

Page 21: KHASAB Cluster Optimization Report March 2014

www.huawei.com

FURTHER IMPROMENT RECOMMANDATION

Page 22: KHASAB Cluster Optimization Report March 2014

Huawei Technologies Co., Ltd.

Huawei Technologies

Page 22

Coverage Detailed Analysis – SPOT 1

PROBLEM DESCRIPTION : Poor RSCP, this area can’t be improved with the existing sites due to distance and vegetation loss.1. By estimate from the DT data, LuLu super market indoor coverage will be bad,

even 2G also have IBS plan in this super market. hence, IBS solution is needed.2. With the implementation of IBS need to add two additional outdoor sectors

which will help to improve outdoor coverage.

RECOMMENDATION: Need to add IBS for the LuLu hyper market in Khasab with two outdoor sectors serving the populated area. 2- Need to deploy U900 uniformly in all the sites of Khasab area.

PROPOSED NEW SITE

CATEGORY SITE NAME LONGITUDE LATITIUDE AZIMUTH ANTENNA HEIGHT REASON

Outdoor Lulu Hypermarket 56.251908 26.199544 130,215 25m FOR COVERAGE ENHANCEMENT AND CAPACITY

Indoor Lulu Hypermarket 56.251908 26.199544 130,215 25m FOR COVERAGE ENHANCEMENT AND CAPACITY

RSCP Ec/Io

PROPOSED NEW SITE

Peak Ec/Io

Page 23: KHASAB Cluster Optimization Report March 2014

Huawei Technologies Co., Ltd.

Huawei Technologies

Page 23

Coverage Analysis – SPOT 2 & 3

Problem Description: Above highlighted area has a poor coverage issue, after adjustment quality has been improved in the target area. Coverage is still bad in this area. Activity Performed: Adjustment done on KHASABBANK_3G to cover the problematic area. Ec/Io Has been improved.Suggestion: Need to deploy U900 uniformly in all the sites of Khasab area.

RSCP Before Ec/Io Before

RSCP AfterEc/Io After

2

3

2

3

Page 24: KHASAB Cluster Optimization Report March 2014

Huawei Technologies Co., Ltd.

Huawei Technologies

Page 24

Coverage Analysis – SPOT 4

Problem Description: Above highlighted area has a poor coverage issue, after adjustment little improvement has been noticed in coverage and quality . Activity Performed: Adjustment done on AL_Sharja_3G to cover the problematic area.

Suggestion: Need to deploy U900 uniformly in all the sites of Khasab area.

RSCP Before Ec/Io Before

RSCP After

Ec/Io After

4

4

Page 25: KHASAB Cluster Optimization Report March 2014

Huawei Technologies Co., Ltd.

Huawei Technologies

Page 25

Coverage Analysis – SPOT 5

Problem Description: Above highlighted area has a poor coverage issue, After adjustment coverage has been improved but quality is still not good. Activity Performed: Adjustment done on KHASABOMANTEL_3G to cover the problematic area. Quality is still poor.

Suggestion: Need to deploy U900 uniformly in all the sites of Khasab area.

RSCP BeforeEc/Io Before

RSCP AfterEc/Io After

5

5

Page 26: KHASAB Cluster Optimization Report March 2014

Huawei Technologies Co., Ltd.

Huawei Technologies

Page 26

Coverage Analysis – SPOT 6

Problem Description: Above highlighted area has a poor coverage issue, After adjustment coverage has been improved but quality is still not good. Activity Performed: Adjustment done on KHASABOMANTEL_3G to cover the problematic area. Quality is still poor.

Suggestion: Need to deploy U900 uniformly in all the sites of Khasab area.

RSCP Before Ec/Io Before

RSCP AfterEc/Io After

6

6

Page 27: KHASAB Cluster Optimization Report March 2014

Huawei Technologies Co., Ltd.

Huawei Technologies

Page 27

Coverage Analysis

PROBLEM DESCRIPTION : Poor RSCP in the in highlighted area is due to pilot is serving in this area.Nearest site is KHASABEARTHSTATION_3G which is having two sectors only and covering the main road and area near to road. It is looking a large area need to be covered as shown from google earth view. As this area is opposite to the site physical adjustment cannot solve the coverage issue.RECOMMENDATION: No sector is shooting towards this area. Need to add additional sector to KHASABEARTHSTATION_3G area can be easily improved

PROPOSED IBS & ADDITIONAL SECTOR

Golden Tulip – Khasab (Google Image)

PROPOSED IBS & ADDITIONAL SECTOR

PROPOSED IBS & ADDITIONAL SECTORCategory Site Name Cell Name Latitude Longitude Azimuth Antenna height M-Tilt Reason Solution

Additional Sector KHASABEARTHSTATION_3G

KHASABEARTHSTATION_3G_C 26.15749 56.23313 260 20m 2

FOR COVERAGE ENHANCEMENT AND CAPACITY

Permanent

Page 28: KHASAB Cluster Optimization Report March 2014

Huawei Technologies Co., Ltd.

Huawei Technologies

Page 28

SUMMARY

Cluster K-01 New Sites Proposal Summary

CATEGORY No. Of Sites

Sector addition 1

New Site - IBS 1

NEW SITE-3G(LuLu Hyper market Along with IBS) 1

Coverage is found to be normal at cluster level. There are few areas with no dominance or weak coverage, where new sites are already been

planned to improve the 3G coverage & quality.

Below recommendation in the table need to be implemented so that coverage , capacity and user perception can be improved.

Some complaints in Khasab area are mainly due to penetration losses. Needs to deploy U900(as 3rd Carrier) so that indoor penetration will be improved

Needs to implement the recommended sites as soon as possible to enhance coverage & quality in the area which will ultimately lead to improve

overall RNC KPIs.

Needs to deploy U900 uniformly to cater the growing CS & PS services.

Category Site Name Cell Name Latitude Longitude Azimuth Antenna height M-Tilt Reason Solution

New Site - IBS Lulu Hypermarket Lulu Hypermarket_A 26.199544 56.251908 0 0 N/A FOR COVERAGE ENHANCEMENT Permanent

New Site - Outdoor Lulu Hypermarket Lulu Hypermarket_B 26.199544 56.251908 130 25m 2 FOR COVERAGE ENHANCEMENT AND

CAPACITY Permanent

New Site - Outdoor Lulu Hypermarket Lulu Hypermarket_C 26.199544 56.251908 215 25m 2 FOR COVERAGE ENHANCEMENT AND

CAPACITY Permanent

Additional Sector KHASABEARTHSTATION_3G KHASABEARTHSTATION_3G_C 26.157486 56.233128 260 20m 2 FOR COVERAGE ENHANCEMENT AND

CAPACITY Permanent

Page 29: KHASAB Cluster Optimization Report March 2014

Huawei Technologies Co., Ltd.

Huawei Technologies

Thank youwww.huawei.com